FINANCIAL HIGHLIGHTS Mongolian Mining Corporation (“MMC” or the “Company”) and its subsidiaries (the “Group”) generated revenue of United States Dollar (“USD”) 586.2 million during the first half of 2026, up 69% from USD346.6 million in the…
FINANCIAL HIGHLIGHTS
Mongolian Mining Corporation (“MMC” or the “Company”) and its subsidiaries (the “Group”)
generated revenue of United States Dollar (“USD”) 586.2 million during the first half of 2026,
up 69% from USD346.6 million in the corresponding period of 2025. The increase was driven
by higher washed coking coal sales volume and improved average selling price (“ASP”). In
addition, the Bayan Khundii ( “ BKH ” ) gold mine contributed USD94.7 million, accounting
for 16% of total revenue during the reporting period, being its first full reporting period of
commercial production.
The Group’s earnings before interest, taxes, depreciation and amortisation adjusted by other noncash and extraordinary items (“adjusted EBITDA”) was USD169.2 million during the first half
of 2026, compared to USD94.1 million in the corresponding period of 2025.
The Group recorded profit and profit attributable to equity shareholders of the Company of
USD105.9 million and USD89.0 million, respectively, for the six months ended 30 June 2026,
compared with a loss and loss attributable to equity shareholders of the Company of USD19.9
million and USD23.3 million, respectively, in the corresponding period of 2025.
Basic and diluted earnings per share for the six months ended 30 June 2026 were USD8.59 cents
and USD8.51 cents, respectively, compared with basic and diluted loss per share of USD2.24
cents in the corresponding period of 2025.
The board (the “Board”) of Directors (the “Directors”) of the Company does not recommend
the payment of dividend for the six months ended 30 June 2026 (dividend for the six months
ended 30 June 2025: nil).
During the six months ended 30 June 2026, the Company repurchased a total of 4,524,000 of
its own shares on the Stock Exchange of Hong Kong Limited (the “Stock Exchange”) at an
aggregate cost of Hong Kong Dollar (“HKD”) 41.3 million (equivalent to USD5.3 million).
Subsequent to the reporting period, the Company further repurchased 10,950,000 shares at an
aggregate cost of HKD73.5 million (equivalent to USD9.4 million). All of the repurchased
shares were cancelled.
Note: All numbers in this announcement are approximate rounded values for particular items.
1
The Board is announcing the unaudited consolidated interim results of the Group for the six
months ended 30 June 2026 together with the comparative figures for the corresponding period in
2025 as follows:
CONSOLIDATED STATEMENT OF PROFIT OR LOSS
For the six months ended 30 June 2026 – unaudited
Note
Six months ended 30 June
2026
2025
USD ’000
USD ’000
586,229
(451,320)
346,648
(283,789)
Gross profit
134,909
62,859
Other net income/(loss)
Selling and distribution costs
General and administrative expenses
46,376
(17,510)
(15,730)
(42)
(15,832)
(12,664)
Profit from operations
148,045
34,321
3(a)
4
Revenue
Cost of revenue
Finance income
Finance costs
5(a)
5(a)
4,192
(23,116)
2,854
(30,033)
Net finance costs
5(a)
(18,924)
(27,179)
–
1,017
–
(25,049)
310
(4)
130,138
(17,601)
(24,213)
(2,333)
Profit/(loss) for the period
105,925
(19,934)
Attributable to:
Equity shareholders of the Company
Non-controlling interests
88,980
16,945
(23,323)
3,389
Profit/(loss) for the period
105,925
(19,934)
Loss from repurchase of Senior Notes due 2026
Share of profit of associates
Share of loss of joint ventures
Profit/(loss) before taxation
6
Income tax
Basic earnings/(loss) per share
7(a)
8.59 cents
(2.24) cents
Diluted earnings/(loss) per share
7(b)
8.51 cents
(2.24) cents
2
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE
INCOME
For the six months ended 30 June 2026 – unaudited
Note
Profit/(loss) for the period
Six months ended 30 June
2026
2025
USD ’000
USD ’000
105,925
(19,934)
Item that will not be reclassified to profit or loss:
Surplus on revaluation of property,
plant and equipment of an associate
1,659
–
Item that may be reclassified subsequently to
profit or loss:
Exchange differences on translation
(5,647)
3,719
Total comprehensive income for the period
101,937
(16,215)
Attributable to:
Equity shareholders of the Company
Non-controlling interests
85,024
16,913
(19,664)
3,449
Total comprehensive income for the period
101,937
(16,215)
Other comprehensive income for the period
(after tax and reclassification adjustments)
3
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
At 30 June 2026 – unaudited
At 30 June
2026
USD ’000
At 31 December
2025
USD ’000
1,293,251
10,807
46
529,142
18,440
13,555
25,041
1,281,241
13,860
47
533,627
15,847
5,527
21,384
1,890,282
1,871,533
167,714
101,297
294,409
156,430
95,115
223,948
563,420
475,493
182,889
185,980
–
129
9,928
179,701
167,359
50,000
69
10,969
Total current liabilities
378,926
408,098
Net current assets
184,494
67,395
2,074,776
1,938,928
Note
Non-current assets
Property, plant and equipment, net
Construction in progress
Other right-of-use assets
Intangible assets
Interest in associates
Other non-current assets
Deferred tax assets
8
9
10
Total non-current assets
Current assets
Inventories
Trade and other receivables
Cash and cash equivalents
11
Total current assets
Current liabilities
Trade and other payables
Contract liabilities
Borrowing
Lease liabilities
Current taxation
12
13
Total assets less current liabilities
4
CONSOLIDATED STATEMENT OF FINANCIAL POSITION (CONTINUED)
At 30 June 2026 – unaudited
At 30 June
2026
USD ’000
At 31 December
2025
USD ’000
50,000
344,600
38,536
–
152,008
–
344,012
37,844
6,000
154,248
585,144
542,104
1,489,632
1,396,824
Share capital
Reserves
103,433
1,211,617
103,685
1,131,035
Total equity attributable to equity shareholders
of the Company
1,315,050
1,234,720
174,582
162,104
1,489,632
1,396,824
Note
Non-current liabilities
Borrowing
Senior notes
Provisions
Other non-current liabilities
Deferred tax liabilities
13
14
Total non-current liabilities
NET ASSETS
CAPITAL AND RESERVES
Non-controlling interests
TOTAL EQUITY
5
NOTES
1
BASIS OF PREPARATION
This interim financial report has been prepared in accordance with the applicable disclosure provisions of the
Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited, including compliance
with IAS 34, Interim financial reporting , issued by the International Accounting Standards Board (“IASB”). It
was authorised for issue on 20 August 2026.
The interim financial report has been prepared in accordance with the same accounting policies adopted in the
2025 annual financial statements, except for the accounting policy changes that are expected to be reflected in
the 2026 annual financial statements. Details of any changes in accounting policies are set out in Note 2.
The preparation of an interim financial report in conformity with IAS 34 requires management to make
judgements, estimates and assumptions that affect the application of policies and reported amounts of assets and
liabilities, income and expenses on a year-to-date basis. Actual results may differ from these estimates.
The interim financial report contains condensed consolidated financial statements and selected explanatory
notes. The notes include an explanation of events and transactions that are significant to an understanding of
the changes in financial position and performance of Mongolian Mining Corporation (the “Company”) together
with its subsidiaries (the “Group”) since the 2025 annual financial statements. The condensed consolidated
interim financial statements and the accompanying notes do not include all of the information required for a full
set of financial statements prepared in accordance with IFRS Accounting Standards.
The interim financial report is unaudited, but has been reviewed by KPMG in accordance with Hong Kong
Standard on Review Engagements 2410, Review of interim financial information performed by the independent
auditor of the entity , issued by the Hong Kong Institute of Certified Public Accountants.
2
CHANGES IN ACCOUNTING POLICIES
The IASB has issued a number of amendments to IFRS Accounting Standards that are first effective for the
current accounting period. None of these developments have had a material effect on these financial statements.
The Group has not applied any new standard or interpretation that is not yet effective for the current accounting
period.
6
3
REVENUE AND SEGMENT REPORTING
(a)
Revenue
The Group is principally engaged in the mining, processing, transportation and sale of coal products and
gold and metal products. Revenue represents the sales value of goods sold to customers exclusive of
value added or sales taxes and after deduction of any trade discounts and volume rebates. The amount of
each significant category of revenue recognised for the six months ended 30 June 2026 and 2025 are as
follows:
Six months ended 30 June
2026
2025
USD ’000
USD ’000
Revenue from contracts with customers within the
scope of IFRS 15
Coal mining segment
Washed hard-coking coal (“HCC”)
Washed mid-ash semi-hard coking coal (“MASHCC”)
Washed semi-soft coking coal (“SSCC”)
Middlings
Raw thermal coal
335,097
129,199
18,951
2,829
5,476
236,511
50,348
26,685
32,559
545
Gold and metals mining segment
Gold products
Silver products
94,187
490
–
–
586,229
346,648
Revenue generated from the coal mining segment and gold and metals mining segment is from sale of
goods, which is recognised when the goods are transferred at point in time.
