|
Antofagasta plc is a Chile-based copper mining group with interests in transport. The company operates four copper mines in Chile, including the flagship Los Pelambres in the Coquimbo Region and operations in the Antofagasta Region, producing copper and significant volumes of by-products. Its transport division, known as Ferrocarril de Antofagasta a Bolivia (FCAB), provides rail and road cargo services to the mining industry in northern Chile. The group focuses on expanding its mineral resource base through exploration activities in Chile and the Americas. Antofagasta plc was originally incorporated in 1888 as the Antofagasta (Chile) and Bolivia Railway Company Limited. Summarised from the company's own disclosures, fiscal year ended Dec 2025 |
Industry Copper | Homepage antofagasta.co.uk |
| Sector Basic Materials | IR page antofagasta.co.uk/investors | |
|
Tags
copper mining, by-product mining, rail transport, road transport, mining exploration, mining services, Los Pelambres, Antucoya, Centinela, Ferrocarril de Antofagasta a Bolivia, FCAB
|
Press page antofagasta.co.uk/investors/news |
Metrics
| Valuation | |
|---|---|
| Market cap | £ 16.782B |
| Market cap (USD) | $ 22.526B |
| P/E | 17.21 |
| PEG | — |
| P/BV | 1.41 |
| P/S | 2.46 |
| P/OCF | 6.92 |
| P/FCF | — |
| Dividend yield | — |
| Turnover / mcap | — |
| Returns | |
|---|---|
| ROE | 15.1% |
| ROI | 14.4% |
| ROIC | 15.3% |
| Profit margin | 24.0% |
| Growth | |
|---|---|
| Revenue growing | Yes |
| Profits growing | Yes |
| Revenue up 3y | Yes |
| Revenue up 5y | No |
| Earnings growth 3y (net profit CAGR) | -4.7% |
| Quality | |
|---|---|
| Profitable | Yes |
| Margin expanding | Yes |
| Buying back stock | No |
| Diluting (TTM) | No |
| Debt/Equity | — |
| Podcast bulls (TTM) | Sign up |
| Podcast bears (TTM) | Sign up |
| Podcast sentiment (TTM) | Sign up |
| Podcast sentiment % (TTM) | Sign up |
| News sentiment (TTM) | 0 |
| Quality score | 58.8% |
| Insiders | |
|---|---|
| Buys, 1w | Sign up |
| Buys, 1m | Sign up |
| Buys, 1y | Sign up |
| Sells, 1w | Sign up |
| Sells, 1m | Sign up |
| Sells, 1y | Sign up |
Sign up to see this company's insider trades
| Figure | FY 2025 | FY 2024 | FY 2023 | FY 2022 | FY 2021 | FY 2020 | FY 2019 | FY 2018 | FY 2017 | FY 2016 | FY 2015 | FY 2014 | FY 2013 | FY 2012 | FY 2011 | FY 2010 | FY 2009 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenue | 8.62B | 6.613B | 6.325B | 5.862B | 7.47B | 5.129B | 4.965B | 4.733B | 4.749B | 3.622B | 3.395B | 5.29B | 5.972B | 6.74B | 6.076B | 45.771B | 29.626B |
| Net profit | 2.071B | 1.316B | 1.299B | 1.955B | 2.235B | 893.9M | 843.1M | 880.3M | 1.198B | 214.3M | 701.7M | 850.7M | 1.24B | 1.734B | 2.13B | 18.207B | 11.199B |
Filed figures
Lines the statements and their notes report beside the headline figures, read from the filings' XBRL as filed (no restatement applied), with figures computed from one filing's own lines. Cash-flow lines carry their cash direction: an outflow is negative. Each period links to its filing; a figure's period, report date and tag are in its tooltip.
