SSR Mining Inc. is a mining company focused on the operation, development, exploration, and acquisition of precious metal projects. The company operates four mines: the Marigold mine in Nevada, USA; the CC&V mine in Colorado, USA; the Seabee mine in Saskatchewan, Canada; and the Puna mine in Jujuy, Argentina. These assets are located in prolific precious metal districts, including the Battle Mountain-Eureka trend, the Cripple Creek Mining District, the Trans-Hudson Corridor, and the Bolivian silver belt. SSR Mining utilizes open pit and underground mining methods along with pressure oxidation, heap leach, and flotation processing. The company is the third-largest gold producer in the United States and holds district-scale land packages across its operating regions.

Summarised from the company's own disclosures, fiscal year ended Oct 2026

Industry Gold Homepage ssrmining.com
Sector Basic Materials IR page ir.ssrmining.com/investors/default.aspx
Tags
gold mining, silver mining, precious metals, open pit mining, underground mining, pressure oxidation, heap leach, flotation, Marigold mine, CC&V mine, Seabee mine, Puna mine
Press page ir.ssrmining.com/investors/news/default.aspx

Metrics

Valuation  
Market cap —
Market cap (USD) —
P/E —
PEG —
P/BV —
P/S —
P/OCF —
P/FCF —
Dividend yield —
Turnover / mcap —
Returns  
ROE 9.6%
ROI 9.2%
ROIC 9.2%
Profit margin 24.3%
Growth  
Revenue growing Yes
Profits growing Yes
Revenue up 3y No
Revenue up 5y No
Earnings growth 3y (net profit CAGR) 26.8%
Quality  
Profitable Yes
Margin expanding Yes
Buying back stock —
Diluting (TTM) —
Debt/Equity —
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 50
Quality score 58.3%
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021 FY 2020 FY 2019 FY 2018 FY 2017 FY 2016 FY 2015 FY 2014 FY 2013 FY 2012 FY 2011 FY 2010 FY 2009
Revenue 1.603B 987M 1.415B 1.148B 1.474B 853.089M 606.85M 420.675M 448.773M 490.986M 375.322M 300.122M 174.686M 241.12M 147.845M 112.256M —
Net profit 395.754M -261.277M -98.007M 194.14M 368.076M 133.494M 57.315M 6.379M 69.316M 64.957M — — -224.997M 54.826M 80.128M 346.239M —
Free cash flow 241.649M -103.404M 198.303M 23.381M 444.176M 179.275M -1.57M -7.978M 115.828M 128.412M 36.829M — — — -23.376M — —

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021 FY 2020 FY 2019 FY 2018 FY 2017 FY 2016 FY 2015 FY 2014 FY 2013 FY 2012 FY 2011 FY 2010 FY 2009
Share price 21.92 6.96 10.76 15.67 17.7 20.11 19.26 12.09 8.79 — — — — — — — —
Price performance 12m 2.15 -0.35 -0.31 -0.11 -0.12 0.04 0.59 0.38 — — — — — — — — —

Filed figures

Figure Dec 2015 Dec 2016 Dec 2018 Dec 2019 Dec 2020 Dec 2021 Dec 2022 Dec 2023 Dec 2024 Dec 2025
Balance sheet detail
Trade receivables (USD) — — — — 38.5M 86.1M 62.6M 91.3M 84.2M 94M
↳ YoY growth +124.0% -27.4% +46.0% -7.8% +11.6%
↳ 5y CAGR +19.6%
Borrowings, current (USD) — — — — 71M 71.5M 71.8M 920,000 11M 230M
Borrowings, non-current (USD) — — — — 367M 295M 227M 228M — 51.4M
Lease liabilities (USD) — — — — 123M 126M 125M 113M 107M 103M
Cash and deposits (USD) 212M 327M 421M 504M 861M 1.02B 655M 492M 388M 535M
Right-of-use assets (USD) — — — — 9.36M 7.53M 17.9M 21M 18.5M 16.9M
Net debt (borrowings + leases - cash) (USD) — — — — -300M -524M -232M -151M -289M -240M
Cash flow detail
Operating cash flow (USD) 74.1M 171M — 118M 307M 609M 161M 422M 40.1M 472M
Purchases of property, plant and equipment (USD) -37.3M -42.3M — -111M -139M -165M -138M -223M -144M -230M
Change in inventories (cash effect) (USD) — — — -11.4M -21.7M -20.8M -108M -33.3M -80.3M -148M
Change in payables (cash effect) (USD) — — — 16.7M 7.76M -6.88M 40.8M -41.9M -6.49M -1.05M
Dividends paid (cash effect) (USD) — — — 0.00 0.00 -43.2M -58.8M -57.7M 0.00 0.00
Share buybacks (cash effect) (USD) — — — 0.00 0.00 -148M -100M -56.3M -9.83M 0.00
Interest paid (cash effect) (USD) -9.04M -8.09M — -11.6M -13.6M -12.5M -22.6M -16.5M -7.43M -9.04M
Income taxes paid (cash effect) (USD) 6.69M -18.6M — -20.9M -43.7M -58M -146M -33.6M -25.5M -101M
Share-based compensation (USD) — — — 14.4M 15.9M 14.8M 6.47M 5.17M 4.72M 44.6M
Free cash flow (OCF - PPE - intangibles) (USD) 36.8M 128M — 7.52M 168M 444M 23.4M 198M -103M 242M
Reported Mar 30, 2016 Mar 23, 2017 Feb 23, 2022 Feb 23, 2022 Feb 23, 2022 Feb 23, 2022 Feb 22, 2023 Feb 27, 2024 May 6, 2025 May 5, 2026