(b)
Segment reporting
The Group manages its businesses by business lines, which are divided into coal products and gold and
metal products. In a manner consistent with the way in which information is reported internally to the
Group’s most senior executive management for the purposes of resources allocation and performance
assessment, the Group has identified and presented the following two reportable segments. No operating
segments have been aggregated to form the following reportable segments:
•
Coal mining segment: the mining, processing, transportation and sale of coal products;
•
Gold and metals mining segment (Note): the mining, processing, transportation and sale of gold
and metal products.
Note:
The copper mine is at early exploration and evaluation stage.
7
4
COST OF REVENUE
Six months ended 30 June
2026
2025
USD ’000
USD ’000
Mining costs
Processing costs
Transportation costs
Others (Note)
207,354
65,125
86,101
92,740
129,311
35,300
63,891
55,287
Cost of revenue
451,320
283,789
Note:
Others mainly include royalty tax on the coal and gold sold, and site administration costs.
5
PROFIT BEFORE TAXATION
Profit before taxation is arrived at after (crediting)/charging:
(a)
Net finance costs:
Six months ended 30 June
2026
2025
USD ’000
USD ’000
(b)
Interest income
Foreign exchange gain, net
(3,314)
(878)
(2,854)
–
Finance income
(4,192)
(2,854)
Interest on liability component of senior notes (Note 14)
16,006
16,723
Interest on borrowing (Note 13)
Less: interest expense capitalised into
construction in progress
3,158
1,762
–
978
Net interest on borrowing
3,158
784
Interest on lease liabilities
Unwinding interest on accrued reclamation obligations
Foreign exchange loss, net
Others
9
2,258
–
1,685
23
2,789
8,758
956
Finance costs
23,116
30,033
Net finance costs
18,924
27,179
Other items:
Six months ended 30 June
2026
2025
USD ’000
USD’000
Depreciation and amortisation
Loss on disposal of property, plant and equipment
8
70,486
192
58,336
808
6
INCOME TAX
(a)
Income tax in the consolidated statement of profit or loss represents:
Six months ended 30 June
2026
2025
USD ’000
USD ’000
Current tax
Deferred tax
(b)
30,198
(5,985)
8,906
(6,573)
24,213
2,333
Reconciliation between tax expenses and accounting profit/(loss) at applicable tax rates:
Six months ended 30 June
2026
2025
USD ’000
USD ’000
Profit/(loss) before taxation
130,138
(17,601)
Notional tax on profit before taxation
Tax effect of non-deductible items (Note (iii))
Prior year tax losses utilised
Tax effect of non-taxable items (Note (iii))
Tax losses not recognised
26,481
2,779
–
(5,227)
180
297
3,632
(16)
(2,278)
698
Actual tax expenses
24,213
2,333
Notes:
7
(i)
Pursuant to the income tax rules and regulations of Mongolia, the subsidiaries of the Group located
in Mongolia are liable to Mongolian Corporate Income Tax at a rate of 10% for the first MNT6
billion taxable income, and 25% for the remaining taxable income for the six months ended 30
June 2026 and 2025. According to the Corporate Income Tax Law of China, the Company’s
subsidiaries in China are subject to statutory income tax rate of 25%.
(ii)
Pursuant to the rules and regulations of the Cayman Islands, the Group is not subject to any income
tax in the Cayman Islands. The Group is not subject to Hong Kong, Luxembourg and Singapore
profits tax as it has no assessable income arising in or derived from Hong Kong, Luxembourg and
Singapore during the six months ended 30 June 2026 and 2025.
(iii)
Non-deductible and non-taxable items mainly include net unrealised exchange gain or loss, other
non-deductible expenses and non-taxable income pursuant to the income tax rules and regulations
of Mongolia and other related tax source regions during the six months ended 30 June 2026 and
2025.
EARNINGS/(LOSS) PER SHARE
(a)
Basic earnings/(loss) per share
The calculation of basic earnings per share is based on the profit attributable to ordinary equity
shareholders of the Company of USD88,980,000 (loss attributable to ordinary equity shareholders of
the Company for the six months ended 30 June 2025: USD23,323,000) and the weighted average of
1,035,377,328 ordinary shares (six months ended 30 June 2025: weighted average of 1,041,472,786
ordinary shares) in issue during the interim period.
9
(b)
Diluted earnings/(loss) per share
For the six months ended 30 June 2026, the effect of the outstanding share options was dilutive and
therefore included in the calculation of diluted earnings per share. The calculation of diluted earnings per
share is based on the profit attributable to ordinary equity shareholders of the Company and the weighted
average of 1,045,811,902 ordinary shares after adjusting the effects of the outstanding share options.
Weighted average number of ordinary shares (diluted) is calculated as follows:
Six months ended 30 June
2026
2025
USD ’000
USD ’000
Weighted average number of ordinary shares at 30 June
Dilution effect of the Company’s share
option scheme (Note 15(b))
Weighted average number of ordinary shares
(diluted) at 30 June
1,035,377,328
1,041,472,786
10,434,574
–
1,045,811,902
1,041,472,786
For the six months ended 30 June 2025, basic and diluted loss per share were the same. The outstanding
share options were anti-dilutive and therefore not included in calculating diluted loss per share for the six
months ended 30 June 2025.
8
PROPERTY, PLANT AND EQUIPMENT, NET
(a)
Right-of-use assets
During the six months ended 30 June 2026, the Group entered into lease agreements for office premises
and recognised additions to the right-of-use assets amounting to USD377,000 (six months ended 30 June
2025: USD89,000).
(b)
Acquisitions and disposals of owned assets
Mining properties of the Group as at 30 June 2026 include stripping activity assets with carrying amount
of USD648,184,000 (as at 31 December 2025: USD604,847,000).
During the six months ended 30 June 2026, the additions of property, plant and equipment of the Group,
representing mainly mining properties and machinery and equipment, amounted to USD81,869,000 (six
months ended 30 June 2025: USD87,509,000). Items of property, plant and equipment with a net book
value of USD195,000 were disposed of during the six months ended 30 June 2026 (six months ended 30
June 2025: USD808,000).
9
CONSTRUCTION IN PROGRESS
The construction in progress is mainly related to buildings and plants.
10
INTANGIBLE ASSETS
Intangible assets mainly represent the mining rights.
10
11
TRADE AND OTHER RECEIVABLES
As of the end of the reporting period, the ageing analysis of trade debtors (which are included in trade and other
receivables), based on the invoice date and net of allowance for doubtful debts, is as follows:
At 30 June
2026
USD ’000
At 31 December
2025
USD ’000
Within 90 days
91 to 180 days
181 to 270 days
271 to 365 days
Over 365 days
28,670
5,524
792
–
297
32,478
1,878
–
1,299
577
Trade receivables net of allowance for credit losses
35,283
36,232
Other debtors
1,180
1,976
Financial assets measured at amortised cost
36,463
38,208
Prepayments and deposits
Value added tax (“VAT”) and other tax receivables (Note)
16,047
48,787
11,902
45,005
101,297
95,115
Note:
VAT and other tax receivables include amounts that have been accumulated to date in certain subsidiaries
and were due from Mongolian Tax Authority (“MTA”). According to the prevailing tax rules and regulations
in Mongolia, a taxpayer may offset future taxes and royalties payable to MTA against VAT receivable from
MTA. The Group verifies the collectability of such funds with MTA on a regular basis, and based on currently
available information, the Group anticipates full recoverability.
12
TRADE AND OTHER PAYABLES
As of the end of the reporting period, the ageing analysis of trade creditors (which are included in trade and
other payables), based on the invoice date, is as follows:
At 30 June
2026
USD ’000
At 31 December
2025
USD ’000
Within 90 days
91 to 180 days
181 to 365 days
Over 365 days
117,476
–
10
37
102,040
13
5
133
Total trade creditors
117,523
102,191
Payables for purchase of equipment
Interest payables
Other taxes payables
Amounts due to related parties
Payables for acquisition of a subsidiary
Others
2,788
7,651
11,039
15,614
5,784
22,490
3,663
7,731
32,483
10,317
6,000
17,316
182,889
179,701
11
13
BORROWING
At 30 June 2026
Effective
interest rate
USD ’000
–
11.80%
Current portion of borrowing
Long-term borrowing
At 31 December 2025
Effective
interest rate
USD ’000
–
50,000
13.30%
–
50,000
–
On 4 December 2024, Erdene Mongol LLC (“EM”) entered into a USD50,000,000 loan agreement with a local
bank in Mongolia, bearing interest at a fixed rate of 13.3% per annum and secured by EM’s processing plant.
Pursuant to an amendment to the loan agreement dated 23 April 2026, the interest rate was reduced to 11.8%
per annum and the maturity date was extended to 17 December 2027.
14
SENIOR NOTES
Senior Notes due 2030
At 30 June
2026
USD ’000
At 31 December
2025
USD ’000
344,600
344,012
On 3 April 2025, the Group issued senior notes due 2030 (“Senior Notes due 2030”) with a principal amount of
USD350,000,000. The Senior Notes due 2030 is listed on the SGX-ST, bears interest at 8.44% per annum fixed
rate, payable semi-annually, and is due on 3 April 2030.
The Senior Notes due 2030 is accounted for as a hybrid financial instrument containing a derivative component
and a liability component. The derivative component of early redemption option was initially recognised at its
fair value of nil. The fair value of the derivative component of early redemption option as at 30 June 2026 was
nil. The liability component was initially recognised at its fair value, taking into account attributable issuance
discount, and will be accounted on amortised cost subsequently.
Fair value of the derivative component was estimated based on the Binomial model.
