Dakota Gold Corp. is a gold exploration and development company operating in the United States. Incorporated in 2017 as JR Resources Corp., the company changed its name and domesticated to Nevada in 2020 before moving its state of incorporation to Delaware in 2024. The company focuses on the acquisition, exploration, and development of mineral properties, specifically within the Homestake District of South Dakota. Its primary assets include the Richmond Hill Gold Project and the Maitland Gold Project, both located on private land in the historic Homestake Mining District. Dakota Gold holds ownership of these properties, which comprise unpatented claims and surface leases. The company has option agreements with Barrick Gold for the Richmond Hill and Homestake properties, providing access to historical exploration data. Management includes personnel with experience in the Homestake and Wharf Mines. The company is advancing the Richmond Hill project toward production and continues to define the underground gold resource potential at Maitland.

Summarised from the company's own disclosures, fiscal year ended Mar 2026

Industry Gold Homepage dakotagoldcorp.com
Sector Basic Materials IR page dakotagoldcorp.com/investor-info/overview
Tags
gold exploration, mineral development, oxide gold, underground mining, resource definition, metallurgical testing, Richmond Hill Gold Project, Maitland Gold Project, Barrick Option, Homestake District, JB Gold Zone, Unionville Zone, Barrick Gold, Dakota Territory Resource Corp.
Press page dakotagoldcorp.com/investor-info/news

Metrics

Valuation  
Market cap $ 817.264M
Market cap (USD) $ 817.264M
P/E -22.56
PEG —
P/BV 4.62
P/S —
P/OCF -27.79
P/FCF -26.27
Dividend yield —
Turnover / mcap —
Returns  
ROE -28.9%
ROI -35.6%
ROIC -27.8%
Profit margin —
Growth  
Revenue growing —
Profits growing Yes
Revenue up 3y —
Revenue up 5y —
Earnings growth 3y (net profit CAGR) —
Quality  
Profitable No
Margin expanding —
Buying back stock No
Diluting (TTM) Yes
Debt/Equity —
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 20
Quality score -46.2%
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2021
Assets 115.858M 95.354M 108.203M 120.085M
Net profit -29.539M -33.885M -36.449M -12.614M
Free cash flow -25.642M -31.622M -32.252M -10.405M

Figure FY 2025 FY 2024 FY 2023 FY 2021
Share price 5.68 2.2 2.62 5.02
Price performance 12m 1.58 -0.16 -0.14 —

Filed figures

Figure Mar 2021 Dec 2021 Mar 2022 Dec 2022 Dec 2023 Dec 2024 Dec 2025
Balance sheet detail
Trade receivables (USD) 0.00 — 94,807 107,356 — — —
Lease liabilities (USD) — — — 0.00 229,612 326,946 205,666
Cash and deposits (USD) 11.4M 46.8M 41.4M 23.9M 25.5M 9.41M 29.7M
Right-of-use assets (USD) — — — — — — 200,000
Cash flow detail
Operating cash flow (USD) -2.17M — -9.91M — -31.2M -31.5M -25.4M
Purchases of property, plant and equipment (USD) -879,249 — -492,272 — -1.05M -143,387 -196,445
Change in receivables (cash effect) (USD) -13,317 — -94,807 — — — —
Change in payables (cash effect) (USD) -319,237 — -3,000 — — -1.73M 584,609
Dividends paid (cash effect) (USD) -4.36M — 0.00 — — — —
Income taxes paid (cash effect) (USD) — — — — 29,457 85,332 62,999
Share-based compensation (USD) — — — — — 3.78M 3.45M
Operating cash flow before change in receivables (USD) -2.15M — -9.82M — — — —
Free cash flow (OCF - PPE - intangibles) (USD) -3.05M — -10.4M — -32.3M -31.6M -25.6M
Income detail
Total comprehensive income (USD) — — — — — -33.9M -29.5M
Comprehensive income to owners (USD) — — — — — -33.9M -29.5M
Reported Jun 28, 2022 Mar 22, 2023 Jun 28, 2022 Nov 13, 2023 Mar 20, 2025 Mar 25, 2026 Nov 10, 2026

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

September 28, 2026

LEAD, SOUTH DAKOTA – Dakota Gold Corp. (NYSE American: DC) (“Dakota Gold” or the “Company”) is pleased to provide an update on its Richmond Hill Oxide Heap Leach Gold Project (“Richmond Hill” or the “Project”) and Maitland Gold Project (“Maitland”), both located on private land in the Homestake District of South Dakota. The Company has concluded key process and site-layout trade-off studies for the Richmond Hill Pre-Feasibility Study (“PFS”) and received additional assay results that will be incorporated into the Feasibility Study (“FS”) resource update. These milestones provide greater definition for the resource model, process design and infrastructure configuration.

