MANAGEMENT’S DISCUSSION AND ANALYSIS FOR THE THREE AND SIX MONTHS ENDED JUNE 30, 2026 This Management’s Discussion and Analysis of the financial condition and results of operations (“MD&A”) for Torex Gold Resources Inc. (“Torex” or the “Company”) was…
MANAGEMENT’S DISCUSSION
AND ANALYSIS
FOR THE THREE AND SIX MONTHS ENDED JUNE 30, 2026
This Management’s Discussion and Analysis of the financial condition and results of operations (“MD&A”) for
Torex Gold Resources Inc. (“Torex” or the “Company”) was prepared as at August 6, 2026 and should be read in
conjunction with the Company’s unaudited condensed consolidated interim financial statements and related notes
for the three and six months ended June 30, 2026. It should also be read in conjunction with the Company’s
audited consolidated financial statements and annual MD&A for the year ended December 31, 2025. This MD&A
contains forward-looking statements that are subject to risks and uncertainties as discussed under “Cautionary
Notes”. This MD&A also includes the disclosure of certain non-GAAP financial measures. Refer to “Non-GAAP
Financial Performance Measures” which identifies the non-GAAP financial measures discussed in this MD&A for
further information, including a reconciliation to the comparable measures in accordance with IFRS Accounting
Standards (“IFRS”) as issued by the International Accounting Standards Board. All dollar figures included herein
are United States dollars (“U.S. dollar”) unless otherwise stated.
HIGHLIGHTS
•
Safety performance: The Company recorded no lost-time injuries during the first half of 2026 and maintained
a lost-time injury frequency (“LTIF”) of 0.00 per million hours worked for both employees and contractors on a
rolling 12-month basis.
•
Gold production: Production of 96,297 gold equivalent ounces ("oz AuEq") (YTD - 197,171 oz AuEq1),
including 69,278 oz of gold (YTD - 142,925 oz of gold). Mining rates remained strong during the second
quarter, averaging approximately 7,700 tpd at Media Luna and 3,000 tpd at ELG Underground. During the
quarter, throughput at the processing plant exceeded design levels, averaging 10,793 tpd. With higher grade
and higher gold recovery stopes expected to be mined through the second half of the year, production is
tracking to the midpoint of annual gold equivalent guidance of 420,000 to 470,000 oz AuEq1.
•
Gold sold: Gold equivalent ounces sold of 92,351 oz AuEq1 (YTD - 201,573 oz AuEq1) at a quarterly average
realized gold price3 of $4,525 per oz AuEq1 (YTD - $4,665 per oz AuEq1), contributing to revenue of
$406.9 million (YTD - $946.2 million). Revenue for the quarter includes a net loss of $7.0 million
(YTD - $31.0 million) for price adjustments on provisionally priced concentrate sales (a realized loss of $8.7
million on final sales settlements during the second quarter and an unrealized gain of $1.7 million on
provisional sales pending final settlement), primarily reflecting lower gold and silver prices in the quarter. In
the second quarter of 2026, the Company recognized a net derivative loss of $0.4 million (an unrealized loss
of $12.8 million and a realized gain of $12.4 million) on quotational period hedges entered into to mitigate
price risk on provisionally priced sales.
•
All-in sustaining costs3: Quarterly all-in sustaining costs of $2,459 per oz AuEq sold1 (YTD - $2,165 per oz
AuEq sold1) and all-in sustaining costs margin3 of $2,066 per oz AuEq sold1 (YTD - $2,500 per oz AuEq
sold1), implying an all-in sustaining costs margin3 of 46% (YTD - 54%). Cost of sales was $228.5 million or
$2,474 per oz AuEq sold1 in the quarter (YTD - $455.2 million or $2,258 per oz AuEq sold1). As a result of
continued strength in the Mexican peso, higher plant reagent costs associated with lower gold recoveries
(consumption rates and unit prices), higher mining volumes, an increase of $15.0 million to sustaining capital
expenditures reflecting the impact of a stronger Mexican peso on development costs and additional
equipment leases, and the impact of higher metal prices on royalties and land access payments, full year allin sustaining costs guidance has been revised to $2,000 to $2,100/oz AuEq1,2 sold from $1,750 to $1,850/oz
AuEq1,2 sold.
•
Strong profitability and adjusted EBITDA3: Reported quarterly net income of $113.8 million
(YTD - $321.3 million), or $1.22 per share (basic) (YTD - $3.41) and adjusted net earnings of $84.9 million
(YTD - $284.6 million), or $0.91 per share (basic) (YTD - $3.02). Generated EBITDA of $209.1 million
(YTD - $567.2 million) and adjusted EBITDA of $203.5 million (YTD - $562.1 million).
•
Cash flow generation: Net cash generated from operating activities totalled $167.6 million
(YTD - $377.4 million) and $165.1 million (YTD - $339.3 million) before changes in non-cash operating
working capital. Net cash generated from operating activities included income taxes paid of $52.5 million
(YTD - $193.2 million) and $39.3 million paid in the second quarter of 2026 in relation to the site-based
1
Torex Gold Resources Inc. | TSX: TXG
employee profit sharing program for 2025 in Mexico. Free cash flow3 of $94.2 million (YTD - $251.5 million) is
net of cash outlays for capital expenditures, lease payments, and interest.
•
Strong financial liquidity: In July, the Company amended its fully undrawn $350.0 million revolving credit
facility, extending the maturity by one year to June 2030, while maintaining the $200.0 million accordion
feature that is available at the discretion of the lenders. The quarter closed with $506.3 million in available
liquidity3, including $169.4 million in cash and $336.9 million available on the $350.0 million credit facility, net
of letters of credit outstanding of $13.1 million.
•
Media Luna North Project: During the second quarter of 2026, $12.0 million (YTD - $26.7 million) of nonsustaining capital expenditures were incurred relating to the development of Media Luna North. Development
of the main access ramp and haulage drift continue to track well. First production at Media Luna North
remains on track for late 2026.
•
Exploration and drilling activities4: In July, the Company announced results from its drilling and exploration
programs within the ELG Underground and Media Luna Cluster. Results to date support the Company's
objective of expanding resources while enhancing and extending the current production profile of the Morelos
Complex:
•
•
•
ELG Underground: Drilling results continue to demonstrate the potential to replace reserves and
expand resources, with mineralization extended along the El Limón Sur and El Limón West trends
and continued success in identifying mineralization at depth and along strike beyond the current
resource boundaries.
•
Media Luna Cluster: Drilling results support resource growth through the potential expansion of
mineralization to the south and east of the Media Luna deposit, while ongoing drilling at Media Luna
North continues to de-risk the planned start of production and identify extensions at depth.
•
Regional exploration: Drilling continued to advance at priority target Atzcala while initial drilling
commenced at El Naranjo. The programs at both are focused on evaluating resource potential more
broadly across the Morelos Property.
•
Revised expenditures: Exploration and drilling expenditures are now forecast at $85.0 million
(previously $77.0 million) given an expanded drilling program to test the eastern and southern
extensions of the Media Luna deposit within the recently identified San Miguel Corridor. The
Company believes the San Miguel Fault could potentially be the main source for mineralizing fluids
within the Media Luna Cluster.
Return of capital to shareholders5: In May, the Company announced an enhanced return of capital program
targeting the return of $350.0 million to shareholders during 2026, through a combination of share purchases
and dividends. Through the first half of 2026, the Company returned $176.2 million, representing
approximately 50% of the targeted threshold for 2026.
•
Dividends: During the second quarter of 2026, the Company paid dividends of $10.8 million
(YTD - $21.2 million). On August 6, 2026, the Company declared a quarterly dividend of C$0.16 per
common share ("Torex Share"), payable on September 4, 2026, to shareholders of record on August
21, 2026.
•
Share Repurchases: During the first half of 2026, the Company repurchased 3,132,783 Torex
Shares for $155.0 million (C$212.8 million) at an average price per share of $49.47 (C$67.91).
Los Reyes Preliminary Economic Assessment ("PEA")6: On July 7, 2026, the Company released the
results of the PEA for its Los Reyes project in Sinaloa, Mexico. The PEA estimates an after-tax NPV (5%) of
$1,491 million, an after-tax IRR of 37.3%, a 1.9-year payback period and average annual production of
134 koz AuEq6 over a 14.4-year mine life (161 koz AuEq6 over first 11 years). The project is expected to
generate robust margins, with life-of-mine all-in sustaining costs averaging $1,617/oz AuEq6 and an estimated
2
Torex Gold Resources Inc. | TSX: TXG
upfront capital investment of $515 million, which is expected to be fully funded through cash flows generated
by the Morelos Complex.
•
Responsible Gold Mining Report: In May, the Company released its 2025 Responsible Gold Mining Report,
highlighting continued progress across its environmental, social and governance initiatives. This included
commissioning of a new solar plant, improved water recycling, reduced greenhouse gas emissions, industryleading safety performance and adherence to global sustainability standards.
•
Chief Executive Officer ("CEO") and Chief Financial Officer ("CFO") Transition: Effective June 17, 2026,
Andrew Snowden assumed the role of President and CEO following the retirement of Jody Kuzenko.
Concurrently, Dan Rollins, formerly Senior Vice President, Corporate Development & Investor Relations,
assumed the role of CFO.
•
Planned U.S. Listing: The Company plans to pursue a secondary listing of Torex shares on the NYSE within
the coming months. Preparation for the listing is underway, and the Company intends to prepare the required
regulatory filings and exchange application in due course. An update on timing of a U.S. listing is expected to
be provided with the release of Q3 2026 financial results.
1 Gold equivalent ounces produced and sold include production and sales of silver (Ag) and copper (Cu) converted to a gold equivalent based on a ratio
of the average market prices for each commodity sold in the period. For the three months ended June 30, 2026, market prices averaged $4,506/oz gold
(Au), $73.15/oz Ag, and $6.05/lb Cu, and AuEq (oz) = Au (oz) + 1,000 * (73.15 / 4,506) x Ag (koz) + 1,000,000 x (6.05 / 4,506) x Cu (mlb). For the six
months ended June 30, 2026, market prices averaged $4,693/oz Au, $78.83/oz Ag, and $5.93/lb Cu, and AuEq (oz) = Au (oz) + 1,000 * (78.83 / 4,693) x
Ag (koz) + 1,000,000 x (5.93 / 4,693) x Cu (mlb).
2 Production guidance is reiterated using revised metal pricing assumptions of $4,500/oz Au, $72.50/oz Ag, and $6.00/lb Cu, and AuEq (oz) = Au (oz) +
1,000 * (72.50/ 4,500) x Ag (koz) + 1,000,000 x (6.00/ 4,500) x Cu (mlb). Revised guidance for all-in sustaining costs reflect revised commodity price
assumptions. Original 2026 production and AISC guidance assumed metal prices of $4,000/oz Au, $45.00/oz Ag, and $4.90/lb Cu, and AuEq (oz) = Au
(oz) + 1,000 * (45 / 4,000) x Ag (koz) + 1,000,000 x (4.90 / 4,000) x Cu (mlb).
3 These measures are non-GAAP financial measures with no standardized meaning under IFRS and might not be comparable to similar financial
measures disclosed by other issuers. Refer to “Non-GAAP Financial Performance Measures” for further information and a detailed reconciliation to the
comparable IFRS measures.
4 For more information on the Morelos exploration and drilling results, see the Company’s news release titled “Torex Gold Provides Q2 2026 Morelos
Drilling & Exploration Update” issued on July 13, 2026, and filed on SEDAR+ at www.sedarplus.ca and on the Company’s website at
www.torexgold.com.
5 For more information on the Company's return of capital program, see the Company’s news release titled “Torex Gold Reports Enhanced Return of
Capital Program” issued on May 6, 2026, and filed on SEDAR+ at www.sedarplus.ca and on the Company’s website at www.torexgold.com.
6 Gold equivalent ounces for the Los Reyes Preliminary Economic Assessment are calculated using assumed metal prices of $3,600/oz Au and $50/oz
Ag, AuEq (oz) = Au (oz) + Ag (oz) + 1,000 * (50 / 3,600). For more information on the Los Reyes Preliminary Economic Assessment, see the Company's
news release titled “Torex Gold Releases Results of Los Reyes Preliminary Economic Assessment” issued on July 7, 2026, and filed on SEDAR+ at
www.sedarplus.ca and on the Company's website at www.torexgold.com.
3
Torex Gold Resources Inc. | TSX: TXG
OPERATING AND FINANCIAL HIGHLIGHTS
Table 1.
Three Months Ended
Jun 30,
Mar 31,
Jun 30,
2026
2026
2025
In millions of U.S. dollars, unless otherwise noted
Safety
Lost-time injury frequency1
/million hours
Total recordable injury frequency1
/million hours
Operating Results - Gold Equivalent basis
Gold equivalent produced
oz AuEq
2
Gold equivalent payable produced
oz AuEq
Gold equivalent sold2
oz AuEq
2,3
Total cash costs
$/oz AuEq
All-in sustaining costs2,3
$/oz AuEq
2,3
Average realized gold price
$/oz AuEq
Financial Results
Revenue
$
Cost of sales
$
Earnings from mine operations
$
Net income
$
Per share – Basic
$/share
Per share – Diluted
$/share
3
Adjusted net earnings
$
Per share – Basic3
$/share
Per share – Diluted3
$/share
EBITDA3
$
3
Adjusted EBITDA
$
Cost of sales - gold equivalent basis
$/oz AuEq
Net cash generated from operating
$
activities
Net cash generated from operating
activities before changes in non-cash
$
operating working capital
Free cash flow3
$
Cash and cash equivalents
$
Debt, net of deferred finance
$
charges
Lease-related obligations
$
Net cash (debt)3
$
3
Available liquidity
$
1.
2.
3.
Six Months Ended
Jun 30,
Jun 30,
2026
2025
0.00
0.63
0.00
0.61
0.46
1.00
0.00
0.63
0.46
1.00
96,297
93,686
92,351
1,912
2,459
4,525
100,874
98,482
109,222
1,534
1,917
4,784
84,296
82,856
76,922
1,606
2,103
3,299
197,171
192,168
201,573
1,707
2,165
4,665
144,073
142,486
137,490
1,348
1,796
3,077
406.9
228.5
178.4
113.8
1.22
1.20
84.9
0.91
0.90
209.1
203.5
2,474
539.3
226.7
312.6
207.5
2.18
2.16
199.7
2.10
2.08
358.1
358.6
2,076
253.9
152.6
101.3
83.2
0.97
0.95
43.8
0.51
0.50
114.1
117.7
1,984
946.2
455.2
491.0
321.3
3.41
3.38
284.6
3.02
2.99
567.2
562.1
2,258
423.9
246.7
177.2
122.2
1.42
1.40
79.7
0.92
0.91
202.2
209.5
1,794
167.6
209.8
67.8
377.4
57.9
165.1
174.2
95.3
339.3
77.6
94.2
169.4
157.3
130.0
(37.5)
103.0
251.5
169.4
(170.8)
103.0
–
–
227.2
–
227.2
99.4
70.0
506.3
101.1
28.9
466.9
98.9
(225.9)
209.1
99.4
70.0
506.3
98.9
(225.9)
209.1
On a 12-month rolling basis, per million hours worked.
Gold equivalent ounces produced and sold include production of silver and copper converted to a gold equivalent based on a ratio of the average
market prices for each commodity sold in the period. Refer to “Gold Equivalent Reporting” for the relevant average market prices by commodity.
Total cash costs, all-in sustaining costs, average realized gold price, adjusted net earnings, adjusted net earnings per share, EBITDA, adjusted
EBITDA, free cash flow, net cash (debt) and available liquidity are non-GAAP financial measures with no standardized meaning under IFRS and
might not be comparable to similar financial measures disclosed by other issuers. Refer to “Non-GAAP Financial Performance Measures” for further
information and a detailed reconciliation to the comparable IFRS measures.
4
Torex Gold Resources Inc. | TSX: TXG
SECOND QUARTER REPORT
The following abbreviations are used throughout this MD&A: $ (United States dollar), C$ (Canadian dollar), MXN
(Mexican peso), TCC (total cash costs), AISC (all-in sustaining costs), Au (gold), AuEq (gold equivalent), Ag
(silver), Cu (copper), oz (ounce), gpt (grams per tonne), koz (thousand ounces), moz (million ounces), lb (pound),
klb (thousand pounds), mlb (million pounds), kt (thousand tonnes), mt (million tonnes), m (metres), km
(kilometres), MW (megawatt), kV (kilovolt), w:o (waste to ore), and tpd (tonnes per day).
TABLE OF CONTENTS
HIGHLIGHTS .....................................................................................................................................................................
OPERATING AND FINANCIAL HIGHLIGHTS .............................................................................................................
