Hydro One Limited is an electricity transmission and distribution service provider that operates the high-voltage power grid and local distribution networks in Ontario, Canada. The company owns and operates the majority of the transmission system in the province, transporting electricity from generators and interties to local distribution companies and large industrial customers. Its transmission network includes bulk electricity system lines, area supply lines, transmission stations, and telecommunications facilities, managed from a central control centre. Hydro One distributes electricity to predominantly rural residential and business customers, covering a significant portion of Ontario's geographic area, and provides power to remote communities. The company engages in the development and construction of new transmission infrastructure, often utilizing a First Nation equity partnership model where Indigenous communities hold equity stakes in specific transmission line projects. Key subsidiaries and partnerships include Hydro One Networks, which handles the core transmission and distribution operations, and limited partnerships such as B2M LP, NRLP, and CLLP, which own and operate specific transmission lines. The company also acquired HOSSM, which operates under a deferred rebasing period for its revenue requirements.

Summarised from the annual information form, filed Feb 2026

Industry Utilities - Regulated Electric Homepage hydroone.com
Sector Utilities IR page hydroone.com/investor-relations
Tags
electricity transmission, electricity distribution, regulated utility, first nation partnerships, remote community power, grid infrastructure, Hydro One Networks, B2M LP, NRLP, CLLP, HOSSM, Ontario Energy Board, IESO, NERC, NPCC, Canada Energy Regulator, Hydro-Electric Power Commission of Ontario, HEPC, Save on Energy, Bowmanville to Parkway Transmission Line, Orangeville to Barrie Reconductoring Project, Windsor to Lakeshore Transmission Line, Greenstone Transmission Line, Sudbury to Barrie Transmission Line, Red Lake Transmission Line, Chatham to Lakeshore Transmission Line, Durham Kawartha Power Line, Longwood to Lakeshore Transmission Line, North Shore Link, Northeast Power Line, St. Clair Transmission Line, Wawa Timmins Power Line, Second Longwood to Lakeshore Transmission Line, Second Sudbury to Barrie Transmission Line
Press page hydroone.com/newsroom

Metrics

Valuation  
Market cap C$ 30.431B
Market cap (USD) $ 21.634B
P/E —
PEG —
P/BV —
P/S —
P/OCF —
P/FCF —
Dividend yield —
Turnover / mcap —
Returns  
ROE 10.8%
ROI 10.5%
ROIC 10.5%
Profit margin —
Growth  
Revenue growing —
Profits growing Yes
Revenue up 3y —
Revenue up 5y —
Earnings growth 3y (net profit CAGR) 8.6%
Quality  
Profitable Yes
Margin expanding —
Buying back stock —
Diluting (TTM) —
Debt/Equity —
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 0
Quality score —
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021 FY 2020 FY 2019 FY 2018
Assets 39.671B 36.682B 32.852B 31.29B 30.221B 30.133B 27.061B 25.657B
Net profit 1.354B 1.174B 1.092B 1.057B 972M 1.792B 952M -31M

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

Hydro One reports third quarter results Bull 2 Bear 1 Results

TORONTO, November 10, 2026 - Hydro One Limited (Hydro One or the Company) today announced its financial and operating results for the third quarter ended September 30, 2026.

Third Quarter Highlights

•Third quarter basic earnings per share (EPS) of $0.69 compares to EPS of $0.70 for the same period in 2025. Year-to-date EPS of $1.96 compares to EPS of $1.84 for the same period in 2025.

•The change in the third quarter EPS was largely due to higher operation, maintenance and administration (OM&A) costs, higher depreciation, amortization and asset removal costs, and higher interest on long-term debt, partially offset by increased revenues from Ontario Energy Board (OEB)-approved rates, and higher peak demand.

•On October 7, 2026, Hydro One Networks Inc. submitted its 2028-2032 Joint Rate Application to the OEB with a proposed approximately $37 billion investment plan, inclusive of OM&A, for its transmission and distribution systems. The company also updated its future capital investment disclosures for the 2028-2032 period to align with the filing.

•Hydro One filed a leave-to-construct application with the OEB for the North Shore Link transmission line project.

The proposed plan would replace aging infrastructure and add electricity system capacity for Ontario’s growing electricity needs

TORONTO, Oct. 7, 2026 – Today, Hydro One Networks Inc. (Hydro One) submitted its 2028-2032 Joint Rate Application to the Ontario Energy Board (OEB) with a proposed investment plan for its transmission and distribution systems. If approved, the approximately $37 billion five-year plan will address Ontario’s growing electricity demand and strengthen the reliability and security of the electricity system. The plan was informed by feedback from more than 100,000 customers across the province and prioritizes the right investments at the right time to deliver value for people across Ontario.

“Ontario’s growth, prosperity and competitiveness depend on a reliable and secure electricity system,” said Megan Telford, President and CEO, Hydro One.

The new line is expected to strengthen the electricity system and support economic growth in the northeast

TORONTO, September 11, 2026 /CNW/ - Today, Hydro One Networks Inc. (Hydro One) and Hydro One Sault Ste. Marie LP (HOSSM) filed a joint leave-to-construct application with the Ontario Energy Board (OEB) to seek approval to construct the North Shore Link.

Once approved, Hydro One will construct the proposed North Shore Link, a new 230-kilovolt transmission line connecting Mississagi Transformer Station (TS) near Wharncliffe to HOSSM-owned Third Line TS in Sault Ste. Marie. As part of the project, Hydro One will upgrade Mississagi TS and expand nearby Algoma TS to meet system requirements, while HOSSM will manage all upgrades to Third Line TS. The $1.3 billion investment is expected to strengthen the connection between the northeast and northwest and improve the resiliency of the northern transmission system. The line is expected to be in service in 2029.

Through Hydro One’s First Nation Equity Partnership Model, nine potential First Nation partners will have the opportunity to invest in a 50 per cent equity stake in the transmission line component of the project.

Prompts

Hydro One Limited (ticker H), listed in Canada.

ETFs Holding Hydro One Limited

ETF Weight in ETF Shares Market value As of
JSTC 0.99% 71,963 $ 2.917M Nov 17, 2026
AVSD 0.13% 11,683 $ 473.676K Nov 16, 2026
AVDE 0.06% 295,034 $ 11.962M Nov 16, 2026
DFAI 0.05% 234,988 $ 9.405M Nov 12, 2026
DFSI 0.05% 15,169 $ 607.1K Nov 12, 2026
DFIC 0.02% 81,107 $ 3.246M Nov 12, 2026
DFAX 0.01% 41,196 $ 1.649M Nov 12, 2026

Securities

Ticker Type Class Market Exchange Last price Price date
H canonical Common share — CA tsx — —
HRNNF Common share — US otc 35.77 USD 2026-09-30
HYNLY Depositary receipt — US otc — —