| Figure | Dec 2019 | Dec 2020 | Dec 2021 | Dec 2022 | Dec 2023 | Dec 2024 | Dec 2025 |
|---|---|---|---|---|---|---|---|
| Balance sheet detail | |||||||
| Trade receivables (USD) | — | 1.02B | 1.15B | 2.09B | 1.12B | 900M | 1.47B |
| ↳ YoY growth | +12.7% | +82.1% | -46.4% | -19.5% | +63.2% | ||
| ↳ 5y CAGR | +7.6% | ||||||
| Borrowings, current (USD) | — | 603M | 337M | — | — | — | — |
| Borrowings, non-current (USD) | — | 3.15B | 2.84B | — | — | — | — |
| Cash and deposits (USD) | 654M | 1.25B | 743M | 810M | 645M | 2.19B | 2.72B |
| Net debt (borrowings + leases - cash) (USD) | — | 2.51B | 2.43B | — | — | — | — |
| Cash flow detail | |||||||
| Operating cash flow (USD) | — | 2.06B | 3.67B | 1.88B | 2.33B | 2.29B | 3.07B |
| Purchases of property, plant and equipment (USD) | — | -1.31B | -1.77B | -1.88B | -2.13B | -2.41B | -3.68B |
| Dividends paid (cash effect) (USD) | — | -131M | -711M | -1.26B | -613M | -317M | -395M |
| Interest paid (cash effect) (USD) | — | -52.7M | -60.7M | -74.3M | -166M | -324M | -473M |
| Income taxes paid (cash effect) (USD) | — | -320M | -777M | -787M | -528M | -667M | -708M |
| Free cash flow (OCF - PPE - intangibles) (USD) | — | 753M | 1.9B | -2.3M | 204M | -130M | -613M |
| Income detail | |||||||
| Total comprehensive income (USD) | — | 881M | 2.26B | 1.96B | 1.41B | 1.31B | 2.13B |
| Comprehensive income to owners (USD) | — | 498M | 1.31B | 1.54B | 938M | 828M | 1.38B |
| Reported | Apr 27, 2022 | Apr 27, 2022 | Apr 27, 2022 | Mar 31, 2023 | Mar 28, 2024 | May 8, 2025 | Mar 26, 2026 |
Sign up to see institutional holdings
Sign UpPodcast Mentions
Sign up to see podcast mentions and sentiment
Sign UpResults, director/PDMR dealings and voting-rights totals announced to the FCA's National Storage Mechanism, newest first. The link opens the announcement on the NSM. Press releases from the company's own website, newest first.
Find all of our events here in one place.
Date Event
-
27.01.27
-
Page 1 of 1
Sitemap
Stay informed
Receive our news alerts and latest news and events.
2026 Antofagasta plc. By emperor
Our use of cookies
We use essential cookies to make our site work. We also set analytics cookies to help us improve it. We won't set other optional cookies unless you enable them.
AcceptRejectSettings
7% INCREASE IN QUARTERLY COPPER PRODUCTION
2027 PRODUCTION GUIDANCE OF 630,000–690,000 TONNES OF COPPER
Antofagasta plc CEO, Iván Arriagada, said: “During the quarter, we delivered a 7% increase in production to 151,900 tonnes, with Los Pelambres completing the drawdown of inventories accumulated during the prior quarter, and demonstrating resilience following the severe weather event in July. Looking ahead, we have announced 2027 copper production guidance of 630,000–690,000 tonnes, reflecting higher grades at Los Pelambres and lower grades at Centinela Concentrates.
“Construction activities across our major growth projects at Centinela and Los Pelambres are progressing well, and we have entered the final phases of each schedule, ahead of construction and commissioning activities completing in 2027. These projects will deliver significant growth and strengthen the resilience of our portfolio, and we remain focused on completing each project in line with expectations.
“The copper market continues to demonstrate strong fundamentals. Looking ahead, the combination of continued investment in energy infrastructure and digitalisation, together with supply constraints, provides a supportive backdrop, helping to reinforce the long-term outlook.”
| ** GROUP PRODUCTION AND CASH COSTS** | Year to date | Q3 | Q2 | ||||
| 2026 | 2025 | % | 2026 | 2025 | % | ||
| Copper production | Kt | 436.9 | 476.6 | (8.3) | 151.9 | 142.0 | 7.0 |
| Copper sales | Kt | 438.5 | 465.3 | (5.8) | 170.7 | 130.8 | 30.5 |
| Gold production | koz | 137.1 | 145.0 | (5.4) | 44.3 | 46.3 | (4.3) |
| Molybdenum production | Kt | 9.0 | 11.4 | (21.1) | 2.9 | 3.1 | (6.5) |
| Cash costs before by-product credits (1) | $/lb | 2.81 | 2.35 | 19.6 | 2.73 | 2.94 | (7.1) |
| Net cash costs (1) | $/lb | 1.28 | 1.24 | 3.2 | 1.38 | 1.36 | 1.5 |
(1) Cash costs are a non-GAAP measure used by the mining industry to express the cost of production in US dollars per pound of copper produced.
