|
Champion Iron Limited is a mining company engaged in the production of high-purity iron ore concentrate and the development and exploration of iron ore properties in the Labrador Trough, Canada. The company operates in Québec and Newfoundland and Labrador, with a focus on producing high-purity iron ore for the steel industry. In April 2026, Champion Iron completed the acquisition of Rana Gruber, a Norwegian producer of high-purity iron ore, expanding its production capabilities and geographic footprint. The company also operates the DRPF project, which produces DR quality iron ore. Champion Iron serves global markets through its iron ore production and development activities, with a focus on high-purity products. The company maintains a presence in Canada and Norway, leveraging its assets in the Labrador Trough and Rana Gruber's operations in Norway. Champion Iron is listed on the TSX, ASX, and OTCQX, reflecting its international investor base. The company continues to develop its iron ore properties and expand its production capacity to meet global demand for high-purity iron ore. Summarised from the company's own disclosures, fiscal year ended Mar 2026 |
Industry Materials | Homepage championiron.com |
| Sector Basic Materials | IR page championiron.com/investors | |
|
Tags
iron ore, high-purity iron ore, mining, iron ore concentrate, dr quality iron ore, labrador trough, québec, newfoundland and labrador, norway, steel industry, Rana Gruber, DRPF project, Québec Iron Ore
|
Press page — |
Metrics
| Valuation | |
|---|---|
| Market cap | A$ 1.17B |
| Market cap (USD) | $ 794.225M |
| P/E | — |
| PEG | — |
| P/BV | — |
| P/S | — |
| P/OCF | — |
| P/FCF | — |
| Dividend yield | — |
| Turnover / mcap | — |
| Returns | |
|---|---|
| ROE | 11.4% |
| ROI | 11.0% |
| ROIC | 11.0% |
| Profit margin | 9.5% |
| Growth | |
|---|---|
| Revenue growing | Yes |
| Profits growing | No |
| Revenue up 3y | Yes |
| Revenue up 5y | No |
| Earnings growth 3y (net profit CAGR) | -5.6% |
| Quality | |
|---|---|
| Profitable | Yes |
| Margin expanding | No |
| Buying back stock | No |
| Diluting (TTM) | Yes |
| Debt/Equity | — |
| Podcast bulls (TTM) | Sign up |
| Podcast bears (TTM) | Sign up |
| Podcast sentiment (TTM) | Sign up |
| Podcast sentiment % (TTM) | Sign up |
| News sentiment (TTM) | 0 |
| Quality score | 14.3% |
| Insiders | |
|---|---|
| Buys, 1w | Sign up |
| Buys, 1m | Sign up |
| Buys, 1y | Sign up |
| Sells, 1w | Sign up |
| Sells, 1m | Sign up |
| Sells, 1y | Sign up |
Podcast Mentions
Announcements lodged with ASX, newest first, routine forms (director and substantial-holding notices, daily buy-back and quotation notices) included. The link opens the announcement on ASX. Press releases from the company's own website, newest first.
Nouvelles
Consultez notre infolettre (PDF) »
CHAMPION IRON ANNONCE SES RÉSULTATS POUR LE DEUXIÈME TRIMESTRE DE L'EXERCICE FINANCIER 2027
-
Production trimestrielle de 3,9 Mtmh, ventes consolidées records de 4,5 Mtms, produits de 404 M$ et BAIIA ajusté de 23 M$1
-
Première expédition commerciale de minerai de fer de qualité RD issu du projet RDPB complétée
-
Cargaisons d'essai de matériel RDPB supplémentaires et nouveaux accords commerciaux confirmés pour des expéditions prévues au T3 de l'exercice financier 2027
MONTRÉAL, le 28 oct. 2026 /CNW/ -- SYDNEY, le 29 octobre 2026 - Champion Iron Limited (ASX : CIA) (TSX : CIA) (OTCQX : CIAFF) (« Champion » ou la « Société ») annonce ses résultats opérationnels et financiers pour son deuxième trimestre financier terminé le 30 septembre 2026.
Le chef de la direction de Champion, M. David Cataford, a déclaré : « Alors que nous opérons dans des conditions difficiles et un contexte de volatilité accrue, nous demeurons privilégiés de pouvoir compter sur l'engagement de nos équipes, l'appui de nos communautés d'accueil ainsi que sur un solide réseau de partenaires financiers qui reconnaissent la qualité de nos actifs et la valeur à long terme de notre stratégie. La réalisation d'une première vente de matériel RDPB marque une étape importante pour nous, et les expéditions commerciales additionnelles prévues au cours du prochain trimestre reflètent l'intérêt grandissant du marché pour ce produit, ainsi que le potentiel d'élargir notre portée auprès de clients accessibles par des routes maritimes plus courtes. Après avoir complété un important cycle d'investissement pluriannuel au Lac Bloom, notre priorité consiste désormais à optimiser nos actifs, à renforcer notre bilan financier et à poursuivre nos initiatives de réduction des coûts. »
Détails relatifs à l'appel conférence
Champion tiendra un appel conférence et une webdiffusion le 29 octobre 2026 à 9 h (heure de Montréal) / le 30 octobre 2026 à 0 h (heure de Sydney) pour discuter des résultats de son deuxième trimestre financier terminé le 30 septembre 2026. Les détails relatifs à l'appel conférence sont fournis à la fin du présent communiqué de presse.
Note aux lecteurs
À la suite de l'acquisition de Rana Gruber AS (« Rana Gruber ») le 10 avril 2026 (« l'acquisition de Rana Gruber »), et afin d'assurer une transparence accrue à l'égard de la performance du Lac Bloom et de Rana Gruber, les données opérationnelles et financières sélectionnées sont présentées séparément pour chaque site à la section 2 du présent communiqué de presse. Il est également important de souligner qu'à la suite de cette acquisition, Champion a harmonisé l'information financière de Rana Gruber avec ses propres pratiques de présentation de l'information financière. Par conséquent, il convient de faire preuve de prudence lors de la comparaison des résultats de la période courante avec les résultats historiques de Rana Gruber publiés avant la réalisation de l'acquisition, ainsi qu'avec les résultats précédemment publiés par Champion. Des renseignements supplémentaires sur l'acquisition de Rana Gruber sont présentés dans les états financiers consolidés résumés non audités pour le trimestre et le semestre terminés le 30 septembre 2026 (les « états financiers ») et le rapport de gestion connexe (le « rapport de gestion ») de la Société, disponibles auprès de l'ASX à l'adresse www.asx.com.au , sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à l'adresse www.championiron.com .
1. Faits saillants du trimestre
Opérations et développement durable
- Aucun accident de travail sérieux ni aucun incident environnemental significatif n'a été signalé durant le trimestre terminé le 30 septembre 2026;
- La production trimestrielle a totalisé 3,9 Mtmh de concentrés de minerai de fer de haute pureté pour le trimestre terminé le 30 septembre 2026, en progression de 9 % comparativement à la même période de l'année précédente, reflétant la contribution de Rana Gruber (0,5 Mtmh), en partie contrebalancée par les volumes de production plus faibles au Lac Bloom (3,3 Mtmh) qui ont été affectés par les inefficacités découlant des activités de mise en service du projet RDPB, conformément aux attentes de la direction pour la période de mise en service;
- Ventes trimestrielles consolidées records de 4,5 Mtms de concentrés de minerai de fer de haute pureté pour le trimestre terminé le 30 septembre 2026, en hausse de 17 % comparativement à la même période de l'année précédente, reflétant les forts volumes de ventes du Lac Bloom (3,9 Mtms) et de Rana Gruber (0,6 Mtms), de telle sorte que les niveaux de stocks ont diminué dans les deux cas; et
- Première expédition commerciale de produits RDPB réalisée au cours du trimestre, cargaisons d'essai supplémentaires et nouveaux accords commerciaux conclus pour des expéditions prévues au troisième trimestre de l'année financière 2027, et poursuite des discussions avec des clients potentiels. Bien que les volumes de production RDPB soient restés comparables d'un trimestre à l'autre, la qualité moyenne des produits a continué de s'améliorer et se rapproche des spécifications ciblées dans le cadre du projet.
Résultats financiers
- Les résultats financiers du trimestre ont continué d'être affectés par la baisse des indices de prix pour le minerai de fer, la hausse des frais de transport maritime et les prix plus élevés pour le carburant, résultant partiellement du conflit au Moyen-Orient, ainsi que par les coûts de démarrage du projet RDPB;
- Prix de vente moyen réalisé brut de 105,5 $ US/tms1, comparativement au prix moyen de l'indice P65 de 112,8 $ US/tms pour la période;
- Prix de vente moyen réalisé net de 89,9 $/tms1 (147,8 $ CA/dmt1), en baisse de 16 % d'un trimestre à l'autre et de 30 % d'une année à l'autre;
- Coût comptant C1 pour les concentrés de minerai de fer chargés sur les navires totalisant 82,9 $/tms1 (59,2 $ US/tms)2, en hausse comparativement au coût de 76,2 $/tms1 (55,3 $ US/tms)2 enregistré à la même période en 2025. Le coût comptant C1 pour la période a continué d'être affecté par les prix élevés pour le carburant qui ont un impact sur les opérations minières, par la transition vers la production RDPB et ses coûts de traitement plus élevés, et par la répartition des coûts fixes sur des volumes de production plus faibles au Lac Bloom;
- Perte nette de 48,4 M$ (perte nette ajustée de 34,3 M$1), ce qui représente une perte par action de 0,09 $ (perte nette ajustée par action de 0,06 $1), comparativement à une perte nette de 41,5 M$ (perte par action de 0,07 $) (perte nette ajustée de 6,0 M$1 et perte nette ajustée par action de 0,01 $1) au trimestre précédent et à un résultat net de 56,8 M$ (BPA de 0,11 $) (résultat net ajusté de 56,8 M$1 et BPA ajusté de 0,11 $1) pour la même période de l'année précédente. Le résultat net comprend plusieurs éléments exclus du résultat net ajusté, dont les coûts de démarrage du projet RDPB de 6,9 M$, l'ajustement de l'évaluation des stocks en lien avec l'acquisition de Rana Gruber de 4,8 M$ et des pertes latentes de 7,9 M$ découlant de la variation de la juste valeur des instruments dérivés;
- BAIIA de 3,7 M$1 (BAIIA ajusté de 23,3 M$1) pour le trimestre terminé le 30 septembre 2026, en baisse comparativement au BAIIA de 174,8 M$1 (BAIIA ajusté de 174,8 M$1) pour la même période en 2025;
- Le solde de trésorerie, en excluant la portion inutilisée des contributions en espèces initiales de Nippon Steel Corporation (« Nippon Steel ») et de Sojitz Corporation (« Sojitz », et collectivement avec Nippon Steel, les « partenaires ») détenue par Kami Iron Mine Partnership (le « partenariat Kami »), totalisait 214,4 M$ au 30 septembre 2026, en hausse de 15,7 M$ depuis le 30 juin 2026. Cette variation reflète principalement les volumes de ventes robustes, grâce notamment à la réduction des stocks de minerai de fer, et les recettes importantes, en partie contrebalancées par les dépenses en immobilisations de maintien; et
- Liquidités disponibles de 618,4 M$1 au 30 septembre 2026, comparativement à 653,1 M$1 au 30 juin 2026.
2. Résultats financiers et opérationnels
| T2 Exercice 2027 | T1 Exercice 2027 | Variation trimestrielle | T2 Exercice 2026 | Variation annuelle | |||
| Données d'exploitation consolidées | |||||||
| Concentrés de minerai de fer produits (tmh) | 3 872 500 | 3 939 400 | (2 %) | 3 551 600 | 9 % | ||
| Concentrés de minerai de fer vendus (tms) | 4 494 100 | 3 339 000 | 35 % | 3 850 900 | 17 % | ||
| Données financières consolidées (en milliers de dollars) | |||||||
| Produits | 403 932 | 356 876 | 13 % | 492 890 | (18 %) | ||
| Coût des ventes | 384 118 | 288 751 | 33 % | 293 398 | 31 % | ||
| Résultat net (perte nette) | (48 355) | (41 528) | 16 % | 56 794 | (185 %) | ||
| Résultat net ajusté (perte nette ajustée)1 | (34 264) | (5 961) | 475 % | 56 807 | (160 %) | ||
| BAIIA1 | 3 656 | 32 790 | (89 %) | 174 823 | (98 %) | ||
| BAIIA ajusté1 | 23 265 | 78 341 | (70 %) | 174 836 | (87 %) | ||
| Statistiques consolidées (en dollars par tms vendue) | |||||||
| Prix de vente moyen réalisé brut1 | 147,8 | 158,7 | (7 %) | 157,5 | (6 %) | ||
| Prix de vente moyen réalisé net1 | 89,9 | 106,9 | (16 %) | 128,0 | (30 %) | ||
| Coût comptant C11 | 82,9 | 83,7 | (1 %) | 76,2 | 9 % | ||
| CMTI1 | 97,9 | 111,3 | (12 %) | 96,9 | 1 % | ||
| Marge d'exploitation1 | (8,0) | (4,4) | 82 % | 31,1 | (126 %) |
A. Produits consolidés
Les produits ont totalisé 403,9 M$ pour le trimestre terminé le 30 septembre 2026, en baisse de 89,0 M$ comparativement aux produits de 492,9 M$ enregistrés à la même période de l'année précédente, malgré la contribution de 54,3 M$ provenant des opérations de Rana Gruber. La diminution des produits au Lac Bloom est attribuable aux prix de vente réalisés nets plus faibles, reflétant l'indice C3 élevé et le déclin des indices de prix pour le minerai de fer, ainsi que les ajustements de prix provisoires moins favorables comparativement à la même période en 2025.
Pour le trimestre terminé le 30 septembre 2026, le prix de vente moyen réalisé brut de 105,5 $ US/tms1 était inférieur à l'indice P65 moyen de 112,8 $ US/tms. Les 3,4 Mtms de minerai de fer vendues, mais toujours sujettes à des ajustements de prix au 30 septembre 2026, ont été évaluées à un prix de vente à terme moyen pondéré de 103,4 $ US/tms, ce qui est inférieur au prix moyen de l'indice P65 pour la période. L'escompte par rapport à l'indice P65 reflétait également l'exposition continue aux marchés à court terme et au comptant à prix réduit pendant la transition du Lac Bloom vers des produits de minerai de fer de qualité RD de plus grande pureté. Ces éléments ont été en partie compensés par les ventes de concentré du Lac Bloom dont les prix ont été établis au moyen de mécanismes rétrospectifs, pour lesquelles les indices de prix applicables étaient supérieurs au prix moyen de l'indice P65 pour la période.
Les frais de transport maritime et autres coûts ont totalisé 40,4 $ US/tms durant le trimestre terminé le 30 septembre 2026, ce qui représente une hausse de 39 % comparativement aux frais de 29,1 $ US/tms enregistrés à la même période de l'année précédente. Bien que l'indice C3 ait beaucoup augmenté durant le trimestre, les frais de transport maritime et autres coûts de la Société ont augmenté à un rythme plus mesuré, reflétant la stratégie de réservation des navires et les tarifs de fret favorables négociés en vertu de contrats à prix fixe pour une portion des volumes de ventes, à des prix inférieurs au niveau du marché. La hausse de l'indice C3, partiellement alimentée par le conflit en cours au Moyen-Orient, continuera vraisemblablement à affecter les revenus nets de Champion au cours des prochains mois, puisque la plupart des navires sont réservés de trois à cinq semaines avant la période de disponibilité désirée.
Pour le trimestre terminé le 30 septembre 2026, un prix de vente final moyen de 108,1 $ US/tms a été établi pour les 2,1 Mtms de concentrés de minerai de fer vendues qui étaient sujettes à des ajustements de prix provisoires au 30 juin 2026 et qui avaient été auparavant évaluées à un prix moyen estimatif de 110,4 $ US/tms. Ainsi, des ajustements de prix provisoires négatifs de 6,5 M$ (4,8 M$ US) ont été comptabilisés pour les tonnes auxquelles des prix provisoires avaient été attribués au 30 juin 2026, ce qui représente un impact négatif de 1,1 $ US/tms sur les 4,5 Mtms vendues au cours du trimestre.
En tenant compte des frais de transport maritime et autres coûts de 40,4 $ US/tms et des ajustements de prix provisoires négatifs de 1,1 $ US/tms, la Société a enregistré un prix de vente moyen réalisé net de 64,0 $ US/tms2 (89,9 $ CA/tms1) pour ses concentrés de minerai de fer de haute pureté expédiés au cours du trimestre terminé le 30 septembre 2026.
B. Résultats de la mine du Lac Bloom
Le Lac Bloom effectue l'entretien planifié de ses deux usines en tandem, aux deuxième et quatrième trimestres financiers, ce qui peut générer des variations marquées d'un trimestre à l'autre au niveau de la production et des coûts d'extraction minière et de traitement.
| T2 Exercice 2027 | T1 Exercice 2027 | Variation trimestrielle | T2 Exercice 2026 | Variation annuelle | |||
| Données d'exploitation - Lac Bloom | |||||||
| Concentrés de minerai de fer produits (tmh) | 3 323 700 | 3 547 200 | (6 %) | 3 551 600 | (6 %) | ||
| Concentrés de minerai de fer vendus (tms) | 3 907 100 | 3 128 800 | 25 % | 3 850 900 | 1 % | ||
| Ratio de déblaiement | 1,21 | 1,04 | 16 % | 1,29 | (6 %) | ||
| Teneur d'alimentation (% Fe) | 30,3 | 29,5 | 3 % | 29,6 | 2 % | ||
| Récupération du Fe (%) | 78,2 | 79,0 | (1 %) | 79,6 | (2 %) | ||
| Teneur moyenne pondérée des produits (% Fe) | 66,7 | 66,5 | -- % | 66,5 | -- % | ||
| Données financières sélectionnées - Lac Bloom (en milliers de dollars) | |||||||
| Produits | 349 624 | 332 980 | 5 % | 492 890 | (29 %) | ||
| Coût des ventes | 329 231 | 267 504 | 23 % | 293 398 | 12 % | ||
| Bénéfice brut (perte brute) | (27 300) | 27 408 | (200 %) | 155 012 | (118 %) | ||
| Statistiques sélectionnées - Lac Bloom (en dollars par tms vendue) | |||||||
| Prix de vente moyen réalisé net1 | 89,5 | 106,4 | (16 %) | 128,0 | (30 %) | ||
| Coût comptant C11 | 82,5 | 83,4 | (1 %) | 76,2 | 8 % | ||
| CMTI1 | 94,4 | 104,4 | (10 %) | 94,3 | -- % |
i. Rendement opérationnel
Le Lac Bloom a produit 3,3 Mtmh de concentrés de minerai de fer de haute pureté au cours du trimestre terminé le 30 septembre 2026, en baisse de 6 % comparativement aux 3,6 Mtmh produites à la même période en 2025, reflétant les inefficacités découlant de la récente mise en service du projet RDPB. La production trimestrielle inclut 0,6 Mtmh de concentré issu du projet RDPB, un niveau comparable au trimestre précédent, mais avec une qualité de produit qui s'améliore progressivement en moyenne pour atteindre les spécifications de pureté ciblées dans le cadre du processus de mise en service. Conséquemment, la teneur moyenne pondérée des produits a augmenté d'une année à l'autre pour s'établir à 66,7 % Fe comparativement à 66,5 % Fe. Durant le trimestre terminé le 30 septembre 2026, le taux de récupération du fer a diminué à 78,2 % par rapport à 79,6 % lors de la même période en 2025. Cela s'explique principalement par les pertes plus importantes de minerai de fer associées aux opérations du projet RDPB, qui se retrouvent dans les résidus miniers.
Le volume des ventes de concentrés de minerai de fer a surpassé la production, avec 3,9 Mtms vendues au cours du trimestre terminé le 30 septembre 2026, alors que le Lac Bloom a rattrapé les retards d'expédition du trimestre précédent en lien avec les activités de mise en service du projet RDPB. Ainsi, les stocks de concentrés de minerai de fer accumulés au Lac Bloom et au port de Sept-Îles ont diminué pour s'établir à 1,0 Mtmh au 30 septembre 2026, comparativement à 1,7 Mtmh au 30 juin 2026. Le Lac Bloom poursuit la mise en service du projet RDPB tout en continuant d'optimiser ses stratégies de gestion des stocks afin de gérer les stocks de minerai de fer de différentes qualités de concentré et améliorer la logistique de production et de vente.
Durant le trimestre terminé le 30 septembre 2026, le Lac Bloom a extrait et transporté 21,7 Mtmh de stériles et de minerai, comparativement à 22,9 Mtmh à la même période de l'année précédente. Le ratio de déblaiement pour le trimestre terminé le 30 septembre 2026 s'est établi à 1,21, conformément au plan sur la durée de vie de la mine et comparativement au ratio de 1,29 enregistré à la même période de l'année précédente.
ii. Rendement financier
Le coût des ventes associées aux opérations du Lac Bloom a totalisé 329,2 M$, comparativement à 293,4 M$ à la même période en 2025. Pour le trimestre terminé le 30 septembre 2026, les coûts d'extraction minière et de traitement du minerai ont totalisé 60,5 $/tms produite1, ce qui représente une hausse de 14 % comparativement aux coûts de 52,9 $/tms produite1 à la même période de l'année précédente, reflétant principalement la hausse des prix pour le carburant en raison du conflit au Moyen-Orient, la transition vers la production RDPB et ses coûts de traitement plus élevés, et les volumes de production plus faibles servant à amortir les coûts fixes. Les coûts de transport terrestre et de manutention portuaire comprennent des composantes fixes et variables, et sont grandement influencés par les volumes transportés de Fermont jusqu'au port de Sept-Îles. Pour le trimestre terminé le 30 septembre 2026, ces coûts se sont établis à 24,1 $/tms vendue1, comparable à la même période de l'année précédente, reflétant le volume des ventes similaire. Le coût des ventes a aussi été affecté par les variations de l'évaluation des stocks de concentrés de minerai de fer, qui tient compte des coûts d'extraction minière et de traitement du minerai engagés au trimestre précédent, ainsi que par les variations des volumes de production et de ventes. Conséquemment, le coût comptant C1 du Lac Bloom a totalisé 82,5 $/tms1, comparativement à 76,2 $/tms1 pour la même période en 2025. Le coût comptant C1 exclut les coûts de démarrage du projet RDPB, qui englobent principalement des coûts opérationnels anormaux engagés pendant que l'usine progresse vers la production commerciale.
La perte brute a totalisé 27,3 M$ pour le trimestre terminé le 30 septembre 2026, comparativement à un bénéfice brut de 155,0 M$ à la même période en 2025. Cette perte brute est principalement attribuable aux prix de vente réalisés nets plus bas combinés au coût des ventes plus élevé, se soldant par des marges brutes plus faibles sur chaque tonne vendue.
Le CMTI a totalisé 94,4 $/tms1 pour le trimestre terminé le 30 septembre 2026, comparable à la même période de l'année précédente, les coûts comptants plus élevés ayant été compensés par une diminution des dépenses en immobilisations de maintien reflétant l'étalement des investissements relatifs aux infrastructures et l'optimisation des dépenses en capital face à la conjoncture actuelle sur les marchés.
C. Résultats de la mine Rana Gruber
Toute comparaison des coûts unitaires entre les différents secteurs d'exploitation de Champion doit être interprétée en tenant compte des différences dans les méthodes de production, les opérations de traitement et les infrastructures logistiques de chaque site. Les résultats du T1 de l'exercice 2027 de Rana Gruber reflètent la période comprise entre la date d'acquisition du 10 avril 2026 et le 30 juin 2026. Ils ne représentent donc pas un trimestre complet d'exploitation; les comparaisons trimestrielles doivent être interprétées en tenant compte de ce contexte.
Au Lac Bloom, la distance entre le site minier et le port de Sept-Îles fait en sorte que les coûts de transport et de manutention sont principalement engagés lors du transport des concentrés de minerai de fer et sont donc classés dans les coûts de transport terrestre et de manutention portuaire.
À Rana Gruber, la proximité des installations de traitement au port signifie qu'une proportion plus importante des coûts de manutention est engagée avant la production de concentrés de minerai de fer et est incluse dans les coûts d'extraction minière et de traitement du minerai, tandis que les coûts de transport terrestre sont limités en raison de la distance de transport ferroviaire beaucoup plus courte que celle du Lac Bloom.
| T2 Exercice 2027 | T1 Exercice 2027 | Variation trimestrielle | ||
| Données d'exploitation - Rana Gruber | ||||
| Concentrés de minerai de fer produits (tmh) | 548 800 | 392 200 | 40 % | |
| Concentrés de minerai de fer vendus (tms) | 587 000 | 210 200 | 179 % | |
| Ratio de déblaiement à ciel ouvert | 1,59 | 2,00 | (21 %) | |
| Teneur d'alimentation (% Fe) | 32,8 | 31,7 | 3 % | |
| Récupération du Fe (%) | 76,3 | 75,3 | 1 % | |
| Teneur moyenne pondérée des produits (% Fe) | 65,0 | 65,2 | -- % | |
| Données financières sélectionnées - Rana Gruber (en milliers de dollars) | ||||
| Produits | 54 308 | 23 896 | 127 % | |
| Coût des ventes | 54 887 | 21 247 | 158 % | |
| Perte brute | (11 502) | (5 989) | 92 % | |
| Statistiques sélectionnées - Rana Gruber (en dollars par tms vendue) | ||||
| Prix de vente moyen réalisé net1 | 92,5 | 113,7 | (19 %) | |
| Coût comptant C11 | 85,3 | 87,5 | (3 %) | |
| CMTI1 | 97,1 | 147,0 | (34 %) |
i. Rendement opérationnel
Rana Gruber a produit 0,5 Mtmh de concentrés de minerai de fer de haute pureté à une teneur moyenne pondérée de 65,0 % Fe au cours du trimestre terminé le 30 septembre 2026. La production durant le trimestre a bénéficié d'un débit de traitement plus élevé à l'usine de 1,3 Mtmh à la suite de l'arrêt annuel pour l'entretien qui a eu lieu en juin 2026, combiné à une teneur d'alimentation plus élevée de 32,8 % Fe et un taux de récupération du fer de 76,3 %.
Les ventes de concentrés de minerai de fer ont totalisé 0,6 Mtms durant le trimestre, surpassant les niveaux de production principalement en raison des dates des expéditions et de la réduction des stocks de magnétite. Par conséquent, les stocks de concentrés de minerai de fer accumulés ont diminué pour s'établir à 0,3 Mtmh au 30 septembre 2026, comparativement à 0,4 Mtmh au 30 juin 2026.
ii. Rendement financier
Au cours de la période de trois mois terminée le 30 septembre 2026, le coût des ventes a totalisé 54,9 M$, tandis que le coût comptant C1 s'est élevé à 85,3 $/tms vendue1, en baisse par rapport au trimestre précédent. Le coût des ventes pour la période inclut des coûts d'extraction minière et de traitement du minerai de 34,5 M$, des coûts de transport terrestre et de manutention portuaire de 0,9 M$, une variation de 14,6 M$ des stocks de concentrés de minerai de fer accumulés et un ajustement des stocks découlant de la répartition du prix d'achat de 4,8 M$. Les coûts d'extraction minière et de traitement du minerai ont totalisé 67,9 $/tms produite¹ et ont bénéficié de niveaux de production plus élevés, d'un meilleur contrôle de l'utilisation des matières consomptibles et des efforts continus d'optimisation des coûts. Ces éléments favorables ont été partiellement contrebalancés par les prix pour le diésel et les explosifs qui sont restés élevés tout au long du trimestre. Les coûts de transport terrestre et de manutention portuaire ont totalisé 1,6 $/tms vendue1 et ont bénéficié d'un remboursement forfaitaire découlant du règlement de réclamations historiques de redevances ferroviaires publiques. Le coût comptant C1 exclut l'ajustement des stocks découlant de la répartition du prix d'achat, puisque ce dernier reflète une augmentation de la juste valeur des stocks comptabilisés dans le cadre de l'acquisition de Rana Gruber et n'est pas représentatif des coûts opérationnels sous-jacents liés à la production et à la vente de concentrés de minerai de fer.
La perte brute a totalisé 11,5 M$ pour le trimestre terminé le 30 septembre 2026, l'impact positif des volumes de ventes plus élevés ayant été plus que contrebalancé par les prix de vente réalisés plus bas découlant de la pression à la baisse sur les indices de prix pour le minerai de fer et par les coûts de transport plus élevés en raison de l'augmentation soutenue des prix pour le carburant. La perte brute a aussi été affectée par l'ajustement des stocks découlant de la répartition du prix d'achat de 4,8 M$.
Le CMTI a totalisé 97,1 $/tms1 pour le trimestre terminé le 30 septembre 2026, en forte baisse comparativement au trimestre précédent, principalement en raison d'une diminution des dépenses en immobilisations de maintien et de l'impact positif du volume de ventes plus important.
D. Résultat net (perte nette), BAIIA et BAIIA ajusté
Pour le trimestre terminé le 30 septembre 2026, la Société a subi une perte nette de 48,4 M$ (perte par action de 0,09 $), comparativement à un résultat net de 56,8 M$ (BPA de 0,11 $) à la même période de l'année précédente. Les diminutions du résultat net reflètent principalement la diminution du bénéfice brut, en partie compensée par une diminution des impôts sur le revenu et des impôts miniers, une diminution de la perte de change latente sur des passifs monétaires nets libellés en devises étrangères, ainsi qu'une diminution des paiements fondés sur des actions. Le résultat brut plus bas pour le trimestre terminé le 30 septembre 2026 inclut un montant de 6,9 M$ en coûts de démarrage pour le projet RDPB et un montant de 4,8 M$ reflétant l'ajustement de l'évaluation des stocks en lien avec l'acquisition de Rana Gruber.
Pour le trimestre terminé le 30 septembre 2026, la Société a généré un BAIIA de 3,7 M$1, ce qui représente une marge BAIIA de 1 %1, comparativement à 174,8 M$1, ce qui représente une marge BAIIA de 35 %1, pour la même période en 2025. Le BAIIA et la marge BAIIA plus faibles reflètent principalement les prix de vente réalisés nets plus bas et le coût comptant plus élevé, en partie compensés par le volume des ventes plus important.
Pour le trimestre terminé le 30 septembre 2026, le BAIIA ajusté a totalisé 23,3 M$1, comparativement à 174,8 M$1 pour la même période de l'année précédente.
E. Coût de maintien tout inclus et marge d'exploitation
Pour le trimestre terminé le 30 septembre 2026, la Société a enregistré un CMTI de 97,9 $/tms1, comparativement à 96,9 $/tms1 à la même période en 2025, les dépenses en immobilisations de maintien plus faibles du Lac Bloom, combinées aux volumes de concentrés de minerai de fer vendus plus importants, ayant partiellement compensé la hausse du coût comptant.
La Société a généré une marge d'exploitation négative de 8,0 $/tms1 pour chaque tonne de concentré de minerai de fer de haute pureté vendue au cours du trimestre terminé le 30 septembre 2026, comparativement à une marge d'exploitation positive de 31,1 $/tms1 à la même période de l'année précédente. Cette diminution reflète principalement le prix de vente moyen réalisé net plus bas combiné au CMTI qui est resté relativement stable d'une année à l'autre.
3. Activités d'exploration
Durant le trimestre et le semestre terminés le 30 septembre 2026, la Société a maintenu toutes ses propriétés en règle et n'a conclu aucune entente d'option. Durant le trimestre et le semestre terminés le 30 septembre 2026, des dépenses d'exploration et d'évaluation de 3,8 M$ et de 5,7 M$ ont été engagées, respectivement, comparativement à 6,4 M$ et 15,2 M$, respectivement, pour les mêmes périodes de l'année précédente. La diminution des dépenses d'une année à l'autre reflète le transfert des propriétés Kami au partenariat Kami, et l'acquisition par les partenaires d'une participation globale de 49 % dans le partenariat Kami en septembre 2025. La diminution reflète également les initiatives de réduction des coûts mises en œuvre à l'échelle de l'organisation, ainsi que la priorisation de certains programmes d'exploration compte tenu de la conjoncture sur les marchés.
Les dépenses d'exploration et d'évaluation ont été engagées et réalisées au Canada dans les provinces de Québec et de Terre-Neuve-et-Labrador. De plus amples détails sur les projets d'exploration, ainsi que des cartes, sont disponibles sur le site Web de la Société à l'adresse www.championiron.com à la section Opérations et Projets . Les informations présentées sur le site Web de la Société ne sont pas intégrées par renvoi au présent communiqué de presse.
4. Flux de trésorerie -- Achats d'immobilisations corporelles
| Trois mois terminés | Six mois terminés | |||||||
| le 30 septembre | le 30 septembre | |||||||
| (en milliers de dollars) | 2026 | 2025 | 2026 | 2025 | ||||
| Infrastructures de gestion des résidus miniers et de l'eau | 14 823 | 23 481 | 35 644 | 38 247 | ||||
| Activités de déblaiement et d'extraction minière | 24 583 | 18 739 | 46 219 | 31 714 | ||||
| Excavation de tunnels et infrastructures souterraines | 4 712 | -- | 8 494 | -- | ||||
| Autres dépenses en immobilisations de maintien | 9 502 | 27 690 | 41 467 | 42 190 | ||||
| Dépenses en immobilisations de maintien | 53 620 | 69 910 | 131 824 | 112 151 | ||||
| Projet RDPB | 3 244 | 20 614 | 17 462 | 68 074 | ||||
| Autres dépenses en immobilisations de développement | 25 754 | 22 675 | 34 253 | 38 349 | ||||
| Achats d'immobilisations corporelles portés aux flux de trésorerie | 82 618 | 113 199 | 183 539 | 218 574 |
Dépenses en immobilisations de maintien
Les investissements consentis pour le parc à résidus au cours du trimestre et du semestre terminés le 30 septembre 2026 s'inscrivent dans le plan à long terme de MFQ visant à soutenir les opérations sur la durée de vie de la mine. Champion continue de prioriser la gestion sécuritaire des résidus miniers en misant sur la réalisation d'inspections régulières et une surveillance constante des infrastructures, tout en poursuivant la mise en œuvre de son plan d'investissement à long terme au Lac Bloom. Les activités de construction dans le parc à résidus sont typiquement effectuées entre mai et novembre, lorsque les conditions météorologiques sont les plus favorables au Lac Bloom.
Les activités de déblaiement et d'extraction minière pour le trimestre et le semestre terminés le 30 septembre 2026 comprenaient 15,8 M$ et 33,6 M$, respectivement, en coûts de développement minier, incluant du forage topographique et de prédécoupage, dont les détails figurent dans le plan d'exploitation minière de la Société (7,3 M$ et 15,1 M$, respectivement, pour les mêmes périodes en 2025). Durant le trimestre et le semestre terminés le 30 septembre 2026, les activités de déblaiement et d'extraction minière incluaient également des montants de 8,8 M$ et de 12,7 M$, respectivement, en frais de déblaiement capitalisés (11,4 M$ et 16,6 M$, respectivement, pour les mêmes périodes en 2025).
Les dépenses liées à l'excavation de tunnels et aux infrastructures souterraines se rapportent à Rana Gruber et comprennent des travaux sur la rampe d'accès et d'autres infrastructures souterraines.
Les autres dépenses en immobilisations de maintien pour le trimestre et le semestre terminés le 30 septembre 2026 comprenaient des dépenses en lien avec les programmes de réfection de l'équipement minier. Ces dépenses s'inscrivent dans la stratégie d'investissement à long terme de la Société visant à soutenir les initiatives de croissance sur la durée de vie de la mine.
Projet RDPB
Au cours du trimestre et du semestre terminés le 30 septembre 2026, la Société a investi 3,2 M$ et 17,5 M$, respectivement, en dépenses d'immobilisations dans le cadre du projet RDPB (20,6 M$ et 68,1 M$, respectivement, pour les mêmes périodes de l'année précédente). La diminution reflète principalement le fait que les activités de construction sont en grande partie achevées, les investissements consentis depuis le début de l'année étant principalement associés aux activités de mise en service et de montée en cadence. Les investissements cumulatifs totalisaient 497,0 M$ au 30 septembre 2026.
Autres dépenses en immobilisations de développement
Pour le trimestre et le semestre terminés le 30 septembre 2026, les autres dépenses en immobilisations de développement ont totalisé 25,8 M$ et 34,3 M$, respectivement (22,7 M$ et 38,3 M$, respectivement, pour les mêmes périodes en 2025) et sont présentées plus en détail ci-dessous :
| Trois mois terminés | Six mois terminés | ||||||
| le 30 septembre | le 30 septembre | ||||||
| (en milliers de dollars) | 2026 | 2025 | 2026 | 2025 | |||
| Améliorations et mises à niveau d'infrastructures (i) | 1 727 | 12 172 | 7 744 | 15 191 | |||
| Expansion du garage d'entretien de la mine | -- | -- | -- | 457 | |||
| Dépôts ou paiements finaux pour de l'équipement minier | 11 325 | 9 404 | 11 346 | 15 623 | |||
| Autres (ii) | 12 702 | 1 099 | 15 163 | 7 078 | |||
| Autres dépenses en immobilisations de développement | 25 754 | 22 675 | 34 253 | 38 349 |
| (i) | Les dépenses liées aux améliorations et aux mises à niveau d'infrastructures englobent différents projets d'investissement visant à améliorer la performance ou la capacité des actifs et à se conformer aux diverses règlementations régissant les pratiques d'exploitation minière. |
| (ii) | Les autres dépenses comprennent des coûts d'emprunt décaissés capitalisés dans le cadre du projet RDPB et la construction de nouveaux puits de ventilation en lien avec les infrastructures souterraines à Rana Gruber. |
5. Informations relatives à l'appel conférence et à sa webdiffusion
Une webdiffusion et un appel conférence au cours desquels les résultats ci-dessus seront abordés plus en détail auront lieu le 29 octobre 2026 à 9 h (heure de Montréal) / le 30 octobre 2026 à 0 h (heure de Sydney). Les auditeurs pourront suivre une webdiffusion en direct de l'appel conférence à la section Investisseurs du site Web de la Société à l'adresse www.championiron.com/investisseurs/evenements-presentations ou en composant sans frais le +1-888-699-1199 en Amérique du Nord ou le +61-2-8017-1385 en Australie.
La webdiffusion sera archivée en ligne à des fins de consultation et sera disponible sur le site Web de la Société à l'adresse www.championiron.com/investisseurs/evenements-presentations. Une rediffusion téléphonique sera également disponible dans la semaine suivant l'appel conférence, en composant le +1-888-660-6345 en Amérique du Nord ou le +1-289-819-1450 outremer, puis en composant le code d'accès 56477#.
À propos de Champion Iron Limited
Champion est un producteur de minerai de fer de haute pureté, avec des activités au Canada et en Norvège. Par l'entremise de Minerai de fer Québec inc., Champion détient et exploite le complexe minier du Lac Bloom situé à l'extrémité sud de la Fosse du Labrador, à environ 13 kilomètres au nord de Fermont, Québec. La mine du Lac Bloom est une mine à ciel ouvert avec deux usines de concentration qui s'alimentent principalement en énergie hydroélectrique renouvelable, ayant une capacité nominale combinée de 15 millions de tonnes métriques humides par année. Les deux usines de concentration produisent des concentrés de minerai de fer de haute pureté avec de faibles teneurs en contaminants et ont prouvé leur capacité à produire un concentré de qualité supérieure destiné à la réduction directe. Le concentré de minerai de fer du Lac Bloom est expédié par rail jusqu'au port de chargement situé à Sept-Îles, Québec. Bénéficiant de l'une des ressources les plus pures au monde, Champion a achevé les travaux de construction du projet RDPB, conçu pour convertir jusqu'à la moitié de la capacité de la mine du Lac Bloom afin de produire du matériel de qualité réduction directe pour boulettes pouvant atteindre 69 % Fe, et poursuit actuellement la phase de mise en service et l'augmentation graduelle de sa production. Les produits de minerai de fer de haute pureté et à plus faible teneur en contaminants du Lac Bloom ont su se mériter une prime par rapport à l'indice P61 (anciennement, l'indice P62). Champion détient et exploite également Rana Gruber AS, un producteur norvégien de minerai de fer établi à Mo i Rana, Nordland. Avec une production continue depuis les années 1960, Rana Gruber produit environ 1,8 million de tonnes métriques sèches par année de concentré de minerai de fer d'hématite et de magnétite. Champion a livré ses concentrés de minerai de fer à l'échelle mondiale, notamment en Chine, au Japon, au Moyen-Orient, en Europe, en Corée du Sud, en Inde, en Asie du Sud-Est, en Afrique du Nord et au Canada. En plus de ses mines en production, Champion détient une participation de 51 % dans Kami Iron Mine Partnership, en partenariat avec Nippon Steel Corporation et Sojitz Corporation, par l'intermédiaire duquel le projet Kami est détenu. Situé à environ 21 kilomètres au sud-est du Lac Bloom, le projet bénéficie d'un accès aux infrastructures existantes. Champion détient également un portefeuille de projets d'exploration et de développement dans la Fosse du Labrador, incluant les propriétés Cluster II, situées à moins de 60 kilomètres au sud du Lac Bloom.
Mise en garde à propos des énoncés prospectifs
Le présent communiqué de presse contient de l'information et des énoncés qui peuvent constituer de l'« information prospective » ou « les énoncés prospectifs » aux termes de la législation sur les valeurs mobilières applicable (des « énoncés prospectifs »). Les énoncés prospectifs sont des énoncés qui ne sont pas des faits historiques et qui sont généralement, mais pas toujours, identifiés par l'emploi de termes comme « sera », « planifie », « s'attend à », « budgète », « est prévu », « estime », « continue », « prévoit », « projette », « prédit », « a l'intention de », « anticipe », « vise », « cible », « priorité », « positionne », « potentiel », ou « est d'avis », ou toute variation de ces termes, y compris leurs négatifs, ou des énoncés à l'effet que certaines actions et certains événements ou résultats « peuvent », « doivent », « pourraient », « devraient », « pourront » ou « devront » survenir, se réaliser ou être entrepris. Les énoncés prospectifs comportent des risques inhérents, des incertitudes et d'autres facteurs qui ne peuvent être prédits ni contrôlés par la Société. Les énoncés de mise en garde dans ce communiqué de presse s'appliquent à tous les énoncés prospectifs faits dans ce communiqué de presse.
Énoncés prospectifs spécifiques
Tous les énoncés autres que les énoncés de faits historiques compris dans le présent communiqué de presse, qui concernent des événements futurs, des développements ou des réalisations que Champion s'attend, anticipe ou est d'avis qu'ils pourraient se réaliser ou qu'ils se réaliseront, sont des énoncés prospectifs. Les énoncés prospectifs peuvent comprendre, entre autres choses, les attentes de la direction concernant : (i) la durée de vie de la mine du Lac Bloom, le plan d'investissement à long terme et les efforts visant à améliorer les taux de récupération, la production, les retombées économiques et autres, la capacité nominale et les occasions et avantages associés; (ii) le projet visant à valoriser le concentré de minerai de fer du Lac Bloom à un degré de pureté plus élevé et à convertir près de la moitié de la capacité minière accrue du Lac Bloom afin de produire du minerai de fer destiné à la réduction directe pour bouletage (le projet RDPB), la mise en service et la montée en cadence du projet RDPB, l'échéancier de réalisation anticipé du projet RDPB, y compris le calendrier prévisionnel pour le démarrage de la production commercialisable et l'atteinte de la pleine capacité de production, les dépenses résiduelles liées à l'achèvement du projet et le budget, les prix plus avantageux, les gains d'efficacité, les retombées économiques et autres, les discussions connexes avec des clients potentiels et les attentes à l'égard de ces derniers, les expéditions commerciales de minerai de fer prévues, incluant les cargaisons d'essai additionnelles prévues et les accords commerciaux pour les expéditions prévues au troisième trimestre de l'année financière 2027, la confirmation de la qualité du matériel RDPB et l'amélioration continue de la qualité moyenne des produits pour atteindre les spécifications ciblées dans le cadre du projet, la montée en cadence et l'atteinte de la pleine capacité de production du projet RDPB et l'impact de ces éléments sur la production, les ventes et les résultats financiers et les dates de ces différents éléments; (iii) l'acquisition de Rana Gruber, y compris les attentes concernant l'intégration de Rana Gruber, la production annuelle de concentré de minerai de fer de Rana Gruber et la capacité de Champion de réaliser les avantages anticipés de l'acquisition de Rana Gruber; (iv) le changement des méthodes de production de l'industrie sidérurgique, la croissance prévue de la demande mondiale pour des produits de minerai de fer à plus haute pureté et de fer préréduit (DRI), ainsi que le déficit de marché et les primes plus élevées qui s'en suivent, et la participation de la Société à ces efforts, sa contribution aux résultats et son positionnement en lien avec ces éléments, incluant la transition de l'offre de produits de la Société (y compris la production de produits RDPB de haute pureté), son expansion géographique, l'élargissement de ses marchés et de sa clientèle, les investissements connexes ainsi que les avantages attendus; (v) le maintien de la cadence des activités de déblaiement; (vi) les stratégies de gestion des stocks de minerai y compris le mélange des produits, le stockage à court terme et la réduction des stocks accumulés à Rana Gruber; (vii) la stratégie de gestion sécuritaire des résidus miniers de la Société, son plan d'investissement relatif aux résidus miniers et les programmes de réfection de l'équipement minier; (viii) le lien entre les prix pour le minerai de fer et les frais de transport maritime (y compris les perspectives quant à l'indice C3) et l'impact sur la Société; (ix) l'impact des fluctuations des prix pour le minerai de fer sur la Société et ses résultats financiers et la survenance de certains événements et leur impact sur les prix pour le minerai de fer et la demande pour des produits de minerai de fer de haute pureté; (x) les taux et les niveaux de production et de récupération, les caractéristiques du minerai et la performance de la Société ainsi que ses stratégies à cet égard et les programmes de travaux visant à optimiser les opérations, y compris l'optimisation du mélange de minerais; (xi) les prix des produits de la Société (y compris les prix provisoires); (xii) la production et les ventes anticipées de concentrés de minerai de fer de la Société, ses activités d'extraction minière et de transport du minerai et les coûts afférents; (xiii) les tendances observées entre les prix pour les concentrés de minerai de fer de la Société et l'indice P65; (xiv) les liquidités disponibles et la marge de manœuvre financière de la Société, y compris la priorisation des dépenses; (xv) l'avis de la Société concernant les mesures non conformes aux IFRS et les autres mesures financières, y compris l'utilité de ces mesures permettant aux investisseurs de mieux comprendre les résultats de la Société et sa capacité à générer des résultats d'exploitation, de comparer les résultats d'exploitation entre les périodes, d'évaluer le rendement des activités de la Société, d'évaluer ses liquidités et ses flux de trésorerie servant à financer ses besoins en fonds de roulement et ses dépenses d'investissement et d'assurer le service de la dette; (xvi) les initiatives stratégiques et de croissance et les opportunités de la Société en général, incluant le fait que de telles initiatives restent sujettes aux conditions du marché et aux capacités de financement, ainsi que leur potentiel d'optimisation des rendements pour les actionnaires, de création de valeur pour les parties prenantes et de renforcement du leadership de la Société dans l'industrie du minerai de fer de haute pureté; (xvii) l'impact du conflit au Moyen-Orient, des mesures découlant des politiques commerciales (incluant le cadre de sauvegarde de l'Union européenne et le mécanisme d'ajustement carbone aux frontières) et d'autres développements géopolitiques sur la demande et les prix pour le minerai de fer, les frais de transport maritime, le coût du carburant et les opérations de la Société; et (xviii) les initiatives d'optimisation opérationnelle et de réduction des coûts de la Société et les bénéfices qui devraient en découler, ainsi que la priorisation des programmes d'exploration.
Risques
Bien que la Société croie que les attentes exprimées dans ces énoncés prospectifs sont basées sur des hypothèses raisonnables, de tels énoncés prospectifs sont sujets à des risques, incertitudes et autres facteurs connus et inconnus, dont la plupart sont hors du contrôle de la Société, ce qui peut faire en sorte de faire varier substantiellement les résultats, performances ou accomplissements réels de la Société par rapport à ceux qui sont exprimés ou sous-entendus dans ces énoncés prospectifs. Des facteurs susceptibles de causer de telles variations entre les résultats réels et ceux indiqués dans les énoncés prospectifs incluent, sans s'y limiter : (i) les prix du minerai de fer; (ii) les prix de l'énergie; (iii) les coûts d'exploitation; (iv) les coûts de transport; (v) les incertitudes générales économiques, concurrentielles, politiques et sociales; (vi) la disponibilité continue de capital et de financement ainsi que l'état général de l'économie, du marché et des affaires; (vii) le moment et l'incertitude du passage de l'industrie sidérurgique vers de nouvelles méthodes de production, et l'impact sur la demande pour du matériel d'alimentation à haute pureté; (viii) des défaillances des usines, des équipements ou des processus à opérer comme prévu, y compris ceux des fournisseurs tiers ou des contreparties; (ix) des retards dans l'obtention d'approbations gouvernementales, des permis nécessaires ou dans l'achèvement d'activités de développement ou de construction; (x) les résultats des études de faisabilité; (xi) les changements aux hypothèses utilisées dans le cadre des études de faisabilité; (xii) les délais dans les projets, incluant les délais de mise en service et de montée en cadence du projet RDPB; (xiii) les événements géopolitiques, incluant le conflit au Moyen-Orient; (xiv) les effets de catastrophes et de crises de santé publique sur l'économie mondiale, le marché du minerai de fer et les opérations de Champion; (xv) la capacité de la Société à respecter les clauses restrictives en vertu de ses facilités de crédit, l'expiration de l'allègement temporaire des clauses restrictives et la capacité de la Société à obtenir d'autres modifications ou renonciations ou du financement supplémentaire à des conditions acceptables ou de toute autre façon; (xvi) la capacité du projet RDPB de produire avec constance du matériel répondant aux critères de qualité des clients et l'acceptation du matériel RDPB par les clients; (xvii) les politiques commerciales, les tarifs douaniers, les mesures de sauvegarde et les mécanismes d'ajustement carbone aux frontières; (xviii) les fluctuations des taux de change et l'efficacité des accords de couverture de la Société et le risque associé aux contreparties à ces derniers; et (xix) les risques liés à l'intégration de Rana Gruber et la réalisation des avantages anticipés de l'acquisition de Rana Gruber, ainsi que les facteurs traités dans la section sur les facteurs de risque du rapport de gestion de la Société pour l'exercice financier terminé le 31 mars 2026, disponible sous le profil de la Société auprès de l'ASX à l'adresse www.asx.com.au , sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à l'adresse www.championiron.com .
Rien ne garantit que l'un ou l'autre des énoncés prospectifs se révélera exact, les résultats réels et les événements futurs pouvant être sensiblement différents de ceux prévus dans les énoncés prospectifs. Les lecteurs ne doivent donc pas se fier outre mesure aux énoncés prospectifs.
Mises à jour ultérieures
Tous les énoncés prospectifs dans le présent communiqué de presse sont donnés en date des présentes ou à toute autre date spécifiée dans les énoncés prospectifs et sont fondés sur les jugements et les estimations de la direction de Champion et sur l'information dont la direction dispose à la date des présentes. Champion décline toute intention ou obligation de mettre à jour ou de réviser ses énoncés prospectifs, notamment à la lumière de nouveaux renseignements ou d'événements futurs, à moins que la législation ou les règles d'inscription de toute bourse à la cote de laquelle les titres de la Société sont inscrits ne l'y oblige, incluant les obligations d'information continue de la Société en vertu des règles d'inscription de l'ASX et des lois canadiennes sur les valeurs mobilières applicables. Si la Société publie une mise à jour de l'un ou de plusieurs des énoncés prospectifs, l'on ne doit pas supposer que d'autres mises à jour suivront à propos de ces énoncés prospectifs ou d'autres énoncés prospectifs. Champion met en garde le lecteur à l'effet que la liste de risques et d'incertitudes ci-dessus n'est pas exhaustive. Les lecteurs devraient considérer les facteurs ci-dessus avec attention, ainsi que les incertitudes qu'ils représentent et les risques qu'ils comportent.
Abréviations
Sauf indication contraire, tous les montants en dollars indiqués dans les présentes sont libellés en dollars canadiens. Les abréviations et définitions suivantes sont utilisées tout au long de ce communiqué de presse : $ US (dollar américain), $ CA (dollar canadien), Fe (fer), tmh (tonne métrique humide), tms (tonne métrique sèche), M (million), km (kilomètre), Lac Bloom ou mine du Lac Bloom (complexe minier du Lac Bloom), mine Rana Gruber (complexe minier de Mo i Rana), RD (réduction directe), RDPB (réduction directe pour bouletage), projet Kami (projet Kamistiatusset), indice C3 (indice Capesize C3 de la bourse baltique), indice P61 (indice Platts IODEX CFR Chine pour le minerai de fer à 61 % Fe), indice P62 (indice Platts IODEX CFR Chine pour le minerai de fer à 62 % Fe), indice P65 (indice Platts IODEX CFR Chine pour le minerai de fer à 65 % Fe), BAIIA (bénéfice avant les impôts sur le revenu et les impôts miniers, les charges financières nettes et l'amortissement) et BPA (bénéfice par action). L'utilisation de « Champion » ou de la « Société » fait référence à Champion Iron Limited et/ou à l'une ou plusieurs ou toutes ses filiales, selon le cas, et « MFQ » fait référence à Minerai de fer Québec inc. L'abréviation « IFRS » fait référence aux Normes internationales d'information financière telles qu'émises par l'International Accounting Standards Board.
Pour nous joindre
| Relations avec les investisseurs :Alexandre BuissièresDirecteur, Développement corporatif et marchés des capitaux[email protected] | Demandes des médias :Noémie Prégent-CharleboisVice-présidente, Communications, Affaires gouvernementales et Communautés[email protected] |
Pour plus de renseignements sur Champion Iron Limited, veuillez visiter notre site Web à l'adresse : www.championiron.com .
La diffusion du présent communiqué de presse a été autorisée par le conseil d'administration.
Les états financiers et le rapport de gestion connexe pour le trimestre et le semestre terminés le 30 septembre 2026 seront disponibles sous le profil de la Société auprès de l'ASX (www.asx.com.au ), sur SEDAR+ (www.sedarplus.ca ) et sur le site Web de la Société (www.championiron.com ) à compter du 29 octobre 2026.
| _________________________ | |
| 1 | Il s'agit d'une mesure financière ou d'un ratio non conforme aux IFRS, ou d'une autre mesure financière. La mesure n'est pas une mesure financière standardisée en vertu du cadre de présentation de l'information financière utilisé pour préparer les états financiers et pourrait ne pas être comparable à des mesures financières similaires utilisées par d'autres émetteurs. Se reporter à la section ci-dessous - Mesures non conformes aux IFRS et autres mesures financières, pour les définitions de ces mesures et un rapprochement avec la mesure conforme aux IFRS la plus directement comparable, le cas échéant. D'autres détails sur ces mesures non conformes aux IFRS et autres mesures financières ont été intégrés par renvoi et peuvent être consultés à la rubrique 20 du rapport de gestion de la Société pour le trimestre et le semestre terminés le 30 septembre 2026, disponible auprès de l'ASX à l'adresse www.asx.com.au, sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à la section Investisseurs à l'adresse www.championiron.com. |
| 2 | Se reporter à la rubrique 6 du rapport de gestion pour le trimestre et le semestre terminés le 30 septembre 2026, disponible auprès de l'ASX à l'adresse www.asx.com.au, sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à la section Investisseurs à l'adresse www.championiron.com. |
Mesures non conformes aux IFRS et autres mesures financières
La Société a inclus certaines mesures financières et ratios non conformes aux IFRS et d'autres mesures financières dans le présent communiqué de presse afin d'offrir aux investisseurs de l'information additionnelle leur permettant d'évaluer le rendement sous-jacent de la Société. Ces mesures sont principalement tirées des états financiers, mais n'ont pas de définition officielle en vertu des IFRS et pourraient donc ne pas être comparables à des mesures similaires présentées par d'autres sociétés. La direction est d'avis que ces mesures, en plus des mesures conventionnelles préparées conformément aux IFRS, permettent aux investisseurs de mieux comprendre les résultats des activités de la Société. Les mesures non conformes aux IFRS et les autres mesures financières ne devraient pas être considérées isolément ou comme substituts aux mesures de rendement préparées conformément aux IFRS. L'exclusion de certains éléments des mesures financières non conformes aux IFRS n'implique pas nécessairement que ces éléments ne sont pas récurrents. Les mesures de rendement par site minier devraient être analysées conjointement avec les informations sectorielles figurant à la note 25 des états financiers. À compter du T2 de l'exercice 2027, la Société a révisé la composition du résultat net ajusté (de la perte nette ajustée) et a introduit le BAIIA ajusté. Le résultat net ajusté (la perte nette ajustée) est calculé en ajustant le bénéfice net (la perte nette) pour exclure, le cas échéant, les coûts relatifs à l'acquisition, les coûts de démarrage, l'ajustement des stocks lié à la répartition du prix d'achat, les gains ou pertes à la cession d'investissements non courants, les radiations d'investissements non courants, les variations non réalisées de la juste valeur des instruments dérivés ainsi que les incidences fiscales connexes de ces éléments. Le BAIIA ajusté est calculé en ajustant le BAIIA pour exclure, le cas échéant, ces mêmes éléments.
La Société présente certaines de ses mesures non conformes aux IFRS et de ses autres mesures financières en dollars américains et en dollars canadiens, afin de faciliter la comparaison avec les mesures présentées par d'autres sociétés.
L'information financière non conforme aux IFRS présentée dans ce communiqué n'a pas été auditée ni examinée par les auditeurs externes de la Société.
Résultat net ajusté (perte nette ajustée) et BPA ajusté
| (en milliers de dollars, sauf les actions et les données par action) | T2 Exercice 2027 | T1 Exercice 2027 | T2 Exercice 2026 | |
| Résultat net (perte nette) | (48 355) | (41 528) | 56 794 | |
| Éléments de trésorerie | ||||
| Coûts de démarrage | 6 921 | 6 551 | -- | |
| Ajustement des stocks lié à la répartition du prix d'achat | 4 832 | 2 865 | -- | |
| Coûts relatifs à l'acquisition | -- | 3 618 | 13 | |
| Éléments hors trésorerie | ||||
| Variation latente de la juste valeur d'instruments dérivés | 7 856 | 32 517 | -- | |
| (28 746) | 4 023 | 56 807 | ||
| Incidences fiscales des ajustements énumérés ci-dessus | (5 518) | (9 984) | -- | |
| Résultat net ajusté (perte nette ajustée) | (34 264) | (5 961) | 56 807 | |
| (en milliers) | ||||
| Nombre moyen pondéré d'actions ordinaires en circulation - de base | 560 047 | 557 102 | 533 251 | |
| BPA ajusté (en dollars) | (0.06) | (0.01) | 0.11 |
BAIIA et marge BAIIA
| (en milliers de dollars) | T2 Exercice 2027 | T1 Exercice 2027 | T2 Exercice 2026 | |
| Bénéfice (perte) avant les impôts sur le revenu et les impôts miniers | (71 019) | (50 312) | 104 072 | |
| Charges financières nettes | 15 485 | 35 861 | 25 643 | |
| Amortissement | 59 190 | 47 241 | 45 108 | |
| BAIIA | 3 656 | 32 790 | 174 823 | |
| Produits | 403 932 | 356 876 | 492 890 | |
| Marge BAIIA | 1 % | 9 % | 35 % | |
| Éléments de trésorerie | ||||
| Coûts de démarrage | 6 921 | 6 551 | -- | |
| Ajustement des stocks lié à la répartition du prix d'achat | 4 832 | 2 865 | -- | |
| Coûts relatifs à l'acquisition | -- | 3 618 | 13 | |
| Éléments hors trésorerie | ||||
| Variation latente de la juste valeur d'instruments dérivés | 7 856 | 32 517 | -- | |
| BAIIA ajusté | 23 265 | 78 341 | 174 836 |
Liquidités disponibles
| Au 30 septembre | Au 30 juin | |||
| (en milliers de dollars) | 2026 | 2026 | ||
| Trésorerie | 214 357 | 198 621 | ||
| Montants disponibles en vertu des facilités de crédit | 404 088 | 454 516 | ||
| Liquidités disponibles | 618 445 | 653 137 |
Coût comptant C1
| T2 Exercice 2027 | T1 Exercice 2027 | T2 Exercice 2026 | ||
| Concentrés de minerai de fer vendus (tms) | 4 494 100 | 3 339 000 | 3 850 900 | |
| (en milliers de dollars, sauf les montants par tms) | ||||
| Coût des ventes | 384 118 | 288 751 | 293 398 | |
| Moins : Ajustement des stocks lié à la répartition du prix d'achat | (4 832) | (2 865) | -- | |
| Moins : Coûts de démarrage | (6 921) | (6 551) | -- | |
| 372 365 | 279 335 | 293 398 | ||
| Coût comptant C1 (par tms vendue) | 82,9 | 83,7 | 76,2 |
Coût de maintien tout inclus
| T2 Exercice 2027 | T1 Exercice 2027 | T2 Exercice 2026 | ||
| Concentrés de minerai de fer vendus (tms) | 4 494 100 | 3 339 000 | 3 850 900 | |
| (en milliers de dollars, sauf les montants par tms) | ||||
| Coût des ventes | 384 118 | 288 751 | 293 398 | |
| Moins : Ajustement des stocks lié à la répartition du prix d'achat | (4 832) | (2 865) | -- | |
| Moins : Coûts de démarrage | (6 921) | (6 551) | -- | |
| Dépenses en immobilisations de maintien | 53 620 | 78 204 | 69 910 | |
| Dépenses générales et administratives | 14 114 | 14 185 | 9 894 | |
| 440 099 | 371 724 | 373 202 | ||
| CMTI (par tms vendue) | 97,9 | 111,3 | 96,9 |
Marge d'exploitation et marge bénéficiaire
| T2 Exercice 2027 | T1 Exercice 2027 | T2 Exercice 2026 | ||
| Concentrés de minerai de fer vendus (tms) | 4 494 100 | 3 339 000 | 3 850 900 | |
| (en milliers de dollars, sauf les montants par tms) | ||||
| Produits | 403 932 | 356 876 | 492 890 | |
| Prix de vente moyen réalisé net (par tms vendue) | 89,9 | 106,9 | 128,0 | |
| CMTI (par tms vendue) | 97,9 | 111,3 | 96,9 | |
| Marge d'exploitation (par tms vendue) | (8,0) | (4,4) | 31,1 | |
| Marge bénéficiaire | (9 %) | (4 %) | 24 % |
Prix de vente moyen réalisé brut par tms vendue
| T2 Exercice 2027 | T1 Exercice 2027 | T2 Exercice 2026 | |
| Concentrés de minerai de fer vendus (tms) | 4 494 100 | 3 339 000 | 3 850 900 |
| (en milliers de dollars, sauf les montants par tms) | |||
| Produits | 403 932 | 356 876 | 492 890 |
| Ajustements de prix provisoires | 6 493 | 6 205 | (40 935) |
| Frais de transport maritime et autres coûts | 253 683 | 166 982 | 154 436 |
| Produits bruts | 664 108 | 530 063 | 606 391 |
| Prix de vente moyen réalisé brut (par tms vendue) | 147,8 | 158,7 | 157,5 |
Coût comptant C1 et CMTI par site minier
| T2 Exercice 2027 | T1 Exercice 2027 | T2 Exercice 2026 | |||||||
| Lac Bloom | Rana Gruber | Consolidé | Lac Bloom | Rana Gruber | Consolidé | Lac Bloom | Rana Gruber | Consolidé | |
| (en milliers) | |||||||||
| Concentrés de minerai de fer vendus (tms) | 3 907 | 587 | 4 494 | 3 129 | 210 | 3 339 | 3 851 | -- | 3 851 |
| Concentrés de minerai de fer produits (tms) | 3 222 | 508 | 3 730 | 3 438 | 365 | 3 802 | 3 442 | -- | 3 442 |
| (en milliers de dollars, sauf les montants par tonne) | |||||||||
| Coûts d'extraction minière et de traitement du minerai | 194 950 | 34 471 | 229 421 | 187 287 | 31 237 | 218 524 | 182 103 | -- | 182 103 |
| Variation des stocks de concentrés de minerai de fer | 33 324 | 14 640 | 47 964 | (22 028) | (13 450) | (35 478) | 17 410 | -- | 17 410 |
| Coûts de transport terrestre et de manutention portuaire | 94 036 | 944 | 94 980 | 95 694 | 595 | 96 289 | 93 885 | -- | 93 885 |
| Ajustement des stocks lié à la répartition du prix d'achat | -- | 4 832 | 4 832 | -- | 2 865 | 2 865 | -- | -- | -- |
| Coûts de démarrage | 6 921 | -- | 6 921 | 6 551 | -- | 6 551 | -- | -- | -- |
| Coût des ventes (en dollars) | 329 231 | 54 887 | 384 118 | 267 504 | 21 247 | 288 751 | 293 398 | -- | 293 398 |
| Moins : Ajustement des stocks lié à la répartition du prix d'achat | -- | (4 832) | (4 832) | -- | (2 865) | (2 865) | -- | -- | -- |
| Moins : Coûts de démarrage | (6 921) | -- | (6 921) | (6 551) | -- | (6 551) | -- | -- | -- |
| Coût comptant C1 (en dollars) | 322 310 | 50 055 | 372 365 | 260 953 | 18 382 | 279 335 | 293 398 | -- | 293 398 |
| Plus : Dépenses en immobilisations de maintien | 46 679 | 6 941 | 53 620 | 65 696 | 12 508 | 78 204 | 69 910 | -- | 69 910 |
| Plus : Dépenses générales et administratives | -- | -- | 14 114 | -- | -- | 14 185 | -- | -- | 9 894 |
| CMTI (en dollars) | 368 989 | 56 996 | 440 099 | 326 649 | 30 890 | 371 724 | 363 308 | -- | 373 202 |
| Coûts d'extraction minière et de traitement du minerai (par tms produite)1 | 60,5 | 67,9 | 61,5 | 54,5 | 85,7 | 57,5 | 52,9 | -- | 52,9 |
| Coûts de transport terrestre et de manutention portuaire (par tms vendue)1 | 24,1 | 1,6 | 21,1 | 30,6 | 2,8 | 28,8 | 24,4 | -- | 24,4 |
| Coût comptant C1 (par tms vendue)1 | 82,5 | 85,3 | 82,9 | 83,4 | 87,5 | 83,7 | 76,2 | -- | 76,2 |
| CMTI (par tms vendue)1 | 94,4 | 97,1 | 97,9 | 104,4 | 147,0 | 111,3 | 94,3 | -- | 96,9 |
SOURCE Champion Iron Limited

