Montage Gold Corp. is a gold exploration and development company focused on building a multi-asset African gold producer. Its flagship asset is the Koné project in Côte d’Ivoire, which includes the Koné and Gbongogo deposits and is currently under construction with an estimated 16-year mine life. The company also holds the Wendé exploration property in Côte d’Ivoire, the Didievi project, and exploration permits in Mauritania including the Sfariat and Zednes properties. Incorporated in 2019, the company operates through subsidiaries including K1 Mining S.A., 3G Mining S.A., and Mankono Exploration S.A. in Côte d’Ivoire, and Montage Gold FZCO in the United Arab Emirates. Management includes professionals with experience at Endeavour Mining, Lundin Gold, and Red Back Mining.

Summarised from the company's own disclosures, fiscal year ended Dec 2025

Industry Gold Homepage montagegold.com
Sector Basic Materials IR page montagegold.com/investors
Tags
gold exploration, gold mining, mineral development, west africa, côte d’ivoire, mauritania, greenfield exploration, resource development, Koné project, Koné Exploitation Permit, Gbongogo Exploitation Permit, Wendé Exploration Permit, Didievi project, Sfariat exploration property, Zednes exploration property, K1 Mining S.A., 3G Mining S.A., Chiron Construction S.a.r.l, Shark Mining CDI S.a.r.l, Orca Gold CDI S.a.r.l, Mankono Exploration S.A., Montage Gold FZCO, Montage Invest FZCO, Ghazal Resources Inc.
Press page —

Metrics

Valuation  
Market cap C$ 5.966B
Market cap (USD) $ 4.184B
P/E —
PEG —
P/BV —
P/S —
P/OCF —
P/FCF —
Dividend yield —
Turnover / mcap —
Returns  
ROE -37.3%
ROI -42.8%
ROIC -42.8%
Profit margin —
Growth  
Revenue growing —
Profits growing No
Revenue up 3y —
Revenue up 5y —
Earnings growth 3y (net profit CAGR) —
Quality  
Profitable No
Margin expanding —
Buying back stock —
Diluting (TTM) —
Debt/Equity —
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 0
Quality score —
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021 FY 2020 FY 2019
Assets 732.472M 270.074M 34.069M 39.804M 18.586M 35.053M 16.613M
Net profit -49.88M -67.771M -18.21M -7.493M -18.649M -7.798M -4.042M

Operating KPIs — quarters

KPI Dec 25
Properties 8,000
Reported —

Operating KPIs — years

KPI Dec 2025
Properties 8,000
Reported —

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

Press Release All amounts in US dollar unless otherwise specified

MONTAGE GOLD ACHIEVES FIRST GOLD POUR AT ITS KONÉ MINE ON BUDGET AND AHEAD OF SCHEDULE HIGHLIGHTS: › First gold pour at the Koné mine achieved on budget and ahead of the initial schedule of Q2-2027 › +14.1 million hours worked to date with a strong safety record › Construction of the Koné mine has created approximately 3,600 jobs with over 95% national employment and will create approximately 1,500 permanent roles during operations

› Full ramp-up of the oxide circuit to commercial production expected to be achieved by year-end › Hard-rock comminution circuit remains on-budget and on-schedule for completion in Q2-2027 › 130,000 meters of drilling is underway at the Koné mine for 2026, which will total 380,000 meters drilled since the 2024 Updated Feasibility Study was published Abidjan, Côte d’Ivoire — September 27, 2026 — Montage Gold Corp. (“Montage” or the “Company”) (TSX: MAU, OTCQX: MAUTF) is pleased to report that it has achieved first gold pour at the Company’s flagship Koné mine, in Côte d’Ivoire, on-budget and ahead of schedule. Construction began in December 2024, and the first gold pour was achieved on September 26, 2026, yielding approximately 1,140 ounces of gold. More than 400,000 tonnes of ore have been processed since ore was first introduced into the oxide circuit on September 8, 2026. The addition and early completion of the oxide circuit enabled gold production significantly ahead of the initial schedule. The oxide circuit is expected to reach commercial production in Q4-2026, while construction of the hard-rock comminution circuit remains on budget and on track for completion in Q2-2027. Figure 1: First gold pour at the Koné mine

