Imperial Metals Corporation is a mining company focused on the exploration, development, and production of base and precious metals, primarily copper and gold. Established in 1959, the company has operated mines in British Columbia since 1991. Its key assets include the Mount Polley copper-gold mine and the Red Chris copper-gold mine, the latter held through a joint venture with Newmont Corporation, which serves as the operator. The company also owns the Huckleberry mine, which is currently on care-and-maintenance, and previously operated the Goldstream mine. Imperial maintains a portfolio of exploration projects throughout British Columbia, including Ruddock Creek, Sustut, Whiting Creek, and Fandora. The company’s operations are concentrated in the province, with a focus on porphyry deposits.

Summarised from the company's own disclosures, fiscal year ended Dec 2025

Industry Other Industrial Metals & Mining Homepage imperialmetals.com
Sector Basic Materials IR page imperialmetals.com/investors
Tags
copper mining, gold mining, base metals, precious metals, porphyry deposits, mine development, exploration, Mount Polley, Red Chris, Huckleberry, Goldstream, Newmont Corporation, Ruddock Creek, Sustut, Whiting Creek, Fandora
Press page imperialmetals.com/news

Metrics

Valuation  
Market cap C$ 1.11B
Market cap (USD) $ 776.194M
P/E 8.30
PEG —
P/BV —
P/S 1.61
P/OCF -291.05
P/FCF —
Dividend yield —
Turnover / mcap —
Returns  
ROE 16.6%
ROI 15.0%
ROIC 15.0%
Profit margin 22.2%
Growth  
Revenue growing Yes
Profits growing Yes
Revenue up 3y Yes
Revenue up 5y No
Earnings growth 3y (net profit CAGR) —
Quality  
Profitable Yes
Margin expanding Yes
Buying back stock —
Diluting (TTM) —
Debt/Equity —
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 0
Quality score 64.3%
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021 FY 2020 FY 2019 FY 2018
Revenue 691.781M 494.371M 344.455M 172.797M 133.591M 148.097M 71.823M 104.437M
Net profit 153.78M 106.261M -36.715M -75.975M -26.07M -4.892M 321.736M -125.595M

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

October 28, 2026 View PDF

Vancouver | October 28, 2026 | Imperial Metals Corporation (“Imperial” or the “Company”) (TSX:III) reports assay results from its spring 2026 diamond drilling program at the Porcher Island property, located 35 kilometres south-southwest of Prince Rupert, British Columbia (see Figure 1).

Ten drill holes totalling 1,380 metres were completed from four helicopter supported drill pads. All drill holes intersected gold (Au) and silver (Ag) mineralization.

Significant Intervals from the 2026 program include:

Table 1: Porcher Island 2026 Drilling – Significant Intercepts

*Reported intersections based on a 0.1 g/t gold cut-off with a maximum of 5 metre internal dilution below cut-off.

The Porcher Island property (100% owned by Imperial) is located on the northwest corner of Porcher Island on the northern coast of British Columbia. It hosts two past producing gold mines, Edye Pass and Surf Point mines, that operated from 1919 to 1939 when the last operating mill burned down. Historic production is estimated at 77,952 tons grading 0.29 oz/ton gold from both mines.

Gold mineralization is hosted in shear zones and quartz veins developed within a quartz diorite stock. Gold is associated with pyrite occurring as disseminations, stringers and semi-massive accumulations, with trace chalcopyrite and molybdenum, and elevated tellurium.

In 2007, nine angled drill holes completed from three south-dipping drill fans intersected multiple intervals grading more than 2.0 g/t gold. The drilling outlined a cluster of near surface gold mineralization now known as the Christmas Tree zone (see Figure 2).

Figure 1: Plan Map of site showing the location of the drill pads

Table 2: Significant intersections from the 2007 drilling program on the Christmas Tree zone include:

The strongest gold intercept from the 2026 program was returned from drill hole PI-26-10 in the Christmas Tree zone. Drilled vertically from the same pad used for the 2007 holes, PI-26-10 tested the zone’s northern extension and intersected 45.5 metres grading 1.24 g/t gold, including 17.0 metres grading 2.25 g/t gold and 5.0 metres grading 5.51 g/t gold.

The three other drill pads used during the 2026 program were positioned along structures north and west of the Christmas Tree zone and tested the down-dip extensions of gold-bearing quartz veins sampled in historical underground workings. Significant intercepts include 4.5 metres grading 4.77 g/t gold from 75.5 metres in drill hole PI-26-02 and 2.3 metres grading 3.63 g/t gold from 12.0 metres in drill hole PI-26-08.

