THIRD QUARTER 2026 CONFERENCE CALL APPENDIX October 29, 2026 CAUTION REGARDING FORWARD-LOOKING STATEMENTS Both these slides and the accompanying oral presentation contain certain forward-looking information and forward-looking statements as defined…
THIRD QUARTER 2026
CONFERENCE CALL
APPENDIX
October 29, 2026
CAUTION REGARDING FORWARD-LOOKING STATEMENTS
Both these slides and the accompanying oral presentation contain certain forward-looking information and forward-looking statements as defined in applicable securities laws (collectively referred to as forward-looking statements). These statements relate to future events or our future performance. All statements other than
statements of historical fact are forward-looking statements. The use of any of the words “anticipate”, “plan”, “likely”, “can”, “could”, “continue”, “estimate”, “expect”, “may”, “will”, “project”, “predict”, “potential”, “should”, “would”, “can”, “could”, “believe” and similar expressions is intended to identify forward-looking
statements. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. These statements speak only as of the date of this presentation.
These forward-looking statements include, but are not limited to, statements concerning: our focus and strategy, including being a pure-play energy transition metals company; anticipated global and regional supply, demand and market outlook for our commodities; our business, assets, and strategy going forward, including with
respect to future and ongoing project development; our expectations with respect to a disciplined execution of our business plans and integration across mine and plant activities; our ability to complete the Merger with Anglo American, including timing of completion, the ability to meet customary closing conditions and our ability
to receive applicable approvals; our expectations with respect to the Merger with Anglo American and integration planning, including readiness, maintaining safe and reliable operations, and business continuity; our ability to achieve operational resilience and corporate synergies with Anglo American, including the potential
synergies between QB and Collahuasi, and other projects and operations; our expectations with respect to the Strategic Investment Agreement with Canada Growth Fund Inc. and Natural Resources Canada, including the ability to negotiate and execute definitive agreements, and the satisfaction of applicable approvals; our
expectations regarding cost, timing and completion of HVC MLE; our expectations with respect to our ability to continue operations as currently expected, including any potential changes to our guidance or production; our expectations regarding cost, timing and achievement of the QB Action Plan, including completion of TMF
development initiatives, Rock Bench 6 and installation of remaining permanent tailings infrastructure and water management at QB to support steady state operations; our expectations with respect to improved recoveries at QB and achieve design rates in the mine, concentrator and molybdenum plant; the continued consistent
production and future optimization of our QB operations; the occurrence and length of any potential downtime at our operations; our expectations with respect to operations at Carmen de Andacollo; our expectations with respect to the impact from the severe winter storms and adverse weather conditions affecting Chile and HVC,
including impacts on Teck's operations and guidance; our expectations with respect to the timing and format of any cash returns to shareholders; our expectations with respect to the resumption of full operations at Carmen de Andacollo; our expectations with respect to Teck's updated operating strategy and production at Trail;
our expectations with respect to the production and sales volume at Red Dog; our expectations with respect to shipping at our operations, including future transportation and freight costs; potential raw material constraints on our business; our expectations with respect to the occurrence, timing and length of maintenance
shutdowns and equipment replacement; expectations regarding inflationary pressures and our ability to manage controllable operating expenditures, including potential government intervention; the uncertainty surrounding the status of various worldwide tariffs and the impact on the mining industry; expectations with respect to
the potential impact of any tariffs, countervailing duties or other trade restrictions, including the impact on trade flows, demand for our products and general economic conditions and our ability to manage our sale arrangements to minimize any impacts or maintain compliance with any exemptions provided; our expectations with
respect to geopolitical risk and the impact on trade, commodities and the financial market, including the conflict in the Middle East, the closure of the Strait of Hormuz, supply chain disruptions, government interventions and oil and diesel cost increases and supply disruptions; our expectations with respect to the impact of the WTI
crude oil prices and Teck's fuel consumption; our expectations with respect to execution of our copper growth strategy, including the timing and occurrence of any sanction decisions and prioritization and amount of planned growth capital expenditures; expectations regarding advancement of our copper growth portfolio projects,
including advancement of studies, permitting, land access, execution planning, detailed engineering and design, risk mitigation, and advanced early works, community and Indigenous engagement, completion of updated cost estimates, tendering processes, and timing for receipt of permits related to QB optimization, QB Asset
Expansion, the Red Dog MLE, the HVC MLE, San Nicolás, and Zafranal projects, as applicable; our expectations with respect to the timing of completion and cost of the HVC MLE; the ability of our partners to participate in the funding of the Zafranal project; our expectations and results with respect to the royalties on our operations;
expectations with respect to timing and outcome of the regulatory approvals process for our copper growth projects; expectations for copper growth capital expenditures to progress our medium- to long-term projects, including Galore Creek, Schaft Creek, NewRange, and NuevaUnion; our expectations regarding safety at our Teckcontrolled operations; expectations regarding our effective tax rate and potential tax payments; expectations regarding after-tax impairments or reversals; liquidity and availability of borrowings under our credit facilities; requirements to post and our ability to obtain additional credit for posting security for reclamation at our sites;
expectations for our general and administration and research and innovation costs and costs related to the enterprise resource planning system; profit and loss expectations; our expectations with respect to potential results of any litigation, arbitration or regulatory action; copper price market trends and expectations; our
expectations with respect to foreign demand for our materials; our ability to continue to declare dividends; mineral grades; all guidance appearing in this document including but not limited to the production, sales, cost, unit cost, capital expenditure, capitalized stripping, operating outlook, and other guidance under the headings
“Guidance” and "Outlook" and as discussed elsewhere in the various reportable segment sections; and expectations regarding the adoption of new accounting standards and the impact of new accounting developments.
Actual results and developments are likely to differ, and may differ materially, from those expressed or implied by the forward-looking statements contained in this presentation. These statements are based the information available at the time those statements are made and are of good faith belief of the officers and directors of
Teck as of the time with respect to future events and are subject to a number of assumptions, including, but not limited to, assumptions disclosed elsewhere in this document and assumptions regarding general business and economic conditions, interest rates, commodity and power prices; the completion of the merger with Anglo
American and integration planning; the potential corporate synergies between Anglo American and Teck; acts of foreign or domestic governments and the outcome of legal proceedings; the imposition of tariffs, import or export restrictions, or other trade barriers or retaliatory measures by foreign or domestic governments; the
continued operation of QB in accordance with our expectations; our ability to advance TMF development initiatives as expected and the occurrence and length of any potential maintenance downtime; expectations and assumptions with respect to HVC MLE capital cost estimate and expected project economics; expectations with
respect to the timing and completion of the HVC MLE; the possibility that our business may not perform as expected or in a manner consistent with historical performance; the supply and demand for, deliveries of, and the level and volatility of prices of copper and zinc and our other metals and minerals, as well as steel, crude oil,
natural gas and other petroleum products; future WTI crude oil prices; fuel consumption; the timing of the receipt of permits and other regulatory and governmental approvals for our development projects and other operations, including mine life extensions; positive results from the studies on our expansion and development
projects; our ability to secure adequate transportation, including rail and port services, for our products; our costs of production and our production and productivity levels, as well as those of our competitors; continuing availability of water and power resources for our operations; changes in credit market conditions and conditions
in financial markets generally; the availability of funding to refinance our borrowings as they become due or to finance our development projects on reasonable terms; availability of letters of credit and other forms of financial assurance acceptable to regulators for reclamation and other bonding requirements; our ability to procure
equipment and operating supplies in sufficient quantities and on a timely basis; the availability of qualified employees and contractors for our operations, including our new developments and our ability to attract and retain skilled employees; the satisfactory negotiation of collective agreements with unionized employees; our ability
to maintain our relationship with respect to our collective agreements and unionized employees; our ability to improve or maintain the HPI frequency rate at Teck-controlled operations; the impact of changes in Canadian-U.S. dollar, Canadian dollar-Chilean Peso and other foreign exchange rates on our costs and results;
engineering and construction timetables and capital costs for our development and expansion projects; operating costs and capital expenditure estimates for our operations; our ability to develop technology and obtain the benefits of technology for our operations and development projects; closure costs; environmental
compliance costs; market competition; the accuracy of our mineral reserve and resource estimates (including with respect to size, grade and recoverability) and the geological, operational and price assumptions on which these are based; tax benefits and statutory and effective tax rates; the outcome of our copper, zinc and lead
concentrate treatment and refining charge negotiations with customers; favourable weather conditions for shipment and operations; China’s market demand for critical minerals; India’s growth and market demand for critical minerals; the resolution of environmental and other proceedings or disputes; our ability to obtain, comply
with and renew permits, licenses and leases in a timely manner; and our ongoing relations with our employees and with our business and joint venture partners.
