Exhibit 99.1 JOHANNESBURG, 1 September 2026: Sibanye Stillwater Limited (Sibanye-Stillwater or the Group) (JSE: SSW and NYSE: SBSW) is pleased to report operating results and consolidated interim financial statements for the six months ended 30…
Exhibit 99.1
JOHANNESBURG, 1 September 2026: Sibanye Stillwater Limited (Sibanye-Stillwater or the Group) (JSE: SSW and NYSE: SBSW) is pleased to
report operating results and consolidated interim financial statements for the six months ended 30 June 2026 (H1 2026).
SALIENT FEATURES FOR THE SIX MONTHS ENDED 30 JUNE 2026 (H1 2026) COMPARED WITH 30 JUNE 2025 (H1 2025) (YEAR-ON-YEAR)
•During H1 2026, the Group delivered its best safety performance based on lagging indicators. Tragically, following a fatality-free Q1
2026, the Group experienced a fatal incident at its SA PGM operations and a fatal incident at its SA gold operations. We mourn the
loss of three colleagues as a result of these incidents
•Exceptional financial performance, with record revenue of R90bn (US$5.5bn), up 64%, and adjusted EBITDA of R31.8bn (US$1.9bn), up
111%, supported by stable operational delivery and stronger commodity prices
•Significant increase in profitability, generating a profit of R18.8bn (US$1.1bn)
•Record net cash from operating activities of R19.6bn (US$1.2bn), with 45% of adjusted EBITDA converted into notional free cash flow of
R14.5bn (US$881m)
•High operating margins from the SA portfolio, with SA PGM and SA gold all-in sustaining cost (AISC) margins of 44% and 32%,
respectively
•Disciplined capital allocation resulted in a 20% reduction in gross debt year-on-year to R32.1 billion (US$1.99bn), and an 18% reduction
from H2 2025, while net debt halved and net debt to adjusted EBITDA gearing ratio improved to 0.18x
•Strong cash generation supported the declaration of an interim dividend of R5.7bn (US$352m) equivalent to 201 SA cents per share
(49.73 US cents per ADR) at upper end of policy range, representing a 6.6%
10
trailing 12-month yield and an 8%
10
implied annualised
yield based on the interim dividend
•High-return, organic growth investment confirmed for Burnstone (adding >130kozpa gold) and Mt Lyell (adding ~26ktpa copper), in
addition to the four SA PGM brownfields projects already in execution, and Keliber ramping up operations with 217.5kt ore mined
KEY STATISTICS – GROUP
US dollarSA rand
Six months endedSix months ended
Jun 2025Dec 2025Jun 2026KEY STATISTICSJun 2026Dec 2025Jun 2025
GROUP
(194) (94) 1,082 US$mBasic earningsRm 17,745 (1,580) (3,591)
292 94 1,036 US$mHeadline earningsRm 17,002 1,540 5,372
818 1,297 1,941 US$mAdjusted EBITDA
1
Rm 31,843 22,727 15,073
(211) (53) 1,147 US$mProfit/(loss) for the periodRm 18,807 (833) (3,906)
18.39 17.38 16.41 R/US$Average exchange rate using daily closing rate
TABLE OF CONTENTS
Page
Share data for the Six months ended 30 June 2026
Key statistics by region2
Number of shares in issue
Overview by the Chief executive officer3
- at 30 June 20262,830,567,264
Detailed safety and operational information 6
Financial review11
- weighted average2,830,567,264
Salient features and cost benchmarks - six months16
Free Float 100 %
Consolidated interim results21
Bloomberg/ReutersSSWSJ/SSWJ.J
Notes to the consolidated interim financial statements25
Segment reporting – six months26
JSE Limited - (SSW)
All-in cost (reconciliation) – six months42
Price range per ordinary share (high/low)R82.23 to R34.82
Reconciliation of operating cost excluding third party PoC43
Average daily volume14,348,151
Non-IFRS measures
49
Administration and corporate information
54
NYSE - (SBSW); one ADR represents four ordinary shares
Disclaimer and forward-looking statements
55
Price range per ADR (high/low)US$21.12 to US$8.49
Average daily volume6,492,708
Sibanye-Stillwater Operating and financial results | Six months ended 30 June 2026 1
KEY STATISTICS BY REGION
US dollarSA rand
Six months endedSix months ended
Jun 2025Dec 2025Jun 2026KEY STATISTICSJun 2026Dec 2025Jun 2025
SOUTHERN AFRICA (SA) OPERATIONS
SA PGM operations
804,252 920,526 789,647 oz4E PGM production
2,3
kg 24,561 28,632 25,015
1,429 2,009 2,681 US$/4EozAverage basket priceR/4Eoz 43,996 34,914 26,283
260 673 1,170 US$mAdjusted EBITDA
1
Rm 19,207 11,904 4,778
1,299 1,407 1,600 US$/4EozAll-in sustaining cost
1,4
R/4Eoz 26,252 24,457 23,892
SA gold operations
300,191 332,149 293,665 ozGold producedkg 9,134 10,331 9,337
3,049 3,706 4,597 US$/ozAverage gold priceR/kg 2,425,219 2,070,774 1,802,580
260 440 549 US$mAdjusted EBITDA