Operating KPIs — quarters

KPI Dec 24 Mar 25 Jun 25 Sep 25 Dec 25 Mar 26 Jun 26 Sep 26
Gold production (oz) 59,702 75,869 90,966 75,212 91,031 82,314 75,601 76,651
↳ YoY growth -27.9% -5.5% +114.5% +19.1% +52.5% +8.5% -16.9% +1.9%
All-in sustaining cost (USD) 1,638 1,765 1,977 1,840 2,089 2,365 3,044 2,714
↳ YoY growth +12.2% -4.3% +0.7% +27.5% +34.0% +54.0% +47.5%
Reported Feb 17, 2026 — — — Feb 17, 2026 May 5, 2026 Aug 4, 2026 Nov 3, 2026

Operating KPIs — years

KPI Dec 2020 Dec 2021 Dec 2022 Dec 2023 Dec 2024 Dec 2025
Gold production (oz) 234,443 — 522,159 — 275,013 333,078
↳ YoY growth -29.5% +21.1%
All-in sustaining cost (USD) 1,222 713 1,328 1,433 3,814 1,918
↳ YoY growth +18.2% -41.7% +86.3% +7.9% +166.2% -49.7%
Reported Feb 17, 2021 — — — — Feb 17, 2026

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

SSR MINING REPORTS THIRD QUARTER 2026 RESULTS Bull 5 Bear 0 Results

DENVER - SSR Mining Inc. (Nasdaq/TSX: SSRM) ("SSR Mining" or the “Company") reports consolidated financial results for the third quarter ended September 30, 2026. In addition, the Board of Directors declared a quarterly cash dividend of $0.03 per common share payable on December 11, 2026, to holders of record at the close of business on November 13, 2026. This dividend qualifies as an 'eligible dividend' for Canadian tax purposes.

•Consolidated operating results from continuing operations: Third quarter 2026 production was 103,585 gold equivalent ounces at consolidated cost of sales of $1,755 per payable ounce and all-in sustaining costs (“AISC”) of $2,527 per payable ounce.(1,2) In the first nine months of 2026, the Company produced 315,459 gold equivalent ounces at consolidated cost of sales of $1,751 per payable ounce and AISC of $2,523 per payable ounce. Year-to-date results remain aligned with full-year 2026 production guidance of 450,000 to 535,000 gold equivalent ounces and the Company’s expectations of strong fourth quarter results.

SSR MINING ANNOUNCES 20-YEAR LIFE OF MINE PLAN FOR MARIGOLD

BASED ON EXPANDED 4.6 MILLION OUNCE MINERAL RESERVE

• NPV

5%

OF $3.3 BILLION AND $3.8 BILLION AT CONSENSUS AND SPOT PRICES, RESPECTIVELY

• MARIGOLD AVERAGES ANNUAL PRODUCTION OF 231,000 OUNCES OF GOLD FROM 2027 TO 2031

• LIFE OF MINE GOLD PRODUCTION TOTALS 3.3 MILLION OUNCES AT AN AVERAGE ALL-IN SUSTAINING COST (“AISC”) OF $2,062 PER

OUNCE SOLD

(1, 2)

• SSR MINING’S U.S. PORTFOLIO NOW ANCHORED BY TWO MULTI-DECADE ASSETS IN MARIGOLD AND CC&V HOSTING TOTAL

COMBINED GOLD MINERAL RESERVES OF 7.3 MILLION OUNCES, WITH AN ADDITIONAL 6.5 MILLION OUNCES OF M&I RESOURCES

AND 2.3 MILLION OUNCES INFERRED

DENVER – SSR Mining Inc. (Nasdaq/TSX: SSRM) (“SSR Mining”, the “Company”, “we”, “us”, or “our”) announces the

results of a Technical Report Summary (“TRS”) for the Marigold Gold Complex (“Marigold”) in Nevada, USA (the “2026

Marigold TRS”).