HIGHLIGHTS
PRODUCTION
- Copper production in Q3 2026 was 151,900 tonnes, 7% higher on a quarter-on-quarter basis, reflecting higher output at Los Pelambres. Year-to-date copper production of 436,900 tonnes was 8% lower as a result of lower grades at Centinela Concentrates and lower recoveries at Centinela Cathodes.
- Gold production in Q3 2026 was 44,300 ounces, 4% lower than the previous quarter, following lower gold grades at Centinela Concentrates. Year-to-date gold production of 137,100 ounces was 5% lower as a result of lower gold grades at Centinela Concentrates and Los Pelambres.
- Molybdenum production in Q3 2026 was 2,900 tonnes, 6% below the level achieved in the prior period, with lower recoveries and grades at Los Pelambres, partially offset by higher grades recoveries at Centinela Concentrates. Year-to-date molybdenum production was 9,000 tonnes, 21% lower than the first nine months of 2025, with this movement principally related to lower molybdenum grades at Los Pelambres.
CASH COSTS
- Cash costs before by-product credits in Q3 2026 were $2.73/lb, representing a 7% decrease quarter-on-quarter, largely driven by higher production at Los Pelambres, the settlement of a three-year labour agreement at Centinela in the prior period and lower treatment charges. In the first nine months of 2026, cash costs before by-product credits were 20% higher at $2.81/lb, principally driven by the lower level of production and higher unit costs for key consumables, such as diesel and sulphuric acid
- By-product credits in Q3 2026 were $1.35/lb, representing a 15% decrease quarter-on-quarter, with lower output of by-products and lower realised prices for gold. By-product credits in the first nine months of 2026 were 38% higher year-on-year at $1.53/lb, following higher by-product realised prices, partially offset by lower by-product output.
- Net cash costs in Q3 2026 were $1.38/lb, 1% higher on a quarter-on-quarter basis, with lower underlying costs offset by lower by-product credits. Net cash costs in the first nine months of the year were 3% higher at $1.28/lb, with higher underlying cash costs largely offset by stronger by-product credits. As inflationary pressures persist across the global economy, the Group remains focused on supply chain resilience, disciplined cost control, operational excellence and project execution, alongside the benefit derived from by-product credits.
SAFETY AND SUSTAINABILITY
- The Group’s strong health and safety track record continued in the third quarter of 2026, with no fatalities and the Group-level lost-time injury frequency rate remaining below 1.0. The Group has now completed over 5 years without a fatal accident at any of its sites and projects.
GROWTH AND DEVELOPMENT PROJECTS
- Our major growth projects continue to advance towards the completion of commissioning next year, in line with the schedule for each project.
- Centinela Second Concentrator Project: Key activities during Q3 2026 included the initial operation of the primary crusher and the overland conveyor as part of pre-commissioning activities. During the period, the overland conveyor reached its nominal operating speed during testing and integrated no-load tests were completed across key elements of the material handling circuit.
- Los Pelambres’ Growth Enabling Projects:
- Concentrate pipeline: Progress continued on both the upper and lower sections of the pipeline route, including tunnel sections and civil works, as well as pipeline installation, lining and testing. In the lower section, the first hydraulic tests commenced, while preparations for hydrostatic testing continued in the upper section.
- Desalination plant expansion: Pre-commissioning activities continued across the main systems, in parallel with the installation of cabling in the electrical room and equipment in the pumping station.
- Zaldívar Water Supply: Camp construction works continued during Q3 2026, in parallel with the receipt of key pipeline construction materials and initial civil works associated with the high-voltage transmission line.
FULL YEAR (FY) 2026 GUIDANCE
- Production guidance for 2026 remains unchanged. Group copper production for the full year is expected to be in the range of 625,000–655,000 tonnes.
