Aecon Group Inc. is a construction and infrastructure development company operating in the Construction and Concessions segments. The firm provides services to private and public sector clients throughout Canada, the United States, and on a selected basis internationally. Its business includes heavy civil contracting, buildings, and public-private partnerships (P3s). Notable projects include the Gordie Howe International Bridge, the Réseau express métropolitain (REM) in Montreal, the Eglinton Crosstown LRT, the Darlington Nuclear Refurbishment, the Coastal GasLink Pipeline, and the Site C Generating Station. The company also works in the mining sector and energy storage, such as the Oneida Energy Storage facility. Aecon’s heritage traces back to 1867, with the legal entity established in 1957. The company was formerly known as Armbro Enterprises Inc. and changed its name to Aecon in 2001.

Summarised from the company's own disclosures, fiscal year ended Dec 2025

Industry Engineering & Construction Homepage aecon.com
Sector Industrials IR page aecon.com/investing
Tags
heavy civil construction, public-private partnerships, infrastructure development, nuclear refurbishment, pipeline construction, hydroelectric dams, light rail transit, energy storage, mining construction, bridge construction, Gordie Howe International Bridge, Réseau express métropolitain, Eglinton Crosstown LRT, Darlington Nuclear Refurbishment, Coastal GasLink Pipeline, Site C Generating Station, Oneida Energy Storage, Pickering Nuclear Generating Station Refurbishment, Kingstown Port Modernisation Project, Buffalo Pound Water Treatment Plant, Highway 407, Cross-Israel Highway, Quito International Airport, Union Pearson Express, Northeast Anthony Henday Drive, John Hart Generating Station, GO Expansion, Darlington New Nuclear Project
Press page aecon.com/press-room/news

Metrics

Valuation  
Market cap C$ 3.71B
Market cap (USD) $ 2.638B
P/E —
PEG —
P/BV —
P/S —
P/OCF —
P/FCF —
Dividend yield —
Turnover / mcap —
Returns  
ROE 1.6%
ROI 1.7%
ROIC 7.0%
Profit margin 0.29%
Growth  
Revenue growing Yes
Profits growing Yes
Revenue up 3y —
Revenue up 5y —
Earnings growth 3y (net profit CAGR) -20.7%
Quality  
Profitable Yes
Margin expanding Yes
Buying back stock —
Diluting (TTM) —
Debt/Equity —
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 44
Quality score 66.7%
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021 FY 2020 FY 2019 FY 2018
Revenue 5.435B 4.243B 4.644B 4.696B 3.977B 3.644B 3.46B 3.266B
Net profit 15.162M -59.524M 161.89M 30.381M 49.682M 88.03M 72.853M 59.014M

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

oct. 29, 2026

Toronto, Ontario, 27 octobre 2026 — Aecon est fière d’annoncer que le projet du passage supérieur Holdom à Burnaby, en Colombie-Britannique, a reçu un prix Envision Platinum™ de l’Institute for Sustainable Infrastructure (ISI).

Cette distinction, la plus haute reconnaissance décernée en vertu du cadre et du système de certification Envision en matière de développement durable, témoigne de l’engagement du partenariat général Aecon-Gateway Infrastructure Group et de l’Administration portuaire Vancouver Fraser à réaliser des infrastructures qui génèrent une valeur environnementale, sociale et économique durable. Administré par ISI, Envision est un cadre mondialement reconnu utilisé pour évaluer les projets d’infrastructure. Les projets sont soumis à une évaluation indépendante par une tierce partie qui examine un vaste éventail de critères, notamment la qualité de vie, l’intendance environnementale, la résilience climatique, l’efficacité des ressources et les avantages à long terme pour les collectivités.

« L’obtention d’un prix Envision Platinum souligne le dévouement de notre équipe et de nos partenaires et renforce la position d’Aecon à l’avant-garde de la mise en œuvre de solutions de construction novatrices et responsables », a déclaré Scott Marshall, vice-président principal, Grands projets, Civil Ouest, Groupe Aecon Inc. « Cette reconnaissance reflète le travail exceptionnel accompli pour établir une norme élevée en matière de livraison d’infrastructures durables et de création d’avantages durables pour les collectivités locales. »

Le nouveau passage supérieur à quatre voies renforcera la sécurité, facilitera les déplacements et optimisera l’efficacité du transport, tout en contribuant à la capacité commerciale du port de Vancouver, le plus grand port du Canada. Le projet comprend des améliorations au réseau routier, la construction d’une nouvelle station de pompage, le remplacement d’un passage à niveau ferroviaire par un lien de transport multimodal, ainsi que des mesures d’amélioration et de restauration des habitats naturels. De nouveaux espaces publics de rassemblement mettant en valeur l’art des Premières Nations sont également en cours d’aménagement.

