UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-Q (Mark One) ☒ QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the quarterly period ended June 30, 2026 OR ☐ TRANSITION REPORT…
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
(Mark One)
☒
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended June 30, 2026
OR
☐
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from to
Commission file number 001-40398
HIVE DIGITAL TECHNOLOGIES LTD.
(Exact name of registrant as specified in its charter)
British Columbia
(State or other jurisdiction of
incorporation or organization)
98-1831411
(I.R.S. Employer Identification No.)
Suite 128, 7900 Callaghan Road
San Antonio, Texas
(Address of principal executive offices)
78229
(Zip Code)
604-664-1078
(Registrant's telephone number, including area code)
Securities registered pursuant to Section 12(b) of the Act:
Title of each class
Common Stock, no par value
Trading Symbol(s)
HIVE
Name of each exchange on which registered
The Nasdaq Stock Market LLC
Indicate by check mark whether the registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities
Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports);
and (2) has been subject to such filing requirements for the past 90 days.
Yes ☒ No ☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted
pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the
registrant was required to submit such files).
Yes ☒ No ☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting
company, or an emerging growth company. See the definitions of "large accelerated filer," "accelerated filer," "smaller reporting
company," and "emerging growth company" in Rule 12b-2 of the Exchange Act.
Large accelerated filer
Non-accelerated filer
☒
☐
☐
☐
☐
Accelerated filer
Smaller reporting company
Emerging growth company
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for
complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act).
As of August 14, 2026, the registrant had 274,277,338 shares of its common stock outstanding.
Yes ☐ No ☒
TABLE OF CONTENTS
Item 1.
Item 2.
Item 3.
Item 4.
PART I-FINANCIAL INFORMATION
Financial Statements (Unaudited)
Management's Discussion and Analysis of Financial Condition and Results of Operations
Quantitative and Qualitative Disclosures about Market Risk
Controls and Procedures
Item 1.
Item 1A.
Item 2.
Item 3.
Item 4.
Item 5.
Item 6.
PART II-OTHER INFORMATION
Legal Proceedings
Risk Factors
Unregistered Sales of Equity Securities and Use of Proceeds
Defaults Upon Senior Securities
Mine Safety Disclosures
Other Information
Exhibits
2
Page
6
6
31
32
33
33
33
33
33
33
34
GENERAL MATTERS
As used in this Quarterly Report on Form 10-Q for the quarterly period ended June 30, 2026 (this "Quarterly Report"), the terms "we,"
"us," "our," the "Company," the "Registrant," and "HIVE," refer to HIVE Digital Technologies Ltd., a British Columbia corporation,
and its consolidated subsidiaries, unless otherwise indicated.
Cautionary Statement Regarding Forward-Looking Statements
This Quarterly Report on Form 10-Q (this "Quarterly Report") contains forward-looking statements within the meaning of the Private
Securities Litigation Reform Act of 1995 that involve risks and uncertainties, as well as assumptions, that, if proven incorrect or do not
materialize, could cause our results to differ materially from those expressed or implied by these forward-looking statements. Forwardlooking statements generally are identified by the words "intend," "plan," "may," "should," "will," "project," "estimate," "anticipate,"
"believe," "expect," "continue," "potential," "opportunity," and similar expressions. All statements other than statements of historical
fact are statements that could be deemed forward-looking statements. Such statements are based on management's current expectations
and are subject to a number of factors and uncertainties that could cause actual results to differ materially from those described in the
forward-looking statements. There can be no assurance that actual results or business conditions will not differ materially from those
projected or suggested in such forward-looking statements as a result of various factors, including those described in Part I, Item 1A,
"Risk Factors" in the Annual Report on Form 10-K for the fiscal year ended March 31, 2026 (the "Annual Report") and in Part II, Item
1.A, "Risk Factors" of this Quarterly Report. Except as required by law, we do not assume any obligation to update or revise these
forward-looking statements for any reason, even if new information becomes available in the future.
GLOSSARY
The following are abbreviations and definitions of certain terms used in this Quarterly Report, some of which are commonly used in the
data center, digital infrastructure, and cryptocurrency mining industries:
AI:
ANDE:
ASIC:
Bitcoin or BTC:
Bitcoin Network:
Bitmain:
Blockchain:
Boden Tech:
Artificial intelligence.
Refers to the Administración Nacional de Electricidad ("ANDE"), Paraguay's state-owned utility
responsible for the generation, transmission, and distribution of electricity nationwide.
ASIC is an acronym for application-specific integrated circuit, a microchip designed for a special
application, such as a particular kind of transmission protocol or a hand-held computer. In the context
of digital currency mining, ASICs have been designed to solve specific hashing algorithms efficiently,
including for Bitcoin mining.
Bitcoin refers to the native token of the Bitcoin Network which utilizes the SHA-256 algorithm.
Bitcoin is a peer-to-peer payment system and the digital currency of the same name which uses opensource cryptography to control the creation and transfer of such digital currency.
The network of computers running the software protocol underlying Bitcoin and which network
maintains the database of Bitcoin ownership and facilitates the transfer of Bitcoin among parties.
Bitmain Technologies Ltd., a leading supplier of ASIC hardware (under the brand name Antminer)
which designs and manufacturers high-performance computing chips and software.
An immutable, decentralized transaction ledger which records transactions, such as financial
transactions in cryptocurrency, in chronological order. Bitcoin and Ethereum are examples of wellknown and widely distributed blockchains.
Boden Technologies AB.
3
CAD$ or C$:
EH/s:
FPPS:
GPU:
Hash:
HPC:
Hashprice:
Hashrate:
HIVE Paraguay
Valenzuela Facility:
HIVE Paraguay Yguazú
Facility:
HIVE Toronto Facility:
J/TH:
Mining:
MW:
NASDAQ:
Network Difficulty:
Canadian Dollar.
Exahashes per second. A unit of measurement equal to one quintillion (10¹⁸) hashes per second, used
to measure the computational power (hashrate) applied to Bitcoin Mining.
FPPS, also referred to as Full Pay-Per-Share is a Bitcoin mining reward model where miners receive a
fixed payout for each share submitted, covering both block rewards and transaction fees. The mining
pool assumes the risk of block variability and pays miners regardless of actual block discovery,
offering predictable earnings.
GPU refers to a graphics processing unit; a programmable logic chip (processor) specialized for
display functions and effective at solving digital currency hashing algorithms.
Means the output of a hash function, i.e. the output of the fundamental mathematical computation of a
particular cryptocurrency's computer code which miners execute, and "Gigahash" and "Petahash"
mean, respectively, 1x109 Hashes and 1x1015 Hashes.
High-performance computing
Hashprice refers to the daily revenue Bitcoin miners can expect to earn per unit of computational
power and is typically measured in dollars per TeraHash per second per day ($/TH/s/day).
Hashrate is a measure of mining power whereby the expected income from mining is directly
proportional to a miners hashrate normalized by the total hashrate of the network.
The Company's facility located in Valenzuela, Paraguay.
The Company's facility located in Yguazú, Paraguay.
The Company's facility located on Toronto, Ontario Canada acquired by HIVE in September 2025.
Joules per terahash (a common industry measure of electrical efficiency in an ASIC).
Mining refers to the provision of computing capacity to secure a distributed network by creating,
verifying, publishing and propagating blocks in the blockchain in exchange for rewards and fees
denominated in the native token of that network (i.e. Bitcoin or Ethereum, as applicable).
Megawatts.
Nasdaq's Capital Markets Exchange.
Refers to the measure of how difficult it is to find a Hash below a given target.
4
PH/s:
SEK:
SHA -256:
Tier-I Data Facility or
Tier-I Data Center:
Tier-III Data Facility:
U.S. GAAP:
Petahash per second.
Swedish Krona.
SHA-256 is a cryptographic Hash algorithm. SHA-256 generates an almost-unique 256-bit (32-byte)
signature for a text. The most well-known cryptocurrencies that utilize the SHA-256 algorithm are
Bitcoin and Bitcoin cash.
A Tier-I data facility has a single path for power and cooling, and few, if any, redundant and backup
components. It has an expected uptime of 99.671% (28.8 hours of downtime annually).
A Tier-III data facility is a concurrently maintainable facility with multiple active power and cooling
paths, allowing for planned maintenance without downtime. Such facilities feature "N+1 redundancy,"
meaning they maintain backup components to handle failures or maintenance, and guarantee uptime of
99.982% (1.6 hours of downtime annually).
U.S. Generally Accepted Accounting Principles.
5
PART I-FINANCIAL INFORMATION
ITEM 1. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
INDEX TO THE UNAUDITED CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
Page
Condensed Interim Consolidated Statements of Financial Position
1
Condensed Interim Consolidated Statements of Income and Comprehensive Income
2
Condensed Interim Consolidated Statements of Changes in Equity
3
Condensed Interim Consolidated Statements of Cash Flows
4
Notes to the Condensed Interim Consolidated Financial Statements
5 - 35
HIVE Digital Technologies Ltd.
Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(In thousands of U.S. dollars)
(Unaudited)
HIVE Digital Technologies Ltd.
Contents
Page
Condensed Interim Consolidated Statements of Financial Position
1
Condensed Interim Consolidated Statements of Income (Loss) and Comprehensive Income (Loss)
2
Condensed Interim Consolidated Statements of Changes in Equity
3
Consolidated Statements of Cash Flows
4
Notes to the Condensed Interim Consolidated Financial Statements
5 - 35
HIVE Digital Technologies Ltd.
Condensed Interim Consolidated Balance Sheets
(expressed in thousands of United States dollars)
(Unaudited)
As at
Note
Assets
Current assets
Cash and cash equivalents
Amounts receivable and prepaids, net
Derivative asset
Investments
Digital currencies
Total current assets
June 30, 2026
$
5
10
4
6
Property, plant and equipment, net
Long term receivables, net
Deposits, net
Right of use assets
Total assets
7
5
8
15
$
Liabilities
Current liabilities
Accounts payable and accrued liabilities
Current portion of lease liability
Current portion of loans payable
Term loan
Current portion of mortgage payable
Warrant liability
Current income tax liability
Total current liabilities
9, 16
15
12
13
14
11, 25
19
Convertible loan - liability component
Loans payable
Lease liability
Mortgage payable
Deferred tax liability
Total liabilities
Equity
Share capital
Additional paid in capital
Accumulated other comprehensive income
Accumulated deficit
Total equity
Total liabilities and equity
$
208,039
18,887
30,994
10,858
11,248
280,026
453,154
2,051
82,998
106,411
924,640
118,403
12,216
1,460
1,600
162
2,154
7,059
143,054
March 31, 2026
$
$
$
23,113
15,566
606
9,741
10,822
59,848
480,476
2,147
53,579
43,096
639,146
27,045
12,368
1,460
2,038
143
413
10,968
54,435
10
12
15
14
234,872
9,457
96,237
18,300
21
501,941
9,497
31,212
14,348
295
109,787
18
981,154
6,762
(565,217)
422,699
944,048
7,621
(422,310)
529,359
$
924,640
$
639,146
On behalf of the board:
"Frank Holmes"
Director
"Marcus New"
Director
The accompanying notes are an integral part of these condensed interim consolidated financial statements.
1
HIVE Digital Technologies Ltd.
Condensed Interim Consolidated Statements of
(Loss) Income and Comprehensive (Loss) Income
(expressed in thousands of United States dollars except per share amounts)
(Unaudited)
For the
Three months ended
June 30, 2026
June 30, 2025
Note
Revenue from digital currency mining
High performance computing
Cost of sales
Operating and maintenance costs
High performance computing service fees
Depreciation
$
23
Net realized and unrealized (loss) gain on digital currencies
Operating expenses
Selling, general, administrative expenses
Foreign exchange (loss) gain
Stock-based compensation
Total operating expenses
Unrealized gain on investments
Change in fair value of derivatives
Non-cash provision for regulatory liabilities
Recovery of sales tax receivables
(Loss) gain on sale of equipment
Other income
Finance expense
(Loss) income from operations
22
19
25
16
5
21
Tax expense
Net (loss) income after tax
Other comprehensive income (loss)
Translation adjustment
72,060
7,060
79,120
$
40,797
4,814
45,611
(53,877)
(1,055)
(53,678)
(29,490)
(28,983)
(809)
(22,011)
(6,192)
(809)
23,161
(9,021)
(2,874)
(7,082)
(18,977)
(5,750)
2,872
(5,750)
(8,628)
1,277
(7,062)
(84,650)
(960)
675
(1,336)
(141,332)
8,172
16,436
1,367
1,312
325
(288)
35,665
(1,575)
(142,907)
(649)
35,016
(859)
1,856
Net (loss) income and comprehensive (loss) income
$
(143,766) $
36,872
Basic (loss) income per share
Diluted (loss) income per share
$
$
(0.54) $
(0.54) $
0.19
0.18
Weighted average number of common shares outstanding
Basic
Diluted
20
20
266,251,300
266,251,300
182,007,767
192,827,179
The accompanying notes are an integral part of these condensed interim consolidated financial statements.
2
HIVE Digital Technologies Ltd.
Condensed Interim Consolidated Statements of Changes in Equity
(expressed in thousands of United States dollars except share amounts)
(Unaudited)
Common
Note shares issued
Equity
Balance,
March 31,
2025
Share-based
compensation
Shares
offering
Issuance
costs
Exercise of
options
Net income
Translation
adjustment
Balance,
June 30,
2025
Balance,
March 31,
2026
Share-based
compensation
Shares
offering
Vesting of
restricted
stock units
Issuance
costs
Net loss
Translation
adjustment
Balance,
June 30,
2026
165,615,186 $
19
19
Amount
Additional paidin capital
Accumulated other
comprehensive income
Accumulated
deficit
(273,862) $
Total equity
716,708 $
6,291 $
449,137
5,750
5,750
38,109,822
68,169
68,169
(145)
(145)
600,000
738
35,016
738
35,016
1,856
1,856
204,325,008 $
791,220 $
8,147 $
(238,846) $
560,521
259,348,106 $
944,048 $
7,621 $
(422,310) $
529,359
7,082
7,082
9,855,902
30,180
30,180
1,797,375
(156)
(142,907)
(156)
(142,907)
(859)
(859)
271,001,383 $
981,154 $
6,762 $
(565,217) $
422,699
The accompanying notes are an integral part of these condensed interim consolidated financial statements.
3
HIVE Digital Technologies Ltd.
Condensed Interim Consolidated Statements of
Cash Flows
(expressed in thousands of United States dollars)
(Unaudited)
Three months ended
June 30, 2026
June 30, 2025
As at
Cash flows from operating activities
Net (loss) income for the period
Adjustments to reconcile net (loss) income to net cash provided by (used in) operating
activities
Revenue recognized from digital currency mined
Proceeds from sale of digital currency
Revaluation of digital currency
Depreciation
Non-cash lease expense
Unrealized gain on investments
Change in fair value of derivatives
Non-cash provision for regulatory liabilities
Recovery of sales tax receivables
Loss (gain) on sale of mining assets
Income tax expense
Accretion on convertible debt
Share-based compensation
Interest expense
Unrealized foreign exchange
Lease payments on operating leases
$
(142,907) $
35,016
(72,060)
65,803
809
53,678
4,966
(1,277)
7,062
84,650
960
1,575
211
7,082
438
(540)
(4,120)
(40,797)
66,447
(23,161)
22,011
2,484
(8,172)
(16,436)
(1,367)
(1,312)
649
138
5,750
72
(2,832)
(867)
Changes in non-working capital items
Amounts receivable and prepaids
Accounts payable and accrued liabilities
Net cash provided by operating activities
(3,225)
952
4,057
(17,941)
(9,454)
10,228
Cash flows from investing activities
Deposits on equipment
Purchases of investments
Proceeds on disposal of equipment
Purchase of equipment
Purchase of property
Payment of security deposits
Net cash used in investing activities
(27,527)
1,574
(3,456)
(14,745)
(3,964)
(48,118)
(15,978)
(126)
1,475
(31,379)
(15,948)
(61,956)
Cash flows from financing activities
Proceeds from exercise of options
Term loan payments
Shares offering
Repayment of loans
Repayment of acquisition loan payable
Issuance of debentures
Net cash provided by financing activities
(411)
30,026
(216)
199,163
228,562
738
(410)
68,024
(15,500)
52,852
425
102
Effects of exchange rate changes on cash
Net change in cash during the period
Cash and cash equivalents
$
184,926
$
1,226
Beginning of the period
End of the period
$
23,113
208,039
$
23,375
24,601
The accompanying notes are an integral part of these condensed interim consolidated financial statements.
4
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
1.
Nature of Operations
HIVE Digital Technologies Ltd. (the "Company") is in the business of providing infrastructure solutions, including operating Tier-1
and Tier-3 data centers, the computing power of which is used for high performance computing ("HPC") and generating hashrate which
is sold to mining pools that use the hashpower for "the mining of cryptocurrencies". The Company's operations fund the Company's
ongoing investing and expansion activities. Digital currencies are subject to risks unique to the asset class and different from traditional
assets. Additionally, the Company may at times hold assets with third party custodians or exchanges that are limited in oversight by
regulatory authorities.
