Denison Mines Corp is a uranium mining, development, and exploration company focused on the Athabasca Basin region of northern Saskatchewan, Canada. The company holds a majority interest in the Wheeler River Uranium Project, which includes the Phoenix and Gryphon deposits, and is currently constructing the Phoenix In-Situ Recovery (ISR) uranium mine. Denison also maintains minority interests in operating assets, including stakes in the McClean Lake Joint Venture, the Midwest Joint Venture, and the Waterbury Lake Property, which hosts the Tthe Heldeth Túé and Huskie deposits. Through its ownership of JCU (Canada) Exploration Company, Limited, the company holds interests in the Millennium, Kiggavik, and Christie Lake projects. Founded in 1954, Denison’s portfolio covers extensive prospective exploration ground in the Athabasca Basin.

Summarised from the company's own disclosures, fiscal year ended Oct 2026

Industry Uranium Homepage denisonmines.com
Sector Energy IR page denisonmines.com/investors/investors
Tags
uranium mining, uranium exploration, in-situ recovery, uranium development, mining joint ventures, uranium processing, Wheeler River Uranium Project, Phoenix, Gryphon, McClean Lake Joint Venture, Midwest Joint Venture, Waterbury Lake Property, Tthe Heldeth Túé, Huskie, JCU (Canada) Exploration Company Limited, Millennium, Kiggavik, Christie Lake, McClean Lake mill, SABRE
Press page denisonmines.com/news

Metrics

Valuation  
Market cap C$ 2.759B
Market cap (USD) $ 2.759B
P/E -18.15
PEG —
P/BV 10.66
P/S 798.60
P/OCF -57.63
P/FCF -33.10
Dividend yield —
Turnover / mcap —
Returns  
ROE -46.6%
ROI -32.7%
ROIC -6.9%
Profit margin -4,418.2%
Growth  
Revenue growing Yes
Profits growing No
Revenue up 3y No
Revenue up 5y —
Earnings growth 3y (net profit CAGR) —
Quality  
Profitable No
Margin expanding Yes
Buying back stock No
Diluting (TTM) No
Debt/Equity 80.3%
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 64
Quality score —
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2018 FY 2015 FY 2014 FY 2013 FY 2012 FY 2011 FY 2010 FY 2009
Revenue 4.918M 4.023M 1.855M 8.973M 11.28M 16.572M 10.466M 10.814M — 94.84M 133.345M 86.924M
Net profit -217.288M -91.119M 90.375M 14.354M -23.482M -67.438M -34.493M -87.116M -117.422M -69.434M — —
Free cash flow -118.644M -48.074M -33.901M -35.013M — -25.793M -26.503M -24.321M -19.802M -43.361M 8.564M -89.254M

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2018 FY 2015 FY 2014 FY 2013 FY 2012 FY 2011 FY 2010 FY 2009
Share price 3.64 2.46 — — 0.47 0.65 1.02 1.25 1.25 1.23 3.56 1.38
Price performance 12m 0.48 0.02 — — — -0.47 -0.22 -0.04 -0 -0.63 1.73 —

Filed figures

Figure Dec 2009 Dec 2010 Dec 2011 Dec 2012 Dec 2013 Dec 2014 Dec 2015
Balance sheet detail
Cash and deposits (USD) 19.8M 97.6M 53.5M 38.2M 21.8M 18.6M 5.37M
Intangible assets (USD) 4.44M 3.79M 2.84M 2.01M 1.25M 638,000 107,000
Cash flow detail
Operating cash flow (USD) -42.4M 35.6M -20M -6.77M -21.1M -23.5M -17.7M
Change in inventories (cash effect) (USD) — 1.88M 23.3M — — — —
Change in payables (cash effect) (USD) — 4M -5.67M — — — —
Interest paid (cash effect) (USD) -1.58M -27,000 -82,000 -7,000 -3,000 -2,000 -2,000
Income taxes paid (cash effect) (USD) -450,000 1.37M -80,000 348,000 51,000 0.00 0.00
Share-based compensation (USD) 3.85M 1.83M 3.33M 1.5M 903,000 800,000 588,000
Income detail
Total comprehensive income (USD) — 10.1M -78.9M -118M -102M -49.8M -99.3M
Comprehensive income to owners (USD) — 10.1M -78.9M -118M -102M -49.8M -99.3M
Reported Mar 29, 2011 Mar 29, 2012 Mar 29, 2012 Mar 15, 2013 Mar 19, 2014 Mar 12, 2015 Mar 29, 2016

