Vancouver, BC, Canada – First Majestic Silver Corp. (NYSE:AG) (TSX:AG) (FSE:FMV) (the “Company” or “First Majestic”) announces that total production in the fourth quarter of 2025 from the Company’s four producing underground mines in Mexico,…
Vancouver, BC, Canada – First Majestic Silver Corp. (NYSE:AG) (TSX:AG) (FSE:FMV) (the “Company” or “First
Majestic”) announces that total production in the fourth quarter of 2025 from the Company’s four producing
underground mines in Mexico, namely, the Santa Elena Silver/Gold Mine, the San Dimas Silver/Gold Mine, the Los
Gatos Silver Mine (the Company holds a 70% interest in the Los Gatos Joint Venture that owns the mine) and the
La Encantada Silver Mine reached 7.8 million attributable silver equivalent (“AgEq”) ounces, consisting of 4.2
million silver (“Ag”) ounces, 41,417 gold (“Au”) ounces, 14.2 million pounds of zinc (“Zn”), 8.1 million pounds of
lead (“Pb”) and 235,886 pounds of copper (“Cu”).
Q4 2025 PRODUCTION HIGHLIGHTS
• Record Quarterly Silver Production (+77% Y/Y): The Company produced 4.2 million silver ounces in Q4
2025 representing a 77% increase when compared to 2.4 million silver ounces produced in Q4 2024. Total
silver production in the quarter included 1.5 million ounces of attributable silver production from Los
Gatos.
• Increased Silver Equivalent Production (+37% Y/Y): The Company produced 7.8 million AgEq ounces in Q4
2025 (8.9 million AgEq ounces using updated 2025 guidance assumptions for metal prices), representing a
37% increase compared to 5.7 million AgEq ounces produced in Q4 2024. This growth was primarily driven
by a 77% increase in attributable consolidated silver production, including contributions from Los Gatos, as
well as improved production at San Dimas.
• Continued Active Exploration Program: During the fourth quarter, the Company completed a total of
57,305 metres (“m”) of drilling across its mines in Mexico and the United States. Throughout the quarter,
up to 27 drill rigs were active consisting of five rigs at Los Gatos, six rigs at Santa Elena, 13 rigs at San
Dimas, one rig at La Encantada and two rigs at Jerritt Canyon.
• Positive Exploration Results: In December, the Company announced positive exploration drilling results for
the Santo Niño and Navidad targets at Santa Elena as well as the Luna Zone (Ermitaño mine); Santo Niño
and Navidad results significantly increase the gold and silver mineralization footprint beyond the currently
declared 2024 Inferred Mineral Resources. This continued exploration success prompted the launch of
preliminary mine planning studies for the Navidad and Santo Niño discoveries with the goal of integrating
both into the district’s Life of Mine.
• Sale of the Del Toro Silver Mine: In December, First Majestic entered into a definitive agreement to sell its
100%-owned past producing Del Toro Silver Mine located in the Municipality of Chalchihuites, Zacatecas,
Mexico to Sierra Madre Gold & Silver Ltd. for total consideration in cash and Sierra Madre shares of up to
2
$60 million, comprised of upfront consideration of $30 million payable upon closing of the transaction, and
an additional $30 million in delayed and contingent consideration.
• Strong Safety Performance Continues: The consolidated Total Reportable Incident Frequency Rate
(“TRIFR”) for 2025 was 0.55, below the Company’s 2025 target KPI of 0.70. The Lost Time Incident
Frequency Rate (“LTIFR”) was 0.12, positioning the Company as best in class amongst its peer group. As a
result of the Company’s continued industry leading safety efforts, Santa Elena was recognized for
“Excellence in Safety” by the Mexican Mining Chamber, in the Underground Mining category with more
than 500 workers.
FY 2025 HIGHLIGHTS
• Met upwardly revised production guidance: With full year 2025 production of 31.1 million silver
equivalent ounces including 15.4 million ounces of silver (guidance range: 14.8 – 15.8 million ounces),
147,433 ounces of gold (guidance range: 135,000 – 144,000 ounces), 56.7 million pounds of zinc (guidance
range: 52 – 56 million pounds) and 32.3 million pounds of lead (guidance range: 33 – 35 million pounds),
the Company met or exceeded both its original and July 2025 upwardly revised production guidance as a
result of solid operating execution across all four producing mines in 2025.
