enCore Energy Corp. is a uranium producer focused on extracting domestic uranium within the United States using In-Situ Recovery (ISR) technology. The company operates two Central Processing Plants (CPPs) in South Texas: the Rosita CPP and the Alta Mesa CPP, where it extracts uranium from sandstone-hosted deposits to produce yellowcake for the nuclear fuel cycle. enCore utilizes a lixiviant comprised of oxygen and sodium bicarbonate to minimize environmental impact. Its project pipeline includes the Dewey Burdock Project in South Dakota and the Gas Hills Project in Wyoming. The company sells uranium through multi-year, hybrid, market-based contracts to support clean energy generation. enCore Energy Corp. was incorporated in 2009.

Summarised from the company's own disclosures, fiscal year ended Mar 2026

Industry Uranium Homepage encoreuranium.com
Sector Energy IR page encoreuranium.com/investors/stock-information
Tags
uranium extraction, in-situ recovery, nuclear fuel cycle, yellowcake production, sandstone-hosted deposits, domestic uranium supply, Rosita Central Processing Plant, Alta Mesa CPP, Dewey Burdock Project, Gas Hills Project, Prompt Fission Neutron (PFN)
Press page encoreuranium.com/news

Metrics

Valuation  
Market cap $ 182.644M
Market cap (USD) $ 182.644M
P/E -2.04
PEG —
P/BV 0.98
P/S 2.90
P/OCF -5.30
P/FCF -4.06
Dividend yield —
Turnover / mcap —
Returns  
ROE -22.1%
ROI -16.8%
ROIC -14.5%
Profit margin -131.7%
Growth  
Revenue growing No
Profits growing No
Revenue up 3y No
Revenue up 5y —
Earnings growth 3y (net profit CAGR) —
Quality  
Profitable No
Margin expanding No
Buying back stock No
Diluting (TTM) Yes
Debt/Equity 59.4%
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 33
Quality score -58.8%
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021
Revenue 43.155M 58.334M 22.148M 4.245M 0
Net profit -56.856M -61.392M -22.386M -16.515M -8.563M
Free cash flow -44.989M -56.552M 14.409M -70.178M -6.642M

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021
Share price 2.48 3.41 3.93 0.85 3.87
Price performance 12m -0.27 -0.13 3.63 -0.34 —

Filed figures

Figure Dec 2021 Dec 2022 Dec 2023 Dec 2024 Dec 2025
Balance sheet detail
Trade receivables (USD) — — — 0.00 4.94M
Borrowings, current (USD) — — — 20.1M 0.00
Lease liabilities (USD) — — 472,000 332,000 3.26M
Cash and deposits (USD) 13.7M 57.1M 7.49M 39.7M 52.4M
Intangible assets (USD) — — 514,000 471,000 1.47M
Right-of-use assets (USD) — — 459,000 310,000 3.08M
Net debt (borrowings + leases - cash) (USD) — — — -19.3M -49.1M
Cash flow detail
Operating cash flow (USD) — -20.3M -23M -45.2M -25M
Purchases of property, plant and equipment (USD) — -980,000 -7.73M -11.3M -20M
Change in receivables (cash effect) (USD) — — — 0.00 -4.94M
Change in inventories (cash effect) (USD) — -344,000 2.99M -7.58M 11.1M
Change in payables (cash effect) (USD) — -4.24M 14,000 4.08M 4.45M
Interest paid (cash effect) (USD) — — — 0.00 -2.33M
Income taxes paid (cash effect) (USD) — — — -38,000 -108,000
Share-based compensation (USD) — 4.33M 3.46M 4.79M 4.2M
Operating cash flow before change in receivables (USD) — — — -45.2M -20M
Free cash flow (OCF - PPE - intangibles) (USD) — -21.3M -30.7M -56.6M -45M
Income detail
Total comprehensive income (USD) — -24.6M -25.2M -69.8M -62.1M
Comprehensive income to owners (USD) — -24.6M -25.2M -63.2M -55.9M
Reported Mar 3, 2025 Mar 3, 2025 Mar 3, 2025 Mar 31, 2026 Mar 31, 2026

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

DALLAS, Nov. 12, 2026 – enCore Energy Corp. (NASDAQ: EU) (TSXV: EU) (the “Company” or “enCore”), America’s Clean Energy Company™, today announced its financial and operational results for the three and nine months ended September 30, 2026. Third quarter revenue increased 88% year over year to $16.7 million on higher uranium deliveries and a stronger average realized price, while the Company continued wellfield development at Alta Mesa and Upper Spring Creek ahead of final regulatory authorizations and took steps to reduce costs and align spending with permitting timelines.