The Company was incorporated in the province of British Columbia and is a reporting issuer in each of the Provinces and Territories of
Canada. The Company is listed for trading on the Nasdaq's Capital Markets Exchange under "HIVE", and on the Colombian Stock
Exchange under "HIVECO". Effective May 12, 2026, the Company completed its efforts to list on the Toronto Stock Exchange
("TSX") under the symbol "HIVE.TO" and is no longer trading on the TSX Venture Exchange.
Basis of Presentation
The accompanying condensed interim consolidated financial statements (the "financial statements") are prepared in accordance with
generally accepted accounting principles in the United States of America ("U.S. GAAP") and include the results of the Company and
its wholly owned subsidiaries. Any reference in these notes to applicable guidance is meant to refer to the authoritative guidance found
in the Accounting Standards Codification ("ASC") and Accounting Standards Update ("ASU"). These financial statements are
presented in U.S. dollars, which is the functional currency of the Company. The results in the financial statements and these notes
include required estimates and assumptions of management, and they are not necessarily indicative of results to be expected for the
year ending March 31, 2027, or for any future interim period. Further, the financial statements and the notes do not include all the
information and notes required by GAAP for a complete presentation of annual financial statements. As such, the financial statements
and these notes should be read in conjunction with the consolidated financial statements for the year ended March 31, 2026, and notes
thereto, included in the 2026 Annual Report.
(i) Use of estimates
The preparation of these condensed interim consolidated financial statements in conformity with U.S. GAAP requires management to
make certain estimates, judgments, and assumptions that affect the reported amounts of assets and liabilities, and the disclosure of
contingent assets and liabilities, as of the date of the financial statements, as well as the reported amounts of revenues and expenses
during the reporting period. On an ongoing basis, the Company evaluates the estimates used, which include but are not limited to the:
estimates in the determination of the fair value of assets acquired and liabilities assumed in connection with acquisitions; discount rate
in determining lease liabilities; recoverability of long-lived assets including impairment of property, plant and equipment and their
associated useful lives, and assessment of the contingencies and tax liabilities.
These estimates, judgments, and assumptions are reviewed periodically, and the impact of any revisions are reflected in the financial
statements in the period in which such revisions are made. Actual results could differ from those estimates, judgments, or assumptions,
and such differences could be material to the Company's condensed interim consolidated financial position and results of operations.
5
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
2.
Basis of Presentation (continued)
(ii) Basis of consolidation
These condensed interim consolidated financial statements include the accounts of the Company and its wholly owned subsidiaries.
Subsidiaries are entities in which the Company has a controlling interest or is the primary beneficiary of a variable interest entity.
Subsidiaries are fully consolidated from the date control is transferred to the Company and are de-consolidated from the date control
ceases. The condensed interim consolidated financial statements include all the assets, liabilities, revenues, expenses and cash flows of
the Company and its subsidiaries after eliminating intercompany balances and transactions.
(iii) Foreign currency
Effective April 1, 2024, the Company's functional currency changed from the Canadian dollar to the U.S. dollar, which is prospectively
accounted for in these consolidated financial statements. The change in functional currency better reflects the ongoing activities and
operations of the Company.
For purposes of the Company's consolidated financial statements, the assets and liabilities of subsidiaries with a Canadian dollar
functional currency other than the U.S. dollar are translated into U.S. dollars. Gains and losses resulting from these translations are
reported as a component of accumulated other comprehensive income (loss) on the consolidated statements of comprehensive income
(loss). Revenue, expenses, and gains or losses are translated into U.S. dollars using average exchange rates for each period.
Gains and losses from the remeasurement of foreign currency transactions into the functional currency are recognized as a component
of other income, net on the consolidated statements of operations.
6
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
2.
Basis of Presentation (continued)
(iv) Significant Accounting Policies
Except for the update noted below, see the Company's 2026 Annual Report for a detailed discussion of the Company's significant
accounting policies.
Convertible Loan
Capped call transactions entered into in connection with convertible debt issuances are evaluated under ASC 815-40 to determine
whether they qualify for equity classification. Instruments that do not qualify for equity classification are recognized as derivative
assets or liabilities and measured at fair value at each reporting date, with changes in fair value recognized in the consolidated
statements of operations.
Fair value is determined using the black scholes option pricing model that incorporates relevant market-based inputs, including the
Company's share price, expected volatility, risk-free interest rate, expected term and contractual terms of the instruments. The fair value
measurement is classified within the appropriate level of the fair value hierarchy under ASC 820 based on the nature of the inputs used.
(v) Recent accounting standards
The following amendments to existing standards have been issued up to and including the date of issuance of these financial
statements, however are not yet effective for the Company:
Accounting Standards Update 2025-11, Interim Reporting (Topic 270): Narrow-Scope Improvements. The amendments in this
update clarify interim disclosure requirements and the applicability of Topic 270. The amendments are effective for annual
periods beginning after December 15, 2027. Early adoption is permitted. Upon adoption, the guidance can be applied
prospectively or retrospectively.
In September 2025, the FASB issued ASU 2025-06, Intangibles-Goodwill and Other - Internal-Use Software (Subtopic 35040): Targeted Improvements to the Accounting for Internal Use Software ("ASU 2025-06"). ASU 2025-06 eliminates the
distinction between software project development stages and clarifies the threshold applied to begin capitalizing costs. The
new standard is effective for the Company for its annual and interim periods beginning January 1, 2028, and permits
prospective, modified prospective, retrospective or early adoption. The Company is currently evaluating the impact of
adopting the standard.
In May 2025, the FASB issued ASU 2025-03, Business Combinations (Topic 805) and Consolidation (Topic 810):
Determining the Accounting Acquirer in the Acquisition of a Variable Interest Entity ("ASU 2025-03"), which amends the
guidance for identifying the accounting acquirer in transactions involving the acquisition of a variable interest entity that
meets the definition of a business. The guidance is intended to reduce diversity in practice and improve consistency in the
application of acquisition accounting. The new standard is effective for the Company for its annual periods beginning January
1, 2027, with early adoption permitted. The Company is currently evaluating the impact of adopting the standard.
7
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
3.
Asset Acquisitions
Acquisition of real property - Ontario
On May 15, 2026, the Company closed the acquisition of real property located around Ontario's Toronto-Waterloo innovation corridor.
In consideration, the Company paid $5 million cash and issued a mortgage to the seller in the amount of $4.4 million. The
consideration paid includes transaction costs of $0.6 million.
The Company determined that this transaction is an asset acquisition as the assets acquired did not constitute a business as defined by
ASC 805. The following table summarizes the consideration transferred, the estimated fair value of the identifiable assets acquired, and
liabilities assumed as the date of the acquisition:
June 30, 2026
Cash paid
Mortgage (Note 14)
Acquisition costs
Total consideration
$
$
4,354
4,363
618
9,335
Land
Net assets acquired
$
$
9,335
9,335
Acquisition of real property - Ontario
On January 30, 2026, the Company closed the acquisition of real property located around Ontario's Toronto-Waterloo innovation
corridor. In consideration, the Company paid $21.6 million cash and issued a mortgage to the seller in the amount of $14.7 million. The
consideration paid includes transaction costs of $2.0 million.
The Company determined that this transaction is an asset acquisition as the assets acquired did not constitute a business as defined by
ASC 805. The following table summarizes the consideration transferred, the estimated fair value of the identifiable assets acquired, and
liabilities assumed as the date of the acquisition:
January 30, 2026
Cash paid
Mortgage (Note 14)
Acquisition costs
Total consideration
$
$
19,547
14,747
2,026
36,320
Land
Net assets acquired
$
$
36,320
36,320
8
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
3.
Asset Acquisitions (continued)
Acquisition of Megawatt Mining Corp.
On September 15, 2025, the Company closed the acquisition of real property located at 15 City View Drive, Toronto, Ontario and
shares of Megawatt Mining Corp. from an unrelated party. In consideration, the Company paid $9.2 million cash and issued 1 million
common shares of the Company. The consideration paid includes transaction costs of $556.
The Company determined that this transaction is an asset acquisition as the assets acquired did not constitute a business as defined by
ASC 805. The following table summarizes the consideration transferred, the estimated fair value of the identifiable assets acquired, and
liabilities assumed as the date of the acquisition:
September 15, 2025
Cash paid
Share consideration
Acquisition costs
Total consideration
$
Cash
Deposits
Building and land
GST receivables
Accounts payable
Total assets
Deferred tax liability
Net assets acquired
$
$
$
8,692
3,919
556
13,167
59
109
12,919
151
(71)
13,167
13,167
9
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
3.
Asset Acquisitions (continued)
Acquisition of Zunz S.A.
Effective March 17, 2025 the Company closed the acquisition of Zunz S.A. with an unrelated party. In consideration, the Company
paid $25 million cash up front and will pay the remaining purchase price of $31 million over six months. The consideration paid also
includes transaction costs of $692 and cash advanced by the Company after January 28, 2025. The Company fully paid the acquisition
loan payable by March 31, 2026 (March 31, 2025 - $31 million).
The Company determined that this transaction is an asset acquisition as the assets acquired did not constitute a business as defined by
ASC 805. The following table summarizes the consideration transferred, the estimated fair value of the identifiable assets acquired, and
liabilities assumed as the date of the acquisition:
March 31, 2025
Cash paid
Acquisition loan payable
Cash advance
Acquisition costs
Total consideration
$
Land
Equipment
Building and leasehold
Power purchase agreement guarantee
VAT receivables
Other
Total assets
Deferred tax liability
Net assets acquired
$
$
$
25,000
31,000
7,260
692
63,952
952
44
57,070
3,314
3,126
52
64,558
(606)
63,952
Investments
As at June 30, 2026 and 2025, the Company holds investments in both private and public companies. The Company has elected to
measure its investments in equity securities of private companies at fair value with changes through profit or loss.
June 30, 2026
Marketable securities
Equity securities of private companies (Note 25)
Funds (Note 25)
$
$
7,637
458
2,763
10,858
March 31, 2026
$
$
6,624
463
2,654
9,741
Marketable securities are level 1 fair value measurements as they are publicly traded equity securities, whereas the investments in
private companies are level 3 fair value measurements. The funds are measured at their net asset value.
During the three-month period ended June 30, 2026, the Company recognized $1,277 of unrealized losses on equity instruments held at
June 30, 2026, of which $1 is related to an unrealized loss on private company investments. During the three-month period ended June
30, 2025, the Company recognized $8,172 of unrealized gains on equity instruments held at June 30, 2025, of which $13 is related to
its private company investments.
10
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
5.
Amounts Receivable and Prepaids
June 30, 2026
Sales tax receivable
Prepaid expenses and other receivables
Receivable on sale of subsidiary (1)
Accounts receivable and prepaids, gross
$
Provisions and liability on sales tax receivable, opening
Impairment of receivable on sale of subsidiary(1)
Recovery and reversal
Foreign exchange
Provisions on sales tax receivable
Accounts receivable and prepaids, net
Less: current portion
Long term portion
$
13,180
10,823
1,816
25,819
March 31, 2026
$
13,370
7,484
1,816
22,670
(4,957)
76
(4,881)
20,938
(6,633)
(1,816)
2,467
1,025
(4,957)
17,713
(18,887)
2,051 $
(15,566)
2,147
(1) This balance is conditional upon ruling by the Swedish Tax Authority related to an ongoing process in connection with certain
value added tax (VAT) balances remitted and or claimed by the Company. If the ruling is favourable; amounts will be received;
otherwise, the amounts will not be collectible. Management has assessed the collectability using a probability model under a range
of scenarios and this receivable reflects the results of that process. Management has assessed the collectability of the receivable
based on the financial worthiness of the counterparty, and in light of recent events the Company impaired the full amount of the
receivable in fiscal 2026. The amount is recorded as impairment of receivable on sale of subsidiary on the consolidated statements
of loss and comprehensive loss.
During the year ended March 31, 2024, after examination of the history of claims and payments received from various authorities,
together with regulatory challenges, the Company assessed the collectability of its Sales tax receivable balance. As a result, the
Company determined that there is uncertainty over the collection of certain amounts and recorded a provision of $4.5 million for these
receivables. During the year ended March 31, 2025, the Company recorded an recovery of $1.3 million and an additional provision of
$0.3 million which was paid for by the Company during the year ended March 31, 2026.
The Company also received an assessment of $2.3 million for Sales tax payable that is included in the provision as a result of a Sales
tax audit related to periods prior to the acquisition of 9376-9974 Quebec Inc. in 2021. During the year ended March 31, 2026, the
Company received sales tax credits totalling $2.3 million that were applied against this assessment and accrued interest. During the
period ended June 30, 2026, there were no additional provisions, recoveries, or assessments recorded in respect of these matters.
Credit risk
Credit risk is the risk that one party to a financial instrument will fail to discharge an obligation and cause the other party to incur a
financial loss. The Company's primary exposure to credit risk is on its cash held in bank accounts as at June 30, 2026. The majority of
cash is deposited in bank accounts held primarily with one major bank in Canada so there is a concentration of credit risk. This risk is
managed by using a major bank that is a high credit quality financial institution as determined by rating agencies.
The Company is exposed to credit risk related to amounts receivable from the Swedish government related to VAT filings and from the
Canadian and Quebec governments related to the sales tax filings (Note 16).
11
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
6.
Digital Currencies
Digital currencies are recognized at their fair value on the date they are received as revenue from digital currency mining and are
revalued to their current market value at each reporting date.
The Company's holdings of digital currencies consist of the following:
June 30, 2026
Bitcoin
Other currencies
Total
$
$
March 31, 2026
11,065 $
183
11,248 $
10,612
210
10,822
The continuity of digital currencies was as follows:
Bitcoin
Digital currencies, March 31, 2025
Digital currency mined (non-cash consideration)
Digital currency purchased
Digital currency sold
Deposit on equipment (i)
Revaluation adjustment
Digital currencies, March 31, 2026
Digital currency mined (non-cash consideration)
Digital currency sold
Deposit on equipment (i)
Revaluation adjustment
Digital currencies, June 30, 2026
Amount
Number of coins
$
180,741
2,201
$
278,253
18,330
(276,681)
(190,153)
122
10,612
2,885
172
(2,969)
(2,139)
150
1,004
(918)
(46)
$
72,060
(66,817)
(3,238)
(1,552)
11,065
190
The following table summarizes the Company's net realized and unrealized gains (losses) on digital currencies:
June 30, 2026
Cumulative realized gain (loss)
Revaluation (loss) gain
Net realized and unrealized (losses) gains
$
$
765 $
(1,574)
(809) $
June 30, 2025
17,270
5,891
23,161
During the period ended June 30, 2026, the Company sold digital currencies for proceeds totalling $70.8 million (June 30, 2025 $265.5 million)
(i) The Company enters into certain equipment purchase agreements whereby the Company has the right to pay for the equipment
deposit using Bitcoin. If the deposit is paid in Bitcoin the Company has an option to repurchase the Bitcoin in the future at the price on
the date that the deposit in Bitcoin was made. During the period ended June 30, 2025 the Company exercised certain options and
repurchased a total of 86 Bitcoin at a strike price of $88 resulting in a gain of $1.4 million in the condensed interim consolidated
statements of loss and comprehensive loss (Note 25). There were no exercises during period ended June 30, 2026.
12
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
6.
Digital Currencies (continued)
During the period ended June 30, 2026 the Company transferred 46 Bitcoin (March 31, 2026 - 2,139 Bitcoin), as a deposit on
equipment and received an option to repurchase the Bitcoin. The option is initially measured at fair value on the respective issuance
dates included in the table below, using the Black- Scholes option pricing model with the following assumptions:
Spot rate ($)
Strike price ($)
Risk-free interest rate
Expected life (years)
Annualized volatility
Number of Bitcoin
Contract value ($)
Fair value - initial ($)
January 7,
2026
March 7,
2026
April 19,
2026
91
110
3.48%
1.01
45.92%
106
11,665
1,225
67
110
3.54%
1.01
51.21%
60
6,648
266
74
110
3.64%
1.01
44.34%
46
5,017
210
The options are remeasured each reporting period. As at June 30, 2026 and March 31, 2026, the options were valued using the BlackScholes option pricing model with the following assumptions:
Spot price ($)
Strike price ($)
Risk-free interest rate
Expected life (years)
Annualized volatility
Number of Bitcoin pledged
June 30, 2026
March 31, 2026
59
110
3.86%-3.93%
0.53-0.81
43.23%
212
68
110
3.60% - 3.71%
0.79 - 0.95
51.37%
166
As at June 30, 2026, the Company holds options to repurchase 212 Bitcoin (March 31, 2026 - 166) and the fair value of these options is
$0.1 million (March 31, 2026 - $0.6 million). During the period ended June 30, 2026, the Company recognized a remeasurement loss
of $0.7 million (June 30, 2025 - remeasurement gain of $16.6 million) (Note 25).
