Stanmore Resources Limited is an Australian mining company that produces and sells metallurgical coal, primarily for steelmaking, to global markets. The company operates three key coal-producing assets in the Bowen Basin: South Walker Creek, Poitrel, and the Isaac Plains Complex. It also holds a portfolio of growth and development projects in the region, including Eagle Downs, Lancewood, and the Isaac Downs Extension. Stanmore Resources is supported by its major shareholder, Golden Energy and Resources Pte. Ltd (GEAR).

Summarised from the company's own disclosures, fiscal year ended Dec 2025

Industry Materials Homepage stanmore.au
Sector Basic Materials IR page stanmore.au/investors
Tags
metallurgical coal, steelmaking, surface mining, coal production, exploration projects, South Walker Creek, Poitrel, Isaac Plains Complex, Eagle Downs, Lancewood, Isaac Downs Extension, Golden Energy and Resources Pte. Ltd
Press page —

Metrics

Valuation  
Market cap A$ 2.281B
Market cap (USD) $ 1.547B
P/E —
PEG —
P/BV —
P/S —
P/OCF —
P/FCF —
Dividend yield —
Turnover / mcap —
Returns  
ROE -2.7%
ROI -2.5%
ROIC -0.67%
Profit margin -2.5%
Growth  
Revenue growing No
Profits growing No
Revenue up 3y No
Revenue up 5y No
Earnings growth 3y (net profit CAGR) —
Quality  
Profitable No
Margin expanding No
Buying back stock No
Diluting (TTM) No
Debt/Equity 12.8%
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 0
Quality score -35.7%
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 AUD FY 2024 AUD FY 2023 AUD FY 2022 USD FY 2021 USD FY 2020 AUD FY 2019 AUD FY 2018 AUD FY 2017 AUD FY 2016 AUD FY 2015 AUD FY 2014 AUD FY 2013 AUD FY 2012 AUD FY 2011 AUD FY 2010 AUD
Revenue 1.881B 2.396B 2.804B 2.696B 283.3M 364.485M 403.059M 208.081M 137.846M 403.059M 0 749K 1.732M 899K 799K 101.259K
Net profit -47.2M 191.5M 472.4M 727.4M 6.8M 34.893M 91.598M 5.966M 12.035M -19.746M -12.148M -11.864M -5.011M -7.682M -2.087M -1.754M

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

Update - Dividend/Distribution - SMR Bull 0 Bear 0 Routine
Quarterly Activities Report Q3 2026 Bull 4 Bear 0 Results

uary 2026

27 October 2026

QUARTERLY ACTIVITIES REPORT

Q3 26

Operational excellence underpins cash flow generation and unlocks interim dividend “Stanmore delivered another strong operational performance in the third quarter, with South Walker Creek achieving new quarterly records for both ROM and saleable production following our deliberate prioritisation of stripping and pit preparation earlier in the year. Most importantly, these outcomes were achieved with no serious accidents during the quarter. Seaborne supply tightness continued to support market conditions during the quarter, with disruptions across key Russian and Chinese production basins driving coal prices higher. This translated to an average sales price of US$163/t in the third quarter, up 6% quarter-on-quarter; 18% higher than the same period last year on a year-to-date basis. These improved market conditions, combined with strong operational performance, supported positive cash flow during the quarter. Together with the Eagle Downs stamp duty refund, this contributed to a US$53 million reduction in net debt. At the half year, the Board prudently deferred an interim dividend to preserve balance sheet flexibility, particularly given the second-half weighting of coal sales and uncertainty surrounding the then pending Moranbah South acquisition. With a strong third quarter now delivered, improved year-to-date cash generation, supportive market conditions and robust liquidity, we are pleased to report that the Board has resolved to declare a fully franked interim dividend of 2.2 US cents per share. Looking ahead, we enter the fourth quarter with healthy ROM stocks and production tracking towards the top end of our reaffirmed full-year saleable production guidance. At the same time, we’re focused on completing the Moranbah South acquisition, a compelling opportunity to add a significant resource right next door to Eagle Downs and the Isaac Plains Complex.” Marcelo Matos, Chief Executive Officer & Executive Director

Highlights •

Run of Mine coal mined increased to 5.3Mt and saleable production reached 3.4Mt for the third quarter, supported by record quarterly production at South Walker Creek