Highlights From This Update Include:

  • Completion of key PFS trade-off studies simplifies execution plan: The Company has completed two important trade-off studies and selected a 0.5-inch (12.7-millimeter) design crush size and a single heap-leach facility located generally within the area identified for Phase 1 in the Initial Assessment with Cash Flow (“IACF”). The decisions reflect favorable metallurgical recovery results and will simplify operations and reduce geotechnical and execution risk relative to a multiple-facility configuration.

  • Final Richmond Hill assays received: The Company has received the final assay results required for the Richmond Hill PFS resource update. The complete assay dataset is being incorporated into the updated resource model and mine plan for inclusion in the upcoming PFS. With the results a total of 42,791 meters (140,389 feet) of drilling from 2025 and 2026 were added to the upcoming resource update to be released in conjunction of the PFS in the fourth quarter of this year.

  • Work on FS underway: The Company is currently operating with two drills to convert additional inferred resource material to reserve category post-PFS into a FS mine plan. A portion of this drilling is dedicated to producing additional samples to complete the FS level of metallurgical variability testing across the dominant lithologies and geo metallurgical domains. The FS is expected to be published mid-2027.

Jack Henris, Chief Executive Officer, President and Director of Dakota Gold, said, “Receipt of the final Richmond Hill assays is an important milestone as we complete the dataset for our upcoming PFS resource update expected to be released in conjunction with our PFS in the fourth quarter of this year. We have also concluded two significant trade-off studies by selecting a 0.5-inch design crush size and a single heap-leach facility in the area contemplated for Phase 1 of the IACF. Together, these decisions support a simpler operating configuration, reduce geotechnical complexity and provide greater definition for the overall PFS design.”

Richmond Hill Process and Site-Layout Trade-Off Studies

Dakota Gold has completed the PFS trade-off evaluation of the primary crushing options and selected a 0.5-inch (12.7-millimeter) design crush size. Recent metallurgical testing indicated modeled ultimate gold recovery for oxide material averaged 80.4% at a 0.5-inch crush size, compared with 75.9% at a 1-inch crush size. The PFS financials will capture this benefit when it is released later this year.

The updated resource informing the PFS will incorporate 333 drill holes completed in 2025 and 2026, representing 30% more drilling data from the prior resource, and will be entirely focused on oxide material. The metallurgical test program results defined oxide material as having a CN/FA ratio ≥0.82 and total sulfur content ≤0.5%. Therefore, the PFS will exclude transition material, which represented roughly 18% of the heap leach material in the prior resource.

The Company has also selected a single heap-leach facility located generally within the area identified for Phase 1 in the IACF, rather than the multiple conceptual heap-leach areas previously considered. The consolidated configuration (see Figure 1) will simplify material handling and solution management, optimize operation and consolidate the geotechnical design and monitoring program within one operational area.

This selection will reduce operational complexity and provide a more integrated approach to heap leach facility construction, stacking, solution collection, and long-term facility management. From a geotechnical perspective, a single facility allows the Project team to focus design, liner system preparation, solution management and monitoring in one principal location. The combined crush-size and heap-location decisions provide important inputs to the PFS capital estimate, operating plan, permitting design and economic model.

Figure 1. Richmond Hill IACF conceptual mine site layout with updated single leach pad location for PFS.

Richmond Hill Final Assays and PFS Integration:

Dakota Gold has received the final assay results from the Richmond Hill drilling datasets required to complete the resource-model update supporting the PFS. The results are being integrated with geological, metallurgical and geochemical information to finalize resource classification, mine sequencing and the production schedule. Completion of this assay dataset closes a key technical workstream for the PFS and provides the basis for the updated resource and reserve evaluation.

