|
St Barbara Limited is an Australian-based gold mining company focused on mineral exploration, project development, and gold mining operations. The Group's principal activities include the production and sale of gold, with a strategic focus on the Atlantic Projects in Nova Scotia, Canada, and its investment in New Simberi Gold in Papua New Guinea. Key assets include the 15-Mile Processing Hub Project, which is in the development phase, and the New Simberi Gold mine, where the company holds a significant interest following a strategic investment by Lingbao Gold Group that resulted in majority ownership transfer. The company serves the global gold market through its operations in North America and Oceania. St Barbara Limited was formerly known as St Barbara Mining. Summarised from the company's own disclosures, fiscal year ended Jun 2026 |
Industry Materials | Homepage stbarbara.com.au |
| Sector Basic Materials | IR page stbarbara.com.au/investors | |
|
Tags
gold mining, mineral exploration, project development, gold production, gold sales, New Simberi Gold, 15-Mile Processing Hub Project, Atlantic Projects, Simberi Operations, Lingbao Gold Group, Touquoy Restart, Simberi Gold Mine, Simberi Gold Company Limited, Tabar Islands Holdings Pty Ltd
|
Press page stbarbara.com.au/investors/announcements |
Metrics
| Valuation | |
|---|---|
| Market cap | A$ 864.37M |
| Market cap (USD) | $ 586.507M |
| P/E | — |
| PEG | — |
| P/BV | — |
| P/S | — |
| P/OCF | — |
| P/FCF | — |
| Dividend yield | — |
| Turnover / mcap | — |
| Returns | |
|---|---|
| ROE | 75.2% |
| ROI | 52.7% |
| ROIC | -2.0% |
| Profit margin | 13,508.4% |
| Growth | |
|---|---|
| Revenue growing | No |
| Profits growing | Yes |
| Revenue up 3y | No |
| Revenue up 5y | No |
| Earnings growth 3y (net profit CAGR) | — |
| Quality | |
|---|---|
| Profitable | Yes |
| Margin expanding | No |
| Buying back stock | No |
| Diluting (TTM) | Yes |
| Debt/Equity | 0.21% |
| Podcast bulls (TTM) | Sign up |
| Podcast bears (TTM) | Sign up |
| Podcast sentiment (TTM) | Sign up |
| Podcast sentiment % (TTM) | Sign up |
| News sentiment (TTM) | 0 |
| Quality score | 7.1% |
| Insiders | |
|---|---|
| Buys, 1w | Sign up |
| Buys, 1m | Sign up |
| Buys, 1y | Sign up |
| Sells, 1w | Sign up |
| Sells, 1m | Sign up |
| Sells, 1y | Sign up |
| Figure | FY 2026 | FY 2025 | FY 2024 | FY 2023 | FY 2022 | FY 2021 | FY 2020 | FY 2019 | FY 2018 | FY 2016 | FY 2015 | FY 2014 | FY 2013 | FY 2012 | FY 2011 | FY 2010 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenue | 3.625M | 215.521M | 197.724M | 323.852M | 680.345M | 740.247M | 827.726M | 650.321M | 679.204M | 610.115M | 548.206M | 462.77M | 511.84M | 384.396M | 359.575M | 296.76M |
| Net profit | 489.681M | -93.784M | -53.915M | -429.199M | -160.821M | -176.596M | 128.23M | 144.163M | 226.998M | 169.388M | 39.682M | -500.831M | -191.854M | 130.23M | 68.629M | -40.188M |
Podcast Mentions
Announcements lodged with ASX, newest first, routine forms (director and substantial-holding notices, daily buy-back and quotation notices) included. The link opens the announcement on ASX. Press releases from the company's own website, newest first.
5 November 2026
Ore Processing Commences at Touquoy and FY27 Guidance for Nova Scotia Highlights •
Touquoy Restart Project ore processing commenced successfully on 3 November 2026 as planned, securing approximately 200 well paid rural jobs for Nova Scotians: o
Official Re-Opening celebrated with a performance by Men of the Deeps Choir (our community benefits agreement partner) and attended by the Nova Scotia Minister for Natural Resources, the Honourable Mr Tory Rushton, and the Nova Scotia Attorney General and Minister of Justice, the Honourable Scott Armstrong, other dignitaries, representatives of community partners and our liaison groups and friends.
•
Touquoy Restart Project commissioning is expected to ramp-up to full production by end of December 2026.
•
With Touquoy Restart first ore achieved on time, St Barbara now advises the following FY27 guidance for the Nova Scotia business: o
Touquoy Restart gold production guidance of between 17,000 and 21,000 ounces, at an All-in Sustaining Costs of between A$2,070 per ounce and A$2,560 per ounce 1;
o
Growth capital expenditure for the Touquoy Restart Project and the 15-Mile Processing Hub Project of between A$40 and A$50 million subject to permitting timetable;
o
Touquoy reclamation costs of between A$24 and A$30 million; and
o
Exploration expenditure of between A$6 and A$7 million.
St Barbara Limited (“St Barbara” or the “Company”) (ASX: SBM) is pleased to announce ore processing has commenced at the Touquoy Restart Project, with first ore processed through the ball mill as planned on 3 November 2026. The Company expects ore processing will ramp up to full capacity by the end of December 2026, with first production of gold dore in January 2027. Processing of the low and medium grade stockpile material consists of transporting ore from existing stockpiles to the plant for processing. The low-grade stockpiles were previously successfully processed in Q1 September FY24 and achieved excellent recoveries of 84%. St Barbara Limited Managing Director and CEO Andrew Strelein said: “The re-commencement of ore processing through the Touquoy plant marks a significant milestone for both St Barbara and for the Province of Nova Scotia. The Province’s commitment to resource development has enabled the rapid implementation from a care and maintenance standing start to processing of the remaining low and medium grade stockpiles. The Company is pleased to be bringing back so many past employees and contractors to work at home in Nova Scotia. I congratulate St Barbara’s Nova Scotia Team for getting the Touquoy site and processing plant operational in such a short period of time, whilst also taking the opportunity to make a considerable amount of progress on the reclamation of the Touquoy mine site and tailings management facility while we have equipment on site for stockpile movement.” 1
C$1,945 to C$2,403 per ounce, at an AUD/CAD exchange rate of 0.94.
St Barbara Limited ABN 36 009 165 066 Level 19, 58 Mounts Bay Road, Perth WA 6000 PO Box 1161, West Perth WA 6872 T +61 8 9476 5555 stbarbara.com.au
ASX: SBM
The processing of first ore since 2023 and the return of Nova Scotia as a gold producing province was celebrated with a performance by Men of the Deeps Choir (our community benefits agreement partner) at the local theatre. The performance was attended by the Nova Scotia Minister for Natural Resources, the Honourable Mr Tory Rushton, and the Nova Scotia Attorney General and Minister of Justice, the Honourable Scott Armstrong, other dignitaries, representatives of community partners and our liaison groups and many other friends. With the successful commencement of ore processing on time and as budgeted, the Company is pleased to provide guidance for the key operations performance and project expenditure for FY27. Touquoy Restart Project FY27 gold production is anticipated to be between 17,000 and 21,000 ounces, at All-in Sustaining Costs of between A$2,070 per ounce and A$2,560 per ounce 1. Growth capital expenditure for both the Touquoy Restart Project and the 15-Mile Processing Hub Project is anticipated to be between A$40 and A$50 million. Touquoy site reclamation costs are expected to be between A$24 and A$30 million. There is an opportunity to cost effectively execute a significant portion of the reclamation obligation, as a dry and stable tailings management surface coincides with availability of a range of excavators and dump trucks during operations. However, the release of reclamation bond monies is not anticipated in FY27, as the completed works will need to be inspected and signed off before releases are approved. Exploration expenditure for FY27 is anticipated to be between A$6 and A$7 million, however may be increased once the Old Austen Mine Down-Plunge Mineral Resource and 15-Mile Mineral Resource diamond drilling capacity is determined.
Authorised by Andrew Strelein Managing Director and CEO
Announcement Summary
Name of entity ST BARBARA LIMITED Announcement type New announcement Date of this announcement 2/11/2026 ASX Security code and description of the class of +securities the subject of the buy-back SBM : ORDINARY FULLY PAID The type of buy-back is: On market buy-back Refer to next page for full details of the announcement
Appendix 3C - Notification of buy-back
1/5
Appendix 3C - Notification of buy-back
Part 1 - Entity and announcement details
1.1 Name of entity ST BARBARA LIMITED We (the entity named above) provide the following information about our buy-back. 1.2 Registration number type
Registration number
ACN
009165066
1.3 ASX issuer code SBM 1.4 The announcement is New announcement 1.5 Date of this announcement 2/11/2026 1.6 ASX Security code and description of the class of +securities the subject of the buy-back SBM : ORDINARY FULLY PAID
Appendix 3C - Notification of buy-back
2/5
Appendix 3C - Notification of buy-back
Part 2 - Type of buy-back
2.1 The type of buy-back is: On market buy-back
Appendix 3C - Notification of buy-back
3/5
Appendix 3C - Notification of buy-back
Part 3 - Buy-back details
Part 3A - Details of +securities, price and reason
3A.1 Total number of +securities on issue in the class of +securities to be bought back 1,226,057,431
3A.4 Does the entity intend to buy back a minimum number of +securities No 3A.5 Does the entity intend to buy back a maximum number of securities Yes 3A.5a Maximum number of securities proposed to be bought back 100,000,000 3A.6 Name of broker or brokers who will offer to buy back +securities on the entity's behalf Broker name: Argonaut Securities Pty Limited 3A.9 Are the +securities being bought back for a cash consideration? Yes 3A.9a Is the price to be paid for +securities bought back known? No 3A.9a.1 In what currency will the buy-back consideration be paid? AUD - Australian Dollar
Part 3B - Buy-back restrictions and conditions
3B.1 Does the buy-back require security holder approval? No
Appendix 3C - Notification of buy-back
4/5
Appendix 3C - Notification of buy-back
Part 3C - Key dates
On-market buy-back 3C.2 Proposed buy-back start date 23/11/2026 3C.3 Proposed buy-back end date 23/11/2027
Part 3D - Other Information
3D.1 Any other information the entity wishes to notify to ASX about the buy-back Refer ASX Announcement lodged on 2 November 2026 for further information.
Appendix 3C - Notification of buy-back
5/5
Highlights •
On-market buy-back program of up to 100 million shares approved by St Barbara Board: o
Share buy-back program to commence later this month; and
o
Shares acquired by St Barbara under the buy-back program will be cancelled.
St Barbara Limited (“St Barbara” or the “Company”) (ASX: SBM) is pleased to announce its intention to conduct an on-market share buy-back. The Board has approved an on-market buy-back of up to 100 million shares, to commence on or about 23 November 2026. St Barbara Limited Managing Director and CEO Andrew Strelein said: “Fundamentally we view St Barbara shares as continuing to be significantly undervalued. The Company’s strong balance sheet and upcoming cash flow from the Touquoy Restart creates the opportunity to concentrate ownership and future dividend payments into the hands of shareholders who share our view that St Barbara shares are significantly undervalued.” The on-market share buy-back will be conducted in accordance with the terms set out in the Appendix 3C released by the ASX today and will not require shareholder approval as the buyback will fall within the “10/12” limit of the Corporations Act (i.e. below 10% of the smallest number of votes attached to St Barbara shares at any time during the past 12 months). The share buy-back will be undertaken in the ordinary course of trading over the next 12 months, subject to the St Barbara Securities Dealing Policy including ‘Blackout Periods’. The share buy-back will be executed at St Barbara’s discretion. The exact amount of the buy-back and the timing of any trades will depend on a range of factors, including the Company’s prevailing share price, liquidity, market conditions, future capital requirements and any unanticipated circumstances that may arise during the course of the buy-back. St Barbara may vary, suspend or terminate the buy-back at any time. St Barbara will cancel any shares acquired by it under the buy-back.
Authorised by Board of Directors
St Barbara Limited ABN 36 009 165 066 Level 19, 58 Mounts Bay Road, Perth WA 6000 PO Box 1161, West Perth WA 6872 T +61 8 9476 5555 stbarbara.com.au
ASX: SBM
2 November 2026
Nova Scotia Approves Touquoy Restart, IAA of Canada Complicates 15-Mile Permitting Highlights •
•
Nova Scotia Department of Environment and Climate Change (“NSECC”) confirmed on Friday 30 October 2026 that all prerequisite steps under the Touquoy Restart Industrial Approval amendments have been met for the restart of ore processing at Touquoy: o
Mill refurbishment and tailings line construction has been completed ahead of schedule;
o
First ore processing will occur in conjunction with official re-opening ceremony on 3 November 2026;
o
Nova Scotia's permitting framework continues to deliver great clarity, efficiency and predictability for mining project development; and
o
NSECC Large Industrial File team’s timely review and approval processes are applauded by St Barbara.
The Impact Assessment Agency of Canada (“IAA of Canada”) however announced late afternoon (Halifax time) on Friday 30 October 2026 (early Saturday morning AEST) that IAA of Canada has determined that it will require a duplicative Federal Impact Assessment for the 15-Mile Processing Hub Project: o
IAA of Canada is adamant that the duplicative Federal Impact Assessment can be concluded in time for the Company’s targeted commencement of construction in mid-calendar 2028 and the Federal Government’s proposed Bill C-39 (anticipated to be passed in early 2027) seeks to legislate for a 12 month approval period for federal permits inclusive of Impact Assessment, Fisheries Act Authorisation, Species at Risk;
o
Disappointingly IAA of Canada’s decision does not reflect the recently signed Co-operation Agreement between Canada and Nova Scotia as it creates duplicative processes and less reliance on the robust Nova Scotia assessment process, despite the Canadian Governments goals of “One Project, One Review”.
•
St Barbara will be engaging with both the Canadian and Nova Scotia governments over the coming three weeks to confirm whether this decision will simply add cost, workload and confusion, or whether there is risk to the Company’s targeted timetable for the 15-Mile Processing Hub Project.
•
As a contingency, the Company has commenced planning for provincial permitting of a resumption of ore mining from the Touquoy open pit to supplement processing of stockpiled low and medium grade ore to extend gold production beyond the current scheduled calendar year 2027.
St Barbara Limited (“St Barbara” or the “Company”) (ASX: SBM) is pleased to announce that the Nova Scotia Department of Environment and Climate Change (“NSECC”) confirmed on Friday, 30 October 2026 that all prerequisite steps under the Touquoy Restart Industrial Approval amendments have been met for resumption of ore processing at Touquoy. Touquoy is now scheduled for an official re-opening on 3 November 2026. Commissioning and operations are expected to ramp up quickly over the November and December months. The Province of Nova Scotia continues to demonstrate great clarity, efficiency and predictability for resource development projects.
St Barbara Limited ABN 36 009 165 066 Level 19, 58 Mounts Bay Road, Perth WA 6000 PO Box 1161, West Perth WA 6872 T +61 8 9476 5555 stbarbara.com.au
ASX: SBM
Also on Friday, 30 October 2026 however, the Impact Assessment Agency of Canada (“IAA of Canada”) issued a determination that a Federal Impact Assessment will be required for the 15-Mile Processing Hub Project. The determination follows the IAA of Canada review process of the Initial Project Description ("IPD") and responses to the Summary of Issues for the 15-Mile Processing Hub Project. This is in stark contrast to assurances given to the Company from all levels of government that the Federal Government’s “One Project, One Review” was specifically designed to avoid duplicative permitting reviews such as this on projects like the 15-Mile Processing Hub Project. IAA of Canada officials advised St Barbara on 30 October 2026 that IAA of Canada would proceed with minimal discussions with the Province of Nova Scotia, contrary to the Co-operation Agreement 1 agreed on 27 March 2026 between the Federal Government of Canada and the Nova Scotia Provincial Government. This appears to be made in an apparent contradiction to the Federal Government’s directive on establishment of the “One Project, One Review” process for major infrastructure and resource projects. We await advice on whether the Federal Government and Provincial Government will appeal the IAA of Canada decision. IAA of Canada is adamant that the overlapping Federal Impact Assessments can be concluded in time for the Company’s targeted commencement of construction in mid-calendar 2028. The Federal Government’s proposed Bill C-39, which passed second reading on 8 October 2026 and could potentially be enacted in early 2027, also seeks to legislate a 12 month limit for review and approvals for key Federal requirements. Significant additional work however is required by the Company to fulfil the multiple parallel review steps, as mapped out indicatively in the below IAA of Canada proposed permitting timeline, but those steps should be able to completed in May 2027. Figure 1 below shows the anticipated Provincial review process in dark blue and the other existing Federal reviews are shown in light blue. These processes are reasonably predictable in timing and provided reasonable certainty of conclusion by the targeted construction date of mid-calendar 2028. The proposed timeline implied by IAA of Canada is shown in red in the chart and highlights the parallel duplicative nature of what has been determined, in contradiction to the “One Project, One Permit” policy platform.
Figure 1. IAA of Canada Proposed Permitting Timeline – 15-Mile Processing Hub Project
1
St Barbara Limited Managing Director and CEO Andrew Strelein said: “We are very excited to have the acknowledgement from NSECC that everything is in order for recommencement of ore processing at Touquoy. First ore processing will coincide with the celebration of the official re-opening on 3 November 2026. The IAA of Canada determination to require unnecessary duplicative reviews however is very disappointing for both St Barbara and the Province of Nova Scotia and appears to be a direct challenge from IAA of Canada to the Federal Government’s “One Project, One Review” policy setting. Provisions agreed in the March 2026 Co-operation Agreement between the Federal Government of Canada and Province of Nova Scotia were dismissed by IAA of Canada. St Barbara supports the proposed Bill C-39 to legislate reasonable timelines for Federal permit applications. The revised mine plans for the 15-Mile Processing Hub Project reflect years of work to redesign and incorporate feedback from First Nations and neighbouring communities to achieve an exceptional design for the collective projects to achieve dramatically improved impacts. We were anticipating a series of positive announcements this week with the maiden underground Mineral Resource Estimate of 0.5 Moz at Old Austen Mine Down-Plunge Prospect, the recommencement of ore processing at Touquoy and the confirmation of our on market share buyback, but now we must deal with this unnecessary confusion over what was meant to be “One Project, One Review” policy setting so publicly committed to across all levels of government. The St Barbara Board are in Nova Scotia this week for the official re-opening of Touquoy. We will meet with Federal and Provincial government over the coming three weeks to ensure that our Project is not getting caught up in some dispute between an uncooperative Federal regulator and the elected Federal Government’s policy directives under the “One Project, One Review”.”
Next Steps On Friday evening, St Barbara received draft Tailored Information and Studies Guidelines (“TISG”) and intends to continue engaging with IAA of Canada to establish a more reasonable and proportionate scope for the impact assessment of the 15-Mile Processing Hub Project, consistent with the objectives of the Co-operation Agreement. The Company will also continue to advance planning activities associated with the impact assessment process following the Notice of Commencement. The Company will be meeting with Federal and Provincial government over the coming three weeks, before deciding on its own next steps given the costly and complex additional workstreams added through duplicate assessments and reviews on the same subject matters. Finally the Company has commenced planning for permitting of a resumption of ore mining at Touquoy, within the existing disturbed open pit footprint, to supplement processing of stockpiled low and medium grade ore to extend gold production beyond the current scheduled calendar year 2027, as a contingency for any delay caused to the target development timeline.
Authorised by Andrew Strelein Managing Director and CEO
2 November 2026
Maiden Underground Resource of 0.5 Moz at Old Austen Mine Down-Plunge Prospect Highlights •
Underground Resource for Old Austen Mine Down-Plunge of 4.8 Mt @ 3.4 g/t Au containing 0.5 Moz of gold.
•
Nova Scotia Total Mineral Resources Estimate increased to 67.6 Mt @ 1.4 g/t Au containing 3.0 Moz of gold: o
Up 20% from previous 62.4 Mt @ 1.2 g/t Au containing 2.5 Moz of gold; and
o
Up 50% from Nova Scotia Mineral Resources Estimate position of 2.0 Moz at 30 June 2026.
St Barbara Limited (“St Barbara” or the “Company”) (ASX: SBM) is pleased to announce that the Company has defined a maiden underground Mineral Resource Estimate at Old Austen Mine Down-Plunge of 4.8 Mt @ 3.4 g/t Au containing 0.5 Moz of gold. This maiden underground Mineral Resource is entirely outside the Old Austen Mine Open Pit Mineral Resource updated and announced on 28 July 2026 1. This quantification of the maiden underground Mineral Resource Estimate at Old Austen Mine Down-Plunge follows the initial progress on priority work on the underground potential announced on 28 September 2026 2. The updated estimate incorporates mineable stope optimisation (“MSO”) constraints to define the underground resource geometry outside the previously reported Mineral Resource Estimate for the Old Austen Mine Open Pit (Table 1; Figure 1). An extensive diamond drilling campaign is being developed to infill and upgrade the portion of the underground Mineral Resource Estimate that has been classified as Inferred. Table 1. Old Austen Mine Down-Plunge Underground Mineral Resource Estimate Tonnes (Mt)
Grade (g/t Au)
Ounces (‘000)
Indicated
2.0
3.0
190
Inferred
2.8
3.7
330
Total
4.8
3.4
520
Class
St Barbara Limited Managing Director and CEO Andrew Strelein said: “The definition of a maiden underground Mineral Resource Estimate at Old Austen Mine Down-Plunge boosts our Nova Scotia Mineral Resource Estimate by 0.5 million ounces to 3.0 million ounces. This is the direct result of our Resource Geology work evaluating the underground mining potential beneath the proposed Old Austen Mine open pit. Together with the Mineral Resource Estimate increase of 0.5 million ounces announced on 28 July 2026 we have increased the total Mineral Resource inventory by an incredible 50% in the first four months of FY27. The Company is now preparing for an extensive diamond drilling campaign to infill and upgrade the Inferred component of the maiden Mineral Resource Estimate and to test for depth extensions down to the projected termination of the mineralisation at the intersection of the Mud Lake Fault significantly below current drilling.” 1
Refer to ASX announcement on 28 July 2026 titled “15-Mile Processing Hub Mineral Resources Estimate Increases 24% to 2.5 Moz
2
Refer to ASX announcement on 28 September 2026 titled “Nova Scotia Exploration Acceleration Update”
St Barbara Limited ABN 36 009 165 066 Level 19, 58 Mounts Bay Road, Perth WA 6000 PO Box 1161, West Perth WA 6872 T +61 8 9476 5555 stbarbara.com.au
ASX: SBM
Figure 1. Old Austen Mine Resource and Reserve Distinction, Nova Scotia, Canada
Next Steps St Barbara will commence an infill and extensional drill program as part of the upcoming Nova Scotia spring/summer 2027 exploration program. This drill program will target upgrading confidence levels of the Inferred component of the Mineral Resource Estimate to upgrade confidence levels and support a revised Mineral Resource Estimate. Depth extensions will also be targeted to define open mineralisation potential down to the projected termination by the Mud Lake fault significantly below current drill intercepts.
Authorised by Andrew Strelein Managing Director and CEO
Page 2 of 19
October / November 2026
Disclaimer This presentation has been prepared by St Barbara Limited (“Company”). The material contained in this presentation is summary information for general information purposes only. This presentation is not investment advice, nor is it an offer or invitation for subscription or purchase of, or a recommendation in relation to, securities in the Company and neither this presentation nor anything contained in it shall form the basis of any contract or commitment. This presentation contains forward-looking statements that are subject to risk factors associated with exploring for, developing, mining, processing, the sale of gold, trading markets and completion of acquisitions. Forward-looking statements include those containing such words as anticipate, estimates, forecasts, should, will, expects, plans, production guidance or similar expressions. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the Company, and which could cause actual results or trends to differ materially from those expressed in this presentation. Actual results may vary from the information in this presentation. The Company does not make, and this presentation should not be relied upon, any representation or warranty as to the accuracy, or reasonableness, of such statements or assumptions. Investors are cautioned not to place undue reliance on such statements. The statements, opinions, and estimates in this presentation are subject to change without notice and may be subject to rounding, as are statements about market and industry data, projections and guidance estimates. The Company undertakes no obligation to update publicly or release any revisions to these forward-looking statements. This presentation has been prepared by the Company as a summary based on information available to it, including information from third parties, and has not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. To the maximum extent permitted by law, neither the Company, their directors, employees or agents, advisers, nor any other person accepts any liability, including, without limitation, any liability arising from fault or negligence on the part of any of them or any other person, for any loss arising from the use of this presentation or its contents or otherwise arising in connection with it. Non-IFRS Measures: The Company's results are reported under the International Financial Reporting Standards (“IFRS”). This presentation includes certain non-IFRS financial measures, including cash operating costs, to provide a greater understanding of the Company operations. These measures:
- may be calculated differently by other companies and should not be used for comparison; and
- should be used in addition to, and not as a replacement for measures prepared in accordance with IFRS.
Financial figures are in Australian dollars unless otherwise noted. Financial year is 1 July to 30 June. This presentation is not audited.
