|
China Gold International Resources Corp. Ltd. is a gold and base metal mining company engaged in the operation, acquisition, development, and exploration of mineral properties. The company's principal operations consist of two producing mines in China: the Chang Shan Hao Gold Mine in Inner Mongolia and the Jiama Copper-Gold Polymetallic Mine in Tibet. The CSH Mine focuses on gold production, while the Jiama Mine produces copper, gold, silver, lead, zinc, and molybdenum. China Gold International holds a majority interest in the CSH Mine and full ownership of the Jiama Mine. The company is supported by China National Gold Group, which is its largest shareholder. Operations include open-pit mining at CSH and underground and open-pit mining at Jiama, with ongoing exploration activities at satellite deposits such as Bayi Ranch and Zegulang North. Summarised from the company's own disclosures, fiscal year ended Apr 2026 |
Industry Gold | Homepage chinagoldintl.com |
| Sector Basic Materials | IR page chinagoldintl.com/investors | |
|
Tags
gold mining, copper mining, polymetallic mining, open-pit mining, underground mining, mineral exploration, base metals, precious metals, Chang Shan Hao Gold Mine, CSH Mine, Jiama Copper-Gold Polymetallic Mine, Jiama Mine, China National Gold Group, Bayi Ranch, Zegulang North, Youlongbu tailings storage facility, Guolanggou Tailings Dam
|
Press page chinagoldintl.com/investors/hksef/announcements |
Metrics
| Valuation | |
|---|---|
| Market cap | HK$ 56.64B |
| Market cap (USD) | $ 7.218B |
| P/E | 15.54 |
| PEG | 0.56 |
| P/BV | — |
| P/S | 5.51 |
| P/OCF | 10.17 |
| P/FCF | — |
| Dividend yield | 2.6% |
| Turnover / mcap | 0.61% |
| Returns | |
|---|---|
| ROE | — |
| ROI | 215.2% |
| ROIC | 271.9% |
| Profit margin | 35.6% |
| Growth | |
|---|---|
| Revenue growing | Yes |
| Profits growing | Yes |
| Revenue up 3y | No |
| Revenue up 5y | No |
| Earnings growth 3y (net profit CAGR) | 28.0% |
| Quality | |
|---|---|
| Profitable | Yes |
| Margin expanding | Yes |
| Buying back stock | No |
| Diluting (TTM) | No |
| Debt/Equity | — |
| Podcast bulls (TTM) | Sign up |
| Podcast bears (TTM) | Sign up |
| Podcast sentiment (TTM) | Sign up |
| Podcast sentiment % (TTM) | Sign up |
| News sentiment (TTM) | 7 |
| Quality score | 26.7% |
| Insiders | |
|---|---|
| Buys, 1w | Sign up |
| Buys, 1m | Sign up |
| Buys, 1y | Sign up |
| Sells, 1w | Sign up |
| Sells, 1m | Sign up |
| Sells, 1y | Sign up |
| Figure | FY 2025 | FY 2024 | FY 2023 | FY 2022 | FY 2021 | FY 2020 | FY 2019 | FY 2018 |
|---|---|---|---|---|---|---|---|---|
| Revenue | 1.31B | 756.646M | 459.434M | 1.105B | 1.137B | 864.032M | 657.459M | 570.57M |
| Net profit | 472.315M | 65.298M | -22.969M | 225.401M | 268.675M | 113.938M | -32.151M | -4.19M |
Operating KPIs — quarters
Business figures the company publishes beside its accounts (users, subscribers, same-store sales, production, occupancy ...), read from its results releases and reports, with the growth on the same period a year earlier beneath each: computed from the figures, and as the company states it where it does. Each figure links to its source; counts at a period end show under that period.
| KPI | Dec 23 | Mar 24 | Jun 24 | Dec 24 | Mar 25 | Jun 25 |
|---|---|---|---|---|---|---|
| Gold production (ounces) | 24,290 | 17,276 | 40,257 | 36,719 | 23,739 | 45,829 |
| ↳ YoY growth | +51.2% | +37.4% | +13.8% | |||
| Copper production (pounds) | 184,077 | 4.61M | 23.3M | 44.1M | 37.3M | 77M |
| ↳ YoY growth | +23,876.9% | +707.9% | +231.1% | |||
| Zinc production (pounds) | — | — | — | — | 11.9M | — |
| Silver production (ounces) | 75,549 | 135,503 | 432,621 | 1.48M | 1.31M | 2.75M |
| ↳ YoY growth | +1,858.6% | +870.0% | +535.8% | |||
| Reported | — | — | — | — | — | — |
Operating KPIs — years
Business figures the company publishes beside its accounts (users, subscribers, same-store sales, production, occupancy ...), read from its results releases and reports, with the growth on the same period a year earlier beneath each: computed from the figures, and as the company states it where it does. Each figure links to its source; counts at a period end show under that period.
Podcast Mentions
Announcements and reports published on HKEXnews, newest first, monthly and next-day returns, proxy forms and board-meeting notices included. The link opens the announcement on HKEXnews. Press releases from the company's own website, newest first.
(a company incorporated under the laws of British Columbia, Canada with limited liability) (Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
RESULTS ANNOUNCEMENT FOR THE SIX MONTHS ENDED JUNE 30, 2026 FINANCIAL HIGHLIGHTS 2026 2025 For the six months ended June 30, US$’000 US$’000 Revenue Net income (Loss) Basic earnings (loss) per share (cents) Net cash flows from operations Property, plant and equipment Property, plant and equipment capital expenditures Cash and cash equivalents Working capital
914,216 512,124 127.99
580,365 202,322 50.53
555,180 1,338,153 22,774 586,417 909,894
334,848 1,327,224 29,301 309,195 353,863
RESULTS The board of directors (the “Board”) of China Gold International Resources Corp. Ltd. (the “Company” together with its subsidiaries, referred hereto as the “Group”) is pleased to announce the condensed consolidated results of the Group for the three and six months ended June 30, 2026 with comparative figures for the comparable period in 2025, as follows:
-1-
MANAGEMENT’S DISCUSSION AND ANALYSIS Management’s Discussion and Analysis of Financial Condition and Results of Operations for the three and six months ended June 30, 2026. (Stated in U.S. dollars, except as otherwise noted)
FORWARD-LOOKING STATEMENTS THE COMPANY
1 2
OVERVIEW
2
PERFORMANCE HIGHLIGHTS
2
OUTLOOK
3
RESULTS OF OPERATIONS
5
SELECTED QUARTERLY FINANCIAL DATA
5
SELECTED QUARTERLY AND ANNUAL PRODUCTION DATA AND ANALYSIS
5
REVIEW OF QUARTERLY AND ANNUAL DATA
7
NON-IFRS MEASURES
9
MINERAL PROPERTIES
11
THE CSH MINE
11
THE JIAMA MINE
13
LIQUIDITY AND CAPITAL RESOURCES
17
CASH FLOWS
18
OPERATING CASH FLOW
19
INVESTING CASH FLOW
19
FINANCING CASH FLOW
19
EXPENDITURES INCURRED
19
GEARING RATIO
19
SIGNIFICANT INVESTMENTS, ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES. ASSOCIATES AND JOINT VENTURES, AND FUTURE PLAN FOR MATERIAL INVESTMENTS OF CAPITAL ASSETS
20
CHARGE ON ASSETS
20
EXPOSURE TO FLUCTUATIONS IN EXCHANGE RATES AND RELATED HEDGES
20
COMMITMENTS
20
RELATED PARTY TRANSACTIONS
21
PROPOSED TRANSACTIONS
22
CRITICAL ACCOUNTING ESTIMATES
22
CHANGE IN ACCOUNTING POLICIES
22
FINANCIAL INSTRUMENTS AND OTHER INSTRUMENTS
22
OFF-BALANCE SHEET ARRANGEMENTS
22
DIVIDEND AND DIVIDEND POLICY
22
OUTSTANDING SHARES
23
DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING
23
RISK FACTORS
23
QUALIFIED PERSON
23
ADDITIONAL INFORMATION
23
-2-
MANAGEMENT’S DISCUSSION AND ANALYSIS The following Management Discussion and Analysis of financial condition and results of operations (“MD&A”) is prepared as of August 13, 2026. It should be read in conjunction with the consolidated financial statements and notes thereto of China Gold International Resources Corp. Ltd. (referred to herein as “China Gold International”, the “Company”, “we” or “our” as the context may require) for the three and six months ended June 30, 2026 and the three and six months ended June 30, 2025, respectively. Unless the context otherwise provides, references in this MD&A to China Gold International or the Company refer to China Gold International and each of its subsidiaries collectively on a consolidated basis. The following discussion contains certain forward-looking statements relating to the Company’s plans, objectives, expectations and intentions, which are based on the Company’s current expectations and are subject to risks, uncertainties and changes in circumstances. Readers should carefully consider all of the information set out in this MD&A, including the risks and uncertainties outlined further in the Company’s Annual Information Form (“Annual Information Form” or “AIF”) dated March 30, 2026 on SEDAR+ at www.sedarplus.ca, www.chinagoldintl.com and www.hkex.com.hk. For further information on risks and other factors that could affect the accuracy of forward-looking statements and the result of operations of the Company, please refer to the sections titled “Forward-Looking Statements” and “Risk Factors” and to discussions elsewhere within this MD&A. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks.
FORWARD-LOOKING STATEMENTS Certain statements made herein, other than statements of historical fact relating to the Company, represent forward-looking information. In some cases, this forward-looking information can be identified by words or phrases such as “may”, “will”, “expect”, “anticipate”, “contemplates”, “aim”, “estimate”, “intend”, “plan”, “believe”, “potential”, “continue”, “is/are likely to”, “should” or the negative of these terms, or other similar expressions intended to identify forward-looking information. This forward-looking information includes, among other things; China Gold International’s production estimates, business strategies and capital expenditure plans; the development and expansion plans and schedules for the CSH Mine and the Jiama Mine; China Gold International’s financial condition; the regulatory environment as well as the general industry outlook; general economic trends in China; and statements respecting anticipated business activities, planned expenditures, corporate strategies, participation in projects and financing, and other statements that are not historical facts. By their nature, forward-looking information involves numerous assumptions, both general and specific, which may cause the actual results, performance or achievements of China Gold International and/or its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward–looking information. Some of the key assumptions include, among others, the absence of any material change in China Gold International’s operations or in foreign exchange rates, the prevailing price of gold, copper and other non-ferrous metal products; the absence of lowerthan-anticipated mineral recovery or other production problems; effective income and other tax rates and other assumptions underlying China Gold International’s financial performance as stated in the Company’s technical reports for its CSH Mine and Jiama Mine; China Gold International’s ability to obtain regulatory confirmations and approvals on a timely basis; continuing positive labor relations; the absence of any material adverse effects as a result of political instability, terrorism, natural disasters, pandemics such as COVID-19, litigation or arbitration and adverse changes in government regulation; the availability and accessibility of financing to China Gold International; and the performance by counterparties of the terms and conditions of all contracts to which China Gold International and its subsidiaries are a party. The forward-looking information is also based on the assumption that none of the risk factors identified in this MD&A or in the AIF that could cause actual results to differ materially from the forward-looking information actually occurs.
-3-
MANAGEMENT’S DISCUSSION AND ANALYSIS Forward-looking information contained herein as of the date of this MD&A is based on the opinions, estimates and assumptions of management. There are a number of important risks, uncertainties and other factors that could cause actual actions, events or results to differ materially from those described as forward-looking information. China Gold International disclaims any obligation to update any forward-looking information, whether as a result of new information, estimates, opinions or assumptions, future events or results, or otherwise except to the extent required by law. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking information in this MD&A is expressly qualified by this cautionary statement. The reader is cautioned not to place undue reliance on forward-looking information.
THE COMPANY Overview China Gold International is a gold and base metal mining company registered in British Columbia, Canada. The Company’s main business involves the operation, acquisition, development and exploration of gold and base metal properties. The Company’s principal mining operations are the Chang Shan Hao Gold Mine (“CSH Mine” or “CSH”), located in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine (“Jiama Mine” or “Jiama”), located in Tibet, China. China Gold International holds a 96.5% interest in the CSH Mine, while its Chinese joint venture (“CJV”) partner holds the remaining 3.5% interest. The Company owns a 100% interest in the Jiama Mine, which hosts a large scale copper-gold polymetallic deposit containing copper, gold, molybdenum, silver, lead and zinc metals. China Gold International’s common shares are listed on the Toronto Stock Exchange (“TSX”) and The Stock Exchange of Hong Kong Limited (“HKSE”) under the symbol CGG and the stock code 2099, respectively. Additional information about the Company, including the Company’s Annual Information Form, is available on SEDAR+ at sedarplus.ca as well as Hong Kong Exchange News at hkexnews.hk.
Performance Highlights Three months ended June 30, 2026 •
Revenue increased by 50% to US$461.0 million from US$307.3 million for the same period in 2025.
•
Mine operating earnings of US$327.3 million, increased by US$167.9 million from mine operating earnings of US$159.4 million for the same period in 2025.
•
Net profit of US$275.8 million increased by US$159.5 million from US$116.3 million for the same period in 2025.
•
Cash flow from operation of US$286.5 million, increased from US$191.3 million for the same period in 2025.
•
Total gold production decreased by 14% to 37,498 ounces from 43,403 ounces for the same period in 2025.
•
Total copper production was 41.1 million pounds (approximately 18,641 tonnes) a slight increase from 39.7 million pounds (approximately 18,013 tonnes) for the same period in 2025.
-4-
MANAGEMENT’S DISCUSSION AND ANALYSIS Six months ended June 30, 2026 •
Revenue increased by 58% to US$914.2 million from US$580.4 million for the same period in 2025.
•
Mine operating earnings of US$620.1 million, increased by US$343.0 million from mine operating earnings of US$277.1 million for the same period in 2025.
•
Net profit of US$512.1 million increased by US$309.8 million from US$202.3 million for the same period in 2025.
•
Cash flow from operation of US$555.2 million, increased from US$334.8 million for the same period in 2025.
•
Total gold production decreased by 18% to 72,317 ounces from 88,200 ounces for the same period in 2025.
•
Total copper production was 78.6 million pounds (approximately 35,671 tonnes) a slight increase from 77.0 million pounds (approximately 34,924 tonnes) for the same period in 2025.
Outlook After the repairs and reinforcements of the overflow of the Guolanggou Tailings Dam, the Government of Tibet Autonomous Region and relevant departments of the central government approved the resumption of Jiama’s operations on May 30, 2024, with a daily processing capacity of 34,000 tonnes, which is lower than the design processing capacity. The Company is actively advancing the construction of the Youlongbu tailings storage facility (Phase III tailings pond), which is expected to be completed and put into operation by the end of 2027. The total daily processing capacity is anticipated to increase to 44,000 tpd once the Youlongbu tailings storage facility is in operation. The open-pit operations at the CSH gold mine are nearing the end of its mine life. To ensure stable production continuity, the Company is actively advancing the transition from open-pit to underground mining, with relevant construction works already commenced. With the CSH pit’s increased depth, the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. On May 22, 2026, a localized slope instability event occurred at CSH Gold Mine, which was a localized geological hazard primarily attributed to heavy rainfall in the area combined with complex geological conditions. Mining activities at the open pit remain temporarily suspended pending further geotechnical and operational assessment. Processing operations continue utilizing available low-grade ore stockpiles to maintain production. The Company is currently assessing the potential impact of the event on mining operations and future production plans. Based on the information currently available, the Company does not expect the event to materially affect its annual production guidance. Inconsideration of the events, the Company reports separate production guidance for the two mines in 2026.
CSH Mine: •
The total gold production is estimated between 70,732 ounces (2.2 tonnes) and 83,592 ounces (2.6 tonnes).
Jiama Mine: •
The copper production will be approximately between 140 million pounds (63,500 tonnes) and 149 million pounds (67,500 tonnes);
•
The gold production will be approximately between 70,732 ounces (2.2 tonnes) and 75,554 ounces (2.35 tonnes);
•
The silver production will be approximately between 4.18 million ounces (130 tonnes) and 4.82 million ounces (150 tonnes).
-5-
MANAGEMENT’S DISCUSSION AND ANALYSIS Outline of the Long-Term Development Plan for the Jiama Mine In 2024, the Company successfully restored stable operation at the Jiama Mine. In addition, the Company continued to focus its efforts on optimizing resource utilization plan, integrating the identified high-grade underground resources, and accelerating the exploration work at high potential zones. On June 30, 2026, the Company announced a transformational mineral resource update for the Jiama Mine, with measured mineral resource increased 523% and proven mineral reserve increased 1,170%. The long-term development plan for the Jiama Mine consists of three phases: •
Prior to the completion of the construction of the new tailings storage facility (the “Youlongbu tailings storage facility”), the Jiama Mine Phase II processing plant will maintain and operate at its current processing capacity of 34,000 tons per day to match the Guolanggou’s storage capacity (the operation of Phase I processing plant has been suspended since May 2024).
•
The Youlongbu tailings storage facility is scheduled to commence operation by the end of 2027, allowing a further increase in the Jiama Mine’s production capacity. Over the next two years, as part of the underground resource integration plan, the Company plans to apply to increase the permitted capacity on its mining license for the Jiama Mine, subject to compliance with the relevant safety requirements. Currently, the permitted capacity on the mining license of the Jiama Mine is 14.4 million tonnes per year (approximately 44,000 tonnes per day based on 330 operating days per year). Subject to the government approval of an increased annual mining rate, and following the commissioning of Youlongbu tailings storage facility, the Jiama Mine’s ore processing volume will return to the level of 50,000 tonnes per day, in line with the designed processing capacity of the processing plants. In addition, endeavors are underway so that the production levels at the Jiama Mine will restore to those before the Guolanggou tailings overflow through blending of high-grade underground ores.
•
The Company is also working to substantially expand the known mineralized system and delineate additional mineral resources and reserves at depth and in surrounding areas of the Jiama Mine, including the Zegulang North. The Company completed a NI 43-101 Technical Report on June 30, 2026 with the updated Mineral Resource, which significantly expands the Jiama Mine’s scale and development potential, providing a robust foundation for future production expansion, mine life extension and further technical studies on larger-scale mining scenarios. Subject to the final exploration outcomes and feasibility studies on resource development, the Company will formulate a comprehensive expansion plan for the Jiama Mine area. This study has already been initiated at a preliminary stage. The Company will provide an update on the progress and results in due course.
-6-
MANAGEMENT’S DISCUSSION AND ANALYSIS RESULTS OF OPERATIONS Selected Quarterly Financial Data Quarter ended 2025
2026 (US$ in thousands except per share) Revenue Cost of sales Mine operating earnings General and administrative expenses Exploration and evaluation expenditures Research and development expenses Income from operations Foreign exchange gain (loss) Finance costs Profit before income tax Income tax expense (credit) Net profit (loss) Basic & diluted earnings (loss) per share (cents)
2024
30-Jun
31-Mar
31-Dec
30-Sep
30-Jun
31-Mar
31-Dec
30-Sep
461,013 133,675 327,338 16,824 61 6,463 303,990 4,796 3,365 312,823 37,070 275,753
453,203 160,433 292,770 15,100 171 5,459 272,040 (2,464) 4,065 267,214 30,843 236,371
384,734 174,826 209,908 21,450 268 16,399 171,791 7,381 4,511 171,694 43,994 127,699
345,026 147,993 197,033 14,184 224 7,848 174,777 (3,039) 4,711 153,450 11,156 142,294
307,269 147,872 159,397 12,068 133 5,256 141,940 (2,037) 4,580 139,252 22,909 116,343
273,096 155,444 117,653 12,232 508 3,296 101,617 (2,654) 5,002 95,770 9,791 85,979
293,567 171,413 122,154 17,877 247 8,118 95,912 (4,631) 5,313 85,540 17,223 68,317
254,581 207,762 46,819 9,944 49 4,704 32,122 2,670 5,692 30,166 2,293 27,873
68.97
59.02
31.67
35.60
29.08
21.45
16.97
6.84
Selected Quarterly and Annual Production Data and Analysis CSH Mine
Gold sales (US$ million) Realized average price (US$) of gold per ounce Gold produced (ounces) Gold sold (ounces) Total production cost (US$ per ounce) Cash production cost(1) (US$ per ounce) (1)
Three months ended June 30,
Six months ended June 30
2026
2025
2026
2025
97.75 4,546 21,500 21,500 1,772 1,282
84.58 3,319 22,090 25,483 1,612 1,251
224.45 4,703 42,853 47,724 1,776 1,291
163.67 3,094 45,829 52,893 1,619 1,153
Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A
-7-
MANAGEMENT’S DISCUSSION AND ANALYSIS Gold production at the CSH Mine decreased by 3% to 21,500 ounces for the three months ended June 30, 2026 compared to 22,090 ounces for the same period in 2025. The total production cost of gold for the three months ended June 30, 2026 increased to US$1,772 per ounce compared to US$1,612 for the same period in 2025. The cash production cost of gold for the three months ended June 30, 2026 increased to US$1,282 per ounce from US$1,251 for the same period in 2025. Jiama Mine Copper sales (US$ in millions) Realized average price 1 (US$) of copper per pound after smelting fee discount 6 Copper produced (tonnes) Copper produced (pounds) Copper sold (tonnes) Copper sold (pounds) Gold produced (ounces) Gold sold (ounces) Silver produced (ounces) Silver sold (ounces) Lead produced (tonnes) Lead produced (pounds) Lead sold (tonnes) Lead sold (pounds) Zinc produced (tonnes) Zinc produced (pounds) Zinc sold (tonnes) Zinc sold (pounds) Moly produced (tonnes) Moly produced (pounds) Moly sold (tonnes) Moly sold (pounds) Total production cost 2 (US$) of copper per pound Total production cost 2 (US$) of copper per pound after by-products credits 4 Cash production cost 4 (US$) per pound of copper Cash production cost 3 (US$) of copper per pound after by-products credits 4 1
Three months ended June 30,
Six months ended June 30,
2026
2025
2026
2025
189.18
110.72
359.84
204.22
4.74 18,641 41,096,647 17,986 39,652,946 15,998 15,741 1,542,400 1,480,033 13,226 29,158,471 12,421 27,383,757 7,757 17,102,255 7,300 16,093,281 103 226,331 85 187,481
2.86 18,013 39,710,002 17,565 38,722,492 21,313 20,881 1,436,260 1,392,389 10,262 22,624,764 9,718 21,423,651 5,477 12,075,719 5,107 11,258,963 255 559,570 234 516,452
4.66 35,671 78,640,919 35,035 77,238,998 29,464 29,287 2,776,949 2,721,138 23,970 52,845,994 23,283 51,329,537 12,124 26,728,185 11,703 25,801,005 207 456,142 197 434,085
2.70 34,924 76,993,263 34,292 75,599,786 42,371 41,619 2,750,668 2,685,804 21,038 46,381,857 20,201 44,536,444 10,893 24,015,893 10,470 23,081,507 452 997,022 494 1,087,991
2.96
3.19
3.25
3.29
(1.38)
0.33
(0.98)
0.53
2.19
2.35
2.48
2.48
(2.16)
(0.49)
(1.75)
(0.28)
A discount factor of 11.9% to 25.3% is applied to the copper benchmark price to compensate the refinery costs incurred by the buyers. The discount factor is higher if the grade of copper in copper concentrate is below 18%. The industry standard of copper in copper concentrate is between 18-20%.
2
Production costs include expenditures incurred at the mine sites for the activities related to production including mining, processing, mine site G&A and royalties etc.
3
Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A.
4
By-products credit refers to the sales of gold, silver, lead, zinc and moly during the corresponding period.
5
Increased production of by-products combined with reduced G&A and R&D costs, has resulted in by-product credits exceeding total production cost of copper.
6
Due to the relatively high discount factor applied to mixed ore, the overall copper sales price decreased compared with the prior year.
-8-
MANAGEMENT’S DISCUSSION AND ANALYSIS During the three months ended June 30, 2026, The Jiama Mine produced 18,641 tonnes (approximately 41.1 million pounds) of copper, which increased from of 18,013 tonnes (approximately 39.7 million pounds) during the comparative three month period in 2025. Total production cost of copper per pound decreased by 7% in the second quarter of 2026 as compared to the same period in 2025. Cash production cost of copper per pound decreased by 7% as compared to the same quarter in 2025. Total production cost of copper per pound after by-products and cash production cost of copper per pound after by-product also decreased in 2026 as compared to the same three month period in 2025, mainly due to higher by-product revenue from gold and silver.
Review of Quarterly and Annual Data Three months ended June 30, 2026 compared to three months ended June 30, 2025 Revenue of US$461.0 million for the second quarter of 2026, increased by US$153.7 million from US$307.3 million for the same period in 2025. Revenue from the CSH Mine was US$97.8 million, an increase of US$13.2 million from US$84.6 million for the same period in 2025. The realized average gold price increased by 37%, from US$3,319/oz in Q2 2025 to US$4,546/oz in Q2 2026. Gold sold by the CSH Mine was 21,500 ounces (gold produced: 21,500 ounces), compared to 25,483 ounces (gold produced: 22,090 ounces) for the same period in 2025. Revenue from the Jiama Mine was US$363.3 million, an increase of US$140.6 million, compared to US$222.7 million for the same period in 2025. The realized average price of copper increased by 66%, from US$2.86/pound in Q2 2025 to US$4.74/pound in Q2 2026. Total copper sold was 17,986 tonnes (39.7 million pounds) for the three months ended June 30, 2026, an increase of 2% from 17,564 tonnes (38.7 million pounds) for the same period in 2025. Cost of sales of US$133.7 million for the quarter ended June 30, 2026, a decrease of US$14.2 million from US$147.9 million for the same period in 2025. Cost of sales as a percentage of revenue for the Company decreased from 48% to 29% for the three months ended June 30, 2025 and 2026, respectively. Cost of sales was impacted by many operation factors such as grade of ore, recovery rates and stripping ratio. Refer to the sections below for details of production factors for each individual mine. Mine operating earnings of US$327.3 million for the three months ended June 30, 2026, an increase of US$167.9 million from US$159.4 million for the same period in 2025. General and administrative expenses increased by US$4.7 million, from US$12.1 million for the quarter ended June 30, 2025 to US$16.8 million for the quarter ended June 30, 2026, partially due to higher taxes and surcharges resulting from increased revenue in the current quarter. Research and development expenses of US$6.5 million for the three months ended June 30, 2026, increased from US$5.3 million for the comparative period in 2025. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes. Income from operations of US$304.0 million for the second quarter of 2026, increased by US$162.1 million, compared to US$141.9 million for the same period in 2025. Foreign exchange gain of US$4.8 million for the three months ended June 30, 2026, increased from a loss of US$2.0 million for the same period in 2025. The gain was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB.
-9-
MANAGEMENT’S DISCUSSION AND ANALYSIS Interest and other income of US$7.4 million for the three months ended June 30, 2026, increased from US$4.9 million for the same period in 2025, primarily due to higher interest income earned during the current quarter compared to the corresponding period last year. In addition, the Company recognized dividend income of US$2.9 million from China Nonferrous Mining Corporation Limited during the current quarter. Finance costs of US$3.4 million for the three months ended June 30, 2026, decreased by US$1.2 million compared to US$4.6 million for the same period in 2025. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Income tax expense of US$37.1 million for the three months ended June 30, 2026, increased by US$14.2 million from US$22.9 million for the comparative period in 2025. During the current quarter, the Company recorded deferred tax credit of US$8.2 million, compared to an expense of US$7.1 million for the same period in 2025. Net income of US$275.8 million for the three months ended June 30, 2026, increased by US$159.5 million from US$116.3 million for the three months ended June 30, 2025.
Six months ended June 30, 2026 compared to six months ended June 30, 2025 Revenue of US$914.2 million for the first half of 2026, increased by US$333.8 million from US$580.4 million for the same period in 2025. Revenue from the CSH Mine was US$224.5 million, an increase of US$60.8 million from US$163.7 million for the same period in 2025. The realized average gold price increased by 52%, from US$3,094/oz in the first six months of 2025 to US$4,703/oz in the same period of 2026. Gold sold by the CSH Mine was 47,724 ounces (gold produced: 42,853 ounces), compared to 52,893 ounces (gold produced: 45,829 ounces) for the same period in 2025. Revenue from the Jiama Mine was US$689.8 million, an increase of US$273.1 million, compared to US$416.7 million for the same period in 2025. The realized average price of copper increased by 73%, from US$2.70/pound in the first six months of 2025 to US$4.66/pound in the same period of 2026. Total copper sold was 35,035 tonnes (77.2 million pounds) for the six months ended June 30, 2026, an increase of 2% from 34,292 tonnes (75.6 million pounds) for the same period in 2025. Cost of sales of US$294.1 million for the six months ended June 30, 2026, a decrease of US$9.2 million from US$303.3 million for the same period in 2025. Cost of sales as a percentage of revenue for the Company decreased from 52% to 32% for the six months ended June 30, 2025 and 2026, respectively. Cost of sales was impacted by many operation factors such as grade of ore, recovery rates and stripping ratio. Refer to the sections below for details of production factors for each individual mine. Mine operating earnings of US$620.1 million for the six months ended June 30, 2026, an increase of US$343.0 million from US$277.1 million for the same period in 2025. General and administrative expenses increased by US$7.6 million, from US$24.3 million for the six months ended June 30, 2025 to US$31.9 million for the six months ended June 30, 2026, partially due to higher taxes and surcharges resulting from increased revenue in the current period. Research and development expenses of US$11.9 million for the six months ended June 30, 2026, increased from US$8.6 million for the comparative period in 2025. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes. Income from operations of US$576.0 million for the six months ended June 30, 2026, increased by US$332.4 million, compared to US$243.6 million for the same period in 2025.
- 10 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Foreign exchange gain of US$2.3 million for the six months ended June 30, 2026, increased from a loss of US$4.7 million for the same period in 2025. The gain was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB. Interest and other income of US$9.1 million for the six months ended June 30, 2026, increased from US$6.7 million for the same period in 2025, primarily due to higher interest income earned during the current period compared to the corresponding period last year. In addition, the Company recognized dividend income of US$2.9 million from China Nonferrous Mining Corporation Limited during the current period. Finance costs of US$7.4 million for the six months ended June 30, 2026, decreased by US$2.2 million compared to US$9.6 million for the same period in 2025. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Income tax expense of US$67.9 million for the six months ended June 30, 2026, increased by US$35.2 million from US$32.7 million for the comparative period in 2025. During the current period, the Company recorded deferred tax credit of US$10.7 million, compared to a deferred tax expense of US$4.5 million for the same period in 2025. Net income of US$512.1 million for the six months ended June 30, 2026, increased by US$309.8 million from US$202.3 million for the six months ended June 30, 2025.
NON-IFRS MEASURES The cash cost of production, cash cost after by-product credits and cash cost per ounce and per pound are measures that are not in accordance with IFRS. The Company has included these metrics to supplement its consolidated financial statements, which are presented in accordance with IFRS. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance, operating results or financial condition prepared in accordance with IFRS. The Company has included cash production cost per ounce and per pound data because it understands that certain investors use this information to determine the Company’s ability to generate earnings and cash flow. The measures are not necessarily indicative of operating results, cash flow from operations, or financial condition as determined under IFRS. The following tables provide a reconciliation of cost of sales to the cash costs of production in total dollars and in dollars per gold ounce for the CSH Mine or per copper pound for the Jiama Mine:
- 11 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Cash production cost for gold is calculated as total cost of sales adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of gold per ounce is calculated as total cash production cost divided by total gold sold (ounces). CSH Mine (Gold)
Three months ended June 30, 2026
Total Cost of sales Adjustment – Depreciation & depletion Adjustment – Amortization of intangible assets Total cash production costs
38,092,089 (10,224,780)
2026
2025 US$ Per ounce
US$ 1
Six months ended June 30, US$ Per ounce
US$
1,772 41,083,590 (476) (9,042,823)
2025 US$ Per ounce
US$
1,612 84,755,534 (355) (22,721,182)
US$
US$ Per ounce
1,776 85,622,391 (476) (24,217,957)
1,619 (458)
(302,605)
(14)
(158,213)
(6)
(421,367)
(9)
(415,399)
(8)
27,564,704
1,282
31,882,554
1,251
61,612,985
1,291
60,989,035
1,153
21,500
Total Gold sold ounces
47,724
25,483
52,893
Cash production cost of gold US$ per ounce calculated as total cash production cost divided by total gold sold ounces. Cash Production cost for copper is calculated as production costs (total cost of sales adjusted by General and administrative expenses and Research and development expenses) adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of copper (pounds) is calculated as total cash production cost divided by total copper sold (pounds). Jiama Mine (Copper with by-products credits)
Three months ended June 30, 2026 US$
Six months ended June 30, 2026
2025 US$ Per Pound
US$
US$ Per Pound
US$
2025 US$ Per Pound
US$
US$ Per Pound
2.71 217,692,307
2.88
0.39 0.15
22,317,829 8,552,476
0.30 0.11
Total Cost of sales
95,582,050
2.41 106,787,363
2.76 209,352,054
General and administrative expenses Research and development expenses
15,604,438 6,462,465
0.39 0.16
0.29 0.14
Total production cost
117,648,953
2.96 123,081,624
3.19 251,011,172
3.25 248,562,612
3.29
Adjustment – Depreciation & depletion Adjustment – Amortization of intangible assets
(24,050,180) (6,319,242)
(0.61) (25,244,711) (0.16) (7,184,749)
(0.65) (47,207,459) (0.19) (12,266,193)
(0.61) (47,845,864) (0.16) (13,933,658)
(0.63) (0.18)
Total cash production costs
87,279,531
2.19
90,652,164
2.35 191,537,520
2.48 186,783,090
2.48
By-products credits
(172,408,019)
(4.35) (110,149,983)
(2.84) (326,616,518)
(4.23) (208,730,753)
(2.76)
Total cash production costs after by-products credits (85,128,488)
(2.16) (19,497,820)
(0.49) (135,078,998)
(1.75) (21,947,663)
(0.28)
Total Copper sold pounds
11,037,384 5,256,877
39,652,946
29,737,365 11,921,753
38,722,492
Cash production cost of copper US$ per pound calculated as total cash production cost divided by total copper sold pounds.
- 12 -
77,238,998
75,599,786
MANAGEMENT’S DISCUSSION AND ANALYSIS MINERAL PROPERTIES The CSH Mine The CSH Mine is located in Inner Mongolia Autonomous Region of China (Inner Mongolia). The property hosts two lowgrade, near surface gold deposits, along with other mineralized prospects. The main deposit is called the Northeast Zone (the “Northeast Zone”), while the second, smaller deposit is called the Southwest Zone (the “Southwest Zone”). The CSH Mine is owned and operated by Inner Mongolia Pacific Mining Co. Limited, a Chinese Joint Venture in which the Company holds a 96.5% interest and Ningxia Nuclear Industry Geological Exploration Institution holds the remaining 3.5%. The CSH Mine is an open-pit mining operations with a designed mining and processing capacity of 60,000 tpd. In July 2019, CSH updated its mine plan based on a result of latest ultimate limit optimization, in which the production rate was reduced to 40,000 tpd with a life of mine (“LoM”) of seven years as of 2019. The run-of-mine ore is heap leached with cyanide solution to extract gold and electro-winned to produce a gold dore which is sold to refiners. In June 2020, the operation of southwest pit ended. The open-pit operations at the CSH gold mine are nearing the end of its mine life. With the increase in the pit’s depth, the height and exposed area of the pit wall have increased, and the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. Ensuring slope stability and avoiding systematic risks at this stage is the Company’s top priority to ensure safe and sustainable production. The Company continues to evaluate the potential for underground operations. The major new contracts entered into during the six months ended June 30, 2026:
Item No. Contract Name 1
2
Subject amount (US $ millions)
Counterpart
Construction Contract for the Ventilation and Drainage Systems China Gold Group Construction of the Haoyao’erhudong Gold Mine Annual 8.25 Million Metric Corporation Limited Tonne Gold Ore Mining Project (Conversion from Open-Cast to Underground Mining) Inner Mongolia Pacific.Mining and stripping procedure of open-pit China Gold Group Construction for the 2026-2028 period Corporation Limited
Contract period (effective day and expiration date) Date of Contract
18.54 2026.4.26-2029.12.31
2026.3.3
55.57
2026.3.6
2026.1.1-2028.12.31
Production Update CSH Mine
Ore mined and placed on pad (tonnes) Average ore grade (g/t) Recoverable gold (ounces) Ending gold in process (ounces) Waste rock mined (tonnes)
Three months ended June 30,
Six months ended June 30,
2026
2025
2026
2025
2,056,705 0.52 20,386 133,259 339,698
3,388,465 0.48 30,882 155,295 1,608,233
3,790,743 0.53 38,090 133,259 1,311,846
6,097,924 0.50 58,817 155,295 3,911,422
For the three months ended June 30, 2026, the total amount of ore placed on the leach pad was 2.1 million tonnes, with total contained gold of 20,386 ounces (634.1 kilograms). The overall accumulative project-to-date gold recovery rate remained consistent at approximately 56.74% at the end of June 30, 2026 from 56.70% at the end of March 31, 2026. Of which, gold recovery from the phase I and phase II heap leach pads were 59.77% and 55.09% at June 30, 2026, respectively.
- 13 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Exploration There was no drilling or exploration program for the six months ended June 30, 2026 for the CSH Mine.
Mineral Resource Update CSH Mine Mineral Resources by category, at December 31, 2025 under NI 43-101 are listed below: Metal
Location Remaining within the open pit limit at a cut-off grade of 0.28 g/t Au Underground at a cut-off grade of 0.30 g/t Au
Mineral Resource Category
Tonnage (x1000 t)
Au (g/t)
Au (t)
Au (Moz)
Measured Indicated M+I Inferred Measured Indicated M+I Inferred
6,031 6,647 12,678 2,576 88,200 89,850 178,050 62,090
0.68 0.72 0.70 0.41 0.67 0.58 0.62 0.49
4.09 4.75 8.84 0.15 58.66 52.07 110.72 30.68
0.132 0.153 0.285 0.005 1.89 1.67 3.56 0.99
Note: Mineral Resources are reported in relation to a conceptual open-pit mining and underground block caving mining. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate. Raw assays have been capped. Mineral Resources include Mineral Reserves. Mineral Resources are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. Additional Mineral Resources are reported at a cut-off grade of 0.30 g/t Au for underground block caving mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce is equal to 31.1035 grams. The mineral resource estimates include Au only. CGME Consulting limited (CGME) has estimated the mineral resources of the CSH gold deposit based on a cut-off grade of 0.28 g/t Au within the optimized ultimate open-pit limit and a cut-off grade of 0.30 g/t Au below the open pit limit on April 1, 2022. The resource estimate was conducted using Ordinary Kriging, validated by Inversed Distance Squared method, and Micromine modelling software. CGME considers that blocks estimated for the first estimation pass with an average anisotropic distance to samples of less than 45 m can be classified as Measured Mineral Resources, and blocks estimated for the second estimation pass with an average anisotropic distance to samples of less than 80 m can be classified as Indicated Mineral Resources, and blocks estimated for the third estimation pass with an average anisotropic distance to samples of not more than 150 m can be categorised as Inferred Mineral Resources. For those Measured and Indicated Mineral Resource blocks, CGME considers that the degree of confidence is sufficient to allow an appropriate application of technical and economic parameters to support mine planning and to allow evaluation of the economic viability of the deposit, which is also adequate to support the open pit mining operations. In CGME’s opinion, the upper portions of gold mineralization at the CSH Gold Project are amenable to extraction by open pit mining with a cut-off grade optimised of 0.28 g/t Au, and the block caving mining operation would be the choice for extraction below the optimized open pit limits with a cut-off grade of 0.30 g/t Au in this estimation based on a Reasonable Prospect for Eventual Economic Extraction (“RPEEE”). It is noted that the partial mineral resources outside of the open pit limit but above the bottom plane may not be amenable to extraction in the future. Meanwhile, the mineral resources located below 840 m ASL at NE zone and 1,250 m ASL at SW zone may not be amendable to extraction in the future due to either excessive depth or high dilution. These mineral resources that may not be amendable to extraction in the future are excluded from the Mineral Resource Statement in this Report. Block model quantity and grade estimates for the CSH gold deposit were classified according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Yuan Chen, MSc., MAIG (M4014)/RPGeo (10262) (April 2022), an independent Qualified Person for the purposes of National Instrument 43-101 and updated by Mr. Yingting Guo, MMSA., PGeo., an independent Qualified Person for the purposes of National Instrument 43-101 on December 31, 2025.
- 14 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Mineral Reserves Update CSH Mine Mineral Reserves by category at December 31, 2025 under NI 43-101 are summarized below: Metal Type
T (x 1,000)
Diluted Au g/t
Au t
Au Moz
Proven Probable
6,405 7,222
0.64 0.67
4.11 4.87
0.13 0.16
Total
13,627
0.66
8.98
0.29
Note: Mineral Reserves are reported based on the optimized ultimate open pit limit. All figures are rounded to reflect the relative accuracy of the estimate. Mineral Reserves are included in Mineral Resources. Mineral Reserves are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,568 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce is equal to 31.1035 grams. The Proven Mineral Reserves are 6.41 Mt at a grade of 0.64 g/t Au for the gold content of 4.11 t or 0.13 Moz, and the Probable Mineral Reserves are 7.22 Mt at a grade of 0.67 g/t Au for the gold content of 4.87t or 0.16 Moz, totaling Mineral Reserves of 13.63 Mt at a grade of 0.66 g/t Au for the gold content of 8.98 t or 0.29 Moz. The Mineral Reserves for the CSH gold deposit were estimated according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Guangpian Zhang, AusIMM, a full time Principal Mining Engineer for CGME and a Qualified Person for the purposes of National Instrument 43-101.
The Jiama Mine Jiama is a large copper-gold polymetallic deposit containing copper, gold, silver, molybdenum, lead and zinc, located in the Gandise metallogenic belt in Tibet Autonomous Region of China. The Jiama Mine has both underground mining and open-pit mining operations. Phase I of the Jiama Mine commenced operation in the latter half of 2010 and reached its design capacity of 6,000 tpd in early 2011. Phase II of the Jiama Mine commenced mining operations in 2018 with 44,000 tpd design capacity. The combined mining and processing design capacity at the Jiama Mine is 50,000 tpd.
- 15 -
MANAGEMENT’S DISCUSSION AND ANALYSIS The major new contracts entered into during the six months ended June 30, 2026:
Item No. Contract Name 1
2
Subject amount (US $ millions)
Counterpart
Contract for the 110kV Transmission and China Energy Construction Transformation Project of Youlongbu Tailings Group Guangxi Hydropower Reservoir by Tibet Huatailong Mining Engineering Bureau Co., Ltd. Development Co., Ltd. Xizang Huatailong Mining Development Co., Yunnan Geological Survey Ltd. Underground Drilling Project Contract for Institute of Sinochem Jamang Mine Area, 2026-2028 Geological & Mining Bureau
5.68
3.90
Contract period (effective day and expiration date) 2026.02.04 – To be completed within 90 days of contract date 2026.04.07 – 2029.04.06
Date of Contract 2026.02.04
2026.04.07
Production Update Jiama Mine
Ore processed (tonnes) Average copper ore grade (%) Copper recovery rate (%) Average gold grade (g/t) Gold recovery rate (%) Average silver grade (g/t) Silver recovery rate (%) Average Lead grade (%) Lead recovery rate (%) Average Zinc grade (%) Zinc recovery rate (%) Average Moly grade (%) Moly recovery rate (%)
Three months ended June 30,
Six months ended June 30,
2026
2025
2026
2025
2,815,556 0.77 87 0.22 80 22.57 76 1.11 83.15 0.70 75.64 0.02 34
2,982,285 0.71 85 0.30 73 21.02 71 1.08 77.85 0.63 71.75 0.04 33
5,553,734 0.75 86 0.21 78 21.21 73 1.05 81.50 0.58 75.03 0.02 34
5,837,608 0.71 84 0.31 68 21.17 69 1.04 77.06 0.58 72.2 0.04 33
Exploration In 2026, Tibet Huatailong Mining Development Co., Ltd. plans to continue geological exploration projects in the peripheral of the Jiama mining area and the Bayi Ranch, with a planned 50,840 meters of surface drilling across 55 holes (including 6,000 meters of contingent drilling), 1:5,000 hydrogeological, engineering, and environmental geological mapping covering 40.77 square kilometers and 1:2,000 mapping covering 2.96 square kilometers in the outer area of the Jiama Mining area, and 1:2,000 geological mapping covering 4 square kilometers, 1:2,000 geological cross-section surveys spanning 4 kilometers, and 1:2,000 rock geochemical surveys covering 4 square kilometers at the Bayi Ranch. The estimated total budget is approximately US$17.2 million (RMB119.08 million). By the end of the second quarter of 2026, 5,081.6 meters of drilling with 9 holes has been completed for the carry-over drilling project in the peripheral area of Jiama mine. For the preparation of the new 2026 exploration project, the tendering works for all sub-projects have been completed. Nine rigs are currently being mobilized and ready for commencement. Of the ten prerequisite items related to land use procedures, seven have been completed, and the remaining three are in progress.
- 16 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Mineral Resources Estimate In June 30, 2026, Changchun Gold Design Institute (“CGDI) was engaged to prepare the updated mineral resources and reserve estimate on the Jiama mine by combining mineralized units together with lithology, a full three-dimensional (3D) solid and block models were constructed in the mineral resource estimation for the Jiama mine. The mineralization wireframes are defined using a cutoff grade of 0.3%. In Leapfrog, radial basis function interpolation (RBF interpolation) is used to create mineralized bodies (domains) based on copper grades in the combined samples and distinct molybdenum, gold, silver, lead, and zinc (where applicable). Block models of copper, molybdenum, and other metals, as well as specific gravity (SG), were modeled using the conventional Kriging method (OK) and local variable directivity (dynamic anisotropy). Mineral resource estimates are based on the Canada CIM Mineral Resources and Reserves Definition Standard, officially adopted on May 10, 2014, and then subsequent MRMR Best Practice Guide updated in 2019, as well as Canada NI43-101 “Mineral Project Standards and Disclosures,” (2012). Mineral resource estimates for Jiama project as of June 30, 2026 are summarized in table below:
Results of Mineral Resource Estimates for Jiama Mine at cutoff grade 0.3% Cu as of June 30, 2026* Category
Mass Mt
Cu %
Mo %
Ag g/t
Au g/t
Pb %
Zn %
Cu Mt
Mo Mt
Ag Moz
Au Moz
Pb kt
Zn kt
Measured Indicated M&I Inferred
623.1 711.9 1,335 454.7
0.71 0.68 0.69 0.65
0.03 0.03 0.03 0.03
13.16 12.10 12.60 12.53
0.29 0.29 0.29 0.28
0.08 0.06 0.07 0.12
0.04 0.03 0.04 0.05
4.38 4.77 9.15 2.99
0.21 0.23 0.44 0.13
263.59 277.03 540.62 183.22
5.77 6.67 12.45 4.04
478.80 426.45 905.25 525.79
268.39 230.17 498.55 205.66
*:
Mineral Reserves and Mineral Resources have been estimated as of 30 June 2026 in accordance with NI 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101) as required by Canadian securities regulatory authorities.
0.3% copper cut-off grade has been used to report the Mineral Resource Estimation (MRE).
Reported Mineral Resources contain no allowances for hanging wall or footwall contact boundary loss and dilution. No mining recovery has been applied.
The Mineral Resources was depleted to account for UG mining tunnel and mined-out, and current open-pit excluded.
Mineral Resources are reported inclusive of Mineral Reserves.
All Mineral Resource Estimates including Cu, Mo, Au, Ag, Pb, and Zn grade and their tonnages have been rounded to reflect the imprecise nature of the estimates for each classification category, therefore totals may not appear to sum correctly due to rounding.
Tony (Yingting) Guo, PhD, PGeo and Chaoxian (Ian) Zhou, MSc estimated the Mineral Resources. This Mineral Resource Estimation (MRE) was estimated with an effective date of 30 June 2026 and depleted to account for annual production up until 31 December 2025.
Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.
M, Measured, I, Indicated.
- 17 -
MANAGEMENT’S DISCUSSION AND ANALYSIS As of June 30, 2026, the total measured resources at the Jiama Mine mining area include 4.38 million tons of copper metal, with a grade of 0.71%; Molybdenum metal content was 0.21 million tons, grade 0.03%; Lead metal content was 0.48 million tons, grade 0.08%; Zinc metal content was 0.27 million tons, grade 0.04%; Associated gold metal content is 5.77 million ounces, grading 0.29g/t; Associated silver metallic content is 264 million ounces, with a grade of 13.16 g/t. Indicated resource of 4.77 million tons of copper metal, grade 0.68%; Molybdenum metal content was 0.23 million tons, grade 0.03%; Lead metal content was 0.43 million tons, grade 0.06%; Zinc metal content is 0.23 million tons, grade 0.03%; Gold metal content is 6.67 million ounces, with a grade of 0.29 g/t; Silver metallic content is 277 million ounces, with a grade of 12.10g/t. The inferred resource contains 2.99 million tons of copper metal, with the copper grade of 0.65%; Molybdenum metal content was 0.13 million tons, grade 0.03%; Lead metal content was 0.53 million tons, grade 0.12%; Zinc metal content was 0.21 million tons, grade 0.05%; Gold metal content is 4.04 million ounces, with a grade of 0.28 g/t; Silver metal content is 183 million ounces, with a grade of 12.53 g/t.
Mineral Reserves Estimate Updated mineral reserve estimates are based on the 2019 definition standards set by the Canadian Institute of Mines, Metallurgy and Petroleum (CIM). The mineral reserves of the Jiama Mine project were completed by CGDI. Reserve estimates are based on data and information up to December 31, 2025. Open-pit copper grade 0.3% and underground copper grade 0.5% as the cutoff grades were used for the mineral reserve estimate. The reserve estimate results are summarized in Table below: As of the June 30, 2026, the total proven mineral reserves under at Jiama Mine are 310.9 million tons of ore, containing 2.8 million tons of copper at a grade of 0.90%, 0.11 million tons of molybdenum at a grade of 0.035%, 3.98 million ounces of gold at a grade of 0.4 g/t, 179.3 million ounces of silver at a grade of 17.94 g/t, 0.26 million tons of lead at grade of 0.08% and 0.13 million tons of zinc at a grade of 0.04%. The total probable mineral reserves under at Jiama Mine are 340.3 million tons of ore, containing 2.93 million tons of copper at a grade of 0.86%, 0.116 million tons of molybdenum at a grade of 0.034%, 4.47 million ounces of gold at a grade of 0.41 g/t, 186.2 million ounces of silver at a grade of 13.23 g/t, 0.20 million tons of lead at grade of 0.06% and 0.09 million tons of zinc at a grade of 0.03%.
Mineral Reserves at Jiama Project as of June 30, 2026* Category
Ore Mt
Cu %
Mo %
Proven Probable Total
310.9 340.3 651.2
0.90 0.86 0.88
0.035 0.034 0.034
*:
Average Grade Au Pb g/t % 0.4 0.41 0.4
0.08 0.06 0.07
Zn %
Ag g/t
CuEq %
Cu Mt
Mo Mt
0.04 0.03 0.04
17.94 13.23 15.10
1.48 1.40 1.43
2.8 2.93 5.73
0.11 0.116 0.22
Metal Contained Au Ag Moz Moz 3.98 4.47 8.45
179.3 186.2 369.9
All mineral reserves are determined according to the CIM standard specified in Canadian National Standard 43-101
Mineral reserves are estimated based on the following mining and economic factors: open-pit mining: a)
mining methods use a 2% dilution factor and a 98% mining recovery rate;
b)
The overall open pit slope is 43 degrees;
c)
Copper price at $4.66 per pound;
- 18 -
Pb Kt
Zn Kt
0.26 0.20 0.45
0.13 0.09 0.24
MANAGEMENT’S DISCUSSION AND ANALYSIS d)
Overall copper processing and recovery rate is 85%;
e)
Cutoff grade at 0.3% Cu.
Underground mining:
a)
Mining dilution by 12%;
b)
Mining losses by 15%;
c)
Beneficiation yield of 85%;
d)
Cutoff grade at 0.5% Cu.
Mineral reserves: Open-pit copper equivalent grade 0.61% CuEq, underground copper equivalent grade l.61% CuEq; CuEq = Cu+0.01Ag+1.69Mo+0.79Au +0.23Pb+0.26*Zn; Cu, 4.66 USD/lbs, Mo, 20 USD/lbs, Ag,40USD/oz Au, 2890 USD/oz, Pb, 1.1 USD/lbs, Zn, 1.4 USD/lbs;
The mineral reserve estimate was prepared by Dr. Siwei He, an external consultant at Changchun Gold Design Institute Co., Ltd. He is a qualified QP under the Canadian NI43-101 standard.
LIQUIDITY AND CAPITAL RESOURCES The Company operates in a capital intensive industry. The Company’s liquidity requirements arise principally from the need for financing its mining and mineral processing operations, exploration activities and acquisition of exploration and mining rights. The Company’s principal sources of funds have been proceeds from borrowings from commercial banks, corporate bonds financing, equity financings, and cash generated from operations. The Company’s liquidity primarily depends on its ability to generate cash flow from its operations and to obtain external financing to meet its debt obligations as they become due, as well as the Company’s future operating and capital expenditure requirements. At June 30, 2026, the Company had an accumulated surplus of US$1.1 billion, working capital of US$909.9 million and borrowings of US$463.3 million. The Company’s cash balance at June 30, 2026 was US$1.03 billion, among which cash and cash equivalents was US$586.4 million, Restricted cash was US$43.5 million, term deposits was US$403.8 million. Management believes that its forecast operating cash flows are sufficient to cover the next twelve months of the Company’s operations including its planned capital expenditures and current debt repayments. The Company’s borrowings are comprised of US$169.1 million of short term debt facilities with interest rates ranging from 1.25% to 4.16% per annum arranged through various banks. In addition, on November 3, 2015, the Company entered into a Loan Facility agreement with a syndicate of banks, led by Bank of China. The lenders agreed to lend an aggregate principal amount of RMB3.98 billion, approximately US$613 million with the initial interest rate of 2.83% per annum. The proceeds from the Loan Facility are to be used for the development of the Jiama Mine. The loan is secured by the mining rights for the Jiama Mine. As of June 30, 2026 the Company has fully drawn under this Facility. The outstanding loan balance is RMB1.27 billion (approximately US$186 million), bearing an annual interest rate of 1.5% maturing on November 5, 2029. On April 29, 2020, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB1.4 billion (approximately US$197.8 million). As of June 30, 2026, the Company has fully drawn down under this facility. The outstanding loan balance is RMB809 million (approximately US$119 million), bearing an annual interest rate of 1.6%, with maturity on April 28, 2034.
- 19 -
MANAGEMENT’S DISCUSSION AND ANALYSIS On August 8, 2025, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB2.1 billion (approximately US$294 million).As of June 30, 2026, the Company has drawn down RMB50 million (approximately US$7.2 million) under this facility, bearing an annual interest rate of 1.5%, with maturity on June 21, 2030. On November 9, 2023, the Company obtained a bilateral loan with an aggregate principal amount of RMB100 million (approximately US$14.1 million) from China Construction Bank at an annual interest rate of 1.25%. As of June 30, 2026, the outstanding loan balance was RMB88 million (approximately US$12.9 million). On May 13, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million (approximately US$28.2 million) from Lhasa Chengguan District Sub branch of Agricultural Bank of China Co., Ltd. at an annual interest rate of 1.35% for a term of 3 years. As of June 30, 2026, the outstanding loan balance was RMB60 million (approximately US$8.8 million). On August 20, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million (approximately US$28.04 million) from China Gold Finance Co., Ltd. at an annual interest rate of 2.45% for a term of 3 years. As of June 30, 2026, the outstanding loan balance was RMB180 million (approximately US$26.0 million). On May 12, 2026, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$64 million from China Construction Bank (Asia) Corporation Limited, bearing interest at a floating rate based on Term SOFR. On June 9, 2026, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$10 million from China Everbright Bank Co., Ltd., Hong Kong Branch, bearing interest at a floating rate based on Term SOFR. The Company believes that the availability of debt financing in China at favorable rates will continue for the foreseeable future. The Company continues to review and assess its assets for impairment as part of its financial reporting processes. To date, the assessment carried out by the Company support the carrying values of the Company’s assets and no impairment has been required. However, the management of the Company continues to evaluate key assumptions on estimates and management judgements in order to determine the recoverable amount of the CSH Mine and the Jiama Mine.
CASH FLOWS The following table sets out selected cash flow data from the Company’s consolidated cash flow statements for the three and six months ended June 30, 2026 and June 30, 2025. Three months ended June 30,
Six months ended June 30,
2026 US$’000
2025 US$’000
2026 US$’000
2025 US$’000
Net cash from operating activities Net cash used in investing activities Net cash (used in) financing activities Net (decrease) increase in cash and cash equivalents Effect of foreign exchange rate changes on cash and cash equivalents Cash and cash equivalents, beginning of period
286,477 (45,978) (265,433)
191,318 (45,687) (77,837)
555,180 (110,842) (271,388)
334,848 (132,380) (78,172)
(24,934)
67,794
172,950
124,296
7,913 603,438
909 240,492
14,065 399,402
1,120 183,779
Cash and cash equivalents, end of period
586,417
309,195
586,417
309,195
- 20 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Operating cash flow For the three months ended June 30, 2026, net cash inflow from operating activities was US$286.5 million which is primarily attributable (i) profit before income tax of US$312.8 million (ii) depreciation of property, plant and equipment of US$31.9 million and (iii) amortization of mining rights of US$13.8 million, partially offset by and (i) income tax paid of US$44.3 million, (ii) increase in trade and other receivables of US$10.8 million and (iii) decrease in contract liabilities of US$9.9 million. For the six months ended June 30, 2026, net cash inflow from operating activities was US$555.2 million which is primarily attributable (i) profit before income tax of US$580.0 million (ii) depreciation of property, plant and equipment of US$62.1 million and (iii) decrease in inventories of US$22.7 million, partially offset by (i) income tax paid of US$64.4 million, (ii) increase in trade and other receivables of US$13.8 million and (iii) decrease in trade and other payables of US$12.3 million.
Investing cash flow For the three months ended June 30, 2026, the net cash outflow from investing activities was US$46.0 million which is primarily attributable to (i) placement of term deposits of US$146.7 million and (ii) payment for acquisition of property, plant and equipment of US$6.7 million, offset by (i) redemption of term deposits of US$110.0 million and (ii) interest income received of US$2.5 million. For the six months ended June 30, 2026, the net cash outflow from investing activities was US$110.8 million which is primarily attributable to (i) placement of term deposits of US$348.2 million and (ii) payment for acquisition of property, plant and equipment of US$22.8 million, offset by (i) redemption of term deposits of US$261.1 million and (ii) interest income received of US$4.0 million.
Financing cash flow For the three months ended June 30, 2026, the net cash outflow mainly from financing activities was US$265.4 million which is primarily attributable to (i) dividends paid to shareholders of US$186.3 million and (ii) repayment of bank and other borrowings of US$108.7 million. For the six months ended June 30, 2026, the net cash outflow mainly from financing activities was US$271.4 million which is primarily attributable to (i) dividends paid to shareholders of US$186.3 million and (ii) repayment of bank and other borrowings of US$113.7 million.
Expenditures Incurred For the six months ended June 30, 2026, the Company incurred mining costs of US$25.5 million, mineral processing costs of US$54.4 million and transportation costs of US$1.5 million.
Gearing ratio Gearing ratio is defined as the ratio of consolidated total debt to consolidated total equity. As at June 30, 2026, the Company’s total debt was US$463.3 million and the total equity was US$2,661.4 million. The Company’s gearing ratio was therefore 0.17 as at June 30, 2026 compared to 0.22 as at March 31, 2026.
- 21 -
MANAGEMENT’S DISCUSSION AND ANALYSIS SIGNIFICANT INVESTMENTS, ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES. ASSOCIATES AND JOINT VENTURES, AND FUTURE PLAN FOR MATERIAL INVESTMENTS OF CAPITAL ASSETS Other than as disclosed elsewhere in this MD&A or in the condensed consolidated financial statements for the six months ended June 30, 2026, there were no significant investments held by the Company, nor were there any material acquisitions or disposals of subsidiaries, associates and joint ventures during the six months ended June 30, 2026. Other than as disclosed in this MD&A, there was no plan authorized by the Board for other material investments or additions of capital assets at the date of this MD&A.
CHARGE ON ASSETS Other than as disclosed elsewhere in this MD&A and condensed consolidated financial statements, none of the Company’s assets were pledged as at June 30, 2026.
EXPOSURE TO FLUCTUATIONS IN EXCHANGE RATES AND RELATED HEDGES The Company is exposed to the financial risk related to the fluctuation of foreign exchange rates for the monetary assets and liabilities denominated in the currencies other than the functional currencies to which they relate. The Company has not hedged its exposure to currency fluctuation. However, the Management monitors foreign exchange exposure and will consider hedging significant foreign currency exposure should the need arise. Refer to Note 33, Financial Instruments, in the annual consolidated financial statements for the year ended December 31, 2025.
COMMITMENTS Commitments include principal payments on the Company’s bank loans and syndicated loan facility, corporate bonds, and capital commitments in respect of the future acquisition of property, plant and equipment and construction for both the CSH Mine and the Jiama Mine. The Company’s capital commitments relate primarily to the payments for purchase of equipment and machinery for both mines and payments to third-party contractors for the provision of mining and exploration engineering work and mine construction work for both mines. The Company has entered into contracts that prescribe such capital commitments; however, liabilities relating to them have not yet been incurred. Refer to Note 34, Commitments, in the annual consolidated financial statements for the year ended December 31, 2025. The following table outlines payments for commitments for the periods indicated:
Principal repayment of bank loans Entrusted loan payable
Total US$’000
Within One year US$’000
Within Two to five years US$’000
(a company incorporated under the laws of British Columbia, Canada with limited liability) (Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
RESULTS ANNOUNCEMENT FOR THE SIX MONTHS ENDED JUNE 30, 2026 FINANCIAL HIGHLIGHTS 2026 2025 For the six months ended June 30, US$’000 US$’000 Revenue Net income (Loss) Basic earnings (loss) per share (cents) Net cash flows from operations Property, plant and equipment Property, plant and equipment capital expenditures Cash and cash equivalents Working capital
914,216 512,124 127.99
580,365 202,322 50.53
555,180 1,338,153 22,774 586,417 909,894
334,848 1,327,224 29,301 309,195 353,863
RESULTS The board of directors (the “Board”) of China Gold International Resources Corp. Ltd. (the “Company” together with its subsidiaries, referred hereto as the “Group”) is pleased to announce the condensed consolidated results of the Group for the three and six months ended June 30, 2026 with comparative figures for the comparable period in 2025, as follows:
-1-
MANAGEMENT’S DISCUSSION AND ANALYSIS Management’s Discussion and Analysis of Financial Condition and Results of Operations for the three and six months ended June 30, 2026. (Stated in U.S. dollars, except as otherwise noted)
FORWARD-LOOKING STATEMENTS THE COMPANY
1 2
OVERVIEW
2
PERFORMANCE HIGHLIGHTS
2
OUTLOOK
3
RESULTS OF OPERATIONS
5
SELECTED QUARTERLY FINANCIAL DATA
5
SELECTED QUARTERLY AND ANNUAL PRODUCTION DATA AND ANALYSIS
5
REVIEW OF QUARTERLY AND ANNUAL DATA
7
NON-IFRS MEASURES
9
MINERAL PROPERTIES
11
THE CSH MINE
11
THE JIAMA MINE
13
LIQUIDITY AND CAPITAL RESOURCES
17
CASH FLOWS
18
OPERATING CASH FLOW
19
INVESTING CASH FLOW
19
FINANCING CASH FLOW
19
EXPENDITURES INCURRED
19
GEARING RATIO
19
SIGNIFICANT INVESTMENTS, ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES. ASSOCIATES AND JOINT VENTURES, AND FUTURE PLAN FOR MATERIAL INVESTMENTS OF CAPITAL ASSETS
20
CHARGE ON ASSETS
20
EXPOSURE TO FLUCTUATIONS IN EXCHANGE RATES AND RELATED HEDGES
20
COMMITMENTS
20
RELATED PARTY TRANSACTIONS
21
PROPOSED TRANSACTIONS
22
CRITICAL ACCOUNTING ESTIMATES
22
CHANGE IN ACCOUNTING POLICIES
22
FINANCIAL INSTRUMENTS AND OTHER INSTRUMENTS
22
OFF-BALANCE SHEET ARRANGEMENTS
22
DIVIDEND AND DIVIDEND POLICY
22
OUTSTANDING SHARES
23
DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING
23
RISK FACTORS
23
QUALIFIED PERSON
23
ADDITIONAL INFORMATION
23
-2-
MANAGEMENT’S DISCUSSION AND ANALYSIS The following Management Discussion and Analysis of financial condition and results of operations (“MD&A”) is prepared as of August 13, 2026. It should be read in conjunction with the consolidated financial statements and notes thereto of China Gold International Resources Corp. Ltd. (referred to herein as “China Gold International”, the “Company”, “we” or “our” as the context may require) for the three and six months ended June 30, 2026 and the three and six months ended June 30, 2025, respectively. Unless the context otherwise provides, references in this MD&A to China Gold International or the Company refer to China Gold International and each of its subsidiaries collectively on a consolidated basis. The following discussion contains certain forward-looking statements relating to the Company’s plans, objectives, expectations and intentions, which are based on the Company’s current expectations and are subject to risks, uncertainties and changes in circumstances. Readers should carefully consider all of the information set out in this MD&A, including the risks and uncertainties outlined further in the Company’s Annual Information Form (“Annual Information Form” or “AIF”) dated March 30, 2026 on SEDAR+ at www.sedarplus.ca, www.chinagoldintl.com and www.hkex.com.hk. For further information on risks and other factors that could affect the accuracy of forward-looking statements and the result of operations of the Company, please refer to the sections titled “Forward-Looking Statements” and “Risk Factors” and to discussions elsewhere within this MD&A. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks.
FORWARD-LOOKING STATEMENTS Certain statements made herein, other than statements of historical fact relating to the Company, represent forward-looking information. In some cases, this forward-looking information can be identified by words or phrases such as “may”, “will”, “expect”, “anticipate”, “contemplates”, “aim”, “estimate”, “intend”, “plan”, “believe”, “potential”, “continue”, “is/are likely to”, “should” or the negative of these terms, or other similar expressions intended to identify forward-looking information. This forward-looking information includes, among other things; China Gold International’s production estimates, business strategies and capital expenditure plans; the development and expansion plans and schedules for the CSH Mine and the Jiama Mine; China Gold International’s financial condition; the regulatory environment as well as the general industry outlook; general economic trends in China; and statements respecting anticipated business activities, planned expenditures, corporate strategies, participation in projects and financing, and other statements that are not historical facts. By their nature, forward-looking information involves numerous assumptions, both general and specific, which may cause the actual results, performance or achievements of China Gold International and/or its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward–looking information. Some of the key assumptions include, among others, the absence of any material change in China Gold International’s operations or in foreign exchange rates, the prevailing price of gold, copper and other non-ferrous metal products; the absence of lowerthan-anticipated mineral recovery or other production problems; effective income and other tax rates and other assumptions underlying China Gold International’s financial performance as stated in the Company’s technical reports for its CSH Mine and Jiama Mine; China Gold International’s ability to obtain regulatory confirmations and approvals on a timely basis; continuing positive labor relations; the absence of any material adverse effects as a result of political instability, terrorism, natural disasters, pandemics such as COVID-19, litigation or arbitration and adverse changes in government regulation; the availability and accessibility of financing to China Gold International; and the performance by counterparties of the terms and conditions of all contracts to which China Gold International and its subsidiaries are a party. The forward-looking information is also based on the assumption that none of the risk factors identified in this MD&A or in the AIF that could cause actual results to differ materially from the forward-looking information actually occurs.
-3-
MANAGEMENT’S DISCUSSION AND ANALYSIS Forward-looking information contained herein as of the date of this MD&A is based on the opinions, estimates and assumptions of management. There are a number of important risks, uncertainties and other factors that could cause actual actions, events or results to differ materially from those described as forward-looking information. China Gold International disclaims any obligation to update any forward-looking information, whether as a result of new information, estimates, opinions or assumptions, future events or results, or otherwise except to the extent required by law. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking information in this MD&A is expressly qualified by this cautionary statement. The reader is cautioned not to place undue reliance on forward-looking information.
THE COMPANY Overview China Gold International is a gold and base metal mining company registered in British Columbia, Canada. The Company’s main business involves the operation, acquisition, development and exploration of gold and base metal properties. The Company’s principal mining operations are the Chang Shan Hao Gold Mine (“CSH Mine” or “CSH”), located in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine (“Jiama Mine” or “Jiama”), located in Tibet, China. China Gold International holds a 96.5% interest in the CSH Mine, while its Chinese joint venture (“CJV”) partner holds the remaining 3.5% interest. The Company owns a 100% interest in the Jiama Mine, which hosts a large scale copper-gold polymetallic deposit containing copper, gold, molybdenum, silver, lead and zinc metals. China Gold International’s common shares are listed on the Toronto Stock Exchange (“TSX”) and The Stock Exchange of Hong Kong Limited (“HKSE”) under the symbol CGG and the stock code 2099, respectively. Additional information about the Company, including the Company’s Annual Information Form, is available on SEDAR+ at sedarplus.ca as well as Hong Kong Exchange News at hkexnews.hk.
Performance Highlights Three months ended June 30, 2026 •
Revenue increased by 50% to US$461.0 million from US$307.3 million for the same period in 2025.
•
Mine operating earnings of US$327.3 million, increased by US$167.9 million from mine operating earnings of US$159.4 million for the same period in 2025.
•
Net profit of US$275.8 million increased by US$159.5 million from US$116.3 million for the same period in 2025.
•
Cash flow from operation of US$286.5 million, increased from US$191.3 million for the same period in 2025.
•
Total gold production decreased by 14% to 37,498 ounces from 43,403 ounces for the same period in 2025.
•
Total copper production was 41.1 million pounds (approximately 18,641 tonnes) a slight increase from 39.7 million pounds (approximately 18,013 tonnes) for the same period in 2025.
-4-
MANAGEMENT’S DISCUSSION AND ANALYSIS Six months ended June 30, 2026 •
Revenue increased by 58% to US$914.2 million from US$580.4 million for the same period in 2025.
•
Mine operating earnings of US$620.1 million, increased by US$343.0 million from mine operating earnings of US$277.1 million for the same period in 2025.
•
Net profit of US$512.1 million increased by US$309.8 million from US$202.3 million for the same period in 2025.
•
Cash flow from operation of US$555.2 million, increased from US$334.8 million for the same period in 2025.
•
Total gold production decreased by 18% to 72,317 ounces from 88,200 ounces for the same period in 2025.
•
Total copper production was 78.6 million pounds (approximately 35,671 tonnes) a slight increase from 77.0 million pounds (approximately 34,924 tonnes) for the same period in 2025.
Outlook After the repairs and reinforcements of the overflow of the Guolanggou Tailings Dam, the Government of Tibet Autonomous Region and relevant departments of the central government approved the resumption of Jiama’s operations on May 30, 2024, with a daily processing capacity of 34,000 tonnes, which is lower than the design processing capacity. The Company is actively advancing the construction of the Youlongbu tailings storage facility (Phase III tailings pond), which is expected to be completed and put into operation by the end of 2027. The total daily processing capacity is anticipated to increase to 44,000 tpd once the Youlongbu tailings storage facility is in operation. The open-pit operations at the CSH gold mine are nearing the end of its mine life. To ensure stable production continuity, the Company is actively advancing the transition from open-pit to underground mining, with relevant construction works already commenced. With the CSH pit’s increased depth, the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. On May 22, 2026, a localized slope instability event occurred at CSH Gold Mine, which was a localized geological hazard primarily attributed to heavy rainfall in the area combined with complex geological conditions. Mining activities at the open pit remain temporarily suspended pending further geotechnical and operational assessment. Processing operations continue utilizing available low-grade ore stockpiles to maintain production. The Company is currently assessing the potential impact of the event on mining operations and future production plans. Based on the information currently available, the Company does not expect the event to materially affect its annual production guidance. Inconsideration of the events, the Company reports separate production guidance for the two mines in 2026.
CSH Mine: •
The total gold production is estimated between 70,732 ounces (2.2 tonnes) and 83,592 ounces (2.6 tonnes).
Jiama Mine: •
The copper production will be approximately between 140 million pounds (63,500 tonnes) and 149 million pounds (67,500 tonnes);
•
The gold production will be approximately between 70,732 ounces (2.2 tonnes) and 75,554 ounces (2.35 tonnes);
•
The silver production will be approximately between 4.18 million ounces (130 tonnes) and 4.82 million ounces (150 tonnes).
-5-
MANAGEMENT’S DISCUSSION AND ANALYSIS Outline of the Long-Term Development Plan for the Jiama Mine In 2024, the Company successfully restored stable operation at the Jiama Mine. In addition, the Company continued to focus its efforts on optimizing resource utilization plan, integrating the identified high-grade underground resources, and accelerating the exploration work at high potential zones. On June 30, 2026, the Company announced a transformational mineral resource update for the Jiama Mine, with measured mineral resource increased 523% and proven mineral reserve increased 1,170%. The long-term development plan for the Jiama Mine consists of three phases: •
Prior to the completion of the construction of the new tailings storage facility (the “Youlongbu tailings storage facility”), the Jiama Mine Phase II processing plant will maintain and operate at its current processing capacity of 34,000 tons per day to match the Guolanggou’s storage capacity (the operation of Phase I processing plant has been suspended since May 2024).
•
The Youlongbu tailings storage facility is scheduled to commence operation by the end of 2027, allowing a further increase in the Jiama Mine’s production capacity. Over the next two years, as part of the underground resource integration plan, the Company plans to apply to increase the permitted capacity on its mining license for the Jiama Mine, subject to compliance with the relevant safety requirements. Currently, the permitted capacity on the mining license of the Jiama Mine is 14.4 million tonnes per year (approximately 44,000 tonnes per day based on 330 operating days per year). Subject to the government approval of an increased annual mining rate, and following the commissioning of Youlongbu tailings storage facility, the Jiama Mine’s ore processing volume will return to the level of 50,000 tonnes per day, in line with the designed processing capacity of the processing plants. In addition, endeavors are underway so that the production levels at the Jiama Mine will restore to those before the Guolanggou tailings overflow through blending of high-grade underground ores.
•
The Company is also working to substantially expand the known mineralized system and delineate additional mineral resources and reserves at depth and in surrounding areas of the Jiama Mine, including the Zegulang North. The Company completed a NI 43-101 Technical Report on June 30, 2026 with the updated Mineral Resource, which significantly expands the Jiama Mine’s scale and development potential, providing a robust foundation for future production expansion, mine life extension and further technical studies on larger-scale mining scenarios. Subject to the final exploration outcomes and feasibility studies on resource development, the Company will formulate a comprehensive expansion plan for the Jiama Mine area. This study has already been initiated at a preliminary stage. The Company will provide an update on the progress and results in due course.
-6-
MANAGEMENT’S DISCUSSION AND ANALYSIS RESULTS OF OPERATIONS Selected Quarterly Financial Data Quarter ended 2025
2026 (US$ in thousands except per share) Revenue Cost of sales Mine operating earnings General and administrative expenses Exploration and evaluation expenditures Research and development expenses Income from operations Foreign exchange gain (loss) Finance costs Profit before income tax Income tax expense (credit) Net profit (loss) Basic & diluted earnings (loss) per share (cents)
2024
30-Jun
31-Mar
31-Dec
30-Sep
30-Jun
31-Mar
31-Dec
30-Sep
461,013 133,675 327,338 16,824 61 6,463 303,990 4,796 3,365 312,823 37,070 275,753
453,203 160,433 292,770 15,100 171 5,459 272,040 (2,464) 4,065 267,214 30,843 236,371
384,734 174,826 209,908 21,450 268 16,399 171,791 7,381 4,511 171,694 43,994 127,699
345,026 147,993 197,033 14,184 224 7,848 174,777 (3,039) 4,711 153,450 11,156 142,294
307,269 147,872 159,397 12,068 133 5,256 141,940 (2,037) 4,580 139,252 22,909 116,343
273,096 155,444 117,653 12,232 508 3,296 101,617 (2,654) 5,002 95,770 9,791 85,979
293,567 171,413 122,154 17,877 247 8,118 95,912 (4,631) 5,313 85,540 17,223 68,317
254,581 207,762 46,819 9,944 49 4,704 32,122 2,670 5,692 30,166 2,293 27,873
68.97
59.02
31.67
35.60
29.08
21.45
16.97
6.84
Selected Quarterly and Annual Production Data and Analysis CSH Mine
Gold sales (US$ million) Realized average price (US$) of gold per ounce Gold produced (ounces) Gold sold (ounces) Total production cost (US$ per ounce) Cash production cost(1) (US$ per ounce) (1)
Three months ended June 30,
Six months ended June 30
2026
2025
2026
2025
97.75 4,546 21,500 21,500 1,772 1,282
84.58 3,319 22,090 25,483 1,612 1,251
224.45 4,703 42,853 47,724 1,776 1,291
163.67 3,094 45,829 52,893 1,619 1,153
Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A
-7-
MANAGEMENT’S DISCUSSION AND ANALYSIS Gold production at the CSH Mine decreased by 3% to 21,500 ounces for the three months ended June 30, 2026 compared to 22,090 ounces for the same period in 2025. The total production cost of gold for the three months ended June 30, 2026 increased to US$1,772 per ounce compared to US$1,612 for the same period in 2025. The cash production cost of gold for the three months ended June 30, 2026 increased to US$1,282 per ounce from US$1,251 for the same period in 2025. Jiama Mine Copper sales (US$ in millions) Realized average price 1 (US$) of copper per pound after smelting fee discount 6 Copper produced (tonnes) Copper produced (pounds) Copper sold (tonnes) Copper sold (pounds) Gold produced (ounces) Gold sold (ounces) Silver produced (ounces) Silver sold (ounces) Lead produced (tonnes) Lead produced (pounds) Lead sold (tonnes) Lead sold (pounds) Zinc produced (tonnes) Zinc produced (pounds) Zinc sold (tonnes) Zinc sold (pounds) Moly produced (tonnes) Moly produced (pounds) Moly sold (tonnes) Moly sold (pounds) Total production cost 2 (US$) of copper per pound Total production cost 2 (US$) of copper per pound after by-products credits 4 Cash production cost 4 (US$) per pound of copper Cash production cost 3 (US$) of copper per pound after by-products credits 4 1
Three months ended June 30,
Six months ended June 30,
2026
2025
2026
2025
189.18
110.72
359.84
204.22
4.74 18,641 41,096,647 17,986 39,652,946 15,998 15,741 1,542,400 1,480,033 13,226 29,158,471 12,421 27,383,757 7,757 17,102,255 7,300 16,093,281 103 226,331 85 187,481
2.86 18,013 39,710,002 17,565 38,722,492 21,313 20,881 1,436,260 1,392,389 10,262 22,624,764 9,718 21,423,651 5,477 12,075,719 5,107 11,258,963 255 559,570 234 516,452
4.66 35,671 78,640,919 35,035 77,238,998 29,464 29,287 2,776,949 2,721,138 23,970 52,845,994 23,283 51,329,537 12,124 26,728,185 11,703 25,801,005 207 456,142 197 434,085
2.70 34,924 76,993,263 34,292 75,599,786 42,371 41,619 2,750,668 2,685,804 21,038 46,381,857 20,201 44,536,444 10,893 24,015,893 10,470 23,081,507 452 997,022 494 1,087,991
2.96
3.19
3.25
3.29
(1.38)
0.33
(0.98)
0.53
2.19
2.35
2.48
2.48
(2.16)
(0.49)
(1.75)
(0.28)
A discount factor of 11.9% to 25.3% is applied to the copper benchmark price to compensate the refinery costs incurred by the buyers. The discount factor is higher if the grade of copper in copper concentrate is below 18%. The industry standard of copper in copper concentrate is between 18-20%.
2
Production costs include expenditures incurred at the mine sites for the activities related to production including mining, processing, mine site G&A and royalties etc.
3
Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A.
4
By-products credit refers to the sales of gold, silver, lead, zinc and moly during the corresponding period.
5
Increased production of by-products combined with reduced G&A and R&D costs, has resulted in by-product credits exceeding total production cost of copper.
6
Due to the relatively high discount factor applied to mixed ore, the overall copper sales price decreased compared with the prior year.
-8-
MANAGEMENT’S DISCUSSION AND ANALYSIS During the three months ended June 30, 2026, The Jiama Mine produced 18,641 tonnes (approximately 41.1 million pounds) of copper, which increased from of 18,013 tonnes (approximately 39.7 million pounds) during the comparative three month period in 2025. Total production cost of copper per pound decreased by 7% in the second quarter of 2026 as compared to the same period in 2025. Cash production cost of copper per pound decreased by 7% as compared to the same quarter in 2025. Total production cost of copper per pound after by-products and cash production cost of copper per pound after by-product also decreased in 2026 as compared to the same three month period in 2025, mainly due to higher by-product revenue from gold and silver.
Review of Quarterly and Annual Data Three months ended June 30, 2026 compared to three months ended June 30, 2025 Revenue of US$461.0 million for the second quarter of 2026, increased by US$153.7 million from US$307.3 million for the same period in 2025. Revenue from the CSH Mine was US$97.8 million, an increase of US$13.2 million from US$84.6 million for the same period in 2025. The realized average gold price increased by 37%, from US$3,319/oz in Q2 2025 to US$4,546/oz in Q2 2026. Gold sold by the CSH Mine was 21,500 ounces (gold produced: 21,500 ounces), compared to 25,483 ounces (gold produced: 22,090 ounces) for the same period in 2025. Revenue from the Jiama Mine was US$363.3 million, an increase of US$140.6 million, compared to US$222.7 million for the same period in 2025. The realized average price of copper increased by 66%, from US$2.86/pound in Q2 2025 to US$4.74/pound in Q2 2026. Total copper sold was 17,986 tonnes (39.7 million pounds) for the three months ended June 30, 2026, an increase of 2% from 17,564 tonnes (38.7 million pounds) for the same period in 2025. Cost of sales of US$133.7 million for the quarter ended June 30, 2026, a decrease of US$14.2 million from US$147.9 million for the same period in 2025. Cost of sales as a percentage of revenue for the Company decreased from 48% to 29% for the three months ended June 30, 2025 and 2026, respectively. Cost of sales was impacted by many operation factors such as grade of ore, recovery rates and stripping ratio. Refer to the sections below for details of production factors for each individual mine. Mine operating earnings of US$327.3 million for the three months ended June 30, 2026, an increase of US$167.9 million from US$159.4 million for the same period in 2025. General and administrative expenses increased by US$4.7 million, from US$12.1 million for the quarter ended June 30, 2025 to US$16.8 million for the quarter ended June 30, 2026, partially due to higher taxes and surcharges resulting from increased revenue in the current quarter. Research and development expenses of US$6.5 million for the three months ended June 30, 2026, increased from US$5.3 million for the comparative period in 2025. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes. Income from operations of US$304.0 million for the second quarter of 2026, increased by US$162.1 million, compared to US$141.9 million for the same period in 2025. Foreign exchange gain of US$4.8 million for the three months ended June 30, 2026, increased from a loss of US$2.0 million for the same period in 2025. The gain was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB.
-9-
MANAGEMENT’S DISCUSSION AND ANALYSIS Interest and other income of US$7.4 million for the three months ended June 30, 2026, increased from US$4.9 million for the same period in 2025, primarily due to higher interest income earned during the current quarter compared to the corresponding period last year. In addition, the Company recognized dividend income of US$2.9 million from China Nonferrous Mining Corporation Limited during the current quarter. Finance costs of US$3.4 million for the three months ended June 30, 2026, decreased by US$1.2 million compared to US$4.6 million for the same period in 2025. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Income tax expense of US$37.1 million for the three months ended June 30, 2026, increased by US$14.2 million from US$22.9 million for the comparative period in 2025. During the current quarter, the Company recorded deferred tax credit of US$8.2 million, compared to an expense of US$7.1 million for the same period in 2025. Net income of US$275.8 million for the three months ended June 30, 2026, increased by US$159.5 million from US$116.3 million for the three months ended June 30, 2025.
Six months ended June 30, 2026 compared to six months ended June 30, 2025 Revenue of US$914.2 million for the first half of 2026, increased by US$333.8 million from US$580.4 million for the same period in 2025. Revenue from the CSH Mine was US$224.5 million, an increase of US$60.8 million from US$163.7 million for the same period in 2025. The realized average gold price increased by 52%, from US$3,094/oz in the first six months of 2025 to US$4,703/oz in the same period of 2026. Gold sold by the CSH Mine was 47,724 ounces (gold produced: 42,853 ounces), compared to 52,893 ounces (gold produced: 45,829 ounces) for the same period in 2025. Revenue from the Jiama Mine was US$689.8 million, an increase of US$273.1 million, compared to US$416.7 million for the same period in 2025. The realized average price of copper increased by 73%, from US$2.70/pound in the first six months of 2025 to US$4.66/pound in the same period of 2026. Total copper sold was 35,035 tonnes (77.2 million pounds) for the six months ended June 30, 2026, an increase of 2% from 34,292 tonnes (75.6 million pounds) for the same period in 2025. Cost of sales of US$294.1 million for the six months ended June 30, 2026, a decrease of US$9.2 million from US$303.3 million for the same period in 2025. Cost of sales as a percentage of revenue for the Company decreased from 52% to 32% for the six months ended June 30, 2025 and 2026, respectively. Cost of sales was impacted by many operation factors such as grade of ore, recovery rates and stripping ratio. Refer to the sections below for details of production factors for each individual mine. Mine operating earnings of US$620.1 million for the six months ended June 30, 2026, an increase of US$343.0 million from US$277.1 million for the same period in 2025. General and administrative expenses increased by US$7.6 million, from US$24.3 million for the six months ended June 30, 2025 to US$31.9 million for the six months ended June 30, 2026, partially due to higher taxes and surcharges resulting from increased revenue in the current period. Research and development expenses of US$11.9 million for the six months ended June 30, 2026, increased from US$8.6 million for the comparative period in 2025. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes. Income from operations of US$576.0 million for the six months ended June 30, 2026, increased by US$332.4 million, compared to US$243.6 million for the same period in 2025.
- 10 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Foreign exchange gain of US$2.3 million for the six months ended June 30, 2026, increased from a loss of US$4.7 million for the same period in 2025. The gain was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB. Interest and other income of US$9.1 million for the six months ended June 30, 2026, increased from US$6.7 million for the same period in 2025, primarily due to higher interest income earned during the current period compared to the corresponding period last year. In addition, the Company recognized dividend income of US$2.9 million from China Nonferrous Mining Corporation Limited during the current period. Finance costs of US$7.4 million for the six months ended June 30, 2026, decreased by US$2.2 million compared to US$9.6 million for the same period in 2025. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Income tax expense of US$67.9 million for the six months ended June 30, 2026, increased by US$35.2 million from US$32.7 million for the comparative period in 2025. During the current period, the Company recorded deferred tax credit of US$10.7 million, compared to a deferred tax expense of US$4.5 million for the same period in 2025. Net income of US$512.1 million for the six months ended June 30, 2026, increased by US$309.8 million from US$202.3 million for the six months ended June 30, 2025.
NON-IFRS MEASURES The cash cost of production, cash cost after by-product credits and cash cost per ounce and per pound are measures that are not in accordance with IFRS. The Company has included these metrics to supplement its consolidated financial statements, which are presented in accordance with IFRS. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance, operating results or financial condition prepared in accordance with IFRS. The Company has included cash production cost per ounce and per pound data because it understands that certain investors use this information to determine the Company’s ability to generate earnings and cash flow. The measures are not necessarily indicative of operating results, cash flow from operations, or financial condition as determined under IFRS. The following tables provide a reconciliation of cost of sales to the cash costs of production in total dollars and in dollars per gold ounce for the CSH Mine or per copper pound for the Jiama Mine:
- 11 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Cash production cost for gold is calculated as total cost of sales adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of gold per ounce is calculated as total cash production cost divided by total gold sold (ounces). CSH Mine (Gold)
Three months ended June 30, 2026
Total Cost of sales Adjustment – Depreciation & depletion Adjustment – Amortization of intangible assets Total cash production costs
38,092,089 (10,224,780)
2026
2025 US$ Per ounce
US$ 1
Six months ended June 30, US$ Per ounce
US$
1,772 41,083,590 (476) (9,042,823)
2025 US$ Per ounce
US$
1,612 84,755,534 (355) (22,721,182)
US$
US$ Per ounce
1,776 85,622,391 (476) (24,217,957)
1,619 (458)
(302,605)
(14)
(158,213)
(6)
(421,367)
(9)
(415,399)
(8)
27,564,704
1,282
31,882,554
1,251
61,612,985
1,291
60,989,035
1,153
21,500
Total Gold sold ounces
47,724
25,483
52,893
Cash production cost of gold US$ per ounce calculated as total cash production cost divided by total gold sold ounces. Cash Production cost for copper is calculated as production costs (total cost of sales adjusted by General and administrative expenses and Research and development expenses) adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of copper (pounds) is calculated as total cash production cost divided by total copper sold (pounds). Jiama Mine (Copper with by-products credits)
Three months ended June 30, 2026 US$
Six months ended June 30, 2026
2025 US$ Per Pound
US$
US$ Per Pound
US$
2025 US$ Per Pound
US$
US$ Per Pound
2.71 217,692,307
2.88
0.39 0.15
22,317,829 8,552,476
0.30 0.11
Total Cost of sales
95,582,050
2.41 106,787,363
2.76 209,352,054
General and administrative expenses Research and development expenses
15,604,438 6,462,465
0.39 0.16
0.29 0.14
Total production cost
117,648,953
2.96 123,081,624
3.19 251,011,172
3.25 248,562,612
3.29
Adjustment – Depreciation & depletion Adjustment – Amortization of intangible assets
(24,050,180) (6,319,242)
(0.61) (25,244,711) (0.16) (7,184,749)
(0.65) (47,207,459) (0.19) (12,266,193)
(0.61) (47,845,864) (0.16) (13,933,658)
(0.63) (0.18)
Total cash production costs
87,279,531
2.19
90,652,164
2.35 191,537,520
2.48 186,783,090
2.48
By-products credits
(172,408,019)
(4.35) (110,149,983)
(2.84) (326,616,518)
(4.23) (208,730,753)
(2.76)
Total cash production costs after by-products credits (85,128,488)
(2.16) (19,497,820)
(0.49) (135,078,998)
(1.75) (21,947,663)
(0.28)
Total Copper sold pounds
11,037,384 5,256,877
39,652,946
29,737,365 11,921,753
38,722,492
Cash production cost of copper US$ per pound calculated as total cash production cost divided by total copper sold pounds.
- 12 -
77,238,998
75,599,786
MANAGEMENT’S DISCUSSION AND ANALYSIS MINERAL PROPERTIES The CSH Mine The CSH Mine is located in Inner Mongolia Autonomous Region of China (Inner Mongolia). The property hosts two lowgrade, near surface gold deposits, along with other mineralized prospects. The main deposit is called the Northeast Zone (the “Northeast Zone”), while the second, smaller deposit is called the Southwest Zone (the “Southwest Zone”). The CSH Mine is owned and operated by Inner Mongolia Pacific Mining Co. Limited, a Chinese Joint Venture in which the Company holds a 96.5% interest and Ningxia Nuclear Industry Geological Exploration Institution holds the remaining 3.5%. The CSH Mine is an open-pit mining operations with a designed mining and processing capacity of 60,000 tpd. In July 2019, CSH updated its mine plan based on a result of latest ultimate limit optimization, in which the production rate was reduced to 40,000 tpd with a life of mine (“LoM”) of seven years as of 2019. The run-of-mine ore is heap leached with cyanide solution to extract gold and electro-winned to produce a gold dore which is sold to refiners. In June 2020, the operation of southwest pit ended. The open-pit operations at the CSH gold mine are nearing the end of its mine life. With the increase in the pit’s depth, the height and exposed area of the pit wall have increased, and the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. Ensuring slope stability and avoiding systematic risks at this stage is the Company’s top priority to ensure safe and sustainable production. The Company continues to evaluate the potential for underground operations. The major new contracts entered into during the six months ended June 30, 2026:
Item No. Contract Name 1
2
Subject amount (US $ millions)
Counterpart
Construction Contract for the Ventilation and Drainage Systems China Gold Group Construction of the Haoyao’erhudong Gold Mine Annual 8.25 Million Metric Corporation Limited Tonne Gold Ore Mining Project (Conversion from Open-Cast to Underground Mining) Inner Mongolia Pacific.Mining and stripping procedure of open-pit China Gold Group Construction for the 2026-2028 period Corporation Limited
Contract period (effective day and expiration date) Date of Contract
18.54 2026.4.26-2029.12.31
2026.3.3
55.57
2026.3.6
2026.1.1-2028.12.31
Production Update CSH Mine
Ore mined and placed on pad (tonnes) Average ore grade (g/t) Recoverable gold (ounces) Ending gold in process (ounces) Waste rock mined (tonnes)
Three months ended June 30,
Six months ended June 30,
2026
2025
2026
2025
2,056,705 0.52 20,386 133,259 339,698
3,388,465 0.48 30,882 155,295 1,608,233
3,790,743 0.53 38,090 133,259 1,311,846
6,097,924 0.50 58,817 155,295 3,911,422
For the three months ended June 30, 2026, the total amount of ore placed on the leach pad was 2.1 million tonnes, with total contained gold of 20,386 ounces (634.1 kilograms). The overall accumulative project-to-date gold recovery rate remained consistent at approximately 56.74% at the end of June 30, 2026 from 56.70% at the end of March 31, 2026. Of which, gold recovery from the phase I and phase II heap leach pads were 59.77% and 55.09% at June 30, 2026, respectively.
- 13 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Exploration There was no drilling or exploration program for the six months ended June 30, 2026 for the CSH Mine.
Mineral Resource Update CSH Mine Mineral Resources by category, at December 31, 2025 under NI 43-101 are listed below: Metal
Location Remaining within the open pit limit at a cut-off grade of 0.28 g/t Au Underground at a cut-off grade of 0.30 g/t Au
Mineral Resource Category
Tonnage (x1000 t)
Au (g/t)
Au (t)
Au (Moz)
Measured Indicated M+I Inferred Measured Indicated M+I Inferred
6,031 6,647 12,678 2,576 88,200 89,850 178,050 62,090
0.68 0.72 0.70 0.41 0.67 0.58 0.62 0.49
4.09 4.75 8.84 0.15 58.66 52.07 110.72 30.68
0.132 0.153 0.285 0.005 1.89 1.67 3.56 0.99
Note: Mineral Resources are reported in relation to a conceptual open-pit mining and underground block caving mining. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate. Raw assays have been capped. Mineral Resources include Mineral Reserves. Mineral Resources are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. Additional Mineral Resources are reported at a cut-off grade of 0.30 g/t Au for underground block caving mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce is equal to 31.1035 grams. The mineral resource estimates include Au only. CGME Consulting limited (CGME) has estimated the mineral resources of the CSH gold deposit based on a cut-off grade of 0.28 g/t Au within the optimized ultimate open-pit limit and a cut-off grade of 0.30 g/t Au below the open pit limit on April 1, 2022. The resource estimate was conducted using Ordinary Kriging, validated by Inversed Distance Squared method, and Micromine modelling software. CGME considers that blocks estimated for the first estimation pass with an average anisotropic distance to samples of less than 45 m can be classified as Measured Mineral Resources, and blocks estimated for the second estimation pass with an average anisotropic distance to samples of less than 80 m can be classified as Indicated Mineral Resources, and blocks estimated for the third estimation pass with an average anisotropic distance to samples of not more than 150 m can be categorised as Inferred Mineral Resources. For those Measured and Indicated Mineral Resource blocks, CGME considers that the degree of confidence is sufficient to allow an appropriate application of technical and economic parameters to support mine planning and to allow evaluation of the economic viability of the deposit, which is also adequate to support the open pit mining operations. In CGME’s opinion, the upper portions of gold mineralization at the CSH Gold Project are amenable to extraction by open pit mining with a cut-off grade optimised of 0.28 g/t Au, and the block caving mining operation would be the choice for extraction below the optimized open pit limits with a cut-off grade of 0.30 g/t Au in this estimation based on a Reasonable Prospect for Eventual Economic Extraction (“RPEEE”). It is noted that the partial mineral resources outside of the open pit limit but above the bottom plane may not be amenable to extraction in the future. Meanwhile, the mineral resources located below 840 m ASL at NE zone and 1,250 m ASL at SW zone may not be amendable to extraction in the future due to either excessive depth or high dilution. These mineral resources that may not be amendable to extraction in the future are excluded from the Mineral Resource Statement in this Report. Block model quantity and grade estimates for the CSH gold deposit were classified according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Yuan Chen, MSc., MAIG (M4014)/RPGeo (10262) (April 2022), an independent Qualified Person for the purposes of National Instrument 43-101 and updated by Mr. Yingting Guo, MMSA., PGeo., an independent Qualified Person for the purposes of National Instrument 43-101 on December 31, 2025.
- 14 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Mineral Reserves Update CSH Mine Mineral Reserves by category at December 31, 2025 under NI 43-101 are summarized below: Metal Type
T (x 1,000)
Diluted Au g/t
Au t
Au Moz
Proven Probable
6,405 7,222
0.64 0.67
4.11 4.87
0.13 0.16
Total
13,627
0.66
8.98
0.29
Note: Mineral Reserves are reported based on the optimized ultimate open pit limit. All figures are rounded to reflect the relative accuracy of the estimate. Mineral Reserves are included in Mineral Resources. Mineral Reserves are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,568 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce is equal to 31.1035 grams. The Proven Mineral Reserves are 6.41 Mt at a grade of 0.64 g/t Au for the gold content of 4.11 t or 0.13 Moz, and the Probable Mineral Reserves are 7.22 Mt at a grade of 0.67 g/t Au for the gold content of 4.87t or 0.16 Moz, totaling Mineral Reserves of 13.63 Mt at a grade of 0.66 g/t Au for the gold content of 8.98 t or 0.29 Moz. The Mineral Reserves for the CSH gold deposit were estimated according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Guangpian Zhang, AusIMM, a full time Principal Mining Engineer for CGME and a Qualified Person for the purposes of National Instrument 43-101.
The Jiama Mine Jiama is a large copper-gold polymetallic deposit containing copper, gold, silver, molybdenum, lead and zinc, located in the Gandise metallogenic belt in Tibet Autonomous Region of China. The Jiama Mine has both underground mining and open-pit mining operations. Phase I of the Jiama Mine commenced operation in the latter half of 2010 and reached its design capacity of 6,000 tpd in early 2011. Phase II of the Jiama Mine commenced mining operations in 2018 with 44,000 tpd design capacity. The combined mining and processing design capacity at the Jiama Mine is 50,000 tpd.
- 15 -
MANAGEMENT’S DISCUSSION AND ANALYSIS The major new contracts entered into during the six months ended June 30, 2026:
Item No. Contract Name 1
2
Subject amount (US $ millions)
Counterpart
Contract for the 110kV Transmission and China Energy Construction Transformation Project of Youlongbu Tailings Group Guangxi Hydropower Reservoir by Tibet Huatailong Mining Engineering Bureau Co., Ltd. Development Co., Ltd. Xizang Huatailong Mining Development Co., Yunnan Geological Survey Ltd. Underground Drilling Project Contract for Institute of Sinochem Jamang Mine Area, 2026-2028 Geological & Mining Bureau
5.68
3.90
Contract period (effective day and expiration date) 2026.02.04 – To be completed within 90 days of contract date 2026.04.07 – 2029.04.06
Date of Contract 2026.02.04
2026.04.07
Production Update Jiama Mine
Ore processed (tonnes) Average copper ore grade (%) Copper recovery rate (%) Average gold grade (g/t) Gold recovery rate (%) Average silver grade (g/t) Silver recovery rate (%) Average Lead grade (%) Lead recovery rate (%) Average Zinc grade (%) Zinc recovery rate (%) Average Moly grade (%) Moly recovery rate (%)
Three months ended June 30,
Six months ended June 30,
2026
2025
2026
2025
2,815,556 0.77 87 0.22 80 22.57 76 1.11 83.15 0.70 75.64 0.02 34
2,982,285 0.71 85 0.30 73 21.02 71 1.08 77.85 0.63 71.75 0.04 33
5,553,734 0.75 86 0.21 78 21.21 73 1.05 81.50 0.58 75.03 0.02 34
5,837,608 0.71 84 0.31 68 21.17 69 1.04 77.06 0.58 72.2 0.04 33
Exploration In 2026, Tibet Huatailong Mining Development Co., Ltd. plans to continue geological exploration projects in the peripheral of the Jiama mining area and the Bayi Ranch, with a planned 50,840 meters of surface drilling across 55 holes (including 6,000 meters of contingent drilling), 1:5,000 hydrogeological, engineering, and environmental geological mapping covering 40.77 square kilometers and 1:2,000 mapping covering 2.96 square kilometers in the outer area of the Jiama Mining area, and 1:2,000 geological mapping covering 4 square kilometers, 1:2,000 geological cross-section surveys spanning 4 kilometers, and 1:2,000 rock geochemical surveys covering 4 square kilometers at the Bayi Ranch. The estimated total budget is approximately US$17.2 million (RMB119.08 million). By the end of the second quarter of 2026, 5,081.6 meters of drilling with 9 holes has been completed for the carry-over drilling project in the peripheral area of Jiama mine. For the preparation of the new 2026 exploration project, the tendering works for all sub-projects have been completed. Nine rigs are currently being mobilized and ready for commencement. Of the ten prerequisite items related to land use procedures, seven have been completed, and the remaining three are in progress.
- 16 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Mineral Resources Estimate In June 30, 2026, Changchun Gold Design Institute (“CGDI) was engaged to prepare the updated mineral resources and reserve estimate on the Jiama mine by combining mineralized units together with lithology, a full three-dimensional (3D) solid and block models were constructed in the mineral resource estimation for the Jiama mine. The mineralization wireframes are defined using a cutoff grade of 0.3%. In Leapfrog, radial basis function interpolation (RBF interpolation) is used to create mineralized bodies (domains) based on copper grades in the combined samples and distinct molybdenum, gold, silver, lead, and zinc (where applicable). Block models of copper, molybdenum, and other metals, as well as specific gravity (SG), were modeled using the conventional Kriging method (OK) and local variable directivity (dynamic anisotropy). Mineral resource estimates are based on the Canada CIM Mineral Resources and Reserves Definition Standard, officially adopted on May 10, 2014, and then subsequent MRMR Best Practice Guide updated in 2019, as well as Canada NI43-101 “Mineral Project Standards and Disclosures,” (2012). Mineral resource estimates for Jiama project as of June 30, 2026 are summarized in table below:
Results of Mineral Resource Estimates for Jiama Mine at cutoff grade 0.3% Cu as of June 30, 2026* Category
Mass Mt
Cu %
Mo %
Ag g/t
Au g/t
Pb %
Zn %
Cu Mt
Mo Mt
Ag Moz
Au Moz
Pb kt
Zn kt
Measured Indicated M&I Inferred
623.1 711.9 1,335 454.7
0.71 0.68 0.69 0.65
0.03 0.03 0.03 0.03
13.16 12.10 12.60 12.53
0.29 0.29 0.29 0.28
0.08 0.06 0.07 0.12
0.04 0.03 0.04 0.05
4.38 4.77 9.15 2.99
0.21 0.23 0.44 0.13
263.59 277.03 540.62 183.22
5.77 6.67 12.45 4.04
478.80 426.45 905.25 525.79
268.39 230.17 498.55 205.66
*:
Mineral Reserves and Mineral Resources have been estimated as of 30 June 2026 in accordance with NI 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101) as required by Canadian securities regulatory authorities.
0.3% copper cut-off grade has been used to report the Mineral Resource Estimation (MRE).
Reported Mineral Resources contain no allowances for hanging wall or footwall contact boundary loss and dilution. No mining recovery has been applied.
The Mineral Resources was depleted to account for UG mining tunnel and mined-out, and current open-pit excluded.
Mineral Resources are reported inclusive of Mineral Reserves.
All Mineral Resource Estimates including Cu, Mo, Au, Ag, Pb, and Zn grade and their tonnages have been rounded to reflect the imprecise nature of the estimates for each classification category, therefore totals may not appear to sum correctly due to rounding.
Tony (Yingting) Guo, PhD, PGeo and Chaoxian (Ian) Zhou, MSc estimated the Mineral Resources. This Mineral Resource Estimation (MRE) was estimated with an effective date of 30 June 2026 and depleted to account for annual production up until 31 December 2025.
Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.
M, Measured, I, Indicated.
- 17 -
MANAGEMENT’S DISCUSSION AND ANALYSIS As of June 30, 2026, the total measured resources at the Jiama Mine mining area include 4.38 million tons of copper metal, with a grade of 0.71%; Molybdenum metal content was 0.21 million tons, grade 0.03%; Lead metal content was 0.48 million tons, grade 0.08%; Zinc metal content was 0.27 million tons, grade 0.04%; Associated gold metal content is 5.77 million ounces, grading 0.29g/t; Associated silver metallic content is 264 million ounces, with a grade of 13.16 g/t. Indicated resource of 4.77 million tons of copper metal, grade 0.68%; Molybdenum metal content was 0.23 million tons, grade 0.03%; Lead metal content was 0.43 million tons, grade 0.06%; Zinc metal content is 0.23 million tons, grade 0.03%; Gold metal content is 6.67 million ounces, with a grade of 0.29 g/t; Silver metallic content is 277 million ounces, with a grade of 12.10g/t. The inferred resource contains 2.99 million tons of copper metal, with the copper grade of 0.65%; Molybdenum metal content was 0.13 million tons, grade 0.03%; Lead metal content was 0.53 million tons, grade 0.12%; Zinc metal content was 0.21 million tons, grade 0.05%; Gold metal content is 4.04 million ounces, with a grade of 0.28 g/t; Silver metal content is 183 million ounces, with a grade of 12.53 g/t.
Mineral Reserves Estimate Updated mineral reserve estimates are based on the 2019 definition standards set by the Canadian Institute of Mines, Metallurgy and Petroleum (CIM). The mineral reserves of the Jiama Mine project were completed by CGDI. Reserve estimates are based on data and information up to December 31, 2025. Open-pit copper grade 0.3% and underground copper grade 0.5% as the cutoff grades were used for the mineral reserve estimate. The reserve estimate results are summarized in Table below: As of the June 30, 2026, the total proven mineral reserves under at Jiama Mine are 310.9 million tons of ore, containing 2.8 million tons of copper at a grade of 0.90%, 0.11 million tons of molybdenum at a grade of 0.035%, 3.98 million ounces of gold at a grade of 0.4 g/t, 179.3 million ounces of silver at a grade of 17.94 g/t, 0.26 million tons of lead at grade of 0.08% and 0.13 million tons of zinc at a grade of 0.04%. The total probable mineral reserves under at Jiama Mine are 340.3 million tons of ore, containing 2.93 million tons of copper at a grade of 0.86%, 0.116 million tons of molybdenum at a grade of 0.034%, 4.47 million ounces of gold at a grade of 0.41 g/t, 186.2 million ounces of silver at a grade of 13.23 g/t, 0.20 million tons of lead at grade of 0.06% and 0.09 million tons of zinc at a grade of 0.03%.
Mineral Reserves at Jiama Project as of June 30, 2026* Category
Ore Mt
Cu %
Mo %
Proven Probable Total
310.9 340.3 651.2
0.90 0.86 0.88
0.035 0.034 0.034
*:
Average Grade Au Pb g/t % 0.4 0.41 0.4
0.08 0.06 0.07
Zn %
Ag g/t
CuEq %
Cu Mt
Mo Mt
0.04 0.03 0.04
17.94 13.23 15.10
1.48 1.40 1.43
2.8 2.93 5.73
0.11 0.116 0.22
Metal Contained Au Ag Moz Moz 3.98 4.47 8.45
179.3 186.2 369.9
All mineral reserves are determined according to the CIM standard specified in Canadian National Standard 43-101
Mineral reserves are estimated based on the following mining and economic factors: open-pit mining: a)
mining methods use a 2% dilution factor and a 98% mining recovery rate;
b)
The overall open pit slope is 43 degrees;
c)
Copper price at $4.66 per pound;
- 18 -
Pb Kt
Zn Kt
0.26 0.20 0.45
0.13 0.09 0.24
MANAGEMENT’S DISCUSSION AND ANALYSIS d)
Overall copper processing and recovery rate is 85%;
e)
Cutoff grade at 0.3% Cu.
Underground mining:
a)
Mining dilution by 12%;
b)
Mining losses by 15%;
c)
Beneficiation yield of 85%;
d)
Cutoff grade at 0.5% Cu.
Mineral reserves: Open-pit copper equivalent grade 0.61% CuEq, underground copper equivalent grade l.61% CuEq; CuEq = Cu+0.01Ag+1.69Mo+0.79Au +0.23Pb+0.26*Zn; Cu, 4.66 USD/lbs, Mo, 20 USD/lbs, Ag,40USD/oz Au, 2890 USD/oz, Pb, 1.1 USD/lbs, Zn, 1.4 USD/lbs;
The mineral reserve estimate was prepared by Dr. Siwei He, an external consultant at Changchun Gold Design Institute Co., Ltd. He is a qualified QP under the Canadian NI43-101 standard.
LIQUIDITY AND CAPITAL RESOURCES The Company operates in a capital intensive industry. The Company’s liquidity requirements arise principally from the need for financing its mining and mineral processing operations, exploration activities and acquisition of exploration and mining rights. The Company’s principal sources of funds have been proceeds from borrowings from commercial banks, corporate bonds financing, equity financings, and cash generated from operations. The Company’s liquidity primarily depends on its ability to generate cash flow from its operations and to obtain external financing to meet its debt obligations as they become due, as well as the Company’s future operating and capital expenditure requirements. At June 30, 2026, the Company had an accumulated surplus of US$1.1 billion, working capital of US$909.9 million and borrowings of US$463.3 million. The Company’s cash balance at June 30, 2026 was US$1.03 billion, among which cash and cash equivalents was US$586.4 million, Restricted cash was US$43.5 million, term deposits was US$403.8 million. Management believes that its forecast operating cash flows are sufficient to cover the next twelve months of the Company’s operations including its planned capital expenditures and current debt repayments. The Company’s borrowings are comprised of US$169.1 million of short term debt facilities with interest rates ranging from 1.25% to 4.16% per annum arranged through various banks. In addition, on November 3, 2015, the Company entered into a Loan Facility agreement with a syndicate of banks, led by Bank of China. The lenders agreed to lend an aggregate principal amount of RMB3.98 billion, approximately US$613 million with the initial interest rate of 2.83% per annum. The proceeds from the Loan Facility are to be used for the development of the Jiama Mine. The loan is secured by the mining rights for the Jiama Mine. As of June 30, 2026 the Company has fully drawn under this Facility. The outstanding loan balance is RMB1.27 billion (approximately US$186 million), bearing an annual interest rate of 1.5% maturing on November 5, 2029. On April 29, 2020, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB1.4 billion (approximately US$197.8 million). As of June 30, 2026, the Company has fully drawn down under this facility. The outstanding loan balance is RMB809 million (approximately US$119 million), bearing an annual interest rate of 1.6%, with maturity on April 28, 2034.
- 19 -
MANAGEMENT’S DISCUSSION AND ANALYSIS On August 8, 2025, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB2.1 billion (approximately US$294 million).As of June 30, 2026, the Company has drawn down RMB50 million (approximately US$7.2 million) under this facility, bearing an annual interest rate of 1.5%, with maturity on June 21, 2030. On November 9, 2023, the Company obtained a bilateral loan with an aggregate principal amount of RMB100 million (approximately US$14.1 million) from China Construction Bank at an annual interest rate of 1.25%. As of June 30, 2026, the outstanding loan balance was RMB88 million (approximately US$12.9 million). On May 13, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million (approximately US$28.2 million) from Lhasa Chengguan District Sub branch of Agricultural Bank of China Co., Ltd. at an annual interest rate of 1.35% for a term of 3 years. As of June 30, 2026, the outstanding loan balance was RMB60 million (approximately US$8.8 million). On August 20, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million (approximately US$28.04 million) from China Gold Finance Co., Ltd. at an annual interest rate of 2.45% for a term of 3 years. As of June 30, 2026, the outstanding loan balance was RMB180 million (approximately US$26.0 million). On May 12, 2026, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$64 million from China Construction Bank (Asia) Corporation Limited, bearing interest at a floating rate based on Term SOFR. On June 9, 2026, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$10 million from China Everbright Bank Co., Ltd., Hong Kong Branch, bearing interest at a floating rate based on Term SOFR. The Company believes that the availability of debt financing in China at favorable rates will continue for the foreseeable future. The Company continues to review and assess its assets for impairment as part of its financial reporting processes. To date, the assessment carried out by the Company support the carrying values of the Company’s assets and no impairment has been required. However, the management of the Company continues to evaluate key assumptions on estimates and management judgements in order to determine the recoverable amount of the CSH Mine and the Jiama Mine.
CASH FLOWS The following table sets out selected cash flow data from the Company’s consolidated cash flow statements for the three and six months ended June 30, 2026 and June 30, 2025. Three months ended June 30,
Six months ended June 30,
2026 US$’000
2025 US$’000
2026 US$’000
2025 US$’000
Net cash from operating activities Net cash used in investing activities Net cash (used in) financing activities Net (decrease) increase in cash and cash equivalents Effect of foreign exchange rate changes on cash and cash equivalents Cash and cash equivalents, beginning of period
286,477 (45,978) (265,433)
191,318 (45,687) (77,837)
555,180 (110,842) (271,388)
334,848 (132,380) (78,172)
(24,934)
67,794
172,950
124,296
7,913 603,438
909 240,492
14,065 399,402
1,120 183,779
Cash and cash equivalents, end of period
586,417
309,195
586,417
309,195
- 20 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Operating cash flow For the three months ended June 30, 2026, net cash inflow from operating activities was US$286.5 million which is primarily attributable (i) profit before income tax of US$312.8 million (ii) depreciation of property, plant and equipment of US$31.9 million and (iii) amortization of mining rights of US$13.8 million, partially offset by and (i) income tax paid of US$44.3 million, (ii) increase in trade and other receivables of US$10.8 million and (iii) decrease in contract liabilities of US$9.9 million. For the six months ended June 30, 2026, net cash inflow from operating activities was US$555.2 million which is primarily attributable (i) profit before income tax of US$580.0 million (ii) depreciation of property, plant and equipment of US$62.1 million and (iii) decrease in inventories of US$22.7 million, partially offset by (i) income tax paid of US$64.4 million, (ii) increase in trade and other receivables of US$13.8 million and (iii) decrease in trade and other payables of US$12.3 million.
Investing cash flow For the three months ended June 30, 2026, the net cash outflow from investing activities was US$46.0 million which is primarily attributable to (i) placement of term deposits of US$146.7 million and (ii) payment for acquisition of property, plant and equipment of US$6.7 million, offset by (i) redemption of term deposits of US$110.0 million and (ii) interest income received of US$2.5 million. For the six months ended June 30, 2026, the net cash outflow from investing activities was US$110.8 million which is primarily attributable to (i) placement of term deposits of US$348.2 million and (ii) payment for acquisition of property, plant and equipment of US$22.8 million, offset by (i) redemption of term deposits of US$261.1 million and (ii) interest income received of US$4.0 million.
Financing cash flow For the three months ended June 30, 2026, the net cash outflow mainly from financing activities was US$265.4 million which is primarily attributable to (i) dividends paid to shareholders of US$186.3 million and (ii) repayment of bank and other borrowings of US$108.7 million. For the six months ended June 30, 2026, the net cash outflow mainly from financing activities was US$271.4 million which is primarily attributable to (i) dividends paid to shareholders of US$186.3 million and (ii) repayment of bank and other borrowings of US$113.7 million.
Expenditures Incurred For the six months ended June 30, 2026, the Company incurred mining costs of US$25.5 million, mineral processing costs of US$54.4 million and transportation costs of US$1.5 million.
Gearing ratio Gearing ratio is defined as the ratio of consolidated total debt to consolidated total equity. As at June 30, 2026, the Company’s total debt was US$463.3 million and the total equity was US$2,661.4 million. The Company’s gearing ratio was therefore 0.17 as at June 30, 2026 compared to 0.22 as at March 31, 2026.
- 21 -
MANAGEMENT’S DISCUSSION AND ANALYSIS SIGNIFICANT INVESTMENTS, ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES. ASSOCIATES AND JOINT VENTURES, AND FUTURE PLAN FOR MATERIAL INVESTMENTS OF CAPITAL ASSETS Other than as disclosed elsewhere in this MD&A or in the condensed consolidated financial statements for the six months ended June 30, 2026, there were no significant investments held by the Company, nor were there any material acquisitions or disposals of subsidiaries, associates and joint ventures during the six months ended June 30, 2026. Other than as disclosed in this MD&A, there was no plan authorized by the Board for other material investments or additions of capital assets at the date of this MD&A.
CHARGE ON ASSETS Other than as disclosed elsewhere in this MD&A and condensed consolidated financial statements, none of the Company’s assets were pledged as at June 30, 2026.
EXPOSURE TO FLUCTUATIONS IN EXCHANGE RATES AND RELATED HEDGES The Company is exposed to the financial risk related to the fluctuation of foreign exchange rates for the monetary assets and liabilities denominated in the currencies other than the functional currencies to which they relate. The Company has not hedged its exposure to currency fluctuation. However, the Management monitors foreign exchange exposure and will consider hedging significant foreign currency exposure should the need arise. Refer to Note 33, Financial Instruments, in the annual consolidated financial statements for the year ended December 31, 2025.
COMMITMENTS Commitments include principal payments on the Company’s bank loans and syndicated loan facility, corporate bonds, and capital commitments in respect of the future acquisition of property, plant and equipment and construction for both the CSH Mine and the Jiama Mine. The Company’s capital commitments relate primarily to the payments for purchase of equipment and machinery for both mines and payments to third-party contractors for the provision of mining and exploration engineering work and mine construction work for both mines. The Company has entered into contracts that prescribe such capital commitments; however, liabilities relating to them have not yet been incurred. Refer to Note 34, Commitments, in the annual consolidated financial statements for the year ended December 31, 2025. The following table outlines payments for commitments for the periods indicated:
Principal repayment of bank loans Entrusted loan payable
Total US$’000
Within One year US$’000
Within Two to five years US$’000
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock Code: 2099)
(Toronto Stock Code: CGG)
RESULTS ANNOUNCEMENT
FOR THE SIX MONTHS ENDED JUNE 30, 2026
FINANCIAL HIGHLIGHTS
20262025
For the six months ended June 30,
US$’000US$’000
Revenue914,216580,365
Net income (Loss)512,124202,322
Basic earnings (loss) per share (cents)127.9950.53
Net cash flows from operations555,180334,848
Property, plant and equipment1,338,1531,327,224
Property, plant and equipment capital expenditures22,77429,301
Cash and cash equivalents586,417309,195
Working capital909,894353,863
RESULTS
The board of directors (the “Board”) of China Gold International Resources Corp. Ltd. (the “Company”
together with its subsidiaries, referred hereto as the “Group”) is pleased to announce the condensed
consolidated results of the Group for the three and six months ended June 30, 2026 with comparative
figures for the comparable period in 2025, as follows:
- 1 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Management’s Discussion and Analysis of Financial Condition and Results of Operations for the three and six months ended June 30, 2026. (Stated in U.S. dollars, except as otherwise noted) FORWARD-LOOKING STATEMENTS1 THE COMPANY2 OVERVIEW2 PERFORMANCE HIGHLIGHTS2 OUTLOOK3 RESULTS OF OPERATIONS5 SELECTED QUARTERLY FINANCIAL DATA5 SELECTED QUARTERLY AND ANNUAL PRODUCTION DATA AND ANALYSIS5 REVIEW OF QUARTERLY AND ANNUAL DATA7 NON-IFRS MEASURES9 MINERAL PROPERTIES11 THE CSH MINE11 THE JIAMA MINE13 LIQUIDITY AND CAPITAL RESOURCES17 CASH FLOWS18 OPERATING CASH FLOW19 INVESTING CASH FLOW19 FINANCING CASH FLOW19 EXPENDITURES INCURRED19 GEARING RATIO19 SIGNIFICANT INVESTMENTS, ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES. ASSOCIATES AND JOINT VENTURES, AND FUTURE PLAN FOR MATERIAL INVESTMENTS OF CAPITAL ASSETS20 CHARGE ON ASSETS20 EXPOSURE TO FLUCTUATIONS IN EXCHANGE RATES AND RELATED HEDGES20 COMMITMENTS20 RELATED PARTY TRANSACTIONS21 PROPOSED TRANSACTIONS22 CRITICAL ACCOUNTING ESTIMATES22 CHANGE IN ACCOUNTING POLICIES22 FINANCIAL INSTRUMENTS AND OTHER INSTRUMENTS22 OFF-BALANCE SHEET ARRANGEMENTS22 DIVIDEND AND DIVIDEND POLICY22 OUTSTANDING SHARES23 DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING23 RISK FACTORS23 QUALIFIED PERSON23 ADDITIONAL INFORMATION23
- 2 -
MANAGEMENT’S DISCUSSION AND ANALYSIS The following Management Discussion and Analysis of financial condition and results of operations (“MD&A”) is prepared as of August 13, 2026. It should be read in conjunction with the consolidated financial statements and notes thereto of China Gold International Resources Corp. Ltd. (referred to herein as “China Gold International”, the “Company”, “we” or “our” as the context may require) for the three and six months ended June 30, 2026 and the three and six months ended June 30, 2025, respectively. Unless the context otherwise provides, references in this MD&A to China Gold International or the Company refer to China Gold International and each of its subsidiaries collectively on a consolidated basis. The following discussion contains certain forward-looking statements relating to the Company’s plans, objectives, expectations and intentions, which are based on the Company’s current expectations and are subject to risks, uncertainties and changes in circumstances. Readers should carefully consider all of the information set out in this MD&A, including the risks and uncertainties outlined further in the Company’s Annual Information Form (“Annual Information Form” or “AIF”) dated March 30, 2026 on SEDAR+ at www.sedarplus.ca, www.chinagoldintl.com and www.hkex.com.hk. For further information on risks and other factors that could affect the accuracy of forward-looking statements and the result of operations of the Company, please refer to the sections titled “Forward-Looking Statements” and “Risk Factors” and to discussions elsewhere within this MD&A. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks. FORWARD-LOOKING STATEMENTS Certain statements made herein, other than statements of historical fact relating to the Company, represent forward-looking information. In some cases, this forward-looking information can be identified by words or phrases such as “may”, “will”, “expect”, “anticipate”, “contemplates”, “aim”, “estimate”, “intend”, “plan”, “believe”, “potential”, “continue”, “is/are likely to”, “should” or the negative of these terms, or other similar expressions intended to identify forward-looking information. This forward-looking information includes, among other things; China Gold International’s production estimates, business strategies and capital expenditure plans; the development and expansion plans and schedules for the CSH Mine and the Jiama Mine; China Gold International’s financial condition; the regulatory environment as well as the general industry outlook; general economic trends in China; and statements respecting anticipated business activities, planned expenditures, corporate strategies, participation in projects and financing, and other statements that are not historical facts. By their nature, forward-looking information involves numerous assumptions, both general and specific, which may cause the actual results, performance or achievements of China Gold International and/or its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward–looking information. Some of the key assumptions include, among others, the absence of any material change in China Gold International’s operations or in foreign exchange rates, the prevailing price of gold, copper and other non-ferrous metal products; the absence of lower- than-anticipated mineral recovery or other production problems; effective income and other tax rates and other assumptions underlying China Gold International’s financial performance as stated in the Company’s technical reports for its CSH Mine and Jiama Mine; China Gold International’s ability to obtain regulatory confirmations and approvals on a timely basis; continuing positive labor relations; the absence of any material adverse effects as a result of political instability, terrorism, natural disasters, pandemics such as COVID-19, litigation or arbitration and adverse changes in government regulation; the availability and accessibility of financing to China Gold International; and the performance by counterparties of the terms and conditions of all contracts to which China Gold International and its subsidiaries are a party. The forward-looking information is also based on the assumption that none of the risk factors identified in this MD&A or in the AIF that could cause actual results to differ materially from the forward-looking information actually occurs.
- 3 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Forward-looking information contained herein as of the date of this MD&A is based on the opinions, estimates and assumptions of management. There are a number of important risks, uncertainties and other factors that could cause actual actions, events or results to differ materially from those described as forward-looking information. China Gold International disclaims any obligation to update any forward-looking information, whether as a result of new information, estimates, opinions or assumptions, future events or results, or otherwise except to the extent required by law. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking information in this MD&A is expressly qualified by this cautionary statement. The reader is cautioned not to place undue reliance on forward-looking information. THE COMPANY Overview China Gold International is a gold and base metal mining company registered in British Columbia, Canada. The Company’s main business involves the operation, acquisition, development and exploration of gold and base metal properties. The Company’s principal mining operations are the Chang Shan Hao Gold Mine (“CSH Mine” or “CSH”), located in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine (“Jiama Mine” or “Jiama”), located in Tibet, China. China Gold International holds a 96.5% interest in the CSH Mine, while its Chinese joint venture (“CJV”) partner holds the remaining 3.5% interest. The Company owns a 100% interest in the Jiama Mine, which hosts a large scale copper-gold polymetallic deposit containing copper, gold, molybdenum, silver, lead and zinc metals. China Gold International’s common shares are listed on the Toronto Stock Exchange (“TSX”) and The Stock Exchange of Hong Kong Limited (“HKSE”) under the symbol CGG and the stock code 2099, respectively. Additional information about the Company, including the Company’s Annual Information Form, is available on SEDAR+ at sedarplus.ca as well as Hong Kong Exchange News at hkexnews.hk. Performance Highlights Three months ended June 30, 2026 • Revenue increased by 50% to US$461.0 million from US$307.3 million for the same period in 2025. • Mine operating earnings of US$327.3 million, increased by US$167.9 million from mine operating earnings of US$159.4 million for the same period in 2025. • Net profit of US$275.8 million increased by US$159.5 million from US$116.3 million for the same period in 2025. • Cash flow from operation of US$286.5 million, increased from US$191.3 million for the same period in 2025. • Total gold production decreased by 14% to 37,498 ounces from 43,403 ounces for the same period in 2025. • Total copper production was 41.1 million pounds (approximately 18,641 tonnes) a slight increase from 39.7 million pounds (approximately 18,013 tonnes) for the same period in 2025.
- 4 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Six months ended June 30, 2026 • Revenue increased by 58% to US$914.2 million from US$580.4 million for the same period in 2025. • Mine operating earnings of US$620.1 million, increased by US$343.0 million from mine operating earnings of US$277.1 million for the same period in 2025. • Net profit of US$512.1 million increased by US$309.8 million from US$202.3 million for the same period in 2025. • Cash flow from operation of US$555.2 million, increased from US$334.8 million for the same period in 2025. • Total gold production decreased by 18% to 72,317 ounces from 88,200 ounces for the same period in 2025. • Total copper production was 78.6 million pounds (approximately 35,671 tonnes) a slight increase from 77.0 million pounds (approximately 34,924 tonnes) for the same period in 2025. Outlook After the repairs and reinforcements of the overflow of the Guolanggou Tailings Dam, the Government of Tibet Autonomous Region and relevant departments of the central government approved the resumption of Jiama’s operations on May 30, 2024, with a daily processing capacity of 34,000 tonnes, which is lower than the design processing capacity. The Company is actively advancing the construction of the Youlongbu tailings storage facility (Phase III tailings pond), which is expected to be completed and put into operation by the end of 2027. The total daily processing capacity is anticipated to increase to 44,000 tpd once the Youlongbu tailings storage facility is in operation. The open-pit operations at the CSH gold mine are nearing the end of its mine life. To ensure stable production continuity, the Company is actively advancing the transition from open-pit to underground mining, with relevant construction works already commenced. With the CSH pit’s increased depth, the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. On May 22, 2026, a localized slope instability event occurred at CSH Gold Mine, which was a localized geological hazard primarily attributed to heavy rainfall in the area combined with complex geological conditions. Mining activities at the open pit remain temporarily suspended pending further geotechnical and operational assessment. Processing operations continue utilizing available low-grade ore stockpiles to maintain production. The Company is currently assessing the potential impact of the event on mining operations and future production plans. Based on the information currently available, the Company does not expect the event to materially affect its annual production guidance. Inconsideration of the events, the Company reports separate production guidance for the two mines in 2026. CSH Mine: • The total gold production is estimated between 70,732 ounces (2.2 tonnes) and 83,592 ounces (2.6 tonnes). Jiama Mine: • The copper production will be approximately between 140 million pounds (63,500 tonnes) and 149 million pounds (67,500 tonnes); • The gold production will be approximately between 70,732 ounces (2.2 tonnes) and 75,554 ounces (2.35 tonnes); • The silver production will be approximately between 4.18 million ounces (130 tonnes) and 4.82 million ounces (150 tonnes).
- 5 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Outline of the Long-Term Development Plan for the Jiama Mine In 2024, the Company successfully restored stable operation at the Jiama Mine. In addition, the Company continued to focus its efforts on optimizing resource utilization plan, integrating the identified high-grade underground resources, and accelerating the exploration work at high potential zones. On June 30, 2026, the Company announced a transformational mineral resource update for the Jiama Mine, with measured mineral resource increased 523% and proven mineral reserve increased 1,170%. The long-term development plan for the Jiama Mine consists of three phases: • Prior to the completion of the construction of the new tailings storage facility (the “Youlongbu tailings storage facility”), the Jiama Mine Phase II processing plant will maintain and operate at its current processing capacity of 34,000 tons per day to match the Guolanggou’s storage capacity (the operation of Phase I processing plant has been suspended since May 2024). • The Youlongbu tailings storage facility is scheduled to commence operation by the end of 2027, allowing a further increase in the Jiama Mine’s production capacity. Over the next two years, as part of the underground resource integration plan, the Company plans to apply to increase the permitted capacity on its mining license for the Jiama Mine, subject to compliance with the relevant safety requirements. Currently, the permitted capacity on the mining license of the Jiama Mine is 14.4 million tonnes per year (approximately 44,000 tonnes per day based on 330 operating days per year). Subject to the government approval of an increased annual mining rate, and following the commissioning of Youlongbu tailings storage facility, the Jiama Mine’s ore processing volume will return to the level of 50,000 tonnes per day, in line with the designed processing capacity of the processing plants. In addition, endeavors are underway so that the production levels at the Jiama Mine will restore to those before the Guolanggou tailings overflow through blending of high-grade underground ores. • The Company is also working to substantially expand the known mineralized system and delineate additional mineral resources and reserves at depth and in surrounding areas of the Jiama Mine, including the Zegulang North. The Company completed a NI 43-101 Technical Report on June 30, 2026 with the updated Mineral Resource, which significantly expands the Jiama Mine’s scale and development potential, providing a robust foundation for future production expansion, mine life extension and further technical studies on larger-scale mining scenarios. Subject to the final exploration outcomes and feasibility studies on resource development, the Company will formulate a comprehensive expansion plan for the Jiama Mine area. This study has already been initiated at a preliminary stage. The Company will provide an update on the progress and results in due course.
- 6 -
MANAGEMENT’S DISCUSSION AND ANALYSIS RESULTS OF OPERATIONS Selected Quarterly Financial Data Quarter ended 202620252024
(US$ in thousands except per share)30-Jun31-Mar31-Dec30-Sep30-Jun31-Mar31-Dec30-Sep
Revenue461,013453,203384,734345,026307,269273,096293,567254,581 Cost of sales133,675160,433174,826147,993147,872155,444171,413207,762 Mine operating earnings327,338292,770209,908197,033159,397117,653122,15446,819 General and administrative expenses16,82415,10021,45014,18412,06812,23217,8779,944 Exploration and evaluation expenditures6117126822413350824749 Research and development expenses6,4635,45916,3997,8485,2563,2968,1184,704 Income from operations303,990272,040171,791174,777141,940101,61795,91232,122 Foreign exchange gain (loss)4,796(2,464)7,381(3,039)(2,037)(2,654)(4,631)2,670 Finance costs3,3654,0654,5114,7114,5805,0025,3135,692 Profit before income tax312,823267,214171,694153,450139,25295,77085,54030,166 Income tax expense (credit)37,07030,84343,99411,15622,9099,79117,2232,293 Net profit (loss)275,753236,371127,699142,294116,34385,97968,31727,873 Basic & diluted earnings (loss) per share (cents)68.9759.0231.6735.6029.0821.4516.976.84
Selected Quarterly and Annual Production Data and Analysis CSH MineThree months ended June 30,Six months ended June 30
2026202520262025
Gold sales (US$ million)97.7584.58224.45163.67 Realized average price (US$) of gold per ounce4,5463,3194,7033,094 Gold produced (ounces)21,50022,09042,85345,829 Gold sold (ounces)21,50025,48347,72452,893 Total production cost (US$ per ounce)1,7721,6121,7761,619 Cash production cost (1) (US$ per ounce)1,2821,2511,2911,153
(1) Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A
- 7 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Gold production at the CSH Mine decreased by 3% to 21,500 ounces for the three months ended June 30, 2026 compared to 22,090 ounces for the same period in 2025. The total production cost of gold for the three months ended June 30, 2026 increased to US$1,772 per ounce compared to US$1,612 for the same period in 2025. The cash production cost of gold for the three months ended June 30, 2026 increased to US$1,282 per ounce from US$1,251 for the same period in 2025. Jiama MineThree months ended June 30,Six months ended June 30,
2026202520262025
Copper sales (US$ in millions)189.18110.72359.84204.22 Realized average price 1 (US$) of copper per pound after smelting fee discount 6 4.742.864.662.70 Copper produced (tonnes)18,64118,01335,67134,924 Copper produced (pounds)41,096,64739,710,00278,640,91976,993,263 Copper sold (tonnes)17,98617,56535,03534,292 Copper sold (pounds)39,652,94638,722,49277,238,99875,599,786 Gold produced (ounces)15,99821,31329,46442,371 Gold sold (ounces)15,74120,88129,28741,619 Silver produced (ounces)1,542,4001,436,2602,776,9492,750,668 Silver sold (ounces)1,480,0331,392,3892,721,1382,685,804 Lead produced (tonnes)13,22610,26223,97021,038 Lead produced (pounds)29,158,47122,624,76452,845,99446,381,857 Lead sold (tonnes)12,4219,71823,28320,201 Lead sold (pounds)27,383,75721,423,65151,329,53744,536,444 Zinc produced (tonnes)7,7575,47712,12410,893 Zinc produced (pounds)17,102,25512,075,71926,728,18524,015,893 Zinc sold (tonnes)7,3005,10711,70310,470 Zinc sold (pounds)16,093,28111,258,96325,801,00523,081,507 Moly produced (tonnes)103255207452 Moly produced (pounds)226,331559,570456,142997,022 Moly sold (tonnes)85234197494 Moly sold (pounds)187,481516,452434,0851,087,991 Total production cost 2 (US$) of copper per pound2.963.193.253.29 Total production cost 2 (US$) of copper per pound after by-products credits 4 (1.38)0.33(0.98)0.53 Cash production cost 4 (US$) per pound of copper2.192.352.482.48 Cash production cost 3 (US$) of copper per pound after by-products credits 4 (2.16)(0.49)(1.75)(0.28)
1 A discount factor of 11.9% to 25.3% is applied to the copper benchmark price to compensate the refinery costs incurred by the buyers. The discount factor is higher if the grade of copper in copper concentrate is below 18%. The industry standard of copper in copper concentrate is between 18-20%. 2 Production costs include expenditures incurred at the mine sites for the activities related to production including mining, processing, mine site G&A and royalties etc. 3 Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A. 4 By-products credit refers to the sales of gold, silver, lead, zinc and moly during the corresponding period. 5 Increased production of by-products combined with reduced G&A and R&D costs, has resulted in by-product credits exceeding total production cost of copper. 6 Due to the relatively high discount factor applied to mixed ore, the overall copper sales price decreased compared with the prior year.