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

November 04, 2026

Download PDF Version


TORONTO, Nov. 4, 2026 /CNW/ -- Denison Mines Corp. ("Denison" or the "Company") (TSX: DML) (NYSE American: DNN) today filed its Condensed Consolidated Financial Statements and Management's Discussion & Analysis ("MD&A") for the three and nine months ended September 30, 2026. Both documents will be available on the Company's website (at www.denisonmines.com ), SEDAR+ (at www.sedarplus.ca ) and EDGAR (at www.sec.gov/edgar ). The highlights provided below are derived from these documents and should be read in conjunction with them. All amounts in this release are in Canadian dollars unless otherwise stated. PDF version

David Cates, President and CEO of Denison commented, "With a relatively short timeline for construction of the Phoenix In-Situ Recovery ("ISR") uranium mine, executing during the prime summer construction season is critical. We are very pleased with our ability to immediately mobilize to site after regulatory approvals and ramp up activity to achieve a full-scale rate of construction for the third quarter.  Denison's results showcase significant construction progress at Phoenix and the potential to add meaningful shareholder value from the discovery of new mineralization on site. 

During the quarter, we prioritized schedule-critical and seasonally sensitive activities to capitalize on the summer construction season, and we ended our first quarter of full-scale construction with the project's total percentage completion estimated at 24%.  Based on this initial progress, we continue to target completion of construction and achievement of first production during the second half of 2028, which is approximately 2 years after the commencement of full-scale construction.

By the end of October 2026, nearly 50% of all site civil work was complete, including the establishment of the main access road from Highway 914, and all scopes required to advance construction of the process plant, the delivery and installation of key electrical assets, the commencement of freeze well drilling, and preparation of the airstrip for operations in Q4. In addition, the schedule-critical concrete work required to start construction of the process plant building during the winter is substantially complete. Offsite fabrication of modularized equipment is also progressing, with key electrical infrastructure, the freeze plant, and certain process tanks, amongst other equipment and materials, already received on site or released for shipment to site.

We are also pleased to report encouraging exploration results at the emerging Phoenix North target area, which is located within the surface footprint of the Phoenix ISR mine site.  Drill hole WR-857D1 intersected 0.39% eU__3__O__8 over 4.7 metres, and approximately 50 metres to the northeast drill hole WR-868 intersected 0.67% eU__3__O__8 over 2.5 metres.  Drilling in this area continues into the fourth quarter, as the discovery of additional resources in the immediate vicinity of Phoenix could add significant value to the project."

Highlights

  • Phoenix achieves 24% total completion after first quarter of full-scale construction

    Building on the successful completion of site preparation and early works construction in early July, Denison made significant progress executing on key construction work scopes during its first quarter of full-scale construction on site.  The project's total percentage completion as at September 30, 2026 is estimated at approximately 24%, which includes (i) engineering, PCM, and owner's costs at 32% completion, (ii) construction and construction indirect costs at 20% complete, and (iii) fabrication and delivery of equipment and materials at 32% complete.

    With full-scale construction commencing during the critical summer construction season, initial construction activities have focused on schedule and seasonally sensitive work.  Civil work continued with the main site access road from Highway 914 currently available for use, the substation area substantially completed and the freeze plant area and airstrip significantly advanced (with 100% of the final grade completed for the runway area). In addition, concrete work commenced in August and continues into the fourth quarter of 2026.  By the end of October 2026, site civil work is estimated to be nearly 50% complete and the concrete work required to enable the commencement of construction of the process plant building over the winter has been substantially completed.

  • Phoenix construction and procurement strategy allows continued productivity during winter months 

    With an approximately 2-year construction timeline targeted for Phoenix, Denison developed a procurement and execution strategy whereby key project components have been procured directly by Denison, rather than through its contractors, and modularization has been utilized wherever possible.  As a result, Denison is responsible for making progress payments as equipment is fabricated and the total project spend curve is thus front-loaded relative to the rate of construction progress on site.  This approach decouples fabrication of key equipment from onsite construction by utilizing offsite fabrication facilities which allows for continued productivity during the winter season.  Fabrication has commenced on the majority of the process plant equipment and shipment release has occurred for the site transformer, substation e-house, high-voltage substation yard equipment, switchgear, generators, freeze plants, and certain process tanks and construction bulks. 