Australian Securities Exchange (ASX) Listing code “SBM”
2
Disclaimer JORC Code
It is a requirement of the ASX Listing Rules that the reporting of exploration results and mineral resources in Australia comply with the 2012 edition of the Joint Ore Reserves Committee’s Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Investors outside Australia should note that while mineral resource estimates of St Barbara in this Presentation comply with the JORC Code (such JORC Code mineral resources being Mineral Resources), they may not comply with the relevant guidelines in other countries and, in particular, do not comply with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the Canadian NI 43-101 Standards); or (ii) Item 1300 of Regulation SK, which governs disclosures of mineral reserves in registration statements filed with the SEC. Information contained in this Presentation describing mineral deposits may not be comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian or US securities laws. You should not assume that quantities reported as “resources” will be converted to reserves under the JORC Code or any other reporting regime or that St Barbara will be able to legally and economically extract them. JORC Compliance statement The information in this presentation that relates to New Simberi’s Mineral Resources and Ore Reserves is extracted from the report titled ‘Q3 March FY26 Quarterly Report’ released to the ASX on 29 April 2026. Atlantic’s Mineral Resources is extracted from the report titled ‘15-Mile Processing Hub Mineral Resources Estimate Increases 24% to 2.5 Moz’ released to the ASX on 28 July 2026 and Ore Reserves is extracted from the report titled ‘15-Mile Processing Hub Project PFS Updated” released to the ASX on 28 September 2026. These reports are available to view at www.stbarbara.com.au and www.asx.com.au, and for which Competent Persons’ consents were obtained. St Barbara confirms that it is not aware of any new information or data that materially affects the information included in the Original Reports and that all material assumptions and technical parameters underpinning the Mineral Resources and Ore Reserves estimates in the Original Reports continue to apply and have not materially changed. St Barbara confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the Original Reports and that each Competent Person’s consent remains in place for subsequent releases by St Barbara of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompany consent.
3
01
Corporate Overview
5
Corporate Summary Capital Structure Shares on issue (ASX: SBM)
Shareholders3 1,226.1M
Performance rights
69.5M
Share price1
A$0.79
Market capitalisation1
A$963M
Cash2
A$416M
Debt
Nil
Hedging
Nil
Equity investment in Geopacific Resources (ASX:GPR) – 14.3%1
Institutional (60%) Retail (32%) Other (8%)
Broker Coverage
Substantial Shareholders
- Paradice (6.9%)
- Vanguard (5.7%)
- Baker Steel (5.2%)
A$11M
Note: 1. Based on ASX closing prices as at 26 October 2026; 2. Unaudited cash balance as at 30 September 2026, includes restricted cash of A$82 million for the Atlantic rehabilitation bond at AUD/CAD of 0.97; 3. As at 15 September 2026.
6
Simberi Sale Transaction Summary St Barbara to divest its remaining 40% interest in the New Simberi Gold Project to Lingbao Gold for A$453m cash PLUS royalties
TOTAL CONSIDERATION A$453 million cash PLUS royalties ► A$410m cash payment on completion ► A$43m repayment of St Barbara’s share of funding to New Simberi between April and signing
TRANSACTION STRUCTURE 40% sale of New Simberi ► Sale of St Barbara’s remaining 50% of Tabar Island Holdings (joint owned entity owning 80% of New Simberi and 100% of Tabar Islands ELs)
► 2.75% NSR on gold and silver from New Simberi and 1.5% NSR on the Tabar Islands ELs
► St Barbara’s share of ongoing cash calls related to New Simberi to be funded by Lingbao from signing to completion
FULLY FRANKED DIVIDENDS A$0.13 per share
CONDITIONS PRECEDENT Regulatory & shareholder
ROYALTY PORTFOLIO 2.75% & 1.5% NSR ► 2.75% NSR on 100% future gold and silver production from New Simberi ► 1.5% NSR on all future minerals from Tabar Island Exploration Licenses ► Both royalties guaranteed by Lingbao listed entity
TIMING March Quarter FY27
► Board will consider declaring a special A$0.13 per share fully franked dividend at completion
► PRC and PNG regulatory approvals
► Completion targeted for Q3 March FY27
► This would be in addition to the fully franked dividend of A$0.05 per share paid on 16 October
► SBM shareholder approval where required
► Post-completion: royalty portfolio strategic review
► Lingbao shareholder approval
► Board has also reconfirmed that an on-market share buy-back of up to 100m shares is being considered
► No material adverse event
Note: Refer to ASX announcement on 10 September 2026 titled “St Barbara to Sell Simberi Interest to Lingbao”
7
St Barbara management team
Andrew Strelein
Sara Prendergast
Phil Stephenson
Brett Ascott
Kylie Panckhurst
Roger Mustard
David Cotterell
Managing Director & CEO
Chief Financial Officer
Operations Advisor
EGM Projects & Technical Support EGM Projects and Technical Support since July 2023.
General Counsel & Company Secretary General Counsel and Company Secretary since September 2023.
EGM Exploration
GM Business Development & Investor Relations GM Business Development and Investor Relations since July 2023.
Managing Director & CEO since July 2023.
Chief Financial Officer since September 2023.
Operations Advisor since February 2025.
Highly experienced mining executive with extensive global experience in leadership roles across a number of mining jurisdictions including Australia, Indonesia, Africa and North America with Newmont, Euronimba and earlier with Normandy.
Over 20 years’ finance experience in multinational listed mining companies across a range of commodities including Nickel, Gold, Copper, Uranium and Zinc with Gold Fields, Minara Resources, Xstrata, BHP Billiton, Glencore, Downer, and Orica.
Extensive global mining experience, including PNG (Lihir and Porgera), Australia, Indonesia and North America, in senior management and executive leadership roles with Newcrest, Newmont, Barrick and Placer Dome.
Extensive experience in incorporated and unincorporated joint ventures including KCGM, Boddington, Euronimba, gold refineries and power stations.
Experience with joint ventures including KCGM.
Over 30 years of industry experience across Australia, Indonesia and West Africa in senior technical management roles covering geology, geotechnical engineering, mining engineering, business and strategic planning, project management, studies and business development.
Over 15 years’ experience as a corporate and commercial lawyer across various industries. Executed transactions and supported projects in Africa, the Americas, Asia-Pacific and Europe for both public and private sector clients.
EGM Exploration since July 2023. Over 30 years of gold exploration experience across Asia-Pacific and North America in technical and senior technical management roles with Dominion Mining, Ross Mining, Auzex Resources and Oceana Gold Corporation.
25 years’ mining and global financial markets experience across geology, equities research, investor relations and business development.
02
Capital Management outlook
9
Pro forma cash position Cash build up (A$m)
Key takeaways
453
869
• Existing cash balance of A$416m to result in pro-forma cash balance of A$869m1
416
• Potential for more cash realisation following royalty portfolio strategic review
Reflects cash consideration (A$410m) and capital reimbursement (A$43m)
Current cash balance
• St Barbara to receive A$410m in upfront cash from Lingbao and A$43m capital reimbursement from expenditure on the New Simberi Gold Project from April until signing ‒ As at 31 August this was A$43m
Proceeds
Pro forma
(As at 30 September 2026)
Refer to ASX announcement on 10 September 2026 titled “Remaining New Simberi Interest to be sold to Lingbao” 1. Includes unaudited cash balance (including restricted cash) as at 30 September 2026 of A$416m, cash proceeds from the transaction (A$410m) and loan repayments from Lingbao (A$43m). Excludes listed investments.
Fully Franked Dividends • Following the transaction, St Barbara is considering full distribution of franking credits with total of A$221m to shareholders, consisting of
10
Fully franked dividend payment capacity (A$m)
159
221
A$0.13ps dividend (Expected1)
Total dividend returns
- A$0.05 per share dividend paid on 16 October
- Fully franked dividend of A$0.13 per share to be considered following completion of the transaction
Potential share buy-back of up to 100m shares on issue being considered by the Board
61
A$0.05ps dividend (Paid on 16 October 2026)
Notes. 1,226 million shares on issues as at 30 September 2026. 1. Fully franked dividend to be considered by the St Barbara Board following completion of the transaction
03
Business overview
12
Overview of Nova Scotia Projects Integrated Operation with 15-Mile Processing Hub Project
Nova Scotia Projects comprise: Touquoy Restart:
1
• To produce gold from the processing of existing stockpiles through the existing Touquoy processing plant
15-Mile Mine:
2a
2b
• Four simple low strip ratio open pits (Egerton-Maclean, Plenty, Hudson & 149) providing baseline feed to the relocated Touquoy mill
Old Mitchell Mine: • Redesigned as a satellite deposit with ore mining and haulage ~72 km to 15Mile commencing in year 3
Old Austen Mine:
2c
• Low capital, satellite deposit introduced in year 4 of the mine plan with ore mining and haulage ~64 km to 15-Mile
13
Nova Scotia management team and key personnel Strong management team, with key personnel having years of experience in the region
Craig Hudson P. Eng Executive Vice President, Atlantic Appointed EVP Atlantic in May 2026. Formerly GM Atlantic Projects from 2024. Initial appointment with Atlantic Gold in 2017 to lead construction and commissioning of Touquoy. Over 15 years experience in gold mining sector, both internationally and in Canada. Experience with Barrick, Newmont and Ausenco specialising on project studies, consulting, commissioning and operations.
Andrew Taylor P. Eng Andrew Taylor P. Eng VP Operations
Dustin O'Leary
Vice President Operations
Manager Business Development
Appointed VP Atlantic Operations in late 2023. Formerly GM Operations from 2021 after stint as Manager Processing at Touquoy. Over 20 years of experience in the Canadian Mining Sector including with Inco/Vale in a variety of engineering, metallurgical and supervisory roles.
Appointed Manager Business Development in 2025. Formerly Manager Communications and leading government engagement. Over 20 years of experience government engagement, marketing and communications. Previously worked for the Halifax Regional Municipality as Promotions and Research Coordinator for 8 years. Awarded Queens Platinum Jubilee Medal for service to the Province of Nova Scotia.
Jennifer Adshade
Melissa Nicholson
Manager Community and First Nations
Environment Manager
Appointed Community & Indigenous Engagement Manager. Formerly with Atlantic in other senior permitting / engagement since roles 2018. Has worked as an Environmental Professional for over 15 years in Canada.
Appointed Environment Manager in 2022. With Atlantic since 2018. 13 years of environmental Contaminated Sites Assessment and Remediation experience as a 3rd party consultant. 7 years of experience in the Canadian gold mining sector
Adam Guignard Manager - Processing Appointed Manager Processing in 2021 and presently overseeing Touquoy since closure. Initial appointment with Atlantic Gold in 2017 to lead commissioning of Touquoy. 17 years of experience in the Canadian gold mining sector. Worked at seven different gold mines; commissioned five gold processing plants, including two as the lead and one as the signing authority.
Project status
Touquoy Restart
Following the New Simberi sale, St Barbara will be a Nova Scotia focused developer, with near term production at Touquoy Restart while progressing development activities at the 15-Mile Processing Hub
Touquoy Restart PFS completed Operating cash flow at US$4,000/oz anticipated at C$118m with 38koz gold production over a 13-month operation
Touquoy Restart permits approved Nova Scotia Environment and Climate Change approved amendments to Industrial Approval permit conditions
15-Mile
15-Mile Processing Hub Project updated PFS completed Long-term average gold production >100kozpa across an 13+ year mine life
Exploration pipeline bolstered Pipeline strengthened via regional EL acquisitions and prioritisation of key exploration targets
14
Upcoming Milestones
Touquoy Restart
Following the New Simberi sale, St Barbara will be a Nova Scotia focused developer, with near term production at Touquoy Restart while progressing development activities at the 15-Mile Processing Hub
Q4 CY26
Touquoy Restart production
Restart of ore processing at the Touquoy plant by end of calendar year 2026 — first ore, first cash flow from restart, and validation of the low-capital project
IAAC determination
15-Mile
15-Mile is expected to receive the Section 16 determination under the Impact Assessment Act, removing the requirement for a parallel federal impact assessment
FY27
15-Mile Processing Hub Project FS and FID Feasibility Study completion targeted for March quarter 2027, with FID in June 2027 Submission of Environmental and Social Impact Assessment trigger documents over FY26/27 in parallel with Feasibility Study
15
16
Nova Scotia Projects Timeline 15-Mile Processing Hub FID targeted by end of FY27, with production targeted to commence in FY30 FY 2027
Touquoy Restart
Dec
FY 2028 Jun
Dec
FY 2029 Jun
Dec
FY 2030 Jun
Re-commissioning mill and construction of in-pit tailings Touquoy production 15-Mile Processing Hub Environmental Impact Assessment1 Pre-Feasibility Study Update (complete)
Feasibility Study Final Investment Decision Industrial Approval & Other permits Detailed Engineering Site construction Works Commissioning/ Operations The above dates are indicative only and the Company reserves the right to vary the timeline at any time without notice, subject to the ASX Listing Rules and the Corporations Act and other applicable laws. Note: 1. Assumes consolidated Environmental Impact Assessment for 15-Mile, Old Austen Mine and Old Mitchell Mine
Dec
Jun
17
Updated PFS Highlights Updated PFS delivers a larger Ore Reserve, longer mine life and materially enhanced economics versus the January 2026 study
1.44 Moz
ORE RESERVES +17%
13 years MINE LIFE
Bigger, longer-life orebody • Ore Reserves up 17% to 1.44 Moz of contained gold • Mine life extended to 13 years on Proven & Probable Reserves only • Underpinned by an updated 2.5 Moz Mineral Resource
1,377 koz
1,098 US$/oz
1,705 A$m
LOM GOLD PRODUCED
LOM AISC
POST-TAX NPV5
Enhanced, low-cost production
81.6 %
POST-TAX IRR
Compelling economics
• LOM gold production up 203 koz to 1,377 koz recovered
• Post-tax NPV5 of A$1,705m and 81.6% IRR at US$3,000/oz gold
• Above 120 koz per annum in FY31 and FY32; 106 koz pa average
• Post-tax NPV5 of A$2,721 million and IRR of 121.4% at US$4,000/oz gold
• LOM AISC of US$1,098/oz on a low 2.8:1 strip ratio
• ~21% NPV uplift versus the January 2026 PFS • De-risked initial capital of C$289m (A$315m) • Feasibility Study accelerated to Q3 March FY27; FID targeted Q4 June FY27
Source: ASX release on 28 September 2026 titled “15-Mile Processing Hub Project PFS Updated”,. Economics are post-tax at a gold price of US$3,000/oz and C$1.00 = US$0.71 / A$1.09; initial capital to +/-25% AACE Class 4 accuracy.
18
Nova Scotia Projects – Touquoy Restart and 15-Mile Hub Nova Scotia Projects Production Nova Scotia Projects Production vs AISC1 vs AISC 1
1 1 Growth and Initial Capital (US$m) Growth Capital (US$m)
250
2,000
150
Initial Capital
Expansion Capital
133 125
98
96
100
95
96
100
104
102
107
106
105
Gold Production (koz)
1,200 75 800 50
25
19
205
1,600
112
200 All-in Sustaining costs (US$/oz)
125
150
100 74
400
19
50
FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 Touquoy Stockpiles
15-Mile
Old Mitchell
Old Austen
46
All-in Sustaining Cost (US$/oz)
FY29
FY30
FY31
Note: 1. Refer to ASX announcement on 28 September 2026 titled “15-Mile Processing Hub Project PFS Updated”; 15-Mile Processing Hub Pre-Feasibility Study uses US$3,000 gold price and CAD/USD of 0.71
FY32
FY33
19
Touquoy Restart Project Overview Project Details1 •
Nova Scotia Projects
1
Key Metrics
Touquoy Restart Study results1 outlined a near-term, low capital and low-cost restart ‒ Initial capital of C$11.4m ‒ Estimated gold production of 38koz over a 13-month period ‒ Average All-in Sustaining Cost of US$1,598/oz
Processing life
1.1 years
Total Mill Feed Tonnes
3.0 Mt
Average Mill Feed Gold Grade
0.4 g/t
Total Contained Gold
43 koz
•
Touquoy Restart opportunity provides near-term additional upside for Atlantic with minimal capital spend
•
On 13 April 2026, the NSECC approved amendments to the Industrial Approval permit conditions for the Touquoy Restart
•
On 24 April FID was approved and two major contracts signed
Total Recovered Gold
38 koz
•
Preparation for the in-pit tailings deposition system is underway and material movement activities have already commenced on the ore and waste stockpiles
Average Gold Recovery
88%
•
Touquoy Restart is anticipated to recommence ore processing by the end of calendar year 2026
Cash cost
US$1,430 – 1,630/oz
AISC
US$1,500 – 1,700/oz
Project Initial capex
US$7-9m
Project Highlights
38 koz
RECOVERED GOLD
88%
GOLD RECOVERY
US$1,598/oz Avg. AISC
- Refer to ASX announcement on 20 April 2026 titled “Updated Group Production and Cost Outlook“
15-Mile Processing Hub Project Overview
20
Nova Scotia Projects
2
Project Details1
Key Metrics
•
Total waste mined
109.2 Mt
Average Strip Ratio
2.82 w:o
Operational years
FY30 – FY42
Total Mill Feed
38.7 Mt
Average Mill Feed Grade
1.16 g/t
Average Gold Recovery
95.8%
Total contained gold
1.4 Moz
Mining costs
C$18.0/t milled
Mining Feed Transport
C$5.1/t milled
Processing costs
C$10.6/t milled
G&A costs
C$5.6/t milled
Initial capex
C$289m
Sustaining capex LOM
C$234m
•
The Updated PFS leverages the PFS completed in January 2026 with updated resource models and associated changes to mine design, pit sequencing, stockpiles and other infrastructure The updated PFS confirmed project with production over 100kozpa across a 13 year mine life ‒ 15-Mile Mine contains 4 open pits with Ore Reserves of 860koz ‒ Old Mitchell Mine contains 1 open pit with Ore Reserves of 340koz ‒ Old Austen Mine contains 1 open pit with Ore Reserves of 240koz
•
Gold is free-milling with high recovery from conventional gravity & Carbon-in-Leach (CIL) methods at relatively coarse grind size
•
Processing Hub includes 3 stage crushing, ball mill, gravity, CIL, cyanide detox with conventional tailings ‒ Reuses the majority of the Touquoy Process Plant
•
Project phases include 1) 1 year construction, 2) 13 years operation
•
Mineral Resources Estimate now expanded by 24% to 2.5Moz Au
•
Ore Reserves increased by 17% to 1.4 Moz following incorporation of expanded Mineral Resources Estimate
Note: 1. Refer to ASX announcement on 28 September 2026 titled “15-Mile Processing Hub Project PFS Updated”; 15-Mile Processing Hub Pre-Feasibility Study uses US$3,000 gold price and CAD/USD of 0.71
3
4
Nova Scotia Exploration – 15-Mile Processing Hub Exploration Pipeline
21
15-Mile Processing Hub Exploration Pipeline, Nova Scotia, Canada
• 46 exploration targets within 75 km of the proposed 15-Mile Processing Hub Project ranging from: ‒ Stage A (conceptual target) ‒ Stage B1 (drill target) ‒ Stage B2 (advance drill target) ‒ Stage C (resource definition) ‒ Stage D (Feasibility Study level) and ‒ Stage E (Mining Operation) • Q1 FY27 work programs: o surface sampling, and o geophysical surveys or reprocessing / 3D modelling
Nova Scotia Exploration - 15-Mile Processing Hub Exploration Pipeline 46 exploration targets within 75 km of the proposed 15-Mile Processing Hub Project
22
Nova Scotia Exploration – Old Austen Mine Down-Plunge Old Austen Mine Down-Plunge Prospect and along strike at the Mill Shaft West Prospect have been prioritised1
Note: 1. Refer to ASX announcement on 28 September 2026 titled “Nova Scotia Exploration Acceleration Update”
23
A Appendix
25
Nova Scotia Ore Reserves Proved
Probable
Total
Deposit
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
15-Mile Mine
23.6
1.1
860
23.6
1.1
860
Old Mitchell Mine
8.1
1.1
290
1.6
1.0
50
9.6
1.1
340
Old Austen Mine
4.1
1.3
170
1.4
1.6
70
5.5
1.3
240
Touquoy Stockpiles
3.0
0.4
40
3.0
0.4
40
Total Atlantic
15.2
1.2
500
26.6
1.2
980
41.7
1.1
1,480
Note: Gold Ore Reserves – 100% basis for Nova Scotia. Ore Reserves are extracted from the report titled “15-Mile Pre-Feasibility Study and Ore Reserve Update”. released to the ASX on 28 September 2026. 1.
Ore Reserves are based on a gold price of: US$2,000/oz for 15-Mile Mine, Old Mitchell Mine and Old Austen Mine, and US$3,000/oz for Touquoy stockpiles.
Cut-off grades: 0.3 g/t Au for 15-Mile Mine, 0.4g/t Au for Old Mitchell Mine and Old Austen Mine and 0.23g/t for Touquoy stockpiles.
Mineral Resources are reported inclusive of Ore Reserves.
Rounding may result in apparent summation differences between tonnes, grade and contained metal.
26
Nova Scotia Mineral Resources Measured
Indicated
Inferred
Total
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
30.2
1.2
1,190
5.5
1.1
200
35.7
1.2
1,390
Old Mitchell Mine
13.2
1.2
510
3.3
1.4
150
16.5
1.2
660
Old Austen Mine
4.4
1.4
190
5.2
1.4
230
0.6
1.9
40
10.2
1.4
460
Total Atlantic
17.6
1.2
700
38.7
1.3
1,570
6.1
1.2
240
62.4
1.2
2,510
Deposit 15-Mile Mine
Note: Gold Mineral Resources – 100% basis for Nova Scotia. Mineral Resource Estimates are extracted from the report titled ‘15-Mile Processing Hub Mineral Resources Estimate Increases 24% to 2.5 Moz’ released to the ASX on 28 July 2026. 1.
Mineral Resources are reported inclusive of Ore Reserves.
Cut-off Grade of 0.3 g/t Au.
All Mineral Resources are reported constrained by a US$2,500/oz pit shell.
Rounding may result in apparent summation differences between tonnes, grade and contained metal.
27
Simberi Gold Ore Reserves Proved
Probable
Total
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Simberi Oxide
4.6
1.1
160
2.1
1.1
75
6.6
1.1
235
Simberi Sulphide
5.0
2.1
330
10.3
2.1
680
15.3
2.1
1,010
Simberi Stockpile
0.8
1.3
30
0.8
1.3
30
Total Simberi
10.3
1.6
520
12.3
1.9
755
22.6
1.8
1,275
Deposit
Simberi Silver Ore Reserves Proved
Probable
Total
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Simberi Oxide
4.6
1.6
230
2.1
2.3
155
6.6
1.8
380
Simberi Sulphide
5.0
3.0
490
10.3
4.7
1,555
15.3
4.2
2,045
Total Simberi
9.6
2.3
720
12.3
4.3
1,710
21.9
3.5
2,425
Deposit
Note: Ore Reserves – 50% Attributable basis for Simberi. Ore Reserve estimates are extracted from the report titled ‘Q3 March FY26 Quarterly Report’ released to the ASX on 29 April 2026. 1.
Ore Reserves are based on a gold price of US$2,000/oz and a silver price of US$20/oz
Cut-off grades based on a $0/t net revenue, including gold and silver revenue.
Mineral Resources are reported inclusive of Ore Reserves.
Rounding may result in apparent summation differences between tonnes, grade and contained metal.
28
Simberi Gold Mineral Resources Measured
Indicated
Inferred
Total
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Simberi Oxide
6.5
1.0
210
7.5
1.2
290
1.5
0.9
45
15.4
1.1
545
Simberi Sulphide
13.7
1.4
615
35.6
1.4
1,600
2.5
1.2
95
51.7
1.4
2,310
Simberi Stockpile
0.8
1.3
30
0.8
1.3
30
Total Simberi
20.9
1.3
855
43.0
1.4
3.9
1.1
140
67.8
1.3
2,885
Deposit
1,890
Simberi Silver Mineral Resources Measured
Indicated
Inferred
Total
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Simberi Oxide
6.5
2.2
460
7.5
4.1
985
1.5
2.4
115
15.4
3.2
1,560
Simberi Sulphide
13.7
2.8
1,225
35.6
4.1
4,685
2.5
1.9
150
51.7
3.6
6,060
Total Simberi
20.2
2.6
1,685
43.0
4.1
5,670
3.9
2.1
265
67.1
3.5
7,620
Deposit
Note: Mineral Resources – 50% Attributable basis for Simberi. Mineral Resource Estimates are extracted from the report titled ‘Q3 March FY26 Quarterly Report’ released to the ASX on 29 April 2026. 1.
Mineral Resources are reported inclusive of Ore Reserves.
Cut-off Grades Simberi Oxide (0.4 g/t Au), Simberi Sulphide (0.6 g/t Au)
All Mineral Resources are reported constrained by a US$2,500/oz pit shell.
Rounding may result in apparent summation differences between tonnes, grade and contained metal.
29
Q1 September FY27 3 months to 30 September 2026 (unaudited)
Highlights Nova Scotia Gold Projects Development •
The 15-Mile Processing Hub Pre-Feasibility Study Update was announced on schedule at the end of September 2026 with key highlights: o
Ore Reserves increased 17% to 1.4 Moz;
o
Life of Mine extended to 13 years and is still based solely on Proved and Probable Ore Reserves;
o
Average gold production 106 koz per annum at All-In Sustaining Costs (“AISC”) averaging US$1,098/oz (A$1,685/oz), with production above 120 koz per annum in FY31 and FY32; and
o
Initial Capital of C$289 million (A$315 million) in-line with the previous estimate of C$283 million.
•
The Feasibility Study is underway and now targeted for completion in Q3 March FY27 (previously Q4 June FY27), with the Final Investment Decision continuing to be targeted for Q4 June FY27.