TABLE OF CONTENTS ...................................................................................................................................................
COMPANY OVERVIEW ..................................................................................................................................................
USE OF NON-GAAP FINANCIAL PERFORMANCE MEASURES ..........................................................................
GOLD EQUIVALENT REPORTING ...............................................................................................................................
GUIDANCE ........................................................................................................................................................................
1
4
5
6
6
7
8
FINANCIAL RESULTS .....................................................................................................................................................
SECOND QUARTER AND YEAR TO DATE 2026 FINANCIAL RESULTS .............................................................
RESULTS OF OPERATIONS .........................................................................................................................................
ENVIRONMENT, SOCIAL & GOVERNANCE ..............................................................................................................
DEVELOPMENT ACTIVITIES ........................................................................................................................................
EXPLORATION AND DRILLING ACTIVITIES .............................................................................................................
FINANCIAL CONDITION REVIEW ................................................................................................................................
DEBT FINANCING ...........................................................................................................................................................
LIQUIDITY AND CAPITAL RESOURCES.....................................................................................................................
OUTSTANDING SHARE DATA ......................................................................................................................................
NON-GAAP FINANCIAL PERFORMANCE MEASURES ..........................................................................................
ADDITIONAL IFRS FINANCIAL MEASURES ..............................................................................................................
ECONOMIC TRENDS ......................................................................................................................................................
SUMMARY OF QUARTERLY RESULTS ......................................................................................................................
OFF-BALANCE SHEET ARRANGEMENTS ................................................................................................................
ACCOUNTING POLICIES AND CRITICAL ACCOUNTING ESTIMATES ...............................................................
RECENT ACCOUNTING PRONOUNCEMENTS ........................................................................................................
FINANCIAL RISK MANAGEMENT ................................................................................................................................
RISKS AND UNCERTAINTIES .......................................................................................................................................
INTERNAL CONTROL OVER FINANCIAL REPORTING ..........................................................................................
QUALIFIED PERSONS ...................................................................................................................................................
ADDITIONAL INFORMATION ........................................................................................................................................
CAUTIONARY NOTES ....................................................................................................................................................
9
10
14
16
18
19
22
24
24
26
27
37
38
39
40
40
40
40
42
42
43
43
43
5
Torex Gold Resources Inc. | TSX: TXG
COMPANY OVERVIEW
Torex Gold Resources Inc. is a Canadian mining company engaged in the exploration, development, and
production of gold, copper, and silver from its flagship Morelos Complex in Guerrero, Mexico. The Company also
owns the Los Reyes gold-silver project in Sinaloa, Mexico and a portfolio of early-stage exploration projects,
including Batopilas and Guigui in Chihuahua, Mexico, La Gloria in Sonora, Mexico, and Medicine Springs in
Nevada, USA, as well as an option to acquire the Gryphon project in Nevada, USA.
The Company’s key strategic objectives are: optimize Morelos production and costs; disciplined growth and
capital allocation; grow reserves and resources; project delivery excellence; retain and attract best industry talent
and other exploration projects; and be an industry leader in responsible mining. In addition to realizing the full
potential of the Morelos Property, the Company continues to seek opportunities to acquire assets that enable
diversification and deliver value to shareholders.
USE OF NON-GAAP FINANCIAL PERFORMANCE MEASURES
The Company has presented certain non-GAAP financial measures in this MD&A which include: total cash costs,
all-in sustaining costs, all-in sustaining costs margin, sustaining and non-sustaining capital expenditures, average
realized gold price, adjusted net earnings, adjusted net earnings per share, EBITDA, adjusted EBITDA, free cash
flow, net cash (debt), available liquidity and unit cost measures. For further information and a detailed
reconciliation to the comparable IFRS measures refer to the “Non-GAAP Financial Performance Measures”
section of this MD&A. The Company believes that these measures, while not a substitute for measures of
performance prepared in accordance with IFRS, provide investors with an improved ability to evaluate the
underlying performance of the Company. These measures do not have any standardized meaning prescribed
under IFRS, and, therefore, may not be comparable to other issuers.
6
Torex Gold Resources Inc. | TSX: TXG
GOLD EQUIVALENT REPORTING
Gold equivalent ounces produced and sold include production of silver and copper converted to a gold equivalent
based on a ratio of the average market prices (not realized metal prices) for each commodity sold in the period.
The following table provides a summary of the quantities produced and sold and average market prices for each
commodity in the respective periods.
Table 2.
Gold equivalent produced
Gold produced
Silver produced
Copper produced
oz AuEq
oz
koz
mlb
Three Months Ended
Jun 30,
Mar 31,
Jun 30,
2026
2026
2025
96,297
100,874
84,296
69,278
73,647
69,576
520.2
543.0
336.5
13.9
14.9
8.0
Gold equivalent payable produced1
Gold payable produced1
Silver payable produced1
Copper payable produced1
oz AuEq
oz
koz
mlb
93,686
68,257
468.4
13.3
98,482
72,901
489.4
14.3
82,856
68,955
307.4
7.7
192,168
141,158
957.8
27.6
142,486
127,285
347.0
8.2
Gold equivalent sold1
Gold sold1
Silver sold1
Copper sold1
oz AuEq
oz
koz
mlb
92,351
68,058
448.9
12.6
109,222
81,233
539.0
15.6
76,922
63,493
291.3
7.4
201,573
149,291
987.9
28.2
137,490
123,249
324.1
7.7
$/oz
$/oz
$/lb
4,506
73.15
6.05
4,873
84.33
5.83
3,280
33.68
4.32
4,693
78.83
5.93
3,067
32.76
4.28
Average market gold price2
Average market silver price2
Average market copper price2
1.
2.
Six Months Ended
Jun 30,
Jun 30,
2026
2025
197,171
144,073
142,925
127,996
1,063.2
378.0
28.8
8.6
Payable production and sold values include payable deductions associated with copper concentrate, doré and other products.
Based on the London Bullion Market Association (“LBMA”) PM fix for gold, LBMA fix for silver and London Metal Exchange (“LME”) cashsettlement price for copper.
7
Torex Gold Resources Inc. | TSX: TXG
GUIDANCE
Production is expected to strengthen in the second half of the year as ore from higher-grade stopes is processed,
with production forecast to increase quarter-over-quarter through the second half of 2026. As such, full-year
production is tracking to the midpoint of the guided range of 420,000 to 470,000 oz AuEq.
AISC1 have been revised to $2,000 to $2,100 per oz AuEq sold from $1,750 to $1,850 per oz AuEq sold. The
increase in AISC guidance reflects several factors including: the impact of the stronger Mexican peso (MXN:USD
of 17.5:1 versus 19:1); higher plant reagent consumption rates and plant reagent unit prices (primarily sodium
cyanide to support lower gold recovery stopes processed); the impact of higher mining volumes and lower gold
recoveries; revised sustaining capital expenditures of $135.0 to $145.0 million from $120.0 to $130.0 million
(reflecting the impact of the stronger Mexican peso on development costs and additional equipment leases); as
well as higher assumed full year metal prices for gold ($4,500/oz versus $4,000/oz), silver ($72.50/oz versus
$45.00/oz) and copper ($6.00/lb versus $4.90/b), which, relative to original guidance, have resulted in higher
royalties, Mexican profit-sharing payments, and land access agreements with local communities, also referred to
as temporary occupation agreements ("TOAs").
The following table summarizes the Company’s performance to date relative to 2026 guidance:
Table 3.
2026 Guidance2
In millions of U.S. dollars, unless otherwise noted
Production
Gold
Silver
Copper
Gold Equivalent
Sales
Gold Equivalent
All-in Sustaining Costs1
Gold Equivalent basis
Capital Expenditures1
Sustaining Capital Expenditures
Non-Sustaining Capital Expenditures
Total Capital Expenditures
1.
2.
3.
4.
Revised 2026
Guidance3
Q2 2026 YTD
Performance
oz
320,000 to 365,000
koz
2,200 to 2,500
mlb
60 to 65
oz AuEq 420,000 to 470,000
No change
No change
No change
No change
142,925
1,063.2
28.8
197,171
oz AuEq 410,000 to 460,000
No change
201,573
1,750 to 1,850
2,000 to 2,100
2,165
120 to 130
165 to 175
285 to 305
135 to 145
No change
300 to 320
68.8
55.8
124.6
$/oz AuEq
$
$
$
These measures are non-GAAP financial measures. Refer to “Non-GAAP Financial Performance Measures” for further information and a detailed
reconciliation to the comparable IFRS measures.
Original 2026 guidance assumed a MXN:USD of 19.0 and metal prices of $4,000/oz gold, $45/oz silver, and $4.90/Ib copper.
Guidance is reiterated using revised foreign exchange and metal pricing assumptions of MXN:USD of 17.5 and $4,500/oz gold, $72.50/oz silver,
and $6.00/lb copper.
For the six months ended June 30, 2026, refer to “Gold Equivalent Reporting” for the relevant average market prices by commodity.
8
Torex Gold Resources Inc. | TSX: TXG
FINANCIAL RESULTS
Table 4.
In millions of U.S. dollars, unless otherwise noted
Revenue1
$
Gold1
$
1
Silver
$
Copper1
$
Treatment, refining and other cost deductions
$
Cost of sales
$
Production costs
$
Royalties
$
Depreciation and amortization
$
Earnings from mine operations
$
General and administrative expenses
$
Exploration and evaluation expenses
$
Derivative gain, net
$
Finance (income) costs and other, net
$
Foreign exchange loss (gain)
$
Current income tax expense
$
Deferred income tax recovery
$
Net income
$
Per share – Basic
$/share
Per share – Diluted
$/share
2
Adjusted net earnings
$
Per share – Basic2
$/share
Per share – Diluted2
$/share
Cost of sales - gold equivalent basis
$/oz AuEq
Total cash costs2
$/oz AuEq
All-in sustaining costs2
$/oz AuEq
2
All-in sustaining costs margin
$/oz AuEq
Average realized gold price2
$/oz AuEq
1.
2.
Three Months Ended
Jun 30,
Jun 30,
2026
2025
406.9
253.9
294.0
211.5
30.9
10.2
80.6
33.4
1.4
(1.2)
228.5
152.6
166.2
115.1
13.4
8.6
48.9
28.9
178.4
101.3
8.6
14.0
12.9
6.9
(4.8)
(5.1)
(0.7)
5.2
1.7
0.3
76.2
34.6
(29.3)
(37.8)
113.8
83.2
1.22
0.97
1.20
0.95
84.9
43.8
0.91
0.51
0.90
0.50
2,474
1,984
1,912
1,606
2,459
2,103
2,066
1,196
4,525
3,299
Six Months Ended
Jun 30,
Jun 30,
2026
2025
946.2
423.9
694.9
379.2
78.1
11.3
169.4
34.6
3.8
(1.2)
455.2
246.7
317.5
171.3
32.4
14.6
105.3
60.8
491.0
177.2
20.1
30.4
21.5
12.3
(12.0)
(7.9)
2.0
7.8
(0.2)
1.1
164.9
40.6
(26.6)
(29.3)
321.3
122.2
3.41
1.42
3.38
1.40
284.6
79.7
3.02
0.92
2.99
0.91
2,258
1,794
1,707
1,348
2,165
1,796
2,500
1,281
4,665
3,077
Includes provisional price adjustments on sales of copper concentrate and precipitate.
These measures are non-GAAP financial measures. Refer to “Non-GAAP Financial Performance Measures” for further information and a detailed
reconciliation to the comparable IFRS measures.
9
Torex Gold Resources Inc. | TSX: TXG
SECOND QUARTER AND YEAR TO DATE 2026 FINANCIAL RESULTS
Revenue totalled $406.9 million (YTD - $946.2 million)
Revenue in the second quarter of 2026 increased 60% relative to the second quarter of 2025, primarily due to a
37% increase in the average market gold price, together with a 20% increase in gold equivalent ounces sold. The
increase in gold equivalent ounces sold is in line with a 21% increase in average plant throughput compared to
the prior year, given that operations were ramping up following the restart of processing operations in late March
2025 as part of the Media Luna Project. The higher throughput was partially offset by a lower average grade of
ore processed. Revenue excludes the realized impact of gold derivative contracts, which is included in the
average realized gold price. The average realized gold price in the second quarter of 2025 included a loss of
$1.3 million ($17 per oz AuEq) on gold put options. The Company did not have any derivative contracts for gold,
silver, and copper outstanding as at quarter end.
Sales of copper concentrate are provisionally priced, and sales prices are subject to final adjustment based on
quoted market prices during a quotational period specified in the contract. Revenue for the second quarter of
2026 includes a net loss of $7.1 million due to price adjustments on provisionally priced sales, comprising a net
realized loss of $8.8 million for sales that were settled in final during the quarter and a net unrealized gain of
$1.7 million to adjust sales that remain unsettled to market prices at the end of the quarter.
Revenue in the first half of 2026 increased 123% relative to the first half of 2025, primarily due to a 53% increase
in the average market gold price, and a 47% increase in gold equivalent ounces sold. Gold equivalent ounces
sold were significantly lower in the first half of 2025 largely reflecting the impact of the four-week tie-in period at
the processing plant in connection with the Media Luna Project in the first quarter of 2025 and the subsequent
ramp up during the second quarter of 2025. The average realized gold price in the first half of 2025 includes a
realized loss of $2.1 million ($15 per oz AuEq) in the first half of 2025 on gold put options. The Company did not
have any derivative contracts for gold, silver, and copper outstanding as at quarter end.
Sales of copper concentrate in the first half of 2026 included a net loss of $31.1 million due to price adjustments
on provisional sales, comprising a net realized loss of $0.7 million for sales settled during the period and a net
unrealized loss of $30.4 million to adjust sales that remained unsettled to market prices as at June 30, 2026.
Cost of sales was $228.5 million or $2,474 per oz AuEq sold (YTD - $455.2 million or $2,258 per oz AuEq
sold)
Cost of sales was higher in the second quarter of 2026 compared to the second quarter of 2025 by $75.9 million
or 50% and 25% higher on a per oz AuEq basis due to increased processing rates with Media Luna fully ramped
up (10,793 tpd versus 8,887 tpd), higher production unit costs, royalties and depreciation and amortization
expense.
Production costs in the second quarter of 2026 were 44% higher compared to the second quarter of 2025
primarily due to the 20% increase in gold equivalent ounces sold, the impact of higher gold prices on long-term
lease agreements with Ejidos, a stronger average Mexican peso exchange rate, as well as higher plant reagent
consumption levels to support recovery rates in the process plant given lower gold recovery stopes mined during
the period. Plant reagent costs have also been impacted by elevated unit pricing as a result of increased prices
for key inputs in the manufacturing process (such as ammonia) as well as freight costs, both a direct result of the
current conflict in Iran and its impact on global energy prices. These cost pressures impacted plant reagent pricing
in the second quarter and are expected to persist during the second half of 2026.
Royalties were 56% higher than the second quarter of 2025, aligned with higher revenue of 60%.
Depreciation and amortization expense was 69% higher than the second quarter of 2025 on a total basis and 41%
higher on a per oz AuEq sold basis. The 69% increase in depreciation and amortization primarily reflects the
commencement of commercial production at Media Luna in the second quarter of 2025 as well as other assets
commissioned in the second half of 2025, which increased the depreciable asset base. Depreciation was also
higher due to increased units-of-production depreciation resulting from higher plant throughput.
10
Torex Gold Resources Inc. | TSX: TXG
Cost of sales was higher in the first half of 2026 compared to the first half of 2025 by $208.5 million or 85% and
26% higher on a per oz AuEq basis due to increased processing rates with Media Luna fully ramped up
(10,643 tpd versus 8,361 tpd), higher unit production costs, royalties, depreciation and amortization expense.
Production costs in the first half of 2026 were 85% higher than the first half of 2025 primarily due to the 47%
increase in gold equivalent ounces sold, the impact of higher gold prices on long-term lease agreements with
Ejidos, higher plant reagent consumption rates and unit pricing, and a stronger average Mexican peso exchange
rate.
Royalties were 122% higher than the first half of 2025, aligned with higher revenue of 123%.
Depreciation and amortization expense was 73% higher than the first half of 2025 on a total basis and 18% higher
on a per oz AuEq sold basis. The 73% increase in depreciation and amortization primarily reflects the
commencement of commercial production at Media Luna in the second quarter of 2025 as well as other assets
commissioned in the second half of 2025, which increased the depreciable asset base. Depreciation was also
higher due to increased units-of-production depreciation resulting from higher plant throughput. For 2026,
depreciation and amortization is expected to range between $240 and $270 million, unchanged from the prior
estimate.
