G Mining Ventures Corp. is a gold mining company engaged in the acquisition, exploration, development, and operation of mineral properties in Brazil and Guyana. The company's primary business focus is the operation of the Tocantinzinho Gold Mine in northern Brazil, where it has reached commercial production. It is also developing the Oko West gold project in Guyana and the Gurupi Project in Brazil. G Mining Ventures holds these assets through wholly owned subsidiaries, including Brazauro Recursos Minerais Ltda. and GMIN Ventures Guyana Inc. The company was formed in 2024 through a business combination of G Mining TZ Corp. and G Mining Guyana Corp., which was formerly known as Reunion Gold Corporation. It maintains a Master Services and Cooperation Agreement with G Mining Services Inc. to access technical expertise for project evaluation, construction, and operation. The company trades on the Toronto Stock Exchange and the OTCQX.

Summarised from the company's own disclosures, fiscal year ended Dec 2025

Industry Gold Homepage gmin.gold
Sector Basic Materials IR page investors.gmin.gold/English/overview/default.aspx
Tags
gold mining, mineral exploration, mine development, commercial production, underground mining, open pit mining, precious metals, Tocantinzinho Gold Mine, Oko West Project, Gurupi Project, Brazauro Recursos Minerais Ltda., GMIN Ventures Guyana Inc., G Mining Services Inc., G Mining TZ Corp., G Mining Guyana Corp., Reunion Gold Corporation, G2 Goldfields Inc.
Press page investors.gmin.gold/English/news/default.aspx

Metrics

Valuation  
Market cap C$ 11.213B
Market cap (USD) $ 7.865B
P/E —
PEG —
P/BV —
P/S —
P/OCF —
P/FCF —
Dividend yield —
Turnover / mcap —
Returns  
ROE —
ROI —
ROIC —
Profit margin 49.6%
Growth  
Revenue growing No
Profits growing No
Revenue up 3y —
Revenue up 5y —
Earnings growth 3y (net profit CAGR) —
Quality  
Profitable Yes
Margin expanding Yes
Buying back stock —
Diluting (TTM) —
Debt/Equity —
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 0
Quality score —
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021 FY 2020 FY 2019 FY 2018
Revenue 580.665K 145.251M 0 — — — — —
Net profit 287.863K 62.005M -7.18M -1.897M — -2.469M -374.576K -62.841K

Operating KPIs — quarters

KPI Dec 24 Mar 25 Jun 25 Sep 25 Dec 25 Mar 26 Jun 26 Sep 26
Gold production (oz) 40,147 35,578 42,587 46,360 47,346 31,846 36,845 44,960
↳ YoY growth +17.9% -10.5% -13.5% -3.0%
All-in sustaining cost (USD) — — — 51,383 — — — 68,603
↳ YoY growth +33.5%
Reported Mar 25, 2026 May 13, 2026 Aug 12, 2026 — Jan 13, 2026 May 13, 2026 Aug 12, 2026 —

Operating KPIs — years

KPI Dec 2024 Dec 2025
Gold production (oz) 63,566 171,871
↳ YoY growth +170.4%
Reported Mar 25, 2026 Jan 13, 2026

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

October 8, 2026

BROSSARD, Quebec, Oct. 08, 2026 (GLOBE NEWSWIRE) -- G Mining Ventures Corp. (“GMIN” or the “Corporation”) (TSX: GMIN, OTCQX: GMINF) is pleased to report preliminary production results for the quarter ended September 30, 2026 from its 100%-owned Tocantinzinho Gold Mine (“TZ”) in Pará State, Brazil.

TZ produced 44,960 ounces (“oz”) of gold (“Au”) in the third quarter of 2026, a 22% increase over Q2 2026. On a year-to-date basis, the Corporation has produced and sold 113,651 oz Au and 114,325 oz Au, respectively, putting the Corporation on track to achieve the midpoint of full-year production guidance of 160,000 to 190,000 oz Au.

Preliminary Third Quarter 2026 Operational Results Highlights:

  • Gold produced: 44,960 oz

  • Gold sold: 43,110 oz

  • Average plant throughput: 12,372 tpd

  • Average grade processed: 1.33 g/t Au

  • Gold recovery: 92.0%

  • Strip ratio: 2.47x

"Our third quarter operational results were solid and delivered the step-up in production we expected to support a strong second half of the year, with higher grades and improved gold recoveries driving production of 44,960 ounces for the quarter,” commented Louis-Pierre Gignac, President and Chief Executive Officer of GMIN**.** “TZ continues to perform very well, with mining rates averaging 74,209 tpd during the quarter, a 7% increase over Q2 2026. Throughput rates at the processing plant averaged 12,372 tpd with gold grades of 1.33 grams per tonne and gold recoveries of 92.0%, representing the strongest quarterly results year-to-date.”