•

Continued safety discipline, with no serious accidents recorded during the quarter and the twelve-month Serious Accident Frequency Rate steady at 0.53

•

Average sales price of US$163/t, up 6% quarter-on-quarter, reflecting improved market conditions

•

Total cash as of 30 September 2026 of US$231 million, corresponding to net debt of US$19 million (an improvement of US$53 million over the quarter) and total liquidity of US$501 million

•

Interim dividend of 2.2 US cents per share declared, supported by a cash flow positive third quarter, year-to-date cash flows, improved market conditions and strong liquidity

•

Agreement to acquire 100% of the Moranbah South tenements from Exxaro Resources for US$105 million, adding 724Mt of Measured and Indicated Coal Resources adjacent to Eagle Downs and the Isaac Plains Complex, and extinguishing up to US$60 million of deferred and contingent consideration related to the Isaac Downs Extension

1

Consolidated Production & Sales Performance1 Quarter-Ended Sep-26 Jun-26

Year-to-Date Sep-26 Sep-25

ROM Coal Mined

Mt

5.3

5.1

14.4

14.5

ROM Strip Ratio

Prime

8.5

9.1

8.7

8.7

Saleable Coal Produced

Mt

3.4

3.3

9.9

10.1

Sales of Produced Coal

Mt

3.4

3.4

9.8

10.1

Sales of Purchased Coal

Mt

0.0

0.0

0.0

0.0

Total Coal Sales

Mt

3.4

3.4

9.8

10.1

Average Sales Price

US$/t

163

154

156

132

Operational Highlights Safety Stanmore continues to demonstrate strong safety performance, with no serious accidents recorded during the quarter. The rolling 12-month Serious Accident Frequency Rate (SAFR) remained steady at 0.53 as at 30 September 2026, remaining well below the industry average2. This result reflects continued focus on managing critical risks and strengthening control effectiveness across operations. South Walker Creek Following a deliberate approach in the first half of 2026 to prioritise stripping and pit preparation, South Walker Creek delivered 2.8Mt Run of Mine (ROM) production and 1.9Mt saleable production in the third quarter, surpassing its previous quarterly ROM production record of 2.5Mt set in the December 2025 quarter. This record mining volume, together with strong CHPP performance also translated to a quarterly record for saleable production. With healthy ROM stocks heading into the fourth quarter, South Walker Creek is well-positioned to meet its saleable production Guidance for the full year, which remains unchanged. Poitrel Poitrel’s third-quarter performance reflected the planned CHPP shutdown, deferred from June and completed in July. Saleable production decreased quarter-on-quarter as CHPP feed was constrained during the shutdown, before processing rates returned to normal in August and September. ROM volumes were strong at 1.9Mt, supporting a build-up in ROM coal inventories at quarter end and positioning the operation well for the fourth quarter. Year-to-date saleable production of 3.6Mt remains on track towards the upper end of full-year Guidance. Isaac Plains Complex As previously announced, Stanmore assumed full control of mining operations at Isaac Downs during the quarter. The truck and excavator fleets delivered a strong performance, which together with an optimisation of the dragline dig methodology supported operational efficiencies, resulting in improved strip ratio, saleable production and total coal sales quarter-on-quarter.

Development and Exploration Projects Exploration Exploration expenditure was approximately A$4.9 million in the third quarter, supporting resource definition and evaluation across the portfolio. The Isaac Downs Extension 3D seismic program and the 2D seismic programs at South Walker Creek and Bee Creek concluded during the quarter.

1

Rounding may impact totals when computed in this table

2

0.84 as of 31 March 2026 as published by Resources Safety and Health Queensland for Surface Mines as at the date of this report

2

The Lancewood drilling campaign, which included chip drilling for structural data and core drilling for gas content and type sample analysis, was completed. The rigs then demobilised for scheduled maintenance before commencing drilling operations at Isaac Downs Extension. Projects During the quarter, Stanmore announced it has agreed to acquire 100% of the Moranbah South tenements from Exxaro Resources for US$105 million1. The tenements are located immediately adjacent to Eagle Downs and the Isaac Plains Complex and contain 724Mt of Measured and Indicated Coal Resources in the Goonyella Middle Seam, expected to be of premium hard coking coal quality. Completion is anticipated within the fourth quarter of 2026, conditional on Exxaro completing its acquisition of Anglo American's 50% interest in the tenements and on certain limited conditions precedent. The Eagle Downs studies continue to progress, and we intend to incorporate the Moranbah South deposit (upon completion of the transaction) into a broader study scope as a potential integrated joint development with Eagle Downs, among other options. The Isaac Downs Extension project continued to progress through the approvals process during the quarter. Detailed infrastructure design scopes were also issued for tender, positioning the project for early development once approvals are received.