montagegold.com

1

TSX MAU

OTCQX MAUTF

Martino De Ciccio, CEO of Montage commented: “We are thrilled to have achieved first production at our Koné mine safely, on budget, and ahead of schedule. It marks a significant milestone in the rapid execution of our strategy of creating a premier multiasset African gold producer. Koné is now the ninth operating gold mine in Côte d’Ivoire and poised to deliver strong benefits for all stakeholders, with approximately 3,600 direct jobs created to date, over 95% of which are nationals, and many more indirectly created. We’d like to thank our employees for their strong dedication along with everyone who has contributed to reaching this important milestone, including our local stakeholders, financiers, suppliers and contractors. We look forward to continuing to rapidly grow our business by advancing our development pipeline, with notably the Didievi project in Côte d’Ivoire which is poised to become our next development asset.” Peder Olsen, President and Chief Development Officer of Montage commented: “We are extremely proud to be delivering the Koné project well ahead of schedule and on budget. Our ability to self-perform construction activities has significantly reduced capital cost requirements and allowed us to optimize the construction timeline. Ramp-up of the oxide circuit is progressing well with ore from the Koné deposit being directly fed into the mill, while we look forward to commencing mining activities at the higher-grade Gbongogo Main satellite deposit in late Q4-2026 and other recently discovered higher grade satellite deposits over the course of 2027.” Construction of the Koné mine has created approximately 3,600 jobs, of which over 95% were nationals thanks to the training programmes initiated prior to launching construction. Montage’s owner-mining operating model has allowed construction employees to transition within the operating team, thanks to further training programmes and on-site truck-driving simulators. Once ramped up, the operation is expected to create approximately 1,500 permanent roles and many more indirect roles. Mining activities at the Koné deposit are progressing well with low working capital requirements as the oxide circuit allows for minimal rehandling as the majority of the ore mined from surface is being fed directly into the plant. Mining of the higher grade Gbongogo Main deposit is expected to commence in late 2026, while mining at other recently discovered higher grade satellite deposits is expected to commence over the course of 2027. The Probable Reserves for the Koné mine, as published along with the 2024 Updated Feasibility Study (“2024 Feasibility Study”), stood at 4.01Moz at a grade of 0.72 g/t Au, comprised of 3.52Moz at 0.67 g/t Au and 0.49Moz at 1.43 g/t Au for the Koné and Gbongogo Main deposits, respectively. Given the exploration success, 12 deposits have now been delineated while mineralization has been intercepted at 25 targets with over 20 targets yet to be drill tested. On June 15, 2026, the Company reported that Measured and Indicated (“M&I”) Resources for higher grade satellite deposits have increased by 1.14Moz to 1.66Moz at 1.51 g/t Au compared to 520koz at 1.48 g/t Au, which was used as a basis for the 2024 Feasibility Study whilst Inferred Resources for satellite deposits have increased from nil to 766koz at 1.34 g/t Au. The overall Koné mine M&I Resources have increased by 1.42Moz to 6.29Moz, with grade improving by 27% to 0.80 g/t Au, and Inferred Resources have increased by 1.62Moz to 2.03Moz, with grade increasing by 36% to 0.68 g/t Au, as compared to the basis used for the 2024 Feasibility Study1. An exploration programme consisting of over 130,000 meters of drilling is underway at the Koné mine for 2026, which once complete will total over 380,000 meters of drilling since the publication of the 2024 Feasibility Study, aimed at discovering highergrade satellite deposits with the objective of boosting production from the onset. As previously announced, the Company expects to publish an updated life of mine plan for the Koné mine along with year-end reserves and resources, to incorporate new data for the Koné, Gbongogo Main and other higher-grade satellite deposits, as well as the initiatives undertaken to further unlock value including the oxide circuit, process plant design enhancements, and the shift to an owner-operated mining model.