“2026 has been a challenging year for enCore, and we have responded by reducing costs and focusing our capital where it matters most,” said Chief Executive Officer Rich Little. “We optimized operations to align spending with permitting timelines, while continuing to build the wellfields and infrastructure that underpin our next phase of extraction. The first phase of the Upper Spring Creek facility and wellfield and the Alta Mesa wellfield 3 Extension are complete and awaiting receipt of final TCEQ approvals.

October 27, 2026 Bull 3 Bear 0 Product/operations

enCore Energy Reaches Final Stage of Permitting at Upper Spring Creek; Alta Mesa PAA-8 and PAA-3 Extension Remain on Schedule

enCore Energy Corp. logo

NEWS RELEASE
NASDAQ:EU
TSXV: EU

NEWS RELEASE
NASDAQ: EU
TSXV: EU

October 27, 2026

www.encoreuranium.com

Download PDF

DALLAS, Oct. 27, 2026 /CNW/ — enCore Energy Corp. (NASDAQ: EU) (TSXV: EU) (the “Company” or “enCore”), America’s Clean Energy Company™, today provided an update on permitting for the three new production areas that underpin its South Texas extraction outlook. The Production Area Authorization (“PAA”) for the first production area at the 100%-owned Upper Spring Creek In-Situ Recovery (“ISR”) Uranium Project (“USC PAA-1”) has completed the Texas Commission on Environmental Quality’s (“TCEQ”) technical review and public notice process, with final authorization expected on or before November 13, 2026. At the Alta Mesa ISR Uranium Project, the TCEQ is working to complete its technical review of both the PAA-8 application and the PAA-3 Extension amendment. Both remain on schedule and are expected before the end of the year.

Highlights

  • USC PAA-1 is in the final stage of permitting: the public comment period on the Final Draft Permit closed on October 19, 2026, and final TCEQ authorization is expected on or before November 13, 2026, an accelerated date from guidance issued in the Company’s Q2-2026 guidance.
  • USC is built and ready: the Satellite Ion Exchange (“IX”) Plant and first production wellfield are constructed and already expensed. Uranium extraction is expected to begin shortly after receipt of the PAA, supplying uranium-loaded resin feed to the Company’s fully licensed Rosita Central Processing Plant (“CPP”).
  • Alta Mesa PAA-8 and PAA-3 extension continue to work their way through TCEQ technical review and the wellfields remain on schedule as announced in our Q2 report with final permitting expected by the end of the year for PAA3 Extension and early in the new year for PAA8. With legislative changes to the public notice and hearing procedures implemented May 1, 2026, there will be no opportunity for a public hearing which could have otherwise delayed the process. 
  • Together, these three production areas are expected to renew enCore’s extraction growth profile into 2027.

Richard Little, Chief Executive Officer, stated: “Permitting has been the last step between the infrastructure we have built in South Texas and new production. We are prepared to initiate injection and recovery operations at Upper Spring Creek as soon as the final permit is received. At Upper Spring Creek, the initial designed capacity of the plant and first wellfield are constructed with a large majority of these expenses now behind us. All that is remaining now is a final review process of the permit along with the approval of our disposal well completion report. PAA-8 and the PAA-3 Extension at Alta Mesa are following the same path. These are the wellfields that support our improved extraction outlook for 2027, and we look forward to bringing them online.”