- 8 -
MANAGEMENT’S DISCUSSION AND ANALYSIS During the three months ended June 30, 2026, The Jiama Mine produced 18,641 tonnes (approximately 41.1 million pounds) of copper, which increased from of 18,013 tonnes (approximately 39.7 million pounds) during the comparative three month period in 2025. Total production cost of copper per pound decreased by 7% in the second quarter of 2026 as compared to the same period in 2025. Cash production cost of copper per pound decreased by 7% as compared to the same quarter in 2025. Total production cost of copper per pound after by-products and cash production cost of copper per pound after by-product also decreased in 2026 as compared to the same three month period in 2025, mainly due to higher by-product revenue from gold and silver. Review of Quarterly and Annual Data Three months ended June 30, 2026 compared to three months ended June 30, 2025 Revenue of US$461.0 million for the second quarter of 2026, increased by US$153.7 million from US$307.3 million for the same period in 2025. Revenue from the CSH Mine was US$97.8 million, an increase of US$13.2 million from US$84.6 million for the same period in 2025. The realized average gold price increased by 37%, from US$3,319/oz in Q2 2025 to US$4,546/oz in Q2 2026. Gold sold by the CSH Mine was 21,500 ounces (gold produced: 21,500 ounces), compared to 25,483 ounces (gold produced: 22,090 ounces) for the same period in 2025. Revenue from the Jiama Mine was US$363.3 million, an increase of US$140.6 million, compared to US$222.7 million for the same period in 2025. The realized average price of copper increased by 66%, from US$2.86/pound in Q2 2025 to US$4.74/pound in Q2 2026. Total copper sold was 17,986 tonnes (39.7 million pounds) for the three months ended June 30, 2026, an increase of 2% from 17,564 tonnes (38.7 million pounds) for the same period in 2025. Cost of sales of US$133.7 million for the quarter ended June 30, 2026, a decrease of US$14.2 million from US$147.9 million for the same period in 2025. Cost of sales as a percentage of revenue for the Company decreased from 48% to 29% for the three months ended June 30, 2025 and 2026, respectively. Cost of sales was impacted by many operation factors such as grade of ore, recovery rates and stripping ratio. Refer to the sections below for details of production factors for each individual mine. Mine operating earnings of US$327.3 million for the three months ended June 30, 2026, an increase of US$167.9 million from US$159.4 million for the same period in 2025. General and administrative expenses increased by US$4.7 million, from US$12.1 million for the quarter ended June 30, 2025 to US$16.8 million for the quarter ended June 30, 2026, partially due to higher taxes and surcharges resulting from increased revenue in the current quarter. Research and development expenses of US$6.5 million for the three months ended June 30, 2026, increased from US$5.3 million for the comparative period in 2025. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes. Income from operations of US$304.0 million for the second quarter of 2026, increased by US$162.1 million, compared to US$141.9 million for the same period in 2025. Foreign exchange gain of US$4.8 million for the three months ended June 30, 2026, increased from a loss of US$2.0 million for the same period in 2025. The gain was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB.
- 9 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Interest and other income of US$7.4 million for the three months ended June 30, 2026, increased from US$4.9 million for the same period in 2025, primarily due to higher interest income earned during the current quarter compared to the corresponding period last year. In addition, the Company recognized dividend income of US$2.9 million from China Nonferrous Mining Corporation Limited during the current quarter. Finance costs of US$3.4 million for the three months ended June 30, 2026, decreased by US$1.2 million compared to US$4.6 million for the same period in 2025. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Income tax expense of US$37.1 million for the three months ended June 30, 2026, increased by US$14.2 million from US$22.9 million for the comparative period in 2025. During the current quarter, the Company recorded deferred tax credit of US$8.2 million, compared to an expense of US$7.1 million for the same period in 2025. Net income of US$275.8 million for the three months ended June 30, 2026, increased by US$159.5 million from US$116.3 million for the three months ended June 30, 2025. Six months ended June 30, 2026 compared to six months ended June 30, 2025 Revenue of US$914.2 million for the first half of 2026, increased by US$333.8 million from US$580.4 million for the same period in 2025. Revenue from the CSH Mine was US$224.5 million, an increase of US$60.8 million from US$163.7 million for the same period in 2025. The realized average gold price increased by 52%, from US$3,094/oz in the first six months of 2025 to US$4,703/oz in the same period of 2026. Gold sold by the CSH Mine was 47,724 ounces (gold produced: 42,853 ounces), compared to 52,893 ounces (gold produced: 45,829 ounces) for the same period in 2025. Revenue from the Jiama Mine was US$689.8 million, an increase of US$273.1 million, compared to US$416.7 million for the same period in 2025. The realized average price of copper increased by 73%, from US$2.70/pound in the first six months of 2025 to US$4.66/pound in the same period of 2026. Total copper sold was 35,035 tonnes (77.2 million pounds) for the six months ended June 30, 2026, an increase of 2% from 34,292 tonnes (75.6 million pounds) for the same period in 2025. Cost of sales of US$294.1 million for the six months ended June 30, 2026, a decrease of US$9.2 million from US$303.3 million for the same period in 2025. Cost of sales as a percentage of revenue for the Company decreased from 52% to 32% for the six months ended June 30, 2025 and 2026, respectively. Cost of sales was impacted by many operation factors such as grade of ore, recovery rates and stripping ratio. Refer to the sections below for details of production factors for each individual mine. Mine operating earnings of US$620.1 million for the six months ended June 30, 2026, an increase of US$343.0 million from US$277.1 million for the same period in 2025. General and administrative expenses increased by US$7.6 million, from US$24.3 million for the six months ended June 30, 2025 to US$31.9 million for the six months ended June 30, 2026, partially due to higher taxes and surcharges resulting from increased revenue in the current period. Research and development expenses of US$11.9 million for the six months ended June 30, 2026, increased from US$8.6 million for the comparative period in 2025. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes. Income from operations of US$576.0 million for the six months ended June 30, 2026, increased by US$332.4 million, compared to US$243.6 million for the same period in 2025.
- 10 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Foreign exchange gain of US$2.3 million for the six months ended June 30, 2026, increased from a loss of US$4.7 million for the same period in 2025. The gain was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB. Interest and other income of US$9.1 million for the six months ended June 30, 2026, increased from US$6.7 million for the same period in 2025, primarily due to higher interest income earned during the current period compared to the corresponding period last year. In addition, the Company recognized dividend income of US$2.9 million from China Nonferrous Mining Corporation Limited during the current period. Finance costs of US$7.4 million for the six months ended June 30, 2026, decreased by US$2.2 million compared to US$9.6 million for the same period in 2025. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Income tax expense of US$67.9 million for the six months ended June 30, 2026, increased by US$35.2 million from US$32.7 million for the comparative period in 2025. During the current period, the Company recorded deferred tax credit of US$10.7 million, compared to a deferred tax expense of US$4.5 million for the same period in 2025. Net income of US$512.1 million for the six months ended June 30, 2026, increased by US$309.8 million from US$202.3 million for the six months ended June 30, 2025. NON-IFRS MEASURES The cash cost of production, cash cost after by-product credits and cash cost per ounce and per pound are measures that are not in accordance with IFRS. The Company has included these metrics to supplement its consolidated financial statements, which are presented in accordance with IFRS. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance, operating results or financial condition prepared in accordance with IFRS. The Company has included cash production cost per ounce and per pound data because it understands that certain investors use this information to determine the Company’s ability to generate earnings and cash flow. The measures are not necessarily indicative of operating results, cash flow from operations, or financial condition as determined under IFRS. The following tables provide a reconciliation of cost of sales to the cash costs of production in total dollars and in dollars per gold ounce for the CSH Mine or per copper pound for the Jiama Mine:
- 11 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Cash production cost for gold is calculated as total cost of sales adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of gold per ounce is calculated as total cash production cost divided by total gold sold (ounces). CSH Mine (Gold)Three months ended June 30,Six months ended June 30,
2026202520262025 US$ US$ Per ounceUS$ US$ Per ounceUS$ US$ Per ounceUS$ US$ Per ounce
Total Cost of sales 1 38,092,0891,77241,083,5901,61284,755,5341,77685,622,3911,619 Adjustment – Depreciation & depletion(10,224,780)(476)(9,042,823)(355)(22,721,182)(476)(24,217,957)(458)
Adjustment – Amortization of intangible assets(302,605)(14)(158,213)(6)(421,367)(9)(415,399)(8)
Total cash production costs27,564,7041,28231,882,5541,25161,612,9851,29160,989,0351,153
Total Gold sold ounces21,50025,48347,72452,893
Cash production cost of gold US$ per ounce calculated as total cash production cost divided by total gold sold ounces.
Cash Production cost for copper is calculated as production costs (total cost of sales adjusted by General and administrative expenses and Research and development expenses) adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of copper (pounds) is calculated as total cash production cost divided by total copper sold (pounds). Jiama Mine (Copper with by-products credits)Three months ended June 30,Six months ended June 30,
2026202520262025 US$ US$ Per PoundUS$ US$ Per PoundUS$ US$ Per PoundUS$ US$ Per Pound
Total Cost of sales95,582,0502.41106,787,3632.76209,352,0542.71217,692,3072.88
General and administrative expenses15,604,4380.3911,037,3840.2929,737,3650.3922,317,8290.30 Research and development expenses6,462,4650.165,256,8770.1411,921,7530.158,552,4760.11
Total production cost117,648,9532.96123,081,6243.19251,011,1723.25248,562,6123.29
Adjustment – Depreciation & depletion(24,050,180)(0.61)(25,244,711)(0.65)(47,207,459)(0.61)(47,845,864)(0.63) Adjustment – Amortization of intangible assets(6,319,242)(0.16)(7,184,749)(0.19)(12,266,193)(0.16)(13,933,658)(0.18)
Total cash production costs87,279,5312.1990,652,1642.35191,537,5202.48186,783,0902.48
By-products credits(172,408,019)(4.35)(110,149,983)(2.84)(326,616,518)(4.23)(208,730,753)(2.76)
Total cash production costs after by-products credits(85,128,488)(2.16)(19,497,820)(0.49)(135,078,998)(1.75)(21,947,663)(0.28)
Total Copper sold pounds39,652,94638,722,49277,238,99875,599,786
Cash production cost of copper US$ per pound calculated as total cash production cost divided by total copper sold pounds.
- 12 -
MANAGEMENT’S DISCUSSION AND ANALYSIS MINERAL PROPERTIES The CSH Mine The CSH Mine is located in Inner Mongolia Autonomous Region of China (Inner Mongolia). The property hosts two low- grade, near surface gold deposits, along with other mineralized prospects. The main deposit is called the Northeast Zone (the “Northeast Zone”), while the second, smaller deposit is called the Southwest Zone (the “Southwest Zone”). The CSH Mine is owned and operated by Inner Mongolia Pacific Mining Co. Limited, a Chinese Joint Venture in which the Company holds a 96.5% interest and Ningxia Nuclear Industry Geological Exploration Institution holds the remaining 3.5%. The CSH Mine is an open-pit mining operations with a designed mining and processing capacity of 60,000 tpd. In July 2019, CSH updated its mine plan based on a result of latest ultimate limit optimization, in which the production rate was reduced to 40,000 tpd with a life of mine (“LoM”) of seven years as of 2019. The run-of-mine ore is heap leached with cyanide solution to extract gold and electro-winned to produce a gold dore which is sold to refiners. In June 2020, the operation of southwest pit ended. The open-pit operations at the CSH gold mine are nearing the end of its mine life. With the increase in the pit’s depth, the height and exposed area of the pit wall have increased, and the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. Ensuring slope stability and avoiding systematic risks at this stage is the Company’s top priority to ensure safe and sustainable production. The Company continues to evaluate the potential for underground operations. The major new contracts entered into during the six months ended June 30, 2026: Item No.Contract NameCounterpart Subject amount (US $ millions) Contract period (effective day and expiration date)Date of Contract
1Construction Contract for the Ventilation and Drainage Systems of the Haoyao’erhudong Gold Mine Annual 8.25 Million Metric Tonne Gold Ore Mining Project (Conversion from Open-Cast to Underground Mining) China Gold Group Construction Corporation Limited 18.542026.4.26-2029.12.312026.3.3 2Inner Mongolia Pacific.Mining and stripping procedure of open-pit for the 2026-2028 period China Gold Group Construction Corporation Limited 55.572026.1.1-2028.12.312026.3.6
Production Update CSH MineThree months ended June 30,Six months ended June 30,
2026202520262025
Ore mined and placed on pad (tonnes)2,056,7053,388,4653,790,7436,097,924 Average ore grade (g/t)0.520.480.530.50 Recoverable gold (ounces)20,38630,88238,09058,817 Ending gold in process (ounces)133,259155,295133,259155,295 Waste rock mined (tonnes)339,6981,608,2331,311,8463,911,422
For the three months ended June 30, 2026, the total amount of ore placed on the leach pad was 2.1 million tonnes, with total contained gold of 20,386 ounces (634.1 kilograms). The overall accumulative project-to-date gold recovery rate remained consistent at approximately 56.74% at the end of June 30, 2026 from 56.70% at the end of March 31, 2026. Of which, gold recovery from the phase I and phase II heap leach pads were 59.77% and 55.09% at June 30, 2026, respectively.
- 13 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Exploration There was no drilling or exploration program for the six months ended June 30, 2026 for the CSH Mine. Mineral Resource Update CSH Mine Mineral Resources by category, at December 31, 2025 under NI 43-101 are listed below: Metal
Location
Mineral
Resource
Category
Tonnage
(x1000 t)Au (g/t)Au (t)Au (Moz)
Remaining within the open pit
limit at a cut-off grade of
0.28 g/t Au
Measured6,0310.684.090.132
Indicated6,6470.724.750.153
M+I12,6780.708.840.285
Inferred2,5760.410.150.005
Underground at a cut-off grade
of 0.30 g/t Au
Measured88,2000.6758.661.89
Indicated89,8500.5852.071.67
M+I178,0500.62110.723.56
Inferred62,0900.4930.680.99
Note: Mineral Resources are reported in relation to a conceptual open-pit mining and underground block caving mining. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate. Raw assays have been capped. Mineral Resources include Mineral Reserves. Mineral Resources are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. Additional Mineral Resources are reported at a cut-off grade of 0.30 g/t Au for underground block caving mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce is equal to 31.1035 grams. The mineral resource estimates include Au only. CGME Consulting limited (CGME) has estimated the mineral resources of the CSH gold deposit based on a cut-off grade of 0.28 g/t Au within the optimized ultimate open-pit limit and a cut-off grade of 0.30 g/t Au below the open pit limit on April 1, 2022. The resource estimate was conducted using Ordinary Kriging, validated by Inversed Distance Squared method, and Micromine modelling software. CGME considers that blocks estimated for the first estimation pass with an average anisotropic distance to samples of less than 45 m can be classified as Measured Mineral Resources, and blocks estimated for the second estimation pass with an average anisotropic distance to samples of less than 80 m can be classified as Indicated Mineral Resources, and blocks estimated for the third estimation pass with an average anisotropic distance to samples of not more than 150 m can be categorised as Inferred Mineral Resources. For those Measured and Indicated Mineral Resource blocks, CGME considers that the degree of confidence is sufficient to allow an appropriate application of technical and economic parameters to support mine planning and to allow evaluation of the economic viability of the deposit, which is also adequate to support the open pit mining operations. In CGME’s opinion, the upper portions of gold mineralization at the CSH Gold Project are amenable to extraction by open pit mining with a cut-off grade optimised of 0.28 g/t Au, and the block caving mining operation would be the choice for extraction below the optimized open pit limits with a cut-off grade of 0.30 g/t Au in this estimation based on a Reasonable Prospect for Eventual Economic Extraction (“RPEEE”). It is noted that the partial mineral resources outside of the open pit limit but above the bottom plane may not be amenable to extraction in the future. Meanwhile, the mineral resources located below 840 m ASL at NE zone and 1,250 m ASL at SW zone may not be amendable to extraction in the future due to either excessive depth or high dilution. These mineral resources that may not be amendable to extraction in the future are excluded from the Mineral Resource Statement in this Report. Block model quantity and grade estimates for the CSH gold deposit were classified according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Yuan Chen, MSc., MAIG (M4014)/RPGeo (10262) (April 2022), an independent Qualified Person for the purposes of National Instrument 43-101 and updated by Mr. Yingting Guo, MMSA., PGeo., an independent Qualified Person for the purposes of National Instrument 43-101 on December 31, 2025.
- 14 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Mineral Reserves Update CSH Mine Mineral Reserves by category at December 31, 2025 under NI 43-101 are summarized below: Metal
Type T (x 1,000)Diluted Au g/tAu tAu Moz
Proven6,4050.644.110.13 Probable7,2220.674.870.16
Total13,6270.668.980.29
Note: Mineral Reserves are reported based on the optimized ultimate open pit limit. All figures are rounded to reflect the relative accuracy of the estimate. Mineral Reserves are included in Mineral Resources. Mineral Reserves are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,568 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce is equal to 31.1035 grams. The Proven Mineral Reserves are 6.41 Mt at a grade of 0.64 g/t Au for the gold content of 4.11 t or 0.13 Moz, and the Probable Mineral Reserves are 7.22 Mt at a grade of 0.67 g/t Au for the gold content of 4.87t or 0.16 Moz, totaling Mineral Reserves of 13.63 Mt at a grade of 0.66 g/t Au for the gold content of 8.98 t or 0.29 Moz. The Mineral Reserves for the CSH gold deposit were estimated according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Guangpian Zhang, AusIMM, a full time Principal Mining Engineer for CGME and a Qualified Person for the purposes of National Instrument 43-101. The Jiama Mine Jiama is a large copper-gold polymetallic deposit containing copper, gold, silver, molybdenum, lead and zinc, located in the Gandise metallogenic belt in Tibet Autonomous Region of China. The Jiama Mine has both underground mining and open-pit mining operations. Phase I of the Jiama Mine commenced operation in the latter half of 2010 and reached its design capacity of 6,000 tpd in early 2011. Phase II of the Jiama Mine commenced mining operations in 2018 with 44,000 tpd design capacity. The combined mining and processing design capacity at the Jiama Mine is 50,000 tpd.
- 15 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
The major new contracts entered into during the six months ended June 30, 2026:
Item No.Contract NameCounterpart
Subject amount
(US $ millions)
Contract period
(effective day and
expiration date)
Date of
Contract
1Contract for the 110kV Transmission and
Transformation Project of Youlongbu Tailings
Reservoir by Tibet Huatailong Mining
Development Co., Ltd.
China Energy Construction
Group Guangxi Hydropower
Engineering Bureau Co., Ltd.
5.68 2026.02.04 –
To be completed
within 90 days of
contract date
2026.02.04
2Xizang Huatailong Mining Development Co.,
Ltd. Underground Drilling Project Contract for
Jamang Mine Area, 2026-2028
Yunnan Geological Survey
Institute of Sinochem
Geological & Mining Bureau
3.90 2026.04.07 –
2029.04.06
2026.04.07
Production Update Jiama MineThree months ended June 30,Six months ended June 30,
2026202520262025
Ore processed (tonnes)2,815,5562,982,2855,553,7345,837,608 Average copper ore grade (%)0.770.710.750.71 Copper recovery rate (%)87858684 Average gold grade (g/t) 0.220.300.210.31 Gold recovery rate (%)80737868 Average silver grade (g/t)22.5721.0221.2121.17 Silver recovery rate (%)76717369 Average Lead grade (%)1.111.081.051.04 Lead recovery rate (%)83.1577.8581.5077.06 Average Zinc grade (%)0.700.630.580.58 Zinc recovery rate (%)75.6471.7575.0372.2 Average Moly grade (%)0.020.040.020.04 Moly recovery rate (%)34333433
Exploration In 2026, Tibet Huatailong Mining Development Co., Ltd. plans to continue geological exploration projects in the peripheral of the Jiama mining area and the Bayi Ranch, with a planned 50,840 meters of surface drilling across 55 holes (including 6,000 meters of contingent drilling), 1:5,000 hydrogeological, engineering, and environmental geological mapping covering 40.77 square kilometers and 1:2,000 mapping covering 2.96 square kilometers in the outer area of the Jiama Mining area, and 1:2,000 geological mapping covering 4 square kilometers, 1:2,000 geological cross-section surveys spanning 4 kilometers, and 1:2,000 rock geochemical surveys covering 4 square kilometers at the Bayi Ranch. The estimated total budget is approximately US$17.2 million (RMB119.08 million). By the end of the second quarter of 2026, 5,081.6 meters of drilling with 9 holes has been completed for the carry-over drilling project in the peripheral area of Jiama mine. For the preparation of the new 2026 exploration project, the tendering works for all sub-projects have been completed. Nine rigs are currently being mobilized and ready for commencement. Of the ten prerequisite items related to land use procedures, seven have been completed, and the remaining three are in progress.
- 16 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Mineral Resources Estimate In June 30, 2026, Changchun Gold Design Institute (“CGDI) was engaged to prepare the updated mineral resources and reserve estimate on the Jiama mine by combining mineralized units together with lithology, a full three-dimensional (3D) solid and block models were constructed in the mineral resource estimation for the Jiama mine. The mineralization wireframes are defined using a cutoff grade of 0.3%. In Leapfrog, radial basis function interpolation (RBF interpolation) is used to create mineralized bodies (domains) based on copper grades in the combined samples and distinct molybdenum, gold, silver, lead, and zinc (where applicable). Block models of copper, molybdenum, and other metals, as well as specific gravity (SG), were modeled using the conventional Kriging method (OK) and local variable directivity (dynamic anisotropy). Mineral resource estimates are based on the Canada CIM Mineral Resources and Reserves Definition Standard, officially adopted on May 10, 2014, and then subsequent MRMR Best Practice Guide updated in 2019, as well as Canada NI43-101 “Mineral Project Standards and Disclosures,” (2012). Mineral resource estimates for Jiama project as of June 30, 2026 are summarized in table below: Results of Mineral Resource Estimates for Jiama Mine at cutoff grade 0.3% Cu as of June 30, 2026* CategoryMassCuMo AgAuPbZnCuMo AgAuPbZn Mt%%g/tg/t%%MtMtMozMozktkt
Measured623.10.710.0313.160.290.080.044.380.21263.595.77478.80268.39 Indicated711.90.680.0312.100.290.060.034.770.23277.036.67426.45230.17 M & I1,3350.690.0312.600.290.070.049.150.44540.6212.45905.25498.55 Inferred454.70.650.0312.530.280.120.052.990.13183.224.04525.79205.66
*: 1) Mineral Reserves and Mineral Resources have been estimated as of 30 June 2026 in accordance with NI 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101) as required by Canadian securities regulatory authorities. 2) 0.3% copper cut-off grade has been used to report the Mineral Resource Estimation (MRE). 3) Reported Mineral Resources contain no allowances for hanging wall or footwall contact boundary loss and dilution. No mining recovery has been applied. 4) The Mineral Resources was depleted to account for UG mining tunnel and mined-out, and current open-pit excluded. 5) Mineral Resources are reported inclusive of Mineral Reserves. 6) All Mineral Resource Estimates including Cu, Mo, Au, Ag, Pb, and Zn grade and their tonnages have been rounded to reflect the imprecise nature of the estimates for each classification category, therefore totals may not appear to sum correctly due to rounding. 7) Tony (Yingting) Guo, PhD, PGeo and Chaoxian (Ian) Zhou, MSc estimated the Mineral Resources. This Mineral Resource Estimation (MRE) was estimated with an effective date of 30 June 2026 and depleted to account for annual production up until 31 December 2025. 8) Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. 9) M, Measured, I, Indicated.
- 17 -
MANAGEMENT’S DISCUSSION AND ANALYSIS As of June 30, 2026, the total measured resources at the Jiama Mine mining area include 4.38 million tons of copper metal, with a grade of 0.71%; Molybdenum metal content was 0.21 million tons, grade 0.03%; Lead metal content was 0.48 million tons, grade 0.08%; Zinc metal content was 0.27 million tons, grade 0.04%; Associated gold metal content is 5.77 million ounces, grading 0.29g/t; Associated silver metallic content is 264 million ounces, with a grade of 13.16 g/t. Indicated resource of 4.77 million tons of copper metal, grade 0.68%; Molybdenum metal content was 0.23 million tons, grade 0.03%; Lead metal content was 0.43 million tons, grade 0.06%; Zinc metal content is 0.23 million tons, grade 0.03%; Gold metal content is 6.67 million ounces, with a grade of 0.29 g/t; Silver metallic content is 277 million ounces, with a grade of 12.10g/t. The inferred resource contains 2.99 million tons of copper metal, with the copper grade of 0.65%; Molybdenum metal content was 0.13 million tons, grade 0.03%; Lead metal content was 0.53 million tons, grade 0.12%; Zinc metal content was 0.21 million tons, grade 0.05%; Gold metal content is 4.04 million ounces, with a grade of 0.28 g/t; Silver metal content is 183 million ounces, with a grade of 12.53 g/t. Mineral Reserves Estimate Updated mineral reserve estimates are based on the 2019 definition standards set by the Canadian Institute of Mines, Metallurgy and Petroleum (CIM). The mineral reserves of the Jiama Mine project were completed by CGDI. Reserve estimates are based on data and information up to December 31, 2025. Open-pit copper grade 0.3% and underground copper grade 0.5% as the cutoff grades were used for the mineral reserve estimate. The reserve estimate results are summarized in Table below: As of the June 30, 2026, the total proven mineral reserves under at Jiama Mine are 310.9 million tons of ore, containing 2.8 million tons of copper at a grade of 0.90%, 0.11 million tons of molybdenum at a grade of 0.035%, 3.98 million ounces of gold at a grade of 0.4 g/t, 179.3 million ounces of silver at a grade of 17.94 g/t, 0.26 million tons of lead at grade of 0.08% and 0.13 million tons of zinc at a grade of 0.04%. The total probable mineral reserves under at Jiama Mine are 340.3 million tons of ore, containing 2.93 million tons of copper at a grade of 0.86%, 0.116 million tons of molybdenum at a grade of 0.034%, 4.47 million ounces of gold at a grade of 0.41 g/t, 186.2 million ounces of silver at a grade of 13.23 g/t, 0.20 million tons of lead at grade of 0.06% and 0.09 million tons of zinc at a grade of 0.03%. Mineral Reserves at Jiama Project as of June 30, 2026* Average GradeMetal Contained CategoryOreCuMoAuPbZnAgCuEqCuMo AuAgPbZn Mt%%g/t%%g/t%MtMt Moz Moz KtKt
Proven310.90.900.0350.40.080.0417.941.482.80.113.98179.30.260.13 Probable340.30.860.0340.410.060.0313.231.402.930.1164.47186.20.200.09 Total651.20.880.0340.40.070.0415.101.435.730.228.45369.90.450.24
*: 1) All mineral reserves are determined according to the CIM standard specified in Canadian National Standard 43-101 2) Mineral reserves are estimated based on the following mining and economic factors: open-pit mining: a) mining methods use a 2% dilution factor and a 98% mining recovery rate; b) The overall open pit slope is 43 degrees; c) Copper price at $4.66 per pound;
- 18 -
MANAGEMENT’S DISCUSSION AND ANALYSIS d) Overall copper processing and recovery rate is 85%; e) Cutoff grade at 0.3% Cu. Underground mining: a) Mining dilution by 12%; b) Mining losses by 15%; c) Beneficiation yield of 85%; d) Cutoff grade at 0.5% Cu. 3) Mineral reserves: Open-pit copper equivalent grade 0.61% CuEq, underground copper equivalent grade l.61% CuEq; CuEq = Cu+0.01Ag+1.69Mo+0.79Au +0.23Pb+0.26*Zn; Cu, 4.66 USD/lbs, Mo, 20 USD/lbs, Ag,40USD/oz Au, 2890 USD/oz, Pb, 1.1 USD/lbs, Zn, 1.4 USD/lbs; 4) The mineral reserve estimate was prepared by Dr. Siwei He, an external consultant at Changchun Gold Design Institute Co., Ltd. He is a qualified QP under the Canadian NI43-101 standard. LIQUIDITY AND CAPITAL RESOURCES The Company operates in a capital intensive industry. The Company’s liquidity requirements arise principally from the need for financing its mining and mineral processing operations, exploration activities and acquisition of exploration and mining rights. The Company’s principal sources of funds have been proceeds from borrowings from commercial banks, corporate bonds financing, equity financings, and cash generated from operations. The Company’s liquidity primarily depends on its ability to generate cash flow from its operations and to obtain external financing to meet its debt obligations as they become due, as well as the Company’s future operating and capital expenditure requirements. At June 30, 2026, the Company had an accumulated surplus of US$1.1 billion, working capital of US$909.9 million and borrowings of US$463.3 million. The Company’s cash balance at June 30, 2026 was US$1.03 billion, among which cash and cash equivalents was US$586.4 million, Restricted cash was US$43.5 million, term deposits was US$403.8 million. Management believes that its forecast operating cash flows are sufficient to cover the next twelve months of the Company’s operations including its planned capital expenditures and current debt repayments. The Company’s borrowings are comprised of US$169.1 million of short term debt facilities with interest rates ranging from 1.25% to 4.16% per annum arranged through various banks. In addition, on November 3, 2015, the Company entered into a Loan Facility agreement with a syndicate of banks, led by Bank of China. The lenders agreed to lend an aggregate principal amount of RMB3.98 billion, approximately US$613 million with the initial interest rate of 2.83% per annum. The proceeds from the Loan Facility are to be used for the development of the Jiama Mine. The loan is secured by the mining rights for the Jiama Mine. As of June 30, 2026 the Company has fully drawn under this Facility. The outstanding loan balance is RMB1.27 billion (approximately US$186 million), bearing an annual interest rate of 1.5% maturing on November 5, 2029. On April 29, 2020, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB1.4 billion (approximately US$197.8 million). As of June 30, 2026, the Company has fully drawn down under this facility. The outstanding loan balance is RMB809 million (approximately US$119 million), bearing an annual interest rate of 1.6%, with maturity on April 28, 2034.
- 19 -
MANAGEMENT’S DISCUSSION AND ANALYSIS On August 8, 2025, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB2.1 billion (approximately US$294 million).As of June 30, 2026, the Company has drawn down RMB50 million (approximately US$7.2 million) under this facility, bearing an annual interest rate of 1.5%, with maturity on June 21, 2030. On November 9, 2023, the Company obtained a bilateral loan with an aggregate principal amount of RMB100 million (approximately US$14.1 million) from China Construction Bank at an annual interest rate of 1.25%. As of June 30, 2026, the outstanding loan balance was RMB88 million (approximately US$12.9 million). On May 13, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million (approximately US$28.2 million) from Lhasa Chengguan District Sub branch of Agricultural Bank of China Co., Ltd. at an annual interest rate of 1.35% for a term of 3 years. As of June 30, 2026, the outstanding loan balance was RMB60 million (approximately US$8.8 million). On August 20, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million (approximately US$28.04 million) from China Gold Finance Co., Ltd. at an annual interest rate of 2.45% for a term of 3 years. As of June 30, 2026, the outstanding loan balance was RMB180 million (approximately US$26.0 million). On May 12, 2026, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$64 million from China Construction Bank (Asia) Corporation Limited, bearing interest at a floating rate based on Term SOFR. On June 9, 2026, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$10 million from China Everbright Bank Co., Ltd., Hong Kong Branch, bearing interest at a floating rate based on Term SOFR. The Company believes that the availability of debt financing in China at favorable rates will continue for the foreseeable future. The Company continues to review and assess its assets for impairment as part of its financial reporting processes. To date, the assessment carried out by the Company support the carrying values of the Company’s assets and no impairment has been required. However, the management of the Company continues to evaluate key assumptions on estimates and management judgements in order to determine the recoverable amount of the CSH Mine and the Jiama Mine. CASH FLOWS The following table sets out selected cash flow data from the Company’s consolidated cash flow statements for the three and six months ended June 30, 2026 and June 30, 2025. Three months ended June 30,Six months ended June 30,
2026202520262025 US$’000US$’000US$’000US$’000
Net cash from operating activities286,477191,318555,180334,848 Net cash used in investing activities(45,978)(45,687)(110,842)(132,380) Net cash (used in) financing activities(265,433)(77,837)(271,388)(78,172) Net (decrease) increase in cash and cash equivalents(24,934)67,794172,950124,296 Effect of foreign exchange rate changes on cash and cash equivalents7,91390914,0651,120 Cash and cash equivalents, beginning of period603,438240,492399,402183,779
Cash and cash equivalents, end of period586,417309,195586,417309,195
- 20 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Operating cash flow For the three months ended June 30, 2026, net cash inflow from operating activities was US$286.5 million which is primarily attributable (i) profit before income tax of US$312.8 million (ii) depreciation of property, plant and equipment of US$31.9 million and (iii) amortization of mining rights of US$13.8 million, partially offset by and (i) income tax paid of US$44.3 million, (ii) increase in trade and other receivables of US$10.8 million and (iii) decrease in contract liabilities of US$9.9 million. For the six months ended June 30, 2026, net cash inflow from operating activities was US$555.2 million which is primarily attributable (i) profit before income tax of US$580.0 million (ii) depreciation of property, plant and equipment of US$62.1 million and (iii) decrease in inventories of US$22.7 million, partially offset by (i) income tax paid of US$64.4 million, (ii) increase in trade and other receivables of US$13.8 million and (iii) decrease in trade and other payables of US$12.3 million. Investing cash flow For the three months ended June 30, 2026, the net cash outflow from investing activities was US$46.0 million which is primarily attributable to (i) placement of term deposits of US$146.7 million and (ii) payment for acquisition of property, plant and equipment of US$6.7 million, offset by (i) redemption of term deposits of US$110.0 million and (ii) interest income received of US$2.5 million. For the six months ended June 30, 2026, the net cash outflow from investing activities was US$110.8 million which is primarily attributable to (i) placement of term deposits of US$348.2 million and (ii) payment for acquisition of property, plant and equipment of US$22.8 million, offset by (i) redemption of term deposits of US$261.1 million and (ii) interest income received of US$4.0 million. Financing cash flow For the three months ended June 30, 2026, the net cash outflow mainly from financing activities was US$265.4 million which is primarily attributable to (i) dividends paid to shareholders of US$186.3 million and (ii) repayment of bank and other borrowings of US$108.7 million. For the six months ended June 30, 2026, the net cash outflow mainly from financing activities was US$271.4 million which is primarily attributable to (i) dividends paid to shareholders of US$186.3 million and (ii) repayment of bank and other borrowings of US$113.7 million. Expenditures Incurred For the six months ended June 30, 2026, the Company incurred mining costs of US$25.5 million, mineral processing costs of US$54.4 million and transportation costs of US$1.5 million. Gearing ratio Gearing ratio is defined as the ratio of consolidated total debt to consolidated total equity. As at June 30, 2026, the Company’s total debt was US$463.3 million and the total equity was US$2,661.4 million. The Company’s gearing ratio was therefore 0.17 as at June 30, 2026 compared to 0.22 as at March 31, 2026.
- 21 -
MANAGEMENT’S DISCUSSION AND ANALYSIS SIGNIFICANT INVESTMENTS, ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES. ASSOCIATES AND JOINT VENTURES, AND FUTURE PLAN FOR MATERIAL INVESTMENTS OF CAPITAL ASSETS Other than as disclosed elsewhere in this MD&A or in the condensed consolidated financial statements for the six months ended June 30, 2026, there were no significant investments held by the Company, nor were there any material acquisitions or disposals of subsidiaries, associates and joint ventures during the six months ended June 30, 2026. Other than as disclosed in this MD&A, there was no plan authorized by the Board for other material investments or additions of capital assets at the date of this MD&A. CHARGE ON ASSETS Other than as disclosed elsewhere in this MD&A and condensed consolidated financial statements, none of the Company’s assets were pledged as at June 30, 2026. EXPOSURE TO FLUCTUATIONS IN EXCHANGE RATES AND RELATED HEDGES The Company is exposed to the financial risk related to the fluctuation of foreign exchange rates for the monetary assets and liabilities denominated in the currencies other than the functional currencies to which they relate. The Company has not hedged its exposure to currency fluctuation. However, the Management monitors foreign exchange exposure and will consider hedging significant foreign currency exposure should the need arise. Refer to Note 33, Financial Instruments, in the annual consolidated financial statements for the year ended December 31, 2025. COMMITMENTS Commitments include principal payments on the Company’s bank loans and syndicated loan facility, corporate bonds, and capital commitments in respect of the future acquisition of property, plant and equipment and construction for both the CSH Mine and the Jiama Mine. The Company’s capital commitments relate primarily to the payments for purchase of equipment and machinery for both mines and payments to third-party contractors for the provision of mining and exploration engineering work and mine construction work for both mines. The Company has entered into contracts that prescribe such capital commitments; however, liabilities relating to them have not yet been incurred. Refer to Note 34, Commitments, in the annual consolidated financial statements for the year ended December 31, 2025. The following table outlines payments for commitments for the periods indicated:
TotalWithin One year
Within Two
to five yearsOver five years
US$’000US$’000US$’000US$’000
Principal repayment of bank loans433,961169,068210,03354,860 Entrusted loan payable29,36529,365––
In addition to the table set forth above, the Company has entered into service agreements with third-party contractors for the provision of mining and exploration engineering work and mine construction work for the CSH Mine. The fees for such work performed and to be performed each year varies depending on the amount of work performed. The Company has similar agreements with third party contractors for the Jiama Mine.
- 22 -
MANAGEMENT’S DISCUSSION AND ANALYSIS RELATED PARTY TRANSACTIONS China National Gold Group Co., Ltd. (formerly known as China National Gold Group Corporation) (“CNG”) owned 40.01 percent of the outstanding common shares of the Company as at December 31, 2025 and June 30, 2026. The Company had major related party transactions with the following companies related by way of shareholders or shareholder in common: The Company’s subsidiary, Inner Mongolia Pacific is a party to a non-exclusive contract for the purchase and sale of doré with CNG (the “Dore Sales Contract”) pursuant to which Inner Mongolia Pacific sells gold doré bars to CNG. The pricing is based on the monthly average price of gold ingot as quoted on the Shanghai Gold Exchange and the daily average price of silver as quoted on the Shanghai Huatong Platinum & Silver Exchange prevailing at the time of each relevant purchase order during the contract period. The Dore Sales Contract has been in effect since October 24, 2008 and was renewed for a new term that commenced on January 1, 2018 and expired on December 31, 2020, which renewal was approved by the Company’s shareholders on June 28, 2017. On June 16, 2020, the third Supplemental Contract for Purchase and Sale of Dore was approved by the Company’s Shareholders, commencing on January 1, 2021 and expiring on December 31, 2023. On June 29, 2023, the fourth supplemental Contract for Purchase and Sale of Dore was approved by the Company’s Shareholders, commencing on January 1, 2024 and expiring on December 31, 2026. Revenue from sales of gold doré bars to CNG was US$224.5 million for the six months ended June 30, 2026 which increased from US$163.7 million for the six months ended June 30, 2025. The Company is also a party to a Product and Service Framework Agreement with CNG, pursuant to which CNG provides construction, procurement and equipment financing services to the Company and also purchases the copper concentrates produced at the Jiama Mine. The quantity of copper concentrates, pricing terms and payment terms may be established from time to time by the parties with reference to the pricing principles for connected transactions set out under the Product and Service Framework Agreement. On June 28, 2017, the Supplemental Product and Service Framework Agreement was approved and extended to expire on December 31, 2020. On June 16, 2020, the third Supplemental Product and Service Framework Agreement was approved by the Company’s Shareholders, commencing on January 1, 2021 and expiring on December 31, 2023. On June 29, 2023, the fourth Supplemental Product and Service Framework Agreement was approved by the Company’s Shareholders, commencing on January 1, 2024 and expiring on December 31, 2026. For the six months ended June 30, 2026, revenue from sales of copper concentrate and other products to CNG was US$686.5 million compared to US$412.9 million for the same period in 2025. For the six months ended June 30, 2026, construction services of US$33.9 million were provided to the Company by subsidiaries of CNG compared to US$66.7million for the same period in 2025. In addition to the aforementioned major related party transactions, the Company also obtains additional services from related parties in its normal course of business, including a Loan Agreement and a Deposit Services Agreement entered into on March 25, 2019, December 31, 2019, December 22, 2020 and a Financial Service Agreement on May 5, 2021 among the Company and China Gold Finance. The Company and China Gold Finance entered into a 2024 Financial Service Agreement on June 6, 2024. As part of the 2024 Financial Service Agreement, China Gold Finance agreed to provide the Company with a range of financial services including (a) Deposit Services, (b) Lending Services, (c) Settlement Services and (d) Other Financial Services. On June 27, 2024, the 2024 Financial Services Agreement was approved by the Company’s Shareholders, commencing on the date of the approval by the Independent Shareholders and up to and including December 31, 2026. Refer to Note 18 of the condensed consolidated financial statements for details of significant related party transactions during the six months ended June 30, 2026.
- 23 -
MANAGEMENT’S DISCUSSION AND ANALYSIS PROPOSED TRANSACTIONS The Board of Directors has given the Company approval to conduct reviews of a number of projects that may qualify as acquisition targets through joint venture, merger and/or outright acquisitions. The Company did not have any material acquisition and disposal of subsidiaries and associated companies for the six months ended June 30, 2026. The Company continues to review possible acquisition targets. CRITICAL ACCOUNTING ESTIMATES In the process of applying the Company’s accounting policies, the Directors of the Company have identified accounting judgments and key sources of estimation uncertainty that have a significant effect on the amounts recognized in the audited annual consolidated financial statements. Key assumptions concerning the future and other key sources of estimation uncertainty at the end of each reporting period that have a risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next twelve months are described in Note 4 of the audited annual consolidated financial statements for the year ended December 31, 2025. CHANGE IN ACCOUNTING POLICIES A summary of new and revised IFRS standards and interpretations are outlined in Note 2 of the audited annual consolidated financial statements as at December 31, 2025. FINANCIAL INSTRUMENTS AND OTHER INSTRUMENTS The Company holds a number of financial instruments, the most significant of which are equity securities, accounts receivables, accounts payables, cash and loans. The financial instruments are recorded at either fair values or amortized amount on the balance sheet. The Company did not have any financial derivatives or outstanding hedging contracts as at June 30, 2026. OFF-BALANCE SHEET ARRANGEMENTS As at June 30, 2026, the Company had not entered into any off-balance sheet arrangements. DIVIDEND AND DIVIDEND POLICY The Company’s dividend policy is a key component of its long-term growth strategy. It aims to optimize capital allocation to drive business expansion while maintaining stable returns for shareholders. After successfully distributing special dividends for three consecutive years (2021-2023), the Company is introducing an enhanced dividend policy comprised of a base dividend supplemented by a variable component that adjusts based on financial performance and market conditions. Basic dividend: Subject to profitability in the previous financial year and after assessing the Company’s cash flow position and future capital requirements, the Company aims to distribute a basic dividend at a payout ratio of 30% of the net profit from the preceding financial year, with cash dividends paid annually. Variable Component: Subject to favorable market conditions and sufficient funds, the Company may distribute special dividends in addition to the basic dividend. Dividends may vary in amount and consistency or be discontinued at the Board of Directors’ discretion depending on variables including but not limited to operational cash flows, Company development requirements and strategies, spot metal prices, taxation, general market conditions and other factors.
- 24 -
MANAGEMENT’S DISCUSSION AND ANALYSIS OUTSTANDING SHARES As of June 30, 2026 the Company had 396,413,753 common shares issued and outstanding. DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING Management is responsible for the design of disclosure controls and procedures (“DC&P”) and the design of internal control over financial reporting (“ICFR”) to provide reasonable assurance that material information relating to the Company, including its consolidated subsidiaries, is made known to the Company’s certifying officers. The Company’s Chief Executive Officer and Chief Financial Officer have each evaluated the Company’s DC&P and ICFR as of June 30, 2026 and, in accordance with the requirements established under Canadian National Instrument 52-109 – Certification of Disclosure in Issuer’s Annual and Interim Filings, the Chief Executive Officer and Chief Financial Officer have concluded that these controls and procedures were effective as of June 30, 2026, and provide reasonable assurance that material information relating to the Company is made known to them by others within the Company and that the information required to be disclosed in reports that are filed or submitted under Canadian securities legislation are recorded, processed, summarized and reported within the time period specified in those rules. The Company’s Chief Executive Officer and Chief Financial Officer have used the Committee of Sponsoring Organizations of the Treadway Commission (COSO) 2013 framework to evaluate the Company’s ICFR as of June 30, 2026 and have concluded that these controls and procedures were effective as of June 30, 2026 and provide reasonable assurance that financial information is recorded, processed, summarized and reported in a timely manner. Management is required to apply its judgment in evaluating the cost-benefit relationship of possible controls and procedures. The result of the inherent limitations in all control systems means design of controls cannot provide absolute assurance that all control issues and instances of fraud will be detected. During the six months ended June 30, 2026, there were no changes in the Company’s DC&P or ICFR that materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting. RISK FACTORS There are certain risks involved in the Company’s operations, some of which are beyond the Company’s control. Aside from risks relating to business and industry, the Company’s principal operations are located within the People’s Republic of China and are governed by a legal and regulatory environment that in some respects differs from that which prevails in other countries. Readers of this MD&A should give careful consideration to the information included in this document and the Company’s audited annual consolidated financial statements and related notes. Significant risk factors for the Company are metal prices, government regulations, foreign operations, environmental compliance, the ability to obtain additional financing, risk relating to recent acquisitions, dependence on management, title to the Company’s mineral properties, natural disasters, pandemics such as COVID-19 and litigation. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks. For details of risk factors, please refer to the Company’s annual audited consolidated financial statements, and Annual Information Form filed from time to time on SEDAR+ at www.sedarplus.ca and www.hkex.com.hk. QUALIFIED PERSON Disclosure of scientific or technical information in this MD&A was reviewed and approved by Mr. Tony Guo, MMSA(QP), the Company’s Qualified Person (“QP”) as defined by National Instrument 43-101. ADDITIONAL INFORMATION Additional information as required by the Hong Kong Stock Exchange in the half-year interim report and not shown elsewhere in this report is as follows:
- 25 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
A1. PURCHASE, SALE OR REDEMPTION OF THE COMPANY’S LISTED SECURITIES
Neither the Company nor any of its subsidiaries had purchased, sold or redeemed any of the Company’s listed securities
during the six months ended June 30, 2026.
A2. SUBSTANTIAL SHAREHOLDERS
Save as disclosed below, as of June 30, 2026, the Company’s directors were not aware of any other person (other than
a director or chief executive of the Company who had an interest or short position in the shares or underlying shares
of the Company as recorded in the register kept pursuant to Section 336 of the Securities and Futures Ordinance
(Cap 571 of the Laws of Hong Kong) (“SFO”):
Name Nature of interest
Number of
Shares held
Approximate
percentage of
outstanding
shares
China National Gold Group Co., Ltd. (1) Indirect158,588,330 (2) 40.01% China National Gold Group Hong Kong LimitedRegistered Owner158,588,33040.01%
Note:
- China National Gold Group Co., Ltd. directly and wholly owns the entire issued share capital of China National Gold Group Hong Kong Limited. Therefore, the interest attributable to China National Gold Group Co., Ltd. represents its indirect interest in the Company’s shares through its equity interest in China National Gold Group Hong Kong Limited.
- Information relating to registered and indirect ownership of the Company’s shares is provided by China National Gold Group Co., Ltd. A3. DIRECTORS’ AND CHIEF EXECUTIVES’ INTERESTS IN SHARES AND STOCK OPTIONS As of June 30, 2026, the interests of the directors and chief executive of the Company in the share capital, underlying shares and debentures of the Company or its associated corporations (within the meaning of Part XV of the SFO), as recorded in the register required to be kept by the Company pursuant to Section 352 of the SFO, or as otherwise notified to the Company and the Hong Kong Stock Exchange pursuant to the Model Code for Securities Transactions by Directors of Listed Issuer, were as follows: SHARES NamePositionCompany Number of shares held Nature of interest Approximate percentage of interest in the Company
Yingbin Ian He DirectorChina Gold International Resources Corp. Ltd. 50,000Personal0.013%
Other than as disclosed above, none of the directors, chief executive or their associates had any interests or short positions in any shares, underlying shares or debentures of the Company or its associated corporations as of June 30, 2026. A4. STOCK OPTION PLAN The Company adopted an incentive stock option plan with approval from its shareholders and pursuant to the policies of the Toronto Stock Exchange dated May 9, 2007. All options expired on June 1, 2015 and the 2007 Stock Option Plan has ceased to be in effect.
- 26 -
MANAGEMENT’S DISCUSSION AND ANALYSIS A5. EMOLUMENT POLICY The Company’s executive emolument policy and compensation program is administered by the Compensation and Benefits Committee. The Compensation and Benefits Committee reviews levels of cash compensation as needed and at least annually, and makes recommendations to the Board to adjust cash compensation in light of merit, qualifications and competence. The Compensation and Benefits Committee also reviews the corporate goals and objectives relevant to the compensation of the senior executive officers as needed and at least annually and based on recommendations from the Chief Executive Officer and other members of the management team. The Compensation and Benefits Committee makes its determinations as to overall compensation levels on the basis of both available third party data regarding comparable compensation at similar size companies as well as their own industry experience and the Company’s hiring and retention needs. Decisions relating to executive compensation are reported by the Compensation and Benefits Committee to the Board for approval. The Company’s director emolument policy is administered by the Compensation and Benefits Committee with regard to comparable market statistics. Decisions relating to the compensation of directors are reported by the Compensation and Benefits Committee to the Board for approval. As of June 30, 2026, the Company had 2,351 employees working at various locations. The emolument policy for the Company’s employees is determined on a department by department basis with the Chief Executive Officer determining the emoluments for employees and managers based on merit, qualifications and the Company’s hiring and retention needs. A6. COMPLIANCE WITH CORPORATE GOVERNANCE CODE The Company has, throughout the six months ended June 30, 2026, applied the principles and complied with the requirements of its corporate governance practices as defined by the Board and all applicable statutory, regulatory and stock exchange listings standards, in particular, the code provisions set out in the Corporate Governance Code contained in Appendix 14 of the Rules Governing the Listing Securities of The Stock Exchange of Hong Kong Limited (the “Hong Kong Listing Rules”). A7. COMPLIANCE WITH MODEL CODE ON DIRECTORS’ SECURITIES TRANSACTIONS The Company has adopted policies regarding directors’ securities transactions in its Corporate Disclosure, Confidentiality and Securities Trading Policy that has terms which are no less exacting than those set out in the Model Code for Securities Transactions by Directors of Listed Issuers contained in Appendix 10 to the Hong Kong Listing Rules. After specific enquiry with all members of the Board, the Board confirms that all of the directors of the Company have complied with the required policies in the Company’s Corporate Disclosure, Confidentiality and Securities Trading Policy throughout the six months ended June 30, 2026. A8. INTERIM DIVIDEND The Board did not recommend the payment of interim dividends in respect of the six months ended June 30, 2026. A9. AUDIT COMMITTEE Pursuant to the requirements under the Hong Kong Listing Rules, the Company has established an audit committee (the “Audit Committee”) comprising all the existing Independent Non-executive Directors, namely Ian He (chairman of the Audit Committee), Wei Shao, Bielin Shi and Ruixia Han. The Audit Committee has reviewed and discussed with the Company’s auditors the unaudited interim results of the Group for the three and six months ended June 30, 2026. August 13, 2026
- 27 -
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME For The Three And Six Months Ended June 30, 2026 (Unaudited) Three months ended June 30,Six months ended June 30, NOTES2026202520262025 US$'000US$'000US$'000US$'000 (unaudited)(unaudited)(unaudited)(unaudited) Revenue3461,013307,269914,216580,365 Cost of sales(133,675)(147,872)(294,108)(303,315)
Mine operating earnings327,338159,397620,108277,050
Expenses General and administrative expenses4(16,824)(12,068)(31,924)(24,300) Exploration and evaluation expenditure(61)(133)(232)(641) Research and development expenses(6,463)(5,256)(11,922)(8,552)
(23,348)(17,457)(44,078)(33,493)
Income from operations303,990141,940576,030243,557
Other income (expenses) Foreign exchange loss, net4,796(2,037)2,332(4,691) Interest and other income7,4024,9169,1056,725 Other expenses5–(987)–(987) Finance costs6(3,365)(4,580)(7,430)(9,582)
8,833(2,688)4,007(8,535)
Profit before income tax312,823139,252580,037235,022 Income tax expenses7(37,070)(22,909)(67,913)(32,700)
Profit for the period275,753116,343512,124202,322
Other comprehensive income for the period Item that will not be reclassified to profit or loss: Fair value (loss) gain on equity instruments at fair value through other comprehensive income (“FVTOCI”)(2,195)14,556(32,483)17,920 Item that may be reclassified subsequently to profit or loss: Exchange difference arising on translation7,3664,89233,5957,377
5,17119,4481,11225,297
- 28 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS
AND OTHER COMPREHENSIVE INCOME
Three months ended June 30,Six months ended June 30,
NOTES2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Total comprehensive income for the period280,924135,791513,236227,619
Profit for the period attributable to Non-controlling interests2,3491,0624,7612,028 Owners of the Company273,404115,281507,363200,294
275,753116,343512,124202,322
Total comprehensive income for
the period attributable to
Non-controlling interests2,3491,0624,7612,028
Owners of the Company278,575134,729508,475225,591
280,924135,791513,236227,619
Earnings per share – Basic and diluted
(US cents)968.9729.08127.9950.53
Weighted average number of common shares – Basic and diluted9396,413,753396,413,753396,413,753396,413,753
- 29 -
CONDENSED CONSOLIDATED STATEMENT OF
FINANCIAL POSITION
At June 30, 2026 (Unaudited)
NOTES
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Current assets
Cash and cash equivalents586,417399,402
Restricted bank balances43,48034,162
Term deposits10403,765305,884
Trade and other receivables1116,2368,246
Prepaid expenses and deposits127,1661,794
Inventories13271,820294,536
1,328,8841,044,024
Non-current assets Prepaid expenses and deposits1249074 Right-of-use assets14103,816104,519 Equity instruments at FVTOCI19101,398133,875 Property, plant and equipment141,338,1531,339,447 Intangible assets14714,777724,647 Other non-current assets10,2679,949
2,268,9012,312,511
Total assets3,597,7853,356,535
Current liabilities Accounts and other payables and accrued expenses15179,542181,828 Contract liabilities4810,063 Borrowings16169,068217,004 Entrustment Loan payable18(a)29,36528,454 Lease liabilities1,5171,417 Tax liabilities39,45025,253
418,990464,019
Net current assets909,894580,005
Total assets less current liabilities3,178,7952,892,516
- 30 -
At June 30, 2026 (Unaudited)
CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION
NOTES
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Non-current liabilities
Accounts and other payables and accrued expenses1517,48725,419
Borrowings16264,893287,981
Lease liabilities12,46212,628
Deferred tax liabilities124,940135,665
Deferred income1919
Environmental rehabilitation97,60893,778
517,409555,490
Total liabilities936,3991,019,509
Owners’ equity Share capital171,229,0611,229,061 Reserves274,950266,985 Retained profits1,127,291813,095
2,631,3022,309,141 Non-controlling interests30,08427,885
Total owners’ equity2,661,3862,337,026
Total liabilities and owners’ equity3,597,7853,356,535
The condensed consolidated financial statements were approved and authorised for issue by the Board of Directors on August 13, 2026 and are signed on its behalf by: (Signed by)(Signed by)
Chenguang HouYingbin Ian He DirectorDirector
- 31 -
CONDENSED CONSOLIDATED STATEMENT OF
CHANGES IN EQUITY
For The Three And Six Months Ended June 30, 2026 (Unaudited)
Attributable to owners of the Company
Number of
shares
Share
capital
Equity
reserve
Investment
revaluation
reserve
Exchange
reserve
Statutory
reserve
Retained
profitsSubtotal
Non-
controlling
interests
Total
owners’
equity
US$'000US$'000US$'000US$'000US$'000US$'000US$'000US$'000US$'000
At January 1, 2025396,413,7531,229,06111,17927,589(70,298)131,267433,6401,762,43823,7681,786,206
Profit for the period––––––200,294200,2942,028202,322 Fair value gain on equity instruments at FVTOCI–––17,920–––17,920–17,920 Exchange difference arising on translation––––7,377––7,377–7,377
Total comprehensive income for the period–––17,9207,377–200,294225,5912,028227,619
Transfer to statutory reserve
– safety production fund–––––2,544(2,544)–––
Dividends paid to shareholders of the Company––––––(31,713)(31,713)–(31,713)
Dividends paid to a non-controlling shareholder––––––––(1,237)(1,237)
At June 30, 2025 (unaudited)396,413,7531,229,06111,17945,509(62,921)133,811599,6771,956,31624,5591,980,875
At January 1, 2026396,413,7531,229,06111,179113,053(44,305)187,058813,0952,309,14127,8852,337,026
Profit for the period––––––507,363507,3634,761512,124 Fair value gain on equity instruments at FVTOCI–––(32,483)–––(32,483)–(32,483) Exchange difference arising on translation––––33,595––33,595–33,595
Total comprehensive income for the period–––(32,483)33,595–507,363508,4754,761513,236
Transfer to statutory reserve
– safety production fund–––––9,650(9,650)–––
Transfer to retained earnings
– safety production fund–––––(2,797)2,797–––
Dividends paid to shareholders of the Company––––––(186,314)(186,314)–(186,314)
Dividends declared to a
non-controlling shareholder––––––––(2,121)(2,121)
Dividends paid to a non-controlling shareholder––––––––(441)(441)
At June 30, 2026 (unaudited)396,413,7531,229,06111,17980,570(10,710)193,9111,127,2912,631,30230,0842,661,386
- 32 -
CONDENSED CONSOLIDATED STATEMENT OF
CASH FLOWS
For The Three And Six Months Ended June 30, 2026 (Unaudited)
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Net cash from operating activities286,477191,318555,180334,848
Investing activities Interest income received2,493–4,044737 Payment for acquisition of property, plant and equipment(6,721)(4,581)(22,774)(29,301) Proceeds from disposal of property, plant and equipment–12312 Payment for right-of-use assets(1)(17,674)(1)(17,674) Payment for land use right(5,072)(2,688)(5,072)(2,688) Placement of term deposits(146,711)(20,756)(348,170)(132,240) Withdrawal of term deposits110,034–261,12848,774
Net cash used in investing activities(45,978)(45,687)(110,842)(132,380)
Financing activities Proceeds from borrowings30,00079,00030,00079,000 Repayment of borrowings(108,701)(124,170)(113,701)(124,170) Dividends paid to shareholders of the Company(186,314)(31,713)(186,314)(31,713) Dividends paid to a non-controlling shareholder–(929)(441)(1,237) Payment for lease(418)(25)(932)(52)
Cash used in financing activities(265,433)(77,837)(271,388)(78,172)
Net (decrease)/increase in cash and cash
equivalents(24,934)67,794172,950124,296
Cash and cash equivalents, beginning of period603,438240,492399,402183,779
Effect of foreign exchange rate changes on
cash and cash equivalents7,91390914,0651,120
Cash and cash equivalents, end of period586,417309,195586,417309,195
Cash and cash equivalents are comprised of
cash and bank deposits586,417309,195586,417309,195
- 33 -
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
For The Three And Six Months Ended June 30, 2026 (Unaudited)
- BASIS OF PREPARATION AND SIGNIFICANT EVENT DURING THE CURRENT PERIOD 1.1 Basis of preparation China Gold International Resources Corp. Ltd., (the “Company”) is a publicly listed company incorporated in British Columbia, Canada on May 31, 2000 with limited liability under the legislation of the Province of British Columbia and its shares are listed on the Toronto Stock Exchange and The Stock Exchange of Hong Kong Limited (the “Stock Exchange”). The Company together with its subsidiaries (collectively referred to as the “Group”) is principally engaged in the acquisition, exploration, development and mining of mineral resources in the People’s Republic of China (the “PRC”). The Group considers that China National Gold Group Co., Ltd. (“CNG”), a state owned company registered in Beijing, the PRC which is controlled by State-owned Assets Supervision and Administration Commission of the State Council of the PRC, is able to exercise significant influence over the Company. The head office, principal address and registered and records office of the Company are located at Suite 1780, 400 Burrard Street, Vancouver, British Columbia, Canada, V6C 3A6. The condensed consolidated financial statements have been prepared in accordance with the applicable disclosure requirements of the Rules Governing the Listing of Securities on the Stock Exchange as well as International Accounting Standard 34 Interim Financial Reporting issued by the International Accounting Standards Board (“IASB”), which should be read in conjunction with the consolidated financial statements for the year ended December 31, 2025. The condensed consolidated financial statements are presented in United States Dollars (“US$”), which is the functional currency of the Company. 1.2 Significant event during the current period (a) A localised slope instability event On May 22, 2026, a localised slope instability event occurred at its CSH Gold Mine in Inner Mongolia. The event was primarily attributed to heavy rainfall in the area during May 15 to 16, 2026, combined with complex geological conditions, which triggered a localized geological hazard. Mining activities at the open pit remain temporarily suspended pending further geotechnical and operational assessment. Processing operations continue utilising available low-grade ore stockpiles to maintain production. The Company has engaged external geotechnical specialists and professional consultants to assist with the ongoing assessment and remediation planning. The Company is currently assessing the potential impact of the event on mining operations and future production plans. Based on the information currently available, the Company does not expect the event to materially affect its annual production guidance. The assessment remains ongoing.
- 34 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
- BASIS OF PREPARATION AND SIGNIFICANT EVENT DURING THE CURRENT PERIOD (Cont’d) 1.2 Significant event during the current period (Cont’d) (b) Updates on Mineral Resource and Reserve Estimates The Company has completed mineral resource and reserve estimate update and the NI 43-101 Technical Report with respect to the Mineral Resource and Reserve Estimates Update for the Jiama Copper Polymetallic Project in Tibet Autonomous Region, the People’s Republic of China. Mineral Resource estimate and a Mineral Reserve estimate, dated effective June 30, 2026, has been completed by Changchun Gold Design Institute in accordance with the CIM Definition Standards and Best Practice Guidelines under NI 43-101. The updated Mineral Resource significantly expands the Project’s scale and development potential, providing a robust foundation for future production expansion, mine life extension and further technical studies on larger-scale mining scenarios. Please refer to the Company’s announcement dated June 30, 2026 for details on the updates on Mineral Resources and Reserve Estimates.
- ACCOUNTING POLICIES AND APPLICATION OF AMENDMENTS TO INTERNATIONAL FINANCIAL REPORTING STANDARDS (“IFRSS”) The condensed consolidated financial statements have been prepared on the historical cost basis except for certain financial instruments, which are measured at fair values. Except as described below, the accounting policies and methods of computation used in the condensed consolidated financial statements for the six months ended June 30, 2026 are the same as those presented in the Group’s annual financial statements for the year ended December 31, 2025. In the current interim period, the Group has applied the following amendments to IFRSs issued by IASB, which are mandatorily effective for the Group’s annual period beginning on January 1, 2026 for the preparation of the Group’s condensed consolidated financial statements: Amendments to IFRS 9 and IFRS 7Amendments to the Classification and Measurement of Financial Instrument Amendments to IFRS 9 and IFRS 7Contracts Referencing Nature-dependent Electricity Amendments to IFRS Accounting Standards Annual Improvement to IFRS Accounting Standards – Volume 11 The application of the amendments to IFRSs in the current interim period has had no material impact on the Group’s financial positions and performance for the current and prior periods and/or on the disclosures set out in these condensed consolidated financial statements.
- 35 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
3. REVENUE AND SEGMENT INFORMATION
Revenue
(i) Disaggregation of revenue from contracts with customers
The following is an analysis of the Group’s revenue from its major products and services:
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
At a point in time
Gold doré bars97,75084,576224,455163,670
Copper189,178110,720359,837204,216
Other by-products174,085111,973329,924212,479
Total revenue461,013307,269914,216580,365
(ii) Performance obligations for contracts with customers The Group sells gold doré bars, copper and other by-products directly to customers. Revenue is recognised at a point in time when control of the gold doré bars, copper and other by-products is passed to customers, i.e. when the products are delivered and titles have passed to customers. A contract liability represents the Group’s obligation to transfer goods or services to a customer for which the Group has received consideration (or an amount of consideration is due) from the customer. Segment information IFRS 8 requires operating segments to be identified on the basis of internal reports that are regularly reviewed by the chief operating decision-maker (“CODM”) to allocate resources to the segments and to assess their performance. The CODM, who is responsible for allocating resources and assessing performance of the operating segments, has been defined as the executive directors of the Company. The CODM has identified two operating and reportable segments as follows: (i) The mine-produced gold segment – the production of gold doré bars through the Group’s integrated processes, i.e., mining, metallurgical processing, production and selling of gold doré bars to external clients. (ii) The mine-produced copper concentrate segment – the production of copper concentrate including other by- products through the Group’s integrated processes, i.e., mining, metallurgical processing, production and selling of copper concentrate including other by-products to external clients.
- 36 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
3. REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information (Cont’d)
Information regarding the above segments is reported below:
(a) Segment revenue and results
The following is an analysis of the Group’s revenue and results by operating and reportable segment.
For the six months ended June 30, 2026
Mine-produced
gold
Mine-produced
copper
concentrateSegment totalUnallocatedConsolidated
US$'000US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)(unaudited)
Revenue – external and segment revenue224,455689,761914,216–914,216
Cost of sales(84,756)(209,352)(294,108)–(294,108)
Mining operating earnings139,699480,409620,108–620,108
Income (loss) from operations139,467438,750578,217(2,187)576,030 Foreign exchange (loss) gain, net3,4541,5655,019(2,687)2,332 Interest and other income2,7983,4176,2152,8909,105 Finance costs(156)(4,935)(5,091)(2,339)(7,430)
Profit (loss) before income tax145,563438,797584,360(4,323)580,037
- 37 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
3. REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information (Cont’d)
(a) Segment revenue and results (Cont’d)
For the six months ended June 30, 2025
Mine-produced
gold
Mine-produced
copper
concentrateSegment totalUnallocatedConsolidated
US$'000US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)(unaudited)
Revenue – external and segment revenue163,670416,695580,365–580,365
Cost of sales(85,622)(217,693)(303,315)–(303,315)
Mining operating earnings78,048199,002277,050–277,050
Income (loss) from operations77,406168,133245,539(1,982)243,557 Foreign exchange (loss) gain, net(4,608)(85)(4,693)2(4,691) Interest and other income1,6692,0623,7312,9946,725 Other expenses–(987)(987)–(987) Finance costs(172)(7,263)(7,435)(2,147)(9,582)
Profit (loss) before income tax74,295161,860236,155(1,133)235,022
The accounting policies of the operating segments are the same as the Group’s accounting policies. Segment results represent profit (loss) before income tax, without allocation of certain general and administrative expenses, foreign exchange gain (loss), interest and other income and finance costs, attributable to the respective segment. This is the measure reported to the CODM for the purposes of resource allocation and performance assessment. There are no inter-segment sales for the six months ended June 30, 2026 and 2025.
- 38 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
3. REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information (Cont’d)
(b) Segment assets and liabilities
The following is an analysis of the Group’s assets and liabilities by segment representing assets/liabilities directly
attributable to respective segment:
Mine-produced
gold
Mine-produced
copper
concentrateSegment totalUnallocatedConsolidated
US$'000US$'000US$'000US$'000US$'000
As of June 30, 2026
(unaudited)
Total assets822,0262,633,5193,455,545142,2403,597,785
Total liabilities47,256811,577858,83377,566936,399
As of December 31, 2025 (audited) Total assets750,9102,451,1313,202,041154,4943,356,535 Total liabilities50,237887,806938,04381,4661,019,509
For the purposes of monitoring segment performance and allocating resources between segments: • all assets are allocated to operating segments other than certain of cash and cash equivalents, other receivables, prepaid expenses and deposits, dividend receivables, right-of-use assets, property, plant and equipment and equity instruments at FVTOCI; and • all liabilities are allocated to operating segments other than other payables and accrued expenses, lease liabilities, deferred income and certain borrowings.
- 39 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
4. GENERAL AND ADMINISTRATIVE EXPENSES
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Administration and office expenses3,9621,4645,8624,145
Depreciation of property, plant and
equipment1,6741,5673,5503,165
Depreciation of right-of-use assets13–2624
Professional fees5871,1211,2131,635
Salaries and benefits5,3165,02810,4019,987
Others5,2722,88810,8725,344
Total general and administrative expenses16,82412,06831,92424,300
- OTHER EXPENSES Three months ended June 30,Six months ended June 30, 2026202520262025 US$'000US$'000US$'000US$'000 (unaudited)(unaudited)(unaudited)(unaudited) Provision for litigation compensation and related interest charge–830–830 Others–157–157
Total other expenses–987–987
- 40 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
6. FINANCE COSTS
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Interests on borrowings2,7853,8746,2768,150
Interests on provision for mining rights276199429398
Interests on lease liabilities661027921
Accretion on environmental rehabilitation4266828451,366
3,5534,7657,8299,935 Less: Amounts capitalised to property, plant and equipment(188)(185)(399)(353)
Total finance costs3,3654,5807,4309,582
- INCOME TAX EXPENSES
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Current tax:
PRC Enterprise Income Tax (“EIT”)33,36515,27463,30327,651
PRC withholding income tax
on dividend paid6,414–6,414– Underprovision of PRC EIT in prior year5,4775788,921578
45,25615,85278,63828,229
Deferred tax: PRC EIT(8,186)7,057(10,725)4,471
(8,186)7,057(10,725)4,471
Total income tax expenses37,07022,90967,91332,700
- 41 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
8. DIVIDEND
During the six months ended June 30, 2026, a dividend in respect of the year ended December 31, 2025 of US$0.47
per common share (including basic dividend of US$0.35 per common share and special dividend of US$0.12 per
common share) in an aggregate amount of US$186,314,000 was declared and paid to the shareholders of the Company.
During the six months ended June 30, 2025, a dividend in respect of the year ended December 31, 2024 of US$0.08
per common share (including basic dividend of US$0.05 per common share and special dividend of US$0.03 per
common share) in an aggregate amount of US$31,713,000 was declared and paid to the shareholders of the Company.
9. EARNINGS PER SHARE
Profit used in determining earnings per share are presented below:
Three months ended June 30,Six months ended June 30,
2026202520262025
(unaudited)(unaudited)(unaudited)(unaudited)
Profit for the period attributable to owners
of the Company for the purposes of basic
earnings per share (US$'000)273,404115,281507,363200,294
Weighted average number of shares, basic396,413,753396,413,753396,413,753396,413,753
Basic earnings per share
(US cents)68.9729.08127.9950.53
The Group has no outstanding potential dilutive instruments issued as at June 30, 2026 and 2025 and during the three and six months ended June 30, 2026 and 2025. Therefore, no diluted earnings per share is presented. 10. TERM DEPOSITS As at June 30, 2026, term deposits with original maturity of one year (December 31, 2025: one year) carries interest at fixed market rate ranging from 1.2% to 1.7% per annum (December 31, 2025: ranging from 1.15% to 1.7%) per annum.
- 42 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
11. TRADE AND OTHER RECEIVABLES
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Trade receivables4,2252,111
Less: allowance for credit losses(295)(344)
3,9301,767 Amounts due from related companies (note 18(a)) (1) 3,2732,762 Other receivables9,0333,717
Total trade and other receivables16,2368,246
(1) The amounts are unsecured, interest free and repayable on demand.
The Group allows an average credit period of 30 days and 180 days to its trade customers.
Below is an aged analysis of trade receivables (net of allowance for credit losses) presented based on invoice dates,
which approximated the respective revenue recognition dates, at the end of the reporting period:
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Less than 30 days2,047714
31 to 90 days425241
91 to 180 days4803
Over 180 days978809
3,9301,767
- 43 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
12. PREPAID EXPENSES AND DEPOSITS
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Deposit paid for acquisition of property, plant and equipment49074
Other prepayment and deposits7,1661,794
7,6561,868
Less: Amounts that will be settled or utilised within one year
shown under current assets(7,166)(1,794)
Amounts that will be settled or utilised for more than one year
shown under non-current assets49074
- INVENTORIES
June 30,
2026 December 31, 2025 US$'000US$'000 (unaudited)(audited) Gold in process235,525249,498 Gold doré bars–8,283 Consumables7,6929,713 Copper concentrate4,3925,017 Spare parts24,21122,025
Total inventories271,820294,536
Cost of inventory sold totaling US$132 million and US$291 million for the three and six months ended June 30, 2026, respectively (three and six months ended June 30, 2025: US$141 million and US$289 million, respectively) was recognised in cost of sales.
- 44 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
14. PROPERTY, PLANT AND EQUIPMENT/MINING RIGHTS/RIGHT-OF-USE ASSETS
During the six months ended June 30, 2026, the Group incurred approximately US$17.8 million on construction in
progress (for the six months ended June 30, 2025: approximately US$1.8 million) and approximately US$0.8 million
on mineral assets (for the six months ended June 30, 2025: approximately US$6.4 million), respectively.
Depreciation of property, plant and equipment was US$31.9 million and US$62.1 million for the three and six months
ended June 30, 2026, respectively (for the three and six months ended June 30, 2025: US$37.0 million and US$70.1
million, respectively). The depreciation amount was partly recognised in cost of sales, general and administrative
expenses, research and development expenses and partly capitalised in inventory.
No addition of mining rights was incurred during the six months ended June 30, 2026 and 2025. Amortisation of
mining rights was US$13.8 million and US$19.9 million for the three and six months ended June 30, 2026, respectively
(for the three and months ended June 30, 2025: US$7.3 million and US$14.2 million, respectively). The amortisation
amounts were recognised in cost of sales.
During the six months ended June 30, 2025, the Group paid farmland use tax and grassland compensation fee in
relation to leasehold lands and recognised right-of-use assets of US$41.7 million. No payment of farmland use tax
and grassland compensation fee was paid and no respective right-of-use assets has been recognised during the six
months ended June 30, 2026.
15. ACCOUNTS AND OTHER PAYABLES AND ACCRUED EXPENSES
Accounts and other payables and accrued expenses comprise the following:
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Accounts payable35,52836,021
Construction cost payables88,46691,181
Mining loyalties payable (Note)37,95150,577
Payable for acquisition of a mining right–1,201
Payroll and benefit payables5,4292,085
Mining cost accrual2,8711,544
Other accruals3,5742,472
Other tax payable17,71813,006
Other payables5,4929,160
Total accounts and other payables and accrued expenses197,029207,247
Current179,542181,828 Non-current17,48725,419
197,029207,247
- 45 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
15. ACCOUNTS AND OTHER PAYABLES AND ACCRUED EXPENSES (Cont’d)
Note:
As stipulated in an agreement with local authorities and relevant government notices. Since 2017, the Group is required to pay royalties to
the PRC government for the use of state-owned natural resources in relation to the Jiama Mine, calculated based on invoiced revenue and
ore yield. The royalties payable for 2017 to May 2023 was allowed to be settled with six fixed annual instalments of RMB61.3 million each,
totalling RMB368 million with first instalment payable from 2024 and final instalment due in 2029. The royalties from May 2023 onwards
are payable annually.
The following is an aged analysis of the accounts payable presented based on invoice date at the end of the reporting
period:
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Less than 30 days10,56720,779
31 to 90 days8,5254,561
91 to 180 days7,6331,593
Over 180 days8,8039,088
Total accounts payable35,52836,021
The credit period for bills payable is 180 days from the issue date.
16. BORROWINGS
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Bank loans407,533422,467
Loans payable to a CNG’s subsidiary (note 18(a))26,42882,518
433,961504,985
- 46 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
16. BORROWINGS (Cont’d)
The borrowings are repayable as follows:
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Carrying amount repayable within one year169,068217,004
Carrying amount repayable within one to two years110,118107,415
Carrying amount repayable within two to five years99,915111,756
Carrying amount repayable over five years54,86068,810
433,961504,985 Less: Amounts due within one year (shown under current liabilities)(169,068)(217,004)
Amounts shown under non-current liabilities264,893287,981
Analysed as: Secured185,806197,119 Unsecured248,155307,866
433,961504,985
The carrying values of the pledged assets to secure borrowings by the Group are as follows:
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Mining rights712,960723,579
Borrowings carry interest at effective interest rates ranging from 1.25% to 4.36% (December 31, 2025: 1.25% to 4.36%) per annum. In respect of a bank loan with a carrying amount of US$333,533,000 as at June 30, 2026 (December 31, 2025: US$343,467,000), the Group is required to comply with certain significant financial covenants throughout the continuance of the relevant bank loans and/or as long as the bank loans are outstanding. The Group has complied with all covenants throughout the reporting period.
- 47 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
17. SHARE CAPITAL
Common shares
(i) Authorised – Unlimited common shares without par value
(ii) Issued and outstanding
Number of sharesAmount
US$'000
Issued and fully paid:
At January 1, 2025, December 31, 2025 and June 30, 2026396,413,7531,229,061
- SIGNIFICANT RELATED PARTY TRANSACTIONS
Related parties are those parties that have the ability to control the other party or exercise significant influence in making
financial and operation decisions. Parties are also considered to be related if they are subject to common control. CNG,
a state owned company registered in Beijing, the PRC, which is controlled by State-owned Assets Supervision and
Administration Commission of the State Council of the PRC, is able to exercise significant influence over the Company.
In accordance with IAS 24 “Related party disclosures”, the management believes that information relating to related
party transactions have been adequately disclosed in conformity of the IFRSs.
In addition to the related party transactions and balances shown elsewhere in these condensed consolidated financial
statements, the following is a summary of significant related party transactions entered into in the ordinary course of
business between the Group and its related parties for the three and six months ended June 30, 2026 and 2025,
and related party balances as at June 30, 2026 and December 31, 2025.
Name and relationship with related parties during the period/year are as follows:
CNG owned the following percentages of outstanding common shares of the Company:
June 30,
2026 December 31, 2025 %% CNG40.0140.01
- 48 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
18. SIGNIFICANT RELATED PARTY TRANSACTIONS (Cont’d)
(a) Transactions/balances with CNG and its subsidiaries
The Group had the following significant transactions with CNG and CNG’s subsidiaries:
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Gold doré bars sales by the Group97,75084,576224,455163,670
Copper and other by-products sales
by the Group361,586220,870686,453412,947
Provision of transportation services
by the Group6885671,2931,059
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Construction, stripping and mining
services provided to the Group14,25034,13833,86166,705
Accrued property management fee119113236226
Commitment fee151147299296
Interest income8071,3731,6312,598
Interest expenses on loans payable
to a CNG’s subsidiary and
entrusted loan payable5786221,2081,232
Interest expenses on lease liabilities5111121
- 49 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
18. SIGNIFICANT RELATED PARTY TRANSACTIONS (Cont’d)
(a) Transactions/balances with CNG and its subsidiaries (Cont’d)
The Group has the following significant balances with CNG and its subsidiaries at the end of each reporting period:
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Assets
Amounts due from related companies (note 11)3,2732,762
Cash and cash equivalents held in a CNG’s subsidiary333,524179,182
Term deposits held in a CNG’s subsidiary132,141206,294
468,938388,238
Other than the cash and cash equivalents and restricted balances held in a CNG’s subsidiary, the remaining
amounts due from related companies as at June 30, 2026 and December 31, 2025, which are included in trade
and other receivables are non-interest bearing, unsecured and payable on demand.
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Liabilities
Entrusted loan payable to a CNG’s subsidiary29,36528,454
Loans payable to a CNG’s subsidiary26,42882,518
Construction costs payable to CNG’s subsidiaries10,82612,207
Trade payable to CNG’s subsidiaries2,1212,246
Amount due to CNG1,8511,786
Contract liabilities with a CNG’s subsidiary2110,025
Lease liabilities to a CNG’s subsidiary496469
Total amounts due to CNG’s subsidiaries71,108137,705
Trade payable, construction costs payable and contract liabilities to CNG’s subsidiaries are in trade nature, non-interest bearing and unsecured. Amount due to CNG included in other payables is non-trade in nature, non-interest bearing, unsecured and have no fixed term of repayment. Entrusted loan payable, loans payable and lease liabilities to CNG and its subsidiaries are non-trade in nature, interest-bearing, unsecured and have fixed term of repayment.
- 50 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
18. SIGNIFICANT RELATED PARTY TRANSACTIONS (Cont’d)
(b) Compensation of key management personnel
The Group has the following compensation to key management personnel during the period:
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Salaries and other benefits8884195186
Post-employment benefits651312
9489208198
- FINANCIAL INSTRUMENTS As at June 30, 2026 and December 31, 2025, the Group’s investments in equity securities include equity securities listed on the Stock Exchange and unlisted companies incorporated in the PRC. Investment in equity securities listed on the Stock Exchange of US$101,195,000 (December 31, 2025: US$133,678,000) is measured based on the unadjusted quoted price available on the Stock Exchange (Level 1 fair value measurement). The Group’s investment in listed equity securities represent investment in a company engaged in mining, processing and trading of nonferrous metals registered in Hong Kong, PRC. In addition, investment in an unlisted company incorporated in the PRC of US$203,000 (December 31, 2025: US$197,000) are measured at fair value based on Level 3 inputs. The Group considers that the carrying amounts of financial assets and financial liabilities recorded at amortised cost in the condensed consolidated financial statements approximate their fair values.
- 51 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
20. CONTINGENCIES
Except as described below, there has been no significant update of the contingencies as detailed in the Group’s annual
financial statements for the year ended December 31, 2025.
Litigation with Huaxin Construction Group Co., Ltd. (“Huaxin”) and Zhongxinfang
During the year ended December 31, 2020, there was a construction contract dispute between independent third
parties including Huaxin (the constructor), Zhongxinfang, and the Company’s subsidiary, Tibet Huatailong Mining
Development Co. Ltd. (“Huatailong”). The land use right of a composite project under the construction contract
was transferred from Huatailong to Zhongxinfang in 2019 pursuant to the cooperation agreement (the “Cooperation
Agreement”) whereby the Group agreed to transfer the land use right for the development and Zhongxinfang agreed
to compensate the Group by transferring a block of the buildings and twenty car parks (the “New Premises”) to the
Group within two years from the date of the Cooperation Agreement (the “Land Exchange”).
(a) Litigations with Huaxin and Zhongxinfang for the construction costs
Since 2020, there were legal proceedings on the Construction Contract between Huaxin, Zhongxinfang and
Huatailong of which details were disclosed in the Group’s annual financial statements for the year ended
December 31, 2025.
In 2025, Huatailong has paid to the Lhasa Intermediate Court the full compensation amount of RMB178 million
(equivalent to US$24,869,000) for the settlement of accumulated litigation compensation and additional interest
recognised, of which RMB35 million (equivalent to US$4,870,000) was paid to Huaxin as partial settlement and
the remaining RMB143 million has been frozen by the Lhasa Intermediate Court pending for the resolution of a
separate countersuit by Huatailong against Zhongxinfang as further detail in note 20(b) below.
On September 16, 2025, subsequent to the full settlement payment mentioned above, Huatailong received
a civil ruling from the People’s Court of Duilongdeqing District, Lhasa (“PCDDL”), which ordered the freezing
of certain bank accounts of Huatailong with a total value of approximately RMB59.6 million (equivalent to
approximately US$8,320,000). This freezing is a pre-litigation asset preservation measure initiated by Huaxin in
connection with a potential lawsuit to be filed by Huaxin on claiming the remaining unpaid contract balance of
the Construction Contract of approximately RMB52.0 million and accrued interest, which Huaxin is now pursuing
against Huatailong after being unable to recover it from the insolvent co-obligor, Zhongxinfang. The freezing
period is one year, from August 29, 2025 to August 28, 2026.
On January 6, 2026, Huaxin formally filed its claim against Huatailong. On July 1, 2026, PCDDL suspended
the proceedings, citing that the outcome is contingent upon a separate Lhasa Intermediate Court case. In that
related action, Huatailong is suing Huaxin for RMB100 million in quality defect damages and RMB74 million in
unreasonable pricing increment; judicial appraisal is ongoing.
As of the end of the reporting period, the aggregated amounts frozen remains approximately RMB29.80 million
(equivalent to US$4,375,000). The freezing has not materially impacted Huatailong’s normal operations due to
sufficient working capitals maintained in other accounts. No outstanding litigation compensation payable exists
in relation to litigation with Huaxin as of June 30, 2026.
- 52 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
20. CONTINGENCIES (Cont’d)
Litigation with Huaxin Construction Group Co., Ltd. (“Huaxin”) and Zhongxinfang (Cont’d)
(b) Litigations with Zhongxinfang for the recovery of construction costs
During the year ended December 31, 2020, Huatailong filed a lawsuit against Zhongxinfang for the recovery of the
construction costs of RMB149 million (equivalents to US$21,319,000) that shall be jointly borne by Huatailong.
After the first instance adjudication and appeals by Zhongxinfang, on June 20, 2023, Tibet High Court adjudicated
that the September 2020 Adjudication sustained (the “June 2023 Zhongxinfang Final Instance Adjudication”) and
Zhongxinfang should pay relevant compensation to Huatailong within 15 days from the effective date of the June
2023 Zhongxinfang Final Instance Adjudication. On 15 September 2023, Huatailong applied for an enforcement
of the June 2023 Zhongxinfang Final Instance Adjudication (the “September 2023 Enforcement”) and as at June
30, 2026 and up to the date of these condensed consolidated financial statements are authorised for issue,
Zhongxinfang has not yet paid the compensation to Huatailong and the September 2023 Enforcement is not
executed mainly because Zhongxinfang is involved in several litigations and there are no executable properties.
(c) Litigations with Zhongxinfang for the delivery of New Premises and recovery of tax and other surcharge
During 2020 and 2021, Huatailong proceeded lawsuits against Zhongxinfang concerning (i) the delivery of
certain premises (the “New Premises”) and a penalty, and (ii) the recovery of Tax and Other Surcharges paid
by Huatailong amounting to RMB46 million (equivalent to USD6.4 million), respectively. Pre-litigation asset
preservation measures are in place with (i) the New Premises comprising a block of buildings and twenty car
parks from Zhongxinfang were frozen and (ii) the value of certain properties limited to RMB46 million (equivalent
to US$6,609,000) from Zhongxinfang was frozen (collectively the “Pre-litigation Preservations”). As at June 30,
2026, the Pre-litigation Preservations were extended to May 2027.
Based on the adjudication issued in relation to the lawsuit against Zhongxinfang, Zhongxinfang shall repay the Tax
and Other Surcharge to Huatailong. As Zhongxinfang has not settled such amount within the due date, Huatailong
applied for an enforcement of the November 2020 Adjudication in January 2021 (the “2021 Enforcement”).
However, on June 24, 2021, the Tibet Intermediate Court adjudicated the 2021 Enforcement be suspended as
all of the assets owned by Zhongxinfang have been sealed up or frozen and there are no executable properties
from Zhongxinfang.
As at June 30, 2026 and up to the date these condensed consolidated financial statements are authorised for
issue, the New Premises are still not delivered to Huatailong. In the opinion of directors, (i) the 2021 Enforcement is
currently suspended and the Group’s first priority of claim over one of the assets under Pre-litigation Preservations
has been extended to May 2027, (ii) the enforcement of the adjudication that Zhongxinfang should pay penalty
of RMB9 million to Huatailong that was applied by Huatailong in March 2023 is currently under proceeding and
the result is not ascertained as at the date these condensed consolidated financial statements are authorised
for issue. Further background on these matters is disclosed in the Group’s annual financial statements for the
year ended December 31, 2025 and 2024.
21. EVENT AFTER THE REPORTING PERIOD
Other than those disclosed in notes to the condensed financial statements, the Group had no material event after the
end of the reporting period.
- 53 -
CORPORATE GOVERNANCE
The Company has complied with the code provisions under the Code on Corporate Governance Practices
(the “Code”) set out in Appendix C1 to the Rules Governing the Listing of Securities on the Stock
Exchange of Hong Kong Limited (the “Listing Rules”) during the six months ended June 30, 2026.
MODEL CODE FOR SECURITIES TRANSACTIONS
The Company has adopted policies in its Corporate Disclosure, Confidentiality and Securities Trading
Policy that has terms which are no less exacting than those set out in Appendix C3 to the Listing Rules
(the “Model Code”). The Board is pleased to confirm, after specific enquiries with all Directors, that
all Directors have fully complied with standards required according to the Model Code during the six
months ended June 30, 2026.
PURCHASE, SALE OR REDEMPTION OF THE COMPANY’S LISTED SECURITIES
For the six months ended June 30, 2025, neither the Company nor any of its subsidiaries has purchased,
sold or redeemed any of the Company’s listed securities.
AUDIT COMMITTEE
Pursuant to the requirements of the Code and the Listing Rules, the Company has established an audit
committee (the “Audit Committee”) comprising all the existing Independent Non-executive Directors,
namely Mr. Yingbin Ian He, (Chairman of the Audit Committee), Mr. Wei Shao, Mr. Bielin Shi, and
Ms. Ruixia Han.
The Audit Committee has reviewed the condensed consolidated financial statements for the three and
six months ended June 30, 2026, and is of the view that the Group’s condensed consolidated financial
statements for the three and six months ended June 30, 2026 are prepared in accordance with the
applicable accounting standard, laws and regulations, and appropriate disclosures have already been
made.
By Order of the Board
China Gold International Resources Corp. Ltd.
Mr. Chenguang Hou
Chairman and Chief Executive Officer
Hong Kong, 14 August 2026
As of the date of this announcement, the Board of Directors of the Company comprises of Mr. Chenguang
Hou, Mr. Yuanhui Fu, and Ms. Na, Tian as Executive Directors, Mr. Wanming Wang as Non-Executive
Director, and Mr. Ying Bin Ian He, Mr. Wei Shao, Mr. Bielin Shi, and Ms. Ruixia (Rane) Han as
Independent Non-executive Directors.
- 54 -
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock Code: 2099)
(Toronto Stock Code: CGG)
RESULTS ANNOUNCEMENT
FOR THE SIX MONTHS ENDED JUNE 30, 2026
FINANCIAL HIGHLIGHTS
20262025
For the six months ended June 30,
US$’000US$’000
Revenue914,216580,365
Net income (Loss)512,124202,322
Basic earnings (loss) per share (cents)127.9950.53
Net cash flows from operations555,180334,848
Property, plant and equipment1,338,1531,327,224
Property, plant and equipment capital expenditures22,77429,301
Cash and cash equivalents586,417309,195
Working capital909,894353,863
RESULTS
The board of directors (the “Board”) of China Gold International Resources Corp. Ltd. (the “Company”
together with its subsidiaries, referred hereto as the “Group”) is pleased to announce the condensed
consolidated results of the Group for the three and six months ended June 30, 2026 with comparative
figures for the comparable period in 2025, as follows:
- 1 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Management’s Discussion and Analysis of Financial Condition and Results of Operations for the three and six months ended June 30, 2026. (Stated in U.S. dollars, except as otherwise noted) FORWARD-LOOKING STATEMENTS1 THE COMPANY2 OVERVIEW2 PERFORMANCE HIGHLIGHTS2 OUTLOOK3 RESULTS OF OPERATIONS5 SELECTED QUARTERLY FINANCIAL DATA5 SELECTED QUARTERLY AND ANNUAL PRODUCTION DATA AND ANALYSIS5 REVIEW OF QUARTERLY AND ANNUAL DATA7 NON-IFRS MEASURES9 MINERAL PROPERTIES11 THE CSH MINE11 THE JIAMA MINE13 LIQUIDITY AND CAPITAL RESOURCES17 CASH FLOWS18 OPERATING CASH FLOW19 INVESTING CASH FLOW19 FINANCING CASH FLOW19 EXPENDITURES INCURRED19 GEARING RATIO19 SIGNIFICANT INVESTMENTS, ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES. ASSOCIATES AND JOINT VENTURES, AND FUTURE PLAN FOR MATERIAL INVESTMENTS OF CAPITAL ASSETS20 CHARGE ON ASSETS20 EXPOSURE TO FLUCTUATIONS IN EXCHANGE RATES AND RELATED HEDGES20 COMMITMENTS20 RELATED PARTY TRANSACTIONS21 PROPOSED TRANSACTIONS22 CRITICAL ACCOUNTING ESTIMATES22 CHANGE IN ACCOUNTING POLICIES22 FINANCIAL INSTRUMENTS AND OTHER INSTRUMENTS22 OFF-BALANCE SHEET ARRANGEMENTS22 DIVIDEND AND DIVIDEND POLICY22 OUTSTANDING SHARES23 DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING23 RISK FACTORS23 QUALIFIED PERSON23 ADDITIONAL INFORMATION23
- 2 -
MANAGEMENT’S DISCUSSION AND ANALYSIS The following Management Discussion and Analysis of financial condition and results of operations (“MD&A”) is prepared as of August 13, 2026. It should be read in conjunction with the consolidated financial statements and notes thereto of China Gold International Resources Corp. Ltd. (referred to herein as “China Gold International”, the “Company”, “we” or “our” as the context may require) for the three and six months ended June 30, 2026 and the three and six months ended June 30, 2025, respectively. Unless the context otherwise provides, references in this MD&A to China Gold International or the Company refer to China Gold International and each of its subsidiaries collectively on a consolidated basis. The following discussion contains certain forward-looking statements relating to the Company’s plans, objectives, expectations and intentions, which are based on the Company’s current expectations and are subject to risks, uncertainties and changes in circumstances. Readers should carefully consider all of the information set out in this MD&A, including the risks and uncertainties outlined further in the Company’s Annual Information Form (“Annual Information Form” or “AIF”) dated March 30, 2026 on SEDAR+ at www.sedarplus.ca, www.chinagoldintl.com and www.hkex.com.hk. For further information on risks and other factors that could affect the accuracy of forward-looking statements and the result of operations of the Company, please refer to the sections titled “Forward-Looking Statements” and “Risk Factors” and to discussions elsewhere within this MD&A. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks. FORWARD-LOOKING STATEMENTS Certain statements made herein, other than statements of historical fact relating to the Company, represent forward-looking information. In some cases, this forward-looking information can be identified by words or phrases such as “may”, “will”, “expect”, “anticipate”, “contemplates”, “aim”, “estimate”, “intend”, “plan”, “believe”, “potential”, “continue”, “is/are likely to”, “should” or the negative of these terms, or other similar expressions intended to identify forward-looking information. This forward-looking information includes, among other things; China Gold International’s production estimates, business strategies and capital expenditure plans; the development and expansion plans and schedules for the CSH Mine and the Jiama Mine; China Gold International’s financial condition; the regulatory environment as well as the general industry outlook; general economic trends in China; and statements respecting anticipated business activities, planned expenditures, corporate strategies, participation in projects and financing, and other statements that are not historical facts. By their nature, forward-looking information involves numerous assumptions, both general and specific, which may cause the actual results, performance or achievements of China Gold International and/or its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward–looking information. Some of the key assumptions include, among others, the absence of any material change in China Gold International’s operations or in foreign exchange rates, the prevailing price of gold, copper and other non-ferrous metal products; the absence of lower- than-anticipated mineral recovery or other production problems; effective income and other tax rates and other assumptions underlying China Gold International’s financial performance as stated in the Company’s technical reports for its CSH Mine and Jiama Mine; China Gold International’s ability to obtain regulatory confirmations and approvals on a timely basis; continuing positive labor relations; the absence of any material adverse effects as a result of political instability, terrorism, natural disasters, pandemics such as COVID-19, litigation or arbitration and adverse changes in government regulation; the availability and accessibility of financing to China Gold International; and the performance by counterparties of the terms and conditions of all contracts to which China Gold International and its subsidiaries are a party. The forward-looking information is also based on the assumption that none of the risk factors identified in this MD&A or in the AIF that could cause actual results to differ materially from the forward-looking information actually occurs.
- 3 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Forward-looking information contained herein as of the date of this MD&A is based on the opinions, estimates and assumptions of management. There are a number of important risks, uncertainties and other factors that could cause actual actions, events or results to differ materially from those described as forward-looking information. China Gold International disclaims any obligation to update any forward-looking information, whether as a result of new information, estimates, opinions or assumptions, future events or results, or otherwise except to the extent required by law. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking information in this MD&A is expressly qualified by this cautionary statement. The reader is cautioned not to place undue reliance on forward-looking information. THE COMPANY Overview China Gold International is a gold and base metal mining company registered in British Columbia, Canada. The Company’s main business involves the operation, acquisition, development and exploration of gold and base metal properties. The Company’s principal mining operations are the Chang Shan Hao Gold Mine (“CSH Mine” or “CSH”), located in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine (“Jiama Mine” or “Jiama”), located in Tibet, China. China Gold International holds a 96.5% interest in the CSH Mine, while its Chinese joint venture (“CJV”) partner holds the remaining 3.5% interest. The Company owns a 100% interest in the Jiama Mine, which hosts a large scale copper-gold polymetallic deposit containing copper, gold, molybdenum, silver, lead and zinc metals. China Gold International’s common shares are listed on the Toronto Stock Exchange (“TSX”) and The Stock Exchange of Hong Kong Limited (“HKSE”) under the symbol CGG and the stock code 2099, respectively. Additional information about the Company, including the Company’s Annual Information Form, is available on SEDAR+ at sedarplus.ca as well as Hong Kong Exchange News at hkexnews.hk. Performance Highlights Three months ended June 30, 2026 • Revenue increased by 50% to US$461.0 million from US$307.3 million for the same period in 2025. • Mine operating earnings of US$327.3 million, increased by US$167.9 million from mine operating earnings of US$159.4 million for the same period in 2025. • Net profit of US$275.8 million increased by US$159.5 million from US$116.3 million for the same period in 2025. • Cash flow from operation of US$286.5 million, increased from US$191.3 million for the same period in 2025. • Total gold production decreased by 14% to 37,498 ounces from 43,403 ounces for the same period in 2025. • Total copper production was 41.1 million pounds (approximately 18,641 tonnes) a slight increase from 39.7 million pounds (approximately 18,013 tonnes) for the same period in 2025.
- 4 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Six months ended June 30, 2026 • Revenue increased by 58% to US$914.2 million from US$580.4 million for the same period in 2025. • Mine operating earnings of US$620.1 million, increased by US$343.0 million from mine operating earnings of US$277.1 million for the same period in 2025. • Net profit of US$512.1 million increased by US$309.8 million from US$202.3 million for the same period in 2025. • Cash flow from operation of US$555.2 million, increased from US$334.8 million for the same period in 2025. • Total gold production decreased by 18% to 72,317 ounces from 88,200 ounces for the same period in 2025. • Total copper production was 78.6 million pounds (approximately 35,671 tonnes) a slight increase from 77.0 million pounds (approximately 34,924 tonnes) for the same period in 2025. Outlook After the repairs and reinforcements of the overflow of the Guolanggou Tailings Dam, the Government of Tibet Autonomous Region and relevant departments of the central government approved the resumption of Jiama’s operations on May 30, 2024, with a daily processing capacity of 34,000 tonnes, which is lower than the design processing capacity. The Company is actively advancing the construction of the Youlongbu tailings storage facility (Phase III tailings pond), which is expected to be completed and put into operation by the end of 2027. The total daily processing capacity is anticipated to increase to 44,000 tpd once the Youlongbu tailings storage facility is in operation. The open-pit operations at the CSH gold mine are nearing the end of its mine life. To ensure stable production continuity, the Company is actively advancing the transition from open-pit to underground mining, with relevant construction works already commenced. With the CSH pit’s increased depth, the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. On May 22, 2026, a localized slope instability event occurred at CSH Gold Mine, which was a localized geological hazard primarily attributed to heavy rainfall in the area combined with complex geological conditions. Mining activities at the open pit remain temporarily suspended pending further geotechnical and operational assessment. Processing operations continue utilizing available low-grade ore stockpiles to maintain production. The Company is currently assessing the potential impact of the event on mining operations and future production plans. Based on the information currently available, the Company does not expect the event to materially affect its annual production guidance. Inconsideration of the events, the Company reports separate production guidance for the two mines in 2026. CSH Mine: • The total gold production is estimated between 70,732 ounces (2.2 tonnes) and 83,592 ounces (2.6 tonnes). Jiama Mine: • The copper production will be approximately between 140 million pounds (63,500 tonnes) and 149 million pounds (67,500 tonnes); • The gold production will be approximately between 70,732 ounces (2.2 tonnes) and 75,554 ounces (2.35 tonnes); • The silver production will be approximately between 4.18 million ounces (130 tonnes) and 4.82 million ounces (150 tonnes).
- 5 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Outline of the Long-Term Development Plan for the Jiama Mine In 2024, the Company successfully restored stable operation at the Jiama Mine. In addition, the Company continued to focus its efforts on optimizing resource utilization plan, integrating the identified high-grade underground resources, and accelerating the exploration work at high potential zones. On June 30, 2026, the Company announced a transformational mineral resource update for the Jiama Mine, with measured mineral resource increased 523% and proven mineral reserve increased 1,170%. The long-term development plan for the Jiama Mine consists of three phases: • Prior to the completion of the construction of the new tailings storage facility (the “Youlongbu tailings storage facility”), the Jiama Mine Phase II processing plant will maintain and operate at its current processing capacity of 34,000 tons per day to match the Guolanggou’s storage capacity (the operation of Phase I processing plant has been suspended since May 2024). • The Youlongbu tailings storage facility is scheduled to commence operation by the end of 2027, allowing a further increase in the Jiama Mine’s production capacity. Over the next two years, as part of the underground resource integration plan, the Company plans to apply to increase the permitted capacity on its mining license for the Jiama Mine, subject to compliance with the relevant safety requirements. Currently, the permitted capacity on the mining license of the Jiama Mine is 14.4 million tonnes per year (approximately 44,000 tonnes per day based on 330 operating days per year). Subject to the government approval of an increased annual mining rate, and following the commissioning of Youlongbu tailings storage facility, the Jiama Mine’s ore processing volume will return to the level of 50,000 tonnes per day, in line with the designed processing capacity of the processing plants. In addition, endeavors are underway so that the production levels at the Jiama Mine will restore to those before the Guolanggou tailings overflow through blending of high-grade underground ores. • The Company is also working to substantially expand the known mineralized system and delineate additional mineral resources and reserves at depth and in surrounding areas of the Jiama Mine, including the Zegulang North. The Company completed a NI 43-101 Technical Report on June 30, 2026 with the updated Mineral Resource, which significantly expands the Jiama Mine’s scale and development potential, providing a robust foundation for future production expansion, mine life extension and further technical studies on larger-scale mining scenarios. Subject to the final exploration outcomes and feasibility studies on resource development, the Company will formulate a comprehensive expansion plan for the Jiama Mine area. This study has already been initiated at a preliminary stage. The Company will provide an update on the progress and results in due course.
- 6 -
MANAGEMENT’S DISCUSSION AND ANALYSIS RESULTS OF OPERATIONS Selected Quarterly Financial Data Quarter ended 202620252024
(US$ in thousands except per share)30-Jun31-Mar31-Dec30-Sep30-Jun31-Mar31-Dec30-Sep
Revenue461,013453,203384,734345,026307,269273,096293,567254,581 Cost of sales133,675160,433174,826147,993147,872155,444171,413207,762 Mine operating earnings327,338292,770209,908197,033159,397117,653122,15446,819 General and administrative expenses16,82415,10021,45014,18412,06812,23217,8779,944 Exploration and evaluation expenditures6117126822413350824749 Research and development expenses6,4635,45916,3997,8485,2563,2968,1184,704 Income from operations303,990272,040171,791174,777141,940101,61795,91232,122 Foreign exchange gain (loss)4,796(2,464)7,381(3,039)(2,037)(2,654)(4,631)2,670 Finance costs3,3654,0654,5114,7114,5805,0025,3135,692 Profit before income tax312,823267,214171,694153,450139,25295,77085,54030,166 Income tax expense (credit)37,07030,84343,99411,15622,9099,79117,2232,293 Net profit (loss)275,753236,371127,699142,294116,34385,97968,31727,873 Basic & diluted earnings (loss) per share (cents)68.9759.0231.6735.6029.0821.4516.976.84
Selected Quarterly and Annual Production Data and Analysis CSH MineThree months ended June 30,Six months ended June 30
2026202520262025
Gold sales (US$ million)97.7584.58224.45163.67 Realized average price (US$) of gold per ounce4,5463,3194,7033,094 Gold produced (ounces)21,50022,09042,85345,829 Gold sold (ounces)21,50025,48347,72452,893 Total production cost (US$ per ounce)1,7721,6121,7761,619 Cash production cost (1) (US$ per ounce)1,2821,2511,2911,153
(1) Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A
- 7 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Gold production at the CSH Mine decreased by 3% to 21,500 ounces for the three months ended June 30, 2026 compared to 22,090 ounces for the same period in 2025. The total production cost of gold for the three months ended June 30, 2026 increased to US$1,772 per ounce compared to US$1,612 for the same period in 2025. The cash production cost of gold for the three months ended June 30, 2026 increased to US$1,282 per ounce from US$1,251 for the same period in 2025. Jiama MineThree months ended June 30,Six months ended June 30,
2026202520262025
Copper sales (US$ in millions)189.18110.72359.84204.22 Realized average price 1 (US$) of copper per pound after smelting fee discount 6 4.742.864.662.70 Copper produced (tonnes)18,64118,01335,67134,924 Copper produced (pounds)41,096,64739,710,00278,640,91976,993,263 Copper sold (tonnes)17,98617,56535,03534,292 Copper sold (pounds)39,652,94638,722,49277,238,99875,599,786 Gold produced (ounces)15,99821,31329,46442,371 Gold sold (ounces)15,74120,88129,28741,619 Silver produced (ounces)1,542,4001,436,2602,776,9492,750,668 Silver sold (ounces)1,480,0331,392,3892,721,1382,685,804 Lead produced (tonnes)13,22610,26223,97021,038 Lead produced (pounds)29,158,47122,624,76452,845,99446,381,857 Lead sold (tonnes)12,4219,71823,28320,201 Lead sold (pounds)27,383,75721,423,65151,329,53744,536,444 Zinc produced (tonnes)7,7575,47712,12410,893 Zinc produced (pounds)17,102,25512,075,71926,728,18524,015,893 Zinc sold (tonnes)7,3005,10711,70310,470 Zinc sold (pounds)16,093,28111,258,96325,801,00523,081,507 Moly produced (tonnes)103255207452 Moly produced (pounds)226,331559,570456,142997,022 Moly sold (tonnes)85234197494 Moly sold (pounds)187,481516,452434,0851,087,991 Total production cost 2 (US$) of copper per pound2.963.193.253.29 Total production cost 2 (US$) of copper per pound after by-products credits 4 (1.38)0.33(0.98)0.53 Cash production cost 4 (US$) per pound of copper2.192.352.482.48 Cash production cost 3 (US$) of copper per pound after by-products credits 4 (2.16)(0.49)(1.75)(0.28)
1 A discount factor of 11.9% to 25.3% is applied to the copper benchmark price to compensate the refinery costs incurred by the buyers. The discount factor is higher if the grade of copper in copper concentrate is below 18%. The industry standard of copper in copper concentrate is between 18-20%. 2 Production costs include expenditures incurred at the mine sites for the activities related to production including mining, processing, mine site G&A and royalties etc. 3 Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A. 4 By-products credit refers to the sales of gold, silver, lead, zinc and moly during the corresponding period. 5 Increased production of by-products combined with reduced G&A and R&D costs, has resulted in by-product credits exceeding total production cost of copper. 6 Due to the relatively high discount factor applied to mixed ore, the overall copper sales price decreased compared with the prior year.
- 8 -
MANAGEMENT’S DISCUSSION AND ANALYSIS During the three months ended June 30, 2026, The Jiama Mine produced 18,641 tonnes (approximately 41.1 million pounds) of copper, which increased from of 18,013 tonnes (approximately 39.7 million pounds) during the comparative three month period in 2025. Total production cost of copper per pound decreased by 7% in the second quarter of 2026 as compared to the same period in 2025. Cash production cost of copper per pound decreased by 7% as compared to the same quarter in 2025. Total production cost of copper per pound after by-products and cash production cost of copper per pound after by-product also decreased in 2026 as compared to the same three month period in 2025, mainly due to higher by-product revenue from gold and silver. Review of Quarterly and Annual Data Three months ended June 30, 2026 compared to three months ended June 30, 2025 Revenue of US$461.0 million for the second quarter of 2026, increased by US$153.7 million from US$307.3 million for the same period in 2025. Revenue from the CSH Mine was US$97.8 million, an increase of US$13.2 million from US$84.6 million for the same period in 2025. The realized average gold price increased by 37%, from US$3,319/oz in Q2 2025 to US$4,546/oz in Q2 2026. Gold sold by the CSH Mine was 21,500 ounces (gold produced: 21,500 ounces), compared to 25,483 ounces (gold produced: 22,090 ounces) for the same period in 2025. Revenue from the Jiama Mine was US$363.3 million, an increase of US$140.6 million, compared to US$222.7 million for the same period in 2025. The realized average price of copper increased by 66%, from US$2.86/pound in Q2 2025 to US$4.74/pound in Q2 2026. Total copper sold was 17,986 tonnes (39.7 million pounds) for the three months ended June 30, 2026, an increase of 2% from 17,564 tonnes (38.7 million pounds) for the same period in 2025. Cost of sales of US$133.7 million for the quarter ended June 30, 2026, a decrease of US$14.2 million from US$147.9 million for the same period in 2025. Cost of sales as a percentage of revenue for the Company decreased from 48% to 29% for the three months ended June 30, 2025 and 2026, respectively. Cost of sales was impacted by many operation factors such as grade of ore, recovery rates and stripping ratio. Refer to the sections below for details of production factors for each individual mine. Mine operating earnings of US$327.3 million for the three months ended June 30, 2026, an increase of US$167.9 million from US$159.4 million for the same period in 2025. General and administrative expenses increased by US$4.7 million, from US$12.1 million for the quarter ended June 30, 2025 to US$16.8 million for the quarter ended June 30, 2026, partially due to higher taxes and surcharges resulting from increased revenue in the current quarter. Research and development expenses of US$6.5 million for the three months ended June 30, 2026, increased from US$5.3 million for the comparative period in 2025. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes. Income from operations of US$304.0 million for the second quarter of 2026, increased by US$162.1 million, compared to US$141.9 million for the same period in 2025. Foreign exchange gain of US$4.8 million for the three months ended June 30, 2026, increased from a loss of US$2.0 million for the same period in 2025. The gain was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB.
- 9 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Interest and other income of US$7.4 million for the three months ended June 30, 2026, increased from US$4.9 million for the same period in 2025, primarily due to higher interest income earned during the current quarter compared to the corresponding period last year. In addition, the Company recognized dividend income of US$2.9 million from China Nonferrous Mining Corporation Limited during the current quarter. Finance costs of US$3.4 million for the three months ended June 30, 2026, decreased by US$1.2 million compared to US$4.6 million for the same period in 2025. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Income tax expense of US$37.1 million for the three months ended June 30, 2026, increased by US$14.2 million from US$22.9 million for the comparative period in 2025. During the current quarter, the Company recorded deferred tax credit of US$8.2 million, compared to an expense of US$7.1 million for the same period in 2025. Net income of US$275.8 million for the three months ended June 30, 2026, increased by US$159.5 million from US$116.3 million for the three months ended June 30, 2025. Six months ended June 30, 2026 compared to six months ended June 30, 2025 Revenue of US$914.2 million for the first half of 2026, increased by US$333.8 million from US$580.4 million for the same period in 2025. Revenue from the CSH Mine was US$224.5 million, an increase of US$60.8 million from US$163.7 million for the same period in 2025. The realized average gold price increased by 52%, from US$3,094/oz in the first six months of 2025 to US$4,703/oz in the same period of 2026. Gold sold by the CSH Mine was 47,724 ounces (gold produced: 42,853 ounces), compared to 52,893 ounces (gold produced: 45,829 ounces) for the same period in 2025. Revenue from the Jiama Mine was US$689.8 million, an increase of US$273.1 million, compared to US$416.7 million for the same period in 2025. The realized average price of copper increased by 73%, from US$2.70/pound in the first six months of 2025 to US$4.66/pound in the same period of 2026. Total copper sold was 35,035 tonnes (77.2 million pounds) for the six months ended June 30, 2026, an increase of 2% from 34,292 tonnes (75.6 million pounds) for the same period in 2025. Cost of sales of US$294.1 million for the six months ended June 30, 2026, a decrease of US$9.2 million from US$303.3 million for the same period in 2025. Cost of sales as a percentage of revenue for the Company decreased from 52% to 32% for the six months ended June 30, 2025 and 2026, respectively. Cost of sales was impacted by many operation factors such as grade of ore, recovery rates and stripping ratio. Refer to the sections below for details of production factors for each individual mine. Mine operating earnings of US$620.1 million for the six months ended June 30, 2026, an increase of US$343.0 million from US$277.1 million for the same period in 2025. General and administrative expenses increased by US$7.6 million, from US$24.3 million for the six months ended June 30, 2025 to US$31.9 million for the six months ended June 30, 2026, partially due to higher taxes and surcharges resulting from increased revenue in the current period. Research and development expenses of US$11.9 million for the six months ended June 30, 2026, increased from US$8.6 million for the comparative period in 2025. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes. Income from operations of US$576.0 million for the six months ended June 30, 2026, increased by US$332.4 million, compared to US$243.6 million for the same period in 2025.
- 10 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Foreign exchange gain of US$2.3 million for the six months ended June 30, 2026, increased from a loss of US$4.7 million for the same period in 2025. The gain was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB. Interest and other income of US$9.1 million for the six months ended June 30, 2026, increased from US$6.7 million for the same period in 2025, primarily due to higher interest income earned during the current period compared to the corresponding period last year. In addition, the Company recognized dividend income of US$2.9 million from China Nonferrous Mining Corporation Limited during the current period. Finance costs of US$7.4 million for the six months ended June 30, 2026, decreased by US$2.2 million compared to US$9.6 million for the same period in 2025. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Income tax expense of US$67.9 million for the six months ended June 30, 2026, increased by US$35.2 million from US$32.7 million for the comparative period in 2025. During the current period, the Company recorded deferred tax credit of US$10.7 million, compared to a deferred tax expense of US$4.5 million for the same period in 2025. Net income of US$512.1 million for the six months ended June 30, 2026, increased by US$309.8 million from US$202.3 million for the six months ended June 30, 2025. NON-IFRS MEASURES The cash cost of production, cash cost after by-product credits and cash cost per ounce and per pound are measures that are not in accordance with IFRS. The Company has included these metrics to supplement its consolidated financial statements, which are presented in accordance with IFRS. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance, operating results or financial condition prepared in accordance with IFRS. The Company has included cash production cost per ounce and per pound data because it understands that certain investors use this information to determine the Company’s ability to generate earnings and cash flow. The measures are not necessarily indicative of operating results, cash flow from operations, or financial condition as determined under IFRS. The following tables provide a reconciliation of cost of sales to the cash costs of production in total dollars and in dollars per gold ounce for the CSH Mine or per copper pound for the Jiama Mine:
- 11 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Cash production cost for gold is calculated as total cost of sales adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of gold per ounce is calculated as total cash production cost divided by total gold sold (ounces). CSH Mine (Gold)Three months ended June 30,Six months ended June 30,
2026202520262025 US$ US$ Per ounceUS$ US$ Per ounceUS$ US$ Per ounceUS$ US$ Per ounce
Total Cost of sales 1 38,092,0891,77241,083,5901,61284,755,5341,77685,622,3911,619 Adjustment – Depreciation & depletion(10,224,780)(476)(9,042,823)(355)(22,721,182)(476)(24,217,957)(458)
Adjustment – Amortization of intangible assets(302,605)(14)(158,213)(6)(421,367)(9)(415,399)(8)
Total cash production costs27,564,7041,28231,882,5541,25161,612,9851,29160,989,0351,153
Total Gold sold ounces21,50025,48347,72452,893
Cash production cost of gold US$ per ounce calculated as total cash production cost divided by total gold sold ounces.
Cash Production cost for copper is calculated as production costs (total cost of sales adjusted by General and administrative expenses and Research and development expenses) adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of copper (pounds) is calculated as total cash production cost divided by total copper sold (pounds). Jiama Mine (Copper with by-products credits)Three months ended June 30,Six months ended June 30,
2026202520262025 US$ US$ Per PoundUS$ US$ Per PoundUS$ US$ Per PoundUS$ US$ Per Pound
Total Cost of sales95,582,0502.41106,787,3632.76209,352,0542.71217,692,3072.88
General and administrative expenses15,604,4380.3911,037,3840.2929,737,3650.3922,317,8290.30 Research and development expenses6,462,4650.165,256,8770.1411,921,7530.158,552,4760.11
Total production cost117,648,9532.96123,081,6243.19251,011,1723.25248,562,6123.29
Adjustment – Depreciation & depletion(24,050,180)(0.61)(25,244,711)(0.65)(47,207,459)(0.61)(47,845,864)(0.63) Adjustment – Amortization of intangible assets(6,319,242)(0.16)(7,184,749)(0.19)(12,266,193)(0.16)(13,933,658)(0.18)
Total cash production costs87,279,5312.1990,652,1642.35191,537,5202.48186,783,0902.48
By-products credits(172,408,019)(4.35)(110,149,983)(2.84)(326,616,518)(4.23)(208,730,753)(2.76)
Total cash production costs after by-products credits(85,128,488)(2.16)(19,497,820)(0.49)(135,078,998)(1.75)(21,947,663)(0.28)
Total Copper sold pounds39,652,94638,722,49277,238,99875,599,786
Cash production cost of copper US$ per pound calculated as total cash production cost divided by total copper sold pounds.
- 12 -
MANAGEMENT’S DISCUSSION AND ANALYSIS MINERAL PROPERTIES The CSH Mine The CSH Mine is located in Inner Mongolia Autonomous Region of China (Inner Mongolia). The property hosts two low- grade, near surface gold deposits, along with other mineralized prospects. The main deposit is called the Northeast Zone (the “Northeast Zone”), while the second, smaller deposit is called the Southwest Zone (the “Southwest Zone”). The CSH Mine is owned and operated by Inner Mongolia Pacific Mining Co. Limited, a Chinese Joint Venture in which the Company holds a 96.5% interest and Ningxia Nuclear Industry Geological Exploration Institution holds the remaining 3.5%. The CSH Mine is an open-pit mining operations with a designed mining and processing capacity of 60,000 tpd. In July 2019, CSH updated its mine plan based on a result of latest ultimate limit optimization, in which the production rate was reduced to 40,000 tpd with a life of mine (“LoM”) of seven years as of 2019. The run-of-mine ore is heap leached with cyanide solution to extract gold and electro-winned to produce a gold dore which is sold to refiners. In June 2020, the operation of southwest pit ended. The open-pit operations at the CSH gold mine are nearing the end of its mine life. With the increase in the pit’s depth, the height and exposed area of the pit wall have increased, and the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. Ensuring slope stability and avoiding systematic risks at this stage is the Company’s top priority to ensure safe and sustainable production. The Company continues to evaluate the potential for underground operations. The major new contracts entered into during the six months ended June 30, 2026: Item No.Contract NameCounterpart Subject amount (US $ millions) Contract period (effective day and expiration date)Date of Contract
1Construction Contract for the Ventilation and Drainage Systems of the Haoyao’erhudong Gold Mine Annual 8.25 Million Metric Tonne Gold Ore Mining Project (Conversion from Open-Cast to Underground Mining) China Gold Group Construction Corporation Limited 18.542026.4.26-2029.12.312026.3.3 2Inner Mongolia Pacific.Mining and stripping procedure of open-pit for the 2026-2028 period China Gold Group Construction Corporation Limited 55.572026.1.1-2028.12.312026.3.6
Production Update CSH MineThree months ended June 30,Six months ended June 30,
2026202520262025
Ore mined and placed on pad (tonnes)2,056,7053,388,4653,790,7436,097,924 Average ore grade (g/t)0.520.480.530.50 Recoverable gold (ounces)20,38630,88238,09058,817 Ending gold in process (ounces)133,259155,295133,259155,295 Waste rock mined (tonnes)339,6981,608,2331,311,8463,911,422
For the three months ended June 30, 2026, the total amount of ore placed on the leach pad was 2.1 million tonnes, with total contained gold of 20,386 ounces (634.1 kilograms). The overall accumulative project-to-date gold recovery rate remained consistent at approximately 56.74% at the end of June 30, 2026 from 56.70% at the end of March 31, 2026. Of which, gold recovery from the phase I and phase II heap leach pads were 59.77% and 55.09% at June 30, 2026, respectively.
- 13 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Exploration There was no drilling or exploration program for the six months ended June 30, 2026 for the CSH Mine. Mineral Resource Update CSH Mine Mineral Resources by category, at December 31, 2025 under NI 43-101 are listed below: Metal
Location
Mineral
Resource
Category
Tonnage
(x1000 t)Au (g/t)Au (t)Au (Moz)
Remaining within the open pit
limit at a cut-off grade of
0.28 g/t Au
Measured6,0310.684.090.132
Indicated6,6470.724.750.153
M+I12,6780.708.840.285
Inferred2,5760.410.150.005
Underground at a cut-off grade
of 0.30 g/t Au
Measured88,2000.6758.661.89
Indicated89,8500.5852.071.67
M+I178,0500.62110.723.56
Inferred62,0900.4930.680.99
Note: Mineral Resources are reported in relation to a conceptual open-pit mining and underground block caving mining. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate. Raw assays have been capped. Mineral Resources include Mineral Reserves. Mineral Resources are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. Additional Mineral Resources are reported at a cut-off grade of 0.30 g/t Au for underground block caving mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce is equal to 31.1035 grams. The mineral resource estimates include Au only. CGME Consulting limited (CGME) has estimated the mineral resources of the CSH gold deposit based on a cut-off grade of 0.28 g/t Au within the optimized ultimate open-pit limit and a cut-off grade of 0.30 g/t Au below the open pit limit on April 1, 2022. The resource estimate was conducted using Ordinary Kriging, validated by Inversed Distance Squared method, and Micromine modelling software. CGME considers that blocks estimated for the first estimation pass with an average anisotropic distance to samples of less than 45 m can be classified as Measured Mineral Resources, and blocks estimated for the second estimation pass with an average anisotropic distance to samples of less than 80 m can be classified as Indicated Mineral Resources, and blocks estimated for the third estimation pass with an average anisotropic distance to samples of not more than 150 m can be categorised as Inferred Mineral Resources. For those Measured and Indicated Mineral Resource blocks, CGME considers that the degree of confidence is sufficient to allow an appropriate application of technical and economic parameters to support mine planning and to allow evaluation of the economic viability of the deposit, which is also adequate to support the open pit mining operations. In CGME’s opinion, the upper portions of gold mineralization at the CSH Gold Project are amenable to extraction by open pit mining with a cut-off grade optimised of 0.28 g/t Au, and the block caving mining operation would be the choice for extraction below the optimized open pit limits with a cut-off grade of 0.30 g/t Au in this estimation based on a Reasonable Prospect for Eventual Economic Extraction (“RPEEE”). It is noted that the partial mineral resources outside of the open pit limit but above the bottom plane may not be amenable to extraction in the future. Meanwhile, the mineral resources located below 840 m ASL at NE zone and 1,250 m ASL at SW zone may not be amendable to extraction in the future due to either excessive depth or high dilution. These mineral resources that may not be amendable to extraction in the future are excluded from the Mineral Resource Statement in this Report. Block model quantity and grade estimates for the CSH gold deposit were classified according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Yuan Chen, MSc., MAIG (M4014)/RPGeo (10262) (April 2022), an independent Qualified Person for the purposes of National Instrument 43-101 and updated by Mr. Yingting Guo, MMSA., PGeo., an independent Qualified Person for the purposes of National Instrument 43-101 on December 31, 2025.
- 14 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Mineral Reserves Update CSH Mine Mineral Reserves by category at December 31, 2025 under NI 43-101 are summarized below: Metal
Type T (x 1,000)Diluted Au g/tAu tAu Moz
Proven6,4050.644.110.13 Probable7,2220.674.870.16
Total13,6270.668.980.29
Note: Mineral Reserves are reported based on the optimized ultimate open pit limit. All figures are rounded to reflect the relative accuracy of the estimate. Mineral Reserves are included in Mineral Resources. Mineral Reserves are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,568 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce is equal to 31.1035 grams. The Proven Mineral Reserves are 6.41 Mt at a grade of 0.64 g/t Au for the gold content of 4.11 t or 0.13 Moz, and the Probable Mineral Reserves are 7.22 Mt at a grade of 0.67 g/t Au for the gold content of 4.87t or 0.16 Moz, totaling Mineral Reserves of 13.63 Mt at a grade of 0.66 g/t Au for the gold content of 8.98 t or 0.29 Moz. The Mineral Reserves for the CSH gold deposit were estimated according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Guangpian Zhang, AusIMM, a full time Principal Mining Engineer for CGME and a Qualified Person for the purposes of National Instrument 43-101. The Jiama Mine Jiama is a large copper-gold polymetallic deposit containing copper, gold, silver, molybdenum, lead and zinc, located in the Gandise metallogenic belt in Tibet Autonomous Region of China. The Jiama Mine has both underground mining and open-pit mining operations. Phase I of the Jiama Mine commenced operation in the latter half of 2010 and reached its design capacity of 6,000 tpd in early 2011. Phase II of the Jiama Mine commenced mining operations in 2018 with 44,000 tpd design capacity. The combined mining and processing design capacity at the Jiama Mine is 50,000 tpd.
- 15 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
The major new contracts entered into during the six months ended June 30, 2026:
Item No.Contract NameCounterpart
Subject amount
(US $ millions)
Contract period
(effective day and
expiration date)
Date of
Contract
1Contract for the 110kV Transmission and
Transformation Project of Youlongbu Tailings
Reservoir by Tibet Huatailong Mining
Development Co., Ltd.
China Energy Construction
Group Guangxi Hydropower
Engineering Bureau Co., Ltd.
5.68 2026.02.04 –
To be completed
within 90 days of
contract date
2026.02.04
2Xizang Huatailong Mining Development Co.,
Ltd. Underground Drilling Project Contract for
Jamang Mine Area, 2026-2028
Yunnan Geological Survey
Institute of Sinochem
Geological & Mining Bureau
3.90 2026.04.07 –
2029.04.06
2026.04.07
Production Update Jiama MineThree months ended June 30,Six months ended June 30,
2026202520262025
Ore processed (tonnes)2,815,5562,982,2855,553,7345,837,608 Average copper ore grade (%)0.770.710.750.71 Copper recovery rate (%)87858684 Average gold grade (g/t) 0.220.300.210.31 Gold recovery rate (%)80737868 Average silver grade (g/t)22.5721.0221.2121.17 Silver recovery rate (%)76717369 Average Lead grade (%)1.111.081.051.04 Lead recovery rate (%)83.1577.8581.5077.06 Average Zinc grade (%)0.700.630.580.58 Zinc recovery rate (%)75.6471.7575.0372.2 Average Moly grade (%)0.020.040.020.04 Moly recovery rate (%)34333433
Exploration In 2026, Tibet Huatailong Mining Development Co., Ltd. plans to continue geological exploration projects in the peripheral of the Jiama mining area and the Bayi Ranch, with a planned 50,840 meters of surface drilling across 55 holes (including 6,000 meters of contingent drilling), 1:5,000 hydrogeological, engineering, and environmental geological mapping covering 40.77 square kilometers and 1:2,000 mapping covering 2.96 square kilometers in the outer area of the Jiama Mining area, and 1:2,000 geological mapping covering 4 square kilometers, 1:2,000 geological cross-section surveys spanning 4 kilometers, and 1:2,000 rock geochemical surveys covering 4 square kilometers at the Bayi Ranch. The estimated total budget is approximately US$17.2 million (RMB119.08 million). By the end of the second quarter of 2026, 5,081.6 meters of drilling with 9 holes has been completed for the carry-over drilling project in the peripheral area of Jiama mine. For the preparation of the new 2026 exploration project, the tendering works for all sub-projects have been completed. Nine rigs are currently being mobilized and ready for commencement. Of the ten prerequisite items related to land use procedures, seven have been completed, and the remaining three are in progress.
- 16 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Mineral Resources Estimate In June 30, 2026, Changchun Gold Design Institute (“CGDI) was engaged to prepare the updated mineral resources and reserve estimate on the Jiama mine by combining mineralized units together with lithology, a full three-dimensional (3D) solid and block models were constructed in the mineral resource estimation for the Jiama mine. The mineralization wireframes are defined using a cutoff grade of 0.3%. In Leapfrog, radial basis function interpolation (RBF interpolation) is used to create mineralized bodies (domains) based on copper grades in the combined samples and distinct molybdenum, gold, silver, lead, and zinc (where applicable). Block models of copper, molybdenum, and other metals, as well as specific gravity (SG), were modeled using the conventional Kriging method (OK) and local variable directivity (dynamic anisotropy). Mineral resource estimates are based on the Canada CIM Mineral Resources and Reserves Definition Standard, officially adopted on May 10, 2014, and then subsequent MRMR Best Practice Guide updated in 2019, as well as Canada NI43-101 “Mineral Project Standards and Disclosures,” (2012). Mineral resource estimates for Jiama project as of June 30, 2026 are summarized in table below: Results of Mineral Resource Estimates for Jiama Mine at cutoff grade 0.3% Cu as of June 30, 2026* CategoryMassCuMo AgAuPbZnCuMo AgAuPbZn Mt%%g/tg/t%%MtMtMozMozktkt
Measured623.10.710.0313.160.290.080.044.380.21263.595.77478.80268.39 Indicated711.90.680.0312.100.290.060.034.770.23277.036.67426.45230.17 M & I1,3350.690.0312.600.290.070.049.150.44540.6212.45905.25498.55 Inferred454.70.650.0312.530.280.120.052.990.13183.224.04525.79205.66
*: 1) Mineral Reserves and Mineral Resources have been estimated as of 30 June 2026 in accordance with NI 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101) as required by Canadian securities regulatory authorities. 2) 0.3% copper cut-off grade has been used to report the Mineral Resource Estimation (MRE). 3) Reported Mineral Resources contain no allowances for hanging wall or footwall contact boundary loss and dilution. No mining recovery has been applied. 4) The Mineral Resources was depleted to account for UG mining tunnel and mined-out, and current open-pit excluded. 5) Mineral Resources are reported inclusive of Mineral Reserves. 6) All Mineral Resource Estimates including Cu, Mo, Au, Ag, Pb, and Zn grade and their tonnages have been rounded to reflect the imprecise nature of the estimates for each classification category, therefore totals may not appear to sum correctly due to rounding. 7) Tony (Yingting) Guo, PhD, PGeo and Chaoxian (Ian) Zhou, MSc estimated the Mineral Resources. This Mineral Resource Estimation (MRE) was estimated with an effective date of 30 June 2026 and depleted to account for annual production up until 31 December 2025. 8) Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. 9) M, Measured, I, Indicated.
- 17 -
MANAGEMENT’S DISCUSSION AND ANALYSIS As of June 30, 2026, the total measured resources at the Jiama Mine mining area include 4.38 million tons of copper metal, with a grade of 0.71%; Molybdenum metal content was 0.21 million tons, grade 0.03%; Lead metal content was 0.48 million tons, grade 0.08%; Zinc metal content was 0.27 million tons, grade 0.04%; Associated gold metal content is 5.77 million ounces, grading 0.29g/t; Associated silver metallic content is 264 million ounces, with a grade of 13.16 g/t. Indicated resource of 4.77 million tons of copper metal, grade 0.68%; Molybdenum metal content was 0.23 million tons, grade 0.03%; Lead metal content was 0.43 million tons, grade 0.06%; Zinc metal content is 0.23 million tons, grade 0.03%; Gold metal content is 6.67 million ounces, with a grade of 0.29 g/t; Silver metallic content is 277 million ounces, with a grade of 12.10g/t. The inferred resource contains 2.99 million tons of copper metal, with the copper grade of 0.65%; Molybdenum metal content was 0.13 million tons, grade 0.03%; Lead metal content was 0.53 million tons, grade 0.12%; Zinc metal content was 0.21 million tons, grade 0.05%; Gold metal content is 4.04 million ounces, with a grade of 0.28 g/t; Silver metal content is 183 million ounces, with a grade of 12.53 g/t. Mineral Reserves Estimate Updated mineral reserve estimates are based on the 2019 definition standards set by the Canadian Institute of Mines, Metallurgy and Petroleum (CIM). The mineral reserves of the Jiama Mine project were completed by CGDI. Reserve estimates are based on data and information up to December 31, 2025. Open-pit copper grade 0.3% and underground copper grade 0.5% as the cutoff grades were used for the mineral reserve estimate. The reserve estimate results are summarized in Table below: As of the June 30, 2026, the total proven mineral reserves under at Jiama Mine are 310.9 million tons of ore, containing 2.8 million tons of copper at a grade of 0.90%, 0.11 million tons of molybdenum at a grade of 0.035%, 3.98 million ounces of gold at a grade of 0.4 g/t, 179.3 million ounces of silver at a grade of 17.94 g/t, 0.26 million tons of lead at grade of 0.08% and 0.13 million tons of zinc at a grade of 0.04%. The total probable mineral reserves under at Jiama Mine are 340.3 million tons of ore, containing 2.93 million tons of copper at a grade of 0.86%, 0.116 million tons of molybdenum at a grade of 0.034%, 4.47 million ounces of gold at a grade of 0.41 g/t, 186.2 million ounces of silver at a grade of 13.23 g/t, 0.20 million tons of lead at grade of 0.06% and 0.09 million tons of zinc at a grade of 0.03%. Mineral Reserves at Jiama Project as of June 30, 2026* Average GradeMetal Contained CategoryOreCuMoAuPbZnAgCuEqCuMo AuAgPbZn Mt%%g/t%%g/t%MtMt Moz Moz KtKt
Proven310.90.900.0350.40.080.0417.941.482.80.113.98179.30.260.13 Probable340.30.860.0340.410.060.0313.231.402.930.1164.47186.20.200.09 Total651.20.880.0340.40.070.0415.101.435.730.228.45369.90.450.24
*: 1) All mineral reserves are determined according to the CIM standard specified in Canadian National Standard 43-101 2) Mineral reserves are estimated based on the following mining and economic factors: open-pit mining: a) mining methods use a 2% dilution factor and a 98% mining recovery rate; b) The overall open pit slope is 43 degrees; c) Copper price at $4.66 per pound;
- 18 -
MANAGEMENT’S DISCUSSION AND ANALYSIS d) Overall copper processing and recovery rate is 85%; e) Cutoff grade at 0.3% Cu. Underground mining: a) Mining dilution by 12%; b) Mining losses by 15%; c) Beneficiation yield of 85%; d) Cutoff grade at 0.5% Cu. 3) Mineral reserves: Open-pit copper equivalent grade 0.61% CuEq, underground copper equivalent grade l.61% CuEq; CuEq = Cu+0.01Ag+1.69Mo+0.79Au +0.23Pb+0.26*Zn; Cu, 4.66 USD/lbs, Mo, 20 USD/lbs, Ag,40USD/oz Au, 2890 USD/oz, Pb, 1.1 USD/lbs, Zn, 1.4 USD/lbs; 4) The mineral reserve estimate was prepared by Dr. Siwei He, an external consultant at Changchun Gold Design Institute Co., Ltd. He is a qualified QP under the Canadian NI43-101 standard. LIQUIDITY AND CAPITAL RESOURCES The Company operates in a capital intensive industry. The Company’s liquidity requirements arise principally from the need for financing its mining and mineral processing operations, exploration activities and acquisition of exploration and mining rights. The Company’s principal sources of funds have been proceeds from borrowings from commercial banks, corporate bonds financing, equity financings, and cash generated from operations. The Company’s liquidity primarily depends on its ability to generate cash flow from its operations and to obtain external financing to meet its debt obligations as they become due, as well as the Company’s future operating and capital expenditure requirements. At June 30, 2026, the Company had an accumulated surplus of US$1.1 billion, working capital of US$909.9 million and borrowings of US$463.3 million. The Company’s cash balance at June 30, 2026 was US$1.03 billion, among which cash and cash equivalents was US$586.4 million, Restricted cash was US$43.5 million, term deposits was US$403.8 million. Management believes that its forecast operating cash flows are sufficient to cover the next twelve months of the Company’s operations including its planned capital expenditures and current debt repayments. The Company’s borrowings are comprised of US$169.1 million of short term debt facilities with interest rates ranging from 1.25% to 4.16% per annum arranged through various banks. In addition, on November 3, 2015, the Company entered into a Loan Facility agreement with a syndicate of banks, led by Bank of China. The lenders agreed to lend an aggregate principal amount of RMB3.98 billion, approximately US$613 million with the initial interest rate of 2.83% per annum. The proceeds from the Loan Facility are to be used for the development of the Jiama Mine. The loan is secured by the mining rights for the Jiama Mine. As of June 30, 2026 the Company has fully drawn under this Facility. The outstanding loan balance is RMB1.27 billion (approximately US$186 million), bearing an annual interest rate of 1.5% maturing on November 5, 2029. On April 29, 2020, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB1.4 billion (approximately US$197.8 million). As of June 30, 2026, the Company has fully drawn down under this facility. The outstanding loan balance is RMB809 million (approximately US$119 million), bearing an annual interest rate of 1.6%, with maturity on April 28, 2034.
