Unaudited interim results
for the six months ended 30 June 2026
Highlights
• Attributable gold-equivalent production of 1.267Moz is up 12%
year-on-year (YoY) and on track to meet the upper end of full-year
guidance
• Salares Norte production is up 173% as the mine reached
steady-state and is well positioned to outperform full-year guidance
• Adjusted free cash flow of US$2,225 million, is up 134%, driven by
higher sales volumes, a supportive gold price and Salares Norte's
transition to steady-state
• Headline earnings of US$1,855 million (208 US cents per share) are
up 81% YoY
• Total allocated to additional shareholder returns increased to a
cumulative US$1.25 billion, from US$750 million in February 2026;
US$300 million in share buy-backs completed to date
• Interim dividend of 1,625 SA cents per share declared, up 132% YoY
• Net debt/adjusted Earnings Before Interest, Taxes, Depreciation,
and Amortisation (EBITDA) of 0.06x, down from 0.37x as at the end
H1 2025, reflecting continued balance sheet strength
• Zero fatalities or serious injuries
Statement by Mike Fraser, CEO
Gold Fields delivered a strong first half as sales volumes rose by 18%
to 1.269Moz, supported by a higher average realised gold price of
US$4,678/oz, which resulted in adjusted free cash flow more than
doubling to US$2,225 million from US$925 million in H1 2025. This
gave us the platform to strengthen our balance sheet further, continue
investing in the long-term growth and resilience of our business, while
delivering upper quartile shareholder returns.
Strong production led by Salares Norte and Granny Smith
Operational momentum built in 2025 continued through the half, with
Group attributable production increasing 12% YoY to 1.267Moz, keeping
the Group firmly on track to deliver to the upper end of full-year
guidance. Salares Norte was a key contributor as the mine reached
steady-state production and delivered a 173% increase in goldequivalent production to 337koz. Granny Smith also delivered a strong
first half, with production up 10% on record haulage fleet availability and
autonomous truck performance. South Deep continued to demonstrate
incremental improvement in stope turnover and mining productivity
while Gruyere, Agnew and Tarkwa showed encouraging signs of
improvement in the second quarter as recovery plans gained traction.
Financial strength translating into shareholder value
Higher volumes and a stronger gold price drove a step-change
in financial performance. Group headline earnings increased 81% to
US$1,855 million and adjusted free cash flow before discretionary
investments rose by 101% to US$2,510 million (H1 2025: US$1,251 million),
as higher cash flows from operating activities were partially offset
by higher sustaining capital expenditure. The Group invested
US$609 million (US$496/oz) in sustaining capital to maintain the quality
and performance of its asset base.
Net debt to adjusted EBITDA fell to 0.06 times, from 0.37 times a year
earlier, reflecting the strength and resilience of the balance sheet.
This performance is underpinning higher returns to shareholders. 61%
of adjusted free cash flow was paid to shareholders as dividends in the
period and we stepped up our share buy-back programme, completing
share repurchases of US$300 million between March and July 2026.
Today, we are allocating a further US$500 million to additional
shareholder returns, lifting the additional returns programme
announced in November 2025 to a cumulative US$1.25 billion1 to be
delivered through a combination of special dividends and targeted
share buy-backs. Of the US$1.25 billion programme, US$253 million
was paid out as a special dividend in February 2026 while
US$300 million has been delivered through share buy-backs.
1Subject to applicable legal, regulatory and board approval requirements
Attributable production*
1.267Moz (+12%)
All-in sustaining costs*
US$1,893/oz (+13%)
Cash costs*
US$1,180 (+10%)
Adjusted free cash flow**
US$2,225m (+134%)
Interim dividend declared
1,625 SA cents per share (+133%)
Additional shareholder returns allocated US$500m
US$1.25 billion total in nine months
Share buy-back completed***
US$300m
Net debt/adjusted EBITDA*
0.06x (vs 0.37x H1 2025)
- Including Damang (discontinued operation)
** Net cash from operations less South Deep Black Economic Empowerment (BEE)
dividend, net capital expenditure, contributions to environmental trust funds and lease
payments
*** Share buy-back completed in July 2026
JOHANNESBURG, 25 August 2026: Today, Gold Fields Limited (NYSE
& JSE: GFI) announced profit attributable to owners of the parent for
the six months ended 30 June 2026 (H1 2026) of US$1,855 million
(US$2.07 per share), compared with profit of US$1,027 million
(US$1.15 per share) for the six months ended 30 June 2025 (H1 2025).
A gross interim dividend of 1,625 SA cents per share is payable on
14 September 2026.
In line with the Group's policy of paying out 35% of free cash flow
before discretionary investments, the Board today declares an interim
dividend of 1,625 SA cents per share, up 132% from the interim dividend
of 700 SA cents per share declared for H1 2025.
These results demonstrate the improving quality and resilience of our
business, and our ability to translate a supportive gold market into value
for shareholders through disciplined operational execution and capital
allocation.
Safety, strategy and the growth pipeline
Gold Fields recorded no fatalities or serious injuries across the Group in
H1 2026, continuing the positive trajectory of the Safety Improvement
Plan launched in 2024. We remain firmly focused on ensuring that
everyone leaves work safe and well each day.
The Group continued to advance its three-pillar strategy, including
progress towards Final Investment Decision (FID) at the Windfall Project
in Canada, where a key milestone was reached with the signing of an
Impact Benefit Agreement (IBA) with the Cree First Nation. The IBA
reflects our commitment to building strong partnerships with our host
communities while providing greater certainty for the project’s
development.
As we await approval of the Environmental Impact Assessment (EIA) for
Windfall, we are advancing project engineering, optimising execution
planning and progressing operational readiness which will significantly
de-risk the project ahead FID. Project capital is expected to be at
the upper end of the US$1.7 billion – US$1.9 billion (real 2025 terms)
guidance provided at our Capital Markets Day in November 2025. The
high-quality Windfall Project represents the next growth frontier for
Gold Fields and once developed, will become a cornerstone asset
within our portfolio. We will provide a further update once the EIA is
approved and FID is confirmed.
Mitigating external cost impacts
Group unit costs increased during the period, primarily due to external
factors – including higher gold-price linked royalties, stronger producercountry currencies, and higher input costs. All-in sustaining cost (AISC)
increased 13% to US$1,893/oz and total all-in costs (AIC) increased 9%
to US$2,125/oz, with these external factors partly offset by higher gold
sales and the cost-diluting contribution from Salares Norte. A sectorcompetitive underlying cash cost of US$1,180/oz reflects the quality and
resilience of the portfolio, supporting strong cash generation,
disciplined reinvestment in our assets and growth projects, and the
delivery of superior long-term returns to shareholders.
Transforming our business
We have commenced a Group-wide transformation programme aimed
at improving productivity, cost competitiveness and organisational
resilience. The programme combines value delivery initiatives across
mining, processing, asset management, supply chain and support
functions with the implementation of common systems and standard
processes within a consistent operating model across the Group.
Opportunities include improving fleet performance, increasing plant
throughput and recovery, optimising maintenance and inventory
practices, as well as simplifying support functions.
Following the commencement of baseline establishment, benchmarking
and opportunity identification, we continue to identify and prioritise
opportunities while progressively commencing implementation and
value delivery across selected workstreams. Through 2027 and
beyond, the programme will scale delivery across the Group, while
embedding the systems, processes and management disciplines
required to sustain performance improvements.
Delivery by operation
Gruyere delivered attributable production of 120koz in H1 2026, a
decrease of 17% YoY (H1 2025: 144koz), primarily reflecting lower
mining productivity, which resulted in production being below plan.
Performance improved during Q2 2026, with production increasing by
25% (13koz) quarter-on-quarter (QoQ) as recovery initiatives began to
gain traction. Improvement actions include upgraded pit dewatering
infrastructure, the deployment of two new 600t excavators and
reduced contract turnover rate which is driving improved operational
momentum. While the benefits are expected to build progressively over
time, the recovery is constrained by interface challenges between
stages 4 and 5 of the pit. The mine is expecting to deliver target run
rates by the end of Q3 2026, however remains at risk of not recovering
the H1 2026 shortfall.
Granny Smith delivered a strong first-half performance, producing
147koz in H1 2026 – 10% higher YoY (H1 2025: 134koz). The
improvement was driven by higher haulage fleet availability, record
autonomous truck performance and the successful re-establishment of
mining in the Z135 East area following ground support upgrades.
Disciplined execution of the development plan into the priority
Z135 West mining areas further strengthened operational performance
and supports the asset’s production outlook.
2
GOLD FIELDS H1 Results 2026
St Ives produced 170koz gold-equivalent in H1 2026 (H1 2025: 185koz),
8% lower than H1 2025 but 3% higher in Q2 2026 compared to
Q1 2026. Production was constrained by ore supply challenges at the
Invincible underground mine following an approximately seven-month
restriction on the primary ventilation system due to salt build up in a
vent raise, which limited development and reduced broken-stock
availability. Production was further impacted by the decision to bring
the mill reline shutdown forward into Q2 2026. These impacts were
offset by strong production from the open pits and consistent
performance from Hamlet. Despite the lower production in H1 2026, St
Ives is expected to deliver on planned production profile for the full
year with a stronger H2 2026 expected.
Agnew produced 103koz in H1 2026, 15% lower than H1 2025 (122koz).
Performance improved during Q2 2026, with production increasing by
12koz QoQ as operational stability improved. This is a result of the
rebuilding of the Waroonga underground production profile following
seismic rehabilitation in Q1 2026, together with continued
improvements in paste-fill reliability and the disciplined execution of the
recovery plan.
Tarkwa produced 192koz in H1 2026, 18% lower than H1 2025 (233koz),
reflecting lower mill feed grades, grade reconciliation issues in a
section of the underlap pit and the impact of adverse weather on load,
haul and drilling activities. Performance improved during Q2 2026 as
rainfall eased, supporting better mining conditions and continued
progress of the recovery plan. Our focus remains on improving drill rig
reliability and productivity, increasing blasted ore stocks and bringing
additional drilling capacity online to strengthen ore availability in
H2 2026. While the recovery is gaining traction, Tarkwa is at risk of not
recovering the H1 2026 shortfall and therefore not meeting full- year
guidance.
South Deep delivered a solid first-half performance, with attributable
gold production of 151koz in H1 2026, down 1% from H1 2025 (153koz).
Performance improved during Q2 2026 and in line with the plan,
supported by stronger destress mining, improved development rates,
stable grades, improved long-hole stoping, and enhancements to water
management, ventilation and backfill infrastructure. A five-year wage
agreement was signed post-period end which provides a solid base
for stability.
Salares Norte delivered an outstanding first-half performance, with
production increasing 173% to 337koz gold-equivalent (H1 2025: 124koz
gold-equivalent) as the operation successfully completed its ramp-up
to steady-state production. This was supported by strong plant
availability through the onset of winter, resulting in higher-than-planned
throughput and better-than-budgeted reconciled head grades. The
operation remains well positioned to outperform its annual guidance.
Having a positive impact on our communities and the
environment
Our ability to create long-term value depends on the success of our
host communities and responsible environmental stewardship. Guided
by our 2035 commitments, we continued to invest in programmes and
partnerships that create shared value, strengthen local communities
and support positive social and environmental outcomes.
Host community value creation
During H1 2026, the Group delivered approximately US$4.96 billion in
stakeholder value, including US$941 million to host communities,
through employment, procurement, taxes, royalties and community
investment, reflecting our continued contribution to local economies.
Our Group Legacy Programme continues to advance our commitment
to creating enduring value beyond mining. During H1 2026, we
progressed the development and implementation of multi-year
programmes across Australia, South Africa, Ghana, Chile and Peru.
Distributions from the Thusano Trust continue to progress, with 88% of
the total proceeds of US$440.5 million (R7.37 billion) paid to
beneficiaries in South Africa.
Mitigating climate change
Renewable electricity continued to support our decarbonisation efforts,
contributing 181 gigawatt-hours (GWh), which comprised 17.4% of Group
electricity consumption in H1 2026. Agnew remained the Group’s
leading renewable energy operation, with renewable electricity
accounting for 43% of its power supply. Scope 1 and 2 emissions were
4% lower than in H1 2025, with cumulative emissions abatement
from renewable electricity in 2025 forecast to reach 101ktCO₂e from a
2022 baseline.
Construction of the St Ives Renewables Project is substantially
complete, with all seven wind turbines, powerline infrastructure and
substation works constructed and ready for connection. Commissioning
has been delayed to H2 2026 pending completion of the wind turbine
verification requirements and finalisation of grid connection and
operating agreements.
Preventing serious environmental harm
There is a continued focus on preventing serious environmental harm
through strong incident prevention, permitting discipline, tailings
oversight and improved environmental risk management. During
Q2 2026, we recorded nine level 2 environmental incidents and no
significant tailings incidents. Environmental standard gap assessments
and site-specific implementation roadmaps continued to strengthen
critical control management and second-line assurance.
Responsible tailings management is paramount and the Group
continued to maintain conformance with the Global Industry Standard
on Tailings Management (GISTM).
During H1 2026, we advanced a portfolio of initiatives to continually
improve tailings performance, unlock future storage capacity and
enhance operational flexibility. Key milestones included a successful
mud farming trial at Cerro Corona, which will accelerate consolidation
of the upper tailings layers and increase tailings density, improving
storage efficiency and unlock additional capacity within the existing
facility. Additionally, we are developing a commingling trial at Tarkwa,
which involves blending tailings with waste rock to reduce footprint,
capital and technical risk and a filtration plant design for Windfall.
Update on the renewal of the Tarkwa mining leases
Following our early submission of an application for the renewal of the
Tarkwa mining leases in November 2025, at the request of the
Government of Ghana in April 2025, Gold Fields continued to engage
with the Government of Ghana to progress the Tarkwa lease
renewals, which expire in April 2027. In July 2026, we submitted a
comprehensive commercial proposal to the Government of Ghana to
support the renewal of the leases and long-term sustainability of
Tarkwa. Our proposal is underpinned by a significant programme of
investment over the Tarkwa life of mine, while also seeking to deepen
our partnership with Ghana through increased value-sharing that
delivers meaningful national benefit, strengthens the country’s fiscal
position and drives long-term social development. Components of our
proposal include expanded community investment, increasing support
to local businesses, further investment in local skills development and
enhanced long-term socio-economic value creation.
We are still awaiting a formal response to our proposal from the
Government of Ghana, and, at this stage, have no confirmed timeframe
for this response or for the conclusion of our negotiations regarding the
lease renewals. As such, there remains uncertainty as to the timing,
outcome, and terms of any negotiated agreement to renew the Tarkwa
leases. An adverse outcome of the renewal process would have a
material and adverse impact on Gold Fields. We are considering all
options available to us with respect to the renewal of the Tarkwa leases
and our Development Agreement (DA), including pursuing our legal
rights under the leases, DA, and at law, if required.
We remain committed to Tarkwa and our long-term contribution in
Ghana, where we have operated for over 30 years. Subject to the
outcome of the renewal process, we believe that Gold Fields remains
well positioned to continue investing in and operating the Tarkwa mine,
including exploring opportunities to extend the mine life beyond the
current known reserves, creating lasting value for both Ghana and
Gold Fields.
Growing the quality of our portfolio
Progressing the Windfall Project
Windfall is one of Canada's highest-grade development-stage gold
deposits. With considerable growth prospects along strike and
down plunge, the project is expected to provide a long-life, low-cost
production platform. While Windfall is the anchor asset, opportunity
extends well beyond the current mine plan. Having secured a highly
prospective land package across the district, Gold Fields is accelerating
exploration across a target-rich pipeline with the objective of
progressively expanding the scale, scope and longevity of Windfall
through new discoveries and the addition of high-margin ounces that
can leverage the infrastructure already being developed.
3
GOLD FIELDS H1 Results 2026
Following the update provided in the Trading Statement, issued on
11 August 2026, we continue to await a recommendation for the
issuance of the EIA from the Environmental and Social Impact Review
Committee (COMEX) of Québec. Based on engagements with both the
Government of Québec and the Cree First Nation Government, EIA
approval is now expected in H2 2026, after which it is expected that
the project will progress to FID. During this period, the focus remains on
derisking the project ahead of final approval. We are adjusting on-site
activities and the project development schedule to optimise costs while
maintaining flexibility to progress FID and development after the
EIA approval is received.
Gold Fields will provide a further update once the EIA is approved and
FID is confirmed, together with an updated project execution schedule
and capital estimate. Windfall is a world-class project with robust
economics. Once developed, we expect it to become a cornerstone
asset within the Gold Fields portfolio.
Brownfields
Brownfields exploration remains a core pillar of Gold Fields' capital
allocation strategy, supporting reserve replacement, mine-life extension
and capital-efficient growth from existing infrastructure. During
H1 2026, the Group invested US$56 million in brownfields exploration,
completing 148km of drilling across its operations. Key achievements
include the resumption of surface drilling at South Deep to infill the
South of Wrench (SOW) area, where the first hole has intersected the
orebody timeously and as expected, with additional rigs planned to
accelerate the programme. At St Ives, strong drilling results were
returned from Santa Ana, Achilles and the Invincible complex,
supporting future resource growth and production flexibility.
Further improving the quality of our portfolio
During H1 2026, we continued to improve the quality of our portfolio
by disposing of non-core investments, generating approximately
US$182 million in cash proceeds. This included the completing of
the previously announced US$167 million sale of a portfolio of
royalties and related interests to OR Royalties. The remaining proceeds
were generated through the disposal of selected non-core listed
investments, reflecting our disciplined approach to portfolio
management and capital allocation.
Greenfields exploration continued to progress during H1 2026, with
new drilling campaigns advancing, the exploration portfolio expanding
and a pipeline of opportunities being developed to support long-term
growth beyond 2035.
Our strategic investment in Founders Metals continues to provide
exposure to the emerging Antino gold district in Suriname, where
exploration success and district consolidation are strengthening the
project’s long-term potential. Following the period end, we agreed to
invest C$77 million to increase our interest in Founder Metals to
approximately 19.9%, supporting Founders’ consolidation of 100%
ownership of Antino and continued exploration across its highly
prospective 102,360-hectare land package.
In Australia, we expanded our portfolio through the Everleigh Joint
Venture with Iceni Gold, securing a staged earn-in to a prospective
greenfields project in Western Australia with district-scale potential. We
also established a 5.33% strategic equity interest in Augustus Minerals,
providing exposure to two drill-ready exploration opportunities. Across
the former Gold Road exploration portfolio, we continued to rationalise
non-core assets, unlock value through strategic transactions and
advance priority projects toward drilling.
During the period, we commenced drilling at the Wayra Project in
southern Peru while drilling continued at the Villa Tati Project in Chile.
In Australia, drilling progressed adjacent to Newmont's Cadia Valley
operations, with further drilling planned at the East Lachlan and
Edinburgh Park joint ventures during the second half of the year.
In Canada, the C$24.5 million regional exploration programme at
Windfall continued. Land access, permitting and field activities
progressed during the period, positioning the team for the next phase
of drilling across Gold Fields' 2,500km² land package.
Board and Executive Committee appointments
John MacKenzie was appointed Non-executive Chair of the Board
following the Annual General Meeting on 21 May 2026. John brings
extensive international executive and non-executive leadership
experience across the natural resources sector.
We further strengthened our executive leadership team with the
appointment of Francois Hardy as Chief Technical Officer, effective
1 August 2026. Francois has more than 30 years of international mining
experience across operations, technical services and project
development, with a strong track record of delivering safe and reliable,
operational performance.
We announce the appointment of Andiswa Ndoni as interim company
secretary of the Company. Andiswa will take over from Anré Weststrate
with effect from 1 September 2026, as part of ongoing restructuring of
the Group governance, compliance, and ethics functions. Shareholders
will be advised as to the permanent appointment of the company
secretary in due course.
Andiswa is an admitted attorney (LLB) with over 31 years of experience
in the legal profession, spanning corporate and commercial law as well
as corporate governance and company secretarial roles.
The Board is satisfied that Andiswa has the requisite knowledge and
experience to fulfil the role of interim company secretary of the
Company and confirms that the relevant fit and proper assessment has
been conducted.
We would like to thank Anré for her contribution to the Group during
her term of office and wish her well.
2026 guidance
Gold Fields enters the second half of 2026 with strong operational and
financial momentum, a materially strengthened balance sheet, and
continued visibility on our growth pipeline, including advancing Windfall
towards FID and ongoing engagement with the Government of Ghana
on the Tarkwa lease renewal.
We remain on track to meet the production and cost guidance.
Attributable gold-equivalent production for 2026 is expected to be at
the upper end of the guidance range of 2.4 and 2.6Moz. Guidance is
supported by continued outperformance expected at Salares Norte in
H2 2026. Recovery plans are being implemented at Gruyere and
Tarkwa, however, despite improved performance in Q2 2026 and
expected improvements in H2 2026, both assets remain at risk of
delivering below their full-year guidance.
In line with the guidance provided in February 2026, AISC and AIC are
expected to be between US$1,800 and US$2,000/oz, and US$2,075
and US$2,300/oz respectively. AIC is expected to be towards the lower
end of the range, as Group capital expenditure is now expected to
be between US$1,600 million and US$1,800 million, compared to prior
guidance of US$1,900 million to US$2,100 million. The reduction
primarily reflects reclassifying of certain Windfall expenditure from
capital expenditure to exploration expense. Accordingly, while capital
expenditure is expected to decrease, a portion of the reduction will be
offset by higher growth exploration expenditure. Sustaining capital
expenditure guidance remains unchanged at US$1,300 million to
US$1,400 million.
We remain focused on translating the momentum gained into
sustained, disciplined value creation for shareholders.
The above guidance is subject to the forward-looking statements on
page 58 of this announcement.
Mike Fraser
Chief Executive Officer
25 August 2026
4
GOLD FIELDS H1 Results 2026
Key statistics
United States Dollar
Quarter
June 2026
Figures in millions unless otherwise stated
March 2026
Six months ended
June 2025
June 2026
June 2025
1,136
Gold-equivalent produced – attributable
oz (000)
634
633
585
1,267
Gold-equivalent produced – managed
oz (000)
650
649
602
1,299
1,171
Gold-equivalent sold – managed
oz (000)
643
649
559
1,292
1,126
Tonnes milled/treated
000
10,631
11,650
10,734
22,281
20,893
Revenue
US$/oz
4,505
4,855
3,281
4,681
3,089
AISC#
US$/oz
1,957
1,829
1,739
1,893
1,682
Total AIC#
US$/oz
2,204
2,046
2,054
2,125
1,957
Net debt
US$m
437
1,304
1,487
437
1,487
Net debt (excluding lease liabilities)
US$m
(22)
824
1,055
(22)
1,055
0.06
0.19
0.37
0.06
0.37
Net debt to adjusted EBITDA ratio
Adjusted free cash flow
US$m
2,225.3
951.7
Profit attributable to owners of the parent
US$m
1,854.6
1,026.7
Profit per share attributable to owners of
the parent
US c.p.s.
207
115
Headline earnings attributable to owners
of the parent
US$m
1,854.7
1,027.3
Headline earnings per share attributable to
owners of the parent
US c.p.s.
