Ivanhoe Mines Ltd. is a mining company focused on the discovery, development, and production of critical metals, primarily copper, zinc, and platinum-group metals. Its core operations include the Kamoa-Kakula Copper Complex in the Democratic Republic of the Congo, the Kipushi Mine in the DRC, and the Platreef Project in South Africa. The company also conducts extensive exploration activities in the Western Forelands region near Kamoa-Kakula, where it has identified several copper discoveries. Ivanhoe Mines serves global markets by supplying essential metals required for clean energy transition and industrial applications. The company holds significant ownership stakes in its assets across its operating regions.

Summarised from the company's own disclosures, fiscal year ended Oct 2026

Industry Other Precious Metals & Mining Homepage ivanhoemines.com
Sector Basic Materials IR page ivanhoemines.com/investors
Tags
copper mining, zinc mining, platinum-group metals, nickel mining, exploration, critical minerals, concentrate production, Kamoa-Kakula Copper Complex, Kipushi Mine, Platreef Project, Western Forelands Copper Exploration, Makoko, Makoko West, Kiala, Kitoko
Press page ivanhoemines.com/news-stories/news-release

Metrics

Valuation  
Market cap C$ 12.895B
Market cap (USD) $ 9.014B
P/E —
PEG —
P/BV —
P/S —
P/OCF —
P/FCF —
Dividend yield —
Turnover / mcap —
Returns  
ROE —
ROI —
ROIC —
Profit margin —
Growth  
Revenue growing —
Profits growing —
Revenue up 3y —
Revenue up 5y —
Earnings growth 3y (net profit CAGR) —
Quality  
Profitable —
Margin expanding —
Buying back stock —
Diluting (TTM) —
Debt/Equity —
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 0
Quality score —
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure H1 2026 Q2 2026 Q1 2026 Q3 2025 Q3 2025 H1 2025 Q2 2025 Q1 2025 Q3 2024 Q3 2024 H1 2024 Q2 2024
Revenue 318.14M 152.611M 165.529M 303.18M 129.403M 173.777M 96.757M 77.02M 0 0 0 0
Net profit 49.758M 49.741M 17K 206.868M 33.057M 173.811M 44.051M 129.76M 128.791M 117.942M 10.849M 76.401M

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

Publish date: 08 October 2026

Share:

Africa’s largest copper smelter produced a record 118,638 tonnes of high-strength sulphuric acid in Q3; average realized contract prices approx. $900 per tonne

Kamoa-Kakula’s new 60-MW on-site hybrid solar facility ramped up in September, reducing on-site diesel generator consumption by 40%

Power purchase agreements signed to double on-site hybrid solar capacity to 120 MW within 18 months

Kipushi produced a record 77,147 tonnes of zinc in concentrate in Q3 2026, a quarterly increase of 10%, cementing Kipushi as the world’s third-largest zinc mine in 2026

Construction of Platreef’s Phase 2 concentrator advancing on schedule for Q4 2027 completion

Ivanhoe to issue Q3 2026 financial results after market close on November 3; host conference call for investors on November 4

Johannesburg, South Africa–(Newsfile Corp. – October 8, 2026) – Ivanhoe Mines’ (TSX: IVN) (OTCQX: IVPAF) Executive Co-Chair Robert Friedland and President and Chief Executive Officer Marna Cloete announced today the company’s third-quarter production results and an update on operational and project activities.

Copper production for the third quarter totaled 76,401 tonnes in saleable products, including 61,506 tonnes of copper in anode produced by the Kamoa-Kakula smelter, 2,347 tonnes of toll-treated copper in blister at the nearby Lualaba Copper Smelter (LCS), 5,645 tonnes of copper in slag concentrate produced by the Kamoa-Kakula smelter and 6,904 tonnes of copper fines designated for sale.