“Mining activities remain closely aligned with the mine plan, enabling access to higher-grade Phase 2 mineralization and positioning the operation for a significant increase in grade and production in Q4,” continued Mr. Gignac_. “Building on the strong operational performance delivered this quarter and together with the continued advancement of our exploration programs, we expect to deliver a strong finish to 2026 and carry that momentum into 2027."_

Table 1. TZ Preliminary Third Quarter 2026 Operational Results

| | | | | | | | |

| --- | --- | --- | --- | --- | --- | --- | --- |

| | | Q3 20261 | | Q3 2025 | | YTD 2026 | |

| | | | | | | | |

| Mining Activities | | | | | | | |

| Ore Tonnes Mined | kt | 1,966 | | 1,787 | | 4,659 | |

| Waste Tonnes Mined | kt | 4,861 | | 3,275 | | 14,005 | |

| Total Tonnes Mined | kt | 6,827 | | 5,062 | | 18,664 | |

| Strip Ratio | Waste/Ore | 2.47 | | 1.83 | | 3.01 | |

| Processing Activities | | | | | | | |

| Total Tonnes Processed | kt | 1,138 | | 1,094 | | 3,213 | |

| Avg. Plant Throughput | tpd | 12,372 | | 11,890 | | 11,770 | |

| Avg. Gold Recovery | % | 92.0 | % | 92.3 | % | 91.5 | % |

| Avg. Gold Grade Processed | g/t Au | 1.33 | | 1.43 | | 1.20 | |

| Gold Produced | oz | 44,960 | | 46,360 | | 113,651 | |

| Gold Sold | oz | 43,110 | | 49,119 | | 114,325 | |

1_._ Q3 2026 operating results are preliminary and subject to final reconciliation. Comparative Q3 2025 operating data are derived from the Corporation’s previously reported results.

Third Quarter 2026 Conference Call Details

The Corporation expects to release its third quarter 2026 financial and operating results after market close on Thursday, November 12, 2026. Senior management will host a conference call and webcast on Friday, November 13, 2026, at 9:00 a.m. (ET) to discuss the results. Participants may join using the following details:

The conference call will also be accessible through the GMIN investor relations website at: https://investors.gmin.gold/English/events-and-presentations/default.aspx

About G Mining Ventures Corp.

G Mining Ventures Corp. is a mining company engaged in the development, operation and exploration of precious metals projects. GMIN is well-positioned to grow into the next mid-tier precious metals producer by leveraging strong access to capital and proven development expertise. GMIN is currently anchored by the Tocantinzinho Mine in Brazil, supported by the Gurupi Project in Brazil and the Oko Gold Project in Guyana — all with significant exploration upside and located in mining-friendly jurisdictions. GMIN trades on the TSX under the symbol “GMIN” and its shares are quoted on the OTCQX network under the symbol “GMINF”.

Additional Information

For further information on GMIN, please visit the website at www.gmin.gold

or contact:

Jean-François Lemonde 

Vice President, Investor Relations 

514.299.4926

Cautionary Statement on Forward-Looking Information 

All statements, other than statements of historical fact, contained in this press release constitute “forward-looking information” and “forward-looking statements” within the meaning of certain securities laws and are based on expectations and projections as of the date of this press release. Forward-looking statements contained in this press release include, without limitation, those related to (i) the Corporation remaining on track to achieve the midpoint of full-year production guidance; (ii) the anticipated access to higher-grade Phase 2 mineralization; (iii) production of Q4-2026 expected to lead to a strong finish to 2026; and (iv) the quoted comments of GMIN’s Chief Executive Officer, as well as the whole contents of the section entitled “About G Mining Ventures Corp.”.