All-in Sustaining Costs2 were $2,459 per oz AuEq sold (YTD - $2,165 per oz AuEq sold)
All-in sustaining costs were 17% higher on a per oz AuEq basis relative to the second quarter of 2025, primarily
due to the higher production costs described above, as well as a 33% increase in sustaining capital expenditures
primarily related to increased underground development given the successful ramp-up of Media Luna to design
mining rates.
The 21% increase in all-in sustaining costs on a per oz AuEq basis relative to the first half of 2025 was also
primarily due to higher production costs described above and 60% higher sustaining capital expenditures,
reflecting the fact that commercial production at Media Luna was declared during the second quarter of 2025. The
increase in sustaining capital expenditures is particularly significant because expenditures on the Media Luna
Project prior to May 1, 2025 were classified as non-sustaining capital expenditures during the development
period.
General and administrative expenses of $8.6 million (YTD - $20.1 million)
General and administrative expenses primarily comprise corporate office employee and director costs, sharebased compensation, and consulting and professional fees. Excluding the remeasurement of share-based
payments (gain of $0.8 million in the second quarter of 2026 and loss of $6.2 million in the second quarter of
2025), general and administrative expenses would have been $9.4 million, $1.6 million higher than the second
quarter of 2025, primarily due to higher consulting and professional fees.
Excluding the remeasurement of share-based payments (loss of $0.4 million in the first half of 2026 and loss of
$13.8 million in the first half of 2025), general and administrative expenses would have been $19.7 million,
$3.1 million higher compared to the first half of 2025, primarily due to higher consulting and professional fees.
Derivative gain, net, of $4.8 million (YTD - $12.0 million gain)
To manage the foreign currency risk related to operating expenditures, the Company has entered into foreign
exchange forward contracts and zero-cost collars. As at June 30, 2026, the remaining MXN/USD foreign
exchange collar contracts to settle a notional value of $15.0 million between July 2026 and September 2027 have
a weighted average put strike (floor) rate of 18.50:1 and a weighted average call strike (ceiling) rate of 20.20:1. As
at June 30, 2026, the MXN/USD foreign exchange forwards are for the purchase of MXN 2,504.7 million for
$137.0 million between July 2026 and May 2028 at a weighted average MXN/USD foreign exchange rate of
18.28:1.
11
Torex Gold Resources Inc. | TSX: TXG
In the second quarter of 2026, the Company recognized a net gain of $5.2 million on the foreign exchange collars
and forwards, primarily due to the appreciation of the Mexican peso (gain of $6.6 million in the second quarter of
2025).
In the first half of 2026, the Company recognized a net gain of $5.5 million on foreign exchange collars and
forwards, primarily due to the appreciation of the Mexican peso, compared to a net gain of $10.0 million in the first
half of 2025.
To mitigate exposure to gold, silver and copper price fluctuations on provisionally priced concentrate sales, from
time to time the Company enters into quotational period hedges (“QP Hedges”) with the objective of achieving
final settlement prices of one month after shipment. Under the Company’s concentrate sales contracts, sales
prices are subject to final adjustment based on quoted market prices during the quotational period specified in the
underlying sales agreements. These QP Hedges do not qualify for hedge accounting under IFRS 9, Financial
Instruments (“IFRS 9”). Accordingly, they are classified as financial instruments measured at fair value through
profit or loss (“FVTPL”), with changes in fair value recognized in the Condensed Consolidated Interim Statements
of Operations and Comprehensive Income in the period in which they arise. In the first quarter of 2026, given
pricing elections by certain customers, the Company entered into QP Hedges on 17,500 ounces of gold and
153,000 ounces of silver to achieve final settlement prices of one month after shipment. No new QP Hedges were
entered into during the second quarter of 2026. The Company did not have any QP Hedges in the second quarter
of 2025.
In the second quarter of 2026, the Company recognized a net loss of $0.4 million (a realized gain of $12.4 million
and an unrealized loss of $12.8 million) on QP Hedges due to the weakening of gold and silver forward prices. In
the first half of 2026, the Company recognized a net gain of $6.5 million (a realized loss of $2.0 million and an
unrealized gain of $8.5 million) on QP hedges due to the appreciation of gold and silver forward prices. No QP
Hedges were outstanding as at the end of the second quarter.
The Company's foreign exchange derivatives and QP Hedges have not been designated as hedges; therefore,
movements in the fair value of the derivatives are recognized in net income each period.
Finance (income) costs and other, net, of $0.7 million income (YTD - $2.0 million costs)
The net finance income during the quarter compared to net costs in the comparative period of 2025, and the
decrease in net finance costs in the first half of 2026 relative to the comparative period in 2025, were primarily
related to interest received on the settlement of VAT receivables. The change was further supported by lower
interest costs resulting from the repayment of the Company's debt facility in the first quarter of 2026, partially
offset by interest expense on copper concentrate sales advances.
Foreign exchange loss of $1.7 million (YTD - $0.2 million gain)
The foreign exchange loss in the second quarter of 2026 was primarily due to the appreciation of the Mexican
peso by 3.3% (YTD - 2.8%). A net foreign exchange gain was recorded in the first half of 2026, largely reflecting
the timing of settlements of Mexican peso denominated monetary balances.
Current income and mining tax expense of $76.2 million (YTD - $164.9 million expense)
The 120% increase in current income and mining tax expense compared to the second quarter of 2025 was
primarily due to a 75% increase in earnings from mine operations before depreciation and amortization expense,
and the tax effect of the currency translation of the tax liability due to the 3.3% appreciation of the Mexican peso in
the second quarter of 2026 compared to the 7.0% depreciation in the prior year, partially offset by the decrease in
accrued liabilities primarily related to the Mexican profit sharing payment for 2025 paid during the second quarter.
The 306% increase in current income and mining tax expense compared to the first half of 2025 was primarily due
to a 151% increase in earnings from mine operations before depreciation and amortization expense, and the tax
effect of the currency translation of the tax liability due to the 2.8% appreciation of the Mexican peso in the first
12
Torex Gold Resources Inc. | TSX: TXG
half of 2026 compared to the 6.8% depreciation in the prior year, partially offset by the decrease in accrued
liabilities, primarily related to the Mexican profit sharing payment for 2025 paid during the second quarter.
Deferred income tax recovery of $29.3 million (YTD - $26.6 million recovery)
The deferred income tax recovery in both the second quarter and first half of 2026 were slightly lower compared
to the recovery in the comparative periods of 2025 primarily driven by the tax effect of currency translation on the
tax base as a result of an appreciation of the Mexican peso compared to the prior year, higher depreciation for
accounting than for tax purposes, which on a net basis increased the difference between the book value and tax
value of the assets in the determination of deferred tax, and the decrease in the temporary difference on inventory
balances for accounting than for tax purposes, partially offset by the decrease in accrued liabilities which are only
deductible for tax purposes once invoiced, and the decrease in the provision for uncertain tax positions.
For the three and six months ended June 30, 2026, the tax effect of currency translation on the tax base was a
recovery of $24.8 million and $20.6 million, respectively (three and six months ended June 30, 2025 - recovery of
$43.8 million and $42.6 million, respectively).
As at June 30, 2026, the closing value of property, plant and equipment for tax purposes was $40.4 billion
Mexican pesos and the closing value of inventory for tax purposes was $3.6 billion Mexican pesos.
Net income of $113.8 million (YTD - $321.3 million income)
Net income for the quarter was $113.8 million compared to net income of $83.2 million in the second quarter of
2025. The increase in net income was primarily due to higher average realized prices, a 20% increase in gold
equivalent ounces sold, lower general and administrative expense primarily due to lower share-based
compensation expense, and lower finance costs, offset by higher costs of sales, higher exploration and evaluation
costs, and a higher net income tax expense.
Net income in the first half of 2026 was $321.3 million compared to net income of $122.2 million in the first half of
2025. The increase in net income was primarily due to a higher average realized prices, a 47% increase in gold
equivalent ounces sold, lower general and administrative expense primarily due to lower share-based
compensation expense, and lower finance costs, offset by higher cost of sales, higher exploration and evaluation
costs, and a higher net income tax expense.
13
Torex Gold Resources Inc. | TSX: TXG
RESULTS OF OPERATIONS
Mining
The following table1 summarizes the mining activities for the Company’s Morelos Complex:
Table 5.
Three Months Ended
Jun 30,
Mar 31,
Jun 30,
2026
2026
2025
Six Months Ended
Jun 30,
Jun 30,
2026
2025
Media Luna Underground
Ore tonnes mined
Ore tonnes mined per day
Average gold grade of ore mined
Average silver grade of ore mined
Average copper grade of ore mined
kt
tpd
gpt
gpt
%
702
7,714
2.12
23.9
0.92
682
7,578
1.61
24.2
0.94
389
4,278
1.78
24.6
0.84
1,384
7,646
1.86
24.1
0.93
489
2,703
1.72
26.4
0.89
ELG Underground
Ore tonnes mined
Ore tonnes mined per day
Average gold grade of ore mined
Average silver grade of ore mined
Average copper grade of ore mined
kt
tpd
gpt
gpt
%
280
3,079
4.15
8.3
0.37
276
3,070
3.71
7.1
0.36
254
2,790
4.28
6.8
0.26
556
3,075
3.93
7.7
0.37
441
2,434
4.47
6.9
0.29
ELG Open Pits
Ore tonnes mined
Waste tonnes mined
Total tonnes mined
Ore tonnes mined per day
Waste tonnes mined per day
Strip ratio
Average gold grade of ore mined
Average silver grade of ore mined
Average copper grade of ore mined
kt
kt
kt
tpd
tpd
w:o
gpt
gpt
%
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
–
194
847
1,042
2,133
9,313
4.4
3.44
5.2
0.15
–
–
–
–
–
–
–
–
–
361
1,353
1,714
1,992
7,477
3.8
3.39
4.8
0.13
Morelos Complex - Total
Ore tonnes mined
Ore tonnes mined per day
Average gold grade of ore mined
Average silver grade of ore mined
Average copper grade of ore mined
kt
tpd
gpt
gpt
%
982
10,793
2.70
19.5
0.77
958
10,649
2.21
19.3
0.77
837
9,201
2.92
14.7
0.51
1,940
10,721
2.46
19.4
0.77
1,291
7129
3.12
13.69
0.47
Rounding may result in apparent summation differences.
Media Luna Underground achieved a quarterly average mining rate of 7,714 tpd in the second quarter of 2026, an
improvement from the average of 7,578 tpd mined in the previous quarter. As planned, sequencing at Media Luna
Underground resulted in higher-grade stopes mined in the second quarter of 2026 relative to the previous quarter.
Mined grades are expected to increase further in the second half of 2026.
At ELG Underground, the Company achieved a quarterly average mining rate of 3,079 tpd in the second quarter
of 2026, consistent with the previous quarter. The consistently strong mining rates at ELG Underground are
14
Torex Gold Resources Inc. | TSX: TXG
expected to yield a similar volume of production to 2025 through the remainder of 2026. The average grade of ore
mined improved quarter over quarter due to mine sequencing as planned. Mining from the ELG Open Pits
concluded in the third quarter of 2025.
Plant Performance
The following table1 summarizes the processing activities for the Company’s Morelos Complex:
Table 6.
Total tonnes processed
Average plant throughput
Average gold grade of ore processed
Average silver grade of ore processed
Average copper grade of ore
processed
Average gold recovery
Average silver recovery
Average copper recovery
Gold equivalent produced2
Gold produced
Silver produced
Copper produced
Gold equivalent payable produced2,3
Gold payable produced3
Silver payable produced3
Copper payable produced3
Gold equivalent sold2,3
Gold sold3
Silver sold3
Copper sold3
1.
2.
3.
kt
tpd
gpt
gpt
Three Months Ended
Jun 30,
Mar 31,
Jun 30,
2026
2026
2025
982
944
809
10,793
10,492
8,887
2.55
2.79
2.92
19.29
22.68
20.46
Six Months Ended
Jun 30,
Jun 30,
2026
2025
1,926
1,513
10,643
8,361
2.67
2.80
20.95
13.91
%
0.67
0.79
0.54
0.73
0.40
%
%
%
oz AuEq
oz
koz
mlb
oz AuEq
oz
koz
mlb
oz AuEq
oz
koz
mlb
85.4
86.1
94.9
96,297
69,278
520.2
13.9
93,686
68,257
468.4
13.3
92,351
68,058
448.9
12.6
84.6
78.7
90.3
100,874
73,647
543.0
14.9
98,482
72,901
489.4
14.3
109,222
81,233
539.0
15.6
93.5
63.0
84.4
84,296
69,576
336.5
8.0
82,856
68,955
307.4
7.7
76,922
63,493
291.3
7.4
85.0
82.1
92.4
197,171
142,925
1,063.2
28.8
192,168
141,158
957.8
27.6
201,573
149,291
987.9
28.2
92.1
58.0
68.0
144,073
127,996
378.0
8.6
142,486
127,285
347.0
8.2
137,490
123,249
324.1
7.7
Rounding may result in apparent summation differences.
Gold equivalent ounces produced and sold include production of silver and copper converted to a gold equivalent based on a ratio of the average
market prices for each commodity sold in the period. Refer to “Gold Equivalent Reporting” for the relevant average market prices by commodity.
Payable production and sold values include payable deductions associated with copper concentrate, doré and other products. Payable production
is based on estimated payability factors but may vary based on customer.
Plant throughput in the second quarter of 2026 achieved an average rate of 10,793 tpd (YTD - 10,643 tpd), higher
than the preceding quarter of 10,492 tpd and exceeding design levels of 10,600 tpd. The average gold recovery
for the quarter was 85.4% (YTD - 85.0%), higher than the recovery of 84.6% in the previous quarter as mining
continued through lower-grade and lower gold-recovery areas of the Media Luna mine. The average copper
recovery for the quarter was 94.9% (YTD - 92.4%), higher than the recovery of 90.3% in the previous quarter.
Gold Equivalent Production and Sales
In the second quarter of 2026, 96,297 oz AuEq were produced (93,686 oz AuEq on a payable basis) and
92,351 oz AuEq were sold. Production in the second quarter of 2026 increased relative to the comparative period
in the prior year, primarily due to the ramp up of the Media Luna mine following the four-week tie-in period at the
processing plant during the first quarter of 2025 and the commencement of commercial production in the second
quarter of 2025.
15
Torex Gold Resources Inc. | TSX: TXG
ENVIRONMENT, SOCIAL & GOVERNANCE
Health and Safety
No lost-time injuries ("LTIs") were reported in Q2 for the fifth consecutive quarter. As at June 30, 2026, the
Company’s lost-time injury frequency (“LTIF”) was 0.00 and its total recordable injury frequency (“TRIF”) was 0.63.
Both rates include employees and contractors and are calculated per million hours worked on a rolling 12-month
basis.
During the quarter, the fourth annual Health and Safety Fair was held at the Morelos Complex with the
participation of 3,382 employees and contractors. The first annual Strategic Partners Safety Conference, intended
to improve alignment and cooperation on safety matters between the Company and key contractors, was also
held at the Morelos complex in Q2 involving 36 contractor companies and 100 attendees. The Company also
continued to implement its comprehensive Next Level Safety program, including ongoing implementation of the
Company-wide fatal risk standards at the operations and training workshops on the critical control verification
process. Safety First and Always sessions, designed to promote honest and open dialogue about individual and
collective risk tolerance, were 100% completed for all permanent full-time employees in the quarter, with 101
sessions involving 1,495 employees held year-to-date.
Lost-Time Injury Frequency and Total Recordable Injury Frequency Per Million Hours Worked on a Rolling 12-Month Basis:
June 2023 – June 2026
Environment & Climate Change
There were no reportable spills or environmental incidents during the second quarter of 2026 and there are
currently no material claims, demands, or legal proceedings against the Company related to environmental
matters. As such, the Company is on track to achieve its 2026 objective of zero reportable spills of 1,000 litres or
more that report to a natural water body.
In May, Torex disclosed its first Water Stewardship and Conservation Strategy, a multi-year framework to
strengthen water governance, improve water balance reporting transparency, formalize water conservation and
recycling targets, and improve operational efficiency as the Morelos Complex continues to extend and evolve. The
strategy includes the following targets:
•
•
To achieve at last 80% total water reused and recycled annually against a 2024 baseline of 58%;
A 60% increase in the recycling of treated domestic wastewater by 2030, completed to a 2024 baseline of
0%; and
16
Torex Gold Resources Inc. | TSX: TXG
•
Groundwater withdrawals limited to less than 50% of total operational water withdrawn by 2030 compared
to a 2024 baseline of 58%.
During the quarter, for the first time Torex also completed a full Scope 3 greenhouse gas (“GHG”) emissions
inventory for 2025 for the Morelos Complex, establishing a comprehensive picture of the Company’s total carbon
footprint across its value chain. The inventory was developed in accordance with the GHG Protocol Corporate
Value Chain (Scope 3) Accounting and Reporting Standard and satisfies the Company’s 2026 objective to
disclose Scope 3 emissions.