1
Rm 8,995 7,696 4,809
2,430 2,589 3,105 US$/ozAll-in sustaining cost
1,4
R/kg 1,638,089 1,446,794 1,436,817
INTERNATIONAL OPERATIONS
US PGM underground operations
141,124 142,945 137,930 oz2E PGM production
2,5
kg 4,290 4,446 4,389
985 1,380 1,672 US$/2EozAverage basket priceR/2Eoz 27,438 23,978 18,114
151 98 66 US$mAdjusted EBITDA
1
Rm 1,086 1,669 2,775
1,207 1,198 1,347 US$/2EozAll-in sustaining cost
1,4,6
R/2Eoz 22,105 20,819 22,200
Recycling operations
7
147 81
164 US$mAdjusted EBITDA
1
Rm 2,683
1,371 2,707
Keliber lithium project
(6) (7) (15) US$mAdjusted EBITDA
1
Rm (250) (113) (112)
Century zinc retreatment operation
51 49 45 ktZnPayable zinc production
8
ktZn 45 49 51
2,626 2,812 3,294 US$/tZnAverage equivalent zinc concentrate price
9
R/tZn 54,047 48,878 48,294
36 52 55 US$mAdjusted EBITDA
1
Rm 900 925 657
1,762 2,094 2,162 US$/tZnAll-in sustaining cost
1,4
R/tZn 35,477 36,399 32,411
1
The Group reports adjusted earnings before interest, taxes, depreciation and amortisation (EBITDA) based on the formula included in the facility agreements for compliance with the debt
covenant formula. The Group also reports All-in sustaining costs (AISC) for comparison to similar industry metrics used in the mining industry. See "Non-IFRS measures" for more information on these
metrics presented by Sibanye-Stillwater. Adjusted EBITDA may not be comparable to similarly titled measures of other companies. Adjusted EBITDA and AISC are not measures of performance
under IFRS Accounting Standards and should be considered in addition to and not as a substitute for any other measure of financial performance and liquidity. For a reconciliation of profit/(loss)
before royalties and tax to adjusted EBITDA, see note 19 of the condensed consolidated financial statements. The adjusted EBITDA amount in US$m for the six months ended 31 December 2025 is
calculated using the adjusted EBITDA amount in US$m for the year ended 31 December 2025 less the adjusted EBITDA amount in US$m for the six months ended 30 June 2025
2
The Platinum Group Metals (PGM) production in the SA operations is principally platinum, palladium, rhodium and gold, referred to as 4E (3PGM+Au) and measured at the concentrator, and the
US underground operations is principally platinum and palladium, referred to as 2E (2PGM)
3
The SA PGM production excludes the production associated with the purchase of concentrate (PoC) from third parties. For a reconciliation of the production and third party PoC, refer to the
"Reconciliation of operating cost excluding third party PoC for Total SA PGM operations and Marikana - Six months"
4
See "Salient features and cost benchmarks - Six months" for the definition of All-in sustaining cost (AISC). The SA PGM All-in sustaining cost excludes the production and costs associated with third
party PoC
5
The US PGM operations’ underground production is converted to metric tonnes and kilograms, and financial performance is translated to SA rand (rand)
6
During the six months ended 30 June 2025 the US PGM operations recognised R2,466 million (US$139 million) which relates to Section 45X Advance Manufacturing Production Credits applicable
to the 2023 and 2024 financial reporting years and presented as a reduction to mining costs. The US PGM operations’ All-in sustaining cost for the six months ended 30 June 2025 were adjusted to
exclude the Section 45X Advance Manufacturing Production Credits applicable to the 2023 and 2024 financial reporting years
7
Recycling includes Reldan Pennsylvania (PA), Metallix North Carolina (NC) and Montana recycling sites. The acquisition of the NC site was concluded on 4 September 2025. The six months
ended 31 December 2025 only includes the results of the NC site since acquisition
8
Payable zinc production is the payable quantity of zinc metal produced after applying smelter content deductions
9
Average equivalent zinc concentrate price is the total zinc sales revenue recognised at the price expected to be received excluding the fair value adjustments divided by the payable zinc
sales
10
Based on the closing share price of R50.28 on 28 August 2026. The 6.6% trailing 12-month dividend yield is calculated using combined dividends of 332 SA cents per ordinary share, comprising the
H1 2026 interim dividend of 201 SA cents and the FY2025 final dividend of 131 SA cents. The 8.0% implied yield is calculated by annualising the H1 2026 interim dividend of 201 SA cents per
ordinary share and the same reference share price.
