REalloys Inc. is a U.S. manufacturer of rare earth alloys and permanent magnets, operating a vertically integrated supply chain that spans mining, recycling, oxide production, metallization, alloying, and magnet manufacturing. The company produces NdFeB and SmCo magnets for applications in defense, electrification, and renewable energy systems. REalloys utilizes a hydrofluoric acid-free metallization process and partners with SRC for uranium and thorium removal and solvent extraction. Its feedstock sources include primary ores from Hoidas Lake in Canada and the St. George Araxá project in Brazil, as well as secondary sources such as recycled magnets, e-waste, and lamp phosphors. The company plans to begin production in 2027.

Summarised from the company's own disclosures, fiscal year ended Oct 2026

Industry Other Industrial Metals & Mining Homepage realloys.com
Sector Basic Materials IR page realloys.com/investors
Tags
rare earth elements, permanent magnets, ndfeb magnets, smco magnets, metallization, alloying, solvent extraction, uranium removal, thorium removal, defense materials, renewable energy components, electrification, SRC, PMT, Hoidas Lake, St. George Araxá, NdFeB, SmCo
Press page —

Metrics

Valuation  
Market cap $ 567.153M
Market cap (USD) $ 567.153M
P/E -2.40
PEG —
P/BV 3.19
P/S 222.29
P/OCF -23.69
P/FCF -803.65
Dividend yield —
Turnover / mcap —
Returns  
ROE -80.1%
ROI -78.2%
ROIC -53.4%
Profit margin -182.1%
Growth  
Revenue growing No
Profits growing No
Revenue up 3y No
Revenue up 5y No
Earnings growth 3y (net profit CAGR) —
Quality  
Profitable No
Margin expanding No
Buying back stock No
Diluting (TTM) —
Debt/Equity 0.15%
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 24
Quality score -76.5%
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021 FY 2020 FY 2019 FY 2018 FY 2017 FY 2016 FY 2015 FY 2014 FY 2013
Revenue 2.431M 2.567M 3.106M 4.959M 6.112M 3.368M 1.063M 692.803K 910.705K 94.668K 0 — 0
Net profit -4.426M -3.471M -4.664M -5.02M -2.616M -354.911K -2.983M -1.152M -1.262M -812.333K -423.48K -23.212K -12.291K
Free cash flow — -705.725K -3.169M -4.351M -736.397K 142.281K -712.579K -501.266K -714.636K — — — —

Filed figures

Figure Dec 2016 Dec 2017 Dec 2018 Dec 2019 Dec 2020 Dec 2021 Dec 2022 Dec 2023 Dec 2024 Dec 2025
Balance sheet detail
Trade receivables (USD) — — 3,719 5,745 17,990 18,585 59,613 18,212 7,217 20,148
↳ YoY growth +54.5% +213.1% +3.3% +220.8% -69.4% -60.4% +179.2%
↳ 5y CAGR +37.4% +4.7% +2.3%
Borrowings, current (USD) — 0.00 — 1.04M 399,614 — — — — —
Borrowings, non-current (USD) — 0.00 — 0.00 890,148 — — — — 154,000
Lease liabilities (USD) — — — — — 398,271 335,641 352,235 294,174 228,785
Cash and deposits (USD) 703,638 — — — — — — — 113,000 2.82M
Intangible assets (USD) — — — — — — — — — 1.32M
Right-of-use assets (USD) — — — — — — — — — 602,000
Net debt (borrowings + leases - cash) (USD) — — — — — — — — — -2.13M
Cash flow detail
Operating cash flow (USD) -862,423 -691,872 -472,273 -710,992 143,580 -672,485 -4.29M -3.17M -705,725 -3.16M
Purchases of property, plant and equipment (USD) -6,535 -22,764 -28,993 -1,587 -1,299 -63,912 -65,941 -2,605 0.00 —
Change in receivables (cash effect) (USD) 1,567 -3,544 -67,197 -2,026 -12,245 -595 -41,028 41,401 10,995 -12,931
Change in inventories (cash effect) (USD) — — — — -17,661 4,094 -1,897 12,000 0.00 —
Change in payables (cash effect) (USD) 43,131 295,829 157,028 107,151 -279,742 233,070 144,484 124,555 667,229 -198,136
Share buybacks (cash effect) (USD) 100,000 0.00 — — — — — — — —
Interest paid (cash effect) (USD) — — — -2,000 -186,516 -139,373 -103,473 -552 -264 -1,590
Income taxes paid (cash effect) (USD) 0.00 — — — 0.00 0.00 0.00 0.00 0.00 0.00
Share-based compensation (USD) 0.00 0.00 0.00 0.00 0.00 684,520 482,460 1.45M 368,662 1.37M
Operating cash flow before change in receivables (USD) -863,990 -688,328 -405,076 -708,966 155,825 -671,890 -4.24M -3.21M -716,720 -3.15M
Free cash flow (OCF - PPE - intangibles) (USD) -868,958 -714,636 -501,266 -712,579 142,281 -736,397 -4.35M -3.17M -705,725 —
Income detail
Provision for credit losses (USD) — — 68,589 — — — — — — —
Reported Apr 17, 2018 Aug 20, 2018 Apr 16, 2020 Mar 31, 2021 Mar 31, 2022 Apr 14, 2023 Apr 14, 2023 Apr 1, 2024 May 20, 2026 May 20, 2026

