ASX/TSX: PRU | WWW.PERSEUSMINING.COM PERSEUS MINING COMPETENT PERSON STATEMENT: All production targets referred to in this report are underpinned by estimated Ore Reserves which have been prepared by Competent Persons in accordance with the…
ASX/TSX: PRU | WWW.PERSEUSMINING.COM
PERSEUS MINING
COMPETENT PERSON STATEMENT:
All production targets referred to in this report are underpinned by estimated Ore Reserves which have been prepared by Competent Persons in accordance with the requirements of the JORC Code.
The information in this report that relates to the Mineral Resources and Ore Reserves was updated by the Company in a market announcement “Perseus Mining updates Mineral Resources and Ore Reserves”
released on 26 August 2026. The Company confirms that all material assumptions underpinning those estimates and the production targets, or the forecast financial information derived therefrom, in that market
release continue to apply and have not materially changed.
The Company confirms that the material assumptions underpinning the estimates of Ore Reserves described in “Technical Report — Edikan Gold Mine, Ghana” dated 6 April 2022, “Technical Report — Yaouré Gold
Project, Côte d’Ivoire” dated 18 December 2023, “Technical Report — Sissingué Gold Project, Côte d’Ivoire” dated 29 May 2015, and “Technical Report — Nyanzaga Gold Project, Tanzania” dated 10 June 2025
continue to apply.
CAUTION REGARDING FORWARD LOOKING INFORMATION:
This report contains forward-looking information which is based on the assumptions, estimates, analysis and opinions of management made in light of its experience and its perception of trends, current conditions
and expected developments, as well as other factors that management of the Company believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove
to be incorrect. Assumptions have been made by the Company regarding, among other things: the price of gold, continuing commercial production at the Yaouré Gold Mine, the Edikan Gold Mine and the Sissingué
Gold Mine without any major disruption, development of a mine at Nyanzaga, the receipt of required governmental approvals, the accuracy of capital and operating cost estimates, the ability of the Company to
operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of
all factors and assumptions which may have been used by the Company. Although management believes that the assumptions made by the Company and the expectations represented by such information are
reasonable, there can be no assurance that the forward-looking information will prove to be accurate. Forward-looking information involves known and unknown risks, uncertainties, and other factors which may
cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forward-looking
information. Such factors include, among others, the actual market price of gold, the actual results of current exploration, the actual results of future exploration, changes in project parameters as plans continue to
be evaluated, as well as those factors disclosed in the Company's publicly filed documents. Readers should not place undue reliance on forward-looking information. Perseus does not undertake to update any
forward-looking information, except in accordance with applicable securities laws.
CAUTIONARY STATEMENTS
2
PERSEUS MINING LIMITED
3
HIGH MARGIN, CASH GENERATIVE GOLD PRODUCER
GROWING
RESERVE BASE
MISSION
To generate material benefits for all of our stakeholders, in fair and
equitable proportions
GROUP MINERAL RESOURCE – 10.64 MOZ
GROUP ORE RESERVE – 7.0 MOZ
TARGETING RESOURCE GROWTH AT ALL
PRODUCING ASSETS
ORGANIC GROWTH
PROJECT
NYANZAGA – 4
TH
OPERATING MINE JAN 27
CMA UNDERGROUND RAMPING UP
3 PRODUCING
MINES
EDIKAN, SISSINGUÉ, YAOURÉ
20+ YEARS OPERATING IN AFRICA
PERSEUS MINING LIMITED
4
WHY IN AFRICA?
WORLD-CLASS GEOLOGY | GROWING ECONOMIES | LASTING VALUE
Two decades in Africa. Three producing mines. New mine in Tanzania. Platform for long-term enduring value
World-Class
Geology
Africa holds some of the world's
most prospective, underexplored
gold belts
Growing
Economies
Supportive
Partnerships
Proven
Returns
Rising populations and expanding
middle classes are driving regional
growth and infrastructure
Host governments and communities
increasingly back long-term mining
investment
Decades of successful mine
development show Africa can deliver
world-class value
PERSEUS MININGPERSEUSMINING.COM
87%
Australia
44%
UK 5%
Europe (ex-UK) 7%
North America
36%
Asia
4%
Other
4%
CORPORATE OVERVIEW
5
AUD$
ASX Share price per share
(1)
6.84
Shares outstanding 1,327.1M
Market capitalisation 9,077M
Less: Cash and Bullion
(2)
1,456M
Plus: Debt0M
Enterprise value 7,621M
1.ASX:PRU share price as at September 23
rd
2026.
2.Cash and bullion balance at 30 June 2026 includes available cash at bank of US$924m and bullion valued at US$110m and
converted to AUD at a A$:US$ exchange rate of 0.7101
Data valid at 31
August 2026
GEOGRAPHIC OWNERSHIP BREAKDOWN
% held by
institutions
45%
%held by Top
10 investors
68%
% held by Top
25 investors
Broker Coverage: ASX & TSX
CONSISTENTLY OUTPERFORMING THE US$ GOLD PRICE
PERSEUS MINING LIMITED
6
BUILT ON SUCCESSFULLY DEVELOPING OREBODIES INTO MINES
Perseus has African development capabilities and a proven track record of delivering projects ahead of schedule and below budget,
demonstrating its ability to successfully transition assets from acquisition, development and through to sustained long-term operations
Edikan
(Ghana)
Sissingué
(Côte d’Ivoire)
Yaouré
(Côte d’Ivoire)
CMA Underground
(Côte d’Ivoire)
Nyanzaga
(Tanzania)
✓Established as Perseus’s
first large-scale operating
mine
✓Delivered ahead of
schedule and on budget
✓Developed satellite
operations at Fimbiasso
and Bagoé
✓Achieved production on
schedule and below
budget
✓Commercial production to
be reached in Q3 CY27
✓On track for first gold in
Jan CY27
Perseus maintaining sustained operational performance
Dependable operational delivery – Perseus has not missed annual group guidance
Depth of management
✓
Strong Technical Capability
✓
Proven projects team
✓
Strong social license
✓
PERSEUS MINING LIMITED
Initial Ore ReserveCurrent Ore Reserve
and Perseus gold
production
7
TRACK RECORD OF ADDING MATERIAL VALUE THROUGH DRILLING
1.Initial Endowment based on initial Maiden Ore Reserve Estimate published by Perseus on a 100% basis;
2.Current Endowment comprised of Ore Reserves on a 100% basis plus annual contained gold mined since first production (through to 30 June 2026). Ore Reserves (OR) as detailed in the ASX release “Perseus Mining
Updates Mineral Resources and Ore Reserve Estimates” dated 26 August 2026.