1 For additional details regarding the key assumptions, parameters, and methods used to estimate the Mineral Resources, and for data verification related thereto, see the press release

of the Company dated June 15, 2026 titled "Montage Gold grows Koné higher grade satellite resources to 1.7Moz at 1.5 g/t Au Indicated and 0.8Moz at 1.3 g/t Au Inferred", and in respect of the Mineral Reserves, the 2024 Updated Feasibility Study, each as filed on SEDAR+.

montagegold.com

2

TSX MAU

OTCQX MAUTF

NEXT STEPS Key upcoming catalysts by asset across the Company include: Table 1: Key upcoming catalysts by asset

PROPERTY

CATALYST

Didievi project

› Further exploration results from the ongoing 130,000-meter drilling programme in Q4-2026 › Updated life of mine plan along with 2026 year-end reserves and resources › Ramp-up to commercial production on the oxide circuit during Q4-2026 › Completion of the hard-rock comminution circuit in Q2-2027 › Exploration results from the ongoing drilling programme, which is expected to yield an

Wendé property

› Further exploration results from the recently completed 9,000-meter drill programme in Q4-

Koné mine

Mauritania greenfield properties

updated resource estimate 2026

› Early-stage exploration activities ongoing with scout drilling to commence in Q4-2026

ABOUT MONTAGE GOLD Montage Gold Corp. (TSX: MAU) is a Canadian-listed company focused on becoming a premier multi-asset African gold producer, with its flagship Koné mine, located in Côte d’Ivoire, at the forefront. Based on the Updated Feasibility Study published in 2024 (the “UFS”), the Koné mine has an estimated 16-year mine life and sizeable annual production of +300koz of gold over the first 8 years and entered production in Q3-2026. The Company has also built a high-quality, multi-asset growth pipeline including the Didievi and Wendé properties in Côte d’Ivoire, and a portfolio of prospective exploration tenements in Mauritania.

MONTAGE GOLD REPORTS ON ITS Q2-2026 ACTIVITIES Bull 4 Bear 0 Product/operations

Koné construction on-budget and ahead of schedule for Q4-2026 • Continued resource expansion • Robust liquidity sources

KONÉ CONSTRUCTION ACTIVITIES

› Rapid progress achieved with +12.9 million hours worked to date, with +3,600 employees and contractors on-site

› Well on track for first gold pour in Q4-2026 through the oxide circuit and on budget with $714.4 million of capital

committed as at today, representing approximately 81% of the total upfront capital expenditure

› Construction of all major infrastructure and equipment necessary for the oxide-circuit start-up has been completed

including the oxide sizer, ball mill, classification areas, thickeners, CIL trains and services area

› Dry commissioning for the oxide circuit has begun following the successful connection to the grid-power

› Staffing for all key operational roles is complete and mining activities are commencing

EXPLORATION ACTIVITIES

› Strong exploration focus with over 224,000 meters planned to be drilled across the portfolio in 2026

› 130,000 meters of drilling underway at the Koné project, up from the initial budget of 90,000 meters for 2026, with 90,576

meters already drilled in H1-2026 and further resource updates expected to be published in Q4-2026

›85,000 meters of drilling underway at the Didievi project, with 29,235 meters drilled in H1-2026 which is expected to yield

an updated resource estimate, with high-grade intercepts recently published

›Over 9,000 meters of drilling underway at the Wendé advanced greenfield exploration property with recently published

drill results increasing confidence to delineate a maiden resource following upcoming drill programmes

FINANCIAL POSITION & CORPORATE UPDATES

›Robust liquidity and Koné project funding sources totalling $309.0 million compared to total remaining capital

disbursements of $261.2 million, inclusive of only $161.2 million remaining to complete the oxide circuit

›Didievi project ownership to increase from 80% to 95.5% and a 1.5% NSR royalty to be repurchased for a total transaction

consideration of approximately $57.7 million; Obtained $75 million unsecured loan with Macquarie Bank to fund

acquisition and accelerate exploration and development activities at Didievi

Vancouver, Canada — August 11, 2026 — Montage Gold Corp. (“Montage” or the “Company”) (TSX: MAU, OTCQX: MAUTF) is

pleased to report on its construction and exploration activities for Q2-2026, with highlights provided in Table 1 below.