15
CAPITAL, RESERVES AND DIVIDENDS
(a)
Dividends
The board of directors of the Company does not recommend declaration and payment of interim dividend
in respect of the six months ended 30 June 2026 (six months ended 30 June 2025: nil).
(b)
Equity settled share-based transactions
On 3 April 2023, 33,250,000 share options were granted to a director and employees of the Company
under the share option scheme. Each option gives the holder the right to subscribe for one ordinary share
of the Company. These share options will vest on 3 April 2024, 3 April 2025, 3 April 2026 and 3 April
2027 separately of 25% each, and then be exercisable until 3 April 2028. The exercise price is HKD3.26,
being the closing price as stated in the daily quotations sheet issued by The Stock Exchange of Hong
Kong Limited (the “Stock Exchange”) on the date of grant.
On 23 June 2026, 41,875,000 share options were granted to a director and employees of the Company
under the share option scheme. Each option gives the holder the right to subscribe for one ordinary share
of the Company. These share options will vest 25% each time on 24 June 2028 and 24 June 2029, and
50% on 24 June 2030, and then be exercisable until 16 June 2031. The exercise price is HKD7.134, being
the closing price as stated in the daily quotations sheet issued by the Stock Exchange on the date of grant.
612,500 share options were exercised during the six months ended 30 June 2026 (six months ended 30
June 2025: 2,351,000).
12
MANAGEMENT DISCUSSION AND ANALYSIS
COKING (METALLURGICAL) COAL
Industry Overview
In the first half of 2026, China produced 500.0 million tonnes (“Mt”) of crude steel, compared
to 515.5 Mt reported in the corresponding period of 2025, representing a 3.0% year-on-year
(“YoY”) decrease. Despite the decline, China accounted for 53.7% of total global steel production,
according to the World Steel Association. China’s domestic crude steel consumption and steel
exports declined by 2.8% and 5.5% YoY, respectively.
According to Fenwei Digital Information Technology Co., Ltd. ( “ Fenwei ” ), China ’ s coke
production and coke consumption in the first half of 2026 were 252.5 Mt and 248.3 Mt,
respectively, representing a 1.2% and 4.8% YoY increase, respectively. China ’s coke exports
increased by 14.3% YoY to 4.0 Mt in the reporting period. According to Fenwei, China ’ s
coking coal consumption increased to 301.6 Mt in the first half of 2026 from 296.3 Mt in the
corresponding period of 2025, while domestic coking coal production decreased to 228.7 Mt from
237.9 Mt.
The General Administration of Customs of China reported that China ’ s coking coal imports
reached 66.9 Mt in the first half of 2026, remaining at elevated levels, representing a 26.7%
increase from the corresponding period of 2025. Imports from Mongolia increased by 63.7% YoY,
reaching a record high level of 40.6 Mt from 24.8 Mt in the corresponding period of 2025, whereby
Mongolia strengthened its position as the leading source for imported coking coal by accounting
for 60.7% of the total coking coal imports to China, as tabulated below.
Table 1. China’s coking coal imports by country (Mt) (Notes):
Country
1H2026
Market
Share
Mongolia
Russia
Australia
Canada
USA
Others
40.6
17.3
4.6
3.0
–
1.4
60.7%
25.9%
6.9%
4.5%
0%
2.1%
24.8
14.8
3.8
5.4
2.9
1.1
+63.7%
+16.9%
+21.1%
-44.4%
-100.0%
+27.3%
Total
66.9
100.0%
52.8
+26.7%
Source: Fenwei.
Notes:
(i)
Imports from Mongolia include raw unprocessed, dry and wet coking coal.
(ii)
Rounding may cause minor discrepancies in totals and percentages.
13
1H2025
Change
Legal Framework Developments
Progress Update on Strategic Deposits
As reported in the Company’s previous periodic reports, the Law on the National Wealth Fund
and amendments to related Mongolian laws, including the Minerals Law, came into effect on 11
May 2024, pursuant to which the state may hold up to 50% of the shares free of charge in a legal
entity holding a license covering Mineral Deposits of Strategic Importance (“Strategic Deposits”)
reserves defined through state-funded exploration, or up to 34% of the shares free of charge
where the Strategic Deposits reserves is defined through privately funded exploration, with such
shareholding alternatively replaceable by a special royalty, as to be defined by the Parliament.
On 10 February 2026, the former Prime Minister of Mongolia signed a non-legally binding
Memorandum of Understanding (“MoU”) with certain private entities holding mining licenses
covering Strategic Deposits, including Energy Resources LLC (“ER”) and Khangad Exploration
LLC (“KEX”).
On 6 May 2026, the Prime Minister of Mongolia, Mr. Uchral Nyam-Osor, announced that the
Government of Mongolia (“GoM”) will prepare a separate law establishing a uniform methodology
for determining state participation in Strategic Deposits and the distribution of corresponding
economic benefits to the National Wealth Fund, in place of separate negotiations with individual
license holders. The Company will make further announcement(s) regarding the progress of the
draft law as and when appropriate.
Mining Industry
As of the date of this announcement, the draft amendments to the Minerals Law (2006) are at the
final reading with approval expected following the autumn session. Key revisions relevant to the
Group include limiting the 2.5% base royalty rate to domestic sales of coal for power generation
and heating purposes, a more comprehensive mine closure regime with financial assurance
requirements, and an increase in the annual mining license fee for coal deposits from MNT7,250
to MNT12,000 per hectare. As the majority of the Group’s coal sales are for exports, the Group
does not expect the proposed amendments to have any material adverse impact on its operations or
financial position and will ensure compliance following their entry into force.
Business Environment
On 3 July 2026, the Parliament of Mongolia ( “ Parliament ” ) adopted the Law on Economic
Freedom, strengthening the protection of property rights and the freedom to conduct business,
including prohibitions on state authorities granting preferential treatment to certain business
operators and unlawfully confiscating or expropriating private property. As an accompanying law,
the Investment Law (2013) was amended to introduce a dispute resolution framework under which
investors may submit complaints regarding unlawful acts or omissions of state authorities, with
unresolved complaints eligible for escalation to a cabinet meeting of the GoM. In addition, on 5
June 2026, the Parliament repealed the law that had vested the GoM with the authority to place
enterprises under its direct control for up to six months, which came into effect on 1 July 2026.
The Group considers that these developments will strengthen investment protection and reduce
state intervention in business activities in Mongolia.
14
Environment
On 22 May 2026, the Parliament adopted amendments to the Law on Environmental Impact
Assessment (2012), which came into effect on 1 August 2026, that streamline the approval process
by narrowing the mandatory consultation requirement to residents directly affected by a project
and permitting environmental management plans to be approved for periods of up to ten years
rather than annually, while expanding the scope of environmental impact assessments to include
social and public health impacts. The Group expects these amendments to reduce approval delays
and will ensure compliance with the revised requirements.
Taxation
On 26 June 2026, the Parliament adopted amendments to key tax laws, which will come into
effect on 1 January 2027. Under the amended Corporate Income Tax Law, the two-tier progressive
regime will be replaced with a three-tier regime, under which annual taxable income of up to
MNT6 billion will remain subject to a 10% rate, the portion of taxable income exceeding MNT6
billion but not exceeding MNT10 billion will be subject to a new 15% rate, and the portion
exceeding MNT10 billion will remain subject to a 25% rate.
Coal Mining Assets
The Group is the largest producer and exporter of washed coking coal products in Mongolia. ER,
its wholly-owned subsidiary, operates the Ukhaa Khudag (“UHG”) coking coal mine, and KEX, its
majority-owned subsidiary, operates the Baruun Naran (“BN”) coking coal mine, both located in
Umnugobi aimag (province), Mongolia.
The UHG deposit sits within the 2,960 hectares covered by Mining License MV-011952 (“UHG
mining license”), granted to the Group effective for 30 years from 29 August 2006. The BN
deposit is covered by two mining licenses, mining License MV-014493 (“BN mining license”) of
4,482 hectares area was obtained on 1 June 2011, and is effective for 30 years from 1 December
2008, while Mining License MV-017336 (“THG mining license”) of 8,340 hectares area was
granted to the Group on 24 June 2013, effective for 30 years. All three licenses are extendable
twice by 20-year periods.
Coal Resources and Reserves
Coal Resource estimates were prepared in accordance with the requirement of the JORC Code
(2012) and updated as at 31 December 2025.
Table 2. The Group’s Coal Resources as at 31 December 2025 (Notes):
Resource Category
Deposit
Measured Indicated
(Mt)
(Mt)
Inferred
(Mt)
Total
M+I
(Mt)
Total
M+I+I
(Mt)
UHG
BN
THG
430
320
–
30
50
70
60
30
20
460
370
70
520
400
90
Pro-Forma Total
750
150
110
900
1,010
15
Notes:
(i)
Technical information in the UHG, BN and THG Coal Resource estimation reports has been compiled by Mr.
Byambaa Barkhas, an employee of the Group. Mr. Barkhas is a member of the Australasian Institute of Mining
and Metallurgy (the “AusIMM ”) (Member #318198) and has over 16 years of experience relevant to the style
and type of coal deposit under consideration and to the activity which is being undertaken to qualify as a
Competent Person as defined by the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves, The JORC Code (2012). Mr. Barkhas consents to the inclusion and the release of the matters
based on this information in the form and context in which it appears in this announcement. The estimates of
the Coal Resource set out in Table 2 presented in this announcement are considered to be a true reflection of the
UHG, BN and THG Coal Resources as at 31 December 2025 and have been carried out in accordance with the
principles and guidelines of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves, The JORC Code (2012).