3.See ASX release dated 20 February 2026 “Perseus Mining Increases Nyanzaga Gold Project Ore Reserves to 4.0 Moz”.
MINE LIFE EXTENDED FROM
9 to 15 years
MINE LIFE EXTENDED FROM
6 to 12 years
MINE LIFE EXTENDED FROM
10 to 20 years
YaouréSissinguéEdikan
MINE LIFE EXTENDED FROM
11
3
to 16 years
Nyanzaga
75%
Current Ore Reserve
Initial Ore ReserveCurrent Ore Reserve
and Mining Depletion
FY26 OR
2
:
1,661 koz
Depletion:
1,441 koz
1,520 koz
1
Initial Ore ReserveCurrent Ore Reserve
and Mining Depletion
Depletion:
696 koz
FY26 OR
2
:
233 koz
657 koz
1
104%
41%
Initial Ore ReserveCurrent Ore Reserve
and Mining Depletion
90%
2,141 koz
1
Depletion:
3,074 koz
FY26 OR
2
998 koz
2,342 koz
1
FY26 OR
2
:
4,109 koz
PERSEUS MINING
•New Dividend Policy – minimum 20% of operating cash flow
(1)
•Record shareholder returns – Full year dividend of 14 cents per share
•Increased Share buyback to A$350M
•Special Distribution of A$100M to be determined in coming months
•Ore Reserves up 40% and Mineral Resources up 37%
•Yaouré CMA UG first stoping operations commenced April 2026
•Nyanzaga on track for first gold pour January 2027
GROWTH
•Record financial performance
•Operating cash flow up 24%
•Earnings per share up 17%
•Industry leading TRIFR 0.91
•Zero Lost Time Injuries across the business
•9M hours LTI free at Nyanzaga project
8
FY26 DELIVERED EXCEPTIONAL RESULTS
SUSTAINABILITY
(1)Operating Cash Flow is ‘Net cash inflows from operating activities’ within the Consolidated Statement of Cashflows less
Dividends and withholding tax paid to Non-Controlling Interests during the period
FINANCIAL
PERFORMANCE
SHAREHOLDER RETURNS
SUSTAINABILITY
PERSEUS MINING
(1)Cash Margin equals Average Sales Price minus All-in Site Cost (AISC). Notional Cashflow equals Cash Margin multiplied by Gold Produced and excludes CMA Underground Development Project.
GOLD
PRODUCED
404,998 oz
ALL-IN
SITE COST
NOTIONAL
CASHFLOW
(1)
NET CASH
& BULLION
US$1,750/oz
US$769M
US$1,034M
9
OPERATIONAL DELIVERY DRIVING STRONG FINANCIAL PERFORMANCE
PERSEUS MINING
DELIVERING RECORD RETURNS TO SHAREHOLDERS
INCREASED DIVIDENDS
PER SHARE
RETURN OF FUNDS –
SALE OF SUDAN
TOTAL FY26
DIVIDEND
A$14.0cpsA$187M
+87%
FY26 BUYBACK
EXECUTED
A$127M
FY27 BUYBACK
APPROVED
A$350M
PROPOSED SPECIAL
DISTRIBUTION
(1)
~A$100M
UPSCALED
BUYBACK
Interim Dividend
AUD ($M)
Final Dividend
AUD ($M)
Buyback
AUD ($M)
Proposed Special
Distribution AUD ($M)
22.4
FY22
14.5
34.1
FY23
17.2
51.6
FY24
34.3
67.6
83.6
FY25
67.5
119.4
126.7
100.0
FY26
AUD$M
10.0
1
0
Cumulative returns of
A$667M
to shareholders
1
0
(1)Split between dividend and capital reduction to be determined and to be announced to shareholders in the coming months.
PERSEUSMINING.COMPERSEUS MINING
11
RELIABLE OPERATING CASH
FLOW
Disciplined
operational
performance
SUSTAINING
CAPITAL
BALANCE SHEET RESILIENCE
Minimum liquidity
(1)
US$500M
Undrawn debt
US$400M
HIGH YIELD
GROWTH CAPITAL
FY27
~US$530M
Nyanzaga $230M
(2)
Yaouré CMA $80M
Edikan cutbacks $140M
Exploration $70 - 80M
FY27
US$50-60M
Maintain commitment
to employees, governments,
communities, suppliers
and lenders
ENHANCED CAPITAL ALLOCATION FRAMEWORK
1.Minimum Liquidity is Cash and Cash equivalents plus debt available for drawdown
2.US$230m includes US$60 million estimate for pre-production costs to be incurred before first gold pour Q3 27.
3.Net Cash Flow from operating activities less the Dividends paid to non-controlling interests (NCI) as per the audited Consolidated Statement of Cash Flow in the audited Annual Financial Statements.
SUSTAINABLE DIVIDEND
Min 20%
of Net Cash Flow
from Operations
(3)
+
Supplemental Returns
Safe, sustainable operations
& asset integrity
Grow production,
extend mine life, disciplined
capital investment focused
on high yield returns
Maintain strong
balance sheet capacity
through the cycle for
strategic opportunities
SUPPLEMENTAL RETURNS
Via dividends, share
buybacks or capital returns
where there is capacity
to pay
PERSEUS MININGPERSEUSMINING.COM
12
GROUP
ORE
RESERVES
7.0 Moz
up 40%
GROUP M&I
MINERAL
RESOURCES
10.6Moz
up 37%
PERSEUS MINERAL RESOURCES
(1)
PERSEUS ORE RESERVES
(1)
CONTINUED FOCUS ON ORGANIC GROWTH
5,003
1,767
217
19
-4
7,001
EOM June 2025 Nyanzaga Yaouré Edikan Sissingué EOM June 2026
koz Au
500
1,500
2,500
3,500
4,500
5,500
6,500
7,500
1.See ASX release “Perseus Mining Updates Mineral Resources and Ore Reserve Estimates” dated 26 August 2026. Resources include Measured and
Indicated only
US$70-80M exploration spend in FY27
PERSEUS MINING
13
GROWING YAOURÉ GOLD MINE - CÔTE D’IVOIRE
Planned UG Development
Potential Mineralisation
Outline
Existing drilling
Final CMA Pit
1.See ASX release “Perseus Mining Updates Mineral Resources and Ore Reserve Estimates” dated 26 August 2026.