[Champion Iron s'engage dans des projets performants,
à faible impact environnemental.
---------------------------------------------------------------------------------------
\
Investissez dans l'avenir brillant des mines\
‘Voir notre plus récent rapport d'activité»
](https://www.championiron.com/investisseurs/telecharger-le-guide-de-linvestisseur/?lang=fr)
Inscrivez-vous à l’infolettre Champion Iron
Voir tous les prix du marché »
Voir tous les prix du marché »
Siège social
Montréal
1155 René-Lévesque West
Suite 3300
Montréal QC H3B 3X7
Tél.: +1 514 316 4858
Téléc.: +1 514 871 8270
Australie
91, Evans Street
Rozelle NSW 2039
Tél.: +61 2 98107816
Téléc.: +61 2 86555017
Toronto
20, Adelaide Street East
Suite 200
Toronto ON M5C 2T6
Tél.: +1 416 866-2200
Sans frais (Amérique du Nord) :
+1 877 448-2201
Téléc.: +1 416 361-1333
×
(opens in a new window)
Press Releases
Consult our newsletters (PDF) »
CHAMPION IRON REPORTS ITS FY2027 SECOND QUARTER RESULTS
-
Quarterly production of 3.9M wmt, record consolidated sales of 4.5M dmt, revenues of $404M and adjusted EBITDA of $23M1
-
Inaugural commercial shipment of DR quality iron ore from the DRPF project completed
-
Secured additional DRPF test-cargoes and commercial agreements for shipments scheduled for Q3 FY27
MONTRÉAL, Oct. 28, 2026 /CNW/ -- SYDNEY, October 29, 2026 - Champion Iron Limited (ASX: CIA) (TSX: CIA) (OTCQX: CIAFF) ("Champion" or the "Company") reports its operational and financial results for its financial second quarter ended September 30, 2026.
Champion's CEO, Mr. David Cataford, said, "As we operate in challenging conditions and heightened volatility, we remain privileged to benefit from our teams' commitment, the support of our host communities, and a strong network of financial partners who recognize the quality of our assets and the long-term value of our strategy. The completion of an initial sale of DRPF material marks an important milestone for us, with additional commercial shipments scheduled for the coming quarter reflecting growing market interest in this product and the potential to expand our reach to customers across shorter freight routes. Having completed a significant multi-year investment cycle at Bloom Lake, our priority is now to optimize our assets, strengthen our balance sheet and pursue cost-reduction initiatives."
Conference Call Details
Champion will host a conference call and webcast on October 29, 2026, at 9:00 AM (Montréal time) / October 30, 2026 at 12:00 AM (Sydney time) to discuss the results of its financial second quarter ended September 30, 2026. The conference call details are set out at the end of this press release.
Note to Readers
Following the acquisition of Rana Gruber AS ("Rana Gruber") on April 10, 2026 (the "Rana Gruber Acquisition"), to maximize transparency for stakeholders regarding the performance of Bloom Lake and Rana Gruber, operational metrics and selected financial metrics are presented separately for Bloom Lake and Rana Gruber in Section 2 of this press release. It is also important to note that, following the acquisition, Champion aligned Rana Gruber's financial information with its reporting practices. Accordingly, caution should be exercised when comparing current-period results with Rana Gruber's historical results reported prior to the completion of the acquisition, as well as with Champion's previous results. Additional details about the Rana Gruber Acquisition are provided in the unaudited condensed consolidated financial statements for the three and six-month periods ended September 30, 2026 (the "Financial Statements") and associated management's discussion and analysis of the Company (the "MD&A"), available on the ASX at www.asx.com.au , SEDAR+ at www.sedarplus.ca and on the Company's website at www.championiron.com .
1. Quarterly Highlights
Operations and Sustainability
- No serious workplace injuries and no significant environmental incidents were reported during the three-month period ended September 30, 2026;
- Quarterly production totalled 3.9 million wmt of high-purity iron ore concentrates for the three-month period ended September 30, 2026, up 9% over the same prior-year period, attributable to the contribution from Rana Gruber (0.5 million wmt), partially offset by the lower production volumes at Bloom Lake (3.3 million wmt) which were impacted by inefficiencies created by the DRPF commissioning activities, consistent with management's expectations for the commissioning period;
- Record consolidated quarterly sales of 4.5 million dmt of high-purity iron ore concentrates for the three-month period ended September 30, 2026, an increase of 17% over the same prior-year period, driven by strong sales volumes at Bloom Lake (3.9 million dmt) and Rana Gruber (0.6 million dmt), resulting in lower inventory levels across both operations; and
- Completed the inaugural commercial shipment of DRPF product during the quarter, secured additional test-cargoes and commercial agreements for shipments scheduled for the third quarter of the 2027 financial year and continued to advance discussions with prospective customers. While DRPF production volumes remained comparable quarter-over-quarter, average product quality continued to improve towards the project's target specifications.
Financial Results
- Financial results for the quarter continued to be impacted by lower iron ore indexes, higher ocean freight rates and elevated fuel prices, partly resulting from the conflict in the Middle East, as well as DRPF start-up costs;
- Gross average realized selling price of US$105.5/dmt1 (C$147.8/dmt1), compared to the P65 index average price of US$112.8/dmt in the period;
- Net average realized selling price of $89.9/dmt1, a decrease of 16% quarter-over-quarter and 30% year-over-year;
- C1 cash cost for the iron ore concentrates loaded onto vessels totalled $82.9/dmt1 (US$59.2/dmt)2, up from $76.2/dmt1 (US$55.3/dmt)2 for the same period in 2025. C1 cash cost for the period continued to be affected by elevated fuel prices impacting mining operations, the transition toward DRPF production and its higher processing costs, and lower production volumes at Bloom Lake over which to amortize fixed costs;
- Net loss of $48.4 million (adjusted net loss of $34.3 million1), representing a $0.09 loss per share (adjusted loss per share of $0.061), compared to a net loss of $41.5 million (adjusted net loss of $6.0 million1) with a $0.07 loss per share (adjusted loss per share of $0.011) in the previous quarter, and net income of $56.8 million (adjusted net income of $56.8 million1) with EPS of $0.11 (adjusted EPS of $0.111) in the same prior-year period. Net loss includes several items that are excluded from adjusted net loss, including DRPF start-up costs of $6.9 million, inventory valuation adjustments of $4.8 million related to the acquisition of Rana Gruber and $7.9 million unrealized fair value losses on derivative instruments;
- EBITDA of $3.7 million1 (adjusted EBITDA of $23.3 million1) for the three-month period ended September 30, 2026, down from $174.8 million1 (adjusted EBITDA of $174.8 million1) for the same period in 2025;
- Cash balance, excluding the unused portion of the initial cash contributions from Nippon Steel Corporation ("Nippon Steel") and Sojitz Corporation ("Sojitz", and collectively with Nippon Steel, the "Partners") that are held by the Kami Iron Mine Partnership (the "Kami Partnership"), totalled $214.4 million as at September 30, 2026, an increase of $15.7 million since June 30, 2026. This primarily reflects robust sales volumes, including the destocking of iron ore inventories, and strong cash collections, partially offset by sustaining capital expenditures; and
- Available liquidity of $618.4 million1 as at September 30, 2026, compared to $653.1 million1 as at June 30, 2026.
2. Financial and Operating Performance
| Q2 FY27 | Q1 FY27 | Q/Q Change | Q2 FY26 | Y/Y Change | |||
| Consolidated Operation Data | |||||||
| Iron ore concentrates produced (wmt) | 3,872,500 | 3,939,400 | (2) % | 3,551,600 | 9 % | ||
| Iron ore concentrates sold (dmt) | 4,494,100 | 3,339,000 | 35 % | 3,850,900 | 17 % | ||
| Consolidated Financial Data (in thousands of dollars) | |||||||
| Revenues | 403,932 | 356,876 | 13 % | 492,890 | (18) % | ||
| Cost of sales | 384,118 | 288,751 | 33 % | 293,398 | 31 % | ||
| Net income (loss) | (48,355) | (41,528) | 16 % | 56,794 | (185) % | ||
| Adjusted net income (loss)1 | (34,264) | (5,961) | 475 % | 56,807 | (160) % | ||
| EBITDA1 | 3,656 | 32,790 | (89) % | 174,823 | (98) % | ||
| Adjusted EBITDA1 | 23,265 | 78,341 | (70) % | 174,836 | (87) % | ||
| Consolidated Statistics (in dollars per dmt sold) | |||||||
| Gross average realized selling price1 | 147.8 | 158.7 | (7) % | 157.5 | (6) % | ||
| Net average realized selling price1 | 89.9 | 106.9 | (16) % | 128.0 | (30) % | ||
| C1 cash cost1 | 82.9 | 83.7 | (1) % | 76.2 | 9 % | ||
| AISC1 | 97.9 | 111.3 | (12) % | 96.9 | 1 % | ||
| Cash operating margin1 | (8.0) | (4.4) | 82 % | 31.1 | (126) % |
A. Consolidated Revenues
Revenues totalled $403.9 million for the three-month period ended September 30, 2026, down $89.0 million from $492.9 million in the same prior-year period, despite the contribution of $54.3 million from Rana Gruber's operations. The decrease in Bloom Lake revenues was attributable to lower net realized selling prices, reflecting elevated C3 index and lower iron ore indexes, as well as less favourable provisional pricing adjustments, compared to the same period in 2025.
For the three-month period ended September 30, 2026, the gross average realized selling price of US$105.5/dmt1 was below the P65 index average price of US$112.8/dmt. The 3.4 million dmt of iron ore sold that remained subject to pricing adjustments as at September 30, 2026, were evaluated using a weighted average forward selling price of US$103.4/dmt, which was lower than the P65 index average price for the period. The discount to the P65 index also reflected continued exposure to short-term and spot market sales at discounted pricing during Bloom Lake's transition to higher-purity DR quality iron ore products. This was partially offset by Bloom Lake's concentrate sales priced using backward-looking mechanisms, where applicable index prices were above the P65 index average price of the period.
Freight and other costs totalled US$40.4/dmt during the three-month period ended September 30, 2026, representing a 39% increase compared to US$29.1/dmt in the same prior-year period. While the C3 index increased significantly during the quarter, the Company's freight and other costs rose at a slower pace, reflecting its vessel booking strategy and the benefit of favourable freight rates secured under fixed-price contracts for a portion of the sales volumes, at below prevailing market levels. The rise in the C3 index, driven in part by the ongoing conflict in the Middle East, is expected to continue impacting Champion's net revenues in future months, as most vessels are booked three to five weeks prior to the desired laycan period.
During the three-month period ended September 30, 2026, an average final price of US$108.1/dmt was established for the 2.1 million dmt of iron ore concentrates sold that were subject to provisional pricing adjustments as at June 30, 2026, which were previously evaluated using an average estimated price of US$110.4/dmt. Accordingly, negative provisional pricing adjustments of $6.5 million (US$4.8 million) were recorded on tonnes subject to provisional pricing as at June 30, 2026, representing a negative impact of US$1.1/dmt for the 4.5 million dmt sold during the quarter.
After taking into account sea freight and other costs of US$40.4/dmt and the negative provisional pricing adjustments of US$1.1/dmt, the Company obtained a net average realized selling price of US$64.0/dmt2 (C$89.9/dmt1) for its high-purity iron ore concentrates shipped during the three-month period ended September 30, 2026.
B. Bloom Lake Mine Results
Bloom Lake conducts scheduled maintenance on both plants in the second and fourth financial quarters, which may create significant quarter-over-quarter variances in production output and mining and processing costs.
| Q2 FY27 | Q1 FY27 | Q/Q Change | Q2 FY26 | Y/Y Change | |||
| Mine Operating Data | |||||||
| Iron ore concentrates produced (wmt) | 3,323,700 | 3,547,200 | (6) % | 3,551,600 | (6) % | ||
| Iron ore concentrates sold (dmt) | 3,907,100 | 3,128,800 | 25 % | 3,850,900 | 1 % | ||
| Stripping ratio | 1.21 | 1.04 | 16 % | 1.29 | (6) % | ||
| Head grade Fe (%) | 30.3 | 29.5 | 3 % | 29.6 | 2 % | ||
| Fe recovery (%) | 78.2 | 79.0 | (1) % | 79.6 | (2) % | ||
| Weighted average products Fe (%) | 66.7 | 66.5 | -- % | 66.5 | -- % | ||
| Mine Selected Financial Data (in thousands of dollars) | |||||||
| Revenues | 349,624 | 332,980 | 5 % | 492,890 | (29) % | ||
| Cost of sales | 329,231 | 267,504 | 23 % | 293,398 | 12 % | ||
| Gross profit (loss) | (27,300) | 27,408 | (200) % | 155,012 | (118) % | ||
| Mine Selected Statistics (in dollars per dmt sold) | |||||||
| Net average realized selling price1 | 89.5 | 106.4 | (16) % | 128.0 | (30) % | ||
| C1 cash cost1 | 82.5 | 83.4 | (1) % | 76.2 | 8 % | ||
| AISC1 | 94.4 | 104.4 | (10) % | 94.3 | -- % |
i. Operating Performance
Bloom Lake produced 3.3 million wmt of high-purity iron ore concentrates during the three-month period ended September 30, 2026, a decrease of 6% compared to 3.6 million wmt produced during the same period in 2025, reflecting inefficiencies from the ongoing commissioning of the DRPF project. Quarterly production included 0.6 million wmt of concentrate produced through the DRPF project, comparable quarter-over-quarter, with average product quality progressively improving towards targeted purity specifications in accordance with the commissioning process. As a result, the weighted average product grade increased to 66.7% Fe from 66.5% Fe year-over-year. During the three-month period ended September 30, 2026, the Fe recovery rate decreased to 78.2% from 79.6% for the same period in 2025, primarily attributable to higher iron ore losses to tailings associated with DRPF operations.
Iron ore concentrate sales volumes exceeded production, with 3.9 million dmt sold during the three-month period ended September 30, 2026, as Bloom Lake recovered from shipment delays experienced in the previous quarter caused by the DRPF project commissioning activities. As a result, inventories of iron ore concentrates at Bloom Lake and at the Port of Sept-Îles decreased to 1.0 million wmt as at September 30, 2026, compared to 1.7 million wmt as at June 30, 2026. As Bloom Lake advances the commissioning of the DRPF project, it continues to optimize its inventory management strategies to manage different iron ore concentrate qualities and enhance production and sales logistics.
During the three-month period ended September 30, 2026, Bloom Lake mined and hauled 21.7 million wmt of waste and ore, compared to 22.9 million wmt in the same prior-year period. The stripping ratio for the three-month period ended September 30, 2026, was 1.21, consistent with its LoM plan, compared to a 1.29 ratio recorded in the same prior-year period.
ii. Financial Performance
The cost of sales associated with Bloom Lake operations totalled $329.2 million, compared to $293.4 million for the same period in 2025. For the three-month period ended September 30, 2026, mining and processing costs totalled $60.5/dmt produced1, representing a 14% increase, compared to $52.9/dmt produced1 in the same prior-year period, primarily attributable to higher fuel prices arising from the conflict in the Middle East, the transition toward DRPF production and its higher processing costs, and lower production volumes over which to amortize fixed costs. Land transportation and port handling costs include both fixed and variable components and are significantly influenced by the volume hauled from Fermont to the Port of Sept-Îles. For the three-month period ended September 30, 2026, these costs totalled $24.1/dmt sold1, consistent with the prior-year period, due to similar sales volumes. In addition, cost of sales was impacted by changes in iron ore concentrates inventory valuation, which incorporate mining and processing costs from the previous quarter, along with variations in production and sales volumes. Consequently, Bloom Lake C1 cash cost totalled $82.5/dmt1, compared to $76.2/dmt1 for the same period in 2025. C1 cash cost excludes DRPF start-up costs, which mainly include abnormal operational costs incurred as the facility progresses toward commercial production.
Gross loss totalled $27.3 million during the three-month period ended September 30, 2026, compared to gross profit of $155.0 million for the same period in 2025. This gross loss was mainly attributable to lower net realized selling prices combined with higher cost of sales, resulting in lower gross margins on each tonne sold.
AISC totalled $94.4/dmt1 for the three-month period ended September 30, 2026, in line with the same prior-year period as higher cash costs were offset by lower sustaining capital expenditures, reflecting the phasing of infrastructure-related investments and the optimization of capital allocation in response to current market conditions.
C. Rana Gruber Mine Results
Comparisons of unit costs across Champion's operating segments should be interpreted in the context of distinct production methods, processing operations and logistics infrastructure associated with each site. Rana Gruber's Q1 FY27 results reflect the period from the acquisition date of April 10, 2026 to June 30, 2026, and therefore represent less than a full quarter of operations; quarter-over-quarter comparisons should be read in that context.
At Bloom Lake, the distance between the mine site and the Port of Sept-Îles results in transportation and handling costs being incurred primarily during the haulage of iron ore concentrates and are therefore categorized as land transportation and port handling costs.
At Rana Gruber, the proximity of the processing facility to the port means that a greater proportion of handling costs are incurred prior to the production of iron ore concentrates and are included in mining and processing costs, while land transportation costs are limited due to the significantly shorter rail haulage distance, compared to Bloom Lake.
| Q2 FY27 | Q1 FY27 | Q/Q Change | ||
| Mine Operating Data | ||||
| Iron ore concentrate produced (wmt) | 548,800 | 392,200 | 40 % | |
| Iron ore concentrate sold (dmt) | 587,000 | 210,200 | 179 % | |
| Open-pit stripping ratio | 1.59 | 2.00 | (21) % | |
| Head grade Fe (%) | 32.8 | 31.7 | 3 % | |
| Fe recovery (%) | 76.3 | 75.3 | 1 % | |
| Weighted average products Fe (%) | 65.0 | 65.2 | -- % | |
| Mine Selected Financial Data (in thousands of dollars) | ||||
| Revenues | 54,308 | 23,896 | 127 % | |
| Cost of sales | 54,887 | 21,247 | 158 % | |
| Gross loss | (11,502) | (5,989) | 92 % | |
| Mine Selected Statistics (in dollars per dmt sold) | ||||
| Net average realized selling price1 | 92.5 | 113.7 | (19) % | |
| C1 cash cost1 | 85.3 | 87.5 | (3) % | |
| AISC1 | 97.1 | 147.0 | (34) % |
i. Operating Performance
Rana Gruber produced 0.5 million wmt of high-purity iron ore concentrates at a weighted average grade of 65.0% Fe during the three-month period ended September 30, 2026. Production during the quarter benefited from higher mill throughput of 1.3 million wmt following the annual maintenance shutdown completed in June 2026, together with a higher head grade of 32.8% Fe and Fe recovery of 76.3%.
Iron ore concentrates sales totalled 0.6 million dmt during the quarter, exceeding production levels primarily due to the timing of shipments and the reduction of magnetite inventories. As a result, inventories of iron ore concentrates decreased to 0.3 million wmt as at September 30, 2026, from 0.4 million wmt as at June 30, 2026.
ii. Financial Performance
During the three-month period ended September 30, 2026, cost of sales totalled $54.9 million, while C1 cash cost amounted to $85.3/dmt sold1, lower than the previous quarter. Cost of sales for the period included mining and processing costs of $34.5 million, land transportation and port handling costs of $0.9 million, a $14.6 million change in iron ore concentrates inventories and a purchase price allocation inventory adjustment of $4.8 million. Mining and processing costs totalled $67.9/dmt produced¹ and benefited from higher production levels, improved control over consumable usage and ongoing cost optimization efforts. These favourable impacts were partially offset by persistently higher diesel and explosives prices during the quarter. Land transportation and port handling costs totalled $1.6/dmt sold1 and benefited from a one-time reimbursement resulting from the resolution of historical public railway fee claims. C1 cash cost excludes inventory adjustments made as part of the purchase price allocation, as it reflects the fair value step-up of inventories recognized as part of the Rana Gruber Acquisition and is not representative of the underlying operating cost of producing and selling iron ore concentrates.
Gross loss totalled $11.5 million during the three-month period ended September 30, 2026, as the positive impact of higher sales volumes was more than offset by lower realized selling prices resulting from downward pressure on iron ore index prices and higher transportation costs driven by continued increases in fuel rates. Gross loss was also impacted by the purchase price allocation inventory adjustment of $4.8 million.
AISC totalled $97.1/dmt1 for the three-month period ended September 30, 2026, significantly lower than in the previous quarter, mainly attributable to lower sustaining capital expenditures and the positive impact of higher sales volumes.
D. Net Income (Loss), EBITDA & Adjusted EBITDA
For the three-month period ended September 30, 2026, the Company generated a net loss of $48.4 million (loss per share of $0.09), compared to net income of $56.8 million (EPS of $0.11) for the same prior-year period. These decreases in net results were mainly attributable to a lower gross profit, partially offset by lower income and mining taxes, a lower foreign exchange loss on net monetary liabilities denominated in foreign currencies, as well as a share-based payment decrease. The lower gross result for the three-month period ended September 30, 2026, included DRPF start-up costs of $6.9 million and inventory valuation adjustments in relation to the Rana Gruber Acquisition of $4.8 million.
For the three-month period ended September 30, 2026, the Company generated EBITDA of $3.7 million1, representing an EBITDA margin of 1%1, compared to $174.8 million1, representing an EBITDA margin of 35%1, for the same period in 2025. Lower EBITDA and EBITDA margins were mainly driven by lower net realized selling prices and higher cash costs, partially offset by higher sales volumes.
For the three-month period ended September 30, 2026, adjusted EBITDA totalled $23.3 million1, compared to $174.8 million1, for the same prior-year period.
E. All-in Sustaining Cost & Cash Operating Margin
During the three-month period ended September 30, 2026, the Company realized an AISC of $97.9/dmt1, compared to $96.9/dmt1 in the same period in 2025, as lower sustaining capital expenditures at Bloom Lake combined with higher volumes of iron ore concentrates sold, partially offset the rise in cash costs.
The Company generated a negative cash operating margin of $8.0/dmt1 for each tonne of high-purity iron ore concentrate sold during the three-month period ended September 30, 2026, compared to a positive cash operating margin of $31.1/dmt1 for the same prior-year period. This decrease was mainly due to a lower net average realized selling price with an AISC remaining relatively stable year-over-year.
3. Exploration Activities
During the three and six-month periods ended September 30, 2026, the Company maintained all its properties in good standing and did not enter into any farm-in or farm-out arrangements. During the three and six-month periods ended September 30, 2026, $3.8 million and $5.7 million in exploration and evaluation expenditures were incurred, respectively, compared to $6.4 million and $15.2 million, respectively, for the same prior-year periods. The lower expenditures year-over-year reflected the transfer of the Kami properties to the Kami Partnership and the Partners' acquisition of the aggregate 49% interest in the Kami Partnership in September 2025. The decrease also reflects ongoing cost reduction initiatives across the organization, as well as the prioritization of certain exploration programs given the current market conditions.
Exploration and evaluation expenditures were incurred and carried out in Canada in the provinces of Québec and Newfoundland and Labrador. Details on exploration projects, including maps, are available on the Company's website at www.championiron.com under the Operations & Projects section. The information on the Company's website is not incorporated by reference into this press release.
4. Cash Flows -- Purchase of Property, Plant and Equipment
| Three Months Ended | Six Months Ended | |||||||
| September 30, | September 30, | |||||||
| (in thousands of dollars) | 2026 | 2025 | 2026 | 2025 | ||||
| Tailings and water infrastructure | 14,823 | 23,481 | 35,644 | 38,247 | ||||
| Stripping and mining activities | 24,583 | 18,739 | 46,219 | 31,714 | ||||
| Tunnelling and underground infrastructure | 4,712 | -- | 8,494 | -- | ||||
| Other sustaining capital expenditures | 9,502 | 27,690 | 41,467 | 42,190 | ||||
| Sustaining Capital Expenditures | 53,620 | 69,910 | 131,824 | 112,151 | ||||
| DRPF project | 3,244 | 20,614 | 17,462 | 68,074 | ||||
| Other capital development expenditures | 25,754 | 22,675 | 34,253 | 38,349 | ||||
| Purchase of Property, Plant and Equipment as per Cash Flows | 82,618 | 113,199 | 183,539 | 218,574 |
Sustaining Capital Expenditures
The tailings-related investments for the three and six-month periods ended September 30, 2026, were consistent with QIO's long-term plan to support LoM operations. Champion continues to prioritize tailings safety through ongoing infrastructure monitoring and inspections, while advancing its long-term investment plan at Bloom Lake. Tailings-related construction activities are typically undertaken between May and November, when weather conditions are more favourable at Bloom Lake.
Stripping and mining activities for the three and six-month periods ended September 30, 2026, included $15.8 million and $33.6 million, respectively, of mine development costs, comprising topographic and pre-cut drilling work, the details of which are contained in the Company's mine plan ($7.3 million and $15.1 million, respectively, for the same periods in 2025). During the three and six-month periods ended September 30, 2026, stripping and mining activities also included $8.8 million and $12.7 million, respectively, of capitalized stripping costs ($11.4 million and $16.6 million, respectively, for the same periods in 2025).
Tunnelling and underground infrastructure expenditures are related to Rana Gruber and included ramp access and other underground infrastructure works.
Other sustaining capital investments for the three and six-month periods ended September 30, 2026, included expenditures related to mining equipment rebuild programs that are aligned with the Company's long-term investment strategy to support growth initiatives across the LoM.
DRPF Project
During the three and six-month periods ended September 30, 2026, the Company spent $3.2 million and $17.5 million, respectively, in capital expenditures related to the DRPF project ($20.6 million and $68.1 million, respectively, for the same prior-year periods). The decrease primarily reflects the substantial completion of construction activities, with year-to-date investments mainly consisting of commissioning and ramp-up activities. Cumulative investments totalled $497.0 million as at September 30, 2026.
Other Capital Development Expenditures
During the three and six-month periods ended September 30, 2026, other capital development expenditures totalled $25.8 million and $34.3 million, respectively ($22.7 million and $38.3 million, respectively, for the same periods in 2025) and are detailed as follows:
| Three Months Ended | Six Months Ended | ||||||
| September 30, | September 30, | ||||||
| (in thousands of dollars) | 2026 | 2025 | 2026 | 2025 | |||
| Infrastructure improvements and conformity (i) | 1,727 | 12,172 | 7,744 | 15,191 | |||
| Mine maintenance garage expansion | -- | -- | -- | 457 | |||
| Deposits or final payments for mining equipment | 11,325 | 9,404 | 11,346 | 15,623 | |||
| Other (ii) | 12,702 | 1,099 | 15,163 | 7,078 | |||
| Other Capital Development Expenditures | 25,754 | 22,675 | 34,253 | 38,349 |
| (i) | Infrastructure improvements and conformity expenditures included various capital projects aimed at improving the performance or capacity of assets and complying with various regulations governing mining practices. |
| (ii) | Other expenditures included cash borrowing costs capitalized on the DRPF project and the construction of new ventilation shafts related to underground infrastructure at Rana Gruber's mine site. |
5. Conference Call and Webcast Information
A webcast and conference call to discuss the foregoing results will be held on October 29, 2026, at 9:00 AM (Montréal time) / October 30, 2026, at 12:00 AM (Sydney time). Listeners may access a live webcast of the conference call from the Investors section of the Company's website at www.championiron.com/investors/events-presentations or by dialing toll free +1-888-699-1199 within North America or +61-2-8017-1385 from Australia.
An online archive of the webcast will be available by accessing the Company's website at www.championiron.com/investors/events-presentations . A telephone replay will be available for one week after the call by dialing +1-888-660-6345 within North America or +1-289-819-1450 overseas, and entering passcode 56477#.
About Champion Iron Limited
Champion is a high-purity iron ore producer with operations in Canada and Norway. Through Quebec Iron Ore Inc., Champion owns and operates the Bloom Lake Mining Complex located on the south end of the Labrador Trough, approximately 13 kilometres north of Fermont, Québec. Bloom Lake is an open-pit operation with two concentration plants that primarily source energy from renewable hydroelectric power, having a combined nameplate capacity of 15 million wmt per year that produce low contaminant high-purity iron ore concentrates with a proven ability to produce direct reduction grade quality iron ore concentrate. The iron ore concentrate from Bloom Lake is transported by rail to a ship loading port in Sept-Îles, Québec. Benefiting from one of the highest purity resources globally, Champion has completed the construction of the DRPF project, which is designed to upgrade up to half of Bloom Lake's mine capacity to a direct reduction quality pellet feed iron ore with up to 69% Fe, and is currently progressing through its commissioning and ramp-up phase. Bloom Lake's high-purity and lower contaminant iron ore products have attracted a premium to the P61 index (formerly, the P62 index). Champion also owns and operates Rana Gruber AS, a Norwegian iron ore producer based in Mo i Rana, Nordland. With continuous production dating back to the 1960s, Rana Gruber produces approximately 1.8 million dmt per year of hematite and magnetite iron ore concentrates. Champion has delivered iron ore concentrates to global markets, including China, Japan, the Middle East, Europe, South Korea, India, Southeast Asia, North Africa and Canada. In addition to its producing mines, Champion holds a 51% interest in Kami Iron Mine Partnership, which is jointly owned with Nippon Steel Corporation and Sojitz Corporation, and through which the Kami Project is held. Located approximately 21 kilometres southeast of Bloom Lake, the Kami Project benefits from access to existing infrastructure. Champion also holds a portfolio of exploration and development projects in the Labrador Trough, including the Cluster II properties, which are situated within 60 kilometres south of Bloom Lake.
Cautionary Note Regarding Forward-Looking Statements
This press release contains certain information and statements that may constitute "forward-looking information" or "forward-looking statements" under applicable securities legislation ("Forward-Looking Statements"). Forward-Looking Statements are statements that are not historical facts and are generally, but not always, identified by the use of words such as "will", "plans", "expects", "is expected", "budget", "scheduled", "estimates", "continues", "forecasts", "projects", "predicts", "intends", "anticipates", "aims", "targets", "priority", "positioned", "potential" or "believes", or variations of, or the negatives of, such words and phrases or state that certain actions, events or results "may", "could", "would", "should", "might" or "will" be taken, occur or be achieved. Inherent in Forward-Looking Statements are risks, uncertainties and other factors beyond the Company's ability to predict or control. The cautionary statements in this press release qualify all Forward-Looking Statements made in this press release.
Specific Forward-Looking Statements
All statements, other than statements of historical facts, included in this press release that address future events, developments or performance that Champion expects, anticipates or believes may or will occur are Forward-Looking Statements. Forward-Looking Statements may include, among other things, Management's expectations regarding: (i) Bloom Lake's LoM, long-term investment plan and efforts to improve recovery rates, production, economic and other benefits, nameplate capacity and related opportunities and benefits; (ii) the project to upgrade the Bloom Lake iron ore concentrate to a higher purity and to convert approximately half of Bloom Lake's increased mine capacity to a DR quality pellet feed iron ore (the DRPF project), the commissioning and ramp-up of the DRPF project, expected DRPF project timeline, including the anticipated timeline for initial saleable production and full production capacity, remaining completion expenditures and budget, pricing premiums, efficiencies, economic and other benefits, related engagement with, and expectations with respect to, prospective customers, the expected commercial shipments of iron ore, including the additional test-cargoes and commercial agreements for shipments scheduled for the third quarter of FY2027, the confirmation of DRPF product quality and the continued improvement of average product quality towards the project's target specifications, and ramping-up and achieving full production capacity of the DRPF project and the impact thereof on production, sales and financial results and the timing thereof; (iii) the Rana Gruber Acquisition, including the expectations regarding the integration of Rana Gruber, Rana Gruber's annual production of iron ore concentrates and the ability of Champion to realize the anticipated benefits of the Rana Gruber Acquisition; (iv) the shift in steel industry production methods, expected rising demand for higher-purity iron ore products and DRI globally and related market deficit and higher premiums, and the Company's participation therein, contribution thereto and positioning in connection therewith, including the transition of the Company's product offering (including producing high-purity DRPF products) and the expansion of its geography, markets and customer base, related investments and expected benefits thereof; (v) maintaining stripping activities cadence; (vi) ore inventory management strategies, including product blending, short-term stockpiling and reducing inventory levels at Rana Gruber; (vii) the Company's safe tailings strategy, tailings investment plan and mining equipment rebuild programs; (viii) the relationship between iron ore prices and ocean freight costs (including C3 index outlook) and their impact on the Company; (ix) the impact of iron ore price fluctuations on the Company and its financial results and the occurrence of certain events and their impact on iron ore prices and demand for high-purity iron ore products; (x) production and recovery rates and levels, ore characteristics and the Company's performance and related strategies and work programs to optimize operations, including ore blending optimization; (xi) pricing of the Company's products (including provisional pricing); (xii) the Company's expected iron ore concentrates production and sales, mining and hauling activities and related costs; (xiii) the Company's iron ore concentrates pricing trends compared to the P65 index; (xiv) available liquidity and the Company's financial flexibility, including spending prioritization; (xv) the Company's beliefs regarding non-IFRS and other financial measures, including usefulness of those measures for investors to understand the Company's results and ability to generate operating earnings, compare operating results between periods, evaluate business performance, assess liquidity and cash flows to fund working capital needs and capital expenditures, and service debt obligations; (xvi) the Company's strategic and growth initiatives and opportunities generally, including that such initiatives are subject to market conditions and funding capabilities, and their potential to optimize shareholder returns, unlock value for stakeholders and reinforce the Company's leadership in the high-purity iron ore industry; (xvii) the impact of the conflict in the Middle East, trade policy measures (including the European Union's safeguard framework and carbon border adjustment mechanism) and other geopolitical developments on iron ore demand and prices, freight and fuel costs and the Company's operations; and (xviii) the Company's operational optimization and cost reduction initiatives and their expected benefits, and the prioritization of exploration programs.
Risks
Although the Company believes the expectations expressed in such Forward-Looking Statements are based on reasonable assumptions, such Forward-Looking Statements involve known and unknown risks, uncertainties and other factors, most of which are beyond the control of the Company, which may cause the Company's actual results, performance or achievements to differ materially from those expressed or implied by such Forward-Looking Statements. Factors that could cause actual results to differ materially from those expressed in Forward-Looking Statements include, without limitation: (i) iron ore prices; (ii) energy prices; (iii) operating costs; (iv) freight costs; (v) general economic, competitive, political and social uncertainties; (vi) continued availability of capital and financing and general economic, market or business conditions; (vii) timing of and uncertainty regarding the steel industry shift in production methods, impacting demand for high-purity feed; (viii) failure of plant, equipment or processes, including those of third-party providers or counterparties, to operate as anticipated; (ix) delays in obtaining governmental approvals, necessary permitting or in the completion of development or construction activities; (x) the results of feasibility studies; (xi) changes in the assumptions used to prepare feasibility studies; (xii) project delays, including delays in the commissioning and ramp-up of the DRPF project; (xiii) geopolitical events, including the conflict in the Middle East; (xiv) the effects of catastrophes and public health crises on the global economy, the iron ore market and Champion's operations; (xv) the Company's ability to comply with the covenants under its credit facilities, the expiry of temporary covenant relief and the Company's ability to obtain further amendments, waivers or additional financing on acceptable terms or at all; (xvi) the ability of the DRPF project to consistently produce product meeting customer quality specifications and the acceptance of DRPF product by customers; (xvii) trade policies, tariffs, safeguard measures and carbon border adjustment mechanisms; (xviii) fluctuations in foreign exchange rates and the effectiveness of, and counterparty risk under, the Company's hedging arrangements; and (xix) risks relating to the integration of Rana Gruber and the realization of the anticipated benefits of the Rana Gruber Acquisition, as well as those factors discussed in the section entitled "Risk Factors" of the Company's Management's Discussion and Analysis for the financial year ended March 31, 2026, available under the Company's profile on the ASX at www.asx.com.au , SEDAR+ at www.sedarplus.ca and the Company's website at www.championiron.com .
There can be no assurance that any such Forward-Looking Statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such Forward-Looking Statements. Accordingly, readers should not place undue reliance on Forward-Looking Statements.
Additional Updates
All of the Forward-Looking Statements contained in this press release are given as of the date hereof or such other date or dates specified in the Forward-Looking Statements and are based upon the judgment and estimates of Champion's Management and information available to Management as at the date hereof. Champion disclaims any intention or obligation to update or revise any of the Forward-Looking Statements, whether as a result of new information, future events or otherwise, except as required by law or the listing rules of any stock exchange on which the Company's securities are listed, including the Company's continuous disclosure obligations under the ASX Listing Rules and applicable Canadian securities laws. If the Company does update one or more Forward-Looking Statements, no inference should be drawn that it will make additional updates with respect to those or other Forward-Looking Statements. Champion cautions that the foregoing list of risks and uncertainties is not exhaustive. Readers should carefully consider the above factors as well as the uncertainties they represent and the risks they entail.
Abbreviations
Unless otherwise specified, all dollar figures stated herein are expressed in Canadian dollars. The following abbreviations and definitions are used throughout this release: US$ (United States dollar), C$ (Canadian dollar), Fe (iron), wmt (wet metric tonnes), dmt (dry metric tonnes), M (million), km (kilometers), LoM (life of mine), Bloom Lake or Bloom Lake Mine (Bloom Lake Mining Complex), Rana Gruber Mine (Mo i Rana Mining Complex), DR (Direct Reduction), DRPF (Direct Reduction Pellet Feed), Kami Project (Kamistiatusset project), C3 index (C3 Baltic Capesize index), P61 index (Platts IODEX 61% Fe CFR China index), P62 index (Platts IODEX 62% Fe CFR China index), P65 index (Platts IODEX 65% Fe CFR China index), EBITDA (earnings before income and mining taxes, net finance costs and depreciation) and EPS (earnings per share). The utilization of "Champion" or the "Company" refers to Champion Iron Limited and/or one, or more, or all of its subsidiaries, as applicable, and "QIO" refers to Quebec Iron Ore Inc. The term "IFRS" refers to International Financial Reporting Standards as issued by the International Accounting Standards Board.
Nouvelles
Consultez notre infolettre (PDF) »
CHAMPION IRON ANNONCE SES RÉSULTATS PROVISOIRES POUR LE DEUXIÈME TRIMESTRE DE L'EXERCICE FINANCIER 2027 AINSI QUE LA DATE DE DIFFUSION DE SES RÉSULTATS DÉFINITIFS ET LES DÉTAILS DE L'APPEL CONFÉRENCE ET DE LA WEBDIFFUSION
MONTRÉAL, le 14 oct. 2026 /CNW/ -- SYDNEY, le 15 octobre 2026 - Champion Iron Limited (TSX : CIA) (ASX : CIA) (OTCQX : CIAFF) (« Champion » ou la « Société ») annonce sa production, son volume de ventes et ses prix réalisés provisoires pour le deuxième trimestre terminé le 30 septembre 2026 (« T2 ») de l'exercice financier se terminant le 31 mars 2027 (« exercice 2027 »). Ces résultats sont provisoires, non audités et reflètent les estimations actuelles de la direction; ils n'ont pas été examinés par les auditeurs de la Société et restent sujets à la finalisation des procédures trimestrielles de clôture et d'examen financiers de la Société. Les résultats définitifs pourraient être différents de ceux indiqués ci-dessous.
Résultats opérationnels provisoires et résultats financiers non audités du T2 de l'exercice 2027
- 3,9 millions de tonnes métriques humides de concentré de minerai de fer produit
- 4,5 millions de tonnes métriques sèches de concentré de minerai de fer vendu
- Prix de vente moyen réalisé net1 de 89,9 $/tonne métrique sèche et produits de 403,9 millions de dollars
Détails relatifs à l'appel conférence du T2 de l'exercice 2027 et à sa webdiffusion
Champion annonce également que la Société tiendra un appel conférence et une webdiffusion avec la haute direction le 29 octobre 2026 à 9 h 00 (heure de Montréal) / le 30 octobre 2026 à 00 h 00 (heure de Sydney), afin de passer en revue les résultats opérationnels et financiers de la Société pour le T2 de l'exercice 2027.
Les états financiers et le rapport de gestion de Champion pour le T2 de l'exercice 2027 seront publiés avant l'appel conférence et la webdiffusion et seront disponibles sur le site Web de la Société à la section « Rapports réglementaires & financiers » à l'adresse www.championiron.com , sous le profil de la Société auprès de l'ASX à l'adresse www.asx.com.au et sur SEDAR+ à l'adresse www.sedarplus.ca . Si les résultats définitifs sont sensiblement différents des résultats provisoires publiés dans le présent communiqué, la Société en informera promptement le marché conformément à ses obligations d'information continue.
Une retransmission audio de l'appel conférence sera disponible pour une période de 90 jours sur le site Web de Champion à l'adresse www.championiron.com/investisseurs/evenements-presentations .
Accès à l'appel conférence :
| Tél. local et outremer : | (+1) 416 945 7677 | |
| Tél. Amérique du Nord : | (+1) 888 699 1199 | |
| Tél. Australie : | (+61) 2 8017 1385 | |
| Webdiffusion : | www.championiron.com/investisseurs | |
| Retransmission outremer : | (+1) 289 819 1450 | |
| Retransmission Amérique du Nord : | (+1) 888 660 6345 | |
| Code d'accès à la retransmission : | 56477 # | |
| Expiration de la retransmission : | Jeudi 5 novembre 2026 à 23 h 59 (heure de Montréal) / Vendredi 6 novembre 2026 à 15 h 59 (heure de Sydney) |
À propos de Champion Iron Limited
Champion est un producteur de minerai de fer de haute pureté, avec des activités au Canada et en Norvège. Par l'entremise de Minerai de fer Québec inc., Champion détient et exploite le complexe minier du Lac Bloom (« Lac Bloom ») situé à l'extrémité sud de la Fosse du Labrador, à environ 13 kilomètres au nord de Fermont, Québec. Le Lac Bloom est une mine à ciel ouvert avec deux usines de concentration qui s'alimentent principalement en énergie hydroélectrique renouvelable, ayant une capacité nominale combinée de 15 millions de tonnes métriques humides par année. Les deux usines de concentration produisent des concentrés de minerai de fer de haute pureté avec de faibles teneurs en contaminants et ont prouvé leur capacité à produire un concentré de qualité supérieure destiné à la réduction directe. Le concentré de minerai de fer du Lac Bloom est expédié par rail jusqu'au port de chargement situé à Sept-Îles, Québec. Bénéficiant de l'une des ressources les plus pures au monde, Champion met en œuvre un programme de travaux pour être en mesure de convertir jusqu'à la moitié de la capacité de la mine du Lac Bloom afin de produire du matériel de qualité réduction directe pour boulettes pouvant atteindre 69 % Fe. Les produits de minerai de fer de haute pureté et à plus faible teneur en contaminants du Lac Bloom ont su se mériter une prime par rapport à l'indice Platts IODEX CFR Chine pour le minerai de fer à 61 % Fe (anciennement, l'indice Platts IODEX CFR Chine pour le minerai de fer à 62 % Fe). Champion détient et exploite également Rana Gruber AS (« Rana Gruber »), un producteur norvégien de minerai de fer établi à Mo i Rana, Nordland. Avec une production continue depuis les années 1960, Rana Gruber produit environ 1,8 million de tonnes métriques sèches par année de concentré de minerai de fer, d'hématite et de magnétite. Champion a livré ses concentrés de minerai de fer à l'échelle mondiale, notamment en Chine, au Japon, au Moyen-Orient, en Europe, en Corée du Sud, en Inde, en Asie du Sud-est, en Afrique du Nord et au Canada. En plus de ses mines en production, Champion détient une participation de 51 % dans Kami Iron Mine Partnership, détenu conjointement avec Nippon Steel Corporation et Sojitz Corporation et par l'intermédiaire duquel le projet Kami est détenu. Situé à environ 21 kilomètres au sud-est du Lac Bloom, le projet Kami bénéficie d'un accès aux infrastructures existantes. Champion détient également un portefeuille de projets d'exploration et de développement dans la Fosse du Labrador, incluant les propriétés Cluster II, situées à moins de 60 kilomètres au sud du Lac Bloom.
Pour plus de renseignements sur Champion Iron Limited, veuillez visiter notre site Web à l'adresse : www.championiron.com .
La diffusion à l'ASX du présent communiqué a été autorisée par le chef de la direction de Champion Iron Limited, David Cataford, conformément à la règle d'inscription 15.5 de l'ASX.
Sauf indication contraire, tous les montants en dollars indiqués dans les présentes sont libellés en dollars canadiens.
Énoncés prospectifs
Le présent communiqué de presse contient de l'« information prospective » et des « énoncés prospectifs » au sens des lois sur les valeurs mobilières applicables, incluant les résultats provisoires pour le T2 de l'exercice 2027, la date de publication prévue des états financiers et du rapport de gestion de la Société, la date de l'appel conférence et de la webdiffusion et la disponibilité de la webdiffusion et de la retransmission, la production du Lac Bloom, la capacité nominale, la qualité des produits et la capacité de produire du concentré de minerai de fer destiné à la réduction directe, le programme de travaux visant à convertir jusqu'à la moitié de la capacité de la mine du Lac Bloom pour produire du minerai de fer de qualité réduction directe pour bouletage (le projet RDPB), la production annuelle prévue de Rana Gruber, et l'avis de la Société concernant les mesures non conformes aux IFRS et les autres mesures financières, y compris le prix de vente moyen réalisé net et l'utilité de ces mesures pour les investisseurs. Les résultats provisoires reflètent les estimations de la direction fondées sur les informations disponibles en date du présent communiqué de presse et restent sujets à la finalisation des procédures trimestrielles de clôture et d'examen financiers de la Société, y compris la finalisation des ajustements de prix provisoires, des frais de transport maritime et autres ajustements de clôture. Bien que la Société croie que les attentes exprimées dans ces énoncés prospectifs sont basées sur des hypothèses raisonnables, de tels énoncés prospectifs impliquent des risques, incertitudes et autres facteurs connus et inconnus et les résultats réels pourraient être sensiblement différents de ceux anticipés dans les énoncés prospectifs; les lecteurs ne devraient donc pas accorder d'importance indue à ces énoncés. Des facteurs susceptibles de causer de telles variations entre les résultats réels et ceux indiqués dans les énoncés prospectifs incluent, sans s'y limiter, les prix du minerai de fer; les prix de l'énergie; les coûts d'exploitation; les coûts de transport; les incertitudes générales économiques, concurrentielles, politiques et sociales; la disponibilité continue de capital et de financement ainsi que l'état général de l'économie, du marché et des affaires; des défaillances des usines, des équipements ou des processus à opérer comme prévu, y compris ceux des fournisseurs tiers ou des contreparties; des retards dans l'obtention d'approbations gouvernementales, des permis nécessaires ou dans l'achèvement d'activités de développement ou de construction; les délais dans les projets; les événements géopolitiques; et les effets de catastrophes et de crises de santé publique sur l'économie mondiale, le marché du minerai de fer et les opérations de Champion, ainsi que les facteurs traités dans la section sur les facteurs de risque du rapport de gestion de la Société pour l'exercice financier terminé le 31 mars 2026, disponible sous le profil de la Société auprès de l'ASX à l'adresse www.asx.com.au , sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à l'adresse www.championiron.com . Sous réserve des obligations d'information continue de la Société en vertu des règles d'inscription de l'ASX et de toute autre obligation en vertu de la législation ou de la règlementation boursière applicables, la Société ne s'engage pas à mettre à jour les énoncés prospectifs.
__________________________________
1 Le prix de vente moyen réalisé net est une mesure financière non conforme aux IFRS calculée comme étant les produits divisés par le concentré de minerai de fer vendu en tonnes métriques sèches. Cette mesure n'est pas une mesure financière standardisée en vertu des IFRS et pourrait ne pas être comparable à des mesures financières similaires utilisées par d'autres émetteurs. Elle ne doit pas être considérée isolément ni comme substitut aux fins de l'analyse de l'information financière de la Société présentée conformément aux IFRS. Cette mesure a pour but d'aider les investisseurs à évaluer la performance de la Société.
SOURCE Champion Iron Limited