(ii)
Internal peer audit of these latest structural and coal quality models was conducted by Mr. Lkhagva-Ochir Said.
This peer audit confirmed the Group ’s work to update the UHG, BN and THG geological model, and thus the
Coal Resource estimate for the UHG, BN and THG mining license areas, was in compliance with requirements
of the JORC Code (2012). Mr. Said is employed by the Group as Chief Technical Officer. Mr. Said is a member
of the AusIMM (Member #316005) and has over 18 years of experience relevant to the style and type of coal
deposit under consideration and to the activity which is being undertaken to qualify as a Competent Person as
defined by the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves,
The JORC Code (2012).
(iii)
Due to rounding, discrepancy may exist between sub-totals and totals. Rounding rules refer to Clause 25 of the
JORC Code (2012).
Coal Reserve estimates were prepared in accordance with the requirement of the JORC Code (2012)
and updated as at 1 January 2026.
Table 3. The Group’s run-of-mine (“ROM”) Coal Reserves estimate as at 1 January 2026 (Notes):
Reserve Category
Proved (Mt) Probable (Mt)
Deposit
Coal Type
UHG
Coking
Thermal
Total
301
17
318
10
–
10
311
17
328
BN
Coking
Thermal
Total
235
8
243
23
1
24
258
9
267
561
34
595
Pro-Forma Total
16
Total (Mt)
Notes:
(i)
The estimate of Coal Reserve presented in Table 3 has been carried out in accordance with the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, The JORC Code (2012).
Technical information in the UHG and BN Coal Reserve estimation reports has been compiled by Mr.
Naranbaatar Lundeg, who is a member of the AusIMM (Member #326646). He is the Executive Consultant of
Glogex Consulting LLC. He holds a bachelor ’s degree of mining industrial management and a master ’s degree
of business administration in the field of financial management. He has extensive experience in the mining
industry, having worked with major mining companies and as a consultant for over 24 years. During this time,
he has either managed or contributed significantly to numerous mining studies related to the estimation, pit
optimisation, mine planning, assessment, evaluation and economic extraction of coal in Mongolia. He has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and
to the activity he is undertaking to qualify him as a Competent Person as defined under the JORC Code (2012).
Mr. Lundeg consents to the inclusion and the release of the matters based on this information in the form and
context in which it appears in this announcement.
(ii)
Due to rounding, discrepancy may exist between sub-totals and totals.
Production and Sales
The Group mined a total of 9.3 Mt of ROM coal during the first half of 2026, comprising 7.1 Mt
from the UHG mine and 2.2 Mt from the BN mine. ROM coal from both mines is processed at
the Group’s coal handling and preparation plant (“CHPP”). During the six months ended 30 June
2026, the Group processed 8.4 Mt of ROM coal, resulting in total washed coal output of 5.1 Mt.
Coal products were transported to the Ganqimaodu (“GM”) border crossing using a combination of
the Group’s own trucking fleet and third-party contractors. During the first half of 2026, the Group
started utilising rail transportation from the UHG rail terminal to the Gashuunsukhait transshipment
terminal, with approximately 189.9 thousand tonnes (“Kt”) of coal products transported by rail
during the reporting period.
The Group’s coal sales volume increased to 5.7 Mt during the reporting period from 4.2 Mt in the
corresponding period of 2025. The total washed coking coal product mix comprised 2.6 Mt HCC,
0.2 Mt SSCC and 2.4 Mt MASHCC (1H2025: 2.0 Mt, 0.3 Mt, and 1.0 Mt, respectively).
Coal products are sold by the Group under various delivery terms, including ex-works UHG
terms and Free-Carrier Tsagaan Khad terms for local sales, and Delivery-at-Place GM and
Free-on-Transport GM (“FOT GM”) terms for export sales. The Group sells its coal products
through direct sales to long-term customers and online auctions via the Mongolian Stock Exchange
(“MSE”) commodity exchange platform, with online auction sales accounting for 38% of the
Group’s total sales volume during the first half of 2026 (1H2025: 24%).
The ASP for all washed coal products sold under various delivery terms was USD90.9 per tonne
during first half of 2026, compared with USD82.2 per tonne in the corresponding period of
2025. The ASP for mid-volatile HCC, high-volatile HCC, SSCC, MASHCC, and middlings was
USD132.3, USD118.6, USD100.8, USD53.5 and USD27.8 per tonne, respectively, during the
reporting period.
17
Cost of Revenue
The cost of revenue from the Group ’ s coking (metallurgical) coal operations amounted to
USD405.4 million during the first half of 2026, of which USD307.6 million was attributable to the
UHG mine and USD97.8 million was attributable to the BN mine.
Mining costs are related to overburden and topsoil removal, as well as ROM coal extraction,
including staff costs, maintenance costs, fuel costs, fees paid to blasting and mining contractors,
and depreciation and amortisation. Unit mining cost increased to USD20.7 per ROM tonne during
the first half of 2026 from USD19.4 per ROM tonne in the corresponding period of 2025, primarily
due to higher fuel costs.
Processing costs are associated with CHPP operations, including staff costs, maintenance costs,
power generation costs, water extraction costs, consumables, and depreciation and amortisation.
Unit processing cost was USD4.9 per ROM tonne in the first half of 2026 (1H2025: USD5.3 per
ROM tonne).
Unit transportation cost was USD16.1 per tonne during the first half of 2026, compared with
USD15.2 per tonne in the corresponding period of 2025.
The Group’s effective royalty rate for coal products was 5.6% during the first half of 2026.
Royalties on exported processed coal products are charged by the GoM in the range of 5% to 8%,
based on monthly benchmark prices published by the relevant authorities. For coal products sold
through the MSE commodity exchange platform, royalties are calculated based on the monthly
average trading price published by the MSE.
Table 4. Cost of revenue:
Six months ended 30 June
2026
2025
(USD ’000)
(USD ’000)
Cost of revenue
Mining cost
Variable cost
Fixed cost
Depreciation and amortisation
Processing cost
Variable cost
Fixed cost
Depreciation and amortisation
Handling cost
Transportation cost
Logistic cost
Variable cost
Fixed cost
Depreciation and amortisation
Site administration cost
Transportation and stockpile loss
Royalties and fees
Royalty
Air pollution fee
Customs fee
405,405
195,480
125,073
26,000
44,407
44,655
15,871
15,862
12,922
10,614
86,101
8,071
3,163
4,579
329
20,479
6,753
33,252
27,727
3,378
2,147
18
283,789
129,311
76,088
18,755
34,468
35,300
16,117
8,241
10,942
7,808
63,891
7,288
2,493
4,480
315
14,747
1,601
23,843
20,896
1,313
1,634
GOLD AND METALS
Industry Overview
According to the World Gold Council, gold demand in the first half of 2026 reached 2,522 tonnes,
up 2% YoY, with a record value of USD380 billion, while reported mine production for the period
was 1,867 tonnes. Gold extended its rally into early 2026, setting successive all-time highs and
peaking at approximately USD5,400 per ounce (“oz”) in late January. Sentiment shifted in the
second quarter as renewed inflationary pressures in major economies led market participants to
reassess the trajectory of monetary policy and price in a rising probability of policy rate hikes.
The average London Bullion Market Association ( “LBMA”) gold price for the first half of 2026, at
approximately USD4,680 per oz, was over 50% higher than the average price in the corresponding
period of 2025. As at the end of the reporting period, the LBMA London Fix Price for gold stood
at USD4,016 per oz, approximately 9% lower than at the beginning of the year.
The Bank of Mongolia ( “ BoM ” ) and its designated commercial banks purchase gold from
producers in Mongolia at prices determined by the LBMA London Fix Price, denominated in
Mongolian Togrog (“MNT”), which is subject to the lowest applicable 5.0% royalty charged by
the GoM according to the relevant provisions under the Minerals Law of Mongolia.
Silver was exceptionally volatile during the reporting period. The metal price reached an all-time
high of above USD121 per oz on 29 January 2026, before falling sharply as inflation concerns
and expectations of policy rate hikes pushed real yields higher, disproportionately affecting silver,
given its greater sensitivity to investment flows. During the reporting period, the average LBMA
London Fix Price for silver stood at USD76 per oz, approximately 123% higher compared to
the corresponding period in 2025. According to the Silver Institute’s World Silver Survey 2026,
despite rising supply and an overall contraction in demand, silver is set for a sixth year of deficit,
with the deficit widening to 46.3 million ounces.
Gold and Metals Mining Assets
The Group is a 50% equity holder in EM, which owns and operates the BKH gold mine. EM holds
Mining License MV-021444 ( “ Khundii mining license ” ), Mining License MV-021547 ( “ AN
mining license”) and Exploration License XV-016057 (“Ulaan exploration license”) through
its subsidiary. The Khundii and AN mining licenses cover areas of 2,309 hectares and 4,669
hectares, respectively, and are effective for 30 years from 5 August 2019 and 5 March 2020,
respectively. The Ulaan exploration license covers an area of 1,780 hectares, west of the Khundii
mining license, and is effective for three years from 16 February 2015, extendable three times by
three-year periods. The Group has initiated the process to convert the Ulaan exploration license to
mining license according to requirements set by relevant laws and regulations.