Highlights of the 2026 Marigold TRS:

( 1,2)

• After-tax NPV

5%

of $3.3 billion at consensus gold prices averaging $3,948 per ounce over the 20-year life of mine

• Average annual gold production of 231,000 ounces over the five-year period from 2027 to 2031, 201,000 ounces

through 2040, and 169,000 ounces over the life of mine

o Over the period of active mining, annual after-tax operating cash flow and after-tax free cash flow averages $354

million and $273 million, respectively, based on consensus gold prices

• Gold Mineral Reserves at Marigold total 4.6 million ounces, an increase of 43% from the 3.2 million ounces at year-end

2025, with a significant Mineral Resource base demonstrating additional potential for longer-term upside

o Measured & Indicated Mineral Resources, exclusive of Mineral Reserves, total 1.7 million ounces of gold as

compared to the 1.8 million ounces of M&I Resources as of year-end 2025

o Inferred Mineral Resources are an additional 0.3 million ounces of gold as compared to the 0.5 million ounces as

of year-end 2025

• Inclusive of mined depletion, gold Mineral Reserves in the 2026 Marigold TRS increased significantly as

compared to the 2024 TRS, while Indicated and Inferred Mineral Resources remained materially unchanged

over the same time period

o The gold prices used in the calculation of Marigold Mineral Reserves and Mineral Resources are $2,200/oz and

$2,500/oz, respectively

• 2026 Marigold TRS incorporates the maiden life of mine plan for the Buffalo Valley project (“Buffalo Valley”) with 0.7

million ounces of gold Mineral Reserves and first production expected in 2029

o Growth capital investment over the life of mine totals $542 million, including the development of Buffalo Valley and

its stand-alone heap leach facility, as well as fleet additions to support a 33% increase in overall mining rates at

Marigold to an average of 138 million tonnes per annum

o Investment in fleet modernization and expansion will improve productivity and operational flexibility to support the

multi-decade mine life at Marigold

(1 )

The Company reports non-GAAP financial measures including after-tax free cash flow to manage and evaluate its operating performance at its mines. See “Non-

GAAP Financial Measures” at the end of this press release for an explanation of these financial measures and a reconciliation of these financial measures to

operating cash flow, which is the most comparable GAAP financial measure.

(2)

The calculations of average annual gold production use 2027 as Year 1, since 2026 represents a partial year of operation in the TRS. From 2027 onwards, life of

mine gold production at Marigold is 3.2 million ounces at an AISC of $2,005 per ounce sold.

SSR MINING | PAGE 2

Rod Antal, Executive Chairman of SSR Mining, said, “Today’s updated life of mine plan reinforces Marigold’s position as a

premier, multi-decade asset in the United States. Over the next three years, we plan to invest in Marigold to modernize the

operation for future success through fleet and heap leach pad expansions that aim to improve its operational flexibility and

reliability.

Importantly, over the next five years we expect Marigold will average more than 230,000 ounces of gold production annually,

aligned with the prior TRS expectations and supporting average annual gold production of approximately 360,000 ounces

from our U.S. assets over that period. Longer-term, the mine is expected to average 200,000 ounces of gold production

annually through 2040, delivering a more than 50% increase in life of mine production over the prior mine plan.

Investing in organic growth is one of the key pillars of our capital allocation strategy, and this TRS provides a clear pathway

for us to execute on that strategy and create value for shareholders. This new mine plan increases Mineral Reserves by

43% as compared to year-end 2025 while Indicated and Inferred Resources remain essentially unchanged, demonstrating

our track record of exploration and resource development success while highlighting further potential for additional mine life

extension in the future.”

The TRS, with an effective date of May 1, 2026, has been prepared in accordance with S-K 1300 and will be available on

October 13, 2026 on the Company’s website and on a Current Report on Form 8-K to be filed with the U.S. Securities and

Exchange Commission (“SEC”).

SSR MINING | PAGE 3

Figure 1: 2026 Marigold TRS – Production Summary (in koz)

Table 1: 2026 Marigold TRS – Key Metrics

(3)

Five-Year Profile Active Mining Total Mine Life

Unit 2027 – 2031 2027 – 2040 2027 – 2050

Total Gold Production Au koz 1,153 2,816 3,208

Average Annual Gold Production Au koz 231 201 169

Total Operating Cash Flow (GAAP) $M $2,353 $4,955 $5,978

Total Capital Costs (GAAP)

(4)

$M $817 $1,133 $1,231

Total Free Cash Flow (non-GAAP)

(5)

$M $1,536 $3,822 $4,747

Average Annual Free Cash Flow $M $307 $273 $253

Cost of Sales (GAAP) $/oz sold $1,990 $1,959 $1,793

Cash Costs (non-GAAP)

(5)

$/oz sold $1,991 $1,960 $1,795

All-In Sustaining Costs (non-GAAP)

(5)

$/oz sold $2,279 $2,183 $2,005

(3)

Five-Year Profile metrics are from 2027 to 2031, Active Mining metrics are from 2027 to 2040 and Total Mine Life metrics are summed over the period of 2027 to

  1. Average Total Mine Life metrics are calculated over the period 2027 to 2045, as residual heap leaching concludes in 2045.

