Anfield Energy Inc. is an energy metals exploration, development, and near-term production company focused on uranium and vanadium assets in the United States. Its business segments include the acquisition and development of conventional uranium and vanadium projects, as well as the operation of processing infrastructure. The company's main assets are the Shootaring Canyon Mill, a licensed conventional uranium mill in Utah, and several mining projects including the West Slope Project, the Velvet-Wood Project, the Slick Rock Project, and the Marquez-Juan Tafoya project in New Mexico. It also holds surface stockpiles of uranium and has acquired DOE leases in Colorado. The company serves the domestic U.S. market, operating primarily in Utah, Colorado, Arizona, and New Mexico. Notable subsidiaries include Anfield Energy US Corp., Anfield Precious Metals Inc., Anfield Resources Holding Corp., ARH Wyoming Corp., Highbury Resources Inc., Neutron Energy Inc., and BRS Inc., which it acquired in 2025. The company was incorporated in 1986 under the name Merritech Development Corporation and has undergone several name changes, including Equinox Exploration Corp. and Anfield Resources Inc., before becoming Anfield Energy Inc. in 2017.

Summarised from the annual information form, filed Mar 2026

Industry Other Precious Metals & Mining Homepage anfieldenergy.com
Sector Basic Materials IR page anfieldenergy.com/investors
Tags
uranium, vanadium, mining, mill operations, exploration, conventional mining, in-situ recovery, Shootaring Canyon Mill, West Slope Project, Velvet-Wood Project, Slick Rock Project, Marquez-Juan Tafoya, Marysvale, Calf Mesa, Artillery Peak, Dripping Springs Quartzite, JD-7, JD-8, Anfield Energy US Corp., Anfield Precious Metals Inc., Anfield Resources Holding Corp., ARH Wyoming Corp., Highbury Resources Inc., Neutron Energy Inc., BRS Inc., Merritech Development Corporation, Dencam Development Corporation, Consolidated Dencam Development Corporation, Equinox Exploration Corp., Equinox Copper Corp., Anfield Resources Inc.
Press page anfieldenergy.com/news

Metrics

Valuation  
Market cap —
Market cap (USD) —
P/E —
PEG —
P/BV —
P/S —
P/OCF —
P/FCF —
Dividend yield —
Turnover / mcap —
Returns  
ROE -43.0%
ROI -33.5%
ROIC -33.5%
Profit margin —
Growth  
Revenue growing —
Profits growing No
Revenue up 3y —
Revenue up 5y —
Earnings growth 3y (net profit CAGR) —
Quality  
Profitable No
Margin expanding —
Buying back stock —
Diluting (TTM) —
Debt/Equity 27.9%
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 0
Quality score —
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021 FY 2020 FY 2019 FY 2018
Assets 84.085M 80.009M 75.273M 36.01M 31.821M 23.891M 18.976M 7.032M
Net profit -19.722M -11.446M 13.176M -8.858M -9.865M -7.501M -8.979M -10.371M

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

VANCOUVER, British Columbia, Oct. 27, 2026 – Anfield Energy Inc. (“Anfield” or the “Company”) (TSX.V: AEC; NASDAQ: AEC; FRANKFURT: 0AD) is pleased to provide an update on the license renewal and site preparation activities at its Shootaring Canyon Mill (“Shootaring” or the “Mill”) in Garfield County, Utah. On October 21, 2026, the Utah Department of Environmental Quality’s Division of Waste Management and Radiation Control (“DWMRC” or the “Division”) provided the Company with draft copies of both the proposed renewed radioactive materials license for the Mill (the “Draft License”) and the proposed groundwater discharge permit for the Mill (the “Draft Permit”). Shootaring is one of only three licensed, permitted, and constructed conventional uranium mills in the United States and remains central to Anfield’s hub-and-spoke strategy.

Corey Dias, Anfield CEO, commented: “Receiving both the draft renewed license and draft groundwater discharge permit from DWMRC is meaningful progress on the Shootaring reactivation pathway and moves us one significant step closer to securing the renewed license. We appreciate the Division’s continued work on our application and look forward to the 45-day public comment process potentially commencing by the end of 2026.

In the interim, our team continues to remove legacy equipment from the mill under our existing license so that the mill is ready for refurbishment as soon as the renewed license is received, which we are targeting for the second quarter of 2027. Our goal remains to restore domestic conventional uranium and vanadium milling capacity in the United States.”