Sibanye-Stillwater Operating and financial results | Six months ended 30 June 2026 2
OVERVIEW BY RICHARD STEWART, CHIEF EXECUTIVE OFFICER OF SIBANYE-STILLWATER
In January 2026, we shared a refreshed Group strategy that prioritises our business fundamentals. This strategy outlined a focus on
optimising profitability, which, combined with disciplined capital allocation, would create flexibility to deliver long term value accretive
growth. During the period under review, we have continued to drive profitability through our strategic priorities including increasing
operating margins through performance excellence, improving cost efficiencies through simplification of our operating model, enhancing
capital returns through simplifying our portfolio and improving cash conversion.
A solid operational performance during H1 2026, combined with strong commodity prices, have generated significant earnings and cash.
This has not only demonstrated the value and earnings potential of our unique portfolio, but also allowed the company to materially
advance our short term strategic objective of strengthening the business fundamentals.
The Group delivered record revenue of R90bn (US$5.5bn), a 111% increase in adjusted EBITDA to R31.8bn (US$1.9bn), record net cash
from operating activities of R19.6bn (US$1.2bn) and a net profit of R18.8bn (US$1.1bn), compared to a net loss of R3.9bn (US$211m) for H1
2025. The quality of this result is reflected in the conversion of 45% of adjusted EBITDA into notional free cash flow of R14.5bn (US$881m).
The stronger financial position enabled the Group to deliver against its capital-allocation priorities. This includes declaring an interim
dividend of R5.7bn (US$352m), strengthening the balance sheet, with gross debt declining by 20% to R32.1 billion (US$1.99bn) and net debt
more than halving to R9.7bn (US$593m), reducing net debt to adjusted EBITDA to 0.18x, as well as continuing to invest in value-accretive
organic growth through commodity cycles.
Safe production
Safety remains our foremost priority and the foundation of performance excellence. The Group achieved its best-ever H1 total recordable
injury frequency rate (TRIFR) and serious injury frequency rate (SIFR), with both improving by 8%, while high-potential incidents reduced by
31%, reflecting real risk reduction in our operations.
These improvements were overshadowed by the tragic loss of Khanyile Magwebelele from our Marikana K3 shaft, and Thekololo Nkoe
and Xolisa Mtshutshwana from our Kloof Masimthembe shaft, in two separate incidents during Q2 2026, following a fatality-free first
quarter. We extend our deepest condolences to their families, friends and colleagues.
The sustained fatal free achievements across the majority of our operations, demonstrates our ability to eliminate fatal incidents and
serious harm, and achieving this consistently across the entire group remains our highest priority. To achieve this our focus prioritises visible
safety leadership, disciplined verification and application of critical controls, empowered teams, effective management routines and
sustained implementation of lessons learned across all operations. Detailed safety information is provided from page 6.
Operating performance
The SA PGM operations continued to deliver consistent production of 831,307 4Eoz (including third party purchase of concentrate),
reflecting a year on year decline of 1%, largely driven by lower surface production and lower attributable production from Mimosa.
Steady production output combined with disciplined cost management and significantly stronger 4E PGM basket prices (a 67% increase),
delivered strong earnings and cash generation for the Group. The SA PGM operations delivered an industry competitive 44% AISC margin,
while adjusted EBITDA increased by 302% to R19.2 billion (US$1.2 billion) and Notional free cash flow of R10.4 billion (US$631m) was
generated.
Production across the SA gold operations declined by 2% to 9,134kg (293,665oz), associated with a 9% decrease in underground
production, primarily due to the rebasing of the Kloof operations in H2 2025, offset by a 13% increase in surface production, reflecting the
transition towards a shallower, higher margin, longer-life portfolio. Higher sales volumes of 9,588kg (308,261oz), combined with a 35%
increase in the average gold price, resulted in the SA gold operations delivering record adjusted EBITDA of R9.0bn (US$549m), and
Notional free cash flow of R4.0bn (US$241m). Despite cost pressures, with AISC increasing by 14% to R1.64 million/kg (US$3,105/oz), due to
inflationary cost increases, higher royalties associated with increased profitability, higher pumping costs at Driefontein and higher third-
party aggregate purchase costs (due to higher gold prices) at Cooke, the SA gold operations delivered a robust 32% AISC margin. The
supportive gold-price environment provides an opportunity to assess the potential economic extraction of additional reserves at Kloof
beyond 2026, including through the support of appropriately priced hedging mechanisms.
The US PGM operations continued to advance their mechanisation strategy during H1 2026. Production decreased by 2% primarily due to
lower grades at East Boulder, while AISC increased by 12%, as planned investment, development activity and sustaining capital
expenditure increased in support of the transition to full mechanisation. Despite these near-term investments, AISC of US$1,347/2Eoz
(R22,105/2Eoz) remained below the lower end of annual guidance, supporting a 12% AISC margin. A 70% increase in the average 2E PGM
basket price, stronger by-product credits and Section 45X credits further supported profitability. The mechanisation strategy to reduce
AISC to approximately US$1,000/2Eoz by the end of 2028 progressed during the period under review, with progress across critical mine
development and successful testing of mechanised bolting equipment. In addition, engagements with organised labour and employees
has been progressing to secure a labour agreement supportive of the required transition to mechanisation and associated changes to a
team-based incentive scheme.