Parmi les initiatives ayant contribué à l’obtention de la désignation Platine, mentionnons le recyclage des plastiques de construction dans le cadre de la Construction Plastics Initiative de Light House, le déploiement d’un système intégré de gestion de la durabilité ainsi que des pratiques d’approvisionnement responsable assorties d’un suivi du rendement. Par ailleurs, le projet a soutenu les principes de l’économie circulaire grâce à des initiatives de réduction des déchets, à l’utilisation accrue de matériaux recyclés et à l’adoption de pratiques de construction plus sobres en carbone.

Environ 84 % des déchets de construction du projet ont été détournés des sites d’enfouissement, tandis que les émissions ont été réduites grâce au carburant diesel renouvelable (utilisation de 98 %), aux solutions d’énergie hybride et aux véhicules électriques. La proportion de matériaux recyclés dans les achats du projet a atteint 13 %, excédant la cible de 5 %, alors que la politique d’approvisionnement durable a été respectée par l’ensemble des fournisseurs.

« Bien que le prix reconnaisse les réalisations accomplies à ce jour, nous demeurons déterminés à maintenir ces normes jusqu’à l’achèvement du projet », a déclaré Prabh K. Banga, vice-présidente, Développement durable, Groupe Aecon Inc. « Chez Aecon, nous sommes déterminés à intégrer le développement durable à chaque étape de la réalisation du projet. »

La désignation Platine obtenue par le projet de passage supérieur Holdom vient s’ajouter à la solide feuille de route d’Aecon en matière de réalisation d’infrastructures durables. Le projet s’ajoute à un portefeuille croissant de projets d’Aecon reconnus dans le cadre d’Envision, y compris le pont international Gordie Howe, qui a obtenu la certification Envision Platinum en 2021, et le projet d’amélioration de la deuxième concession de la région de York, qui a obtenu la certification Envision Bronze en 2022.

« Le prix Envision Platinum s’appuie sur notre feuille de route éprouvée en matière de réalisation d’infrastructures durables et de grande qualité qui répondent aux besoins commerciaux du Canada tout en créant des retombées durables pour les collectivités et l’environnement. Le projet du passage supérieur Holdom perpétue cet héritage et démontre ce qu’il est possible d’accomplir grâce à une solide collaboration avec les Premières Nations, la Ville de Burnaby, le CN, le gouvernement du Canada et notre entrepreneur concepteur-constructeur, le partenariat général Aecon-Gateway Infrastructure Group », a déclaré Jennifer Natland, vice-présidente, Immobilier et développement, Administration portuaire Vancouver Fraser.

L’Administration portuaire Vancouver Fraser réalise le projet du passage supérieur Holdom en partenariat avec la Ville de Burnaby et le CN, avec le soutien financier du gouvernement du Canada.

Oct 29, 2026

Toronto, Ontario – October 27, 2026 – Aecon is proud to announce that the Holdom Overpass Project in Burnaby, British Columbia, has been recognized with an Envision Platinum™ Award by the Institute for Sustainable Infrastructure (“ISI”).

The distinction is the highest-ranking award under the Envision sustainability framework and rating system, underscoring the commitment of the Aecon-Gateway Infrastructure Group General Partnership and the Vancouver Fraser Port Authority to delivering infrastructure that creates long-term environmental, social and economic value. Administered by ISI, Envision is a globally recognized framework used to evaluate infrastructure projects. Through an independent third-party verification process, projects are assessed across a broad range of criteria, including quality of life, environmental stewardship, climate resilience, resource efficiency and long-term community benefits.

“Receiving an Envision Platinum Award highlights the dedication of our team and partners and reinforces Aecon’s position at the forefront of implementing innovative and responsible construction solutions,” said Scott Marshall, Senior Vice President, Major Projects West, Aecon Group Inc. “This recognition reflects the outstanding work in setting a high standard for sustainable infrastructure delivery and creating lasting benefits for local communities.”

The new four-lane overpass will improve safety, accessibility and transportation efficiency while supporting trade capacity through the Port of Vancouver, Canada’s largest port. The project includes roadway improvements, a new pump station, replacement of an at-grade rail crossing with a multimodal transportation link, and habitat enhancements and restoration initiatives. New public gathering spaces featuring First Nation art are also being created.

The Platinum designation was supported by a range of sustainability initiatives, including recycling plastic construction waste through the Construction Plastics Initiative by Light House, implementing a project-wide sustainability management system, and adopting responsible procurement and performance-tracking practices. The project has also advanced circular economy objectives through waste diversion, recycled materials, and lower-emission construction practices.