Community Relations
During the second quarter, positive and productive relationships were maintained with local communities. The
Company continued to implement unique community development agreements (“CODECOPs”) with 12
communities surrounding the Morelos Complex. The CODECOPs define community investment projects to be
delivered in partnership with local communities, as defined by local CODECOP committees. Projects associated
with the 2026 CODECOPs include community infrastructure, water, education and health initiatives.
ESG Disclosure and Reporting
In May, the Company disclosed its third disclosure under the Bill S-211, An Act to enact the Fighting Against
Forced Labour and Child Labour in Supply Chains Act, which came into force in Canada on January 1, 2024. The
report outlines measures taken in the 2025 reporting year to mitigate against the risk of forced labour and child
labour within the business and supply chain.
In May, the Company also released its 2025 Responsible Gold Mining Report (“RGMR”) titled Growing with
Purpose, the Company’s 11th annual disclosure of its performance associated with responsible mining. The
RGMR was prepared with reference to the Global Reporting Initiative Standards and the Sustainability Accounting
Standards Board Metals and Mining Sustainability Accounting Standard. It also includes energy and climaterelated data aligned with the Phase 1 recommendations of the Task Force on Climate-Related Financial
Disclosure, and water-related data that conforms with the Water Stewardship Framework established by the
International Council on Mining and Metals. Key highlights of the 2025 Report include:
•
Industry-leading safety performance with a lost-time injury frequency of 0.07 for employees and
contractors per million hours worked;
•
99% operational workforce from Mexico with 64% from Guerrero State and 39% from local communities;
voluntary turnover rate of 4%, down from 8% in 2024;
•
Zero reportable environmental incidents or spills;
•
$3.9 million directly invested in community development and infrastructure projects;
•
95% of procurement spend in Mexico up from 92% in 2024; 20% of spend directed to Guerrero-based
suppliers;
•
83% of water re-used and recycled; up from 58% in 2024 due to enhanced recycling capacity and water
circuits associated with the Media Luna Project;
•
68% reduction in Scope 1 greenhouse gas emissions relative to 2024, due to the transition from open pit
mining to underground operations together with other initiatives to reduce diesel consumption;
•
Completion and commissioning of a new 8.45-megawatt solar plant;
•
First disclosure of the Company’s Scope 3 GHG emissions inventory;
17
Torex Gold Resources Inc. | TSX: TXG
•
Ongoing conformance with the World Gold Council Responsible Gold Mining Principles and the
International Cyanide Management Code.
In June, the Company also released its 2025 Extractive Sector Transparency Measures Act (“ESTMA”) Report,
covering the Morelos Property in Guerrero as well as properties acquired in 2025 in Sinaloa, Chihuahua and
Nevada.
All of the aforementioned reports can be found under the ESG Reporting Portal on the Company’s website at
https://torexgold.com/responsible-mining-esg/esg-reporting-portal/.
DEVELOPMENT ACTIVITIES
Media Luna
During the quarter, $14.9 million (YTD - $23.1 million) of non-sustaining capital expenditures were incurred
primarily related to commissioning of the remaining electrical distribution system in the mine and the completion of
the final connection to the main 230kv substation. At the paste plant facility, which supplies paste backfill to the
stopes utilizing tailings, the planned installation of an operating spare positive displacement paste pump
progressed to further improve plant availability as well as the installation of an operating spare slurry tailings pump
feeding the paste plant. Work on additional mine support infrastructure continued in the second quarter of 2026,
which included a new underground service garage and warehouse, the east adit ventilation system to support the
life of mine plan, a water recycling facility, and extensions to the fire suppression systems.
Media Luna North Underground (formerly EPO Underground)
The development of the Media Luna North underground mine continued to track to plan in the second quarter,
with the objective of reaching first ore production in late 2026. Media Luna North will leverage infrastructure
associated with Media Luna, including the Guajes Tunnel and conveyor, ore handling system, process plant
upgrades, paste plant, as well as power and water infrastructure. Approximately 2,879 m of development of the
main access ramp and haulage drift was completed in the quarter, reflecting favorable ground conditions. A key
milestone was achieved as the new North adit breakthrough was completed, and following the quarter end, the
haulage drift breakthrough was achieved in July. The North adit excavation will subsequently allow for the
installation of new ventilation fans, providing additional ventilation supporting first ore production, as well as
continued progress of mine level development. Work commenced on other infrastructure elements within Media
Luna North such as the paste distribution system and the ventilation adit electrical room.
During the second quarter, efforts focused on expediting electrical, instrumentation, submersible pumps,
ventilation fans and steelwork to ensure delivery in support of construction activities which commenced in the
quarter. Procurement of bulk materials for construction such as cable and pipe supply also continued as
engineering details were finalized. Initial construction contracts to support mobilization of construction activities
related to the North adit and underground paste distribution system were awarded during the second quarter as
key areas of underground development advanced. Additionally, definition drilling programs targeted the initial
production stopes in anticipation of first production by late 2026.
During the second quarter of 2026, $12.0 million (YTD - $26.7) million of non-sustaining capital expenditures were
incurred relating to Media Luna North to support underground development and procurement to advance the
project. This continues to track in line with those estimated in the feasibility study which estimated $108 to
$113 million for the project overall (including $100 to $105 million guided in 2026) with expenditures expected to
pick up during the second half of 2026.
18
Torex Gold Resources Inc. | TSX: TXG
Los Reyes
With the acquisition of Prime Mining in the fourth quarter of 2025, the Company's portfolio of assets increased
with the addition of the Los Reyes project in Sinaloa, Mexico — a highly prospective, high grade, gold and silver
deposit. In the second quarter of 2026, work on the initial preliminary economic assessment (“PEA”) for the
project was completed and the Los Reyes project NI 43-101 Technical Report was released in July1.
During the second quarter, in addition to the finalization of the PEA report, key activities included the completion of
an updated Mineral Resource Estimate, a review of the options associated with the layout of site infrastructure
and a processing trade-off study related to production capacities, all of which will be further refined in the
prefeasibility study ("PFS") stage of the project, which commenced in July. Work also progressed on the detailed
plan outlining the strategy for completion of the PFS, including applicable trade-off studies and further site
investigations required to support the PFS technical deliverables. With the resumption of site access and drilling
activities, work will commence on the necessary field investigation program to advance the PFS study stage.
EXPLORATION AND DRILLING ACTIVITIES
The Company plans to invest a record $85.0 million in exploration and drilling in 2026 to conduct approximately
161,900 m of drilling across its portfolio of assets in Mexico and the United States (original guidance was
$77.0 million and 148,500 m of drilling). The revised forecast reflects $8.0 million of additional drilling (13,400 m)
within the Media Luna Cluster targeting the eastern and southern extensions of Media Luna given ongoing
positive results to date. The objective of the program is to sustain production, grow reserves, and advance highquality development opportunities.
During the second quarter, drilling activities at Morelos continued across ELG Underground, the Media Luna
Cluster, and at the regional target Atzcala, while drilling activities commenced at the regional target El Naranjo
early in the quarter. A key milestone during the second quarter was the resumption of drilling at the Los Reyes
project in Sinaloa, Mexico2.
Looking ahead, the exploration program at the Company’s early-stage exploration property Batopilas, in
Chihuahua, Mexico, is scheduled to commence in the fourth quarter, while drilling in Nevada, USA is expected to
begin at Gryphon in August, followed by Medicine Springs later in 2026.
Morelos
During the second quarter, a total of 7,280 m was drilled in 49 holes at ELG Underground, bringing the year-todate total to 17,751 m, equivalent to 49% of the 36,000 m planned for 2026. Drilling activities during the quarter
were primarily focused on resource delineation, with 4,402 m completed to upgrade Inferred Resources to the
Indicated category along the main mineralized trends, as well as 2,878 m of drilling at the El Limón Sur trend
targeting to extend mineralization toward the southern portion of the trend.
At the Media Luna Cluster, drilling during the second quarter was primarily focused on resource delineation at the
Media Luna mine and Media Luna North, testing the eastern and southern extensions of the Media Luna orebody,
and recommencing drilling at Media Luna West. The excellent results returned from drilling to the east of the main
Media Luna orebody have justified accelerating the drilling program in that region through an additional 13,400 m
of drilling planned for the remainder of 2026. As a result, the budget for drilling at the Media Luna Cluster has
increased to $26.0 million, targeting 75,900 m of drilling. Year-to-date, a total of 25,654 m of drilling has been
conducted across the Media Luna Cluster, representing 34% of the 2026 program, slightly behind plan given the
slower start to the year owing to a change of the drilling contractor. However, the Company remains on track to
complete the program by year end.
1 For more information on the Los Reyes Preliminary Economic Assessment, see the Company's news release titled "Torex Gold Releases Results of
Los Reyes Preliminary Economic Assessment" issued on July 7, 2026, and filed on SEDAR+ at www.sedarplus.ca and on the Company's website at
www.torexgold.com.
2 For more information on the Los Reyes drilling program, see the Company's news release titled "Torex Gold Restarts Drilling at Los Reyes Project"
issued on May 28, 2026, filed on SEDAR+ at www.sedarplus.ca and on the Company's website at www.torexgold.com.
19
Torex Gold Resources Inc. | TSX: TXG
Regionally, the drilling program at Atzcala continues to advance. Environmental permits to commence drilling at
the second priority target were received during the quarter and drill pad access and road construction were
completed. Drilling at the target commenced in July. At El Naranjo, 2,312 m of drilling was completed during the
quarter, with initial results confirming the presence of shallow, low-grade oxidized gold mineralization and
indicating that the epithermal mineralization system becomes increasingly well-developed toward the northern
part of the target. A total of 15,000 m of drilling is planned for this year at both regional targets.
Los Reyes
At Los Reyes, drilling resumed in late-May, with approximately 20,000 m planned for the 2026 exploration
program. The program is focused on de-risking and upgrading mineral resources across the project's three
principal areas - Guadalupe, Z-T, and Central. Directional drilling will be utilized to maximize drilling efficiency,
optimize metreage, and reduce the number of drill platforms required.
In parallel, historical drill core will be systematically re-logged for geological and geotechnical characteristics,
complemented by approximately 25,000 m of hyperspectral core scanning. These datasets will support the
development of updated resource estimation and geometallurgical domain models.
Early-Stage Exploration Properties
In Nevada, prioritization of drill targets is nearly complete at Gryphon, and progress is being made in delineating
the two-highest ranked targets where drilling will commence in August. At Medicine Springs, district-scale
geological mapping has been completed, and the structural architecture has been defined. District-scale
geochemical surveys are now underway and will be followed by geophysical surveys to support the delineation
and ranking of the highest-priority drill targets to be drilled in September.
In Chihuahua, the exploration program at Batopilas completed local-scale delineation of the four defined target
areas. Based on the identified geological criteria, two conceptual targets were validated and prioritized for drill
testing in the fourth quarter. At Guigui, three targets have been mapped at 1:5,000 scale and key geological
criteria are being validated. Various field activities are also underway at Guigui including detailed geological
mapping, geochemistry, spectrometry, and re-logging of historical drill holes.
In June, the Company completed the process of bringing the La Gloria property in Sonora, Mexico, into good
standing, which included paying outstanding duties and other requirements. The property was acquired through
the Company’s acquisition of Reyna Silver in August 2025. The La Gloria property is located in close proximity to
the past producing El Chanate mine and the producing Herradura mine. The property covers over 24,000
hectares (across four concessions) and was last drilled by Reyna Gold between 2022 and 2024.
20
Torex Gold Resources Inc. | TSX: TXG
Table 7.
In millions of U.S. dollars
ELG Cluster
ELG infill and step-out drilling
ELG drilling
Media Luna Cluster
Media Luna infill and step-out drilling
Media Luna North infill and step-out drilling
Media Luna drilling
Media Luna North drilling
Media Luna Cluster drilling
Other Morelos exploration and drilling
Morelos support costs4
Capital support costs
Operating support costs
Total Morelos
Los Reyes drilling and project study costs
Gryphon and Medicine Springs exploration
and drilling
Batopilas and Guigui exploration and drilling
Other exploration and support costs
Total5
1.
2.
3.
4.
5.
Total Q2
2026 YTD
Expenditure
Forecast
2026
Expenditure
Total
2025
Expenditure
Capitalized1 $
Expensed2 $
3.8
0.3
9.0
1.0
9.8
0.4
Capitalized1 $
Capitalized3 $
Expensed2 $
Capitalized3 $
Expensed2 $
Expensed2 $
1.5
0.8
0.2
–
7.4
3.4
5.0
2.0
2.0
–
17.0
7.0
2.0
–
0.6
7.9
19.1
7.3
Capitalized3 $
Expensed2 $
$
Expensed2 $
0.1
3.3
20.8
3.7
–
8.0
51.0
18.0
–
–
47.1
–
Expensed2 $
2.0
12.0
–
Expensed2 $
Expensed2 $
$
0.9
–
27.4
4.0
–
85.0
–
7.8
54.9
Expenditure
Classification
Included in sustaining capital expenditures.
Included in exploration and evaluation expenses as reported on the Condensed Consolidated Interim Statements of Operations and
Comprehensive Income.
Included in non-sustaining capital expenditures.
Morelos support costs are reported separately for 2026 guidance. For the years ended December 31, 2025 and 2024, support costs were reported
within the respective programs.
Excludes definition and grade control drilling costs.
21
Torex Gold Resources Inc. | TSX: TXG
FINANCIAL CONDITION REVIEW
Summary of the Condensed Consolidated Interim Statements of Financial Position
The following table summarizes key financial position items as at June 30, 2026:
Table 8.
In millions of U.S. dollars
Jun 30,
2026
Dec 31,
2025
169.4 $
62.4
37.7
189.5
238.9
2,349.0
32.6
3,079.5 $
119.5
65.3
72.8
190.5
214.7
2,319.4
43.2
3,025.4
190.6
171.0
27.6
105.6
73.2
2.7
28.1
598.8
2,426.6
Cash and cash equivalents
Value-added tax receivables
Trade receivables
Inventory
Deferred income tax assets
Property, plant and equipment
Other assets
Total assets
$
Accounts payable and accrued liabilities
Income taxes payable
Debt
Lease-related obligations
Decommissioning liabilities
Deferred income tax liabilities
Other liabilities
Total liabilities
$
$
182.9 $
143.5
–
99.4
72.7
–
4.1
502.6 $
Total shareholders’ equity
$
2,576.9 $
$
Cash and cash equivalents
The Company ended the second quarter of 2026 with cash and cash equivalents of $169.4 million. The Company
primarily holds cash balances in U.S dollars but also holds accounts in Canadian dollars and Mexican pesos for
operating and administrative purposes.
Value-added tax (“VAT”) receivables
VAT receivables decreased by $2.9 million compared to December 31, 2025, primarily as a result of recoveries
exceeding VAT paid. The VAT receivables balance fluctuates as additional VAT is paid and refunds are received,
as well as with the movement of the Mexican peso exchange rate relative to the U.S. dollar and any provisions. As
at June 30, 2026, the VAT receivables of $62.4 million comprises $60.3 million in current assets and $2.1 million
in non-current assets.
Trade receivables
The decrease in trade receivables of $35.1 million compared to December 31, 2025, is primarily due to the timing
of sales and receipts, as well as provisional price adjustments on outstanding receivables.
22
Torex Gold Resources Inc. | TSX: TXG
Inventory
The decrease in inventory of $1.0 million is primarily due to lower finished goods due to the timing of production
and sales, partially offset by a higher cash cost per ounce in inventory.
Deferred income tax assets
The deferred tax asset primarily relates to tax pools and temporary differences in Mexico. The increase in the
deferred tax asset is primarily driven by the tax effect of currency translation on the tax base, coupled by higher
depreciation for accounting than for tax purposes, which on a net basis increased the difference between the book
value and tax value of the assets in the determination of deferred tax.
Property, plant and equipment
Property, plant and equipment increased primarily due to additions of $132.2 million, partially offset by
depreciation of $100.4 million. Refer to Table 12 for a breakdown of capital expenditures for the six months ended
June 30, 2026.
Other assets
The other assets balance includes prepaid expenses, advances and deposits, derivative contract assets and
lease-related assets. The decrease in other assets is primarily due to lower lease-related assets, partially offset by
higher derivative assets.
Accounts payable and accrued liabilities
Accounts payable and accrued liabilities decreased by $7.7 million compared to December 31, 2025, primarily
due to the settlement of share-based compensation liabilities with the annual vesting of awards in January 2026,
the payment of the 1% royalty for 2025 and mine concession payments during March and settlement of the
statutory Mexican employee profit-sharing obligation ("PTU") relating to 2025. These decreases were largely
offset by an increase in trade payables due to the timing of supplier invoices and payments, increased accrued
liabilities at Media Luna and advances for carbon fine purchases.