O R E
R E S E R V E
( 1 )
1,661
KOZ
A V E R A G E G R A D E
1.24 g/t
M I N E R A L
R E S O U R C E
( 1 )
2,857
KOZ
A V E R A G E G R A D E
1.53 g/t
Potential extension of the CMA UG
Potential dept extensions at Yaouré
Mining Yaouré
Open Pit
Commenced CMA
UG Production
FY26 Q4
4%
41%
17%
9%
29%
CMA SW
Yaouré open pit
Stockpiles
Zain 1 & 2
CMA underground
Proved &
Probable
Reserves by
Deposit
13
PERSEUS MININGPERSEUSMINING.COM
Extension Cutbacks commenced
Esuajah North (ESN)
Fetish - Second mining phase
Underpins ore delivery for next 4 years
GROWING EDIKAN GOLD MINE – GHANA
1.See ASX release “Perseus Mining Updates Mineral Resources and Ore Reserve Estimates” dated 26 August 2026.
ESN
Section looking east
AG-Fobinso
Long-section looking southwest
Fetish
Long-section looking northwest
Planned Drilling
Mineralisation
Outline
O R E
R E S E R V E
( 1 )
998
KOZ
A V E R A G E G R A D E
0.94 g/t
M I N E R A L
R E S O U R C E
( 1 )
2,528
KOZ
A V E R A G E G R A D E
0.88 g/t
AG-Fobinso FY27-28 drill program
Targeting reserve growth and conversion
Fetish and ESN FY27-28 drill program
Confirm and convert mineralisation below current pit floor
20%
2%
17%
19%
35%
7%
NkosuoAG Annex
Esuajah NorthFetish
Esuajah South (UG)Stockpiles
Proved & Probable
Reserves by Deposit
Commencing
cutbacks
Mining Nkosuo Pit
14
PERSEUS MININGPERSEUSMINING.COM
15
Sissingué Stage 5
Planned drilling
Mineralisation Outline
Reserve Pit Design
Mining Depletion
GROWING SISSINGUÉ GOLD COMPLEX –
CÔTE D’IVOIRE
1.See ASX release “Perseus Mining Updates Mineral Resources and Ore Reserve Estimates” dated 26 August 2026.
61.6%
26.3%
12.1%
SissinguéBagoéStockpiles
Proved &
Probable
Reserves by
Deposit
O R E
R E S E R V E
( 1 )
233
KOZ
A V E R A G E G R A D E
1.41 g/t
M I N E R A L
R E S O U R C E
( 1 )
541
KOZ
A V E R A G E G R A D E
1.35 g/t
FY 27 Drilling program
Extension to mineralisation on Sissingué,
Fimbiasso andBagoé concessions
Brownfield exploration commitment FY27
Defining potential satellite deposits
Mining Veronique,
Antoinette and
Sissingué pits
Commenced
Sissingué Stage 5
Cutback
15
GROWTH CATALYST – NYANZAGA GOLD PROJECT – TANZANIA
LONG LIFE / LOW-COST CORNERSTONE ASSET
MINERAL
RESOURCE
(1)
4,715
KOZ
AVERAGE GRADE
1.33 g/t
ORE
RESERVE
(1)
4,109
KOZ
AVERAGE GRADE
1.34 g/t
16 YEAR LIFE @
>200k pa
(FY28 to FY41)
AVERAGE AISC
(1)
US$1,600–
US$1,700/oz
CONSTRUCTION PROGRESS
ON TRACK –
FIRST GOLD
January 2027
PROGRESS ACHIEVED
to August '26
80.5%
TOTAL CONSTRUCTION
COSTS INCURRED
US$374M
(77%)
(2)
TOTAL PRE-PRODUCTION
COSTS INCURRED
US$26M
[1] See ASX release dated 26 August 2026: Perseus Mining Updates Mineral Resources and Ore Reserve Estimates. Resources include Measured and Indicated only.
[2] Refer to ASX release dated 28 April 2025: Perseus Proceeds with Development of Nyanzaga Gold Project. Calculated using development capital of 483M which excludes capitalized preproduction of 39.9M.
PERSEUS MININGPERSEUSMINING.COM
Deeper holes testing trend
completed – good foundation
for understanding of ore
mineralisation geometry
Down plunge potential below
Reserve pit
Process plant construction
16
PERSEUS MINING
17
Economic
contributions US$
FY26
FY25
Economic value
distributed
1.19B
813M
Community
contributions
5.17M
5.6M
Local procurement
714M
545M
Government payments
and payables
384M
219M
Workforce
nationalisation
96%
94%
Safety
indicators
FY26
FY25
TRIFR
(Target – below 1)
0.91
0.60
LTIFR
0.00
0.08
BUILDING SAFER BEHAVIOURSDEEPENING OUR PARTNERSHIPS
First AASB S2 Climate Report published
Completed climate risk and opportunity
assessment, including climate scenario
analysis
Improved roads, health and education
infrastructures for Nyanzaga communities:
lasting value delivered through our
Resettlement Action Plan.
FY26 SUSTAINABILITY PERFORMANCE
PERSEUSMINING.COMPERSEUSMINING.COMPERSEUS MINING
18
18
FY 27 - GROUP GUIDANCE
PARAMETERUNITS2027 FINANCIAL YEAR (FORECAST)
PRODUCTION
Production
(1)
Ounces420,000 - 480,000
AISC
All-in Site Cost
(2)
USD per ounce1,835 - 2,070
SUSTAINING CAPITAL
Sustaining capital
(3)
USD million50 – 60
DEVELOPMENT CAPITAL
Development capital
(4)
USD million~450
EXPLORATION
Exploration USD million70 – 80
1.Nyanzaga production included in guidance is based on FID as released in April 2025 - Refer ASX Release - Perseus mining proceeds with development of the Nyanzaga Gold
Project. Further guidance for Nyanzaga will be provided in Q3 FY27. All operating costs for Nyanzaga are capitalised until Commercial Production planned for Q4 FY27.