Corporate Stanmore concluded the quarter with total cash of US$231 million, which, after factoring in the balance of the new term loan of US$250 million, translates to net debt2 of US$19 million. This is an improvement of US$53 million over the quarter, with cash flows supported by improved market conditions and the second-half weighted sales profile. Key non-operational cash flow items included US$22 million of capital expenditures and an initial payment of US$5 million towards the acquisition of Moranbah South. These outflows were partially offset by a refund of US$26 million received during the quarter, following Stanmore's successful objection to stamp duty paid in 2025 as part of the acquisition of the Eagle Downs project. The debt refinancing was completed during the quarter, with the new US$250 million term loan drawn and the maturity of the US$200 million revolving credit facility extended. Including available cash and undrawn debt capacity, Stanmore’s liquidity3 was US$501 million as at 30 September 2026, providing a strong platform to fund the remaining US$100 million completion payment for Moranbah South. In determining the fully franked dividend of 2.2 US cents per share (approximately US$20 million), the Board considered the Company’s year-to-date cash generation, balance sheet strength, liquidity and committed payment obligations, including the expected completion payment for Moranbah South. The Board is satisfied that the declaration of the interim dividend is consistent with Stanmore’s dividend policy and its disciplined approach to capital allocation. The timing for the payment of this dividend is as follows: a) b) c) d) e) f)

Declaration date: Ex-Dividend date: Record date: Payment date: Payment currency: Foreign exchange:

27 October 2026 30 October 2026 2 November 2026 16 November 2026 Australian Dollars Reserve Bank of Australia published AUD/USD exchange rate at 4:00pm AEDT on Record Date

Full details are contained in the Appendix 3A.1 filed with the ASX on today’s date.

1

Refer to ASX Announcement “Stanmore agrees to acquire Moranbah South” dated September 4, 2026

2

Unaudited net cash / debt is calculated as the outstanding principal balance of any long-term balance sheet debt facilities, excluding lease liabilities accounted for under IFRS-16 and finance leases, less consolidated unrestricted cash on hand, including cash in transit 3

Unaudited total liquidity includes total cash and US$270 million of available debt capacity, comprised of the undrawn US$200 million bank revolving credit facility and the undrawn US$70 million GEAR working capital facility

3

Guidance Stanmore reaffirms its 2026 full year Public Guidance, with saleable production tracking towards the top end of the Guidance range.

Metallurgical Coal Markets Concurrent shortages of coal from key Russian and Chinese production basins became the primary driver for pricing during the quarter. For China, the impacts of safety inspections and curtailment of domestic production volumes in excess of permitted limits, in combination with a reduction in clearance rates of Mongolian landborne volumes drove a supply shortage and a rapid escalation in domestic pricing. As a result, Chinese imports of seaborne coking coal increased materially during the quarter with a high premium payable for any prompt cargo availability. Concurrently, Russian exports were materially disrupted from the Black Sea terminals due to escalation of vessel strikes. These volumes were not fully replaced with exports from Baltic or Far East terminals. In addition, further economic and availability pressures from fuel and labour inputs meant Russian offered pricing for exports increased materially through the quarter. Amid this environment, delays and reduced availability were observed from key North American coal export terminals. The net effect drove FOB Australia seaborne premium coking coal pricing to a peak of US$285 per tonne in the quarter. Australian production in the quarter was strong, with favourable weather and a return to production from previously idled mines, however, producers appear to have capitalised on the very high demand from China and inventory availability in Australia is expected to be very limited. The escalation in coal and broader energy prices has placed pressure on steel margins, including within China. The direction of steel production post-holiday season in China, as well as any potential trade flow outcomes from the tariff discussions between China and the United States will be important factors in the fourth quarter. Notwithstanding that, India’s emergence from the monsoon season, together with the commissioning of new largescale Indian coke oven facilities, is expected to provide ongoing support for seaborne demand. US$ Price / Metric Tonne