- Group-level guidance for cash costs before by-product credits has been raised to $2.60–2.70/lb, reflecting global diesel prices remaining at elevated levels. The previous guidance range was $2.40–2.60/lb.
- Net cash cost guidance remains unchanged at $1.15–1.35/lb.
- Capital expenditure guidance is unchanged at $3.4 billion.1
FY 2027 GUIDANCE
- Total Group copper production in 2027 is expected to be in the range of 630,000–690,000 tonnes, with higher copper grades at Los Pelambres, partially offset by lower copper grades at Centinela Concentrates.
- In line with previous years, the Group will provide its 2027 guidance for cash costs and capital expenditure in the Q4 2026 Production Report, due for release in January 2027.
CORPORATE UPDATE
- During the quarter, the Group concluded a three-year labour agreement with a workers’ union at Zaldívar. Following the end of the quarter, two workers’ unions at Centinela representing approximately 20% of the own employee workforce declared a strike, and negotiations are continuing.
- As previously announced, Non-Executive Director Juan Claro stepped down from the Board of Directors with effect from 31 August 2026.
1 Note: Capital expenditure guidance figure excludes Zaldívar, in line with previous years.
Investors – London
Juan Esteban Dides [email protected]
Robert Simmons [email protected]
Telephone +44 20 7808 0988
Media – London
Sara Powell
Ben Brewerton
Nick Hennis
Telephone +44 20 3727 1000
Media – Santiago
Pablo Orozco [email protected]
Carolina Pica [email protected]
Telephone +56 2 2798 7000
Sitemap
Stay informed
Receive our news alerts and latest news and events.
2026 Antofagasta plc. By emperor
Our use of cookies
We use essential cookies to make our site work. We also set analytics cookies to help us improve it. We won't set other optional cookies unless you enable them.
AcceptRejectSettings
Prompts
Click prompts to add them under the company line, click again to take one out, then copy the result into your AI chat. Shared by Asian Century Stocks and Uncovered Thai Stocks. Thank you.
ETFs Holding Antofagasta plc
Exchange-traded funds whose newest published daily portfolio holds one of the company's listings, largest weight first.
| ETF | Weight in ETF | Shares | Market value | As of |
|---|---|---|---|---|
| MEM | 2.03% | 22,217 | $ 1.126M | Jun 30, 2026 |
| EMC | 1.58% | 16,709 | $ 915K | Aug 31, 2026 |
| EMM | 1.05% | 11,121 | $ 608.996K | Aug 31, 2026 |
| CGIE | 0.64% | 389,994 | $ 15.673M | Nov 16, 2026 |
| FFGX | 0.63% | 6,974 | $ 343.541K | Jul 31, 2026 |
| FFDI | 0.55% | 2,182 | $ 107.486K | Jul 31, 2026 |
| CGDG | 0.55% | 814,763 | $ 32.743M | Nov 16, 2026 |
| FFLG | 0.38% | 45,818 | $ 2.257M | Jul 31, 2026 |
| DWMF | 0.38% | 2,535 | $ 128.527K | Jun 30, 2026 |
| CCNR | 0.33% | 29,046 | $ 1.431M | Jul 31, 2026 |
| UPAR | 0.24% | 3,175 | $ 127.643K | Nov 17, 2026 |
| RPAR | 0.17% | 22,795 | $ 916.417K | Nov 17, 2026 |
| DXIV | 0.10% | 5,462 | $ 232.599K | Nov 12, 2026 |
| NTSI | 0.09% | 9,184 | $ 465.637K | Jun 30, 2026 |
| DFSI | 0.08% | 21,345 | $ 908.977K | Nov 12, 2026 |
| DFIC | 0.07% | 268,092 | $ 11.417M | Nov 12, 2026 |
| AVDE | 0.07% | 323,583 | $ 12.794M | Nov 16, 2026 |
| AVSD | 0.07% | 6,710 | $ 265.305K | Nov 16, 2026 |
| DFAI | 0.06% | 255,033 | $ 10.861M | Nov 12, 2026 |
| DFAX | 0.05% | 127,949 | $ 5.449M | Nov 12, 2026 |