208
115
Refer to pages 38 - 39
At 30 June 2026, all operations are wholly owned except for Tarkwa and Damang (up to 18 April 2026) in Ghana (90.0%), South Deep in South Africa (93.10%), Cerro Corona in Peru (99.5%)
Gold produced and sold throughout this report includes copper gold equivalents of approximately 2% of Group production
AISC and total AIC in the key statistics table include all Gold Fields operations, projects and offices
The table above represents continuing and discontinued operations.
Figures may not add as they are rounded independently
5
GOLD FIELDS H1 Results 2026
All-in cost reconciliation
United States Dollar
Quarter
Figures in millions unless otherwise stated
Six months ended
June 2026
March 2026
June 2025
June 2026
June 2025
Total AIC for mining operations
US$/oz
2,055
1,917
1,936
1,986
1,844
Windfall
US$/oz
118
110
91
114
86
Corporate and other
US$/oz
31
19
27
25
27
Total AIC
US$/oz
2,204
2,046
2,054
2,125
1,957
Currencies and metal prices
United States Dollar
Quarter
Six months ended
June 2026
March 2026
June 2025
June 2026
June 2025
US$1 - ZAR
16.49
16.34
18.29
16.41
18.39
A$ - US$
0.71
0.70
0.64
0.70
0.63
US$ - C$
0.72
0.73
0.72
0.73
0.71
Gold price (US$/oz)
4,505
4,855
3,281
4,681
3,089
Copper price (US$/tonne)
13.324
12,852
9,519
13.088
9,432
73
83
34
78
33
Figures in millions unless otherwise stated
Silver price (US$/oz)
Stock data for the six months ended June 2026
Number of shares in issue, net of treasury shares
NYSE – (GFI)
– at 30 June 2026
890,896,534
Range – Six months
US$31.88– US$61.51
– average for six months
893,786,404
Average Volume – Six months
3,489,271 shares/day
Free float
100 per cent
JSE Limited – (GFI)
ADR ratio
1:1
Range – Six months
ZAR526.50- ZAR936.10
Bloomberg/Reuters
GFISJ/GFLJ.J
Average volume – Six months
2,491,663 shares/day
Pro forma financial information
The interim results contain certain non-IFRS financial measures in respect of the Group’s financial performance, the statement of financial position and
cash flows presented in order to provide users with relevant information and measures used by the Group to assess performance. Non-IFRS financial
measures are financial measures other than those defined or specified under all relevant accounting standards. To the extent that these measures are
not extracted from the segment disclosure included in the unaudited consolidated interim financial statements of Gold Fields for the six months ended
30 June 2026, these measures constitute pro forma financial information in terms of the JSE Limited Listings Requirements and are the responsibility of
the Group’s Board of Directors. They are presented for illustrative purposes only and due to their nature, may not fairly present Gold Fields’ financial
position, changes in equity, results of operations or cash flows. In addition, these measures may not be comparable to similarly titled measures used by
other companies.
The key non-IFRS measures used include net debt (including and excluding lease liabilities), adjusted earnings before interest, taxation, depreciation
and amortisation (EBITDA), sustaining capital expenditure, non-sustaining capital expenditure, adjusted free cash flow, adjusted free cash flow from
operations, adjusted free cash flow before discretionary growth investments, all-in sustaining and total AIC. The applicable criteria on the basis of which
this information has been prepared are set out in the notes accompanying the announcement.
This pro forma financial information has not been reviewed or reported on by the Group’s auditors, being PricewaterhouseCoopers Inc.
6
GOLD FIELDS H1 Results 2026
H1 2026 operating performance
Income statement
Continuing operations
Revenue
Revenue increased by 79% from US$3,318m for the six months ended
30 June 2025 to US$5,937m for the six months ended 30 June 2026
due to the 18% higher gold-equivalent ounces sold and the 51% higher
gold price received.
Gold-equivalent ounces sold increased by 18% from 1.074Moz to
1.269Moz. Refer to the Review of Operations for a breakdown
per asset.
The average US Dollar gold price achieved by the Group increased by
51% from US$3,089/eq oz for the six months ended 30 June 2025 to
US$4,678/eq oz for the six months ended 30 June 2026. The average
Australian/US Dollar exchange rate strengthened by 11% from A$1.00 =
US$0.63 for the six months ended 30 June 2025 to A$1.00 = US$0.70
for the six months ended 30 June 2026. The average Canadian/US
Dollar exchange rate strengthened by 3% from C$1.00 = US$0.71 for
the six months ended 30 June 2025 to C$1.00 = US$0.73 for the six
months ended 30 June 2026. The average US Dollar/Rand exchange
rate strengthened by 11% from R18.39 for the six months ended
30 June 2025 to R16.41 for the six months ended 30 June 2026.
Cost of sales before amortisation and depreciation
Cost of sales before amortisation and depreciation increased by 52%
from US$1,108m for the six months ended 30 June 2025 to US$1,679m
for the six months ended 30 June 2026 mainly due to the increase in
production at Salares Norte, inflationary pressures on commodity inputs
and employee and contractor costs and a charge to GIP of US$69m in
2026 as opposed to a credit of US$58m in 2025.
Amortisation and depreciation
Amortisation and depreciation for the Group increased by 74% from
US$361m for the six months ended 30 June 2025 to US$629m for the
six months ended 30 June 2026 mainly due to Salares Norte achieving
commercial levels of production in 2025 and amortising in full for six
months in 2026.
Investment income
Investment income increased by 79% from US$19m for the six
months ended 30 June 2025 to US$34m for the six months ended
30 June 2026 due to higher cash and cash equivalents.
Finance expense
Finance expense for the Group increased by 162% from US$42m for
the six months ended 30 June 2025 to US$110m for the six months
ended 30 June 2026 due to higher borrowings and cessation of
capitalisation of interest for Salares Norte during the six months ended
30 June 2026. Interest expense on borrowings of US$79m, interest on
lease liability of US$16m and rehabilitation interest of US$15m for the
six months ended 30 June 2026 compared with interest expense on
borrowings of US$69m, interest on lease liability of US$12m and
rehabilitation interest of US$13m, partially offset by interest capitalised
of US$53m for the six months ended 30 June 2025
Share of results of equity-accounted investees after taxation
The share of results of equity-accounted investees’ losses after taxation
of US$1m for the six months ended 30 June 2025 compared to a profit
of US$1m for the six months ended 30 June 2026, both relating to
equity-accounted results from Lunnon.
(Loss)/gain on foreign exchange
The gain of US$34m for the six months ended 30 June 2025
compared to a loss of US$40m for the six months ended 30 June 2026
and both related to the conversion of offshore cash holdings and
borrowings into their functional currencies.
Share-based payments
Share-based payments for the Group increased by 122% from
US$9m for the six months ended 30 June 2025 to US$20m for the six
months ended 30 June 2026 mainly due to higher forecast vesting
percentages of share-based payments.
Long-term incentive plan
The long-term incentive plan expense decreased by 60% from US$15m
for the six months ended 30 June 2025 to US$6m for the six months
ended 30 June 2026 due to the phasing out of the scheme.
7
GOLD FIELDS H1 Results 2026
Other costs, net
Other costs for the Group decreased by 69% from US$16m for the six
months ended 30 June 2025 to US$5m for the six months ended
30 June 2026.
Exploration expense
Exploration expense increased by 35% from US$133m for the six
months ended 30 June 2025 to US$179m for the six months ended
30 June 2026 due to higher spend at the Windfall project in Canada.
Non-recurring items
Non-recurring items increased from US$5m for the six months ended
30 June 2025 to US$60m for the six months ended 30 June 2026.
Royalties
Government royalties for the Group increased by 56% from US$89m for
the six months ended 30 June 2025 to US$139m for the six months
ended 30 June 2026 in line with the higher revenue.
Mining and income taxation
The taxation charge for the Group increased by 110% from US$565m
for the six months ended 30 June 2025 to US$1,184m for the six
months ended 30 June 2026 in line with the higher profit before
taxation.
Profit for the period
Profit for the period increased by 87% from US$1,028m for the six
months ended 30 June 2025 to US$1,921m for the six months ended
30 June 2026.
Discontinued operations
(Loss)/profit from discontinued operations
The Damang mine was formally transferred to the Government of
Ghana on 18 April 2026 following the expiry of the 12-month mining
lease granted to Gold Fields in April 2025. For accounting purposes,
Damang is considered an abandoned asset and has been classified as
a discontinued operation.
Profit from discontinued operations of US$29m for the six months
ended 30 June 2025 compared to a loss of US$19m for the six months
ended 30 June 2026.
Statement of cash flow
Cash flow from operating activities
Cash inflow from operating activities increased by 37% from US$1,306m
for the six months ended 30 June 2025 to US$1,793m for the six
months ended 30 June 2026. The increase was mainly due to a higher
profit before royalties and taxation partially offset by higher taxation
and royalties paid.
Dividends paid increased by 239% from US$376m for the six months
ended 30 June 2025 to US$1,274m for the six months ended 30 June
2026. The dividend paid of US$1,274m for the six months ended
30 June 2026 comprised dividends paid to owners of the parent of
US$1,234m related to the 2025 final dividend and dividends paid to
non-controlling interest holders of US$40m. The dividend paid of
US$376m for the six months ended 30 June 2025 comprised dividends
paid to owners of the parent of US$346m related to the 2024 final
dividend, dividends paid to non-controlling interest holders of US$29m
and South Deep BEE dividend of US$1m.
Cash flow from investing activities
Cash outflow from investing activities decreased by 11% from US$656m
for the six months ended 30 June 2025 to US$586m for the six months
ended 30 June 2026.
Capital expenditure
Capital expenditure increased by 6% from US$667m for the six
months ended 30 June 2025 to US$709m for the six months ended
30 June 2026. The capital expenditure of US$709m for the six months
ended 30 June 2026 comprised of sustaining capital expenditure of
US$609m (H1 2025:US$505m) and non-sustaining capital expenditure
of US$100m (H1 2025: US$162m). The increase in sustaining capital is
mainly due to higher spend at Gruyere and Tarkwa. The decrease in
non-sustaining capital is due to a lower spend at Salares Norte
following completion of project-related construction activities.
Purchase of investments
Purchase of investments decreased by 13% from US$32m for the six
months ended 30 June 2025 to US$36m for the six months ended
30 June 2026. The purchase of US$36m for the six months ended
30 June 2026 comprised purchases of bonds for the insurance captive
of US$28m as well as a purchase of Founders Metals shares of US$8m.
The purchase of US$32m for the six months ended 30 June 2025
comprised purchases of bonds for the insurance captive of US$26m as
well as purchases of Vior Inc. shares of US$4m.
Proceeds on disposal of investments
Proceeds on disposal of investments decreased by 20% from US$49m
in the six months ended 30 June 2025 to US$39m in the six months
ended 30 June 2026. The proceeds of US$39m received in 2026
comprised proceeds from the disposal of Osisko metals of US$14m
and insurance captive bonds of US$25m. The proceeds of US$49m
received in 2025 comprised proceeds from the disposal of O3 Mining
of US$21m and insurance captive bonds of US$28m.
Cash flow from financing activities
Net cash outflow from financing activities increased by 59% from
US$491m for the six months ended 30 June 2025 to US$780m for the
six months ended 30 June 2026. The cash outflow of US$780m for the
six months ended 30 June 2026 related to repayments on offshore
loans of US$659m, buy back of shares of US$120m and payment of
lease liabilities of US$66m partially offset by draw-downs on offshore
loans of US$65m. The cash outflow of US$491m for the six months
ended 30 June 2025 related to repayments on offshore loans of
US$1,284m, purchase of treasury shares of US$10m and payment of
lease liabilities of US$51m partially offset by draw-downs on offshore
loans of US$853m.
Net cash generated
Net cash generated for the Group increased by 169% from US$159m for
the six months ended 30 June 2025 to US$427m for the six months
ended 30 June 2026. After accounting for a negative translation
adjustment of US$9m on non-US Dollar cash balances, the cash inflow
for the six months ended 30 June 2025 was US$418m. The cash
balance at 30 June 2026 of US$2,197m compared with US$1,067m at
30 June 2025.
Adjusted free cash flow
Adjusted free cash increased by 134% from US$952m for the six
months ended 30 June 2025 to US$2,225m for the six months ended
30 June 2026 due to higher cash flows from operating activities
partially offset by higher capital expenditure.
Adjusted free cash flow is calculated as follows:
Six months ended
US$’m
June 2026
June 2025
Net cash from operations
3,107.8
1,625.8
South Deep BEE dividends
(0.4)
(0.7)
Capital expenditure – additions
(709.1)
(667.4)
Capital expenditure – working capital
—
(4.1)
Proceeds on disposal of property, plant
and equipment
0.2
1.5
Net debt/adjusted EBITDA
The net debt/adjusted EBITDA ratio of 0.06 at 30 June 2026 compared
with 0.37 at 30 June 2025. The net debt/adjusted EBITDA ratio of 0.06
at 30 June 2026 is based on net debt of US$437m and adjusted
EBITDA of US$7,604m.
The net debt/adjusted EBITDA ratio of 0.37 at 30 June 2025 is based
on net debt of US$1,487m and adjusted EBITDA of US$3,977m.
Adjusted EBITDA
Adjusted EBITDA for calculating net debt/adjusted EBITDA is based on
the profit for the 12 months ended 30 June 2026 and 30 June 2025
and is determined as follows in US$ million:
US$’m
June 2026
June 2025
Revenue
11,320
6,555
Cost of sales before amortisation
and depreciation
(3,328)
(2,340)
(343)
(200)
Exploration and project costs
Other costs*
(45)
(38)
7,604
3,977
- Other costs include other non-mine-based costs
Adjusted EBITDA is defined by the Group as profit or loss for the year adjusted for
interest, taxation, amortisation and depreciation and certain other non-operating costs
All-in sustaining and total all-in cost
Year-on-year
The Group AISC (including Damang) increased by 13% from US$1,682/oz
for the six months ended 30 June 2025 to US$1,893/oz for the six
months ended 30 June 2026 mainly due to higher cost of sales before
amortisation and depreciation, higher sustaining capital expenditure
and higher royalties, partially offset by higher gold sold and higher byproduct credits to cost. The higher sustaining capital expenditure was
mainly at the Australian operations and Tarkwa, partially offset by lower
sustaining capital expenditure at Salares Norte.
Total AIC (including Damang) increased by 9% from US$1,957oz for the
six months ended 30 June 2025 to US$2,125oz for the six months
ended 30 June 2026 mainly due to the same reasons as above for
AISC, partially offset by lower non-sustaining capital expenditure.
Cash costs
The Group cash costs (including Damang) increased by 10% from
US$1,068/oz for the six months ended 30 June 2025 to US$1,180/oz for
the six months ended 30 June 2026 mainly due to higher cost of sales
before gold inventory change and amortisation and depreciation and
higher royalties, partially offset by higher by-product credits.
Six months ended
US$’m
June 2026 June 2025
Cost of sales
2,307.6
1,468.9
Amortisation and depreciation
(629.0)
(361.3)
Gold inventory change
(69.3)
58.1
(326.6)
(120.6)
(36.0)
Contributions to environmental trust funds
(10.8)
(4.4)
By-product credits*
Contributions to secured cash deposits
(18.7)
(11.9)
Corporate costs*
(67.1)
Payment of lease liability
(66.2)
(47.5)
Royalties
139.3
89.1
Cash utilised/generated by discontinued
operation
(77.5)
60.4
Cash cost for Damang*
90.1
62.8
2,225.3
951.7
Adjusted free cash flow
Adjusted free cash flow is calculated as cash flow from operating activities less net
capital expenditure, environmental payments, lease payments and redemption of
Asanko preference shares.
Statement of financial position
Net debt decreased by 71% from US$1,487m at 30 June 2025 to
US$437m at 30 June 2026.
Net debt excluding lease liabilities of US$1,055m at 30 June 2025
compared to net cash of US$22m at 30 June 2026.
Net debt is defined by the Group as total borrowings and lease
liabilities less cash and cash equivalents.
8
GOLD FIELDS H1 Results 2026
Cash costs
1,445.0
1,161.0
Gold only ounces sold - (000’ounces)
1,224.7
1,086.9
1,180
1,068
Cash costs per ounce of gold sold - US$/oz
*Based on information underlying the condensed consolidated financial statements of
Gold Fields Limited for the periods ended 30 June 2026 and 2025.
Review of operations
Six months ended June 2026 compared with six months ended
June 2025
Figures may not add as they are rounded independently.
Gruyere
June
2026
June
2025
%
Variance
Ore mined
000
tonnes
3,315
4,734
(30)
Waste (Capital)
000
tonnes
19,439
24,047
(19)
Waste (Operational)
000
tonnes
1,395
5,700
(76)
Total waste mined
000
tonnes
20,834
29,747
(30)
Total tonnes mined
000
tonnes
24,149
34,481
(30)
Grade mined
g/t
0.93
1.05
(11)
Gold mined
000’oz
99.2
160.1
(38)
Strip ratio
waste/
ore
6.3
6.3
—
Tonnes milled
000
tonnes
4,652
4,497
3
(20)
Yield
g/t
0.80
1.00
Gold produced
000’oz
119.7
144.2
(17)
Gold sold
000’oz
122.7
143.8
(15)
AISC
AIC
Sustaining capital expenditure
Non-sustaining capital expenditure
Total capital expenditure
Adjusted pre-tax free cash flow
9
GOLD FIELDS H1 Results 2026
A$/oz
4,385
2,961
48
US$/oz
3,081
1,878
64
A$/oz
4,394
2,961
48
US$/oz
3,088
1,878
64
A$m
251.2
88.0
185
US$m
176.5
55.8
216
A$m
1.1
—
100
100
US$m
0.8
—
A$m
252.3
88.0
187
US$m
177.3
55.8
218
A$m
249.4
135.1
85
US$m
175.2
85.7
104
Year-on-year comparisons of financial results are
impacted by the acquisition of Gold Road on
26 September 2025 with results reported on a
100% basis from this date forward. Pre-September
2025 financial results were reported on a
50% basis.
Gold production decreased by 17% to 119,700oz
for H1 2026 from 144,200oz for H1 2025. H1 2026
production was affected by a significant rainfall
event, which disrupted ex-pit production for
approximately four weeks.
AIC increased by 48% to A$4,394/oz (US$3,088/oz)
in H1 2026 from A$2,961/oz (US$1,878/oz) in
H1 2025. The increase reflects higher production
costs due to inflationary pressures on commodity
inputs and employee and contractor costs,
increased capital expenditure, and lower gold
sales following the ounce production shortfall.
Total capital expenditure increased by 187% to
A$252m (US$177m) in H1 2026 from A$88m
(US$56m) in H1 2025, reflecting the recognition
of Gruyere's financial results at 100% following
the acquisition. The increase also included
A$31m (US$22m) of additional pre-strip mining
expenditure at Stage 6 of the Gruyere pit,
together with A$46m (US$32m) for the purchase
of three new excavators.
Adjusted pre-tax free cash flow for Gruyere
increased by 85% to A$249m (US$175m) in
H1 2026 from A$135m (US$86m) in H1 2025. The
increase reflected the recognition of Gruyere's
financial results at 100% following the acquisition,
lower gold sales and a higher realised gold price.
Review of operations continued
Granny Smith
June
2026
June
2025
%
Variance
Gold production increased by 10% to 147,400oz in
H1 2026 from 133,800oz in H1 2025 due to a 9%
increase in ore processed.
AIC increased by 7% to A$2,585/oz (US$1,816/oz)
in H1 2026 from A$2,423/oz (US$1,537/oz) in
H1 2025. The increase reflects higher production
costs due to inflationary pressures on commodity
inputs and employee and contractor costs, and
higher capital expenditure, partially offset by
higher gold sales.
Ore mined
000
tonnes
702
708
(1)
Waste mined
000
tonnes
225
264
(15)
Total tonnes mined
000
tonnes
927
972
(5)
Grade mined
g/t
6.39
6.15
4
Gold mined
000’oz
144.1
139.8
3
Tonnes milled
000
tonnes
770
705
9
g/t
5.95
5.90
1
Yield
Gold produced
000’oz
147.4
133.8
10
Gold sold
000’oz
144.3
128.7
12
A$/oz
2,543
2,374
7
AISC
AIC
Sustaining capital expenditure
Non-sustaining capital expenditure
Total capital expenditure
Adjusted pre-tax free cash flow
10
GOLD FIELDS H1 Results 2026
US$/oz
1,787
1,506
19
A$/oz
2,585
2,423
7
US$/oz
1,816
1,537
18
A$m
103.9
86.4
20
US$m
73.0
54.8
33
A$m
0.2
3.5
(94)
(91)
US$m
0.2
2.2
A$m
104.1
89.9
16
US$m
73.2
57.0
28
A$m
583.1
388.2
50
US$m
409.7
246.2
66
Total capital expenditure increased by 16% to
A$104m (US$73m) in H1 2026 from A$90m
(US$57m) in H1 2025. The increase was mainly
attributable to development in Zone 135 of the
Wallaby underground mine and construction of
the next tailings storage facility raise.
Adjusted pre-tax free cash flow for Granny Smith
increased by 50% to A$583m (US$410m) in
H1 2026 from A$388m (US$246m) in H1 2025,
mainly due to the higher gold price realised.
Review of operations continued
St Ives
June
2026
June
2025
%
Variance
Underground
Ore mined
000
tonnes
1,023
1,141
(10)
Waste mined
000
tonnes
515
500
3
Total tonnes mined
000
tonnes
1,538
1,641
(6)
Grade mined
g/t
3.89
3.60
8
Gold mined
000’oz
128.1
132.0
(3)
Surface
—
Ore mined
000
tonnes
1,194
1,114
7
Waste (Capital)
000
tonnes
2,167
2,524
(14)
Waste (Operational)
000
tonnes
1,283
1,843
(30)
Total waste mined
000
tonnes
3,450
4,367
(21)
Total tonnes mined
000
tonnes
4,645
5,481
(15)
Grade mined
g/t
1.29
2.00
(36)
Gold mined
000’oz
49.7
71.5
(30)
Strip ratio
waste/
ore
2.9
3.9
(26)
000
tonnes
2,217
2,255
(2)
Total grade mined
g/t
2.49
2.81
(11)
Total tonnes mined
000
tonnes
6,183
7,122
(13)
Total gold mined
000’oz
177.7
203.5
(13)
Tonnes milled
000
tonnes
2,165
2,294
(6)
Yield – underground
g/t
3.79
3.28
16
Yield – surface
g/t
1.37
1.73
(21)
Yield – combined
g/t
2.44
2.50
(2)
Gold produced
000’oz
169.8
184.5
(8)
Gold sold
000’oz
169.8
168.7
1
A$/oz
3,249
2,565
27
US$/oz
2,283
1,627
40
Total (underground and surface)
Total ore mined
AISC
AIC
Sustaining capital expenditure
Non-sustaining capital expenditure
Total capital expenditure
Adjusted pre-tax free cash flow
11
GOLD FIELDS H1 Results 2026
A$/oz
3,775
3,267
16
US$/oz
2,653
2,072
28
A$m
101.3
97.6
4
US$m
71.2
61.9
15
A$m
74.0
93.5
(21)
US$m
52.0
59.3
(12)
A$m
175.3
191.1
(8)
US$m
123.2
121.2
2
A$m
475.5
301.3
58
US$m
334.1
191.1
75
Gold production decreased by 8% to 169,800oz
in H1 2026 from 184,500oz in H1 2025, mainly
due to a 6% decrease in tonnes milled.