The Company is excited to include the completed assay dataset in the upcoming PFS. The updated model will also incorporate the results of the recent metallurgical program, including the strong recovery response from breccia-hosted oxide material, to support recovery assignment, ore routing and mine-sequencing decisions.

Additional assay results, which are reported here (see Table 1), represent 3,002 meters (9,847 ft) of geotechnical drilling conducted after the PFS drilling was completed, as well as Chism Gulch phase 2 definition drilling designed to convert remaining inferred blocks for the FS.

Progress on FS:

Along with the additional drilling in the central Richmond Hill area with oxide-breccia hosted material, the Company has planned additional metallurgical holes to complete the testing as part of the FS. The current planned variability testing scope includes:

  • New metallurgical hole core logging and sample preparation

  • Head sample compositing and characterization

  • Bottle-roll testing

  • Column testing (60 day fixed interval) on 30 to 40 master-composite columns across geometallurgical domains and 4 primary lithologies

  • Select tails deportment as necessary

  • ABA geochemistry, acid mobility testing and modeling, and sulfide reactivity

  • Standard preg rob suite

  • Mercury solution balance

  • Zinc precipitation performance mapping

  • Geotechnical testing on column tails – Compact permeability, direct shear, LA abrasion, and slake durability testing

This round of metallurgical variability testing is in direct support of the FS that complements the suite of testing completed during the PFS, and meets the requirements for adequate statistical representation of material types and quantities in the plan at the FS level. The FS test data will allow us to complete a more rigorous metal recovery model and metal plan which will assist in improved mine planning and sequencing. Expected outputs from this effort will include:

  • Detailed stacking plan development

  • Detailed working recovery model and preliminary metal plan

  • Mine-to-heap modeling that allows for optimized stacking and recovery review iterations

  • Optimized final metal plan, optimized mine schedule, life of plan

Maitland Drilling Update:

Initial drill results have been received representing 791 meters (2,594 feet) of drilling from the 5,578 meter (18,300 feet) campaign to produce a maiden resource for the Tertiary epithermal Unionville Zone (see Table 2). In response to the strong metallurgical results from breccia-hosted oxide material at Richmond Hill, Dakota Gold redirected drilling capacity to the central Richmond Hill area to prioritize definition and metallurgical drilling that can inform Feasibility Study mine sequencing and resource conversion opportunities.

The Company expects to resume drilling at Maitland and complete the planned program for the maiden resource in the first half of 2027. The revised schedule reflects disciplined allocation of drilling resources to near-term technical priorities at Richmond Hill and does not change Dakota Gold’s long-term view of Maitland’s high-grade exploration potential. Additional Maitland results will be reported as assays are received, reviewed and interpreted.

Dakota Gold Releases 2025 Sustainability Report Bull 0 Bear 0 Routine

September 16, 2026

LEAD, SOUTH DAKOTA – Dakota Gold Corp. (NYSE American: DC) is pleased to announce the publication of its 2025 Sustainability Report. The report highlights Dakota Gold’s approach to health and safety, environmental stewardship, community engagement and corporate governance as the company advances its projects in the Homestake District of South Dakota. It also provides stakeholders with an update on the company’s 2025 performance, ongoing initiatives and approach to responsible project development.

Jack Henris, CEO, President and Director of Dakota Gold, commented, “At Dakota Gold, being responsible from the start means making decisions today with the full life of the project in mind. As we advance Richmond Hill toward development, safety, environmental protection, reclamation and closure are being incorporated into our planning and engineering from the beginning. Just as important, we are building a company that is rooted in South Dakota and actively engaged in the communities where our employees live and work. Our 2025 Sustainability Report reflects that approach and our commitment to creating lasting value for the Black Hills and South Dakota for generations to come.”

The full report is available at www.dakotagoldcorp.com

September 10, 2026

LEAD,SOUTHDAKOTA**–**Dakota Gold Corp. (NYSE American: DC) (“Dakota Gold” or the “Company”) is pleased to provide results from the Pre-Feasibility Study (“PFS”) metallurgical test program for its Richmond Hill Oxide Heap Leach Gold Project (“Richmond Hill” or the “Project”) in the Homestake District of South Dakota. Results were generated from a PFS dataset using 24 master-composite column tests that cover the principal lithologic, grade, and oxidation domains at crush sizes of 0.5-inch (12.7 millimeters) and 1-inch (25.4 millimeters) with column leach times varying from 21 to 47 days. These results confirm that Richmond Hill is amenable to heap leaching, with positive gold recoveries of up to 92.0% validating historical test work, and supporting the PFS that remains on track for completion in the fourth quarter of 2026.