(4)

Total capital costs include sustaining capital, development capital, and reclamation.

(5)

The Company reports non-GAAP financial measures including after-tax free cash flow and All-In Sustaining Cost (“AISC”) per ounce sold to manage and evaluate

its operating performance at its mines. All cash flow figures are presented after tax. See “Non-GAAP Financial Measures” at the end of this press release for an

explanation of these financial measures and a reconciliation of these financial measures to operating cash flow and cost of sales, which are the most comparable

GAAP financial measures. Cost of sales excludes depreciation, depletion, and amortization.

Table 2: 2026 Marigold TRS – After-Tax NPV Sensitivity

LOM Average

Gold Price

$/oz $3,158 $3,553 Base Case

(6)

$4,342 $4,737

Sensitivity % -20% -1 0% — +10% +20%

NPV5% $M $1,609 $2,471 $3,334 $4,196 $5,058

(6)

Base Case gold price assumption averages $3,948/oz over the life of mine, including the long-term gold price of $3,710/oz starting in 2031. See “assumptions” at

the end of this press release for a summary of gold prices used in the 2026 Marigold TRS.

SSR MINING | PAGE 4

Marigold Mineral Reserves and Mineral Resources (“MRMR”)

(7)

Marigold is located in southeastern Humboldt County, Nevada, United States on the Battle Mountain-Eureka trend,

approximately 5 kilometers south-southwest of the town of Valmy, Nevada. The Marigold Complex includes the Marigold

Mine and the Buffalo Valley and Trenton Canyon deposits. Buffalo Valley is located approximately 24 kilo meters southwest

of the main infrastructure at Marigold. Since commencing operations in 1989, Marigold has produced over 5 million ounces

of gold.

Table 3: 2026 Marigold TRS – MRMR as of May 1, 2026

(100% attributable) Tonnes (Mt) Grade (g/t) Gold (Moz)

Total P+P Reserves 359 0.40 4.63

M&I Mineral Resources 131 0.40 1.66

Inferred Mineral Resources 29 0.31 0.29

Combining Marigold with the Company’s CC&V gold mine in Colorado established SSR Mining as the third largest gold

producer in the USA. Both operations now feature multi-decade mine lives and host significant Mineral Resource bases to

support potential for future growth and extension.

Figure 2: SSR Mining – MRMR by U.S. Asset

Marigold CC&V USA Consolidated

(7)

Please see “Supplemental Mineral Reserve and Mineral Resource Information” at the end of this press release for additional details. Mineral Resources are

exclusive of Mineral Reserves. Numbers may not add due to rounding.

Figure 3: SSR Mining – Combined U.S. Production Profile

0

50

100

150

200

250

300

350

400

450

500

2027E2028E2029E2030E2031E2032E2033E2034E2035E2036E2037E2038E2039E2040E2041E2042E

Gold Production (koz)

Marigold Gold Production (2026 TRS)CC&V Gold Production (2025 TRS)

SSR MINING | PAGE 5

2026 Marigold TRS Overview

Geological understanding of the Marigold Complex is supported by more than three decades of mining operations, extensive

exploration programs, geologic mapping, geophysical surveys, metallurgical testing, production history, and ongoing

resource definition drilling.

Mining & Processing

The 2026 Marigold life of mine plan features 15 years of active mining and 20 years of total production, inclusive of heap

leach pad rinsing and drawdown. The Marigold Complex mine plan outlined in the 2026 Marigold TRS has five distinct areas

of mining: the main Mackay pit (including the Red Dot and DG80 areas), the North Mackay pits, the Valmy pits, the New

Millennium area, and Buffalo Valley. A separate mining fleet of 8 to 10 trucks and two hydraulic shovels was initially

considered for Buffalo Valley, however, procuring additional trucks and loading units in 2027 allows for accelerated waste

stripping at Marigold ahead of initial development at Buffalo Valley. Peak fleet size in the 2026 Marigold TRS is 45 haul

trucks, six shovels and two loaders. This expanded fleet is then adequate to operate both Marigold and Buffalo Valley

simultaneously over the life of mine and enables increased flexibility in mine planning going forward.

On average, the operating period from 2026 to 2040 includes average mining rates of approximately 380,000 tonnes per

day (138.3 million tonnes per annum) with a life of mine strip ratio of 5.3:1. Stacking rates are expected to average

approximately 20 million tonnes per annum at Marigold over the life of mine, while the Buffalo Valley heap leach facility is

designed to accommodate stacking rates of up to 14 million tonnes per annum. The life of mine gold recovery across

Marigold and Buffalo Valley is 72% over an average of 90 to 120 day leach cycle, with an average stacked grade of 0.44

grams per tonne. Life of mine gold production totals 3.34 million ounces, including approximately 0.3 million ounces of

current work-in-progress inventory recovered over the life of mine.

The Buffalo Valley heap leach facility will be constructed and operated in a manner very similar to the main Marigold facility.