- 19 -
MANAGEMENT’S DISCUSSION AND ANALYSIS On August 8, 2025, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB2.1 billion (approximately US$294 million).As of June 30, 2026, the Company has drawn down RMB50 million (approximately US$7.2 million) under this facility, bearing an annual interest rate of 1.5%, with maturity on June 21, 2030. On November 9, 2023, the Company obtained a bilateral loan with an aggregate principal amount of RMB100 million (approximately US$14.1 million) from China Construction Bank at an annual interest rate of 1.25%. As of June 30, 2026, the outstanding loan balance was RMB88 million (approximately US$12.9 million). On May 13, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million (approximately US$28.2 million) from Lhasa Chengguan District Sub branch of Agricultural Bank of China Co., Ltd. at an annual interest rate of 1.35% for a term of 3 years. As of June 30, 2026, the outstanding loan balance was RMB60 million (approximately US$8.8 million). On August 20, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million (approximately US$28.04 million) from China Gold Finance Co., Ltd. at an annual interest rate of 2.45% for a term of 3 years. As of June 30, 2026, the outstanding loan balance was RMB180 million (approximately US$26.0 million). On May 12, 2026, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$64 million from China Construction Bank (Asia) Corporation Limited, bearing interest at a floating rate based on Term SOFR. On June 9, 2026, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$10 million from China Everbright Bank Co., Ltd., Hong Kong Branch, bearing interest at a floating rate based on Term SOFR. The Company believes that the availability of debt financing in China at favorable rates will continue for the foreseeable future. The Company continues to review and assess its assets for impairment as part of its financial reporting processes. To date, the assessment carried out by the Company support the carrying values of the Company’s assets and no impairment has been required. However, the management of the Company continues to evaluate key assumptions on estimates and management judgements in order to determine the recoverable amount of the CSH Mine and the Jiama Mine. CASH FLOWS The following table sets out selected cash flow data from the Company’s consolidated cash flow statements for the three and six months ended June 30, 2026 and June 30, 2025. Three months ended June 30,Six months ended June 30,
2026202520262025 US$’000US$’000US$’000US$’000
Net cash from operating activities286,477191,318555,180334,848 Net cash used in investing activities(45,978)(45,687)(110,842)(132,380) Net cash (used in) financing activities(265,433)(77,837)(271,388)(78,172) Net (decrease) increase in cash and cash equivalents(24,934)67,794172,950124,296 Effect of foreign exchange rate changes on cash and cash equivalents7,91390914,0651,120 Cash and cash equivalents, beginning of period603,438240,492399,402183,779
Cash and cash equivalents, end of period586,417309,195586,417309,195
- 20 -
MANAGEMENT’S DISCUSSION AND ANALYSIS Operating cash flow For the three months ended June 30, 2026, net cash inflow from operating activities was US$286.5 million which is primarily attributable (i) profit before income tax of US$312.8 million (ii) depreciation of property, plant and equipment of US$31.9 million and (iii) amortization of mining rights of US$13.8 million, partially offset by and (i) income tax paid of US$44.3 million, (ii) increase in trade and other receivables of US$10.8 million and (iii) decrease in contract liabilities of US$9.9 million. For the six months ended June 30, 2026, net cash inflow from operating activities was US$555.2 million which is primarily attributable (i) profit before income tax of US$580.0 million (ii) depreciation of property, plant and equipment of US$62.1 million and (iii) decrease in inventories of US$22.7 million, partially offset by (i) income tax paid of US$64.4 million, (ii) increase in trade and other receivables of US$13.8 million and (iii) decrease in trade and other payables of US$12.3 million. Investing cash flow For the three months ended June 30, 2026, the net cash outflow from investing activities was US$46.0 million which is primarily attributable to (i) placement of term deposits of US$146.7 million and (ii) payment for acquisition of property, plant and equipment of US$6.7 million, offset by (i) redemption of term deposits of US$110.0 million and (ii) interest income received of US$2.5 million. For the six months ended June 30, 2026, the net cash outflow from investing activities was US$110.8 million which is primarily attributable to (i) placement of term deposits of US$348.2 million and (ii) payment for acquisition of property, plant and equipment of US$22.8 million, offset by (i) redemption of term deposits of US$261.1 million and (ii) interest income received of US$4.0 million. Financing cash flow For the three months ended June 30, 2026, the net cash outflow mainly from financing activities was US$265.4 million which is primarily attributable to (i) dividends paid to shareholders of US$186.3 million and (ii) repayment of bank and other borrowings of US$108.7 million. For the six months ended June 30, 2026, the net cash outflow mainly from financing activities was US$271.4 million which is primarily attributable to (i) dividends paid to shareholders of US$186.3 million and (ii) repayment of bank and other borrowings of US$113.7 million. Expenditures Incurred For the six months ended June 30, 2026, the Company incurred mining costs of US$25.5 million, mineral processing costs of US$54.4 million and transportation costs of US$1.5 million. Gearing ratio Gearing ratio is defined as the ratio of consolidated total debt to consolidated total equity. As at June 30, 2026, the Company’s total debt was US$463.3 million and the total equity was US$2,661.4 million. The Company’s gearing ratio was therefore 0.17 as at June 30, 2026 compared to 0.22 as at March 31, 2026.
- 21 -
MANAGEMENT’S DISCUSSION AND ANALYSIS SIGNIFICANT INVESTMENTS, ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES. ASSOCIATES AND JOINT VENTURES, AND FUTURE PLAN FOR MATERIAL INVESTMENTS OF CAPITAL ASSETS Other than as disclosed elsewhere in this MD&A or in the condensed consolidated financial statements for the six months ended June 30, 2026, there were no significant investments held by the Company, nor were there any material acquisitions or disposals of subsidiaries, associates and joint ventures during the six months ended June 30, 2026. Other than as disclosed in this MD&A, there was no plan authorized by the Board for other material investments or additions of capital assets at the date of this MD&A. CHARGE ON ASSETS Other than as disclosed elsewhere in this MD&A and condensed consolidated financial statements, none of the Company’s assets were pledged as at June 30, 2026. EXPOSURE TO FLUCTUATIONS IN EXCHANGE RATES AND RELATED HEDGES The Company is exposed to the financial risk related to the fluctuation of foreign exchange rates for the monetary assets and liabilities denominated in the currencies other than the functional currencies to which they relate. The Company has not hedged its exposure to currency fluctuation. However, the Management monitors foreign exchange exposure and will consider hedging significant foreign currency exposure should the need arise. Refer to Note 33, Financial Instruments, in the annual consolidated financial statements for the year ended December 31, 2025. COMMITMENTS Commitments include principal payments on the Company’s bank loans and syndicated loan facility, corporate bonds, and capital commitments in respect of the future acquisition of property, plant and equipment and construction for both the CSH Mine and the Jiama Mine. The Company’s capital commitments relate primarily to the payments for purchase of equipment and machinery for both mines and payments to third-party contractors for the provision of mining and exploration engineering work and mine construction work for both mines. The Company has entered into contracts that prescribe such capital commitments; however, liabilities relating to them have not yet been incurred. Refer to Note 34, Commitments, in the annual consolidated financial statements for the year ended December 31, 2025. The following table outlines payments for commitments for the periods indicated:
TotalWithin One year
Within Two
to five yearsOver five years
US$’000US$’000US$’000US$’000
Principal repayment of bank loans433,961169,068210,03354,860 Entrusted loan payable29,36529,365––
In addition to the table set forth above, the Company has entered into service agreements with third-party contractors for the provision of mining and exploration engineering work and mine construction work for the CSH Mine. The fees for such work performed and to be performed each year varies depending on the amount of work performed. The Company has similar agreements with third party contractors for the Jiama Mine.
- 22 -
MANAGEMENT’S DISCUSSION AND ANALYSIS RELATED PARTY TRANSACTIONS China National Gold Group Co., Ltd. (formerly known as China National Gold Group Corporation) (“CNG”) owned 40.01 percent of the outstanding common shares of the Company as at December 31, 2025 and June 30, 2026. The Company had major related party transactions with the following companies related by way of shareholders or shareholder in common: The Company’s subsidiary, Inner Mongolia Pacific is a party to a non-exclusive contract for the purchase and sale of doré with CNG (the “Dore Sales Contract”) pursuant to which Inner Mongolia Pacific sells gold doré bars to CNG. The pricing is based on the monthly average price of gold ingot as quoted on the Shanghai Gold Exchange and the daily average price of silver as quoted on the Shanghai Huatong Platinum & Silver Exchange prevailing at the time of each relevant purchase order during the contract period. The Dore Sales Contract has been in effect since October 24, 2008 and was renewed for a new term that commenced on January 1, 2018 and expired on December 31, 2020, which renewal was approved by the Company’s shareholders on June 28, 2017. On June 16, 2020, the third Supplemental Contract for Purchase and Sale of Dore was approved by the Company’s Shareholders, commencing on January 1, 2021 and expiring on December 31, 2023. On June 29, 2023, the fourth supplemental Contract for Purchase and Sale of Dore was approved by the Company’s Shareholders, commencing on January 1, 2024 and expiring on December 31, 2026. Revenue from sales of gold doré bars to CNG was US$224.5 million for the six months ended June 30, 2026 which increased from US$163.7 million for the six months ended June 30, 2025. The Company is also a party to a Product and Service Framework Agreement with CNG, pursuant to which CNG provides construction, procurement and equipment financing services to the Company and also purchases the copper concentrates produced at the Jiama Mine. The quantity of copper concentrates, pricing terms and payment terms may be established from time to time by the parties with reference to the pricing principles for connected transactions set out under the Product and Service Framework Agreement. On June 28, 2017, the Supplemental Product and Service Framework Agreement was approved and extended to expire on December 31, 2020. On June 16, 2020, the third Supplemental Product and Service Framework Agreement was approved by the Company’s Shareholders, commencing on January 1, 2021 and expiring on December 31, 2023. On June 29, 2023, the fourth Supplemental Product and Service Framework Agreement was approved by the Company’s Shareholders, commencing on January 1, 2024 and expiring on December 31, 2026. For the six months ended June 30, 2026, revenue from sales of copper concentrate and other products to CNG was US$686.5 million compared to US$412.9 million for the same period in 2025. For the six months ended June 30, 2026, construction services of US$33.9 million were provided to the Company by subsidiaries of CNG compared to US$66.7million for the same period in 2025. In addition to the aforementioned major related party transactions, the Company also obtains additional services from related parties in its normal course of business, including a Loan Agreement and a Deposit Services Agreement entered into on March 25, 2019, December 31, 2019, December 22, 2020 and a Financial Service Agreement on May 5, 2021 among the Company and China Gold Finance. The Company and China Gold Finance entered into a 2024 Financial Service Agreement on June 6, 2024. As part of the 2024 Financial Service Agreement, China Gold Finance agreed to provide the Company with a range of financial services including (a) Deposit Services, (b) Lending Services, (c) Settlement Services and (d) Other Financial Services. On June 27, 2024, the 2024 Financial Services Agreement was approved by the Company’s Shareholders, commencing on the date of the approval by the Independent Shareholders and up to and including December 31, 2026. Refer to Note 18 of the condensed consolidated financial statements for details of significant related party transactions during the six months ended June 30, 2026.
- 23 -
MANAGEMENT’S DISCUSSION AND ANALYSIS PROPOSED TRANSACTIONS The Board of Directors has given the Company approval to conduct reviews of a number of projects that may qualify as acquisition targets through joint venture, merger and/or outright acquisitions. The Company did not have any material acquisition and disposal of subsidiaries and associated companies for the six months ended June 30, 2026. The Company continues to review possible acquisition targets. CRITICAL ACCOUNTING ESTIMATES In the process of applying the Company’s accounting policies, the Directors of the Company have identified accounting judgments and key sources of estimation uncertainty that have a significant effect on the amounts recognized in the audited annual consolidated financial statements. Key assumptions concerning the future and other key sources of estimation uncertainty at the end of each reporting period that have a risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next twelve months are described in Note 4 of the audited annual consolidated financial statements for the year ended December 31, 2025. CHANGE IN ACCOUNTING POLICIES A summary of new and revised IFRS standards and interpretations are outlined in Note 2 of the audited annual consolidated financial statements as at December 31, 2025. FINANCIAL INSTRUMENTS AND OTHER INSTRUMENTS The Company holds a number of financial instruments, the most significant of which are equity securities, accounts receivables, accounts payables, cash and loans. The financial instruments are recorded at either fair values or amortized amount on the balance sheet. The Company did not have any financial derivatives or outstanding hedging contracts as at June 30, 2026. OFF-BALANCE SHEET ARRANGEMENTS As at June 30, 2026, the Company had not entered into any off-balance sheet arrangements. DIVIDEND AND DIVIDEND POLICY The Company’s dividend policy is a key component of its long-term growth strategy. It aims to optimize capital allocation to drive business expansion while maintaining stable returns for shareholders. After successfully distributing special dividends for three consecutive years (2021-2023), the Company is introducing an enhanced dividend policy comprised of a base dividend supplemented by a variable component that adjusts based on financial performance and market conditions. Basic dividend: Subject to profitability in the previous financial year and after assessing the Company’s cash flow position and future capital requirements, the Company aims to distribute a basic dividend at a payout ratio of 30% of the net profit from the preceding financial year, with cash dividends paid annually. Variable Component: Subject to favorable market conditions and sufficient funds, the Company may distribute special dividends in addition to the basic dividend. Dividends may vary in amount and consistency or be discontinued at the Board of Directors’ discretion depending on variables including but not limited to operational cash flows, Company development requirements and strategies, spot metal prices, taxation, general market conditions and other factors.
- 24 -
MANAGEMENT’S DISCUSSION AND ANALYSIS OUTSTANDING SHARES As of June 30, 2026 the Company had 396,413,753 common shares issued and outstanding. DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING Management is responsible for the design of disclosure controls and procedures (“DC&P”) and the design of internal control over financial reporting (“ICFR”) to provide reasonable assurance that material information relating to the Company, including its consolidated subsidiaries, is made known to the Company’s certifying officers. The Company’s Chief Executive Officer and Chief Financial Officer have each evaluated the Company’s DC&P and ICFR as of June 30, 2026 and, in accordance with the requirements established under Canadian National Instrument 52-109 – Certification of Disclosure in Issuer’s Annual and Interim Filings, the Chief Executive Officer and Chief Financial Officer have concluded that these controls and procedures were effective as of June 30, 2026, and provide reasonable assurance that material information relating to the Company is made known to them by others within the Company and that the information required to be disclosed in reports that are filed or submitted under Canadian securities legislation are recorded, processed, summarized and reported within the time period specified in those rules. The Company’s Chief Executive Officer and Chief Financial Officer have used the Committee of Sponsoring Organizations of the Treadway Commission (COSO) 2013 framework to evaluate the Company’s ICFR as of June 30, 2026 and have concluded that these controls and procedures were effective as of June 30, 2026 and provide reasonable assurance that financial information is recorded, processed, summarized and reported in a timely manner. Management is required to apply its judgment in evaluating the cost-benefit relationship of possible controls and procedures. The result of the inherent limitations in all control systems means design of controls cannot provide absolute assurance that all control issues and instances of fraud will be detected. During the six months ended June 30, 2026, there were no changes in the Company’s DC&P or ICFR that materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting. RISK FACTORS There are certain risks involved in the Company’s operations, some of which are beyond the Company’s control. Aside from risks relating to business and industry, the Company’s principal operations are located within the People’s Republic of China and are governed by a legal and regulatory environment that in some respects differs from that which prevails in other countries. Readers of this MD&A should give careful consideration to the information included in this document and the Company’s audited annual consolidated financial statements and related notes. Significant risk factors for the Company are metal prices, government regulations, foreign operations, environmental compliance, the ability to obtain additional financing, risk relating to recent acquisitions, dependence on management, title to the Company’s mineral properties, natural disasters, pandemics such as COVID-19 and litigation. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks. For details of risk factors, please refer to the Company’s annual audited consolidated financial statements, and Annual Information Form filed from time to time on SEDAR+ at www.sedarplus.ca and www.hkex.com.hk. QUALIFIED PERSON Disclosure of scientific or technical information in this MD&A was reviewed and approved by Mr. Tony Guo, MMSA(QP), the Company’s Qualified Person (“QP”) as defined by National Instrument 43-101. ADDITIONAL INFORMATION Additional information as required by the Hong Kong Stock Exchange in the half-year interim report and not shown elsewhere in this report is as follows:
- 25 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
A1. PURCHASE, SALE OR REDEMPTION OF THE COMPANY’S LISTED SECURITIES
Neither the Company nor any of its subsidiaries had purchased, sold or redeemed any of the Company’s listed securities
during the six months ended June 30, 2026.
A2. SUBSTANTIAL SHAREHOLDERS
Save as disclosed below, as of June 30, 2026, the Company’s directors were not aware of any other person (other than
a director or chief executive of the Company who had an interest or short position in the shares or underlying shares
of the Company as recorded in the register kept pursuant to Section 336 of the Securities and Futures Ordinance
(Cap 571 of the Laws of Hong Kong) (“SFO”):
Name Nature of interest
Number of
Shares held
Approximate
percentage of
outstanding
shares
China National Gold Group Co., Ltd. (1) Indirect158,588,330 (2) 40.01% China National Gold Group Hong Kong LimitedRegistered Owner158,588,33040.01%
Note:
- China National Gold Group Co., Ltd. directly and wholly owns the entire issued share capital of China National Gold Group Hong Kong Limited. Therefore, the interest attributable to China National Gold Group Co., Ltd. represents its indirect interest in the Company’s shares through its equity interest in China National Gold Group Hong Kong Limited.
- Information relating to registered and indirect ownership of the Company’s shares is provided by China National Gold Group Co., Ltd. A3. DIRECTORS’ AND CHIEF EXECUTIVES’ INTERESTS IN SHARES AND STOCK OPTIONS As of June 30, 2026, the interests of the directors and chief executive of the Company in the share capital, underlying shares and debentures of the Company or its associated corporations (within the meaning of Part XV of the SFO), as recorded in the register required to be kept by the Company pursuant to Section 352 of the SFO, or as otherwise notified to the Company and the Hong Kong Stock Exchange pursuant to the Model Code for Securities Transactions by Directors of Listed Issuer, were as follows: SHARES NamePositionCompany Number of shares held Nature of interest Approximate percentage of interest in the Company
Yingbin Ian He DirectorChina Gold International Resources Corp. Ltd. 50,000Personal0.013%
Other than as disclosed above, none of the directors, chief executive or their associates had any interests or short positions in any shares, underlying shares or debentures of the Company or its associated corporations as of June 30, 2026. A4. STOCK OPTION PLAN The Company adopted an incentive stock option plan with approval from its shareholders and pursuant to the policies of the Toronto Stock Exchange dated May 9, 2007. All options expired on June 1, 2015 and the 2007 Stock Option Plan has ceased to be in effect.
- 26 -
MANAGEMENT’S DISCUSSION AND ANALYSIS A5. EMOLUMENT POLICY The Company’s executive emolument policy and compensation program is administered by the Compensation and Benefits Committee. The Compensation and Benefits Committee reviews levels of cash compensation as needed and at least annually, and makes recommendations to the Board to adjust cash compensation in light of merit, qualifications and competence. The Compensation and Benefits Committee also reviews the corporate goals and objectives relevant to the compensation of the senior executive officers as needed and at least annually and based on recommendations from the Chief Executive Officer and other members of the management team. The Compensation and Benefits Committee makes its determinations as to overall compensation levels on the basis of both available third party data regarding comparable compensation at similar size companies as well as their own industry experience and the Company’s hiring and retention needs. Decisions relating to executive compensation are reported by the Compensation and Benefits Committee to the Board for approval. The Company’s director emolument policy is administered by the Compensation and Benefits Committee with regard to comparable market statistics. Decisions relating to the compensation of directors are reported by the Compensation and Benefits Committee to the Board for approval. As of June 30, 2026, the Company had 2,351 employees working at various locations. The emolument policy for the Company’s employees is determined on a department by department basis with the Chief Executive Officer determining the emoluments for employees and managers based on merit, qualifications and the Company’s hiring and retention needs. A6. COMPLIANCE WITH CORPORATE GOVERNANCE CODE The Company has, throughout the six months ended June 30, 2026, applied the principles and complied with the requirements of its corporate governance practices as defined by the Board and all applicable statutory, regulatory and stock exchange listings standards, in particular, the code provisions set out in the Corporate Governance Code contained in Appendix 14 of the Rules Governing the Listing Securities of The Stock Exchange of Hong Kong Limited (the “Hong Kong Listing Rules”). A7. COMPLIANCE WITH MODEL CODE ON DIRECTORS’ SECURITIES TRANSACTIONS The Company has adopted policies regarding directors’ securities transactions in its Corporate Disclosure, Confidentiality and Securities Trading Policy that has terms which are no less exacting than those set out in the Model Code for Securities Transactions by Directors of Listed Issuers contained in Appendix 10 to the Hong Kong Listing Rules. After specific enquiry with all members of the Board, the Board confirms that all of the directors of the Company have complied with the required policies in the Company’s Corporate Disclosure, Confidentiality and Securities Trading Policy throughout the six months ended June 30, 2026. A8. INTERIM DIVIDEND The Board did not recommend the payment of interim dividends in respect of the six months ended June 30, 2026. A9. AUDIT COMMITTEE Pursuant to the requirements under the Hong Kong Listing Rules, the Company has established an audit committee (the “Audit Committee”) comprising all the existing Independent Non-executive Directors, namely Ian He (chairman of the Audit Committee), Wei Shao, Bielin Shi and Ruixia Han. The Audit Committee has reviewed and discussed with the Company’s auditors the unaudited interim results of the Group for the three and six months ended June 30, 2026. August 13, 2026
- 27 -
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME For The Three And Six Months Ended June 30, 2026 (Unaudited) Three months ended June 30,Six months ended June 30, NOTES2026202520262025 US$'000US$'000US$'000US$'000 (unaudited)(unaudited)(unaudited)(unaudited) Revenue3461,013307,269914,216580,365 Cost of sales(133,675)(147,872)(294,108)(303,315)
Mine operating earnings327,338159,397620,108277,050
Expenses General and administrative expenses4(16,824)(12,068)(31,924)(24,300) Exploration and evaluation expenditure(61)(133)(232)(641) Research and development expenses(6,463)(5,256)(11,922)(8,552)
(23,348)(17,457)(44,078)(33,493)
Income from operations303,990141,940576,030243,557
Other income (expenses) Foreign exchange loss, net4,796(2,037)2,332(4,691) Interest and other income7,4024,9169,1056,725 Other expenses5–(987)–(987) Finance costs6(3,365)(4,580)(7,430)(9,582)
8,833(2,688)4,007(8,535)
Profit before income tax312,823139,252580,037235,022 Income tax expenses7(37,070)(22,909)(67,913)(32,700)
Profit for the period275,753116,343512,124202,322
Other comprehensive income for the period Item that will not be reclassified to profit or loss: Fair value (loss) gain on equity instruments at fair value through other comprehensive income (“FVTOCI”)(2,195)14,556(32,483)17,920 Item that may be reclassified subsequently to profit or loss: Exchange difference arising on translation7,3664,89233,5957,377
5,17119,4481,11225,297
- 28 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS
AND OTHER COMPREHENSIVE INCOME
Three months ended June 30,Six months ended June 30,
NOTES2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Total comprehensive income for the period280,924135,791513,236227,619
Profit for the period attributable to Non-controlling interests2,3491,0624,7612,028 Owners of the Company273,404115,281507,363200,294
275,753116,343512,124202,322
Total comprehensive income for
the period attributable to
Non-controlling interests2,3491,0624,7612,028
Owners of the Company278,575134,729508,475225,591
280,924135,791513,236227,619
Earnings per share – Basic and diluted
(US cents)968.9729.08127.9950.53
Weighted average number of common shares – Basic and diluted9396,413,753396,413,753396,413,753396,413,753
- 29 -
CONDENSED CONSOLIDATED STATEMENT OF
FINANCIAL POSITION
At June 30, 2026 (Unaudited)
NOTES
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Current assets
Cash and cash equivalents586,417399,402
Restricted bank balances43,48034,162
Term deposits10403,765305,884
Trade and other receivables1116,2368,246
Prepaid expenses and deposits127,1661,794
Inventories13271,820294,536
1,328,8841,044,024
Non-current assets Prepaid expenses and deposits1249074 Right-of-use assets14103,816104,519 Equity instruments at FVTOCI19101,398133,875 Property, plant and equipment141,338,1531,339,447 Intangible assets14714,777724,647 Other non-current assets10,2679,949
2,268,9012,312,511
Total assets3,597,7853,356,535
Current liabilities Accounts and other payables and accrued expenses15179,542181,828 Contract liabilities4810,063 Borrowings16169,068217,004 Entrustment Loan payable18(a)29,36528,454 Lease liabilities1,5171,417 Tax liabilities39,45025,253
418,990464,019
Net current assets909,894580,005
Total assets less current liabilities3,178,7952,892,516
- 30 -
At June 30, 2026 (Unaudited)
CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION
NOTES
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Non-current liabilities
Accounts and other payables and accrued expenses1517,48725,419
Borrowings16264,893287,981
Lease liabilities12,46212,628
Deferred tax liabilities124,940135,665
Deferred income1919
Environmental rehabilitation97,60893,778
517,409555,490
Total liabilities936,3991,019,509
Owners’ equity Share capital171,229,0611,229,061 Reserves274,950266,985 Retained profits1,127,291813,095
2,631,3022,309,141 Non-controlling interests30,08427,885
Total owners’ equity2,661,3862,337,026
Total liabilities and owners’ equity3,597,7853,356,535
The condensed consolidated financial statements were approved and authorised for issue by the Board of Directors on August 13, 2026 and are signed on its behalf by: (Signed by)(Signed by)
Chenguang HouYingbin Ian He DirectorDirector
- 31 -
CONDENSED CONSOLIDATED STATEMENT OF
CHANGES IN EQUITY
For The Three And Six Months Ended June 30, 2026 (Unaudited)
Attributable to owners of the Company
Number of
shares
Share
capital
Equity
reserve
Investment
revaluation
reserve
Exchange
reserve
Statutory
reserve
Retained
profitsSubtotal
Non-
controlling
interests
Total
owners’
equity
US$'000US$'000US$'000US$'000US$'000US$'000US$'000US$'000US$'000
At January 1, 2025396,413,7531,229,06111,17927,589(70,298)131,267433,6401,762,43823,7681,786,206
Profit for the period––––––200,294200,2942,028202,322 Fair value gain on equity instruments at FVTOCI–––17,920–––17,920–17,920 Exchange difference arising on translation––––7,377––7,377–7,377
Total comprehensive income for the period–––17,9207,377–200,294225,5912,028227,619
Transfer to statutory reserve
– safety production fund–––––2,544(2,544)–––
Dividends paid to shareholders of the Company––––––(31,713)(31,713)–(31,713)
Dividends paid to a non-controlling shareholder––––––––(1,237)(1,237)
At June 30, 2025 (unaudited)396,413,7531,229,06111,17945,509(62,921)133,811599,6771,956,31624,5591,980,875
At January 1, 2026396,413,7531,229,06111,179113,053(44,305)187,058813,0952,309,14127,8852,337,026
Profit for the period––––––507,363507,3634,761512,124 Fair value gain on equity instruments at FVTOCI–––(32,483)–––(32,483)–(32,483) Exchange difference arising on translation––––33,595––33,595–33,595
Total comprehensive income for the period–––(32,483)33,595–507,363508,4754,761513,236
Transfer to statutory reserve
– safety production fund–––––9,650(9,650)–––
Transfer to retained earnings
– safety production fund–––––(2,797)2,797–––
Dividends paid to shareholders of the Company––––––(186,314)(186,314)–(186,314)
Dividends declared to a
non-controlling shareholder––––––––(2,121)(2,121)
Dividends paid to a non-controlling shareholder––––––––(441)(441)
At June 30, 2026 (unaudited)396,413,7531,229,06111,17980,570(10,710)193,9111,127,2912,631,30230,0842,661,386
- 32 -
CONDENSED CONSOLIDATED STATEMENT OF
CASH FLOWS
For The Three And Six Months Ended June 30, 2026 (Unaudited)
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Net cash from operating activities286,477191,318555,180334,848
Investing activities Interest income received2,493–4,044737 Payment for acquisition of property, plant and equipment(6,721)(4,581)(22,774)(29,301) Proceeds from disposal of property, plant and equipment–12312 Payment for right-of-use assets(1)(17,674)(1)(17,674) Payment for land use right(5,072)(2,688)(5,072)(2,688) Placement of term deposits(146,711)(20,756)(348,170)(132,240) Withdrawal of term deposits110,034–261,12848,774
Net cash used in investing activities(45,978)(45,687)(110,842)(132,380)
Financing activities Proceeds from borrowings30,00079,00030,00079,000 Repayment of borrowings(108,701)(124,170)(113,701)(124,170) Dividends paid to shareholders of the Company(186,314)(31,713)(186,314)(31,713) Dividends paid to a non-controlling shareholder–(929)(441)(1,237) Payment for lease(418)(25)(932)(52)
Cash used in financing activities(265,433)(77,837)(271,388)(78,172)
Net (decrease)/increase in cash and cash
equivalents(24,934)67,794172,950124,296
Cash and cash equivalents, beginning of period603,438240,492399,402183,779
Effect of foreign exchange rate changes on
cash and cash equivalents7,91390914,0651,120
Cash and cash equivalents, end of period586,417309,195586,417309,195
Cash and cash equivalents are comprised of
cash and bank deposits586,417309,195586,417309,195
- 33 -
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
For The Three And Six Months Ended June 30, 2026 (Unaudited)
- BASIS OF PREPARATION AND SIGNIFICANT EVENT DURING THE CURRENT PERIOD 1.1 Basis of preparation China Gold International Resources Corp. Ltd., (the “Company”) is a publicly listed company incorporated in British Columbia, Canada on May 31, 2000 with limited liability under the legislation of the Province of British Columbia and its shares are listed on the Toronto Stock Exchange and The Stock Exchange of Hong Kong Limited (the “Stock Exchange”). The Company together with its subsidiaries (collectively referred to as the “Group”) is principally engaged in the acquisition, exploration, development and mining of mineral resources in the People’s Republic of China (the “PRC”). The Group considers that China National Gold Group Co., Ltd. (“CNG”), a state owned company registered in Beijing, the PRC which is controlled by State-owned Assets Supervision and Administration Commission of the State Council of the PRC, is able to exercise significant influence over the Company. The head office, principal address and registered and records office of the Company are located at Suite 1780, 400 Burrard Street, Vancouver, British Columbia, Canada, V6C 3A6. The condensed consolidated financial statements have been prepared in accordance with the applicable disclosure requirements of the Rules Governing the Listing of Securities on the Stock Exchange as well as International Accounting Standard 34 Interim Financial Reporting issued by the International Accounting Standards Board (“IASB”), which should be read in conjunction with the consolidated financial statements for the year ended December 31, 2025. The condensed consolidated financial statements are presented in United States Dollars (“US$”), which is the functional currency of the Company. 1.2 Significant event during the current period (a) A localised slope instability event On May 22, 2026, a localised slope instability event occurred at its CSH Gold Mine in Inner Mongolia. The event was primarily attributed to heavy rainfall in the area during May 15 to 16, 2026, combined with complex geological conditions, which triggered a localized geological hazard. Mining activities at the open pit remain temporarily suspended pending further geotechnical and operational assessment. Processing operations continue utilising available low-grade ore stockpiles to maintain production. The Company has engaged external geotechnical specialists and professional consultants to assist with the ongoing assessment and remediation planning. The Company is currently assessing the potential impact of the event on mining operations and future production plans. Based on the information currently available, the Company does not expect the event to materially affect its annual production guidance. The assessment remains ongoing.
- 34 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
- BASIS OF PREPARATION AND SIGNIFICANT EVENT DURING THE CURRENT PERIOD (Cont’d) 1.2 Significant event during the current period (Cont’d) (b) Updates on Mineral Resource and Reserve Estimates The Company has completed mineral resource and reserve estimate update and the NI 43-101 Technical Report with respect to the Mineral Resource and Reserve Estimates Update for the Jiama Copper Polymetallic Project in Tibet Autonomous Region, the People’s Republic of China. Mineral Resource estimate and a Mineral Reserve estimate, dated effective June 30, 2026, has been completed by Changchun Gold Design Institute in accordance with the CIM Definition Standards and Best Practice Guidelines under NI 43-101. The updated Mineral Resource significantly expands the Project’s scale and development potential, providing a robust foundation for future production expansion, mine life extension and further technical studies on larger-scale mining scenarios. Please refer to the Company’s announcement dated June 30, 2026 for details on the updates on Mineral Resources and Reserve Estimates.
- ACCOUNTING POLICIES AND APPLICATION OF AMENDMENTS TO INTERNATIONAL FINANCIAL REPORTING STANDARDS (“IFRSS”) The condensed consolidated financial statements have been prepared on the historical cost basis except for certain financial instruments, which are measured at fair values. Except as described below, the accounting policies and methods of computation used in the condensed consolidated financial statements for the six months ended June 30, 2026 are the same as those presented in the Group’s annual financial statements for the year ended December 31, 2025. In the current interim period, the Group has applied the following amendments to IFRSs issued by IASB, which are mandatorily effective for the Group’s annual period beginning on January 1, 2026 for the preparation of the Group’s condensed consolidated financial statements: Amendments to IFRS 9 and IFRS 7Amendments to the Classification and Measurement of Financial Instrument Amendments to IFRS 9 and IFRS 7Contracts Referencing Nature-dependent Electricity Amendments to IFRS Accounting Standards Annual Improvement to IFRS Accounting Standards – Volume 11 The application of the amendments to IFRSs in the current interim period has had no material impact on the Group’s financial positions and performance for the current and prior periods and/or on the disclosures set out in these condensed consolidated financial statements.
- 35 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
3. REVENUE AND SEGMENT INFORMATION
Revenue
(i) Disaggregation of revenue from contracts with customers
The following is an analysis of the Group’s revenue from its major products and services:
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
At a point in time
Gold doré bars97,75084,576224,455163,670
Copper189,178110,720359,837204,216
Other by-products174,085111,973329,924212,479
Total revenue461,013307,269914,216580,365
(ii) Performance obligations for contracts with customers The Group sells gold doré bars, copper and other by-products directly to customers. Revenue is recognised at a point in time when control of the gold doré bars, copper and other by-products is passed to customers, i.e. when the products are delivered and titles have passed to customers. A contract liability represents the Group’s obligation to transfer goods or services to a customer for which the Group has received consideration (or an amount of consideration is due) from the customer. Segment information IFRS 8 requires operating segments to be identified on the basis of internal reports that are regularly reviewed by the chief operating decision-maker (“CODM”) to allocate resources to the segments and to assess their performance. The CODM, who is responsible for allocating resources and assessing performance of the operating segments, has been defined as the executive directors of the Company. The CODM has identified two operating and reportable segments as follows: (i) The mine-produced gold segment – the production of gold doré bars through the Group’s integrated processes, i.e., mining, metallurgical processing, production and selling of gold doré bars to external clients. (ii) The mine-produced copper concentrate segment – the production of copper concentrate including other by- products through the Group’s integrated processes, i.e., mining, metallurgical processing, production and selling of copper concentrate including other by-products to external clients.
- 36 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
3. REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information (Cont’d)
Information regarding the above segments is reported below:
(a) Segment revenue and results
The following is an analysis of the Group’s revenue and results by operating and reportable segment.
For the six months ended June 30, 2026
Mine-produced
gold
Mine-produced
copper
concentrateSegment totalUnallocatedConsolidated
US$'000US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)(unaudited)
Revenue – external and segment revenue224,455689,761914,216–914,216
Cost of sales(84,756)(209,352)(294,108)–(294,108)
Mining operating earnings139,699480,409620,108–620,108
Income (loss) from operations139,467438,750578,217(2,187)576,030 Foreign exchange (loss) gain, net3,4541,5655,019(2,687)2,332 Interest and other income2,7983,4176,2152,8909,105 Finance costs(156)(4,935)(5,091)(2,339)(7,430)
Profit (loss) before income tax145,563438,797584,360(4,323)580,037
- 37 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
3. REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information (Cont’d)
(a) Segment revenue and results (Cont’d)
For the six months ended June 30, 2025
Mine-produced
gold
Mine-produced
copper
concentrateSegment totalUnallocatedConsolidated
US$'000US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)(unaudited)
Revenue – external and segment revenue163,670416,695580,365–580,365
Cost of sales(85,622)(217,693)(303,315)–(303,315)
Mining operating earnings78,048199,002277,050–277,050
Income (loss) from operations77,406168,133245,539(1,982)243,557 Foreign exchange (loss) gain, net(4,608)(85)(4,693)2(4,691) Interest and other income1,6692,0623,7312,9946,725 Other expenses–(987)(987)–(987) Finance costs(172)(7,263)(7,435)(2,147)(9,582)
Profit (loss) before income tax74,295161,860236,155(1,133)235,022
The accounting policies of the operating segments are the same as the Group’s accounting policies. Segment results represent profit (loss) before income tax, without allocation of certain general and administrative expenses, foreign exchange gain (loss), interest and other income and finance costs, attributable to the respective segment. This is the measure reported to the CODM for the purposes of resource allocation and performance assessment. There are no inter-segment sales for the six months ended June 30, 2026 and 2025.
- 38 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
3. REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information (Cont’d)
(b) Segment assets and liabilities
The following is an analysis of the Group’s assets and liabilities by segment representing assets/liabilities directly
attributable to respective segment:
Mine-produced
gold
Mine-produced
copper
concentrateSegment totalUnallocatedConsolidated
US$'000US$'000US$'000US$'000US$'000
As of June 30, 2026
(unaudited)
Total assets822,0262,633,5193,455,545142,2403,597,785
Total liabilities47,256811,577858,83377,566936,399
As of December 31, 2025 (audited) Total assets750,9102,451,1313,202,041154,4943,356,535 Total liabilities50,237887,806938,04381,4661,019,509
For the purposes of monitoring segment performance and allocating resources between segments: • all assets are allocated to operating segments other than certain of cash and cash equivalents, other receivables, prepaid expenses and deposits, dividend receivables, right-of-use assets, property, plant and equipment and equity instruments at FVTOCI; and • all liabilities are allocated to operating segments other than other payables and accrued expenses, lease liabilities, deferred income and certain borrowings.
- 39 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
4. GENERAL AND ADMINISTRATIVE EXPENSES
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Administration and office expenses3,9621,4645,8624,145
Depreciation of property, plant and
equipment1,6741,5673,5503,165
Depreciation of right-of-use assets13–2624
Professional fees5871,1211,2131,635
Salaries and benefits5,3165,02810,4019,987
Others5,2722,88810,8725,344
Total general and administrative expenses16,82412,06831,92424,300
- OTHER EXPENSES Three months ended June 30,Six months ended June 30, 2026202520262025 US$'000US$'000US$'000US$'000 (unaudited)(unaudited)(unaudited)(unaudited) Provision for litigation compensation and related interest charge–830–830 Others–157–157
Total other expenses–987–987
- 40 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
6. FINANCE COSTS
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Interests on borrowings2,7853,8746,2768,150
Interests on provision for mining rights276199429398
Interests on lease liabilities661027921
Accretion on environmental rehabilitation4266828451,366
3,5534,7657,8299,935 Less: Amounts capitalised to property, plant and equipment(188)(185)(399)(353)
Total finance costs3,3654,5807,4309,582
- INCOME TAX EXPENSES
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Current tax:
PRC Enterprise Income Tax (“EIT”)33,36515,27463,30327,651
PRC withholding income tax
on dividend paid6,414–6,414– Underprovision of PRC EIT in prior year5,4775788,921578
45,25615,85278,63828,229
Deferred tax: PRC EIT(8,186)7,057(10,725)4,471
(8,186)7,057(10,725)4,471
Total income tax expenses37,07022,90967,91332,700
- 41 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
8. DIVIDEND
During the six months ended June 30, 2026, a dividend in respect of the year ended December 31, 2025 of US$0.47
per common share (including basic dividend of US$0.35 per common share and special dividend of US$0.12 per
common share) in an aggregate amount of US$186,314,000 was declared and paid to the shareholders of the Company.
During the six months ended June 30, 2025, a dividend in respect of the year ended December 31, 2024 of US$0.08
per common share (including basic dividend of US$0.05 per common share and special dividend of US$0.03 per
common share) in an aggregate amount of US$31,713,000 was declared and paid to the shareholders of the Company.
9. EARNINGS PER SHARE
Profit used in determining earnings per share are presented below:
Three months ended June 30,Six months ended June 30,
2026202520262025
(unaudited)(unaudited)(unaudited)(unaudited)
Profit for the period attributable to owners
of the Company for the purposes of basic
earnings per share (US$'000)273,404115,281507,363200,294
Weighted average number of shares, basic396,413,753396,413,753396,413,753396,413,753
Basic earnings per share
(US cents)68.9729.08127.9950.53
The Group has no outstanding potential dilutive instruments issued as at June 30, 2026 and 2025 and during the three and six months ended June 30, 2026 and 2025. Therefore, no diluted earnings per share is presented. 10. TERM DEPOSITS As at June 30, 2026, term deposits with original maturity of one year (December 31, 2025: one year) carries interest at fixed market rate ranging from 1.2% to 1.7% per annum (December 31, 2025: ranging from 1.15% to 1.7%) per annum.
- 42 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
11. TRADE AND OTHER RECEIVABLES
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Trade receivables4,2252,111
Less: allowance for credit losses(295)(344)
3,9301,767 Amounts due from related companies (note 18(a)) (1) 3,2732,762 Other receivables9,0333,717
Total trade and other receivables16,2368,246
(1) The amounts are unsecured, interest free and repayable on demand.
The Group allows an average credit period of 30 days and 180 days to its trade customers.
Below is an aged analysis of trade receivables (net of allowance for credit losses) presented based on invoice dates,
which approximated the respective revenue recognition dates, at the end of the reporting period:
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Less than 30 days2,047714
31 to 90 days425241
91 to 180 days4803
Over 180 days978809
3,9301,767
- 43 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
12. PREPAID EXPENSES AND DEPOSITS
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Deposit paid for acquisition of property, plant and equipment49074
Other prepayment and deposits7,1661,794
7,6561,868
Less: Amounts that will be settled or utilised within one year
shown under current assets(7,166)(1,794)
Amounts that will be settled or utilised for more than one year
shown under non-current assets49074
- INVENTORIES
June 30,
2026 December 31, 2025 US$'000US$'000 (unaudited)(audited) Gold in process235,525249,498 Gold doré bars–8,283 Consumables7,6929,713 Copper concentrate4,3925,017 Spare parts24,21122,025
Total inventories271,820294,536
Cost of inventory sold totaling US$132 million and US$291 million for the three and six months ended June 30, 2026, respectively (three and six months ended June 30, 2025: US$141 million and US$289 million, respectively) was recognised in cost of sales.
- 44 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
14. PROPERTY, PLANT AND EQUIPMENT/MINING RIGHTS/RIGHT-OF-USE ASSETS
During the six months ended June 30, 2026, the Group incurred approximately US$17.8 million on construction in
progress (for the six months ended June 30, 2025: approximately US$1.8 million) and approximately US$0.8 million
on mineral assets (for the six months ended June 30, 2025: approximately US$6.4 million), respectively.
Depreciation of property, plant and equipment was US$31.9 million and US$62.1 million for the three and six months
ended June 30, 2026, respectively (for the three and six months ended June 30, 2025: US$37.0 million and US$70.1
million, respectively). The depreciation amount was partly recognised in cost of sales, general and administrative
expenses, research and development expenses and partly capitalised in inventory.
No addition of mining rights was incurred during the six months ended June 30, 2026 and 2025. Amortisation of
mining rights was US$13.8 million and US$19.9 million for the three and six months ended June 30, 2026, respectively
(for the three and months ended June 30, 2025: US$7.3 million and US$14.2 million, respectively). The amortisation
amounts were recognised in cost of sales.
During the six months ended June 30, 2025, the Group paid farmland use tax and grassland compensation fee in
relation to leasehold lands and recognised right-of-use assets of US$41.7 million. No payment of farmland use tax
and grassland compensation fee was paid and no respective right-of-use assets has been recognised during the six
months ended June 30, 2026.
15. ACCOUNTS AND OTHER PAYABLES AND ACCRUED EXPENSES
Accounts and other payables and accrued expenses comprise the following:
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Accounts payable35,52836,021
Construction cost payables88,46691,181
Mining loyalties payable (Note)37,95150,577
Payable for acquisition of a mining right–1,201
Payroll and benefit payables5,4292,085
Mining cost accrual2,8711,544
Other accruals3,5742,472
Other tax payable17,71813,006
Other payables5,4929,160
Total accounts and other payables and accrued expenses197,029207,247
Current179,542181,828 Non-current17,48725,419
197,029207,247
- 45 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
15. ACCOUNTS AND OTHER PAYABLES AND ACCRUED EXPENSES (Cont’d)
Note:
As stipulated in an agreement with local authorities and relevant government notices. Since 2017, the Group is required to pay royalties to
the PRC government for the use of state-owned natural resources in relation to the Jiama Mine, calculated based on invoiced revenue and
ore yield. The royalties payable for 2017 to May 2023 was allowed to be settled with six fixed annual instalments of RMB61.3 million each,
totalling RMB368 million with first instalment payable from 2024 and final instalment due in 2029. The royalties from May 2023 onwards
are payable annually.
The following is an aged analysis of the accounts payable presented based on invoice date at the end of the reporting
period:
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Less than 30 days10,56720,779
31 to 90 days8,5254,561
91 to 180 days7,6331,593
Over 180 days8,8039,088
Total accounts payable35,52836,021
The credit period for bills payable is 180 days from the issue date.
16. BORROWINGS
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Bank loans407,533422,467
Loans payable to a CNG’s subsidiary (note 18(a))26,42882,518
433,961504,985
- 46 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
16. BORROWINGS (Cont’d)
The borrowings are repayable as follows:
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Carrying amount repayable within one year169,068217,004
Carrying amount repayable within one to two years110,118107,415
Carrying amount repayable within two to five years99,915111,756
Carrying amount repayable over five years54,86068,810
433,961504,985 Less: Amounts due within one year (shown under current liabilities)(169,068)(217,004)
Amounts shown under non-current liabilities264,893287,981
Analysed as: Secured185,806197,119 Unsecured248,155307,866
433,961504,985
The carrying values of the pledged assets to secure borrowings by the Group are as follows:
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Mining rights712,960723,579
Borrowings carry interest at effective interest rates ranging from 1.25% to 4.36% (December 31, 2025: 1.25% to 4.36%) per annum. In respect of a bank loan with a carrying amount of US$333,533,000 as at June 30, 2026 (December 31, 2025: US$343,467,000), the Group is required to comply with certain significant financial covenants throughout the continuance of the relevant bank loans and/or as long as the bank loans are outstanding. The Group has complied with all covenants throughout the reporting period.
- 47 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
17. SHARE CAPITAL
Common shares
(i) Authorised – Unlimited common shares without par value
(ii) Issued and outstanding
Number of sharesAmount
US$'000
Issued and fully paid:
At January 1, 2025, December 31, 2025 and June 30, 2026396,413,7531,229,061
- SIGNIFICANT RELATED PARTY TRANSACTIONS
Related parties are those parties that have the ability to control the other party or exercise significant influence in making
financial and operation decisions. Parties are also considered to be related if they are subject to common control. CNG,
a state owned company registered in Beijing, the PRC, which is controlled by State-owned Assets Supervision and
Administration Commission of the State Council of the PRC, is able to exercise significant influence over the Company.
In accordance with IAS 24 “Related party disclosures”, the management believes that information relating to related
party transactions have been adequately disclosed in conformity of the IFRSs.
In addition to the related party transactions and balances shown elsewhere in these condensed consolidated financial
statements, the following is a summary of significant related party transactions entered into in the ordinary course of
business between the Group and its related parties for the three and six months ended June 30, 2026 and 2025,
and related party balances as at June 30, 2026 and December 31, 2025.
Name and relationship with related parties during the period/year are as follows:
CNG owned the following percentages of outstanding common shares of the Company:
June 30,
2026 December 31, 2025 %% CNG40.0140.01
- 48 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
18. SIGNIFICANT RELATED PARTY TRANSACTIONS (Cont’d)
(a) Transactions/balances with CNG and its subsidiaries
The Group had the following significant transactions with CNG and CNG’s subsidiaries:
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Gold doré bars sales by the Group97,75084,576224,455163,670
Copper and other by-products sales
by the Group361,586220,870686,453412,947
Provision of transportation services
by the Group6885671,2931,059
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Construction, stripping and mining
services provided to the Group14,25034,13833,86166,705
Accrued property management fee119113236226
Commitment fee151147299296
Interest income8071,3731,6312,598
Interest expenses on loans payable
to a CNG’s subsidiary and
entrusted loan payable5786221,2081,232
Interest expenses on lease liabilities5111121
- 49 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
18. SIGNIFICANT RELATED PARTY TRANSACTIONS (Cont’d)
(a) Transactions/balances with CNG and its subsidiaries (Cont’d)
The Group has the following significant balances with CNG and its subsidiaries at the end of each reporting period:
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Assets
Amounts due from related companies (note 11)3,2732,762
Cash and cash equivalents held in a CNG’s subsidiary333,524179,182
Term deposits held in a CNG’s subsidiary132,141206,294
468,938388,238
Other than the cash and cash equivalents and restricted balances held in a CNG’s subsidiary, the remaining
amounts due from related companies as at June 30, 2026 and December 31, 2025, which are included in trade
and other receivables are non-interest bearing, unsecured and payable on demand.
June 30,
2026
December 31,
2025
US$'000US$'000
(unaudited)(audited)
Liabilities
Entrusted loan payable to a CNG’s subsidiary29,36528,454
Loans payable to a CNG’s subsidiary26,42882,518
Construction costs payable to CNG’s subsidiaries10,82612,207
Trade payable to CNG’s subsidiaries2,1212,246
Amount due to CNG1,8511,786
Contract liabilities with a CNG’s subsidiary2110,025
Lease liabilities to a CNG’s subsidiary496469
Total amounts due to CNG’s subsidiaries71,108137,705
Trade payable, construction costs payable and contract liabilities to CNG’s subsidiaries are in trade nature, non-interest bearing and unsecured. Amount due to CNG included in other payables is non-trade in nature, non-interest bearing, unsecured and have no fixed term of repayment. Entrusted loan payable, loans payable and lease liabilities to CNG and its subsidiaries are non-trade in nature, interest-bearing, unsecured and have fixed term of repayment.
- 50 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
18. SIGNIFICANT RELATED PARTY TRANSACTIONS (Cont’d)
(b) Compensation of key management personnel
The Group has the following compensation to key management personnel during the period:
Three months ended June 30,Six months ended June 30,
2026202520262025
US$'000US$'000US$'000US$'000
(unaudited)(unaudited)(unaudited)(unaudited)
Salaries and other benefits8884195186
Post-employment benefits651312
9489208198
- FINANCIAL INSTRUMENTS As at June 30, 2026 and December 31, 2025, the Group’s investments in equity securities include equity securities listed on the Stock Exchange and unlisted companies incorporated in the PRC. Investment in equity securities listed on the Stock Exchange of US$101,195,000 (December 31, 2025: US$133,678,000) is measured based on the unadjusted quoted price available on the Stock Exchange (Level 1 fair value measurement). The Group’s investment in listed equity securities represent investment in a company engaged in mining, processing and trading of nonferrous metals registered in Hong Kong, PRC. In addition, investment in an unlisted company incorporated in the PRC of US$203,000 (December 31, 2025: US$197,000) are measured at fair value based on Level 3 inputs. The Group considers that the carrying amounts of financial assets and financial liabilities recorded at amortised cost in the condensed consolidated financial statements approximate their fair values.
- 51 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
20. CONTINGENCIES
Except as described below, there has been no significant update of the contingencies as detailed in the Group’s annual
financial statements for the year ended December 31, 2025.
Litigation with Huaxin Construction Group Co., Ltd. (“Huaxin”) and Zhongxinfang
During the year ended December 31, 2020, there was a construction contract dispute between independent third
parties including Huaxin (the constructor), Zhongxinfang, and the Company’s subsidiary, Tibet Huatailong Mining
Development Co. Ltd. (“Huatailong”). The land use right of a composite project under the construction contract
was transferred from Huatailong to Zhongxinfang in 2019 pursuant to the cooperation agreement (the “Cooperation
Agreement”) whereby the Group agreed to transfer the land use right for the development and Zhongxinfang agreed
to compensate the Group by transferring a block of the buildings and twenty car parks (the “New Premises”) to the
Group within two years from the date of the Cooperation Agreement (the “Land Exchange”).
(a) Litigations with Huaxin and Zhongxinfang for the construction costs
Since 2020, there were legal proceedings on the Construction Contract between Huaxin, Zhongxinfang and
Huatailong of which details were disclosed in the Group’s annual financial statements for the year ended
December 31, 2025.
In 2025, Huatailong has paid to the Lhasa Intermediate Court the full compensation amount of RMB178 million
(equivalent to US$24,869,000) for the settlement of accumulated litigation compensation and additional interest
recognised, of which RMB35 million (equivalent to US$4,870,000) was paid to Huaxin as partial settlement and
the remaining RMB143 million has been frozen by the Lhasa Intermediate Court pending for the resolution of a
separate countersuit by Huatailong against Zhongxinfang as further detail in note 20(b) below.
On September 16, 2025, subsequent to the full settlement payment mentioned above, Huatailong received
a civil ruling from the People’s Court of Duilongdeqing District, Lhasa (“PCDDL”), which ordered the freezing
of certain bank accounts of Huatailong with a total value of approximately RMB59.6 million (equivalent to
approximately US$8,320,000). This freezing is a pre-litigation asset preservation measure initiated by Huaxin in
connection with a potential lawsuit to be filed by Huaxin on claiming the remaining unpaid contract balance of
the Construction Contract of approximately RMB52.0 million and accrued interest, which Huaxin is now pursuing
against Huatailong after being unable to recover it from the insolvent co-obligor, Zhongxinfang. The freezing
period is one year, from August 29, 2025 to August 28, 2026.
On January 6, 2026, Huaxin formally filed its claim against Huatailong. On July 1, 2026, PCDDL suspended
the proceedings, citing that the outcome is contingent upon a separate Lhasa Intermediate Court case. In that
related action, Huatailong is suing Huaxin for RMB100 million in quality defect damages and RMB74 million in
unreasonable pricing increment; judicial appraisal is ongoing.
As of the end of the reporting period, the aggregated amounts frozen remains approximately RMB29.80 million
(equivalent to US$4,375,000). The freezing has not materially impacted Huatailong’s normal operations due to
sufficient working capitals maintained in other accounts. No outstanding litigation compensation payable exists
in relation to litigation with Huaxin as of June 30, 2026.
- 52 -
For The Three And Six Months Ended June 30, 2026 (Unaudited)
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
20. CONTINGENCIES (Cont’d)
Litigation with Huaxin Construction Group Co., Ltd. (“Huaxin”) and Zhongxinfang (Cont’d)
(b) Litigations with Zhongxinfang for the recovery of construction costs
During the year ended December 31, 2020, Huatailong filed a lawsuit against Zhongxinfang for the recovery of the
construction costs of RMB149 million (equivalents to US$21,319,000) that shall be jointly borne by Huatailong.
After the first instance adjudication and appeals by Zhongxinfang, on June 20, 2023, Tibet High Court adjudicated
that the September 2020 Adjudication sustained (the “June 2023 Zhongxinfang Final Instance Adjudication”) and
Zhongxinfang should pay relevant compensation to Huatailong within 15 days from the effective date of the June
2023 Zhongxinfang Final Instance Adjudication. On 15 September 2023, Huatailong applied for an enforcement
of the June 2023 Zhongxinfang Final Instance Adjudication (the “September 2023 Enforcement”) and as at June
30, 2026 and up to the date of these condensed consolidated financial statements are authorised for issue,
Zhongxinfang has not yet paid the compensation to Huatailong and the September 2023 Enforcement is not
executed mainly because Zhongxinfang is involved in several litigations and there are no executable properties.
(c) Litigations with Zhongxinfang for the delivery of New Premises and recovery of tax and other surcharge
During 2020 and 2021, Huatailong proceeded lawsuits against Zhongxinfang concerning (i) the delivery of
certain premises (the “New Premises”) and a penalty, and (ii) the recovery of Tax and Other Surcharges paid
by Huatailong amounting to RMB46 million (equivalent to USD6.4 million), respectively. Pre-litigation asset
preservation measures are in place with (i) the New Premises comprising a block of buildings and twenty car
parks from Zhongxinfang were frozen and (ii) the value of certain properties limited to RMB46 million (equivalent
to US$6,609,000) from Zhongxinfang was frozen (collectively the “Pre-litigation Preservations”). As at June 30,
2026, the Pre-litigation Preservations were extended to May 2027.
Based on the adjudication issued in relation to the lawsuit against Zhongxinfang, Zhongxinfang shall repay the Tax
and Other Surcharge to Huatailong. As Zhongxinfang has not settled such amount within the due date, Huatailong
applied for an enforcement of the November 2020 Adjudication in January 2021 (the “2021 Enforcement”).
However, on June 24, 2021, the Tibet Intermediate Court adjudicated the 2021 Enforcement be suspended as
all of the assets owned by Zhongxinfang have been sealed up or frozen and there are no executable properties
from Zhongxinfang.
As at June 30, 2026 and up to the date these condensed consolidated financial statements are authorised for
issue, the New Premises are still not delivered to Huatailong. In the opinion of directors, (i) the 2021 Enforcement is
currently suspended and the Group’s first priority of claim over one of the assets under Pre-litigation Preservations
has been extended to May 2027, (ii) the enforcement of the adjudication that Zhongxinfang should pay penalty
of RMB9 million to Huatailong that was applied by Huatailong in March 2023 is currently under proceeding and
the result is not ascertained as at the date these condensed consolidated financial statements are authorised
for issue. Further background on these matters is disclosed in the Group’s annual financial statements for the
year ended December 31, 2025 and 2024.
21. EVENT AFTER THE REPORTING PERIOD
Other than those disclosed in notes to the condensed financial statements, the Group had no material event after the
end of the reporting period.
- 53 -
CORPORATE GOVERNANCE
The Company has complied with the code provisions under the Code on Corporate Governance Practices
(the “Code”) set out in Appendix C1 to the Rules Governing the Listing of Securities on the Stock
Exchange of Hong Kong Limited (the “Listing Rules”) during the six months ended June 30, 2026.
MODEL CODE FOR SECURITIES TRANSACTIONS
The Company has adopted policies in its Corporate Disclosure, Confidentiality and Securities Trading
Policy that has terms which are no less exacting than those set out in Appendix C3 to the Listing Rules
(the “Model Code”). The Board is pleased to confirm, after specific enquiries with all Directors, that
all Directors have fully complied with standards required according to the Model Code during the six
months ended June 30, 2026.
PURCHASE, SALE OR REDEMPTION OF THE COMPANY’S LISTED SECURITIES
For the six months ended June 30, 2025, neither the Company nor any of its subsidiaries has purchased,
sold or redeemed any of the Company’s listed securities.
AUDIT COMMITTEE
Pursuant to the requirements of the Code and the Listing Rules, the Company has established an audit
committee (the “Audit Committee”) comprising all the existing Independent Non-executive Directors,
namely Mr. Yingbin Ian He, (Chairman of the Audit Committee), Mr. Wei Shao, Mr. Bielin Shi, and
Ms. Ruixia Han.
The Audit Committee has reviewed the condensed consolidated financial statements for the three and
six months ended June 30, 2026, and is of the view that the Group’s condensed consolidated financial
statements for the three and six months ended June 30, 2026 are prepared in accordance with the
applicable accounting standard, laws and regulations, and appropriate disclosures have already been
made.
By Order of the Board
China Gold International Resources Corp. Ltd.
Mr. Chenguang Hou
Chairman and Chief Executive Officer
Hong Kong, 14 August 2026
As of the date of this announcement, the Board of Directors of the Company comprises of Mr. Chenguang
Hou, Mr. Yuanhui Fu, and Ms. Na, Tian as Executive Directors, Mr. Wanming Wang as Non-Executive
Director, and Mr. Ying Bin Ian He, Mr. Wei Shao, Mr. Bielin Shi, and Ms. Ruixia (Rane) Han as
Independent Non-executive Directors.
- 54 -
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock code: 2099) (Toronto Stock code: CGG)
Overseas Regulatory Announcement VANCOUVER, June 30, 2026 – China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) announces the results of its annual general and special meeting of shareholders held on June 29, 2026 (Vancouver time). Please see the attached announcement for more details.
By order of the Board China Gold International Resources Corp. Ltd. Mr. Chenguang Hou Chairman and Chief Executive Officer Hong Kong, June 30, 2026 As at the date of this announcement, the Board of Directors of the Company comprises Mr. Chenguang Hou, Mr. Yuanhui Fu, and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non‐executive Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Mr. Bielin Shi, and Ms. Ruixia (Rane) Han as Independent Non‐executive Directors.
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
China Gold International Resources Reports Results of its Annual General and Special Meeting of Shareholders China Gold International Resources Corp. Ltd. (TSX: CGG; HKEx: 2099) (the “Company” or “China Gold International Resources”) announces the results of its annual general and special meeting of shareholders (the “AGM” or “Meeting”) held on June 29, 2026 (Vancouver time). A total of 310,389,028 common shares, representing 78.30% of the issued and outstanding common shares of the Company, were present in person or by proxy at the Meeting. The detailed results are presented below: No.
Resolutions
To approve, by ordinary resolution, setting the number of Directors at eight (8). Election of Directors
% of Votes Cast For (rounded)
Number of Votes For
Against
Total
304,280,354
31,481
304,311,835
For
Withheld
Total
99.99%
CHENGUANG HOU
295,089,768
14,595,707
309,685,475
95.29%
YUANHUI FU
294,104,435
15,581,040
309,685,475
94.97%
NA TIAN
295,341,835
14,343,640
309,685,475
95.37%
WANMING WANG
294,458,681
15,226,794
309,685,475
95.08%
YINGBIN IAN HE
301,212,685
8,472,790
309,685,475
97.26%
WEI SHAO
307,007,346
2,678,129
309,685,475
99.14%
BIELIN SHI
303,155,085
6,530,390
309,685,475
97.89%
RUIXIA HAN
308,099,893
1,585,582
309,685,475
99.49%
For
Withheld
Total
304,458,871
5,930,157
310,389,028
To appoint BDO Limited and Lixin & Ethos CPAs LLP as auditors of the Company at a remuneration to be fixed by the board of directors.
98.09%
China Gold International Resources Corp. Ltd.
To grant to the board of directors a general mandate to allot, issue and otherwise deal with unissued shares and/or sell or transfer treasury shares of the Company ( “ Treasury Shares ” ) not exceeding 20% of the aggregate number of issued shares of the Company (excluding Treasury Shares) as at the date of the passing of this resolution and the said approval shall be limited accordingly.
To grant to the board of directors a general mandate to repurchase shares not exceeding 10% of the aggregate number of issued shares of the Company (excluding Treasury Shares) as at the date of the passing of this resolution and the said approval shall be limited accordingly.
To extend the general mandate to allot, issue and otherwise deal with unissued shares and/or sell or transfer Treasury Shares by the addition thereto of the shares repurchased by the Company.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
For
Against
Total
235,333,816
74,351,659
309,685,475
For
Against
Total
293,968,156
15,717,319
309,685,475
For
Against
Total
236,401,697
73,283,778
309,685,475
75.99%
94.92%
76.34%
China Gold International Resources Corp. Ltd.
To vote on an ordinary resolution of the independent shareholders of the Company approving the 2nd Supplemental Financial Service Agreement, and the Revised 2026 Deposit Cap and the 2026-2029 Deposit Cap thereunder.
To vote on an ordinary resolution of the independent shareholders of the Company approving the 5th Supplemental Contract for Purchase and Sale of Doré and 2027-2029 Gold Doré Annual Caps thereunder.
To vote on an ordinary resolution of the independent shareholders of the Company approving the 5th Supplemental Products and Services Framework Agreement, and the 2027-2029 P&S Annual Caps thereunder.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
WITHDRAWN Note 1
For
Against
Total
130,257,573
21,074,872
151,332,445
For
Against
Total
130,255,656
21,076,789
151,332,445
86.07%
86.07%
Note 1: In response to development subsequent to the issuance of the Circular and feedback received from Shareholders, the Company did not submit Resolution no.7 for consideration and approval at the Meeting. Note 2: The table above only provides a summary of the Resolutions. The full text of these Resolutions is set out in the Notice.
There were no repurchased Shares pending cancellation or treasury shares held by the Company (including Treasury Shares held or deposited with the Central Clearing and Settlement System) as at the date of the AGM.
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
About China Gold International Resources China Gold International Resources is a gold and base metal mining company incorporated in BC, Canada and operates two mines, the CSH Gold Mine in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine in Tibet, China. The Company’s objective is to build shareholder value through growing production at its current mining operations, expanding its resource base, and acquiring and developing new projects internationally. The Company is listed on the Toronto Stock Exchange (TSX: CGG) and the Main Board of The Stock Exchange of Hong Kong Limited (HKEx: 2099).
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock code: 2099) (Toronto Stock code: CGG)
Overseas Regulatory Announcement VANCOUVER, June 30, 2026 – China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) announces the results of its annual general and special meeting of shareholders held on June 29, 2026 (Vancouver time). Please see the attached announcement for more details.
By order of the Board China Gold International Resources Corp. Ltd. Mr. Chenguang Hou Chairman and Chief Executive Officer Hong Kong, June 30, 2026 As at the date of this announcement, the Board of Directors of the Company comprises Mr. Chenguang Hou, Mr. Yuanhui Fu, and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non‐executive Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Mr. Bielin Shi, and Ms. Ruixia (Rane) Han as Independent Non‐executive Directors.
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
China Gold International Resources Reports Results of its Annual General and Special Meeting of Shareholders China Gold International Resources Corp. Ltd. (TSX: CGG; HKEx: 2099) (the “Company” or “China Gold International Resources”) announces the results of its annual general and special meeting of shareholders (the “AGM” or “Meeting”) held on June 29, 2026 (Vancouver time). A total of 310,389,028 common shares, representing 78.30% of the issued and outstanding common shares of the Company, were present in person or by proxy at the Meeting. The detailed results are presented below: No.
Resolutions
To approve, by ordinary resolution, setting the number of Directors at eight (8). Election of Directors
% of Votes Cast For (rounded)
Number of Votes For
Against
Total
304,280,354
31,481
304,311,835
For
Withheld
Total
99.99%
CHENGUANG HOU
295,089,768
14,595,707
309,685,475
95.29%
YUANHUI FU
294,104,435
15,581,040
309,685,475
94.97%
NA TIAN
295,341,835
14,343,640
309,685,475
95.37%
WANMING WANG
294,458,681
15,226,794
309,685,475
95.08%
YINGBIN IAN HE
301,212,685
8,472,790
309,685,475
97.26%
WEI SHAO
307,007,346
2,678,129
309,685,475
99.14%
BIELIN SHI
303,155,085
6,530,390
309,685,475
97.89%
RUIXIA HAN
308,099,893
1,585,582
309,685,475
99.49%
For
Withheld
Total
304,458,871
5,930,157
310,389,028
To appoint BDO Limited and Lixin & Ethos CPAs LLP as auditors of the Company at a remuneration to be fixed by the board of directors.
98.09%
China Gold International Resources Corp. Ltd.
To grant to the board of directors a general mandate to allot, issue and otherwise deal with unissued shares and/or sell or transfer treasury shares of the Company ( “ Treasury Shares ” ) not exceeding 20% of the aggregate number of issued shares of the Company (excluding Treasury Shares) as at the date of the passing of this resolution and the said approval shall be limited accordingly.
To grant to the board of directors a general mandate to repurchase shares not exceeding 10% of the aggregate number of issued shares of the Company (excluding Treasury Shares) as at the date of the passing of this resolution and the said approval shall be limited accordingly.
To extend the general mandate to allot, issue and otherwise deal with unissued shares and/or sell or transfer Treasury Shares by the addition thereto of the shares repurchased by the Company.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
For
Against
Total
235,333,816
74,351,659
309,685,475
For
Against
Total
293,968,156
15,717,319
309,685,475
For
Against
Total
236,401,697
73,283,778
309,685,475
75.99%
94.92%
76.34%
China Gold International Resources Corp. Ltd.
To vote on an ordinary resolution of the independent shareholders of the Company approving the 2nd Supplemental Financial Service Agreement, and the Revised 2026 Deposit Cap and the 2026-2029 Deposit Cap thereunder.
To vote on an ordinary resolution of the independent shareholders of the Company approving the 5th Supplemental Contract for Purchase and Sale of Doré and 2027-2029 Gold Doré Annual Caps thereunder.
To vote on an ordinary resolution of the independent shareholders of the Company approving the 5th Supplemental Products and Services Framework Agreement, and the 2027-2029 P&S Annual Caps thereunder.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
WITHDRAWN Note 1
For
Against
Total
130,257,573
21,074,872
151,332,445
For
Against
Total
130,255,656
21,076,789
151,332,445
86.07%
86.07%
Note 1: In response to development subsequent to the issuance of the Circular and feedback received from Shareholders, the Company did not submit Resolution no.7 for consideration and approval at the Meeting. Note 2: The table above only provides a summary of the Resolutions. The full text of these Resolutions is set out in the Notice.
There were no repurchased Shares pending cancellation or treasury shares held by the Company (including Treasury Shares held or deposited with the Central Clearing and Settlement System) as at the date of the AGM.
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
About China Gold International Resources China Gold International Resources is a gold and base metal mining company incorporated in BC, Canada and operates two mines, the CSH Gold Mine in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine in Tibet, China. The Company’s objective is to build shareholder value through growing production at its current mining operations, expanding its resource base, and acquiring and developing new projects internationally. The Company is listed on the Toronto Stock Exchange (TSX: CGG) and the Main Board of The Stock Exchange of Hong Kong Limited (HKEx: 2099).
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
Overseas Regulatory Announcement VANCOUVER, June 16, 2026 – China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) (“China Gold International Resources” or the “Company”) files and mails annual and special meeting materials. Please see the attached announcement for details.
By order of the Board China Gold International Resources Corp. Ltd. Mr. Chenguang Hou Chairman and Chief Executive Officer
Hong Kong, June 17, 2026 As at the date of this announcement, the Board of Directors of the Company comprises Mr. Chenguang Hou, Mr. Yuanhui Fu, and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non-executive Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Mr. Bielin Shi, and Ms. Ruixia (Rane) Han as Independent Non-executive Directors.
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. FILES AND MAILS ANNUAL AND SPECIAL MEETING MATERIALS
Your vote is important – vote today. The Board of Directors unanimously recommends that Shareholders vote FOR on ALL proposed resolutions at the Annual and Special Meeting. Shareholder questions or need voting assistance? Contact Laurel Hill Advisory Group (“Laurel Hill”) or contact Financial PR (Hong Kong) Limited (“FPR”).
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
Overseas Regulatory Announcement VANCOUVER, June 16, 2026 – China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) (“China Gold International Resources” or the “Company”) files and mails annual and special meeting materials. Please see the attached announcement for details.
By order of the Board China Gold International Resources Corp. Ltd. Mr. Chenguang Hou Chairman and Chief Executive Officer
Hong Kong, June 17, 2026 As at the date of this announcement, the Board of Directors of the Company comprises Mr. Chenguang Hou, Mr. Yuanhui Fu, and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non-executive Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Mr. Bielin Shi, and Ms. Ruixia (Rane) Han as Independent Non-executive Directors.
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. FILES AND MAILS ANNUAL AND SPECIAL MEETING MATERIALS
Your vote is important – vote today. The Board of Directors unanimously recommends that Shareholders vote FOR on ALL proposed resolutions at the Annual and Special Meeting. Shareholder questions or need voting assistance? Contact Laurel Hill Advisory Group (“Laurel Hill”) or contact Financial PR (Hong Kong) Limited (“FPR”).
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
Overseas Regulatory Announcement VANCOUVER, May 14, 2026 – China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) (“China Gold International Resources” or the “Company”) reports financial and operational results for the three months ended March 31, 2026. Please see the attached announcement for details.
By order of the Board China Gold International Resources Corp. Ltd. Mr. Chenguang Hou Chairman and Chief Executive Officer
Hong Kong, May 15, 2026 As at the date of this announcement, the Board of Directors of the Company comprises Mr. Chenguang Hou, Mr. Yuanhui Fu, and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non-executive Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Mr. Bielin Shi, and Ms. Ruixia (Rane) Han as Independent Non-executive Directors.
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
China Gold International Resources Reports 2026 First Quarter Results —— Record High Quarterly Net Profit Exceeds USD 200 Million for the First Time VANCOUVER, May 14, 2026 – China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) (“China Gold International Resources” or the “Company”) reports financial and operational results for the three months ended March 31, 2026(“Q1”, “first quarter” or “first quarter of 2026”). This news release should be read in conjunction with the Company’s Financial Statements, Notes to the Financial Statements and Management’s Discussion and Analysis.(“MD&A”). For detailed information, please read the Company’s Financial Statements and MD&A which are available on SEDAR’s website at www.sedar.com, The Stock Exchange of Hong Kong Limited’s website at www.hkex.com.hk, the Company's website at www.chinagoldintl.com, or call the Company at +1-604-609-0598 and email to [email protected]. 2026 FIRST QUARTER FINANCIAL, PRODUCTION AND OPERATION HIGHLIGHTS • Revenue increased by 66% to US$453.2 million from US$273.1 million for the same period in 2025. • Mine operating earnings of US$292.8 million, increased by US$175.1 million from mine operating earnings of US$117.7 million for the same period in 2025. • Net profit of US$236.4 million increased by US$150.4 million from US$86.0 million for the same period in 2025, marking the first time in the Company's history that quarterly net profit has exceeded US$200 million. • Cash flow from operation of US$268.7 million, increased from US$143.5 million for the same period in 2025. • Total gold production decreased by 22% to 34,820 ounces from 44,797 ounces for the same period in 2025. • Total copper production was 37.5 million pounds (approximately 17,030 tonnes) a slight increase from 37.3 million pounds (approximately 16,911 tonnes) for the same period in 2025. The Company's Chairman and CEO, Mr. Chenguang Hou, commented, “The Company maintained a positive growth trajectory in the first quarter, achieving a record-high quarterly net profit in its history. Benefiting from elevated metal prices and stable operations, we delivered robust revenue growth and profitability. This provides us with a solid foundation for executing our strategy for the full year. The Company will remain focused on enhancing operational efficiency and creating long-term value for our shareholders.”
Tel: +1-604-609-0598 Fax: +1-604-688-0598 E-mail: [email protected], www.chinagoldintl.com
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
About China Gold International Resources China Gold International Resources is a gold and base metal mining company incorporated in BC, Canada and operates two mines, the Chang Shan Hao Gold Mine in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine in Tibet, China. The Company’s objective is to build shareholder value through growing production at its current mining operations, expanding its resource base, and acquiring and developing new projects internationally. The Company is listed on the Toronto Stock Exchange (TSX: CGG) and the Main Board of The Stock Exchange of Hong Kong Limited (HKEX: 2099).
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
Overseas Regulatory Announcement VANCOUVER, May 14, 2026 – China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) (“China Gold International Resources” or the “Company”) reports financial and operational results for the three months ended March 31, 2026. Please see the attached announcement for details.
By order of the Board China Gold International Resources Corp. Ltd. Mr. Chenguang Hou Chairman and Chief Executive Officer
Hong Kong, May 15, 2026 As at the date of this announcement, the Board of Directors of the Company comprises Mr. Chenguang Hou, Mr. Yuanhui Fu, and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non-executive Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Mr. Bielin Shi, and Ms. Ruixia (Rane) Han as Independent Non-executive Directors.
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
China Gold International Resources Reports 2026 First Quarter Results —— Record High Quarterly Net Profit Exceeds USD 200 Million for the First Time VANCOUVER, May 14, 2026 – China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) (“China Gold International Resources” or the “Company”) reports financial and operational results for the three months ended March 31, 2026(“Q1”, “first quarter” or “first quarter of 2026”). This news release should be read in conjunction with the Company’s Financial Statements, Notes to the Financial Statements and Management’s Discussion and Analysis.(“MD&A”). For detailed information, please read the Company’s Financial Statements and MD&A which are available on SEDAR’s website at www.sedar.com, The Stock Exchange of Hong Kong Limited’s website at www.hkex.com.hk, the Company's website at www.chinagoldintl.com, or call the Company at +1-604-609-0598 and email to [email protected]. 2026 FIRST QUARTER FINANCIAL, PRODUCTION AND OPERATION HIGHLIGHTS • Revenue increased by 66% to US$453.2 million from US$273.1 million for the same period in 2025. • Mine operating earnings of US$292.8 million, increased by US$175.1 million from mine operating earnings of US$117.7 million for the same period in 2025. • Net profit of US$236.4 million increased by US$150.4 million from US$86.0 million for the same period in 2025, marking the first time in the Company's history that quarterly net profit has exceeded US$200 million. • Cash flow from operation of US$268.7 million, increased from US$143.5 million for the same period in 2025. • Total gold production decreased by 22% to 34,820 ounces from 44,797 ounces for the same period in 2025. • Total copper production was 37.5 million pounds (approximately 17,030 tonnes) a slight increase from 37.3 million pounds (approximately 16,911 tonnes) for the same period in 2025. The Company's Chairman and CEO, Mr. Chenguang Hou, commented, “The Company maintained a positive growth trajectory in the first quarter, achieving a record-high quarterly net profit in its history. Benefiting from elevated metal prices and stable operations, we delivered robust revenue growth and profitability. This provides us with a solid foundation for executing our strategy for the full year. The Company will remain focused on enhancing operational efficiency and creating long-term value for our shareholders.”
Tel: +1-604-609-0598 Fax: +1-604-688-0598 E-mail: [email protected], www.chinagoldintl.com
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
About China Gold International Resources China Gold International Resources is a gold and base metal mining company incorporated in BC, Canada and operates two mines, the Chang Shan Hao Gold Mine in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine in Tibet, China. The Company’s objective is to build shareholder value through growing production at its current mining operations, expanding its resource base, and acquiring and developing new projects internationally. The Company is listed on the Toronto Stock Exchange (TSX: CGG) and the Main Board of The Stock Exchange of Hong Kong Limited (HKEX: 2099).
China Gold International Resources Reports 2026 First Quarter Results
—— Record High Quarterly Net Profit Exceeds USD 200 Million for the First Time
VANCOUVER, May 14, 2026 – China Gold International Resources Corp. Ltd. (TSX:
CGG; HKEX: 2099) (“China Gold International Resources” or the “Company”) reports
financial and operational results for the three months ended March 31, 2026(“Q1”, “first
quarter” or “first quarter of 2026”). This news release should be read in conjunction with
the Company’s Financial Statements, Notes to the Financial Statements and
Management’s Discussion and Analysis.(“MD&A”).
For detailed information, please read the Company’s Financial Statements and MD&A
which are available on SEDAR’s website at www.sedar.com, The Stock Exchange of
Hong Kong Limited’s website at www.hkex.com.hk, the Company's website at
www.chinagoldintl.com, or call the Company at +1-604-609-0598 and email to
2026 FIRST QUARTER FINANCIAL, PRODUCTION AND OPERATION HIGHLIGHTS
• Revenue increased by 66% to US$453.2 million from US$273.1 million for the same
period in 2025.
• Mine operating earnings of US$292.8 million, increased by US$175.1 million from
mine operating earnings of US$117.7 million for the same period in 2025.
• Net profit of US$236.4 million increased by US$150.4 million from US$86.0 million
for the same period in 2025, marking the first time in the Company's history that quarterly
net profit has exceeded US$200 million.
• Cash flow from operation of US$268.7 million, increased from US$143.5 million for
the same period in 2025.
• Total gold production decreased by 22% to 34,820 ounces from 44,797 ounces for
the same period in 2025.
• Total copper production was 37.5 million pounds (approximately 17,030 tonnes) a
slight increase from 37.3 million pounds (approximately 16,911 tonnes) for the same
period in 2025.
The Company's Chairman and CEO, Mr. Chenguang Hou, commented, “The Company
maintained a positive growth trajectory in the first quarter, achieving a record-high
quarterly net profit in its history. Benefiting from elevated metal prices and stable
operations, we delivered robust revenue growth and profitability. This provides us with a
solid foundation for executing our strategy for the full year. The Company will remain
focused on enhancing operational efficiency and creating long-term value for our
shareholders.”
(a company incorporated under the laws of British Columbia, Canada with limited liability) (Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
Overseas Regulatory Announcement
VANCOUVER, May 14, 2026 – China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) (“China Gold International Resources” or the “Company”) reports financial and operational results for the three months ended March 31, 2026.
Please see the attached announcement for details.
By order of the Board China Gold International Resources Corp. Ltd. Mr. Chenguang Hou Chairman and Chief Executive Officer
Hong Kong, May 15, 2026
As at the date of this announcement, the Board of Directors of the Company comprises Mr. Chenguang Hou, Mr. Yuanhui Fu, and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non-executive Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Mr. Bielin Shi, and Ms. Ruixia (Rane) Han as Independent Non-executive Directors.
China Gold International Resources Corp. Ltd.
Tel: +1-604-609-0598 Fax: +1-604-688-0598 E-mail: [email protected], www.chinagoldintl.com Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
China Gold International Resources Reports 2026 First Quarter Results —— Record High Quarterly Net Profit Exceeds USD 200 Million for the First Time VANCOUVER, May 14, 2026 – China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) (“China Gold International Resources” or the “Company”) reports financial and operational results for the three months ended March 31, 2026(“Q1”, “first quarter” or “first quarter of 2026”). This news release should be read in conjunction with the Company’s Financial Statements, Notes to the Financial Statements and Management’s Discussion and Analysis.(“MD&A”).
For detailed information, please read the Company’s Financial Statements and MD&A which are available on SEDAR’s website at www.sedar.com, The Stock Exchange of Hong Kong Limited’s website at www.hkex.com.hk, the Company's website at www.chinagoldintl.com, or call the Company at +1-604-609-0598 and email to [email protected].
2026 FIRST QUARTER FINANCIAL, PRODUCTION AND OPERATION HIGHLIGHTS
• Revenue increased by 66% to US$453.2 million from US$273.1 million for the same
period in 2025.
• Mine operating earnings of US$292.8 million, increased by US$175.1 million from
mine operating earnings of US$117.7 million for the same period in 2025.
• Net profit of US$236.4 million increased by US$150.4 million from US$86.0 million
for the same period in 2025, marking the first time in the Company's history that quarterly
net profit has exceeded US$200 million.
• Cash flow from operation of US$268.7 million, increased from US$143.5 million for
the same period in 2025.
• Total gold production decreased by 22% to 34,820 ounces from 44,797 ounces for
the same period in 2025.
• Total copper production was 37.5 million pounds (approximately 17,030 tonnes) a
slight increase from 37.3 million pounds (approximately 16,911 tonnes) for the same
period in 2025.
The Company's Chairman and CEO, Mr. Chenguang Hou, commented, “The Company maintained a positive growth trajectory in the first quarter, achieving a record-high quarterly net profit in its history. Benefiting from elevated metal prices and stable operations, we delivered robust revenue growth and profitability. This provides us with a solid foundation for executing our strategy for the full year. The Company will remain focused on enhancing operational efficiency and creating long-term value for our shareholders.”
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
About China Gold International Resources China Gold International Resources is a gold and base metal mining company incorporated in BC, Canada and operates two mines, the Chang Shan Hao Gold Mine in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine in Tibet, China. The Company’s objective is to build shareholder value through growing production at its current mining operations, expanding its resource base, and acquiring and developing new projects internationally. The Company is listed on the Toronto Stock Exchange (TSX: CGG) and the Main Board of The Stock Exchange of Hong Kong Limited (HKEX: 2099).
(a company incorporated under the laws of British Columbia, Canada with limited liability) (Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
RESULTS ANNOUNCEMENT FOR THE YEAR ENDED DECEMBER 31, 2025 FINANCIAL HIGHLIGHTS For the Year ended December 31, 2025 2024 US$’000 US$’000 Revenues Net profit Basic earnings per share (cents) Diluted earnings(loss) per share (cents)
1,310,125 472,315 117.80 N/A
756,646 65,298 15.82 N/A
Net cash flows from operations Property, plant and equipment Property, plant and equipment capital expenditures Cash and cash equivalents Working capital
709,984 1,339,447 50,136 399,402 580,005
306,896 1,375,498 48,286 183,779 326,988
RESULTS The board of directors (the“Board”) of China Gold International Resources Corp. Ltd. (the “Company” together with its subsidiaries, referred hereto as the “Group”) is pleased to announce the audited consolidated results of the Group for the year ended December 31, 2025 with comparative figures for the comparable period in 2024, as follows:
-1-
MANAGEMENT’S DISCUSSION AND ANALYSIS
The following Management Discussion and Analysis of financial condition and results of operations (“MD&A”) is prepared as of March 30, 2026. It should be read in conjunction with the consolidated financial statements and notes thereto of China Gold International Resources Corp. Ltd. (referred to herein as “China Gold International”, the “Company”, “we” or “our” as the context may require) for the three months and year ended December 31, 2025 and the three months and year ended December 31, 2024, respectively. Unless the context otherwise provides, references in this MD&A to China Gold International or the Company refer to China Gold International and each of its subsidiaries collectively on a consolidated basis. The following discussion contains certain forward-looking statements relating to the Company’s plans, objectives, expectations and intentions, which are based on the Company’s current expectations and are subject to risks, uncertainties and changes in circumstances. Readers should carefully consider all of the information set out in this MD&A, including the risks and uncertainties outlined further in the Company’s Annual Information Form (“Annual Information Form” or “AIF”) dated March 30, 2026 on SEDAR+ at www.sedarplus.ca, www.chinagoldintl.com and www.hkex.com.hk. For further information on risks and other factors that could affect the accuracy of forward-looking statements and the result of operations of the Company, please refer to the sections titled “Forward-Looking Statements” and “Risk Factors” and to discussions elsewhere within this MD&A. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks.
-2-
MANAGEMENT’S DISCUSSION AND ANALYSIS
FORWARD-LOOKING STATEMENTS Certain statements made herein, other than statements of historical fact relating to the Company, represent forward-looking information. In some cases, this forward-looking information can be identified by words or phrases such as “may”, “will”, “expect”, “anticipate”, “contemplates”, “aim”, “estimate”, “intend”, “plan”, “believe”, “potential”, “continue”, “is/are likely to”, “should” or the negative of these terms, or other similar expressions intended to identify forward-looking information. This forward-looking information includes, among other things; China Gold International’s production estimates, business strategies and capital expenditure plans; the development and expansion plans and schedules for the CSH Mine and the Jiama Mine; China Gold International’s financial condition; the regulatory environment as well as the general industry outlook; general economic trends in China; and statements respecting anticipated business activities, planned expenditures, corporate strategies, participation in projects and financing, and other statements that are not historical facts. By their nature, forward-looking information involves numerous assumptions, both general and specific, which may cause the actual results, performance or achievements of China Gold International and/or its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward–looking information. Some of the key assumptions include, among others, the absence of any material change in China Gold International’s operations or in foreign exchange rates, the prevailing price of gold, copper and other non-ferrous metal products; the absence of lowerthan-anticipated mineral recovery or other production problems; effective income and other tax rates and other assumptions underlying China Gold International’s financial performance as stated in the Company’s technical reports for its CSH Mine and Jiama Mine; China Gold International’s ability to obtain regulatory confirmations and approvals on a timely basis; continuing positive labor relations; the absence of any material adverse effects as a result of political instability, terrorism, natural disasters, pandemics such as COVID-19, litigation or arbitration and adverse changes in government regulation; the availability and accessibility of financing to China Gold International; and the performance by counterparties of the terms and conditions of all contracts to which China Gold International and its subsidiaries are a party. The forward-looking information is also based on the assumption that none of the risk factors identified in this MD&A or in the AIF that could cause actual results to differ materially from the forward-looking information actually occurs. Forward-looking information contained herein as of the date of this MD&A is based on the opinions, estimates and assumptions of management. There are a number of important risks, uncertainties and other factors that could cause actual actions, events or results to differ materially from those described as forward-looking information. China Gold International disclaims any obligation to update any forward-looking information, whether as a result of new information, estimates, opinions or assumptions, future events or results, or otherwise except to the extent required by law. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking information in this MD&A is expressly qualified by this cautionary statement. The reader is cautioned not to place undue reliance on forward-looking information.
-3-
MANAGEMENT’S DISCUSSION AND ANALYSIS
THE COMPANY Overview China Gold International is a gold and base metal mining company registered in British Columbia, Canada. The Company’s main business involves the operation, acquisition, development and exploration of gold and base metal properties. The Company’s principal mining operations are the Chang Shan Hao Gold Mine (“CSH Mine” or “CSH”), located in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine (“Jiama Mine” or “Jiama”), located in Tibet, China. China Gold International holds a 96.5% interest in the CSH Mine, while its Chinese joint venture (“CJV”) partner holds the remaining 3.5% interest. The Company owns a 100% interest in the Jiama Mine, which hosts a large scale copper-gold polymetallic deposit containing copper, gold, molybdenum, silver, lead and zinc metals. China Gold International’s common shares are listed on the Toronto Stock Exchange (“TSX”) and The Stock Exchange of Hong Kong Limited (“HKSE”) under the symbol CGG and the stock code 2099, respectively. Additional information about the Company, including the Company’s Annual Information Form, is available on SEDAR+ at sedarplus.ca as well as Hong Kong Exchange News at hkexnews.hk.
-4-
MANAGEMENT’S DISCUSSION AND ANALYSIS
Performance Highlights Three months ended December 31, 2025 •
Revenue increased by 31% to US$384.7 million from US$293.6 million for the same period in 2024.
•
Mine operating earnings of US$209.9 million, increased by US$87.7 million from mine operating earnings of US$122.2 million for the same period in 2024.
•
Net profit of US$127.7 million increased by US$59.4 million from US$68.3 million for the same period in 2024.
•
Cash flow from operation of US$140.4 million, increased from US$62.7 million for the same period in 2024.
•
Total gold production decreased by 21% to 47,875 ounces from 60,406 ounces for the same period in 2024.
•
Total copper production was 37.0 million pounds (approximately 16,756 tonnes) a decrease from 44.1 million pounds (approximately 20,020 tonnes) for the same period in 2024.
-5-
MANAGEMENT’S DISCUSSION AND ANALYSIS
Year ended December 31, 2025 •
Revenue increased by 73% to US$1,310.1 million from US$756.6 million for the same period in 2024.
•
Mine operating earnings of US$684.0 million, increased by US$497.1 million from US$186.9 million for the same period in 2024.
•
Net profit of US$472.3 million increased by US$407.0 million from US$65.3 million for the same period in 2024.
•
Cash flow from operation of US$710.0 million, increased from US$306.9 million for the same period in 2024.
•
Total gold production increased by 9% to 177,225 ounces from 162,652 ounces for the same period in 2024.
•
Total copper production was 156.3 million pounds (approximately 70,883 tonnes) a 48% increase from 105.7 million pounds (approximately 47,929 tonnes) for the same period in 2024.
Selected Annual Information* Year ended December 31 2024 2023
2022
2021
757 123 65 15.82 N/A 2,936 809
1,105 317 225 56.19 N/A 3,195 653
1,137 333 269 67.44 N/A 3,257 1,080
2025
US$ Millions except for per share Total revenue Income from operations Net profit (loss) Basic earnings (loss) per share (cents) Diluted earnings (loss) per share (cents) Total assets Total non-current liabilities *
1,310 590 472 117.80 N/A 3,357 555
Prepared under IFRS
-6-
459 32 (23) (6.43) N/A 2,835 802
MANAGEMENT’S DISCUSSION AND ANALYSIS
OUTLOOK After the repairs and reinforcements of the overflow of the Guolanggou Tailings Dam, the Government of Tibet Autonomous Region and relevant departments of the central government approved the resumption of Jiama’s operations on May 30, 2024, with a daily processing capacity of 34,000 tonnes, which is lower than the design processing capacity. The Company is actively advancing the construction of the Phase III tailings pond, which is expected to be completed and put into operation in the first half of 2027. The total daily processing capacity is anticipated to increase to 44,000 tpd once the Phase III tailings pond is in operation. The open-pit operations at the CSH gold mine are nearing the end of its mine life. With the CSH pit’s increased depth, the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. Ensuring slope stability and avoiding systematic risks at this stage are the Company’s top priority to ensure safe and sustainable production. Inconsideration of the events, the Company reports separate production guidance for the two mines in 2026.
CSH Mine: •
The total gold production is estimated between 70,732 ounces (2.2 tonnes) and 83,592 ounces (2.6 tonnes).
Jiama Mine: •
The copper production will be approximately between 140 million pounds (63,500 tonnes) and 149 million pounds (67,500 tonnes);
•
The gold production will be approximately between 70,732 ounces (2.2 tonnes) and 75,554 ounces (2.35 tonnes);
•
The silver production will be approximately between 4.18 million ounces (130 tonnes) and 4.82 million ounces (150 tonnes);.
-7-
MANAGEMENT’S DISCUSSION AND ANALYSIS
Outline of the Long-Term Development Plan for the Jiama Mine In 2024, the Company successfully restored stable operation at the Jiama Mine. In addition, the Company continued to focus its efforts on optimizing resource utilization plan, integrating the identified high-grade underground resources, and accelerating the exploration work at high potential zones. The long-term development plan for the Jiama Mine consists of three phases: •
Prior to the completion of the construction of the new tailings storage facility (the “Youlongbu tailings storage facility”), the Jiama Mine Phase II processing plant will maintain and operate at its current processing capacity of 34,000 tons per day to match the Guolanggou’s storage capacity (the operation of Phase I processing plant has been suspended since May 2024).
•
The Youlongbu tailings storage facility is scheduled to commence operation in 2027, allowing a further increase in the Jiama Mine’s production capacity. Over the next two years, as part of the underground resource integration plan, the Company plans to apply to increase the permitted capacity on its mining license for the Jiama Mine, subject to compliance with the relevant safety requirements. Currently, the permitted capacity on the mining license of the Jiama Mine is 14.4 million tonnes per year (approximately 44,000 tonnes per day based on 330 operating days per year). Subject to the government approval of an increased annual mining rate, and following the commissioning of Youlongbu tailings storage facility, the Jiama Mine’s ore processing volume will return to the level of 50,000 tonnes per day, in line with the designed processing capacity of the processing plants. In addition, endeavors are underway so that the production levels at the Jiama Mine will restore to those before the Guolanggou tailings overflow through blending of high-grade underground ores.
•
The Company is also working to delineate new resources at satellite deposits near the Jiama Mine. The Company has been actively conducting geological exploration work in two areas: the Bayi Ranch and the Zegulang North, both of which have shown significant resource potential. The Company will provide an update on the exploration progress and results in due course. Subject to the final exploration outcomes and feasibility studies on resource development, the Company will formulate a comprehensive expansion plan for the Jiama Mine area. This study has already been initiated at a preliminary stage.
-8-
MANAGEMENT’S DISCUSSION AND ANALYSIS
RESULTS OF OPERATIONS Selected Quarterly Financial Data Quarter ended (US$ in thousands except per share)
31-Dec
2025 30-Sep
Revenue Cost of sales Mine operating earnings (loss) General and administrative expenses Exploration and evaluation expenditures Research and development expenses Income (loss) from operations Foreign exchange gain (loss) Finance costs Profit (loss) before income tax Income tax expense (credit) Net profit (loss) Basic earnings (loss) per share (cents) Diluted earnings per share (cents)
384,734 174,826 209,908 21,450 268 16,399 171,791 7,381 4,511 171,694 43.994 127,699 31.67 N/A
345,026 147,993 197,033 14,184 224 7,848 174,777 (3,039) 4,711 153,450 11,156 142,294 35.60 N/A
30-Jun
31-Mar
307,269 147,872 159,397 12,068 133 5,256 141,940 (2,037) 4,580 139,252 22,909 116,343 29.08 N/A
273,096 155,444 117,653 12,232 508 3,296 101,617 (2,654) 5,002 95,770 9,791 85,979 21.45 N/A
31-Dec
2024 30-Sep
30-Jun
31-Mar
293,567 171,413 122,154 17,877 247 8,118 95,912 (4,631) 5,313 85,540 17,223 68,317 16.97 N/A
254,581 207,762 46,819 9,944 49 4,704 32,122 2,670 5,692 30,166 2,293 27,873 6.84 N/A
147,955 118,512 29,443 10,649 50 2,113 16,631 (443) 5,722 3,924 8,768 (4,844) (1.36) N/A
60,543 72,039 (11,496) 9,096 92 787 (21,471) (157) 5,663 (26,410) (362) (26,048) (6.63) N/A
Selected Quarterly and Annual Production Data and Analysis CSH Mine
Three months ended December 31, 2025 2024 98.21 4,124 28,684 23,814 1,747 1,521
Gold sales (US$ million) Realized average price (US$) of gold per ounce Gold produced (ounces) Gold sold (ounces) Total production cost (US$ per ounce) Cash production cost(1) (US$ per ounce) (1)
78.80 2,659 36,719 29,641 1,721 1,306
Year ended December 31, 2025 2024 338.47 3,419 96,816 99,010 1,665 1,263
246.95 2,453 108,188 100,682 1,645 1,064
Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A
Gold production at the CSH Mine decreased by 22% to 28,684 ounces for the three months ended December 31, 2025 compared to 36,719 ounces for the same period in 2024. The total production cost of gold for the three months ended December 31, 2025 increased to US$1,747 per ounce compared to US$1,721 for the same period in 2024. The cash production cost of gold for the three months ended December 31, 2025 increased to US$1,521 per ounce from US$1,306 for the same period in 2024. The increase in Cash production cost is mainly due to the increase in environment protection fees.
-9-
MANAGEMENT’S DISCUSSION AND ANALYSIS
Jiama Mine
Copper sales (US$ in millions) Realized average price1 (US$) of copper per pound after smelting fee discount Copper produced (tonnes) Copper produced (pounds) Copper sold (tonnes) Copper sold (pounds) Gold produced (ounces) Gold sold (ounces) Silver produced (ounces) Silver sold (ounces) Lead produced (tonnes) Lead produced (pounds) Lead sold (tonnes) Lead sold (pounds) Zinc produced (tonnes) Zinc produced (pounds) Zinc sold (tonnes) Zinc sold (pounds) Moly produced (tonnes) Moly produced (pounds) Moly sold (tonnes) Moly sold (pounds) Total production cost2 (US$) of copper per pound Total production cost2 (US$) of copper per pound after by-products credits4 Cash production cost4 (US$) per pound of copper Cash production cost3 (US$) of copper per pound after by-products credits4 1
Three months ended December 31, 2025 2024
Year ended December 31, 2025 2024
148.99
106.16
495.56
283.22
3.80 16,756 36,939,257 17,652 38,917,010 19,191 20,195 1,275,143 1,346,956 7,973 17,577,968 8,451 18,632,143 5,248 11,569,321 5,536 12,205,513 138 303,944 134 295,027 4.36
2.42 20,020 44,135,873 19,931 43,940,061 23,688 23,520 1,479,708 1,473,027 13,503 29,768,128 13,360 29,453,697 6,575 14,495,121 6,479 14,282,878 120 264,753 234 515,217 3.31
3.17 70,883 156,269,659 70,959 156,437,873 80,409 80,406 5,645,915 5,648,631 40,912 90,196,257 41,036 90,468,423 23,446 51,688,429 23,556 51,932,904 768 1,692,167 840 1,851,486 3.52
2.71 47,929 105,664,184 47,421 104,545,457 54,464 53,963 3,231,408 3,193,073 27,896 61,500,340 27,493 60,612,685 14,663 32,326,595 14,442 31,839,913 354 780,704 234 515,217 4.44
0.88 3.63
0.89 2.65
0.52 2.74
2.32 3.62
0.14
0.23
(0.26)
1.50
A discount factor of 11.9% to 25.3% is applied to the copper benchmark price to compensate the refinery costs incurred by the buyers. The discount factor is higher if the grade of copper in copper concentrate is below 18%. The industry standard of copper in copper concentrate is between 18-20%.
2
Production costs include expenditures incurred at the mine sites for the activities related to production including mining, processing, mine site G&A and royalties etc.
3
Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A
4
By-products credit refers to the sales of gold, silver, lead, zinc and moly during the corresponding period.
5
Increased production of by-products combined with reduced G&A and R&D costs, has resulted in by-product credits exceeding total production cost of copper.
- 10 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
During the three months ended December 31, 2025, The Jiama Mine produced 16,756 tonnes (approximately 37.0 million pounds) of copper, which decreased from of 20,020 tonnes (approximately 44.1 million pounds) during the comparative three month period in 2024. Total production cost of copper per pound increased by 32% due to lower copper grade and increase of R&D in the three months of 2025 as compared to the same period in 2024. Cash production cost of copper per pound increased as compared to the same quarter in 2024. However, total production cost of copper per pound after by-products and cash production cost of copper per pound after by-product decreased in 2025 as compared to the same three month period in 2024, mainly due to higher by-product revenue from gold and silver.
Review of Quarterly and Annual Data Three months ended December 31, 2025 compared to three months ended December 31, 2024 Revenue of US$384.7 million for the fourth quarter of 2025, increased by US$91.1 million from US$293.6 million for the same period in 2024. Revenue from the CSH Mine was US$98.2 million, an increase of US$19.4 million from US$78.8 million for the same period in 2024. The realized average gold price increased by 55%, from US$2,659/oz in Q4 2024 to US$4,124/oz in Q4 2025. Gold sold by the CSH Mine was 23,814 ounces (gold produced: 28,684 ounces), compared to 29,641 ounces (gold produced: 36,719 ounces) for the same period in 2024. Revenue from the Jiama Mine was US$286.5 million, an increase of US$71.7 million, compared to US$214.8 million for the same period in 2024. The realized average price of copper increased by 57%, from US$2.42/pound in Q4 2024 to US$3.80/pound in Q4 2025. Total copper sold was 17,652 tonnes (38.9 million pounds) for the three months ended December 31, 2025, a decrease of 11% from 19,931 tonnes (43.9 million pounds) for the same period in 2024. Cost of sales of US$174.8 million for the quarter ended December 31, 2025, a slightly increase of US$3.4 million from US$171.4 million for the same period in 2024. Cost of sales as a percentage of revenue for the Company decreased from 58% to 45% for the three months ended December 31, 2024 and 2025, respectively. Cost of sales was impacted by many operation factors such as grade of ore, recovery rates and stripping ratio. Refer to the sections below for details of production factors for each individual mine. Mine operating earnings of US$209.9 million for the three months ended December 31, 2025, an increase of US$87.7 million from US$122.2 million for the same period in 2024. General and administrative expenses increased by US$3.5 million, from US$17.9 million for the quarter ended December 31, 2024 to US$21.4 million for the quarter ended December 31, 2025, partially due to higher taxes and surcharges resulting from increased revenue in the current quarter. Research and development expenses of US$16.4 million for the three months ended December 31, 2025, increased from US$8.1 million for the comparative 2024 period. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes. Income from operations of US$171.8 million for the fourth quarter of 2025, increased by US$75.9 million, compared to US$95.9 million for the same period in 2024. Foreign exchange gain of US$7.4 million for the three months ended December 31, 2025, increased from a loss of US$4.6 million for the same period in 2024. The gain was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB.
- 11 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Interest and other income of US$2.4 million for the three months ended December 31, 2025, increased from a negative US$0.1 million for the same period in 2024, primarily due to higher interest income earned during the current quarter compared to the corresponding period last year. Finance costs of US$4.5 million for the three months ended December 31, 2025, decreased by US$0.8 million compared to US$5.3 million for the same period in 2024. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Other expense of US$5.3 million for the three months ended December 31, 2025, increased from US$0.3 million for the same period in 2024. During the current quarter, the Company recognized an impairment loss of U$5.9 million on other non-current assets based on a third-party real estate valuation report, partially offset by lower expenses in other categories. Refer to Note 22 Other non-current assets of the consolidated financial statements for details. Income tax expense of US$44.0 million for the three months ended December 31, 2025, increased by US$26.8 million from US$17.2 million for the comparative period in 2024. In December 2025, the Company accrued US$23.5 million in withholding tax on declared dividends to shareholders. During the current quarter, the Company had US$25.0 million of deferred tax expense compared to US$9.1 million deferred tax credit for the same period in 2024. Net income of US$127.7 million for the three months ended December 31, 2025, increased by US$59.4 million from US$68.3 million for the three months ended December 31, 2024.
Year ended December 31, 2025 compared to year ended December 31, 2024 Revenue of US$1,310.1 million for the year ended December 31, 2025, increased by US$553.5 million from US$756.6 million for the same period in 2024. Revenue from the CSH Mine was US$338.5 million, an increase of US$91.6 million from US$246.9 million for the same period in 2024. The realized average gold price increased by 39%, from US$2,453/oz in 2024 to US$3,419/oz in the same period of 2025. Gold sold by the CSH Mine was 99,010 ounces (gold produced: 96,816 ounces), compared to 100,682 ounces (gold produced: 108,188 ounces) for the same period in 2024. Revenue from the Jiama Mine was US$971.7 million, an increase of US$462.0 million, compared to US$509.7 million for the same period in 2024. The realized average price of copper increased by 17%, from US$2.71/pound in 2024 to US$3.17/pound in the same period of 2025. Total copper sold was 70,959 tonnes (156.4 million pounds) for the year ended December 31, 2025, an increase of 50% from 47,421 tonnes (104.5 million pounds) for the same period in 2024. Cost of sales of US$626.1 million for the year ended December 31, 2025, an increase of US$56.4 million from US$569.7 million for the same period in 2024. The cost of sales increased due to the resumption of operations at the Jiama Mine, leading to higher production costs as the Phase II processing plants was reactivated. Mine operating earnings of US$684.0 million for the year ended December 31, 2025, an increase of US$497.1 million from US$186.9 million for the same period in 2024. General and administrative expenses increased by US$12.3 million, from US$47.6 million for the year ended December 31, 2024 to US$59.9 million for the same period in 2025, primarily driven by higher operational support costs associated with the resumption of production at the Jiama Mine. Research and development expenses of US$32.8 million for the year ended December 31, 2025, increased from US$15.7 million for the comparative 2024 period. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes.
- 12 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Income from operations of US$590.1 million for the year ended December 31, 2025, increased by US$466.9 million, compared to US$123.2 million for the same period in 2024. Foreign exchange loss of US$0.3 million for the year ended December 31, 2025, decreased from US$2.6 million for the same period in 2024. The loss was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB. Interest and other income of US$11.7 million for the year ended December 31, 2025, increased from US$5.1 million for the same period in 2024, primarily due to higher interest income earned during the current period and higher dividend received from China Nonferrous Mining Corporation Limited compared to the corresponding period last year. Finance costs of US$18.8 million for the year ended December 31, 2025, decreased by US$3.6 million compared to US$22.4 million for the same period in 2024. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Other expense of US$22.5 million for the year ended December 31, 2025, increased from US$10.1 million for the same period in 2024. During the current period, the Company recognized litigation compensation of US$15.0 million arising from the litigation between Shaanxi Xiaoshanchuan Mineral Resources Development and Construction Co.,Ltd. and the Company’s subsidiary, Tibet Huatailong Mining Development Co. Ltd. Refer to Note 31 Contingencies of the consolidated financial statements for details. Income tax expense of US$87.9 million for the year ended December 31, 2025, increased by US$60.0 million from US$27.9 million for the comparative period in 2024. In December 2025, the Company accrued US$23.5 million in withholding tax on declared dividends to shareholders. During the current period, the Company had US$23.7 million of deferred tax expense compared to a deferred tax expense of US$10.3 million for the same period in 2024. Net income of US$472.3 million for the year ended December 31, 2025, increased by US$407.0 million from US$65.3 million for the same period in 2024.
NON-IFRS MEASURES The cash cost of production, cash cost after by-product credits and cash cost per ounce and per pound are measures that are not in accordance with IFRS. The Company has included these metrics to supplement its consolidated financial statements, which are presented in accordance with IFRS. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance, operating results or financial condition prepared in accordance with IFRS. The Company has included cash production cost per ounce and per pound data because it understands that certain investors use this information to determine the Company’s ability to generate earnings and cash flow. The measures are not necessarily indicative of operating results, cash flow from operations, or financial condition as determined under IFRS. The following tables provide a reconciliation of cost of sales to the cash costs of production in total dollars and in dollars per gold ounce for the CSH Mine or per copper pound for the Jiama Mine:
- 13 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Cash production cost for gold is calculated as total cost of sales adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of gold per ounce is calculated as total cash production cost divided by total gold sold (ounces). CSH Mine (Gold) Three months ended December 31, Year ended December 31, 2025 2024 2025 2024 US$ Per US$ Per US$ Per US$ ounce US$ ounce US$ ounce US$ Total Cost of sales 1 Adjustment – Depreciation & depletion
41,593,138 (5,304,923)
1,747 51,018,707 (223) (12,164,347)
Adjustment – Amortization of intangible assets
(56,998)
(2)
(163,015)
Total cash production costs
36,231,217
1,522
38,691,345
Total Gold sold ounces
23,814
1,721 164,875,882 (410) (39,205,424)
(5)
(642,989)
1,665 165,574,005 (396) (57,678,651)
(6)
US$ Per ounce 1,645 (573)
(787,919)
(8)
1,306 125,027,469
1,263 107,107,435
1,064
29,655
99,010
100,682
Cash production cost of gold US$ per ounce calculated as total cash production cost divided by total gold sold ounces. Cash Production cost for copper is calculated as production costs (total cost of sales adjusted by General and administrative expenses and Research and development expenses) adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of copper (pounds) is calculated as total cash production cost divided by total copper sold (pounds).
- 14 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Jiama Mine (Copper with by-products credits) Three months ended December 31, Year ended December 31, 2025 2024 2025 2024 US$ Per US$ Per US$ Per US$ Pound US$ Pound US$ Pound US$ Total Cost of sales
133,232,929
3.42 120,395,116
2.74 461,258,144
General and administrative expenses Research and development expenses
20,314,047 16,398,899
0.52 0.42
0.39 0.18
Total production cost
169,945,975
4.36 145,534,336
Adjustment – Depreciation & depletion Adjustment – Amortization of intangible assets
(21,924,108)
US$ Per Pound
2.95 404,152,493
3.87
0.36 0.21
43,581,877 15,722,098
0.42 0.15
3.31 549,928,732
3.52 463,456,468
4.44
(0.56) (21,527,256)
(0.49) (94,305,794)
(0.60) (66,877,508)
(0.64)
(6,454,180)
(0.17)
(7,399,660)
(0.17) (28,363,980)
(0.18) (19,117,739)
(0.18)
Total cash production costs
141,567,687
3.63 116,607,420
2.65 427,258,958
2.74 377,461,221
3.62
By-products credits
(135,694,593)
(3.49) (106,554,080)
(2.42) (469,218,504)
(3.00) (221,844,500)
(2.12)
0.14
0.23 (41,959,546)
(0.26) 155,616,721
1.50
Total cash production costs after by-products credits Total Copper sold pounds
5,873,094
17,020,625 8,118,595
10,053,340
38,917,010
43,940,061
55,871,979 32,798,609
156,437,873
104,545,457
Cash production cost of copper US$ per pound calculated as total cash production cost divided by total copper sold pounds.
MINERAL PROPERTIES The CSH Mine The CSH Mine is located in Inner Mongolia Autonomous Region of China (Inner Mongolia). The property hosts two lowgrade, near surface gold deposits, along with other mineralized prospects. The main deposit is called the Northeast Zone (the “Northeast Zone”), while the second, smaller deposit is called the Southwest Zone (the “Southwest Zone”). The CSH Mine is owned and operated by Inner Mongolia Pacific Mining Co. Limited, a Chinese Joint Venture in which the Company holds a 96.5% interest and Ningxia Nuclear Industry Geological Exploration Institution holds the remaining 3.5%. The CSH Mine is an open-pit mining operations with a designed mining and processing capacity of 60,000 tpd. In July 2019, CSH updated its mine plan based on a result of latest ultimate limit optimization, in which the production rate was reduced to 40,000 tpd with a life of mine (“LoM”) of seven years as of 2019. The run-of-mine ore is heap leached with cyanide solution to extract gold and electro-winned to produce a gold dore which is sold to refiners. In June 2020, the operation of southwest pit ended.
- 15 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
The open-pit operations at the CSH gold mine are nearing the end of its mine life. With the increase in the pit’s depth, the height and exposed area of the pit wall have increased, and the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. Ensuring slope stability and avoiding systematic risks at this stage is the Company’s top priority to ensure safe and sustainable production. The Company continues to evaluate the potential for underground operations. The major new contracts entered into during the year ended December 31, 2025:
Item No. Contract Name 1
Sales Contract for Waste Materials
2
Open-pit to Underground Engineering Design Sales Contract for Waste Materials
3
4 5
2025 Open-pit Mine Slope Remediation Project Contract Sales Contract for Waste Materials
Subject amount (US$ millions)
Counterpart Hunan Zhongxing Environmental Protection Technology Co., Ltd China ENFI Engineering Technology Co., Ltd Hunan Zhongxing Environmental Protection Technology Co., Ltd China National Gold Group Third Engineering Co., Ltd. Hunan Zhongxing Environmental Protection Technology Co., Ltd
Contract period (effective day and expiration date)
Date of Contract
10.81
2025.3.24 – 2025.4.24
2025.3.24
5.06
2025.4.24 – 2033.4.24 2025.6.10 – 2025.7.2
2025.4.24
2025.8.27 – 2026.10.31 2025.12.25 – 2026.2.24
2025.8.27
11.27
9.37 19.78
2025.6.10
2025.12.25
Production Update CSH Mine
Ore mined and placed on pad (tonnes) Average ore grade (g/t) Recoverable gold (ounces) Ending gold in process and gold dore bars (ounces) Waste rock mined (tonnes)
Three months ended December 31, 2025 2024
Year ended December 31, 2025 2024
1,834,826 0.44 17,014
1,576,243 0.41 13,187
10,299,404 0.49 95,735
9,208,842 0.58 102,866
142,894 1,493,922
146,169 2,800,938
142,894 7,011,840
146,169 10,548,732
For the three months ended December 31, 2025, the total amount of ore placed on the leach pad was 1.8 million tonnes, with total contained gold of 17,014 ounces (529 kilograms). The overall accumulative project-to-date gold recovery rate remained consistent at approximately 56.63% at the end of December 31, 2025 from 56.47% at the end of September 30, 2025. Of which, gold recovery from the phase I and phase II heap leach pads were 59.77% and 54.67% at December 31, 2025, respectively.
- 16 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Exploration The CSH Gold Mine drilled 264 meters from hole DDH9200-3, which was remaining from the 2024 drilling program. There was no other drilling program in 2025 for the CSH Mine.
Mineral Resource Update CSH Mine Mineral Resources by category, at December 31, 2025 under NI 43-101 are listed below:
Location
Mineral Resource Category
Tonnage (x1000 t)
Au (g/t)
Metal Au (t)
Au (Moz)
Remaining within the open pit limit at a cut-off grade of 0.28 g/t Au
Measured Indicated M+I Inferred
6,031 6,647 12,678 2,576
0.68 0.72 0.70 0.41
4.09 4.75 8.84 0.15
0.132 0.153 0.285 0.005
Underground at a cut-off grade of 0.30 g/t Au
Measured Indicated M+I Inferred
88,200 89,850 178,050 62,090
0.67 0.58 0.62 0.49
58.66 52.07 110.72 30.68
1.89 1.67 3.56 0.99
Note: Mineral Resources are reported in relation to a conceptual open-pit mining and underground block caving mining. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate. Raw assays have been capped. Mineral Resources include Mineral Reserves. Mineral Resources are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. Additional Mineral Resources are reported at a cut-off grade of 0.30 g/t Au for underground block caving mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce is equal to 31.1035 grams. The mineral resource estimates include Au only. CGME Consulting limited (CGME) has estimated the mineral resources of the CSH gold deposit based on a cut-off grade of 0.28 g/t Au within the optimized ultimate open-pit limit and a cut-off grade of 0.30 g/t Au below the open pit limit on April 1, 2022. The resource estimate was conducted using Ordinary Kriging, validated by Inversed Distance Squared method, and Micromine modelling software.
- 17 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
CGME considers that blocks estimated for the first estimation pass with an average anisotropic distance to samples of less than 45 m can be classified as Measured Mineral Resources, and blocks estimated for the second estimation pass with an average anisotropic distance to samples of less than 80 m can be classified as Indicated Mineral Resources, and blocks estimated for the third estimation pass with an average anisotropic distance to samples of not more than 150 m can be categorised as Inferred Mineral Resources. For those Measured and Indicated Mineral Resource blocks, CGME considers that the degree of confidence is sufficient to allow an appropriate application of technical and economic parameters to support mine planning and to allow evaluation of the economic viability of the deposit, which is also adequate to support the open pit mining operations. In CGME’s opinion, the upper portions of gold mineralization at the CSH Gold Project are amenable to extraction by open pit mining with a cut-off grade optimised of 0.28 g/t Au, and the block caving mining operation would be the choice for extraction below the optimized open pit limits with a cut-off grade of 0.30 g/t Au in this estimation based on a Reasonable Prospect for Eventual Economic Extraction (“RPEEE”). It is noted that the partial mineral resources outside of the open pit limit but above the bottom plane may not be amenable to extraction in the future. Meanwhile, the mineral resources located below 840 m ASL at NE zone and 1,250 m ASL at SW zone may not be amendable to extraction in the future due to either excessive depth or high dilution. These mineral resources that may not be amendable to extraction in the future are excluded from the Mineral Resource Statement in this Report. Block model quantity and grade estimates for the CSH gold deposit were classified according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Yuan Chen, MSc., MAIG (M4014)/RPGeo (10262) (April 2022), an independent Qualified Person for the purposes of National Instrument 43-101 and updated by Mr. Yingting Guo, MMSA., PGeo., an independent Qualified Person for the purposes of National Instrument 43-101 on December 31, 2025.
Mineral Reserves Update CSH Mine Mineral Reserves by category at December 31, 2025 under NI 43-101 are summarized below:
Type
Metal Au t
T (x 1,000)
Diluted Au g/t
Au Moz
Proven Probable
6,405 7,222
0.64 0.67
4.11 4.87
0.13 0.16
Total
13,627
0.66
8.98
0.29
Note: Mineral Reserves are reported based on the optimized ultimate open pit limit. All figures are rounded to reflect the relative accuracy of the estimate. Mineral Reserves are included in Mineral Resources. Mineral Reserves are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,568 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce is equal to 31.1035 grams. The Proven Mineral Reserves are 6.41 Mt at a grade of 0.64 g/t Au for the gold content of 4.11 t or 0.13 Moz, and the Probable Mineral Reserves are 7.22 Mt at a grade of 0.67 g/t Au for the gold content of 4.87t or 0.16 Moz, totaling Mineral Reserves of 13.63 Mt at a grade of 0.66 g/t Au for the gold content of 8.98 t or 0.29 Moz. The Mineral Reserves for the CSH gold deposit were estimated according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Guangpian Zhang, AusIMM, a full time Principal Mining Engineer for CGME and a Qualified Person for the purposes of National Instrument 43-101.
- 18 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
The Jiama Mine Jiama is a large copper-gold polymetallic deposit containing copper, gold, silver, molybdenum, lead and zinc, located in the Gandise metallogenic belt in Tibet Autonomous Region of China. The Jiama Mine has both underground mining and open-pit mining operations. Phase I of the Jiama Mine commenced operation in the latter half of 2010 and reached its design capacity of 6,000 tpd in early 2011. Phase II of the Jiama Mine commenced mining operations in 2018 with 44,000 tpd design capacity. The combined mining and processing design capacity at the Jiama Mine is 50,000 tpd. The major new contracts entered into during the year ended December 31, 2025:
Item No. Contract Name 1
2 3
4 5
6
7
8 9 10 11 12
Subject Contract period amount (effective day and (US$ millions) expiration date)
Counterpart
Tibet Huatailong Mining Development Co., Ltd. Jiama China National Gold Group Construction Co., Ltd. 244.25 Copper Polymetallic Mine Youlongbu Tailings Dam PC General Contracting Contract Molybdenum Concentrate Purchase and Sales Contract China National Gold Group (Shanghai) Trading Co., 50.13 Ltd. Supplementary Agreement to the “Tibet Huatailong China National Gold Group International Trading Co., 69.63 Mining Development Co., Ltd. 2022-2024 Copper Ltd. Concentrate Powder Purchase and Sales Contract Tibet Huatailong Mining Development Co., Ltd. 2025 Sichuan Haotianyu Construction Machinery Leasing 2.91 Machinery and Equipment Leasing Project Contract Co., Ltd. Tibet Huatailong Mining Development Co., Ltd. Jiama Xinjiang Nonferrous Metallurgy Design and Research 3.06 Copper Polymetallic Mine Youlongbu Tailings Dam Institute Co., Ltd. General Contracting and Supervision Project Service Contract Tibet Huatailong Mining Development Co., Ltd. Tibet Gaozheng Blasting Engineering Co., Ltd. 9.02 Blasting Engineering Construction Service Project Construction Contract Tibet Huatailong Mining Development Co., Ltd.23-26 BGRIMM Technology Group Co., Ltd. (Consortium 14.03 Sub-dam Embankment and Drainage Works of Leader), Jiangxi Copper Industry Group Construction Guolanggou Tailings Pond EPC General Contracting Co., Ltd. (Consortium Member) Project Copper Concentrates Purchase and Sales Contract China National Gold Group (Shanghai) Trading Co., 2,031.28 Ltd. Contract for Blasting Engineering Construction Services Tibet Zhongjin Xinlian Blasting Engineering Co., Ltd. 6.16 of Tibet Huatailong Mining Development Co., Ltd. Sodium Hydrosulfide Zibo Tengxiang Economic and Trade Co., Ltd. 5.12 Cement China Jinyu Gold Materials Co., Ltd. 8.03 Sodium Hydrosulfide Fengshi Chemical (Shanghai) Co., Ltd. 7.69
- 19 -
Date of Contract
2025.03 – 2027.06 2025.03
2025.05 – 2028.05 2025.05 2025.05 – 2025.06 2025.05
2025.04 – 2025.12 2025.04 2025.06 – 2027.11 2025.06
2025.06 – 2026.05 2025.06
2025.5.6- 2026.6.29 2025.5.6
2025.5.27-2028.5.27 2025.5.27 2025.6.1-2026.5.31 2025.05.30 2025.6.26-2026.6.25 2025.6.26 2025.6.30-2026.6.29 2025.6.30 2025.6.30-2026.6.29 2025.6.30
MANAGEMENT’S DISCUSSION AND ANALYSIS
Item No. Contract Name 13
Subject Contract period amount (effective day and (US$ millions) expiration date)
Counterpart
14
Copper-Lead-Zinc Mixed Concentrates Purchase and Sales Contract Cement
China National Gold Group (Shanghai) Trading Co., Ltd. Tibet Jiaofa Transportation Industry Co., Ltd.
15
Steel Balls
Baiyin Hengcheng Machinery Manufacturing Co., Ltd. 3.04
16
Steel Balls
Inner Mongolia Jinyu Fengxing Mining Wear-resistant Materials Co., Ltd.
Date of Contract
791.21
2025.7.18-2027.7.17 2025.7.18
8.01
2025.11.212026.11.20 2025.11.302026.11.29 2025.12.292026.12.28
3.30
2025.11.21 2025.11.30 2025.12.29
Production Update Jiama Mine
Ore processed (tonnes) Average copper ore grade (%) Copper recovery rate (%) Average gold grade (g/t) Gold recovery rate (%) Average silver grade (g/t) Silver recovery rate (%) Average Lead grade (%) Lead recovery rate (%) Average Zinc grade (%) Zinc recovery rate (%) Average Moly grade (%) Moly recovery rate (%)
Three months ended December 31, 2025 2024 2,871,882 0.69 85 0.28 73 20.14 69 0.77 77 0.53 73 0.028 32
- 20 -
3,095,471 0.78 82 0.32 74 21.91 68 1.16 78 0.61 72 0.03 24.97
Year ended December 31, 2025 2024 11,838,916 0.71 84 0.29 73 21.15 70 0.96 78 0.58 73 0.037 33
8,197,448 0.71 82 0.29 70 19.72 62 1.24 75 0.68 72 0.029 23.20
MANAGEMENT’S DISCUSSION AND ANALYSIS
Exploration In 2025, Jiama has carried out exploration work in the mine deep and peripheral areas of the Jiama mining area, completing a total of 1,254 cubic meters of pit exploration, 4,870 meters of underground drilling, and 25,450 meters of surface drilling. The main results have been achieved as below: 1. further controlling the main skarn orebody of the interlayered structure in the Jiama mining area, defining the skarn orebodies in the surrounding contact zone; 2. two gold mineralization zones, one zinc mineralization zone, and one molybdenum mineralization zone have been defined at Bayi Ranch prospecting area. Since the consolidation of mineral rights in Jiama area, the Jiama Mine has completed a total of 297,720 meters of drilling with 622 holes.
Mineral Resources Estimate The Mineral Resource estimate was originally independently completed by Runge Pincock Minarco (RPM) Global dated 12th November 2012. Mining One was provided with the block model and all files related to construction of the model. The information contained within this report is based on information provided to Mining One, which has been verified and, in some instances, refined by Mining One. The Resource estimate is based on three dimensional geological and mineralisation models that were informed by the drill hole data set. The Resource is based on three main geological domains that represent Skarn, Hornfels and Porphyry lithologies; mineralisation is hosted within each of these domains. Domain boundaries were constructed using a combination of the geology domains and a 0.1% Cu equivalent cut–off for the mineralisation. Standard wireframing procedures were used in relation to extrapolation of polygons half the drill spacing distance past known data points and tapering of zone thickness on the periphery of the domains. Mining One Pty Ltd. noted that gold and silver mineralization within the ore body had a significantly higher spatial variability than the other elements. This classification takes into account the proposed large scale mining techniques where Au and Ag will only be credits to the overall products from the operations. Mining One Pty Ltd has assumed that Au and Ag will not be assigned a single cut-off grade for a selected mining block and will be mined in conjunction with the other elements.
- 21 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Jiama Mine resources by category as of December 31, 2025 under NI 43-101:
Class
Quantity Mt
Cu %
Mo %
Measured Indicated M+I Inferred
90.57 1294.56 1385.13 405.18
0.38 0.40 0.40 0.31
0.04 0.03 0.03 0.03
Jiama Project – Cu, Mo, Pb, Zn, Au, and Ag Mineral Resources under NI 43-101 Reported at a 0.3% Cu Equivalent Cut off grade*, as of December 31, 2025 Cu Metal Mo Metal Pb Metal Pb % Zn % Au g/t Ag g/t (kt) (kt) (kt) 0.04 0.05 0.05 0.08
0.02 0.03 0.03 0.04
0.07 0.10 0.10 0.10
5.04 5.48 5.45 5.13
344.76 5126.91 5471.67 1256.07
33.22 445.26 478.48 121.56
33.10 605.10 638.20 324.15
Zn Metal (kt)
Au Moz
Ag Moz
16.60 375.05 391.65 174.61
0.21 4.12 4.33 1.31
14.67 227.97 242.64 66.83
Note: Figures reported are rounded which may result in small tabulation errors. The prices of Cu, Mo, Pb, Zn, Au and Ag are US$2.9/lbs; US$15.5/lbs; US$2.9/lbs; US$0.95/lbs; US$1,300/oz and $20/oz respectively. The Copper Equivalent basis for the reporting of resources has been compiled on the following basis: CuEq Grade: = (Ag Grade * Ag Price + Au Grade * Au Price + Cu Grade * Cu Price + Pb Grade * Pb Price + Zn Grade * Zn Price + Mo Grade * Mo Price)/Copper Price The Mineral Resources include the Mineral Reserves Resource Estimate by Runge Pincock Minarco on 12th November of 2012 and updated by Mining One Pty Ltd. In 2014 and by Tony Guo, P.Geo, a Qualified Person as defined by NI 43-101 in 2025.
- 22 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Mineral Reserves Estimate The selected mining strategies developed by CGDI in conjunction with China Gold consider conventional truck shovel mining for the Jiaoyan and South open pits. Various mining methods have been proposed for the Phase II Expansion Underground Mine with the primary method being Sub Level Stoping with fill (Primary/Secondary/(Tertiary)). The reserve estimate for the Jiama Project underground mine is based on a combination of Sub Level Open Stoping with Paste fill, Room and Pillar and Cut and Fill. The mineral reserve estimate is summarised below which are inclusive of the modifying factors for mining recovery and dilution. Jiama Mine reserves by category as of December 31, 2025 under NI 43-101:
Class
Quantity Mt
Cu %
Jiama Project Statement of NI 43-101 Mineral Reserve Estimate as of December 31, 2025 Cu Metal Mo Metal Pb Metal Zn Metal Mo % Pb % Zn % Au g/t Ag g/t (kt) (kt) (kt) (kt)
Proven Probable P+P
16.60 320.23 336.83
0.60 0.60 0.60
0.05 0.03 0.04
0.02 0.13 0.12
0.02 0.07 0.07
0.19 0.16 0.16
7.66 10.38 10.25
99.61 1921.37 2020.98
8.30 96.07 104.37
3.32 416.30 419.62
3.32 224.16 227.48
Au Moz
Ag Moz
0.10 1.65 1.75
4.09 106.88 111.97
Notes: 1.
All Mineral Reserves have been estimated in accordance with the JORC code and have been reconciled to CIM standards as prescribed by the NI 43-101.
Mineral Reserves were estimated using the following mining and economic factors: Open Pits: a)
5% dilution factor and 95% recovery were applied to the mining method;
b)
an overall slope angles of 43 degrees;
c)
a copper price of US$2.9/lbs;
d)
an overall processing recovery of 88 – 90% for copper.
Underground:
a)
10% dilution added to all Sub-Level Open Stoping;
b)
Stope recovery is 87% for Sub-Level Open Stoping;
c)
An overall processing recovery of 88 – 90% for copper.
The cut-off grade for Mineral Reserves has been estimated at copper equivalent grades of 0.3% Cu (NSR) for the open pits and 0.45% Cu (NSR) for the underground mine.
Mineral Reserves have been estimated by Runge Pincock Minarco on 12th November of 2012 and updated by Mining One Pty Ltd. in 2014 and by Tony Guo, MMSA(QP), a Qualified Person as defined by NI 43-101 in 2025.
- 23 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
LIQUIDITY AND CAPITAL RESOURCES The Company operates in a capital intensive industry. The Company’s liquidity requirements arise principally from the need for financing its mining and mineral processing operations, exploration activities and acquisition of exploration and mining rights. The Company’s principal sources of funds have been proceeds from borrowings from commercial banks, corporate bonds financing, equity financings, and cash generated from operations. The Company’s liquidity primarily depends on its ability to generate cash flow from its operations and to obtain external financing to meet its debt obligations as they become due, as well as the Company’s future operating and capital expenditure requirements. At December 31, 2025, the Company had an accumulated surplus of US$813.1 million, working capital of US$580.0 million and borrowings of US$533.4 million. The Company’s cash balance at December 31, 2025 was US$739.4 million, among which cash and cash equivalents was US$399.4 million, Restricted cash was US$34.2 million, term deposits was US$305.9 million. Management believes that its forecast operating cash flows are sufficient to cover the next twelve months of the Company’s operations including its planned capital expenditures and current debt repayments. The Company’s borrowings are comprised of US$217.0 million of short term debt facilities with interest rates ranging from 1.25% to 4.36% per annum arranged through various banks. In addition, on November 3, 2015, the Company entered into a Loan Facility agreement with a syndicate of banks, led by Bank of China. The lenders agreed to lend an aggregate principal amount of RMB3.98 billion, approximately US$613 million with the initial interest rate of 2.83% per annum. The proceeds from the Loan Facility are to be used for the development of the Jiama Mine. The loan is secured by the mining rights for the Jiama Mine. As of December 31, 2025 the Company has fully drawn under this Facility. The outstanding loan balance is RMB1.39 billion (approximately US$197 million), bearing an annual interest rate of 1.5% maturing on November 5, 2028. On April 29, 2020, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB1.4 billion (approximately US$197.8 million).As of December 31, 2025, the Company has fully drawn down under this facility. The outstanding loan balance is RMB824 million (approximately US$117 million), bearing an annual interest rate of 1.95%, with maturity on April 28, 2033. On August 8, 2025, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB2.1 billion (approximately US$294 million).As of December 31, 2025, the Company has drawn down RMB50 million (approximately US$7.11 million) under this facility, bearing an annual interest rate of 1.5%, with maturity on June 21, 2030. On May 31, 2023, the Company obtained a bilateral loan with an aggregate principal amount of RMB400 million (approximately US$56.5 million) from China Gold Finance Co., Ltd. at an annual interest rate of 2.05%. As of December 31, 2025, the outstanding loan balance was RMB400 million (approximately US$56.91 million).