Our Guidance tables include disclosure and footnotes with further assumptions relating to our guidance, and assumptions for certain other forward-looking statements accompany those statements within the presentation. Statements concerning future production costs or volumes are based on numerous assumptions regarding
operating matters and on assumptions that demand for products develops as anticipated, that customers and other counterparties perform their contractual obligations, that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts and supplies, labour disturbances, interruption
in transportation or utilities, or adverse weather conditions, and that there are no material unanticipated variations in the cost of energy or supplies. The foregoing list of assumptions is not exhaustive. Events or circumstances could cause actual results to vary materiality. Factors that may cause actual results to vary materially
include, but are not limited to: changes in commodity and power prices; changes in market demand for our products; changes in interest and currency exchange rates; acts of governments and the outcome of legal proceedings, including indemnification claims; ability for Teck to satisfy all conditions precedent for closing of the
merger; ability for Teck to receive necessary approvals to complete the merger; costs related to the merger; the imposition of tariffs, import or export restrictions, or other trade barriers or retaliatory measures by foreign or domestic governments; geopolitical uncertainty and conflict; industry growth uncertainty; supply chain
disruptions, including the closure of certain trade routes; commodity supply and supply chain volatility; inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and resources); operational difficulties (including failure of plant, equipment or processes to
operate in accordance with specifications or expectations, cost escalation, unavailability of labour, materials and equipment); government action or delays in the receipt of government approvals; changes in royalty or tax rates; industrial disturbances or other job action; adverse weather conditions; unanticipated events related to
health, safety and environmental matters; union labour disputes or strikes; political risk; social unrest; failure of customers or counterparties (including logistics suppliers) to perform their contractual obligations; changes in our credit ratings; unanticipated increases in costs to construct our development projects; difficulty in
obtaining permits; inability to address concerns regarding permits or environmental impact assessments; changes in laws and mining regulations; potential changes to CUSMA; changes in Canadian property law and ownership title; and changes or further deterioration in general economic conditions. The amount and timing of
capital expenditures is dependent upon, among other matters, being able to secure permits, equipment, supplies, materials and labour on a timely basis and at expected costs. Certain operations and projects are not controlled by us; schedules and costs may be adjusted by our partners, and timing of spending and operation of
the operation or project is not in our control. Certain of our other operations and projects are operated through joint arrangements where we may not have control over all decisions, which may cause outcomes to differ from current expectations. Ongoing monitoring may reveal unexpected environmental conditions at our operations
and projects that could require additional remedial measures. Production at our QB and Red Dog operations may also be impacted by water levels at site. Sales to China may be impacted by general and specific port restrictions, Chinese regulation and policies, and normal production and operating risks.
We assume no obligation to update the forgoing list and Teck cautions that the foregoing list of important factors and assumptions is not exhaustive. Other events or circumstances could cause our actual results to differ materially from those estimated or projected and expressed in, or implied by, our forward-looking statements.
See also the risks and assumptions discussed under “Risk Factors” in our most recent Annual Information Form and in subsequent filings, which can be found under our profile on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under cover of Form 40-F, as well as subsequent filings that can also be found under our
profile. The forward-looking statements contained in these slides and accompanying presentation describe Teck’s expectations at the date hereof and are subject to change after such date. Except as required by law, we undertake no obligation to update publicly or otherwise revise any forward-looking statements or the foregoing
list of assumptions, risks or other factors, whether as a result of new information, future events or otherwise.
Technical Information
The scientific and technical information in this presentation relating to Teck’s assets was reviewed and approved by Jason Sangha, P.Eng., Vice President, Technical & Planning, an officer of Teck and a Qualified Person as defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Unless otherwise
stated, scientific and technical information concerning Teck’s assets is summarized, derived or extracted from Teck’s annual information form dated February 18, 2026 available on sedarplus.ca which contains information on the key assumptions, parameters, and methods used to estimate the mineral resources and mineral
reserves and risks that could affect the potential development of the mineral resources or mineral reserves.
2
TABLE OF CONTENTS
Merger of Equals
Operations
Copper Growth Options
Zinc Development Options
Macro and Metals Outlook
Reference
3
MERGER OF
EQUALS WITH
ANGLO AMERICAN
4
VALUE CREATION THROUGH MERGER OF EQUALS
Opportunity to participate in
future value creation
• Maintain full investment and
exposure to future upside
• The Anglo special dividend
increases Teck shareholder
participation to 37.6%
World-class portfolio and
improved growth prospects
Compelling value creation
through synergies
Top 5 global copper producer,
with significant re-rating
potential
• Near-term debottlenecking at QB,
Collahuasi, Quellaveco and Kumba
UHDMS
• US$800M1 annual recurring pre-tax
synergies
• Highly attractive portfolio to
capitalize upon compelling copper
fundamentals
• Medium-term synergy capture
including at QB and Collahuasi
and at Los Bronces, Andina,
Zafranal and San Nicolás
• Long-term brownfield and
greenfield expansions optionality
• Highly capital efficient
QB-Collahuasi adjacencies
• US$1.4B2 annual underlying
EBITDA* uplift from ~175kpta
incremental copper production
Merger subject to customary closing and regulatory conditions.
- EBITDA and underlying EBITDA are non-GAAP financial measures. See “Non-GAAP Financial Measures and Ratios” slide.
• Increased scale and market
position is expected to expand
access to a deeper pool of
investors
5
UNLOCKING THE FULL POTENTIAL OF QB-COLLAHUASI
Value accretive additional production from one of the largest copper complexes
QB plant
Collahuasi
Ore Reserve grade 0.96% TCu2
44% Anglo American
QB
Mineral Reserve grade 0.52%1
60% Teck
Additional Production
~175kt
Incremental annual copper production potential
from processing softer, higher-grade
Collahuasi ore through QB plant (100% basis)3
Underlying EBITDA* Uplift
US$1.4B
Average annual basis from 2030-2049 but
expected to continue beyond this period
(100% basis)3
- Underlying EBITDA is a non-GAAP financial measure. See “Non-GAAP Financial Measures and Ratios” slide.
Capital Efficient
~US$11,000/t
Cost-effective growth with lower capital
investment requirements than standalone
extension or expansion options
6
UNPACKING QB–COLLAHUASI INCREMENTAL PRODUCTION
Value-accretive, capital efficient additional production
Illustrative QB Production
1
Grade
•
~+175kt3
2
3
Throughput
•
One line of the plant will be fed with ore from Collahuasi with the second continuing to
process QB ore
•
Processing softer Collahuasi ore through modern QB plant allows for increase in throughput
•
Results in a 50% increase in throughput for the line processing Collahuasi ore
Recoveries
•
4
5
6
Debottlenecked
QB production
Grade
Throughput
Recoveries
1
2
3
QB-Collahuasi
upside
Collahuasi reserve grade at 0.96%1, higher than QB reserve grade at 0.52%2
Lower recoveries due to larger grind size and mineralogy of Collahuasi ore
Operating Cost
•
Increased mining costs to reflect higher strip ratio at Collahuasi
•
Fixed cost economies of scale expected to result in marginal reduction in unit costs
Capital
•
Limited additional infrastructure required – additional floatation tanks, ancillary equipment
~15km overland conveyor plus enlarged mine fleet
•
~US$1.9B preliminary capex estimate or capital intensity of US$11,000/t copper production
Timeline
•
Synergies expected to be delivered as early as 2030
•
Expect 2-3 years for studies and permitting and up to two years for construction
7
CREATING ONE OF THE LARGEST GLOBAL COPPER COMPLEXES
QB-Collahuasi could be a leading global producer for decades
Copper Resources4
2030 Copper Production1
~QB-Collahuasi
incremental production2
3
~Los Bronces-Andina
adjacency3
4
Measured and Indicated
Resource grade and tonnages are inclusive of reserves.
