JLP
Fiscal year ends June Quarters are offset from the calendar — Q1 is Jul–Sep

Jubilee Metals Group is an integrated copper mining and processing company focused on building a mine-to-metals business in Zambia. The company operates a three-pillar strategy comprising third-party copper feedstock processing, copper refining, and mining and exploration. Its key assets include the Roan Concentrator, which processes third-party feed, waste, and tailings to produce copper concentrates; the Sable Refinery, which refines copper-bearing material into copper cathode; and the Molefe mining asset, which provides Jubilee-controlled ore to the refinery. The group serves the global copper market by producing copper concentrates and cathode, utilizing infrastructure that allows for the flexible processing of mined ore, secondary materials, and remnant mining residues. Jubilee Metals Group is listed on the London Stock Exchange’s AIM and the Johannesburg Stock Exchange’s AltX.

Summarised from the company's own disclosures, fiscal year ended Oct 2026

Industry Copper Homepage jubileemetalsgroup.com
Sector Basic Materials IR page —
Tags
copper mining, copper refining, metals recovery, tailings processing, copper concentrates, copper cathode, third-party feedstock processing, resource exploration, Roan Concentrator, Sable Refinery, Molefe
Press page —

Metrics

Valuation  
Market cap £ 97.54M
Market cap (USD) $ 128.736M
P/E 30.61
PEG —
P/BV 1.65
P/S 0.69
P/OCF —
P/FCF —
Dividend yield —
Turnover / mcap —
Returns  
ROE —
ROI —
ROIC —
Profit margin —
Growth  
Revenue growing Yes
Profits growing No
Revenue up 3y Yes
Revenue up 5y Yes
Earnings growth 3y (net profit CAGR) -10.7%
Quality  
Profitable Yes
Margin expanding No
Buying back stock No
Diluting (TTM) —
Debt/Equity —
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 0
Quality score 18.2%
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2024 FY 2023 FY 2022 FY 2021 FY 2020 FY 2019 FY 2018 FY 2017 FY 2016 FY 2014 FY 2013 FY 2012 FY 2011 FY 2009
Revenue — 141.929M 140.007M 132.845M 54.775M 23.586M 139 — — 4.044M 4.751M 725K — —
Net profit — 12.97M 18.372M 40.231M 18.229M 6.976M -2.403M -10.573M — -5.554M -7.473M -7.88M — —

Figure FY 2024 FY 2023 FY 2022 FY 2021 FY 2020 FY 2019 FY 2018 FY 2017 FY 2016 FY 2014 FY 2013 FY 2012 FY 2011 FY 2009
Share price — 0.15 0.15 — — — — — — — — — — —
P/S — 2.84 2.76 — — — — — — — — — — —

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

Molefe Mine Update Bull 2 Bear 0 Product/operations

Jubilee, the integrated copper producer and resource developer in Zambia, is pleased to report the results of the completed Phase 2 drilling programme at its Molefe Mine. Phase 2 followed the initial infill drilling and trenching programme (Phase 1) and was designed to test the eastern continuation of the mineralised structure and identify suitable locations for planned mine infrastructure (including modular processing plants, waste rock dump area and roads). The drilling was undertaken by Galileo Resources plc (AIM: GLR) (Galileo) under the co-operation and project development agreement announced on 28 November 2025.

Highlights

  • 9 holes totalling 552.6m tested continuity and mineralisation tenor with the balance of 14 holes totalling 1,298.9m being drilled for purposes of identifying locations for infrastructure that avoided sterilising potential future copper mining areas (condemnation)

  • Peak intercepts included Hole MNKDD021 which returned 2.97% TCu (total copper) over 3.10m, Hole MNKDD027 which returned 1.24% TCu over 10.5m and Hole MNKDD029 which returned 1.51% TCu over 12.5m

  • Drilling confirmed continuity and increased the strike length of mineralisation by approximately 380m in an easterly direction from 930m to an updated estimate of 1,310m

  • A mine development plan and schedule have been provided to Jubilee for consideration supported by the condemnation drilling