Highlights from this Update Include:

  • Oxide material recoveries: Twelve oxide column tests ranged in recoveries from 92.0% to 57.3%, with an unweighted arithmetic average of 74.2%. Breccia oxide material returned gold extraction of 92.0% to 90.7%. Oxide leach cycle times are consistently in the 30-to 40-day nominal range. At 0.5-inch crush size for oxide material, ultimate gold recoveries from heap leaching are expected to range from 90.3% to 70.0%, with an 80.4% unweighted paired domain mean.

Table 1.  Modeled ultimate recoveries segregated by crush size1.

  • Positive material characteristics: Testing to date has shown no discernible issues with compact permeability, clay material, preg-robbing concerns, or any other characteristics that would impede expected operational or metallurgical performance.

  • Additional drilling is underway: Dakota Gold has commenced a definition drill program in the central Project area of Richmond Hill targeting conversion of high recovery breccia-hosted oxide inferred resources to mineral reserves for the Feasibility Study (“FS”). The program is expected to complete approximately 11,000 meters (36,000 feet) of definition drilling during 2026-2027 and the results will support future mine sequencing and optimization opportunities.  (See Figure 2)

Jack Henris, CEO, President and Director of Dakota Gold, said, “We are pleased to have completed our comprehensive metallurgical test program for our PFS, a key step in our process to systematically de-risk the Project through disciplined and detailed technical studies for the responsible development of Richmond Hill. The PFS metallurgical test program results support the conversion of Richmond Hill’s geological variability into a practical recovery model for mine planning and process design. Separating oxide from transition material performance gives the Company a clearer basis for recovery assignment, mine sequencing, ore routing, and process optimization. The strong breccia-hosted material recovery response and the defined crush-size trade-offs are important inputs to selecting a technically-sound, capital-efficient, heap leach flowsheet.”

PFS Metallurgical Test Program

The PFS metallurgical test program builds on historical test work and is designed to support PFS level definition of metallurgical variability. More than 100 holes drilled in 2025 were designed in whole or in part to collect metallurgical samples representative of the rock types, lithologies, and geological formations in the proposed mine plan (Figure 1). Representative material was selected to evaluate 24 to 28 potential geometallurgical domains. Forte Dynamics, Inc. (now part of SLR International Corporation) conducted the PFS metallurgical test program, which includes ore characterization, bottle-roll and column-leach testing, comminution and crushing studies, process optimization, deleterious-element characterization and environmental testing.

Based on these results, the definitions used to classify oxide and transition material, the Company does not expect a significant amount of transition material to be part of the mine plan. Additional work will be undertaken on transition material that may be encountered during the mining of oxides. Recovery information for transition material can be reviewed in the Appendix.

Figure 1. Richmond Hill 2025 metallurgical drill program and potential geometallurgical test zones. Red drill hole symbols identify 2025 metallurgical holes; the outlined areas show potential test domains over the S-K 1300 Initial Assessment resource footprint.

Master-Composite Column Results

A summary of the 12 completed oxide material master-composite column tests conducted for the PFS is shown in Table 2. The results for the 12 completed transition material master-composite column tests can be viewed in the Appendix. These results are laboratory extractions. Commercial recovery assumptions will require scale-up, solution-management modeling, and operating allowances which will be finalized in the FS metallurgical test work.

Table 2. Gold oxide material recovery ranges from the supplied master-composite column dataset. Arithmetic averages are descriptive only and are not weighted by grade, contained metal, or planned PFS tonnage.

Summary Table of Master-Composite Bottle-Roll and Column Results

Table 3. Oxide material bottle-roll (“BRT”) (74 micron) and column test (“CLT”) extractions from the master-composite column dataset.

Table 4. Approximate tonnage distribution in the deposit.