    Year to date total Phoenix project expenditures totaled $161.1 million, including $105.0 million on construction and construction indirect costs and $39.0 million on procurement of equipment and materials.  Life to date expenditures on procurement of equipment and materials is approximately $56.8 million.

    Forecasted expenditures for 2026 are now estimated to be $278.6 million, with $39.9 million in procurement payments, $68.5 million in construction and construction indirect costs, and $9.1 million in engineering, PCM, and owner's costs estimated for the fourth quarter of 2026.

  • Additional mineralization discovered at Phoenix North exploration target area, located within surface footprint of the Phoenix ISR mine site 

    During the third quarter of 2026, drill hole WR-857D1 intersected 0.39% eU3O8 over 4.7 metres from 409.9 metres to 414.6 metres at the unconformity and represents the best mineralized hole drilled in this area of sparse historic drilling.  WR-857D1 is located approximately 10 metres up-dip and along section of WR-857, which was completed during the second quarter and intersected mineralized intervals of 0.20% eU3O8 over 1 metre from 417.6 metres, and 0.07% eU3O8 over 0.5 metres from 415.8 metres.  In October 2026, drill hole WR-868 encountered unconformity associated mineralization (0.67% eU3O8 over 2.5 metres from 413.1 metres to 415.6 metres) approximately 50 metres along strike to the northeast of WR-857, and drill hole WR-869A intersected additional mineralization (highlighted by 0.07% eU3O8 over 2.2 metres from 421.5 metres to 423.7 metres) 50 metres along strike to the southwest of WR-857.  See the MD&A for further details. Taken together, mineralization has now been intersected over 100-metres of strike length at the Phoenix North target area, which remains open in multiple directions with the anticipated optimal target horizon yet to be tested.

    While in the early stages of exploration discovery, the results at Phoenix North are especially encouraging as the mineralization is situated in the immediate vicinity of the Phoenix ISR mine currently under construction.

Phoenix ISR Uranium Mine: Project Overview as of October 15, 2026

Phoenix ISR Uranium Mine: Process plant raft slabs as of October 22, 2026

Phoenix ISR Uranium Mine: Power substation area as of October 23, 2026

Phoenix ISR Uranium Mine: Phase 1 freeze well drilling as of October 15, 2026

Phoenix ISR Uranium Mine: Airstrip preparation as of October 22, 2026

About Denison

Denison Mines Corp. was formed under the laws of Ontario and is a reporting issuer in all Canadian provinces and territories. Denison's common shares are listed on the Toronto Stock Exchange (the "TSX") under the symbol 'DML' and on the NYSE American exchange under the symbol 'DNN'.

Denison is a uranium mining, exploration and development company with interests focused in the Athabasca Basin region of northern Saskatchewan, Canada. The Company has an effective 95% interest in its flagship Wheeler River Uranium Project, which is the largest undeveloped uranium project in the infrastructure rich eastern portion of the Athabasca Basin region of northern Saskatchewan. In mid-2023, the Phoenix FS was completed for the Phoenix ISR mining operation, and an update to the 2018 Pre-Feasibility Study ("2018 PFS") was completed for the Gryphon deposit as a conventional underground mining operation (the "Gryphon Update"). Based on the respective studies, both deposits have the potential to be competitive with the lowest-cost uranium mining operations in the world.

Full-scale construction commenced at Phoenix in July 2026, which followed receipt of Federal approval of the project's Environmental Assessment and issuance of the Construction Licence in February 2026, as well as completion of site preparation and early works programs initiated in March 2026.  Construction is expected to take approximately 2 years with first production targeted for the second half of 2028.

Denison's interests in Saskatchewan also include a 22.5% ownership interest in the MLJV, which restarted mining with SABRE in 2025) and the McClean Lake uranium mill (currently utilizing a portion of its licensed capacity to process the ore from the Cigar Lake mine under a toll milling agreement), plus a 25.17% interest in the Midwest Main and Midwest A deposits held by the Midwest Joint Venture ("MWJV"), and a 70.55% interest in the Tthe Heldeth Túé ("THT") and Huskie deposits on the Waterbury Lake Property ("Waterbury"). The Midwest Main, Midwest A, THT and Huskie deposits are located within 20 kilometres of the McClean Lake mill. Taken together, the Company has direct ownership interests in properties covering ~459,000 hectares in the Athabasca Basin region.