350.0

Platts Premium Low Vol HCC FOB Australia Platts Low Vol PCI FOB Australia

300.0

250.0

200.0

150.0

100.0

50.0

Sep-24 Source:

Dec-24

Mar-25

Jun-25

Sep-25

Dec-25

Mar-26

Jun-26

Sep-26

S&P Global Commodity Insights Platts Premium Low Vol HCC FOB Australia and Low Vol PCI FOB Australia indices: 7-day moving average 2 September 2024 to 23 October 2026 S&P Global Commodity Insights, ©2026 by S&P Global Inc.

4

Summarised Production Statistics1

1

Quarter-Ended Sep-26 Jun-26 5.278 5.086 2.799 2.211 1.940 2.059 0.540 0.815

Year-to-Date Sep-26 Sep-25 14.368 14.512 7.227 6.849 5.179 5.119 1.962 2.544

ROM Coal Mined South Walker Creek Poitrel Isaac Plains Complex

Mt Mt Mt Mt

Strip Ratio South Walker Creek Poitrel Isaac Plains Complex

Prime Prime Prime Prime

8.5 8.5 8.8 6.8

9.1 10.2 8.1 8.3

8.7 8.7 9.0 8.3

8.7 8.4 8.5 10.1

Saleable Production South Walker Creek Poitrel Isaac Plains Complex

Mt Mt Mt Mt

3.433 1.882 1.070 0.482

3.271 1.530 1.322 0.419

9.884 5.023 3.554 1.307

10.118 4.845 3.683 1.590

Total Coal Sales South Walker Creek Poitrel Isaac Plains Complex

Mt Mt Mt Mt

3.392 1.876 1.016 0.499

3.371 1.610 1.308 0.453

9.788 4.979 3.486 1.323

10.138 4.894 3.595 1.649

Sales – Coking Coals Sales – PCI Sales – Thermal Coals

% % %

25% 70% 5%

22% 74% 4%

23% 71% 6%

24% 70% 6%

Average Sales Price

US$/t

163

154

156

132

Product Coal Stockpile South Walker Creek Poitrel Isaac Plains Complex

Mt Mt Mt Mt

0.290 0.076 0.146 0.067

0.279 0.089 0.105 0.086

0.290 0.076 0.146 0.067

0.367 0.071 0.170 0.126

ROM Coal Stockpile South Walker Creek Poitrel Isaac Plains Complex

Mt Mt Mt Mt

1.671 0.823 0.736 0.112

1.205 0.517 0.407 0.280

1.671 0.823 0.736 0.112

1.066 0.448 0.461 0.157

Rounding may impact totals when computed in this table

5

This announcement has been approved for release by the Board of Directors of Stanmore Resources Limited.

Further Information Investors

Media

[email protected]

[email protected]

We acknowledge the Traditional Owners of the land on which we work and operate: Turrbul and Jagera Country in Brisbane and Barada Barna, Widi and Jangga Country in Central Queensland. Follow us on LinkedIn.

About Stanmore Resources Limited (ASX: SMR) Stanmore Resources Limited controls and operates the South Walker Creek, Poitrel and Isaac Plains Complex metallurgical coal mines as well as the undeveloped Isaac Downs Extension, Eagle Downs and Lancewood projects in Queensland’s Bowen Basin region. Stanmore Resources holds several additional high-quality prospective coal tenements located in Queensland’s Bowen and Surat basins. The Company is focused on the creation of shareholder value via the efficient operation of its mining assets and the identification of further development opportunities within the region. More information about Stanmore can be found at stanmore.au

6

Dividend/Distribution - SMR Bull 3 Bear 0 Capital return

Appendix 3A.1 - Notification of dividend / distribution

Announcement Summary

Entity name STANMORE RESOURCES LIMITED Security on which the Distribution will be paid SMR - ORDINARY FULLY PAID Announcement Type New announcement Date of this announcement 27/10/2026 Distribution Amount USD 0.02200000 Ex Date 30/10/2026 Record Date 2/11/2026 Payment Date 16/11/2026 Refer to below for full details of the announcement

