|
Ioneer Ltd is a mining company focused on the development of the Rhyolite Ridge Lithium-Boron Project in Nevada, United States. The company mines and processes lithium and boron on-site to produce technical grade lithium carbonate and boric acid, which are used in permanent magnets, batteries, semiconductors, and military applications. Ioneer is advancing a strategic partnership process to secure an equity partner for the project's construction and has secured a loan from the U.S. Department of Energy to support the development of an on-site processing facility. The project is described as permitted and construction-ready, with detailed engineering design largely complete. Summarised from the company's own disclosures, fiscal year ended Dec 2025 |
Industry Materials | Homepage ioneer.com |
| Sector Basic Materials | IR page ioneer.com/investors | |
|
Tags
lithium, boron, lithium carbonate, boric acid, battery materials, critical minerals, greenfield mining, on-site processing, Rhyolite Ridge Lithium-Boron Project, Rhyolite Ridge
|
Press page — |
Metrics
| Valuation | |
|---|---|
| Market cap | A$ 271.822M |
| Market cap (USD) | $ 183.075M |
| P/E | -33.65 |
| PEG | — |
| P/BV | — |
| P/S | — |
| P/OCF | -40.23 |
| P/FCF | — |
| Dividend yield | — |
| Turnover / mcap | — |
| Returns | |
|---|---|
| ROE | -4.3% |
| ROI | -4.1% |
| ROIC | -4.1% |
| Profit margin | — |
| Growth | |
|---|---|
| Revenue growing | — |
| Profits growing | No |
| Revenue up 3y | — |
| Revenue up 5y | — |
| Earnings growth 3y (net profit CAGR) | — |
| Quality | |
|---|---|
| Profitable | No |
| Margin expanding | — |
| Buying back stock | — |
| Diluting (TTM) | — |
| Debt/Equity | — |
| Podcast bulls (TTM) | Sign up |
| Podcast bears (TTM) | Sign up |
| Podcast sentiment (TTM) | Sign up |
| Podcast sentiment % (TTM) | Sign up |
| News sentiment (TTM) | 0 |
| Quality score | -22.2% |
| Insiders | |
|---|---|
| Buys, 1w | Sign up |
| Buys, 1m | Sign up |
| Buys, 1y | Sign up |
| Sells, 1w | Sign up |
| Sells, 1m | Sign up |
| Sells, 1y | Sign up |
Podcast Mentions
Announcements lodged with ASX, newest first, routine forms (director and substantial-holding notices, daily buy-back and quotation notices) included. The link opens the announcement on ASX. Material events reported to the SEC on Form 8-K or 6-K, newest first. The link opens the filing itself on EDGAR. Press releases from the company's own website, newest first.
Appendix 2A - Application for quotation of securities 1 / 6 Announcement Summary Entity name IONEER LTD Announcement Type New announcement Date of this announcement Tuesday November 03, 2026 The +securities to be quoted are: Total number of +securities to be quoted ASX +security codeSecurity description Number of +securities to be quotedIssue date INRORDINARY FULLY PAID1,015,64802/11/2026 Refer to next page for full details of the announcement +Securities issued, transferred or re-classified as a result of options being exercised or other +convertible securities being converted
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 2 / 6 Part 1 - Entity and announcement details 1.1 Name of entity IONEER LTD We (the entity named above) apply for +quotation of the following +securities and agree to the matters set out in Appendix 2A of the ASX Listing Rules. 1.2 Registered number type ACN Registration number 098564606 1.3 ASX issuer code INR 1.4 The announcement is 1.5 Date of this announcement 3/11/2026 New announcement
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 3 / 6 Part 2 - Type of Issue 2.1 The +securities to be quoted are: 2.2 The +class of +securities to be quoted is: Additional +securities in a class that is already quoted on ASX ("existing class") +Securities issued, transferred or re-classified as a result of options being exercised or other +convertible securities being converted
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 4 / 6 Part 3B - number and type of +securities to be quoted (existing class) where issue has not previously been notified to ASX in an Appendix 3B Existing +securities converting into additional +securities in an existing class FROM (Existing Class) ASX +security code and description INRAS : PERFORMANCE RIGHTS TO (Existing Class) ASX +security code and description INR : ORDINARY FULLY PAID Please state the number of options that were exercised or other +convertible securities that were converted 1,015,648 The first date the options were exercised or other +convertible securities were converted 2/11/2026 The last date the options were exercised or other +convertible securities were converted 2/11/2026 Is this all of the options or other +convertible securities on issue of that type (ie have all of those options now been exercised or have all of those convertible securities now been converted)? The right of the holder of the options or other +convertible securities to receive the +underlying securities is being satisfied by: The underlying +securities being received by the holder are: Were the options being exercised or other +convertible securities being converted issued under an +employee incentive scheme? Are any of the options being exercised or other +convertible securities being converted held by +key management personnel (KMP) or an +associate? Provide details of the KMP or +associates who are exercising options or converting convertible securities Name of KMPName of registered holder Number of options being exercised or other +convertible securities being converted JAMES DERRICK CALAWAYJAMES DERRICK CALAWAY 263,316 ALAN JOHN DAVIESALAN JOHN DAVIES 188,083 ROSE MCKINNEY-JAMESROSE MCKINNEY-JAMES 188,083 MARGARET R WALKERMARGARET R WALKER 188,083 TIMOTHY WOODALLTIMOTHY WOODALL 188,083 Yes Yes Intended to be, but are not yet, quoted by ASX An issue of new +securities No
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 5 / 6 Issue date 2/11/2026 Will the +securities to be quoted rank equally in all respects from their issue date with the existing issued +securities in that class? Issue details Number of +securities to be quoted 1,015,648 Are the +securities being issued for a cash consideration? Please describe the consideration being provided for the +securities Nil - issued under an employee incentive plan Please provide an estimate (in AUD) of the value of the consideration being provided per +security for the +securities to be quoted 0.000000 Any other information the entity wishes to provide about the +securities to be quoted No Yes
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 6 / 6 Part 4 - Issued capital following quotation Following the quotation of the +securities the subject of this application, the issued capital of the entity will comprise: The figures in parts 4.1 and 4.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing. 4.1 Quoted +securities (total number of each +class of +securities quoted on ASX following the +quotation of the +securities subject of this application) ASX +security code and description Total number of +securities on issue INR : ORDINARY FULLY PAID3,088,884,996 4.2 Unquoted +securities (total number of each +class of +securities issued but not quoted on ASX) ASX +security code and description Total number of +securities on issue INRAS : PERFORMANCE RIGHTS60,986,769
Disclaimer 2 This presentation has been prepared as a summary only and does not contain all information about ioneer Ltds (ioneer or the Company) assets and liabilities, financial position and performance, profits and losses, prospects, and the rights and liabilities attaching to ioneer’s securities. The securities issued by ioneer are considered speculative and there is no guarantee that they will make a return on the capital invested, that dividends will be paid on the shares or that there will be an increase in the value of the shares in the future. ioneer does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this presentation. Recipients of this presentation should carefully consider whether the securities issued by ioneer are an appropriate investment for them in light of their personal circumstances, including their financial and taxation position. Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company's securities.
28 October 2026 : IONRwww.ioneer.comASX : INR
INVESTOR PRESENTATION
28 October 2026
: IONRwww.ioneer.comASX : INR
Disclaimer
2
This presentation has been prepared as a summary only and does not contain all information about ioneer Ltds
(ioneer or the Company) assets and liabilities, financial position and performance, profits and losses, prospects, and
the rights and liabilities attaching to ioneer’s securities. The securities issued by ioneer are considered speculative
and there is no guarantee that they will make a return on the capital invested, that dividends will be paid on the
shares or that there will be an increase in the value of the shares in the future.
ioneer does not purport to give financial or investment advice. No account has been taken of the objectives, financial
situation or needs of any recipient of this presentation. Recipients of this presentation should carefully consider
whether the securities issued by ioneer are an appropriate investment for them in light of their personal
circumstances, including their financial and taxation position. Investors should make and rely upon their own
enquiries before deciding to acquire or deal in the Company's securities.
Forward Looking Statements
Various statements in this presentation constitute statements relating to intentions, future acts and events which
are generally classified as “forward looking statements”. These forward-looking statements are not guarantees or
predictions of future performance and involve known and unknown risks, uncertainties and other important factors
(many of which are beyond the Company’s control) that could cause those future acts, events and circumstances to
differ materially from what is presented or implicitly portrayed in this presentation.
For example, future reserves described in this presentation may be based, in part, on market prices that may vary
significantly from current levels. These variations may materially affect the timing or feasibility of particular
developments.
Words such as “anticipates”, “expects”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “potential” and similar
expressions are intended to identify forward-looking statements.
ioneer cautions security holders and prospective security holders to not place undue reliance on these forward-
looking statements, which reflect the view of ioneer only as of the date of this presentation.
The forward-looking statements made in this presentation relate only to events as of the date on which the
statements are made. Except as required by applicable regulations or by law, ioneer does not undertake any
obligation to publicly update or review any forward-looking statements, whether as a result of new information or
future events. Past performance cannot be relied on as a guide to future performance.
Competent Persons Statement
In respect of Mineral Resources and Ore Reserves referred to in this presentation and previously reported by the Company
in accordance with JORC Code 2012, the Company confirms that it is not aware of any new information or data that
materially affects the information included in the public report titled “Further Leach Optimisation Enhances Project
Economics” dated 29 October 2025, released on ASX. Further information regarding the Mineral Resource estimate and Ore
Reserve can be found in that report. All material assumptions and technical parameters underpinning the estimates in the
report continue to apply and have not materially changed.
In respect of production targets referred to in this presentation, the Company confirms that it is not aware of any new
information or data that materially affects the information included in the public report titled “Further Leach Optimisation
Enhances Project Economics” dated 29 October. Further information regarding the production estimates can be found in
that report. All material assumptions and technical parameters underpinning the estimates in the report continue to apply
and have not materially changed.
No offer of securities
Nothing in this presentation should be construed as either an offer to sell or a solicitation of an offer to buy or sell ioneer
securities in any jurisdiction or be treated or relied upon as a recommendation or advice by ioneer.
Reliance on third party information
The views expressed in this presentation contain information that has been derived from publicly available sources that
have not been independently verified. No representation or warranty is made as to the accuracy, completeness or
reliability of the information. This presentation should not be relied upon as a recommendation or forecast by ioneer.
Lithium Carbonate Equivalent
The formula used for the Lithium Carbonate Equivalent (LCE) values quoted in this presentation is:
LCE = (lithium carbonate tonnes produced + lithium hydroxide tonnes produced * 0.880
Note
All $’s in this presentation are US$’s except where otherwise noted.
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR 3 Rhyolite Ridge Lithium-Boron Project
Ongoing engagement with U.S. Government and potential Strategic Partners Proven expansion potential – 549Mt Mineral Resource (MII), North and South Basins Fully permitted, shovel ready, with off-takes, and $1B low-cost US government debt 265Mt Ore Reserve (PP), Largest undeveloped boron reserve globally (ex-Turkey) 2 All-in sustaining cash cost of US$4,628 bottom quartile of global lithium cost curve 3 4 5 6 Strong and resilient economics Lithium-Boron Project – NPV = $2.3B, IRR = 23.2% (levered) 1 A construction-ready mining and processing development that is key to U.S. Critical Mineral onshoring
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR Rhyolite Ridge A Very Rare Lithium and Boron Deposit That will produce high-purity, refined chemicals in the U.S. 4
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR Boron – Key Facts •Commercially viable quantities found in very few places globally •Among the rarest ores on Earth •Southwest USA & Turkey account for ~80% of global production •Incredibly versatile, used in over 300 separate applications •Essential to modern life and critical for energy, defence and aerospace. •Defense Logistic Agency (DLA) Strategic Material •U.S. Government priority around magnets, batteries and semi- conductors 5
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR From Termites to Tanks Critical for Energy, Defense, Aerospace, Agriculture & Everyday Life 6 Aerospace & Defense Defense Communications Missile & Aerospace Systems Energy Agriculture Semiconductor / Electronics Glass & Chemicals NuclearArmor & Ballistics
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR Boron – A Global Business Sourced from Two Countries 7 •A 4Mt pa global business •Boron mine in California produces ~30% of world supply (1Mt pa) •DoD consumed over 35kt of boron carbide for military applications in 2023 •~73% boron reserves are found in Turkey Rhyolite Ridge •The only construction ready, DFS-complete, fully permitted boron deposit in the U.S. and possibly the world •~25% of revenue comes from boron ($100-200m per year)
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR 8 Driven by leach optimisation, new mine plan and increased production 1 See Company announcement titled “Further Leach Optimisation Enhances Project Economics” dated 29 October 2025. October 2025 1.5-day leach 1 Avg. Annual LCE Production (Years 1-25)24,500 tpa Avg. Annual Boric Acid Production (Years 1-25)135,000 tpa Ore Processed LOM265.5 Mt Ore Processed TPA3.4 Mt Ore Processed TPD10,500 t Unlevered NPV 8 $2,237 million Unlevered IRR18.0% Avg. Annual EBITDA LOM$417 million Avg. Annual Revenue LOM$608 million Life of Project77 years Capital Costs (AACE Class 2 estimate)$1,683.2 million Strong and Resilient Project Economics
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR : IONR Rhyolite Ridge at the Bottom of the Global Cost Curve : IONRwww.ioneer.com 9
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR 10 Substantially De-Risked Project 1 See announcement dated 25 October 2024 entitled “Rhyolite Ridge Lithium-Boron Project Receives Final Permit Approval”. 2 See announcement dated 20 January 2025 entitled “Rhyolite Ridge Lithium-Boron Project closes upsized US$996 million loan from U.S. Department of Energy to accelerate domestic critical mineral production”. Permitted Shovel Ready Offtakes In Place Low-Cost Debt 70% Engineering design complete •Industry leading partners •Proven technology & equipment •Technically led approach
-
- $200 m invested Lithium & Boron offtake Placed •Signed lithium offtakes with Ford, EcoPro, PPES and Dragonfly •Signed boron offtake and sales agreements U.S DOE loan for $996 million 2 •Low interest •Long tenor •Government loan Final Federal permit received in October 2024 1 •The BLM issued a positive Record of Decision (ROD) concluding the NEPA process
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR 11 Expansion Potential •Mineral Resource is limited to part of the South Basin as shown on the map •Further drilling in South and North Basins likely to result in increase to Mineral Resource Estimate •Multiple expansion options with potential to increase lithium and boron supply to meet growing demand Mineral Resource Estimate 1
GroupClassification Tonnes (M) Li (ppm) B (ppm) Li 2 CO 3 (wt. %) H 3 BO 3 (wt. %) Li 2 CO 3 (kt) H 3 BO 3 (kt) Combined Streams October 2025 Resource Mea + Ind440.31,4245,0260.762.873,33712,655 Inf108.31,3103,3840.701.937552,095 Total548.61,4014,7020.752.694,09214,750 1 See Company announcement titled “Further Leach Optimisation Enhances Project Economics” dated 29 October 2025 Resource
INVESTOR PRESENTATION
28 October 2026
: IONRwww.ioneer.comASX : INR
12
Strategic Partnering Process
•Strategic Partnering process involving a
minority sell-down of ioneer’s 100% interest in
Rhyolite Ridge, consortium approach
•Change of focus following inclusion of boron
on the U.S. critical minerals list combined with
trade negotiations with Korea and Japan
•Beneficiary of strong U.S. Government support
for domestic boron and lithium production
•Executed non-binding MoUs with the Korea
Investment Development Fund (KIND) and
Hyundai Engineering
•Conditional award from the U.S. Army to lease
land for a boron ceramics processing facility at
the Tooele Army Depot
•Nearing completion of process
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR 2026 – Advancing towards FID and development 13 1 Strategic partnering process to secure capable and committed equity partner(s) 2 Partnering process benefitting from favourable supply / demand dynamics in lithium and boron markets and the inclusion of boron on the U.S. critical minerals list 3 Ioneer represents direct exposure to the US onshoring thematic Closely coordinating with U.S. administration regarding the equity funding needs of the project 5 Strong Balance Sheet and fully funded through to FID and beyond 4 Advancing the project to full construction readiness, ensuring all technical and permitting requirements are met ahead of FID
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR 14 Key Takeaways Shovel Ready Expandable Robust Economics Dual Revenue Unique Deposit A rare, long-life, permitted, shovel ready project in the U.S. with strong government support A stable, secure, long-term supply of two products essential for batteries, magnets, semiconductors, nuclear and military applications Critical for the onshoring of refined lithium and boron Next Steps: Equity Financing, FID, Construction (36mths), First Production 2029
INVESTOR PRESENTATION
28 October 2026
: IONRwww.ioneer.comASX : INR
Corporate
Snapshot
15
Capital Structure
(As of 27 October 2026)
Shares Outstanding3.09b
Performance Rights And Options Outstanding75m
Cash Balance – 30 September 2026US$55m
Share Price ASX – 27 October 2026 A$0.10
ADR Price NASDAQ (1 ADR = 40 ASX Shares) US$2.73
Market Capitalisation – 27 October 2026A$285m
Research Coverage
Total Shareholder Composition
As at 30 June 2026
Total Shares by Geography
As at 30 June 2026
1
Cash balance is based off the latest quarterly information and is unaudited and unreviewed. See Quarterly Activities Report dated 27 October 2026.