Additionally, through its 50% ownership of JCU (Canada) Exploration Company, Limited ("JCU"), Denison holds further interests in various uranium project joint ventures in Canada, including the Millennium project (JCU, 30.099%), the Kiggavik project (JCU, 33.8118%) and Christie Lake (JCU, 34.4508%).

In 2024, Denison celebrated its 70th year in uranium mining, exploration, and development, which began in 1954 with Denison's first acquisition of mining claims in the Elliot Lake region of northern Ontario.

Technical Disclosure and Qualified Person

The scientific and technical information contained in this press release has been reviewed and approved by Ricardo Afonso, P.Eng., Denison's Vice President Projects, or Chad Sorba, P.Geo., Denison's Vice President Technical Services & Project Evaluation, each of whom is a Qualified Person in accordance with NI 43-101.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS 

Certain information contained in this press release constitutes 'forward-looking information', within the meaning of the applicable United States and Canadian legislation concerning the business, operations, and financial performance and condition of Denison. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as 'plans', 'expects', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates', or 'believes', or the negatives and/or variations of such words and phrases, or state that certain actions, events or results 'may', 'could', 'would', 'might' or 'will be taken', 'occur', 'be achieved' or 'has the potential to'.

In particular, this press release contains forward-looking information pertaining to the following: Denison's estimated completion status, and other outlook, plans and objectives with respect to Phoenix construction; assumptions and estimates with respect to the Company's other exploration, development and expansion programs, plans and objectives; Denison's land position; and expectations regarding Denison's joint venture ownership interests and the continuity of its agreements with its partners. Statements relating to 'mineral reserves' or 'mineral resources' are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral reserves and mineral resources described can be profitably produced in the future.

Forward looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Denison to be materially different from those expressed or implied by such forward-looking statements. For example, estimates of construction progress and related percentages are estimates subject to change, and may be impacted by many factors including contractor availability, labour availability, weather, and other events or circumstances.  In addition, the results of the Denison's studies, including the Phoenix FS, and field work, may not be maintained after further testing or be representative of actual mining plans for the Phoenix deposit after further design and studies are completed. Denison could decide or otherwise be required to discontinue testing, evaluation and development work at Wheeler River or other projects, or its exploration plans if it is unable to maintain or otherwise secure the necessary resources (such as testing facilities, capital funding, regulatory approvals, etc.) or operations are otherwise affected by regulatory restrictions or requirements.

Denison believes that the expectations reflected in this forward-looking information are reasonable, but no assurance can be given that these expectations will prove to be accurate, and results may differ materially from those anticipated in this forward-looking information. For a discussion in respect of risks and other factors that could influence forward-looking events, please refer to the factors discussed under the heading 'Risk Factors' in this MD&A. These factors are not, and should not be construed as being, exhaustive.  Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking information contained in this press release is expressly qualified by this cautionary statement. Any forward-looking information and the assumptions made with respect thereto speaks only as of the date of this press release. Denison does not undertake any obligation to publicly update or revise any forward-looking information after the date of this press release to conform such information to actual results or to changes in Denison's expectations except as otherwise required by applicable legislation.

Denison Reports Financial and Operational Results for Q3 2026, Highlighted by 24% Total Completion after First Quarter of Full-Scale Construction at Phoenix ISR Uranium Mine

SOURCE Denison Mines Corp.

Management

Ricardo Afonso

Ricardo Afonso

Vice President Projects

Mr. Afonso has over two decades of technical expertise and has led multidisciplinary teams on major projects across diverse industries on five continents.  Prior to joining Denison, Mr. Afonso served as Managing Director of Plus Natural Resources (+NR), a leading international engineering, project management and technical advisory business serving mining, energy, infrastructure and industrial clients – including the development and delivery of mining and energy projects from resource/project evaluation, feasibility, and FEED through execution readiness, constructability, and operational ramp-up.  Prior to that, Mr. Afonso served as Project Engineering Leader for Aker Solutions, providing TotalEnergies a turn-key subsea production system for the ultra-deepwater Kaombo oil field project offshore Angola, and Projects Director for Lundin Mining's Neves-Corvo Zinc Expansion Project in Portugal.