The derivative asset continuity is outlined below:
June 30, 2026
Balance, at April 1
Additions
Modifications and exercises
Expirations
Change in fair value
Balance, at March 31
$
$
606
210
(719)
97
BTC
166 $
46
212 $
March 31, 2026
1,300
35,166
(12,807)
(6,471)
(16,582)
606
BTC
172
2,245
(799)
(1,452)
166
13
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
7. Property, Plant and Equipment
Property, plant and equipment consist of the following components:
June 30, 2026
Equipment
Land
Building
Total
Accumulated depreciation
Net carrying value
$
$
March 31, 2026
650,380 $
65,120
160,285
875,785
(422,633)
453,154 $
652,672
47,065
157,236
856,973
(376,497)
480,476
The Company depreciates its property, plant and equipment over the remaining estimated useful economic life.
- Deposits
The deposits relate to required amounts on account with electricity providers in Sweden and Paraguay, and deposits for equipment
purchases, consisting of:
Description
Utility energy deposits*
Equipment deposits
Import duty deposits and other
Bell Canada**
Deposits, gross
Equipment deposit provision, opening and closing
Deposits, net
June 30, 2026
$
$
March 31, 2026
38,753 $
50,428
1,054
4,894
95,129
34,791
20,651
2,074
8,194
65,710
(12,131)
82,998 $
(12,131)
53,579
The Company is exposed to counterparty risk through the advances made for certain mining equipment ("Deposits") it places with its
suppliers in order to secure orders over a set delivery schedule. The risk of a supplier failing to meet its contractual obligations may
result in late deliveries and/or the value of the deposits is not realised from non delivery of equipment or delivery of equipment with
reduced quality. The Company attempts to mitigate this risk by procuring mining hardware from the established suppliers and with
whom the Company has existing relationships and knowledge of their reputation in the market.
During the period ended June 30, 2026, the Company recorded expected credit losses on the deposits of $nil (June 30, 2025 - $nil) in
the consolidated statements of loss and comprehensive loss. The expected credit losses are based on the counterparty risk of delivery,
efficiency of machines expected use of the machines and the expected quantity and quality of the equipment to be received.
*During the year ended March 31, 2025, the Company entered into a 100 MW power supply agreement with the National
Administration of Electricity ("ANDE") in Paraguay. The Company paid a $3.4 million security deposit for one month of estimated
consumption of electric energy and power per terms of the agreement. On March 17, 2025, the Company acquired Zunz S.A. (Note 3),
which held a 200 MW power supply agreement with ANDE. Under this agreement, Zunz S.A. was required to provide $19.2 million in
deposits, of which $3.3 million had been paid at the time of acquisition. The Company paid the remaining $15.9 million on April 2,
2025. On October 20, 2025, Zunz S.A. entered into an additional 100 MW power supply agreement with ANDE and paid a $3.2 million
security deposit for one month of estimated consumption of electric energy and power per terms of the agreement.
14
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
8. Deposit (continued)
The Company has a commitment to pay for another two months of estimated consumption before sixty calendar days from the start of
the supply or within 12 months following the signing of the 100 MW power supply agreement, whichever, occurs first. On August 29,
2025, the Company paid the remaining two-month deposit totalling $6.4 million for energization of the site. In addition, the Company
will need to provide a letter of credit, valid until April 1, 2028, for an amount equivalent to two months of estimated consumption of
electric energy and power within 12 months of signing the power supply agreement. In an addendum to the power supply agreement
dated June 20, 2025, the requirement for a letter of credit was removed and no longer required. In addition to the 100 MW power
supply agreement, on February 17, 2026, the Company entered into an additional 7 MW power supply agreement with ANDE for its
Valenzuela facility in Paraguay and paid a $0.6 million security deposit for three months of estimated consumption of electric energy
and power per terms of the agreement.
**On August 1, 2025, the Company entered into an agreement with Bell Canada Inc. for lease of a 4 MW facility for a five year term
which requires a security deposit of $5.8 million to cover recurring service fees and a one-time license fee of $2.4 million. On
December 15, 2025, the Company paid the deposit amount and license fee. On March 13, 2026, the agreement was amended to reduce
the committed capacity to 1 MW from 4 MW and the Company retained the option to procure up to an additional 3 MW of capacity.
The security deposit required was then amended to $1.5 million and one time license fee to $0.6 million. On March 13, 2026, the
Company entered into an agreement with Bell Canada Inc. for lease of a 5 MW facility for a ten year term which requires a one-time
license fee of $3 million. The credits from the security deposit and license fee paid of $8.2 million were applied to the license fee of $3
million with the remainder amount of $3.1 million credited towards to the Merrit facility.
Accounts Payable and Accrued Liabilities
The components of accounts payable and accrued liabilities are as follows:
June 30, 2026
Accounts payable
Accrued liabilities
Holdback payable
Other payable*
Provision for regulatory liabilities (Note 16)
March 31, 2026
$
12,823 $
15,940
500
4,491
84,650
10,676
12,795
500
3,074
$
118,403 $
27,045
As at June 30, 2026, included in other payable is $2.2 million (March 31, 2026 - $2.2 million) customer refundable deposit for high
performance computing service agreement covering two month service fee.
- Convertible Loans
i. $15 million convertible note
On January 12, 2021, the Company closed its non-brokered private placement of unsecured debentures (the "Debentures"), for
aggregate gross proceeds of $15 million with U.S. Global Investors, Inc. ("U.S. Global"). The Executive Chairman of the Company is a
director, officer and controlling shareholder of U.S. Global.
The Debentures mature on the date that is 60 months from the date of issuance, bearing interest at a rate of 8% per annum. The
Debentures will be issued at par, with each Debenture being redeemable by the Company at any time, and convertible at the option of
the holder into common shares in the capital of the Company at a conversion price of C$15.00 per share. Interest is payable monthly,
and principal repayments are quarterly. In addition, U.S. Global was issued 5 million common share purchase warrants (the
"Warrants"). Each five whole Warrant entitles U.S. Global to acquire one common at an exercise price of C$15.00 per Share for a
period of three years from closing. The Warrants expired unexercised on January 12, 2024.
15
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
10. Convertible Loans (continued)
i. $15 million convertible note (continued)
Prior to the Company's change in functional currency on April 1, 2024, the Company determined that the Convertible Loan contained
an embedded derivative liability because the conversion feature was not indexed to the Company's stock. The conversion feature was
not indexed to the Company's stock because the loan is denominated in U.S. dollars and changes in the exchange rate will impact the
expected cash flows upon the instrument's settlement. Consequently, the conversion feature was classified as a derivative liability. As of
April 1, 2024, the conversion feature was reclassified to equity.
The Company allocated the proceeds of $15.0 million first to the derivative component for $8.6 million, with the residual value to the
liability component for $6.4 million. The derivative component was valued on initial recognition using the Black-Scholes option
pricing model with the following assumptions: a risk-free interest rate of 0.69%; an expected volatility of 105%; an expected life of
2.71 years; a forfeiture rate of zero; and an expected dividend of zero
ii. $115 million convertible note
On April 21, 2026, the Company's wholly-owned subsidiary, HIVE Bermuda 2026 Ltd. (the "Issuer"), issued $115 million aggregate
principal amount of 0% exchangeable senior notes (the "Notes") due 2031, which included the full exercise of the initial purchasers'
option to purchase an additional $15 million principal amount of Notes. The Notes are unsecured, guaranteed by the Company, do not
bear interest, and mature on April 15, 2031, unless earlier exchanged, redeemed or repurchased. In connection with the offering, the
Company entered into capped call transactions with certain financial institutions to reduce the potential dilution to its common shares
(or reduce the Company's cash payment obligation if the Notes are settled in cash) if the trading price of the Company's common shares
exceeds the exchange price of the Notes at the time of exchange. The capped calls are a legally separate derivative instrument
accounted for separately from the Notes.
Prior to January 15, 2031, the Notes may be exchanged only upon the occurrence of certain events, including: (i) during specified
periods when the market price of the Company's common shares exceeds 130% of the applicable exchange price, (ii) during specified
periods when the trading price of the Notes is less than 98% of the product of the last reported sale price of the Company's common
shares and the applicable exchange rate, (iii) following a notice of redemption by the Company, or (iv) upon the occurrence of specified
corporate events. On or after January 15, 2031 and until the close of business on the second scheduled trading day immediately
preceding the maturity date, holders may exchange their Notes at any time, regardless of these conditions.
Upon exchange, the Company may settle the obligation in cash, common shares, or a combination of both, at its discretion. The initial
exchange rate is 389.5029 common shares per $1,000 principal amount, equivalent to an initial exchange price of approximately $2.57
per share, representing a 17.5% premium over the $2.185 reference price. The $2.185 reference price is the last reported sale price of
the Company's common shares on Nasdaq on April 16, 2026. The exchange rate is subject to customary anti-dilution adjustments and,
in certain circumstances, may be increased for exchanges in connection with a make-whole fundamental change or following a notice
of redemption.
The Notes are not redeemable prior to April 20, 2029, except upon the occurrence of certain changes in laws governing Canadian
withholding taxes. On or after April 20, 2029, the Company may redeem the Notes, in whole or in part, for cash if the last reported sale
price of its common shares has been at least 130% of the exchange price for at least 20 trading days, whether or not consecutive, during
any 30 consecutive trading day period ending on, and including, the trading day immediately preceding the date on which the Company
provides notice of redemption. Holders will also have the right to require the Company to repurchase their Notes for cash on April 15,
2029, and, in the event of a fundamental change, at any time thereafter, in each case at 100% of the principal amount thereof, plus
accrued and unpaid interest, if any, up to, but excluding, the repurchase date.
As at June 30, 2026, none of the conditions permitting the holders of the Notes to exchange their Notes early or to require the Company
to repurchase the Notes for cash have been met. Accordingly, the Notes are classified as long-term debt.
Transaction costs of $5.2 million relating to agent fees and legal fees were capitalized and deducted from the carrying amount of the
Notes. Net proceeds from the offering were $109.8 million.
16
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
10. Convertible Loans (continued)
iii. $130 million convertible note
On June 30, 2026, the Company's wholly-owned subsidiary, HIVE Bermuda 2026 Ltd. (the "Issuer"), issued $130 million aggregate
principal amount of 0% exchangeable senior notes (the "Notes") due 2031, which included the full exercise of the initial purchasers'
option to purchase an additional $15 million principal amount of Notes. The Notes are unsecured, guaranteed by the Company, do not
bear interest, and mature on July 1, 2031, unless earlier exchanged, redeemed or repurchased. In connection with the offering, the
Company entered into capped call transactions with certain financial institutions to reduce the potential dilution to its common shares
(or reduce the Company's cash payment obligation if the Notes are settled in cash) if the trading price of the Company's common shares
exceeds the exchange price of the Notes at the time of exchange. The capped calls are a legally separate derivative instrument
accounted for separately from the Notes.
Prior to April 1, 2031, the Notes may be exchanged only upon the occurrence of certain events, including: (i) during specified periods
when the market price of the Company's common shares exceeds 130% of the applicable exchange price, (ii) during specified periods
when the trading price of the Notes is less than 98% of the product of the last reported sale price of the Company's common shares and
the applicable exchange rate, (iii) following a notice of redemption by the Company, or (iv) upon the occurrence of specified corporate
events. On or after April 1, 2031 and until the close of business on the second scheduled trading day immediately preceding the
maturity date, holders may exchange their Notes at any time, regardless of these conditions.
Upon exchange, the Company may settle the obligation in cash, common shares, or a combination of both, at its discretion. The initial
exchange rate is 206.9429 common shares per $1,000 principal amount, equivalent to an initial exchange price of approximately $4.83
per share, representing a 27.5% premium over the $3.79 reference price. The $3.79 reference price is the last reported sale price of the
Company's common shares on Nasdaq on June 25, 2026.
The exchange rate is subject to customary anti-dilution adjustments and, in certain circumstances, may be increased for exchanges in
connection with a make-whole fundamental change or following a notice of redemption.
The Notes are not redeemable prior to July 5, 2029, except upon the occurrence of certain changes in laws governing Canadian
withholding taxes. On or after July 5, 2029, the Company may redeem the Notes, in whole or in part, for cash if the last reported sale
price of its common shares has been at least 130% of the exchange price for at least 20 trading days, whether or not consecutive, during
any 30 consecutive trading day period ending on, and including, the trading day immediately preceding the date on which the Company
provides notice of redemption. Holders will also have the right to require the Company to repurchase their Notes for cash on July 1,
2030, and, in the event of a fundamental change, at any time thereafter, in each case at 100% of the principal amount thereof, plus
accrued and unpaid interest, if any, up to, but excluding, the repurchase date.
As at June 30, 2026, none of the conditions permitting the holders of the Notes to exchange their Notes early or to require the Company
to repurchase the Notes for cash have been met. Accordingly, the Notes are classified as long-term debt.
Transaction costs of $5.1 million relating to agent fees and legal fees were capitalized and deducted from the carrying amount of the
Notes. Net proceeds from the offering were $124.9 million.
17
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
10.
Convertible Loans (continued)
Liability Component
$15M
January 2021
Convert
Balance, March 31, 2025
Principal payment
Interest payment
Accretion and interest
Balance, March 31, 2026
Principal payment
Accretion and interest
Balance, June 30, 2026
$
$
$115M April
2026 Convert
1,871 $
(2,333)
(94)
556
109,801
211
110,012
$130M June
2026 Convert
$
$
124,860
124,860
Total
$
$
234,661
211
234,872
Derivative Component
Balance, March 31, 2026 and 2025
Additions
Change in Fair Value
Balance, June 30, 2026
$15M
January 2021
Convert
$
$
$115M April
$130M June
2026 Convert
2026 Convert
$
- $
19,769
15,730
(4,601)
$
15,167 $
15,730
$
$
Total
35,499
(4,601)
30,897
In connection with the January 2021 convertible note, the derivative component was remeasured at fair value on June 30, 2026,
immediately prior to the reclassification to equity. The derivative component was valued at $0.1 million using the Black-Scholes option
pricing model with the following assumptions: share price of C$4.56 an expected weighted average risk-free interest rate of 4.5%; an
expected weighted average volatility of 79%; and an expected weighted average life of 1.1 years.
In connection with the April 2026 $115 million exchangeable notes, the Company entered into capped call transactions with certain
financial institutions, funded using approximately $19.8 million of cash on hand. The capped call transactions have a cap price of $4.92
per share, representing a 125% premium over the $2.185 reference price. The capped call transactions do not meet the scope exception
from derivative accounting, as they fail the equity classification requirements because the Company cannot settle these transactions by
means other than cash, and are therefore treated as a derivative asset measured at fair value.
In connection with the June 2026 $130 million exchangeable notes, the Company entered into capped call transactions with certain
financial institutions, funded using approximately $15.7 million of cash on hand. The capped call transactions have a cap price of
$8.5275 per share, representing a 125% premium over the $3.79 reference price. The capped call transactions do not meet the scope
exception from derivative accounting, as they fail the equity classification requirements because the Company cannot settle these
transactions by means other than cash, and are therefore treated as a derivative asset measured at fair value.
18
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
11.
Warrant Liability
As part of the change in the Company's functional currency from the Canadian dollar to the U.S. dollar during the year ended March
31, 2025, all of the Company's issued and outstanding warrants were reclassified from equity to liability. The warrants have strike
prices denominated in Canadian dollars and are not indexed to the Company's stock because of the change in functional currency.
Warrants outstanding
2,875,000
2,875,000
Balance, March 31, 2026 and 2025
Balance, June 30, 2026
The warrant is re-valued each reporting period. As at June 30, 2026, the warrant liability was revalued at $2.2 million (March 31, 2026
- $0.4 million) using the Black-Scholes option pricing model with the following assumptions:
June 30, 2026
$5.18
2.40%
0.50
91.9%
0%
Stock price (C$)
Risk-free interest rate
Expected life (years)
Annualized volatility
Dividend rate
March 31, 2026
$ 2.60
2.33%
0.75
88%
0%
The warrants outstanding and exercisable as at June 30, 2026 are as follows:
Outstanding
2,875,000 **
2,875,000
Exercisable
2,875,000
2,875,000
Exercise Price
C$
6.00
Expiry date
December 28, 2026
- On November 30, 2021, the Company completed an agreement with Stifel GMP as lead underwriter and sole book runner to include
a syndicate of underwriters (the "Underwriters"), whereby the Underwriters will purchase, on a bought-deal basis, 3,834,100 special
warrants of the Company (the "2021 Special Warrants") at a price of C$30.00 per Special Warrant for aggregate gross proceeds to the
Company of C$115 million (the "Offering"). On January 12, 2022, each 2021 Special Warrant was deemed to be exercised into one
Unit comprised of one common share of the Company and one-half of one common share purchase warrant (each whole common share
purchase warrant being a "Warrant"). Each Warrant is exercisable for one share on or before May 30, 2024, at an exercise price of
C$30.00 per Share. These warrants expired unexercised on May 30, 2024.