  • An updated in-house developed mine schedule has been provided to Jubilee targeting an oxide copper reef of approximately 1 million tonnes at grades of at least 1.30% TCu, including approximately 240 000 tonnes at 1.45% TCu in the immediately targeted pits 2 and 3. The updated mine schedule incorporates both the additional drilling results as well as in-pit sampling of more than 400 samples from the operating mine. The drilling results together with the in-pit sampling is specifically focussed at supporting the mining schedule and does not represent any resource estimate under any standard

  • The eastern continuation has not been included in the in-house resource estimate. The updated resource calculation, incorporating the Phase 2 drilling results, is targeted for completion by the end of CY2026

  • Improved understanding of the orientation and projected continuation of the mineralised structure, supporting the exploration rationale for additional properties secured by Jubilee in the surrounding area and in refining future exploration targets

  • The current drilling programme and in-house resource estimate cover only approximately 400 hectares, compared with more than 12,200 hectares of exploration ground to the east alone (less than 5%), highlighting the scale of Jubilee and its partners’ wider exploration opportunity

Statement from Leon Coetzer, Jubilee CEO:

“The Phase 2 drilling results at Molefe are encouraging and confirm the further expansion potential of the Molefe mining operations, with multiple significant copper intersections, including both high-grade and wider mineralised intercepts. Of note is the shallow depth at which the copper intersections are recorded.

These results will now be incorporated into the Molefe Mine’s geological model and mine planning as the partners continue to evaluate the wider resource potential at Molefe and advance its development as a core component of Jubilee’s integrated mine-to-metals strategy in Zambia.

Importantly, the current drilling programme and in-house resource estimate cover only approximately 400 hectares, compared with more than 12,200 hectares of exploration ground to the east alone. The tonnes referred to in this announcement therefore represent only a small part of the broader exploration opportunity. Our ambition is to identify and develop multiple Molefe-style mining operations across this expanded area, supporting Jubilee’s transition into a resource-backed mining company underpinned by its established processing capability.”

Molefe Mine – Phase 2 drilling programme

The Phase 2 drilling programme at the Molefe Mine forms part of Jubilee's ongoing work to further define the Molefe orebody and assess the potential extension of mineralisation beyond the areas incorporated into the current mine plan.

The Phase 2 drilling programme returned encouraging copper intersections across multiple boreholes, including a high-grade intercept of 3.10 metres at 2.97% total copper (TCu). Wider mineralised intersections included 12.5 metres at 1.51% TCu, 10.5 metres at 1.24% TCu and 13.0 metres at 0.87% TCu. Future drill campaigns will target narrower drill spacing in identified mining areas to improve the accuracy of the mine plan and may include new licence areas secured by Jubilee.

Table 1: Highlighted Drill Results – Mineralised Intercepts Molefe Mine

| Borehole ID | From (m) | To (m) | Mineralised Width (m)1 | Grade (TCu %)2 |

| MNKDD021 | 57.6 | 60.7 | 3.10 | 2.97 |

| MNKDD024 | 22.0 | 35.0 | 13.0 | 0.87 |

| MNKDD025 | 64.0 | 71.0 | 7.00 | 0.57 |

| MNKDD026 | 18.3 | 26.0 | 7.70 | 0.45 |

| MNKDD027 | 12.5 | 23.0 | 10.5 | 1.24 |

| MNKDD029 | 26.4 | 38.9 | 12.5 | 1.51 |

| MNKDD030 | 49.0 | 54.0 | 5.00 | 0.42 |

| MNKDD033 | 9.30 | 20.4 | 11.1 | 0.84 |

1: Minimum mineralised width for estimation purposes of 3.0m

2: Cut-off grade 0.4% TCu (total copper).

The results will be incorporated into Jubilee's geological model and ongoing mine planning as the Company continues to expand the Molefe Mine and evaluate its wider resource potential. The drilling programme forms part of Jubilee's broader strategy to develop Molefe as a key mining operation supplying its established processing footprint in Zambia.