Income taxes payable
The decrease in the balance is primarily due to corporate income tax payments of $140.8 million and an 8.5%
Mexican mining tax payment of $52.5 million (paid in the first quarter of 2026 in respect of 2025), partially offset
by current income tax expense of $164.9 million.
Debt
In the first quarter of 2026, the Company fully repaid the balance drawn on the Debt Facility.
Lease-related obligations
The decrease in lease-related obligations is primarily due to principal repayments during the first half of 2026,
partially offset by the commencement of new leases. As at June 30, 2026, the lease-related obligations of $99.4
million comprises $25.1 million in current liabilities and $74.3 million in non-current liabilities.
Decommissioning liabilities
Decommissioning liabilities increased marginally primarily driven by the accretion on the discounted obligation. As
at June 30, 2026, the decommissioning liabilities of $72.7 million are presented as non-current liabilities.
Other liabilities
Other liabilities largely relates to a non-current share-based compensation liability of $4.0 million.
23
Torex Gold Resources Inc. | TSX: TXG
DEBT FINANCING
Debt Facility
On June 25, 2025, the Company and one of its Mexican subsidiaries, Minera Media Luna, S.A. de C.V. (“MML”),
(as co-borrowers) executed an amended and restated credit agreement, the Sixth Amended and Restated Credit
Agreement (the “Amendment”) with the Bank of Montreal, Bank of Nova Scotia, Canadian Imperial Bank of
Commerce, ING Bank N.V. and National Bank of Canada, increasing the capacity of the Debt Facility from
$300.0 million to $350.0 million. The Debt Facility includes an accordion feature for an additional $200.0 million
(prior to June 25, 2025 - $150.0 million) in available capacity at the discretion of the lenders.
On July 6, 2026, the Company and MML entered into a First Amending Agreement to the Sixth Amended and
Restated Credit Agreement (the "Amendment"). The Amendment extends the maturity of the Company's
$350.0 million Debt Facility to June 25, 2030, revises certain financial covenants to provide improved financial
terms, including revisions to the maximum permitted net leverage ratio and the removal of the minimum tangible
net worth covenant, and maintains the $200.0 million accordion feature.
The Debt Facility incorporates Sustainability-Linked Loan (“SLL”) targets, which integrate ESG performance
measures. The SLL includes incentive pricing terms related to achieving various Sustainability Performance
Targets (“SPTs”) including those in safety, climate change, alignment with the World Gold Council’s Responsible
Gold Mining Principles ("RGMPs") and sustainable water management. The SPTs are aligned with the Company’s
sustainability targets.
The Debt Facility bears interest at a rate of Term SOFR (subject to a zero floor), a forward-looking term rate
based on SOFR, plus a credit spread adjustment and an applicable margin based on the Company's leverage
ratio. The credit spread adjustment is 0.10%. As at June 30, 2026, the applicable margin would be 2.25%
(December 31, 2025 - 2.25%). As a result of the Amendment, the applicable margin applied from July 6, 2026 will
be 1.88% to 3.0% (previously 2.25%-3.25%) based on a leverage ratio. Based on the leverage ratio as at June
30, 2026, the facility applicable margin will be 1.88%.
In the first quarter of 2026, the Company fully repaid the outstanding $30.0 million, net on the Debt Facility. As at
June 30, 2026, the Debt Facility was fully undrawn and the Company had utilized $13.1 million for letters of credit,
reducing the available credit of the Debt Facility to $336.9 million (December 31, 2025 - $30.0 million drawn,
$13.2 million and $306.8 million, respectively).
The Debt Facility permits spending for general corporate and working capital purposes and to facilitate the
development of existing and future projects of the Company. The Debt Facility is subject to conditions, including
compliance with financial covenants related to maintaining a net leverage ratio of less than or equal to 3.5 and an
interest coverage ratio of greater than or equal to 3.0. Prior to the Amendment, it was also subject to a covenant
on tangible net worth of $1.0 billion plus 50% of positive quarterly net income from January 1, 2024. As at June
30, 2026, the Company was in compliance with the financial and other covenants under the Debt Facility.
The Debt Facility is secured by all of the material assets of the Company and its material subsidiaries, which
currently are its subsidiaries with a direct or indirect interest in the Morelos Complex.
LIQUIDITY AND CAPITAL RESOURCES
The total assets of the Company as at June 30, 2026 were $3,079.5 million (December 31, 2025 $3,025.4 million), which includes $169.4 million in cash and cash equivalents (December 31, 2025 $119.5 million).
Net cash generated from operating activities before changes in non-cash operating working capital was
$339.3 million in the first half of 2026, compared to $77.6 million in the first half of 2025. The increase in net cash
generated from operating activities before changes in non-cash operating working capital of $261.7 million is
24
Torex Gold Resources Inc. | TSX: TXG
largely due to a higher average realized gold price and higher gold equivalent ounces sold, partially offset by
higher income taxes paid, higher production costs and royalties, and an increase for the cash settlement of sharebased compensation.
Net cash used in investing activities in the first half of 2026 was $105.1 million compared to $212.9 million in the
first half of 2025. Net cash used in investing activities was lower primarily due to lower Media Luna capitalized
expenditures, partially offset by higher capital expenditures related to Media Luna North.
Net cash used in financing activities in the first half of 2026 primarily related to share repurchases of
$155.0 million, repayments on the Debt Facility of $30.0 million, dividends paid of $21.2 million, lease principal
payments of $10.7 million, and other borrowing costs paid of $10.1 million. The net cash generated from financing
activities for the comparative period primarily related to proceeds from the Debt Facility of $165.0 million, net,
partially offset by lease principal payments of $7.3 million and other borrowing costs paid of $9.3 million.
The Company has no debt outstanding as at June 30, 2026 and has $336.9 million available under the Debt
Facility with $13.1 million utilized for letters of credit. Subsequent to June 30, 2026, the Company entered into the
First Amending Agreement to its Sixth Amended and Restated Credit Agreement. Under the amended agreement,
the $350.0 million Debt Facility matures on June 25, 2030, has no commitment reductions prior to maturity, and
can be repaid in full anytime without penalty.
In 2023, the Company executed purchase agreements with suppliers for the primary production equipment,
underground support equipment and personnel transport equipment for operations at Media Luna. These
purchases were subsequently assigned to financiers who own the equipment once delivered by the suppliers and
then lease the equipment to the Company. In connection with advanced payments made by the financiers to the
suppliers ahead of equipment being delivered, the Company executed interest-bearing promissory notes, of which
$2.4 million remain outstanding as at June 30, 2026 (December 31, 2025 - $16.7 million). In addition, lease
obligations include $76.6 million of leases for this equipment as at June 30, 2026
(December 31, 2025 - $69.4 million).
As at June 30, 2026, the Company’s contractual obligations included TOAs with certain Ejidos and individual
landowners; and contractual commitments related to the purchases of goods, energy and services used in the
operations at the Morelos Complex. All TOAs can be terminated within one year at the Company’s discretion at
any time without penalty.
Production revenue from certain concessions is subject to a 2.5% royalty payable to the Mexican Geological
Survey agency. The royalty is accrued based on revenue and is payable on a quarterly basis. For the six months
ended June 30, 2026, the Company paid $25.6 million for the 2.5% royalty relating to the fourth quarter of 2025
and the first quarter of 2026 (six months ended June 30, 2025 - $10.9 million relating to the fourth quarter of 2024
and the first quarter of 2025). As at June 30, 2026, the Company accrued $10.1 million for the 2.5% royalty
relating to the second quarter of 2026, which was paid in July 2026 (December 31, 2025 - $11.6 million relating to
the fourth quarter of 2025, which was paid in January 2026).
The Company is subject to a mining tax of 8.5% on taxable earnings before the deduction of taxes, interest,
depreciation and amortization, and a royalty of 1.0% on sales of gold, silver and platinum. Both the mining tax and
royalty are payable to the Servicio de Administración Tributaria on an annual basis in March of the following year.
In March 2026, the Company paid $64.6 million in respect of the 8.5% and 1.0% mining tax and royalty for 2025
(paid in March 2025 - $39.4 million for 2024). As at June 30, 2026, the Company had accrued $44.5 million and
$8.0 million for the 8.5% and 1.0% mining tax and royalty, respectively, to be paid in March 2027
(December 31, 2025 - $53.6 million and $12.0 million, respectively).
Production is expected to increase through the second half of 2026 as mined grades and gold recoveries are
expected to improve through the third and fourth quarters. Given the timing of tax and employee profit sharing
payments, the Company’s net cash generated from operating activities is generally weighted towards the second
half of the year as was the case in 2025 and 2024.
The trends that affect the Company’s liquidity are further described in the “Economic Trends” section of this
MD&A.
25
Torex Gold Resources Inc. | TSX: TXG
For discussion of liquidity risks, refer to sections “Financial Risk Management” and “Risks and Uncertainties” of
this MD&A.
Contractual Commitments
Table 9.
In millions of U.S. dollars
Operating commitments1
Capital commitments1
Accounts payable and accrued liabilities
Derivative contracts
Lease-related obligations
Total
1.
$
$
$
$
$
$
Total
445.8
92.3
182.9
0.1
119.4
840.5
Payments Due by Period
Less Than
Greater Than
1 Year 1-3 Years 4-5 Years
5 Years
261.5
173.8
10.5
–
83.9
7.7
0.7
–
182.9
–
–
–
–
0.1
–
–
33.2
52.0
27.0
7.2
561.5
233.6
38.2
7.2
Certain contractual commitments may contain cancellation clauses; however, the Company discloses its commitments based on management’s
intent to fulfill the contracts.
During the year ended December 31, 2024, the Company entered into a power purchase agreement for the
delivery of 236,520 megawatt hours of electricity per year over a period of five years, at a fixed rate per megawatt
hour, subject to annual inflation adjustments. Delivery under the power purchase agreement commenced in
December 2024. As at June 30, 2026, the agreement is accounted for as an executory contract on the basis that
the contract is held for the purpose of the receipt of a non-financial item in accordance with the expected
electricity usage by the Company over the contract term. Included in operating commitments as at June 30, 2026
is $68.3 million relating to the power purchase agreement.
OUTSTANDING SHARE DATA
Table 10.
Outstanding Share Data as at August 6, 2026
Torex Shares
Restricted share units2
Performance share units3
Stock options assumed pursuant to the Prime Mining acquisition4
Warrants assumed pursuant to the Prime Mining acquisition5
1.
2.
3.
Number1
92,594,592
295,198
503,586
115,049
8,820
In addition to the above, the Company has 4,541 deferred share units (“DSUs”) outstanding. The DSUs are cash settled and therefore they have
been excluded from the outstanding share data as at August 6, 2026.
The balance includes both Restricted Share Units (“RSUs”) and Employee Restricted Share Units (“ERSUs”) issued under the Restricted Share
Plan (“RSU Plan”) and the Employee Share Unit (“ESU Plan”), respectively. Each restricted share unit is redeemable for one (i) Torex Share or (ii)
its cash equivalent, less applicable tax withholdings.
The number of performance share units that vest is determined by multiplying the number of units granted to the participant, and outstanding at
the vesting date, by an adjustment factor, which ranges from 0 to 2.0. Therefore, the number of units that will vest and be settled may be higher or
lower than the number of units originally granted to a participant. The adjustment factor is based on the Company’s total shareholder return relative
to a group of comparable companies over the applicable period. Under the terms of the plan, the Board of Directors is authorized to determine the
adjustment factor.
As of January 1, 2022, the Company ceased the issuance of new stock options and the plan was terminated in March 2025 as the last of the
outstanding options were exercised. On October 22, 2025, Torex acquired Prime Mining which resulted in adjustments to the stock options
assumed pursuant to the Prime Mining acquisition. A Prime Mining stock option holder is entitled to receive 0.060 of a Torex Share for each Prime
Mining share that was issuable upon the exercise of such Prime Mining stock options (rounded down to the nearest whole number). Based on the
number of outstanding Prime Mining stock options on October 21, 2025, there were 358,643 Torex Shares issuable upon the exercise of such
options at an exercise price equal to the exercise price of the Prime Mining stock options divided by 0.060 (rounded up to the nearest whole cent).
On October 22, 2025, Torex acquired Prime Mining which resulted in adjustments to the warrants assumed pursuant to the Prime Mining
acquisition. A warrant holder is entitled to receive 0.060 of a Torex Share for each Prime Mining share that was issuable upon the exercise of such
warrants (rounded down to the nearest whole number). Based on the number of outstanding Prime Mining warrants on October 21, 2025, there
were 14,301 Torex Shares issuable upon the exercise of such warrants.
26
Torex Gold Resources Inc. | TSX: TXG
Normal course issuer bid
On November 18, 2024, the Company received approval from the TSX of its notice of intention to commence a
normal course issuer bid (“NCIB”). Under the NCIB, the Company was authorized to purchase up to 7,116,777
Torex Shares, representing approximately 10% of the public float as of November 13, 2024, during the period
commencing on November 21, 2024 and ending on November 20, 2025. The Company purchased 551,102 Torex
Shares at an average price of $38.65 (C$54.04) during this period.
On November 19, 2025, the Company received approval from the TSX of its notice of intention to renew its NCIB
and is authorized to purchase up to 8,133,430 Torex Shares, representing approximately 10% of the public float
as of November 11, 2025, during the period commencing on November 21, 2025 and ending on November 20,
2026. Under the current NCIB, daily purchases are limited to 101,788 Torex Shares, representing 25% of the
average daily trading volume of Torex Shares on the TSX for the six-month period ended October 31, 2025 (being
407,154 Torex Shares), except where purchases are made in accordance with the “block purchase exemption” of
the TSX rules. The Company will purchase Torex Shares in open market transactions through the facilities of the
TSX or alternative trading systems at the representative market price at the time of purchase. All Torex Shares
that are repurchased by the Company under the NCIB will be canceled. Securityholders can obtain, without
charge, a copy of the notice of intention filed with the TSX by contacting the Company.
During the three and six months ended June 30, 2026, the Company repurchased 990,982 and 3,132,783 Torex
Shares, respectively, for $44.2 million (C$61.3 million) and $155.0 million (C$212.8 million), respectively, at an
average price per share of $44.57 (C$61.89) and $49.47 (C$67.91), respectively. The book value of the cancelled
shares of $45.4 million was recognized as a reduction to share capital, with the remaining $112.5 million
recognized as a reduction to retained earnings in the Condensed Consolidated Interim Statements of Financial
Position. No Torex Shares were repurchased or cancelled during the first half of 2025.
Dividends
On November 5, 2025, the Company’s Board of Directors declared an inaugural quarterly dividend of C$0.15 per
Torex Share. In February 2026, the Board declared a quarterly dividend of C$0.15 per Torex Share and in May
2026, declared a quarterly dividend of C$0.16 per Torex Share.
During the three and six months ended June 30, 2026, the Company paid dividends of $10.8 million and
$21.2 million respectively, which are included in net cash used in financing activities in the Consolidated
Statements of Cash Flows (three and six months ended June 30, 2025 - $nil). In August 2026, the Company
declared a quarterly dividend of C$0.16 per Torex Share, payable on September 4, 2026, to shareholders of
record on August 21, 2026.
NON-GAAP FINANCIAL PERFORMANCE MEASURES
The Company has presented certain non-GAAP financial measures in this MD&A which include: total cash costs,
all-in sustaining costs, all-in sustaining costs margin, sustaining and non-sustaining capital expenditures, average
realized gold price, adjusted net earnings, adjusted net earnings per share, EBITDA, adjusted EBITDA, free cash
flow, net cash (debt), available liquidity and unit cost measures. The Company believes that these measures,
while not a substitute for measures of performance prepared in accordance with IFRS, provide investors with an
improved ability to evaluate the underlying performance of the Company. These measures do not have any
standardized meaning prescribed under IFRS, and, therefore, may not be comparable to other issuers.
Total Cash Costs
Total cash costs is a common financial measure in the gold mining industry; however, it has no standardized
meaning under IFRS and as such, it may not be comparable to similar financial measures disclosed by other
issuers. The Company reports total cash costs on both a by-product basis (per oz sold) and a gold equivalent
basis (per oz AuEq sold). The Company believes that, in addition to conventional measures prepared in
accordance with IFRS, such as costs of sales and net cash generated from operating activities, certain investors
use this information to evaluate the Company’s performance. Management uses this metric as an important tool
27
Torex Gold Resources Inc. | TSX: TXG
to monitor operating costs. Total cash costs on a by-product basis are calculated as production costs, excluding
temporary suspension costs where applicable, and royalties, less by-product credits and including treatment,
refining and other cost deductions. Total cash costs on a gold equivalent basis are calculated as production costs,
excluding temporary suspension costs where applicable, royalties, and treatment, refining and other cost
deductions. Total cash costs on both a by-product basis and a gold equivalent basis are adjusted for realized
(gains) losses on foreign currency contracts where applicable. For 2025 and 2026, the Company’s foreign
currency contracts were entered into to manage the foreign currency risk on operating expenditures and therefore
are adjusted in total cash costs.