On December 1, 2021, the Company issued 106,677 warrants as consideration for an investment in Titan.io. Each Warrant is
exercisable for one share on or before September 15, 2024, at an exercise price of C$30.00 per Share. These warrants expired
unexercised on September 15, 2024.
** On December 28, 2023, the Company completed a bought-deal financing of 5,750,000 special warrants of the Company (the "2023
Special Warrants") at a price of C$5.00 per Special Warrant for aggregate gross proceeds to the Company of C$28.75 million (the
"Offering"). Each 2023 Special Warrant entitles the holder to receive without payment of additional consideration, one unit of the
Company upon exercise consisting of one common share and one-half of common share purchase warrant.
On February 2, 2024, the 2023 Special Warrants were deemed exercised into one unit of the Company comprised of one common share
of the Company and one-half of one common share purchase warrant. Each whole warrant entitles the holder thereof to purchase one
common share of the Company at an exercise price of C$6.00 per whole warrant until December 28, 2026. In consideration of services,
the Underwriters received a cash commission of C$1.725 million, and 345,000 broker warrants. Each broker warrant entitles the holder
to acquire one common share of the Company at an exercise price of C$5.00 per broker warrant until December 28, 2026. The broker
warrants were valued at $1.28 million using the Black-Scholes option pricing model with the following assumptions: a risk-free interest
rate of 3.51%, an expected volatility of 100%, an expected life of 3 years, a forfeiture rate of zero; and an expected dividend of zero.
The Company also incurred C$257 in professional and other fees associated with the 2023 Special Warrant financing.
19
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
12.
Loans Payable
On March 31, 2021, as part of the sale of the net assets in Boden Technologies AB, the Company incurred a loan payable. The facility
bears interest at the Swedish government borrowing rate plus 1% per annum and has a maturity date of December 31, 2035. Principal
payment plus interest is payable annually. The loan payable is contingently forgiven based on a favourable ruling from the Swedish Tax
Authority on the ongoing value tax assessment.
The continuity is outlined below:
Balance, March 31, 2025
Interest
Repayment
Foreign exchange movement
Balance, March 31, 2026
$
Interest
Repayment
Foreign exchange movement
Balance, June 30, 2026
Less: current portion
Non-current portion
12,992
244
(3,096)
817
10,957
195
(235)
10,917
$
(1,460)
9,457
Term Loan
As part of the Atlantic acquisition, the Company acquired an $11.0 million (C$13.6 million) term loan ("Atlantic Term Loans"). The
Atlantic Term Loans were made up of two discrete balances; Term Loan 1 and Term Loan 2; and the total facility bearing an interest
rate of 3.33% per annum with a term maturity date of June 30, 2024.
On June 30, 2024, the Company renewed Term Loan 1 over a 1-year term at an interest rate of 5.31% with a balance remaining of
C$4.2 million, and Term Loan 2 was renewed at 5.15% over a 2-year term with a balance remaining of C$2.6 million. Principal
payments of C$0.2 million plus interest is payable monthly.
On June 30, 2025, the Company renewed Term Loan 1 over a 1-year term at an interest rate of 4.39% with a balance remaining of
C$2.8 million. The principal and interest payment are the same as noted above.
On April 21, 2025, the Company received a covenant amendment from its lender in relation to the Atlantic Term Loans maintained by
HIVE Atlantic Datacentres Ltd. As part of this modification, the lender formally withdrew the following financial covenants:
A minimum working capital ratio of 1.20:1
A maximum long-term debt to tangible net worth ratio of 2.00:1
The following covenant remains in effect and must be maintained at all times:
A minimum debt service coverage ratio to EBITDA of 1.50:1
As at June 30, 2026, HIVE Atlantic Datacentres Ltd. was in compliance with the amended required debt service coverage ratio
covenant. The outstanding balance is presented as a current liability as at June 30, 2026, because it matures within one year. The
Atlantic Term Loans include an unlimited guarantee from the Company.
20
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
13. Term Loan (continued)
Balance, March 31, 2025
Interest
Repayment
Foreign exchange movement
Balance, March 31, 2026
Interest
Repayment
Foreign exchange movement
Balance, June 30, 2026
$
Term Loan 1 Term Loan 2
2,191 $
1,367 $
85
58
(1,098)
(690)
77
48
1,255
783
13
(266)
(17)
985 $
$
10
(167)
(11)
615 $
Total
3,558
143
(1,788)
125
2,038
22
(433)
(27)
1,600
- Mortgage payable
As part of the acquisition of real property located in Ontario described in Note 3, the Company issued a vendor takeback mortgage to
the seller. The mortgage has a principal of $4.3 million (C$6 million), bears interest at 6.00% annually and interest payments are due on
a quarterly basis. The mortgage has a term of three years and the full amount of the principal is due at maturity.
As part of the acquisition of real property located in Ontario described in Note 3, the Company issued a vendor takeback mortgage to
the seller. The mortgage has a principal of $14.7 million (C$20 million), bears interest at 6.00% annually and interest payments are due
on a quarterly basis. The mortgage has a term of two years and the full amount of the principal is due at maturity.
The continuity is outlined below:
Balance, March 31, 2025
Addition
Interest
Repayment
Foreign exchange movement
Balance, March 31, 2026
Addition
Interest
Repayment
Foreign exchange movement
Balance, June 30, 2026
Mortgage 1 Mortgage 2
- $
- $
14,747
145
26
(400)
14,492
4,363
217
26
(217)
(278)
(141)
14,214 $
4,248 $
$
$
Total
14,747
145
(400)
14,492
4,363
243
(217)
(419)
18,462
21
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
15. Right of Use Asset and Operating Lease Liability
The Company has lease agreements for its offices, data centers and equipment.
Right of use assets
June 30, 2026
Cost
Accumulated amortization
Net carrying value
$
March 31, 2026
119,927 $
(13,516)
106,411 $
$
53,108
(10,012)
43,096
Lease liabilities
Operating Leases
June 30,
March 31
2026
2026
Current
Non-current
$
$
2,956
77,775
80,731
$
$
3,323
10,351
13,674
Finance Leases
June 30,
March 31,
2026
2026
$
$
9,260
18,462
27,722
$
$
9,045
20,861
29,906
June 30,
2026
$
$
Total
March 31,
2026
12,216
96,237
108,453
$
$
June 30, 2026
March 31, 2026
Operating Leases
Weighted average discount rate
Weighted average remaining lease term (in years)
11.16%
8.98
7.27%
4.85
Finance Leases
Weighted average discount rate
Weighted average remaining lease term (in years)
9.90%
2.75
9.90%
3.00
12,368
31,212
43,580
22
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
15. Right of Use Asset and Operating Lease Liability (continued)
Additional information on the lease liabilities as at June 30, 2026 is as follows:
Operating
leases
2027
2028
2029
2030
Thereafter
Total undiscounted lease liabilities
Interest on lease liabilities
Total present value of minimum lease payments
Lease liability - current portion
Lease liability
$
$
$
$
11,454
13,896
13,311
13,792
79,613
132,066
(51,335)
80,731
2,956
77,775
Finance leases
$
$
$
$
11,404
11,404
8,554
31,362
(3,639)
27,722
9,260
18,462
Total
$
$
$
$
22,858
25,300
21,865
13,792
79,613
163,428
(54,975)
108,453
12,216
96,237
Additional information on the lease liabilities as at March 31, 2026 is as follows:
Operating
leases
2027
2028
2029
2030
Thereafter
Total undiscounted lease liabilities
Interest on lease liabilities
Total present value of minimum lease payments
Lease liability - current portion
Lease liability
$
$
$
$
4,155
3,154
2,407
2,180
4,423
16,319
(2,645)
13,674
3,323
10,351
Finance leases
$
$
$
$
11,404
11,404
11,405
34,213
(4,307)
29,906
9,045
20,861
Total
$
$
$
$
15,559
14,558
13,812
2,180
4,423
50,532
(6,952)
43,580
12,368
31,212
The Company incurred the following lease costs which were recorded in operating and maintenance costs in the consolidated
statements of loss and comprehensive loss:
Three months ended
June 30, 2026 June 30, 2025
Variable lease costs (CPI adjustments)
Operating lease costs:
Depreciation of lease assets
Interest on lease liabilities
Finance lease costs:
Depreciation of lease assets
Interest on lease liabilities
Total lease costs
$
$
125 $
96
2,190
2,108
4,423
642
82
820
1,467
667
6,557 $
820
Cash paid for amounts included in the measurement of lease liabilities:
Three months ended
June 30, 2026 June 30, 2025
Cash flows from operating leases
Cash flows from finance leases
$
$
1,269 $
2,851 $
867
23
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
16. Commitments and Contingencies
Commitments
(a) Service agreements
The Company has service agreements with unrelated third parties to operate and maintain the Company's data center computing
equipment for the purpose of mining crypto currency in Canada, Sweden and Iceland. As part of the arrangement, proprietary
software is installed on the Company's computing equipment to assist in optimizing the use of the equipment.
(b) Power purchase agreement
The Company entered into a supplemental power pricing arrangement that provides a fixed price of electricity consumption each
month at the Company's Bikupa Datacenter AB and Bikupa Datacenter 2 AB location in Sweden. The fixed price agreement was
assessed and is being accounted for as an executory contract; electricity costs are expensed as incurred.Obligations on mining
equipment and development costs
The Company had purchase commitments of $174.5 million at the period ended June 30, 2026 (March 31, 2026 - $29.1 million).
Contingencies
(a) Litigation
From time to time, the Company is involved in routine litigation incidental to the Company’s business. Management believes that
adequate provisions have been made where required and the ultimate resolution with respect to any claim will not have a material
adverse effect on the financial position or results of the operations of the Company.
(b) Contingent Tax Liability to the Canada Revenue Agency ("CRA")
The Company and certain of its wholly-owned subsidiaries — including 9376-9974 Québec Inc., Hive Digital Data Ltd.
(incorporated in Bermuda), and Hive Atlantic Datacentres Ltd. ("Hive Atlantic") — are engaged in ongoing disputes with the
Canada Revenue Agency ("CRA") and provincial tax authorities. Management, together with its external tax and legal advisors,
continues to pursue resolution of these matters through the applicable objection, appeal, and administrative processes. The
significant matters are as follows:
9376-9974 Québec Inc. received Notices of Assessment from Revenu Québec denying capital cost allowance ("CCA") claimed on
certain assets for its taxation years ended December 31, 2021 through 2024. The total amount assessed, including interest and
penalties, is C$5.4 million. 9376-9974 Québec Inc. is disputing this assessment and intends to file a notice of objection.
The Company is disputing disallowed input tax credits of C$0.3 million for reporting periods from July 1, 2017 to June 30, 2021.
The Company also received a Notice of Reassessment from the CRA, issued July 27, 2026, in the amount of C$4 million, inclusive
of interest and penalties, asserting that GST/HST should apply to treasury and currency management services supplied by the
Company to Hive Digital Data Ltd. for the period from July 1, 2021 to March 31, 2023, on the basis that Hive Digital Data Ltd.
has a permanent establishment in Canada. The Company is disputing this reassessment.
Hive Atlantic is disputing a GST/HST reassessment of C$4.2 million in respect of reporting periods from May 1, 2021 to
December 31, 2021, and has filed a Notice of Appeal with the Tax Court of Canada. Hive Atlantic also received a proposal letter
from the CRA quantifying proposed GST/HST adjustments of C$50.5 million, exclusive of interest and penalties, for the period
from January 1, 2022 to March 31, 2025, asserting that GST/HST should apply to sales of hashpower by Hive Atlantic to Hive
Digital Data Ltd., again on the basis of an alleged permanent establishment in Canada. No Notice of Assessment has been issued in
respect of this proposed adjustment as of the date of this report. Hive Atlantic is disputing both matters.
Management has concluded that an unfavourable outcome in respect of these matters is reasonably possible but not probable.
Accordingly, no provision has been recorded in these financial statements. The Company and its subsidiaries will continue to
monitor developments and will record a provision if and when an outflow of resources becomes probable and reliably estimable.
Non-cash provision for regulatory liabilities
(a) VAT Liability to the Sweden Tax Agency ("STA")
The Company's wholly owned Swedish subsidiaries Bikupa Datacenter AB ("Bikupa") and Bikupa Datacenter 2 AB ("Bikupa 2")
have received a series of decision notices of assessment (the "decisions") from the Swedish Tax Agency (the "STA") concerning
the application of value added tax ("VAT") and, in particular, the entities' entitlement to recover input VAT on equipment and other
charges. Decisions were issued to Bikupa on December 28, 2022, December 21 and 22, 2023, May 28, 2024, October 14 and 16,
2024, March 17, 2025, September 23, 2025 and October 14, 2025, and to Bikupa 2 on February 14, 2023, June 14, 2023,
December 21, 2023, September 11 and 23, 2024, March 21, 2025, June 12, 2025, August 11, 2025, October 22, 2025, March 25,
2026, April 8, 2026 and April 27, 2026. The decisions reject recovery of input VAT for the periods assessed and require repayment
of amounts previously refunded, together with tax supplements and interest.
The Company appealed the initial Bikupa decision on February 9, 2023 and the initial Bikupa 2 decision on March 10, 2023, and
has appealed subsequent decisions as they have been issued. The Company engaged an independent legal firm and an independent
audit firm in Sweden with expertise in these matters to assist in the appeal process. Management, supported by its independent
advisors, continues to hold the view that the decisions are not compatible with applicable law or with the technical characteristics
of the Company's operations, and that under general principles governing the burden of proof it is for the STA to substantiate its
position. The Company's position is supported by European Union guidelines, a ruling of the Swedish Council for Advance Tax
Rulings, an information technology forensic expert opinion and a legal opinion from a Swedish professor of VAT law.
The matters proceeded through the Administrative Court and, subsequently, the Court of Appeal, which ruled against the Company.
On July 20, 2026 the Company filed applications for leave to appeal to the Supreme Administrative Court. The Company's
Swedish counsel has advised that the prospect of obtaining a favourable outcome before the Supreme Administrative Court is
remote.
24
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
16. Commitments and Contingencies (continued)
Contingencies (continued)
Notwithstanding management's continuing view of the merits and the Company's intention to pursue all available avenues of
appeal, the adverse judgments of the Court of Appeal and the related advice of the Company's Swedish counsel have caused
management to conclude that it is probable that a liability has been incurred and that the amount of that liability can be reasonably
estimated. Accordingly, during the quarter ended June 30, 2026 the Company recorded a provision of SEK 822.0 million
(approximately $84.7 million), translated at the June 30, 2026 closing rate of SEK $9.71 per United States dollar. The non-cash
charge is presented within operating expenses and the provision is classified as a current liability. In prior periods the Company
had concluded that the amounts claimed were not probable and no provision had been recorded.
The provision covers all VAT periods of Bikupa and Bikupa 2 through June 30, 2026. It includes SEK 769.6 million in respect of
periods for which the STA has issued a decision or suggested decision, being December 2020 to June 2025 for Bikupa and April
2021 to December 2025 for Bikupa 2, and SEK 52.4 million in respect of subsequent periods for which no decision has yet been
issued on the basis that those periods arise from the same facts and the same position taken by the STA as the periods already
determined.
The Company's exposure may exceed the amount provided. Interest continues to accrue on assessed amounts until settlement. The
Company is unable to estimate the amount of this additional exposure at this time.
Following resolution of the appeals, the Company may pursue claims against the STA and the Swedish State in respect of VAT
withheld, interest and related direct and indirect costs, and is evaluating whether interim relief may be available in respect of
amounts withheld without a final determination. Any recovery arising from such claims represents a change in provision; no asset
has been recognized and no amount has been offset against the provision.
The Company's Swedish subsidiary Bikupa Real Estate AB has a related exposure of SEK 17.3 million (approximately $1.7
million), comprising SEK 14.9 million of decisions and suggested decisions issued by the STA in respect of periods from January
2024 to April 2026 and SEK 2.5 million of input VAT claimed for May and June 2026 for which no decision has been issued. The
facts and the issue raised by the STA in respect of this entity differ from those in dispute for Bikupa and Bikupa 2, the entity was
not party to the Court of Appeal proceedings. Management has concluded that a loss in respect of this entity is reasonably possible
but not probable, and no provision has been recorded.
It is not yet known when these disputes will be finally resolved, and the process could extend well beyond one year. The industry
in which the Company operates continues to develop rapidly, and there can be no assurance that changes in the laws or policies of
Sweden will not further affect the Company's VAT position. The Company will reassess the provision at each reporting date for the
outcome of the leave applications, the status of deferral requests, decisions issued in respect of periods not yet assessed, and any
revised advice from its Swedish counsel.
- Related Party Transactions
The Company entered into the following related party transactions not otherwise disclosed in these consolidated financial statements:
(a) As at June 30, 2026, the Company had $0.4 million (March 31, 2026 - $0.1 million) due to a director and officers for the
reimbursement of expenses included in accounts payable and accrued liabilities.