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

REalloys Reports Third Quarter 2026 Results Bull 4 Bear 0 Results

Executes term sheet with the U.S. Army for a heavy rare earth processing facility at Tooele Army Depot; advances SRC metallization and Rare Earth Processing Facility programs; outlines steps toward targeted initial U.S. magnet production by 2030; $116.2 million of cash at quarter-end

● Subsequent to quarter-end, executed a non-binding term sheet with the Department of the Army setting out the principal terms for negotiating a definitive Enhanced Use Lease for a heavy rare earth processing facility on approximately 200 acres at Tooele Army Depot, Utah

● Advanced the Heavy Rare Earth Metallization Facility, targeting commissioning in the first quarter of 2028 with targeted capacity of approximately 50 tonnes of annual dysprosium and terbium oxide

● Targeting North American rare earth metal production, with access to NdPr metallization capability at SRC expected beginning in the first quarter of 2027 and dysprosium and terbium metal output from the Company’s metallization facility expected in the first half of 2028, addressing the limited North American production of rare earth metals

● Provided additional detail on the Company’s mine-to-magnet strategy and the steps toward a targ

Appointment adds rare-earth project execution experience and strengthens collaboration with SRC as REalloys advances commercialization and its U.S. mine-to-magnet strategy.

EUCLID, Ohio, Sept. 29, 2026 (GLOBE NEWSWIRE) — REalloys Inc. (NASDAQ: ALOY) (“REalloys” or the “Company”), an integrated U.S. rare-earth materials and permanent magnet company, today provided additional details regarding the previously announced appointment of Dr. Muhammad Imran, Ph.D., P.Eng., C.Dir., as Chief Operating Officer. As previously disclosed, Dr. Imran’s appointment became effective September 1, 2026.

Dr. Imran has more than 17 years of experience at the SRC, most recently as Chief Technology Officer and Vice President. Since 2020, he led SRC’s Rare Earth Element Division, playing a key leadership role within the multidisciplinary team responsible for developing SRC’s Rare Earth Processing Facility in Saskatoon, Saskatchewan.

His appointment builds on an established commercial relationship that combines SRC’s proprietary processing technologies, technical expertise and project delivery capabilities with REalloys’ downstream manufacturing and market development activities. The relationship supports commercialization of SRC’s technologies and production while advancing REalloys’ access to North American rare-earth materials.

“Muhammad brings valuable experience in rare-earth technology development, scale-up and capital-project execution,” said Lipi Sternheim, Chief Executive Officer of REalloys. “His understanding of SRC’s processing platform and experience working with its technical teams will help us coordinate effectively as we advance our contracted projects. SRC’s continuing technology leadership and delivery capabilities are central to our near-term commercialization plans, and Muhammad’s appointment strengthens our ability to translate that partnership into commercial progress.”

