Metals Exploration plc (AIM: MTL) (“Metals Exploration”, the “Company” or, together with its subsidiaries, the “Group”), a gold production, exploration and development company with assets in the Philippines and Nicaragua, announces its unaudited…
Metals Exploration plc (AIM: MTL) (“Metals Exploration”, the “Company” or, together with its subsidiaries, the “Group”), a gold production, exploration and development company with assets in the Philippines and Nicaragua, announces its unaudited interim results for the six months ended 30 June 2026 (“H1 2026” or the “Period”). The results will be made available on the Company’s website at www.metalsexploration.com.
Highlights
-
H1 2026 positive free cash flow of US$54.7 million (H1 2025: US$70.7 million) from operations - funding development at the La India gold project (the “Project”);
-
H1 2026 earnings before tax, interest, depreciation, amortisation, impairment and share-based charges of US$55.9 million (H1 2025: US$72.3 million);
-
H1 2026 gold production of 21,451 ounces (“oz”) (H1 2025: 40,985 oz);
-
H1 2026 gold recoveries of 80.7% (H1 2025: 91.4%); and
-
Construction and development of the Project in Nicaragua 56% complete as at 30 June 2026, and 74.4% complete as at the day of this report, with first gold pour on track for December 2026.
Production Summary
| Runruno Project | | | | | |
| Production Summary | | | Actual | Actual | Actual |
| | Units | | 6 Months to 30 June 2026 | 6 Months to 30 June 2025 | 12 Months to 31 December 2025 |
| Mining | | | | | |
| Ore Mined | Tonnes | | 566,049 | 1,028,333 | 2,142,187 |
| Waste Mined | Tonnes | | 5,303,507 | 4,889,310 | 8,557,364 |
| Total Mined | Tonnes | | 5,869,556 | 5,917,643 | 10,699,551 |
| Au Grade Mined | g/tonne | | 1.02 | 1.54 | 1.28 |
| Strip Ratio | | | 7.26 | 4.65 | 3.92 |
| Processing | | | | | |
| Ore Milled | Tonnes | | 952,585 | 1,041,486 | 1,902,702 |
| Gold (Au) Grade | g/tonne | | 0.87 | 1.34 | 1.21 |
| Sulphur Grade | % | | 1.06 | 1.18 | 1.19 |
| Au Milled (contained) | Ounces | | 26,591 | 44,841 | 73,844 |
| Recovery | % | | 80.7 | 91.4 | 88.4 |
| Au Poured | Ounces | | 21,451 | 40,985 | 65,287 |
| Sales | | | | | |
| Au Sold | Ounces | | 21,373 | 41,240 | 66,082 |
| Au Price | US$/oz | | 4,677 | 2,884 | 3,154 |
Darren Bowden, CEO of Metals Exploration, commented:
“The first half of 2026 has been a period of significant progress for Metals Exploration. At Runruno, despite lower grades and recoveries as operations run-down to closure, the Company continued to generate substantial revenues, delivering free cash flow of US$54.7 million and further strengthening our balance sheet.
“At La India, construction continued to advance well, reaching 56% completion by the end of the Period. We achieved a number of key milestones, including the ongoing installation of major process plant infrastructure, the arrival of long-lead equipment and the commencement of mine fleet mobilisation. We are particularly proud that, after approximately two million hours worked, the Project remains free of lost time injuries, reflecting the successful transfer of the Group's safety culture and the dedication of our workforce and contractors in Nicaragua.
“While Project costs have been impacted by higher logistics expenses and import duties, first gold pour remains on track for December 2026. The recent US$27 million equipment financing facility further strengthens our funding position as we move towards commissioning.
“The Batong Buhay agreements represent an exciting addition to our Philippine growth pipeline. With encouraging historical drilling results, we look forward to advancing our understanding of the project's potential through a modern exploration programme.
“The Group was also pleased to release its sixth sustainability report for Runruno, covering our sustainability performance for 2025. The report outlines the significant environmental and community work that has been undertaken at Runruno, and it is our objective to mirror this in Nicaragua. Additionally, I am pleased to note that Runruno has maintained its strong safety performance, with 3.95 million hours worked without a lost time injury as at the end of the Period.