The 2026 drill results will be integrated into the existing project database and interpreted to support planning for additional exploration at the Porcher Island property. In the current strong gold price environment, Imperial will continue to pursue options to reveal value at Porcher Island project, including completing ore sorting test work to consider the potential for direct ore shipping. This concept is highly attractive for a project like Porcher Island since it sits at tide water for ease of ocean transportation options and also would eliminate the need for a processing plant or tailings storage. This would significantly reduce capital requirements and environmental footprint of a potential mining operation.

Figure 2: Figure showing cross section plan map and cross section of Christmas Tree zone

Jim Miller-Tait, P.Geo., Imperial’s Vice President Exploration, has reviewed this news release as the designated Qualified Person as defined by National Instrument 43-101 for the Porcher Island exploration program.

The Porcher Island samples reported were analyzed at Activation Laboratories Ltd. located in Kamloops. A full QA/QC program using blanks, standards and duplicates was completed for all diamond drilling samples submitted to the labs. Reported assay intervals represent apparent widths of mineralization. Insufficient geological information is available to confirm the geological model and true width of the mineralized intervals.

Table 3: 2026 Complete Drillhole data

Porcher Island Project, British Columbia, Canada

Reporting Criteria: Intercepts reported are downhole drill width (not true width). Gold and silver grades are reported to two significant figures. Samples are from core drilling which is NQ in diameter. Core is photographed and logged by the geology team before being cut. Half core NQ samples are prepared for assay and the remaining material is retained in the core lay down area for future reference. Each assay batch is submitted with duplicates and standards to monitor laboratory quality. Reported intersections based on a 0.1 g/t gold cut-off with a maximum of 5 metre internal dilution below cut-off.

About Imperial

Imperial is a Vancouver based exploration, mine development and operating company with holdings that include the Mount Polley mine (100%), the Huckleberry mine (100%), and the Red Chris mine (30%). Imperial also holds a portfolio of 21 exploration properties in British Columbia. 

Company Contacts

Brian Kynoch | President | 604.669.8959
Jim Miller-Tait | Vice President Exploration | [email protected]

Steve Robertson | Vice President Corporate Development | 604.669.8959

Cautionary Note Regarding Forward-Looking Statements

Certain information contained in this news release are not statements of historical fact and are “forward-looking” statements. Forward-looking statements relate to future events or future performance and reflect the Company’s management’s expectations or beliefs regarding future events and include, but are not limited to, statements regarding the Company’s plan to: incorporate the 2026 exploration drilling results and identified mineralization at the Porcher Island project into the existing database; interpret the results to assist with planning additional exploration on the property; and complete ore sorting test work to consider the potential for direct ore shipping which, if proven and adopted, would eliminate the need for a processing plant or tailings storage and significantly reduce capital requirements and environmental footprint of a potential mining operation.

In certain cases, forward-looking statements can be identified by the use of words such as “plans”, “expects” or “does not expect”, “is expected”, “outlook”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.

In making the forward-looking statements in this news release, the Company has applied certain factors and assumptions that are based on information currently available to the Company as well as the Company’s current beliefs and assumptions. These factors and assumptions and beliefs and assumptions include the risk factors detailed from time to time in the Company’s annual information form, interim and annual financial statements and management’s discussion and analysis of those statements, all of which are filed and available for review on SEDAR+ at www.sedarplus.com . Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended, many of which are beyond the Company’s ability to control or predict. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and all forward-looking statements in this news release are qualified by these cautionary statements.

Subscribe for Email Updates:

First Name *

Last Name *

Your Email *

Submit

Imperial Metals Corporation

© 2026 Imperial Metals Corporation. All rights reserved.

Contact | Legal Notice | Privacy Statement

Website by Proactive Digital Solutions

GDPR Cookie Banner

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in settings.

Accept

Change cookie settings

Close GDPR Cookie Settings

Favicon

  • Privacy Overview
  • Necessary
  • Analytics
  • Cookie Policy

Powered by  GDPR Cookie Compliance (opens in a new tab)

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Necessary

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Enabled Disabled

Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.

Enabled Disabled

Cookie Policy

More information about our Cookie Policy

Enable All Save Settings

October 22, 2026 View PDF

Vancouver | October 22, 2026 | Imperial Metals Corporation (“Imperial”) (TSX:III) reports advancement on the definitive feasibility study for the Red Chris Block Cave mine, as well as the mine production from Red Chris and Mount Polley mines for 2026 third quarter. The following description of the Red Chris Block Cave update is largely adopted from Newmont Corporation (“Newmont”) released information earlier today.