The Recycling operations delivered a standout H1 2026 performance, with increased scale, successful integration and feed optimisation
driving higher volumes, margin expansion and strong cash generation from the integrated recycling platform. Adjusted EBITDA increased
by 11% to US$164 million (R2.7 billion), and excluding the impact of Section 45X credits, the EBITDA margin improved to 13% from 5% in H1
2025. Normalising for S45X credits in both periods, underlying adjusted EBITDA increased by 536% year-on-year to US$137 million (R2.2
billion). This performance reflects the addition and successful integration of North Carolina, significantly higher Pennsylvania production,
operational and commercial synergies across the Recycling operations, favourable precious-metal prices and the optimisation of higher-
margin feed streams. The improved performance was further supported by disciplined working capital management, with precious metal
ounces recycled and sold increasing by 142% to 2.8 million precious metal ounces. Equivalent gold ounces recycled and sold amounted
to 244koz for H1 2026 (H1 2025: 165koz). The recycling business is a strategic contributor to Group earnings and cash generation, while
providing diversified exposure to precious metals through a scalable, capital-light processing platform.
The Century operation remained profitable and cash generative as the current tailings-retreatment operation approaches the end of its
life. The operation delivered a 54% increase in adjusted EBITDA to US$55 million (R900 million), with higher zinc concentrate prices and
lower treatment charges offsetting lower production as operational flexibility reduced towards the end of its current mine life. AISC
increased by 23% to US$2,162/tZn (R35,477/tZn) due to lower production volumes and inflationary cost pressures.
The Keliber lithium project achieved important milestones during H1 2026 as it progressed from construction towards commissioning and
operational readiness. Mining commenced at the Syväjärvi mine, with 217.5kt of ore mined and a strategic stockpile of 185.5kt
Sibanye-Stillwater Operating and financial results | Six months ended 30 June 2026 3
established. Hot commissioning of the concentrator commenced in April 2026, with continuous operating runs of up to 142 hours
demonstrating successful throughput performance. The current focus is on optimising spodumene concentrate grade and achieving
stable, consistent concentrate production. The project remains within its approved capital forecast, with cumulative construction
expenditure of €719m at 30 June 2026. In response to lithium-market volatility, the staged commissioning approach prioritises stable mining
and concentrator performance before refinery start-up, reducing integrated ramp-up risk and preserving capital flexibility. Jacques van
Rensburg has assumed acting responsibility for Keliber from 1 August 2026, following the departure of Hannu Hautala. Jacques'
engineering and operational leadership experience will support the next phase of commissioning, ramp-up and the production of
saleable lithium products.
Disciplined capital allocation and organic growth for sustainability
Our approach to sustainability is broader than just environmental and social performance. It starts with sustaining a safe, competitive and
financially resilient business, supported by operational excellence and disciplined investment in longer-life, higher-quality assets. This
strengthens our ability to manage resources responsibly, deliver returns and economic value, and create enduring shared value for our
shareholders, employees, communities and all other stakeholders.
The Board declared an interim dividend of R5.7bn (US$352m), equivalent to 201 SA cents per ordinary share or 49.73 US cents per ADR. This
represents 35% of normalised earnings, at the upper end of the Group’s dividend policy, and reflects an H1 2026 annualised interim
dividend yield* of 8.0%. Including the H2 2025 final dividend, the trailing 12-month dividend yield* is 6.6%, among the highest in our peer
group.
Record cash generation materially strengthened the balance sheet and expanded financial flexibility. Gross debt declined by 20% year-
on-year and 18% from 31 December 2025 to R32.1bn (US$2.0bn), while net debt more than halved to R9.7bn (US$593m), reducing net
debt to adjusted EBITDA to 0.18x.
The Group continued to unlock embedded value through disciplined investment in organic growth. This has primarily considered the SA
PGM brownfield project portfolio that benefits from existing infrastructure, established resources and extensive operating knowledge, all
reducing execution risk and avoiding acquisition premiums. SA PGM brownfield projects provide a possible pathway to sustain an
approximate 1.5Moz annual production profile, increase exposure to UG2 ore and support a greater contribution from mechanised
mining. Please refer to our SA Capital markets day presentation for more information about these projects, available at
www.sibanyestillwater.com/features/2026/capital-markets-day-2026-sa-operations/.
In addition, we are pleased that Burnstone and Mt Lyell have recently received a positive investment decision by the Board to proceed,
marking a further step in unlocking unrealised value from the Group’s organic project portfolio.
Burnstone supports the transition of the SA gold portfolio towards shallower, lower-risk and longer-life production. The project is expected
to produce approximately 130,000oz of gold annually at steady state, strengthening future reserve replacement and portfolio
sustainability. Refer to page 7 for more information.
Mt Lyell, the long-life, copper-gold project located near Queenstown, Tasmania, benefits from substantial existing infrastructure and is
expected to produce approximately 26kt of copper, 16koz of gold and 116koz of silver annually at steady state, with first production
targeted for early 2029. Approximately US$4.1m (R68m) of capital expenditure is planned for H2 2026, as the project moves into execution.