- 24 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
On November 9, 2023, the Company obtained a bilateral loan with an aggregate principal amount of RMB100 million (approximately US$14.1 million) from China Construction Bank at an annual interest rate of 1.85%. As of December 31, 2025, the outstanding loan balance was RMB90 million (approximately US$12.8 million). On May 13, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million (approximately US$28.2 million) from Lhasa Chengguan District Sub branch of Agricultural Bank of China Co., Ltd. at an annual interest rate of 1.85% for a term of 3 years. As of December 31, 2025, the outstanding loan balance was RMB65 million (approximately US$9.2 million). On August 20, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million (approximately US$28.04 million) from China Gold Finance Co., Ltd. at an annual interest rate of 2.45% for a term of 3 years. As of December 31, 2025, the outstanding loan balance was RMB180 million (approximately US$25.61 million). On May 12, 2025, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$64 million from China Construction Bank (Asia) Corporation Limited, bearing interest at a floating rate based on Term SOFR. On June 10, 2025, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$15 million from China Everbright Bank Co., Ltd., Hong Kong Branch, bearing interest at a floating rate based on Term SOFR. The Company believes that the availability of debt financing in China at favorable rates will continue for the foreseeable future. The Company continues to review and assess its assets for impairment as part of its financial reporting processes. To date, the assessment carried out by the Company support the carrying values of the Company’s assets and no impairment has been required. However, the management of the Company continues to evaluate key assumptions on estimates and management judgements in order to determine the recoverable amount of the CSH Mine and the Jiama Mine.
- 25 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
CASH FLOWS The following table sets out selected cash flow data from the Company’s consolidated cash flow statements for the year ended December 31, 2025 and December 31, 2024. Year ended December 31, 2025 2024 US$’000 US$’000 Net cash from operating activities Net cash used in investing activities Net cash used in financing activities Net increase (decrease) in cash and cash equivalents Effect of foreign exchange rate changes on cash and cash equivalents Cash and cash equivalents, beginning of period
709,984 (246,828) (253,685) 209,471 6,152 183,779
306,896 (204,875) (16,171) 85,850 692 97,237
Cash and cash equivalents, end of period
399,402
183,779
Operating cash flow For the year ended December 31, 2025, net cash inflow from operating activities was US$710.0 million which is primarily attributable (i) profit before income tax of US$560.2 million (ii) depreciation of property, plant and equipment of US$132.0 million and (iii) decrease in restricted bank balances of US$32.5 million, partially offset by (i) income tax paid of US$47.6 million (ii) interest paid of US$15.8 million and (iii) Interest income of US$8.7 million.
Investing cash flow For the year ended December 31, 2025, the net cash outflow from investing activities was US$246.8 million which is primarily attributable to (i) placement of term deposits of US$306.6 million (ii) payment for acquisition of property, plant and equipment of US$50.1 million and (iii) payment for land use right of US$19.8 million, offset by (i) release of term deposits of US$119.0 million and (ii) interest income received of US$8.7 million.
Financing cash flow For the year ended December 31, 2025, the net cash outflow mainly from financing activities was US$253.7 million which is primarily attributable to (i) repayment of borrowings of US$306.2 million (ii) dividends paid to shareholders of the Company of US$31.7 million and (iii) dividends paid to non-controlling shareholders of US$1.2 million offset by proceeds of bank and other borrowings of US$86.0 million.
Expenditures Incurred For the year ended December 31, 2025, the Company incurred mining costs of US$61.1 million, mineral processing costs of US$104.7 million and transportation costs of US$3.4 million.
Gearing ratio Gearing ratio is defined as the ratio of consolidated total debt to consolidated total equity. As at December 31, 2025, the Company’s total debt was US$533.4 million and the total equity was US$2,337.0 million. The Company’s gearing ratio was therefore 0.23 as at December 31, 2025 compared to 0.26 as at September 30, 2025.
- 26 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
SIGNIFICANT INVESTMENTS, ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES. ASSOCIATES AND JOINT VENTURES, AND FUTURE PLAN FOR MATERIAL INVESTMENTS OF CAPITAL ASSETS Other than as disclosed elsewhere in this MD&A or in the consolidated financial statements for the year ended December 31, 2025, there were no significant investments held by the Company, nor were there any material acquisitions or disposals of subsidiaries, associates and joint ventures during the year ended December 31, 2025. Other than as disclosed in this MD&A, there was no plan authorized by the Board for other material investments or additions of capital assets at the date of this MD&A.
CHARGE ON ASSETS Other than as disclosed elsewhere in this MD&A and condensed consolidated financial statements, none of the Company’s assets were pledged as at December 31, 2025.
EXPOSURE TO FLUCTUATIONS IN EXCHANGE RATES AND RELATED HEDGES The Company is exposed to the financial risk related to the fluctuation of foreign exchange rates for the monetary assets and liabilities denominated in the currencies other than the functional currencies to which they relate. The Company has not hedged its exposure to currency fluctuation. However, the Management monitors foreign exchange exposure and will consider hedging significant foreign currency exposure should the need arise. Refer to Note 33, Financial Instruments, in the annual consolidated financial statements for the year ended December 31, 2025.
COMMITMENTS Commitments include principal payments on the Company’s bank loans and syndicated loan facility, corporate bonds, and capital commitments in respect of the future acquisition of property, plant and equipment and construction for both the CSH Mine and the Jiama Mine. The Company’s capital commitments relate primarily to the payments for purchase of equipment and machinery for both mines and payments to third-party contractors for the provision of mining and exploration engineering work and mine construction work for both mines. The Company has entered into contracts that prescribe such capital commitments; however, liabilities relating to them have not yet been incurred. Refer to Note 34, Commitments, in the annual consolidated financial statements for the year ended December 31, 2025. The following table outlines payments for commitments for the periods indicated:
Principal repayment of bank loans Entrusted loan payable
Total US$’000
Within One year US$’000
Within Two to five years US$’000
Over five years US$’000
504,985 28,454
217,004 28,454
219,171 –
68,810 –
- 27 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
In addition to the table set forth above, the Company has entered into service agreements with third-party contractors for the provision of mining and exploration engineering work and mine construction work for the CSH Mine. The fees for such work performed and to be performed each year varies depending on the amount of work performed. The Company has similar agreements with third party contractors for the Jiama Mine.
RELATED PARTY TRANSACTIONS China National Gold Group Co., Ltd. (formerly known as China National Gold Group Corporation) (“CNG”) owned 40.01 percent of the outstanding common shares of the Company as at December 31, 2024 and December 31, 2025. The Company had major related party transactions with the following companies related by way of shareholders or shareholder in common: The Company’s subsidiary, Inner Mongolia Pacific is a party to a non-exclusive contract for the purchase and sale of doré with CNG (the “Dore Sales Contract”) pursuant to which Inner Mongolia Pacific sells gold doré bars to CNG. The pricing is based on the monthly average price of gold ingot as quoted on the Shanghai Gold Exchange and the daily average price of silver as quoted on the Shanghai Huatong Platinum & Silver Exchange prevailing at the time of each relevant purchase order during the contract period. The Dore Sales Contract has been in effect since October 24, 2008 and was renewed for a new term that commenced on January 1, 2018 and expired on December 31, 2020, which renewal was approved by the Company’s shareholders on June 28, 2017. On June 16, 2020, the third Supplemental Contract for Purchase and Sale of Dore was approved by the Company’s Shareholders, commencing on January 1, 2021 and expiring on December 31, 2023. On June 29, 2023, the fourth supplemental Contract for Purchase and Sale of Dore was approved by the Company’s Shareholders, commencing on January 1, 2024 and expiring on December 31, 2026. Revenue from sales of gold doré bars to CNG was US$338.5 million for the year ended December 31, 2025 which increased from US$246.9 million for the year ended December 31, 2024. The Company is also a party to a Product and Service Framework Agreement with CNG, pursuant to which CNG provides construction, procurement and equipment financing services to the Company and also purchases the copper concentrates produced at the Jiama Mine. The quantity of copper concentrates, pricing terms and payment terms may be established from time to time by the parties with reference to the pricing principles for connected transactions set out under the Product and Service Framework Agreement. On June 28, 2017, the Supplemental Product and Service Framework Agreement was approved and extended to expire on December 31, 2020. On June 16, 2020, the third Supplemental Product and Service Framework Agreement was approved by the Company’s Shareholders, commencing on January 1, 2021 and expiring on December 31, 2023. On June 29, 2023, the fourth Supplemental Product and Service Framework Agreement was approved by the Company’s Shareholders, commencing on January 1, 2024 and expiring on December 31, 2026. For the year ended December 31, 2025, revenue from sales of copper concentrate and other products to CNG was US$964.8 million compared to US$505.1 million for the same period in 2024. For the year ended December 31, 2025, construction services of US$139.1 million were provided to the Company by subsidiaries of CNG compared to US$91.3 million for the same period in 2024.
- 28 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
In addition to the aforementioned major related party transactions, the Company also obtains additional services from related parties in its normal course of business, including a Loan Agreement and a Deposit Services Agreement entered into on March 25, 2019, December 31, 2019, December 22, 2020 and a Financial Service Agreement on May 5, 2021 among the Company and China Gold Finance. The Company and China Gold Finance entered into a 2024 Financial Service Agreement on June 6, 2024. As part of the 2024 Financial Service Agreement, China Gold Finance agreed to provide the Company with a range of financial services including (a) Deposit Services, (b) Lending Services, (c) Settlement Services and (d) Other Financial Services. On June 27, 2024, the 2024 Financial Services Agreement was approved by the Company’s Shareholders, commencing on the date of the approval by the Independent Shareholders and up to and including December 31, 2026. Refer to Note 30 of the consolidated financial statements for details of significant related party transactions during the year ended December 31, 2025.
PROPOSED TRANSACTIONS The Board of Directors has given the Company approval to conduct reviews of a number of projects that may qualify as acquisition targets through joint venture, merger and/or outright acquisitions. The Company did not have any material acquisition and disposal of subsidiaries and associated companies for the year ended December 31, 2025. The Company continues to review possible acquisition targets.
CRITICAL ACCOUNTING ESTIMATES In the process of applying the Company’s accounting policies, the Directors of the Company have identified accounting judgments and key sources of estimation uncertainty that have a significant effect on the amounts recognized in the audited annual consolidated financial statements. Key assumptions concerning the future and other key sources of estimation uncertainty at the end of each reporting period that have a risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next twelve months are described in Note 4 of the audited annual consolidated financial statements for the year ended December 31, 2025.
CHANGE IN ACCOUNTING POLICIES A summary of new and revised IFRS standards and interpretations are outlined in Note 2 of the audited annual consolidated financial statements as at December 31, 2025.
FINANCIAL INSTRUMENTS AND OTHER INSTRUMENTS The Company holds a number of financial instruments, the most significant of which are equity securities, accounts receivables, accounts payables, cash and loans. The financial instruments are recorded at either fair values or amortized amount on the balance sheet. The Company did not have any financial derivatives or outstanding hedging contracts as at December 31, 2025.
- 29 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
OFF-BALANCE SHEET ARRANGEMENTS As at December 31, 2025, the Company had not entered into any off-balance sheet arrangements.
DIVIDEND AND DIVIDEND POLICY The Company’s dividend policy is a key component of its long-term growth strategy. It aims to optimize capital allocation to drive business expansion while maintaining stable returns for shareholders. After successfully distributing special dividends for three consecutive years (2021-2023), the Company is introducing an enhanced dividend policy comprised of a base dividend supplemented by a variable component that adjusts based on financial performance and market conditions. Basic dividend: Subject to profitability in the previous financial year and after assessing the Company’s cash flow position and future capital requirements, the Company aims to distribute a basic dividend at a payout ratio of 30% of the net profit from the preceding financial year, with cash dividends paid annually. Variable Component: Subject to favorable market conditions and sufficient funds, the Company may distribute special dividends in addition to the basic dividend. Dividends may vary in amount and consistency or be discontinued at the Board of Directors’ discretion depending on variables including but not limited to operational cash flows, Company development requirements and strategies, spot metal prices, taxation, general market conditions and other factors. Subsequent to the end of the reporting period, a dividend in respect of the year ended December 31, 2025 of US$0.47 per common share, (the basic dividend of US$140,088,841, and the special dividend of US$46,696,280) in an aggregate amount of US$186,785,121, has been declared by the directors of the Company upon the approval of the board resolution dated March 30, 2026.
OUTSTANDING SHARES As of December 31, 2025 the Company had 396,413,753 common shares issued and outstanding.
DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING Management is responsible for the design of disclosure controls and procedures (“DC&P”) and the design of internal control over financial reporting (“ICFR”) to provide reasonable assurance that material information relating to the Company, including its consolidated subsidiaries, is made known to the Company’s certifying officers. The Company’s Chief Executive Officer and Chief Financial Officer have each evaluated the Company’s DC&P and ICFR as of December 31, 2025 and, in accordance with the requirements established under Canadian National Instrument 52-109 – Certification of Disclosure in Issuer’s Annual and Interim Filings, the Chief Executive Officer and Chief Financial Officer have concluded that these controls and procedures were effective as of December 31, 2025, and provide reasonable assurance that material information relating to the Company is made known to them by others within the Company and that the information required to be disclosed in reports that are filed or submitted under Canadian securities legislation are recorded, processed, summarized and reported within the time period specified in those rules.
- 30 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
The Company’s Chief Executive Officer and Chief Financial Officer have used the Committee of Sponsoring Organizations of the Treadway Commission (COSO) 2013 framework to evaluate the Company’s ICFR as of December 31, 2025 and have concluded that these controls and procedures were effective as of December 31, 2025 and provide reasonable assurance that financial information is recorded, processed, summarized and reported in a timely manner. Management is required to apply its judgment in evaluating the cost-benefit relationship of possible controls and procedures. The result of the inherent limitations in all control systems means design of controls cannot provide absolute assurance that all control issues and instances of fraud will be detected. During the year ended December 31, 2025, there were no changes in the Company’s DC&P or ICFR that materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.
RISK FACTORS There are certain risks involved in the Company’s operations, some of which are beyond the Company’s control. Aside from risks relating to business and industry, the Company’s principal operations are located within the People’s Republic of China and are governed by a legal and regulatory environment that in some respects differs from that which prevails in other countries. Readers of this MD&A should give careful consideration to the information included in this document and the Company’s audited annual consolidated financial statements and related notes. Significant risk factors for the Company are metal prices, government regulations, foreign operations, environmental compliance, the ability to obtain additional financing, risk relating to recent acquisitions, dependence on management, title to the Company’s mineral properties, natural disasters, pandemics such as COVID-19 and litigation. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks. For details of risk factors, please refer to the Company’s annual audited consolidated financial statements, and Annual Information Form filed from time to time on SEDAR+ at www.sedarplus.ca and www.hkex.com.hk.
QUALIFIED PERSON Disclosure of scientific or technical information in this MD&A was reviewed and approved by Mr. Tony Guo, MMSA(QP), the Company’s Qualified Person (“QP”) as defined by National Instrument 43-101. March 30, 2026
- 31 -
INDEPENDENT AUDITOR’S REPORT
TO THE SHAREHOLDERS OF CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD.
(incorporated in British Columbia, Canada with limited liability)
OPINION We have audited the consolidated financial statements of China Gold International Resources Corp. Ltd. (the “Company”) and its subsidiaries (collectively referred to as the “Group”) set out on pages 37 to 118, which comprise the consolidated statement of financial position as at December 31, 2025, and the consolidated statement of profit or loss and other comprehensive income, consolidated statement of changes in equity and consolidated statement of cash flows for the year then ended, and notes to the consolidated financial statements, including material accounting policy information. In our opinion, the consolidated financial statements give a true and fair view of the consolidated financial position of the Group as at December 31, 2025, and of its consolidated financial performance and its consolidated cash flows for the year then ended in accordance with IFRS Accounting Standards as issued by the International Accounting Standards Board (“IASB”) and have been properly prepared in compliance with the disclosure requirements of the Hong Kong Companies Ordinance.
BASIS FOR OPINION We conducted our audit in accordance with International Standards on Auditing (“ISAs”). Our responsibilities under those standards are further described in the Auditor’s Responsibilities for the Audit of the Consolidated Financial Statements section of our report. We are independent of the Group in accordance with the “Code of Ethics for Professional Accountants” issued by the Hong Kong Institute of Certified Public Accountants (“Code”), as applicable to audits of financial statements of public interest entities. We also have fulfilled our other ethical responsibilities in accordance with the Code. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion.
KEY AUDIT MATTER Key audit matter is the matter that, in our professional judgment, was of most significance in our audit of the consolidated financial statements of the current period. This matter was addressed in the context of our audit of the consolidated financial statements as a whole, and in forming our opinion thereon, and we do not provide a separate opinion on this matter.
- 32 -
INDEPENDENT AUDITOR’S REPORT
TO THE SHAREHOLDERS OF CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
KEY AUDIT MATTER (Cont’d) Key audit matter
How our audit addressed the key audit matter
Gold in Progress Refer to summary of accounting policies on “inventories” in note 3, accounting estimates and judgements in note 4(b) and disclosure of inventory in note 17 to the consolidated financial statements. For the year ended December 31, 2025, the carrying amount of inventory was approximately US$295 million. Inventory of the Group mainly includes gold in process inventory of approximately US$249 million, representing approximately 7.4% of the Group’s total assets. The Group measured its inventory at the lower of cost and estimated net realisable value. Gold in process inventory represents ore placed on leach pads and in process through heap leaching operations. Due to the nature of heap leaching, the quantity of recoverable gold cannot be directly measured and is instead estimated using models based on ore tonnage, assay grades and expected recovery rates. Assumptions and estimations are required in determining the quantity of gold in process inventories including the gold contained in the ore placed on leach pads and correspondingly gold that is expected to be recovered. The Group could be required to write down the recorded value of its gold in process inventories if estimations and assumptions are inaccurate. Because the nature of leaching process inherently limits the ability to precisely monitor inventory levels. The actual recovery of gold from the leach pad is not known until the leaching process has concluded at the end of the mine life. We have identified existence and valuation on gold in process inventory as a key audit matter because of its significance to the Group’s consolidated financial statements and involvement of significant management estimates in determining estimated outcomes of the models in assessing the existence and valuation of inventory as mentioned in the forgoing paragraphs.
- 33 -
Our procedures in relation to the existence of gold in process inventory included: •
Obtained an understanding of the Group’s process and controls over estimation of gold in process.
•
Tested the underlying production data used in estimation of gold in process used by management.
•
Obtained ore samples during a site visit and submitted these samples to an independent external laboratory testing to assess the reliability and consistency of assay grades used by management.
•
Engaged auditors’ expert to assist our assessment on the appropriateness of recovery rates adopted by management from heap leaching gold processing and the reasonableness on the model applied by management in estimating gold in process from heap leaching.
•
Tested the mathematical accuracy of the goldin-process estimation model and independently recalculated the estimated recoverable gold based on management’s key assumptions.
•
Performed sensitivity analysis on assessing the possible impact of reasonably changes in critical assumption such as recovery rates.
INDEPENDENT AUDITOR’S REPORT
TO THE SHAREHOLDERS OF CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
OTHER MATTERS The consolidated financial statements of the Group for the year ended December 31, 2024 were audited by another auditor who expressed an unmodified opinion on those statements on March 27, 2025.
OTHER INFORMATION The directors are responsible for the other information. The other information comprises the information included in the annual report, but does not include the consolidated financial statements and our auditor’s report thereon. Our opinion on the consolidated financial statements does not cover the other information and we do not express any form of assurance conclusion thereon. In connection with our audit of the consolidated financial statements, our responsibility is to read the other information and, in doing so, consider whether the other information is materially inconsistent with the consolidated financial statements or our knowledge obtained in the audit or otherwise appears to be materially misstated. If, based on the work we have performed, we conclude that there is a material misstatement of this other information, we are required to report that fact. We have nothing to report in this regard.
RESPONSIBILITIES OF DIRECTORS FOR THE CONSOLIDATED FINANCIAL STATEMENTS The directors are responsible for the preparation of the consolidated financial statements that give a true and fair view in accordance with IFRS Accounting Standards as issued by the IASB and the disclosure requirements of the Hong Kong Companies Ordinance, and for such internal control as the directors determine is necessary to enable the preparation of consolidated financial statements that are free from material misstatement, whether due to fraud or error. In preparing the consolidated financial statements, the directors are responsible for assessing the Group’s ability to continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern basis of accounting unless the directors either intend to liquidate the Group or to cease operations, or have no realistic alternative but to do so. The directors are responsible for overseeing the Group’s financial reporting process. The audit committee of Company (the “Audit Committee”) assists the directors in discharging their responsibility in this regard.
AUDITOR’S RESPONSIBILITIES FOR THE AUDIT OF THE CONSOLIDATED FINANCIAL STATEMENTS Our objectives are to obtain reasonable assurance about whether the consolidated financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditor’s report that includes our opinion solely to you, as a body, in accordance with our agreed terms of engagement, and for no other purpose. We do not assume responsibility towards or accept liability to any other person for the contents of this report.
- 34 -
INDEPENDENT AUDITOR’S REPORT
TO THE SHAREHOLDERS OF CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
AUDITOR’S RESPONSIBILITIES FOR THE AUDIT OF THE CONSOLIDATED FINANCIAL STATEMENTS (Cont’d) Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with ISAs will always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are considered material if, individually or in the aggregate, they could reasonably be expected to influence the economic decisions of users taken on the basis of these consolidated financial statements. As part of an audit in accordance with ISAs, we exercise professional judgment and maintain professional skepticism throughout the audit. We also: •
Identify and assess the risks of material misstatement of the consolidated financial statements, whether due to fraud or error, design and perform audit procedures responsive to those risks, and obtain audit evidence that is sufficient and appropriate to provide a basis for our opinion. The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control.
•
Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Group’s internal control.
•
Evaluate the appropriateness of accounting policies used and the reasonableness of accounting estimates and related disclosures made by the directors.
•
Conclude on the appropriateness of the directors’ use of the going concern basis of accounting and, based on the audit evidence obtained, whether a material uncertainty exists related to events or conditions that may cast significant doubt on the Group’s ability to continue as a going concern. If we conclude that a material uncertainty exists, we are required to draw attention in our auditor’s report to the related disclosures in the consolidated financial statements or, if such disclosures are inadequate, to modify our opinion. Our conclusions are based on the audit evidence obtained up to the date of our auditor’s report. However, future events or conditions may cause the Group to cease to continue as a going concern.
•
Evaluate the overall presentation, structure and content of the consolidated financial statements, including the disclosures, and whether the consolidated financial statements represent the underlying transactions and events in a manner that achieves fair presentation.
•
Plan and perform the group audit to obtain sufficient appropriate audit evidence regarding the financial information of the entities or business units within the Group as a basis for forming an opinion on the group financial statements. We are responsible for the direction, supervision and review of the audit work performed for purposes of the group audit. We remain solely responsible for our audit opinion.
- 35 -
INDEPENDENT AUDITOR’S REPORT
TO THE SHAREHOLDERS OF CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
AUDITOR’S RESPONSIBILITIES FOR THE AUDIT OF THE CONSOLIDATED FINANCIAL STATEMENTS (Cont’d) We communicate with the Audit Committee regarding, among other matters, the planned scope and timing of the audit and significant audit findings, including any significant deficiencies in internal control that we identify during our audit. We also provide the Audit Committee with a statement that we have complied with relevant ethical requirements regarding independence, and to communicate with them all relationships and other matters that may reasonably be thought to bear on our independence, and where applicable, actions taken to eliminate threats or safeguards applied. From the matter communicated with the directors, we determine the matter that was of most significance in the audit of the consolidated financial statements of the current period and is therefore the key audit matter. We describe this matter in our auditor’s report unless law or regulation precludes public disclosure about the matter or when, in extremely rare circumstances, we determine that a matter should not be communicated in our report because the adverse consequences of doing so would reasonably be expected to outweigh the public interest benefits of such communication.
BDO Limited
Certified Public Accountants PAK, Tak Lun, Amos Practising Certificate no. P06170 Hong Kong, March 30, 2026
- 36 -
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME FOR THE YEAR ENDED DECEMBER 31, 2025
NOTES
2025 US$’000
2024 US$’000
5
1,310,125 (626,134)
756,646 (569,726)
683,991
186,920
(59,934) (1,133) (32,799)
(47,566) (438) (15,722)
(93,866)
(63,726)
Income from operations
590,125
123,194
Other (expenses) income Foreign exchange loss, net Interest and other income Other expenses Finance costs
(349) 11,731 (22,538) (18,804)
(2,561) 5,109 (10,132) (22,390)
(29,960)
(29,974)
Revenue Cost of sales Mine operating earnings Expenses General and administrative expenses Exploration and evaluation expenditure Research and development expenses
6
7 8
Profit before income tax Income tax expense
9
560,165 (87,850)
93,220 (27,922)
Profit for the year
10
472,315
65,298
Other comprehensive income (expense) for the year Item that will not be reclassified to profit or loss: Fair value gain on equity instruments at fair value through other comprehensive income (“FVTOCI”) Item that may be reclassified subsequently to profit or loss: Exchange difference arising on translation of foreign operations
19
85,464
1,271
25,993
(8,422)
111,457
(7,151)
583,772
58,147
Total comprehensive income for the year
- 37 -
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME FOR THE YEAR ENDED DECEMBER 31, 2025
NOTE
Profit for the year attributable to: Non-controlling interests Owners of the Company
Total comprehensive income for the year attributable to: Non-controlling interests Owners of the Company
2025 US$’000
2024 US$’000
5,356 466,959
2,566 62,732
472,315
65,298
5,356 578,416
2,567 55,580
583,772
58,147
Earnings per share – Basic and Dilutive (US cents)
13
117.80
15.82
Weighted average number of common shares – Basic and Dilutive
13
396,413,753
396,413,753
- 38 -
CONSOLIDATED STATEMENT OF FINANCIAL POSITION AT DECEMBER 31, 2025
Current assets Cash and cash equivalents Restricted bank balances Term deposits Trade and other receivables Prepaid expenses and deposits Inventories
Non-current assets Prepaid expenses and deposits Right-of-use assets Equity instruments at FVTOCI Property, plant and equipment Intangible assets Other non-current assets
NOTES
2025 US$’000
2024 US$’000
14 14 14 15 16 17
399,402 34,162 305,884 8,246 1,794 294,536
183,779 66,698 118,246 7,393 1,513 290,405
1,044,024
668,034
74 104,519 133,875 1,339,447 724,647 9,949
30,095 45,957 48,411 1,375,498 752,414 15,570
2,312,511
2,267,945
3,356,535
2,935,979
181,828 10,063 217,004 28,454 1,417 25,253
175,132 8,099 148,696 – 469 8,650
464,019
341,046
16 18 19 20 21 22
Total assets Current liabilities Accounts and other payables and accrued expenses Contract liabilities Borrowings Entrusted loan payable Lease liabilities Tax liabilities
23 24 25 26 27
- 39 -
CONSOLIDATED STATEMENT OF FINANCIAL POSITION AT DECEMBER 31, 2025
2025 US$’000
2024 US$’000
580,005
326,988
2,892,516
2,594,933
25,419 287,981 – 12,628 135,665 19 93,778
32,822 565,656 27,823 459 112,000 19 69,948
555,490
808,727
1,019,509
1,149,773
1,229,061 266,985 813,095
1,229,061 99,737 433,640
Non-controlling interests
2,309,141 27,885
1,762,438 23,768
Total owners’ equity
2,337,026
1,786,206
Total liabilities and owners’ equity
3,356,535
2,935,979
NOTE
Net current assets Total assets less current liabilities Non-current liabilities Accounts and other payables and accrued expenses Borrowings Entrusted loan payable Lease liabilities Deferred tax liabilities Deferred income Environmental rehabilitation
23 25 26 27 9 28
Total liabilities Owners’ equity Share capital Reserves Retained profits
29
The consolidated financial statements on pages 37 to 118 were approved and authorised for issue by the Board of Directors on March 30, 2026 and are signed on its behalf by:
Chenguang Hou Director
Yingbin Ian He Director
- 40 -
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY FOR THE YEAR ENDED DECEMBER 31, 2025
Attributable to the owners of the Company Number of shares
Share capital US$’000
Equity reserve US$’000
Investments revaluation reserve US$’000
Exchange reserve US$’000
Statutory reserves US$’000 (Note)
Retained profits US$’000
396,413,753
1,229,061
11,179
26,318
(61,875)
121,800
Profit for the year Fair value gain on equity instruments at FVTOCI Exchange difference arising on translation
– – –
– – –
– – –
– 1,271 –
– – (8,423)
Total comprehensive income (expenses) for the year Transfer to statutory reserves – appropriation from retained profits Transfer to reserve fund – appropriation from retained profits Dividends paid to a non-controlling shareholder Other
–
–
–
1,271
–
–
–
– – –
– – –
396,413,753
Profit for the year Fair value gain on equity instruments at FVTOCI Exchange difference arising on translation Total comprehensive income for the year Transfer to statutory reserves – appropriation from retained profits Dividends paid to shareholders Dividends paid to a non-controlling shareholder
At January 1, 2024
At December 31, 2024
At December 31, 2025
Subtotal US$’000
Non– controlling interests US$’000
Total owners’ equity US$’000
380,375
1,706,858
20,883
1,727,741
– – –
62,732 – –
62,732 1,271 (8,423)
2,566 – 1
65,298 1,271 (8,422)
(8,423)
–
62,732
55,580
2,567
58,147
–
–
9,436
(9,436)
–
–
–
– – –
– – –
– – –
31 – –
(31) – –
– – –
– (1,250) 1,568
– (1,250) 1,568
1,229,061
11,179
27,589
(70,298)
131,267
433,640
1,762,438
23,768
1,786,206
– – –
– – –
– – –
– 85,464 –
– – 25,993
– – –
466,959 – –
466,959 85,464 25,993
5,356 – –
472,315 85,464 25,993
–
–
–
85,464
25,993
–
466,959
578,416
5,356
583,772
– – –
– – –
– – –
– – –
– – –
55,791 – –
(55,791) (31,713) –
– (31,713) –
– – (1,239)
– (31,713) (1,239)
396,413,753
1,229,061
11,179
113,053
(44,305)
187,058
813,095
2,309,141
27,885
2,337,026
Note: Statutory reserves which consist of (1) appropriations from the profit after taxation of the subsidiaries established in the People’s Republic of China (“PRC”) and (2) provision of safety production fund of the subsidiaries engaged in the exploration and development in the mining industry, form part of the equity of PRC subsidiaries. In accordance with the PRC Company Law and the Articles of Association of the PRC subsidiaries, the PRC subsidiaries are required to appropriate an amount equal to a minimum of 10% of their profits after taxation each year to a statutory reserve or reserve fund until the reserve reaches 50% of the registered capital of the respective subsidiaries. Pursuant to the Caizi (2022) No.136 on implementation of entities’ safety production funds management, effective on November 21, 2022, and in accordance with the Articles of Association of the PRC subsidiaries, the PRC subsidiaries are required to appropriate an amount, equal to RMB5 per ton multiplied by the volume of ore mined less actual payment, each year to a statutory reserve and utilise an amount when the actual payment is more than RMB5 per ton multiplied by the volume of ore mined.
- 41 -
CONSOLIDATED STATEMENT OF CASH FLOWS FOR THE YEAR ENDED DECEMBER 31, 2025
2025 US$’000
2024 US$’000
560,165
93,220
29,083 131,998 4,918 (8,705) (3,026) 18,804
19,906 121,285 4,776 (3,114) (2,095) 22,390
1,434 5,879 – 2,369 3,956
2,051 – 291 620 1,403
746,875
260,733
Change in operating working capital items: Trade and other receivables Inventories Contract liabilities Restricted bank balances Accounts and other payables and accrued expenses
(2,477) (4,131) 1,964 32,536 (707)
6,470 226 7,954 – 68,414
Cash generated from operations Environmental rehabilitation expense paid Interest paid PRC income tax paid
774,060 (692) (15,802) (47,582)
343,797 (7,841) (19,538) (9,522)
Net cash from operating activities
709,984
306,896
Operating activities Profit before income tax Items not requiring use of cash and cash equivalents: Amortisation of mining rights Depreciation of property, plant and equipment Depreciation of right-of-use assets Interest income Dividend income Finance costs Provision for impairment of: – trade and other receivables – other non-current assets Write-down of inventories Loss on disposal of property, plant and equipment Unrealised foreign exchange loss, net
- 42 -
CONSOLIDATED STATEMENT OF CASH FLOWS FOR THE YEAR ENDED DECEMBER 31, 2025
2025 US$’000
2024 US$’000
Investing activities Interest received Dividends received from equity investment at FVTOCI Payment for acquisition of mining rights Payment for acquisition of property, plant and equipment Proceeds from disposal of property, plant and equipment Deposits paid for water treatment project Payment for land use right Payment for deposit for acquisition of land use right Payment for acquisition of intangible assets Payment for right-of-use assets on or before commencement date Placement of term deposits Release of term deposits
8,705 3,026 – (50,136) 12 – (19,773) – (150) (874) (306,638) 119,000
3,114 2,095 (1,226) (48,286) – (6,096) (11,217) (23,906) – – (133,395) 14,042
Net cash used in investing activities
(246,828)
(204,875)
Financing activities Repayments of borrowings Proceeds from borrowings Dividends paid to a non-controlling shareholder Dividends paid to shareholders Repayments of lease liabilities
(306,219) 86,000 (1,239) (31,713) (514)
(156,955) 142,633 (1,250) – (599)
Net cash used in financing activities
(253,685)
(16,171)
Net increase in cash and cash equivalents Cash and cash equivalents, beginning of year Effect of foreign exchange rate changes on cash and cash equivalents
209,471 183,779 6,152
85,850 97,237 692
Cash and cash equivalents, end of year
399,402
183,779
- 43 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
GENERAL INFORMATION 1.1 General information China Gold International Resources Corp. Ltd. (the “Company”) is a publicly listed company incorporated in British Columbia, Canada on May 31, 2000 with limited liability under the legislation of the Province of British Columbia and its shares are listed on the Toronto Stock Exchange and The Stock Exchange of Hong Kong Limited (the “Stock Exchange”). The Company together with its subsidiaries (collectively referred to as the “Group”) is principally engaged in the acquisition, exploration, development and mining of mineral resources in the PRC. Particulars of the subsidiaries of the Company are set out in note 37. The Group considers that China National Gold Group Co., Ltd. (“CNG”), a state owned company registered in Beijing, the PRC, which is controlled by State-owned Assets Supervision and Administration Commission of the State Council of the PRC, is able to exercise significant influence over the Company. The head office, principal address and registered and records office of the Company are located at Suite 1780, 400 Burrard Street, Vancouver, British Columbia, Canada, V6C 3A6. The consolidated financial statements are presented in United States Dollars (“US$”) which is also the functional currency of the Company.
APPLICATION OF NEW AND AMENDMENTS TO IFRS ACCOUNTING STANDARDS Amendments to IFRS Accounting Standards that are mandatorily effective for the current year In the current year, the Group has applied the following amendments to IFRS Accounting Standards issued by International Accounting Standards Board (the “IASB”) for the first time, which is mandatorily effective for the Group’s annual period beginning on January 1, 2025 for the preparation of the consolidated financial statements: Amendments to IAS 21
Lack of Exchangeability
As the currencies that the Group had transacted in and the functional currencies of overseas entities for translation into the Group’s presentation currency were exchangeable, the application of the amendments to IFRS Accounting Standards in the current year has had no impact on the Group’s financial positions and performance for the current and prior years and/or on the disclosures set out in these consolidated financial statements.
- 44 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
APPLICATION OF NEW AND AMENDMENTS TO IFRS ACCOUNTING STANDARDS (Cont’d) New and amendments to IFRS Accounting Standards in issue but not yet effective The Group has not early applied the following new and amendments to IFRS Accounting Standards that have been issued but are not yet effective: Amendments to IFRS 9 and IFRS 7 Amendments to IFRS 9 and IFRS 7 Amendments to IFRS 10 and IAS 28 IFRS 18 IFRS 19 and its amendments Amendments to IAS 21 Amendments to IFRS Accounting Standards
Amendments to the Classification and Measurement of Financial Instruments2 Contracts Referencing Nature – dependent Electricity2 Sale or Contribution of Assets between an Investor and its Associate or Joint Venture1 Presentation and Disclosure in Financial Statement3 Subsidiaries without Public Accountability: Disclosure3 Translation to a Hyperinflationary Presentation Currency3 Annual Improvement to IFRS Accounting Standards – Volume 112
1
No mandatory effective date yet determined but available for adoption
2
Effective for annual periods beginning on or after January 1, 2026
3
Effective for annual periods beginning on or after January 1, 2027
Except for the new IFRS Accounting Standard mentioned below, the directors of the Company anticipate that the application of other new and amendments to IFRS Accounting Standards will have no material impact on the consolidated financial statements in the foreseeable future.
IFRS 18 Presentation and Disclosure in Financial Statements IFRS 18 Presentation and Disclosure in Financial Statements, which sets out requirements on presentation and disclosures in financial statements, will replace IAS 1 Presentation of Financial Statements. This new IFRS Accounting Standard, while carrying forward many of the requirements in IAS 1, introduces new requirements to present specified categories and defined subtotals in the statement of profit or loss; provide disclosures on management-defined performance measures in the notes to the financial statements and improve aggregation and disaggregation of information to be disclosed in the financial statements. In addition, some IAS 1 paragraphs have been moved to IAS 8 Accounting Policies, Changes in Accounting Estimates and Errors and IFRS 7 Financial Instruments: Disclosures. Minor amendments to IAS 7 Statement of Cash Flows and IAS 33 Earnings per Share are also made. IFRS 18, and amendments to other standards, will be effective for annual periods beginning on or after 1 January 2027, with early application permitted. The application of the new standard is expected to affect the presentation of the statement of profit or loss and disclosures in the future financial statements. The Group is in the process of assessing the detailed impact of IFRS 18 on the Group’s consolidated financial statements.
- 45 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION Basis of preparation of consolidated financial statements The consolidated financial statements have been prepared in accordance with IFRS Accounting Standards issued by the IASB. For the purpose of preparation of the consolidated financial statements, information is considered material if such information is reasonably expected to influence decisions made by primary users. In addition, the consolidated financial statements include applicable disclosures required by the Rules Governing the Listing of Securities on the Stock Exchange (“Listing Rules”) and by the Hong Kong Companies Ordinance (“Co”). The directors of the Company have, at the time of approving the consolidated financial statements, a reasonable expectation that the Group has adequate resources to continue in operational existence for the foreseeable future. Thus they continue to adopt the going concern basis of accounting in preparing the consolidated financial statements.
Material accounting policy information Basis of consolidation The consolidated financial statements incorporate the financial statements of the Company and entities controlled by the Company and its subsidiaries. Control is achieved when the Company: •
has power over the investee;
•
is exposed, or has rights, to variable returns from its involvement with the investee; and
•
has the ability to use its power to affect its returns.
The Group reassesses whether or not it controls an investee if facts and circumstances indicate that there are changes to one or more of the three elements of control listed above. Consolidation of a subsidiary begins when the Group obtains control over the subsidiary and ceases when the Group loses control of the subsidiary. Profit or loss and each item of other comprehensive income are attributed to the owners of the Company and to the non-controlling interests. Total comprehensive income of subsidiaries is attributed to the owners of the Company and to the non-controlling interests even if this results in the non-controlling interests having a deficit balance. When necessary, adjustments are made to the financial statements of subsidiaries to bring their accounting policies in line with the Group’s accounting policies. All intragroup assets and liabilities, equity, income, expenses and cash flows relating to transactions between members of the Group are eliminated in full on consolidation. Non-controlling interests in subsidiaries are presented separately from the Group’s equity therein, which represent present ownership interests entitling their holders to a proportionate share of net assets of the relevant subsidiaries upon liquidation.
- 46 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Revenue from contracts with customers The Group recognises revenue when (or as) a performance obligation is satisfied, i.e. when “control” of the goods or services underlying the particular performance obligation is transferred to the customer. A performance obligation represents a good or service (or a bundle of goods or services) that is distinct or a series of distinct goods or services that are substantially the same. Control is transferred over time and revenue is recognised over time by reference to the progress towards complete satisfaction of the relevant performance obligation if one of the following criteria is met: •
the customer simultaneously receives and consumes the benefits provided by the Group’s performance as the Group performs;
•
the Group’s performance creates or enhances an asset that the customer controls as the Group performs; or
•
the Group’s performance does not create an asset with an alternative use to the Group and the Group has an enforceable right to payment for performance completed to date.
Otherwise, revenue is recognised at a point in time when the customer obtains control of the distinct good or service. A contract asset represents the Group’s right to consideration in exchange for goods or services that the Group has transferred to a customer that is not yet unconditional. It is assessed for impairment in accordance with IFRS 9 Financial Instruments. In contrast, a receivable represents the Group’s unconditional right to consideration, i.e. only the passage of time is required before payment of that consideration is due. A contract liability represents the Group’s obligation to transfer goods or services to a customer for which the Group has received consideration (or an amount of consideration is due) from the customer. A contract asset and a contract liability relating to the same contract are accounted for and presented on a net basis. For contracts where the period between payment and transfer of the associated goods or services is less than one year, the Group applies the practical expedient for not adjusting the transaction price for any significant financing component. Revenue is recognised at a point in time when control of the gold doré bars, copper and other by-products is passed to customers, i.e. when the products are delivered and titles have passed to customers.
- 47 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Leases The Group assesses whether a contract is or contains a lease based on the definition under IFRS 16 at inception of the contract. Such contract will not be reassessed unless the terms and conditions of the contract are subsequently changed.
The Group as a lessee Right-of-use assets The cost of right-of-use asset includes: •
the amount of the initial measurement of the lease liability;
•
any lease payments made at or before the commencement date, less any lease incentives received;
•
any initial direct costs incurred by the Group; and
•
an estimate of costs to be incurred by the Group in dismantling and removing the underlying assets, restoring the site on which it is located or restoring the underlying asset to the condition required by the terms and conditions of the lease.
Right-of-use assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any remeasurement of lease liabilities. Right-of-use assets in which the Group is reasonably certain to obtain ownership of the underlying leased assets at the end of the lease term are depreciated from commencement date to the end of the useful life. Otherwise, rightof-use assets are depreciated on a straight-line basis over the shorter of its estimated useful life and the lease term. The Group presents right-of-use assets as a separate line item on the consolidated statement of financial position.
- 48 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Foreign currencies In preparing the financial statements of each individual group entity, transactions in currencies other than the functional currency of that entity (foreign currencies) are recognised at the rates of exchanges prevailing on the dates of the transactions. At the end of the reporting period, monetary items denominated in foreign currencies are retranslated at the rates prevailing at that date. Non-monetary items carried at fair value that are denominated in foreign currencies are retranslated at the rates prevailing on the date when the fair value was determined. When a fair value gain or loss on a non-monetary item is recognised in profit or loss, any exchange component of that gain or loss is also recognised in profit or loss. When a fair value gain or loss on a non-monetary item is recognised in other comprehensive income, any exchange component of that gain or loss is also recognised in other comprehensive income. Non-monetary items that are measured in terms of historical cost in a foreign currency are not retranslated. Exchange differences arising on the settlement of monetary items, and on the retranslation of monetary items, are recognised in profit or loss in the period in which they arise. For the purposes of presenting the consolidated financial statements, the assets and liabilities of the Group’s operations are translated into the presentation currency of the Group (i.e. US$) using exchange rates prevailing at the end of each reporting period. Income and expenses items are translated at the average exchange rates for the period. Exchange differences arising, if any, are recognised in other comprehensive income and accumulated in equity under the heading of exchange reserve (attributed to non-controlling interests as appropriate).
Borrowing costs Borrowing costs directly attributable to the acquisition, construction or production of qualifying assets, which are assets that necessarily take a substantial period of time to get ready for their intended use or sale, are added to the cost of those assets until such time as the assets are substantially ready for their intended use or sale. All other borrowing costs are recognised in profit or loss in the period in which they are incurred.
Taxation Income tax expense represents the sum of current and deferred income tax expense. The tax currently payable is based on taxable profit for the year. Taxable profit differs from profit/(loss) before income tax because of income or expense that are taxable or deductible in other years and items that are never taxable or deductible. The Group’s liability for current tax is calculated using tax rates that have been enacted or substantively enacted by the end of the reporting period.
- 49 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Taxation (Cont’d) Deferred tax is recognised on temporary differences between the carrying amounts of assets and liabilities in the consolidated financial statements and the corresponding tax bases used in the computation of taxable profit. Deferred tax liabilities are generally recognised for all taxable temporary differences. Deferred tax assets are generally recognised for all deductible temporary differences to the extent that it is probable that taxable profits will be available against which those deductible temporary differences can be utilised. Such deferred tax assets and liabilities are not recognised if the temporary difference arises from the initial recognition (other than in a business combination) of assets and liabilities in a transaction that affects neither the taxable profit nor the accounting profit and at the time of the transaction does not give rise to equal taxable and deductible temporary differences. Deferred tax liabilities are recognised for taxable temporary differences associated with investments in subsidiaries, except where the Group is able to control the reversal of the temporary difference and it is probable that the temporary difference will not reverse in the foreseeable future. Deferred tax assets arising from deductible temporary differences associated with such investments are only recognised to the extent that it is probable that there will be sufficient taxable profits against which to utilise the benefits of the temporary differences and they are expected to reverse in the foreseeable future. The carrying amount of deferred tax assets is reviewed at the end of each reporting period and reduced to the extent that it is no longer probable that sufficient taxable profits will be available to allow all or part of the asset to be recovered. Deferred tax assets and liabilities are measured at the tax rates that are expected to apply in the period in which the liability is settled or the asset is realised, based on tax rate (and tax laws) that have been enacted or substantively enacted by the end of the reporting period. The measurement of deferred tax liabilities and assets reflects the tax consequences that would follow from the manner in which the Group expects, at the end of the reporting period, to recover or settle the carrying amount of its assets and liabilities. For ultimate costs incurred for provisions for environmental rehabilitation, the Group applies IAS 12 requirements to the provisions for environmental rehabilitation and the related assets separately. The Group recognises a deferred tax asset related to provisions for environmental rehabilitation to the extent that it is probable that taxable profit will be available against which the deductible temporary difference can be utilised and a deferred tax liability for all taxable temporary differences. Deferred tax assets and liabilities are offset when there is a legally enforceable right to set off current tax assets against current tax liabilities and when they relate to income taxes levied to the same taxable entity by the same taxation authority. Current and deferred tax are recognised in profit or loss.
- 50 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Cash and cash equivalents Cash and cash equivalents presented on the consolidated statement of financial position comprises of cash on hand and demand deposits.
Inventories Inventories are stated at the lower of cost and net realisable value. Costs of inventories are determined using the weighted average cost method. Net realisable value is the estimated selling price in the ordinary course of business less the estimated costs of completion and the estimated costs necessary to make the sale. Costs necessary to make the sale include incremental costs directly attributable to the sale and non-incremental costs which the Group must incur to make the sale.
Gold in process inventory Gold in process inventory consists of gold contained in the ore on leach pads and in-circuit material within processing operations. Production costs are capitalised and included in gold in process inventory based on the current mining and processing cost incurred up to the point prior to the refining process including the cost of raw materials and direct labour; mine-site overhead expenses; stripping costs; and allocated indirect costs, including depreciation and depletion of mining interests.
Gold doré bars inventory Gold doré bar is gold awaiting refinement and gold refined and ready for sales. The recovery of gold from ore is achieved through a heap leaching process. Under this method, ore is placed on leach pads where it is treated with a chemical solution which dissolves the gold contained in the ore. The resulting “pregnant” solution is further processed in a plant where the gold is recovered. Costs are subsequently recycled from ore on leach pads as ounces of gold are recovered based on the average cost per recoverable ounce on the leach pad. Estimates of recoverable gold on the leach pads are calculated from the quantities of ore placed on the leach pads (measured in tonnes added to the leach pads), the grade of the ore placed on the leach pads (based on assay data), and a recovery percentage (based on ore type).
Others Copper inventory is copper and other by-products after metallurgical processing and ready for sales. Consumables used in operations, such as fuel, chemicals, and reagents and spare parts inventory are valued at the lower of cost or net realisable value.
- 51 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Inventories (Cont’d) Provisions Provisions are recognised when the Group has a present obligation (legal or constructive) as a result of a past event, it is probable that the Group will be required to settle that obligation, and a reliable estimate can be made of the amount of the obligation. The amount recognised as a provision is the best estimate of the consideration required to settle the present obligation at the end of the reporting period, taking into account the risks and uncertainties surrounding the obligation. When a provision is measured using the cash flows estimated to settle the present obligation, its carrying amount is the present value of those cash flows (where the effect of the time value of money is material).
Contingent liabilities A contingent liability is a present obligation arising from past events but is not recognised because it is not probable that an outflow of resources embodying economic benefits will be required to settle the obligation. Where the Group is jointly and severally liable for an obligation, the part of the obligation that is expected to be met by other parties is treated as a contingent liability and it is not recognised in the consolidated financial statements. The Group assesses continually to determine whether an outflow of resources embodying economic benefits has become probable. If it becomes probable that an outflow of future economic benefits will be required for an item previously dealt with as a contingent liability, a provision is recognised in the consolidated financial statements in the reporting period in which the change in probability occurs, except in the extremely rare circumstances where no reliable estimate can be made.
Environmental rehabilitation An obligation to incur restoration, rehabilitation and environmental costs arises when environmental disturbance is caused by the development or ongoing production of a mining property. Such costs arising from the decommissioning of plant and other site preparation work, discounted to their net present value, are provided for and capitalised as part of the related property, plant and equipment at the start of each project, as soon as the obligation to incur such costs arises. These costs are recognised in profit or loss over the life of the operation, through depreciation of the asset. Costs for restoration of subsequent site damage which is created on an ongoing basis during production are recognised in profit or loss. Changes in the measurement of a liability relating to the decommissioning of plant or other site preparation work that result from changes in the estimated timing or amount of the cash flow, including the effects of inflation and movements in foreign exchange rates, revisions to estimated reserves, resources and lives of operations, or a change in the discount rate, are added to, or deducted from, the cost of the related asset in the period it occurred. The periodic unwinding of discount is recognised in profit or loss as a finance cost as it occurs. If a decrease in the liability exceeds the carrying amount of the asset, the excess is recognised immediately in profit or loss. If the asset value is increased and there is an indication that the revised carrying value is not recoverable, an impairment test is performed in accordance with the Group’s accounting policy.
- 52 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Property, plant and equipment Property, plant and equipment are tangible assets that are held for use in the production or supply of goods or services, or for administrative purposes (other than construction in progress as described below). Property, plant and equipment are stated in the consolidated statement of financial position at cost less subsequent accumulated depreciation and subsequent accumulated impairment losses, if any. Depreciation is recognised so as to write off the cost of assets other than properties under construction less their residual values over their estimated useful lives, using the straight-line method. The estimated useful lives, residual values and depreciation method are reviewed at the end of each reporting period, with the effect of any changes in estimate accounted for on a prospective basis. Assets under construction in progress are carried at cost, less any recognised impairment loss. Costs include any costs directly attributable to bringing the asset to the location and condition necessary for it to be capable of operating in the manner intended by management, including costs of testing whether the related assets is functioning properly and, for qualifying assets, borrowing costs capitalised in accordance with the Group’s accounting policy. Depreciation of these assets, on the same basis as other property assets, commences when the assets are ready for their intended use. When the Group makes payments for ownership interests of properties which includes both leasehold land and building elements, the entire consideration is allocated between the leasehold land and the building elements in proportion to the relative fair values at initial recognition. To the extent the allocation of the relevant payments can be made reliably, interest in leasehold land is presented as “right-of-use assets” in the consolidated statement of financial position. When the consideration cannot be allocated reliably between non-lease building element and undivided interest in the underlying leasehold land, the entire properties are classified as property, plant and equipment. An item of property, plant and equipment is derecognised upon disposal or when no future economic benefits are expected to arise from the continued use of the asset. Any gain or loss arising on the disposal or retirement of an item of property, plant and equipment is determined as the difference between the sales proceeds and the carrying amount of the asset and is recognised in profit or loss.
Exploration and evaluation expenditure Drilling and related costs incurred on sites without an existing mine and on areas outside the boundary of a known mineral deposit which contains proven and probable reserves are exploration and evaluation expenditure and are expensed as incurred up to the date on which costs incurred are economically recoverable. Further exploration and evaluation expenditures, subsequent to the establishment of economic recoverability, are capitalised and included in the carrying amount of the mineral assets.
- 53 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Property, plant and equipment (Cont’d) Exploration and evaluation expenditure (Cont’d) The Management evaluates the following criteria in its assessment of economic recoverability and probability of future economic benefit: •
Geology – whether or not there is sufficient geologic and economic certainty of being able to convert a residual mineral deposit into a proven and probable reserve at a development stage or production stage mine, based on the known geology and metallurgy. A history of conversion of resources to reserves at operating mines is used to support the likelihood of conversion.
•
Scoping – there is a scoping study or preliminary feasibility study that demonstrates the additional resources will generate a positive commercial outcome. Known metallurgy provides a basis for concluding there is a significant likelihood of being able to recoup the incremental costs of extraction and production.
•
Accessible facilities – mining property can be processed economically at accessible mining and processing facilities where applicable.
•
Life of mine plans – an overall life of mine plan and economic model to support the mine and the economic extraction of resources/reserves exists. A long-term life of mine plan, and supporting geological model identifies the drilling and related development work required to expand or further define the existing orebody.
•
Authorizations – operating permits and feasible environmental programs exist or are obtainable.
Therefore prior to capitalising exploration drilling and related costs, the Management determines that the following conditions have been met that will contribute to future cash flows: •
There is a probable future benefit that will contribute to future cash inflows;
•
The Group can obtain the benefit and controls access to it;
•
The transaction or event giving rise to the future benefit has already occurred; and
•
Costs incurred can be measured reliably.
Development expenditure Drilling and related costs incurred to define and delineate a mineral deposit are capitalised as part of mineral assets in the period incurred, when the Management determines that there is sufficient evidence that the expenditure will result in a probable future economic benefit to the Group.
- 54 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Property, plant and equipment (Cont’d) Production expenditure A mine that is under construction is determined to enter the production stage when the project is in the position and condition necessary for it to be capable of operating in the manner intended by the Management. Therefore, such costs incurred are capitalised as part of the mineral assets. Mine development costs incurred to maintain current production are included in cost of inventories. For those areas being developed which will be mined in future periods, the costs incurred are capitalised and depleted when the related mining area is mined.
Depreciation Mineral assets are depreciated using the unit-of-production method based on the actual production volume over the estimated total recoverable ounces contained in proven and probable reserves at the related mine when the mine is capable of operating as intended by the Management. The Management reviews the estimated total recoverable ounces contained in proven and probable reserves at the end of each reporting period and when events and circumstances indicate that such a review should be made. Changes to estimated total recoverable ounces contained in proven and probable reserves are accounted for prospectively. Assets under construction are not depreciated until they are substantially complete and available for their intended use. Leasehold improvements are depreciated over the shorter of the lease term and the estimated useful lives of the assets.
Mining rights Mining rights are amortised using the unit-of-production method based on the actual production volume over the estimated total recoverable ounces contained in proven and probable reserves at the related mine.
Mining rights acquired in a business combination Mining rights acquired in a business combination are recognised separately from goodwill and are initially recognised at their fair value at the acquisition date (which is regarded as their cost). Subsequent to initial recognition, mining rights with finite useful lives are carried at costs less accumulated amortisation and any accumulated impairment losses. Amortisation is provided using the unit-of-production method based on the actual production volume over the estimated total proven and probable reserves of the ore mines.
Variable payments for acquiring mining rights that are not part of a business combination Variable payments that are dependent on the Group’s future activity (including payments based on sales, revenues or outputs produced) are recognised in profit or loss in the period in which they arise.
- 55 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Other non-current assets The right to receive a block of buildings and twenty car parks included under “other non-current assets” is carried at cost less accumulated impairment, if any.
Impairment of property, plant and equipment, right-of-use assets, mining rights and other non-current assets At the end of the reporting period, the Group reviews the carrying amounts of its property, plant and equipment, right-of-use assets, mining rights and other non-current assets to determine whether there is any indication that those assets have suffered an impairment loss. If any such indication exists, the recoverable amount of the relevant asset is estimated in order to determine the extent of the impairment loss, if any. The recoverable amounts of property, plant and equipment, right-of-use assets, mining rights and other non-current assets are estimated individually. When it is not possible to estimate the recoverable amount individually, the Group estimates the recoverable amount of the cash-generating unit (“CGU”) to which the asset belongs. In testing a CGU for impairment, corporate assets are allocated to the relevant CGU when a reasonable and consistent basis of allocation can be established, or otherwise they are allocated to the smallest group of CGUs for which a reasonable and consistent allocation basis can be established. The recoverable amount is determined for the CGU or group of CGUs to which the corporate asset belongs, and is compared with the carrying amount of the relevant CGU or group of CGUs. Recoverable amount is the higher of fair value less costs of disposal and value in use (“VIU”). In assessing VIU, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the asset (or a CGU) for which the estimates of future cash flows have not been adjusted. If the recoverable amount of an asset (or a CGU) is estimated to be less than its carrying amount, the carrying amount of the asset (or a CGU) is reduced to its recoverable amount. For corporate assets or portion of corporate assets which cannot be allocated on a reasonable and consistent basis to a CGU, the Group compares the carrying amount of a group of CGUs, including the carrying amounts of the corporate assets or portion of corporate assets allocated to that group of CGUs, with the recoverable amount of the group of CGUs. In allocating the impairment loss, the impairment loss is allocated first to reduce the carrying amount of any goodwill (if applicable) and then to the other assets on a pro-rata basis based on the carrying amount of each asset in the unit or the group of CGUs. The carrying amount of an asset is not reduced below the highest of its fair value less costs of disposal (if measurable), its VIU (if determinable) and zero. The amount of the impairment loss that would otherwise have been allocated to the asset is allocated pro rata to the other assets of the unit or the group of CGUs. An impairment loss is recognised immediately in profit or loss. Where an impairment loss subsequently reverses, the carrying amount of the asset (or a CGU or a group of CGUs) is increased to the revised estimate of its recoverable amount, but so that the increased carrying amount does not exceed the carrying amount that would have been determined had no impairment loss been recognised for the asset (or a CGU or a group of CGUs) in prior years. A reversal of an impairment loss is recognised immediately in profit or loss.
- 56 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Research and development expenses Expenditure on research activities is recognised as an expense in the period in which it is incurred. Development expenditure that is not recognised as an internally-generated intangible asset is recognised in profit or loss in the period in which it is incurred.
Financial instruments Financial assets and financial liabilities are initially measured at fair value except for trade receivables arising from contracts with customers which are initially measured in accordance with IFRS 15. Transaction costs that are directly attributable to the acquisition or issue of financial assets and financial liabilities (other than financial assets or financial liabilities at fair value through profit or loss (“FVTPL”)) are added to or deducted from the fair value of financial assets or financial liabilities, as appropriate, on initial recognition. Transaction costs directly attributable to the acquisition of financial assets or financial liabilities at FVTPL are recognised immediately in profit or loss. The effective interest method is a method of calculating the amortised cost of a financial asset or financial liability and of allocating interest income and interest expense over the relevant period. The effective interest rate is the rate that exactly discounts estimated future cash receipts and payments (including all fees and points paid or received that form an integral part of the effective interest rate, transaction costs and other premiums or discounts) through the expected life of the financial asset or financial liability, or, where appropriate, a shorter period, to the net carrying amount on initial recognition.
Financial assets Classification and subsequent measurement of financial assets Financial assets that meet the following conditions are subsequently measured at amortised cost: •
the financial asset is held within a business model whose objective is to collect contractual cash flows; and
•
the contractual terms give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding.
Debt instruments that meet the following conditions are subsequently measured at FVTOCI: •
the financial asset is held within a business model whose objective is achieved by both collecting contractual cash flows and selling the financial assets; and
•
the contractual terms give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding.
- 57 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Financial instruments (Cont’d) Financial assets (Cont’d) Classification and subsequent measurement of financial assets (Cont’d) All other financial assets are subsequently measured at FVTPL, except that at initial recognition of a financial asset the Group may irrevocably elect to present subsequent changes in fair value of an equity investment in other comprehensive income if that equity investment is neither held for trading nor contingent consideration recognised by an acquirer in a business combination to which IFRS 3 Business Combinations applies. In addition, the Group may irrevocably designate a financial asset that is required to be measured at the amortised cost or FVTOCI as measured at FVTPL if doing so eliminates or significantly reduces an accounting mismatch. Equity instruments designated as at FVTOCI Investments in equity instruments at FVTOCI are subsequently measured at fair value with gains and losses arising from changes in fair value recognised in other comprehensive income and accumulated in the investments revaluation reserve; and are not subject to impairment assessment. The cumulative gain or loss will not be reclassified to profit or loss on disposal of the equity investments, and will be transferred to retained profits. Dividends from these investments in equity instruments are recognised in profit or loss when the Group’s right to receive the dividends is established, unless the dividends clearly represent a recovery of part of the cost of the investment. Dividends are included in the “interest and other income” line item in profit or loss. Impairment of financial assets subject to impairment assessment under IFRS 9 The Group performs impairment assessment under expected credit loss (“ECL”) model on financial assets (including trade receivables, other receivables, amounts due from related companies, term deposits, cash and cash equivalents and restricted balances) which are subject to impairment assessment under IFRS 9. The amount of ECL is updated at each reporting date to reflect changes in credit risk since initial recognition. Simplified approach For trade receivables that do not contain a significant financing component, the Group applies simplified approach in calculating ECLs. Under the simplified approach, the Group does not track changes in credit risk, but instead recognises a loss allowance based on lifetime ECLs at each reporting date. Lifetime ECL represents the ECL that will result from all possible default events over the expected life of the relevant instrument. In contrast, 12-month ECL (“12m ECL”) represents the portion of lifetime ECL that is expected to result from default events that are possible within 12 months after the reporting date. Assessments are done based on the Group’s historical credit loss experience, adjusted for factors that are specific to the debtors, general economic conditions and an assessment of both the current conditions at the reporting date as well as the forecast of future conditions.
- 58 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Financial instruments (Cont’d) Financial assets (Cont’d) Impairment of financial assets subject to impairment assessment under IFRS 9 (Cont’d) Other than trade receivables, at each reporting date, the Group assesses whether the credit risk on a financial instrument has increased significantly since initial recognition. When making the assessment, the Group compares the risk of a default occurring on the financial instrument as at the reporting date with the risk of a default occurring on the financial instrument as at the date of initial recognition and considers reasonable and supportable information that is available without undue cost or effort, including historical and forward-looking information. The Group considers that there has been a significant increase in credit risk when contractual payments are more than 30 days past due. The Group considers a financial asset in default when contractual payments are 90 days past due. However, in certain cases, the Group may also consider a financial asset to be in default when internal or external information indicates that the Group is unlikely to receive the outstanding contractual amounts in full before taking into account any credit enhancements held by the Group. A financial asset is written off when there is no reasonable expectation of recovering the contractual cash flows. The measurement of ECL is a function of the probability of default, loss given default (i.e. the magnitude of the loss if there is a default) and the exposure at default. The assessment of the probability of default and loss given default is based on historical data and forward-looking information. Estimation of ECL reflects an unbiased and probabilityweighted amount that is determined with the respective risks of default occurring as the weights. Generally, the ECL is the difference between all contractual cash flows that are due to the Group in accordance with the contract and the cash flows that the Group expects to receive, discounted at the effective interest rate determined at initial recognition. The Group recognises an impairment gain or loss in profit or loss for all financial instruments by adjusting their carrying amount, with the exception of trade receivables where the corresponding adjustment is recognised through a loss allowance account. Foreign exchange gains and losses The carrying amount of financial assets that are denominated in a foreign currency is determined in that foreign currency and translated at the spot rate at the end of each reporting period. Specifically: •
For financial assets measured at amortised cost, exchange differences are recognised in profit or loss in the “foreign exchange loss, net” line item in profit or loss;
•
For equity instruments measured at FVTOCI, exchange differences are recognised in other comprehensive income in the investments revaluation reserve.
- 59 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Financial instruments (Cont’d) Financial assets (Cont’d) Derecognition of financial assets The Group derecognises a financial asset only when the contractual rights to the cash flows from the asset expire, or when it transfers the financial asset and substantially all the risks and rewards of ownership of the asset to another entity. On derecognition of a financial asset measured at amortised cost, the difference between the asset’s carrying amount and the sum of the consideration received and receivable is recognised in profit or loss. On derecognition of an investment in equity instrument which the Group has elected on initial recognition to measure at FVTOCI, the cumulative gain or loss previously accumulated in the investments revaluation reserve is not reclassified to profit or loss, but is transferred to retained profits.
Financial liabilities and equity instruments Classification as debt or equity Debt and equity instruments issued by a group entity are classified as either financial liabilities or as equity in accordance with the substance of the contractual arrangements and the definitions of a financial liability and an equity instrument. Equity instruments An equity instrument is any contract that evidences a residual interest in the assets of an entity after deducting all of its liabilities. Equity instruments issued by the Company are recognised at the proceeds received, net of direct issue costs. Financial liabilities at amortised cost Financial liabilities including borrowings, entrusted loan payable, accounts and other payables are initially measured at fair value, net of transaction costs, and are subsequently measured at amortised cost using the effective interest method. Foreign exchange gains and losses For financial liabilities that are denominated in a foreign currency and are measured at amortised cost at the end of each reporting period, the foreign exchange gains and losses are determined based on the amortised cost of the instruments. These foreign exchange gains and losses are recognised in the “foreign exchange loss, net” line item in profit or loss. Derecognition of financial liabilities The Group derecognises financial liabilities when, and only when, the Group’s obligations are discharged, cancelled or have expired. The difference between the carrying amount of the financial liability derecognised and the consideration paid and payable is recognised in profit or loss.
- 60 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
CRITICAL ACCOUNTING JUDGEMENT AND KEY SOURCES OF ESTIMATION UNCERTAINTY In the application of the Group’s accounting policies, the directors of the Company are required to make judgements, estimates and assumptions about the carrying amounts of assets and liabilities that are not readily apparent from other sources. The estimates and underlying assumptions are based on historical experience and other factors that are considered to be relevant. Actual results may differ from these estimates. The estimates and underlying assumptions are reviewed on an on-going basis. Revisions to accounting estimates are recognised in the period in which the estimate is revised if the revision affects only that period, or in the period of the revision and future periods if the revision affects both current and future periods.
Key sources of estimation uncertainty The following are the key assumptions concerning the future, and other key sources of estimation uncertainty at the end of the reporting period that may have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year.
(a)
Impairment of non-financial assets In determining whether an asset is impaired or the event previously causing the impairment no longer exists, the Group has to exercise judgement in the area of asset impairment, particularly in assessing:
(b)
(i)
whether an event has occurred that may affect the asset value or such event affecting the asset value has not been in existence;
(ii)
whether the carrying value of an asset or a CGU can be supported by the recoverable amount of the CGU, which is the higher of fair value less costs of disposal and value-in- use of the CGU. The value-in-use calculation is based on the net present value of future cash flows which are estimated based upon the continued use of the asset or CGU, or derecognition; and
(iii)
the appropriate key assumptions to be applied in preparing cash flow projections including whether these cash flow projections are discounted using an appropriate rate. Changing the assumptions selected by management to determine the level of impairment, including the discount rates or the growth rate assumptions in the cash flow projections, could materially affect the net present value used in the impairment test.
Inventories The Group records the cost of gold mining ore placed on its leach pads and in process at its mine as gold in process inventory, and values gold in process inventory at the lower of cost and estimated net realisable value. The assumptions used in the valuation of gold in process inventories include estimates of gold contained in the ore placed on leach pads, and the amount of gold that is expected to be recovered from the ore placed on leach pads. If these estimates or assumptions are proven inaccurate, the Group could be required to write down the recorded value of its gold in process inventories. During the year, there is no change in the relevant estimation. Although the quantities of recoverable gold placed on the leach pad and the processing plant are reconciled by comparing the grades of ore placed on the leach pad to the quantities actually recovered, the nature of the leaching process inherently limits the ability to precisely monitor inventory levels. The actual recovery of gold from the leach pad is not known until the leaching process has concluded at the end of the mine life.
- 61 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
CRITICAL ACCOUNTING JUDGEMENT AND KEY SOURCES OF ESTIMATION UNCERTAINTY (Cont’d) Key sources of estimation uncertainty (Cont’d) (b)
Inventories (Cont’d) The Management periodically reassesses the assumptions used in the valuation of gold in process, particularly the estimated recovery rate to calculate the amount of gold that is expected to be recovered from the ore placed on leach pads (the “Estimated Recovery Rate”). As of December 31, 2025, the Group applies an Estimated Recovery Rate derived from metallurgical recovery assumptions disclosed in the NI 43-101 technical report and adjusted, where appropriate, based on current operating conditions and historical performance. An increase/decrease in the Estimated Recovery Rate by ±3 percentage points would lead to a decrease/ increase in the average production cost of gold doré bars by US$11.7 million. During the year, there is no change in the relevant estimation. The carrying amounts of gold in process and gold doré bars as at December 31, 2025 and 2024 are disclosed in note 17.
(c)
Contingency The Group is involved in a legal proceeding with an independent mine construction contractor of Huatailong and has applied judgement on whether it is probable that an outflow of economic benefits will be required by taking into account the new evidences and materials collected and the legal advice. Disclosures has been set out in note 31(iii) and no related provision has been made as of December 31, 2025.
(d)
Depreciation and amortisation of mining related assets and reserves estimates As explained in note 3, mineral assets and mining rights are depreciated and amortised using the units of production method based on the proved and probable mineral reserves. Engineering estimates of the Group’s mineral reserves are inherently imprecise and represent only approximate amounts because of the subjective judgements involved in developing such information. There is a national standard set by the PRC Government regarding the engineering criteria that have to be met before estimated mineral reserves can be designated as “proved and probable”. Proved and probable mineral reserve estimates are updated at regular basis and have taken into account recent production and technical information about each mine. In addition, as prices and cost levels change from year to year, the estimate of proved and probable gold reserves also changes. This change is considered a change in estimate for accounting purposes and is reflected on a prospective basis in related depreciation rates. Despite the inherent imprecision in these engineering estimates, these estimates are used in determining depreciation and amortisation expenses. Depreciation rates are determined based on estimated proved and probable gold reserve quantity (the denominator) and capitalised costs of mineral assets and mining rights (the numerator). The capitalised cost of mineral assets and mining rights are amortised based on the units of gold equivalent metal volume produced.
- 62 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
REVENUE AND SEGMENT INFORMATION Revenue (i)
Disaggregation of revenue from contracts with customers The following is an analysis of the Group’s revenue from its major products and service:
At a point in time Gold doré bars Copper Other by-products and service (note) Total revenue
2025 US$’000
2024 US$’000
338,473 495,555 476,098
246,946 283,224 226,476
1,310,125
756,646
Note: Other by-products mainly consist of molybdenum, silver, lead and zinc. Other services consist of transportation services, which contribute to less than 1% (2024: less than 1%) of total revenue of the Group during the year ended December 31, 2025.
(ii)
Performance obligations for contracts with customers The Group sells gold doré bars, copper and other by-products directly to customers. Revenue is recognised at a point in time when control of the gold doré bars, copper and other by-products is passed to customers, i.e. when the products are delivered and titles have passed to customers. A contract liability represents the Group’s obligation to transfer goods or services to a customer for which the Group has received consideration (or an amount of consideration is due) from the customer. All sales of gold doré bars, copper and other by-products are for periods of one year or less. As permitted under IFRS 15, the transaction price allocated to these unsatisfied contracts is not disclosed.
- 63 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
REVENUE AND SEGMENT INFORMATION (Cont’d) Segment information IFRS 8 Operating Segment requires operating segments to be identified on the basis of internal reports that are regularly reviewed by the chief operating decision-maker (“CODM”) to allocate resources to the segments and to assess their performance. The CODM, who is responsible for allocating resources and assessing performance of the operating segments, has been defined as the executive directors of the Company. The CODM has identified two operating and reportable segments as follows: (i)
The mine-produced gold segment – the production of gold doré bars through the Group’s integrated processes, i.e., mining, metallurgical processing, production and selling of gold doré bars to external clients.
(ii)
The mine-produced copper concentrate segment – the production of copper concentrate including other byproducts through the Group’s integrated processes, i.e., mining, metallurgical processing, production and selling copper concentrate including other by-products to external clients.
Information regarding the above segments is reported below.
(a)
Segment revenue and results The following is an analysis of the Group’s revenue and results by operating and reportable segment: For the year ended December 31, 2025
Mine – produced gold US$’000
Mine – produced copper concentrate US$’000
Segment total US$’000
Unallocated US$’000
Consolidated US$’000
Revenue – external and segment revenue Cost of sales
338,473 (164,876)
971,652 (461,258)
1,310,125 (626,134)
– –
1,310,125 (626,134)
Mining operating earnings
173,597
510,394
683,991
–
683,991
Income (loss) from operations Foreign exchange gain (loss), net Interest and other income Other expenses Finance costs
172,464
421,723
594,187
(4,062)
590,125
105 4,568 – (344)
(458) 4,217 (22,538) (14,428)
(353) 8,785 (22,538) (14,772)
4 2,946 – (4,032)
(349) 11,731 (22,538) (18,804)
Profit (loss) before income tax
176,793
388,516
565,309
(5,144)
560,165
- 64 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
REVENUE AND SEGMENT INFORMATION (Cont’d) Segment information (Cont’d) (a)
Segment revenue and results (Cont’d) For the year ended December 31, 2024
Mine – produced gold US$’000
Mine – produced copper concentrate US$’000
Segment total US$’000
Unallocated US$’000
Consolidated US$’000
Revenue – external and segment revenue Cost of sales
246,946 (165,574)
509,700 (404,152)
756,646 (569,726)
– –
756,646 (569,726)
Mining operating earnings
81,372
105,548
186,920
–
186,920
Income (loss) from operations Foreign exchange loss, net Interest and other income Other expenses Finance costs
80,934 (2,087) 2,615 – (404)
46,244 (296) 258 (10,132) (17,054)
127,178 (2,383) 2,873 (10,132) (17,458)
(3,984) (178) 2,236 – (4,932)
123,194 (2,561) 5,109 (10,132) (22,390)
Profit (loss) before income tax
81,058
19,020
100,078
(6,858)
93,220
The accounting policies of the operating segments are the same as the Group’s accounting policies. Segment results represent profit (loss) before income tax without allocation of certain general and administrative expenses, foreign exchange loss, other expenses, interest and other income and finance costs, attributable to the respective segment. This is the measure reported to the CODM for the purposes of resource allocation and performance assessment. There are no inter-segment sales for the years ended December 31, 2025 and 2024.
- 65 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
REVENUE AND SEGMENT INFORMATION (Cont’d) Segment information (Cont’d) (b)
Segment assets and liabilities The following is an analysis of the Group’s assets and liabilities by segment representing assets/liabilities directly attributable to the respective segment:
Mine – produced gold US$’000
Mine – produced copper concentrate US$’000
Segment total US$’000
Unallocated US$’000
Consolidated US$’000
750,910 50,237
2,451,131 887,806
3,202,041 938,043
154,494 81,466
3,356,535 1,019,509
599,908 34,886
2,266,611 1,033,576
2,866,519 1,068,462
69,460 81,311
2,935,979 1,149,773
As of December 31, 2025 Total assets Total liabilities As of December 31, 2024 Total assets Total liabilities
For the purposes of monitoring segment performance and allocating resources between segments: •
all assets are allocated to operating segments other than certain cash and cash equivalents, other receivables, prepaid expenses and deposits, right-of-use assets, property, plant and equipment and equity instruments at FVTOCI; and
•
all liabilities are allocated to operating segments other than other payables and accrued expenses, lease liabilities, deferred income and certain borrowings.
- 66 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
REVENUE AND SEGMENT INFORMATION (Cont’d) Segment information (Cont’d) (c)
Other segment information (included in the measure of segment profit or loss or segment assets regularly provided to the CODM) Mine – produced gold US$’000
Mine – produced copper concentrate US$’000
Segment total US$’000
Unallocated US$’000
Consolidated US$’000
7,276 141 –
43,453 62,807 150
50,729 62,948 150
– 206 –
50,729 63,154 150
(36,882)
(95,116)
(131,998)
–
(131,998)
(719)
(28,364)
(29,083)
–
(29,083)
(3,318)
(1,543)
(4,861)
(57)
(4,918)
6,311 –
28,027 11,217
34,338 11,217
– –
34,338 11,217
(54,408)
(66,877)
(121,285)
–
(121,285)
(788)
(19,118)
(19,906)
–
(19,906)
(3,606)
(1,071)
(4,677)
(99)
(4,776)
For the year ended December 31, 2025 Additions of property, plant and equipment Additions of right-of-use assets Additions of intangible assets Depreciation of property, plant and equipment Amortisation of intangible assets Depreciation of right-of-use assets For the year ended December 31, 2024 Additions of property, plant and equipment Additions of right-of-use assets Depreciation of property, plant and equipment Amortisation of intangible assets Depreciation of right-of-use assets
- 67 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
REVENUE AND SEGMENT INFORMATION (Cont’d) Segment information (Cont’d) (d)
Geographical information The Group operated in two geographical areas, Canada and the PRC. The Group’s corporate division located in Canada does not have any revenue and therefore is not presented as an operating segment. During the years ended December 31, 2025 and 2024, the Group’s revenue was generated from gold sales and copper multi-products to customers in the PRC. Approximately 99% (2024: 98%) of non-current assets (excluding equity instruments at FVTOCI) of the Group are located in the PRC.
(e)
Information about major customers Revenue from major customers which accounts for 10% or more of the Group’s total revenue are sales of gold doré bars and copper concentrate including other by-products to CNG and its subsidiaries as disclosed in note 30(a). No third-party customers of the corresponding years contribute over 10% or more of the total sales of the Group.
GENERAL AND ADMINISTRATIVE EXPENSES Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
Administration and office Depreciation of property, plant and equipment Depreciation of right-of-use assets Professional fees Salaries and benefits Others
9,837 7,072 54 4,948 21,344 16,679
6,918 6,867 99 6,492 18,192 8,998
Total general and administrative expenses
59,934
47,566
Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
Penalties on occupation of grasslands Provision for litigation compensation and related interest charge Impairment loss on other non-current assets (note 22) Others
– 15,878 5,879 781
8,739 1,393 – –
Total other expenses
22,538
10,132
OTHER EXPENSES
- 68 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
FINANCE COSTS Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
15,081 848
19,527 66
721 2,747
425 2,811
Less: Amounts capitalised to property, plant and equipment
19,397 (593)
22,829 (439)
Total finance costs
18,804
22,390
Interests on borrowings Interests on lease liabilities Interests on provision of the variable payment arising from the mining right Accretion on environmental rehabilitation (note 28)
Interest has been capitalised at a capitalisation rate representing the weighted average interest to general borrowings.
Capitalisation rate
Year ended December 31, 2025 %
Year ended December 31, 2024 %
1.89
2.07
INCOME TAX EXPENSE/DEFERRED TAXATION The Company was incorporated in Canada and is subject to Canadian federal and provincial tax requirements which are calculated at 27% (2024: 27%) of the estimated assessable profit for the year ended December 31, 2025. PRC Enterprise Income Tax (“EIT”) is calculated at the prevailing tax rate of 25% (2024: 25%) on the estimated taxable profit of the group entities located in the PRC for the year ended December 31, 2025 except as described below.
- 69 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) Pursuant to the Enterprise Income Tax Law (the “EIT” Law) effective on January 1, 2008, Inner Mongolia Pacific Mining Co., Ltd. (“IMP”) is a certified “High and New Technology Enterprise” which is entitled to a preferential tax rate of 15% (2024: 15%) for three years from the year ended December 31, 2024 and eligible for renewal every three years. Such certificate will be expired in December 2027. Pursuant to the Tibet Administration (2022) No. 11 Notice on Provisional Implementation Measures on Enterprise Income Tax (“Notice No.11”), effective on April 29, 2022, Huatailong, which is certified as a “High and New Technology Enterprise” is entitled to preferential tax rate of 15% (2024: 15%) for three years from the year ended December 31, 2024 and eligible for renewal every three years. Such certificate will be expired in December 2027. Additionally, as Huatailong was established in the westward development area of the PRC, it enjoys an exemption from local income tax, which is set to expire on December 31, 2025. As such, Huatailong is entitled to a reduced preferential tax rate of 9% for the years ended December 31, 2025 and 2024. In February 2026, the local policy further extended the preferential tax rate for another 2 years period and will be expired in December 2027. Pursuant to Notice No.11, Metrorkongka County Jiama Industry and Trade Co., Ltd. (“Jiama Industry and Trade”), established in the westward development area of the PRC, employs 70% or more of its employees who are Tibet Permanent Residents and enjoys the exemption on local income tax, thus Jiama Industry and Trade is entitled to a reduced preferential tax rate of 15% for the years ended December 31, 2025 and 2024. Under the EIT Law and Implementation Regulation of the EIT Law, except for the preferential treatments available to certain subsidiaries as mentioned above, other subsidiaries within the Group operating in the PRC are subject to EIT at the statutory rate of 25% during the years ended December 31, 2025 and 2024. Under relevant PRC Tax Law, withholding tax is imposed on dividends declared in respect of profits earned by the PRC subsidiaries from January 1, 2008 onwards. Except the Group has recognised deferred taxation US$23,491,000 (2024: US$3,690,000) on retained profits of the PRC subsidiary of US$234,905,000 (2024: US$36,902,000) for the year ended December 31, 2025, no deferred taxation has been provided for in the consolidated financial statements in respect of temporary differences attributable to accumulated distributable profits of the other PRC subsidiaries amounting to approximately US$1,062,565,000 at December 31, 2025 (2024: US$774,487,000) as the Group is able to control the timing of the reversal of temporary differences and it is probable the temporary differences will not reverse in the foreseeable future. Taxation for other relevant jurisdictions is calculated at the rates prevailing in each of those jurisdictions respectively.
- 70 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) Tax expense comprises:
Current tax: PRC EIT PRC withholding income tax on profit earned from PRC subsidiaries Underprovision in prior year – PRC EIT
Deferred tax: PRC EIT PRC withholding income tax on profit earned from PRC subsidiaries
Total income tax expense
- 71 -
Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
56,719
14,741
7,389 77
2,696 206
64,185
17,643
3,865
6,589
19,800
3,690
23,665
10,279
87,850
27,922
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) The income tax expense for the Group can be reconciled to the profit before income tax for the year as follows:
Profit before income tax PRC EIT tax rates Tax at the PRC EIT tax rates Tax effect of different tax rates of subsidiaries operating in other jurisdictions Tax effect of concessionary tax rate Tax effect of tax losses and other deductible temporary differences not recognised, net Tax effect of non-deductible expenses Tax effect of non-taxable income Impacts on foreign exchange Withholding tax in respect of profit earned from PRC subsidiaries Underprovision of PRC EIT in prior year
- 72 -
Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
560,165
93,220
25%
25%
140,042
23,305
(2,574) (79,790)
(4,841) (13,502)
1,754 1,170 (28) 10 27,189 77
12,669 3,837 (447) 309 6,386 206
87,850
27,922
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) The following are the major deferred tax (assets) liabilities recognised and movements thereon during the current and prior years:
Others US$’000
Distributable profits of subsidiaries US$’000
Total US$’000
8,081 2,219
(3,160) 6,109
– 3,690
101,721 10,279
105,056 (3,916)
10,300 2,869
2,949 4,574
3,690 19,800
112,000 23,665
101,140
13,169
7,523
23,490
135,665
Environmental rehabilitation US$’000
Mining rights (1) US$’000
Inventories US$’000
At January 1, 2024 Charge (credit) to profit or loss
(10,900) 905
107,700 (2,644)
At December 31, 2024 Charge (credit) to profit or loss
(9,995) 338
At December 31, 2025
(9,657)
(1)
Amount represents deferred tax liability arising from the fair value adjustment on mining rights during the business acquisition of Skyland Mining Limited and its subsidiaries (“Skyland”) in December 2010.
For the purpose of presentation in the consolidated statement of financial position, certain deferred tax assets and liabilities have been offset. The following is the analysis of the deferred tax balances for financial reporting purposes:
Deferred tax assets Deferred tax liabilities
- 73 -
2025 US$’000
2024 US$’000
– (135,665)
– (112,000)
(135,665)
(112,000)
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) The Group’s unrecognised deferred income tax assets are as follows: 2025 US$’000
2024 US$’000
Deferred income tax assets Tax losses carry forwards Other deductible temporary differences
30,986 1,656
30,493 1,657
Total unrecognised deferred income tax assets
32,642
32,150
Due to the unpredictability of future profit streams, deferred tax asset of US$30,986,000 (2024: US$30,493,000) has not been recognised in respect of unused tax losses of US$147 million (2024: US$145 million) which are mainly generated from the Company. Under Canadian tax laws, unused tax losses can be carried forward for 20 years if the loss arises in tax years ended after December 31, 2005. Included in unrecognised tax losses are losses of US$82 million that will expire from 2027 to 2045 (2024: US$81 million that will expire from 2027 to 2044). Other losses may be carried forward indefinitely. Other deductible temporary differences of US$2 million (2024: US$2 million) are primarily comprised of share issue costs and cumulative eligible capital expenditures that were incurred by the Company which are tax deductible according to the relevant tax law in Canada. No deferred tax asset has been recognised because the amount of future taxable profit that will be available to realise such assets is unpredictable and not probable. The Group is within the scope of the Pillar Two model rules. The Group will account for the Pillar Two income taxes as current tax when incurred. Pillar Two legislation has been enacted or substantively enacted but not yet in effect as at 31 December 2025 in certain jurisdictions, such as the PRC, in which the Group operates. Potential exposure is assessed based on the information available regarding the financial performance of the Group in the current year. As such, it may not be entirely representative of future circumstances. Based on the assessment, the Group’s effective tax rates in jurisdictions in which it operates are above 15% and the directors of the Company are not currently aware of any circumstances under which they might change. Therefore, the Group does not expect potential exposure to Pillar Two “top-up” taxes. The Group continues to follow Pillar Two legislative developments to evaluate the potential future impact on its financial statements.
- 74 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- PROFIT FOR THE YEAR Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
600
767
Depreciation included in cost of sales and inventories Depreciation included in research and development expenses Depreciation included in general and administrative expenses (note 6)
124,924 2 7,072
114,400 18 6,867
Total depreciation of property, plant and equipment
131,998
121,285
Depreciation included in cost of sales and inventories Depreciation included in general and administrative expenses (note 6)
4,864 54
4,677 99
Total depreciation of right-of-use assets
4,918
4,776
Amortisation of mining rights (included in cost of sales)
29,083
19,906
Loss on disposal of property, plant and equipment
2,369
620
Staff costs Directors’ and chief executive’s emoluments (note 11) Staff salaries and benefits Retirement benefits contributions
310 19,610 1,424
493 16,526 1,173
Total salaries and benefits included in administrative expenses (note 6) Total salaries and benefits included in cost of sales and inventories Total salaries and benefits included in research and development expenses
21,344 63,470
18,192 56,443
2,882
2,340
Total staff costs
87,696
76,975
Bank interest income
(8,705)
(3,114)
Dividend income from equity instrument at FVTOCI
(3,026)
(2,095)
Government grants
(871)
(363)
Allowance for credit losses of trade and other receivables, net Provision for impairment of other non-current assets (note 22)
1,434 5,879
2,051 –
–
291
Profit for the year has been arrived at after charging (crediting): Auditor’s remuneration
Write-down of inventories
- 75 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (a)
Directors’ and chief executive’s emoluments Directors’ and chief executive’s remuneration for the year, disclosed pursuant to the applicable Listing Rules and CO, is as follows: For the year ended December 31, 2025
Fees US$’000
Salaries and other benefits US$’000
Retirement benefits contributions US$’000
Total US$’000
Executive Directors and Chief Executives (Note a) Chenguang Hou
–
–
–
–
Executive Directors (Note b) Na Tian Yuanhui Fu
– –
– 106
– 10
– 116
Non-executive Director (Note c) Wanming Wang
–
–
–
–
Independent Non-executive Directors (Note d) Yingbin Ian He Wei Shao Bielin Shi Ruixia (Rane) Han
53 45 46 46
– – – –
3 1 – –
56 46 46 46
190
106
14
310
- 76 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (Cont’d) (a)
Directors’ and chief executive’s emoluments (Cont’d) For the year ended December 31, 2024
Fees US$’000
Salaries and other benefits US$’000
Retirement benefits contributions US$’000
Total US$’000
Executive Directors and Chief Executives (Note a) Junhu Tong Chenguang Hou
– –
26 –
3 –
29 –
Executive Directors (Note b) Weibin Zhang Na Tian Yuanhui Fu
– – –
148 – 100
9 – 9
157 – 109
Non-executive Director (Note c) Wanming Wang
–
–
–
–
Independent Non-executive Directors (Note d) Yingbin Ian He Wei Shao Bielin Shi Ruixia (Rane) Han
54 46 46 46
– – – –
3 3 – –
57 49 46 46
192
274
27
493
- 77 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (Cont’d) (a)
Directors’ and chief executive’s emoluments (Cont’d) Notes: (a)
Mr. Chenguang Hou was appointed as executive directors and Chief Executive Officer (“CEO”) effective from November 14, 2024. He is employed by CNG and his emolument payments are centralised and made by CNG for the years ended December 31, 2024 and 2025. Mr. Junhu Tong resigned as executive director and CEO effective from August 2, 2024. Mr. Junhu Tong was also employed by CNG and partial of his emolument payments were centralised and made by CNG for the year ended December 31, 2024.
(b)
The executive directors’ emoluments shown above were for their services in connection with the management of the affairs of the Company and the Group. Ms. Na Tian is employed by CNG and her emolument payments are centralised and made by CNG for the years ended December 31, 2024 and 2025. Mr. Weibin Zhang retired as an executive director of the Company with effect from the conclusion of the annual general meeting held on June 26, 2025 (or June 27, 2025 Hong Kong time).
(c)
The non-executive director’s emoluments shown above were mainly for his services as director of the Company.
(d)
The independent non-executive directors’ emoluments shown above were mainly for their services as directors of the Company.
For the years ended December 31, 2025 and 2024, none of the directors of the Company waived or agreed to waive any emoluments.
(b) Five highest paid employees The five highest paid employees included one director (2024: two directors) for the year ended December 31, 2025. The emoluments of the four (2024: three) non-director employees for the year ended December 31, 2025, are as follows:
Employees Salaries and other benefits Retirement benefits contributions
- 78 -
Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
463 19
385 15
482
400
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (Cont’d) (b) Five highest paid employees (Cont’d) The number of the highest paid employees who are not the directors of the Company whose remuneration fell within the following band is as follows: No. of individuals
Nil to HK$1,000,000 (equivalent to approximately US$129,000) HK$1,000,001 to HK$1,500,000 (equivalent to approximately US$129,001 to US$193,000)
2025
2024
2
1
2
2
During the years ended December 31, 2025 and 2024, no emoluments were paid by the Group to the directors of the Company or the five highest paid individuals as an inducement to join or upon joining the Group or as compensation for loss of office.
-
DIVIDEND During the year ended December 31, 2024, a dividend in respect of the year ended December 31, 2024 of US$0.08 per common share (the basic dividend of US$0.05, and the special dividend of US$0.03), in an aggregate amount of US$31,713,000 was declared and paid to the shareholders of the Company upon the approval of the board resolution dated March 26, 2025. Subsequent to the end of the reporting period, a dividend in respect of the year ended December 31, 2025 of US$0.47 per common share, in an aggregate amount of US$186,785,121, has been declared by the directors of the Company upon the approval of the board resolution dated March 30, 2026.
-
EARNINGS PER SHARE Profit used in determining earnings per share are presented below:
Profit attributable to owners of the Company for the purposes of basic earnings per share (US$’000) Weighted average number of common shares, basic Basic earnings per share (US cents)
Year ended December 31, 2025
Year ended December 31, 2024
466,959
62,732
396,413,753
396,413,753
117.80
15.82
The Group had no outstanding potential dilutive instruments issued as at December 31, 2025 and 2024 and during the years ended December 31, 2025 and 2024. Therefore, diluted earnings per share is the same as the basic earnings per share.
- 79 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- CASH AND CASH EQUIVALENTS/RESTRICTED BALANCES/TERM DEPOSITS Cash and cash equivalents of the Group are comprised of cash on hand and bank balances. The Group’s cash and cash equivalents, restricted balances and term deposits denominated in the foreign currencies other than the respective group entities’ functional currencies are presented below:
Denominated in: Canadian dollars Renminbi (“RMB”) US$ Hong Kong dollars
December 31, 2025 US$’000
December 31, 2024 US$’000
179 346,538 – 4,801
129 170,392 3 4,227
351,518
174,751
The bank balances carry interest rates ranging from 0.05% to 1.485% (2024: 0.001% to 2.95%) per annum. Restricted balances carry interest at market rates ranging from 0.05% to 0.10% (2024: 0.35% to 1.15%) per annum. Included in the restricted balance as at December 31, 2025 and 2024, are cash held in designated bank accounts restricted for mine reclamation and environmental rehabilitation purposes as required by government regulations, certain amounts represents deposits that have been frozen by the Intermediate People’s Court of Lhasa City, Tibet (“Tibet Intermediate Court”) in relation to the litigations involved by Huatailong. Details of litigations are set out in note 31(i). As at December 31, 2025, term deposits carry interest at fixed market rates ranging from 1.15% to 1.7% (2024: 1.5% to 2.0%) per annum. The Group’s term deposits represent deposits held in a CNG subsidiary denominated in RMB with original maturities over three months and redeemable on maturity. The Group maintains deposits with China National Gold Group Finance Company Limited (“China Gold Finance”), a subsidiary of CNG, which is a related party. China Gold Finance holds a financial institution licence and provides financial services exclusively to subsidiaries and associates of CNG. These deposits are unsecured, interest-bearing at rates that are considered to be comparable to prevailing market rates, and are cashable on demand or repayable at their stated maturity. Further details are disclosed in Note 30 (a) to the consolidated financial statements.
- 80 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- TRADE AND OTHER RECEIVABLES
Trade receivables Less: allowance for credit losses
Amounts due from related companies (note 30(a)) Other receivables(2)
(1)
Total trade and other receivables
December 31, 2025 US$’000
December 31, 2024 US$’000
2,111 (344)
2,473 (180)
1,767 2,762 3,717
2,293 1,583 3,517
8,246
7,393
At January 1, 2024, trade receivables from contracts with customers amounted to US$1,466,000. (1)
The amounts are unsecured, interest free and repayable on demand.
(2)
Included in the balance as at December 31, 2025 and 2024 are Tax and Other Surcharges (as defined in note 22) with carrying amount of nil (2024: US$1,270,000), net of allowance for credit losses, to be recovered from Zhongxinfang Tibet Construction Investment Co. Ltd. (“Zhongxinfang”), an independent third party property developer. As detailed disclosed in Note 31(i)(c).
Based on the best available information to the Group and the credit risk assessment of Zhongxinfang as of December 31, 2025, expected credit loss of RMB9,131,000 (equivalent to US$1,270,000) (2024: RMB13,697,000 (equivalent to US$1,923,000) for the Tax and Other Surcharge from Zhongxinfang are recognised, and the accumulated allowance for credit losses is RMB45,655,000 (equivalent to US$6,351,000) as of December 31, 2025 (2024: RMB36,524,000 (equivalent to US$5,081,000)). The Group allows an average credit period of 30 days and 180 days to its trade customers. Below is an aged analysis of trade receivables (net of allowance for credit losses) presented based on invoice dates, which approximated the respective revenue recognition dates, at the end of the reporting period:
Less than 30 days 31 to 90 days 91 to 180 days Over 180 days Total trade receivables
December 31, 2025 US$’000
December 31, 2024 US$’000
714 241 3 809
819 130 276 1,068
1,767
2,293
In determining the recoverability of a trade receivable, the Group considers any change in the credit quality of the trade receivable from the date credit was initially granted up to the reporting date.
- 81 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- PREPAID EXPENSES AND DEPOSITS
Deposit for acquisition of land use right (Note a) Deposit for water treatment project Deposit paid for acquisition of property, plant and equipment (Note b) Other prepayment and deposits
Less: A mounts that will be settled or utilised within one year shown under current assets Amounts that will be settled or utilised for more than one year shown under non-current assets
December 31, 2025 US$’000
December 31, 2024 US$’000
– – 74 1,794
23,906 6,017 172 1,513
1,868
31,608
(1,794)
(1,513)
74
30,095
Notes: a.
The amounts comprised cost of land use right, grassland compensation fee paid to government authorities and relocation compensation fees paid to pastoralists, which are related to the acquisition of a land use right for the Phase III tailings dam construction project in Jiama Mine. During the year, the acquisition of land used rights was completed the relevant deposits paid was transferred to right of use assets.
b.
The amount represents deposits paid to third party contractors for the acquisition of property, plant and equipment to expand the Group’s mining capacity in Tibet, the PRC. The amount is shown as non-current asset.
- 82 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- INVENTORIES December 31, 2025 US$’000
December 31, 2024 US$’000
Gold in process Gold doré bars Consumables Copper concentrate Spare parts
249,498 8,283 9,713 5,017 22,025
222,568 26,467 11,119 5,959 24,292
Total inventories
294,536
290,405
Inventories totalling US$620,578,000 (2024: US$464,027,000) for the year ended December 31, 2025 was recognised in cost of sales.
- RIGHT-OF-USE ASSETS Leasehold lands US$’000
Leased equipment US$’000
Leased properties US$’000
Total US$’000
At December 31, 2025 Carrying amount
103,949
391
179
104,519
At December 31, 2024 Carrying amount
45,031
899
27
45,957
For the year ended December 31, 2025 Depreciation charge
4,441
420
57
4,918
For the year ended December 31, 2024 Depreciation charge
4,208
469
99
4,776
- 83 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- RIGHT-OF-USE ASSETS (Cont’d) Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
Total cash outflow for leases (Note)
21,161
35,722
Additions to right-of-use assets
63,154
11,217
For both years, the Group leases leasehold lands, equipment and office premises for its operations. The lease terms of leasehold lands are 2 years to in perpetuity (2024: 2 years to in perpetuity). Lease contracts of office premises and equipment are entered into for a fixed term of 5 years (2024: 5 years). Lease terms are negotiated on an individual basis and contain a wide range of different terms and conditions. In determining the lease term and assessing the length of the non-cancellable period, the Group applies the definition of a contract and determines the period for which the contract is enforceable. The Group obtained several land use right certificates for leasehold lands where its mining facilities are primarily located. Lump sum payments were made upfront to acquire these leasehold lands. The leasehold lands are presented separately. Note: The amount that the Group paid to government authorities and pastoralists of during the year ended 31 December 2024 of US$23,906,000 as a deposit for acquisition of land use right is included in the total cash outflow for leases for the year ended 31 December 2024.
The Group depreciated the leasehold lands using the straight-line method over the estimated useful lives of the leasehold land.
Restrictions or covenants on leases In addition, lease liabilities of US$12,584,000 (2024: US$928,000) are recognised with related right-of-use assets of US$13,458,000 (2024: US$926,000) as at December 31, 2025. The lease agreements do not impose any covenants other than the security interests in the leased assets that are held by the lessor. Leased assets may not be used as security for borrowing purposes.
- 84 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- EQUITY INSTRUMENTS AT FVTOCI
Listed investments: Equity securities listed in Hong Kong (Note a) Unlisted investments: Equity securities (Note b) Total
December 31, 2025 US$’000
December 31, 2024 US$’000
133,678
47,599
197
812
133,875
48,411
Note: a.
The above investments represent 2.03% equity interest in ordinary shares of China Nonferrous Mining Corporation Limited (“CNMC”), an entity listed in Hong Kong and is principally engaged in mining, processing and trading of nonferrous metals in Zambia. These investments are not held for trading, instead, they are held for long-term strategic purposes. The directors of the Company have elected to designate these investments in equity instruments as at FVTOCI as they believe that recognising short-term fluctuations in these investments’ fair value in profit or loss would not be consistent with the Group’s strategy of holding these investments for long-term purposes and realising their performance potential in the long run. During the year ended December 31, 2025, a fair value gain of US$86,079,000 (2024: US$1,271,000) was recognised in other comprehensive income and accumulated under the heading of investments revaluation reserve in accordance with the Group’s accounting policies.
b.
The above unlisted equity investments represent 7.425% (2024: 7.425%) share interest in Tibet Zhongjin Xinlian Demolition Engineering Co. Ltd. (“Tibet Zhongjin Xinlian”) and 4% share interest in Tibet Electric Power Trading Center Co., Ltd. (“Tibet Electric”). Tibet Zhongjin Xinlian is established in the PRC and principally engaged in the development and manufacturing of explosives. Tibet Electric is established in the PRC and is principally engaged in the trading of electric power in the PRC. The directors of the Company have elected to designate these investments in equity instruments as at FVTOCI as they believe that recognising short-term fluctuations in these investments’ fair value in profit or loss would not be consistent with the Group’s strategy of holding these investments for long-term purposes and realising their performance potential in the long run. During the year, a fair value loss of unlisted investments of USD615,000 (2024: Nil) was recognised in other comprehensive income and accumulated under the heading of investments revaluation reserve in accordance with the Group’s accounting policies. As at December 31, 2025, the fair value of the unlisted equity investments are RMB1,385,000 (approximately US$197,000) (2024: RMB5,838,000 (approximately US$812,000)),
- 85 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- PROPERTY, PLANT AND EQUIPMENT
Buildings US$’000
Crushers US$’000
Furniture and office equipment US$’000
516,370 1,502 115,345
227,332 – –
15,582 2,677 –
311,738 5,010 –
11,728 8 –
98 – –
1,419,318 14,048 31
125,711 11,093 (115,376)
2,627,877 34,338 –
– (997) (8,257)
– – –
– (37) (195)
– (2,336) (3,787)
– – (123)
– – –
(9) – (12,787)
– – (878)
(9) (3,370) (26,027)
At December 31, 2024 Additions Transfer from CIP Environmental rehabilitation adjustment (note 28) Disposals Exchange realignment
623,963 1,791 10,169
227,332 – –
18,027 3,785 113
310,625 5,608 –
11,613 1,790 –
98 – –
1,420,601 8,696 –
20,550 29,059 (10,282)
2,632,809 50,729 –
– – 13,727
– – –
– (142) 365
– (21) 5,868
– (550) 208
– – –
20,249 (2,098) 18,670
– – 701
20,249 (2,811) 39,539
At December 31, 2025
649,650
227,332
22,148
322,080
13,061
98
1,466,118
40,028
2,740,515
ACCUMULATED DEPRECIATION At January 1, 2024 Provided for the year Eliminated on disposals Exchange realignment
(173,213) (30,023) 545 2,509
(187,449) (14,054) – –
(9,562) (1,653) 3 113
(186,509) (18,044) 2,202 2,170
(7,688) (862) – 81
(98) – – –
(581,457) (56,649) – 2,327
– – – –
(1,145,976) (121,285) 2,750 7,200
At December 31, 2024 Provided for the year Eliminated on disposals Exchange realignment
(200,182) (44,404) – (4,775)
(201,503) (658) – –
(11,099) (3,626) 16 (237)
(200,181) (16,959) 9 (3,676)
(8,469) (1,930) 405 (156)
(98) – – –
(635,779) (64,421) – (3,345)
– – – –
(1,257,311) (131,998) 430 (12,189)
At December 31, 2025
(249,361)
(202,161)
(14,946)
(220,807)
(10,150)
(98)
(703,545)
–
(1,401,068
CARRYING VALUE At December 31, 2025
400,289
25,171
7,202
101,273
2,911
–
762,573
40,028
1,339,447
At December 31, 2024
423,781
25,829
6,928
110,444
3,144
–
784,822
20,550
1,375,498
COST At January 1, 2024 Additions Transfer from CIP Environmental rehabilitation adjustment (note 28) Disposals Exchange realignment
Machinery and equipment US$’000
Motor Leasehold vehicles improvements US$’000 US$’000
Mineral assets US$’000
Construction in progress (“CIP”) US$’000
Total US$’000
- 86 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- PROPERTY, PLANT AND EQUIPMENT (Cont’d) Except for mineral assets and construction in progress, the above items of property, plant and equipment, taking into account the residual value, are depreciated using the straight-line method over the estimated useful lives of the related assets as follows: Buildings Crushers Furniture and office equipment Machinery and equipment Motor vehicles Leasehold improvements
(a company incorporated under the laws of British Columbia, Canada with limited liability) (Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
RESULTS ANNOUNCEMENT FOR THE YEAR ENDED DECEMBER 31, 2025 FINANCIAL HIGHLIGHTS For the Year ended December 31, 2025 2024 US$’000 US$’000 Revenues Net profit Basic earnings per share (cents) Diluted earnings(loss) per share (cents)
1,310,125 472,315 117.80 N/A
756,646 65,298 15.82 N/A
Net cash flows from operations Property, plant and equipment Property, plant and equipment capital expenditures Cash and cash equivalents Working capital
709,984 1,339,447 50,136 399,402 580,005
306,896 1,375,498 48,286 183,779 326,988
RESULTS The board of directors (the“Board”) of China Gold International Resources Corp. Ltd. (the “Company” together with its subsidiaries, referred hereto as the “Group”) is pleased to announce the audited consolidated results of the Group for the year ended December 31, 2025 with comparative figures for the comparable period in 2024, as follows:
-1-
MANAGEMENT’S DISCUSSION AND ANALYSIS
The following Management Discussion and Analysis of financial condition and results of operations (“MD&A”) is prepared as of March 30, 2026. It should be read in conjunction with the consolidated financial statements and notes thereto of China Gold International Resources Corp. Ltd. (referred to herein as “China Gold International”, the “Company”, “we” or “our” as the context may require) for the three months and year ended December 31, 2025 and the three months and year ended December 31, 2024, respectively. Unless the context otherwise provides, references in this MD&A to China Gold International or the Company refer to China Gold International and each of its subsidiaries collectively on a consolidated basis. The following discussion contains certain forward-looking statements relating to the Company’s plans, objectives, expectations and intentions, which are based on the Company’s current expectations and are subject to risks, uncertainties and changes in circumstances. Readers should carefully consider all of the information set out in this MD&A, including the risks and uncertainties outlined further in the Company’s Annual Information Form (“Annual Information Form” or “AIF”) dated March 30, 2026 on SEDAR+ at www.sedarplus.ca, www.chinagoldintl.com and www.hkex.com.hk. For further information on risks and other factors that could affect the accuracy of forward-looking statements and the result of operations of the Company, please refer to the sections titled “Forward-Looking Statements” and “Risk Factors” and to discussions elsewhere within this MD&A. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks.
-2-
MANAGEMENT’S DISCUSSION AND ANALYSIS
FORWARD-LOOKING STATEMENTS Certain statements made herein, other than statements of historical fact relating to the Company, represent forward-looking information. In some cases, this forward-looking information can be identified by words or phrases such as “may”, “will”, “expect”, “anticipate”, “contemplates”, “aim”, “estimate”, “intend”, “plan”, “believe”, “potential”, “continue”, “is/are likely to”, “should” or the negative of these terms, or other similar expressions intended to identify forward-looking information. This forward-looking information includes, among other things; China Gold International’s production estimates, business strategies and capital expenditure plans; the development and expansion plans and schedules for the CSH Mine and the Jiama Mine; China Gold International’s financial condition; the regulatory environment as well as the general industry outlook; general economic trends in China; and statements respecting anticipated business activities, planned expenditures, corporate strategies, participation in projects and financing, and other statements that are not historical facts. By their nature, forward-looking information involves numerous assumptions, both general and specific, which may cause the actual results, performance or achievements of China Gold International and/or its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward–looking information. Some of the key assumptions include, among others, the absence of any material change in China Gold International’s operations or in foreign exchange rates, the prevailing price of gold, copper and other non-ferrous metal products; the absence of lowerthan-anticipated mineral recovery or other production problems; effective income and other tax rates and other assumptions underlying China Gold International’s financial performance as stated in the Company’s technical reports for its CSH Mine and Jiama Mine; China Gold International’s ability to obtain regulatory confirmations and approvals on a timely basis; continuing positive labor relations; the absence of any material adverse effects as a result of political instability, terrorism, natural disasters, pandemics such as COVID-19, litigation or arbitration and adverse changes in government regulation; the availability and accessibility of financing to China Gold International; and the performance by counterparties of the terms and conditions of all contracts to which China Gold International and its subsidiaries are a party. The forward-looking information is also based on the assumption that none of the risk factors identified in this MD&A or in the AIF that could cause actual results to differ materially from the forward-looking information actually occurs. Forward-looking information contained herein as of the date of this MD&A is based on the opinions, estimates and assumptions of management. There are a number of important risks, uncertainties and other factors that could cause actual actions, events or results to differ materially from those described as forward-looking information. China Gold International disclaims any obligation to update any forward-looking information, whether as a result of new information, estimates, opinions or assumptions, future events or results, or otherwise except to the extent required by law. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking information in this MD&A is expressly qualified by this cautionary statement. The reader is cautioned not to place undue reliance on forward-looking information.
-3-
MANAGEMENT’S DISCUSSION AND ANALYSIS
THE COMPANY Overview China Gold International is a gold and base metal mining company registered in British Columbia, Canada. The Company’s main business involves the operation, acquisition, development and exploration of gold and base metal properties. The Company’s principal mining operations are the Chang Shan Hao Gold Mine (“CSH Mine” or “CSH”), located in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine (“Jiama Mine” or “Jiama”), located in Tibet, China. China Gold International holds a 96.5% interest in the CSH Mine, while its Chinese joint venture (“CJV”) partner holds the remaining 3.5% interest. The Company owns a 100% interest in the Jiama Mine, which hosts a large scale copper-gold polymetallic deposit containing copper, gold, molybdenum, silver, lead and zinc metals. China Gold International’s common shares are listed on the Toronto Stock Exchange (“TSX”) and The Stock Exchange of Hong Kong Limited (“HKSE”) under the symbol CGG and the stock code 2099, respectively. Additional information about the Company, including the Company’s Annual Information Form, is available on SEDAR+ at sedarplus.ca as well as Hong Kong Exchange News at hkexnews.hk.
-4-
MANAGEMENT’S DISCUSSION AND ANALYSIS
Performance Highlights Three months ended December 31, 2025 •
Revenue increased by 31% to US$384.7 million from US$293.6 million for the same period in 2024.
•
Mine operating earnings of US$209.9 million, increased by US$87.7 million from mine operating earnings of US$122.2 million for the same period in 2024.
•
Net profit of US$127.7 million increased by US$59.4 million from US$68.3 million for the same period in 2024.
•
Cash flow from operation of US$140.4 million, increased from US$62.7 million for the same period in 2024.
•
Total gold production decreased by 21% to 47,875 ounces from 60,406 ounces for the same period in 2024.
•
Total copper production was 37.0 million pounds (approximately 16,756 tonnes) a decrease from 44.1 million pounds (approximately 20,020 tonnes) for the same period in 2024.
-5-
MANAGEMENT’S DISCUSSION AND ANALYSIS
Year ended December 31, 2025 •
Revenue increased by 73% to US$1,310.1 million from US$756.6 million for the same period in 2024.
•
Mine operating earnings of US$684.0 million, increased by US$497.1 million from US$186.9 million for the same period in 2024.
•
Net profit of US$472.3 million increased by US$407.0 million from US$65.3 million for the same period in 2024.
•
Cash flow from operation of US$710.0 million, increased from US$306.9 million for the same period in 2024.
•
Total gold production increased by 9% to 177,225 ounces from 162,652 ounces for the same period in 2024.
•
Total copper production was 156.3 million pounds (approximately 70,883 tonnes) a 48% increase from 105.7 million pounds (approximately 47,929 tonnes) for the same period in 2024.
Selected Annual Information* Year ended December 31 2024 2023
2022
2021
757 123 65 15.82 N/A 2,936 809
1,105 317 225 56.19 N/A 3,195 653
1,137 333 269 67.44 N/A 3,257 1,080
2025
US$ Millions except for per share Total revenue Income from operations Net profit (loss) Basic earnings (loss) per share (cents) Diluted earnings (loss) per share (cents) Total assets Total non-current liabilities *
1,310 590 472 117.80 N/A 3,357 555
Prepared under IFRS
-6-
459 32 (23) (6.43) N/A 2,835 802
MANAGEMENT’S DISCUSSION AND ANALYSIS
OUTLOOK After the repairs and reinforcements of the overflow of the Guolanggou Tailings Dam, the Government of Tibet Autonomous Region and relevant departments of the central government approved the resumption of Jiama’s operations on May 30, 2024, with a daily processing capacity of 34,000 tonnes, which is lower than the design processing capacity. The Company is actively advancing the construction of the Phase III tailings pond, which is expected to be completed and put into operation in the first half of 2027. The total daily processing capacity is anticipated to increase to 44,000 tpd once the Phase III tailings pond is in operation. The open-pit operations at the CSH gold mine are nearing the end of its mine life. With the CSH pit’s increased depth, the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. Ensuring slope stability and avoiding systematic risks at this stage are the Company’s top priority to ensure safe and sustainable production. Inconsideration of the events, the Company reports separate production guidance for the two mines in 2026.
CSH Mine: •
The total gold production is estimated between 70,732 ounces (2.2 tonnes) and 83,592 ounces (2.6 tonnes).
Jiama Mine: •
The copper production will be approximately between 140 million pounds (63,500 tonnes) and 149 million pounds (67,500 tonnes);
•
The gold production will be approximately between 70,732 ounces (2.2 tonnes) and 75,554 ounces (2.35 tonnes);
•
The silver production will be approximately between 4.18 million ounces (130 tonnes) and 4.82 million ounces (150 tonnes);.
-7-
MANAGEMENT’S DISCUSSION AND ANALYSIS
Outline of the Long-Term Development Plan for the Jiama Mine In 2024, the Company successfully restored stable operation at the Jiama Mine. In addition, the Company continued to focus its efforts on optimizing resource utilization plan, integrating the identified high-grade underground resources, and accelerating the exploration work at high potential zones. The long-term development plan for the Jiama Mine consists of three phases: •
Prior to the completion of the construction of the new tailings storage facility (the “Youlongbu tailings storage facility”), the Jiama Mine Phase II processing plant will maintain and operate at its current processing capacity of 34,000 tons per day to match the Guolanggou’s storage capacity (the operation of Phase I processing plant has been suspended since May 2024).
•
The Youlongbu tailings storage facility is scheduled to commence operation in 2027, allowing a further increase in the Jiama Mine’s production capacity. Over the next two years, as part of the underground resource integration plan, the Company plans to apply to increase the permitted capacity on its mining license for the Jiama Mine, subject to compliance with the relevant safety requirements. Currently, the permitted capacity on the mining license of the Jiama Mine is 14.4 million tonnes per year (approximately 44,000 tonnes per day based on 330 operating days per year). Subject to the government approval of an increased annual mining rate, and following the commissioning of Youlongbu tailings storage facility, the Jiama Mine’s ore processing volume will return to the level of 50,000 tonnes per day, in line with the designed processing capacity of the processing plants. In addition, endeavors are underway so that the production levels at the Jiama Mine will restore to those before the Guolanggou tailings overflow through blending of high-grade underground ores.
•
The Company is also working to delineate new resources at satellite deposits near the Jiama Mine. The Company has been actively conducting geological exploration work in two areas: the Bayi Ranch and the Zegulang North, both of which have shown significant resource potential. The Company will provide an update on the exploration progress and results in due course. Subject to the final exploration outcomes and feasibility studies on resource development, the Company will formulate a comprehensive expansion plan for the Jiama Mine area. This study has already been initiated at a preliminary stage.
-8-
MANAGEMENT’S DISCUSSION AND ANALYSIS
RESULTS OF OPERATIONS Selected Quarterly Financial Data Quarter ended (US$ in thousands except per share)
31-Dec
2025 30-Sep
Revenue Cost of sales Mine operating earnings (loss) General and administrative expenses Exploration and evaluation expenditures Research and development expenses Income (loss) from operations Foreign exchange gain (loss) Finance costs Profit (loss) before income tax Income tax expense (credit) Net profit (loss) Basic earnings (loss) per share (cents) Diluted earnings per share (cents)
384,734 174,826 209,908 21,450 268 16,399 171,791 7,381 4,511 171,694 43.994 127,699 31.67 N/A
345,026 147,993 197,033 14,184 224 7,848 174,777 (3,039) 4,711 153,450 11,156 142,294 35.60 N/A
30-Jun
31-Mar
307,269 147,872 159,397 12,068 133 5,256 141,940 (2,037) 4,580 139,252 22,909 116,343 29.08 N/A
273,096 155,444 117,653 12,232 508 3,296 101,617 (2,654) 5,002 95,770 9,791 85,979 21.45 N/A
31-Dec
2024 30-Sep
30-Jun
31-Mar
293,567 171,413 122,154 17,877 247 8,118 95,912 (4,631) 5,313 85,540 17,223 68,317 16.97 N/A
254,581 207,762 46,819 9,944 49 4,704 32,122 2,670 5,692 30,166 2,293 27,873 6.84 N/A
147,955 118,512 29,443 10,649 50 2,113 16,631 (443) 5,722 3,924 8,768 (4,844) (1.36) N/A
60,543 72,039 (11,496) 9,096 92 787 (21,471) (157) 5,663 (26,410) (362) (26,048) (6.63) N/A
Selected Quarterly and Annual Production Data and Analysis CSH Mine
Three months ended December 31, 2025 2024 98.21 4,124 28,684 23,814 1,747 1,521
Gold sales (US$ million) Realized average price (US$) of gold per ounce Gold produced (ounces) Gold sold (ounces) Total production cost (US$ per ounce) Cash production cost(1) (US$ per ounce) (1)
78.80 2,659 36,719 29,641 1,721 1,306
Year ended December 31, 2025 2024 338.47 3,419 96,816 99,010 1,665 1,263
246.95 2,453 108,188 100,682 1,645 1,064
Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A
Gold production at the CSH Mine decreased by 22% to 28,684 ounces for the three months ended December 31, 2025 compared to 36,719 ounces for the same period in 2024. The total production cost of gold for the three months ended December 31, 2025 increased to US$1,747 per ounce compared to US$1,721 for the same period in 2024. The cash production cost of gold for the three months ended December 31, 2025 increased to US$1,521 per ounce from US$1,306 for the same period in 2024. The increase in Cash production cost is mainly due to the increase in environment protection fees.
-9-
MANAGEMENT’S DISCUSSION AND ANALYSIS
Jiama Mine
Copper sales (US$ in millions) Realized average price1 (US$) of copper per pound after smelting fee discount Copper produced (tonnes) Copper produced (pounds) Copper sold (tonnes) Copper sold (pounds) Gold produced (ounces) Gold sold (ounces) Silver produced (ounces) Silver sold (ounces) Lead produced (tonnes) Lead produced (pounds) Lead sold (tonnes) Lead sold (pounds) Zinc produced (tonnes) Zinc produced (pounds) Zinc sold (tonnes) Zinc sold (pounds) Moly produced (tonnes) Moly produced (pounds) Moly sold (tonnes) Moly sold (pounds) Total production cost2 (US$) of copper per pound Total production cost2 (US$) of copper per pound after by-products credits4 Cash production cost4 (US$) per pound of copper Cash production cost3 (US$) of copper per pound after by-products credits4 1
Three months ended December 31, 2025 2024
Year ended December 31, 2025 2024
148.99
106.16
495.56
283.22
3.80 16,756 36,939,257 17,652 38,917,010 19,191 20,195 1,275,143 1,346,956 7,973 17,577,968 8,451 18,632,143 5,248 11,569,321 5,536 12,205,513 138 303,944 134 295,027 4.36
2.42 20,020 44,135,873 19,931 43,940,061 23,688 23,520 1,479,708 1,473,027 13,503 29,768,128 13,360 29,453,697 6,575 14,495,121 6,479 14,282,878 120 264,753 234 515,217 3.31
3.17 70,883 156,269,659 70,959 156,437,873 80,409 80,406 5,645,915 5,648,631 40,912 90,196,257 41,036 90,468,423 23,446 51,688,429 23,556 51,932,904 768 1,692,167 840 1,851,486 3.52
2.71 47,929 105,664,184 47,421 104,545,457 54,464 53,963 3,231,408 3,193,073 27,896 61,500,340 27,493 60,612,685 14,663 32,326,595 14,442 31,839,913 354 780,704 234 515,217 4.44
0.88 3.63
0.89 2.65
0.52 2.74
2.32 3.62
0.14
0.23
(0.26)
1.50
A discount factor of 11.9% to 25.3% is applied to the copper benchmark price to compensate the refinery costs incurred by the buyers. The discount factor is higher if the grade of copper in copper concentrate is below 18%. The industry standard of copper in copper concentrate is between 18-20%.
2
Production costs include expenditures incurred at the mine sites for the activities related to production including mining, processing, mine site G&A and royalties etc.
3
Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A
4
By-products credit refers to the sales of gold, silver, lead, zinc and moly during the corresponding period.
5
Increased production of by-products combined with reduced G&A and R&D costs, has resulted in by-product credits exceeding total production cost of copper.
- 10 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
During the three months ended December 31, 2025, The Jiama Mine produced 16,756 tonnes (approximately 37.0 million pounds) of copper, which decreased from of 20,020 tonnes (approximately 44.1 million pounds) during the comparative three month period in 2024. Total production cost of copper per pound increased by 32% due to lower copper grade and increase of R&D in the three months of 2025 as compared to the same period in 2024. Cash production cost of copper per pound increased as compared to the same quarter in 2024. However, total production cost of copper per pound after by-products and cash production cost of copper per pound after by-product decreased in 2025 as compared to the same three month period in 2024, mainly due to higher by-product revenue from gold and silver.
Review of Quarterly and Annual Data Three months ended December 31, 2025 compared to three months ended December 31, 2024 Revenue of US$384.7 million for the fourth quarter of 2025, increased by US$91.1 million from US$293.6 million for the same period in 2024. Revenue from the CSH Mine was US$98.2 million, an increase of US$19.4 million from US$78.8 million for the same period in 2024. The realized average gold price increased by 55%, from US$2,659/oz in Q4 2024 to US$4,124/oz in Q4 2025. Gold sold by the CSH Mine was 23,814 ounces (gold produced: 28,684 ounces), compared to 29,641 ounces (gold produced: 36,719 ounces) for the same period in 2024. Revenue from the Jiama Mine was US$286.5 million, an increase of US$71.7 million, compared to US$214.8 million for the same period in 2024. The realized average price of copper increased by 57%, from US$2.42/pound in Q4 2024 to US$3.80/pound in Q4 2025. Total copper sold was 17,652 tonnes (38.9 million pounds) for the three months ended December 31, 2025, a decrease of 11% from 19,931 tonnes (43.9 million pounds) for the same period in 2024. Cost of sales of US$174.8 million for the quarter ended December 31, 2025, a slightly increase of US$3.4 million from US$171.4 million for the same period in 2024. Cost of sales as a percentage of revenue for the Company decreased from 58% to 45% for the three months ended December 31, 2024 and 2025, respectively. Cost of sales was impacted by many operation factors such as grade of ore, recovery rates and stripping ratio. Refer to the sections below for details of production factors for each individual mine. Mine operating earnings of US$209.9 million for the three months ended December 31, 2025, an increase of US$87.7 million from US$122.2 million for the same period in 2024. General and administrative expenses increased by US$3.5 million, from US$17.9 million for the quarter ended December 31, 2024 to US$21.4 million for the quarter ended December 31, 2025, partially due to higher taxes and surcharges resulting from increased revenue in the current quarter. Research and development expenses of US$16.4 million for the three months ended December 31, 2025, increased from US$8.1 million for the comparative 2024 period. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes. Income from operations of US$171.8 million for the fourth quarter of 2025, increased by US$75.9 million, compared to US$95.9 million for the same period in 2024. Foreign exchange gain of US$7.4 million for the three months ended December 31, 2025, increased from a loss of US$4.6 million for the same period in 2024. The gain was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB.
- 11 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Interest and other income of US$2.4 million for the three months ended December 31, 2025, increased from a negative US$0.1 million for the same period in 2024, primarily due to higher interest income earned during the current quarter compared to the corresponding period last year. Finance costs of US$4.5 million for the three months ended December 31, 2025, decreased by US$0.8 million compared to US$5.3 million for the same period in 2024. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Other expense of US$5.3 million for the three months ended December 31, 2025, increased from US$0.3 million for the same period in 2024. During the current quarter, the Company recognized an impairment loss of U$5.9 million on other non-current assets based on a third-party real estate valuation report, partially offset by lower expenses in other categories. Refer to Note 22 Other non-current assets of the consolidated financial statements for details. Income tax expense of US$44.0 million for the three months ended December 31, 2025, increased by US$26.8 million from US$17.2 million for the comparative period in 2024. In December 2025, the Company accrued US$23.5 million in withholding tax on declared dividends to shareholders. During the current quarter, the Company had US$25.0 million of deferred tax expense compared to US$9.1 million deferred tax credit for the same period in 2024. Net income of US$127.7 million for the three months ended December 31, 2025, increased by US$59.4 million from US$68.3 million for the three months ended December 31, 2024.
Year ended December 31, 2025 compared to year ended December 31, 2024 Revenue of US$1,310.1 million for the year ended December 31, 2025, increased by US$553.5 million from US$756.6 million for the same period in 2024. Revenue from the CSH Mine was US$338.5 million, an increase of US$91.6 million from US$246.9 million for the same period in 2024. The realized average gold price increased by 39%, from US$2,453/oz in 2024 to US$3,419/oz in the same period of 2025. Gold sold by the CSH Mine was 99,010 ounces (gold produced: 96,816 ounces), compared to 100,682 ounces (gold produced: 108,188 ounces) for the same period in 2024. Revenue from the Jiama Mine was US$971.7 million, an increase of US$462.0 million, compared to US$509.7 million for the same period in 2024. The realized average price of copper increased by 17%, from US$2.71/pound in 2024 to US$3.17/pound in the same period of 2025. Total copper sold was 70,959 tonnes (156.4 million pounds) for the year ended December 31, 2025, an increase of 50% from 47,421 tonnes (104.5 million pounds) for the same period in 2024. Cost of sales of US$626.1 million for the year ended December 31, 2025, an increase of US$56.4 million from US$569.7 million for the same period in 2024. The cost of sales increased due to the resumption of operations at the Jiama Mine, leading to higher production costs as the Phase II processing plants was reactivated. Mine operating earnings of US$684.0 million for the year ended December 31, 2025, an increase of US$497.1 million from US$186.9 million for the same period in 2024. General and administrative expenses increased by US$12.3 million, from US$47.6 million for the year ended December 31, 2024 to US$59.9 million for the same period in 2025, primarily driven by higher operational support costs associated with the resumption of production at the Jiama Mine. Research and development expenses of US$32.8 million for the year ended December 31, 2025, increased from US$15.7 million for the comparative 2024 period. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes.
- 12 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Income from operations of US$590.1 million for the year ended December 31, 2025, increased by US$466.9 million, compared to US$123.2 million for the same period in 2024. Foreign exchange loss of US$0.3 million for the year ended December 31, 2025, decreased from US$2.6 million for the same period in 2024. The loss was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB. Interest and other income of US$11.7 million for the year ended December 31, 2025, increased from US$5.1 million for the same period in 2024, primarily due to higher interest income earned during the current period and higher dividend received from China Nonferrous Mining Corporation Limited compared to the corresponding period last year. Finance costs of US$18.8 million for the year ended December 31, 2025, decreased by US$3.6 million compared to US$22.4 million for the same period in 2024. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Other expense of US$22.5 million for the year ended December 31, 2025, increased from US$10.1 million for the same period in 2024. During the current period, the Company recognized litigation compensation of US$15.0 million arising from the litigation between Shaanxi Xiaoshanchuan Mineral Resources Development and Construction Co.,Ltd. and the Company’s subsidiary, Tibet Huatailong Mining Development Co. Ltd. Refer to Note 31 Contingencies of the consolidated financial statements for details. Income tax expense of US$87.9 million for the year ended December 31, 2025, increased by US$60.0 million from US$27.9 million for the comparative period in 2024. In December 2025, the Company accrued US$23.5 million in withholding tax on declared dividends to shareholders. During the current period, the Company had US$23.7 million of deferred tax expense compared to a deferred tax expense of US$10.3 million for the same period in 2024. Net income of US$472.3 million for the year ended December 31, 2025, increased by US$407.0 million from US$65.3 million for the same period in 2024.
NON-IFRS MEASURES The cash cost of production, cash cost after by-product credits and cash cost per ounce and per pound are measures that are not in accordance with IFRS. The Company has included these metrics to supplement its consolidated financial statements, which are presented in accordance with IFRS. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance, operating results or financial condition prepared in accordance with IFRS. The Company has included cash production cost per ounce and per pound data because it understands that certain investors use this information to determine the Company’s ability to generate earnings and cash flow. The measures are not necessarily indicative of operating results, cash flow from operations, or financial condition as determined under IFRS. The following tables provide a reconciliation of cost of sales to the cash costs of production in total dollars and in dollars per gold ounce for the CSH Mine or per copper pound for the Jiama Mine:
- 13 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Cash production cost for gold is calculated as total cost of sales adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of gold per ounce is calculated as total cash production cost divided by total gold sold (ounces). CSH Mine (Gold) Three months ended December 31, Year ended December 31, 2025 2024 2025 2024 US$ Per US$ Per US$ Per US$ ounce US$ ounce US$ ounce US$ Total Cost of sales 1 Adjustment – Depreciation & depletion
41,593,138 (5,304,923)
1,747 51,018,707 (223) (12,164,347)
Adjustment – Amortization of intangible assets
(56,998)
(2)
(163,015)
Total cash production costs
36,231,217
1,522
38,691,345
Total Gold sold ounces
23,814
1,721 164,875,882 (410) (39,205,424)
(5)
(642,989)
1,665 165,574,005 (396) (57,678,651)
(6)
US$ Per ounce 1,645 (573)
(787,919)
(8)
1,306 125,027,469
1,263 107,107,435
1,064
29,655
99,010
100,682
Cash production cost of gold US$ per ounce calculated as total cash production cost divided by total gold sold ounces. Cash Production cost for copper is calculated as production costs (total cost of sales adjusted by General and administrative expenses and Research and development expenses) adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of copper (pounds) is calculated as total cash production cost divided by total copper sold (pounds).
- 14 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Jiama Mine (Copper with by-products credits) Three months ended December 31, Year ended December 31, 2025 2024 2025 2024 US$ Per US$ Per US$ Per US$ Pound US$ Pound US$ Pound US$ Total Cost of sales
133,232,929
3.42 120,395,116
2.74 461,258,144
General and administrative expenses Research and development expenses
20,314,047 16,398,899
0.52 0.42
0.39 0.18
Total production cost
169,945,975
4.36 145,534,336
Adjustment – Depreciation & depletion Adjustment – Amortization of intangible assets
(21,924,108)
US$ Per Pound
2.95 404,152,493
3.87
0.36 0.21
43,581,877 15,722,098
0.42 0.15
3.31 549,928,732
3.52 463,456,468
4.44
(0.56) (21,527,256)
(0.49) (94,305,794)
(0.60) (66,877,508)
(0.64)
(6,454,180)
(0.17)
(7,399,660)
(0.17) (28,363,980)
(0.18) (19,117,739)
(0.18)
Total cash production costs
141,567,687
3.63 116,607,420
2.65 427,258,958
2.74 377,461,221
3.62
By-products credits
(135,694,593)
(3.49) (106,554,080)
(2.42) (469,218,504)
(3.00) (221,844,500)
(2.12)
0.14
0.23 (41,959,546)
(0.26) 155,616,721
1.50
Total cash production costs after by-products credits Total Copper sold pounds
5,873,094
17,020,625 8,118,595
10,053,340
38,917,010
43,940,061
55,871,979 32,798,609
156,437,873
104,545,457
Cash production cost of copper US$ per pound calculated as total cash production cost divided by total copper sold pounds.
MINERAL PROPERTIES The CSH Mine The CSH Mine is located in Inner Mongolia Autonomous Region of China (Inner Mongolia). The property hosts two lowgrade, near surface gold deposits, along with other mineralized prospects. The main deposit is called the Northeast Zone (the “Northeast Zone”), while the second, smaller deposit is called the Southwest Zone (the “Southwest Zone”). The CSH Mine is owned and operated by Inner Mongolia Pacific Mining Co. Limited, a Chinese Joint Venture in which the Company holds a 96.5% interest and Ningxia Nuclear Industry Geological Exploration Institution holds the remaining 3.5%. The CSH Mine is an open-pit mining operations with a designed mining and processing capacity of 60,000 tpd. In July 2019, CSH updated its mine plan based on a result of latest ultimate limit optimization, in which the production rate was reduced to 40,000 tpd with a life of mine (“LoM”) of seven years as of 2019. The run-of-mine ore is heap leached with cyanide solution to extract gold and electro-winned to produce a gold dore which is sold to refiners. In June 2020, the operation of southwest pit ended.
- 15 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
The open-pit operations at the CSH gold mine are nearing the end of its mine life. With the increase in the pit’s depth, the height and exposed area of the pit wall have increased, and the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. Ensuring slope stability and avoiding systematic risks at this stage is the Company’s top priority to ensure safe and sustainable production. The Company continues to evaluate the potential for underground operations. The major new contracts entered into during the year ended December 31, 2025:
Item No. Contract Name 1
Sales Contract for Waste Materials
2
Open-pit to Underground Engineering Design Sales Contract for Waste Materials
3
4 5
2025 Open-pit Mine Slope Remediation Project Contract Sales Contract for Waste Materials
Subject amount (US$ millions)
Counterpart Hunan Zhongxing Environmental Protection Technology Co., Ltd China ENFI Engineering Technology Co., Ltd Hunan Zhongxing Environmental Protection Technology Co., Ltd China National Gold Group Third Engineering Co., Ltd. Hunan Zhongxing Environmental Protection Technology Co., Ltd
Contract period (effective day and expiration date)
Date of Contract
10.81
2025.3.24 – 2025.4.24
2025.3.24
5.06
2025.4.24 – 2033.4.24 2025.6.10 – 2025.7.2
2025.4.24
2025.8.27 – 2026.10.31 2025.12.25 – 2026.2.24
2025.8.27
11.27
9.37 19.78
2025.6.10
2025.12.25
Production Update CSH Mine
Ore mined and placed on pad (tonnes) Average ore grade (g/t) Recoverable gold (ounces) Ending gold in process and gold dore bars (ounces) Waste rock mined (tonnes)
Three months ended December 31, 2025 2024
Year ended December 31, 2025 2024
1,834,826 0.44 17,014
1,576,243 0.41 13,187
10,299,404 0.49 95,735
9,208,842 0.58 102,866
142,894 1,493,922
146,169 2,800,938
142,894 7,011,840
146,169 10,548,732
For the three months ended December 31, 2025, the total amount of ore placed on the leach pad was 1.8 million tonnes, with total contained gold of 17,014 ounces (529 kilograms). The overall accumulative project-to-date gold recovery rate remained consistent at approximately 56.63% at the end of December 31, 2025 from 56.47% at the end of September 30, 2025. Of which, gold recovery from the phase I and phase II heap leach pads were 59.77% and 54.67% at December 31, 2025, respectively.