RED CHRIS BLOCK CAVE PROJECT

Initial Development Establishes Foundation for Potential 70-Year Copper-Gold Operation:

The Red Chris Block Cave project is a large-scale copper-gold opportunity located in the Golden Triangle of British Columbia, Canada (Figure 1). The project is designed to mine the porphyry copper-gold system beneath the existing open pit and includes an underground block cave mine, expansion of existing processing facilities, and upgrades to site infrastructure unlocking higher-grade mineralization at depth. Imperial has a 30% ownership interest in Red Chris project through a joint venture in partnership with the project operator, Newmont. The feasibility study is nearing completion, subject to review and governance oversight with a full funds investment decision now expected in early 2027. 

Advancement in the feasibility study now reflects a more complete view of the investment requirements, schedule and production profile. On a 100% ownership basis1, the first phase of the project is expected to produce 3.0 million ounces of gold and more than 1.8 billion pounds of copper over its initial thirteen-year cave life.

Subject to approval by the Red Chris Joint Venture, construction of the Red Chris Block Cave is expected to commence in 2027, with first production targeted for 20332. The project is expected to ramp up to an average between 275 and 325 thousand ounces of gold per year, and between 145 and 187 million pounds of copper per year between 2035 and 20403.

The Red Chris mine has the potential for up to 70 years of mine life. The initial block cave project (see Figure 2) establishes the foundation for subsequent phased development, including additional macro blocks, the East Ridge, and other high confidence exploration targets, which are not included in the project metrics presented above. Forty percent of the planned upfront investment in processing facilities, material handling systems and other key infrastructure is expected to support potential future expansions, providing significant long-term optionality across the project and the broader Golden Triangle district.

The Golden Triangle has been prioritized by both the Provincial Government of British Columbia and the Federal Government of Canada as a region of national importance. Critical minerals, indigenous partnerships, clean energy infrastructure, and Northwest B.C. economic development have been identified as strategic priorities, resulting in enhanced policy support, regulatory attention, and infrastructure investment in the region. In July 2026, the Government of Canada announced a $500 million contribution to support the project, reinforcing Red Chris as a nationally significant critical minerals project. The Red Chris Joint Venture is continuing to work with the Canadian government to finalize the terms of the grant and expects to reach an agreement in the coming months.

The project is expected to benefit from several strategic advantages, including:

  • Development in British Columbia, a leading, stable mining jurisdiction
  • Expected to deliver double-digit IRR4
  • Expected to be a low-cost operation over life-of-mine
  • Tahltan Nation consent decision and B.C. Environmental Certificate Amendment, along with major mines permits provide regulatory and social license certainty until the end of the project
  • Existing mature operation, including processing facilities, tailings infrastructure, road access, camp facilities and site services
  • Access to established port at Stewart, B.C. for exports and delivery of project materials
  • Reliable access to clean, hydroelectric power supplied by B.C. Hydro, the provincial electricity utility
  • Knowledge of the Red Chris orebody and mineralogy from current operations
  • Newmont’s global block cave expertise, including experience at Cadia
  • Growth opportunities, including additional macro blocks, East Ridge Resources and other targets on and near the Red Chris project

As the feasibility study nears completion, the project has already achieved several key milestones, including the receipt of amended regulatory approvals from the Province of British Columbia in June 2026 that enable the transition from open pit mining to block caving. The amended Environmental Assessment Certificate was achieved through a consent-based process with the Tahltan Nation, reflecting a shared commitment to responsible resource development, meaningful Indigenous participation and long-term benefits for local communities.

The total estimated development capital for the project incorporating the $500 million grant from the Government of Canada for the development of critical minerals projects5, will be released by Imperial following completion of a National Instrument 43-101 technical report prepared for Imperial based on the feasibility study completed by Newmont.

The Red Chris Joint Venture will continue to validate the underlying assumptions and execution plan as the feasibility study is finalized ahead of the anticipated full funds investment decision in early 2027. An investment decision remains subject to the approval of Red Chris Joint Venture.

PRODUCTION UPDATE

Imperial Metals reports copper and gold production for the third quarter of 2026 from Red Chris and Mount Polley mines. Imperial’s third quarter consolidated production from its 30% share of Red Chris and 100% of Mount Polley is 8.535 million pounds of copper and 11,648 ounces gold. Imperial anticipates the consolidated metal production for Mount Polley and Red Chris will achieve the guidance of 79 – 87 million pounds copper and 87,500 – 96,500 ounces gold for 2026.