Q3 production of 76,401 tonnes of copper in saleable products

Summary of quarterly production data from Kamoa-Kakula

| | | | | | |

| --- | --- | --- | --- | --- | --- |

| Phase 1 & 2 concentrators | Q3 2025 | Q4 2025 | Q1 2026 | Q2 2026 | Q3 2026 |

| Ore milled (000’s tonnes) | 1,838 | 1,712 | 1,534 | 1,387 | 1,820 |

| Feed grade of ore processed (% copper) | 2.50% | 2.32% | 2.35% | 2.59% | 2.36% |

| Copper recovery (%) | 81.3% | 83.2% | 84.1% | 86.6% | 88.9% |

| Copper in concentrate produced (tonnes) | 37,744 | 34,602 | 30,527 | 30,211 | 38,523 |

| | | | | | |

| Phase 3 concentrators | | | | | |

| Ore tonnes milled (000’s tonnes) | 1,618 | 1,662 | 1,574 | 1,582 | 1,673 |

| Feed grade of ore processed (% copper) | 2.44% | 2.38% | 2.28% | 2.22% | 2.07% |

| Copper recovery (%) | 84.2% | 88.2% | 87.2% | 88.2% | 86.0% |

| Copper in concentrate produced (tonnes) | 33,522 | 34,814 | 31,379 | 30,923 | 29,664 |

| | | | | | |

| Combined Phase 1, 2, and 3 concentrators | | | | | |

| Ore tonnes milled (000’s tonnes) | 3,456 | 3,374 | 3,108 | 2,968 | 3,493 |

| Feed grade of ore processed (% copper) | 2.47% | 2.35% | 2.32% | 2.39% | 2.22% |

| Copper recovery (%) | 82.7% | 85.7% | 85.6% | 87.4% | 87.6% |

| Copper in concentrate produced (tonnes) | 71,266 | 69,419 | 61,906 | 61,134 | 68,188 |

| | | | | | |

| Smelter and other saleable products | | | | | |

| Total contained copper in saleable products (000’s tonnes)(1) | | | 71,417 | 64,328 | 76,401 |

| High-strength sulphuric acid (000’s tonnes) | | | 117,871 | 112,307 | 118,638 |

Scroll to view

Data in bold denotes a quarterly record.

(1) Total contained copper in saleable products includes anodes produced by Kamoa-Kakula’s on-site smelter, concentrate toll-treated at the LCS smelter, as well as slag concentrate and high-grade fines produced by Kamoa-Kakula that cannot be smelted on-site or at LCS, designated for sale to third parties.

Rounding errors may affect totals

The 2026 production guidance range remains 290,000 to 310,000 tonnes of copper in saleable copper products, with production trending towards the lower end of guidance. Copper production in H2 2026 is boosted by both higher mining rates across the complex and the addition of the high-grade fines designated for sale.

At the start of Q3 2026, Kamoa-Kakula had approximately 40,000 tonnes of unsold copper held in inventory. This mainly consisted of unsold copper in concentrates held on-site and at LCS, as well as copper in the smelter circuit. At the end of Q3 2026, Kamoa-Kakula had approximately 43,000 tonnes of copper in inventory.

During the quarter, Kamoa-Kakula assayed, surveyed and tendered for sale 6,904 tonnes of high-grade copper fines, which were also added to copper held in inventory. High-grade copper fines are previously produced and stockpiled materials that were unable to be smelted, and have since been designated for sale to third parties. Additional stocks of high-grade copper fines are also expected to be assayed, surveyed and tendered for sale in Q4 2026.

Copper production in Q3 2026 continues to improve with higher mining rates across the complex

During Q3 2026, mining rates across the Kamoa and Kansoko increased by 30% to over 700,000 tonnes per month, equivalent to approximately 8.5 million tonnes per annum (Mtpa). The increase was driven by the mobilization of additional mining crews, new box-cut access into the Kamoa 1 Mine and the start of stoping.