19
The Group holds 50.5% equity interest in Universal Copper LLC (“UCC”), which develops the
White Hill (“ WTH ” ) copper deposit and Urkhut (“ URT ” ) silver deposit. UCC holds Mining
License MV-017089 ( “ WTH mining license ” ), Mining License MV-017579 ( “ URT mining
license”) and Mining License MV-021014 (“KHT mining license”). The WTH, URT and KHT
mining licenses cover areas of 2,931 hectares, 5,301 hectares and 6,557 hectares, respectively, and
are effective for 30 years from 30 July 2012, 17 July 2014 and 30 January 2018, respectively.
All mining licenses are extendable twice by 20-year periods according to relevant provisions
stipulated under the Minerals Law. The above-mentioned licenses are located in Bayankhongor
aimag (province), Mongolia.
Gold and Metals Resources and Reserves
Resource estimates for gold and silver contained within the Khundii mining license area were
prepared for BKH, Dark Horse (“DKH”) deposits and AN mining license area in accordance with
the JORC Code (2012) standards.
During the first half of 2026, the Group completed an update of the Mineral Resource and Reserve
estimates for the deposits within the Khundii mining license area. The updated estimates were
prepared by incorporating information obtained from additional exploration and initial mining
work of the BKH deposit and reflecting changes in gold metal prices.
The updated resource model has been cut to the surveyed topography of the BKH open-pit as at 30
June 2026 to capture depletion. Overall, the depleted mineral resource estimate for BKH increased
as a result of the incorporation of more lower grade material, while retaining its high-grade zones
that include 400 Koz gold contained in Measured and Indicated averaging 3.31 g/t at a cut-off
grade of 0.6 g/t.
BKH gold deposit Mineral Resource estimates were prepared under the JORC Code (2012) and
updated as at 30 June 2026.
Table 5. BKH gold deposit Mineral Resource estimates as at 30 June 2026 (Notes):
Quantity
(Mt)
Gold
Grade
(Au g/t)
Measured
Indicated
M&I
Inferred
3.0
4.8
7.8
0.4
Total
8.2
Resource
Classification
20
Gold
(Koz)
Silver
Grade
(Ag g/t)
Silver
(Koz)
2.13
1.66
1.84
0.91
204
257
461
12
1.12
1.17
1.15
0.99
108
182
290
12
1.79
473
1.15
302
Notes:
(i)
The Statement of Estimates of Mineral Resources has been compiled by Mr. Oyunbat Bat-Ochir who is a
full-time employee of SLR Consulting LLC and a Member of the Australian Institute of Geoscientists. Mr.
Bat-Ochir has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity that he has undertaken to qualify as a Competent Person as defined in the
JORC Code.
(ii)
Mineral Resources are estimated using a gold price of USD3,900 per oz and a silver price of USD40 per oz.
(iii)
Mineral Resource is depleted for the topographic surface dated 30 June 2026.
(iv)
Mineral Resources are reported at a cut-off grade of 0.27 g/t Au and constrained by a preliminary optimised pit
shell with a pit slope angle of 45 0.
(v)
Cut-off grade was generated by assuming an open cut mining method with 2.5% ore loss and 10% dilution, a
gold price of US$3,900 per ounce, an open mining cost of US$2.76 per tonne and a processing cost of US$25.56
per tonne milled, a general and administration cost of US$1.5 per tonne and a processing recovery of 93% for
all mineralisation. The conceptual optimised pit shell was constructed using a gold price of US$3,900/oz and a
silver price of US$40/oz, with CIP processing recoveries of 93% for Au and 55% for Ag mineralisation.
(vi)
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
(vii) Numbers may not add due to rounding.
(viii) Mineral Resources have been reported on a 100% equity basis.
The resource model of the DKH deposit was updated with additional exploration and in-fill drilling
results. The modeling method and geostatistical estimation methods remained materially consistent
with the previous approach. As of 30 June 2026, no mining occurred at the DKH deposit. At the
selected cut-off grades, the resource estimate contains additional lower grade material, while
retaining its high-grade zones that include 78 Koz gold in all resource categories averaging 3.43
g/t at a cut-off grade of 0.6 g/t.
DKH gold deposit Mineral Resource estimates were prepared under the JORC Code (2012) and
updated as at 30 June 2026.
Table 6. DKH gold deposit Mineral Resource estimates as at 30 June 2026 (Notes):
Type
Oxide
Transitional
Fresh
Total
Indicated Mineral Resource
Gold
Tonnes
Grade
Gold
(Kt)
g/t Au
(Koz)
Inferred Mineral Resource
Gold
Tonnes
Grade
Gold
(Kt)
g/t Au
(Koz)
909
481
17
2.12
1.07
3.28
62
17
2
290
317
1
0.61
0.90
7.29
6
9
0.2
1,407
1.78
80
608
0.77
15
21
Notes:
(i)
The Statement of Estimates of Mineral Resources has been compiled by Mr Oyunbat Bat-Ochir, who is a
full-time employee of SLR Consulting LLC and a Member of the Australian Institute of Geoscientists. Mr
Bat-Ochir has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity that he has undertaken to qualify as a Competent Person as defined in the
JORC Code.
(ii)
All Mineral Resources figures reported in the table above represent estimates as of 30 June 2026. Mineral
Resource estimates are not precise calculations, being dependent on the interpretation of limited information on
the location, shape and continuity of the occurrence and on the available sampling results. The totals contained
in the above table have been rounded to reflect the relative uncertainty of the estimate. Rounding may cause
some computational discrepancies.
(iii)
Mineral Resources are reported on a dry in-situ basis.
(iv)
The Mineral Resource is reported using a 0.28 g/t Au cut-off grade in oxide and transition mineralisation and
0.85 g/t Au cut-off in fresh mineralisation and is constrained above the conceptual optimised pit shell with a pit
slope angle of 45 °. The conceptual optimised pit shell was constructed using a gold price of USD3,900 per oz
and a silver price of USD40 per oz with a processing recovery of 55% for Ag mineralisation.
(v)
Mineral Resources referred to above have not been subject to detailed economic analysis and therefore have not
been demonstrated to have actual economic viability.
During the reporting period, the Group updated mineral resource estimates for the AN deposit. The
updated figures represent estimates as at 30 June 2026, are based on drillings completed up to 1
October 2022 and updated metal prices. Metallurgical recoveries were based on preliminary test
work carried out on the AN deposit.
AN deposit Mineral Resource estimates were prepared under the JORC Code (2012) and updated
as at 30 June 2026.
Table 7. AN deposit Mineral Resource estimates as at 30 June 2026 (Notes):
Cut-off
AuEq g/t
Resource
Classification
0.18
Indicated
Inferred
Total
Grade
Quantity
Au
(Mt)
g/t
Contained Metal
Ag
g/t
Zn
g/t
Pb
g/t
AuEq
g/t
Au
Koz
Ag
Koz
Zn
Kt
Pb
Kt
AuEq
Koz
6.8
8.1
1.52 11.70
0.95 5.15
0.54
0.43
0.46
0.37
1.80
1.13
336 2,583
246 1,340
37
35
32
30
397
293
14.9
1.21
0.48
0.41
1.44
582 3,923
72
62
690
8.16
Notes:
(i)
JORC Code Standards for Mineral Resource (2012) is used for reporting of Mineral Resource.
(ii)
The Statement of Estimates of Mineral Resources has been compiled by Mr Oyunbat Bat-Ochir, who is a
full-time employee of SLR Consulting LLC and a Member of the Australian Institute of Geoscientists. Mr
Bat-Ochir has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity that he has undertaken to qualify as a Competent Person as defined in the
JORC Code.
(iii)
All Mineral Resources figures reported in the table above represent estimates as at 30 June 2026 and are based
on drilling completed up to 1st October, 2022. Mineral Resource estimates are not precise calculations, being
dependent on the interpretation of limited information on the location, shape and continuity of the occurrence
and on the available sampling results. The totals contained in the above table have been rounded to reflect the
relative uncertainty of the estimate. Rounding may cause some computational discrepancies.
22
(iv)
Mineral Resources are reported on a dry in-situ basis.
(v)
Reported at a 0.18 g/t AuEq cut-off above US$3,900/oz pit shell and 0.55 g/t AuEq below the same US$3,900/
oz pit shell. Cut-off parameters were selected based on an SLR internal cut-off calculator, which indicated that a
break-even cut-off grade of 0.18 g/t Au Equivalent above US$3,900/oz pit and 0.55 g/t AuEq below US$3,900/
oz pit, assuming a gold price of US$3,900 per ounce, a silver price of US$40 per ounce, zinc price of US$3,000
per tonne and lead price of US$2,000 per tonne, an open pit mining cost of US$2.75 per tonne and underground
mining cost of US$35 per tonne and a processing cost of US$16 per tonne milled and processing recovery of
88.8% Au, 80.6% Ag, 80.4% Pb and 69.1% Zn.
(vi)
Au Equivalent (AuEq) is calculated using metal price of US$3,900/oz for Au, US$40/oz for Ag, US$2,000/
tonne for Pb and US$3,000/tonne for Zn. Adjustment has been made for metallurgical recovery and is based on
the company ’s preliminary testwork results, which used flotation to separate concentrates, including a pyrite
concentrate, with credits only for Au and Ag. Based on grades and contained metal for Au, Ag, Pb and Zn, it is
assumed that all commodities have reasonable potential to be economically extractable.
a.