Pour plus de renseignements: Pour plus de renseignements, veuillez contacter : [email protected], 514-316-4858; Demandes des médias : Noémie Prégent-Charlebois, vice-présidente, Communications, Affaires gouvernementales et Communautés; Relations avec les investisseurs : Alexandre Buissières, directeur, Développement corporatif et marchés des capitaux
[Champion Iron s'engage dans des projets performants,
à faible impact environnemental.
---------------------------------------------------------------------------------------
\
Investissez dans l'avenir brillant des mines\
‘Voir notre plus récent rapport d'activité»
](https://www.championiron.com/investisseurs/telecharger-le-guide-de-linvestisseur/?lang=fr)
Inscrivez-vous à l’infolettre Champion Iron
Voir tous les prix du marché »
Voir tous les prix du marché »
Siège social
Montréal
1155 René-Lévesque West
Suite 3300
Montréal QC H3B 3X7
Tél.: +1 514 316 4858
Téléc.: +1 514 871 8270
Australie
91, Evans Street
Rozelle NSW 2039
Tél.: +61 2 98107816
Téléc.: +61 2 86555017
Toronto
20, Adelaide Street East
Suite 200
Toronto ON M5C 2T6
Tél.: +1 416 866-2200
Sans frais (Amérique du Nord) :
+1 877 448-2201
Téléc.: +1 416 361-1333
×
(opens in a new window)
Press Releases
Consult our newsletters (PDF) »
CHAMPION IRON ANNOUNCES ITS FY2027 SECOND QUARTER PRELIMINARY RESULTS AND NOTICE OF FINAL RESULTS, CONFERENCE CALL AND WEBCAST DETAILS
MONTRÉAL, Oct. 14, 2026 /CNW/ -- SYDNEY, October 15, 2026 - Champion Iron Limited (TSX: CIA) (ASX: CIA) (OTCQX: CIAFF) ("Champion" or the "Company") announces its preliminary production, sales volume and realized prices for the second quarter ended September 30, 2026 ("Q2 FY2027") of the financial year ending March 31, 2027. These results are preliminary, unaudited and based on management's current estimates, have not been reviewed by the Company's auditors, and remain subject to the completion of the Company's quarterly financial close and review procedures. Final results may differ from those set out below.
Q2 FY2027 Preliminary Operational and Unaudited Financial Results
- Iron ore concentrate produced of 3.9 million wet metric tonnes
- Iron ore concentrate sold of 4.5 million dry metric tonnes
- Net average realized selling price1 of $89.9/dry metric tonne and revenues of $403.9 million
Q2 FY2027 Results Conference Call and Webcast Details
The Company also announces that it will host a conference call and webcast with its senior management on October 29, 2026, at 9:00 AM (Montréal time) / October 30, 2026, at 12:00 AM (Sydney time), to review the Company's operational and financial results for Q2 FY2027.
Champion's financial statements and management's discussion and analysis for Q2 FY2027 will be released before the conference call and webcast and will be available in the "Financial & Regulatory Reports" section of the Company's website at www.championiron.com , under the Company's profile on the ASX at www.asx.com.au and on SEDAR+ at www.sedarplus.ca . If the final results differ materially from the preliminary results reported in this press release, the Company will promptly inform the market in accordance with its continuous disclosure obligations.
An audio webcast of the conference call will be accessible for a period of 90 days through Champion's website at www.championiron.com/investors/events-presentations .
Access to the Conference Call:
| Tel. local & overseas: | (+1) 416 945 7677 | |
| Tel. North America: | (+1) 888 699 1199 | |
| Tel. Australia: | (+61) 2 8017 1385 | |
| Webcast: | www.championiron.com/investors | |
| Replay overseas: | (+1) 289 819 1450 | |
| Replay N. America: | (+1) 888 660 6345 | |
| Replay passcode: | 56477 # | |
| Replay expiration: | Thursday, November 5, 2026, at 11:59 PM (Montréal time) / Friday, November 6, 2026, at 3:59 PM (Sydney time) |
About Champion Iron Limited
Champion is a high-purity iron ore producer with operations in Canada and Norway. Through Quebec Iron Ore Inc., Champion owns and operates the Bloom Lake Mining Complex ("Bloom Lake") located on the south end of the Labrador Trough, approximately 13 kilometres north of Fermont, Québec. Bloom Lake is an open-pit operation with two concentration plants that primarily source energy from renewable hydroelectric power, having a combined nameplate capacity of 15 million wet metric tonnes per year that produce low contaminant high-purity iron ore concentrates with a proven ability to produce direct reduction grade quality iron ore concentrate. The iron ore concentrate from Bloom Lake is transported by rail to a ship loading port in Sept-Îles, Québec. Benefiting from one of the highest purity resources globally, Champion is implementing a work program to be able to upgrade up to half of Bloom Lake's mine capacity to a direct reduction quality pellet feed iron ore with up to 69% Fe. Bloom Lake's high-purity and lower contaminant iron ore products have attracted a premium to the Platts IODEX 61% Fe CFR China index (formerly, the Platts IODEX 62% Fe CFR China index). Champion also owns and operates Rana Gruber AS ("Rana Gruber"), a Norwegian iron ore producer based in Mo i Rana, Nordland. With continuous production dating back to the 1960s, Rana Gruber produces approximately 1.8 million dry metric tonnes per year of hematite and magnetite iron ore concentrates. Champion has delivered iron ore concentrates to global markets, including China, Japan, the Middle East, Europe, South Korea, India, Southeast Asia, North Africa and Canada. In addition to its producing mines, Champion holds a 51% interest in Kami Iron Mine Partnership, which is jointly owned with Nippon Steel Corporation and Sojitz Corporation, and through which the Kami Project is held. Located approximately 21 kilometres southeast of Bloom Lake, the Kami Project benefits from access to existing infrastructure. Champion also holds a portfolio of exploration and development projects in the Labrador Trough, including the Cluster II properties, which are situated within 60 kilometres south of Bloom Lake.
For additional information on Champion Iron Limited, please visit our website at: www.championiron.com .
This press release has been authorized for release to ASX by the Chief Executive Officer of Champion Iron Limited, David Cataford, in accordance with ASX listing Rule 15.5.
Unless otherwise specified, all dollar figures stated herein are expressed in Canadian dollars.
Forward-Looking Statements
This press release contains "forward-looking information" and "forward-looking statements" within the meaning of applicable securities laws, including the preliminary results for Q2 FY2027, the expected timing of release of the Company's financial statements and management's discussion and analysis, the timing of the conference call and webcast and the availability of the webcast and replay, Bloom Lake's production, nameplate capacity, product quality and ability to produce direct reduction quality iron ore concentrate, the work program to upgrade up to half of Bloom Lake's mine capacity to a direct reduction quality pellet feed iron ore (the DRPF project), Rana Gruber's expected annual production, and the Company's beliefs regarding non-IFRS and other financial measures, including net average realized selling price and the usefulness of those measures for investors. The preliminary results are management estimates based on information available at the date of this press release and remain subject to completion of the Company's quarterly financial close and review procedures, including the finalisation of provisional pricing, freight and other period-end adjustments. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such forward-looking statements involve known and unknown risks, uncertainties and other factors and actual results may differ materially from those anticipated in the forward-looking statements, and readers should not place undue reliance on these statements. Factors that could cause actual results to differ materially from those expressed in forward-looking statements include, without limitation, iron ore prices; energy prices; operating costs; freight costs; general economic, competitive, political and social uncertainties; continued availability of capital and financing and general economic, market or business conditions; failure of plant, equipment or processes, including those of third party providers or counterparties, to operate as anticipated; delays in obtaining governmental approvals, necessary permitting or in the completion of development or construction activities; project delays; geopolitical events; and the effects of catastrophes and public health crises on the global economy, the iron ore market and Champion's operations, as well as those factors discussed in the section entitled "Risk Factors" of the Company's Management's Discussion and Analysis for the financial year ended March 31, 2026, available under the Company's profile on the ASX at www.asx.com.au , SEDAR+ at www.sedarplus.ca and the Company's website at www.championiron.com . Subject to the Company's continuous disclosure obligations under the ASX Listing Rules and any other obligations under applicable law or stock exchange rules, the Company does not undertake to update any forward-looking statement.
______________________________________
1 Net average realized selling price is a non-IFRS financial measure calculated as revenues divided by iron ore concentrate sold in dry metric tonnes. This measure is not a standardized financial measure under IFRS and may not be comparable to similar financial measures used by other issuers. It should not be considered in isolation or as a substitute for analysis of the Company's financial information reported under IFRS. This measure is intended to help investors evaluate the Company's performance.
SOURCE Champion Iron Limited

Nouvelles
Consultez notre infolettre (PDF) »
CHAMPION IRON ANNONCE LES RÉSULTATS DE VOTE DE SON ASSEMBLÉE GÉNÉRALE ANNUELLE DE L'EXERCICE FINANCIER 2026
MONTRÉAL, le 26 août 2026 /CNW/ -- SYDNEY, le 27 août 2026 - Champion Iron Limited (TSX : CIA) (ASX : CIA) (OTCQX : CIAFF) (« Champion » ou la « Société ») annonce que lors de l'assemblée générale annuelle des actionnaires de la Société (l'« Assemblée »), laquelle a eu lieu en format présentiel le mercredi 26 août 2026 à 17 h 00 (heure de Montréal) / le jeudi 27 août 2026 à 7 h 00 (heure de Sydney), toutes les résolutions ont obtenu la majorité requise lors d'un vote par scrutin tel que décrit ci-dessous. Le nombre de votes exprimés contre la résolution 1 constitue une « deuxième prise » (second strike) selon les lois australiennes. Cependant, la résolution 2, la résolution supplémentaire conditionnelle (Conditional Spill Resolution), n'a pas été adoptée, tel que recommandé par le conseil d'administration.
| Résolution | VotesEn faveur | VotesContre | VotesAbstentions/Exclusions |
| 1. Approbation du rapport de rémunération | 251 815 638(63,48 %) | 144 889 606(36,52 %) | 38 271 033 (1) |
| 2. Résolution supplémentaire conditionnelle (Conditional Spill Resolution) | 5 986 801(1,51 %) | 390 668 076(98,49 %) | 38 321 400 (1) |
| 3. Ré-élection de l'administrateur - Michael O'Keeffe | 426 304 947(98,03 %) | 8 576 917(1,97 %) | 94 415 (2) |
| 4. Ré-élection de l'administrateur - David Cataford | 432 092 033(99,36 %) | 2 793 130(0,64 %) | 91 115 (2) |
| 5. Ré-élection de l'administrateur - Gary Lawler | 339 594 158(78,09 %) | 95 286 720(21,91 %) | 95 400 (2) |
| 6. Ré-élection de l'administratrice - Michelle Cormier | 349 195 657(80,30 %) | 85 681 876(19,70 %) | 98 745 (2) |
| 7. Ré-élection de l'administratrice - Louise Grondin | 361 355 994(83,09 %) | 73 521 927(16,91 %) | 98 357 (2) |
| 8. Ré-élection de l'administrateur - Jyothish George | 432 922 075(99,55 %) | 1 960 896(0,45 %) | 93 307 (2) |
| 9. Ré-élection de l'administrateur - Ronnie Beevor | 360 466 899(82,89 %) | 74 415 072(17,11 %) | 94 307 (2) |
| Notes : | (1) Représente les droits de vote détenus directement ou indirectement par des principaux dirigeants de Champion ( « PD ») (au sens du terme Key Management Personnel de la Corporations Act 2001 (Cth)) et leurs parties étroitement liées, que ce soit en tant qu'actionnaires ou fondés de pouvoir, qui ont tous été exclus du vote (sauf s'ils ont agi en tant que fondés de pouvoir pour exprimer un vote dirigé), ainsi que les actions ordinaires de la Société qui ont fait l'objet d'une abstention. Ce nombre exclut les votes exercés par le président d'Assemblée sur la base d'une procuration non dirigée, lorsque la procuration n'indiquait pas expressément au président d'Assemblée la manière de voter sur la résolution. |
| (2) Représente des actions ordinaires de la Société qui ont fait l'objet d'une abstention. Ce nombre exclut les votes exercés par le président d'Assemblée sur la base d'une procuration non dirigée, lorsque la procuration n'indiquait pas expressément au président d'Assemblée la manière de voter sur la résolution. |
Madame Jessica McDonald n'a pas sollicité de nouveau mandat lors de l'Assemblée.
Lors de l'Assemblée, le nombre total d'actions ordinaires de la Société représentées en personne ou par procuration était de 434 976 279, ce qui correspond à environ 77,67% des actions ordinaires émises et en circulation de la Société.
Pour plus de détails, veuillez consulter les documents de la Société déposés sur SEDAR+ à l'adresse www.sedarplus.ca .
À propos de Champion Iron Limited
Champion est un producteur de minerai de fer de haute pureté, avec des activités au Canada et en Norvège. Par l'entremise de Minerai de fer Québec inc., Champion détient et exploite le complexe minier du Lac Bloom situé à l'extrémité sud de la Fosse du Labrador, à environ 13 kilomètres au nord de Fermont, Québec. La mine du Lac Bloom est une mine à ciel ouvert avec deux usines de concentration qui s'alimentent principalement en énergie hydroélectrique renouvelable, ayant une capacité nominale combinée de 15 millions de tonnes métriques humides par année. Les deux usines de concentration produisent des concentrés de minerai de fer de haute pureté avec de faibles teneurs en contaminants et ont prouvé leur capacité à produire un concentré de qualité supérieure destiné à la réduction directe. Le concentré de minerai de fer du Lac Bloom est expédié par rail jusqu'au port de chargement situé à Sept-Îles, Québec. Bénéficiant de l'une des ressources les plus pures au monde, Champion met en œuvre un programme de travaux pour être en mesure de convertir jusqu'à la moitié de la capacité de la mine du Lac Bloom afin de produire du matériel de qualité réduction directe pour boulettes pouvant atteindre 69 % Fe. Les produits de minerai de fer de haute pureté et à plus faible teneur en contaminants du Lac Bloom ont su se mériter une prime par rapport à l'indice P61 (anciennement, l'indice P62). Champion détient et exploite également Rana Gruber AS, un producteur norvégien de minerai de fer établi à Mo i Rana, Nordland. Avec une production continue depuis les années 1960, Rana Gruber produit environ 1,8 million de tonnes métriques sèches par année de concentré de minerai de fer d'hématite et de magnétite. Champion a livré ses concentrés de minerai de fer à l'échelle mondiale, notamment en Chine, au Japon, au Moyen-Orient, en Europe, en Corée du Sud, en Inde, en Asie du Sud-Est, en Afrique du Nord et au Canada. En plus de ses mines en production, Champion détient une participation de 51 % dans Kami Iron Mine Partnership, en partenariat avec Nippon Steel Corporation et Sojitz Corporation, par l'intermédiaire duquel le projet Kami est détenu. Situé à environ 21 kilomètres au sud-est du Lac Bloom, le projet bénéficie d'un accès aux infrastructures existantes. Champion détient également un portefeuille de projets d'exploration et de développement dans la Fosse du Labrador, incluant les propriétés Cluster II, situées à moins de 60 kilomètres au sud du Lac Bloom.
Pour de plus amples renseignements sur Champion Iron Limited, veuillez visiter notre site Web à l'adresse suivante : www.championiron.com .
La diffusion du présent communiqué de presse a été autorisée par le chef de la direction de Champion Iron Limited, David Cataford.
SOURCE Champion Iron Limited

Pour plus de renseignements: Pour de plus amples renseignements, veuillez communiquer avec : [email protected]
[Champion Iron s'engage dans des projets performants,
à faible impact environnemental.
---------------------------------------------------------------------------------------
\
Investissez dans l'avenir brillant des mines\
‘Voir notre plus récent rapport d'activité»
](https://www.championiron.com/investisseurs/telecharger-le-guide-de-linvestisseur/?lang=fr)
Inscrivez-vous à l’infolettre Champion Iron
Voir tous les prix du marché »
Voir tous les prix du marché »
Siège social
Montréal
1155 René-Lévesque West
Suite 3300
Montréal QC H3B 3X7
Tél.: +1 514 316 4858
Téléc.: +1 514 871 8270
Australie
91, Evans Street
Rozelle NSW 2039
Tél.: +61 2 98107816
Téléc.: +61 2 86555017
Toronto
20, Adelaide Street East
Suite 200
Toronto ON M5C 2T6
Tél.: +1 416 866-2200
Sans frais (Amérique du Nord) :
+1 877 448-2201
Téléc.: +1 416 361-1333
Inscrivez-vous à l’infolettre Champion Iron pour suivre notre croissance
×
(opens in a new window)
Press Releases
Consult our newsletters (PDF) »
CHAMPION IRON ANNOUNCES FY2026 ANNUAL GENERAL MEETING VOTING RESULTS
MONTRÉAL, Aug. 26, 2026 /CNW/ -- SYDNEY, August 27, 2026 - Champion Iron Limited (TSX: CIA) (ASX: CIA) (OTCQX: CIAFF) ("Champion" or the "Company") announces that at the Annual General Meeting of the Company's shareholders (the "Meeting"), held in person on Wednesday, August 26, 2026, at 5:00 PM (Montréal time) / Thursday, August 27, 2026, at 7:00 AM (Sydney time), all resolutions received the requisite majorities, by a vote by poll as set out below. The number of votes cast against Resolution 1 constitutes a "second strike" under Australian law. However, Resolution 2 (Conditional Spill Resolution) was not carried, as recommended by the board of directors.
| Resolution | Votes For | Votes Against | Votes Abstain/Exclude |
| 1. Approval of the Remuneration Report | 251,815,638(63.48 %) | 144,889,606(36.52 %) | 38,271,033 (1) |
| 2. Conditional Spill Resolution | 5,986,801(1.51 %) | 390,668,076(98.49 %) | 38,321,400 (1) |
| 3. Re-Election of Director – Michael O'Keeffe | 426,304,947(98.03 %) | 8,576,917(1.97 %) | 94,415 (2) |
| 4. Re-Election of Director – David Cataford | 432,092,033(99.36 %) | 2,793,130(0.64 %) | 91,115 (2) |
| 5. Re-Election of Director – Gary Lawler | 339,594,158(78.09 %) | 95,286,720(21.91 %) | 95,400 (2) |
| 6. Re-Election of Director – Michelle Cormier | 349,195,657(80.30 %) | 85,681,876(19.70 %) | 98,745 (2) |
| 7. Re-Election of Director – Louise Grondin | 361,355,994(83.09 %) | 73,521,927(16.91 %) | 98,357 (2) |
| 8. Re-Election of Director – Jyothish George | 432,922,075(99.55 %) | 1,960,896(0.45 %) | 93,307 (2) |
| 9. Re-Election of Director – Ronnie Beevor | 360,466,899(82.89 %) | 74,415,072(17.11 %) | 94,307 (2) |
| Notes: | (1) Represents votes held, directly or indirectly, by Champion's Key Management Personnel ("KMP") (as defined by the Corporations Act 2001 (Cth)) and their closely related parties, whether as a shareholder or as a proxy, all of which were excluded from voting (other than if they acted as a proxy casting a directed vote), plus ordinary shares of the Company which abstained from voting. This does not include votes exercised by the Chair of the Meeting on the basis of an undirected proxy, where the proxy did not expressly direct the Chair how to vote on the resolution. |
| (2) Represents ordinary shares of the Company which abstained from voting. This does not include votes exercised by the Chair of the Meeting on the basis of an undirected proxy, where the proxy did not expressly direct the Chair how to vote on the resolution. |
Ms. Jessica McDonald did not stand for re-election at the Meeting.
At the Meeting, the total number of ordinary shares of the Company represented in person or by proxy was 434,976,279 representing approximately 77.67% of the issued and outstanding ordinary shares of the Company.
For further details, visit the Company's filings on SEDAR+ at www.sedarplus.ca .
About Champion Iron Limited
Champion is a high-purity iron ore producer with operations in Canada and Norway. Through Quebec Iron Ore Inc., Champion owns and operates the Bloom Lake Mining Complex located on the south end of the Labrador Trough, approximately 13 kilometres north of Fermont, Québec. Bloom Lake is an open-pit operation with two concentration plants that primarily source energy from renewable hydroelectric power, having a combined nameplate capacity of 15M wet metric tonnes per year that produce low contaminant high-purity iron ore concentrates with a proven ability to produce direct reduction grade quality iron ore concentrate. The iron ore concentrate from Bloom Lake is transported by rail to a ship loading port in Sept-Îles, Québec. Benefiting from one of the highest purity resources globally, Champion is implementing a work program to be able to upgrade up to half of the Bloom Lake's mine capacity to a direct reduction quality pellet feed iron ore with up to 69% Fe. Bloom Lake's high-purity and lower contaminant iron ore products have attracted a premium to the P61 index (formerly, the P62 index). Champion also owns and operates Rana Gruber AS, a Norwegian iron ore producer based in Mo i Rana, Nordland. With continuous production dating back to the 1960s, Rana Gruber produces approximately 1.8M dry metric tonnes per year of hematite and magnetite iron ore concentrates. Champion has delivered iron ore concentrates to global markets, including China, Japan, the Middle East, Europe, South Korea, India, Southeast Asia, North Africa and Canada. In addition to its producing mines, Champion holds a 51% interest in Kami Iron Mine Partnership, which is jointly owned with Nippon Steel Corporation and Sojitz Corporation, and through which the Kami Project is held. Located approximately 21 kilometres southeast of Bloom Lake, the Kami Project benefits from access to existing infrastructure. Champion also holds a portfolio of exploration and development projects in the Labrador Trough, including the Cluster II properties, which are situated within 60 kilometres south of Bloom Lake.
For additional information on Champion Iron Limited, please visit our website at: www.championiron.com .
This press release has been authorized for release to the market by the CEO of Champion Iron Limited, David Cataford.
SOURCE Champion Iron Limited

Nouvelles
Consultez notre infolettre (PDF) »
CHAMPION IRON TIENDRA UNE ASSEMBLÉE GÉNÉRALE ANNUELLE DES ACTIONNAIRES LE 26 AOÛT 2026 (MONTRÉAL) / 27 AOÛT 2026 (SYDNEY)
MONTRÉAL, le 12 août 2026 /CNW/ -- SYDNEY**,** le 13 août 2026 - Champion Iron Limited (ASX : CIA) (TSX : CIA) (OTCQX : CIAFF) (« Champion » ou la « Société ») annonce qu'à la suite des divers dépôts effectués précédemment à cet égard, son assemblée générale annuelle des actionnaires (l'« assemblée ») aura lieu le mercredi 26 août 2026 à 17 h 00 (heure de Montréal) / le jeudi 27 août 2026 à 7 h 00 (heure de Sydney). Les informations de l'assemblée sont aussi disponibles auprès de l'ASX à l'adresse www.asx.com.au , sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à l'adresse www.championiron.com .
Les détails de l'assemblée sont indiqués ci-dessous :
| Dates : | Le mercredi 26 août 2026 (Montréal) Le jeudi 27 août 2026 (Sydney) | |
| Heures : | 17 h 00 (Montréal) 7 h 00 (Sydney) | |
| Lieu de l'assemblée : | McCarthyTétraultLLP1000, rue De La Gauchetière Ouest, bureau MZ400Montréal, QuébecH3B 0A2 |
Une webdiffusion audio en direct sera disponible le jour de l'assemblée et la retransmission de la conférence sera sur le site Internet de Champion à l'adresse www.championiron.com/investisseurs/evenements-presentations .
Accès à la conférence téléphonique :
| Tel. local & outre-mer : | (+1) 416 945 7677 | |
| Tel. Amérique du Nord : | (+1) 888 699 1199 | |
| Tel. Australie : | (+1) 61-2-8017-1385 | |
| Webdiffusion : | www.championiron.com/investisseurs | |
| Retransmission outre-mer : | (+1) 289 819 1450 | |
| Retransmission Amérique du Nord : | (+1) 888 660 6345 | |
| Numéro d'accès : | 47667 # | |
| Expiration : | Mercredi le 2 septembre 2026 à 23 h 59 (Montréal) Jeudi le 3 septembre 2026 à 13 h 59 (Sydney) |
**À propos de Champion Iron Limited
**Champion est un producteur de minerai de fer de haute pureté, avec des activités au Canada et en Norvège. Par l'entremise de Minerai de fer Québec inc., Champion détient et exploite le complexe minier du Lac Bloom situé à l'extrémité sud de la Fosse du Labrador, à environ 13 kilomètres au nord de Fermont, Québec. La mine du Lac Bloom est une mine à ciel ouvert avec deux usines de concentration qui s'alimentent principalement en énergie hydroélectrique renouvelable, ayant une capacité nominale combinée de 15 millions de tonnes métriques humides par année. Les deux usines de concentration produisent des concentrés de minerai de fer de haute pureté avec de faibles teneurs en contaminants et ont prouvé leur capacité à produire un concentré de qualité supérieure destiné à la réduction directe. Le concentré de minerai de fer du Lac Bloom est expédié par rail jusqu'au port de chargement situé à Sept-Îles, Québec. Bénéficiant de l'une des ressources les plus pures au monde, Champion met en œuvre un programme de travaux pour être en mesure de convertir jusqu'à la moitié de la capacité de la mine du Lac Bloom afin de produire du matériel de qualité réduction directe pour boulettes pouvant atteindre 69 % Fe. Les produits de minerai de fer de haute pureté et à plus faible teneur en contaminants du Lac Bloom ont su se mériter une prime par rapport à l'indice P61 (anciennement, l'indice P62). Champion détient et exploite également Rana Gruber AS, un producteur norvégien de minerai de fer établi à Mo i Rana, Nordland. Avec une production continue depuis les années 1960, Rana Gruber produit environ 1,8 million de tonnes métriques sèches par année de concentré de minerai de fer d'hématite et de magnétite. Champion a livré ses concentrés de minerai de fer à l'échelle mondiale, notamment en Chine, au Japon, au Moyen-Orient, en Europe, en Corée du Sud, en Inde, en Asie du Sud-Est, en Afrique du Nord et au Canada. En plus de ses mines en production, Champion détient une participation de 51 % dans Kami Iron Mine Partnership, en partenariat avec Nippon Steel Corporation et Sojitz Corporation, par l'intermédiaire duquel le projet Kami est détenu. Situé à environ 21 kilomètres au sud-est du Lac Bloom, le projet bénéficie d'un accès aux infrastructures existantes. Champion détient également un portefeuille de projets d'exploration et de développement dans la Fosse du Labrador, incluant les propriétés Cluster II, situées à moins de 60 kilomètres au sud du Lac Bloom.
Pour plus de renseignements sur Champion Iron Limited, veuillez visiter notre site Web à l'adresse : www.championiron.com .
La diffusion du présent communiqué a été autorisée par David Cataford, chef de la direction de Champion Iron Limited.
SOURCE Champion Iron Limited