Forward-looking statements are based on expectations, estimates and projections as of the time of this press release. Forward-looking statements are necessarily based upon several estimates and assumptions that, while considered reasonable by the Corporation as of the time of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. These estimates and assumptions may prove to be incorrect. Such assumptions include, without limitation, those relating to GMIN continuing to improve operational results and generate free cash flow as well as profitability, those relating to the price of gold and currency exchange rates, those outlined in feasibility and other technical studies relating to GMIN’s mining assets, and those underlying the items listed on the above section entitled “About G Mining Ventures Corp.”.

Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, actual results to differ materially from those expressed or implied in any forward-looking statements. There can be no assurance that, notably but without limitation, (i) TZ will continue operating and delivering production, recoveries and costs that will remain in line with expectations; (ii) GMIN will achieve the midpoint of full-year production guidance; (iii) a meaningful increase in grade and production will take place in Q4-2026; (iv) mining activities will remain closely aligned with the mine plan; (v) the higher-grade Phase 2 mineralization will be accessed in Q4-2026, or at all; (vi) Oko West will be brought into commercial production in 2028, or at all; or (vii) GMIN will use TZ and Oko West to grow into the next mid-tier precious metals producer, as future events could differ materially from what is currently anticipated by the Corporation. In addition, there can be no assurance that Brazil and/or Guyana will remain mining friendly and prospective jurisdictions.

By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions do not reflect future experience. Forward-looking statements are provided for the purpose of providing information about management’s expectations and plans relating to the future. Readers are cautioned not to place undue reliance on these forward-looking statements as several important risk factors and future events could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates, assumptions and intentions expressed in such forward-looking statements. All of the forward-looking statements made in this press release are qualified by these cautionary statements and those made in the Corporation’s other filings with the securities regulators of Canada including, but not limited to, the cautionary statements made in the relevant sections of the Corporation’s (i) Annual Information Form dated March 25, 2026, for the financial year ended December 31, 2025, and (iii) Management Discussion & Analysis. The Corporation cautions that the foregoing list of factors that may affect future results is not exhaustive, and new, unforeseeable risks may arise from time to time. The Corporation disclaims any intention or obligation to update or revise any forward-looking statements or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law.

Source: G Mining Ventures Corp.

September 16, 2026

BROSSARD, Quebec, Sept. 16, 2026 (GLOBE NEWSWIRE) -- G Mining Ventures Corp. (“GMIN” or the “Corporation”) (TSX:GMIN | OTCQX:GMINF) today provides an update on its exploration drilling activities completed at its wholly owned Gurupi Project (“Gurupi” or the “Project”) in Maranhão state, Brazil and Tocantinzinho mine (“TZ”) in Pará State, Brazil. At Gurupi, drilling continues to demonstrate extensions to known mineralization at the Blanket (“Blanket”) and Mandiocal (“Mandiocal”) deposits and while maiden drilling at the Grodiocal target (“Grodiocal”) has confirmed a new near-surface gold discovery. At TZ, drilling below the current pit design confirms the continuity of mineralization at depth, while regional exploration is identifying additional opportunities across a broader mineralized corridor.

Intercepts are indicated in metres (“m”) and grade in grams per tonne of gold (“g/t Au”).

New highlights include:

Gurupi 

  • Blanket: Broad intercepts extend mineralization approximately 250 metres beyond the 2025 Mineral Resource Estimate (“MRE”), with results including 79.6 m at 1.78 g/t Au and 63.5 m at 1.28 g/t Au

  • Mandiocal: Mineralization extended up to 125 m below the 2025 MRE pit shell, including 48.4 m at 1.32 g/t Au and 35.0 m at 1.37 g/t Au

  • Grodiocal: Maiden drilling confirmed a new, near-surface gold discovery, highlighted by 23.0 m at 1.97 g/t Au, including 9.0 m at 4.24 g/t Au and 10.0 m at 3.42 g/t Au

  • An updated MRE is expected to be complete before year-end, which will form the basis of a Preliminary Economic Assessment (“PEA”) targeted to be completed by the end of 2026

TZ

  • Drilling up to 150 metres below the current pit design confirms continuity of mineralization at depth

  • Results include 78.1 m at 1.81 g/t Au, including 16.0 m at 4.34 g/t Au and 51.0 m at 1.31 g/t Au, including 7.80 m at 6.42 g/t Au

  • Regional exploration has defined a 15 km by 3 km mineralized corridor hosting the Tocantinzinho deposit and multiple satellite targets.