SRC’s Rare Earth Processing Facility is being developed as one of North America’s first integrated rare-earth processing platforms, spanning hydrometallurgical processing, separation and metallization. SRC’s experienced team continues to advance the facility through commissioning and toward integrated commercial production in 2027.

At SRC, Dr. Imran helped build and lead multidisciplinary teams advancing SRC’s proprietary rare-earth processing technologies through development, scale-up and commercialization. These teams designed and fabricated more than 400 custom solvent-extraction cells, supporting separation capabilities for NdPr and heavy rare-earth products, including dysprosium and terbium, and advanced automated metallization technology for producing high-purity rare-earth metals.

Dr. Imran also helped shape a technology strategy incorporating automation, advanced process control and AI-enabled process optimization. SRC’s scientists, engineers and technical specialists continue to develop these capabilities and deliver the facility and associated projects.

**Supporting Near-Term Commercialization

**Dr. Imran’s appointment comes as REalloys advances projects with SRC intended to support its near-term rare-earth supply and longer-term manufacturing strategy.

Through the Company’s strategic relationship with SRC, approximately 150 metric tons per year of NdPr metallization capacity is targeted for commissioning in the first quarter of 2027, followed by planned fully integrated production from monazite concentrate through separated rare-earth products to metals in the third quarter of 2027. These targets remain subject to successful project execution, commissioning and production ramp-up.

Dr. Imran will lead REalloys’ participation in its projects with SRC, working closely with SRC’s leadership and technical teams on project requirements, execution interfaces and commercial readiness, including the planned light and heavy rare-earth metallization facilities. SRC will continue to lead delivery of its contracted technology development, engineering and commissioning responsibilities.

Under existing offtake agreements, REalloys has contracted to purchase the majority of SRC’s planned production of specified rare-earth products, including NdPr metal and dysprosium and terbium oxides, within the quantities and term covered by those agreements. The arrangement provides SRC with an anchor customer for its production and gives REalloys a potential source of supply to support downstream manufacturing and customer sales.

As production ramps up, deliveries under these agreements are expected to support REalloys’ revenue generation from SRC-supplied materials while the Company develops its broader mine-to-magnet platform. The organizations’ complementary roles connect Canadian processing innovation and production with U.S. downstream manufacturing and market opportunities.

**Advancing REalloys’ Operational Strategy

**As Chief Operating Officer, Dr. Imran will lead REalloys’ engineering and processing activities, capital-project execution, technology scale-up, supply-chain development and advancement of its integrated mine-to-magnet platform.

REalloys is developing processing infrastructure intended to utilize diverse domestic, allied and recycled feedstocks, advancing capabilities across rare-earth separation, oxide production, metallization and permanent magnet manufacturing.

“North America has significant rare-earth resources. The critical challenge is building the industrial infrastructure and technical capabilities needed to transform those resources into separated products, metals and ultimately magnets,” said Dr. Imran. “At SRC, I had the privilege of helping lead a multidisciplinary team developing those capabilities. I look forward to continuing to work closely with that team in my new role, connecting SRC’s processing and technology expertise with REalloys’ downstream manufacturing and commercial objectives. Effective collaboration between our organizations will be important as we advance these projects and build toward larger-scale production.”

Dr. Imran holds a Ph.D. and MASc in Chemical Engineering and the Professional Engineer (P.Eng.) and Chartered Director (C.Dir.) designations. His experience combines rare-earth and chemical-processing expertise with technology commercialization and execution of complex industrial projects.

About REalloys

REalloys Inc.

(NASDAQ: ALOY

) is a U.S.-based rare earth materials company executing a mine-to-magnet strategy across upstream feedstock, midstream separation and metallization, and downstream magnet manufacturing. REalloys is focused on delivering qualified, allied-nation rare earth metals and alloys including dysprosium, terbium, praseodymium and neodymium to the U.S. Department of Defense, the U.S. Department of Energy, NASA, the U.S. Defense Industrial Base, and the broader U.S. Organic Industrial Base.

For more information, please visit www.REalloys.com

or email [email protected]

.