Approximately 84% of the project's construction waste has been diverted from landfill, while emissions have been reduced through renewable diesel fuel (98% usage), hybrid power solutions and electric vehicles. Recycled materials account for 13% of purchased project goods, exceeding a 5% target, and the project’s Sustainable Procurement Policy achieved 100% supplier compliance.

“While the award recognizes achievements realized to date, we remain focused on maintaining these standards through project completion,” said Prabh K. Banga, Vice President, Sustainability, Aecon Group Inc. “At Aecon, we are committed to integrating sustainability into every stage of project delivery.”

The Envision Platinum designation for the Holdom Overpass Project builds on Aecon’s track record of delivering sustainable infrastructure. The project joins a growing portfolio of Aecon projects recognized under the Envision framework, including the Gordie Howe International Bridge, which achieved Envision Platinum certification in 2021, and York Region’s 2nd Concession Project, which earned Envision Bronze certification in 2022.

“The Envision Platinum award builds on our proven track record of delivering high-quality, sustainable infrastructure that supports Canada’s trade needs while creating lasting benefits for communities and the environment. The Holdom Overpass Project continues that legacy and reflects what’s possible through strong collaboration with First Nations, the City of Burnaby, CN, the Government of Canada, and our design-build contractor Aecon-Gateway Infrastructure Group General Partnership,” said Jennifer Natland, Vice President of Properties and Development, Vancouver Fraser Port Authority.

The Vancouver Fraser Port Authority is delivering the Holdom Overpass Project in partnership with the City of Burnaby and CN, with funding from the Government of Canada. To learn more about the Holdom Overpass Project, visit portvancouver.com/holdomoverpass .

About Aecon

Aecon Group Inc. (TSX: ARE) is a North American construction and infrastructure development company with global experience. Aecon delivers integrated solutions to private and public-sector clients through its Construction segment in the Civil, Urban Transportation, Nuclear, Utility and Industrial sectors, and provides project development, financing, investment, management, and operations and maintenance services through its Concessions segment. Join our online community on X, LinkedIn, Facebook, and Instagram @AeconGroupInc.

Aecon reports third quarter 2026 results Bull 6 Bear 0 Results

Oct 29, 2026

Toronto, Ontario – October 29, 2026: Aecon Group Inc. (TSX: ARE) (“Aecon” or the “Company”) today reported results for the third quarter of 2026, including the highest reported backlog in the history of Aecon.

“Third quarter performance demonstrated the results of Aecon’s powerful and consistent operating model with revenue increasing 26% and Adjusted EBITDA increasing 40% compared to the same period last year. Backlog reached a record $14.6 billion – with risk being thoughtfully allocated with over 80% of backlog tied to collaborative or non-fixed price contract models,” said Jean-Louis Servranckx, President and Chief Executive Officer, Aecon Group Inc. “Aecon’s growth is broad-based and founded on expanding recurring revenue programs, advancing pre-award work on key long-term projects, a strong Concessions portfolio, and direct line of sight into significant opportunities that are aligned to Aecon’s strategic end markets. We remain focused on disciplined execution, prudent risk management and delivering profitable growth for our shareholders.”

**HIGHLIGHTS

**All quarterly financial information contained in this news release is unaudited.

  • Revenue for the three months ended September 30, 2026 of $1,921 million was $390 million, or 26%, higher compared to the same period in 2025.

  • Operating profit of $83.1 million for the three months ended September 30, 2026 increased by $21.7 million compared to an operating profit of $61.4 million in the same period in 2025.

  • Adjusted EBITDA(1)(2) of $130.2 million for the three months ended September 30, 2026 (Adjusted EBITDA margin(3) of 6.8%) compared to Adjusted EBITDA of $92.7 million (Adjusted EBITDA margin of 6.1%) in the same period in 2025.

  • Record reported backlog at September 30, 2026 of $14,559 million, compares to backlog of $10,777 million at September 30, 2025.  

  • Record quarterly cash flow from operations of $417 million, resulting in strengthened financial position.

  • Aecon announced the achievement of Gold Partnership Accreditation in Indigenous Relations (“PAIR”) Certification – becoming the first construction company with nation-wide operations to achieve the highest level of certification from the Canadian Council for Indigenous Business in the PAIR program.

  • Aecon agreed to acquire additional fabrication capacity in Ontario, expanding Aecon’s nuclear fabrication network to four facilities and extending Aecon’s capabilities as Canada’s Nuclear Builder to support some of the largest nuclear refurbishment and new build projects in North America. Closing is anticipated in the fourth quarter of 2026.