License Renewal Progress

Receipt of both the Draft License and Draft Permit is an important step in the renewal of the Mill’s radioactive materials license, which the Company’s wholly-owned subsidiary, Anfield Resources Holding Corp., applied for in its application dated April 5, 2024. Anfield has submitted all materials requested by the Division in connection with the application, and these materials and additional responses to the Division’s queries have informed both the Draft License and Draft Permit. The Company is reviewing both documents and expects to discuss them further with Division staff in the coming weeks.

Based on its discussions with Division staff to date, the Company currently anticipates that the documents will be ready for public notice and comment around the end of 2026, with the 45-day public comment period beginning either in late 2026 or early 2027. The timing of the public comment period is determined by the Division and remains subject to change.

Key Terms of the Draft License

As currently drafted, and subject to change before any final decision, the Draft License would, among other things:

  • authorize the possession of natural uranium and 11e.(2) byproduct material at the Shootaring Canyon uranium milling facility; and
  • provide that the mill production rate shall not exceed 1,500 tons – that is, 3 million pounds – of yellowcake per year.

The Draft License would also require the Company to maintain a financial surety and a valid groundwater discharge permit at all times. In addition, it sets out the groundwater monitoring network, compliance monitoring and reporting requirements, and best available technology performance standards for the Mill’s process ponds, South Cell and decontamination pad.

Planned Mill Upgrades

Separately from the terms of the Draft License, the Company’s refurbishment plans for Shootaring target a throughput capacity of 1,000 tons per day and the addition of a new vanadium circuit, supporting the Company’s plan to process both uranium and vanadium ore from multiple project sources through Shootaring as the central hub.

Site Preparation Activities

The Company continues site preparation work within the Mill’s leach area under its existing license. This work focuses on removing equipment that Anfield intends to replace as part of the refurbishment, including leach tanks, associated piping, electrical systems, pumps, motors and related infrastructure.

Subject to the issuance of the renewed license, Anfield is targeting the start of major refurbishment work in the second quarter of 2027. The Company expects the site preparation completed under the existing license to help shorten the overall refurbishment timeline after the renewed license is issued.

Qualified Person

Douglas L. Beahm, P.E., P.G., is the Company’s qualified person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and has reviewed, verified and approved the scientific and technical information contained in this news release. Mr. Beahm is not independent of the Company, as he is the Company’s Chief Operating Officer.

About Anfield

Anfield Energy is a uranium and vanadium development and near-term production company committed to becoming a significant supplier of energy-related fuels through sustainable, efficient growth of its U.S.-based assets. The Company’s flagship asset is the Shootaring Canyon Mill in Utah, one of only three licensed, permitted, and constructed conventional uranium mills in the country. Anfield’s portfolio includes the advanced Velvet-Wood project (Utah) and other conventional uranium-vanadium assets in Utah, Colorado, Arizona, and New Mexico. All of Anfield’s assets are located in the United States, positioning the Company to help meet America’s growing nuclear fuel needs.

On behalf of the Board of Directors
ANFIELD ENERGY INC.
Corey Dias, Chief Executive Officer

VANCOUVER, British Columbia, Oct. 01, 2026 — Anfield Energy Inc. (“Anfield” or the “Company”) (TSX.V: AEC; NASDAQ: AEC; FRANKFURT: 0AD) is pleased to announce that the Colorado Division of Reclamation, Mining and Safety (“DRMS” or the “Division”) has concluded its review of the 112d-1 Hard Rock Reclamation Permit Application for the Company’s past-producing JD-8 uranium and vanadium mine (the “JD-8 Mine” or “JD-8”) in Montrose County, Colorado, filed by Anfield’s operating subsidiary, Highbury Resources Inc. (“Highbury”), under File No. M-2025-056. By decision letter dated September 29, 2026, the Division approved a permit area and affected area of 28.30 acres and set the required financial warranty (reclamation surety) at US$620,000. The reclamation permit will be issued once the Division receives and verifies Highbury’s financial and performance warranty.

With the Division’s review complete, the focus turns to Federal review under the U.S. Department of Energy (“DOE”) Uranium Leasing Program, which is currently advancing. On September 29, 2026, DOE notified the Company that it had reviewed Highbury’s draft Environmental Assessment (“EA”) template for the JD-8 Mine Plan and found it acceptable, allowing the National Environmental Policy Act (“NEPA”) review of the JD-8 Mine Plan to proceed. Subject to permit issuance, DOE Mine Plan approval and remaining operational readiness work, Anfield continues to target a restart of uranium and vanadium production at JD-8 by the end of the second quarter of 2027.