Pour plus de renseignements: Pour plus de renseignements, veuillez contacter : [email protected]
[Champion Iron s'engage dans des projets performants,
à faible impact environnemental.
---------------------------------------------------------------------------------------
\
Investissez dans l'avenir brillant des mines\
‘Voir notre plus récent rapport d'activité»
](https://www.championiron.com/investisseurs/telecharger-le-guide-de-linvestisseur/?lang=fr)
Inscrivez-vous à l’infolettre Champion Iron
Voir tous les prix du marché »
Voir tous les prix du marché »
Siège social
Montréal
1155 René-Lévesque West
Suite 3300
Montréal QC H3B 3X7
Tél.: +1 514 316 4858
Téléc.: +1 514 871 8270
Australie
91, Evans Street
Rozelle NSW 2039
Tél.: +61 2 98107816
Téléc.: +61 2 86555017
Toronto
20, Adelaide Street East
Suite 200
Toronto ON M5C 2T6
Tél.: +1 416 866-2200
Sans frais (Amérique du Nord) :
+1 877 448-2201
Téléc.: +1 416 361-1333
Inscrivez-vous à l’infolettre Champion Iron pour suivre notre croissance
×
(opens in a new window)
Nouvelles
Consultez notre infolettre (PDF) »
CHAMPION IRON ANNONCE SES RÉSULTATS POUR LE PREMIER TRIMESTRE DE L'EXERCICE FINANCIER 2027
-
Production trimestrielle de 3,9 Mtmh, ventes de 3,3 Mtms, produits de 357 M$ et BAIIA de 33 M$1
-
Production initiale de minerai de fer de qualité RD dans le cadre du projet RDPB avec les premières expéditions prévues au deuxième trimestre de l'exercice financier 2027
-
Réalisation de l'acquisition de Rana Gruber, un producteur norvégien de minerai de fer de haute pureté de premier plan
MONTRÉAL, le 29 juill. 2026 /CNW/ -- SYDNEY, le 30 juillet 2026 - Champion Iron Limited (ASX: CIA) (TSX: CIA) (OTCQX: CIAFF) (« Champion » ou la « Société ») annonce ses résultats opérationnels et financiers pour son premier trimestre financier terminé le 30 juin 2026.
Le chef de la direction de Champion, M. David Cataford, a déclaré : « Dans un contexte marqué par l'incertitude économique et la volatilité des marchés, notre équipe demeure résolument engagée dans l'exécution de nos priorités stratégiques et dans l'optimisation de nos opérations afin de renforcer notre position concurrentielle et notre résilience financière. L'achèvement du projet RDPB démontre une fois de plus notre capacité à mener à bien des projets d'envergure, nous permettant d'établir des relations avec de nouveaux clients, de contribuer davantage à la décarbonation de l'industrie sidérurgique et d'améliorer les prix réalisés pour nos produits. Alors que nous complétons l'intégration de Rana Gruber, nous concentrons désormais nos efforts sur la concrétisation des occasions qui se présentent au sein de l'organisation, notamment par des initiatives de gestion des coûts, tout en continuant de déployer notre vision à long terme et en consolidant la position de Champion parmi les principaux fournisseurs mondiaux de minerai de fer de haute pureté. »
Détails relatifs à la conférence téléphonique
Champion tiendra une conférence téléphonique et une webdiffusion le 30 juillet 2026 à 9 h (heure de Montréal) / 23 h (heure de Sydney) pour discuter des résultats de son premier trimestre financier terminé le 30 juin 2026. Les détails relatifs à la conférence téléphonique sont fournis à la fin du présent communiqué de presse.
Note aux lecteurs
À la suite de l'acquisition de Rana Gruber AS (« Rana Gruber ») le 10 avril 2026, et afin d'assurer une transparence accrue à l'égard de la performance du Lac Bloom et de Rana Gruber, les données opérationnelles et les données financières sélectionnées sont présentées séparément pour le Lac Bloom et Rana Gruber à la section 2 du présent communiqué de presse. Il est également important de souligner qu'à la suite de cette acquisition, Champion a harmonisé l'information financière de Rana Gruber avec ses propres pratiques de présentation de l'information financière. Par conséquent, il convient de faire preuve de prudence lors de la comparaison des résultats de la période courante avec les résultats historiques de Rana Gruber publiés avant la réalisation de l'acquisition, ainsi qu'avec les résultats précédemment publiés par Champion. Des renseignements supplémentaires sur l'acquisition de Rana Gruber sont présentés dans les états financiers consolidés résumés non audités et le rapport de gestion connexe de la Société pour le trimestre terminé le 30 juin 2026, disponibles auprès de l'ASX à l'adresse www.asx.com.au , sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à l'adresse www.championiron.com .
1. Faits saillants du trimestre
Opérations et développement durable
- Aucun accident de travail sérieux ni incident environnemental majeur n'a été signalé durant le trimestre terminé le 30 juin 2026;
- Production trimestrielle de 3,9 Mtmh de concentrés de minerai de fer de haute pureté pour le trimestre terminé le 30 juin 2026, en progression de 12 % comparativement à la même période de l'année précédente, reflétant principalement l'acquisition de Rana Gruber (0,4 Mtmh) parallèlement à la performance opérationnelle du Lac Bloom (3,5 Mtmh); et
- Ventes trimestrielles de 3,3 Mtms de concentrés de minerai de fer de haute pureté (3,1 Mtms et 0,2 Mtms du Lac Bloom et de Rana Gruber, respectivement) pour le trimestre terminé le 30 juin 2026, en baisse de 13 % comparativement à la même période de l'année précédente, reflétant principalement la transition planifiée et le calendrier des expéditions en lien avec la montée en cadence du projet RDPB au Lac Bloom, en partie compensés par les ventes issues des activités de Rana Gruber.
Résultats financiers
- Les résultats financiers du trimestre ont été affectés par le calendrier des expéditions de minerai de fer en lien avec les activités de mise en service du projet RDPB, ce qui a fait en sorte de reporter à des périodes ultérieures une portion des produits et par conséquent, du résultat net, du BAIIA et des flux de trésorerie d'exploitation associés, ainsi que par les frais de transport maritime et de carburant plus élevés et par la répartition des coûts fixes sur des volumes plus faibles;
- Prix de vente moyen réalisé brut de 115,2 $ US/tms1, comparativement au prix moyen de l'indice P65 de 121,9 $ US/tms pour la période;
- Prix de vente moyen réalisé net de 77,5 $ US/tms1, en baisse de 11 % d'un trimestre à l'autre, mais en hausse de 6 % d'une année à l'autre;
- Coût comptant C1 pour les concentrés de minerai de fer chargés sur les navires totalisant 83,7 $/tms1 (60,5 $ US/tms)2, en hausse comparativement au coût de 81,9 $/tms1 (59,2 $ US/tms)2 enregistré à la même période en 2025. Le coût comptant C1 pour la période a été défavorablement affecté par la répartition des coûts fixes sur des volumes de ventes de minerai de fer plus faibles, ainsi que par la hausse substantielle des prix du carburant découlant du conflit au Moyen-Orient;
- Perte nette de 41,5 M$, ce qui représente une perte par action de 0,07 $, comparativement à un résultat net de 23,2 M$ (BPA de 0,04 $) au trimestre précédent et un résultat net de 23,8 M$ (BPA de 0,05 $) pour la même période de l'année précédente. La perte nette est principalement attribuable à une perte de change latente de 17,2 M$ sur des passifs monétaires nets libellés en monnaies étrangères, ainsi qu'aux variations défavorables de la juste valeur d'instruments dérivés de 17,6 M$;
- BAIIA de 32,8 M$1, comparativement à 114,3 M$1 au trimestre précédent et à 57,8 M$1 à la même période de l'année précédente, défavorablement affecté par plusieurs facteurs, dont le calendrier des ventes, les variations défavorables de la juste valeur d'instruments dérivés de 17,6 M$ qui ont aussi impacté la perte nette, les coûts de démarrage du projet RDPB de 6,6 M$ et les ajustements de valorisation d'inventaire liés à l'acquisition de Rana Gruber de 2,9 M$;
- Le solde de trésorerie, en excluant la portion inutilisée des contributions en espèces initiales de Nippon Steel Corporation (« Nippon Steel ») et Sojitz Corporation (« Sojitz », et collectivement avec Nippon Steel, les « partenaires ») détenue dans un compte de trésorerie affectée par Kami Iron Mine Partnership (le « partenariat Kami »), totalisait 198,6 M$ au 30 juin 2026, en baisse de 98,2 M$ depuis le 31 mars 2026, reflétant principalement les flux de trésorerie nets générés par les activités d'exploitation plus basses et l'utilisation des liquidités disponibles pour financer l'acquisition de Rana Gruber; et
- Les liquidités disponibles sont restées robustes à 653,1 M$1 au 30 juin 2026, comparativement à 812,4 M$1 au 31 mars 2026.
Mise à jour sur le projet RDPB
- Aboutissement du projet RDPB en respect du budget récemment estimé à 500 M$, avec des investissements cumulés totalisant 493,7 M$ au 30 juin 2026;
- Conclusion d'un accord commercial couvrant une portion de la capacité de production à brève échéance et poursuite des discussions avec d'autres clients potentiels; et
- Production des premiers lots de minerai de fer de qualité RD, avec les premières expéditions commerciales anticipées au troisième trimestre de l'année civile 2026.
Projets en développement et autres initiatives de croissance
- Réalisation de l'acquisition de Rana Gruber le 10 avril 2026; et
- Signature d'un nouveau prêt à terme dans le cadre des facilités de crédit de premier rang syndiquées de la Société afin de financer l'acquisition de Rana Gruber et report de l'échéance de la facilité de crédit renouvelable de premier rang de 400 M$ US jusqu'en avril 2030.
2. Résultats financiers et opérationnels
| T1 Exercice 2027 | T4 Exercice 2026 | Variation trimestrielle | T1 Exercice 2026 | Variation annuelle | |||
| Données d'exploitation consolidées | |||||||
| Concentrés de minerai de fer produits (tmh) | 3 939 400 | 3 435 100 | 15 % | 3 520 600 | 12 % | ||
| Concentrés de minerai de fer vendus (tms) | 3 339 000 | 3 455 400 | (3 %) | 3 831 800 | (13 %) | ||
| Données financières consolidées (en milliers de dollars) | |||||||
| Produits | 356 876 | 414 505 | (14 %) | 390 027 | (8 %) | ||
| Coût des ventes | 288 751 | 285 785 | 1 % | 313 928 | (8 %) | ||
| Résultat net (perte nette) | (41 528) | 23 186 | (279 %) | 23 784 | (275 %) | ||
| Résultat net ajusté (perte nette ajustée)1 | (35 229) | 23 186 | (252 %) | 23 784 | (248 %) | ||
| BAIIA1 | 32 790 | 114 340 | (71 %) | 57 753 | (43 %) | ||
| Statistiques consolidées (en dollars par tms vendue) | |||||||
| Prix de vente moyen réalisé brut1 | 158,7 | 165,1 | (4 %) | 146,0 | 9 % | ||
| Prix de vente moyen réalisé net1 | 106,9 | 120,0 | (11 %) | 101,8 | 5 % | ||
| Coût comptant C11 | 83,7 | 82,7 | 1 % | 81,9 | 2 % | ||
| CMTI1 | 111,3 | 96,9 | 15 % | 96,2 | 16 % | ||
| Marge d'exploitation1 | (4,4) | 23,1 | (119 %) | 5,6 | (179 %) |
A. Produits consolidés
Les produits ont totalisé 356,9 M$ pour le trimestre terminé le 30 juin 2026, en baisse de 33,2 M$ comparativement aux produits de 390,0 M$ enregistrés à la même période de l'année précédente, malgré l'inclusion de 23,9 M$ de produits de Rana Gruber suivant l'acquisition réalisée le 10 avril 2026. En excluant l'acquisition de Rana Gruber, les produits plus bas sont principalement attribuables au volume des ventes plus faible du Lac Bloom pour le trimestre terminé le 30 juin 2026 comparativement à la même période en 2025. Le volume des ventes du Lac Bloom a été affecté par le calendrier des expéditions maritimes, puisque les réservations de navires reflétaient une diminution anticipée des volumes transportés jusqu'au port de Sept-Îles durant la période de montée en cadence du projet RDPB. L'augmentation du prix de vente moyen réalisé brut a compensé l'augmentation des coûts de transport maritime au cours de la période, comparativement à la période précédente.
Pour le trimestre terminé le 30 juin 2026, le prix de vente moyen réalisé brut de 115,2 $ US/tms1 était inférieur à l'indice P65 moyen de 121,9 $ US/tms. Les 2,1 Mtms de minerai de fer vendues, mais toujours sujettes à des ajustements de prix au 30 juin 2026 ont été évaluées à un prix de vente à terme moyen de 110,4 $ US/tms, ce qui est inférieur au prix moyen de l'indice P65 pour la période. Par ailleurs, les prix des indices utilisés dans le cadre des ventes de concentré du Lac Bloom basés sur des prix fixés de façon rétrospective étaient aussi inférieurs au prix moyen de l'indice P65 pour la période. Au cours du trimestre, la Société a continué à se préparer pour la transition vers un produit RDPB de plus haute pureté au Lac Bloom et a intentionnellement alloué une proportion plus faible des volumes vendus en vertu de contrats à long terme. Cette approche a permis à la Société de rendre une plus grande proportion de ses produits de minerai de fer disponible sur les marchés à court terme et au comptant, qui ont récemment connu une plus grande volatilité ainsi que des prix plus bas que les principaux indices du secteur du minerai de fer.
Au cours du trimestre terminé le 30 juin 2026, un prix de vente final moyen de 118,3 $ US/tms a été établi pour les 2,3 Mtms de concentrés de minerai de fer vendues qui étaient sujettes à des ajustements de prix provisoires au 31 mars 2026, qui avaient été auparavant évaluées à un prix moyen estimatif de 120,2 $ US/tms. Ainsi, des ajustements de prix provisoires négatifs de 6,2 M$ ont été comptabilisés pour les tonnes auxquelles des prix provisoires avaient été attribués au 31 mars 2026, ce qui représente un impact négatif de 1,3 $ US/tms sur les 3,3 Mtms vendues au cours du trimestre.
Les frais de transport maritime et autres coûts ont totalisé 36,4 $ US/tms durant le trimestre terminé le 30 juin 2026, ce qui représente une hausse de 35 % comparativement aux frais de 26,9 $ US/tms enregistrés à la même période de l'année précédente, reflétant principalement la hausse de 63 % de l'indice C3 moyen. Bien que l'indice C3 ait beaucoup augmenté durant le trimestre, les frais de transport maritime et autres coûts de la Société ont augmenté à un rythme plus mesuré, reflétant l'agilité des stratégies de réservation des navires de la Société, les tarifs de fret favorables négociés en vertu de contrats à prix fixes inférieurs au niveau du marché pour une portion des volumes de ventes, et l'impact positif des mécanismes de tarification rétrospective. La hausse de l'indice C3, alimentée par le conflit en cours au Moyen-Orient, continuera vraisemblablement à affecter les revenus nets de Champion au cours du trimestre se terminant le 30 septembre 2026, puisque la plupart des navires sont réservés de trois à cinq semaines avant la période de disponibilité désirée.
En tenant compte des frais de transport maritime et autres coûts de 36,4 $ US/tms et des ajustements de prix provisoires négatifs de 1,3 $ US/tms, la Société a enregistré un prix de vente moyen réalisé net de 77,5 $ US/tms2 (106,9 $ CA/tms1) pour ses concentrés de minerai de fer de haute pureté expédiés au cours du trimestre terminé le 30 juin 2026.
B. Résultats de la mine du Lac Bloom
Le Lac Bloom effectue l'entretien planifié de ses deux usines en tandem, aux deuxième et quatrième trimestres financiers, ce qui peut générer des variations marquées d'un trimestre à l'autre au niveau de la production et des coûts d'extraction minière et de traitement.
| T1 Exercice 2027 | T4 Exercice 2026 | Variation trimestrielle | T1 Exercice 2026 | Variation annuelle | |||
| Données d'exploitation de la mine | |||||||
| Concentrés de minerai de fer produits (tmh) | 3 547 200 | 3 435 100 | 3 % | 3 520 600 | 1 % | ||
| Concentrés de minerai de fer vendus (tms) | 3 128 800 | 3 455 400 | (9 %) | 3 831 800 | (18 %) | ||
| Ratio de déblaiement | 1,04 | 1,11 | (6 %) | 1,09 | (5 %) | ||
| Teneur d'alimentation (% Fe) | 29,5 | 28,8 | 2 % | 28,2 | 5 % | ||
| Récupération du Fe (%) | 79,0 | 80,6 | (2 %) | 78,2 | 1 % | ||
| Teneur moyenne pondérée des produits (% Fe) | 66,5 | 66,2 | -- % | 66,3 | -- % | ||
| Données financières sélectionnées de la mine (en milliers de dollars) | |||||||
| Produits | 332 980 | 414 505 | (20 %) | 390 027 | (15 %) | ||
| Coût des ventes | 267 504 | 285 785 | (6 %) | 313 928 | (15 %) | ||
| Bénéfice brut | 27 408 | 85 191 | (68 %) | 29 894 | (8 %) | ||
| Statistiques sélectionnées de la mine (en dollars par tms vendue) | |||||||
| Prix de vente moyen réalisé net1 | 106,4 | 120,0 | (11 %) | 101,8 | 5 % | ||
| Coût comptant C11 | 83,4 | 82,7 | 1 % | 81,9 | 2 % | ||
| CMTI1 | 104,4 | 96,9 | 8 % | 93,0 | 12 % |
i. Rendement opérationnel
Le Lac Bloom a produit 3,5 Mtmh de concentrés de minerai de fer de haute pureté au cours du trimestre terminé le 30 juin 2026, un niveau comparable à la même période en 2025, bénéficiant de la teneur plus élevée du minerai extrait et du taux de récupération du fer plus élevé. Le niveau de production trimestriel a été affecté par le processus de mise en service des installations de production RDPB. La production inclut 0,6 Mtmh de concentré produit dans les infrastructures du projet RDPB, avec une qualité de produit qui s'améliore progressivement pour atteindre les spécifications de pureté ciblées dans le cadre du processus de mise en service. Conséquemment, la teneur moyenne pondérée des produits est passée à 66,5 % Fe. Durant le trimestre terminé le 30 juin 2026, le taux de récupération du fer a augmenté à 79,0 % par rapport à 78,2 % lors de la même période en 2025, bénéficiant du rendement accru des systèmes gravimétriques grâce à l'application de programmes de travaux et à l'optimisation des opérations.
Le volume des ventes de concentrés de minerai de fer durant le trimestre terminé le 30 juin 2026 était 18 % plus faible qu'à la même période de l'année précédente, car la période de l'année précédente avait bénéficié d'un volume de ventes élevé en raison des stocks de minerai accumulés. Les ventes de la période courante ont été plombées par des arrêts planifiés pour l'entretien des installations portuaires et ferroviaires tierces, ainsi que par le calendrier des ventes principalement en lien avec la mise en service du projet RDPB. Le cumul des stocks de concentrés de minerai de fer au Lac Bloom et au port totalisait 1,7 Mtmh au 30 juin 2026, comparativement à 1,3 Mtmh au 31 mars 2026. Les stocks de concentrés ont augmenté au cours du trimestre alors que la production a surpassé le volume des ventes, reflétant les dates d'expéditions et les activités de mise en service en lien avec le projet RDPB. Ces stocks devraient assurer une marge de manœuvre opérationnelle et soutenir les futures activités de ventes. Pendant que la Société poursuit la mise en service du projet RDPB, elle continue d'optimiser ses stratégies de gestion des stocks afin de maintenir ses stocks de produits pour vente commerciale à des niveaux adéquats, gérer les stocks de minerai de fer de différentes qualités et améliorer la logistique de production et de vente.
Durant le trimestre terminé le 30 juin 2026, la Société a extrait et transporté 19,8 Mtmh de stériles et de minerai, comparativement à 21,0 Mtmh à la même période de l'année précédente. Le ratio de déblaiement pour le trimestre terminé le 30 juin 2026 s'est établi à 1,04, comparativement au ratio de 1,09 enregistré à la même période de l'année précédente. Champion prévoit maintenir cette cadence de déblaiement lors des périodes à venir, conformément à son plan sur la durée de vie de la mine.
ii. Rendement financier
Le coût des ventes associées aux opérations du Lac Bloom a totalisé 267,5 M$, comparativement à 313,9 M$ à la même période en 2025. Pour le trimestre terminé le 30 juin 2026, les coûts d'extraction minière et de traitement du minerai ont totalisé 54,5 $/tms produite1, ce qui représente une augmentation de 1 % comparativement aux coûts de 53,7 $/tms produite1 à la même période de l'année précédente, principalement attribuable à la hausse des prix pour le carburant en raison du conflit au Moyen-Orient et des prix plus élevés pour les explosifs, en partie compensés par des efforts d'optimisation des coûts. Les coûts de transport terrestre et de manutention portuaire comprennent des composantes fixes et variables, et sont grandement influencés par les volumes transportés de Fermont jusqu'au port de Sept-Îles. Les coûts de transport terrestre et de manutention portuaire pour le trimestre terminé le 30 juin 2026 se sont établis à 30,6 $/tms vendue1, en hausse de 26 % par rapport à la période comparative de l'année précédente, reflétant principalement le volume des ventes plus bas. Le coût des ventes a aussi été affecté par les variations de l'évaluation des stocks de concentrés de minerai de fer, qui tient compte des coûts d'extraction minière et de traitement du minerai engagés au trimestre précédent, ainsi que par les variations des volumes de production et de ventes. Conséquemment, le coût comptant C1 du Lac Bloom a totalisé 83,4 $/tms1, comparativement à 81,9 $/tms1 pour la même période en 2025. Le coût comptant C1 exclut les coûts de démarrage du projet RDPB, qui englobent principalement des coûts opérationnels inhabituels engagés pendant que l'usine progresse vers la production commerciale.
Malgré les volumes d'expéditions plus faibles, le bénéfice brut est resté relativement stable à 27,4 M$ pour le trimestre terminé le 30 juin 2026, comparativement à 29,9 M$ à la même période en 2025. Cela reflète principalement les prix de vente réalisés plus élevés et l'impact des variations de l'évaluation des stocks, qui ont en partie compensé l'impact des volumes de ventes plus faibles.
Le CMTI a totalisé 104,4 $/tms1 pour le trimestre terminé le 30 juin 2026, comparativement à 93,0 $/tms1 à la même période de l'année précédente. L'augmentation du CMTI reflète principalement les volumes d'expéditions plus faibles et les dépenses en immobilisations de maintien plus élevées, attribuables à l'expansion de la capacité d'entreposage du parc à résidus en lien avec le plan d'investissement à long terme de la Société au Lac Bloom, aux dépenses liées à la réfection de l'équipement minier, et aux initiatives de développement minier en cours, notamment les travaux de forage topographique et de prédécoupage. Le calendrier de réalisation des travaux de maintien planifiés pour l'exercice financier en cours a aussi fait en sorte qu'une proportion plus importante des dépenses de maintien a été engagée durant le premier trimestre.
C. Résultats de la mine Rana Gruber
Toute comparaison des coûts unitaires entre les différents secteurs d'exploitation de Champion doit être interprétée en tenant compte des différences dans les méthodes de production, les opérations de traitement et les infrastructures logistiques de chaque site. Compte tenu de la distance de transport ferroviaire beaucoup plus courte que celle du Lac Bloom, la structure de coût de Rana Gruber comporte une part beaucoup plus petite attribuable au transport terrestre et à la manipulation portuaire, tandis qu'une proportion plus importante des coûts est engagée dans le cadre des activités d'extraction minière et de traitement du minerai.
Les résultats de Rana Gruber présentés ci-dessous ont été consolidés à compter de la date d'acquisition du 10 avril 2026 et représentent donc moins qu'un trimestre complet d'exploitation.
| T1 Exercice 2027 | ||
| Données d'exploitation de la mine | ||
| Concentrés de minerai de fer produits (tmh) | 392 200 | |
| Concentrés de minerai de fer vendus (tms) | 210 200 | |
| Ratio de déblaiement à ciel ouvert | 2,00 | |
| Teneur d'alimentation (% Fe) | 31,7 | |
| Récupération du Fe (%) | 75,3 | |
| Teneur moyenne pondérée des produits (% Fe) | 65,2 | |
| Données financières sélectionnées de la mine (en milliers de dollars) | ||
| Produits | 23 896 | |
| Coût des ventes | 21 247 | |
| Perte brute | (5 989) | |
| Statistiques sélectionnées de la mine (en dollars par tms vendue) | ||
| Prix de vente moyen réalisé net1 | 113,7 | |
| Coût comptant C11 | 87,5 | |
| CMTI1 | 147,0 |
i. Rendement opérationnel
Rana Gruber a produit 0,4 Mtmh de concentrés de minerai de fer de haute pureté à une teneur moyenne pondérée de 65,2 % Fe depuis la date d'acquisition du 10 avril 2026. Après ajustement afin de refléter un trimestre complet d'exploitation, la production était conforme à la capacité nominale de Rana Gruber en tenant compte de l'arrêt annuel pour l'entretien qui a habituellement lieu en juin. La production a bénéficié d'un débit de traitement stable à l'usine de 1,0 Mtmh à une teneur d'alimentation moyenne pondérée de 31,7 % Fe avec un taux de récupération du fer de 75,3 %.
Les concentrés de minerai de fer vendus ont totalisé 0,2 Mtms depuis la date d'acquisition et sont restés nettement inférieurs aux niveaux de production, incluant sur une base équivalente à un trimestre complet, reflétant principalement les dates des expéditions. Par conséquent, les stocks de concentrés de minerai de fer accumulés ont augmenté à 0,4 Mtmh au cours du trimestre et restaient à des niveaux élevés au 30 juin 2026. La direction continue de mettre l'accent sur la réduction des stocks accumulés au fil du temps en optimisant les occasions de ventes.
ii. Rendement financier
Le coût des ventes a totalisé 21,2 M$ pour le trimestre, en incluant les coûts d'extraction minière et de traitement du minerai de 31,2 M$, les coûts de transport terrestre et de manutention portuaire de 0,6 M$ et un ajustement des stocks lié à la répartition du prix d'achat de 2,9 M$, en partie compensés par une variation de 13,5 M$ des stocks de concentrés de minerai de fer accumulés. Les coûts de manutention sont en grande partie inclus dans les coûts d'extraction minière et de traitement du minerai, tandis que des coûts de transport terrestre limités sont engagés avant l'expédition, de telle sorte que les coûts de transport terrestre et de manutention portuaire s'élèvent à 2,8 $/tms vendue1. Les coûts d'extraction minière et de traitement du minerai ont totalisé 85,7 $/tms produite¹, tandis que le coût comptant C1 s'est élevé à 87,5 $/tms vendue1, soit plus élevé que les niveaux historiques. Le coût comptant total C1 plus élevé était attribuable à plusieurs facteurs, dont une augmentation des coûts d'extraction minière souterraine découlant de la hausse des prix pour les explosifs et d'enjeux opérationnels temporaires en lien avec la ventilation et la gestion de l'eau. Par ailleurs, les coûts d'extraction minière à ciel ouvert ont été affectés par l'accroissement des activités de halage des roches stériles dans la nouvelle fosse mise en service en janvier 2026, ainsi que par les prix plus élevés pour le carburant diésel. Le coût comptant C1 exclut l'ajustement des stocks lié à la répartition du prix d'achat, puisqu'il reflète une augmentation de la juste valeur des stocks comptabilisés dans le cadre de l'acquisition de Rana Gruber et n'est pas représentatif des coûts opérationnels sous-jacents liés à la production et à la vente de concentrés de minerai de fer.
La perte brute a totalisé 6,0 M$ pour le trimestre terminé le 30 juin 2026 et découle principalement des faibles volumes d'expéditions, du mélange de produits d'hématite et de magnétite vendu au cours de la période, du coût des ventes plus élevé et de l'ajustement des stocks lié à la répartition du prix d'achat de 2,9 M$.
Le CMTI a totalisé 147,0 $/tms1 pour le trimestre terminé le 30 juin 2026, reflétant les dépenses en immobilisations de maintien plus élevées attribuables au développement d'un nouveau niveau d'exploitation minière souterraine incluant les infrastructures associées et d'autres activités de développement minier, combiné à l'impact défavorable du volume de ventes réduit.
D. Résultat net (perte nette) et BAIIA
Pour le trimestre terminé le 30 juin 2026, la Société a subi une perte nette de 41,5 M$ (perte par action de 0,07 $), comparativement à un résultat net de 23,8 M$ (BPA de 0,05 $) à la même période de l'année précédente. La perte nette est principalement attribuable à une perte de change latente de 17,2 M$ sur des passifs monétaires nets libellés en devises étrangères, ainsi qu'aux variations défavorables de la juste valeur de 17,6 M$ sur des instruments dérivés.
Pour le trimestre terminé le 30 juin 2026, la Société a généré un BAIIA de 32,8 M$1, ce qui représente une marge BAIIA de 9 %1, comparativement à 57,8 M$1, ce qui représente une marge BAIIA de 15 %1, pour la même période en 2025. Le BAIIA et la marge BAIIA plus faibles reflètent principalement la variation défavorable de la juste valeur des instruments dérivés mentionnée précédemment, les coûts de démarrage du projet RDPB de 6,6 M$ et les ajustements de valorisation d'inventaire liés à l'acquisition de Rana Gruber de 2,9 M$.
E. Coût de maintien tout inclus et marge d'exploitation
Pour le trimestre terminé le 30 juin 2026, la Société a enregistré un CMTI de 111,3 $/tms1, comparativement à 96,2 $/tms1 à la même période en 2025. Cette augmentation reflète principalement les dépenses en immobilisations de maintien et le coût comptant plus élevés, combinés aux volumes plus faibles de concentrés de minerai de fer vendus.
La Société a généré une marge d'exploitation négative de 4,4 $/tms1 pour chaque tonne de concentré de minerai de fer de haute pureté vendue au cours du trimestre terminé le 30 juin 2026, comparativement à une marge d'exploitation positive de 5,6 $/tms1 à la même période de l'année précédente. Cette diminution reflète principalement le CMTI plus élevé, en partie compensé par le prix de vente moyen réalisé net plus élevé.
3. Activités d'exploration
Durant le trimestre terminé le 30 juin 2026, la Société a maintenu toutes ses propriétés en règle et n'a conclu aucune entente d'option. Durant le trimestre terminé le 30 juin 2026, des dépenses d'exploration et d'évaluation de 1,9 M$ ont été engagées, comparativement à 8,8 M$ pour la même période de l'année précédente. La diminution des dépenses d'une année à l'autre reflète le transfert des propriétés Kami au partenariat Kami, et l'acquisition par les partenaires d'une participation globale de 49 % dans le partenariat en septembre 2025.
Les dépenses d'exploration et d'évaluation étaient liées à des activités canadiennes effectuées au Québec et à Terre-Neuve-et-Labrador. De plus amples détails sur les projets d'exploration, ainsi que des cartes, sont disponibles sur le site Web de la Société à l'adresse www.championiron.com à la section Opérations et Projets . Les informations présentées sur le site Web de la Société ne sont pas intégrées par renvoi au présent communiqué de presse.
4. Flux de trésorerie -- Achats d'immobilisations corporelles
| Trois mois terminés | ||||
| le 30 juin | ||||
| (en milliers de dollars) | 2026 | 2025 | ||
| Infrastructures de gestion des résidus miniers et de l'eau | 20 821 | 14 766 | ||
| Activités de déblaiement et d'extraction minière | 21 636 | 12 975 | ||
| Excavation de tunnels et infrastructures souterraines | 3 782 | -- | ||
| Autres dépenses en immobilisations de maintien | 31 965 | 14 500 | ||
| Dépenses en immobilisations de maintien | 78 204 | 42 241 | ||
| Projet RDPB | 14 218 | 47 460 | ||
| Autres dépenses en immobilisations de développement | 8 499 | 15 674 | ||
| Achats d'immobilisations corporelles portés aux flux de trésorerie | 100 921 | 105 375 |
Dépenses en immobilisations de maintien
Les investissements consentis pour le parc à résidus au cours du trimestre terminé le 30 juin 2026 s'inscrivent dans le cadre du plan à long terme de MFQ visant à soutenir les opérations sur la durée de vie de la mine. Champion reste fidèle à sa stratégie de gestion sécuritaire des résidus miniers et continue de mettre en œuvre son plan d'investissement à long terme relatif au Lac Bloom en misant sur la réalisation d'inspections régulières et une surveillance constante des infrastructures de son parc à résidus. Les activités de construction dans le parc à résidus sont typiquement effectuées entre mai et novembre, lorsque les conditions météorologiques sont les plus favorables au Lac Bloom.
Les activités de déblaiement et d'extraction minière pour le trimestre terminé le 30 juin 2026 comprenaient 17,8 M$ de coûts de développement minier, incluant du forage topographique et de prédécoupage, dont les détails figurent dans le plan d'exploitation minière de la Société (7,8 M$ à la même période en 2025). Durant le trimestre terminé le 30 juin 2026, les activités de déblaiement et d'extraction minière incluaient également un montant de 3,8 M$ en frais de déblaiement capitalisés (5,2 M$ à la même période en 2025).
Les dépenses liées à l'excavation de tunnels et aux infrastructures souterraines se rapportent à Rana Gruber et comprennent des travaux sur la rampe d'accès et d'autres infrastructures souterraines.
Les autres dépenses en immobilisations de maintien pour le trimestre terminé le 30 juin 2026 comprenaient des dépenses en lien avec les programmes de réfection de l'équipement minier. Ces dépenses s'inscrivent dans la stratégie d'investissement à long terme de la Société visant à soutenir les initiatives de croissance sur la durée de vie de la mine.
Projet RDPB
Au cours du trimestre terminé le 30 juin 2026, la Société a investi 14,2 M$ en dépenses d'immobilisations dans le cadre du projet RDPB (47,5 M$ à la même période de l'année précédente). La diminution reflète le fait que les activités de construction étaient en grande partie achevées, les investissements consentis au cours de la période étant principalement associés aux activités de mise en service et de montée en cadence. Les investissements cumulatifs totalisaient 493,7 M$ au 30 juin 2026.
Autres dépenses en immobilisations de développement
Pour le trimestre terminé le 30 juin 2026, les autres dépenses en immobilisations de développement ont totalisé 8,5 M$ (15,7 M$ à la même période en 2025) et sont présentées plus en détail ci-dessous :
| Trois mois terminés | |||
| le 30 juin | |||
| (en milliers de dollars) | 2026 | 2025 | |
| Améliorations et mises à niveau d'infrastructures (i) | 6 017 | 3 019 | |
| Expansion du garage d'entretien de la mine | -- | 457 | |
| Dépôts ou paiements finaux pour de l'équipement minier | 21 | 6 219 | |
| Autres (ii) | 2 461 | 5 979 | |
| Autres dépenses en immobilisations de développement | 8 499 | 15 674 |
| (i) | Les dépenses liées aux améliorations et aux mises à niveau d'infrastructures englobent différents projets d'investissement visant à améliorer la performance ou la capacité des actifs et à se conformer aux diverses règlementations régissant les pratiques d'exploitation minière. |
| (ii) | Les autres dépenses comprennent des coûts d'emprunt capitalisés dans le cadre du projet RDPB et la construction de nouveaux puits de ventilation en lien avec les infrastructures souterraines à Rana Gruber. |
5. Informations relatives à la conférence téléphonique et à sa webdiffusion
Une webdiffusion et une conférence téléphonique au cours desquelles les résultats ci-dessus seront abordés plus en détail auront lieu le 30 juillet 2026 à 9 h (heure de Montréal) / 23 h (heure de Sydney). Les auditeurs pourront suivre une webdiffusion en direct de la conférence téléphonique à la section Investisseurs du site Web de la Société à l'adresse www.championiron.com/investisseurs/evenements-presentations ou en composant sans frais le +1-888-699-1199 en Amérique du Nord ou le +61-2-8017-1385 en Australie.
La webdiffusion sera archivée en ligne à des fins de consultation et sera disponible sur le site Web de la Société à l'adresse www.championiron.com/investisseurs/evenements-presentations . Une rediffusion téléphonique sera également disponible dans la semaine suivant la conférence téléphonique, en composant le +1-888-660-6345 en Amérique du Nord ou le +1-289-819-1450 outremer, puis en composant le code d'accès 84810#.
À propos de Champion Iron Limited
Champion est un producteur de minerai de fer de haute pureté, avec des activités au Canada et en Norvège. Par l'entremise de Minerai de fer Québec inc., Champion détient et exploite le complexe minier du Lac Bloom situé à l'extrémité sud de la Fosse du Labrador, à environ 13 kilomètres au nord de Fermont, Québec. La mine du Lac Bloom est une mine à ciel ouvert avec deux usines de concentration qui s'alimentent principalement en énergie hydroélectrique renouvelable, ayant une capacité nominale combinée de 15 millions de tonnes métriques humides par année. Les deux usines de concentration produisent des concentrés de minerai de fer de haute pureté avec de faibles teneurs en contaminants et ont prouvé leur capacité à produire un concentré de qualité supérieure destiné à la réduction directe. Le concentré de minerai de fer du Lac Bloom est expédié par rail jusqu'au port de chargement situé à Sept-Îles, Québec. Bénéficiant de l'une des ressources les plus pures au monde, Champion met en œuvre un programme de travaux pour être en mesure de convertir jusqu'à la moitié de la capacité de la mine du Lac Bloom afin de produire du matériel de qualité réduction directe pour boulettes pouvant atteindre 69 % Fe. Les produits de minerai de fer de haute pureté et à plus faible teneur en contaminants du Lac Bloom ont su se mériter une prime par rapport à l'indice P61 (anciennement, l'indice P62). Champion détient et exploite également Rana Gruber, un producteur norvégien de minerai de fer établi à Mo i Rana, Nordland. Avec une production continue depuis les années 1960, Rana Gruber produit environ 1,8 million de tonnes métriques sèches par année de concentrés de minerai de fer d'hématite et de magnétite. Champion a livré ses concentrés de minerai de fer à l'échelle mondiale, notamment en Chine, au Japon, au Moyen-Orient, en Europe, en Corée du Sud, en Inde, en Asie du Sud-est, en Afrique du Nord et au Canada. En plus de ses mines en production, Champion détient une participation de 51 % dans Kami Iron Mine Partnership, en partenariat avec Nippon Steel Corporation et Sojitz Corporation, par l'intermédiaire duquel le projet Kami est détenu. Situé à environ 21 kilomètres au sud-est du Lac Bloom, le projet bénéficie d'un accès aux infrastructures existantes. Champion détient également un portefeuille de projets d'exploration et de développement dans la Fosse du Labrador, incluant les propriétés Cluster II, situées à moins de 60 kilomètres au sud du Lac Bloom.
Mise en garde à propos des énoncés prospectifs
Le présent communiqué de presse contient de l'information et des énoncés qui peuvent constituer de l'« information prospective » aux termes de la législation sur les valeurs mobilières applicable (des « énoncés prospectifs »). Les énoncés prospectifs sont des énoncés qui ne sont pas des faits historiques et qui sont généralement, mais pas toujours, identifiés par l'emploi de termes comme « sera », « planifie », « s'attend à », « budgète », « est prévu », « estime », « continue », « prévoit », « projette », « prédit », « a l'intention de », « anticipe », « vise », « cible » ou « est d'avis », ou toute variation de ces termes, y compris leurs négatifs, ou des énoncés à l'effet que certaines actions et certains événements ou résultats « peuvent », « doivent », « pourraient », « devraient », « pourront » ou « devront » survenir, se réaliser ou être entrepris. Les énoncés prospectifs comportent des risques inhérents, des incertitudes et d'autres facteurs qui ne peuvent être prédits ni contrôlés par la Société.
Énoncés prospectifs spécifiques
Tous les énoncés autres que les énoncés de faits historiques compris dans le présent communiqué de presse, qui concernent des événements futurs, des développements ou des réalisations que Champion s'attend, anticipe ou est d'avis qu'ils pourraient se réaliser ou qu'ils se réaliseront, sont des énoncés prospectifs. Les énoncés prospectifs peuvent comprendre, entre autres choses, les attentes de la direction concernant : (i) la durée de vie de la mine du Lac Bloom, le plan d'investissement à long terme et les efforts visant à améliorer les taux de récupération et la production, la capacité nominale et les occasions et avantages associés; (ii) le projet visant à valoriser le concentré de minerai de fer du Lac Bloom à un degré de pureté plus élevé et à convertir près de la moitié de la capacité minière accrue du Lac Bloom afin de produire du minerai de fer destiné à la réduction directe pour bouletage (le projet RDPB), l'échéancier de réalisation anticipé du projet RDPB, les gains d'efficacité, les retombées économiques et autres, les discussions connexes avec des clients potentiels et les attentes à l'égard de ces derniers, les expéditions commerciales de minerai de fer prévues et leur impact sur la production, les ventes et les résultats financiers et les dates de ces différents éléments; (iii) le partenariat Kami et la capacité de Champion de réaliser les avantages de la transaction Kami avec les partenaires; (iv) l'acquisition de Rana Gruber, y compris les attentes concernant l'intégration de Rana Gruber, et la capacité de Champion de réaliser les avantages anticipés de l'acquisition de Rana Gruber; (v) le changement des méthodes de production de l'industrie sidérurgique, la croissance prévue de la demande mondiale pour des produits de minerai de fer à plus haute pureté et de fer préréduit (DRI), ainsi que le déficit de marché et les primes plus élevées qui s'en suivent, et la participation de la Société à ces efforts, sa contribution aux résultats et son positionnement en lien avec ces éléments, incluant la transition de l'offre de produits de la Société (y compris la production de produits RDPB de haute pureté), son expansion géographique, l'élargissement de ses marchés et de sa clientèle, les investissements connexes ainsi que les avantages attendus; (vi) le maintien d'activités de déblaiement accrues; (vii) les stratégies de gestion des stocks de minerai y compris le mélange des produits, le stockage à court terme et la réduction des stocks accumulés à Rana Gruber; (viii) la stratégie de gestion sécuritaire des résidus miniers de la Société et son plan d'investissement relatif aux résidus miniers, les programmes de réfection de l'équipement minier; (ix) l'impact des taux de change sur les prix des matières premières et sur les résultats financiers de la Société; (x) le lien entre les prix pour le minerai de fer et les frais de transport maritime (y compris les perspectives quant à l'indice C3) et l'impact sur la Société; (xi) l'impact des fluctuations des prix pour le minerai de fer sur la Société et ses résultats financiers et la survenance de certains événements et leur impact sur les prix pour le minerai de fer et la demande pour des produits de minerai de fer de haute pureté; (xii) les prix des produits de la Société (y compris les prix provisoires); (xiii) les tendances observées entre les prix pour les concentrés de minerai de fer de la Société et l'indice P65; (xiv) les liquidités disponibles et la marge de manœuvre financière de la Société; (xv) l'avis de la Société concernant les mesures non conformes aux IFRS et les autres mesures financières, y compris l'utilité de ces mesures permettant aux investisseurs de mieux comprendre les résultats de la Société et sa capacité à générer des résultats d'exploitation, de comparer les résultats d'exploitation entre les périodes, d'évaluer le rendement des activités de la Société, d'évaluer ses liquidités et ses flux de trésorerie servant à financer ses besoins en fonds de roulement et ses dépenses d'investissement et assurer le service de la dette; (xvi) l'avis de la Société concernant la conformité aux lois et aux règlements applicables, notamment le fait que la Société dispose de tous les permis, licences et approbations requis pour exercer ses activités; et (xvii) les initiatives stratégiques et de croissance et les opportunités de la Société en général, ainsi que leur potentiel d'optimisation des rendements pour les actionnaires, de création de valeur pour les parties prenantes et de renforcement du leadership de la Société dans l'industrie du minerai de fer de haute pureté.
Risques
Bien que la Société croie que les attentes exprimées dans ces énoncés prospectifs sont basées sur des hypothèses raisonnables, de tels énoncés prospectifs sont sujets à des risques, incertitudes et autres facteurs connus et inconnus, dont la plupart sont hors du contrôle de la Société, ce qui peut faire en sorte de faire varier substantiellement les résultats, performances ou accomplissements réels de la Société par rapport à ceux qui sont exprimés ou sous-entendus dans ces énoncés prospectifs. Des facteurs susceptibles de causer de telles variations entre les résultats réels et ceux indiqués dans les énoncés prospectifs incluent, sans s'y limiter : (i) les prix du minerai de fer; (ii) les prix de l'énergie; (iii) les coûts d'exploitation; (iv) les coûts de transport; (v) les incertitudes générales économiques, concurrentielles, politiques et sociales; (vi) la disponibilité continue de capital et de financement ainsi que l'état général de l'économie, du marché et des affaires; (vii) le moment et l'incertitude du passage de l'industrie sidérurgique vers de nouvelles méthodes de production, et l'impact sur la demande pour du matériel d'alimentation à haute pureté; (viii) des défaillances des usines, des équipements ou des processus à opérer comme prévu, y compris ceux des fournisseurs tiers ou des contreparties; (ix) des retards dans l'obtention d'approbations gouvernementales, des permis nécessaires ou dans l'achèvement d'activités de développement ou de construction; (x) les résultats des études de faisabilité; (xi) les changements aux hypothèses utilisées dans le cadre des études de faisabilité; (xii) les délais dans les projets; (xiii) les événements géopolitiques; et (xiv) les effets de catastrophes et de crises de santé publique sur l'économie mondiale, le marché du minerai de fer et les opérations de Champion, ainsi que les facteurs traités dans la section sur les facteurs de risque du rapport de gestion de la Société pour l'exercice financier terminé le 31 mars 2026, disponible sous le profil de la Société auprès de l'ASX à l'adresse www.asx.com.au , sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à l'adresse www.championiron.com .
Rien ne garantit que l'un ou l'autre des énoncés prospectifs se révélera exact, les résultats réels et les événements futurs pouvant être sensiblement différents de ceux prévus dans les énoncés prospectifs. Les lecteurs ne doivent donc pas se fier outre mesure aux énoncés prospectifs.
Mises à jour ultérieures
Tous les énoncés prospectifs dans le présent communiqué de presse sont donnés en date des présentes ou à toute autre date spécifiée dans les énoncés prospectifs et sont fondés sur les jugements et les estimations de la direction de Champion et sur l'information dont la direction dispose à la date des présentes. Champion décline toute intention ou obligation de mettre à jour ou de réviser ses énoncés prospectifs, notamment à la lumière de nouveaux renseignements ou d'événements futurs, à moins que la législation ne l'y oblige. Si la Société publie une mise à jour de l'un ou de plusieurs des énoncés prospectifs, l'on ne doit pas supposer que d'autres mises à jour suivront à propos de ces énoncés prospectifs ou d'autres énoncés prospectifs. Champion met en garde le lecteur à l'effet que la liste de risques et d'incertitudes ci-dessus n'est pas exhaustive. Les lecteurs devraient considérer les facteurs ci-dessus avec attention, ainsi que les incertitudes qu'ils représentent et les risques qu'ils comportent.
Abréviations
Sauf indication contraire, tous les montants en dollars indiqués dans les présentes sont libellés en dollars canadiens. Les abréviations suivantes sont utilisées tout au long de ce communiqué de presse : $ US (dollar américain), Fe (fer), tmh (tonne métrique humide), tms (tonne métrique sèche), M (million), km (kilomètre), Lac Bloom ou mine du Lac Bloom (complexe minier du Lac Bloom), mine Rana Gruber (complexe minier de Mo i Rana), RD (réduction directe), RDPB (réduction directe pour bouletage), projet Kami (projet Kamistiatusset), indice C3 (indice Capesize C3 de la bourse baltique), indice P61 (indice Platts IODEX CFR Chine pour le minerai de fer à 61 % Fe), indice P62 (indice Platts IODEX CFR Chine pour le minerai de fer à 62 % Fe), indice P65 (indice Platts IODEX CFR Chine pour le minerai de fer à 65 % Fe), BAIIA (bénéfice avant les impôts sur le revenu et les impôts miniers, les charges financières nettes et l'amortissement) et BPA (bénéfice par action). L'utilisation de « Champion » ou de la « Société » fait référence à Champion Iron Limited et/ou à l'une ou plusieurs ou toutes ses filiales, selon le cas, et « IFRS » fait référence aux Normes internationales d'information financière telles qu'émises par l'International Accounting Standards Board.
Pour plus de renseignements sur Champion Iron Limited, veuillez visiter notre site Web à l'adresse : www.championiron.com .
La diffusion du présent communiqué de presse a été autorisée par le conseil d'administration.
Les états financiers consolidés résumés non audités de la Société et le rapport de gestion connexe pour le trimestre terminé le 30 juin 2026 sont disponibles sous le profil de la Société auprès de l'ASX (www.asx.com.au ), sur SEDAR+ (www.sedarplus.ca ) et sur le site Web de la Société (www.championiron.com ) à compter du 30 juillet 2026.
| ___________________________________ | |
| 1 | Il s'agit d'une mesure financière ou d'un ratio non conforme aux IFRS, ou d'une autre mesure financière. La mesure n'est pas une mesure financière standardisée en vertu du cadre de présentation de l'information financière utilisé pour préparer les états financiers et pourrait ne pas être comparable à des mesures financières similaires utilisées par d'autres émetteurs. Se reporter à la section ci-dessous -- Mesures non conformes aux IFRS et autres mesures financières, pour les définitions de ces mesures et un rapprochement avec la mesure conforme aux IFRS la plus directement comparable, le cas échéant. D'autres détails sur ces mesures non conformes aux IFRS et autres mesures financières ont été intégrés par renvoi et peuvent être consultés à la rubrique 20 du rapport de gestion de la Société pour le trimestre terminé le 30 juin 2026, disponible auprès de l'ASX à l'adresse www.asx.com.au, sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à la section Investisseurs à l'adresse www.championiron.com. |
| 2 | Se reporter à la rubrique 6 du rapport de gestion pour le trimestre terminé le 30 juin 2026, disponible auprès de l'ASX à l'adresse www.asx.com.au, sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à la section Investisseurs à l'adresse www.championiron.com. |
Mesures non conformes aux IFRS et autres mesures financières
La Société a inclus certaines mesures financières et ratios non conformes aux IFRS et d'autres mesures financières dans le présent communiqué de presse afin d'offrir aux investisseurs de l'information additionnelle leur permettant d'évaluer le rendement sous-jacent de la Société. Ces mesures sont principalement tirées des états financiers, mais n'ont pas de définition officielle en vertu des IFRS et pourraient donc ne pas être comparables à des mesures similaires présentées par d'autres sociétés. La direction est d'avis que ces mesures, en plus des mesures conventionnelles préparées conformément aux IFRS, permettent aux investisseurs de mieux comprendre les résultats des activités de la Société. Les mesures non conformes aux IFRS et les autres mesures financières ne devraient pas être considérées isolément ou comme substituts aux mesures de rendement préparées conformément aux IFRS. L'exclusion de certains éléments des mesures financières non conformes aux IFRS n'implique pas nécessairement que ces éléments ne sont pas récurrents. Les mesures de rendement par site minier devraient être analysées conjointement avec les informations sectorielles figurant à la note 25 des états financiers.
La Société présente certaines de ses mesures non conformes aux IFRS et de ses autres mesures financières en dollars américains et en dollars canadiens, afin de faciliter la comparaison avec les mesures présentées par d'autres sociétés.
BAIIA et marge BAIIA
| (en milliers de dollars) | T1 Exercice 2027 | T4 Exercice 2026 | T1 Exercice 2026 | |
| Bénéfice (perte) avant les impôts sur le revenu et les impôts miniers | (50 312) | 51 078 | 24 213 | |
| Charges financières nettes (produit) | 35 861 | 19 733 | (13 256) | |
| Amortissement | 47 241 | 43 529 | 46 796 | |
| BAIIA | 32 790 | 114 340 | 57 753 | |
| Produits | 356 876 | 414 505 | 390 027 | |
| Marge BAIIA | 9 % | 28 % | 15 % |
Liquidités disponibles
| Au 30 juin | Au 31 mars | |||
| (en milliers de dollars) | 2026 | 2026 | ||
| Trésorerie | 198 621 | 296 788 | ||
| Montants disponibles en vertu des facilités de crédit | 454 516 | 515 600 | ||
| Liquidités disponibles | 653 137 | 812 388 |
Coût comptant C1
| T1 Exercice 2027 | T4 Exercice 2026 | T1 Exercice 2026 | ||
| Concentrés de minerai de fer vendu (tms) | 3 339 000 | 3 455 400 | 3 831 800 | |
| (en milliers de dollars, sauf les montants par tms) | ||||
| Coût des ventes | 288 751 | 285 785 | 313 928 | |
| Moins : Ajustement des stocks lié à la répartition du prix d'achat | (2 865) | -- | -- | |
| Moins : Coûts de démarrage | (6 551) | -- | -- | |
| 279 335 | 285 785 | 313 928 | ||
| Coût comptant C1 (par tms vendue) | 83,7 | 82,7 | 81,9 |
Coût de maintien tout inclus
| T1 Exercice 2027 | T4 Exercice 2026 | T1 Exercice 2026 | ||
| Concentrés de minerai de fer vendus (tms) | 3 339 000 | 3 455 400 | 3 831 800 | |
| (en milliers de dollars, sauf les montants par tms) | ||||
| Coût des ventes | 288 751 | 285 785 | 313 928 | |
| Moins : Ajustement des stocks lié à la répartition du prix d'achat | (2 865) | -- | -- | |
| Moins : Coûts de démarrage | (6 551) | -- | -- | |
| Dépenses en immobilisations de maintien | 78 204 | 31 162 | 42 241 | |
| Dépenses générales et administratives | 14 185 | 17 836 | 12 581 | |
| 371 724 | 334 783 | 368 750 | ||
| CMTI (par tms vendue) | 111,3 | 96,9 | 96,2 |
Marge d'exploitation et marge bénéficiaire
| T1 Exercice 2027 | T4 Exercice 2026 | T1 Exercice 2026 | ||
| Concentrés de minerai de fer vendus (tms) | 3 339 000 | 3 455 400 | 3 831 800 | |
| (en milliers de dollars, sauf les montants par tms) | ||||
| Produits | 356 876 | 414 505 | 390 027 | |
| Prix de vente moyen réalisé net (par tms vendue) | 106,9 | 120,0 | 101,8 | |
| CMTI (par tms vendue) | 111,3 | 96,9 | 96,2 | |
| Marge d'exploitation (par tms vendue) | (4,4) | 23,1 | 5,6 | |
| Marge bénéficiaire | (4 %) | 19 % | 6 % |
Prix de vente moyen réalisé brut par tms vendue
| T1 Exercice 2027 | T4 Exercice 2026 | T1 Exercice 2026 | |
| Concentrés de minerai de fer vendus (tms) | 3 339 000 | 3 455 400 | 3 831 800 |
| (en milliers de dollars, sauf les montants par tms) | |||
| Produits | 356 876 | 414 505 | 390 027 |
| Ajustements de prix provisoires | 6 205 | 299 | 26 552 |
| Frais de transport maritime et autres coûts | 166 982 | 155 844 | 142 687 |
| Produits bruts | 530 063 | 570 648 | 559 266 |
| Prix de vente moyen réalisé brut (par tms vendue) | 158,7 | 165,1 | 146,0 |
Coût comptant et CMTI par site minier
| T1 - Exercice 2027 | T1 - Exercice 2026 | ||||||
| Lac Bloom | Rana Gruber | Consolidé | Lac Bloom | Rana Gruber | Consolidé | ||
| Concentrés de minerai de fer vendus (tms) | 3 128 800 | 210 200 | 3 339 000 | 3 831 800 | -- | 3 831 800 | |
| Concentrés de minerai de fer produits (tms) | 3 437 500 | 364 700 | 3 802 200 | 3 412 300 | -- | 3 412 300 | |
| (en milliers de dollars, sauf les montants par tonne) | |||||||
| Coûts d'extraction minière et de traitement du minerai | 187 287 | 31 237 | 218 524 | 183 217 | -- | 183 217 | |
| Variation des stocks de concentrés de minerai de fer | (22 028) | (13 450) | (35 478) | 37 539 | -- | 37 539 | |
| Coûts de transport terrestre et de manutention portuaire | 95 694 | 595 | 96 289 | 93 172 | -- | 93 172 | |
| Ajustement des stocks lié à la répartition du prix d'achat | -- | 2 865 | 2 865 | -- | -- | -- | |
| Coûts de démarrage | 6 551 | -- | 6 551 | -- | -- | -- | |
| Coût des ventes (en dollars) | 267 504 | 21 247 | 288 751 | 313 928 | -- | 313 928 | |
| Moins : Ajustement des stocks lié à la répartition du prix d'achat | -- | (2 865) | (2 865) | -- | -- | -- | |
| Moins : Coûts de démarrage | (6 551) | -- | (6 551) | -- | -- | -- | |
| Coût comptant total (en dollars) | 260 953 | 18 382 | 279 335 | 313 928 | -- | 313 928 | |
| Plus : Dépenses en immobilisations de maintien | 65 696 | 12 508 | 78 204 | 42 241 | -- | 42 241 | |
| Plus : Dépenses générales et administratives | -- | -- | 14 185 | -- | -- | 12 581 | |
| CMTI (en dollars) | 326 649 | 30 890 | 371 724 | 356 169 | -- | 368 750 | |
| Coûts d'extraction minière et de traitement du minerai (par tms produite) | 54,5 | 85,7 | 57,5 | 53,7 | -- | 53,7 | |
| Coûts de transport terrestre et de manutention portuaire (par tms vendue) | 30,6 | 2,8 | 28,8 | 24,3 | -- | 24,3 | |
| Coût comptant total (par tms vendue) | 83,4 | 87,5 | 83,7 | 81,9 | -- | 81,9 | |
| CMTI (par tms vendue) | 104,4 | 147,0 | 111,3 | 93,0 | -- | 96,2 |
SOURCE Champion Iron Limited