NEW PROJECT AWARDS

  • On July 2, 2026, an Aecon consortium was awarded a multi-billion-dollar contract by Greenlight Electricity Centre Limited Partnership for the Greenlight Electricity Centre project in Alberta. The contract award follows the completion of early engineering and development work, and Aecon’s $1.7 billion majority share was added to its Construction segment backlog in the third quarter of 2026.

  • On July 13, 2026, an Aecon consortium was selected by the Vancouver Fraser Port Authority as the preferred proponent for the development phase of the Roberts Bank Terminal 2 – Landmass and Wharf progressive design-build project in British Columbia. Following a collaborative development phase, a design-build agreement is anticipated to be executed in the first quarter of 2028.

  • On July 17, 2026, an Aecon-led consortium completed the collaborative development phase and was awarded an $815 million contract by the City of Winnipeg for the North End Pollution Control Centre Sewage Treatment Plant Upgrade – Biosolids Facilities progressive design-build project in Manitoba. Aecon’s 33.3% share of the contract value was added to its Construction segment backlog in the third quarter of 2026. 

  • On July 30, 2026, an Aecon partnership executed a development phase agreement with New Brunswick Power to deliver civil works on the Mactaquac Life Achievement Project. Under a collaborative Early Contractor Involvement approach, design, schedule and cost estimates will advance during a 12-month development phase, with construction expected to commence in the second quarter of 2027 under a target price model.

  • On August 27, 2026, an Aecon-led joint venture executed alliance contracts with Metrolinx for the multi-billion-dollar GO Expansion project in Ontario. Aecon added $649 million to its Construction segment backlog in the third quarter of 2026, with the balance of Aecon’s share of $65 million having been added to backlog in the second quarter of 2026.

  • On September 21, 2026, an Aecon joint venture and an Aecon consortium were awarded contracts by Ontario Power Generation with an aggregate value of $3 billion for the Pickering Nuclear Generating Station Refurbishment. Aecon’s $1.75 billion share of the contracts was added to backlog in the third quarter of 2026 and represents the largest nuclear award in Aecon’s history.

  • Aecon executed an agreement with a Tier-1 telecommunications operator to form Maple Fibre, a majority-controlled strategic alliance to finance, design, build, and own next-generation network infrastructure.  Aecon Concessions holds an equity interest in the partnership, and Aecon Utilities has commenced construction for the strategic alliance in Ontario.

  • Subsequent to quarter-end:
    Aecon was awarded a $155 million contract by the City of Calgary for the Green Line LRT Project – Bow River Package. Aecon added the value of the contract to its Construction segment backlog in the fourth quarter of 2026. Construction will now commence, with expected completion mid-2029.
    Aecon was awarded a US$89 million contract for the Anguilla Airport Redevelopment Program Airfield Expansion project. Aecon added the value of the contract to its Construction segment backlog in the fourth quarter of 2026. Construction will commence in the first quarter of 2027, with expected completion in the second quarter of 2029.

CONSOLIDATED FINANCIAL HIGHLIGHTS

Expand Table

$ millions (except per share amounts) Three months ended Nine months ended
September 30 September 30
--- --- --- --- --- --- --- --- ---
2026 2025 2026 2025
--- --- --- --- --- --- --- --- ---
Revenue $ 1,920.6 $ 1,530.2 $ 4,808.6 $ 3,893.5
Gross profit 201.6 131.3 456.8 250.0
Marketing, general, and administrative expense (98.3) (54.7) (272.2) (171.1)
Income from projects accounted for using the equity method 6.7 2.1 6.8 5.8
Other income 3.2 7.0 6.8 14.4
Depreciation and amortization (30.2) (24.4) (86.7) (76.1)
Operating profit 83.1 61.4 111.5 22.9
Finance income 2.4 1.9 6.5 5.0
Finance cost (8.3) (13.6) (160.9) (38.4)
Profit (loss) before income taxes 77.1 49.7 (42.9) (10.4)
Income tax (expense) recovery (24.5) (9.3) (30.7) 4.9
Profit (loss) 52.6 40.4 (73.6) (5.5)
Non-controlling interests 0.3 (0.4) 0.5 -
Profit (loss) attributable to shareholders $ 52.9 $ 40.0 $ (73.1) $ (5.6)
Gross profit margin(4) 10.5% 8.6% 9.5% 6.4%
MG&A as a percent of revenue(4) 5.1% 3.6% 5.7% 4.4%
Adjusted EBITDA(2) $ 130.2 $ 92.7 $ 244.6 $ 137.3
Adjusted EBITDA margin(3) 6.8% 6.1% 5.1% 3.5%
Operating margin(4) 4.3% 4.0% 2.3% 0.6%
Adjusted profit (loss) attributable to shareholders(2) $ 61.7 $ 33.1 $ 72.2 $ (8.0)
Earnings (loss) per share – basic $ 0.77 $ 0.63 $ (1.09) $ (0.09)
Earnings (loss) per share – diluted $ 0.74 $ 0.60 $ (1.09) $ (0.09)
Adjusted earnings (loss) per share – basic(3) $ 0.90 $ 0.52 $ 1.07 $ (0.13)
Adjusted earnings (loss) per share – diluted(3) $ 0.86 $ 0.49 $ 1.03 $ (0.13)
Backlog (at end of period) $ 14,559 $ 10,777
  1. This press release presents certain non-GAAP and supplementary financial measures, as well as non-GAAP ratios to assist readers in understanding the Company's performance (GAAP refers to IFRS Accounting Standards). Further details on these measures and ratios are included in the “Non-GAAP and Supplementary Financial Measures” and “Reconciliations and Calculations” sections of this press release.