Corporate Snapshot
52.4%
34.5%
7.7%
4.0%
0.6%
0.8%
Australia North America Asia Rest of Europe United Kingdom Rest of World 30.2% 24.1% 8.2% 6.0% 4.9% 2.4% 0.4% 23.8% p Institutional Investors Retail Corporation/Non-Profit Related Parties Unallocated DRs Broker Custodian Unanalysed
Appendix A: Supporting Materials
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR Proven Team with Extensive Lithium & Boron Experience 17 Experienced Board of Directors ALAN DAVIES Non-executive Director Former Chief Executive, Energy & Minerals of Rio Tinto ROSE McKINNEY-JAMES Non-executive Director Former President and CEO of Corporation for Solar Tech & Renewable Resources JAMES D. CALAWAY Executive Chair Former Non-executive chair of Orocobre Ltd MARGARET WALKER Non-executive Director Former VP Engineering and Technology Centers, Dow Chemical TIM WOODALL Non-executive Director 30 years’ experience in M&A and finance, specialising in the energy sector BERNARD ROWE Managing Director CEO & Founder Best-in-class Management Team with Industry Experience April Hashimoto Interim CFO MATT WEAVER Senior VP Engineering & Operations CHAD YEFTICH VP Corporate Development & External Affairs KEN COON VP Human Resources YOSHIO NAGAI VP Commercial Sales & Marketing
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR Q1Volcanic rocks and sandS5Siltstone S3SiltstoneG6Gritstone G4GritstoneL6Marl and carbonate M4White carbonate / clayLsiMarl and silicified marl G5GritstoneG7Gritstone (includes Diamictite) M5ClaystoneTlvLatite B5MarlTbxTuff breccia Overview of Rhyolite Ridge’s Geology 18 •Source: Rhyolite Ridge Feasibility Study OverviewRhyolite Ridge Lithology Overview Rhyolite Ridge is a geologically unique sediment-hosted, lithium-boron deposit that occurs within lacustrine sedimentary rocks of the South Basin, peripheral to the Silver Peak Caldera —It is one of only two major lithium-boron deposits globally and the only known deposit associated with the boron mineral, Searlesite The regional surface geology is characterized by relatively young Tertiary volcanic rocks —Tertiary rocks characterized by a series of interlayered sedimentary and volcanic rocks, which were deposited throughout west-central Nevada Precambrian and Cambrian rocks in the Silver Peak Range are composed of siltstones, claystone, quartzites, and carbonates —Outcrops of these rocks occur in the Mineral Ridge area of the Silver Peak Range, to the east of the Project area, and are variably metamorphosed and structurally deformed Looking Northeast Rhyolite Ridge Lithology Units Basin Outline Active Section 0m300m
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR Sedimentary Deposit Examples 19 Ioneer Rhyolite Ridge Li-B (Searlesite) Resource Rhyolite Ridge is only known occurrence of a Searlesite hosted lithium deposit CORE Other Li-Only (Clay) CORE Most common type of sedimentary deposit in North America
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR Acid Leach Results – Average Recoveries >84% 20 Stream 1 High Boron Stream 2 Low Boron Stream 3 ClayLow Boron 1,544 kt LCE1,888 kt LCE659 kt LCE1,000 – 3,000 kt LCE 1,624 ppm1,149 ppm2,029 ppm1,000 – 1,700 ppm 94% Li84% Li89% Li91% Li 300 +909035 South BasinBeacon Hill BEFORE LEACH AFTER LEACH Grade Recovery Li Contained #TEST
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR Proposed Rhyolite Ridge Process Plant 21 Ore Handling/ Sizing and Storage Sulphuric Acid Plant Vat Leach Plant Sulphur Supply Power Plant Plant Utilities Boric Acid Circuit Reagents Lithium Carbonate Circuit Evaporation/ Crystallization Engineering rendering of the Rhyolite Ridge Processing Plant
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR Well Understood and Proven Flow Sheet 22 Sulfuric Acid Plant Power Gen STG Steam SystemsWater SystemsOther UtilitiesReagents ROM Leach Boric Acid Crystallization Impurity Removal 1 Evaporation Crystallization Flotation Impurity Removal 2 Lithium Precipitation Evaporation 2 IR-2 Cake Recycle (RecycleReagent) SpentOre BoricAcid BAFlotationRecycle (BoronRecovery) FilterCake SulphateSalts Bleed SulphateSalts EVP-2 Brine (Li Recycle) Technical Grade Lithium Carbonate (Year 1-2) Battery Grade Lithium Hydroxide (Year 3+)
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR U.S. District Court Upholds Rhyolite Ridge Federal Permit •Following Issuance of Record of Decision in October 2024, litigation was brought by NGOs against federal agencies challenging Project approval •On March 30, 2026, the Court found that BLM and USFWS complied with NEPA and FLPMA in their review and approval of the project •On April 8, 2026, the same NGO groups announced that they will appeal the District Court decision to the 9 th Circuit Court •The Rhyolite Ridge Mine Plan of Operations was developed following a rigorous, science-based approach towards design over many years in consultation and collaboration with federal, state and local agencies and partners •Ioneer is confident the District Court decision will be affirmed on appeal and have no impact to construction schedule : IONR 23
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR South Basin Resource Estimate October 2025 24 StreamClassification Tonnage Ktonnes Li ppm B ppm Li 2 CO 3 Wt. % H 3 BO 3 Wt. % Contained Li 2 CO 3 (kt) H 3 BO 3 (kt) 1 Searlesite: High-boron lithium mineralisation (low clay content) Measured64,3851,75212,6690.937.246004,664 Indicated87,3721,55111,2800.836.457215,636 Inferred26,8771,55411,1010.836.352221,706 Total S1178,6341,62411,7540.866.721,54412,006 2 Low–boron lithium mineralisation (low clay content) Measured74,8591,1981,4610.640.84477626 Indicated164,7851,1211,4450.600.839831,362 Inferred69,2951,1618810.620.50428349 Total S2308,9391,1491,3230.610.761,8882,336 3 Low-boron lithium mineralisation (high clay content) Measured19,2232,2011,5501.170.89225170 Indicated29,7202,0851,1641.110.67330198 Inferred12,1181,6215790.860.3310540 Total S361,0612,0291,1691.080.67659408 ALLGrand Total548,6331,4014,7020.752.69 4,09214,750 1 See Company announcement titled “Further Leach Optimisation Enhances Project Economics” dated 29 October 2025.
INVESTOR PRESENTATION 28 October 2026 : IONRwww.ioneer.comASX : INR South Basin Ore Reserve Estimate October 2025 25 StreamClassification Tonnage Ktonnes Li ppm B ppm Li 2 CO 3 Wt. % H 3 BO 3 Wt. % Contained Li 2 CO 3 (kt) H 3 BO 3 (kt) 1 (>= 5,000 ppm B) Proven 39,4281,82313,2350.977.573832,984 Probable 51,8121,63211,6400.876.664503,448 Total S1 91,2411,71512,3290.917.058336,432 2 ($11.13/tonne net value cut-off grade, low clay) Proven 45,2001,2611,2980.670.74303335 Probable 103,8991,1151,3560.590.78617806 Total S2 149,0991,1591,3390.620.779201,141 3 ($11.13/tonne net value cut-off grade, High clay) Proven 7,0012,2051,6301.170.938265 Probable 18,1912,1101,1761.120.67204122 Total S3 25,1922,1371,3021.140.74286188 ALLGrand Total 265,5311,4435,1120.772.922,0397,761 1 See Company announcement titled “Further Leach Optimisation Enhances Project Economics” dated 29 October 2025.
For the period ending 30 September 2026
Highlights
• Strategic partnering process on track for year-end completion in line with counterparty approval timelines
• Commenced a drill program to further delineate the Rhyolite Ridge resource and provide geotechnical information for engineering
• Completed pre-feasibility study for a boron carbide plant at the Tooele Army Depot
• Company had US$54.55 million in cash at 30 September 2026 and is in a strong financial position through completion of the Strategic Partnering Process, a Final Investment Decision and Early Construction Works
27 October 2026 – Ioneer Ltd (“Ioneer” or the “Company”) (ASX: INR, Nasdaq: IONR), an emerging U.S. lithium-boron supplier, is pleased to report on its activities for the quarter ending 30 September 2026 (the “September 2026 Quarter”) and provide an update on the development of its 100%-owned Rhyolite Ridge Lithium-Boron Project (“Rhyolite Ridge” or the “Project”).
Bernard Rowe, Ioneer’s Managing Director, said, “During the third quarter, we continued to position Ioneer for a final investment decision (FID) and advanced our partnership with the U.S.
ABN 76 098 564 606 ASX: INR Nasdaq: IONR Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com
27 October 2026 – Ioneer Ltd (“Ioneer” or the “Company”) (ASX: INR, Nasdaq: IONR), an emerging U.S. lithium-boron supplier, is pleased to report on its activities for the quarter ending 30 September 2026 (the “ September 2026 Quarter”) and provide an update on the development of its 100%-owned Rhyolite Ridge Lithium-Boron Project (“ Rhyolite Ridge” or the “Project”).
Bernard Rowe, Ioneer’s Managing Director, said, “During the third quarter, we continued to position Ioneer for a final investment decision (FID) and advanced our partnership with the U.S. Army on a boron carbide plant to process boron from Rhyolite Ridge. As a result of counterparty approval timelines, we expect the strategic partnering process will now conclude in Q4. While this has taken longer than anticipated, we are encouraged by the strong and sustained interest in the project.
Ioneer continues to benefit from strong U.S. Government support for domestic boron and lithium production. The addition of boron to the U.S. critical minerals list, together with U.S. trade negotiations with Korea and Japan, further strengthens the Rhyolite Ridge Lithium-Boron Project.”
Government and Strategic Partner Engagement
On 8 July 2026, Ioneer signed non-binding Memorandums of Understanding (each an “MOU”) with the Korea
Overseas Infrastructure & Urban Development Corporation ("KIND"), the Republic of Korea’s specialized
public institution mandated by the Ministry of Land, Infrastructure and Transport ("MOLIT"), and Hyundai
Engineering Co. Ltd. ("Hyundai Engineering"), a leading Korean and international engineering, procurement
and construction company, to advance the development of Rhyolite Ridge.
Under the MOUs, KIND is considering making an equity investment in the Project, and Hyundai Engineering is considering the provision of certain procurement-related activities in connection with the Project. The MOUs QUARTERLY ACTIVITIES REPORT For the period ending 30 September 2026 Highlights • Strategic partnering process on track for year-end completion in line with counterparty approval timelines • Began engineering on the Rhyolite Ridge access road • Commenced a drill program to further delineate the Rhyolite Ridge resource and provide geotechnical information for engineering • Completed pre-feasibility study for a boron carbide plant at the Tooele Army Depot • Company had US$54.55 million in cash at 30 September 2026 and is in a strong financial position through completion of the Strategic Partnering Process, a Final Investment Decision and Early Construction Works
2
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com ABN 76 098 564 606 ASX: INR Nasdaq: IONR reflect Rhyolite Ridge's strategic value for both the United States and the Republic of Korea, and its role as a cornerstone of America's efforts to secure a domestic supply of urgently needed critical minerals.
The MOUs are non-binding and do not create legally enforceable obligations on the part of KIND and Hyundai Engineering to invest in or otherwise support the development of Rhyolite Ridge. There can be no certainty that legally binding arrangements will be entered into. Goldman Sachs & Co. LLC is assisting Ioneer with the strategic partnering process and the process is expected to conclude during the fourth quarter of 2026.
Rhyolite Ridge Permitting The Bureau of Land Management (“BLM”) issued a favourable Record of Decision (“ROD”) on 24 October 2024, authorizing the Plan of Operations and completing the National Environmental Policy Act (“NEPA”) process.
On 27 March 2026, the U.S. District Court for the District of Nevada (“U.S. District Court”) upheld the BLM decision to approve the Plan of Operations following a lawsuit brought by the Center for Biological Diversity, Great Basin Resource Watch, and Western Shoshone Defence Project (collectively, the “Plaintiffs”). In its decision, the Court found that the BLM and U.S. Fish and Wildlife Service (“USFWS”) complied with the Endangered Species Act, Federal Land Policy and Management Act, and NEPA in their review and approval of the Project.
On 9 April 2026, the Plaintiffs filed a notice of appeal of the U.S. District Court’s decision to the United States Court of Appeals for the Ninth Circuit.
The Company is actively participating in the appeal of the U.S. District Court’s decision upholding BLM’s approval of the Project. The Plaintiffs have filed their initial brief. The Company remains confident in its legal position and filed its response brief on 25 September 2026. The timing of the process is outside of the Company’s control; however, a decision is anticipated in mid-2027. The appeal is not expected to delay commencement of construction.
Sales & Marketing
Lithium Market and Price
Lithium supply continues to expand, with lithium chemical supply projected to reach 2,449 kt LCE in 2026, a
30% year-over-year increase; while on the demand side, global EV sales remain 16% higher than last year as
of July, according to Wood Mackenzie.
The strong price growth seen at the start of 2026 appears to have slowed, with lithium prices trending lower in late Q3. Lithium prices declined in Q3 2026, with battery-grade lithium carbonate and hydroxide down by 13.6% and 12.3%, respectively.
Lithium price forecasts reflect anticipated new supply entering the market through 2027, including speculation
about possible resumption of operations at the Jianxiawo lithium mine in China. Lithium prices are then
forecast to strengthen materially in the early 2030s as the market moves into deficit.
3
Suite 16.01
Level 16, 213 Miller Street
North Sydney NSW 2060
www.Ioneer.com
ABN 76 098 564 606
ASX: INR
Nasdaq: IONR
Boric Acid Market and Price
The boric acid market is reaching supply-demand equilibrium earlier than forecast, with stronger growth in
China and the closure of US boron producer Searles Valley Minerals affecting supply. Although the market is
not yet in deficit, there are indications of supply shortages and increases in prices.
China imported 217,000 tonnes of boric acid year-to -date to July 2026. Imports are expected to increase by
30-40,000 tonnes in 2026, from 320,000 tonnes to 350-360,000 tonnes, a 12.5% increase over the prior year,
which would more than offset declines in Korea and Taiwan as scheduled Thin-Film Transistor production shifts
to China. From June to July, China prices increased 13.7% and there has been a continuous global price increase
since Q1 across all suppliers and regions. This trend is expected to continue through 2027 and beyond,
eventually entering a market deficit.
Environmental, Health, Safety & Sustainability (EHSS) Program
Environmental Regulatory Compliance
Ioneer continues to maintain compliance with the issued State of Nevada Water Pollution Control Permit, Class
2 Air Permit and newly acquired State Reclamation permit. No compliance issues were noted during the
September 2026 Quarter and Ioneer continues to report ongoing monitoring and compliance related activities
as required under these obligations.
Health & Safety
During the quarter, Ioneer reported no lost time incidents, first aid incidents, or fatalities for employees.
Tiehm’s buckwheat
Tiehm’s buckwheat conservation efforts continued at the Company’s dedicated greenhouse in Nevada and
the federally approved introduction sites.
Ioneer continues to demonstrate the ability to grow and reproduce Tiehm’s buckwheat while advancing the goals of the Tiehm’s Buckwheat Protection Plan. The continued conservation efforts have created robust populations, while enhancing the redundancy, representation, and resilience of the species.
Ioneer is implementing the multi-year Tiehm's buckwheat Introduction Program as defined in the Tiehm’s Buckwheat Protection Plan. In April 2026, 35 plants were transplanted from the greenhouse to an approved introduction site after receiving approvals from the BLM and USFWS. Ioneer introduced an additional 35 plants and 400 seeds in mid-September 2026 as part of its Fall 2026 planting. Additional plantings at the approved introduction sites are planned for the Spring and Fall of 2027.
In the prior quarter, Ioneer successfully collected seeds from the wild Tiehm’s buckwheat population and transferred an estimated additional 12,000 to 15,000 seeds into long term storage at the approved seed bank. Between 2023 and 2026, Ioneer seed collection efforts have placed more than 20,000 seeds in the Rae Selling Berry Seed Bank at Portland State University in Oregon.
In August 2026, Ioneer submitted an application to the USFWS for a new Section 10(1)(a) Recovery Permit to support further implementation of the Introduction Program in alignment with the U.S. Fish and Wildlife Controlled Propagation Plan. The Recovery Permit will authorize species-specific research to improve germination and greenhouse propagation, which will then be used to evaluate and improve future planting at the approved introduction sites. Approval of the Recovery Permit is expected in Q4 2026.
4
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com ABN 76 098 564 606 ASX: INR Nasdaq: IONR
Community & Tribal Nations Ioneer continues to engage with local communities and Tribal Nations to address any environmental and social concerns and enhance local economic opportunities. Throughout the quarter, Ioneer continued its practice of briefing nearby county commissions and tribal councils to solicit feedback and provide project updates. In addition, Ioneer initiated coordination with area tribes seeking Tribal Cultural Monitors to observe the construction of exploration drill pads along with treatment and mitigation of cultural sites adjacent to the Project access corridor. Ioneer also was pleased to once again financially support seasonal community activities, such as Tribal Nations festivals and Fish Lake Valley community events.
Engineering
Following the signing of the Memorandum of Understanding between Ioneer and Hyundai Engineering
1
,
Ioneer and Hyundai Engineering have held several meetings to determine and define the opportunities to
apply the expertise and experience of Hyundai Engineering to advance the Project.
During the quarter, NewFields Companies, LLC designed and issued bid drawings for the Rhyolite Ridge Project access road. Construction is planned to commence before the end of the year.
Exploration Ioneer has submitted a work plan to the BLM for additional exploration activities in the South Basin. The work plan has been reviewed and approved by the BLM and authorizes approximately 10 acres of surface disturbance associated with the exploration program.
Ioneer began construction of the access roads and drill pads. The planned disturbance and associated activities are consistent with the requirements and authorizations established in the 2024 Record of Decision. The initial construction activities will prepare the site for the upcoming drilling program, with core drilling anticipated to begin in October 2026.
The additional drilling will provide important information to further define the limits of the mineral resource. It will also provide information that may contribute to further refinement and enhancement of the resource and reserve models.
In addition to resource definition, the core drilling will provide valuable subsurface information for geotechnical evaluation. The data collected will help improve the understanding of geological and geotechnical characteristics and support ongoing engineering, mine planning, and project development activities.
1 See Company announcement titled “Ioneer Signs MOUs with KIND and Hyundai Engineering to Advance Rhyolite Ridge Lithium-Boron Project” dated 8 July 2026.
5
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com ABN 76 098 564 606 ASX: INR Nasdaq: IONR Organic Growth Projects Ioneer continues to work with the U.S. Army to satisfy conditions of the conditional award granted to establish a critical mineral processing facility at the Tooele Army Depot. 2 During the quarter, Ioneer advanced discussions with the U.S. Army to lease approximately 50 acres at the Tooele Army Depot of Parcel TEAD-S 9, at the TEAD South Area in Utah. Ioneer met with the U.S. Army at that location to discuss the applicable project environmental permit requirements. Work required to obtain the required permits has commenced.
In September, Fluor Corporation issued a pre-feasibility study report that evaluated the development of a commercial-scale boron carbide (B4C) production facility at the Tooele Army Depot. The proposed facility would produce 10,000 tonnes per annum of 99.9% defence grade boron carbide for commercial sale from boron produced at Rhyolite Ridge.
Updated Project Timeline
Ioneer’s estimated timing* for Rhyolite Ridge is as follows:
Milestone Targeted timing* Note
Targeted completion of
Strategic Partner process
Q4 2026 The strategic partnering process is ongoing.
Targeted Final Investment
Decision
TBA Dependent on outcomes of Strategic
Partnering Process and requirement to
refresh Project economics.
Construction Circa 36 months Includes supply of long-lead items and
construction. Subject to lead times and
when orders are placed.
*As of the date of this quarterly, and subject to change.
Upcoming Work Program
The work program over the coming months includes:
• Complete the strategic partnering process for the Rhyolite Ridge Project
• Make a Final Investment Decision (FID)
• Prepare for commencement of construction
• Finalise agreement with Hyundai Engineering to provide procurement services
• Continue work with Hyundai Engineering to review potential Korean suppliers for the Project
• Advance permitting for a boron carbide plant at the Tooele Army depot
• Complete test work confirming economic assessment of selected stratigraphic units currently
classified as overburden waste in the mine plan potentially moving into the resource followed by a
potential resource update
2 See Company announcement titled “U.S. Army announces conditional awards for domestic critical mineral processing facilities to secure defense supply chains” dated 26 June 2026.
6
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com ABN 76 098 564 606 ASX: INR Nasdaq: IONR
ASX Additional Information The Company provides the following information pursuant to ASX Listing Rule requirements.
-
ASX LR 5.3.1: Exploration and Evaluation Expenditure during the quarter was US$2.67 million. Details of the exploration activity are set out in this report. A breakdown of the expenditure is below: Expenditure US$’000 Exploration 49 Engineering 665 Environmental 635 Sales & Marketing 198 Other 1,126 Total 2,673
-
ASX LR 5.3.2: The Company confirms there were no production or development activities during the quarter.
-
ASX LR 5.3.5: Related party payments for the quarter totalled US$354,899 comprising salaries, fees and payout of annual leave for the Company’s executive and non-executive directors. No other
payments were made to any related parties of the entity or their associates. -
ASX LR 5.3.3: INR confirms that there were 13 tenements at the Project that were not re-newed during the quarter. (see Appendix 1). Capital Structure Total cash and cash equivalents as of 30 September 2026, was US$54.55 million of which 96.0% was held in USD with the balance held in AUD. At the end of the quarter, Ioneer had on issue: • 3.09 billion ordinary shares, and • 74.94 million performance rights.
This ASX release has been authorised by Ioneer Managing Director Bernard Rowe.
—ENDS—
Media Contact
Chad Yeftich
Ioneer USA Corporation
Investor Relations (USA)
T: +1 775 993 8563
E: [email protected]
7
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com ABN 76 098 564 606 ASX: INR Nasdaq: IONR About Ioneer Ioneer Ltd. is an emerging lithium–boron producer and the 100% owner of the Rhyolite Ridge Lithium-Boron Project. Rhyolite Ridge is one of only a small number of lithium-boron ore deposits globally and a linchpin project in Nevada’s burgeoning Lithium Loop.
Rhyolite Ridge closed a US$996 million loan with the U.S. Department of Energy’s Energy Dominance Finance Program in January 2025. In October 2024, Ioneer received the final federal permit for the project from the Bureau of Land Management, concluding the formal federal permitting process which began in early 2020.
Ioneer signed separate offtake agreements with Ford Motor Company and Prime Planet Energy & Solutions (joint venture between Toyota and Panasonic) in 2022 and Korea’s EcoPro Innovation in 2021.
To learn more about Ioneer, visit www.Ioneer.com/investors or join our online communities on X, Facebook, LinkedIn, Instagram and YouTube.
Competent Persons Statement In respect of Mineral Resources and Ore Reserves referred to in this report and previously reported by the Company in accordance with JORC Code 2012, the Company confirms that it is not aware of any new information or data that materially affects the information included in the public report titled “Further Leach Optimisation Enhances Project Economics” dated 29 October 2025, released on ASX. Further information regarding the Mineral Resource estimate and Ore Reserve can be found in that report. All material assumptions and technical parameters underpinning the estimates in the report continue to apply and have not materially changed.