Table 1: Business and financial highlights

THREE MONTHS ENDEDSIX MONTHS ENDED

All amounts millions of USD unless otherwise specified

Jun 30,

2026

Mar 31,

2026

Jun 30,

2025

Jun 30,

2026

Jun 30,

2025

Δ Q2-2026

vs. Q1-2026

CUMULATIVE CONSTRUCTION ACTIVITIES

Cumulative hours worked, million hrs 12.09.32.712.02.7+2.7

Lost-Time Injuries Frequency Rate

1

0.080.11 - 0.08 - (0.03)

Total cumulative capital committed, inclusive of disbursed 686.0 606.9 339.2 686.0 339.2 +79.1

  • Cumulative capital disbursed

1

623.8 504.9 158.8 623.8 158.8 +119.0

  • Cumulative capital committed and yet to be disbursed

1

62.2 99.3 180.4 62.2 180.4 (37.1)

COMPANY EXPLORATION ACTIVITIES

Meters drilled, meters

2

58,20047,25437,393105,45483,280+10,946

Exploration expenditure

1,2

9.7 7.5 6.4 17.1 13.3 +2.2

CASH FLOW AND LIQUIDITY POSITION

1

Cash flows used in investing activities (128.0) (110.3) (88.3) (238.3) (145.0) (17.7)

Cash flows generated from financing activities 212.8 (0.1) 150.5 212.7 151.0 +212.9

Cash and cash equivalents, end of period 154.4 79.4 99.9 154.4 99.9 +75.0

Total liquidity and Koné project funding sources 309.0 440.2 734.8 309.0 734.8 (131.2)

1

As referenced in the Company’s Financial Statements and Management’s Discussion and Analysis for the three and six months ended June 30, 2026, available on SEDAR+ and on

the Company’s website.

2

Excludes drilling done by African Gold prior to the April 29, 2026, transaction close.

The Company’s condensed interim consolidated Financial Statements and associated Management’s Discussion and Analysis

for the three and six months ended June 30, 2026, have been filed under the Company’s profile on SEDAR+

(www.sedarplus.ca) and are available for download on the Company’s website.

montagegold.com 1

Rapid construction progress continues to be made at the Company’s flagship Koné project, in Côte d’Ivoire, with first gold pour

targeted ahead of schedule in Q4-2026 through the oxide circuit, and remaining on-budget. A total of 2.7 million construction

hours were worked in Q2-2026, with total hours worked now totalling over 12.9 million hours since the commencement of the

project until today, with a Lost Time Injury Frequency Rate (“LTIFR”) of 0.08.

Significant progress is being made on the key processing infrastructure ahead of an oxide start-up, with the successful

completion of the oxide sizer, ball mill, classification areas, thickeners, carbon in leach ("CIL") trains, reagents areas and water

services. Construction of the 225kV power line and on-site 33kV substation has been completed, enabling the substation to be

fully energized. Power has been reticulated throughout the processing plant and dry commissioning of discrete operable

systems has begun. Construction of the hard-rock comminution circuit continues to advance on-schedule, with major concrete

pours occurring across the primary and secondary crushers, screening areas and high-pressure grinding rollers (“HPGR”).

Construction of the tailings storage facility (“TSF”) and the laydown of high-density polyethylene (“HDPE”) liners has been

completed, whilst overland piping for the water storage facility (“WSF”) reclaim, tailings pumping and decant water return

system continues to progress ahead of schedule. Mining activities are commencing to build a run-of-mine stockpile for the

oxide-circuit ahead of wet commissioning and production ramp-up. A total of $686.0 million of capital had been committed as

at quarter-end (inclusive of $623.8 million disbursed), which has further increased to approximately $714.4 million as at today,

representing approximately 81% of the total $885.0 million capital expenditure, with prices in line with expectations.