Table 2: Continuity and Extension Drilling – Molefe

| Hole ID | EOH | From (m) | To (m) | Width (m) | Grade (% TCu) |

| MNKDD021 | 100.1 | 57.6 | 60.7 | 3.10 | 2.97 |

| MNKDD024 | 52 | 22 | 35 | 13.00 | 0.87 |

| MNKDD025 | 86 | 64 | 71 | 7.00 | 0.57 |

| MNKDD026 | 55 | 18.3 | 26 | 7.70 | 0.45 |

| And | | 29.05 | 36 | 6.95 | 0.74 |

| MNKDD027 | 54.8 | 12.5 | 23 | 10.50 | 1.24 |

| MNKDD029 | 56.7 | 26.4 | 38.9 | 12.50 | 1.51 |

| MNKDD030 | 85.4 | 49 | 54 | 5.00 | 0.42 |

| MNKDD033 | 62.6 | 9.3 | 20.4 | 11.10 | 0.84 |

1: EOH refers to the final drilled depth of the hole and does not represent the width of mineralisation.

Table 3: Condemnation Drilling – Molefe

| Hole ID | EOH |

| MNKDD018 | 50.1 |

| MNKDD019 | 100.1 |

| MNKDD020 | 100.1 |

| MNKDD022 | 119.1 |

| MNKDD023 | 70 |

| MNKDD028 | 62 |

| MNKDD031 | 60 |

| MNKDD032 | 44.2 |

| MNKDD034 | 83.3 |

| MNKDD035 | 61.3 |

| MNKDD036 | 100.2 |

| MNKDD037 | 206.2 |

| MNKDD038 | 92.1 |

| MNKDD039 | 150.2 |

The drilling has improved the understanding of the orientation and projected continuation of the mineralised structure. This supports the exploration rationale for additional properties secured by Jubilee in the surrounding area and will assist in refining future exploration targets. Further exploration is required to determine whether the Molefe mineralisation extends onto these properties.

Qualified Person

Galileo has been appointed, under the partnership agreement for the Molefe Mine project, as the responsible party for the development of the mine plan and resource definition and as such has appointed Colin Bird as the qualified person.

The technical information contained in this announcement has been reviewed, verified, and approved by Colin Bird, C. Eng, FIMMM, South African and UK Certified Mine Manager and Director of Galileo, with more than 40 years’ experience mainly in hard rock mining.

29 October 2026

Update on Large Waste Project Disposal Bull 5 Bear 0 M&A

Jubilee, the integrated copper producer and resource developer in Zambia, is pleased to provide an update on the disposal of its Large Waste Project (LWP).

The Company expects to announce the drilling results from the ongoing Phase 2 drilling programme at the Molefe Mine in the next few days.

Highlights

  • Legal due diligence for the disposal of the LWP for a total consideration of approximately US$35 million (Consideration) completed, with payment of a US$2.25 million deposit to follow in the next few days

  • 45-day period commences to complete technical due diligence and finalise transaction documentation

  • The Consideration together with remaining cash proceeds from the sale of the South African operations of US$65 million offer substantial cash inflows of up to US$100 million, strengthening the Company's balance sheet and offering accelerated investment into the continued expansion of the Zambian operations

Statement from Leon Coetzer, Jubilee CEO:

“The successful completion of the legal due diligence represents an important milestone in progressing the disposal of the Large Waste Project. It triggers the payment of the US$2.25 million deposit and the commencement of the 45-day period to complete both the technical due diligence and the transactional documents which on completion would trigger the next payment due in December 2026.

In addition, the next instalment from the sale of the South African operations of approximately US$15 million becomes due during early January 2027. The disposal remains firmly aligned with our strategy to recycle capital into the accelerated growth of our existing Zambian copper operations, where we can leverage our established operating and processing footprint to target stronger returns.”

Disposal of the Large Waste Project

The legal due diligence in respect of the proposed disposal of the LWP has now been completed. The Company expects the US$2.25 million deposit to be paid within the next few days. Based on the terms of the binding heads of terms, a further 45-day period is offered to complete the further due diligence mainly focussing on the technical aspects of the material as well as the conclusion of the final transactional documentation. If completed successfully within this period, the consideration of $35 million will be settled over a 3-year period with the first instalment due in December 2026. The transaction remains subject to the completion of the final due diligence and definitive documentation and the satisfaction or waiver of conditions precedent normal for a transaction of this nature.