Upper Spring Creek PAA-1: Final Authorization Expected Within Weeks

A PAA is the TCEQ authorization that permits ISR uranium extraction within a defined wellfield area. Receipt of USC PAA-1 will allow enCore to begin ISR operations at Upper Spring Creek, the largest satellite facility the Company has built to date. The USC PAA-1 application was submitted in May 2025 and progressed through the TCEQ’s administrative review, a technical review that included seven revision cycles, and two public notice periods. Key milestones are summarized below:

Date Milestone
May 27, 2025 PAA-1 application submitted to TCEQ
May 29, 2025 USC added to the Company’s TCEQ radioactive material license, allowing construction of wellfields and the Satellite IX Plant (previously announced)
October 21, 2025 TCEQ administrative review completed
November 13, 2025 Notice of Receipt of Application and Intent to Obtain Permit (“NORI”) published; initial public comment period opened
August 28, 2026 Initial Draft Permit issued following technical review and seven revision cycles
September 23, 2026 Final Draft Permit published with Notice of Application and Preliminary Decision (“NAPD”)
October 19, 2026 Public comment period closed (grace period for comments postmarked by this date ended October 24, 2026)
Oct. 29 – Nov. 13, 2026 Final TCEQ authorization signature expected

Following the close of the notice period, the permit requires a final authorization signature from the TCEQ. Upon receipt, the Company expects to commence uranium extraction from the first USC wellfield, with loaded resin trucked to the Rosita CPP for processing into yellowcake.

To support optimal production, the USC project also requires TCEQ operational approval of its Waste Disposal Well (“WDW”), which will handle the bleed stream from ISR production operations. The WDW has been constructed and is in final testing and TCEQ review.

About the Upper Spring Creek ISR Project

The 100% Company-owned Project consists of a Satellite IX Plant and wellfield and is a key component of enCore’s larger South Texas Uranium Project. This satellite facility will operate in conjunction with multiple future potential production units within the historic Clay West uranium district. The Project was previously held by Signal Equities LLC, which previously had licensed and permitted the property including the aquifer exemption as an ISR uranium project prior to 2020. The Company acquired the Project in December 2020. The uranium-mineralized sands at the Project lie within the Oakville Formation at depths typically between 300 and 450 feet below surface, allowing for efficient and economical uranium recovery with ISR methods.

Technical Disclosure and Qualified Person

Dain McCoig, P.E., MBA, enCore’s Chief Operating Officer, and a Qualified Person under Canadian National Instrument 43-101 and S-K 1300, has reviewed and approved the technical disclosure in this news release on behalf of the Company.

About enCore Energy Corp.

enCore Energy Corp., America’s Clean Energy Company™, is committed to providing clean, reliable, and affordable uranium to fuel the rapidly expanding U.S. nuclear energy needs. enCore’s team is led by industry experts with extensive knowledge and experience in all aspects of uranium ISR operations and the nuclear fuel cycle. enCore solely utilizes ISR for uranium extraction, a minimally invasive, eco-friendly, and economically competitive approach to mineral extraction technology co-developed by enCore’s leadership.

Building on enCore’s demonstrated and continuing success in South Texas, future projects in enCore’s planned project pipeline include the expansion of Alta Mesa to include the Alta Mesa East property, the Dewey Burdock project in South Dakota, and the Gas Hills project in Wyoming. The Company holds other assets, including non-core assets and proprietary databases. enCore is committed to working with local communities and indigenous governments to create positive impacts from corporate projects.

Cautionary Note Regarding Forward-Looking Statements:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

Revisit consent button

We value your privacy

We use cookies to enhance your browsing experience, serve personalized ads or content, and analyze our traffic. By clicking “Accept All,” you consent to our use of cookies. Cookie Policy

Customize Reject All Accept All

Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... Show more

NecessaryAlways Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

  • Cookie

    VISITOR_PRIVACY_METADATA

  • Duration

    6 months

  • Description

    YouTube sets this cookie to store the user's cookie consent state for the current domain.

  • Cookie

    elementor

  • Duration

    Never Expires

  • Description

    The website's WordPress theme uses this cookie. It allows the website owner to implement or change the website's content in real-time.