Julie-Anaïs Debreil, Vice-President Geology & Resources, commented: “The results from our 2026 exploration programs continue to validate the significant potential we see across both Gurupi and Tocantinzinho. At Gurupi, drilling has successfully extended mineralization at Blanket and Mandiocal while confirming a new gold discovery at Grodiocal, further demonstrating the district-scale potential of the Project. At TZ, drilling below the current pit design continues to confirm the continuity of mineralization at depth, while regional exploration is identifying additional opportunities across a broader mineralized corridor. As we advance an updated MRE and PEA at Gurupi, these programs continue to strengthen our pipeline of organic growth opportunities in Brazil.”

Gurupi Demonstrates District-Scale Growth Potential

Gurupi hosts approximately 43.5 million tonnes (“Mt”) grading 1.31 g/t Au, which contain 1.8 million ounces (“Moz”) of Indicated Resources and 18.5 Mt grading 1.29 g/t Au containing 0.8 Moz of Inferred Resources as estimated in the 2025 MRE, distributed across the Blanket, Contact, Chega Tudo and Mandiocal deposits (Figure 1). Since exploration drilling resumed in November 2025, the Corporation has completed 32,610 m in 186 holes across Blanket, Mandiocal and Grodiocal. The program is testing extensions to existing mineralized systems and evaluating the newly discovered Grodiocal target along the prospective Chega Tudo-Mandiocal corridor.

Figure 1 - Gurupi Deposits

Blanket Drilling Intersects Mineralization Beyond Current Resource Limits

At Blanket, drilling continues to test the potential for further extensions of mineralization beyond the current MRE. Nineteen diamond drill holes for 6,323 m have been completed with assay results received for seven holes and results pending for 12 holes (Table 1). Recent drilling has intersected mineralization approximately 250 m beyond the current MRE, supporting the interpretation of down-plunge continuity and indicating that the deposit remains open for follow-up drilling (Figures 2a, 2b and 2c). Structural analysis indicates that multiple folding events have enhanced both the thickness and grade distribution of mineralization, creating broad zones that remain only partially tested. Results from the ongoing program support continued evaluation of the deposit along plunge and at depth.

Table 1: Significant Blanket Drilling Highlights

| | | | | | | |

| --- | --- | --- | --- | --- | --- | --- |

| Hole ID | | From (m) | To (m) | Au (g/t Au) | Length* (m) | Composite |

| GUD-26-019 | | 202.0 | 234.0 | 0.67 | 32.0 | 32.0 m at 0.67 g/t Au |

| GUD-26-021 | | 254.0 | 284.0 | 1.38 | 30.0 | 30.0 m at 1.38 g/t Au |

| | Incl. | 254.0 | 263.1 | 2.21 | 9.1 | 9.1 m at 2.21 g/t Au |

| | And | 265.0 | 269.0 | 2.64 | 4.0 | 4.0 m at 2.64 g/t Au |

| GUD-26-023 | | 170.0 | 233.5 | 1.28 | 63.5 | 63.5 m at 1.28 g/t Au |

| | Incl. | 197.0 | 210.5 | 3.21 | 13.5 | 13.5 m at 3.21 g/t Au |

| GUD-26-026 | | 240.0 | 272.5 | 2.28 | 32.5 | 32.5 m at 2.28 g/t Au |

| | Incl. | 240.0 | 247.0 | 6.78 | 7.0 | 7.0 m at 6.78 g/t Au |

| GUD-26-029 | | 145.5 | 225.1 | 1.78 | 79.6 | 79.6 m at 1.78 g/t Au |

| | Incl. | 215.3 | 225.1 | 3.49 | 9.8 | 9.8 m at 3.49 g/t Au |

| | And | 180.7 | 185.7 | 3.17 | 5.0 | 5.0 m at 3.17 g/t Au |

*True width estimated at 95% of the length

Figure 2a - Section through Blanket Deposit

Figure 2b - Section through Blanket Deposit

Figure 2c - Section through Blanket Deposit

Mandiocal Drilling Confirms Down-Plunge Continuity

At Mandiocal, gold mineralization is hosted within a dacitic volcanic unit. Twenty-four diamond drill holes for 6,787 m have been completed, with assay results received for 13 holes and results pending for 11 holes (Table 2). The objective was to evaluate the lateral and depth extensions of the deposit. Drilling has intersected mineralization up to 125 m below the 2025 MRE pit shell while demonstrating increased thickness of the mineralized system at depth (Figure 3). These results support the interpretation of southeast down-plunge continuity and indicate that mineralization remains open beyond the limits of the current resource model.