In respect of production targets referred to in this report, the Company confirms that it is not aware of any new information or data that materially affects the information included in the public report titled “Further Leach Optimisation Enhances Project Economics” dated 29 October 2025. Further information regarding the production estimates can be found in that report. All material assumptions and technical parameters underpinning the estimates in the report continue to apply and have not materially changed.
8
Suite 16.01
Level 16, 213 Miller Street
North Sydney NSW 2060
www.Ioneer.com
ABN 76 098 564 606
ASX: INR
Nasdaq: IONR
Recent Announcements
The table below lists announcements made by the Company during the quarter.
Date Released Title
13/08/2026 Half Yearly Report and Accounts
30/07/2026 June 2026 - Quarterly Cash Flow Report
30/07/2026 June 2026 - Quarterly Activities Report
08/07/2026 Ioneer Signs MOUs with KIND and Hyundai Engineering
06/07/2026 Change of Director's Interest Notice – Bernard Rowe
06/07/2026 Change of Director's Interest Notice – James Calaway
03/07/2026 Notification of Cessation of Securities – INR
03/07/2026 Application for Quotation of Securities – INR
9
ABN 76 098 564 606 ASX: INR Nasdaq: IONR Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com Appendix 1 - Schedule of Tenements ASX listing rule 5.3.3 Country Project Tenement ID Tenement Name Area (km 2 ) Interest at beginning of quarter Interest at end of quarter Note USA Rhyolite Ridge NMC1117360 SLB claims (199) 15.9 100% 100% No change USA Rhyolite Ridge NV105809159 SLB claims (18) 1.4 100% 100% No change USA Rhyolite Ridge NMC1171536 SLM claims (122) 9.6 100% 100% No change USA Rhyolite Ridge NMC 1179516 RR claims (65) 4.8 100% 100% No change USA Rhyolite Ridge NV105810398 RR claims (14) 1.1 100% 100% No change USA Rhyolite Ridge NV105272779 RMS mill sites (23) 0.5 100% 100% No change USA Rhyolite Ridge NV106354216 RMS mill sites (313) 6.2 100% 100% 13 tenements not re -newed USA Rhyolite Ridge NMC1147932 SLP claims (120) 9.6 100% 100% No change USA Rhyolite Ridge NV105272053 PR claims (11) 0.9 100% 100% No change USA Beacon Hill NMC1118666 NLB claims (160) 12.8 100% 100% No change USA Beacon Hill NV106310781 NLB claims (41) 3.3 100% 100% No change USA Beacon Hill NMC 1129523 BH claims (81) 6 100% 100% No change USA Radiator Springs NV106735396 COB claims (231) 18.5 100% 100% No change
Rule 5.5 ASX Listing Rules Appendix 5B (01/12/19) Page 1
- See chapter 19 of the ASX Listing Rules for defined terms. Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report Name of entity ioneer Ltd ABN Quarter ended (“current quarter”) 76 098 564 606 September 2026
Consolidated statement of cash flows
Current quarter
$US’000
Year to date
(9 months)
$US’000
- Cash flows from operating activities
1.1 Receipts from customers 1.2 Payments for
(a) exploration & evaluation (if expensed)
(b) development - -
(c) production - -
(d) staff costs (865) (2,217)
(e) administration and corporate costs (1,290) (3,919)
1.3 Dividends received (see note 3) - -
1.4 Interest received 576 1,073
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(1,579) (5,063)
- Cash flows from investing activities
2.1 Payments to acquire: (a) entities (b) tenements - - (c) property, plant and equipment - - (d) exploration & evaluation (if capitalised) (2,673) (6,951) (e) investments - - (f) other non-current assets - -
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 2
- See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows
Current quarter
$US’000
Year to date
(9 months) $US’000 2.2 Proceeds from the disposal of:
(a) entities (b) tenements - - (c) property, plant and equipment - - (d) investments - - (e) other non-current assets - - 2.3 Cash flows from loans to other entities - - 2.4 Dividends received (see note 3) - - 2.5 Other (provide details if material) - - 2.6 Net cash from / (used in) investing activities (2,673) (6,951)
- Cash flows from financing activities
- 50,400 3.1 Proceeds from issues of equity securities (excluding convertible debt securities) 3.2 Proceeds from issue of convertible debt securities
-
3.3 Proceeds from exercise of options - - 3.4 Transaction costs related to issues of equity securities or convertible debt securities
- (2,290) 3.5 Proceeds from borrowings - - 3.6 Repayment of borrowings - - 3.7 Transaction costs related to loans and borrowings
-
3.8 Dividends paid - - 3.9 Other (provide details if material) (76) (221) 3.10 Net cash from / (used in) financing activities (76) 47,889
- Net increase / (decrease) in cash and cash equivalents for the period
4.1 Cash and cash equivalents at beginning of period 58,840 17,863 4.2 Net cash from / (used in) operating activities (item 1.9 above) (1,579) (5,063) 4.3 Net cash from / (used in) investing activities (item 2.6 above) (2,673) (6,951) 4.4 Net cash from / (used in) financing activities (item 3.10 above) (76) 47,889
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 3
- See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows
Current quarter
$US’000
Year to date
(9 months) $US’000 4.5 Effect of movement in exchange rates on cash held 35 809 4.6 Cash and cash equivalents at end of period 54,547 54,547
- Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts
Current quarter
$US’000
Previous quarter
$US’000
5.1 Bank balances 10,025 11,074
5.2 Call deposits 44,522 47,766
5.3 Bank overdrafts - -
5.4 Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
54,547 58,840
- Payments to related parties of the entity and their associates Current quarter $US'000 6.1 Aggregate amount of payments to related parties and their associates included in item 1 355 6.2 Aggregate amount of payments to related parties and their associates included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for, such payments
Directors’ fees – 97.5 Executive salary component of chairman’s fee – 62.5 Wages – 125.5 Annual leave payout – 69.4
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 4
- See chapter 19 of the ASX Listing Rules for defined terms.
- Financing facilities Note: the term “facility’ includes all forms of financing arrangements available to the entity. Add notes as necessary for an understanding of the sources of finance available to the entity.
Total facility
amount at quarter
end
$US’000
Amount drawn at
quarter end
$US’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end - 7.6 Include in the box below a description of each facility above, including the lender, interest rate, maturity date and whether it is secured or unsecured. If any additional financing facilities have been entered into or are proposed to be entered into after quarter end, include a note providing details of those facilities as well.
-
Estimated cash available for future operating activities $US’000 8.1 Net cash from / (used in) operating activities (Item 1.9) (1,579) 8.2 Capitalised exploration & evaluation (Item 2.1(d)) (2,673) 8.3 Total relevant outgoings (Item 8.1 + Item 8.2) (4,252) 8.4 Cash and cash equivalents at quarter end (Item 4.6) 54,547 8.5 Unused finance facilities available at quarter end (Item 7.5) - 8.6 Total available funding (Item 8.4 + Item 8.5) 54,547 8.7 Estimated quarters of funding available (Item 8.6 divided by Item 8.3) 12.8 8.8 If Item 8.7 is less than 2 quarters, please provide answers to the following questions:
-
Does the entity expect that it will continue to have the current level of net operating cash flows for the time being and, if not, why not? Answer: N/A
-
Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its operations and, if so, what are those steps and how likely does it believe that they will be successful? Answer: N/A
-
Does the entity expect to be able to continue its operations and to meet its business objectives and, if so, on what basis? Answer: N/A
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 5
-
See chapter 19 of the ASX Listing Rules for defined terms. Compliance statement 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A. 2 This statement gives a true and fair view of the matters disclosed. 27 October 2026 Date: ...................................................................................
Bernard Rowe – Managing Director Authorised by: .................................................................................... (Name of body or officer authorising release – see note 4)
Notes
- This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
- If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report. - Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.
- If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – e.g. Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”. - If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.
Appendix 2A - Application for quotation of securities 1 / 7 Announcement Summary Entity name IONEER LTD Announcement Type New announcement Date of this announcement Tuesday October 06, 2026 The +securities to be quoted are: Total number of +securities to be quoted ASX +security codeSecurity description Number of +securities to be quotedIssue date INRORDINARY FULLY PAID225,00001/10/2026 Refer to next page for full details of the announcement +Securities issued under an +employee incentive scheme that are not subject to a restriction on transfer or that are to be quoted notwithstanding there is a restriction on transfer
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 2 / 7 Part 1 - Entity and announcement details 1.1 Name of entity IONEER LTD We (the entity named above) apply for +quotation of the following +securities and agree to the matters set out in Appendix 2A of the ASX Listing Rules. 1.2 Registered number type ABN Registration number 76098564606 1.3 ASX issuer code INR 1.4 The announcement is 1.5 Date of this announcement 6/10/2026 New announcement
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 3 / 7 Part 2 - Type of Issue 2.1 The +securities to be quoted are: 2.2 The +class of +securities to be quoted is: Additional +securities in a class that is already quoted on ASX ("existing class") +Securities issued under an +employee incentive scheme that are not subject to a restriction on transfer or that are to be quoted notwithstanding there is a restriction on transfer
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 4 / 7 Part 3B - number and type of +securities to be quoted (existing class) where issue has not previously been notified to ASX in an Appendix 3B Additional +securities to be quoted in an existing class issued under an +employee incentive scheme FROM (Existing Class) ASX +security code and description INRAS : PERFORMANCE RIGHTS TO (Existing Class) ASX +security code and description INR : ORDINARY FULLY PAID Please state the number of +securities issued under the +employee incentive scheme that are not subject to a restriction on transfer or that are to be quoted notwithstanding there is a restriction on transfer 225,000 Please provide details of a URL link for a document lodged with ASX detailing the terms of the +employee incentive scheme or a summary of the terms https://www.marketindex.com.au/asx/inr/announcements/notice-of-annual-general-meetingproxy-form-2A1552369 Are any of these +securities being issued to +key management personnel (KMP) or an +associate Issue date 1/10/2026 Will the +securities to be quoted rank equally in all respects from their issue date with the existing issued +securities in that class? Issue details Number of +securities to be quoted 225,000 Are the +securities being issued for a cash consideration? Please describe the consideration being provided for the +securities Nil - Vesting of employee performance rights Please provide an estimate (in AUD) of the value of the consideration being provided per +security for the +securities to be quoted 0.000000 Any other information the entity wishes to provide about the +securities to be quoted No No Yes No
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 5 / 7
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 6 / 7 Part 4 - Issued capital following quotation Following the quotation of the +securities the subject of this application, the issued capital of the entity will comprise: The figures in parts 4.1 and 4.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing. 4.1 Quoted +securities (total number of each +class of +securities quoted on ASX following the +quotation of the +securities subject of this application) ASX +security code and description Total number of +securities on issue INR : ORDINARY FULLY PAID3,087,869,348 4.2 Unquoted +securities (total number of each +class of +securities issued but not quoted on ASX) ASX +security code and description Total number of +securities on issue INRAS : PERFORMANCE RIGHTS62,002,417
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 7 / 7 Part 5 - Other Listing Rule requirements 5.1 Are the +securities being issued under an exception in Listing Rule 7.2 and therefore the issue does not need any security holder approval under Listing Rule 7.1? 5.1a Select the number of the applicable exception in Listing Rule 7.2 13 Yes
For the period ending 30 June 2026
Highlights
Highlights
● Signed non-binding Memorandums of Understanding to advance the development of Rhyolite Ridge.
● Received a conditional award from the United States Army for a long-term land lease on the Tooele Army Depot for the purpose of establishing a critical mineral processing facility.
● Ongoing engagement with U.S. Government and potential strategic partners.
● Completed pre-feasibility study to produce battery-grade lithium carbonate.
● Company in a strong financial position through completion of the Strategic Partnering Process, a Final Investment Decision and Early Construction Works.
30 July 2026 – Ioneer Ltd (“Ioneer” or the “Company”) (ASX: INR, Nasdaq: IONR), an emerging U.S. lithium-boron supplier, is pleased to report on its activities for the quarter ending 30 June 2026 (the “June 2026 Quarter”) and provide an update on the development of its 100%-owned Rhyolite Ridge Lithium-Boron Project (“Rhyolite Ridge” or the “Project”).
Bernard Rowe, Ioneer’s Managing Director, said, “The second quarter was one of continued momentum for Ioneer.
ABN 76 098 564 606 ASX: INR Nasdaq: IONR Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com
30 July 2026 – Ioneer Ltd (“Ioneer” or the “Company”) (ASX: INR, Nasdaq: IONR), an emerging U.S. lithium-
boron supplier, is pleased to report on its activities for the quarter ending 30 June 2026 (the “
June 2026
Quarter”) and provide an update on the development of its 100%-owned Rhyolite Ridge Lithium-Boron
Project (“
Rhyolite Ridge” or the “Project”).
Bernard Rowe, Ioneer’s Managing Director, said, “The second quarter was one of continued momentum for
Ioneer. We are pleased to be working with KIND and Hyundai Engineering to advance Rhyolite Ridge to
construction, create American jobs and bring two critical minerals, lithium and boron, to market.”
Government and Strategic Partner Engagement
On 8 July 2026, Ioneer signed non-binding Memorandums of Understanding (each an “MOU”) with the Korea
Overseas Infrastructure & Urban Development Corporation ("KIND"), the Republic of Korea’s specialized
public institution mandated by the Ministry of Land, Infrastructure and Transport ("MOLIT"), and Hyundai
Engineering Co. Ltd. ("Hyundai Engineering"), a leading Korean and international engineering, procurement
and construction company, to advance the development of Rhyolite Ridge.
Under the MOUs, KIND is considering making an equity investment in the Project, and Hyundai Engineering is
considering the provision of certain procurement-related activities in connection with the Project. The MOUs
reflect Rhyolite Ridge's strategic value for both the United States and the Republic of Korea, and its role as a
cornerstone of America's efforts to secure a domestic supply of urgently needed critical minerals.
The MOUs are non-binding and do not create legally enforceable obligations on the part of KIND and
Hyundai Engineering to invest in or otherwise support the development of Rhyolite Ridge. There can be no
certainty that legally binding arrangements will be entered into.
QUARTERLY ACTIVITIES REPORT
For the period ending 30 June 2026
Highlights
• Signed non-binding Memorandums of Understanding to advance the development of Rhyolite Ridge.
• Received a conditional award from the United States Army for a long-term land lease on the Tooele
Army Depot for the purpose of establishing a critical mineral processing facility.
• Ongoing engagement with U.S. Government and potential strategic partners.
• Completed pre-feasibility study to produce battery-grade lithium carbonate.
• Company in a strong financial position through completion of the Strategic Partnering Process, a Final
Investment Decision and Early Construction Works.
2
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com ABN 76 098 564 606 ASX: INR Nasdaq: IONR Goldman Sachs & Co. LLC is assisting Ioneer with the strategic partnering process and the process is expected to conclude during the third quarter of 2026.
Rhyolite Ridge Permitting The Bureau of Land Management (“BLM”) issued a favourable Record of Decision (“ROD”) on 24 October 2024, authorizing the Plan of Operations and completing the National Environmental Policy Act (“NEPA”) process.
On 27 March 2026, the U.S. District Court for the District of Nevada (“U.S. District Court”) upheld the BLM decision to approve the Plan of Operations following a lawsuit brought by the Center for Biological Diversity, Great Basin Resource Watch, and Western Shoshone Defence Project (collectively, the “Plaintiffs”). In its decision, the Court found that the BLM and U.S. Fish and Wildlife Service complied with the Endangered Species Act, Federal Land Policy and Management Act, and National Environmental Policy Act in their review and approval of the Project.
On 9 April 2026, the Plaintiffs filed a notice of appeal of the U.S. District Court’s decision to the United States Court of Appeals for the Ninth Circuit.
The Company is actively participating in the appeal of the U.S. District Court’s decision upholding BLM’s approval of the Project. The Plaintiffs have filed their initial brief. The Company remains confident in its legal position and expects to file its response briefs in September 2026. The timing of the process is outside of the Company’s control; however, a decision is anticipated in mid-2027. The appeal is not expected to delay commencement of construction.
Sales & Marketing Lithium Market and Price
Lithium markets remain materially stronger to date in 2026 than 2025. There has been a shift in demand from lithium hydroxide to lithium carbonate, driven by cost and performance considerations and reflecting changes in battery chemistry and regional needs. Refined lithium supply is expected to reach 2,681 kt LCE in 2026, up 28% over 2025, but resource supply is projected to grow by only 13%, according to Wood Mackenzie.
Lithium prices rose in Q2 2026, with battery-grade lithium carbonate and lithium hydroxide prices up 14%
quarter-over-quarter. Lithium prices are expected to strengthen materially in the early 2030s as the market
moves into deficit, which coincides with when Rhyolite Ridge is currently expected to commence production.
Based on Fastmarkets spot prices, the median CIF CJK Asia prices for battery-grade lithium carbonate and
lithium hydroxide were slightly lower as of 30 June 2026, at US$19,500/tonne and US$19,250/tonne,
respectively, compared with 31 March 2026 prices of US$21,000/tonne and US$20,250/tonne.
Boric Acid Market and Price
Ioneer forecasts growth in global demand for boric acid driven by its applications in consumer electronics (Thin
Film Transistor display glass substrates), the military (ferroboron and boron carbide) and the construction
industry (insulation and ceramics), reaching 1,207 KT/pa in 2026. Current utilization of global capacity is
3
Suite 16.01
Level 16, 213 Miller Street
North Sydney NSW 2060
www.Ioneer.com
ABN 76 098 564 606
ASX: INR
Nasdaq: IONR
estimated to be 80% and historical data suggest s a sustainable utilization rate of 85%. Ioneer forecasts
utilization to rise to 88% by 2032, 92% by 2034, 94% by 2036 and to exceed 100% by 2037.
Trade statistics show Asian boric acid prices rose 4-6% in Q1 2026 and continued to slightly increase in Q2
2026 due to higher costs, while US prices remained stable. Prices are likely to rise as demand and capacity
tighten.
Environmental, Health, Safety & Sustainability (EHSS) Program
Environmental Regulatory Compliance
Ioneer continues to maintain compliance with the issued State of Nevada Water Pollution Control Permit,
Class 2 Air Permit and newly acquired State Reclamation permit. No compliance issues were noted during
the June 2026 Quarter and Ioneer continues to report ongoing monitoring and compliance related activities
as required under these obligations.
Health & Safety
During the quarter, Ioneer reported no lost time incidents, first aid incidents, or fatalities for Ioneer
employees.
Tiehm’s buckwheat
Tiehm’s buckwheat conservation efforts continued at the Company’s dedicated greenhouse in Nevada and
the federally approved introduction sites.
Ioneer has successfully completed the first phase of its multi-year Tiehm's buckwheat introduction program. In April 2026, 35 plants were transplanted from the greenhouse to an approved introduction site after receiving all necessary approvals from the BLM and U.S. Fish and Wildlife Service. The plants have demonstrated strong survival and early growth. The Company’s monitoring program is ongoing. Rodent enclosures have been proven effective at protecting the transplanted plants. A second planting of an additional 35 plants and seed previously collected from the greenhouse is scheduled for September 2026.
The Company continues to demonstrate the ability to grow and reproduce Tiehm’s buckwheat while advancing the goals of the Tiehm’s Buckwheat Protection Plan. The continued conservation efforts have created robust populations, while enhancing the redundancy, representation, and resilience of the species.
As outlined in the Tiehm’s buckwheat protection plan, the Company completed its annual demographic and population surveys with initial results indicating robust populations compared to the previous few years of drought conditions. In line with action permitted by the BLM and U.S. Fish and Wildlife Service, Ioneer successfully conducted a seed collection from the wild population.
Community & Tribal Nations
Ioneer continues to engage with local communities and Tribal Nations to address any environmental and
social concerns and enhance local economic opportunities. Throughout the quarter, Ioneer continued its
practice of briefing nearby county commissions and tribal councils to solicit feedback and provide project
updates. Ioneer also was pleased to once again financially support seasonal community activities, such as
Tribal Nations festivals, the Nevada Mining Championships and the Fish Lake Valley 4
th
of July Festival.