Inferred
8
MERGER OF EQUALS HAS MULTIPLE VALUE DRIVERS
From synergies and near-term asset optimization to future growth optionality
Corporate synergies
Corporate, Business
Overheads & Other
~US$210M
Near-term growth through
asset optimization2
Medium-term capital
efficient adjacencies
Future growth
optionality
QB Debottlenecking
QB + Collahuasi
~175ktpa Cu – US$1.4B3 annual
underlying EBITDA* uplift
Medium Term Developments
San Nicolás
Zafranal
Increase throughput to 165-185ktpd
Los Bronces Plant Restart
Throughput increase from
reopening the Los Bronces plant
Collahuasi Debottlenecking
~US$800M
annual, recurring, pre-tax
synergies1
Increase throughput to 210ktpd
Quellaveco Stage 1 Expansion
Increase throughput to 142ktpd
Highland Valley Copper MLE
Life extension underway to extend mine
life to 2046
Kumba UHDMS
Procurement
~US$490M
Marketing
~US$100M
Increasing premium product mix,
option to extend mine life to 2044
Merger subject to customary closing and regulatory conditions.
- EBITDA and underlying EBITDA are non-GAAP financial measures. See “Non-GAAP Financial Measures and Ratios” slide.
of incremental copper production from
2030-2049 but expected to continue beyond
this period (100% basis)2
Los Bronces + Andina
~120ktpa Cu – US$5B2 pre-tax NPV
of incremental copper production
(21 years from 2030, 100% basis)
Minas-Rio + Serpentina
Potential additional high grade, friable
iron ore resource accessible at Minas-Rio
Adjacency secured & studies ongoing
Brownfield Expansions / Mine Life
Extensions
QB-Collahuasi
Quelleveco
Antamina
Los Bronces Integrado
Selected Greenfield Developments
Galore Creek
Schaft Creek
NuevaUnión
NewRange
Sakatti
Woodsmith
9
MERGER OF EQUALS WILL DRIVE SIGNIFICANT VALUE
Strong EBITDA* growth from combined Anglo Teck
Highly capital efficient
incremental copper tonnes
Anglo
Teck
Anglo Teck EBITDA*
Corporate Synergies
Low capital growth through
optimization
Adjacencies incl.
QB/Collahuasi
and LB/Andina
Near-term Priorities
Merger subject to customary closing and regulatory conditions.
- EBITDA is a non-GAAP financial measure. See “Non-GAAP Financial Measures and Ratios” slide, illustrative bars not indicative of actual financial data
Future Growth Optionality
Anglo Teck Potential
Future Value
10
OPERATIONS
11
FOUNDATION OF WORLD-CLASS OPERATIONS
Critical minerals assets in established mining jurisdictions
Top 10 copper producer operating in the Americas1
Tier 1
Tier 1
1
1 2
Quebrada Blanca
Highland Valley
Potential to be a top 5
copper mine globally
Canada’s largest copper Top 10 global copper
mine, project underway mine1 with 1st quartile
to extend mine life
cost position
to 2046
60% ownership
100% ownership
Antamina
22.5% ownership
Carmen de Andacollo
90% ownership
Low strip ratio, reliable
copper producer
Largest net zinc miner globally
Tier 1
Copper Operations
1
2
3
4
Red Dog
100% ownership
Trail
100% ownership
Highland Valley
Antamina
Quebrada Blanca
Carmen de Andacollo
2
3
Zinc Operations
1
2
Red Dog
Trail Operations
4
Large, high-grade
One of the largest integrated
zinc mine with mine life polymetallic smelting and
extension potential
refining complexes
12
ATTRACTIVE PORTFOLIO OF OPERATIONS AND PROJECTS
Operations
1 2
Operating Assets
Brownfield Projects
Quebrada Blanca (QB)
QB Future Expansion
Antamina
Antamina Mine Life Extension
4
Copper Operations
1
2
3
4
Highland Valley
Highland Valley Mine Life Extension (Sanctioned)
Carmen de Andacollo (CdA)
CdA Mine Life Extension
Red Dog
Red Dog Mine Life Extension
1
2
4
5
Trail Critical Minerals Opportunities
3
1 2
5
Highland Valley
Antamina
Quebrada Blanca
Carmen de Andacollo
Copper Projects
3
Trail
3
6
2
Zafranal
San Nicolás
Galore Creek
Schaft Creek
NewRange
NuevaUnión
Projects
1
San Nicolás
NuevaUnión
Zafranal
Teena
Galore Creek
Cirque
2
1
3
Zinc Operations
Red Dog
Trail Operations
NewRange
1
Schaft Creek
Zinc Projects
2
1
2
3
6
4
Teena
Red Dog Mine Life Extension
Cirque
13
COST OF SALES
2025
Copper Cost of Sales1 (C$)
Transportation
5%
Zinc Cost of Sales1 (C$)
Royalties
1%
Depreciation & Amortization
29%
Depreciation & Amortization
10%
Operating Costs
65%
Transportation
11%
Operating Costs
38%
Royalties
15%
Raw Material Purchases
26%
Copper Operating Costs1 (%)
Zinc Operating Costs1 (%)
Labour
22%
Labour
35%
Contractors & Consultants
24%
Contractors & Consultants
11%
Operating Supplies & Parts
17%
Operating Supplies & Parts
14%
Repairs & Maintenance Parts
17%
Repairs & Maintenance Parts
10%
Energy and Others
20%
Energy
16%
Total
100%
Other Costs
14%
Total
100%
14
COLLECTIVE AGREEMENTS
Operation
Expiry Dates1
Highland Valley
September 30, 2026
Trail Operations
May 31, 2027
Antamina
July 31, 2027
Quebrada Blanca
January 31, 2028
March 31, 2028
November 30, 2028
Carmen de Andacollo
September 30, 2028
December 31, 2028
15
LATAM
OPERATIONS
16
QUEBRADA BLANCA
Tier 1, low-cost, long-life cornerstone asset
1
Iquique
Large deposit capable of supporting multiple expansions
2
High reserve grade and low strip ratio, significant resource expansion
over previous years, with further district-scale potential
3
At full capacity, QB is expected to generate strong cash flow,
due to lower costs, low sustaining capital and capitalized stripping
24
years
Current mine life
to 2050
0.53% 200-235kt
Copper
reserve grade1
2026 copper
production guidance2
Collahuasi
Santiago
QB
280M
$
2025 gross profit
before D&A*
120M
$
2025 gross profit
- Gross profit before depreciation and amortization (D&A) is a non-GAAP financial measure. See “Non-GAAP Financial Measures and Ratios” slides.
17
CODELCO INTEREST IN QUEBRADA BLANCA
• Chilean state-run miner Codelco purchased Enami’s 10%
-funding interest in Compañía Minera Teck Quebrada Blanca S.A.
(CMTQB) on September 5, 2024
Organizational Chart
Teck
• Codelco is not required to fund QB development costs
100%
• Project equity funding in form of 25% Series A Shares and 75%
Shareholder Loans
• Until shareholder loans are fully repaid, Codelco is entitled to a
minimum dividend, based on net income, that approximates
2.0-2.5% of free cash flow
‒ Thereafter, Codelco receives 10% of dividends / free cash flow
Codelco
SMM
SC
83.33%
16.67%
TRCL
Chile HoldCo
66.67%
33.33%
JVCo
10%
(Series B)
90%
(Series A)
CMTQB
100%
QB / QBME
QB1 / QB2
18
ANTAMINA
One of the largest copper and zinc mines in the world by production
1
Tier 1, high-grade copper-zinc deposit producing copper, zinc,
molybdenum, and lead concentrates
2
Low C1 costs due to high grade and zinc credits
3
Significant land position with both near and long-term expansion potential
10
years
Current mine life
to 2036
0.91%
Copper
reserve grade1
95-105kt
2026 copper
production guidance2 (22.5%)
Antamina
370M
$
2025 gross profit
before D&A*
297M
$
2025 gross profit
- Gross profit before depreciation and amortization (D&A) is a non-GAAP financial measure. See “Non-GAAP Financial Measures and Ratios” slides.