Appendix 3A.1 - Notification of dividend / distribution

1/4

Appendix 3A.1 - Notification of dividend / distribution

Announcement Details

Part 1 - Entity and announcement details

1.1 Name of +Entity STANMORE RESOURCES LIMITED 1.2 Registered Number Type

Registration Number

ACN

131920968

1.3 ASX issuer code SMR 1.4 The announcement is New announcement 1.5 Date of this announcement 27/10/2026 1.6 ASX +Security Code SMR ASX +Security Description ORDINARY FULLY PAID

Part 2A - All dividends/distributions basic details

2A.1 Type of dividend/distribution Special 2A.2 The Dividend/distribution: does not relate to a specific period within the financial year in which it was paid 2A.4 +Record Date 2/11/2026 2A.5 Ex Date 30/10/2026 2A.6 Payment Date 16/11/2026 2A.7 Are any of the below approvals required for the dividend/distribution before business day 0 of the timetable? Security holder approval Court approval Lodgement of court order with +ASIC ACCC approval FIRB approval Another approval/condition external to the entity required before business day 0 of the timetable for the dividend/distribution. Appendix 3A.1 - Notification of dividend / distribution

2/4

Appendix 3A.1 - Notification of dividend / distribution No 2A.8 Currency in which the dividend/distribution is made ("primary currency") USD - US Dollar 2A.9 Total dividend/distribution payment amount per +security (in primary currency) for all dividends/distributions notified in this form USD 0.02200000 2A.9a AUD equivalent to total dividend/distribution amount per +security AUD 2A.9b If AUD equivalent not known, date for information to be released

Estimated or Actual? Estimated

2/11/2026

2A.10 Does the entity have arrangements relating to the currency in which the dividend/distribution is paid to securityholders that it wishes to disclose to the market? No 2A.11 Does the entity have a securities plan for dividends/distributions on this +security? We do not have a securities plan for dividends/distributions on this security

2A.12 Does the +entity have tax component information apart from franking? No

Part 3B - Special dividend/distribution

3B.1 Is the special dividend/distribution estimated at this 3B.1a Special dividend/distribution estimated amount time? per +security No USD 3B.1b Special dividend/distribution amount per +security USD 0.02200000 3B.2 Is special dividend/distribution franked? Yes

3B.2a Is the special dividend/distribution fully franked? Yes

3B.3 Percentage of special dividend/distribution that is franked

3B.3a Applicable corporate tax rate for franking credit (%)

100.0000 %

30.0000 %

3B.4 Special dividend/distribution franked amount per +security

3B.5 Percentage of special dividend/distribution that is unfranked

USD 0.02200000

0.0000 %

Appendix 3A.1 - Notification of dividend / distribution

3/4

Appendix 3A.1 - Notification of dividend / distribution 3B.6 Special dividend/distribution unfranked amount per +security excluding conduit foreign income amount USD 0.00000000 3B.7 Special dividend/distribution conduit foreign income amount per +security USD 0.00000000

Part 5 - Further information

5.1 Please provide any further information applicable to this dividend/distribution Please refer to the Quarterly Activities Report for Q3 2026 release for further details announced on 27 October 2026. 5.2 Additional information for inclusion in the Announcement Summary

Appendix 3A.1 - Notification of dividend / distribution

4/4

Prompts

Stanmore Resources Limited (ticker SMR), listed in Australia.

ETFs Holding Stanmore Resources Limited

ETF Weight in ETF Shares Market value As of
AVDV 0.07% 8,296,278 $ 13.655M Nov 16, 2026
DISV 0.05% 1,368,427 $ 2.358M Nov 12, 2026
AVDS 0.02% 51,420 $ 84.631K Nov 16, 2026
DFIS 0.02% 654,950 $ 1.128M Nov 12, 2026
DXIV 0.01% 17,085 $ 29.436K Nov 12, 2026
DFIC 0.01% 550,998 $ 949.33K Nov 12, 2026
DFAI 0.00% 434,978 $ 749.436K Nov 12, 2026
DFAX 0.00% 203,764 $ 351.071K Nov 12, 2026
AVDE 0.00% 286,890 $ 472.184K Nov 16, 2026