B2Gold Corp is an international gold producer engaged in the acquisition, development, exploration, and operation of mineral properties with a primary focus on gold deposits. The company conducts mining operations, exploration, and drilling campaigns to define and develop mineral resources and reserves, with the intention of constructing and operating mines on these properties. Its principal product is gold, which is refined to market delivery standards and sold to various gold bullion dealers or refiners at market prices, with benchmark prices generally based on London gold market quotations. The company operates producing gold mines in Canada, Mali, Namibia, and the Philippines, and holds development and exploration projects in Colombia and other regions. Its main producing assets include the Fekola Complex in Mali, the Masbate Gold Project in the Philippines, the Otjikoto Mine in Namibia, and the Goose Mine in Canada. Development projects include the Back River Project in Canada and the Gramalote Project in Colombia. The company also engages in exploration activities in various other countries. B2Gold was founded in 2007.

Summarised from the annual information form, filed Mar 2026

Industry Gold Homepage b2gold.com
Sector Basic Materials IR page b2gold.com/investors
Tags
gold mining, mineral exploration, mineral development, bullion sales, international operations, Fekola Complex, Masbate Gold Project, Otjikoto Mine, Goose Mine, Back River Project, Gramalote Project, Filminera Resources Corporation, Philippine Gold Processing & Refining Corp., Mineworkers Union of Namibia, Global Affairs Canada, Cowater International, FEMA Project, Goungoubato Agricultural Project, Bafarato Agricultural Project, Kitikmeot Social Investment Plan, More Than Mining Fund, Sembradores de Vida, Nus Symphonic Band, Back River Inuit Training Plan, Regional Wealth Creation Fund, Inuit Impact & Benefit Agreement, Fekola Community Development Plan, Livelihood Restoration Plan, Social Development and Management Program, Corporate Social Investment, Ethics Helpline
Press page —

Metrics

Valuation  
Market cap —
Market cap (USD) —
P/E —
PEG —
P/BV —
P/S —
P/OCF —
P/FCF —
Dividend yield —
Turnover / mcap —
Returns  
ROE 12.0%
ROI 11.0%
ROIC 11.0%
Profit margin 13.1%
Growth  
Revenue growing Yes
Profits growing Yes
Revenue up 3y No
Revenue up 5y No
Earnings growth 3y (net profit CAGR) 16.7%
Quality  
Profitable Yes
Margin expanding Yes
Buying back stock —
Diluting (TTM) —
Debt/Equity —
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 0
Quality score 66.7%
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021 FY 2020 FY 2019 FY 2018
Revenue 3.061B 1.902B 1.934B 1.733B 1.762B 1.789B 1.156B 1.051B
Net profit 401.908M -629.891M 10.097M 252.873M 420.065M 628.063M 293.382M 28.938M

Operating KPIs — quarters

KPI Sep 24 Dec 24 Mar 25 Jun 25 Sep 25 Dec 25 Mar 26 Jun 26
Gold production (ounces) 78,207 84,015 192,752 126,361 146,883 163,720 237,763 116,281
↳ YoY growth -39.3% -41.3% -14.6% +13.2% +87.8% +94.9% +23.4% -8.0%
All-in sustaining cost (USD) 2,287 2,237 1,937 1,721 1,678 1,903 1,964 2,289
↳ YoY growth +81.4% +100.1% +43.9% +36.8% -26.6% -14.9% +1.4% +33.0%
Reported Nov 7, 2024 Feb 20, 2025 May 8, 2025 Aug 8, 2025 Nov 6, 2025 Feb 19, 2026 May 6, 2026 Aug 7, 2026

Operating KPIs — years

KPI Dec 2021 Dec 2022 Dec 2023 Dec 2024 Dec 2025
Gold production (ounces) 567,795 598,661 590,243 392,946 530,769
↳ YoY growth +5.4% -1.4% -33.4% +35.1%
All-in sustaining cost (USD) 765 867 1,143 1,723 1,804
↳ YoY growth +13.3% +31.8% +50.7% +4.7%
Reported Feb 23, 2023 Feb 23, 2023 Feb 22, 2024 Feb 20, 2025 Feb 19, 2026

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

October 14, 2026

Download(opens in new window)PDF

VANCOUVER, British Columbia, Oct. 14, 2026 (GLOBE NEWSWIRE) -- B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) (“B2Gold” or the “Company”) will release its third quarter 2026 financial and operational results after the North American markets close on Wednesday, November 4, 2026.