•
The Touquoy Restart is on track for commencement of stockpile processing by end of Q2 December FY27.
•
Old Austen Mine Down-Plunge underground potential and Mill Shaft West prospect prioritised for assessment.
New Simberi Gold Project Development •
St Barbara announced a binding agreement to sell its remaining interest in New Simberi Gold to Lingbao Gold Group in exchange for: o
A$410 million in cash consideration;
o
A$43 million repayment of capital contributions since April 2026;
o
2.75% net smelter return royalty on 100% of future gold and silver production from New Simberi; and
o
1.5% net smelter return royalty on 100% of future minerals production from the Tabar Island Group exploration licences.
•
Completion of the sale of the remaining interest is targeted for the Q3 March FY27.
•
New Simberi Gold Expansion Project is proceeding with first sulphide ore processing continuing to be targeted for mid-calendar 2028.
•
New Simberi gold production (100% basis) for Q1 September FY27 was 10,746 ounces at an AISC of A$6,011 per ounce, with growth capital (100% basis) of A$67 million during the quarter.
Financial Strength •
Total cash balance was A$416 million at 30 September 2026 (excluding A$33 million attributable cash at New Simberi Gold), with another A$14 million in listed investments.
•
Fully franked ordinary dividend of $0.05 per share declared on 28 August 2026 (paid on 16 October 2026).
Page 1 of 26
St Barbara Quarterly Report / Q1 September FY27
St Barbara Managing Director and CEO Andrew Strelein said: “The September quarter has seen substantial progress across our growth projects. At Nova Scotia, the Touquoy Restart remains on track, with mill refurbishment progressing well and commissioning expected to begin in November. The 15Mile Processing Hub Pre-Feasibility Study Update increased Ore Reserves by 17% to 1.4 million ounces and extended the life of mine to 13 years. The Feasibility Study for the project is now underway, with a Final Investment Decision still targeted for the end of the 2027 financial year.” “At New Simberi, we announced a binding agreement to sell our remaining interest to Lingbao Gold Group for A$410 million in cash, A$43 million cash repayment of capital contributions, whilst retaining ongoing exposure via a 2.75% NSR on 100% of future gold and silver production from New Simberi and a 1.5% NSR on 100% of future minerals production from the Tabar Island Group exploration licences. The New Simberi Gold Expansion Project continues to progress, with first sulphide ore processing still targeted for mid-calendar 2028. Importantly, we remain financially strong, with no debt and proforma A$880 million in cash, gold and investments.” “The Company is committed to prudent capital discipline and, as a result, the Board declared a fully franked dividend of A$0.05 per share with the FY26 financial results on 28 August 2026. This was paid on 16 October 2026. Subject to completion of the New Simberi transaction, the Board will consider a further fully franked dividend of approximately A$0.13 per share and is also considering a decision to execute an on-market share buy-back of up to 100 million shares.” Any decision to proceed with a buy-back and/or dividend and the timing and parameters proposed would depend on market conditions, the prevailing St Barbara share price, future capital requirements and other relevant considerations at that time. The Company reserves the right to vary, suspend or terminate any such proposals at any time. There is no guarantee that a decision will be made to proceed with any buy-back or dividend.
Development Projects Nova Scotia Project Development Touquoy Restart The Touquoy Restart continued to advance during the quarter with material movement, construction activities and operational preparations ramping up. Preparations are on track to be processing ore stockpiles in Q2 December FY27 with commissioning now anticipated to begin in November. Ore movement from the ore stockpiles to the ROM pad has begun, along with movement of stockpiled waste rock being placed at the tailings management facility to support the final reclamation cover design. Refurbishment of the Touquoy mill progressed well during the quarter including the installation of new mill liners, the mill motor, conveyor systems and installation of a new tent covering the crushed ore stockpile. Construction of the new in-pit tailings pipeline system was also on track. Operational readiness activities continued to progress including the hiring, onboarding and training of operations personnel to support commissioning, start-up and full operation. The ramp-up has benefited from the retention of key management personnel from the previous operations including the former General Manager, former Mill Manager, former Mine Superintendent and numerous other key roles that were retained in readiness for resumption of operations. 15-Mile Processing Hub Project Permitting activities continued to advance as the Initial Project Description (“IPD”) was accepted by the Impact Assessment Agency of Canada (“IAAC”) and the Company responded on time to the Summary of Issues issued by IAAC. The IPD encompasses the 15-Mile Processing Hub Project, including the 15-Mile mine site and the future satellite quarry-style operations at Old Austen Mine and Old Mitchell Mine. A Section 16 determination on whether a federal impact assessment is required is now awaited. As announced on 28 July 2026, St Barbara completed an updated Mineral Resource Estimate for each of the 15-Mile Processing Hub Project deposits. The updated estimate incorporates revised geological interpretations, an enhanced estimation methodology and additional historical drilling data. The Mineral Resource estimate increased by 24%, or 0.5 Moz, to 62.4 Mt @ 1.2 g/t Au containing 2.5 Moz Au, including 56.3 Mt @ 1.2 g/t Au containing 2.3 Moz Au in the Measured and Indicated categories. A Pre-Feasibility Study Update (“PFS Update”) was completed to incorporate the revised resource models and support early planning activities for the Feasibility Study. The PFS Update maintains the Page 2 of 26
St Barbara Quarterly Report / Q1 September FY27
Company’s prioritisation of environmental and social mitigation while delivering robust project economics. Ore Reserves increased by 17% to 1.4 Moz, extending the life-of-mine to 13 years with average annual gold production of approximately 106 kozpa with production above 120 kozpa in FY31 and FY32. Combined Nova Scotia Projects Outlook The anticipated timeline for the Touquoy Restart and the 15-Mile Processing Hub Project remains on track with projected dates contained in the Company’s announcement of 20 April 2026. The overall anticipated timeline is shown in Table 1. Processing of stockpiled ore at Touquoy is expected to continue into early calendar 2028 and therefore will be completed ahead of the anticipated timeline for commencement of construction of the 15-Mile Processing Hub Project. Construction of the 15-Mile Processing Hub Project is expected to commence at the end of Q4 June FY28, beginning with development of the 15-Mile mine site and continuing through to Q4 June FY29. Mining and ore haulage are expected to commence at the Old Mitchell Mine in the third year of operation, followed by the Old Austen Mine in the fourth year. The Old Mitchell Mine and Old Austen Mine deposits comprise quarry-style satellite operations with ore to be transported by road to the 15-Mile mine site for processing. The 15-Mile Processing Hub Project is anticipated to be funded from cash on hand, proceeds from the sale of the remaining interest in New Simberi Gold and from anticipated operating cash flows generated from the Touquoy Restart.
Table 1. Indicative Development Timeline for 15-Mile Processing Hub Project and Touquoy Restart
Next Steps St Barbara commenced the Feasibility Study on the 15-Mile Processing Hub Project during the quarter. The Feasibility Study is expected to be completed in Q3 March FY27 to support an anticipated FID at the end of FY27 provided permitting proceeds in line with the anticipated timeline. Studies to enable finalisation of the Environmental Assessment submission planned for Q3 March FY27 are on track. The Province of Nova Scotia continues to demonstrate support for responsible natural resource development and the commencement of processing of stockpiles at Touquoy is a result of the Province’s sensible science-based review processes. At the federal level, the Government of Canada has further reinforced support for resource development through its “one project, one review, one year” initiative and the proposed Building Canada Strong Act (Bill C-39) with the objective of reducing regulatory duplication, improving coordination between jurisdictions and accelerating review and approval timelines while maintaining environmental protections and Indigenous consultation requirements.
Page 3 of 26
St Barbara Quarterly Report / Q1 September FY27
New Simberi Gold Project Construction of the expansion of the New Simberi Gold Project is well underway. Table 2 below shows the indicative timeline with commissioning of the ball mill in Q1 September FY28 and of the flotation plant in Q4 June FY28.
Table 2. Indicative Timeline of Major Milestones for the New Simberi Gold Project
Crushing and Grinding Circuit The new 5.8 MW ball mill is now anticipated to arrive on site in November 2026. Engineering design for the grinding circuit was approximately 71% complete at the end of Q1 September FY27. The schedule for expected commissioning of the crushing and grinding circuit has slipped slightly from Q4 June FY27 to Q1 September FY28 due to delays in the commencement of piling for the plant foundations, however this has not flowed on to any delay in anticipated commencement of processing of first sulphide ore in mid-calendar 2028. The power generation units, electrical buildings and switchgear for the power station were well underway and delivery arrangements were being finalised. Flotation and Carbon-in-Leach (“CIL”) Circuit Upgrade Flotation circuit and balance of plant design work continued to progress with major componentry for the flotation circuit tendered and ordered during Q1 September FY27. Lingbao and St Barbara have accelerated the upgrade of the CIL circuit that was previously planned for FY29. This project will now proceed in parallel with the upgrade of the crushing and grinding circuit and the new flotation circuit. The recovery gains are significant and the gold price environment justifies the earlier upgrade. No delay is anticipated to the overall schedule from this acceleration. New Wharf Construction activity commenced in Q1 September FY27 and the major contractors are anticipated to be mobilised in Q2 December FY27. Site Construction Demolition work on the redundant plant was completed in readiness for the piling contractor. The civil contractor works were underway and mobilisation of the full civil equipment fleet continued. Procurement (Stages 1 and 2) was 45% complete with 60 of 132 packages approved. Stage 1 was at 68% (44 of 65 awarded packages).
Page 4 of 26
St Barbara Quarterly Report / Q1 September FY27
Safety and Sustainability During preparations for the Touquoy Restart there was a single recordable injury with the contractor workforce. Reclamation activities have resumed at Touquoy with transport of waste material to provide cover layers for the tailings management facility. The majority of the tailings management facility is now sufficiently dried and compacted for heavy traffic. Relocation of waste material for the construction of final slopes for the tailings management facility also commenced during Q1 September FY27. New Simberi Gold’s 12-month moving average Total Recordable Injury Frequency Rate (“TRIFR”) increased slightly to 0.6 per million hours worked at the end of Q1 September FY27 compared to 0.4 per million hours worked at the end of Q4 June FY26. There was one medically treated injury during the quarter that impacted the overall TRIFR. During Q1 September FY27 a further 0.44 hectares of new areas were rehabilitated at New Simberi.
Operations New Simberi Gold Project (100% basis)1 Production Summary
Q1 Sep FY26
Q2 Dec FY26
Q3 Mar FY26
Q4 Jun FY26
Year FY26
Q1 Sep FY27
kt
507
548
679
563
2,297
744
Waste mined
kt
1,639
1,941
1,558
1,905
7,043
2,828
Mined grade
g/t
0.94
0.85
0.99
1.11
0.98
1.14
Ore milled
kt
469
404
494
589
1,956
533
Milled grade
g/t
1.03
0.95
1.09
1.00
1.02
0.88
Recovery
%
72
74
78
77
75
72
Gold production
oz
11,158
9,057
13,522
14,658
48,395
10,746
Ore Mined
Operational results are reported at 100%. St Barbara's Q1 September FY27 attributable share for gold production was 50%.
New Simberi Gold production for Q1 September FY27 was 10,746 ounces (100% basis), with processed tonnes of 533 kt and an average processing feed grade of 0.88 g/t gold. Processed tonnes of 533 kt was slightly down from Q4 June FY26 with lower rainfall intermittently affecting utilisation of the ball mill owing to water supply constraints. Improvements to water collection and water management were made over the quarter to maintain water supply from the open pit collection systems. The low rainfall flows from the unprecedented El Nino weather pattern impacting PNG in recent months (and anticipated for the coming two quarters). Total mining volumes significantly improved to 3,572 kt (up 45% on Q4 June FY26). Ore mined also increased to 744 kt (up 32% on Q4 June FY26). Mining rate improvement is critically important for the achievement of design face positions for the commencement of sulphide ore processing anticipated in mid-calendar 2028. Performance improvements in the total tonnes movement came as a result of the arrival of additional trucks and excavators as scheduled in Q4 June FY26 and Q1 September FY27 combined with dry weather conditions because of the intense El Nino weather pattern. New Simberi’s gold sales for Q1 September FY27 were 9,270 ounces at an average realised price of A$6,053 per ounce.
Page 5 of 26
St Barbara Quarterly Report / Q1 September FY27
Exploration activities Canada St Barbara’s current Atlantic tenement holding comprises one mining lease (MLE 11-1) and 172 exploration licences (ELs), totalling 4,206 claims covering 68,095 hectares. A regional surface sampling program designed to test 19 priority areas is underway (Figure 2). During Q1 September FY27, 1,460 surface samples were collected comprising 1,331 till samples and 129 rock chip samples. Between May and September 2026, a combined total of 2,431 surface samples were collected comprising 2,099 till samples and 332 rock chip samples. Sampling has been undertaken at West Caledonia, Head Lakes, Rocky Lake, Mooseland North, Ferry Lake, Harrigan Cove, Touquoy Southwest, Old Austen Mine, Cochrane Hill Far West, Old Mitchell Mine, Oldham, Como Lake, Gold Lake, 15-Mile, Touquoy West HLS, Killag, West Lake and Tangier. Two UAV magnetic surveys were completed in September 2026 at 15-Mile (16 km2 for 703.8 line-km) and Old Austen Mine (21.7 km2 for 959.3 line-km). A third survey covering 11.2 km2 for 491.4 line-km, was scheduled to commence at Touquoy Mine in early October 2026. A combined Reverse Circulation, Interface Reverse Circulation and diamond drill program comprising up to 105 drill holes for 4,400 m has been designed to test between six and seven targets. Drill targets include 15-Mile, Dufferin West, Patton, Falcon, Little Meander, Lower Seal Harbour and Isaacs Harbour. The drilling program is expected to be underway in Q2 December FY27.
Old Austen Down-Plunge Prospect and Mill Shaft West Prospect As announced on 28 September 2026 1 recent quality assurance work on the significant historic drilling program has enabled an updated geological model for down-plunge from the Old Austen Mine Open Pit Ore Reserve. A high-resolution UAV magnetic survey at Old Austen Mine covering 21.7 km2 was completed in September with a comprehensive structural review scheduled to follow in H2 June FY27 to refine drill targets. Exploration targets at Old Austen Mine Down-Plunge Prospect and along strike at the Mill Shaft West Prospect have been prioritised for assessment with intention of drill testing in Q4 June FY27 to Q1 September FY28.
Australia Back Creek, New South Wales A combined 1,647 line-km UAV magnetic survey was completed in September 2026, covering the Southwest Target (1,135-line km) and Northeast Target (512-line km). The data have been processed and 3D magnetic inversion models developed, with a structural interpretation to be completed in October 2026. The survey is expected to provide additional information to support further drill targeting beneath cover in H2 FY27.
1 Refer to ASX release on 28 September 2026 titled “Nova Scotia Exploration Acceleration Update” Page 6 of 26
St Barbara Quarterly Report / Q1 September FY27
Figure 1. Q1 FY27 Completed Work Programs, 15-Mile Hub Work, Nova Scotia
Figure 2. Q1 FY27 Completed Regional Work Programs, Nova Scotia
Page 7 of 26
St Barbara Quarterly Report / Q1 September FY27
Papua New Guinea New Simberi Exploration and Resource Definition Drilling Eight diamond exploration drill holes (SDH736 to SDH742 and SDH746), totalling 1,525.0 m were completed at Simberi Operations in PNG during Q1 September FY27 (Figure 3), as part of the FY27 resource definition and exploration drill program. All holes were drilled adjacent to or between Samat and Andora deposits. The FY26 resource definition, exploration and sterilisation drill program completed at the Simberi Operations comprised 45 drill holes (SDH683 to SDH693, SDH695, SDH697, SDH699, SDH701 to SDH705, SDH709, SDH711 to SDH735), totalling 6,325.6 m. The program included 12 Darum waste rock dump sterilisation / exploration holes for 1,529.5 m, 19 Samat exploration holes for 2,442.1 m, four Pigiput Northeast Trend resource definition holes for 994.5 m four Pigibo West resource definition holes for 437.3 m, three Pigiput Southwest resource definition holes for 535.8 m, and three Northeast Andora exploration holes for 386.4 m. Assay results were received during the quarter for the final seven diamond drill holes completed in Q4 June FY26. Updated assay results from ALS were also received for five holes previously reported using the Simberi site laboratory in Q4 June FY26. At Pigiput Northeast (Figure 4), best results include: •
SDH730: 19 m @ 1.3 g/t Au from 2 m, 21 m @ 1.8 g/t Au from 80 m, 10 m @ 2.3 g/t Au from 112 m and 19 m @ 6.1 g/t Au from 127 m, including 1 m @ 103 g/t Au from 142 m, 1.6 m @ 39.6 g/t Au from 178 m.
The three shallower SDH730 intercepts are located within the current Pigiput sulphide Ore Reserve pit design. The intercept between 127 m and 144 m, extends up to 15 m vertically below the current pit design. The intercept between 178 m and 179.6 m is located 60 m vertically below the current pit design. Gold mineralisation is associated with moderately sericite-clay±chlorite altered, mudstone and andesite breccia containing 1 to 10 % sulphides. At Samat (Figure 5), best results include: •
SDH731: 13 m @ 3.1 g/t Au from 0 m and 49 m @ 1.4 g/t Au from 56 m; and
•
SDH732: 31 m @ 1.4 g/t Au from 25 m, 22 m @ 1.8 g/t Au from 69 m and 15 m @ 3.5 g/t Au from 129 m.
Both drill holes were located along the eastern margin of the current Samat sulphide Ore Reserve Pit design. The deeper SDH731 intercept occurs between 15 m and 65 m vertically below the pit design. The three SDH732 intercepts occur between 5 m and 40 m, 50 m and 75 m and 110 m to 120 m vertically below the current pit design. Gold mineralisation is associated with fresh sericite-silica-clay altered polymict breccia, monomict andesite breccia, and andesite containing 1 to 15 % sulphides. A total of 43 trenches (SIMTR1073 to SIMTR1115) for 3,415 m, were completed in FY26 along ML136 access tracks around Darum waste rock dump, the Pigiput, Samat and Andora deposits, and a proposed new haul road. Final results were received for the remaining six trenches (SIMTR1110 to SIMTR1115). At Samat, best results include: •
SIMTR1111: 30 m @ 0.9 g/t Au including 10 m @ 1.4 g/t Au; and
•
SIMTR1112: 15 m @ 2.7 g/t Au.
Both trenches intersected oxide mineralisation associated with strong alteration. SIMTR1111 is located between 25 m and 65 m west of, and SIMTR1112 is located between 10 m and 40 m north of, the Andora sulphide Ore Reserve pit design. Six trenches (SIMTR1116 to SIMTR1121), totalling 415 m have been completed to date in FY27 at Samat and Andora deposits with assay results pending.
Tatau and Tabar Islands Simberi’s exploration activities during Q1 September FY27 focussed on the resource definition and exploration drilling program within ML136. Four trenches (TATTR317 to TATTR320), totalling 1,075 m and 215 samples, were completed at the Warbariah gold surface geochemical target located in southwestern Tatau Island.
Page 8 of 26
St Barbara Quarterly Report / Q1 September FY27
Excavator access track and drill pad clearing commenced late in Q1 September FY27, in preparation for a Reverse Circulation drilling program of up to 10 holes for approximately 600 m. The program is planned for Q2 December FY27 to test copper-gold surface geochemical anomalies at Madurdur target on eastern Tatau Island, within EL2462 and EL609.
Figure 3. Q1 FY27 Completed Diamond Drilling and Trenching, Simberi Island
Page 9 of 26
St Barbara Quarterly Report / Q1 September FY27
Figure 4. Q1 FY27 Completed Diamond Drilling and Trenching at Pigiput, Simberi Island, Papua New Guinea
Page 10 of 26
St Barbara Quarterly Report / Q1 September FY27
Figure 5. Q1 FY27 Completed Diamond Drilling and Trenching at Samat, Simberi Island, Papua New Guinea
Page 11 of 26
St Barbara Quarterly Report / Q1 September FY27
Finance (unaudited) Gold sales for New Simberi Gold (100% basis) were 9,270 ounces in Q1 September FY27 at an average realised price of A$6,053 per ounce. St Barbara sold a further 286 ounces of gold at an average realised price of A$5,972 per ounce from ongoing off-site gold recovery work on material recovered from Touquoy refurbishment. The Company continues to have no debt and no hedging. St Barbara’s cash balance was A$416 million at 30 September 2026 (excluding A$33 million attributable cash at New Simberi Gold), with listed investments another A$14 million. Recurrent corporate costs for Q1 September FY27 were A$3 million. FY26 workforce bonuses were also paid in Q1 September FY27 including the cash equivalent payments for the three-year term long-term incentives for the Nova Scotia workforce. Growth capital expenditure for the Nova Scotia Projects in Q1 September FY27 was A$13 million. Exploration expenditure in Q1 September FY27 for Nova Scotia and Back Creek was A$1 million. Touquoy rehabilitation expenditure was A$8 million in Q1 September FY27. As noted above this is a step-up in expenditure now that the tailings management facility can accept heavy equipment traffic. New Simberi Gold growth capital expenditure (100% basis) in Q1 September FY27 was A$67 million, sustaining capital expenditure was A$1 million and exploration expenditure was A$2 million.
Cash, Gold and Investment Balance (A$M) – Q1 September FY27 St Barbara Ltd Cash Gold bullion in Safe Sub-Total Listed Investments Total
- Includes A$82M restricted cash
416* 416 14 430
New Simberi Gold Group (50% Attributable) 32 1 33 33
Total (inc. attributable) 448* 1 449 14 453
Page 12 of 26
St Barbara Quarterly Report / Q1 September FY27
Historic Quarter-on-Quarter Detailed Cash & Other Movement (A$M) St Barbara Limited Cash movements & balance A$M (unaudited) New Simberi Growth Projects
Q1 Sep FY26
Q2 Dec FY26
Q3 Mar FY26
Q4 Jun FY26
Year FY26
Q1 Sep FY27
(16)
(19)
(25)
(60)
Operations
9
14
13
37
Sustaining Capex
(1)
(1)
(2)
(2)
(3)
(2)
(4)
(11)
(13)
2
1
3
1
Care & Maintenance
(2)
(2)
(3)
(3)
(10)
Rehabilitation
(1)
(1)
(1)
(1)
(4)
(8)
(2)
(3)
(2)
(1)
(8)
(1)
Atlantic Growth Projects Operations
Exploration Corporate Costs
(3)
(3)
(2)
(3)
(11)
(9)
Working Cap. / Other Balance Sheet Items
(18)
(10)
(20)
(10)
(59)
4
Cashflows before financing costs
(35)
(28)
(41)
(21)
(125)
(26)
(13)
(13)
(35)
New Simberi Gold Financing Net Interest income/(expense)
2
3
5
3
Other Financing and Assets sales
10
58
389
457
Transaction costs
(2)
(4)
(6)
(1)
Net Movement for Period
(23)
28
(41)
354
318
(59)
Cash Balance at start of quarter
157
134
162
121
157
475
Total Cash at end of quarter
134
162
121
475
475
416
Cash available for use
47
75
38
393
393
334
87 2 3 139
87 8 170
83 5 21 147
82 475
82 475
82 416
Restricted cash Gold in Safe Gold Sales Receivable Total Cash & Gold at end of quarter
New Simberi Gold Group (Investment in Associate at 100%) Cash movements & balance A$M (unaudited) Growth Capex
Q1 Sep
Q2 Dec
Q3 Mar
Q4 Jun
Year
Q1 Sep
FY26
FY26
FY26
FY26
FY26
FY27
(22)
(22)
(67)
29
29
(18)
Operations Sustaining Capex
(1)
(1)
(1)
Exploration
(1)
(1)
(2)
Corporate Costs
(2)
(2)
(1)
Working Cap. / Other Balance Sheet Items
13
13
(1)
Cashflows before financing costs
16
16
(90)
Financing from Shareholders (inc. FX)
15
15
116
Net Movement for Period
31
31
26
Cash Balance at start of quarter
6
6
37
Total Cash at end of quarter
37
37
63
Cash available for use
37
37
63
Gold in Safe
5
5
3
Gold Sales Receivable
42
42
66
Total Cash & Gold at end of quarter
Page 13 of 26
St Barbara Quarterly Report / Q1 September FY27
St Barbara Limited and Attributable Share of New Simberi Gold Group Cash A$M
Q1 Sep
Q2 Dec
Q3 Mar
Q4 Jun
Year
Q1 Sep
(unaudited)
FY26
FY26
FY26
FY26
FY26
FY27
Attributable Total Cash
493
493
448
Attributable Gold in Safe
3
3
1
Total Attributable Cash & Gold
496
496
449
Equity Investments St Barbara’s listed investment portfolio consisted of the equity position in Geopacific Resources Limited. The value of the shareholding increased from A$13 million at the end of June 2026 to A$14 million at 30 September 2026. Company
Shares (M)
Ownership (%)
Value (A$M)
458.6
14.3
13.8*
Geopacific Resources Limited (ASX: GPR) *Based on closing share price on 30 September 2026
Authorised by Andrew Strelein Managing Director & CEO 27 October 2026
16 October 2026
2026 Notice of Annual General Meeting The 2026 Annual General Meeting (“Meeting”) of St Barbara Limited (“St Barbara” or the “Company”) (ASX:SBM) will be held in person at The Parmelia Hilton, 14 Mill Street, Perth, Western Australia at 10:00 am AWST on Thursday 19 November 2026. The 2026 Notice of Annual General Meeting and sample Proxy Form are attached, as distributed to shareholders today. Shareholders are strongly encouraged to continue to vote online before the Meeting, and to submit questions before the Meeting, as they have done for many years. Any presentations from the Chair and the Managing Director and CEO will be made available on the morning of the Annual General Meeting on the ASX website at www.asx.com.au and St Barbara’s website at www.stbarbara.com.au/AGM. Shareholders are encouraged to check St Barbara’s website at www.stbarbara.com.au/AGM and the ASX for any future updates in relation to conduct of the Meeting. To coincide with the Notice of Annual General Meeting, St Barbara Limited’s Annual Report and Corporate Governance Statement are also released today, and will be available at www.stbarbara.com.au.