“Looking ahead, our priorities are clear: delivering La India into production safely and efficiently, maximising remaining value at Runruno as mining winds down, and advancing our exciting exploration portfolio in both Nicaragua and the Philippines. We believe these activities will continue to support the Company's growth and create long-term value for our shareholders.”
Nicaragua
La India Development
The La India gold project is approximately a two-hour drive from the Nicaraguan capital city, Managua. Construction activities progressed with overall construction on-track at 74.4% complete as at the date of this report (31 December 2025: 33% complete).
The total Project budget has marginally increased to c.US$180 million due to unforeseen logistics costs and new import duties imposed on certain imported goods. The first gold pour at La India remains on track for December 2026.
Highlights for H1 2026 and post-Period end include:
-
c. 2 million hours worked with no lost time injuries (“LTI”). The Company considers this an exceptional safety record given the start-up nature of this owner operated construction project. The successful transfer of the Company’s safety culture from the Philippines to Nicaragua is a testament to all employees and contractors in Nicaragua, who are congratulated on this ongoing achievement.
-
Civil foundations progressed to 90% complete, with concrete and rebar installation ongoing across the tailings area (thickener and detox tank foundations), gold room, pebble crusher and reagents areas.
-
Structural, mechanical, piping and electrical installation (“SMPEI”) is being delivered by Duroblock S.A., with Degbed Company Limited as specialist mill installation contractor. This has progressed across the process plant with the CIL 10 tanks ring fit-out being completed.
-
Mechanical erection of the SAG mill feed conveyor (CV-004), pebble crusher and grinding circuit structure continued, with Level 1 steelwork installed around the SAG mill and progressing around the ball mill.
-
Long lead items delivered to site included the cooling water surge tank, gold room hopper, agitators and primary crusher components.
-
The thickener arrived on site, with shake-out and support column installation underway. Ring installation on the first Detox Tank also commenced.
-
The on-site laboratory was completed and became fully functional in early August 2026.
-
Bulk earthworks progressed to 93% complete; cumulative material delivered to the ROM pad reached 211,000 tonnes, against the 500,000-tonne pre-commissioning target.
-
The first units of the Group’s initial mine fleet arrived on site. The first ten 777 Caterpillar (“CAT”) dump trucks, and two CAT 6020 excavators are on site and operational. A further five haul trucks, a third excavator, two wheel loaders, a telehandler and a second bulldozer also arrived on site during H2 2026 in-line with a ramp up of mining operations via the Company’s owner-operator mining model.
-
Foundation improvement for Stage 1 of the tailings storage facility (“TSF”) has been completed, and backfilling of the starter dam has commenced.
-
The main risk to the construction schedule remains the completion of the main-grid power transmission connection. This risk arises due the third party delivery of key infrastructure and the connection itself. However, the Company is working closely with Entrail (the government power company) in an endeavour to ensure that delivery meets Project timelines.
La India Exploration
Drilling of the La India project areas by the previous Condor management outlined a 2.2 million ounce (“Moz”) gold resource in, and around, the La India project area. Since acquiring the Project, the Company’s focus has been on initial pit in-fill grade confirmation drilling, extensional drilling from planned mining areas and the Cacao prospect. Please refer to the Company’s announcement dated 16 July 2026 for further information.
Also, during H1 2026, the Company was granted four new exploration tenements in the La Crecia area. Preliminary exploration, including a maiden drill programme is underway. Please refer to the Company’s announcement dated 10 April 2026 for further information.
Finance
Since Period end, the Company secured a US$27 million equipment loan from a Nicaraguan located bank, which was fully drawn down in August and September 2026. Please refer to the Company’s announcements dated 21 August 2026 and 25 September 2026 for further information.
Philippines
Review of Runruno Gold Mine Operations
Health and Safety
No LTI has been recorded at Runruno since 30 March 2025, finishing the reporting period with 3.95 million hours since the last reported LTI. The health and safety of all employees and contractors remains a key priority to the Company. The Company remains incredibly proud of its exceptional safety record achieved by employees and contractors in the Philippines.
Finance
Gold sales were 21,373 oz for revenues of US$100.0 million (H1 2025: 41,240 oz for revenues of US$118.9 million) at an average price of US$4,677 per oz (H1 2025: US$2,884 per oz), resulting in positive free cash flow of US$54.7 million (H1 2025: US$70.7 million).