More information is available on page 10 of this report and in the H1 2026 results presentation available at www.sibanyestillwater.com/
news-investors/reports/.
Projects in the Group's portfolio will continue to be evaluated and sequenced according to returns, affordability, readiness and strategic
fit, balancing shareholder returns and balance-sheet strength with investment in future production and portfolio quality.
*Based on closing share prices on 28 August 2026. The 8.0% yield relates to the annualised H1 2026 interim dividend of 201 SA cents per share; the 6.6% trailing 12-month
yield includes the H1 2026 interim dividend and H2 2025 final dividend, totalling 332 SA cents per share. Peers: Valterra, Northam, Implats, Gold Fields and Harmony.
Navigating a volatile market environment
Commodity markets remained volatile during H1 2026, reflecting geopolitical tensions, evolving and uncertain trade policies, inflation risks
and downward revisions for global economic growth. Global growth expectations for 2026 were revised lower to 2.5%, with the US
economy remaining relatively resilient, while growth in China, emerging markets and the Eurozone were revised lower.
Precious metals markets consolidated following strong gains and record price levels during Q1 2026. Gold and platinum prices were
supported by strong investment demand and continued central bank gold purchases, although higher US interest rates and a stronger US
dollar created headwinds for precious metal prices. Market liquidity improved as gold and platinum ETF holdings declined during H1 2026,
resulting in platinum lease rates moderating. While weaker global automotive sales may weigh on palladium and rhodium demand,
platinum and palladium markets are expected to remain in deficit over the next 18 months, with rhodium remaining broadly in balance.
Medium-term PGM fundamentals continue to be supported by constrained primary supply, muted recovery in autocatalyst recycling and
policy underpins for catalysed vehicles.
Lithium prices remained well above 2025 levels despite increased volatility during the period. Prices rose sharply to near three-year highs
during Q2 2026, supported by robust battery electric vehicle (BEV) and battery energy storage system (BESS) demand, supply constraints
and customer restocking. Prices subsequently moderated following the resumption of concentrate exports from Zimbabwe and
announcements of new and returning supply from China, Australia and the Democratic Republic of Congo. While lithium prices are
expected to ease further during H2 2026 as supply increases, they are expected to remain above 2025 levels. Longer term, the market
outlook remains constructive, supported by sustained demand growth and the expectation that new mine supply will lag demand growth
from the end of the decade.
This volatile macro environment reinforces the relevance of our strategy. A simplified portfolio, clear operational accountability, flexible
and disciplined project sequencing and execution, and a stronger balance sheet are essential to maintaining agility and resilience
through commodity cycles while retaining flexibility to capture longer-term value.
The H1 2026 result demonstrates the earnings potential within our portfolio, but also confirms the importance of stable production, cost
discipline and capital allocation in converting supportive prices into sustainable cash flow and value.
Sibanye-Stillwater Operating and financial results | Six months ended 30 June 2026 4
Operating guidance for 2026*
Following a stable H1 2026 operational delivery, annual production, cost and capital guidance is maintained except where specifically
indicated below:
•The SA gold operation's cost guidance and the inclusion of the 2026 capital guidance for Burnstone and Mt Lyell
2026 Annual guidanceProductionAll-in sustaining costTotal capital
SA
operations
SA PGM operations
(4E PGMs)
1.65 - 1.75Moz
3,4
R26,500 - 27,500/4Eoz
(US$1,453 - 1,508/4Eoz)²
R8bn (US$439m)²
(incl. R1.79bn (US$98m) for
project capital)
SA gold operations
(excl. DRDGOLD)
13,700 - 14,700kg
(440 - 473koz)
R1,750k - 1,840k/kg
(US$2,984 - 3,138/oz)²
R3bn (US$164m)² (incl. R98m
(US$5m) for Burnstone
project capital)
SA gold operations
(incl. DRDGOLD)
7
19,100 - 19,750kg
(614 - 635koz)
R1,565k - R1,685k/kg
(US$2,670 - 2,870/oz)
2
R6.6bn (US$364m)
2
(incl. R3.1bn (US$172m) for
DRDGOLD project capital)
International
operations
US PGM operations
(2E mined)
280 - 300koz
US$1,520 - 1,580/2Eoz¹
Including Section 45X:
US$1,360 - 1,420/2Eoz
US$125m - US$135m (incl.