The transaction represents a further step in Jubilee's strategy to progressively de-risk its growth portfolio and prioritise capital allocation towards the expansion of its existing Zambian copper operations. The monetisation of the LWP enables Jubilee to redirect capital towards opportunities capable of generating stronger returns by leveraging the Company's established mining and processing footprint in Zambia, including the continued expansion of the Molefe Mine.

8 October 2026

FY2026 Production and Operational Update Bull 4 Bear 0 Product/operations

Jubilee, the integrated copper producer and resource developer in Zambia, today provides a production and operational update for the year ended 30 June 2026 (FY2026).

Jubilee's copper growth strategy is underpinned by an expanding portfolio of mining and processing operations supplying copper feed to the Company's Sable Refinery. The continued expansion of Jubilee's copper resource and mining footprint is central to the Company's transition from predominantly processing and refining third-party material towards a vertically integrated, mine-to-metals copper business.

Highlights

  • Combined copper production prior to refining from the Roan operations and Molefe Mine totalled 3 739t of copper (Cu) for FY2026, an increase of 225.0% from 1 149t in FY2025 consisting of:

o Combined Roan production from all three products of 2 823t of Cu in concentrate for FY2026, a year-on-year increase of 145.5% from FY2025

o Combined Molefe mine production of 916t of Cu in ROM in both lower-grade (LG) material, stockpiled at the mine site, and high-grade (HG) material transported to Sable. Production at Molefe commenced in September 2025

  • Combined Cu in concentrate and ROM, delivered to Sable during FY2026 for refining reached 1 342t of contained Cu, an increase of 1 497.6%

  • Combined cathode and copper sulphide concentrate produced for sale reached 2 120t of Cu in FY2026, a year-on-year increase of 1.3%

Third party ROM processor – Roan Operations

  • Production at Roan consisted of:

o Cu in oxide concentrate increasing by more than a 1 000% on the previous year to 997t

o Cu in sulphide concentrate decreased by 14.4% to 913t reflecting the increased treatment of oxide ores during the period and demonstrating Roan’s flexibility to process varying ore types

o Cu in oxide concentrate fines production, commencing during FY2026, of 913t of Cu. This built-up stock will now be processed through the newly commissioned fines concentrate dewatering circuit before being transported to Sable Refinery for further processing

  • The more than doubling of Cu units produced was achieved despite an extended annual maintenance period during Q4 FY2026 to allow for the successful installation and commissioning of the new concentrate dewatering circuit

  • Roan has now reached stable operational output (stable state) with a forecasted operational output for FY2027 of between 2 850t and 3 150t of Cu

Third-party processing has provided Jubilee with an important platform from which to establish and grow copper production in Zambia. The Company's expanding mining footprint is intended to complement this platform by securing a growing, long-term supply of Jubilee-controlled copper feed for processing and refining through Sable. Roan has matured into a stable operating unit, delivering consistent operational performance and a significant increase in copper production. Roan represents the first established source of copper concentrate supplying Sable, with the Molefe Mine and Project G targeted to become the next operational feed sources as Jubilee progressively builds the baseload supply required to support its refining capacity.

Refining Operation – Sable

  • Cathode production at Sable for FY2026 increased by 17.5% to 1 207t

Sable continues to achieve its targeted refining efficiency and maintain the expected copper metal conversion rate from received concentrate and ROM feed received. During Q4 FY2026, domestic acid availability reduced significantly resulting in tighter supply conditions as well as the cost increasing by in excess of 200%, whilst diesel costs increased by 90%. These combined have had a marked impact on production at Sable and also lead to the growing number of forced temporary closures of certain metal processors within our area in Zambia. Jubilee has been able to partially mitigate this impact through the flexibility of its operational model. Sable’s production relies on the guidance provided by Roan and Molefe achieving its project milestones.