The formula used for Au equivalent grade is: AuEq g/t = Au g/t + Ag g/t*0.0093+Pb%*0.144+Zn%*0.186
with metallurgical recovery of 88.8% Au, 80.6% Ag, 80.4% Pb and 69.1% Zn.
b.
Au equivalent ounces are calculated by multiplying Mineral Resource tonnage by Au equivalent grade
and converting to ounces. The formula used for Au equivalent ounces is: AuEq Oz = Tonnage x AuEq
grade (g/t)/31.1035.
(vii) Mineral Resources referred to above have not been subject to detailed economic analysis and therefore have not
been demonstrated to have actual economic viability
The Mineral Resource estimate for UN exploration license was commissioned to incorporate data
from 56 surface diamond drill holes totalling 15,025 m drilled by EM in 2022. No mining occurred
at the license area to date. Mineral Resource has been constrained by topography, overburden
surface and the UN exploration license and reported above a gold cut-off grade of 0.15 g/t Au and
within a USD3,900 per oz optimised pit constraint for open cut resource and at a cut-off grade of
0.46 g/t Au below the USD3,900 per oz pit shell for the underground resource. Additional mining
design and more detailed and accurate cost estimates, mining studies, and test work are required to
confirm the viability of extraction.
UN deposit Mineral Resource estimates were prepared under the JORC Code (2012) and updated
as at 30 June 2026.
Table 8. UN deposit Mineral Resource, as at 30 June 2026 (Notes):
Quantity
(Mt)
Gold
Grade
(Au g/t)
Indicated
Inferred
2.3
1.5
Total
3.8
Resource
Classification
Gold
(Koz)
Silver
Grade
(Ag g/t)
Silver
(Koz)
1.30
1.10
94
54
0.93
0.56
68
28
1.22
149
0.78
96
Reserve estimates for gold and silver contained within Khundii mining license area were prepared
for BKH and DKH deposits in accordance with the JORC Code (2012) standards. During the
reporting period, the JORC Reserve optimisation assumptions were updated to reflect the latest
technical studies, operating parameters, and forecasts at the BKH mine. Additionally, metal price
assumptions were updated, reflecting current market forecasts.
23
Table 9. Khundii mining license JORC (2012) compliant Mineral Reserves estimate, as at 1 July
2026 (Notes):
BKH deposit:
Tonnage
(Mt)
Grade
(g/t Au)
Contained
Gold
(Koz)
Proven
Probable
2.8
4.9
2.11
1.51
189
239
1.11
1.13
99
179
Total
7.7
1.73
428
1.12
278
Classification
Grade
(g/t Ag)
Contained
Silver
(Koz)
Notes:
(i)
The effective date of the Ore Reserve Estimate is 1 July 2026.
(ii)
The Ore Reserve Estimate has been prepared in accordance with the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012 Edition). The technical
information supporting the Ore Reserve Estimate has been compiled by Mr. Buyan-Ulzii Narankhuu, a Member
of AusIMM (Member #327826), who is a Competent Person as defined by the JORC Code (2012).
(iii)
The Ore Reserve Estimate is based on conventional open-pit mining method. Mining assumptions include a
mining cost of US$2.62/t mined, an incremental mining cost of US$0.028/t-m per bench, ore dilution of 10%,
and ore loss of 2.5%.
(iv)
Pit designs and Ore Reserve estimation are based on geotechnical parameters developed by Fugro. Overall
slope angles ranging from 40 ° to 45 ° were adopted for the Bayan Khundii deposit based on the March 2021
geotechnical assessment.
(v)
A metal price of US$3,900/oz gold and US$40/oz silver was applied for pit optimisation and reserve
determination. Sensitivity analyses were undertaken using a range of gold prices to evaluate project robustness.
(vi)
Mining, processing, and administrative cost assumptions applied in the Ore Reserve Estimate are based on
current operating and technical study parameters, including a mining cost of US$2.62 per tonne mined, a
processing cost of US$33.57 per tonne of ore processed, an additional processing cost of US$0.52 per tonne, a
general and administration cost of US$3.67 per tonne processed, and an annual process plant throughput of 650
ktpa.
(vii) Metallurgical recovery assumptions are based on test work completed by BCR. Gold recovery for the Bayan
Khundii deposit is variable and has been estimated using a recovery formula derived from metallurgical test
work. Silver recovery for Bayan Khundii is estimated at 55%.
(viii) Royalties and selling costs applied in the Ore Reserve Estimate include a gold royalty of 5% plus an additional
1% royalty payable to Sandstorm Gold Ltd., a silver royalty of 5% plus an additional 3% royalty, and selling
costs of US$9.75/oz payable metal.
(ix)
Estimate has been rounded to reflect accuracy.
24
DKH deposit:
Tonnage
(Mt)
Grade
(g/t Au)
Contained
Gold
(Koz)
Grade
(g/t Ag)
Contained
Silver
(Koz)
Proven
Probable
–
0.8
–
2.67
–
67
–
1.85
–
46
Total
0.8
2.67
67
1.85
46
Classification
Notes:
(i)
The effective date of the Ore Reserve Estimate is 1 July 2026.
(ii)
The Ore Reserve Estimate has been prepared in accordance with the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012 Edition). The technical
information supporting the Ore Reserve Estimate has been compiled by Mr. Buyan-Ulzii Narankhuu, a Member
of AusIMM (Member #327826), who is a Competent Person as defined by the JORC Code (2012).
(iii)
The Ore Reserve Estimate is based on a conventional open-pit mining method. Mining assumptions include a
mining cost of US$2.62/t mined, an incremental mining cost of US$0.028/t-m per bench, ore dilution of 10%,
and ore loss of 2.5%.
(iv)
Pit designs and Ore Reserve estimation are based on geotechnical parameters developed by Fugro. Overall
slope angles ranging from 40 ° to 45 ° were adopted for the Dark Horse deposit based on the February 2024
geotechnical assessment.
(v)
A metal price of US$3,900/oz gold and US$40/oz silver was applied for pit optimisation and reserve
determination. Sensitivity analyses were undertaken using a range of gold prices to evaluate project robustness.
(vi)
Mining, processing, and administrative cost assumptions applied in the Ore Reserve Estimate are based on
current operating and technical study parameters, including a mining cost of US$2.62 per tonne mined, a
processing cost of US$33.57 per tonne of ore processed, an additional processing cost of US$0.52 per tonne, a
general and administration cost of US$3.67 per tonne processed, and an annual process plant throughput of 650
ktpa.
(vii) Metallurgical recovery assumptions are based on test work completed by BCR in 2023. Gold recovery for the
Dark Horse deposit is estimated at 89%, while silver recovery is estimated at 55%.
(viii) Royalties and selling costs applied in the Ore Reserve Estimate include a gold royalty of 5% plus an additional
1% royalty payable to Sandstorm Gold Ltd., a silver royalty of 5% plus an additional 3% royalty, and selling
costs of US$9.75/oz payable metal.
(ix)
Estimate has been rounded to reflect accuracy.
25
Resource estimates for copper and other metals contained within WTH mining license area were
prepared under the JORC Code (2012).
Table 10. WTH Mineral Resource estimate, as at 31 December 2025 (Notes):
Classification
Ore
(Mt)
Metal contained
Cu
Au
(kt)
(Koz)
Ag
(Koz)
CuEq
(kt)
Measured
Indicated
Inferred
2.1
7.6
2.3
47
98
17
19
33
4
911
1,511
200
52
107
18
Total
12.1
162
56
2,622
177
Notes:
1.
The Mineral Resource is reported at a 0.17% CuEq cut-off for oxide mineralisation and 0.2% CuEq cut-off
for transition and fresh mineralisation within an optimised pit shell derived using a price of USD9,546 per
tonne for Cu and USD2,962 per oz for Au, USD36 per oz for Ag which equates to 110% of the long-term
consensus commodity price forecast as of October 2025. Cut-off parameters were selected based on an Glogex
internal cut-off calculator, which indicated a break-even cut-off grade of 0.17% CuEq for oxide, 0.2% CuEq for
transition/fresh mineralisation, a USD9,546 per tonne Cu, a USD2,962 per troy oz gold and USD36 per troy oz
silver price, processing cost of USD8 per tonne milled for oxide, processing cost of USD12 per tonne milled for
trans/fresh mineralisation, general and administration cost of USD1.5 per tonne mined, mining dilution of 5%
and ore loss of 5% and processing recovery of 60% Cu and 45% Au for oxide, 85.3% Cu, 36.2% Au and 65.9%
for Ag recoveries for transition and fresh mineralisation with flotation processing to produce Cu concentrate
with Au and Ag credits. No mining cost was used in break-even cut-off grade calculation while mining cost of
USD1.8 per tonne was used in pit optimisation.
The formula used for Cu equivalent grade are: Oxide CuEq % = Cu % + Au ppm * 0.74827, assuming 60%
Cu and 45% Au metallurgical recoveries. Transition/fresh CuEq % = Cu % + Au ppm * 0.42340 + Ag ppm
*0.00944 assuming 85.3% Cu, 36.2% Au and 65.9% Ag metallurgical recoveries.