• Acquisition of Gatos Silver, Inc.: On January 16, 2025, the Company completed the acquisition of Gatos
Silver, adding a 70% joint venture interest in the Los Gatos underground silver mine in Chihuahua, Mexico
to its portfolio of assets (see news release dated January 16, 2025). The Los Gatos operation was
successfully integrated into First Majestic’s portfolio in 2025.
• Record Consolidated Silver Production: First Majestic produced 15.4 million ounces of silver in 2025, a
new annual record for the Company, and up 84% from 2024. The significant jump in silver production can
be attributed to the acquisition of Los Gatos, as well as a 19% increase in production at San Dimas and an
18% increase in production at La Encantada.
• Another High-Grade Gold and Silver Discovery: The Company announced the discovery of a new, high-
grade gold and silver vein - Santo Niño - on May 28, 2025 at the Santa Elena property, approximately 900
m from the Santa Elena plant. This followed the Company’s 2024 discovery of the Navidad/Winter vein
hosted system at Santa Elena. Additional drilling at Santo Niño since the discovery announcement has
substantially expanded the footprint of gold and silver mineralization (see news release dated December
15, 2025). A maiden Inferred Mineral Resource estimate for Santo Niño is expected to be included in the
Company’s Annual Information Form for the year ended December 31, 2025, which will be filed at the end
of Q1 2026.
• Senior Management Update: As part of First Majestic’s continued growth strategy and ongoing succession
planning, the Company announced the promotion of Mani Alkhafaji to the new role of President & Chief
Corporate Development Officer, effective January 1, 2026, with Keith Neumeyer continuing to serve as
Chief Executive Officer of First Majestic from January 1, 2026 onwards.
“2025 was truly a transformational year for First Majestic,” said Keith Neumeyer, CEO. “The acquisition and
successful integration of Gatos, improved operational performance at San Dimas and La Encantada, combined with
world-class discoveries at Santa Elena could not have come at a better time. I am pleased to have First Majestic
meet or beat our upwardly revised production guidance during this favorable metal price environment. Our team
delivered when it matters most, achieving multiple production records and key milestones while maintaining our
strong commitment to safety. As we close out 2025 on a positive note, I am excited about the outlook for 2026,
with several important initiatives underway, including the Santa Elena mill expansion, increased mine throughput
and recovery at Los Gatos, and another robust exploration program across our portfolio.”
3
Impact of high silver prices on by-products conversion ratio (AgEq):
Throughout 2025, silver prices have outperformed gold, lead, and zinc. As a primary silver producer, this price
environment is favorable and strengthens the Company’s overall economics. However, silver’s outperformance
relative to the Company’s by-product metals results in a lower silver-equivalent (AgEq) conversion ratio for those
by-products.
As a result, reported AgEq production and unit cost metrics, including cash costs and AISC per AgEq ounce, may
appear less favorable, as fewer AgEq ounces are attributed to by-product production under the lower conversion
ratio, despite improved underlying economic performance. As a result of the rapid silver price increases in 2025,
relative to by-product metal prices, the Company’s reported Q4 2025 production was 1.1 million AgEq ounces
lower (1.3 million AgEq ounces lower for FY2025) compared to AgEq ounces produced using the Company’s
updated 2025 guidance assumptions for metal prices.
Attributable Consolidated Production Details:
Q4 Q4 Y/Y
FY FY Y/Y
2025 2024 Change Attributable Consolidated Production Results 2025 2024 Change
1,058,276 745,124 42% Ore processed/tonnes milled 4,003,456
2,686,742
49%
7,845,686 5,713,289 37% Silver equivalent ounces produced 31,060,764 21,655,427 43%
4,165,334 2,353,865 77% Silver ounces produced 15,435,506 8,400,796 84%
41,417 39,506 5% Gold ounces produced 147,433 156,542 (6)%
14,238,927 N/A N/A Zinc pounds produced 56,690,291 N/A N/A
8,108,949 N/A N/A Lead pounds produced 32,264,292 N/A N/A
235,886 N/A N/A Copper pounds produced 920,509 N/A N/A
I. Consolidated production values include attributable ounces from the Los Gatos Silver Mine (70%) from January 16, 2025 onwards.