In Q2 2026, construction of a new box cut to access the Kamoa Mine was completed. The new ‘Kahala’ box cut decline has been developing in ore since June 2026. A new decline into the Kansoko Mine is also currently under construction. The new ‘Kansoko Sud’ box cut was completed in Q2 2026, with a further 590 metres before decline development reaches ore.

Aerial view over the new Kahala box cut, which provides additional access to the Kamoa 1 underground mine. During H2 2026, copper production from the Kamoa-Kakula Copper Complex is supported by higher mining rates from across the complex.

The Phase 1 and 2 concentrators milled 30% more ore than the prior quarter, driven predominantly by additional ore supplied from Kakula and Kansoko. By quarter end, approximately 50% of the Phase 1 and 2 concentrator feed was from the western side of Kakula, with the remaining ore from the Kansoko mine.

Following the completion of Project 95 modifications to the Phase 1 and 2 concentrators in July, average concentrator recoveries during Q3 reached a record 89%. Since Q2, elevated silica levels in the copper concentrates have increased the production of slag concentrate by the smelter. While improvements to the concentrators are underway to reduce recovered silica and further improve copper recoveries, elevated production levels of slag concentrate are expected to continue for the foreseeable future.

Underground development rates at Kamoa and Kakula during Q3 advanced ahead of plan

At both the Kamoa and Kakula underground mines, development activities over the next 15 months are focusing on establishing long-term access and mine services ahead of stoping (production mining).

At Kakula, development is focused on establishing peripheral access drives around the edges of the orebody, in lower-grade areas, before stoping commences within the newly developed, high-grade mining areas.

Figure 1. Chart of underground development rates at Kamoa and Kakula versus quarterly targets (average linear meters of development advance per development drill rig per month).

As shown in Figure 1, average underground development rates in the third quarter were ahead of the 2026 target development rate of approximately 128 metres of advance per development drill rig per month. Since Q1, average development rates at Kakula have increased significantly, by approximately 38%. Linear development rates throughout the quarter at both Kamoa and Kakula were the highest on record. Target development rates across the complex are expected to rise to 135 metres of advance per development drill rig per month in Q4.

On-site, 500,000 tonnes-per-annum copper smelter remains at 60% of design capacity; local demand for smelter’s high-strength sulphuric acid continues to benefit from global supply chain disruptions

In line with concentrate production, the 500,000 tonnes-per-annum smelter continues to operate at approximately 60% of design capacity. In addition to copper anodes, the smelter produces high-strength sulphuric acid at an average rate of approximately 40,000 tonnes per month. This is equivalent to an annualized rate of approximately 480,000 tonnes per annum, compared with the design capacity of 700,000 tonnes per annum. Kamoa-Kakula sells sulphuric acid from the mine gate to nearby mining operations on the DRC Copperbelt that use it to leach copper and cobalt metal from oxide ores.

In the third quarter, the Kamoa-Kakula smelter produced 118,638 tonnes of high-strength sulphuric acid. The average net realized price for high-strength sulphuric acid sales during Q3 2026 approximately doubled, compared with the prior quarter, to approximately $900 per tonne. This includes an average net realized price during September of approximately $950 per tonne. Sulphuric acid prices are set to remain elevated into the fourth quarter.

Aerial view over Kamoa-Kakula’s state-of-the-art 500,000 tonnes-per-annum copper smelter. The smelter also produces high-strength sulphuric acid as a byproduct, which is sold to nearby oxide copper mines.

Kamoa-Kakula’s on-site hybrid solar facility with battery storage is fully operational, delivering 60 megawatts (MW) of continuous baseload power; power purchase agreements signed to double on-site hybrid solar capacity to 120 MW within 18 months

During the third quarter, construction and commissioning of Kamoa-Kakula’s on-site solar photovoltaic (PV) facilities, with battery energy storage system (BESS), was completed. By quarter end, both facilities were fully ramped up and operating at their combined nameplate capacity, delivering 60 MW of continuous baseload power to Kamoa-Kakula’s operations.