19
ANTAMINA MINE LIFE EXTENSION
Extension to 2036, with potential beyond
Tucush
Waste
Dump
Received regulatory approval to extend life of mine to 2036 in Q1 2024
• Maintains current production profile of well known, proven asset
Open Pit
Extension is a low-risk US$2B investment (Teck’s share: US$450M) over 8 years
to optimize and expand the existing facilities including:
Tailings
Facility
Crushing
and
Material
Transport
System
• A pit expansion with in-pit waste crushing and conveying systems to reduce
haulage demands as the pit deepens
• A 30m raise of the existing tailings dam to create additional tailings
management facility capacity
• New mining equipment and expanded truck shop
Opportunities to extend the mine life beyond 2036 are being studied
Mine Operation Area
East Waste
Dump
Illustrative Timeline
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
LE (LOM) Plan
Evaluation of Post-2036 Extension Options
20
CARMEN DE ANDACOLLO
Efficient operations
1
Stable production profile, reliable operation
2
Operational and cost improvements driving results
CdA
3
Cash generative asset
12
years
current mine life
to 2038
0.30%
Copper
reserve grade1
45-55kt
2026 copper
production guidance2 (100%)
142M
$
2025 gross profit
before D&A*
106M
$
2025 gross profit
- Gross profit before depreciation and amortization (D&A) is a non-GAAP financial measure. See “Non-GAAP Financial Measures and Ratios” slides.
21
NORTH
AMERICA
OPERATIONS
22
HIGHLAND VALLEY COPPER
Canada’s largest copper mine
1
Technology and Innovation underpins efficient, low-cost operations
2
Multiple pits and tailored flowsheet offers flexibility
HVC
3
Vancouver
Attractive, low risk, brownfield mine life extension
20
years
Including sanctioned
mine life extension to 2046
0.28% 115-135kt
Copper reserve grade
including sanctioned
mine life extension1
2026 copper
production guidance2
286M
$
2025 gross profit
before D&A*
223M
$
2025 gross profit
- Gross profit before depreciation and amortization (D&A) is a non-GAAP financial measure. See “Non-GAAP Financial Measures and Ratios” slides.
23
23
RED DOG OPERATIONS IS A TIER ONE ASSET
The largest zinc critical minerals mine in the US
Red Dog
1
One of the world’s largest zinc mines
2
Built on a world-class mining district
3
Potential to extend mine life beyond current operation
5
years
current mine life
to 2031
11.2%
Zinc
reserve grade2
375-415kt
2026 zinc
production guidance3
200M
$
2025 gross profit
before D&A*
138M
$
2025 gross profit
- Gross profit before depreciation and amortization (D&A) is a non-GAAP financial measure. See “Non-GAAP Financial Measures and Ratios” slides.
24
24
RED DOG SEASONALITY
Sales
Historical Zinc Sales and Lead Sales1 (%)
• Operates 12 months
Zinc
• Ships ~4 months
• ~65% of zinc sales in second half of year
Unit Costs
82%
27%
19%
18%
9%
• ~99% of lead sales in second half of year
• Sales seasonality causes net cash unit cost
seasonality
Lead
44%
Q1
Q2
Q3
Q4
0%
0%
Q1
Q2
Q3
Q4
Five-Year Historical Average Red Dog Net Cash Unit
Costs*,2 (US$/lb)
$0.60
$0.58
• Seasonality of Red Dog net cash unit costs largely
due to lead sales during the shipping season
$0.44
$0.27
Q1
- Net cash unit costs per pound is a non-GAAP ratio. See “Non-GAAP Financial Measures and Ratios” slides.
Q2
Q3
Q4
25
RED DOG MINE LIFE EXTENSION
High grade, large-scale underground mine leverages existing mill & infrastructure
Overview
Scope
Permitting
Attractive high-grade deposits
Leveraging existing infrastructure
Advancing the process
•
Anarraaq contains Inferred resources1
of 17.0 Mt @ 14.0% Zn, 4.0% Pb
•
Using existing Red Dog mill and
infrastructure
•
Aktigiruq contains Indicated resources1
of 42.2 Mt @ 15.8% Zn, 4.1% Pb and
Inferred of 18.8 Mt @ 11.8% Zn, 3.1% Pb
•
Surface resource drilling ongoing
─
Requires NEPA review and EIS
•
Prefeasibility study currently underway
─
•
Assessing development alternatives
Expect timeline to completion to be
~2.5 years under FAST-41
•
Expected to have 25+ years mine life,
producing >400ktpa1 of zinc
•
Relatively shallow underground mine
•
Specialty metals including high-grade
germanium
Illustrative Timeline
2025
Engineering and Permitting
2026
Construction
2027
•
Section 404 Permit application
submitted Aug. 2026
•
Teck-owned state mineral claims
converted to two Upland Mining Leases
in Jan. 2026
•
Working with NANA on a new operating
arrangement
Production
2028
Extension Studies
2029
Twin Decline Development
NEPA Process incl. Permitting
2030
2031
2032
Mine
Development
UG Production Commences
Potential quantity and grade of the Anarraaq exploration target is conceptual in nature. There has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource.
26
TRAIL OPERATIONS
Focus on generation of EBITDA and free cash flow
1
Produces refined zinc and lead, precious and specialty metals including germanium and
indium, chemicals and fertilizer products; potential expansion of germanium production
2
Strong strategic value, enabling vertical integration for the zinc segment
Trail
3
Decades of experience employing recycling processes and
new market opportunities emerging in critical minerals sector
Vancouver
27
27
COPPER
GROWTH
OPTIONS
28
PORTFOLIO OF VALUE-ACCRETIVE COPPER PROJECTS
Growth optionality focused in the Americas
North America
Latin America
Galore Creek
Cu-Au-Ag | Greenfield | British Columbia | 50% ownership
Large, high-quality open-pit
Cu-Au-Ag deposit
QB Optimization, Debottlenecking &
Future Growth Opportunities
Cu-Mo-Ag | Brownfield | Chile | 60% ownership
Tier 1 asset with multiple growth options
in the near- , medium-, and long-term
Schaft Creek
Zafranal
Large-scale, open-pit opportunity with
infrastructure synergies with Galore Creek
Permitted, medium-sized project with
elevated up-front production
Cu-Mo-Au-Ag | Greenfield | British Columbia | 75% ownership
Cu-Au | Greenfield | Peru | ~84.5% ownership
NewRange
San Nicolás
Two copper-nickel-PGM deposits with
the potential to become a large scale,
multi-generational asset
Permitted, low capital intensity and
strong returns expected
Cu-Ni-Co-Pd-Pt | Greenfield | Minnesota | 50% ownership
Cu-Zn Ag-Au | Greenfield | Mexico | 50% ownership
NuevaUnión
Cu-Mo-Ag and Cu-Au-Ag | Greenfield | Chile | 50% ownership
Large-scale open-pit opportunities with
extensive copper resource base
29
QB HAS POTENTIAL FOR MULTIPLE EXPANSIONS
Staged copper growth opportunities unlock significant incremental value
Optimization
Debottlenecking
QB/Collahuasi Adjacency
Future Growth Opportunities
• Target stable production of up to
~154 ktpd1 from 2029
• Implementation through 2028
• No additional permit required
• Target throughput of
~165-185 ktpd1
• Studies ongoing to identify
opportunities, as well as
post-merger approach
• DIA permit submission 2027
• Most value accretive expansion
opportunity
• Capital efficient growth US$11,000/t Cu capital intensity
• Current, permitted plan uses
<15% of defined reserves and
resources2
• Multiple configurations possible
30
QB’S R&R INCREASED SIGNIFICANTLY (60% OWNERSHIP)
Additional potential remains; district is prospective for Cu-Mo porphyry deposits
QB’s Historical Reserves and Resources and Grade1
Resource (Mt)
12,000
Reserve (Mt)
Reserve (CuT)
Mineral Reserves and Resources1
Resource (CuT)
Category
0.60%
Tonnes
Grade
Mt
Cu (%)
Mo (%)
Ag (g/t)
Proven
990.7
0.53
0.021
1.4
Probable
339.9
0.50
0.024
1.2
Total P&P
1,330.6
0.53
0.022
1.3
Measured
951.5
0.37
0.013
1.1
Indicated
3,580.9
0.38
0.018
1.2
Total M&I
4,532.4
0.38
0.016
1.2
Inferred
3,731.4
0.34
0.016
1.1
Reserves
10,000
0.50%
8,000
0.40%
6,000
4,000
0.30%
0.20%
2,000
0.10%
0
0.00%
Resources
31
ZAFRANAL PROJECT OVERVIEW1
Mid-sized copper-gold asset with robust economics and permit in place
Potential Long Life Asset in Peru