Mining Operations - Molefe Mine

  • Contained Cu units in HG ROM dispatched to Sable reached 345t, which together with Cu units produced at Roan reached 3 168t up from 1 150t in FY2025, a year-on -year increase of 175.5%

  • A further 571t of contained Cu in LG ROM was stockpiled at site for future processing

  • Expanded second phase resource drilling campaign completed with 1 801 meters drilled

  • A further 371 in-pit samples were processed as part of the resource definition program

  • Updated mine plan for the Molefe Mine project is targeting 1.6Mt of pre-stripping to expand the open-pit of which 456 511t were stripped during the period. The remaining pre-stripping will be executed in parallel with the mining of the ROM material

The Company expects to release the results from the phase 2 drilling program over the coming two weeks. Molefe Mine represents Jubilee's first owned and operated mining operation and an important step in establishing a sustainable supply of Jubilee-controlled copper feed to Sable.

Following the expanded resource drilling campaign, the Molefe mine plan has been updated to incorporate an extended pre-stripping programme designed to enlarge the open-pit mining area and support the progressive increase in HG ROM production towards the project's targeted rate of 10 000tpm at a grade of 1.45% Cu.

Key milestones under the updated project plan include:

  • Increasing the HG ROM mining rate to approximately 7 500tpm during October 2026, supported by the ongoing pre-strip programme

  • This operating phase will be used to demonstrate the sustainability of the HG Cu grade profile at the increased mining rate and confirm the metallurgical performance of the ROM material through Sable

  • Subject to successful and sustained performance at approximately 7 500tpm, progressing towards the project target of 10 000tpm of ROM, currently targeted for before the end of CY2026

  • Installation of the in-line bulk ore sorting facility at Molefe Mine to more accurately separate the HG and LG ROM as part of the phased implementation of the on-site processing solution

  • Bulk ore sorting trials have been completed during Q4 FY2026 with completed results expected shortly to confirm final designs and installation timelines

  • Commencement of exploratory aero magnetic surveys of the vast exploration areas to the east of Molefe accounting for near 15 000ha, dwarfing the current 400ha of Molefe Mine, with visible multiple potential outcrops

Current indications from the drilling results suggest Molefe holds the potential to deliver approximately 1 740tpa of contained Cu in HG ROM to Sable which excludes the LG ROM being stockpiled for future processing at site. The Company’s resource JV partner tasked with the development of the resource review, is targeting the release of an updated resource review by the end of CY2026.

Project G

  • Project G has similarities to the early status of the Molefe Mine as an informally mined open-pit operation that has exposed the copper reef with multiple outcrop zones

  • Bulk trial of Project ROM has been tested at Sable to confirm expected metallurgical performance parameters

  • Multiple nearby copper outcrop operations offering partnership opportunities for expansion

  • Negotiations to form a joint venture with nearby partners are ongoing

Beyond Molefe Mine, Jubilee is progressing the development of its broader mining portfolio to establish additional sources of Jubilee-controlled feed for Sable. Project G represents the Company's next targeted mining project and is expected to advance following the Molefe ramp-up programme, with development of the Project G zone currently targeted to commence from February 2027. Project G forms part of a second prospective mining cluster which, similar to the Molefe area, offers the potential to establish multiple open-pit mining operations through a combination of direct ownership and strategic partnerships.

Disposal Program of Assets as part of the strategic rationalisation of the Group’s portfolio

  • Post the period under review, in August 2026, the Company announced the execution of a Binding Heads of Terms for the sale of the Large Waste Project (LWP) for a consideration of US$35 million with an option for accelerated settlement for a reduced consideration of US$30 million

  • The due diligence is progressing and is expected to conclude within the coming week which if successful, releases a deposit payment of US$2.25 million to secure an exclusivity period to conclude final transactional documentation

Following the disposal of the LWP, the Group has refined its three-pillar copper strategy to reflect the evolution of its Zambian asset portfolio and its increasing focus on Jubilee-controlled mining and exploration opportunities as the Group progresses from a predominantly third-party processor towards a more integrated mine-to-metals copper business.

Update on Tjate

Jubilee’s Tjate platinum group metals project was retained following the sale of the South African business. The Company has received expressions of interest from various companies and is reviewing these interests as part of its strategic review of the asset.