Results for H1 2026 includes an ore treatment
arrangement
with
Lunnon
Metals.
This
arrangement delivered 9,400oz at a cost of
A$43m.
AIC increased by 16% to A$3,775/oz (US$2,653/oz)
in H1 2026 from A$3,267/oz (US$2,072/oz) in
H1 2025. The increase reflected lower gold
sales and higher production costs, driven by
inflationary pressures on commodity inputs and
employee and contractor costs, partially offset by
lower capital expenditure.
Total capital expenditure decreased by 8% to
A$175m (US$123m) in H1 2026 from A$191m
(US$121m) in H1 2025, mainly due to lower
surface mine development following the
completion of the Swiftsure and Invincible South
open pits.
Adjusted pre-tax free cash flow at St Ives
increased by 58% to A$476m (US$334m) in
H1 2026 from A$301m (US$191m) in H1 2025,
reflecting lower gold sales, increased production
cost and the higher gold price realised.
Review of operations continued
Agnew
June
2026
June
2025
%
Variance
Underground
Ore mined
000
tonnes
564
549
3
Waste mined
000
tonnes
436
478
(9)
Total tonnes mined
000
tonnes
1,000
1,027
(3)
Grade mined
g/t
5.67
6.30
(10)
Gold mined
000’oz
102.8
111.3
(8)
Tonnes milled
000
tonnes
624
598
4
g/t
5.13
6.32
(19)
Gold produced
000’oz
102.8
121.5
(15)
Gold sold
000’oz
102.6
112.5
(9)
A$/oz
3,175
2,165
47
US$/oz
2,231
1,373
62
Yield
AISC
AIC
Sustaining capital expenditure
Non-sustaining capital expenditure
Total capital expenditure
Adjusted pre-tax free cash flow
12
GOLD FIELDS H1 Results 2026
A$/oz
3,403
2,581
32
US$/oz
2,391
1,637
46
A$m
56.2
29.6
90
US$m
39.5
18.8
110
A$m
11.4
38.0
(70)
US$m
8.0
24.1
(67)
A$m
67.6
67.6
—
US$m
47.5
42.9
11
A$m
327.3
251.2
30
US$m
230.0
159.3
44
Gold production decreased by 15% to 102,800oz
in H1 2026 from 121,500oz in H1 2025 due to
lower grade of ore mined and processed from the
Waroonga underground mine.
Ore production at Waroonga was affected by
three seismic events during H1 2026. During the
period of restricted access, production was
supplemented with increased ore from the lower
grade Barren Lands orebody, reducing the overall
yield and gold production for H1 2026.
AIC increased by 32% to A$3,403/oz (US$2,391/oz)
in H1 2026 from A$2,581/oz (US$1,637/oz) in
H1 2025. The increase reflects higher production
costs due to inflationary pressures on commodity
inputs and employee and contractor costs, along
with lower gold sales.
Total capital expenditure of A$68m (US$48m)
in H1 2026 was unchanged from H1 2025, in
A$ terms.
Adjusted pre-tax free cash flow for Agnew
increased by 30% to A$327m (US$230m) in
H1 2026 from A$251m (US$159m) in H1 2025,
mainly due to the higher gold price realised.
Review of operations continued
South Deep
June
2026
June
2025
%
Variance
Ore mined
000
tonnes
878
827
6
Waste mined
000
tonnes
121
154
(21)
Total tonnes
000
tonnes
999
981
2
Grade mined – underground reef
g/t
5.50
6.03
(9)
Grade mined – underground total
g/t
4.83
5.08
(5)
kg
4,826
4,989
(3)
000’oz
155.2
160.4
(3)
m
5,197
6,084
(15)
Gold mined
Total development
Secondary support
m
6,391
7,206
(11)
Backfill
m3
315,875
305,863
3
Ore processed – underground reef
000
tonnes
861
788
9
Ore processed – underground waste
000
tonnes
71
126
(44)
Total underground tonnes milled
000
tonnes
932
914
2
Ore processed – surface
000
tonnes
539
620
(13)
000
tonnes
1,471
1,534
(4)
Yield – underground reef
g/t
5.38
5.95
(10)
Surface yield
g/t
0.13
0.12
8
Total yield
g/t
3.19
3.10
3
kg
4,698
4,762
(1)
Total tonnes milled
Gold produced
Gold sold
151.0
153.1
(1)
kg
4,579
4,340
6
000’oz
147.2
139.5
6
R/kg 1,144,353 1,046,434
AISC
US$/oz
2,169
1,770
R/kg 1,173,095 1,046,434
AIC
Sustaining capital expenditure
Non-sustaining capital expenditure
Total capital expenditure
Adjusted free cash flow
13
000’oz
GOLD FIELDS H1 Results 2026
9
23
12
US$/oz
2,223
1,770
26
Rm
854.5
930.4
(8)
US$m
52.1
50.6
3
Rm
131.6
—
100
US$m
8.0
—
100
Rm
986.1
930.4
6
US$m
60.1
50.6
19
Rm
5,763.3
3,126.0
84
US$m
351.2
170.0
107
Gold production for the first half of 2026
remained broadly in line with the corresponding
period in 2025, decreasing by 1% to 4,698kg
(151koz) from 4,762kg (153koz). This performance
was achieved despite a 9% reduction in
underground grade offset by a 6% increase in
reef tonnes. The lower grade was largely a
consequence of the full implementation of the
new mining sequence, which affected the mix of
mining areas and grade profile during the period.
The transition to the new mining sequence also
resulted in a 15% reduction in total development
metres, which in turn contributed to an 11%
decrease in secondary support installation
compared with the first half of 2025. Surface
tonnes milled decreased by 13%, from 739kt in
the first half of 2025 to 639kt in the first half of
2026, primarily due to scheduled maintenance
associated with the thickened tailings project.
The project is aimed at reducing the volume of
water reporting to the tailings storage facility and
forms part of ongoing efforts to improve water
management and operational efficiency.
AIC R/kg increased by 12% to R1,173,095/kg
(US$2,223/oz) in H1 2026 from R1,046,434/kg
(US$1,770/oz) in H1 2025, due to higher cost of
sales before amortisation and depreciation,
higher capital expenditure and higher royalty
cost, partially offset by 6% higher gold sold.
Total capital expenditure increased by 6% to
R986m (US$60m) in H1 2026 from R930m
(US$51m) in H1 2025, due to higher capital
development and an increase in fleet
refurbishments.
Adjusted free cash flow increased by 84% to
R5,763m (US$351m) in H1 2026 from R3,126m
(US$170m) in H1 2025. The increase is mainly due
to higher gold sold, and higher gold prices
received.
Review of operations continued
Damang
June
2026
June
2025
%
Variance
Ore mined
000
tonnes
779
10
7,690
Waste (Operational)
000
tonnes
6,101
516
1,082
Total waste mined
000
tonnes
6,101
516
1,082
Total tonnes mined
000
tonnes
6,880
526
1,208
Grade mined
g/t
0.75
0.78
(4)
Gold mined
000’oz
18.8
0.2
9,300
Strip ratio
waste/
ore
7.8
53.3
(85)
Tonnes milled
000
tonnes
1,333
2,327
(43)
g/t
0.52
0.69
(25)
Yield
Gold produced
000’oz
22.1
51.7
(57)
Gold sold
000’oz
22.7
51.7
(56)
AISC
US$/oz
4,166
2,070
101
AIC
US$/oz
4,166
2,070
101
Sustaining capital expenditure
US$m
—
(2.7)
(100)
Non-sustaining capital expenditure
US$m
—
—
—
Total capital expenditure
US$m
—
(2.7)
(100)
Adjusted free cash flow
US$m
(79.3)
60.4
(231)
14
GOLD FIELDS H1 Results 2026
The Damang mine was formally transferred to the
Government of Ghana on 18 April 2026 following
the expiry of the 12-month mining lease that was
granted to Gold Fields in April 2025. As a result
of the transfer, comparisons to prior periods are
not on a like-for-like basis.
Gold production decreased by 57% to 22,100oz
in H1 2026 from 51,700oz in H1 2025 due to
lower yield and lower tonnes milled. Yield
decreased by 25% to 0.52g/t in H1 2026 from
0.69g/t in H1 2025 due to lower grade fed.
AIC increased by 101% to US$4,166/oz in H1 2026
from US$2,070/oz in H1 2025 due to lower gold
sold. In H1 2026, gold sold decreased by 56% to
22,700oz from 51,700oz in H1 2025 due to lower
gold produced.
Adjusted free cash flow for Damang decreased
by 231% to a negative US$79m in H1 2026 from
US$60m in H1 2025, mainly due to lower revenue
driven by lower gold sold.
Review of operations continued
Tarkwa
June
2026
June
2025
%
Variance
Ore mined
000
tonnes
4,004
5,552
(28)
Waste (Capital)
000
tonnes
24,362
17,726
37
Waste (Operational)
000
tonnes
17,837
24,133
(26)
Total waste mined
000
tonnes
42,199
41,859
1
Total tonnes mined
000
tonnes
46,203
47,411
(3)
Grade mined
g/t
1.16
1.15
1
Gold mined
000’oz
149.7
204.8
(27)
Strip ratio
waste/
ore
10.5
7.5
40
Tonnes milled
000
tonnes
7,045
7,441
(5)
Yield
g/t
0.85
0.97
(12)
Gold produced
000’oz
191.9
232.9
(18)
Gold sold
000’oz
192.7
233.8
(18)
AISC
US$/oz
2,671
2,035
31
AIC
US$/oz
2,725
2,035
34
Sustaining capital expenditure
US$m
158.3
118.2
34
Non-sustaining capital expenditure
US$m
10.3
—
100
Total capital expenditure
US$m
168.6
118.2
43
Adjusted free cash flow
US$m
278.5
206.5
35
15
GOLD FIELDS H1 Results 2026
Gold production decreased by 18% to 191,900 in
H1 2026 from 232,900oz in H1 2025 due to lower
yield and lower tonnes milled. Yield decreased by
12% to 0.85g/t in H1 2026 from 0.97g/t in H1 2025
due to lower grade fed. In H1 2026, 3.61Mt was
fed from ex-pit at a grade of 1.15g/t and 3.43Mt
from stockpile at a grade of 0.74g/t compared to
4.68Mt from ex-pit at a grade of 1.19g/t and
2.76Mt from stockpile at a grade of 0.81g/t in
H1 2025. Tonnes milled decreased by 5% to
7.04Mt in H1 2026 from 7.44Mt in H1 2025 due to
lower plant availability resulting from extended
downtime to repair the SAG mill trunnion journal.
AIC increased by 34% to US$2,725/oz in H1 2026
from US$2,035/oz in H1 2025 due to lower gold
sold and higher capital expenditure. In H1 2026,
gold sold decreased by 18% to 192,700oz
from 233,800oz in H1 2025 due to lower gold
produced.
Total capital expenditure increased by 43% to
US$169m in H1 2026 from US$118m in H1 2025
due to higher capital waste stripping and
infrastructure relocation.
Adjusted free cash flow for Tarkwa increased by
35% to US$279m in H1 2026 from US$207m in
H1 2025, mainly due to higher revenue driven by
a higher gold price.
Review of operations continued
Salares Norte
June
2026
June
2025
%
Variance
Ore mined
000
tonnes
2,359
930
154
Waste (capital)
000
tonnes
3,554
11,675
(70)
Waste (operational)
000
tonnes
5,018
424
1,083
Total waste mined
000
tonnes
8,572
12,099
(29)
Total tonnes mined
000
tonnes
10,931
13,029
(16)
Strip ratio
waste/
ore
3.63
13.01
(72)
g/t
4.75
4.91
(3)
Grade mined – gold
Grade mined – silver
g/t
77.06
152.55
(49)
Gold mined
000’oz
360.2
146.9
145
Silver mined
000’oz 5,843.6
4,563.0
28
Tonnes milled
000
tonnes
469
121
Gold recoveries
per cent
92 %
85 %
8
Silver recoveries
per cent
81 %
56 %
45
g/t
8.8
8.0
10
338
Yield - Gold
1,035
g/t
76.7
17.5
eq g/t
10.1
8.2
23
Gold produced
000’oz
294.3
120.8
144
Silver produced
000’oz 2,553.1
264.2
866
Total equivalent gold produced
000’
eq oz
336.9
123.6
173
Total equivalent gold sold
000’
eq oz
333.8
123.8
170
AISC
US$/oz
269
1,689
(84)
AISC
US$/
eq oz
837
1,720
(51)
AIC
US$/oz
338
2,328
(85)
AIC
US$/
eq oz
897
2,345
(62)
Sustaining capital expenditure
US$m
36.2
143.6
(75)
Non-sustaining expenditure
US$m
10.6
66.8
(84)
Total capital expenditure
US$m
46.8
210.4
(78)
Adjusted free cash flow
US$m
1,191.4
122.0
877
16
GOLD FIELDS H1 Results 2026
Gold production increased by 144% to 294,300oz
in H1 2026 from 120,800oz in H1 2025 and silver
production increased by 866% to 2,553,100oz
in H1 2026 from 264,200oz in H1 2025. Goldequivalent production increased by 173% to
336,900eqoz in H1 2026 from 123,600eqoz in
H1 2025. The above increases were driven by
higher tonnes milled and improved gold and
silver recoveries following the ramp-up of the
operation.
AIC decreased by 85% to US$338/oz in H1 2026
from US$2,328/oz in H1 2025, mainly due to the
significant increase in production and sales
volumes, and decrease in capital expenditure as
the operation transitioned from construction and
ramp-up to production.
Total capital expenditure decreased by 78% to
US$47m in 2026 from US$210m in H1 2025,
primarily reflecting the completion in 2025 of
major winterisation and plant-readiness works.
Adjusted free cash flow increased to US$1,191m in
H1 2026 from US$122m in H1 2025, reflecting
higher production and sales volumes and lower
capital expenditure following the transition to a
producing operation.
Review of operations continued
Cerro Corona
June
2026
June
2025
%
Variance
Ore mined
000
tonnes
—
7,024
(100)
Waste mined
000
tonnes
—
3,308
(100)
Total tonnes mined
000
tonnes
—
10,332
(100)
Grade mined – gold
g/t
—
0.64
(100)
Grade mined – copper
per cent
—
0.37
(100)
Gold mined
000’oz
—
144.2
(100)
Copper mined
000
tonnes
—
25,726
(100)
Tonnes milled
000
tonnes
3,186
3,276
(3)
Gold recoveries
per cent
68.1
76.4
(11)
Copper recoveries
per cent
84.1
91.6
(8)
g/t
0.32
0.59
(46)
per cent
0.29
0.39
(26)
– Combined
eq g/t
0.56
0.92
(39)
Gold produced
000’oz
31.9
60.1
(47)
Copper produced
tonnes
8,930
12,147
(26)
Total equivalent gold produced
000’
eq oz
56.9
97.4
(42)
Total equivalent gold sold
000’
eq oz
56.0
95.2
(41)
AISC
US$/oz
1,284
319
303
AISC
US$/
eq oz
2,846
1,343
112
AIC
US$/oz
1,616
443
265
AIC
US$/
eq oz
3,032
1,420
114
Sustaining capital expenditure
US$m
0.4
0.9
(56)
Non-sustaining capital expenditure
US$m
5.5
3.6
53
Total capital expenditure
US$m
5.9
4.5
31
Adjusted free cash flow
US$m
71.4
114.6
(38)
Yield – Gold
– Copper
17
GOLD FIELDS H1 Results 2026
Gold production decreased by 47% to 31,900oz
in H1 2026 from 60,100oz in H1 2025 and
copper production decreased by 26% to 8,930t
in H1 2026 from 12,147t in H1 2025. The
decreases are mainly explained by lower head
grades, combined with lower throughput and
metallurgical recoveries as result of ore ageing.
Consequently, total equivalent gold production
decreased by 42% to 56,900oz in H1 2026 from
97,400oz in H1 2025. Production in H1 2026
resulted from the processing of low-grade
stockpiles, as planned in the mine schedule for
treatment from 2026 onwards.
AIC per gold ounce increased by 265% to
US$1,616/oz in H1 2026 from US$443/oz in
H1 2025, mainly due to lower gold sold and the
negative impact of the gold inventory change.
Total capital expenditure increased by 31% to
US$6m in H1 2026 from US$5m in H1 2025, due
to the In-pit Tailing construction activities during
H1 2026.
Adjusted free cash flow for Cerro Corona
decreased by 38% to US$71m in H1 2026,
compared to US$115m in H1 2025. This decrease
was primarily driven by lower revenues resulting
from reduced sales volumes of gold and copper.
Cash dividend
In line with the Company’s dividend policy, the Board has approved and declared an interim dividend number 104 of 1,625 SA cents per ordinary share
(gross) in respect of the six months ended 30 June 2026. The interim dividend will be subject to the dividend withholding tax of 20% (twenty per cent).
In accordance with paragraph 7.23 of the JSE Listings Requirements, the following additional information is disclosed:
• The dividend has been declared out of income reserves
• The gross local dividend amount is 1,625 SA cents per ordinary share for shareholders exempt from dividends tax
• The dividend withholding tax of 20% (twenty per cent) will be applicable to this dividend
• The net local dividend amount is 1,300 SA cents per ordinary share for shareholders liable to pay the dividends tax
• Gold Fields currently has 895,024,247 ordinary shares in issue, and
• Gold Fields’ income tax number is 9160035607
Shareholders are advised of the following dates in respect of the interim dividend:
• Interim dividend number 104: 1,625 SA cents per share
• Declaration date: Tuesday, 25 August 2026
• Last date to trade cum-dividend: Tuesday, 8 September 2026
• Sterling and US Dollar conversion date: Wednesday, 9 September 2026
• Shares commence trading ex-dividend: Wednesday, 9 September 2026
• Record date: Friday, 11 September 2026, and
• Payment of dividend: Monday, 14 September 2026
Share certificates may not be dematerialised or rematerialised between 9 September 2026 and 11 September 2026, both dates inclusive.
18
GOLD FIELDS H1 Results 2026
Basis of preparation
The unaudited consolidated interim financial statements for the six
months ended 30 June 2026 were prepared in accordance with
the framework concepts and the measurement and recognition
requirements of International Financial Reporting Standards (IFRS), the
Financial Pronouncements as issued by the Financial Reporting
Standard Council, the SAICA Financial Reporting Guides as issued by
the Accounting Practices Committee (as applicable) and in accordance
with and contain the information required by IAS 34 Interim Financial
Reporting, the requirements of the South African Companies Act of
South Africa, Act 71 of 2008 (Companies Act), as amended, and the
JSE Limited Listings Requirements.
The consolidated interim financial statements are prepared on a going
concern basis.
The consolidated interim financial statements are presented in United
States Dollars, which is Gold Fields Limited’s presentation currency.
The accounting policies applied in the preparation of these condensed
consolidated financial statements are in terms of IFRS and are
consistent with those applied in the previous annual financial
statements.
Pro forma financial information
The unaudited consolidated interim financial statements contain certain
non-IFRS financial measures in respect of the Group’s financial
performance, the statement of financial position and cash flows
presented in order to provide users with relevant information and
measures used by the Group to assess performance. These measures
constitute pro forma financial information in terms of the JSE Limited
Listings Requirements and are the responsibility of the Group’s Board
of Directors. They are presented for illustrative purposes only and due
to their nature, may not fairly present Gold Fields’ financial position,
changes in equity, results of operations or cash flows.
This pro forma financial information has not been reviewed or reported
on by the Group’s auditors, being PricewaterhouseCoopers Inc.
The key non-IFRS measures used and defined in the interim results
include:
• Net debt, which is calculated as borrowings plus the current portion
of borrowings and lease liabilities plus current portion of lease
liabilities less cash and cash equivalents;
• Net debt (excluding lease liabilities), which is calculated as
borrowings plus the current portion of borrowings less cash and cash
equivalents;
• Adjusted free cash flow is calculated as net cash from operations,
South Deep BEE dividend, less net capital expenditure, contributions
to environmental trust funds and payments of lease liabilities;
• Adjusted free cash flow from operations is calculated as cash flow
from operating activities less net capital expenditure, environmental
payments and lease payments from the eight mining operations;
• Adjusted free cash flow before discretionary growth investments is
calculated as adjusted free cash flow plus non-cash and cash
remuneration (share-based payments and long-term incentive plan)
lease payments, exploration costs and non-sustaining capital, all
related to discretionary growth areas of the Group.
• Adjusted EBITDA is required to be determined in terms of loan and
revolving credit facilities agreements to evaluate compliance with
debt covenants;
• Sustaining capital expenditure represents the majority of capital
expenditures at existing operations, including mine development
costs, ongoing replacement of mine equipment and other capital
facilities and other capital expenditures at existing operations;
• Non-sustaining capital expenditure represents capital expenditures
for major growth projects as well as enhancement capital for
significant infrastructure improvements at existing operations;
• AISC and total AIC are presented to provide transparency into the
costs associated with producing and selling an ounce of gold and is
a common measure presented within the mining industry; and
• Cash costs are calculated as costs of sales less amortisation and
depreciation, gold inventory change, by-product credits, corporate
costs plus royalties.
19
GOLD FIELDS H1 Results 2026
Mineral Resources and Mineral Reserves
There were no material changes to the Mineral Resources and
Mineral Reserves from what was previously reported by the Group at
31 December 2025.
Ghana US$100m revolving credit facility
On 13 April 2026, the final maturity date of the Ghana US$100m RCF
was extended by one year to 13 April 2027.
Segment reporting
The net profit/(loss) for continuing and discontinued operations per the
income statement reconciles to the net profit/(loss) in the segmental
operating and financial results as follows:
US$’m
June 2026
June 2025
Net profit
1,902.3
1,056.3
– Operating segments
2,275.1
1,198.5
– Corporate and projects1
(372.8)
(142.2)
1
Comprises mainly non-mine interest, exploration related to the Windfall project and
other costs
Mike Fraser
Chief Executive Officer
25 August 2026
The financial statements are presented on a condensed consolidated basis.