Run of mine ore will be truck stacked in 7.5 meter to 12.5 meter lifts. Following heap leaching, pregnant solution will be

pumped into three Carbon-in Column (CIC) trains for adsorption. Loaded carbon from the adsorption circuit will be

transported to the Marigold elution facility for final recovery, with barren carbon then transported back to the Buffalo Valley

facility. Buffalo Valley will require upgrades to the road connecting to main Marigold facilities, and will require the construction

of approximately 14.5 kilometers of power line from the existing North Peak power line to service the project site.

Table 4: 2026 Marigold TRS – Operating Metrics Summary

Unit Life of Mine

Total Material Mined Mt 1,881

Average Daily Mining Rate ktpd 380

Total Ore Mined Mt 298

Total Waste Mined Mt 1,583

Strip Ratio

W:O 5.3:1

Total Ore Processed Mt 298

Average Daily Processing Rate ktpd 58

Ore Grade Stacked g/t 0.44

Contained Gold Stacked koz 4,255

Gold Recovery

% 72%

SSR MINING | PAGE 6

Infrastructure

The Marigold Complex is accessed via a five kilometer public road connected to the U.S. Interstate Highway 80. Marigold

is grid connected, while water for operations is supplied by three existing groundwater production wells. Mine dewatering

wells are used to supplement production wells when needed. Where possible, operations at Buffalo Valley will leverage

existing infrastructure at Marigold, including the maintenance facilities and administrative offices. A tailings storage facility

(TSF) is present at Marigold but has been decommissioned since operations transitioned solely to heap leaching.

Operating Costs

Forecasted operating cost estimates related to the development of the 2026 Marigold TRS are derived from annual budgets

and historical actuals over the long life of the current operation. The life of mine operating cost estimate for the Marigold

Complex is $16.78 per tonne of stacked ore. Life of mine operating costs in the 2026 Marigold TRS do not account for non-

cash inventory movements and other minor non-cash items that impact the Company’s calculation of cash costs and AISC.

Table 5: 2026 Marigold TRS – Mine Operating Cost Summary

Operating Costs Life of Mine ($M) Stacked ($/Tonne)

Mining & Maintenance $3,741

$12.57 ($1.99/t moved)

Processing $804

$2.70

G&A $451

$1.51

Total Costs $4,996

$16.78

Labor and diesel are the two largest components of operating costs at Marigold. Diesel prices for the economic analysis

were based on the latest available consensus forward-looking price forecasts and compared to those used in other

published studies. Near-term diesel price assumptions in the 2026 Marigold TRS average approximately $4.00/gallon before

normalizing to $3.00/gallon over the long-term. The effective NSR royalty on the Marigold property in the 2026 Marigold

TRS is approximately 6.9%, while the effective NSR royalty for the Buffalo Valley deposit is fixed at 3.5% over the life of

mine.

Figure 4: 2026 Marigold TRS – Cost Breakdown

SSR MINING | PAGE 7

Capital Costs

Total life of mine capital outlined in the 2026 Marigold TRS is $1,385 million, including $669 million in sustaining capital.

Sustaining capital costs include:

• Replacement of mining equipment as it reaches its economic life during the active mining period. The majority of

COMPLEMENTARY STRATEGIC TRANSACTION FURTHER ENHANCES

THE FUTURE OF SSR MINING’S US PLATFORM

 ROXMORE’S MULTI-MILLION OUNCE CONVERSE PROJECT IS LOCATED SIX KILOMETERS FROM THE MARIGOLD

COMPLEX IN NEVADA

 FOLLOWING THE CONSTRUCTION OF THE BUFFALO VALLEY PROJECT, SSR MINING ENVISIONS DEVELOPING

CONVERSE AS A CONTIGUOUS ASSET TO MARIGOLD WITH THE POTENTIAL TO ADD APPROXIMATELY 150,000 TO

17 0,000 OUNCES OF ANNUAL GOLD PRODUCTION OVER 10+ YEARS

 ONCE CONVERSE IS IN PRODUCTION, SSR MINING’S US PLATFORM IS EXPECTED TO EXCEED 450,000 OUNCES OF

ANNUAL PRODUCTION DURING PEAK YEARS AND AVERAGE APPROXIMATELY 350,000 – 400,000 OUNCES OF GOLD

PRODUCTION ANNUALLY BETWEEN 2033 AND 2042

 POTENTIAL TO DELIVER +$200 MILLION IN LIFE OF MINE SYNERGIES AS COMPARED TO A STAND-ALONE OPERATION

 HIGHLY ACCRETIVE ALL-CASH TRANSACTION PAID FROM SSR MINING’S EXISTING CASH POSITION

 NO MATERIAL CAPITAL EXPENDITURES EXPECTED UNTIL EARLY 2030S

 REINFORCES SSR MINING’S COMMITMENT TO LOW CAPITAL INTENSITY GROWTH IN ITS CORE JURISDICTIONS,

BUILDING ON THE COMPANY’S POSITION AS THE THIRD LARGEST GOLD PRODUCER IN THE USA

DENVER - SSR Mining Inc. (Nasdaq/TSX: SSRM) ("SSR Mining" or the “Company") is pleased to announce that it has

entered into a definitive agreement (the “Agreement”) whereby a wholly owned affiliate of SSR Mining will acquire all of the

issued and outstanding shares of Roxmore Resources Inc. (TSX:RM) (“Roxmore”) pursuant to a court approved plan of

arrangement under the Business Corporations Act (British Columbia) (the “Transaction”). All figures are in U.S. dollars,

unless otherwise indicated.