US$6m growth)
(R2.3bn - R2.5bn incl. R109m
growth)²
Recycling operations
(Columbus, PA and NC)
(PGM autocats, industrial
and e-waste precious metals
bearing waste)
Total 400 - 420koz
gold equivalent ounces
5
n/aUS$12.2m (R223m)²
Keliber lithium project
15k - 20k
tonnes of spodumene
concentrate
n/a
€180m - €190m
6
(R3.7bn –
R3.9bn)²
(incl. €90m (R1.8bn) for
project capital)
Century zinc operations
86.3k - 98.3k
tonnes (payable)
A$3,400 – 3,800/t (R42,160 –
47,120/t)² (US$2,311 - 2,583/
t)²
A$5m - A$5.5m
(US$3.4m – US$3.7m, R62m -
R68.2m)²
Mt Lyelln/an/a
A$11m
(US$7.5m, R136m)²
Source: Company forecasts, Note: Guidance does not take into account the impact of unplanned events
*As at 1 September 2026
1US PGM AISC is impacted by tax and royalties paid based on PGM prices, current guidance was based on spot 2E PGM prices of US$1,180/oz; By product credit assumptions of Rh US$4,800/oz
and gold US$2,500/oz
2Estimates are converted at an exchange rate of R18.24/US$, R20.43/€ and R12.40/A$
3SA PGM operations production guidance includes third party PoC and 50% attributable production from Mimosa
4SA PGM operations AISC excludes the purchase cost of third party PoC and Mimosa costs and capital (equity accounted)
5Gold equivalent ounce production calculated using the following metal pricing: Au US$2,506/oz, Ag US$38/oz, Pt US$1,150/oz, Pd US$1,050, Ir US$4,000/oz, Rh US$4,800/oz, Ru US$500/oz and Cu
US$4.4/lb
62026 guided capital includes construction phase start-up capital, sustaining cost and capitalised cost. The current production profile includes the Syväjärvi and Rapasaari open pit mining areas
7DRDGOLD included at 100%
RICHARD STEWART
CHIEF EXECUTIVE OFFICER
Sibanye-Stillwater Operating and financial results | Six months ended 30 June 2026 5
DETAILED SAFETY AND OPERATIONAL COMMENTARY
SAFE PRODUCTION — UNWAVERING FOCUS ON ELIMINATING FATALITIES
The safety and health of our workforce remain our foremost priority and the foundation of safe operational performance. Tragically, three
colleagues lost their lives in two operational incidents at the SA operations during H1 2026. We extend our deepest condolences to their
families, friends and colleagues. These losses reinforce our resolve to eliminate fatalities and serious harm.
In remembrance
Khanyile Magwebelele
•Winch operator, K3 shaft, SA PGM operations
•Fatally injured during night-shift cleaning on 16 April 2026
Thekololo Nkoe and Xolisa Mtshutshwana
• Kloof Masimthembe shaft, SA gold operations
• Lost their lives in a shaft-related incident on 3 May 2026
We honour their memory and remain resolute in our commitment to preventing fatalities and serious harm.
H1 2026 safety performance
The Group achieved its best-ever H1 performance for key injury-frequency measures. The serious injury frequency rate (SIFR) improved by
8% to 2.09, from 2.28 for H1 2025, while the total recordable injury frequency rate (TRIFR) improved by 8% to 3.60, from 3.90. High-potential
incidents reduced by 31%, while the fatality injury frequency rate (FIFR) (per one million hours worked) remained unchanged at 0.038.
Safety performance across the operations was mixed. The combined SA operations (SA PGM and SA gold) recorded a 4% improvement
in SIFR and a 5% improvement in TRIFR. The SA gold operations delivered a notable improvement, with SIFR decreasing by 31% and TRIFR
improving by 30%, together with a 32% improvement in the Lost day injury frequency rate (LDIFR). This was partly offset by a deterioration
at the SA PGM operations, where LDIFR increased by 15%, TRIFR by 14% and SIFR by 21% compared with H1 2025. The US operations
recorded a significant improvement, with TRIFR decreasing by 41%, SIFR improving by 89% and LDIFR improving by 56%. At the Keliber
project, TRIFR improved by 53%, with no serious injuries recorded during H1 2026. The Australian operations had two recordable injuries,
including one serious injury, compared with zero recordable injuries in H1 2025.
The safety culture uplift programme, launched across the SA operations in 2025, continues to progress. The programme is focused on
driving sustainable behavioural change through leadership mindset coaching and systems thinking, with implementation being extended
to Mine managers, Functional managers and key Plant managers. The programme is aligned with the Group’s broader leadership
development initiatives, iCARES values and existing culture programmes to ensure a consistent and integrated approach to safety
leadership.
Critical control management remains a core risk-reduction priority, supported by mature verification and auditing processes and
continued emphasis on the consistent and sustained execution of critical controls. A formal Group-wide process has also been
implemented to monitor the effective and sustainable implementation of lessons learned from prior high-potential incidents, ensuring that
corrective actions are applied, verified and maintained over time.
OPERATIONAL REVIEW
Southern Africa (SA) operations
SA PGM operations — Consistent delivery and cost discipline generates substantial margins, earnings and cash
The SA PGM operations delivered a strong H1 2026 result, with stable underground production and disciplined cost management
maximising the benefit of significantly stronger PGM prices. The AISC at the managed SA PGM operations remained below the lower end
of annual guidance, achieving a 44% AISC margin while adjusted EBITDA increased by 302% to R19.2 billion (US$1.2 billion) and notional
free cash flow increased to R10.4 billion (US$631 million).