All-In Sustaining Costs (“AISC”)
AISC is a common financial measure in the gold mining industry; however, it has no standardized meaning under
IFRS and as such, it may not be comparable to similar financial measures disclosed by other issuers. The
Company believes that, in addition to conventional measures prepared in accordance with IFRS, such as cost of
sales and net cash generated from operating and investing activities, certain investors use this information to
evaluate the Company’s operating performance and its ability to generate free cash flow from current operations.
Management uses this metric as an important tool to monitor operating and capital costs. In addition, the
Compensation Committee of the Board of Directors uses certain of these measures, together with other
measures, to set incentive compensation goals and assess performance.
Torex reports AISC in accordance with the guidance issued by the World Gold Council (“WGC”) in 2018. The
WGC definition of AISC seeks to extend the definition of total cash costs by adding corporate general and
administrative costs, reclamation and remediation costs (including accretion and amortization), sustaining
exploration and study costs, capitalized stripping costs, sustaining capital expenditures and sustaining leases, and
represents the total costs of producing gold from current operations. Non-sustaining capital expenditures are
primarily those related to new operations and major projects at existing operations that are expected to materially
benefit the current operation. The determination of classification of sustaining versus non-sustaining requires
judgement by management. AISC excludes income tax payments, interest costs, costs related to business
acquisitions, costs related to growth projects and other expenses not related to ongoing operations.
Consequently, these measures are not representative of all of the Company’s cash expenditures. In addition, the
calculation of AISC does not include depreciation and amortization expense as it does not reflect the impact of
expenditures incurred in prior periods. Therefore, it is not indicative of the Company’s overall profitability. Other
companies may quantify these measures differently because of different underlying principles and policies
applied. Differences may also occur due to different definitions of sustaining versus non-sustaining capital.
28
Torex Gold Resources Inc. | TSX: TXG
Reconciliation of Total Cash Costs and All-in Sustaining Costs to Production Costs and Royalties
The following table provides a reconciliation of total cash costs and all-in sustaining costs to production costs and
royalties as per the Condensed Consolidated Interim Statements of Operations and Comprehensive Income:
Table 11.
In millions of U.S. dollars, unless otherwise noted
Gold sold
Total cash costs per oz sold
Production costs
Royalties
Silver credits1
Copper credits1
Treatment, refining and other cost
deductions
Realized gain on foreign currency
contracts
Total cash costs
Total cash costs per oz sold
All-in sustaining costs per oz sold
Total cash costs
General and administrative costs2
Reclamation and remediation costs
Sustaining capital expenditure3
Total all-in sustaining costs
Total all-in sustaining costs per oz
sold
oz
Six Months Ended
Jun 30,
Jun 30,
2026
2025
149,291
123,249
$
$
$
$
166.2
13.4
(30.9)
(80.6)
151.3
19.0
(47.2)
(88.8)
115.1
8.6
(10.2)
(33.4)
317.5
32.4
(78.1)
(169.4)
171.3
14.6
(11.3)
(34.6)
$
(1.4)
(2.4)
1.2
(3.8)
1.2
$
(1.6)
(0.4)
(1.4)
(2.0)
(1.8)
$
$/oz
65.1
957
31.5
388
79.9
1,258
96.6
647
139.4
1,131
$
$
$
$
$
65.1
9.5
1.9
39.1
115.6
31.5
10.2
2.0
29.7
73.4
79.9
7.8
1.1
29.4
118.2
96.6
19.7
3.9
68.8
189.0
139.4
16.5
2.1
43.0
201.0
$/oz
1,699
904
1,862
1,266
1,631
92,351
109,222
76,922
201,573
137,490
166.2
13.4
151.3
19.0
115.1
8.6
317.5
32.4
171.3
14.6
(1.4)
(2.4)
1.2
(3.8)
1.2
(1.6)
(0.4)
(1.4)
(2.0)
(1.8)
176.6
1,912
167.5
1,534
123.5
1,606
344.1
1,707
185.3
1,348
176.6
9.5
1.9
39.1
227.1
167.5
10.2
2.0
29.7
209.4
123.5
7.8
1.1
29.4
161.8
344.1
19.7
3.9
68.8
436.5
185.3
16.5
2.1
43.0
246.9
2,459
1,917
2,103
2,165
1,796
Gold equivalent sold4
oz AuEq
Total cash costs per oz AuEq sold
Production costs
$
Royalties
$
Treatment, refining and other cost
$
deductions
Realized gain on foreign currency
$
contracts
Total cash costs
$
4
Total cash costs per oz AuEq sold
$/oz AuEq
All-in sustaining costs per oz AuEq
sold
Total cash costs
$
2
General and administrative costs
$
Reclamation and remediation costs
$
3
Sustaining capital expenditure
$
Total all-in sustaining costs
$
Total all-in sustaining costs per oz
$/oz AuEq
AuEq sold4
1.
Three Months Ended
Jun 30,
Mar 31,
Jun 30,
2026
2026
2025
68,058
81,233
63,493
Includes provisional price adjustments on sales of copper concentrate and precipitate.
29
Torex Gold Resources Inc. | TSX: TXG
This amount excludes a gain of $0.8 million, loss of $1.2 million and loss of $6.2 million for the three months ended June 30, 2026, March 31,
2026, and June 30, 2025, respectively, and a loss of $0.4 million and loss of $13.8 million for the six months ended June 30, 2026 and June 30,
2025, respectively, in relation to the remeasurement of share-based payments. This amount also excludes corporate depreciation and amortization
expenses totalling $nil, $0.1 million and $nil for the three months ended June 30, 2026, March 31, 2026, and June 30, 2025, respectively, $0.1
million and $0.1 million for the six months ended June 30, 2026 and June 30, 2025, respectively, within general and administrative costs. Included
in general and administrative costs is share-based compensation expense in the amount of $2.0 million or $29/oz ($22/oz AuEq) for the three
months ended June 30, 2026, $2.3 million or $28/oz ($21/oz AuEq) for the three months ended March 31, 2026, $1.8 million or $28/oz ($23/oz
AuEq) for the three months ended June 30, 2025, $4.3 million or $29/oz ($21/oz AuEq) for the six months ended June 30, 2026 and $4.1 million or
$33/oz ($30/oz AuEq) for the six months ended June 30, 2025.
Sustaining capital expenditures includes lease payments (principal and interest) of $7.8 million, $7.7 million and $4.8 million for the three months
ended June 30, 2026, March 31, 2026, and June 30, 2025, respectively, and $15.5 million and $5.6 million for the six months ended June 30,
2026 and June 30, 2025, respectively.
Gold equivalent ounces produced and sold include production of silver and copper converted to a gold equivalent based on a ratio of the average
market prices for each commodity sold in the period. Refer to “Gold Equivalent Reporting” for the relevant average market prices by commodity.
Reconciliation of Sustaining and Non-Sustaining Capital Expenditures to Additions to Property, Plant and
Equipment
The following table provides a reconciliation of capital expenditures to additions to property, plant and equipment
as reported in the Condensed Consolidated Interim Statements of Cash Flows:
Table 12.
In millions of U.S. dollars
Sustaining
Lease payments (sustaining)
Total sustaining
Non-sustaining
Media Luna Project1
Media Luna North Project
Media Luna North drilling
Working capital changes and other
Capital expenditures2
1.
2.
$
$
$
Three Months Ended
Jun 30,
Mar 31,
Jun 30,
2026
2026
2025
31.3
22.0
24.6
7.8
7.7
4.8
39.1
29.7
29.4
$
$
$
$
$
14.9
12.0
2.9
(7.2)
61.7
8.2
14.7
3.1
(7.1)
48.6
48.9
4.5
1.9
16.1
100.8
Six Months Ended
Jun 30,
Jun 30,
2026
2025
53.3
37.4
15.5
5.6
68.8
43.0
23.1
26.7
6.0
(14.3)
110.3
104.4
8.5
2.1
66.3
224.3
Non-sustaining capital expenditures includes lease payments (principal and interest) of $nil, $nil and $1.1 million for the three months ended June
30, 2026, March 31, 2026, and June 30, 2025, respectively, and $nil and $5.1 million for the six months ended June 30, 2026 and June 30, 2025,
respectively.
The amount of cash expended on additions to property, plant and equipment in the period as reported in the Condensed Consolidated Interim
Statements of Cash Flows.
Average Realized Gold Price
Average realized gold price on a by-product basis (per oz sold) and a gold equivalent basis (per oz AuEq sold) are
non-GAAP financial measures that do not have a standardized meaning under IFRS and as such, they may not
be comparable to similar financial measures disclosed by other issuers. Management and certain investors use
these measures to better understand the gold price and margin realized throughout a period.
Average realized gold price on a by-product basis is calculated as revenue per the Condensed Consolidated
Interim Statements of Operations and Comprehensive Income, less silver credits and copper credits, adjusted for
treatment, refining and other cost deductions and realized gains (losses) on gold contracts and gold QP Hedges
where applicable, divided by ounces of gold sold. Average realized gold price on a gold equivalent basis is
calculated as revenue per the Condensed Consolidated Interim Statements of Operations and Comprehensive
Income, adjusted for treatment, refining and other cost deductions and realized gains (losses) on gold contracts
and QP Hedges where applicable, divided by ounces of gold equivalent sold.
30
Torex Gold Resources Inc. | TSX: TXG
Reconciliation of Average Realized Gold Price to Revenue
The following table provides a reconciliation of average realized gold price on a by-product basis (per oz sold) and
a gold equivalent basis (per oz AuEq sold) to revenue as per the Condensed Consolidated Interim Statements of
Operations and Comprehensive Income:
Table 13.
In millions of U.S. dollars, unless otherwise noted
Three Months Ended
Jun 30,
Mar 31,
Jun 30,
2026
2026
2025
68,058
81,233
63,493
Six Months Ended
Jun 30,
Jun 30,
2026
2025
149,291
123,249
Gold sold
oz
Revenue
Silver credits1
Copper credits1
Treatment, refining and other cost
deductions
Realized loss on gold contracts
Realized gain on gold QP Hedges
Total proceeds
Average realized gold price
$
$
$
406.9
(30.9)
(80.6)
539.3
(47.2)
(88.8)
253.9
(10.2)
(33.4)
946.2
(78.1)
(169.4)
423.9
(11.3)
(34.6)
$
(1.4)
(2.4)
1.2
(3.8)
1.2
$
$
$
$/oz
–
8.3
302.3
4,442
–
–
400.9
4,935
(1.3)
–
210.2
3,311
–
8.3
703.2
4,710
(2.1)
–
377.1
3,060
oz AuEq
92,351
109,222
76,922
201,573
137,490
$
406.9
539.3
253.9
946.2
423.9
$
(1.4)
(2.4)
1.2
(3.8)
1.2
$
$
$
$/oz AuEq
–
12.4
417.9
4,525
–
(14.4)
522.5
4,784
(1.3)
–
253.8
3,299
–
(2.0)
940.4
4,665
(2.1)
–
423.0
3,077
Gold equivalent sold2
Revenue
Treatment, refining and other cost
deductions
Realized loss on gold contracts
Realized gain (loss) on QP Hedges
Total proceeds
Average realized gold price
1.
2.
Includes provisional price adjustments on sales of copper concentrate and precipitate.
Gold equivalent ounces produced and sold include production of silver and copper converted to a gold equivalent based on a ratio of the average
market prices for each commodity sold in the period. Refer to “Gold Equivalent Reporting” for the relevant average market prices by commodity.
All-in Sustaining Costs Margin and All-in Sustaining Costs Margin Per Oz Sold
AISC margin and AISC margin on a by-product basis (per oz sold) and a gold equivalent basis (per oz AuEq sold)
are non-GAAP financial measures that do not have a standardized meaning under IFRS and as such, they may
not be comparable to similar financial measures disclosed by other issuers. Management and certain investors
use these measures to evaluate the Company’s performance and ability to generate operating income to fund its
capital investment and service its debt. AISC margin on a by-product basis is calculated as revenue per the
Condensed Consolidated Interim Statements of Operations and Comprehensive Income, less silver and copper
credits, and adjusted for treatment, refining and other cost deductions and realized gains (losses) on gold
contracts and QP Hedges where applicable, and AISC. AISC margin on a gold equivalent basis is calculated as
revenue per the Condensed Consolidated Interim Statements of Operations and Comprehensive Income, less
treatment, refining and other cost deductions, realized gains (losses) on gold contracts and QP Hedges where
applicable, and AISC. All-in sustaining costs margin per oz sold reflects the average realized gold price per oz
sold less all-in sustaining costs per oz sold on both a by-product and gold equivalent basis.
31
Torex Gold Resources Inc. | TSX: TXG
Reconciliation of All-in Sustaining Costs Margin to Revenue
The following table provides a reconciliation of all-in sustaining costs margin to revenue as per the Condensed
Consolidated Interim Statements of Operations and Comprehensive Income:
Table 14.
In millions of U.S. dollars, unless otherwise noted
Three Months Ended
Jun 30,
Mar 31,
Jun 30,
2026
2026
2025
68,058
81,233
63,493
Six Months Ended
Jun 30,
Jun 30,
2026
2025
149,291
123,249
Gold sold
oz
Revenue
Silver credits1
Copper credits1
Treatment, refining and other cost
deductions
Realized loss on gold contracts
Realized gain on gold QP Hedges
All-in sustaining costs
All-in sustaining costs margin
$
$
$
406.9
(30.9)
(80.6)
539.3
(47.2)
(88.8)
253.9
(10.2)
(33.4)
946.2
(78.1)
(169.4)
423.9
(11.3)
(34.6)
$
(1.4)
(2.4)
1.2
(3.8)
1.2
$
$
$
$
–
8.3
(115.6)
186.7
–
–
(73.4)
327.5
(1.3)
–
(118.2)
92.0
–
8.3
(189.0)
514.2
(2.1)
–
(201.0)
176.1
Average realized gold price
$/oz
4,442
4,935
3,311
4,710
3,060
Total all-in sustaining costs margin
Total all-in sustaining costs margin
$/oz
%
2,743
62
4,031
82
1,449
44
3,444
73
1,429
47
oz AuEq
92,351
109,222
76,922
201,573
137,490
$
406.9
539.3
253.9
946.2
423.9
$
(1.4)
(2.4)
1.2
(3.8)
1.2
$
$
$
$
–
12.4
(227.1)
190.8
–
(14.4)
(209.4)
313.1
(1.3)
–
(161.8)
92.0
–
(2.0)
(436.5)
503.9
(2.1)
–
(246.9)
176.1
Average realized gold price
$/oz AuEq
4,525
4,784
3,299
4,665
3,077
Total all-in sustaining costs margin2
Total all-in sustaining costs margin
$/oz AuEq
%
2,066
46
2,867
60
1,196
36
2,500
54
1,281
42
Gold equivalent sold2
Revenue
Treatment, refining and other cost
deductions
Realized loss on gold contracts
Realized gain (loss) on QP Hedges
All-in sustaining costs
All-in sustaining costs margin
Includes provisional price adjustments on sales of copper concentrate and precipitate.
Gold equivalent ounces produced and sold include production of silver and copper converted to a gold equivalent based on a ratio of the average
market prices for each commodity sold in the period. Refer to “Gold Equivalent Reporting” for the relevant average market prices by commodity.
Adjusted Net Earnings and Adjusted Net Earnings Per Share
Adjusted net earnings and adjusted net earnings per share (basic and diluted) are non-GAAP financial measures
that do not have a standardized meaning under IFRS and as such, they may not be comparable to similar
financial measures disclosed by other issuers. Management and certain investors use these metrics to measure
the underlying operating performance of the Company. Presenting these measures from period to period helps
management and investors evaluate earnings trends more readily in comparison with results from prior periods.
32
Torex Gold Resources Inc. | TSX: TXG
Adjusted net earnings is defined as net income adjusted to exclude specific items that are significant but not
reflective of the underlying operating performance of the Company, such as: temporary suspension costs where
applicable, the impact of unrealized foreign exchange (gains) losses, unrealized (gains) losses on derivative
contracts excluding QP Hedges, impairment losses, (gains) losses on remeasurement of share-based payments,
derecognition of provisions for uncertain tax positions, and the tax effect of currency translation on tax base, net of
the tax effect of these adjustments. Adjusted net earnings per share amounts are calculated using the weighted
average number of shares outstanding on a basic and diluted basis as determined under IFRS.