Separately, Anfield has responded to the U.S. National Nuclear Security Administration (“NNSA”) request for information regarding the potential acquisition of approximately 4 million pounds of unobligated domestic uranium per annum to support national-security fuel-cycle requirements.

Ken Mushinski, Anfield Chairman commented: “This is a major step toward restarting Anfield’s production in 2027, and it is especially meaningful for me personally, as a former President of Cotter Corporation, the previous owner of this significant resource. Given my first-hand knowledge of and experience with the JD-8 resource, legacy mining and permitting preservation, I have genuine confidence in the current permitting and restart work being accomplished by Anfield today. We look forward to becoming a major contributor to U.S. uranium and vanadium production, and this decision is another significant step toward that goal.”

Corey Dias, Anfield CEO, stated, “The completion of the Division’s review is a defining milestone for JD-8 and for our Colorado strategy. We now have a clear, defined path to permit issuance, and DOE’s acceptance of our Environmental Assessment template shows the federal process is also poised for progress. JD-8 is a past-producing mine with existing underground workings and is intended to be another spoke feeding Shootaring, similar to Velvet-Wood. With term uranium prices at nominal record levels, we believe that advancing a permitted, U.S. conventional mine toward production will allow Anfield to take full advantage of current market conditions.”

Once the DRMS permit is issued and DOE approval is received, the Company expects to proceed with mobilization, underground rehabilitation and restart activities. The existing JD-7 mine infrastructure will be used as the operations base for the Monogram Mesa Mine Complex, which includes the JD-8 mine.

Because the application is no longer contested, the Division proceeded to its decision, and the JD-8 application will not be on the agenda for the Colorado Mined Land Reclamation Board’s regular October 14–15, 2026 meeting.

JD-8 in Anfield’s Hub-and-Spoke Strategy

JD-8 is located approximately 11 miles west of Naturita, Colorado, on approximately 28.3 acres within DOE Uranium Leasing Program lease tracts. It is a past-producing conventional underground uranium and vanadium mine and a key asset within Anfield’s Monogram Mesa Mine Complex. JD-8 was the last of the historic Cotter Corporation mines to suspend operations, in 2006, due to market conditions. The restart plan uses conventional underground mining methods and leverages the existing underground workings.

Anfield’s PEA contemplates the Shootaring Canyon Mill as a central processing hub with a target capacity of 1,000 tons per day, fed by Velvet-Wood (Utah), Slick Rock (Colorado) and six West Slope mines, including JD-8. The PEA estimates average annual production of approximately 1.3 million pounds of U₃O₈ and 6.4 million pounds of V₂O₅ over a 15-year mine life, with a pre-tax net present value (8% discount) of US$606 million and pre-tax internal rate of return of 106% (post-tax NPV of US$533 million and IRR of 97%), based on US$100 per pound uranium and US$9 per pound vanadium.¹ Velvet-Wood remains the Company’s first mine advancing toward production; JD-8 and Slick Rock are intended to be the next mines in the hub-and-spoke model. The potential future addition of some, or all, of the Company’s fifteen DOE lease tracts not included in the PEA represents upside to the production pipeline. Following JD-8, Anfield intends to advance permitting at JD-7 and Slick Rock.

Uranium Market

Uranium markets remain strong. According to industry-average prices published by Cameco Corporation (based on UxC and TradeTech data), the long-term uranium price closed August 2026 at US$96.50 per pound, above its 2007 peak in nominal terms, and the month-end spot price was US$89.68 per pound. The United States consumes nearly 50 million pounds of uranium annually yet produces only a small fraction domestically. Anfield believes that permitted, past-producing conventional mines that can feed a licensed U.S. mill are well placed in this market.

Growing U.S. Government Demand for Domestic, Unobligated Uranium: Consistent with that view, Anfield submitted a response to a Request for Information titled “NNSA Uranium Acquisition” (Notice No. 89233126RNA000332), for which responses were due September 15, 2026. In the RFI, NNSA described a long-term, steady-state requirement of approximately 4 million pounds per year of unobligated U.S.-origin U₃O₈ (approximately 1,500 metric tons of uranium as UF₆), identified 2030 as the earliest opportunity to begin defense mission-specific procurements, and stated that it intends to procure from the domestic uranium recovery industry, including conventional uranium mills. The RFI is market research and not a solicitation or commitment to purchase. Separately, on August 26, 2026, the U.S. Army announced that it expects more than 20 nuclear microreactors to be built and operated at U.S. military installations under its Janus Program. Anfield believes that its U.S. conventional mines, including JD-8, together with its licensed Shootaring Canyon Mill, are well positioned to help meet growing demand for domestic, U.S.-origin uranium.