Red Chris Mine Production:

Red Chris metal production (100%) for the third quarter of 2026 was 14.771 million pounds copper and 12,391 ounces gold, compared to 20.900 million pounds copper and 21,660 ounces gold produced during the same quarter of 2025. The decrease in metal production was a result of lower copper and gold grades and recoveries, slightly offset by a 17% increase in throughput. Both copper and gold production were down compared with the third quarter of 2025, with copper production down 29% and gold production down 43%. Imperial’s 30% share of Red Chris mine production was 4.431 million pounds copper and 3,717 ounces gold.

Both copper and gold production remain on track to achieve the budgeted 2026 production.

Mount Polley Mine Production:

Production in the third quarter of 2026 at Mount Polley mine was 4.104 million pounds compared with 7.655 million pounds in the third quarter of 2025 and gold production was 7,931 ounces versus 9,285 ounces in the comparative 2025 quarter. Metal production was down compared to the 2025 third quarter on lower metal grades and lower copper recovery. Copper production was up 21% and gold production was up 16% in the third quarter compared to the second quarter of this year, establishing a trend for better performance at Mount Polley. The current mine plan targets of 5.8 million pounds copper and 11,000 ounces gold to be produced in the current fourth quarter, indicate a continuation of the positive trend.

Throughput accelerated substantially later in the summer with an average 22,875 tonnes per day through August and September, compared to 17,260 in the January through July period, as some changes in the grinding circuit operating practices and equipment were implemented.

Mill feed for the third quarter of 2026 was sourced 18% from the Springer pit Phase 5 pushback supplemented by 16% from Phase 4, 19% from C2 pit and 46% from stockpiles. The high percentage of low-grade stockpile material resulted in lower copper and gold head grade. In the fourth quarter of 2026 higher-grade material from Phase 5 will begin to be delivered to the mill and reduce or eliminate the need to process lower grade stockpiles.

The Boundary pit is a small, high strip ratio but high-grade pit, with an estimated reserve of 592,039 tonnes at a grade of 0.65% copper, 0.58 g/t gold and 4.39 g/t silver (Reference 2025 Annual Information Form ). Waste stripping at Boundary pit took place throughout the third quarter, with approximately 300,000 tonnes of waste rock removed, and a minimal tonnage of ore mined. This early development work positions the Boundary pit to begin to contribute higher-grade ore in the fourth quarter.

Non-acid generating (NAG) waste was placed on both the buttresses and embankments of the tailings storage facility (TSF), totaling approximately 2.5 million tonnes. In addition to the NAG placement, work progressed steadily on the TSF embankment raise and 987 buttress foundation preparation and water management infrastructure.

Mount Polley is delayed with delivery of ore from Phase 5, and it will be difficult to meet the range of guidance estimated at the beginning of the year. Initiation of mining at the Boundary zone was commenced ahead of schedule to attempt to offset the delay in Phase 5 ore delivered to the plant. The revised guidance for 2026 production at Mount Polley is 16 – 18 million pounds of copper and 30,500 – 33,700 ounces gold.

Footnotes:
1 Imperial Metals (TSX:III) owns 30% of the Red Chris Joint Venture in partnership with Joint Venture operator Newmont Corporation. The feasibility study and a full funds decision regarding the project requires approval of the Red Chris Joint Venture.
2 Please refer to the cautionary statement and footnotes for further information regarding forward-looking statements.
3 Development capital estimates are presented on a 100% ownership basis, include contingency and are net of $500 million in anticipated Canadian government support. Estimates exclude costs to transition from open pit to block cave operations. Canadian dollar amounts converted to U.S. dollars at C$1.00 = US$0.75. See cautionary statement regarding forward-looking statements and project estimates.
4 Evaluated across a range of economic scenarios, including gold at $3,600/oz and copper at $5.00/lb.
5 Final terms of the grant are expected to be finalized before the end of 2026.

Steve Robertson, P. Geo., Imperial’s Vice President Corporate Development, has reviewed the above disclosures contained in this news release and is the designated Qualified Person as defined by National Instrument 43-101.

—

About Imperial

Imperial is a Vancouver based exploration, mine development and operating company with holdings that include the Mount Polley mine (100%), the Huckleberry mine (100%), and the Red Chris mine (30%). Imperial also holds a portfolio of 20 greenfield exploration properties in British Columbia.