Safe Harbor Statement and Forward-Looking Statements

This press release contains “forward-looking statements” within the meaning of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995. Forward-looking statements include, but are not limited to, statements regarding REalloys’ commercialization strategy; the anticipated commissioning and production ramp of rare-earth processing and metallization capabilities at the Saskatchewan Research Council (“SRC”); the targeted commissioning of approximately 150 metric tons per year of NdPr metallization capacity in the first quarter of 2027; the planned commencement of integrated production from monazite concentrate through separated rare-earth products and metal in the third quarter of 2027; REalloys’ anticipated access to and commercialization of SRC production; the timing and potential generation of commercial revenues; the development, scale-up and operation of REalloys’ rare-earth processing, metallization and permanent-magnet manufacturing capabilities; and the anticipated contributions of Dr. Muhammad Imran to these activities.

These forward-looking statements are based on current expectations, estimates, projections, and assumptions that involve significant risks and uncertainties. Actual results may differ materially from those expressed or implied by these forward-looking statements due to a variety of factors, including, but not limited to: construction, installation, commissioning and production-ramp risks; delays in achieving targeted production capacity or product specifications; technological and operational challenges; the availability, quality and cost of rare-earth feedstocks; supply-chain disruptions; fluctuations in rare-earth prices and customer demand; the ability to successfully commercialize and sell rare-earth products; the availability of financing and government support; changes in market conditions; changes in applicable laws, regulations or government policies; and other risks described from time to time in REalloys’ filings with the U.S. Securities and Exchange Commission (“SEC”), including its Annual Report on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and other filings.

There can be no assurance that SRC’s planned commissioning, production ramp or integrated monazite-to-metal production will occur within the anticipated timeframes or achieve the targeted production capacities, or that such production will result in commercial revenues to REalloys at the levels or within the timeframes currently anticipated.

Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this press release. Except as required by applicable law, REalloys undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

REalloys Reports Second Quarter 2026 Results Bull 3 Bear 4 Results

Saskatchewan Research Council (“SRC”) Rare Earth Processing Facility upgrade and Metallization Facility fully funded; $122.4 million of cash at quarter-end; advances U.S. Army Enhanced Use Lease negotiations at Tooele Army Depot

  • Fully funded the upgrade of SRC’s Rare Earth Processing Facility, targeting approximately 525 tonnes of NdPr metal, 30 tonnes of dysprosium oxide and 15 tonnes of terbium oxide of annual capacity

  • Advanced the fully funded Heavy Rare Earth Metallization Facility, targeting commissioning in the first quarter of 2028 with approximately 50 tonnes of annual dysprosium and terbium oxide capacity

  • Closed a $100.0 million private placement of common stock in June 2026, ending the quarter with $122.4 million in cash

  • Selected by the U.S. Army for exclusive negotiations toward a long-term Enhanced Use Lease at Tooele Army Depot, Utah, to develop heavy rare earth processing facilities

BOCA RATON, Fla., Aug. 13, 2026 (GLOBE NEWSWIRE) — REalloys Inc. (Nasdaq: ALOY) (the “Company” or “REalloys”), today reported results for the second quarter ended June 30, 2026. Net revenues were $0.8 million, compared with $0.4 million in the second quarter of 2025, and the Company reported a net loss of $36.8 million, or $0.59 per diluted share, compared with a net loss of $2.2 million, or $0.05 per diluted share, in the prior-year quarter. The increase in net loss was driven primarily by $32.1 million of non-cash stock-based compensation associated with director, officer, and consultant equity awards primarily granted in connection with the Company’s February 2026 transition to a Nasdaq-listed public company.