Authorised by Kylie Panckhurst, General Counsel and Company Secretary
The 2026 Annual Report for St Barbara Limited (“St Barbara” or the “Company”) (ASX:SBM) is attached, as distributed to shareholders today. The Annual Report complements, and should be read in conjunction with, information contained in the Company’s corresponding Corporate Governance Statement released today and available at www.stbarbara.com.au.
Authorised by Board of Directors
16 October 2026
2026 Appendix 4G and Corporate Governance Statement St Barbara Limited (“St Barbara” or the “Company”) (ASX:SBM) submits the attached 2026 Appendix 4G and Corporate Governance Statement in accordance with ASX Listing Rules 4.7.3, 4.7.4 and 4.10.3, which reference the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations. St Barbara has reported against and has consistently complied with the 4th edition of the Corporate Governance Principles and Recommendations published in February 2019. The Corporate Governance Statement complements, and should be read in conjunction with, information contained in the Company’s corresponding Annual Report released today and available at www.stbarbara.com.au.
Authorised by Board of Directors
St Barbara Limited (“St Barbara” or the “Company”) (ASX: SBM) announces that ASX has granted the Company a waiver from ASX Listing Rule 6.23.3 (Waiver) to permit the Company to vary the exercise period and add a dividend equivalent entitlement in respect of certain performance rights, retention rights and project incentive performance rights (Affected Rights) granted under the Company's employee incentive plan (Plan), subject to the satisfaction of certain conditions including St Barbara shareholder approval. The Waiver relates to ASX Listing Rule 6.23.3, which provides that a change to an option that has the effect of reducing the exercise price, increasing the period for exercise, or increasing the number of securities received on exercise, cannot be made. The Waiver permits St Barbara, subject to St Barbara shareholder approval, to make the following amendments to the terms of the Affected Rights granted under the Plan: •
Variation of the exercise period: Under the current terms of the Plan, the Affected Rights are exercised automatically when they vest. The Waiver permits St Barbara to amend the terms of the Affected Rights so that, once vested, they may be exercised by the participant at any time during a 15-year period commencing on the grant date (Term)
•
Addition of a dividend equivalent entitlement: The Waiver also permits St Barbara to amend the terms of the Affected Rights so that, while a vested Affected Right remains unexercised and the participant remains employed by a St Barbara group company, the participant will be entitled to a dividend equivalent payment (through payroll) in respect of dividends paid on St Barbara shares. No dividend equivalent will apply before vesting or after cessation of employment.
The Waiver applies to a total of 69,478,289 Affected Rights, all of which are unvested and have a nil exercise price. No other material terms of the Affected Rights will change. In particular, the amendments will not alter the number or type of Affected Rights granted, the applicable performance conditions or service conditions, the measurement period, or the nil exercise price. The Waiver is subject to the following conditions: •
St Barbara must obtain shareholder approval for the proposed amendments to the terms of the Affected Rights in accordance with ASX Listing Rule 6.23.4.
•
Full details of the proposed changes to the exercise period and dividend equivalent entitlement of the Affected Rights must be disclosed in the notice of meeting seeking shareholder approval, such that shareholders can make an informed assessment of whether or not to approve the amendments.
The Plan was last approved by shareholders at St Barbara's annual general meeting held on 20 November 2025. Following a review of the Plan by an independent remuneration adviser, the Company identified that the automatic exercise mechanism in the Plan inadvertently incentivises participants to dispose of equity at vesting because: •
the Affected Rights are deemed exercised automatically when they vest; and
•
the automatic exercise on vesting generally triggers a taxing point, which often results in participants needing to sell the resulting shares in order to settle tax liabilities.
St Barbara Limited ABN 36 009 165 066 Level 19, 58 Mounts Bay Road, Perth WA 6000 PO Box 1161, West Perth WA 6872 T +61 8 9476 5555 stbarbara.com.au
ASX: SBM
The Plan is therefore not achieving its intended objective of aligning the interests of employees with those of shareholders. The proposed variation to the exercise period will allow participants to elect when to exercise their vested Affected Rights within the 15-year Term, removing the automatic taxing point at vesting and thereby reducing the incentive to dispose of shares to meet tax liabilities. The dividend equivalent entitlement is a necessary complement to the extended exercise period. Without it, participants who defer exercise to manage their tax position would forgo dividends paid during the deferral period, creating a countervailing incentive to exercise promptly and potentially sell shares to meet the resulting tax liability. St Barbara intends to seek shareholder approval for the proposed amendments to the terms of the Affected Rights at the annual general meeting to be held on 19 November 2026. A notice of meeting containing full details of the proposed amendments will be provided to shareholders and released on the ASX Market Announcements Platform in due course.
Authorised by Kylie Panckhurst Company Secretary
Highlights •
Exploration targets at Old Austen Mine Down-Plunge Prospect and along strike at the Mill Shaft West Prospect have been prioritised for assessment with intention of drill testing in Q4 June FY27 to Q1 September FY28.
•
Two primary factors driving the prioritised assessment of down-plunge potential that might be able to be mined by underground mining extraction have been:
•
o
The Old Austen Mine Open Pit design depth has been constrained to minimise surface area disturbance and to achieve appropriate setbacks from waterways and this has left known mineralisation outside of the Open Pit Ore Reserve; and
o
Recent quality assurance work on the significant historic drilling program has enabled an updated geological model for down-plunge from the Old Austen Mine Open Pit Ore Reserve.
Significant historical intercepts confirmed for inclusion in the updated geological model for the Old Austen Mine Down-Plunge Prospect (i.e. below the Open Pit Ore Reserve depth limitations) include: o o o o o o
BD85-043: 1.84 m (true width) @ 163.7 g/t Au from 123.6 m; BD86-003: 1.89 m (true width) @ 50.1 g/t Au from 141.7 m; BD86-011: 3.20 m (true width) @ 10.3 g/t Au from 288.2 m; BD86-015: 5.23 m (true width) @ 12.5 g/t Au from 206.3 m; BD86-020: 3.70 m (true width) @ 66.1 g/t Au from 298.4 m; and BD86-053C: 12.80 m (true width) @ 3.3 g/t Au from 524.2 m.
•
A drill program is now being planned to specifically test the Old Austen Mine Down-Plunge Prospect and along strike at the Mill Shaft West Prospect.
•
High-resolution UAV magnetic survey across 22 km2 around the Old Austen Mine will be completed in early October with a comprehensive structural review scheduled to follow in H2 June FY27 to refine drill targets.
St Barbara Limited (“St Barbara” or the “Company”) (ASX: SBM) is pleased to provide this update on the acceleration of exploration across its Nova Scotia exploration portfolio, with a priority assessment of down-plunge underground mining potential below Old Austen Mine Open Pit Ore Reserve depth limitations and along strike at Mill Shaft West. St Barbara Limited Managing Director and CEO Andrew Strelein said: “The updated Mineral Resource Estimate announced in July 2026 marked a major step forward for the 15-Mile Processing Hub Project.” “We continue to accelerate our exploration across our extensive pipeline of targets and in particular wish to note that we are assessing, as a priority, the underground potential down-plunge and along strike from the Old Austen Mine Open Pit Ore Reserve limitations. We think this is an attractive opportunity for further resource growth.” “We are advancing plans for a major drill program to test these targets in the Nova Scotia spring and summer of 2027. Initial work will include a high-resolution UAV magnetic survey and comprehensive structural analysis to refine drill targets.” St Barbara Limited ABN 36 009 165 066 Level 19, 58 Mounts Bay Road, Perth WA 6000 PO Box 1161, West Perth WA 6872 T +61 8 9476 5555 stbarbara.com.au
ASX: SBM
Figure 1 below is a cross section looking west at 1,100 m E showing drilling and significant intercepts down-plunge from the Old Austen Mine Open Pit Ore Reserve. The location of the Open Pit Ore Reserve shell and the +0.3 g/t Au mineralisation envelope are shown with mineralisation open down-plunge from current drilling. Mineralisation dips 70° to the north, mainly hosted by the argillite and greywacke located in the southern over-turned limb of the anticline and partially bound to the north by the late-stage Mud Lake Fault. Drilling on cross section 1,100 m E extends up to approximately 335 m below surface and approximately 250 m down dip (or 225 m vertically) below the limits of the Open Pit Ore Reserve shell (between 110 mbs and 325 mbs). The location of the cross section is shown in the Figure 4 Long Section (page 5), which highlights high-grade ‘gram-metre’ gold contours of ≥30 gram-metres located below the Open Pit Ore Reserve shell. These contours, which include the BD86-202 intercept of 5.55 m @ 66.1 g/t Au from 298.36 m, define a semi-continuous domain with an interpreted down-plunge extent of approximately 450 m. The domain plunges approximately -40° to the east within the plane of section (looking north) and remains open down plunge.
Figure 1. Old Austen Mine Down-Plunge Prospect Cross Section (equivalent to 1,100 m E Mine Grid), Nova Scotia, Canada
Significant drill intercepts (quoted in down-hole lengths in metres) located on Cross Section 1,100 m E include: •
BD86-015: 7.79 m @ 12.5 g/t Au from 206.28 m including 1.39 m @ 13.3 g/t Au from 206.28 m, 1.09 m @ 19.53 g/t Au from 210.57 m and 1.22 m @ 47.1 g/t Au from 212.85 m;
•
BD86-020: 5.55 m @ 66.1 g/t Au from 298.36 m including 0.42 m @ 814.0 g/t Au from 298.36 m; and
•
BD85-062: 4.20 m @ 14.7 g/t Au from 138.40 m including 0.28 m @ 12.9 g/t Au from 138.4 m, 0.64 m @ 10.3 g/t Au from 140.46 m and 0.53 m @ 85.3 g/t Au from 142.04 m.
True widths for the same intercepts are presented in Table 2.
Old Austen Down-Plunge Prospect and Mill Shaft West Prospect Old Austen Down-Plunge Prospect Figure 2 below shows the local geology in relation to the location of the Old Austen Mine Open Pit Ore Reserve shell perimeter and of the +0.3 g/t Au mineralisation envelope. The Old Austen Mine Down-Plunge Prospect mineralisation is hosted in the southern limb of a north dipping overturned east - southeast striking isoclinal fold. The ore body strikes approximately 105°-285° and dips at -70° towards 15°. The mineralisation is hosted within the Moose River Formation located at the base of the Goldenville Group which consists of highly interbedded greywacke and argillite beds. The east - west striking anticline is locally offset by late-stage northwest – southeast striking late faults (i.e. the Cameron Flowage and Mud Lake Faults).
Figure 2. Old Austen Mine Down-Plunge and Mill Shaft West Geology, Nova Scotia, Canada
Page 3 of 31
Figure 3 below zooms in on the local geology surrounding the Old Austen Mine Open Pit Ore Reserve shell and of the +0.3 g/t Au mineralisation envelope. Figure 3 shows the location of the long section shown in Figure 4 and the cross section shown in Figure 1 across the Old Austen Mine Open Pit Ore Reserve shell and the Old Austen Mine DownPlunge Prospect.
Figure 3. Old Austen Mine Geology, Nova Scotia, Canada
Figure 4 below is a contoured long section of gold mineralisation in ‘gram-metres’ for all drilling at the Old Austen Mine Down-Plunge Prospect after incorporation of the most recent additional historical data set. The location of the Old Austen Mine Open Pit Ore Reserve shell is overlain and the mid-point of the most significant drill intercept for each hole is shown as a black dot. Drilling extends up to approximately 575 m below surface and approximately 460 m vertically below the limits of the Open Pit Ore Reserve shell (between 115 mbs and 575 mbs). The high-grade ‘gram-metre’ gold contours of ≥30 gram-metres located below the Open Pit Ore Reserve shell define a semicontinuous domain that is 450 m long and plunges approximately -40° to the east within the plane (looking north). Gold grade is composited assuming a cut-off grade of 1 g/t Au, a minimum width of 2 m and a maximum internal dilution of 3 m. True widths have been used in the long section and calculated based on an average dip of -70° to the north and are recorded in Table 1.
Figure 4. Old Austen Mine Down-Plunge Prospect Long Section, Nova Scotia, Canada
Significant historical drill intercepts located on the Long Section for the Old Austen Mine Down-Plunge Prospect include: •
BD85-043: 1.84 m (true width) @ 163.7 g/t Au from 123.6 m;
•
BD86-003: 1.89 m (true width) @ 50.1 g/t Au from 141.7 m;
•
BD86-011: 3.20 m (true width) @ 10.3 g/t Au from 288.2 m;
•
BD86-015: 5.23 m (true width) @ 12.5 g/t Au from 206.3 m;
•
BD86-020: 3.70 m (true width) @ 66.1 g/t Au from 298.4 m; and
•
BD86-053C: 12.80 m (true width) @ 3.3 g/t Au from 524.2 m.
Page 5 of 31
FY26 and FY27 Exploration Work Program The recent ASX release dated 5 August 2026 titled “Accelerating Nova Scotia Gold Exploration Activity” outlined deposit and near-mine geophysical surveys as well as structural studies to advance drill targeting in the brownfield environment. The accelerated work program in the region around the Old Austen Mine location includes: •
Acquisition of approximately 22 km2 of high-resolution UAV magnetic survey data, comprising approximately 980 line-kilometres, across the Old Austen Mine location and the immediate surroundings;
•
Generation of detailed magnetic images and a 3D magnetic inversion model; and
•
A detailed structural review of all diamond drilling available for the Old Austen Mine location and surrounds with the aim of completing a structural model to support drill targeting to test the potential for the Old Austen Mine Down-Plunge Prospect.
Figure 5 below shows the tenement holdings within 75 km of the proposed 15-Mile Processing Hub Project and the proximity to the Touquoy Mine (planned to restart by December 2026), 15-Mile, Old Austen Mine and Old Mitchell Mine deposits. The Old Austen Mine is located 17 km west-southwest of the planned 15-Mile Processing Hub Project. The location of the planned 22 km2 (980 line-kilometres) high-resolution UAV magnetic survey and 3D inversion modelling around the Old Austen Mine location is highlighted in purple. The UAV magnetic survey will be completed in early October with the detailed structural review to be completed early H2 June FY27.
Figure 5. 15-Mile Processing Hub Exploration Targets and Old Austen Mine Down-Plunge Prospect and Mill Shaft West Prospect Locations, Nova Scotia, Canada
Mill Shaft West Prospect Figure 6 below shows the Mill Shaft West zone, which is located west of the Old Austen Mine Open Pit Ore Reserve. The Mill Shaft West area has historical workings and past drilling targeting the western extension of the anticline. A significant intercept of BD09-153: 6 m @ 5.78 g/t Au from 175 m is reported from the western-most historical hole adjacent to a 700 m gap in both drilling and surface sampling along the anticline. Like Old Austen Mine Down-Plunge Prospect any discovery at Mill Shaft West would be an underground target and not an open pit possibility. The lack of surface geochemistry or drilling for 700 m to the west of this significant intercept presents an attractive immediate target for drill testing commencing Q4 June FY27 or Q1 September FY28. All drilling data and significant assay results from the Mill Shaft West area are outlined in Table 3.
Figure 6. Mill Shaft West Prospect, Nova Scotia, Canada
Page 7 of 31
The Old Austen Mine Down-Plunge Prospect and along strike at Mill Shaft West Prospect were already identified respectively as Stage D (Feasibility Ready) and as Stage B1 (Drill Target) as shown in Figure 7 below.
Figure 7. 15-Mile Processing Hub Exploration Pipeline, Nova Scotia, Canada
Table 1: Hole ID BD05-001* BD05-001 BD05-002 BD05-002 BD05-002* BD05-003* BD05-003 BD05-006 BD05-006* BD05-008* BD05-009* BD05-010 BD05-010 BD05-010* BD05-011 BD05-011* BD05-013* BD05-017 BD05-017 BD05-017* BD05-017 BD05-018 BD05-018* BD05-018 BD05-020* BD05-021* BD05-021 BD05-022* BD05-022 BD05-023* BD05-023 BD05-024 BD05-024* BD05-025* BD05-025 BD05-026* BD05-028*
Down-hole Composite Significant Intercepts, Old Austen Mine, Nova Scotia Easting (m)
Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
521997.15
4990425.7
133.5
-45/199.5
82
522071.23
4990413.4
133.7
-55/190
107
522089.88
4990384.9
133.2
-45/190
73.2
522254.33
4990316.1
131.2
-70/194.1
110.2
522305.1 522282.49 522318.1
4990294.1 4990298.6 4990364.7
130.9 130.8 132.3
-41.7/190 -42.2/189.1 -42.9/187.3
83 80 113
522366.03
4990345.4
134.4
-46.1/190.5
140
521969.51 521921.53
4990415.1 4990441.5
132.8 133.4
-41.8/184.1 -45/190
121 120
521949.65
4990449.5
133.9
-45/190
129
522086.8 522103.97
4990360 4990422.5
132.9 133.8
-45/185.5 -45/190
80 130
522118.22
4990404.5
132.7
-45.1/196.1
110
521973.77
4990443.6
133.8
-46.2/188.1
110
522019.78
4990410.2
134.2
-45/192.8
100
522045.09
4990411.1
133.3
-46.3/190
100
522138.97 522159.75
4990368.5 4990353.09
132.7 132.4
-45/190.4 -45/190
100 80
Mid-Point (NAD83 Z20)
Mineralised Interval
Easting (m)
Northing (m)
RL (m)
From (m)
To (m)
Interval (m)
True Width
521987.0 521984.3 522063.7 522063.0 522061.3 522086.1 522085.2 522252.3 522249.0 522301.8 522278.8 522311.1 522310.0 522309.3 522356.1 522352.9 521967.8 521918.0 521917.4 521914.7 521912.9 521943.6 521942.6 521939.5 522085.2 522095.8 522095.1 522103.1 522101.6 521967.9 521965.4 522015.6 522013.4 522038.6 522037.7 522131.6 522153.0
4990397.4 4990390.2 4990376.8 4990373.4 4990365.4 4990365.1 4990360.5 4990308.0 4990293.2 4990276.1 4990276.3 4990314.0 4990307.0 4990302.1 4990293.1 4990275.6 4990393.5 4990422.0 4990418.5 4990403.9 4990394.2 4990416.5 4990410.6 4990393.6 4990344.6 4990365.0 4990358.8 4990349.3 4990343.2 4990404.1 4990387.2 4990392.6 4990383.5 4990378.1 4990373.6 4990328.8 4990320.5
104.8 97.7 80.5 75.6 64.3 113.0 108.5 109.8 77.1 114.6 110.4 85.3 79.0 74.8 80.3 63.4 113.5 113.6 110.1 95.2 85.3 100.3 94.3 76.9 117.3 76.7 70.8 77.5 71.7 93.0 76.2 116.3 107.2 99.0 94.5 93.9 100.6