Total 4E PGM production (including third party purchase of concentrate (PoC)) decreased by 1% to 831,307 4Eoz, primarily due to lower
surface production and lower attributable production from Mimosa, partly offset by higher total recovery grades, stable underground
production and higher purchase of concentrate (PoC) purchases. Total managed and attributable 4E PGM production, excluding third-
party PoC, decreased by 2% to 789,647 4Eoz. Underground production excluding Mimosa increased by 1%, supported by a 24% increase
(10,557 4Eoz) at Marikana K4, which offset lower Rustenburg production following planned plant maintenance. Approximately 15,000 4Eoz
remained on stockpile at period end for processing during H2 2026.
Surface production (excluding PoC) declined by 26% year-on-year to 40,034 4Eoz, primarily due to the transition to a new feed source at
Marikana, the depletion of surface reserves at Rustenburg and lower feed availability at Platinum Mile. Marikana surface production
(excluding PoC) decreased by 67%, reflecting lower grade and recoveries from the new feed source, while Rustenburg surface
production decreased by 14% as available surface reserves declined. Platinum Mile production also decreased by 14% after one of the
two feed streams from the E-Feed dam was stopped. A study is underway to determine the optimal treatment route for the remaining E-
Feed dam material.
Third-party purchase of concentrate increased by 16% to 41,660 4Eoz, partially offsetting the reduction in surface production and
supporting total SA PGM production.
AISC at the managed SA PGM operations, excluding third-party PoC, increased by 10% year-on-year to R26,252/4Eoz (US$1,600/4Eoz),
however remained below the lower end of annual guidance of R26,500/4Eoz.
The R2,360/4Eoz (US$301/4Eoz) increase in AISC unit cost was primarily driven by the R1.1 billion (US$66 million) increase in royalties linked to
the higher PGM basket price, together with annual inflationary increases in input costs and supply-chain pressures affecting consumables,
including fuel, lubricants and steel products. The royalty increase equated indicatively to approximately R1,383/4Eoz (US$85/4Eoz),
representing about 59% of the net AISC increase.
Inflationary cost pressures and the increase in royalties were partly offset by higher by-product credits, including improved chrome
margins, which reduced AISC (including PoC) by R7,480/4Eoz (US$456/4Eoz), a 33% improvement from the approximately R5,643/4Eoz
(US$307/4Eoz) benefit in H1 2025. The improvement was supported by stronger prices for iridium, ruthenium and base metals, together with
the continued contribution from chrome by-products.
Chrome production decreased by 18% year-on-year to 951kt, while chrome sales declined by 17% to 888kt. The reduction was
predominantly due to the cessation of the Marikana bulk tailings treatment (BTT) chrome plant in H2 2025, which accounted for
Sibanye-Stillwater Operating and financial results | Six months ended 30 June 2026 6
approximately 175kt, or 83%, of the 211kt year-on-year production decline. Excluding BTT, chrome production decreased by
approximately 36kt (3%), reflecting lower production from the Marikana, Rustenburg and Platinum Mile operations.
Chrome operating profit was R1.1 billion (US$65 million), 18% lower year-on-year, mainly on lower sales volumes following the planned
closure of the BTT plant in H2 2025 when remining of the ETD1 tailings storage facility was completed. Higher chrome prices and a 5%
increase in operating profit at the Rustenburg operations to R761 million (US$46 million) partly mitigated the impact of lower volumes,
offset by weaker contributions from Marikana and Platinum Mile.
Third-party PoC purchase cost increased by 85% to R2.0 billion (US$120 million), reflecting the 16% increase in purchased volumes and an
indicative 59% increase in purchase cost per ounce, primarily associated with stronger metal prices. Third-party PoC purchase costs are
excluded from the managed SA PGM AISC and related guidance.
AISC is expected to increase during H2 2026 in line with the annual guidance range, reflecting the planned increase in ore-reserve
development and sustaining capital. Total capital expenditure increased by 4% to R2.6 billion (US$161 million), with ore-reserve
development increasing by 8% to R1.2 billion (US$72 million) and sustaining capital increasing by 2% to R1.1 billion (US$69 million), partly
offset by a 3% decrease in project capital to R321 million (US$20 million). H1 2026 expenditure represented approximately 33% of full-year
capital guidance of R8.0 billion (US$439 million), indicating a higher planned capital run-rate during H2 2026. Sustaining investment was
directed towards operational flexibility, infrastructure refurbishment and approved extension initiatives, including the Thembelani
extension project and refurbishment work at the Precious metal refinery. Lower project capital reflected Marikana K4 moving closer to
steady-state production, while the Siphumelele UG2 project commenced its build-up at Rustenburg.
4E PGM sales (excluding Mimosa which is equity accounted) increased by 11% while the average PGM basket price increased by 67% to
R43,996/4Eoz (US$2,681/4Eoz), lifting SA PGM operations revenue by 73% to R43.1 billion (US$2.6 billion). Adjusted EBITDA increased by 302%
to R19.2 billion (US$1.2 billion), reflecting significant operational leverage from higher PGM commodity prices and sales volumes.