In parallel, the Company continues to be focused on unlocking value through its exploration programmes. At the Koné project,

a total of 43,322 meters were drilled in Q2-2026, amounting to 90,576 meters for H1-2026, with exploration efforts continuing

to focus on infill and extension drilling, advancing pre-resource targets toward maiden resource definition, and testing of new

targets. Updated Mineral Resource Estimates for satellite deposits, including Gbongogo South, Koban North, ANV, Yeré North,

Lokolo Main, Sena and Diouma North and maiden Mineral Resource Estimates for new discoveries such as Petit Yao and

Soman were published on June 15, 2026. As a result, Measured and Indicated (“M&I”) Resources for higher-grade satellite

deposits at the Koné project have increased by 1.1Moz to 1.7Moz at 1.51 g/t Au compared to 520koz at 1.48 g/t Au which was

used as a basis for the 2024 Updated Feasibility Study (“UFS”) whilst Inferred Resources for satellite deposits have increased

from nil to 0.8Moz at 1.34 g/t Au. At the Didievi project, high-grade drill intercepts, as published on July 14, 2026, have

demonstrated the continuity of mineralization at the Blaffo Guetto deposit whilst highlighting its growth potential. A further

60,000-meter drill programme was launched during Q2-2026 at Didievi, amounting to approximately 85,000 meters for the

year, which is expected to yield an updated resource estimate. At the Wendé advanced greenfield property, a 9,000-meter drill

programme is underway, with initial results published on July 29, 2026, confirming the prospectivity of the property and

increasing confidence in the ability to delineate a maiden resource following upcoming drill programmes.

Following the completion of the acquisition of African Gold on April 29, 2026, the Company entered into a binding agreement

with minority shareholders, for a total consideration of approximately $57.7 million, to increase its ownership interest by

15.5% to 95.5% in its Didievi project, in Côte d'Ivoire, and to repurchase a 1.5% royalty on the asset. In addition, as part of the

agreement, Montage has also increased its interest by 15.5% to 95.5% in its Konahiri North, Konahiri South and Koyekro

properties, in Côte d'Ivoire, and obtained an option to repurchase a 0.75% royalty on these properties in the future. To fund

the transaction and to accelerate activities at the Didievi project, Montage obtained a $75 million unsecured loan with

Macquarie Bank, with an interest rate of SOFR + 5.5%, reducing to SOFR + 4.5% next year, and a 2-year term.

Martino De Ciccio, Chief Executive Officer of Montage, commented: “We have achieved significant construction milestones at

our flagship Koné project, in Côte d’Ivoire, which are the culmination of nearly 13 million people hours worked on the project

since its commencement. Construction of all major infrastructure and equipment necessary for the oxide circuit start-up has

been completed including the oxide sizer, ball mill, classification areas, thickeners, CIL trains and services area. As such, we

have started dry commissioning of the oxide circuit while mining activities are commencing. We are therefore well on track to

pour first gold during Q4-2026, while remaining on budget.

On the exploration front, given the success of the programme at the Koné project, which continues to add higher grade satellite

resources, we have increased this year’s programme by 40,000 meters to 130,000 meters for the year, with approximately

90,000 meters already completed by mid-year. At Didievi, which is poised to be our next development asset, we have launched

a new 60,000-meter programme, which will bring total meters drilled this year to 85,000 meters and is expected to underpin an

updated mineral resource estimate. At our Wendé advanced greenfield exploration property, we are very excited with the first

drill results recently published which confirmed the prospectivity of the property and increased our confidence to rapidly

delineate a maiden resource through upcoming drill programmes while leveraging approximately 60,000 meters of drilling

conducted on the property by previous owners.

We are very pleased with the momentum that we continue to generate across our business as we focus on executing our

strategy of creating a premier, multi-asset African gold producer and delivering value for all our stakeholders.”