“This quarter we fully funded the upgrade of the SRC Rare Earth Processing Facility and our planned Pilot and Commercial Metallization Facility, advanced our selection by the U.S. Army for exclusive Enhanced Use Lease negotiations at Tooele Army Depot, and continued to build the leadership team needed to execute our mine-to-magnet strategy. Committing the capital to fully fund the SRC upgrade and expansion, as well as our Metallization Facility, puts our flagship strategic projects on a clear path to commissioning, and reflects the same trend behind our discussions with the U.S. Army: North America’s need for secure, traceable, non-Chinese sources of rare earth and magnet materials has never been greater, and we intend to be that source.” — Leonard Sternheim, Chief Executive Officer of REalloys

“Rare earth magnets are foundational to the defense platforms, systems and advanced technologies that underpin the security of the United States and its allies, and we believe building a resilient, non-Chinese supply chain for these materials is one of the most consequential industrial challenges of our time. We have significantly deepened our leadership bench, adding public-company financial discipline, hands-on expertise in rare earth processing and metallization, and a sharpened focus on strategic partnerships. All this reflects the seriousness and technical depth we are bringing to this mission” — Stephen S. duMont, Non-Executive Chairman of the Board of REalloys

Second Quarter Financial Highlights

  • The Company’s cash balance as of June 30, 2026 was approximately $122.4 million

  • Maintained a strong, virtually debt-free balance sheet, against $209.8 million of assets

Revenue growth was driven by PMTCM’s sales of rare earth metals and materials from the Euclid facility, including under a Defense Logistics Agency contract, and by subscription revenue from the Blackbox trading analytics platform prior to its deconsolidation on May 5, 2026. General and administrative expense for the quarter included $32.1 million of non-cash stock-based compensation, comprising $19.5 million related to RSU and RPSU awards to the Board of Directors and executives and $12.6 million related to shares-for-services consulting awards. Excluding non-cash items, general and administrative expense was approximately $3.9 million (a non-GAAP measure; see “Non-GAAP Financial Measures” below).

For the six months ended June 30, 2026, net revenues were $1.5 million, compared with $0.4 million in the prior-year period, and net loss was $143.5 million, or $2.49 per diluted share, compared with a net loss of $3.9 million, or $0.11 per diluted share, in the prior-year period. The six-month net loss included $113.9 million of non-cash stock-based compensation, a $9.2 million non-cash accretion charge on the conversion of Series C Convertible Preferred Stock, a $6.4 million non-cash impairment charge related to the Company’s EVTEC investment, and a $3.4 million non-cash change in the fair value of contingent consideration.

Strategic Projects Update and Outlook

SRC Rare Earth Processing Facility Upgrade — Fully Funded. REalloys has fully funded, with committed capital, the planned upgrade of the SRC’s Rare Earth Processing Facility. SRC is expected to commence upgrade activity in the third quarter of 2026, targeting increased annual production capacity of approximately 525 tonnes of NdPr metal, 30 tonnes of dysprosium oxide and 15 tonnes of terbium oxide. REalloys has secured supply rights to approximately 80% of the expanded facility’s output. Together with SRC, the Company plans to advance separation trials using recycled mixed rare earth oxide feedstock in the second half of 2026, targeting separated material for potential customer qualification as early as the fourth quarter of 2026, with commercial intake of NdPr metal and dysprosium/terbium oxides from SRC expected to commence in the third quarter of 2027.

Heavy Rare Earth Metallization Facility — Fully Funded. The Company is advancing engineering and equipment procurement for its planned Heavy Rare Earth Metallization Facility, which is targeted for commissioning in the first quarter of 2028 and initial operations in the first half of 2028, with a targeted annual capacity of approximately 50 tonnes of combined dysprosium and terbium oxide feedstock.

Capital Resources and Liquidity. REalloys has committed approximately $58.3 million of capital funding for the SRC facility upgrade and its Heavy Rare Earth Metallization projects described above through to commissioning, and believes the Company’s existing cash resources are sufficient to fund these projects without reliance on any additional financing transaction.

U.S. Army Enhanced Use Lease Opportunity at Tooele Army Depot. The Company announced it had been selected by the U.S. Army for exclusive negotiations toward a long-term Enhanced Use Lease at Tooele Army Depot in Utah, under which REalloys would design, finance, build, and operate heavy rare earth processing facilities at the site. The negotiation phase is scheduled to complete by mid-September 2026.

Diversifying North American Feedstock Network. During the quarter, the Company entered non-binding arrangements to explore feedstock supply with U.S. Critical Materials Corp. (Sheep Creek project, Montana), Ramaco Resources, Inc. (Brook Mine, Wyoming) and Patriot Exploration & Mining, as it works to secure additional feedstock sources ahead of expanded processing capacity coming online.