  2. This is a non-GAAP financial measure. Refer to the “Non-GAAP and Supplementary Financial Measures” and “Reconciliations and Calculations” sections of this press release for more information on each non-GAAP financial measure.

  3. This is a non-GAAP ratio. Refer to the “Non-GAAP and Supplementary Financial Measures” section of this press release for more information on each non-GAAP ratio.

  4. This is a supplementary financial measure. Refer to the “Non-GAAP and Supplementary Financial Measures” section of this press release for more information on each supplementary financial measure.

Revenue for the three months ended September 30, 2026 of $1,921 million was $390 million, or 26%, higher than in the third quarter of 2025. In the Construction segment, revenue was higher by $410 million from increases in utilities ($184 million), nuclear ($130 million), civil ($45 million), industrial operations ($42 million), and urban transportation solutions ($9 million). The increase in Construction revenue was driven primarily by a higher volume of electrical transmission and distribution work in the utilities sector in both Canada and the United States, and from an increase in refurbishment, decommissioning, and engineering services work at nuclear facilities in Canada and the United States. In the Concessions segment, revenue of $2 million for the three months ended September 30, 2026 was unchanged from the same period in 2025, while inter-segment revenue eliminations increased by $20 million, largely due to an increase in construction activity between the Construction and Concessions segments.

Operating profit of $83.1 million for the three months ended September 30, 2026 increased by $21.7 million compared to an operating profit of $61.4 million in the same period of 2025. This higher operating profit was largely driven by an increase in gross profit of $70.3 million compared to the same period in 2025. In the Construction segment, gross profit in the third quarter of 2026 increased by $73.5 million primarily from higher volume and improvements in gross profit margin in civil, nuclear, and urban transportation solutions, and the gross profit impact of higher volume in utilities operations. These increases were partially offset by lower gross profit margin in industrial operations. In the Concessions segment, gross profit decreased by $3.7 million compared to the same period of 2025 primarily related to the accounting for network assets under construction where construction profit earned in the Construction segment is initially de-recognized within the Concessions segment and subsequently re-earned when the constructed asset is leased to the customer. In Corporate and Other, gross profit increased by $0.5 million as a result of higher inter-segment cost recoveries from projects.

Marketing, general and administrative expense (“MG&A”) for the three months ended September 30, 2026 increased by $43.6 million compared to the same period of 2025. The increase was primarily due to higher personnel costs and the impact of incentive compensation plans reflecting ongoing investments in organizational capacity to support revenue growth and performance, as well as the inclusion of MG&A from recent acquisitions. MG&A was also impacted by higher ERP implementation costs of $4.8 million associated with investments in technology tools and systems to support growing operations and higher acquisition-related costs of $2.1 million. When combined, impacts from incentive plans, ERP implementation costs, acquisition-related costs and the MG&A from recent acquisitions represented approximately three-quarters of the increase in MG&A in the third quarter. MG&A as a percentage of revenue for the third quarter increased to 5.1% in 2026 from 3.6% in 2025.

Reported backlog at September 30, 2026 of $14,559 million compares to backlog of $10,777 million at September 30, 2025. New contract awards of $5,988 million were booked in the third quarter of 2026 compared to $1,561 million in the same period in 2025.

REPORTING SEGMENTS

Aecon reports its financial performance on the basis of two segments: Construction and Concessions, which are described in the Company’s September 30, 2026 Management’s Discussion and Analysis (“Q3 2026 MD&A”).