B2Gold executives will host a conference call to discuss the results on Thursday, November 5, 2026, at 9:00 am PCT / 11:00 am ET. To participate in the live call, please use one of the following methods:

  • Toll-free in U.S. and Canada: +1 (833) 821-2803
  • International: +1 (647) 846-2419
  • Webcast: access link

The conference call will be available for playback for two weeks by dialing toll-free in the U.S. and Canada: +1 (855) 669-9658, replay access code 9332075. All other callers: +1 (412) 317-0088, replay access code 9332075.

About B2Gold

B2Gold is a responsible international gold producer headquartered in Vancouver, Canada. B2Gold has operating gold mines in Canada, Mali, Namibia and the Philippines, and numerous development and exploration projects in various countries.

Source: B2Gold Corp.                

September 28, 2026

Download(opens in new window)PDF

VANCOUVER, British Columbia, Sept. 28, 2026 (GLOBE NEWSWIRE) -- B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) (“B2Gold” or the “Company”) is pleased to provide an operational update for the Goose Mine and announce positive results from its ongoing Back River Gold District exploration drilling program in Nunavut, Canada. All dollar figures are in United States dollars unless otherwise indicated.

Goose Mine Operations Highlights

  • New mobile crushing plant commissioned in August 2026.
  • Mobile crushing exceeded an average of 3,000 tonnes per day (“tpd“) of ore from mid-August, in-line with plan.
  • Fixed plant crushing throughput is expected to reach a sustained average of 3,200 tpd beginning in October 2026 following completion of planned work on the fixed crushing plant, including Phase 1 upgrades and repairs related to the fire damage.
  • Goose Mine is on track to achieve annual production guidance of 170,000 to 200,000 ounces of gold in 2026.

Goose Mine Exploration Highlights

  • Infill drill results at Llama confirm interpretation of high-grade mineralization and increase confidence in the current Inferred Mineral Resources below the open pit. Highlight intersections include (core length):

    • Drill hole 26GSE749Z2 returned 19.12 grams per tonne (“g/t”) gold over 21.23 meters (“m”) from 463.85 m;
    • Drill hole 26GSE749 returned 44.61 g/t gold over 4.65 m from 473.50 m;
    • Drill hole 26GSE746Z2 returned 21.72 g/t gold over 10.60 m from 399.05 m;
    • Drill hole 26GSE748Z1B returned 44.03 g/t gold over 3.53 m from 354.40 m; and
    • Drill hole 26GSE747Z2B returned 10.59 g/t gold over 4.95 m from 357.05 m.
  • New discovery of high-grade gold mineralization beyond the western limb of the Nuvuyak structure at Goose Main (core length):

    • Drill hole 26GSE750Z2 returned 10.94 g/t gold over 9.95 m from 1,195.90 m (Tattuk zone exploration hole).
  • Infill and extension drill results at Nuvuyak (Goose Main) show continuity of high-grade mineralization and opportunity to lengthen the down plunge extents of known high-grade mineralization. Highlight intersections include (core length):

    • Drill hole 26GSE750 returned 11.88 g/t gold over 6.90 m from 1,048.30 m; and
    • Drill hole 26GSE753Z1 returned 8.74 g/t gold over 7.60 m from 806.00 m.

Back River Gold District Exploration Highlights

  • Infill drill results at the Locale 1 deposit at the George Project demonstrate continuity of high-grade mineralization in the Inferred Mineral Resource. Highlight intersections include (core length):
    • Drill hole 26GRL232 returned 15.72 g/t gold over 7.85 m from 227.00 m;
    • Drill hole 26GRL232Z1 returned 29.58 g/t gold over 3.65 m from 265.80 m;
    • Drill hole 26GRL236 returned 19.49 g/t gold over 6.75 m from 44.30 m;
    • Drill hole 26GRL239 returned 26.49 g/t gold over 9.40 m from 38.60 m; and
    • Drill hole 26GRL245Z1 returned 23.63 g/t gold over 5.75 m from 337.05 m.

Mike Cinnamond, President and CEO of B2Gold, said, “We are very pleased to provide an operational update for the Goose Mine that demonstrates the significant progress to achieve temporary ore crushing capacity at 3,000 tpd following the fire in April, while progressing the upgrades and repairs to the fixed crushing plant, according to plan. The successful commissioning of the new mobile crushing plant and continued advancement of the Phase 1 upgrades are a testament to the dedication and hard work of our operations, maintenance and project teams. With the crusher repairs and upgrades on track, we remain confident in our ability to achieve 170,000 to 200,000 ounces of gold production at Goose this year and continue to position the site for improved long-term performance and operating flexibility.