Income statement
United States Dollars
Six months ended
Figures in millions unless otherwise stated
Notes
June 2026
June 2025
1
2
3
4
5
5,936.9
(2,307.6)
33.9
(110.1)
1.0
(40.1)
(20.2)
(6.0)
(4.9)
(179.2)
3,303.7
(59.7)
3,244.0
3,317.7
(1,468.9)
19.3
(41.5)
(1.3)
33.5
(9.4)
(14.5)
(16.2)
(132.6)
1,686.1
(4.5)
1,681.6
(139.3)
3,104.7
(1,183.8)
(1,018.1)
(165.7)
(89.1)
1,592.5
(565.0)
(379.8)
(185.2)
1,920.9
1,027.5
(18.6)
1,902.3
28.8
1,056.3
1,854.6
1,871.3
(16.7)
47.7
49.6
(1.9)
1,026.7
1,000.8
25.9
29.6
26.7
2.9
1,902.3
1,056.3
1,854.6
1,871.3
(16.7)
1,846.6
1,863.3
1,026.7
1,000.8
25.9
1,017.4
991.5
(16.7)
207
209
(2)
206
208
(2)
25.9
115
112
3
114
111
3
Continuing operations
Revenue
Cost of sales
Investment income
Finance expense
Share of results of equity accounted investees, after taxation
(Loss)/gain on foreign exchange
Share-based payments
Long-term incentive plan
Other costs, net
Exploration expenses
Profit before royalties, taxation and non-recurring items
Non-recurring items
Profit before royalties and taxation
Royalties
Profit before taxation
Mining and income taxation
Normal taxation
Deferred taxation
6
7
8
Profit from continuing operations
Discontinued operation
(Loss)/profit from discontinued operation, net of tax
Profit for the period
Profit/(loss) attributable to:
Owners of the parent
Owners of the parent - continuing operations
Owners of the parent - discontinued operation
Non-controlling interests
Non-controlling interests - continuing operations
Non-controlling interests - discontinued operation
9
Profit attributable to owners of the parent
Profit attributable to owners of the parent - continuing operations
(Loss)/profit attributable to owners of the parent - discontinued operation
Diluted profit attributable to owners of the parent
Diluted profit attributable to owners of the parent - continuing operations
Diluted (loss)/profit attributable to owners of the parent - discontinued operation
Basic earnings per share (cents) attributable to owners of the parent
Basic earnings per share (cents) attributable to owners of the parent - continuing operations
Basic (loss)/earning per share (cents) attributable to owners of the parent - discontinued operation
Diluted earnings per share (cents) attributable to owners of the parent
Diluted earnings per share (cents) attributable to owners of the parent - continuing operations
Diluted (loss)/earnings per share (cents) attributable to owners of the parent - discontinued operation
20
GOLD FIELDS H1 Results 2026
10.1
10.2
10.3
10.4
10.5
10.6
Income statement continued
United States Dollars
Six months ended
Figures in millions unless otherwise stated
Other disclosures
Non-recurring items:
Profit on disposal of assets
Restructuring costs
Impairment of assets
Royalties - fair value gain
Gruyere rainfall event
Gold Road stamp duty
Other
Total non-recurring items
Headline earnings attributable to owners of the parent
Headline earnings attributable to owners of the parent - continuing operations
Headline (loss)/earnings attributable to owners of the parent - discontinued operation
Diluted headline earnings attributable to owners of the parent
Diluted headline earnings attributable to owners of the parent - continuing operations
Diluted headline (loss)/earnings attributable to owners of the parent - discontinued operation
Headline earnings per share (cents) attributable to owners of the parent
Headline earnings per share (cents) attributable to owners of the parent - continuing operations
Headline (loss)/earnings per share (cents) attributable to owners of the parent - discontinued
operation
Diluted headline earnings per share (cents) attributable to owners of the parent
Diluted headline earnings per share (cents) attributable to owners of the parent - continuing
operations
Diluted (loss)/headline earnings per share (cents) attributable to owners of the parent - discontinued
operation
US Dollar/South African Rand conversion rate
Canadian Dollar/US Dollar conversion rate
Australian Dollar/US Dollar conversion rate
Notes
June 2026
June 2025
0.2
(0.1)
(0.5)
37.5
—
(85.8)
(11.0)
(59.7)
0.6
(1.9)
(0.1)
—
6.0
—
(9.1)
(4.5)
10.7
10.8
1,854.7
1,871.6
(16.9)
1,846.7
1,863.6
(16.9)
208
210
1,027.3
1,001.4
25.9
1,018.0
992.1
25.9
115
112
10.9
10.10
(2)
206
3
114
10.11
208
111
10.12
(2)
3
16.41
0.73
0.70
18.39
0.71
0.63
12
The condensed consolidated financial statements for the six months ended 30 June 2026 have been prepared by the corporate accounting staff of Gold Fields Limited headed by Tzvet
Ilarionova, the Group Financial Controller. This process was supervised by Alex Dall, the Group Chief Financial Officer.
21
GOLD FIELDS H1 Results 2026
Statement of comprehensive income
United States Dollars
Six months ended
June 2026
June 2025
1,902.3
1,056.3
Other comprehensive income, net of tax
58.0
204.8
Equity investments at FVOCI – net change in fair value*
(22.2)
4.9
Taxation on above item*
(1.6)
(0.4)
Foreign currency translation adjustments#
81.8
200.3
1,960.3
1,261.1
– Owners of the parent
1,911.5
1,227.9
– Non-controlling interest
48.8
33.2
1,960.3
1,261.1
Figures in millions unless otherwise stated
Profit for the period
Total comprehensive income for the period
Attributable to:
- Items that will not be reclassified to profit or loss.
Items can be subsequently reclassified to profit or loss.
22
GOLD FIELDS H1 Results 2026
Statement of financial position
United States Dollars
Figures in millions unless otherwise stated
Notes
June 2026
December 2025
Non-current assets
12,383.6
12,176.8
Property, plant and equipment
11,570.0
11,336.8
581.6
587.4
Other non-current assets
Equity-accounted investees
Investments
Asanko contingent consideration receivable1
12
3.9
2.8
174.5
189.6
—
22.0
Deferred taxation
53.6
38.2
Current assets
3,216.3
2,970.9
Other current assets1
1,019.2
1,191.7
Cash and cash equivalents2
2,197.1
1,779.2
—
77.5
Total assets
15,599.9
15,225.2
Total equity
9,223.9
8,672.4
Non-current liabilities
4,657.4
4,852.9
Assets held for sale
12
Deferred taxation
1,615.7
1,401.7
2,174.7
2,559.5
Environmental rehabilitation provisions
503.6
489.2
Lease liabilities
356.0
379.1
Long-term employee benefits
—
20.4
Other long-term provisions
7.4
3.0
1,718.6
1,699.9
1,589.5
1,373.2
—
178.7
Borrowings
13
Current liabilities
Other current liabilities
Current portion of borrowings
13
Current portion of employee benefits
25.3
44.1
Current portion of lease liabilities
103.8
103.9
15,599.9
15,225.2
Net debt
437.4
1,442.0
Net debt (excluding lease liabilities)
(22.4)
959.0
US Dollar/South African Rand conversion rate
16.39
16.56
Canadian Dollar/US Dollar conversion rate
0.70
0.73
Australian Dollar/US Dollar conversion rate
0.69
0.67
Total equity and liabilities
Non-IFRS measures and other disclosures
1
2
At 31 December 2025, other current assets included the Asanko deferred consideration receivable of US$28.1m. During H1 2026, the Asanko deferred and contingent
considerations receivable were sold as part of sale of the royalty portfolio. Refer note 12 for further details.
Cash and cash equivalents include secured cash deposits of US$144.2m (2025: US$119.0m) and US$20.0m (2025: US$20.0m) for Australia and Peru, respectively, set aside for
future rehabilitation costs. The contributions are proactive and not legally required by local legislation.
23
GOLD FIELDS H1 Results 2026
Statement of changes in equity
United States Dollar
Six months ended
Figures in millions unless otherwise stated
Balance at 31 December 2025
Stated
capital
Other
reserves1
Retained
earnings
Noncontrolling
interests
Total
equity
8,672.4
3,844.8
(2,089.5)
6,677.3
239.8
Total comprehensive income
—
56.9
1,854.6
48.8
1,960.3
Profit for the period from continuing operations
—
—
1,871.3
49.6
1,920.9
Loss for the period from discontinued operation
—
—
(16.7)
(1.9)
(18.6)
Other comprehensive income
—
56.9
—
1.1
58.0
Dividends declared
—
—
(1,234.1)
(39.5)
(1,273.6)
(155.4)
Share buy-back2
(155.4)
—
—
—
Issue of treasury shares to employees3
26.4
(26.4)
—
—
—
—
20.2
—
—
20.2
3,715.8
(2,038.8)
7,297.8
249.1
9,223.9
Share-based payments
Balance at 30 June 2026
Other reserves mainly comprise foreign currency translation, share-based payments and share of equity-accounted investee’s other comprehensive income.
2 During February 2026, Gold Fields announced the US$100m share buy-back programme. During H1 2026, the Board approved a further US$200m for the programme, bringing the
total share buy-backs to US$300m. As at 30 June 2026, 4,106,519 shares amounting to US$155.4m were bought back as part of the programme of which 3,057,395 shares amounting
to US$120.2m were fully paid at 30 June 2026.
3 Treasury shares were issued to participants upon vesting of employee share options in 2026.
1
United States Dollar
Six months ended
Figures in millions unless otherwise stated
Stated
capital
Other
reserves1
Retained
earnings
Noncontrolling
interests
Total
equity
Balance at 31 December 2024
5,366.9
3,871.5
(2,528.1)
3,858.0
165.5
Total comprehensive income
—
201.2
1,026.7
33.2
1,261.1
Profit for the period from continuing operations
—
—
1,000.8
26.7
1,027.5
Profit for the period from discontinued operation
—
—
25.9
2.9
28.8
Other comprehensive income
—
201.2
—
3.6
204.8
Dividends declared - continuing operations
—
—
(346.1)
(29.1)
(375.2)
Dividends declared - discontinued operation
—
—
—
(6.0)
(6.0)
Acquisition of treasury shares2
(9.6)
—
—
—
(9.6)
Issue of treasury shares to employees2
9.6
(9.6)
—
—
—
Share-based payments from continuing operations
—
9.4
—
—
9.4
3,871.5
(2,327.1)
4,538.6
163.6
6,246.6
Balance at 30 June 2025
1
Other reserves mainly comprise foreign currency translation, share-based payments and share of equity-accounted investee’s other comprehensive income.
2 Treasury shares were bought by the Group and issued to participants upon vesting of employee share options in 2025.
24
GOLD FIELDS H1 Results 2026
Statement of cash flows
United States Dollar
Six months ended
June 2026
June 2025
1,792.8
4,007.7
29.7
209.3
4,246.7
(1.5)
(95.2)
(1,042.2)
3,107.8
(1,274.0)
(1,234.1)
(39.5)
(0.4)
1,833.8
(41.0)
1,306.1
2,038.7
14.0
92.6
2,145.3
(0.6)
(80.8)
(438.1)
1,625.8
(375.9)
(346.1)
(29.1)
(0.7)
1,249.9
56.2
(585.5)
(709.1)
—
0.2
115.0
52.0
(35.5)
39.2
(10.8)
(549.0)
(36.5)
(656.1)
(667.4)
(4.1)
1.5
—
—
(32.3)
48.9
(4.4)
(657.8)
1.7
Cash flows from financing activities
Loans received
Loans repaid
Purchase of treasury shares
Buy-back of shares
Payment of principal lease liabilities
Cash utilised in continuing operations
Cash utilised in discontinued operation
(780.2)
65.3
(659.1)
—
(120.2)
(66.2)
(780.2)
—
(491.3)
853.0
(1,283.7)
(9.6)
—
(47.5)
(487.8)
(3.5)
Net cash generated
Translation adjustment
Cash and cash equivalent at beginning of the period
Cash and cash equivalent at end of the period
Non-IFRS measures and other disclosures
Adjusted free cash flow
Adjusted free cash flow before discretionary growth investments
427.1
(9.2)
1,779.2
2,197.1
158.7
47.6
860.2
1,066.5
2,225.3
2,510.0
951.7
1,251.0
Figures in millions unless otherwise stated
Cash flows from operating activities
Cash generated by operations
Interest received
Change in working capital
Cash generated by operating activities
Silicosis payment
Interest paid
Royalties and taxation paid
Net cash from operations
Dividends paid
Owners of the parent
Non-controlling interest holders
South Deep BEE dividend
Cash generated by continuing operations
Cash (utilised in)/generated by discontinued operation
Cash flows from investing activities
Additions to property, plant and equipment
Capital expenditure – working capital
Proceeds on disposal of property, plant and equipment
Proceeds on disposal of royalties
Proceeds on disposal of Asanko deferred and contingent considerations
Purchase of investments
Proceeds on disposal of investments
Contributions to environmental trust funds
Cash utilised in continuing operations
Cash (utilised in)/generated by discontinued operation
25
GOLD FIELDS H1 Results 2026
Notes
11
12
12
Notes to the condensed consolidated financial statements
United States Dollar
Six months ended
June 2026
June 2025
Revenue from contracts with customers
5,936.9
3,317.7
– Gold1
– Copper2
5,610.3
119.0
3,197.1
109.0
– Silver3
Disclosure of disaggregated revenue from contracts with customers
207.6
11.6
Salaries and wages
(284.2)
(227.3)
Consumable stores
(261.2)
(187.5)
Utilities
(107.6)
(79.8)
Mine and other contractors
(599.8)
(415.9)
Figures in millions unless otherwise stated
Revenue
The Group generates revenue primarily from the sale of gold and silver bullion and copper concentrate
to refineries and banks. All revenue from contracts with customers is recognised at a point in time.
The disaggregation of revenue from contracts with customers by primary geographical market and
product is described in the segmental operating and financial results (pages 36 and 37)
Cost of sales
Other
(356.5)
(255.2)
Cost of sales before gold inventory change and amortisation and depreciation
(1,609.3)
(1,165.7)
Gold inventory change
Cost of sales before amortisation and depreciation
Amortisation and depreciation
(629.0)
(361.3)
(1,468.9)
Unwinding of discount rate/net change in fair value of Asanko deferred and contingent considerations
1.9
2.9
Interest received – environmental trust funds
2.3
2.4
Interest received – cash balances
29.7
14.0
Total investment income
33.9
19.3
Interest expense – borrowings
(79.2)
(68.9)
Interest expense – lease liability
(16.1)
(12.0)
Interest expense – environmental rehabilitation
(14.6)
(13.1)
Unwinding of discount rate on silicosis settlement costs
(0.2)
(0.2)
—
52.7
(110.1)
(41.5)
Lunnon Metals Limited
1.0
(1.3)
Share of results of equity-accounted investees, after taxation
1.0
(1.3)
Investment income
Finance expense
Borrowing costs capitalised4
Total finance expense
Share of results of equity-accounted investees, after taxation
1
2
3
4
26
58.1
(1,107.6)
(2,307.6)
Total cost of sales
(69.3)
(1,678.6)
All regions.
Only Peru region (Cerro Corona).
Mainly Salares Norte.
General borrowing costs of US$52.7m arising on Group general borrowings were capitalised during 2025 and related to the Salares Norte project. Salares Norte reached
commercial levels of production on 31 August 2025. An average interest capitalisation rate of 3.3% was applied.
GOLD FIELDS H1 Results 2026
Notes to the condensed consolidated financial statements continued
United States Dollar
Six months ended
June 2026
June 2025
Australia
(33.2)
(27.8)
Ghana
(2.0)
—
Chile
(9.6)
(10.7)
Figures in millions unless otherwise stated
Exploration expense
Peru
(5.8)
(3.9)
Canada
(126.7)
(82.9)
Other
(1.9)
(7.3)
(179.2)
(132.6)
Australia
(62.1)
(37.4)
South Africa
(27.5)
(7.7)
Ghana
(44.7)
(35.9)
Total exploration expense
Royalties
Peru
Total royalties
(5.0)
(8.1)
(139.3)
(89.1)
Royalty rates
South Africa (effective rate)1
4.0 %
1.8%
Australia2
2.5 %
2.5%
Ghana3
5.0 %
5.0%
Peru4
3.5 %
4.7%
1
2
3
4
27
The Mineral and Petroleum Resource Royalty Act 2008 (Royalty Act) imposes a royalty on refined (mineral resources that have undergone a comprehensive level of
beneficiation such as smelting and refining as defined in Schedule 1 of the Act) and unrefined (mineral resources that have undergone limited beneficiation as defined in
Schedule 2 of the Act) minerals payable to the state. The royalty in respect of refined minerals (which include gold refined to 99.5% and above and platinum) is calculated by
dividing earnings before interest and taxes (EBIT) by the product of 12.5 times gross revenue calculated as a percentage, plus an additional 0.5%. EBIT refers to taxable
mining income (with certain exceptions such as no deduction for interest payable and foreign exchange losses) before assessed losses but after capital expenditure.
A maximum royalty of 5% has been introduced on refined minerals. During the period ended 30 June 2026, both GFO and GFIJVH fully utilised their available unredeemed
capital expenditure balances, resulting in an effective royalty tax rate of 4.0% of mining revenue (2025: 1.8%).
The Australian operations are subject to a 2.5% (2025: 2.5%) gold royalty on revenue as the mineral rights are owned by the state.
Minerals are owned by the Republic of Ghana and held in trust by the President. In 2016, Gold Fields signed a Development Agreement (DA) with the Government of Ghana
for both the Tarkwa and Damang mines. This agreement stated that the Ghanaian operations will be subject to a mining royalty calculated on a sliding scale with rates
ranging from 3% to 5%, linked to the prevailing gold price. Tarkwa’s initial tax stability period under the DA is valid until 17 April 2027.
Damang’s mining lease and DA expired on 18 April 2025, however following negotiations with the Government of Ghana, a one year extension, which was ratified by
Parliament was granted to 18 April 2026. Ownership of Damang was transferred to the Government of Ghana effective 18 April 2026.
In December 2025, the Government of Ghana tabled a Legislative Instrument (LI) in Parliament to effect new regulations which introduce new royalty rates in Ghana for gold
and other minerals (including Lithium). The LI was approved effective 10 March 2026 with a royalty range of 5% to 12% on a sliding scale, depending on global gold prices. As
a measure of relief, The Government of Ghana subsequently reduced the Growth and Sustainability Levy from 3% to 1%. Gold Fields has a Development Agreement (DA),
which provides a range of fiscal concessions and includes key stabilising provisions in relation to taxes, royalties and other matters. The DA protects Tarkwa from these
royalty changes until April 2027.
The Peruvian operations are subject to a mining royalty calculated on a sliding scale with rates ranging from 1% to 12% of the value of operating profit.
GOLD FIELDS H1 Results 2026
Notes to the condensed consolidated financial statements continued
United States Dollar
Six months ended
Figures in millions unless otherwise stated
June 2026
June 2025
Mining and income taxation
The components of mining and income tax are the following:
South African taxation
– company and capital gains taxation
(3.5)
(2.8)
– withholding tax
– mining taxation1
(14.6)
(15.2)
(15.3)
—
– non-mining taxation2
– prior year adjustment - current taxation
(0.6)
1.4
(0.2)
—
– deferred taxation
Foreign taxation
(85.0)
(77.4)
– current taxation
– withholding tax
(892.7)
(52.8)
(361.5)
—
– prior year adjustment – current taxation
– deferred taxation
(40.0)
(80.8)
—
(107.8)
(1,183.8)
(565.0)
Y=33-165/X
Y=33-165/X
27.0%
27.0%
27.0%
27.0%
30.0%
32.5%
29.5%
27.0%
30.0%
32.5%
29.5%
27.0%
Total mining and income taxation
South Africa – current tax rates
Mining tax1
Non-mining tax2
Company tax rate
International operations – current tax rates
Australia
Ghana
Peru
Chile
1
2
South African mining tax on mining income is determined according to a formula which takes into account the profit and revenue from mining operations. South African
mining taxable income is determined after the deduction of all mining capital expenditure, with the proviso that this cannot result in an assessed loss. Capital expenditure
amounts not deducted are carried forward as unredeemed capital expenditure to be deducted from future mining income. Accounting depreciation is ignored for the
purpose of calculating South African mining taxation.
The mining tax rate used for deferred tax purposes for Gold Fields Operations Limited (GFO) and GFI Joint Venture Holdings (Proprietary) Limited (GFIJVH), owners of the
South Deep mine, has been calculated at 30% (2025: 29%).
During the period ended 30 June 2026, GFO fully utilised its available assessed mining losses and unredeemed capital expenditure, resulting in an effective mining tax rate
of 24% as determined by the gold mining tax formula.
In the formula above, Y is the percentage rate of tax payable and X is the ratio of mining profit, after the deduction of redeemable capital expenditure, to mining revenue
expressed as a percentage.
Non-mining income of South African mining operations consists primarily of interest income. The corporate income tax rate is 27%.
Deferred tax is provided at the expected future rate for mining operations arising from temporary differences between the carrying values and tax values of assets and
liabilities. In South Africa the tax rate which has been used for deferred tax purposes for mining assets is Y = 33 – 165/X and for non-mining assets is 27%.
Discontinued operation
The Damang mine was transferred to the Government of Ghana on 18 April 2026, following the expiry of the 12-month mining lease granted to
Gold Fields in April 2025
On 18 April 2026, Damang qualified as an abandoned asset and the financial results of Damang have been presented as a discontinued
operation in the consolidated financial statements. The comparative income statement and statement of cash flows have been presented as if
Damang had been discontinued from the start of the comparative period.
Below is a summary of the results of the discontinued operation:
United States Dollar
Six months ended
Figures in millions unless otherwise stated
28
June 2026
June 2025
Revenue
109.4
159.8
Cost of sales
(96.1)
(107.3)
Rehabilitation expense
(11.1)
—
Other costs, net
(3.4)
(2.1)
Profit before royalties, taxation and non-recurring items
(1.2)
50.4
Royalties
(5.5)
(8.0)
(Loss)/profit before taxation
(6.7)
42.4
Mining and income taxation
(11.9)
(13.6)
Normal taxation
(1.8)
(16.0)
Deferred taxation
(10.1)
2.4
(Loss)/profit from discontinued operation, net of tax
(18.6)
28.8
GOLD FIELDS H1 Results 2026
Notes to the condensed consolidated financial statements continued
United States Dollar
Six months ended
Figures in millions unless otherwise stated
Earnings per share
10.1
Basic earnings per share – cents
June 2026
June 2025
207
115
209
112
(2)
3
206
114
1,854.6
1,026.7
Basic earnings per share is calculated by dividing the profit attributable to owners of the parent of
US$1,854.6m (2025: US$1,026.7m) by the weighted average number of ordinary shares in issue during
the period of 893,786,404 (2025: 895,024,247).
10.2
Basic earnings per share from continuing operations – cents
Basic earnings per share from continuing operations is calculated by dividing the profit attributable to
owners of the parent from continuing operations of US$1,871.3m (2025: US$1,000.8m) by the weighted
average number of ordinary shares in issue during the period of 893,786,404 (2025: 895,024,247).
10.3
Basic (loss)/earnings per share from discontinued operation – cents
Basic (loss)/earnings per share from discontinued operation is calculated by dividing the (loss)/profit
attributable to owners of the parent from discontinued operation of US$16.7m (2025: US$25.9m) by the
weighted average number of ordinary shares in issue during the period of 893,786,404 (2025:
895,024,247).
10.4
Diluted earnings per share – cents
Diluted earnings per share is calculated by dividing the diluted profit attributable to owners of the
parent of US$1,846.6m (2025: US$1,017.4m) by the diluted weighted average number of ordinary shares
in issue during the period of 896,242,607 (2025: 895,704,080).
Net profit attributable to owners of the parent has been adjusted by the following to arrive at the diluted
profit attributable to owners of the parent:
Profit attributable to owners of the parent
South Deep minority interest at 10%
Diluted profit attributable to owners of the parent
(8.0)
(9.3)
1,846.6
1,017.4
893,786,404
895,024,247
The weighted average number of shares has been adjusted by the following to arrive at the diluted
number of ordinary shares:
Weighted average number of ordinary shares
Share options in issue
2,456,203
679,833
896,242,607
895,704,080
208
111
1,871.3
1,000.8
(8.0)
(9.3)
Diluted profit attributable to owners of the parent from continuing operations
1,863.3
991.5
Diluted (loss)/earnings per share from discontinued operation – cents
(2)
3
208
115
Diluted weighted average number of ordinary shares
10.5
Diluted earnings per share from continuing operations – cents
Diluted earnings per share from continuing operations is calculated by dividing the diluted profit
attributable to owners of the parent from continuing operations of US$1,863.3m (2025: US$991.5m) by
the diluted weighted average number of ordinary shares in issue during the period of 896,242,607
(2025: 895,704,080).