CONSTRUCTION SEGMENT

Financial Highlights

Expand Table

$ millions Three months ended Nine months ended
September 30 September 30
--- --- --- --- --- --- --- --- ---
2026 2025 2026 2025
--- --- --- --- --- --- --- --- ---
Revenue $ 1,937.8 $ 1,527.9 $ 4,825.5 $ 3,883.4
Gross profit $ 206.2 $ 132.6 $ 461.7 $ 252.3
Adjusted EBITDA(1) $ 131.5 $ 88.4 $ 263.2 $ 127.0
Operating profit $ 100.7 $ 70.4 $ 171.1 $ 55.3
Gross profit margin(3) 10.6% 8.7% 9.6% 6.5%
Adjusted EBITDA margin(2) 6.8% 5.8% 5.5% 3.3%
Operating margin(3) 5.2% 4.6% 3.5% 1.4%
Backlog (at end of period) $ 14,538 $ 10,757
  1. This is a non-GAAP financial measure. Refer to the “Non-GAAP and Supplementary Financial Measures” and “Reconciliations and Calculations” sections of this press release for more information on each non-GAAP financial measure.

  2. This is a non-GAAP ratio. Refer to the “Non-GAAP and Supplementary Financial Measures” and “Reconciliations and Calculations” sections of this press release for more information on each non-GAAP ratio.

  3. This is a supplementary financial measure. Refer to the “Non-GAAP and Supplementary Financial Measures” section of this press release for more information on each supplementary financial measure.

Revenue in the Construction segment for the three months ended September 30, 2026 of $1,938 million was $410 million, or 27%, higher than in the same period of 2025. The largest increase in revenue occurred in utilities operations ($184 million) driven by a higher volume of electrical transmission and distribution work in Canada and the United States, which includes contributions from the acquisitions of KPC and Duna Services completed in the first quarter of 2026, as well as from an increase in telecommunications, gas distribution, and battery energy storage systems work. In nuclear operations, revenue increased ($130 million) due to a higher volume of refurbishment, decommissioning, and engineering services work at nuclear generating stations in Ontario and the United States. Revenue in civil operations increased ($45 million) primarily from a higher volume of work related to the civil infrastructure components of power and rail projects, and foundations work, partially offset by a lower volume of highway, road, and bridge construction activity. In industrial operations, revenue increased ($42 million), primarily from a higher volume of field construction work at industrial manufacturing facilities in the United States, with most of the revenue growth attributable to the Bodell Construction and Trinity Industrial Services businesses acquired in the third quarter of 2025. Revenue was also higher from an increase in the industrial component of power generation projects, partially offset by a lower volume of industrial work at wastewater treatment facilities in the period. Revenue increased in urban transportation solutions ($9 million) driven by a higher volume of subway and commuter rail system work, partially offset by a lower volume of work on light rail transit (“LRT”) projects in Ontario and Québec.

Operating profit in the Construction segment of $100.7 million in the three months ended September 30, 2026 compares to an operating profit of $70.4 million in the same period in 2025, an increase in operating profit of $30.3 million. Operating profit was higher in civil and nuclear operations driven by higher volume and an improvement in gross profit margin. Operating profit in utilities operations was lower after a volume-driven improvement in gross profit was more than offset by higher MG&A, higher depreciation and amortization, and lower gains related to changes in the fair value of contingent consideration from recent business acquisitions. In industrial operations, operating profit decreased due to lower gross profit margin, while operating profit in urban transportation solutions was unchanged. Additionally, business acquisition costs and amortization of acquisition-related intangible assets were $6.5 million in the third quarter of 2026 compared to cost recovery of $1.4 million in the same period of 2025, for an unfavourable impact on operating profit of $7.9 million in the current period.

Construction segment backlog at September 30, 2026 was $14,538 million, which was $3,781 million higher than the same date in 2025. Backlog increased year-over-year in industrial ($2,344 million), nuclear ($1,234 million), urban transportation solutions ($262 million), and utilities operations ($223 million), and decreased in civil operations ($282 million). New contract awards totaled $6,005 million in the third quarter of 2026 and $8,670 million in the first nine months of 2026, compared to $1,559 million and $7,999 million, respectively, in the same periods of 2025.

During the first nine months of 2026, Aecon (including Aecon joint ventures, alliances and consortiums) was awarded the following select contracts:

  • the Greenlight Electricity Centre project in Alberta;

  • the North End Pollution Control Centre Sewage Treatment Plant Upgrade – Biosolids Facilities project for the City of Winnipeg in Manitoba;

  • the GO Expansion project in Ontario for the civil and track alliance scopes; and

  • the Pickering Nuclear Generating Station Refurbishment project in Ontario including the Unit 5 refurbishment and four-unit turbine generator replacement scopes.