Qualified Person

Douglas L. Beahm, P.E., P.G., is the Company’s qualified person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and has reviewed, verified and approved the scientific and technical information contained in this news release. Mr. Beahm is not independent of the Company, as he is the Company’s Chief Operating Officer. [Doug to confirm sign-off.]

Mineral Resources and PEA Cautionary Statement

Mineral resources are not mineral reserves and do not have demonstrated economic viability. The PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized. The JD Mines mineral resource estimate is set out in the technical report titled “US DOE Uranium/Vanadium Leases JD-6, JD-7, JD-8 and JD-9, Montrose County, Colorado, USA, Mineral Resource Technical Report, National Instrument 43-101,” dated effective April 10, 2022, which the PEA’s qualified persons reviewed and deemed to remain valid and effective.¹

Production Decision

The Company’s decision to advance development and permitting of the JD-8 uranium and vanadium mine is based on historical production data and analysis of available technical information, and not on a feasibility study of mineral reserves demonstrating economic and technical viability. As a result, there is increased uncertainty and a higher risk of economic or technical failure associated with that decision.

About Anfield

Anfield Energy is a uranium and vanadium development and near-term production company committed to becoming a significant supplier of energy-related fuels through sustainable, efficient growth of its U.S.-based assets. The Company’s flagship asset is the Shootaring Canyon Mill in Utah, one of only three licensed, permitted, and constructed conventional uranium mills in the country. Anfield’s portfolio includes the advanced Velvet-Wood project (Utah) and other conventional uranium-vanadium assets in Utah, Colorado, Arizona, and New Mexico. All of Anfield’s assets are located in the United States, positioning the Company to help meet America’s growing nuclear fuel needs.

On behalf of the Board of Directors
ANFIELD ENERGY INC.
Corey Dias, Chief Executive Officer

VANCOUVER, British Columbia, Sept. 15, 2026 – Anfield Energy Inc. (“Anfield” or the “Company”) (TSX.V: AEC; NASDAQ: AEC; FRANKFURT: 0AD) today announced that its operating subsidiary, Highbury Resources, Inc. (“Highbury”), has advanced Colorado state permitting for the JD-8 uranium and vanadium mine in Montrose County. By rationale dated August 24, 2026, the Colorado Division of Reclamation, Mining and Safety (“DRMS”) determined that Highbury’s Regular (112d) reclamation permit application (File No. M-2025-056) meets the requirements of the Colorado Mined Land Reclamation Act and the Mineral Rules and Regulations of the Colorado Mined Land Reclamation Board (the “Board” or “MLRB”) and recommended that the Board approve the application. A staff finding of completeness, together with a recommendation for approval, is a significant de-risking event. A formal public hearing is scheduled for the Board’s October 14–15, 2026 meeting in Denver.

DRMS is Colorado’s principal state authority for hard-rock mine reclamation permitting. A Division recommendation for approval moves JD-8 from staff-level review into a defined Board decision window — a significant milestone in Anfield’s Colorado West Slope / Monogram Mesa permitting program. The Board hearing is the final step in completing Anfield’s state permitting for JD-8.

Corey Dias, Anfield CEO, commented: “DRMS’s recommendation that the Board approve the JD-8 permit is a major permitting milestone. Colorado DRMS is the primary state authority for this mine-plan decision, and the October Board hearing puts us in a defined decision window. JD-8 is planned as Anfield’s second mine after Velvet-Wood, with a targeted restart by the end of Q2 2027, after which we intend to advance both JD-7 and Slick Rock. This is concrete progress toward domestic conventional production feeding our Shootaring-centered hub-and-spoke strategy.”

Permitting Path

This milestone follows a defined sequence of steps in the process:

  • December 22, 2025 — DRMS issued an initial completeness determination on Highbury’s JD-8 restart application package, allowing the matter to advance through substantive review.
  • April 29, 2026 — The 112d application under File No. M-2025-056 was filed with DRMS (as reflected in the Division’s September 10, 2026 hearing notice).
  • August 24, 2026 — DRMS issued its rationale recommending that the Board approve the application.
  • September 10, 2026 — DRMS announced a Formal Board Hearing during the Board’s October 14–15, 2026 meeting in Denver.