Roxmore’s Converse Gold Project (“Converse”, the “Project”) is located 6 kilometers west of SSR Mining’s Marigold

Complex (“Marigold”) on the Battle Mountain – Eureka Trend in Nevada, USA. Developing Converse as a contiguous asset

to Marigold is expected to create opportunities for an expanded production profile in Nevada and deliver more than $200

million in life-of-mine synergies compared to the development of the Project on a stand-alone basis.

Under the terms of the Transaction, Roxmore shareholders will receive C$6.75 per Roxmore common share in cash

consideration. Roxmore shareholders will also receive common shares of a newly created gold exploration company

(“SpinCo”) that will hold interests in Roxmore’s Rattlesnake Hills Project, Shabu River Project, and Newton Property. SpinCo

will be funded with US$10,000,000 in cash and will be owned 85.01% by former Roxmore shareholders and 14.99% by

SSR Mining and be led by key members of Roxmore’s current management team. The cash component of the consideration,

excluding the value of SpinCo, represents a 27% premium to Roxmore’s closing price on the Toronto Stock Exchange as of

October 9

th

, 2026 and a 47% premium to the 20-day volume weighted average price (“VWAP”). The fully-diluted in -the-

money equity value of the Transaction (excluding the value of SpinCo) is estimated to be approximately $464 million and

enterprise value of $392 million. SSR Mining will fund the cash component of the consideration from the Company’s current

balance sheet.

SSR MINING | PAGE 2

Strategic Rationale for the Transaction

• Adds a multi-million ounce heap leachable resource six kilometers from Marigold providing a clear pathway to

future production growth and district-scale development

o Roxmore’s 2026 mineral resource estimate included 103 million tonnes of Indicated resources at 0.65 g/t containing

2.2 million ounces of gold and 218 million tonnes of Inferred resources at 0.43 g/t containing 3.0 million ounces of

gold

(1)

o SSR Mining envisions developing Converse as a contiguous asset to the Marigold Complex using the same

$2,200/oz Mineral Reserve and $2,500/oz Mineral Resource pit shell assumptions used in the 2026 Marigold

Complex technical report summary issued on October 13, 2026 (the “Marigold TRS”)

 This contrasts with the stand-alone development scenario presented in the 2026 Converse preliminary

economic assessment, which was based on a $3,000/oz resource pit shell

(2)

o Additional resource growth and conversion potential exists through future resource development and exploration

drilling

• Potential to materially enhance longer-term production scale in the USA

o Under SSR Mining’s proposed development approach, Converse has the potential to add approximately 150,000

to 170,000 ounces of gold production annually over an estimated 10+ year mine life with initial production targeted

for 2033

o Initial capital for construction is estimated at $800 to $900 million with no material capital spend expected until the

early 2030s

o Combined with Marigold and Cripple Creek & Victor (“CC&V”), the Company’s active gold mine in Colorado and its

production profile as outlined in the 2025 CC&V technical report summary issued on November 10, 2025 (the

“CC&V TRS”), SSR Mining has the potential to produce 350,000 to 400,000 ounces of annual gold production from

the USA through the 2030s

• Synergies of over $200 million uniquely available to SSR Mining

o Converse’s proximity to Marigold provides the unique potential to realize estimated undiscounted life-of-mine

synergies of at least $200 million through the elimination of duplicate site and corporate G&A costs, as well as

procurement and supply chain efficiencies across the Company’s US platform

o Potential additional synergies to be evaluated in future technical work, including shared maintenance facilities,

mining fleet optimization, shared water rights, and other areas, representing additional potential upside

• Converse will benefit from SSR Mining’s permitting, mine development, and operational expertise

o Marigold has been in operation since 1989, providing SSR Mining with extensive operational experience,

established stakeholder relationships and a track record of delivering value in the region

o Technical due diligence was informed by current Marigold operating costs and recent detailed engineering work

completed for the 2026 Marigold TRS, providing a high degree of confidence in the projected capital and operating

cost assumptions for Converse

o SSR Mining will build upon the extensive due diligence completed on Converse to further optimize the Project

o Near-term work at Converse will focus on environmental baseline studies, permitting, flowsheet optimization, and

technical de-risking activities

• Leverages SSR Mining’s proven track record of creating significant value for shareholders through strategic