In addition, consortiums and alliances in which Aecon is a participant executed development or validation phase agreements for the Mactaquac Life Achievement Project in New Brunswick, the Roberts Bank Terminal 2 – Landmass and Wharf progressive design-build project in British Columbia, the Arctic Over-the-Horizon Radar Program Stage 1 project in Ontario, and the Hamilton Light Rail Transit Civil and Utilities Works project in Ontario. Given the nature of the development or validation phase of these programs, the additions to backlog have been de minimis even though the potential amounts which may ultimately enter backlog could be substantial.

CONCESSIONS SEGMENT

Financial Highlights

Expand Table

$ millions Three months ended Nine months ended
September 30 September 30
--- --- --- --- --- --- --- --- ---
2026 2025 2026 2025
--- --- --- --- --- --- --- --- ---
Revenue $ 1.9 $ 2.3 $ 5.8 $ 5.8
Gross profit (loss) $ (3.7) $ - $ (4.2) $ (2.0)
Income from projects accounted for using the equity method $ 7.0 $ 1.6 $ 7.8 $ 6.0
Adjusted EBITDA(1) $ 11.5 $ 14.5 $ 29.0 $ 43.7
Operating profit (loss) $ 1.3 $ 1.0 $ (1.1) $ 2.3
Backlog (at end of period) $ 21 $ 20
  1. This is a non-GAAP financial measure. Refer to the “Non-GAAP and Supplementary Financial Measures” and “Reconciliations and Calculations” sections of this press release for more information on each non-GAAP financial measure.

Aecon holds a 50.1% interest in Skyport, the concessionaire responsible for the Bermuda airport’s operations, maintenance, and commercial functions, and the entity that will manage and coordinate the overall delivery of the Bermuda International Airport Redevelopment Project over a 30-year concession term that commenced in 2017. Aecon’s interest in Skyport is accounted for using the equity method. Aecon’s concession interests in the Eglinton Crosstown LRT, Finch West LRT, Gordie Howe International Bridge, Waterloo LRT, and the GO Expansion On-Corridor Works projects are joint ventures that are also accounted for using the equity method.

For the three and nine months ended September 30, 2026, revenue in the Concessions segment was $2 million and $6 million, respectively, which was unchanged in both periods compared to 2025.

For the three months ended September 30, 2026, operating profit in the Concessions segment of $1.3 million increased by $0.3 million compared to the same period of 2025. The higher operating profit was due to an increase in operating results from Skyport and higher development fees, partially offset by the deferral of intercompany construction profit related to network assets under development.

In the second quarter of 2026, Maple Fibre, a majority-controlled entity within Concessions initiated the development of a network asset in Canada. The entity is financed through equity and debt that are non-recourse to Aecon. Aecon Utilities has been contracted to deliver the network asset for Concessions, with any profit earned in the Construction segment initially being de-recognized within the Concessions segment and subsequently re-earned when the constructed asset is leased to the customer.

OUTLOOK

Aecon expects double digit revenue growth in 2026. The revenue growth outlook is based on secured backlog exceeding $14 billion, recurring revenue programs, recent acquisitions, and a pipeline of project opportunities tied to nuclear and conventional power, critical resource development, mass transit, water, defence, and digital infrastructure.

In the Construction segment, demand for Aecon’s services across its markets is strong, with opportunities across all sectors under appropriate risk-adjusted contract models. Aecon’s expectation for a broad-based revenue increase in 2026 is underpinned by: (i) recently awarded major projects which include water storage and hydroelectric infrastructure, data centre power generation, water treatment facilities, electricity storage, transmission and distribution, and nuclear generating station refurbishment; (ii) contributions from strategic business acquisitions in the industrial and utilities sectors; (iii) ongoing strength from an extensive portfolio of small and mid-sized work programs that Aecon executes across regions, sectors, and clients, which includes recurring work executed under master service agreements, and (iv) the ramp-up of projects under multi-year, lower risk contract models in new nuclear construction and mass transit and mobility.

Aecon expects further revenue growth in 2027 based on the above factors and ongoing development phase work to advance the delivery of several significant long-term projects. This includes recently awarded major projects entering progressive and collaborative development or definition phases, including the Arctic Over-the-Horizon Radar Program Stage 1 project in Ontario, the Roberts Bank Terminal 2 – Landmass and Wharf project in British Columbia, the Hamilton LRT Civil and Utilities Works project in Ontario, and the Mactaquac Life Achievement Project in New Brunswick.

In the Concessions segment, there are several opportunities to add to the existing portfolio of Canadian and international concessions in the next 6 to 12 months to support trends in aging infrastructure, mobility, connectivity, energy, and population growth.