Engineering
Ioneer completed a pre-feasibility study for a battery-grade lithium carbonate (Li
2
CO
3
) circuit, which
4
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com ABN 76 098 564 606 ASX: INR Nasdaq: IONR confirmed the feasibility to produce battery grade Li 2 CO 3 . This work complements the currently planned production of technical grade Li 2 CO 3 and lithium hydroxide as described in the Updated Ore Reserve and Project Economics announced on 13 June 2025, which was followed by further material improvements in project economics announced in September 2025 and October 2025 1 .
In the second half of 2025, Ioneer undertook a coordinated effort to consolidate storage of all Project drill core, coarse reject, and pulp storage at a centralized facility in Reno. This consolidation improved inventory management by establishing a detailed database of available materials, ensuring efficient access for ongoing studies and analysis. As part of this process, Ioneer completed a targeted sampling campaign to address data gaps associated with previously unsampled L6 and S5 stratigraphic units, increasing confidence in the Stream 2 ore for the resource and reserve estimates. In addition, Ioneer identified two stratigraphic zones (S3 and M4) as potential resource horizons that had previously limited analysis. These strata, currently classified as overburden, are set to be mined in order to access the underlying ore. The two zones were sampled and submitted for assay to further evaluate their economic potential.
In total, approximately 8,500 feet of core was split and submitted for analytical testing. The assay results will support additional metallurgical test work to better understand the characteristics, recovery potential, and overall value contribution of these materials to the Project. The results will also be incorporated into future resource modeling efforts and considered as part of the next Mineral Resource and Reserve update to further refine the understanding of the resource extent and geological continuity.
Boron Carbide Ioneer has engaged Fluor Corporation to prepare a pre-feasibility study to evaluate the feasibility of building a plant to produce defence-grade boron carbide from boron produced at Rhyolite Ridge. The pre-feasibility study is 95% completed and the report is expected to be issued in Q3 2026.
Organic Growth Projects
On 26 Ju ne 2026, Ioneer announced the receipt of a conditional award from the United States Army for a
long-term land lease on the Tooele Army Depot for the purpose of establishing a facility to produced
advanced boron products.
In November 2025, the U.S. Government added boron to its list of critical minerals. The United States,
including the Department of War, has long recognized boron as essential to national security and energy
dominance because boron ceramics (i.e., boron carbide and boron nitride) are essential for military
applications, including advanced armour, high-strength permanent magnets, semiconductors and nuclear
applications.
Ioneer will be working with the United States Army in the coming months to satisfy conditions of the award
and help forge a secure, domestic supply chain for critical minerals that underpin national defence and
security.
EcoPro Lithium Clay Project
1 See Company announcements titled “Clarification to Ore Reserves and Mineral Resource Estimate” dated 13 June 2025, “Leach Optimization and New Mine Plan Yields Material Improvement in Project Economics” dated 3 September 2025 and “Further Leach Optimization Enhances Project Economics” dated 29 October 2025.
5
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com ABN 76 098 564 606 ASX: INR Nasdaq: IONR EcoPro completed its Lithium Clay Research & Development project and a final project report has been prepared, which includes a process flow sheet developed with commercially feasible operating costs.
Corporate Activities Shelf Prospectus The Company filed a Form F-3 shelf prospectus with Securities and Exchange Commission on 20 July 2026, which gives Ioneer the ability to issue debt or equity securities in the United States in the future. Ioneer has no current plans to issue securities in the United States and has taken this step solely as a proactive measure to maintain future strategic flexibility. Annual General Meeting The Annual General Meeting was held on 21 May 2026 for the six month period ending 31 December 2025, as part of the transition from a 30 June year-end to a 31 December year-end as approved by the Board of Directors on 25 September 2025. All resolutions were carried without amendment.
Update to Estimated Project Timeline
Ioneer’s estimated timing* for Rhyolite Ridge is as follows:
Milestone Targeted timing* Note
Targeted completion of
Strategic Partner process
Q3 2026 The strategic partnering process is ongoing.
Targeted Final Investment
Decision
TBA Dependent on outcomes of Strategic
Partnering Process and requirement to
refresh Project economics.
Construction Circa 36 months
Includes supply of long-lead items and
construction. Subject to lead times and
when orders are placed.
*As of the date of this quarterly, and subject to change.
Upcoming Work Program
The work program over the coming months includes:
• Complete the strategic partnering process for the Rhyolite Ridge Project
• Make a Final Investment Decision (FID)
• Prepare for commencement of construction
• Finalise agreement with Hyundai Engineering to provide procurement services
• Continue work with Hyundai Engineering to review potential Korean suppliers for the Project
• Complete the Pre-Feasibility Study (PFS) regarding the boron carbide plant and work with the
United States Army to satisfy conditions related to the award received to lease land at the Tooele
Army depot
• Test work confirming economic assessment of selected stratigraphic units currently classified as
overburden waste in the mine plan potentially moving into the resource followed by a potential
6
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com ABN 76 098 564 606 ASX: INR Nasdaq: IONR resource update.
ASX Additional Information The Company provides the following information pursuant to ASX Listing Rule requirements.
-
ASX LR 5.3.1: Exploration and Evaluation Expenditure during the quarter was US$2.49 million. Details of the exploration activity are set out in this report. A breakdown of the expenditure is shown below: Expenditure US$’000 Exploration 0 Engineering 1,270 Environmental 577 Sales & Marketing 127 Other 511 Total 2,485
-
ASX LR 5.3.2: The Company confirms there were no production or development activities during the quarter.
-
ASX LR 5.3.5: Related party payments for the quarter totalled US$276,821 comprising salaries and fees for the Company’s executive and non-executive directors. No other payments were made to
any related parties of the entity or their associates. -
ASX LR 5.3.3: INR confirms that it has not acquired tenements during the quarter (see Appendix 1). Capital Structure Total cash and cash equivalents as of 30 June 2026, was US$58.84 million of which 94.2% was held in USD with the balance held in AUD.
At the end of the quarter, Ioneer had on issue: • 3.07 billion ordinary shares, and • 77.3 million performance rights.
This ASX release has been authorised by Ioneer Managing Director, Bernard Rowe.
—ENDS—
Media Contact
Chad Yeftich
Ioneer USA Corporation
Investor Relations (USA)
T: +1 775 993 8563
E: [email protected]
7
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com ABN 76 098 564 606 ASX: INR Nasdaq: IONR About Ioneer Ioneer Ltd. is an emerging lithium–boron producer and the 100% owner of the Rhyolite Ridge Lithium-Boron Project. Rhyolite Ridge is one of only a small number of lithium-boron ore deposits globally and a linchpin project in Nevada’s burgeoning Lithium Loop.
Rhyolite Ridge closed a US$996 million loan with the U.S. Department of Energy’s Energy Dominance Finance Program in January 2025. In October 2024, Ioneer received the final federal permit for the project from the Bureau of Land Management, concluding the formal federal permitting process which began in early 2020.
Ioneer signed separate offtake agreements with Ford Motor Company and Prime Planet Energy & Solutions (joint venture between Toyota and Panasonic) in 2022 and Korea’s EcoPro Innovation in 2021.
To learn more about Ioneer, visit www.Ioneer.com/investors or join our online communities on X, Facebook, LinkedIn, Instagram and YouTube.
Competent Persons Statement In respect of Mineral Resources and Ore Reserves referred to in this report and previously reported by the Company in accordance with JORC Code 2012, the Company confirms that it is not aware of any new information or data that materially affects the information included in the public report titled “Further Leach Optimisation Enhances Project Economics” dated 29 October 2025, released on ASX. Further information regarding the Mineral Resource estimate and Ore Reserve can be found in that report. All material assumptions and technical parameters underpinning the estimates in the report continue to apply and have not materially changed.
In respect of production targets referred to in this report, the Company confirms that it is not aware of any new information or data that materially affects the information included in the public report titled “Further Leach Optimisation Enhances Project Economics” dated 29 October 2025. Further information regarding the production estimates can be found in that report. All material assumptions and technical parameters underpinning the estimates in the report continue to apply and have not materially changed.
8
Suite 16.01
Level 16, 213 Miller Street
North Sydney NSW 2060
www.Ioneer.com
ABN 76 098 564 606
ASX: INR
Nasdaq: IONR
Recent Announcements
The table below lists announcements made by the Company during the quarter.
Date Released Title
07/04/2026 Change in substantial holding
20/04/2026 Notice of Annual General Meeting/Proxy Form
30/04/2026 March 2026 – Quarterly Activities Report
30/04/2026 March 2026 – Quarterly Cash Flow Report
30/04/2026 March 2026 – Quarterly Activities Report – Correction
30/04/2026 March 2026 – Quarterly Activities Report – Correction
01/05/2026 Change in substantial holding
21/05/2026 2026 AGM – Executive Chairs Address
21/05/2026 2026 AGM – Managing Director Presentation
21/05/2026 2026 AGM – Results of AGM
09/06/2026 Notification regarding unquoted securities – INR
12/06/2026 Change in Director’s Interest Notice – James Calaway
12/06/2026 Change in Director’s Interest Notice – Alan Davies
12/06/2026 Change in Director’s Interest Notice – Margaret Walker
12/06/2026 Change in Director’s Interest Notice – Rose McKinney James
12/06/2026 Change in Director’s Interest Notice – Tim Woodall
23/06/2026 Strategic Letters of Intent with KIND and Hyundai
26/06/2026 Conditional Award from the US Army Received
9
ABN 76 098 564 606 ASX: INR Nasdaq: IONR Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com Appendix 1 - Schedule of Tenements ASX listing rule 5.3.3 Country Project Tenement ID Tenement Name Area (km 2 ) Interest at beginning of quarter Interest at end of quarter Note USA Rhyolite Ridge NMC1117360 SLB claims (199) 15.9 100% 100% No change USA Rhyolite Ridge NV105809159 SLB claims (18) 1.4 100% 100% No change USA Rhyolite Ridge NMC1171536 SLM claims (122) 9.6 100% 100% No change USA Rhyolite Ridge NMC 1179516 RR claims (65) 4.8 100% 100% No change USA Rhyolite Ridge NV105810398 RR claims (14) 1.1 100% 100% No change USA Rhyolite Ridge NV105272779 RMS mill sites (23) 0.5 100% 100% No change USA Rhyolite Ridge NV106354216 RMS mill sites (325) 6.5 100% 100% No change USA Rhyolite Ridge NMC1147932 SLP claims (120) 9.6 100% 100% No change USA Rhyolite Ridge NV105272053 PR claims (11) 0.9 100% 100% No change USA Beacon Hill NMC1118666 NLB claims (160) 12.8 100% 100% No change USA Beacon Hill NV106310781 NLB claims (41) 3.3 100% 100% No change USA Beacon Hill NMC 1129523 BH claims (81) 6 100% 100% No change USA Radiator Springs NV106735396 COB claims (231) 18.5 100% 100% No change
Rule 5.5 ASX Listing Rules Appendix 5B (01/12/19) Page 1
- See chapter 19 of the ASX Listing Rules for defined terms. Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report Name of entity ioneer Ltd ABN Quarter ended (“current quarter”) 76 098 564 606 June 2026
Consolidated statement of cash flows
Current quarter
$US’000
Year to date
(6 months)
$US’000
- Cash flows from operating activities
1.1 Receipts from customers 1.2 Payments for
(a) exploration & evaluation (if expensed)
(b) development - -
(c) production - -
(d) staff costs (683) (1,353)
(e) administration and corporate costs (1,154) (2,364)
1.3 Dividends received (see note 3) - -
1.4 Interest received 384 497
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(1,453) (3,220)
- Cash flows from investing activities
2.1 Payments to acquire: (a) entities (b) tenements - - (c) property, plant and equipment - - (d) exploration & evaluation (if capitalised) (2,485) (4,542) (e) investments - - (f) other non-current assets - -
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 2
- See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows
Current quarter
$US’000
Year to date
(6 months) $US’000 2.2 Proceeds from the disposal of:
(a) entities (b) tenements - - (c) property, plant and equipment - - (d) investments - - (e) other non-current assets - - 2.3 Cash flows from loans to other entities - - 2.4 Dividends received (see note 3) - - 2.5 Other (provide details if material) - - 2.6 Net cash from / (used in) investing activities (2,485) (4,542)
- Cash flows from financing activities
- 50,400 3.1 Proceeds from issues of equity securities (excluding convertible debt securities) 3.2 Proceeds from issue of convertible debt securities
-
3.3 Proceeds from exercise of options - - 3.4 Transaction costs related to issues of equity securities or convertible debt securities
- (2,290) 3.5 Proceeds from borrowings - - 3.6 Repayment of borrowings - - 3.7 Transaction costs related to loans and borrowings
-
3.8 Dividends paid - - 3.9 Other (provide details if material) (76) (145) 3.10 Net cash from / (used in) financing activities (76) 47,965
- Net increase / (decrease) in cash and cash equivalents for the period
4.1 Cash and cash equivalents at beginning of period 61,863 17,863 4.2 Net cash from / (used in) operating activities (item 1.9 above) (1,453) (3,220) 4.3 Net cash from / (used in) investing activities (item 2.6 above) (2,485) (4,542) 4.4 Net cash from / (used in) financing activities (item 3.10 above) (76) 47,965
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 3
- See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows
Current quarter
$US’000
Year to date
(6 months) $US’000 4.5 Effect of movement in exchange rates on cash held 991 774 4.6 Cash and cash equivalents at end of period 58,840 58,840
- Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts
Current quarter
$US’000
Previous quarter
$US’000
5.1 Bank balances 11,074 1,749
5.2 Call deposits 47,766 60,114
5.3 Bank overdrafts - -
5.4 Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
58,840 61,863
- Payments to related parties of the entity and their associates Current quarter $US'000 6.1 Aggregate amount of payments to related parties and their associates included in item 1 277 6.2 Aggregate amount of payments to related parties and their associates included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for, such payments
Directors’ fees – 97.5 Executive salary component of chairman’s fee – 62.5 Wages – 116.8
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 4
- See chapter 19 of the ASX Listing Rules for defined terms.
- Financing facilities Note: the term “facility’ includes all forms of financing arrangements available to the entity. Add notes as necessary for an understanding of the sources of finance available to the entity.
Total facility
amount at quarter
end
$US’000
Amount drawn at
quarter end
$US’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end - 7.6 Include in the box below a description of each facility above, including the lender, interest rate, maturity date and whether it is secured or unsecured. If any additional financing facilities have been entered into or are proposed to be entered into after quarter end, include a note providing details of those facilities as well.
-
Estimated cash available for future operating activities $US’000 8.1 Net cash from / (used in) operating activities (Item 1.9) (1,453) 8.2 Capitalised exploration & evaluation (Item 2.1(d)) (2,485) 8.3 Total relevant outgoings (Item 8.1 + Item 8.2) (3,938) 8.4 Cash and cash equivalents at quarter end (Item 4.6) 58,840 8.5 Unused finance facilities available at quarter end (Item 7.5) - 8.6 Total available funding (Item 8.4 + Item 8.5) 58,840 8.7 Estimated quarters of funding available (Item 8.6 divided by Item 8.3) 14.9 8.8 If Item 8.7 is less than 2 quarters, please provide answers to the following questions:
-
Does the entity expect that it will continue to have the current level of net operating cash flows for the time being and, if not, why not? Answer: N/A
-
Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its operations and, if so, what are those steps and how likely does it believe that they will be successful? Answer: N/A
-
Does the entity expect to be able to continue its operations and to meet its business objectives and, if so, on what basis? Answer: N/A
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (01/12/19) Page 5
-
See chapter 19 of the ASX Listing Rules for defined terms. Compliance statement 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A. 2 This statement gives a true and fair view of the matters disclosed. 30 July 2026 Date: ...................................................................................
Bernard Rowe – Managing Director Authorised by: .................................................................................... (Name of body or officer authorising release – see note 4)
Notes
- This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
- If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report. - Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.
- If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – e.g. Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”. - If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.
Rhyolite Ridge Lithium-Boron Project
8 July 2026 – SYDNEY, Australia – Ioneer Ltd ("Ioneer" or "Company") (ASX: INR, NASDAQ: IONR) announced the signing of non-binding Memorandums of Understanding (each a "MOU") with the Korea Overseas Infrastructure & Urban Development Corporation ("KIND"), the Republic of Korea’s specialized public institution mandated by the Ministry of Land, Infrastructure and Transport ("MOLIT"), and Hyundai Engineering Co. Ltd. ("Hyundai Engineering"), a leading Korean and international engineering, procurement and construction company, to advance the development of the Rhyolite Ridge Lithium-Boron Project ("Project" or "Rhyolite Ridge").
Since 2016, Ioneer has invested more than US$220 million in Rhyolite Ridge and completed more than 70% of its advanced engineering work. It hosts the only known lithium-boron reserve in North America, one of two globally, and is the only project of its kind in active development. Once operational, Rhyolite Ridge will process ore into final products entirely on-site and create and support 275 to 300 permanent positions in rural Nevada.
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com
Ioneer Signs MOUs with KIND and
Hyundai Engineering to Advance
Rhyolite Ridge Lithium-Boron Project
8 July 2026 – SYDNEY, Australia – Ioneer Ltd ("Ioneer" or "Company") (ASX: INR, NASDAQ: IONR) announced the signing of non-binding Memorandums of Understanding (each a "MOU") with the Korea Overseas Infrastructure & Urban Development Corporation ("KIND"), the Republic of Korea’s specialized public institution mandated by the Ministry of Land, Infrastructure and Transport ("MOLIT"), and Hyundai Engineering Co. Ltd. ("Hyundai Engineering"), a leading Korean and international engineering, procurement and construction company, to advance the development of the Rhyolite Ridge Lithium- Boron Project ("Project" or "Rhyolite Ridge"). Since 2016, Ioneer has invested more than US$220 million in Rhyolite Ridge and completed more than 70% of its advanced engineering work. It hosts the only known lithium-boron reserve in North America, one of two globally, and is the only project of its kind in active development. Once operational, Rhyolite Ridge will process ore into final products entirely on-site and create and support 275 to 300 permanent positions in rural Nevada. Under the MOUs, KIND is considering making an equity investment in the Project, and Hyundai Engineering is considering the provision of certain procurement-related activities in connection with the Project. The MOUs reflect Rhyolite Ridge's strategic value for both the United States and the Republic of Korea, and its role as a cornerstone of America's efforts to secure a domestic supply of urgently needed critical minerals. "KIND and Hyundai Engineering bring proven expertise and a shared commitment to delivering critical minerals projects. Together, we are closer than ever to breaking ground at Rhyolite Ridge and bringing urgently needed lithium and boron to the market," said Bernard Rowe, Managing Director, Ioneer. "We look forward to what we will accomplish together." "KIND is pleased to deepen the strategic and economic partnership between the Republic of Korea and the United States through this MOU," said Chris Soeung Kim, Director of plant business division, KIND. "We have been actively advancing investments in U.S. energy, infrastructure and critical minerals, and Rhyolite Ridge is exactly the kind of investment that serves our mandate." "Across the metrics that matter most – permitting, construction readiness, and long-term supply certainty – Rhyolite Ridge stands apart from other critical mineral projects," said Seung Dong Lee, Head of process plant business execution office, Hyundai Engineering. "This MOU to participate in the engineering, procurement and design reflects our intent to pursue shared interests, securing a reliable critical minerals supply chain for the industries we serve and our confidence in Ioneer’s leadership."
"These MOUs reflect the strength and maturity of Rhyolite Ridge. With the entry into MOUs with KIND and Hyundai Engineering, we are one step closer to a Final Investment Decision and to delivering this once-in-a-generation asset for U.S. critical minerals production," said James Calaway, Executive Chairman, Ioneer.
The MOUs are non-binding and do not create legally enforceable obligations on the part of KIND and Hyundai Engineering to invest in or otherwise support the development of Rhyolite Ridge. There can be no certainty that legally binding arrangements will be entered into.
Pictured at the July 7 signing ceremony, left to right (first row): Kim, Bokhwan, CEO & president, KIND; James Calaway, Executive Chairman, Ioneer; Lee, Seung Dong, VP, Head of Process Plant Business Execution Office, Hyundai Engineering. Left to right (second row): Kyle Haustveit, Undersecretary of Energy, U.S. Department of Energy; Kim, Yi-tak, Vice Minister, MOLIT.