- 16 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Exploration The CSH Gold Mine drilled 264 meters from hole DDH9200-3, which was remaining from the 2024 drilling program. There was no other drilling program in 2025 for the CSH Mine.
Mineral Resource Update CSH Mine Mineral Resources by category, at December 31, 2025 under NI 43-101 are listed below:
Location
Mineral Resource Category
Tonnage (x1000 t)
Au (g/t)
Metal Au (t)
Au (Moz)
Remaining within the open pit limit at a cut-off grade of 0.28 g/t Au
Measured Indicated M+I Inferred
6,031 6,647 12,678 2,576
0.68 0.72 0.70 0.41
4.09 4.75 8.84 0.15
0.132 0.153 0.285 0.005
Underground at a cut-off grade of 0.30 g/t Au
Measured Indicated M+I Inferred
88,200 89,850 178,050 62,090
0.67 0.58 0.62 0.49
58.66 52.07 110.72 30.68
1.89 1.67 3.56 0.99
Note: Mineral Resources are reported in relation to a conceptual open-pit mining and underground block caving mining. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate. Raw assays have been capped. Mineral Resources include Mineral Reserves. Mineral Resources are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. Additional Mineral Resources are reported at a cut-off grade of 0.30 g/t Au for underground block caving mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce is equal to 31.1035 grams. The mineral resource estimates include Au only. CGME Consulting limited (CGME) has estimated the mineral resources of the CSH gold deposit based on a cut-off grade of 0.28 g/t Au within the optimized ultimate open-pit limit and a cut-off grade of 0.30 g/t Au below the open pit limit on April 1, 2022. The resource estimate was conducted using Ordinary Kriging, validated by Inversed Distance Squared method, and Micromine modelling software.
- 17 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
CGME considers that blocks estimated for the first estimation pass with an average anisotropic distance to samples of less than 45 m can be classified as Measured Mineral Resources, and blocks estimated for the second estimation pass with an average anisotropic distance to samples of less than 80 m can be classified as Indicated Mineral Resources, and blocks estimated for the third estimation pass with an average anisotropic distance to samples of not more than 150 m can be categorised as Inferred Mineral Resources. For those Measured and Indicated Mineral Resource blocks, CGME considers that the degree of confidence is sufficient to allow an appropriate application of technical and economic parameters to support mine planning and to allow evaluation of the economic viability of the deposit, which is also adequate to support the open pit mining operations. In CGME’s opinion, the upper portions of gold mineralization at the CSH Gold Project are amenable to extraction by open pit mining with a cut-off grade optimised of 0.28 g/t Au, and the block caving mining operation would be the choice for extraction below the optimized open pit limits with a cut-off grade of 0.30 g/t Au in this estimation based on a Reasonable Prospect for Eventual Economic Extraction (“RPEEE”). It is noted that the partial mineral resources outside of the open pit limit but above the bottom plane may not be amenable to extraction in the future. Meanwhile, the mineral resources located below 840 m ASL at NE zone and 1,250 m ASL at SW zone may not be amendable to extraction in the future due to either excessive depth or high dilution. These mineral resources that may not be amendable to extraction in the future are excluded from the Mineral Resource Statement in this Report. Block model quantity and grade estimates for the CSH gold deposit were classified according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Yuan Chen, MSc., MAIG (M4014)/RPGeo (10262) (April 2022), an independent Qualified Person for the purposes of National Instrument 43-101 and updated by Mr. Yingting Guo, MMSA., PGeo., an independent Qualified Person for the purposes of National Instrument 43-101 on December 31, 2025.
Mineral Reserves Update CSH Mine Mineral Reserves by category at December 31, 2025 under NI 43-101 are summarized below:
Type
Metal Au t
T (x 1,000)
Diluted Au g/t
Au Moz
Proven Probable
6,405 7,222
0.64 0.67
4.11 4.87
0.13 0.16
Total
13,627
0.66
8.98
0.29
Note: Mineral Reserves are reported based on the optimized ultimate open pit limit. All figures are rounded to reflect the relative accuracy of the estimate. Mineral Reserves are included in Mineral Resources. Mineral Reserves are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching & metallurgical recovery of 60% and gold bullion market price of USD1,568 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce is equal to 31.1035 grams. The Proven Mineral Reserves are 6.41 Mt at a grade of 0.64 g/t Au for the gold content of 4.11 t or 0.13 Moz, and the Probable Mineral Reserves are 7.22 Mt at a grade of 0.67 g/t Au for the gold content of 4.87t or 0.16 Moz, totaling Mineral Reserves of 13.63 Mt at a grade of 0.66 g/t Au for the gold content of 8.98 t or 0.29 Moz. The Mineral Reserves for the CSH gold deposit were estimated according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Guangpian Zhang, AusIMM, a full time Principal Mining Engineer for CGME and a Qualified Person for the purposes of National Instrument 43-101.
- 18 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
The Jiama Mine Jiama is a large copper-gold polymetallic deposit containing copper, gold, silver, molybdenum, lead and zinc, located in the Gandise metallogenic belt in Tibet Autonomous Region of China. The Jiama Mine has both underground mining and open-pit mining operations. Phase I of the Jiama Mine commenced operation in the latter half of 2010 and reached its design capacity of 6,000 tpd in early 2011. Phase II of the Jiama Mine commenced mining operations in 2018 with 44,000 tpd design capacity. The combined mining and processing design capacity at the Jiama Mine is 50,000 tpd. The major new contracts entered into during the year ended December 31, 2025:
Item No. Contract Name 1
2 3
4 5
6
7
8 9 10 11 12
Subject Contract period amount (effective day and (US$ millions) expiration date)
Counterpart
Tibet Huatailong Mining Development Co., Ltd. Jiama China National Gold Group Construction Co., Ltd. 244.25 Copper Polymetallic Mine Youlongbu Tailings Dam PC General Contracting Contract Molybdenum Concentrate Purchase and Sales Contract China National Gold Group (Shanghai) Trading Co., 50.13 Ltd. Supplementary Agreement to the “Tibet Huatailong China National Gold Group International Trading Co., 69.63 Mining Development Co., Ltd. 2022-2024 Copper Ltd. Concentrate Powder Purchase and Sales Contract Tibet Huatailong Mining Development Co., Ltd. 2025 Sichuan Haotianyu Construction Machinery Leasing 2.91 Machinery and Equipment Leasing Project Contract Co., Ltd. Tibet Huatailong Mining Development Co., Ltd. Jiama Xinjiang Nonferrous Metallurgy Design and Research 3.06 Copper Polymetallic Mine Youlongbu Tailings Dam Institute Co., Ltd. General Contracting and Supervision Project Service Contract Tibet Huatailong Mining Development Co., Ltd. Tibet Gaozheng Blasting Engineering Co., Ltd. 9.02 Blasting Engineering Construction Service Project Construction Contract Tibet Huatailong Mining Development Co., Ltd.23-26 BGRIMM Technology Group Co., Ltd. (Consortium 14.03 Sub-dam Embankment and Drainage Works of Leader), Jiangxi Copper Industry Group Construction Guolanggou Tailings Pond EPC General Contracting Co., Ltd. (Consortium Member) Project Copper Concentrates Purchase and Sales Contract China National Gold Group (Shanghai) Trading Co., 2,031.28 Ltd. Contract for Blasting Engineering Construction Services Tibet Zhongjin Xinlian Blasting Engineering Co., Ltd. 6.16 of Tibet Huatailong Mining Development Co., Ltd. Sodium Hydrosulfide Zibo Tengxiang Economic and Trade Co., Ltd. 5.12 Cement China Jinyu Gold Materials Co., Ltd. 8.03 Sodium Hydrosulfide Fengshi Chemical (Shanghai) Co., Ltd. 7.69
- 19 -
Date of Contract
2025.03 – 2027.06 2025.03
2025.05 – 2028.05 2025.05 2025.05 – 2025.06 2025.05
2025.04 – 2025.12 2025.04 2025.06 – 2027.11 2025.06
2025.06 – 2026.05 2025.06
2025.5.6- 2026.6.29 2025.5.6
2025.5.27-2028.5.27 2025.5.27 2025.6.1-2026.5.31 2025.05.30 2025.6.26-2026.6.25 2025.6.26 2025.6.30-2026.6.29 2025.6.30 2025.6.30-2026.6.29 2025.6.30
MANAGEMENT’S DISCUSSION AND ANALYSIS
Item No. Contract Name 13
Subject Contract period amount (effective day and (US$ millions) expiration date)
Counterpart
14
Copper-Lead-Zinc Mixed Concentrates Purchase and Sales Contract Cement
China National Gold Group (Shanghai) Trading Co., Ltd. Tibet Jiaofa Transportation Industry Co., Ltd.
15
Steel Balls
Baiyin Hengcheng Machinery Manufacturing Co., Ltd. 3.04
16
Steel Balls
Inner Mongolia Jinyu Fengxing Mining Wear-resistant Materials Co., Ltd.
Date of Contract
791.21
2025.7.18-2027.7.17 2025.7.18
8.01
2025.11.212026.11.20 2025.11.302026.11.29 2025.12.292026.12.28
3.30
2025.11.21 2025.11.30 2025.12.29
Production Update Jiama Mine
Ore processed (tonnes) Average copper ore grade (%) Copper recovery rate (%) Average gold grade (g/t) Gold recovery rate (%) Average silver grade (g/t) Silver recovery rate (%) Average Lead grade (%) Lead recovery rate (%) Average Zinc grade (%) Zinc recovery rate (%) Average Moly grade (%) Moly recovery rate (%)
Three months ended December 31, 2025 2024 2,871,882 0.69 85 0.28 73 20.14 69 0.77 77 0.53 73 0.028 32
- 20 -
3,095,471 0.78 82 0.32 74 21.91 68 1.16 78 0.61 72 0.03 24.97
Year ended December 31, 2025 2024 11,838,916 0.71 84 0.29 73 21.15 70 0.96 78 0.58 73 0.037 33
8,197,448 0.71 82 0.29 70 19.72 62 1.24 75 0.68 72 0.029 23.20
MANAGEMENT’S DISCUSSION AND ANALYSIS
Exploration In 2025, Jiama has carried out exploration work in the mine deep and peripheral areas of the Jiama mining area, completing a total of 1,254 cubic meters of pit exploration, 4,870 meters of underground drilling, and 25,450 meters of surface drilling. The main results have been achieved as below: 1. further controlling the main skarn orebody of the interlayered structure in the Jiama mining area, defining the skarn orebodies in the surrounding contact zone; 2. two gold mineralization zones, one zinc mineralization zone, and one molybdenum mineralization zone have been defined at Bayi Ranch prospecting area. Since the consolidation of mineral rights in Jiama area, the Jiama Mine has completed a total of 297,720 meters of drilling with 622 holes.
Mineral Resources Estimate The Mineral Resource estimate was originally independently completed by Runge Pincock Minarco (RPM) Global dated 12th November 2012. Mining One was provided with the block model and all files related to construction of the model. The information contained within this report is based on information provided to Mining One, which has been verified and, in some instances, refined by Mining One. The Resource estimate is based on three dimensional geological and mineralisation models that were informed by the drill hole data set. The Resource is based on three main geological domains that represent Skarn, Hornfels and Porphyry lithologies; mineralisation is hosted within each of these domains. Domain boundaries were constructed using a combination of the geology domains and a 0.1% Cu equivalent cut–off for the mineralisation. Standard wireframing procedures were used in relation to extrapolation of polygons half the drill spacing distance past known data points and tapering of zone thickness on the periphery of the domains. Mining One Pty Ltd. noted that gold and silver mineralization within the ore body had a significantly higher spatial variability than the other elements. This classification takes into account the proposed large scale mining techniques where Au and Ag will only be credits to the overall products from the operations. Mining One Pty Ltd has assumed that Au and Ag will not be assigned a single cut-off grade for a selected mining block and will be mined in conjunction with the other elements.
- 21 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Jiama Mine resources by category as of December 31, 2025 under NI 43-101:
Class
Quantity Mt
Cu %
Mo %
Measured Indicated M+I Inferred
90.57 1294.56 1385.13 405.18
0.38 0.40 0.40 0.31
0.04 0.03 0.03 0.03
Jiama Project – Cu, Mo, Pb, Zn, Au, and Ag Mineral Resources under NI 43-101 Reported at a 0.3% Cu Equivalent Cut off grade*, as of December 31, 2025 Cu Metal Mo Metal Pb Metal Pb % Zn % Au g/t Ag g/t (kt) (kt) (kt) 0.04 0.05 0.05 0.08
0.02 0.03 0.03 0.04
0.07 0.10 0.10 0.10
5.04 5.48 5.45 5.13
344.76 5126.91 5471.67 1256.07
33.22 445.26 478.48 121.56
33.10 605.10 638.20 324.15
Zn Metal (kt)
Au Moz
Ag Moz
16.60 375.05 391.65 174.61
0.21 4.12 4.33 1.31
14.67 227.97 242.64 66.83
Note: Figures reported are rounded which may result in small tabulation errors. The prices of Cu, Mo, Pb, Zn, Au and Ag are US$2.9/lbs; US$15.5/lbs; US$2.9/lbs; US$0.95/lbs; US$1,300/oz and $20/oz respectively. The Copper Equivalent basis for the reporting of resources has been compiled on the following basis: CuEq Grade: = (Ag Grade * Ag Price + Au Grade * Au Price + Cu Grade * Cu Price + Pb Grade * Pb Price + Zn Grade * Zn Price + Mo Grade * Mo Price)/Copper Price The Mineral Resources include the Mineral Reserves Resource Estimate by Runge Pincock Minarco on 12th November of 2012 and updated by Mining One Pty Ltd. In 2014 and by Tony Guo, P.Geo, a Qualified Person as defined by NI 43-101 in 2025.
- 22 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
Mineral Reserves Estimate The selected mining strategies developed by CGDI in conjunction with China Gold consider conventional truck shovel mining for the Jiaoyan and South open pits. Various mining methods have been proposed for the Phase II Expansion Underground Mine with the primary method being Sub Level Stoping with fill (Primary/Secondary/(Tertiary)). The reserve estimate for the Jiama Project underground mine is based on a combination of Sub Level Open Stoping with Paste fill, Room and Pillar and Cut and Fill. The mineral reserve estimate is summarised below which are inclusive of the modifying factors for mining recovery and dilution. Jiama Mine reserves by category as of December 31, 2025 under NI 43-101:
Class
Quantity Mt
Cu %
Jiama Project Statement of NI 43-101 Mineral Reserve Estimate as of December 31, 2025 Cu Metal Mo Metal Pb Metal Zn Metal Mo % Pb % Zn % Au g/t Ag g/t (kt) (kt) (kt) (kt)
Proven Probable P+P
16.60 320.23 336.83
0.60 0.60 0.60
0.05 0.03 0.04
0.02 0.13 0.12
0.02 0.07 0.07
0.19 0.16 0.16
7.66 10.38 10.25
99.61 1921.37 2020.98
8.30 96.07 104.37
3.32 416.30 419.62
3.32 224.16 227.48
Au Moz
Ag Moz
0.10 1.65 1.75
4.09 106.88 111.97
Notes: 1.
All Mineral Reserves have been estimated in accordance with the JORC code and have been reconciled to CIM standards as prescribed by the NI 43-101.
Mineral Reserves were estimated using the following mining and economic factors: Open Pits: a)
5% dilution factor and 95% recovery were applied to the mining method;
b)
an overall slope angles of 43 degrees;
c)
a copper price of US$2.9/lbs;
d)
an overall processing recovery of 88 – 90% for copper.
Underground:
a)
10% dilution added to all Sub-Level Open Stoping;
b)
Stope recovery is 87% for Sub-Level Open Stoping;
c)
An overall processing recovery of 88 – 90% for copper.
The cut-off grade for Mineral Reserves has been estimated at copper equivalent grades of 0.3% Cu (NSR) for the open pits and 0.45% Cu (NSR) for the underground mine.
Mineral Reserves have been estimated by Runge Pincock Minarco on 12th November of 2012 and updated by Mining One Pty Ltd. in 2014 and by Tony Guo, MMSA(QP), a Qualified Person as defined by NI 43-101 in 2025.
- 23 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
LIQUIDITY AND CAPITAL RESOURCES The Company operates in a capital intensive industry. The Company’s liquidity requirements arise principally from the need for financing its mining and mineral processing operations, exploration activities and acquisition of exploration and mining rights. The Company’s principal sources of funds have been proceeds from borrowings from commercial banks, corporate bonds financing, equity financings, and cash generated from operations. The Company’s liquidity primarily depends on its ability to generate cash flow from its operations and to obtain external financing to meet its debt obligations as they become due, as well as the Company’s future operating and capital expenditure requirements. At December 31, 2025, the Company had an accumulated surplus of US$813.1 million, working capital of US$580.0 million and borrowings of US$533.4 million. The Company’s cash balance at December 31, 2025 was US$739.4 million, among which cash and cash equivalents was US$399.4 million, Restricted cash was US$34.2 million, term deposits was US$305.9 million. Management believes that its forecast operating cash flows are sufficient to cover the next twelve months of the Company’s operations including its planned capital expenditures and current debt repayments. The Company’s borrowings are comprised of US$217.0 million of short term debt facilities with interest rates ranging from 1.25% to 4.36% per annum arranged through various banks. In addition, on November 3, 2015, the Company entered into a Loan Facility agreement with a syndicate of banks, led by Bank of China. The lenders agreed to lend an aggregate principal amount of RMB3.98 billion, approximately US$613 million with the initial interest rate of 2.83% per annum. The proceeds from the Loan Facility are to be used for the development of the Jiama Mine. The loan is secured by the mining rights for the Jiama Mine. As of December 31, 2025 the Company has fully drawn under this Facility. The outstanding loan balance is RMB1.39 billion (approximately US$197 million), bearing an annual interest rate of 1.5% maturing on November 5, 2028. On April 29, 2020, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB1.4 billion (approximately US$197.8 million).As of December 31, 2025, the Company has fully drawn down under this facility. The outstanding loan balance is RMB824 million (approximately US$117 million), bearing an annual interest rate of 1.95%, with maturity on April 28, 2033. On August 8, 2025, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB2.1 billion (approximately US$294 million).As of December 31, 2025, the Company has drawn down RMB50 million (approximately US$7.11 million) under this facility, bearing an annual interest rate of 1.5%, with maturity on June 21, 2030. On May 31, 2023, the Company obtained a bilateral loan with an aggregate principal amount of RMB400 million (approximately US$56.5 million) from China Gold Finance Co., Ltd. at an annual interest rate of 2.05%. As of December 31, 2025, the outstanding loan balance was RMB400 million (approximately US$56.91 million).
- 24 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
On November 9, 2023, the Company obtained a bilateral loan with an aggregate principal amount of RMB100 million (approximately US$14.1 million) from China Construction Bank at an annual interest rate of 1.85%. As of December 31, 2025, the outstanding loan balance was RMB90 million (approximately US$12.8 million). On May 13, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million (approximately US$28.2 million) from Lhasa Chengguan District Sub branch of Agricultural Bank of China Co., Ltd. at an annual interest rate of 1.85% for a term of 3 years. As of December 31, 2025, the outstanding loan balance was RMB65 million (approximately US$9.2 million). On August 20, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million (approximately US$28.04 million) from China Gold Finance Co., Ltd. at an annual interest rate of 2.45% for a term of 3 years. As of December 31, 2025, the outstanding loan balance was RMB180 million (approximately US$25.61 million). On May 12, 2025, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$64 million from China Construction Bank (Asia) Corporation Limited, bearing interest at a floating rate based on Term SOFR. On June 10, 2025, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$15 million from China Everbright Bank Co., Ltd., Hong Kong Branch, bearing interest at a floating rate based on Term SOFR. The Company believes that the availability of debt financing in China at favorable rates will continue for the foreseeable future. The Company continues to review and assess its assets for impairment as part of its financial reporting processes. To date, the assessment carried out by the Company support the carrying values of the Company’s assets and no impairment has been required. However, the management of the Company continues to evaluate key assumptions on estimates and management judgements in order to determine the recoverable amount of the CSH Mine and the Jiama Mine.
- 25 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
CASH FLOWS The following table sets out selected cash flow data from the Company’s consolidated cash flow statements for the year ended December 31, 2025 and December 31, 2024. Year ended December 31, 2025 2024 US$’000 US$’000 Net cash from operating activities Net cash used in investing activities Net cash used in financing activities Net increase (decrease) in cash and cash equivalents Effect of foreign exchange rate changes on cash and cash equivalents Cash and cash equivalents, beginning of period
709,984 (246,828) (253,685) 209,471 6,152 183,779
306,896 (204,875) (16,171) 85,850 692 97,237
Cash and cash equivalents, end of period
399,402
183,779
Operating cash flow For the year ended December 31, 2025, net cash inflow from operating activities was US$710.0 million which is primarily attributable (i) profit before income tax of US$560.2 million (ii) depreciation of property, plant and equipment of US$132.0 million and (iii) decrease in restricted bank balances of US$32.5 million, partially offset by (i) income tax paid of US$47.6 million (ii) interest paid of US$15.8 million and (iii) Interest income of US$8.7 million.
Investing cash flow For the year ended December 31, 2025, the net cash outflow from investing activities was US$246.8 million which is primarily attributable to (i) placement of term deposits of US$306.6 million (ii) payment for acquisition of property, plant and equipment of US$50.1 million and (iii) payment for land use right of US$19.8 million, offset by (i) release of term deposits of US$119.0 million and (ii) interest income received of US$8.7 million.
Financing cash flow For the year ended December 31, 2025, the net cash outflow mainly from financing activities was US$253.7 million which is primarily attributable to (i) repayment of borrowings of US$306.2 million (ii) dividends paid to shareholders of the Company of US$31.7 million and (iii) dividends paid to non-controlling shareholders of US$1.2 million offset by proceeds of bank and other borrowings of US$86.0 million.
Expenditures Incurred For the year ended December 31, 2025, the Company incurred mining costs of US$61.1 million, mineral processing costs of US$104.7 million and transportation costs of US$3.4 million.
Gearing ratio Gearing ratio is defined as the ratio of consolidated total debt to consolidated total equity. As at December 31, 2025, the Company’s total debt was US$533.4 million and the total equity was US$2,337.0 million. The Company’s gearing ratio was therefore 0.23 as at December 31, 2025 compared to 0.26 as at September 30, 2025.
- 26 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
SIGNIFICANT INVESTMENTS, ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES. ASSOCIATES AND JOINT VENTURES, AND FUTURE PLAN FOR MATERIAL INVESTMENTS OF CAPITAL ASSETS Other than as disclosed elsewhere in this MD&A or in the consolidated financial statements for the year ended December 31, 2025, there were no significant investments held by the Company, nor were there any material acquisitions or disposals of subsidiaries, associates and joint ventures during the year ended December 31, 2025. Other than as disclosed in this MD&A, there was no plan authorized by the Board for other material investments or additions of capital assets at the date of this MD&A.
CHARGE ON ASSETS Other than as disclosed elsewhere in this MD&A and condensed consolidated financial statements, none of the Company’s assets were pledged as at December 31, 2025.
EXPOSURE TO FLUCTUATIONS IN EXCHANGE RATES AND RELATED HEDGES The Company is exposed to the financial risk related to the fluctuation of foreign exchange rates for the monetary assets and liabilities denominated in the currencies other than the functional currencies to which they relate. The Company has not hedged its exposure to currency fluctuation. However, the Management monitors foreign exchange exposure and will consider hedging significant foreign currency exposure should the need arise. Refer to Note 33, Financial Instruments, in the annual consolidated financial statements for the year ended December 31, 2025.
COMMITMENTS Commitments include principal payments on the Company’s bank loans and syndicated loan facility, corporate bonds, and capital commitments in respect of the future acquisition of property, plant and equipment and construction for both the CSH Mine and the Jiama Mine. The Company’s capital commitments relate primarily to the payments for purchase of equipment and machinery for both mines and payments to third-party contractors for the provision of mining and exploration engineering work and mine construction work for both mines. The Company has entered into contracts that prescribe such capital commitments; however, liabilities relating to them have not yet been incurred. Refer to Note 34, Commitments, in the annual consolidated financial statements for the year ended December 31, 2025. The following table outlines payments for commitments for the periods indicated:
Principal repayment of bank loans Entrusted loan payable
Total US$’000
Within One year US$’000
Within Two to five years US$’000
Over five years US$’000
504,985 28,454
217,004 28,454
219,171 –
68,810 –
- 27 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
In addition to the table set forth above, the Company has entered into service agreements with third-party contractors for the provision of mining and exploration engineering work and mine construction work for the CSH Mine. The fees for such work performed and to be performed each year varies depending on the amount of work performed. The Company has similar agreements with third party contractors for the Jiama Mine.
RELATED PARTY TRANSACTIONS China National Gold Group Co., Ltd. (formerly known as China National Gold Group Corporation) (“CNG”) owned 40.01 percent of the outstanding common shares of the Company as at December 31, 2024 and December 31, 2025. The Company had major related party transactions with the following companies related by way of shareholders or shareholder in common: The Company’s subsidiary, Inner Mongolia Pacific is a party to a non-exclusive contract for the purchase and sale of doré with CNG (the “Dore Sales Contract”) pursuant to which Inner Mongolia Pacific sells gold doré bars to CNG. The pricing is based on the monthly average price of gold ingot as quoted on the Shanghai Gold Exchange and the daily average price of silver as quoted on the Shanghai Huatong Platinum & Silver Exchange prevailing at the time of each relevant purchase order during the contract period. The Dore Sales Contract has been in effect since October 24, 2008 and was renewed for a new term that commenced on January 1, 2018 and expired on December 31, 2020, which renewal was approved by the Company’s shareholders on June 28, 2017. On June 16, 2020, the third Supplemental Contract for Purchase and Sale of Dore was approved by the Company’s Shareholders, commencing on January 1, 2021 and expiring on December 31, 2023. On June 29, 2023, the fourth supplemental Contract for Purchase and Sale of Dore was approved by the Company’s Shareholders, commencing on January 1, 2024 and expiring on December 31, 2026. Revenue from sales of gold doré bars to CNG was US$338.5 million for the year ended December 31, 2025 which increased from US$246.9 million for the year ended December 31, 2024. The Company is also a party to a Product and Service Framework Agreement with CNG, pursuant to which CNG provides construction, procurement and equipment financing services to the Company and also purchases the copper concentrates produced at the Jiama Mine. The quantity of copper concentrates, pricing terms and payment terms may be established from time to time by the parties with reference to the pricing principles for connected transactions set out under the Product and Service Framework Agreement. On June 28, 2017, the Supplemental Product and Service Framework Agreement was approved and extended to expire on December 31, 2020. On June 16, 2020, the third Supplemental Product and Service Framework Agreement was approved by the Company’s Shareholders, commencing on January 1, 2021 and expiring on December 31, 2023. On June 29, 2023, the fourth Supplemental Product and Service Framework Agreement was approved by the Company’s Shareholders, commencing on January 1, 2024 and expiring on December 31, 2026. For the year ended December 31, 2025, revenue from sales of copper concentrate and other products to CNG was US$964.8 million compared to US$505.1 million for the same period in 2024. For the year ended December 31, 2025, construction services of US$139.1 million were provided to the Company by subsidiaries of CNG compared to US$91.3 million for the same period in 2024.
- 28 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
In addition to the aforementioned major related party transactions, the Company also obtains additional services from related parties in its normal course of business, including a Loan Agreement and a Deposit Services Agreement entered into on March 25, 2019, December 31, 2019, December 22, 2020 and a Financial Service Agreement on May 5, 2021 among the Company and China Gold Finance. The Company and China Gold Finance entered into a 2024 Financial Service Agreement on June 6, 2024. As part of the 2024 Financial Service Agreement, China Gold Finance agreed to provide the Company with a range of financial services including (a) Deposit Services, (b) Lending Services, (c) Settlement Services and (d) Other Financial Services. On June 27, 2024, the 2024 Financial Services Agreement was approved by the Company’s Shareholders, commencing on the date of the approval by the Independent Shareholders and up to and including December 31, 2026. Refer to Note 30 of the consolidated financial statements for details of significant related party transactions during the year ended December 31, 2025.
PROPOSED TRANSACTIONS The Board of Directors has given the Company approval to conduct reviews of a number of projects that may qualify as acquisition targets through joint venture, merger and/or outright acquisitions. The Company did not have any material acquisition and disposal of subsidiaries and associated companies for the year ended December 31, 2025. The Company continues to review possible acquisition targets.
CRITICAL ACCOUNTING ESTIMATES In the process of applying the Company’s accounting policies, the Directors of the Company have identified accounting judgments and key sources of estimation uncertainty that have a significant effect on the amounts recognized in the audited annual consolidated financial statements. Key assumptions concerning the future and other key sources of estimation uncertainty at the end of each reporting period that have a risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next twelve months are described in Note 4 of the audited annual consolidated financial statements for the year ended December 31, 2025.
CHANGE IN ACCOUNTING POLICIES A summary of new and revised IFRS standards and interpretations are outlined in Note 2 of the audited annual consolidated financial statements as at December 31, 2025.
FINANCIAL INSTRUMENTS AND OTHER INSTRUMENTS The Company holds a number of financial instruments, the most significant of which are equity securities, accounts receivables, accounts payables, cash and loans. The financial instruments are recorded at either fair values or amortized amount on the balance sheet. The Company did not have any financial derivatives or outstanding hedging contracts as at December 31, 2025.
- 29 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
OFF-BALANCE SHEET ARRANGEMENTS As at December 31, 2025, the Company had not entered into any off-balance sheet arrangements.
DIVIDEND AND DIVIDEND POLICY The Company’s dividend policy is a key component of its long-term growth strategy. It aims to optimize capital allocation to drive business expansion while maintaining stable returns for shareholders. After successfully distributing special dividends for three consecutive years (2021-2023), the Company is introducing an enhanced dividend policy comprised of a base dividend supplemented by a variable component that adjusts based on financial performance and market conditions. Basic dividend: Subject to profitability in the previous financial year and after assessing the Company’s cash flow position and future capital requirements, the Company aims to distribute a basic dividend at a payout ratio of 30% of the net profit from the preceding financial year, with cash dividends paid annually. Variable Component: Subject to favorable market conditions and sufficient funds, the Company may distribute special dividends in addition to the basic dividend. Dividends may vary in amount and consistency or be discontinued at the Board of Directors’ discretion depending on variables including but not limited to operational cash flows, Company development requirements and strategies, spot metal prices, taxation, general market conditions and other factors. Subsequent to the end of the reporting period, a dividend in respect of the year ended December 31, 2025 of US$0.47 per common share, (the basic dividend of US$140,088,841, and the special dividend of US$46,696,280) in an aggregate amount of US$186,785,121, has been declared by the directors of the Company upon the approval of the board resolution dated March 30, 2026.
OUTSTANDING SHARES As of December 31, 2025 the Company had 396,413,753 common shares issued and outstanding.
DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING Management is responsible for the design of disclosure controls and procedures (“DC&P”) and the design of internal control over financial reporting (“ICFR”) to provide reasonable assurance that material information relating to the Company, including its consolidated subsidiaries, is made known to the Company’s certifying officers. The Company’s Chief Executive Officer and Chief Financial Officer have each evaluated the Company’s DC&P and ICFR as of December 31, 2025 and, in accordance with the requirements established under Canadian National Instrument 52-109 – Certification of Disclosure in Issuer’s Annual and Interim Filings, the Chief Executive Officer and Chief Financial Officer have concluded that these controls and procedures were effective as of December 31, 2025, and provide reasonable assurance that material information relating to the Company is made known to them by others within the Company and that the information required to be disclosed in reports that are filed or submitted under Canadian securities legislation are recorded, processed, summarized and reported within the time period specified in those rules.
- 30 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
The Company’s Chief Executive Officer and Chief Financial Officer have used the Committee of Sponsoring Organizations of the Treadway Commission (COSO) 2013 framework to evaluate the Company’s ICFR as of December 31, 2025 and have concluded that these controls and procedures were effective as of December 31, 2025 and provide reasonable assurance that financial information is recorded, processed, summarized and reported in a timely manner. Management is required to apply its judgment in evaluating the cost-benefit relationship of possible controls and procedures. The result of the inherent limitations in all control systems means design of controls cannot provide absolute assurance that all control issues and instances of fraud will be detected. During the year ended December 31, 2025, there were no changes in the Company’s DC&P or ICFR that materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.
RISK FACTORS There are certain risks involved in the Company’s operations, some of which are beyond the Company’s control. Aside from risks relating to business and industry, the Company’s principal operations are located within the People’s Republic of China and are governed by a legal and regulatory environment that in some respects differs from that which prevails in other countries. Readers of this MD&A should give careful consideration to the information included in this document and the Company’s audited annual consolidated financial statements and related notes. Significant risk factors for the Company are metal prices, government regulations, foreign operations, environmental compliance, the ability to obtain additional financing, risk relating to recent acquisitions, dependence on management, title to the Company’s mineral properties, natural disasters, pandemics such as COVID-19 and litigation. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks. For details of risk factors, please refer to the Company’s annual audited consolidated financial statements, and Annual Information Form filed from time to time on SEDAR+ at www.sedarplus.ca and www.hkex.com.hk.
QUALIFIED PERSON Disclosure of scientific or technical information in this MD&A was reviewed and approved by Mr. Tony Guo, MMSA(QP), the Company’s Qualified Person (“QP”) as defined by National Instrument 43-101. March 30, 2026
- 31 -
INDEPENDENT AUDITOR’S REPORT
TO THE SHAREHOLDERS OF CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD.
(incorporated in British Columbia, Canada with limited liability)
OPINION We have audited the consolidated financial statements of China Gold International Resources Corp. Ltd. (the “Company”) and its subsidiaries (collectively referred to as the “Group”) set out on pages 37 to 118, which comprise the consolidated statement of financial position as at December 31, 2025, and the consolidated statement of profit or loss and other comprehensive income, consolidated statement of changes in equity and consolidated statement of cash flows for the year then ended, and notes to the consolidated financial statements, including material accounting policy information. In our opinion, the consolidated financial statements give a true and fair view of the consolidated financial position of the Group as at December 31, 2025, and of its consolidated financial performance and its consolidated cash flows for the year then ended in accordance with IFRS Accounting Standards as issued by the International Accounting Standards Board (“IASB”) and have been properly prepared in compliance with the disclosure requirements of the Hong Kong Companies Ordinance.
BASIS FOR OPINION We conducted our audit in accordance with International Standards on Auditing (“ISAs”). Our responsibilities under those standards are further described in the Auditor’s Responsibilities for the Audit of the Consolidated Financial Statements section of our report. We are independent of the Group in accordance with the “Code of Ethics for Professional Accountants” issued by the Hong Kong Institute of Certified Public Accountants (“Code”), as applicable to audits of financial statements of public interest entities. We also have fulfilled our other ethical responsibilities in accordance with the Code. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion.
KEY AUDIT MATTER Key audit matter is the matter that, in our professional judgment, was of most significance in our audit of the consolidated financial statements of the current period. This matter was addressed in the context of our audit of the consolidated financial statements as a whole, and in forming our opinion thereon, and we do not provide a separate opinion on this matter.
- 32 -
INDEPENDENT AUDITOR’S REPORT
TO THE SHAREHOLDERS OF CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
KEY AUDIT MATTER (Cont’d) Key audit matter
How our audit addressed the key audit matter
Gold in Progress Refer to summary of accounting policies on “inventories” in note 3, accounting estimates and judgements in note 4(b) and disclosure of inventory in note 17 to the consolidated financial statements. For the year ended December 31, 2025, the carrying amount of inventory was approximately US$295 million. Inventory of the Group mainly includes gold in process inventory of approximately US$249 million, representing approximately 7.4% of the Group’s total assets. The Group measured its inventory at the lower of cost and estimated net realisable value. Gold in process inventory represents ore placed on leach pads and in process through heap leaching operations. Due to the nature of heap leaching, the quantity of recoverable gold cannot be directly measured and is instead estimated using models based on ore tonnage, assay grades and expected recovery rates. Assumptions and estimations are required in determining the quantity of gold in process inventories including the gold contained in the ore placed on leach pads and correspondingly gold that is expected to be recovered. The Group could be required to write down the recorded value of its gold in process inventories if estimations and assumptions are inaccurate. Because the nature of leaching process inherently limits the ability to precisely monitor inventory levels. The actual recovery of gold from the leach pad is not known until the leaching process has concluded at the end of the mine life. We have identified existence and valuation on gold in process inventory as a key audit matter because of its significance to the Group’s consolidated financial statements and involvement of significant management estimates in determining estimated outcomes of the models in assessing the existence and valuation of inventory as mentioned in the forgoing paragraphs.
- 33 -
Our procedures in relation to the existence of gold in process inventory included: •
Obtained an understanding of the Group’s process and controls over estimation of gold in process.
•
Tested the underlying production data used in estimation of gold in process used by management.
•
Obtained ore samples during a site visit and submitted these samples to an independent external laboratory testing to assess the reliability and consistency of assay grades used by management.
•
Engaged auditors’ expert to assist our assessment on the appropriateness of recovery rates adopted by management from heap leaching gold processing and the reasonableness on the model applied by management in estimating gold in process from heap leaching.
•
Tested the mathematical accuracy of the goldin-process estimation model and independently recalculated the estimated recoverable gold based on management’s key assumptions.
•
Performed sensitivity analysis on assessing the possible impact of reasonably changes in critical assumption such as recovery rates.
INDEPENDENT AUDITOR’S REPORT
TO THE SHAREHOLDERS OF CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
OTHER MATTERS The consolidated financial statements of the Group for the year ended December 31, 2024 were audited by another auditor who expressed an unmodified opinion on those statements on March 27, 2025.
OTHER INFORMATION The directors are responsible for the other information. The other information comprises the information included in the annual report, but does not include the consolidated financial statements and our auditor’s report thereon. Our opinion on the consolidated financial statements does not cover the other information and we do not express any form of assurance conclusion thereon. In connection with our audit of the consolidated financial statements, our responsibility is to read the other information and, in doing so, consider whether the other information is materially inconsistent with the consolidated financial statements or our knowledge obtained in the audit or otherwise appears to be materially misstated. If, based on the work we have performed, we conclude that there is a material misstatement of this other information, we are required to report that fact. We have nothing to report in this regard.
RESPONSIBILITIES OF DIRECTORS FOR THE CONSOLIDATED FINANCIAL STATEMENTS The directors are responsible for the preparation of the consolidated financial statements that give a true and fair view in accordance with IFRS Accounting Standards as issued by the IASB and the disclosure requirements of the Hong Kong Companies Ordinance, and for such internal control as the directors determine is necessary to enable the preparation of consolidated financial statements that are free from material misstatement, whether due to fraud or error. In preparing the consolidated financial statements, the directors are responsible for assessing the Group’s ability to continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern basis of accounting unless the directors either intend to liquidate the Group or to cease operations, or have no realistic alternative but to do so. The directors are responsible for overseeing the Group’s financial reporting process. The audit committee of Company (the “Audit Committee”) assists the directors in discharging their responsibility in this regard.
AUDITOR’S RESPONSIBILITIES FOR THE AUDIT OF THE CONSOLIDATED FINANCIAL STATEMENTS Our objectives are to obtain reasonable assurance about whether the consolidated financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditor’s report that includes our opinion solely to you, as a body, in accordance with our agreed terms of engagement, and for no other purpose. We do not assume responsibility towards or accept liability to any other person for the contents of this report.
- 34 -
INDEPENDENT AUDITOR’S REPORT
TO THE SHAREHOLDERS OF CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
AUDITOR’S RESPONSIBILITIES FOR THE AUDIT OF THE CONSOLIDATED FINANCIAL STATEMENTS (Cont’d) Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with ISAs will always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are considered material if, individually or in the aggregate, they could reasonably be expected to influence the economic decisions of users taken on the basis of these consolidated financial statements. As part of an audit in accordance with ISAs, we exercise professional judgment and maintain professional skepticism throughout the audit. We also: •
Identify and assess the risks of material misstatement of the consolidated financial statements, whether due to fraud or error, design and perform audit procedures responsive to those risks, and obtain audit evidence that is sufficient and appropriate to provide a basis for our opinion. The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control.
•
Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Group’s internal control.
•
Evaluate the appropriateness of accounting policies used and the reasonableness of accounting estimates and related disclosures made by the directors.
•
Conclude on the appropriateness of the directors’ use of the going concern basis of accounting and, based on the audit evidence obtained, whether a material uncertainty exists related to events or conditions that may cast significant doubt on the Group’s ability to continue as a going concern. If we conclude that a material uncertainty exists, we are required to draw attention in our auditor’s report to the related disclosures in the consolidated financial statements or, if such disclosures are inadequate, to modify our opinion. Our conclusions are based on the audit evidence obtained up to the date of our auditor’s report. However, future events or conditions may cause the Group to cease to continue as a going concern.
•
Evaluate the overall presentation, structure and content of the consolidated financial statements, including the disclosures, and whether the consolidated financial statements represent the underlying transactions and events in a manner that achieves fair presentation.
•
Plan and perform the group audit to obtain sufficient appropriate audit evidence regarding the financial information of the entities or business units within the Group as a basis for forming an opinion on the group financial statements. We are responsible for the direction, supervision and review of the audit work performed for purposes of the group audit. We remain solely responsible for our audit opinion.
- 35 -
INDEPENDENT AUDITOR’S REPORT
TO THE SHAREHOLDERS OF CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
AUDITOR’S RESPONSIBILITIES FOR THE AUDIT OF THE CONSOLIDATED FINANCIAL STATEMENTS (Cont’d) We communicate with the Audit Committee regarding, among other matters, the planned scope and timing of the audit and significant audit findings, including any significant deficiencies in internal control that we identify during our audit. We also provide the Audit Committee with a statement that we have complied with relevant ethical requirements regarding independence, and to communicate with them all relationships and other matters that may reasonably be thought to bear on our independence, and where applicable, actions taken to eliminate threats or safeguards applied. From the matter communicated with the directors, we determine the matter that was of most significance in the audit of the consolidated financial statements of the current period and is therefore the key audit matter. We describe this matter in our auditor’s report unless law or regulation precludes public disclosure about the matter or when, in extremely rare circumstances, we determine that a matter should not be communicated in our report because the adverse consequences of doing so would reasonably be expected to outweigh the public interest benefits of such communication.
BDO Limited
Certified Public Accountants PAK, Tak Lun, Amos Practising Certificate no. P06170 Hong Kong, March 30, 2026
- 36 -
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME FOR THE YEAR ENDED DECEMBER 31, 2025
NOTES
2025 US$’000
2024 US$’000
5
1,310,125 (626,134)
756,646 (569,726)
683,991
186,920
(59,934) (1,133) (32,799)
(47,566) (438) (15,722)
(93,866)
(63,726)
Income from operations
590,125
123,194
Other (expenses) income Foreign exchange loss, net Interest and other income Other expenses Finance costs
(349) 11,731 (22,538) (18,804)
(2,561) 5,109 (10,132) (22,390)
(29,960)
(29,974)
Revenue Cost of sales Mine operating earnings Expenses General and administrative expenses Exploration and evaluation expenditure Research and development expenses
6
7 8
Profit before income tax Income tax expense
9
560,165 (87,850)
93,220 (27,922)
Profit for the year
10
472,315
65,298
Other comprehensive income (expense) for the year Item that will not be reclassified to profit or loss: Fair value gain on equity instruments at fair value through other comprehensive income (“FVTOCI”) Item that may be reclassified subsequently to profit or loss: Exchange difference arising on translation of foreign operations
19
85,464
1,271
25,993
(8,422)
111,457
(7,151)
583,772
58,147
Total comprehensive income for the year
- 37 -
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME FOR THE YEAR ENDED DECEMBER 31, 2025
NOTE
Profit for the year attributable to: Non-controlling interests Owners of the Company
Total comprehensive income for the year attributable to: Non-controlling interests Owners of the Company
2025 US$’000
2024 US$’000
5,356 466,959
2,566 62,732
472,315
65,298
5,356 578,416
2,567 55,580
583,772
58,147
Earnings per share – Basic and Dilutive (US cents)
13
117.80
15.82
Weighted average number of common shares – Basic and Dilutive
13
396,413,753
396,413,753
- 38 -
CONSOLIDATED STATEMENT OF FINANCIAL POSITION AT DECEMBER 31, 2025
Current assets Cash and cash equivalents Restricted bank balances Term deposits Trade and other receivables Prepaid expenses and deposits Inventories
Non-current assets Prepaid expenses and deposits Right-of-use assets Equity instruments at FVTOCI Property, plant and equipment Intangible assets Other non-current assets
NOTES
2025 US$’000
2024 US$’000
14 14 14 15 16 17
399,402 34,162 305,884 8,246 1,794 294,536
183,779 66,698 118,246 7,393 1,513 290,405
1,044,024
668,034
74 104,519 133,875 1,339,447 724,647 9,949
30,095 45,957 48,411 1,375,498 752,414 15,570
2,312,511
2,267,945
3,356,535
2,935,979
181,828 10,063 217,004 28,454 1,417 25,253
175,132 8,099 148,696 – 469 8,650
464,019
341,046
16 18 19 20 21 22
Total assets Current liabilities Accounts and other payables and accrued expenses Contract liabilities Borrowings Entrusted loan payable Lease liabilities Tax liabilities
23 24 25 26 27
- 39 -
CONSOLIDATED STATEMENT OF FINANCIAL POSITION AT DECEMBER 31, 2025
2025 US$’000
2024 US$’000
580,005
326,988
2,892,516
2,594,933
25,419 287,981 – 12,628 135,665 19 93,778
32,822 565,656 27,823 459 112,000 19 69,948
555,490
808,727
1,019,509
1,149,773
1,229,061 266,985 813,095
1,229,061 99,737 433,640
Non-controlling interests
2,309,141 27,885
1,762,438 23,768
Total owners’ equity
2,337,026
1,786,206
Total liabilities and owners’ equity
3,356,535
2,935,979
NOTE
Net current assets Total assets less current liabilities Non-current liabilities Accounts and other payables and accrued expenses Borrowings Entrusted loan payable Lease liabilities Deferred tax liabilities Deferred income Environmental rehabilitation
23 25 26 27 9 28
Total liabilities Owners’ equity Share capital Reserves Retained profits
29
The consolidated financial statements on pages 37 to 118 were approved and authorised for issue by the Board of Directors on March 30, 2026 and are signed on its behalf by:
Chenguang Hou Director
Yingbin Ian He Director
- 40 -
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY FOR THE YEAR ENDED DECEMBER 31, 2025
Attributable to the owners of the Company Number of shares
Share capital US$’000
Equity reserve US$’000
Investments revaluation reserve US$’000
Exchange reserve US$’000
Statutory reserves US$’000 (Note)
Retained profits US$’000
396,413,753
1,229,061
11,179
26,318
(61,875)
121,800
Profit for the year Fair value gain on equity instruments at FVTOCI Exchange difference arising on translation
– – –
– – –
– – –
– 1,271 –
– – (8,423)
Total comprehensive income (expenses) for the year Transfer to statutory reserves – appropriation from retained profits Transfer to reserve fund – appropriation from retained profits Dividends paid to a non-controlling shareholder Other
–
–
–
1,271
–
–
–
– – –
– – –
396,413,753
Profit for the year Fair value gain on equity instruments at FVTOCI Exchange difference arising on translation Total comprehensive income for the year Transfer to statutory reserves – appropriation from retained profits Dividends paid to shareholders Dividends paid to a non-controlling shareholder
At January 1, 2024
At December 31, 2024
At December 31, 2025
Subtotal US$’000
Non– controlling interests US$’000
Total owners’ equity US$’000
380,375
1,706,858
20,883
1,727,741
– – –
62,732 – –
62,732 1,271 (8,423)
2,566 – 1
65,298 1,271 (8,422)
(8,423)
–
62,732
55,580
2,567
58,147
–
–
9,436
(9,436)
–
–
–
– – –
– – –
– – –
31 – –
(31) – –
– – –
– (1,250) 1,568
– (1,250) 1,568
1,229,061
11,179
27,589
(70,298)
131,267
433,640
1,762,438
23,768
1,786,206
– – –
– – –
– – –
– 85,464 –
– – 25,993
– – –
466,959 – –
466,959 85,464 25,993
5,356 – –
472,315 85,464 25,993
–
–
–
85,464
25,993
–
466,959
578,416
5,356
583,772
– – –
– – –
– – –
– – –
– – –
55,791 – –
(55,791) (31,713) –
– (31,713) –
– – (1,239)
– (31,713) (1,239)
396,413,753
1,229,061
11,179
113,053
(44,305)
187,058
813,095
2,309,141
27,885
2,337,026
Note: Statutory reserves which consist of (1) appropriations from the profit after taxation of the subsidiaries established in the People’s Republic of China (“PRC”) and (2) provision of safety production fund of the subsidiaries engaged in the exploration and development in the mining industry, form part of the equity of PRC subsidiaries. In accordance with the PRC Company Law and the Articles of Association of the PRC subsidiaries, the PRC subsidiaries are required to appropriate an amount equal to a minimum of 10% of their profits after taxation each year to a statutory reserve or reserve fund until the reserve reaches 50% of the registered capital of the respective subsidiaries. Pursuant to the Caizi (2022) No.136 on implementation of entities’ safety production funds management, effective on November 21, 2022, and in accordance with the Articles of Association of the PRC subsidiaries, the PRC subsidiaries are required to appropriate an amount, equal to RMB5 per ton multiplied by the volume of ore mined less actual payment, each year to a statutory reserve and utilise an amount when the actual payment is more than RMB5 per ton multiplied by the volume of ore mined.
- 41 -
CONSOLIDATED STATEMENT OF CASH FLOWS FOR THE YEAR ENDED DECEMBER 31, 2025
2025 US$’000
2024 US$’000
560,165
93,220
29,083 131,998 4,918 (8,705) (3,026) 18,804
19,906 121,285 4,776 (3,114) (2,095) 22,390
1,434 5,879 – 2,369 3,956
2,051 – 291 620 1,403
746,875
260,733
Change in operating working capital items: Trade and other receivables Inventories Contract liabilities Restricted bank balances Accounts and other payables and accrued expenses
(2,477) (4,131) 1,964 32,536 (707)
6,470 226 7,954 – 68,414
Cash generated from operations Environmental rehabilitation expense paid Interest paid PRC income tax paid
774,060 (692) (15,802) (47,582)
343,797 (7,841) (19,538) (9,522)
Net cash from operating activities
709,984
306,896
Operating activities Profit before income tax Items not requiring use of cash and cash equivalents: Amortisation of mining rights Depreciation of property, plant and equipment Depreciation of right-of-use assets Interest income Dividend income Finance costs Provision for impairment of: – trade and other receivables – other non-current assets Write-down of inventories Loss on disposal of property, plant and equipment Unrealised foreign exchange loss, net
- 42 -
CONSOLIDATED STATEMENT OF CASH FLOWS FOR THE YEAR ENDED DECEMBER 31, 2025
2025 US$’000
2024 US$’000
Investing activities Interest received Dividends received from equity investment at FVTOCI Payment for acquisition of mining rights Payment for acquisition of property, plant and equipment Proceeds from disposal of property, plant and equipment Deposits paid for water treatment project Payment for land use right Payment for deposit for acquisition of land use right Payment for acquisition of intangible assets Payment for right-of-use assets on or before commencement date Placement of term deposits Release of term deposits
8,705 3,026 – (50,136) 12 – (19,773) – (150) (874) (306,638) 119,000
3,114 2,095 (1,226) (48,286) – (6,096) (11,217) (23,906) – – (133,395) 14,042
Net cash used in investing activities
(246,828)
(204,875)
Financing activities Repayments of borrowings Proceeds from borrowings Dividends paid to a non-controlling shareholder Dividends paid to shareholders Repayments of lease liabilities
(306,219) 86,000 (1,239) (31,713) (514)
(156,955) 142,633 (1,250) – (599)
Net cash used in financing activities
(253,685)
(16,171)
Net increase in cash and cash equivalents Cash and cash equivalents, beginning of year Effect of foreign exchange rate changes on cash and cash equivalents
209,471 183,779 6,152
85,850 97,237 692
Cash and cash equivalents, end of year
399,402
183,779
- 43 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
GENERAL INFORMATION 1.1 General information China Gold International Resources Corp. Ltd. (the “Company”) is a publicly listed company incorporated in British Columbia, Canada on May 31, 2000 with limited liability under the legislation of the Province of British Columbia and its shares are listed on the Toronto Stock Exchange and The Stock Exchange of Hong Kong Limited (the “Stock Exchange”). The Company together with its subsidiaries (collectively referred to as the “Group”) is principally engaged in the acquisition, exploration, development and mining of mineral resources in the PRC. Particulars of the subsidiaries of the Company are set out in note 37. The Group considers that China National Gold Group Co., Ltd. (“CNG”), a state owned company registered in Beijing, the PRC, which is controlled by State-owned Assets Supervision and Administration Commission of the State Council of the PRC, is able to exercise significant influence over the Company. The head office, principal address and registered and records office of the Company are located at Suite 1780, 400 Burrard Street, Vancouver, British Columbia, Canada, V6C 3A6. The consolidated financial statements are presented in United States Dollars (“US$”) which is also the functional currency of the Company.
APPLICATION OF NEW AND AMENDMENTS TO IFRS ACCOUNTING STANDARDS Amendments to IFRS Accounting Standards that are mandatorily effective for the current year In the current year, the Group has applied the following amendments to IFRS Accounting Standards issued by International Accounting Standards Board (the “IASB”) for the first time, which is mandatorily effective for the Group’s annual period beginning on January 1, 2025 for the preparation of the consolidated financial statements: Amendments to IAS 21
Lack of Exchangeability
As the currencies that the Group had transacted in and the functional currencies of overseas entities for translation into the Group’s presentation currency were exchangeable, the application of the amendments to IFRS Accounting Standards in the current year has had no impact on the Group’s financial positions and performance for the current and prior years and/or on the disclosures set out in these consolidated financial statements.
- 44 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
APPLICATION OF NEW AND AMENDMENTS TO IFRS ACCOUNTING STANDARDS (Cont’d) New and amendments to IFRS Accounting Standards in issue but not yet effective The Group has not early applied the following new and amendments to IFRS Accounting Standards that have been issued but are not yet effective: Amendments to IFRS 9 and IFRS 7 Amendments to IFRS 9 and IFRS 7 Amendments to IFRS 10 and IAS 28 IFRS 18 IFRS 19 and its amendments Amendments to IAS 21 Amendments to IFRS Accounting Standards
Amendments to the Classification and Measurement of Financial Instruments2 Contracts Referencing Nature – dependent Electricity2 Sale or Contribution of Assets between an Investor and its Associate or Joint Venture1 Presentation and Disclosure in Financial Statement3 Subsidiaries without Public Accountability: Disclosure3 Translation to a Hyperinflationary Presentation Currency3 Annual Improvement to IFRS Accounting Standards – Volume 112
1
No mandatory effective date yet determined but available for adoption
2
Effective for annual periods beginning on or after January 1, 2026
3
Effective for annual periods beginning on or after January 1, 2027
Except for the new IFRS Accounting Standard mentioned below, the directors of the Company anticipate that the application of other new and amendments to IFRS Accounting Standards will have no material impact on the consolidated financial statements in the foreseeable future.
IFRS 18 Presentation and Disclosure in Financial Statements IFRS 18 Presentation and Disclosure in Financial Statements, which sets out requirements on presentation and disclosures in financial statements, will replace IAS 1 Presentation of Financial Statements. This new IFRS Accounting Standard, while carrying forward many of the requirements in IAS 1, introduces new requirements to present specified categories and defined subtotals in the statement of profit or loss; provide disclosures on management-defined performance measures in the notes to the financial statements and improve aggregation and disaggregation of information to be disclosed in the financial statements. In addition, some IAS 1 paragraphs have been moved to IAS 8 Accounting Policies, Changes in Accounting Estimates and Errors and IFRS 7 Financial Instruments: Disclosures. Minor amendments to IAS 7 Statement of Cash Flows and IAS 33 Earnings per Share are also made. IFRS 18, and amendments to other standards, will be effective for annual periods beginning on or after 1 January 2027, with early application permitted. The application of the new standard is expected to affect the presentation of the statement of profit or loss and disclosures in the future financial statements. The Group is in the process of assessing the detailed impact of IFRS 18 on the Group’s consolidated financial statements.
- 45 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION Basis of preparation of consolidated financial statements The consolidated financial statements have been prepared in accordance with IFRS Accounting Standards issued by the IASB. For the purpose of preparation of the consolidated financial statements, information is considered material if such information is reasonably expected to influence decisions made by primary users. In addition, the consolidated financial statements include applicable disclosures required by the Rules Governing the Listing of Securities on the Stock Exchange (“Listing Rules”) and by the Hong Kong Companies Ordinance (“Co”). The directors of the Company have, at the time of approving the consolidated financial statements, a reasonable expectation that the Group has adequate resources to continue in operational existence for the foreseeable future. Thus they continue to adopt the going concern basis of accounting in preparing the consolidated financial statements.
Material accounting policy information Basis of consolidation The consolidated financial statements incorporate the financial statements of the Company and entities controlled by the Company and its subsidiaries. Control is achieved when the Company: •
has power over the investee;
•
is exposed, or has rights, to variable returns from its involvement with the investee; and
•
has the ability to use its power to affect its returns.
The Group reassesses whether or not it controls an investee if facts and circumstances indicate that there are changes to one or more of the three elements of control listed above. Consolidation of a subsidiary begins when the Group obtains control over the subsidiary and ceases when the Group loses control of the subsidiary. Profit or loss and each item of other comprehensive income are attributed to the owners of the Company and to the non-controlling interests. Total comprehensive income of subsidiaries is attributed to the owners of the Company and to the non-controlling interests even if this results in the non-controlling interests having a deficit balance. When necessary, adjustments are made to the financial statements of subsidiaries to bring their accounting policies in line with the Group’s accounting policies. All intragroup assets and liabilities, equity, income, expenses and cash flows relating to transactions between members of the Group are eliminated in full on consolidation. Non-controlling interests in subsidiaries are presented separately from the Group’s equity therein, which represent present ownership interests entitling their holders to a proportionate share of net assets of the relevant subsidiaries upon liquidation.
- 46 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Revenue from contracts with customers The Group recognises revenue when (or as) a performance obligation is satisfied, i.e. when “control” of the goods or services underlying the particular performance obligation is transferred to the customer. A performance obligation represents a good or service (or a bundle of goods or services) that is distinct or a series of distinct goods or services that are substantially the same. Control is transferred over time and revenue is recognised over time by reference to the progress towards complete satisfaction of the relevant performance obligation if one of the following criteria is met: •
the customer simultaneously receives and consumes the benefits provided by the Group’s performance as the Group performs;
•
the Group’s performance creates or enhances an asset that the customer controls as the Group performs; or
•
the Group’s performance does not create an asset with an alternative use to the Group and the Group has an enforceable right to payment for performance completed to date.
Otherwise, revenue is recognised at a point in time when the customer obtains control of the distinct good or service. A contract asset represents the Group’s right to consideration in exchange for goods or services that the Group has transferred to a customer that is not yet unconditional. It is assessed for impairment in accordance with IFRS 9 Financial Instruments. In contrast, a receivable represents the Group’s unconditional right to consideration, i.e. only the passage of time is required before payment of that consideration is due. A contract liability represents the Group’s obligation to transfer goods or services to a customer for which the Group has received consideration (or an amount of consideration is due) from the customer. A contract asset and a contract liability relating to the same contract are accounted for and presented on a net basis. For contracts where the period between payment and transfer of the associated goods or services is less than one year, the Group applies the practical expedient for not adjusting the transaction price for any significant financing component. Revenue is recognised at a point in time when control of the gold doré bars, copper and other by-products is passed to customers, i.e. when the products are delivered and titles have passed to customers.
- 47 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Leases The Group assesses whether a contract is or contains a lease based on the definition under IFRS 16 at inception of the contract. Such contract will not be reassessed unless the terms and conditions of the contract are subsequently changed.
The Group as a lessee Right-of-use assets The cost of right-of-use asset includes: •
the amount of the initial measurement of the lease liability;
•
any lease payments made at or before the commencement date, less any lease incentives received;
•
any initial direct costs incurred by the Group; and
•
an estimate of costs to be incurred by the Group in dismantling and removing the underlying assets, restoring the site on which it is located or restoring the underlying asset to the condition required by the terms and conditions of the lease.
Right-of-use assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any remeasurement of lease liabilities. Right-of-use assets in which the Group is reasonably certain to obtain ownership of the underlying leased assets at the end of the lease term are depreciated from commencement date to the end of the useful life. Otherwise, rightof-use assets are depreciated on a straight-line basis over the shorter of its estimated useful life and the lease term. The Group presents right-of-use assets as a separate line item on the consolidated statement of financial position.
- 48 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Foreign currencies In preparing the financial statements of each individual group entity, transactions in currencies other than the functional currency of that entity (foreign currencies) are recognised at the rates of exchanges prevailing on the dates of the transactions. At the end of the reporting period, monetary items denominated in foreign currencies are retranslated at the rates prevailing at that date. Non-monetary items carried at fair value that are denominated in foreign currencies are retranslated at the rates prevailing on the date when the fair value was determined. When a fair value gain or loss on a non-monetary item is recognised in profit or loss, any exchange component of that gain or loss is also recognised in profit or loss. When a fair value gain or loss on a non-monetary item is recognised in other comprehensive income, any exchange component of that gain or loss is also recognised in other comprehensive income. Non-monetary items that are measured in terms of historical cost in a foreign currency are not retranslated. Exchange differences arising on the settlement of monetary items, and on the retranslation of monetary items, are recognised in profit or loss in the period in which they arise. For the purposes of presenting the consolidated financial statements, the assets and liabilities of the Group’s operations are translated into the presentation currency of the Group (i.e. US$) using exchange rates prevailing at the end of each reporting period. Income and expenses items are translated at the average exchange rates for the period. Exchange differences arising, if any, are recognised in other comprehensive income and accumulated in equity under the heading of exchange reserve (attributed to non-controlling interests as appropriate).
Borrowing costs Borrowing costs directly attributable to the acquisition, construction or production of qualifying assets, which are assets that necessarily take a substantial period of time to get ready for their intended use or sale, are added to the cost of those assets until such time as the assets are substantially ready for their intended use or sale. All other borrowing costs are recognised in profit or loss in the period in which they are incurred.
Taxation Income tax expense represents the sum of current and deferred income tax expense. The tax currently payable is based on taxable profit for the year. Taxable profit differs from profit/(loss) before income tax because of income or expense that are taxable or deductible in other years and items that are never taxable or deductible. The Group’s liability for current tax is calculated using tax rates that have been enacted or substantively enacted by the end of the reporting period.
- 49 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Taxation (Cont’d) Deferred tax is recognised on temporary differences between the carrying amounts of assets and liabilities in the consolidated financial statements and the corresponding tax bases used in the computation of taxable profit. Deferred tax liabilities are generally recognised for all taxable temporary differences. Deferred tax assets are generally recognised for all deductible temporary differences to the extent that it is probable that taxable profits will be available against which those deductible temporary differences can be utilised. Such deferred tax assets and liabilities are not recognised if the temporary difference arises from the initial recognition (other than in a business combination) of assets and liabilities in a transaction that affects neither the taxable profit nor the accounting profit and at the time of the transaction does not give rise to equal taxable and deductible temporary differences. Deferred tax liabilities are recognised for taxable temporary differences associated with investments in subsidiaries, except where the Group is able to control the reversal of the temporary difference and it is probable that the temporary difference will not reverse in the foreseeable future. Deferred tax assets arising from deductible temporary differences associated with such investments are only recognised to the extent that it is probable that there will be sufficient taxable profits against which to utilise the benefits of the temporary differences and they are expected to reverse in the foreseeable future. The carrying amount of deferred tax assets is reviewed at the end of each reporting period and reduced to the extent that it is no longer probable that sufficient taxable profits will be available to allow all or part of the asset to be recovered. Deferred tax assets and liabilities are measured at the tax rates that are expected to apply in the period in which the liability is settled or the asset is realised, based on tax rate (and tax laws) that have been enacted or substantively enacted by the end of the reporting period. The measurement of deferred tax liabilities and assets reflects the tax consequences that would follow from the manner in which the Group expects, at the end of the reporting period, to recover or settle the carrying amount of its assets and liabilities. For ultimate costs incurred for provisions for environmental rehabilitation, the Group applies IAS 12 requirements to the provisions for environmental rehabilitation and the related assets separately. The Group recognises a deferred tax asset related to provisions for environmental rehabilitation to the extent that it is probable that taxable profit will be available against which the deductible temporary difference can be utilised and a deferred tax liability for all taxable temporary differences. Deferred tax assets and liabilities are offset when there is a legally enforceable right to set off current tax assets against current tax liabilities and when they relate to income taxes levied to the same taxable entity by the same taxation authority. Current and deferred tax are recognised in profit or loss.
- 50 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Cash and cash equivalents Cash and cash equivalents presented on the consolidated statement of financial position comprises of cash on hand and demand deposits.
Inventories Inventories are stated at the lower of cost and net realisable value. Costs of inventories are determined using the weighted average cost method. Net realisable value is the estimated selling price in the ordinary course of business less the estimated costs of completion and the estimated costs necessary to make the sale. Costs necessary to make the sale include incremental costs directly attributable to the sale and non-incremental costs which the Group must incur to make the sale.
Gold in process inventory Gold in process inventory consists of gold contained in the ore on leach pads and in-circuit material within processing operations. Production costs are capitalised and included in gold in process inventory based on the current mining and processing cost incurred up to the point prior to the refining process including the cost of raw materials and direct labour; mine-site overhead expenses; stripping costs; and allocated indirect costs, including depreciation and depletion of mining interests.
Gold doré bars inventory Gold doré bar is gold awaiting refinement and gold refined and ready for sales. The recovery of gold from ore is achieved through a heap leaching process. Under this method, ore is placed on leach pads where it is treated with a chemical solution which dissolves the gold contained in the ore. The resulting “pregnant” solution is further processed in a plant where the gold is recovered. Costs are subsequently recycled from ore on leach pads as ounces of gold are recovered based on the average cost per recoverable ounce on the leach pad. Estimates of recoverable gold on the leach pads are calculated from the quantities of ore placed on the leach pads (measured in tonnes added to the leach pads), the grade of the ore placed on the leach pads (based on assay data), and a recovery percentage (based on ore type).
Others Copper inventory is copper and other by-products after metallurgical processing and ready for sales. Consumables used in operations, such as fuel, chemicals, and reagents and spare parts inventory are valued at the lower of cost or net realisable value.
- 51 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Inventories (Cont’d) Provisions Provisions are recognised when the Group has a present obligation (legal or constructive) as a result of a past event, it is probable that the Group will be required to settle that obligation, and a reliable estimate can be made of the amount of the obligation. The amount recognised as a provision is the best estimate of the consideration required to settle the present obligation at the end of the reporting period, taking into account the risks and uncertainties surrounding the obligation. When a provision is measured using the cash flows estimated to settle the present obligation, its carrying amount is the present value of those cash flows (where the effect of the time value of money is material).
Contingent liabilities A contingent liability is a present obligation arising from past events but is not recognised because it is not probable that an outflow of resources embodying economic benefits will be required to settle the obligation. Where the Group is jointly and severally liable for an obligation, the part of the obligation that is expected to be met by other parties is treated as a contingent liability and it is not recognised in the consolidated financial statements. The Group assesses continually to determine whether an outflow of resources embodying economic benefits has become probable. If it becomes probable that an outflow of future economic benefits will be required for an item previously dealt with as a contingent liability, a provision is recognised in the consolidated financial statements in the reporting period in which the change in probability occurs, except in the extremely rare circumstances where no reliable estimate can be made.
Environmental rehabilitation An obligation to incur restoration, rehabilitation and environmental costs arises when environmental disturbance is caused by the development or ongoing production of a mining property. Such costs arising from the decommissioning of plant and other site preparation work, discounted to their net present value, are provided for and capitalised as part of the related property, plant and equipment at the start of each project, as soon as the obligation to incur such costs arises. These costs are recognised in profit or loss over the life of the operation, through depreciation of the asset. Costs for restoration of subsequent site damage which is created on an ongoing basis during production are recognised in profit or loss. Changes in the measurement of a liability relating to the decommissioning of plant or other site preparation work that result from changes in the estimated timing or amount of the cash flow, including the effects of inflation and movements in foreign exchange rates, revisions to estimated reserves, resources and lives of operations, or a change in the discount rate, are added to, or deducted from, the cost of the related asset in the period it occurred. The periodic unwinding of discount is recognised in profit or loss as a finance cost as it occurs. If a decrease in the liability exceeds the carrying amount of the asset, the excess is recognised immediately in profit or loss. If the asset value is increased and there is an indication that the revised carrying value is not recoverable, an impairment test is performed in accordance with the Group’s accounting policy.
- 52 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Property, plant and equipment Property, plant and equipment are tangible assets that are held for use in the production or supply of goods or services, or for administrative purposes (other than construction in progress as described below). Property, plant and equipment are stated in the consolidated statement of financial position at cost less subsequent accumulated depreciation and subsequent accumulated impairment losses, if any. Depreciation is recognised so as to write off the cost of assets other than properties under construction less their residual values over their estimated useful lives, using the straight-line method. The estimated useful lives, residual values and depreciation method are reviewed at the end of each reporting period, with the effect of any changes in estimate accounted for on a prospective basis. Assets under construction in progress are carried at cost, less any recognised impairment loss. Costs include any costs directly attributable to bringing the asset to the location and condition necessary for it to be capable of operating in the manner intended by management, including costs of testing whether the related assets is functioning properly and, for qualifying assets, borrowing costs capitalised in accordance with the Group’s accounting policy. Depreciation of these assets, on the same basis as other property assets, commences when the assets are ready for their intended use. When the Group makes payments for ownership interests of properties which includes both leasehold land and building elements, the entire consideration is allocated between the leasehold land and the building elements in proportion to the relative fair values at initial recognition. To the extent the allocation of the relevant payments can be made reliably, interest in leasehold land is presented as “right-of-use assets” in the consolidated statement of financial position. When the consideration cannot be allocated reliably between non-lease building element and undivided interest in the underlying leasehold land, the entire properties are classified as property, plant and equipment. An item of property, plant and equipment is derecognised upon disposal or when no future economic benefits are expected to arise from the continued use of the asset. Any gain or loss arising on the disposal or retirement of an item of property, plant and equipment is determined as the difference between the sales proceeds and the carrying amount of the asset and is recognised in profit or loss.
Exploration and evaluation expenditure Drilling and related costs incurred on sites without an existing mine and on areas outside the boundary of a known mineral deposit which contains proven and probable reserves are exploration and evaluation expenditure and are expensed as incurred up to the date on which costs incurred are economically recoverable. Further exploration and evaluation expenditures, subsequent to the establishment of economic recoverability, are capitalised and included in the carrying amount of the mineral assets.
- 53 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Property, plant and equipment (Cont’d) Exploration and evaluation expenditure (Cont’d) The Management evaluates the following criteria in its assessment of economic recoverability and probability of future economic benefit: •
Geology – whether or not there is sufficient geologic and economic certainty of being able to convert a residual mineral deposit into a proven and probable reserve at a development stage or production stage mine, based on the known geology and metallurgy. A history of conversion of resources to reserves at operating mines is used to support the likelihood of conversion.
•
Scoping – there is a scoping study or preliminary feasibility study that demonstrates the additional resources will generate a positive commercial outcome. Known metallurgy provides a basis for concluding there is a significant likelihood of being able to recoup the incremental costs of extraction and production.
•
Accessible facilities – mining property can be processed economically at accessible mining and processing facilities where applicable.
•
Life of mine plans – an overall life of mine plan and economic model to support the mine and the economic extraction of resources/reserves exists. A long-term life of mine plan, and supporting geological model identifies the drilling and related development work required to expand or further define the existing orebody.
•
Authorizations – operating permits and feasible environmental programs exist or are obtainable.
Therefore prior to capitalising exploration drilling and related costs, the Management determines that the following conditions have been met that will contribute to future cash flows: •
There is a probable future benefit that will contribute to future cash inflows;
•
The Group can obtain the benefit and controls access to it;
•
The transaction or event giving rise to the future benefit has already occurred; and
•
Costs incurred can be measured reliably.
Development expenditure Drilling and related costs incurred to define and delineate a mineral deposit are capitalised as part of mineral assets in the period incurred, when the Management determines that there is sufficient evidence that the expenditure will result in a probable future economic benefit to the Group.
- 54 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Property, plant and equipment (Cont’d) Production expenditure A mine that is under construction is determined to enter the production stage when the project is in the position and condition necessary for it to be capable of operating in the manner intended by the Management. Therefore, such costs incurred are capitalised as part of the mineral assets. Mine development costs incurred to maintain current production are included in cost of inventories. For those areas being developed which will be mined in future periods, the costs incurred are capitalised and depleted when the related mining area is mined.
Depreciation Mineral assets are depreciated using the unit-of-production method based on the actual production volume over the estimated total recoverable ounces contained in proven and probable reserves at the related mine when the mine is capable of operating as intended by the Management. The Management reviews the estimated total recoverable ounces contained in proven and probable reserves at the end of each reporting period and when events and circumstances indicate that such a review should be made. Changes to estimated total recoverable ounces contained in proven and probable reserves are accounted for prospectively. Assets under construction are not depreciated until they are substantially complete and available for their intended use. Leasehold improvements are depreciated over the shorter of the lease term and the estimated useful lives of the assets.
Mining rights Mining rights are amortised using the unit-of-production method based on the actual production volume over the estimated total recoverable ounces contained in proven and probable reserves at the related mine.
Mining rights acquired in a business combination Mining rights acquired in a business combination are recognised separately from goodwill and are initially recognised at their fair value at the acquisition date (which is regarded as their cost). Subsequent to initial recognition, mining rights with finite useful lives are carried at costs less accumulated amortisation and any accumulated impairment losses. Amortisation is provided using the unit-of-production method based on the actual production volume over the estimated total proven and probable reserves of the ore mines.
Variable payments for acquiring mining rights that are not part of a business combination Variable payments that are dependent on the Group’s future activity (including payments based on sales, revenues or outputs produced) are recognised in profit or loss in the period in which they arise.
- 55 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Other non-current assets The right to receive a block of buildings and twenty car parks included under “other non-current assets” is carried at cost less accumulated impairment, if any.
Impairment of property, plant and equipment, right-of-use assets, mining rights and other non-current assets At the end of the reporting period, the Group reviews the carrying amounts of its property, plant and equipment, right-of-use assets, mining rights and other non-current assets to determine whether there is any indication that those assets have suffered an impairment loss. If any such indication exists, the recoverable amount of the relevant asset is estimated in order to determine the extent of the impairment loss, if any. The recoverable amounts of property, plant and equipment, right-of-use assets, mining rights and other non-current assets are estimated individually. When it is not possible to estimate the recoverable amount individually, the Group estimates the recoverable amount of the cash-generating unit (“CGU”) to which the asset belongs. In testing a CGU for impairment, corporate assets are allocated to the relevant CGU when a reasonable and consistent basis of allocation can be established, or otherwise they are allocated to the smallest group of CGUs for which a reasonable and consistent allocation basis can be established. The recoverable amount is determined for the CGU or group of CGUs to which the corporate asset belongs, and is compared with the carrying amount of the relevant CGU or group of CGUs. Recoverable amount is the higher of fair value less costs of disposal and value in use (“VIU”). In assessing VIU, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the asset (or a CGU) for which the estimates of future cash flows have not been adjusted. If the recoverable amount of an asset (or a CGU) is estimated to be less than its carrying amount, the carrying amount of the asset (or a CGU) is reduced to its recoverable amount. For corporate assets or portion of corporate assets which cannot be allocated on a reasonable and consistent basis to a CGU, the Group compares the carrying amount of a group of CGUs, including the carrying amounts of the corporate assets or portion of corporate assets allocated to that group of CGUs, with the recoverable amount of the group of CGUs. In allocating the impairment loss, the impairment loss is allocated first to reduce the carrying amount of any goodwill (if applicable) and then to the other assets on a pro-rata basis based on the carrying amount of each asset in the unit or the group of CGUs. The carrying amount of an asset is not reduced below the highest of its fair value less costs of disposal (if measurable), its VIU (if determinable) and zero. The amount of the impairment loss that would otherwise have been allocated to the asset is allocated pro rata to the other assets of the unit or the group of CGUs. An impairment loss is recognised immediately in profit or loss. Where an impairment loss subsequently reverses, the carrying amount of the asset (or a CGU or a group of CGUs) is increased to the revised estimate of its recoverable amount, but so that the increased carrying amount does not exceed the carrying amount that would have been determined had no impairment loss been recognised for the asset (or a CGU or a group of CGUs) in prior years. A reversal of an impairment loss is recognised immediately in profit or loss.
- 56 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Research and development expenses Expenditure on research activities is recognised as an expense in the period in which it is incurred. Development expenditure that is not recognised as an internally-generated intangible asset is recognised in profit or loss in the period in which it is incurred.
Financial instruments Financial assets and financial liabilities are initially measured at fair value except for trade receivables arising from contracts with customers which are initially measured in accordance with IFRS 15. Transaction costs that are directly attributable to the acquisition or issue of financial assets and financial liabilities (other than financial assets or financial liabilities at fair value through profit or loss (“FVTPL”)) are added to or deducted from the fair value of financial assets or financial liabilities, as appropriate, on initial recognition. Transaction costs directly attributable to the acquisition of financial assets or financial liabilities at FVTPL are recognised immediately in profit or loss. The effective interest method is a method of calculating the amortised cost of a financial asset or financial liability and of allocating interest income and interest expense over the relevant period. The effective interest rate is the rate that exactly discounts estimated future cash receipts and payments (including all fees and points paid or received that form an integral part of the effective interest rate, transaction costs and other premiums or discounts) through the expected life of the financial asset or financial liability, or, where appropriate, a shorter period, to the net carrying amount on initial recognition.
Financial assets Classification and subsequent measurement of financial assets Financial assets that meet the following conditions are subsequently measured at amortised cost: •
the financial asset is held within a business model whose objective is to collect contractual cash flows; and
•
the contractual terms give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding.
Debt instruments that meet the following conditions are subsequently measured at FVTOCI: •
the financial asset is held within a business model whose objective is achieved by both collecting contractual cash flows and selling the financial assets; and
•
the contractual terms give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding.
- 57 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Financial instruments (Cont’d) Financial assets (Cont’d) Classification and subsequent measurement of financial assets (Cont’d) All other financial assets are subsequently measured at FVTPL, except that at initial recognition of a financial asset the Group may irrevocably elect to present subsequent changes in fair value of an equity investment in other comprehensive income if that equity investment is neither held for trading nor contingent consideration recognised by an acquirer in a business combination to which IFRS 3 Business Combinations applies. In addition, the Group may irrevocably designate a financial asset that is required to be measured at the amortised cost or FVTOCI as measured at FVTPL if doing so eliminates or significantly reduces an accounting mismatch. Equity instruments designated as at FVTOCI Investments in equity instruments at FVTOCI are subsequently measured at fair value with gains and losses arising from changes in fair value recognised in other comprehensive income and accumulated in the investments revaluation reserve; and are not subject to impairment assessment. The cumulative gain or loss will not be reclassified to profit or loss on disposal of the equity investments, and will be transferred to retained profits. Dividends from these investments in equity instruments are recognised in profit or loss when the Group’s right to receive the dividends is established, unless the dividends clearly represent a recovery of part of the cost of the investment. Dividends are included in the “interest and other income” line item in profit or loss. Impairment of financial assets subject to impairment assessment under IFRS 9 The Group performs impairment assessment under expected credit loss (“ECL”) model on financial assets (including trade receivables, other receivables, amounts due from related companies, term deposits, cash and cash equivalents and restricted balances) which are subject to impairment assessment under IFRS 9. The amount of ECL is updated at each reporting date to reflect changes in credit risk since initial recognition. Simplified approach For trade receivables that do not contain a significant financing component, the Group applies simplified approach in calculating ECLs. Under the simplified approach, the Group does not track changes in credit risk, but instead recognises a loss allowance based on lifetime ECLs at each reporting date. Lifetime ECL represents the ECL that will result from all possible default events over the expected life of the relevant instrument. In contrast, 12-month ECL (“12m ECL”) represents the portion of lifetime ECL that is expected to result from default events that are possible within 12 months after the reporting date. Assessments are done based on the Group’s historical credit loss experience, adjusted for factors that are specific to the debtors, general economic conditions and an assessment of both the current conditions at the reporting date as well as the forecast of future conditions.
- 58 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Financial instruments (Cont’d) Financial assets (Cont’d) Impairment of financial assets subject to impairment assessment under IFRS 9 (Cont’d) Other than trade receivables, at each reporting date, the Group assesses whether the credit risk on a financial instrument has increased significantly since initial recognition. When making the assessment, the Group compares the risk of a default occurring on the financial instrument as at the reporting date with the risk of a default occurring on the financial instrument as at the date of initial recognition and considers reasonable and supportable information that is available without undue cost or effort, including historical and forward-looking information. The Group considers that there has been a significant increase in credit risk when contractual payments are more than 30 days past due. The Group considers a financial asset in default when contractual payments are 90 days past due. However, in certain cases, the Group may also consider a financial asset to be in default when internal or external information indicates that the Group is unlikely to receive the outstanding contractual amounts in full before taking into account any credit enhancements held by the Group. A financial asset is written off when there is no reasonable expectation of recovering the contractual cash flows. The measurement of ECL is a function of the probability of default, loss given default (i.e. the magnitude of the loss if there is a default) and the exposure at default. The assessment of the probability of default and loss given default is based on historical data and forward-looking information. Estimation of ECL reflects an unbiased and probabilityweighted amount that is determined with the respective risks of default occurring as the weights. Generally, the ECL is the difference between all contractual cash flows that are due to the Group in accordance with the contract and the cash flows that the Group expects to receive, discounted at the effective interest rate determined at initial recognition. The Group recognises an impairment gain or loss in profit or loss for all financial instruments by adjusting their carrying amount, with the exception of trade receivables where the corresponding adjustment is recognised through a loss allowance account. Foreign exchange gains and losses The carrying amount of financial assets that are denominated in a foreign currency is determined in that foreign currency and translated at the spot rate at the end of each reporting period. Specifically: •
For financial assets measured at amortised cost, exchange differences are recognised in profit or loss in the “foreign exchange loss, net” line item in profit or loss;
•
For equity instruments measured at FVTOCI, exchange differences are recognised in other comprehensive income in the investments revaluation reserve.
- 59 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Financial instruments (Cont’d) Financial assets (Cont’d) Derecognition of financial assets The Group derecognises a financial asset only when the contractual rights to the cash flows from the asset expire, or when it transfers the financial asset and substantially all the risks and rewards of ownership of the asset to another entity. On derecognition of a financial asset measured at amortised cost, the difference between the asset’s carrying amount and the sum of the consideration received and receivable is recognised in profit or loss. On derecognition of an investment in equity instrument which the Group has elected on initial recognition to measure at FVTOCI, the cumulative gain or loss previously accumulated in the investments revaluation reserve is not reclassified to profit or loss, but is transferred to retained profits.
Financial liabilities and equity instruments Classification as debt or equity Debt and equity instruments issued by a group entity are classified as either financial liabilities or as equity in accordance with the substance of the contractual arrangements and the definitions of a financial liability and an equity instrument. Equity instruments An equity instrument is any contract that evidences a residual interest in the assets of an entity after deducting all of its liabilities. Equity instruments issued by the Company are recognised at the proceeds received, net of direct issue costs. Financial liabilities at amortised cost Financial liabilities including borrowings, entrusted loan payable, accounts and other payables are initially measured at fair value, net of transaction costs, and are subsequently measured at amortised cost using the effective interest method. Foreign exchange gains and losses For financial liabilities that are denominated in a foreign currency and are measured at amortised cost at the end of each reporting period, the foreign exchange gains and losses are determined based on the amortised cost of the instruments. These foreign exchange gains and losses are recognised in the “foreign exchange loss, net” line item in profit or loss. Derecognition of financial liabilities The Group derecognises financial liabilities when, and only when, the Group’s obligations are discharged, cancelled or have expired. The difference between the carrying amount of the financial liability derecognised and the consideration paid and payable is recognised in profit or loss.
- 60 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
CRITICAL ACCOUNTING JUDGEMENT AND KEY SOURCES OF ESTIMATION UNCERTAINTY In the application of the Group’s accounting policies, the directors of the Company are required to make judgements, estimates and assumptions about the carrying amounts of assets and liabilities that are not readily apparent from other sources. The estimates and underlying assumptions are based on historical experience and other factors that are considered to be relevant. Actual results may differ from these estimates. The estimates and underlying assumptions are reviewed on an on-going basis. Revisions to accounting estimates are recognised in the period in which the estimate is revised if the revision affects only that period, or in the period of the revision and future periods if the revision affects both current and future periods.
Key sources of estimation uncertainty The following are the key assumptions concerning the future, and other key sources of estimation uncertainty at the end of the reporting period that may have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year.
(a)
Impairment of non-financial assets In determining whether an asset is impaired or the event previously causing the impairment no longer exists, the Group has to exercise judgement in the area of asset impairment, particularly in assessing:
(b)
(i)
whether an event has occurred that may affect the asset value or such event affecting the asset value has not been in existence;
(ii)
whether the carrying value of an asset or a CGU can be supported by the recoverable amount of the CGU, which is the higher of fair value less costs of disposal and value-in- use of the CGU. The value-in-use calculation is based on the net present value of future cash flows which are estimated based upon the continued use of the asset or CGU, or derecognition; and
(iii)
the appropriate key assumptions to be applied in preparing cash flow projections including whether these cash flow projections are discounted using an appropriate rate. Changing the assumptions selected by management to determine the level of impairment, including the discount rates or the growth rate assumptions in the cash flow projections, could materially affect the net present value used in the impairment test.
Inventories The Group records the cost of gold mining ore placed on its leach pads and in process at its mine as gold in process inventory, and values gold in process inventory at the lower of cost and estimated net realisable value. The assumptions used in the valuation of gold in process inventories include estimates of gold contained in the ore placed on leach pads, and the amount of gold that is expected to be recovered from the ore placed on leach pads. If these estimates or assumptions are proven inaccurate, the Group could be required to write down the recorded value of its gold in process inventories. During the year, there is no change in the relevant estimation. Although the quantities of recoverable gold placed on the leach pad and the processing plant are reconciled by comparing the grades of ore placed on the leach pad to the quantities actually recovered, the nature of the leaching process inherently limits the ability to precisely monitor inventory levels. The actual recovery of gold from the leach pad is not known until the leaching process has concluded at the end of the mine life.
- 61 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
CRITICAL ACCOUNTING JUDGEMENT AND KEY SOURCES OF ESTIMATION UNCERTAINTY (Cont’d) Key sources of estimation uncertainty (Cont’d) (b)
Inventories (Cont’d) The Management periodically reassesses the assumptions used in the valuation of gold in process, particularly the estimated recovery rate to calculate the amount of gold that is expected to be recovered from the ore placed on leach pads (the “Estimated Recovery Rate”). As of December 31, 2025, the Group applies an Estimated Recovery Rate derived from metallurgical recovery assumptions disclosed in the NI 43-101 technical report and adjusted, where appropriate, based on current operating conditions and historical performance. An increase/decrease in the Estimated Recovery Rate by ±3 percentage points would lead to a decrease/ increase in the average production cost of gold doré bars by US$11.7 million. During the year, there is no change in the relevant estimation. The carrying amounts of gold in process and gold doré bars as at December 31, 2025 and 2024 are disclosed in note 17.
(c)
Contingency The Group is involved in a legal proceeding with an independent mine construction contractor of Huatailong and has applied judgement on whether it is probable that an outflow of economic benefits will be required by taking into account the new evidences and materials collected and the legal advice. Disclosures has been set out in note 31(iii) and no related provision has been made as of December 31, 2025.
(d)
Depreciation and amortisation of mining related assets and reserves estimates As explained in note 3, mineral assets and mining rights are depreciated and amortised using the units of production method based on the proved and probable mineral reserves. Engineering estimates of the Group’s mineral reserves are inherently imprecise and represent only approximate amounts because of the subjective judgements involved in developing such information. There is a national standard set by the PRC Government regarding the engineering criteria that have to be met before estimated mineral reserves can be designated as “proved and probable”. Proved and probable mineral reserve estimates are updated at regular basis and have taken into account recent production and technical information about each mine. In addition, as prices and cost levels change from year to year, the estimate of proved and probable gold reserves also changes. This change is considered a change in estimate for accounting purposes and is reflected on a prospective basis in related depreciation rates. Despite the inherent imprecision in these engineering estimates, these estimates are used in determining depreciation and amortisation expenses. Depreciation rates are determined based on estimated proved and probable gold reserve quantity (the denominator) and capitalised costs of mineral assets and mining rights (the numerator). The capitalised cost of mineral assets and mining rights are amortised based on the units of gold equivalent metal volume produced.
- 62 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
REVENUE AND SEGMENT INFORMATION Revenue (i)
Disaggregation of revenue from contracts with customers The following is an analysis of the Group’s revenue from its major products and service:
At a point in time Gold doré bars Copper Other by-products and service (note) Total revenue
2025 US$’000
2024 US$’000
338,473 495,555 476,098
246,946 283,224 226,476
1,310,125
756,646
Note: Other by-products mainly consist of molybdenum, silver, lead and zinc. Other services consist of transportation services, which contribute to less than 1% (2024: less than 1%) of total revenue of the Group during the year ended December 31, 2025.
(ii)
Performance obligations for contracts with customers The Group sells gold doré bars, copper and other by-products directly to customers. Revenue is recognised at a point in time when control of the gold doré bars, copper and other by-products is passed to customers, i.e. when the products are delivered and titles have passed to customers. A contract liability represents the Group’s obligation to transfer goods or services to a customer for which the Group has received consideration (or an amount of consideration is due) from the customer. All sales of gold doré bars, copper and other by-products are for periods of one year or less. As permitted under IFRS 15, the transaction price allocated to these unsatisfied contracts is not disclosed.
- 63 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
REVENUE AND SEGMENT INFORMATION (Cont’d) Segment information IFRS 8 Operating Segment requires operating segments to be identified on the basis of internal reports that are regularly reviewed by the chief operating decision-maker (“CODM”) to allocate resources to the segments and to assess their performance. The CODM, who is responsible for allocating resources and assessing performance of the operating segments, has been defined as the executive directors of the Company. The CODM has identified two operating and reportable segments as follows: (i)
The mine-produced gold segment – the production of gold doré bars through the Group’s integrated processes, i.e., mining, metallurgical processing, production and selling of gold doré bars to external clients.
(ii)
The mine-produced copper concentrate segment – the production of copper concentrate including other byproducts through the Group’s integrated processes, i.e., mining, metallurgical processing, production and selling copper concentrate including other by-products to external clients.
Information regarding the above segments is reported below.
(a)
Segment revenue and results The following is an analysis of the Group’s revenue and results by operating and reportable segment: For the year ended December 31, 2025
Mine – produced gold US$’000
Mine – produced copper concentrate US$’000
Segment total US$’000
Unallocated US$’000
Consolidated US$’000
Revenue – external and segment revenue Cost of sales
338,473 (164,876)
971,652 (461,258)
1,310,125 (626,134)
– –
1,310,125 (626,134)
Mining operating earnings
173,597
510,394
683,991
–
683,991
Income (loss) from operations Foreign exchange gain (loss), net Interest and other income Other expenses Finance costs
172,464
421,723
594,187
(4,062)
590,125
105 4,568 – (344)
(458) 4,217 (22,538) (14,428)
(353) 8,785 (22,538) (14,772)
4 2,946 – (4,032)
(349) 11,731 (22,538) (18,804)
Profit (loss) before income tax
176,793
388,516
565,309
(5,144)
560,165
- 64 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
REVENUE AND SEGMENT INFORMATION (Cont’d) Segment information (Cont’d) (a)
Segment revenue and results (Cont’d) For the year ended December 31, 2024
Mine – produced gold US$’000
Mine – produced copper concentrate US$’000
Segment total US$’000
Unallocated US$’000
Consolidated US$’000
Revenue – external and segment revenue Cost of sales
246,946 (165,574)
509,700 (404,152)
756,646 (569,726)
– –
756,646 (569,726)
Mining operating earnings
81,372
105,548
186,920
–
186,920
Income (loss) from operations Foreign exchange loss, net Interest and other income Other expenses Finance costs
80,934 (2,087) 2,615 – (404)
46,244 (296) 258 (10,132) (17,054)
127,178 (2,383) 2,873 (10,132) (17,458)
(3,984) (178) 2,236 – (4,932)
123,194 (2,561) 5,109 (10,132) (22,390)
Profit (loss) before income tax
81,058
19,020
100,078
(6,858)
93,220
The accounting policies of the operating segments are the same as the Group’s accounting policies. Segment results represent profit (loss) before income tax without allocation of certain general and administrative expenses, foreign exchange loss, other expenses, interest and other income and finance costs, attributable to the respective segment. This is the measure reported to the CODM for the purposes of resource allocation and performance assessment. There are no inter-segment sales for the years ended December 31, 2025 and 2024.
- 65 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
REVENUE AND SEGMENT INFORMATION (Cont’d) Segment information (Cont’d) (b)
Segment assets and liabilities The following is an analysis of the Group’s assets and liabilities by segment representing assets/liabilities directly attributable to the respective segment:
Mine – produced gold US$’000
Mine – produced copper concentrate US$’000
Segment total US$’000
Unallocated US$’000
Consolidated US$’000
750,910 50,237
2,451,131 887,806
3,202,041 938,043
154,494 81,466
3,356,535 1,019,509
599,908 34,886
2,266,611 1,033,576
2,866,519 1,068,462
69,460 81,311
2,935,979 1,149,773
As of December 31, 2025 Total assets Total liabilities As of December 31, 2024 Total assets Total liabilities
For the purposes of monitoring segment performance and allocating resources between segments: •
all assets are allocated to operating segments other than certain cash and cash equivalents, other receivables, prepaid expenses and deposits, right-of-use assets, property, plant and equipment and equity instruments at FVTOCI; and
•
all liabilities are allocated to operating segments other than other payables and accrued expenses, lease liabilities, deferred income and certain borrowings.
- 66 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
REVENUE AND SEGMENT INFORMATION (Cont’d) Segment information (Cont’d) (c)
Other segment information (included in the measure of segment profit or loss or segment assets regularly provided to the CODM) Mine – produced gold US$’000
Mine – produced copper concentrate US$’000
Segment total US$’000
Unallocated US$’000
Consolidated US$’000
7,276 141 –
43,453 62,807 150
50,729 62,948 150
– 206 –
50,729 63,154 150
(36,882)
(95,116)
(131,998)
–
(131,998)
(719)
(28,364)
(29,083)
–
(29,083)
(3,318)
(1,543)
(4,861)
(57)
(4,918)
6,311 –
28,027 11,217
34,338 11,217
– –
34,338 11,217
(54,408)
(66,877)
(121,285)
–
(121,285)
(788)
(19,118)
(19,906)
–
(19,906)
(3,606)
(1,071)
(4,677)
(99)
(4,776)
For the year ended December 31, 2025 Additions of property, plant and equipment Additions of right-of-use assets Additions of intangible assets Depreciation of property, plant and equipment Amortisation of intangible assets Depreciation of right-of-use assets For the year ended December 31, 2024 Additions of property, plant and equipment Additions of right-of-use assets Depreciation of property, plant and equipment Amortisation of intangible assets Depreciation of right-of-use assets
- 67 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
REVENUE AND SEGMENT INFORMATION (Cont’d) Segment information (Cont’d) (d)
Geographical information The Group operated in two geographical areas, Canada and the PRC. The Group’s corporate division located in Canada does not have any revenue and therefore is not presented as an operating segment. During the years ended December 31, 2025 and 2024, the Group’s revenue was generated from gold sales and copper multi-products to customers in the PRC. Approximately 99% (2024: 98%) of non-current assets (excluding equity instruments at FVTOCI) of the Group are located in the PRC.
(e)
Information about major customers Revenue from major customers which accounts for 10% or more of the Group’s total revenue are sales of gold doré bars and copper concentrate including other by-products to CNG and its subsidiaries as disclosed in note 30(a). No third-party customers of the corresponding years contribute over 10% or more of the total sales of the Group.
GENERAL AND ADMINISTRATIVE EXPENSES Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
Administration and office Depreciation of property, plant and equipment Depreciation of right-of-use assets Professional fees Salaries and benefits Others
9,837 7,072 54 4,948 21,344 16,679
6,918 6,867 99 6,492 18,192 8,998
Total general and administrative expenses
59,934
47,566
Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
Penalties on occupation of grasslands Provision for litigation compensation and related interest charge Impairment loss on other non-current assets (note 22) Others
– 15,878 5,879 781
8,739 1,393 – –
Total other expenses
22,538
10,132
OTHER EXPENSES
- 68 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
FINANCE COSTS Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
15,081 848
19,527 66
721 2,747
425 2,811
Less: Amounts capitalised to property, plant and equipment
19,397 (593)
22,829 (439)
Total finance costs
18,804
22,390
Interests on borrowings Interests on lease liabilities Interests on provision of the variable payment arising from the mining right Accretion on environmental rehabilitation (note 28)
Interest has been capitalised at a capitalisation rate representing the weighted average interest to general borrowings.
Capitalisation rate
Year ended December 31, 2025 %
Year ended December 31, 2024 %
1.89
2.07
INCOME TAX EXPENSE/DEFERRED TAXATION The Company was incorporated in Canada and is subject to Canadian federal and provincial tax requirements which are calculated at 27% (2024: 27%) of the estimated assessable profit for the year ended December 31, 2025. PRC Enterprise Income Tax (“EIT”) is calculated at the prevailing tax rate of 25% (2024: 25%) on the estimated taxable profit of the group entities located in the PRC for the year ended December 31, 2025 except as described below.
- 69 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) Pursuant to the Enterprise Income Tax Law (the “EIT” Law) effective on January 1, 2008, Inner Mongolia Pacific Mining Co., Ltd. (“IMP”) is a certified “High and New Technology Enterprise” which is entitled to a preferential tax rate of 15% (2024: 15%) for three years from the year ended December 31, 2024 and eligible for renewal every three years. Such certificate will be expired in December 2027. Pursuant to the Tibet Administration (2022) No. 11 Notice on Provisional Implementation Measures on Enterprise Income Tax (“Notice No.11”), effective on April 29, 2022, Huatailong, which is certified as a “High and New Technology Enterprise” is entitled to preferential tax rate of 15% (2024: 15%) for three years from the year ended December 31, 2024 and eligible for renewal every three years. Such certificate will be expired in December 2027. Additionally, as Huatailong was established in the westward development area of the PRC, it enjoys an exemption from local income tax, which is set to expire on December 31, 2025. As such, Huatailong is entitled to a reduced preferential tax rate of 9% for the years ended December 31, 2025 and 2024. In February 2026, the local policy further extended the preferential tax rate for another 2 years period and will be expired in December 2027. Pursuant to Notice No.11, Metrorkongka County Jiama Industry and Trade Co., Ltd. (“Jiama Industry and Trade”), established in the westward development area of the PRC, employs 70% or more of its employees who are Tibet Permanent Residents and enjoys the exemption on local income tax, thus Jiama Industry and Trade is entitled to a reduced preferential tax rate of 15% for the years ended December 31, 2025 and 2024. Under the EIT Law and Implementation Regulation of the EIT Law, except for the preferential treatments available to certain subsidiaries as mentioned above, other subsidiaries within the Group operating in the PRC are subject to EIT at the statutory rate of 25% during the years ended December 31, 2025 and 2024. Under relevant PRC Tax Law, withholding tax is imposed on dividends declared in respect of profits earned by the PRC subsidiaries from January 1, 2008 onwards. Except the Group has recognised deferred taxation US$23,491,000 (2024: US$3,690,000) on retained profits of the PRC subsidiary of US$234,905,000 (2024: US$36,902,000) for the year ended December 31, 2025, no deferred taxation has been provided for in the consolidated financial statements in respect of temporary differences attributable to accumulated distributable profits of the other PRC subsidiaries amounting to approximately US$1,062,565,000 at December 31, 2025 (2024: US$774,487,000) as the Group is able to control the timing of the reversal of temporary differences and it is probable the temporary differences will not reverse in the foreseeable future. Taxation for other relevant jurisdictions is calculated at the rates prevailing in each of those jurisdictions respectively.
- 70 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) Tax expense comprises:
Current tax: PRC EIT PRC withholding income tax on profit earned from PRC subsidiaries Underprovision in prior year – PRC EIT
Deferred tax: PRC EIT PRC withholding income tax on profit earned from PRC subsidiaries
Total income tax expense
- 71 -
Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
56,719
14,741
7,389 77
2,696 206
64,185
17,643
3,865
6,589
19,800
3,690
23,665
10,279
87,850
27,922
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) The income tax expense for the Group can be reconciled to the profit before income tax for the year as follows:
Profit before income tax PRC EIT tax rates Tax at the PRC EIT tax rates Tax effect of different tax rates of subsidiaries operating in other jurisdictions Tax effect of concessionary tax rate Tax effect of tax losses and other deductible temporary differences not recognised, net Tax effect of non-deductible expenses Tax effect of non-taxable income Impacts on foreign exchange Withholding tax in respect of profit earned from PRC subsidiaries Underprovision of PRC EIT in prior year
- 72 -
Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
560,165
93,220
25%
25%
140,042
23,305
(2,574) (79,790)
(4,841) (13,502)
1,754 1,170 (28) 10 27,189 77
12,669 3,837 (447) 309 6,386 206
87,850
27,922
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) The following are the major deferred tax (assets) liabilities recognised and movements thereon during the current and prior years:
Others US$’000
Distributable profits of subsidiaries US$’000
Total US$’000
8,081 2,219
(3,160) 6,109
– 3,690
101,721 10,279
105,056 (3,916)
10,300 2,869
2,949 4,574
3,690 19,800
112,000 23,665
101,140
13,169
7,523
23,490
135,665
Environmental rehabilitation US$’000
Mining rights (1) US$’000
Inventories US$’000
At January 1, 2024 Charge (credit) to profit or loss
(10,900) 905
107,700 (2,644)
At December 31, 2024 Charge (credit) to profit or loss
(9,995) 338
At December 31, 2025
(9,657)
(1)
Amount represents deferred tax liability arising from the fair value adjustment on mining rights during the business acquisition of Skyland Mining Limited and its subsidiaries (“Skyland”) in December 2010.
For the purpose of presentation in the consolidated statement of financial position, certain deferred tax assets and liabilities have been offset. The following is the analysis of the deferred tax balances for financial reporting purposes:
Deferred tax assets Deferred tax liabilities
- 73 -
2025 US$’000
2024 US$’000
– (135,665)
– (112,000)
(135,665)
(112,000)
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) The Group’s unrecognised deferred income tax assets are as follows: 2025 US$’000
2024 US$’000
Deferred income tax assets Tax losses carry forwards Other deductible temporary differences
30,986 1,656
30,493 1,657
Total unrecognised deferred income tax assets
32,642
32,150
Due to the unpredictability of future profit streams, deferred tax asset of US$30,986,000 (2024: US$30,493,000) has not been recognised in respect of unused tax losses of US$147 million (2024: US$145 million) which are mainly generated from the Company. Under Canadian tax laws, unused tax losses can be carried forward for 20 years if the loss arises in tax years ended after December 31, 2005. Included in unrecognised tax losses are losses of US$82 million that will expire from 2027 to 2045 (2024: US$81 million that will expire from 2027 to 2044). Other losses may be carried forward indefinitely. Other deductible temporary differences of US$2 million (2024: US$2 million) are primarily comprised of share issue costs and cumulative eligible capital expenditures that were incurred by the Company which are tax deductible according to the relevant tax law in Canada. No deferred tax asset has been recognised because the amount of future taxable profit that will be available to realise such assets is unpredictable and not probable. The Group is within the scope of the Pillar Two model rules. The Group will account for the Pillar Two income taxes as current tax when incurred. Pillar Two legislation has been enacted or substantively enacted but not yet in effect as at 31 December 2025 in certain jurisdictions, such as the PRC, in which the Group operates. Potential exposure is assessed based on the information available regarding the financial performance of the Group in the current year. As such, it may not be entirely representative of future circumstances. Based on the assessment, the Group’s effective tax rates in jurisdictions in which it operates are above 15% and the directors of the Company are not currently aware of any circumstances under which they might change. Therefore, the Group does not expect potential exposure to Pillar Two “top-up” taxes. The Group continues to follow Pillar Two legislative developments to evaluate the potential future impact on its financial statements.
- 74 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- PROFIT FOR THE YEAR Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
600
767
Depreciation included in cost of sales and inventories Depreciation included in research and development expenses Depreciation included in general and administrative expenses (note 6)
124,924 2 7,072
114,400 18 6,867
Total depreciation of property, plant and equipment
131,998
121,285
Depreciation included in cost of sales and inventories Depreciation included in general and administrative expenses (note 6)
4,864 54
4,677 99
Total depreciation of right-of-use assets
4,918
4,776
Amortisation of mining rights (included in cost of sales)
29,083
19,906
Loss on disposal of property, plant and equipment
2,369
620
Staff costs Directors’ and chief executive’s emoluments (note 11) Staff salaries and benefits Retirement benefits contributions
310 19,610 1,424
493 16,526 1,173
Total salaries and benefits included in administrative expenses (note 6) Total salaries and benefits included in cost of sales and inventories Total salaries and benefits included in research and development expenses
21,344 63,470
18,192 56,443
2,882
2,340
Total staff costs
87,696
76,975
Bank interest income
(8,705)
(3,114)
Dividend income from equity instrument at FVTOCI
(3,026)
(2,095)
Government grants
(871)
(363)
Allowance for credit losses of trade and other receivables, net Provision for impairment of other non-current assets (note 22)
1,434 5,879
2,051 –
–
291
Profit for the year has been arrived at after charging (crediting): Auditor’s remuneration
Write-down of inventories
- 75 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (a)
Directors’ and chief executive’s emoluments Directors’ and chief executive’s remuneration for the year, disclosed pursuant to the applicable Listing Rules and CO, is as follows: For the year ended December 31, 2025
Fees US$’000
Salaries and other benefits US$’000
Retirement benefits contributions US$’000
Total US$’000
Executive Directors and Chief Executives (Note a) Chenguang Hou
–
–
–
–
Executive Directors (Note b) Na Tian Yuanhui Fu
– –
– 106
– 10
– 116
Non-executive Director (Note c) Wanming Wang
–
–
–
–
Independent Non-executive Directors (Note d) Yingbin Ian He Wei Shao Bielin Shi Ruixia (Rane) Han
53 45 46 46
– – – –
3 1 – –
56 46 46 46
190
106
14
310
- 76 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (Cont’d) (a)
Directors’ and chief executive’s emoluments (Cont’d) For the year ended December 31, 2024
Fees US$’000
Salaries and other benefits US$’000
Retirement benefits contributions US$’000
Total US$’000
Executive Directors and Chief Executives (Note a) Junhu Tong Chenguang Hou
– –
26 –
3 –
29 –
Executive Directors (Note b) Weibin Zhang Na Tian Yuanhui Fu
– – –
148 – 100
9 – 9
157 – 109
Non-executive Director (Note c) Wanming Wang
–
–
–
–
Independent Non-executive Directors (Note d) Yingbin Ian He Wei Shao Bielin Shi Ruixia (Rane) Han
54 46 46 46
– – – –
3 3 – –
57 49 46 46
192
274
27
493
- 77 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (Cont’d) (a)
Directors’ and chief executive’s emoluments (Cont’d) Notes: (a)
Mr. Chenguang Hou was appointed as executive directors and Chief Executive Officer (“CEO”) effective from November 14, 2024. He is employed by CNG and his emolument payments are centralised and made by CNG for the years ended December 31, 2024 and 2025. Mr. Junhu Tong resigned as executive director and CEO effective from August 2, 2024. Mr. Junhu Tong was also employed by CNG and partial of his emolument payments were centralised and made by CNG for the year ended December 31, 2024.
(b)
The executive directors’ emoluments shown above were for their services in connection with the management of the affairs of the Company and the Group. Ms. Na Tian is employed by CNG and her emolument payments are centralised and made by CNG for the years ended December 31, 2024 and 2025. Mr. Weibin Zhang retired as an executive director of the Company with effect from the conclusion of the annual general meeting held on June 26, 2025 (or June 27, 2025 Hong Kong time).
(c)
The non-executive director’s emoluments shown above were mainly for his services as director of the Company.
(d)
The independent non-executive directors’ emoluments shown above were mainly for their services as directors of the Company.
For the years ended December 31, 2025 and 2024, none of the directors of the Company waived or agreed to waive any emoluments.
(b) Five highest paid employees The five highest paid employees included one director (2024: two directors) for the year ended December 31, 2025. The emoluments of the four (2024: three) non-director employees for the year ended December 31, 2025, are as follows:
Employees Salaries and other benefits Retirement benefits contributions
- 78 -
Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
463 19
385 15
482
400
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (Cont’d) (b) Five highest paid employees (Cont’d) The number of the highest paid employees who are not the directors of the Company whose remuneration fell within the following band is as follows: No. of individuals
Nil to HK$1,000,000 (equivalent to approximately US$129,000) HK$1,000,001 to HK$1,500,000 (equivalent to approximately US$129,001 to US$193,000)
2025
2024
2
1
2
2
During the years ended December 31, 2025 and 2024, no emoluments were paid by the Group to the directors of the Company or the five highest paid individuals as an inducement to join or upon joining the Group or as compensation for loss of office.
-
DIVIDEND During the year ended December 31, 2024, a dividend in respect of the year ended December 31, 2024 of US$0.08 per common share (the basic dividend of US$0.05, and the special dividend of US$0.03), in an aggregate amount of US$31,713,000 was declared and paid to the shareholders of the Company upon the approval of the board resolution dated March 26, 2025. Subsequent to the end of the reporting period, a dividend in respect of the year ended December 31, 2025 of US$0.47 per common share, in an aggregate amount of US$186,785,121, has been declared by the directors of the Company upon the approval of the board resolution dated March 30, 2026.
-
EARNINGS PER SHARE Profit used in determining earnings per share are presented below:
Profit attributable to owners of the Company for the purposes of basic earnings per share (US$’000) Weighted average number of common shares, basic Basic earnings per share (US cents)
Year ended December 31, 2025
Year ended December 31, 2024
466,959
62,732
396,413,753
396,413,753
117.80
15.82
The Group had no outstanding potential dilutive instruments issued as at December 31, 2025 and 2024 and during the years ended December 31, 2025 and 2024. Therefore, diluted earnings per share is the same as the basic earnings per share.
- 79 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- CASH AND CASH EQUIVALENTS/RESTRICTED BALANCES/TERM DEPOSITS Cash and cash equivalents of the Group are comprised of cash on hand and bank balances. The Group’s cash and cash equivalents, restricted balances and term deposits denominated in the foreign currencies other than the respective group entities’ functional currencies are presented below:
Denominated in: Canadian dollars Renminbi (“RMB”) US$ Hong Kong dollars
December 31, 2025 US$’000
December 31, 2024 US$’000
179 346,538 – 4,801
129 170,392 3 4,227
351,518
174,751
The bank balances carry interest rates ranging from 0.05% to 1.485% (2024: 0.001% to 2.95%) per annum. Restricted balances carry interest at market rates ranging from 0.05% to 0.10% (2024: 0.35% to 1.15%) per annum. Included in the restricted balance as at December 31, 2025 and 2024, are cash held in designated bank accounts restricted for mine reclamation and environmental rehabilitation purposes as required by government regulations, certain amounts represents deposits that have been frozen by the Intermediate People’s Court of Lhasa City, Tibet (“Tibet Intermediate Court”) in relation to the litigations involved by Huatailong. Details of litigations are set out in note 31(i). As at December 31, 2025, term deposits carry interest at fixed market rates ranging from 1.15% to 1.7% (2024: 1.5% to 2.0%) per annum. The Group’s term deposits represent deposits held in a CNG subsidiary denominated in RMB with original maturities over three months and redeemable on maturity. The Group maintains deposits with China National Gold Group Finance Company Limited (“China Gold Finance”), a subsidiary of CNG, which is a related party. China Gold Finance holds a financial institution licence and provides financial services exclusively to subsidiaries and associates of CNG. These deposits are unsecured, interest-bearing at rates that are considered to be comparable to prevailing market rates, and are cashable on demand or repayable at their stated maturity. Further details are disclosed in Note 30 (a) to the consolidated financial statements.
- 80 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- TRADE AND OTHER RECEIVABLES
Trade receivables Less: allowance for credit losses
Amounts due from related companies (note 30(a)) Other receivables(2)
(1)
Total trade and other receivables
December 31, 2025 US$’000
December 31, 2024 US$’000
2,111 (344)
2,473 (180)
1,767 2,762 3,717
2,293 1,583 3,517
8,246
7,393
At January 1, 2024, trade receivables from contracts with customers amounted to US$1,466,000. (1)
The amounts are unsecured, interest free and repayable on demand.
(2)
Included in the balance as at December 31, 2025 and 2024 are Tax and Other Surcharges (as defined in note 22) with carrying amount of nil (2024: US$1,270,000), net of allowance for credit losses, to be recovered from Zhongxinfang Tibet Construction Investment Co. Ltd. (“Zhongxinfang”), an independent third party property developer. As detailed disclosed in Note 31(i)(c).
Based on the best available information to the Group and the credit risk assessment of Zhongxinfang as of December 31, 2025, expected credit loss of RMB9,131,000 (equivalent to US$1,270,000) (2024: RMB13,697,000 (equivalent to US$1,923,000) for the Tax and Other Surcharge from Zhongxinfang are recognised, and the accumulated allowance for credit losses is RMB45,655,000 (equivalent to US$6,351,000) as of December 31, 2025 (2024: RMB36,524,000 (equivalent to US$5,081,000)). The Group allows an average credit period of 30 days and 180 days to its trade customers. Below is an aged analysis of trade receivables (net of allowance for credit losses) presented based on invoice dates, which approximated the respective revenue recognition dates, at the end of the reporting period:
Less than 30 days 31 to 90 days 91 to 180 days Over 180 days Total trade receivables
December 31, 2025 US$’000
December 31, 2024 US$’000
714 241 3 809
819 130 276 1,068
1,767
2,293
In determining the recoverability of a trade receivable, the Group considers any change in the credit quality of the trade receivable from the date credit was initially granted up to the reporting date.
- 81 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- PREPAID EXPENSES AND DEPOSITS
Deposit for acquisition of land use right (Note a) Deposit for water treatment project Deposit paid for acquisition of property, plant and equipment (Note b) Other prepayment and deposits
Less: A mounts that will be settled or utilised within one year shown under current assets Amounts that will be settled or utilised for more than one year shown under non-current assets
December 31, 2025 US$’000
December 31, 2024 US$’000
– – 74 1,794
23,906 6,017 172 1,513
1,868
31,608
(1,794)
(1,513)
74
30,095
Notes: a.
The amounts comprised cost of land use right, grassland compensation fee paid to government authorities and relocation compensation fees paid to pastoralists, which are related to the acquisition of a land use right for the Phase III tailings dam construction project in Jiama Mine. During the year, the acquisition of land used rights was completed the relevant deposits paid was transferred to right of use assets.
b.
The amount represents deposits paid to third party contractors for the acquisition of property, plant and equipment to expand the Group’s mining capacity in Tibet, the PRC. The amount is shown as non-current asset.
- 82 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- INVENTORIES December 31, 2025 US$’000
December 31, 2024 US$’000
Gold in process Gold doré bars Consumables Copper concentrate Spare parts
249,498 8,283 9,713 5,017 22,025
222,568 26,467 11,119 5,959 24,292
Total inventories
294,536
290,405
Inventories totalling US$620,578,000 (2024: US$464,027,000) for the year ended December 31, 2025 was recognised in cost of sales.
- RIGHT-OF-USE ASSETS Leasehold lands US$’000
Leased equipment US$’000
Leased properties US$’000
Total US$’000
At December 31, 2025 Carrying amount
103,949
391
179
104,519
At December 31, 2024 Carrying amount
45,031
899
27
45,957
For the year ended December 31, 2025 Depreciation charge
4,441
420
57
4,918
For the year ended December 31, 2024 Depreciation charge
4,208
469
99
4,776
- 83 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- RIGHT-OF-USE ASSETS (Cont’d) Year ended December 31, 2025 US$’000
Year ended December 31, 2024 US$’000
Total cash outflow for leases (Note)
21,161
35,722
Additions to right-of-use assets
63,154
11,217
For both years, the Group leases leasehold lands, equipment and office premises for its operations. The lease terms of leasehold lands are 2 years to in perpetuity (2024: 2 years to in perpetuity). Lease contracts of office premises and equipment are entered into for a fixed term of 5 years (2024: 5 years). Lease terms are negotiated on an individual basis and contain a wide range of different terms and conditions. In determining the lease term and assessing the length of the non-cancellable period, the Group applies the definition of a contract and determines the period for which the contract is enforceable. The Group obtained several land use right certificates for leasehold lands where its mining facilities are primarily located. Lump sum payments were made upfront to acquire these leasehold lands. The leasehold lands are presented separately. Note: The amount that the Group paid to government authorities and pastoralists of during the year ended 31 December 2024 of US$23,906,000 as a deposit for acquisition of land use right is included in the total cash outflow for leases for the year ended 31 December 2024.
The Group depreciated the leasehold lands using the straight-line method over the estimated useful lives of the leasehold land.
Restrictions or covenants on leases In addition, lease liabilities of US$12,584,000 (2024: US$928,000) are recognised with related right-of-use assets of US$13,458,000 (2024: US$926,000) as at December 31, 2025. The lease agreements do not impose any covenants other than the security interests in the leased assets that are held by the lessor. Leased assets may not be used as security for borrowing purposes.
- 84 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- EQUITY INSTRUMENTS AT FVTOCI
Listed investments: Equity securities listed in Hong Kong (Note a) Unlisted investments: Equity securities (Note b) Total
December 31, 2025 US$’000
December 31, 2024 US$’000
133,678
47,599
197
812
133,875
48,411
Note: a.
The above investments represent 2.03% equity interest in ordinary shares of China Nonferrous Mining Corporation Limited (“CNMC”), an entity listed in Hong Kong and is principally engaged in mining, processing and trading of nonferrous metals in Zambia. These investments are not held for trading, instead, they are held for long-term strategic purposes. The directors of the Company have elected to designate these investments in equity instruments as at FVTOCI as they believe that recognising short-term fluctuations in these investments’ fair value in profit or loss would not be consistent with the Group’s strategy of holding these investments for long-term purposes and realising their performance potential in the long run. During the year ended December 31, 2025, a fair value gain of US$86,079,000 (2024: US$1,271,000) was recognised in other comprehensive income and accumulated under the heading of investments revaluation reserve in accordance with the Group’s accounting policies.
b.
The above unlisted equity investments represent 7.425% (2024: 7.425%) share interest in Tibet Zhongjin Xinlian Demolition Engineering Co. Ltd. (“Tibet Zhongjin Xinlian”) and 4% share interest in Tibet Electric Power Trading Center Co., Ltd. (“Tibet Electric”). Tibet Zhongjin Xinlian is established in the PRC and principally engaged in the development and manufacturing of explosives. Tibet Electric is established in the PRC and is principally engaged in the trading of electric power in the PRC. The directors of the Company have elected to designate these investments in equity instruments as at FVTOCI as they believe that recognising short-term fluctuations in these investments’ fair value in profit or loss would not be consistent with the Group’s strategy of holding these investments for long-term purposes and realising their performance potential in the long run. During the year, a fair value loss of unlisted investments of USD615,000 (2024: Nil) was recognised in other comprehensive income and accumulated under the heading of investments revaluation reserve in accordance with the Group’s accounting policies. As at December 31, 2025, the fair value of the unlisted equity investments are RMB1,385,000 (approximately US$197,000) (2024: RMB5,838,000 (approximately US$812,000)),
- 85 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- PROPERTY, PLANT AND EQUIPMENT
Buildings US$’000
Crushers US$’000
Furniture and office equipment US$’000
516,370 1,502 115,345
227,332 – –
15,582 2,677 –
311,738 5,010 –
11,728 8 –
98 – –
1,419,318 14,048 31
125,711 11,093 (115,376)
2,627,877 34,338 –
– (997) (8,257)
– – –
– (37) (195)
– (2,336) (3,787)
– – (123)
– – –
(9) – (12,787)
– – (878)
(9) (3,370) (26,027)
At December 31, 2024 Additions Transfer from CIP Environmental rehabilitation adjustment (note 28) Disposals Exchange realignment
623,963 1,791 10,169
227,332 – –
18,027 3,785 113
310,625 5,608 –
11,613 1,790 –
98 – –
1,420,601 8,696 –
20,550 29,059 (10,282)
2,632,809 50,729 –
– – 13,727
– – –
– (142) 365
– (21) 5,868
– (550) 208
– – –
20,249 (2,098) 18,670
– – 701
20,249 (2,811) 39,539
At December 31, 2025
649,650
227,332
22,148
322,080
13,061
98
1,466,118
40,028
2,740,515
ACCUMULATED DEPRECIATION At January 1, 2024 Provided for the year Eliminated on disposals Exchange realignment
(173,213) (30,023) 545 2,509
(187,449) (14,054) – –
(9,562) (1,653) 3 113
(186,509) (18,044) 2,202 2,170
(7,688) (862) – 81
(98) – – –
(581,457) (56,649) – 2,327
– – – –
(1,145,976) (121,285) 2,750 7,200
At December 31, 2024 Provided for the year Eliminated on disposals Exchange realignment
(200,182) (44,404) – (4,775)
(201,503) (658) – –
(11,099) (3,626) 16 (237)
(200,181) (16,959) 9 (3,676)
(8,469) (1,930) 405 (156)
(98) – – –
(635,779) (64,421) – (3,345)
– – – –
(1,257,311) (131,998) 430 (12,189)
At December 31, 2025
(249,361)
(202,161)
(14,946)
(220,807)
(10,150)
(98)
(703,545)
–
(1,401,068
CARRYING VALUE At December 31, 2025
400,289
25,171
7,202
101,273
2,911
–
762,573
40,028
1,339,447
At December 31, 2024
423,781
25,829
6,928
110,444
3,144
–
784,822
20,550
1,375,498
COST At January 1, 2024 Additions Transfer from CIP Environmental rehabilitation adjustment (note 28) Disposals Exchange realignment
Machinery and equipment US$’000
Motor Leasehold vehicles improvements US$’000 US$’000
Mineral assets US$’000
Construction in progress (“CIP”) US$’000
Total US$’000
- 86 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- PROPERTY, PLANT AND EQUIPMENT (Cont’d) Except for mineral assets and construction in progress, the above items of property, plant and equipment, taking into account the residual value, are depreciated using the straight-line method over the estimated useful lives of the related assets as follows: Buildings Crushers Furniture and office equipment Machinery and equipment Motor vehicles Leasehold improvements
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock Code: 2099)
(Toronto Stock Code: CGG)
RESULTS ANNOUNCEMENT
FOR THE YEAR ENDED DECEMBER 31, 2025
FINANCIAL HIGHLIGHTS
For the Year ended December 31,
20252024
US$’000US$’000
Revenues1,310,125756,646
Net profit472,31565,298
Basic earnings per share (cents)117.8015.82
Diluted earnings(loss) per share (cents)N/AN/A
Net cash flows from operations709,984306,896
Property, plant and equipment1,339,4471,375,498
Property, plant and equipment capital expenditures50,13648,286
Cash and cash equivalents399,402183,779
Working capital580,005326,988
RESULTS
The board of directors (the“Board”) of China Gold International Resources Corp. Ltd. (the “Company”
together with its subsidiaries, referred hereto as the “Group”) is pleased to announce the audited
consolidated results of the Group for the year ended December 31, 2025 with comparative figures for
the comparable period in 2024, as follows:
- 1 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 2 -
The following Management Discussion and Analysis of financial condition and results of operations (“MD&A”) is prepared
as of March 30, 2026. It should be read in conjunction with the consolidated financial statements and notes thereto of
China Gold International Resources Corp. Ltd. (referred to herein as “China Gold International”, the “Company”, “we”
or “our” as the context may require) for the three months and year ended December 31, 2025 and the three months
and year ended December 31, 2024, respectively. Unless the context otherwise provides, references in this MD&A to
China Gold International or the Company refer to China Gold International and each of its subsidiaries collectively on a
consolidated basis. The following discussion contains certain forward-looking statements relating to the Company’s plans, objectives, expectations and intentions, which are based on the Company’s current expectations and are subject to risks, uncertainties and changes in circumstances. Readers should carefully consider all of the information set out in this MD&A, including the risks and uncertainties outlined further in the Company’s Annual Information Form (“Annual Information Form” or “AIF”) dated
March 30, 2026 on SEDAR+ at www.sedarplus.ca, www.chinagoldintl.com and www.hkex.com.hk. For further information on risks and other factors that could affect the accuracy of forward-looking statements and the result of operations of the Company, please refer to the sections titled “Forward-Looking Statements” and “Risk Factors” and to discussions elsewhere within this MD&A. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 3 -
FORWARD-LOOKING STATEMENTS
Certain statements made herein, other than statements of historical fact relating to the Company, represent forward-looking
information. In some cases, this forward-looking information can be identified by words or phrases such as “may”, “will”,
“expect”, “anticipate”, “contemplates”, “aim”, “estimate”, “intend”, “plan”, “believe”, “potential”, “continue”, “is/are likely
to”, “should” or the negative of these terms, or other similar expressions intended to identify forward-looking information.
This forward-looking information includes, among other things; China Gold International’s production estimates, business
strategies and capital expenditure plans; the development and expansion plans and schedules for the CSH Mine and
the Jiama Mine; China Gold International’s financial condition; the regulatory environment as well as the general industry outlook; general economic trends in China; and statements respecting anticipated business activities, planned expenditures, corporate strategies, participation in projects and financing, and other statements that are not historical facts. By their nature, forward-looking information involves numerous assumptions, both general and specific, which may cause the actual results, performance or achievements of China Gold International and/or its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward–looking information. Some of the key assumptions include, among others, the absence of any material change in China Gold International’s operations or in foreign exchange rates, the prevailing price of gold, copper and other non-ferrous metal products; the absence of lower- than-anticipated mineral recovery or other production problems; effective income and other tax rates and other assumptions underlying China Gold International’s financial performance as stated in the Company’s technical reports for its CSH Mine and Jiama Mine; China Gold International’s ability to obtain regulatory confirmations and approvals on a timely basis;
continuing positive labor relations; the absence of any material adverse effects as a result of political instability, terrorism, natural disasters, pandemics such as COVID-19, litigation or arbitration and adverse changes in government regulation;
the availability and accessibility of financing to China Gold International; and the performance by counterparties of the
terms and conditions of all contracts to which China Gold International and its subsidiaries are a party. The forward-looking information is also based on the assumption that none of the risk factors identified in this MD&A or in the AIF that could cause actual results to differ materially from the forward-looking information actually occurs. Forward-looking information contained herein as of the date of this MD&A is based on the opinions, estimates and
assumptions of management. There are a number of important risks, uncertainties and other factors that could cause
actual actions, events or results to differ materially from those described as forward-looking information. China Gold
International disclaims any obligation to update any forward-looking information, whether as a result of new information, estimates, opinions or assumptions, future events or results, or otherwise except to the extent required by law. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking information in this MD&A is expressly qualified by this cautionary statement. The reader is cautioned not to place undue reliance on forward-looking information.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 4 -
THE COMPANY
Overview
China Gold International is a gold and base metal mining company registered in British Columbia, Canada. The Company’s
main business involves the operation, acquisition, development and exploration of gold and base metal properties.
The Company’s principal mining operations are the Chang Shan Hao Gold Mine (“CSH Mine” or “CSH”), located in Inner
Mongolia, China and the Jiama Copper-Gold Polymetallic Mine (“Jiama Mine” or “Jiama”), located in Tibet, China. China
Gold International holds a 96.5% interest in the CSH Mine, while its Chinese joint venture (“CJV”) partner holds the
remaining 3.5% interest. The Company owns a 100% interest in the Jiama Mine, which hosts a large scale copper-gold polymetallic deposit containing copper, gold, molybdenum, silver, lead and zinc metals. China Gold International’s common shares are listed on the Toronto Stock Exchange (“TSX”) and The Stock Exchange of Hong Kong Limited (“HKSE”) under the symbol CGG and the stock code 2099, respectively. Additional information about the Company, including the Company’s Annual Information Form, is available on SEDAR+ at sedarplus.ca as well as Hong Kong Exchange News at hkexnews.hk.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 5 - Performance Highlights Three months ended December 31, 2025 • Revenue increased by 31% to US$384.7 million from US$293.6 million for the same period in 2024. • Mine operating earnings of US$209.9 million, increased by US$87.7 million from mine operating earnings of US$122.2 million for the same period in 2024. • Net profit of US$127.7 million increased by US$59.4 million from US$68.3 million for the same period in 2024. • Cash flow from operation of US$140.4 million, increased from US$62.7 million for the same period in 2024. • Total gold production decreased by 21% to 47,875 ounces from 60,406 ounces for the same period in 2024. • Total copper production was 37.0 million pounds (approximately 16,756 tonnes) a decrease from 44.1 million pounds (approximately 20,020 tonnes) for the same period in 2024.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 6 - Year ended December 31, 2025 • Revenue increased by 73% to US$1,310.1 million from US$756.6 million for the same period in 2024. • Mine operating earnings of US$684.0 million, increased by US$497.1 million from US$186.9 million for the same period in 2024. • Net profit of US$472.3 million increased by US$407.0 million from US$65.3 million for the same period in 2024. • Cash flow from operation of US$710.0 million, increased from US$306.9 million for the same period in 2024. • Total gold production increased by 9% to 177,225 ounces from 162,652 ounces for the same period in 2024. • Total copper production was 156.3 million pounds (approximately 70,883 tonnes) a 48% increase from 105.7 million pounds (approximately 47,929 tonnes) for the same period in 2024. Selected Annual Information* Year ended December 31 20252024202320222021
US$ Millions except for per share Total revenue1,3107574591,1051,137 Income from operations59012332317333 Net profit (loss)47265(23)225269 Basic earnings (loss) per share (cents)117.8015.82(6.43)56.1967.44 Diluted earnings (loss) per share (cents)N/AN/AN/AN/AN/A Total assets3,3572,9362,8353,1953,257 Total non-current liabilities5558098026531,080
- Prepared under IFRS
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 7 -
OUTLOOK
After the repairs and reinforcements of the overflow of the Guolanggou Tailings Dam, the Government of Tibet Autonomous
Region and relevant departments of the central government approved the resumption of Jiama’s operations on May 30,
2024, with a daily processing capacity of 34,000 tonnes, which is lower than the design processing capacity. The Company is actively advancing the construction of the Phase III tailings pond, which is expected to be completed and put into
operation in the first half of 2027. The total daily processing capacity is anticipated to increase to 44,000 tpd once the
Phase III tailings pond is in operation. The open-pit operations at the CSH gold mine are nearing the end of its mine life. With the CSH pit’s increased depth, the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. Ensuring slope stability and avoiding systematic risks at this stage are the Company’s top priority to ensure safe and sustainable production. Inconsideration of the events, the Company reports separate production guidance for the two mines in 2026. CSH Mine: • The total gold production is estimated between 70,732 ounces (2.2 tonnes) and 83,592 ounces (2.6 tonnes). Jiama Mine: • The copper production will be approximately between 140 million pounds (63,500 tonnes) and 149 million pounds (67,500 tonnes); • The gold production will be approximately between 70,732 ounces (2.2 tonnes) and 75,554 ounces (2.35 tonnes); • The silver production will be approximately between 4.18 million ounces (130 tonnes) and 4.82 million ounces (150 tonnes);.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 8 -
Outline of the Long-Term Development Plan for the Jiama Mine
In 2024, the Company successfully restored stable operation at the Jiama Mine. In addition, the Company continued to
focus its efforts on optimizing resource utilization plan, integrating the identified high-grade underground resources, and
accelerating the exploration work at high potential zones. The long-term development plan for the Jiama Mine consists
of three phases: • Prior to the completion of the construction of the new tailings storage facility (the “Youlongbu tailings storage facility”), the Jiama Mine Phase II processing plant will maintain and operate at its current processing capacity of 34,000 tons per day to match the Guolanggou’s storage capacity (the operation of Phase I processing plant has been suspended since May 2024). • The Youlongbu tailings storage facility is scheduled to commence operation in 2027, allowing a further increase in the Jiama Mine’s production capacity. Over the next two years, as part of the underground resource integration plan, the Company plans to apply to increase the permitted capacity on its mining license for the Jiama Mine, subject
to compliance with the relevant safety requirements. Currently, the permitted capacity on the mining license of the Jiama Mine is 14.4 million tonnes per year (approximately 44,000 tonnes per day based on 330 operating days per year). Subject to the government approval of an increased annual mining rate, and following the commissioning of Youlongbu tailings storage facility, the Jiama Mine’s ore processing volume will return to the level of 50,000 tonnes per day, in line with the designed processing capacity of the processing plants. In addition, endeavors are underway so that the production levels at the Jiama Mine will restore to those before the Guolanggou tailings overflow through blending of high-grade underground ores. • The Company is also working to delineate new resources at satellite deposits near the Jiama Mine. The Company has been actively conducting geological exploration work in two areas: the Bayi Ranch and the Zegulang North, both of which have shown significant resource potential. The Company will provide an update on the exploration progress
and results in due course. Subject to the final exploration outcomes and feasibility studies on resource development, the Company will formulate a comprehensive expansion plan for the Jiama Mine area. This study has already been initiated at a preliminary stage.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 9 - RESULTS OF OPERATIONS Selected Quarterly Financial Data Quarter ended 20252024 (US$ in thousands except per share)31-Dec30-Sep30-Jun31-Mar31-Dec30-Sep30-Jun31-Mar
Revenue384,734345,026307,269273,096293,567254,581147,95560,543 Cost of sales174,826147,993147,872155,444171,413207,762118,51272,039 Mine operating earnings (loss)209,908197,033159,397117,653122,15446,81929,443(11,496) General and administrative expenses21,45014,18412,06812,23217,8779,94410,6499,096 Exploration and evaluation expenditures268224133508247495092 Research and development expenses16,3997,8485,2563,2968,1184,7042,113787 Income (loss) from operations171,791174,777141,940101,61795,91232,12216,631(21,471) Foreign exchange gain (loss)7,381(3,039)(2,037)(2,654)(4,631)2,670(443)(157) Finance costs4,5114,7114,5805,0025,3135,6925,7225,663 Profit (loss) before income tax171,694153,450139,25295,77085,54030,1663,924(26,410) Income tax expense (credit)43.99411,15622,9099,79117,2232,2938,768(362) Net profit (loss)127,699142,294116,34385,97968,31727,873(4,844)(26,048) Basic earnings (loss) per share (cents)31.6735.6029.0821.4516.976.84(1.36)(6.63) Diluted earnings per share (cents)N/AN/AN/AN/AN/AN/AN/AN/A
Selected Quarterly and Annual Production Data and Analysis CSH MineThree months ended December 31,Year ended December 31, 2025202420252024
Gold sales (US$ million)98.2178.80338.47246.95 Realized average price (US$) of gold per ounce4,1242,6593,4192,453 Gold produced (ounces)28,68436,71996,816108,188 Gold sold (ounces)23,81429,64199,010100,682 Total production cost (US$ per ounce)1,7471,7211,6651,645 Cash production cost (1) (US$ per ounce)1,5211,3061,2631,064
(1) Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A
Gold production at the CSH Mine decreased by 22% to 28,684 ounces for the three months ended December 31, 2025
compared to 36,719 ounces for the same period in 2024. The total production cost of gold for the three months ended
December 31, 2025 increased to US$1,747 per ounce compared to US$1,721 for the same period in 2024. The cash
production cost of gold for the three months ended December 31, 2025 increased to US$1,521 per ounce from US$1,306
for the same period in 2024. The increase in Cash production cost is mainly due to the increase in environment protection
fees.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 10 - Jiama MineThree months ended December 31,Year ended December 31, 2025202420252024
Copper sales (US$ in millions)148.99106.16495.56283.22 Realized average price 1 (US$) of copper per pound after smelting fee discount3.802.423.172.71 Copper produced (tonnes)16,75620,02070,88347,929 Copper produced (pounds)36,939,25744,135,873156,269,659105,664,184 Copper sold (tonnes)17,65219,93170,95947,421 Copper sold (pounds)38,917,01043,940,061156,437,873104,545,457 Gold produced (ounces)19,19123,68880,40954,464 Gold sold (ounces)20,19523,52080,40653,963 Silver produced (ounces)1,275,1431,479,7085,645,9153,231,408 Silver sold (ounces)1,346,9561,473,0275,648,6313,193,073 Lead produced (tonnes)7,97313,50340,91227,896 Lead produced (pounds)17,577,96829,768,12890,196,25761,500,340 Lead sold (tonnes)8,45113,36041,03627,493 Lead sold (pounds)18,632,14329,453,69790,468,42360,612,685 Zinc produced (tonnes)5,2486,57523,44614,663 Zinc produced (pounds)11,569,32114,495,12151,688,42932,326,595 Zinc sold (tonnes)5,5366,47923,55614,442 Zinc sold (pounds)12,205,51314,282,87851,932,90431,839,913 Moly produced (tonnes)138120768354 Moly produced (pounds)303,944264,7531,692,167780,704 Moly sold (tonnes)134234840234 Moly sold (pounds)295,027515,2171,851,486515,217 Total production cost 2 (US$) of copper per pound4.363.313.524.44 Total production cost 2 (US$) of copper per pound after by-products credits 4 0.880.890.522.32 Cash production cost 4 (US$) per pound of copper3.632.652.743.62 Cash production cost 3 (US$) of copper per pound after by-products credits 4 0.140.23(0.26)1.50
1 A discount factor of 11.9% to 25.3% is applied to the copper benchmark price to compensate the refinery costs incurred by the buyers. The
discount factor is higher if the grade of copper in copper concentrate is below 18%. The industry standard of copper in copper concentrate
is between 18-20%.