Press Release

MONTAGE GOLD CONFIRMS THE PROSPECTIVITY OF ITS WENDÉ ADVANCED GREENFIELD EXPLORATION PROPERTY IN CÔTE D’IVOIRE HIGHLIGHTS: › Wendé advanced greenfield exploration property, in Côte d’Ivoire, was awarded to Montage in December 2025 › Over 60,000 meters of drilling was conducted on the property by previous owners, mainly on the Bobosso target which hosts a gold-in-soil anomaly covering an area of approximately 7km2

› Over 6,500 meters drilled so far this year out of the 9,000-meter programme underway which confirmed the continuity of mineralization at the Bobosso target and extended its known mineralization

› Best selected intercepts from the ongoing drill programme at the Bobosso target include: ─ ─ ─ ─ ─ ─

BMRC0030: 6.0 meters at 3.86 g/t Au from 98 meters and 8.0 meters at 8.06 g/t Au from 134 meters and 14.0 meters at 2.92 g/t Au from 146 meters BMRC0029B: 13.0 meters at 4.36 g/t Au from 32 meters BMRC0021: 24.0 meters at 0.96 g/t Au from 4 meters BMRC0014: 17.0 meters at 1.35 g/t Au from 95 meters BMRC0026: 8.0 meters at 2.68 g/t Au from 20 meters BMRC0008: 8.0 meters at 1.98 g/t Au from 47 meters

› In addition to the Bobosso target, 8 other exploration targets have been identified across the property › Montage aims to rapidly advance the Wendé property towards a maiden resource through its upcoming drill programmes

› Montage has consolidated further exploration grounds in proximity to Wendé as it has recently been granted a prospective 349km2 permit Abidjan, Côte d’Ivoire — July 29, 2026 — Montage Gold Corp. (“Montage” or the “Company”) (TSX: MAU, OTCQX: MAUTF) is pleased to provide an exploration update for its Wendé advanced greenfield exploration property, in Côte d’Ivoire, where drill results have confirmed the prospectivity of the property. A total of 6,539 meters have been completed out of the ongoing 9,000-meter drill programme launched earlier this year, with results confirming the prospectivity of the Bobosso target, which hosts a gold-in-soil anomaly covering an area of approximately 7km2. Approximately 60,000 meters of drilling has been conducted on the property by previous owners, with current in-fill drill results confirming the continuity of mineralization at the Bobosso target whilst step-out drilling has also succeeded in extending mineralization along the current strike, as well as down dip of historical drill holes. As a result, the Company is confident that upcoming drill programmes may result in the delineation of a maiden mineral resource. Furthermore, the Company is pleased to announce that the Ministry of Mines, Petroleum and Energy, in conjunction with the Ministry of Finance and Budget and the Ministry of the Environment, Sustainable Development and Ecological Transition, of Côte d’Ivoire, has approved the grant of the Dabakala permit (PR1081), thereby consolidating further prospective exploration grounds in proximity to Wendé. Martino De Ciccio, CEO of Montage commented: “With our Koné project rapidly advancing on-budget and ahead of schedule, and our Didievi project poised to be our next development asset, both in Côte d’Ivoire, we are in parallel focused on enhancing our growth pipeline with the goal of sourcing our next project organically through our ability to stake and explore grounds. Today’s drill results at the Wendé advanced greenfield exploration property in Côte d’Ivoire demonstrate the prospectivity of the property and increase our confidence in our ability to rapidly delineate a maiden resource through upcoming drill programmes. Moreover, our rapid success in unlocking exploration value for all stakeholders, coupled with our win-win approach, continues to montagegold.com

1

TSX MAU

OTCQX MAUTF

reinforce Montage as the partner of choice for local partners and host governments, as we continue to execute on our goal of becoming a premier African gold producer.” Silvia Bottero, EVP Exploration of Montage commented: “In order to continue to position ourselves as the partner of choice, we are delivering on our commitment to rapidly explore recently awarded tenements. It is pleasing to immediately confirm the prospectivity of the Wendé property, which was awarded to Montage in late 2025, with already line of sight on resource delineation potential given the attractive drill results. The ongoing exploration programme at Wendé has extended the mineralization at the Bobosso target and confirmed the continuity between previously drilled holes and downdip. Moreover, given that Wendé is located on a major gold mineralised and structurally important trend, we have already identified a number of other targets on the property which we intend to drill test in upcoming campaigns.”