38 49 64 70 79 26 34 22 57 15 26 68 78 81 74 92 21 26 32 52 67 46 54 79 15 78 89 76 87 53 80 20 36 45 53 55 45
45 55 66 72 91 31 36 24 61 34 35 71 80 90 78 109 37 30 34 56 69 49 58 82 29 85 91 83 89 61 82 31 41 51 56 57 47
7 6 2 2 12 5 2 2 4 19 9 3 2 9 4 17 16 4 2 4 2 3 4 3 14 7 2 7 2 8 2 11 5 6 3 2 2
6.39 5.48 1.65 1.65 9.94 4.54 1.82 1.35 2.93 17.65 8.35 2.78 1.86 8.41 3.65 15.67 14.89 3.63 1.81 3.63 1.81 2.72 3.63 2.72 12.67 6.41 1.83 6.45 1.85 7.26 1.82 10.01 4.56 5.46 2.74 1.85 1.84
Composite Gold Grade (g/t Au)
Gram*Metres (True Width)
5.1 3.9 1.7 1.6 2.8 2.3 1.2 2.4 4 7.3 1.6 1.6 1.1 2.3 2.2 5.8 10.9 2 1.6 129.9 2.4 5.2 122.3 1.7 4.6 3.1 2 2.4 1.7 3.5 3 1.9 15.3 1.9 1.4 1.5 1.2
32.6 21.4 2.8 2.6 27.8 10.4 2.2 3.2 11.7 128.8 13.4 4.4 2.0 19.3 8.0 90.9 162.3 7.3 2.9 471.5 4.3 14.1 443.9 4.6 58.3 19.9 3.7 15.5 3.1 25.4 5.5 19 69.8 10.4 3.8 2.8 2.2
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
Table 1 Continued: Hole ID BD05-029* BD05-030 BD05-030* BD05-031* BD05-032* BD05-033* BD05-034 BD05-034* BD05-036 BD05-036* BD05-037* BD05-037 BD05-037 BD05-038 BD05-038* BD05-039* BD05-039 BD05-043* BD05-044* BD05-046* BD06-048* BD06-050* BD06-051 BD06-051* BD06-051 BD06-052* BD06-054* BD06-057* BD06-059* BD06-061* BD06-062* BD06-066* BD06-068* BD06-070* BD06-072
Down-hole Composite Significant Intercepts, Old Austen Mine, Nova Scotia
Easting (m)
Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
522174.26 522211.4
4990423.07 4990360.04
131.1 130.9
-45/190 -45/198
140 98
522387.60 522192.91 522127.19 522066.22
4990337.54 4990378.85 4990437.99 4990388.39
134.5 131.4 132.4 133.6
-45/194.7 -46/190 -45/192.1 -45.9/194.6
120.5 97 150.2 80
522025.33
4990440.69
134.3
-42.4/193.5
120
521947.13
4990427.87
133.8
-43.6/194
80
521920.65
4990425.05
133.6
-45.1/193.7
92
521896.26
4990431.19
134.9
-42/191
72.5
522032.39 522218.85 522247.31 522202.01 522131.70 522369.14
4990460.65 4990387.74 4990400.30 4990434.23 4990468.16 4990378.27
136.4 131.4 131.3 131.3 132.3 134.9
-45.5/190.8 -46.8/190 -45.1/192.3 -42.7/192.2 -47.2/195.2 -58.4/189.6
91.3 125.2 150 200 180.1 181
522461.94 522511.82 522410.80 522105.13 522532.90 522556.70 522417.14 522392.24 522343.07 522442.61
4990330.58 4990320.59 4990330.53 4990435.74 4990303.21 4990298.55 4990358.32 4990363.70 4990375.23 4990355.75
133.5 131.4 133.9 134.0 131.6 131.7 134.7 134.7 134.8 134.3
-43.7/188 -45.3/190.8 -43.5/190.5 -53.1/190 -46.2/188.6 -43.8/191.7 -45/190 -40.1/189.7 -45/190 -47/198
170 170 172 152 161 170 179 180 170 197
Mid-Point (NAD83 Z20)
Mineralised Interval
Easting (m)
Northing (m)
RL (m)
From (m)
To (m)
Interval (m)
True Width
522157.1 522201.0 522194.2 522372.8 522182.9 522112.0 522059.7 522054.9 522015.3 522011.3 521943.4 521939.7 521936.0 521918.0 521911.8 521893.4 521889.7 522022.5 522207.3 522227.9 522176.6 522112.5 522357.1 522356.5 522355.4 522448.3 522493.6 522400.5 522095.1 522519.1 522543.0 522401.6 522376.0 522329.4 522413.4
4990328.7 4990326.6 4990302.4 4990283.3 4990323.8 4990366.1 4990364.1 4990346.1 4990401.1 4990385.8 4990413.1 4990397.3 4990381.3 4990414.4 4990390.2 4990417.0 4990395.3 4990410.6 4990324.4 4990313.5 4990321.4 4990377.5 4990304.1 4990300.6 4990294.9 4990244.4 4990236.2 4990265.6 4990372.5 4990226.5 4990223.0 4990272.8 4990270.9 4990300.1 4990273.4
41.3 96.6 73.0 80.5 73.5 60.2 107.9 89.8 97.5 83.7 119.4 104.6 89.9 122.7 98.2 121.8 102.2 85.6 62.9 42.1 32.8 34.2 14.5 9.0 0.3 49.7 44.5 71.7 53.4 50.5 58.0 47.8 57.2 58.4 40.8
130 48 81 77 78 101 35 60 49 73 17 42 64 13 49 18 47 71 93 125 151 132 141 146 158 119 118 89 93 111 104 120 121 93 127
133 50 86 79 83 105 37 64 61 79 25 44 66 18 52 21 51 73 95 127 153 138 143 151 160 123 127 92 113 114 109 126 123 123 129
3 2 5 2 5 4 2 4 12 6 8 2 2 5 3 3 4 2 2 2 2 6 2 5 2 4 9 3 20 3 5 6 2 30 2
2.86 1.82 4.61 1.83 4.49 3.69 1.81 3.66 11.15 5.59 7.35 1.85 1.86 4.52 2.75 2.78 3.72 1.83 1.8 1.81 1.9 5.39 1.6 4.01 1.61 3.66 8.15 2.77 17.22 2.75 4.57 5.44 1.9 27.19 1.77
Composite Gold Grade (g/t Au)
Gram*Metres (True Width)
12.6 1.4 4.8 2 3.6 2.5 11.1 13.1 1.8 4.4 3.3 1.9 2.4 1.8 4.1 9.6 2.3 1.1 5.5 17.7 6.2 1.1 1.4 1.4 2.5 2.9 2.8 1.4 2.6 1.29 6.7 4 3.8 2.9 1.2
36.0 2.5 22.1 3.7 16.2 9.2 20.1 47.9 20.1 24.6 24.3 3.5 4.5 8.1 11.3 26.7 8.6 2.0 9.9 32.0 11.8 5.9 2.2 5.6 4.0 10.6 22.8 3.9 44.8 3.5 30.6 21.8 7.2 78.9 2.1
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
Table 1 Continued: Hole ID BD06-072* BD06-074* BD06-076* BD06-076 BD06-078 BD06-078* BD06-079 BD06-079* BD06-080 BD06-080* BD06-081 BD06-081* BD06-082* BD06-084* BD06-085* BD06-086* BD06-086 BD06-088* BD06-090* BD06-090 BD06-094 BD06-094* BD06-095* BD06-095 BD06-097* BD06-098* BD06-099 BD06-099 BD06-099* BD06-100* BD06-101* BD06-101 BD06-102* BD06-107* BD06-108*
Down-hole Composite Significant Intercepts, Old Austen Mine, Nova Scotia
Easting (m)
Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
522255.28 522205.82
4990447.81 4990456.97
131.7 131.3
-47/189.6 -46.4/189.6
200 209
522240.26
4990300.18
134.2
-70.8/194.5
73
522349.17
4990406.44
134.3
-50/190
209
522232.81
4990338.73
131.3
-45/191.4
100
521999.66
4990444.82
134.3
-45/190
170
522201.08 521953.78 522159.23 521905.50
4990327.48 4990472.58 4990332.39 4990480.18
132.3 133.6 132.5 130.8
-45/190 -45/194.8 -45/195.7 -41.6/190
116 161 102 153
521930.02 521926.85
4990477.80 4990459.63
132.6 133.1
-55/194.3 -45/191
170 140
521908.37
4990494.52
130.8
-41.6/188.6
186
521865.23
4990523.85
130.8
-45/196.4
197
522282.77 522291.64 522330.44
4990325.19 4990361.03 4990318.48
130.1 130.6 130.0
-45/193.6 -45/195.1 -44/198.8
101 129 101
522350.23 522333.83
4990287.24 4990334.68
130.0 130.2
-45/191.7 -45/183.6
89 122
522358.70 522377.02 522228.37
4990318.08 4990272.42 4990302.28
130.4 129.7 134.1
-45/191.5 -45/190 -45/190
120 96 86
Mid-Point (NAD83 Z20)
Mineralised Interval
Easting (m)
Northing (m)
RL (m)
From (m)
To (m)
Interval (m)
True Width
522411.6 522229.6 522185.8 522184.5 522238.7 522237.0 522333.0 522330.7 522228.0 522224.4 521988.6 521987.3 522199.6 521939.6 522153.8 521896.2 521891.6 521917.7 521918.3 521912.4 521899.5 521898.8 521839.5 521837.8 522274.6 522275.3 522321.6 522319.6 522316.7 522347.0 522331.1 522330.3 522352.8 522373.9 522225.4
4990268.6 4990325.6 4990362.5 4990356.2 4990294.1 4990287.5 4990317.3 4990304.5 4990315.5 4990298.3 4990401.0 4990396.4 4990319.5 4990420.0 4990313.4 4990429.1 4990403.7 4990431.2 4990416.7 4990387.5 4990434.5 4990429.3 4990446.2 4990441.1 4990291.6 4990301.4 4990293.0 4990287.2 4990278.4 4990272.3 4990294.4 4990280.5 4990289.8 4990256.8 4990287.6
35.3 2.9 32.8 26.5 116.3 96.9 25.0 10.5 107.0 89.2 90.4 86.0 124.1 81.3 112.7 84.7 61.8 65.7 89.2 59.5 77.2 72.6 57.3 52.9 99.0 73.8 104.0 98.1 89.0 115.6 92.9 80.7 105.1 113.8 119.4
134 176 136 146 18 35 141 154 33 56 62 68 8 74 27 67 102 79 60 103 79 87 109 116 40 72 36 45 53 20 53 72 37 21 20
137 183 140 148 20 44 143 169 35 62 64 71 15 77 29 72 106 86 64 105 83 89 111 118 53 96 39 47 65 22 57 75 40 24 22
3 7 4 2 2 9 2 15 2 6 2 3 7 3 2 5 4 7 4 2 4 2 2 2 13 24 3 2 12 2 4 3 3 3 2
2.66 6.4 3.64 1.82 1.26 5.75 1.75 13.33 1.8 5.45 1.84 2.76 6.33 2.77 1.8 4.65 3.72 5.86 3.62 1.81 3.73 1.86 1.86 1.87 12.18 22.52 2.71 1.81 10.83 1.86 3.7 2.79 2.86 2.72 1.82
Composite Gold Grade (g/t Au)
Gram*Metres (True Width)
1.7 3 7.5 1.6 8.1 2.4 1.2 2.5 1.7 2.9 2.6 2.1 6.1 1.7 7.1 4.2 3.4 3.5 15.6 23.9 1.3 3.3 2.7 2.2 2.7 1.9 2 1.2 1.6 1.7 7.4 3.6 1.7 4.3 9.7
4.5 19.2 27.3 2.9 10.2 13.8 2.1 33.3 3.1 15.8 4.8 5.8 38.6 4.7 12.8 19.5 12.6 20.5 56.5 43.3 4.8 6.1 5.0 4.1 32.9 42.8 5.4 2.2 17.3 3.2 27.4 10.0 4.9 11.7 17.7
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
Page 11 of 31
Table 1 Continued: Hole ID BD06-108 BD06-109* BD06-110* BD06-110 BD06-110 BD06-111* BD06-111 BD06-112* BD06-112 BD06-113 BD06-113 BD06-113* BD06-114 BD06-114* BD06-115 BD06-115* BD06-117* BD06-118* BD06-119* BD06-120* BD06-121* BD06-122* BD06-123* BD06-128* BD06-129 BD06-129* BD06-130* BD06-131* BD06-132* BD06-133* BD07-134* BD07-135* BD07-136* BD07-137* BD07-138*
Down-hole Composite Significant Intercepts, Old Austen Mine, Nova Scotia
Easting (m)
Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
522389.74 522264.98
4990265.05 4990303.39
129.6 130.5
-45/190 -45/190
68 80
522317.74
4990282.28
130.5
-45/198.4
80
522300.61
4990400.03
134.6
-57.3/190
200
522324.67
4990410.09
135.3
-60.6/190
224
522352.61
4990431.27
133.1
-57.2/190
230
522397.43
4990393.99
134.6
-45/190
230
522424.71 522453.10 522464.06 522493.83 522518.18 522539.77 522563.44 522554.80 522529.52
4990272.21 4990269.86 4990391.72 4990356.73 4990350.25 4990331.18 4990326.99 4990269.17 4990281.53
130.0 129.6 132.7 132.5 131.3 133.1 133.6 130.7 130.5
-45/190 -42.5/193 -45/190 -45/190 -42/192 -45/188 -45/190 -45/190 -45/190
90 81 233 197 200 189.3 191.5 102.5 110
522269.36 522148.45 522067.21 521917.71 522303.74 522356.57 522315.68 522105.99 522402.77
4990379.14 4990416.85 4990506.51 4990402.97 4990436.12 4990457.10 4990511.85 4990527.76 4990420.44
131.4 131.8 135.5 135.6 132.5 133.2 133.5 132.1 134.0
-45/190 -45/190 -45/190 -45/190 -60/188 -65/190 -65/190 -64/188 -65/190
134 122 167 65 250 310 372.5 275 275
Mid-Point (NAD83 Z20)
Mineralised Interval
Easting (m)
Northing (m)
RL (m)
From (m)
To (m)
Interval (m)
True Width
522223.3 522386.2 522263.4 522261.9 522260.0 522314.3 522311.8 522286.8 522283.3 522309.7 522309.1 522307.3 522338.8 522335.7 522379.7 522378.0 522419.5 522445.1 522439.7 522474.9 522491.2 522517.3 522546.1 522545.3 522520.7 522519.1 522255.8 522137.6 522049.3 521915.6 522281.6 522334.8 522284.6 522088.4 522385.1
4990278.5 4990245.6 4990294.7 4990286.7 4990276.3 4990272.2 4990264.8 4990326.2 4990312.0 4990327.6 4990324.2 4990314.4 4990341.9 4990316.9 4990296.6 4990287.2 4990246.7 4990236.1 4990257.5 4990252.7 4990239.1 4990235.6 4990231.3 4990216.7 4990233.2 4990222.3 4990304.7 4990357.0 4990407.7 4990391.1 4990326.8 4990353.3 4990393.9 4990433.5 4990323.2
110.3 109.8 121.7 113.5 102.9 119.9 112.2 7.1 -17.9 -12.6 -18.7 -35.5 -5.4 -40.9 35.6 26.0 105.2 97.8 -3.8 19.2 31.3 36.2 37.1 77.3 81.4 70.4 55.7 71.0 35.1 123.6 -38.1 -98.7 -110.7 -52.4 -78.1
33 23 11 20 36 12 24 146 172 168 176 194 163 200 137 151 35 44 192 154 151 136 136 73 68 83 106 85 140 15 201 252 265 206 228
35 33 14 28 42 18 28 150 182 172 178 199 168 218 143 156 37 50 194 156 153 140 138 78 71 87 108 87 144 19 207 258 281 210 240
2 10 3 8 6 6 4 4 10 4 2 5 5 18 6 5 2 6 2 2 2 4 2 5 3 4 2 2 4 4 6 6 16 4 12
1.83 9.06 2.72 7.25 5.44 5.41 3.62 3.06 7.72 3.07 1.54 3.86 4.08 14.9 5.44 4.53 1.85 5.54 1.81 1.75 1.87 3.63 1.82 4.53 2.72 3.45 1.81 1.81 3.63 3.63 4.98 4.22 11.88 3 8.49
Composite Gold Grade (g/t Au)
Gram*Metres (True Width)
1.7 3.3 33.1 3.9 9.2 6.1 1.6 19.2 2.4 1.8 1.5 2.2 3.9 2.5 1.6 6.9 2.4 2.7 2.4 1.4 3.2 3.6 1.1 19.3 1.2 3.28 2.7 3 2.9 3.8 13.9 1.5 1.3 10.5 2.2
3.1 29.9 90.0 28.3 50.0 33.0 5.8 58.8 18.5 5.5 2.3 8.5 15.9 37.3 8.7 31.3 4.4 15.0 4.3 2.5 6.0 13.1 2.0 87.4 3.3 11.3 4.9 5.4 10.5 13.8 69.2 6.3 15.4 31.5 18.7
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
Table 1 Continued:
Down-hole Composite Significant Intercepts, Old Austen Mine, Nova Scotia
Hole ID
Easting (m)
Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
BD07-139* BD07-139 BD09-140 BD09-140* BD09-140 BD09-141 BD09-141 BD09-141* BD09-141 BD09-142* BD09-143* BD09-144 BD09-144* BD09-146* BD09-148* BD09-149 BD09-149* BD09-150 BD09-150* BD09-152* BD-110-01 BD-110-01* BD-110-02* BD-110-03* BD-110-04 BD-110-04* BD-110-05* BD14-154* BD14-155 BD14-155* BD14-156* BD14-158* BD14-158 BD14-159A* BD14-159A
522257.824
4990500.994
131.6
-60/190
290
521932.9838
4990429.969
133.3
-45/190
105
521959.8282
4990431.779
133.4
-45/190
95
522075.2433 522104.7955 522348.8303
4990376.062 4990389.433 4990334.996
133.2 131.4 133.0
-45/190 -45/190 -45/190
47 83 110
521893.4822 522069.0135 522107.4706
4990554.949 4990543.006 4990475.147
130.0 136.0 133.3
-50/190 -45/190 -70/190
190.5 215 215
522427.2693
4990417.284
134.8
-62/190
260
522279.2573 522016.332
4990372.568 4990352.653
131.4 101.0
-45/190 -46/002
130.5 111.36
522015.034 522015.374 522015.309
4990349.14 4990349.332 4990349.09
100.8 100.9 100.8
-15/017 -42/017 -48/017
65.23 90.83 109.73
522016.079 521932.765 521974.608
4990349.803 4990489.746 4990443.982
100.9 132.0 133.9
-31/035 -58/192 -58/193
59.44 161 173
521979.063 522073.907
4990468.521 4990430.817
134.4 134.4
-58/192 -59/192
158 140
522025.577
4990443.78
134.3
-60/190
122
Mid-Point (NAD83 Z20)
Mineralised Interval
Easting (m)
Northing (m)
RL (m)
From (m)
To (m)
Interval (m)
True Width
522237.0 522234.0 521930.2 521928.3 521923.0 521954.5 521950.4 521948.0 521946.1 522073.7 522097.0 522341.9 522338.9 521867.9 522038.7 522093.7 522092.3 522425.3 522425.0 522262.4 522019.6 522025.1 522024.5 522025.5 522027.8 522032.0 522038.9 521919.8 521968.0 521963.9 521967.8 522062.9 522060.5 522016.6 522014.7
4990386.2 4990369.9 4990415.9 4990407.4 4990385.8 4990407.9 4990393.6 4990385.3 4990379.2 4990367.4 4990352.7 4990295.4 4990277.7 4990447.6 4990404.0 4990413.7 4990408.1 4990311.1 4990302.6 4990291.5 4990391.4 4990424.9 4990381.2 4990384.7 4990387.1 4990399.3 4990381.6 4990434.7 4990417.1 4990401.2 4990420.1 4990383.5 4990374.6 4990401.1 4990393.7
-70.6 -99.1 119.3 111.1 91.0 109.8 96.4 88.8 83.2 124.3 95.5 94.0 77.4 3.4 -1.7 -33.1 -47.5 -70.4 -86.2 57.6 64.2 36.4 93.5 69.7 62.6 52.3 79.4 43.9 86.0 60.3 52.0 51.9 37.6 56.4 44.1
222 265 18 29 61 31 52 63 71 11 51 54 77 167 197 177 192 230 248 107 50 95.6 31.4 47.2 54 70.2 39.6 94 49 81 89 88 108 83 99
245 268 22 35 63 37 56 68 77 14 53 58 84 169 199 179 195 232 250 115 57.3 99.5 37.2 49.4 56.8 73.6 49.8 112 55 84 96 96 110 88 101
23 3 4 6 2 6 4 5 6 3 2 4 7 2 2 2 3 2 2 8 7.3 3.9 5.8 2.2 2.8 3.4 10.2 18 6 3 7 8 2 5 2
17.62 2.3 3.66 5.52 1.86 5.52 3.7 4.63 5.57 2.72 1.85 3.67 6.47 1.77 1.83 1.33 2 1.48 1.49 7.49 3.56 2.05 4.98 1.09 1.41 1.77 6.35 14.66 4.74 2.39 5.61 6.34 1.59 3.91 1.57
Composite Gold Grade (g/t Au)
Gram*Metres (True Width)
2.6 3.1 1.8 2.6 1.1 2.4 3.3 5.7 1.2 1.5 1 1.4 2.8 1.9 2 1.9 1.7 1.2 1.8 3.9 6.4 12.5 5 2.9 2.5 6.2 4.2 20.9 1.9 3.9 3.8 3.1 2.8 14.7 1.6
45.8 7.1 6.6 14.4 2.0 13.2 12.2 26.4 6.7 4.1 1.9 5.1 18.1 3.4 3.7 2.5 3.4 1.8 2.7 29.2 22.8 25.6 24.9 3.2 3.5 11.0 26.7 306.4 9.0 9.3 21.3 19.7 4.5 57.5 2.5
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
Page 13 of 31
Table 1 Continued: Hole ID BD14-160 BD14-160* BD14-160 BD14-163* BD14-164* BD14-165* BD14-166 BD14-166 BD14-166* BD14-167* BD14-169* BD14-169 BD14-169 BD14-170 BD14-170* BD14-171* BD14-172* BD14-173* BD14-174* BD14-174 BD14-174 BD14-175* BD14-176 BD14-176 BD14-176 BD14-176* BD14-177* BD14-178 BD14-178* BD14-179* BD14-179 BD14-180* BD14-181* BD14-181 BD14-182
Down-hole Composite Significant Intercepts, Old Austen Mine, Nova Scotia
Easting (m)
Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
522078.58
4990454.54
134.9
-59/191
170
522133.94 522233.79 522174.94 522228.81
4990481.03 4990469.02 4990427.31 4990443.79
132.4 131.5 131.4 131.4
-61/192 -61/189 -59/190 -62/188
221 251 185 221
522180.14 522278.95
4990456.63 4990444.09
131.5 131.4
-59/192 -61/190
212 269
522263.72
4990383.67
131.4
-61/184
173
522271.56 521938.32 522275.20 522313.67
4990399.69 4990521.48 4990419.72 4990363.63
131.8 131.3 131.8 132.2
-60/194 -59/191 -60/190 -58/192
212 180.54 254 149
522028.86 522328.63
4990463.99 4990434.78
135.6 133.5
-60/190 -61/193
149 266
522128.85 522332.93
4990456.06 4990459.01
132.6 132.4
-59/190 -61/192
190.2 281
522188.56
4990496.94
131.6
-59/191
248
522337.79 522369.10
4990484.01 4990377.44
132.4 135.0
-61/190 -46/191
290 163
522316.28
4990391.48
134.7
-59/189
191
Mid-Point (NAD83 Z20)
Mineralised Interval
Easting (m)
Northing (m)
RL (m)
From (m)
To (m)
Interval (m)
True Width
522066.7 522062.9 522059.8 522112.1 522223.5 522159.8 522217.5 522215.1 522214.5 522162.4 522260.5 522259.8 522255.8 522259.0 522257.8 522252.4 521919.7 522258.9 522305.0 522304.0 522303.5 522015.8 522307.0 522305.4 522304.3 522302.4 522113.4 522304.8 522302.4 522168.8 522167.5 522309.8 522351.3 522345.1 522299.9
4990403.2 4990390.7 4990380.9 4990395.3 4990373.7 4990353.7 4990366.1 4990352.2 4990348.8 4990375.1 4990359.8 4990357.1 4990339.2 4990326.8 4990315.3 4990324.4 4990445.2 4990343.1 4990318.2 4990310.9 4990305.8 4990397.6 4990349.5 4990343.4 4990338.9 4990330.5 4990382.6 4990350.4 4990340.4 4990386.4 4990379.2 4990358.2 4990300.4 4990271.4 4990314.9
42.7 21.4 4.8 -16.2 -40.3 10.7 -12.8 -35.8 -41.3 -2.4 -21.1 -25.8 -56.2 26.7 6.9 0.5 5.8 -3.2 57.5 46.8 39.4 16.7 -25.3 -36.1 -43.8 -57.9 9.5 -50.9 -65.1 -44.3 -54.5 -106.6 49.3 19.5 -0.3
100 122 145 168 191 138 161 189 194 155 171 178 214 117 140 149 142 153 84 97 105 131 177 190 198 210 139 207 227 202 218 269 106 154 150
104 132 148 174 200 144 165 191 199 158 177 181 216 119 142 153 152 156 88 101 111 133 180 192 202 223 145 219 234 213 222 374 120 156 154
4 10 3 6 9 6 4 2 5 3 6 3 2 2 2 4 10 3 4 4 6 2 3 2 4 13 6 12 7 11 4 5 14 2 4
3.13 7.82 2.35 4.85 7.01 4.84 3.1 1.58 3.97 2.42 4.64 2.32 1.56 1.52 1.55 3.2 8.02 2.35 3.24 3.25 4.89 1.57 2.31 1.55 3.11 10.16 4.76 9.88 5.82 9.09 3.31 4.6 12.66 1.82 3.12
Composite Gold Grade (g/t Au)
Gram*Metres (True Width)
3.9 2.2 6.4 1.3 2.7 3.6 1.4 1.1 25 4.1 2.7 1.2 4.2 3.1 10.3 3.6 2.4 2.7 8.3 1.8 3.3 2.1 2.1 7.7 2 1.9 1.3 1.4 2.7 2.7 4.6 9.95 2.8 1.5 1.4
12.2 17.2 15.0 6.3 18.9 17.4 4.3 1.7 99.3 9.9 12.5 2.8 6.6 4.7 16.0 11.5 19.2 6.3 26.9 5.9 16.1 3.3 4.9 11.9 6.2 19.3 6.2 13.8 15.7 24.5 15.2 45.8 35.4 2.7 4.4
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
Table 1 Continued: Hole ID BD14-182* BD14-183 BD14-183* BD14-183 BD14-184* BD14-184 BD14-184 BD14-185 BD14-185* BD14-186* BD14-187A BD14-187A* BD14-188* BD85-001* BD85-007* BD85-009 BD85-009* BD85-015* BD85-015 BD85-016* BD85-019 BD85-019* BD85-023* BD85-025* BD85-028* BD85-033* BD85-035* BD85-036* BD85-041 BD85-041* BD85-043* BD85-043 BD85-044* BD85-051* BD85-054*
Down-hole Composite Significant Intercepts, Old Austen Mine, Nova Scotia
Easting (m)
Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
522377.87
4990426.43
133.5
-62/193
251
522289.89
4990477.92
131.3
-59/198
286
522382.38
4990451.09
134.2
-63/190
284
522418.52 522431.82
4990374.27 4990441.18
134.6 135.1
-60/188 -60/189
215 278
522373.34 522135.21 522075.13 522067.50
4990401.83 4990342.27 4990431.73 4990391.70
134.1 132.2 134.9 132.6
-60/187 -45/192 -66/189 -50/192
212 38.41 129.54 72.24
522099.97
4990428.35
133.3
-72/196
155.45
522145.44 522038.79
4990419.26 4990397.65
131.2 132.7
-61/190 -45/190
133.2 85.36
521992.08 522047.84 522029.06 521981.97 521956.72 522082.13 521930.24
4990404.62 4990470.72 4990455.05 4990467.38 4990473.26 4990466.02 4990466.96
133.0 133.1 135.3 133.8 133.3 133.9 133.3
-45/193 -50/194 -50/192 -51/194 -52/196 -64/197 -70/189
60.96 152.4 121.92 128.32 138.38 182.88 174.96
522104.96
4990449.95
133.6
-71/197
187.45
521935.02 521905.95 522040.64
4990495.60 4990480.34 4990509.45
133.4 130.5 135.4
-68/188 -50/196 -72/199
237.44 164.59 320.65
Mid-Point (NAD83 Z20)
Mineralised Interval
Easting (m)