Mining
Mining production of ore and waste was 5.9 million tonnes (“Mt”) for H1 2026 (H1 2025: 5.9Mt). Total ore mined was lower at 0.6Mt (H1 2025: 1.0Mt), and at a lower grade of 1.02 grammes per tonne (“g/t”) (H1 2025: 1.54g/t). Current forecasts confirm that mining operations at Runruno will cease in Q4 2026.
Process plant
Gold production during H1 2026 was 21,451 oz (H1 2025: 40,985 oz). Throughput for H1 2026 was 0.95Mt (H1 2025: 1.04Mt) at a head grade of 0.87g/t (H1 2025: 1.34g/t). Average overall gold recovery in H1 2026 was 80.7% (H1 2025: 91.4%).
Both head grade and average recovery are expected to improve during H2 2026 as ore from deeper levels of Stages 5 and 6 of the mine are accessed and processed.
Unplanned process plant downtime during H1 2026 did not materially interrupt production and consisted mainly of disruption to the BIOX circuit due to contaminated ore and power interruptions. Other unplanned downtime resulted from repairs to the return discharge and final tails lines, switchyard, agitator gearbox, conveyor belts, rollers and trommel panel screens.
Residual Storage Impoundment (“RSI”)
The RSI in-rock spillway is approaching completion and fully operational, designed to handle a maximum probable flood event. The Company has an ongoing RSI maintenance and monitoring obligation which lasts for 10-years following the end of processing operations at Runruno. The day-to-day performance of the RSI continues to be monitored by an independent consulting group.
Community & Government Relations
Productive relations with both the community and the Philippine government continue.
Sustainability
On 9 April 2026, the Company released its 2025 Sustainability Report, which covers its sustainability performance in the Philippines for the year ended 31 December 2025. This report can be found on the Company’s website at: www.metalsexploration.com/esg/esg-overview/.
Philippine Exploration
Batong Buhay Project
As announced on 15 June 2026, Metals Exploration has signed a series of agreements to develop the Batong Buhay Porphyry Copper-Gold Project. Located c. 200km north of Runruno, Batong Buhay was drilled in the late 1970s via a 21-hole drilling programme. The main porphyry target, Dickson, has a historical non-JORC compliant resource of 86.9 million tonnes at 0.83% copper equivalent (“CuEq”) from surface.
Historical drill intercepts include:
Dickson:
-
DDH-6A, 160.93m at 0.92% copper (“Cu”) and 0.60 g/t gold (“Au”) (1.48% CuEq)
-
DDH-10, 182.88m at 0.73% Cu and 0.36 g/t Au (1.06% CuEq)
-
DDH-12, 173.74m at 0.33% Cu and 0.95 g/t Au (1.21% CuEq)
Maalinao North:
-
DDH-02, 198.12m at 1.15% Cu and 0.10 g/t Au (1.24% CuEq)
-
DDH-01, 134.36m at 0.76% Cu and 0.16 g/t Au (0.91% CuEq)
The Company has commenced pre-drilling activities that will determine the design of a drilling campaign which is expected to commence in Q4 2026.
Abra Project
The National Commission for Indigenous Peoples (“NCIP”) process to advance, and finalise, their consultation activities with the impacted local indigenous communities continues. No exploration work was undertaken during the Period.
For further information please visit or contact www.metalsexploration.com
| Metals Exploration PLC | |
| Via BlytheRay | +44 (0) 207 138 3204 |
| Nominated & Financial Adviser: | STRAND HANSON LIMITED |
| James Spinney, James Dance, Rob Patrick | +44 (0) 207 409 3494 |
| Joint Broker: | HANNAM & PARTNERS |
| Matt Hasson, Sam Quinn | +44 (0) 207 907 8500 |
| Joint Broker: | PANMURE LIBERUM |
| Scott Mathieson, Amrit Mahbubani, Zak Wadud | +44 (0) 203 100 2000 |
| Public Relations: | BLYTHERAY |
| Megan Ray, Said Izagaren | +44 (0) 207 138 3204 |
Competent Person's Statement
Mr Maxwell Donald Tuesley, BSc (Hons) Economic Geology, a member of the Australasian Institute of Mining and Metallurgy (No 111470 and employee of the Company, has compiled, read and approved the technical disclosure in relation to the projects in this regulatory announcement in accordance with the AIM Rules - Note for Mining and Oil & Gas Companies.