WENDÉ ADVANCED GREENFIELD EXPLORATION PROPERTY OVERVIEW The Wendé advanced greenfield exploration property, covering an area of approximately 107km 2, was granted in December 2025 and is located in the central-northeast region of Côte d'Ivoire, approximately 360km northeast of Abidjan. The property is accessible from Abidjan via a paved national highway to within 40km from of the property. The Dabakala greenfield exploration property, covering an area of approximately 349km2, was granted in July 2026 and is located immediately north of the Wendé permit. Figure 1: Location of the Wendé and Dabakala properties and geological context

montagegold.com

2

TSX MAU

OTCQX MAUTF

The properties are situated along a prolific and major litho-structural structure known as the Ouango-Fitini Shear Zone (“OFSZ”), extending as far north as Endeavour Mining’s Houndé and Mana mines in Burkina Faso, transgressing into Côte d’Ivoire. To the east of the OFSZ, the structure is bounded mainly by Birimian detrital sediments, whilst to the west predominantly Birimian intrusive and basement rocks can be found. A series of greenstone belts, late Birimian felsic intrusions and Tarkwaian sediments are intercalated along the OFSZ. Secondary order structures frequently splay from the main OFSZ, and together with the contrasting lithologies and late intrusions, provide the potential for gold mineralization. The Wendé property has been intermittently explored by previous owners providing a series of geological data and targets that form the basis for targeted exploration. In total, over 60,000 meters has drilled by previous owners across the property. Previous drilling had identified an oval-shaped, overall north-northeast striking target, initially based on gold-in-soil anomalies, covering an area of approximately 7km2, named Bobosso. The Bobosso target, shown in Figure 2, straddles a greenstone belt composed of volcanic, volcaniclastic and mafic intrusive rocks in contact with felsic intrusive rocks. Based on airborne and ground geophysical interpretations, the prospect is associated with secondary structures and splays from the OFSZ. Figure 2: Wendé exploration targets and lithological units (left) against aeromagnetic maps (right)

montagegold.com

3

TSX MAU

OTCQX MAUTF

WENDÉ EXPLORATION PROGRAMME Following receipt of the Wendé permit in December 2025, Montage commenced a target definition exercise utilising its wellestablished exploration methodology to develop a pipeline of exploration targets. An initial review of all exploration data has culminated in the identification of an initial 9 exploration targets, as detailed below and categorised in Figure 3:

› ›

Bobosso targets (5), dividing the initial soil geochemical anomaly into discrete targets for effective drilling testing;

› ›

Wendé / Wendé East (2), at the junction between the OFSZ and secondary order structural splays; and

Wabonon South (1), a target to the north of the tenement, at the southern edge of the basin, interpreted to be of Tarkwaian age; Bogoba (1), at the contact between mafic intrusions and granodioritic rocks, approximately 2.5km south of Bobosso. Figure 3: Exploration target triangle for the Wendé property (July 2026)

Following the target definition exercise, the Company launched a 9,000-meter drilling programme in Q2-2026 amounting to US$2.0 million, focussed on the more advanced Bobosso targets (Bobosso, Bobosso S and Bobosso W) and across three parallel tracks, which include:

›

Validating previous exploration and drilling intercepts in the vicinity of Bobosso through previous drill-hole twinning and in-fill drilling, thereby building a more robust and reliable geological model;

› ›

Extending mineralization along strike and down-dip at the Bobosso target through step-out deeper drilling; and Progressing drilling data towards the preparation of a maiden resource through effective drill pattern design, in-fill and twin drilling of previous holes, while improving of geological interpretation and modelling.