Northing (m)
RL (m)
From (m)
To (m)
Interval (m)
True Width
522298.6 522352.9 522350.9 522349.7 522246.8 522240.9 522239.9 522367.4 522366.0 522404.3 522413.0 522412.1 522359.5 522131.7 522068.8 522062.9 522061.9 522089.3 522088.9 522136.6 522036.5 522034.6 521987.0 522031.6 522015.7 521968.7 521936.4 522065.5 521926.3 521926.0 522092.2 522090.1 521928.6 521892.7 522020.8
4990309.4 4990333.5 4990325.9 4990321.6 4990376.1 4990364.0 4990362.0 4990343.8 4990331.8 4990289.7 4990318.3 4990311.7 4990308.0 4990326.4 4990388.8 4990370.7 4990366.4 4990390.7 4990389.2 4990370.7 4990385.4 4990374.9 4990383.3 4990390.8 4990387.6 4990415.3 4990403.1 4990398.5 4990433.3 4990431.4 4990406.9 4990398.8 4990443.1 4990434.9 4990446.6
-9.7 -49.9 -63.8 -71.6 -44.3 -63.6 -66.9 -84.1 -105.4 -22.0 -86.3 -97.5 -29.4 116.0 52.3 107.4 102.4 23.4 19.5 50.6 120.3 109.6 111.6 45.3 57.1 69.4 44.7 2.4 53.7 49.6 17.0 -2.4 20.2 74.1 -33.7
161 198 214 228 201 229 233 239 261 172 248 260 177 19.7 89 29.3 38.1 115.1 119.8 93.6 15.5 25.9 27.4 115.2 100.4 82.8 110.9 147.8 85.1 89.5 123.6 144.6 123.4 72.3 180
165 210 226 230 212 231 235 241 268 177 251 265 194 26.3 97.8 36.9 41.4 118.3 121.9 95.6 19.8 39.5 33.9 124.5 107.9 85 118.9 149.9 88.1 92.7 126.3 147.5 126.6 74.9 183.4
4 12 12 2 11 2 2 2 7 5 3 5 17 6.6 8.8 7.6 3.3 3.2 2.1 2 4.3 13.6 6.5 9.3 7.5 2.2 8 2.1 3 3.2 2.7 2.9 3.2 2.6 3.4
3.13 9.07 9.15 1.53 8.74 1.6 1.6 1.5 5.35 3.84 2.31 3.86 13.36 5.98 6.77 6.67 2.91 2.16 1.42 1.65 3.9 12.33 5.95 8.41 6.7 1.93 7.04 1.62 2.15 2.3 1.84 2 2.36 2.24 2.47
Composite Gold Grade (g/t Au)
Gram*Metres (True Width)
2.9 2 2.6 1.2 1.8 1.2 1.3 4.3 1.8 2.8 1.8 1.3 2.5 11 3.3 3 14.8 2.1 1.6 3.9 3.6 4 3.5 6.1 1.9 6.5 6.4 1.3 1.4 4.4 163.7 6.6 2.8 1.9 4.3
9.1 18.1 23.8 1.8 15.7 1.9 2.1 6.5 9.6 10.8 4.2 5.0 33.4 65.8 22.3 20.0 43.1 4.5 2.3 6.4 14.0 49.3 20.8 51.3 12.7 12.5 45.1 2.1 3.0 10.1 301.2 13.2 6.6 4.3 10.6
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
Page 15 of 31
Table 1 Continued: Hole ID BD85-055* BD85-059* BD85-061* BD85-062* BD85-064* BD85-065* BD85-068* BD85-071* BD85-072* BD85-078* BD85-079* BD85-082* BD85-088* BD85-088 BD86-001* BD86-002* BD86-002 BD86-003 BD86-003* BD86-004* BD86-004 BD86-005* BD86-006* BD86-011* BD86-015* BD86-015 BD86-015 BD86-017* BD86-018* BD86-019* BD86-020* BD86-021* BD86-021 BD86-024 BD86-024*
Down-hole Composite Significant Intercepts, Old Austen Mine, Nova Scotia
Easting (m)
Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
521881.56 522292.81 522064.41 522319.05 522159.60 522183.94 522315.18 522335.53 521866.64 521781.96 522471.91 522269.93 522039.37
4990479.52 4990368.93 4990376.16 4990383.01 4990362.81 4990476.56 4990360.00 4990335.09 4990413.61 4990480.62 4990357.66 4990395.15 4990403.97
130.3 129.9 132.6 134.0 131.9 131.0 130.3 129.6 132.5 135.8 133.5 131.6 133.1
-51/199 -63/186 -60/190 -63/189 -55/192 -50/192 -64/190 -52/192 -70/190 -71/202 -46/196 -64/190 -50/186
126.49 177.7 44.5 175.56 44.5 255.12 131.68 120.09 37.49 145.08 166.48 214.88 83.84
522235.08 522283.24
4990475.96 4990468.36
130.6 130.8
-62/190 -61/190
308.76 318.52
522128.05
4990446.22
132.6
-65/192
181.97
522294.45
4990540.71
133.2
-63/190
382.83
522102.47 522295.73 522245.50 522330.47
4990439.25 4990541.10 4990539.05 4990439.31
133.9 133.5 132.2 132.0
-54/198 -73/190 -63/193 -73/194
157.58 462.99 405.08 349.27
522039.22 522019.57 522306.43 522337.40 522386.25
4990401.46 4990406.32 4990608.16 4990486.68 4990475.52
133.4 133.3 130.3 130.6 132.2
-50/188 -46/201 -70/193 -70/192 -74/191
70.1 70.83 527.3 412.4 390.75
522377.41
4990428.77
131.8
-64/190
325.91
Mid-Point (NAD83 Z20)
Mineralised Interval
Easting (m)
Northing (m)
RL (m)
From (m)
To (m)
Interval (m)
True Width
521866.9 522288.3 522062.4 522309.7 522155.7 522161.1 522305.3 522327.4 521865.3 521772.5 522446.5 522257.8 522037.8 522036.3 522216.7 522259.4 522258.4 522115.3 522114.6 522267.1 522265.6 522083.9 522275.1 522214.5 522309.6 522307.1 522303.9 522035.9 522013.7 522285.2 522325.7 522385.7 522386.1 522370.6 522370.1
4990437.6 4990318.1 4990364.5 4990316.4 4990345.1 4990348.5 4990319.3 4990297.8 4990406.1 4990458.4 4990251.2 4990322.5 4990389.4 4990377.3 4990378.3 4990375.3 4990371.6 4990385.9 4990382.9 4990407.5 4990400.8 4990383.5 4990426.9 4990406.6 4990371.8 4990365.0 4990356.4 4990378.3 4990391.1 4990457.2 4990384.3 4990384.3 4990371.9 4990340.8 4990328.6
78.0 34.8 112.6 10.8 106.0 -10.3 55.9 82.1 111.4 70.8 17.1 -9.9 116.0 102.2 -39.3 -39.7 -45.7 10.8 5.2 -130.9 -142.9 56.6 -175.4 -124.1 -65.8 -82.8 -103.9 105.9 117.2 -233.9 -152.2 -134.9 -167.1 -59.8 -85.9
67.6 104.8 19.2 138.4 27.8 190.9 84.3 59.4 20.3 68.3 158.7 158.5 19.5 32.2 193.2 193.7 201.2 134.9 141.7 292.3 309.8 96 328.7 288.2 206.3 227.3 250.6 32 21.9 390.4 298.4 280.2 314 210 237.6
69.6 111.2 27.3 142.6 35.4 193.4 86.6 62.5 24.6 70.4 161 160.6 25.5 49.8 200.6 197.8 204.5 138.2 144.2 302 312.1 98.2 332.3 292.3 214.1 230 252.7 40.2 23.9 400.4 303.9 284.7 319.8 212.1 242.1
2 6.4 8.1 4.2 7.6 2.5 2.3 3.1 4.3 2.1 2.3 2.1 6 17.6 7.4 4.1 3.3 3.3 2.5 9.7 2.3 2.2 3.6 4.1 7.8 2.7 2.1 8.2 2 10 5.5 4.5 5.8 2.1 4.5
1.76 4.85 6.29 3.64 6.22 2.28 1.82 2.68 2.76 1.4 2.05 1.61 5.22 15.6 6.01 3.23 2.61 2.49 1.89 7.38 1.76 1.88 2.65 3.2 5.23 1.84 1.45 7.18 1.8 7.5 3.7 2.88 3.9 1.46 3.22
Composite Gold Grade (g/t Au)
Gram*Metres (True Width)
10.6 3.9 2 14.7 1.5 7.2 2.2 5.1 5.5 4.3 34.8 5.8 2.6 2.6 2.2 10.1 5.3 1.2 50.1 2.5 6.8 3.5 1.8 10.3 12.5 1.8 2.6 3.2 1.1 1.7 66.1 2.4 1.5 3.3 12.3
18.7 18.9 12.6 53.5 9.3 16.4 4.0 13.7 15.2 6.0 71.3 9.3 13.6 40.6 13.2 32.6 13.8 3.0 94.7 18.5 12.0 6.6 4.8 33.0 65.4 3.3 3.8 23.0 2.0 12.8 244.6 6.9 5.9 4.8 39.6
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
Table 1 Continued:
Down-hole Composite Significant Intercepts, Old Austen Mine, Nova Scotia
Hole ID
Easting (m)
Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
BD86-028* BD86-033 BD86-033 BD86-033 BD86-033* BD86-038* BD86-041* BD86-045* BD86-048* BD86-048 BD86-049* BD86-050 BD86-050* BD86-051* BD86-052* BD86-053 BD86-053* BD86-053C* BD86-059* BD87-001* BD87-064* BD87-065* BD87-067A* BD87-1012.5B* BD87-1025A* BD87-1037.5A* BD87-1037.5A BD87-1037.5A BD87-1037.5C* BD87-1062.5A* BD87-1100A BD87-1100A BD87-1100A BD87-1100A* BD87-1112.5A*
522429.19 522369.08
4990416.87 4990376.88
133.5 134.4
-76/192 -70/190
300.53 237.74
522482.66 522443.73 522347.88 522443.73
4990406.29 4990490.28 4990544.33 4990490.28
132.8 129.9 132.5 129.9
-68/193 -77/198 -74/190 -68/197
309.98 457.5 474.27 398.37
522347.88 522443.73
4990544.33 4990490.28
132.5 129.9
-84/195 -86/214
526.4 534.92
522362.04 522152.92 522505.94
4990624.86 4990574.78 4990713.11
128.4 133.7 132.0
-82/177 -68/194 -81/190
558.7 372.5 769.01
522505.94 522474.53 522308.15 522058.97 522498.5584 522500.25 522232.27 522241.05 522253.87
4990713.11 4990789.67 4990881.68 4990604.09 4990479.80 4990489.35 4990400.14 4990371.62 4990373.86
131.7 132.0 127.8 130.9 128.7 128.7 129.8 129.4 129.5
-65/190 -80/190 -62/190 -76/190 -62/190 -76/190 -45/190 -50/190 -45/190
617.22 763.22 699.82 424.4 331.14 409.35 98 79.2 123.44
522260.26 522281.48 522318.32
4990407.13 4990387.32 4990387.80
130.7 130.6 133.5
-45/196 -52/190 -56/185
160.02 163.82 163.67
522332.25
4990383.73
133.0
-56/190
152
Mid-Point (NAD83 Z20)
Mineralised Interval
Easting (m)
Northing (m)
RL (m)
From (m)
To (m)
Interval (m)
True Width
522425.5 522358.1 522357.6 522357.3 522356.8 522462.2 522425.3 522323.5 522417.6 522415.5 522358.0 522434.2 522433.9 522368.7 522124.3 522491.6 522489.8 522458.4 522438.0 522286.4 522036.5 522482.1 522497.1 522221.9 522237.1 522244.3 522242.0 522240.2 522236.4 522265.0 522311.6 522311.1 522310.8 522309.8 522319.3
4990336.3 4990321.7 4990318.6 4990316.8 4990313.3 4990310.8 4990412.9 4990423.4 4990389.0 4990381.3 4990447.1 4990438.8 4990436.3 4990494.6 4990456.3 4990524.0 4990508.7 4990451.3 4990588.7 4990579.7 4990531.5 4990334.1 4990374.4 4990343.3 4990350.1 4990321.2 4990308.4 4990298.7 4990325.4 4990296.5 4990319.2 4990314.5 4990310.9 4990301.4 4990312.5
-114.9 -10.7 -18.2 -22.6 -30.7 -88.0 -177.0 -190.6 -112.4 -129.8 -257.1 -271.0 -282.7 -308.2 -123.3 -426.3 -454.5 -327.5 -453.0 -335.5 -107.4 -128.4 -227.6 72.0 103.3 75.9 63.0 53.1 45.5 12.4 32.0 25.2 19.8 5.7 25.6
260.2 153.4 162.7 167.3 174 240.5 308.8 344.7 258.5 281.6 398.5 399.2 415 261 282.2 591.6 623.7 524.2 621.8 552.9 249.3 294.4 371.5 80.5 33 72.5 90.2 106.5 119 148 120 130 135 152.1 124
262.6 157.9 164.9 169.8 180.6 242.5 325.4 347.8 269.3 284.5 407.5 410.1 418.2 268 287.2 594.4 626.5 539.3 625 555.1 251.4 297.6 377.8 83 35 79 98 109.5 122 152 125.5 132 140 157 135
2.4 4.5 2.2 2.5 6.6 2 16.6 3.1 10.8 2.9 9 10.9 3.2 7 5 2.8 2.8 15.1 3.2 2.2 2.1 3.2 6.3 2.5 2 6.5 7.8 3 3 4 5.5 2 5 4.9 11
1.56 3.05 1.5 1.71 4.54 1.4 9.9 2.24 7.54 2.04 5.92 5.76 1.71 5.35 3.83 2.08 2.12 12.8 2.41 1.83 1.39 2.5 4.29 2.27 1.73 5.89 7.07 2.72 2.71 3.39 4.45 1.62 4.05 3.97 8.9
Composite Gold Grade (g/t Au)
Gram*Metres (True Width)
1.8 3.3 4.1 1.4 3.6 8 2.4 4.8 2.3 2.3 3.5 1.6 15.4 1.8 4 3.4 5.1 3.3 2.4 2.2 2.5 1.9 2.1 7.6 13.8 2.7 1.7 2.6 7.2 2 2.3 1.3 2.1 3.3 2.2
2.8 10.1 6.2 2.4 16.3 11.2 23.8 10.8 17.3 4.7 20.7 9.2 26.3 9.63 15.3 7.1 10.8 42.2 5.8 4.0 3.5 4.8 9.0 17.3 23.9 15.9 12.0 7.1 19.5 6.8 10.2 2.1 8.5 13.1 19.6
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
Page 17 of 31
Table 1 Continued: Hole ID BD87-1112.5A BD87-1125A* BD87-1137.5A BD87-1137.5A BD87-1137.5A* BD87-1150A BD87-1150A* BD87-1150A BD87-950A* BD87-950B* BD87-962.5A* BD87-962.5B* BD87-975A BD87-975A* BD87-975B BD87-975B BD87-975B* BD-88-12U* BD-88-14U* BD-88-3U* BD-88-4U* BD-R1* BD-R10 BD-R10* BD-R11* BD-R12* BD-R13A* BD-R15* BD-R2 BD-R2 BD-R2* BD-R4 BD-R4 BD-R4* BD-R6
Down-hole Composite Significant Intercepts, Old Austen Mine, Nova Scotia
Easting (m)
Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
522343.96 522355.99
4990382.56 4990380.99
134.0 133.7
-56/190 -56/190
152.4 152.4
522365.93
4990378.60
133.9
-56/190
179
522166.71 522172.39 522179.02 522181.43 522191.16
4990388.63 4990412.40 4990380.38 4990393.78 4990375.48
130.5 130.3 130.0 129.9 130.2
-57/184 -55/190 -50/190 -51/187 -46/190
77.7 105.15 105.16 100 100
522197.20
4990409.04
130.4
-44/193
135.03
522017.16 522017.09 522011.52 522011.55 522046.30 522068.65
4990347.07 4990346.54 4990365.38 4990365.58 4990347.40 4990341.89
100.8 102.4 70.1 69.8 97.8 75.6
-29/004 -9/003 -40/002 -31/002 -19/013 -20/010
65.84 55.47 49.99 45.42 54.86 70.1
522067.81 522044.70 522044.65 522008.74 522046.11
4990341.86 4990345.59 4990345.37 4990366.25 4990346.06
75.4 71.3 71.0 67.7 97.6
-23/348 -16/010 -22/010 -21/339 -36/010
70.1 60.96 76.2 50.29 65.53
522068.64
4990330.74
94.4
-2/010
65.67
522122.61
4990311.48
85.7
-18/033
70.1
Mid-Point (NAD83 Z20)
Mineralised Interval
Easting (m)
Northing (m)
RL (m)
From (m)
To (m)
Interval (m)
True Width
522317.8 522330.8 522345.3 522344.3 522342.3 522354.7 522353.2 522351.7 522164.6 522162.2 522168.2 522176.1 522185.5 522179.7 522183.8 522181.5 522176.8 522020.2 522018.9 522011.8 522012.0 522056.6 522072.9 522076.0 522060.8 522052.0 522052.8 522000.6 522048.9 522050.8 522053.0 522072.5 522075.8 522078.1 522131.1
4990304.3 4990309.9 4990322.2 4990316.6 4990305.5 4990317.0 4990308.3 4990300.1 4990361.8 4990356.5 4990321.0 4990352.8 4990344.4 4990312.6 4990350.2 4990340.0 4990319.2 4990383.3 4990377.7 4990385.2 4990394.1 4990391.5 4990365.2 4990380.8 4990383.2 4990381.2 4990385.6 4990387.8 4990360.6 4990369.3 4990379.7 4990352.3 4990370.1 4990383.1 4990324.4
13.2 24.5 45.1 36.7 19.9 41.1 28.0 15.6 89.0 49.2 58.0 79.4 97.5 64.0 72.7 62.7 42.3 81.6 107.1 86.7 86.6 84.2 68.1 63.4 60.4 62.4 56.8 59.3 87.4 81.7 75.3 93.6 93.0 92.5 90.7
142 115.5 105 116 124 111 115.2 141.3 48 98 88 60.5 44 91 80 97 126 36.2 27.5 23 31.4 46.3 23.4 34.5 43 33.7 41.6 22.6 17 27.5 37.9 18.6 35 52.3 14.3
147 148.6 108.7 118 150.5 113 140.4 144 51 100 100 70 47 93 87 99 129 46 35.7 28.7 34.9 48.3 26.3 48.5 46.2 41.2 45.3 26.5 19 29.6 44 25.3 45.1 54.3 18.3
5 33.1 3.7 2 26.5 2 25.2 2.7 3 2 12 9.5 3 2 7 2 3 9.8 8.2 5.7 3.5 2 2.9 14 3.2 7.5 3.7 3.9 2 2.1 6.1 6.7 10.1 2 4
4.05 26.78 2.99 1.62 21.44 1.62 20.39 2.18 2.39 1.64 10.39 8.16 2.7 1.8 6.41 1.83 2.75 6.68 7.99 5.29 3.4 1.65 2.33 11.3 2.38 6.38 2.99 2.56 1.19 1.29 3.89 6.21 9.36 1.85 3.71
Composite Gold Grade (g/t Au)
Gram*Metres (True Width)
4.2 2.3 1.3 8.7 2.6 1.5 2.9 1.3 1.2 1.8 5.1 4.4 3.2 6.2 6.3 1.5 25.7 4.7 4.2 2.9 2.2 9.6 2.5 1.5 4.6 1.7 2.7 2 8 1.5 3 1.9 2.9 22.7 1.9
17.0 61.6 3.9 14.1 55.7 2.4 59.1 2.8 2.9 3.0 53.0 35.9 8.6 11.2 40.4 2.7 70.7 31.4 33.6 15.3 7.5 15.8 5.8 17.0 10.9 10.8 8.1 5.1 9.5 1.9 11.7 11.8 27.1 42.0 7.0
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
Table 1 Continued: Hole ID BD-R6* BD-R6 BD-R8* BD-R8 BD-R9*
Easting (m)
Down-hole Composite Significant Intercepts, Old Austen Mine, Nova Scotia Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
522122.60
4990311.43
83.2
-29/029
94.49
522121.94
4990310.34
83.2
-43/029
49.68
Mid-Point (NAD83 Z20)
Mineralised Interval
Easting (m)
Northing (m)
RL (m)
From (m)
To (m)
Interval (m)
True Width
522135.0 522150.9 522130.7 522136.1 522136.7
4990330.5 4990356.4 4990325.3 4990334.1 4990335.8
93.0 103.0 74.5 69.0 57.2
21.6 53.3 16.8 27.1 36.4
26.2 58.4 19.7 32.9 42.2
4.6 5.1 2.9 5.8 5.8
4.29 4.83 1.78 3.59 2.53
Composite Gold Grade (g/t Au)
Gram*Metres (True Width)
5.5 4.7 35 8.7 2.8
23.6 22.7 62.3 31.2 7.1
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
Page 19 of 31
Table 2:
Hole ID BD85-062 including and and BD86-015 including and and BD86-020 including BD86-045 including BD14-176 including BD14-178 including BD14-180 including
Significant Intercepts Cross Section (equivalent to 1,100 m E Mine Grid), Old Austen Mine, Nova Scotia Easting (m)
Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
522193.2
4990522.0
131.5
-63/189
95.69
522330.5
4990439.3
132.0
-73/194
349.27
522337.4
4990486.7
130.6
-70/192
412.4
522347.9
4990544.3
132.5
-74/190
474.27
522328.6
4990434.8
133.5
-60.8/192.7
266
522332.9
4990459.0
132.4
-60.6/192.2
281
522337.8
4990484.0
132.4
-60.7/189.8
290
From (m) 138.4 138.4 140.46 142.04 206.28 206.28 210.57 212.85 298.36 298.36 344.7 344.73 210 214 227 227 269 269
Mineralised Intersection True To Interval Width (m) (m) (m)
142.6 138.68 141.1 142.57 214.07 207.67 211.66 214.07 303.91 298.78 347.8 346.25 223 215 234 228 274 270
4.2 0.28 0.64 0.53 7.79 1.39 1.09 1.22 5.55 0.42 3.1 1.52 13 1 7 1 5 1
3.64 0.24 0.55 0.46 5.23 0.93 0.73 0.82 3.7 0.28 2.24 1.10 10.16 0.78 5.82 0.83 4.6 0.92
Gold Grade (g/t Au) 14.7 12.9 10.3 85.3 12.5 13.3 19.53 47.1 66.1 814 4.8 8.12 1.9 5.4 2.7 10.15 9.95 46.3
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
St Barbara Limited ABN 36 009 165 066 Level 19, 58 Mounts Bay Road, Perth WA 6000 PO Box 1161, West Perth WA 6872 T +61 8 9476 5555 stbarbara.com.au
ASX: SBM
Table 3: Hole ID BD80-010 BD80-011 CX86-001 CX86-002 CX86-003 including and CX86-004 CX86-005 CX86-006 CX86-007 CX86-008 CX86-009 CX86-010 CX86-011 BD06-067 BD06-069 BD06-071 including BD09-153 including including MS-18-004 MS-19-005 MS-19-006 MS-19-007 MS-19-008 MS-19-009
Significant Intercepts Mill Shaft West, Old Austen Mine, Nova Scotia Easting (m)
Northing (m)
RL (m)
Dip/ Azimuth degrees
Total Depth (m)
521125.5 521115.2 521110.1 521107.1 521124.7
4990630.7 4990609.1 4990568.8 4990527.5 4990472.9
132.0 132.0 137.7 137.8 137.9
-50/192 -51/192 -48/182 -46/192 -55/192
108 178 178.74 136.25 159.3
521211.9 521136.8 521161.5 521189.3 521089.6 521217.5 521229.5 521237.7 521132.7 521152.1 521188.2
4990553.4 4990567.8 4990565.2 4990559.0 4990578.0 4990464.3 4990524.9 4990573.5 4990509.8 4990531.7 4990521.3
138.1 137.8 137.9 138.0 137.6 137.7 138.3 138.1 138.0 138.0 138.2
-55/194 -54/192 -52/193 -54/194 -50/192 -54/193 -45/192 -46/193 -45/191 -43/193 -45/190
121 163.36 185 163.72 157.28 109.4 152.4 94.49 151 150 131
521068.0
4990625.6
137.3
-45/190
260
521122.0 521291.3 521228.6 521216.1 521155.0 521045.5
4990687.0 4990456.1 4990589.5 4990480.9 4990614.7 4990508.2
134.0 138.5 133.4 137.2 134.1 137.3
-45/190 -46/190 -46/190 -46/190 -45/189 -46/190
191 110 212 152 218.41 152
Downhole Mineralised Intersection From (m)
39.78 38.83 38.83 42
46 68 68 175 176 178
To (m)
Interval (m)
No Significant Intercept No Significant Intercept No Significant Intercept 42.69 2.91 42.9 4.07 39.04 0.21 42.5 0.5 No Significant Intercept No Significant Intercept No Significant Intercept No Significant Intercept No Significant Intercept No Significant Intercept No Significant Intercept No Significant Intercept No Significant Intercept 49 3 73 5 69 1 181 6 177 1 179 1 No Significant Intercept No Significant Intercept No Significant Intercept No Significant Intercept No Significant Intercept No Significant Intercept
Gold Grade (g/t Au)
1.65 19.75 24.00 141.60
1.11 4.88 18.45 5.78 14.35 15.25
NOTES: Assumptions include: Cut Off Grade is 1 g/t Au, Minimum width is 2 m down hole, Maximum internal dilution is 3 m. Coordinates quoted in NAD83/ UTM Zone 20N.
Page 21 of 31
Authorised by Andrew Strelein Managing Director and CEO
Ore Reserve Increased 17% to 1.44 Moz Highlights •
•
Updated Pre-Feasibility Study completed: o
Ore Reserves increased 17% 1 to 1.4 Moz following incorporation of expanded Mineral Resources Estimate 2.
o
Life of Mine (“LOM”) extended to 13 years based solely on Proved and Probable Ore Reserves.
Enhanced Production Profile: o
LOM gold production increased 203,000 ounces to 1.4 Moz.
o
Annual gold production increased to above 120,000 ounces in FY31 and FY32.
o
Average gold production 106,000 ounces per annum.
•
Capital Efficient Design: Development de-risked with an attractive Initial Capital of C$289 million (A$315 million) within the +/-25% AACE Class 4 Estimate range and consistent with the previous Pre-Feasibility Study estimate of C$283 million announced on 21 January 20263 (“Previous PFS”).
•
Low AISC Profile: LOM All-In Sustaining Costs (“AISC”) averaging US$1,098 per ounce (A$1,685 per ounce) underpinned by low open pit strip ratios averaging 2.8:1, strong recoveries from conventional freemilling ores, demonstrated operating experience from Touquoy and costs shared across three mining areas.
•
Improved Project Economics: Increased production profile and mine life delivers a 21% improvement in estimated NPV compared with the Previous PFS 3. o
Post-tax NPV5 of A$1,705 million and IRR of 81.6% (using a gold price of US$3,000/oz and exchange rates of C$1.00 = US$0.71 and C$1.00 = A$1.09); and
o
Post-tax NPV5 of A$2,721 million and IRR of 121.4% (using a gold price of US$4,000/oz and exchange rates of C$1.00 = US$0.71 and C$1.00 = A$1.09).
•
Funding: Development is anticipated to be funded from existing cash position, cashflow from the Touquoy Restart and, if required, from proceeds from the sale of the New Simberi Gold Project.
•
Feasibility Study Accelerated: The Feasibility Study is underway and now targeted for completion in Q3 March FY27 (previously Q4 June FY27). Final Investment Decision remains targeted for Q4 June FY27.