Recent Developments

Leadership Appointments. Effective June 24, 2026, Craig Cunningham was appointed Chief Financial Officer, succeeding Robert Winspear. Mr. Cunningham is a Chartered Professional Accountant with more than two decades of global and cross-border public-company finance leadership in the mining and critical minerals sectors, including prior roles as CFO of Li-Cycle Holdings Corp. and Electra Battery Materials Corporation, and twelve years in senior finance roles at Kinross Gold Corporation.

Effective September 1, 2026, Anupam Ghildyal will transition from Chief Operating Officer to the newly created role of Chief Growth Officer. Mr. Ghildyal brings a track record in corporate development, capital formation, and commercialization, having been part of the founding team at VulcanForms and having helped launch more than 20 products while raising over $1 billion in funding for early-and growth-stage manufacturing, materials, and energy companies. In his new role, he will focus on advancing the Company’s strategic partnerships, feedstock and offtake relationships, and growth initiatives.

Dr. Muhammad Imran will join REalloys as Chief Operating Officer effective September 1, 2026. Dr. Imran holds a Ph.D. in Chemical Engineering and most recently served as Chief Technology Officer and Vice President at the Rare Earth Elements Division at SRC, the Company’s strategic processing and metallization partner. Having led SRC’s rare earth element capabilities since 2020, including directing the development of SRC’s Rare Earth Processing Facility in Saskatoon, his appointment gives REalloys direct operational continuity on its most significant near-term growth driver.

About REalloys Inc.

REalloys Inc. (NASDAQ: ALOY) is a U.S.-based rare earth materials company executing a mine-to-magnet strategy across upstream feedstock, midstream separation and metallization, and downstream magnet manufacturing. REalloys is focused on delivering qualified, allied-nation rare earth metals and alloys including dysprosium, terbium, and neodymium to the U.S. Department of Defense, the U.S. Department of Energy, NASA, the U.S. Defense Industrial Base, and the broader U.S. Organic Industrial Base.

For more information, please visit www.REalloys.com

 or email [email protected]

.

Cautionary Note Regarding Forward-Looking Statements

This press release contains forward-looking statements within the meaning of the federal securities laws. Forward-looking statements include, but are not limited to, statements regarding: the Company’s expectations regarding the SRC Rare Earth Processing Facility upgrade and commissioning timeline; the planned Heavy Rare Earth Metallization Facility and its targeted capacity, commissioning, and initial operations; anticipated commercial intake of rare earth materials from SRC; the U.S. Army Enhanced Use Lease negotiations at Tooele Army Depot; the sufficiency of the Company’s capital resources to fund its strategic projects; feedstock sourcing arrangements; the Company’s expectation regarding future capital needs; and the anticipated leadership transitions and their expected impact on the Company’s operations. These forward-looking statements are based on the Company’s current expectations and involve significant risks and uncertainties that could cause actual results to differ materially, including those described under “Risk Factors” in the Company’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2026, filed with the SEC. The Company undertakes no obligation to update these statements except as required by law.

Non-GAAP Financial Measures

This press release includes “Adjusted General and Administrative Expense,” which excludes non-cash stock-based compensation expense from GAAP general and administrative expense. The Company presents this measure because management believes it provides useful information about the Company’s cash-based operating cost structure, particularly given the significant non-cash stock-based compensation charges recognized in connection with the Company’s February 2026 reverse recapitalization and public listing. This non-GAAP measure should not be considered in isolation or as a substitute for the most directly comparable GAAP measure and should be read in conjunction with the Company’s condensed consolidated financial statements prepared in accordance with GAAP. The following reconciles GAAP general and administrative expense to Adjusted General and Administrative Expense for the three months ended June 30, 2026 (in thousands): General and administrative expense (GAAP): $36,031; Less: Non-cash stock-based compensation: ($32,131); Adjusted General and Administrative Expense (non-GAAP): $3,900.