Our 2026 Back River Gold District exploration program yielded strong results from the Goose Mine and regional program, aiding our deposit knowledge and mine planning, district-wide target generation, and conversion of near-mine resources. At the Goose Mine, drilling at the Llama deposit and Nuvuyak structure contributed to our goal to infill Mineral Resources, demonstrated the potential to further extend mine life, and identified a prospective new zone, Tattuk, for follow up drilling. At the George Project, strong results from infill drilling strengthened confidence in the continuity of high-grade mineralization that will support resource conversion. We look forward to building upon the results of the 2026 program and advancing opportunities identified district-wide.”

Goose Mine Operations Update

Mobile Crusher Update

As announced on August 6, 2026, the Company purchased and received a new mobile crushing plant to supplement existing crushing capacity while repairs to the fixed crushing plant, as a result of the fire announced earlier in the year, are completed. The new mobile crushing plant arrived on site in July and was commissioned in August. Following commissioning of the new mobile crushing plant, total mobile crushing ore throughput exceeded an average of 3,000 tpd since mid-August, in line with plan. The capital cost for the additional crushing plant and supporting equipment was approximately $16 million.

Phase 1 upgrades to the fixed crushing plant, which include the addition of a run-of-mine mass-flow bin and apron feeder, a new larger jaw crusher and rock breaker, are underway and on track to be commissioned mid-October, the same time repairs from the fire to the conveyor belt are expected to be completed. The Goose fixed crushing plant is expected to have an average daily capacity of 3,200 tpd following the commissioning of the Phase 1 upgrades, which are estimated to incur a total cost of $11 million.

The Company plans to continue to use the new mobile crushing plant (~3,000 tpd) alongside the fixed crushing plant (~3,200 tpd) through October and as weather permits through the winter, to feed the mill and build a stockpile of crushed ore. A semi-permanent enclosure is being erected around the mobile crushing plant to facilitate continued operations of the mobile crusher during the winter months. Phase 2 upgrades to the fixed crushing plant are scheduled for the first half of 2027, at which time the fixed crushing plant is expected to be down for up to 10 weeks while upgrades are completed. The Company expects to build sufficient crushed ore stockpiles prior to the Phase 2 shutdown and utilize the new mobile crushing plant during the upgrade, so that mill operations are not impacted during the shutdown period. Phase 2 crusher upgrades include the installation of larger secondary/tertiary cone crushers, new surge bins with feeders to optimize crusher performance, and upgraded conveyors to support higher throughput. Once complete, the Phase 2 upgrades are expected to increase average crushing capacity to design throughput of 4,000 tpd. While initially acquired to mitigate the impacts of the crusher fire, the new mobile crushing plant will remain on site and be used to provide long-term operational flexibility and additional crushing capacity beyond the completion of the fixed crushing plant upgrades.

Annual Guidance

With the new mobile crusher commissioned and Phase 1 upgrades progressing as planned, the Company remains on track to deliver annual production guidance of 170,000 to 200,000 ounces of gold from the Goose Mine in 2026. Third quarter of 2026 gold production is expected to be broadly in line with first quarter production levels, and fourth quarter of 2026 production is expected to be the strongest quarter of the year, driven by a full quarter of higher tonnes milled and strong mill feed grade.

2026 Back River Gold District Exploration Program Overview

The 2026 exploration program is supported by a budget of $51 million, and includes over 35,000 m of drilling, and regional exploration activities. The program prioritized supporting future mine planning, infill drilling for resource conversion, the identification of new zones of mineralization for follow-up exploration and increasing deposit knowledge. As of August 31, the 2026 Back River Gold District exploration program had completed 75% of the 2026 campaign with a total of 27,493 m of drilling.

More than half of the 2026 exploration budget is focused on activities located at the Goose Mine to infill Inferred Mineral Resources at the Llama deposit and Nuvuyak zone, as well as targeting extensions of known mineralization at the Nuvuyak zone.

The 2026 regional exploration program is focused on mapping, prospecting, and till sampling on the George Project (including the Locale 1 deposit), Ailiruk, Goose, Boot, Needle, and Beech targets and makes up the remainder of the 2026 exploration budget at the Back River Gold District. The goal of the regional work is to further define resources at the Locale 1 deposit, identify new zones of mineralization amenable to open pit mining methods, and follow up on targets defined during the 2025 summer regional exploration program.

All drill results are as of August 31, 2026, unless otherwise noted. Full composite tables detailing drill intercept assay results are provided at the end of this release.