St Barbara Limited (“St Barbara” or the “Company”) (ASX: SBM) is pleased to announce the updated Pre-Feasibility Study (“Updated PFS”) for the 15-Mile Processing Hub Project (“Project”) in Nova Scotia, Canada. The Updated PFS incorporates the updated Mineral Resource Estimate of 2.5 million ounces of gold announced 28 July 2026, including revised resource models for 15-Mile, Old Austen Mine and Old Mitchell Mine. The Updated PFS estimates stronger project economics, based on a more refined design while remaining within the scope of the Company’s current regulatory submissions. The breakdown of gold production by site with AISC ($US/oz) are show in Figure 1.
1
Ore Reserves based on US$2,000/oz price
2
Refer to ASX announcement on 28 July 2026 titled “15-Mile Processing Hub Mineral Resources Estimate Increases 24% to 2.5 Moz”
3
Refer to ASX announcement on 21 January 2026 titled “15-Mile Processing Hub Pre-Feasibility Completed”
St Barbara Limited ABN 36 009 165 066 Level 19, 58 Mounts Bay Road, Perth WA 6000 PO Box 1161, West Perth WA 6872 T +61 8 9476 5555 stbarbara.com.au
ASX: SBM
Figure 1: Annual Gold Production by Site and AISC ($US/oz) 140
Gold Production (koz)
120
$1,600
100 $1,200
80 60
$800
40 $400
20
FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 15-Mile
Old Austen Mine
Old Mitchell Mine
All-in Sustaining Costs ($US/oz)
$2,000
--
All-in Sustaining Costs (AISC)
St Barbara has now accelerated work on the Feasibility Study, which is now targeted for completion in Q3 March FY27 (previously targeted for Q4 June FY27). St Barbara is well funded for development of the 15-Mile Processing Hub Project. At 31 August 2026 the Company had A$427 million, is on track for operating cashflow to resume from the Touquoy Restart at the start of Q3 March FY26, and has announced, on 10 September 2026, the agreement with Lingbao to sell the Company’s remaining stake in New Simberi Gold Project in return for cash totalling A$453 million plus royalties. St Barbara Managing Director and CEO Andrew Strelein said: “The evolution of 15-Mile continues as we undertake further work in preparing for the development of what will be a long-life, low-cost development in a jurisdiction we know well. A 17% larger Ore Reserve, a 13 year mine life and a 21% lift in net present value, for essentially unchanged capital, is the outcome of disciplined work by our team and our advisers. Bringing the Feasibility Study forward a quarter reflects our confidence in the Project and keeps us on track for Final Investment Decision in June 2027.”
Overview The Updated PFS for the 15-Mile Processing Hub Project was led by Ausenco Engineering Canada ULC (“Ausenco”), with mine planning undertaken by Moose Mountain Technical Services (“MMTS”). The Updated PFS leverages the Previous PFS completed in January 2026 4 with updated resource models and associated changes to mine design, pit sequencing, stockpiles and other infrastructure. The Project re-uses components of the existing Touquoy processing plant to reduce capital costs, delivery times and project design risk. The Touquoy processing plant is currently being refurbished for the Touquoy Restart Project to process remaining ore stockpiles. A larger newly constructed ball mill plus new leach tanks are again included in the Updated PFS design to achieve throughput of 3 million tonnes per annum. The 15-Mile Processing Hub Project location is approximately 35 kilometres from Touquoy. The Old Austen Mine is located approximately 16 kilometres southwest of 15-Mile and Old Mitchell Mine is approximately 40 kilometres northeast of 15-Mile. The respective project locations are shown in Figure 2 below. Project layouts for 15-Mile, Old Mitchell Mine and Old Austen Mine are shown in Figures 3 to 5.
4
Refer to ASX announcement on 21 January 2026 titled “15-Mile Processing Hub Pre-Feasibility Completed” Page 2 of 90
Figure 2: Project Locations in Nova Scotia, Canada
Page 3 of 90
Figure 3: 15-Mile Processing Hub Layout
Page 4 of 90
Figure 4: Old Mitchell Mine Satellite Mine Layout
Page 5 of 90
Figure 5: Old Austen Mine Satellite Mine Layout
Page 6 of 90
Updated Pre-Feasibility Study Project Economics Estimates and Financial Assumptions The Updated PFS capital cost estimate meets the +/- 25% AACE Class 4 1 level of accuracy. The Updated PFS was led by Ausenco, an industry leader in cost-effective design and construction, and who successfully delivered Atlantic’s Touquoy Project construction in 2017. Ausenco was supported by MMTS for mine design aspects. A summary of the Updated PFS project economics and mine physicals on the 15-Mile Processing Hub Project are outlined in Tables 1-1 to 1-4 below and shown graphically in Figure 6 and Figure 7. The Updated PFS estimates a Pre-Tax NPV5 of C$2,175 million (A$2,371 million) and a Pre-Tax IRR of 98.1% using a gold price of US$3,000 per ounce. Post-Tax, at US$3,000 per ounce, the Updated PFS estimates a NPV5 of C$1,565 million (A$1,705 million) and an IRR of 81.6%, with payback of Initial Capital in one year. Table 1-1: Project Economics Project Economics
Unit
Gold Price
US$/oz
$3,000
C$:US$
0.71
US$/oz Au
$876
Exchange Rate Cash Costs
2
All-In Sustaining Costs
Life of Mine (LOM) Total or Average
US$/oz Au
$1,098
Cash Costs2
A$/oz Au
$1,345
All-In Sustaining Costs3
A$/oz Au
$1,685
Pre-Tax NPV5
C$M
$2,175
Pre-Tax NPV5
A$M
$2,371
Pre-Tax IRR
%
98.1%
Pre-Tax Payback on Initial Capital
years
1.0
Post-Tax NPV5
C$M
$1,565
Post-Tax NPV5
A$M
$1,705
Post-Tax IRR
%
81.6%
years
1.0
5.41
3
Post-Tax Payback of Initial Capital Post-Tax NPV/Capex Ratio
Table 1-2: Capital, Closure and Reclamation Costs Capital Costs (in current dollars)
Life of Mine Total C$M
Life of Mine Total A$M
Initial Capital
$289
$315
Life of Mine Sustaining Capital
$234
$255
Life of Mine Expansion Capital
$169
$184
Closure Costs
$210
$229
Salvage Costs
-$15
-$16
1
Refer to AACE International’s recommended practices relating to cost estimate classification and estimate accuracy as applied in Engineering, Procurement, and
Construction for the Process Industries. 2
Cash costs consist of operating costs (mine, processing, material transport and G&A), refining costs and transport costs and royalties
3
All-In Sustaining Costs include cash costs, sustaining capital, closure cost and salvage value Page 7 of 90
Table 1-3: Operating Costs Operating Costs
Unit
Life of Mine (LOM) Average
Mining Cost*
$C/t milled
C$18.04
Ore Transport
$C/t milled
C$5.05
Processing Cost
$C/t milled
C$10.61
G&A Cost
$C/t milled
C$5.62
Total Operating Cost
$C/t milled
C$39.32
- C$4.91/t mined.
Table 1-4: Operating Physicals Summary Production Summary
Unit
Life of Mine (LOM) Total or Average
Mine Life
years
13.0
Total Waste Mined
Kt
109,237
Total Ore Mined
Kt
38,697
Average Strip Ratio
w:o
2.8
Total Mill Feed Tonnes
Kt
38,697
Average Mill Feed Grade
g/t
1.16
Total Contained Gold
koz
1,438
Total Recovered Gold
koz
1,377
Average Gold Recovery
%
95.8%
Average Annual Gold Production
koz
106
The Updated PFS estimate for 15-Mile Processing Hub Project production has increased to 38.7 Mt at an average grade of 1.16 g/t of Au totalling 1,438 koz. of contained gold and a reduced waste volume of 109.2 Mt (down from 114.5 Mt) thereby reducing the strip ratio to just 2.8:1.
Page 8 of 90
Post-Tax Undiscounted Free Cash Flow
$400
$3,000
$300
$2,250
$200
$1,500
$100
$750
$0
$0
-$100
-$750
-$200
-$1,500
-$300
-$2,250
-$400
-1
1
2
3
4
5
6
7 8 9 Project Year
10
11
12
13
14
15
16
Post-Tax UFCF (C$M)
Post-Tax UFCF (A$M)
Post-Tax Cumulative UFCF (C$M)
Post-Tax Cumulative UFCF (A$M)
-$3,000
Post-Tax Cumulative Unlevered Free Cash Flow (C$M & A$M)
Post-Tax Unlevered Free Cash Flow (C$M & A$M)
Figure 6: Projected Annual and Cumulative LOM Post-Tax Unlevered Free Cash Flow
Page 9 of 90
Gold Production
1.60
140
1.40
120
1.20
100
1.00
80
0.80 60
0.60
40
0.40
20
0.20 0.00
Gold Production (koz)
Head Grade (g/t)
Figure 7: Projected LOM Production
1
2
3
4
5
6
7
8
9
10
11
12
13
0
Project Year Gold Production (koz)
Head Grade (g/t)
Sensitivity Analysis A sensitivity analysis has been conducted on the Post Tax NPV5 for the 15-Mile Processing Hub Project. Note that these sensitivities assess variables independently whereas movements in more than one variable may either exacerbate or offset the calculated sensitivities of other variables. Table 5, Table 6 and Table 7 below show the sensitivities calculated for gold price, initial capital expenditure, total operating costs and different exchange rates. Table 5: Post-Tax NPV5 Sensitivity, C$M Gold Price (US$/oz)
Base Case
Initial Capex (-10%)
Initial Capex (+10%)
Opex (-10%)
Opex (+10%)
FX (0.65)
FX (0.75)
$2,500
$1,098
$1,121
$1,076
$1,173
$1,024
$1,314
$974
$3,000
$1,565
$1,587
$1,542
$1,639
$1,490
$1,823
$1,415
$3,500
$2,031
$2,053
$2,008
$2,105
$1,956
$2,332
$1,857
$4,000
$2,497
$2,519
$2,474
$2,571
$2,422
$2,841
$2,298
$4,500
$2,962
$2,984
$2,940
$3,037
$2,888
$3,348
$2,739
$5,000
$3,427
$3,447
$3,406
$3,501
$3,352
$3,854
$3,180
Page 10 of 90
Table 6: Post-Tax NPV5 Sensitivity, A$M Gold Price (US$/oz)
Base Case
Initial Capex (-10%)
Initial Capex (+10%)
Opex (-10%)
Opex (+10%)
FX (0.65)
FX (0.75)
$2,500
$1,197
$1,222
$1,173
$1,279
$1,116
$1,432
$1,062
$3,000
$1,705
$1,730
$1,681
$1,787
$1,624
$1,987
$1,543
$3,500
$2,213
$2,238
$2,189
$2,295
$2,132
$2,542
$2,024
$4,000
$2,721
$2,746
$2,697
$2,803
$2,640
$3,096
$2,505
$4,500
$3,229
$3,252
$3,205
$3,310
$3,148
$3,649
$2,985
$5,000
$3,735
$3,757
$3,712
$3,816
$3,654
$4,201
$3,466
Table 7: Post-Tax IRR Sensitivity Gold Price (US$/oz)
Base Case
Initial Capex (-10%)
Initial Capex (+10%)
Opex (-10%)
Opex (+10%)
FX (0.65)
FX (0.75)
$2,500
60.6%
68.0%
54.7%
63.5%
57.7%
70.4%
54.9%
$3,000
81.6%
91.2%
73.8%
84.3%
78.9%
92.9%
75.0%
$3,500
101.8%
113.4%
92.3%
104.3%
99.2%
114.5%
94.3%
$4,000
121.4%
135.0%
110.2%
123.8%
118.9%
135.5%
113.1%
$4,500
140.4%
155.8%
127.7%
142.9%
138.0%
155.8%
131.3%
$5,000
158.9%
175.9%
144.9%
161.2%
156.6%
175.3%
149.2%
Comparison to Previous January 2026 Pre-Feasibility Study Tables 8 and 9 below provide a detailed comparison between the Previous PFS and the Updated PFS. Incorporating the updated Mineral Resource models has increased ore tonnage, average grade, total gold production and average annual gold production, with minimal cost impacts. This has resulted in an increased NPV and IRR and lower AISC. Table 8: Mining and Processing Physical Comparison Previous Pre-Feasibility Study and Update Production Summary
Unit
September 2026 PFS Update
January 2026 PFS Previous
Variance
Mine Life
years
13.0
11.4
1.6
Total Ore Mined
Kt
38,697
33,391
5,306
Average Strip Ratio
w:o
2.8
3.4
-0.6
Total Mill Feed Tonnes
Kt
38,697
33,391
5,306
Total Material Mined
Kt
168,302
177,989
-9,687
Average Mill Feed Grade
g/t
1.16
1.15
0.01
Total Contained Gold
koz
1,438
1,232
206
Total Recovered Gold
koz
1,377
1,174
203
Average Gold Recovery
%
95.8%
95.3%
0.5%
Average Annual Gold Production
koz
106
103
3
Page 11 of 90
Table 9: Project Economics Comparison Previous Pre-Feasibility Study and Update Project Economics
September 2026 PFS Update
January 2026 PFS Previous
Variance
Gold Price
Unit US$/oz
$3,000
$3,000
Exchange Rate
C$:US$
0.71
0.71
Initial Capital Costs
C$M
$289
$283
$6
Initial Capital Costs
A$M
$315
$308
$7
Cash Costs 1
US$/oz Au
$876
$908
-$32
All-In Sustaining Costs 2
US$/oz Au
$1,098
$1,188
-$90
Cash Costs2
A$/oz Au
$1,345
$1,395
-$50
All-In Sustaining Costs3
A$/oz Au
$1,685
$1,824
-$139
Pre-Tax NPV5
C$M
$2,175
$1,781
$394
Pre-Tax NPV5
A$M
$2,371
$1,941
$430
Pre-Tax IRR
%
98.1%
96.2%
1.9%
Pre-Tax Payback on Initial Capital
years
1.0
0.9
0.1
Post-Tax NPV5
C$M
$1,565
$1,286
$278
Post-Tax NPV5
A$M
$1,705
$1,402
$303
Post-Tax IRR
%
81.6%
80.2%
1.4%
years
1.0
0.9
0.1
5.41
4.55
0.86
Post-Tax Payback of Initial Capital Post-Tax NPV/Capex Ratio
1
Cash costs consist of operating costs (mine, processing, material transport and G&A), refining costs and transport costs and royalties
2
All-In Sustaining Costs include cash costs, sustaining capital, closure cost and salvage value Page 12 of 90
Mineral Resources The Mineral Resource Estimate supporting the 15-Mile Processing Hub Project was detailed in the Company’s ASX announcement dated 28 July 2026 and titled “15-Mile Processing Hub Minerals Resources Estimate Increases 24% to 2.5Moz” and is summarised below in Table 10. As disclosed in the July 2026 release, the Mineral Resource update incorporated a validated data package of 436 historical drill holes (71,000 metres) across the 15-Mile, Old Mitchell Mine and Old Austen Mine deposits. The increased data density supported a transition from Multiple Indicator Kriging (MIK) to an Ordinary Kriging (OK) estimation methodology based on enhanced confidence in mineralisation continuity. The Company confirms that it is not aware of any new information or data that materially affects the information included in the 28 July 2026 announcement and confirms that all material assumptions and technical parameters underpinning the estimate continue to apply and have not materially changed. Table 10: 15-Mile Processing Hub Project Mineral Resources Summary Deposit 15-Mile
Tonnes (Mt)
Measured Grade (g/t Au)
Gold ('000)
Tonnes (Mt)
Indicated Grade (g/t Au)
Gold ('000)
Tonnes (Mt)
Inferred Grade (g/t Au)
Gold ('000)
Tonnes (Mt)
Total Grade (g/t Au)
Gold ('000)
30.2
1.2
1,190
5.5
1.1
200
35.7
1.2
1,390
Old Mitchell Mine
13.2
1.2
510
3.3
1.4
150
16.5
1.2
660
Old Austen Mine
4.4
1.4
190
5.2
1.4
230
0.6
1.9
40
10.2
1.4
460
Total Atlantic
17.6
1.2
700
38.7
1.3
1,570
6.1
1.2
240
62.4
1.2
2,510
Notes: 1.
Cut-off Grade 0.3 g/t Au
Mineral Resources are reported constrained by a US$2,500/oz pit shell.
Rounding may result in apparent summation differences between tonnes, grade and contained metal.
Page 13 of 90
Ore Reserves The Proved and Probable Ore Reserve for the 15-Mile Processing Hub Project has also been updated with this Updated PFS to 38.7 Mt at 1.2 g/t Au, containing 1,440 koz of gold. This represents an increase of 210 koz compared to 31 December 2025 statements. The updated Ore Reserves for the Project are outlined below in Table 11. Table 11: Gold Production by Ore Reserve Classification Deposit 15-Mile Old Mitchell Mine Old Austen Mine Total Atlantic
Tonnes (Mt)
Proved Grade (g/t Au)
Probable Grade Tonnes (g/t (Mt) Au)
Gold ('000)
Gold ('000)
Total Proved and Probable Grade Tonnes Gold (g/t (Mt) ('000) Au)
23.6
1.1
860
23.6
1.1
860
8.1
1.1
290
1.6
1.0
50
9.6
1.1
340
4.1
1.3
170
1.4
1.6
70
5.5
1.3
240
12.1
1.2
450
26.6
1.2
980
38.7
1.2
1,440
Notes: 1.
Sub-totals and totals are rounded to the nearest 10 koz
Rounding may result in apparent summation differences between tonnes, grade and metal contained.
Page 14 of 90
15-Mile Processing Hub Project Development and Operations Discussion Mining Summary All open pits across 15-Mile, Old Mitchell Mine and Old Austen Mine have been optimised and redesigned with the new Mineral Resource models. Each open pit will be mined with conventional drill, blast, load and haul operations. There are four open pits at 15-Mile named Egerton-Maclean, Plenty, Hudson and 149. There is a single open pit at Old Austen Mine and another single open pit at Old Mitchell Mine. Ore is anticipated to be sourced solely from 15-Mile until Year 3. Old Mitchell Mine ore mining and haulage is anticipated to commence at that point. Ore mining and haulage from Old Austen Mine is then anticipated to commence in Year 4. In summary: •
Mining over a 13-year period with a peak annual mining rate of 16.3 Mt;
•
A total of 38.7 Mt of ore is mined at an average grade of 1.16 g/t, with a total of 109.2 Mt of waste mined delivering a low strip ratio of 2.8 tonnes of waste per tonne of ore;
•
The primary production equipment is based on a conventional fleet comprising 144 mm DTH production drills, 4.5 m3 bucket production excavators and 64 tonne payload off-highway mining trucks; and
•
Ore stockpile rehandling design at 15-Mile comprises two small Run of Mine stockpiles for storing mill feed with peak inventory estimated at 0.3 Mt.
The mining sequence across the deposits has been optimised to continue to deliver a stable gold production profile over the life of mine while also balancing fleet requirements across the three sites (as shown in Figure 9 below). Completion of open pits at 15-Mile is sequenced to allow for the backfilling of the open pits with waste rock to accelerate final landforms for closure. Potentially acid generating (PAG) waste rock will be rehandled back into open pits at Old Austen Mine and Old Mitchell Mine upon completion of mining for long-term geochemical stability, resulting in improved post closure landforms.
3.50
1.60
3.00
1.40 1.20
2.50
1.00
2.00
0.80
1.50
0.60
1.00
0.40
0.50
Head Grade (g/t)
Tonnes Milled (Mt)
Figure 8: Tonnes Milled and Gold Grade (g/t)
0.20 Y01
Y02
Y03
Y04
Y05
Y06
Y07
Y08
Y09
Y10
Y11
Y12
Y13
Project Year Tonne Milled (Mt)
Head Grade (g/t)
Page 15 of 90
Figure 9: Mine Plan Production Summary 18,000 16,000
5
Total Mined (kt)
14,000 12,000
4
10,000
3
8,000 6,000
2
4,000
1
2,000
Y-1 Y01 Y02 Y03 Y04 Y05 Y06 Y07 Y08 Y09 Y10 Y11 Y12 Y13 Period Ore Mined
Waste Mined
Ratio (Waste Mined/ Ore Mined
6
0
Ratio (Waste:Ore Mined)
Figure 10 shows a typical cross-section view through the main Egerton-Maclean pit of the 15-Mile Project. Figure 11 shows a typical cross-section view through the Old Austen Mine deposit. Figure 12 shows a typical cross-section view through the Old Mitchell Mine deposit. Blocks in the section view show gold grade in all blocks above the respective gold cut-off grade. Inferred blocks are shown as hatched blocks. Green lines represent the topography, beige lines the overburden/bedrock contact surfaces and the blue and orange lines the designed open pits. Figure 10: Cross Section Through Egerton-Maclean Pit at 15-Mile Looking West
Page 16 of 90
Figure 11: Cross Section Through Old Austen Mine Pit Looking West
Page 17 of 90
Figure 12: Cross Section Through Old Mitchell Mine Pit Looking North
Mining Methods and Assumptions 15-Mile Open pit optimisation for 15-Mile was completed using Pseudoflow optimisation software. Ultimate economic pit limits were chosen independently for each deposit and range from 0.68 to 0.74 revenue factor pit shells. Pit designs incorporating further practical mining considerations, such as minimum mining width, bench configurations and ramp access are carried out using these target optimisation shells. The overall slopes used for the pit optimisation and design work were sourced from reports carried out by external geotechnical consultants, with overall slopes ranging from 35 to 51 degrees in the various geotechnical zones. Minimum phase mining width is planned at 45 m with pit bottoms designed down to 25 m. Mining dilution and losses are tagged within the mine plan block model, based on the distribution of ore and waste blocks on each bench, treating isolated mineralised blocks as losses and waste edge blocks as dilution. An effective 17% dilution is applied on the Egerton-Maclean deposit, 18% on the Hudson deposit, 26% on the Plenty deposit and 13% on the 149 deposit, with an additional 3% mining loss applied to all diluted ore tonnages. The mine and mill production schedules are developed using the bench ore and waste tonnages within the phased pit designs. Mine operations are planned as owner-operated with conventional drill, blast, load and haul activities. Mining cost estimates are built up from first principles. Equipment and operations productivity is based on historical production at the nearby Touquoy gold mine and simulated haul cycle times for all planned 15-Mile sources and destinations. Equipment fuel, lube, tire, equipment parts, explosives and labour usage rates have also been estimated based on experience from the nearby Touquoy gold mine, together with supplier recommendations. Costs inputs are based on supplier quotations from Q2 December FY26. Old Austen Mine Open pit optimisation for Old Austen Mine was completed using Pseudoflow. The ultimate economic pit limit is based on a 0.45 revenue factor pit shell. Pit designs incorporating further practical mining considerations, such as minimum mining width, bench configurations and ramp access were carried out using these target optimisation shells. The overall slopes used for the pit optimisation and design work were sourced from reports carried out by external geotechnical consultants, with overall slopes ranging from 42 to 53 degrees in the various geotechnical zones. Minimum phase mining width is planned at 45 m, with pit bottoms designed down to 25 m. Mining dilution and losses are tagged within the mine plan block model, based on the distribution of ore and waste blocks on each bench, treating isolated mineralised blocks as losses and waste edge blocks as dilution. An effective 12% dilution is applied on the Old Austen Mine, with an additional 3% mining loss applied to all diluted ore tonnages. The mine and mill production schedules were developed using the bench ore and waste tonnages within the phased pit designs. Mine operations are planned as owner-operated with conventional drill, blast, load and haul activities.
Page 18 of 90
Mining cost estimates are built up from first principles. Equipment and operations productivity is based on historical production at the nearby Touquoy gold mine and simulated haul cycle times for all planned Old Austen Mine sources and destinations. Equipment fuel, lube, tire, equipment parts, explosives and labour usages rates have also been estimated based on experience from the nearby Touquoy gold mine, together with supplier recommendations. Cost inputs for these supplies and workers are based on internal Canadian cost databases from Q2 December FY26. Old Mitchell Mine Open-pit optimisation for Old Mitchell Mine was completed using Pseudoflow. The ultimate economic pit limit is based on a 0.63 revenue factor pit shell. Pit designs incorporating further practical mining considerations, such as minimum mining width, bench configurations and ramp access were carried out using this target optimisation shell. The overall slopes used for the pit optimisation and design work were sourced from reports carried out by external geotechnical consultants, with overall slopes ranging from 29 to 49 degrees in the various geotechnical zones. Minimum phase mining width is planned at 45 m, with pit bottoms designed down to 25 m. Mining dilution and losses are tagged within the mine plan block model, based on the distribution of ore and waste blocks on each bench, treating isolated mineralised blocks as losses and waste edge blocks as dilution. An effective 16% dilution is applied on the Old Mitchell Mine, with an additional 3% mining loss applied to all diluted ore tonnages. The mine and mill production schedules are developed using the diluted bench ore and waste tonnages within the phased pit designs. Mine operations are planned as owner-operated with conventional drill, blast, load and haul activities. Mining cost estimates are built up from first principles. Equipment and operations productivity is based on historical production at the nearby Touquoy gold mine and simulated haul cycle times for all planned Old Mitchell Mine sources and destinations. Equipment fuel, lube, tire, equipment parts, explosives and labour usages rates have also been estimated based on experience from the nearby Touquoy gold mine, together with supplier recommendations. Cost inputs for these supplies and workers are based on internal Canadian cost databases from Q2 December FY26.