In the first quarter of 2026, the Company revised its calculation of adjusted net earnings by no longer removing
unrealized gains or losses on QP Hedges in the determination of adjusted net earnings. This improves
consistency with the Company's treatment of price adjustments on provisionally priced concentrate sales.
Unrealized gains or losses on other derivative contracts continue to be removed when determining adjusted net
earnings. The prior periods have been recast to conform with this change.
Reconciliation of Adjusted Net Earnings to Net Income
The following table provides a reconciliation of adjusted net earnings to net income as per the Condensed
Consolidated Interim Statements of Operations and Comprehensive Income:
Table 15.
Three Months Ended
Jun 30,
Mar 31,
Jun 30,
2026
2026
2025
In millions of U.S. dollars, unless
otherwise noted
Basic weighted average shares
outstanding
Diluted weighted average shares
outstanding
Six Months Ended
Jun 30,
Jun 30,
2026
2025
shares 93,363,973 95,313,769 86,205,585 94,333,485 86,165,940
shares 94,010,575 95,970,052 87,548,439 95,061,859 87,466,086
$
113.8
207.5
83.2
321.3
122.2
Unrealized foreign exchange (gain)
loss
$
(1.2)
(0.8)
2.4
(2.0)
1.7
Unrealized (gain) loss on derivative
contracts, excluding QP Hedges
$
(3.6)
0.1
(5.0)
(3.5)
(8.2)
(Gain) loss on remeasurement of
share-based payments
$
(0.8)
1.2
6.2
0.4
13.8
Derecognition of provisions for
uncertain tax positions
$
–
(12.7)
–
(12.7)
(9.2)
Tax effect of above adjustments
$
1.5
0.2
0.8
1.7
2.0
Tax effect of currency translation on
tax base
$
(24.8)
4.2
(43.8)
(20.6)
(42.6)
$
$/share
$/share
84.9
0.91
0.90
199.7
2.10
2.08
43.8
0.51
0.50
284.6
3.02
2.99
79.7
0.92
0.91
Net income
Adjustments:
Adjusted net earnings
Per share – Basic
Per share – Diluted
Earnings Before Interest, Taxes, Depreciation and Amortization (“EBITDA”) and Adjusted EBITDA
33
Torex Gold Resources Inc. | TSX: TXG
EBITDA and Adjusted EBITDA are non-GAAP financial measures that do not have a standardized meaning under
IFRS and as such, they may not be comparable to similar financial measures disclosed by other issuers. The
Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors
use these measures to evaluate the operating performance of the Company. Presenting these measures from
period to period helps identify and evaluate earnings trends more readily in comparison with results from prior
periods. EBITDA is defined as net income adjusted to exclude depreciation and amortization, net finance (income)
costs and income tax expense (recovery). Adjusted EBITDA is defined as EBITDA adjusted to exclude specific
items that are significant but not reflective of the underlying operating performance of the Company, such as:
temporary suspension costs (if applicable), the impact of unrealized foreign exchange (gains) losses, unrealized
(gains) losses on derivative contracts excluding QP Hedges, (gains) losses on remeasurement of share-based
payments, and certain impairment losses (if applicable).
In the first quarter of 2026, the Company revised its calculation of adjusted EBITDA by no longer removing
unrealized gains or losses on QP Hedges in the determination of adjusted EBITDA. This improves consistency
with the Company's treatment of price adjustments on provisionally priced concentrate sales. Unrealized gains or
losses on all other derivative contracts continue to be removed when determining adjusted EBITDA. The prior
periods have been recast to conform with this change.
Reconciliation of EBITDA and Adjusted EBITDA to Net Income
The following table provides a reconciliation of EBITDA and Adjusted EBITDA to net income as per the
Condensed Consolidated Interim Statements of Operations and Comprehensive Income:
Table 16.
In millions of U.S. dollars
Three Months Ended
Jun 30,
Mar 31,
Jun 30,
2026
2026
2025
113.8
207.5
83.2
Six Months Ended
Jun 30,
Jun 30,
2026
2025
321.3
122.2
Net income
$
Finance (income) costs and other, net
Depreciation and amortization1
Current income tax expense
Deferred income tax (recovery) expense
EBITDA
$
$
$
$
$
(0.7)
49.1
76.2
(29.3)
209.1
2.7
56.5
88.7
2.7
358.1
5.2
28.9
34.6
(37.8)
114.1
2.0
105.6
164.9
(26.6)
567.2
7.8
60.9
40.6
(29.3)
202.2
$
(3.6)
0.1
(5.0)
(3.5)
(8.2)
$
(1.2)
(0.8)
2.4
(2.0)
1.7
$
(0.8)
1.2
6.2
0.4
13.8
$
203.5
358.6
117.7
562.1
209.5
Adjustments:
Unrealized (gain) loss on derivative
contracts, excluding QP Hedges
Unrealized foreign exchange (gain) loss
(Gain) loss on remeasurement of sharebased payments
Adjusted EBITDA
1.
Includes depreciation and amortization included in cost of sales, general and administrative expenses and exploration and evaluation expenses.
Free Cash Flow
Free cash flow is a non-GAAP financial measure with no standardized meaning under IFRS and as such, it may
not be comparable to similar financial measures disclosed by other issuers. The Company defines free cash flow
as net cash generated from operating activities less cash outlays for capital expenditures, lease payments and
interest and other borrowing costs paid (including borrowing costs capitalized to property, plant and equipment),
as well as net changes in value-added tax receivables (non-cash working capital for investing activities). The
Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors
34
Torex Gold Resources Inc. | TSX: TXG
use this information to evaluate the Company’s operating performance and its ability to fund operating and capital
expenditures without reliance on additional borrowing.
Reconciliation of Free Cash Flow to Net Cash Generated from (used in) Operating Activities
The following table provides a reconciliation of free cash flow to net cash generated from (used in) operating
activities as reported in the Condensed Consolidated Interim Statements of Cash Flows:
Table 17.
Three Months Ended
Jun 30,
Mar 31,
Jun 30,
2026
2026
2025
167.6
209.8
67.8
In millions of U.S. dollars
Net cash generated from operating activities
Adjusted for:
Additions to property, plant and
equipment1
Value-added tax receivables, net2
Lease payments
Interest and other borrowing costs paid3
Free cash flow
1.
2.
3.
$
Six Months Ended
Jun 30,
Jun 30,
2026
2025
377.4
57.9
$
(61.7)
(48.6)
(100.8)
(110.3)
(224.3)
$
$
$
$
(0.4)
(5.3)
(6.0)
94.2
5.6
(5.4)
(4.1)
157.3
6.3
(3.9)
(6.9)
(37.5)
5.2
(10.7)
(10.1)
251.5
13.9
(7.3)
(11.0)
(170.8)
The amount of cash expended on additions to property, plant and equipment in the period as reported on the Condensed Consolidated Interim
Statements of Cash Flows.
Included in investing activities as reported on the Condensed Consolidated Interim Statements of Cash Flows.
Including borrowing costs capitalized to property, plant and equipment.
Net Cash (Debt)
Net cash (debt) is a non-GAAP financial measure with no standardized meaning under IFRS and as such, it may
not be comparable to similar financial measures disclosed by other issuers. Net cash (debt) is defined as total
cash and cash equivalents and short-term investments less lease-related obligations and debt, adjusted to
exclude unamortized deferred finance charges, at the end of the period. This measure is used by management,
and may be used by certain investors, to measure the Company’s debt leverage.
Reconciliation of Net Cash (Debt) to Cash and Cash Equivalents
The following table provides a reconciliation of net cash (debt) to cash and cash equivalents as reported in the
Condensed Consolidated Interim Statements of Financial Position:
Table 18.
$
Jun 30,
2026
169.4
Mar 31,
2026
130.0
Dec 31,
2025
119.5
Jun 30,
2025
103.0
$
$
$
$
–
(99.4)
–
70.0
–
(101.1)
–
28.9
(27.6)
(105.6)
(2.4)
(16.1)
(227.2)
(98.9)
(2.8)
(225.9)
In millions of U.S. dollars
Cash and cash equivalents
Adjusted for:
Debt
Lease-related obligations
Deferred finance charges
Net cash (debt)
Available Liquidity
Available liquidity is a non-GAAP financial measure with no standardized meaning under IFRS and as such, it
may not be comparable to similar financial measures disclosed by other issuers. Available liquidity is defined as
total cash and cash equivalents and short-term investments and the available credit on the Debt Facility (undrawn
35
Torex Gold Resources Inc. | TSX: TXG
capacity less letters of credits utilized). This measure is used by management, and may be used by certain
investors, to measure the Company’s liquidity position.
Reconciliation of Available Liquidity to Cash and Cash Equivalents
The following table provides a reconciliation of available liquidity to cash and cash equivalents as reported in the
Condensed Consolidated Interim Statements of Financial Position:
Table 19.
Jun 30,
2026
169.4
336.9
506.3
In millions of U.S. dollars
Cash and cash equivalents
Available credit of the Debt Facility
Available liquidity
$
$
$
Mar 31,
2026
130.0
336.9
466.9
Dec 31,
2025
119.5
306.8
426.3
Jun 30,
2025
103.0
106.1
209.1
Unit Cost Measures
Unit cost measures are non-GAAP financial measures with no standardized meaning under IFRS and they may
not be comparable to similar financial measures disclosed by other issuers. The Company defines unit cost
measures as components of production costs calculated on a per unit basis (tonnes mined or tonnes processed).
The Company believes that, in addition to conventional measures prepared in accordance with IFRS, such as
costs of sales, certain investors use this information to evaluate the Company’s operating performance and, in
addition to sales, its ability to generate operating income and cash flow from its mining operations. Management
uses this metric as an important tool to monitor operating costs.
36
Torex Gold Resources Inc. | TSX: TXG
Reconciliation of Unit Cost Measures to Production Costs
The following table provides a reconciliation of unit cost measures to production costs as per the Condensed
Consolidated Interim Statements of Operations and Comprehensive Income:
Table 20.
In millions of U.S. dollars, unless
otherwise noted
Gold sold (oz AuEq)
Gold sold (oz)
Tonnes mined - ELG open
pit (kt)
Tonnes mined - ELG
underground (kt)
Tonnes mined - Media
Luna underground (kt)1
Tonnes processed (kt)
Total cash costs:
Total cash costs ($) - gold
equivalent basis
Total cash costs per oz
AuEq sold ($)
Total cash costs ($) - gold
only basis
Total cash costs per oz
sold ($)
Breakdown of
production costs
Mining - ELG open pit
Mining - ELG underground
Mining - Media Luna
underground1
Processing
Site support
Mexican profit sharing
(PTU)
Inventory movement
Concentrate logistics
Other
Production costs
1.
Jun 30,
2026
92,351
68,058
Three Months Ended
Mar 31,
Jun 30,
2026
2025
109,222
76,922
81,233
63,493
Six Months Ended
Jun 30,
Jun 30,
2026
2025
201,573
137,490
149,291
123,249
–
–
1,042
–
1,714
280
276
254
556
441
702
682
289
1,384
289
982
944
809
1,926
1,513
176.6
167.5
123.5
344.1
185.3
1,912
1,534
1,606
1,707
1,348
65.1
31.5
79.9
96.6
139.4
957
388
1,258
647
1,131
$
$/t
–
–
26.2 93.41
$
$/t
–
–
21.8 78.89
$
$/t
7.9 7.61
17.9 70.34
$
$/t
–
–
48.0 86.28
$
$/t
13.9 8.10
32.9 74.62
38.1 54.33
33.0 48.39
12.7 43.95
71.1 51.39
12.7 43.95
55.9 56.90
29.3 29.89
47.1 49.88
26.3 27.85
39.0 48.31
19.3 23.80
103.0 53.44
55.6 28.88
64.2 42.45
27.4 18.09
10.2 10.38
9.4
7.2
19.6 10.17
9.3
(4.4)
8.3
2.6
166.2
9.95
4.8
5.5
3.4
151.3
4.8
3.4
2.9
115.1
8.90
0.4
13.8
6.0
317.5
6.15
3.3
3.4
4.2
171.3
Media Luna underground tonnes mined and mining costs are reported post the declaration of commercial production on May 1, 2025.
ADDITIONAL IFRS FINANCIAL MEASURES
The Company has included the additional IFRS measures “Earnings from mine operations” and “Net cash
generated from operating activities before changes in non-cash operating working capital” in its financial
statements.
37
Torex Gold Resources Inc. | TSX: TXG
“Earnings from mine operations” provides useful information to management and investors as an indication of the
Company’s principal business activities before consideration of how those activities are financed, investments
made in respect of sustaining capital expenditures, and costs of corporate general and administrative expenses,
exploration and evaluation expenses, other expenses, foreign exchange gains and losses, derivative gains and
losses, finance costs and income, and taxation.
“Net cash generated from operating activities before changes in non-cash operating working capital” provides
useful information to management and investors as an indication of the cash flows from operations before
consideration of the impact of changes in operating working capital in the period.
ECONOMIC TRENDS
The market price for gold and foreign currency exchange rates are the most significant external factors that affect
the Company’s financial performance.
Table 21.
Three Months Ended
Jun 30,
Jun 30,
2026
2025
Average market spot prices1
Gold
Silver
Copper
Closing market exchange rates2
Mexican peso : U.S. dollar
Canadian dollar : U.S. dollar
Average market exchange rates2
Mexican peso : U.S. dollar
Canadian dollar : U.S. dollar
1.
2.
Six Months Ended
Jun 30,
Jun 30,
2026
2025
$/oz
$/oz
$/lb
4,506
73.15
6.05
3,280
33.68
4.32
4,693
78.83
5.93
3,067
32.76
4.28
Peso : $
C$ : $
17.5
1.39
18.9
1.36
17.5
1.39
18.9
1.36
Peso : $
C$ : $
17.4
1.37
19.5
1.38
17.5
1.37
20.0
1.41
Based on the LBMA PM fix for gold, LBMA fix for silver and LME cash-settlement price for copper.
Sources: Bank of Mexico for the Mexican peso and Bank of Canada for the Canadian dollar.
Metal prices
The Company’s profitability and operating cash flows are significantly impacted by the price of gold.
From December 31, 2025 to June 30, 2026 based on
closing prices, gold prices decreased 8%. From
December 31, 2024 to June 30, 2025 based on closing
prices, gold prices increased 26%. In January 2025, the
Company entered into gold put options to sell 155,000
oz of gold in 2025 at a strike price of $2,500 per oz. As
at June 30, 2026, the Company had no further
outstanding gold put options.
38
Torex Gold Resources Inc. | TSX: TXG
Foreign exchange rates
The functional currency of the Company and its subsidiaries is the U.S. dollar, and it is, therefore, exposed to
financial risk related to foreign exchange rates.
Changes in exchange rates are expected to have an
impact on the Company’s results. In particular,
approximately 72% of the Company’s payments in the
first half of 2026 were incurred in Mexican pesos. In
addition, the Company is exposed to foreign exchange
risk on its non-U.S. dollar denominated monetary assets
and liabilities. The average exchange rates of the
Mexican peso relative to the U.S. dollar were MXN 17.5
and MXN 20.0 to $1 for the six months ended
June 30, 2026 and 2025, respectively, representing a
12.6% appreciation in the Mexican peso. To manage the
foreign currency risk on operating expenditures to 2027,
the Company entered into a series of zero-cost collars
to hedge against changes in foreign exchange rates of
the Mexican peso.
As at June 30, 2026, the remaining MXN/USD foreign exchange collar contracts to settle a notional value of
$15.0 million between July 2026 and September 2027 have a weighted average put strike (floor) rate of 18.50:1
and a weighted average call strike (ceiling) rate of 20.20:1. For details of the remaining foreign exchange collar
contracts, refer to Table 23. To further manage the foreign currency risk on operating expenditures to 2027, the
Company entered into foreign exchange forward contracts to hedge against changes in foreign exchange rates of
the Mexican peso. As at June 30, 2026, the remaining MXN/USD foreign exchange forwards are for the purchase
of MXN 2,504.7 million for $137.0 million between July 2026 and May 2028 at a weighted average MXN/USD
foreign exchange rate of 18.28:1. For details of the remaining foreign exchange forward contracts, refer to Table
24.
SUMMARY OF QUARTERLY RESULTS
Quarterly Results for the Eight Most Recently Completed Quarters
Table 22.