Pour plus de renseignements: Pour nous joindre : [email protected]
[Champion Iron s'engage dans des projets performants,
à faible impact environnemental.
---------------------------------------------------------------------------------------
\
Investissez dans l'avenir brillant des mines\
‘Voir notre plus récent rapport d'activité»
](https://www.championiron.com/investisseurs/telecharger-le-guide-de-linvestisseur/?lang=fr)
Inscrivez-vous à l’infolettre Champion Iron
Voir tous les prix du marché »
Voir tous les prix du marché »
Siège social
Montréal
1155 René-Lévesque West
Suite 3300
Montréal QC H3B 3X7
Tél.: +1 514 316 4858
Téléc.: +1 514 871 8270
Australie
91, Evans Street
Rozelle NSW 2039
Tél.: +61 2 98107816
Téléc.: +61 2 86555017
Toronto
20, Adelaide Street East
Suite 200
Toronto ON M5C 2T6
Tél.: +1 416 866-2200
Sans frais (Amérique du Nord) :
+1 877 448-2201
Téléc.: +1 416 361-1333
Inscrivez-vous à l’infolettre Champion Iron pour suivre notre croissance
×
(opens in a new window)
Press Releases
Consult our newsletters (PDF) »
CHAMPION IRON REPORTS ITS FY2027 FIRST QUARTER RESULTS
-
Quarterly production of 3.9M wmt, sales of 3.3M dmt, revenues of $357M and EBITDA of $33M1
-
Initial production of DR quality iron ore from the DRPF project with initial shipment expected in Q2 FY27
-
Completion of the acquisition of Rana Gruber, a proven high-purity iron ore producer in Norway
MONTRÉAL, July 29, 2026 /CNW/ -- SYDNEY, July 30, 2026 - Champion Iron Limited (ASX: CIA) (TSX: CIA) (OTCQX: CIAFF) ("Champion" or the "Company") reports its operational and financial results for its financial first quarter ended June 30, 2026.
Champion's CEO, Mr. David Cataford, said, "In an environment marked by economic uncertainty and market volatility, our dedicated team remains focused on executing our strategic priorities and optimizing operations to enhance our competitive positioning and financial resilience. The completion of the DRPF project once again demonstrates our ability to successfully deliver large-scale projects, enabling us to engage with new customers, further participate in decarbonizing the steel industry and improve our realized prices. As we complete the integration of Rana Gruber, our focus shifts towards unlocking opportunities across our businesses, including cost management initiatives, while continuing to implement our long-term vision and strengthen Champion's position as a leading global supplier of high-purity iron ore."
Conference Call Details
Champion will host a conference call and webcast on July 30, 2026, at 9:00 AM (Montréal time) / 11:00 PM (Sydney time) to discuss the results of its financial first quarter ended June 30, 2026. The conference call details are set out at the end of this press release.
Note to Readers
Following the acquisition of Rana Gruber AS ("Rana Gruber") on April 10, 2026, to maximize transparency for stakeholders regarding the performance of Bloom Lake and Rana Gruber, operational metrics and selected financial metrics are presented separately for Bloom Lake and Rana Gruber in Section 2 of this press release. It is also important to note that, following the acquisition, Champion aligned Rana Gruber's financial information with its reporting practices. Accordingly, caution should be exercised when comparing current-period results with Rana Gruber's historical results reported prior to the completion of the acquisition, as well as with Champion's previous results. Additional details about the Rana Gruber acquisition are provided in the unaudited condensed consolidated financial statements for the three-month period ended June 30, 2026 (the "Financial Statements") and associated management's discussion and analysis (the "MD&A") of the Company, available on the ASX at www.asx.com.au , SEDAR+ at www.sedarplus.ca and on the Company's website at www.championiron.com .
1. Quarterly Highlights
Operations and Sustainability
- No serious workplace injuries and no major environmental incidents were reported during the three-month period ended June 30, 2026;
- Quarterly production of 3.9 million wmt of high-purity iron ore concentrates for the three-month period ended June 30, 2026, a 12% increase over the same prior-year period, primarily attributable to the acquisition of Rana Gruber (0.4 million wmt), while Bloom Lake continued to deliver operational performance (3.5 million wmt); and
- Quarterly sales totalled 3.3 million dmt of high-purity iron ore concentrates (3.1 million dmt and 0.2 million dmt from Bloom Lake and Rana Gruber, respectively) for the three-month period ended June 30, 2026, a decrease of 13% from the same prior-year period, primarily reflecting the planned transition and shipment sequencing associated with the DRPF ramp-up at Bloom Lake, partially offset by sales from Rana Gruber's operations.
Financial Results
- Financial results for the quarter were impacted by the timing of iron ore shipments associated with DRPF commissioning activities, which deferred a portion of revenues and related net income, EBITDA and cash flows from operating activities to future periods, as well as by higher freight and fuel and lower fixed cost absorption;
- Gross average realized selling price of US$115.2/dmt1, compared to the P65 index average price of US$121.9/dmt in the period;
- Net average realized selling price of US$77.5/dmt1, a decrease of 11% quarter-over-quarter and an increase of 6% year-over-year;
- C1 cash cost for the iron ore concentrates loaded onto vessels totalled $83.7/dmt1 (US$60.5/dmt)2, up from $81.9/dmt1 (US$59.2/dmt)2 for the same period in 2025. C1 cash cost for the period was negatively impacted by the absorption of fixed costs over lower iron ore sales volumes, together with a significant rise in fuel prices attributable to the conflict in the Middle East;
- Net loss of $41.5 million, representing a loss per share of $0.07, compared to net income of $23.2 million with EPS of $0.04 in the previous quarter, and net income of $23.8 million with EPS of $0.05 in the same prior-year period. The net loss was primarily driven by an unrealized foreign exchange loss of $17.2 million on net monetary liabilities denominated in foreign currencies, as well as unfavourable fair value adjustments of $17.6 million on derivative instruments;
- EBITDA of $32.8 million1, compared to $114.3 million1 in the previous quarter and $57.8 million1 in the same prior-year period, negatively impacted by several factors, including the timing of sales, unfavourable changes in fair value of derivative instruments of $17.6 million which also impacted net loss, DRPF start-up costs of $6.6 million and inventory valuation adjustments in relation to the acquisition of Rana Gruber of $2.9 million;
- Cash balance, excluding the unused portion of the initial cash contributions from Nippon Steel Corporation ("Nippon Steel") and Sojitz Corporation ("Sojitz", and collectively with Nippon Steel, the "Partners") held in a restricted cash account by Kami Iron Mine Partnership (the "Kami Partnership"), totalled $198.6 million as at June 30, 2026, a decrease of $98.2 million since March 31, 2026, primarily reflecting lower net cash flows from operating activities and the use of cash on hand to finance the acquisition of Rana Gruber; and
- Available liquidity remained robust at $653.1 million1 as at June 30, 2026, compared with $812.4 million1 as at March 31, 2026.
DRPF Project Update
- Completed the DRPF project within its recently estimated $500 million budget with cumulative investments totalling $493.7 million as at June 30, 2026;
- Secured a commercial agreement for a portion of near-term production capacity, while advancing discussions with additional prospective customers; and
- Successfully produced the first DR quality iron ore, with an inaugural commercial shipment expected in the third calendar quarter of 2026.
Development and Other Growth Initiatives
- Completed the acquisition of Rana Gruber on April 10, 2026; and
- Entered into a new term loan under the Company's syndicated senior credit facilities to finance the acquisition of Rana Gruber and extended the maturity of the existing US$400 million senior revolving credit facility to April 2030.
2. Financial and Operating Performance
| Q1 FY27 | Q4 FY26 | Q/Q Change | Q1 FY26 | Y/Y Change | |||
| Consolidated Operation Data | |||||||
| Iron ore concentrates produced (wmt) | 3,939,400 | 3,435,100 | 15 % | 3,520,600 | 12 % | ||
| Iron ore concentrates sold (dmt) | 3,339,000 | 3,455,400 | (3) % | 3,831,800 | (13) % | ||
| Consolidated Financial Data (in thousands of dollars) | |||||||
| Revenues | 356,876 | 414,505 | (14) % | 390,027 | (8) % | ||
| Cost of sales | 288,751 | 285,785 | 1 % | 313,928 | (8) % | ||
| Net income (loss) | (41,528) | 23,186 | (279) % | 23,784 | (275) % | ||
| Adjusted net income (loss)1 | (35,229) | 23,186 | (252) % | 23,784 | (248) % | ||
| EBITDA1 | 32,790 | 114,340 | (71) % | 57,753 | (43) % | ||
| Consolidated Statistics (in dollars per dmt sold) | |||||||
| Gross average realized selling price1 | 158.7 | 165.1 | (4) % | 146.0 | 9 % | ||
| Net average realized selling price1 | 106.9 | 120.0 | (11) % | 101.8 | 5 % | ||
| C1 cash cost1 | 83.7 | 82.7 | 1 % | 81.9 | 2 % | ||
| AISC1 | 111.3 | 96.9 | 15 % | 96.2 | 16 % | ||
| Cash operating margin1 | (4.4) | 23.1 | (119) % | 5.6 | (179) % |
A. Consolidated Revenues
Revenues totalled $356.9 million for the three-month period ended June 30, 2026, a decrease of $33.2 million from $390.0 million in the same prior-year period, despite the inclusion of $23.9 million of revenues from Rana Gruber following the acquisition completed on April 10, 2026. Excluding the acquisition of Rana Gruber, lower revenues were mainly attributable to Bloom Lake's lower sales volumes during the three-month period ended June 30, 2026, compared to the same period in 2025. Bloom Lake's sales volumes were affected by the timing of vessel shipments, as vessel bookings reflected lower anticipated volumes transported to the Port of Sept-Îles during the DRPF project ramp-up period. The increase in the gross average realized selling price offset the rise in freight costs during the period when compared with the previous period.
For the three-month period ended June 30, 2026, the gross average realized selling price of US$115.2/dmt1 was below the P65 index average price of US$121.9/dmt. The 2.1 million dmt of iron ore sold that remained subject to pricing adjustments as at June 30, 2026, were evaluated using an average forward selling price of US$110.4/dmt, which is lower than the P65 index average price for the period. In addition, index prices on Bloom Lake's concentrate sales based on backward-looking pricing were also below the P65 index average price of the period. During the quarter, the Company continued to prepare for Bloom Lake's transition to higher-purity DR quality iron ore and intentionally allocated a lower proportion of sales volumes to long-term contracts. This approach allowed the Company to retain a greater proportion of its available iron ore products for the short-term and spot markets, which have recently experienced greater pricing volatility and discounts relative to the iron ore indexes.
During the three-month period ended June 30, 2026, an average final price of US$118.3/dmt was established for the 2.3 million dmt of iron ore concentrates sold that were subject to provisional pricing adjustments as at March 31, 2026, which were previously evaluated using an average estimated price of US$120.2/dmt. Accordingly, negative provisional pricing adjustments of $6.2 million were recorded for tonnes subject to provisional pricing as at March 31, 2026, representing a negative impact of US$1.3/dmt for the 3.3 million dmt sold during the quarter.
Freight and other costs totalled US$36.4/dmt during the three-month period ended June 30, 2026, representing a 35% increase compared to US$26.9/dmt in the same prior-year period, mainly reflecting a 63% increase in the average C3 index. While the C3 index increased significantly during the quarter, the Company's freight and other costs increased at a slower pace, reflecting the Company's agile vessel booking strategies, favourable freight rates secured under fixed-price contracts below prevailing market levels for a portion of the sales volumes, and the positive impact of backward-looking pricing mechanisms. The rise in the C3 index, driven by the ongoing conflict in the Middle East, is expected to continue impacting Champion's net revenues in the quarter ending September 30, 2026, as most vessels are booked three to five weeks prior to the desired laycan period.
After taking into account sea freight and other costs of US$36.4/dmt and the negative provisional pricing adjustments of US$1.3/dmt, the Company obtained a net average realized selling price of US$77.5/dmt2 (C$106.9/dmt1) for its high-purity iron ore concentrates shipped during the three-month period ended June 30, 2026.
B. Bloom Lake Mine Results
Bloom Lake conducts scheduled maintenance on both plants in the second and fourth financial quarters, which may create significant quarter-over-quarter variances in production output and mining and processing costs.
| Q1 FY27 | Q4 FY26 | Q/Q Change | Q1 FY26 | Y/Y Change | |||
| Mine Operating Data | |||||||
| Iron ore concentrates produced (wmt) | 3,547,200 | 3,435,100 | 3 % | 3,520,600 | 1 % | ||
| Iron ore concentrates sold (dmt) | 3,128,800 | 3,455,400 | (9) % | 3,831,800 | (18) % | ||
| Stripping ratio | 1.04 | 1.11 | (6) % | 1.09 | (5) % | ||
| Head grade Fe (%) | 29.5 | 28.8 | 2 % | 28.2 | 5 % | ||
| Fe recovery (%) | 79.0 | 80.6 | (2) % | 78.2 | 1 % | ||
| Weighted average products Fe (%) | 66.5 | 66.2 | -- % | 66.3 | -- % | ||
| Mine Selected Financial Data (in thousands of dollars) | |||||||
| Revenues | 332,980 | 414,505 | (20) % | 390,027 | (15) % | ||
| Cost of sales | 267,504 | 285,785 | (6) % | 313,928 | (15) % | ||
| Gross profit | 27,408 | 85,191 | (68) % | 29,894 | (8) % | ||
| Mine Selected Statistics (in dollars per dmt sold) | |||||||
| Net average realized selling price1 | 106.4 | 120.0 | (11) % | 101.8 | 5 % | ||
| C1 cash cost1 | 83.4 | 82.7 | 1 % | 81.9 | 2 % | ||
| AISC1 | 104.4 | 96.9 | 8 % | 93.0 | 12 % |
i. Operating Performance
Bloom Lake produced 3.5 million wmt of high-purity iron ore concentrates during the three-month period ended June 30, 2026, comparable to the same period in 2025, benefiting from higher ore grade and Fe recovery. The quarterly production level was impacted by the DRPF facilities progressing through commissioning. The production included 0.6 million wmt of concentrate produced through the DRPF infrastructure, with product quality progressively improving toward targeted purity specifications in accordance with the commissioning process. As a result, the weighted average product grade increased to 66.5% Fe. During the three-month period ended June 30, 2026, the Fe recovery rate increased to 79.0% from 78.2% for the same period in 2025, benefiting from improved performance of the gravimetric systems, following work programs and operational optimizations.
Sales volumes of iron ore concentrates during the three-month period ended June 30, 2026, were 18% lower than in the same prior-year period, as the prior-year period benefited from strong sales volumes due to stockpiled inventory. Current period sales were impacted by scheduled third-party port and rail maintenance shutdowns, as well as the timing of sales primarily related to the DRPF project's commissioning. Inventories of iron ore concentrates at Bloom Lake and at the port totalled 1.7 million wmt as at June 30, 2026, compared to 1.3 million wmt as at March 31, 2026. Inventory levels increased during the quarter as production exceeded sales volumes, reflecting the timing of shipments and the commissioning activities associated with the DRPF project. These inventories are expected to provide operational flexibility and support future sales activities. As the Company advances the commissioning of the DRPF project, it continues to optimize its inventory management strategies to maintain adequate saleable inventories, manage different iron ore qualities and enhance production and sales logistics.
During the three-month period ended June 30, 2026, the Company mined and hauled 19.8 million wmt of waste and ore, compared to 21.0 million wmt in the same prior-year period. The stripping ratio for the three-month period ended June 30, 2026, was 1.04, compared to a 1.09 ratio recorded in the same prior-year period. Champion anticipates maintaining this stripping cadence in upcoming periods, consistent with its LoM plan.
ii. Financial Performance
The cost of sales associated with Bloom Lake operations totalled $267.5 million, compared to $313.9 million for the same period in 2025. For the three-month period ended June 30, 2026, mining and processing costs totalled $54.5/dmt produced1, representing a 1% increase, compared to $53.7/dmt produced1 in the same prior-year period, primarily attributable to higher fuel prices due to the conflict in the Middle East, and higher explosives prices, partially offset by cost optimization efforts. Land transportation and port handling costs include both fixed and variable components and are significantly influenced by the volume hauled from Fermont to the Port of Sept-Îles. Land transportation and port handling costs for the three-month period ended June 30, 2026, were $30.6/dmt sold1, a 26% increase, compared to the prior-year period, mainly reflecting lower sales volumes. In addition, cost of sales was impacted by changes in iron ore concentrates inventory valuation, which incorporate mining and processing costs from the previous quarter, along with variations in production and sales volumes. Consequently, Bloom Lake C1 cash cost totalled $83.4/dmt1, compared to $81.9/dmt1 for the same period in 2025. C1 cash cost excludes DRPF start-up costs, which mainly include abnormal operational costs incurred as the facility progresses toward commercial production.
Despite lower shipment volumes, gross profit remained relatively stable at $27.4 million during the three-month period ended June 30, 2026, compared to $29.9 million for the same period in 2025. This is primarily reflecting higher realized selling prices and the impact of inventory valuation movements, which partially offset the effect of lower sales volumes.
AISC totalled $104.4/dmt1 for the three-month period ended June 30, 2026, compared to $93.0/dmt1 for the same prior-year period. The increase in AISC mostly reflected lower shipment volumes and higher sustaining capital expenditures, primarily attributable to the expansion of tailings storage capacity in line with the Company's long-term investment plan at Bloom Lake, overhaul expenditures on mining equipment, and ongoing mine development initiatives, including topographic and pre-cut drilling work. The timing of planned sustaining activities for the current financial year also resulted in a higher proportion of expenditures being incurred during the first quarter.
C. Rana Gruber Mine Results
Comparisons of unit costs between Champion's operating segments should be interpreted with consideration given to the differences in production methods, processing operations and logistics infrastructure specific to each operation. Considering its significantly shorter rail haulage distance, compared to Bloom Lake, the cost structure at Rana Gruber has a lower share attributable to land transportation and port handling, with a higher proportion of costs incurred at the mining and processing stages.
The following Rana Gruber results have been consolidated since the acquisition date of April 10, 2026, and accordingly represent less than a full quarter of operations.
| Q1 FY27 | ||
| Mine Operating Data | ||
| Iron ore concentrates produced (wmt) | 392,200 | |
| Iron ore concentrates sold (dmt) | 210,200 | |
| Open-pit stripping ratio | 2.00 | |
| Head grade Fe (%) | 31.7 | |
| Fe recovery (%) | 75.3 | |
| Weighted average products Fe (%) | 65.2 | |
| Mine Selected Financial Data (in thousands of dollars) | ||
| Revenues | 23,896 | |
| Cost of sales | 21,247 | |
| Gross loss | (5,989) | |
| Mine Selected Statistics (in dollars per dmt sold) | ||
| Net average realized selling price1 | 113.7 | |
| C1 cash cost1 | 87.5 | |
| AISC1 | 147.0 |
i. Operating Performance
Rana Gruber produced 0.4 million wmt of high-purity iron ore concentrates at a weighted average grade of 65.2% Fe since the acquisition date of April 10, 2026. When adjusted to reflect a full quarter of operations, production was in line with Rana Gruber's nameplate capacity after taking into account the annual maintenance shutdown usually conducted in June. Production benefited from stable mill throughput of 1.0 million wmt at a weighted average head grade of 31.7% Fe and Fe recovery of 75.3%.
Iron ore concentrates sold totalled 0.2 million dmt since the acquisition date and remained significantly below production levels, including on a full-quarter equivalent basis, primarily reflecting the timing of shipments. As a result, inventories of iron ore concentrates increased to 0.4 million wmt during the quarter and remained at elevated levels as at June 30, 2026. Management continues to focus on reducing inventory levels over time by optimizing sales opportunities.
ii. Financial Performance
Cost of sales totalled $21.2 million for the quarter, including mining and processing costs of $31.2 million, land transportation and port handling costs of $0.6 million and a purchase price allocation inventory adjustment of $2.9 million, partially offset by a $13.5 million change in iron ore concentrates inventories. Handling costs are largely captured within mining and processing costs, while limited land transportation costs are incurred prior to shipment, resulting in land transportation and port handling costs of $2.8/dmt sold1. Mining and processing costs totalled $85.7/dmt produced¹, while C1 total cash cost amounted to $87.5/dmt sold1, higher than historical levels. Higher C1 total cash cost was primarily attributable to several factors, including increased underground mining costs resulting from higher explosives prices and temporary operational challenges related to ventilation and water management. In addition, open-pit mining costs were impacted by increased hauling and waste rock activities in a new open-pit commissioned in January 2026, as well as higher diesel prices. C1 cash cost excludes inventory adjustments made as part of the purchase price allocation, as it reflects the fair value step-up of inventories recognized as part of the acquisition of Rana Gruber and is not representative of the underlying operating cost of producing and selling iron ore concentrates.
Gross loss totalled $6.0 million during the three-month period ended June 30, 2026, primarily attributable to low shipment volumes, the product mix of hematite and magnetite sold during the period, higher cost of sales and the purchase price allocation inventory adjustment of $2.9 million.
AISC totalled $147.0/dmt1 for the three-month period ended June 30, 2026, reflecting higher sustaining capital expenditures attributable to the development of an additional underground mining level, including related infrastructure, and other mine development activities, together with the negative impact of lower sales volumes.
D. Net Income (Loss) & EBITDA
For the three-month period ended June 30, 2026, the Company generated a net loss of $41.5 million (loss per share of $0.07), compared to net income of $23.8 million (EPS of $0.05) for the same prior-year period. The net loss was mainly attributable to an unrealized foreign exchange loss of $17.2 million on net monetary liabilities denominated in foreign currencies, as well as unfavourable fair value adjustments of $17.6 million on derivative instruments.
For the three-month period ended June 30, 2026, the Company generated EBITDA of $32.8 million1, representing an EBITDA margin of 9%1, compared to $57.8 million1, representing an EBITDA margin of 15%1, for the same period in 2025. Lower EBITDA and EBITDA margins were mainly driven by the previously mentioned unfavourable fair value adjustments on derivative instruments, DRPF start-up costs of $6.6 million and inventory valuation adjustments in relation to the acquisition of Rana Gruber of $2.9 million.
E. All-in Sustaining Cost & Cash Operating Margin
During the three-month period ended June 30, 2026, the Company realized an AISC of $111.3/dmt1, compared to $96.2/dmt1 for the same period in 2025. This increase was mainly due to higher sustaining capital expenditures and higher cash cost, combined with lower volumes of iron ore concentrates sold.
The Company generated a negative cash operating margin of $4.4/dmt1 for each tonne of high-purity iron ore concentrates sold during the three-month period ended June 30, 2026, compared to a positive cash operating margin of $5.6/dmt1 for the same prior-year period. This decrease was mainly due to a higher AISC, partially offset by a higher net average realized selling price.
3. Exploration Activities
During the three-month period ended June 30, 2026, the Company maintained all its properties in good standing and did not enter into any farm-in or farm-out arrangements. During the three-month period ended June 30, 2026, $1.9 million in exploration and evaluation expenditures were incurred, compared to $8.8 million for the same prior-year period. The lower expenditures year-over-year reflected the transfer of the Kami properties to the Kami Partnership and the Partners' acquisition of the aggregate 49% interest in the Kami Partnership in September 2025.
Exploration and evaluation expenditures related to Canadian activities carried out in Québec and Newfoundland and Labrador. Details on exploration projects, including maps, are available on the Company's website at www.championiron.com under the Operations & Projects section. The information on the Company's website is not incorporated by reference into this press release.
4. Cash Flows -- Purchase of Property, Plant and Equipment
| Three Months Ended | ||||
| June 30, | ||||
| (in thousands of dollars) | 2026 | 2025 | ||
| Tailings and water infrastructure | 20,821 | 14,766 | ||
| Stripping and mining activities | 21,636 | 12,975 | ||
| Tunnelling and underground infrastructure | 3,782 | -- | ||
| Other sustaining capital expenditures | 31,965 | 14,500 | ||
| Sustaining Capital Expenditures | 78,204 | 42,241 | ||
| DRPF project | 14,218 | 47,460 | ||
| Other capital development expenditures | 8,499 | 15,674 | ||
| Purchase of Property, Plant and Equipment as per Cash Flows | 100,921 | 105,375 |
Sustaining Capital Expenditures
The tailings-related investments for the three-month period ended June 30, 2026, were in line with QIO's long-term plan to support the LoM operations. As part of its ongoing tailings infrastructure monitoring and inspections, Champion remains committed to its safe tailings strategy and continues to implement its long-term investment plan at Bloom Lake. Tailings-related construction activities are typically conducted between May and November, when weather conditions are more favourable at Bloom Lake.
Stripping and mining activities for the three-month period ended June 30, 2026, included $17.8 million of mine development costs, comprising topographic and pre-cut drilling work, the details of which are contained in the Company's mine plan ($7.8 million for the same period in 2025). During the three-month period ended June 30, 2026, stripping and mining activities also included $3.8 million of capitalized stripping costs ($5.2 million for the same period in 2025).
Tunnelling and underground infrastructure expenditures are related to Rana Gruber and included ramp access and other underground infrastructure works.
Other sustaining capital investments for the three-month period ended June 30, 2026, included expenditures related to mining equipment rebuild programs that are aligned with the Company's long-term investment strategy to support growth initiatives across the LoM.
DRPF Project
During the three-month period ended June 30, 2026, the Company spent $14.2 million in capital expenditures related to the DRPF project ($47.5 million, for the same prior-year period). The decrease primarily reflects the substantial completion of construction activities, with investments during the period mainly consisting of commissioning ramp-up activities. Cumulative investments totalled $493.7 million as at June 30, 2026.
Other Capital Development Expenditures
During the three-month period ended June 30, 2026, other capital development expenditures totalled $8.5 million ($15.7 million for the same period in 2025), and are detailed as follows:
| Three Months Ended | |||
| June 30, | |||
| (in thousands of dollars) | 2026 | 2025 | |
| Infrastructure improvements and conformity (i) | 6,017 | 3,019 | |
| Mine maintenance garage expansion | -- | 457 | |
| Deposits or final payment for mining equipment | 21 | 6,219 | |
| Other (ii) | 2,461 | 5,979 | |
| Other Capital Development Expenditures | 8,499 | 15,674 |
| (i) | Infrastructure improvements and conformity expenditures included various capital projects aimed at improving the performance or capacity of assets and complying with various regulations governing mining practices. |
| (ii) | Other expenditures included cash borrowing costs capitalized on the DRPF project and the construction of new ventilation shafts related to underground infrastructure at Rana Gruber. |
5. Conference Call and Webcast Information
A webcast and conference call to discuss the foregoing results will be held on July 30, 2026, at 9:00 AM (Montréal time) / 11:00 PM (Sydney time). Listeners may access a live webcast of the conference call from the Investors section of the Company's website at www.championiron.com/investors/events-presentations or by dialing toll free +1-888-699-1199 within North America or +61-2-8017-1385 from Australia.
An online archive of the webcast will be available by accessing the Company's website at www.championiron.com/investors/events-presentations . A telephone replay will be available for one week after the call by dialing +1-888-660-6345 within North America or +1-289-819-1450 overseas, and entering passcode 84810#.
About Champion Iron Limited
Champion is a high-purity iron ore producer with operations in Canada and Norway. Through Quebec Iron Ore Inc., Champion owns and operates the Bloom Lake Mining Complex located on the south end of the Labrador Trough, approximately 13 kilometres north of Fermont, Québec. Bloom Lake is an open-pit operation with two concentration plants that primarily source energy from renewable hydroelectric power, having a combined nameplate capacity of 15M wmt per year that produce low contaminant high-purity iron ore concentrates with a proven ability to produce direct reduction grade quality iron ore concentrate. The iron ore concentrate from Bloom Lake is transported by rail, to a ship loading port in Sept-Îles, Québec. Benefiting from one of the highest purity resources globally, Champion is implementing a work program to be able to upgrade up to half of the Bloom Lake's mine capacity to a direct reduction quality pellet feed iron ore with up to 69% Fe. Bloom Lake's high-purity and lower contaminant iron ore products have attracted a premium to the P61 index (formerly, the P62 index). Champion also owns and operates Rana Gruber, a Norwegian iron ore producer based in Mo i Rana, Nordland. With continuous production dating back to the 1960s, Rana Gruber produces approximately 1.8M dmt per year of hematite and magnetite iron ore concentrates. Champion has delivered iron ore concentrates to global markets, including China, Japan, the Middle East, Europe, South Korea, India, Southeast Asia, North Africa and Canada. In addition to its producing mines, Champion holds a 51% interest in Kami Iron Mine Partnership, which is jointly owned with Nippon Steel Corporation and Sojitz Corporation, and through which the Kami Project is held. Located approximately 21 kilometres southeast of Bloom Lake, the Kami Project benefits from access to existing infrastructure. Champion also holds a portfolio of exploration and development projects in the Labrador Trough, including the Cluster II properties, which are situated within 60 kilometres south of Bloom Lake.
Cautionary Note Regarding Forward-Looking Statements
This press release contains certain information and statements that may constitute "forward-looking information" under applicable securities legislation ("Forward-Looking Statements"). Forward-Looking Statements are statements that are not historical facts and are generally, but not always, identified by the use of words such as "will", "plans", "expects", "is expected", "budget", "scheduled", "estimates", "continues", "forecasts", "projects", "predicts", "intends", "anticipates", "aims", "targets" or "believes", or variations of, or the negatives of, such words and phrases or state that certain actions, events or results "may", "could", "would", "should", "might" or "will" be taken, occur or be achieved. Inherent in Forward-Looking Statements are risks, uncertainties and other factors beyond the Company's ability to predict or control.
Specific Forward-Looking Statements
All statements, other than statements of historical facts, included in this press release that address future events, developments or performance that Champion expects, anticipates or believe may or will occur are Forward-Looking Statements. Forward-Looking Statements may include, among other things, Management's expectations regarding: (i) Bloom Lake's LoM, long-term investment plan and efforts to improve recovery rates and production, nameplate capacity and related opportunities and benefits; (ii) the project to upgrade the Bloom Lake iron ore concentrate to a higher purity and to convert approximately half of Bloom Lake's increased mine capacity to a DR quality pellet feed iron ore (the DRPF project), expected DRPF project timeline, efficiencies, economic and other benefits, related engagement with, and expectations with respect to, prospective customers, the expected commercial shipments of iron ore and the impact thereof on production, sales and financial results and the timing thereof; (iii) the Kami Partnership and the ability of Champion to realize on the benefits of the Kami transaction with the Partners; (iv) the acquisition of Rana Gruber, including the expectations regarding the integration of Rana Gruber, and the ability of Champion to realize the anticipated benefits of the acquisition of Rana Gruber; (v) the shift in steel industry production methods, expected rising demand for higher-purity iron ore products and DRI globally and related market deficit and higher premiums, and the Company's participation therein, contribution thereto and positioning in connection therewith, including the transition of the Company's product offering (including producing high-purity DRPF products) and the expansion of its geography, markets and customer base, related investments and expected benefits thereof; (vi) maintaining stripping activities cadence; (vii) ore inventory management strategies, including product blending, short-term stockpiling and reducing inventory levels at Rana Gruber; (viii) the Company's safe tailings strategy and tailings investment plan, mining equipment rebuild programs; (ix) the impact of exchange rates on commodity prices and the Company's financial results; (x) the relationship between iron ore prices and ocean freight costs (including C3 index outlook) and their impact on the Company; (xi) the impact of iron ore price fluctuations on the Company and its financial results and the occurrence of certain events and their impact on iron ore prices and demand for high-purity iron ore products; (xii) pricing of the Company's products (including provisional pricing); (xiii) the Company's iron ore concentrates pricing trends compared to the P65 index; (xiv) available liquidity and the Company's financial flexibility; (xv) the Company's beliefs regarding non-IFRS and other financial measures, including usefulness of those measures for investors to understand the Company's results and ability to generate operating earnings, compare operating results between periods, evaluate business performance, assess liquidity and cash flows to fund working capital needs and capital expenditures, and service debt obligations; (xvi) the Company's beliefs regarding compliance with applicable laws and regulations, including that it has all necessary licenses, permits and approvals required to carry out its activities; and (xvii) the Company's strategic and growth initiatives and opportunities generally and their potential to optimize shareholder returns, unlock value for stakeholders and reinforce the Company's leadership in the high-purity iron ore industry.
Risks
Although the Company believes the expectations expressed in such Forward-Looking Statements are based on reasonable assumptions, such Forward-Looking Statements involve known and unknown risks, uncertainties and other factors, most of which are beyond the control of the Company, which may cause the Company's actual results, performance or achievements to differ materially from those expressed or implied by such Forward-Looking Statements. Factors that could cause actual results to differ materially from those expressed in Forward-Looking Statements include, without limitation: (i) iron ore prices; (ii) energy prices; (iii) operating costs; (iv) freight costs; (v) general economic, competitive, political and social uncertainties; (vi) continued availability of capital and financing and general economic, market or business conditions; (vii) timing of and uncertainty regarding the steel industry shift in production methods, impacting demand for high-purity feed; (viii) failure of plant, equipment or processes, including those of third party providers or counterparties, to operate as anticipated; (ix) delays in obtaining governmental approvals, necessary permitting or in the completion of development or construction activities; (x) the results of feasibility studies; (xi) changes in the assumptions used to prepare feasibility studies; (xii) project delays; (xiii) geopolitical events; and (xiv) the effects of catastrophes and public health crises on the global economy, the iron ore market and Champion's operations, as well as those factors discussed in the section entitled "Risk Factors" of the Company's Management's Discussion and Analysis for the financial year ended March 31, 2026, available under the Company's profile on the ASX at www.asx.com.au , SEDAR+ at www.sedarplus.ca and the Company's website at www.championiron.com .
There can be no assurance that any such Forward-Looking Statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such Forward-Looking Statements. Accordingly, readers should not place undue reliance on Forward-Looking Statements.
Additional Updates
All of the Forward-Looking Statements contained in this press release are given as of the date hereof or such other date or dates specified in the Forward-Looking Statements and are based upon the judgment and estimates of Champion's Management and information available to Management as at the date hereof. Champion disclaims any intention or obligation to update or revise any of the Forward-Looking Statements, whether as a result of new information, future events or otherwise, except as required by law. If the Company does update one or more Forward-Looking Statements, no inference should be drawn that it will make additional updates with respect to those or other Forward-Looking Statements. Champion cautions that the foregoing list of risks and uncertainties is not exhaustive. Readers should carefully consider the above factors as well as the uncertainties they represent and the risks they entail.
Abbreviations
Unless otherwise specified, all dollar figures stated herein are expressed in Canadian dollars. The following abbreviations are used throughout this release: US$ (United States dollar), Fe (iron), wmt (wet metric tonnes), dmt (dry metric tonnes), M (million), km (kilometers), LoM (life of mine), Bloom Lake or Bloom Lake Mine (Bloom Lake Mining Complex), Rana Gruber Mine (Mo i Rana Mining Complex), DR (Direct Reduction), DRPF (Direct Reduction Pellet Feed), Kami Project (Kamistiatusset project), C3 index (C3 Baltic Capesize index), P61 index (Platts IODEX 61% Fe CFR China index), P62 index (Platts IODEX 62% Fe CFR China index), P65 index (Platts IODEX 65% Fe CFR China index), EBITDA (earnings before income and mining taxes, net finance costs and depreciation) and EPS (earnings per share). The utilization of "Champion" or the "Company" refers to Champion Iron Limited and/or one, or more, or all of its subsidiaries, as applicable. The term "IFRS" refers to International Financial Reporting Standards as issued by the International Accounting Standards Board.
For additional information on Champion Iron Limited, please visit our website at: www.championiron.com .
This document has been authorized for release to the market by the Board of Directors.
The Financial Statements and associated MD&A for the three-month period ended June 30, 2026, are available under the Company's profile on the ASX (www.asx.com.au ), SEDAR+ (www.sedarplus.ca ) and the Company's website (www.championiron.com ) on July 30, 2026.
| _____________________________________ | |
| 1 | This is a non-IFRS financial measure, ratio or other financial measure. The measure is not a standardized financial measure under the financial reporting framework used to prepare the Financial Statements and might not be comparable to similar financial measures used by other issuers. Refer to the section below -- Non-IFRS and Other Financial Measures for definitions of these metrics and reconciliations to the most comparable IFRS measure when applicable. Additional details for these non-IFRS and other financial measures, have been incorporated by reference and can be found in section 20 of the Company's MD&A for the three-month period ended June 30, 2026, available on the ASX at www.asx.com.au, SEDAR+ at www.sedarplus.ca and on the Company's website under the Investors section at www.championiron.com. |
| 2 | See the "Currency" subsection included in section 6 -- Key Drivers of the MD&A for the three-month period ended June 30, 2026, available on the ASX at www.asx.com.au, SEDAR+ at www.sedarplus.ca and on the Company's website under the Investors section at www.championiron.com. |
Non-IFRS and Other Financial Measures
The Company has included certain non-IFRS financial measures, ratios and supplementary financial measures in this press release to provide investors with additional information in order to help them evaluate the underlying performance of the Company. These measures are mainly derived from the Financial Statements but do not have any standardized meaning prescribed by IFRS and, therefore, may not be comparable to similar measures presented by other companies. Management believes that these measures, in addition to conventional measures prepared in accordance with IFRS, provide investors with an improved ability to understand the results of the Company's operations. Non-IFRS and other financial measures should not be considered in isolation or as substitutes for measures of performance prepared in accordance with IFRS. The exclusion of certain items from non-IFRS financial measures does not imply that these items are necessarily non-recurring. Mine performance measures should be read in conjunction with segmented information disclosed in note 25 to the Financial Statements.
The Company presents certain of its non-IFRS measures and other financial measures in United States dollars in addition to Canadian dollars to facilitate comparability with measures presented by other companies.
EBITDA and EBITDA Margin
| (in thousands of dollars) | Q1 FY27 | Q4 FY26 | Q1 FY26 | |
| Income (loss) before income and mining taxes | (50,312) | 51,078 | 24,213 | |
| Net finance costs (income) | 35,861 | 19,733 | (13,256) | |
| Depreciation | 47,241 | 43,529 | 46,796 | |
| EBITDA | 32,790 | 114,340 | 57,753 | |
| Revenues | 356,876 | 414,505 | 390,027 | |
| EBITDA margin | 9 % | 28 % | 15 % |
Available Liquidity
| As at June 30, | As at March 31, | |||
| (in thousands of dollars) | 2026 | 2026 | ||
| Cash | 198,621 | 296,788 | ||
| Undrawn amounts under credit facilities | 454,516 | 515,600 | ||
| Available liquidity | 653,137 | 812,388 |
C1 Cash Cost
| Q1 FY27 | Q4 FY26 | Q1 FY26 | ||
| Iron ore concentrates sold (dmt) | 3,339,000 | 3,455,400 | 3,831,800 | |
| (in thousands of dollars, except per dmt data) | ||||
| Cost of sales | 288,751 | 285,785 | 313,928 | |
| Less: Purchase price allocation inventory adjustment | (2,865) | -- | -- | |
| Less: Start-up costs | (6,551) | -- | -- | |
| 279,335 | 285,785 | 313,928 | ||
| C1 cash cost (per dmt sold) | 83.7 | 82.7 | 81.9 |
All-in Sustaining Cost
| Q1 FY27 | Q4 FY26 | Q1 FY26 | ||
| Iron ore concentrates sold (dmt) | 3,339,000 | 3,455,400 | 3,831,800 | |
| (in thousands of dollars, except per dmt data) | ||||
| Cost of sales | 288,751 | 285,785 | 313,928 | |
| Less: Purchase price allocation inventory adjustment | (2,865) | -- | -- | |
| Less: Start-up costs | (6,551) | -- | -- | |
| Sustaining capital expenditures | 78,204 | 31,162 | 42,241 | |
| General and administrative expenses | 14,185 | 17,836 | 12,581 | |
| 371,724 | 334,783 | 368,750 | ||
| AISC (per dmt sold) | 111.3 | 96.9 | 96.2 |
Cash Operating Margin and Cash Profit Margin
| Q1 FY27 | Q4 FY26 | Q1 FY26 | ||
| Iron ore concentrates sold (dmt) | 3,339,000 | 3,455,400 | 3,831,800 | |
| (in thousands of dollars, except per dmt data) | ||||
| Revenues | 356,876 | 414,505 | 390,027 | |
| Net average realized selling price (per dmt sold) | 106.9 | 120.0 | 101.8 | |
| AISC (per dmt sold) | 111.3 | 96.9 | 96.2 | |
| Cash operating margin (per dmt sold) | (4.4) | 23.1 | 5.6 | |
| Cash profit margin | (4) % | 19 % | 6 % |
Gross Average Realized Selling Price per dmt Sold
| Q1 FY27 | Q4 FY26 | Q1 FY26 | |
| Iron ore concentrates sold (dmt) | 3,339,000 | 3,455,400 | 3,831,800 |
| (in thousands of dollars, except per dmt data) | |||
| Revenues | 356,876 | 414,505 | 390,027 |
| Provisional pricing adjustments | 6,205 | 299 | 26,552 |
| Freight and other costs | 166,982 | 155,844 | 142,687 |
| Gross revenues | 530,063 | 570,648 | 559,266 |
| Gross average realized selling price (per dmt sold) | 158.7 | 165.1 | 146.0 |
Per Mine Cash Costs and AISC
| Q1 FY27 | Q1 FY26 | ||||||
| BloomLake | RanaGruber | Consolidated | BloomLake | RanaGruber | Consolidated | ||
| Iron ore concentrates sold (dmt) | 3,128,800 | 210,200 | 3,339,000 | 3,831,800 | -- | 3,831,800 | |
| Iron ore concentrates produced (dmt) | 3,437,500 | 364,700 | 3,802,200 | 3,412,300 | -- | 3,412,300 | |
| (in thousands of dollars, except per ton amount) | |||||||
| Mining and processing costs | 187,287 | 31,237 | 218,524 | 183,217 | -- | 183,217 | |
| Change in iron ore concentrates inventories | (22,028) | (13,450) | (35,478) | 37,539 | -- | 37,539 | |
| Land transportation and port handling costs | 95,694 | 595 | 96,289 | 93,172 | -- | 93,172 | |
| Purchase price allocation inventory adjustment | -- | 2,865 | 2,865 | -- | -- | -- | |
| Start-up costs | 6,551 | -- | 6,551 | -- | -- | -- | |
| Cost of sales (in $) | 267,504 | 21,247 | 288,751 | 313,928 | -- | 313,928 | |
| Less: Purchase price allocation inventory adjustment | -- | (2,865) | (2,865) | -- | -- | -- | |
| Less: Start-up costs | (6,551) | -- | (6,551) | -- | -- | -- | |
| Total cash cost (in $) | 260,953 | 18,382 | 279,335 | 313,928 | -- | 313,928 | |
| Add: Sustaining capital expenditures | 65,696 | 12,508 | 78,204 | 42,241 | -- | 42,241 | |
| Add: General and administrative expenses | -- | -- | 14,185 | -- | -- | 12,581 | |
| AISC (in $) | 326,649 | 30,890 | 371,724 | 356,169 | -- | 368,750 | |
| Mining and processing costs (per dmt produced) | 54.5 | 85.7 | 57.5 | 53.7 | -- | 53.7 | |
| Land transportation and port handling costs(per dmt sold) | 30.6 | 2.8 | 28.8 | 24.3 | -- | 24.3 | |
| Total cash cost (per dmt sold) | 83.4 | 87.5 | 83.7 | 81.9 | -- | 81.9 | |
| AISC (per dmt sold) | 104.4 | 147.0 | 111.3 | 93.0 | -- | 96.2 |
SOURCE Champion Iron Limited

Press Releases
Consult our newsletters (PDF) »
CHAMPION IRON APPOINTS STEVE BOUCRATIE AS CHIEF LEGAL & STRATEGY OFFICER AND CORPORATE SECRETARY AND MICHAEL MARCOTTE AS CHIEF FINANCIAL OFFICER
MONTRÉAL, July 15, 2026 /CNW/ - SYDNEY, July 16, 2026 - Champion Iron Limited (ASX: CIA) (TSX: CIA) (OTCQX: CIAFF) ("Champion" or the "Company") is pleased to announce the appointment of Steve Boucratie as Chief Legal & Strategy Officer and Corporate Secretary and Michael Marcotte as Chief Financial Officer.
Mr. Boucratie joined Champion in 2019 and most recently held the role of Senior Vice-president, General Counsel and Corporate Secretary. He brings extensive experience in corporate law, governance and strategic advisory, including over 15 years as senior management and roles in the mining industry and law firms. Since joining Champion, he has been instrumental in supporting the Company's legal, transactional and strategic initiatives, including financings, acquisitions and other key corporate developments. In his expanded role as Chief Legal & Strategy Officer, Mr. Boucratie will continue to lead legal affairs while contributing to the Company's corporate strategy and long-term growth initiatives.
Mr. Marcotte joined Champion in 2018 as Vice-President of Investor Relations and most recently held the role of Senior Vice-President of Corporate Development and Capital Markets. Mr. Marcotte holds a bachelor's degree in business administration and has obtained the Chartered Financial Analyst (CFA) designation. Since joining Champion, he has made a significant contribution to the Company's strategic development, leading key capital markets initiatives, including successful financings, and led the assessment of multiple growth opportunities and acquisitions. Prior to joining Champion, Mr. Marcotte built over 15 years of experience in the finance industry, developing strong expertise in analyzing and sourcing capital for natural resource companies.
"On behalf of the Board of Directors and management team, I am pleased to announce the appointments of Steve and Michael to these key leadership roles," said David Cataford, Champion's CEO. "Over the past several years, Steve and Michael have worked closely together and have played central roles in Champion's success. Their collaboration, leadership and deep understanding of our business will continue to be key assets for the Company and enable us to consolidate key responsibilities within the existing executive team. With the support of their teams and the broader senior leadership, Champion is well positioned to execute its vision and diligently advance its growth opportunities."
About Champion Iron Limited
Champion is a high-purity iron ore producer with operations in Canada and Norway. Through Quebec Iron Ore Inc., Champion owns and operates the Bloom Lake Mining Complex located on the south end of the Labrador Trough, approximately 13 kilometres north of Fermont, Québec. Bloom Lake is an open-pit operation with two concentration plants that primarily source energy from renewable hydroelectric power, having a combined nameplate capacity of 15M wet metric tonnes per year that produce low contaminant high-purity 66.2% Fe iron ore concentrate with a proven ability to produce a 67.5% Fe direct reduction quality iron ore concentrate. The iron ore concentrate from Bloom Lake is transported by rail, to a ship loading port in Sept-Îles, Québec. Benefiting from one of the highest purity resources globally, Champion is investing to be able to upgrade up to half of the Bloom Lake's mine capacity to a direct reduction quality pellet feed iron ore with up to 69% Fe. Bloom Lake's high-purity and lower contaminant iron ore products have attracted a premium to the P61 index (formerly the P62 index).
Champion also owns and operates Rana Gruber AS, a Norwegian iron ore producer based in Mo i Rana, Nordland. With continuous production dating back to the 1960's, Rana Gruber produces approximately 1.8M dry metric tonnes per year of hematite and magnetite iron ore concentrates.
Champion has delivered iron ore concentrates to global markets, including China, Japan, the Middle East, Europe, South Korea, India and Canada. In addition to its producing mines, Champion holds a 51% interest in Kami Iron Mine Partnership, jointly owned with Nippon Steel Corporation and Sojitz Corporation, through which the Kami Project is held. Located approximately 21 kilometres southeast of Bloom Lake, the Kami Project benefits from access to existing infrastructure. Champion also holds a portfolio of exploration and development projects in the Labrador Trough, including the Cluster II properties, which are situated within 60 kilometres south of Bloom Lake.
For additional information on Champion Iron Limited, please visit our website at: www.championiron.com .
This press release has been authorized for release to the market by the CEO of Champion Iron Limited, David Cataford.
SOURCE Champion Iron Limited

Nouvelles
Consultez notre infolettre (PDF) »
CHAMPION IRON ANNONCE LA DIFFUSION DE SES RÉSULTATS DU PREMIER TRIMESTRE DE L'EXERCICE FINANCIER 2027, LES DÉTAILS D'UN APPEL CONFÉRENCE ET UNE WEBDIFFUSION, ET LA DATE DE L'ASSEMBLÉE ANNUELLE DES ACTIONNAIRES
MONTRÉAL, le 7 juill. 2026 /CNW/ - SYDNEY, le 8 juillet 2026 - Champion Iron Limited (ASX : CIA) (TSX : CIA) (OTCQX : CIAFF) (« Champion » ou la « Société ») annonce qu'elle tiendra un appel conférence et une webdiffusion le 30 juillet 2026 à 9 h 00 (heure de Montréal) / 23 h 00 (heure de Sydney) au cours desquels les membres de sa haute direction discuteront des résultats opérationnels et financiers du premier trimestre terminé le 30 juin 2026 de l'exercice financier se terminant le 31 mars 2027.
Les états financiers et le rapport de gestion de Champion du trimestre terminé le 30 juin 2026 seront publiés avant l'appel conférence et la webdiffusion. Ceux-ci seront disponibles sur le site Internet de la Société dans la section « Rapports Réglementaires & Financiers » à l'adresse www.championiron.com , et sous le profil de la Société sur l'ASX à l'adresse www.asx.com.au et sur SEDAR+ à l'adresse www.sedarplus.ca .
Une retransmission audio de la conférence sera disponible pour une période de 90 jours sur le site Internet de Champion à l'adresse www.championiron.com/investisseurs/evenements-presentations .
Accès à la conférence téléphonique :
| Tel. local & outremer : | (+1) 416 945 7677 |
| Tel. Amérique du Nord : | (+1) 888 699 1199 |
| Tel. Australie : | (+61) 2 8017 1385 |
| Webdiffusion: | www.championiron.com/investisseurs |
| Retransmission Outremer : | (+1) 289 819 1450 |
| Retransmission Amérique du Nord : | (+1) 888 660 6345 |
| Numéro d'accès : | 84810 # |
| Expiration : | jeudi le 6 août 2026 à 23 h 59 (heure de Montréal) / vendredi le 7 août 2026 à 13 h 59 (heure de Sydney) |
Champion confirme également que son assemblée annuelle des actionnaires se tiendra le 26 août 2026 à 17 h 00 (heure de Montréal) / 27 août 2026 à 7 h 00 (heure de Sydney), et que la dernière date pour les nominations d'administrateurs sera le 16 juillet 2026 avant 3 h 00 (heure de Montréal) / 17 h 00 (heure de Sydney). Des informations supplémentaires concernant l'assemblée annuelle des actionnaires seront annoncées avant l'événement.
À propos de Champion Iron Limited
Champion est un producteur de minerai de fer de haute pureté, avec des activités au Canada et en Norvège. Par l'entremise de Minerai de fer Québec inc., Champion détient et exploite le complexe minier du Lac Bloom situé à l'extrémité sud de la Fosse du Labrador, à environ 13 kilomètres au nord de Fermont, Québec. La mine du Lac Bloom est une mine à ciel ouvert avec deux usines de concentration qui s'alimentent principalement en énergie hydroélectrique renouvelable, ayant une capacité nominale combinée de 15 millions de tonnes métriques humides par année. Les deux usines de concentration produisent du concentré de minerai de fer de haute pureté (66,2 % Fe) avec de faibles teneurs en contaminants et ont prouvé leur capacité à produire un concentré de qualité supérieure destiné à la réduction directe (67,5 % Fe). Le concentré de minerai de fer du Lac Bloom est expédié par rail jusqu'au port de chargement situé à Sept-Îles, Québec. Bénéficiant de l'une des ressources les plus pures au monde, Champion investit pour être en mesure de convertir jusqu'à la moitié de la capacité de la mine du Lac Bloom afin de produire du matériel de qualité réduction directe pour boulettes pouvant atteindre 69 % Fe. Les produits de minerai de fer de haute pureté et à plus faible teneur en contaminants du Lac Bloom ont su se mériter une prime par rapport à l'indice P61.
Champion détient et exploite également Rana Gruber AS, un producteur norvégien de minerai de fer établi à Mo i Rana, Nordland. Avec une production continue depuis les années 1960, Rana Gruber produit environ 1,8 million de tonnes métriques sèches par année de concentré de minerai de fer, d'hématite et de magnetite.
Champion a livré ses concentrés de minerai de fer à l'échelle mondiale, notamment en Chine, au Japon, au Moyen-Orient, en Europe, en Corée du Sud, en Inde et au Canada. En plus de ses mines en production, Champion détient une participation de 51 % dans Kami Iron Mine Partnership, en partenariat avec Nippon Steel Corporation et Sojitz Corporation, par l'intermédiaire duquel le projet Kami est détenu. Situé à environ 21 kilomètres au sud-est du Lac Bloom, le projet bénéficie d'un accès aux infrastructures existantes. Champion détient également un portefeuille de projets d'exploration et de développement dans la Fosse du Labrador, incluant les propriétés Cluster II, situées à moins de 60 kilomètres au sud du Lac Bloom.
Pour plus de renseignements sur Champion Iron Limited, veuillez visiter notre site Web à l'adresse : www.championiron.com .
La diffusion du présent communiqué a été autorisée par David Cataford, chef de la direction de Champion Iron Limited.
SOURCE Champion Iron Limited

Pour plus de renseignements: Pour plus de renseignements, veuillez contacter : [email protected]
[Champion Iron s'engage dans des projets performants,
à faible impact environnemental.
---------------------------------------------------------------------------------------
\
Investissez dans l'avenir brillant des mines\
‘Voir notre plus récent rapport d'activité»
](https://www.championiron.com/investisseurs/telecharger-le-guide-de-linvestisseur/?lang=fr)
Inscrivez-vous à l’infolettre Champion Iron
Voir tous les prix du marché »
Voir tous les prix du marché »
Siège social
Montréal
1155 René-Lévesque West
Suite 3300
Montréal QC H3B 3X7
Tél.: +1 514 316 4858
Téléc.: +1 514 871 8270
Australie
91, Evans Street
Rozelle NSW 2039
Tél.: +61 2 98107816
Téléc.: +61 2 86555017
Toronto
20, Adelaide Street East
Suite 200
Toronto ON M5C 2T6
Tél.: +1 416 866-2200
Sans frais (Amérique du Nord) :
+1 877 448-2201
Téléc.: +1 416 361-1333
Inscrivez-vous à l’infolettre Champion Iron pour suivre notre croissance
×
(opens in a new window)
Nouvelles
Consultez notre infolettre (PDF) »
CHAMPION IRON PRODUIT DU MINERAI DE FER DESTINÉ À LA RÉDUCTION DIRECTE DANS LE CADRE DE SON PROJET RDPB ET CONCLUT UN ACCORD COMMERCIAL
MONTRÉAL, le 28 juin 2026 /CNW/ - SYDNEY, le 29 juin 2026 - Champion Iron Limited (TSX : CIA) (ASX : CIA) (OTCQX : CIAFF) (« Champion » ou la « Société ») a le plaisir d'annoncer qu'elle a produit du minerai de fer destiné à la réduction directe (« RD ») dans le cadre de son projet de production de matériel de qualité réduction directe pour bouletage (le « projet RDPB ») à la mine du Lac Bloom (« Lac Bloom »). Une première vente commerciale d'un navire Capesize, devant transporter au moins 160 000 tonnes métriques humides de minerai de fer de qualité RD, est anticipée au troisième trimestre de l'année civile 2026. Le projet RDPB a été réalisé dans le respect du budget récemment estimé à 500 M$ et devrait voir sa capacité augmenter progressivement pour atteindre la production commerciale vers la fin de l'exercice financier en cours de la Société.
Parallèlement à la mise en service du projet RDPB, la Société a conclu un accord commercial couvrant une portion de sa capacité prévue à brève échéance et poursuit activement des discussions avec plusieurs clients potentiels, à l'échelle internationale, afin de conclure des ententes pour les volumes restants.
Le chef de la direction de Champion, M. David Cataford, a déclaré : « Le début de la production de minerai de fer de qualité RD marque une étape déterminante dans la mise en service du projet RDPB et témoigne, encore une fois, de la capacité de notre équipe à livrer des projets de construction d'envergure. En tirant parti de la qualité exceptionnelle des ressources de la Fosse du Labrador, notre accord commercial avec un groupe reconnu à l'échelle mondiale confirme la demande croissante pour du minerai de fer de qualité RD. Alors que nous progressons vers la production commerciale, nous visons à bâtir des partenariats durables avec des aciéristes, tout en renforçant la position du Québec et du Canada en tant qu'acteurs clés de la chaîne d'approvisionnement de l'acier à plus faible empreinte carbone. »
Le projet RDPB vise à convertir la moitié de la capacité du Lac Bloom pour produire du minerai de fer de qualité RD pour bouletage, à une teneur en fer atteignant 69 % Fe et une teneur combinée en silice et alumine inférieure à 1,2 %. Le projet RDPB permettra au Lac Bloom de se positionner parmi les producteurs de minerai de fer les plus purs au monde, et pourrait attirer une prime considérable par rapport au prix de son concentré de minerai de fer de haute pureté à 66,2 % Fe actuellement produit.
La demande et les prix plus avantageux pour le minerai de fer de qualité RD sont soutenus par la transition de l'industrie sidérurgique vers des méthodes de fabrication moins émissives, ce qui inclut notamment l'adoption croissante du fer à réduction directe (« FRD ») et des fours à arc électrique (« FAE ») pour produire de l'acier. Ces procédés nécessitent comme intrant du minerai de fer de plus haute pureté, comme le minerai de fer de qualité RD pour bouletage, afin d'atteindre des performances métallurgiques optimales et réduire l'intensité globale des émissions. Grâce au minerai de fer de haute pureté de la Fosse du Labrador, produit avec l'une des plus faibles empreintes carbone au monde en raison de l'accès à l'hydroélectricité, le Québec et le Canada sont bien positionnés pour agir comme fournisseurs stratégiques de minéraux critiques et contribuer à la décarbonation de l'industrie sidérurgique.
Champion remercie ses employés et ses partenaires, dont l'engagement et la collaboration ont rendu possible le succès du projet RDPB, consolidant ainsi la position du Lac Bloom comme chef de file de l'industrie du minerai de fer de haute pureté.
**À propos de Champion Iron Limited
**Champion est un producteur de minerai de fer de haute pureté, avec des activités au Canada et en Norvège. Par l'entremise de Minerai de fer Québec inc., Champion détient et exploite le complexe minier du Lac Bloom situé à l'extrémité sud de la Fosse du Labrador, à environ 13 kilomètres au nord de Fermont, Québec. La mine du Lac Bloom est une mine à ciel ouvert avec deux usines de concentration qui s'alimentent principalement en énergie hydroélectrique renouvelable, ayant une capacité nominale combinée de 15 millions de tonnes métriques humides par année. Les deux usines de concentration produisent du concentré de minerai de fer de haute pureté (66,2 % Fe) avec de faibles teneurs en contaminants et ont prouvé leur capacité à produire un concentré de qualité supérieure destiné à la réduction directe (67,5 % Fe). Le concentré de minerai de fer du Lac Bloom est expédié par rail jusqu'au port de chargement situé à Sept-Îles, Québec. Bénéficiant de l'une des ressources les plus pures au monde, Champion investit pour être en mesure de convertir jusqu'à la moitié de la capacité de la mine du Lac Bloom afin de produire du matériel de qualité réduction directe pour boulettes pouvant atteindre 69 % Fe. Les produits de minerai de fer de haute pureté et à plus faible teneur en contaminants du Lac Bloom ont su se mériter une prime par rapport à l'indice P61.
Champion détient et exploite également Rana Gruber AS, un producteur norvégien de minerai de fer établi à Mo i Rana, Nordland. Avec une production continue depuis les années 1960, Rana Gruber produit environ 1,8 million de tonnes métriques sèches par année de concentré de minerai de fer, d'hématite et de magnétite.
Champion a livré ses concentrés de minerai de fer à l'échelle mondiale, notamment en Chine, au Japon, au Moyen-Orient, en Europe, en Corée du Sud, en Inde et au Canada. En plus de ses mines en production, Champion détient une participation de 51 % dans Kami Iron Mine Partnership, en partenariat avec Nippon Steel Corporation et Sojitz Corporation, par l'intermédiaire duquel le projet Kami est détenu. Situé à environ 21 kilomètres au sud-est du Lac Bloom, le projet Kami bénéficie d'un accès aux infrastructures existantes. Champion détient également un portefeuille de projets d'exploration et de développement dans la Fosse du Labrador, incluant les propriétés Cluster II, situées à moins de 60 kilomètres au sud du Lac Bloom.
**Mise en garde à propos des énoncés prospectifs
**Le présent communiqué de presse contient de l'information et des énoncés qui peuvent constituer de l'« information prospective » aux termes de la législation sur les valeurs mobilières applicable (des « énoncés prospectifs »). Les énoncés prospectifs sont des énoncés qui ne sont pas des faits historiques et qui sont généralement, mais pas toujours, identifiés par l'emploi de termes comme « sera », « planifie », « s'attend à », « budgète », « est prévu », « estime », « continue », « prévoit », « projette », « prédit », « a l'intention de », « anticipe », « vise », « cible » ou « est d'avis », ou toute variation de ces termes, y compris leurs négatifs, ou des énoncés à l'effet que certaines actions et certains événements ou résultats « peuvent », « doivent », « pourraient », « devraient », « pourront » ou « devront » survenir, se réaliser ou être entrepris. Les énoncés prospectifs comportent des risques inhérents, des incertitudes et d'autres facteurs qui ne peuvent être prédits ni contrôlés par la Société.
**Énoncés prospectifs spécifiques
**Tous les énoncés autres que les énoncés de faits historiques compris dans le présent communiqué de presse, qui concernent des événements futurs, des développements ou des réalisations que Champion s'attend à voir se réaliser, sont des énoncés prospectifs. Les énoncés prospectifs peuvent comprendre, entre autres choses, les attentes de la direction concernant : le projet RDPB, incluant sa capacité de production, les prix plus avantageux, les ventes commerciales de minerai de fer de qualité RD et la production pour vente commerciale ainsi que le moment de leur réalisation, et les discussions connexes avec des clients potentiels et les attentes à l'égard de ces derniers; le changement des méthodes de production de l'industrie sidérurgique, la croissance prévue de la demande mondiale pour des produits de minerai de fer à plus haute pureté et de FRD, ainsi que les primes plus élevées qui s'en suivent, et la participation de la Société à ces efforts, sa contribution aux résultats et son positionnement en lien avec ces éléments et la croissance et les opportunités de la Société en général.
**Risques
**Bien que la Société croie que les attentes exprimées dans ces énoncés prospectifs sont basées sur des hypothèses raisonnables, de tels énoncés prospectifs sont sujets à des risques, incertitudes et autres facteurs connus et inconnus, dont la plupart sont hors du contrôle de la Société, ce qui peut faire en sorte de faire varier substantiellement les résultats, performances ou accomplissements réels de la Société par rapport à ceux qui sont exprimés ou sous-entendus dans ces énoncés prospectifs. Des facteurs susceptibles de causer de telles variations entre les résultats réels et ceux indiqués dans les énoncés prospectifs incluent, sans s'y limiter : (i) les prix du minerai de fer; (ii) les prix de l'énergie; (iii) les coûts d'exploitation; (iv) les coûts de transport; (v) les incertitudes générales économiques, concurrentielles, politiques et sociales; (vi) la disponibilité continue de capital et de financement ainsi que l'état général de l'économie, du marché et des affaires; (vii) le moment et l'incertitude du passage de l'industrie sidérurgique vers de nouvelles méthodes de production, et l'impact sur la demande pour du matériel d'alimentation à haute pureté; (viii) des défaillances des usines, des équipements ou des processus à opérer comme prévu, y compris ceux des fournisseurs tiers ou des contreparties; (ix) des retards dans l'obtention d'approbations gouvernementales, des permis nécessaires ou dans l'achèvement d'activités de développement ou de construction; (x) les résultats des études de faisabilité; (xi) les changements aux hypothèses utilisées dans le cadre des études de faisabilité; (xii) les délais dans les projets; (xiii) les événements géopolitiques; et (xiv) les effets de catastrophes et de crises de santé publique sur l'économie mondiale, le marché du minerai de fer et les opérations de Champion, ainsi que les facteurs traités dans la section sur les facteurs de risque du rapport de gestion de la Société pour l'exercice financier terminé le 31 mars 2026, disponible sous le profil de la Société auprès de l'ASX à l'adresse www.asx.com.au
, sur SEDAR+ à l'adresse www.sedarplus.ca
et sur le site Web de la Société à l'adresse www.championiron.com
.
Rien ne garantit que l'un ou l'autre des énoncés prospectifs se révélera exact, les résultats réels et les événements futurs pouvant être sensiblement différents de ceux prévus dans les énoncés prospectifs. Les lecteurs ne doivent donc pas se fier outre mesure aux énoncés prospectifs.
**Mises à jour ultérieures
**Tous les énoncés prospectifs dans le présent communiqué de presse sont donnés en date des présentes ou à toute autre date spécifiée dans les énoncés prospectifs et sont fondés sur les jugements et les estimations de la direction de Champion et sur l'information dont la direction dispose à la date des présentes. Champion décline toute intention ou obligation de mettre à jour ou de réviser ses énoncés prospectifs, notamment à la lumière de nouveaux renseignements ou d'événements futurs, à moins que la législation ne l'y oblige. Si la Société publie une mise à jour de l'un ou de plusieurs des énoncés prospectifs, l'on ne doit pas supposer que d'autres mises à jour suivront à propos de ces énoncés prospectifs ou d'autres énoncés prospectifs. Champion met en garde le lecteur à l'effet que la liste de risques et d'incertitudes ci-dessus n'est pas exhaustive. Les lecteurs devraient considérer les facteurs ci-dessus avec attention, ainsi que les incertitudes qu'ils représentent et les risques qu'ils comportent.
Pour plus de renseignements : [email protected]
Pour plus de renseignements sur Champion Iron Limited, veuillez visiter notre site Web à l'adresse : www.championiron.com .
La diffusion du présent communiqué de presse a été autorisée par David Cataford, chef de la direction de Champion Iron Limited.
SOURCE Champion Iron Limited