(b) As at June 30, 2026, the Company had $nil (March 31, 2026 - $nil) due to a company controlled by a director of the Company
included in accounts payable and accrued liabilities. For the period ended June 30, 2026, the Company paid $51 (June 30, 2025 $82) to a company controlled by a director of the Company for marketing services.
Key Management Compensation
Key management personnel include those persons having authority and responsibility for planning, directing and controlling the
activities of the Company as a whole. The Company has determined that key management personnel consist of members of the
Company's Board of Directors and corporate officers.
For the period ended June 30, 2026, key management compensation includes salaries and wages paid to key management personnel
and directors of $0.6 million (period ended June 30, 2025 - $0.9 million) and share-based payments of $5.8 million (period ended June
30, 2025 - $4.7 million)
25
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
18. Equity
(a) Authorized
Unlimited common shares without par value
Unlimited preferred shares without par value
(b) Issued and fully paid common shares
During the period ended June 30, 2026, the Company:
On November 25, 2025, the Company entered into an equity distribution agreement ("November 2025 Equity Distribution
Agreement"). Under the November 2025 Equity Distribution Agreement, the Company may, from time to time, sell up to $300
million of common shares in the capital of the Company (the "November 2025 ATM Equity Program"). The Company issued
9,855,902 common shares (the "November 2025 ATM Shares") pursuant to the November 2025 ATM Equity Program for
gross proceeds of $31.1 million. The November 2025 ATM shares were sold at prevailing market prices, for an average price
per November 2025 ATM Share of $3.16 (C$4.37). Pursuant to the November 2025 Equity Distribution Agreement, a cash
commission of $0.9 million on the aggregate gross proceeds raised was paid to the Agents in connection with its services
under the November 2025 Equity Distribution Agreement. In addition, the Company incurred $156 thousand in fees related to
its November 2025 ATM Equity Program.
Issued 1,797,375 common shares upon the vesting of restricted share units (Note 19 (b)).
During the period ended June 30, 2025, the Company:
The Company issued 38,109,822 October 2024 ATM Shares pursuant to the October 2024 ATM Equity Program for gross
proceeds of $70 million. The October 2024 ATM shares were sold at prevailing market prices, for an average price per
October 2024 ATM Share of $1.84 (C$2.54). Pursuant to the October 2024 Equity Distribution Agreement, a cash commission
of $1.8 million on the aggregate gross proceeds raised was paid to the agent in connection with its services under the October
2024 Equity Distribution Agreement. In addition, the Company incurred $145 in fees related to its October 2024 ATM Equity
Program.
The Company issued 600,000 common shares for total proceeds of $738 pursuant to the exercise of 500,000 options at a price
of $1.25 per stock option and 100,000 options at a price of $1.10 per stock option.
Following is a summary of changes in warrants outstanding for the period ended June 30, 2026:
Warrants outstanding
Balance, March 31, 2024
Reclassified to warrant liability
Balance, March 31, 2025
Exercised
Balance, March 31, 2026
Exercised
Balance, June 30, 2026
5,243,727 $
(4,898,727)
345,000 $
(215,625)
129,375 $
129,375 $
Weighted average
exercise price
15.20
(15.91)
5.00
(5.00)
5.00
5.00
26
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
19. Stock-based Compensation
Stock-based compensation expense was comprised of the following for the periods ended:
June 30, 2026
Stock options
RSUs
Total
$
$
June 30, 2025
9 $
7,073
7,082 $
36
5,715
5,750
(a) Stock options
The Company has established a rolling Stock Option Plan (the "Plan"). Under the Plan, the number of shares reserved for issuance may
not exceed 10% of the total number of issued and outstanding shares and, to any one optionee, may not exceed 5% of the issued shares
on a yearly basis. The maximum term of each option shall not be greater than 10 years. The exercise price of each option shall not be
less than the market price of the Company's shares at the date of grant. Options granted to consultants performing investor relations
activities shall vest over a minimum of 12 months with no more than a quarter of such options vesting in any 3-month period. All other
options vest at the discretion of the Board of Directors. There were no options granted during the periods ended June 30, 2026 and June
30, 2025.
On April 1, 2024, the Company modified the exercise price from Canadian dollars to United States dollars of stock options that were
held by employees in the United States of America and in Europe. The modification resulted in $nil additional stock-based
compensation expense.
Following is a summary of changes in stock options outstanding with a CAD exercise price:
Outstanding
Weighted average
exercise price - CAD
Balance, March 31, 2024
Change in exercise price
3,465,915
(1,605,015)
5.24
(3.32)
Balance, March 31, 2025
Expired
Exercised
Balance, March 31, 2026 and June 2026
1,860,900 $
(2,000)
(75,100)
1,783,800 $
5.24
(15.70)
(5.98)
6.93
Following is a summary of changes in stock options outstanding with a USD exercise price:
Outstanding
Balance, March 31, 2025
Exercised
Balance, March 31, 2026 and June 2026
1,450,400 $
(600,000)
850,400 $
Weighted average
exercise price - USD
2.53
(1.21)
3.47
27
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
19. Stock-based Compensation (continued)
The stock options outstanding and exercisable with CAD exercise price as at June 30, 2026, are as follows:
Outstanding
282,400
50,000
450,000
400,000
100,000
200,000
20,000
1,400
60,000
180,000
40,000
1,783,800
Exercise price CAD
Exercisable
282,400 $
50,000
450,000
400,000
100,000
200,000
20,000
1,400
60,000
153,000
40,000
1,756,800
Expiry date
5.66
10.00
6.86
3.10
1.35
1.45
1.90
10.80
18.35
18.50
25.35
August 26, 2027
March 26, 2028
July 6, 2028
September 18, 2028
December 21, 2028
February 10, 2030
May 29, 2030
December 24, 2030
April 29, 2031
October 7, 2031
November 10, 2031
The stock options outstanding and exercisable with USD exercise price as at June 30, 2026, are as follows:
Outstanding
50,400
500,000
130,000
100,000
30,000
20,000
20,000
850,400
Exercisable
50,400 $
500,000
130,000
100,000
30,000
20,000
830,400
Exercise price USD
4.36
1.23
5.14
1.09
20.03
20.36
16.61
Expiry date
August 26, 2027
September 14, 2027
July 6, 2028
February 10, 2030
April 6, 2031
November 10, 2031
December 9, 2031
(b) Restricted share-units
The Company has established a Restricted Share Unit Plan (the "RSU Plan"). Under the RSU Plan, together with any other share
compensation arrangement, the number of shares reserved for issuance may not exceed 10% of the total number of issued and
outstanding shares and, to any one optionee, may not exceed 5% of the issued shares on a yearly basis. The Board may in its own
discretion, at any time, and from time to time, grant RSUs to any employee, director or consultant of the Company or its subsidiaries
(collectively, "Eligible Person"), other than persons conducting investor relations activities, from time to time by the Board, subject to
the limitations set forth in the RSU Plan. The Board may designate one or more performance periods under the RSU Plan. In respect of
each designated performance period and subject to the terms of the RSU Plan, the Board may from time to time establish the grant date
and grant to any Eligible Person one or more RSUs as the Board deems appropriate.
28
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
19. Stock-based Compensation (continued)
The fair value of restricted shares units (RSUs) is generally measured as the grant date price of the Company's shares.
On June 30, 2026, the Company granted 3,341,800 RSUs to certain employees, officers, directors and eligible consultants of the
Company with a fair value of C$5.18 per share and vesting on June 30, 2027.
Following is a summary of changes in restricted share units:
Outstanding
Balance, March 31, 2024
Granted
Exercised
Balance, March 31, 2025
$
Granted
Exercised
Balance, March 31, 2026
11,176,300
(3,125,950)
$ 15,152,762
Granted
Exercised
Balance, June 30, 2026
3,341,800
(1,797,375)
$ 16,697,187
$
1,379,056
6,050,000
(326,644)
7,102,412
- Loss per Share
Income per common share represents net income for the period divided by the weighted average number of common shares outstanding
during the period.
Diluted income per share is calculated by dividing the applicable net income by the sum of the weighted average number of common
shares outstanding and all additional common shares that would have been outstanding if potentially dilutive common shares had been
issued during the period.
Three-months ended
June 30, 2026
June 30, 2025
Basic weighted average number of common shares outstanding
Effect of dilutive stock options and warrants
Diluted weighted average common shares outstanding
266,251,300
266,251,300
182,007,767
10,819,412
192,827,179
29
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
21. Finance Expense
Finance expenses were comprised of the following for the periods ended:
Three-months ended
June 30, 2026 June 30, 2025
Interest and accretion on convertible loan
Interest on loans payable
Interest on term loan
Interest on lease liabilities - finance lease
Interest on mortgage payable
Total
$
$
211 $
192
23
667
243
1,336 $
169
72
47
288
- General and Administrative Expenses
General and administrative expenses were comprised of the following for the periods ended:
Three-months ended
June 30, 2026 June 30, 2025
Management fees, salaries and wages
Marketing
Office, administration and regulatory
Professional fees, advisory and consulting
Total
$
$
923 $
611
5,032
2,455
9,021 $
1,515
514
1,565
2,156
5,750
- Operating and Maintenance Costs
Operating and maintenance costs were comprised of the following for the periods ended:
Three-months ended
June 30, 2026 June 30, 2025
Digital currency mining*
High performance computing hosting
Total
$
$
51,000 $
2,877
53,877 $
26,843
2,140
28,983
- Supplemental Cash Flow Information
Three-months ended
June 30, 2026 June 30, 2025
Non-cash transactions:
Equipment deposits or purchases paid with bitcoin
Recognition of ROU assets and lease liabilities
$
$
5,017 $
69,260 $
286
Interest paid
Income taxes paid
$
$
387 $
2,976 $
232
187
30
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
25. Fair Value Measurements
The fair values of investments were measured using the net asset value or a market approach. The investments measured at fair value
are classified into one of the three levels in the fair value hierarchy according to the relative reliability of the inputs used to estimate the
fair values, with the designation based upon the lowest level of input that is significant to the fair value measurement. The three levels
of the fair value hierarchy are:
Level 1 Inputs: Quoted prices (unadjusted) in active markets for identical assets or liabilities that the entity can access at the
measurement date.
Level 2 Inputs: Quoted prices for similar assets or liabilities in active markets, or quoted prices for identical or similar assets or
liabilities in markets that are not active, or other observable inputs other than quoted prices.
Level 3 Inputs: Unobservable inputs for the asset or liability (Unobservable inputs reflect management's assumptions on how market
participants would price the asset or liability based on the information available).
Valuation of Assets that use Level 2 Inputs ("Level 2 Assets"). The fair value of Level 2 Assets would use the quoted price from the
exchanges which the Company most frequently uses, with no adjustment.
At the year end the Company classified its financial assets into the following levels:
Assets
Cash
(i) Digital currencies (Note 6)
(ii) Investments (Note 4)
Derivative asset (Note 10)
Liabilities
Warrant liability
As at June 30, 2026
Level 1
Level 2
Level 3
$
- $ 208,039 $
11,248
7,637
3,221
30,994
18,885 $ 239,033 $
3,221
$
As at March 31, 2026
Level 1
Level 2
Level 3
$
- $
23,113 $
10,822
6,624
3,117
606
17,446 $
23,719 $
3,117
$
$
$
$
$
$
$
$
$
2,154
2,154
$
$
$
$
413
413
(i) The fair value of the Company's digital assets are determined by the price at 12:00 AM CET per coinbase.com.
(ii) The Company's investments classified as level 3 fair value measurements consist of investments in preferred stock, convertible
notes and common stock. For the Company's common stock investments:
Various Black Scholes models were utilized; and
A prior transaction approach was used for others; some adjusted.
A verified prior transaction is initially given 100% weighting in a fair value conclusion (if completed at arm's length), but subsequently
such weighting is adjusted based on the merits of newly observed data. As a result, in the absence of disconfirming data, an unadjusted
prior transaction price may not be considered "stale" for months or, in some cases, years.
31
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
25. Fair Value Measurements (continued)
Level 3 Continuity
The following is a reconciliation of Level 3 assets and liabilities:
Fair value at
June 30, 2026
Level 3 Continuity
Investments
Balance, at April 1
Additions
Transfer to Level 1
Foreign exchange
Change in fair value
Balance, at June 30
$
$
Warrant liability
Balance, at April 1
Change in fair value
Balance, at June 30
$
$
Fair value at
March 31, 2026
3,117 $
(4)
108
3,221 $
3,120
725
(725)
6
(9)
3,117
413 $
1,741
2,154 $
760
(347)
413
In addition to assets and liabilities that are measured at fair value on a recurring basis, the Company also measures certain assets and
liabilities at fair value on a non-recurring basis. The Company's long-lived assets, including intangible assets, operating lease right-ofuse assets, and property, plant and equipment, are measured at fair value when there is an indication of impairment and the carrying
amount exceeds the asset's projected undiscounted cash flows.
These assets are measured at fair value only when an impairment loss is recognized. The carrying amounts of cash, amounts receivable,
net, other receivables, and accounts payable and accrued expenses are a reasonable approximation of their fair value due to their shortterm maturity or they are valued using the income approach valuation technique.
- Digital Currency and Risk Management
Digital currencies are measured using Level 1 inputs.
Digital currency prices are affected by various forces including global supply and demand, interest rates, exchange rates, inflation or
deflation and the global political and economic conditions. The profitability of the Company is directly related to the current and future
market price of coins; in addition, the Company may not be able liquidate its inventory of digital currency at its desired price if
required. A decline in the market prices for coins could negatively impact the Company's future operations. The Company has not
hedged the conversion of any of its coin sales or future mining of digital currencies.
Digital currencies have a limited history and the fair value historically has been very volatile. Historical performance of digital
currencies is not indicative of their future price performance. The Company's digital currencies currently mainly consist of Bitcoin.
The table below shows the impact for every 5% variance in the price of Bitcoin on the Company's earnings before tax, based on the
closing price at June 30, 2026.
Bitcoin
Impact of 5%
variance in price
$
553
For the security of its digital currencies, the Company uses the services of two institutions through custodial agreements, one located in
Liechtenstein and another in the United States.
32
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
27. Segmented Information
The Company's CODM is its President and CEO. The Company operates in one segment, with two revenue streams being the mining
and sale of digital currencies and high-performance computing hosting. The Company uses net income as measures of profit or loss on
a consolidated basis in making decisions regarding resource allocation and performance assessment. Additionally, the Company's
CODM regularly reviews the Company's expenses on a consolidated basis. The financial metrics used by the CODM help make key
operating decisions, such as determination of digital asset purchases and significant acquisitions and allocation of budget between cost
of revenue and general and administrative expenses.
External revenues are attributed by geographical location, based on the country from which services are provided.
Three months ended June 30, 2026
Revenue from digital currency
mining
High performance computing
hosting
Canada
Paraguay
Iceland
Switzerland
Bermuda
Total
$
72,060 $
72,060
$
7,060
7,060 $
72,060 $
7,060
79,120
Three months ended June 30, 2025
Revenue from digital currency
mining
High performance computing
hosting
Sweden
Canada
Sweden
Paraguay
Iceland
Switzerland
Bermuda
Total
$
40,797 $
40,797
$
4,814
45,611 $
4,814
45,611
33
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
27. Segmented Information (continued)
The Company's plant and equipment are located in the following jurisdictions:
June 30, 2026
Plant and equipment
ROU asset
Canada
$
$
March 31, 2026
Plant and equipment
ROU asset
116,947
105,689
222,636
Sweden
$
$
Canada
$
$
113,646
41,954
155,600
11,661
604
12,265
Paraguay
$
$
Sweden
$
$
14,076
1,012
15,088
324,546
324,546
Iceland
$
$
$
352,754
352,754
$
Paraguay
Switzerland
$
$
Iceland
$
$
Bermuda
$
$
Switzerland
$
$
118
118
Total
$
$
Bermuda
$
$
130
130
453,154
106,411
559,565
Total
$
$
480,476
43,096
523,572
34
HIVE Digital Technologies Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the three months ended June 30, 2026 and 2025
(expressed in thousands of United States dollars unless otherwise noted and share amounts)
(Unaudited)
28. Comparative Figures
Certain figures in the comparative period condensed interim consolidated statements of financial position, condensed
interim consolidated statements of loss and comprehensive loss, condensed interim consolidated statements of changes in equity and
condensed interim consolidated statements of cash flows have been reclassified to meet the current presentation.
- Subsequent Events
Subsequent to the period ended June 30, 2026, the Company issued 1,273,625 common shares under the RSU plan upon the exercise of
restricted share units.
Subsequent to the period ended June 30, 2026, the Company issued 2,002,330 November 2025 ATM Shares pursuant to the November
2025 ATM Equity Program for gross proceeds of $6.3 million. The November 2025 ATM shares were sold at prevailing market prices
for an average price per November 2025 ATM Share of $3.13 (C$4.41). Pursuant to the November 2025 Equity Distribution
Agreement, a cash commission of $0.2 million on the aggregate gross proceeds raised was paid to the Agents in connection with its
services under the November 2025 Equity Distribution Agreement.