Company Contacts

Brian Kynoch | President | 604.669.8959
Steve Robertson | Vice President Corporate Development | 604.669.8959

Cautionary Note Regarding Forward-Looking Statements

Certain information contained in this news release are not statements of historical fact and are “forward-looking” statements. Forward-looking statements relate to future events or future performance and reflect Imperial management’s expectations or beliefs regarding future events and include, but are not limited to, statements regarding Imperial’s expectation that completion of the ongoing feasibility study for the proposed Red Chris block cave mine and, subject to study outcomes, joint venture approval are expected by early 2027; Red Chris block cave construction will have commenced in 2027 and first production targeted for 2033; estimated copper and gold production (on a 100% ownership basis) for the Red Chris mine block cave over the first 13-year cave-life; estimated average Red Chris production for gold and copper between 2035 and 2040; update to the development capital in early 2027; estimated 70-year potential Red Chris mine life with forty percent of planned upfront investment in key infrastructure expected to support potential future expansion; expected benefits from enumerated strategic advantages; expectations that the terms of the $500 million federal grant will be finalized in the coming months; expectations that the Red Chris mine will achieve its budgeted 2026 copper and gold guidance; expectations that, although mining at the Boundary zone was commenced ahead of schedule to attempt to offset the delay in Springer pit Phase 5 ore being delivered to the plant, the Mount Polley mine will likely not meet the range of its budgeted 2026 copper and gold guidance; and other risks outlined in statements made by Imperial from time to time in the filings made by Imperial with securities regulators. Imperial disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events, or otherwise, except as otherwise required by applicable securities legislation.

In certain cases, forward-looking statements can be identified by the use of words such as “plans”, “expects” or “does not expect”, “is expected”, “outlook”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Imperial to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.

In making the forward-looking statements in this news release, Imperial has applied certain factors and assumptions that are based on information currently available to Imperial as well as Imperial’s current beliefs and assumptions. These factors and assumptions and beliefs and assumptions include, the risk factors detailed in Imperial’s current Annual Information Form, and detailed from time to time in Imperial’s interim and annual financial statements and management’s discussion and analysis of those statements, all of which are filed and available for review on SEDAR+ at www.sedarplus.ca. Although Imperial has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, imperialmetals.com events or results not to be as anticipated, estimated or intended, many of which are beyond Imperial’s ability to control or predict. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and all forward-looking statements in this news release are qualified by these cautionary statements.

Subscribe for Email Updates:

First Name *

Last Name *

Your Email *

Submit

Imperial Metals Corporation

© 2026 Imperial Metals Corporation. All rights reserved.

Contact | Legal Notice | Privacy Statement

Website by Proactive Digital Solutions

GDPR Cookie Banner

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in settings.

Accept

Change cookie settings

Close GDPR Cookie Settings

Favicon

  • Privacy Overview
  • Necessary
  • Analytics
  • Cookie Policy

Powered by  GDPR Cookie Compliance (opens in a new tab)

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Necessary

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Enabled Disabled

Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.

Enabled Disabled

Cookie Policy

More information about our Cookie Policy

Enable All Save Settings

August 6, 2026 View PDF

Vancouver | August 6, 2026 Imperia Metals >Corporation (the “Company” or “Imperial”) (TSX:III) reports financial results for the three and six months ended June 30, 2026. Imperial’s consolidated production for the second quarter of 2026 totalled 8,759,242 pounds copper and 11,226 ounces gold.

“We completed a very strategic quarter for Imperial as both mines, Mount Polley and Red Chris, received key authorizations that extend their permitted mine life. At Mount Polley, we worked through some lower grade ore to position the operation for access to higher grade mineralization that will be exposed for mining later this year”, said the President, Brian Kynoch. “Supported by good copper and gold prices, we continued investing in our operations even during this period of lower grades from both mines. The permits received for the tailing dam raise at Mount Polley and transition to block cave mining at Red Chris position the Company to deliver returns in the coming years.”

FINANCIAL

Total revenue was $166.5 million in the June 2026 quarter compared to $175.8 million in the 2025 comparative quarter.

In the June 2026 quarter, Mount Polley mine had 1.0 concentrate shipments (2025-1.9 concentrate shipments). The Red Chris mine (100% basis) had 4.0 concentrate shipments (2025-5.0 concentrate shipments).

Variations in revenue are impacted by the timing and quantity of concentrate shipments, metal prices and exchange rates, and period end revaluations of revenue attributed to concentrate shipments where copper and gold prices will settle at a future date.

At June 30, 2026, the Company had not hedged any copper, gold or US/CDN Dollar exchange.