Construction of the two 30-MW facilities started in June 2025. The first 30-MW facility began delivering power in August 2026, and the second became operational in late September. Each 30-MW facility is owned, operated and funded by CrossBoundary Energy and Green World Energie.

Power generated by the combined 433-MW (peak capacity) PV facility is stored in the adjacent 1,107-megawatt-hour (MWh) battery storage facility. The facility delivers baseload power to Kamoa-Kakula’s operations, the sole offtaker, at a continuous rate of 60 MW over 24 hours. Together, the facilities are the largest hybrid solar installation at a mining operation in Africa, and therefore the largest of their kind.

The new on-site hybrid solar facility is fully ramped up and is delivering 60 MW of continuous baseload power to Kamoa-Kakula’s operations. The facility is the largest hybrid solar PV and battery storage facility installed by a mining company on the African continent.

Kamoa-Kakula is advancing plans to double the on-site hybrid solar PV power capacity, with BESS, to 120 MW within 18 months. In April 2026, Kamoa-Kakula awarded a contract and signed a 30-MW power purchase agreement (PPA) with Green World Energie. Kamoa-Kakula also awarded a further contract and signed a 30-MW power purchase agreement (PPA) with Lualaba Solar Company in August 2026. Both new facilities will also be constructed on Kamoa-Kakula’s joint-venture licence area.

**Watch a new video visualizing Kamoa-Kakula’s new hybrid solar facility with battery storage:

**https://vimeo.com/1231708435/44af3a0c07

Ramp up of on-site solar power facilities in September reduced on-site diesel generator consumption by approximately 40%

At the end of the second quarter, approximately 50% of on-site diesel consumption was consumed by the on-site back-up diesel-powered generators. The generators are more reliable than grid power for maintaining pumping operations across the complex. With the on-site hybrid solar facility now complete, the reliance on the backup diesel generators will decrease significantly.

The hybrid solar facility ramped up to full capacity on September 23. Compared with July, on-site generator diesel consumption fell by 40% in September. Diesel consumption is expected to fall further in the fourth quarter.

Kipushi concentrator produced a record 77,147 tonnes of zinc in Q3 2026, a quarter-on-quarter increase of 10%; production tracking towards the upper end of 2026 guidance

Summary of quarterly production data from Kipushi

| | | | | | |

| --- | --- | --- | --- | --- | --- |

| Kipushi Concentrator | Q3 2025 | Q4 2025 | Q1 2026 | Q2 2026 | Q3 2026 |

| Ore tonnes milled (tonnes) | 168,862 | 194,140 | 196,774 | 200,774 | 193,581 |

| Feed grade of ore milled (% zinc) | 37.81 | 36.18 | 36.96 | 38.71 | 41.58 |

| Zinc recovery (%) | 89.36 | 87.71 | 90.63 | 91.91 | 96.02 |

| Zinc in concentrate produced (tonnes) | 52,700 | 61,444 | 65,044 | 70,177 | 77,147 |

Scroll to view

Data in bold denotes a quarterly record.

The Kipushi concentrator produced a record 77,147 tonnes of zinc in concentrate in Q3 2026, up 10% quarter-on-quarter and equivalent to an annualized zinc production of approximately 309,000 tonnes. The quarterly performance was boosted by 193,581 tonnes of ore milled, a record feed grade of 41.6% zinc and a record concentrator recovery of 96%. In addition, the Kipushi concentrator produced a record 26,560 tonnes of zinc in July.

Kipushi’s Q3 2026 production marks the seventh consecutive quarter-on-quarter increase in zinc production, as shown in Figure 3. The Kipushi Mine is on track to achieve the upper end of its 2026 production guidance of 240,000 to 290,000 tonnes of zinc in concentrate.

Figure 2. Quarterly zinc in concentrate produced by the Kipushi concentrator (tonnes). The Q3 2026 production rate annualized is equivalent to 309,000 tonnes of zinc in concentrate.