—ENDS—
About Ioneer Ioneer Ltd. is an emerging lithium–boron producer and the 100% owner of the Rhyolite Ridge Lithium- Boron Project. Rhyolite Ridge is one of only a small number of lithium-boron ore deposits globally and a linchpin project in Nevada’s burgeoning Lithium Loop.
Rhyolite Ridge closed a US$996 million loan with the DOE's Office of Energy Dominance Financing in January 2025. In October 2024, Ioneer received the final federal permit for the Project from the Bureau of Land Management, concluding the formal federal permitting process which began in early 2020. Ioneer signed separate offtake agreements with Ford Motor Company and Prime Planet Energy & Solutions (joint venture between Toyota and Panasonic) in 2022 and Korea’s EcoPro Innovation in 2021. To learn more about Ioneer, visit www.Ioneer.com/investors or join our online communities on X, Facebook, LinkedIn, Instagram and YouTube.
About KIND The Korea Overseas Infrastructure & Urban Development Corporation is a specialized public institution established under the Ministry of Land, Infrastructure and Transport of the Republic of Korea. KIND is mandated to support Korean companies in advancing overseas infrastructure and public-private partnership ("PPP") projects by providing equity investment, structured financing, and project development support.
KIND operates across a broad range of sectors including transportation, energy, urban development, and critical minerals, in partnership with multilateral development banks, commercial banks, governments, and private developers. As a dedicated PPP investment institution, KIND plays a central role in expanding Korea's overseas infrastructure footprint while advancing bilateral economic cooperation with partner nations.
Appendix 2A - Application for quotation of securities 1 / 7 Announcement Summary Entity name IONEER LTD Announcement Type New announcement Date of this announcement Friday July 03, 2026 The +securities to be quoted are: Total number of +securities to be quoted ASX +security codeSecurity description Number of +securities to be quotedIssue date INRORDINARY FULLY PAID13,010,39101/07/2026 Refer to next page for full details of the announcement +Securities issued under an +employee incentive scheme that are not subject to a restriction on transfer or that are to be quoted notwithstanding there is a restriction on transfer
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 2 / 7 Part 1 - Entity and announcement details 1.1 Name of entity IONEER LTD We (the entity named above) apply for +quotation of the following +securities and agree to the matters set out in Appendix 2A of the ASX Listing Rules. 1.2 Registered number type ACN Registration number 098564606 1.3 ASX issuer code INR 1.4 The announcement is 1.5 Date of this announcement 3/7/2026 New announcement
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 3 / 7 Part 2 - Type of Issue 2.1 The +securities to be quoted are: 2.2 The +class of +securities to be quoted is: Additional +securities in a class that is already quoted on ASX ("existing class") +Securities issued under an +employee incentive scheme that are not subject to a restriction on transfer or that are to be quoted notwithstanding there is a restriction on transfer
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 4 / 7 Part 3B - number and type of +securities to be quoted (existing class) where issue has not previously been notified to ASX in an Appendix 3B Additional +securities to be quoted in an existing class issued under an +employee incentive scheme FROM (Existing Class) ASX +security code and description INRAS : PERFORMANCE RIGHTS TO (Existing Class) ASX +security code and description INR : ORDINARY FULLY PAID Please state the number of +securities issued under the +employee incentive scheme that are not subject to a restriction on transfer or that are to be quoted notwithstanding there is a restriction on transfer 13,010,391 Please provide details of a URL link for a document lodged with ASX detailing the terms of the +employee incentive scheme or a summary of the terms https://www.marketindex.com.au/asx/inr/announcements/notice-of-annual-general-meetingproxy-form-2A1477270 https://www.marketindex.com.au/asx/inr/announcements/notice-of-annual-general-meetingproxy-form-2A1552369 Are any of these +securities being issued to +key management personnel (KMP) or an +associate Provide details of the KMP or +associates being issued +securities Name of KMPName of registered holderNumber of +securities James D. CalawayJames D. Calaway 1,996,093 Bernard Anthony RoweBernard Anthony Rowe 2,492,686 Matt WeaverMatt Weaver 872,553 Chad YeftichChad Yeftich 1,481,889 Yoshio NagaiYoshio Nagai 956,338 Ken CoonKen Coon 336,568 Issue date 1/7/2026 Will the +securities to be quoted rank equally in all respects from their issue date with the existing issued +securities in that class? Yes Yes
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 5 / 7 Issue details Number of +securities to be quoted 13,010,391 Are the +securities being issued for a cash consideration? Please describe the consideration being provided for the +securities Nil - Vesting of employee performance rights Please provide an estimate (in AUD) of the value of the consideration being provided per +security for the +securities to be quoted 0.000000 Any other information the entity wishes to provide about the +securities to be quoted No No
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 6 / 7 Part 4 - Issued capital following quotation Following the quotation of the +securities the subject of this application, the issued capital of the entity will comprise: The figures in parts 4.1 and 4.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing. 4.1 Quoted +securities (total number of each +class of +securities quoted on ASX following the +quotation of the +securities subject of this application) ASX +security code and description Total number of +securities on issue INR : ORDINARY FULLY PAID3,087,644,348 4.2 Unquoted +securities (total number of each +class of +securities issued but not quoted on ASX) ASX +security code and description Total number of +securities on issue INRAS : PERFORMANCE RIGHTS64,322,112
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 7 / 7 Part 5 - Other Listing Rule requirements 5.1 Are the +securities being issued under an exception in Listing Rule 7.2 and therefore the issue does not need any security holder approval under Listing Rule 7.1? 5.1a Select the number of the applicable exception in Listing Rule 7.2 13 Yes
Appendix 3H - Notification of cessation of securities 1 / 4 Announcement Summary Entity name IONEER LTD Announcement Type New announcement Date of this announcement Friday July 03, 2026 Details of +securities that have ceased ASX +security codeSecurity description Number of +securities that have ceased The +securities have ceased due to Date of cessation INRASPERFORMANCE RIGHTS2,094,695Lapse of conditional right to securities because the conditions have not been, or have become incapable of being, satisfied 01/07/2026 Refer to next page for full details of the announcement
Appendix 3H - Notification of cessation of securities Appendix 3H - Notification of cessation of securities 2 / 4 Part 1 - Announcement Details 1.1 Name of +Entity IONEER LTD We (the entity named above) provide the following information about our issued capital. 1.2 Registered Number Type ACN Registration Number 098564606 1.3 ASX issuer code INR 1.4 The announcement is 1.5 Date of this announcement 3/7/2026 New announcement
Appendix 3H - Notification of cessation of securities Appendix 3H - Notification of cessation of securities 3 / 4 Part 2 - Details of +equity securities or +debt securities that have ceased ASX +Security Code and Description INRAS : PERFORMANCE RIGHTS Unquoted +equity securities that have ceased Number of securities that have ceased 2,094,695 Reason for cessation Lapse of conditional right to securities because the conditions have not been, or have become incapable of being, satisfied Date of cessation 1/7/2026 Is the entity paying any consideration for the cessation? Any other information the entity wishes to notify to ASX about the cessation? No No
Appendix 3H - Notification of cessation of securities Appendix 3H - Notification of cessation of securities 4 / 4 Part 3 - Issued capital following changes Following the cessation of the +securities the subject of this notification, the issued capital of the entity will comprise: The figures in parts 3.1 and 3.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing. 3.1 Quoted +equity securities and +debt securities (total number of each +class of +securities quoted on ASX) ASX +security code and description Total number of +securities on issue INR : ORDINARY FULLY PAID3,074,633,957 3.2 Unquoted +equity securities (total number of each +class of +equity securities issued but not quoted on ASX) ASX +security code and description Total number of +securities on issue INRAS : PERFORMANCE RIGHTS75,237,808 Note: the figures stated in the tables above are used to calculate the total market capitalisation of the entity published by ASX from time to time. The table will not include those classes of +securities that have ceased or lapsed in their entirety in ASX records before the announcement date described in Q1.5, even if the entity has advised ASX of a change to that class of +security in Part 2 of this form.
30 June 2026
ioneer Limited Contents 30 June 2026
2 Directors' report 3 Auditor's independence declaration 7 Statement of profit or loss and other comprehensive income 8 Statement of financial position 9 Statement of changes in equity 10 Statement of cash flows 11 Notes to the financial statements 12 Directors' declaration 21 Independent auditor's report to the members of ioneer Limited 22
ioneer Limited Directors' report 30 June 2026
3
The directors present their report, together with the interim consolidated financial statements of Ioneer Ltd ('Ioneer' or the
'Company' and its subsidiaries (collectively the 'Group') for the six months ended 30 June 2026 and the Auditor's Report
thereon.
This financial report is presented for the six-month period from 1 January 2026 to 30 June 2026, with the comparative period being the six-month period from 1 July 2025 to 31 December 2025. The Group changed its financial year end from 30 June to 31 December to better align the accounting reporting period with its subsidiaries in the United States of America, where the bulk of the Group’s business operations are located.
Directors The following persons were directors of the Company during the whole of the financial period and up to the date of this report, unless otherwise stated:
Mr. J.D. Calaway Executive Chairman Mr. B. Rowe Managing Director Mr. A. Davies Non-executive Director Ms. R. McKinney-James Non-executive Director Ms. M. Walker Non-executive Director Mr. T. Woodall Non-executive Director
Principal activities
The principal activity of the Group continues to be the development of the Rhyolite Ridge Lithium-Boron Project ("Rhyolite
Ridge" or the "Project") in Nevada, United States of America.
Operating and financial review The loss for the Group after providing for income tax for the six-month period ended 30 June 2026 amounted to $4,007,000 (six-month period ended 31 December 2025: loss of $4,070,000).
The operating and financial review forms part of the Directors' Report and has been prepared in accordance with section 299A
of the Corporations Act 2001 (Cth). The information provided aims to assist users to better understand the operations and
financial position of the Group. To assist users, financial information included in this review contains non-IFRS financial
information.
Summary of financial performance and position
6 months ended 30 Jun 2026 6 months ended 31 Dec 2025
Change
Change $'000 $'000 $'000 %
Operating cash flows (3,687) (3,069) (618) 20%
Investing cash flows (4,075) (6,329) 2,254 (36%)
Financing cash flows 47,965 1,982 45,983 2,320%
Total change in cash in the financial period 40,203 (7,416) 47,619
6 months ended 30 Jun 2026 6 months ended 31 Dec 2025
Change
Change $'000 $'000 $'000 %
Cash and cash equivalents 58,840 17,863 40,977 229%
Capitalised exploration 5,728 5,850 (122) (2%)
Net assets 276,687 230,219 46,468 20%
Net loss after tax (4,007) (4,070) 63 2%
ioneer Limited Directors' report 30 June 2026
4 30 Jun 2026 31 Dec 2025 Summary of mineral resources and ore reserves (1) mt mt
Mineral Resource:
Measured 158 158
Indicated 282 282
Inferred 108 108
Total Mineral Resource 548 548
Proved 92 92 Probable 174 174
Total Ore Reserve 266 266
(1) Further detail on Mineral Resources and Ore Reserves can be found in the Group’s annual report for the six months ended 31 December 2025.
Highlights for the six months ended 30 June 2026
Corporate
● Ioneer completed an equity raise for approximately US$50 million (A$72 million) with participation from new and existing shareholders, including high quality offshore and domestic institutions. ● The Company signed non-binding Memorandums of Understanding to advance the development of Rhyolite Ridge. ● Ioneer received a conditional award from the United States Army for a long-term land lease on the Tooele Army Depot for the purpose of establishing a critical mineral processing facility. ● The Company continued to maintain compliance with terms of its closed loan facility with the U.S. Department of Energy. ● The Company filed a Form F-3 shelf prospectus with the Security and Exchange Commission which gives Ioneer the ability to issue debt and equity securities in the United Statement in the future. ● Ioneer continued ongoing engagement with the U.S. Government and potential strategic partners.
Environmental
● The U.S. District Court for the District of Nevada upheld the federal permit for Rhyolite Ridge.
● Ioneer completed the first phase of the multi-year Tiehm's buckwheat introduction program by transplanting 35 plants
from its greenhouse to an approved introduction site after receiving all necessary approvals from the Bureau of Land
Management ("BLM") and U.S. Fish and Wildlife Service (“USFWS”).
● Ioneer continued to maintain compliance with the issued U.S. Department of Interior Bureau of Land Management’s
Record of Decision, State of Nevada Water Pollution Control and Class II Air Permits.
Engineering
● Ioneer completed a pre-feasibility study for a battery-grade lithium carbonate circuit which has confirmed feasibility to
produce battery-grade lithium carbonate at Rhyolite Ridge.
● The Company commissioned a pre-feasibility study to evaluate the feasibility of building a plant to produce defense -
grade boron carbide from boron produced at Rhyolite Ridge.
● Ioneer issued the Technical Report under Subpart 1300 of the U.S. Securities and Exchange Regulations S-K,
incorporating the materially improved project economics due to reduction in leach duration.
● EcoPro completed its Lithium Clay Research & Development project - a final project report has been prepared, which
includes a process flow sheet developed with commercially feasible operating costs.
Dividends There were no dividends paid, recommended or declared during the current or previous financial period.
Environmental regulation The Group holds exploration licences issued by the relevant government authorities which specify guidelines for environmental impacts in relation to exploration activities. The licence conditions provide for the full rehabilitation of the areas of exploration in accordance with regulatory guidelines and standards. There have been no known breaches of the licence conditions.
ioneer Limited Directors' report 30 June 2026
5
In October 2024, the BLM issued a favourable Record of Decision (“ROD”), authorizing the Project’s Plan of Operations and
completing the National Environmental Policy Act (“NEPA”) process. As part of the Final EIS, the USFWS also formally
released the Endangered Species Act (“ESA”) Section 7 Biological Opinion, concluding ioneer’s Rhyolite Ridge Lithium-Boron
Project will not jeopardize the ESA-listed Tiehm’s buckwheat or adversely modify its critical habitat. The issue of the ROD
concludes the formal federal permitting process, which began in early 2020.
Soon after the issue of the ROD, three Non-Governmental Organisations - The Center for Biological Diversity, Great Basin Resource Watch and Western Shoshone Defense Project - (collectively, the “Plaintiffs”) filed a lawsuit in U.S. District Court for the District of Nevada (“U.S. District Court”) against the BLM decision. In November 2024, Ioneer filed a motion to intervene, which the court allowed in January 2025.
On 31 March 2026, the U.S. District Court issued its decision in the lawsuit, upholding the BLM decision to issue its favourable ROD. The Court found that the BLM and the USFWS complied with the ESA, Federal Land Policy and Management Act, and NEPA in their review and approval of the Project.
On 9 April 2026, the Plaintiffs filed a notice of appeal of the U.S. District Court’s decision to the United States Court of Appeals for the Ninth Circuit.
Ioneer is actively participating in the appeal of the U.S. District Court’s decision upholding BLM’s approval of the Project. The Plaintiffs have filed their initial brief. The Company remains confident in its legal position and expect to file its response brief in September 2026. The timing of the process is outside of the Company’s control; however, a decision is anticipated in mid- 2027. The appeal is not expected to delay commencement of construction.
We plan to issue a 2026 Sustainability Report in the first half of 2027.
Likely developments and expected results of operations Information on likely developments in the operations of the Company and the expected results of operations have not been included in this report because the directors believe it would be likely to result in unreasonable prejudice to the Company.
Significant changes in the state of affairs There were no significant changes in the state of affairs of the Company during the financial period.
Auditor Ernst & Young continues in office in accordance with section 327 of the Corporations Act 2001.
Audit and non-audit services The directors are satisfied that the provision of non-audit services is compatible with the general standard of independence for auditors imposed by the Corporations Act 2001.
Auditor's independence declaration
A copy of the auditor's independence declaration as required under section 307C of the Corporations Act 2001 is set out
immediately after this directors' report.
Matters subsequent to the end of the financial period
No matter or circumstance has arisen since 30 June 2026 that has significantly affected, or may significantly affect the
Company's operations, the results of those operations, or the Company's state of affairs in future financial years.
Rounding of amounts
The amounts contained in the Directors' Report have been rounded to the nearest $1,000 (where rounding is applicable)
where noted ($'000) under the option available to the Company as provided in ASIC Corporations (Rounding in
Financial/Directors' Report) Instrument 2016/191. The Company is an entity to which this legislative instrument applies.
ioneer Limited Directors' report 30 June 2026
6 This report is made in accordance with a resolution of directors, pursuant to section 298(2)(a) of the Corporations Act 2001.
On behalf of the directors
James D Calaway Executive Chairman
13 August 2026
A member firm of Ernst & Young Global Limited Liability limited by a scheme approved under Professional Standards Legislation Ernst & Young 200 George Street Sydney NSW 2000 Australia GPO Box 2646 Sydney NSW 2001 Tel: +61 2 9248 5555 Fax: +61 2 9248 5959 ey.com/au Auditor’s Independence Declaration to the directors of ioneer Ltd As lead auditor for the review of the half-year financial report of ioneer Ltd for the half-year ended 30 June 2026, I declare to the best of my knowledge and belief, there have been: a.No contraventions of the auditor independence requirements of the Corporations Act 2001 in relation to the review; b.No contraventions of any applicable code of professional conduct in relation to the review; and c.No non-audit services provided that contravene any applicable code of professional conduct in relation to the review. This declaration is in respect of ioneer Ltd and the entities it controlled during the financial period. Ernst & Young Siobhan Hughes Partner Sydney 13 August 2026 7
ioneer Limited Statement of profit or loss and other comprehensive income For the period ended 30 June 2026
Note 6 months ended 30-Jun-2026 6 months ended 31-Dec-2025 $'000 $'000
The above statement of profit or loss and other comprehensive income should be read in conjunction with the
accompanying notes
8
Revenue
Interest revenue calculated using the effective interest method 5 654 328
Expenses
Employee benefits expense 3 (2,287) (2,721)
Other expenses 4 (2,346) (1,645)
Finance costs 5 (28) (32)
Loss before income tax expense (4,007) (4,070)
Income tax expense - -
Loss after income tax expense for the period attributable to the owners of ioneer Limited
(4,007)
(4,070)
Other comprehensive income
Items that may be reclassified subsequently to profit or loss
Foreign currency translation 786 207
Other comprehensive income for the period, net of tax 786 207
Total comprehensive income for the period attributable to the owners of ioneer Limited
(3,221)
(3,863)
Cents Cents
Basic earnings per share (0.13) (0.17) Diluted earnings per share (0.13) (0.17)
ioneer Limited Statement of financial position As at 30 June 2026
Note 30-Jun-2026 31-Dec-2025 $'000 $'000
The above statement of financial position should be read in conjunction with the accompanying notes 9 Assets
Current assets
Cash and cash equivalents 6 58,840 17,863
Receivables 7 469 508
Total current assets 59,309 18,371
Non-current assets
Receivables 292 289
Property, plant and equipment 8 254 335
Right-of-use assets 230 266
Exploration and evaluation 9 214,737 209,009
Other 10 4,273 4,273
Total non-current assets 219,786 214,172
Total assets 279,095 232,543
Liabilities
Current liabilities
Payables 11 1,719 1,686
Provisions 12 392 303
Lease liabilities 191 151
Total current liabilities 2,302 2,140
Non-current liabilities
Lease liabilities 106 184
Total non-current liabilities 106 184
Total liabilities 2,408 2,324
Net assets 276,687 230,219
Equity
Issued capital 13 357,608 309,498
Reserves (2,938) (5,303)
Accumulated losses (77,983) (73,976)
Total equity 276,687 230,219
ioneer Limited Statement of changes in equity For the period ended 30 June 2026
The above statement of changes in equity should be read in conjunction with the accompanying notes 10
Total equity
Issued capital
Foreign currency translation reserve Equity compensation reserve
Accumulated losses
$'000 $'000 $'000 $'000 $'000
Balance at 1 July 2025 302,651 (13,030) 10,583 (69,906) 230,298
Loss after income tax expense for the period - - - (4,070) (4,070) Foreign currency translation differences - 207 - - 207
Total comprehensive income for the period - 207 - (4,070) (3,863)
Contributions of equity, net of transaction costs (Note 13) 2,176 - - - 2,176 Share issue costs from capital raise (Note 13) (99) - - - (99) Fair value of performance rights vested (Note 13) 4,770 - (4,770) - - Share-based payments expensed/capitalised - - 1,707 - 1,707
Balance at 31 December 2025 309,498 (12,823) 7,520 (73,976) 230,219
Total equity
Issued capital
Foreign currency translation reserve Equity compensation reserve
Accumulated losses
$'000 $'000 $'000 $'000 $'000
Balance at 1 January 2026 309,498 (12,823) 7,520 (73,976) 230,219
Loss after income tax expense for the period - - - (4,007) (4,007) Foreign currency translation differences - 786 - - 786
Total comprehensive income for the period - 786 - (4,007) (3,221)
Share issued from capital raise (Note 13) 50,400 - - - 50,400 Share issue costs from capital raise (Note 13) (2,290) - - - (2,290) Share-based payments expensed/capitalised - - 1,579 - 1,579
Balance at 30 June 2026 357,608 (12,037) 9,099 (77,983) 276,687
ioneer Limited Statement of cash flows For the period ended 30 June 2026
Note 6 months ended 30-Jun-2026 6 months ended 31-Dec-2025 $'000 $'000
The above statement of cash flows should be read in conjunction with the accompanying notes
11
Cash flows from operating activities
Payments to suppliers and employees (3,687) (3,069)
Net cash used in operating activities (3,687) (3,069)
Cash flows from investing activities
Payments for plant and equipment 8 - (9)
Expenditure on exploration and evaluation (4,571) (6,629)
Interest received 496 309
Net cash used in investing activities (4,075) (6,329)
Cash flows from financing activities
Proceeds from issue of shares 13 50,400 2,176
Transaction costs related to issues of equity securities 13 (2,290) (99)
Repayment of lease liabilities (145) (95)
Net cash from financing activities 47,965 1,982
Net increase/(decrease) in cash and cash equivalents 40,203 (7,416)
Cash and cash equivalents at the beginning of the period 17,863 25,059
Effects of exchange rate changes on cash and cash equivalents 774 220
Cash and cash equivalents at the end of the period 6 58,840 17,863
ioneer Limited Notes to the financial statements 30 June 2026
12 Note 1. Basis of preparation and Material accounting policies
1.1 Corporate information
The interim consolidated financial statements of Ioneer Ltd (the Company or parent) and its subsidiaries (collectively, the
Group) for six months ended 30 June 2026 were authorised for issue in accordance with a resolution of the Directors on 13
August 2026.