Production Performance

The table below presents the production performance of Roan, Molefe Mine and Sable for the financial year ending 30 June 2026.

| PRODUCTION PERFORMANCE | | Q1 FY26 | Q2 FY26 | Q3 FY26 | Q4 FY26 | FY2026 | FY2025 | % change |

| Roan | | | | | | | | |

| Cu in oxide concentrates | tonnes | 270 | 342 | 219 | 168 | 997 | 84 | 1 086.9% |

| Cu in sulphide concentrates | tonnes | 639 | 70 | 113 | 91 | 913 | 1 066 | (14.4%) |

| Cu in oxide concentrate fines – held in-stock prior to new concentrate dewatering process | tonnes | 152 | 330 | 278 | 153 | 913 | - | - |

| Roan total production* | tonnes | 1 061 | 742 | 610 | 412 | 2 823 | 1 150 | 145.5% |

| Molefe Mine | | | | | | | | |

| Dispatched to Sable | DMT | 881 | 8 249 | 9 342 | 2 992** | 21 464 | - | - |

| Total Cu units dispatched to Sable | tonnes | 13 | 165 | 133 | 35 | 345 | - | - |

| Production of copper containing material stockpiled at site | DMT | 38 648 | 143 242 | 66 681 | 207 940 | 456 511 | - | - |

| Total Cu units in LG material stockpiled at site*** | tonnes | 48 | 179 | 83 | 260 | 571 | - | - |

| Total Cu units production from operations | tonnes | 1 121 | 1 086 | 826 | 706 | 3 739 | 1 150 | 225.0% |

| Sable | | | | | | | | |

| Cu cathodes | tonnes | 217 | 379 | 361 | 250 | 1 207 | 1 027 | 17.5% |

| | | | | | | | | |

| Final products produced for sale**** | tonnes | 856 | 449 | 474 | 341 | 2 120 | 2 092 | 1.3% |

  • Cu tonnes produced at Roan comprises three streams:

  • Cu in oxide concentrate that is further refined to cathode at Sable Refinery

  • Cu in sulphide concentrate which is sold directly into the market

  • Cu in oxide concentrate fines which are currently stockpiled and processed by the recently commissioned dewatering facility at Roan, before being delivered to Sable Refinery for further refining. Production commenced in August 2025

** Main focus was pre stripping to expand the open-pit rather than ore deliveries to Sable. Production commenced in September 2025

*** Based on an assumed 25% LG content and applying an estimated copper grade of 0.5%

**** Final products produced for sale include Cu cathode produced at Sable Refinery and Cu sulphide concentrate produced at Roan and excludes all Cu units in oxide concentrate fines stockpiled at Roan

Further detailed operational review

The Group has refined its three-pillar copper strategy to reflect the evolution of its Zambian asset portfolio and its increasing focus on Jubilee-controlled mining and exploration opportunities. The first pillar remains focused on the processing of third-party copper feedstock, principally through the Roan Concentrator. The second pillar is centred on the Sable Refinery as the Group’s key refining platform. The third pillar now comprises Jubilee’s mining assets and exploration activities, replacing the previous focus on large-scale surface waste and tailings projects. This evolution reflects the strategic rationalisation of the Group’s portfolio following the LWP disposal and the increasing importance of Jubilee-controlled mining assets as the Group progresses from a predominantly third-party processor towards a more integrated mine-to-metals copper business.

Pillar 1 – Processing of third-party copper feedstock: Roan

Roan continued to demonstrate improved operational performance during FY2026, with total Cu units produced increasing by 145.5% to 2 823t, compared with 1 149t in FY2025. This comprised 997t of Cu in oxide concentrates delivered to Sable for further refining, 913t of Cu in sulphide concentrates for direct sale and 913t of Cu contained in oxide concentrate fines.

The increase in production at Roan resulted in a build-up of in-process copper stocks, principally in the form of oxide concentrate fines. The successful commissioning of the new fines concentrate dewatering system provides the capacity to progressively reduce these stocks and convert the contained copper into material suitable for further processing at the Sable Refinery.

The potential introduction of a DMS circuit remains under review. Importantly, the Company's current production expectations for Roan are based on the existing operating configuration and do not depend on the introduction of the DMS circuit.