On July 17, 2026 the Company’s wholly-owned subsidiary Buzz Beta Cloud Inc., entered into a binding purchase agreement for the
acquisition of equipment and related services totalling $186.9 million. Under the terms of the agreement a 10% non-refundable deposit
was required to secure the order, and on July 24, 2026, the Company paid the required deposit of approximately $18.7 million. A
further 15% is payable upon notification that the OEM has received the required components, with the remaining 75% due prior to
shipment. The Company intends to fund the remaining balance from existing cash resources and available financing sources.
35
Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations
The following management’s discussion and analysis of our financial condition and results of operations (the “MD&A”) should be read
together with our Unaudited Condensed Consolidated Financial Statements and the related notes and the other financial information
included elsewhere in this Quarterly Report and in our Audited Consolidated Financial Statements included in our Annual Report on
Form 10-K for the fiscal year ended March 31, 2026 (the "Annual Report"). This discussion contains forward-looking statements that
involve risks and uncertainties. Our actual business, financial condition, and results of operations could differ materially from those
anticipated in these forward-looking statements as a result of various factors, including those discussed below and elsewhere in this
Quarterly Report and in the Annual Report, particularly under “Item 1A. Risk Factors.” See also “Cautionary Statement Regarding
Forward-Looking Statements.” Our historical results are not necessarily indicative of the results that may be expected for any period in
the future.
These documents and additional information regarding the business of the Company are available on the System for Electronic Data
Analysis and Retrieval ("SEDAR+") at www.sedarplus.ca, the Electronic Data Gathering, Analysis and Retrieval ("EDGAR") system
maintained by the Securities and Exchange Commission (the "SEC") at www.sec.gov/EDGAR and the Company's website at
www.hivedigitaltechnologies.com. For the year ended March 31, 2025, the Company transitioned its financial reporting framework
from International Financial Reporting Standards ("IFRS") to the generally accepted accounting principles in the United States of
America ("US GAAP"). The preparation of financial data is in accordance with US GAAP as issued by the Financial Accounting
Standards Board ("FASB") and all figures are reported in United States dollars unless otherwise indicated.
This Management's Discussion & Analysis contains information up to and including August 14, 2026.
Our MD&A is primarily organized as follows:
Business Overview, Trends, Business Objectives and Operational Milestones. Highlights of events that impacted our financial
position and results of operations.
Results of Operations. Analysis of our financial results comparing the three months ended June 30, 2026 and 2025.
Liquidity and Capital Resources. Analysis of changes in our balance sheets and cash flows and discussion of our financial
condition, including potential sources of liquidity, material cash requirements, and their general purpose.
Critical Accounting Policies and Estimates. Accounting policies and estimates that we believe are important to understanding
the assumptions and judgments underlying our reported financial results.
6
BUSINESS OVERVIEW, TRENDS, BUSINESS OBJECTIVES AND OPERATIONAL MILESTONES
Business Overview
HIVE Digital Technologies Ltd. is a sustainable-energy focused digital infrastructure company. Our business model consists of using
cash-flow generated from our established hashrate services business to support our ongoing AI and HPC business expansion that is
primarily being undertaken through our subsidiary, BUZZ High Performance Computing Inc. ("BUZZ" or "BUZZ HPC"). The
Company leverages its existing footprint of Tier-I data centers, initially optimized for energy-efficient hashrate services, to secure lowcost power, grid access, and operational scale, then incrementally upgrades these assets to Tier-III, enterprise-grade AI infrastructure
capable of supporting high-density GPU workloads, liquid cooling, and mission-critical uptime. Through BUZZ HPC, HIVE is
positioning itself as a sovereign AI provider, offering domestically controlled, regulation-aligned compute infrastructure tailored to
governments, enterprises, and research institutions, particularly in Canada. Our geographic strategy focuses on energy-advantaged
regions such as Canada, Sweden, and Paraguay, where abundant, low-cost renewable power enables both immediate monetization and
long-term scalability. By converting energy access into increasingly valuable compute capacity, HIVE is transitioning from a traditional
hashrate service provider into a vertically integrated, capital-efficient AI infrastructure platform aligned with global trends in AI
demand, data localization, and power-constrained data center development.
The Company is a reporting issuer in each of the Provinces and Territories of Canada and under the Securities Exchange Act of 1934 in
the United States. The Company's common shares are listed for trading on the Toronto Stock Exchange and the Nasdaq Capital Markets
Exchange under the symbol "HIVE" and on the Colombian Stock Exchange under the symbol "HIVECO".
HIVE operates "green" energy-powered data center facilities in Canada, Sweden, and Paraguay. Our references to "green" energy are
to our energy supply agreements with producers of hydroelectric power in Canada, Sweden and Paraguay, and previously, hosting
agreements with suppliers in Iceland where the hosting facilities were powered by hydroelectric or geothermal power. One of our key
objectives in locating our facilities where they are is to avoid or minimise using energy derived from fossil fuels. Our facilities are
connected to local power grids that are controlled by local authorities. As a result, we do not control the sourcing of our power, which
may include energy from any source on the grid. However, the close proximity of our facilities to hydroelectric based power
generating plants, makes it highly probable that a significant portion of the power that we use for our data centers originates from those
hydroelectric plants, which is the basis for our saying that our operations are "green."
Our Portfolio
The following table summarizes the operational hashrate of each of the Company's major data centers together with its average
operational power consumption and power capacity available to each such data center, as of July 31, 2026. As of July 31, 2026, the
Company's total installed hashrate was approximately 25.2 EH/s with an implied efficiency of 16.5 J/TH, based on the nameplate
hashrate and power consumption of the installed miners. Where miners were operating in a modified operating mode, including
through controlled downclocking for fleet optimization, the figures reflect the expected hashrate and power consumption associated
with such modified operating mode. After accounting for these adjustments, the Company's installed hashrate was approximately 24.5
EH/s, with an implied fleet efficiency of 16.1 J/TH.
Operational
Hashrate
Sites
New Brunswick, Canada owned facility 2
Quebec, Canada leased facility
Boden, Sweden leased facility
Boden 2, Sweden owned facility
Notviken, Sweden leased facility
2,118 PH/s
1,318 PH/s
1,158 PH/s
0 PH/s
33 PH/s
Installed
Hashrate Optimized 3
2,464 PH/s
1,513 PH/s
1,609 PH/s
0 PH/s
36 PH/s
7
Installed
Hashrate Stock 4
3,115 PH/s
1,525 PH/s
1,680 PH/s
0 PH/s
52 PH/s
MW Utilized
MW Capacity
Available
36.5 MW
29.8 MW
19.6 MW
0.0 MW
0.7 MW
70.0 MW
34.5 MW
32.0 MW
7.0 MW
1.5 MW
Operational
Hashrate
Sites
Yguazu, Paraguay owned facility
Valenzuela, Paraguay owned facility
Toronto, Canada owned facility
Quebec City, Canada hosted facility 1
Montreal, Canada hosted facility 1
Stockholm, Sweden hosted facility 1
Manitoba, Canada hosted facility 1
Total
Installed
Hashrate Stock 4
12,133 PH/s
6,667 PH/s
71 PH/s
N/A
MW Utilized
MW Capacity
Available
11,995 PH/s
6,907 PH/s
65 PH/s
N/A
Installed
Hashrate Optimized 3
12,125 PH/s
6,705 PH/s
66 PH/s
N/A
195.2 MW
106.7 MW
1.0 MW
0.7 MW
200.0 MW
107.0 MW
5.5 MW
0.7 MW
N/A
N/A
N/A
23,594 PH/s
N/A
N/A
N/A
24,518 PH/s
N/A
N/A
N/A
25,243 PH/s
1.4 MW
0.4 MW
1.0 MW
393.1 MW
1.4 MW
0.4 MW
4.0 MW
464.0 MW
1 Data center used for HPC / AI compute only.
2 Includes approximately 115 PH/s of BTC equivalent hashrate.
3 Installed Hashrate - Optimized: The hashrate of all installed ASICs based on their current operating configuration, whether stock
settings or a modified operating mode.
4 Installed Hashrate - Stock: The hashrate of all installed ASICs based on their stock configuration.
Currently, the majority of our data center power is being utilized by HIVE to generate hashrate which is sold to mining pools who then
utilize the hashrate for the mining of Bitcoin. The mining pools acquire the hashrate from HIVE based on an FPPS payout model. We
retain our Bitcoin in segregated, secure storage wallets with Fireblocks Inc. ("Fireblocks") and Bank Frick, third-party providers that
specialize in secure crypto storage. We have not collateralized our Bitcoin assets against debt or other obligations of any kind. Our
Bitcoin is not stored on any exchange. Our Bitcoin is never "staked" for mining purposes or loaned to any third party.
The Company recognizes the majority of its revenue from the provision of hashrate services, where the Company generates hashrate
and sells said hashrate to mining pools which utilise the hashrate for their purposes while paying out HIVE based on an FPPS payout
model for which the Company receives digital currencies and records them at their fair value on the date received. The Company's
revenue is being diversified through our expansion into Tier-III data center operations, which support HPC and AI based applications.
Financial Summary
Three months ended June 30,
2026
2025
(in thousands, except share amounts)
Total revenue
Net (loss) income
Gross operating margin (1)
$
79,120 $
(142,907)
24,188
45,611
35,016
15,819
Basic (loss) income per share
$
(0.54) $
0.19
1,004
406
Digital assets mined - BTC
Non-GAAP measure. A reconciliation to its nearest GAAP measures is provided under "Reconciliations of Non-GAAP Financial
Performance Measures" below.
Highlights
On April 21, 2026, the Company’s wholly-owned subsidiary, HIVE Bermuda 2026 Ltd., completed an offering (the “April Note
Offering”) of $115 million aggregate principal amount of exchangeable senior notes (the “April Notes”) which included the full
exercise of the initial purchasers’ option to purchase an additional $15 million of Notes. Net proceeds were $109.8 million after
deducting commissions and expenses. In connection with the April Note Offering, HIVE entered into capped call transactions with
certain financial institutions, designed to mitigate economic dilution or excess cash outlay upon exchange of the Notes above the
exchange price up to the cap price. The capped call transactions were funded using approximately $19.8 million cash on hand.
On June 30, 2026, HIVE Bermuda 2026 Ltd. completed an offering (the “June Note Offering”) of $130 million aggregate principal
amount of exchangeable senior notes (the “June Notes”) which included the full exercise of the initial purchasers’ option to purchase an
additional $15 million of June Notes. Net proceeds were $124.9 million after deducting commissions and expenses. In connection with
the June Note Offering, HIVE entered into capped call transactions with certain financial institutions, designed to mitigate economic
dilution or excess cash outlay upon exchange of the Notes above the exchange price up to the cap price. The capped call transactions
were funded using approximately $15.7 million cash on hand.
8
Digital currency operations
The Bitcoin protocol is such that following every 210,000 blocks that are mined, the mining rewards are reduced by 50 percent (a
"Halving"). The most recent Halving occurred on April 20, 2024, with the block rewards reduced from 6.25 Bitcoin to 3.125 Bitcoin.
The Company continues to make opportunistic investments to upgrade its ASICs and infrastructure, improve fleet efficiency and
maximise hashrate.
On December 3, 2024, the Company announced the purchase of 13,480 Bitmain S21+ Hydro units, together with a purchase option for
an additional 13,480 units, representing approximately a combined total of 8.6 EH/s capacity. The Company subsequently exercised
this option, with approximately 7,420 units shipped to the Yguazú Facility and the remaining 6,060 units scheduled for shipment to the
Valenzuela Facility in September 2025.
In March 2025, the Company purchased 16,560 Bitmain S21+ Antminers (~3.57 EH/s) delivered to the Yguazú Facility and
subsequently exercised a purchase option for 15,000 additional Bitmain S21+ Hydro units (~4.78 EH/s) delivered to the Valenzuela
Facility.
On March 17, 2025, the Company closed the acquisition of the 200 MW hydroelectric facility in Yguazú, Paraguay. Phase 1 (~6 EH/s)
commenced operations in early April 2025. The site was fully energized by mid-May 2025. Phase 2 (~6.5 EH/s) was completed in early
September 2025. Phase 3 at the Valenzuela facility (100 MW, ~6.5 EH/s) was completed on November 10, 2025, two weeks ahead of
schedule, bringing total installed hashrate to approximately 25 EH/s with overall fleet efficiency of approximately 17.5 J/TH.
On October 5, 2025, the Company executed a cashless exercise of its call option on its prior Bitcoin payment on equipment purchases
and repurchased 86.5341 Bitcoin at the strike price of $86,962 at a time when the market price was $123,502 resulting in a credit of
$3.2 million that was used towards 723 Bitmain S21 XP Antminers that were ordered to replace some older generation ASICs.
On October 21, 2025, the Company announced it signed a definitive agreement to develop an additional 100 MW hydroelectricpowered data center campus at its Yguazú site in Paraguay. This expansion will increase HIVE's total renewable power capacity in
Paraguay to 400 MW.
On December 14, 2025, the Company executed a cashless exercise of its call option on its prior Bitcoin payment on equipment
purchases and repurchased 287.0313 Bitcoin at the strike price of $86,962 at a time when market price was $93,145 resulting in a credit
of $1.8 million that was used towards the Bitmain S21 XP Antminers announced on December 30, 2025.
On December 30, 2025, the Company entered into an agreement to purchase 8,000 Bitmain S21 XP Antminers to upgrade some oldergeneration equipment across its data center portfolio. In addition, the Company entered into an agreement that will allow it to execute a
cashless exercise of its call option on its prior Bitcoin payment on equipment purchases for 318.1019 Bitcoin at the strike price of
$86,962 at a deemed market price of $110,000 resulting in a credit of $7.3 million that is to be applied towards the purchase of these
Bitmain S21 XP Antminers.
The Bitmain S21 XP Antminers were expected to ship between January 2026 and March 2026. Each S21 XP unit has an average
hashrate of approximately 270 TH/s, representing an aggregate nameplate capacity of approximately 2.16 EH/s. As these units are
intended to replace existing lower-efficiency machines, the net expected increase in hashrate is approximately 1.30 ExaHash. As at
March 31, 2026, the Company paid for and received delivery of 5,334 units from this order.
In January 2026, the Company sublet its lease agreement for its 4 MW facility in Robertsfors, Sweden through August 18, 2026, and
disposed of the legacy ASIC equipment for nominal value, consistent with the Company's strategy of concentrating capital in its
lowest-cost facilities.
9
These developments are central to our strategic commitment to fostering scalable, energy-efficient operations in regions that offer lowcost energy advantages. Management believes these advancements will drive significant value for our investors as we continue to
optimize our operations and expand our presence in the ASIC landscape.
High-performance computing operations
The Company has continued to develop and expand its HPC business, which draws on the Company's fleet of GPUs in enterprise grade
data center servers operating in Tier-III data centers. These GPUs operate with redundancy and are utilized for rental through GPU ondemand marketplaces and term contracts, where end users are typically performing Large Language Model ("LLM") computations,
such as modeling, inference and fine-tuning. Currently, the Company collectively has approximately 5,000 GPUs operating across TierIII data centers in Montreal, Canada and Stockholm Sweden, which include NVIDIA A5000, A6000, A40, H100 and H200 GPUs.
On November 17, 2025, the Company announced the purchase of 504 Nvidia Blackwell B200 GPUs installed in 63 Dell XE9680L
servers with InfiniBand, representing HIVE's first deployment of next-generation AI-optimized liquid-cooled GPUs, slated for the Bell
Canada AI Fabric data center in Manitoba, Canada.
On January 13, 2026, the Company announced its expansion into AI cloud services in Paraguay through a strategic joint venture with
Paraguay's leading telecommunications operator. Through this partnership, HIVE launched one of the first purpose-built AI BUZZ
Cloud platforms in Paraguay, located in Asunción and hosted within a Tier-III data center. The platform is designed to deliver HPC and
AI infrastructure to serve academic institutions, enterprises, financial services firms, and healthcare providers across Paraguay and the
broader South American region. The initial enterprise-grade GPU cluster deployment commenced in calendar Q1 2026.
On February 13, 2026, BUZZ signed customer agreements representing approximately $30 million in total contract value over twoyear fixed terms for the 504 liquid-cooled Dell server-based Nvidia B200 GPUs at the Bell Canada AI Fabric data center in Manitoba.
Originally expected to come online in the quarter ending March 31, 2026, the units became operational in May 2026. Based on
executed contracts, current pricing, and deployment milestones, management expects this initial phase to generate approximately $15
million in projected annual recurring revenue (“ARR”) for BUZZ's cloud business once fully operational, lifting total annualized HPC
segment revenue from approximately $20 million to approximately $35 million.