The Group is a for-profit company limited by shares and incorporated in Australia whose shares are publicly traded on the
Australian Securities Exchange under the ticker code "INR" and on Nasdaq under the ticker code "IONR". The registered
office of the Company is suite 16.01, 213 Miller Street, North Sydney, NSW 2060 Australia.
The Group is principally engaged in the development of the Rhyolite Ridge lithium-boron deposit in the state of Nevada, United States of America. Further information about the nature of the Group's operations and activities is provided in the Directors' Report.
1.2 Basis of preparation
These general purpose financial statements for the interim half-year reporting period ended 30 June 2026 have been prepared
in accordance with Australian Accounting Standard AASB 134 'Interim Financial Reporting' and the Corporations Act 2001,
as appropriate for for-profit oriented entities. Compliance with AASB 134 ensures compliance with International Financial
Reporting Standard IAS 34 'Interim Financial Reporting'.
The interim consolidated financial statements have been prepared on a historical cost basis. The interim consolidated financial
statements are presented in USD, and all values are rounded to the nearest thousand (‘$000), except where otherwise
indicated.
The Group has prepared the interim financial statements on the basis that it will continue to operate as a going concern. The Directors consider that there are no material uncertainties that may cast significant doubt over this assumption. They have formed a judgement that there is reasonable expectation that the Group has adequate resources to continue in operational existence for the foreseeable future, and not less than 12 months from the end of the reporting period.
These general purpose financial statements do not include all the notes of the type normally included in annual financial
statements. Accordingly, these financial statements are to be read in conjunction with the financial report for the transition
period ended 31 December 2025 and any public announcements made by the Company during the interim reporting period
in accordance with the continuous disclosure requirements of the Corporations Act 2001.
The accounting policies adopted are consistent with those of the previous financial period and corresponding interim reporting period, unless otherwise stated.
1.3 Change in fiscal year
This financial report is presented for the six-month period from 1 January 2026 to 30 June 2026 with the comparative reporting
period being the six-month transition period ended 31 December 2025. On 25 September 2025, the Board of Directors
approved a change in the Company’s financial year end from 30 June to 31 December to better align the accounting reporting
period with its subsidiaries in the United States of America, where the bulk of the group’s business operations are located.
1.4 New or amended Accounting Standards and Interpretations
The Group has adopted all of the new or amended Accounting Standards and Interpretations issued by the Australian
Accounting Standards Board ('AASB') that are mandatory for the current reporting period.
Any new or amended Accounting Standards or Interpretations that are not yet mandatory have not been early adopted.
The adoption of these Accounting Standards and Interpretations did not have any significant impact on the financial
performance or position of the Group.
The accounting policies adopted in the preparation of the interim condensed consolidated financial statements are consistent with those followed in the preparation of the Group’s consolidated financial statements for the six-months ended 31 December 2025.
ioneer Limited Notes to the financial statements 30 June 2026
13 Note 2. Operating segments
2.1 Operating Segments
An operating segment is a component of the Group that engages in business activities from which it may earn revenues and
incur expenses; including revenues and expenses that relate to transactions with any of the Group's other components. An
operating segment's operating results are reviewed regularly by the Chief Operating Decision Maker (CODM) to make
decisions about resources to be allocated to the segment and assess its performance, and for which discrete financial
information is available. The Managing Director is considered to be the CODM and is empowered by the Board to allocate
resources and assess the performance of the Group.
Segment results that are reported to the CODM include items directly attributable to a segment as well as those that can be allocated on a reasonable basis.
Description of segments
The Company operates predominantly as a mineral exploration and development company. The operating segments are
based on the reports reviewed by the Managing Director for assessing performance and determining the allocation of
resources and strategic decision making within the Group.
North America Represents activity in the US primarily in relation to Rhyolite Ridge and the Reno office. Australia Represents head office expenditure, including ASX listing costs, employee benefits, exchange gains and losses and corporate assets (predominantly cash).
North America North America
Australia
Australia
Total
Total
6 months
ended
30-Jun-2026
($'000) 6 months ended 31-Dec-2025
($'000)
6 months
ended
30-Jun-2026
($'000)
6 months
ended
31-Dec-2025
($'000) 6 months ended 30-Jun-2026
($'000) 6 months ended 31-Dec-2025 ($'000)
Other expenses (930) (741) (1,416) (904) (2,346) (1,645)
Employee benefits and other expenses
(1,150)
(964)
(1,137)
(1,757)
(2,287)
(2,721) Net financing (expense)/income (2,200) (1,996) 2,825 2,292 626 296
Loss before income tax (4,280) (3,701) 272 (369) (4,007) (4,070)
Segment assets
Exploration assets 214,737 209,009 - - 214,737 209,009
Other assets 53,507 12,683 10,851 10,851 64,358 23,534
Total assets 268,244 221,692 10,851 10,851 279,095 232,543
Segment liabilities
Payables (1,761) (1,416) (148) (421) (1,909) (1,837)
Provisions (169) (105) (224) (198) (393) (303)
Total current liabilities (1,930) (1,521) (372) (619) (2,302) (2,140)
Payables (20) (107) (86) (77) (106) (184) Total non-current liabilities (20) (107) (86) (77) (106) (184)
Net assets 266,294 220,064 10,393 10,155 276,687 230,219
Major customers This Company has no major customers and nil revenues at 30 June 2026 (31 December 2025: nil).
ioneer Limited Notes to the financial statements 30 June 2026
14 Note 3. Employee benefits expensed
6 months ended 30-Jun-2026 6 months ended 31-Dec-2025 $'000 $'000
Non-executive director fees 195 205
Executive director fees 125 125
Employee benefits expense 1,121 1,289
Share-based payments 846 1,102
Total employee benefits expensed 2,287 2,721
Note 4. Expenses
6 months ended 30-Jun-2026 6 months ended 31-Dec-2025 $'000 $'000
Other expenses
General and administration expenses 984 822
Consulting and professional costs 1,166 646
Depreciation and amortisation 196 177
Total other expenses 2,346 1,645
Note 5. Net finance income
6 months ended 30-Jun-2026 6 months ended 31-Dec-2025 $'000 $'000
Interest income from external parties 653 309
Net foreign exchange gain 1 19
Finance income 654 328
Bank charges (21) (24) Lease interest (7) (8) Finance costs (28) (32)
Net finance income 626 296
Note 6. Current assets - cash and cash equivalents
30-Jun-2026 31-Dec-2025 $'000 $'000
Cash at bank 11,074 10,843
Cash on deposit 47,766 7,020
58,840 17,863
Cash and short-term deposits in the statement of financial position comprise cash at bank and on hand and short term highly liquid deposits with a maturity of three months or less, that are readily convertible to a known amount of cash and subject to an insignificant risk of changes in value.
ioneer Limited Notes to the financial statements 30 June 2026
15 Note 7. Current assets - receivables
30-Jun-2026 31-Dec-2025 $'000 $'000
Other debtors 359 160
Prepayments 110 348
Total current receivables 469 508
Receivables are recognised initially at fair value and subsequently measured at amortised cost using the effective interest
rate method less provision for impairment. Impairment losses, if any, are recognised in the profit and loss.
Note 8. Non-current assets - property, plant and equipment
30-Jun-2026 31-Dec-2025 $'000 $'000
Leasehold improvements - at cost 88 88
Less: Accumulated depreciation (23) (3)
65 85
Plant and equipment - at cost 626 626
Less: Accumulated depreciation (437) (376)
189 250
254 335
Reconciliations Reconciliations of the written down values at the beginning and end of the current period-end and previous financial year are set out below:
Leasehold improvements Plant and equipment
Total $'000 $'000 $'000
Balance at 1 July 2025 - 289 289 Additions - 20 20 Transfers in/(out) 88 - 88 Depreciation expense (3) (59) (62)
Balance at 31 December 2025 85 250 335 Depreciation expense (20) (61) (81)
Balance at 30 June 2026 65 189 254
Plant and equipment assets are stated at cost less accumulated depreciation and any impairment in value. Depreciation is calculated on a straight-line basis over the useful life of the asset being between 1-4 years.
An item of plant and equipment is derecognised upon disposal. Any gain or loss arising on derecognition of the asset
(calculated as the difference between the net disposal proceeds and the carrying amount of the item) is included in the
statement of profit and loss in the period the item is derecognised.
The residual values, useful lives and methods of depreciation of property, plant and equipment are reviewed at each financial
year end adjusted prospectively, if appropriate. At each reporting date, the Group assesses whether there is any indication
that an asset may be impaired. Where an indicator of impairment exists, the Group makes a formal estimate of the recoverable
amount. Where the carrying amount of an asset exceeds its recoverable amount, the asset is considered impaired and is
written down to its recoverable amount. Recoverable amount is the greater of fair value less costs to sell and value in use.
ioneer Limited Notes to the financial statements 30 June 2026
16 Note 9. Non-current assets - exploration and evaluation
Exploration and evaluation expenditure incurred by or on behalf of the Group is accumulated separately for each area of
interest. Such expenditure comprises net direct costs and an appropriate portion of related overhead expenditure but does
not include general overheads or administrative expenditure not having a specific connection with a particular area of interest.
Exploration and evaluation costs in relation to separate areas of interest for which rights of tenure are current are brought to account in the year in which they are incurred and carried forward provided that:
● such costs are expected to be recouped through successful development and exploitation of the area, or alternatively through its sale; or ● exploration and/or evaluation activities in the area have not yet reached a stage which permits a reasonable assessment of the existence or otherwise of economically recoverable reserves.
The types of costs recognised as exploration and evaluation assets include costs to acquire the legal rights to explore in the specific area and costs incurred in respect of the search for mineral resources, determination of technical feasibility and the assessment of commercial viability of an identified resource, in accordance with AASB 6.
A Final Investment Decision (FID) to develop the Project is expected to be made after considering the following key factors: required permits are in place, engineering has reached construction ready status, adequate offtake agreements have been signed to underwrite any debt requirements, and the Project is funded through a mix of equity and debt. In order for FID and to attract funding, the Project will need to demonstrate technical feasibility and commercial viability.
Once FID has been taken, all past and future exploration and evaluation assets in respect of the area of interest are tested for impairment and transferred to the costs of development. To date, no development decision has been made.
The Directors assess at each reporting date whether there is an indication that an asset has been impaired and for exploration
and evaluation costs carried forward whether the above carry forward criteria are met. No indicators of impairment were
identified when annual testing was performed as at 31 December 2025.
When the above criteria do not apply or when the Directors assess that the carrying value may exceed the recoverable amount, the accumulated costs in respect of areas of interest are written off in the Statement of profit and loss and other comprehensive income.
30-Jun-2026 31-Dec-2025 $'000 $'000
Exploration assets 214,737 209,009
Reconciliations Reconciliations of the written down values at the beginning and end of the current and previous financial period are set out below:
Exploration assets $'000
Balance at 1 July 2025 203,110 Additions - Rhyolite Rydge 5,850 Exploration expenditure - noncore 49
Balance at 31 December 2025 209,009 Additions - Rhyolite Rydge 5,728
Balance at 30 June 2026 214,737
ioneer Limited Notes to the financial statements 30 June 2026
Note 9. Non-current assets - exploration and evaluation (continued)
17 The above amounts represent costs of areas of interest carried forward as an asset in accordance with the accounting policy described above. The ultimate recoupment of exploration and evaluation expenditure in respect of an area of interest carried forward is dependent upon the discovery of commercially viable reserves and the successful development and exploitation of the respective areas or alternatively sale of the underlying areas of interest for at least their carrying value. Amortisation, in respect of the relevant area of interest, is not charged until a mining operation has commenced.
Exploration and evaluation costs carried forward relate primarily to the Rhyolite Ridge Lithium-Boron Project in Nevada, USA.
Exploration and evaluation expenditure on all other tenements owned by the Company have been fully impaired where
applicable.
Note 10. Non-current assets - other
30-Jun-2026 31-Dec-2025 $'000 $'000
Unamortised loan fees 4,273 4,273
The Company paid fees to establish a loan with the US Department of Energy (DOE). The fees will be amortised over the life of the loan. Amortisation begins after the first draw on said loan. The total loan amount is US$996 million (US$968 million in principal and US$28 million in capitalised interest during construction). The loan term is 20 years, and the interest rate is fixed from the date of each advance for the term of the loan at the applicable long-dated U.S. Treasury rate.
Note 11. Current liabilities - payables
30-Jun-2026 31-Dec-2025 $'000 $'000
Trade payables 1,667 962
Accrued expenses 52 724
1,719 1,686
All financial liabilities are recognised initially at fair value net of directly attributable transaction costs.
After initial measurement, financial liabilities are subsequently measured at amortised cost. Current payables, other than lease liabilities, due to their short-term nature, are measured at amortised cost and are not discounted.
The current payables, other than lease liabilities, are unsecured and are non-interest bearing generally on 30-60 day terms. The carrying amounts approximate fair value.
Note 12. Current liabilities - provisions
30-Jun-2026 31-Dec-2025 $'000 $'000
Provisions for employee benefits 392 303
Provisions are made for the Group's liability for employee benefits arising from services rendered by employees to the end of the reporting period. Employee benefits that are expected to be settled within one year have been measured at the amounts expected to be paid when the liability is settled. Employees' benefits payable later than one year have been measured at the present value of the estimated future cash outflows to be made for those benefits. In determining the liability, consideration is given to employee wage increases and the probability that the employee may satisfy vesting requirements. Those cash flows are discounted using market yields on high quality corporate bonds with terms to maturity that match the expected timing of cash flows.
ioneer Limited Notes to the financial statements 30 June 2026
18 Note 13. Equity - issued capital
30-Jun-2026 31-Dec-2025 30-Jun-2026 31-Dec-2025 Shares Shares $'000 $'000
Ordinary shares - fully paid 3,074,633,957 2,674,633,957 357,608 309,498
Movements in ordinary share capital
Details Shares $'000
Balance as at 1 July 2025 2,608,172,516 302,651 Share issue from capital raise 33,550,000 2,176 Share issue costs from capital raise - (99) Performance rights vested 1 32,911,441 4,770
Balance at year ended 31 December 2025 2,674,633,957 309,498 Share issue from capital raise 400,000,000 50,400 Share issue costs from capital raise - (2,290)
Balance as at 30 June 2026 3,074,633,957 357,608
(1) Ordinary shares issued to employees upon vesting of performance rights
Ordinary shares are classified as equity. There are no restrictions on voting rights. On a show of hands every member present
or by proxy shall have one vote and upon a poll each share shall have one vote. Where a member holds shares, which are
not fully paid, the number of votes to which that member is entitled on a poll in respect of those part paid shares shall be
fraction of one vote which the amount paid up bears to the total issued price thereof. They have the right to receive dividends
as declared and, in the event of winding up of the Company, to participate in the proceeds from the sale of all surplus assets
in proportion to the number of and amounts paid up on shares held.
Incremental costs directly attributable to the issue of new shares, options or rights are shown in equity as a deduction from the proceeds.
Management controls the capital of the Group in order to maintain a sustainable debt to equity ratio, generate long-term shareholder value and that the Group can fund its operations and continue as a going concern.
The Group is not subject to any externally imposed capital requirements.
During the six months ended 30 June 2026, the Company issued 400,000,000 shares as a consequence of a capital raise, nil shares as a consequence of Performance Rights vesting under the Equity Incentive Plan, and nil shares as a result of options exercised.
During the six months ended 31 December 2025, the Company issued 33,550,000 shares as a consequence of a capital
raise, 32,911,441 shares as a consequence of Performance Rights vesting under the Equity Incentive Plan, and nil shares as
a result of options exercised.
Share schemes The Company has one share scheme in operation, being the Equity Incentive Plan.
Under these plans, ordinary shares have been granted to senior executives, directors and employees and a number of
consultants. The Equity Incentive Plan is capable of issuing both options and performance rights.
Note 14. Equity - dividends
There were no dividends paid, recommended or declared during the current or previous financial period.
ioneer Limited Notes to the financial statements 30 June 2026
19 Note 15. Financial risk management
Framework
The Group is involved in activities that expose it to a variety of financial risks, including:
(a) Credit risk
(b) Liquidity risk
(c) Capital management risk
(d) Market risk related to commodity pricing, interest rates and currency fluctuations.
The Board of Directors has overall responsibility for the establishment and oversight of the financial risk management
framework of the group. Management is responsible for monitoring the financial risks.
The objective of the financial risk management strategy is to minimise the impact of volatility in financial markets on the
financial performance, cash flows and shareholder returns. This requires the identification and analysis of relevant financial
risks and possible impact on the achievement of the Group's objectives.
The Group does not undertake any hedging activities.
Fair value measurement
The Group measures and recognises in the statement of financial position on a recurring basis certain assets and liabilities at
fair value in accordance with AASB 13 Fair value measurement. The fair value must be estimated for recognition and
measurement or for disclosure purposes in accordance with the following hierarchy:
Level 1: Quoted prices (unadjusted) in active markets for identical assets or liabilities;
Level 2: Inputs other than quoted prices included within level 1 that are observable for the asset or liability,
either directly (as prices) or indirectly (derived from prices); and
Level 3: Inputs for the assets or liabilities which are not based on observable market data (unobservable
inputs).
The carrying values of financial assets and liabilities of the Group approximate their value. During the 6 months ended 30
June 2026, there were no transfers between Level 1 and Level 2 fair value measurements, and no transfers into or out of
Level 3 fair value measurements. (six months ended 31 December 2025: Nil)
The fair value of performance based performance rights is determined by using the Monte Carlo model.
ioneer Limited Notes to the financial statements 30 June 2026
20 Note 16. Contingent assets and liabilities
Settlement of Rhyolite Ridge
The Company has entered an option agreement to purchase Rhyolite Ridge from Boundary Peak Minerals LLC on 3 June 2016. The Company has made 4 progress payments to Boundary Peak under the agreement. A final payment will fall due following Board making a 'decision to mine' the Rhyolite Ridge property. Once this decision is made, the Company is required under the terms of the contract to either:
● Pay Boundary Peak LLC US$3 million, or
● Issue shares (or a mix of both shares and cash) to Boundary Peak LLC, to the equivalent of US$3 million at a fixed
exchange rate of USD$0.75 =AUD$1.00.