Revenue revaluation for the June 2026 quarter was $4.6 million, compared to $2.2 million in the comparative quarter of 2025. Revenue revaluations arise from changes in metal prices between the initial recognition of revenue and the settlement date and/or the reporting balance sheet date, together with adjustments to payable metal quantities following receipt of final assay results.

Net income for the June 2026 quarter was $22.0 million ($0.12 income per share) compared to net income of $40.6 million ($0.25 income per share) in the 2025 comparative quarter. The decrease in net income of $18.6 million was primarily due to the following factors:

  • Income from mine operations decreased to $47.3 million in the June 2026 quarter from $81.3 million in the June 2025 quarter, a decrease of $34.0 million, partially offset by:
  • Net interest expense decreased to $3.6 million in the June 2026 quarter from $6.8 million in the June 2025 quarter, increasing net income by $3.2 million; and
  • Tax expense decreased to $13.5 million in the June 2026 quarter from $26.5 million in the June 2025 quarter, increasing net income by $13.0 million.

Capital expenditures including leases were $67.0 million in the June 2026 quarter, an increase of $2.9 million from $64.1 million in the 2025 comparative quarter. The June 2026 quarter expenditures included $29.8 million in exploration and development, $12.4 million for tailings dam construction and $24.8 million of other capital.

OPERATIONS

During the quarter ended June 30, 2026, Imperial’s consolidated metal production was 8.8 million pounds copper (Q2 2025-16.5 million pounds copper) and 11,226 ounces gold (Q2 2025-17,848 ounces gold).

Mount Polley Mine

Mount Polley metal production for the second quarter of 2026 was 3.382 million pounds copper and 6,848 ounces gold, compared to 9.496 million pounds copper and 11,061 ounces gold produced during the second quarter of 2025. Copper production was down 64% and gold production was down 38%, on lower grades, recoveries and throughput compared to the second quarter of 2025. Throughput in the second quarter of 2026 was 18,498 tonnes per day compared to 19,331 tonnes per day in the second quarter of 2025. Compared to the first quarter of 2026, throughput was up 12%, copper production was down 23% and gold production was down 10%.

Mill feed for the second quarter of 2026 was sourced 44% from the Springer pit Phase 5 pushback supplemented by 15% from Phase 4 and C2 pit, and 41% from lower grade stockpiles. The high percentage of low-grade stockpile material delivered to the mill resulted in lower copper and gold grades being milled. By the fourth quarter of 2026 higher grade material from Phase 5 should begin to be delivered to the mill and reduce or eliminate the need to process lower grade stockpiles.

Stripping activities for the Phase 5 pushback continued during the quarter with approximately 6.032 million tonnes of rock mined from this pushback. Approximately 2.725 million tonnes of non-acid generating rock from the pushback were delivered to the tailings storage facility embankment for buttress construction.

Exploration program

Diamond drilling started in February 2026 and initially followed up on the successful results from the first drilling campaign at the Mount Polley mine in more than a decade in the Bell Pit area. Since February 2026, there have been 41 diamond drill holes completed totaling 8,620 metres focusing on the historic Bell Pit area, the expansion of the Cariboo Zone laterally and to depth.

Exploration, development, and capital expenditures in the second quarter of 2026 were $30.3 million compared to $33.7 million in the 2025 comparative quarter.

Red Chris Mine

Red Chris production (100%) for the second quarter of 2026 was 17.924 million pounds copper and 14,591 ounces gold compared to 23.479 million pounds copper and 22,624 ounces gold during the same quarter of 2025. Both copper and gold production were down compared to the second quarter of 2025, with copper production down 24% and gold production down 36%.

The decrease in copper production was a result of a 18% decrease in copper grade (0.45% vs. 0.55%) with higher recovery and lower throughput. The decrease in gold production was a result of lower gold grade in the mill feed (0. 35 g/t gold vs. 0.49 g/t gold) and lower throughput, with similar gold recovery (59.4% vs. 60.0%) compared to the same quarter last year.

Both copper and gold production remain on track to achieve the budgeted 2026 production, and the guidance for 2026 Red Chris production (100%) remains 60.0 – 66.0 million pounds of copper and 47,500 – 52,500 ounces of gold.

Imperial’s 30% portion of Red Chris mine for the second quarter of 2026 was 5.377 million pounds copper and 4,377 ounces gold.

Imperial’s 30% share of exploration, development, and capital expenditures were $35.0 million in the June 2026 quarter compared to $30.2 million in the 2025 comparative quarter.

Block Cave Feasibility Study

The Red Chris feasibility study for a block cave expansion operation is advancing. The key permits are in hand with approval from both the Province of British Columbia and Tahltan First Nation. Completion of the feasibility study and, subject to the study outcomes, joint venture approval are expected in the second half of 2026.