Contacts

Investor and Media Relations – [email protected]

Financial Statements

Condensed Consolidated Statements of Operations (Unaudited)

(In thousands, except share and per share data)

| | | | | | | | | | | | | |

| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |

| | Three Months Ended Jun 30, 2026 | | | Three Months Ended Jun 30, 2025 | | | Six Months Ended Jun 30, 2026 | | | Six Months Ended Jun 30, 2025 | | |

| Net revenues | $ | 804 | | $ | 440 | | $ | 1,510 | | $ | 440 | |

| Cost of sales | | 329 | | | 219 | | | 628 | | | 219 | |

| Software development costs | | 34 | | | – | | | 68 | | | – | |

| General and administrative | | 36,031 | | | 1,056 | | | 121,432 | | | 1,924 | |

| Advertising and marketing | | 1,310 | | | – | | | 3,851 | | | – | |

| Depreciation and amortization | | (96 | ) | | 67 | | | (8 | ) | | 67 | |

| Total operating expenses | | 37,608 | | | 1,342 | | | 125,971 | | | 2,210 | |

| Loss from operations | | (36,804 | ) | | (902 | ) | | (124,461 | ) | | (1,770 | ) |

| Interest expense | | 14 | | | 94 | | | 22 | | | 185 | |

| Change in fair value of contingent consideration | | – | | | (2,096 | ) | | 3,439 | | | (1,312 | ) |

| Deferred cash consideration late payment penalties | | – | | | 3,300 | | | – | | | 3,300 | |

| Impairment expense | | – | | | – | | | 6,394 | | | – | |

| Accretion of discount on issuance of Series C Preferred Stock | | – | | | – | | | 9,220 | | | – | |

| Total other expense | | 14 | | | 1,298 | | | 19,075 | | | 2,173 | |

| Net loss | $ | (36,818 | ) | $ | (2,200 | ) | $ | (143,536 | ) | $ | (3,943 | ) |

| Basic and diluted net loss per share | $ | (0.59 | ) | $ | (0.05 | ) | $ | (2.49 | ) | $ | (0.11 | ) |

| Weighted-average shares outstanding, basic and diluted | | 62,142,617 | | | 41,290,000 | | | 57,704,321 | | | 36,965,956 | |

Condensed Consolidated Balance Sheets (Selected Data)

(In thousands)

| | | | | | | |

| --- | --- | --- | --- | --- | --- | --- |

| | June 30, 2026 (unaudited) | | | December 31, 2025 (audited) | | |

| Cash | $ | 122,357 | | $ | 2,824 | |

| Total current assets | | 154,095 | | | 38,541 | |

| Total assets | | 209,772 | | | 93,389 | |

| Total current liabilities | | 5,023 | | | 7,154 | |

| Total liabilities | | 19,168 | | | 56,049 | |

| Total stockholders’ equity | | 190,604 | | | 35,834 | |

| Working capital | | 149,072 | | | 31,387 | |

| Accumulated deficit | | (224,661 | ) | | (81,125 | ) |

Condensed Consolidated Statements of Cash Flows (Selected Data)

(In thousands, unaudited)

| | | | | | | |

| --- | --- | --- | --- | --- | --- | --- |

| | Six Months Ended Jun 30, 2026 | | | Six Months Ended Jun 30, 2025 | | |

| Net cash used in operating activities | $ | (17,720 | ) | $ | (702 | ) |

| Net cash used in investing activities | | (8,064 | ) | | (10 | ) |

| Net cash provided by financing activities | | 145,317 | | | 1,077 | |

| Net change in cash and cash equivalents | $ | 119,533 | | $ | 365 | |

Prompts

REalloys Inc. (ticker ALOY), listed in United States.

Company History

Date Change Detail
Feb 25, 2026 Renamed BLACKBOXSTOCKS INC. → REALLOYS INC.
Apr 14, 2016 Renamed SMSA BALLINGER ACQUISITION CORP → BLACKBOXSTOCKS INC.
— Former tickers BLBX

ETFs Holding REalloys Inc.

ETF Weight in ETF Shares Market value As of
VFMO 0.00% 24 $ 248.40 Aug 31, 2026