Table 2: Significant Mandiocal Drilling Highlights

| | | | | | | |

| --- | --- | --- | --- | --- | --- | --- |

| Hole ID | | From (m) | To (m) | Au (g/t Au) | Length* (m) | Composite |

| GUD-26-027 | | 222.5 | 257.5 | 1.37 | 35.0 | 35.0 m at 1.37 g/t Au |

| | Incl. | 239.5 | 245.5 | 3.60 | 6.0 | 6.0 m at 3.60 g/t Au |

| GUD-26-028 | | 276.5 | 324.9 | 1.32 | 48.4 | 48.4 m at 1.32 g/t Au |

| | Incl. | 293.0 | 302.8 | 2.83 | 9.8 | 9.8 m at 2.83 g/t Au |

| | Incl. | 308.8 | 313.8 | 3.55 | 5.0 | 5.0 m at 3.55 g/t Au |

| GUD-26-030 | | 251.5 | 284.0 | 0.82 | 32.5 | 32.5 m at 0.82 g/t Au |

| | Incl. | 261.5 | 270.5 | 1.24 | 9.0 | 9.0 m at 1.24 g/t Au |

| GUD-26-031 | | 216.5 | 251.0 | 0.77 | 34.5 | 34.5 m at 0.77 g/t Au |

| GUD-26-033 | | 183.0 | 228.0 | 0.55 | 45.0 | 45.0 m at 0.55 g/t Au |

| GUD-26-034 | | 170.2 | 197.0 | 0.72 | 26.8 | 26.8 m at 0.72 g/t Au |

| GUD-26-035 | | 210.8 | 234.3 | 0.64 | 23.5 | 23.5 m at 0.64 g/t Au |

*True width estimated at 85% of the length

Figure 3 - Section of Mandiocal deposit

Maiden Drilling Confirms the Grodiocal Gold Discovery

Grodiocal is a newly identified discovery located northwest of Mandiocal along the prospective Chega Tudo trend, where no historical drilling had previously been completed. The maiden program comprised 17,667 m in 127 holes, including 22 diamond drill holes and 105 Reverse Circulation holes, and identified multiple zones of near-surface gold mineralization within a corridor extending approximately 5 km in strike length and up to 1 km in width (Table 3). Mineralization is hosted within deformed sedimentary rocks of the Chega Tudo Formation. The results establish Grodiocal as a priority target for follow-up drilling to better define the geometry, continuity, and extent of the mineralized zones (Figure 4).