Exploration Program

There have been three diamond drills operating at Red Chris during the last quarter, one underground for geotechnical information and two surface drills completing geotechnical information for the proposed block cave and exploration in the Far West zone. Additional surface drilling will be continuing in the Far West zone and then the drill rig will be moving to explore the South Boundary fault offset Main zone target. There will be continued surface exploration outside of the known zones along strike of the Red Chris porphyry stock.

Huckleberry Mine

Huckleberry operations ceased in August 2016 and the mine remains on care and maintenance status.

Following the successful drilling program in 2025 of an underexplored area southwest of the Main Zone Pit, where all nine drillholes intersected copper, molybdenum, silver, and gold mineralization, a program of re-assaying available historic core for gold and silver was completed. A follow-up 2026 drilling program included drilling additional 22 diamond drill holes, with all the holes intersecting significant copper, molybdenum, silver and gold.

The Company has commenced preliminary work on the cost of restarting Huckleberry and is targeting to have a completed reopening plan by the end of 2026 that includes a mine plan optimized with the new diamond drilling data.

For the June 2026 quarter, Huckleberry incurred idle mine costs comprised of $2.6 million in operating costs and compared to $1.7 million in operating cost and $0.3 million in depreciation expense in the comparable quarter of 2025.

Exploration, development, and capital expenditures were $0.9 million in June 2026 quarter compared to $0.1 million in June 2025 quarter.

TECHNICAL INFORMATION

The technical and scientific information related to the Company’s mineral projects has been reviewed and approved by Steve Robertson, P.Geo., Imperial’s Vice President Corporate Development, and a designated Qualified Person as defined by NI 43-101.

EARNINGS AND CASH FLOW

Select Quarter Financial Information

NON-GAAP FINANCIAL MEASURES

The Company reports on four non-GAAP financial measures: adjusted net income, adjusted EBITDA, cash earnings and cash cost per pound of copper produced, which are described in detail below. The Company believes these measures are useful to investors because they are included in the measures that are used by management in assessing the financial performance of the Company.

Adjusted net income, adjusted EBITDA, cash earnings and cash cost per pound of copper are not standardized financial measures under IFRS Accounting Standards and might not be comparable to similar financial measures disclosed by other issuers.

Adjusted Net Income and Adjusted Net Income Per Share

Adjusted net income is derived from operating net income by removing the gains or losses, resulting from acquisition and disposal of property, net of tax, unrealized foreign exchange gains or losses on long term debt, net of tax and other non-recurring items. Adjusted net income in the June 2026 quarter was $22.6 million ($0.13 per share) compared to an adjusted net income of $40.6 million ($0.25 per share) in the 2025 comparative quarter. We believe that the presentation of Adjusted Net Income helps investors better understand the results of our normal operating activities and the ongoing cash generating potential of our business.

Adjusted EBITDA

Adjusted EBITDA in the June 2026 quarter was $70.0 million compared to $99.5 million in the 2025 comparative quarter. We define Adjusted EBITDA as net income before interest expense, taxes, depletion, and depreciation, and as adjusted for certain other items.

Cash Earnings and Cash Earnings Per Share

Cash earnings in the June 2026 quarter was $69.2 million compared to $97.7 million in the 2025 comparative quarter. Cash earnings per share was $0.39 in the June 2026 quarter compared to $0.60 in the 2025 comparative quarter.

Cash earnings and cash earnings per share are measures used by the Company to evaluate its performance; however, they are not terms recognized under IFRS Accounting Standards. We believe that the presentation of cash earnings and cash earnings per share is appropriate to provide additional information to investors about how well the Company can earn cash to pay its debts and manage its operating expenses and investment. Cash earnings is defined as cash flow from operations before the net change in non-cash working capital balances, income and mining taxes paid, and interest paid. Cash earnings per share is the same measure divided by the weighted average number of common shares outstanding during the year.

Cash Cost Per Pound of Copper Produced

Management uses this non-GAAP financial measure to monitor operating costs and profitability. The Company is primarily a copper producer and therefore calculates this non-GAAP financial measure individually for its two operating copper mines, Mount Polley and Red Chris (30% share), and on a composite basis for these mines.

Variations from period to period in the cash cost per pound of copper produced are the result of many factors including: grade, metal recoveries, amount of stripping charged to operations, mine and mill operating conditions, labour and other cost inputs, transportation and warehousing costs, treatment and refining costs, the amount of by-product and other revenues, the US$ to CDN$ exchange rate and the amount of copper produced.