Net profit attributable to owners of the parent from continuing operations has been adjusted by the
following to arrive at the diluted profit attributable to owners of the parent:
Profit attributable to owners of the parent from continuing operations
South Deep minority interest at 10%
10.6
Diluted (loss)/earnings per share from discontinued operation is calculated by dividing the diluted (loss)/
profit attributable to owners of the parent from discontinued operation of US$16.7m (2025: US$25.9m)
by the diluted weighted average number of ordinary shares in issue during the period of 896,242,607
(2025: 895,704,080).
10.7
Headline earnings per share – cents
Headline earnings per share is calculated by dividing headline earnings of US$1,854.7m
(2025: US$1,027.3m) by the weighted average number of ordinary shares in issue during the period of
893,786,404 (2025: 895,024,247).
29
GOLD FIELDS H1 Results 2026
Notes to the condensed consolidated financial statements continued
United States Dollar
Six months ended
Figures in millions unless otherwise stated
Earnings per share continued
10.7
Headline earnings per share – cents continued
June 2026
June 2025
1,854.6
1,026.7
Net profit attributable to owners of the parent is reconciled to headline earnings as follows:
Long-form headline earnings reconciliation
Profit attributable to owners of the parent
Profit on disposal of assets, net
(0.4)
(0.4)
Gross
(0.5)
(0.6)
Taxation effect
0.1
0.2
Impairment of assets and other
0.5
1.0
Impairment of assets
0.5
0.1
Other
—
0.9
1,854.7
1,027.3
210
112
Headline earnings
10.8
Headline earnings per share from continuing operations – cents
Headline earnings per share from continuing operations is calculated by dividing headline earnings
from continuing operations of US$1,871.6m (2025: US$1,001.4m) by the weighted average number of
ordinary shares in issue during the period of 893,786,404 (2025: 895,024,247).
Net profit attributable to owners of the parent from continuing operations is reconciled to headline
earnings from continuing operations as follows:
Long-form headline earnings reconciliation
Profit attributable to owners of the parent from continuing operations
1,871.3
1,000.8
Profit on disposal of assets, net
(0.2)
(0.4)
Gross
(0.2)
(0.6)
Taxation effect
—
0.2
Impairment of assets and other
0.5
1.0
Impairment of assets
0.5
0.1
Other
—
0.9
1,871.6
1,001.4
(2)
3
(Loss)/profit attributable to owners of the parent from continuing operations
(16.7)
25.9
Profit on disposal of assets, net
(0.2)
—
Gross
(0.3)
—
Taxation effect
0.1
—
Headline (loss)/earnings from continuing operations
(16.9)
25.9
Diluted headline earnings per share – cents
206
114
1,854.7
1,027.3
(8.0)
(9.3)
1,846.7
1,018.0
Headline earnings from continuing operations
10.9
Headline (loss)/earnings per share from discontinued operation – cents
Headline (loss)/earnings per share from discontinued operation is calculated by dividing headline (loss)/
earnings from discontinued operation of US$16.9m (2025: US$25.9m) by the weighted average number
of ordinary shares in issue during the period of 893,786,404 (2025: 895,024,247).
Long-form headline (loss)/earnings reconciliation
10.10
Diluted headline earnings per share is calculated by dividing headline earnings of US$1,846.7m
(2025: US$1,018.0m) by the weighted average number of ordinary shares in issue during the period of
896,242,607 (2025: 895,704,080).
Headline earnings has been adjusted by the following to arrive at dilutive headline earnings:
Headline earnings
South Deep minority interest at 10%
Diluted headline earnings
30
GOLD FIELDS H1 Results 2026
Notes to the condensed consolidated financial statements continued
United States Dollar
Six months ended
Figures in millions unless otherwise stated
Earnings per share continued
10.11
Diluted headline earnings per share form continuing operations – cents
June 2026
June 2025
208
111
1,871.6
1,001.4
Diluted headline earnings per share from continuing operations is calculated by dividing headline
earnings from continuing operations of US$1,863.6m (2025: US$992.1m) by the weighted average
number of ordinary shares in issue during the period of 896,242,607 (2025: 895,704,080).
Headline earnings from continuing operations has been adjusted by the following to arrive at dilutive
headline earnings from continuing operations:
Headline earnings from continuing operations
South Deep minority interest at 10%
Diluted headline earnings from continuing operations
10.12
Diluted headline (loss)/earnings per share form discontinued operation – cents
(8.0)
(9.3)
1,863.6
992.1
(2)
3
1,920.9
1,027.5
1,183.8
565.0
Diluted headline (loss)/earnings per share from discontinued operation is calculated by dividing
headline (loss)/earnings from discontinued of US$16.9m (2025: US$25.9m) by the weighted average
number of ordinary shares in issue during the period of 896,242,607 (2025: 895,704,080).
Cash generated by operations
Profit from continuing operations
Adjusted for non-cash items:
– Mining and income taxation
– Royalties
139.3
89.1
– Amortisation and depreciation
629.0
361.3
– Interest expense – environmental rehabilitation
14.6
13.1
– Interest received – environmental trust funds
(2.3)
(2.4)
– Impairment of assets
0.5
0.1
– Profit on disposal of assets
(0.2)
(0.6)
– Unwinding of discount rate/net change in fair value of Asanko deferred and contingent considerations
(1.9)
(2.9)
– Share-based payments
20.2
9.4
– Long-term incentive plan expense
6.0
14.5
– Borrowing costs capitalised
—
(52.7)
– Share of results of equity-accounted investees, net of taxation
(1.0)
1.3
– Gold Road stamp duty
85.8
—
– Royalties - fair value gain (refer note 12)
(37.5)
—
– Other non-cash items
33.8
(13.5)
95.2
80.8
Adjusted for cash items:
– Interest expense
– Interest received
(29.7)
(14.0)
– Payment of long-term incentive plan
(46.5)
(32.7)
– Environmental rehabilitation payments
Cash generated by operations
31
GOLD FIELDS H1 Results 2026
(2.3)
(4.6)
4,007.7
2,038.7
Notes to the condensed consolidated financial statements continued
United States Dollar
Six months ended
June 2026
December 2025
Royalties
—
77.5
Assets held for sale
—
77.5
Figures in millions unless otherwise stated
Assets held for sale
On 12 December 2025, Gold Fields entered into agreements to sell a portfolio of royalty assets for a total cash consideration of US$115.0m
and its right to the Asanko deferred and contingent considerations for US$30.0m and US$22.0m, respectively.
Certain assets within the royalty portfolio, having a combined a value of US$77.5m, were subject to a third-party right of first refusal (“ROFR”).
Completion of the overall transaction was conditional upon the purchaser acquiring these royalties.
At 31 December 2025, the US$77.5m royalties were presented as assets held for sale as the sale was considered highly probable in the
sense that they will be purchased either by the purchaser or the third party.
At that date, the outcome of the ROFR was unknown and no evidence existed that the sale of the remaining royalty portfolio amounting to
US$37.5m or the deferred and contingent considerations were highly probably and therefore they were not recognised as held for sale.
The third party was given until 13 January 2026 to exercise its ROFR, which they declined. As a result, the sale of the remaining royalty
portfolio and the Asanko deferred and contingent considerations become unconditional. On this date, a fair value gain of US$37.5m was
recognised through profit or loss.
The transaction concluded in Q2 2026 with the receipt of US$115.0m and US$52.0m, respectively, for the sale of the royalty portfolio and the
Asanko deferred and contingent considerations.
Figures in millions unless otherwise stated
31 Dec 2027
31 Dec 2028
31 Dec 2029
31 Dec 2030
31 Dec 2032
Total
Debt maturity ladder
Committed loan facilities
US Dollar debt
100.0
83.3
548.5
1,066.7
743.7
2,542.2
Rand debt
—
2,500.0
—
—
—
2,500.0
A$ Dollar debt
—
500.0
—
1,250.0
—
1,750.0
Rand debt translated to US Dollar
—
152.5
—
—
—
152.5
A$ Dollar debt translated to US Dollar
—
345.9
—
864.9
—
1,210.8
100.0
581.7
548.5
1,931.6
743.7
3,905.5
US Dollar debt
—
4.7
501.3
—
743.7
1,249.7
A$ Dollar debt
—
—
—
1,250.0
—
1,250.0
C$ Dollar debt*
—
—
—
85.3
—
85.3
A$ Dollar debt translated to US Dollar
—
—
—
864.9
—
864.9
C$ Dollar debt translated to US Dollar*
—
—
—
60.1
—
60.1
Total (US$m)
—
4.7
501.3
925.0
743.7
2,174.7
Total (US$m)
Committed loan facilities - utilisation
Exchange rate: US$1.00 = R16.39 and A$1.00 = US$0.69 and C$1.00 = US$0.70 being the closing rates at 30 June 2026.
- The US$1,200m RCF facility is a multi-currency (US$ and C$) facility.
32
GOLD FIELDS H1 Results 2026
Notes to the condensed consolidated financial statements continued
14.
Fair value hierarchy
The Group has the following hierarchy for measuring the fair value of assets and liabilities at the reporting date:
Level 1: Unadjusted quoted prices in active markets for identical assets or liabilities;
Level 2: Inputs other than quoted prices in level 1 that are observable for the asset or liability, either directly (as prices) or indirectly (derived
from prices); and
Level 3: Inputs for the asset or liability that are not based on observable market data (unobservable inputs).
The Group recognises transfers between levels of the fair value hierarchy at the end of the reporting period during which the change has
occurred. There were no transfers during the period ended 30 June 2026 and year ended 31 December 2025.
The following table sets out the Group's financial assets and financial liabilities by level within the fair value hierarchy at the reporting date:
United States Dollar
30 June 2026
Total
Figures in millions unless otherwise stated
31 December 2025
Level 1
Level 2
Level 3
Total
Level 1
Level 2
Level 3
Financial assets measured at fair value
Trade receivables from provisional copper
sales
8.8
—
8.8
—
31.0
—
31.0
—
126.6
126.6
—
—
142.4
142.4
—
—
Asanko contingent consideration
—
—
—
—
22.0
—
—
22.0
Royalties - asset held for sale
—
—
—
—
77.5
—
—
77.5
Investments – listed
Financial assets not measured at fair value
Environmental trust funds
190.0
—
190.0
—
140.9
—
140.9
—
Other investments - mainly bonds
47.9
47.9
—
—
47.2
47.2
—
—
Asanko deferred consideration
—
—
—
—
28.1
—
28.1
—
2,204.0
932.5
—
1,271.5
2,806.3
1,309.6
—
1,496.7
Financial liabilities not measured at fair
value
Borrowings
Trade receivables from provisional copper sales
Valued using quoted market prices based on the forward London Metal Exchange (LME) and, as such, classified within level 2 of the fair value
hierarchy.
Investments – listed
Comprise equity investments in listed entities and therefore valued using quoted market prices in active markets.
Royalties - asset held for sales
The royalties are measured at fair value. The fair value is based on the expected cash flows of the consideration receivable in terms of the
contract. Refer note 12 for further details.
Asanko contingent and deferred considerations
The contingent consideration is measured at fair value and the deferred consideration is measured at amortised cost. The values of the
considerations are based on the expected cash flows of the consideration receivable. The key inputs used in the valuations are the
contractually agreed periods and the discount rates. Refer note 12 for further details.
Environmental trust funds
The trust funds consist of term deposits in South Africa as well as secured cash deposits in Ghana. The environmental trust funds are
measured at amortised cost which approximates fair value based on the nature of the fund’s underlying investments.
Other investments – mainly bonds
Comprise listed bonds and unlisted investments and warrants that are measured at amortised cost which approximates fair value. The fair
value of the bonds is determined using quoted market prices in active markets.
Borrowings
The 10-year notes and 7-year notes (2025: five-year notes and 10-year notes) are issued at a fixed interest rate. The fair values of these notes
are based on listed market prices and are classified within level 1 of the fair value hierarchy. The fair value of the remaining borrowings
approximates their carrying amount, determined using the discounted cash flow method using market related interest rates and are classified
within level 3 of the fair value hierarchy.
33
GOLD FIELDS H1 Results 2026
Notes to the condensed consolidated financial statements continued
15.
Capital commitments
United States Dollar
Figures in millions unless otherwise stated
June 2026
Dec 2025
409.4
221.3
Commitments
Capital expenditure
Contracted for1
1
Contracted for capital expenditure includes US$55.1m (2025: US$86.0m) for Salares Norte, US$30.9m (2025: US$nil) relating to the Wallaby Enabling Infrastructure Project at
Granny Smith and US$59.4m (2025: US$nil) relating to the Invincible Material handing system project at St Ives.
Events after the reporting date
Interim dividend
On 25 August 2026, Gold Fields declared a final dividend of 1,625 SA cents per share.
Shareholder returns
In November 2025, Gold Fields allocated US$500m to additional shareholder returns, increasing this to US$750m in February 2026.
On 25 August 2026, a further US$500m is being allocated to shareholder returns, lifting the additional returns programme to US$1.25b to be
delivered through a combination of special dividends and targeted share buy-backs. Of the US$1.25b programme, US$253m was paid out as
a special dividend in February 2026 while US$300million has been delivered through the share buy-backs, completed in July 2026.
34
GOLD FIELDS H1 Results 2026
Segmental operating and financial results
United States Dollar
Figures in millions unless otherwise stated
Total
Mine
Operations
including
Discontinued
Operations
Total
Mine
Operations
excluding
Discontinued
Operations
South African Rand
Peru
Chile
Ghana
South Africa
Cerro
Corona
Salares
Norte
Project
Tarkwa
South
Deep
South
Deep1
Operating results
Ore milled/treated
(000 tonnes)
June 2026
22,281
20,947
3,186
1,035
7,045
1,470
1,470
June 2025
20,893
18,566
3,276
469
7,441
1,534
1,534
Yield
(grams per tonne)
June 2026
1.8
1.9
0.6
10.1
0.8
3.2
3.2
June 2025
1.7
1.9
0.9
8.2
1.0
3.1
3.1
June 2026
1,298.5
1,276.5
56.9
336.9
191.9
151.0
4,698
Gold produced (000 managed equivalent ounces)
Gold produced (000 attributable equivalent ounces)
June 2025
1,170.7
1,118.9
97.4
123.6
232.9
153.1
4,762
June 2026
1,266.5
1,246.6
56.6
336.9
172.7
140.6
4,374
June 2025
1,136.2
1,089.7
96.9
123.6
209.7
147.6
4,592
Gold sold
(000 managed equivalent ounces)
June 2026
1,291.8
1,269.1
56.0
333.8
192.7
147.2
4,579
June 2025
1,125.8
1,074.1
95.2
123.8
233.8
139.5
4,340
Gold price received
(Dollar per equivalent ounce)
June 2026
4,681
4,678
4,718
4,700
4,634
4,682
2,470,420
June 2025
3,089
3,089
3,198
3,105
3,073
3,081
1,821,525
AISC
(Dollar per ounce)
June 2026
1,878
1,834
1,284
269
2,671
2,169
1,144,353
June 2025
1,666
1,646
319
1,689
2,035
1,770
1,046,434
Total AIC
(Dollar per ounce)
June 2026
1,986
1,945
1,616
338
2,725
2,223
1,173,095
June 2025
1,844
1,833
443
2,328
2,035
1,770
1,046,434
The average US Dollar/Rand exchange rates were US$1 = R16.41 for 2026 and US$1 = R18.39 for 2025
The average Australian/US Dollar exchange rates were A$1 = US$0.70 for 2026 and A$1 = US$0.63 for 2025
1 For South Africa, all financial numbers are in Rand and Rand per kilogram
Figures may not add as they are rounded independently
35
GOLD FIELDS H1 Results 2026
Segmental operating and financial results continued
Figures in millions unless otherwise stated
Agnew
United States Dollar
Australian Dollar
United States
Dollar
Australia
Australia2
Discontinued
St Ives
Granny
Smith
Gruyere3
Agnew
St Ives
Granny
Smith
Gruyere3
Damang
Operating results
Ore milled/treated (000 tonnes)
Yield (grams per tonne)
Gold produced (000 managed equivalent ounces)
Gold produced (000 attributable equivalent ounces)
Gold sold (000 managed equivalent ounces)
June 2026
624
2,165
770
4,652
624
2,165
770
4,652
1,333
June 2025
598
2,294
705
2,249
598
2,294
705
2,249
2,327
June 2026
5.1
2.4
6.0
0.8
5.1
2.4
6.0
0.8
0.5
June 2025
6.3
2.5
5.9
1.0
6.3
2.5
5.9
1.0
0.7
June 2026
102.8
169.8
147.4
119.7
102.8
169.8
147.4
119.7
22.1
June 2025
121.5
184.5
133.8
72.1
121.5
184.5
133.8
72.1
51.7
June 2026
102.8
169.8
147.4
119.7
102.8
169.8
147.4
119.7
19.9
June 2025
121.5
184.5
133.8
72.1
121.5
184.5
133.8
72.1
46.5
June 2026
102.6
169.8
144.3
122.7
102.6
169.8
144.3
122.7
22.7
June 2025
112.5
168.7
128.7
71.9
112.5
168.7
128.7
71.9
51.7
June 2026
4,653
4,712
4,670
4,647
6,623
6,706
6,646
6,614
4,823
June 2025
3,042
3,080
3,080
3,099
4,797
4,856
4,856
4,887
3,091
AISC
(Dollar per ounce)
June 2026
2,231
2,283
1,787
3,081
3,175
3,249
2,543
4,385
4,166
June 2025
1,373
1,627
1,506
1,878
2,165
2,565
2,374
2,961
2,070
Total AIC
(Dollar per ounce)
June 2026
2,391
2,653
1,816
3,088
3,403
3,775
2,585
4,394
4,166
June 2025
1,637
2,072
1,537
1,878
2,581
3,267
2,423
2,961
2,070
Gold price received (Dollar per equivalent ounce)
The average US Dollar/Rand exchange rates were US$1 = R16.41 for 2026 and US$1 = R18.39 for 2025
The average Australian/US Dollar exchange rates were A$1 = US$0.70 for 2026 and A$1 = US$0.63 for 2025
2 For Australia, all financial numbers are in Australian Dollar
3 Results are reported on a 50% basis up to the acquisition of Gold Road on 26 September 2025, and on a 100% basis from that date forward
Figures may not add as they are rounded independently
36
GOLD FIELDS H1 Results 2026
United States Dollar
Total Mine
Operations
including
Discontinued
Operations
Total Mine
Operations
excluding
Discontinued
Operations
June 2026
6,046.3
June 2025
3,477.8
June 2026
(1,767.5)
Figures in millions unless otherwise stated
Peru
South African Rand
Chile
Ghana
South Africa
Cerro
Corona
Salares Norte
Tarkwa
South
Deep
South
Deep1
5,936.9
264.0
1,568.9
893.0
689.4
11,313.1
3,318.0
304.5
384.4
718.3
429.9
7,904.7
(1,678.8)
(129.8)
(188.3)
(303.9)
(230.6)
(3,784.2)
Financial results (US$ millions)
Revenue
Cost of sales before amortisation and depreciation
Cost of sales before gold
inventory change and
amortisation and depreciation
– Salaries and wages
– Consumable stores
– Utilities
– Mine contractors
– Other
– Gold inventory change
Amortisation of mining assets
Other expenses
Profit before royalties and taxation
Royalties, mining and
income taxation
– Normal taxation
– Royalties
– Deferred taxation
Profit before non-recurring items
Non-recurring items
Net profit
Capital expenditure
June 2025
(1,199.6)
(1,107.8)
(91.8)
(63.5)
(307.4)
(179.5)
(3,300.8)
June 2026
(1,695.8)
(1,609.4)
(102.9)
(246.3)
(252.3)
(231.8)
(3,803.9)
June 2025
(1,223.3)
(1,166.0)
(124.9)
(68.6)
(258.1)
(196.2)
(3,607.5)
June 2026
(292.2)
(284.2)
(31.3)
(27.3)
(31.1)
(74.1)
(1,216.0)
June 2025
(237.1)
(227.3)
(31.4)
(11.4)
(30.1)
(63.1)
(1,161.0)
June 2026
(277.0)
(261.2)
(13.1)
(46.2)
(52.1)
(65.3)
(1,071.8)
June 2025
(203.7)
(187.4)
(14.4)
(6.4)
(49.1)
(58.1)
(1,068.0)
June 2026
(114.4)
(107.6)
(9.3)
(3.5)
(11.9)
(29.9)
(490.3)
June 2025
(87.3)
(79.7)
(7.5)
(0.4)
(12.5)
(24.4)
(448.8)
June 2026
(647.2)
(599.8)
(30.0)
(129.2)
(138.3)
(33.7)
(553.0)
June 2025
(433.3)
(415.9)
(59.0)
(4.6)
(138.3)
(26.1)
(479.8)
June 2026
(364.6)
(356.4)
(19.2)
(40.0)
(28.1)
(28.8)
(472.8)
(449.8)
June 2025
(261.7)
(255.6)
(12.7)