[Champion Iron s'engage dans des projets performants,
à faible impact environnemental.
---------------------------------------------------------------------------------------
\
Investissez dans l'avenir brillant des mines\
‘Voir notre plus récent rapport d'activité»
](https://www.championiron.com/investisseurs/telecharger-le-guide-de-linvestisseur/?lang=fr)
Inscrivez-vous à l’infolettre Champion Iron
Voir tous les prix du marché »
Voir tous les prix du marché »
Siège social
Montréal
1155 René-Lévesque West
Suite 3300
Montréal QC H3B 3X7
Tél.: +1 514 316 4858
Téléc.: +1 514 871 8270
Australie
91, Evans Street
Rozelle NSW 2039
Tél.: +61 2 98107816
Téléc.: +61 2 86555017
Toronto
20, Adelaide Street East
Suite 200
Toronto ON M5C 2T6
Tél.: +1 416 866-2200
Sans frais (Amérique du Nord) :
+1 877 448-2201
Téléc.: +1 416 361-1333
Inscrivez-vous à l’infolettre Champion Iron pour suivre notre croissance
×
(opens in a new window)
Press Releases
Consult our newsletters (PDF) »
CHAMPION IRON PRODUCES DR QUALITY IRON ORE FROM ITS DRPF PROJECT AND ENTERS INTO COMMERCIAL AGREEMENT
MONTRÉAL, June 28, 2026 /CNW/ - SYDNEY, June 29, 2026 – Champion Iron Limited (TSX: CIA) (ASX: CIA) (OTCQX: CIAFF) ("Champion" or the "Company") is pleased to announce having produced direct reduction ("DR") quality iron ore from its direct reduction pellet feed project (the "DRPF Project") at the Bloom Lake mine (the "Bloom Lake"). An inaugural commercial sale of a Capesize vessel, expected to carry at least 160,000 wet metric tonnes of DR quality iron ore is anticipated in the third calendar quarter of 2026. The DRPF Project was completed within the recently estimated $500 million budget and is expected to gradually increase in capacity to reach commercial production toward the end of the Company's current financial year.
In tandem with the commissioning of the DRPF Project, the Company has entered into a commercial agreement covering a portion of its expected near-term capacity and is actively advancing discussions with several prospective customers globally to secure agreements for its remaining volumes.
Champion's CEO, Mr. David Cataford, said: "The initial production of DR quality iron ore represents a defining milestone in the commissioning of the DRPF Project and, once again, highlights our team's ability to deliver sizeable construction projects. By leveraging the exceptional quality of the resources in the Labrador Trough, our commercial agreement with a globally recognized group confirms the growing demand for DR quality iron ore. As we progress toward commercial production, we seek to build long-term partnerships with steelmakers, while strengthening Québec's and Canada's position as a key player in the low-carbon steelmaking supply chain."
The DRPF Project is designed to upgrade half of Bloom Lake's capacity to a DR quality pellet feed iron ore grading up to 69% Fe, with combined silica and alumina content below 1.2. The DRPF Project is expected to position Bloom Lake among the highest-purity iron ore producers globally, and could attract a considerable pricing premium over its currently produced high-purity 66.2% Fe iron ore concentrate.
Demand and pricing premiums for DR quality iron ore are supported by the steel industry's transition toward lower-carbon production pathways, including an increasing adoption of direct reduced iron ("DRI") and electric arc furnaces ("EAF") steelmaking. These processes require higher-purity iron ore inputs, such as DR quality pellet feed iron ore, to achieve optimal metallurgical performance and reduce overall emissions intensity. With the Labrador Trough's high-purity iron ore products and access to hydroelectricity, resulting in one of the lowest carbon footprints for high-purity iron ore production globally, Québec and Canada are well positioned to expand their roles as strategic suppliers of critical minerals and contribute to the decarbonization of the steel industry.
Champion thanks its employees and partners, whose dedication and collaboration enabled the success of the DRPF Project, consolidating Bloom Lake's position as a leader in the high-purity iron ore industry.
**About Champion Iron Limited
**Champion is a high-purity iron ore producer with operations in Canada and Norway. Through Quebec Iron Ore Inc., Champion owns and operates the Bloom Lake Mining Complex located on the south end of the Labrador Trough, approximately 13 kilometres north of Fermont, Québec. Bloom Lake is an open-pit operation with two concentration plants that primarily source energy from renewable hydroelectric power, having a combined nameplate capacity of 15M wmt per year that produce low contaminant high-purity 66.2% Fe iron ore concentrate with a proven ability to produce a 67.5% Fe direct reduction quality iron ore concentrate. The iron ore concentrate from Bloom Lake is transported by rail, to a ship loading port in Sept-Îles, Québec. Benefiting from one of the highest purity resources globally, Champion is investing to be able to upgrade up to half of the Bloom Lake's mine capacity to a direct reduction quality pellet feed iron ore with up to 69% Fe. Bloom Lake's high-purity and lower contaminant iron ore products have attracted a premium to the P61 index (formerly, the P62 index).
Champion also owns and operates Rana Gruber AS, a Norwegian iron ore producer based in Mo i Rana, Nordland. With continuous production dating back to the 1960's, Rana Gruber produces approximately 1.8M dmt per year of hematite and magnetite iron ore concentrates.
Champion has delivered iron ore concentrates to global markets, including China, Japan, the Middle East, Europe, South Korea, India and Canada. In addition to its producing mines, Champion holds a 51% interest in the Kami Iron Mine Partnership, jointly owned with Nippon Steel Corporation and Sojitz Corporation, through which the Kami Project is held. Located approximately 21 kilometres southeast of Bloom Lake, the Kami Project benefits from access to existing infrastructure. Champion also holds a portfolio of exploration and development projects in the Labrador Trough, including the Cluster II properties, situated within 60 kilometres south of Bloom Lake.
**Cautionary Note Regarding Forward-Looking Statements
**This press release contains certain information and statements that may constitute "forward-looking information" under applicable securities legislation ("Forward-Looking Statements"). Forward-Looking Statements are statements that are not historical facts and are generally, but not always, identified by the use of words such as "will", "plans", "expects", "is expected", "budget", "scheduled", "estimates", "continues", "forecasts", "projects", "predicts", "intends", "anticipates", "aims", "targets" or "believes", or variations of, or the negatives of, such words and phrases or state that certain actions, events or results "may", "could", "would", "should", "might" or "will" be taken, occur or be achieved. Inherent in Forward-Looking Statements are risks, uncertainties and other factors beyond the Company's ability to predict or control.
**Specific Forward-Looking Statements
**All statements, other than statements of historical facts, included in this press release that address future events, developments or performance that Champion expects to occur are Forward-Looking Statements. Forward-Looking Statements may include, among other things, Management's expectations regarding: the DRPF Project, including its capacity, pricing premiums, commercial sales of DR quality iron ore and commercial production and the timing thereof, and related engagement with, and expectations with respect to, prospective customers; the shift in steel industry production methods, expected rising demand for higher-purity iron ore products and DRI globally and related higher premiums, and the Company's participation therein, contribution thereto and positioning in connection therewith; and the Company's growth and opportunities generally.
**Risks
**Although the Company believes the expectations expressed in such Forward-Looking Statements are based on reasonable assumptions, such Forward-Looking Statements involve known and unknown risks, uncertainties and other factors, most of which are beyond the control of the Company, which may cause the Company's actual results, performance or achievements to differ materially from those expressed or implied by such Forward-Looking Statements. Factors that could cause actual results to differ materially from those expressed in Forward-Looking Statements include, without limitation: (i) iron ore prices; (ii) energy prices; (iii) operating costs; (iv) freight costs; (v) general economic, competitive, political and social uncertainties; (vi) continued availability of capital and financing and general economic, market or business conditions; (vii) timing of and uncertainty regarding the steel industry shift in production methods, impacting demand for high-purity feed; (viii) failure of plant, equipment or processes, including those of third party providers or counterparties, to operate as anticipated; (ix) delays in obtaining governmental approvals, necessary permitting or in the completion of development or construction activities; (x) the results of feasibility studies; (xi) changes in the assumptions used to prepare feasibility studies; (xii) project delays; (xiii) geopolitical events; and (xiv) the effects of catastrophes and public health crises on the global economy, the iron ore market and Champion's operations, as well as those factors discussed in the section entitled "Risk Factors" of the Company's Management's Discussion and Analysis for the financial year ended March 31, 2026 available under the Company's profile on the ASX at www.asx.com.au
, SEDAR+ at www.sedarplus.ca
and the Company's website at www.championiron.com
.
There can be no assurance that any such Forward-Looking Statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such Forward-Looking Statements. Accordingly, readers should not place undue reliance on Forward-Looking Statements.
**Additional Updates
**All of the Forward-Looking Statements contained in this press release are given as of the date hereof or such other date or dates specified in the Forward-Looking Statements and are based upon the judgment and estimates of Champion's Management and information available to Management as at the date hereof. Champion disclaims any intention or obligation to update or revise any of the Forward-Looking Statements, whether as a result of new information, future events or otherwise, except as required by law. If the Company does update one or more Forward-Looking Statements, no inference should be drawn that it will make additional updates with respect to those or other Forward-Looking Statements. Champion cautions that the foregoing list of risks and uncertainties is not exhaustive. Readers should carefully consider the above factors as well as the uncertainties they represent and the risks they entail.
Nouvelles
Consultez notre infolettre (PDF) »
CHAMPION IRON ANNONCE SES RÉSULTATS POUR LE QUATRIÈME TRIMESTRE DE L'EXERCICE FINANCIER 2026
-
Production trimestrielle de 3,4 Mtmh, ventes de 3,5 Mtms, produits de 415 M$ et BAIIA de 114 M$1
-
La mise en service du projet RDPB progresse comme prévu; les premiers essais de production ont été complétés avec succès en mars 2026 et la production d'un produit pour vente commerciale est prévue d'ici la fin du deuxième trimestre de l'année civile 2026
-
L'acquisition précédemment annoncée de Rana Gruber, un producteur norvégien de minerai de fer de haute pureté de premier plan, a été finalisée en avril 2026
-
Annonce d'un cadre régissant les futures distributions aux actionnaires
MONTRÉAL, le 27 mai 2026 /CNW/ - SYDNEY, le 28 mai 2026 - Champion Iron Limited (ASX : CIA) (TSX : CIA) (OTCQX : CIAFF) (« Champion » ou la « Société ») annonce ses résultats opérationnels et financiers pour son quatrième trimestre financier terminé le 31 mars 2026.
Le chef de la direction de Champion, M. David Cataford, a déclaré : « Cette année marque le dixième anniversaire de l'acquisition de la mine du Lac Bloom par Champion en avril 2016, une étape déterminante qui a jeté les bases de notre vision à long terme. Portée par une équipe engagée, la mise en œuvre réussie de multiples projets de croissance et la récente acquisition de Rana Gruber, Champion continue de se démarquer auprès de clients, à l'échelle mondiale, en tant que fournisseur de minerai de fer de haute pureté de premier plan. Au-delà de nos réalisations opérationnelles, nous sommes fiers de créer de la valeur à long terme pour toutes nos parties prenantes grâce à de solides partenariats avec les gouvernements, les communautés locales et les Premières Nations. Alors que nous approchons de la fin d'un cycle d'investissements majeurs qui s'est échelonné sur plusieurs années au site du Lac Bloom, la préservation de nos liquidités s'inscrit au cœur de nos priorités, dans un contexte marqué par la volatilité macroéconomique, ainsi que par la hausse des coûts du carburant et du transport. À l'avenir, notre politique de dividendes révisée permettra d'aligner les rendements pour nos actionnaires sur la capacité financière de notre société. »
Détails relatifs à la conférence téléphonique
Champion tiendra une conférence téléphonique et une webdiffusion le 28 mai 2026 à 9 h 00 (heure de Montréal) / 23 h 00 (heure de Sydney) pour discuter des résultats du quatrième trimestre et de l'exercice financier terminés le 31 mars 2026. Les détails relatifs à la conférence téléphonique sont fournis à la fin du présent communiqué de presse.
1. Faits saillants du trimestre
Opérations et développement durable
- Aucun accident de travail sérieux ni incident environnemental majeur n'a été signalé durant le trimestre terminé le 31 mars 2026;
- La plupart des objectifs annuels en matière de développement durable fixés dans le précédent rapport de développement durable de la Société, qui intégrait les cadres de divulgation correspondant aux meilleures pratiques de l'industrie, soit ceux du Global Reporting Initiative, du Sustainability Accounting Standards Board et du Groupe de travail sur l'information financière relative aux changements climatiques, ont été atteints ou dépassés;
- Production trimestrielle de 3,4 Mtmh de concentré de haute pureté (66,2 % Fe) pour le trimestre terminé le 31 mars 2026, en progression de 8 % comparativement à la même période de l'année précédente, et comparable à la production du deuxième trimestre de l'exercice financier 2026, au cours duquel la Société avait aussi procédé à l'entretien semestriel planifié des deux usines de concentration;
- Ventes trimestrielles de 3,5 Mtms pour le trimestre terminé le 31 mars 2026, un résultat comparable à la même période de l'année précédente, malgré une interruption des services ferroviaires provoquée par le déraillement d'un train exploité par un tiers ayant impacté les opérations jusqu'au 12 janvier 2026, suivie de perturbations persistantes. Les activités de l'opérateur du chemin de fer sont revenues à la normale de façon progressive, dans un contexte de conditions hivernales particulièrement difficiles;
- Les stocks de concentré de minerai de fer accumulés au Lac Bloom et au port de Sept-Îles ont diminué pour s'établir à 1,3 Mtmh au 31 mars 2026 comparativement à 1,5 Mtmh au 31 décembre 2025;
- Solide performance minière au Lac Bloom, avec 20,9 Mtmh de matériel extrait et transporté durant le trimestre terminé le 31 mars 2026, en hausse de 3 % comparativement à la même période de l'année précédente, grâce à l'utilisation accrue et améliorée des équipements de chargement et de forage, et à la disponibilité des camions de halage; et
- Le Conseil a approuvé un cadre révisé de distributions aux actionnaires pour les dividendes futurs, conçu afin de s'adapter aux conditions du marché. Dans le cadre de cette politique de dividendes, la Société vise à verser des dividendes semestriels équivalant à 30 % à 40 % des flux de trésorerie disponibles sur les six derniers mois, avec la possibilité de dividendes spéciaux à la discrétion du Conseil (la « Politique de dividendes »). La Politique de dividendes offre une flexibilité permettant des distributions de dividendes potentiellement plus élevées lors de périodes de résultats financiers solides et d'investissements en capital modestes, tout en préservant le bilan de la Société en période de rentabilité plus basse et de besoins en capitaux plus élevés. La Politique de dividendes s'appliquera aux résultats semestriels de l'exercice 2027. Dans une optique de préservation de la liquidité de la Société, et en réponse aux conditions macroéconomiques volatiles, le Conseil a déclaré un dividende semestriel de 0,02 $ par action ordinaire le 27 mai 2026 (Montréal) / 28 mai 2026 (Sydney), en lien avec les résultats annuels pour la période terminée le 31 mars 2026.
Résultats financiers
- Prix de vente moyen réalisé brut de 120,5 $ US/tms1, comparativement au prix moyen de l'indice P65 de 120,8 $ US/tms pour la période;
- Prix de vente moyen réalisé net de 87,5 $ US/tms1, en hausse de 1 % d'un trimestre à l'autre et de 3 % d'une année à l'autre;
- Coût comptant C1 pour le concentré de minerai de fer chargé sur les navires au port de Sept-Îles totalisant 82,7 $/tms1 (60,3 $ US/tms)2, en hausse de 12 % d'un trimestre à l'autre, en raison principalement de l'entretien semestriel planifié des deux usines de concentration, et en hausse de 3 % d'une année à l'autre. Le coût comptant C1 pour la période a été impacté par les volumes inférieurs transportés jusqu'aux installations portuaires en raison de perturbations du service ferroviaire et des conditions hivernales difficiles, ainsi que par la hausse substantielle des prix du carburant, à la fin du trimestre, découlant du conflit au Moyen-Orient;
- Résultat net de 23,2 M$, ce qui représente un BPA de 0,04 $, comparativement à un résultat net de 65,0 M$ (BPA de 0,12 $) au trimestre précédent et un résultat net de 39,1 M$ (BPA de 0,08 $) pour la même période de l'année précédente;
- BAIIA de 114,3 M$1, comparativement à 152,4 M$1 au trimestre précédent et à 127,4 M$1 à la même période de l'année précédente;
- Le solde de trésorerie, en excluant la portion inutilisée des contributions en espèces initiales de Nippon Steel Corporation (« Nippon Steel ») et Sojitz Corporation (« Sojitz », et collectivement avec Nippon Steel, les « partenaires ») détenue dans un compte de trésorerie de Kami Iron Mine Partnership (le « partenariat Kami ») réservé à l'usage de la Société, totalisait 296,8 M$ au 31 mars 2026, en hausse de 51,7 M$ depuis le 31 décembre 2025, bénéficiant des robustes flux de trésorerie nets générés par les activités d'exploitation, alors que la Société a continué de faire avancer son projet RDPB et d'investir dans des projets d'investissement durables; et
- Solides liquidités disponibles pour soutenir les initiatives de croissance et les besoins généraux de l'entreprise totalisant 812,4 M$1 au 31 mars 2026, comparativement à 751,4 M$1 au 31 décembre 2025.
Mise à jour sur le projet RDPB
- Le projet RDPB, qui vise à convertir jusqu'à la moitié de la capacité du Lac Bloom pour produire du minerai de fer de qualité RD pour bouletage d'une teneur allant jusqu'à 69 % Fe, a progressé comme prévu. Le début de la production pour vente commerciale est anticipé d'ici la fin juin 2026 avec une augmentation graduelle des volumes de production par la suite;
- Les activités de mise en service ont progressé parallèlement aux travaux de construction, avec un renforcement des vérifications préopérationnelles et la mise en service à l'eau, ce qui a permis de compléter avec succès les premiers essais de production en mars 2026; et
- Les investissements trimestriels et cumulatifs s'élevaient à 39,0 M$ et 479,5 M$, respectivement, au 31 mars 2026, comparativement à un investissement cumulatif estimé à 500 M$.
Projets en développement et autres initiatives de croissance
- Le 17 avril 2026, la Société a conclu l'acquisition de 100 % des actions de Rana Gruber ASA (« Rana Gruber »), un producteur norvégien de minerai de fer de haute pureté de premier plan. L'acquisition a été clôturée à un prix d'acquisition total d'environ 300 millions de dollars américains, frais et dépenses connexes en sus (l'« acquisition »), qui a été financé grâce à une combinaison d'une nouvelle facilité de prêt à terme garanti d'un montant de 150 millions de dollars américains de quatre ans (le « prêt à terme »), du produit net d'un placement privé d'actions de 100 millions de dollars américains réalisé avec la Caisse de dépôt et placement du Québec, et des liquidités disponibles. De plus amples détails concernant l'acquisition sont disponibles dans le communiqué de presse de la Société daté du 10 avril 2026 (Montréal), disponible sous son profil auprès de l'ASX à l'adresse www.asx.com.au , sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à l'adresse www.championiron.com ;
- En lien avec l'acquisition, Champion et certaines de ses filiales ont refinancé les facilités de crédit de premier rang syndiquées de la Société en date du 1er avril 2026 afin, notamment, de reporter l'échéance jusqu'en avril 2030, d'établir le prêt à terme et d'apporter des modifications à la facilité de crédit renouvelable garantie de premier rang de 400 millions de dollars américains, notamment pour tenir compte de l'acquisition;
- Le partenariat Kami a reçu une contribution financière de Ressources naturelles Canada, dans le cadre du Fonds du premier et du dernier kilomètre (anciennement le Fonds pour l'infrastructure des minéraux critiques), afin de faire progresser l'étude de faisabilité afférente aux principales infrastructures énergétiques et de transport du projet Kami; et
- Poursuite des travaux dans le cadre de l'étude de faisabilité définitive (« EFD ») du projet Kami, laquelle devrait être complétée au deuxième semestre de l'année civile 2026.
2. Activités d'exploitation à la mine du Lac Bloom
La Société effectue l'entretien planifié de ses deux usines en tandem, aux deuxième et quatrième trimestres financiers, ce qui peut générer des variations marquées d'un trimestre à l'autre au niveau de la production et des coûts d'extraction minière et de traitement.
| T4 Exercice 2026 | T3 Exercice 2026 | Variation trimestrielle | T4 Exercice 2025 | Variation annuelle | |||
| Données d'exploitation | |||||||
| Stérile extrait et transporté (tmh) | 10 979 800 | 12 088 600 | (9 %) | 10 886 200 | 1 % | ||
| Minerai extrait et transporté (tmh) | 9 915 100 | 10 549 700 | (6 %) | 9 470 100 | 5 % | ||
| Matériel extrait et transporté (tmh) | 20 894 900 | 22 638 300 | (8 %) | 20 356 300 | 3 % | ||
| Ratio de déblaiement | 1,11 | 1,15 | (3 %) | 1,15 | (3 %) | ||
| Minerai broyé (tmh) | 9 744 200 | 10 443 200 | (7 %) | 9 160 300 | 6 % | ||
| Teneur d'alimentation (% Fe) | 28,8 | 29,1 | (1 %) | 29,2 | (1 %) | ||
| Récupération du Fe (%) | 80,6 | 79,7 | 1 % | 78,3 | 3 % | ||
| Teneur du produit (% Fe) | 66,2 | 66,5 | -- % | 66,5 | -- % | ||
| Concentré de minerai de fer produit (tmh) | 3 435 100 | 3 661 400 | (6 %) | 3 167 000 | 8 % | ||
| Concentré de minerai de fer vendu (tms) | 3 455 400 | 3 895 300 | (11 %) | 3 495 300 | (1 %) |
Le Lac Bloom a produit 3,4 Mtmh de concentré de minerai de fer de haute pureté (66,2 % Fe) au cours du trimestre terminé le 31 mars 2026, en progression de 8 % comparativement à la même période en 2025, principalement attribuable à la productivité et à la récupération du fer plus élevées, et partiellement contrebalancées par une teneur d'alimentation plus basse. Durant le trimestre terminé le 31 mars 2026, le taux de récupération du fer a grimpé à 80,6 % par rapport à 78,3 % lors de la même période en 2025, bénéficiant du rendement accru des systèmes gravimétriques grâce à l'application de programmes de travaux et à l'optimisation des opérations. Tout en sachant que les taux de récupération du fer peuvent fluctuer en fonction du plan minier et de ses variations dans la teneur d'alimentation, la Société poursuivra ses efforts pour améliorer et stabiliser ses taux de récupération du fer au fil du temps.
Le volume des ventes de concentré de minerai de fer durant le trimestre terminé le 31 mars 2026 était comparable à la même période de l'année précédente et a surpassé la production pour le cinquième trimestre consécutif, alors que la Société a continué de réduire ses stocks de concentré de minerai de fer accumulés au Lac Bloom et au port de Sept-Îles. Les volumes vendus ont été affectés par le déraillement d'un train exploité par un tiers qui a impacté les services ferroviaires au début de la période, suivie de perturbations qui ont persisté sur une grande partie du trimestre. Malgré cet impact, le cumul des stocks de concentré de minerai de fer au Lac Bloom et au port totalisait 1,3 Mtmh au 31 mars 2026, comparativement à 1,5 Mtmh au 31 décembre 2025. La Société évalue présentement ses stratégies de gestion des stocks au site minier et au port en prévision des changements à venir au niveau de son offre de produits avec l'arrivée de minerai de fer de qualité RDPB. Elle vise ainsi à maintenir ses stocks de produits de minerai de fer pour vente commerciale à des niveaux adéquats, tout en gérant les stocks de minerai de fer de différentes qualités, ainsi que la logistique de production et de vente.
Durant le trimestre terminé le 31 mars 2026, la Société a extrait et transporté 20,9 Mtmh de stériles et de minerai, surpassant le volume de 20,4 Mtmh enregistré à la même période de l'année précédente. Cette solide performance minière reflète l'ajout d'équipements de chargement et la récente mise en service d'une nouvelle foreuse, ainsi que de meilleurs taux d'utilisation et de disponibilité des camions de halage. Le ratio de déblaiement pour le trimestre terminé le 31 mars 2026 s'est établi à 1,11, comparativement au ratio de 1,15 enregistré à la même période de l'année précédente. Champion prévoit maintenir cette cadence de déblaiement lors des périodes à venir, conformément à son plan sur la durée de vie de la mine.
3. Rendement financier
| T4 Exercice 2026 | T3 Exercice 2026 | Variation trimestrielle | T4 Exercice 2025 | Variation annuelle | |||
| Données financières (en milliers de dollars) | |||||||
| Produits | 414 505 | 472 309 | (12 %) | 425 345 | (3 %) | ||
| Coût des ventes | 285 785 | 287 712 | (1 %) | 279 644 | 2 % | ||
| Autres dépenses | 27 893 | 28 747 | (3 %) | 19 619 | 42 % | ||
| Charges financières nettes | 19 733 | 2 101 | 839 % | 11 286 | 75 % | ||
| Résultat net | 23 186 | 64 972 | (64 %) | 39 140 | (41 %) | ||
| BAIIA1 | 114 340 | 152 408 | (25 %) | 127 378 | (10 %) | ||
| Statistiques (en dollars par tms vendue) | |||||||
| Prix de vente moyen réalisé brut1 | 165,1 | 162,9 | 1 % | 160,4 | 3 % | ||
| Prix de vente moyen réalisé net1 | 120,0 | 121,3 | (1 %) | 121,7 | (1 %) | ||
| Coût comptant C11 | 82,7 | 73,9 | 12 % | 80,0 | 3 % | ||
| CMTI1 | 96,9 | 89,7 | 8 % | 93,1 | 4 % | ||
| Marge d'exploitation1 | 23,1 | 31,6 | (27 %) | 28,6 | (19 %) |
A. Produits
Les produits ont totalisé 414,5 M$ pour le trimestre terminé le 31 mars 2026, en baisse de 10,8 M$ comparativement aux produits de 425,3 M$ enregistrés à la même période en 2025. Tel qu'indiqué dans la section ci-dessus, malgré les volumes de ventes similaires, les produits plus bas sont attribuables à la vigueur du dollar canadien durant le trimestre terminé le 31 mars 2026, comparativement à la même période l'an dernier, partiellement compensée par le prix de vente moyen réalisé net plus élevé en dollars américains.
Pour le trimestre terminé le 31 mars 2026, le prix de vente moyen réalisé brut de 120,5 $ US/tms1 était pratiquement identique à l'indice P65 moyen de 120,8 $ US/tms. Les 2,3 Mtms de minerai de fer sujettes à des ajustements de prix au 31 mars 2026 ont été évaluées à un prix de vente à terme moyen de 120,2 $ US/tms, ce qui est comparable au prix moyen de l'indice P65 pour la période. Par ailleurs, les prix des indices utilisés dans le cadre des contrats de vente basés sur des prix fixés de façon rétrospective étaient aussi comparables au prix moyen de l'indice P65 pour la période. Au cours du trimestre, la Société a continué à se préparer pour la transition vers un produit RDPB de plus haute pureté et a intentionnellement réduit les volumes vendus en vertu de contrats de vente à long terme afin de rendre une plus grande proportion de ses volumes de minerai de fer disponible sur les marchés à court terme et au comptant, qui ont récemment connu une plus grande volatilité ainsi que des réductions de prix.
Des ajustements de prix provisoires négatifs liés aux ventes du trimestre précédent de 0,3 M$ ont été comptabilisés durant le trimestre terminé le 31 mars 2026, ce qui représente un impact défavorable de 0,1 $ US/tms sur les 3,5 Mtms vendues au cours du trimestre. Un prix de vente final moyen de 117,2 $ US/tms a été établi pour les 2,5 Mtms de minerai de fer sujettes à des ajustements de prix au 31 décembre 2025, qui avaient été provisoirement évaluées à 117,4 $ US/tms.
Les frais de transport maritime et autres coûts ont totalisé 32,9 $ US/tms durant le trimestre terminé le 31 mars 2026, ce qui représente une hausse de 18 % comparativement aux frais de 28,0 $ US/tms enregistrés à la même période de l'année précédente, reflétant principalement la hausse de 27 % de l'indice C3 moyen. Les frais de transport maritime comptabilisés au cours de la période ne reflètent que partiellement la hausse des taux du marché découlant de l'intensification du conflit en Iran. La remontée de l'indice C3 observée en mars 2026 devrait être reflétée au prochain trimestre, puisque Champion réserve typiquement ses navires de trois à cinq semaines avant la période de disponibilité désirée.
En tenant compte des frais de transport maritime et autres coûts de 32,9 $ US/tms et des ajustements de prix provisoires négatifs de 0,1 $ US/tms, la Société a enregistré un prix de vente moyen réalisé net de 87,5 $ US/tms (120,0 $ CA/tms1) pour son concentré de minerai de fer de haute pureté expédié au cours du trimestre terminé le 31 mars 2026.
B. Coût des ventes et coût comptant C1
Pour le trimestre terminé le 31 mars 2026, le coût des ventes a totalisé 285,8 M$, avec un coût comptant C1 de 82,7 $/tms1, comparativement à 279,6 M$ avec un coût comptant C1 de 80,0 $/tms1 à la même période en 2025.
Malgré une hausse importante des prix pour le carburant à la fin du trimestre, attribuable au conflit au Moyen-Orient, les coûts d'extraction minière et de traitement du minerai ont totalisé 60,0 $/tms produite1 pour le trimestre terminé le 31 mars 2026, ce qui représente une diminution de 3 % comparativement aux coûts de 62,0 $/tms produite1 à la même période de l'année précédente, en raison principalement d'une hausse de 8 % des volumes de production.
Les coûts de transport terrestre et de manutention portuaire comprennent des composantes fixes et variables, et sont grandement influencés par les volumes transportés de Fermont jusqu'au port de Sept-Îles. Bien que les volumes expédiés aient été nettement inférieurs à ceux de la période comparative, les coûts sont restés comparables. La diminution des volumes, découlant du déraillement de train et des conditions hivernales difficiles, mentionné précédemment, a mené à une réduction des remises sur volumes et de l'amortissement des coûts fixes. L'indexation semestrielle des prix contractuels a aussi contribué à l'augmentation des coûts de transport terrestre et de manutention portuaire au cours du trimestre. Malgré ces facteurs, les coûts de transport terrestre et de manutention portuaire par tonne vendue pour le trimestre terminé le 31 mars 2026 se sont établis à 23,8 $/tms vendue1, un niveau comparable à la période de l'année précédente, reflétant les volumes de ventes comparables.
Le coût comptant C1 a aussi été affecté par les variations de l'évaluation des stocks de concentré de minerai de fer, qui tient compte des coûts d'extraction minière et de traitement du minerai engagés au trimestre précédent, ainsi que par les variations des volumes de production et de ventes.
C. Résultat net et BAIIA
Pour le trimestre terminé le 31 mars 2026, la Société a généré un résultat net de 23,2 M$ (BPA de 0,04 $), comparativement à 39,1 M$ (BPA de 0,08 $) à la même période de l'année précédente. Ces diminutions sont principalement attribuables à la marge bénéficiaire réduite et à une perte de change latente découlant de la réévaluation de passifs monétaires nets libellés en dollars américains, en partie compensées par la variation de la juste valeur des actifs dérivés et la diminution des impôts sur le revenu et des impôts miniers.
Pour le trimestre terminé le 31 mars 2026, la Société a généré un BAIIA de 114,3 M$1, ce qui représente une marge BAIIA de 28 %1, comparativement à 127,4 M$, ce qui représente une marge BAIIA de 30 %1, pour la même période en 2025. Avec des volumes de ventes comparables, le BAIIA et la marge BAIIA plus faibles sont principalement attribuables à la vigueur du dollar canadien comparativement à la même période l'an dernier, qui a eu un impact défavorable sur le prix de vente moyen réalisé net, et au coût comptant plus élevé, partiellement compensé par une augmentation de la juste valeur des actifs dérivés.
D. Coût de maintien tout inclus et marge d'exploitation
Pour le trimestre terminé le 31 mars 2026, la Société a enregistré un CMTI de 96,9 $/tms1, comparativement à 93,1 $/tms1 à la même période en 2025. Cette augmentation reflète principalement les dépenses générales et administratives et le coût comptant plus élevés, tandis que les dépenses en immobilisations de maintien étaient dans l'ensemble conformes à celles de la période comparative.
La Société a généré une marge d'exploitation de 23,1 $/tms1 pour chaque tonne de concentré de minerai de fer de haute pureté vendue au cours du trimestre terminé le 31 mars 2026, comparativement à 28,6 $/tms1 à la même période de l'année précédente. Cette diminution reflète principalement le CMTI plus élevé pour la période.
4. Informations relatives à la conférence téléphonique et à sa webdiffusion
Une webdiffusion et une conférence téléphonique au cours desquelles les résultats ci-dessus seront abordés plus en détail auront lieu le 28 mai 2026 à 9 h 00 (heure de Montréal) / 23 h 00 (heure de Sydney). Les auditeurs pourront suivre une webdiffusion en direct de la conférence téléphonique à la section Investisseurs du site Web de la Société à l'adresse www.championiron.com/investisseurs/evenements-presentations ou en composant sans frais le +1-888-699-1199 en Amérique du Nord ou le +61-2-8017-1385 en Australie.
La webdiffusion sera archivée en ligne à des fins de consultation et sera disponible sur le site Web de la Société à l'adresse www.championiron.com/investisseurs/evenements-presentations . Une rediffusion téléphonique sera également disponible dans la semaine suivant la conférence téléphonique, en composant le +1-888-660-6345 en Amérique du Nord ou le +1-289-819-1450 outremer, puis en composant le code d'accès 43604#.
À propos de Champion Iron Limited
Champion est un producteur de minerai de fer de haute pureté, avec des activités au Canada et en Norvège. Par l'entremise de Minerai de fer Québec inc., Champion détient et exploite le complexe minier du Lac Bloom situé à l'extrémité sud de la Fosse du Labrador, à environ 13 kilomètres au nord de Fermont, Québec. La mine du Lac Bloom est une mine à ciel ouvert avec deux usines de concentration qui s'alimentent principalement en énergie hydroélectrique renouvelable, ayant une capacité nominale combinée de 15 millions de tonnes métriques humides par année. Les deux usines de concentration produisent du concentré de minerai de fer de haute pureté (66,2 % Fe) avec de faibles teneurs en contaminants et ont prouvé leur capacité à produire un concentré de qualité supérieure destiné à la réduction directe (67,5 % Fe). Le concentré de minerai de fer du Lac Bloom est expédié par rail jusqu'au port de chargement situé à Sept-Îles, Québec. Bénéficiant de l'une des ressources les plus pures au monde, Champion investit pour être en mesure de convertir jusqu'à la moitié de la capacité de la mine du Lac Bloom afin de produire du matériel de qualité réduction directe pour boulettes pouvant atteindre 69 % Fe. Les produits de minerai de fer de haute pureté et à plus faible teneur en contaminants du Lac Bloom ont su se mériter une prime par rapport à l'indice P61.
Depuis le 10 avril 2026, Champion détient et exploite également Rana Gruber, un producteur norvégien de minerai de fer établi à Mo i Rana, Nordland. Avec une production continue depuis les années 1960, Rana Gruber produit environ 1,8 million de tonnes métriques sèches par année de concentré de minerai de fer, d'hématite et de magnétite.
Champion a livré ses concentrés de minerai de fer à l'échelle mondiale, notamment en Chine, au Japon, au Moyen-Orient, en Europe, en Corée du Sud, en Inde et au Canada. En plus de ses mines en production, Champion détient une participation de 51 % dans le partenariat Kami, en partenariat avec Nippon Steel et Sojitz. Le projet est situé à proximité d'infrastructures existantes, à seulement 21 kilomètres au sud-est du Lac Bloom. Champion détient également un portefeuille de projets d'exploration et de développement dans la Fosse du Labrador, incluant les propriétés Cluster II, situées à moins de 60 kilomètres au sud du Lac Bloom.
Mise en garde à propos des énoncés prospectifs
Le présent communiqué de presse contient de l'information et des énoncés qui peuvent constituer de l'« information prospective » aux termes de la législation sur les valeurs mobilières applicable (des « énoncés prospectifs »). Les énoncés prospectifs sont des énoncés qui ne sont pas des faits historiques et qui sont généralement, mais pas toujours, identifiés par l'emploi de termes comme « sera », « planifie », « s'attend à », « budgète », « est prévu », « estime », « continue », « prévoit », « projette », « prédit », « a l'intention de », « anticipe », « vise », « cible » ou « est d'avis », ou toute variation de ces termes, y compris leurs négatifs, ou des énoncés à l'effet que certaines actions et certains événements ou résultats « peuvent », « doivent », « pourraient », « devraient », « pourront » ou « devront » survenir, se réaliser ou être entrepris. Les énoncés prospectifs comportent des risques inhérents, des incertitudes et d'autres facteurs qui ne peuvent être prédits ni contrôlés par la Société.
Énoncés prospectifs spécifiques
Tous les énoncés autres que les énoncés de faits historiques compris dans le présent communiqué de presse, qui concernent des événements futurs, des développements ou des réalisations que Champion s'attend à voir se réaliser, sont des énoncés prospectifs. Les énoncés prospectifs peuvent comprendre, entre autres choses, les attentes de la direction concernant : (i) la durée de vie de la mine du Lac Bloom, les taux de récupération et les efforts visant à améliorer ces taux, la production, les retombées économiques et autres, la capacité nominale et les occasions et avantages associés; (ii) le projet visant à valoriser le concentré de minerai de fer du Lac Bloom à un degré de pureté plus élevé et à convertir près de la moitié de la capacité minière accrue du Lac Bloom afin de produire du minerai de fer destiné à la réduction directe pour bouletage (le projet RDPB), l'échéancier de réalisation anticipé du projet RDPB, incluant les délais anticipés jusqu'au début de la production pour vente commerciale et l'atteinte de la pleine capacité de production, les paramètres de production ainsi que le moment de leur réalisation; (iii) l'évaluation des stratégies visant à optimiser les rendements du capital; (iv) l'étude du projet Kami et l'échéancier prévu pour son achèvement; (v) la Politique de dividendes (telle que définie ci-dessus) ainsi que la stratégie globale de distributions aux actionnaires et les politiques connexes, les résultats escomptés et les stratégies alternatives; (vi) le changement des méthodes de production de l'industrie sidérurgique, la croissance prévue de la demande mondiale pour des produits de minerai de fer à plus haute pureté et de fer préréduit (DRI), ainsi que le déficit de marché et les primes plus élevées qui s'en suivent, et la participation de la Société à ces efforts, sa contribution aux résultats et son positionnement en lien avec ces éléments, incluant la transition de l'offre de produits de la Société (y compris la production de produits RDPB de haute pureté), son expansion géographique, l'élargissement de ses marchés et de sa clientèle, les investissements connexes ainsi que les avantages attendus; (vii) le maintien d'activités de déblaiement accrues; (viii) les stratégies de gestion des stocks de minerai afin de maintenir des niveaux adéquats de produits de minerai de fer commercialisables entreposés; (ix) le lien entre les prix pour le minerai de fer et les frais de transport maritime (y compris les perspectives quant à l'indice C3) et l'impact sur la Société; (x) l'avis de la Société concernant les mesures non conformes aux IFRS et les autres mesures financières, y compris l'utilité de ces mesures permettant aux investisseurs de mieux comprendre les résultats de la Société et sa capacité à générer des résultats d'exploitation, de comparer les résultats d'exploitation entre les périodes, d'évaluer le rendement des activités de la Société, d'évaluer ses liquidités et ses flux de trésorerie servant à financer ses besoins en fonds de roulement et ses dépenses d'investissement et assurer le service de la dette; (xi) l'avis de la Société concernant la conformité aux lois et aux règlements applicables, notamment le fait que la Société dispose de tous les permis, licences et approbations requis pour exercer ses activités; et (xii) les initiatives stratégiques et de croissance et les opportunités de la Société en général, leur potentiel d'optimisation des rendements pour les actionnaires, le calendrier de communication de ces éléments.
Risques
Bien que la Société croie que les attentes exprimées dans ces énoncés prospectifs sont basées sur des hypothèses raisonnables, de tels énoncés prospectifs sont sujets à des risques, incertitudes et autres facteurs connus et inconnus, dont la plupart sont hors du contrôle de la Société, ce qui peut faire en sorte de faire varier substantiellement les résultats, performances ou accomplissements réels de la Société par rapport à ceux qui sont exprimés ou sous-entendus dans ces énoncés prospectifs. Des facteurs susceptibles de causer de telles variations entre les résultats réels et ceux indiqués dans les énoncés prospectifs incluent, sans s'y limiter : (i) les prix du minerai de fer; (ii) les prix de l'énergie; (iii) les coûts d'exploitation; (iv) les coûts de transport; (v) les incertitudes générales économiques, concurrentielles, politiques et sociales; (vi) la disponibilité continue de capital et de financement ainsi que l'état général de l'économie, du marché et des affaires; (vii) le moment et l'incertitude du passage de l'industrie sidérurgique vers de nouvelles méthodes de production, et l'impact sur la demande pour du matériel d'alimentation à haute pureté; (viii) des défaillances des usines, des équipements ou des processus à opérer comme prévu, y compris ceux des fournisseurs tiers ou des contreparties; (ix) des retards dans l'obtention d'approbations gouvernementales, des permis nécessaires ou dans l'achèvement d'activités de développement ou de construction; (x) les résultats des études de faisabilité; (xi) les changements aux hypothèses utilisées dans le cadre des études de faisabilité; (xii) les délais dans les projets; (xiii) les événements géopolitiques; et (xiv) les effets de catastrophes et de crises de santé publique sur l'économie mondiale, le marché du minerai de fer et les opérations de Champion, ainsi que les facteurs traités dans la section sur les facteurs de risque du rapport de gestion de la Société pour l'exercice financier terminé le 31 mars 2026, disponible sous le profil de la Société auprès de l'ASX à l'adresse www.asx.com.au, sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à l'adresse www.championiron.com .
Rien ne garantit que l'un ou l'autre des énoncés prospectifs se révélera exact, les résultats réels et les événements futurs pouvant être sensiblement différents de ceux prévus dans les énoncés prospectifs. Les lecteurs ne doivent donc pas se fier outre mesure aux énoncés prospectifs.
Mises à jour ultérieures
Tous les énoncés prospectifs dans le présent communiqué de presse sont donnés en date des présentes ou à toute autre date spécifiée dans les énoncés prospectifs et sont fondés sur les jugements et les estimations de la direction de Champion et sur l'information dont la direction dispose à la date des présentes. Champion décline toute intention ou obligation de mettre à jour ou de réviser ses énoncés prospectifs, notamment à la lumière de nouveaux renseignements ou d'événements futurs, à moins que la législation ne l'y oblige. Si la Société publie une mise à jour de l'un ou de plusieurs des énoncés prospectifs, l'on ne doit pas supposer que d'autres mises à jour suivront à propos de ces énoncés prospectifs ou d'autres énoncés prospectifs. Champion met en garde le lecteur à l'effet que la liste de risques et d'incertitudes ci-dessus n'est pas exhaustive. Les lecteurs devraient considérer les facteurs ci-dessus avec attention, ainsi que les incertitudes qu'ils représentent et les risques qu'ils comportent.
Abréviations
Sauf indication contraire, tous les montants en dollars indiqués dans les présentes sont libellés en dollars canadiens. Les abréviations suivantes sont utilisées tout au long de ce communiqué de presse : $ US (dollar américain), Conseil (conseil d'administration de Champion), Fe (minerai de fer), tmh (tonne métrique humide), tms (tonne métrique sèche), M (million), km (kilomètre), Lac Bloom ou mine du Lac Bloom (complexe minier du Lac Bloom), RD (réduction directe), RDPB (réduction directe pour bouletage), projet Kami (projet Kamistiatusset), indice C3 (indice Capesize C3 de la bourse baltique), indice P61 (indice Platts IODEX CFR Chine pour le minerai de fer à 61 % Fe), indice P62 (indice Platts IODEX CFR Chine pour le minerai de fer à 62 % Fe), indice P65 (indice Platts IODEX CFR Chine pour le minerai de fer à 65 % Fe), BAIIA (bénéfice avant les impôts sur le revenu et les impôts miniers, les charges financières nettes et l'amortissement) et BPA (bénéfice par action). L'utilisation de « Champion » ou de la « Société » fait référence à Champion Iron Limited et/ou à l'une ou plusieurs ou toutes ses filiales, selon le cas, et « IFRS » fait référence aux Normes internationales d'information financière telles qu'émises par l'International Accounting Standards Board.
Pour plus de renseignements sur Champion Iron Limited, veuillez visiter notre site Web à l'adresse : www.championiron.com .
La diffusion du présent communiqué de presse a été autorisée par le conseil d'administration.
Les états financiers consolidés audités de la Société et le rapport de gestion connexe pour l'exercice terminé le 31 mars 2026 sont disponibles sous le profil de la Société auprès de l'ASX (www.asx.com.au ), sur SEDAR+ (www.sedarplus.ca ) et sur le site Web de la Société (www.championiron.com ) à compter du 28 mai 2026.
| ____________________________________ | |
| 1 | Il s'agit d'une mesure financière ou d'un ratio non conforme aux IFRS, ou d'une autre mesure financière. La mesure n'est pas une mesure financière standardisée en vertu du cadre de présentation de l'information financière utilisé pour préparer les états financiers et pourrait ne pas être comparable à des mesures financières similaires utilisées par d'autres émetteurs. Se reporter à la section ci-dessous -- Mesures non conformes aux IFRS et autres mesures financières, pour les définitions de ces mesures et un rapprochement avec la mesure conforme aux IFRS la plus directement comparable, le cas échéant. D'autres détails sur ces mesures non conformes aux IFRS et autres mesures financières ont été intégrés par renvoi et peuvent être consultés à la rubrique 22 du rapport de gestion de la Société pour l'exercice terminé le 31 mars 2026, disponible auprès de l'ASX à l'adresse www.asx.com.au, sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à la section Investisseurs à l'adresse www.championiron.com. |
| 2 | Se reporter à la rubrique 7 du rapport de gestion pour l'exercice terminé le 31 mars 2026, disponible auprès de l'ASX à l'adresse www.asx.com.au, sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à la section Investisseurs à l'adresse www.championiron.com. |
Mesures non conformes aux IFRS et autres mesures financières
La Société a inclus certaines mesures financières et ratios non conformes aux IFRS et d'autres mesures financières dans le présent communiqué de presse afin d'offrir aux investisseurs de l'information additionnelle leur permettant d'évaluer le rendement sous-jacent de la Société. Ces mesures sont principalement tirées des états financiers, mais n'ont pas de définition officielle en vertu des IFRS et pourraient donc ne pas être comparables à des mesures similaires présentées par d'autres sociétés. La direction est d'avis que ces mesures, en plus des mesures conventionnelles préparées conformément aux IFRS, permettent aux investisseurs de mieux comprendre les résultats des activités de la Société. Les mesures non conformes aux IFRS et les autres mesures financières ne devraient pas être considérées isolément ou comme substituts aux mesures de rendement préparées conformément aux IFRS. L'exclusion de certains éléments des mesures financières non conformes aux IFRS n'implique pas nécessairement que ces éléments ne sont pas récurrents.
La Société présente certaines de ses mesures non conformes aux IFRS et de ses autres mesures financières en dollars américains et en dollars canadiens, afin de faciliter la comparaison avec les mesures présentées par d'autres sociétés.
BAIIA et marge BAIIA
| (en milliers de dollars) | T4 Exercice 2026 | T3 Exercice 2026 | T4 Exercice 2025 | |
| Bénéfice avant les impôts sur le revenu et les impôts miniers | 51 078 | 105 456 | 74 646 | |
| Charges financières nettes | 19 733 | 2 101 | 11 286 | |
| Amortissement | 43 529 | 44 851 | 41 446 | |
| BAIIA | 114 340 | 152 408 | 127 378 | |
| Produits | 414 505 | 472 309 | 425 345 | |
| Marge BAIIA | 28 % | 32 % | 30 % |
Liquidités disponibles
| Au 31 mars | Au 31 décembre | |||
| (en milliers de dollars) | 2026 | 2025 | ||
| Trésorerie et équivalents de trésorerie | 296 788 | 245 092 | ||
| Montants disponibles en vertu des facilités de crédit | 515 600 | 506 340 | ||
| Liquidités disponibles | 812 388 | 751 432 |
Coût comptant C1
| T4 Exercice 2026 | T3 Exercice 2026 | T4 Exercice 2025 | ||
| Concentré de minerai de fer vendu (tms) | 3 455 400 | 3 895 300 | 3 495 300 | |
| (en milliers de dollars, sauf les montants par tms) | ||||
| Coût des ventes | 285 785 | 287 712 | 279 644 | |
| Coût comptant C1 (par tms vendue) | 82,7 | 73,9 | 80,0 |
Coût de maintien tout inclus
| T4 Exercice 2026 | T3 Exercice 2026 | T4 Exercice 2025 | ||
| Concentré de minerai de fer vendu (tms) | 3 455 400 | 3 895 300 | 3 495 300 | |
| (en milliers de dollars, sauf les montants par tms) | ||||
| Coût des ventes | 285 785 | 287 712 | 279 644 | |
| Dépenses en immobilisations de maintien | 31 162 | 46 956 | 33 230 | |
| Dépenses générales et administratives | 17 836 | 14 744 | 12 457 | |
| 334 783 | 349 412 | 325 331 | ||
| CMTI (par tms vendue) | 96,9 | 89,7 | 93,1 |
Marge d'exploitation et marge bénéficiaire
| T4 Exercice 2026 | T3 Exercice 2026 | T4 Exercice 2025 | ||
| Concentré de minerai de fer vendu (tms) | 3 455 400 | 3 895 300 | 3 495 300 | |
| (en milliers de dollars, sauf les montants par tms) | ||||
| Produits | 414 505 | 472 309 | 425 345 | |
| Prix de vente moyen réalisé net (par tms vendue) | 120,0 | 121,3 | 121,7 | |
| CMTI (par tms vendue) | 96,9 | 89,7 | 93,1 | |
| Marge d'exploitation (par tms vendue) | 23,1 | 31,6 | 28,6 | |
| Marge bénéficiaire | 19 % | 26 % | 24 % |
Prix de vente moyen réalisé brut par tms vendue
| T4 Exercice 2026 | T3 Exercice 2026 | T4 Exercice 2025 | |
| Concentré de minerai de fer vendu (tms) | 3 455 400 | 3 895 300 | 3 495 300 |
| (en milliers de dollars, sauf les montants par tms) | |||
| Produits | 414 505 | 472 309 | 425 345 |
| Ajustements de prix provisoires | 299 | (4 373) | (5 389) |
| Frais de transport maritime et autres coûts | 155 844 | 166 539 | 140 627 |
| Produits bruts | 570 648 | 634 475 | 560 583 |
| Prix de vente moyen réalisé brut (par tms vendue) | 165,1 | 162,9 | 160,4 |
SOURCE Champion Iron Limited