Updated Timeline and Hub-and-Spoke Strategy

Subject to Board approval and remaining operational readiness work, Anfield is targeting a restart of uranium and vanadium production at JD-8 by the end of the second quarter of 2027. This updated timeline reflects the remaining Board process, mobilization, and underground restart activities at a past-producing brownfield site. Velvet-Wood in Utah remains the Company’s first mine advancing toward production; JD-8, along with Slick Rock, are intended to be the next mines in Anfield’s hub-and-spoke model, with ore shipped to a permitted mill — supporting the Shootaring Canyon Mill in Utah, one of only three licensed, permitted, and constructed conventional uranium mills in the United States. No on-site processing or milling is proposed in the JD-8 application.

Upon completion of JD-8 state reclamation permitting, Anfield intends to focus on advancing additional Colorado mine permitting at both JD-7 (within the Monogram Mesa Mine Complex) and at Slick Rock.

Market and U.S. Policy Backdrop

Since Anfield’s April 8, 2026 JD-8 amendment announcement, uranium market conditions and U.S. nuclear-fuel policy have continued to strengthen. The uranium long-term contract price closed August 2026 at US$96.50 per pound, above its 2007 peak, while spot U₃O₈ has recently traded near US$90 per pound.

In the United States, policy support for domestic nuclear fuel has accelerated. The U.S. Department of Energy has advanced large-scale nuclear supply-chain financing, including US$17.5 billion in conditional American Nuclear Supply Chain loans to support new large reactors, and has continued implementation of domestic enrichment and fuel-cycle programs under the Defense Production Act. Additional recent developments include federal support for reactor restarts, expansion plans at the only commercial-scale U.S. enrichment plant, and continued administration emphasis on reducing reliance on foreign uranium as the ban on Russian uranium imports phases toward full effect in 2028. EIA data have also shown a rebound in U.S. uranium concentrate production.

Anfield believes this combination of stronger term and spot pricing and a more supportive U.S. nuclear-fuel policy environment reinforces the strategic value of advancing permitted, past-producing conventional mines that can feed a licensed U.S. mill.

About JD-8

The JD-8 Mine is located approximately 11 miles west of Naturita, Colorado, on approximately 28.3 acres within Department of Energy Uranium Leasing Program lease tracts. It is a past-producing conventional underground uranium and vanadium mine and a key asset within Anfield’s Monogram Mesa Mine Complex. Historic Cotter operations at JD-8 were suspended in 2006 due to market conditions.

Production Decision

The Company’s decision to advance development and permitting of the JD-8 uranium and vanadium mine is based on historical production data and analysis of available technical information, and not on a feasibility study of mineral reserves demonstrating economic and technical viability. As a result, there is increased uncertainty and a higher risk of economic or technical failure associated with that decision.

About Anfield

Anfield Energy is a uranium and vanadium development and near-term production company committed to becoming a significant supplier of energy-related fuels through sustainable, efficient growth of its U.S.-based assets. The Company’s flagship asset is the Shootaring Canyon Mill in Utah, one of only three licensed, permitted, and constructed conventional uranium mills in the country. Anfield’s portfolio includes the advanced Velvet-Wood project (Utah) and other conventional uranium-vanadium assets in Utah, Colorado, Arizona, and New Mexico. All of Anfield’s assets are located in the United States, positioning the Company to help meet America’s growing nuclear fuel needs. The U.S. consumes nearly 50 million pounds of uranium annually yet produces only a small fraction domestically.

On behalf of the Board of Directors
ANFIELD ENERGY INC.
Corey Dias, Chief Executive Officer

Prompts

Anfield Energy Inc. (ticker AEC), listed in Canada.

Company History

Date Change Detail
Aug 7, 2018 Renamed ANFIELD RESOURCES INC → ANFIELD ENERGY INC.
Sep 23, 2016 Renamed EQUINOX COPPER CORP → ANFIELD RESOURCES INC
Apr 23, 2013 Renamed EQUINOX EXPLORATION CORP → EQUINOX COPPER CORP
— Former tickers ANLDF

ETFs Holding Anfield Energy Inc.

ETF Weight in ETF Shares Market value As of
DARP 0.36% 37,230 $ 99.152K Nov 17, 2026

Securities

Ticker Type Class Market Exchange Last price Price date
AEC Common share — US nasdaq 3.29 USD 2026-09-30
AEC canonical Common share — CA tsx — —