Current Analysis of Crush Size

The crush-size trade-off studies remain active, with the 0.5-inch modeled mean ultimate gold recovery of 80.4% for oxide material, approximately 4.5 percentage points higher than the corresponding 1-inch case. The benefit of the higher recovery will be evaluated against crushing, conveying, and operating costs. The mean modeled recovery at 1 inch is 75.9% for oxide material.

Interpretation and PFS Application

The oxide material provides the stronger overall heap leach gold response, with a 74.2% unweighted average column extraction. The higher modeled ultimate recovery mean is 80.4% at 0.5 inch, followed by 75.9% at 1 inch. Breccia oxide is the strongest performing material tested, followed by Tertiary intrusive and Precambrian oxide; Deadwood oxide is more variable and will require domain-specific recovery assignment, optimization, and sequencing controls. Oxide material is defined as having a CN/FA ratio ≥0.82 and total sulfur content ≤0.5%.

The ultimate recovery schedule will integrate the available column behavior, master- and sub composite bottle-roll results and domain-specific technical judgment. The PFS will reconcile these assignments against resource model tonnage, mine sequence, permeability, cyanide and lime consumption, solution chemistry and capital and operating cost trade-offs before establishing the production-weighted recovery assumptions used in the PFS economic model.

Next Steps for Advancing the FS

  • Complete remaining variability, optimization, load permeability, and environmental test work, including confirmation of recovery behavior in lower performing domains.

  • Finalize the geometallurgical domain model and reconcile sample coverage against the updated PFS resource and mine plan.

  • Complete crush-size and throughput trade-off studies and finalize the PFS to FS process design criteria.

  • Develop production-weighted gold and silver recovery assumptions, together with appropriate commercial scale-up and operating allowances, for the PFS financial model.

  • Complete additional detailed bottle-roll, column test work, and variability testing to inform the FS.

Follow-up Richmond Hill Metallurgical and Definition Drill Program 

Following review of the metallurgical work, Dakota Gold plans to complete approximately 3,800 meters (~12,500 feet) of metallurgical drilling throughout the Project area, and 11,000 meters (~36,000 feet) of definition drilling in the central Project area of Richmond Hill (Figure 2). Mineralization in the central Project area is hosted primarily within breccia, Precambrian, and Tertiary intrusive rock units which have better oxide gold recoveries. The drill program commenced in the third quarter of 2026 and will continue into 2027. Both programs will be informing the FS expected to be published mid-2027.

The metallurgical holes will be drilled to provide material for new column test work. The definition program will have two principal objectives. First, it will target conversion of a significant amount of modeled inferred oxide breccia-hosted mineralized material to reserve category for initial mine sequencing as this type of material had a high recovery of up to 92.0% in the metallurgical test program. Second, the program will add geochemical information including cyanide-soluble gold and multi-element data to supplement the Company’s drilling and historical gold assay drilling database in the area. These supplemented datasets, together with the ongoing metallurgical test results, will inform the recovery and resource model and subsequent mine planning work as the Company transitions to the FS.

Assay results from this program will be incorporated into the updated Richmond Hill resource model in advance of the FS. The expected result is a better defined, metallurgically informed central Project area, with additional resource category conversions where supported by drilling, assays, and geochemical characterization.

Figure 2. Plan map showing location of Richmond Hill planned metallurgical and definition drill program.

About Dakota Gold Corp.

Dakota Gold is a responsible exploration and development company advancing the Richmond Hill Gold Project toward production as soon as 2029, while continuing to define and expand the high-grade underground gold resource potential at the Maitland Gold Project. Both projects are located on private land within the historic Homestake District of South Dakota, one of the most prolific gold mining regions in the United States.

Subscribe to Dakota Gold’s e-mail list at www.dakotagoldcorp.com

to receive the latest news and other Company updates.

Shareholder and Investor Inquiries

For more information, please contact:

Jack Henris

CEO, President and Director

Tel: +1 605-717-2540

Shawn Campbell 

Chief Financial and Development Officer

Tel: +1 778-655-9638

Carling Gaze

Director of Investor Relations

Tel: +1 605-679-7429

Email: [email protected]

Qualified Person and S-K 1300 Disclosure

Barry Carlson, SME Registered Member, Principal Engineer - SLR International Corporation, is the Company’s designated qualified person, as defined in Subpart 1300 of Regulation S-K, for the metallurgical scientific and technical information in this news release and has reviewed and approved that information. The qualified person has verified the data underlying the disclosure by reviewing laboratory certificates, test procedures, metallurgical mass balances and the Company’s quality-control records.