Figure 3. World’s top 10 zinc mines by contained zinc production (‘000 tonnes), with head grade (% zinc). Kipushi is on track to meet 2026 production guidance, placing it among the top three zinc mining operations.

Notes. Source: Company Data, S&P Capital IQ.

*Denotes that company guidance not provided, in its place 2025 paid zinc production used as per S&P Capital IQ, 2026. Lanping Jinding excluded. Production for Kipushi is the 2026 guidance range as disclosed on January 14, 2026

Platreef’s Phase 1 operations continue ramp up

Summary of quarterly production data from Platreef Phase 1 commissioning

| | | | | |

| --- | --- | --- | --- | --- |

Publish date: 08 September 2026

Share:

Western Forelands ranks as the world’s largest and highest-grade copper discovery of the past decade

Western Forelands Indicated Mineral Resources now 42 million tonnes at 2.66% copper, plus Inferred Mineral Resources of 612 million tonnes at 1.80% copper (100% basis)

2026 Western Forelands 94,500-metre exploration drill program is largest-ever

Size of Makoko District expected to grow as ongoing drill results after March 31 not included in 2026 Mineral Resource

Ongoing drill program to be upsized in Q4 2026 to infill shallow mineralization with potential for open pit extraction

Route to first production at Makoko to benefit from prior rapid development of adjacent Kamoa-Kakula Copper Complex

Makoko scoping study to commence in Q1 2027

Project development expected to include multiple shallow open pits, driving lower capex and much faster development

Ivanhoe’s track record of discovering high-grade copper in the Western Forelands is the best in the world at a cost of <$0.01 per pound of copper

Ivanhoe Mines to host Investor Webinar at 10:30am ET today

Kolwezi, Democratic Republic of Congo–(Newsfile Corp. – September 8, 2026) – Ivanhoe Mines (TSX: IVN) (OTCQX: IVPAF) Executive Co-Chair Robert Friedland and President and Chief Executive Officer Marna Cloete are excited to announce the updated Mineral Resource estimate for the Makoko District, within Ivanhoe’s Western Forelands Exploration Project in the Democratic Republic of the Congo (DRC).

The Western Forelands Exploration Project consists of a majority-owned licence package covering 2,426 square kilometres, over six times larger than that of the adjacent Kamoa-Kakula Copper Complex. Within the Western Forelands lies the Makoko District, which is a series of genetically related world-class interconnected copper discoveries.

The 2026 Mineral Resource for the Makoko District provides an update from the last Mineral Resource, announced on May 14, 2025.

Since then, approximately 64,000 metres of diamond drilling have increased the contained copper by 30% to approximately 12 million tonnes. The 2026 Mineral Resource estimate uses mineable shape optimization (MSO) to constrain the reported Mineral Resources, unlike prior Makoko District estimates, which were reported directly from the block model.

**Watch a new video visualizing the Western Forelands’ 2026 Mineral Resource update:

**https://vimeo.com/1224774795/1777d26ac2

Ivanhoe Founder and Executive Co-Chairman Robert Friedland commented:

“The Western Forelands discoveries continue to grow explosively… confirming the area as the most important sedimentary-hosted copper basin on our planet… One might struggle to find a larger copper system that has been discovered in the past 30 years. Ivanhoe’s world-leading geologists have so far found over 55 million tonnes of copper in the basin… and they are confident they will continue to find additional world-class copper systems there for generations to come.

“Today’s interim update shows that the size of the Makoko District discovery within the Western Forelands continues to grow, firmly ranking Makoko by far as the world’s largest and the highest-grade new copper discovery of the past decade… in an era when the desperate cries for new sources of copper are getting louder and fewer copper discoveries are being made.

“As the copper resource expands…so does our excitement and confidence. We plan to intensify our efforts this year by, yet again, increasing the size of the in-fill and step-out drilling program. Our subsequent Mineral Resource update will include both additional metres and the projected 60,000 metres of drilling from this year’s drill program that were not included in today’s update.