Ricardo holds a Master of Engineering in Mechanical Engineering from the Faculdade de Engenharia da Universidade do Porto (Portugal), completed additional mechanical engineering studies through the Erasmus program at the University of Bristol, and is a registered Professional Engineer in Canada through APEGA. He is also PMP® certified, a Chartered Engineer in Portugal and the European Union, and Six Sigma certified.

Denison logo and link to the home page.

Privacy Policy | Web Site Terms of Use

Great Place to Work Certified Aug 2025 - Aug 2026 Canada crest Great Place to Work Certified June 2024 - June 2025 Canada crest

©2026 - Denison Mines Corp.


©2026Denison Mines Corp.
All rights reserved.
Disclaimer

August 12, 2026

TORONTO, Aug. 12, 2026 /CNW/ -- Denison Mines Corp. ("Denison" or the "Company") (TSX: DML) (NYSE American: DNN) today filed its Condensed Consolidated Financial Statements and Management's Discussion & Analysis ("MD&A") for the three and six months ended June 30, 2026. Both documents will be available on the Company's website (at www.denisonmines.com

), SEDAR+ (at www.sedarplus.ca

) and EDGAR (at www.sec.gov/edgar

). The highlights provided below are derived from these documents and should be read in conjunction with them. All amounts in this release are in Canadian dollars unless otherwise stated. View PDF version

David Cates, President and CEO of Denison commented, "****Since the commencement of on-site activity at Phoenix in March 2026, we have advanced critical site preparation activities, including completion of over 20% of the total project site civil work and nearly 100% of the civil subgrade work needed for the process plant and wellfield areas, plus the installation of construction management and temporary camp facilities.

Critical first-year construction milestones are on track, including pouring of the concrete foundations for the process plant and main power transformer, commencement of installation of the freeze wall, installation of on-site power distribution, and establishment of the airstrip.

This quarter's financial results highlight the successful execution of our multi-year project financing strategy to monetize the 2.5 million pounds U3O****8 of physical uranium acquired in 2021.  These holdings were acquired at an average cost of $36.67 (US$29.66) per pound U3O****8 and we have been judiciously selling into a market of strengthening uranium prices. In Q2, we sold 750,000 pounds U3O****8 for an average realized price of $122.16 (US$89.17) per pound U3O8, which generated over $90 million in proceeds and a $64 million (233%) realized gain compared to the original purchase price. Importantly, these transactions provide meaningful funding for Phoenix without dilution to our shareholders.

Denison is now fully engaged in a critical and exciting phase of growth.  With significant construction progress being made daily at Phoenix, the Company having an active presence in the global uranium marketplace, and our continued investment in future growth through exploration and project development, we are well positioned to offer shareholders unique exposure to the uranium market at a time of growing recognition that the sector's fundamentals are robust and likely to continue improving." 

Highlights

  • **Completion of Site Preparation Activities and Commencement of Full-Scale Construction at Phoenix

**Since the commencement of site preparation and early works in March 2026, significant progress has been made by Denison and its construction partners to complete several critical site preparation activities – including substantial completion of site clearing activities, advancement of schedule-sensitive site civil works, and the establishment of construction management facilities. Preparation activities also involved the installation and commissioning of temporary construction camp facilities, which significantly increases the accommodation capacity of the Wheeler River property to nearly 400 people and allows a ramp-up in the on-site workforce.

Construction activity is expected to accelerate through the remainder of the summer months with the commencement of a second shift, which means seasonally sensitive civil and other construction work can continue virtually 24-hours a day in support of the completion of our key first-year construction milestones – including concrete pours of the foundations for the process plant and main power transformer, installation of the freeze wall, as well as earth works for the airstrip, and on-site power distribution.

By the end of July, over 20% of overall site civil work is estimated to be completed, including achievement of near 100% completion of civil subgrade work for the process plant and wellfield areas.  Aggregate production required for various site civil purposes continues at a nearby quarry, and the concrete batch plant has been mobilized to site.  Taken together, schedule-critical concrete-related activities for the main process plant and substation foundations are on-track for commencement in August.  Additionally, installation of the freeze wall for Phase 1 of the mine has been initiated. 