Goose Mine Exploration

The Goose Mine comprises five main deposits: Umwelt, Llama, Llama Extension, Goose Main and Echo, and has defined Indicated Mineral Resources of 15.91 million tonnes grading 7.40 g/t gold totaling 3.79 million ounces (inclusive of Mineral Reserves) and Inferred Mineral Resources of 9.31 million tonnes grading 7.63 g/t totaling 2.28 million ounces. Significant drill hole locations from the 2026 Goose Mine exploration program are shown on the map in Figure 1 and Figure 2.

_Figure 1. Goose Mine drill hole locations plan view.
_Figure 1.

_Figure 2. Goose Mine drill hole locations long section with significant intersections labelled.
_Figure 2.

At the Llama deposit, 28 holes totaling 7,255 m were drilled year-to-date to infill the Inferred Mineral Resources down plunge from the Llama open pit. Results confirm current interpretations of high-grade mineralization with results up to 19.12 g/t gold over 21.23 m from 463.85 m in drill hole 26GSE749Z2 (Figure 3). All assay results from the 2026 drill campaign at Llama have now been received, providing key inputs for upcoming mine-planning work.

The LX Gap is an approximately 300 m long portion of the southeasterly plunging Llama deposit that to date has seen insufficient drilling to confirm the continuity of high-grade mineralization along the entirety of the known 2,000 m of the deposit. The high-grade intersections flanking LX Gap impart confidence in continuity and promote LX Gap as a drill target for the 2027 drilling campaign.

_Figure 3. Llama Deposit long section (facing northeast). Significant intersections are labelled and pierce points for drillholes disclosed in this release are outlined in black.
_Figure 3.

At Goose Main, 16 holes totaling 6,951 m were drilled year-to-date, focused on infill drilling and exploring extensions down plunge and down dip of known mineralization in the Nuvuyak zone. Infill drilling is ongoing with assay results still pending for 10 holes. Results from the 2025 exploration program suggested mineralization continued down plunge of Nuvuyak, and drill hole 26GSE750Z2 was extended to test the geological interpretation of the iron formation hosting the gold mineralization and to evaluate Nuvuyak’s projected continuation down plunge. Results from that hole confirmed high-grade mineralization, with 10.94 g/t gold over 9.95 m from 1,195.90 m on the western limb of the fold. This new discovery, named Tattuk, is approximately 150 m down plunge from Nuvuyak and presents a new opportunity for future resource additions (Figure 4).

_Figure 4. Goose Main long section (facing north). Significant intersections are labelled and pierce points for drillholes disclosed in this release are outlined in black.
_Figure 4.

Other near-mine exploration targets, including Hackles and Goose Tail, were tested in 2026 with a total of 1,178 m drilled in six drill holes. At the Goose Tail target, 850 m southeast of Goose Main, drilling from three drill holes tested the potential for a small open pit resource target. Assay results are pending for the three 2026 drill holes.

Significant 2026 drill results from the Goose Mine exploration drilling include:

Hole ID****1 Area Zone From (m) To (m) Length **(m)**2 Au (g/t) Au (g/t) Capped****3
26GSE746Z2 Goose Llama 399.05 409.65 10.60 21.72 16.79
26GSE749 Goose Llama 473.50 478.15 4.65 44.61 32.15
26GSE749Z2 Goose Llama 463.85 485.08 21.23 19.12 15.44
26GSE750 Goose Nuvuyak 1,048.30 1,055.20 6.90 11.88 11.88
26GSE750Z2 Goose Tattuk 1,195.90 1,205.85 9.95 10.94 10.54
26GSE753Z1 Goose Nuvuyak 806.00 813.60 7.60 8.74 8.74

Notes:

  1. Full composite tables containing the drill intercept assays from the Goose Mine exploration drilling are located at the end of this release.
  2. Composite intervals represent core length, not true width, and were calculated using a 3.0 g/t gold cut-off grade and may include up to 2.0 m of internal dilution.
  3. Capped at 50 g/t gold.

2026 Regional Exploration Program

The George Project, situated 60 kilometers (“km”) northwest of the Goose Mine (Figure 5), has an Indicated Mineral Resource estimate of 1.66 million tonnes grading 7.89 g/t gold for a total of 420,000 ounces of gold and an Inferred Mineral Resource estimate of 4.19 million tonnes grading 8.98 g/t gold for a total of 1.2 million ounces of gold, including Locale 1 Inferred Mineral Resource estimate of 1.15 million tonnes grading 10.25 g/t gold for a total of 380,000 ounces of gold.

_Figure 5. Back River Gold District Property Overview.
_Figure 5.