• Mine life extension opportunities through pit expansion and district
resource development
Quality Investment
• Attractive front-end grade profile for rapid payback
• Mid cost curve forecast LOM C1 cash costs
• Competitive capital intensity
Mining Jurisdiction
• Strong support from Peruvian regulators
• Engaged with all communities
• Building on >10 years of positive stakeholder engagement
Teck Ownership
Partner
Area
Project
~84.5% interest in
Compañía Minera
Zafranal (CMZ)
Mitsubishi Materials
Corporation (~15.5%)
Arequipa,
Southern Peru
Cu-Au porphyry
32
ZAFRANAL SITE LAYOUT
Good access to well-developed infrastructure at moderate altitude
• Mine: Copper-gold porphyry
open pit mine in Zafranal and
Victoria zones
View to West
• Mill: Nominal 65ktpd capacity
mill, concentrator and plant
facilities; conveyor tunnel
3.5km from mine
Port
TMF
Water
Mill + Mine
• Power: 96km, 220kV power line
from substation near Arequipa
to Zafranal site
Substation
220kV Power Line
20km
Existing roads
Main access road & water pipeline
Planned power line
Mine
Power line
Port
Mill
Water pipeline
Substation
• Sustainable Water Source:
Majes El Pedregal brackish
aquifer wellfield (50km from
mine), powered by 66kV power
line
Tailings facility
• Port: Port of Matarani, which
services major base metal
mines in the region
33
RESERVES AND RESOURCES AT ZAFRANAL (~84.5%)
Strong ore body knowledge to deliver on business plan
Geological Cross-Section1
Mineral Reserves and Resources1
Zafranal Main Zone – Central Long Section
A 150m wide section, looking 357 deg (North)
A’
195
Tonnes
Category
Leached/Oxide/Mixed
Grade
Mt
Cu (%)
Au (g/t)
Proven
408.8
0.39
0.07
Probable
32.0
0.21
0.05
Total P&P
440.7
0.38
0.07
Measured
5.1
0.19
0.04
Indicated
2.3
0.21
0.05
Total M&I
7.4
0.20
0.04
Inferred
62.8
0.24
0.10
Reserves
Resources
Cu%
195
Zafranal Main Zone Plan Map
28m @ 0.60% Cu,
0.17g/t Au from 304m
12m @ 0.69% Cu,
0.19g/t Au from 410m
Selected Production Metrics
500m
Cu Grade (%)
Y1
Y2
Y3
Y4
Y5
0.71
0.89
0.55
0.55
0.42
5Yrs Avg. LOM Avg.
0.58
0.36
34
SAN NICOLÁS PROJECT OVERVIEW
Unique and high-quality mid-sized base metal development asset
with high copper-zinc grades and low capital intensity
Potential Long Life Asset in Mexico
• Initial 15-year mine plan with multiple targets for mine life extension
• Excellent access and logistics for construction and operations
Quality Investment
• LOM C1 cash costs in the 1st quartile
• Highly competitive capital intensity
• Co-product Zn and by-product Au and Ag credits
Mining Jurisdiction
• Well-established mining district in Mexico
• Community engagement well established and positive
Teck Ownership
Joint Venture
Partner
Area
Project
50%
Agnico Eagle (AEM) (50%)
Zacatecas, Mexico
Cu-Zn, Ag-Au VHMS
35
SAN NICOLÁS - COMPACT SITE LAYOUT1
At moderate elevation in an established mining region; adjacent to infrastructure
General Site Layout and Access
• Mine: Conventional
open-pit mine and
concentrator operation;
strip ratio of 6:1
(waste:ore) expected
~ El 2,110 m
~ El 2,234 m
• Mill: Nominal 20ktpd1
plant producing copper
and zinc concentrate
• Water: Repurposed grey
water from Zacatecas
City, ~56km away
• Power: Evaluating
power supply options
• Community: Strong
support from
communities
1 Km
36
RESERVES AND RESOURCES AT SAN NICOLÁS (50%)
Mineral Reserves and Resources1
Well Defined Orebody1
NW
Category
Tonnes
Grade
Mt
Cu (%)
Zn (%)
Proven
47.7
1.26
1.6
Probable
57.5
1.01
1.4
Total P&P
105.2
1.12
1.5
Measured
0.5
1.35
0.4
Indicated
6.1
1.17
0.7
Total M&I
6.6
1.18
0.7
Inferred
4.9
0.94
0.6
Reserves
Resources
Measured
Indicated
Inferred
2020
Reserves Pit
250 m
37
NEWRANGE CU-NI-CO-PD-PT DEPOSITS (50%)
Responsible delivery of critical metals to support the energy transition
JV provides enhanced asset development path
• Our 50:50 joint venture (JV) with Glencore combines the NorthMet
and Sunrise (Mesaba) deposits in the established Iron Range region
of Minnesota under one management team and approach
• The partners complementary skillsets and relationships expected
to contribute to timely and successful development of NorthMet
and Sunrise
Two large copper-nickel-PGM assets
Mineral Resources1
Major source of critical metals in North America
Grades
Tonnes
(Mt)
Cu
(%)
Ni
(%)
Co
(%)
Pd
(g/t)
Measured
287.6
0.26
0.08
0.007
0.24
Indicated
353.4
0.25
0.07
0.007
0.23
Total M&I
641.0
0.25
0.08
0.007
0.23
Inferred
406.5
0.26
0.07
0.006
0.24
Resources
NORTHMET
SUNRISE
• At NorthMet, the JV plans to build and operate a
36,000 tonne-per-day mine and processing facility
Measured
459.6
0.39
0.09
0.009
0.11
Indicated
1,892.4
0.32
0.07
0.009
0.11
Total M&I
2,352.0
0.36
0.08
0.009
0.11
• Sunrise is one of the world’s largest undeveloped copper-nickelPGM deposits with potential for multi-generational production
Inferred
2,316.8
0.27
0.07
0.008
0.15
Defining a path to production
• Potential development optimization with existing infrastructure in
the area and region
Repurpose existing infrastructure
for processing facilities
38
GALORE CREEK CU-AU-AG PORPHYRY (50%)
Advancing a large, high-quality undeveloped Cu-Au-Ag deposit in NW BC
Quality investment and partnership
• The project is owned by the Galore Creek Partnership
(Teck:Newmont 50:50) and managed by Galore Creek Mining
Corporation (GCMC); located in Tahltan Territory ~370km NW of
Smithers, British Columbia
• Strong technical, commercial, and community expertise in GCMC
is enhanced with contributions from the Partners
Mineral Resources1
Grades
Resources
Tonnes
(Mt)
Cu
(%)
Au
(g/t)
Ag
(g/t)
Measured
425.7
0.44
0.29
4.1
Indicated
771.2
0.47
0.22
4.8
Total M&I
1,196.8
0.46
0.25
4.5
Inferred
237.8
0.26
0.19
2.6
Long-life asset
• Among the highest-grade undeveloped copper-gold porphyry
deposits in the world; significant resource expansion and
exploration upside potential
Clear path to value realization
• Prefeasibility study in progress
• Leverage existing camps and equipment to de-risk and shorten
development timeline
• Long-standing partnership with the Tahltan First Nation including
a supportive Participation Agreement
Exceptional discovery potential
in under-explored district
39
NUEVAUNIÓN CU-MO-AG AND CU-AU (50%)
Significant long-term opportunity in an expanding district
Leveraging synergies and expertise in a stable jurisdiction
• NuevaUnión is a 50:50 partnership between Teck and Newmont
that combines the Relincho Cu-Mo-Ag deposit the La Fortuna CuAu-Ag deposit, located ~40km apart in the established mining
jurisdiction of Huasco Province, Atacama region Chile
• Synergies include reduced environmental footprint, shared
infrastructure, lower relative costs, improved capital efficiency,
optimized mine plan, and enhanced community benefits
Long-life asset
• Strategic studies build on recent technical, social, and
environmental studies, to advance the best commercial
development strategy and phasing to preserve optionality
• Recent activities focused on optimization of alternate development
configurations to lower initial capital, underpinned by the large,
high quality resource base to provide long-term optionality and
possible extension
Mineral Reserves and Resources1
Grades
RELINCHO
Reserves
Proven
Probable
Total P&P
Resources
Measured
Indicated
Total M&I
Inferred
LA FORTUNA
Reserves
Proven
Probable
Total P&P
Resources
Measured
Indicated
Total M&I
Inferred
Tonnes
(Mt)
Cu
(%)
Mo
(%)
Au
(g/t)
Ag
(g/t)
576.4
977.4
1,553.8
0.34
0.36
0.35
0.014
0.017
0.016
1.6
1.5
1.5
319.0
463.0
782.0
724.7
0.19
0.26
0.23
0.36
0.006
0.009
0.008
0.012
1.0
1.2
1.1
1.3
386.8
295.4
682.2
0.58
0.42
0.51
0.55
0.36
0.47
0.9
0.7
0.8
9.6
236.7
246.3
479.7
0.42
0.51
0.51
0.43
0.47
0.59
0.59
0.40
0.9
1.1
1.1
1.0
• Kicked off a Prefeasibility Study in Q4 2026 focused on Relincho
Relincho deposit area.