Pour plus de renseignements: Pour plus de renseignements : Champion Iron Limited, Michael Marcotte, CFA, Vice-président sénior au développement corporatif et aux marchés des capitaux, +1-514-316-4858, poste 1128, [email protected]
[Champion Iron s'engage dans des projets performants,
à faible impact environnemental.
---------------------------------------------------------------------------------------
\
Investissez dans l'avenir brillant des mines\
‘Voir notre plus récent rapport d'activité»
](https://www.championiron.com/investisseurs/telecharger-le-guide-de-linvestisseur/?lang=fr)
Inscrivez-vous à l’infolettre Champion Iron
Voir tous les prix du marché »
Voir tous les prix du marché »
Siège social
Montréal
1155 René-Lévesque West
Suite 3300
Montréal QC H3B 3X7
Tél.: +1 514 316 4858
Téléc.: +1 514 871 8270
Australie
91, Evans Street
Rozelle NSW 2039
Tél.: +61 2 98107816
Téléc.: +61 2 86555017
Toronto
20, Adelaide Street East
Suite 200
Toronto ON M5C 2T6
Tél.: +1 416 866-2200
Sans frais (Amérique du Nord) :
+1 877 448-2201
Téléc.: +1 416 361-1333
Inscrivez-vous à l’infolettre Champion Iron pour suivre notre croissance
×
(opens in a new window)
Press Releases
Consult our newsletters (PDF) »
CHAMPION IRON REPORTS ITS FY2026 FOURTH QUARTER RESULTS
-
Quarterly production of 3.4M wmt, sales of 3.5M dmt, revenues of $415M and EBITDA of $114M1
-
DRPF project commissioning advancing as planned, with initial production tests successfully completed in March 2026 and production of commercially saleable product expected by the end of calendar Q2 2026
-
The previously announced acquisition of Rana Gruber, a proven high-purity iron ore producer in Norway, closed in April 2026
-
Announced the framework for future shareholder returns
MONTRÉAL, May 27, 2026 /CNW/ - SYDNEY, May 28, 2026 - Champion Iron Limited (ASX: CIA) (TSX: CIA) (OTCQX: CIAFF) ("Champion" or the "Company") reports operational and financial results for its financial fourth quarter ended March 31, 2026.
Champion's CEO, Mr. David Cataford, said, "This year marks the tenth anniversary of Champion's acquisition of Bloom Lake mine in April 2016, a defining milestone that laid the foundation for our long-term vision. Supported by an engaged workforce, the successful execution of multiple growth projects, and the recent acquisition of Rana Gruber, Champion continues to distinguish itself with customers worldwide as a leading supplier of high-purity iron ore. Beyond our operational achievements, we are proud to create lasting value for all stakeholders through strong partnerships with governments, local communities and First Nations. Although we are near the completion of a multi-year growth capital investment cycle at Bloom Lake, our focus is to protect our financial liquidities in response to the volatile macroeconomic environment and rising fuel and freight prices. Looking forward, our revised dividend policy will align our shareholder returns with our Company's financial capacity."
Conference Call Details
Champion will host a conference call and webcast on May 28, 2026, at 9:00 AM (Montréal time) / 11:00 PM (Sydney time) to discuss the results of the fourth quarter and financial year ended March 31, 2026. The conference call details are set out at the end of this press release.
1. Quarterly Highlights
Operations and Sustainability
- No serious workplace-related injuries or major environmental incidents were reported during the three-month period ended March 31, 2026;
- Met or exceeded most annual sustainability targets set in the Company's previous sustainability report, which incorporated industry best practice disclosure frameworks, including the Global Reporting Initiative, the Sustainability Accounting Standards Board and the Task Force on Climate-Related Financial Disclosures;
- Quarterly production of 3.4 million wmt of high-purity 66.2% Fe concentrate for the three-month period ended March 31, 2026, an 8% increase over the same prior-year period, and comparable to that of the second quarter of the 2026 financial year, during which the Company also completed scheduled semi-annual maintenance at both concentration plants;
- Quarterly sales of 3.5 million dmt for the three-month period ended March 31, 2026, comparable to the same prior-year period, despite a railway interruption caused by a third-party train derailment that impacted operations until January 12, 2026, with continued rail service disruptions thereafter until the rail operator's activities resumed to normal, as well as particularly challenging winter conditions;
- Iron ore concentrate stockpiled at Bloom Lake and at the Port of Sept-Îles decreased to 1.3 million wmt as at March 31, 2026, from 1.5 million wmt as at December 31, 2025;
- Strong mining performance at Bloom Lake with 20.9 million wmt of material mined and hauled during the three-month period ended March 31, 2026, an increase of 3% compared to the same prior-year period, driven by additional and improved utilization of loading and drilling equipment and haul trucks availability; and
- Champion's Board has approved a revised shareholder return framework for future dividends designed to adapt to market conditions. Under this dividend policy, the Company aims to provide semi-annual dividends equivalent of 30% to 40% of the Company's trailing six-month free cash flows, with the potential for special dividends at the discretion of the Board (the "Dividend Policy"). The Dividend Policy provides flexibility for potentially higher dividend distributions in periods of strong financial results and low capital investments, while preserving the Company's balance sheet in periods of softer profitability and increased capital requirements. The Dividend Policy will apply to the semi-annual results of the 2027 financial year. While maintaining a focus on preserving the Company's liquidity in response to volatile macroeconomic conditions, the Board declared a semi-annual dividend of $0.02 per ordinary share on May 27, 2026 (Montréal) / May 28, 2026 (Sydney), in connection with the annual results for the period ended March 31, 2026.
Financial Results
- Gross average realized selling price of US$120.5/dmt1, compared to the P65 index average price of US$120.8/dmt in the period;
- Net average realized selling price of US$87.5/dmt1, an increase of 1% quarter-over-quarter and 3% year-over-year;
- C1 cash cost for the iron ore concentrate loaded onto vessels at the Port of Sept-Îles totalled $82.7/dmt1 (US$60.3/dmt)2, an increase of 12% quarter-over-quarter, mainly attributable to the scheduled semi-annual maintenance at both concentration plants, and an increase of 3% year-over-year. C1 cash cost for the period was negatively impacted by lower volumes transported to the port yard facilities due to rail service disruptions and severe winter conditions, along with a significant rise in fuel prices at the end of the quarter attributable to the conflict in the Middle East;
- Net income of $23.2 million, representing EPS of $0.04, compared to net income of $65.0 million with EPS of $0.12 in the previous quarter, and net income of $39.1 million with EPS of $0.08 in the same prior-year period;
- EBITDA of $114.3 million1, compared to $152.4 million1 in the previous quarter and $127.4 million1 in the same prior-year period;
- Cash balance, excluding the unused portion of the initial cash contributions from Nippon Steel Corporation ("Nippon Steel") and Sojitz Corporation ("Sojitz", and collectively with Nippon Steel, the "Partners") that is held in a restricted cash account by Kami Iron Mine Partnership (the "Kami Partnership"), totalled $296.8 million as at March 31, 2026, an increase of $51.7 million since December 31, 2025, benefiting from robust net cash flows from operating activities, while the Company continued to advance the DRPF project and invest in sustainable capital expenditures; and
- Strong available liquidity of $812.4 million1 as at March 31, 2026, compared to $751.4 million1 as at December 31, 2025, supporting growth initiatives and general corporate purposes.
DRPF Project Update
- DRPF project, designed to upgrade up to half of Bloom Lake's capacity to DR quality pellet feed iron ore grading up to 69% Fe, progressed as planned. The initial saleable production anticipated to occur by the end of June 2026, with production volumes gradually increasing thereafter;
- Commissioning activities advanced concurrently with construction work, with the strengthening of pre-operational verifications and wet commissioning, enabling the successful completion of the initial production tests in March 2026; and
- Quarterly and cumulative investments totalled $39.0 million and $479.5 million, respectively, as at March 31, 2026, compared to an estimated cumulative investment of $500 million.
Development and Other Growth Initiatives
- On April 17, 2026, the Company completed the acquisition of 100% of the shares of Rana Gruber ASA ("Rana Gruber"), a leading Norwegian producer of high-purity iron ore. The acquisition was completed at a total purchase price of approximately US$300 million, plus related fees and expenses (the "Acquisition"), which was funded by a combination of a newly secured 4-year US$150 million term loan (the "Term Loan"), the net proceeds of an equity private placement of US$100 million from Caisse de dépôt et placement du Québec, and cash on hand. Additional details on the Acquisition are provided in the Company's press release dated April 10, 2026 (Montréal), available under its profile on the ASX at www.asx.com.au , SEDAR+ at www.sedarplus.ca and the Company's website at www.championiron.com ;
- In connection with the Acquisition, Champion and certain of its subsidiaries refinanced the Company's syndicated senior credit facilities, effective on April 1, 2026, in order to, among other things, extend the maturity to April 2030, establish the Term Loan and amend the US$400 million senior secured revolving credit facility, including to take into account the Acquisition;
- The Kami Partnership received financial support from Natural Resources Canada, under the First and Last Mile Fund (formerly, the Critical Minerals Infrastructure Fund), to advance feasibility work for the Kami Project's key energy and transportation infrastructure; and
- Continued work on the Kami Project's definitive feasibility study ("DFS"), which is expected to be completed in the second half of the 2026 calendar year.
2. Bloom Lake Mine Operating Activities
The Company performs both its plants' scheduled maintenance in the second and fourth financial quarters, which may create significant quarter-over-quarter variances in production output and mining and processing costs.
| Q4 FY26 | Q3 FY26 | Q/Q Change | Q4 FY25 | Y/Y Change | |||
| Operating Data | |||||||
| Waste mined and hauled (wmt) | 10,979,800 | 12,088,600 | (9) % | 10,886,200 | 1 % | ||
| Ore mined and hauled (wmt) | 9,915,100 | 10,549,700 | (6) % | 9,470,100 | 5 % | ||
| Material mined and hauled (wmt) | 20,894,900 | 22,638,300 | (8) % | 20,356,300 | 3 % | ||
| Stripping ratio | 1.11 | 1.15 | (3) % | 1.15 | (3) % | ||
| Ore milled (wmt) | 9,744,200 | 10,443,200 | (7) % | 9,160,300 | 6 % | ||
| Head grade Fe (%) | 28.8 | 29.1 | (1) % | 29.2 | (1) % | ||
| Fe recovery (%) | 80.6 | 79.7 | 1 % | 78.3 | 3 % | ||
| Product Fe (%) | 66.2 | 66.5 | -- % | 66.5 | -- % | ||
| Iron ore concentrate produced (wmt) | 3,435,100 | 3,661,400 | (6) % | 3,167,000 | 8 % | ||
| Iron ore concentrate sold (dmt) | 3,455,400 | 3,895,300 | (11) % | 3,495,300 | (1) % |
Bloom Lake produced 3.4 million wmt of high-purity 66.2% Fe concentrate during the three-month period ended March 31, 2026, an 8% increase over the same period in 2025, mainly attributable to higher mill productivity and Fe recovery, partially offset by lower head grade. During the three-month period ended March 31, 2026, the Fe recovery rate increased to 80.6% from 78.3% for the same period in 2025, benefiting from improved performance of the gravimetric systems, following work programs and operational optimizations. While Fe recovery rates are expected to fluctuate in accordance with the mine plan and variations in ore grade, the Company remains focused on improving and stabilizing Fe recovery rates over time.
Iron ore concentrate sales volumes during the three-month period ended March 31, 2026, were comparable to the same prior-year period, and exceeded production for the fifth consecutive quarter, as the Company continued to destock iron ore concentrate inventories stockpiled at Bloom Lake and at the Port of Sept-Îles. Volumes sold were affected by a third-party train derailment that impacted rail services early in the period, with disruptions affecting a significant portion of the quarter. Despite this impact, cumulative iron ore concentrate inventories at Bloom Lake and at the port totalled 1.3 million wmt as at March 31, 2026, compared to 1.5 million wmt as at December 31, 2025. The Company is currently evaluating its on-site and port inventory management strategies in anticipation of the expected change to its product offering with DRPF quality iron ore, in order to maintain adequate levels of stockpiled iron ore saleable products, manage inventories of different iron ore qualities, production and sales logistics.
During the three-month period ended March 31, 2026, the Company mined and hauled 20.9 million wmt of waste and ore, exceeding the 20.4 million wmt recorded in the same prior-year period. This strong mining performance was driven by the addition of loading equipment and the recent commissioning of a new drill, as well as improved utilization and availability of haul trucks. The stripping ratio for the three-month period ended March 31, 2026 was 1.11, compared to a 1.15 ratio recorded in the same prior-year period. Champion anticipates maintaining this stripping cadence in upcoming periods, consistent with its LoM plan.
3. Financial Performance
| Q4 FY26 | Q3 FY26 | Q/Q Change | Q4 FY25 | Y/Y Change | |||
| Financial Data (in thousands of dollars) | |||||||
| Revenues | 414,505 | 472,309 | (12) % | 425,345 | (3) % | ||
| Cost of sales | 285,785 | 287,712 | (1) % | 279,644 | 2 % | ||
| Other expenses | 27,893 | 28,747 | (3) % | 19,619 | 42 % | ||
| Net finance costs | 19,733 | 2,101 | 839 % | 11,286 | 75 % | ||
| Net income | 23,186 | 64,972 | (64) % | 39,140 | (41) % | ||
| EBITDA1 | 114,340 | 152,408 | (25) % | 127,378 | (10) % | ||
| Statistics (in dollars per dmt sold) | |||||||
| Gross average realized selling price1 | 165.1 | 162.9 | 1 % | 160.4 | 3 % | ||
| Net average realized selling price1 | 120.0 | 121.3 | (1) % | 121.7 | (1) % | ||
| C1 cash cost1 | 82.7 | 73.9 | 12 % | 80.0 | 3 % | ||
| AISC1 | 96.9 | 89.7 | 8 % | 93.1 | 4 % | ||
| Cash operating margin1 | 23.1 | 31.6 | (27) % | 28.6 | (19) % |
A. Revenues
Revenues totalled $414.5 million for the three-month period ended March 31, 2026, a decrease of $10.8 million from $425.3 million in the same period in 2025. As outlined in the previous section, with similar sales volumes, lower revenues were attributable to a stronger Canadian dollar during the three-month period ended March 31, 2026, compared to the same period last year, partially offset by a higher average net realized selling price in U.S. dollars.
For the three-month period ended March 31, 2026, the gross average realized selling price of US$120.5/dmt1 was in line with the P65 index average price of US$120.8/dmt. The 2.3 million dmt of iron ore subject to pricing adjustments as at March 31, 2026, were evaluated using an average forward selling price of US$120.2/dmt, which is comparable to the P65 index average price for the period. In addition, index prices on sales contracts based on backward-looking pricing were also comparable to the P65 index average price during the period. During the quarter, the Company continued to prepare for the transition to a higher-purity DRPF product and intentionally reduced volumes sold under long-term sales contracts to retain a greater proportion of its available iron ore products for the short-term and spot markets, which have recently experienced greater pricing volatility and discounts.
Negative provisional pricing adjustments on prior-quarter sales of $0.3 million were recorded during the three-month period ended March 31, 2026, representing an unfavourable impact of US$0.1/dmt for the 3.5 million dmt sold during the quarter. A final average selling price of US$117.2/dmt was established for the 2.5 million dmt of iron ore subject to pricing adjustments as at December 31, 2025, which were provisionally priced at US$117.4/dmt.
Freight and other costs totalled US$32.9/dmt during the three-month period ended March 31, 2026, representing an 18% increase compared to US$28.0/dmt in the same prior-year period, mainly driven by a 27% rise in the average C3 index. Freight costs recognized during the period partially reflect the recent increase in market rates driven by the escalation of the conflict in Iran. The rise in the C3 index observed in March 2026 should be reflected in the next quarter considering that Champion books vessels three to five weeks prior to the desired laycan period.
After taking into account sea freight and other costs of US$32.9/dmt and the negative provisional pricing adjustments of US$0.1/dmt, the Company obtained a net average realized selling price of US$87.5/dmt (C$120.0/dmt1) for its high-purity iron ore concentrate shipped during the three-month period ended March 31, 2026.
B. Cost of Sales and C1 Cash Cost
For the three-month period ended March 31, 2026, the cost of sales totalled $285.8 million with a C1 cash cost of $82.7/dmt1, compared to $279.6 million with a C1 cash cost of $80.0/dmt1 for the same period in 2025.
Despite a significant rise in fuel prices at the end of the quarter, attributable to the conflict in the Middle East, mining and processing costs totalled $60.0/dmt produced1 for the three-month period ended March 31, 2026, representing a 3% decrease, compared to $62.0/dmt produced1 in the same prior-year period, mainly resulting from an 8% increase in production volumes.
Land transportation and port handling costs include both fixed and variable components and are significantly influenced by the volume hauled from Fermont to the Port of Sept-Îles. Although shipment volumes were substantially lower than in the comparative period, overall costs remained broadly comparable. The decrease in volumes, driven by the train derailment and severe winter conditions, previously outlined, reduced volume-based rebates and resulted in lower absorption of fixed costs. Semi-annual contractual price indexation also contributed to higher land transportation and port handling costs during the quarter. Despite these factors, land transportation and port handling costs per tonne sold for the three-month period ended March 31, 2026, were $23.8/dmt sold1, consistent with the prior-year period, reflecting comparable sales volumes.
The C1 cash cost was also impacted by changes in the valuation of iron ore concentrate inventory, which incorporate mining and processing costs from the previous quarter, along with variations in production and sales volumes.
C. Net Income & EBITDA
For the three-month period ended March 31, 2026, the Company generated net income of $23.2 million (EPS of $0.04), compared to $39.1 million (EPS of $0.08) for the same prior-year period. These decreases were mainly attributable to a lower gross profit and an unrealized foreign exchange loss resulting from the revaluation of net monetary liabilities denominated in U.S. dollars, partially offset by the change in fair value of derivative assets and lower income and mining taxes.
For the three-month period ended March 31, 2026, the Company generated EBITDA of $114.3 million1, representing an EBITDA margin of 28%1, compared to $127.4 million1, representing an EBITDA margin of 30%1, for the same period in 2025. With comparable sales volumes, lower EBITDA and EBITDA margins were mainly driven by a stronger Canadian dollar compared to the same period last year, which negatively impacted net average realized selling price, and a higher cash cost, partially offset by an increase in the fair value of derivative assets.
D. All-in Sustaining Cost & Cash Operating Margin
During the three-month period ended March 31, 2026, the Company realized an AISC of $96.9/dmt1, compared to $93.1/dmt1 for the same period in 2025. This increase was mainly due to higher cash cost and general and administrative expenses, while sustaining capital expenditures were mostly in line with the comparative period.
The Company generated a cash operating margin of $23.1/dmt1 for each tonne of high-purity iron ore concentrate sold during the three-month period ended March 31, 2026, compared to $28.6/dmt1 for the same prior-year period. This decrease was mainly due to a higher AISC for the period.
4. Conference Call and Webcast Information
A webcast and conference call to discuss the foregoing results will be held on May 28, 2026, at 9:00 AM (Montréal time) / 11:00 PM (Sydney time). Listeners may access a live webcast of the conference call from the Investors section of the Company's website at www.championiron.com/investors/events-presentations or by dialing toll free +1-888-699-1199 within North America or +61-2-8017-1385 from Australia.
An online archive of the webcast will be available by accessing the Company's website at www.championiron.com/investors/events-presentations . A telephone replay will be available for one week after the call by dialing +1-888-660-6345 within North America or +1-289-819-1450 overseas, and entering passcode 43604#.
About Champion Iron Limited
Champion is a high-purity iron ore producer with operations in Canada and Norway. Through Quebec Iron Ore Inc., Champion owns and operates the Bloom Lake Mining Complex located on the south end of the Labrador Trough, approximately 13 kilometres north of Fermont, Québec. Bloom Lake is an open-pit operation with two concentration plants that primarily source energy from renewable hydroelectric power, having a combined nameplate capacity of 15M wmt per year that produce low contaminant high-purity 66.2% Fe iron ore concentrate with a proven ability to produce a 67.5% Fe direct reduction quality iron ore concentrate. The iron ore concentrate from Bloom Lake is transported by rail, to a ship loading port in Sept-Îles, Québec. Benefiting from one of the highest purity resources globally, Champion is investing to be able to upgrade up to half of the Bloom Lake's mine capacity to a direct reduction quality pellet feed iron ore with up to 69% Fe. Bloom Lake's high-purity and lower contaminant iron ore products have attracted a premium to the P61 index (formerly, the P62 index).
Since April 10, 2026, Champion also owns and operates Rana Gruber, a Norwegian iron ore producer based in Mo i Rana, Nordland. With continuous production dating back to the 1960's, Rana Gruber produces approximately 1.8M dmt per year of hematite and magnetite iron ore concentrates.
Champion has delivered iron ore concentrates to global markets, including China, Japan, the Middle East, Europe, South Korea, India and Canada. In addition to its producing mines, Champion holds a 51% interest in the Kami Partnership, jointly owned with Nippon Steel and Sojitz, which owns the Kami Project. The Kami Project is located near available infrastructure, only 21 kilometres southeast of Bloom Lake. Champion also holds a portfolio of exploration and development projects in the Labrador Trough, including the Cluster II properties, situated within 60 kilometres south of Bloom Lake.
Cautionary Note Regarding Forward-Looking Statements
This press release contains certain information and statements that may constitute "forward-looking information" under applicable securities legislation ("Forward-Looking Statements"). Forward-Looking Statements are statements that are not historical facts and are generally, but not always, identified by the use of words such as "will", "plans", "expects", "is expected", "budget", "scheduled", "estimates", "continues", "forecasts", "projects", "predicts", "intends", "anticipates", "aims", "targets" or "believes", or variations of, or the negatives of, such words and phrases or state that certain actions, events or results "may", "could", "would", "should", "might" or "will" be taken, occur or be achieved. Inherent in Forward-Looking Statements are risks, uncertainties and other factors beyond the Company's ability to predict or control.
Specific Forward-Looking Statements
All statements, other than statements of historical facts, included in this press release that address future events, developments or performance that Champion expects to occur are Forward-Looking Statements. Forward-Looking Statements may include, among other things, Management's expectations regarding: (i) Bloom Lake's LoM, recovery rates and efforts to improve such rates, production, economic and other benefits, nameplate capacity and related opportunities and benefits; (ii) the project to upgrade the Bloom Lake iron ore concentrate to a higher purity and to convert approximately half of Bloom Lake's increased mine capacity to a DR quality pellet feed iron ore (the DRPF project), expected DRPF project timeline, including the anticipated timeline for initial saleable production and full production capacity, production metrics, and the timing thereof; (iii) the evaluation of strategies to optimize capital returns; (iv) the Kami Project Study and expected timeline for completion; (v) the Dividend Policy (as defined above) and the Company's capital return strategy generally and related policies, expected results and alternative strategies; (vi) the shift in steel industry production methods, expected rising demand for higher-purity iron ore products and DRI globally and related market deficit and higher premiums, and the Company's participation therein, contribution thereto and positioning in connection therewith, including the transition of the Company's product offering (including producing high-purity DRPF products) and the expansion of its geography, markets and customer base, related investments and expected benefits thereof; (vii) maintaining stripping activities cadence; (viii) ore inventory management strategies to maintain adequate levels of stockpiled iron ore saleable products; (ix) the relationship between iron ore prices and ocean freight costs (including C3 index outlook) and their impact on the Company; (x) the Company's beliefs regarding non-IFRS and other financial measures, including usefulness of those measures for investors to understand the Company's results and ability to generate operating earnings, compare operating results between periods, evaluate business performance, assess liquidity and cash flows to fund working capital needs and capital expenditures, and service debt obligations; (xi) the Company's beliefs regarding compliance with applicable laws and regulations, including that it has all necessary licenses, permits and approvals required to carry out its activities; and (xii) the Company's strategic and growth initiatives and opportunities generally, their potential to optimize shareholder returns, and the timeline for communication thereof.
Risks
Although the Company believes the expectations expressed in such Forward-Looking Statements are based on reasonable assumptions, such Forward-Looking Statements involve known and unknown risks, uncertainties and other factors, most of which are beyond the control of the Company, which may cause the Company's actual results, performance or achievements to differ materially from those expressed or implied by such Forward-Looking Statements. Factors that could cause actual results to differ materially from those expressed in Forward-Looking Statements include, without limitation: (i) iron ore prices; (ii) energy prices; (iii) operating costs; (iv) freight costs; (v) general economic, competitive, political and social uncertainties; (vi) continued availability of capital and financing and general economic, market or business conditions; (vii) timing of and uncertainty regarding the steel industry shift in production methods, impacting demand for high-purity feed; (viii) failure of plant, equipment or processes, including those of third party providers or counterparties, to operate as anticipated; (ix) delays in obtaining governmental approvals, necessary permitting or in the completion of development or construction activities; (x) the results of feasibility studies; (xi) changes in the assumptions used to prepare feasibility studies; (xii) project delays; (xiii) geopolitical events; and (xiv) the effects of catastrophes and public health crises on the global economy, the iron ore market and Champion's operations, as well as those factors discussed in the section entitled "Risk Factors" of the Company's Management's Discussion and Analysis for the financial year ended March 31, 2026 available under the Company's profile on the ASX at www.asx.com.au , SEDAR+ at www.sedarplus.ca and the Company's website at www.championiron.com .
There can be no assurance that any such Forward-Looking Statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such Forward-Looking Statements. Accordingly, readers should not place undue reliance on Forward-Looking Statements.
Additional Updates
All of the Forward-Looking Statements contained in this press release are given as of the date hereof or such other date or dates specified in the Forward-Looking Statements and are based upon the judgment and estimates of Champion's Management and information available to Management as at the date hereof. Champion disclaims any intention or obligation to update or revise any of the Forward-Looking Statements, whether as a result of new information, future events or otherwise, except as required by law. If the Company does update one or more Forward-Looking Statements, no inference should be drawn that it will make additional updates with respect to those or other Forward-Looking Statements. Champion cautions that the foregoing list of risks and uncertainties is not exhaustive. Readers should carefully consider the above factors as well as the uncertainties they represent and the risks they entail.
Abbreviations
Unless otherwise specified, all dollar figures stated herein are expressed in Canadian dollars. The following abbreviations are used throughout this release: US$ (United States dollar), Board (Board of Directors), Fe (iron ore), wmt (wet metric tonnes), dmt (dry metric tonnes), M (million), km (kilometers), LoM (life of mine), Bloom Lake or Bloom Lake Mine (Bloom Lake Mining Complex), DR (Direct Reduction), DRPF (Direct Reduction Pellet Feed), Kami Project (Kamistiatusset project), C3 index (C3 Baltic Capesize index), P61 index (Platts IODEX 61% Fe CFR China index), P62 index (Platts IODEX 62% Fe CFR China index), P65 index (Platts IODEX 65% Fe CFR China index), EBITDA (earnings before income and mining taxes, net finance costs and depreciation) and EPS (earnings per share). The utilization of "Champion" or the "Company" refers to Champion Iron Limited and/or one, or more, or all of its subsidiaries, as applicable. The term "IFRS" refers to International Financial Reporting Standards as issued by the International Accounting Standards Board.
For additional information on Champion Iron Limited, please visit our website at: www.championiron.com .
This document has been authorized for release to the market by the Board of Directors.
The Company's audited Consolidated Financial Statements and associated Management's Discussion and Analysis for the year ended March 31, 2026, are under the Company's profile on the ASX (www.asx.com.au ), SEDAR+ (www.sedarplus.ca ) and the Company's website (www.championiron.com ) on May 28, 2026.
| ____________________________________ | |
| 1 | |
| 2 |
Non-IFRS and Other Financial Measures
The Company has included certain non-IFRS financial measures, ratios and supplementary financial measures in this press release to provide investors with additional information in order to help them evaluate the underlying performance of the Company. These measures are mainly derived from the Financial Statements but do not have any standardized meaning prescribed by IFRS and, therefore, may not be comparable to similar measures presented by other companies. Management believes that these measures, in addition to conventional measures prepared in accordance with IFRS, provide investors with an improved ability to understand the results of the Company's operations. Non-IFRS and other financial measures should not be considered in isolation or as substitutes for measures of performance prepared in accordance with IFRS. The exclusion of certain items from non-IFRS financial measures does not imply that these items are necessarily non-recurring.
The Company presents certain of its non-IFRS measures and other financial measures in United States dollars in addition to Canadian dollars to facilitate comparability with measures presented by other companies.
EBITDA and EBITDA Margin
| (in thousands of dollars) | Q4 FY26 | Q3 FY26 | Q4 FY25 | |
| Income before income and mining taxes | 51,078 | 105,456 | 74,646 | |
| Net finance costs | 19,733 | 2,101 | 11,286 | |
| Depreciation | 43,529 | 44,851 | 41,446 | |
| EBITDA | 114,340 | 152,408 | 127,378 | |
| Revenues | 414,505 | 472,309 | 425,345 | |
| EBITDA margin | 28 % | 32 % | 30 % |
Available Liquidity
| As at March 31, | As at December 31, | |||
| (in thousands of dollars) | 2026 | 2025 | ||
| Cash and cash equivalents | 296,788 | 245,092 | ||
| Undrawn amounts under credit facilities | 515,600 | 506,340 | ||
| Available liquidity | 812,388 | 751,432 |
C1 Cash Cost
| Q4 FY26 | Q3 FY26 | Q4 FY25 | ||
| Iron ore concentrate sold (dmt) | 3,455,400 | 3,895,300 | 3,495,300 | |
| (in thousands of dollars, except per dmt data) | ||||
| Cost of sales | 285,785 | 287,712 | 279,644 | |
| C1 cash cost (per dmt sold) | 82.7 | 73.9 | 80.0 |
All-in Sustaining Cost
| Q4 FY26 | Q3 FY26 | Q4 FY25 | ||
| Iron ore concentrate sold (dmt) | 3,455,400 | 3,895,300 | 3,495,300 | |
| (in thousands of dollars, except per dmt data) | ||||
| Cost of sales | 285,785 | 287,712 | 279,644 | |
| Sustaining capital expenditures | 31,162 | 46,956 | 33,230 | |
| General and administrative expenses | 17,836 | 14,744 | 12,457 | |
| 334,783 | 349,412 | 325,331 | ||
| AISC (per dmt sold) | 96.9 | 89.7 | 93.1 |
Cash Operating Margin and Cash Profit Margin
| Q4 FY26 | Q3 FY26 | Q4 FY25 | ||
| Iron ore concentrate sold (dmt) | 3,455,400 | 3,895,300 | 3,495,300 | |
| (in thousands of dollars, except per dmt data) | ||||
| Revenues | 414,505 | 472,309 | 425,345 | |
| Net average realized selling price (per dmt sold) | 120.0 | 121.3 | 121.7 | |
| AISC (per dmt sold) | 96.9 | 89.7 | 93.1 | |
| Cash operating margin (per dmt sold) | 23.1 | 31.6 | 28.6 | |
| Cash profit margin | 19 % | 26 % | 24 % |
Gross Average Realized Selling Price per dmt Sold
| Q4 FY26 | Q3 FY26 | Q4 FY25 | |
| Iron ore concentrate sold (dmt) | 3,455,400 | 3,895,300 | 3,495,300 |
| (in thousands of dollars, except per dmt data) | |||
| Revenues | 414,505 | 472,309 | 425,345 |
| Provisional pricing adjustments | 299 | (4,373) | (5,389) |
| Freight and other costs | 155,844 | 166,539 | 140,627 |
| Gross revenues | 570,648 | 634,475 | 560,583 |
| Gross average realized selling price (per dmt sold) | 165.1 | 162.9 | 160.4 |
SOURCE Champion Iron Limited

Nouvelles
Consultez notre infolettre (PDF) »
CHAMPION IRON ANNONCE LA DIFFUSION DE SES RÉSULTATS DU QUATRIÈME TRIMESTRE ET DE L'EXERCICE FINANCIER 2026 ET DÉVOILE LES DÉTAILS D'UN APPEL CONFÉRENCE ET UNE WEBDIFFUSION
MONTRÉAL, le 13 mai 2026 /CNW/ - SYDNEY, le 14 mai 2026 - Champion Iron Limited (ASX : CIA) (TSX : CIA) (OTCQX : CIAFF) (« Champion » ou la « Société ») annonce qu'elle tiendra un appel conférence et une webdiffusion le 28 mai 2026 à 9 h 00 (heure de Montréal) / 28 mai 2026 à 23 h 00 (heure de Sydney) au cours desquels les membres de sa haute direction discuteront des résultats opérationnels et financiers du quatrième trimestre et de l'exercice financier terminés le 31 mars 2026.
Les états financiers et le rapport de gestion de Champion du quatrième trimestre et de l'exercice financier terminés le 31 mars 2026 seront publiés avant l'appel conférence et la webdiffusion. Ceux-ci seront disponibles sur le site Internet de la Société dans la section « Rapports Réglementaires & Financiers » à l'adresse www.championiron.com , et sous le profil de la Société sur l'ASX à l'adresse www.asx.com.au et sur SEDAR+ à l'adresse www.sedarplus.ca .
Une retransmission audio de la conférence sera disponible pour une période de 90 jours sur le site Internet de Champion à l'adresse www.championiron.com/investisseurs/evenements-presentations .
Accès à la conférence téléphonique :
| Tel. local & outremer : | (+1) 416 945 7677 |
| Tel. Amérique du Nord : | (+1) 888 699 1199 |
| Tel. Australie : | (+61) 2 8017 1385 |
| Webdiffusion: | www.championiron.com/investisseurs |
| Retransmission Outremer : | (+1) 289 819 1450 |
| Retransmission Amérique du Nord : | (+1) 888 660 6345 |
| Numéro d'accès : | 43604 # |
| Expiration : | Jeudi le 4 juin 2026 à 23 h 59 (heure de Montréal) / Vendredi le 5 juin 2026 à 13 h 59 (heure de Sydney) |
**À propos de Champion Iron Limited
**Champion est un producteur de minerai de fer de haute pureté, avec des activités au Canada et en Norvège. Par l'entremise de sa filiale en propriété exclusive Minerai de fer Québec inc., Champion détient et exploite le complexe minier du Lac Bloom situé à l'extrémité sud de la Fosse du Labrador, à environ 13 kilomètres au nord de Fermont, Québec. La mine du Lac Bloom est une mine à ciel ouvert avec deux usines de concentration qui s'alimentent principalement en énergie hydroélectrique renouvelable, ayant une capacité nominale combinée de 15 millions de tonnes métriques humides par année. Les deux usines de concentration produisent du concentré de minerai de fer de haute pureté (66,2 % Fe) avec de faibles teneurs en contaminants et ont prouvé leur capacité à produire un concentré de qualité supérieure destiné à la réduction directe (67,5 % Fe). Champion expédie son concentré de minerai de fer du Lac Bloom par rail jusqu'au port de chargement situé à Sept-Îles, Québec. Bénéficiant de l'une des ressources les plus pures au monde, Champion investit pour être en mesure de convertir jusqu'à la moitié de la capacité de la mine du Lac Bloom afin de produire du matériel de qualité réduction directe pour boulettes pouvant atteindre 69 % Fe. Les produits de minerai de fer de haute pureté et à plus faible teneur en contaminants du Lac Bloom ont su se mériter une prime par rapport à l'indice P61.
Champion détient et exploite également Rana Gruber ASA, un producteur norvégien de minerai de fer établi à Mo i Rana, Nordland. Avec une production continue depuis les années 1960, Rana Gruber produit environ 1,8 million de tonnes métriques sèches par année de concentré de minerai de fer, d'hématite et de magnétite.
À partir de ses deux sites d'exploitation, Champion a livré ses concentrés de minerai de fer à l'échelle mondiale, notamment en Chine, au Japon, au Moyen-Orient, en Europe, en Corée du Sud, en Inde et au Canada. En plus de ses mines en production, Champion détient une participation de 51 % dans Kami Iron Mine Partnership, en partenariat avec Nippon Steel Corporation et Sojitz Corporation. Le projet est situé à proximité d'infrastructures existantes, à seulement 21 kilomètres au sud-est du Lac Bloom. Champion détient également un portefeuille de projets d'exploration et de développement dans la Fosse du Labrador, incluant les propriétés Cluster II, situées à moins de 60 kilomètres au sud du Lac Bloom.
Pour plus de renseignements sur Champion Iron Limited, veuillez visiter notre site Web à l'adresse : www.championiron.com .
La diffusion du présent communiqué a été autorisée par David Cataford, chef de la direction de Champion Iron Limited.
SOURCE Champion Iron Limited

Pour plus de renseignements: Pour plus de renseignements, veuillez contacter : Champion Iron Limited, Michael Marcotte, CFA, Vice-président sénior au développement corporatif et aux marchés des capitaux, 514-316-4858, poste 1128, [email protected]
[Champion Iron s'engage dans des projets performants,
à faible impact environnemental.
---------------------------------------------------------------------------------------
\
Investissez dans l'avenir brillant des mines\
‘Voir notre plus récent rapport d'activité»
](https://www.championiron.com/investisseurs/telecharger-le-guide-de-linvestisseur/?lang=fr)
Inscrivez-vous à l’infolettre Champion Iron
Voir tous les prix du marché »
Voir tous les prix du marché »
Siège social
Montréal
1155 René-Lévesque West
Suite 3300
Montréal QC H3B 3X7
Tél.: +1 514 316 4858
Téléc.: +1 514 871 8270
Australie
91, Evans Street
Rozelle NSW 2039
Tél.: +61 2 98107816
Téléc.: +61 2 86555017
Toronto
20, Adelaide Street East
Suite 200
Toronto ON M5C 2T6
Tél.: +1 416 866-2200
Sans frais (Amérique du Nord) :
+1 877 448-2201
Téléc.: +1 416 361-1333
×
(opens in a new window)
Press Releases
Consult our newsletters (PDF) »
CHAMPION IRON PROVIDES NOTICE OF FOURTH QUARTER AND FINANCIAL YEAR 2026 RESULTS WITH CONFERENCE CALL WEBCAST DETAILS
MONTRÉAL, May 13, 2026 /CNW/ - SYDNEY, May 14, 2026 - Champion Iron Limited (ASX: CIA) (TSX: CIA) (OTCQX: CIAFF) ("Champion" or the "Company") announces that it will be hosting a conference call and webcast on May 28, 2026, at 9:00 AM (Montréal time) / May 28, 2026 at 11:00 PM (Sydney time) with its senior management, during which they will review the Company's 2026 fourth quarter and financial year operational and financial results.
Champion's financial statements and management's discussion and analysis for the fourth quarter and financial year ended March 31, 2026, will be released prior to the conference call and webcast, and will be available in the "Financial & Regulatory Reports" section of the Company's website at www.championiron.com , under the Company's profile on the ASX at www.asx.com.au and on SEDAR+ at www.sedarplus.ca .
A live audio webcast of the conference call will be accessible for a period of 90 days through Champion's website at www.championiron.com/investors/events-presentations .
Access to the Conference Call:
| Tel. local & overseas: | (+1) 416 945 7677 |
| Tel. North America: | (+1) 888 699 1199 |
| Tel. Australia: | (+61) 2 8017 1385 |
| Webcast: | www.championiron.com/investors |
| Replay overseas: | (+1) 289 819 1450 |
| Replay N. America: | (+1) 888 660 6345 |
| Replay passcode: | 43604 # |
| Replay expiration: | Thursday, June 4, 2026, at 11:59 PM (Montréal time) / Friday, June 5, 2026, at 1:59 PM (Sydney time) |
**About Champion Iron Limited
**Champion is a high-purity iron ore producer with operations in Canada and Norway. Through its wholly-owned subsidiary Quebec Iron Ore Inc., Champion owns and operates the Bloom Lake Mining Complex located on the south end of the Labrador Trough, approximately 13 kilometres north of Fermont, Québec. Bloom Lake is an open-pit operation with two concentration plants that primarily source energy from renewable hydroelectric power, having a combined nameplate capacity of 15M wet metric tonnes per year that produce low contaminant high-grade 66.2% Fe iron ore concentrate with a proven ability to produce a 67.5% Fe direct reduction quality iron ore concentrate. Champion transports its iron ore concentrate from Bloom Lake by rail, to a ship loading port in Sept-Îles, Québec. Benefiting from one of the highest purity resources globally, Champion is investing to be able to upgrade up to half of the Bloom Lake's mine capacity to a direct reduction quality pellet feed iron ore with up to 69% Fe. Bloom Lake's high-grade and lower contaminant iron ore products have attracted a premium to the P61 index (formerly the P62 index).
Champion also owns and operates Rana Gruber ASA, a Norwegian iron ore producer based in Mo i Rana, Nordland. With continuous production dating back to the 1960's, Rana Gruber produces approximately 1.8M dry metric tonnes per year of hematite and magnetite iron ore concentrates.
From its two operating mines, Champion has delivered iron ore concentrates to global markets, including China, Japan, the Middle East, Europe, South Korea, India and Canada. In addition to its producing mines, Champion holds a 51% interest in Kami Iron Mine Partnership, jointly owned with Nippon Steel Corporation and Sojitz Corporation, which owns the Kami Project. The Kami Project is located near available infrastructure, only 21 kilometres southeast of Bloom Lake. Champion also holds a portfolio of exploration and development projects in the Labrador Trough, including the Cluster II properties, situated within 60 kilometres south of Bloom Lake.
For additional information on Champion Iron Limited, please visit our website at: www.championiron.com .
This press release has been authorized for release to the market by the CEO of Champion Iron Limited, David Cataford.
SOURCE Champion Iron Limited

Nouvelles
Consultez notre infolettre (PDF) »
CHAMPION IRON ANNONCE SA PRODUCTION ET SES VENTES POUR LE QUATRIÈME TRIMESTRE DE L'EXERCICE FINANCIER 2026
-
Production trimestrielle de 3,4 Mtmh, ventes de 3,5 Mtms et coût comptant d'environ 82,7 $/tms1
-
La mise en service du projet RDPB progresse comme prévu; les premiers essais de production ont été complétés avec succès en mars 2026 et la production d'un produit pour vente commerciale est prévue d'ici la fin du deuxième trimestre de l'année civile 2026
-
L'acquisition annoncée antérieurement de Rana Gruber, un producteur norvégien de minerai de fer de haute pureté de premier plan, a été clôturée en avril 2026
MONTRÉAL, le 29 avril 2026 /CNW/ - SYDNEY, le 30 avril 2026 - Champion Iron Limited (ASX : CIA) (TSX : CIA) (OTCQX : CIAFF) (« Champion » ou la « Société ») annonce ses résultats de production et ses charges d'exploitation minière pour le quatrième trimestre financier terminé le 31 mars 2026. Les résultats financiers annuels audités et les résultats opérationnels détaillés seront publiés avant la tenue par la Société d'une conférence téléphonique et d'une webdiffusion le 28 mai 2026.
Le chef de la direction de Champion, M. David Cataford, a déclaré : « Notre équipe continue de mettre l'accent sur l'efficacité et l'exécution disciplinée, tout en menant à bien des initiatives qui ont pour but d'optimiser nos opérations, renforcer nos performances commerciales et faire avancer nos projets de croissance. Parallèlement, notre projet RDPB progresse comme prévu et la production d'un premier produit pour vente commerciale est attendue au deuxième trimestre de l'année civile. Par ailleurs, la récente clôture de la transaction visant Rana Gruber ASA (« Rana Gruber ») marque une étape importante pour Champion. Elle renforce notre leadership en tant que producteur de minerai de fer de haute pureté à faible empreinte carbone tout en augmentant nos flux de trésorerie, ce qui nous permettra de tirer parti d'occasions pour maximiser la valeur à long terme pour nos actionnaires et pour les communautés où nous exerçons nos activités. »
Détails relatifs à la conférence téléphonique
Champion tiendra une conférence téléphonique et une webdiffusion le 28 mai 2026 à 9 h 00 (heure de Montréal) / 23 h 00 (heure de Sydney) pour discuter des résultats du quatrième trimestre et de l'exercice financier terminés le 31 mars 2026. Les détails relatifs à la conférence téléphonique sont fournis à la fin du présent communiqué de presse.
1. Faits saillants du trimestre
Opérations et développement durable
- Aucun accident de travail sérieux ni incident environnemental majeur n'a été signalé durant le trimestre terminé le 31 mars 2026;
- Production trimestrielle de 3,4 Mtmh de concentré à haute pureté (66,2 % Fe) pour le trimestre terminé le 31 mars 2026, en progression de 8 % comparativement à la même période de l'année précédente, et comparable à la production du deuxième trimestre de l'exercice financier 2026, au cours duquel la Société avait aussi procédé à l'entretien semestriel planifié des deux usines de concentration;
- Ventes trimestrielles de 3,5 Mtms pour le trimestre terminé le 31 mars 2026, comparable à la même période de l'année précédente, malgré une interruption des services ferroviaires provoquée par le déraillement d'un train exploité par un tiers qui a pris fin le 4 janvier 2026, suivie de perturbations persistantes des services, jusqu'à ce que les activités de l'opérateur du chemin de fer reviennent à la normale, ainsi que des conditions hivernales particulièrement difficiles;
- Les stocks de concentré de minerai de fer accumulés au Lac Bloom et au port ont diminué pour s'établir à 1,3 Mtmh au 31 mars 2026 comparativement à 1,5 Mtmh au 31 décembre 2025; et
- Solide performance minière au Lac Bloom, avec 20,9 Mtmh de matériel extrait et transporté durant le trimestre terminé le 31 mars 2026, en hausse de 3 % comparativement à la même période de l'année précédente, grâce à l'utilisation accrue et améliorée des équipements de chargement et de forage et à la disponibilité des camions de halage.
Résultats financiers
- Coût comptant C1 pour le concentré de minerai de fer chargé sur les navires au port de Sept-Îles totalisant environ 82,7 $/tms1 (60 $ US/tms), en hausse de 12 % d'un trimestre à l'autre, en raison principalement de l'entretien semestriel planifié des deux usines de concentration, et en hausse de 3 % d'une année à l'autre. Le coût comptant C1 pour le trimestre terminé le 31 mars 2026 a été impacté par les coûts de transport terrestre et de manutention portuaire plus élevés en raison des volumes inférieurs transportés jusqu'aux installations portuaires, compte tenu du déraillement de train et des conditions hivernales sévères, ainsi que par la hausse substantielle des prix pour le carburant à la fin du trimestre découlant du conflit au Moyen-Orient;
- Le solde de trésorerie, en excluant la portion inutilisée des contributions en espèces initiales de Nippon Steel Corporation (« Nippon Steel ») et Sojitz Corporation (« Sojitz », et collectivement avec Nippon Steel, les « partenaires ») détenues dans un compte de trésorerie affectée par Kami Iron Mine Partnership (le « partenariat Kami »), totalisait 296,8 M$ au 31 mars 2026, en hausse de 51,7 M$ depuis le 31 décembre 2025, reflétant les robustes flux de trésorerie nets générés par les activités d'exploitation, alors que la Société a continué de faire avancer son projet RDPB et d'investir dans des projets d'investissement durables; et
- Solides liquidités disponibles pour soutenir les initiatives de croissance et les besoins généraux de l'entreprise totalisant 812,4 M$1 au 31 mars 2026, comparativement à 751,4 M$1 au 31 décembre 2025.
Mise à jour sur le projet RDPB
- Le projet RDPB, qui vise à convertir jusqu'à la moitié de la capacité du Lac Bloom pour produire du minerai de fer de qualité RD pour bouletage d'une teneur allant jusqu'à 69 % Fe, a progressé comme prévu. Le début de la production pour vente commerciale est anticipé d'ici la fin du deuxième trimestre de l'année civile 2026 avec une augmentation graduelle des volumes de production par la suite;
- Les activités de mise en service ont progressé parallèlement aux travaux de construction, avec un renforcement des vérifications pré-opérationnelles et la mise en service à l'eau, ce qui a permis de compléter avec succès les premiers essais de production en mars 2026; et
- Les investissements trimestriels et cumulatifs s'élevaient à environ 39 M$ et 480 M$, respectivement, au 31 mars 2026, comparativement à un investissement cumulatif estimé à 500 M$.
Projets en développement et autres initiatives de croissance
- Le 10 avril 2026, la Société a conclu l'acquisition de Rana Gruber, conformément aux modalités de son offre publique de rachat volontaire en espèces, recommandée et annoncée antérieurement. 92,48 % des actions émises et en circulation de Rana Gruber ont été déposées dans le cadre de l'offre de rachat. La Société a par la suite procédé à l'acquisition obligatoire des actions restantes et est devenue propriétaire de 100 % des actions de Rana Gruber le 17 avril 2026. La transaction a été finalisée à un prix d'acquisition total d'environ 300 millions de dollars américains, frais et dépenses connexes en sus (l'« acquisition »), et a été financée grâce à une combinaison d'une nouvelle facilité de prêt à terme garanti d'un montant de 150 millions de dollars américains de quatre ans (le « prêt à terme »), du produit net d'un placement privé d'actions de 100 millions de dollars américains réalisé avec la Caisse de dépôt et placement du Québec, et des liquidités disponibles. De plus amples détails concernant l'acquisition sont disponibles dans le communiqué de presse de la Société daté du 10 avril 2026 (Montréal), disponible sous son profil auprès de l'ASX à l'adresse www.asx.com.au , sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à l'adresse www.championiron.com ;
- En lien avec l'acquisition, Champion et certaines de ses filiales ont refinancé les facilités de crédit de premier rang consortiales de la Société en date du 1er avril 2026 afin, entre autres choses, de reporter l'échéance jusqu'en avril 2030, d'établir le prêt à terme et d'apporter des modifications à la facilité de crédit renouvelable garantie de premier rang de 400 millions de dollars américains, notamment pour tenir compte de l'acquisition;
- Le partenariat Kami a reçu une contribution financière de Ressources naturelles Canada, dans le cadre du Fonds du premier et du dernier kilomètre (anciennement Fonds pour l'infrastructure des minéraux critiques), afin de faire progresser l'étude de faisabilité afférente aux principales infrastructures énergétiques et de transport du projet Kami; et
- Poursuite des travaux dans le cadre de l'étude de faisabilité définitive (« EFD ») du projet Kami, laquelle devrait être complétée au deuxième semestre de l'année civile 2026.
2. Activités d'exploitation à la mine du Lac Bloom
La Société effectue l'entretien planifié de ses deux usines en tandem, aux deuxième et quatrième trimestres financiers, ce qui peut générer des variations marquées d'un trimestre à l'autre au niveau de la production et des coûts d'extraction minière et de traitement.
| T4 Exercice 2026 | T3 Exercice 2026 | Variation trimestrielle | T4 Exercice 2025 | Variation annuelle | |
| Données d'exploitation | |||||
| Stérile extrait et transporté (tmh) | 10 979 800 | 12 088 600 | (9 %) | 10 886 200 | 1 % |
| Minerai extrait et transporté (tmh) | 9 915 100 | 10 549 700 | (6 %) | 9 470 100 | 5 % |
| Matériel extrait et transporté (tmh) | 20 894 900 | 22 638 300 | (8 %) | 20 356 300 | 3 % |
| Ratio de déblaiement | 1,11 | 1,15 | (3 %) | 1,15 | (3 %) |
| Minerai broyé (tmh) | 9 744 200 | 10 443 200 | (7 %) | 9 160 300 | 6 % |
| Teneur d'alimentation (% Fe) | 28,8 | 29,1 | (1 %) | 29,2 | (1 %) |
| Récupération du Fe (%) | 80,6 | 79,7 | 1 % | 78,3 | 3 % |
| Teneur du produit (% Fe) | 66,2 | 66,5 | -- % | 66,5 | -- % |
| Concentré de minerai de fer produit (tmh) | 3 435 100 | 3 661 400 | (6 %) | 3 167 000 | 8 % |
| Concentré de minerai de fer vendu (tms) | 3 455 400 | 3 895 300 | (11 %) | 3 495 300 | (1 %) |
Le Lac Bloom a produit 3,4 Mtmh de concentré de minerai de fer à haute pureté (66,2 % Fe) au cours du trimestre terminé le 31 mars 2026, une progression de 8 % comparativement à la même période en 2025, principalement attribuable à la productivité et à la récupération du fer plus élevées, partiellement contrebalancée par une teneur d'alimentation plus basse. Durant le trimestre terminé le 31 mars 2026, le taux de récupération du fer a grimpé à 80,6 % par rapport à 78,3 % lors de la même période en 2025, bénéficiant du rendement accru des systèmes gravimétriques, grâce à l'application de programmes de travaux et l'optimisation des opérations. Tout en sachant que les taux de récupération du fer peuvent fluctuer en fonction du plan minier et de ses variations dans la teneur d'alimentation, la Société poursuivra ses efforts pour améliorer et stabiliser ses taux de récupération du fer au fil du temps.
Le volume des ventes de concentré de minerai de fer durant le trimestre terminé le 31 mars 2026 était comparable à la même période de l'année précédente, et a surpassé la production pour le cinquième trimestre consécutif, alors que la Société a continué de réduire ses stocks de concentré de minerai de fer accumulés au Lac Bloom et au port de Sept-Îles. Les volumes vendus ont été défavorablement affectés par le déraillement d'un train exploité par un tiers qui a mené à une interruption des services ferroviaires au début de la période, suivie de perturbations qui ont persisté sur une grande partie du trimestre. Conséquemment, le cumul des stocks de concentré de minerai de fer au Lac Bloom et au port totalisait 1,3 Mtmh au 31 mars 2026, comparativement à 1,5 Mtmh au 31 décembre 2025. La Société évalue présentement des stratégies de gestion des stocks au site minier et au port en prévision des changements à venir au niveau de son offre de produits avec l'arrivée de minerai de fer de qualité RDPB, afin de maintenir ses stocks de concentré de minerai de fer à des niveaux adéquats pour gérer la logistique de production et de vente.
Durant le trimestre terminé le 31 mars 2026, la Société a extrait et transporté 20,9 Mtmh de stériles et de minerai, surpassant le volume de 20,4 Mtmh enregistré à la même période de l'année précédente. Cette solide performance minière reflète l'ajout d'équipements de chargement et la récente mise en service d'une nouvelle foreuse, ainsi que de meilleurs taux d'utilisation et de disponibilité des camions de halage. Le ratio de déblaiement pour le trimestre terminé le 31 mars 2026 s'est établi à 1,11, comparativement au ratio de 1,15 enregistré à la même période de l'année précédente. Champion prévoit maintenir les activités de déblaiement à des niveaux élevés lors des périodes à venir, conformément à son plan sur la durée de vie de la mine.
3. Coût des ventes et coût comptant C1
Pour le trimestre terminé le 31 mars 2026, le coût des ventes a totalisé environ 286 M$, avec un coût comptant C1 de 82,7 $/tms1, comparativement à 279,6 M$ avec un coût comptant C1 de 80,0 $/tms1 à la même période en 2025.
Bien que la Société ait réduit ses coûts d'extraction et de traitement du minerai au cours du trimestre, cette amélioration a été entièrement contrebalancée par une hausse des coûts de transport terrestre et de manutention portuaire, attribuable à des volumes transportés jusqu'au port de Sept-Îles nettement inférieurs à ceux de la période comparative, notamment en raison du déraillement de train susmentionné et des conditions hivernales sévères. Cette diminution des volumes de concentré de minerai de fer transportés a mené à une réduction des remises sur volumes et un moindre amortissement des coûts fixes des installations portuaires. L'indexation semestrielle des prix contractuels a aussi contribué à l'augmentation des coûts de transport terrestre et de manutention portuaire durant le trimestre. De plus, en mars 2026, le coût comptant C1 a commencé à subir l'impact défavorable d'une hausse marquée des prix pour le carburant découlant du conflit au Moyen-Orient et des contraintes d'approvisionnement associées.
4. Activités d'exploration
Durant le trimestre terminé le 31 mars 2026, la Société a maintenu toutes ses propriétés en règle et n'a conclu aucune entente d'option.
Durant le trimestre terminé le 31 mars 2026, des dépenses d'exploration et d'évaluation d'environ 1 M$ ont été engagées, comparativement à 11,0 M$ pour la même période de l'année précédente. La diminution des investissements d'une année à l'autre reflète le transfert des propriétés Kami au partenariat Kami et l'acquisition par les partenaires d'une participation globale de 49 % dans le partenariat Kami en septembre 2025.
Les dépenses d'exploration et d'évaluation étaient liées à des activités effectuées au Québec et à Terre-Neuve-et-Labrador. De plus amples détails sur les projets d'exploration, ainsi que des cartes, sont disponibles sur le site Web de la Société à l'adresse www.championiron.com à la section Opérations et Projets .
5. Informations relatives à la conférence téléphonique et à sa webdiffusion
Une webdiffusion et une conférence téléphonique au cours desquelles les résultats ci-dessus seront abordés plus en détail auront lieu le 28 mai 2026 à 9 h 00 (heure de Montréal) / 23 h 00 (heure de Sydney). Les auditeurs pourront suivre une webdiffusion en direct de la conférence téléphonique à la section Investisseurs du site Web de la Société à l'adresse www.championiron.com/investisseurs/evenements-presentations ou en composant sans frais le +1-888-699-1199 en Amérique du Nord ou le +61-2-8017-1385 en Australie.
La webdiffusion sera archivée en ligne à des fins de consultation et sera disponible sur le site Web de la Société à l'adresse www.championiron.com/investisseurs/evenements-presentations . Une rediffusion téléphonique sera également disponible dans la semaine suivant la conférence téléphonique, en composant le +1-888-660-6345 en Amérique du Nord ou le +1-289-819-1450 outremer, puis en composant le code d'accès 43604#.
À propos de Champion Iron Limited
Champion est un producteur de minerai de fer de haute pureté, avec des activités au Canada et en Norvège. Par l'entremise de sa filiale en propriété exclusive Minerai de fer Québec inc., Champion détient et exploite le complexe minier du Lac Bloom situé à l'extrémité sud de la Fosse du Labrador, à environ 13 kilomètres au nord de Fermont, Québec. La mine du Lac Bloom est une mine à ciel ouvert avec deux usines de concentration qui s'alimentent principalement en énergie hydroélectrique renouvelable, ayant une capacité nominale combinée de 15 millions de tonnes métriques humides par année. Les deux usines de concentration produisent du concentré de minerai de fer de haute pureté (66,2 % Fe) avec de faibles teneurs en contaminants et ont prouvé leur capacité à produire un concentré de qualité supérieure destiné à la réduction directe (67,5 % Fe). Champion expédie son concentré de minerai de fer du Lac Bloom par rail jusqu'au port de chargement situé à Sept-Îles, Québec. Bénéficiant de l'une des ressources les plus pures au monde, Champion investit pour être en mesure de convertir jusqu'à la moitié de la capacité de la mine du Lac Bloom afin de produire du matériel de qualité réduction directe pour boulettes pouvant atteindre 69 % Fe. Les produits de minerai de fer de haute pureté et à plus faible teneur en contaminants du Lac Bloom ont su se mériter une prime par rapport à l'indice P61.
Champion détient et exploite également Rana Gruber ASA, un producteur norvégien de minerai de fer établi à Mo i Rana, Nordland. Avec une production continue depuis les années 1960, Rana Gruber produit environ 1,8 million de tonnes métriques sèches par année de concentré de minerai de fer, d'hématite et de magnétite.
À partir de ses deux sites d'exploitation, Champion a livré ses concentrés de minerai de fer à l'échelle mondiale, notamment en Chine, au Japon, au Moyen-Orient, en Europe, en Corée du Sud, en Inde et au Canada. En plus de ses mines en production, Champion détient une participation de 51 % dans Kami Iron Mine Partnership, en partenariat avec Nippon Steel Corporation et Sojitz Corporation. Le projet est situé à proximité d'infrastructures existantes, à seulement 21 kilomètres au sud-est du Lac Bloom. Champion détient également un portefeuille de projets d'exploration et de développement dans la Fosse du Labrador, incluant les propriétés Cluster II, situées à moins de 60 kilomètres au sud du Lac Bloom.
Mise en garde à propos des énoncés prospectifs
Le présent communiqué de presse contient de l'information et des énoncés qui peuvent constituer de l'« information prospective » aux termes de la législation sur les valeurs mobilières applicable (des « énoncés prospectifs »). Les énoncés prospectifs sont des énoncés qui ne sont pas des faits historiques et qui sont généralement, mais pas toujours, identifiés par l'emploi de termes comme « sera », « planifie », « s'attend à », « budgète », « est prévu », « estime », « continue », « prévoit », « projette », « prédit », « a l'intention de », « anticipe », « vise », « cible » ou « est d'avis », ou toute variation de ces termes, y compris leurs négatifs, ou des énoncés à l'effet que certaines actions et certains événements ou résultats « peuvent », « doivent », « pourraient », « devraient », « pourront » ou « devront » survenir, se réaliser ou être entrepris. Les énoncés prospectifs comportent des risques inhérents, des incertitudes et d'autres facteurs qui ne peuvent être prédits ni contrôlés par la Société.
Énoncés prospectifs spécifiques
Tous les énoncés autres que les énoncés de faits historiques compris dans le présent communiqué de presse, qui concernent des événements futurs, des développements ou des réalisations que Champion s'attend à voir se réaliser, sont des énoncés prospectifs. Les énoncés prospectifs peuvent comprendre, entre autres choses, les attentes de la direction concernant : (i) la durée de vie de la mine du Lac Bloom, les taux de récupération du fer, la production, les retombées économiques et autres, et les occasions et avantages associés; (ii) le projet visant à valoriser le concentré de minerai de fer du Lac Bloom à une teneur plus élevée en fer et à convertir près de la moitié de la capacité nominale accrue de 15 Mtmh par année du Lac Bloom afin de produire commercialement du minerai de fer destiné à la réduction directe pour bouletage (le projet RDPB), l'échéancier de réalisation anticipé du projet RDPB, les dépenses d'investissement, le budget et le financement, les paramètres de production, les paramètres techniques, les prix plus avantageux, les gains d'efficacité, les retombées économiques et autres, les discussions connexes avec des clients potentiels et les attentes à l'égard de ces derniers, la date prévue de la mise en service, des expéditions commerciales de minerai de fer et de la montée en puissance du projet RDPB et leur impact sur la production, les ventes et les résultats financiers; (iii) le potentiel du projet Kami de produire un produit de qualité RD, la réalisation d'une EFD ainsi que sa date de réalisation; (iv) les attentes de la Société en lien avec l'acquisition de Rana Gruber récemment clôturée; (v) la stratégie de rendements pour les actionnaires de la Société; (vi) le changement des méthodes de production de l'industrie sidérurgique, la croissance prévue de la demande mondiale pour des produits de minerai de fer à plus haute pureté et de fer préréduit (DRI), ainsi que le déficit de marché et les primes plus élevées qui s'en suivent, et la participation de la Société à ces efforts, sa contribution aux résultats et son positionnement en lien avec ces éléments, incluant la transition de l'offre de produits de la Société (y compris la production de produits RDPB de haute pureté), son expansion géographique, l'élargissement de ses marchés et de sa clientèle, les investissements connexes ainsi que les avantages attendus; (vii) le maintien d'activités de déblaiement accrues; (viii) la quantité des stocks de minerai accumulés et les stratégies de gestion des stocks de minerai de la Société; (ix) les taux et les niveaux de production et de récupération du fer, les caractéristiques du minerai et la performance de la Société ainsi que les stratégies et les programmes de travaux connexes visant à optimiser les opérations; (x) les liquidités disponibles et la marge de manœuvre financière de la Société; et (xi) la croissance et les opportunités de la Société en général.
Risques
Bien que la Société croie que les attentes exprimées dans ces énoncés prospectifs sont basées sur des hypothèses raisonnables, de tels énoncés prospectifs sont sujets à des risques, incertitudes et autres facteurs connus et inconnus, dont la plupart sont hors du contrôle de la Société, ce qui peut faire en sorte de faire varier substantiellement les résultats, performances ou accomplissements réels de la Société par rapport à ceux qui sont exprimés ou sous-entendus dans ces énoncés prospectifs. Des facteurs susceptibles de causer de telles variations entre les résultats réels et ceux indiqués dans les énoncés prospectifs incluent, sans s'y limiter : (i) les prix futurs du minerai de fer; (ii) les futurs coûts de transport; (iii) les incertitudes générales économiques, concurrentielles, politiques et sociales; (iv) la disponibilité continue de capital et de financement ainsi que l'état général de l'économie, du marché et des affaires; (v) le moment et l'incertitude du passage de l'industrie sidérurgique aux fours à arc électrique, et l'impact sur la demande pour du matériel d'alimentation à haute pureté; (vi) des défaillances des usines, des équipements ou des processus à opérer comme prévu, y compris ceux des fournisseurs tiers ou des contreparties; (vii) des retards dans l'obtention d'approbations gouvernementales, des permis nécessaires ou dans l'achèvement d'activités de développement ou de construction; (viii) les résultats des études de faisabilité; (ix) les changements aux hypothèses utilisées dans le cadre des études de faisabilité; (x) les délais dans les projets; (xi) les événements géopolitiques; (xii) les effets de catastrophes et de crises de santé publique sur l'économie mondiale, le marché du minerai de fer et les opérations de Champion; (xiii) l'incapacité de la Société d'intégrer avec succès les activités, systèmes et opérations de Rana Gruber dans les délais anticipés et aux niveaux de coûts estimés et de maintenir en poste les membres clés de son personnel, et les éventuels coûts ou passifs non divulgués en lien avec l'acquisition de Rana Gruber, ainsi que les facteurs traités dans la section sur les facteurs de risque du rapport de gestion de la Société pour l'exercice financier terminé le 31 mars 2026 et pour le trimestre terminé le 31 mars 2026, disponibles sous le profil de la Société auprès de l'ASX à l'adresse www.asx.com.au
, sur SEDAR+ à l'adresse www.sedarplus.ca
et sur le site Web de la Société à l'adresse www.championiron.com
.
Rien ne garantit que l'un ou l'autre des énoncés prospectifs se révélera exact, les résultats réels et les événements futurs pouvant être sensiblement différents de ceux prévus dans les énoncés prospectifs. Les lecteurs ne doivent donc pas se fier outre mesure aux énoncés prospectifs.
Mises à jour ultérieures
Tous les énoncés prospectifs dans le présent communiqué de presse sont donnés en date des présentes ou à toute autre date spécifiée dans les énoncés prospectifs et sont fondés sur les jugements et les estimations de la direction de Champion et sur l'information dont la direction dispose à la date des présentes. Champion décline toute intention ou obligation de mettre à jour ou de réviser ses énoncés prospectifs, notamment à la lumière de nouveaux renseignements ou d'événements futurs, à moins que la législation ne l'y oblige. Si la Société publie une mise à jour de l'un ou de plusieurs des énoncés prospectifs, l'on ne doit pas supposer que d'autres mises à jour suivront à propos de ces énoncés prospectifs ou d'autres énoncés prospectifs. Champion met en garde le lecteur à l'effet que la liste de risques et d'incertitudes ci-dessus n'est pas exhaustive. Les lecteurs devraient considérer les facteurs ci-dessus avec attention, ainsi que les incertitudes qu'ils représentent et les risques qu'ils comportent.
Abréviations
Sauf indication contraire, tous les montants en dollars indiqués dans les présentes sont libellés en dollars canadiens. Les abréviations suivantes sont utilisées tout au long de ce communiqué de presse : $ US (dollar américain), Fe (minerai de fer), tmh (tonne métrique humide), tms (tonne métrique sèche), M (million), km (kilomètre), Lac Bloom ou mine du Lac Bloom (complexe minier du Lac Bloom), RD (réduction directe), RDPB (réduction directe pour bouletage), projet Kami (projet Kamistiatusset), indice P62 (indice Platts IODEX CFR Chine pour le minerai de fer à 62 % Fe) et P61 (indice Platts IODEX CFR Chine pour le minerai de fer à 61 % Fe). L'utilisation de « Champion » ou de la « Société » fait référence à Champion Iron Limited et/ou à l'une ou plusieurs ou toutes ses filiales, selon le cas, et « IFRS » fait référence aux Normes internationales d'information financière telles qu'émises par l'International Accounting Standards Board.
Pour plus de renseignements sur Champion Iron Limited, veuillez visiter notre site Web à l'adresse : www.championiron.com .
La diffusion du présent communiqué de presse a été autorisée par le conseil d'administration.
Les états financiers consolidés audités de la Société et le rapport de gestion connexe pour l'exercice terminé le 31 mars 2026 seront disponibles sous le profil de la Société auprès de l'ASX (www.asx.com.au ), sur SEDAR+ (www.sedarplus.ca ) et sur le site Web de la Société (www.championiron.com ) le 28 mai 2026.
| _____________________________ | |
| 1 | Le coût comptant C1 et les liquidités disponibles sont, respectivement, un ratio financier et une mesure financière non conformes aux IFRS, qui n'ont pas de définition standard en vertu des IFRS et qui pourraient ne pas être comparables à des mesures financières similaires utilisées par d'autres émetteurs. Le coût comptant C1 est défini comme étant le coût des ventes avant les coûts marginaux liés aux frais de démarrage du Lac Bloom (le cas échéant), divisé par les tms de concentré de minerai de fer vendues. Cette mesure est un outil important qui permet de suivre la performance au niveau des coûts opérationnels. Les liquidités disponibles englobent la trésorerie et les équivalents de trésorerie, les placements à court terme (le cas échéant) et les montants inutilisés sur les facilités de crédit. La Société utilise les liquidités disponibles pour mesurer les liquidités lui permettant de répondre aux exigences des prêteurs, financer ses dépenses en immobilisations et soutenir ses opérations. Le coût comptant C1 pour le trimestre terminé le 31 mars 2026 et les liquidités disponibles au 31 mars 2026 sont non audités. Un rapprochement des mesures conformes aux IFRS les plus comparables au coût comptant C1 et aux liquidités disponibles des trimestres précédents divulgués dans ce communiqué a été intégré par renvoi et peut être consulté à la rubrique 20 du rapport de gestion de la Société pour le trimestre et la période de neuf mois terminés le 31 décembre 2025, disponible auprès de l'ASX à l'adresse www.asx.com.au, sur SEDAR+ à l'adresse www.sedarplus.ca et sur le site Web de la Société à la section Investisseurs à l'adresse www.championiron.com. |
SOURCE Champion Iron Limited