  • Uranium Sales Generate $92 million in Gross Proceeds and Crystalize 233% Gain from Acquisition Cost

In 2021, the Company acquired 2,500,000 pounds of U3O8 at a weighted average cost of $36.67 (US$29.66) per pound U3O8 to be held as a long-term investment to strengthen the Company's balance sheet and support the future financing of the Wheeler River project.  Consistent with this strategy, during the second quarter, Denison sold 750,000 pounds U3O8 at an average realized price of $122.16 (US$89.17) per pound U3O8 to generate $91.6 million (US$66.9 million) in gross proceeds – representing a gain of $64.1 million (or 233%) from the original purchase price.

As of June 30, 2026, the Company held 950,000 pounds U3O8 in investments in physical uranium and 145,926 pounds U3O8 of uranium concentrates inventory from its share of McClean Lake production, for total uranium holdings of approximately 1.1 million pounds U3O8.

Consistent with the construction financing needs for Phoenix, a total of 600,000 pounds U3O8 are committed for deliveries between the third quarter of 2026 and the second quarter of 2027.  Of these committed quantities, the sales price has been fixed for 350,000 pounds U3O8 with future gross proceeds expected to be US$33.3 million (average price of US$95.17/lb U3O8).  The remaining 250,000 pounds U3O8 of committed near-term sales are subject to market-related pricing to be fixed in reference to the time of delivery.  Approximately 500,000 pounds U3O8 in physical holdings and inventories remain uncommitted.  

  • **Active Winter Exploration Season Wraps up with Several Positive Results

**Winter exploration activities across Denison's extensive exploration project portfolio wrapped up during the second quarter.  During the six months ending June 30, 2026, exploration work was completed on a total of 18 Denison and partner-operated properties.  Over 50,000 metres of diamond drilling was completed in 140 drill holes across 10 properties, and geophysical surveys were conducted on 14 properties.

Notable uranium mineralization was reported from the Phoenix North target area on the Wheeler River property, as well as the Orano Canada Inc. ("Orano Canada") operated McClean Lake, Waterfound and Wolly properties, plus the Murphy Lake North and Darby properties operated by Cosa Resources ("Cosa"), and the Hatchet Lake property operated by Foremost Clean Energy ("Foremost").

With an extensive portfolio of 100%-owned and joint venture exploration properties, covering over 450,000 hectares, Denison has been one of the most active explorers in the Athabasca Basin region, while only having to fund approximately $10 million in exploration expenditures during the first half of 2026.

About Denison

Denison Mines Corp. was formed under the laws of Ontario and is a reporting issuer in all Canadian provinces and territories. Denison's common shares are listed on the Toronto Stock Exchange (the "TSX") under the symbol 'DML' and on the NYSE American exchange under the symbol 'DNN'.

Denison is a uranium mining, exploration and development company with interests focused in the Athabasca Basin region of northern Saskatchewan, Canada. The Company has an effective 95% interest in its flagship Wheeler River Uranium Project, which is the largest undeveloped uranium project in the infrastructure rich eastern portion of the Athabasca Basin region of northern Saskatchewan. In mid-2023, the Phoenix FS was completed for the Phoenix ISR mining operation, and an update to the 2018 Pre-Feasibility Study ("2018 PFS") was completed for the Gryphon deposit as a conventional underground mining operation (the "Gryphon Update"). Based on the respective studies, both deposits have the potential to be competitive with the lowest cost uranium mining operations in the world.

Permitting efforts for Phoenix commenced in 2019 and the required permits have been obtained to commence construction – including the July 2025 approval of the project's EA by the Province of Saskatchewan and the February 2026 federal approval of the EA and issuance of the Construction Licence.

Denison's interests in Saskatchewan also include a 22.5% ownership interest in the MLJV, which restarted mining with SABRE in 2025) and the McClean Lake uranium mill (currently utilizing a portion of its licensed capacity to process the ore from the Cigar Lake mine under a toll milling agreement), plus a 25.17% interest in the Midwest Main and Midwest A deposits held by the Midwest Joint Venture ("MWJV"), and a 70.55% interest in the Tthe Heldeth Túé ("THT") and Huskie deposits on the Waterbury Lake Property ("Waterbury"). The Midwest Main, Midwest A, THT and Huskie deposits are located within 20 kilometres of the McClean Lake mill. Taken together, the Company has direct ownership interests in properties covering ~457,000 hectares in the Athabasca Basin region.