“Our track record of copper discovery in the Western Forelands is unrivaled… We are discovering copper at an absurdly high discovery rate of 100 million pounds of contained copper for every 1,000 metres drilled… and at an exceptionally low discovery cost of a fraction of a penny per pound of high-grade copper discovered. Our ability to find high-grade copper systems at such low cost is the very definition of creating shareholder value.

“We plan for scoping study work to commence soon, which will include mining some of the highest-grade, open pit copper mines in the world.”

Investor Webinar on Tuesday, September 8, 2026

Ivanhoe Mines will host an investor webinar today at 10:30 a.m. Eastern Time / 7:30 a.m. Pacific Time to discuss the updated Mineral Resource Estimate for the Makoko District. The webinar will conclude with a question-and-answer (Q&A) session.

To view the webinar, use the link:

https://meetings.lumiconnect.com/400-379-304-323

Participants Dial-in Numbers:

Local – Toronto: +1 (416) 855-9085

Toll Free – North America: +1 (800) 990-2777

Conference ID: 33298

An audio webcast recording of the webinar, together with supporting presentation slides, will be available on Ivanhoe Mines’ website at www.ivanhoemines.com

.

Following issuance, the updated Mineral Resource Estimate will be available at www.ivanhoemines.com

and at www.sedarplus.ca

.

The Makoko District’s contained copper has grown significantly; mineralization remains open in multiple directions for further resource expansion.

The Makoko discovery, within the Western Forelands Exploration Project, was made in 2018 when step-out drilling from Kakula intersected geologically identical flat-lying, sedimentary-hosted copper mineralization west of the Kamoa-Kakula joint venture. Subsequent drilling has discovered a continuously mineralized region, now called the Makoko District, which encompasses the three discoveries of Makoko, Makoko West, and Kitoko.

The maiden Makoko Mineral Resource estimate was released on November 13, 2023, with a further Mineral Resource update, which included the adjacent Makoko West and Kitoko discoveries, announced on May 14, 2025

. Since the maiden Mineral Resource of Makoko, the strike length of the Makoko District has increased by over 400% to 16 kilometres and the total combined area has increased by 300% to 61 square kilometres, as shown in Figure 1.

Mineralization of the Makoko District remains open to the northeast and downdip of the current footprint, with potential for further resource expansion, as illustrated in Figure 1.

Figure 1. The Makoko District’s 2026 Mineral Resource outline, overlaid with copper grade.

Notes: Mineral Resource Data Source: The block model and resource outlines illustrated are based on the Mineral Resource Estimate for the Makoko West and Kitoko, combined form the Makoko District.

Resources are reported separately in the text as Indicated and Inferred classifications and are visually distinguished on the map by the 2026 Indicated (red outline) and 2026 Inferred (black outline) boundaries.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Inferred Mineral Resources have a lower level of geological confidence than Indicated Mineral Resources and may not be converted to Mineral Reserves. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category.

Exploration Potential and “Open” Labels: The red arrows and annotations labelled “Open” indicate areas of prioritized exploration potential outside the current defined 2026 Mineral Resource boundary. These areas are conceptual in nature. There has been insufficient exploration drilling within these specific “Open” vectors to delineate them as Mineral Resources, and it is uncertain whether further exploration drilling will result in these areas being converted to Mineral Resources.

Drill holes highlighted on this map outside the Mineral Resource boundary include completed holes with final laboratory assay results available as of March 31, 2026.

Drilling is primarily vertical and broadly perpendicular to mineralization; therefore, true widths of copper mineralization intersections are estimated to be 85% to 90% of the reported downhole drill lengths unless otherwise stated.