As at the date of this report, the decision to mine has not yet been made by the Company.
There are no other known contingent liabilities as at 30 June 2026.
Note 17. Events after the reporting period
No matter or circumstance has arisen since 30 June 2026 that has significantly affected, or may significantly affect the
company's operations, the results of those operations, or the company's state of affairs in future financial years.
ioneer Limited Directors' declaration 30 June 2026
21 In the directors' opinion:
● the attached financial statements and notes comply with the Corporations Act 2001, the Accounting Standards, the
Corporations Regulations 2001 and other mandatory professional reporting requirements;
● the attached financial statements and notes give a true and fair view of the company's financial position as at 30 June 2026 and of its performance for the financial period ended on that date; and
● there are reasonable grounds to believe that the company will be able to pay its debts as and when they become due and payable.
The directors have been given the declarations required by section 295A of the Corporations Act 2001.
Signed in accordance with a resolution of directors made pursuant to section 295(5)(a) of the Corporations Act 2001.
On behalf of the directors
James D Calaway Executive Chairman
13 August 2026
A member firm of Ernst & Young Global Limited
Liability limited by a scheme approved under Professional Standards Legislation
22
Ernst & Young
200 George Street
Sydney NSW 2000 Australia
GPO Box 2646 Sydney NSW 2001
Tel: +61 2 9248 5555
Fax: +61 2 9248 5959
ey.com/au
Independent auditor’s review report to the members of ioneer Ltd
Conclusion
We have reviewed the accompanying half-year financial report of ioneer Ltd (the Company) and its
subsidiaries (collectively the Group), which comprises the condensed consolidated statement of
financial position as at 30 June 2026 the condensed consolidated statement of profit or loss and
other comprehensive income, condensed consolidated statement of changes in equity and condensed
statement of cash flows for the half-year ended on that date, explanatory notes and the directors’
declaration.
Based on our review, which is not an audit, we have not become aware of any matter that makes us
believe that the half-year financial report of the Group does not comply with the Corporations Act
2001, including:
a.Giving a true and fair view of the consolidated financial position of the Group as at 30 June 2026
and of its consolidated financial performance for the half-year ended on that date; and
b.Complying with Accounting Standard AASB 134 Interim Financial Reporting and the Corporations
Regulations 2001.
Basis for conclusion
We conducted our review in accordance with ASRE 2410 Review of a Financial Report Performed by
the Independent Auditor of the Entity (ASRE 2410). Our responsibilities are further described in the
Auditor’s responsibilities for the review of the half-year financial report section of our report. We are
independent of the Group in accordance with the auditor independence requirements of the
Corporations Act 2001 and the ethical requirements of the Accounting Professional and Ethical
Standards Board’s APES 110 Code of Ethics for Professional Accountants (including Independence
Standards) (the Code) that are relevant to our audit of the annual financial report in Australia. We
have also fulfilled our other ethical responsibilities in accordance with the Code.
Directors’ responsibilities for the half-year financial report
The directors of the Company are responsible for the preparation of the half-year financial report that
gives a true and fair view in accordance with Australian Accounting Standards and the Corporations
Act 2001 and for such internal control as the directors determine is necessary to enable the
preparation of the half-year financial report that gives a true and fair view and is free from material
misstatement, whether due to fraud or error.
Auditor’s responsibilities for the review of the half-year financial report
Our responsibility is to express a conclusion on the half-year financial report based on our review.
ASRE 2410 requires us to conclude whether we have become aware of any matter that makes us
believe that the half-year financial report is not in accordance with the Corporations Act 2001
including giving a true and fair view of the Group’s financial position as at 30 June 2026 and its
performance for the half-year ended on that date, and complying with Accounting Standard AASB 134
Interim Financial Reporting and the Corporations Regulations 2001.
A member firm of Ernst & Young Global Limited
Liability limited by a scheme approved under Professional Standards Legislation
23
A review of a half-year financial report consists of making enquiries, primarily of persons responsible
for financial and accounting matters, and applying analytical and other review procedures. A review is
substantially less in scope than an audit conducted in accordance with Australian Auditing Standards
and consequently does not enable us to obtain assurance that we would become aware of all
significant matters that might be identified in an audit. Accordingly, we do not express an audit
opinion.
Ernst & Young
Siobhan Hughes
Partner
Sydney
13 August 2026
Market Announcements Office SYDNEY NSW 2000
SUBJECT: U.S. Army announces conditional awards for domestic critical mineral processing facilities to secure defense supply chains 26 June 2026 – SYDNEY, Australia – Ioneer Ltd (“Ioneer”) (ASX: INR, NASDAQ IONR) is pleased to advise that it has received a conditional award from the United States Army for a long-term land lease on the Tooele Army Depot for the purpose of establishing a critical mineral processing facility. Ioneer is one of only four companies to be selected for the award and is proud to be partnering with the U.S. Army to help build a secure, domestic boron supply chain. Ioneer’s construction ready Rhyolite Ridge Lithium-Boron Project hosts the largest undeveloped boron Ore Reserve in the world outside of Türkiye and the only undeveloped boron Ore Reserve in North America. In November 2025, the U.S. Government added boron to its list of critical minerals.
June 25, 2026 (US Time). Authorised for lodgement by: Bernard Rowe Managing Director To learn more about Ioneer, visit www.Ioneer.com/investors or join our online communities on X, Facebook, LinkedIn, Instagram and YouTube. Investor and Media Relations Chad Yeftich, Ioneer USA Corporation Investor Relations [email protected] +1 775 993 8563 FGS Global [email protected]
1
FOR IMMEDIATE RELEASE June 25, 2026
U.S. Army announces conditional lease awards for domestic critical mineral processing facilities to secure defense supply chains
WASHINGTON — In a major step toward strengthening national defense and securing domestic supply chains, the U.S. Army announced today the conditional award of long-term leases to four companies to design, finance, build, and operate critical mineral processing facilities on Army installations.
Leveraging underutilized land at Anniston Army Depot, Ala.; Pine Bluff Arsenal, Ark.; Red River Army Depot, Texas; and Tooele Army Depot, Utah, the Army is engaging with industry leaders to establish domestic processing capacity for minerals foundational to the warfighting capability of the Joint Force.
- Anniston Army Depot and Pine Bluff Arsenal: Empire State Mines, LLC, a wholly owned subsidiary of Titan Mining Corporation. (Graphite)
- Red River Army Depot: Energy X (Lithium)
- Tooele Army Depot: Ioneer USA Corporation (Boron)
- Tooele Army Depot: REalloys (Dysprosium & Terbium)
“The ability to process critical minerals on U.S. soil is a national-defense priority required for munitions, missiles, sensors, batteries, and the platforms our Soldiers depend on,” said Dr. Jeff Waksman, Principal Deputy Assistant Secretary of the Army for Installations, Energy and Environment. “Leveraging our legal authorities and land, the U.S. Army is able to help nurture a critical minerals industrial base which equips and sustains America’s Soldiers without putting any taxpayer dollars at risk.”
The announcement is enacted by the Army’s Strategic Capital Initiatives (SCI), a landmark effort to partner with the private sector to accelerate enterprise-wide modernization. These awards are the first time the Army / Dept. of War has sited commercial mineral processing facilities on American military installations, a direct execution of President Trump’s Executive Order 14241.
Formal lease agreements with these companies are in negotiation. Development is slated to begin as early as 2027, with an Initial Operating Capability targeted by, or ahead, of 2028.
A Proven Model and Value Returned to the Army These conditional awards are made possible through an Enhanced Use Lease (EUL), a statutory authority under 10 U.S.C. § 2667. An EUL is a real estate agreement that allows the Army to lease non-excess, underutilized land to private-sector partners.
Importantly, an EUL is a leasehold agreement, not a land sale; the United States retains title to the leased property at all times. Under this structure, the Army acts
2
purely as a landlord. The private party lessees bear all costs to finance, design, build, operate, secure, and decommission the facility.
In return for the use of the land, the lessee pays rent at or above fair market value. The Army prefers to receive this rent as "in-kind" consideration. This means that instead of cash, the lessee directly funds and executes infrastructure improvements on the host installation. This directly benefits Soldiers, families, and operations by upgrading utilities, enhancing infrastructure, and modernizing mission capabilities. Finally, a mandatory decommissioning bond ensures that funds are secured well in advance to return the land to its original condition when the lease ends.
A Trusted, American Partnership To mitigate supply chain risks and prevent undue foreign influence, eligibility for these projects was strictly limited to entities organized under U.S. law, featuring majority domestic ownership and control, and maintaining a U.S. place of business. Furthermore, any in-kind infrastructure improvements delivered to the Army will adhere to Davis-Bacon prevailing wages and Buy American Act requirements.
Environmental & Mission Compatibility First The Army remains committed to smart stewardship of its real property and the surrounding communities. Offerors are required to engage state and local authorities, assess local impact, and propose comprehensive mitigation strategies.
No construction will begin until rigorous environmental and regulatory reviews— including the National Environmental Policy Act (NEPA), Clean Air and Water Acts, and all required federal, state, and local permits—are fully complete. The selected parcels were specifically chosen to ensure compatibility with the ongoing missions of each host installation.
The conditional lease awards announced today follow recent successful applications of the Army's EUL model, including a conditional lease award with Hanwha Defense USA who is self-investing $1.3 billion into a munitions facility at Pine Bluff Arsenal, and the conditional lease awards for data-center facilities with Carlyle at Fort Bliss and CyrusOne at Dugway Proving Ground.
Rhyolite Ridge Lithium-Boron Project
• The Korea Overseas Infrastructure & Urban Development Corporation (KIND) and Asia’s leading engineering firm have signed non-binding letters of intent to commit to Rhyolite Ridge, advancing the path to a Final Investment Decision.
23 June 2026 – SYDNEY, Australia — Ioneer Ltd (“Ioneer” or “Company”) (ASX: INR, NASDAQ: IONR) announced the entry into strategic non-binding letters of intent (“LOI”) with the Korea Overseas Infrastructure & Urban Development Corporation (“KIND”), the Republic of Korea’s specialized public institution mandated by the Ministry of Land, Infrastructure and Transport (“MOLIT”) to facilitate and invest in overseas infrastructure and public-private partnership projects, and Hyundai Engineering Co. Ltd. (“Hyundai Engineering”), a leading Korean and international engineering, procurement and construction company, to advance the development of the Rhyolite Ridge Lithium-Boron Project (“Project” or “Rhyolite Ridge”).
The Project holds significant strategic value for both the Republic of Korea and the United States.
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com
Ioneer Secures Strategic Letters of Intent with KIND and Hyundai Engineering to Advance Rhyolite Ridge Lithium-Boron Project • The Korea Overseas Infrastructure & Urban Development Corporation (KIND) and Asia's leading engineering firm have signed non-binding letters of intent to commit to Rhyolite Ridge, advancing the path to a Final Investment Decision. 23 June 2026 – SYDNEY, Australia — Ioneer Ltd ("Ioneer" or "Company") (ASX: INR, NASDAQ: IONR) announced the entry into strategic non-binding letters of intent (“LOI”) with the Korea Overseas Infrastructure & Urban Development Corporation ("KIND"), the Republic of Korea’s specialized public institution mandated by the Ministry of Land, Infrastructure and Transport ("MOLIT") to facilitate and invest in overseas infrastructure and public-private partnership projects, and Hyundai Engineering Co. Ltd. ("Hyundai Engineering"), a leading Korean and international engineering, procurement and construction company, to advance the development of the Rhyolite Ridge Lithium-Boron Project ("Project" or "Rhyolite Ridge"). The Project holds significant strategic value for both the Republic of Korea and the United States. Rhyolite Ridge hosts the only known lithium-boron reserve in North America, one of two globally, and the only project of its kind in active development. The parties intend to formalize their cooperation through the execution of Memorandums of Understanding expected in July 2026. Since 2016, Ioneer has invested more than $220 million in Rhyolite Ridge and has completed more than 70% of its advanced engineering work. Ioneer is targeting a Final Investment Decision for the second half of 2026, with first commercial production expected in 2029. Once operational, Rhyolite Ridge will process ore into final products entirely on-site and create and support 275-300 permanent on-site positions during operations. In October 2025, Ioneer released updated project economics which halved processing time and increased annual lithium hydroxide and annual boric acid production to 27,800 tonnes per annum (tpa) and 135,500 tpa, respectively. "Rhyolite Ridge has been a decade in the making — through ongoing partnerships, permitting, and financing. Working with trusted Korean partners with a track record of on-time and on-budget delivery brings us closer to breaking ground and delivering urgently needed lithium and boron," said Bernard Rowe, Managing Director, Ioneer. "We’re delighted to work with KIND and Hyundai Engineering and look forward to what we’ll accomplish together." "KIND, as a specialized PPP investment institution under the MOLIT, has been actively advancing investments in U.S. energy, infrastructure, and critical minerals projects," said Chris Soeung Kim,
Director of plant business division, KIND. "We view this project as a major milestone that will further strengthen bilateral cooperation and deepen the strategic partnership between the Republic of Korea and the United States." "Across the metrics that matter most – permitting, construction readiness, and long-term supply certainty – Rhyolite Ridge stands apart from other critical mineral projects," said Seung Dong Lee, Head of process plant business execution office, Hyundai Engineering." This letter of intention to participate in the engineering, procurement and design reflects our commitment to pursuing shared interests, securing a reliable critical minerals supply chain for the industries we serve and our confidence in Ioneer’s leadership." "Securing domestic critical minerals is an economic imperative. These letters of intent from KIND and Hyundai Engineering reflect the sophistication and strength of Rhyolite Ridge," said James Calaway, Ioneer Executive Chairman. "We are now one step closer to a Final Investment Decision and the construction of this once-in-a-generation asset for U.S. critical minerals production." The entry into these strategic LOIs strengthens Ioneer’s relationship with the Republic of Korea. In 2021, Ioneer signed a binding offtake agreement with EcoPro Innovation, a world-leading high-nickel cathode producer. The LOIs are non-binding and do not create legally enforceable obligations on the part of KIND and Hyundai Engineering to invest in or otherwise support the development of Rhyolite Ridge. There can be no certainty that legally binding arrangements will be entered into. —ENDS—
About Ioneer Ioneer Ltd. is an emerging lithium–boron producer and the 100% owner of the Rhyolite Ridge Lithium- Boron Project. Rhyolite Ridge is one of only a small number of lithium-boron ore deposits globally and a linchpin project in Nevada’s burgeoning Lithium Loop. Rhyolite Ridge closed a US$996 million loan with the DOE's Office of Energy Dominance Financing in January 2025. In October 2024, Ioneer received the final federal permit for the Project from the Bureau of Land Management, concluding the formal federal permitting process which began in early 2020. Ioneer signed separate offtake agreements with Ford Motor Company and Prime Planet Energy & Solutions (joint venture between Toyota and Panasonic) in 2022 and Korea’s EcoPro Innovation in 2021. To learn more about Ioneer, visit www.Ioneer.com/investors or join our online communities on X , Facebook, LinkedIn, Instagram and YouTube.
About KIND The Korea Overseas Infrastructure & Urban Development Corporation (KIND) is a specialized public institution established under the Ministry of Land, Infrastructure and Transport (MOLIT) of the Republic of Korea. KIND is mandated to support Korean companies in advancing overseas infrastructure and
public-private partnership (PPP) projects by providing equity investment, structured financing, and project development support.
KIND operates across a broad range of sectors including transportation, energy, urban development, and critical minerals, in partnership with multilateral development banks, commercial banks, governments, and private developers. As a dedicated PPP investment institution, KIND plays a central role in expanding Korea's overseas infrastructure footprint while advancing bilateral economic cooperation with partner nations.
I am pleased to report that ioneer is in a favorable position to move the Rhyolite Ridge Lithium-Boron Project to a Final Investment Decision (FID). Since we last spoke, our sole focus has been on achieving our critical financing milestone and doing it in a way that maximizes the potential risk adjusted return for shareholders.
Because Rhyolite Ridge is shovel ready, we continue to see considerable interest in our project. The project is uniquely positioned to contribute to onshoring U.S. critical mineral production and create U.S. jobs at time when both are urgently needed. General market conditions are bringing new support for large, construction-ready greenfield projects like ours. With prices higher, the case for making large capital investments like Rhyolite Ridge are easier to support.
We are deeply engaged in working with private sector, the U.S. Government and critical trading partners to secure the resources to build our project and lead the efforts to build end-product production for both lithium chemicals and boric acid.
Disclaimer 2 This presentation has been prepared as a summary only and does not contain all information about ioneer Ltds (ioneer or the Company) assets and liabilities, financial position and performance, profits and losses, prospects, and the rights and liabilities attaching to ioneer’s securities. The securities issued by ioneer are considered speculative and there is no guarantee that they will make a return on the capital invested, that dividends will be paid on the shares or that there will be an increase in the value of the shares in the future. ioneer does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this presentation. Recipients of this presentation should carefully consider whether the securities issued by ioneer are an appropriate investment for them in light of their personal circumstances, including their financial and taxation position. Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company's securities.
Australian Securities Exchange
Level 4, Exchange Centre
SYDNEY NSW 2000
Results of 2026 Annual General Meeting
In accordance with Listing Rule 3.13.2 and section 251AA of the Corporations Act 2001 (Cth), the results of the resolutions put to shareholders at today’s ioneer Ltd Annual General Meeting are included in the attached document.
All resolutions put to the meeting were carried by way of a poll. All resolutions were carried. Details of the resolutions and the proxies received in respect of each resolution are set out in the attached proxy summary.
This announcement was authorised for release by the Company Secretary of ioneer Ltd.
Olga Smejkalova
Company Secretary
—ENDS—
ioneer Ltd
Annual General Meeting
Thursday, 21 May 2026
Results of Meeting
The following information is provided in accordance with section 251AA(2) of the Corporations Act 2001 (Cth) and ASX Listing Rule 3.13.2.
For the period ending 31 March 2026
Highlights
• Completed an equity raise for approximately US$50 million (A$72 million) with participation from new and existing shareholders, including high quality offshore and domestic institutions.
• Company in a strong financial position through completion of the Strategic Partnering Process, a Final Investment Decision and Early Construction Works.
• The U.S. District Court for the District of Nevada upheld the federal permit for Rhyolite Ridge.
• Issued the Technical Report under Subpart 1300 of the U.S. Securities and Exchange Regulations S-K, incorporating the materially improved project economics due to reduction in leach duration.
• Ongoing engagement with U.S. Government and potential strategic partners.
30 April 2026 – Ioneer Ltd (“Ioneer” or the “Company”) (ASX: INR, Nasdaq: IONR), an emerging lithium-boron supplier, is pleased to report on its activities for the quarter ending 31 March 2026 (the “March 2026 Quarter”) and provide an update on the development of its 100%-owned Rhyolite Ridge Lithium-Boron Project (“Rhyolite Ridge” or the “Project”).
I am pleased to invite you to the 2026 ioneer AGM (AGM or Meeting) to be held on 21 May 2026 commencing at 10.00 am (AEST). The AGM is an important part of the ioneer calendar, and shareholders are encouraged to review the accompanying materials and participate in the Meeting.
This year’s AGM will be conducted as a fully virtual meeting, held online via the Lumi AGM platform. There will be no physical meeting venue. All shareholders will be able to attend, ask questions and vote electronically at the AGM, either by participating live online or by appointing a proxy.
Further information on how to participate in the Meeting is provided on pages 5 and 6 of this Notice of Meeting.
Essential information
The Notice of Meeting along with other Meeting related information is available for shareholders to view and download at https://boardroomlimited.com.au/meeting/ioneer26
Voting by proxy
If you are unable to attend the AGM online and wish to vote, please complete and return your proxy form no later than 10.00 am (AEST) on Tuesday, 19 May 2026. Further details on how to submit your proxy form are set out in the Notice of Meeting and in the proxy form.