2.AISC guidance is based on a gold price assumption of $4,000 per ounce and Government royalty rates of 8% in Côte d'Ivoire and 11% (applicable at $4,000 per ounce) in
Ghana and has only been calculated on the three operating mines (excludes Nyanzaga).
3.Sustaining capital for Yaouré, Edikan and Sissingue is included in calculation of Guidance AISC provided in this table.
4.Comprises Nyanzaga $230M, Yaouré CMA UG $80M, Edikan cutbacks $140M
5.Refer Appendix 2 to this release for FY27 Guidance per operation
FY 27 - GROUP GUIDANCE
PERSEUSMINING.COMPERSEUS MINING
19
Last 3 Year Average EBITDA Margin (%)
(1,2)
57.7%
49.2%
50.5%
PerseusASX peers averageInternational peers average
Maintains a robust, high-margin business that will deliver through cycles
Last 3 Year Average Return on Capital Employed (%)
(1,2)
27.0%
21.1%
19.7%
PerseusASX peers averageInternational peers average
Efficient deployment of capital, delivering sector leading returns
Source: ASX; Company releases; FactSet, S&P Capital IQ.
(1)Market data as at 8 September 2026, converted using the spot AUDUSD of 0.722 and spot CADUSD of 0.724 as at 8 September 2026.
(2)ASX peer group includes Northern Star, Evolution Mining, Genesis Minerals, Capricorn Metals, Regis Resources, Ramelius Resources, Vault
Minerals, Westgold Resources. International gold peer group includes Alamos, Endeavour, B2Gold, Eldorado, IAMGOLD, Equinox,
OceanaGold.
PEER LEADING MARGINS AND RETURN ON CAPITAL
LOW COST OF PRODUCTION AND STRONG COST CULTURE
PERSEUS MININGPERSEUSMINING.COM
OUR INVESTMENT PROPOSITION
20
Cost focused culture
Diversified African asset
portfolio
Growth prospects
underpinned by US$1.4B of
liquidity
Track record of growth
through exploration and
M&A
Proven development and
operational excellence
capabilities
Delivering on promises –
‘We do what we say we
are going to do’
PEER LEADING RETURN ON
CAPITAL EMPLOYED
PORTFOLIO DIVERSIFICATION
BALANCE SHEET
GROWTH
VALUE CREATION
PROVEN EXECUTION
1
2
3
4
56
ASX/TSX: PRU | WWW.PERSEUSMINING.COM
This presentation was authorised for release byPerseus’s Managing Director and CEO, Craig Jones
PERSEUSMININGLIMITEDPERSEUSMINING.COM
APPENDIX 1
FINANCIAL PERFORMANCE
22
PERSEUS MINING
23
FY26 compared to FY25
REVENUE
US$744M
EBITDA
(1)
BASIC EARNINGS
PER SHARE
EARNINGS
PER OUNCE
(2)
OPERATING
CASHFLOW
Up 17%Up 41%Up 24%
Up 19% (US$236M)Up 27%Up 16%
US$1.5B
GROSS PROFIT
FROM OPERATIONS
US$861M
PROFIT
BEFORE TAX
FINAL
DIVIDEND
Up A$4.0cps
Up 27%
US$716M
US$1,204
31.73cps
US$666M
A$9.0cps
FY26 - STRONG FINANCIAL PERFORMANCE
1.Gross profit before depreciation and amortisation
2.Earnings per ounce is calculated as Profit after Tax divided by Gold Ounces Sold
PERSEUS MINING
24
(1)Net cash inflows from operating activities
(2)Operating cash flow per share is calculated as Net cash inflows from operating activities divided by weight average number of outstanding ordinary shares.
(3)Operating cash flow per ounce is calculated as Net cash inflows from operating activities divided by ounces sold.
OPERATING CASH FLOW
FROM OPERATIONS
US$666M
(1)
OPERATING CASH
FLOW PER SHARE
49.38cps
(2)
OPERATING CASH
FLOW PER OUNCE
US$1,670
(3)
Up 26%
Up 24%Up 54%
RESILIENT BALANCE SHEET POSITIONED FOR NEXT PHASE OF GROWTH
NET CASH AND BULLION
US$1,034M
Up US$207M on FY25
LIQUIDITY
US$1,434M
US$400M undrawn debt
LISTED SECURITIES
US$233M
PERSEUSMININGLIMITEDPERSEUSMINING.COM
APPENDIX 2
FY27 PRODUCTION,COST AND
SUSTAINING CAPITAL GUIDNACE
25
PERSEUS MINING
26
FY 27 PRODUCTION, COST AND SUSTAINING CAPITAL GUIDANCE
1.Nyanzaga production included in guidance is based on FID as released in April 2025 - Refer ASX Release - Perseus mining proceeds with development of the Nyanzaga Gold Project. Further guidance for
Nyanzaga will be provided in Q3 FY27. All operating costs for Nyanzaga are capitalised until Commercial Production planned for Q4 FY27.
2.AISC guidance is based on a gold price assumption of $4,000 per ounce and Government royalty rates of 8% in Côte d'Ivoire and 11% (applicable at $4,000 per ounce) in Ghana and has only been
calculated on the three operating mines (excludes Nyanzaga).
3.Sustaining capital for Yaouré, Edikan and Sissingue is included in calculation of Guidance AISC provided in this table.