Cu equivalent tonnes are calculated by multiplying Mineral Resource tonnage by Cu equivalent grade and
converting for tonnes. The formula used for Cu equivalent tonne is: CuEq t = Tonnage x CuEq grade (%)/100.
Resource estimates for gold and silver contained within URT mining license area were prepared
under the JORC Code (2012).
Table 11. URT Mineral Resource estimate, as at 31 December 2025 (Notes):
Classification
Ore
(Mt)
Metal contained
Ag
Au
(Koz)
(Koz)
AgEq
(Koz)
Indicated
Inferred
17.6
29.5
13,557
22,785
49
86
16,421
27,751
Total
47.1
36,342
135
44,172
26
Notes:
1.
The Mineral Resource is reported at a 16 g/t AgEq cut-off within the USD50 per oz for Ag and USD3,000 per
oz Au pit shell for the resource. Cut-off parameters were selected based on an Glogex internal cut-off calculator,
which indicated a break-even cut-off grade of 16 g/t AgEq, an open cut mining method, a USD50 per oz silver
price, a USD3,000 per oz gold price, an open cut mining cost of USD1.45 per tonne, a processing cost of
USD12 per tonne milled, general and administration cost of USD1 per tonne mined, mining dilution of 2% and
ore loss of 2% and processing recovery of 90.7% Ag and 87.8% Au with flotation processing to produce Ag and
Au concentrate.
The formula used for Au equivalent grade is: AgEq g/t = Ag g/t + Au g/t*58.08 and assumes 90.7% and 87.8%
metallurgical recoveries for Ag and Au respectively.
Ag equivalent oz are calculated multiplying Mineral Resource tonnage by Ag equivalent grade and converting
for oz. The formula used for Ag equivalent oz is: AgEq oz = Tonnage x AgEq grade (g/t)/31.1035.
Mineral Resources have been reported on a 100% equity basis.
Mineral Resources referred to above, have not been subject to detailed economic analysis and, therefore, have
not been demonstrated to have actual economic viability.
During the second half of 2026, the Group plans to perform works such as geological and
hydrogeological exploration drilling and modeling, bulk sampling, metallurgical testing to obtain
the required inputs for preparation of the relevant technical reports (including updated JORC
Resource and Reserve statements) and complete feasibility study for advancing development within
areas covered under minerals exploitation special permits held by UCC.
Production and Sales
The BKH processing plant, which has annual nameplate capacity of 650 Kt ore feed, consists
of single stage crushing, two-stage grinding via a semi-autogenous followed by ball grinding
circuit, cyanide leaching, adsorption via carbon-in-pulp methods, elution via the pressure zadra,
electrowinning and furnace smelting to produce doré (unrefined gold-silver) bars.
Following the commencement of commercial production in September 2025, the management
has been focusing on refining its operations at the BKH gold mine with improved ore control and
mine-to-mill practices which significantly reduced dilution and ore loss. During the first half of
2026, the Group mined and processed 402.1 Kt and 303.9 Kt of ore, respectively. The average gold
grade of processed ore was 2.2 g/t with recovery rate of 96.3%.
The Group sold 20,236 oz of gold and 6,452 oz of silver to the BoM and its authorised commercial
banks during the six months ended 30 June 2026, generating total revenue of USD94.7 million.
ASP was USD4,654 per oz for gold and USD76 per oz for silver, respectively, during the reporting
period.
27
Cost of Revenue
Mining costs cover overburden and topsoil removal, and ore extraction, including costs related to
staff, equipment, fuel cost, and fees to drilling and blasting contractors. Processing costs include
staff cost, ore crushing and grinding cost, power and water costs, reagents and consumables, and
maintenance costs.
Table 12. Cost of revenue:
Six months
ended 30
June 2026
(USD ’000)
Cost of revenue
45,915
Mining cost
Variable cost
Fixed cost
Depreciation and amortisation
11,874
7,055
2,652
2,167
Processing cost
Variable cost
Fixed cost
Depreciation and amortisation
20,470
14,242
4,358
1,870
Site administration cost
7,670
Royalty and fees (including assay
cost and transportation cost)
5,901
SUSTAINABILITY
The Group was the first company in Mongolia to adopt and implement the Towards Sustainable
Mining ( “ TSM ” ) standard since 2023, which is a globally recognised sustainability program
developed by the Mining Association of Canada ( “ MAC ” ) to support mining companies in
managing key environmental and social risks. During the reporting period, the Group completed its
regular annual TSM self-assessment. The self-assessment scores and externally verified scores are
publicly reported and accessible at MAC’s website.
In the latest assessment, the Group made progress under the Indigenous and Community
Relationships protocol, with improvements recorded across community of interest identification,
engagement and dialogue, response mechanism, and impact and benefit management. The Group
recorded its first results under the Equitable, Diverse, and Inclusive Workplace protocol, and the
Tailings Management protocol remain areas of focus for further improvement.
The Group maintains its ISO Management System, which covers ISO 14001 Environmental
Management and ISO 45001 Occupational Health and Safety certifications, while continuing the
implementation of the newly adopted ISO 46001 Water Efficiency Management Systems.
28
People and Safety
As of 30 June 2026, the Group had 3,366 employees (as of 30 June 2025: 3,105 employees),
including 2,923 employees in its coking (metallurgical) coal operations and 443 employees in its
gold and metals operations. 1,256 employees were recruited locally at both operations, representing
37% of total workforce. Female employees represented 14% of the total workforce and 37% of
management positions.
Employees are remunerated with reference to individual performance, experience, qualification and
prevailing salary trends in the local market. With reference to the Group’s financial and operational
performance, employees may also enjoy other benefits such as discretionary bonus and share
options pursuant to the Company’s Share Option Scheme. On 2 July 2026, the Parliament adopted
amendments to the General Law on Social Insurance, which will be effective from 1 January 2027,
which cap the earnings base for employer social insurance contributions, reduce industrial accident
insurance contribution rates and introduce a voluntary pension savings mechanism. The Group
expects the amendments to have a positive impact on employees.
The Group remains focused on capacity building across its workforce, with 18,944 training
participations recorded within the coking (metallurgical) coal operations across more than 160
programs and 3,242 training participations recorded within the gold and metals operations across
151 training sessions covering safety, professional development and general skills in the first
half of 2026. Five rounds of heavy machinery operator training resulted in the certification of 95
individuals.
The Group’s coking (metallurgical) coal operations recorded 8.7 million man-hours worked with 3
Lost Time Injuries (“LTIs”) in the first half of 2026, resulting in Lost Time Injury Frequency Rate
(“LTIFR”) of 0.34 LTIs per million man-hours worked (1H2025: 0.76), while its gold and metals
operations recorded 1.0 million man-hours worked with 1 LTI, representing an LTIFR of 1.00 per
million man-hours worked (1H2025: 0.00). No fatalities were recorded during the reporting period
at the Group’s operations.
OUTLOOK AND BUSINESS STRATEGIES IN 2026
This section in this announcement includes forward-looking statements. These forwardlooking statements are based on the Company’s expectations and beliefs concerning future
events and involve risks and uncertainties that may cause actual results to differ materially
from current expectations. These factors are difficult to predict accurately and may be
beyond the Company’s control.
The Company remains fully committed to pursuing its key strategies in order to maintain and
enhance its competitive position as the largest internationally listed private mining company with
operations focused on and located in Mongolia: (i) maintaining an adequate capital structure by
implementing prudent financial policy; (ii) scaling up production and sales volumes by maximising
assets utilisation; (iii) supporting the initiatives to improve and develop regional infrastructure; (iv)
exploring opportunities for expanding and diversifying its business operations through potential
strategic cooperation and joint venture arrangements, and also identifying possible investment
targets, preferably in Mongolia; and (v) adhering to safety, environment and socially responsible
operations.
29
Forward-looking statements in this announcement or elsewhere speak only as of the date made.
New uncertainties and risks arise from time to time, and it is impossible for the Company to
predict these events or how they may affect the Company. Except as required by law, the Company
has no duty to, and does not intend to, update or revise the forward-looking statements in this
announcement or elsewhere after the date this announcement is issued.
Investors should note that undue reliance on or use of the above information may cause
investment risks.
FINANCIAL REVIEW
Revenue
The Group generated a total revenue of USD586.2 million during the first half of 2026 (1H2025:
USD346.6 million), of which USD491.5 million was attributable to its coking (metallurgical) coal
operations and USD94.7 million was attributable to its gold and metals operations, representing
84% and 16% of the total revenue, respectively.
Cost of revenue and gross profit
Total cost of revenue amounted to USD451.3 million in the first half of 2026 (1H2025: USD283.8
million), comprising USD405.4 million attributable to the coking (metallurgical) coal operations
and USD45.9 million to the gold and metals operations.
The Group recorded a gross profit of USD134.9 million for the first half of 2026, compared to
USD62.9 million in the first half of 2025.
Selling and distribution costs
Selling and distribution costs relate to the Group’s coal sales activities in China and mainly
comprise agent fees, warehousing and handling costs, and regulatory fees incurred in connection
with coal imports into China. Selling and distribution costs were USD17.5 million during the first
half of 2026, compared with USD15.8 million in the corresponding period in 2025.
General and administrative expenses
General and administrative expenses primarily relate to staff costs, share option expenses,
consultancy and professional fees, donations, depreciation and amortisation of office equipment
and other expenses. For the six months ended 30 June 2026, the Group ’s general and administrative
expenses were USD15.7 million (1H2025: USD12.7 million). The increase in general and
administrative expenses was mainly attributable to higher staff costs due to increase in headcount.