Table 3: Significant Grodiocal Drilling Highlights

| | | | | | | |

| --- | --- | --- | --- | --- | --- | --- |

| Hole ID | | From (m) | To (m) | Au (g/t Au) | Length* (m) | Composite |

| GUD-26-007 | | 19.6 | 33.0 | 1.02 | 13.4 | 13.4 m at 1.02 g/t Au |

| | | 55.5 | 63.0 | 3.48 | 7.5 | 7.5 m at 3.48 g/t Au |

| GUD-26-010 | | 139.5 | 147.3 | 1.59 | 7.8 | 7.8 m at 1.59 g/t Au |

| GUD-26-017 | | 97.5 | 109.5 | 1.09 | 12.0 | 12.0 m at 1.09 g/t Au |

| GUD-26-022 | | 92.0 | 95.0 | 4.31 | 3.0 | 3.0 m at 4.31 g/t Au |

| GUR-26-018 | | 74.0 | 81.0 | 2.54 | 7.0 | 7.0 m at 2.54 g/t Au |

| GUR-26-024 | | 40.0 | 47.0 | 1.62 | 7.0 | 7.0 m at 1.62 g/t Au |

| GUR-26-039 | | 63.0 | 75.0 | 1.26 | 12.0 | 12.0 m at 1.26 g/t Au |

| | Incl. | 65.0 | 68.0 | 3.85 | 3.0 | 3.0 m at 3.85 g/t Au |

| GUR-26-057 | | 61.0 | 70.0 | 1.40 | 9.0 | 9.0 m at 1.40 g/t Au |

| | Incl. | 61.0 | 64.0 | 3.54 | 3.0 | 3.0 m at 3.54 g/t Au |

| GUR-26-059 | | 2.0 | 26.0 | 0.60 | 24.0 | 24.0 m at 0.60 g/t Au |

| GUR-26-066 | | 23.0 | 33.0 | 3.42 | 10.0 | 10.0 m at 3.42 g/t Au |

| GUR-26-068 | | 51.0 | 74.0 | 1.97 | 23.0 | 23.0 m at 1.97 g/t Au |

| | Incl. | 55.0 | 64.0 | 4.24 | 9.0 | 9.0 m at 4.24 g/t Au |

| GUR-26-072 | | 84.0 | 100.0 | 1.51 | 16.0 | 16.0 m at 1.51 g/t Au |

| | Incl. | 91.0 | 95.0 | 3.76 | 4.0 | 4.0 m at 3.76 g/t Au |

| GUR-26-073 | | 80.0 | 85.0 | 2.02 | 5.0 | 5.0 m at 2.02 g/t Au |

| GUR-26-076 | | 17.0 | 29.0 | 0.87 | 12.0 | 12.0 m at 0.87 g/t Au |

*True width estimated at 85% of the length

Figure 4 - New Grodiocal Discovery

Results from the Gurupi exploration program will be evaluated for inclusion in an updated MRE. The Corporation is also advancing a PEA targeted for year-end 2026, which is expected to evaluate potential development scenarios for the Project.

TZ Continues to Deliver Near-Mine and District-Scale Opportunities

While Gurupi represents an important future growth platform, TZ remains the foundation of GMIN’s Brazilian operations and a key source of near-mine organic growth. Exploration at the operation is focused on testing mineralization below the current pit design and advancing a growing pipeline of regional targets across the broader district. Together, these programs are intended to support future resource evaluation and mine-planning opportunities around GMIN’s cornerstone producing asset in Brazil.

TZ Drilling Confirms Mineralization Below the Current Pit

Recent drilling completed up to 150 m beneath the current pit design continues to demonstrate the continuity of mineralization at depth and provides potential for mineral resource conversion or additions, subject to additional drilling, geological modelling and economic evaluation (Figure 5). Recent drilling from four holes (2,548 m) returned broad mineralized intervals supporting the extension of the mineralized system below currently defined mining limits (Table 4).

Table 4: Significant TZ Drilling Highlights

| | | | | | | |

| --- | --- | --- | --- | --- | --- | --- |

| Hole ID | | From (m) | To (m) | Au (g/t Au) | Length (m) | Composite |

| BRZ-25-121 | | 369.4 | 447.5 | 1.81 | 78.1 | 78.1 m at 1.81 g/t Au |

| | Incl. | 427.0 | 443.0 | 4.34 | 16.0 | 16.0 m at 4.34 g/t Au |

| | And | 461.5 | 466.3 | 1.48 | 4.8 | 4.8 m at 1.48 g/t Au |

| | | 491.0 | 506.0 | 1.11 | 15.0 | 15.0 m at 1.11 g/t Au |

| BRZ-26-129 | | 502.5 | 513.0 | 4.62 | 10.5 | 10.5 m at 4.62 g/t Au |

| | | 611.0 | 630.0 | 1.52 | 19.0 | 19.0 m at 1.52 g/t Au |

| | Incl. | 612.0 | 616.0 | 4.97 | 4.0 | 4.0 m at 4.97 g/t Au |

| BRZ-26-132 | | 563.0 | 569.0 | 1.30 | 6.0 | 6.0 m at 1.30 g/t Au |

| BRZ-26-134 | | 371.0 | 422.0 | 1.31 | 51.0 | 51.0 m at 1.31 g/t Au |

| | Incl. | 382.0 | 389.8 | 6.42 | 7.8 | 7.8 m at 6.42 g/t Au |

| | | 430.0 | 457.0 | 1.08 | 27.0 | 27.0 m at 1.08 g/t Au |

| | Incl. | 440.0 | 446.0 | 3.03 | 6.0 | 6.0 m at 3.03 g/t Au |

| | | 550.0 | 554.0 | 1.87 | 4.0 | 4.0 m at 1.87 g/t Au |

*True width estimated at 85% of the length

These results improve the geological understanding of the mineralized system below the current pit design and identify areas for continued drilling and evaluation in future resource and mine-planning studies.