FY27
Guidance
Gold Production
(koz)
AISC
(2)
($/oz)
Sustaining Capital
(3)
($M)
Exploration
($M)
Group420 – 4801,835 - 2,070
50 - 60 70 – 80
Yaouré150 – 1701,955 - 2,205
28 - 32
Edikan150 – 1701,700 - 1,920
15 - 17
Sissingué65 – 851,865 - 2,105
5 - 7
Nyanzaga55
(1)
2 - 4
PERSEUSMININGLIMITEDPERSEUSMINING.COM
APPENDIX 3
RESERVES & RESOURCES
PERSEUSMINING.COMPERSEUS MINING
28
1.See ASX release “Perseus Mining Updates Mineral Resources and Ore Reserve Estimates” dated
26 August 2026. Resources include Measured and Indicated only.
2.53
1.00
6+
M O Z
M O Z
Y E A R S
M I N E R A L
R E S O U R C E
O R E
R E S E R V E
M I N E
L I F E
Edikan
1
Ghana
0.540.23~4.0
M O ZM O Z
Y E A R S
M I N E R A L
R E S O U R C E
O R E
R E S E R V E
M I N E
L I F E
Sissingué
1
Côte d’Ivoire
2.86
1.66
9+
M O Z
M O Z
Y E A R S
M I N E R A L
R E S O U R C E
O R E
R E S E R V E
M I N E
L I F E
Yaouré
1
Côte d’Ivoire
4.71
4.11
16+
M O ZM O Z
YEARS
M I N E R A L
R E S O U R C E
O R E
R E S E R V E
MINE
LIFE
Nyanzaga
1
Tanzania
DIVERSIFIED 7.0 MOZ RESERVE AFRICAN FOCUSED GOLD MINER
GROUP
4
GROUP
M I N E R A L
R E S O U R C E
O R E
R E S E R V E
10.64
7.0
M O Z
M O Z
Y E A R S
PERSEUS MINING
PERSEUS MINERAL RESOURCES & ORE RESERVES
29
JORC Ore Reserve
1,2,4
JORC Mineral Resource
1,4
PROJECT
PROVEDPROBABLEPROVED & PROBABLE
QUANTITY
Mt
GRADE
g/t gold
GOLD
'000 oz
QUANTITY
Mt
GRADE
g/t gold
GOLD
'000 oz
QUANTITY
Mt
GRADE
g/t gold
GOLD
'000 oz
Edikan
12.70.8735520.20.9964332.90.94998
Sissingué
1.01.34434.11.431905.11.41233
Yaouré
12.40.7329229.11.461,36941.51.241,661
Nyanzaga
---95.71.344,10995.71.344,109
Total
26.10.82690149.11.326,312175.21.247,001
PROJECT
MEASURED RESOURCESINDICATED RESOURCESMEASURED & INDICATED RESOURCESINFERRED RESOURCES
QUANTITY
Mt
GRADE
g/t gold
GOLD
'000 oz
QUANTITY
Mt
GRADE
g/t gold
GOLD
'000 oz
QUANTITY
Mt
GRADE
g/t gold
GOLD
'000 oz
QUANTITY
Mt
GRADE
g/t gold
GOLD
'000 oz
Edikan
21.20.8960468.20.881,92389.40.882,52816.71.0544
Sissingué
1.71.236610.81.3747512.51.355412.11.064
Yaouré
12.40.7329245.61.752,56558.11.532,85732.31.51,591
Nyanzaga
---110.41.334,715110.41.334,7156.51.6343
Total
35.30.85963234.91.289,677270.31.2210,64057.51.42,542
Notes for Table 1 and Table 2:
1 Refer to Notes to individual tables of Mineral Resources and Ore Reserves in respect of each project presented below. See ASX release “Perseus Mining Updates Mineral Resources and Ore Reserve
Estimates” dated 26 August 2026
2 Measured and Indicated Mineral Resources are reported inclusive of Ore Reserves.
3 Sissingué Mineral Resources and Ore Reserves include the Fimbiasso and Bagoé Projects in addition to the Sissingué Gold Mine.
4 The Company holds 90% of Edikan Gold Mine (EGM) and Yaouré Gold Mine (YGM), 86% of Sissingué Gold Mine (SGM) except Bagoé at 90%, and 80% of Nyanzaga Gold Project (NGP).
PERSEUS MINING
30
GROUP MOVEMENTS — JUNE 2025 TO JUNE 2026
Figure 1: Change in Group Ore Reserves by Project
Figure 2: Change in Group Mineral Resources
Key Drivers
•Nyanzaga: largest single contributor to both Reserve and Resource growth, reflecting the February 2026 Feasibility Study update
•Yaouré: net Reserve addition driven mainly by the Yaouré open pit; Resource growth split across pit and Inferred material
•Edikan and Sissingué: continued to replace mining depletion via cutbacks and drilling, broadly maintaining reserve life
•460 koz of Group depletion in FY26 was more than offset by additions across all four assets
PERSEUS MINING
31
YAOURÉ GOLD MINE, CÔTE D’IVOIRE — RESOURCES & RESERVES
Mineral Resources (M&I + Inferred)
CategoryMtg/tkoz Au
M&I58.11.532,857
Inferred32.31.51,591
Ore Reserves (Proved + Probable)
CategoryMtg/tkoz Au
Proved12.40.73292
Probable29.11.461,369
Proved & Probable41.51.241,661
Change in Yaouré Ore Reserves – June 2025 to June 2026
Drivers of FY26 Ore Reserve Change
•Depletion of the CMA open pit, Yaouré open pit, Zain 2 open pit and CMA
Underground via mining and processing during FY26
•Updated Yaouré open pit Mineral Resource from resource definition/grade
control drilling; design changes reflecting increased gold price
•Zain 1 and Zain 2 pit designs re-optimised on updated cost/revenue and
gold price; Zain 2 also gained previously-excluded fresh mineralisation
•CMA Southwest pit design re-optimised on updated cost/revenue and gold
price
•Stockpile changes from mining activity and cut-off-driven reclassification
Economic Assumptions
•Revenue gold price: US$3,000/oz
•Reserve based on a balanced portfolio of ore sources scheduled to an
overall AISC
•Weighted average LOM AISC: US$1,900–$2,000/oz
PERSEUS MINING
32
EDIKAN GOLD MINE, GHANA — RESOURCES & RESERVES