Pour plus de renseignements: Pour plus de renseignements : Champion Iron Limited, Michael Marcotte, CFA, Vice-président sénior au développement corporatif et aux marchés des capitaux, +1-514-316-4858, poste 1128, [email protected]
[Champion Iron s'engage dans des projets performants,
à faible impact environnemental.
---------------------------------------------------------------------------------------
\
Investissez dans l'avenir brillant des mines\
‘Voir notre plus récent rapport d'activité»
](https://www.championiron.com/investisseurs/telecharger-le-guide-de-linvestisseur/?lang=fr)
Inscrivez-vous à l’infolettre Champion Iron
Voir tous les prix du marché »
Voir tous les prix du marché »
Siège social
Montréal
1155 René-Lévesque West
Suite 3300
Montréal QC H3B 3X7
Tél.: +1 514 316 4858
Téléc.: +1 514 871 8270
Australie
91, Evans Street
Rozelle NSW 2039
Tél.: +61 2 98107816
Téléc.: +61 2 86555017
Toronto
20, Adelaide Street East
Suite 200
Toronto ON M5C 2T6
Tél.: +1 416 866-2200
Sans frais (Amérique du Nord) :
+1 877 448-2201
Téléc.: +1 416 361-1333
Inscrivez-vous à l’infolettre Champion Iron pour suivre notre croissance
×
(opens in a new window)
Press Releases
Consult our newsletters (PDF) »
CHAMPION IRON REPORTS ITS FY2026 FOURTH QUARTER PRODUCTION AND SALES
-
Quarterly production of 3.4M wmt, sales of 3.5M dmt and cash costs of approximately $82.7/dmt1
-
DRPF project commissioning advancing as planned, with initial production tests successfully completed in March 2026 and production of commercially sellable product expected by the end of calendar Q2 2026
-
The previously announced acquisition of Rana Gruber, a proven high-purity iron ore producer in Norway, closed in April 2026
MONTRÉAL, April 29, 2026 /CNW/ - SYDNEY, April 30, 2026 - Champion Iron Limited (ASX: CIA) (TSX: CIA) (OTCQX: CIAFF) ("Champion" or the "Company") reports production results and mining operating expenditures for its financial fourth quarter ended March 31, 2026. Detailed operational and audited annual financial results are scheduled to be released prior to the Company hosting a conference call and webcast on May 28, 2026.
Champion's CEO, Mr. David Cataford, said: "Our team remains focused on efficiency and disciplined execution as we advance initiatives to optimize operations, strengthen sales performance and progress our growth projects. Concurrently, our DRPF project remains on schedule, with first sellable commercial production expected in the second quarter of the calendar year. In parallel, the recent closing of the Rana Gruber ASA ("Rana Gruber") transaction marks a significant milestone for Champion. It reinforces our leadership as a low carbon producer of high-purity iron ore while expanding our cash flows, positioning us to capitalize on opportunities to maximize long-term value for our shareholders and the communities in which we operate."
Conference Call Details
Champion will host a conference call and webcast on May 28, 2026, at 9:00 AM (Montréal time) / 11:00 PM (Sydney time) to discuss the results of the fourth quarter and financial year ended March 31, 2026. The conference call details are set out at the end of this press release.
1. Quarterly Highlights
Operations and Sustainability
- No serious workplace-related injuries or major environmental incidents were reported during the three-month period ended March 31, 2026;
- Quarterly production of 3.4 million wmt of high-purity 66.2% Fe concentrate for the three-month period ended March 31, 2026, an 8% increase over the same prior-year period, and comparable to that of the second quarter of the 2026 financial year, during which the Company also completed scheduled semi-annual maintenance at both concentration plants;
- Quarterly sales of 3.5 million dmt for the three-month period ended March 31, 2026, comparable to the same prior-year period, despite a railway interruption caused by a third-party train derailment that lasted until January 4, 2026, with continued rail service disruptions thereafter until the rail operator's activities resumed to normal, as well as particularly challenging winter conditions;
- Iron ore concentrate stockpiled at Bloom Lake and at the port decreased to 1.3 million wmt as at March 31, 2026, from 1.5 million wmt as at December 31, 2025; and
- Strong mining performance at Bloom Lake with 20.9 million wmt of material mined and hauled during the three-month period ended March 31, 2026, an increase of 3% compared to the same prior-year period, driven by additional and improved utilization of loading and drilling equipment and haul trucks availability.
Financial Results
- C1 cash cost for the iron ore concentrate loaded onto vessels at the Port of Sept-Îles totalled approximately $82.7/dmt1 (US$60/dmt), an increase of 12% quarter-over-quarter, mainly attributable to the scheduled semi-annual maintenance at both concentration plants, and an increase of 3% year-over-year. C1 cash cost for the three-month period ended March 31, 2026, was negatively impacted by higher land transportation and port handling costs, with lower volumes transported to the port yard facilities due to the train derailment and severe winter conditions, along with a significant rise in fuel prices at the end of the quarter attributable to the conflict in the Middle East;
- Cash balance, excluding the unused portion of the initial cash contributions from Nippon Steel Corporation ("Nippon Steel") and Sojitz Corporation ("Sojitz", and collectively with Nippon Steel, the "Partners") that is held in a restricted cash account by Kami Iron Mine Partnership (the "Kami Partnership"), totalled $296.8 million as at March 31, 2026, an increase of $51.7 million since December 31, 2025, benefiting from robust net cash flows from operating activities, while the Company continued to advance the DRPF project and invest in sustainable capital expenditures; and
- Strong available liquidity of $812.4 million1 as at March 31, 2026, compared to $751.4 million1 as at December 31, 2025, supporting growth initiatives and general corporate purposes.
DRPF Project Update
- DRPF project, designed to upgrade up to half of Bloom Lake's capacity to DR quality pellet feed iron ore grading up to 69% Fe, progressed as planned. The initial sellable production is anticipated to occur by the end of the second quarter of the 2026 calendar year, with production volumes gradually increasing thereafter;
- Commissioning activities advanced concurrently with construction work, with the strengthening of pre-operational verifications and wet commissioning, enabling the successful completion of the initial production tests in March 2026; and
- Quarterly and cumulative investments totalled approximately $39 million and $480 million, respectively, as at March 31, 2026, compared to an estimated cumulative investment of $500 million.
Development and Other Growth Initiatives
- On April 10, 2026, the Company completed its acquisition of Rana Gruber, on the terms of its previously announced recommended voluntary cash tender offer. 92.48% of the issued and outstanding shares of Rana Gruber were deposited in the tender offer. The Company subsequently completed the compulsory acquisition of the remaining shares and became the owner of 100% of the shares of Rana Gruber on April 17, 2026. The transaction was finalized at a total purchase price of approximately US$300 million, plus related fees and expenses (the "Acquisition"), and was funded from a combination of a new secured 4-year US$150 million term loan (the "Term Loan"), the net proceeds of an equity private placement of US$100 million from Caisse de dépôt et placement du Québec, and cash on hand. Additional details on the Acquisition are available in the Company's press release dated April 10, 2026 (Montréal), available under its profile on the ASX at www.asx.com.au , SEDAR+ at www.sedarplus.ca , and the Company's website at www.championiron.com ;
- In connection with the Acquisition, Champion and certain of its subsidiaries refinanced the Company's syndicated senior credit facilities, effective on April 1, 2026, in order to, among other things, extend the maturity to April 2030, establish the Term Loan and amend the US$400 million senior secured revolving credit facility, including to take into account the Acquisition;
- Kami Iron Mine Partnership received financial support from Natural Resources Canada, under the First and Last Mile Fund (formerly the Critical Minerals Infrastructure Fund Program), to advance feasibility work for key energy and transportation infrastructure of the Kami Project; and
- Continued work on the Kami Project's definitive feasibility study ("DFS"), which is expected to be completed in the second half of the 2026 calendar year.
2. Bloom Lake Mine Operating Activities
The Company performs both its plants' scheduled maintenance in the second and fourth financial quarters, which may create significant quarter-over-quarter variances in production output and mining and processing costs.
| Q4 FY26 | Q3 FY26 | Q/Q Change | Q4 FY25 | Y/Y Change | |||
| Operating Data | |||||||
| Waste mined and hauled (wmt) | 10,979,800 | 12,088,600 | (9) % | 10,886,200 | 1 % | ||
| Ore mined and hauled (wmt) | 9,915,100 | 10,549,700 | (6) % | 9,470,100 | 5 % | ||
| Material mined and hauled (wmt) | 20,894,900 | 22,638,300 | (8) % | 20,356,300 | 3 % | ||
| Stripping ratio | 1.11 | 1.15 | (3) % | 1.15 | (3) % | ||
| Ore milled (wmt) | 9,744,200 | 10,443,200 | (7) % | 9,160,300 | 6 % | ||
| Head grade Fe (%) | 28.8 | 29.1 | (1) % | 29.2 | (1) % | ||
| Fe recovery (%) | 80.6 | 79.7 | 1 % | 78.3 | 3 % | ||
| Product Fe (%) | 66.2 | 66.5 | -- % | 66.5 | -- % | ||
| Iron ore concentrate produced (wmt) | 3,435,100 | 3,661,400 | (6) % | 3,167,000 | 8 % | ||
| Iron ore concentrate sold (dmt) | 3,455,400 | 3,895,300 | (11) % | 3,495,300 | (1) % |
Bloom Lake produced 3.4 million wmt of high-purity 66.2% Fe concentrate during the three-month period ended March 31, 2026, an 8% increase over the same period in 2025, mainly attributable to higher mill productivity and Fe recovery, partially offset by lower head grade. During the three-month period ended March 31, 2026, the Fe recovery rate increased to 80.6% from 78.3% for the same period in 2025, benefiting from improved performance of the gravimetric systems following work programs and operational optimizations. While Fe recovery rates are expected to fluctuate in accordance with the mine plan and variations in ore grade, the Company remains focused on improving and stabilizing Fe recovery rates over time.
Iron ore concentrate sales volumes during the three-month period ended March 31, 2026, were comparable to the same prior-year period, and exceeded production for the fifth consecutive quarter, as the Company continued to destock iron ore concentrate inventories stockpiled at Bloom Lake and at the Port of Sept-Îles. Volumes sold were negatively impacted by a third-party train derailment that interrupted rail service early in the period, with disruptions affecting a significant portion of the quarter. As a result, cumulative iron ore concentrate inventories at Bloom Lake and at the port totalled 1.3 million wmt as at March 31, 2026, compared to 1.5 million wmt as at December 31, 2025. The Company is currently evaluating on-site and port inventory management strategies in anticipation of the expected change to its product offering with DRPF quality iron ore, in order to maintain adequate levels of stockpiled iron ore concentrate to manage production and sales logistics.
During the three-month period ended March 31, 2026, the Company mined and hauled 20.9 million wmt of waste and ore, exceeding the 20.4 million wmt recorded in the same prior-year period. This strong mining performance was driven by the addition of loading equipment and the recent commissioning of a new drill, as well as improved utilization and availability of haul trucks. The stripping ratio for the three-month period ended March 31, 2026, was 1.11, compared to a 1.15 ratio recorded in the same prior-year period. Champion anticipates maintaining elevated stripping activity in upcoming periods, consistent with its LoM plan.
3. Cost of Sales and C1 Cash Cost
For the three-month period ended March 31, 2026, the cost of sales totalled approximately $286 million with a C1 cash cost of $82.7/dmt1, compared to $279.6 million with a C1 cash cost of $80.0/dmt1 for the same period in 2025.
While the Company improved its mining and processing costs during the quarter, this improvement was entirely offset by higher land transportation and port handling costs, as volumes hauled to the Port of Sept-Îles were significantly lower than in the comparative period, partly attributable to the train derailment mentioned above and severe winter conditions. This decline in iron ore concentrate transported led to a reduction in volume-based rebates and a lower absorption of fixed costs at the port yard facilities. Semi-annual contracted price indexation also contributed to the increase in land transportation and port handling costs during the quarter. Additionally, in March 2026, C1 cash cost began to be negatively impacted by a sharp increase in fuel prices caused by the conflict in the Middle East and related supply constraints.
4. Exploration Activities
During the three-month period ended March 31, 2026, the Company maintained all its properties in good standing and did not enter into any farm-in or farm-out arrangements.
During the three-month period ended March 31, 2026, approximately $1 million was incurred in exploration and evaluation expenditures, compared to $11.0 million for the same prior-year period. The lower investment level year-over-year reflected the transfer of the Kami properties to the Kami Partnership and the Partners' acquisition of the aggregate 49% interest in the Kami Partnership in September 2025.
Exploration and evaluation expenditures were related to activities carried out in Québec and Newfoundland and Labrador. Details on exploration projects, including maps, are available on the Company's website at www.championiron.com under the Operations & Projects section.
5. Conference Call and Webcast Information
A webcast and conference call to discuss the foregoing results will be held on May 28, 2026, at 9:00 AM (Montréal time) / 11:00 PM (Sydney time). Listeners may access a live webcast of the conference call from the Investors section of the Company's website at www.championiron.com/investors/events-presentations or by dialing toll free +1-888-699-1199 within North America or +61-2-8017-1385 from Australia.
An online archive of the webcast will be available by accessing the Company's website at www.championiron.com/investors/events-presentations . A telephone replay will be available for one week after the call by dialing +1-888-660-6345 within North America or +1-289-819-1450 overseas, and entering passcode 43604#.
About Champion Iron Limited
Champion is a high-purity iron ore producer with operations in Canada and Norway. Through its wholly-owned subsidiary Quebec Iron Ore Inc., Champion owns and operates the Bloom Lake Mining Complex located on the south end of the Labrador Trough, approximately 13 kilometres north of Fermont, Québec. Bloom Lake is an open-pit operation with two concentration plants that primarily source energy from renewable hydroelectric power, having a combined nameplate capacity of 15M wmt per year that produce low contaminant high-purity 66.2% Fe iron ore concentrate with a proven ability to produce a 67.5% Fe direct reduction quality iron ore concentrate. Champion transports its iron ore concentrate from Bloom Lake by rail, to a ship loading port in Sept-Îles, Québec. Benefiting from one of the highest purity resources globally, Champion is investing to be able to upgrade up to half of the Bloom Lake's mine capacity to a direct reduction quality pellet feed iron ore with up to 69% Fe. Bloom Lake's high-purity and lower contaminant iron ore products have attracted a premium to the P61 index (formerly the P62 index).
Champion also owns and operates Rana Gruber ASA, a Norwegian iron ore producer based in Mo i Rana, Nordland. With continuous production dating back to the 1960's, Rana Gruber produces approximately 1.8M dry metric tonnes per year of hematite and magnetite iron ore concentrates.
From its two operating mines, Champion has delivered iron ore concentrates to global markets, including China, Japan, the Middle East, Europe, South Korea, India and Canada. In addition to its producing mines, Champion holds a 51% interest in Kami Iron Mine Partnership, jointly owned with Nippon Steel Corporation and Sojitz Corporation, which owns the Kami Project. The Kami Project is located near available infrastructure, only 21 kilometres southeast of Bloom Lake. Champion also holds a portfolio of exploration and development projects in the Labrador Trough, including the Cluster II properties, situated within 60 kilometres south of Bloom Lake.
Cautionary Note Regarding Forward-Looking Statements
This press release contains certain information and statements that may constitute "forward-looking information" under applicable securities legislation ("Forward-Looking Statements"). Forward-Looking Statements are statements that are not historical facts and are generally, but not always, identified by the use of words such as "will", "plans", "expects", "is expected", "budget", "scheduled", "estimates", "continues", "forecasts", "projects", "predicts", "intends", "anticipates", "aims", "targets" or "believes", or variations of, or the negatives of, such words and phrases or state that certain actions, events or results "may", "could", "would", "should", "might" or "will" be taken, occur or be achieved. Inherent in Forward-Looking Statements are risks, uncertainties and other factors beyond the Company's ability to predict or control.
Specific Forward-Looking Statements
All statements, other than statements of historical facts, included in this press release that address future events, developments or performance that Champion expects to occur are Forward-Looking Statements. Forward-Looking Statements may include, among other things, Management's expectations regarding: (i) Bloom Lake's LoM, Fe recovery rates, production, economic and other benefits, and related opportunities and benefits; (ii) the project to upgrade the Bloom Lake iron ore concentrate to a higher grade and to convert approximately half of Bloom Lake's increased nameplate capacity of 15M wmt per year to commercially produce a DR quality pellet feed iron ore (the DRPF project), expected DRPF project timeline, capital expenditures, budget and financing, production metrics, technical parameters, pricing premiums, efficiencies, economic and other benefits, related engagement with, and expectations with respect to, prospective customers, the expected commissioning, commercial shipments of iron ore and ramping-up of the DRPF project and the impact thereof on production, sales and financial results and the timing thereof; (iii) the Kami Project's potential to produce a DR grade product, the completion of a DFS and the timing thereof; (iv) the Company's expectations related to the recently completed Acquisition of Rana Gruber; (v) the Company's shareholder return strategy; (vi) the shift in steel industry production methods, expected rising demand for higher-grade iron ore products and Direct Reduced Iron globally and related market deficit and higher premiums, and the Company's participation therein, contribution thereto and positioning in connection therewith, including the transition of the Company's product offering (including producing high-purity DRPF products) and the expansion of its geography and customer base, related investments and expected benefits thereof; (vii) maintaining elevated stripping activities; (viii) stockpiled ore levels and the Company's inventory management strategies; (ix) production and Fe recovery rates and levels, ore characteristics and the Company's performance and related strategies and work programs to optimize operations; (x) available liquidity and the Company's financial flexibility; and (xi) the Company's growth and opportunities generally.
Risks
Although the Company believes the expectations expressed in such Forward-Looking Statements are based on reasonable assumptions, such Forward-Looking Statements involve known and unknown risks, uncertainties and other factors, most of which are beyond the control of the Company, which may cause the Company's actual results, performance or achievements to differ materially from those expressed or implied by such Forward-Looking Statements. Factors that could cause actual results to differ materially from those expressed in Forward-Looking Statements include, without limitation: (i) future prices of iron ore; (ii) future transportation costs; (iii) general economic, competitive, political and social uncertainties; (iv) continued availability of capital and financing and general economic, market or business conditions; (v) timing and uncertainty of industry shift to electric arc furnaces, impacting demand for high-purity feed; (vi) failure of plant, equipment or processes, including those of third party providers or counterparties, to operate as anticipated; (vii) delays in obtaining governmental approvals, necessary permitting or in the completion of development or construction activities; (viii) the results of feasibility studies; (ix) changes in the assumptions used to prepare feasibility studies; (x) project delays; (xi) geopolitical events; (xii) the effects of catastrophes and public health crises on the global economy, the iron ore market and Champion's operations and (xiii) the Company's inability to successfully integrate Rana Gruber's business, systems and operations within anticipated timelines and at expected cost levels, and retain key employees; and potential undisclosed costs or liabilities associated with the Acquisition of Rana Gruber, as well as those factors discussed in the section entitled "Risk Factors" of the Company's Management's Discussion and Analysis for the financial year ended March 31, 2026, and for the quarter ended March 31, 2026, each available under the Company's profile on the ASX at www.asx.com.au
, SEDAR+ at www.sedarplus.ca
and the Company's website at www.championiron.com
.
There can be no assurance that any such Forward-Looking Statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such Forward-Looking Statements. Accordingly, readers should not place undue reliance on Forward-Looking Statements.
Additional Updates
All of the Forward-Looking Statements contained in this press release are given as of the date hereof or such other date or dates specified in the Forward-Looking Statements and are based upon the judgment and estimates of Champion's Management and information available to Management as at the date hereof. Champion disclaims any intention or obligation to update or revise any of the Forward-Looking Statements, whether as a result of new information, future events or otherwise, except as required by law. If the Company does update one or more Forward-Looking Statements, no inference should be drawn that it will make additional updates with respect to those or other Forward-Looking Statements. Champion cautions that the foregoing list of risks and uncertainties is not exhaustive. Readers should carefully consider the above factors as well as the uncertainties they represent and the risks they entail.
Abbreviations
Unless otherwise specified, all dollar figures stated herein are expressed in Canadian dollars. The following abbreviations are used throughout this release: US$ (United States dollar), Fe (iron ore), wmt (wet metric tonnes), dmt (dry metric tonnes), M (million), km (kilometers), LoM (life of mine), Bloom Lake or Bloom Lake Mine (Bloom Lake Mining Complex), DR (Direct Reduction), DRPF (Direct Reduction Pellet Feed), Kami Project (Kamistiatusset project), P62 index (Platts IODEX 62% Fe CFR China index) and P61 index (Platts IODEX 61% Fe CFR China index). The utilization of "Champion" or the "Company" refers to Champion Iron Limited and/or one, or more, or all of its subsidiaries, as applicable. The term "IFRS" refers to International Financial Reporting Standards as issued by the International Accounting Standards Board.
For additional information on Champion Iron Limited, please visit our website at: www.championiron.com .
This document has been authorized for release to the market by the Board of Directors.
The Company's audited Consolidated Financial Statements and associated Management's Discussion and Analysis for the year ended March 31, 2026, will be available under the Company's profile on the ASX (www.asx.com.au ), SEDAR+ (www.sedarplus.ca ) and the Company's website (www.championiron.com ) on May 28, 2026.
| ___________________________________ |
| 1 Each of C1 cash cost and available liquidity is a non-IFRS financial ratio and measure, respectively, with no standard definition under IFRS and might not be comparable to similar financial measures used by other issuers. C1 cash cost is defined as cost of sales before incremental costs related to Bloom Lake start-up costs (if any) divided by iron ore concentrate sold in dmt. This metric is an important tool to monitor operating cost performance. Available liquidity includes cash and cash equivalents, short-term investments (if any) and undrawn amounts of the credit facilities. The Company uses available liquidity to measure its liquidity to meet the requirements of lenders, fund capital expenditures and support operations. C1 cash cost for the three-month period ended March 31, 2026, and available liquidity as at March 31, 2026, are unaudited. A reconciliation to the most comparable IFRS measure of C1 cash cost and available liquidity from previous quarters disclosed in this release have been incorporated by reference and can be found in the section 20 -- Non-IFRS and Other Financial Measures of the Company's MD&A for the three and nine-month periods ended December 31, 2025, available on the ASX at www.asx.com.au, SEDAR+ at www.sedarplus.ca and on the Company's website under the Investors section at www.championiron.com. |
SOURCE Champion Iron Limited

Nouvelles
Consultez notre infolettre (PDF) »
CHAMPION IRON CONCLUT L'ACQUISITION DE RANA GRUBER
MONTRÉAL, le 10 avril 2026 /CNW/ - / SYDNEY, le 11 avril 2026 - Champion Iron Limited (TSX : CIA) (ASX : CIA) (OTCQX : CIAFF) (« Champion » ou la « Société ») est heureuse d'annoncer que les instructions de paiement ont été exécutées en vue du paiement et de la réalisation du règlement de son offre publique de rachat en espèces volontaire déjà annoncée (l'« offre ») visant l'acquisition de la totalité des actions émises et en circulation de Rana Gruber ASA (« Rana Gruber »), producteur norvégien de minerai de fer de haute pureté de premier plan, au prix de 79 NOK en espèces par action (la « transaction »). Champion a reçu des acceptations de l'offre visant un total de 34 297 377 actions détenues par les actionnaires de Rana Gruber, représentant 92,48 % de son capital-actions émis et en circulation et de ses droits de vote.
David Cataford, chef de la direction de Champion, a déclaré : « La clôture de cette transaction constitue une étape déterminante pour Champion. Le regroupement de nos activités nous permet de consolider notre leadership en tant que fournisseur responsable de minerai de fer de haute pureté produit avec une faible empreinte carbone, tout en préservant la culture, l'expertise et la fierté qui définissent nos deux sociétés. La proximité de Rana Gruber avec les clients européens renforce la portée commerciale des produits de haute pureté du Lac Bloom et de notre projet de production de matériel de qualité réduction directe pour boulettes, actuellement en phase de mise en service. Nous nous réjouissons d'entamer notre collaboration avec l'équipe de Rana Gruber afin de créer de la valeur pour nos parties prenantes et de continuer d'avoir une contribution positive dans nos communautés d'accueil. »
Le chef de la direction de Rana Gruber, M. Gunnar Moe, a ajouté : « Aujourd'hui, un nouveau chapitre s'amorce pour Rana Gruber. Forts de plus de 60 ans d'expérience, nous avons établi une expertise opérationnelle reconnue et une réputation de fournisseur de confiance pour l'industrie sidérurgique européenne. Cette transaction réunit des actifs complémentaires, mais également une vision commune pour renforcer notre position de chef de file dans le marché du minerai de fer de haute pureté. L'alignement de Champion sur notre stratégie, nos valeurs et notre approche responsable créent un fondement solide pour soutenir nos ambitions à long terme. Nous sommes convaincus que notre collaboration avec l'équipe de Champion renforcera notre capacité à générer des retombées positives pour nos employés, nos clients et la communauté de Mo i Rana ».
Aux termes de la réalisation de l'offre, Champion entend procéder à l'acquisition forcée des actions restantes en vertu des lois sur les valeurs mobilières norvégiennes applicables et de prendre des mesures pour retirer les actions de Rana Gruber de la cote d'Euronext Oslo Børs. Champion orientera désormais ses efforts sur sa collaboration avec l'équipe de Rana Gruber afin de tirer pleinement parti des occasions découlant de la transaction, tout en réduisant au minimum les répercussions potentielles sur les employés de Rana Gruber et la communauté de Mo i Rana.
Les avantages stratégiques de la transaction comprennent, notamment :
- Longue durée de vie de l'actif minier dans une juridiction stable avec un accès à l'énergie renouvelable.
- Producteur de minerai de fer bien établi avec une production continue remontant aux années 1960, ayant produit, en 2025, plus de 1,8 million de tonnes de minerai de fer de haute pureté, et ayant un projet de mise à niveau pour la production d'un concentré à 65 % Fe.
- Solides antécédents en matière de marges de flux de trésorerie et de bénéfices nets, soutenus par des coûts de maintien concurrentiels intégrés et la proximité des clients.
- Élargissement du portefeuille de produits de la Société, notamment avec différents mélanges de concentré d'hématite de haute pureté et de produit de spécialité de magnétite utilisés dans des secteurs alternatifs qui génèrent des primes par rapport à l'indice Platts IODEX CFR Chine pour le minerai de fer à 65 % Fe (l'« indice P65 »).
- Création d'un producteur de minerai de fer de haute pureté de plus grande portée et plus diversifié, avec des possibilités de collaboration en matière de stratégie des ventes misant sur une approche client établie en Europe, qui diversifiera davantage la composition des ventes de la Société.
- Création de valeur à court terme par action ordinaire, qui devrait avoir une incidence favorable sur les produits d'exploitation, le BAIIA et les flux de trésorerie provenant des activités d'exploitation de Champion.
- Les ratios d'endettement sont maintenus à des niveaux proches des niveaux antérieurs à l'annonce grâce à la structure de financement.
- Vision alignée pour desservir la chaîne d'approvisionnement de l'acier vert grâce à la récente mise à niveau de Rana Gruber pour augmenter sa production de concentré de minerai de fer (65 % Fe), et à d'autres occasions d'amélioration supplémentaire de la teneur.
- L'obtention d'un investissement stratégique par la Caisse de dépôt et placement du Québec ("La Caisse") témoigne d'un engagement continu envers la Société, tout en permettant l'expansion et la diversification de sa base d'actifs, tant au Québec que sur les marchés internationaux.
Financement de la transaction
Le prix d'acquisition de la transaction, s'élevant au total à environ 300 millions de dollars américains, et les frais connexes ont été financés au moyen d'une combinaison de liquidités, du produit net du placement privé d'actions de 100 millions de dollars américains réalisé par Champion avec La Caisse et d'une nouvelle facilité de prêt à terme garanti d'un montant de 150 millions de dollars américains (le « prêt à terme ») établie aux termes de la facilité de crédit consortiale de la Société. Dans le cadre de la transaction, la Société et certaines de ses filiales ont refinancé, avec prise d'effet le 1er avril 2026, la facilité de crédit consortiale de la Société afin, entre autres, de repousser son échéance à quatre ans, d'établir la facilité de prêt à terme et d'apporter certaines autres modifications à la facilité de crédit renouvelable garantie de premier rang de 400 millions de dollars américains (la « facilité renouvelable ») établie en vertu de la facilité de crédit, y compris pour tenir compte de la transaction. Le prêt à terme a été souscrit uniquement sous la direction de La Banque de Nouvelle-Écosse (la « Banque Scotia »), puis syndiqué avec le coarrangeur, Société Générale. Le prêt à terme comprenait la participation de la Banque Royale du Canada, de Valeurs Mobilières TD, d'Exportation et développement Canada, de la Banque Nationale du Canada et de Mouvement Desjardins, qui agissent tous à titre de chefs de file désignés et de co-chefs de file de livres dans le cadre de la facilité renouvelable consortiale, en plus de la participation de plusieurs autres groupes canadiens et internationaux de premier plan.
Clarksons Securities AS agit à titre de conseiller financier de Champion, alors que Advokatfirmaet BAHR AS, Stikeman Elliott S.E.N.C.R.L., s.r.l., Ashurst LLP et McCarthy Tétrault S.E.N.C.R.L., s.r.l., agissent à titre de conseillers juridiques de Champion.
À propos de Champion Iron Limited
Champion, par l'entremise de sa filiale en propriété exclusive Minerai de fer Québec inc., détient et exploite le complexe minier du Lac Bloom situé à l'extrémité sud de la Fosse du Labrador, à environ 13 kilomètres au nord de Fermont, Québec. La mine du Lac Bloom est une mine à ciel ouvert avec deux usines de concentration qui s'alimentent principalement en énergie hydroélectrique renouvelable, ayant une capacité nominale combinée de 15 millions de tonnes métriques humides par année. Les deux usines de concentration produisent du concentré de minerai de fer de haute pureté (66,2 % Fe) avec de plus faibles teneurs en contaminants et ont prouvé leur capacité à produire un concentré de qualité supérieure destiné à la réduction directe (67,5 % Fe). Bénéficiant de l'une des ressources les plus pures au monde, Champion investit pour moderniser la moitié de la capacité de la mine du Lac Bloom afin de produire du matériel de qualité réduction directe pour boulettes pouvant atteindre 69 % Fe. Les produits de minerai de fer de haute pureté et à plus faible teneur en contaminants du Lac Bloom ont su se mériter une prime par rapport à l'indice P62. Champion expédie son concentré de minerai de fer du Lac Bloom par rail jusqu'au port de chargement situé à Sept-Îles, Québec, et l'a livré à l'échelle mondiale, incluant en Chine, au Japon, au Moyen‑Orient, en Europe, en Corée du Sud, en Inde et au Canada. En plus du Lac Bloom, Champion détient une participation de 51 % dans Kami Iron Mine Partnership, une entité aussi détenue par Nippon Steel Corporation et Sojitz Corporation, qui possède le projet Kami. Le projet Kami est situé à proximité d'infrastructures disponibles, à seulement 21 kilomètres au sud-est du Lac Bloom. Champion possède également un portefeuille de projets d'exploration et de développement dans la Fosse du Labrador, incluant le portefeuille de propriétés Cluster II situé à moins de 60 kilomètres au sud du Lac Bloom.
À propos de Rana Gruber
Rana Gruber est un producteur norvégien de minerai de fer de haute pureté basé à Mo i Rana, dans le comté de Nordland, dont les propriétés bénéficient d'un héritage remontant à plus de 200 ans d'expertise minière. Fondée en 1964, Rana Gruber a été inscrite à la Bourse d'Oslo en 2021. Les opérations actuelles de l'entreprise s'appuient sur une exploitation souterraine ainsi que des fosses à ciel ouvert à proximité, et bénéficient d'une vaste base de ressources qui pourrait permettre de maintenir les niveaux de production actuels pendant des décennies. La zone minière est reliée par un chemin de fer public à son usine de traitement côtière, située à environ 35 kilomètres, laquelle bénéficie d'un accès direct à un terminal portuaire dédié. Rana Gruber extrait et traite des ressources minérales naturelles afin de produire différents types de concentrés de minerai de fer. L'entreprise produit deux différents concentrés d'hématite, dont une version récemment améliorée à une teneur de 65 % Fe, principalement destinée à la production d'acier pour des clients en Europe. Rana Gruber produit aussi un concentré de magnétite, un oxyde de fer de haute pureté utilisé dans des secteurs autres que la métallurgie traditionnelle, tels que la purification de l'eau et les applications chimiques industrielles en Europe, et qui a généré une prime par rapport à l'indice P65 au fil du temps. Grâce à son accès à l'énergie renouvelable, l'entreprise se classe parmi les producteurs de minerai de fer de haute pureté affichant les plus faibles émissions de carbone par tonne de concentré de minerai de fer produite à l'échelle mondiale.
Pour obtenir de plus amples renseignements, veuillez communiquer avec :
**Champion Iron Limited
**Michael Marcotte, CFA
Vice-président sénior, Développement corporatif et marchés des capitaux
+1-514-316-4858, poste 1128
[email protected]
Pour plus de renseignements sur Champion Iron Limited, veuillez visiter notre site Web à l'adresse : www.championiron.com .
La diffusion du présent communiqué de presse a été autorisée par David Cataford, chef de la direction de Champion Iron Limited.
Renseignements concernant Rana Gruber
La description de Rana Gruber et certains renseignements à son sujet qui figurent dans le présent communiqué de presse sont fondés sur des renseignements rendus publics par Rana Gruber dans des documents pouvant être consultés sous le profil de Rana Gruber sur le système d'information électronique d'Euronext Oslo Børs, à l'adresse https://newsweb.oslobors.no/ , et sur des renseignements n'étant pas de notoriété publique qui ont été fournis par Rana Gruber à la Société. Ces renseignements n'ont pas fait l'objet d'un audit indépendant par la Société. Par conséquent, il subsiste un niveau de risque inévitable quant à l'exactitude et à l'exhaustivité de l'information concernant Rana Gruber contenue dans le présent communiqué de presse.
Personne qualifiée
Vincent Blanchet, P. Eng., ingénieur chez Minerai de fer Québec inc., est une « personne qualifiée » au sens du Règlement 43-101 sur l'information concernant les projets miniers et a examiné et approuvé, ou a préparé, selon le cas, la divulgation des renseignements scientifiques et techniques contenus dans le présent communiqué de presse et a confirmé que les renseignements pertinents présentent fidèlement les données et les études disponibles ayant trait aux projets pertinents. Vincent Blanchet est membre de l'Ordre des ingénieurs du Québec.
Énoncés prospectifs
Le présent communiqué de presse, les déclarations verbales faites au sujet de la transaction ou de l'offre et les autres renseignements publiés par Champion contiennent de l'information et des déclarations qui peuvent constituer de l'« information prospective » ou des « énoncés prospectifs » aux termes des lois sur les valeurs mobilières norvégiennes applicables (les « énoncés prospectifs »). Les énoncés prospectifs sont des énoncés qui ne sont pas des faits historiques et qui sont généralement, mais pas toujours, identifiés par l'emploi de termes comme « sera », « planifie », « s'attend à », « devrait », « budgète », « est prévu », « estime », « continue », « prévoit », « projette », « prédit », « a l'intention de », « anticipe », « vise », « cible » ou « est d'avis », ou toute variation de ces termes, y compris leur forme négative, ou des énoncés à l'effet que certaines actions et certains événements ou résultats « peuvent », « doivent », « pourraient », « devraient », « pourront » ou « devront » survenir, se réaliser ou être entrepris. Les énoncés prospectifs comportent des risques inhérents, des incertitudes et d'autres facteurs indépendants de la volonté de la Société ou qu'elle ne peut prévoir.
Tous les énoncés compris dans le présent communiqué de presse qui ne sont pas des énoncés de faits historiques et qui concernent des événements, des développements ou des réalisations futurs constituent des énoncés prospectifs. Les énoncés prospectifs comprennent, entre autres, des énoncés sur les effets que la transaction devrait avoir sur la Société, y compris l'incidence par action ordinaire de la création de valeur à court terme sur les produits d'exploitation de Champion, le BAIIA et les flux de trésorerie provenant des activités d'exploitation, l'acquisition forcée prévue des actions restantes de Rana Gruber et sur leur radiation, ainsi que d'autres énoncés qui ne sont pas des faits historiques. Ces énoncés prospectifs sont de nature prospective et ne sont pas fondés sur des faits passés, mais plutôt sur des attentes actuelles et sur de nombreuses hypothèses concernant les stratégies commerciales et l'environnement dans lequel Champion et/ou Rana Gruber pourraient exercer leurs activités dans l'avenir.
Bien que la Société croie que les attentes exprimées dans ces énoncés prospectifs sont basées sur des hypothèses raisonnables, de tels énoncés prospectifs comportent des risques, impondérables et d'autres facteurs connus et inconnus, dont la plupart sont indépendants de la volonté de ces parties, ce qui pourrait faire en sorte que les résultats, le rendement ou les réalisations réels diffèrent sensiblement de ceux qui sont exprimés ou sous-entendus dans ces énoncés prospectifs. Parmi les facteurs qui pourraient faire en sorte que les résultats réels diffèrent sensiblement des résultats exprimés dans les énoncés prospectifs, citons notamment la capacité de Champion d'intégrer avec succès les activités, les processus, les systèmes et l'exploitation de Rana Gruber et de fidéliser les employés clés, l'incapacité éventuelle de tirer les avantages prévus de la transaction visant Rana Gruber, la foi accordée par Champion aux renseignements fournis par Rana Gruber en ce qui concerne la transaction visant Rana Gruber ainsi qu'à l'information publique, les coûts ou les responsabilités non divulgués éventuels associés à la transaction visant Rana Gruber, la capacité de Champion d'obtenir et d'attirer de nouvelles occasions d'affaires, de réaliser des synergies et de maintenir sa position sur le marché grâce à des plans d'intégration réussis relatifs à la transaction visant Rana Gruber, la capacité de Champion à réaliser l'intégration de Rana Gruber dans les délais et selon les coûts prévus, les estimations et les attentes de la direction en ce qui concerne les conditions économiques et commerciales futures et d'autres facteurs liés à la transaction visant Rana Gruber, la réalisation des avantages stratégiques, financiers et autres attendus de la transaction visant Rana Gruber, l'exactitude et l'exhaustivité des informations publiques et des autres informations (notamment les informations financières) communiquées par Rana Gruber, ainsi que les facteurs traités ou mentionnés dans la section portant sur les facteurs de risque des rapports de gestion de Champion pour le quatrième trimestre et l'exercice clos le 31 mars 2025, ainsi que pour les périodes de trois et de neuf mois closes le 31 décembre 2025, qui peuvent être consultés sur le profil SEDAR+ de Champion à l'adresse www.sedarplus.ca , auprès de l'ASX à l'adresse www.asx.com.au , et sur le site Web de Champion à l'adresse www.championiron.com .
Si l'un ou plusieurs de ces risques ou impondérables se concrétisent ou si l'une ou plusieurs des hypothèses s'avèrent erronées, les résultats réels pourraient différer sensiblement de ceux attendus, estimés ou projetés. Les énoncés prospectifs devraient donc être interprétés à la lumière de ces facteurs. Ni Champion, ni aucun membre de son groupe, ni aucun de ses membres, associés ou administrateurs, dirigeants ou conseillers ne font de déclaration ni ne donnent de garantie à l'effet que les événements exprimés ou sous-entendus dans les énoncés prospectifs qui figurent dans la présente annonce se produiront réellement. Compte tenu de ces risques et impondérables, les investisseurs potentiels ne devraient pas se fier aux énoncés prospectifs.
Tous les énoncés prospectifs qui figurent dans la présente annonce sont donnés en date des présentes et sont fondés sur les avis, les estimations et sur l'information disponibles à la date des présentes. Champion n'a ni intention ni l'obligation de mettre à jour ou de réviser ces énoncés prospectifs, notamment à la lumière de nouveaux renseignements, d'événements futurs ou pour d'autres raisons, à moins que la loi ne l'y oblige. Le fait de mettre à jour certains énoncés prospectifs ne signifie pas que d'autres mises à jour de ces énoncés prospectifs ou d'autres énoncés prospectifs seront faits. La liste des risques et des incertitudes cités précédemment n'est pas exhaustive. Les lecteurs devraient examiner attentivement les facteurs susmentionnés, ainsi que les incertitudes qu'ils représentent et les risques qu'ils comportent.
SOURCE Champion Iron Limited

[Champion Iron s'engage dans des projets performants,
à faible impact environnemental.
---------------------------------------------------------------------------------------
\
Investissez dans l'avenir brillant des mines\
‘Voir notre plus récent rapport d'activité»
](https://www.championiron.com/investisseurs/telecharger-le-guide-de-linvestisseur/?lang=fr)
Inscrivez-vous à l’infolettre Champion Iron
Voir tous les prix du marché »
Voir tous les prix du marché »
Siège social
Montréal
1155 René-Lévesque West
Suite 3300
Montréal QC H3B 3X7
Tél.: +1 514 316 4858
Téléc.: +1 514 871 8270
Australie
91, Evans Street
Rozelle NSW 2039
Tél.: +61 2 98107816
Téléc.: +61 2 86555017
Toronto
20, Adelaide Street East
Suite 200
Toronto ON M5C 2T6
Tél.: +1 416 866-2200
Sans frais (Amérique du Nord) :
+1 877 448-2201
Téléc.: +1 416 361-1333
Inscrivez-vous à l’infolettre Champion Iron pour suivre notre croissance
×
(opens in a new window)
Prompts
Click prompts to add them under the company line, click again to take one out, then copy the result into your AI chat. Shared by Asian Century Stocks and Uncovered Thai Stocks. Thank you.
ETFs Holding Champion Iron Limited
Exchange-traded funds whose newest published daily portfolio holds one of the company's listings, largest weight first.
| ETF | Weight in ETF | Shares | Market value | As of |
|---|---|---|---|---|
| AVDV | 0.08% | 11,310,486 | $ 14.895M | Nov 16, 2026 |
| DISV | 0.04% | 1,358,456 | $ 1.933M | Nov 12, 2026 |
| AVDS | 0.02% | 53,890 | $ 70.97K | Nov 16, 2026 |
| DFSI | 0.01% | 49,809 | $ 70.893K | Nov 12, 2026 |
| DFIC | 0.01% | 569,472 | $ 810.523K | Nov 12, 2026 |
| DFAX | 0.00% | 22,852 | $ 32.525K | Nov 12, 2026 |
| AVDE | 0.00% | 132,825 | $ 174.922K | Nov 16, 2026 |