M&A

o Transaction expected to be accretive to key per share metrics including net asset value and gold Mineral Resources

with an investment IRR, inclusive of the cost of acquisition, in excess of SSR Mining’s internal hurdle rate

o SSR Mining’s in-house expertise operating the large tonnage operations at Marigold and CC&V is expected to help

ensure the successful integration, development and future operation of Converse

o The Marigold Complex was acquired for a total acquisition cost of $309 million, inclusive of the acquisitions of the

Buffalo Valley and Trenton Canyon properties, and now features a +20-year mine life with an NPV

5%

of $3.3B and

has generated more than $1 billion in mine-site free cash flow since acquisition

(3)

o Since acquiring CC&V in 2025 for total transaction consideration of $275 million, the operation has generated more

than $345 million in mine-site free cash flow and carries a consensus NPV of $1.8 billion

SSR MINING | PAGE 3

Rod Antal, Executive Chairman of SSR Mining, said, “The acquisition of Roxmore and its Converse Gold Project

represents a compelling opportunity to add a high-quality multi-million ounce gold resource next door to our Marigold mine

at an attractive valuation. We have been carefully monitoring the progress of the Converse deposit for some time, and have

conducted a focused due diligence review of the asset. Our due diligence process has been informed by our operational

expertise at Marigold, including the technical work completed earlier this year for the construction of the nearby Buffalo

Valley project. SSR Mining is the natural acquiror of this exciting deposit and developing an asset in close proximity to

Marigold will allow for clear operating and financial efficiencies.

Building on the multi-decade mine life we have now defined for Marigold, Converse has the potential to add 150,000 to

170,000 ounces of average annual gold production to our US operations. The Transaction further reinforces the quality and

scale of our platform in the USA and demonstrates our commitment to deliver value accretive growth in our core jurisdictions.

The acquisition will be fully funded from our existing cash position and is aligned with our disciplined capital allocation

strategy. Additionally, with no material development spend until the early 2030s, the Transaction ensures SSR Mining retains

its free cash flow leadership, supporting the potential for continued, peer-leading capital returns.”

Overview of the Converse Gold Project

Strategic Location

The Converse Gold Project borders the Marigold property and is located approximately 6 kilometers from Marigold’s main

infrastructure, creating opportunities for shared services during future development. Combined with SSR Mining’s

operational expertise and track record of value creation at Marigold, the Company expects meaningful cost savings and

development efficiencies as compared to the stand-alone operation of the Converse Project.

The Converse property is comprised of 526 unpatented mining claims and seven fee land parcels, covering more than 5,000

hectares in Humboldt and Pershing counties, Nevada. The Project is expected to be evaluated as a future extension of the

broader Marigold Complex.

Figure 1: Project Location

SSR MINING | PAGE 4

Geology

The Converse property hosts two gold-rich skarn deposits known as North Redline and South Redline. These deposits

formed following the emplacement of the Redline granitic intrusion into the Havallah Formation sedimentary package.

Mineralization is present to 650 meters depth and over a cumulative strike length in excess of 1.2 kilometers. The deposit

remains open at depth and along several structural trends, highlighting the potential for future resource growth. Sulfide

abundance is relatively low throughout the deposits, typically under 0.5%, and the oxidation profile extends to 400 meters

depth along key structures.

As part of its due diligence process, SSR Mining completed an independent review of the Converse Mineral Resource

estimate using Mineral Reserve and Mineral Resource price assumptions applied at Marigold, which are lower than the

$3,000/oz pit shell used in Roxmore’s 2026 preliminary economic assessment for Converse (the “2026 Converse PEA”).

The due diligence process also identified significant upside potential through additional resource development and

exploration drilling at the Project, as well as through the potential for higher gold price assumptions in resource shell designs.

Mining

Converse will be mined as a conventional open pit operation using standard truck and shovel mining methods. Importantly,

SSR Mining envisages the development of the Converse Project at reduced annual ore tonnages than outlined in the 2026

Converse PEA in context of utilizing a $2,200/oz pit shell, consistent with the Mineral Reserve assumptions applied at

Marigold.

Figure 2: SSR Mining – Illustrative Combined U.S. Production Profile

(4)

Metallurgy & Processing

Extensive metallurgical testing demonstrates that the Converse Project mineralization is amenable to conventional heap

leaching. The existing metallurgical database is substantial and includes approximately 1,000 bottle roll tests and 75 column

leach tests indicating that crush size is the dominant driver of gold recoveries.

As part of its due diligence review, SSR Mining completed independent metallurgical verification, including copper solubility

and cyanide soluble gold testing on representative samples across different lithologies, deposit depths and oxidation levels.

The results of this work support SSR Mining’s assessment of the Project and provide confidence in the metallurgical

assumptions underpinning its evaluation.