Infill drill results from the 2026 George Project and drilling at Locale 1 confirmed the continuity of high-grade gold mineralization in the Inferred Mineral Resource (Figure 6). In addition, approximately 2,279 m was drilled in 15 holes at the George Project, Dragon South, Oar, Rainbow Row, and Spoon targets, focusing on identifying new zones of shallow mineralization that could be amenable to open pit methods. At the Dragon South zone, 1,134 m over 6 holes followed up encouraging 2025 drill results of 10.42 g/t gold over 5.65 m from 10.75 m in drill hole 25GRL224. Assays from the 2026 program are pending.

_Figure 6. Locale 1 (George Project) Drill Hole Locations.
_Figure 6.

Significant 2026 drill results from the Locale 1 zone in the George Project include:

Hole ID 1 Area Zone From (m) To (m) Length **(m)**2 Au (g/t) Au (g/t) Capped****3
26GRL232 George Locale 1 227.00 234.85 7.85 15.72 15.72
26GRL236 George Locale 1 44.30 51.05 6.75 19.49 19.49
26GRL239 George Locale 1 38.60 48.00 9.40 26.49 18.62
26GRL243 George Locale 1 6.51 10.11 3.60 23.20 16.42
26GRL245Z1 George Locale 1 337.05 342.80 5.75 23.63 23.63

Notes:

  1. Full composite tables containing the drill intercept assays from the George Project Locale 1 drilling program are located at the end of this release.
  2. Composite intervals represent core length, not true width, and were calculated using a 4.0 g/t gold cut-off grade and may include up to 2.0 m of internal dilution.
  3. Capped at 50 g/t gold.

At the Back River Gold District Regional targets, Boot and Needle, 2,142 m of drilling from 12 holes was completed following up on prospective 2025 exploration program results. At the Boot property, situated 12 km northeast of Goose Mine, 1,693 m was drilled across nine drill holes at the Ayers, Boot Laces, Hammer, and Rooster targets following up encouraging results from the 2025 exploration program. Assay results are still pending for four holes from the Hammer and Rooster zones. At the Needle property, situated 60 km southwest of the Goose Mine, approximately 450 m were drilled with the program ongoing and assays pending. Results to date in 2026 have not returned any significant values.

Surface Exploration Program

Regional target definition was supplemented by an integrated surface exploration program comprised of mapping, prospecting, and the collection of 2,927 till samples, 92 channels (296 samples), and 1,059 rock samples from nine properties including Ailiruk, Goose South, Boot, Boulder, George, Del, Needle, Beech, and Wishbone. Channel sample results from Ailiruk are encouraging and include up to 3.94 g/t gold over 6.3 m. In addition, shallow Rotary Air Blast (“RAB”) drilling was carried out over four areas with 183 holes drilled and 386 samples collected. Results of RAB drilling will aid in identifying prospective lithology below glacial till cover and guide future efforts towards mineralized bedrock. The completed surface exploration has generated additional regional and near-mine targets for further evaluation and drill testing in 2027.

Drill Intercept Assays – Composite Tables

2026 drill results from the Llama deposit at the Goose Mine include:

Hole ID Area Zone Including/ and From (m) To (m) **Length (m)**2 Au (g/t) Au (g/t) Capped****1
26GSE744 Goose Llama 402.20 403.06 0.86 36.10 36.10
408.40 410.13 1.73 32.96 23.46
26GSE744Z1 Goose Llama 359.50 365.50 6.00 9.61 9.61
370.35 372.80 2.45 24.12 22.54
incl. 370.93 371.50 0.57 56.80 50.00
26GSE744Z2 Goose Llama 407.80 409.15 1.35 12.29 12.29
26GSE744Z3 Goose Llama 325.45 332.50 7.05 8.51 8.51
incl. 327.65 330.06 2.41 16.88 16.88
26GSE745 Goose Llama 436.77 452.10 15.33 1.00 1.00
26GSE745Z1 Goose Llama 349.25 351.50 2.25 9.37 9.37
26GSE745Z2 Goose Llama 438.15 440.00 1.85 23.09 23.09
444.10 445.50 1.40 21.84 21.84
26GSE745Z3 Goose Llama 432.10 433.10 1.00 37.30 37.30
452.90 454.70 1.80 9.15 9.15
26GSE746 Goose Llama 310.57 317.56 6.99 1.07 1.07
337.19 338.84 1.65 6.72 6.72
incl. 337.19 337.69 0.50 15.90 15.90
26GSE746Z1 Goose Llama 336.06 336.75 0.69 30.00 30.00
26GSE746Z2 Goose Llama 399.05 409.65 10.60 21.72 16.79
incl. 401.95 404.90 2.95 65.76 48.04
26GSE746Z2B Goose Llama NSV - Abandoned
26GSE746Z2C Goose Llama 336.55 339.00 2.45 7.78 7.78
incl. 338.00 338.50 0.50 17.50 17.50
373.40 375.70 2.30 5.84 5.84
26GSE746Z3 Goose Llama 327.10 327.70 0.60 8.06 8.06
26GSE747 Goose Llama 101.22 104.24 3.02 1.84 1.84
26GSE747Z1 Goose Llama NSV
26GSE747Z2 Goose Llama NSV - Abandoned
26GSE747Z2B Goose Llama 349.65 351.80 2.15 10.26 10.26
357.05 362.00 4.95 10.59 10.59
incl. 357.05 358.10 1.05 20.60 20.60
26GSE748 Goose Llama 351.94 355.25 3.31 9.72 9.72
373.70 375.70 2.00 15.69 15.69
384.65 386.96 2.31 25.18 18.35
incl. 386.19 386.96 0.77 70.50 50.00
26GSE748Z1 Goose Llama NSV - Abandoned
26GSE748Z1B Goose Llama 340.82 345.14 4.32 3.45 3.45
354.40 357.93 3.53 44.03 31.06
372.58 375.25 2.67 11.49 11.49
387.97 388.59 0.62 271.00 50.00
26GSE748Z2 Goose Llama 371.52 374.75 3.23 16.78 16.78
26GSE748Z3 Goose Llama 266.50 277.80 11.30 5.19 5.19
26GSE748Z4 Goose Llama 285.10 289.55 4.45 5.46 5.46
26GSE749 Goose Llama 417.10 418.10 1.00 34.30 34.30
450.00 452.15 2.15 16.50 16.50
473.50 478.15 4.65 44.61 32.15
26GSE749Z1 Goose Llama 490.95 493.40 2.45 16.59 16.59
incl. 490.95 491.65 0.70 45.20 45.20
26GSE749Z2 Goose Llama 421.25 422.30 1.05 33.64 33.17
463.85 485.08 21.23 19.12 15.44
26GSE749Z3 Goose Llama 314.35 316.40 2.05 3.79 3.79
509.60 516.60 7.00 1.07 1.07

Notes:

  1. Capped at 50 g/t gold.

  2. _Goose composite intervals represent core length, not true width, and were calculated using a 3.0 g/t gold cut-off grade and may include up to 2.0 m of internal dilution. True width undetermined.

    _

2026 drill results from the Nuvuyak zone within the Goose Mine include:

Hole ID Area Zone Including/ and From (m) To (m) **Length (m)**2 Au (g/t) Au (g/t) Capped****1
26GSE750 Goose Nuvuyak 995.65 999.90 4.25 4.39 4.39
incl. 998.95 999.90 0.95 12.25 12.25
1048.30 1055.20 6.90 11.88 11.88
incl. 1053.65 1055.20 1.55 23.79 23.79
26GSE750Z1 Goose Nuvuyak 995.75 1000.90 5.15 2.09 2.09
1019.80 1027.65 7.85 1.92 1.92
26GSE750Z1W1 Goose Nuvuyak 1019.95 1027.80 7.85 1.30 1.30
26GSE750Z2 Goose Nuvuyak 1082.20 1086.05 3.85 11.42 11.42
Tattuk 1195.90 1205.85 9.95 10.94 10.54
incl. 1197.45 1200.80 3.35 24.79 23.60
26GSE753 Goose Hook 414.35 422.40 8.05 1.02 1.02
475.83 480.15 4.32 1.55 1.55
Nuvuyak 815.80 820.40 4.60 10.21 10.21
incl. 818.90 819.60 0.70 27.90 27.90
26GSE753Z1 Goose Nuvuyak 806.00 813.60 7.60 8.74 8.74
incl. 811.90 813.60 1.70 27.36 27.36
814.45 817.40 2.95 0.97 0.97

Notes:

  1. Capped at 50 g/t gold.

  2. _Goose composite intervals represent core length, not true width, and were calculated using a 3.0 g/t gold cut-off grade and may include up to 2.0 m of internal dilution. True width undetermined.