Mineral Resources (M&I + Inferred)
CategoryMtg/tkoz Au
M&I89.40.882,528
Inferred16.71.0544
Ore Reserves (Proved + Probable)
CategoryMtg/tkoz Au
Proved12.70.87355
Probable20.20.99643
Proved & Probable32.90.94998
Change in Edikan Ore Reserves – June 2025 to June 2026
Drivers of FY26 Ore Reserve Change
•Mining depletion in the Nkosuo, Fetish and Esuajah North open pits to 30
June 2026
•Write-off of 3 koz remnant Ore Reserve in the AG open pit
•Cutback at AF Gap Annex; redesigned cutbacks at Esuajah North Stage 3 and
Fetish Stage 3
•Model update and redesign for the Esuajah South underground deposit
•Stockpile depletion and addition
Economic Assumptions
•Revenue gold price: US$3,000/oz
•Reserve based on a balanced portfolio of ore sources scheduled to an
overall AISC
•Weighted average LOM AISC: US$1,650–$1,750/oz
PERSEUS MINING
33
SISSINGUÉ GOLD MINE, CÔTE D’IVOIRE — RESOURCES & RESERVES
Mineral Resources (M&I + Inferred)Ore Reserves (Proved + Probable)
CategoryMtg/tkoz Au
M&I12.51.35541
Inferred2.11.064
CategoryMtg/tkoz Au
Proved1.01.3443
Probable4.11.43190
Proved & Probable5.11.41233
Change in Sissingué Ore Reserves – June 2025 to June 2026
Drivers of FY26 Ore Reserve Change
•Ore depletion from open pit mining at Sissingué, Airport West, Fimbiasso and
Antoinette pits to 30 June 2026
•Revised pit designs for Sissingué, Antoinette and Véronique from optimisation
work, increased gold price and an updated Sissingué Mineral Resource
•Addition of an extended Sissingué Bagoé pit within the Sissingué Main model,
from extra drilling and increased gold price
•Stockpile depletion and additions
Economic Assumptions
•Revenue gold price: US$3,000/oz
•Reserve based on a balanced portfolio of ore sources scheduled to an overall
AISC
•Weighted average LOM AISC: US$2,000–$2,100/oz
PERSEUS MINING
34
NYANZAGA GOLD PROJECT, TANZANIA — RESOURCES & RESERVES
Mineral Resources (M&I + Inferred)
CategoryMtg/tkoz Au
M&I110.41.334,715
Inferred6.51.6343
Ore Reserves (Proved + Probable)
CategoryMtg/tkoz Au
Proved---
Probable95.71.344,109
Proved & Probable95.71.344,109
Change in Nyanzaga Ore Reserves – June 2025 to June 2026
Drivers of FY26 Ore Reserve Change
•Reserve based on the Nyanzaga Mineral Resource as at 30 June 2026 and an
updated Feasibility Study completed in February 2026
•Bulk of the FY26 increase reflects the February 2026 Feasibility Study update
(see “Perseus Mining increases Nyanzaga Gold Project Ore Reserves to 4.0
Moz”, 20 Feb 2026)
•Further +63 koz added within the February Ore Reserve pit from updated pit
allocation and cut-off grade adjustments by June 2026
Economic Assumptions
•Revenue gold price used in Reserve economics: US$3,000/oz
•Mineral Resource pit shell priced at US$2,700/oz; Ore Reserve pit design
priced at US$2,300/oz (a lower, more conservative price than the Resource
shell)
•Weighted average LOM AISC: US$1,600–$1,700/oz
PERSEUS MINING
35
CONSOLIDATED KEY ASSUMPTIONS
AssumptionYaouréSissinguéEdikanNyanzaga
MR Pit Shell Gold PriceUS$3,300/ozUS$3,300/ozUS$3,300/ozUS$2,700/oz
Weighted Avg LOM AISCUS$1,900–$2,000/ozUS$2,000–$2,100/ozUS$1,650–$1,750/ozUS$1,600–$1,700/oz
Cut-off Grade Range0.25–0.45 g/t0.37–0.83 g/t (Sissingué)0.30–0.40 g/t0.28–0.39 g/t
Typical Metallurgical Recovery87.9–93.0%85-93% 91–93% ≈86.0% LOM avg.
Company Interest90%86% (90% Bagoé)90%80%
•All Resources and Reserves reported under the JORC Code (2012)
•Reserve revenue gold price (US$3,000/oz) is deliberately more conservative than the Resource pit-shell price(s) used to define “reasonable prospects for eventual economic
extraction”
•Rounding of tonnes, grade and contained metal to appropriate precision may cause minor discrepancies in totals
Sources & References
•Perseus Mining Limited, “Perseus Mining Updates Mineral Resources and Ore Reserve Estimates”, News Release, 26 August 2026
•Nyanzaga Gold Project, Tanzania – NI 43-101 Technical Report, 10 June 2025
•Yaouré Operations, Côte d’Ivoire – NI 43-101 Technical Report, 18 December 2023
•Edikan Operations, Ghana – NI 43-101 Technical Report, 6 April 2022
•Sissingué Operations, Côte d’Ivoire – NI 43-101 Technical Report, 29 May 2015
•“Perseus Mining increases Nyanzaga Gold Project Ore Reserves to 4.0 Moz”, News Release, 20 February 2026
•Full reports available at www.perseusmining.com and on SEDAR+ (www.sedarplus.ca)
PERSEUSMINING.COMPERSEUS MINING
YAOURÉ GOLD PROJECT – POSITIVE RECONCILIATION OPPORTUNITY
36
•Trend over 6 months of the grade control (GC) model reporting 30% more
ounces as compared to Reserve in the Yaouré OP.
•Improvement in creating mineralisation domains with 8m x 5m spaced GC
as compared to 25m x 25m resource drilling.