EARNINGS AND CASH FLOW

Select Quarter Financial Information

—

For detailed information, refer to Imperial’s 2026 Second Quarter Management’s Discussion and Analysis available on imperialmetals.com and sedarplus.ca.

About Imperial

Imperial is a Vancouver based exploration, mine development and operating company with holdings that include the Mount Polley mine (100%), the Huckleberry mine (100%), and the Red Chris mine (30%). Imperial also holds a portfolio of 23 greenfield exploration properties in British Columbia.

Company Contacts

Brian Kynoch | President | 604.669.8959
Darb S. Dhillon | Chief Financial Officer **|**604.669.8959
Steve Robertson | Vice President Corporate Development | 604.669.8959

Cautionary Note Regarding Forward-Looking Statements

Certain information contained in this news release are not statements of historical fact and are “forward-looking” statements. Forward-looking statements relate to future events or future performance and reflect Company management’s expectations or beliefs regarding future events and include, but are not limited to, specific statements regarding the Company’s expectations with respect to: the extension of permitted mine life for both the Mount Polley and Red Chris mines as a result of receiving amendments to key authorizations, the receipt of which positions the Company to deliver returns in the coming years; the expected delivery of higher grade material from Phase 5 to Mount Polley’s mill in the fourth quarter of 2026 which should reduce or eliminate the need to process lower grade stockpiles; the expectation that the Mount Polley mine will meet the range of guidance for 2026 production; the expected completion of the Red Chris feasibility study and, subject to the study outcomes, joint venture approval by the second half of 2026; planned additional surface drilling at the Red Chris mine in the Far West zone and the South Boundary fault offset Main zone target, in addition to surface exploration outside of the known zones along strike of the Red Chris porphyry stock; ongoing updates to optimize plans for reopening the Huckleberry mine, including data from the diamond drilling and re-assaying of historic core to develop a new block model for the Main zone, with a targeted completion date for the reopening plan by the end of 2026; and more general statements regarding the Company’s expectations with respect to its business and operations; metal pricing and demand; fluctuation of revenues; metal production guidance and estimates; and expectations regarding the usefulness of non-IFRS financial measures including adjusted net income (loss), adjusted EBITDA, cash earnings and cash cost per pound of copper.

In certain cases, forward-looking statements can be identified by the use of words such as “plans”, “expects” or “does not expect”, “is expected”, “outlook”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.

In making the forward-looking statements in this news release, the Company has applied certain factors and assumptions that are based on information currently available to the Company as well as the Company’s current beliefs and assumptions. These factors and assumptions and beliefs and assumptions include hazards and risks disclosed with the “Risk Factors” section of the Company’s current Annual Information Form, and other public filings which are available for review on Imperial’s SEDAR+ profile at sedarplus.ca. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended, many of which are beyond the Company’s ability to control or predict. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and all forward-looking statements in this news release are qualified by these cautionary statements.

Subscribe for Email Updates:

First Name *

Last Name *

Your Email *

Submit

Imperial Metals Corporation

© 2026 Imperial Metals Corporation. All rights reserved.

Contact | Legal Notice | Privacy Statement

Website by Proactive Digital Solutions

GDPR Cookie Banner

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in settings.

Accept

Change cookie settings

Close GDPR Cookie Settings

Favicon

  • Privacy Overview
  • Necessary
  • Analytics
  • Cookie Policy

Powered by  GDPR Cookie Compliance (opens in a new tab)

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Necessary

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Enabled Disabled

Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.

Enabled Disabled

Cookie Policy

More information about our Cookie Policy

Enable All Save Settings

Prompts

Imperial Metals Corporation (ticker III), listed in Canada.

ETFs Holding Imperial Metals Corporation

ETF Weight in ETF Shares Market value As of
AVDV 0.02% 855,369 $ 3.23M Nov 16, 2026
DISV 0.01% 140,619 $ 587.638K Nov 12, 2026
AVDS 0.01% 8,868 $ 33.486K Nov 16, 2026
DXIV 0.01% 4,937 $ 20.631K Nov 12, 2026
DFIS 0.00% 16,857 $ 70.444K Nov 12, 2026
DFIC 0.00% 40,860 $ 170.751K Nov 12, 2026
DFAI 0.00% 15,214 $ 63.578K Nov 12, 2026
DFAX 0.00% 6,840 $ 28.584K Nov 12, 2026
AVDE 0.00% 123,546 $ 466.521K Nov 16, 2026