At the end of June 2026, a total 6,539 meters of reverse circulation (“RC”) drilling had been completed, with the remaining programme expected to be completed in Q3-2026.

montagegold.com

4

TSX MAU

OTCQX MAUTF

WENDÉ EXPLORATION PROGRAMME DRILLING RESULTS The initial results from drilling completed by Montage to the end of June 2026 have confirmed the mineralisation intercepted in the historical drill holes, providing a better understanding of the deposits structural controls and geological continuity. Best selected intercepts, drilled by Montage, include:

› BMRC0030: 6.0 meters at 3.86 g/t Au from 98 meters and 8.0 meters at 8.06 g/t Au from 134 meters and 14.0 meters at 2.92 g/t Au from 146 meters

› BMRC0029B: 13.0 meters at 4.36 g/t Au from 32 meters › BMRC0021: 24.0 meters at 0.96 g/t Au from 4 meters › BMRC0014: 17.0 meters at 1.35 g/t Au from 95 meters › BMRC0026: 8.0 meters at 2.68 g/t Au from 20 meters › BMRC0008: 8.0 meters at 1.98 g/t Au from 47 meters Gold mineralization at the Bobosso target has been recognized as a cluster of parallel continuous trends, striking north-northeast to northeast, dipping 60-70° toward north-northwest to northwest, consistently to the strike of the structures splaying from the OFSZ as interpreted from geophysics and structural measurements on core. Individual mineralized trends extend between 1.0 to 2.0 km as supported by drilling. Drilling assays show wide intercepts, often up to 50.0 meters in apparent thickness, with grades generally ranging from 1.0 to 1.5 g/t Au. Gold mineralisation occurs throughout volcaniclastic sequence, showing evidence of deformation and hydrothermal alteration. The mineralised trends remain open both downdip and along strike. Selected intercepted from holes drilled by both Montage and previous owners are presented in Figure 4 below. The continuity of mineralization and stacking of multiple veins can be visualised in the sections presented in Figures 5 and 6. Figure 4: Bobosso target plan view and best intercepts

montagegold.com

5

TSX MAU

OTCQX MAUTF

Figure 5: Bobosso target cross section through A-A’

Figure 6: Bobosso target cross section through B-B’

montagegold.com

6

TSX MAU

OTCQX MAUTF

NEXT STEPS Key upcoming catalysts by asset across the Company include: Table 1: Key upcoming catalysts by asset

PROPERTY

CATALYST

› Further exploration results from the ongoing 90,000-meter drilling programme throughout the year

Didievi project

› Updated mineral resources for select deposits throughout the year › Updated life of mine plan along with 2026 year-end reserves and resources › First gold pour through the oxide circuit in late Q4-2026 › Completion of the hard-rock comminution circuit in Q2-2027 › Exploration results from the ongoing drilling programme, which is expected to yield an

Wendé property

› Further exploration results from the 9,000-meter drill programme

Mauritania greenfield properties

› Early-stage exploration activities ongoing with scout drilling to commence in Q4-2026

Koné project

updated resource estimate

ABOUT MONTAGE GOLD Montage Gold Corp. (TSX: MAU) is a Canadian-listed company focused on becoming a premier multi-asset African gold producer, with its flagship Koné project, located in Côte d’Ivoire, at the forefront. Based on the Updated Feasibility Study published in 2024 (the “UFS”), the Koné project has an estimated 16-year mine life and sizeable annual production of +300koz of gold over the first 8 years and is expected to enter production in late Q4-2026. The Company has also built a high-quality, multi-asset growth pipeline including the Didievi and Wendé properties in Côte d’Ivoire, and a portfolio of prospective exploration tenements in Mauritania.

Prompts

Montage Gold Corp. (ticker MAU), listed in Canada.

Company History

Date Change Detail
Dec 31, 2024 Reporting currency Its CA reports are in USD instead of CAD from this period. Earlier figures are shown in USD, converted at each period end's exchange rate.

ETFs Holding Montage Gold Corp.

ETF Weight in ETF Shares Market value As of
AVSD 0.03% 10,634 $ 109.459K Nov 16, 2026
AVDS 0.03% 11,818 $ 121.647K Nov 16, 2026
AVDE 0.01% 267,800 $ 2.757M Nov 16, 2026