2 Production costs include expenditures incurred at the mine sites for the activities related to production including mining, processing, mine
site G&A and royalties etc.
3 Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A
4 By-products credit refers to the sales of gold, silver, lead, zinc and moly during the corresponding period.
5 Increased production of by-products combined with reduced G&A and R&D costs, has resulted in by-product credits exceeding total
production cost of copper.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 11 -
During the three months ended December 31, 2025, The Jiama Mine produced 16,756 tonnes (approximately 37.0 million
pounds) of copper, which decreased from of 20,020 tonnes (approximately 44.1 million pounds) during the comparative
three month period in 2024.
Total production cost of copper per pound increased by 32% due to lower copper grade and increase of R&D in the
three months of 2025 as compared to the same period in 2024. Cash production cost of copper per pound increased as compared to the same quarter in 2024. However, total production cost of copper per pound after by-products and cash production cost of copper per pound after by-product decreased in 2025 as compared to the same three month period in 2024, mainly due to higher by-product revenue from gold and silver. Review of Quarterly and Annual Data Three months ended December 31, 2025 compared to three months ended December 31, 2024 Revenue of US$384.7 million for the fourth quarter of 2025, increased by US$91.1 million from US$293.6 million for the same period in 2024. Revenue from the CSH Mine was US$98.2 million, an increase of US$19.4 million from US$78.8 million for the same
period in 2024. The realized average gold price increased by 55%, from US$2,659/oz in Q4 2024 to US$4,124/oz in Q4
- Gold sold by the CSH Mine was 23,814 ounces (gold produced: 28,684 ounces), compared to 29,641 ounces (gold
produced: 36,719 ounces) for the same period in 2024.
Revenue from the Jiama Mine was US$286.5 million, an increase of US$71.7 million, compared to US$214.8 million
for the same period in 2024. The realized average price of copper increased by 57%, from US$2.42/pound in Q4 2024 to US$3.80/pound in Q4 2025. Total copper sold was 17,652 tonnes (38.9 million pounds) for the three months ended December 31, 2025, a decrease of 11% from 19,931 tonnes (43.9 million pounds) for the same period in 2024. Cost of sales of US$174.8 million for the quarter ended December 31, 2025, a slightly increase of US$3.4 million from
US$171.4 million for the same period in 2024. Cost of sales as a percentage of revenue for the Company decreased from 58% to 45% for the three months ended December 31, 2024 and 2025, respectively. Cost of sales was impacted by
many operation factors such as grade of ore, recovery rates and stripping ratio. Refer to the sections below for details of production factors for each individual mine. Mine operating earnings of US$209.9 million for the three months ended December 31, 2025, an increase of US$87.7
million from US$122.2 million for the same period in 2024. General and administrative expenses increased by US$3.5 million, from US$17.9 million for the quarter ended December 31, 2024 to US$21.4 million for the quarter ended December 31, 2025, partially due to higher taxes and surcharges
resulting from increased revenue in the current quarter. Research and development expenses of US$16.4 million for the three months ended December 31, 2025, increased
from US$8.1 million for the comparative 2024 period. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes. Income from operations of US$171.8 million for the fourth quarter of 2025, increased by US$75.9 million, compared to
US$95.9 million for the same period in 2024. Foreign exchange gain of US$7.4 million for the three months ended December 31, 2025, increased from a loss of US$4.6 million for the same period in 2024. The gain was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 12 -
Interest and other income of US$2.4 million for the three months ended December 31, 2025, increased from a negative
US$0.1 million for the same period in 2024, primarily due to higher interest income earned during the current quarter
compared to the corresponding period last year. Finance costs of US$4.5 million for the three months ended December 31, 2025, decreased by US$0.8 million compared to US$5.3 million for the same period in 2024. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Other expense of US$5.3 million for the three months ended December 31, 2025, increased from US$0.3 million for the same period in 2024. During the current quarter, the Company recognized an impairment loss of U$5.9 million on other non-current assets based on a third-party real estate valuation report, partially offset by lower expenses in other categories. Refer to Note 22 Other non-current assets of the consolidated financial statements for details. Income tax expense of US$44.0 million for the three months ended December 31, 2025, increased by US$26.8 million
from US$17.2 million for the comparative period in 2024. In December 2025, the Company accrued US$23.5 million in withholding tax on declared dividends to shareholders. During the current quarter, the Company had US$25.0 million of deferred tax expense compared to US$9.1 million deferred tax credit for the same period in 2024. Net income of US$127.7 million for the three months ended December 31, 2025, increased by US$59.4 million from
US$68.3 million for the three months ended December 31, 2024. Year ended December 31, 2025 compared to year ended December 31, 2024 Revenue of US$1,310.1 million for the year ended December 31, 2025, increased by US$553.5 million from US$756.6
million for the same period in 2024. Revenue from the CSH Mine was US$338.5 million, an increase of US$91.6 million from US$246.9 million for the same period in 2024. The realized average gold price increased by 39%, from US$2,453/oz in 2024 to US$3,419/oz in the same period of 2025. Gold sold by the CSH Mine was 99,010 ounces (gold produced: 96,816 ounces), compared to 100,682 ounces (gold produced: 108,188 ounces) for the same period in 2024. Revenue from the Jiama Mine was US$971.7 million, an increase of US$462.0 million, compared to US$509.7 million
for the same period in 2024. The realized average price of copper increased by 17%, from US$2.71/pound in 2024 to
US$3.17/pound in the same period of 2025. Total copper sold was 70,959 tonnes (156.4 million pounds) for the year
ended December 31, 2025, an increase of 50% from 47,421 tonnes (104.5 million pounds) for the same period in 2024. Cost of sales of US$626.1 million for the year ended December 31, 2025, an increase of US$56.4 million from US$569.7 million for the same period in 2024. The cost of sales increased due to the resumption of operations at the Jiama Mine, leading to higher production costs as the Phase II processing plants was reactivated. Mine operating earnings of US$684.0 million for the year ended December 31, 2025, an increase of US$497.1 million
from US$186.9 million for the same period in 2024. General and administrative expenses increased by US$12.3 million, from US$47.6 million for the year ended December
31, 2024 to US$59.9 million for the same period in 2025, primarily driven by higher operational support costs associated with the resumption of production at the Jiama Mine. Research and development expenses of US$32.8 million for the year ended December 31, 2025, increased from US$15.7 million for the comparative 2024 period. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 13 -
Income from operations of US$590.1 million for the year ended December 31, 2025, increased by US$466.9 million,
compared to US$123.2 million for the same period in 2024. Foreign exchange loss of US$0.3 million for the year ended December 31, 2025, decreased from US$2.6 million for the same period in 2024. The loss was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB. Interest and other income of US$11.7 million for the year ended December 31, 2025, increased from US$5.1 million for the same period in 2024, primarily due to higher interest income earned during the current period and higher dividend received from China Nonferrous Mining Corporation Limited compared to the corresponding period last year. Finance costs of US$18.8 million for the year ended December 31, 2025, decreased by US$3.6 million compared to
US$22.4 million for the same period in 2024. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Other expense of US$22.5 million for the year ended December 31, 2025, increased from US$10.1 million for the same period in 2024. During the current period, the Company recognized litigation compensation of US$15.0 million arising
from the litigation between Shaanxi Xiaoshanchuan Mineral Resources Development and Construction Co.,Ltd. and the
Company’s subsidiary, Tibet Huatailong Mining Development Co. Ltd. Refer to Note 31 Contingencies of the consolidated financial statements for details. Income tax expense of US$87.9 million for the year ended December 31, 2025, increased by US$60.0 million from US$27.9 million for the comparative period in 2024. In December 2025, the Company accrued US$23.5 million in withholding
tax on declared dividends to shareholders. During the current period, the Company had US$23.7 million of deferred tax expense compared to a deferred tax expense of US$10.3 million for the same period in 2024. Net income of US$472.3 million for the year ended December 31, 2025, increased by US$407.0 million from US$65.3
million for the same period in 2024. NON-IFRS MEASURES The cash cost of production, cash cost after by-product credits and cash cost per ounce and per pound are measures
that are not in accordance with IFRS. The Company has included these metrics to supplement its consolidated financial statements, which are presented in
accordance with IFRS. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance, operating results or financial condition prepared in accordance with IFRS. The Company has included cash production cost per ounce and
per pound data because it understands that certain investors use this information to determine the Company’s ability to generate earnings and cash flow. The measures are not necessarily indicative of operating results, cash flow from operations, or financial condition as determined under IFRS. The following tables provide a reconciliation of cost of sales to the cash costs of production in total dollars and in dollars per gold ounce for the CSH Mine or per copper pound for the Jiama Mine:
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 14 -
Cash production cost for gold is calculated as total cost of sales adjusted by depreciation and depletion and amortization
of intangible assets. Cash production cost of gold per ounce is calculated as total cash production cost divided by total
gold sold (ounces). CSH Mine (Gold) Three months ended December 31,Year ended December 31, 2025202420252024 US$ US$ Per ounceUS$ US$ Per ounceUS$ US$ Per ounceUS$ US$ Per ounce
Total Cost of sales 1 41,593,1381,74751,018,7071,721164,875,8821,665165,574,0051,645 Adjustment – Depreciation & depletion(5,304,923)(223)(12,164,347)(410)(39,205,424)(396)(57,678,651)(573)
Adjustment – Amortization of
intangible assets(56,998)(2)(163,015)(5)(642,989)(6)(787,919)(8)
Total cash production costs36,231,2171,52238,691,3451,306125,027,4691,263107,107,4351,064
Total Gold sold ounces23,81429,65599,010100,682
Cash production cost of gold US$ per ounce calculated as total cash production cost divided by total gold sold ounces. Cash Production cost for copper is calculated as production costs (total cost of sales adjusted by General and administrative expenses and Research and development expenses) adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of copper (pounds) is calculated as total cash production cost divided by total copper sold (pounds).
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 15 - Jiama Mine (Copper with by-products credits) Three months ended December 31,Year ended December 31, 2025202420252024 US$ US$ Per PoundUS$ US$ Per PoundUS$ US$ Per PoundUS$ US$ Per Pound
Total Cost of sales133,232,9293.42120,395,1162.74461,258,1442.95404,152,4933.87
General and administrative expenses20,314,0470.5217,020,6250.3955,871,9790.3643,581,8770.42 Research and development expenses16,398,8990.428,118,5950.1832,798,6090.2115,722,0980.15
Total production cost169,945,9754.36145,534,3363.31549,928,7323.52463,456,4684.44
Adjustment – Depreciation & depletion(21,924,108)(0.56)(21,527,256)(0.49)(94,305,794)(0.60)(66,877,508)(0.64)
Adjustment – Amortization of
intangible assets(6,454,180)(0.17)(7,399,660)(0.17)(28,363,980)(0.18)(19,117,739)(0.18)
Total cash production costs141,567,6873.63116,607,4202.65427,258,9582.74377,461,2213.62
By-products credits(135,694,593)(3.49)(106,554,080)(2.42)(469,218,504)(3.00)(221,844,500)(2.12)
Total cash production costs
after by-products credits5,873,0940.1410,053,3400.23(41,959,546)(0.26)155,616,7211.50
Total Copper sold pounds38,917,01043,940,061156,437,873104,545,457
Cash production cost of copper US$ per pound calculated as total cash production cost divided by total copper sold pounds.
MINERAL PROPERTIES
The CSH Mine
The CSH Mine is located in Inner Mongolia Autonomous Region of China (Inner Mongolia). The property hosts two low-
grade, near surface gold deposits, along with other mineralized prospects. The main deposit is called the Northeast Zone
(the “Northeast Zone”), while the second, smaller deposit is called the Southwest Zone (the “Southwest Zone”).
The CSH Mine is owned and operated by Inner Mongolia Pacific Mining Co. Limited, a Chinese Joint Venture in which the
Company holds a 96.5% interest and Ningxia Nuclear Industry Geological Exploration Institution holds the remaining 3.5%.
The CSH Mine is an open-pit mining operations with a designed mining and processing capacity of 60,000 tpd. In July
2019, CSH updated its mine plan based on a result of latest ultimate limit optimization, in which the production rate was
reduced to 40,000 tpd with a life of mine (“LoM”) of seven years as of 2019. The run-of-mine ore is heap leached with
cyanide solution to extract gold and electro-winned to produce a gold dore which is sold to refiners. In June 2020, the
operation of southwest pit ended.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 16 -
The open-pit operations at the CSH gold mine are nearing the end of its mine life. With the increase in the pit’s depth,
the height and exposed area of the pit wall have increased, and the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. Ensuring slope stability and avoiding systematic risks at this stage is the Company’s top priority to ensure safe and sustainable production. The Company continues to evaluate the potential for underground operations. The major new contracts entered into during the year ended December 31, 2025: Item No.Contract NameCounterpart Subject amount
(US$ millions) Contract period
(effective day
and expiration date) Date of Contract
1Sales Contract for Waste MaterialsHunan Zhongxing
Environmental Protection
Technology Co., Ltd
10.812025.3.24 –
2025.4.24
2025.3.24
2Open-pit to Underground
Engineering Design
China ENFI Engineering
Technology Co., Ltd
5.062025.4.24 –
2033.4.24
2025.4.24
3Sales Contract for Waste MaterialsHunan Zhongxing
Environmental Protection
Technology Co., Ltd
11.272025.6.10 –
2025.7.2
2025.6.10
42025 Open-pit Mine Slope
Remediation Project Contract
China National Gold Group
Third Engineering Co., Ltd.
9.372025.8.27 –
2026.10.31
2025.8.27
5Sales Contract for Waste MaterialsHunan Zhongxing
Environmental Protection
Technology Co., Ltd
19.782025.12.25 –
2026.2.24
2025.12.25
Production Update CSH MineThree months ended December 31,Year ended December 31, 2025202420252024
Ore mined and placed on pad (tonnes)1,834,8261,576,24310,299,4049,208,842 Average ore grade (g/t)0.440.410.490.58 Recoverable gold (ounces)17,01413,18795,735102,866 Ending gold in process and gold dore bars (ounces)142,894146,169142,894146,169 Waste rock mined (tonnes)1,493,9222,800,9387,011,84010,548,732
For the three months ended December 31, 2025, the total amount of ore placed on the leach pad was 1.8 million tonnes,
with total contained gold of 17,014 ounces (529 kilograms). The overall accumulative project-to-date gold recovery rate
remained consistent at approximately 56.63% at the end of December 31, 2025 from 56.47% at the end of September
30, 2025. Of which, gold recovery from the phase I and phase II heap leach pads were 59.77% and 54.67% at December
31, 2025, respectively.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 17 -
Exploration
The CSH Gold Mine drilled 264 meters from hole DDH9200-3, which was remaining from the 2024 drilling program. There
was no other drilling program in 2025 for the CSH Mine.
Mineral Resource Update
CSH Mine Mineral Resources by category, at December 31, 2025 under NI 43-101 are listed below:
Location
Mineral
Resource Category Tonnage
(x1000 t)Au (g/t) Metal Au (t)Au (Moz)
Remaining within
the open pit limit
at a cut-off grade of
0.28 g/t Au
Measured6,0310.684.090.132
Indicated6,6470.724.750.153
M+I12,6780.708.840.285
Inferred2,5760.410.150.005
Underground
at a cut-off grade of
0.30 g/t Au
Measured88,2000.6758.661.89
Indicated89,8500.5852.071.67
M+I178,0500.62110.723.56
Inferred62,0900.4930.680.99
Note: Mineral Resources are reported in relation to a conceptual open-pit mining and underground block caving mining. Mineral Resources are not
Mineral Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate.
Raw assays have been capped. Mineral Resources include Mineral Reserves.
Mineral Resources are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching
& metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. Additional Mineral Resources are reported at a
cut-off grade of 0.30 g/t Au for underground block caving mining, based on the following parameters: the heap leaching & metallurgical
recovery of 60% and gold bullion market price of USD1,980 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce
is equal to 31.1035 grams.
The mineral resource estimates include Au only. CGME Consulting limited (CGME) has estimated the mineral resources of the CSH gold
deposit based on a cut-off grade of 0.28 g/t Au within the optimized ultimate open-pit limit and a cut-off grade of 0.30 g/t Au below the
open pit limit on April 1, 2022. The resource estimate was conducted using Ordinary Kriging, validated by Inversed Distance Squared
method, and Micromine modelling software.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 18 -
CGME considers that blocks estimated for the first estimation pass with an average anisotropic distance to samples of less than 45 m can be classified
as Measured Mineral Resources, and blocks estimated for the second estimation pass with an average anisotropic distance to samples of less than
80 m can be classified as Indicated Mineral Resources, and blocks estimated for the third estimation pass with an average anisotropic distance to
samples of not more than 150 m can be categorised as Inferred Mineral Resources. For those Measured and Indicated Mineral Resource blocks,
CGME considers that the degree of confidence is sufficient to allow an appropriate application of technical and economic parameters to support
mine planning and to allow evaluation of the economic viability of the deposit, which is also adequate to support the open pit mining operations.
In CGME’s opinion, the upper portions of gold mineralization at the CSH Gold Project are amenable to extraction by open pit mining with a cut-off
grade optimised of 0.28 g/t Au, and the block caving mining operation would be the choice for extraction below the optimized open pit limits with
a cut-off grade of 0.30 g/t Au in this estimation based on a Reasonable Prospect for Eventual Economic Extraction (“RPEEE”). It is noted that the
partial mineral resources outside of the open pit limit but above the bottom plane may not be amenable to extraction in the future. Meanwhile,
the mineral resources located below 840 m ASL at NE zone and 1,250 m ASL at SW zone may not be amendable to extraction in the future due to either excessive depth or high dilution. These mineral resources that may not be amendable to extraction in the future are excluded from the Mineral Resource Statement in this Report. Block model quantity and grade estimates for the CSH gold deposit were classified according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Yuan Chen, MSc., MAIG (M4014)/RPGeo (10262) (April 2022), an independent Qualified Person for the
purposes of National Instrument 43-101 and updated by Mr. Yingting Guo, MMSA., PGeo., an independent Qualified Person for the purposes of National Instrument 43-101 on December 31, 2025. Mineral Reserves Update CSH Mine Mineral Reserves by category at December 31, 2025 under NI 43-101 are summarized below: TypeT (x 1,000)Diluted Au g/t Metal Au tAu Moz
Proven6,4050.644.110.13 Probable7,2220.674.870.16
Total13,6270.668.980.29
Note: Mineral Reserves are reported based on the optimized ultimate open pit limit. All figures are rounded to reflect the relative accuracy of the
estimate. Mineral Reserves are included in Mineral Resources.
Mineral Reserves are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching
& metallurgical recovery of 60% and gold bullion market price of USD1,568 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and
one troy ounce is equal to 31.1035 grams.
The Proven Mineral Reserves are 6.41 Mt at a grade of 0.64 g/t Au for the gold content of 4.11 t or 0.13 Moz, and the Probable Mineral
Reserves are 7.22 Mt at a grade of 0.67 g/t Au for the gold content of 4.87t or 0.16 Moz, totaling Mineral Reserves of 13.63 Mt at a grade
of 0.66 g/t Au for the gold content of 8.98 t or 0.29 Moz.
The Mineral Reserves for the CSH gold deposit were estimated according to the CIM Definition Standards for Mineral Resources and
Mineral Reserves (May 2014) by Guangpian Zhang, AusIMM, a full time Principal Mining Engineer for CGME and a Qualified Person for
the purposes of National Instrument 43-101.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 19 -
The Jiama Mine
Jiama is a large copper-gold polymetallic deposit containing copper, gold, silver, molybdenum, lead and zinc, located in
the Gandise metallogenic belt in Tibet Autonomous Region of China.
The Jiama Mine has both underground mining and open-pit mining operations. Phase I of the Jiama Mine commenced
operation in the latter half of 2010 and reached its design capacity of 6,000 tpd in early 2011. Phase II of the Jiama Mine commenced mining operations in 2018 with 44,000 tpd design capacity. The combined mining and processing design
capacity at the Jiama Mine is 50,000 tpd. The major new contracts entered into during the year ended December 31, 2025: Item No.Contract NameCounterpart Subject
amount
(US$ millions) Contract period
(effective day and
expiration date) Date of Contract
1Tibet Huatailong Mining Development Co., Ltd. Jiama Copper Polymetallic Mine Youlongbu Tailings Dam PC General Contracting Contract China National Gold Group Construction Co., Ltd.244.252025.03 – 2027.062025.03 2Molybdenum Concentrate Purchase and Sales ContractChina National Gold Group (Shanghai) Trading Co., Ltd. 50.132025.05 – 2028.052025.05 3Supplementary Agreement to the “Tibet Huatailong Mining Development Co., Ltd. 2022-2024 Copper Concentrate Powder Purchase and Sales Contract China National Gold Group International Trading Co., Ltd. 69.632025.05 – 2025.062025.05 4Tibet Huatailong Mining Development Co., Ltd. 2025 Machinery and Equipment Leasing Project Contract Sichuan Haotianyu Construction Machinery Leasing Co., Ltd. 2.912025.04 – 2025.122025.04 5Tibet Huatailong Mining Development Co., Ltd. Jiama Copper Polymetallic Mine Youlongbu Tailings Dam General Contracting and Supervision Project Service Contract Xinjiang Nonferrous Metallurgy Design and Research Institute Co., Ltd. 3.062025.06 – 2027.112025.06 6Tibet Huatailong Mining Development Co., Ltd. Blasting Engineering Construction Service Project Construction Contract Tibet Gaozheng Blasting Engineering Co., Ltd.9.022025.06 – 2026.052025.06 7Tibet Huatailong Mining Development Co., Ltd.23-26 Sub-dam Embankment and Drainage Works of Guolanggou Tailings Pond EPC General Contracting Project BGRIMM Technology Group Co., Ltd. (Consortium Leader), Jiangxi Copper Industry Group Construction Co., Ltd. (Consortium Member) 14.032025.5.6- 2026.6.292025.5.6 8Copper Concentrates Purchase and Sales ContractChina National Gold Group (Shanghai) Trading Co., Ltd. 2,031.282025.5.27-2028.5.272025.5.27 9Contract for Blasting Engineering Construction Services of Tibet Huatailong Mining Development Co., Ltd. Tibet Zhongjin Xinlian Blasting Engineering Co., Ltd.6.162025.6.1-2026.5.312025.05.30 10Sodium HydrosulfideZibo Tengxiang Economic and Trade Co., Ltd.5.122025.6.26-2026.6.252025.6.26 11CementChina Jinyu Gold Materials Co., Ltd.8.032025.6.30-2026.6.292025.6.30 12Sodium HydrosulfideFengshi Chemical (Shanghai) Co., Ltd.7.692025.6.30-2026.6.292025.6.30
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 20 -
Item
No.Contract NameCounterpart
Subject
amount
(US$ millions) Contract period
(effective day and
expiration date) Date of Contract
13Copper-Lead-Zinc Mixed Concentrates Purchase and Sales Contract China National Gold Group (Shanghai) Trading Co., Ltd. 791.212025.7.18-2027.7.172025.7.18 14CementTibet Jiaofa Transportation Industry Co., Ltd.8.012025.11.21- 2026.11.20 2025.11.21 15Steel BallsBaiyin Hengcheng Machinery Manufacturing Co., Ltd.3.042025.11.30- 2026.11.29 2025.11.30 16Steel BallsInner Mongolia Jinyu Fengxing Mining Wear-resistant Materials Co., Ltd. 3.302025.12.29- 2026.12.28 2025.12.29
Production Update Jiama MineThree months ended December 31,Year ended December 31, 2025202420252024
Ore processed (tonnes)2,871,8823,095,47111,838,9168,197,448 Average copper ore grade (%)0.690.780.710.71 Copper recovery rate (%)85828482 Average gold grade (g/t)0.280.320.290.29 Gold recovery rate (%)73747370 Average silver grade (g/t)20.1421.9121.1519.72 Silver recovery rate (%)69687062 Average Lead grade (%)0.771.160.961.24 Lead recovery rate (%)77787875 Average Zinc grade (%)0.530.610.580.68 Zinc recovery rate (%)73727372 Average Moly grade (%)0.0280.030.0370.029 Moly recovery rate (%)3224.973323.20
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 21 -
Exploration
In 2025, Jiama has carried out exploration work in the mine deep and peripheral areas of the Jiama mining area, completing
a total of 1,254 cubic meters of pit exploration, 4,870 meters of underground drilling, and 25,450 meters of surface drilling.
The main results have been achieved as below: 1. further controlling the main skarn orebody of the interlayered structure
in the Jiama mining area, defining the skarn orebodies in the surrounding contact zone; 2. two gold mineralization zones,
one zinc mineralization zone, and one molybdenum mineralization zone have been defined at Bayi Ranch prospecting
area. Since the consolidation of mineral rights in Jiama area, the Jiama Mine has completed a total of 297,720 meters of drilling with 622 holes. Mineral Resources Estimate The Mineral Resource estimate was originally independently completed by Runge Pincock Minarco (RPM) Global dated
12th November 2012. Mining One was provided with the block model and all files related to construction of the model. The information contained within this report is based on information provided to Mining One, which has been verified
and, in some instances, refined by Mining One. The Resource estimate is based on three dimensional geological and
mineralisation models that were informed by the drill hole data set. The Resource is based on three main geological domains that represent Skarn, Hornfels and Porphyry lithologies;
mineralisation is hosted within each of these domains. Domain boundaries were constructed using a combination of the geology domains and a 0.1% Cu equivalent cut–off for the mineralisation. Standard wireframing procedures were used in relation to extrapolation of polygons half the drill spacing distance past known data points and tapering of zone thickness on the periphery of the domains. Mining One Pty Ltd. noted that gold and silver mineralization within the ore body had a significantly higher spatial variability than the other elements. This classification takes into account the proposed large scale mining techniques where Au and Ag will only be credits to the overall products from the operations. Mining One Pty Ltd has assumed that Au and Ag will not be assigned a single cut-off grade for a selected mining block and will be mined in conjunction with the other elements.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 22 - Jiama Mine resources by category as of December 31, 2025 under NI 43-101: Jiama Project – Cu, Mo, Pb, Zn, Au, and Ag Mineral Resources under NI 43-101 Reported at a 0.3% Cu Equivalent Cut off grade*, as of December 31, 2025 Class Quantity MtCu %Mo %Pb %Zn %Au g/tAg g/t Cu Metal (kt) Mo Metal (kt) Pb Metal (kt) Zn Metal (kt)Au MozAg Moz
Measured90.570.380.040.040.020.075.04344.7633.2233.1016.600.2114.67 Indicated1294.560.400.030.050.030.105.485126.91445.26605.10375.054.12227.97 M+I1385.130.400.030.050.030.105.455471.67478.48638.20391.654.33242.64 Inferred405.180.310.030.080.040.105.131256.07121.56324.15174.611.3166.83
Note: Figures reported are rounded which may result in small tabulation errors. The prices of Cu, Mo, Pb, Zn, Au and Ag are US$2.9/lbs; US$15.5/lbs; US$2.9/lbs; US$0.95/lbs; US$1,300/oz and $20/oz respectively. The Copper Equivalent basis for the reporting of resources has been compiled on the following basis: CuEq Grade: = ( Ag Grade * Ag Price + Au Grade * Au Price + Cu Grade * Cu Price + Pb Grade * Pb Price + Zn Grade * Zn Price + Mo Grade * Mo Price)/Copper Price The Mineral Resources include the Mineral Reserves Resource Estimate by Runge Pincock Minarco on 12th November of 2012 and updated by Mining One Pty Ltd. In 2014 and by Tony Guo, P.Geo, a Qualified Person as defined by NI 43-101 in 2025.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 23 - Mineral Reserves Estimate The selected mining strategies developed by CGDI in conjunction with China Gold consider conventional truck shovel mining for the Jiaoyan and South open pits. Various mining methods have been proposed for the Phase II Expansion Underground Mine with the primary method being Sub Level Stoping with fill (Primary/Secondary/(Tertiary)). The reserve estimate for the Jiama Project underground mine is based on a combination of Sub Level Open Stoping with Paste fill, Room and Pillar and Cut and Fill. The mineral reserve estimate is summarised below which are inclusive of the modifying factors for mining recovery and dilution. Jiama Mine reserves by category as of December 31, 2025 under NI 43-101: Jiama Project Statement of NI 43-101 Mineral Reserve Estimate as of December 31, 2025 Class Quantity MtCu %Mo %Pb %Zn %Au g/tAg g/t Cu Metal (kt) Mo Metal (kt) Pb Metal (kt) Zn Metal (kt)Au MozAg Moz
Proven16.600.600.050.020.020.197.6699.618.303.323.320.104.09 Probable320.230.600.030.130.070.1610.381921.3796.07416.30224.161.65106.88 P+P336.830.600.040.120.070.1610.252020.98104.37419.62227.481.75111.97
Notes:
- All Mineral Reserves have been estimated in accordance with the JORC code and have been reconciled to CIM standards as prescribed by the NI 43-101.
- Mineral Reserves were estimated using the following mining and economic factors: Open Pits: a) 5% dilution factor and 95% recovery were applied to the mining method; b) an overall slope angles of 43 degrees; c) a copper price of US$2.9/lbs; d) an overall processing recovery of 88 – 90% for copper. Underground: a) 10% dilution added to all Sub-Level Open Stoping; b) Stope recovery is 87% for Sub-Level Open Stoping; c) An overall processing recovery of 88 – 90% for copper.
- The cut-off grade for Mineral Reserves has been estimated at copper equivalent grades of 0.3% Cu (NSR) for the open pits and 0.45% Cu (NSR) for the underground mine.
- Mineral Reserves have been estimated by Runge Pincock Minarco on 12th November of 2012 and updated by Mining One Pty Ltd. in 2014 and by Tony Guo, MMSA(QP), a Qualified Person as defined by NI 43-101 in 2025.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 24 -
LIQUIDITY AND CAPITAL RESOURCES
The Company operates in a capital intensive industry. The Company’s liquidity requirements arise principally from the need
for financing its mining and mineral processing operations, exploration activities and acquisition of exploration and mining
rights. The Company’s principal sources of funds have been proceeds from borrowings from commercial banks, corporate
bonds financing, equity financings, and cash generated from operations. The Company’s liquidity primarily depends on
its ability to generate cash flow from its operations and to obtain external financing to meet its debt obligations as they
become due, as well as the Company’s future operating and capital expenditure requirements. At December 31, 2025, the Company had an accumulated surplus of US$813.1 million, working capital of US$580.0
million and borrowings of US$533.4 million. The Company’s cash balance at December 31, 2025 was US$739.4 million, among which cash and cash equivalents was US$399.4 million, Restricted cash was US$34.2 million, term deposits was US$305.9 million. Management believes that its forecast operating cash flows are sufficient to cover the next twelve months of the Company’s operations including its planned capital expenditures and current debt repayments. The Company’s borrowings are comprised of US$217.0 million of short term debt facilities with interest rates ranging from 1.25% to 4.36% per annum arranged
through various banks. In addition, on November 3, 2015, the Company entered into a Loan Facility agreement with a
syndicate of banks, led by Bank of China. The lenders agreed to lend an aggregate principal amount of RMB3.98 billion, approximately US$613 million with the initial interest rate of 2.83% per annum. The proceeds from the Loan Facility are to be used for the development of the Jiama Mine. The loan is secured by the mining rights for the Jiama Mine. As of
December 31, 2025 the Company has fully drawn under this Facility. The outstanding loan balance is RMB1.39 billion
(approximately US$197 million), bearing an annual interest rate of 1.5% maturing on November 5, 2028. On April 29, 2020, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB1.4 billion (approximately US$197.8 million).As of
December 31, 2025, the Company has fully drawn down under this facility. The outstanding loan balance is RMB824
million (approximately US$117 million), bearing an annual interest rate of 1.95%, with maturity on April 28, 2033. On August 8, 2025, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB2.1 billion (approximately US$294 million).As of
December 31, 2025, the Company has drawn down RMB50 million (approximately US$7.11 million) under this facility,
bearing an annual interest rate of 1.5%, with maturity on June 21, 2030. On May 31, 2023, the Company obtained a bilateral loan with an aggregate principal amount of RMB400 million
(approximately US$56.5 million) from China Gold Finance Co., Ltd. at an annual interest rate of 2.05%. As of December 31, 2025, the outstanding loan balance was RMB400 million (approximately US$56.91 million).
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 25 -
On November 9, 2023, the Company obtained a bilateral loan with an aggregate principal amount of RMB100 million
(approximately US$14.1 million) from China Construction Bank at an annual interest rate of 1.85%. As of December 31, 2025, the outstanding loan balance was RMB90 million (approximately US$12.8 million). On May 13, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million
(approximately US$28.2 million) from Lhasa Chengguan District Sub branch of Agricultural Bank of China Co., Ltd. at an annual interest rate of 1.85% for a term of 3 years. As of December 31, 2025, the outstanding loan balance was RMB65 million (approximately US$9.2 million). On August 20, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million
(approximately US$28.04 million) from China Gold Finance Co., Ltd. at an annual interest rate of 2.45% for a term of 3 years. As of December 31, 2025, the outstanding loan balance was RMB180 million (approximately US$25.61 million). On May 12, 2025, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$64 million from China Construction Bank (Asia) Corporation Limited, bearing interest at a floating rate based on Term SOFR. On June 10, 2025, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$15 million from China Everbright Bank Co., Ltd., Hong Kong Branch, bearing interest at a floating rate based on Term SOFR. The Company believes that the availability of debt financing in China at favorable rates will continue for the foreseeable
future. The Company continues to review and assess its assets for impairment as part of its financial reporting processes. To date, the assessment carried out by the Company support the carrying values of the Company’s assets and no impairment has been required. However, the management of the Company continues to evaluate key assumptions on estimates and management judgements in order to determine the recoverable amount of the CSH Mine and the Jiama Mine.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 26 - CASH FLOWS The following table sets out selected cash flow data from the Company’s consolidated cash flow statements for the year ended December 31, 2025 and December 31, 2024. Year ended December 31, 20252024 US$’000US$’000
Net cash from operating activities709,984306,896 Net cash used in investing activities(246,828)(204,875) Net cash used in financing activities(253,685)(16,171) Net increase (decrease) in cash and cash equivalents209,47185,850 Effect of foreign exchange rate changes on cash and cash equivalents6,152692 Cash and cash equivalents, beginning of period183,77997,237
Cash and cash equivalents, end of period399,402183,779
Operating cash flow
For the year ended December 31, 2025, net cash inflow from operating activities was US$710.0 million which is primarily
attributable (i) profit before income tax of US$560.2 million (ii) depreciation of property, plant and equipment of US$132.0
million and (iii) decrease in restricted bank balances of US$32.5 million, partially offset by (i) income tax paid of US$47.6
million (ii) interest paid of US$15.8 million and (iii) Interest income of US$8.7 million.
Investing cash flow
For the year ended December 31, 2025, the net cash outflow from investing activities was US$246.8 million which is
primarily attributable to (i) placement of term deposits of US$306.6 million (ii) payment for acquisition of property, plant
and equipment of US$50.1 million and (iii) payment for land use right of US$19.8 million, offset by (i) release of term
deposits of US$119.0 million and (ii) interest income received of US$8.7 million.
Financing cash flow
For the year ended December 31, 2025, the net cash outflow mainly from financing activities was US$253.7 million
which is primarily attributable to (i) repayment of borrowings of US$306.2 million (ii) dividends paid to shareholders of the
Company of US$31.7 million and (iii) dividends paid to non-controlling shareholders of US$1.2 million offset by proceeds
of bank and other borrowings of US$86.0 million.
Expenditures Incurred
For the year ended December 31, 2025, the Company incurred mining costs of US$61.1 million, mineral processing costs
of US$104.7 million and transportation costs of US$3.4 million.
Gearing ratio
Gearing ratio is defined as the ratio of consolidated total debt to consolidated total equity. As at December 31, 2025, the
Company’s total debt was US$533.4 million and the total equity was US$2,337.0 million. The Company’s gearing ratio
was therefore 0.23 as at December 31, 2025 compared to 0.26 as at September 30, 2025.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 27 -
SIGNIFICANT INVESTMENTS, ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES. ASSOCIATES
AND JOINT VENTURES, AND FUTURE PLAN FOR MATERIAL INVESTMENTS OF CAPITAL
ASSETS Other than as disclosed elsewhere in this MD&A or in the consolidated financial statements for the year ended December 31, 2025, there were no significant investments held by the Company, nor were there any material acquisitions or disposals of subsidiaries, associates and joint ventures during the year ended December 31, 2025. Other than as disclosed in this MD&A, there was no plan authorized by the Board for other material investments or additions of capital assets at the date of this MD&A. CHARGE ON ASSETS Other than as disclosed elsewhere in this MD&A and condensed consolidated financial statements, none of the Company’s assets were pledged as at December 31, 2025. EXPOSURE TO FLUCTUATIONS IN EXCHANGE RATES AND RELATED HEDGES The Company is exposed to the financial risk related to the fluctuation of foreign exchange rates for the monetary assets and liabilities denominated in the currencies other than the functional currencies to which they relate. The Company has not hedged its exposure to currency fluctuation. However, the Management monitors foreign exchange exposure and will consider hedging significant foreign currency exposure should the need arise. Refer to Note 33, Financial Instruments, in the annual consolidated financial statements for the year ended December 31, 2025. COMMITMENTS Commitments include principal payments on the Company’s bank loans and syndicated loan facility, corporate bonds,
and capital commitments in respect of the future acquisition of property, plant and equipment and construction for both the CSH Mine and the Jiama Mine. The Company’s capital commitments relate primarily to the payments for purchase of equipment and machinery for both mines and payments to third-party contractors for the provision of mining and exploration engineering work and mine
construction work for both mines. The Company has entered into contracts that prescribe such capital commitments;
however, liabilities relating to them have not yet been incurred. Refer to Note 34, Commitments, in the annual consolidated financial statements for the year ended December 31, 2025. The following table outlines payments for commitments for the periods indicated: Total Within
One year Within Two
to five years Over
five years US$’000US$’000US$’000US$’000
Principal repayment of bank loans504,985217,004219,17168,810 Entrusted loan payable28,45428,454––
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 28 -
In addition to the table set forth above, the Company has entered into service agreements with third-party contractors for
the provision of mining and exploration engineering work and mine construction work for the CSH Mine. The fees for such
work performed and to be performed each year varies depending on the amount of work performed. The Company has
similar agreements with third party contractors for the Jiama Mine. RELATED PARTY TRANSACTIONS China National Gold Group Co., Ltd. (formerly known as China National Gold Group Corporation) (“CNG”) owned 40.01
percent of the outstanding common shares of the Company as at December 31, 2024 and December 31, 2025. The Company had major related party transactions with the following companies related by way of shareholders or
shareholder in common: The Company’s subsidiary, Inner Mongolia Pacific is a party to a non-exclusive contract for the purchase and sale of doré with CNG (the “Dore Sales Contract”) pursuant to which Inner Mongolia Pacific sells gold doré bars to CNG. The pricing is based on the monthly average price of gold ingot as quoted on the Shanghai Gold Exchange and the daily average price of silver as quoted on the Shanghai Huatong Platinum & Silver Exchange prevailing at the time of each relevant purchase order during the contract period. The Dore Sales Contract has been in effect since October 24, 2008 and was renewed for a new term that commenced on January 1, 2018 and expired on December 31, 2020, which renewal was approved by the Company’s shareholders on June 28, 2017. On June 16, 2020, the third Supplemental Contract for Purchase and Sale of Dore was approved by the Company’s Shareholders, commencing on January 1, 2021 and expiring on December 31,
- On June 29, 2023, the fourth supplemental Contract for Purchase and Sale of Dore was approved by the Company’s
Shareholders, commencing on January 1, 2024 and expiring on December 31, 2026.
Revenue from sales of gold doré bars to CNG was US$338.5 million for the year ended December 31, 2025 which increased
from US$246.9 million for the year ended December 31, 2024.
The Company is also a party to a Product and Service Framework Agreement with CNG, pursuant to which CNG provides
construction, procurement and equipment financing services to the Company and also purchases the copper concentrates
produced at the Jiama Mine. The quantity of copper concentrates, pricing terms and payment terms may be established
from time to time by the parties with reference to the pricing principles for connected transactions set out under the Product
and Service Framework Agreement. On June 28, 2017, the Supplemental Product and Service Framework Agreement was
approved and extended to expire on December 31, 2020. On June 16, 2020, the third Supplemental Product and Service
Framework Agreement was approved by the Company’s Shareholders, commencing on January 1, 2021 and expiring on
December 31, 2023. On June 29, 2023, the fourth Supplemental Product and Service Framework Agreement was approved
by the Company’s Shareholders, commencing on January 1, 2024 and expiring on December 31, 2026. For the year
ended December 31, 2025, revenue from sales of copper concentrate and other products to CNG was US$964.8 million compared to US$505.1 million for the same period in 2024. For the year ended December 31, 2025, construction services of US$139.1 million were provided to the Company by
subsidiaries of CNG compared to US$91.3 million for the same period in 2024.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 29 -
In addition to the aforementioned major related party transactions, the Company also obtains additional services from
related parties in its normal course of business, including a Loan Agreement and a Deposit Services Agreement entered into on March 25, 2019, December 31, 2019, December 22, 2020 and a Financial Service Agreement on May 5, 2021 among the Company and China Gold Finance. The Company and China Gold Finance entered into a 2024 Financial
Service Agreement on June 6, 2024. As part of the 2024 Financial Service Agreement, China Gold Finance agreed to
provide the Company with a range of financial services including (a) Deposit Services, (b) Lending Services, (c) Settlement Services and (d) Other Financial Services. On June 27, 2024, the 2024 Financial Services Agreement was approved by
the Company’s Shareholders, commencing on the date of the approval by the Independent Shareholders and up to and including December 31, 2026. Refer to Note 30 of the consolidated financial statements for details of significant related party transactions during the
year ended December 31, 2025. PROPOSED TRANSACTIONS The Board of Directors has given the Company approval to conduct reviews of a number of projects that may qualify as acquisition targets through joint venture, merger and/or outright acquisitions. The Company did not have any material
acquisition and disposal of subsidiaries and associated companies for the year ended December 31, 2025. The Company continues to review possible acquisition targets. CRITICAL ACCOUNTING ESTIMATES In the process of applying the Company’s accounting policies, the Directors of the Company have identified accounting
judgments and key sources of estimation uncertainty that have a significant effect on the amounts recognized in the audited annual consolidated financial statements. Key assumptions concerning the future and other key sources of estimation uncertainty at the end of each reporting period that have a risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next twelve
months are described in Note 4 of the audited annual consolidated financial statements for the year ended December
31, 2025. CHANGE IN ACCOUNTING POLICIES A summary of new and revised IFRS standards and interpretations are outlined in Note 2 of the audited annual consolidated financial statements as at December 31, 2025. FINANCIAL INSTRUMENTS AND OTHER INSTRUMENTS The Company holds a number of financial instruments, the most significant of which are equity securities, accounts
receivables, accounts payables, cash and loans. The financial instruments are recorded at either fair values or amortized amount on the balance sheet. The Company did not have any financial derivatives or outstanding hedging contracts as
at December 31, 2025.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 30 -
OFF-BALANCE SHEET ARRANGEMENTS
As at December 31, 2025, the Company had not entered into any off-balance sheet arrangements.
DIVIDEND AND DIVIDEND POLICY
The Company’s dividend policy is a key component of its long-term growth strategy. It aims to optimize capital allocation to
drive business expansion while maintaining stable returns for shareholders. After successfully distributing special dividends
for three consecutive years (2021-2023), the Company is introducing an enhanced dividend policy comprised of a base
dividend supplemented by a variable component that adjusts based on financial performance and market conditions.
Basic dividend: Subject to profitability in the previous financial year and after assessing the Company’s cash flow position
and future capital requirements, the Company aims to distribute a basic dividend at a payout ratio of 30% of the net profit
from the preceding financial year, with cash dividends paid annually.
Variable Component: Subject to favorable market conditions and sufficient funds, the Company may distribute special
dividends in addition to the basic dividend. Dividends may vary in amount and consistency or be discontinued at the Board of Directors’ discretion depending on
variables including but not limited to operational cash flows, Company development requirements and strategies, spot
metal prices, taxation, general market conditions and other factors. Subsequent to the end of the reporting period, a dividend in respect of the year ended December 31, 2025 of US$0.47 per common share, (the basic dividend of US$140,088,841, and the special dividend of US$46,696,280) in an aggregate amount of US$186,785,121, has been declared by the directors of the Company upon the approval of the board resolution dated March 30, 2026. OUTSTANDING SHARES As of December 31, 2025 the Company had 396,413,753 common shares issued and outstanding. DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING Management is responsible for the design of disclosure controls and procedures (“DC&P”) and the design of internal
control over financial reporting (“ICFR”) to provide reasonable assurance that material information relating to the Company, including its consolidated subsidiaries, is made known to the Company’s certifying officers. The Company’s Chief Executive Officer and Chief Financial Officer have each evaluated the Company’s DC&P and ICFR as of December 31, 2025 and, in accordance with the requirements established under Canadian National Instrument 52-109 – Certification of Disclosure
in Issuer’s Annual and Interim Filings, the Chief Executive Officer and Chief Financial Officer have concluded that these controls and procedures were effective as of December 31, 2025, and provide reasonable assurance that material information relating to the Company is made known to them by others within the Company and that the information required to be
disclosed in reports that are filed or submitted under Canadian securities legislation are recorded, processed, summarized and reported within the time period specified in those rules.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 31 -
The Company’s Chief Executive Officer and Chief Financial Officer have used the Committee of Sponsoring Organizations
of the Treadway Commission (COSO) 2013 framework to evaluate the Company’s ICFR as of December 31, 2025 and have
concluded that these controls and procedures were effective as of December 31, 2025 and provide reasonable assurance
that financial information is recorded, processed, summarized and reported in a timely manner. Management is required
to apply its judgment in evaluating the cost-benefit relationship of possible controls and procedures. The result of the
inherent limitations in all control systems means design of controls cannot provide absolute assurance that all control
issues and instances of fraud will be detected. During the year ended December 31, 2025, there were no changes in the Company’s DC&P or ICFR that materially affected, or are reasonably likely to materially affect, the Company’s internal
control over financial reporting. RISK FACTORS There are certain risks involved in the Company’s operations, some of which are beyond the Company’s control. Aside
from risks relating to business and industry, the Company’s principal operations are located within the People’s Republic of China and are governed by a legal and regulatory environment that in some respects differs from that which prevails in other countries. Readers of this MD&A should give careful consideration to the information included in this document and the Company’s audited annual consolidated financial statements and related notes. Significant risk factors for the Company are metal prices, government regulations, foreign operations, environmental compliance, the ability to obtain additional
financing, risk relating to recent acquisitions, dependence on management, title to the Company’s mineral properties,
natural disasters, pandemics such as COVID-19 and litigation. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks. For details of risk factors, please
refer to the Company’s annual audited consolidated financial statements, and Annual Information Form filed from time to time on SEDAR+ at www.sedarplus.ca and www.hkex.com.hk. QUALIFIED PERSON Disclosure of scientific or technical information in this MD&A was reviewed and approved by Mr. Tony Guo, MMSA(QP), the Company’s Qualified Person (“QP”) as defined by National Instrument 43-101. March 30, 2026
INDEPENDENT AUDITOR’S REPORT
- 32 -
TO THE SHAREHOLDERS OF
CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD.
(incorporated in British Columbia, Canada with limited liability)
OPINION
We have audited the consolidated financial statements of China Gold International Resources Corp. Ltd. (the “Company”)
and its subsidiaries (collectively referred to as the “Group”) set out on pages 37 to 118, which comprise the consolidated
statement of financial position as at December 31, 2025, and the consolidated statement of profit or loss and other
comprehensive income, consolidated statement of changes in equity and consolidated statement of cash flows for the
year then ended, and notes to the consolidated financial statements, including material accounting policy information. In our opinion, the consolidated financial statements give a true and fair view of the consolidated financial position of the Group as at December 31, 2025, and of its consolidated financial performance and its consolidated cash flows for the year then ended in accordance with IFRS Accounting Standards as issued by the International Accounting Standards Board
(“IASB”) and have been properly prepared in compliance with the disclosure requirements of the Hong Kong Companies Ordinance. BASIS FOR OPINION We conducted our audit in accordance with International Standards on Auditing (“ISAs”). Our responsibilities under those standards are further described in the Auditor’s Responsibilities for the Audit of the Consolidated Financial Statements
section of our report. We are independent of the Group in accordance with the “Code of Ethics for Professional Accountants”
issued by the Hong Kong Institute of Certified Public Accountants (“Code”), as applicable to audits of financial statements of public interest entities. We also have fulfilled our other ethical responsibilities in accordance with the Code. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion. KEY AUDIT MATTER Key audit matter is the matter that, in our professional judgment, was of most significance in our audit of the consolidated financial statements of the current period. This matter was addressed in the context of our audit of the consolidated financial statements as a whole, and in forming our opinion thereon, and we do not provide a separate opinion on this matter.
TO THE SHAREHOLDERS OF
CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
KEY AUDIT MATTER (Cont’d)
Key audit matterHow our audit addressed the key audit matter
Gold in Progress
Refer to summary of accounting policies on “inventories” in note 3,
accounting estimates and judgements in note 4(b) and disclosure
of inventory in note 17 to the consolidated financial statements.
For the year ended December 31, 2025, the carrying amount of
inventory was approximately US$295 million. Inventory of the Group
mainly includes gold in process inventory of approximately US$249
million, representing approximately 7.4% of the Group’s total assets.
The Group measured its inventory at the lower of cost and estimated
net realisable value. Gold in process inventory represents ore placed
on leach pads and in process through heap leaching operations.
Due to the nature of heap leaching, the quantity of recoverable gold
cannot be directly measured and is instead estimated using models
based on ore tonnage, assay grades and expected recovery rates.
Assumptions and estimations are required in determining the
quantity of gold in process inventories including the gold contained
in the ore placed on leach pads and correspondingly gold that
is expected to be recovered. The Group could be required to
write down the recorded value of its gold in process inventories if
estimations and assumptions are inaccurate. Because the nature
of leaching process inherently limits the ability to precisely monitor
inventory levels. The actual recovery of gold from the leach pad
is not known until the leaching process has concluded at the end
of the mine life.
We have identified existence and valuation on gold in process
inventory as a key audit matter because of its significance to
the Group’s consolidated financial statements and involvement
of significant management estimates in determining estimated
outcomes of the models in assessing the existence and valuation
of inventory as mentioned in the forgoing paragraphs.
Our procedures in relation to the existence of gold in
process inventory included:
• Obtained an understanding of the Group’s
process and controls over estimation of gold in
process.
• Tested the underlying production data used
in estimation of gold in process used by
management.
• Obtained ore samples during a site visit and
submitted these samples to an independent
external laboratory testing to assess the reliability
and consistency of assay grades used by
management.
• Engaged auditors’ expert to assist our assessment
on the appropriateness of recovery rates
adopted by management from heap leaching
gold processing and the reasonableness on the
model applied by management in estimating
gold in process from heap leaching.
• Tested the mathematical accuracy of the gold-
in-process estimation model and independently
recalculated the estimated recoverable gold
based on management’s key assumptions.
• Performed sensitivity analysis on assessing the
possible impact of reasonably changes in critical
assumption such as recovery rates.
INDEPENDENT AUDITOR’S REPORT
- 33 -
TO THE SHAREHOLDERS OF
CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
OTHER MATTERS
The consolidated financial statements of the Group for the year ended December 31, 2024 were audited by another auditor
who expressed an unmodified opinion on those statements on March 27, 2025.
OTHER INFORMATION
The directors are responsible for the other information. The other information comprises the information included in the
annual report, but does not include the consolidated financial statements and our auditor’s report thereon.
Our opinion on the consolidated financial statements does not cover the other information and we do not express any
form of assurance conclusion thereon.
In connection with our audit of the consolidated financial statements, our responsibility is to read the other information and,
in doing so, consider whether the other information is materially inconsistent with the consolidated financial statements
or our knowledge obtained in the audit or otherwise appears to be materially misstated. If, based on the work we have
performed, we conclude that there is a material misstatement of this other information, we are required to report that fact.
We have nothing to report in this regard.
RESPONSIBILITIES OF DIRECTORS FOR THE CONSOLIDATED FINANCIAL STATEMENTS
The directors are responsible for the preparation of the consolidated financial statements that give a true and fair view in
accordance with IFRS Accounting Standards as issued by the IASB and the disclosure requirements of the Hong Kong
Companies Ordinance, and for such internal control as the directors determine is necessary to enable the preparation of
consolidated financial statements that are free from material misstatement, whether due to fraud or error.
In preparing the consolidated financial statements, the directors are responsible for assessing the Group’s ability to
continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern
basis of accounting unless the directors either intend to liquidate the Group or to cease operations, or have no realistic
alternative but to do so.
The directors are responsible for overseeing the Group’s financial reporting process. The audit committee of Company (the
“Audit Committee”) assists the directors in discharging their responsibility in this regard.
AUDITOR’S RESPONSIBILITIES FOR THE AUDIT OF THE CONSOLIDATED FINANCIAL STATEMENTS
Our objectives are to obtain reasonable assurance about whether the consolidated financial statements as a whole are
free from material misstatement, whether due to fraud or error, and to issue an auditor’s report that includes our opinion
solely to you, as a body, in accordance with our agreed terms of engagement, and for no other purpose. We do not assume
responsibility towards or accept liability to any other person for the contents of this report.
INDEPENDENT AUDITOR’S REPORT
- 34 -
TO THE SHAREHOLDERS OF
CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
AUDITOR’S RESPONSIBILITIES FOR THE AUDIT OF THE CONSOLIDATED FINANCIAL STATEMENTS
(Cont’d)
Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with ISAs
will always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are considered
material if, individually or in the aggregate, they could reasonably be expected to influence the economic decisions of
users taken on the basis of these consolidated financial statements.
As part of an audit in accordance with ISAs, we exercise professional judgment and maintain professional skepticism
throughout the audit. We also:
• Identify and assess the risks of material misstatement of the consolidated financial statements, whether due to fraud
or error, design and perform audit procedures responsive to those risks, and obtain audit evidence that is sufficient
and appropriate to provide a basis for our opinion. The risk of not detecting a material misstatement resulting from
fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions,
misrepresentations, or the override of internal control.
• Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate
in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Group’s internal
control.
• Evaluate the appropriateness of accounting policies used and the reasonableness of accounting estimates and related
disclosures made by the directors.
• Conclude on the appropriateness of the directors’ use of the going concern basis of accounting and, based on the
audit evidence obtained, whether a material uncertainty exists related to events or conditions that may cast significant
doubt on the Group’s ability to continue as a going concern. If we conclude that a material uncertainty exists, we are
required to draw attention in our auditor’s report to the related disclosures in the consolidated financial statements
or, if such disclosures are inadequate, to modify our opinion. Our conclusions are based on the audit evidence
obtained up to the date of our auditor’s report. However, future events or conditions may cause the Group to cease
to continue as a going concern.
• Evaluate the overall presentation, structure and content of the consolidated financial statements, including the
disclosures, and whether the consolidated financial statements represent the underlying transactions and events in
a manner that achieves fair presentation.
• Plan and perform the group audit to obtain sufficient appropriate audit evidence regarding the financial information
of the entities or business units within the Group as a basis for forming an opinion on the group financial statements.
We are responsible for the direction, supervision and review of the audit work performed for purposes of the group
audit. We remain solely responsible for our audit opinion.
INDEPENDENT AUDITOR’S REPORT
- 35 -
TO THE SHAREHOLDERS OF
CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
AUDITOR’S RESPONSIBILITIES FOR THE AUDIT OF THE CONSOLIDATED FINANCIAL STATEMENTS
(Cont’d)
We communicate with the Audit Committee regarding, among other matters, the planned scope and timing of the audit
and significant audit findings, including any significant deficiencies in internal control that we identify during our audit.
We also provide the Audit Committee with a statement that we have complied with relevant ethical requirements regarding
independence, and to communicate with them all relationships and other matters that may reasonably be thought to bear
on our independence, and where applicable, actions taken to eliminate threats or safeguards applied.
From the matter communicated with the directors, we determine the matter that was of most significance in the audit of
the consolidated financial statements of the current period and is therefore the key audit matter. We describe this matter
in our auditor’s report unless law or regulation precludes public disclosure about the matter or when, in extremely rare
circumstances, we determine that a matter should not be communicated in our report because the adverse consequences
of doing so would reasonably be expected to outweigh the public interest benefits of such communication.
BDO Limited
Certified Public Accountants
PAK, Tak Lun, Amos
Practising Certificate no. P06170
Hong Kong,
March 30, 2026
INDEPENDENT AUDITOR’S REPORT
- 36 -
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME FOR THE YEAR ENDED DECEMBER 31, 2025
- 37 - NOTES20252024 US$’000US$’000 Revenue51,310,125756,646 Cost of sales(626,134)(569,726)
Mine operating earnings683,991186,920
Expenses General and administrative expenses6(59,934)(47,566) Exploration and evaluation expenditure(1,133)(438) Research and development expenses(32,799)(15,722)
(93,866)(63,726)
Income from operations590,125123,194
Other (expenses) income Foreign exchange loss, net(349)(2,561) Interest and other income11,7315,109 Other expenses7(22,538)(10,132) Finance costs8(18,804)(22,390)
(29,960)(29,974)
Profit before income tax560,16593,220 Income tax expense9(87,850)(27,922)
Profit for the year10472,31565,298
Other comprehensive income (expense) for the year Item that will not be reclassified to profit or loss: Fair value gain on equity instruments at fair value through other comprehensive income (“FVTOCI”)1985,4641,271 Item that may be reclassified subsequently to profit or loss: Exchange difference arising on translation of foreign operations25,993(8,422)
111,457(7,151)
Total comprehensive income for the year583,77258,147
NOTE20252024 US$’000US$’000 Profit for the year attributable to: Non-controlling interests5,3562,566 Owners of the Company466,95962,732
472,31565,298
Total comprehensive income for the year
attributable to:
Non-controlling interests5,3562,567
Owners of the Company578,41655,580
583,77258,147
Earnings per share – Basic and Dilutive (US cents)13117.8015.82
Weighted average number of common shares – Basic and Dilutive13396,413,753396,413,753
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME FOR THE YEAR ENDED DECEMBER 31, 2025
- 38 -
CONSOLIDATED STATEMENT OF FINANCIAL POSITION AT DECEMBER 31, 2025
- 39 - NOTES20252024 US$’000US$’000 Current assets Cash and cash equivalents14399,402183,779 Restricted bank balances1434,16266,698 Term deposits14305,884118,246 Trade and other receivables158,2467,393 Prepaid expenses and deposits161,7941,513 Inventories17294,536290,405
1,044,024668,034
Non-current assets Prepaid expenses and deposits167430,095 Right-of-use assets18104,51945,957 Equity instruments at FVTOCI19133,87548,411 Property, plant and equipment201,339,4471,375,498 Intangible assets21724,647752,414 Other non-current assets229,94915,570
2,312,5112,267,945
Total assets3,356,5352,935,979
Current liabilities Accounts and other payables and accrued expenses23181,828175,132 Contract liabilities2410,0638,099 Borrowings25217,004148,696 Entrusted loan payable2628,454– Lease liabilities271,417469 Tax liabilities25,2538,650
464,019341,046
NOTE20252024 US$’000US$’000 Net current assets580,005326,988
Total assets less current liabilities2,892,5162,594,933
Non-current liabilities Accounts and other payables and accrued expenses2325,41932,822 Borrowings25287,981565,656 Entrusted loan payable26–27,823 Lease liabilities2712,628459 Deferred tax liabilities9135,665112,000 Deferred income1919 Environmental rehabilitation2893,77869,948
555,490808,727
Total liabilities1,019,5091,149,773
Owners’ equity Share capital291,229,0611,229,061 Reserves266,98599,737 Retained profits813,095433,640
2,309,1411,762,438 Non-controlling interests27,88523,768
Total owners’ equity2,337,0261,786,206
Total liabilities and owners’ equity3,356,5352,935,979
The consolidated financial statements on pages 37 to 118 were approved and authorised for issue by the Board of Directors on March 30, 2026 and are signed on its behalf by:
Chenguang HouYingbin Ian He DirectorDirector CONSOLIDATED STATEMENT OF FINANCIAL POSITION AT DECEMBER 31, 2025
- 40 -
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY FOR THE YEAR ENDED DECEMBER 31, 2025
- 41 - Attributable to the owners of the Company
InvestmentsNon–Total NumberShareEquityrevaluationExchangeStatutoryRetainedcontrollingowners’ of sharescapitalreservereservereservereservesprofitsSubtotalinterestsequity US$’000US$’000US$’000US$’000US$’000US$’000US$’000US$’000US$’000 (Note) At January 1, 2024396,413,7531,229,06111,17926,318(61,875)121,800380,3751,706,85820,8831,727,741
Profit for the year––––––62,73262,7322,56665,298 Fair value gain on equity instruments at FVTOCI–––1,271–––1,271–1,271 Exchange difference arising on translation––––(8,423)––(8,423)1(8,422)
Total comprehensive income (expenses) for the year–––1,271(8,423)–62,73255,5802,56758,147 Transfer to statutory reserves – appropriation from retained profits–––––9,436(9,436)––– Transfer to reserve fund – appropriation from retained profits–––––31(31)––– Dividends paid to a non-controlling shareholder––––––––(1,250)(1,250) Other––––––––1,5681,568
At December 31, 2024396,413,7531,229,06111,17927,589(70,298)131,267433,6401,762,43823,7681,786,206
Profit for the year––––––466,959466,9595,356472,315 Fair value gain on equity instruments at FVTOCI–––85,464–––85,464–85,464 Exchange difference arising on translation––––25,993––25,993–25,993
Total comprehensive income for the year–––85,46425,993–466,959578,4165,356583,772 Transfer to statutory reserves – appropriation from retained profits–––––55,791 (55,791)––– Dividends paid to shareholders––––––(31,713)(31,713)–(31,713) Dividends paid to a non-controlling shareholder––––––––(1,239)(1,239)
At December 31, 2025396,413,7531,229,06111,179113,053(44,305)187,058 813,0952,309,14127,8852,337,026
Note: Statutory reserves which consist of (1) appropriations from the profit after taxation of the subsidiaries established in the People’s Republic
of China (“PRC”) and (2) provision of safety production fund of the subsidiaries engaged in the exploration and development in the mining
industry, form part of the equity of PRC subsidiaries. In accordance with the PRC Company Law and the Articles of Association of the PRC
subsidiaries, the PRC subsidiaries are required to appropriate an amount equal to a minimum of 10% of their profits after taxation each
year to a statutory reserve or reserve fund until the reserve reaches 50% of the registered capital of the respective subsidiaries. Pursuant
to the Caizi (2022) No.136 on implementation of entities’ safety production funds management, effective on November 21, 2022, and in
accordance with the Articles of Association of the PRC subsidiaries, the PRC subsidiaries are required to appropriate an amount, equal to
RMB5 per ton multiplied by the volume of ore mined less actual payment, each year to a statutory reserve and utilise an amount when the
actual payment is more than RMB5 per ton multiplied by the volume of ore mined.
CONSOLIDATED STATEMENT OF CASH FLOWS FOR THE YEAR ENDED DECEMBER 31, 2025
- 42 - 20252024 US$’000US$’000 Operating activities Profit before income tax560,16593,220 Items not requiring use of cash and cash equivalents: Amortisation of mining rights29,08319,906 Depreciation of property, plant and equipment131,998121,285 Depreciation of right-of-use assets4,9184,776 Interest income(8,705)(3,114) Dividend income(3,026)(2,095) Finance costs18,80422,390 Provision for impairment of: – trade and other receivables1,4342,051 – other non-current assets5,879– Write-down of inventories–291 Loss on disposal of property, plant and equipment2,369620 Unrealised foreign exchange loss, net3,9561,403
746,875260,733 Change in operating working capital items: Trade and other receivables(2,477)6,470 Inventories(4,131)226 Contract liabilities1,9647,954 Restricted bank balances32,536– Accounts and other payables and accrued expenses(707)68,414
Cash generated from operations774,060343,797 Environmental rehabilitation expense paid(692)(7,841) Interest paid(15,802)(19,538) PRC income tax paid(47,582)(9,522)
Net cash from operating activities709,984306,896
CONSOLIDATED STATEMENT OF CASH FLOWS FOR THE YEAR ENDED DECEMBER 31, 2025
- 43 - 20252024 US$’000US$’000 Investing activities Interest received8,7053,114 Dividends received from equity investment at FVTOCI3,0262,095 Payment for acquisition of mining rights–(1,226) Payment for acquisition of property, plant and equipment(50,136)(48,286) Proceeds from disposal of property, plant and equipment12– Deposits paid for water treatment project–(6,096) Payment for land use right(19,773)(11,217) Payment for deposit for acquisition of land use right–(23,906) Payment for acquisition of intangible assets(150)– Payment for right-of-use assets on or before commencement date(874)– Placement of term deposits(306,638)(133,395) Release of term deposits119,00014,042
Net cash used in investing activities(246,828)(204,875)
Financing activities Repayments of borrowings(306,219)(156,955) Proceeds from borrowings86,000142,633 Dividends paid to a non-controlling shareholder(1,239)(1,250) Dividends paid to shareholders(31,713)– Repayments of lease liabilities(514)(599)
Net cash used in financing activities(253,685)(16,171)
Net increase in cash and cash equivalents209,47185,850 Cash and cash equivalents, beginning of year183,77997,237 Effect of foreign exchange rate changes on cash and cash equivalents6,152692
Cash and cash equivalents, end of year399,402183,779
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 44 -
-
GENERAL INFORMATION 1.1 General information China Gold International Resources Corp. Ltd. (the “Company”) is a publicly listed company incorporated in
British Columbia, Canada on May 31, 2000 with limited liability under the legislation of the Province of British Columbia and its shares are listed on the Toronto Stock Exchange and The Stock Exchange of Hong Kong
Limited (the “Stock Exchange”). The Company together with its subsidiaries (collectively referred to as the
“Group”) is principally engaged in the acquisition, exploration, development and mining of mineral resources in the PRC. Particulars of the subsidiaries of the Company are set out in note 37. The Group considers that
China National Gold Group Co., Ltd. (“CNG”), a state owned company registered in Beijing, the PRC, which is controlled by State-owned Assets Supervision and Administration Commission of the State Council of the PRC, is able to exercise significant influence over the Company. The head office, principal address and registered and records office of the Company are located at Suite 1780, 400 Burrard Street, Vancouver, British Columbia, Canada, V6C 3A6. The consolidated financial statements are presented in United States Dollars (“US$”) which is also the functional currency of the Company. -
APPLICATION OF NEW AND AMENDMENTS TO IFRS ACCOUNTING STANDARDS Amendments to IFRS Accounting Standards that are mandatorily effective for the current year In the current year, the Group has applied the following amendments to IFRS Accounting Standards issued by
International Accounting Standards Board (the “IASB”) for the first time, which is mandatorily effective for the
Group’s annual period beginning on January 1, 2025 for the preparation of the consolidated financial statements: Amendments to IAS 21Lack of Exchangeability As the currencies that the Group had transacted in and the functional currencies of overseas entities for translation into the Group’s presentation currency were exchangeable, the application of the amendments to IFRS Accounting Standards in the current year has had no impact on the Group’s financial positions and performance for the current and prior years and/or on the disclosures set out in these consolidated financial statements. -
APPLICATION OF NEW AND AMENDMENTS TO IFRS ACCOUNTING STANDARDS (Cont’d) New and amendments to IFRS Accounting Standards in issue but not yet effective The Group has not early applied the following new and amendments to IFRS Accounting Standards that have been issued but are not yet effective: Amendments to IFRS 9Amendments to the Classification and Measurement of and IFRS 7 Financial Instruments 2 Amendments to IFRS 9Contracts Referencing Nature – dependent Electricity 2 and IFRS 7 Amendments to IFRS 10Sale or Contribution of Assets between an Investor and IAS 28 and its Associate or Joint Venture 1 IFRS 18Presentation and Disclosure in Financial Statement 3 IFRS 19 and its amendmentsSubsidiaries without Public Accountability: Disclosure 3 Amendments to IAS 21Translation to a Hyperinflationary Presentation Currency 3 Amendments to IFRS AccountingAnnual Improvement to IFRS Accounting Standards Standards – Volume 11 2 1 No mandatory effective date yet determined but available for adoption 2 Effective for annual periods beginning on or after January 1, 2026 3 Effective for annual periods beginning on or after January 1, 2027 Except for the new IFRS Accounting Standard mentioned below, the directors of the Company anticipate that
the application of other new and amendments to IFRS Accounting Standards will have no material impact on the
consolidated financial statements in the foreseeable future. IFRS 18 Presentation and Disclosure in Financial Statements IFRS 18 Presentation and Disclosure in Financial Statements, which sets out requirements on presentation and
disclosures in financial statements, will replace IAS 1 Presentation of Financial Statements. This new IFRS Accounting Standard, while carrying forward many of the requirements in IAS 1, introduces new requirements to present specified categories and defined subtotals in the statement of profit or loss; provide disclosures on management-defined
performance measures in the notes to the financial statements and improve aggregation and disaggregation of
information to be disclosed in the financial statements. In addition, some IAS 1 paragraphs have been moved to IAS 8 Accounting Policies, Changes in Accounting Estimates and Errors and IFRS 7 Financial Instruments: Disclosures. Minor amendments to IAS 7 Statement of Cash Flows and IAS 33 Earnings per Share are also made. IFRS 18, and amendments to other standards, will be effective for annual periods beginning on or after 1 January 2027, with early application permitted. The application of the new standard is expected to affect the presentation
of the statement of profit or loss and disclosures in the future financial statements. The Group is in the process of assessing the detailed impact of IFRS 18 on the Group’s consolidated financial statements. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 45 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION Basis of preparation of consolidated financial statements The consolidated financial statements have been prepared in accordance with IFRS Accounting Standards issued by the IASB. For the purpose of preparation of the consolidated financial statements, information is considered material if such information is reasonably expected to influence decisions made by primary users. In addition, the consolidated financial statements include applicable disclosures required by the Rules Governing the Listing of Securities on the Stock Exchange (“Listing Rules”) and by the Hong Kong Companies Ordinance (“Co”). The directors of the Company have, at the time of approving the consolidated financial statements, a reasonable
expectation that the Group has adequate resources to continue in operational existence for the foreseeable future. Thus they continue to adopt the going concern basis of accounting in preparing the consolidated financial statements. Material accounting policy information Basis of consolidation The consolidated financial statements incorporate the financial statements of the Company and entities controlled
by the Company and its subsidiaries. Control is achieved when the Company: • has power over the investee; • is exposed, or has rights, to variable returns from its involvement with the investee; and • has the ability to use its power to affect its returns. The Group reassesses whether or not it controls an investee if facts and circumstances indicate that there are changes to one or more of the three elements of control listed above. Consolidation of a subsidiary begins when the Group obtains control over the subsidiary and ceases when the Group loses control of the subsidiary. Profit or loss and each item of other comprehensive income are attributed to the owners of the Company and to the non-controlling interests. Total comprehensive income of subsidiaries is attributed to the owners of the Company and to the non-controlling interests even if this results in the non-controlling interests having a deficit balance. When necessary, adjustments are made to the financial statements of subsidiaries to bring their accounting policies in line with the Group’s accounting policies. All intragroup assets and liabilities, equity, income, expenses and cash flows relating to transactions between members of the Group are eliminated in full on consolidation. Non-controlling interests in subsidiaries are presented separately from the Group’s equity therein, which represent present ownership interests entitling their holders to a proportionate share of net assets of the relevant subsidiaries upon liquidation. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 46 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Revenue from contracts with customers The Group recognises revenue when (or as) a performance obligation is satisfied, i.e. when “control” of the goods or services underlying the particular performance obligation is transferred to the customer. A performance obligation represents a good or service (or a bundle of goods or services) that is distinct or a series of distinct goods or services that are substantially the same. Control is transferred over time and revenue is recognised over time by reference to the progress towards complete satisfaction of the relevant performance obligation if one of the following criteria is met: • the customer simultaneously receives and consumes the benefits provided by the Group’s performance as the Group performs; • the Group’s performance creates or enhances an asset that the customer controls as the Group performs; or • the Group’s performance does not create an asset with an alternative use to the Group and the Group has an enforceable right to payment for performance completed to date. Otherwise, revenue is recognised at a point in time when the customer obtains control of the distinct good or service. A contract asset represents the Group’s right to consideration in exchange for goods or services that the Group has transferred to a customer that is not yet unconditional. It is assessed for impairment in accordance with IFRS 9
Financial Instruments. In contrast, a receivable represents the Group’s unconditional right to consideration, i.e. only the passage of time is required before payment of that consideration is due. A contract liability represents the Group’s obligation to transfer goods or services to a customer for which the Group has received consideration (or an amount of consideration is due) from the customer. A contract asset and a contract liability relating to the same contract are accounted for and presented on a net basis. For contracts where the period between payment and transfer of the associated goods or services is less than one year, the Group applies the practical expedient for not adjusting the transaction price for any significant financing
component. Revenue is recognised at a point in time when control of the gold doré bars, copper and other by-products is passed to customers, i.e. when the products are delivered and titles have passed to customers. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 47 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Leases The Group assesses whether a contract is or contains a lease based on the definition under IFRS 16 at inception of the contract. Such contract will not be reassessed unless the terms and conditions of the contract are subsequently changed. The Group as a lessee Right-of-use assets The cost of right-of-use asset includes: • the amount of the initial measurement of the lease liability; • any lease payments made at or before the commencement date, less any lease incentives received; • any initial direct costs incurred by the Group; and • an estimate of costs to be incurred by the Group in dismantling and removing the underlying assets, restoring the site on which it is located or restoring the underlying asset to the condition required by the terms and
conditions of the lease. Right-of-use assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any remeasurement of lease liabilities. Right-of-use assets in which the Group is reasonably certain to obtain ownership of the underlying leased assets at the end of the lease term are depreciated from commencement date to the end of the useful life. Otherwise, right- of-use assets are depreciated on a straight-line basis over the shorter of its estimated useful life and the lease term. The Group presents right-of-use assets as a separate line item on the consolidated statement of financial position. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 48 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Foreign currencies In preparing the financial statements of each individual group entity, transactions in currencies other than the
functional currency of that entity (foreign currencies) are recognised at the rates of exchanges prevailing on the
dates of the transactions. At the end of the reporting period, monetary items denominated in foreign currencies are retranslated at the rates prevailing at that date. Non-monetary items carried at fair value that are denominated in
foreign currencies are retranslated at the rates prevailing on the date when the fair value was determined. When a fair value gain or loss on a non-monetary item is recognised in profit or loss, any exchange component of that gain or loss is also recognised in profit or loss. When a fair value gain or loss on a non-monetary item is recognised in
other comprehensive income, any exchange component of that gain or loss is also recognised in other comprehensive income. Non-monetary items that are measured in terms of historical cost in a foreign currency are not retranslated. Exchange differences arising on the settlement of monetary items, and on the retranslation of monetary items, are recognised in profit or loss in the period in which they arise. For the purposes of presenting the consolidated financial statements, the assets and liabilities of the Group’s operations are translated into the presentation currency of the Group (i.e. US$) using exchange rates prevailing at the end
of each reporting period. Income and expenses items are translated at the average exchange rates for the period.
Exchange differences arising, if any, are recognised in other comprehensive income and accumulated in equity under the heading of exchange reserve (attributed to non-controlling interests as appropriate). Borrowing costs Borrowing costs directly attributable to the acquisition, construction or production of qualifying assets, which are
assets that necessarily take a substantial period of time to get ready for their intended use or sale, are added to the cost of those assets until such time as the assets are substantially ready for their intended use or sale. All other borrowing costs are recognised in profit or loss in the period in which they are incurred. Taxation Income tax expense represents the sum of current and deferred income tax expense. The tax currently payable is based on taxable profit for the year. Taxable profit differs from profit/(loss) before income tax because of income or expense that are taxable or deductible in other years and items that are never taxable or deductible. The Group’s liability for current tax is calculated using tax rates that have been enacted or substantively enacted by the end of the reporting period. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 49 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Taxation (Cont’d) Deferred tax is recognised on temporary differences between the carrying amounts of assets and liabilities in
the consolidated financial statements and the corresponding tax bases used in the computation of taxable profit.
Deferred tax liabilities are generally recognised for all taxable temporary differences. Deferred tax assets are generally recognised for all deductible temporary differences to the extent that it is probable that taxable profits will be available against which those deductible temporary differences can be utilised. Such deferred tax assets and liabilities are not recognised if the temporary difference arises from the initial recognition (other than in a business combination) of
assets and liabilities in a transaction that affects neither the taxable profit nor the accounting profit and at the time of the transaction does not give rise to equal taxable and deductible temporary differences. Deferred tax liabilities are recognised for taxable temporary differences associated with investments in subsidiaries, except where the Group is able to control the reversal of the temporary difference and it is probable that the temporary difference will not reverse in the foreseeable future. Deferred tax assets arising from deductible temporary differences associated with such investments are only recognised to the extent that it is probable that there will be sufficient
taxable profits against which to utilise the benefits of the temporary differences and they are expected to reverse in the foreseeable future. The carrying amount of deferred tax assets is reviewed at the end of each reporting period and reduced to the
extent that it is no longer probable that sufficient taxable profits will be available to allow all or part of the asset to be recovered. Deferred tax assets and liabilities are measured at the tax rates that are expected to apply in the period in which the liability is settled or the asset is realised, based on tax rate (and tax laws) that have been enacted or substantively enacted by the end of the reporting period. The measurement of deferred tax liabilities and assets reflects the tax consequences that would follow from the
manner in which the Group expects, at the end of the reporting period, to recover or settle the carrying amount of its assets and liabilities. For ultimate costs incurred for provisions for environmental rehabilitation, the Group applies IAS 12 requirements to the provisions for environmental rehabilitation and the related assets separately. The Group recognises a deferred
tax asset related to provisions for environmental rehabilitation to the extent that it is probable that taxable profit will be available against which the deductible temporary difference can be utilised and a deferred tax liability for all
taxable temporary differences. Deferred tax assets and liabilities are offset when there is a legally enforceable right to set off current tax assets
against current tax liabilities and when they relate to income taxes levied to the same taxable entity by the same
taxation authority. Current and deferred tax are recognised in profit or loss. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 50 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Cash and cash equivalents Cash and cash equivalents presented on the consolidated statement of financial position comprises of cash on hand and demand deposits. Inventories Inventories are stated at the lower of cost and net realisable value. Costs of inventories are determined using the
weighted average cost method. Net realisable value is the estimated selling price in the ordinary course of business less the estimated costs of completion and the estimated costs necessary to make the sale. Costs necessary to make the sale include incremental costs directly attributable to the sale and non-incremental costs which the Group must incur to make the sale. Gold in process inventory Gold in process inventory consists of gold contained in the ore on leach pads and in-circuit material within processing operations. Production costs are capitalised and included in gold in process inventory based on the current mining and processing cost incurred up to the point prior to the refining process including the cost of raw materials and direct labour;
mine-site overhead expenses; stripping costs; and allocated indirect costs, including depreciation and depletion of mining interests. Gold doré bars inventory Gold doré bar is gold awaiting refinement and gold refined and ready for sales. The recovery of gold from ore is
achieved through a heap leaching process. Under this method, ore is placed on leach pads where it is treated with a chemical solution which dissolves the gold contained in the ore. The resulting “pregnant” solution is further processed in a plant where the gold is recovered. Costs are subsequently recycled from ore on leach pads as ounces of gold are recovered based on the average cost per recoverable ounce on the leach pad. Estimates of recoverable gold on the leach pads are calculated from the quantities of ore placed on the leach pads (measured in tonnes added to
the leach pads), the grade of the ore placed on the leach pads (based on assay data), and a recovery percentage (based on ore type). Others Copper inventory is copper and other by-products after metallurgical processing and ready for sales. Consumables used in operations, such as fuel, chemicals, and reagents and spare parts inventory are valued at the lower of cost or net realisable value. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 51 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Inventories (Cont’d) Provisions Provisions are recognised when the Group has a present obligation (legal or constructive) as a result of a past event, it is probable that the Group will be required to settle that obligation, and a reliable estimate can be made of the
amount of the obligation. The amount recognised as a provision is the best estimate of the consideration required to settle the present obligation at the end of the reporting period, taking into account the risks and uncertainties surrounding the obligation. When a provision is measured using the cash flows estimated to settle the present obligation, its carrying amount is the
present value of those cash flows (where the effect of the time value of money is material). Contingent liabilities A contingent liability is a present obligation arising from past events but is not recognised because it is not probable that an outflow of resources embodying economic benefits will be required to settle the obligation. Where the Group is jointly and severally liable for an obligation, the part of the obligation that is expected to be met by other parties is treated as a contingent liability and it is not recognised in the consolidated financial statements. The Group assesses continually to determine whether an outflow of resources embodying economic benefits has
become probable. If it becomes probable that an outflow of future economic benefits will be required for an item
previously dealt with as a contingent liability, a provision is recognised in the consolidated financial statements in
the reporting period in which the change in probability occurs, except in the extremely rare circumstances where
no reliable estimate can be made. Environmental rehabilitation An obligation to incur restoration, rehabilitation and environmental costs arises when environmental disturbance is caused by the development or ongoing production of a mining property. Such costs arising from the decommissioning of plant and other site preparation work, discounted to their net present value, are provided for and capitalised as part of the related property, plant and equipment at the start of each project, as soon as the obligation to incur such costs arises. These costs are recognised in profit or loss over the life of the operation, through depreciation of the asset. Costs for restoration of subsequent site damage which is created on an ongoing basis during production are recognised in profit or loss. Changes in the measurement of a liability relating to the decommissioning of plant or other site preparation work
that result from changes in the estimated timing or amount of the cash flow, including the effects of inflation and
movements in foreign exchange rates, revisions to estimated reserves, resources and lives of operations, or a change in the discount rate, are added to, or deducted from, the cost of the related asset in the period it occurred. The
periodic unwinding of discount is recognised in profit or loss as a finance cost as it occurs. If a decrease in the
liability exceeds the carrying amount of the asset, the excess is recognised immediately in profit or loss. If the asset value is increased and there is an indication that the revised carrying value is not recoverable, an impairment test is performed in accordance with the Group’s accounting policy. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 52 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Property, plant and equipment Property, plant and equipment are tangible assets that are held for use in the production or supply of goods or
services, or for administrative purposes (other than construction in progress as described below). Property, plant
and equipment are stated in the consolidated statement of financial position at cost less subsequent accumulated depreciation and subsequent accumulated impairment losses, if any. Depreciation is recognised so as to write off the cost of assets other than properties under construction less their
residual values over their estimated useful lives, using the straight-line method. The estimated useful lives, residual values and depreciation method are reviewed at the end of each reporting period, with the effect of any changes in estimate accounted for on a prospective basis. Assets under construction in progress are carried at cost, less any recognised impairment loss. Costs include any costs directly attributable to bringing the asset to the location and condition necessary for it to be capable of operating in the manner intended by management, including costs of testing whether the related assets is functioning properly and, for qualifying assets, borrowing costs capitalised in accordance with the Group’s accounting policy. Depreciation of these assets, on the same basis as other property assets, commences when the assets are ready for their intended use. When the Group makes payments for ownership interests of properties which includes both leasehold land and building elements, the entire consideration is allocated between the leasehold land and the building elements in proportion to the relative fair values at initial recognition. To the extent the allocation of the relevant payments can be made
reliably, interest in leasehold land is presented as “right-of-use assets” in the consolidated statement of financial
position. When the consideration cannot be allocated reliably between non-lease building element and undivided
interest in the underlying leasehold land, the entire properties are classified as property, plant and equipment. An item of property, plant and equipment is derecognised upon disposal or when no future economic benefits are expected to arise from the continued use of the asset. Any gain or loss arising on the disposal or retirement of an item of property, plant and equipment is determined as the difference between the sales proceeds and the carrying amount of the asset and is recognised in profit or loss. Exploration and evaluation expenditure Drilling and related costs incurred on sites without an existing mine and on areas outside the boundary of a known mineral deposit which contains proven and probable reserves are exploration and evaluation expenditure and are
expensed as incurred up to the date on which costs incurred are economically recoverable. Further exploration and evaluation expenditures, subsequent to the establishment of economic recoverability, are capitalised and included
in the carrying amount of the mineral assets. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 53 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Property, plant and equipment (Cont’d) Exploration and evaluation expenditure (Cont’d) The Management evaluates the following criteria in its assessment of economic recoverability and probability of
future economic benefit: • Geology – whether or not there is sufficient geologic and economic certainty of being able to convert a residual mineral deposit into a proven and probable reserve at a development stage or production stage mine, based on the known geology and metallurgy. A history of conversion of resources to reserves at operating mines is
used to support the likelihood of conversion. • Scoping – there is a scoping study or preliminary feasibility study that demonstrates the additional resources will generate a positive commercial outcome. Known metallurgy provides a basis for concluding there is a
significant likelihood of being able to recoup the incremental costs of extraction and production. • Accessible facilities – mining property can be processed economically at accessible mining and processing
facilities where applicable. • Life of mine plans – an overall life of mine plan and economic model to support the mine and the economic extraction of resources/reserves exists. A long-term life of mine plan, and supporting geological model identifies the drilling and related development work required to expand or further define the existing orebody. • Authorizations – operating permits and feasible environmental programs exist or are obtainable. Therefore prior to capitalising exploration drilling and related costs, the Management determines that the following conditions have been met that will contribute to future cash flows: • There is a probable future benefit that will contribute to future cash inflows; • The Group can obtain the benefit and controls access to it; • The transaction or event giving rise to the future benefit has already occurred; and • Costs incurred can be measured reliably. Development expenditure Drilling and related costs incurred to define and delineate a mineral deposit are capitalised as part of mineral assets in the period incurred, when the Management determines that there is sufficient evidence that the expenditure will result in a probable future economic benefit to the Group. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 54 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Property, plant and equipment (Cont’d) Production expenditure A mine that is under construction is determined to enter the production stage when the project is in the position and condition necessary for it to be capable of operating in the manner intended by the Management. Therefore, such costs incurred are capitalised as part of the mineral assets. Mine development costs incurred to maintain current production are included in cost of inventories. For those areas being developed which will be mined in future periods, the costs incurred are capitalised and depleted when the
related mining area is mined. Depreciation Mineral assets are depreciated using the unit-of-production method based on the actual production volume over the estimated total recoverable ounces contained in proven and probable reserves at the related mine when the mine is capable of operating as intended by the Management. The Management reviews the estimated total recoverable ounces contained in proven and probable reserves at the end of each reporting period and when events and circumstances indicate that such a review should be made. Changes to estimated total recoverable ounces contained in proven and probable reserves are accounted for prospectively. Assets under construction are not depreciated until they are substantially complete and available for their intended use. Leasehold improvements are depreciated over the shorter of the lease term and the estimated useful lives of the assets. Mining rights Mining rights are amortised using the unit-of-production method based on the actual production volume over the
estimated total recoverable ounces contained in proven and probable reserves at the related mine. Mining rights acquired in a business combination Mining rights acquired in a business combination are recognised separately from goodwill and are initially recognised at their fair value at the acquisition date (which is regarded as their cost). Subsequent to initial recognition, mining rights with finite useful lives are carried at costs less accumulated amortisation and any accumulated impairment losses. Amortisation is provided using the unit-of-production method based on the actual production volume over the estimated total proven and probable reserves of the ore mines. Variable payments for acquiring mining rights that are not part of a business combination Variable payments that are dependent on the Group’s future activity (including payments based on sales, revenues or outputs produced) are recognised in profit or loss in the period in which they arise. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 55 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Other non-current assets The right to receive a block of buildings and twenty car parks included under “other non-current assets” is carried at cost less accumulated impairment, if any. Impairment of property, plant and equipment, right-of-use assets, mining rights and other non-current assets At the end of the reporting period, the Group reviews the carrying amounts of its property, plant and equipment,
right-of-use assets, mining rights and other non-current assets to determine whether there is any indication that
those assets have suffered an impairment loss. If any such indication exists, the recoverable amount of the relevant asset is estimated in order to determine the extent of the impairment loss, if any. The recoverable amounts of property, plant and equipment, right-of-use assets, mining rights and other non-current assets are estimated individually. When it is not possible to estimate the recoverable amount individually, the Group estimates the recoverable amount of the cash-generating unit (“CGU”) to which the asset belongs. In testing a
CGU for impairment, corporate assets are allocated to the relevant CGU when a reasonable and consistent basis of allocation can be established, or otherwise they are allocated to the smallest group of CGUs for which a reasonable and consistent allocation basis can be established. The recoverable amount is determined for the CGU or group
of CGUs to which the corporate asset belongs, and is compared with the carrying amount of the relevant CGU or
group of CGUs. Recoverable amount is the higher of fair value less costs of disposal and value in use (“VIU”). In assessing VIU, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the asset (or a CGU) for which the estimates of future cash flows have not been adjusted. If the recoverable amount of an asset (or a CGU) is estimated to be less than its carrying amount, the carrying
amount of the asset (or a CGU) is reduced to its recoverable amount. For corporate assets or portion of corporate assets which cannot be allocated on a reasonable and consistent basis to a CGU, the Group compares the carrying amount of a group of CGUs, including the carrying amounts of the corporate assets or portion of corporate assets
allocated to that group of CGUs, with the recoverable amount of the group of CGUs. In allocating the impairment loss, the impairment loss is allocated first to reduce the carrying amount of any goodwill (if applicable) and then to the
other assets on a pro-rata basis based on the carrying amount of each asset in the unit or the group of CGUs. The carrying amount of an asset is not reduced below the highest of its fair value less costs of disposal (if measurable), its VIU (if determinable) and zero. The amount of the impairment loss that would otherwise have been allocated to the asset is allocated pro rata to the other assets of the unit or the group of CGUs. An impairment loss is recognised immediately in profit or loss. Where an impairment loss subsequently reverses, the carrying amount of the asset (or a CGU or a group of CGUs) is increased to the revised estimate of its recoverable amount, but so that the increased carrying amount does not exceed the carrying amount that would have been determined had no impairment loss been recognised for the asset (or a CGU or a group of CGUs) in prior years. A reversal of an impairment loss is recognised immediately in profit or loss. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 56 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Research and development expenses Expenditure on research activities is recognised as an expense in the period in which it is incurred. Development
expenditure that is not recognised as an internally-generated intangible asset is recognised in profit or loss in the
period in which it is incurred. Financial instruments Financial assets and financial liabilities are initially measured at fair value except for trade receivables arising from contracts with customers which are initially measured in accordance with IFRS 15. Transaction costs that are directly attributable to the acquisition or issue of financial assets and financial liabilities (other than financial assets or financial liabilities at fair value through profit or loss (“FVTPL”)) are added to or deducted from the fair value of financial assets or financial liabilities, as appropriate, on initial recognition. Transaction costs directly attributable to the acquisition of financial assets or financial liabilities at FVTPL are recognised immediately in profit or loss. The effective interest method is a method of calculating the amortised cost of a financial asset or financial liability and of allocating interest income and interest expense over the relevant period. The effective interest rate is the rate that exactly discounts estimated future cash receipts and payments (including all fees and points paid or received that form an integral part of the effective interest rate, transaction costs and other premiums or discounts) through the expected life of the financial asset or financial liability, or, where appropriate, a shorter period, to the net carrying amount on initial recognition. Financial assets Classification and subsequent measurement of financial assets Financial assets that meet the following conditions are subsequently measured at amortised cost: • the financial asset is held within a business model whose objective is to collect contractual cash flows; and • the contractual terms give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding. Debt instruments that meet the following conditions are subsequently measured at FVTOCI: • the financial asset is held within a business model whose objective is achieved by both collecting contractual cash flows and selling the financial assets; and • the contractual terms give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 57 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Financial instruments (Cont’d) Financial assets (Cont’d) Classification and subsequent measurement of financial assets (Cont’d) All other financial assets are subsequently measured at FVTPL, except that at initial recognition of a financial
asset the Group may irrevocably elect to present subsequent changes in fair value of an equity investment in other comprehensive income if that equity investment is neither held for trading nor contingent consideration recognised by an acquirer in a business combination to which IFRS 3 Business Combinations applies. In addition, the Group may irrevocably designate a financial asset that is required to be measured at the amortised cost or FVTOCI as measured at FVTPL if doing so eliminates or significantly reduces an accounting mismatch. Equity instruments designated as at FVTOCI Investments in equity instruments at FVTOCI are subsequently measured at fair value with gains and losses arising from changes in fair value recognised in other comprehensive income and accumulated in the investments revaluation reserve; and are not subject to impairment assessment. The cumulative gain or loss will not be reclassified to profit or loss on disposal of the equity investments, and will be transferred to retained profits. Dividends from these investments in equity instruments are recognised in profit or loss when the Group’s right to
receive the dividends is established, unless the dividends clearly represent a recovery of part of the cost of the
investment. Dividends are included in the “interest and other income” line item in profit or loss. Impairment of financial assets subject to impairment assessment under IFRS 9 The Group performs impairment assessment under expected credit loss (“ECL”) model on financial assets (including trade receivables, other receivables, amounts due from related companies, term deposits, cash and cash equivalents and restricted balances) which are subject to impairment assessment under IFRS 9. The amount of ECL is updated at each reporting date to reflect changes in credit risk since initial recognition. Simplified approach For trade receivables that do not contain a significant financing component, the Group applies simplified approach in calculating ECLs. Under the simplified approach, the Group does not track changes in credit risk, but instead
recognises a loss allowance based on lifetime ECLs at each reporting date. Lifetime ECL represents the ECL that will result from all possible default events over the expected life of the relevant instrument. In contrast, 12-month ECL (“12m ECL”) represents the portion of lifetime ECL that is expected to result from default events that are possible within 12 months after the reporting date. Assessments are done based on
the Group’s historical credit loss experience, adjusted for factors that are specific to the debtors, general economic conditions and an assessment of both the current conditions at the reporting date as well as the forecast of future conditions. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 58 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Financial instruments (Cont’d) Financial assets (Cont’d) Impairment of financial assets subject to impairment assessment under IFRS 9 (Cont’d) Other than trade receivables, at each reporting date, the Group assesses whether the credit risk on a financial
instrument has increased significantly since initial recognition. When making the assessment, the Group compares the risk of a default occurring on the financial instrument as at the reporting date with the risk of a default occurring on the financial instrument as at the date of initial recognition and considers reasonable and supportable information that is available without undue cost or effort, including historical and forward-looking information. The Group considers that there has been a significant increase in credit risk when contractual payments are more than 30 days past due. The Group considers a financial asset in default when contractual payments are 90 days past due. However, in
certain cases, the Group may also consider a financial asset to be in default when internal or external information indicates that the Group is unlikely to receive the outstanding contractual amounts in full before taking into account any credit enhancements held by the Group. A financial asset is written off when there is no reasonable expectation of recovering the contractual cash flows. The measurement of ECL is a function of the probability of default, loss given default (i.e. the magnitude of the loss if there is a default) and the exposure at default. The assessment of the probability of default and loss given default is based on historical data and forward-looking information. Estimation of ECL reflects an unbiased and probability- weighted amount that is determined with the respective risks of default occurring as the weights. Generally, the ECL is the difference between all contractual cash flows that are due to the Group in accordance with the contract and the cash flows that the Group expects to receive, discounted at the effective interest rate determined at initial recognition. The Group recognises an impairment gain or loss in profit or loss for all financial instruments by adjusting their
carrying amount, with the exception of trade receivables where the corresponding adjustment is recognised through a loss allowance account. Foreign exchange gains and losses The carrying amount of financial assets that are denominated in a foreign currency is determined in that foreign
currency and translated at the spot rate at the end of each reporting period. Specifically: • For financial assets measured at amortised cost, exchange differences are recognised in profit or loss in the
“foreign exchange loss, net” line item in profit or loss; • For equity instruments measured at FVTOCI, exchange differences are recognised in other comprehensive
income in the investments revaluation reserve. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 59 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Financial instruments (Cont’d) Financial assets (Cont’d) Derecognition of financial assets The Group derecognises a financial asset only when the contractual rights to the cash flows from the asset expire, or when it transfers the financial asset and substantially all the risks and rewards of ownership of the asset to another entity. On derecognition of a financial asset measured at amortised cost, the difference between the asset’s carrying amount and the sum of the consideration received and receivable is recognised in profit or loss. On derecognition of an investment in equity instrument which the Group has elected on initial recognition to measure at FVTOCI, the cumulative gain or loss previously accumulated in the investments revaluation reserve is not reclassified to profit or loss, but is transferred to retained profits. Financial liabilities and equity instruments Classification as debt or equity Debt and equity instruments issued by a group entity are classified as either financial liabilities or as equity in
accordance with the substance of the contractual arrangements and the definitions of a financial liability and an
equity instrument. Equity instruments An equity instrument is any contract that evidences a residual interest in the assets of an entity after deducting all of its liabilities. Equity instruments issued by the Company are recognised at the proceeds received, net of direct
issue costs. Financial liabilities at amortised cost Financial liabilities including borrowings, entrusted loan payable, accounts and other payables are initially measured at fair value, net of transaction costs, and are subsequently measured at amortised cost using the effective interest method. Foreign exchange gains and losses For financial liabilities that are denominated in a foreign currency and are measured at amortised cost at the end
of each reporting period, the foreign exchange gains and losses are determined based on the amortised cost of the instruments. These foreign exchange gains and losses are recognised in the “foreign exchange loss, net” line item in profit or loss. Derecognition of financial liabilities The Group derecognises financial liabilities when, and only when, the Group’s obligations are discharged, cancelled or have expired. The difference between the carrying amount of the financial liability derecognised and the consideration paid and payable is recognised in profit or loss. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 60 -
- CRITICAL ACCOUNTING JUDGEMENT AND KEY SOURCES OF ESTIMATION UNCERTAINTY
In the application of the Group’s accounting policies, the directors of the Company are required to make judgements,
estimates and assumptions about the carrying amounts of assets and liabilities that are not readily apparent from
other sources. The estimates and underlying assumptions are based on historical experience and other factors that are considered to be relevant. Actual results may differ from these estimates. The estimates and underlying assumptions are reviewed on an on-going basis. Revisions to accounting estimates
are recognised in the period in which the estimate is revised if the revision affects only that period, or in the period of the revision and future periods if the revision affects both current and future periods. Key sources of estimation uncertainty The following are the key assumptions concerning the future, and other key sources of estimation uncertainty at the end of the reporting period that may have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year. (a) Impairment of non-financial assets In determining whether an asset is impaired or the event previously causing the impairment no longer exists, the Group has to exercise judgement in the area of asset impairment, particularly in assessing: (i) whether an event has occurred that may affect the asset value or such event affecting the asset value
has not been in existence; (ii) whether the carrying value of an asset or a CGU can be supported by the recoverable amount of the CGU, which is the higher of fair value less costs of disposal and value-in- use of the CGU. The value-in-use
calculation is based on the net present value of future cash flows which are estimated based upon the continued use of the asset or CGU, or derecognition; and (iii) the appropriate key assumptions to be applied in preparing cash flow projections including whether
these cash flow projections are discounted using an appropriate rate. Changing the assumptions selected by management to determine the level of impairment, including the discount rates or the growth rate
assumptions in the cash flow projections, could materially affect the net present value used in the
impairment test. (b) Inventories The Group records the cost of gold mining ore placed on its leach pads and in process at its mine as gold in process inventory, and values gold in process inventory at the lower of cost and estimated net realisable value. The assumptions used in the valuation of gold in process inventories include estimates of gold contained in the ore placed on leach pads, and the amount of gold that is expected to be recovered from the ore placed on leach pads. If these estimates or assumptions are proven inaccurate, the Group could be required to write down the recorded value of its gold in process inventories. During the year, there is no change in the relevant estimation. Although the quantities of recoverable gold placed on the leach pad and the processing plant are reconciled by comparing the grades of ore placed on the leach pad to the quantities actually recovered, the nature of the leaching process inherently limits the ability to precisely monitor inventory levels. The actual recovery of gold from the leach pad is not known until the leaching process has concluded at the end of the mine life. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 61 -
- CRITICAL ACCOUNTING JUDGEMENT AND KEY SOURCES OF ESTIMATION UNCERTAINTY
(Cont’d) Key sources of estimation uncertainty (Cont’d) (b) Inventories (Cont’d) The Management periodically reassesses the assumptions used in the valuation of gold in process, particularly the estimated recovery rate to calculate the amount of gold that is expected to be recovered from the ore placed on leach pads (the “Estimated Recovery Rate”). As of December 31, 2025, the Group applies an Estimated
Recovery Rate derived from metallurgical recovery assumptions disclosed in the NI 43-101 technical report
and adjusted, where appropriate, based on current operating conditions and historical performance. An increase/decrease in the Estimated Recovery Rate by ±3 percentage points would lead to a decrease/ increase in the average production cost of gold doré bars by US$11.7 million. During the year, there is no
change in the relevant estimation. The carrying amounts of gold in process and gold doré bars as at December 31, 2025 and 2024 are disclosed in note 17. (c) Contingency The Group is involved in a legal proceeding with an independent mine construction contractor of Huatailong and has applied judgement on whether it is probable that an outflow of economic benefits will be required by taking into account the new evidences and materials collected and the legal advice. Disclosures has been set out in note 31(iii) and no related provision has been made as of December 31, 2025. (d) Depreciation and amortisation of mining related assets and reserves estimates As explained in note 3, mineral assets and mining rights are depreciated and amortised using the units of
production method based on the proved and probable mineral reserves. Engineering estimates of the Group’s mineral reserves are inherently imprecise and represent only approximate amounts because of the subjective judgements involved in developing such information. There is a national
standard set by the PRC Government regarding the engineering criteria that have to be met before estimated mineral reserves can be designated as “proved and probable”. Proved and probable mineral reserve estimates are updated at regular basis and have taken into account recent production and technical information about each mine. In addition, as prices and cost levels change from year to year, the estimate of proved and probable gold reserves also changes. This change is considered a change in estimate for accounting purposes and is
reflected on a prospective basis in related depreciation rates. Despite the inherent imprecision in these engineering estimates, these estimates are used in determining
depreciation and amortisation expenses. Depreciation rates are determined based on estimated proved and
probable gold reserve quantity (the denominator) and capitalised costs of mineral assets and mining rights
(the numerator). The capitalised cost of mineral assets and mining rights are amortised based on the units of gold equivalent metal volume produced. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 62 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 63 -
- REVENUE AND SEGMENT INFORMATION Revenue (i) Disaggregation of revenue from contracts with customers The following is an analysis of the Group’s revenue from its major products and service: 20252024 US$’000US$’000 At a point in time Gold doré bars338,473246,946 Copper495,555283,224 Other by-products and service (note)476,098226,476
Total revenue1,310,125756,646
Note: Other by-products mainly consist of molybdenum, silver, lead and zinc. Other services consist of transportation services, which
contribute to less than 1% (2024: less than 1%) of total revenue of the Group during the year ended December 31, 2025.
(ii) Performance obligations for contracts with customers
The Group sells gold doré bars, copper and other by-products directly to customers. Revenue is recognised
at a point in time when control of the gold doré bars, copper and other by-products is passed to customers,
i.e. when the products are delivered and titles have passed to customers. A contract liability represents the
Group’s obligation to transfer goods or services to a customer for which the Group has received consideration
(or an amount of consideration is due) from the customer.
All sales of gold doré bars, copper and other by-products are for periods of one year or less. As permitted under
IFRS 15, the transaction price allocated to these unsatisfied contracts is not disclosed.
- REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information
IFRS 8 Operating Segment requires operating segments to be identified on the basis of internal reports that are
regularly reviewed by the chief operating decision-maker (“CODM”) to allocate resources to the segments and to
assess their performance. The CODM, who is responsible for allocating resources and assessing performance of the operating segments, has been defined as the executive directors of the Company. The CODM has identified two operating and reportable
segments as follows: (i) The mine-produced gold segment – the production of gold doré bars through the Group’s integrated processes, i.e., mining, metallurgical processing, production and selling of gold doré bars to external clients. (ii) The mine-produced copper concentrate segment – the production of copper concentrate including other by- products through the Group’s integrated processes, i.e., mining, metallurgical processing, production and selling copper concentrate including other by-products to external clients. Information regarding the above segments is reported below. (a) Segment revenue and results The following is an analysis of the Group’s revenue and results by operating and reportable segment: For the year ended December 31, 2025 Mine – Mine –produced producedcopperSegment goldconcentratetotalUnallocatedConsolidated US$’000US$’000US$’000US$’000US$’000 Revenue – external and segment revenue338,473971,6521,310,125–1,310,125 Cost of sales(164,876)(461,258)(626,134)–(626,134)
Mining operating earnings173,597510,394683,991–683,991
Income (loss) from operations172,464421,723594,187(4,062)590,125 Foreign exchange gain (loss), net105(458)(353)4(349) Interest and other income4,5684,2178,7852,94611,731 Other expenses–(22,538)(22,538)–(22,538) Finance costs(344)(14,428)(14,772)(4,032)(18,804)
Profit (loss) before income tax176,793388,516565,309(5,144)560,165
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 64 -
- REVENUE AND SEGMENT INFORMATION (Cont’d) Segment information (Cont’d) (a) Segment revenue and results (Cont’d) For the year ended December 31, 2024 Mine – Mine –produced producedcopperSegment goldconcentratetotalUnallocatedConsolidated US$’000US$’000US$’000US$’000US$’000 Revenue – external and segment revenue246,946509,700756,646–756,646 Cost of sales(165,574)(404,152)(569,726)–(569,726)
Mining operating earnings81,372105,548186,920–186,920
Income (loss) from operations80,93446,244127,178(3,984)123,194 Foreign exchange loss, net(2,087)(296)(2,383)(178)(2,561) Interest and other income2,6152582,8732,2365,109 Other expenses–(10,132)(10,132)–(10,132) Finance costs(404)(17,054)(17,458)(4,932)(22,390)
Profit (loss) before income tax81,05819,020100,078(6,858)93,220
The accounting policies of the operating segments are the same as the Group’s accounting policies. Segment
results represent profit (loss) before income tax without allocation of certain general and administrative
expenses, foreign exchange loss, other expenses, interest and other income and finance costs, attributable
to the respective segment. This is the measure reported to the CODM for the purposes of resource allocation
and performance assessment.
There are no inter-segment sales for the years ended December 31, 2025 and 2024.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 65 -
- REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information (Cont’d)
(b) Segment assets and liabilities
The following is an analysis of the Group’s assets and liabilities by segment representing assets/liabilities directly
attributable to the respective segment:
Mine –
Mine –produced
producedcopperSegment
goldconcentratetotalUnallocatedConsolidated
US$’000US$’000US$’000US$’000US$’000
As of December 31, 2025
Total assets750,9102,451,1313,202,041154,4943,356,535
Total liabilities50,237887,806938,04381,4661,019,509
As of December 31, 2024
Total assets599,9082,266,6112,866,51969,4602,935,979
Total liabilities34,8861,033,5761,068,46281,3111,149,773
For the purposes of monitoring segment performance and allocating resources between segments:
• all assets are allocated to operating segments other than certain cash and cash equivalents, other
receivables, prepaid expenses and deposits, right-of-use assets, property, plant and equipment and equity instruments at FVTOCI; and • all liabilities are allocated to operating segments other than other payables and accrued expenses, lease liabilities, deferred income and certain borrowings. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 66 -
- REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information (Cont’d)
(c) Other segment information (included in the measure of segment profit or loss or segment assets regularly provided
to the CODM)
Mine –
Mine –produced
producedcopperSegment
goldconcentratetotalUnallocatedConsolidated
US$’000US$’000US$’000US$’000US$’000
For the year ended
December 31, 2025 Additions of property, plant and equipment7,27643,45350,729–50,729 Additions of right-of-use assets14162,80762,94820663,154 Additions of intangible assets–150150–150 Depreciation of property, plant and equipment(36,882)(95,116)(131,998)–(131,998) Amortisation of intangible assets(719)(28,364)(29,083)–(29,083) Depreciation of right-of-use assets(3,318)(1,543)(4,861)(57) (4,918) For the year ended
December 31, 2024 Additions of property, plant and equipment6,31128,02734,338–34,338 Additions of right-of-use assets–11,21711,217–11,217 Depreciation of property, plant and equipment(54,408)(66,877)(121,285)–(121,285) Amortisation of intangible assets(788)(19,118)(19,906)–(19,906) Depreciation of right-of-use assets(3,606)(1,071)(4,677)(99)(4,776) NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 67 -
- REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information (Cont’d)
(d) Geographical information
The Group operated in two geographical areas, Canada and the PRC. The Group’s corporate division located
in Canada does not have any revenue and therefore is not presented as an operating segment. During the
years ended December 31, 2025 and 2024, the Group’s revenue was generated from gold sales and copper multi-products to customers in the PRC. Approximately 99% (2024: 98%) of non-current assets (excluding
equity instruments at FVTOCI) of the Group are located in the PRC. (e) Information about major customers Revenue from major customers which accounts for 10% or more of the Group’s total revenue are sales of
gold doré bars and copper concentrate including other by-products to CNG and its subsidiaries as disclosed in note 30(a). No third-party customers of the corresponding years contribute over 10% or more of the total
sales of the Group. - GENERAL AND ADMINISTRATIVE EXPENSES Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Administration and office9,8376,918 Depreciation of property, plant and equipment7,0726,867 Depreciation of right-of-use assets5499 Professional fees4,9486,492 Salaries and benefits21,34418,192 Others16,6798,998
Total general and administrative expenses59,93447,566
- OTHER EXPENSES Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Penalties on occupation of grasslands–8,739 Provision for litigation compensation and related interest charge15,8781,393 Impairment loss on other non-current assets (note 22)5,879– Others781–
Total other expenses22,53810,132
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 68 -
- FINANCE COSTS
Year endedYear ended
December 31,December 31,
20252024
US$’000US$’000
Interests on borrowings15,08119,527
Interests on lease liabilities84866
Interests on provision of the variable payment
arising from the mining right721425 Accretion on environmental rehabilitation (note 28)2,7472,811
19,39722,829 Less: Amounts capitalised to property, plant and equipment(593)(439)
Total finance costs18,80422,390
Interest has been capitalised at a capitalisation rate representing the weighted average interest to general borrowings. Year endedYear ended December 31,December 31, 20252024 %% Capitalisation rate1.892.07
- INCOME TAX EXPENSE/DEFERRED TAXATION The Company was incorporated in Canada and is subject to Canadian federal and provincial tax requirements which are calculated at 27% (2024: 27%) of the estimated assessable profit for the year ended December 31, 2025. PRC Enterprise Income Tax (“EIT”) is calculated at the prevailing tax rate of 25% (2024: 25%) on the estimated taxable profit of the group entities located in the PRC for the year ended December 31, 2025 except as described below. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 69 -
- INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d)
Pursuant to the Enterprise Income Tax Law (the “EIT” Law) effective on January 1, 2008, Inner Mongolia Pacific
Mining Co., Ltd. (“IMP”) is a certified “High and New Technology Enterprise” which is entitled to a preferential tax rate of 15% (2024: 15%) for three years from the year ended December 31, 2024 and eligible for renewal every
three years. Such certificate will be expired in December 2027. Pursuant to the Tibet Administration (2022) No. 11 Notice on Provisional Implementation Measures on Enterprise
Income Tax (“Notice No.11”), effective on April 29, 2022, Huatailong, which is certified as a “High and New Technology Enterprise” is entitled to preferential tax rate of 15% (2024: 15%) for three years from the year ended December 31, 2024 and eligible for renewal every three years. Such certificate will be expired in December 2027. Additionally, as Huatailong was established in the westward development area of the PRC, it enjoys an exemption from local income tax, which is set to expire on December 31, 2025. As such, Huatailong is entitled to a reduced preferential tax rate of 9% for the years ended December 31, 2025 and 2024. In February 2026, the local policy further extended the preferential tax rate for another 2 years period and will be expired in December 2027. Pursuant to Notice No.11, Metrorkongka County Jiama Industry and Trade Co., Ltd. (“Jiama Industry and Trade”), established in the westward development area of the PRC, employs 70% or more of its employees who are Tibet
Permanent Residents and enjoys the exemption on local income tax, thus Jiama Industry and Trade is entitled to a reduced preferential tax rate of 15% for the years ended December 31, 2025 and 2024. Under the EIT Law and Implementation Regulation of the EIT Law, except for the preferential treatments available to certain subsidiaries as mentioned above, other subsidiaries within the Group operating in the PRC are subject to EIT at the statutory rate of 25% during the years ended December 31, 2025 and 2024. Under relevant PRC Tax Law, withholding tax is imposed on dividends declared in respect of profits earned by the PRC subsidiaries from January 1, 2008 onwards. Except the Group has recognised deferred taxation US$23,491,000 (2024: US$3,690,000) on retained profits of the PRC subsidiary of US$234,905,000 (2024: US$36,902,000) for the year ended December 31, 2025, no deferred taxation has been provided for in the consolidated financial statements in respect of temporary differences attributable to accumulated distributable profits of the other PRC subsidiaries
amounting to approximately US$1,062,565,000 at December 31, 2025 (2024: US$774,487,000) as the Group is
able to control the timing of the reversal of temporary differences and it is probable the temporary differences will not reverse in the foreseeable future. Taxation for other relevant jurisdictions is calculated at the rates prevailing in each of those jurisdictions respectively. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 70 -
- INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d)
Tax expense comprises:
Year endedYear ended
December 31,December 31,
20252024
US$’000US$’000
Current tax:
PRC EIT56,71914,741
PRC withholding income tax on profit earned from
PRC subsidiaries7,3892,696 Underprovision in prior year – PRC EIT77206
64,18517,643
Deferred tax:
PRC EIT3,8656,589
PRC withholding income tax on profit earned from
PRC subsidiaries19,8003,690
23,66510,279
Total income tax expense87,85027,922
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 71 -
- INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) The income tax expense for the Group can be reconciled to the profit before income tax for the year as follows: Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Profit before income tax560,16593,220
PRC EIT tax rates25%25%
Tax at the PRC EIT tax rates140,04223,305
Tax effect of different tax rates of subsidiaries operating in
other jurisdictions(2,574)(4,841)
Tax effect of concessionary tax rate(79,790)(13,502)
Tax effect of tax losses and other deductible temporary
differences not recognised, net1,75412,669
Tax effect of non-deductible expenses1,1703,837
Tax effect of non-taxable income(28)(447)
Impacts on foreign exchange10309
Withholding tax in respect of profit earned from PRC subsidiaries27,1896,386
Underprovision of PRC EIT in prior year77206
87,85027,922
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 72 -
- INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d)
The following are the major deferred tax (assets) liabilities recognised and movements thereon during the current
and prior years: Distributable EnvironmentalMiningprofits of rehabilitationrights (1) InventoriesOtherssubsidiariesTotal US$’000US$’000US$’000US$’000US$’000US$’000 At January 1, 2024(10,900)107,7008,081(3,160)–101,721 Charge (credit) to profit or loss905(2,644)2,2196,1093,69010,279
At December 31, 2024(9,995)105,05610,3002,9493,690112,000 Charge (credit) to profit or loss338(3,916)2,8694,57419,80023,665
At December 31, 2025(9,657)101,14013,1697,52323,490135,665
(1)
Amount represents deferred tax liability arising from the fair value adjustment on mining rights during the business acquisition of
Skyland Mining Limited and its subsidiaries (“Skyland”) in December 2010.
For the purpose of presentation in the consolidated statement of financial position, certain deferred tax assets and
liabilities have been offset. The following is the analysis of the deferred tax balances for financial reporting purposes:
20252024
US$’000US$’000
Deferred tax assets––
Deferred tax liabilities(135,665)(112,000)
(135,665)(112,000)
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 73 -
- INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) The Group’s unrecognised deferred income tax assets are as follows: 20252024 US$’000US$’000 Deferred income tax assets Tax losses carry forwards30,98630,493 Other deductible temporary differences1,6561,657
Total unrecognised deferred income tax assets32,64232,150
Due to the unpredictability of future profit streams, deferred tax asset of US$30,986,000 (2024: US$30,493,000)
has not been recognised in respect of unused tax losses of US$147 million (2024: US$145 million) which are mainly
generated from the Company. Under Canadian tax laws, unused tax losses can be carried forward for 20 years if the
loss arises in tax years ended after December 31, 2005. Included in unrecognised tax losses are losses of US$82
million that will expire from 2027 to 2045 (2024: US$81 million that will expire from 2027 to 2044). Other losses
may be carried forward indefinitely.
Other deductible temporary differences of US$2 million (2024: US$2 million) are primarily comprised of share issue
costs and cumulative eligible capital expenditures that were incurred by the Company which are tax deductible
according to the relevant tax law in Canada. No deferred tax asset has been recognised because the amount of
future taxable profit that will be available to realise such assets is unpredictable and not probable.
The Group is within the scope of the Pillar Two model rules. The Group will account for the Pillar Two income taxes
as current tax when incurred. Pillar Two legislation has been enacted or substantively enacted but not yet in effect
as at 31 December 2025 in certain jurisdictions, such as the PRC, in which the Group operates.
Potential exposure is assessed based on the information available regarding the financial performance of the Group
in the current year. As such, it may not be entirely representative of future circumstances. Based on the assessment,
the Group’s effective tax rates in jurisdictions in which it operates are above 15% and the directors of the Company
are not currently aware of any circumstances under which they might change. Therefore, the Group does not expect
potential exposure to Pillar Two “top-up” taxes. The Group continues to follow Pillar Two legislative developments to
evaluate the potential future impact on its financial statements.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 74 -
- PROFIT FOR THE YEAR Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Profit for the year has been arrived at after charging (crediting): Auditor’s remuneration600767
Depreciation included in cost of sales and inventories124,924114,400 Depreciation included in research and development expenses218 Depreciation included in general and administrative expenses (note 6)7,0726,867
Total depreciation of property, plant and equipment131,998121,285
Depreciation included in cost of sales and inventories4,8644,677 Depreciation included in general and administrative expenses (note 6)5499
Total depreciation of right-of-use assets4,9184,776
Amortisation of mining rights (included in cost of sales)29,08319,906
Loss on disposal of property, plant and equipment2,369620
Staff costs Directors’ and chief executive’s emoluments (note 11)310493 Staff salaries and benefits19,61016,526 Retirement benefits contributions1,4241,173
Total salaries and benefits included in administrative expenses (note 6)21,34418,192 Total salaries and benefits included in cost of sales and inventories63,47056,443 Total salaries and benefits included in research and development expenses2,8822,340
Total staff costs87,69676,975
Bank interest income(8,705)(3,114)
Dividend income from equity instrument at FVTOCI(3,026)(2,095)
Government grants(871)(363)
Allowance for credit losses of trade and other receivables, net1,4342,051 Provision for impairment of other non-current assets (note 22)5,879–
Write-down of inventories–291
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 75 -
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (a) Directors’ and chief executive’s emoluments Directors’ and chief executive’s remuneration for the year, disclosed pursuant to the applicable Listing Rules and CO, is as follows: For the year ended December 31, 2025 SalariesRetirement and otherbenefits FeesbenefitscontributionsTotal US$’000US$’000US$’000US$’000 Executive Directors and Chief Executives (Note a) Chenguang Hou–––– Executive Directors (Note b) Na Tian–––– Yuanhui Fu–10610116 Non-executive Director (Note c) Wanming Wang–––– Independent Non-executive Directors (Note d) Yingbin Ian He53–356 Wei Shao45–146 Bielin Shi46––46 Ruixia (Rane) Han46––46
19010614310
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 76 -
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (Cont’d) (a) Directors’ and chief executive’s emoluments (Cont’d) For the year ended December 31, 2024 SalariesRetirement and otherbenefits FeesbenefitscontributionsTotal US$’000US$’000US$’000US$’000 Executive Directors and Chief Executives (Note a) Junhu Tong–26329 Chenguang Hou–––– Executive Directors (Note b) Weibin Zhang–1489157 Na Tian–––– Yuanhui Fu–1009109 Non-executive Director (Note c) Wanming Wang–––– Independent Non-executive Directors (Note d) Yingbin Ian He54–357 Wei Shao46–349 Bielin Shi46––46 Ruixia (Rane) Han46––46
19227427493
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 77 -
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (Cont’d) (a) Directors’ and chief executive’s emoluments (Cont’d) Notes: (a) Mr. Chenguang Hou was appointed as executive directors and Chief Executive Officer (“CEO”) effective from November 14,
- He is employed by CNG and his emolument payments are centralised and made by CNG for the years ended December
31, 2024 and 2025. Mr. Junhu Tong resigned as executive director and CEO effective from August 2, 2024. Mr. Junhu Tong
was also employed by CNG and partial of his emolument payments were centralised and made by CNG for the year ended
December 31, 2024. (b) The executive directors’ emoluments shown above were for their services in connection with the management of the affairs
of the Company and the Group. Ms. Na Tian is employed by CNG and her emolument payments are centralised and made by CNG for the years ended
December 31, 2024 and 2025. Mr. Weibin Zhang retired as an executive director of the Company with effect from the conclusion of the annual general
meeting held on June 26, 2025 (or June 27, 2025 Hong Kong time). (c) The non-executive director’s emoluments shown above were mainly for his services as director of the Company. (d) The independent non-executive directors’ emoluments shown above were mainly for their services as directors of the Company. For the years ended December 31, 2025 and 2024, none of the directors of the Company waived or agreed to waive any emoluments. (b) Five highest paid employees The five highest paid employees included one director (2024: two directors) for the year ended December 31, - The emoluments of the four (2024: three) non-director employees for the year ended December 31,
2025, are as follows: Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Employees Salaries and other benefits463385 Retirement benefits contributions1915
482400
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 78 -
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (Cont’d) (b) Five highest paid employees (Cont’d) The number of the highest paid employees who are not the directors of the Company whose remuneration fell within the following band is as follows: No. of individuals 20252024 Nil to HK$1,000,000 (equivalent to approximately US$129,000)21 HK$1,000,001 to HK$1,500,000 (equivalent to approximately US$129,001 to US$193,000)22
During the years ended December 31, 2025 and 2024, no emoluments were paid by the Group to the directors
of the Company or the five highest paid individuals as an inducement to join or upon joining the Group or as
compensation for loss of office.
12. DIVIDEND
During the year ended December 31, 2024, a dividend in respect of the year ended December 31, 2024 of US$0.08
per common share (the basic dividend of US$0.05, and the special dividend of US$0.03), in an aggregate amount
of US$31,713,000 was declared and paid to the shareholders of the Company upon the approval of the board
resolution dated March 26, 2025.
Subsequent to the end of the reporting period, a dividend in respect of the year ended December 31, 2025 of
US$0.47 per common share, in an aggregate amount of US$186,785,121, has been declared by the directors of
the Company upon the approval of the board resolution dated March 30, 2026.
13. EARNINGS PER SHARE
Profit used in determining earnings per share are presented below:
Year endedYear ended
December 31,December 31,
20252024
Profit attributable to owners of the Company for the purposes of basic
earnings per share (US$’000)466,95962,732
Weighted average number of common shares, basic396,413,753396,413,753
Basic earnings per share (US cents)117.8015.82
The Group had no outstanding potential dilutive instruments issued as at December 31, 2025 and 2024 and during
the years ended December 31, 2025 and 2024. Therefore, diluted earnings per share is the same as the basic
earnings per share.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 79 -
- CASH AND CASH EQUIVALENTS/RESTRICTED BALANCES/TERM DEPOSITS
Cash and cash equivalents of the Group are comprised of cash on hand and bank balances. The Group’s cash
and cash equivalents, restricted balances and term deposits denominated in the foreign currencies other than the respective group entities’ functional currencies are presented below: December 31,December 31, 20252024 US$’000US$’000 Denominated in: Canadian dollars179129 Renminbi (“RMB”)346,538170,392 US$–3 Hong Kong dollars4,8014,227
351,518174,751
The bank balances carry interest rates ranging from 0.05% to 1.485% (2024: 0.001% to 2.95%) per annum.
Restricted balances carry interest at market rates ranging from 0.05% to 0.10% (2024: 0.35% to 1.15%) per annum.
Included in the restricted balance as at December 31, 2025 and 2024, are cash held in designated bank accounts
restricted for mine reclamation and environmental rehabilitation purposes as required by government regulations,
certain amounts represents deposits that have been frozen by the Intermediate People’s Court of Lhasa City, Tibet
(“Tibet Intermediate Court”) in relation to the litigations involved by Huatailong. Details of litigations are set out in
note 31(i).
As at December 31, 2025, term deposits carry interest at fixed market rates ranging from 1.15% to 1.7% (2024:
1.5% to 2.0%) per annum. The Group’s term deposits represent deposits held in a CNG subsidiary denominated in
RMB with original maturities over three months and redeemable on maturity.
The Group maintains deposits with China National Gold Group Finance Company Limited (“China Gold Finance”),
a subsidiary of CNG, which is a related party. China Gold Finance holds a financial institution licence and provides
financial services exclusively to subsidiaries and associates of CNG.
These deposits are unsecured, interest-bearing at rates that are considered to be comparable to prevailing market
rates, and are cashable on demand or repayable at their stated maturity. Further details are disclosed in Note 30
(a) to the consolidated financial statements.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 80 -
- TRADE AND OTHER RECEIVABLES December 31,December 31, 20252024 US$’000US$’000 Trade receivables2,1112,473 Less: allowance for credit losses(344)(180)
1,7672,293 Amounts due from related companies (note 30(a)) (1) 2,7621,583 Other receivables (2) 3,7173,517
Total trade and other receivables8,2467,393
At January 1, 2024, trade receivables from contracts with customers amounted to US$1,466,000.
(1)
The amounts are unsecured, interest free and repayable on demand.
(2)
Included in the balance as at December 31, 2025 and 2024 are Tax and Other Surcharges (as defined in note 22) with carrying
amount of nil (2024: US$1,270,000), net of allowance for credit losses, to be recovered from Zhongxinfang Tibet Construction
Investment Co. Ltd. (“Zhongxinfang”), an independent third party property developer. As detailed disclosed in Note 31(i)(c).
Based on the best available information to the Group and the credit risk assessment of Zhongxinfang as of December
31, 2025, expected credit loss of RMB9,131,000 (equivalent to US$1,270,000) (2024: RMB13,697,000 (equivalent to
US$1,923,000) for the Tax and Other Surcharge from Zhongxinfang are recognised, and the accumulated allowance
for credit losses is RMB45,655,000 (equivalent to US$6,351,000) as of December 31, 2025 (2024: RMB36,524,000
(equivalent to US$5,081,000)).
The Group allows an average credit period of 30 days and 180 days to its trade customers.
Below is an aged analysis of trade receivables (net of allowance for credit losses) presented based on invoice dates,
which approximated the respective revenue recognition dates, at the end of the reporting period:
December 31,December 31,
20252024
US$’000US$’000
Less than 30 days714819
31 to 90 days241130
91 to 180 days3276
Over 180 days8091,068
Total trade receivables1,7672,293
In determining the recoverability of a trade receivable, the Group considers any change in the credit quality of the trade receivable from the date credit was initially granted up to the reporting date. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 81 -
- PREPAID EXPENSES AND DEPOSITS December 31,December 31, 20252024 US$’000US$’000 Deposit for acquisition of land use right (Note a)–23,906 Deposit for water treatment project–6,017 Deposit paid for acquisition of property, plant and equipment (Note b)74172 Other prepayment and deposits1,7941,513
1,86831,608 Less: Amounts that will be settled or utilised within one year shown under current assets(1,794)(1,513)
Amounts that will be settled or utilised for more than one year shown under non-current assets7430,095
Notes: a. The amounts comprised cost of land use right, grassland compensation fee paid to government authorities and relocation compensation fees paid to pastoralists, which are related to the acquisition of a land use right for the Phase III tailings dam construction project in Jiama Mine. During the year, the acquisition of land used rights was completed the relevant deposits paid was transferred to right of use assets. b. The amount represents deposits paid to third party contractors for the acquisition of property, plant and equipment to expand the Group’s mining capacity in Tibet, the PRC. The amount is shown as non-current asset. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 82 -
- INVENTORIES December 31,December 31, 20252024 US$’000US$’000 Gold in process249,498222,568 Gold doré bars8,28326,467 Consumables9,71311,119 Copper concentrate5,0175,959 Spare parts22,02524,292
Total inventories294,536290,405
Inventories totalling US$620,578,000 (2024: US$464,027,000) for the year ended December 31, 2025 was recognised in cost of sales. 18. RIGHT-OF-USE ASSETS LeaseholdLeasedLeased landsequipmentpropertiesTotal US$’000US$’000US$’000US$’000 At December 31, 2025 Carrying amount103,949391179104,519 At December 31, 2024 Carrying amount45,0318992745,957 For the year ended December 31, 2025 Depreciation charge4,441420574,918 For the year ended December 31, 2024 Depreciation charge4,208469994,776
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 83 -
- RIGHT-OF-USE ASSETS (Cont’d) Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Total cash outflow for leases (Note)21,16135,722
Additions to right-of-use assets63,15411,217
For both years, the Group leases leasehold lands, equipment and office premises for its operations. The lease terms
of leasehold lands are 2 years to in perpetuity (2024: 2 years to in perpetuity). Lease contracts of office premises and
equipment are entered into for a fixed term of 5 years (2024: 5 years). Lease terms are negotiated on an individual
basis and contain a wide range of different terms and conditions. In determining the lease term and assessing the
length of the non-cancellable period, the Group applies the definition of a contract and determines the period for
which the contract is enforceable.
The Group obtained several land use right certificates for leasehold lands where its mining facilities are primarily
located. Lump sum payments were made upfront to acquire these leasehold lands. The leasehold lands are presented
separately.
Note: The amount that the Group paid to government authorities and pastoralists of during the year ended 31 December 2024 of
US$23,906,000 as a deposit for acquisition of land use right is included in the total cash outflow for leases for the year ended 31
December 2024.
The Group depreciated the leasehold lands using the straight-line method over the estimated useful lives of the
leasehold land.
Restrictions or covenants on leases
In addition, lease liabilities of US$12,584,000 (2024: US$928,000) are recognised with related right-of-use assets of
US$13,458,000 (2024: US$926,000) as at December 31, 2025. The lease agreements do not impose any covenants
other than the security interests in the leased assets that are held by the lessor. Leased assets may not be used as
security for borrowing purposes.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 84 -
- EQUITY INSTRUMENTS AT FVTOCI December 31,December 31, 20252024 US$’000US$’000 Listed investments: Equity securities listed in Hong Kong (Note a)133,67847,599 Unlisted investments: Equity securities (Note b)197812
Total133,87548,411
Note:
a. The above investments represent 2.03% equity interest in ordinary shares of China Nonferrous Mining Corporation Limited (“CNMC”),
an entity listed in Hong Kong and is principally engaged in mining, processing and trading of nonferrous metals in Zambia. These
investments are not held for trading, instead, they are held for long-term strategic purposes. The directors of the Company have
elected to designate these investments in equity instruments as at FVTOCI as they believe that recognising short-term fluctuations
in these investments’ fair value in profit or loss would not be consistent with the Group’s strategy of holding these investments for
long-term purposes and realising their performance potential in the long run.
During the year ended December 31, 2025, a fair value gain of US$86,079,000 (2024: US$1,271,000) was recognised in other
comprehensive income and accumulated under the heading of investments revaluation reserve in accordance with the Group’s
accounting policies.
b. The above unlisted equity investments represent 7.425% (2024: 7.425%) share interest in Tibet Zhongjin Xinlian Demolition Engineering
Co. Ltd. (“Tibet Zhongjin Xinlian”) and 4% share interest in Tibet Electric Power Trading Center Co., Ltd. (“Tibet Electric”). Tibet
Zhongjin Xinlian is established in the PRC and principally engaged in the development and manufacturing of explosives. Tibet Electric
is established in the PRC and is principally engaged in the trading of electric power in the PRC. The directors of the Company have
elected to designate these investments in equity instruments as at FVTOCI as they believe that recognising short-term fluctuations
in these investments’ fair value in profit or loss would not be consistent with the Group’s strategy of holding these investments for
long-term purposes and realising their performance potential in the long run.