Reserve Block Model* - 1,170 m RL ±2.5m
Grade Control Block Model* - 1,170 m RL ±2.5m
PARAMETER
ORE RESERVE TO MILL CORRELATION FACTOR
3 MONTHS6 MONTHS1 YEAR
Tonnes of Ore1.571.531.41
Head Grade0.810.850.86
Contained Gold1.271.301.21
June 2026 Quarterly Reconciliation Result - Yaouré
-
- Oblique view from above looking northeast showing model blocks ≥0.5 g/t Au inside Yaouré open pit
PERSEUSMININGLIMITEDPERSEUSMINING.COM
3
APPENDIX 4
MANAGEMENT, BOARD,
CORPORATE STRUCTURE
PERSEUS MINING
38
BOARD OF DIRECTORS
Rick Menell
Independent Non-Executive Chairman
Amber Banfield
Independent Non-Executive Director
Elissa Cornelius
Independent Non-Executive Director
Daniel Lougher
Independent Non-Executive Director
John McGloin
Independent Non-Executive Director
Craig Jones
Managing Director & CEO
Thomas(Tommy) McKeith
Independent Non-Executive Director
James (Jim) Rutherford
Independent Non-Executive Director
PERSEUS MINING
39
EXECUTIVE MANAGEMENT TEAM
Craig Jones
Managing Director & CEO
25+ years global mining experience; former
Global COO, Newcrest
Lee-Anne de Bruin
Chief Financial Officer
25+ years senior finance & strategy roles incl.
Gem Diamonds, BHP, Newmont, Resolute
Mining
Wade Bickley
Chief Operating Officer
25+ years gold & base metals operations; former
GM, Obuasi Mine (AngloGold Ashanti)
Jacob Ricciardone
Chief Development Officer
Exploration, project development & technical
services; former VP Strategic Planning, Gold Fields
Melanie Pollard
Chief Corporate Affairs & Sustainability
Officer
15+ years international development &
resources sustainability, HR and stakeholder
engagement
Martijn Bosboom
General Counsel & Company Secretary
30+ years corporate & commercial law across
common law and civil law jurisdictions
Jordan Morrissey
General Manager People
18 + years of experience in the international
Mining Industry
PERSEUS MINING
40
CORPORATE STRUCTURE
Perseus Mining Limited
ASX / TSX: PRU · Perth, Western Australia
Edikan Gold Mine
Ghana
90% owned
10% free-carried – Government of
Ghana
Nyanzaga Gold Project
Tanzania
80% owned
20% free-carried – Government of
Tanzania
Yaouré Gold Mine
Côte d'Ivoire · incl. CMA U/G¹
90% owned
10% free-carried – Government of
Côte d'Ivoire
Guinea Greenfields
Exploration – Siguiri Basin²
100% owned
Pre-development – 15% free-carry
to Govt. of Guinea once a mining
company is established
Sissingué & Fimbiasso
Côte d'Ivoire
86% owned
10% free-carried Govt. + 4% local
interests
Bagoé Gold Project
Côte d'Ivoire
90% owned
10% free-carried – Government of
Côte d'Ivoire
STRATEGIC LISTED EQUITY HOLDINGS
Aurum Resources (ASX: AUE) – 9.5% interest Predictive Discovery Ltd (ASX:PDI) – 9.4% interest
¹ Côte d'Ivoire's first mechanised underground mine, within the Yaouré mining licence; commercial production targeted Q3 FY27. ² 5 Reconnaissance Licences granted in Q4 FY26 covering 497.8km² in the southern Siguiri
Basin, held via Perseus Guinea Holdings Pty Ltd / Perseus ERX Holdings Pty Ltd (both 100% Perseus).
PERSEUSMININGLIMITEDPERSEUSMINING.COM
3
APPENDIX 5
MINE STATISTICS &
HEDGING
PERSEUS MINING
42
MINE STATISTICS – QUARTERLY FY2026
YAOURÉCMA UG¹EDIKANSISSINGUÉ
PARAMETERUNITQ1Q2Q3Q4Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Gold Production & Sales
Total material minedkt
5,1987,1938,4997,8921541443,2322,4693,7103,4623,1092,7083,2502,637
Total ore minedkt
1,2761,1141,3491,29331907341,0531,6551,654258472567576
Average ore gradeg/t
1.771.011.151.062.853.070.850.920.850.821.501.861.912.06
Strip ratiot:t
3.15.55.35.1––3.41.31.21.111.04.74.73.6
Ore milledkt
93690590690421941,7321,7621,8841,864302392449411
Milled head gradeg/t
1.961.181.291.132.583.030.670.770.840.791.331.641.922.37
Gold recovery%
94.093.293.492.593.392.587.788.288.688.790.989.591.690.0
Gold producedoz
55,40532,04534,96030,4401,6068,47232,85638,35245,12341,94011,69218,49125,45528,161
Gold soldoz
57,44134,83536,28531,9949557,25231,27437,21943,98043,86812,87414,55315,04031,453
Average sales price$/oz
2,9593,2434,0063,9204,0063,9203,3373,7004,2844,3472,9533,2274,0593,890
Unit Production Costs
Mining cost
$/t
mined
4.353.873.554.03––5.397.535.887.044.896.095.906.99
Processing cost
$/t
milled
16.0615.7818.5115.65––9.168.858.278.8526.5916.2614.2817.61
G & A cost$M/mth
2.762.682.582.61––2.392.622.282.511.841.932.042.26
All-In Site Cost
Production cost$/oz
8291,5741,5641,768––1,2321,0979801,1552,4581,5451,2461,153
Royalties$/oz
306372369332––324387517733324279408334
Sub-total$/oz
1,1351,9461,9322,100––1,5551,4831,4971,8882,7821,8241,6541,487
Sustaining capital$/oz
53146117177––4852427144205463
Total All-In Site Cost$/oz
1,1882,0922,0492,277––1,6031,5351,5391,9592,8261,8441,7081,550
Notional Cashflow from
Operations
Cash margin$/oz
1,7711,1511,9571,643––1,7342,1652,7462,3881271,3832,3512,340
Notional cash flowUS$M
98376850––57831241001256066
Source: Perseus Mining Limited Quarterly Reports, September 2025, December 2025, March 2026 and June 2026 quarters (Q1–Q4 FY26). Yaouré figures exclude CMA Underground.
- CMA Underground was pre-commercial production throughout FY26; development only in Q1–Q2 (no ore mined or gold produced). First ore was mined in Q3 FY26 and stoping commenced in Q4 FY26.
Related mining, processing and royalty costs are capitalised. Capitalised mining, processing and royalty costs of $12.0 million ($1,656 per ounce) for Q4 FY26 and $1.3 million ($1,362 per ounce) for Q3 FY26
were recognised as cost of sales for the ounces sold for CMA UG.