Figure 5 – Long section of the TZ deposit

Regional Program Advances TZ Exploration Pipeline

Beyond the existing deposit, regional exploration has established a new district-scale exploration framework centered on a 15-km by 3-km mineralized transtensional corridor that hosts the TZ deposit and numerous satellite targets. Exploration is increasingly focused on structural intersections between the main NW-SE (TZ trend) and E-W structures, which are interpreted to be key controls on mineralization. This work has identified multiple priority targets, providing a growing pipeline of near-mine and regional growth opportunities.

Exploration along newly defined trends has delineated several mineralized zones over a strike length exceeding 3 km and has returned rock sample assays of up to 29.8 g/t Au, reinforcing the potential for the discovery of additional mineralization within the broader TZ district.

Next Steps

Exploration activities across Gurupi and TZ continue to advance according to plan. Follow-up drilling is underway at Blanket, Mandiocal and Grodiocal while an updated Gurupi MRE and PEA remain targeted for year-end 2026. At TZ, drilling continues below the current pit design and across regional targets within the recently defined mineralized corridor.

Year-to-date, the Corporation has completed approximately 33,600 m of the accelerated 65,000 m program at Gurupi, 14,500 m of the 25,000 m program at TZ. Exploration results from approximately 31,000 m drilled at GMIN's wholly owned Oko Project, Guyana, will be reported in a separate news release at a later date.

Sampling and Quality Assurance/Quality Control ("QA/QC") Disclosure

Gurupi assay samples are prepared at ALS Chemex in Parauapebas, Brazil, and Tocantinzinho assay samples are prepared at ALS Chemex in Cuiaba, Brazil. Samples from both projects are analyzed at an accredited laboratory in Lima, Peru, using fire assay and Inductively Coupled Plasma methods. Standard preparation includes crushing to 70% passing 2 mm and pulverizing 250 g to 85% passing 75 μm. Gold assays are performed using a 30 g fire assay with atomic absorption finish, with samples returning >10 g/t Au re-assayed by fire assay with gravimetric finish. When visible gold is present, a 1 kg split is pulverized to 95% passing 106 μm and subjected to screen fire assay for coarse gold evaluation. Duplicate analyses are also completed for added quality control. For a complete description of Gurupi's sample preparation, analytical methods and QA/QC procedures, refer to the technical report for the Gurupi Project dated April 8, 2025 (effective date February 3, 2025), entitled “Mineral Resource Estimate NI 43-101 Technical Report Gurupi Project”. For TZ, refer to the technical report dated April 8, 2025 (effective date February 3, 2025), entitled “Feasibility Study – NI 43-101 Technical Report, Tocantinzinho Gold Project”.

The Corporation maintains a rigorous QA/QC program, including the routine insertion of certified standards, blanks, and field duplicates (approximately 10% of all samples). QA/QC results are closely monitored, and any failures are re-assayed to ensure the reliability of reported results.

Qualified Person

The technical content of this press release has been reviewed and approved by Julie-Anaïs Debreil, Vice President Geology & Resources of GMIN, who is a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects.

August 28, 2026

BROSSARD, Quebec, Aug. 28, 2026 (GLOBE NEWSWIRE) -- G Mining Ventures Corp. (“GMIN” or the “Corporation”) (TSX: GMIN, OTCQX: GMINF) is pleased to announce that the Toronto Stock Exchange (the “TSX”) has accepted the Corporation’s Notice of Intention to make a normal course issuer bid (“NCIB”) to purchase, for cancellation, up to an aggregate of 7,537,688 common shares of GMIN (“Common Shares”), representing approximately 2.54% of the Corporation’s issued and outstanding Common Shares, being 296,306,236 Common Shares as of August 25, 2026. Purchases can me made at prevailing market prices during a 12-month period commencing on September 1st, 2026, and ending on the earlier of August 31, 2027, or the date on which the Corporation reaches the maximum purchases permitted under the NCIB.

GMIN believes that the establishment of the NCIB provides the Corporation with the flexibility to acquire Common Shares from time to time as an effective means of returning capital to shareholders in accordance with its corporate strategy.

Purchases under the NCIB will be made on the open market through the facilities of the TSX, other designated exchanges and/or alternative Canadian trading systems or by such other means as may be permitted by the applicable securities regulator, at the market price of the Common Shares at the time of the acquisition. The number of Common Shares that can be purchased pursuant to the NCIB is subject to a daily maximum of 188,191 Common Shares (*which is equal to 25% of the average daily trading volume of 752,765 Common Shares on the TSX for the full six calendar months ending July 31, 2026), subject to the Corporation’s ability to make one block purchase of Common Shares per calendar week that exceeds such limits. All Common Shares purchased under the NCIB will be cancelled after purchase. The Corporation intends to fund any purchases under the NCIB from its available working capital.