    _

2026 drill results from the Locale 1 zone in the George Project include:

Hole ID Area Zone Including/ and From (m) To (m) **Length (m)**2 Au (g/t) Au (g/t) Capped****1
26GRL231 George Locale 1 269.88 272.90 3.02 12.05 12.05
incl. 271.86 272.90 1.04 24.74 24.74
283.65 287.13 3.48 7.46 7.46
incl. 286.25 287.13 0.88 19.10 19.10
26GRL231Z1 George Locale 1 258.40 262.90 4.50 9.01 9.01
incl. 258.40 259.40 1.00 26.00 26.00
26GRL231Z2 George Locale 1 304.05 304.95 0.90 13.75 13.75
309.20 310.90 1.70 96.32 43.08
26GRL231Z3 George Locale 1 291.29 293.00 1.71 8.54 8.54
26GRL232 George Locale 1 227.00 234.85 7.85 15.72 15.72
incl. 230.30 233.15 2.85 27.98 27.98
238.10 238.85 0.75 88.10 50.00
26GRL232Z1 George Locale 1 265.80 269.45 3.65 29.58 29.58
26GRL232Z2 George Locale 1 226.96 231.56 4.60 1.38 1.38
243.54 244.06 0.52 9.47 9.47
26GRL232Z3 George Locale 1 254.90 259.78 4.88 11.53 11.53
incl. 254.90 256.85 1.95 22.21 22.21
26GRL233 George Locale 1 219.52 220.30 0.78 21.50 21.50
26GRL233Z1B George Locale 1 216.55 220.55 4.00 6.55 6.55
incl. 218.60 219.60 1.00 11.70 11.70
26GRL233Z2C George Locale 1 223.90 226.50 2.60 17.02 17.02
248.45 251.70 3.25 4.65 4.65
26GRL234 George Locale 1 60.20 69.05 8.85 5.24 5.24
incl. 60.20 61.70 1.50 16.63 16.63
26GRL235 George Locale 1 61.95 64.40 2.45 7.51 7.51
26GRL236 George Locale 1 44.30 51.05 6.75 19.49 19.49
26GRL237 George Locale 1 59.80 62.20 2.40 18.26 18.26
incl. 60.60 61.55 0.95 36.10 36.10
26GRL238 George Locale 1 NSV
26GRL239 George Locale 1 38.60 48.00 9.40 26.49 18.62
incl. 39.40 42.55 3.15 57.84 34.35
26GRL240 George Locale 1 26.75 30.00 3.25 16.76 16.76
26GRL241 George Locale 1 34.00 36.22 2.22 6.69 6.69
incl. 34.00 34.55 0.55 23.00 23.00
26GRL242 George Locale 1 NSV - Abandoned
26GRL242W1 George Locale 1 310.01 311.93 1.92 37.72 27.87
26GRL242Z1 George Locale 1 319.50 322.66 3.16 11.98 11.98
26GRL242Z2 George Locale 1 285.61 288.60 2.99 8.26 8.26
incl. 285.61 286.15 0.54 22.20 22.20
26GRL242Z3 George Locale 1 311.10 313.20 2.10 21.17 21.17
26GRL242Z4 George Locale 1 288.30 290.65 2.35 14.31 14.31
incl. 288.30 289.15 0.85 31.40 31.40
26GRL243 George Locale 1 6.51 10.11 3.60 23.20 16.42
incl. 8.82 10.11 1.29 53.73 34.81
26GRL244 George Locale 1 228.38 230.90 2.52 5.36 5.36
26GRL244Z1 George Locale 1 252.78 255.56 2.78 12.20 12.20
26GRL244Z2 George Locale 1 NSV
26GRL245 George Locale 1 334.00 338.65 4.65 7.54 7.54
incl. 335.85 336.85 1.00 20.30 20.30
341.60 343.75 2.15 13.07 13.07

Notes:

  1. Capped at 50 g/t gold.

  2. _George composite intervals represent core length, not true width, and were calculated using a 4.0 g/t gold cut-off grade and may include up to 2.0 m of internal dilution. True width undetermined.

    _

(opens in new window)

September 04, 2026

Download this Story(opens in new window)

Since partnering with Eduvision in 2018, B2Gold Namibia has played an important role in expanding access to quality digital education for learners across the country. What began as a shared vision to bridge educational gaps has grown into a long-standing partnership that continues to deliver meaningful results for schools, teachers, and students.

The Eduvision Project allows teachers to use SMARTboards to beam lessons to schools in remote areas via a dedicated satellite link, reaching several classrooms simultaneously.

The impact of this collaboration was clearly reflected at the start of 2026 when two B2Gold-supported schools, Epukiro Post 3 Secondary School and Kandjimi Murangi Secondary School, achieved exceptional results in Namibia's 2025 national examinations. Epukiro Post 3 ranked fourth nationally, while Kandjimi Murangi secured eighth place. These outstanding achievements not only highlight the dedication of learners and educators but also demonstrate the value of sustained investment in educational resources and digital learning opportunities.