40
SCHAFT CREEK CU-MO-AU-AG PORPHYRY (75%)
Large-scale, open-pit development opportunity
Large-scale resource in a mining-friendly jurisdiction
• Schaft Creek is a joint venture between Teck (75%) and Copper Fox
Metals Inc. (25%), with Teck as operator
Mineral Resources1
Grades
Resources
Tonnes
(Mt)
Cu
(%)
Mo
(%)
Au
(g/t)
Ag
(g/t)
• Located in Tahltan Territory ~61km south of Telegraph Creek and 37
km northeast of Galore Creek
Measured
166.0
0.32
0.021
0.20
1.5
Indicated
1,127.2
0.25
0.016
0.15
1.2
Long-life asset
Total M&I
1,293.2
0.26
0.017
0.16
1.2
Inferred
316.7
0.19
0.019
0.14
1.1
• 1,293 Mt measured and indicated resources supports long mine
life (>20 years) with the potential for expansion and improved
development economics2
Condensed footprint and cost-effective development
• Teck led scoping study completed in 2020 (subsequently published
as a PEA by Copper Fox in 2021); stronger investment case than
previous studies with reduced strip ratio and optimized
infrastructure layout
• Planned field work includes expanded environmental baseline,
focused geotechnical investigations, and facilities siting work
Cu-Mo-Au-Ag porphyry deposit
of scale in Tahltan Territory
41
ZINC
DEVELOPMENT
OPTIONS
42
PORTFOLIO OF ZINC DEVELOPMENT OPTIONS
High-quality portfolio of zinc development assets
1
Red Dog District
Prefeasibility study in progress for the following two deposits:
Anarraaq (Zn-Pb), USA Teck 100%
~11 km from operation
Inferred Resources1,2 of 17.0 Mt @ 14.0% Zn, 4.0% Pb
Aktigiruq (Zn-Pb), USA Teck 100%
~14 km from Red Dog operation
Mineral Resources1,2
• Indicated Resources of 42.2 Mt @ 15.8% Zn, 4.1% Pb
• Inferred Resources of 18.8 Mt @ 11.8% Zn, 3.1% Pb
Su-Lik (Zn-Pb), USA Su: Teck 100%, Lik: Teck 50% | Solitario Zinc Corporation 50%
~17 km from Red Dog operation; leveraging historical work
2
Cirque District
North America
1
2
Trail
Australia
Cirque (Zn-Pb), Canada Teck 50% | Korea Zinc 50%
In north-eastern British Columbia and proximal to existing infrastructure
Drilling program underway to confirm historical data
3
Sullivan Mine
3
McArthur River Mine
McArthur District – Teena District
Teena (Zn-Pb), Australia Teck 100%
~7 km from Glencore’s McArthur River operation; conceptual study in progress
Inferred Resource1,3 of 58 Mt @ 11.1% Zn, 1.6% Pb
Zinc belt
43
ZINC DEVELOPMENT OPTIONS
Adding value to our high-quality portfolio of zinc development assets
Largest Undeveloped Zinc Deposits1
Bar height = Size of the deposit
= Estimated grade, Teck | Other projects
= >10% Zn+Pb
• Long-term demand outlook for zinc is strong, driven by
decarbonization which is galvanized steel intensive
Teck’s world-class zinc business
• Teck is the largest net zinc miner in the world, with a large scale,
low-cost, integrated business and attractive portfolio of
development opportunities
• Long, sustained history of exploration in premier zinc districts
Contained Zn + Pb (Mt)
• Declining production from existing primary zinc mines;
underinvestment in global exploration for primary zinc deposits
35
35%
30
30%
25
25%
20
20%
15
15%
10
10%
5
5%
0
0%
Grade Zn + Pb (%)
Zinc outperforms market expectations
Path to value
• Leveraging copper growth experience to surface value from high
quality portfolio of zinc opportunities over the next decade
• Prudent investment to further expand our understanding of each
assets' potential and associated development options
• Define commercial path to value for each project, either as
a standalone investment, partnership or through monetization
Teck has several high-grade zinc assets
in favourable low-risk jurisdictions1,2
44
MACRO AND
METALS
OUTLOOK
45
ECONOMIC ACTIVITY REMAINS RESILIENT AND EXPANSIONARY
Global economic growth has outperformed expectations for almost two years
Citi Economic Surprise Index1
OECD Composite Leading Indicator2
100
102
India
101
50
G7
Asia Pacific
US
World
Emerging Markets
100
0
99
-50
01/01/2025
01/07/2025
01/01/2026
01/07/2026
Above 0 indicates actual economic data is, on balance, exceeding market expectations.
01/01/2023
01/01/2024
01/01/2025
01/01/2026
01/01/2027
100 = long-term trend in economic activity; above/below indicates relative position to trend.
46
THE MACRO BACKDROP REMAINS SUPPORTIVE FOR COMMODITIES
Accelerating physical demand is converging with the rotation into real assets
S&P Global Manufacturing PMIs1
BCOM Open Interest2 (contracts)
60
240,000
US
56
India
Japan
180,000
Germany
52
China
50
120,000
48
60,000
44
0
01/04/2024
01/11/2024
01/06/2025
01/01/2026
A reading above 50 signals expanding manufacturing activity.
01/08/2026
0
06/01/2015
15/09/2020
29/09/2026
100 = long-term trend in economic activity; above/below indicates relative position to trend.