Q4 2025 Mine-by-Mine Production Details:
Mine
Ore
Processed
Tonnes
per Day
Ag
Grade
(g/t)
Au
Grade
(g/t)
Ag
Recovery
Au
Recovery
Ag Oz
Produced
Au Oz
Produced
AgEq Oz
Produced
Los Gatos (100%) 324,143 3,562 235 0.25 87% 50% 2,130,336 1,277 2,988,030
Los Gatos (70%) 226,900 2,493 235 0.25 87% 50% 1,491,235 894 2,091,621
Santa Elena 283,721 3,118 62 2.90 64% 95% 358,185 25,083 2,279,397
San Dimas 243,807 2,679 189 2.05 89% 94% 1,315,711 15,066 2,449,162
La Encantada 303,848 3,339 140 0.00 73% 90% 1,000,203 32 1,002,725
I. Certain amounts shown in this table may not add exactly to the total amount due to rounding differences.
II. The metal prices that were used to calculate the silver equivalent ounces were silver: $54.83/oz, gold: $4,142/oz, lead: $0.89/lb.; zinc: $1.44/lb,
and copper: $5.04/lb.
III. Jerritt Canyon was placed on temporary suspension in March 2023. In-circuit recovery efforts performed in Q4 2025 resulted in production of 342
gold ounces or 22,781 AgEq ounces at Jerritt Canyon not shown in the table above.
IV. AgEq ounces for the Los Gatos Silver Mine include 14,238,927 lbs. zinc, 8,108,949 lbs. lead and 235,886 lbs. copper (70% attributable basis), and
20,341,324 lbs. zinc, 11,584,213 lbs. lead and 336,977 lbs. copper (100% basis).
4
Los Gatos Silver Mine (reported on a 70% attributable basis):
• During the fourth quarter, Los Gatos produced 2,091,621 attributable AgEq ounces, consisting of 1,491,235
ounces of silver, 14,238,927 pounds of zinc, 8,108,949 pounds of lead, 235,886 pounds of copper and 894
ounces of gold. Production at Los Gatos improved sequentially from the prior quarter primarily due to
improved mobile equipment availability, leading to normalized mining rates.
• The mill processed a total of 226,900 tonnes of ore, with head grades of 235 g/t silver, 3.88% zinc, 1.94%
lead, and 0.25 g/t gold. Management continues to focus on achieving a sustainably higher mill throughput
at Los Gatos by increasing mining rates. The Company has engaged a new contractor to increase
development rates and is targeting a sustained increase in ore throughput to 4,000 tpd, based on
operating days, in the second half of 2026.
• Silver, zinc, lead and gold recoveries during the quarter averaged 87%, 73%, 86% and 50%, respectively.
• During the quarter, five surface drill rigs completed 10,954 m of drilling on the property. Drilling continued
at the South-East Deeps, Central Deeps and North-West Deeps zones, as well as at other greenfield targets.
Santa Elena Silver/Gold Mine:
• Santa Elena produced 2,279,397 AgEq ounces during the quarter, a decrease of 16% year-over-year,
consisting of 358,185 ounces of silver and 25,083 ounces of gold. While silver production and higher silver
prices are positively impacting economics, reported silver equivalent production was impacted negatively
by the rising silver price in the quarter. Silver production was down only 6% while gold production was
down 15% year-over-year primarily due to lower grade silver and gold ore from the lower levels of the
Ermitaño mine, as expected under the 2025 mining plan.
• The mill processed a quarterly record of 283,721 tonnes of ore in the fourth quarter, 4% higher than the
same period last year, with average silver and gold head grades of 62 g/t and 2.91 g/t, respectively.
Average silver ore grades decreased 7%, while gold ore grades declined 11% for the quarter, in line with
the mine plan.
• Silver and gold recoveries during the quarter averaged 64% and 95%, respectively, compared to 69% and
96% in the same period last year. Lower recoveries were anticipated and are a direct correlation to lower
feed grades.
• During the quarter, six drill rigs, consisting of three surface rigs and three underground rigs, completed
10,846 m of drilling on the property. Drilling focused on testing extensions of the newly discovered Santo
Niño and Navidad resources, and the conversion of Inferred Mineral Resources to Indicated Mineral
Resources at Ermitaño-Luna.
San Dimas Silver/Gold Mine:
• San Dimas produced 2,449,162 AgEq ounces during the quarter representing a 10% increase compared to
Q4 2024, consisting of 1,315,711 ounces of silver and 15,066 ounces of gold. Silver production increased
by 10%, while gold production increased by 23%, when compared to the same period last year. The strong
quarterly performance was a result of increased throughput and gold grades, as well as improved
recoveries, partially offset by slightly lower silver grades.