During the year, a fair value loss of unlisted investments of USD615,000 (2024: Nil) was recognised in other comprehensive income
and accumulated under the heading of investments revaluation reserve in accordance with the Group’s accounting policies. As
at December 31, 2025, the fair value of the unlisted equity investments are RMB1,385,000 (approximately US$197,000) (2024:
RMB5,838,000 (approximately US$812,000)),
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 85 -
- PROPERTY, PLANT AND EQUIPMENT FurnitureMachineryConstruction and officeandMotorLeaseholdMineralin progress BuildingsCrushersequipmentequipmentvehiclesimprovementsassets(“CIP”)Total US$’000US$’000US$’000US$’000US$’000US$’000US$’000US$’000US$’000 COST At January 1, 2024516,370227,33215,582311,73811,728981,419,318125,7112,627,877 Additions1,502–2,6775,0108–14,04811,09334,338 Transfer from CIP115,345–––––31(115,376)– Environmental rehabilitation adjustment (note 28)––––––(9)–(9) Disposals(997)–(37)(2,336)––––(3,370) Exchange realignment(8,257)–(195)(3,787)(123)–(12,787)(878)(26,027)
At December 31, 2024623,963227,33218,027310,62511,613981,420,60120,5502,632,809 Additions1,791–3,7855,6081,790–8,69629,05950,729 Transfer from CIP10,169–113––––(10,282)– Environmental rehabilitation adjustment (note 28)––––––20,249–20,249 Disposals––(142)(21)(550)–(2,098)–(2,811) Exchange realignment13,727–3655,868208–18,67070139,539
At December 31, 2025649,650227,33222,148322,08013,061981,466,11840,0282,740,515
ACCUMULATED DEPRECIATION At January 1, 2024(173,213)(187,449)(9,562)(186,509)(7,688)(98)(581,457)–(1,145,976) Provided for the year(30,023)(14,054)(1,653)(18,044)(862)–(56,649)–(121,285) Eliminated on disposals545–32,202––––2,750 Exchange realignment2,509–1132,17081–2,327–7,200
At December 31, 2024(200,182)(201,503)(11,099)(200,181)(8,469)(98)(635,779)–(1,257,311) Provided for the year(44,404)(658)(3,626)(16,959)(1,930)–(64,421)–(131,998) Eliminated on disposals––169405–––430 Exchange realignment(4,775)–(237)(3,676)(156)–(3,345)–(12,189)
At December 31, 2025(249,361)(202,161)(14,946)(220,807)(10,150)(98)(703,545)–(1,401,068
CARRYING VALUE At December 31, 2025400,28925,1717,202101,2732,911–762,57340,0281,339,447
At December 31, 2024423,78125,8296,928110,4443,144–784,82220,5501,375,498
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 86 -
- PROPERTY, PLANT AND EQUIPMENT (Cont’d)
Except for mineral assets and construction in progress, the above items of property, plant and equipment, taking
into account the residual value, are depreciated using the straight-line method over the estimated useful lives of the related assets as follows: BuildingsOver the shorter of the term of lease, or 24 years Crushers10 to 14 years Furniture and office equipment2 to 5 years Machinery and equipment2 to 10 years Motor vehicles5 to 10 years Leasehold improvementsOver the shorter of the term of lease, or 5.5 years Mineral assets mainly represent drilling, stripping and related costs incurred on sites with an existing mine and
on areas within the boundary of a known mineral deposit which contains proven and probable reserves and are
capitalised when they are incurred to improve access to the future ores. Mineral assets are depreciated using the
unit-of-production method based on the actual production volume over the estimated total proven and probable
reserves of the mines. Mineral Assets (a) CSH Gold Mine CSH Gold Mine, in which the Group holds a 96.5% equity interest, consists of a licensed area in the western part of Inner Mongolia, northern China. The site is centrally positioned within the east-west-trending Tian
Shan Gold Belt. The carrying value of the CSH Gold Mine in relation to mineral assets is US$80,734,000 as
at December 31, 2025 (2024: US$110,040,000). (b) Jiama Mine The Jiama Mine, a large copper-gold polymetallic deposit consisting of skarn-type and hornfels-type mineralization located in Metrorkongka County in Tibet, in which the Group holds 100% equity interest through its wholly- owned subsidiary, Skyland. The Group acquired Skyland on December 1, 2010. The carrying value of the Jiama Mine in relation to mineral assets is US$681,839,000 as at December 31, 2025 (2024: US$674,782,000). NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 87 -
- INTANGIBLE ASSETS PatentsMining rightsTotal US$’000US$’000US$’000 COST At January 1, 2024–1,009,9251,009,925 Exchange realignment–(1,018)(1,018)
At December 31, 2024–1,008,9071,008,907 Additions150–150 Exchange realignment21,5481,550
At December 31, 20251521,010,4551,010,607
ACCUMULATED AMORTISATION At January 1, 2024–(236,808)(236,808) Provided for the year–(19,906)(19,906) Exchange realignment–221221
At December 31, 2024–(256,493)(256,493) Provided for the year–(29,083)(29,083) Exchange realignment–(384)(384)
At December 31, 2025–(285,960)(285,960)
CARRYING VALUE At December 31, 2025152724,495724,647
At December 31, 2024–752,414752,414
Note:
The amounts represent two mining rights in the Jiama Mine and CSH Gold Mine. Mining rights in the Jiama Mine are in relation to the
copper and other by-products production, acquired through the acquisition of Skyland. The mining right of Jiama Mine was renewed in
October 2023 and will expire in October 2043. The mining permit of CSH Gold Mine was renewed in May 2025 for a period of 20 years
and will expire in May 2045.
Amortisation on mining rights acquired is provided to write off the cost of the mining rights using the unit-of-production method based on
the actual production volume over the estimated total proven and probable reserves of the mines.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 88 -
- OTHER NON-CURRENT ASSETS
During the year ended December 31, 2019, the Group entered into a cooperation agreement (the “Cooperation
Agreement”) with Zhongxinfang in relation to the development of a composite project in Lhasa, Tibet, China. Pursuant to the Cooperation Agreement, the Group agreed to transfer the land use right for the development and Zhongxinfang agreed to compensate the Group by transferring a block of the buildings and twenty car parks (the “New Premises”) within two years from the date of the Cooperation Agreement (the “Land Exchange”) and reimbursing all related tax exposures including but not limited to land appreciation tax, EIT and other surcharge related to the Land Exchange (the “Tax and Other Surcharge”). During the year ended December 31, 2019, the land use right was transferred
to Zhongxinfang. Accordingly, the Group derecognised the right-of-use assets and recognised the right to receive
the New Premises, which approximates the fair value of the New Premises at the date of transfer and the other
receivables relating to the tax reimbursement from Zhongxinfang. The right to receive the New Premises was initially recognised at its fair value and subsequently carried at cost less impairment. Based on the Cooperation Agreement, Zhongxinfang is obligated to deliver the New Premises to the Group no later than May 31, 2021. As at December 31, 2025 and up to the date these consolidated financial statements are authorised for issue,
the composite project is still suspended due to litigations against Zhongxinfang and the New Premises are still not delivered to Huatailong. Further details are disclosed in Note 31(i)(b). Based on Group’s assessment on the status of the New Premises and taking into account the valuation of the New Premises by using sales comparison method under market approach as its fair value less cost of disposal, impairment loss of RMB41,995,000 (equivalent to US$5,879,000) (2024: nil) has been made during the year ended December 31, 2025 and the carrying amount of the other non-current assets are RMB69,929,000 (equivalent to US$9,949,000) as at December 31, 2025 (2024: RMB111,924,000 (equivalent to US$15,570,000)). - ACCOUNTS AND OTHER PAYABLES AND ACCRUED EXPENSES
Accounts and other payables of the Group are principally comprised of amounts outstanding for trade purchases
relating to minerals production activities and construction activities. The average credit period taken for trade
purchases is between 120 to 150 days. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 89 -
- ACCOUNTS AND OTHER PAYABLES AND ACCRUED EXPENSES (Cont’d) Accounts and other payables and accrued expenses comprise the following: December 31,December 31, 20252024 US$’000US$’000 Accounts payable36,02125,811 Construction costs payable91,18184,218 Mining loyalties payable (Note a)50,57749,057 Payable for litigation compensation (note 31)–23,872 Payable for acquisition of a mining right1,2012,349 Payroll and benefit payable2,085286 Mining cost accrual1,5441,544 Other accruals2,4722,231 Other tax payables13,0069,719 Other payables9,1608,867
Total accounts and other payables and accrued expenses207,247207,954
Current181,828175,132 Non-current (Note a)25,41932,822
207,247207,954
Note:
a. As stipulated in an agreement with local authorities and relevant government notices. Since 2017, the Group is required to pay
royalties to the PRC government for the use of state-owned natural resources in relation to the Jiama Mine, calculated based on
invoiced revenue and ore yield. The royalties payable for 2017 to May 2023 was allowed to be settled with six fixed annual instalments
of RMB61.3 million each, totalling RMB368 million with first instalment payable from 2024 and final instalment due in 2029. The
royalties from May 2023 onwards are payable annually.
As at December 31, 2025, the mining royalties payable consist of (i) RMB235,936,000 (equivalent to US$33,567,000) (2024:
RMB292,102,000 (equivalent to US$40,635,000)) being present value of remaining four (2024: five) annual instalments and (ii)
RMB119,562,000 (equivalent to US$17,010,000) (2024: RMB60,542,000 (equivalent to US$8,422,000)) being royalties payable
based on invoiced revenue and ore yield during the year.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 90 -
- ACCOUNTS AND OTHER PAYABLES AND ACCRUED EXPENSES (Cont’d)
The following is an aging analysis of the accounts payable presented based on the invoice date at the end of the
reporting period: December 31,December 31, 20252024 US$’000US$’000 Less than 30 days20,77911,094 31 to 90 days4,5615,330 91 to 180 days1,5933,298 Over 180 days9,0886,089
Total accounts payable36,02125,811
- CONTRACT LIABILITIES December 31,December 31, 20252024 US$’000US$’000 Sales of copper concentrate10,0638,099
At January 1, 2024, contract liabilities amounted to US$71,000. The following table shows how much of the revenue recognised relates to carried-forward contract liabilities. Copper concentrate December 31,December 31, 20252024 US$’000US$’000 Revenue recognised that was included in the contract liability balance at the beginning of the year8,09971
Typical payment terms which have an impact on the amount of contract liabilities recognised are as follows: When the Group receives a deposit before the goods are delivered, this will give rise to contract liabilities at the start of a contract, until the revenue recognised on the relevant contract exceeds the amount of the deposit. The Group typically receives 100% deposit on acceptance of sales orders for copper concentrate including other by-products. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 91 -
- BORROWINGS December 31,December 31, 20252024 US$’000US$’000 Bank loans422,467633,666 Loans payable to a CNG’s subsidiary (note 30)82,51880,686
504,985714,352
The borrowings are repayable as follows: December 31,December 31, 20252024 US$’000US$’000 Carrying amount repayable within one year217,004148,696 Carrying amount repayable within one to two years107,415254,855 Carrying amount repayable within two to five years111,756212,914 Carrying amount repayable over five years68,81097,887
504,985714,352 Less: Amounts due within one year (shown under current liabilities)(217,004)(148,696)
Amounts shown under non-current liabilities287,981565,656
Included in the carrying amounts of borrowings as above, except for loans payables to a CNG’s subsidiary, all
remaining borrowings are bank loans.
The loans payables to a CNG’s subsidiary amounted to US$56,909,000 (2024: Nil) are repayable within one year,
US$25,609,000 (2024: US$55,646,000) are repayable within one to two years and Nil (2024: US$25,040,000) are
repayable within two to five years as at December 31, 2025.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 92 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 93 -
- BORROWINGS (Cont’d) Analysed as: December 31,December 31, Notes20252024 US$’000US$’000 Secured syndicated loan(1)197,119245,605 Unsecured syndicated loan (Note a)(2)117,182118,754 Unsecured syndicated loan(3)7,114– Unsecured bank loan(4)–39,647 Unsecured bank loans(5)–88,059 Unsecured bank loan(6)12,80413,216 Unsecured bank loan(7)–38,952 Unsecured bank loan(8)9,24810,433 Unsecured bank loan(9)15,00015,000 Unsecured bank loan(10)20,00020,000 Unsecured bank loan(11)44,00044,000 Unsecured loans payable to a CNG’s subsidiary(12)56,90955,646 Unsecured loans payable to a CNG’s subsidiary(13)25,60925,040
504,985714,352
- BORROWINGS (Cont’d)
Notes:
(1)
Repayable by instalment and will reach full maturity in November 2028. The loan carries a floating interest rate, currently set at
1.50% (2024: 1.95%) per annum, based on the People’s Bank of China National Interbank Funding Center Loan Prime Rate (“LPR”) benchmark. The carrying values of the pledged assets to secure above borrowing by the Group are as follows: December 31,December 31, 20252024 US$’000US$’000 Mining rights723,579750,627
(2)
Repayable by instalment and will reach full maturity in April 2033. The loan carries a floating interest rate, currently set at 1.95%
(2024: 1.95%) per annum, based on the LPR benchmark.
(3)
Repayable by instalment and will reach full maturity in June 2030. The loan carries a floating interest rate, currently set at 1.50%
per annum, based on the LPR benchmark.
(4)
Repayable by instalment and will reach full maturity in May 2026. The loan carries a floating interest rate, currently set at 1.85%
(2024: 1.85%) per annum, based on the LPR benchmark. The Group early repaid the loan prior to maturity during the year.
(5)
Repayable by instalment and will reach full maturity in June 2026. These loans carry a floating interest rate, currently set at a range
from 1.85% to 1.95% (2024: from 1.35% to 1.60%) per annum, based on the LPR benchmark. The Group early repaid the loan
prior to maturity during the year.
(6)
Repayable by instalment and will reach full maturity in November 2026. The loan carries a floating interest rate, currently set at
1.85% (2024: 1.35%) per annum, based on the LPR benchmark.
(7)
Repayable by instalment and will reach full maturity in January 2027. The loan carries a floating interest rate, currently set at 1.85%
(2024: 1.60%) per annum, based on the LPR benchmark. The Group early repaid the loan prior to maturity during the year.
(8)
Repayable by instalment and will reach full maturity in May 2027. The loan carries a floating interest rate, currently set at 1.85%
(2024: 1.60%) per annum, based on the LPR benchmark.
(9)
Repayable in full in May 2026. The loan carried a floating interest rate, currently set at 4.24% per annum (2024: 5.35%), based on
the Secured Overnight Financing Rate (“SOFR”) benchmark during the year December 31, 2025.
(10)
Repayable in full in May 2026. The loan carried a floating interest rate, currently set at 4.36% per annum (2024: 5.33%), based on
the SOFR benchmark during the year December 31, 2025.
(11)
Repayable in full in May 2026. The loan carried a floating interest rate, currently set at 4.36% per annum (2024: 5.35%), based on
the SOFR benchmark during the year December 31, 2025.
(12)
Repayable in full in May 2026, carried fixed interest rate at 2.05% (2024: 2.05%) per annum.
(13)
Repayable in full in August 2027, carried fixed interest rate at 2.45% (2024: 2.05%) per annum.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 94 -
- BORROWINGS (Cont’d) In respect of bank loans with carrying amount of US$ 343,467,000 as at December 31, 2025 (2024: US$298,742,000), the Group is required to comply with certain significant financial covenants throughout the continuance of the relevant bank loans and/or as long as the bank loans are outstanding. These covenants include, but are not limited to, the following: the ratio of liabilities to assets of the borrower must not be more than certain percentage and the ratio of current asset to current liabilities of the borrower must be more than 0.5, among others. Fixed rate loans amounting to approximately US$82,518,000 (2024: US$80,686,000), carry weighted average effective interest rate of 2.17% (2024: 2.14%) per annum.
- ENTRUSTED LOAN PAYABLE
On December 25, 2023, the Group entered into a three-year entrusted loan agreement with CNG (note 30) and China
Gold Finance, in which CNG provided a loan of RMB200 million (equivalent to approximately US$28,454,000 as
at December 31, 2025 (2024: US$27,823,000)) to the Group through China Gold Finance as the entrusted bank. The entrusted loan is unsecured and carries interest at a fixed rate of 2.45% per annum. The principal amount is to be repaid on December 26, 2026. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 95 -
- LEASE LIABILITIES Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Lease liabilities payable: Within one year1,417469 Within a period of more than one year but not more than two years885459 Within a period of more than two years but not more than five years2,280– Within a period of more than five years9,463–
14,045928
Less: Amount due for settlement within 12 months shown under
current liabilities(1,417)(469)
Amount due for settlement after 12 months shown under
non-current liabilities12,628459
The weighted average incremental borrowing rate applied to lease liabilities range is 6.39% (2024: 4.67%).
28. ENVIRONMENTAL REHABILITATION
The environmental rehabilitation relates to reclamation and closure costs relating to the Group’s mine operations
at the CSH Gold Mine and Jiama Mine. The environmental rehabilitation is calculated as the net present value of
estimated future net cash flows of the reclamation and closure costs of US$112,169,000 (2024: US$104,729,000),
discounted at 2.4% (2024: 5.7%) per annum at December 31, 2025.
The following is an analysis of the environmental rehabilitation:
20252024
US$’000US$’000
At January 169,94875,924
Additions to site reclamation (note 18)20–
Adjustments and additions to site reclamation resulted from changes in
disturbance areas and discount rates (note 20) 20,249(9)
Accretion incurred in the current year2,7472,811
Payment during the year(692)(7,841)
Exchange realignment1,506(937)
At December 3193,77869,948
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 96 -
-
SHARE CAPITAL Common shares (i) Authorised – Unlimited common shares without par value (ii) Issued and outstanding Number of sharesAmount US$’000 Issued & fully paid: At January 1, 2024, December 31, 2024 and 2025396,413,7531,229,061
-
RELATED PARTY TRANSACTIONS Related parties are those parties that have the ability to control the other party or exercise significant influence in making financial and operation decisions. Parties are also considered to be related if they are subject to common control.
CNG, a state owned company registered in Beijing, PRC, which is controlled by State-owned Assets Supervision and Administration Commission of the State Council of the PRC, is able to exercise significant influence over the Company. The management believes that information relating to related party transactions have been adequately disclosed in accordance with the requirements of IAS 24 Related party Disclosures. In addition to the related party transactions and balances shown elsewhere in these consolidated financial statements, the following is a summary of significant related party transactions entered into in the ordinary course of business
between the Group and its related parties for the years ended December 31, 2025 and 2024 and related party
balances as at December 31, 2025 and 2024. Name and relationship with related parties during the years are as follows: CNG owned the following percentages of outstanding common shares of the Company: December 31,December 31, 20252024 CNG40.0140.01
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 97 -
- RELATED PARTY TRANSACTIONS (Cont’d) (a) Transactions/balances with CNG and its subsidiaries The Group had the following transactions with CNG and CNG’s subsidiaries: December 31,December 31, 20252024 US$’000US$’000 Gold doré bars sales by the Group (Note a)338,473246,946
Copper and other by-product sales by the Group (Note b)964,772505,068
Other income–710
Provision of transportation services by the Group (Note b)2,3041,161
Construction, stripping and mining services provided to
the Group (Note b)139,13991,281
Accrued expenses for short-term property
management fee (Note b)455456
Commitment fee597622
Interest income4,7282,492
Interest expense on borrowings and entrusted loan payable2,4852,498
Interest expense on lease liabilities (Note b)4161
Loans (note 25) provided to the Group during the year–25,275
Notes:
a. On May 7, 2014, the Company’s subsidiary, IMP entered into an exclusive contract for the sale of doré with CNG pursuant
to which IMP sells gold doré bars to CNG for the period up to December 31, 2017. On May 26, 2017, IMP and CNG entered
into the Supplemental Contract for Purchase and Sale of Dore for an extended term commencing on January 1, 2018 and
expiring on December 31, 2020. On May 6, 2020, the IMP and CNG entered into the third Supplemental Contract for Purchase
and Sale of Dore for an extended term commencing on January 1, 2021 and expiring on December 31, 2023. On May 11,
2023, the IMP and CNG entered into the fourth Supplemental Contract for Purchase and Sale of Dore for an extended term
commencing on January 1, 2024 and expiring on December 31, 2026.
The extent of the continuing connected transactions for the years ended December 31, 2025 and 2024 did not exceed the
limit as set out in the announcements of the Company on May 11, 2023.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 98 -
- RELATED PARTY TRANSACTIONS (Cont’d)
(a) Transactions/balances with CNG and its subsidiaries (Cont’d)
b. On April 26, 2013, the Company entered into a product and service framework agreement with CNG for the provision of mining
related services and products to the Company for three years until June 18, 2016. The agreement was amended to extend
the term of the agreement to December 31, 2017 and to include copper concentrates sales contract and office lease contract with CNG since May 29, 2015. On May 26, 2017, the Company and CNG entered into the second supplemental product and service framework agreement to extend the term to December 31, 2020 and to extend the scope of the supplemental product and service framework agreement to include leasing services to be provided by Zhongxin International Financial Leasing
(Shenzhen) Co. Ltd., the shares of which are 80% owned by CNG. On May 6, 2020, the Company and CNG entered into the third supplemental product and service framework agreement to extend the term to December 31, 2023. On May 11, 2023, the Company and IMP entered into the fourth supplemental product and service framework agreement for an extended term commencing on January 1, 2024 and expiring on December 31, 2026. The extent of the continuing connected transactions for the years ended December 31, 2025 and 2024 did not exceed the limit as set out in the announcements of the Company on May 11, 2023. c. On December 18, 2017, the Company and China Gold Finance entered into a deposit services agreement (“Deposit Services Agreement”) pursuant to which the Company and its subsidiaries may, from time to time, make withdrawals and deposits with China Gold Finance commencing from January 1, 2018 for one year. On December 18, 2018, the Deposit Services Agreement has been extended for a one year term to December 31, 2019
pursuant to the supplemental deposit services agreement. On December 31, 2019, the Deposit Services Agreement have been extended for a one year term to December 31, 2020
pursuant to the supplemental deposit services agreement, all other terms and conditions remain the same. On December 22, 2020, the Company and China Gold Finance entered into a second Deposit Services Agreement to extend for one year term to December 31, 2021 with all other terms and conditions remaining the same. The second Deposit Services Agreement was expired with the effective of the third Deposit Services Agreement on June 30, 2021 as described below. On May 5, 2021, the Company and China Gold Finance entered into a third Deposit Services Agreement pursuant to which the Company and its subsidiaries may, from time to time, make withdrawals and deposits with China Gold Finance up to a
daily maximum deposit balance (including interest) not exceeding RMB3,000 million (approximately equivalent to US$465
million) and extend for three years term to December 31, 2023 with all other terms and conditions remaining the same and the third Deposit Services Agreement was effective on June 30, 2021. On May 8, 2024, the Company and China Gold Finance entered into the 2024 Financial Services Agreement pursuant to which the Company and its subsidiaries may, from time to time, make withdrawals and deposits with China Gold Finance up to a
daily maximum deposit balance (including interest) not exceeding (i) RMB2,600 million (approximately equivalent to US$365 million) for the year ended December 31, 2024; (ii) RMB3,000 million (approximately equivalent to US$421 million) for the year ended December 31, 2025; (iii) RMB3,400 million (approximately equivalent to US$477 million) for the year ending
December 31, 2026. The extend of the connected transaction for deposit services during the years ended December 31, 2025 and 2024 do not exceed the limit as set out in the announcement of the Company on May 8, 2024. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 99 -
- RELATED PARTY TRANSACTIONS (Cont’d) (a) Transactions/balances with CNG and its subsidiaries (Cont’d) The Group has the following significant balances with CNG and its subsidiaries at the end of each reporting period: December 31,December 31, 20252024 US$’000US$’000 Assets Amounts due from related companies (note 15)2,7621,583 Cash and cash equivalents held in a CNG’s subsidiary (Note c)179,182150,315 Term deposits held in a CNG’s subsidiary (Note c)206,294118,246 Restricted balance held in a CNG’s subsidiary (Note c)–66,698
Total amounts due from CNG and its subsidiaries388,238336,842
Other than the cash and cash equivalents, term deposits and restricted balance held in a CNG’s subsidiary, the remaining amounts due from CNG and its subsidiaries as at December 31, 2025 and 2024, which are included in trade and other receivables are non-interest bearing, unsecured and repayable on demand. December 31,December 31, 20252024 US$’000US$’000 Liabilities Entrusted loan payable (note 26)28,45427,823 Loans payable to a CNG’s subsidiary (note 25)82,51880,686 Construction costs payable to CNG’s subsidiaries12,20719,515 Trade payable to CNG’s subsidiaries2,246952 Amount due to CNG1,7864,080 Contract liabilities with a CNG’s subsidiary10,0258,085 Lease liabilities to a CNG’s subsidiary469897
Total amounts due to CNG and its subsidiaries137,705142,038
Trade payable, construction costs payable and contract liabilities to CNG’s subsidiaries are in trade nature,
non-interest bearing and unsecured.
Amount due to CNG included in other payables is non-trade in nature, non-interest bearing, unsecured and
has no fixed term of repayment.
Entrusted loan payable, loans payable and lease liabilities to CNG and its subsidiaries are non-trade in nature,
interest-bearing, unsecured and have fixed term of repayment as detailed in respective notes.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 100 -
- RELATED PARTY TRANSACTIONS (Cont’d)
(b) Compensation of key management personnel
Other than the directors’ emoluments disclosed in note 11(a), the Group has the following compensation to
other key management personnel during the years: Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Salaries and other benefits364237 Post-employment benefits2218
386255
- CONTINGENCIES
(i) Litigation with Huaxin and Zhongxinfang
During the year ended December 31, 2020, there was a construction contract dispute between independent
third parties including the constructor, Huaxin Construction Group Co., Ltd. (formerly named as “Nantong
Huaxin Construction Group Co., Ltd.”) (“Huaxin”), Zhongxinfang, and the Group’s subsidiary, Huatailong
(the “Construction Contract”). The land use right of a composite project under the Construction Contract was transferred from Huatailong to Zhongxinfang in 2019 pursuant to the Cooperation Agreement in relation to the Land Exchange (as defined in note 22). (a) Litigations with Huaxin and Zhongxinfang for the construction costs Since 2020, there were legal proceedings on the Construction Contract between Huaxin, Zhongxinfang
and Huatailong of which details were disclosed in the Group’s annual financial statements for the year
ended 31 December 2024. Pursuant to the final instance adjudication dated June 5, 2023 (the “June 2023 Huaxin Final Instance Adjudication”), it is affirmed that Zhongxinfang and Huatailong shall have the joint obligation for the
construction costs. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 101 -
- CONTINGENCIES (Cont’d)
(i) Litigation with Huaxin and Zhongxinfang (Cont’d)
(a) Litigations with Huaxin and Zhongxinfang for the construction costs (Cont’d)
During the year, Huatailong has paid to the Lhasa Intermediate Court the full compensation amount of
RMB178 million (equivalent to US$24,869,000) for the settlement of accumulated litigation compensation and additional interest recognised during the period, of which RMB35 million (equivalent to US$4,870,000) was paid to Huaxin as partial settlement and the remaining RMB143 million has been frozen by the Lhasa Intermediate Court pending for the resolution of a separate countersuit by Huatailong against Zhongxinfang as further detail in note 31(i)(b) below. Consequently, the Lhasa Intermediate Court has lifted and discharged the enforcement measures on
certain bank balances, non-current assets, leasehold lands, equity instruments, building and 51% equity interest in Jiama Industry and Trade, a subsidiary of the Company. On September 16, 2025, subsequent to the full settlement payment mentioned above, Huatailong received a civil ruling from the People’s Court of Duilongdeqing District, Lhasa, which ordered the freezing of
certain bank accounts of Huatailong with a total value of approximately RMB59.6 million (equivalent to approximately US$8,320,000). This freezing is a pre-litigation asset preservation measure initiated by
Huaxin in connection with in connection with a potential lawsuit to be filed by Huaxin on claiming the
remaining unpaid contract balance of the Construction Contract of approximately RMB52.0 million and accrued interest, which Huaxin is now pursuing against Huatailong after being unable to recover it from the insolvent co-obligor, Zhongxinfang. The freezing period is one year, from August 29, 2025 to August 28, 2026. As of the end of the reporting period, the actual aggregated amounts frozen were approximately RMB34.0 million (equivalent to US$4,832,000). The freezing has not materially impacted Huatailong’s normal
operations due to sufficient liquidity in other accounts. No outstanding litigation compensation payable
exists in relation to litigation with Huaxin as of December 31, 2025. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 102 -
- CONTINGENCIES (Cont’d)
(i) Litigation with Huaxin and Zhongxinfang (Cont’d)
(b) Litigations with Zhongxinfang for the delivery of New Premises and recovery of Tax and Other Surcharge
related to the land exchange whereby the Group agreed to transfer the land use right for the development of a composite project and Zhongxinfang agreed to compensate the Group by the New Premises During the year ended December 31, 2020, Huatailong filed a lawsuit against Zhongxinfang for the recovery of the construction costs of RMB149 million (equivalents to US$21,319,000) that shall be jointly borne by Huatailong. After the first instance adjudication and appeals by Zhongxinfang, on June 20, 2023, Tibet High Court adjudicated that the September 2020 Adjudication sustained (the “June 2023 Zhongxinfang Final Instance Adjudication”) and Zhongxinfang should pay relevant compensation to Huatailong within 15 days from the effective date of the June 2023 Zhongxinfang Final Instance Adjudication. On 15
September 2023, Huatailong applied for an enforcement of the June 2023 Zhongxinfang Final Instance Adjudication (the “September 2023 Enforcement”) and as at December 31, 2025 and up to the date
of these consolidated financial statements are authorised for issue, Zhongxinfang has not yet paid the
compensation to Huatailong and the September 2023 Enforcement is not executed mainly because
Zhongxinfang is involved in several litigations and there are no executable properties. (c) Litigations with Zhongxinfang for the delivery of New Premises and recovery of Tax and Other Surcharge During 2020 and 2021, Huatailong proceeded lawsuits against Zhongxinfang concerning (i) the delivery of certain premises (the “New Premises”) and a penalty, and (ii) the recovery of Tax and Other Surcharges paid by Huatailong amounting to RMB46 million (equivalent to USD6.4 million), respectively. Pre-litigation asset preservation measures are in place with (i) the New Premises comprising a block of buildings
and twenty car parks from Zhongxinfang were frozen and (ii) the value of certain properties limited to
RMB46 million (equivalent to US$6,609,000) from Zhongxinfang was frozen (collectively the “Pre-litigation Preservations”). As at December 31, 2025, the Pre-litigation Preservations were extended to May 2027. Based on the adjudication issued in relation to the lawsuit against Zhongxinfang, Zhongxinfang shall repay the Tax and Other Surcharge to Huatailong. As Zhongxinfang has not settled such amount within the due date, Huatailong applied for an enforcement of the November 2020 Adjudication in January 2021 (the
“2021 Enforcement”). However, on June 24, 2021, the Tibet Intermediate Court adjudicated the 2021
Enforcement be suspended as all of the assets owned by Zhongxinfang have been sealed up or frozen and there are no executable properties from Zhongxinfang. As at December 31, 2025 and up to the date these consolidated financial statements are authorised for issue, the New Premises are still not delivered to Huatailong. In the opinion of directors, (i) the 2021
Enforcement is currently suspended and the Group’s first priority of claim over one of the assets under Pre-litigation Preservations has been extended to May 2027, (ii) the enforcement of the adjudication that Zhongxinfang should pay penalty of RMB9 million to Huatailong that was applied by Huatailong in March 2023 is currently under proceeding and the result is not ascertained as at the date these consolidated
financial statements are authorised for issue. Further background on these matters is disclosed in the
Group’s annual financial statements for the year ended December 31, 2024. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 103 -
- CONTINGENCIES (Cont’d)
(ii) Litigation with an independent supplier of Huatailong
In May 2023, a supplier of Huatailong (the “Supplier”) proceeded a lawsuit against Huatailong for the loss
of work stoppage and slowdown resulting from the suspension of Jiama Mine’s south pit (the “Supplier Work Stoppage Loss”) which are required to be remediated by local government from June 19, 2021, for a claim
of RMB479 million (equivalent to US$66,698,000), and applied for pre-litigation preservation of assets from
Huatailong for one year. On May 24, 2023, the Tibet Intermediate Court adjudicated balance with same amount as aforementioned
placed in China Gold Finance by the Group to be frozen for one year, which was further extended up to 2026. As disclosed in the Group’s annual financial statements for the year ended December 31, 2024, and condensed consolidated financial statements for the 9 months ended September 30, 2025, there were several appeals
and retrial since the litigation of the legal proceedings in May 2023. The case was appealed to the Tibet High Court on June 10, 2025. On September 29, 2025, the Tibet High Court has issued a final judgment that Huatailong shall pay the
Supplier Work Stoppage Loss of RMB108 million (equivalent to US$15,058,000) to that independent supplier. The Group paid the judgment amount in full during the year ended December 31, 2025, and this litigation
is now concluded. Following the conclusion of the litigation in 2025, the relevant assets were released from
preservation on December 4, 2025. (iii) Litigation with Zhejiang Huaye Mining Construction Group Co., Ltd. (“Huaye”) During the year, Huaye, a mine construction contractor of the Group, filed a lawsuit against Huatailong, and another party which is a fellow subsidiary of the Company. The aggregate claims over Huatailong are approximately RMB127 million (equivalent to US$17.9 million), primarily for payments related to acquisitions of assets and payments for construction works on one of the Group’s mine in Tibet. As of December 31, 2025, the lawsuit is still in progress. With reference to legal opinion obtained, the Directors are of the view that outflow of economic benefitsis not probable as at the reporting date. Therefore, no provision has been recognised in the consolidated financial statements for the year ended December 31, 2025. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 104 -
- CAPITAL RISK MANAGEMENT
The Group’s objectives when managing capital are to safeguard the Group’s ability to continue as a going concern
in order to operate its mines, pursue the development of its mineral properties and to maintain a flexible capital
structure which optimizes the costs of capital at an acceptable risk. The Group’s overall strategy remains unchanged from prior years. The capital structure of the Group consists of net debt, which includes the borrowings, entrusted loan payable and lease liabilities disclosed in notes 25, 26 and 27 respectively, net of cash and cash equivalents, restricted balances and equity attributable to owners of the Company, comprising issued share capital, retained profits and other reserves. The Group manages the capital structure and makes adjustments to it in light of operating results, changes in
economic conditions and the risk characteristics of the underlying assets. To maintain or adjust the capital structure, the Group may attempt to issue new shares, issue new debt, repayment of existing debt. In order to facilitate the management of its capital requirements, the Group prepares annual expenditure budgets that are updated as necessary depending on various factors, including operating results, successful capital deployment and general industry conditions. The annual and updated budgets are approved by the board of directors of the Company. In order to maximize ongoing development efforts, the Group is committed to providing sustainable returns to
shareholders. The Group’s policy is to invest its short-term excess cash in fixed bank deposits with maturities of 1 year or less from the original date of acquisition, selected with regards to the expected timing of expenditures from its operations. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 105 -
- FINANCIAL INSTRUMENTS December 31,December 31, 20252024 US$’000US$’000 Financial assets Financial assets at amortised cost747,694376,116 Equity instruments at FVTOCI133,87548,411
Financial liabilities At amortised cost721,579936,349 Lease liabilities14,045928
Financial assets at amortised cost as at December 31, 2025 and 2024 respectively are as follows: December 31,December 31, 20252024 US$’000US$’000 Cash and cash equivalents399,402183,779 Term deposits305,884118,246 Restricted balances34,16266,698 Trade and other receivables (1) 8,2467,393
747,694376,116
Financial liabilities at amortised cost as at December 31, 2025 and 2024 are as follows: December 31,December 31, 20252024 US$’000US$’000 Accounts and other payables (2) 188,140194,174 Borrowings – Loans, other than syndicated loans183,570349,993 – Syndicated loans321,415364,359 Entrusted loan payable28,45427,823
721,579936,349
(1) Excluded VAT recoverable. (2) Excluded mining cost accrual, other accruals, payroll and benefit payable and other tax payables. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 106 -
- FINANCIAL INSTRUMENTS (Cont’d)
The Group’s financial instruments are exposed to certain financial risks including market risk (e.g. currency risk,
interest rate risk and other price risk), credit risk and liquidity risk. (a) Currency risk The Group is exposed to the financial risk related to the fluctuation of foreign exchange rates for the monetary assets and liabilities denominated in the currencies other than the functional currencies to which they related. The Group has not hedged its exposure to currency fluctuations. However, the Management monitors foreign exchange exposure and will consider hedging significant foreign currency exposure should the need arise. At the end of each reporting period, Huatailong and Skyland Mining Limited (note 37), of which its functional currency is RMB, had US$ denominated intra-group borrowings from Skyland (BVI) and the Company. The
intra-group borrowing is approximately US$21,629,000 (2024: US$20,898,000) as at December 31, 2025. The Group is mainly exposed to exchange rate fluctuation of RMB and US$. RMB monetary assets and (liabilities) December 31,December 31, 20252024 US$’000US$’000 Cash and cash equivalents40,65452,146 Term deposits305,884118,246 Trade receivables3,1781,427 Accounts and other payables(11,121)(11,729)
338,595160,090
Based on the above net exposures, and assuming that all other variables remain constant, a 5% (2024: 5%) depreciation/appreciation of the RMB against the US$ would result in an decrease/increase in the Group’s profit for the year of approximately US$14,390,000 (2024: US$6,804,000) for the year ended December 31, 2025. US$ monetary assets and (liabilities) December 31,December 31, 20252024 US$’000US$’000 Cash and cash equivalents–3 Inter-company loans(21,629)(20,898)
(21,629)(20,895)
Based on the above net exposures, and assuming that all other variables remain constant, a 5% (2024: 5%)
depreciation/appreciation of the US$ against the RMB would result in an increase/decrease in the Group’s
profit for the year of approximately US$984,000 (2024: US$951,000) for the year ended December 31, 2025.
In the Management’s opinion, the sensitivity analysis is unrepresentative of the inherent foreign exchange risk
as the year end exposure does not reflect the exposure during the year.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 107 -
- FINANCIAL INSTRUMENTS (Cont’d) (b) Interest rate risk Interest rate risk is the risk that the fair value in relation to term deposits, borrowings, entrusted loan payables and lease liabilities bearing fixed interest rate or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. December 31,December 31, 20252024 US$’000US$’000 Term deposits305,884118,246 Borrowings with fixed interest rates(82,518)(80,686) Entrusted loan payables(28,454)(27,823) Lease liabilities(14,045)(928)
Net carrying amounts180,8678,809
The Group is exposed to cash flow interest rate risk on the variable rate bank balances and restricted balances
and variable-rate bank borrowings (see note 25 for details of these borrowings).
Sensitivity analysis
The following analysis is prepared assuming the variable rate bank balances and restricted balances and variable-
rate bank borrowings outstanding at the end of the reporting period were outstanding for the whole year and
all other variables were held constant. A 25 basis point (2024: 25 basis points) increase or decrease is used
when reporting interest rate risk internally to key management personnel and represents the Management’s
assessment of the reasonably possible change in interest rates.
December 31,December 31,
20252024
US$’000US$’000
Cash and cash equivalents399,402183,779
Restricted bank balances34,16266,698
Borrowings with variable interest rates(422,467)(633,666)
Net carrying amounts11,097(383,189)
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 108 -
- FINANCIAL INSTRUMENTS (Cont’d) (b) Interest rate risk (Cont’d) Sensitivity analysis (Cont’d) The analysis below reflects the sensitivity that the interest rate may be higher/lower by 25 basis points (2024: 25 basis points). Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 25 basis points (2024: 25 basis points) higher – Increase/(decrease) in profit for the year11(692) – Addition in finance costs capitalised7336
25 basis points (2024: 25 basis points) lower – (Decrease)/increase in profit for the year(11)692 – Reduction in finance costs capitalised(73)(36)
The Group monitors interest rate exposure and will consider hedging significant interest rate exposure should
the need arise.
(c) Other price risk
The Group is exposed to equity price risk through its investments in equity securities listed in Hong Kong.
The Group’s equity price risk is mainly concentrated on equity instruments operating in the mining industry
sector quoted on the Stock Exchange. In addition, the Group also invested in unquoted equity securities for
investees operating in the chemical and public utility industries for long term strategic purposes which had
been designated as FVTOCI. The Group has formed a team led by the Chief Financial Officer to monitor the
price risk and will consider hedging the risk exposure should the need arise.
Sensitivity analysis
The sensitivity analyses below have been determined based on the exposure to equity price risk at the
reporting date. No sensitivity analysis is presented for unlisted investments as the directors of the Company
consider the amounts of unlisted investments to be insignificant. If the prices of the respective listed equity
instruments had been 10% (2024: 10%) higher/lower, investments revaluation reserve would increase/decrease
by US$13,368,000 (2024: US$4,760,000) for the Group as a result of the changes in fair value of listed
investment at FVTOCI.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 109 -
- FINANCIAL INSTRUMENTS (Cont’d)
(d) Credit risk and impairment assessment
Credit risk is the risk of an unexpected loss if a customer or third party to a financial asset fails to meet its
contractual obligations. The Group sold approximately 100% (2024: 100%) of its gold to one creditworthy
customer, CNG, and approximately 100% (2024: 99%) of its copper and other by-product to CNG subsidiaries for the year ended December 31, 2025. The failure of these customers to make required payments could have a negative impact on the Group’s results. The Group manages this risk by demanding upfront payment for
sales of copper and other by-products and has set up monitoring procedures to ensure that follow-up action is taken for timely settlement of receivables from CNG, the CNG subsidiary and third-party customers. The Group reviews the recoverable amount of each individual trade debt at the end of the reporting period to ensure the adequate impairment losses are made for irrecoverable amounts. In addition, the Group performs impairment assessments using the ECL model on trade balances individually. In this regard, Management considers the
Group’s credit risk is significantly reduced. The Group does not hold any collateral over these balances. The Group applies the simplified approach to provide for ECL on trade receivables as permitted and prescribed by IFRS 9. The Management assessed the ECL on trade receivables individually. Based on the historical experience of
the Group, these trade receivables are generally recoverable due to the long term/on-going relationship and
good repayment record. As at December 31, 2025, included in the Group’s trade receivables balance are debtors with aggregate carrying amount of US$809,000 (2024: US$1,068,000) which are past due over 90 days as at the reporting date. The directors of the Company are of the opinion that no default has occurred for the past due balances and the
balances are still considered fully recoverable due to long-term/on-going relationships and good repayment
records from these customers. Movement in the allowance for credit losses of trade receivables: December 31,December 31, 20252024 US$’000US$’000 At January 1180105 Recognised of expected credit losses16478 Exchange realignment–(3)
At December 31344180
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 110 -
- FINANCIAL INSTRUMENTS (Cont’d)
(d) Credit risk and impairment assessment (Cont’d)
The Group was also exposed to credit risk on amount due from related parties and other receivables. The
Management periodically monitors the financial position of each of the related companies to ensure each
related company is financially viable to settle the amount due to the Group. The Management makes individual assessment on the recoverability of other receivables based on historical settlement records and past experience. The directors of the Company believe that there is no material credit risk inherent in the Group’s outstanding balance of other receivables except the receivable of the Tax and Other Surcharge, of which the impairment assessment has been disclosed in note 15. The Group’s bank deposits and restricted balances are held in PRC and Canadian financial institutions with
high credit ratings, where the credit risks on these bank deposits are limited. The Group had concentration of credit risk by geographical locations as the financial assets at amortised cost comprise various debtors which are located in the PRC for the years ended December 31, 2025 and 2024. Other than the concentration of balance with CNG and its subsidiaries, the Group does not have any other
significant concentration of credit risk. (e) Liquidity risk The Group operates in a capital intensive industry. The Group’s liquidity requirements arise principally from
the need for financing the expansion of its mining and processing operations. Liquidity risk is the risk that the Group will not be able to meet its financial obligations as they fall due. The
Group manages liquidity risk through the management of its capital structure and financial leverage as outlined in note 32. The Group manages its liquidity primarily through maintaining an adequate level of cash and cash equivalents and borrowings. In the management of the liquidity risk, the Group monitors and maintains a level of cash and cash equivalents deemed adequate by the management to finance the Group’s operations and mitigate the effects of fluctuations in cash flows. The Management monitors the utilisation of borrowings and ensures compliance with loan covenants. The Group relies on borrowings as a significant source of liquidity, details of which are set out in note 25. The following table details the Group’s remaining contractual maturities for its financial liabilities. The table is based on the undiscounted cash flows of financial liabilities based on the earliest date on which the Group
can be required to satisfy the liabilities. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 111 -
- FINANCIAL INSTRUMENTS (Cont’d) (e) Liquidity risk (Cont’d) To the extent that interest flows are floating rate, the undiscounted amount is derived from interest rate at the end of the reporting period: WeightedTotal averageWithin1 – 22 – 5Over 5undiscountedCarrying interest rate1 yearyearsyearsyearscash flowamount %US$’000US$’000US$’000US$’000US$’000US$’000 At December 31, 2025 Accounts and other payables163,2968,72317,446–189,465188,140 Entrusted loan payable2.4529,148–––29,14828,454 Borrowings2.51223,763112,941118,80170,426525,931504,985 Lease liabilities6.391,4349452,74631,04536,17014,045
417,641122,609138,993101,471780,714735,624
Weighted Total averageWithin1 – 22 – 5Over 5undiscountedCarrying interest rate1 yearyearsyearsyearscash flowamount %US$’000US$’000US$’000US$’000US$’000US$’000 At December 31, 2024 Accounts and other payables162,0698,52925,588–196,186194,174 Entrusted loan payable2.4569128,522––29,21327,823 Borrowings2.49162,589266,478223,395101,203753,665714,352 Lease liabilities4.67510479––989928
325,859304,008248,983101,203980,053937,277
(f) Fair value
The following table presents the fair value of the Group’s financial instruments measured at the end of the
reporting period on a recurring basis, categorised into the three-level fair value hierarchy as defined in HKFRS
13, Fair value measurement. The level into which a fair value measurement is classified is determined with
reference to the observability and significance of the inputs used in the valuation technique as follows:
Level 1: Fair value measured using only Level 1 inputs i.e. unadjusted quoted prices in active markets for
identical assets or liabilities at the measurement date
Level 2: Fair value measured using Level 2 inputs i.e. observable inputs which fail to meet Level 1, and not
using significant unobservable inputs. Unobservable inputs are inputs for which market data are
not available
Level 3: Fair value measured using significant unobservable inputs
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 112 -
-
FINANCIAL INSTRUMENTS (Cont’d) (f) Fair value (Cont’d) Equity instruments at FVTOCI – listed equity securities and unlisted equity securities are measured at fair value based on the quoted bid price in an active market (Level 1) and the discounted cash flow models (Level 3)
respectively. The fair values of the unlisted equity securities are considered insignificant. The fair values of
other financial assets and financial liabilities measured at amortised cost are determined in accordance with
generally accepted pricing models based on discounted cash flow analysis. Other non-current assets – recoverable amounts of other non-current assets are measured at fair value less
costs of disposal. The fair value measurement are determined using residual method under market approach. The key inputs were the forecast selling prices for the completed shops and apartments, and the estimated
cost to complete and decorate the building. The forecast selling price and the estimated cost to complete are positively related and inversely related to the fair value, respectively. The Group considers that the carrying amounts of financial assets and financial liabilities recorded at amortised cost in the consolidated financial statements approximate their fair values. There was no transfer amongst level 1, 2 and 3 in the current and prior years. -
COMMITMENTS December 31,December 31, 20252024 US$’000US$’000 Capital expenditure in respect of acquisition of property, plant and equipment in the consolidated financial statements – contracted but not provided for9,4686,113
-
RETIREMENT BENEFITS SCHEMES The employees of the Group’s subsidiaries are members of a state-managed retirement benefits scheme operated by the PRC government. The subsidiaries are required to contribute a certain percentage of payroll cost to the retirement benefits scheme to fund the benefits. The only obligation of the Group with respect to the retirement benefits scheme is to make the specified contributions. The total cost charged to the consolidated statement of profit or loss and other comprehensive income of approximately US$9,953,000 for the year ended December 31, 2025 (2024: US$8,140,000), represent contributions payable to
the scheme by the Group. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 113 -
- RECONCILIATION OF LIABILITIES ARISING FROM FINANCING ACTIVITIES
The table below details changes in the Group’ liabilities arising from financing activities, including both cash and
non-cash changes. Liabilities arising from financing activities are those for which cash flows were, or future cash
flows will be, classified in the Group’s consolidated statement of cash flows as cash flows from financing activities. Entrusted loanLeaseDividend BorrowingspayableliabilitiespayablesTotal US$’000US$’000US$’000US$’000US$’000 (note 25)(note 26)(note 27) At January 1, 2025714,35227,823928–743,103 Financing cash flows(220,219)–(514)(32,952)(253,685) Dividend declared by the Company–––31,71331,713 Dividend declared by subsidiaries of the Company–––1,2391,239 Exchange difference arising
on translation10,85263119911,682 Accrued interest expenses––848–848 Non-cash transactions––12,584–12,584
At December 31, 2025504,98528,45414,045–547,484
Entrusted loanLeaseDividend
BorrowingspayableliabilitiespayablesTotal
US$’000US$’000US$’000US$’000US$’000
(note 25)(note 26)(note 27)
At January 1, 2024738,23428,2381,477–767,949
Financing cash flows(14,322)–(599)(1,250)(16,171)
Dividend declared by
subsidiaries of the Company–––1,2501,250
Exchange difference arising
on translation(9,560)(415)––(9,975)
Unrealised foreign exchange
loss, net––(16)–(16)
Accrued interest expenses––66–66
At December 31, 2024714,35227,823928–743,103
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 114 -
- PARTICULARS OF SUBSIDIARIES Details of the Company’s subsidiaries at December 31, 2025 and 2024 are as follows: Place and dateIssued and fullyEquity interest of incorporation/Place ofpaid share capital/attributable to the Group Name of subsidiariesestablishmentoperationregistered capitalas at December 31,Principal activities 20252024 Pacific PGM Inc.British Virgin Islands
(“BVI”)
May 17, 2001
BVIUS$100100%100%Investment holding
Pacific PGM (Barbados) Inc.Barbados
September 6, 2007
BarbadosUS$250,000100%100%Investment holding
IMP
(1)
PRC
April 29, 2002
PRCUS$45,000,00096.5%96.5%Engaged in exploration and
development of mining
properties in China
Skyland Mining LimitedBarbados
October 6, 2004
BarbadosUS$233,380,700
plus RMB1,510,549,032
100%100%Investment holding
Jia Ertong
(1)
PRC
October 31, 2003
PRCUS$273,920,000100%100%Exploration, development and
mining of mineral properties
and investment holding
Huatailong
(1)
PRC
January 11, 2007
PRCRMB1,760,000,000100%100%Exploration, development and
mining of mineral properties
Jiama Industry and Trade
(1)
PRC
December 1, 2011
PRCRMB5,000,00051%51%Mining logistics and transport
business
Skyland (BVI)
(2)
BVI
October 26, 2010
BVIUS$1n/a100%Issue of bonds
(1)
Domestic limited liability company.
(2)
On November 5, 2024, the dissolution of Skyland (BVI) was approved by the official department and the final dissolution was
completed on February 5, 2025.
None of the subsidiaries had issued any debt securities at the end of both years. Other than Pacific PGM Inc. and
Pacific PGM (Barbados) Inc. (2024: Pacific PGM Inc., Pacific PGM (Barbados) Inc. and Skyland (BVI)) which are
directly held by the Company, all other subsidiaries listed above are indirectly held under the Group.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 115 -
- STATEMENT OF FINANCIAL POSITION OF THE COMPANY December 31,December 31, 20252024 US$’000US$’000 Current assets Cash and cash equivalents20,3034,704 Other receivables10384 Prepaid expenses and deposits7839
20,4844,827
Non-current assets Right-of-use assets18327 Equity instruments at FVTOCI (note 19)133,67847,599 Investments in subsidiaries (note 37)987,015987,016
1,120,8761,034,642
Total assets1,141,3601,039,469
Current liabilities Other payable and accrued expenses2,2432,248 Borrowings79,00079,000 Lease liabilities6132 Amounts due to subsidiaries21,8151,335
103,11982,615
Net current liabilities(82,635)(77,788)
Total assets less current liabilities1,038,241956,854
Non-current liabilities Lease liabilities125– Deferred income–19
12519
Total liabilities103,24482,634
Owners’ equity Share capital (note 29)1,229,0611,229,061 Reserves (note 39)115,84830,384 Accumulated losses (note 39)(306,793)(302,610)
Total owners’ equity1,038,116956,835
Total liabilities and owners’ equity1,141,3601,039,469
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 116 -
- RESERVES AND DEFICITS OF THE COMPANY Accumulated ReserveslossesTotal US$’000US$’000US$’000 At January 1, 202429,113(254,944)(225,831)
Loss for the year–(47,666)(47,666) Fair value gain on equity instruments at FVTOCI1,271–1,271
Total comprehensive income/(loss) for the year1,271(47,666)(46,395)
At December 31, 202430,384(302,610)(272,226)
Loss for the year–27,53027,530 Fair value gain on equity instruments at FVTOCI85,464–85,464 Dividend paid to shareholders–(31,713)(31,713)
Total comprehensive income/(loss) for the year85,464(4,183)81,281
At December 31, 2025115,848(306,793)(190,945)
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
-
117 -
-
118 - FIVE-YEAR FINANCIAL SUMMARY The consolidated results and assets and liabilities of the Group for the last five financial years, as extracted from the
audited financial statements are as follows: Year ended December 31 20252024202320222021 US$’000US$’000US$’000US$’000US$’000 RESULTS Revenue1,310,125756,646459,4341,104,9491,137,356
Profit (loss) attributable to owners of the Company467,09362,732(25,500)222,743267,361
At December 31 20252024202320222021 US$’000US$’000US$’000US$’000US$’000 ASSETS AND LIABILITIES Total assets3,356,5352,935,9792,834,7163,194,9113,257,043 Total liabilities(1,019,509)(1,149,773)(1,106,975)(1,291,481)(1,423,651)
Net assets2,337,0261,786,2061,727,7411,903,4301,833,392
Equity attributable to owners of the Company2,309,1411,762,4381,706,8581,883,9791,815,922 Non-controlling interests27,88523,76820,88319,45117,470
Total owners’ equity2,337,0261,786,2061,727,7411,903,4301,833,392
CORPORATE GOVERNANCE
The Company has complied with the code provisions under the Code on Corporate Governance Practices
(the “Code”) set out in Appendix C1 to the Rules Governing the Listing of Securities on the Stock
Exchange of Hong Kong Limited (the “Listing Rules”) during the year ended December 31, 2025.
MODEL CODE FOR SECURITIES TRANSACTIONS
The Company has adopted policies in its Corporate Disclosure, Confidentiality and Securities Trading
Policy that has terms which are no less exacting than those set out in Appendix C3 to the Listing Rules
(the “Model Code”). The Board is pleased to confirm, after specific enquiries with all Directors, that
all Directors have fully complied with standards required according to the Model Code during the year
ended December 31, 2025.
PURCHASE, SALE OR REDEMPTION OF THE COMPANY’S LISTED SECURITIES
For the year ended December 31, 2025, neither the Company nor any of its subsidiaries has purchased,
sold or redeemed any of the Company’s listed securities.
AUDIT COMMITTEE
Pursuant to the requirements of the Code and the Listing Rules, the Company has established an audit
committee (the “Audit Committee”) comprising all the existing Independent Non-executive Directors,
namely Mr. Yingbin Ian He,(Chairman of the Audit Committee), Mr. Wei Shao, Mr. Bielin Shi, and
Ms. Ruixia Han.
The Audit Committee has reviewed the audited consolidated financial statements for the year ended
December 31, 2025, and is of the view that the Group’s audited consolidated financial statements for
the year ended December 31, 2025 are prepared in accordance with the applicable accounting standard,
laws and regulations, and appropriate disclosures have already been made.
By Order of the Board
China Gold International Resources Corp. Ltd.
Mr. Chenguang Hou
Chairman and Chief Executive Officer
Hong Kong, March 31, 2026
As at the date of this announcement, the Board of Directors of the Company comprises of Mr Chenguang
Hou, Mr. Yuanhui Fu, and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non-Executive
Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Mr. Bielin Shi, and Ms. Ruixia (Rane) Han as
Independent Non-executive Directors.
- 119 -
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock Code: 2099)
(Toronto Stock Code: CGG)
RESULTS ANNOUNCEMENT
FOR THE YEAR ENDED DECEMBER 31, 2025
FINANCIAL HIGHLIGHTS
For the Year ended December 31,
20252024
US$’000US$’000
Revenues1,310,125756,646
Net profit472,31565,298
Basic earnings per share (cents)117.8015.82
Diluted earnings(loss) per share (cents)N/AN/A
Net cash flows from operations709,984306,896
Property, plant and equipment1,339,4471,375,498
Property, plant and equipment capital expenditures50,13648,286
Cash and cash equivalents399,402183,779
Working capital580,005326,988
RESULTS
The board of directors (the“Board”) of China Gold International Resources Corp. Ltd. (the “Company”
together with its subsidiaries, referred hereto as the “Group”) is pleased to announce the audited
consolidated results of the Group for the year ended December 31, 2025 with comparative figures for
the comparable period in 2024, as follows:
- 1 -
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 2 -
The following Management Discussion and Analysis of financial condition and results of operations (“MD&A”) is prepared
as of March 30, 2026. It should be read in conjunction with the consolidated financial statements and notes thereto of
China Gold International Resources Corp. Ltd. (referred to herein as “China Gold International”, the “Company”, “we”
or “our” as the context may require) for the three months and year ended December 31, 2025 and the three months
and year ended December 31, 2024, respectively. Unless the context otherwise provides, references in this MD&A to
China Gold International or the Company refer to China Gold International and each of its subsidiaries collectively on a
consolidated basis. The following discussion contains certain forward-looking statements relating to the Company’s plans, objectives, expectations and intentions, which are based on the Company’s current expectations and are subject to risks, uncertainties and changes in circumstances. Readers should carefully consider all of the information set out in this MD&A, including the risks and uncertainties outlined further in the Company’s Annual Information Form (“Annual Information Form” or “AIF”) dated
March 30, 2026 on SEDAR+ at www.sedarplus.ca, www.chinagoldintl.com and www.hkex.com.hk. For further information on risks and other factors that could affect the accuracy of forward-looking statements and the result of operations of the Company, please refer to the sections titled “Forward-Looking Statements” and “Risk Factors” and to discussions elsewhere within this MD&A. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 3 -
FORWARD-LOOKING STATEMENTS
Certain statements made herein, other than statements of historical fact relating to the Company, represent forward-looking
information. In some cases, this forward-looking information can be identified by words or phrases such as “may”, “will”,
“expect”, “anticipate”, “contemplates”, “aim”, “estimate”, “intend”, “plan”, “believe”, “potential”, “continue”, “is/are likely
to”, “should” or the negative of these terms, or other similar expressions intended to identify forward-looking information.
This forward-looking information includes, among other things; China Gold International’s production estimates, business
strategies and capital expenditure plans; the development and expansion plans and schedules for the CSH Mine and
the Jiama Mine; China Gold International’s financial condition; the regulatory environment as well as the general industry outlook; general economic trends in China; and statements respecting anticipated business activities, planned expenditures, corporate strategies, participation in projects and financing, and other statements that are not historical facts. By their nature, forward-looking information involves numerous assumptions, both general and specific, which may cause the actual results, performance or achievements of China Gold International and/or its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward–looking information. Some of the key assumptions include, among others, the absence of any material change in China Gold International’s operations or in foreign exchange rates, the prevailing price of gold, copper and other non-ferrous metal products; the absence of lower- than-anticipated mineral recovery or other production problems; effective income and other tax rates and other assumptions underlying China Gold International’s financial performance as stated in the Company’s technical reports for its CSH Mine and Jiama Mine; China Gold International’s ability to obtain regulatory confirmations and approvals on a timely basis;
continuing positive labor relations; the absence of any material adverse effects as a result of political instability, terrorism, natural disasters, pandemics such as COVID-19, litigation or arbitration and adverse changes in government regulation;
the availability and accessibility of financing to China Gold International; and the performance by counterparties of the
terms and conditions of all contracts to which China Gold International and its subsidiaries are a party. The forward-looking information is also based on the assumption that none of the risk factors identified in this MD&A or in the AIF that could cause actual results to differ materially from the forward-looking information actually occurs. Forward-looking information contained herein as of the date of this MD&A is based on the opinions, estimates and
assumptions of management. There are a number of important risks, uncertainties and other factors that could cause
actual actions, events or results to differ materially from those described as forward-looking information. China Gold
International disclaims any obligation to update any forward-looking information, whether as a result of new information, estimates, opinions or assumptions, future events or results, or otherwise except to the extent required by law. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking information in this MD&A is expressly qualified by this cautionary statement. The reader is cautioned not to place undue reliance on forward-looking information.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 4 -
THE COMPANY
Overview
China Gold International is a gold and base metal mining company registered in British Columbia, Canada. The Company’s
main business involves the operation, acquisition, development and exploration of gold and base metal properties.
The Company’s principal mining operations are the Chang Shan Hao Gold Mine (“CSH Mine” or “CSH”), located in Inner
Mongolia, China and the Jiama Copper-Gold Polymetallic Mine (“Jiama Mine” or “Jiama”), located in Tibet, China. China
Gold International holds a 96.5% interest in the CSH Mine, while its Chinese joint venture (“CJV”) partner holds the
remaining 3.5% interest. The Company owns a 100% interest in the Jiama Mine, which hosts a large scale copper-gold polymetallic deposit containing copper, gold, molybdenum, silver, lead and zinc metals. China Gold International’s common shares are listed on the Toronto Stock Exchange (“TSX”) and The Stock Exchange of Hong Kong Limited (“HKSE”) under the symbol CGG and the stock code 2099, respectively. Additional information about the Company, including the Company’s Annual Information Form, is available on SEDAR+ at sedarplus.ca as well as Hong Kong Exchange News at hkexnews.hk.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 5 - Performance Highlights Three months ended December 31, 2025 • Revenue increased by 31% to US$384.7 million from US$293.6 million for the same period in 2024. • Mine operating earnings of US$209.9 million, increased by US$87.7 million from mine operating earnings of US$122.2 million for the same period in 2024. • Net profit of US$127.7 million increased by US$59.4 million from US$68.3 million for the same period in 2024. • Cash flow from operation of US$140.4 million, increased from US$62.7 million for the same period in 2024. • Total gold production decreased by 21% to 47,875 ounces from 60,406 ounces for the same period in 2024. • Total copper production was 37.0 million pounds (approximately 16,756 tonnes) a decrease from 44.1 million pounds (approximately 20,020 tonnes) for the same period in 2024.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 6 - Year ended December 31, 2025 • Revenue increased by 73% to US$1,310.1 million from US$756.6 million for the same period in 2024. • Mine operating earnings of US$684.0 million, increased by US$497.1 million from US$186.9 million for the same period in 2024. • Net profit of US$472.3 million increased by US$407.0 million from US$65.3 million for the same period in 2024. • Cash flow from operation of US$710.0 million, increased from US$306.9 million for the same period in 2024. • Total gold production increased by 9% to 177,225 ounces from 162,652 ounces for the same period in 2024. • Total copper production was 156.3 million pounds (approximately 70,883 tonnes) a 48% increase from 105.7 million pounds (approximately 47,929 tonnes) for the same period in 2024. Selected Annual Information* Year ended December 31 20252024202320222021
US$ Millions except for per share Total revenue1,3107574591,1051,137 Income from operations59012332317333 Net profit (loss)47265(23)225269 Basic earnings (loss) per share (cents)117.8015.82(6.43)56.1967.44 Diluted earnings (loss) per share (cents)N/AN/AN/AN/AN/A Total assets3,3572,9362,8353,1953,257 Total non-current liabilities5558098026531,080
- Prepared under IFRS
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 7 -
OUTLOOK
After the repairs and reinforcements of the overflow of the Guolanggou Tailings Dam, the Government of Tibet Autonomous
Region and relevant departments of the central government approved the resumption of Jiama’s operations on May 30,
2024, with a daily processing capacity of 34,000 tonnes, which is lower than the design processing capacity. The Company is actively advancing the construction of the Phase III tailings pond, which is expected to be completed and put into
operation in the first half of 2027. The total daily processing capacity is anticipated to increase to 44,000 tpd once the
Phase III tailings pond is in operation. The open-pit operations at the CSH gold mine are nearing the end of its mine life. With the CSH pit’s increased depth, the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. Ensuring slope stability and avoiding systematic risks at this stage are the Company’s top priority to ensure safe and sustainable production. Inconsideration of the events, the Company reports separate production guidance for the two mines in 2026. CSH Mine: • The total gold production is estimated between 70,732 ounces (2.2 tonnes) and 83,592 ounces (2.6 tonnes). Jiama Mine: • The copper production will be approximately between 140 million pounds (63,500 tonnes) and 149 million pounds (67,500 tonnes); • The gold production will be approximately between 70,732 ounces (2.2 tonnes) and 75,554 ounces (2.35 tonnes); • The silver production will be approximately between 4.18 million ounces (130 tonnes) and 4.82 million ounces (150 tonnes);.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 8 -
Outline of the Long-Term Development Plan for the Jiama Mine
In 2024, the Company successfully restored stable operation at the Jiama Mine. In addition, the Company continued to
focus its efforts on optimizing resource utilization plan, integrating the identified high-grade underground resources, and
accelerating the exploration work at high potential zones. The long-term development plan for the Jiama Mine consists
of three phases: • Prior to the completion of the construction of the new tailings storage facility (the “Youlongbu tailings storage facility”), the Jiama Mine Phase II processing plant will maintain and operate at its current processing capacity of 34,000 tons per day to match the Guolanggou’s storage capacity (the operation of Phase I processing plant has been suspended since May 2024). • The Youlongbu tailings storage facility is scheduled to commence operation in 2027, allowing a further increase in the Jiama Mine’s production capacity. Over the next two years, as part of the underground resource integration plan, the Company plans to apply to increase the permitted capacity on its mining license for the Jiama Mine, subject
to compliance with the relevant safety requirements. Currently, the permitted capacity on the mining license of the Jiama Mine is 14.4 million tonnes per year (approximately 44,000 tonnes per day based on 330 operating days per year). Subject to the government approval of an increased annual mining rate, and following the commissioning of Youlongbu tailings storage facility, the Jiama Mine’s ore processing volume will return to the level of 50,000 tonnes per day, in line with the designed processing capacity of the processing plants. In addition, endeavors are underway so that the production levels at the Jiama Mine will restore to those before the Guolanggou tailings overflow through blending of high-grade underground ores. • The Company is also working to delineate new resources at satellite deposits near the Jiama Mine. The Company has been actively conducting geological exploration work in two areas: the Bayi Ranch and the Zegulang North, both of which have shown significant resource potential. The Company will provide an update on the exploration progress
and results in due course. Subject to the final exploration outcomes and feasibility studies on resource development, the Company will formulate a comprehensive expansion plan for the Jiama Mine area. This study has already been initiated at a preliminary stage.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 9 - RESULTS OF OPERATIONS Selected Quarterly Financial Data Quarter ended 20252024 (US$ in thousands except per share)31-Dec30-Sep30-Jun31-Mar31-Dec30-Sep30-Jun31-Mar
Revenue384,734345,026307,269273,096293,567254,581147,95560,543 Cost of sales174,826147,993147,872155,444171,413207,762118,51272,039 Mine operating earnings (loss)209,908197,033159,397117,653122,15446,81929,443(11,496) General and administrative expenses21,45014,18412,06812,23217,8779,94410,6499,096 Exploration and evaluation expenditures268224133508247495092 Research and development expenses16,3997,8485,2563,2968,1184,7042,113787 Income (loss) from operations171,791174,777141,940101,61795,91232,12216,631(21,471) Foreign exchange gain (loss)7,381(3,039)(2,037)(2,654)(4,631)2,670(443)(157) Finance costs4,5114,7114,5805,0025,3135,6925,7225,663 Profit (loss) before income tax171,694153,450139,25295,77085,54030,1663,924(26,410) Income tax expense (credit)43.99411,15622,9099,79117,2232,2938,768(362) Net profit (loss)127,699142,294116,34385,97968,31727,873(4,844)(26,048) Basic earnings (loss) per share (cents)31.6735.6029.0821.4516.976.84(1.36)(6.63) Diluted earnings per share (cents)N/AN/AN/AN/AN/AN/AN/AN/A
Selected Quarterly and Annual Production Data and Analysis CSH MineThree months ended December 31,Year ended December 31, 2025202420252024
Gold sales (US$ million)98.2178.80338.47246.95 Realized average price (US$) of gold per ounce4,1242,6593,4192,453 Gold produced (ounces)28,68436,71996,816108,188 Gold sold (ounces)23,81429,64199,010100,682 Total production cost (US$ per ounce)1,7471,7211,6651,645 Cash production cost (1) (US$ per ounce)1,5211,3061,2631,064
(1) Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A
Gold production at the CSH Mine decreased by 22% to 28,684 ounces for the three months ended December 31, 2025
compared to 36,719 ounces for the same period in 2024. The total production cost of gold for the three months ended
December 31, 2025 increased to US$1,747 per ounce compared to US$1,721 for the same period in 2024. The cash
production cost of gold for the three months ended December 31, 2025 increased to US$1,521 per ounce from US$1,306
for the same period in 2024. The increase in Cash production cost is mainly due to the increase in environment protection
fees.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 10 - Jiama MineThree months ended December 31,Year ended December 31, 2025202420252024
Copper sales (US$ in millions)148.99106.16495.56283.22 Realized average price 1 (US$) of copper per pound after smelting fee discount3.802.423.172.71 Copper produced (tonnes)16,75620,02070,88347,929 Copper produced (pounds)36,939,25744,135,873156,269,659105,664,184 Copper sold (tonnes)17,65219,93170,95947,421 Copper sold (pounds)38,917,01043,940,061156,437,873104,545,457 Gold produced (ounces)19,19123,68880,40954,464 Gold sold (ounces)20,19523,52080,40653,963 Silver produced (ounces)1,275,1431,479,7085,645,9153,231,408 Silver sold (ounces)1,346,9561,473,0275,648,6313,193,073 Lead produced (tonnes)7,97313,50340,91227,896 Lead produced (pounds)17,577,96829,768,12890,196,25761,500,340 Lead sold (tonnes)8,45113,36041,03627,493 Lead sold (pounds)18,632,14329,453,69790,468,42360,612,685 Zinc produced (tonnes)5,2486,57523,44614,663 Zinc produced (pounds)11,569,32114,495,12151,688,42932,326,595 Zinc sold (tonnes)5,5366,47923,55614,442 Zinc sold (pounds)12,205,51314,282,87851,932,90431,839,913 Moly produced (tonnes)138120768354 Moly produced (pounds)303,944264,7531,692,167780,704 Moly sold (tonnes)134234840234 Moly sold (pounds)295,027515,2171,851,486515,217 Total production cost 2 (US$) of copper per pound4.363.313.524.44 Total production cost 2 (US$) of copper per pound after by-products credits 4 0.880.890.522.32 Cash production cost 4 (US$) per pound of copper3.632.652.743.62 Cash production cost 3 (US$) of copper per pound after by-products credits 4 0.140.23(0.26)1.50
1 A discount factor of 11.9% to 25.3% is applied to the copper benchmark price to compensate the refinery costs incurred by the buyers. The
discount factor is higher if the grade of copper in copper concentrate is below 18%. The industry standard of copper in copper concentrate
is between 18-20%.
2 Production costs include expenditures incurred at the mine sites for the activities related to production including mining, processing, mine
site G&A and royalties etc.
3 Non-IFRS measure. See ‘Non-IFRS measures’ section of this MD&A
4 By-products credit refers to the sales of gold, silver, lead, zinc and moly during the corresponding period.
5 Increased production of by-products combined with reduced G&A and R&D costs, has resulted in by-product credits exceeding total
production cost of copper.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 11 -
During the three months ended December 31, 2025, The Jiama Mine produced 16,756 tonnes (approximately 37.0 million
pounds) of copper, which decreased from of 20,020 tonnes (approximately 44.1 million pounds) during the comparative
three month period in 2024.
Total production cost of copper per pound increased by 32% due to lower copper grade and increase of R&D in the
three months of 2025 as compared to the same period in 2024. Cash production cost of copper per pound increased as compared to the same quarter in 2024. However, total production cost of copper per pound after by-products and cash production cost of copper per pound after by-product decreased in 2025 as compared to the same three month period in 2024, mainly due to higher by-product revenue from gold and silver. Review of Quarterly and Annual Data Three months ended December 31, 2025 compared to three months ended December 31, 2024 Revenue of US$384.7 million for the fourth quarter of 2025, increased by US$91.1 million from US$293.6 million for the same period in 2024. Revenue from the CSH Mine was US$98.2 million, an increase of US$19.4 million from US$78.8 million for the same
period in 2024. The realized average gold price increased by 55%, from US$2,659/oz in Q4 2024 to US$4,124/oz in Q4
- Gold sold by the CSH Mine was 23,814 ounces (gold produced: 28,684 ounces), compared to 29,641 ounces (gold
produced: 36,719 ounces) for the same period in 2024.
Revenue from the Jiama Mine was US$286.5 million, an increase of US$71.7 million, compared to US$214.8 million
for the same period in 2024. The realized average price of copper increased by 57%, from US$2.42/pound in Q4 2024 to US$3.80/pound in Q4 2025. Total copper sold was 17,652 tonnes (38.9 million pounds) for the three months ended December 31, 2025, a decrease of 11% from 19,931 tonnes (43.9 million pounds) for the same period in 2024. Cost of sales of US$174.8 million for the quarter ended December 31, 2025, a slightly increase of US$3.4 million from
US$171.4 million for the same period in 2024. Cost of sales as a percentage of revenue for the Company decreased from 58% to 45% for the three months ended December 31, 2024 and 2025, respectively. Cost of sales was impacted by
many operation factors such as grade of ore, recovery rates and stripping ratio. Refer to the sections below for details of production factors for each individual mine. Mine operating earnings of US$209.9 million for the three months ended December 31, 2025, an increase of US$87.7
million from US$122.2 million for the same period in 2024. General and administrative expenses increased by US$3.5 million, from US$17.9 million for the quarter ended December 31, 2024 to US$21.4 million for the quarter ended December 31, 2025, partially due to higher taxes and surcharges
resulting from increased revenue in the current quarter. Research and development expenses of US$16.4 million for the three months ended December 31, 2025, increased
from US$8.1 million for the comparative 2024 period. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes. Income from operations of US$171.8 million for the fourth quarter of 2025, increased by US$75.9 million, compared to
US$95.9 million for the same period in 2024. Foreign exchange gain of US$7.4 million for the three months ended December 31, 2025, increased from a loss of US$4.6 million for the same period in 2024. The gain was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 12 -
Interest and other income of US$2.4 million for the three months ended December 31, 2025, increased from a negative
US$0.1 million for the same period in 2024, primarily due to higher interest income earned during the current quarter
compared to the corresponding period last year. Finance costs of US$4.5 million for the three months ended December 31, 2025, decreased by US$0.8 million compared to US$5.3 million for the same period in 2024. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Other expense of US$5.3 million for the three months ended December 31, 2025, increased from US$0.3 million for the same period in 2024. During the current quarter, the Company recognized an impairment loss of U$5.9 million on other non-current assets based on a third-party real estate valuation report, partially offset by lower expenses in other categories. Refer to Note 22 Other non-current assets of the consolidated financial statements for details. Income tax expense of US$44.0 million for the three months ended December 31, 2025, increased by US$26.8 million
from US$17.2 million for the comparative period in 2024. In December 2025, the Company accrued US$23.5 million in withholding tax on declared dividends to shareholders. During the current quarter, the Company had US$25.0 million of deferred tax expense compared to US$9.1 million deferred tax credit for the same period in 2024. Net income of US$127.7 million for the three months ended December 31, 2025, increased by US$59.4 million from
US$68.3 million for the three months ended December 31, 2024. Year ended December 31, 2025 compared to year ended December 31, 2024 Revenue of US$1,310.1 million for the year ended December 31, 2025, increased by US$553.5 million from US$756.6
million for the same period in 2024. Revenue from the CSH Mine was US$338.5 million, an increase of US$91.6 million from US$246.9 million for the same period in 2024. The realized average gold price increased by 39%, from US$2,453/oz in 2024 to US$3,419/oz in the same period of 2025. Gold sold by the CSH Mine was 99,010 ounces (gold produced: 96,816 ounces), compared to 100,682 ounces (gold produced: 108,188 ounces) for the same period in 2024. Revenue from the Jiama Mine was US$971.7 million, an increase of US$462.0 million, compared to US$509.7 million
for the same period in 2024. The realized average price of copper increased by 17%, from US$2.71/pound in 2024 to
US$3.17/pound in the same period of 2025. Total copper sold was 70,959 tonnes (156.4 million pounds) for the year
ended December 31, 2025, an increase of 50% from 47,421 tonnes (104.5 million pounds) for the same period in 2024. Cost of sales of US$626.1 million for the year ended December 31, 2025, an increase of US$56.4 million from US$569.7 million for the same period in 2024. The cost of sales increased due to the resumption of operations at the Jiama Mine, leading to higher production costs as the Phase II processing plants was reactivated. Mine operating earnings of US$684.0 million for the year ended December 31, 2025, an increase of US$497.1 million
from US$186.9 million for the same period in 2024. General and administrative expenses increased by US$12.3 million, from US$47.6 million for the year ended December
31, 2024 to US$59.9 million for the same period in 2025, primarily driven by higher operational support costs associated with the resumption of production at the Jiama Mine. Research and development expenses of US$32.8 million for the year ended December 31, 2025, increased from US$15.7 million for the comparative 2024 period. The increase was primarily driven by the Company’s research and development efforts focused on improving recovery rates and optimizing processing and mining processes.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 13 -
Income from operations of US$590.1 million for the year ended December 31, 2025, increased by US$466.9 million,
compared to US$123.2 million for the same period in 2024. Foreign exchange loss of US$0.3 million for the year ended December 31, 2025, decreased from US$2.6 million for the same period in 2024. The loss was attributed to changes in the RMB/USD exchange rates and the revaluation of monetary items held in Chinese RMB. Interest and other income of US$11.7 million for the year ended December 31, 2025, increased from US$5.1 million for the same period in 2024, primarily due to higher interest income earned during the current period and higher dividend received from China Nonferrous Mining Corporation Limited compared to the corresponding period last year. Finance costs of US$18.8 million for the year ended December 31, 2025, decreased by US$3.6 million compared to
US$22.4 million for the same period in 2024. The decrease was primarily due to a reduction in total borrowings outstanding. Management continues to monitor the Company’s debt structure and financing costs to optimize capital efficiency. Other expense of US$22.5 million for the year ended December 31, 2025, increased from US$10.1 million for the same period in 2024. During the current period, the Company recognized litigation compensation of US$15.0 million arising
from the litigation between Shaanxi Xiaoshanchuan Mineral Resources Development and Construction Co.,Ltd. and the
Company’s subsidiary, Tibet Huatailong Mining Development Co. Ltd. Refer to Note 31 Contingencies of the consolidated financial statements for details. Income tax expense of US$87.9 million for the year ended December 31, 2025, increased by US$60.0 million from US$27.9 million for the comparative period in 2024. In December 2025, the Company accrued US$23.5 million in withholding
tax on declared dividends to shareholders. During the current period, the Company had US$23.7 million of deferred tax expense compared to a deferred tax expense of US$10.3 million for the same period in 2024. Net income of US$472.3 million for the year ended December 31, 2025, increased by US$407.0 million from US$65.3
million for the same period in 2024. NON-IFRS MEASURES The cash cost of production, cash cost after by-product credits and cash cost per ounce and per pound are measures
that are not in accordance with IFRS. The Company has included these metrics to supplement its consolidated financial statements, which are presented in
accordance with IFRS. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance, operating results or financial condition prepared in accordance with IFRS. The Company has included cash production cost per ounce and
per pound data because it understands that certain investors use this information to determine the Company’s ability to generate earnings and cash flow. The measures are not necessarily indicative of operating results, cash flow from operations, or financial condition as determined under IFRS. The following tables provide a reconciliation of cost of sales to the cash costs of production in total dollars and in dollars per gold ounce for the CSH Mine or per copper pound for the Jiama Mine:
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 14 -
Cash production cost for gold is calculated as total cost of sales adjusted by depreciation and depletion and amortization
of intangible assets. Cash production cost of gold per ounce is calculated as total cash production cost divided by total
gold sold (ounces). CSH Mine (Gold) Three months ended December 31,Year ended December 31, 2025202420252024 US$ US$ Per ounceUS$ US$ Per ounceUS$ US$ Per ounceUS$ US$ Per ounce
Total Cost of sales 1 41,593,1381,74751,018,7071,721164,875,8821,665165,574,0051,645 Adjustment – Depreciation & depletion(5,304,923)(223)(12,164,347)(410)(39,205,424)(396)(57,678,651)(573)
Adjustment – Amortization of
intangible assets(56,998)(2)(163,015)(5)(642,989)(6)(787,919)(8)
Total cash production costs36,231,2171,52238,691,3451,306125,027,4691,263107,107,4351,064
Total Gold sold ounces23,81429,65599,010100,682
Cash production cost of gold US$ per ounce calculated as total cash production cost divided by total gold sold ounces. Cash Production cost for copper is calculated as production costs (total cost of sales adjusted by General and administrative expenses and Research and development expenses) adjusted by depreciation and depletion and amortization of intangible assets. Cash production cost of copper (pounds) is calculated as total cash production cost divided by total copper sold (pounds).
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 15 - Jiama Mine (Copper with by-products credits) Three months ended December 31,Year ended December 31, 2025202420252024 US$ US$ Per PoundUS$ US$ Per PoundUS$ US$ Per PoundUS$ US$ Per Pound
Total Cost of sales133,232,9293.42120,395,1162.74461,258,1442.95404,152,4933.87
General and administrative expenses20,314,0470.5217,020,6250.3955,871,9790.3643,581,8770.42 Research and development expenses16,398,8990.428,118,5950.1832,798,6090.2115,722,0980.15
Total production cost169,945,9754.36145,534,3363.31549,928,7323.52463,456,4684.44
Adjustment – Depreciation & depletion(21,924,108)(0.56)(21,527,256)(0.49)(94,305,794)(0.60)(66,877,508)(0.64)
Adjustment – Amortization of
intangible assets(6,454,180)(0.17)(7,399,660)(0.17)(28,363,980)(0.18)(19,117,739)(0.18)
Total cash production costs141,567,6873.63116,607,4202.65427,258,9582.74377,461,2213.62
By-products credits(135,694,593)(3.49)(106,554,080)(2.42)(469,218,504)(3.00)(221,844,500)(2.12)
Total cash production costs
after by-products credits5,873,0940.1410,053,3400.23(41,959,546)(0.26)155,616,7211.50
Total Copper sold pounds38,917,01043,940,061156,437,873104,545,457
Cash production cost of copper US$ per pound calculated as total cash production cost divided by total copper sold pounds.
MINERAL PROPERTIES
The CSH Mine
The CSH Mine is located in Inner Mongolia Autonomous Region of China (Inner Mongolia). The property hosts two low-
grade, near surface gold deposits, along with other mineralized prospects. The main deposit is called the Northeast Zone
(the “Northeast Zone”), while the second, smaller deposit is called the Southwest Zone (the “Southwest Zone”).
The CSH Mine is owned and operated by Inner Mongolia Pacific Mining Co. Limited, a Chinese Joint Venture in which the
Company holds a 96.5% interest and Ningxia Nuclear Industry Geological Exploration Institution holds the remaining 3.5%.
The CSH Mine is an open-pit mining operations with a designed mining and processing capacity of 60,000 tpd. In July
2019, CSH updated its mine plan based on a result of latest ultimate limit optimization, in which the production rate was
reduced to 40,000 tpd with a life of mine (“LoM”) of seven years as of 2019. The run-of-mine ore is heap leached with
cyanide solution to extract gold and electro-winned to produce a gold dore which is sold to refiners. In June 2020, the
operation of southwest pit ended.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 16 -
The open-pit operations at the CSH gold mine are nearing the end of its mine life. With the increase in the pit’s depth,
the height and exposed area of the pit wall have increased, and the stability of the open pit slopes is becoming more and more prominent in determining the operations plan. Ensuring slope stability and avoiding systematic risks at this stage is the Company’s top priority to ensure safe and sustainable production. The Company continues to evaluate the potential for underground operations. The major new contracts entered into during the year ended December 31, 2025: Item No.Contract NameCounterpart Subject amount
(US$ millions) Contract period
(effective day
and expiration date) Date of Contract
1Sales Contract for Waste MaterialsHunan Zhongxing
Environmental Protection
Technology Co., Ltd
10.812025.3.24 –
2025.4.24
2025.3.24
2Open-pit to Underground
Engineering Design
China ENFI Engineering
Technology Co., Ltd
5.062025.4.24 –
2033.4.24
2025.4.24
3Sales Contract for Waste MaterialsHunan Zhongxing
Environmental Protection
Technology Co., Ltd
11.272025.6.10 –
2025.7.2
2025.6.10
42025 Open-pit Mine Slope
Remediation Project Contract
China National Gold Group
Third Engineering Co., Ltd.
9.372025.8.27 –
2026.10.31
2025.8.27
5Sales Contract for Waste MaterialsHunan Zhongxing
Environmental Protection
Technology Co., Ltd
19.782025.12.25 –
2026.2.24
2025.12.25
Production Update CSH MineThree months ended December 31,Year ended December 31, 2025202420252024
Ore mined and placed on pad (tonnes)1,834,8261,576,24310,299,4049,208,842 Average ore grade (g/t)0.440.410.490.58 Recoverable gold (ounces)17,01413,18795,735102,866 Ending gold in process and gold dore bars (ounces)142,894146,169142,894146,169 Waste rock mined (tonnes)1,493,9222,800,9387,011,84010,548,732
For the three months ended December 31, 2025, the total amount of ore placed on the leach pad was 1.8 million tonnes,
with total contained gold of 17,014 ounces (529 kilograms). The overall accumulative project-to-date gold recovery rate
remained consistent at approximately 56.63% at the end of December 31, 2025 from 56.47% at the end of September
30, 2025. Of which, gold recovery from the phase I and phase II heap leach pads were 59.77% and 54.67% at December
31, 2025, respectively.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 17 -
Exploration
The CSH Gold Mine drilled 264 meters from hole DDH9200-3, which was remaining from the 2024 drilling program. There
was no other drilling program in 2025 for the CSH Mine.
Mineral Resource Update
CSH Mine Mineral Resources by category, at December 31, 2025 under NI 43-101 are listed below:
Location
Mineral
Resource Category Tonnage
(x1000 t)Au (g/t) Metal Au (t)Au (Moz)
Remaining within
the open pit limit
at a cut-off grade of
0.28 g/t Au
Measured6,0310.684.090.132
Indicated6,6470.724.750.153
M+I12,6780.708.840.285
Inferred2,5760.410.150.005
Underground
at a cut-off grade of
0.30 g/t Au
Measured88,2000.6758.661.89
Indicated89,8500.5852.071.67
M+I178,0500.62110.723.56
Inferred62,0900.4930.680.99
Note: Mineral Resources are reported in relation to a conceptual open-pit mining and underground block caving mining. Mineral Resources are not
Mineral Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate.
Raw assays have been capped. Mineral Resources include Mineral Reserves.
Mineral Resources are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching
& metallurgical recovery of 60% and gold bullion market price of USD1,980 per ounce. Additional Mineral Resources are reported at a
cut-off grade of 0.30 g/t Au for underground block caving mining, based on the following parameters: the heap leaching & metallurgical
recovery of 60% and gold bullion market price of USD1,980 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and one troy ounce
is equal to 31.1035 grams.
The mineral resource estimates include Au only. CGME Consulting limited (CGME) has estimated the mineral resources of the CSH gold
deposit based on a cut-off grade of 0.28 g/t Au within the optimized ultimate open-pit limit and a cut-off grade of 0.30 g/t Au below the
open pit limit on April 1, 2022. The resource estimate was conducted using Ordinary Kriging, validated by Inversed Distance Squared
method, and Micromine modelling software.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 18 -
CGME considers that blocks estimated for the first estimation pass with an average anisotropic distance to samples of less than 45 m can be classified
as Measured Mineral Resources, and blocks estimated for the second estimation pass with an average anisotropic distance to samples of less than
80 m can be classified as Indicated Mineral Resources, and blocks estimated for the third estimation pass with an average anisotropic distance to
samples of not more than 150 m can be categorised as Inferred Mineral Resources. For those Measured and Indicated Mineral Resource blocks,
CGME considers that the degree of confidence is sufficient to allow an appropriate application of technical and economic parameters to support
mine planning and to allow evaluation of the economic viability of the deposit, which is also adequate to support the open pit mining operations.
In CGME’s opinion, the upper portions of gold mineralization at the CSH Gold Project are amenable to extraction by open pit mining with a cut-off
grade optimised of 0.28 g/t Au, and the block caving mining operation would be the choice for extraction below the optimized open pit limits with
a cut-off grade of 0.30 g/t Au in this estimation based on a Reasonable Prospect for Eventual Economic Extraction (“RPEEE”). It is noted that the
partial mineral resources outside of the open pit limit but above the bottom plane may not be amenable to extraction in the future. Meanwhile,
the mineral resources located below 840 m ASL at NE zone and 1,250 m ASL at SW zone may not be amendable to extraction in the future due to either excessive depth or high dilution. These mineral resources that may not be amendable to extraction in the future are excluded from the Mineral Resource Statement in this Report. Block model quantity and grade estimates for the CSH gold deposit were classified according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) by Yuan Chen, MSc., MAIG (M4014)/RPGeo (10262) (April 2022), an independent Qualified Person for the
purposes of National Instrument 43-101 and updated by Mr. Yingting Guo, MMSA., PGeo., an independent Qualified Person for the purposes of National Instrument 43-101 on December 31, 2025. Mineral Reserves Update CSH Mine Mineral Reserves by category at December 31, 2025 under NI 43-101 are summarized below: TypeT (x 1,000)Diluted Au g/t Metal Au tAu Moz
Proven6,4050.644.110.13 Probable7,2220.674.870.16
Total13,6270.668.980.29
Note: Mineral Reserves are reported based on the optimized ultimate open pit limit. All figures are rounded to reflect the relative accuracy of the
estimate. Mineral Reserves are included in Mineral Resources.
Mineral Reserves are reported at a cut-off grade of 0.28 g/t Au for open-pit mining, based on the following parameters: the heap leaching
& metallurgical recovery of 60% and gold bullion market price of USD1,568 per ounce. USD1.0000=RMB6.3457 dated in April 2022, and
one troy ounce is equal to 31.1035 grams.
The Proven Mineral Reserves are 6.41 Mt at a grade of 0.64 g/t Au for the gold content of 4.11 t or 0.13 Moz, and the Probable Mineral
Reserves are 7.22 Mt at a grade of 0.67 g/t Au for the gold content of 4.87t or 0.16 Moz, totaling Mineral Reserves of 13.63 Mt at a grade
of 0.66 g/t Au for the gold content of 8.98 t or 0.29 Moz.
The Mineral Reserves for the CSH gold deposit were estimated according to the CIM Definition Standards for Mineral Resources and
Mineral Reserves (May 2014) by Guangpian Zhang, AusIMM, a full time Principal Mining Engineer for CGME and a Qualified Person for
the purposes of National Instrument 43-101.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 19 -
The Jiama Mine
Jiama is a large copper-gold polymetallic deposit containing copper, gold, silver, molybdenum, lead and zinc, located in
the Gandise metallogenic belt in Tibet Autonomous Region of China.
The Jiama Mine has both underground mining and open-pit mining operations. Phase I of the Jiama Mine commenced
operation in the latter half of 2010 and reached its design capacity of 6,000 tpd in early 2011. Phase II of the Jiama Mine commenced mining operations in 2018 with 44,000 tpd design capacity. The combined mining and processing design
capacity at the Jiama Mine is 50,000 tpd. The major new contracts entered into during the year ended December 31, 2025: Item No.Contract NameCounterpart Subject
amount
(US$ millions) Contract period
(effective day and
expiration date) Date of Contract
1Tibet Huatailong Mining Development Co., Ltd. Jiama Copper Polymetallic Mine Youlongbu Tailings Dam PC General Contracting Contract China National Gold Group Construction Co., Ltd.244.252025.03 – 2027.062025.03 2Molybdenum Concentrate Purchase and Sales ContractChina National Gold Group (Shanghai) Trading Co., Ltd. 50.132025.05 – 2028.052025.05 3Supplementary Agreement to the “Tibet Huatailong Mining Development Co., Ltd. 2022-2024 Copper Concentrate Powder Purchase and Sales Contract China National Gold Group International Trading Co., Ltd. 69.632025.05 – 2025.062025.05 4Tibet Huatailong Mining Development Co., Ltd. 2025 Machinery and Equipment Leasing Project Contract Sichuan Haotianyu Construction Machinery Leasing Co., Ltd. 2.912025.04 – 2025.122025.04 5Tibet Huatailong Mining Development Co., Ltd. Jiama Copper Polymetallic Mine Youlongbu Tailings Dam General Contracting and Supervision Project Service Contract Xinjiang Nonferrous Metallurgy Design and Research Institute Co., Ltd. 3.062025.06 – 2027.112025.06 6Tibet Huatailong Mining Development Co., Ltd. Blasting Engineering Construction Service Project Construction Contract Tibet Gaozheng Blasting Engineering Co., Ltd.9.022025.06 – 2026.052025.06 7Tibet Huatailong Mining Development Co., Ltd.23-26 Sub-dam Embankment and Drainage Works of Guolanggou Tailings Pond EPC General Contracting Project BGRIMM Technology Group Co., Ltd. (Consortium Leader), Jiangxi Copper Industry Group Construction Co., Ltd. (Consortium Member) 14.032025.5.6- 2026.6.292025.5.6 8Copper Concentrates Purchase and Sales ContractChina National Gold Group (Shanghai) Trading Co., Ltd. 2,031.282025.5.27-2028.5.272025.5.27 9Contract for Blasting Engineering Construction Services of Tibet Huatailong Mining Development Co., Ltd. Tibet Zhongjin Xinlian Blasting Engineering Co., Ltd.6.162025.6.1-2026.5.312025.05.30 10Sodium HydrosulfideZibo Tengxiang Economic and Trade Co., Ltd.5.122025.6.26-2026.6.252025.6.26 11CementChina Jinyu Gold Materials Co., Ltd.8.032025.6.30-2026.6.292025.6.30 12Sodium HydrosulfideFengshi Chemical (Shanghai) Co., Ltd.7.692025.6.30-2026.6.292025.6.30
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 20 -
Item
No.Contract NameCounterpart
Subject
amount
(US$ millions) Contract period
(effective day and
expiration date) Date of Contract
13Copper-Lead-Zinc Mixed Concentrates Purchase and Sales Contract China National Gold Group (Shanghai) Trading Co., Ltd. 791.212025.7.18-2027.7.172025.7.18 14CementTibet Jiaofa Transportation Industry Co., Ltd.8.012025.11.21- 2026.11.20 2025.11.21 15Steel BallsBaiyin Hengcheng Machinery Manufacturing Co., Ltd.3.042025.11.30- 2026.11.29 2025.11.30 16Steel BallsInner Mongolia Jinyu Fengxing Mining Wear-resistant Materials Co., Ltd. 3.302025.12.29- 2026.12.28 2025.12.29
Production Update Jiama MineThree months ended December 31,Year ended December 31, 2025202420252024
Ore processed (tonnes)2,871,8823,095,47111,838,9168,197,448 Average copper ore grade (%)0.690.780.710.71 Copper recovery rate (%)85828482 Average gold grade (g/t)0.280.320.290.29 Gold recovery rate (%)73747370 Average silver grade (g/t)20.1421.9121.1519.72 Silver recovery rate (%)69687062 Average Lead grade (%)0.771.160.961.24 Lead recovery rate (%)77787875 Average Zinc grade (%)0.530.610.580.68 Zinc recovery rate (%)73727372 Average Moly grade (%)0.0280.030.0370.029 Moly recovery rate (%)3224.973323.20
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 21 -
Exploration
In 2025, Jiama has carried out exploration work in the mine deep and peripheral areas of the Jiama mining area, completing
a total of 1,254 cubic meters of pit exploration, 4,870 meters of underground drilling, and 25,450 meters of surface drilling.
The main results have been achieved as below: 1. further controlling the main skarn orebody of the interlayered structure
in the Jiama mining area, defining the skarn orebodies in the surrounding contact zone; 2. two gold mineralization zones,
one zinc mineralization zone, and one molybdenum mineralization zone have been defined at Bayi Ranch prospecting
area. Since the consolidation of mineral rights in Jiama area, the Jiama Mine has completed a total of 297,720 meters of drilling with 622 holes. Mineral Resources Estimate The Mineral Resource estimate was originally independently completed by Runge Pincock Minarco (RPM) Global dated
12th November 2012. Mining One was provided with the block model and all files related to construction of the model. The information contained within this report is based on information provided to Mining One, which has been verified
and, in some instances, refined by Mining One. The Resource estimate is based on three dimensional geological and
mineralisation models that were informed by the drill hole data set. The Resource is based on three main geological domains that represent Skarn, Hornfels and Porphyry lithologies;
mineralisation is hosted within each of these domains. Domain boundaries were constructed using a combination of the geology domains and a 0.1% Cu equivalent cut–off for the mineralisation. Standard wireframing procedures were used in relation to extrapolation of polygons half the drill spacing distance past known data points and tapering of zone thickness on the periphery of the domains. Mining One Pty Ltd. noted that gold and silver mineralization within the ore body had a significantly higher spatial variability than the other elements. This classification takes into account the proposed large scale mining techniques where Au and Ag will only be credits to the overall products from the operations. Mining One Pty Ltd has assumed that Au and Ag will not be assigned a single cut-off grade for a selected mining block and will be mined in conjunction with the other elements.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 22 - Jiama Mine resources by category as of December 31, 2025 under NI 43-101: Jiama Project – Cu, Mo, Pb, Zn, Au, and Ag Mineral Resources under NI 43-101 Reported at a 0.3% Cu Equivalent Cut off grade*, as of December 31, 2025 Class Quantity MtCu %Mo %Pb %Zn %Au g/tAg g/t Cu Metal (kt) Mo Metal (kt) Pb Metal (kt) Zn Metal (kt)Au MozAg Moz
Measured90.570.380.040.040.020.075.04344.7633.2233.1016.600.2114.67 Indicated1294.560.400.030.050.030.105.485126.91445.26605.10375.054.12227.97 M+I1385.130.400.030.050.030.105.455471.67478.48638.20391.654.33242.64 Inferred405.180.310.030.080.040.105.131256.07121.56324.15174.611.3166.83
Note: Figures reported are rounded which may result in small tabulation errors. The prices of Cu, Mo, Pb, Zn, Au and Ag are US$2.9/lbs; US$15.5/lbs; US$2.9/lbs; US$0.95/lbs; US$1,300/oz and $20/oz respectively. The Copper Equivalent basis for the reporting of resources has been compiled on the following basis: CuEq Grade: = ( Ag Grade * Ag Price + Au Grade * Au Price + Cu Grade * Cu Price + Pb Grade * Pb Price + Zn Grade * Zn Price + Mo Grade * Mo Price)/Copper Price The Mineral Resources include the Mineral Reserves Resource Estimate by Runge Pincock Minarco on 12th November of 2012 and updated by Mining One Pty Ltd. In 2014 and by Tony Guo, P.Geo, a Qualified Person as defined by NI 43-101 in 2025.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 23 - Mineral Reserves Estimate The selected mining strategies developed by CGDI in conjunction with China Gold consider conventional truck shovel mining for the Jiaoyan and South open pits. Various mining methods have been proposed for the Phase II Expansion Underground Mine with the primary method being Sub Level Stoping with fill (Primary/Secondary/(Tertiary)). The reserve estimate for the Jiama Project underground mine is based on a combination of Sub Level Open Stoping with Paste fill, Room and Pillar and Cut and Fill. The mineral reserve estimate is summarised below which are inclusive of the modifying factors for mining recovery and dilution. Jiama Mine reserves by category as of December 31, 2025 under NI 43-101: Jiama Project Statement of NI 43-101 Mineral Reserve Estimate as of December 31, 2025 Class Quantity MtCu %Mo %Pb %Zn %Au g/tAg g/t Cu Metal (kt) Mo Metal (kt) Pb Metal (kt) Zn Metal (kt)Au MozAg Moz
Proven16.600.600.050.020.020.197.6699.618.303.323.320.104.09 Probable320.230.600.030.130.070.1610.381921.3796.07416.30224.161.65106.88 P+P336.830.600.040.120.070.1610.252020.98104.37419.62227.481.75111.97
Notes:
- All Mineral Reserves have been estimated in accordance with the JORC code and have been reconciled to CIM standards as prescribed by the NI 43-101.
- Mineral Reserves were estimated using the following mining and economic factors: Open Pits: a) 5% dilution factor and 95% recovery were applied to the mining method; b) an overall slope angles of 43 degrees; c) a copper price of US$2.9/lbs; d) an overall processing recovery of 88 – 90% for copper. Underground: a) 10% dilution added to all Sub-Level Open Stoping; b) Stope recovery is 87% for Sub-Level Open Stoping; c) An overall processing recovery of 88 – 90% for copper.
- The cut-off grade for Mineral Reserves has been estimated at copper equivalent grades of 0.3% Cu (NSR) for the open pits and 0.45% Cu (NSR) for the underground mine.
- Mineral Reserves have been estimated by Runge Pincock Minarco on 12th November of 2012 and updated by Mining One Pty Ltd. in 2014 and by Tony Guo, MMSA(QP), a Qualified Person as defined by NI 43-101 in 2025.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 24 -
LIQUIDITY AND CAPITAL RESOURCES
The Company operates in a capital intensive industry. The Company’s liquidity requirements arise principally from the need
for financing its mining and mineral processing operations, exploration activities and acquisition of exploration and mining
rights. The Company’s principal sources of funds have been proceeds from borrowings from commercial banks, corporate
bonds financing, equity financings, and cash generated from operations. The Company’s liquidity primarily depends on
its ability to generate cash flow from its operations and to obtain external financing to meet its debt obligations as they
become due, as well as the Company’s future operating and capital expenditure requirements. At December 31, 2025, the Company had an accumulated surplus of US$813.1 million, working capital of US$580.0
million and borrowings of US$533.4 million. The Company’s cash balance at December 31, 2025 was US$739.4 million, among which cash and cash equivalents was US$399.4 million, Restricted cash was US$34.2 million, term deposits was US$305.9 million. Management believes that its forecast operating cash flows are sufficient to cover the next twelve months of the Company’s operations including its planned capital expenditures and current debt repayments. The Company’s borrowings are comprised of US$217.0 million of short term debt facilities with interest rates ranging from 1.25% to 4.36% per annum arranged
through various banks. In addition, on November 3, 2015, the Company entered into a Loan Facility agreement with a
syndicate of banks, led by Bank of China. The lenders agreed to lend an aggregate principal amount of RMB3.98 billion, approximately US$613 million with the initial interest rate of 2.83% per annum. The proceeds from the Loan Facility are to be used for the development of the Jiama Mine. The loan is secured by the mining rights for the Jiama Mine. As of
December 31, 2025 the Company has fully drawn under this Facility. The outstanding loan balance is RMB1.39 billion
(approximately US$197 million), bearing an annual interest rate of 1.5% maturing on November 5, 2028. On April 29, 2020, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB1.4 billion (approximately US$197.8 million).As of
December 31, 2025, the Company has fully drawn down under this facility. The outstanding loan balance is RMB824
million (approximately US$117 million), bearing an annual interest rate of 1.95%, with maturity on April 28, 2033. On August 8, 2025, the Company entered into another loan facility agreement with a bank syndicate. The lenders agreed to make available a loan with an aggregate principal amount of RMB2.1 billion (approximately US$294 million).As of
December 31, 2025, the Company has drawn down RMB50 million (approximately US$7.11 million) under this facility,
bearing an annual interest rate of 1.5%, with maturity on June 21, 2030. On May 31, 2023, the Company obtained a bilateral loan with an aggregate principal amount of RMB400 million
(approximately US$56.5 million) from China Gold Finance Co., Ltd. at an annual interest rate of 2.05%. As of December 31, 2025, the outstanding loan balance was RMB400 million (approximately US$56.91 million).
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 25 -
On November 9, 2023, the Company obtained a bilateral loan with an aggregate principal amount of RMB100 million
(approximately US$14.1 million) from China Construction Bank at an annual interest rate of 1.85%. As of December 31, 2025, the outstanding loan balance was RMB90 million (approximately US$12.8 million). On May 13, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million
(approximately US$28.2 million) from Lhasa Chengguan District Sub branch of Agricultural Bank of China Co., Ltd. at an annual interest rate of 1.85% for a term of 3 years. As of December 31, 2025, the outstanding loan balance was RMB65 million (approximately US$9.2 million). On August 20, 2024, the Company obtained a bilateral loan with an aggregate principal amount of RMB200 million
(approximately US$28.04 million) from China Gold Finance Co., Ltd. at an annual interest rate of 2.45% for a term of 3 years. As of December 31, 2025, the outstanding loan balance was RMB180 million (approximately US$25.61 million). On May 12, 2025, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$64 million from China Construction Bank (Asia) Corporation Limited, bearing interest at a floating rate based on Term SOFR. On June 10, 2025, the Company obtained a 1 year revolving bilateral loan with an aggregate principal amount of US$15 million from China Everbright Bank Co., Ltd., Hong Kong Branch, bearing interest at a floating rate based on Term SOFR. The Company believes that the availability of debt financing in China at favorable rates will continue for the foreseeable
future. The Company continues to review and assess its assets for impairment as part of its financial reporting processes. To date, the assessment carried out by the Company support the carrying values of the Company’s assets and no impairment has been required. However, the management of the Company continues to evaluate key assumptions on estimates and management judgements in order to determine the recoverable amount of the CSH Mine and the Jiama Mine.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 26 - CASH FLOWS The following table sets out selected cash flow data from the Company’s consolidated cash flow statements for the year ended December 31, 2025 and December 31, 2024. Year ended December 31, 20252024 US$’000US$’000
Net cash from operating activities709,984306,896 Net cash used in investing activities(246,828)(204,875) Net cash used in financing activities(253,685)(16,171) Net increase (decrease) in cash and cash equivalents209,47185,850 Effect of foreign exchange rate changes on cash and cash equivalents6,152692 Cash and cash equivalents, beginning of period183,77997,237
Cash and cash equivalents, end of period399,402183,779
Operating cash flow
For the year ended December 31, 2025, net cash inflow from operating activities was US$710.0 million which is primarily
attributable (i) profit before income tax of US$560.2 million (ii) depreciation of property, plant and equipment of US$132.0
million and (iii) decrease in restricted bank balances of US$32.5 million, partially offset by (i) income tax paid of US$47.6
million (ii) interest paid of US$15.8 million and (iii) Interest income of US$8.7 million.
Investing cash flow
For the year ended December 31, 2025, the net cash outflow from investing activities was US$246.8 million which is
primarily attributable to (i) placement of term deposits of US$306.6 million (ii) payment for acquisition of property, plant
and equipment of US$50.1 million and (iii) payment for land use right of US$19.8 million, offset by (i) release of term
deposits of US$119.0 million and (ii) interest income received of US$8.7 million.
Financing cash flow
For the year ended December 31, 2025, the net cash outflow mainly from financing activities was US$253.7 million
which is primarily attributable to (i) repayment of borrowings of US$306.2 million (ii) dividends paid to shareholders of the
Company of US$31.7 million and (iii) dividends paid to non-controlling shareholders of US$1.2 million offset by proceeds
of bank and other borrowings of US$86.0 million.
Expenditures Incurred
For the year ended December 31, 2025, the Company incurred mining costs of US$61.1 million, mineral processing costs
of US$104.7 million and transportation costs of US$3.4 million.
Gearing ratio
Gearing ratio is defined as the ratio of consolidated total debt to consolidated total equity. As at December 31, 2025, the
Company’s total debt was US$533.4 million and the total equity was US$2,337.0 million. The Company’s gearing ratio
was therefore 0.23 as at December 31, 2025 compared to 0.26 as at September 30, 2025.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 27 -
SIGNIFICANT INVESTMENTS, ACQUISITIONS AND DISPOSAL OF SUBSIDIARIES. ASSOCIATES
AND JOINT VENTURES, AND FUTURE PLAN FOR MATERIAL INVESTMENTS OF CAPITAL
ASSETS Other than as disclosed elsewhere in this MD&A or in the consolidated financial statements for the year ended December 31, 2025, there were no significant investments held by the Company, nor were there any material acquisitions or disposals of subsidiaries, associates and joint ventures during the year ended December 31, 2025. Other than as disclosed in this MD&A, there was no plan authorized by the Board for other material investments or additions of capital assets at the date of this MD&A. CHARGE ON ASSETS Other than as disclosed elsewhere in this MD&A and condensed consolidated financial statements, none of the Company’s assets were pledged as at December 31, 2025. EXPOSURE TO FLUCTUATIONS IN EXCHANGE RATES AND RELATED HEDGES The Company is exposed to the financial risk related to the fluctuation of foreign exchange rates for the monetary assets and liabilities denominated in the currencies other than the functional currencies to which they relate. The Company has not hedged its exposure to currency fluctuation. However, the Management monitors foreign exchange exposure and will consider hedging significant foreign currency exposure should the need arise. Refer to Note 33, Financial Instruments, in the annual consolidated financial statements for the year ended December 31, 2025. COMMITMENTS Commitments include principal payments on the Company’s bank loans and syndicated loan facility, corporate bonds,
and capital commitments in respect of the future acquisition of property, plant and equipment and construction for both the CSH Mine and the Jiama Mine. The Company’s capital commitments relate primarily to the payments for purchase of equipment and machinery for both mines and payments to third-party contractors for the provision of mining and exploration engineering work and mine
construction work for both mines. The Company has entered into contracts that prescribe such capital commitments;
however, liabilities relating to them have not yet been incurred. Refer to Note 34, Commitments, in the annual consolidated financial statements for the year ended December 31, 2025. The following table outlines payments for commitments for the periods indicated: Total Within
One year Within Two
to five years Over
five years US$’000US$’000US$’000US$’000
Principal repayment of bank loans504,985217,004219,17168,810 Entrusted loan payable28,45428,454––
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 28 -
In addition to the table set forth above, the Company has entered into service agreements with third-party contractors for
the provision of mining and exploration engineering work and mine construction work for the CSH Mine. The fees for such
work performed and to be performed each year varies depending on the amount of work performed. The Company has
similar agreements with third party contractors for the Jiama Mine. RELATED PARTY TRANSACTIONS China National Gold Group Co., Ltd. (formerly known as China National Gold Group Corporation) (“CNG”) owned 40.01
percent of the outstanding common shares of the Company as at December 31, 2024 and December 31, 2025. The Company had major related party transactions with the following companies related by way of shareholders or
shareholder in common: The Company’s subsidiary, Inner Mongolia Pacific is a party to a non-exclusive contract for the purchase and sale of doré with CNG (the “Dore Sales Contract”) pursuant to which Inner Mongolia Pacific sells gold doré bars to CNG. The pricing is based on the monthly average price of gold ingot as quoted on the Shanghai Gold Exchange and the daily average price of silver as quoted on the Shanghai Huatong Platinum & Silver Exchange prevailing at the time of each relevant purchase order during the contract period. The Dore Sales Contract has been in effect since October 24, 2008 and was renewed for a new term that commenced on January 1, 2018 and expired on December 31, 2020, which renewal was approved by the Company’s shareholders on June 28, 2017. On June 16, 2020, the third Supplemental Contract for Purchase and Sale of Dore was approved by the Company’s Shareholders, commencing on January 1, 2021 and expiring on December 31,
- On June 29, 2023, the fourth supplemental Contract for Purchase and Sale of Dore was approved by the Company’s
Shareholders, commencing on January 1, 2024 and expiring on December 31, 2026.
Revenue from sales of gold doré bars to CNG was US$338.5 million for the year ended December 31, 2025 which increased
from US$246.9 million for the year ended December 31, 2024.
The Company is also a party to a Product and Service Framework Agreement with CNG, pursuant to which CNG provides
construction, procurement and equipment financing services to the Company and also purchases the copper concentrates
produced at the Jiama Mine. The quantity of copper concentrates, pricing terms and payment terms may be established
from time to time by the parties with reference to the pricing principles for connected transactions set out under the Product
and Service Framework Agreement. On June 28, 2017, the Supplemental Product and Service Framework Agreement was
approved and extended to expire on December 31, 2020. On June 16, 2020, the third Supplemental Product and Service
Framework Agreement was approved by the Company’s Shareholders, commencing on January 1, 2021 and expiring on
December 31, 2023. On June 29, 2023, the fourth Supplemental Product and Service Framework Agreement was approved
by the Company’s Shareholders, commencing on January 1, 2024 and expiring on December 31, 2026. For the year
ended December 31, 2025, revenue from sales of copper concentrate and other products to CNG was US$964.8 million compared to US$505.1 million for the same period in 2024. For the year ended December 31, 2025, construction services of US$139.1 million were provided to the Company by
subsidiaries of CNG compared to US$91.3 million for the same period in 2024.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 29 -
In addition to the aforementioned major related party transactions, the Company also obtains additional services from
related parties in its normal course of business, including a Loan Agreement and a Deposit Services Agreement entered into on March 25, 2019, December 31, 2019, December 22, 2020 and a Financial Service Agreement on May 5, 2021 among the Company and China Gold Finance. The Company and China Gold Finance entered into a 2024 Financial
Service Agreement on June 6, 2024. As part of the 2024 Financial Service Agreement, China Gold Finance agreed to
provide the Company with a range of financial services including (a) Deposit Services, (b) Lending Services, (c) Settlement Services and (d) Other Financial Services. On June 27, 2024, the 2024 Financial Services Agreement was approved by
the Company’s Shareholders, commencing on the date of the approval by the Independent Shareholders and up to and including December 31, 2026. Refer to Note 30 of the consolidated financial statements for details of significant related party transactions during the
year ended December 31, 2025. PROPOSED TRANSACTIONS The Board of Directors has given the Company approval to conduct reviews of a number of projects that may qualify as acquisition targets through joint venture, merger and/or outright acquisitions. The Company did not have any material
acquisition and disposal of subsidiaries and associated companies for the year ended December 31, 2025. The Company continues to review possible acquisition targets. CRITICAL ACCOUNTING ESTIMATES In the process of applying the Company’s accounting policies, the Directors of the Company have identified accounting
judgments and key sources of estimation uncertainty that have a significant effect on the amounts recognized in the audited annual consolidated financial statements. Key assumptions concerning the future and other key sources of estimation uncertainty at the end of each reporting period that have a risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next twelve
months are described in Note 4 of the audited annual consolidated financial statements for the year ended December
31, 2025. CHANGE IN ACCOUNTING POLICIES A summary of new and revised IFRS standards and interpretations are outlined in Note 2 of the audited annual consolidated financial statements as at December 31, 2025. FINANCIAL INSTRUMENTS AND OTHER INSTRUMENTS The Company holds a number of financial instruments, the most significant of which are equity securities, accounts
receivables, accounts payables, cash and loans. The financial instruments are recorded at either fair values or amortized amount on the balance sheet. The Company did not have any financial derivatives or outstanding hedging contracts as
at December 31, 2025.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 30 -
OFF-BALANCE SHEET ARRANGEMENTS
As at December 31, 2025, the Company had not entered into any off-balance sheet arrangements.
DIVIDEND AND DIVIDEND POLICY
The Company’s dividend policy is a key component of its long-term growth strategy. It aims to optimize capital allocation to
drive business expansion while maintaining stable returns for shareholders. After successfully distributing special dividends
for three consecutive years (2021-2023), the Company is introducing an enhanced dividend policy comprised of a base
dividend supplemented by a variable component that adjusts based on financial performance and market conditions.
Basic dividend: Subject to profitability in the previous financial year and after assessing the Company’s cash flow position
and future capital requirements, the Company aims to distribute a basic dividend at a payout ratio of 30% of the net profit
from the preceding financial year, with cash dividends paid annually.
Variable Component: Subject to favorable market conditions and sufficient funds, the Company may distribute special
dividends in addition to the basic dividend. Dividends may vary in amount and consistency or be discontinued at the Board of Directors’ discretion depending on
variables including but not limited to operational cash flows, Company development requirements and strategies, spot
metal prices, taxation, general market conditions and other factors. Subsequent to the end of the reporting period, a dividend in respect of the year ended December 31, 2025 of US$0.47 per common share, (the basic dividend of US$140,088,841, and the special dividend of US$46,696,280) in an aggregate amount of US$186,785,121, has been declared by the directors of the Company upon the approval of the board resolution dated March 30, 2026. OUTSTANDING SHARES As of December 31, 2025 the Company had 396,413,753 common shares issued and outstanding. DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING Management is responsible for the design of disclosure controls and procedures (“DC&P”) and the design of internal
control over financial reporting (“ICFR”) to provide reasonable assurance that material information relating to the Company, including its consolidated subsidiaries, is made known to the Company’s certifying officers. The Company’s Chief Executive Officer and Chief Financial Officer have each evaluated the Company’s DC&P and ICFR as of December 31, 2025 and, in accordance with the requirements established under Canadian National Instrument 52-109 – Certification of Disclosure
in Issuer’s Annual and Interim Filings, the Chief Executive Officer and Chief Financial Officer have concluded that these controls and procedures were effective as of December 31, 2025, and provide reasonable assurance that material information relating to the Company is made known to them by others within the Company and that the information required to be
disclosed in reports that are filed or submitted under Canadian securities legislation are recorded, processed, summarized and reported within the time period specified in those rules.
MANAGEMENT’S DISCUSSION AND ANALYSIS
- 31 -
The Company’s Chief Executive Officer and Chief Financial Officer have used the Committee of Sponsoring Organizations
of the Treadway Commission (COSO) 2013 framework to evaluate the Company’s ICFR as of December 31, 2025 and have
concluded that these controls and procedures were effective as of December 31, 2025 and provide reasonable assurance
that financial information is recorded, processed, summarized and reported in a timely manner. Management is required
to apply its judgment in evaluating the cost-benefit relationship of possible controls and procedures. The result of the
inherent limitations in all control systems means design of controls cannot provide absolute assurance that all control
issues and instances of fraud will be detected. During the year ended December 31, 2025, there were no changes in the Company’s DC&P or ICFR that materially affected, or are reasonably likely to materially affect, the Company’s internal
control over financial reporting. RISK FACTORS There are certain risks involved in the Company’s operations, some of which are beyond the Company’s control. Aside
from risks relating to business and industry, the Company’s principal operations are located within the People’s Republic of China and are governed by a legal and regulatory environment that in some respects differs from that which prevails in other countries. Readers of this MD&A should give careful consideration to the information included in this document and the Company’s audited annual consolidated financial statements and related notes. Significant risk factors for the Company are metal prices, government regulations, foreign operations, environmental compliance, the ability to obtain additional
financing, risk relating to recent acquisitions, dependence on management, title to the Company’s mineral properties,
natural disasters, pandemics such as COVID-19 and litigation. China Gold International’s business, financial condition or results of operations could be materially and adversely affected by any of these risks. For details of risk factors, please
refer to the Company’s annual audited consolidated financial statements, and Annual Information Form filed from time to time on SEDAR+ at www.sedarplus.ca and www.hkex.com.hk. QUALIFIED PERSON Disclosure of scientific or technical information in this MD&A was reviewed and approved by Mr. Tony Guo, MMSA(QP), the Company’s Qualified Person (“QP”) as defined by National Instrument 43-101. March 30, 2026
INDEPENDENT AUDITOR’S REPORT
- 32 -
TO THE SHAREHOLDERS OF
CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD.
(incorporated in British Columbia, Canada with limited liability)
OPINION
We have audited the consolidated financial statements of China Gold International Resources Corp. Ltd. (the “Company”)
and its subsidiaries (collectively referred to as the “Group”) set out on pages 37 to 118, which comprise the consolidated
statement of financial position as at December 31, 2025, and the consolidated statement of profit or loss and other
comprehensive income, consolidated statement of changes in equity and consolidated statement of cash flows for the
year then ended, and notes to the consolidated financial statements, including material accounting policy information. In our opinion, the consolidated financial statements give a true and fair view of the consolidated financial position of the Group as at December 31, 2025, and of its consolidated financial performance and its consolidated cash flows for the year then ended in accordance with IFRS Accounting Standards as issued by the International Accounting Standards Board
(“IASB”) and have been properly prepared in compliance with the disclosure requirements of the Hong Kong Companies Ordinance. BASIS FOR OPINION We conducted our audit in accordance with International Standards on Auditing (“ISAs”). Our responsibilities under those standards are further described in the Auditor’s Responsibilities for the Audit of the Consolidated Financial Statements
section of our report. We are independent of the Group in accordance with the “Code of Ethics for Professional Accountants”
issued by the Hong Kong Institute of Certified Public Accountants (“Code”), as applicable to audits of financial statements of public interest entities. We also have fulfilled our other ethical responsibilities in accordance with the Code. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion. KEY AUDIT MATTER Key audit matter is the matter that, in our professional judgment, was of most significance in our audit of the consolidated financial statements of the current period. This matter was addressed in the context of our audit of the consolidated financial statements as a whole, and in forming our opinion thereon, and we do not provide a separate opinion on this matter.
TO THE SHAREHOLDERS OF
CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
KEY AUDIT MATTER (Cont’d)
Key audit matterHow our audit addressed the key audit matter
Gold in Progress
Refer to summary of accounting policies on “inventories” in note 3,
accounting estimates and judgements in note 4(b) and disclosure
of inventory in note 17 to the consolidated financial statements.
For the year ended December 31, 2025, the carrying amount of
inventory was approximately US$295 million. Inventory of the Group
mainly includes gold in process inventory of approximately US$249
million, representing approximately 7.4% of the Group’s total assets.
The Group measured its inventory at the lower of cost and estimated
net realisable value. Gold in process inventory represents ore placed
on leach pads and in process through heap leaching operations.
Due to the nature of heap leaching, the quantity of recoverable gold
cannot be directly measured and is instead estimated using models
based on ore tonnage, assay grades and expected recovery rates.
Assumptions and estimations are required in determining the
quantity of gold in process inventories including the gold contained
in the ore placed on leach pads and correspondingly gold that
is expected to be recovered. The Group could be required to
write down the recorded value of its gold in process inventories if
estimations and assumptions are inaccurate. Because the nature
of leaching process inherently limits the ability to precisely monitor
inventory levels. The actual recovery of gold from the leach pad
is not known until the leaching process has concluded at the end
of the mine life.
We have identified existence and valuation on gold in process
inventory as a key audit matter because of its significance to
the Group’s consolidated financial statements and involvement
of significant management estimates in determining estimated
outcomes of the models in assessing the existence and valuation
of inventory as mentioned in the forgoing paragraphs.
Our procedures in relation to the existence of gold in
process inventory included:
• Obtained an understanding of the Group’s
process and controls over estimation of gold in
process.
• Tested the underlying production data used
in estimation of gold in process used by
management.
• Obtained ore samples during a site visit and
submitted these samples to an independent
external laboratory testing to assess the reliability
and consistency of assay grades used by
management.
• Engaged auditors’ expert to assist our assessment
on the appropriateness of recovery rates
adopted by management from heap leaching
gold processing and the reasonableness on the
model applied by management in estimating
gold in process from heap leaching.
• Tested the mathematical accuracy of the gold-
in-process estimation model and independently
recalculated the estimated recoverable gold
based on management’s key assumptions.
• Performed sensitivity analysis on assessing the
possible impact of reasonably changes in critical
assumption such as recovery rates.
INDEPENDENT AUDITOR’S REPORT
- 33 -
TO THE SHAREHOLDERS OF
CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
OTHER MATTERS
The consolidated financial statements of the Group for the year ended December 31, 2024 were audited by another auditor
who expressed an unmodified opinion on those statements on March 27, 2025.
OTHER INFORMATION
The directors are responsible for the other information. The other information comprises the information included in the
annual report, but does not include the consolidated financial statements and our auditor’s report thereon.
Our opinion on the consolidated financial statements does not cover the other information and we do not express any
form of assurance conclusion thereon.
In connection with our audit of the consolidated financial statements, our responsibility is to read the other information and,
in doing so, consider whether the other information is materially inconsistent with the consolidated financial statements
or our knowledge obtained in the audit or otherwise appears to be materially misstated. If, based on the work we have
performed, we conclude that there is a material misstatement of this other information, we are required to report that fact.
We have nothing to report in this regard.
RESPONSIBILITIES OF DIRECTORS FOR THE CONSOLIDATED FINANCIAL STATEMENTS
The directors are responsible for the preparation of the consolidated financial statements that give a true and fair view in
accordance with IFRS Accounting Standards as issued by the IASB and the disclosure requirements of the Hong Kong
Companies Ordinance, and for such internal control as the directors determine is necessary to enable the preparation of
consolidated financial statements that are free from material misstatement, whether due to fraud or error.
In preparing the consolidated financial statements, the directors are responsible for assessing the Group’s ability to
continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern
basis of accounting unless the directors either intend to liquidate the Group or to cease operations, or have no realistic
alternative but to do so.
The directors are responsible for overseeing the Group’s financial reporting process. The audit committee of Company (the
“Audit Committee”) assists the directors in discharging their responsibility in this regard.
AUDITOR’S RESPONSIBILITIES FOR THE AUDIT OF THE CONSOLIDATED FINANCIAL STATEMENTS
Our objectives are to obtain reasonable assurance about whether the consolidated financial statements as a whole are
free from material misstatement, whether due to fraud or error, and to issue an auditor’s report that includes our opinion
solely to you, as a body, in accordance with our agreed terms of engagement, and for no other purpose. We do not assume
responsibility towards or accept liability to any other person for the contents of this report.
INDEPENDENT AUDITOR’S REPORT
- 34 -
TO THE SHAREHOLDERS OF
CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
AUDITOR’S RESPONSIBILITIES FOR THE AUDIT OF THE CONSOLIDATED FINANCIAL STATEMENTS
(Cont’d)
Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with ISAs
will always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are considered
material if, individually or in the aggregate, they could reasonably be expected to influence the economic decisions of
users taken on the basis of these consolidated financial statements.
As part of an audit in accordance with ISAs, we exercise professional judgment and maintain professional skepticism
throughout the audit. We also:
• Identify and assess the risks of material misstatement of the consolidated financial statements, whether due to fraud
or error, design and perform audit procedures responsive to those risks, and obtain audit evidence that is sufficient
and appropriate to provide a basis for our opinion. The risk of not detecting a material misstatement resulting from
fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions,
misrepresentations, or the override of internal control.
• Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate
in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Group’s internal
control.
• Evaluate the appropriateness of accounting policies used and the reasonableness of accounting estimates and related
disclosures made by the directors.
• Conclude on the appropriateness of the directors’ use of the going concern basis of accounting and, based on the
audit evidence obtained, whether a material uncertainty exists related to events or conditions that may cast significant
doubt on the Group’s ability to continue as a going concern. If we conclude that a material uncertainty exists, we are
required to draw attention in our auditor’s report to the related disclosures in the consolidated financial statements
or, if such disclosures are inadequate, to modify our opinion. Our conclusions are based on the audit evidence
obtained up to the date of our auditor’s report. However, future events or conditions may cause the Group to cease
to continue as a going concern.
• Evaluate the overall presentation, structure and content of the consolidated financial statements, including the
disclosures, and whether the consolidated financial statements represent the underlying transactions and events in
a manner that achieves fair presentation.
• Plan and perform the group audit to obtain sufficient appropriate audit evidence regarding the financial information
of the entities or business units within the Group as a basis for forming an opinion on the group financial statements.
We are responsible for the direction, supervision and review of the audit work performed for purposes of the group
audit. We remain solely responsible for our audit opinion.
INDEPENDENT AUDITOR’S REPORT
- 35 -
TO THE SHAREHOLDERS OF
CHINA GOLD INTERNATIONAL RESOURCES CORP. LTD. (continued)
(incorporated in British Columbia, Canada with limited liability)
AUDITOR’S RESPONSIBILITIES FOR THE AUDIT OF THE CONSOLIDATED FINANCIAL STATEMENTS
(Cont’d)
We communicate with the Audit Committee regarding, among other matters, the planned scope and timing of the audit
and significant audit findings, including any significant deficiencies in internal control that we identify during our audit.
We also provide the Audit Committee with a statement that we have complied with relevant ethical requirements regarding
independence, and to communicate with them all relationships and other matters that may reasonably be thought to bear
on our independence, and where applicable, actions taken to eliminate threats or safeguards applied.
From the matter communicated with the directors, we determine the matter that was of most significance in the audit of
the consolidated financial statements of the current period and is therefore the key audit matter. We describe this matter
in our auditor’s report unless law or regulation precludes public disclosure about the matter or when, in extremely rare
circumstances, we determine that a matter should not be communicated in our report because the adverse consequences
of doing so would reasonably be expected to outweigh the public interest benefits of such communication.
BDO Limited
Certified Public Accountants
PAK, Tak Lun, Amos
Practising Certificate no. P06170
Hong Kong,
March 30, 2026
INDEPENDENT AUDITOR’S REPORT
- 36 -
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME FOR THE YEAR ENDED DECEMBER 31, 2025
- 37 - NOTES20252024 US$’000US$’000 Revenue51,310,125756,646 Cost of sales(626,134)(569,726)
Mine operating earnings683,991186,920
Expenses General and administrative expenses6(59,934)(47,566) Exploration and evaluation expenditure(1,133)(438) Research and development expenses(32,799)(15,722)
(93,866)(63,726)
Income from operations590,125123,194
Other (expenses) income Foreign exchange loss, net(349)(2,561) Interest and other income11,7315,109 Other expenses7(22,538)(10,132) Finance costs8(18,804)(22,390)
(29,960)(29,974)
Profit before income tax560,16593,220 Income tax expense9(87,850)(27,922)
Profit for the year10472,31565,298
Other comprehensive income (expense) for the year Item that will not be reclassified to profit or loss: Fair value gain on equity instruments at fair value through other comprehensive income (“FVTOCI”)1985,4641,271 Item that may be reclassified subsequently to profit or loss: Exchange difference arising on translation of foreign operations25,993(8,422)
111,457(7,151)
Total comprehensive income for the year583,77258,147
NOTE20252024 US$’000US$’000 Profit for the year attributable to: Non-controlling interests5,3562,566 Owners of the Company466,95962,732
472,31565,298
Total comprehensive income for the year
attributable to:
Non-controlling interests5,3562,567
Owners of the Company578,41655,580
583,77258,147
Earnings per share – Basic and Dilutive (US cents)13117.8015.82
Weighted average number of common shares – Basic and Dilutive13396,413,753396,413,753
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME FOR THE YEAR ENDED DECEMBER 31, 2025
- 38 -
CONSOLIDATED STATEMENT OF FINANCIAL POSITION AT DECEMBER 31, 2025
- 39 - NOTES20252024 US$’000US$’000 Current assets Cash and cash equivalents14399,402183,779 Restricted bank balances1434,16266,698 Term deposits14305,884118,246 Trade and other receivables158,2467,393 Prepaid expenses and deposits161,7941,513 Inventories17294,536290,405
1,044,024668,034
Non-current assets Prepaid expenses and deposits167430,095 Right-of-use assets18104,51945,957 Equity instruments at FVTOCI19133,87548,411 Property, plant and equipment201,339,4471,375,498 Intangible assets21724,647752,414 Other non-current assets229,94915,570
2,312,5112,267,945
Total assets3,356,5352,935,979
Current liabilities Accounts and other payables and accrued expenses23181,828175,132 Contract liabilities2410,0638,099 Borrowings25217,004148,696 Entrusted loan payable2628,454– Lease liabilities271,417469 Tax liabilities25,2538,650
464,019341,046
NOTE20252024 US$’000US$’000 Net current assets580,005326,988
Total assets less current liabilities2,892,5162,594,933
Non-current liabilities Accounts and other payables and accrued expenses2325,41932,822 Borrowings25287,981565,656 Entrusted loan payable26–27,823 Lease liabilities2712,628459 Deferred tax liabilities9135,665112,000 Deferred income1919 Environmental rehabilitation2893,77869,948
555,490808,727
Total liabilities1,019,5091,149,773
Owners’ equity Share capital291,229,0611,229,061 Reserves266,98599,737 Retained profits813,095433,640
2,309,1411,762,438 Non-controlling interests27,88523,768
Total owners’ equity2,337,0261,786,206
Total liabilities and owners’ equity3,356,5352,935,979
The consolidated financial statements on pages 37 to 118 were approved and authorised for issue by the Board of Directors on March 30, 2026 and are signed on its behalf by:
Chenguang HouYingbin Ian He DirectorDirector CONSOLIDATED STATEMENT OF FINANCIAL POSITION AT DECEMBER 31, 2025
- 40 -
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY FOR THE YEAR ENDED DECEMBER 31, 2025
- 41 - Attributable to the owners of the Company
InvestmentsNon–Total NumberShareEquityrevaluationExchangeStatutoryRetainedcontrollingowners’ of sharescapitalreservereservereservereservesprofitsSubtotalinterestsequity US$’000US$’000US$’000US$’000US$’000US$’000US$’000US$’000US$’000 (Note) At January 1, 2024396,413,7531,229,06111,17926,318(61,875)121,800380,3751,706,85820,8831,727,741
Profit for the year––––––62,73262,7322,56665,298 Fair value gain on equity instruments at FVTOCI–––1,271–––1,271–1,271 Exchange difference arising on translation––––(8,423)––(8,423)1(8,422)
Total comprehensive income (expenses) for the year–––1,271(8,423)–62,73255,5802,56758,147 Transfer to statutory reserves – appropriation from retained profits–––––9,436(9,436)––– Transfer to reserve fund – appropriation from retained profits–––––31(31)––– Dividends paid to a non-controlling shareholder––––––––(1,250)(1,250) Other––––––––1,5681,568
At December 31, 2024396,413,7531,229,06111,17927,589(70,298)131,267433,6401,762,43823,7681,786,206
Profit for the year––––––466,959466,9595,356472,315 Fair value gain on equity instruments at FVTOCI–––85,464–––85,464–85,464 Exchange difference arising on translation––––25,993––25,993–25,993
Total comprehensive income for the year–––85,46425,993–466,959578,4165,356583,772 Transfer to statutory reserves – appropriation from retained profits–––––55,791 (55,791)––– Dividends paid to shareholders––––––(31,713)(31,713)–(31,713) Dividends paid to a non-controlling shareholder––––––––(1,239)(1,239)
At December 31, 2025396,413,7531,229,06111,179113,053(44,305)187,058 813,0952,309,14127,8852,337,026
Note: Statutory reserves which consist of (1) appropriations from the profit after taxation of the subsidiaries established in the People’s Republic
of China (“PRC”) and (2) provision of safety production fund of the subsidiaries engaged in the exploration and development in the mining
industry, form part of the equity of PRC subsidiaries. In accordance with the PRC Company Law and the Articles of Association of the PRC
subsidiaries, the PRC subsidiaries are required to appropriate an amount equal to a minimum of 10% of their profits after taxation each
year to a statutory reserve or reserve fund until the reserve reaches 50% of the registered capital of the respective subsidiaries. Pursuant
to the Caizi (2022) No.136 on implementation of entities’ safety production funds management, effective on November 21, 2022, and in
accordance with the Articles of Association of the PRC subsidiaries, the PRC subsidiaries are required to appropriate an amount, equal to
RMB5 per ton multiplied by the volume of ore mined less actual payment, each year to a statutory reserve and utilise an amount when the
actual payment is more than RMB5 per ton multiplied by the volume of ore mined.