Indebtedness and net finance costs
As at 30 June 2026, the Group’s outstanding indebtedness was USD400.0 million, consisting of
USD350.0 million Senior Notes due 2030 and USD50.0 million bank borrowing obtained by EM
(USD40.0 million outstanding as at the date of this announcement).
Net finance costs primarily comprised (i) interest expense on the Senior Notes due 2030; (ii)
interest expense on the bank borrowing; (iii) foreign exchange gains and losses; and (iv) interest
income from cash and cash equivalents. Net finance costs decreased to USD18.9 million during the
reporting period from USD27.2 million in the corresponding period of 2025.
30
A breakdown of net finance costs, borrowings and Senior Notes is set out in notes 5, 13 and 14 to
the consolidated financial statements.
The Group ’ s gearing ratio, calculated based on the carrying amount of total bank and other
borrowings divided by total assets, was 16% as at 30 June 2026 (31 December 2025: 17%).
Profit for the period
The Group’s profit and the profit attributable to equity shareholders of the Company for the first
half of 2026 was USD105.9 million and USD89.0 million, respectively (1H2025: loss and loss
attributable to equity shareholders of the Company of USD19.9 million and USD23.3 million,
respectively). The increase in profit was primarily attributable to higher washed coking coal sales
volume and ASP, profit contribution from the Group’s gold and metals segment, and other net
income.
Non-IFRS measure
The Group’s adjusted EBITDA for the reporting period was USD169.2 million (1H2025: USD94.1
million), with 70% from its coking (metallurgical) coal operations and 30% from its gold and
metals operations. Adjusted EBITDA is not a recognised measure of financial performance or
liquidity under IFRS. It is used by management to monitor the underlying performance of the
business and operations and is presented as an important supplemental measure of performance.
The Group believes that this measure is widely used within the industry in which the Group
operates to evaluate operating performance and liquidity. As non-IFRS financial measures are
not uniformly defined and may not be calculated on a consistent basis across companies, adjusted
EBITDA may not be directly comparable with similarly titled measures presented by other
companies.
Cash flow
Table 13. Combined cash flow:
Six months ended 30 June
2026
2025
(USD ’000)
(USD ’000)
Net cash generated from operating activities
Net cash used in investing activities1
Net cash (used in)/generated from financing activities
Net increase in cash and cash equivalents
Cash and cash equivalents at the beginning of the period
Effect of foreign exchange rate changes
Cash and cash equivalents at the end of the period
180,139
(90,749)
(23,989)
65,401
223,948
5,060
294,409
93,209
(118,341)
103,629
78,497
140,521
694
219,712
Note:
1.
USD76.9 million was attributable to the coking (metallurgical) coal segment, comprising (i) USD67.4 million
used for deferred stripping activities; (ii) USD13.1 million used for the acquisition of property, plant and
equipment; and (iii) USD3.6 million interest receipt. USD13.8 million was attributable to the gold and metals
segment, comprising (i) USD5.3 million used for deferred stripping activities; (ii) USD2.8 million used for the
acquisition of property, plant and equipment; (iii) USD6.0 million of deferred consideration paid in relation to
the acquisition of UCC; and (iv) USD0.3 million interest receipt.
31
Capital commitments and capital expenditures
As at 30 June 2026 and 31 December 2025, the capital commitments were as follows:
Table 14. Capital commitments:
As at
30 June
2026
(USD ’000)
As at
31 December
2025
(USD’000)
Contracted for
Authorised but not contracted for
19,879
3,831
10,155
22,502
Total
23,710
32,657
Table 15. The Group’s historical capital expenditure for the periods indicated:
Six months ended 30 June
2026
2025
(USD ’000)
(USD ’000)
CHPP
BKH mine capital development
Trucks and equipment
Others
236
2,764
–
12,857
708
28,557
17,052
10,227
Total
15,857
56,543
Foreign exchange risk
As at 30 June 2026, the Group’s cash and cash equivalents were mainly held in RMB, USD and
MNT.
The Group’s coal sales are denominated mainly in RMB, while its gold and silver sales to BoM are
settled in MNT. All borrowings of the Group are denominated in USD.
Significant investments held
As at 30 June 2026, the Company did not hold any significant investment.
Material acquisitions and disposal of subsidiaries, associated companies and joint ventures
For the six months ended 30 June 2026, the Company did not have any material acquisitions and
disposals of subsidiaries, associated companies and joint ventures.
32
Contingent liabilities
As at 30 June 2026, the Company has contingent liability in respect of the consideration
adjustments for the acquisition of BN mine pursuant to the share purchase agreement entered into
by and among the Company, its subsidiary Mongolian Coal Corporation Limited, Quincunx (BVI)
Ltd. and Kerry Mining (Mongolia) Limited on 31 May 2011 in relation to the acquisition of the
entire share capital of Baruun Naran Limited (formerly known as QGX Coal Ltd.), which may arise
from the royalty provision. Under the royalty provision, an additional LOM payment of USD6 per
tonne may be payable in each semi-annual period, if the specified semi-annual ROM production
exceeds 5.0 Mt. The Company considers the probability of royalty provision to be very low.
Purchase, Sale or Redemption of the Company’s Listed Securities
During the six months ended 30 June 2026, the Company repurchased a total of 4,524,000 of
its own shares on the Stock Exchange at an aggregate cost of approximately HKD41.3 million
(equivalent to USD5.3 million), of which 3,126,000 shares were cancelled during the reporting
period. The remaining 1,398,000 repurchased shares were subsequently cancelled on 10 August
2026.
Save as disclosed above, neither the Company nor any of its subsidiaries had purchased, sold or
redeemed any of the Company’s listed securities or sold any treasury shares during the reporting
period.
The Company intends to continue repurchasing its shares after comprehensively considering its
business prospects, operating performance, financial condition, future profitability, and the recent
performance of its shares in the secondary market.
Other and subsequent events
In July 2026, the Company repurchased a total of 10,950,000 of its own shares on the Stock
Exchange at an aggregate cost of approximately HKD73.5 million (equivalent to USD9.4 million).
The repurchased shares were subsequently cancelled.
Save as disclosed in this interim results announcement, there have been no events subsequent to 30
June 2026 which require adjustment to or disclosure in this interim results announcement.
Dividend
The Board does not recommend the payment of dividend in respect of the six months ended 30
June 2026 (dividend for the six months ended 30 June 2025: nil).
Model Code for Securities Transactions
The Company has adopted the Model Code for Securities Transactions by Directors of Listed
Issuers (the “Model Code”) as set out in Appendix C3 to the Listing Rules. Specific enquiry has
been made to all the Directors and all the Directors have confirmed that they have complied with
the Model Code throughout the six months ended 30 June 2026.
The Company has also established written guidelines on no less exacting terms than the Model
Code for securities transactions by relevant employees (the “Employees Written Guideline”) who
are likely to possess inside information of the Company. No incident of non-compliance with the
Employees Written Guideline by the employees was noted by the Company during the reporting
period.
33
Corporate Governance
The Company has adopted the code provisions set out in the Corporate Governance Code (the “CG
Code”) as contained in Appendix C1 to the Listing Rules as its code of corporate governance and
has complied with all applicable code provisions set out in the CG Code during the six months
ended 30 June 2026.
Review by Audit Committee
The Audit Committee of the Company currently comprises one non-executive Director, Ms.
Enkhtuvshin Gombo, and three independent non-executive Directors, namely Mr. Chan Tze Ching,
Ignatius, Ms. Delgerjargal Bayanjargal and Dr. Tsend-Ayush Tuvshintur. Mr. Chan Tze Ching,
Ignatius is the chairman of the Audit Committee.
The Audit Committee of the Company, together with the management, have reviewed the
accounting principles and practice adopted by the Group, and also discussed issues related to
financial reporting, including the review of the Group’s unaudited interim results for the period
under review. The Audit Committee is of the opinion that such statements comply with the
applicable accounting standards, the Listing Rules and legal requirements, and that adequate
disclosures have been made.
The interim financial results are unaudited but derived from the interim financial report reviewed
by KPMG in accordance with Hong Kong Standard on Review Engagements 2410, Review of
Interim Financial Information Performed by the Independent Auditor of the Entity , issued by the
Hong Kong Institute of Certified Public Accountants.
Publication of the 2026 Unaudited Consolidated Interim Results and 2026 Interim Report
This interim results announcement is published on the websites of the Hong Kong Exchanges and
Clearing Limited (www.hkexnews.hk) and the Company (www.mmc.mn), and the 2026 Interim
Report containing all the information required by the Listing Rules will be published on the
above-mentioned websites in due course.
For and on behalf of the Board
Mongolian Mining Corporation
Odjargal Jambaljamts
Chairman
Hong Kong, 20 August 2026
As at the date of this announcement, the Board consists of Mr. Odjargal Jambaljamts and Dr.
Battsengel Gotov, being the executive Directors, Ms. Enkhtuvshin Gombo and Mr. Ariunbayar
Byambadorj, being the non-executive Directors, and Mr. Chan Tze Ching, Ignatius, Ms.
Delgerjargal Bayanjargal and Dr. Tsend-Ayush Tuvshintur, being the independent non-executive
Directors.