Analytical data has been verified using industry-standard QA/QC programs, including the insertion of certified reference standards, blanks, and duplicates

The Western Forelands is by far the world’s largest copper discovery of the past decade

In the 15 months between the 2025 Mineral Resource and the 2026 Mineral Resource update, approximately 64,000 metres of drilling have been completed across 106 holes. The drilling has added approximately 130,000 tonnes of contained copper in the Indicated Mineral Resource category, an increase of 17%. In addition, 2.63 million tonnes of contained copper have been added to the Inferred category, an increase of 31%.

Makoko District’s Mineral Resources are now 34 million tonnes at 2.66% copper in the Indicated category, plus 612 million tonnes at 1.80% copper in the Inferred category. The Kiala deposit, which was discovered in 2020, remains unchanged at 8 million tonnes at 2.67% copper.

The Makoko District has higher-grade sub-zones that mirror the mineralization style of the Kamoa orebody, which feeds the adjacent Kamoa-Kakula Copper Complex’s Phase 3 concentrator and will feed the future Phase 4 concentrator.

The Western Foreland’s Makoko District and Kiala deposits, together rank as the largest and highest-grade copper discovery of the past decade, as shown in Figure 2.

Figure 2. The top 10 copper discoveries of the past decade, with the Western Forelands ranking as the world’s largest and highest-grade. Ivanhoe’s geologists have now discovered over 55 million tonnes (121 billion pounds) of contained copper in the Western Foreland shelf, including Makoko District, Kiala, and Kamoa-Kakula Copper Complex.

Source: Company filings, S&P Global Market Intelligence

Notes: Chart ranks new copper discoveries made since 2015 based on contained copper in resources, on a 100% basis. Data source is S&P Global Market Intelligence article, dated August 27, 2026. Measured, Indicated and Inferred Mineral Resources are separate categories and should not be added. Data source is the S&P Global Market Intelligence article dated August 27, 2026. Mineral Resource estimates for the Western Forelands include the Makoko District (Makoko, Makoko West and Kitoko) and Kiala at a 1.0% copper Western Forelands data has not been reviewed by S&P Global. Discovery is defined by the date of the first drill hole in the past 10 years; resource figures reflect the latest Mineral Resource estimate.

Ivanhoe’s geologists in the Western Forelands have achieved the industry’s lowest cost of discovery and the greatest rate of delineating contained high-grade copper

The total copper endowment discovered across the Western Forelands has been at an industry-leading low cost of less than $10 per tonne of copper (<$0.005 per pound of copper). London Metal Exchange (LME) copper prices have also increased by 78% since the maiden Mineral Resource, from $8,167 per tonne on November 13, 2023, to a high of $14,530 per tonne on September 7, 2026.

Figure 3. See below the world-leading growth of contained copper (million tonnes) in the Western Forelands since the maiden Mineral Resource estimate in 2023, against total drilling completed in the Western Forelands since 2017 (kilometres). In just 2.5 years since the maiden Mineral Resource, Ivanhoe’s geologists have significantly increased the contained copper in Mineral Resources, while the copper price has also risen by 78%.

Notes: Resource updates are plotted on the cut-off date for drill & assay data.

(1) 2023 maiden Mineral Resource, September 3, 2023: Indicated Resources total 24 million tonnes at a grade of 3.29% copper, containing 0.8 million tonnes of copper at a 1% copper cut-off, and Inferred Resources total 243 million tonnes at a grade of 1.7% copper, containing 4.17 million tonnes of copper at a 1% copper cut-off.

(2) 2025 Mineral Resource, December 31, 2026: Indicated Resources total 36 million tonnes at a grade of 2.76% copper, containing 1.0 million tonnes of copper at a 1% copper cut-off, and Inferred Resources total 494 million tonnes at a grade of 1.7% copper, containing 8.39 million tonnes of copper, at a 1% copper cut-off.

(3) 2026 Mineral Resource, March 31, 2026: Indicated Resources total 42 million tonnes at a grade of 2.66% copper, containing 1.1 million tonnes of copper at a 1% copper cut-off, and Inferred Resources total 612 million tonnes at a grade of 1.8% copper, containing 11.02 million tonnes of copper, within mineable shapes, optimized at a 1% copper cut-off.