CONSOLIDATED STATEMENT OF CASH FLOWS FOR THE YEAR ENDED DECEMBER 31, 2025
- 42 - 20252024 US$’000US$’000 Operating activities Profit before income tax560,16593,220 Items not requiring use of cash and cash equivalents: Amortisation of mining rights29,08319,906 Depreciation of property, plant and equipment131,998121,285 Depreciation of right-of-use assets4,9184,776 Interest income(8,705)(3,114) Dividend income(3,026)(2,095) Finance costs18,80422,390 Provision for impairment of: – trade and other receivables1,4342,051 – other non-current assets5,879– Write-down of inventories–291 Loss on disposal of property, plant and equipment2,369620 Unrealised foreign exchange loss, net3,9561,403
746,875260,733 Change in operating working capital items: Trade and other receivables(2,477)6,470 Inventories(4,131)226 Contract liabilities1,9647,954 Restricted bank balances32,536– Accounts and other payables and accrued expenses(707)68,414
Cash generated from operations774,060343,797 Environmental rehabilitation expense paid(692)(7,841) Interest paid(15,802)(19,538) PRC income tax paid(47,582)(9,522)
Net cash from operating activities709,984306,896
CONSOLIDATED STATEMENT OF CASH FLOWS FOR THE YEAR ENDED DECEMBER 31, 2025
- 43 - 20252024 US$’000US$’000 Investing activities Interest received8,7053,114 Dividends received from equity investment at FVTOCI3,0262,095 Payment for acquisition of mining rights–(1,226) Payment for acquisition of property, plant and equipment(50,136)(48,286) Proceeds from disposal of property, plant and equipment12– Deposits paid for water treatment project–(6,096) Payment for land use right(19,773)(11,217) Payment for deposit for acquisition of land use right–(23,906) Payment for acquisition of intangible assets(150)– Payment for right-of-use assets on or before commencement date(874)– Placement of term deposits(306,638)(133,395) Release of term deposits119,00014,042
Net cash used in investing activities(246,828)(204,875)
Financing activities Repayments of borrowings(306,219)(156,955) Proceeds from borrowings86,000142,633 Dividends paid to a non-controlling shareholder(1,239)(1,250) Dividends paid to shareholders(31,713)– Repayments of lease liabilities(514)(599)
Net cash used in financing activities(253,685)(16,171)
Net increase in cash and cash equivalents209,47185,850 Cash and cash equivalents, beginning of year183,77997,237 Effect of foreign exchange rate changes on cash and cash equivalents6,152692
Cash and cash equivalents, end of year399,402183,779
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 44 -
-
GENERAL INFORMATION 1.1 General information China Gold International Resources Corp. Ltd. (the “Company”) is a publicly listed company incorporated in
British Columbia, Canada on May 31, 2000 with limited liability under the legislation of the Province of British Columbia and its shares are listed on the Toronto Stock Exchange and The Stock Exchange of Hong Kong
Limited (the “Stock Exchange”). The Company together with its subsidiaries (collectively referred to as the
“Group”) is principally engaged in the acquisition, exploration, development and mining of mineral resources in the PRC. Particulars of the subsidiaries of the Company are set out in note 37. The Group considers that
China National Gold Group Co., Ltd. (“CNG”), a state owned company registered in Beijing, the PRC, which is controlled by State-owned Assets Supervision and Administration Commission of the State Council of the PRC, is able to exercise significant influence over the Company. The head office, principal address and registered and records office of the Company are located at Suite 1780, 400 Burrard Street, Vancouver, British Columbia, Canada, V6C 3A6. The consolidated financial statements are presented in United States Dollars (“US$”) which is also the functional currency of the Company. -
APPLICATION OF NEW AND AMENDMENTS TO IFRS ACCOUNTING STANDARDS Amendments to IFRS Accounting Standards that are mandatorily effective for the current year In the current year, the Group has applied the following amendments to IFRS Accounting Standards issued by
International Accounting Standards Board (the “IASB”) for the first time, which is mandatorily effective for the
Group’s annual period beginning on January 1, 2025 for the preparation of the consolidated financial statements: Amendments to IAS 21Lack of Exchangeability As the currencies that the Group had transacted in and the functional currencies of overseas entities for translation into the Group’s presentation currency were exchangeable, the application of the amendments to IFRS Accounting Standards in the current year has had no impact on the Group’s financial positions and performance for the current and prior years and/or on the disclosures set out in these consolidated financial statements. -
APPLICATION OF NEW AND AMENDMENTS TO IFRS ACCOUNTING STANDARDS (Cont’d) New and amendments to IFRS Accounting Standards in issue but not yet effective The Group has not early applied the following new and amendments to IFRS Accounting Standards that have been issued but are not yet effective: Amendments to IFRS 9Amendments to the Classification and Measurement of and IFRS 7 Financial Instruments 2 Amendments to IFRS 9Contracts Referencing Nature – dependent Electricity 2 and IFRS 7 Amendments to IFRS 10Sale or Contribution of Assets between an Investor and IAS 28 and its Associate or Joint Venture 1 IFRS 18Presentation and Disclosure in Financial Statement 3 IFRS 19 and its amendmentsSubsidiaries without Public Accountability: Disclosure 3 Amendments to IAS 21Translation to a Hyperinflationary Presentation Currency 3 Amendments to IFRS AccountingAnnual Improvement to IFRS Accounting Standards Standards – Volume 11 2 1 No mandatory effective date yet determined but available for adoption 2 Effective for annual periods beginning on or after January 1, 2026 3 Effective for annual periods beginning on or after January 1, 2027 Except for the new IFRS Accounting Standard mentioned below, the directors of the Company anticipate that
the application of other new and amendments to IFRS Accounting Standards will have no material impact on the
consolidated financial statements in the foreseeable future. IFRS 18 Presentation and Disclosure in Financial Statements IFRS 18 Presentation and Disclosure in Financial Statements, which sets out requirements on presentation and
disclosures in financial statements, will replace IAS 1 Presentation of Financial Statements. This new IFRS Accounting Standard, while carrying forward many of the requirements in IAS 1, introduces new requirements to present specified categories and defined subtotals in the statement of profit or loss; provide disclosures on management-defined
performance measures in the notes to the financial statements and improve aggregation and disaggregation of
information to be disclosed in the financial statements. In addition, some IAS 1 paragraphs have been moved to IAS 8 Accounting Policies, Changes in Accounting Estimates and Errors and IFRS 7 Financial Instruments: Disclosures. Minor amendments to IAS 7 Statement of Cash Flows and IAS 33 Earnings per Share are also made. IFRS 18, and amendments to other standards, will be effective for annual periods beginning on or after 1 January 2027, with early application permitted. The application of the new standard is expected to affect the presentation
of the statement of profit or loss and disclosures in the future financial statements. The Group is in the process of assessing the detailed impact of IFRS 18 on the Group’s consolidated financial statements. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 45 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION Basis of preparation of consolidated financial statements The consolidated financial statements have been prepared in accordance with IFRS Accounting Standards issued by the IASB. For the purpose of preparation of the consolidated financial statements, information is considered material if such information is reasonably expected to influence decisions made by primary users. In addition, the consolidated financial statements include applicable disclosures required by the Rules Governing the Listing of Securities on the Stock Exchange (“Listing Rules”) and by the Hong Kong Companies Ordinance (“Co”). The directors of the Company have, at the time of approving the consolidated financial statements, a reasonable
expectation that the Group has adequate resources to continue in operational existence for the foreseeable future. Thus they continue to adopt the going concern basis of accounting in preparing the consolidated financial statements. Material accounting policy information Basis of consolidation The consolidated financial statements incorporate the financial statements of the Company and entities controlled
by the Company and its subsidiaries. Control is achieved when the Company: • has power over the investee; • is exposed, or has rights, to variable returns from its involvement with the investee; and • has the ability to use its power to affect its returns. The Group reassesses whether or not it controls an investee if facts and circumstances indicate that there are changes to one or more of the three elements of control listed above. Consolidation of a subsidiary begins when the Group obtains control over the subsidiary and ceases when the Group loses control of the subsidiary. Profit or loss and each item of other comprehensive income are attributed to the owners of the Company and to the non-controlling interests. Total comprehensive income of subsidiaries is attributed to the owners of the Company and to the non-controlling interests even if this results in the non-controlling interests having a deficit balance. When necessary, adjustments are made to the financial statements of subsidiaries to bring their accounting policies in line with the Group’s accounting policies. All intragroup assets and liabilities, equity, income, expenses and cash flows relating to transactions between members of the Group are eliminated in full on consolidation. Non-controlling interests in subsidiaries are presented separately from the Group’s equity therein, which represent present ownership interests entitling their holders to a proportionate share of net assets of the relevant subsidiaries upon liquidation. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 46 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Revenue from contracts with customers The Group recognises revenue when (or as) a performance obligation is satisfied, i.e. when “control” of the goods or services underlying the particular performance obligation is transferred to the customer. A performance obligation represents a good or service (or a bundle of goods or services) that is distinct or a series of distinct goods or services that are substantially the same. Control is transferred over time and revenue is recognised over time by reference to the progress towards complete satisfaction of the relevant performance obligation if one of the following criteria is met: • the customer simultaneously receives and consumes the benefits provided by the Group’s performance as the Group performs; • the Group’s performance creates or enhances an asset that the customer controls as the Group performs; or • the Group’s performance does not create an asset with an alternative use to the Group and the Group has an enforceable right to payment for performance completed to date. Otherwise, revenue is recognised at a point in time when the customer obtains control of the distinct good or service. A contract asset represents the Group’s right to consideration in exchange for goods or services that the Group has transferred to a customer that is not yet unconditional. It is assessed for impairment in accordance with IFRS 9
Financial Instruments. In contrast, a receivable represents the Group’s unconditional right to consideration, i.e. only the passage of time is required before payment of that consideration is due. A contract liability represents the Group’s obligation to transfer goods or services to a customer for which the Group has received consideration (or an amount of consideration is due) from the customer. A contract asset and a contract liability relating to the same contract are accounted for and presented on a net basis. For contracts where the period between payment and transfer of the associated goods or services is less than one year, the Group applies the practical expedient for not adjusting the transaction price for any significant financing
component. Revenue is recognised at a point in time when control of the gold doré bars, copper and other by-products is passed to customers, i.e. when the products are delivered and titles have passed to customers. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 47 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Leases The Group assesses whether a contract is or contains a lease based on the definition under IFRS 16 at inception of the contract. Such contract will not be reassessed unless the terms and conditions of the contract are subsequently changed. The Group as a lessee Right-of-use assets The cost of right-of-use asset includes: • the amount of the initial measurement of the lease liability; • any lease payments made at or before the commencement date, less any lease incentives received; • any initial direct costs incurred by the Group; and • an estimate of costs to be incurred by the Group in dismantling and removing the underlying assets, restoring the site on which it is located or restoring the underlying asset to the condition required by the terms and
conditions of the lease. Right-of-use assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any remeasurement of lease liabilities. Right-of-use assets in which the Group is reasonably certain to obtain ownership of the underlying leased assets at the end of the lease term are depreciated from commencement date to the end of the useful life. Otherwise, right- of-use assets are depreciated on a straight-line basis over the shorter of its estimated useful life and the lease term. The Group presents right-of-use assets as a separate line item on the consolidated statement of financial position. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 48 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Foreign currencies In preparing the financial statements of each individual group entity, transactions in currencies other than the
functional currency of that entity (foreign currencies) are recognised at the rates of exchanges prevailing on the
dates of the transactions. At the end of the reporting period, monetary items denominated in foreign currencies are retranslated at the rates prevailing at that date. Non-monetary items carried at fair value that are denominated in
foreign currencies are retranslated at the rates prevailing on the date when the fair value was determined. When a fair value gain or loss on a non-monetary item is recognised in profit or loss, any exchange component of that gain or loss is also recognised in profit or loss. When a fair value gain or loss on a non-monetary item is recognised in
other comprehensive income, any exchange component of that gain or loss is also recognised in other comprehensive income. Non-monetary items that are measured in terms of historical cost in a foreign currency are not retranslated. Exchange differences arising on the settlement of monetary items, and on the retranslation of monetary items, are recognised in profit or loss in the period in which they arise. For the purposes of presenting the consolidated financial statements, the assets and liabilities of the Group’s operations are translated into the presentation currency of the Group (i.e. US$) using exchange rates prevailing at the end
of each reporting period. Income and expenses items are translated at the average exchange rates for the period.
Exchange differences arising, if any, are recognised in other comprehensive income and accumulated in equity under the heading of exchange reserve (attributed to non-controlling interests as appropriate). Borrowing costs Borrowing costs directly attributable to the acquisition, construction or production of qualifying assets, which are
assets that necessarily take a substantial period of time to get ready for their intended use or sale, are added to the cost of those assets until such time as the assets are substantially ready for their intended use or sale. All other borrowing costs are recognised in profit or loss in the period in which they are incurred. Taxation Income tax expense represents the sum of current and deferred income tax expense. The tax currently payable is based on taxable profit for the year. Taxable profit differs from profit/(loss) before income tax because of income or expense that are taxable or deductible in other years and items that are never taxable or deductible. The Group’s liability for current tax is calculated using tax rates that have been enacted or substantively enacted by the end of the reporting period. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 49 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Taxation (Cont’d) Deferred tax is recognised on temporary differences between the carrying amounts of assets and liabilities in
the consolidated financial statements and the corresponding tax bases used in the computation of taxable profit.
Deferred tax liabilities are generally recognised for all taxable temporary differences. Deferred tax assets are generally recognised for all deductible temporary differences to the extent that it is probable that taxable profits will be available against which those deductible temporary differences can be utilised. Such deferred tax assets and liabilities are not recognised if the temporary difference arises from the initial recognition (other than in a business combination) of
assets and liabilities in a transaction that affects neither the taxable profit nor the accounting profit and at the time of the transaction does not give rise to equal taxable and deductible temporary differences. Deferred tax liabilities are recognised for taxable temporary differences associated with investments in subsidiaries, except where the Group is able to control the reversal of the temporary difference and it is probable that the temporary difference will not reverse in the foreseeable future. Deferred tax assets arising from deductible temporary differences associated with such investments are only recognised to the extent that it is probable that there will be sufficient
taxable profits against which to utilise the benefits of the temporary differences and they are expected to reverse in the foreseeable future. The carrying amount of deferred tax assets is reviewed at the end of each reporting period and reduced to the
extent that it is no longer probable that sufficient taxable profits will be available to allow all or part of the asset to be recovered. Deferred tax assets and liabilities are measured at the tax rates that are expected to apply in the period in which the liability is settled or the asset is realised, based on tax rate (and tax laws) that have been enacted or substantively enacted by the end of the reporting period. The measurement of deferred tax liabilities and assets reflects the tax consequences that would follow from the
manner in which the Group expects, at the end of the reporting period, to recover or settle the carrying amount of its assets and liabilities. For ultimate costs incurred for provisions for environmental rehabilitation, the Group applies IAS 12 requirements to the provisions for environmental rehabilitation and the related assets separately. The Group recognises a deferred
tax asset related to provisions for environmental rehabilitation to the extent that it is probable that taxable profit will be available against which the deductible temporary difference can be utilised and a deferred tax liability for all
taxable temporary differences. Deferred tax assets and liabilities are offset when there is a legally enforceable right to set off current tax assets
against current tax liabilities and when they relate to income taxes levied to the same taxable entity by the same
taxation authority. Current and deferred tax are recognised in profit or loss. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 50 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Cash and cash equivalents Cash and cash equivalents presented on the consolidated statement of financial position comprises of cash on hand and demand deposits. Inventories Inventories are stated at the lower of cost and net realisable value. Costs of inventories are determined using the
weighted average cost method. Net realisable value is the estimated selling price in the ordinary course of business less the estimated costs of completion and the estimated costs necessary to make the sale. Costs necessary to make the sale include incremental costs directly attributable to the sale and non-incremental costs which the Group must incur to make the sale. Gold in process inventory Gold in process inventory consists of gold contained in the ore on leach pads and in-circuit material within processing operations. Production costs are capitalised and included in gold in process inventory based on the current mining and processing cost incurred up to the point prior to the refining process including the cost of raw materials and direct labour;
mine-site overhead expenses; stripping costs; and allocated indirect costs, including depreciation and depletion of mining interests. Gold doré bars inventory Gold doré bar is gold awaiting refinement and gold refined and ready for sales. The recovery of gold from ore is
achieved through a heap leaching process. Under this method, ore is placed on leach pads where it is treated with a chemical solution which dissolves the gold contained in the ore. The resulting “pregnant” solution is further processed in a plant where the gold is recovered. Costs are subsequently recycled from ore on leach pads as ounces of gold are recovered based on the average cost per recoverable ounce on the leach pad. Estimates of recoverable gold on the leach pads are calculated from the quantities of ore placed on the leach pads (measured in tonnes added to
the leach pads), the grade of the ore placed on the leach pads (based on assay data), and a recovery percentage (based on ore type). Others Copper inventory is copper and other by-products after metallurgical processing and ready for sales. Consumables used in operations, such as fuel, chemicals, and reagents and spare parts inventory are valued at the lower of cost or net realisable value. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 51 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Inventories (Cont’d) Provisions Provisions are recognised when the Group has a present obligation (legal or constructive) as a result of a past event, it is probable that the Group will be required to settle that obligation, and a reliable estimate can be made of the
amount of the obligation. The amount recognised as a provision is the best estimate of the consideration required to settle the present obligation at the end of the reporting period, taking into account the risks and uncertainties surrounding the obligation. When a provision is measured using the cash flows estimated to settle the present obligation, its carrying amount is the
present value of those cash flows (where the effect of the time value of money is material). Contingent liabilities A contingent liability is a present obligation arising from past events but is not recognised because it is not probable that an outflow of resources embodying economic benefits will be required to settle the obligation. Where the Group is jointly and severally liable for an obligation, the part of the obligation that is expected to be met by other parties is treated as a contingent liability and it is not recognised in the consolidated financial statements. The Group assesses continually to determine whether an outflow of resources embodying economic benefits has
become probable. If it becomes probable that an outflow of future economic benefits will be required for an item
previously dealt with as a contingent liability, a provision is recognised in the consolidated financial statements in
the reporting period in which the change in probability occurs, except in the extremely rare circumstances where
no reliable estimate can be made. Environmental rehabilitation An obligation to incur restoration, rehabilitation and environmental costs arises when environmental disturbance is caused by the development or ongoing production of a mining property. Such costs arising from the decommissioning of plant and other site preparation work, discounted to their net present value, are provided for and capitalised as part of the related property, plant and equipment at the start of each project, as soon as the obligation to incur such costs arises. These costs are recognised in profit or loss over the life of the operation, through depreciation of the asset. Costs for restoration of subsequent site damage which is created on an ongoing basis during production are recognised in profit or loss. Changes in the measurement of a liability relating to the decommissioning of plant or other site preparation work
that result from changes in the estimated timing or amount of the cash flow, including the effects of inflation and
movements in foreign exchange rates, revisions to estimated reserves, resources and lives of operations, or a change in the discount rate, are added to, or deducted from, the cost of the related asset in the period it occurred. The
periodic unwinding of discount is recognised in profit or loss as a finance cost as it occurs. If a decrease in the
liability exceeds the carrying amount of the asset, the excess is recognised immediately in profit or loss. If the asset value is increased and there is an indication that the revised carrying value is not recoverable, an impairment test is performed in accordance with the Group’s accounting policy. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 52 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Property, plant and equipment Property, plant and equipment are tangible assets that are held for use in the production or supply of goods or
services, or for administrative purposes (other than construction in progress as described below). Property, plant
and equipment are stated in the consolidated statement of financial position at cost less subsequent accumulated depreciation and subsequent accumulated impairment losses, if any. Depreciation is recognised so as to write off the cost of assets other than properties under construction less their
residual values over their estimated useful lives, using the straight-line method. The estimated useful lives, residual values and depreciation method are reviewed at the end of each reporting period, with the effect of any changes in estimate accounted for on a prospective basis. Assets under construction in progress are carried at cost, less any recognised impairment loss. Costs include any costs directly attributable to bringing the asset to the location and condition necessary for it to be capable of operating in the manner intended by management, including costs of testing whether the related assets is functioning properly and, for qualifying assets, borrowing costs capitalised in accordance with the Group’s accounting policy. Depreciation of these assets, on the same basis as other property assets, commences when the assets are ready for their intended use. When the Group makes payments for ownership interests of properties which includes both leasehold land and building elements, the entire consideration is allocated between the leasehold land and the building elements in proportion to the relative fair values at initial recognition. To the extent the allocation of the relevant payments can be made
reliably, interest in leasehold land is presented as “right-of-use assets” in the consolidated statement of financial
position. When the consideration cannot be allocated reliably between non-lease building element and undivided
interest in the underlying leasehold land, the entire properties are classified as property, plant and equipment. An item of property, plant and equipment is derecognised upon disposal or when no future economic benefits are expected to arise from the continued use of the asset. Any gain or loss arising on the disposal or retirement of an item of property, plant and equipment is determined as the difference between the sales proceeds and the carrying amount of the asset and is recognised in profit or loss. Exploration and evaluation expenditure Drilling and related costs incurred on sites without an existing mine and on areas outside the boundary of a known mineral deposit which contains proven and probable reserves are exploration and evaluation expenditure and are
expensed as incurred up to the date on which costs incurred are economically recoverable. Further exploration and evaluation expenditures, subsequent to the establishment of economic recoverability, are capitalised and included
in the carrying amount of the mineral assets. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 53 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Property, plant and equipment (Cont’d) Exploration and evaluation expenditure (Cont’d) The Management evaluates the following criteria in its assessment of economic recoverability and probability of
future economic benefit: • Geology – whether or not there is sufficient geologic and economic certainty of being able to convert a residual mineral deposit into a proven and probable reserve at a development stage or production stage mine, based on the known geology and metallurgy. A history of conversion of resources to reserves at operating mines is
used to support the likelihood of conversion. • Scoping – there is a scoping study or preliminary feasibility study that demonstrates the additional resources will generate a positive commercial outcome. Known metallurgy provides a basis for concluding there is a
significant likelihood of being able to recoup the incremental costs of extraction and production. • Accessible facilities – mining property can be processed economically at accessible mining and processing
facilities where applicable. • Life of mine plans – an overall life of mine plan and economic model to support the mine and the economic extraction of resources/reserves exists. A long-term life of mine plan, and supporting geological model identifies the drilling and related development work required to expand or further define the existing orebody. • Authorizations – operating permits and feasible environmental programs exist or are obtainable. Therefore prior to capitalising exploration drilling and related costs, the Management determines that the following conditions have been met that will contribute to future cash flows: • There is a probable future benefit that will contribute to future cash inflows; • The Group can obtain the benefit and controls access to it; • The transaction or event giving rise to the future benefit has already occurred; and • Costs incurred can be measured reliably. Development expenditure Drilling and related costs incurred to define and delineate a mineral deposit are capitalised as part of mineral assets in the period incurred, when the Management determines that there is sufficient evidence that the expenditure will result in a probable future economic benefit to the Group. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 54 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Property, plant and equipment (Cont’d) Production expenditure A mine that is under construction is determined to enter the production stage when the project is in the position and condition necessary for it to be capable of operating in the manner intended by the Management. Therefore, such costs incurred are capitalised as part of the mineral assets. Mine development costs incurred to maintain current production are included in cost of inventories. For those areas being developed which will be mined in future periods, the costs incurred are capitalised and depleted when the
related mining area is mined. Depreciation Mineral assets are depreciated using the unit-of-production method based on the actual production volume over the estimated total recoverable ounces contained in proven and probable reserves at the related mine when the mine is capable of operating as intended by the Management. The Management reviews the estimated total recoverable ounces contained in proven and probable reserves at the end of each reporting period and when events and circumstances indicate that such a review should be made. Changes to estimated total recoverable ounces contained in proven and probable reserves are accounted for prospectively. Assets under construction are not depreciated until they are substantially complete and available for their intended use. Leasehold improvements are depreciated over the shorter of the lease term and the estimated useful lives of the assets. Mining rights Mining rights are amortised using the unit-of-production method based on the actual production volume over the
estimated total recoverable ounces contained in proven and probable reserves at the related mine. Mining rights acquired in a business combination Mining rights acquired in a business combination are recognised separately from goodwill and are initially recognised at their fair value at the acquisition date (which is regarded as their cost). Subsequent to initial recognition, mining rights with finite useful lives are carried at costs less accumulated amortisation and any accumulated impairment losses. Amortisation is provided using the unit-of-production method based on the actual production volume over the estimated total proven and probable reserves of the ore mines. Variable payments for acquiring mining rights that are not part of a business combination Variable payments that are dependent on the Group’s future activity (including payments based on sales, revenues or outputs produced) are recognised in profit or loss in the period in which they arise. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 55 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Other non-current assets The right to receive a block of buildings and twenty car parks included under “other non-current assets” is carried at cost less accumulated impairment, if any. Impairment of property, plant and equipment, right-of-use assets, mining rights and other non-current assets At the end of the reporting period, the Group reviews the carrying amounts of its property, plant and equipment,
right-of-use assets, mining rights and other non-current assets to determine whether there is any indication that
those assets have suffered an impairment loss. If any such indication exists, the recoverable amount of the relevant asset is estimated in order to determine the extent of the impairment loss, if any. The recoverable amounts of property, plant and equipment, right-of-use assets, mining rights and other non-current assets are estimated individually. When it is not possible to estimate the recoverable amount individually, the Group estimates the recoverable amount of the cash-generating unit (“CGU”) to which the asset belongs. In testing a
CGU for impairment, corporate assets are allocated to the relevant CGU when a reasonable and consistent basis of allocation can be established, or otherwise they are allocated to the smallest group of CGUs for which a reasonable and consistent allocation basis can be established. The recoverable amount is determined for the CGU or group
of CGUs to which the corporate asset belongs, and is compared with the carrying amount of the relevant CGU or
group of CGUs. Recoverable amount is the higher of fair value less costs of disposal and value in use (“VIU”). In assessing VIU, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the asset (or a CGU) for which the estimates of future cash flows have not been adjusted. If the recoverable amount of an asset (or a CGU) is estimated to be less than its carrying amount, the carrying
amount of the asset (or a CGU) is reduced to its recoverable amount. For corporate assets or portion of corporate assets which cannot be allocated on a reasonable and consistent basis to a CGU, the Group compares the carrying amount of a group of CGUs, including the carrying amounts of the corporate assets or portion of corporate assets
allocated to that group of CGUs, with the recoverable amount of the group of CGUs. In allocating the impairment loss, the impairment loss is allocated first to reduce the carrying amount of any goodwill (if applicable) and then to the
other assets on a pro-rata basis based on the carrying amount of each asset in the unit or the group of CGUs. The carrying amount of an asset is not reduced below the highest of its fair value less costs of disposal (if measurable), its VIU (if determinable) and zero. The amount of the impairment loss that would otherwise have been allocated to the asset is allocated pro rata to the other assets of the unit or the group of CGUs. An impairment loss is recognised immediately in profit or loss. Where an impairment loss subsequently reverses, the carrying amount of the asset (or a CGU or a group of CGUs) is increased to the revised estimate of its recoverable amount, but so that the increased carrying amount does not exceed the carrying amount that would have been determined had no impairment loss been recognised for the asset (or a CGU or a group of CGUs) in prior years. A reversal of an impairment loss is recognised immediately in profit or loss. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 56 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Research and development expenses Expenditure on research activities is recognised as an expense in the period in which it is incurred. Development
expenditure that is not recognised as an internally-generated intangible asset is recognised in profit or loss in the
period in which it is incurred. Financial instruments Financial assets and financial liabilities are initially measured at fair value except for trade receivables arising from contracts with customers which are initially measured in accordance with IFRS 15. Transaction costs that are directly attributable to the acquisition or issue of financial assets and financial liabilities (other than financial assets or financial liabilities at fair value through profit or loss (“FVTPL”)) are added to or deducted from the fair value of financial assets or financial liabilities, as appropriate, on initial recognition. Transaction costs directly attributable to the acquisition of financial assets or financial liabilities at FVTPL are recognised immediately in profit or loss. The effective interest method is a method of calculating the amortised cost of a financial asset or financial liability and of allocating interest income and interest expense over the relevant period. The effective interest rate is the rate that exactly discounts estimated future cash receipts and payments (including all fees and points paid or received that form an integral part of the effective interest rate, transaction costs and other premiums or discounts) through the expected life of the financial asset or financial liability, or, where appropriate, a shorter period, to the net carrying amount on initial recognition. Financial assets Classification and subsequent measurement of financial assets Financial assets that meet the following conditions are subsequently measured at amortised cost: • the financial asset is held within a business model whose objective is to collect contractual cash flows; and • the contractual terms give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding. Debt instruments that meet the following conditions are subsequently measured at FVTOCI: • the financial asset is held within a business model whose objective is achieved by both collecting contractual cash flows and selling the financial assets; and • the contractual terms give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 57 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Financial instruments (Cont’d) Financial assets (Cont’d) Classification and subsequent measurement of financial assets (Cont’d) All other financial assets are subsequently measured at FVTPL, except that at initial recognition of a financial
asset the Group may irrevocably elect to present subsequent changes in fair value of an equity investment in other comprehensive income if that equity investment is neither held for trading nor contingent consideration recognised by an acquirer in a business combination to which IFRS 3 Business Combinations applies. In addition, the Group may irrevocably designate a financial asset that is required to be measured at the amortised cost or FVTOCI as measured at FVTPL if doing so eliminates or significantly reduces an accounting mismatch. Equity instruments designated as at FVTOCI Investments in equity instruments at FVTOCI are subsequently measured at fair value with gains and losses arising from changes in fair value recognised in other comprehensive income and accumulated in the investments revaluation reserve; and are not subject to impairment assessment. The cumulative gain or loss will not be reclassified to profit or loss on disposal of the equity investments, and will be transferred to retained profits. Dividends from these investments in equity instruments are recognised in profit or loss when the Group’s right to
receive the dividends is established, unless the dividends clearly represent a recovery of part of the cost of the
investment. Dividends are included in the “interest and other income” line item in profit or loss. Impairment of financial assets subject to impairment assessment under IFRS 9 The Group performs impairment assessment under expected credit loss (“ECL”) model on financial assets (including trade receivables, other receivables, amounts due from related companies, term deposits, cash and cash equivalents and restricted balances) which are subject to impairment assessment under IFRS 9. The amount of ECL is updated at each reporting date to reflect changes in credit risk since initial recognition. Simplified approach For trade receivables that do not contain a significant financing component, the Group applies simplified approach in calculating ECLs. Under the simplified approach, the Group does not track changes in credit risk, but instead
recognises a loss allowance based on lifetime ECLs at each reporting date. Lifetime ECL represents the ECL that will result from all possible default events over the expected life of the relevant instrument. In contrast, 12-month ECL (“12m ECL”) represents the portion of lifetime ECL that is expected to result from default events that are possible within 12 months after the reporting date. Assessments are done based on
the Group’s historical credit loss experience, adjusted for factors that are specific to the debtors, general economic conditions and an assessment of both the current conditions at the reporting date as well as the forecast of future conditions. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 58 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Financial instruments (Cont’d) Financial assets (Cont’d) Impairment of financial assets subject to impairment assessment under IFRS 9 (Cont’d) Other than trade receivables, at each reporting date, the Group assesses whether the credit risk on a financial
instrument has increased significantly since initial recognition. When making the assessment, the Group compares the risk of a default occurring on the financial instrument as at the reporting date with the risk of a default occurring on the financial instrument as at the date of initial recognition and considers reasonable and supportable information that is available without undue cost or effort, including historical and forward-looking information. The Group considers that there has been a significant increase in credit risk when contractual payments are more than 30 days past due. The Group considers a financial asset in default when contractual payments are 90 days past due. However, in
certain cases, the Group may also consider a financial asset to be in default when internal or external information indicates that the Group is unlikely to receive the outstanding contractual amounts in full before taking into account any credit enhancements held by the Group. A financial asset is written off when there is no reasonable expectation of recovering the contractual cash flows. The measurement of ECL is a function of the probability of default, loss given default (i.e. the magnitude of the loss if there is a default) and the exposure at default. The assessment of the probability of default and loss given default is based on historical data and forward-looking information. Estimation of ECL reflects an unbiased and probability- weighted amount that is determined with the respective risks of default occurring as the weights. Generally, the ECL is the difference between all contractual cash flows that are due to the Group in accordance with the contract and the cash flows that the Group expects to receive, discounted at the effective interest rate determined at initial recognition. The Group recognises an impairment gain or loss in profit or loss for all financial instruments by adjusting their
carrying amount, with the exception of trade receivables where the corresponding adjustment is recognised through a loss allowance account. Foreign exchange gains and losses The carrying amount of financial assets that are denominated in a foreign currency is determined in that foreign
currency and translated at the spot rate at the end of each reporting period. Specifically: • For financial assets measured at amortised cost, exchange differences are recognised in profit or loss in the
“foreign exchange loss, net” line item in profit or loss; • For equity instruments measured at FVTOCI, exchange differences are recognised in other comprehensive
income in the investments revaluation reserve. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 59 -
- BASIS OF PREPARATION OF CONSOLIDATED FINANCIAL STATEMENTS AND MATERIAL
ACCOUNTING POLICY INFORMATION (Cont’d) Material accounting policy information (Cont’d) Financial instruments (Cont’d) Financial assets (Cont’d) Derecognition of financial assets The Group derecognises a financial asset only when the contractual rights to the cash flows from the asset expire, or when it transfers the financial asset and substantially all the risks and rewards of ownership of the asset to another entity. On derecognition of a financial asset measured at amortised cost, the difference between the asset’s carrying amount and the sum of the consideration received and receivable is recognised in profit or loss. On derecognition of an investment in equity instrument which the Group has elected on initial recognition to measure at FVTOCI, the cumulative gain or loss previously accumulated in the investments revaluation reserve is not reclassified to profit or loss, but is transferred to retained profits. Financial liabilities and equity instruments Classification as debt or equity Debt and equity instruments issued by a group entity are classified as either financial liabilities or as equity in
accordance with the substance of the contractual arrangements and the definitions of a financial liability and an
equity instrument. Equity instruments An equity instrument is any contract that evidences a residual interest in the assets of an entity after deducting all of its liabilities. Equity instruments issued by the Company are recognised at the proceeds received, net of direct
issue costs. Financial liabilities at amortised cost Financial liabilities including borrowings, entrusted loan payable, accounts and other payables are initially measured at fair value, net of transaction costs, and are subsequently measured at amortised cost using the effective interest method. Foreign exchange gains and losses For financial liabilities that are denominated in a foreign currency and are measured at amortised cost at the end
of each reporting period, the foreign exchange gains and losses are determined based on the amortised cost of the instruments. These foreign exchange gains and losses are recognised in the “foreign exchange loss, net” line item in profit or loss. Derecognition of financial liabilities The Group derecognises financial liabilities when, and only when, the Group’s obligations are discharged, cancelled or have expired. The difference between the carrying amount of the financial liability derecognised and the consideration paid and payable is recognised in profit or loss. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 60 -
- CRITICAL ACCOUNTING JUDGEMENT AND KEY SOURCES OF ESTIMATION UNCERTAINTY
In the application of the Group’s accounting policies, the directors of the Company are required to make judgements,
estimates and assumptions about the carrying amounts of assets and liabilities that are not readily apparent from
other sources. The estimates and underlying assumptions are based on historical experience and other factors that are considered to be relevant. Actual results may differ from these estimates. The estimates and underlying assumptions are reviewed on an on-going basis. Revisions to accounting estimates
are recognised in the period in which the estimate is revised if the revision affects only that period, or in the period of the revision and future periods if the revision affects both current and future periods. Key sources of estimation uncertainty The following are the key assumptions concerning the future, and other key sources of estimation uncertainty at the end of the reporting period that may have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year. (a) Impairment of non-financial assets In determining whether an asset is impaired or the event previously causing the impairment no longer exists, the Group has to exercise judgement in the area of asset impairment, particularly in assessing: (i) whether an event has occurred that may affect the asset value or such event affecting the asset value
has not been in existence; (ii) whether the carrying value of an asset or a CGU can be supported by the recoverable amount of the CGU, which is the higher of fair value less costs of disposal and value-in- use of the CGU. The value-in-use
calculation is based on the net present value of future cash flows which are estimated based upon the continued use of the asset or CGU, or derecognition; and (iii) the appropriate key assumptions to be applied in preparing cash flow projections including whether
these cash flow projections are discounted using an appropriate rate. Changing the assumptions selected by management to determine the level of impairment, including the discount rates or the growth rate
assumptions in the cash flow projections, could materially affect the net present value used in the
impairment test. (b) Inventories The Group records the cost of gold mining ore placed on its leach pads and in process at its mine as gold in process inventory, and values gold in process inventory at the lower of cost and estimated net realisable value. The assumptions used in the valuation of gold in process inventories include estimates of gold contained in the ore placed on leach pads, and the amount of gold that is expected to be recovered from the ore placed on leach pads. If these estimates or assumptions are proven inaccurate, the Group could be required to write down the recorded value of its gold in process inventories. During the year, there is no change in the relevant estimation. Although the quantities of recoverable gold placed on the leach pad and the processing plant are reconciled by comparing the grades of ore placed on the leach pad to the quantities actually recovered, the nature of the leaching process inherently limits the ability to precisely monitor inventory levels. The actual recovery of gold from the leach pad is not known until the leaching process has concluded at the end of the mine life. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 61 -
- CRITICAL ACCOUNTING JUDGEMENT AND KEY SOURCES OF ESTIMATION UNCERTAINTY
(Cont’d) Key sources of estimation uncertainty (Cont’d) (b) Inventories (Cont’d) The Management periodically reassesses the assumptions used in the valuation of gold in process, particularly the estimated recovery rate to calculate the amount of gold that is expected to be recovered from the ore placed on leach pads (the “Estimated Recovery Rate”). As of December 31, 2025, the Group applies an Estimated
Recovery Rate derived from metallurgical recovery assumptions disclosed in the NI 43-101 technical report
and adjusted, where appropriate, based on current operating conditions and historical performance. An increase/decrease in the Estimated Recovery Rate by ±3 percentage points would lead to a decrease/ increase in the average production cost of gold doré bars by US$11.7 million. During the year, there is no
change in the relevant estimation. The carrying amounts of gold in process and gold doré bars as at December 31, 2025 and 2024 are disclosed in note 17. (c) Contingency The Group is involved in a legal proceeding with an independent mine construction contractor of Huatailong and has applied judgement on whether it is probable that an outflow of economic benefits will be required by taking into account the new evidences and materials collected and the legal advice. Disclosures has been set out in note 31(iii) and no related provision has been made as of December 31, 2025. (d) Depreciation and amortisation of mining related assets and reserves estimates As explained in note 3, mineral assets and mining rights are depreciated and amortised using the units of
production method based on the proved and probable mineral reserves. Engineering estimates of the Group’s mineral reserves are inherently imprecise and represent only approximate amounts because of the subjective judgements involved in developing such information. There is a national
standard set by the PRC Government regarding the engineering criteria that have to be met before estimated mineral reserves can be designated as “proved and probable”. Proved and probable mineral reserve estimates are updated at regular basis and have taken into account recent production and technical information about each mine. In addition, as prices and cost levels change from year to year, the estimate of proved and probable gold reserves also changes. This change is considered a change in estimate for accounting purposes and is
reflected on a prospective basis in related depreciation rates. Despite the inherent imprecision in these engineering estimates, these estimates are used in determining
depreciation and amortisation expenses. Depreciation rates are determined based on estimated proved and
probable gold reserve quantity (the denominator) and capitalised costs of mineral assets and mining rights
(the numerator). The capitalised cost of mineral assets and mining rights are amortised based on the units of gold equivalent metal volume produced. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 62 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 63 -
- REVENUE AND SEGMENT INFORMATION Revenue (i) Disaggregation of revenue from contracts with customers The following is an analysis of the Group’s revenue from its major products and service: 20252024 US$’000US$’000 At a point in time Gold doré bars338,473246,946 Copper495,555283,224 Other by-products and service (note)476,098226,476
Total revenue1,310,125756,646
Note: Other by-products mainly consist of molybdenum, silver, lead and zinc. Other services consist of transportation services, which
contribute to less than 1% (2024: less than 1%) of total revenue of the Group during the year ended December 31, 2025.
(ii) Performance obligations for contracts with customers
The Group sells gold doré bars, copper and other by-products directly to customers. Revenue is recognised
at a point in time when control of the gold doré bars, copper and other by-products is passed to customers,
i.e. when the products are delivered and titles have passed to customers. A contract liability represents the
Group’s obligation to transfer goods or services to a customer for which the Group has received consideration
(or an amount of consideration is due) from the customer.
All sales of gold doré bars, copper and other by-products are for periods of one year or less. As permitted under
IFRS 15, the transaction price allocated to these unsatisfied contracts is not disclosed.
- REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information
IFRS 8 Operating Segment requires operating segments to be identified on the basis of internal reports that are
regularly reviewed by the chief operating decision-maker (“CODM”) to allocate resources to the segments and to
assess their performance. The CODM, who is responsible for allocating resources and assessing performance of the operating segments, has been defined as the executive directors of the Company. The CODM has identified two operating and reportable
segments as follows: (i) The mine-produced gold segment – the production of gold doré bars through the Group’s integrated processes, i.e., mining, metallurgical processing, production and selling of gold doré bars to external clients. (ii) The mine-produced copper concentrate segment – the production of copper concentrate including other by- products through the Group’s integrated processes, i.e., mining, metallurgical processing, production and selling copper concentrate including other by-products to external clients. Information regarding the above segments is reported below. (a) Segment revenue and results The following is an analysis of the Group’s revenue and results by operating and reportable segment: For the year ended December 31, 2025 Mine – Mine –produced producedcopperSegment goldconcentratetotalUnallocatedConsolidated US$’000US$’000US$’000US$’000US$’000 Revenue – external and segment revenue338,473971,6521,310,125–1,310,125 Cost of sales(164,876)(461,258)(626,134)–(626,134)
Mining operating earnings173,597510,394683,991–683,991
Income (loss) from operations172,464421,723594,187(4,062)590,125 Foreign exchange gain (loss), net105(458)(353)4(349) Interest and other income4,5684,2178,7852,94611,731 Other expenses–(22,538)(22,538)–(22,538) Finance costs(344)(14,428)(14,772)(4,032)(18,804)
Profit (loss) before income tax176,793388,516565,309(5,144)560,165
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 64 -
- REVENUE AND SEGMENT INFORMATION (Cont’d) Segment information (Cont’d) (a) Segment revenue and results (Cont’d) For the year ended December 31, 2024 Mine – Mine –produced producedcopperSegment goldconcentratetotalUnallocatedConsolidated US$’000US$’000US$’000US$’000US$’000 Revenue – external and segment revenue246,946509,700756,646–756,646 Cost of sales(165,574)(404,152)(569,726)–(569,726)
Mining operating earnings81,372105,548186,920–186,920
Income (loss) from operations80,93446,244127,178(3,984)123,194 Foreign exchange loss, net(2,087)(296)(2,383)(178)(2,561) Interest and other income2,6152582,8732,2365,109 Other expenses–(10,132)(10,132)–(10,132) Finance costs(404)(17,054)(17,458)(4,932)(22,390)
Profit (loss) before income tax81,05819,020100,078(6,858)93,220
The accounting policies of the operating segments are the same as the Group’s accounting policies. Segment
results represent profit (loss) before income tax without allocation of certain general and administrative
expenses, foreign exchange loss, other expenses, interest and other income and finance costs, attributable
to the respective segment. This is the measure reported to the CODM for the purposes of resource allocation
and performance assessment.
There are no inter-segment sales for the years ended December 31, 2025 and 2024.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 65 -
- REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information (Cont’d)
(b) Segment assets and liabilities
The following is an analysis of the Group’s assets and liabilities by segment representing assets/liabilities directly
attributable to the respective segment:
Mine –
Mine –produced
producedcopperSegment
goldconcentratetotalUnallocatedConsolidated
US$’000US$’000US$’000US$’000US$’000
As of December 31, 2025
Total assets750,9102,451,1313,202,041154,4943,356,535
Total liabilities50,237887,806938,04381,4661,019,509
As of December 31, 2024
Total assets599,9082,266,6112,866,51969,4602,935,979
Total liabilities34,8861,033,5761,068,46281,3111,149,773
For the purposes of monitoring segment performance and allocating resources between segments:
• all assets are allocated to operating segments other than certain cash and cash equivalents, other
receivables, prepaid expenses and deposits, right-of-use assets, property, plant and equipment and equity instruments at FVTOCI; and • all liabilities are allocated to operating segments other than other payables and accrued expenses, lease liabilities, deferred income and certain borrowings. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 66 -
- REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information (Cont’d)
(c) Other segment information (included in the measure of segment profit or loss or segment assets regularly provided
to the CODM)
Mine –
Mine –produced
producedcopperSegment
goldconcentratetotalUnallocatedConsolidated
US$’000US$’000US$’000US$’000US$’000
For the year ended
December 31, 2025 Additions of property, plant and equipment7,27643,45350,729–50,729 Additions of right-of-use assets14162,80762,94820663,154 Additions of intangible assets–150150–150 Depreciation of property, plant and equipment(36,882)(95,116)(131,998)–(131,998) Amortisation of intangible assets(719)(28,364)(29,083)–(29,083) Depreciation of right-of-use assets(3,318)(1,543)(4,861)(57) (4,918) For the year ended
December 31, 2024 Additions of property, plant and equipment6,31128,02734,338–34,338 Additions of right-of-use assets–11,21711,217–11,217 Depreciation of property, plant and equipment(54,408)(66,877)(121,285)–(121,285) Amortisation of intangible assets(788)(19,118)(19,906)–(19,906) Depreciation of right-of-use assets(3,606)(1,071)(4,677)(99)(4,776) NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 67 -
- REVENUE AND SEGMENT INFORMATION (Cont’d)
Segment information (Cont’d)
(d) Geographical information
The Group operated in two geographical areas, Canada and the PRC. The Group’s corporate division located
in Canada does not have any revenue and therefore is not presented as an operating segment. During the
years ended December 31, 2025 and 2024, the Group’s revenue was generated from gold sales and copper multi-products to customers in the PRC. Approximately 99% (2024: 98%) of non-current assets (excluding
equity instruments at FVTOCI) of the Group are located in the PRC. (e) Information about major customers Revenue from major customers which accounts for 10% or more of the Group’s total revenue are sales of
gold doré bars and copper concentrate including other by-products to CNG and its subsidiaries as disclosed in note 30(a). No third-party customers of the corresponding years contribute over 10% or more of the total
sales of the Group. - GENERAL AND ADMINISTRATIVE EXPENSES Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Administration and office9,8376,918 Depreciation of property, plant and equipment7,0726,867 Depreciation of right-of-use assets5499 Professional fees4,9486,492 Salaries and benefits21,34418,192 Others16,6798,998
Total general and administrative expenses59,93447,566
- OTHER EXPENSES Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Penalties on occupation of grasslands–8,739 Provision for litigation compensation and related interest charge15,8781,393 Impairment loss on other non-current assets (note 22)5,879– Others781–
Total other expenses22,53810,132
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 68 -
- FINANCE COSTS
Year endedYear ended
December 31,December 31,
20252024
US$’000US$’000
Interests on borrowings15,08119,527
Interests on lease liabilities84866
Interests on provision of the variable payment
arising from the mining right721425 Accretion on environmental rehabilitation (note 28)2,7472,811
19,39722,829 Less: Amounts capitalised to property, plant and equipment(593)(439)
Total finance costs18,80422,390
Interest has been capitalised at a capitalisation rate representing the weighted average interest to general borrowings. Year endedYear ended December 31,December 31, 20252024 %% Capitalisation rate1.892.07
- INCOME TAX EXPENSE/DEFERRED TAXATION The Company was incorporated in Canada and is subject to Canadian federal and provincial tax requirements which are calculated at 27% (2024: 27%) of the estimated assessable profit for the year ended December 31, 2025. PRC Enterprise Income Tax (“EIT”) is calculated at the prevailing tax rate of 25% (2024: 25%) on the estimated taxable profit of the group entities located in the PRC for the year ended December 31, 2025 except as described below. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 69 -
- INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d)
Pursuant to the Enterprise Income Tax Law (the “EIT” Law) effective on January 1, 2008, Inner Mongolia Pacific
Mining Co., Ltd. (“IMP”) is a certified “High and New Technology Enterprise” which is entitled to a preferential tax rate of 15% (2024: 15%) for three years from the year ended December 31, 2024 and eligible for renewal every
three years. Such certificate will be expired in December 2027. Pursuant to the Tibet Administration (2022) No. 11 Notice on Provisional Implementation Measures on Enterprise
Income Tax (“Notice No.11”), effective on April 29, 2022, Huatailong, which is certified as a “High and New Technology Enterprise” is entitled to preferential tax rate of 15% (2024: 15%) for three years from the year ended December 31, 2024 and eligible for renewal every three years. Such certificate will be expired in December 2027. Additionally, as Huatailong was established in the westward development area of the PRC, it enjoys an exemption from local income tax, which is set to expire on December 31, 2025. As such, Huatailong is entitled to a reduced preferential tax rate of 9% for the years ended December 31, 2025 and 2024. In February 2026, the local policy further extended the preferential tax rate for another 2 years period and will be expired in December 2027. Pursuant to Notice No.11, Metrorkongka County Jiama Industry and Trade Co., Ltd. (“Jiama Industry and Trade”), established in the westward development area of the PRC, employs 70% or more of its employees who are Tibet
Permanent Residents and enjoys the exemption on local income tax, thus Jiama Industry and Trade is entitled to a reduced preferential tax rate of 15% for the years ended December 31, 2025 and 2024. Under the EIT Law and Implementation Regulation of the EIT Law, except for the preferential treatments available to certain subsidiaries as mentioned above, other subsidiaries within the Group operating in the PRC are subject to EIT at the statutory rate of 25% during the years ended December 31, 2025 and 2024. Under relevant PRC Tax Law, withholding tax is imposed on dividends declared in respect of profits earned by the PRC subsidiaries from January 1, 2008 onwards. Except the Group has recognised deferred taxation US$23,491,000 (2024: US$3,690,000) on retained profits of the PRC subsidiary of US$234,905,000 (2024: US$36,902,000) for the year ended December 31, 2025, no deferred taxation has been provided for in the consolidated financial statements in respect of temporary differences attributable to accumulated distributable profits of the other PRC subsidiaries
amounting to approximately US$1,062,565,000 at December 31, 2025 (2024: US$774,487,000) as the Group is
able to control the timing of the reversal of temporary differences and it is probable the temporary differences will not reverse in the foreseeable future. Taxation for other relevant jurisdictions is calculated at the rates prevailing in each of those jurisdictions respectively. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 70 -
- INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d)
Tax expense comprises:
Year endedYear ended
December 31,December 31,
20252024
US$’000US$’000
Current tax:
PRC EIT56,71914,741
PRC withholding income tax on profit earned from
PRC subsidiaries7,3892,696 Underprovision in prior year – PRC EIT77206
64,18517,643
Deferred tax:
PRC EIT3,8656,589
PRC withholding income tax on profit earned from
PRC subsidiaries19,8003,690
23,66510,279
Total income tax expense87,85027,922
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 71 -
- INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) The income tax expense for the Group can be reconciled to the profit before income tax for the year as follows: Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Profit before income tax560,16593,220
PRC EIT tax rates25%25%
Tax at the PRC EIT tax rates140,04223,305
Tax effect of different tax rates of subsidiaries operating in
other jurisdictions(2,574)(4,841)
Tax effect of concessionary tax rate(79,790)(13,502)
Tax effect of tax losses and other deductible temporary
differences not recognised, net1,75412,669
Tax effect of non-deductible expenses1,1703,837
Tax effect of non-taxable income(28)(447)
Impacts on foreign exchange10309
Withholding tax in respect of profit earned from PRC subsidiaries27,1896,386
Underprovision of PRC EIT in prior year77206
87,85027,922
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 72 -
- INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d)
The following are the major deferred tax (assets) liabilities recognised and movements thereon during the current
and prior years: Distributable EnvironmentalMiningprofits of rehabilitationrights (1) InventoriesOtherssubsidiariesTotal US$’000US$’000US$’000US$’000US$’000US$’000 At January 1, 2024(10,900)107,7008,081(3,160)–101,721 Charge (credit) to profit or loss905(2,644)2,2196,1093,69010,279
At December 31, 2024(9,995)105,05610,3002,9493,690112,000 Charge (credit) to profit or loss338(3,916)2,8694,57419,80023,665
At December 31, 2025(9,657)101,14013,1697,52323,490135,665
(1)
Amount represents deferred tax liability arising from the fair value adjustment on mining rights during the business acquisition of
Skyland Mining Limited and its subsidiaries (“Skyland”) in December 2010.
For the purpose of presentation in the consolidated statement of financial position, certain deferred tax assets and
liabilities have been offset. The following is the analysis of the deferred tax balances for financial reporting purposes:
20252024
US$’000US$’000
Deferred tax assets––
Deferred tax liabilities(135,665)(112,000)
(135,665)(112,000)
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 73 -
- INCOME TAX EXPENSE/DEFERRED TAXATION (Cont’d) The Group’s unrecognised deferred income tax assets are as follows: 20252024 US$’000US$’000 Deferred income tax assets Tax losses carry forwards30,98630,493 Other deductible temporary differences1,6561,657
Total unrecognised deferred income tax assets32,64232,150
Due to the unpredictability of future profit streams, deferred tax asset of US$30,986,000 (2024: US$30,493,000)
has not been recognised in respect of unused tax losses of US$147 million (2024: US$145 million) which are mainly
generated from the Company. Under Canadian tax laws, unused tax losses can be carried forward for 20 years if the
loss arises in tax years ended after December 31, 2005. Included in unrecognised tax losses are losses of US$82
million that will expire from 2027 to 2045 (2024: US$81 million that will expire from 2027 to 2044). Other losses
may be carried forward indefinitely.
Other deductible temporary differences of US$2 million (2024: US$2 million) are primarily comprised of share issue
costs and cumulative eligible capital expenditures that were incurred by the Company which are tax deductible
according to the relevant tax law in Canada. No deferred tax asset has been recognised because the amount of
future taxable profit that will be available to realise such assets is unpredictable and not probable.
The Group is within the scope of the Pillar Two model rules. The Group will account for the Pillar Two income taxes
as current tax when incurred. Pillar Two legislation has been enacted or substantively enacted but not yet in effect
as at 31 December 2025 in certain jurisdictions, such as the PRC, in which the Group operates.
Potential exposure is assessed based on the information available regarding the financial performance of the Group
in the current year. As such, it may not be entirely representative of future circumstances. Based on the assessment,
the Group’s effective tax rates in jurisdictions in which it operates are above 15% and the directors of the Company
are not currently aware of any circumstances under which they might change. Therefore, the Group does not expect
potential exposure to Pillar Two “top-up” taxes. The Group continues to follow Pillar Two legislative developments to
evaluate the potential future impact on its financial statements.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 74 -
- PROFIT FOR THE YEAR Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Profit for the year has been arrived at after charging (crediting): Auditor’s remuneration600767
Depreciation included in cost of sales and inventories124,924114,400 Depreciation included in research and development expenses218 Depreciation included in general and administrative expenses (note 6)7,0726,867
Total depreciation of property, plant and equipment131,998121,285
Depreciation included in cost of sales and inventories4,8644,677 Depreciation included in general and administrative expenses (note 6)5499
Total depreciation of right-of-use assets4,9184,776
Amortisation of mining rights (included in cost of sales)29,08319,906
Loss on disposal of property, plant and equipment2,369620
Staff costs Directors’ and chief executive’s emoluments (note 11)310493 Staff salaries and benefits19,61016,526 Retirement benefits contributions1,4241,173
Total salaries and benefits included in administrative expenses (note 6)21,34418,192 Total salaries and benefits included in cost of sales and inventories63,47056,443 Total salaries and benefits included in research and development expenses2,8822,340
Total staff costs87,69676,975
Bank interest income(8,705)(3,114)
Dividend income from equity instrument at FVTOCI(3,026)(2,095)
Government grants(871)(363)
Allowance for credit losses of trade and other receivables, net1,4342,051 Provision for impairment of other non-current assets (note 22)5,879–
Write-down of inventories–291
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 75 -
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (a) Directors’ and chief executive’s emoluments Directors’ and chief executive’s remuneration for the year, disclosed pursuant to the applicable Listing Rules and CO, is as follows: For the year ended December 31, 2025 SalariesRetirement and otherbenefits FeesbenefitscontributionsTotal US$’000US$’000US$’000US$’000 Executive Directors and Chief Executives (Note a) Chenguang Hou–––– Executive Directors (Note b) Na Tian–––– Yuanhui Fu–10610116 Non-executive Director (Note c) Wanming Wang–––– Independent Non-executive Directors (Note d) Yingbin Ian He53–356 Wei Shao45–146 Bielin Shi46––46 Ruixia (Rane) Han46––46
19010614310
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 76 -
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (Cont’d) (a) Directors’ and chief executive’s emoluments (Cont’d) For the year ended December 31, 2024 SalariesRetirement and otherbenefits FeesbenefitscontributionsTotal US$’000US$’000US$’000US$’000 Executive Directors and Chief Executives (Note a) Junhu Tong–26329 Chenguang Hou–––– Executive Directors (Note b) Weibin Zhang–1489157 Na Tian–––– Yuanhui Fu–1009109 Non-executive Director (Note c) Wanming Wang–––– Independent Non-executive Directors (Note d) Yingbin Ian He54–357 Wei Shao46–349 Bielin Shi46––46 Ruixia (Rane) Han46––46
19227427493
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 77 -
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (Cont’d) (a) Directors’ and chief executive’s emoluments (Cont’d) Notes: (a) Mr. Chenguang Hou was appointed as executive directors and Chief Executive Officer (“CEO”) effective from November 14,
- He is employed by CNG and his emolument payments are centralised and made by CNG for the years ended December
31, 2024 and 2025. Mr. Junhu Tong resigned as executive director and CEO effective from August 2, 2024. Mr. Junhu Tong
was also employed by CNG and partial of his emolument payments were centralised and made by CNG for the year ended
December 31, 2024. (b) The executive directors’ emoluments shown above were for their services in connection with the management of the affairs
of the Company and the Group. Ms. Na Tian is employed by CNG and her emolument payments are centralised and made by CNG for the years ended
December 31, 2024 and 2025. Mr. Weibin Zhang retired as an executive director of the Company with effect from the conclusion of the annual general
meeting held on June 26, 2025 (or June 27, 2025 Hong Kong time). (c) The non-executive director’s emoluments shown above were mainly for his services as director of the Company. (d) The independent non-executive directors’ emoluments shown above were mainly for their services as directors of the Company. For the years ended December 31, 2025 and 2024, none of the directors of the Company waived or agreed to waive any emoluments. (b) Five highest paid employees The five highest paid employees included one director (2024: two directors) for the year ended December 31, - The emoluments of the four (2024: three) non-director employees for the year ended December 31,
2025, are as follows: Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Employees Salaries and other benefits463385 Retirement benefits contributions1915
482400
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 78 -
- DIRECTORS’ AND CHIEF EXECUTIVE’S EMOLUMENTS AND FIVE HIGHEST PAID EMPLOYEES (Cont’d) (b) Five highest paid employees (Cont’d) The number of the highest paid employees who are not the directors of the Company whose remuneration fell within the following band is as follows: No. of individuals 20252024 Nil to HK$1,000,000 (equivalent to approximately US$129,000)21 HK$1,000,001 to HK$1,500,000 (equivalent to approximately US$129,001 to US$193,000)22
During the years ended December 31, 2025 and 2024, no emoluments were paid by the Group to the directors
of the Company or the five highest paid individuals as an inducement to join or upon joining the Group or as
compensation for loss of office.
12. DIVIDEND
During the year ended December 31, 2024, a dividend in respect of the year ended December 31, 2024 of US$0.08
per common share (the basic dividend of US$0.05, and the special dividend of US$0.03), in an aggregate amount
of US$31,713,000 was declared and paid to the shareholders of the Company upon the approval of the board
resolution dated March 26, 2025.
Subsequent to the end of the reporting period, a dividend in respect of the year ended December 31, 2025 of
US$0.47 per common share, in an aggregate amount of US$186,785,121, has been declared by the directors of
the Company upon the approval of the board resolution dated March 30, 2026.
13. EARNINGS PER SHARE
Profit used in determining earnings per share are presented below:
Year endedYear ended
December 31,December 31,
20252024
Profit attributable to owners of the Company for the purposes of basic
earnings per share (US$’000)466,95962,732
Weighted average number of common shares, basic396,413,753396,413,753
Basic earnings per share (US cents)117.8015.82
The Group had no outstanding potential dilutive instruments issued as at December 31, 2025 and 2024 and during
the years ended December 31, 2025 and 2024. Therefore, diluted earnings per share is the same as the basic
earnings per share.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 79 -
- CASH AND CASH EQUIVALENTS/RESTRICTED BALANCES/TERM DEPOSITS
Cash and cash equivalents of the Group are comprised of cash on hand and bank balances. The Group’s cash
and cash equivalents, restricted balances and term deposits denominated in the foreign currencies other than the respective group entities’ functional currencies are presented below: December 31,December 31, 20252024 US$’000US$’000 Denominated in: Canadian dollars179129 Renminbi (“RMB”)346,538170,392 US$–3 Hong Kong dollars4,8014,227
351,518174,751
The bank balances carry interest rates ranging from 0.05% to 1.485% (2024: 0.001% to 2.95%) per annum.
Restricted balances carry interest at market rates ranging from 0.05% to 0.10% (2024: 0.35% to 1.15%) per annum.
Included in the restricted balance as at December 31, 2025 and 2024, are cash held in designated bank accounts
restricted for mine reclamation and environmental rehabilitation purposes as required by government regulations,
certain amounts represents deposits that have been frozen by the Intermediate People’s Court of Lhasa City, Tibet
(“Tibet Intermediate Court”) in relation to the litigations involved by Huatailong. Details of litigations are set out in
note 31(i).
As at December 31, 2025, term deposits carry interest at fixed market rates ranging from 1.15% to 1.7% (2024:
1.5% to 2.0%) per annum. The Group’s term deposits represent deposits held in a CNG subsidiary denominated in
RMB with original maturities over three months and redeemable on maturity.
The Group maintains deposits with China National Gold Group Finance Company Limited (“China Gold Finance”),
a subsidiary of CNG, which is a related party. China Gold Finance holds a financial institution licence and provides
financial services exclusively to subsidiaries and associates of CNG.
These deposits are unsecured, interest-bearing at rates that are considered to be comparable to prevailing market
rates, and are cashable on demand or repayable at their stated maturity. Further details are disclosed in Note 30
(a) to the consolidated financial statements.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 80 -
- TRADE AND OTHER RECEIVABLES December 31,December 31, 20252024 US$’000US$’000 Trade receivables2,1112,473 Less: allowance for credit losses(344)(180)
1,7672,293 Amounts due from related companies (note 30(a)) (1) 2,7621,583 Other receivables (2) 3,7173,517
Total trade and other receivables8,2467,393
At January 1, 2024, trade receivables from contracts with customers amounted to US$1,466,000.
(1)
The amounts are unsecured, interest free and repayable on demand.
(2)
Included in the balance as at December 31, 2025 and 2024 are Tax and Other Surcharges (as defined in note 22) with carrying
amount of nil (2024: US$1,270,000), net of allowance for credit losses, to be recovered from Zhongxinfang Tibet Construction
Investment Co. Ltd. (“Zhongxinfang”), an independent third party property developer. As detailed disclosed in Note 31(i)(c).
Based on the best available information to the Group and the credit risk assessment of Zhongxinfang as of December
31, 2025, expected credit loss of RMB9,131,000 (equivalent to US$1,270,000) (2024: RMB13,697,000 (equivalent to
US$1,923,000) for the Tax and Other Surcharge from Zhongxinfang are recognised, and the accumulated allowance
for credit losses is RMB45,655,000 (equivalent to US$6,351,000) as of December 31, 2025 (2024: RMB36,524,000
(equivalent to US$5,081,000)).
The Group allows an average credit period of 30 days and 180 days to its trade customers.
Below is an aged analysis of trade receivables (net of allowance for credit losses) presented based on invoice dates,
which approximated the respective revenue recognition dates, at the end of the reporting period:
December 31,December 31,
20252024
US$’000US$’000
Less than 30 days714819
31 to 90 days241130
91 to 180 days3276
Over 180 days8091,068
Total trade receivables1,7672,293
In determining the recoverability of a trade receivable, the Group considers any change in the credit quality of the trade receivable from the date credit was initially granted up to the reporting date. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 81 -
- PREPAID EXPENSES AND DEPOSITS December 31,December 31, 20252024 US$’000US$’000 Deposit for acquisition of land use right (Note a)–23,906 Deposit for water treatment project–6,017 Deposit paid for acquisition of property, plant and equipment (Note b)74172 Other prepayment and deposits1,7941,513
1,86831,608 Less: Amounts that will be settled or utilised within one year shown under current assets(1,794)(1,513)
Amounts that will be settled or utilised for more than one year shown under non-current assets7430,095
Notes: a. The amounts comprised cost of land use right, grassland compensation fee paid to government authorities and relocation compensation fees paid to pastoralists, which are related to the acquisition of a land use right for the Phase III tailings dam construction project in Jiama Mine. During the year, the acquisition of land used rights was completed the relevant deposits paid was transferred to right of use assets. b. The amount represents deposits paid to third party contractors for the acquisition of property, plant and equipment to expand the Group’s mining capacity in Tibet, the PRC. The amount is shown as non-current asset. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 82 -
- INVENTORIES December 31,December 31, 20252024 US$’000US$’000 Gold in process249,498222,568 Gold doré bars8,28326,467 Consumables9,71311,119 Copper concentrate5,0175,959 Spare parts22,02524,292
Total inventories294,536290,405
Inventories totalling US$620,578,000 (2024: US$464,027,000) for the year ended December 31, 2025 was recognised in cost of sales. 18. RIGHT-OF-USE ASSETS LeaseholdLeasedLeased landsequipmentpropertiesTotal US$’000US$’000US$’000US$’000 At December 31, 2025 Carrying amount103,949391179104,519 At December 31, 2024 Carrying amount45,0318992745,957 For the year ended December 31, 2025 Depreciation charge4,441420574,918 For the year ended December 31, 2024 Depreciation charge4,208469994,776
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 83 -
- RIGHT-OF-USE ASSETS (Cont’d) Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Total cash outflow for leases (Note)21,16135,722
Additions to right-of-use assets63,15411,217
For both years, the Group leases leasehold lands, equipment and office premises for its operations. The lease terms
of leasehold lands are 2 years to in perpetuity (2024: 2 years to in perpetuity). Lease contracts of office premises and
equipment are entered into for a fixed term of 5 years (2024: 5 years). Lease terms are negotiated on an individual
basis and contain a wide range of different terms and conditions. In determining the lease term and assessing the
length of the non-cancellable period, the Group applies the definition of a contract and determines the period for
which the contract is enforceable.
The Group obtained several land use right certificates for leasehold lands where its mining facilities are primarily
located. Lump sum payments were made upfront to acquire these leasehold lands. The leasehold lands are presented
separately.
Note: The amount that the Group paid to government authorities and pastoralists of during the year ended 31 December 2024 of
US$23,906,000 as a deposit for acquisition of land use right is included in the total cash outflow for leases for the year ended 31
December 2024.
The Group depreciated the leasehold lands using the straight-line method over the estimated useful lives of the
leasehold land.
Restrictions or covenants on leases
In addition, lease liabilities of US$12,584,000 (2024: US$928,000) are recognised with related right-of-use assets of
US$13,458,000 (2024: US$926,000) as at December 31, 2025. The lease agreements do not impose any covenants
other than the security interests in the leased assets that are held by the lessor. Leased assets may not be used as
security for borrowing purposes.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 84 -
- EQUITY INSTRUMENTS AT FVTOCI December 31,December 31, 20252024 US$’000US$’000 Listed investments: Equity securities listed in Hong Kong (Note a)133,67847,599 Unlisted investments: Equity securities (Note b)197812
Total133,87548,411
Note:
a. The above investments represent 2.03% equity interest in ordinary shares of China Nonferrous Mining Corporation Limited (“CNMC”),
an entity listed in Hong Kong and is principally engaged in mining, processing and trading of nonferrous metals in Zambia. These
investments are not held for trading, instead, they are held for long-term strategic purposes. The directors of the Company have
elected to designate these investments in equity instruments as at FVTOCI as they believe that recognising short-term fluctuations
in these investments’ fair value in profit or loss would not be consistent with the Group’s strategy of holding these investments for
long-term purposes and realising their performance potential in the long run.
During the year ended December 31, 2025, a fair value gain of US$86,079,000 (2024: US$1,271,000) was recognised in other
comprehensive income and accumulated under the heading of investments revaluation reserve in accordance with the Group’s
accounting policies.
b. The above unlisted equity investments represent 7.425% (2024: 7.425%) share interest in Tibet Zhongjin Xinlian Demolition Engineering
Co. Ltd. (“Tibet Zhongjin Xinlian”) and 4% share interest in Tibet Electric Power Trading Center Co., Ltd. (“Tibet Electric”). Tibet
Zhongjin Xinlian is established in the PRC and principally engaged in the development and manufacturing of explosives. Tibet Electric
is established in the PRC and is principally engaged in the trading of electric power in the PRC. The directors of the Company have
elected to designate these investments in equity instruments as at FVTOCI as they believe that recognising short-term fluctuations
in these investments’ fair value in profit or loss would not be consistent with the Group’s strategy of holding these investments for
long-term purposes and realising their performance potential in the long run.
During the year, a fair value loss of unlisted investments of USD615,000 (2024: Nil) was recognised in other comprehensive income
and accumulated under the heading of investments revaluation reserve in accordance with the Group’s accounting policies. As
at December 31, 2025, the fair value of the unlisted equity investments are RMB1,385,000 (approximately US$197,000) (2024:
RMB5,838,000 (approximately US$812,000)),
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 85 -
- PROPERTY, PLANT AND EQUIPMENT FurnitureMachineryConstruction and officeandMotorLeaseholdMineralin progress BuildingsCrushersequipmentequipmentvehiclesimprovementsassets(“CIP”)Total US$’000US$’000US$’000US$’000US$’000US$’000US$’000US$’000US$’000 COST At January 1, 2024516,370227,33215,582311,73811,728981,419,318125,7112,627,877 Additions1,502–2,6775,0108–14,04811,09334,338 Transfer from CIP115,345–––––31(115,376)– Environmental rehabilitation adjustment (note 28)––––––(9)–(9) Disposals(997)–(37)(2,336)––––(3,370) Exchange realignment(8,257)–(195)(3,787)(123)–(12,787)(878)(26,027)
At December 31, 2024623,963227,33218,027310,62511,613981,420,60120,5502,632,809 Additions1,791–3,7855,6081,790–8,69629,05950,729 Transfer from CIP10,169–113––––(10,282)– Environmental rehabilitation adjustment (note 28)––––––20,249–20,249 Disposals––(142)(21)(550)–(2,098)–(2,811) Exchange realignment13,727–3655,868208–18,67070139,539
At December 31, 2025649,650227,33222,148322,08013,061981,466,11840,0282,740,515
ACCUMULATED DEPRECIATION At January 1, 2024(173,213)(187,449)(9,562)(186,509)(7,688)(98)(581,457)–(1,145,976) Provided for the year(30,023)(14,054)(1,653)(18,044)(862)–(56,649)–(121,285) Eliminated on disposals545–32,202––––2,750 Exchange realignment2,509–1132,17081–2,327–7,200
At December 31, 2024(200,182)(201,503)(11,099)(200,181)(8,469)(98)(635,779)–(1,257,311) Provided for the year(44,404)(658)(3,626)(16,959)(1,930)–(64,421)–(131,998) Eliminated on disposals––169405–––430 Exchange realignment(4,775)–(237)(3,676)(156)–(3,345)–(12,189)
At December 31, 2025(249,361)(202,161)(14,946)(220,807)(10,150)(98)(703,545)–(1,401,068
CARRYING VALUE At December 31, 2025400,28925,1717,202101,2732,911–762,57340,0281,339,447
At December 31, 2024423,78125,8296,928110,4443,144–784,82220,5501,375,498
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 86 -
- PROPERTY, PLANT AND EQUIPMENT (Cont’d)
Except for mineral assets and construction in progress, the above items of property, plant and equipment, taking
into account the residual value, are depreciated using the straight-line method over the estimated useful lives of the related assets as follows: BuildingsOver the shorter of the term of lease, or 24 years Crushers10 to 14 years Furniture and office equipment2 to 5 years Machinery and equipment2 to 10 years Motor vehicles5 to 10 years Leasehold improvementsOver the shorter of the term of lease, or 5.5 years Mineral assets mainly represent drilling, stripping and related costs incurred on sites with an existing mine and
on areas within the boundary of a known mineral deposit which contains proven and probable reserves and are
capitalised when they are incurred to improve access to the future ores. Mineral assets are depreciated using the
unit-of-production method based on the actual production volume over the estimated total proven and probable
reserves of the mines. Mineral Assets (a) CSH Gold Mine CSH Gold Mine, in which the Group holds a 96.5% equity interest, consists of a licensed area in the western part of Inner Mongolia, northern China. The site is centrally positioned within the east-west-trending Tian
Shan Gold Belt. The carrying value of the CSH Gold Mine in relation to mineral assets is US$80,734,000 as
at December 31, 2025 (2024: US$110,040,000). (b) Jiama Mine The Jiama Mine, a large copper-gold polymetallic deposit consisting of skarn-type and hornfels-type mineralization located in Metrorkongka County in Tibet, in which the Group holds 100% equity interest through its wholly- owned subsidiary, Skyland. The Group acquired Skyland on December 1, 2010. The carrying value of the Jiama Mine in relation to mineral assets is US$681,839,000 as at December 31, 2025 (2024: US$674,782,000). NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 87 -
- INTANGIBLE ASSETS PatentsMining rightsTotal US$’000US$’000US$’000 COST At January 1, 2024–1,009,9251,009,925 Exchange realignment–(1,018)(1,018)
At December 31, 2024–1,008,9071,008,907 Additions150–150 Exchange realignment21,5481,550
At December 31, 20251521,010,4551,010,607
ACCUMULATED AMORTISATION At January 1, 2024–(236,808)(236,808) Provided for the year–(19,906)(19,906) Exchange realignment–221221
At December 31, 2024–(256,493)(256,493) Provided for the year–(29,083)(29,083) Exchange realignment–(384)(384)
At December 31, 2025–(285,960)(285,960)
CARRYING VALUE At December 31, 2025152724,495724,647
At December 31, 2024–752,414752,414
Note:
The amounts represent two mining rights in the Jiama Mine and CSH Gold Mine. Mining rights in the Jiama Mine are in relation to the
copper and other by-products production, acquired through the acquisition of Skyland. The mining right of Jiama Mine was renewed in
October 2023 and will expire in October 2043. The mining permit of CSH Gold Mine was renewed in May 2025 for a period of 20 years
and will expire in May 2045.
Amortisation on mining rights acquired is provided to write off the cost of the mining rights using the unit-of-production method based on
the actual production volume over the estimated total proven and probable reserves of the mines.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 88 -
- OTHER NON-CURRENT ASSETS
During the year ended December 31, 2019, the Group entered into a cooperation agreement (the “Cooperation
Agreement”) with Zhongxinfang in relation to the development of a composite project in Lhasa, Tibet, China. Pursuant to the Cooperation Agreement, the Group agreed to transfer the land use right for the development and Zhongxinfang agreed to compensate the Group by transferring a block of the buildings and twenty car parks (the “New Premises”) within two years from the date of the Cooperation Agreement (the “Land Exchange”) and reimbursing all related tax exposures including but not limited to land appreciation tax, EIT and other surcharge related to the Land Exchange (the “Tax and Other Surcharge”). During the year ended December 31, 2019, the land use right was transferred
to Zhongxinfang. Accordingly, the Group derecognised the right-of-use assets and recognised the right to receive
the New Premises, which approximates the fair value of the New Premises at the date of transfer and the other
receivables relating to the tax reimbursement from Zhongxinfang. The right to receive the New Premises was initially recognised at its fair value and subsequently carried at cost less impairment. Based on the Cooperation Agreement, Zhongxinfang is obligated to deliver the New Premises to the Group no later than May 31, 2021. As at December 31, 2025 and up to the date these consolidated financial statements are authorised for issue,
the composite project is still suspended due to litigations against Zhongxinfang and the New Premises are still not delivered to Huatailong. Further details are disclosed in Note 31(i)(b). Based on Group’s assessment on the status of the New Premises and taking into account the valuation of the New Premises by using sales comparison method under market approach as its fair value less cost of disposal, impairment loss of RMB41,995,000 (equivalent to US$5,879,000) (2024: nil) has been made during the year ended December 31, 2025 and the carrying amount of the other non-current assets are RMB69,929,000 (equivalent to US$9,949,000) as at December 31, 2025 (2024: RMB111,924,000 (equivalent to US$15,570,000)). - ACCOUNTS AND OTHER PAYABLES AND ACCRUED EXPENSES
Accounts and other payables of the Group are principally comprised of amounts outstanding for trade purchases
relating to minerals production activities and construction activities. The average credit period taken for trade
purchases is between 120 to 150 days. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 89 -
- ACCOUNTS AND OTHER PAYABLES AND ACCRUED EXPENSES (Cont’d) Accounts and other payables and accrued expenses comprise the following: December 31,December 31, 20252024 US$’000US$’000 Accounts payable36,02125,811 Construction costs payable91,18184,218 Mining loyalties payable (Note a)50,57749,057 Payable for litigation compensation (note 31)–23,872 Payable for acquisition of a mining right1,2012,349 Payroll and benefit payable2,085286 Mining cost accrual1,5441,544 Other accruals2,4722,231 Other tax payables13,0069,719 Other payables9,1608,867
Total accounts and other payables and accrued expenses207,247207,954
Current181,828175,132 Non-current (Note a)25,41932,822
207,247207,954
Note:
a. As stipulated in an agreement with local authorities and relevant government notices. Since 2017, the Group is required to pay
royalties to the PRC government for the use of state-owned natural resources in relation to the Jiama Mine, calculated based on
invoiced revenue and ore yield. The royalties payable for 2017 to May 2023 was allowed to be settled with six fixed annual instalments
of RMB61.3 million each, totalling RMB368 million with first instalment payable from 2024 and final instalment due in 2029. The
royalties from May 2023 onwards are payable annually.
As at December 31, 2025, the mining royalties payable consist of (i) RMB235,936,000 (equivalent to US$33,567,000) (2024:
RMB292,102,000 (equivalent to US$40,635,000)) being present value of remaining four (2024: five) annual instalments and (ii)
RMB119,562,000 (equivalent to US$17,010,000) (2024: RMB60,542,000 (equivalent to US$8,422,000)) being royalties payable
based on invoiced revenue and ore yield during the year.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 90 -
- ACCOUNTS AND OTHER PAYABLES AND ACCRUED EXPENSES (Cont’d)
The following is an aging analysis of the accounts payable presented based on the invoice date at the end of the
reporting period: December 31,December 31, 20252024 US$’000US$’000 Less than 30 days20,77911,094 31 to 90 days4,5615,330 91 to 180 days1,5933,298 Over 180 days9,0886,089
Total accounts payable36,02125,811
- CONTRACT LIABILITIES December 31,December 31, 20252024 US$’000US$’000 Sales of copper concentrate10,0638,099
At January 1, 2024, contract liabilities amounted to US$71,000. The following table shows how much of the revenue recognised relates to carried-forward contract liabilities. Copper concentrate December 31,December 31, 20252024 US$’000US$’000 Revenue recognised that was included in the contract liability balance at the beginning of the year8,09971
Typical payment terms which have an impact on the amount of contract liabilities recognised are as follows: When the Group receives a deposit before the goods are delivered, this will give rise to contract liabilities at the start of a contract, until the revenue recognised on the relevant contract exceeds the amount of the deposit. The Group typically receives 100% deposit on acceptance of sales orders for copper concentrate including other by-products. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 91 -
- BORROWINGS December 31,December 31, 20252024 US$’000US$’000 Bank loans422,467633,666 Loans payable to a CNG’s subsidiary (note 30)82,51880,686
504,985714,352
The borrowings are repayable as follows: December 31,December 31, 20252024 US$’000US$’000 Carrying amount repayable within one year217,004148,696 Carrying amount repayable within one to two years107,415254,855 Carrying amount repayable within two to five years111,756212,914 Carrying amount repayable over five years68,81097,887
504,985714,352 Less: Amounts due within one year (shown under current liabilities)(217,004)(148,696)
Amounts shown under non-current liabilities287,981565,656
Included in the carrying amounts of borrowings as above, except for loans payables to a CNG’s subsidiary, all
remaining borrowings are bank loans.
The loans payables to a CNG’s subsidiary amounted to US$56,909,000 (2024: Nil) are repayable within one year,
US$25,609,000 (2024: US$55,646,000) are repayable within one to two years and Nil (2024: US$25,040,000) are
repayable within two to five years as at December 31, 2025.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 92 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 93 -
- BORROWINGS (Cont’d) Analysed as: December 31,December 31, Notes20252024 US$’000US$’000 Secured syndicated loan(1)197,119245,605 Unsecured syndicated loan (Note a)(2)117,182118,754 Unsecured syndicated loan(3)7,114– Unsecured bank loan(4)–39,647 Unsecured bank loans(5)–88,059 Unsecured bank loan(6)12,80413,216 Unsecured bank loan(7)–38,952 Unsecured bank loan(8)9,24810,433 Unsecured bank loan(9)15,00015,000 Unsecured bank loan(10)20,00020,000 Unsecured bank loan(11)44,00044,000 Unsecured loans payable to a CNG’s subsidiary(12)56,90955,646 Unsecured loans payable to a CNG’s subsidiary(13)25,60925,040
504,985714,352
- BORROWINGS (Cont’d)
Notes:
(1)
Repayable by instalment and will reach full maturity in November 2028. The loan carries a floating interest rate, currently set at
1.50% (2024: 1.95%) per annum, based on the People’s Bank of China National Interbank Funding Center Loan Prime Rate (“LPR”) benchmark. The carrying values of the pledged assets to secure above borrowing by the Group are as follows: December 31,December 31, 20252024 US$’000US$’000 Mining rights723,579750,627
(2)
Repayable by instalment and will reach full maturity in April 2033. The loan carries a floating interest rate, currently set at 1.95%
(2024: 1.95%) per annum, based on the LPR benchmark.
(3)
Repayable by instalment and will reach full maturity in June 2030. The loan carries a floating interest rate, currently set at 1.50%
per annum, based on the LPR benchmark.
(4)
Repayable by instalment and will reach full maturity in May 2026. The loan carries a floating interest rate, currently set at 1.85%
(2024: 1.85%) per annum, based on the LPR benchmark. The Group early repaid the loan prior to maturity during the year.
(5)
Repayable by instalment and will reach full maturity in June 2026. These loans carry a floating interest rate, currently set at a range
from 1.85% to 1.95% (2024: from 1.35% to 1.60%) per annum, based on the LPR benchmark. The Group early repaid the loan
prior to maturity during the year.
(6)
Repayable by instalment and will reach full maturity in November 2026. The loan carries a floating interest rate, currently set at
1.85% (2024: 1.35%) per annum, based on the LPR benchmark.
(7)
Repayable by instalment and will reach full maturity in January 2027. The loan carries a floating interest rate, currently set at 1.85%
(2024: 1.60%) per annum, based on the LPR benchmark. The Group early repaid the loan prior to maturity during the year.
(8)
Repayable by instalment and will reach full maturity in May 2027. The loan carries a floating interest rate, currently set at 1.85%
(2024: 1.60%) per annum, based on the LPR benchmark.
(9)
Repayable in full in May 2026. The loan carried a floating interest rate, currently set at 4.24% per annum (2024: 5.35%), based on
the Secured Overnight Financing Rate (“SOFR”) benchmark during the year December 31, 2025.
(10)
Repayable in full in May 2026. The loan carried a floating interest rate, currently set at 4.36% per annum (2024: 5.33%), based on
the SOFR benchmark during the year December 31, 2025.
(11)
Repayable in full in May 2026. The loan carried a floating interest rate, currently set at 4.36% per annum (2024: 5.35%), based on
the SOFR benchmark during the year December 31, 2025.
(12)
Repayable in full in May 2026, carried fixed interest rate at 2.05% (2024: 2.05%) per annum.
(13)
Repayable in full in August 2027, carried fixed interest rate at 2.45% (2024: 2.05%) per annum.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 94 -
- BORROWINGS (Cont’d) In respect of bank loans with carrying amount of US$ 343,467,000 as at December 31, 2025 (2024: US$298,742,000), the Group is required to comply with certain significant financial covenants throughout the continuance of the relevant bank loans and/or as long as the bank loans are outstanding. These covenants include, but are not limited to, the following: the ratio of liabilities to assets of the borrower must not be more than certain percentage and the ratio of current asset to current liabilities of the borrower must be more than 0.5, among others. Fixed rate loans amounting to approximately US$82,518,000 (2024: US$80,686,000), carry weighted average effective interest rate of 2.17% (2024: 2.14%) per annum.
- ENTRUSTED LOAN PAYABLE
On December 25, 2023, the Group entered into a three-year entrusted loan agreement with CNG (note 30) and China
Gold Finance, in which CNG provided a loan of RMB200 million (equivalent to approximately US$28,454,000 as
at December 31, 2025 (2024: US$27,823,000)) to the Group through China Gold Finance as the entrusted bank. The entrusted loan is unsecured and carries interest at a fixed rate of 2.45% per annum. The principal amount is to be repaid on December 26, 2026. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 95 -
- LEASE LIABILITIES Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Lease liabilities payable: Within one year1,417469 Within a period of more than one year but not more than two years885459 Within a period of more than two years but not more than five years2,280– Within a period of more than five years9,463–
14,045928
Less: Amount due for settlement within 12 months shown under
current liabilities(1,417)(469)
Amount due for settlement after 12 months shown under
non-current liabilities12,628459
The weighted average incremental borrowing rate applied to lease liabilities range is 6.39% (2024: 4.67%).
28. ENVIRONMENTAL REHABILITATION
The environmental rehabilitation relates to reclamation and closure costs relating to the Group’s mine operations
at the CSH Gold Mine and Jiama Mine. The environmental rehabilitation is calculated as the net present value of
estimated future net cash flows of the reclamation and closure costs of US$112,169,000 (2024: US$104,729,000),
discounted at 2.4% (2024: 5.7%) per annum at December 31, 2025.
The following is an analysis of the environmental rehabilitation:
20252024
US$’000US$’000
At January 169,94875,924
Additions to site reclamation (note 18)20–
Adjustments and additions to site reclamation resulted from changes in
disturbance areas and discount rates (note 20) 20,249(9)
Accretion incurred in the current year2,7472,811
Payment during the year(692)(7,841)
Exchange realignment1,506(937)
At December 3193,77869,948
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 96 -
-
SHARE CAPITAL Common shares (i) Authorised – Unlimited common shares without par value (ii) Issued and outstanding Number of sharesAmount US$’000 Issued & fully paid: At January 1, 2024, December 31, 2024 and 2025396,413,7531,229,061
-
RELATED PARTY TRANSACTIONS Related parties are those parties that have the ability to control the other party or exercise significant influence in making financial and operation decisions. Parties are also considered to be related if they are subject to common control.
CNG, a state owned company registered in Beijing, PRC, which is controlled by State-owned Assets Supervision and Administration Commission of the State Council of the PRC, is able to exercise significant influence over the Company. The management believes that information relating to related party transactions have been adequately disclosed in accordance with the requirements of IAS 24 Related party Disclosures. In addition to the related party transactions and balances shown elsewhere in these consolidated financial statements, the following is a summary of significant related party transactions entered into in the ordinary course of business
between the Group and its related parties for the years ended December 31, 2025 and 2024 and related party
balances as at December 31, 2025 and 2024. Name and relationship with related parties during the years are as follows: CNG owned the following percentages of outstanding common shares of the Company: December 31,December 31, 20252024 CNG40.0140.01
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 97 -
- RELATED PARTY TRANSACTIONS (Cont’d) (a) Transactions/balances with CNG and its subsidiaries The Group had the following transactions with CNG and CNG’s subsidiaries: December 31,December 31, 20252024 US$’000US$’000 Gold doré bars sales by the Group (Note a)338,473246,946
Copper and other by-product sales by the Group (Note b)964,772505,068
Other income–710
Provision of transportation services by the Group (Note b)2,3041,161
Construction, stripping and mining services provided to
the Group (Note b)139,13991,281
Accrued expenses for short-term property
management fee (Note b)455456
Commitment fee597622
Interest income4,7282,492
Interest expense on borrowings and entrusted loan payable2,4852,498
Interest expense on lease liabilities (Note b)4161
Loans (note 25) provided to the Group during the year–25,275
Notes:
a. On May 7, 2014, the Company’s subsidiary, IMP entered into an exclusive contract for the sale of doré with CNG pursuant
to which IMP sells gold doré bars to CNG for the period up to December 31, 2017. On May 26, 2017, IMP and CNG entered
into the Supplemental Contract for Purchase and Sale of Dore for an extended term commencing on January 1, 2018 and
expiring on December 31, 2020. On May 6, 2020, the IMP and CNG entered into the third Supplemental Contract for Purchase
and Sale of Dore for an extended term commencing on January 1, 2021 and expiring on December 31, 2023. On May 11,
2023, the IMP and CNG entered into the fourth Supplemental Contract for Purchase and Sale of Dore for an extended term
commencing on January 1, 2024 and expiring on December 31, 2026.
The extent of the continuing connected transactions for the years ended December 31, 2025 and 2024 did not exceed the
limit as set out in the announcements of the Company on May 11, 2023.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 98 -
- RELATED PARTY TRANSACTIONS (Cont’d)
(a) Transactions/balances with CNG and its subsidiaries (Cont’d)
b. On April 26, 2013, the Company entered into a product and service framework agreement with CNG for the provision of mining
related services and products to the Company for three years until June 18, 2016. The agreement was amended to extend
the term of the agreement to December 31, 2017 and to include copper concentrates sales contract and office lease contract with CNG since May 29, 2015. On May 26, 2017, the Company and CNG entered into the second supplemental product and service framework agreement to extend the term to December 31, 2020 and to extend the scope of the supplemental product and service framework agreement to include leasing services to be provided by Zhongxin International Financial Leasing
(Shenzhen) Co. Ltd., the shares of which are 80% owned by CNG. On May 6, 2020, the Company and CNG entered into the third supplemental product and service framework agreement to extend the term to December 31, 2023. On May 11, 2023, the Company and IMP entered into the fourth supplemental product and service framework agreement for an extended term commencing on January 1, 2024 and expiring on December 31, 2026. The extent of the continuing connected transactions for the years ended December 31, 2025 and 2024 did not exceed the limit as set out in the announcements of the Company on May 11, 2023. c. On December 18, 2017, the Company and China Gold Finance entered into a deposit services agreement (“Deposit Services Agreement”) pursuant to which the Company and its subsidiaries may, from time to time, make withdrawals and deposits with China Gold Finance commencing from January 1, 2018 for one year. On December 18, 2018, the Deposit Services Agreement has been extended for a one year term to December 31, 2019
pursuant to the supplemental deposit services agreement. On December 31, 2019, the Deposit Services Agreement have been extended for a one year term to December 31, 2020
pursuant to the supplemental deposit services agreement, all other terms and conditions remain the same. On December 22, 2020, the Company and China Gold Finance entered into a second Deposit Services Agreement to extend for one year term to December 31, 2021 with all other terms and conditions remaining the same. The second Deposit Services Agreement was expired with the effective of the third Deposit Services Agreement on June 30, 2021 as described below. On May 5, 2021, the Company and China Gold Finance entered into a third Deposit Services Agreement pursuant to which the Company and its subsidiaries may, from time to time, make withdrawals and deposits with China Gold Finance up to a
daily maximum deposit balance (including interest) not exceeding RMB3,000 million (approximately equivalent to US$465
million) and extend for three years term to December 31, 2023 with all other terms and conditions remaining the same and the third Deposit Services Agreement was effective on June 30, 2021. On May 8, 2024, the Company and China Gold Finance entered into the 2024 Financial Services Agreement pursuant to which the Company and its subsidiaries may, from time to time, make withdrawals and deposits with China Gold Finance up to a
daily maximum deposit balance (including interest) not exceeding (i) RMB2,600 million (approximately equivalent to US$365 million) for the year ended December 31, 2024; (ii) RMB3,000 million (approximately equivalent to US$421 million) for the year ended December 31, 2025; (iii) RMB3,400 million (approximately equivalent to US$477 million) for the year ending
December 31, 2026. The extend of the connected transaction for deposit services during the years ended December 31, 2025 and 2024 do not exceed the limit as set out in the announcement of the Company on May 8, 2024. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 99 -
- RELATED PARTY TRANSACTIONS (Cont’d) (a) Transactions/balances with CNG and its subsidiaries (Cont’d) The Group has the following significant balances with CNG and its subsidiaries at the end of each reporting period: December 31,December 31, 20252024 US$’000US$’000 Assets Amounts due from related companies (note 15)2,7621,583 Cash and cash equivalents held in a CNG’s subsidiary (Note c)179,182150,315 Term deposits held in a CNG’s subsidiary (Note c)206,294118,246 Restricted balance held in a CNG’s subsidiary (Note c)–66,698
Total amounts due from CNG and its subsidiaries388,238336,842
Other than the cash and cash equivalents, term deposits and restricted balance held in a CNG’s subsidiary, the remaining amounts due from CNG and its subsidiaries as at December 31, 2025 and 2024, which are included in trade and other receivables are non-interest bearing, unsecured and repayable on demand. December 31,December 31, 20252024 US$’000US$’000 Liabilities Entrusted loan payable (note 26)28,45427,823 Loans payable to a CNG’s subsidiary (note 25)82,51880,686 Construction costs payable to CNG’s subsidiaries12,20719,515 Trade payable to CNG’s subsidiaries2,246952 Amount due to CNG1,7864,080 Contract liabilities with a CNG’s subsidiary10,0258,085 Lease liabilities to a CNG’s subsidiary469897
Total amounts due to CNG and its subsidiaries137,705142,038
Trade payable, construction costs payable and contract liabilities to CNG’s subsidiaries are in trade nature,
non-interest bearing and unsecured.
Amount due to CNG included in other payables is non-trade in nature, non-interest bearing, unsecured and
has no fixed term of repayment.
Entrusted loan payable, loans payable and lease liabilities to CNG and its subsidiaries are non-trade in nature,
interest-bearing, unsecured and have fixed term of repayment as detailed in respective notes.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 100 -
- RELATED PARTY TRANSACTIONS (Cont’d)
(b) Compensation of key management personnel
Other than the directors’ emoluments disclosed in note 11(a), the Group has the following compensation to
other key management personnel during the years: Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 Salaries and other benefits364237 Post-employment benefits2218
386255
- CONTINGENCIES
(i) Litigation with Huaxin and Zhongxinfang
During the year ended December 31, 2020, there was a construction contract dispute between independent
third parties including the constructor, Huaxin Construction Group Co., Ltd. (formerly named as “Nantong
Huaxin Construction Group Co., Ltd.”) (“Huaxin”), Zhongxinfang, and the Group’s subsidiary, Huatailong
(the “Construction Contract”). The land use right of a composite project under the Construction Contract was transferred from Huatailong to Zhongxinfang in 2019 pursuant to the Cooperation Agreement in relation to the Land Exchange (as defined in note 22). (a) Litigations with Huaxin and Zhongxinfang for the construction costs Since 2020, there were legal proceedings on the Construction Contract between Huaxin, Zhongxinfang
and Huatailong of which details were disclosed in the Group’s annual financial statements for the year
ended 31 December 2024. Pursuant to the final instance adjudication dated June 5, 2023 (the “June 2023 Huaxin Final Instance Adjudication”), it is affirmed that Zhongxinfang and Huatailong shall have the joint obligation for the
construction costs. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 101 -
- CONTINGENCIES (Cont’d)
(i) Litigation with Huaxin and Zhongxinfang (Cont’d)
(a) Litigations with Huaxin and Zhongxinfang for the construction costs (Cont’d)
During the year, Huatailong has paid to the Lhasa Intermediate Court the full compensation amount of
RMB178 million (equivalent to US$24,869,000) for the settlement of accumulated litigation compensation and additional interest recognised during the period, of which RMB35 million (equivalent to US$4,870,000) was paid to Huaxin as partial settlement and the remaining RMB143 million has been frozen by the Lhasa Intermediate Court pending for the resolution of a separate countersuit by Huatailong against Zhongxinfang as further detail in note 31(i)(b) below. Consequently, the Lhasa Intermediate Court has lifted and discharged the enforcement measures on
certain bank balances, non-current assets, leasehold lands, equity instruments, building and 51% equity interest in Jiama Industry and Trade, a subsidiary of the Company. On September 16, 2025, subsequent to the full settlement payment mentioned above, Huatailong received a civil ruling from the People’s Court of Duilongdeqing District, Lhasa, which ordered the freezing of
certain bank accounts of Huatailong with a total value of approximately RMB59.6 million (equivalent to approximately US$8,320,000). This freezing is a pre-litigation asset preservation measure initiated by
Huaxin in connection with in connection with a potential lawsuit to be filed by Huaxin on claiming the
remaining unpaid contract balance of the Construction Contract of approximately RMB52.0 million and accrued interest, which Huaxin is now pursuing against Huatailong after being unable to recover it from the insolvent co-obligor, Zhongxinfang. The freezing period is one year, from August 29, 2025 to August 28, 2026. As of the end of the reporting period, the actual aggregated amounts frozen were approximately RMB34.0 million (equivalent to US$4,832,000). The freezing has not materially impacted Huatailong’s normal
operations due to sufficient liquidity in other accounts. No outstanding litigation compensation payable
exists in relation to litigation with Huaxin as of December 31, 2025. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 102 -
- CONTINGENCIES (Cont’d)
(i) Litigation with Huaxin and Zhongxinfang (Cont’d)
(b) Litigations with Zhongxinfang for the delivery of New Premises and recovery of Tax and Other Surcharge
related to the land exchange whereby the Group agreed to transfer the land use right for the development of a composite project and Zhongxinfang agreed to compensate the Group by the New Premises During the year ended December 31, 2020, Huatailong filed a lawsuit against Zhongxinfang for the recovery of the construction costs of RMB149 million (equivalents to US$21,319,000) that shall be jointly borne by Huatailong. After the first instance adjudication and appeals by Zhongxinfang, on June 20, 2023, Tibet High Court adjudicated that the September 2020 Adjudication sustained (the “June 2023 Zhongxinfang Final Instance Adjudication”) and Zhongxinfang should pay relevant compensation to Huatailong within 15 days from the effective date of the June 2023 Zhongxinfang Final Instance Adjudication. On 15
September 2023, Huatailong applied for an enforcement of the June 2023 Zhongxinfang Final Instance Adjudication (the “September 2023 Enforcement”) and as at December 31, 2025 and up to the date
of these consolidated financial statements are authorised for issue, Zhongxinfang has not yet paid the
compensation to Huatailong and the September 2023 Enforcement is not executed mainly because
Zhongxinfang is involved in several litigations and there are no executable properties. (c) Litigations with Zhongxinfang for the delivery of New Premises and recovery of Tax and Other Surcharge During 2020 and 2021, Huatailong proceeded lawsuits against Zhongxinfang concerning (i) the delivery of certain premises (the “New Premises”) and a penalty, and (ii) the recovery of Tax and Other Surcharges paid by Huatailong amounting to RMB46 million (equivalent to USD6.4 million), respectively. Pre-litigation asset preservation measures are in place with (i) the New Premises comprising a block of buildings
and twenty car parks from Zhongxinfang were frozen and (ii) the value of certain properties limited to
RMB46 million (equivalent to US$6,609,000) from Zhongxinfang was frozen (collectively the “Pre-litigation Preservations”). As at December 31, 2025, the Pre-litigation Preservations were extended to May 2027. Based on the adjudication issued in relation to the lawsuit against Zhongxinfang, Zhongxinfang shall repay the Tax and Other Surcharge to Huatailong. As Zhongxinfang has not settled such amount within the due date, Huatailong applied for an enforcement of the November 2020 Adjudication in January 2021 (the
“2021 Enforcement”). However, on June 24, 2021, the Tibet Intermediate Court adjudicated the 2021
Enforcement be suspended as all of the assets owned by Zhongxinfang have been sealed up or frozen and there are no executable properties from Zhongxinfang. As at December 31, 2025 and up to the date these consolidated financial statements are authorised for issue, the New Premises are still not delivered to Huatailong. In the opinion of directors, (i) the 2021
Enforcement is currently suspended and the Group’s first priority of claim over one of the assets under Pre-litigation Preservations has been extended to May 2027, (ii) the enforcement of the adjudication that Zhongxinfang should pay penalty of RMB9 million to Huatailong that was applied by Huatailong in March 2023 is currently under proceeding and the result is not ascertained as at the date these consolidated
financial statements are authorised for issue. Further background on these matters is disclosed in the
Group’s annual financial statements for the year ended December 31, 2024. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 103 -
- CONTINGENCIES (Cont’d)
(ii) Litigation with an independent supplier of Huatailong
In May 2023, a supplier of Huatailong (the “Supplier”) proceeded a lawsuit against Huatailong for the loss
of work stoppage and slowdown resulting from the suspension of Jiama Mine’s south pit (the “Supplier Work Stoppage Loss”) which are required to be remediated by local government from June 19, 2021, for a claim
of RMB479 million (equivalent to US$66,698,000), and applied for pre-litigation preservation of assets from
Huatailong for one year. On May 24, 2023, the Tibet Intermediate Court adjudicated balance with same amount as aforementioned
placed in China Gold Finance by the Group to be frozen for one year, which was further extended up to 2026. As disclosed in the Group’s annual financial statements for the year ended December 31, 2024, and condensed consolidated financial statements for the 9 months ended September 30, 2025, there were several appeals
and retrial since the litigation of the legal proceedings in May 2023. The case was appealed to the Tibet High Court on June 10, 2025. On September 29, 2025, the Tibet High Court has issued a final judgment that Huatailong shall pay the
Supplier Work Stoppage Loss of RMB108 million (equivalent to US$15,058,000) to that independent supplier. The Group paid the judgment amount in full during the year ended December 31, 2025, and this litigation
is now concluded. Following the conclusion of the litigation in 2025, the relevant assets were released from
preservation on December 4, 2025. (iii) Litigation with Zhejiang Huaye Mining Construction Group Co., Ltd. (“Huaye”) During the year, Huaye, a mine construction contractor of the Group, filed a lawsuit against Huatailong, and another party which is a fellow subsidiary of the Company. The aggregate claims over Huatailong are approximately RMB127 million (equivalent to US$17.9 million), primarily for payments related to acquisitions of assets and payments for construction works on one of the Group’s mine in Tibet. As of December 31, 2025, the lawsuit is still in progress. With reference to legal opinion obtained, the Directors are of the view that outflow of economic benefitsis not probable as at the reporting date. Therefore, no provision has been recognised in the consolidated financial statements for the year ended December 31, 2025. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 104 -
- CAPITAL RISK MANAGEMENT
The Group’s objectives when managing capital are to safeguard the Group’s ability to continue as a going concern
in order to operate its mines, pursue the development of its mineral properties and to maintain a flexible capital
structure which optimizes the costs of capital at an acceptable risk. The Group’s overall strategy remains unchanged from prior years. The capital structure of the Group consists of net debt, which includes the borrowings, entrusted loan payable and lease liabilities disclosed in notes 25, 26 and 27 respectively, net of cash and cash equivalents, restricted balances and equity attributable to owners of the Company, comprising issued share capital, retained profits and other reserves. The Group manages the capital structure and makes adjustments to it in light of operating results, changes in
economic conditions and the risk characteristics of the underlying assets. To maintain or adjust the capital structure, the Group may attempt to issue new shares, issue new debt, repayment of existing debt. In order to facilitate the management of its capital requirements, the Group prepares annual expenditure budgets that are updated as necessary depending on various factors, including operating results, successful capital deployment and general industry conditions. The annual and updated budgets are approved by the board of directors of the Company. In order to maximize ongoing development efforts, the Group is committed to providing sustainable returns to
shareholders. The Group’s policy is to invest its short-term excess cash in fixed bank deposits with maturities of 1 year or less from the original date of acquisition, selected with regards to the expected timing of expenditures from its operations. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 105 -
- FINANCIAL INSTRUMENTS December 31,December 31, 20252024 US$’000US$’000 Financial assets Financial assets at amortised cost747,694376,116 Equity instruments at FVTOCI133,87548,411
Financial liabilities At amortised cost721,579936,349 Lease liabilities14,045928
Financial assets at amortised cost as at December 31, 2025 and 2024 respectively are as follows: December 31,December 31, 20252024 US$’000US$’000 Cash and cash equivalents399,402183,779 Term deposits305,884118,246 Restricted balances34,16266,698 Trade and other receivables (1) 8,2467,393
747,694376,116
Financial liabilities at amortised cost as at December 31, 2025 and 2024 are as follows: December 31,December 31, 20252024 US$’000US$’000 Accounts and other payables (2) 188,140194,174 Borrowings – Loans, other than syndicated loans183,570349,993 – Syndicated loans321,415364,359 Entrusted loan payable28,45427,823
721,579936,349
(1) Excluded VAT recoverable. (2) Excluded mining cost accrual, other accruals, payroll and benefit payable and other tax payables. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 106 -
- FINANCIAL INSTRUMENTS (Cont’d)
The Group’s financial instruments are exposed to certain financial risks including market risk (e.g. currency risk,
interest rate risk and other price risk), credit risk and liquidity risk. (a) Currency risk The Group is exposed to the financial risk related to the fluctuation of foreign exchange rates for the monetary assets and liabilities denominated in the currencies other than the functional currencies to which they related. The Group has not hedged its exposure to currency fluctuations. However, the Management monitors foreign exchange exposure and will consider hedging significant foreign currency exposure should the need arise. At the end of each reporting period, Huatailong and Skyland Mining Limited (note 37), of which its functional currency is RMB, had US$ denominated intra-group borrowings from Skyland (BVI) and the Company. The
intra-group borrowing is approximately US$21,629,000 (2024: US$20,898,000) as at December 31, 2025. The Group is mainly exposed to exchange rate fluctuation of RMB and US$. RMB monetary assets and (liabilities) December 31,December 31, 20252024 US$’000US$’000 Cash and cash equivalents40,65452,146 Term deposits305,884118,246 Trade receivables3,1781,427 Accounts and other payables(11,121)(11,729)
338,595160,090
Based on the above net exposures, and assuming that all other variables remain constant, a 5% (2024: 5%) depreciation/appreciation of the RMB against the US$ would result in an decrease/increase in the Group’s profit for the year of approximately US$14,390,000 (2024: US$6,804,000) for the year ended December 31, 2025. US$ monetary assets and (liabilities) December 31,December 31, 20252024 US$’000US$’000 Cash and cash equivalents–3 Inter-company loans(21,629)(20,898)
(21,629)(20,895)
Based on the above net exposures, and assuming that all other variables remain constant, a 5% (2024: 5%)
depreciation/appreciation of the US$ against the RMB would result in an increase/decrease in the Group’s
profit for the year of approximately US$984,000 (2024: US$951,000) for the year ended December 31, 2025.
In the Management’s opinion, the sensitivity analysis is unrepresentative of the inherent foreign exchange risk
as the year end exposure does not reflect the exposure during the year.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 107 -
- FINANCIAL INSTRUMENTS (Cont’d) (b) Interest rate risk Interest rate risk is the risk that the fair value in relation to term deposits, borrowings, entrusted loan payables and lease liabilities bearing fixed interest rate or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. December 31,December 31, 20252024 US$’000US$’000 Term deposits305,884118,246 Borrowings with fixed interest rates(82,518)(80,686) Entrusted loan payables(28,454)(27,823) Lease liabilities(14,045)(928)
Net carrying amounts180,8678,809
The Group is exposed to cash flow interest rate risk on the variable rate bank balances and restricted balances
and variable-rate bank borrowings (see note 25 for details of these borrowings).
Sensitivity analysis
The following analysis is prepared assuming the variable rate bank balances and restricted balances and variable-
rate bank borrowings outstanding at the end of the reporting period were outstanding for the whole year and
all other variables were held constant. A 25 basis point (2024: 25 basis points) increase or decrease is used
when reporting interest rate risk internally to key management personnel and represents the Management’s
assessment of the reasonably possible change in interest rates.
December 31,December 31,
20252024
US$’000US$’000
Cash and cash equivalents399,402183,779
Restricted bank balances34,16266,698
Borrowings with variable interest rates(422,467)(633,666)
Net carrying amounts11,097(383,189)
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 108 -
- FINANCIAL INSTRUMENTS (Cont’d) (b) Interest rate risk (Cont’d) Sensitivity analysis (Cont’d) The analysis below reflects the sensitivity that the interest rate may be higher/lower by 25 basis points (2024: 25 basis points). Year endedYear ended December 31,December 31, 20252024 US$’000US$’000 25 basis points (2024: 25 basis points) higher – Increase/(decrease) in profit for the year11(692) – Addition in finance costs capitalised7336
25 basis points (2024: 25 basis points) lower – (Decrease)/increase in profit for the year(11)692 – Reduction in finance costs capitalised(73)(36)
The Group monitors interest rate exposure and will consider hedging significant interest rate exposure should
the need arise.
(c) Other price risk
The Group is exposed to equity price risk through its investments in equity securities listed in Hong Kong.
The Group’s equity price risk is mainly concentrated on equity instruments operating in the mining industry
sector quoted on the Stock Exchange. In addition, the Group also invested in unquoted equity securities for
investees operating in the chemical and public utility industries for long term strategic purposes which had
been designated as FVTOCI. The Group has formed a team led by the Chief Financial Officer to monitor the
price risk and will consider hedging the risk exposure should the need arise.
Sensitivity analysis
The sensitivity analyses below have been determined based on the exposure to equity price risk at the
reporting date. No sensitivity analysis is presented for unlisted investments as the directors of the Company
consider the amounts of unlisted investments to be insignificant. If the prices of the respective listed equity
instruments had been 10% (2024: 10%) higher/lower, investments revaluation reserve would increase/decrease
by US$13,368,000 (2024: US$4,760,000) for the Group as a result of the changes in fair value of listed
investment at FVTOCI.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 109 -
- FINANCIAL INSTRUMENTS (Cont’d)
(d) Credit risk and impairment assessment
Credit risk is the risk of an unexpected loss if a customer or third party to a financial asset fails to meet its
contractual obligations. The Group sold approximately 100% (2024: 100%) of its gold to one creditworthy
customer, CNG, and approximately 100% (2024: 99%) of its copper and other by-product to CNG subsidiaries for the year ended December 31, 2025. The failure of these customers to make required payments could have a negative impact on the Group’s results. The Group manages this risk by demanding upfront payment for
sales of copper and other by-products and has set up monitoring procedures to ensure that follow-up action is taken for timely settlement of receivables from CNG, the CNG subsidiary and third-party customers. The Group reviews the recoverable amount of each individual trade debt at the end of the reporting period to ensure the adequate impairment losses are made for irrecoverable amounts. In addition, the Group performs impairment assessments using the ECL model on trade balances individually. In this regard, Management considers the
Group’s credit risk is significantly reduced. The Group does not hold any collateral over these balances. The Group applies the simplified approach to provide for ECL on trade receivables as permitted and prescribed by IFRS 9. The Management assessed the ECL on trade receivables individually. Based on the historical experience of
the Group, these trade receivables are generally recoverable due to the long term/on-going relationship and
good repayment record. As at December 31, 2025, included in the Group’s trade receivables balance are debtors with aggregate carrying amount of US$809,000 (2024: US$1,068,000) which are past due over 90 days as at the reporting date. The directors of the Company are of the opinion that no default has occurred for the past due balances and the
balances are still considered fully recoverable due to long-term/on-going relationships and good repayment
records from these customers. Movement in the allowance for credit losses of trade receivables: December 31,December 31, 20252024 US$’000US$’000 At January 1180105 Recognised of expected credit losses16478 Exchange realignment–(3)
At December 31344180
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 110 -
- FINANCIAL INSTRUMENTS (Cont’d)
(d) Credit risk and impairment assessment (Cont’d)
The Group was also exposed to credit risk on amount due from related parties and other receivables. The
Management periodically monitors the financial position of each of the related companies to ensure each
related company is financially viable to settle the amount due to the Group. The Management makes individual assessment on the recoverability of other receivables based on historical settlement records and past experience. The directors of the Company believe that there is no material credit risk inherent in the Group’s outstanding balance of other receivables except the receivable of the Tax and Other Surcharge, of which the impairment assessment has been disclosed in note 15. The Group’s bank deposits and restricted balances are held in PRC and Canadian financial institutions with
high credit ratings, where the credit risks on these bank deposits are limited. The Group had concentration of credit risk by geographical locations as the financial assets at amortised cost comprise various debtors which are located in the PRC for the years ended December 31, 2025 and 2024. Other than the concentration of balance with CNG and its subsidiaries, the Group does not have any other
significant concentration of credit risk. (e) Liquidity risk The Group operates in a capital intensive industry. The Group’s liquidity requirements arise principally from
the need for financing the expansion of its mining and processing operations. Liquidity risk is the risk that the Group will not be able to meet its financial obligations as they fall due. The
Group manages liquidity risk through the management of its capital structure and financial leverage as outlined in note 32. The Group manages its liquidity primarily through maintaining an adequate level of cash and cash equivalents and borrowings. In the management of the liquidity risk, the Group monitors and maintains a level of cash and cash equivalents deemed adequate by the management to finance the Group’s operations and mitigate the effects of fluctuations in cash flows. The Management monitors the utilisation of borrowings and ensures compliance with loan covenants. The Group relies on borrowings as a significant source of liquidity, details of which are set out in note 25. The following table details the Group’s remaining contractual maturities for its financial liabilities. The table is based on the undiscounted cash flows of financial liabilities based on the earliest date on which the Group
can be required to satisfy the liabilities. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 111 -
- FINANCIAL INSTRUMENTS (Cont’d) (e) Liquidity risk (Cont’d) To the extent that interest flows are floating rate, the undiscounted amount is derived from interest rate at the end of the reporting period: WeightedTotal averageWithin1 – 22 – 5Over 5undiscountedCarrying interest rate1 yearyearsyearsyearscash flowamount %US$’000US$’000US$’000US$’000US$’000US$’000 At December 31, 2025 Accounts and other payables163,2968,72317,446–189,465188,140 Entrusted loan payable2.4529,148–––29,14828,454 Borrowings2.51223,763112,941118,80170,426525,931504,985 Lease liabilities6.391,4349452,74631,04536,17014,045
417,641122,609138,993101,471780,714735,624
Weighted Total averageWithin1 – 22 – 5Over 5undiscountedCarrying interest rate1 yearyearsyearsyearscash flowamount %US$’000US$’000US$’000US$’000US$’000US$’000 At December 31, 2024 Accounts and other payables162,0698,52925,588–196,186194,174 Entrusted loan payable2.4569128,522––29,21327,823 Borrowings2.49162,589266,478223,395101,203753,665714,352 Lease liabilities4.67510479––989928
325,859304,008248,983101,203980,053937,277
(f) Fair value
The following table presents the fair value of the Group’s financial instruments measured at the end of the
reporting period on a recurring basis, categorised into the three-level fair value hierarchy as defined in HKFRS
13, Fair value measurement. The level into which a fair value measurement is classified is determined with
reference to the observability and significance of the inputs used in the valuation technique as follows:
Level 1: Fair value measured using only Level 1 inputs i.e. unadjusted quoted prices in active markets for
identical assets or liabilities at the measurement date
Level 2: Fair value measured using Level 2 inputs i.e. observable inputs which fail to meet Level 1, and not
using significant unobservable inputs. Unobservable inputs are inputs for which market data are
not available
Level 3: Fair value measured using significant unobservable inputs
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 112 -
-
FINANCIAL INSTRUMENTS (Cont’d) (f) Fair value (Cont’d) Equity instruments at FVTOCI – listed equity securities and unlisted equity securities are measured at fair value based on the quoted bid price in an active market (Level 1) and the discounted cash flow models (Level 3)
respectively. The fair values of the unlisted equity securities are considered insignificant. The fair values of
other financial assets and financial liabilities measured at amortised cost are determined in accordance with
generally accepted pricing models based on discounted cash flow analysis. Other non-current assets – recoverable amounts of other non-current assets are measured at fair value less
costs of disposal. The fair value measurement are determined using residual method under market approach. The key inputs were the forecast selling prices for the completed shops and apartments, and the estimated
cost to complete and decorate the building. The forecast selling price and the estimated cost to complete are positively related and inversely related to the fair value, respectively. The Group considers that the carrying amounts of financial assets and financial liabilities recorded at amortised cost in the consolidated financial statements approximate their fair values. There was no transfer amongst level 1, 2 and 3 in the current and prior years. -
COMMITMENTS December 31,December 31, 20252024 US$’000US$’000 Capital expenditure in respect of acquisition of property, plant and equipment in the consolidated financial statements – contracted but not provided for9,4686,113
-
RETIREMENT BENEFITS SCHEMES The employees of the Group’s subsidiaries are members of a state-managed retirement benefits scheme operated by the PRC government. The subsidiaries are required to contribute a certain percentage of payroll cost to the retirement benefits scheme to fund the benefits. The only obligation of the Group with respect to the retirement benefits scheme is to make the specified contributions. The total cost charged to the consolidated statement of profit or loss and other comprehensive income of approximately US$9,953,000 for the year ended December 31, 2025 (2024: US$8,140,000), represent contributions payable to
the scheme by the Group. NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 113 -
- RECONCILIATION OF LIABILITIES ARISING FROM FINANCING ACTIVITIES
The table below details changes in the Group’ liabilities arising from financing activities, including both cash and
non-cash changes. Liabilities arising from financing activities are those for which cash flows were, or future cash
flows will be, classified in the Group’s consolidated statement of cash flows as cash flows from financing activities. Entrusted loanLeaseDividend BorrowingspayableliabilitiespayablesTotal US$’000US$’000US$’000US$’000US$’000 (note 25)(note 26)(note 27) At January 1, 2025714,35227,823928–743,103 Financing cash flows(220,219)–(514)(32,952)(253,685) Dividend declared by the Company–––31,71331,713 Dividend declared by subsidiaries of the Company–––1,2391,239 Exchange difference arising
on translation10,85263119911,682 Accrued interest expenses––848–848 Non-cash transactions––12,584–12,584
At December 31, 2025504,98528,45414,045–547,484
Entrusted loanLeaseDividend
BorrowingspayableliabilitiespayablesTotal
US$’000US$’000US$’000US$’000US$’000
(note 25)(note 26)(note 27)
At January 1, 2024738,23428,2381,477–767,949
Financing cash flows(14,322)–(599)(1,250)(16,171)
Dividend declared by
subsidiaries of the Company–––1,2501,250
Exchange difference arising
on translation(9,560)(415)––(9,975)
Unrealised foreign exchange
loss, net––(16)–(16)
Accrued interest expenses––66–66
At December 31, 2024714,35227,823928–743,103
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 114 -
- PARTICULARS OF SUBSIDIARIES Details of the Company’s subsidiaries at December 31, 2025 and 2024 are as follows: Place and dateIssued and fullyEquity interest of incorporation/Place ofpaid share capital/attributable to the Group Name of subsidiariesestablishmentoperationregistered capitalas at December 31,Principal activities 20252024 Pacific PGM Inc.British Virgin Islands
(“BVI”)
May 17, 2001
BVIUS$100100%100%Investment holding
Pacific PGM (Barbados) Inc.Barbados
September 6, 2007
BarbadosUS$250,000100%100%Investment holding
IMP
(1)
PRC
April 29, 2002
PRCUS$45,000,00096.5%96.5%Engaged in exploration and
development of mining
properties in China
Skyland Mining LimitedBarbados
October 6, 2004
BarbadosUS$233,380,700
plus RMB1,510,549,032
100%100%Investment holding
Jia Ertong
(1)
PRC
October 31, 2003
PRCUS$273,920,000100%100%Exploration, development and
mining of mineral properties
and investment holding
Huatailong
(1)
PRC
January 11, 2007
PRCRMB1,760,000,000100%100%Exploration, development and
mining of mineral properties
Jiama Industry and Trade
(1)
PRC
December 1, 2011
PRCRMB5,000,00051%51%Mining logistics and transport
business
Skyland (BVI)
(2)
BVI
October 26, 2010
BVIUS$1n/a100%Issue of bonds
(1)
Domestic limited liability company.
(2)
On November 5, 2024, the dissolution of Skyland (BVI) was approved by the official department and the final dissolution was
completed on February 5, 2025.
None of the subsidiaries had issued any debt securities at the end of both years. Other than Pacific PGM Inc. and
Pacific PGM (Barbados) Inc. (2024: Pacific PGM Inc., Pacific PGM (Barbados) Inc. and Skyland (BVI)) which are
directly held by the Company, all other subsidiaries listed above are indirectly held under the Group.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2025
- 115 -
- STATEMENT OF FINANCIAL POSITION OF THE COMPANY December 31,December 31, 20252024 US$’000US$’000 Current assets Cash and cash equivalents20,3034,704 Other receivables10384 Prepaid expenses and deposits7839
20,4844,827
Non-current assets Right-of-use assets18327 Equity instruments at FVTOCI (note 19)133,67847,599 Investments in subsidiaries (note 37)987,015987,016
1,120,8761,034,642
Total assets1,141,3601,039,469
Current liabilities Other payable and accrued expenses2,2432,248 Borrowings79,00079,000 Lease liabilities6132 Amounts due to subsidiaries21,8151,335
103,11982,615
Net current liabilities(82,635)(77,788)
Total assets less current liabilities1,038,241956,854
Non-current liabilities Lease liabilities125– Deferred income–19
12519
Total liabilities103,24482,634
Owners’ equity Share capital (note 29)1,229,0611,229,061 Reserves (note 39)115,84830,384 Accumulated losses (note 39)(306,793)(302,610)
Total owners’ equity1,038,116956,835
Total liabilities and owners’ equity1,141,3601,039,469
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
- 116 -
- RESERVES AND DEFICITS OF THE COMPANY Accumulated ReserveslossesTotal US$’000US$’000US$’000 At January 1, 202429,113(254,944)(225,831)
Loss for the year–(47,666)(47,666) Fair value gain on equity instruments at FVTOCI1,271–1,271
Total comprehensive income/(loss) for the year1,271(47,666)(46,395)
At December 31, 202430,384(302,610)(272,226)
Loss for the year–27,53027,530 Fair value gain on equity instruments at FVTOCI85,464–85,464 Dividend paid to shareholders–(31,713)(31,713)
Total comprehensive income/(loss) for the year85,464(4,183)81,281
At December 31, 2025115,848(306,793)(190,945)
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2025
-
117 -
-
118 - FIVE-YEAR FINANCIAL SUMMARY The consolidated results and assets and liabilities of the Group for the last five financial years, as extracted from the
audited financial statements are as follows: Year ended December 31 20252024202320222021 US$’000US$’000US$’000US$’000US$’000 RESULTS Revenue1,310,125756,646459,4341,104,9491,137,356
Profit (loss) attributable to owners of the Company467,09362,732(25,500)222,743267,361
At December 31 20252024202320222021 US$’000US$’000US$’000US$’000US$’000 ASSETS AND LIABILITIES Total assets3,356,5352,935,9792,834,7163,194,9113,257,043 Total liabilities(1,019,509)(1,149,773)(1,106,975)(1,291,481)(1,423,651)
Net assets2,337,0261,786,2061,727,7411,903,4301,833,392
Equity attributable to owners of the Company2,309,1411,762,4381,706,8581,883,9791,815,922 Non-controlling interests27,88523,76820,88319,45117,470
Total owners’ equity2,337,0261,786,2061,727,7411,903,4301,833,392
CORPORATE GOVERNANCE
The Company has complied with the code provisions under the Code on Corporate Governance Practices
(the “Code”) set out in Appendix C1 to the Rules Governing the Listing of Securities on the Stock
Exchange of Hong Kong Limited (the “Listing Rules”) during the year ended December 31, 2025.
MODEL CODE FOR SECURITIES TRANSACTIONS
The Company has adopted policies in its Corporate Disclosure, Confidentiality and Securities Trading
Policy that has terms which are no less exacting than those set out in Appendix C3 to the Listing Rules
(the “Model Code”). The Board is pleased to confirm, after specific enquiries with all Directors, that
all Directors have fully complied with standards required according to the Model Code during the year
ended December 31, 2025.
PURCHASE, SALE OR REDEMPTION OF THE COMPANY’S LISTED SECURITIES
For the year ended December 31, 2025, neither the Company nor any of its subsidiaries has purchased,
sold or redeemed any of the Company’s listed securities.
AUDIT COMMITTEE
Pursuant to the requirements of the Code and the Listing Rules, the Company has established an audit
committee (the “Audit Committee”) comprising all the existing Independent Non-executive Directors,
namely Mr. Yingbin Ian He,(Chairman of the Audit Committee), Mr. Wei Shao, Mr. Bielin Shi, and
Ms. Ruixia Han.
The Audit Committee has reviewed the audited consolidated financial statements for the year ended
December 31, 2025, and is of the view that the Group’s audited consolidated financial statements for
the year ended December 31, 2025 are prepared in accordance with the applicable accounting standard,
laws and regulations, and appropriate disclosures have already been made.
By Order of the Board
China Gold International Resources Corp. Ltd.
Mr. Chenguang Hou
Chairman and Chief Executive Officer
Hong Kong, March 31, 2026
As at the date of this announcement, the Board of Directors of the Company comprises of Mr Chenguang
Hou, Mr. Yuanhui Fu, and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non-Executive
Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Mr. Bielin Shi, and Ms. Ruixia (Rane) Han as
Independent Non-executive Directors.
- 119 -
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
NOTICE OF BOARD MEETING The board of directors (the “Board”) of China Gold International Resources Corp. Ltd. (the “Company”) hereby announces that a meeting of the Board will be held on Monday, 30 March 2026, Beijing time, being Sunday, 29 March 2026, Vancouver time, for the purpose of, among other matters, considering and, if thought appropriate, approving the annual results of the Company and its subsidiaries for the year ended 31 December 2025.
By order of the Board China Gold International Resources Corp. Ltd. Mr. Chenguang Hou Chairman and Chief Executive Officer
Hong Kong, 12 March 2026 As at the date of this announcement, the Board of Directors of the Company comprises of Mr. Chenguang Hou, Mr. Yuanhui Fu and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non‐executive Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Mr. Bielin Shi and Ms. Ruixia (Rane) Han as Independent Non‐executive Directors.
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
NOTICE OF BOARD MEETING The board of directors (the “Board”) of China Gold International Resources Corp. Ltd. (the “Company”) hereby announces that a meeting of the Board will be held on Monday, 30 March 2026, Beijing time, being Sunday, 29 March 2026, Vancouver time, for the purpose of, among other matters, considering and, if thought appropriate, approving the annual results of the Company and its subsidiaries for the year ended 31 December 2025.
By order of the Board China Gold International Resources Corp. Ltd. Mr. Chenguang Hou Chairman and Chief Executive Officer
Hong Kong, 12 March 2026 As at the date of this announcement, the Board of Directors of the Company comprises of Mr. Chenguang Hou, Mr. Yuanhui Fu and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non‐executive Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Mr. Bielin Shi and Ms. Ruixia (Rane) Han as Independent Non‐executive Directors.
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
Overseas Regulatory Announcement VANCOUVER, January 27, 2026 – China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) provides its 2026 annual production guidance. Please see the attached announcement for more details.
By order of the Board China Gold International Resources Corp. Ltd. Mr. Chenguang Hou Chairman and Chief Executive Officer
Hong Kong, January 28, 2026
As at the date of this announcement, the Board of Directors of the Company comprises of Mr. Chenguang Hou, Mr. Yuanhui Fu and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non-Executive Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Ms. Ruixia (Rane) Han and Mr. Bielin Shi as Independent Non‐Executive Directors.
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
China Gold International Resources Provides 2026 Annual Production Guidance VANCOUVER, January 27, 2026 - China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) (“China Gold International Resources” or the “Company”) provides 2026 annual production guidance. 2026 Annual Production Guidance The Jiama Mine:
The copper production will be approximately between 140 million pounds (63,500 tonnes) and 149 million pounds (67,500 tonnes); The gold production will be approximately between 70,732 ounces (2.2 tonnes) and 75,554 ounces (2.35 tonnes); The silver production will be approximately between 4.18 million ounces (130 tonnes) and 4.82 million ounces (150 tonnes);
The CSH Mine:
The total gold production is estimated between 70,732 ounces (2.2 tonnes) and 83,592 ounces (2.6 tonnes).
The Company’s Chairman and CEO, Mr. Chenguang Hou, said, “China Gold International has achieved a historic best performance in 2025, posting record-breaking net profits in two consecutive quarters. This reflects the Company’s outstanding operational capabilities. For 2026, the Company will deliver consolidated and steady progress at both mines by implementing the development roadmap for the Jiama Mine while intensifying efforts to develop the underground resources and enhance comprehensive resources utilization at the CSH Mine. Our objective is to deliver sustainable returns for shareholders through continued strong performance.” 2025 Final Year-End Results The Company expects to report its audited 2025 Financial Statements, Notes to the Financial Statements and Management’s Discussion and Analysis by the end of March 2026. In connection with the release, the management will hold its annual roadshow events to discuss the Company’s year-end results and performance.
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
About China Gold International Resources China Gold International Resources is a gold and base metal mining company incorporated in BC, Canada and operates two mines, the CSH Gold Mine in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine in Tibet, China. The Company’s objective is to build shareholder value through growing production at its current mining operations, expanding its resource base, and acquiring and developing new projects internationally. The Company is listed on the Toronto Stock Exchange (TSX: CGG) and the Main Board of The Stock Exchange of Hong Kong Limited (HKEX: 2099).
(a company incorporated under the laws of British Columbia, Canada with limited liability)
(Hong Kong Stock Code: 2099) (Toronto Stock Code: CGG)
Overseas Regulatory Announcement VANCOUVER, January 27, 2026 – China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) provides its 2026 annual production guidance. Please see the attached announcement for more details.
By order of the Board China Gold International Resources Corp. Ltd. Mr. Chenguang Hou Chairman and Chief Executive Officer
Hong Kong, January 28, 2026
As at the date of this announcement, the Board of Directors of the Company comprises of Mr. Chenguang Hou, Mr. Yuanhui Fu and Ms. Na Tian as Executive Directors, Mr. Wanming Wang as Non-Executive Director, and Mr. Yingbin Ian He, Mr. Wei Shao, Ms. Ruixia (Rane) Han and Mr. Bielin Shi as Independent Non‐Executive Directors.
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
China Gold International Resources Provides 2026 Annual Production Guidance VANCOUVER, January 27, 2026 - China Gold International Resources Corp. Ltd. (TSX: CGG; HKEX: 2099) (“China Gold International Resources” or the “Company”) provides 2026 annual production guidance. 2026 Annual Production Guidance The Jiama Mine:
The copper production will be approximately between 140 million pounds (63,500 tonnes) and 149 million pounds (67,500 tonnes); The gold production will be approximately between 70,732 ounces (2.2 tonnes) and 75,554 ounces (2.35 tonnes); The silver production will be approximately between 4.18 million ounces (130 tonnes) and 4.82 million ounces (150 tonnes);
The CSH Mine:
The total gold production is estimated between 70,732 ounces (2.2 tonnes) and 83,592 ounces (2.6 tonnes).
The Company’s Chairman and CEO, Mr. Chenguang Hou, said, “China Gold International has achieved a historic best performance in 2025, posting record-breaking net profits in two consecutive quarters. This reflects the Company’s outstanding operational capabilities. For 2026, the Company will deliver consolidated and steady progress at both mines by implementing the development roadmap for the Jiama Mine while intensifying efforts to develop the underground resources and enhance comprehensive resources utilization at the CSH Mine. Our objective is to deliver sustainable returns for shareholders through continued strong performance.” 2025 Final Year-End Results The Company expects to report its audited 2025 Financial Statements, Notes to the Financial Statements and Management’s Discussion and Analysis by the end of March 2026. In connection with the release, the management will hold its annual roadshow events to discuss the Company’s year-end results and performance.
China Gold International Resources Corp. Ltd.
Suite 1780 400 Burrard Street Vancouver, BC Canada V6C 3A6
About China Gold International Resources China Gold International Resources is a gold and base metal mining company incorporated in BC, Canada and operates two mines, the CSH Gold Mine in Inner Mongolia, China and the Jiama Copper-Gold Polymetallic Mine in Tibet, China. The Company’s objective is to build shareholder value through growing production at its current mining operations, expanding its resource base, and acquiring and developing new projects internationally. The Company is listed on the Toronto Stock Exchange (TSX: CGG) and the Main Board of The Stock Exchange of Hong Kong Limited (HKEX: 2099).
Prompts
Click prompts to add them under the company line, click again to take one out, then copy the result into your AI chat. Shared by Asian Century Stocks and Uncovered Thai Stocks. Thank you.
ETFs Holding China Gold Int'l Resources Corp. Ltd.
Exchange-traded funds whose newest published daily portfolio holds one of the company's listings, largest weight first.
| ETF | Weight in ETF | Shares | Market value | As of |
|---|---|---|---|---|
| MEMA | 0.47% | 1,800 | $ 58.827K | Aug 31, 2026 |
| EMMF | 0.29% | 32,900 | $ 513.928K | Jun 30, 2026 |
| AVES | 0.25% | 180,200 | $ 3.621M | Nov 16, 2026 |
| DFEM | 0.14% | 551,000 | $ 12.088M | Nov 12, 2026 |
| DFSE | 0.13% | 34,600 | $ 759.073K | Nov 12, 2026 |
| DEHP | 0.10% | 17,900 | $ 392.699K | Nov 12, 2026 |
| DFAX | 0.07% | 407,135 | $ 8.866M | Nov 12, 2026 |
| DFAE | 0.05% | 226,800 | $ 4.976M | Nov 12, 2026 |
| AVEM | 0.05% | 639,000 | $ 12.839M | Nov 16, 2026 |
| DFAI | 0.00% | 184 | $ 3,936.22 | Nov 12, 2026 |