(45.8)
(28.1)
(24.5)
June 2026
(71.7)
(69.3)
(26.9)
58.0
(51.5)
1.2
19.7
June 2025
23.7
58.1
33.1
5.0
(49.3)
16.7
306.6
June 2026
(590.8)
(583.5)
(20.9)
(224.2)
(45.9)
(46.5)
(763.6)
June 2025
(362.3)
(346.8)
(43.6)
(20.1)
(56.9)
(36.2)
(664.9)
June 2026
(97.8)
(96.5)
(12.5)
(20.4)
(25.0)
(1.6)
(26.2)
June 2025
(67.1)
(64.9)
(10.9)
(6.9)
(5.1)
(1.7)
(31.9)
June 2026
3,590.2
3,578.1
100.8
1,136.0
518.2
410.7
6,739.1
June 2025
1,848.9
1,798.5
158.2
293.9
348.9
212.5
3,907.1
June 2026
(1,294.3)
(1,276.9)
(73.9)
(389.0)
(201.0)
(145.9)
(2,393.9)
June 2025
(640.0)
(618.5)
(64.2)
(90.3)
(135.8)
(68.2)
(1,254.5)
June 2026
(616.3)
(614.4)
(97.0)
(384.1)
(117.7)
(15.6)
(256.8)
June 2025
(157.7)
(141.7)
(54.5)
(5.7)
(81.3)
(0.2)
(3.6)
June 2026
(144.8)
(139.3)
(5.0)
—
(44.7)
(27.5)
(451.8)
June 2025
(97.2)
(89.2)
(8.1)
—
(35.9)
(7.7)
(141.7)
June 2026
(533.3)
(523.2)
28.2
(4.9)
(38.7)
(102.7)
(1,685.3)
June 2025
(385.2)
(387.6)
(1.6)
(84.6)
(18.5)
(60.3)
(1,109.3)
June 2026
2,295.9
2,301.2
26.9
747.0
317.2
264.8
4,345.2
June 2025
1,208.9
1,180.1
94.0
203.6
213.1
144.3
2,652.6
June 2026
(20.7)
(7.5)
(0.7)
(0.8)
(1.2)
(0.9)
(14.0)
June 2025
(10.4)
(10.4)
(0.1)
1.3
(2.3)
0.6
11.1
June 2026
2,275.1
2,293.7
26.2
746.2
316.0
263.9
4,331.2
2,663.7
June 2025
1,198.5
1,169.7
94.0
204.9
210.8
144.9
June 2026
(702.5)
(702.5)
(5.9)
(46.9)
(168.6)
(60.1)
(986.1)
June 2025
(658.0)
(660.6)
(4.5)
(210.4)
(118.2)
(50.6)
(930.4)
The average US Dollar/Rand exchange rates were US$1 = R16.41 for 2026 and US$1 = R18.39 for 2025
The average Australian/US Dollar exchange rates were A$1 = US$0.70 for 2026 and A$1 = US$0.63 for 2025
1 For South Africa, all financial numbers are in Rand and Rand per kilogram
Figures may not add as they are rounded independently
37
GOLD FIELDS H1 Results 2026
United States Dollar
Australian Dollar
United
States Dollar
Australia2
Discontinued
Australia
Total
Agnew
St Ives
Granny
Smith
June 2026
2,521.6
477.5
800.1
June 2025
1,480.9
342.3
519.6
Cost of sales before amortisation and
depreciation
June 2026
(826.2)
(164.6)
June 2025
(465.7)
Cost of sales before gold inventory
change and amortisation and depreciation
June 2026
June 2025
Figures in millions unless otherwise stated
Granny
Smith
Gruyere3
Damang
Gruyere3
Total
Agnew
St Ives
673.9
570.1
3,588.9
679.7
1,138.7
959.1
811.4
109.4
396.3
222.7
2,335.3
539.7
819.4
624.9
351.3
159.8
(293.3)
(161.3)
(207.1)
(1,175.7)
(234.2)
(417.3)
(229.5)
(294.7)
(88.7)
(113.0)
(172.5)
(115.7)
(64.5)
(734.1)
(178.2)
(271.9)
(182.4)
(101.7)
(91.8)
(776.1)
(160.1)
(298.9)
(153.8)
(163.2)
(1,104.4)
(227.8)
(425.4)
(218.9)
(232.3)
(86.4)
(518.3)
(120.5)
(203.2)
(122.9)
(71.6)
(817.0)
(190.0)
(320.4)
(193.8)
(112.9)
(57.3)
June 2026
(120.5)
(25.0)
(35.2)
(44.6)
(15.7)
(171.3)
(35.5)
(50.1)
(63.4)
(22.3)
(8.0)
June 2025
(91.3)
(21.7)
(25.3)
(37.8)
(6.5)
(143.8)
(34.2)
(39.8)
(59.6)
(10.2)
(9.8)
June 2026
(84.4)
(16.0)
(26.8)
(18.8)
(22.8)
(120.2)
(22.8)
(38.1)
(26.8)
(32.5)
(15.8)
Financial results (US$ millions)
Revenue
– Salaries and wages
– Consumable stores
– Utilities
– Mine contractors
– Other
– Gold inventory change
Amortisation of mining assets
Other expenses
Profit before royalties and taxation
Royalties, mining and income taxation
– Normal taxation
– Royalties
– Deferred taxation
Profit/(loss) before non-recurring items
Non-recurring items
Net profit/(loss)
Capital expenditure
June 2025
(59.5)
(11.0)
(21.7)
(16.5)
(10.3)
(93.8)
(17.3)
(34.2)
(26.0)
(16.3)
(16.2)
June 2026
(53.1)
(5.3)
(16.9)
(12.0)
(18.9)
(75.5)
(7.5)
(24.0)
(17.1)
(26.9)
(6.9)
June 2025
(35.0)
(3.9)
(14.1)
(9.8)
(7.2)
(55.3)
(6.2)
(22.3)
(15.4)
(11.4)
(7.5)
June 2026
(280.9)
(68.0)
(156.1)
(22.4)
(34.4)
(399.8)
(96.7)
(222.2)
(31.9)
(49.0)
(47.4)
June 2025
(188.0)
(52.2)
(96.7)
(18.7)
(20.4)
(296.1)
(82.2)
(152.4)
(29.4)
(32.1)
(17.4)
June 2026
(237.1)
(45.8)
(63.9)
(55.9)
(71.5)
(337.7)
(65.3)
(91.0)
(79.7)
(101.7)
(8.2)
June 2025
(144.5)
(31.7)
(45.4)
(40.2)
(27.2)
(227.9)
(50.0)
(71.6)
(63.4)
(42.9)
(6.4)
June 2026
(50.1)
(4.5)
5.7
(7.4)
(43.9)
(71.3)
(6.4)
8.1
(10.6)
(62.4)
(2.4)
7.5
30.7
7.2
7.1
82.9
11.8
48.5
11.4
11.2
(34.5)
June 2025
52.6
June 2026
(246.0)
(350.0)
(7.3)
June 2025
(190.0)
(299.5)
(15.5)
June 2026
(37.0)
(52.7)
(1.4)
June 2025
(40.3)
(63.5)
(2.2)
June 2026
1,412.4
2,010.4
12.1
June 2025
785.0
1,238.1
50.4
June 2026
(467.1)
(664.7)
(17.4)
June 2025
(260.0)
(409.8)
(21.6)
June 2026
—
—
(1.8)
June 2025
—
—
(16.0)
June 2026
(62.1)
(88.3)
(5.5)
June 2025
(37.4)
(59.0)
(8.0)
June 2026
(405.0)
(576.4)
(10.1)
June 2025
(222.5)
(350.8)
2.4
June 2026
945.3
1,345.7
(5.3)
June 2025
525.0
828.3
28.8
June 2026
(4.0)
(5.7)
(13.2)
June 2025
(9.9)
(15.6)
—
June 2026
941.3
1,340.0
(18.6)
June 2025
515.1
June 2026
(421.1)
(47.5)
(123.2)
(73.2)
(177.2)
(599.2)
812.7
(67.6)
(175.3)
(104.1)
(252.2)
28.8
—
June 2025
(276.9)
(42.8)
(121.2)
(57.0)
(55.8)
(436.5)
(67.5)
(191.1)
(89.9)
(88.0)
2.7
The average Australian/US Dollar exchange rates were A$1 = US$0.70 for 2026 and A$1 = US$0.63 for 2025
2 For Australia, all financial numbers are in Australian Dollar
3 Results are reported on a 50% basis up to the acquisition of Gold Road on 26 September 2025, and on a 100% basis from that date forward
Figures may not add as they are rounded independently
38
GOLD FIELDS H1 Results 2026
All-in cost
World Gold Council Industry Standard
United States Dollar
Total Group
Total
Mine
Operations
including
Discontinued
Operations
Total
Mine
Operations
excluding
Discontinued
Operations
June 2026
(1,695.8)
(1,695.8)
June 2025
(1,223.3)
June 2026
Peru
Chile
Ghana
South Africa
Cerro
Corona
Salares Norte
Tarkwa
South Deep
(1,609.4)
(102.9)
(246.3)
(252.3)
(231.8)
(1,223.3)
(1,166.0)
(124.9)
(68.6)
(258.1)
(196.2)
(41.8)
(41.8)
(39.4)
(28.5)
15.3
(23.8)
1.0
June 2025
8.4
8.4
42.8
27.8
4.1
(37.2)
12.9
June 2026
(144.8)
(144.8)
(139.3)
(5.0)
—
(44.7)
(27.5)
June 2025
(97.2)
(97.2)
(89.2)
(8.1)
—
(35.9)
(7.7)
Community/social
responsibility costs
June 2026
(15.6)
(15.6)
(15.3)
(4.7)
—
(7.4)
(3.2)
June 2025
(10.6)
(10.6)
(9.9)
(2.7)
—
(5.0)
(2.2)
Non-cash remuneration –
share-based payments
June 2026
(19.2)
(11.6)
(11.6)
(1.5)
(1.2)
(1.8)
(2.7)
June 2025
(9.2)
(5.8)
(5.8)
(0.9)
(0.5)
(0.9)
(1.1)
Cash remuneration
(long-term incentive plan)
June 2026
(6.0)
(3.8)
(3.8)
(1.0)
—
(1.3)
(3.9)
Figures in millions unless otherwise stated
Cost of sales before gold inventory change and
amortisation and depreciation
Gold inventory change (cash)
Royalties
Other
By-product credits
Rehabilitation amortisation
and interest
Sustaining capital expenditure
Lease payments
Exploration, feasibility
and evaluation costs
AISC
June 2025
(14.6)
(12.0)
(11.5)
(1.9)
(0.8)
(2.1)
(2.5)
June 2026
(5.7)
—
—
—
—
—
—
June 2025
(9.3)
—
—
—
—
—
—
June 2026
326.7
326.7
326.6
119.0
201.1
0.9
0.8
June 2025
120.7
120.7
120.6
109.0
8.6
0.9
0.5
June 2026
(29.2)
(29.2)
(29.2)
(13.6)
(5.3)
(2.3)
—
June 2025
(30.1)
(30.1)
(26.1)
(15.2)
(1.1)
(3.5)
—
June 2026
(608.9)
(607.1)
(607.1)
(0.4)
(36.2)
(158.3)
(52.1)
June 2025
(502.8)
(502.0)
(504.7)
(0.9)
(143.6)
(118.2)
(50.6)
June 2026
(75.1)
(73.7)
(73.7)
(0.8)
(5.6)
(21.9)
—
June 2025
(58.6)
(57.6)
(53.9)
(0.9)
(2.4)
(15.8)
—
June 2026
(2.8)
(2.8)
(2.8)
(0.8)
—
(2.0)
—
June 2025
(1.3)
(1.3)
(0.1)
(0.1)
—
—
—
June 2026
(2,318.3)
(2,299.5)
(2,205.0)
(40.2)
(78.3)
(514.8)
(319.3)
June 2025
(1,827.8)
(1,810.7)
(1,703.7)
(18.8)
(204.3)
(475.8)
(247.0)
June 2026
(1.0)
—
—
—
—
—
—
June 2025
(0.3)
—
—
—
—
—
—
June 2026
—
—
—
—
—
—
—
June 2025
—
—
—
—
—
—
—
June 2026
(7.1)
—
—
—
—
—
—
June 2025
(4.6)
—
—
—
—
—
—
Exploration, feasibility
and evaluation costs
June 2026
(176.4)
(37.9)
(37.9)
(4.9)
(9.6)
—
—
June 2025
(132.5)
(37.6)
(37.6)
(3.7)
(10.7)
—
—
Non-sustaining capital
expenditure
June 2026
(100.1)
(95.3)
(95.3)
(5.5)
(10.6)
(10.3)
(8.0)
Non-cash remuneration –
share-based payments
Cash remuneration (long-term incentive plan)
Lease payments
Total AIC
June 2025
(161.9)
(155.9)
(155.9)
(3.6)
(66.8)
—
—
June 2026
(2,603.0)
(2,432.8)
(2,338.2)
(50.6)
(98.5)
(525.1)
(327.4)
(247.0)
June 2025
(2,127.1)
(2,004.3)
(1,897.3)
(26.2)
(281.8)
(475.8)
June 2026
(2,318.3)
(2,299.5)
(2,205.0)
(40.2)
(78.3)
(514.8)
(319.3)
June 2025
(1,827.8)
(1,810.7)
(1,703.7)
(18.8)
(204.3)
(475.8)
(247.0)
Gold only ounces sold
– (000 ounces)
June 2026
1,224.7
1,224.7
1,202.0
31.3
291.3
192.7
147.2
June 2025
1,086.9
1,086.9
1,035.2
59.1
121.0
233.8
139.5
AISC per ounce of gold sold
US$/oz
June 2026
1,893
1,878
1,834
1,284
269
2,671
2,169
Total AISC
Total AIC
Gold only ounces sold
– (000 ounces)
AIC per ounce of gold sold US$/oz
39
GOLD FIELDS H1 Results 2026
June 2025
1,682
1,666
1,646
319
1,689
2,035
1,770.02
June 2026
(2,603.0)
(2,432.8)
(2,338.2)
(50.6)
(98.5)
(525.1)
(327.4)
June 2025
(2,127.1)
(2,004.3)
(1,897.3)
(26.2)
(281.8)
(475.8)
(247.0)
June 2026
1,224.7
1,224.7
1,202.0
31.3
291.3
192.7
147.2
June 2025
1,086.9
1,086.9
1,035.2
59.1
121.0
233.8
139.5
June 2026
2,125
1,986
1,945
1,616
338
2,725
2,223
June 2025
1,957
1,844
1,833
443
2,328
2,035
1,770
All-in cost continued
World Gold Council Industry Standard
Australia
Gold inventory change (cash)
Royalties
Community/social responsibility costs
Non-cash remuneration – share-based payments
Cash remuneration (long-term incentive plan)
Other
By-product credits
Rehabilitation amortisation
and interest
Sustaining capital expenditure
Lease payments
Exploration, feasibility
and evaluation costs
AISC
Non-cash remuneration – share-based payments
Cash remuneration (long-term incentive plan)
Lease payments
Exploration, feasibility and evaluation costs
Non-sustaining capital expenditure
Total AIC
Total AISC
Gold only ounces sold – (000 ounces)
AISC per ounce of gold sold US$/oz
Total AIC
Gold only ounces sold – (000 ounces)
AIC per ounce of gold sold US$/oz
1
St Ives
Granny Smith
June 2026
(160.1)
(298.9)
(153.8)
(163.2)
—
(86.4)
June 2025
(120.5)
(203.2)
(122.9)
(71.6)
—
(57.3)
June 2026
(2.7)
14.2
(4.7)
(10.4)
—
(2.4)
June 2025
7.1
17.1
6.0
5.0
—
(34.5)
June 2026
(11.7)
(19.5)
(16.7)
(14.2)
—
(5.5)
June 2025
(8.5)
(13.1)
(10.3)
(5.5)
—
(8.0)
June 2026
—
—
—
—
—
(0.3)
GOLD FIELDS H1 Results 2026
Damang
June 2025
—
—
—
—
—
(0.7)
June 2026
(1.0)
(1.5)
(1.0)
(0.9)
(7.7)
—
June 2025
(0.6)
(0.8)
(0.7)
(0.4)
(3.4)
—
June 2026
0.6
0.4
1.5
(0.1)
(2.2)
(0.1)
June 2025
(0.8)
(1.6)
(1.3)
(0.4)
(2.6)
(0.5)
June 2026
—
—
—
—
(5.7)
—
June 2025
—
—
—
—
(9.3)
—
June 2026
0.6
1.8
0.2
2.2
—
0.1
0.1
June 2025
0.3
0.7
0.1
0.5
—
June 2026
(1.6)
(3.0)
(1.6)
(1.7)
—
—
June 2025
(1.5)
(2.1)
(1.5)
(1.1)
—
(4.0)
June 2026
(39.5)
(71.2)
(73.0)
(176.5)
(1.8)
—
June 2025
(18.8)
(61.9)
(54.8)
(55.8)
(0.8)
2.7
June 2026
(13.6)
(10.0)
(8.7)
(13.2)
(1.4)
—
June 2025
(11.3)
(9.5)
(8.3)
(5.7)
(1.1)
(3.6)
June 2026
—
—
—
—
—
—
June 2025
—
—
—
—
—
(1.2)
June 2026
(228.9)
(387.6)
(257.9)
(378.0)
(18.8)
(94.5)
June 2025
(154.5)
(274.5)
(193.8)
(135.0)
(17.1)
(107.0)
June 2026
—
—
—
—
(1.0)
—
June 2025
—
—
—
—
(0.3)
—
June 2026
—
—
—
—
—
—
June 2025
—
—
—
—
—
—
June 2026
—
—
—
—
(7.1)
—
June 2025
—
—
—
—
(4.6)
—
June 2026
(8.5)
(10.8)
(4.1)
(0.1)
(138.5)
—
June 2025
(5.6)
(15.8)
(1.8)
—
(94.8)
—
June 2026
(8.0)
(52.0)
(0.2)
(0.8)
(4.8)
—
June 2025
(24.1)
(59.3)
(2.2)
—
(6.0)
—
June 2026
(245.4)
(450.4)
(262.1)
(378.8)
(170.2)
(94.5)
(107.0)
June 2025
(184.2)
(349.6)
(197.8)
(135.0)
(122.8)
June 2026
(228.9)
(387.6)
(257.9)
(378.0)
(18.8)
(94.5)
June 2025
(154.5)
(274.5)
(193.8)
(135.0)
(17.1)
(107.0)
June 2026
102.6
169.8
144.3
122.7
—
22.7
June 2025
112.5
168.7
128.7
71.9
—
51.7
June 2026
2,231
2,283
1,787
3,081
—
4,166
2,070
June 2025
1,373
1,627
1,506
1,878
—
June 2026
(245.4)
(450.4)
(262.1)
(378.8)
(170.2)
(94.5)
June 2025
(184.2)
(349.6)
(197.8)
(135.0)
(122.8)
(107.0)
June 2026
102.6
169.8
144.3
122.7
—
22.7
June 2025
112.5
168.7
128.7
71.9
—
51.7
June 2026
2,391
2,653
1,816
3,088
—
4,166
June 2025
1,637
2,072
1,537
1,878
—
2,070
Results are reported on a 50% basis up to the acquisition of Gold Road on 26 September 2025, and on a 100% basis from that date forward
40
Discontinued
Agnew
Figures in millions unless otherwise stated
Cost of sales before gold inventory change and
amortisation
and depreciation
Corporate
and
projects
Gruyere1
All-in sustaining costs and all-in cost gross of
by-product credits per equivalent ounce of gold sold
World Gold Council Industry Standard
United States Dollar
Figures in millions unless otherwise stated
Total Mine
Operations
excluding
Discontinued
Operations
Peru
Chile
Total
Group
Total Mine
Operations
including
Discontinued
Operations
Cerro
Corona
Salares
Norte
Tarkwa
Ghana
South
Africa
South
Deep
AISC
(per table on page 38)
June 2026
(2,318.3)
(2,299.5)
(2,205.0)
(40.2)
(78.3)
(514.8)
(319.3)
June 2025
(1,827.8)
(1,810.7)
(1,703.7)
(18.8)
(204.3)
(475.8)
(247.0)
Add back by-product
credits
June 2026
(326.7)
(326.7)
(326.6)
(119.0)
(201.1)
(0.9)
(0.8)
June 2025
(120.7)
(120.7)
(120.6)
(109.0)
(8.6)
(0.9)
(0.5)
AISC
gross of by-product
credits
June 2026
(2,645.0)
(2,626.2)
(2,531.6)
(159.2)
(279.3)
(515.7)
(320.1)
June 2025
(1,948.6)
(1,931.4)
(1,824.3)
(127.9)
(212.9)
(476.6)
(247.5)
Gold-equivalent
ounces sold
June 2026
1,291.8
1,291.8
1,269.1
56.0
333.8
192.7
147.2
June 2025
1,125.8
1,125.8
1,074.1
95.2
123.8
233.8
139.5
AISC gross of by-product credits per equivalent ounce of
gold – US$/eq oz
June 2026
2,048
2,033
1,995
2,846
837
2,676
2,174
June 2025
1,731
1,716
1,698
1,343
1,720
2,039
1,774
AIC
(per table on page 38)
June 2026
(2,603.0)
(2,432.8)
(2,338.2)
(50.6)
(98.5)
(525.1)
(327.4)
June 2025
(2,127.1)
(2,004.3)
(1,897.3)
(26.2)
(281.8)
(475.8)
(247.0)
Add back by-product
credits
June 2026
(326.7)
(326.7)
(326.6)
(119.0)
(201.1)
(0.9)
(0.8)
June 2025
(120.7)
(120.7)
(120.6)
(109.0)
(8.6)
(0.9)
(0.5)
AIC gross of
by-product credits
June 2026
(2,929.7)
(2,759.5)
(2,664.9)
(169.7)
(299.5)
(526.0)
(328.2)
June 2025
(2,247.8)
(2,125.0)
(2,017.9)
(135.2)
(290.4)
(476.6)
(247.5)
Gold-equivalent
ounces sold
June 2026
1,291.8
1,291.8
1,269.1
56.0
333.8
192.7
147.2
June 2025
1,125.8
1,125.8
1,074.1
95.2
123.8
233.8
139.5
AIC gross of by-product
credits per equivalent ounce of gold – US$/eq oz
June 2026
2,268
2,136
2,100
3,032
897
2,730
2,229
June 2025
1,997
1,888
1,879
1,420
2,345
2,039
1,774
41
GOLD FIELDS H1 Results 2026
All-in sustaining costs and all-in cost gross of
by-product credits per equivalent ounce of gold sold continued
World Gold Council Industry Standard
United States Dollar
Agnew
St Ives
Granny Smith
Gruyere1
Corporate
and
projects
June 2026
(228.9)
(387.6)
(257.9)
(378.0)
(18.8)
(94.5)
June 2025
(154.5)
(274.5)
(193.8)
(135.0)
(17.1)
(107.0)
June 2026
(0.6)
(1.8)
(0.2)
(2.2)
—
(0.1)
June 2025
(0.3)
(0.7)
(0.1)
(0.5)
—
(0.1)
June 2026
(229.5)
(389.4)
(258.1)
(380.2)
(18.8)
(94.6)
Australia
Figures in millions unless otherwise stated
AISC
(per table on page 39)
Add back by-product credits
AISC gross of by-product credits
Damang
June 2025
(154.8)
(275.2)
(193.9)
(135.5)
(17.1)
(107.1)
June 2026
102.6
169.8
144.3
122.7
—
22.7
June 2025
112.5
168.7
128.7
71.9
—
51.7
AISC gross of by-product credits per equivalent
ounce of gold – US$/eq oz
June 2026
2,237
2,293
1,789
3,099
—
4,170
June 2025
1,376
1,631
1,507
1,885
—
2,072
AIC
(per table on page 39)
June 2026
(245.4)
(450.4)
(262.1)
(378.8)
(170.2)
(94.5)
June 2025
(184.2)
(349.6)
(197.8)
(135.0)
(122.8)
(107.0)
June 2026
(0.6)
(1.8)
(0.2)
(2.2)
—
(0.1)
June 2025
(0.3)
(0.7)
(0.1)
(0.5)
—
(0.1)
June 2026
(246.0)
(452.2)
(262.4)
(381.0)
(170.2)
(94.6)
Gold-equivalent ounces sold
Add back by-product credits
AIC gross of by-product credits
Gold-equivalent ounces sold
AIC gross of by-product credits per equivalent ounce
of gold – US$/eq oz
1
Discontinued
June 2025
(184.5)
(350.3)
(197.9)
(135.5)
(122.8)
(107.1)
June 2026
102.6
169.8
144.3
122.7
—
22.7
June 2025
112.5
168.7
128.7
71.9
—
51.7
June 2026
2,397
2,663
1,818
3,106
—
4,170
June 2025
1,640
2,076
1,538
1,885
—
2,072
Results are reported on a 50% basis up to the acquisition of Gold Road on 26 September 2025, and on a 100% basis from that date forward
42
GOLD FIELDS H1 Results 2026
Underground and surface
Total Mine
Operations
including
Discontinued
Operations
Ounces with metric
tonnes and grade
Total Mine
Operations
excluding
Discontinued
Operations
Peru
Chile
Cerro
Corona
Salares
Norte
Ghana
South Africa
Australia
Tarkwa
South
Deep
Agnew
Discontinued
St Ives
Granny
Smith
Gruyere1
Damang
Tonnes mined (000 tonnes)
– underground ore
– underground waste
– surface ore
– total
June 2026
3,168
3,168
—
—
—
878
564
1,023
702
—
—
June 2025
3,225
3,225
—
—
—
827
549
1,141
708
—
—
June 2026
1,297
1,297
—
—
121
436
515
225
—
—
June 2025
1,395
1,395
—
—
—
154
478
500
264
—
—
June 2026
11,651
10,872
—
2,359
4,004
—
—
1,194
—
3,315
779
June 2025
16,997
16,987
7,024
930
5,552
—
—
1,114
—
2,367
10
June 2026
16,116
15,337
—
2,359
4,004
999
1,001
2,732
927
3,315
779
June 2025
21,617
21,607
7,024
930
5,552
981
1,027
2,755
971
2,367
10
June 2026
5.2
5.2
—
—
—
5.5
5.7
3.9
6.4
—
—
June 2025
5.2
5.2
—
—
—
6.0
6.3
3.6
6.1
—
—
June 2026
1.8
1.9
—
4.7
1.2
—
—
1.3
—
0.9
0.8
Grade mined (grams per tonne)
– underground ore
– surface ore
– total
June 2025
1.2
1.2
0.6
4.9
1.1
—
—
2.0
—
1.1
0.8
June 2026
2.5
2.6
—
4.7
1.2
4.8
5.7
2.5
6.4
0.9
0.8
June 2025
1.8
1.8
0.6
4.9
1.1
5.1
6.3
2.8
6.1
1.1
0.8
June 2026
530.2
530.2
—
—
—
155.2
102.8
128.1
144.1
—
—
June 2025
543.6
543.6
—
—
—
160.4
111.3
132.0
139.8
—
—
June 2026
677.6
658.7
—
360.2
149.7
—
—
49.7
—
99.2
18.8
Gold mined (000 ounces)
– underground ore
– surface ore
– total
June 2025
647.7
647.4
144.2
146.9
204.8
—
—
71.5
—
80.0
0.2
June 2026
1,207.7
1,188.9
—
360.2
149.7
155.2
102.8
177.7
144.1
99.2
18.8
June 2025
1,191.3
1,191.0
144.2
146.9
204.8
160.4
111.3
203.5
139.8
80.0
0.2
June 2026
3,208
3,208
—
—
—
861
624
954
770
—
—
June 2025
3,232
3,232
—
—
—
788
598
1,141
705
—
—
June 2026
71
71
—
—
—
71
—
—
—
—
—
June 2025
126
126
—
—
—
126
—
—
—
—
—
June 2026
19,001
17,668
3,186
1,035
7,045
539
—
1,211
—
4,652
1,333
2,327
Ore milled/treated (000 tonnes)
– underground ore
– underground waste
– surface ore
– total
June 2025
17,535
15,208
3,276
469
7,441
620
—
1,153
—
2,249
June 2026
22,281
20,947
3,186
1,035
7,045
1,470
624
2,165
770
4,652
1,333
June 2025
20,893
18,566
3,276
469
7,441
1,534
598
2,294
705
2,249
2,327
June 2026
5.0
5.0
—
—
—
5.4
5.1
3.8
6.0
—
—
June 2025
5.1
5.1
—
—
—
5.9
6.3
3.3
5.9
—
—
June 2026
1.3
1.3
0.6
10.1
0.8
0.1
—
1.4
—
0.8
0.5
Yield (grams per tonne)
– underground ore
– surface ore
– combined
June 2025
1.1
1.2
0.9
8.2
1.0
0.1
—
1.7
—
1.0
0.7
June 2026
1.8
1.9
0.6
10.1
0.8
3.2
5.1
2.4
6.0
0.8
0.5
June 2025
1.7
1.9
0.9
8.2
1.0
3.1
6.3
2.5
5.9
1.0
0.7
—
Gold produced (000 ounces)
– underground ore
– surface ore
– total
1
June 2026
515.4
515.4
—
—
—
148.8
102.8
116.3
147.4
—
June 2025
526.2
526.2
—
—
—
150.7
121.5
120.2
133.8
—
—
June 2026
783.2
761.1
56.9
336.9
191.9
2.2
—
53.5
—
119.7
22.1
June 2025
644.5
592.8
97.4
123.6
232.9
2.4
—
64.3
—
72.1
51.7
June 2026
1,298.5
1,276.5
56.9
336.9
191.9
151.0
102.8
169.8
147.4
119.7
22.1
June 2025
1,170.7
1,118.9
97.4
123.6
232.9
153.1
121.5
184.5
133.8
72.1
51.7
Results are reported on a 50% basis up to the acquisition of Gold Road on 26 September 2025, and on a 100% basis from that date forward
43
GOLD FIELDS H1 Results 2026
Review of operations
Quarter ended 30 June 2026 compared with quarter ended
31 March 2026
Figures may not add as they are rounded independently.