47
INDUSTRIAL ACTIVITY IS DRIVING CHINA’S ECONOMIC GROWTH
Electrification and manufacturing are bright spots for metal demand
Selected China Metrics1 (% change September YTD year-over-year)
Property
Investment
Fixed Asset
Investment
Electricity
Production
Industrial
Production
Electricity
New Energy
Consumption Autos Production
Solar Power
Output
Exports
(USD terms)
Industrial
Profits (Aug YTD)
Integrated
Circuits
Production
Industrial
Robots
Production
29.1
23.2
21.3
12.0
2.2
5.3
12.9
15.7
4.3
-7.2
-20.6
•
Energy infrastructure and manufacturing continue to offset property weakness, with commodity demand supported through resilient exports, global AI
investment and continued policy support for high-tech sectors and advanced manufacturing
•
China’s RMB 7 trillion Six Networks programme aims to strengthen infrastructure and support economic growth, with investment in power grids helping to meet
rising electricity demand and expand transmission capacity, providing further upside for copper demand
•
Longer term, 15th Five-Year Plan priorities centered around clean energy, electrification and industrial upgrading reinforce support for high-tech manufacturing,
electrification and grid investment, underpinning a strong structural outlook for copper demand
48
GLOBAL ELECTRIFICATION IS ACCELERATING, LED BY CHINA
Global solar generation saw record growth in 2025, while coal declined
Global Electricity Generation by Fuel1
(Annual change, TWh)
30
6
51
Electricity Share of Energy Supply1
(%)
24
8
An additional 7,150 TWh of electricity generation is
needed for the world just to match China’s current mix
20
861
China
World
India
United States
Germany
32,202
16
31,347
2024
Renewables Nuclear
Hydro
Fossil
Other
2025
0
2000
2005
2010
2015
2020
2025
•
The global energy transition is accelerating as emerging economies increasingly adopt an electrostate model; China added 488.4 TWh of electricity generation in
2025, more than the rest of the world combined, and now accounts for one-third of global generation
•
Global renewable generation grew 9% in 2025 as solar output surged 30%, while global coal generation declined 0.3%; China contributed 35.6% of global
renewable supply and low carbon sources now account for over 40% of China’s electricity mix
49
ECONOMIC GROWTH IS DECOUPLING FROM FOSSIL FUELS
Emerging markets are following a less coal-intensive growth path
India & China Wind & Solar Capacity1
India & China Coal Capacity1
kWh per capita
kWh per capita
2,000
5,000
India Electricity Generation
by Fuel 20252 (% change Y/Y)
30
27
China 2025
China 2025
23
4,000
1,500
20
3,000
1,000
10
2,000
500
1,000
India 2025
0
India 2025
0
-3
0
0
10,000
20,000
30,000
GDP per capita
(PPP, current prices)
0
10,000
20,000
30,000
GDP per capita
(PPP, current prices)
-10
Coal
Solar
Wind
50
LED BY INDIA, EMERGING ASIA HAS HUGE GROWTH POTENTIAL
Infrastructure and manufacturing growth will be highly metal-intensive
Selected India Metrics1 (% change Y/Y)
Jan-26
Total Copper Consumption per Capita2 (kg)
2025
Feb-26
2050 Modelled
27.4
26.6
20.3
5.1
5.2
Industrial Production
5.6
5.3
6.0
Manufacturing Output
India
14.6
Infrastructure Output
6.2
3.0
1.3
1.0
11.9
6.5
Indonesia
Vietnam
Malaysia
Thailand
Total Zinc Consumption per Capita2 (kg)
11.2
6.0
Electricity Output
5.1
2.3
1.7
•
India’s central government budget for financial year 2026-27 focuses on
infrastructure and manufacturing investment, with total expenditure of
~$583B. Metal-intensive infrastructure capex should expand 11% to $133B
2.9
2.8
2.5
0.6
0.4
India
Indonesia
1.6
Vietnam
1.3
Malaysia
1.7
Thailand
51
SHORT-TERM COPPER MARKET FUNDAMENTALS
Concentrate tightness changing miner-smelter economics
4%
2%
0%
-2%
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Spot Treatment Charges Now Extremely Negative2
(US$/dmt)
Spot
Benchmark
Jan-26
Jul-25
Jan-25
Jul-24
Jan-24
Jul-23
Jan-23
Jul-22
Jan-22
Jul-21
Jan-21
Jul-20
Jan-20
Jul-19
Jan-19
150
100
50
0
-50
-100
-150
-200
Jul-18
• This change in economics necessitates a change to
traditional pricing drivers, and a shift towards greater
sophistication in concentrate terms
6%
Jan-18
• Tightness is reflected in extremely negative treatment
and refining charges, which have continued to trend
lower
8%
Jul-17
− Some new smelters are linked to incumbent
concentrate export mines, reducing supply to the
custom market
Smelter Capacity Growth
10%
Jan-17
− With few major concentrate projects in the pipeline,
the concentrate deficit is anticipated to take several
years to normalize
Mined Growth
Jul-16
• Smelter capacity growth is set to outpace mined
production growth in 2027, a fifth consecutive year
Global Conc Production and Smelter Capacity Growth1
(growth %)
Jan-16
• The global copper concentrate market is experiencing a
period of acute tightness
52
LONG-TERM COPPER MARKET FUNDAMENTALS
Supply remains constrained; electrification still drives global growth
− Energy shock has underscored economic and
security resilience imperative of green buildout
• Expect a more electricity-intensive phase of global
growth in the coming years
− Investment in grid infrastructure to support the
digital economy, energy transition and rapid
urbanization
• Investment in copper concentrate supply hasn’t
matched demand; without permanent closures,
smelter utilization rates likely to remain low
• A capital stock of copper is required to make progress
on climate targets and reshoring of manufacturing and
processing capacity
Long Term Demand Growth, Copper vs. Electricity1
(kt copper)
10000
Electricity (RHS)
20000
Copper (LHS)
8000
15000
6000
10000
4000
TWh
• Copper is the linchpin of global electrification, as the
most effective way to move electrons around
5000
2000
0
0
1950s
1960s
1970s
1980s
1990s
2000s
2010s
2020s
2030s
Global Concentrate Balance2 (kt Cu)
500
Benchmark
CRU
0
-500
-1,000
-1,500
-2,000
-2,500
-3,000
2025
2026
2027
2028
2029
2030
53
SHORT-TERM ZINC MARKET FUNDAMENTALS
Not enough concentrate available to meet smelter needs
• Global zinc inventories (concentrate and metal) are
extremely low relative to historical norms
− Falling spot treatment charges highlight the lack of
concentrate availability
• 2026 is being characterized by falling supply from large
Western mines; expect little to no global mine supply
growth in 2026
− Multiple downgrades to mine supply since start of
2026 adds further downward pressure to concentrate
market
• Despite low TC backdrop, smelter economics remain
supported by rising metal prices and by-product credits,
discouraging shutdown
Treatment Charges Remain Low in Historical Terms1
(US$/t)
Annual Settlement
Spot TC
2020
2023
$400
$300
$200
$100
$0
($100)
($200)
2017
2018
2019
2021
2022
2024
2025
2026
54
LONG-TERM ZINC MARKET FUNDAMENTALS
Zinc concentrate constrained by supply growth
• Mine supply growing just +2.6% by 2030
─ Ex-China growth lagging, just +1.6% by 2030
─ China’s smelters will continue to compete for
imported feeds
• Smelter capacity still outpacing that increase
─ Expected to grow +15% by 2030
Mine production growth is essentially stagnant1 (kt)
15,000
12,000
9,000
6,000
3,000
─ 1 Mt shortfall in concentrate
• Zinc concentrate market tight, as smelters return and
mine supply growth remains low
─ To 2030: 3.0 Mt of growth is offset by 2.0 Mt of
depletion; smelter capacity rising by 2.5 Mt
• Concentrate tightness expected to persist with new
mines facing delays
• Latest price spike and low-TC environment has not
materially brought new zinc projects forward
Global Zinc Smelter Growth2 (kt, average increase)
Ex-China
350
300
250
200
150
100
50
0
2023
2024
China
2025
2026
55
COPPER
MARKET
56
COPPER OUTLOOK
Limited mine production paired with sizeable smelter capacity growth;
escalating trade tensions increasing risks in coming years
• Concentrate market is expected to
remain undersupplied moving
forward until significant new mine
production ramps-up
• Mine production has the potential to
peak in 2029, later and lower than
previously forecast
• Slower post-disruption production at
major assets in DRC and Indonesia
removes near-term tonnage
• Operating costs and capital
spending expected to rise in 2026
• Growth of primary smelter capacity
pushed 2026 TC/RC benchmark to
all-time low
• Smelter capacity increases from
commissioning in China, India,
Indonesia and Africa
• Ramp up of new integrated smelters
in locations like DRC and Indonesia
is reducing concentrate volume
available to the custom market
• Smelter production significantly
outpaced mined concentrate
growth in recent years, and is
expected to outpace again in 2027
• Scrap usage growing, with smelters
looking to boost scrap ratio
• Demand growth expected to remain
at 1.5-2.0% in 2026, increasing