Figure 4. Analysis of major copper discoveries made over the past 30 years. The rate of copper discoveries made has been declining from approximately 10 per year between 20 and 30 years ago, to approximately one a year for the past 10 years. Ivanhoe Mines has consistently been the world leader in major copper discoveries.

Source: S&P Market Intelligence

(1) Oyu Tolgoi was not part of today’s version of Ivanhoe Mines Ltd. (IVN:TSX). On August 2, 2012, the old version of Ivanhoe Mines was renamed to Turquoise Hill Resources, which was subsequently fully acquired by Rio Tinto on December 16, 2022

Approximately 70% of the 2026 Makoko District diamond drilling program is complete

The 2026 Western Forelands drilling program is Ivanhoe Mines’ largest to-date, with more than 80,000 metres of diamond core drilling and 14,500 metres of reserve circulation drilling planned.

The diamond drilling program is focused on three principal areas of the Makoko District: step-out to the east and to the southwest, as well as infill drilling between Makoko and Makoko West. Up to nine diamond drill rigs have been operating since the start of the year. Approximately 70% of the 2026 diamond drilling program was completed by August, with 55,700 meters drilled.

Approximately 20,000 metres of diamond drilling were completed in the first quarter, the assays of which are included in the 2026 Mineral Resource update. Results from the remaining 60,000 metres of 2026 diamond drilling program will be included in a further Mineral Resource update in 2027.

Highlights of the Makoko District 2026 Mineral Resource estimate

The updated 2026 Mineral Resource estimate for the Makoko District was prepared by Ivanhoe Mines in accordance with the CIM 2014 Definition Standards for Mineral Resources and Mineral Reserves.

Publish date: 04 September 2026

Share:

Toronto, Ontario–(Newsfile Corp. – September 4, 2026) – Ivanhoe Mines (TSX: IVN) (OTCQX: IVPAF) will announce an update on the company’s majority-owned Western Forelands Exploration Project before market open on Tuesday, September 8, 2026.

In addition, the Company will host an investor webinar on the same day at 10:30 a.m. Eastern Time / 7:30 a.m. Pacific Time to discuss the update. The webinar will conclude with a question-and-answer (Q&A) session.

To view the webinar, use the link: https://meetings.lumiconnect.com/400-379-304-323

**Participants Dial-in Numbers:

**Local – Toronto: +1 (416) 855-9085

Toll Free – North America: +1 (800) 990-2777

Conference ID: 33298

An audio webcast recording of the webinar, together with supporting presentation slides, will be available on Ivanhoe Mines’ website at www.ivanhoemines.com

.

Prompts

Ivanhoe Mines Ltd. (ticker IVN), listed in Canada.

ETFs Holding Ivanhoe Mines Ltd.

ETF Weight in ETF Shares Market value As of
CGXU 0.66% 8,378,613 $ 42.185M Nov 16, 2026
CGNG 0.15% 895,825 $ 4.51M Nov 16, 2026
CGIC 0.11% 580,815 $ 2.924M Nov 16, 2026
UPAR 0.05% 5,082 $ 25.577K Nov 17, 2026
RPAR 0.03% 33,185 $ 167.015K Nov 17, 2026
DXIV 0.03% 12,900 $ 71.365K Nov 12, 2026
DFIC 0.02% 691,539 $ 3.826M Nov 12, 2026
DFIV 0.02% 997,878 $ 5.52M Nov 12, 2026
DFAX 0.02% 382,777 $ 2.118M Nov 12, 2026
DFAI 0.01% 434,371 $ 2.403M Nov 12, 2026
DISV 0.00% 33,030 $ 182.728K Nov 12, 2026
DFIS 0.00% 5,105 $ 28.242K Nov 12, 2026
AVDE 0.00% 182,405 $ 918.371K Nov 16, 2026