• The mill processed a total of 243,807 tonnes of ore, an increase of 11% compared to Q4 2024, with
average silver and gold grades of 189 g/t and 2.05 g/t, respectively, compared with 195 g/t and 1.88 g/t,
respectively, in the same period last year. Higher throughput was driven by increased milling rates and
above-nameplate mill performance during the quarter achieved through improved mining rates as a result
of continued improvements in drilling and blasting efficiencies, development waste to ore conversion and
ore stockpiling earlier in the year.
5
• Silver and gold recoveries during the quarter averaged 89% and 94%, respectively, compared to 87% and
93%, respectively, in the same period last year.
• During the quarter, a total of 13 drill rigs consisting of two surface rigs and 11 underground rigs completed
27,753 m of drilling on the property. Drilling focused on the Coronado, Elia, and Regina veins.
La Encantada Silver Mine:
• During the quarter, La Encantada produced 1,000,203 ounces of silver, representing a 32% increase
compared to Q4 2024, driven primarily by a 20% increase in ore processed, and an 11% increase in silver
grades. Production at La Encantada improved significantly due to improved ore flow and mine
development rates resulting from management initiatives and the engagement of a new mine
development contractor.
• The mill processed a total of 303,848 tonnes of ore, a 20% increase over the same period last year, with an
average silver grade of 140 g/t, compared to 126 g/t in the same period last year.
• Silver recovery for the quarter was 73%, consistent with Q4 2024.
• During the quarter, one surface drill rig completed 1,863 m of drilling on the property. The Company is
currently testing a new exploration target, La Esquina.
Jerritt Canyon Gold Mine:
• During the quarter, up to two surface drill rigs completed 5,889 m of drilling on the property, contributing
to the Company’s total of 18,410 m of exploration drilling at Jerritt Canyon in 2025, surpassing its guidance
of 18,000 m. Drilling was focused on greenfield exploration and Mineral Resource addition. The Company
plans to release the 2025 drill program results in the first quarter of 2026.
6
2026 OUTLOOK
First Majestic is pleased to announce the Company’s consolidated 2026 production and cost guidance. In 2026,
the Company expects to achieve total attributable production from its four operating mines in Mexico of between
13.0 to 14.4 million ounces of silver, 116,000 to 129,000 ounces of gold, 52.4 to 58.2 million pounds of zinc, 34.2 to
38.1 million pounds of lead, and 1.1 to 1.3 million pounds of copper. The decrease in forecasted production
relative to 2025 is partially driven by lower metal grades resulting from a reduced cut-off grade due to improved
economics as a result of higher forecasted metal prices in 2026, partially offset by higher throughput with mill and
mine throughput expansion projects currently underway, with anticipated completion in H2 2026.
A mine-by-mine breakdown of the Company’s 2026 production and cost guidance is included in the table below.
2026 Full Year Mine-by-Mine Guidance:
Operation
Silver Oz
(M)
Gold Oz
(k)
Lead Lbs
(M)
Zinc Lbs
(M)
Copper Lbs
(M)
Cash Cost
($ per AgEq Oz)
AISC
($ per AgEq Oz)
Los Gatos (70%), Mexico
4.8 – 5.4 2.9 – 3.1 34 – 38 52 – 58 1.1 – 1.3 14.88 – 15.62 18.01 – 19.04
Santa Elena, Mexico
1.3 – 1.5 64 – 71 — — — 20.04 – 21.06 24.90 – 26.40
San Dimas, Mexico
4.0 – 4.4 49 – 55 — — — 18.55 – 19.56 24.63 – 26.30
La Encantada, Mexico
2.8 – 3.1 0 — — — 24.20 – 25.52 30.54 – 32.50
Operations Total
13.0 – 14.4 116 – 129
1.1 – 1.3 $18.64 – $19.62 $23.81 – $25.31
Corporate:
($ per AgEq Oz) ($ per AgEq Oz)
Corp. G&A and Services — — — — — — 2.34 – 2.60
Total:
($ per AgEq Oz) ($ per AgEq Oz)
Total Consolidated 13.0 – 14.4 116 – 129 34 – 38 52 – 58 1.1 – 1.3 $18.64 – $19.62 $26.15 – $27.91
I. Certain amounts shown in the above table may not add exactly to the total amount due to rounding differences.
II. These measures do not have a standardized meaning under the Company’s financial reporting framework and the methods used by the Company
to calculate these measures may differ from methods used by other companies with similar descriptions. The Company calculates cash costs and
consolidated AISC in the manner set out in the table below. These measures have been calculated on a basis consistent with historical periods. See
“Non-GAAP Measures” at the end of this news release for further details regarding these measures and a reconciliation of non-GAAP to GAAP
measures.