At Mimosa, attributable PGM production decreased by 7% to 55,002 4Eoz due to lower feed volumes and grade, which also affected
recoveries. AISC increased by 23% to US$1,465/4Eoz (R24,035/4Eoz), primarily due to inflationary increases in input costs, lower production
volumes, higher royalties associated with the stronger average PGM basket price and a 72% increase in sustaining capital to US$15 million
(R245 million). These adverse impacts were partly offset by by-product-credit movements. Concentrate sales increased by 32%, with the
comparative period affected by the suspension of exports from Zimbabwe during April and May 2025.
Please refer to page 16 and 18 for further operational results statistics.
SA gold operations — Higher gold prices and a growing surface contribution delivered record earnings and cash generation
The SA gold operations delivered record adjusted EBITDA and substantially higher cash generation, supported by the stronger gold price
and a growing surface contribution.
The SA gold operations (including DRDGOLD) delivered record adjusted EBITDA and substantially higher cash generation in H1 2026.
Adjusted EBITDA increased from R4.8 billion (US$260 million) to R9.0 billion (US$549 million), supported by higher gold sales and a
significantly higher average gold price received. Gold sold increased by 5% to 9,588kg (308,261oz), while the average gold price received
increased by 35% to R2,425,219/kg (US$4,597/oz). This more than offset a 2% decline in gold production to 9,134kg (293,665oz), with a 9%
(or 568kg, 18,262oz) decrease in underground production partly offset by 13% higher surface production.
Gold production decreased by 2% to 9,134kg (293,665oz), largely reflecting the planned rebasing of Kloof during H2 2025. Higher surface
production, driven by a 237kg (7,620oz) increase from DRDGOLD and increased third-party toll treatment at Cooke, partly offset this lower
underground production. Driefontein production remained broadly stable while Beatrix production was impacted by constrained access
to higher-grade areas following seismic damage to infrastructure and lower-than-expected plant recoveries.
AISC increased by 14% to R1,638,089/kg (US$3,105/oz). Higher gold sold year-on-year of 5% was offset by higher royalties associated with
higher gold average price (added 2% year-on-year), higher pumping costs at Driefontein (added 1% year-on-year), higher third-party
aggregate purchase costs at Cooke (added 2% year-on-year), inflationary cost increases and 19% lower production at Kloof.
Capital expenditure increased by 15% to R3.4 billion (US$206 million), primarily due to DRDGOLD where total capital expenditure
increased by 56% to R2.0 billion (US$123 million) as project capital expenditure on Vision 2028 infrastructure projects for Ergo and FWGR
progressed well in H1 2026 and as highlighted in the capital projects update presentation held by DRDGOLD management on 15 July
2026.
Please refer to page 16 and 18 for further operational results statistics.
The Burnstone project
In line with the Group’s strategy to unlock value from internal organic opportunities and its disciplined capital-allocation framework, the
Burnstone gold project received a positive investment decision by the Board following completion of a restated feasibility study and
internal assurance review. An initial R98 million budget for 2026 has been approved and project setup has commenced.
Burnstone is a high-value, near-term gold growth project located near Balfour in Mpumalanga, approximately 80km south-east of
Johannesburg. The project will mine the Kimberley Reef at an average depth of approximately 550 metres, with a maximum planned
depth of approximately 1,050 metres. Its shallower mining profile and substantial existing infrastructure support the transition of the SA gold
portfolio towards safer, lower cost, more efficient and longer-life production.
At 31 December 2025, Burnstone contained surface and underground gold Mineral Reserves of 2.7Moz and Mineral Resources of 8.9Moz.
The approved project is expected to establish future gold Mineral Reserves for the Group and partially offset depletion from the mature
conventional SA gold operations.
Key operating and economic metrics in 2026 real terms:
•Average annual steady-state gold production of approximately 130,000oz
•Average AISC of approximately R872,000/kg at steady state
•Net present value (NPV) of approximately R19.2 billion at a 10% discount rate
•Internal rate of return (IRR) of approximately 36.1%
•Project infrastructure capital of approximately R3.5 billion over six years
•Pre-production capital of approximately R2.5 billion through 2028
•Approved project budget of R98 million for 2026
•Build-up to approximately 2,500 employees during steady-state operations
Sibanye-Stillwater Operating and financial results | Six months ended 30 June 2026 7
The current development plan provides for pre-production capital during 2027 and 2028, with the processing plant expected to
commence operating in 2029. Gold production is expected to build progressively towards steady-state output rather than reaching full
capacity immediately.
Burnstone strengthens the Group’s precious-metals underpin through a high-return project already owned within the portfolio, avoiding an
acquisition premium. Existing infrastructure and extensive pre-development reduce the remaining execution requirements and capital
intensity relative to a comparable greenfield project. Burnstone will be advanced through disciplined execution, with capital deployed in
line with project readiness, affordability and the Group’s capital-allocation framework.