PERSEUS MINING
43
MINE STATISTICS - FULL YEARS FY2024-FY2026
Source: Perseus Mining Limited Quarterly Reports (FY24, FY25, FY26). Yaouré figures exclude CMA Underground for FY24–FY26 open pit rows.
- CMA Underground is pre-commercial production; related mining, processing and royalty costs are capitalised. Figure shown for Total All-In Site Cost is cost of sales (US$/oz), not AISC. Capitalised mining,
processing and royalty costs of $13.3 million ($1,621 per ounce) for FY26 were recognised as cost of sales for the ounces sold for CMA UG.
YAOURÉEDIKANSISSINGUÉ
PARAMETERUNITFY24FY25FY26
CMA UG
FY26¹
FY24FY25FY26FY24FY25FY26
Gold Production & Sales
Total material minedMt
33.634.028.80.411.710.812.910.29.211.7
Total ore minedMt
5.38.95.00.17.36.15.11.51.11.9
Average ore gradeg/t
1.671.351.253.010.980.920.851.411.651.89
Strip ratiot:t
5.42.84.7–0.60.81.55.87.75.2
Ore milledMt
3.94.13.70.16.26.37.21.51.51.6
Milled head gradeg/t
2.172.101.392.951.060.970.771.421.361.85
Gold recovery%
92.993.493.492.691.789.888.390.989.490.5
Gold producedkoz
250.9262.2152.910.1195.1177.2158.364.057.183.8
Gold soldkoz
253.5258.0160.68.2191.7178.5156.363.557.873.9
Average sales price$/oz
2,0092,5533,4493,9302,0112,5643,9732,0412,4353,631
Unit Production Costs
Mining cost$/t mined
3.433.953.92–6.096.126.395.086.075.89
Processing cost$/t milled
13.5913.6716.49–10.7610.608.7715.9518.8918.05
G & A cost$M/mth
2.372.662.66–1.702.242.451.581.652.02
All-In Site Cost
Production cost$/oz
7828511,340–8139031,1071,4861,8091,450
Royalties$/oz
122176339–151210502130179342
Sub-total$/oz
9041,0281,679–9641,1131,6091,6151,9881,792
Sustaining capital$/oz
3974112–3746532510148
Total All-In Site Cost$/oz
9431,1011,791–1,0011,1591,6621,6412,0891,840
Notional Cashflow from
Operations
Cash margin$/oz
1,0661,4521,658–1,0101,4052,3114013461,791
Notional cash flowUS$M
267381253–1972493662620150
PERSEUS MINING
44
HEDGE POSITION UPDATE AS AT 30- JUNE-2026
Note:
1.Measured from 1 July to 30 June.
Hedge position as at 30-June-26
Perseus hedging programme focuses on
maintaining downside protection whilst retaining
as much upside opportunity as possible, while still
observing prudent cash management practices.
➢Committed hedge position
(1)
represented 7%
of forecast 3-year production as at 30 June
2026.
➢85k Call Strike prices range from US$3,146/oz
to US$4,659/oz.
➢200k Put Options (Uncommitted)
(2)
with an
average strike price of US$2,625/oz.
(1)Committed hedging means any hedging contract committing a party to deliver
an asset at a certain price, or to the payment of any certain loss, where delivery
is not made; includes Forwards and Call Options sold.
(2)Uncommitted Hedging means any transaction where cover against an adverse
movement is afforded but there is no delivery obligation or cost associated
other than a known upfront cost at trade entry.
PERSEUSMININGLIMITEDPERSEUSMINING.COM
3
APPENDIX 6
AFRICA & GOLD INSIGHTS
PERSEUS MINING
46
DISCOVERIES BY REGION/COUNTRY
West Africa ranks 1st for discoveries over past decades
For the period between 2010–2024 (in millions of ounces)
#1 Ranked
Gold Discoveries since 2010
60 Moz
Discovered since 2010
Source: S&P Global Market Intelligence.
West Africa includes Burkina Faso, Côte d’Ivoire, Ghana, Mali, Guinea and Senegal.
Perseus's operating countries, Côte
d’Ivoire (13.0 Moz) and Ghana (11.9
Moz), both rank inside the global top
15 for discoveries — within the
world’s most prospective gold region.
60.0Moz
38.8Moz
38.1Moz
33.8Moz
32.8Moz
29.0Moz
24.8Moz
18.1Moz
18.0Moz
16.7Moz
14.2Moz
13.0Moz
12.9Moz
11.9Moz
7.8Moz
6.8Moz
6.2Moz
5.9Moz
5.5Moz
4.4Moz
4.2Moz
4.1Moz
2.2Moz
West Africa
Ecuador
Canada
USA
Indonesia
Australia
Chile
China
Serbia
Burkina Faso
South Africa
Côte d'Ivoire
Mali
Ghana
DR Congo
Mexico
Russia
Guyana
Guinea
Brazil
Finland
Sudan
Turkey
PERSEUS MINING
47
DISCOVERY TO PRODUCTION BY COMMODITY
Average lead time from discovery to production, 2002–2023 (127 mines)
GOLD IS AMONG THE
FASTEST COMMODITIES
TO REACH PRODUCTION
Across the 127 mines in S&P Global's study,
gold mines reach production faster than
copper or nickel mines, and only marginally
slower than the smaller zinc sample.
15.2
Years — average lead time
for the 70 gold mines
in the study
Source: S&P Global Market Intelligence, “Discovery to production averages 15.7 years for 127 mines,” Paul Manalo, May 4, 2023 (via S&P Capital IQ Pro).
Figures reflect the full global sample for each commodity (127 mines that began production 2002–2023, discovered from 1980 onward); one silver mine included in the overall total
is not shown separately. S&P Global does not publish this study broken out by both commodity and country/region simultaneously — the country/region view (previous slide)
covers all commodities combined, and this commodity view is global only.
Gold
70 mines
15.2 yrs
15.7 yrs
Zinc
9 mines
15.7 yrs
All mines (avg.)
127 mines, all commodities
Copper
34 mines
16.2 yrs
Nickel
13 mines
17.5 yrs