  • Cookie

    wpEmojiSettingsSupports

  • Duration

    session

  • Description

    WordPress sets this cookie when a user interacts with emojis on a WordPress site. It helps determine if the user's browser can display emojis properly.

  • Cookie

    cookieyes-consent

  • Duration

    1 year

  • Description

    CookieYes sets this cookie to remember users' consent preferences so that their preferences are respected on subsequent visits to this site. It does not collect or store any personal information about the site visitors.

  • Cookie

    AWSALBCORS

  • Duration

    7 days

  • Description

    Amazon Web Services set this cookie for load balancing.

  • Cookie

    __cf_bm

  • Duration

    1 hour

  • Description

    This cookie, set by Cloudflare, is used to support Cloudflare Bot Management.

  • Cookie

    rc::a

  • Duration

    Never Expires

  • Description

    This cookie is set by the Google recaptcha service to identify bots to protect the website against malicious spam attacks.

  • Cookie

    rc::c

  • Duration

    session

  • Description

    This cookie is set by the Google recaptcha service to identify bots to protect the website against malicious spam attacks

  • Cookie

    _cfuvid

  • Duration

    session

  • Description

    Cloudflare sets this cookie to track users across sessions to optimize user experience by maintaining session consistency and providing personalized services

Functional

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

  • Cookie

    VISITOR_INFO1_LIVE

  • Duration

    6 months

  • Description

    A cookie set by YouTube to measure bandwidth that determines whether the user gets the new or old player interface.

  • Cookie

    yt-remote-connected-devices

  • Duration

    Never Expires

  • Description

    YouTube sets this cookie to store the user's video preferences using embedded YouTube videos.

  • Cookie

    ytidb::LAST_RESULT_ENTRY_KEY

  • Duration

    Never Expires

  • Description

    The cookie ytidb::LAST_RESULT_ENTRY_KEY is used by YouTube to store the last search result entry that was clicked by the user. This information is used to improve the user experience by providing more relevant search results in the future.

  • Cookie

    yt-remote-device-id

  • Duration

    Never Expires

  • Description

    YouTube sets this cookie to store the user's video preferences using embedded YouTube videos.

  • Cookie

    visitorId

  • Duration

    Never Expires

  • Description

    ZoomInfo sets this cookie to identify a user.

  • Cookie

    yt-remote-session-name

  • Duration

    session

  • Description

    The yt-remote-session-name cookie is used by YouTube to store the user's video player preferences using embedded YouTube video.

  • Cookie

    yt-remote-fast-check-period

  • Duration

    session

  • Description

    The yt-remote-fast-check-period cookie is used by YouTube to store the user's video player preferences for embedded YouTube videos.

  • Cookie

    yt-remote-session-app

  • Duration

    session

  • Description

    The yt-remote-session-app cookie is used by YouTube to store user preferences and information about the interface of the embedded YouTube video player.

  • Cookie

    yt-remote-cast-available

  • Duration

    session

  • Description

    The yt-remote-cast-available cookie is used to store the user's preferences regarding whether casting is available on their YouTube video player.

  • Cookie

    yt-remote-cast-installed

  • Duration

    session

  • Description

    The yt-remote-cast-installed cookie is used to store the user's video player preferences using embedded YouTube video.

Analytics

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

  • Cookie

    _ga_*

  • Duration

    1 year 1 month 4 days

  • Description

    Google Analytics sets this cookie to store and count page views.

  • Cookie

    _ga

  • Duration

    1 year 1 month 4 days

  • Description

    Google Analytics sets this cookie to calculate visitor, session and campaign data and track site usage for the site's analytics report. The cookie stores information anonymously and assigns a randomly generated number to recognise unique visitors.

  • Cookie

    YSC

  • Duration

    session

  • Description

    YSC cookie is set by Youtube and is used to track the views of embedded videos on Youtube pages.

Performance

Performance cookies are used to understand and analyse the key performance indexes of the website which helps in delivering a better user experience for the visitors.

  • Cookie

    AWSALB

  • Duration

    7 days

  • Description

    AWSALB is an application load balancer cookie set by Amazon Web Services to map the session to the target.