Forward Looking Statements
Certain statements relating to the estimated or expected future production, operating results, cash flows and costs and financial condition of Metals Explorations, planned work at the Company's projects and the expected results of such work contained herein are forward-looking statementswhich are based on current expectations, estimates and projections about the potential returns of the Group, industry and markets in which the Group operates in, the Directors’ beliefs and assumptions made by the Directors. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by words such as the following: “expects”, “plans”, “anticipates”, “forecasts”, “believes”, “intends”, “estimates”, “projects”, “assumes”, “potential” or variations of such words and similar expressions. Forward-looking statements also include reference to events or conditions that will, would, may, could or should occur. Information concerning exploration results and mineral reserve and resource estimates may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed.
These statements are not guarantees of future performance or the ability to identify and consummate investments and involve certain risks, uncertainties and assumptions that are difficult to predict, qualify or quantify. Among the factors that could cause actual results or projections to differ materially include, without limitation: uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from logistical, technical or other factors; the possibility that results of work will not fulfil projections/expectations and realize the perceived potential of the Company's projects; uncertainties involved in the interpretation of drilling results and other tests and the estimation of gold reserves and resources; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of environmental issues at the Company's projects; the possibility of cost overruns or unanticipated expenses in work programs; the need to obtain permits and comply with environmental laws and regulations and other government requirements; fluctuations in the price of gold and other risks and uncertainties.
The Company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to any forward looking statements contained herein to reflect any change in the Group’s expectations with regard thereto or any change in events, conditions or circumstances on which any such statements are based unless required to do so by applicable law or the, AIM Rules.
CONDENSED CONSOLIDATED STATEMENT OF TOTAL COMPREHENSIVE INCOME for the six months ended 30 June 2026
| | Notes | 6 month period ended 30 June 2026 (unaudited) | | 6 month period ended 30 June 2025 (unaudited) | | Year ended 31 December 2025 (audited) |
| | | US$ | | US$ | | US$ |
| Continuing Operations | | | | | | |
| Revenue | | 99,954,497 | | 118,948,548 | | 208,413,419 |
| Cost of sales | | (62,535,110) | | (83,275,388) | | (135,356,661) |
| | | | | | | |
| Gross profit | | 37,419,387 | | 35,673,160 | | 73,056,758 |
| Administrative expenses | | (7,254,825) | | (6,529,654) | | (11,495,137) |
| | | | | | | |
| Operating profit | | 30,164,562 | | 29,143,506 | | 61,561,621 |
| | | | | | | |
| Impairment (loss)/gain | | (829,667) | | 4,937,917 | | 908,828 |
| Other income/expenses | 6/7 | (1,734,714) | | (18,798,365) | | (22,798,678) |
| Provision for (loss)/gain on derivatives | | (916,937) | | 1,535,541 | | 5,453,412 |
| Share of profit/(loss) of associates | | 47,632 | | (3,458) | | (5,158) |
| Profit before tax | | 26,730,876 | | 16,815,141 | | 45,120,025 |
| Tax expense | | 4,599,245 | | 309,234 | | 16,502,303 |
| Profit for the period | | 22,131,631 | | 16,505,907 | | 28,617,722 |
| Non-controlling interest | | 41,787 | | 9,301 | | 274,217 |
| Profit for the period attributable to equity holders of the parent | | 22,173,418 | | 16,515,208 | | 28,891,939 |
| | | | | | | |
| Other comprehensive income: | | | | | | |
| Items that may be re-classified subsequently to profit or loss: | | | | | | |
| Exchange differences on translating foreign operations | | 97,874 | | (646,177) | | (1,560,023) |
| Items that will not be re-classified subsequently****to profit or loss: | | | | | | |
| Re-measurement of pension liabilities | | - | | - | | (53,375) |
| Total comprehensive profit for the period attributable to equity holders of the parent | | 22,271,292 | | 15,869,031 | | 27,278,541 |
| | | | | | | |
| Earnings per voting share: | 9 | | | | | |