The term "ARR" refers to the Company's run rate revenue calculated on an annualized basis. As context dictates, the Company
calculates ARR by: (i) multiplying the revenue realized per week times 52 weeks per year, (ii) multiplying the realized revenue per day
times 365 days per year, or (iii) multiplying the per quarter data times four quarters per year. Projections of ARR may be unreliable as a
predictor of future results because such projections typically do not incorporate the possibility of subsequent cancellations, discounts or
downgrades in services. We believe that ARR is a key indicator of our future revenue potential. However, ARR does not represent
GAAP revenue on an annualized basis, is not intended to be a replacement or forecast of GAAP revenue and should be viewed
independently as an operating metric.
On March 16, 2026, BUZZ announced a 4x expansion of its liquid-cooled Canadian AI data center capacity through its strategic data
center partner Bell Canada AI Fabric. This expansion represents growth from 4 MW in Manitoba to 16.6 MW of critical IT load across
two Provinces of Canada as follows:
•
•
•
Manitoba (existing): 1 MW of critical IT load. BUZZ has deployed 504 next-generation AI-optimized GPUs (~1 MW
consumed), with 3 MW of remaining optional capacity supporting approximately 1,500 additional GPUs.
British Columbia - Phase 1 (new): 5 MW of critical IT load, available immediately, supporting deployment of approximately
2,000 next-generation high-power-density AI-optimized GPUs.
British Columbia - Phase 2 (option): An additional 7.6 MW in 2027, supporting approximately 3,000 additional GPUs.
The Company's New Brunswick 70 MW site has been identified by management as a candidate for conversion to Tier-III hyperscaler
co-location (estimated $85 million ARR), and the 7.2 MW Toronto Airport site is viewed as attractive for potential government or
military applications. Design development and site planning at New Brunswick are advancing.
On May 8, 2026, the Company announced that BUZZ contracted a fiber optic network overbuild and carrier transport upgrade at its
Grand Falls Data Centre in New Brunswick (the "Grand Falls Network Upgrade"), a step intended to advance the site to a Tier III HPCenabled data center. The Grand Falls Network Upgrade, undertaken in partnership with a Canadian carrier, contemplates multiple
dedicated 100 Gbps and 400 Gbps wavelength connections with delivery expected to begin in the third quarter of 2026. The Company's
estimated capital commitment is approximately $3.1 million over five years.
10
On May 18, 2026, the Company announced that BUZZ is advancing an approximately 320 MW AI infrastructure facility (the "GTA
Gigafactory") in the Greater Toronto Area, designed to support more than 100,000 GPUs at full build-out with an estimated capital
investment of approximately CAD $3.5 billion.
On June 18, 2026, the Company announced that BUZZ entered into an agreement with Bell Canada (“Bell”) and Cohere Inc.
(“Cohere”) for the construction and implementation of Canadian sovereign AI infrastructure (the “BUZZ Agreement”). The Buzz
Agreement contemplates that BUZZ will deploy a sovereign AI cloud and GPU cluster infrastructure at Bell's purpose-built facility in
Merritt, British Columbia. The deployment is intended to provide a high-performance compute layer on which Cohere will operate its
foundation models and enterprise AI solutions for government and corporate customers across Canada.
On June 18, 2026, the Company announced that the Boden Municipal Council in Boden, Sweden had approved the Company's
acquisition of the Company's leased facility known as the “Big Boden 32 MW data center” from Bodens Utvecklings AB (the “Boden
Acquisition”). The Big Boden facility has anchored HIVE's Swedish operations since 2018. The Company intends to advance the Big
Boden data center toward Tier III infrastructure standards. The Boden Acquisition remains subject to customary closing conditions.
On June 25, 2026, the Company announced that it had signed a co-location letter of intent (the “Boden LOI”) with a Swedish
technology company for a lease the Company's 32 MW facility located in Boden, Sweden. The Boden LOI contemplates a term of up
to 10 years for a usable critical IT load of approximately 25 MW. The Boden LOI is non-binding and subject to the negotiation and
execution of a definitive agreement.
Trends, Uncertainties and Other Factors Impacting our Business and Industry
Energy Risks
Following the invasion of Ukraine by Russia, many countries have implemented aggressive tax policies, strategic reserves, and
industrial incentives to protect their domestic energy supply. Management believes that the sharp rise in energy prices in Europe
underscores the vulnerability of unhedged power consumers, particularly in energy-intensive industries while the geopolitical energy
shock reinforces the strategic value of operating data centers in diverse locations. We believe a combination of energy scarcity and
strong demand for AI-driven compute capacity imply that stable, low-cost renewable energy represents a critical competitive advantage
in both digital asset mining and AI infrastructure services.
The Company has made best efforts to mitigate its exposure to high or unstable energy prices in Europe. Notwithstanding those efforts,
there is no assurance that this risk can be mitigated. With respect to the Company's operations in Sweden, the increased energy prices
across Europe resulting from the Russian invasion of Ukraine and other global events have been buffered partially by the Company
having forward energy agreements for the purchase of electricity. These energy hedging contracts allow HIVE to purchase a fixed
quantity of power measured in MW, for a fixed period of time. As a result, if the index spot price increases, HIVE can rely on a
previously agreed upon fixed energy price to continue operations uninterrupted.
HIVE actively monitors the hashrate economics of its operations to determine earnings from digital asset mining measured in dollars
per megawatt-hour ("MWHR"). Under certain market conditions, it may be more profitable for HIVE to sell its energy rights back to
the grid-as the Company would receive the proceeds of energy sold at index spot pricing, while paying the lower fixed price secured
under the energy hedged contract-than to provide hash power services. This energy optimization strategy not only protects profitability
but also demonstrates HIVE's operational flexibility in a volatile energy environment.
11
Our owned and leased Swedish data centers provide capacity of approximately 41.3 MW of renewable hydroelectric energy, which
represents approximately 9% of our total global hydroelectric capacity. These facilities are strategically positioned to benefit from
Sweden's robust renewable energy infrastructure and to support both hashrate services and emerging AI workloads. In an era when
energy security is increasingly linked to national policy and the compute economy is rapidly expanding, management believes that
HIVE's combination of stable renewable power and advanced data center infrastructure positions the Company to thrive across multiple
high-growth digital sectors.
Governmental and regulatory actions affecting power or electricity supply to data center operators could also limit the availability of, or
increase the costs we incur for, electricity in certain markets. For example, Hydro-Québec, the Province's public utility, has recently
proposed electricity tariffs that, if approved by the Régie de l'énergie and enacted, could significantly increase our power costs in the
Province, which, in turn, could negatively affect our Quebec operations. We continue to monitor developments, and where appropriate,
participate in regulatory proceedings to oppose government actions that we believe improperly target the industries in which we
operate.
Market Value of Bitcoin
We derive our revenues primarily from providing ASIC compute to bitcoin mining pool operators. We earn Bitcoin in exchange for
computational power used for hashing calculations from mining pool operators. Because our compensation is paid in Bitcoin, our
operating and financial results are tied to fluctuations in the value of Bitcoin.
There is also a risk that the Company could be negatively affected by Bitcoin halving events. Halving is a process designed to control
the overall supply and reduce the risk of inflation in Bitcoin. At a predetermined block, the mining reward is reduced by 50 percent.
The Bitcoin blockchain has undergone four Halvings since its inception. Most recently, in April 2024, the Bitcoin Block Reward
decreased from 6.25 Bitcoin to 3.125 Bitcoin per block and, consequently, the number of new Bitcoin issued to companies as a reward
or "subsidy" decreased from 900 per day to 450 per day, excluding transaction fees. The period of market normalization after the
Bitcoin Halving to incentivizing profitability levels is unknown. A Bitcoin Halving is scheduled to occur once every 210,000 blocks,
or roughly every four years, until the total amount of Bitcoin rewards issued reaches 21 million, which is expected to occur around the
calendar year 2140. The next Bitcoin Halving is expected to occur in April 2028. As the rewards for each Bitcoin mined is reduced,
the Bitcoin we earn relative to our hashrate capacity decreases. As a result, these adjustments have had, and are expected to continue to
have, material effects on our operating and financial results.
For a discussion of other factors that could lead to material adverse changes in the market value of Bitcoin, which could in turn result in
substantial damage to or even the failure of our Bitcoin business, see "Item 1A. Risk Factors-Risks Related to Cryptocurrency" in our
Annual Report.
Tax and Regulatory Environment for Digital Infrastructure Operations
As outlined below, the Company's subsidiaries have significant potential tax exposure under claims in Sweden and Canada. We are
constantly monitoring and assessing the probable outcomes based on the appeals process and advice from by consultants used in this
process. We may not prevail in one or more of the pending appeals and proceedings described herein.
The application of existing tax laws to blockchain-based digital infrastructure, including hashrate services and HPC data centers,
remains subject to evolving administrative interpretations and enforcement in certain jurisdictions. Where statutory frameworks predate
these technologies, tax authorities may apply legacy provisions through reassessments, audits, and litigation rather than existing tax
law, creating uncertainty. Tier-I data centers are designed for versatile, high-density computing and support a wide range of workloads,
including cloud services, data storage, rendering, AI preparation, and as well as hashrate based compute which may fall into a different
category of service under some regulatory interpretations. In particular, jurisdictions with statutory provisions for input VAT recovery
(rebates/refunds) and depreciation/capital allowances may apply differently, based on infrastructure characteristics or specific workload
type. We believe that in some cases, as outlined below, these characterizations warrant further review.
In Sweden, the Swedish Tax Authority (Skatteverket or "STA") has issued reassessments and decisions affecting value VAT eligibility,
input VAT recovery, and the classification of computing activities at Tier-I data centers engaged in the provision of hashrate compute
exported and sold to foreign companies and ultimately then sold to Bitcoin mining pools. These positions provide differentiated
treatment based on computational workload, denying or limiting VAT recovery and related benefits to mining operations that may
otherwise be available for comparable high-performance or data-processing activities-despite the absence of any express statutory
differentiation by workload.
Industry participants, including the Company's Swedish subsidiaries, have faced retrospective reassessments, denial of VAT refunds,
and ongoing administrative and court proceedings (with appeals pursued up to higher courts where appropriate). The Company
maintains that its positions align with enacted Swedish tax law and has appealed adverse decisions where appropriate. As discussed
herein, the Company's ability to claim VAT input recovery remains conditional on favorable rulings. If the Company and or its
subsidiaries are mandated by the STA to settle existing assessments following exhausting the appeals process across Sweden and the
European jurisdictions, and other tax strategies. The Company’s assets on hand at the Swedish locations may be subject to regulatory
actions such as seizure and or liquidation.
In addition, the Company may have to re-deploy capital away from projects currently in progress to satisfy any obligations that may be
imposed by the STA. The Company is currently assessing the risks and monitoring potential outcomes.
As announced by the Company in its news release on March 16, 2026, the Company is winding down its ASIC-based hashrate service
operations in Sweden as it reallocates capital toward the expansion of its AI and high-performance computing ("HPC") business. This
transition is consistent with the Company's previously announced investment in expanding BUZZ HPC's liquid-cooled AI data center
capacity and reflects management's strategy to prioritize capital allocation to enterprise AI infrastructure.
The Company expects future investment in Sweden to focus on AI and HPC infrastructure, including the ongoing Tier III conversion of
its Boden facilities to support enterprise-grade GPU computing.
12
Similar scrutiny exists in Canada. Regulators, such as the Canada Revenue Agency (the "CRA"), which administers the federal goods
and services tax and harmonized provincial sales tax ("GST/HST") and Revenu Québec ("RQ") (which administers the Quebec
provincial sales tax, or "QST") have audited mining and digital infrastructure activities, focusing on input tax credit eligibility,
characterization of operations, and capital cost allowances. Reassessments, credit denials, and clawbacks have occurred across the
sector, often through administrative processes rather than statutory changes. The Company has contested adverse positions where
appropriate and continues to defend its filings. Broader Tier-I bitcoin mining data center industry challenges include potential
misalignment of tax outcomes with the multi-use nature and upgrade pathways of Tier-I infrastructure toward Tier-III AI/HPC-capable
facilities, increased compliance burdens, and regulatory uncertainty that may deter capital investment or affect operational flexibility in
emerging fintech and digital asset sectors.
Unfavorable outcomes and biased enforcements could result in repayment obligations (potentially including interest and penalties),
increased compliance costs, prolonged litigation, and higher effective tax burdens. These matters contribute to regulatory uncertainty,
may impact cash flows and operating results, and reflect broader enforcement scrutiny that has disproportionately affected hashrate
services relative to other data center uses. The Company mitigates these risks through geographic diversification, renewable energy
sourcing, workload flexibility (ASIC to GPU/HPC), conservative provisioning, engagement of local advisors, and pursuit of appeals or
judicial review as needed. Ultimate resolution may depend on legislative clarification, court determinations, or administrative
settlements.
Industry subject to evolving regulatory and tax landscape
Both the regulatory and tax landscape for digital companies is evolving. The changing regulatory landscape applies to sectors that are
based on blockchain, distributed ledgers, technology and the mining, use, sale and holding of tokens, or digital currencies, and the
blockchain technology networks that support them.
Following Russia's invasion of Ukraine, global energy security concerns have elevated regulatory scrutiny, with many countries
introducing aggressive tax policies and energy-specific levies to protect domestic supply. This geopolitical shift has coincided with the
increased interest in and adoption of AI technologies, ignited from high-performance computing breakthroughs, significantly increasing
the strategic and economic value of data centers worldwide. The new operative term in global policy circles is “sovereign data centers,”
which are facilities that nations view as critical infrastructure, to be controlled within their borders, particularly when they serve both
hashrate compute and AI workloads.
In 2025, the United States underwent a significant policy shift in favor of Bitcoin mining and digital asset innovation. Pro-Bitcoin
legislation such as the Genius Act and a growing framework for stablecoin adoption have created one of the most favorable policy
environments in the world for large-scale blockchain infrastructure. This stands in sharp contrast to Canada and Sweden, which have
adopted comparatively unfavorable Bitcoin mining measures in recent years, including restrictive energy allocation policies and
increased scrutiny of mining infrastructure. By comparison, U.S. policy is now actively courting Bitcoin miners, positioning the
country as a strategic hub for both blockchain and AI compute growth.
HIVE believes that it can continue to navigate the challenges of a mixed regulatory environment through its adaptability. In Canada and
Sweden, we have continued to operate despite policy headwinds, while in Paraguay-where we operate large-scale hydro-powered
facilities-an unexpected tariff increase on hydroelectricity last summer underscored the risk of sudden policy changes. These examples
highlight the dynamic and sometimes unpredictable nature of the Company's operating environment, as well as HIVE's proven ability
to manage and adapt to shifting energy and tax landscapes while continuing to execute its growth strategy.
Operating in an emerging industry, the Company must adapt to significant changes in regulatory, tax and industry rules and guidelines
and obtain regulatory and tax advice from external global experts. In addition, regulations and the rules, rates, interpretations, and
practices related to taxes, including consumption taxes such as VAT are constantly changing.
The Company's headquarters are in San Antonio, Texas, United States, and its registered office is in Vancouver, British Columbia,
Canada. As such, the Company is subject to the jurisdiction of the laws of the State of Texas, the Province of British Columbia and the
federal laws of each of the United States and Canada. The Company manages its data centers and trading operations from Bermuda in
order to simplify tax expectations.
13
With substantial assets in Canada, Sweden and Paraguay, the Company is subject to changes in political conditions and regulations
within these markets. Changes, if any, in policies or shifts in political attitude could adversely affect the Company's operations or
profitability. See "Energy Risks" above.
Operations may be affected in varying degrees by government regulations and decisions with respect to, but not limited to, restrictions
on price controls, currency remittance, income and consumption taxes, foreign investment, maintenance of claims, environmental
legislation, land use, electricity use and safety. Additionally, cryptocurrency prices are highly volatile, can fluctuate substantially and
are affected by numerous factors beyond the Company's control, including hacking, demand, inflation, expectations with respect to the
rate of inflation, and global or regional political or economic events.
Ongoing and future regulatory or tax changes may alter the nature of an investment in the Company or restrict the use of
cryptocurrencies in a manner that adversely affects operations. Governments may curtail or outlaw the acquisition, use, or redemption
of cryptocurrencies, or take regulatory action that increases operating costs or imposes additional licensing requirements. Such actions
could also extend to restrictions on the acquisition, ownership, holding, selling, or trading of the Company's common shares. In an
adverse scenario, these measures could force the Company to liquidate cryptocurrency inventory at unfavorable prices, reducing
shareholder value.
For further discussion of the risks associated with respect to adverse tax decisions and regulatory developments, see the Risk Factors
set forth in Item 1.A of our Annual Report, in particular “Item 1A- Risks Related to Certain Regulatory Compliance and Other Legal
Matters” and “Item 1A. Risk Factors-Risks Related to Taxation” therein.