Metallurgical Test Work and Quality Assurance/Quality Control

Samples were selected from drill core and assembled into master- and sub composites to represent lithology, grade class and oxidation state within the potential geometallurgical domains. Metallurgical testing was performed by Forte Dynamics, Inc., a third party laboratory located in Fort Collins, CO. The program includes fire assay and cyanide-soluble head analyses, direct-leach bottle rolls, column-leach tests at nominal P₈₀ crush sizes of 12.7 mm and 25.4 mm, solution assays, residue assays and metallurgical balances. Column tests reported herein ran for 21 to 63 days. Sample custody, preparation, analytical procedures, quality assurance/quality control (QA/QC), and data validation were conducted in accordance with established industry best practices. The laboratory procedures incorporate appropriate sample tracking and chain of custody controls typical of accredited operations, documented sample preparation and analytical protocols, and the use of standards, blanks, and duplicate samples, as applicable. Check assays and review of analytical results are performed as appropriate to verify data quality and consistency. Laboratory procedures and QA/QC practices are designed to meet or exceed generally accepted industry practices for metallurgical test work and to provide reliable and reproducible results.

Forward-Looking Statements

This communication contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. When used in this communication, the words “plan,” “target,” “anticipate,” “believe,” “estimate,” “intend,” “potential,” “will” and “expect” and similar expressions are intended to identify such forward-looking statements. Any express or implied statements contained in this communication that are not statements of historical fact may be deemed to be forward-looking statements, including, without limitation: completion and timing of the PFS and feasibility study; expected metallurgical recoveries and the conversion of laboratory extraction or modeled ultimate recovery into commercial performance; project economics, development and potential production, our expectations regarding additional drilling, metallurgy and modeling; our expectations for the improvement and growth of the mineral resources and potential for conversion of mineral resources into reserves; completion of , permitting; and our overall expectation for the possibility of near-term production at the Richmond Hill project. These forward-looking statements are based on assumptions and expectations that may not be realized and are inherently subject to numerous risks and uncertainties, which could cause actual results to differ materially from these statements. These risks and uncertainties include, among others: the execution and timing of our planned exploration activities; our use and evaluation of historic data; our ability to achieve our strategic goals; the state of the economy and financial markets generally and the effect on our industry; and the market for our common stock. The foregoing list is not exhaustive. For additional information regarding factors that may cause actual results to differ materially from those indicated in our forward-looking statements, we refer you to the risk factors included in Item 1A of the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2025, as updated by annual, quarterly and current reports that we file with the SEC, which are available at www.sec.gov. We caution investors not to place undue reliance on the forward-looking statements contained in this communication. These statements speak only as of the date of this communication, and we undertake no obligation to update or revise these statements, whether as a result of new information, future events or otherwise, except as may be required by law. We do not give any assurance that we will achieve our expectations.

All references to “$” in this communication are to U.S. dollars unless otherwise stated.

Prompts

Dakota Gold Corp. (ticker DC), listed in United States.

Company History

Date Change Detail
Mar 31, 2022 Renamed JR Resources Corp. → DAKOTA GOLD CORP.

ETFs Holding Dakota Gold Corp.

ETF Weight in ETF Shares Market value As of
AVSC 0.01% 76,709 $ 382.011K Nov 16, 2026
AVIE 0.01% 414 $ 2,061.72 Nov 16, 2026
DFAS 0.01% 543,013 $ 2.965M Nov 12, 2026
MSSM 0.00% 2,509 $ 15.255K Aug 31, 2026
DXUV 0.00% 17,624 $ 96.227K Nov 12, 2026
DCOR 0.00% 110,646 $ 604.127K Nov 12, 2026
DFAC 0.00% 183,299 $ 1.001M Nov 12, 2026
DFUS 0.00% 32,023 $ 174.846K Nov 12, 2026
DFAU 0.00% 12,501 $ 68.255K Nov 12, 2026