Advertisement

Advertisement cookies are used to provide visitors with customised advertisements based on the pages you visited previously and to analyse the effectiveness of the ad campaigns.

  • Cookie

    yt.innertube::nextId

  • Duration

    Never Expires

  • Description

    YouTube sets this cookie to register a unique ID to store data on what videos from YouTube the user has seen.

  • Cookie

    yt.innertube::requests

  • Duration

    Never Expires

  • Description

    YouTube sets this cookie to register a unique ID to store data on what videos from YouTube the user has seen. 

  • Cookie

    c

  • Duration

    6 months 2 days

  • Description

    Rubicon Project sets this cookie to control the synchronization of user identification and the exchange of user data between various ad services.

Reject All Save My Preferences Accept All

Skip to content

TSX.V:EU | NASDAQ:EU  

Facebook X YouTube Instagram Linkedin

enCore Energy Corp. logoenCore Energy Corp. logo

TSX.V:EU | NASDAQ:EU  

enCore Energy Corp. logoenCore Energy Corp. logo

Toggle Menu

October 27, 2026

enCore Energy Reaches Final Stage of Permitting at Upper Spring Creek; Alta Mesa PAA-8 and PAA-3 Extension Remain on Schedule

enCore Energy Corp. logo

NEWS RELEASE
NASDAQ:EU
TSXV: EU

NEWS RELEASE
NASDAQ: EU
TSXV: EU

October 27, 2026

www.encoreuranium.com

Download PDF

DALLAS, Oct. 27, 2026 /CNW/ — enCore Energy Corp. (NASDAQ: EU) (TSXV: EU) (the “Company” or “enCore”), America’s Clean Energy Company™, today provided an update on permitting for the three new production areas that underpin its South Texas extraction outlook. The Production Area Authorization (“PAA”) for the first production area at the 100%-owned Upper Spring Creek In-Situ Recovery (“ISR”) Uranium Project (“USC PAA-1”) has completed the Texas Commission on Environmental Quality’s (“TCEQ”) technical review and public notice process, with final authorization expected on or before November 13, 2026. At the Alta Mesa ISR Uranium Project, the TCEQ is working to complete its technical review of both the PAA-8 application and the PAA-3 Extension amendment. Both remain on schedule and are expected before the end of the year.

Highlights

  • USC PAA-1 is in the final stage of permitting: the public comment period on the Final Draft Permit closed on October 19, 2026, and final TCEQ authorization is expected on or before November 13, 2026, an accelerated date from guidance issued in the Company’s Q2-2026 guidance.
  • USC is built and ready: the Satellite Ion Exchange (“IX”) Plant and first production wellfield are constructed and already expensed. Uranium extraction is expected to begin shortly after receipt of the PAA, supplying uranium-loaded resin feed to the Company’s fully licensed Rosita Central Processing Plant (“CPP”).
  • Alta Mesa PAA-8 and PAA-3 extension continue to work their way through TCEQ technical review and the wellfields remain on schedule as announced in our Q2 report with final permitting expected by the end of the year for PAA3 Extension and early in the new year for PAA8. With legislative changes to the public notice and hearing procedures implemented May 1, 2026, there will be no opportunity for a public hearing which could have otherwise delayed the process. 
  • Together, these three production areas are expected to renew enCore’s extraction growth profile into 2027.

Richard Little, Chief Executive Officer, stated: “Permitting has been the last step between the infrastructure we have built in South Texas and new production. We are prepared to initiate injection and recovery operations at Upper Spring Creek as soon as the final permit is received. At Upper Spring Creek, the initial designed capacity of the plant and first wellfield are constructed with a large majority of these expenses now behind us. All that is remaining now is a final review process of the permit along with the approval of our disposal well completion report. PAA-8 and the PAA-3 Extension at Alta Mesa are following the same path. These are the wellfields that support our improved extraction outlook for 2027, and we look forward to bringing them online.”