Outside of blackout periods, Common Shares may be purchased under the NCIB based on the discretion of GMIN’s management, in compliance with the rules of the TSX and applicable securities laws.

Although GMIN has the present intention to acquire its Common Shares pursuant to the NCIB, GMIN will not be obligated to make any purchases and purchases may be suspended by GMIN at any time. Decisions regarding any future purchases will depend on certain factors, such as market conditions, share price and other opportunities to invest capital for growth. GMIN has not purchased any Common Shares under a NCIB within the past 12 months.

About G Mining Ventures Corp.

G Mining Ventures Corp. is a mining company engaged in the acquisition, exploration and development of precious metal projects to capitalize on the value uplift from successful mine development. GMIN is well-positioned to grow into the next mid-tier precious metals producer by leveraging strong access to capital and proven development expertise. GMIN is currently anchored by the Tocantinzinho Mine in Brazil, supported by the Gurupi Project in Brazil and the Oko Gold Project in Guyana — all with significant exploration upside and located in mining-friendly jurisdictions. GMIN trades on the TSX under the symbol “GMIN” and on the OCTQX under the symbol “GMINF”.

Additional Information

For further information on GMIN, please visit the website at www.gmin.gold

or contact:

Jean-François Lemonde 

Vice President, Investor Relations 

514.299.4926

[email protected]

Cautionary Statement on Forward-Looking Information

All statements, other than statements of historical fact, contained in this press release constitute “forward-looking information” and “forward-looking statements” within the meaning of certain securities laws and are based on expectations and projections as of the date of this press release. Forward-looking statements contained in this press release include, without limitation, those related to the Corporation’s intentions regarding the NCIB, including to purchase Common Shares for cancellation and to fund purchases from available working capital, as well as the whole contents of the section entitled “About G Mining Ventures Corp.”.

Forward-looking statements are based on expectations, estimates and projections as of the time of this press release. Forward-looking statements are necessarily based upon several estimates and assumptions that, while considered reasonable by the Corporation as of the time of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. These estimates and assumptions may prove to be incorrect. Such assumptions include, without limitation, those relating to the Corporation’s financial position and available working capital, prevailing market conditions and share price, the Corporation’s ability to execute on its corporate strategy, and those underlying the items listed in the section entitled “About G Mining Ventures Corp.”.

Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, actual results to differ materially from those expressed or implied in any forward-looking statements. There can be no assurance that the Corporation will purchase any Common Shares pursuant to the NCIB, or that the Corporation will have sufficient working capital to fund purchases, as future events could differ materially from what is currently anticipated by the Corporation. In addition, there can be no assurance that Brazil and/or Guyana will remain mining friendly and prospective jurisdictions. 

By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions do not reflect future experience. Forward-looking statements are provided for the purpose of providing information about management’s expectations and plans relating to the future. Readers are cautioned not to place undue reliance on these forward-looking statements as several important risk factors and future events could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates, assumptions and intentions expressed in such forward-looking statements. All of the forward-looking statements made in this press release are qualified by these cautionary statements and those made in the Corporation’s other filings with the securities regulators of Canada including, but not limited to, the cautionary statements made in the relevant sections of the Corporation’s (i) Annual Information Form dated March 25, 2026, for the financial year ended December 31, 2025, and (ii) Management Discussion & Analysis for the three and six months ended June 30, 2026. The Corporation cautions that the foregoing list of factors that may affect future results is not exhaustive, and new, unforeseeable risks may arise from time to time. The Corporation disclaims any intention or obligation to update or revise any forward-looking statements or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law.

Prompts

G Mining Ventures Corp. (ticker GMIN), listed in Canada.

Company History

Date Change Detail
Dec 31, 2021 Reporting currency Its CA reports are in USD instead of CAD from this period. Earlier figures are shown in USD, converted at each period end's exchange rate.

ETFs Holding G Mining Ventures Corp.

ETF Weight in ETF Shares Market value As of
GDMN 0.64% 37,676 $ 1.419M Aug 31, 2026
AVDS 0.07% 8,353 $ 260.569K Nov 16, 2026
AVDE 0.01% 68,781 $ 2.146M Nov 16, 2026