Additionally, through its 50% ownership of JCU (Canada) Exploration Company, Limited ("JCU"), Denison holds further interests in various uranium project joint ventures in Canada, including the Millennium project (JCU, 30.099%), the Kiggavik project (JCU, 33.8118%) and Christie Lake (JCU, 34.4508%).

In 2024, Denison celebrated its 70th year in uranium mining, exploration, and development, which began in 1954 with Denison's first acquisition of mining claims in the Elliot Lake region of northern Ontario.

Technical Disclosure and Qualified Person

The technical information contained in this press release has been reviewed and approved by Chad Sorba, P.Geo., Denison's Vice President Technical Services & Project Evaluation, who is a Qualified Persons in accordance with the requirements of NI 43-101.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS 

Certain information contained in this press release constitutes 'forward-looking information', within the meaning of the applicable United States and Canadian legislation concerning the business, operations, and financial performance and condition of Denison. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as 'plans', 'expects', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates', or 'believes', or the negatives and/or variations of such words and phrases, or state that certain actions, events or results 'may', 'could', 'would', 'might' or 'will be taken', 'occur', 'be achieved' or 'has the potential to'.

In particular, this press release contains forward-looking information pertaining to the following: Denison's outlook, plans and objectives  with respect to Phoenix construction and the Company's other exploration, development and expansion programs, plans and objectives; expectations regarding uranium mining on the McClean Lake property; Denison's land position; expectations regarding Denison's joint venture ownership interests and the continuity of its agreements with its partners; Denison's plans with respect to its commercial activities, including its physical uranium holdings and other uranium sales transactions and the expected benefits thereof. Statements relating to 'mineral reserves' or 'mineral resources' are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral reserves and mineral resources described can be profitably produced in the future.

Forward looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Denison to be materially different from those expressed or implied by such forward-looking statements. For example, the results of the Denison's studies, including the Phoenix FS, and field work, may not be maintained after further testing or be representative of actual mining plans for the Phoenix deposit after further design and studies are completed. In addition, Denison may decide or otherwise be required to discontinue work at Wheeler River or other projects if it is unable to maintain or otherwise secure the necessary resources (such as testing facilities, capital funding, regulatory approvals, etc.) or operations are otherwise affected by regulatory restrictions or requirements.

Denison believes that the expectations reflected in this forward-looking information are reasonable, but no assurance can be given that these expectations will prove to be accurate, and results may differ materially from those anticipated in this forward-looking information. For a discussion in respect of risks and other factors that could influence forward-looking events, please refer to the factors discussed under the heading 'Risk Factors' in this MD&A. These factors are not, and should not be construed as being, exhaustive.  Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking information contained in this press release is expressly qualified by this cautionary statement. Any forward-looking information and the assumptions made with respect thereto speaks only as of the date of this press release. Denison does not undertake any obligation to publicly update or revise any forward-looking information after the date of this press release to conform such information to actual results or to changes in Denison's expectations except as otherwise required by applicable legislation.

SOURCE Denison Mines Corp.

Prompts

Denison Mines Corp (ticker DNN), listed in Canada.

Company History

Date Change Detail
Dec 31, 2024 Reporting currency Its US reports are in CAD instead of USD from this period. Earlier figures are shown in CAD, converted at each period end's exchange rate.
Dec 18, 2006 Renamed INTERNATIONAL URANIUM CORP → DENISON MINES CORP.

ETFs Holding Denison Mines Corp

ETF Weight in ETF Shares Market value As of
CSNR 0.60% 177,554 $ 543.315K Jun 30, 2026
AIPO 0.38% 1,427,700 $ 2.984M Nov 13, 2026
RAAX 0.32% 1,675,596 $ 4.355M Sep 30, 2026
CCSO 0.19% 42,170 $ 80.545K Nov 17, 2026

Securities

Ticker Type Class Market Exchange Last price Price date
DNN Common share — US nyse 2.59 USD 2026-09-30
DML canonical Common share — CA tsx — —