Gruyere
June
2026
March
2026
%
Variance
Ore mined
000
tonnes
1,878
1,438
31
Waste (Capital)
000
tonnes
9,436
10,003
(6)
Waste (Operational)
000
tonnes
1,081
314
244
Total waste mined
000
tonnes
10,517
10,317
2
Total tonnes mined
000
tonnes
12,395
11,755
5
Grade mined
g/t
0.97
0.88
10
Gold mined
000’oz
58.5
40.7
44
Strip ratio
waste/
ore
5.6
7.2
(22)
Tonnes milled
000
tonnes
2,320
2,332
(1)
g/t
0.89
0.71
25
Gold produced
000’oz
66.5
53.2
25
Gold sold
000’oz
67.3
55.3
22
A$/oz
4,419
4,343
2
AISC
US$/oz
3,131
3,021
4
A$/oz
4,434
4,345
2
US$/oz
3,142
3,022
4
A$m
140.8
110.3
28
US$m
99.7
76.7
30
A$m
1.0
0.1
900
Yield
AIC
Sustaining capital expenditure
Non-sustaining capital expenditure
Total capital expenditure
44
GOLD FIELDS H1 Results 2026
US$m
0.7
0.1
600
A$m
141.8
110.4
28
US$m
100.4
76.8
31
Gold production increased by 25% to 66,500oz
in the June quarter from 53,200oz in the March
quarter due to increased availability of fresh
rock during the June quarter. March quarter
production was affected by a significant rainfall
event, which disrupted ex-pit production for
approximately four weeks.
AIC increased by 2% to A$4,434/oz (US$3,142/oz)
in the June quarter from A$4,345/oz (US$3,022/oz)
in the March quarter mainly due to increased
production costs, driven by higher ore and
operational waste mined, along with increased
capital expenditure, partially offset by higher gold
sales.
Total capital expenditure increased by 28% to
A$142m (US$101m) in the June quarter from
A$110m (US$77m) in the March quarter, primarily
due to increased pre-strip mining at stage 6 of
the Gruyere pit, together with the purchase of two
new excavators.
Review of operations continued
Granny Smith
June
2026
March
2026
%
Variance
Underground ore mined
000
tonnes
345
357
(3)
Underground waste mined
000
tonnes
140
86
63
Total tonnes mined
000
tonnes
485
443
g/t
6.47
6.30
3
Gold mined
000’oz
71.7
72.4
(1)
Tonnes milled
000
tonnes
358
412
(13)
Grade mined – underground
Yield
9
g/t
6.03
5.89
2
Gold produced
000’oz
69.4
78.0
(11)
Gold sold
000’oz
66.3
78.0
(15)
A$/oz
2,841
2,289
24
US$/oz
2,016
1,592
27
A$/oz
2,889
2,326
24
US$/oz
2,050
1,618
27
A$m
65.2
38.6
69
US$m
46.1
26.9
71
A$m
0.2
0.1
100
US$m
0.1
0.1
—
A$m
65.4
38.7
69
US$m
46.2
27.0
71
AISC
AIC
Sustaining capital expenditure
Non-sustaining capital expenditure
Total capital expenditure
45
GOLD FIELDS H1 Results 2026
Gold production decreased by 11% to 69,400oz
in the June quarter from 78,000oz in the March
quarter mainly due to a decrease in tonnes
processed attributable to decreased ore mined.
Ore extraction was primarily focused in the Z120
and Z135 areas, where increased volumes of
higher-grade ore were mined.
AIC increased by 24% to A$2,889/oz (US$2,050/
oz) in the June quarter from A$2,326/oz
(US$1,618/oz) in the March quarter, mainly due to
increased capital expenditure combined with a
decrease in gold sold.
Total capital expenditure increased by 69% to
A$65m (US$46m) in the June quarter from
A$39m (US$27m) in the March quarter, with
A$30m (US$21m) spent on development in the
Z135 mining area and A$15m (US$10m) spent on
the Wallaby Enabling Infrastructure Project.
The Wallaby Enabling Infrastructure Project
represents a major investment in the long-term
sustainability of the Wallaby underground mine,
with total expenditure of A$465 million
US$330 million) scheduled to be spent over the
next two years. The project will deliver integrated
ventilation, cooling and power infrastructure
required to sustain safe and productive mining
operations at increasing depth within the mine.
Review of operations continued
St Ives
June
2026
March
2026
%
Variance
Underground
Ore mined
000
tonnes
508
515
(1)
Waste mined
000
tonnes
251
264
(5)
Total tonnes mined
000
tonnes
759
779
(3)
Grade mined
g/t
4.39
3.40
29
Gold mined
000’oz
71.8
56.3
28
Ore mined
000
tonnes
766
428
79
Waste (Capital)
000
tonnes
757
1,411
(46)
Waste (Operational)
000
tonnes
1,126
157
617
Total waste mined
000
tonnes
1,883
1,568
20
Total tonnes mined
000
tonnes
2,649
1,996
33
Surface
Grade mined
g/t
1.04
1.76
(41)
Gold mined
000’oz
25.5
24.2
5
Strip ratio
waste/
ore
2.5
3.7
(32)
000
tonnes
1,275
943
35
Total grade mined
g/t
2.37
2.65
(11)
Total tonnes mined
000
tonnes
3,408
2,775
23
Total gold mined
000’oz
97.3
80.5
21
Tonnes milled
000
tonnes
1,018
1,147
(11)
Yield – underground
g/t
4.46
3.25
37
Yield – surface
g/t
1.29
1.45
(11)
Yield – combined
g/t
2.63
2.27
16
Gold produced
000’oz
86.1
83.7
3
Gold sold
000’oz
86.1
83.7
3
A$/oz
3,495
2,995
17
US$/oz
2,477
2,083
19
12
Total (underground and surface)
Total ore mined
AISC
AIC
Sustaining capital expenditure
Non-sustaining capital expenditure
Total capital expenditure
46
GOLD FIELDS H1 Results 2026
A$/oz
3,978
3,566
US$/oz
2,820
2,480
14
A$m
60.5
40.8
48
US$m
42.8
28.4
51
A$m
34.7
39.2
(11)
US$m
24.7
27.3
(10)
A$m
95.2
80.0
19
US$m
67.5
55.7
21
Gold production increased by 3% to 86,100oz
in the June quarter from 83,700oz in the March
quarter due to increased grade of ore mined from
Hamlet underground mine, which resulted in a
higher yield achieved. Ore mined from surface
sources increased in the June quarter, with Santa
Ana open pit transitioning from pre-strip to ore
production.
AIC increased by 12% to A$3,978/oz (US$2,820/oz)
in the June quarter from A$3,566/oz US$2,480/oz)
in the March quarter, mainly due to increased
production costs, driven by increased ore mined
at Santa Ana open pit, along with increased
capital expenditure, partially offset by higher
gold sales.
Total capital expenditure increased by 19% to
A$95m (US$68m) in the June quarter from
A$80m (US$56m) in the March quarter.
Expenditure for the June quarter included A$6m
(US$4m) for the fresh air ventilation project at the
Invincible underground mine, A$9m (US$6m) for
the purchase of a replacement mill motor, and
A$11m (US$8m) for the Renewables Power
Project.
Review of operations continued
Agnew
June
2026
March
2026
%
Variance
Underground ore mined
000
tonnes
282
282
—
Underground waste mined
000
tonnes
214
222
(4)
Total tonnes mined
000
tonnes
496
504
(2)
g/t
6.43
4.90
31
Gold mined
000’oz
58.4
44.5
31
Tonnes milled
000
tonnes
328
296
11
Grade mined – underground
Yield – underground
g/t
5.46
4.77
14
Gold produced
000’oz
57.5
45.4
27
Gold sold
000’oz
56.7
45.9
24
A$/oz
3,068
3,307
(7)
US$/oz
2,175
2,300
(5)
A$/oz
3,256
3,584
(9)
US$/oz
2,309
2,493
(7)
A$m
30.5
25.7
19
US$m
21.6
17.9
21
A$m
5.3
6.1
(13)
US$m
3.7
4.2
(12)
A$m
35.8
31.8
13
US$m
25.3
22.1
14
AISC
AIC
Sustaining capital expenditure
Non-sustaining capital expenditure
Total capital expenditure
47
GOLD FIELDS H1 Results 2026
Gold production increased by 27% to 57,500oz
in the June 2026 quarter from 45,400oz in the
March 2026 quarter due to increased grade of
ore mined at Redeemer.
AIC decreased by 9% to A$3,256/oz (US$2,309/oz)
in the June quarter from A$3,584/oz
(US$2,493/oz) in the March quarter mainly due to
increased gold sold partially offset by increased
capital expenditure.
Total capital expenditure increased by 13% to
A$36m (US$25m) in the June quarter from
A$32m (US$22m) in the March quarter with
increased expenditure on underground and
process plant infrastructure projects.
Review of operations continued
South Deep
Ore mined
000
tonnes
June
2026
March
2026
%
Variance
443
435
2
60
60
—
000
tonnes
000
tonnes
503
495
2
Grade mined – underground reef
g/t
5.37
5.63
(5)
Grade mined – underground total
g/t
4.73
4.94
(4)
kg
2,381
2,446
(3)
(3)
Waste mined
Total tonnes
Gold mined
000’oz
76.5
78.6
Development
m
2,659
2,538
5
Secondary support
m
3,473
2,918
19
Backfill
m3
135,347
180,528
(25)
Ore milled – underground reef
000
tonnes
430
430
—
Ore milled – underground waste
000
tonnes
29
42
(31)
Total underground tonnes milled
000
tonnes
459
472
(3)
Ore milled – surface
000
tonnes
217
322
(33)
Total tonnes milled
000
tonnes
676
794
(15)
Yield – underground reef
g/t
5.45
5.30
3
Surface yield
g/t
0.15
0.12
25
Total yield
g/t
3.52
2.92
21
kg
2,380
2,318
3
000’oz
76.5
74.5
3
kg
2,398
2,182
10
000’oz
77.1
70.1
10
R/kg 1,152,938
1,134,920
2
2,177
2,160
1
R/kg 1,178,231
1,167,452
1
—
Gold produced
Gold sold
AISC
US$/oz
AIC
Sustaining capital expenditure
Non-sustaining capital expenditure
Total capital expenditure
48
GOLD FIELDS H1 Results 2026
US$/oz
2,225
2,222
Rm
428.6
425.8
1
US$m
26.0
26.1
—
Rm
60.6
71.0
(15)
US$m
3.7
4.3
(14)
Rm
489.3
496.8
(2)
US$m
29.7
30.4
(2)
Gold production increased by 3% to 2,380kg
(76,5koz) in the June quarter compared with
2,318kg (74.5koz) in the March quarter. This
improvement was primarily driven by higher
contributions from destress mining volumes,
and grade improvements in both development
and destress, which are influenced by mining
sequence. As destress cuts advanced into reef
horizons, waste mining decreased by 31%
compared to the March quarter. Surface tonnes
milled decreased by 33% from 322kt in the March
quarter to 217kt in the June quarter due to
scheduled maintenance associated with the
thickened tailings project, which is aimed at
reducing the volume of water reporting to the
tailings storage facility. Backfill volumes placed
decreased by 25% during the quarter, as
available voids were largely filled in the March
2026 quarter. Backfill placement is expected to
increase in the September 2026 quarter as
additional voids become available for filling.
AIC R/kg increased by 1% to R1,178,231/kg
(US$2,225/oz) due to higher royalty cost linked to
higher revenue and net profit, and higher cost of
sales before amortisation and depreciation,
partially offset by higher gold sold (10% increase
quarter on quarter).
Total capital expenditure decreased by 2% to
R489m (US$30m) in the June 2026 quarter from
R497m (US$30m) in the March 2026 quarter.
Review of operations continued
Damang
June
2026
March
2026
%
Variance
Ore mined
000
tonnes
101
677
(85)
Waste (Operational)
000
tonnes
821
5,280
(84)
Total tonnes mined
000
tonnes
922
5,957
(85)
Strip ratio
waste/
ore
8.1
7.8
4
Grade mined
g/t
0.78
0.75
4
Gold mined
000’oz
2.5
16.3
(85)
Tonnes milled
000
tonnes
186
1,147
(84)
g/t
0.51
0.52
(2)
000’oz
3.1
19.0
(84)
Yield
Gold produced
Gold sold
000’oz
3.1
19.6
(84)
AISC
US$/oz
8,192
3,537
132
AIC
US$/oz
8,192
3,537
132
49
GOLD FIELDS H1 Results 2026
The Damang mine was formally transferred to the
Government of Ghana on 18 April 2026 following
the expiry of the 12-month mining lease that was
granted to Gold Fields in April 2025. As a result
of the transfer, comparisons to prior periods are
not on a like for like basis.
Gold production decreased by 84% to 3,100oz in
the June quarter from 19,000oz in the March
quarter due to lower milled tonnes. Tonnes milled
decreased by 84% to 186kt in the June quarter
from 1,147kt in the March quarter due to cessation
of operations on 17 April 2026.
AIC increased by 132% to US$8,192/oz in the
June quarter from US$3,537/oz in the March
quarter mainly due to lower gold sold partly offset
by lower operating cost and royalties. Gold sold
decreased by 84% to 3,100oz in the June quarter
from 19,600oz in the quarter due to lower gold
produced.
Review of operations continued
Tarkwa
June
2026
March
2026
%
Variance
Ore mined
000
tonnes
2,469
1,535
61
Waste (Capital)
000
tonnes
8,665
15,697
(45)
Waste (Operational)
000
tonnes
10,889
6,948
57
Total waste mined
000
tonnes
19,554
22,645
(14)
Total tonnes mined
000
tonnes
22,023
24,180
(9)
Strip ratio
waste/
ore
7.9
14.7
(46)
Grade mined
g/t
1.09
1.29
(16)
Gold mined
000’oz
86.2
63.4
36
Tonnes milled
000
tonnes
3,621
3,423
6
g/t
0.84
0.86
(2)
Gold produced
000’oz
97.5
94.4
3
Gold sold
000’oz
97.4
95.3
2
AISC
US$/oz
2,376
2,973
(20)
AIC
US$/oz
2,482
2,973
(17)
Sustaining capital expenditure
US$m
62.5
95.8
(35)
Non-sustaining capital expenditure
US$m
10.3
—
100
Total capital expenditure
US$m
72.8
95.8
(24)
Yield
50
GOLD FIELDS H1 Results 2026
Gold production increased by 3% to 97,500oz
in the June quarter from 94,400oz in the March
quarter due to higher milled tonnes. Tonnes
milled increased by 6% to 3,621kt in the June
quarter from 3,423kt in the March quarter due to
higher plant availability and utilisation in the
June quarter.
AIC decreased by 17% to US$2,482/oz in the
June quarter from US$2,973/oz in the March
quarter mainly due to lower GIP cost and lower
capital expenditure.
GIP cost decreased by 138% to a credit of
US$14.6m in the June quarter from a cost of
US$38.3m in the March quarter mainly due to
addition of 0.15Mt to run of mine (ROM) stockpile
in the June quarter compared to a depletion of
1.59Mt in the March quarter.
Total capital expenditure decreased by 24% to
US$73m in the June quarter from US$96m in the
March quarter mainly due to lower capital waste
tonnes mined in the June quarter.
Review of operations continued
Salares Norte
June
2026
March
2026
%
Variance
Ore mined
000
tonnes
1,491
868
72
Waste (capital)
000
tonnes
2,323
1,231
89
Waste (operational)
000
tonnes
1,877
3,141
(40)
Total waste mined
000
tonnes
4,200
4,372
(4)
Total tonnes mined
000
tonnes
5,691
5,240
9
Strip ratio
waste/
ore
2.82
5.04
(44)
27
Grade mined – gold
g/t
5.15
4.05
Grade mined – silver
g/t
85.51
62.54
37
Gold mined
000’oz
247.1
113.1
118
Silver mined
000’oz
4,098
1,745
135
Tonnes milled
000
tonnes
530
505
5
Gold recoveries
per cent
93
91
2
Silver recoveries
per cent
80
81
(1)
Yield – gold
g/t
8.6
9.1
(5)
– silver
g/t
63.4
90.7
(30)
(10)
eq g/t
9.6
10.7
Gold produced
– combined
000’oz
146.1
148.2
(1)
Silver produced
000’oz
1,079.9
1,473.2
(27)
Total equivalent gold produced
000’
eq oz
163.7
173.3
(6)
Total equivalent gold sold
000’
eq oz
162.8
171.0
(5)
AISC
US$/oz
436
102
327
AISC
US$/
eq oz
876
800
10
AIC
US$/oz
511
165
210
AIC
US$/
eq oz
943
854
10
Sustaining capital expenditure
US$m
19.2
17.0
13
Non-sustaining expenditure
US$m
7.6
3.1
145
Total capital expenditure
US$m
26.8
20.1
33
51
GOLD FIELDS H1 Results 2026
Gold and silver production for the June 2026
quarter were 146,100oz and 1,079,900oz,
respectively.
Gold-equivalent
production
decreased by 6% to 163,700eqoz in the June
quarter from 173,300eqoz in the March quarter,
mainly due to lower silver production, while gold
production remained similar. Tonnes milled
increased by 5%, and gold recovery improved
to 93%.
During the June quarter, the operation remained
focused on delivering the production plan and
advancing winter-readiness and plant reliability
initiatives to support stable performance through
the winter season.
AIC increased by 210% to US$511/oz in the June
quarter from US$165/oz in the March 2026
quarter, mainly reflecting lower silver by-product
credits and higher capital expenditure.
Total capital expenditure increased by 33% to
US$27m in the June quarter from US$20m in the
March 2026 quarter, primarily due to higher
expenditure on AA pre-stripping activities as well
as winter-readiness and plant reliability initiatives.
Review of operations continued
Cerro Corona
June
2026
March
2026
%
Variance
Tonnes milled
000
tonnes
1,592
1,594
—
Gold recovery
per cent
67.5
68.7
(2)
Copper recovery
per cent
82.8
85.5
(3)
Yield – gold
g/t
0.33
0.32
3
– silver
per cent
0.29
0.29
—
eq g/t
3.52
0.54
552
Gold produced
– combined
000’oz
16.0
16.0
—
Copper produced
tonnes
4,489
4,441
1
Total equivalent gold produced
000’
eq oz
29.2
27.7
5
Total equivalent gold sold
000’
eq oz
26.1
29.9
(13)
AISC
US$/oz
1,412
1,179
20
AISC
US$/
eq oz
3,015
2,698
12
AIC
US$/oz
1,928
1,360
42
AIC
US$/
eq oz
3,294
2,802
18
Sustaining capital expenditure
US$m
0.6
(0.2)
(400)
Non-sustaining capital expenditure
US$m
4.1
1.4
193
Total capital expenditure
US$m
4.7
1.2
292
52
GOLD FIELDS H1 Results 2026
Gold-equivalent production increased by 5% to
29,200oz in the June quarter from 27,700oz in
the March quarter, mainly due to slightly higher
gold and copper grades processed, in line with
the rehandle sequence of stockpiles.