Upper Spring Creek PAA-1: Final Authorization Expected Within Weeks

A PAA is the TCEQ authorization that permits ISR uranium extraction within a defined wellfield area. Receipt of USC PAA-1 will allow enCore to begin ISR operations at Upper Spring Creek, the largest satellite facility the Company has built to date. The USC PAA-1 application was submitted in May 2025 and progressed through the TCEQ’s administrative review, a technical review that included seven revision cycles, and two public notice periods. Key milestones are summarized below:

Date Milestone
May 27, 2025 PAA-1 application submitted to TCEQ
May 29, 2025 USC added to the Company’s TCEQ radioactive material license, allowing construction of wellfields and the Satellite IX Plant (previously announced)
October 21, 2025 TCEQ administrative review completed
November 13, 2025 Notice of Receipt of Application and Intent to Obtain Permit (“NORI”) published; initial public comment period opened
August 28, 2026 Initial Draft Permit issued following technical review and seven revision cycles
September 23, 2026 Final Draft Permit published with Notice of Application and Preliminary Decision (“NAPD”)
October 19, 2026 Public comment period closed (grace period for comments postmarked by this date ended October 24, 2026)
Oct. 29 – Nov. 13, 2026 Final TCEQ authorization signature expected

Following the close of the notice period, the permit requires a final authorization signature from the TCEQ. Upon receipt, the Company expects to commence uranium extraction from the first USC wellfield, with loaded resin trucked to the Rosita CPP for processing into yellowcake.

To support optimal production, the USC project also requires TCEQ operational approval of its Waste Disposal Well (“WDW”), which will handle the bleed stream from ISR production operations. The WDW has been constructed and is in final testing and TCEQ review.

About the Upper Spring Creek ISR Project

The 100% Company-owned Project consists of a Satellite IX Plant and wellfield and is a key component of enCore’s larger South Texas Uranium Project. This satellite facility will operate in conjunction with multiple future potential production units within the historic Clay West uranium district. The Project was previously held by Signal Equities LLC, which previously had licensed and permitted the property including the aquifer exemption as an ISR uranium project prior to 2020. The Company acquired the Project in December 2020. The uranium-mineralized sands at the Project lie within the Oakville Formation at depths typically between 300 and 450 feet below surface, allowing for efficient and economical uranium recovery with ISR methods.

Technical Disclosure and Qualified Person

Dain McCoig, P.E., MBA, enCore’s Chief Operating Officer, and a Qualified Person under Canadian National Instrument 43-101 and S-K 1300, has reviewed and approved the technical disclosure in this news release on behalf of the Company.

About enCore Energy Corp.

enCore Energy Corp., America’s Clean Energy Company™, is committed to providing clean, reliable, and affordable uranium to fuel the rapidly expanding U.S. nuclear energy needs. enCore’s team is led by industry experts with extensive knowledge and experience in all aspects of uranium ISR operations and the nuclear fuel cycle. enCore solely utilizes ISR for uranium extraction, a minimally invasive, eco-friendly, and economically competitive approach to mineral extraction technology co-developed by enCore’s leadership.

Building on enCore’s demonstrated and continuing success in South Texas, future projects in enCore’s planned project pipeline include the expansion of Alta Mesa to include the Alta Mesa East property, the Dewey Burdock project in South Dakota, and the Gas Hills project in Wyoming. The Company holds other assets, including non-core assets and proprietary databases. enCore is committed to working with local communities and indigenous governments to create positive impacts from corporate projects.

Cautionary Note Regarding Forward-Looking Statements:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

Prompts

enCore Energy Corp. (ticker EU), listed in United States.

Company History

Date Change Detail
Mar 1, 2017 Renamed TIGRIS URANIUM CORP. → ENCORE ENERGY CORP.

ETFs Holding enCore Energy Corp.

ETF Weight in ETF Shares Market value As of
AIPO 0.18% 2,559,244 $ 1.379M Nov 13, 2026
CCSO 0.01% 10,783 $ 5,528.44 Nov 17, 2026

Securities

Ticker Type Class Market Exchange Last price Price date
EU canonical Common share — US nasdaq 0.94 USD 2026-10-12
EU Common share — CA tsx — —