In March, representatives from Eduvision welcomed a delegation from B2Gold, which included the Deputy Minister of Education, Innovation, Sports, Arts and Culture, Honourable Dino Ballotti, to Ombili Primary School in Otjiwarongo, where they witnessed firsthand the company's significant investment in education. Eduvision praised B2Gold's commitment to creating lasting opportunities for learners, describing its contributions as a legacy that will benefit future generations. During the visit, excitement also grew around the announcement that Coblenz Secondary School in the Otjozondjupa Region would become the latest school to benefit from B2Gold's support.

That commitment continued in May with the formal addition of Coblenz Secondary School to the Eduvision project. At the same time, B2Gold recognized the academic excellence of Epukiro Post 3 and Kandjimi Murangi by funding a second set of digital learning equipment for each school. The additional technology was warmly received by school leadership and has further enhanced teaching and learning opportunities for students. Comprehensive training was provided to educators to ensure they could fully utilize the digital learning system, helping maximize the benefits of the new technology in classrooms. The additional interactive digital boards installed at both Epukiro Post 3 and Kandjimi Murangi were also quickly embraced and are already being used extensively by teachers and learners.

A major milestone was celebrated on July 28 when Coblenz Combined School officially inaugurated its new digital classroom. The facility includes a Clevertouch interactive board, reliable internet connectivity, access to an extensive library of recorded lessons, and 40 learner desks and chairs. Together, these resources are creating new opportunities for innovative teaching and learning while helping ensure that students have access to high-quality educational content regardless of location.

For Eduvision, the inauguration represented more than the opening of a classroom. It was another chapter in a partnership that has helped transform the educational experience for thousands of learners across Namibia. As Eduvision's first corporate partner, B2Gold believed in the organization's vision from the very beginning, investing not only in technology and infrastructure but also in the potential of Namibia's young people.

Today, eight years after the partnership began, B2Gold remains one of Eduvision's most loyal and committed supporters. Through ongoing investments in digital education, school infrastructure, and learner success, the Company continues to help create opportunities that extend far beyond the classroom.

Together, B2Gold and Eduvision are demonstrating how strong partnerships can empower communities, strengthen educational outcomes, and help build a brighter future for Namibia's next generation.

B2Gold delegation, including Deputy Minister of Education, Innovation, Sports, Arts and Culture, Honourable Dino Ballotti, visit Ombili Primary School e-learning facility

Deputy Minister of Education, Innovation, Sports, Arts and Culture, Honourable Dino Ballotti explores the Eduvision SMARTboard at Ombili Primary School.

Multimedia Files:

View all our stories

B2Gold Corp.

CORPORATE OFFICE

Park Place, Suite 3400
666 Burrard Street
Vancouver, British Columbia
Canada V6C 2X8

© 2026 B2Gold Corp. - All rights reserved.

Powered By Q4 Inc. 5.191.0.1 (opens in new window)   Designed by Macrae Creative.

Prompts

B2Gold Corp (ticker BTG), listed in Canada.

ETFs Holding B2Gold Corp

ETF Weight in ETF Shares Market value As of
GDMN 0.90% 362,013 $ 1.984M Aug 31, 2026
DISV 0.66% 6,801,622 $ 33.734M Nov 12, 2026
AVDV 0.57% 23,422,874 $ 110.886M Nov 16, 2026
CCNR 0.24% 277,385 $ 1.04M Jul 31, 2026
SYZ 0.22% 39,572 $ 147.999K Jun 30, 2026
AVDS 0.20% 152,791 $ 723.328K Nov 16, 2026
DFIS 0.19% 2,258,945 $ 11.198M Nov 12, 2026
RFDI 0.18% 80,587 $ 301.802K Jul 31, 2026
DXIV 0.15% 71,094 $ 352.587K Nov 12, 2026
AVSD 0.12% 91,717 $ 434.197K Nov 16, 2026
AVIV 0.10% 424,042 $ 2.007M Nov 16, 2026
AVDE 0.09% 3,873,770 $ 18.339M Nov 16, 2026
DFIC 0.07% 2,205,762 $ 10.939M Nov 12, 2026
FTLS 0.07% 398,803 $ 0.00 Nov 16, 2026
DFAX 0.05% 1,224,377 $ 6.061M Nov 12, 2026
DFAI 0.04% 1,509,347 $ 7.471M Nov 12, 2026
DFSI 0.02% 56,757 $ 281.367K Nov 12, 2026

Securities

Ticker Type Class Market Exchange Last price Price date
BTG Common share — US nyse 5.22 USD 2026-09-30
BTO canonical Common share — CA tsx — —