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com
Statement from Ioneer Ltd. April 8, 2026 – Reno, Nevada – Ioneer Ltd. (“Ioneer”) (ASX: INR, Nasdaq: IONR) (Ioneer) issued the following statement in response to an appeal filed today in Nevada’s Ninth Judicial District Court. Chad Yeftich, Ioneer Vice President of Corporate Development and External Affairs, said: “Ioneer has worked closely with state, federal and tribal representatives, as well as the Fish Lake Valley community, to responsibly develop the Rhyolite Ridge Lithium-Boron Project. We are confident the District Court decision will be affirmed on appeal. We stand by the rigorous, yearslong review that underpins our approved federal permit. Rhyolite Ridge will create hundreds of new American jobs and reduce reliance on foreign materials and processing. We look forward to providing a secure domestic source of two critical minerals and bringing this strategic asset online.” —ENDS—
About Ioneer
Ioneer Ltd. is an emerging lithium–boron producer and the 100% owner of the Rhyolite Ridge LithiumBoron Project. Rhyolite Ridge is one of only a small number of lithium-boron ore deposits globally and a linchpin project in Nevada’s burgeoning Lithium Loop. Rhyolite Ridge closed a US$996 million loan with the U.S. Department of Energy’s Energy Dominance Financing Program in January 2025. In October 2024, Ioneer received the final federal permit for the project from the Bureau of Land Management, concluding the formal federal permitting process which began in early 2020. Ioneer signed separate offtake agreements with Ford Motor Company and Prime Planet Energy & Solutions (joint venture between Toyota and Panasonic) in 2022 and Korea’s EcoPro Innovation in 2021. To learn more about Ioneer, visit www.Ioneer.com/investors or join our online communities on X, Facebook, LinkedIn, Instagram and YouTube.
Important Notice and Disclaimer Forward-Looking Statement
This announcement contains certain forward-looking statements and comments about future events, including Ioneer’s expectations about the Project and the performance of its businesses. Forward looking statements can generally be identified by the use of forward-looking words such as ‘expect’, ‘anticipate’, ‘likely’, ‘intend’, ‘should’, ‘could’, ‘may’, ‘predict’, ‘plan’, ‘propose’, ‘will’, ‘believe’, ‘forecast’, ‘estimate’, ‘target’ and other similar expressions within the meaning of securities laws of applicable jurisdictions. Indications of, and guidance on, the Conditional Commitment, financing plans, future earnings or financial position or performance are also forward-looking statements. Forward-looking statements involve inherent risks and uncertainties, both general and specific, and there is a risk that such predictions, forecasts, projections and other forward-looking statements will not be achieved. Forward-looking statements are provided as a general guide only and should not be relied on as an indication or guarantee of future performance. Forward looking statements involve known and unknown risks, uncertainty and other factors which can cause Ioneer’s actual results to differ materially from the plans, objectives, expectations, estimates, and intentions expressed in such forward-looking statements and many of these factors are outside the control of Ioneer. Such risks include, among others, uncertainties related to the finalisation, execution, and funding of the DOE financing, including our ability to successfully negotiate definitive agreements and to satisfy any funding conditions, as well as other uncertainties and risk factors set out in filings made from time to time with the U.S. Securities and Exchange Commission and the Australian Securities Exchange. As such, undue reliance should not be placed on any forward-looking statement. Past performance is not necessarily a guide to future performance and no representation or warranty is made by any person as to the likelihood of achievement or reasonableness of any forwardlooking statements, forecast financial information or other forecast. Nothing contained in this announcement, nor any information made available to you is, or shall be relied upon as, a promise, representation, warranty or guarantee as to the past, present or the future performance of Ioneer. Except as required by law or the ASX Listing Rules, Ioneer assumes no obligation to provide any additional or updated information or to update any forward-looking statements, whether as a result of new information, future events or results, or otherwise.
Investor Relations
Chad Yeftich, Ioneer USA Corporation Investor Relations T: +1 775 993 8563 E: [email protected]
Media Relations
Daniel Francis, FGS Global E: [email protected]
31 March 2026 – SYDNEY, Australia – Ioneer Ltd (“Ioneer”) (ASX: INR, NASDAQ: IONR) is pleased to announce that The U.S. District Court for the District of Nevada today issued its decision in Center for Biological Diversity v. Stone-Manning, upholding the approval of the Rhyolite Ridge mine plan.
The Rhyolite Ridge Lithium-Boron Project (Project) will mine and process two critical minerals in Nevada. The Project will provide a significant new source of two materials necessary for permanent magnets, batteries, semiconductors, behind-the-meter energy and military applications — strengthening the U.S. supply chain, reducing reliance on foreign sources, and bolstering national security.
The Court found that the Bureau of Land Management (BLM) and U.S. Fish and Wildlife Service (USFWS) complied with the Endangered Species Act, Federal Land Policy and Management Act, and National Environmental Policy Act in their review and approval of the project.
Ioneer issued the following statement:
“Ioneer is pleased that the District Court denied all challenges to the Rhyolite Ridge mine plan.
Corporate Governance Council Principles and Recommendations
Name of entity
ABN/ARBN
Financial year ended:
Our corporate governance statement1 for the period above can be found at:2
☐
These pages of our annual report:
☒
This URL on our website:
https://www.ioneer.com/about/governance-policies
The Corporate Governance Statement is accurate and up to date as at 18 March 2026 and has been approved by the board.
The annexure includes a key to where our corporate governance disclosures can be located.3
Date:
18 March 2026
Name of authorised officer authorising lodgement:
Olga Smejkalova
1 “Corporate governance statement” is defined in Listing Rule 19.12 to mean the statement referred to in Listing Rule 4.10.3 which discloses the extent to which an entity has followed the recommendations set by the ASX Corporate Governance Council during a particular reporting period.
Listing Rule 4.10.3 requires an entity that is included in the official list as an ASX Listing to include in its annual report either a corporate governance statement that meets the requirements of that rule or the URL of the page on its website where such a statement is located.
Year Ended 31 December 2025
Ioneer Ltd (the Company) is committed to having the highest standards of ethical behaviour and an effective system of corporate governance for the Company, commensurate with the size of the Company and the scope of its business operations.
In accordance with ASX Listing Rule 4.10.3, set out below are the applicable ASX Corporate Governance Council’s eight Principles and Recommendations 4th edition (ASX Governance Principles) and how the Board has applied each principle and recommendation for the financial year ended 31 December 2025.
The Company is fully supportive of the ‘if not, why not’ disclosure-based approach to governance adopted by the ASX Governance Principles and the recognition within them that there is no single model of corporate governance, and that good corporate governance practice is not restricted to adopting the recommendations contained in the ASX Governance Principles. The Company’s policies and practices comply with the ASX Governance Principles except to the extent otherwise indicated.
Announcement Summary
Entity name
Announcement Type
New announcement
Date of this announcement
Thursday February 05, 2026
The +securities to be quoted are:
+Securities issued as part of a transaction or transactions previously announced to the market in an Appendix 3B
Total number of +securities to be quoted
code
Security description
Number of +securities to
be quoted Issue date
INR
ORDINARY FULLY PAID
400,000,000
05/02/2026
Refer to next page for full details of the announcement
Appendix 2A - Application for quotation of securities
1 / 6
Part 1 - Entity and announcement details
1.1 Name of entity
IONEER LTD
We (the entity named above) apply for +quotation of the following +securities and agree to the matters set out in Appendix 2A of the ASX Listing Rules.
U.S. Onshoring of Two Critical Minerals
Highlights
• Firm commitments for an institutional placement to raise gross proceeds of approximately US$50 million (approximately A$72 million) at A$0.18 per share (~US$0.13)
• Strong commitments from new and existing shareholders, including a number of high quality offshore and domestic institutions, reflecting the world class nature of Rhyolite Ridge
• Equity raise will provide critical funding that will put the Company in a strong financial position through completion of the Strategic Partnering Process, a Final Investment Decision and Long Lead Items and Early Construction Works
• Rhyolite Ridge stands ready to onshore U.S. production of two critical materials and is the only permitted, shovel ready lithium-boron project in the U.S.
2 IMPORTANT: You must read the following before continuing. This presentation has been prepared by ioneer Ltd (ABN 76 098 564 606) (and / or its subsidiaries, as the context requires, “Company”, “ioneer” or “INR”) in relation to an institutional placement(“Placement”, “Offer” or “Institutional Placement”) of new ordinary shares in the Company (“New Shares”). The Placement will be made to certain eligible institutional and sophisticated investors. The Placement is managed by the Joint Lead Managers, Bell Potter Securities Limited and Canaccord Genuity (Australia) Limited (“Joint Lead Managers"). Summary Information This presentation contains summary information about the Company and its activities and is current as at 30 January 2026. The information in this presentation is of a general background and does not purport to be complete or provide all information that an investor should consider when making an investment decision, nor does it contain all the information which would be required in a prospectus, product disclosure statement or other disclosure document prepared in accordance with the requirements of the Corporations Act 2001 (Cth) (“Corporations Act”).
For the period ending 31 December 2025
Highlights
• Further Leach Optimisation Enhances Project Economics
o 19% increase in unlevered life of mine NPV to US$2,237 million
o 8% increase in unlevered life of mine IRR to 18%
o 9% increase in annual lithium hydroxide production to 27,800 tpa
o 7% increase in annual boric acid production to 135,500 tpa
o All-in sustaining cash cost of US$4,628 per metric tonne lithium carbonate equivalent
• Ongoing engagement with U.S. Government and potential Strategic Partners
• Boron added to the US Government’s Critical Minerals list and highlighted for domestic small-scale processing
23 January 2026 – Ioneer Ltd (“Ioneer” or the “Company”) (ASX: INR, Nasdaq: IONR), an emerging lithium-boron supplier, is pleased to report on its activities for the quarter ending 31 December 2025 (the “December 2025 Quarter”) and provide an update on the development of its 100%-owned Rhyolite Ridge Lithium-Boron Project (“Rhyolite Ridge” or the “Project”).
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com
Ioneer and Empire Announce Services Partnership for Rhyolite Ridge Lithium-Boron Project January 14, 2026 – Reno, Nevada – Ioneer Ltd. (ASX: INR, Nasdaq: IONR) (Ioneer) and Empire Southwest, LLC (Empire), the Caterpillar dealer serving the service territory of Arizona, Nevada and parts of eastern California, today announced the signing of a Master Service Agreement for sales, services, goods, technology, and equipment rental to support the development and operation of the Rhyolite Ridge LithiumBoron Project in Nevada. The agreement identifies key initiatives to sustain successful mining operations and creates a formal partnership between the two companies. Rhyolite Ridge, located in Esmeralda County, approximately halfway between Reno and Las Vegas, hosts the largest undeveloped lithium-boron Ore Reserve in the world outside of Turkey. The project will play a vital role in supplying and processing two critical materials at its on-site facility for re-shoring U.S. manufacturing. “Partnering with Empire gives Ioneer added support and expertise as we move into an important operational phase in driving U.S. mining innovation, sustainability, and the secure production of lithium and boron – two urgently needed U.S. critical minerals,” said Matt Weaver, Ioneer’s Senior Vice President of Engineering & Operations. “Rhyolite Ridge is a multigenerational deposit and we anticipate this being a multigenerational partnership.” “We are pleased to partner with Ioneer on the Rhyolite Ridge Lithium-Boron Project, which represents a significant step forward for mining production in the United States,” said Dan Harms, Vice President of Mining at Empire Southwest. “This partnership underscores Empire’s commitment to supporting innovative projects that drive progress, create jobs, and deliver long-term value to our industry and communities.” The milestone follows Ioneer’s recent announcement which cut a key component of ore processing time in half while increasing annual lithium and boron chemical production by 30% and 15%, respectively, during the first 25 years of operations. The Rhyolite Ridge project will create hundreds of jobs and generate an estimated $30 million annually in fiscal revenue for state and local governments. Construction at Rhyolite Ridge is slated to begin in 2026 with commercial operations commencing in 2029.
About Ioneer Ioneer Ltd. is an emerging lithium–boron producer and the 100% owner of the Rhyolite Ridge Lithium-Boron Project. Rhyolite Ridge is one of only a small number of lithium-boron ore deposits globally and a linchpin project in Nevada’s burgeoning Lithium Loop. Rhyolite Ridge closed a US$996 million loan with the U.S. Department of Energy’s Energy Dominance Finance Program in January 2025. In October 2024, Ioneer received the final federal permit for the project from the Bureau of Land Management, concluding the formal federal permitting process which began in early 2020. Ioneer signed separate offtake agreements with Ford Motor Company and Prime Planet & Energy Solutions (joint venture between Toyota and Panasonic) in 2022 and Korea’s EcoPro Innovation in 2021. To learn more about Ioneer, visit www.Ioneer.com/investors or join our online communities on X, Facebook, LinkedIn, Instagram and YouTube.
ABN 76 098 564 606 ASX: INR Nasdaq: IONR
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com
About Empire Southwest Empire Southwest is an authorized Cat® dealer for heavy equipment and power systems throughout Arizona, Nevada and Eastern California. In addition, Empire is a provider of Tier 1 commercial solar products and microgrids, an authorized AGCO equipment dealer representing Fendt and Massey Ferguson, an authorized Trimble dealer through SITECH Southwest, and a premiere distributor of Maintainer, Trail King and other leading truck and trailer brands. The third-generation, family-owned company was founded in 1950 and has over 4,100 employees across over 30 locations. Learn more about Empire's products, services, partnerships, and careers at empirecat.com.
Investor Relations Chad Yeftich, Ioneer USA Corporation Investor Relations T: +1 775 993 8563 E: [email protected]
Media Relations Daniel Francis, FGS Global E: [email protected]
2
ABN 76 098 564 606 ASX: INR Nasdaq: IONR
Suite 16.01 Level 16, 213 Miller Street North Sydney NSW 2060 www.Ioneer.com
Rhyolite Ridge: Well-Positioned for 2026 December 19, 2025 – SYDNEY, Australia – As we close out 2025, we want to take a moment to thank our stakeholders - shareholders, community members, vendors, and partners for their continued support of the Rhyolite Ridge Lithium-Boron Project (Rhyolite Ridge) as we stand ready to reduce American dependence on foreign suppliers of critical minerals. This year has been marked by significant progress, and we enter 2026 with clarity of purpose and strategic momentum. In January, Rhyolite Ridge closed a US$996 million loan with the U.S. Department of Energy – Office of Energy Dominance Financing - one of the largest federal commitments to domestic critical mineral production. 1 Combined with full federal permitting, strong bipartisan support, secured offtake agreements, and over 70% engineering design completeness, Rhyolite Ridge is shovel-ready and is the most advanced lithium-boron project in the United States. In June we published an updated Reserve and Economic Report that updated our Definitive Feasibility Study and throughout the second half of 2025 our technical team finalized substantial improvements to project economics through systematic process optimization. In October 2025 we reported that our ore Reserve contains 7.76 million tonnes of boric acid and 2.04 million tonnes of lithium carbonate, supporting an initial 77-year mine plan. 2 On a Lithium Carbonate Equivalent (LCE) basis, the project sits firmly within the lowest cost quartile globally, supported by the co-production of boric acid - a unique differentiator that enhances both economic resilience and market flexibility. Testwork successfully reduced leach residence time from 3 days to 1.5 days, materially enhancing production capacity and project economics. These improvements increased average annual lithium production for Years 1-25 from 19,200 tonnes to 24,500 tonnes LCE - a 28% increase - while boosting average annual boric acid production from 116,400 tonnes to 135,500 tonnes - a 16% increase. Critically, these gains were achieved with minimal increase in project capital costs and no change to process plant design.
Note the DOE LPO loan is comprised of $968 million in principal and $28 million in capitalised interest and has conditions to first draw. See Company announcement titled, “Rhyolite Ridge Lithium-Boron Project closes upsized US$996 million loan,” dated 20 January 2025, for further information. 2 All ore reserve figures represent estimates as of October 2025. Ore reserve estimates are not precise calculations, being dependent on the interpretation of limited information on the location, shape and continuity of the occurrence and on the available sampling results. The totals have been rounded to reflect the relative uncertainty of the estimate. Totals may not sum due to rounding. 1
In November, the U.S. Department of the Interior added boron to the Final 2025 List of Critical Minerals. This designation enhances Rhyolite Ridge's strategic profile and strengthens U.S. domestic critical mineral supply chains. Boron's recognition reflects its essential role in national security applications, including advanced armor, high-strength magnets, and nuclear shielding. Rhyolite Ridge will mine and processes not one, but two federally recognized critical minerals. With the support of Goldman Sachs, we continue to advance our global strategic partnering process, initiated in July 2025. This process seeks to secure long-term partners that demonstrate financial rigor and strategic alignment - capable of advancing the project decisively through construction and into production. Given the current sector and geopolitical environment, we expect this process to conclude within the first half of 2026. Rhyolite Ridge remains the only known lithium deposit globally amenable to vat and heap leaching, enabling on-site production of high-purity lithium and boron chemicals. This technical advantage positions the project to support future expansions and meet rapidly growing U.S. strategic demand for both products. As we approach the decisive phase of securing our strategic partner and achieving Final Investment Decision (FID), our priorities remain clear: finalize the global partnering process; advance the project to full construction readiness; and preserve our strategic optionality, positioning Rhyolite Ridge as a globally relevant supplier of lithium and boron chemicals for decades to come. The momentum we have built in 2025 gives us confidence that the coming year will mark a transformational period - one in which years of vision, perseverance, and disciplined execution translate into tangible, long-term value. Rhyolite Ridge represents an essential step toward transforming domestic critical mineral production anchoring the United States' position as a significant producer of lithium chemicals suitable for direct use in battery production and boric acid essential to national security applications. We are grateful for your partnership and support as we work to realize this vision. On behalf of the entire Ioneer team, we wish you and your families a safe and joyful holiday season. --ENDS—
About Ioneer Ioneer Ltd is an emerging lithium–boron producer and the 100% owner of the Rhyolite Ridge LithiumBoron Project. Rhyolite Ridge is the only known lithium-boron deposit in North America, one of only two known such deposits in the world and a linchpin project in Nevada’s burgeoning Lithium Loop.
Rhyolite Ridge closed a US$996 million loan with the U.S. Department of Energy Loan Programs Office under the Advanced Technology Vehicles Manufacturing program in January 2025. In October 2024, Ioneer received the final federal permit for the project from the Bureau of Land Management, concluding the formal federal permitting process which began in early 2020. Ioneer signed separate offtake agreements with Ford Motor Company and Prime Planet & Energy Solutions (joint venture between Toyota and Panasonic) in 2022 and Korea’s EcoPro Innovation in 2021. To learn more about Ioneer, visit www.Ioneer.com/investors or join our online communities on X, Facebook, LinkedIn, Instagram and YouTube.
Important notice and disclaimer Forward Looking Statements Various statements in this presentation constitute statements relating to intentions, future acts and events which are generally classified as “forward looking statements”. These forward-looking statements are not guarantees or predictions of future performance and involve known and unknown risks, uncertainties and other important factors (many of which are beyond the Company’s control) that could cause those future acts, events and circumstances to differ materially from what is presented or implicitly portrayed in this presentation. For example, future reserves described in this presentation may be based, in part, on market prices that may vary significantly from current levels. These variations may materially affect the timing or feasibility of particular developments. Words such as “anticipates”, “expects”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “potential” and similar expressions are intended to identify forward-looking statements. Ioneer cautions security holders and prospective security holders to not place undue reliance on these forward-looking statements, which reflect the view of Ioneer only as of the date of this presentation. The forward-looking statements made in this presentation relate only to events as of the date on which the statements are made. Except as required by applicable regulations or by law, Ioneer does not undertake any obligation to publicly update or review any forward-looking statements, whether as a result of new information or future events. Past performance cannot be relied on as a guide to future performance.
Investor Relations
Chad Yeftich, Ioneer USA Corporation Investor Relations T: +1 775 993 8563 E: [email protected]
Media Relations
Daniel Francis, FGS Global E: [email protected]
Prompts
Click prompts to add them under the company line, click again to take one out, then copy the result into your AI chat. Shared by Asian Century Stocks and Uncovered Thai Stocks. Thank you.
Company History
Name and ticker changes, and re-registrations under a new regulatory id. When a ticker stopped being used is not recorded, so former tickers are undated.
| Date | Change | Detail |
|---|---|---|
| Jun 30, 2023 | Reporting currency | Its US reports are in USD instead of AUD from this period. Earlier figures are shown in USD, converted at each period end's exchange rate. |
ETFs Holding ioneer Ltd
Exchange-traded funds whose newest published daily portfolio holds one of the company's listings, largest weight first.