downside risk due to geopolitical
issues and trade wars
• Chinese purchasing has resumed,
despite historically higher prices,
spurred by domestic grid spending
and higher exports
• Substantial uncertainty around US
trade policy and retaliation
• Increasing nationalism, slowing
energy transition, and collapse of
Chinese property sector could
seriously impact future copper
demand
• Despite much-publicized policy
headwinds, decarbonization-related
growth continues to accelerate
• Energy transition expected to
account for most copper demand
growth out to 2050
• China’s electrostate model, with
increased wind capacity
installation, EV production and grid
construction, is expected to be
rolled out to other Global South
countries
• Thrifting and substitution could
negatively impact copper demand
growth in the fuel to materials
transition, but recent concerns over
security of aluminum supply chains
are lowering this risk
57
CONCENTRATE TIGHT, CATHODE MARKET IN SLIGHT SURPLUS
High exchange inventories, but most COMEX/LME stocks ‘locked’ in US
• Lack of concentrate availability continues to constrain
smelter output
Global Concentrate Balance1 (kt Cu)
500
Benchmark
CRU
• US stockpiling continues, with 83% of exchange stocks
in US warehouses
− SHFE stocks are at multi-year lows at end of Q3
0
-500
-1,000
-1,500
• Cathode supply is in slight surplus, but much of this
cathode is unavailable to marginal buyers
-2,000
-2,500
-3,000
2025
2026
2027
2028
2029
2030
Global Exchange Refined Cathode Stocks3 (kt)
Refined Global Cathode Balance2 (kt Cu)
1,400
1,500
1,000
Benchmark
1,200
CRU
800
1,000
600
400
500
200
2025
2026
2027
2028
2029
2030
SHFE
Jul 2026
Sep 2026
Mar 2026
May 2026
Jan 2026
Nov 2025
Sep 2025
Jul 2025
May 2025
Jan 2025
USA LME
Mar 2025
Nov 2024
Jul 2024
COMEX
Sep 2024
Mar 2024
May 2024
Jan 2024
Nov 2023
Sep 2023
Jul 2023
May 2023
Jan 2023
-500
Mar 2023
0
0
Ex-USA LME
58
THE COPPER CONCENTRATE MARKET HAS CHANGED MARKEDLY
Some of the past year’s changes are transient, others are more secular
Fastest mined copper growth
in DRC, but mainly in SXEW
cathode rather than concentrate
Spot TCs have hit record lows,
dropping below US$220/t,
and very far away from
US$0/t benchmark
Clear divergence between
spot TCs to smelters and traders,
both continuing to trend lower
Global smelter utilization <75%;
projected to remain low
Annualized smelter capacity
additions expected to outpace
mined concentrate growth in
2027, for a 5th consecutive year
Trade related cathode market
distortions impacting availability
of cathode to marginal buyer
Government interest in
copper rising, as it is added
to critical mineral lists
Entry of new merchant traders
seeking copper concentrate
Many copper by-products
trading at or close to record highs,
supporting smelter revenues
59
AMID A LACK OF CONCENTRATE, SMELTER UTILIZATION DROPS
Large deficits peak in 2029, lower utilizations below historical norms to 2030E
• Benchmark reports the theoretical concentrate deficit
(between smelter target and available concentrate) has
grown to 1.1 Mt Cu in 2026
─ Deficit expected to expand out to 2029, and remain
substantial into early 2030s
• Following major drop in 2025, smelter utilization hit
record lows in 2026; benchmark expects nadir in 2027
─ Higher byproduct prices have increased smelter
revenue per tonne of feed. This increased revenue per
tonne, alongside the growing concentrate deficit,
could result in sustained low-capacity utilization
─ Improving smelter economics with rising by-product
prices means no economic incentive to close
─ No quick fix with smelters hard to close, limited
concentrate coming online
Global Concentrate Balance1 (kt Cu)
500
Benchmark
CRU
2027
2028
0
-500
-1,000
-1,500
-2,000
-2,500
-3,000
2025
2026
2029
2030
Smelter Capacity Utilization2 (%)
85%
80%
75%
70%
65%
60%
2020
2021
2022
2023
2024
Benchmark
2025
2026
2027
2028
2029
2030
WoodMac
60
COPPER MINE PROJECT OUTLOOK
Multiple fundamentals negatively impacting future mine production
• Copper ore grades have been declining for years, with
the trend not expected to reverse — lower grades require
higher quantity of ore to maintain production levels,
increasing costs
• Investment focused on optimizing existing mines and
M&A to secure/expand copper portfolio, as opposed to
focusing on new additional mine production —
investors remain cautious about building new mines
• Rising costs have pushed long-term incentive prices
higher, current prices not incentivizing projects
• Average capital intensity expected to be ~30% higher for
projects slated for development between 2030-2040,
compared to 2010-2023 levels
Weighted Average Ore Grades1 (%)
Hundreds
• Declining ore grades, escalating costs, slow permitting,
and underinvestment continues to negatively impact
new mine production, prolonging the concentrate
market deficit
1.00%
Ore Grade
Forecast
0.90%
0.80%
0.70%
0.60%
0.50%
0.40%
Benchmark Unconstrained Supply Outlook (kt Cu)2
30,000
25,000
20,000
15,000
10,000
5,000
0
2025
2026
2027
Operating
2028
2029
2030
Projects (unadjusted)
61
CHINESE SULPHUR MARKET REMAINS TIGHT, ACID PRICES HIGH
Hormuz crossings below pre-war levels, providing revenue boost to smelters
Chinese Sulphur Imports1 (kt)
Smelter Acid Revenue2 (RMB/t Cu)
2,000
1,200
1,500
1,000
1,000
500
800
0
600
Hormuz Crossings3 (vessels/month)
400
900
200
800
700
600
0
500
400
300
200
Other
India
Japan/Korea
UAE
Oman
Inside Gulf (Saudi, Kuwait, Qatar, Iran, Iraq, Bahrain)
100
0
Jan
Feb
March
April
May
June
July
Aug
Sept
62
CHINA COPPER DEMAND DRIVEN BY UTILITIES AND EV’S
Chinese copper demand expected to keep growing ~4% in 2027
Chinese Copper Demand by Sector1 (kt)
Transport
Machinery
Utility
Construction
• Chinese copper demand growth has averaged 3.0%
CAGR since 2023, spurred by NEV production, export
demand and power grid investment
Other
20,000
• Copper demand growing 2% this year, despite higher
prices, and set to grow 4% next year, driven by:
18,000
16,000
−
Grid buildout, with 5 trillion RMB committed during
the 15th Five Year Plan (2026-2030)
−
Green energy infrastructure through investment in
renewable power, charging station and EV production
−
National push into expanding high tech
manufacturing sector and technological export driven
growth
14,000
12,000
10,000
8,000
6,000
• Risk of potential economic slowdown due to escalating
trade tensions, continuing decline of real estate sector,
increasing copper prices limiting downstream
purchases and increasing chances of substitution
4,000
2,000
0
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
63
INDIA COPPER MARKET
By 2050, India is projected to be the world’s third-largest economy
Indian Copper Market Outlook1 (kt)
Indian Copper Concentrate Indian Copper Cathode
Imports2
Imports3
1,600
Consumption
1,500
1,400
Mined Production
Chile
Peru
Total Refined Supply
Australia
Indonesia
Canada
Other
2025 Total: 1,436 kt
1,300
Japan
Tanzania
South Africa
Other
2025 Total: 238 kt
+6.5%
1,200
16.9%
1,100
1,000
4.2%
900
7.0%
800
3.4%
3.7%
42.8%
84.8%
13.1%
700
8.1%
16.1%
600
500
400
300
200
100
0
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
•
Indian copper demand expected to grow 6.2% in 2026 and a further 6.5% in
2027
•
Copper usage is expected to be driven by infrastructure development and
green energy transition, through renewable energy and EV adoption
•
Policy initiatives such as industrial corridors, the 'Housing for All' program,
national highway development projects, and the energy transition are key
drivers of this growth
64
COPPER SCRAP IS PART OF THE LONG-TERM SOLUTION
Scrap supplementing tight concentrate market
• Demand for scrap will escalate over the next decade
‒ End users increasingly want higher recycled content
• Copper scrap makes up 35% of total copper supply,
expected to rise to 40% by 2035
‒ Trade flows likely to change due to growth in
secondary projects in North America, Europe, India,
South Korea and Japan
• Chinese smelters’ dependency on scrap increasing in
short term to make up for insufficient concentrate feed
‒ Support from governments is crucial to accelerate
copper recycling, but national criticality is impacting
trade flows
‒ Chinese refineries also increasing scrap usage to
boost anode production
Tight Concentrate Supply Increasing Chinese Scrap Use1
Scraps Used by Smelters
Scraps Used by Fabricators
100%
80%
55%
60%
60%
40%
45%
20%
40%
0%
Blister and Anode Production from Scrap 2 (kt Cu)
Blister
Anode
6,000
5,000
4,000
3,000
2,000
1,000
0
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
65
TOTAL COPPER DEMAND TO GROW ON ECONOMIC DEVELOPMENT
Growth of traditional demand from urbanization and expansion of mid class
• CRU expects total copper demand to grow 3.2% CAGR