Pillar 2 – Refining: Sable Refinery

Sable remains the central refining platform within Jubilee's Zambian copper strategy, providing the infrastructure through which the Group can progressively integrate copper feed from both third-party processing and its expanding portfolio of Jubilee-controlled mining operations.

During FY2026, Sable continued to receive oxide copper concentrate produced from Roan alongside increasing volumes of Jubilee-controlled material from Molefe. As the Company's mining portfolio develops, Sable is expected to receive feed from a growing number of sources, including Molefe and, in due course, Project G and other mining and exploration opportunities.

Pillar 3 – Mining and exploration: Molefe and Project G

Jubilee continued to advance the development of its mining and exploration portfolio during FY2026, focused on establishing a growing and sustainable supply of Jubilee-controlled copper feed for its processing and refining infrastructure.

At Molefe, 456 511t of copper reef material were mined during FY2026, with 21 464t dispatched to the Sable Refinery. Mining of copper reef material was temporarily curtailed during Q4 FY2026 as the Company prioritised the accelerated pre-stripping and pit development programme required to integrate Pits 2 and 3 into a single enlarged open-pit operation.

In parallel, Jubilee continues to advance its exploration and resource definition programme at Molefe, with the objective of establishing a JORC-compliant resource during Q4 CY2026 and progressively expanding the resource base underpinning the Company's mining operations. The Company expects to release the results of the expanded drilling campaign within the coming two weeks.

Beyond Molefe, Project G represents Jubilee's next targeted mining development and forms part of the Company's strategy to establish additional clusters of open-pit mining operations capable of supplying Sable. Development of the Project G zone is currently targeted to commence from February 2027.

Production guidance and outlook

Jubilee is adopting a disciplined approach to production guidance, with forecasts based on demonstrated, stable operating performance (stable state) rather than assumptions relating to project ramp-up. The Company's growing portfolio of copper feed sources is at different stages of operational maturity. Each production source will therefore be incorporated into formal production guidance once it has demonstrated the required level of operating stability and predictability.

Of these production sources, Roan has reached the level of operating stability required to support forward guidance. Roan is targeting processing rates of between 25 000 and 30 000tpm at an expected copper feed grade of approximately 1.5% to 1.6%, comprising sulphide, oxide and fines material. On this basis, Roan is expected to deliver approximately 2 850 to 3 150tpa of contained Cu units. This guidance is based on total copper unit production and is not dependent on the potential introduction of the DMS circuit, which remains under review.

Molefe remains in its planned ramp-up and operational proving phase as the open pit continues to be expanded and pre-stripped. The current project target is to increase ROM material delivered to Sable to approximately 7 000–7 500tpm before progressing towards 10 000tpm.

The initial 7 000–7 500tpm operating level will be used to demonstrate the sustainability of the key operating assumptions underpinning the planned expansion, including achieved copper grade, recoveries, throughput and acid consumption. Subject to these parameters being demonstrated on a sustained basis, Molefe will progress towards its project target of 10 000tpm of ROM. The 10 000tpm level therefore remains a project target rather than production guidance. Once Molefe has demonstrated stable operation at the targeted production rate for a sustained period (stable state), currently anticipated to be before the end of the CY2026, the Company expects to be in a position to incorporate Molefe into formal production guidance.

Project G will similarly be incorporated into formal production guidance once development has advanced sufficiently and the operation has demonstrated the required level of stable and predictable performance.

This approach establishes a clear progression from project target to production guidance as each operation demonstrates the required level of operating stability, while allowing Jubilee to progressively build guidance around its expanding portfolio of integrated copper production sources.

14 September 2026

Prompts

Jubilee Metals Group PLC (ticker JLP), listed in United Kingdom.

ETFs Holding Jubilee Metals Group PLC

ETF Weight in ETF Shares Market value As of
AVDE 0.00% 3,400,713 $ 68.575K Nov 16, 2026
AVSD 0.00% 11,660 $ 235.13 Nov 16, 2026
AVDS 0.00% 270,316 $ 5,450.87 Nov 16, 2026