Operating profitability in recent years was negatively impacted by the fixed price legacy projects. The last remaining legacy project reached substantial completion in the second quarter of 2026. Aecon and its joint operations partners are dedicating all necessary resources to pursue fair and reasonable commercial resolutions (see Section 10.2 “Contingencies” in the Q3 2026 MD&A, and Section 13 “Risk Factors” in the 2025 Annual MD&A regarding the risk on the large fixed price legacy project entered into prior to 2018 by a joint operation in which Aecon is a participant). The finalization of this project is anticipated to lead to improved profitability and margin predictability going forward.

Beyond the legacy projects, Aecon’s deliberate shift toward a greater weighting of improved risk-adjusted work programs, in combination with a strong focus on operational excellence, is anticipated to support a stabilization and gradual improvement of Adjusted EBITDA margins in the Construction segment in 2026 and 2027, respectively.

Management will continue to monitor the impact of a dynamic geopolitical environment as well as announced and threatened tariffs and non-tariff measures on the Company’s operations. Higher fuel costs and the introduction of tariffs and/or non-tariff measures could cause increased purchased material costs and/or reduced availability, downward or upward changes to the level of demand for Aecon’s services, as well as delays by some private clients in moving forward with projects.

Aecon plans to maintain a disciplined capital allocation approach focused on long-term shareholder value through acquisitions and divestitures, organic growth, dividends, capital and operational investments, and share repurchases on an opportunistic basis. Aecon is also focused on making strategic investments in its operations and systems to provide entry into and greater access to attractive markets, increase operational effectiveness, and support the growth of its concessions portfolio. Aecon expects capital expenditures in 2026 to exceed 2025 levels to support growth initiatives and investments designed to enhance execution resiliency and enable the ambitions of key sectors in a disciplined manner.

CONSOLIDATED RESULTS

The consolidated results for the three and nine months ended September 30, 2026 and 2025 are available at the end of this news release.

Expand Table

CONSOLIDATED BALANCE SHEET

September 30 December 31
$ thousands 2026 2025
Cash and cash equivalents $ 1,065,725 $ 486,019
Other current assets 2,665,531 2,388,844
Property, plant and equipment 518,196 399,910
Other long-term assets 763,068 715,453
Total Assets $ 5,012,520 $ 3,990,226
Current portion of long-term debt $ 62,836 $ 43,903
Preferred Shares of Aecon Utilities 320,000 188,840
Other current liabilities 2,999,300 2,374,027
Long-term debt 141,412 110,560
Other long-term liabilities 480,921 344,141
Total Equity 1,008,051 928,755
Total Liabilities and Equity $ 5,012,520 $ 3,990,226

**CONFERENCE CALL

**

A conference call and live webcast has been scheduled for 9 a.m. (Eastern Time) on Friday, October 30, 2026. A live webcast of the conference call can be accessed using this link and will be available at www.aecon.com/InvestorCalendar . Participants can also dial-in to the conference call and pre-register using this link . After registering, an email will be sent, including dial-in details and a unique access code required to join the live call. Please ensure you have registered at least 15 minutes prior to the conference call time.

An accompanying presentation of the third quarter 2026 financial results will also be available after market close on October 29, 2026 at www.aecon.com/investing . For those unable to attend, a replay will be available within one hour following the live webcast and conference call at the same webcast link above.

ABOUT AECON

Aecon Group Inc. (TSX: ARE) is a North American construction and infrastructure development company with global experience. Aecon delivers integrated solutions to private and public-sector clients through its Construction segment in the Civil, Urban Transportation, Nuclear, Utility and Industrial sectors, and provides project development, financing, investment, management, and operations and maintenance services through its Concessions segment. Join our online community on X, LinkedIn, Facebook, and Instagram @AeconGroupInc.

Prompts

Aecon Group Inc. (ticker ARE), listed in Canada.

ETFs Holding Aecon Group Inc.

ETF Weight in ETF Shares Market value As of
AVDV 0.17% 860,569 $ 33.417M Nov 16, 2026
DFIS 0.13% 193,855 $ 7.521M Nov 12, 2026
AVDS 0.10% 9,454 $ 367.106K Nov 16, 2026
AVDE 0.04% 182,161 $ 7.073M Nov 16, 2026
DISV 0.03% 39,551 $ 1.534M Nov 12, 2026
DFIC 0.03% 118,206 $ 4.586M Nov 12, 2026
DXIV 0.02% 1,200 $ 46.554K Nov 12, 2026
DFSI 0.02% 5,769 $ 223.811K Nov 12, 2026
DFAX 0.02% 58,404 $ 2.266M Nov 12, 2026
DFAI 0.01% 58,810 $ 2.282M Nov 12, 2026