2026
2025
2024
Jun 30 Mar 31 Dec 31 Sep 30 Jun 30 Mar 31 Dec 31 Sep 30
In millions of U.S. dollars, unless otherwise noted
Financial Results
Revenue
Net income
Per share – Basic
Per share – Diluted
$
$
$/share
$/share
406.9
113.8
1.22
1.20
539.3
207.5
2.18
2.16
465.3
166.8
1.78
1.76
416.4
114.4
1.33
1.31
253.9
83.2
0.97
0.95
170.0
39.0
0.45
0.45
295.0
60.4
0.70
0.69
313.7
29.2
0.34
0.34
For each of the eight most recently completed quarters, the financial data was prepared in accordance with IFRS. The presentation and functional
currency are in U.S. dollars. The quarterly results are unaudited. Sum of all the quarters may not add up to annual or year-to-date totals due to
rounding.
Net income has fluctuated based on, among other factors, the quantity and grade of ore mined and processed,
metal prices, foreign exchange rates, current and deferred income tax recoveries and expenses, consumption
rates and unit costs of plant reagents consumed, interest income and movements in the Company’s share price.
Metal prices affect the Company’s realized sales prices of its production, gains and losses on commodity
derivative contracts entered into, and TOAs with local communities. Fluctuations in the value of the Mexican peso
and Canadian dollar relative to the U.S. dollar affect the Company’s operating and corporate expenses, foreign
currency derivative gains and losses, income taxes, and the value of non-U.S. dollar denominated monetary
assets and liabilities such as cash, VAT receivables, accounts payable and lease-related obligations. Changes in
39
Torex Gold Resources Inc. | TSX: TXG
the value of the Mexican peso also impact the tax basis of non-monetary assets and liabilities considered in the
Company’s deferred tax assets and liabilities.
OFF-BALANCE SHEET ARRANGEMENTS
The Company does not have any off-balance sheet arrangements.
ACCOUNTING POLICIES AND CRITICAL ACCOUNTING ESTIMATES
Refer to Notes 3 and 4 in the Company’s audited consolidated financial statements for the years ended
December 31, 2025 and 2024.
RECENT ACCOUNTING PRONOUNCEMENTS
Refer to Note 3 in the Company’s condensed consolidated interim financial statements for the three months
ended June 30, 2026 and Note 3 in the Company’s audited consolidated financial statements for the years ended
December 31, 2025 and 2024.
FINANCIAL RISK MANAGEMENT
The Company examines the various financial risks to which it is exposed and assesses the impact and likelihood
of those risks. These risks include liquidity risk, interest rate risk, foreign currency risk and commodity price risk,
and are detailed in Note 25 of the Company’s audited consolidated financial statements for the years ended
December 31, 2025 and 2024.
Foreign Currency Risk
Foreign Exchange Zero-Cost Collars
In 2024, the Company entered into a series of zero-cost collars whereby it sold a series of call option contracts
and purchased a series of put option contracts for $nil cash premium to hedge against changes in foreign
exchange rates of the Mexican peso between July 2024 and December 2025 for a total notional value of
$123.7 million, with a weighted average put strike (floor) rate of 19.41:1 and a weighted average call strike
(ceiling) rate of 21.32:1.
In October 2025, the Company entered into an additional a series of zero-cost collars, whereby it sold a series of
call option contracts and purchased a series of put option contracts for $nil cash premium to hedge against
changes in foreign exchange rates of the MXN between January 2026 and September 2027 for a total notional
value of $21.0 million, with a weighted average put strike (floor) rate of 18.50:1 and a weighted average call strike
(ceiling) rate of 20.20:1. The Company intends to enter into additional foreign currency contracts to hedge against
changes in foreign exchange rates of the MXN on a rolling 24-month basis.
As at June 30, 2026, the remaining MXN/USD foreign exchange collar contracts to settle a notional value of
$15.0 million between July 2026 and September 2027 have a weighted average put strike (floor) rate of 18.50:1
and a weighted average call strike (ceiling) rate of 20.20:1.
40
Torex Gold Resources Inc. | TSX: TXG
Table 23.
Settlement Date (Quarter)
Q3 2026
Q4 2026
Q1 2027
Q2 2027
Q3 2027
Total
Weighted Average Put
Strike (Floor) Rate
(MXN/USD)
18.50
18.50
18.50
18.50
18.50
18.50
Weighted Average Call
Strike (Ceiling) Rate
(MXN/USD)
20.20
20.20
20.20
20.20
20.20
20.20
Weighted Average
Collar Amount (USD)
3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
15,000,000
Foreign Exchange Forwards
In 2024, the Company entered into foreign exchange forward contracts to purchase MXN 924.3 million for
$44.0 million between January 2025 and December 2025 at a weighted average MXN/USD foreign exchange rate
of 21.01:1, and all of which had expired on or prior to December 2025.
In the first quarter of 2026, the Company entered into foreign exchange forward contracts to purchase MXN
3,947.2 million for $218.0 million between January 2026 and December 2027 at a weighted average MXN/USD
foreign exchange rate of 18.11:1. In the second quarter of 2026, the Company entered into foreign exchange
forward contracts to purchase MXN 1,809.4 million for $103.0 between May 2026 and May 2028 at a weighted
average MXN/USD foreign exchange rate of 17.57:1. As at June 30, 2026, the remaining MXN/USD foreign
exchange forwards are for the purchase of MXN 2,504.7 million for $137.0 million between July 2026 and May
2028 at a weighted average MXN/USD foreign exchange rate of 18.28:1.
Table 24.
Weighted Average
Foreign Exchange Rate
Weighted Average
(MXN/USD) Forward Amount (USD)
18.12
30,000,000
18.23
25,000,000
18.45
30,000,000
18.32
14,000,000
18.32
14,000,000
18.32
14,000,000
18.24
5,000,000
18.24
5,000,000
18.28
137,000,000
Settlement Date (Quarter)
Q3 2026
Q4 2026
Q1 2027
Q2 2027
Q3 2027
Q4 2027
Q1 2028
Q2 2028
Total
Commodity Price Risk
Gold Put Options
In January 2025, the Company entered into gold put options to sell 155,000 oz of gold between January 2025 and
December 2025 at a strike price of $2,500 per oz. These contracts expired in December 2025, and as at
June 30, 2026, the Company had no further gold put option contracts outstanding.
Quotational Period Hedges
The Company enters into QP Hedges to mitigate exposure to price fluctuations on provisionally priced
concentrate sales, with the objective of achieving final settlement prices of one month after shipment. Under
41
Torex Gold Resources Inc. | TSX: TXG
certain of the Company’s concentrate sales contracts, sales prices are subject to final adjustment based on
quoted market prices during the quotational period specified in the underlying sales agreements.
Given pricing elections by certain customers, in the first quarter of 2026, the Company entered into QP Hedges on
17,500 ounces of gold and 153,000 ounces of silver to achieve final settlement prices of one month after
shipment. In the second quarter of 2026, the Company did not enter into any additional QP Hedges (year ended
December 31, 2025 - the Company entered into QP Hedges on 546,620 ounces of silver and 4,945 tonnes of
copper to achieve this price). These QP Hedges do not qualify for hedge accounting under IFRS 9. Accordingly,
they are classified as financial instruments measured at FVTPL, with changes in fair value recognized in the
Condensed Consolidated Interim Statements of Operations and Comprehensive Income in the period in which
they arise. As at June 30, 2026, the Company did not have any QP Hedge contracts outstanding and the fair
value was $nil (December 31, 2025 - $8.5 million liability).
RISKS AND UNCERTAINTIES
The Company is subject to various operational, financial, compliance and other risks, uncertainties, contingencies
and other factors which could materially adversely affect the Company’s future business, operations, and financial
condition and could cause such future business, operations and financial condition to differ materially from the
forward-looking statements and information contained in this MD&A and as described under the heading
“Cautionary Notes”.
Management monitors the principal risks and uncertainties to the Company’s business, financial condition, and
results of operations for new or elevated risks and supplements, when necessary, its disclosure under “Financial
Risk Management” and below. Readers are cautioned that no enterprise risk management framework or system
can ensure that all risks to the Company, at any point in time, are accurately identified, assessed, managed or
effectively controlled and mitigated.
The nature of the Company’s activities and the locations in which it operates mean that the Company’s business
generally is exposed to significant risk factors, known and unknown, many of which are beyond its control.
For a comprehensive discussion of risks faced by the Company, which may cause the actual financial results,
performance or achievements of the Company to be materially different from the Company’s estimated future
results, performance or achievements expressed or implied by forward-looking information or forward-looking
statements, please refer to the Company’s latest Annual Information Form (“AIF”), filed on SEDAR+ at
www.sedarplus.ca and available on the Company’s website.
INTERNAL CONTROL OVER FINANCIAL REPORTING
The President and Chief Executive Officer and Chief Financial Officer of the Company are responsible for
designing internal controls over financial reporting or causing them to be designed under their supervision, to
provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial
statements for external purposes in accordance with IFRS. The Company’s internal control framework was
designed based on the Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring
Organizations of the Treadway Commission.
The President and Chief Executive Officer and Chief Financial Officer evaluated or caused to be evaluated under
their supervision the design of internal controls over financial reporting as defined by NI 52-109 as at
June 30, 2026. Based on this evaluation, the President and Chief Executive Officer and Chief Financial Officer
concluded that the Company’s internal controls over financial reporting were designed effectively as at
June 30, 2026.
There was no change in the Company’s internal control over financial reporting that occurred during the second
quarter of 2026 that has materially affected, or is reasonably likely to materially affect, the Company’s internal
controls over financial reporting.
42
Torex Gold Resources Inc. | TSX: TXG
Disclosure Controls and Procedures
Disclosure controls and procedures have been designed to provide reasonable assurance that all relevant
information required to be disclosed by the Company is accumulated and communicated to senior management
as appropriate to allow timely decisions regarding required disclosure. The Company’s President and Chief
Executive Officer and Chief Financial Officer have concluded, based on their evaluation of the design of the
disclosure controls and procedures, that as at June 30, 2026, the Company’s disclosure controls and procedures
have been designed effectively to provide reasonable assurance that material information is made known to them
by others within the Company.
Limitations of Controls and Procedures
The Company’s management, including the President and Chief Executive Officer and Chief Financial Officer,
believe that any internal controls over financial reporting and disclosure controls and procedures, no matter how
well designed, can have inherent limitations. Therefore, even those systems determined to be effective can
provide only reasonable assurance that the objectives of the control system are met.
QUALIFIED PERSONS
The scientific and technical information contained in this MD&A pertaining to metal production and production
guidance has been reviewed and approved by Miguel Pimentel, P.Eng., Vice President, Metallurgy and Process
Engineering of Torex Gold Resources Inc. and a Qualified Person under NI 43-101.
The scientific and technical information contained in this MD&A pertaining to mineral resources, drilling and
exploration programs and results have been reviewed and approved by Rochelle Collins, P.Geo., Director, Mineral
Resources of Torex Gold Resources Inc. and a Qualified Person under NI 43-101.
All other scientific and technical information contained in this MD&A has been reviewed and approved by Dave
Stefanuto, P. Eng., Executive Vice President, Technical Services and Capital Projects of Torex Gold Resources
Inc. and a Qualified Person under NI 43-101.
ADDITIONAL INFORMATION
Additional information relating to the Company, including the Company’s most recent AIF, is filed on SEDAR+ at
www.sedarplus.ca, and is available upon request from the Company.
CAUTIONARY NOTES
Forward-Looking Statements
This MD&A contains “forward-looking statements” and “forward-looking information” (collectively, “ForwardLooking Information”) within the meaning of applicable Canadian securities legislation. Forward-Looking
Information includes, but is not limited to, information with respect to the future mining, development, exploration
and drilling plans concerning the Morelos Complex, Los Reyes Project, and the Company's early-stage
exploration properties; the adequacy of the Company’s financial resources; plans to realize the full potential of the
Morelos Complex and seek opportunities to acquire assets that enable diversification and deliver value to
shareholders; the Company’s 2026 guidance and objectives as described in the MD&A, including expected
production levels, costs, capital expenditures, exploration expenditures, and operating performance; expected
production levels throughout the second half of the year; the Company’s return of capital program and target to
return approximately $350 million to shareholders during 2026 through dividends and share repurchases; Media
Luna North development plans, costs and forecasts, including the target of first production in late 2026 with the
declaration of commercial production shortly thereafter; the Company’s objective of expanding resources while
enhancing and extending the current production profile of the Morelos Complex;; 2026 production, cost and
capital expenditure guidance; expected production sequencing, mining rates, plant throughput, grades and
recoveries during the second half of 2026; expected all-in sustaining costs and the factors contributing to revised
43
Torex Gold Resources Inc. | TSX: TXG
cost guidance, including exchange rates, reagent consumption and prices, mining volumes, recoveries, royalties
and land access payments; sustaining and non-sustaining capital expenditures; exploration and drilling
expenditures and the objectives, timing and potential results of exploration programs; expected access to higher
grade stopes at Media Luna Underground by mid-2026; expected mining rates and production volumes at ELG
Underground; the results, assumptions and potential outcomes of the Los Reyes preliminary economic
assessment, including estimated NPV, IRR, payback, mine life, production, costs, capital requirements and
funding expectations; the Company’s ability to fund Los Reyes from cash flows generated by the Morelos
Complex; Los Reyes development plans, including the prefeasibility study starting in the second half of 2026;
expectations regarding reserve and resource growth and future exploration success; timing and execution of
future growth and diversification initiative; the planned listing of Torex Shares on a U.S. exchange, including
timing, regulatory and exchange approvals, satisfaction of listing requirements and Sarbanes-Oxley readiness;
expected liquidity and availability under the Company’s revolving credit facility, including any accordion feature;
and expectations regarding safety, environmental, social and governance initiatives. Forward-Looking Information
also includes the Company’s key strategic objectives: optimize Morelos production and costs, disciplined growth
and capital allocation, grow reserves and resources, project delivery excellence, retain and attract best industry
talent, and be an industry leader in responsible mining.
Generally, Forward-Looking Information can be identified by the use of forward-looking terminology such as
“plans,” “expects,” or “does not expect,” “is expected,” “budget,” “scheduled,” “goal,” “estimates,” “forecasts,”
“intends,” “anticipates,” or “does not anticipate,” “believes”, “potential”, “objective”, “target”, “guided”, “trends” or
“tends” or variations of such words and phrases or statements that certain actions, events or results “may,”
“could,” “would,” “might,” or “will be taken,” “will occur,” or “be achieved.” Forward-Looking Information is subject to
known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity,
performance or achievements of the Company to be materially different from those expressed or implied by such
Forward-Looking Information. Such risks, include, without limitation, risks relating to commodity prices, foreign
exchange rates, inflationary pressures, labour availability and costs, equipment availability and performance,
mining and processing performance, actual grades and recoveries achieved, permitting and regulatory
developments, community relations, security conditions, project execution and scheduling, and the timing and
success of development and exploration activities and other risks factors disclosed herein and elsewhere in the
Company’s public disclosure, including, the AIF, and annual MD&A. Such forward-looking information is based on
assumptions including, among others, assumptions regarding commodity prices; foreign exchange rates,
including the Mexican peso to U.S. dollar exchange rate; mining rates, grades, recoveries and throughput;
availability and cost of labour, reagents, energy, equipment and capital; contractor performance; permitting and
regulatory approvals; geotechnical, metallurgical and geological conditions; the accuracy of mineral resource and
mineral reserve estimates and technical report assumptions; the timing and success of development and
exploration programs; the ability to obtain and maintain required approvals for a U.S. exchange listing; market
conditions and Board approvals for dividends and share repurchases; availability of financing and liquidity; and
general economic, political, regulatory and market conditions; Forward-Looking Information is also based on the
assumptions and risks discussed in this MD&A, the AIF, the annual MD&A, and such other reasonable
assumptions, estimates, analysis and opinions of management made in light of its experience and its perception
of trends, current conditions and expected developments, as well as other factors that management believes to be
relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to
be incorrect, including without limitation, that there will be no material adverse change affecting Torex or its
properties and that political and legal developments will be consistent with current expectations. Although the
Company believes that the assumptions and expectations reflected in such Forward-Looking Information are
reasonable, undue reliance should not be placed on Forward-Looking Information because the Company can give
no assurance that such expectations will prove to be correct. The Forward-Looking Information contained herein
is presented for the purposes of assisting investors in understanding the Company’s expected financial and
operating performance and the Company’s plans and objectives and may not be appropriate for other purposes.
The Company does not undertake to update any Forward-Looking Information, except in accordance with
applicable securities laws. The Los Reyes PEA is preliminary in nature and includes inferred mineral resources
that are considered too speculative geologically to have the economic considerations applied to them that would
enable them to be categorized as mineral reserves. There is no certainty that the results, assumptions or
conclusions of the PEA will be realized. Mineral resources that are not mineral reserves do not have
demonstrated economic viability.
August 6, 2026
44
Torex Gold Resources Inc. | TSX: TXG