For 2026, the Company will report cash costs and all-in sustaining costs (“AISC”) guidance on a cost per unit basis,
using a fixed gold-to-silver ratio of 75:1 with the following metal price assumptions: silver: $52.00/oz, gold:
$3,900/oz, lead: $0.90/lb., zinc: $1.35/lb., copper: $4.80/lb. The foreign currency assumption is MXN:USD 18.25:1.
The Company is projecting its 2026 consolidated AISC to be $26.15 to $27.91 on a per consolidated payable AgEq
ounce basis. Although strong silver production and higher silver prices improve overall economics, the lower AgEq
conversion ratio used in reporting reduces the number of AgEq ounces over which costs are allocated. As a result,
reported cash costs and AISC per AgEq ounce appear higher, despite stronger underlying economics. Applying the
Company’s updated 2025 guidance assumptions for metal prices and the USD/MXN exchange rate, 2026E AISC
would be approximately $23.60 per AgEq ounce, at the mid-point.
Excluding non-cash items, the Company anticipates its 2026 AISC to be within the range of $25.45 to $27.14 per
payable AgEq ounce. An itemized cost table for the AISC calculation is provided below:
7
All-In Sustaining Cost Calculation
FY 2026 ($ per AgEq oz)
Total Cash Costs per Payable Silver Ounce
18.64 – 19.62
General and Administrative Costs
1.85 – 2.05
Sustaining Development Costs
0.85 – 0.90
Sustaining Property, Plant and Equipment Costs
1.64 – 1.82
Profit Sharing
1.63 – 1.81
Lease Payments
0.84 – 0.94
Share-based Payments (non-cash)
0.50 – 0.55
Accretion and Reclamation Costs (non-cash)
0.20 – 0.22
All-In Sustaining Costs (AgEq Oz) $26.15 – $27.91
All-In Sustaining Costs: (AgEq Oz excluding non-cash items) $25.45 – $27.14
I. Certain amounts shown may not add exactly to the total amount due to rounding differences.
II. Consolidated AISC includes general and administrative cost estimates and non-cash costs of $2.55 to $2.82 per AgEq ounce.
III. AISC does not have a standardized meaning under the Company’s financial reporting framework and the methods used by the Company to
calculate AISC may differ from methods used by other companies with similar descriptions. See “Non-GAAP Measures” at the end of this news
release for further details regarding these measures and a reconciliation of non-GAAP to GAAP measures.
CAPITAL INVESTMENTS IN 2026
In 2026, the Company plans to invest between $213 million to $236 million in capital expenditures consisting of
$58 million to $66 million for sustaining activities and $154 million to $171 million for expansionary projects. This
represents an approximate 16% increase compared to the 2025 revised capital expenditure guidance of $193
million and is aligned with the Company’s future growth strategy of increasing exploration and development
activities.
Key initiatives include plant expansion at Santa Elena to 3,500 tpd, mine throughput increase at Los Gatos to 4,000
tpd, ongoing studies and early-stage mine development at the Navidad and Santo Niño discoveries, and the
acquisition of the remaining haulage fleet at La Encantada to support higher mining and throughput rates. These
investments are fully aligned with the Company’s long-term growth strategy.
Area Sustaining ($M) Expansionary ($M) Total ($M)
Underground Development 19 – 22 66 – 73 85 – 94
Exploration 0 41 – 45 41 – 45
Property, Plant and Equipment 37 – 41 34 – 38 71 – 79
Corporate Projects 2 – 3 13 – 15 16 – 18
Total $58 – $66 $154 – $171 $213 – $236
I. Certain amounts shown in this table may not add exactly to the total amount due to rounding differences.
The Company is planning approximately 266,000 m of exploration drilling in 2026, representing another year of
significant exploration after the 265,057 m of exploration drilling completed in 2025. The 2026 drilling program is
expected to consist of:
• At San Dimas, approximately 117,000 m of drilling is planned with infill, step-out and exploratory holes