Tax Environment-Sweden
The Company's wholly owned Swedish subsidiaries Bikupa Datacenter AB ("Bikupa") and Bikupa Datacenter 2 AB ("Bikupa 2") have
received a series of decision notices of assessment (the "decisions") from the Swedish Tax Agency (the "STA") concerning the
application of value added tax ("VAT") and, in particular, the entities' entitlement to recover input VAT on equipment and other charges.
The decisions reject recovery of input VAT for the periods assessed and require repayment of amounts previously refunded, together
with tax supplements and interest. The Company appealed the initial Bikupa decision on February 9, 2023 and the initial Bikupa 2
decision on March 10, 2023, and has appealed subsequent decisions as they have been issued. For more information regarding the
various dates of the decisions, please see Note 16-Commitments and Contingencies to our Unaudited Condensed Consolidated
Financial Statements included as a part of this Quarterly Report.
During the each step of the appeals process, the Company has engaged an independent legal firm and an independent audit firm in
Sweden with expertise in these matters to assist. Management, supported by its independent advisors, continues to believe that the
decisions are not consistent with applicable law or with the technical characteristics of the Company's operations, and that under
general principles governing the burden of proof it is for the STA to substantiate its position. The Company's position is supported by,
among other things, European Union guidelines, a ruling of the Swedish Council for Advance Tax Rulings, an information technology
forensic expert opinion and a legal opinion from a Swedish professor of VAT law.
The matters proceeded through the Administrative Court and, subsequently, the Court of Appeal, which ruled against the Company
with respect to the earliest decisions. On July 20, 2026 the Company filed applications for leave to appeal to the Supreme
Administrative Court. The Company's Swedish counsel has advised that the prospect of obtaining a favourable outcome before the
Supreme Administrative Court is remote.
14
Notwithstanding management's continuing belief in the merits of its position, and the Company's intention to pursue all available
avenues of appeal, the adverse judgments of the Court of Appeal and the related advice of the Company's Swedish counsel have caused
management to conclude that it is probable that a liability has been incurred and that the amount of that liability can be reasonably
estimated. Accordingly, during the quarter ended June 30, 2026 the Company recorded a provision of SEK 822.0 million
(approximately $84.7 million), translated at the June 30, 2026 closing rate of SEK 9.71 per USD$1.00. The non-cash charge is
presented within operating expenses and the provision is classified as a current liability. In prior periods the Company had concluded
that the amounts claimed were not probable and no provision had been recorded.
The provision covers all VAT periods of Bikupa and Bikupa 2 through June 30, 2026. It includes SEK 769.6 million in respect of
periods for which the STA has issued a decision or suggested decision, being December 2020 to June 2025 for Bikupa and April 2021
to December 2025 for Bikupa 2, and SEK 52.4 million in respect of subsequent periods for which no decision has yet been issued on
the basis that those periods arise from the same facts and the same position taken by the STA as the periods already determined.
Interest continues to accrue on assessed amounts until settlement, and accordingly the Company's ultimate exposure may exceed the
amount of the provision. The Company is not able to estimate the amount of any such additional exposure at this time.
The Company's Swedish subsidiary Bikupa Real Estate AB has a related exposure of SEK 17.3 million (approximately $1.7 million),
comprising SEK 14.9 million of decisions and suggested decisions issued by the STA in respect of periods from January 2024 to April
2026 and SEK 2.5 million of input VAT claimed for May and June 2026 for which no decision has been issued. The facts and the issue
raised by the STA in respect of this entity differ from those in dispute for Bikupa and Bikupa 2, the entity was not party to the Court of
Appeal proceedings. Management has concluded that a loss in respect of this matter is reasonably possible but not probable, and no
provision has been recorded.
Following resolution of the appeals, the Company intends to evaluate claims against the STA and the Swedish State in respect of VAT
withheld, interest and related direct and indirect costs, and is evaluating whether interim relief may be available in respect of amounts
withheld pending a final determination. Any recovery arising from such claims may represent a change in provision; however no asset
has been recognized and no amount has been offset against the provision as of the date hereof.
It is not yet known when these disputes will be finally resolved, and the process could extend well beyond one year. The HPC and
ASIC compute industries are rapidly evolving, and there can be no assurance that changes in the laws or policies of Sweden will not
further affect the Company's VAT position. The Company will reassess the provision at each reporting date for the outcome of the leave
applications, the status of deferral requests, decisions issued in respect of periods not yet assessed, and any revised advice from its
Swedish counsel. In parallel, the Company is exploring opportunities for redress through other means, including initiating a proceeding
with the European Commission due to the Swedish administrative court systems refusal to refer unsettled questions of European Union
law to the Court of Justice of the European Union.
In the spring budget of 2023, the Swedish Parliament abolished the reduced energy tax for data centers, effective as of July 1, 2023. As
a result of this decision, the Company's cost of energy at its HIVE Sweden facilities has increased by approximately 0.30 SEK per
kWh. Prior to the effective date of the abolishment of the energy tax reduction, HIVE's total cost of energy at the HIVE Sweden
facilities was approximately 0.30 SEK ($0.03) per kWh. Revenues attributable to these facilities typically ranges from 0.80 to 1.00
SEK ($0.07 to $0.09) per kWh. As at June 30, 2026, the HIVE Sweden facilities represent approximately 5% of the Company's global
hashrate services per day. We believe that this change is mitigated through the supplemental power pricing arrangement that was
entered into in order to fix prices for portion of their electricity consumption at attractive prices. The Company has been exploring, and
will continue to explore, strategies for minimizing the impact.
Tax Environment-Canada
Effective February 5, 2022, the Canadian government enacted tax measures to potentially restrict the ability of hashrate services
companies to claim back the consumption taxes they incur on purchases of goods and services made in Canada and imports of goods
and services into Canada. While still uncertain, these restrictions could impact on the Company's ability to claim back its consumption
taxes (i.e. GST/HST) which apply at combined rates from 5% to 15% on the cost of goods and services, and thereby add to the
Company's ongoing operating costs and the costs of its capital expenditures and imports into Canada.
Unrelated to the legislative changes outlined above, three of the Company's Canadian subsidiaries have been reassessed by CRA or RQ
for consumption taxes and income taxes, and related penalties and interest. All such reassessments are being disputed by the respective
subsidiaries and their representatives.
Additionally, the Company and some of its Canadian subsidiaries are currently under audit by the CRA and/or RQ also in relation to
income tax and consumption taxes, again largely unrelated to the legislative changes outlined above. The Company and its subsidiaries
are working towards favorable resolution of these audits but further adverse tax reassessments could result. If any such adverse
reassessments are issued, the Company and its subsidiaries intend to vigorously dispute those reassessments.
The Company has recorded a provision during the year ended March 31, 2024 in the amount of $4.5 million receivable by its
subsidiary 9376-9974 Quebec Inc., for our ability to claim back our consumption taxes. During the year ended March 31, 2025, an
additional provision was recognized of $0.3 million and the Company recovered $0.8 million in relation to the provision of $4.5
million and reversed an additional $0.5 million of the same provision as a result of further examination of the sales tax provision
amounts.
During the year ended March 31, 2026, the Company paid $0.3 million towards the $0.3 million provisioned amount. The Company
also received an assessment of $2.3 million for sales tax payable that is included in the provision as a result of a sales tax audit related
to periods prior to the acquisition of 9376-9974 Quebec Inc. in 2021. During the year ended March 31, 2026 and prior periods, the
Company received sales tax credits totaling $2.3 million that were applied against this assessment and accrued interest. During the
period ended June 30, 2026, there were no additional provisions, recoveries, or assessments recorded in respect of these matters.
The Company and two of its subsidiaries have claimed and are awaiting repayment by the CRA and Revenue Quebec of significant
consumption tax credits, most of which are being withheld pending resolution of ongoing audits:
1.
9376-9974 Quebec Inc. has filed for and claimed approximately C$8.7 million in consumption tax credits, which to date
remain unpaid; and
Hive Atlantic Datacentres Ltd. has filed for and claimed approximately C$40.9 million in consumption tax credits, which to
date remain unpaid.
15
The Company continues to work with its representatives to achieve a successful resolution of the various tax audits and reassessments,
particularly for the following:
The Company and certain of its wholly-owned subsidiaries, including 9376-9974 Québec Inc., Hive Digital Data Ltd. (incorporated in
Bermuda), and Hive Atlantic Datacentres Ltd. ("Hive Atlantic"), are engaged in ongoing disputes with the CRA, RQ and other
provincial tax authorities. Management, together with its external tax and legal advisors, continues to pursue resolution of these matters
through the applicable objection, appeal, and court processes. The significant matters are as follows:
9376-9974 Québec Inc. received Notices of Assessment from RQ denying capital cost allowance ("CCA") claimed on certain
assets for its taxation years ended December 31, 2021 through 2024. The total amount assessed, including interest and
penalties, is C$5.4 million. 9376-9974 Québec Inc. is disputing this assessment and intends to file a notice of objection.
The Company is disputing disallowed input tax credits of C$0.3 million for reporting periods from July 1, 2017 to June 30,
2021. Subsequent to the period covered by this Report, on July 27, 2006, the Company also received a Notice of Reassessment
from the CRA, issued July 27, 2026, in the amount of C$4 million, inclusive of interest and penalties, asserting that GST/HST
should apply to treasury and currency management services supplied by the Company to Hive Digital Data Ltd. for the period
from July 1, 2021 to March 31, 2023, on the basis that Hive Digital Data Ltd. has a permanent establishment in Canada. The
Company is disputing this reassessment.
Hive Atlantic is disputing a GST/HST reassessment of C$4.2 million in respect of reporting periods from May 1, 2021 to
December 31, 2021, and has filed a Notice of Appeal with the Tax Court of Canada. Hive Atlantic also received a proposal
letter from the CRA quantifying proposed GST/HST adjustments of C$50.5 million, exclusive of interest and penalties, for the
period from January 1, 2022 to March 31, 2025, asserting that GST/HST should apply to sales of hashpower by Hive Atlantic
to Hive Digital Data Ltd., again on the basis of an alleged permanent establishment in Canada. No Notice of Assessment has
been issued in respect of this proposed adjustment as of the date of this report. Hive Atlantic is disputing both matters.
Management has concluded that an unfavourable outcome in respect of these matters is reasonably possible but not probable.
Accordingly, no provision has been recorded in these financial statements. The Company and its subsidiaries will continue to monitor
developments and will record a provision if and when an outflow of resources becomes probable and reliably estimable. Further, in the
event that we are unable to successfully dispute these assessments, we believe any amounts ultimately owed will be offset by the
credits described above.
For further discussion of the risks associated with a potential adverse outcome with respect to tax disputes in Canada, see “Item 1A.
Risk Factors-Risks Related to Taxation” in our Annual Report.
October 10, 2025 Crypto Crash
On October 10, 2025, the price of Bitcoin fell to approximately $104,582 (the "October 10 Event") from a high of $122,509 earlier that
day, and an all-time high of $126,198 on October 6, 2025. Since its inception, Bitcoin's price has been subject to considerable volatility.
On the one hand, as acceptance and adoption of Bitcoin increase, some institutional and retail investors have sought to increase their
exposure to Bitcoin through leveraged positions. On October 10, 2025, approximately $19 billion in leveraged positions were
liquidated, which contributed to the price decline.
This phenomenon is not unique to Bitcoin and has been observed in traditional financial markets; for instance, automated computerbased trading is often cited as a contributing factor to the stock market crash of October 19, 1987. Events such as the October 10 Event
tend to erode user and investor confidence and negatively affect the Company's operations and outlook. The price of Bitcoin has not
recovered from the high of $126,198 on October 6, 2025, and had a closing price of approximately $62,814 on July 31, 2026. There can
be no guarantees that similar events will not occur in the future. In the event one or such events occurs, the Company may experience a
material adverse change.
Expansion of HPC Business
The Company continues to develop its HPC business. The ongoing expansion of existing and planned facilities is subject to various
factors, and may be delayed or adversely affected by such factors beyond the Company's control, including delays in the delivery or
installation of equipment by suppliers, difficulties in integrating new equipment into existing infrastructure, shortages in materials or
labor, defects in design or construction, diversion of management resources, insufficient funding, or other resource constraints. Actual
costs for development may exceed the Company's planned budget. Delays, cost overruns, changes in market circumstances and other
factors may result in different outcomes than those intended. In addition, to remain competitive, the Company will need to continue to
invest in hardware and equipment at its facilities required for maintaining the Company's HPC activities. Should competitors introduce
new services/software embodying new technologies, the Company's hardware and equipment and its underlying technology may
become obsolete and require substantial capital to replace such equipment. There can be no assurance that HPC hardware will be
readily available when the need is identified.
The growth of our HPC business may be affected by increasing environmental concerns related to noise pollution and water
consumption. Communities where data centers are planned are demanding more oversight, leading to stricter permitting processes.
Opposition to the siting of data centers could result in projects being denied, delayed, or forced to comply with costly new regulations.
The future of data center site location is evolving.
We believe that the demand for HPC and AI services will continue to increase, and that we will be able to attract and retain new
customers. Customer acquisition and retention will depend on our ability to meet HPC and AI compute demands in a cost-competitive
manner. Factors that could affect our competitiveness include the location and efficiency of our facilities, our pricing relative to
competitors, and our ability to provide a high-uptime supply of compute. Further, if AI and other HPC-intensive use cases are not
broadly adopted, or if new use cases do not emerge, our market opportunity may be smaller than we expect.
16
HIVE PARAGUAY FACILITIES
The Company announced on July 22, 2024 that it planned to develop its HIVE Valenzuela Facility. The Company has since entered
into: (i) an engineering and construction agreement executed on September 26, 2024 between W3X S.A., a wholly-owned subsidiary of
the Company, and Rieder & CIA S.A.C.I., a company organized pursuant to the laws of Paraguay, relating to high voltage infrastructure
within the local utility's substation, bringing down the power to the HIVE Valenzuela Facility for which the contract value is
approximately $3.8 million; and (ii) a purchase order from a hardware supplier for a total of 160 MVA of substation components
including transformers, miscellaneous electronic parts and components at an aggregate cost of $6.0 million. Construction of the
Valenzuela facility was completed in November 2025.
On January 24, 2025 the Company entered into a binding letter of intent with Bitfarms Ltd. to acquire the Yguazú Facility, a 200 MW
hydro-powered data center facility in Paraguay and the acquisition closed on March 17, 2025. Upon competition of the acquisition, the
Company's operational capacity in Paraguay totaled 300 MW. We believe that the Company's expansion in Paraguay will solidify the
Company's leadership as one of Latin America's largest hashrate compute providers.
The acquisition was valued at $56 million and included ownership of a 240 MVA substation with 200 MW of capacity as well as all
associated land and facilities.
Key terms of the deal included:
• $25 million payable at closing, which occurred on March 17, 2025.
• $31 million payable in equal installments over six months following closing.
In addition to this, HIVE assumed $19 million of PPA deposits to ANDE, the Paraguayan utility company, and assumed remaining
construction completion costs. As of March 31, 2026, the full PPA deposit was paid to ANDE.
On April 6, 2025, the Company announced the energization and commencement of operations at the HIVE Yguazú Facility. This site
represents a key component of the Company's multi-phase infrastructure expansion strategy.
Mining capacity in Paraguay came online in three distinct phases:
•
•
•
Phase 1 (HIVE Yguazú Facility - Air-Cooled):
Phase 1 included the deployment of 100 MW of air-cooled ASIC equipment and was completed in June, 2025. Phase 1
contributed, bringing approximately 5 EH/s to the Company's total Bitcoin mining capacity the Company's total installed
capacity to 11.5 EH/s, at an average efficiency of approximately 20 Joules per TeraHash (J/TH).
Phase 2 (HIVE Yguazú Facility - Hydro-Cooled):
Phase 2 added an additional 100 MW of capacity at the HIVE Yguazú Facility. The Company deployed Bitmain Hydro
AntSpace containers equipped with Bitmain S21+ Hydro ASIC equipment. Phase 2 was completed in early September, 2025
and delivered an incremental 6.5 EH/s of hashrate. Upon the completion of Phase 2, the Company's total installed capacity
reached approximately 18 EH/s, with a projected fleet efficiency of approximately 18.5 J/TH.
Phase 3 (HIVE Valenzuela Facility - Hydro-Cooled):
The third and final phase involved the addition of 100 MW of hydro-cooled capacity at the Company's Valenzuela Facility,
utilizing the same Bitmain Hydro AntSpace and Bitmain S21+ Hydro miner configuration as Phase 2. Phase 3 was completed
on November 10, 2025. Upon completion, Phase 3 contributed an additional 6.5 EH/s of hashrate, bringing the Company's
total installed hashrate capacity to approximately 24.5 EH/s. Fleet-wide energy efficiency is expected to improve further to
approximately 17.5 J/TH.
On October 20, 2025, the Company announced a 100 MW expansion of its infrastructure at its Yguazú site in Paraguay, targeted for
calendar year 2026. This expansion will increase the Company's total renewable capacity in Paraguay to 400 MW.