AIC per gold ounce sold increased by 42% to
US$1,928/oz in the June quarter from US$1,360/oz
in the March quarter, mainly due to lower gold
ounces sold, and higher exploration and capital
expenditures in the June quarter compared to the
March quarter.
Total capital expenditure increased by 292% to
US$5m in the June quarter from US$1m in the
March quarter, mainly due to the construction
activities of the in-pit tailings deposition system
after the rainy season, which will be completed in
July 2026.
Salient features and cost benchmarks
United States Dollar
South African Rand
Total Mine
Operations
including
Discontinued
Operations
Total Mine
Operations
excluding
Discontinued
Operations
Peru
Chile
Cerro
Corona
Salares
Norte
Jun 2026
10,631
10,444
1,592
Mar 2026
11,650
10,503
1,594
Jun 2025
10,735
9,562
1,674
Jun 2026
1.9
1.9
Mar 2026
1.7
1.9
Jun 2025
1.7
Jun 2026
649.4
Figures are in millions unless otherwise stated
Ghana
South Africa
Tarkwa
South
Deep
South
Deep
530
3,621
676
676
505
3,423
794
794
296
3,802
824
824
0.6
9.6
0.8
3.5
3.5
0.5
10.7
0.9
2.9
2.9
1.9
1.0
7.7
0.9
3.1
3.1
646.4
29.2
163.7
97.5
76.5
2,380
Operating results
Ore milled/treated (000 tonnes)
Yield (grams per tonne)
Gold produced (000 managed equivalent ounces)
Gold produced (000 attributable equivalent ounces)
Gold sold (000 managed equivalent ounces)
Cost of sales before amortisation and depreciation (million)
Sustaining capital (million)
Non-sustaining capital (million)
Total capital expenditure (million)
AISC costs (Dollar per ounce)
Total AIC (Dollar per ounce)
Mar 2026
649.1
630.1
27.7
173.3
94.4
74.5
2,318
Jun 2025
602.0
576.0
51.8
73.4
106.6
81.0
2,518
Jun 2026
634.0
631.2
29.1
163.7
87.7
71.2
2,216
Mar 2026
632.5
615.4
27.5
173.3
85.0
69.4
2,158
Jun 2025
585.6
562.2
51.6
73.4
95.9
78.1
2,428
Jun 2026
642.9
639.8
26.1
162.8
97.4
77.1
2,398
Mar 2026
648.9
629.3
29.9
171.0
95.3
70.1
2,182
Jun 2025
558.7
532.7
50.3
72.8
104.6
72.1
2,243
Jun 2026
(848.8)
(824.4)
(64.0)
(85.0)
(125.5)
(119.0)
(1,961.3)
Mar 2026
(918.7)
(854.4)
(65.9)
(103.3)
(178.4)
(111.6)
(1,822.9)
Jun 2025
(602.8)
(558.9)
(48.3)
(38.4)
(156.2)
(90.4)
(1,653.4)
Jun 2026
(318.6)
(318.6)
(0.6)
(19.2)
(62.5)
(26.0)
(428.6)
Mar 2026
(288.5)
(288.5)
0.2
(17.0)
(95.8)
(26.1)
(425.8)
Jun 2025
(255.5)
(255.7)
(0.4)
(79.2)
(62.3)
(27.3)
(499.7)
Jun 2026
(54.9)
(54.9)
(4.1)
(7.6)
(10.3)
(3.7)
(60.6)
Mar 2026
(40.4)
(40.4)
(1.4)
(3.1)
—
(4.3)
(71.0)
Jun 2025
(92.8)
(92.8)
(3.1)
(36.9)
—
—
—
Jun 2026
(373.5)
(373.5)
(4.7)
(26.8)
(72.8)
(29.7)
(489.2)
Mar 2026
(328.9)
(328.9)
(1.2)
(20.1)
(95.8)
(30.4)
(496.8)
Jun 2025
(348.3)
(348.5)
(3.5)
(116.1)
(62.3)
(27.3)
(499.7)
Jun 2026
1,937
1,906
1,412
436
2,376
2,177
1,152,938
Mar 2026
1,818
1,761
1,179
102
2,973
2,160
1,134,920
Jun 2025
1,730
1,712
424
1,638
2,329
1,801
1,059,492
Jun 2026
2,055
2,024
1,928
511
2,482
2,225
1,178,231
Mar 2026
1,917
1,864
1,360
165
2,973
2,222
1,167,452
Jun 2025
1,937
1,930
606
2,215
2,329
1,801
1,059,492
Average exchange rates were US$1 = R16.49, US$1 = R16.34 and US$1 = R18.29 for the June 2026, March 2026 and June 2025 quarters
The Australian/US Dollar exchange rates were A$1 = US$0.71, A$1 = US$0.70 and A$1 = 0.64 for the June 2026, March 2026 and June 2025 quarters
Figures may not add as they are rounded independently
53
GOLD FIELDS H1 Results 2026
Salient features and cost benchmarks continued
United States Dollar
Australian Dollar
United States
Dollar
Australia
Australia
Discontinued
Agnew
St Ives
Granny
Smith
Jun 2026
328
1,018
358
2,320
328
1,018
358
2,320
186
Mar 2026
296
1,147
412
2,332
296
1,147
412
2,332
1,147
Figures are in millions unless otherwise stated
Gruyere1
Agnew
St Ives Granny Smith
Gruyere1
Damang
Operating results
Ore milled/treated
(000 tonnes)
Yield (grams per tonne)
Gold produced (000 managed equivalent
ounces)
Gold produced (000 attributable equivalent
ounces)
Gold sold (000 managed equivalent ounces)
Cost of sales before amortisation and
depreciation (million)
Sustaining capital (million)
Non-sustaining capital (million)
Total capital expenditure (million)
AISC (Dollar per ounce)
Total AIC (Dollar per ounce)
Jun 2025
323
1,160
364
1,118
323
1,160
364
1,118
1,173
Jun 2026
5.5
2.6
6.0
0.9
5.5
2.6
6.0
0.9
0.5
Mar 2026
4.8
2.3
5.9
0.7
4.8
2.3
5.9
0.7
0.5
Jun 2025
5.4
2.7
6.1
1.0
5.4
2.7
6.1
1.0
0.7
Jun 2026
57.5
86.1
69.4
66.5
57.5
86.1
69.4
66.5
3.1
Mar 2026
45.4
83.7
78.0
53.2
45.4
83.7
78.0
53.2
19.0
Jun 2025
56.1
99.2
71.4
36.5
56.1
99.2
71.4
36.5
26.0
Jun 2026
57.5
86.1
69.4
66.5
57.5
86.1
69.4
66.5
2.8
Mar 2026
45.4
83.7
78.0
53.2
45.4
83.7
78.0
53.2
17.1
Jun 2025
56.1
99.2
71.4
36.5
56.1
99.2
71.4
36.5
23.4
Jun 2026
56.7
86.1
66.3
67.3
56.7
86.1
66.3
67.3
3.1
Mar 2026
45.9
83.7
78.0
55.3
45.9
83.7
78.0
55.3
19.6
Jun 2025
50.1
83.5
61.6
37.7
50.1
83.5
61.6
37.7
26.0
Jun 2026
(88.6)
(155.4)
(75.7)
(111.2)
(125.0)
(219.1)
(106.4)
(156.8)
(24.4)
Mar 2026
(76.0)
(137.9)
(85.6)
(95.9)
(109.2)
(198.3)
(123.1)
(137.9)
(64.3)
Jun 2025
(58.1)
(77.2)
(54.4)
(35.8)
(90.7)
(120.1)
(84.8)
(56.0)
(43.9)
Jun 2026
(21.6)
(42.8)
(46.1)
(99.7)
(30.5)
(60.5)
(65.2)
(140.8)
—
Mar 2026
(17.9)
(28.4)
(26.9)
(76.7)
(25.7)
(40.8)
(38.6)
(110.3)
—
Jun 2025
(9.4)
(24.0)
(22.1)
(31.0)
(14.6)
(37.3)
(34.2)
(48.5)
0.1
Jun 2026
(3.7)
(24.7)
(0.1)
(0.7)
(5.3)
(34.7)
(0.2)
(1.0)
—
Mar 2026
(4.2)
(27.3)
(0.1)
(0.1)
(6.1)
(39.2)
(0.1)
(0.1)
—
Jun 2025
(17.5)
(34.0)
(1.2)
—
(27.5)
(53.2)
(1.9)
—
—
Jun 2026
(25.3)
(67.5)
(46.2)
(100.4)
(35.8)
(95.2)
(65.4)
(141.8)
—
Mar 2026
(22.1)
(55.7)
(27.0)
(76.8)
(31.8)
(80.0)
(38.7)
(110.4)
—
Jun 2025
(26.9)
(58.0)
(23.3)
(31.0)
(42.1)
(90.5)
(36.1)
(48.5)
0.1
8,192
Jun 2026
2,175
2,477
2,016
3,131
3,068
3,495
2,841
4,419
Mar 2026
2,300
2,083
1,592
3,021
3,307
2,995
2,289
4,343
3,537
Jun 2025
1,597
1,556
1,468
1,966
2,493
2,424
2,287
3,072
2,070
Jun 2026
2,309
2,820
2,050
3,142
3,256
3,978
2,889
4,434
8,192
Mar 2026
2,493
2,480
1,618
3,022
3,584
3,566
2,326
4,345
3,537
Jun 2025
2,018
2,063
1,506
1,937
3,154
3,217
2,346
3,027
2,070
Average exchange rates were US$1 = R16.49, US$1 = R16.34 and US$1 = R18.29 for the June 2026, March 2026 and June 2025 quarters
The Australian/US Dollar exchange rates were A$1 = US$0.71, A$1 = US$0.70 and A$1 = 0.64 for the June 2026, March 2026 and June 2025 quarters
1 Results are reported on a 50% basis up to the acquisition of Gold Road on 26 September 2025, and on a 100% basis from that date forward
Figures may not add as they are rounded independently
54
GOLD FIELDS H1 Results 2026
Underground and surface
Total Mine
Operations
including
Discontinued
Operations
Ounces with metric
tonnes and grade
Tonnes mined
(000 tonnes)*
– underground ore
– underground waste
– surface ore
– total
Grade mined
(grams per tonne)
– underground ore
– surface ore
– total
Gold mined
(000 ounces)*
– underground ore
– surface ore
– total
Ore milled/treated
(000 tonnes)
– underground ore
– underground waste
– surface ore
– total
Yield
(Grams per tonne)
– underground ore
– surface ore
– combined
55
Peru
Chile
Total Mine
Operations
excluding
Discontinued
Operations Cerro Corona Salares Norte
Ghana
South Africa
Australia
Discontinued
Tarkwa
South
Deep
Agnew
St Ives
Granny
Smith
Gruyere1
Damang
Jun 2026
1,579
1,579
—
—
443
282
508
345
—
—
Mar 2026
1,589
1,589
—
—
—
435
282
515
357
—
—
Jun 2025
1,607
1,607
—
—
—
411
254
581
361
—
—
Jun 2026
665
665
—
—
60
214
251
140
—
—
Mar 2026
632
632
—
—
—
60
222
264
86
—
—
Jun 2025
700
700
—
—
—
81
246
247
125
—
—
Jun 2026
6,705
6,604
—
1,491
2,469
—
—
766
—
1,878
101
677
Mar 2026
4,946
4,269
—
868
1,535
—
—
428
—
1,438
Jun 2025
9,209
9,200
4,273
543
2,499
—
—
681
—
1,204
10
Jun 2026
8,949
8,848
—
1,491
2,469
503
496
1,525
485
1,878
101
Mar 2026
7,167
6,490
—
868
1,535
495
504
1,207
443
1,438
677
Jun 2025
11,516
11,507
4,273
543
2,499
492
500
1,509
486
1,204
10
Jun 2026
5.5
5.5
—
—
—
5.4
6.4
4.4
6.5
—
—
Mar 2026
4.9
4.9
—
—
—
5.6
4.9
3.4
6.3
—
—
Jun 2025
5.3
5.3
—
—
—
6.0
6.1
3.7
6.5
—
—
Jun 2026
1.9
2.0
—
5.2
1.1
—
—
1.0
—
1.0
0.8
Mar 2026
1.6
1.8
—
4.1
1.3
—
—
1.8
—
0.9
0.7
Jun 2025
1.2
1.2
0.7
5.4
1.1
—
—
2.1
—
1.0
0.8
Jun 2026
2.6
2.6
—
5.2
1.1
4.7
6.4
2.4
6.5
1.0
0.8
Mar 2026
2.4
2.6
—
4.1
1.3
4.9
4.9
2.7
6.3
0.9
0.7
Jun 2025
1.8
1.8
0.7
5.4
1.1
5.0
6.1
2.9
6.5
1.0
0.8
Jun 2026
278.4
278.4
—
—
—
76.5
58.4
71.8
71.7
—
—
Mar 2026
251.8
251.8
—
—
—
78.6
44.5
56.3
72.4
—
—
Jun 2025
274.6
274.6
—
—
—
79.7
50.2
69.6
75.1
—
—
Jun 2026
419.9
417.3
—
247.1
86.2
—
—
25.5
—
58.5
2.5
16.3
Mar 2026
257.7
241.4
—
113.1
63.4
—
—
24.2
—
40.7
Jun 2025
363.0
362.8
91.2
94.6
90.1
—
—
46.1
—
40.6
0.2
Jun 2026
698.3
695.7
—
247.1
86.2
76.5
58.4
97.3
71.7
58.5
2.5
Mar 2026
509.5
493.2
—
113.1
63.4
78.6
44.5
80.5
72.4
40.7
16.3
Jun 2025
637.6
637.4
91.2
94.6
90.1
79.7
50.2
115.7
75.1
40.6
0.2
Jun 2026
1,547
1,547
—
—
—
430
328
431
358
—
—
Mar 2026
1,661
1,661
—
—
—
430
296
523
412
—
—
Jun 2025
1,683
1,683
—
—
—
414
323
581
364
—
—
Jun 2026
29
29
—
—
—
29
—
—
—
—
—
Mar 2026
42
42
—
—
—
42
—
—
—
—
—
Jun 2025
81
81
—
—
—
81
—
—
—
—
—
Jun 2026
9,055
8,868
1,592
530
3,621
217
—
588
—
2,320
186
Mar 2026
9,947
8,800
1,594
505
3,423
322
—
623
—
2,332
1,147
Jun 2025
8,971
7,798
1,674
296
3,802
329
—
579
—
1,118
1,173
Jun 2026
10,631
10,444
1,592
530
3,621
676
328
1,018
358
2,320
186
Mar 2026
11,650
10,503
1,594
505
3,423
794
296
1,147
412
2,332
1,147
Jun 2025
10,735
9,562
1,674
296
3,802
824
323
1,160
364
1,118
1,173
Jun 2026
5.3
5.3
—
—
—
5.5
5.5
4.5
6.0
—
—
Mar 2026
4.7
4.7
—
—
—
5.3
4.8
3.2
5.9
—
—
Jun 2025
5.0
5.0
—
—
—
6.0
5.4
3.4
6.1
—
—
Jun 2026
1.3
1.3
0.6
9.6
0.8
0.1
—
1.3
—
0.9
0.5
Mar 2026
1.2
1.3
0.5
10.7
0.9
0.1
—
1.4
—
0.7
0.5
Jun 2025
1.1
1.2
1.0
7.7
0.9
0.1
—
1.9
—
1.0
0.7
Jun 2026
1.9
1.9
0.6
9.6
0.8
3.5
5.5
2.6
6.0
0.9
0.5
Mar 2026
1.7
1.9
0.5
10.7
0.9
2.9
4.8
2.3
5.9
0.7
0.5
Jun 2025
1.7
1.9
1.0
7.7
0.9
3.1
5.4
2.7
6.1
1.0
0.7
GOLD FIELDS H1 Results 2026
Total Mine
Operations
including
Discontinued
Operations
Ounces with metric
tonnes and grade
Gold produced
(000 ounces)*
– underground ore
– surface ore
– total
Peru
Chile
Total Mine
Operations
excluding
Discontinued
Operations Cerro Corona Salares Norte
Ghana
South Africa
Australia
Tarkwa
South
Deep
Agnew
St Ives
Granny
Smith
Gruyere1
Damang
Jun 2026
264.1
264.1
—
—
—
75.5
57.5
61.7
69.4
—
—
Mar 2026
251.3
251.3
—
—
—
73.3
45.4
54.7
78.0
—
—
Jun 2025
271.2
271.2
—
—
—
79.7
56.1
64.0
71.4
—
—
Jun 2026
385.4
382.3
29.2
163.7
97.5
1.0
—
24.4
—
66.5
3.1
Mar 2026
397.8
378.8
27.7
173.3
94.4
1.2
—
29.0
—
53.2
19.0
Jun 2025
330.9
304.9
51.8
73.4
106.6
1.3
—
35.3
—
36.5
26.0
Jun 2026
649.4
646.4
29.2
163.7
97.5
76.5
57.5
86.1
69.4
66.5
3.1
Mar 2026
649.1
630.1
27.7
173.3
94.4
74.5
45.4
83.7
78.0
53.2
19.0
Jun 2025
602.0
576.0
51.8
73.4
106.6
81.0
56.1
99.2
71.4
36.5
26.0
- Excludes surface material at South Deep
1 Results are reported on a 50% basis up to the acquisition of Gold Road on 26 September 2025, and on a 100% basis from that date forward
56
Discontinued
GOLD FIELDS H1 Results 2026
Administration and corporate information
Corporate Secretary
Investor and media enquiries
Mobile: +27 83 635 5961
Email: [email protected]
Mobile: +27 82 562 5288
Email: [email protected]
Anré Weststrate
Jongisa Magagula
Registered office
Kershnee Govender
Johannesburg
Mobile: +27 83 564 4090
Email: [email protected]
Gold Fields Limited
150 Helen Road
Sandown
Sandton
2196
Email: [email protected]
Email: [email protected]
Transfer Secretaries
Postnet Suite 252
Private Bag X30500
Houghton
2041
Tel: +27 11 562 9700
South Africa
Office of the United Kingdom Secretaries
London
St James’s Corporate Services Limited
Second Floor
107 Cheapside
London
EC2V 6DN
United Kingdom
Tel: +44 (0) 20 3869 0706
Email: [email protected]
Computershare Investor Services (Proprietary) Limited
Rosebank Towers
15 Biermann Avenue
Rosebank
Johannesburg
2196
Private Bag X9000
Saxonwold
2132
Tel: +27 11 370 5000
Fax: +27 11 688 5248
United Kingdom
American depository receipts transfer agent
Shareholder correspondence should be mailed to:
BNY Mellon
P O Box 43006
Providence RI
02940-3078
Overnight correspondence should be sent to:
BNY Mellon
150 Royall St., Suite 101
Canton, MA 02021
Tel: 866 247 3871 Domestic
Tel: 201 680 6825 Foreign
Email: [email protected]
MUFG Corporate Markets (formerly Link Group)
Central Square
29 Wellington Street
Leeds
LSI 4DL
United Kingdom
Tel: +44 (0) 371 664 0300
Email: [email protected]
Calls are charged at the standard geographic rate and will vary by
provider. Calls outside the United Kingdom will be charged at the
applicable international rate. Lines are open between 09:00 – 17:30,
Monday to Friday excluding public holidays in England and Wales.
Email: [email protected]
Sponsor
J.P. Morgan Equities South Africa Proprietary Limited
1 Fricker Road
Illovo, Johannesburg 2196
South Africa
Website
www.goldfields.com
Listings
JSE / NYSE
JF MacKenzie*† (Chairperson) MJ Fraser∞ (Chief Executive Officer) AT Dall∞ (Chief Financial Officer) A Andani#†
ZBM Bassa† MC Bitar@† TP Goodlace† SL McCrae^^† JE McGill^† MI Rawlinson*† PG Sibiya† CAT Smit†
^ Australian * British @Chilean #Ghanaian ^^Canadian
†Independent Director ∞Non-independent Director
57
GOLD FIELDS H1 Results 2026
Forward-looking statements
This announcement contains forward-looking statements within the meaning of the “safe harbour” provisions of the Private Securities Litigation Reform
Act of 1995. All statements other than statements of historical fact included in this announcement may be forward-looking statements. Forward-looking
statements may be identified by the use of words such as “aim”, “anticipate”, “will”, “would”, “expect”, “may”, “could”, “believe”, “target”, “estimate”,
“project” and words of similar meaning.
These forward-looking statements, including among others, those relating to Gold Fields’ future business strategy, development activities (including
the approvals, permitting, development operations and final investments decisions relating to the Windfall Project) and other initiatives, anticipated
benefits of acquisitions or joint ventures, (including the acquisition of Gold Road Resources Limited), ability to successfully renew, extend and/or retain
mining rights, licences, development or fiscal stability agreements, or other interests (including the satisfaction of licence conditions), ability to
conclude divestments on favourable terms (if at all), business prospects, financial positions, production and operational guidance, climate and ESGrelated statements, targets and metrics, are necessary estimates reflecting the best judgement of the senior management of Gold Fields and involve a
number of risks and uncertainties that could cause actual results to differ materially from those suggested by the forward-looking statements. By their
nature, forward-looking statements involve risk and uncertainty because they relate to future events and circumstances and should be considered in
light of various important factors, including those set forth in Gold Fields’ Integrated Annual Report 2025 filed with the Johannesburg Stock Exchange
and the Annual Report on Form 20-F filed with the United States Securities and Exchange Commission (SEC) on 30 March 2026 (SEC File no.
001-31318). Readers are cautioned not to place undue reliance on such statements. These forward-looking statements speak only as of the date they
are made. Gold Fields undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or
circumstances after the date of this announcement or to reflect the occurrence of unanticipated events. These forward-looking statements have not
been reviewed or reported on by the Company’s external auditors.
This announcement includes certain non-International Financial Reporting Standards (IFRS) financial measures, including, net debt (including and
excluding lease liabilities), adjusted EBITDA, sustaining capital expenditure, non-sustaining capital expenditure, adjusted free cash flow, adjusted free
cash flow from operations, adjusted free cash flow before discretionary growth investments, all-in sustaining cost (AISC) and total all-in cost (AIC).
These measures may not be comparable to similarly-titled measures used by other companies and are not measures of Gold Fields financial
performance under IFRS. These measures should not be considered in isolation or as a substitute for measures of performance prepared in
accordance with IFRS. The financial information contained in this announcement has not been reviewed or reported on by Gold Fields' external
auditors.
The key non-IFRS measures used include, net debt (including and excluding lease liabilities), adjusted EBITDA, sustaining capital expenditure, nonsustaining capital expenditure, adjusted free cash flow, adjusted free cash flow from operations, adjusted free cash flow before discretionary growth
investments, all-in sustaining cost (AISC) and total all-in cost (AIC). The applicable criteria on the basis of which this information has been prepared is
set out in the notes accompanying the announcement.
58
GOLD FIELDS H1 Results 2026