As project development advances, SSR Mining will conduct further metallurgical studies that will focus on optimizing

flowsheet design, maximizing recoveries and refining operating parameters. Currently, SSR Mining envisions processing

Converse ore via a 3-stage crush heap leach operation. Processing cost assumptions are supported by recent detailed

engineering and unit price estimates completed for the 2026 Marigold TRS.

0

50

100

150

200

250

300

350

400

450

500

2027E2028E2029E2030E2031E2032E2033E2034E2035E2036E2037E2038E2039E2040E2041E2042E

Gold Production (koz)

Marigold Gold Production (2026 TRS)CC&V Gold Production (2025 TRS)Converse Gold Production (Estimate)

Combined U.S. platform has potential to average 350 to

400 koz of gold production annually in the 2030s

SSR MINING | PAGE 5

Capital Costs

Initial capital costs are estimated at $800 to $900 million with no material development capital requirements until the early-

2030s.

Overall capital cost estimates for the potential development of Converse are supported by the due diligence completed by

SSR Mining, detailed engineering work completed as part of the 2026 Marigold TRS for all key items including fleet additions,

heap leach pads and process plant as well as from SSR Mining’s direct experience related to hydrogeology, dewatering,

site power, and mine equipment costs at Marigold.

Environmental & Permitting

Development of the Converse Project will require federal permitting led by the U.S. Bureau of Land Management, including

submission of a Plan of Operations and completion of environmental baseline studies. Given the anticipated scale of the

Project, an Environmental Impact Statement process is expected.

SSR Mining believes Converse benefits from a well-defined permitting pathway and intends to leverage its extensive

experience permitting and operating mines in Nevada, including Marigold and the adjacent Buffalo Valley project.

Transaction Summary

The proposed Transaction will be completed pursuant to a plan of arrangement under the Business Corporations Act (British

Columbia). The Transaction is subject to certain approvals at a special meeting of Roxmore securityholders to be held (the

“Special Meeting”), including the approval of (i) at least 66 2/3% of the votes cast by the securityholders of Roxmore

Prompts

SSR Mining Inc. (ticker SSRM), listed in Canada.

Company History

Date Change Detail
Aug 10, 2017 Renamed SILVER STANDARD RESOURCES INC → SSR MINING INC.

ETFs Holding SSR Mining Inc.

ETF Weight in ETF Shares Market value As of
SLJY 2.02% 38,725 $ 1.095M Jun 30, 2026
SHRT 1.39% 6,882 $ 180.102K Nov 17, 2026
GDMN 1.24% 72,553 $ 2.729M Aug 31, 2026
ECML 1.23% 56,562 $ 1.48M Nov 18, 2026
FTKI 1.18% 11,503 $ 301.034K Nov 16, 2026
SEIS 0.46% 94,787 $ 2.681M Jun 30, 2026
GVLU 0.46% 46,452 $ 1.216M Nov 17, 2026
AVDV 0.45% 3,336,606 $ 87.285M Nov 16, 2026
FSEV 0.40% 940 $ 26.583K Jun 30, 2026
FSCC 0.39% 37,884 $ 1.425M Aug 31, 2026
PSC 0.32% 260,290 $ 7.361M Jun 30, 2026
SYZ 0.27% 6,543 $ 185.036K Jun 30, 2026
RESM 0.23% 303 $ 8,568.84 Jun 30, 2026
VFMF 0.23% 60,448 $ 2.273M Aug 31, 2026
DFIS 0.22% 472,594 $ 12.741M Nov 12, 2026
DISV 0.22% 410,265 $ 11.061M Nov 12, 2026
SCDS 0.21% 742 $ 19.388K Nov 17, 2026
VFQY 0.18% 24,630 $ 926.334K Aug 31, 2026
AFSM 0.17% 9,398 $ 245.946K Nov 16, 2026
FESM 0.17% 346,516 $ 9.799M Jun 30, 2026
RUSC 0.16% 4,547 $ 128.589K Jun 30, 2026
AVDS 0.16% 22,584 $ 590.796K Nov 16, 2026
VFVA 0.13% 33,727 $ 1.268M Aug 31, 2026
DXIV 0.10% 9,200 $ 248.03K Nov 12, 2026
WSGE 0.10% 2,285 $ 59.707K Nov 18, 2026
AVDE 0.06% 452,528 $ 11.838M Nov 16, 2026
VFMO 0.06% 29,233 $ 1.099M Aug 31, 2026
DFIC 0.05% 272,934 $ 7.358M Nov 12, 2026
MSSM 0.05% 8,649 $ 325.289K Aug 31, 2026
DFSI 0.05% 19,881 $ 535.987K Nov 12, 2026
DFAX 0.04% 162,249 $ 4.374M Nov 12, 2026
DFAI 0.03% 191,367 $ 5.16M Nov 12, 2026
AVIV 0.00% 2,784 $ 72.829K Nov 16, 2026

Securities

Ticker Type Class Market Exchange Last price Price date
SSRM Common share — US nasdaq 33.32 USD 2026-09-30
SSRM canonical Common share — CA tsx — —