Page 19 of 90
Processing Summary 15-Mile Processing Hub The metallurgical testing confirmed that the 15-Mile, Old Austen Mine and Old Mitchell Mine ores are free-milling and highly amenable to conventional recovery methods of gravity and carbon in leach cyanidation. Process studies undertaken by Ausenco confirmed that the Touquoy processing plant is suitable to achieve high gold recovery from 15-Mile, Old Austen Mine and Old Mitchell Mine ores. Therefore, the process flowsheet has been designed to maximise re-purposing of Touquoy equipment in order that Initial Capital is optimised and to avoid longer lead times for new equipment. The achievement of the anticipated 3 Mtpa processing rate requires minimal changes to the overall process flowsheet. The Touquoy processing plant achieved approximately 3 Mtpa during operations. Achievement of the required throughput for 15-Mile, Old Austen Mine and Old Mitchell Mine ores however requires substitution of the existing 3.5MW ball mill for a new 5.5 MW ball mill and the addition of one leach tank (compared to that designed for the Touquoy processing plant) to achieve optimal retention time. Ore from Old Austen Mine and Old Mitchell Mine pits is planned to be transported 64 km and 72 km respectively to the 15-Mile Processing Hub via public roads. Testwork indicates the ore is medium hardness with a bond mill work index of approximately 13.8 (metric) for 15-Mile, 15.3 (metric) for Old Austen Mine and 16.6 (metric) for Old Mitchell Mine. The process plant is scheduled to operate at a rate of 8,219 tonnes per day at a mill availability of 92%. The process design for the 15-Mile Processing Hub is shown in Figure 13. The design of the processing plant comprises; •
Three-stage crushing, consisting primary jaw crusher, a secondary cone crusher and a tertiary cone crusher with associated material handling and screening equipment;
•
Grinding of crushed material to 80% passing 150 – 180 microns (depending on open pit source) with a 5 (diameter) x 8 (length) metre ball mill equipped with a 5.5 MW motor and operating in closed circuit with hydro-cyclones;
•
A gravity concentration circuit is included in the grinding area with gold recovery up to 60% expected from the gravity concentrate, depending on ore type;
•
Leaching and adsorption circuit includes two leach tanks and six carbon-in-leach tanks, for a total leach and adsorption retention time of 24 hours;
•
Cyanide destruction using an SO2/air system on the final tailings slurry; and
•
Final tails from the cyanide destruction circuit will be discharged to the tailings management facility.
Page 20 of 90
Figure 13: Process Flow Diagram
15-Mile Metallurgy Metallurgical testing for 15-Mile ore was completed on drill core samples from each of the four open pits at Base Metallurgical Laboratories Ltd (“BaseMet”), independent of St Barbara, in Q2 September FY23. The test results indicated an overall recovery of approximately 97.1% is achievable on all 15-Mile ore sources. Old Austen Mine Metallurgy Metallurgical testing for Old Austen Mine was completed on drill core samples at ALS Metallurgy Ltd, independent of St Barbara, in Q2 March FY15 and Q3 March FY21. Additional metallurgy testing for Old Austen Mine was completed on drill core samples at BaseMet in Q3 March FY15 and Q3 March FY21. The test results indicated an overall recovery for the Old Austen Mine ore of approximately 95.8% is achievable. Old Mitchell Mine Metallurgy Recent metallurgical test work for Old Mitchell Mine was completed on drill core samples at BaseMet, independent of St Barbara, in Q1 September FY26 and Q2 December FY26. The test results indicate that an average recovery of approximately 92.1% is achievable for the Old Mitchell Mine ore.
Tailings Management 15-Mile Processing Hub The tailings management design was completed by Ausenco and is based on conventional slurried tailings storage to help reduce potential acid generation. The tailings management facility will be centreline construction and will consist of a “starter” storage facility followed by subsequent engineered centreline lifts during operation. Potentially acid-generating waste material mined in the early years of production will be stored in the tailings management facility, along with any overburden material potentially impacted by historic mining at all sites (i.e mining that occurred in the late 1800’s/early 1900’s). Old Austen Mine and Old Mitchell Mine Ore from Old Austen Mine and Old Mitchell Mine will be transported and processed at the 15-Mile processing facility and accordingly tailings from the Old Austen Mine and Old Mitchell Mine processed ore will be stored in the 15-Mile tailings management facility. The 15-Mile tailings management facility has been designed with sufficient storage capacity to account for all deposits. Page 21 of 90
Approvals and Environmental Considerations All three project sites have historic mine workings and tailings from the late 1800’s and early 1900’s. The project has been designed to rehabilitate any areas impacted by historic mine workings or tailings, using similar successful methodologies successfully employed at Touquoy. The projects have each been designed with consideration of environmental constraints, feedback from stakeholders during previous design consultation and with final closure planning incorporated in the design. 15-Mile Project The 15-Mile Project is subject to Provincial and Federal approvals as applicable prior to development. This includes permits such as Environmental Assessment, MDMER Schedule 2 and Fisheries Authorisation. The 15-Mile Project has been designed to reduce environmental impact relative to previous designs, including limited use of low-grade stockpiles, a more efficient tailings design and reduced waste rock disturbance. Long-term surface storage of potentially acid-generating (“PAG”) waste material has been eliminated. All PAG material will be deposited in the tailings storage facility or backfilled into completed open pits. This is industry-recognised best practice. Seloam Brook was redirected into the mineralised area during historic mining activities and now runs through areas of historic tailings within the 15-Mile Project area. Seloam Brook and its watershed is heavily impacted by historic mining. Presently the area contains tailings and byproducts of the historic mining process. Seloam Brook is proposed to be realigned to be close to where it is believed to have originally run, using an engineered design that will enhance fish habitat and ensure existing flows are accommodated. As part of this diversion, the historic contamination in the area will be rehabilitated, with approximately 61 hectares impacted by historic tailings anticipated to be rehabilitated and contained in modern storage infrastructure. Old Austen Mine The Old Austen Mine is subject to Provincial and Federal approvals as applicable prior to development. This includes permits such as Environmental Assessment, MDMER Schedule 2 and Fisheries Authorisation. The Old Austen Mine, as proposed, has taken into consideration environmental limitations and opportunities to reduce impacts. This has resulted in a reduction of approximately 50% in surface disturbance compared to previous designs. This includes a smaller pit design, less mined waste, better management of PAG material, no requirement for a new haul road, minimised trucking frequency and reduced water consumption. The project footprint has largely reduced as a result of the smaller pit design. This resulted in reduced waste rock stockpiles. The PAG material will be separated from the non-acid-generating material. The PAG material will be rehandled back into the completed pit to minimise acid generation potential. The Old Austen Mine no longer requires the construction of a 12.3 km haul road to the Touquoy processing facility because the ore will now be transported in the opposite direction to 15-Mile via public roads. Old Mitchell Mine The Old Mitchell Mine is subject to Provincial and Federal approvals as applicable prior to development. This includes permits such as Environmental Assessment, MDMER Schedule 2 and Fisheries Authorisation. The Old Mitchell Mine has been completely re-designed, taking into consideration previous feedback from regulators, communities, stakeholder and rights holders. The Old Mitchell Mine open pit has been reduced in size to avoid the need for realignment of public roads and to avoid nearby waterways. Additionally, the Old Mitchell Mine is now a quarry-style operation with no processing facility, no tailings management facility or need for significant water extraction. The site design also includes a lined stockpile for PAG material mined during operation to be backfilled into the open pit immediately after operation. This will minimise impacts and allow final reclamation of landforms significantly sooner. The site layout has been optimised to minimise disturbance to existing potentially sensitive watersheds while capturing all site runoff for water treatment before discharge.
Social Acceptability and License to Operate Early information and engagement meetings were previously held with local communities, First Nation communities, and local, Provincial and Federal governmental authorities on earlier concepts proposed by predecessor proponent Atlantic Gold. The extensive feedback has significantly influenced several of the changes in the design of the 15-Mile Processing Hub and the open pits proposed at Old Austen Mine and Old Mitchell Mine. Consultation through the Community Liaison Committees has continued during the redesign of the respective projects and the Company looks forward to presenting these new project designs for feedback in future sessions. Community engagement offices have been established in Sheet Harbour, Stellarton and Guysborough. Page 22 of 90
The 15-Mile Processing Hub, along with the Old Austen Mine and Old Mitchell Mine open pits, is anticipated to be primarily subject to Provincial permitting and regulations but also certain Federal environmental regulations including fisheries authorisations. Environmental baseline studies and impact analysis are well advanced to support permitting. St Barbara will continue to regularly meet with stakeholders and First Nation representatives as project milestones are reached and will be presenting and discussing the study results with host communities.
Capital Costs The Initial Capital cost for the 15-Mile Processing Hub Project is estimated at C$289 million (A$315 million), including allowances for contingency (see Table 12). Sustaining capital is estimated to be C$234 million (A$255 million) over life of mine. Life of Mine Expansion Capital is estimated to be C$169 million (A$184 million) for the Old Austen Mine and Old Mitchell Mine Projects but these expenditures are well after the commissioning of the 15-Mile Initial Capital investment. Closure and reclamation, inclusive of backfilling material in pits at all three sites, is estimated to be C$210 million (A$229 million). Capital and sustaining costs were compiled by Ausenco and MMTS from the following sources: •
Mining initial capital cost estimates were developed by MMTS with cost estimates including the equipment lease payments for the mine fleet and the pre-production mine operating costs for the mining of material from the open pits and the targeting of waste rock quantities in sufficient volumes for construction purposes;
•
Mining sustaining capital cost estimates were developed by MMTS and include equipment leases up to Year 3 based on payments of a 10% down payment in the period the equipment is commissioned followed by 16 quarterly lease balance payments, calculated on the basis of a 7% interest rate while all mine fleet purchases subsequent to year 3 of the Project assumed to be purchased under a traditional capital purchase arrangement;
•
Owner’s costs were developed by St Barbara and include owner’s team, environmental offsetting, preoperational monitoring, insurance, power connections, communications and minor infrastructure upgrades;
•
Processing, infrastructure, project delivery and project indirect cost estimates were developed by Ausenco and are inclusive of a 3 Mtpa conventional leach/CIL processing plant, power substation, tailings facility initial construction and other required infrastructure;
•
The Sustaining Capital cost estimates mainly consist of new infrastructure and the pre-stripping required to initiate mining at Old Mitchell Mine in Year 3 and Old Austen Mine in Year 4 of the life of mine with the remaining sustaining capital mainly consists of tailings management facility lifts that occur through life of mine; and
•
The Life of Mine Expansion Capital costs were developed by Ausenco and MMTS and include the development of the Old Mitchell Mine and Old Austen Mine sites in Year 3 and 4 respectively.
Page 23 of 90
Table 12: Initial and Sustaining Capital Costs (C$M) 1 Initial Capital (C$M)
LOM Sustaining Capital (C$M)
(C$M)
(C$M)
Mining
47
106
152
Processing
74
74
Tailings Management
46
104
151
On Site Infrastructure
25
25
Project Indirect costs
26
26
Owner's Costs
26
24
49
Contingency
44
44
Old Austen Mine Capital (Year 4)
65
65
Old Mitchell Mine Capital (Year 3)
104
104
289
234
169
692
Area
Total
LOM Expansion Capital Total Capital
The estimated Initial Capital total cost of C$289M is after again incorporating the re-use of existing processing equipment from Touquoy wherever practical and maintaining the same consolidated footprint design successfully utilised at Touquoy. Expansion Capital costs relating to Old Mitchell Mine and Old Austen Mine ore only occur in Year 3 and 4 respectively, rather than as part of Initial Capital.
Operating Costs Operating costs have been compiled based on the following sources and assumptions: •
Operating cost estimates are derived from first principles, with benchmarking aligned to actual costs from the Touquoy operation experience, adjusted for cost inflation;
•
Mining unit cost estimates have been estimated by MMTS, built up from first principles, assuming owner-run operations and utilising December 2025 vendor quotes and internal database cost inputs;
•
Processing unit cost estimates have been estimated by Ausenco using first principles, incorporating experience at Touquoy process plant and December 2025 prices for major reagents and grinding media;
•
Ore transportation costs were supported by Allnorth Consultants Limited based on first principles using contractor fleet and operations with road upgrade costs estimated by Gemtec Consulting Engineers through field surveys and public infrastructure reviews; and
•
General and administrative costs were built from first principles, leveraging experience with the Touquoy project adjusted for cost escalation.
Table 13: Life of Mine Operating Costs Cost Centre
C$/t milled
Processing
$10.61
Mining*
$18.04
G&A
$5.62
Ore Transport
$5.05
Total Site Operating Cost
$39.32
- $4.91/t mined. 1
Does not include salvage value and closure costs. Numbers are rounded to the near whole value and may not add up. Page 24 of 90
Table 14. 15-Mile Processing Hub PFS – Gold Production, C1 Cash Cost per Ounce, AISC per Ounce and Capital Requirements Unit
FY29
FY30
FY31
FY32
FY33
FY34
FY35
FY36
FY37
FY38
FY39
FY40
FY41
FY41
Total/ Average
Production Range
koz
85105
125145
115135
90110
86105
85105
90110
100120
95115
90110
100120
95115
95115
95-115
Production Midpoint
koz
96
133
125
98
95
96
100
112
104
102
107
106
105
106
Cash/oz Range
US$/oz
620820
460660
590790
8601,060
1,0801,280
1,0501,250
9701,170
8701,070
8701,070
8801,080
8001,000
680880
560760
810-1010
Cash/oz Midpoint 1
US$/oz
723
559
689
957
1,177
1,146
1,065
967
966
977
895
783
658
876
AISC/oz Range
US$/oz
8301,030
680880
760960
1,1401,340
1,1201,320
1,2901,490
1,0101,210
1,1001,300
9001,100
9001,100
8101,010
8501,050
8501,050
1090-1290
AISC/oz Midpoint 2
US$M
928
777
862
1,239
1,223
1,393
1,109
1,199
1,006
1,007
908
954
946
1,098
Project Initial Capital Range
US$M
164256
164-256
Project Initial Capital Midpoint
US$M
205
205
LOM Growth Capital Range
US$M
5992
3863
97-155
LOM Growth Capital Midpoint
US$M
74
46
120
1
Cash costs consist of mining costs, processing costs, general and administrative costs and refining/transport charges and royalties. Gold revenue price of US$3,000/oz used in calculation of royalty costs.
2
All-In Sustaining Costs is based on per ounce produced and include cash costs plus sustaining capital. Page 25 of 90
Next Steps The Company continues to progress environmental baseline monitoring and studies to support the Environmental Assessment submission scheduled for Q3 March FY27. In parallel, engagement with First Nations, local communities and regulatory authorities has been significantly advanced to align stakeholders and to support an efficient approvals process. The Feasibility Study is now underway and accelerated to now be finalised in Q3 March FY27 with Final Investment Decision targeted for Q4 June FY27. Project development timelines and milestones are shown in Figure 14 inclusive of the Touquoy Restart. Figure 14: Indicative Project Development Timeline for 15-Mile Processing Hub Project and Touquoy Restart
Authorised by Andrew Strelein Managing Director and CEO
━━━━━━
Investor presentation – Mining Forum Americas September 2026
2
Disclaimer This presentation has been prepared by St Barbara Limited (“Company”). The material contained in this presentation is summary information for general information purposes only. This presentation is not investment advice, nor is it an offer or invitation for subscription or purchase of, or a recommendation in relation to, securities in the Company and neither this presentation nor anything contained in it shall form the basis of any contract or commitment. This presentation contains forward-looking statements that are subject to risk factors associated with exploring for, developing, mining, processing, the sale of gold, trading markets and completion of acquisitions. Forward-looking statements include those containing such words as anticipate, estimates, forecasts, should, will, expects, plans, production guidance or similar expressions. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the Company, and which could cause actual results or trends to differ materially from those expressed in this presentation. Actual results may vary from the information in this presentation. The Company does not make, and this presentation should not be relied upon, any representation or warranty as to the accuracy, or reasonableness, of such statements or assumptions. Investors are cautioned not to place undue reliance on such statements. The statements, opinions, and estimates in this presentation are subject to change without notice and may be subject to rounding, as are statements about market and industry data, projections and guidance estimates. The Company undertakes no obligation to update publicly or release any revisions to these forward-looking statements. This presentation has been prepared by the Company as a summary based on information available to it, including information from third parties, and has not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. To the maximum extent permitted by law, neither the Company, their directors, employees or agents, advisers, nor any other person accepts any liability, including, without limitation, any liability arising from fault or negligence on the part of any of them or any other person, for any loss arising from the use of this presentation or its contents or otherwise arising in connection with it. Non-IFRS Measures: The Company's results are reported under the International Financial Reporting Standards (“IFRS”). This presentation includes certain non-IFRS financial measures, including cash operating costs, to provide a greater understanding of the Company operations. These measures:
- may be calculated differently by other companies and should not be used for comparison; and
- should be used in addition to, and not as a replacement for measures prepared in accordance with IFRS.
Financial figures are in Australian dollars unless otherwise noted. Financial year is 1 July to 30 June. This presentation is not audited.
Australian Securities Exchange (ASX) Listing code “SBM”
3
Disclaimer JORC Code It is a requirement of the ASX Listing Rules that the reporting of exploration results and mineral resources in Australia comply with the 2012 edition of the Joint Ore Reserves Committee’s Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Investors outside Australia should note that while mineral resource estimates of St Barbara in this Presentation comply with the JORC Code (such JORC Code mineral resources being Mineral Resources), they may not comply with the relevant guidelines in other countries and, in particular, do not comply with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the Canadian NI 43-101 Standards); or (ii) Item 1300 of Regulation SK, which governs disclosures of mineral reserves in registration statements filed with the SEC. Information contained in this Presentation describing mineral deposits may not be comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian or US securities laws. You should not assume that quantities reported as “resources” will be converted to reserves under the JORC Code or any other reporting regime or that St Barbara will be able to legally and economically extract them. JORC Compliance statement The information in this presentation that relates to New Simberi’s Mineral Resources and Ore Reserves is extracted from the report titled ‘Q3 March FY26 Quarterly Report’ released to the ASX on 29 April 2026. Atlantic’s Mineral Resources is extracted from the report titled ‘15-Mile Processing Hub Mineral Resources Estimate Increases 24% to 2.5 Moz’ released to the ASX on 28 July 2026 and Ore Reserves is extracted from the report titled ‘15-Mile Processing Hub Project PFS Updated” released to the ASX on 28 September 2026. These reports are available to view at www.stbarbara.com.au and www.asx.com.au, and for which Competent Persons’ consents were obtained. St Barbara confirms that it is not aware of any new information or data that materially affects the information included in the Original Reports and that all material assumptions and technical parameters underpinning the Mineral Resources and Ore Reserves estimates in the Original Reports continue to apply and have not materially changed. St Barbara confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the Original Reports and that each Competent Person’s consent remains in place for subsequent releases by St Barbara of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompany consent.
01
Corporate Overview
5
Corporate Summary Capital Structure Shares on issue (ASX: SBM)
Shareholders3 1,226.1M
Performance rights
69.5M
Share price1
A$0.82
Market capitalisation1
A$1,043M
Cash2
A$427M
Debt
Nil
Hedging
Nil
Equity investment in Geopacific Resources (ASX:GPR) – 14.3%1
Institutional (60%) Retail (32%) Other (8%) Substantial Shareholders
- Paradice (6.9%)
- Vanguard (5.7%)
- Baker Steel (5.2%
Broker Coverage
A$16M
Note: 1. Based on ASX closing prices as at 25 September 2026; 2. Includes unaudited cash balance as at 31 August 2026 of A$427m. Includes restricted cash of A$81 million for the Atlantic rehabilitation bond at AUD/CAD of 0.98; 3. As at 15 September 2026.
6
Simberi Sale Transaction Summary St Barbara to divest its remaining 40% interest in the New Simberi Gold Project to Lingbao Gold for A$453m cash PLUS royalties
TOTAL CONSIDERATION A$453 million cash PLUS royalties ► A$410m cash payment on completion ► A$43m repayment of St Barbara’s share of funding to New Simberi between April and signing
TRANSACTION STRUCTURE 40% sale of New Simberi ► Sale of St Barbara’s remaining 50% of Tabar Island Holdings (joint owned entity owning 80% of New Simberi and 100% of Tabar Islands ELs)
► 2.75% NSR on gold and silver from New Simberi and 1.5% NSR on the Tabar Islands ELs
► St Barbara’s share of ongoing cash calls related to New Simberi to be funded by Lingbao from signing to completion
FULLY FRANKED DIVIDENDS A$0.13 per share
CONDITIONS PRECEDENT Regulatory & shareholder
ROYALTY PORTFOLIO 2.75% & 1.5% NSR ► 2.75% NSR on 100% future gold and silver production from New Simberi ► 1.5% NSR on all future minerals from Tabar Island Exploration Licenses ► Both royalties guaranteed by Lingbao listed entity
TIMING March Quarter FY27
► Board will consider declaring a special A$0.13 per share fully franked dividend at completion
► PRC and PNG regulatory approvals
► Completion targeted for Q3 March FY27
► This would be in addition to the fully franked dividend of A$0.05 per share declared on 28 August
► SBM shareholder approval where required
► Post-completion: royalty portfolio strategic review
► Lingbao shareholder approval
► Board has also reconfirmed that an on-market share buy-back of up to 100m shares is being considered
► No material adverse event
Note: Refer to ASX announcement on 10 September 2026 titled “St Barbara to Sell Simberi Interest to Lingbao”
7
St Barbara management team
Andrew Strelein
Sara Prendergast
Phil Stephenson
Brett Ascott
Kylie Panckhurst
Roger Mustard
David Cotterell
Managing Director & CEO
Chief Financial Officer
Operations Advisor
EGM Projects & Technical Support EGM Projects and Technical Support since July 2023.
General Counsel & Company Secretary General Counsel and Company Secretary since September 2023.
EGM Exploration
GM Business Development & Investor Relations GM Business Development and Investor Relations since July 2023.
Managing Director & CEO since July 2023.
Chief Financial Officer since September 2023.
Operations Advisor since February 2025.
Highly experienced mining executive with extensive global experience in leadership roles across a number of mining jurisdictions including Australia, Indonesia, Africa and North America with Newmont, Euronimba and earlier with Normandy.
Over 20 years’ finance experience in multinational listed mining companies across a range of commodities including Nickel, Gold, Copper, Uranium and Zinc with Gold Fields, Minara Resources, Xstrata, BHP Billiton, Glencore, Downer, and Orica.
Extensive global mining experience, including PNG (Lihir and Porgera), Australia, Indonesia and North America, in senior management and executive leadership roles with Newcrest, Newmont, Barrick and Placer Dome.
Extensive experience in incorporated and unincorporated joint ventures including KCGM, Boddington, Euronimba, gold refineries and power stations.
Experience with joint ventures including KCGM.
Over 30 years of industry experience across Australia, Indonesia and West Africa in senior technical management roles covering geology, geotechnical engineering, mining engineering, business and strategic planning, project management, studies and business development.
Over 15 years’ experience as a corporate and commercial lawyer across various industries. Executed transactions and supported projects in Africa, the Americas, Asia-Pacific and Europe for both public and private sector clients.
EGM Exploration since July 2023. Over 30 years of gold exploration experience across Asia-Pacific and North America in technical and senior technical management roles with Dominion Mining, Ross Mining, Auzex Resources and Oceana Gold Corporation.
25 years’ mining and global financial markets experience across geology, equities research, investor relations and business development.
02
Capital Management outlook
9
Pro forma cash position Cash build up (A$m)
Key takeaways
453
880
• Existing cash balance of A$427m to result in pro-forma cash balance of A$880m1
427
• Potential for more cash realisation following royalty portfolio strategic review
Reflects cash consideration (A$410m) and capital reimbursement (A$43m)
Current cash balance
• St Barbara to receive A$410m in upfront cash from Lingbao and A$43m capital reimbursement from expenditure on the New Simberi Gold Project from April until signing ‒ As at 31 August this was A$43m
Proceeds
Pro forma
(As at 31 August 2026)
Refer to ASX announcement on 10 September 2026 titled “Remaining New Simberi Interest to be sold to Lingbao” 1. Includes unaudited cash balance (including restricted cash) as at 31 August 2026 of A$427m, cash proceeds from the transaction (A$410m) and loan repayments from Lingbao (A$43m). Excludes listed investments.
10
Fully Franked Dividends • Following the transaction, St Barbara is considering full distribution of franking credits with total of A$221m to shareholders, consisting of
Fully franked dividend payment capacity (A$m)
159
221
A$0.13ps dividend (Expected1)
Total dividend returns
- A$0.05 per share dividend declared on 28 August
- Fully franked dividend of A$0.13 per share to be considered following completion of the transaction
Potential share buy-back of up to 100m shares on issue following the 15-Mile Processing Hub Pre-Feasibility Study due at the end of September 2026
61
A$0.05ps dividend (Declared on 28 August 2026)
Notes. 1,226 million shares on issues as at 8 September 2026. 1. Fully franked dividend to be considered by the St Barbara board following completion of the transaction
03
Business overview
12
Overview of Nova Scotia Projects Integrated Operation with 15-Mile Processing Hub Project
Nova Scotia Projects comprise: Touquoy Restart:
1
• To produce gold from the processing of existing stockpiles through the existing Touquoy processing plant
15-Mile Mine:
2a
• Four simple low strip ratio open pits (Egerton-Maclean, Plenty, Hudson & 149) providing baseline feed to the relocated Touquoy mill
Old Mitchell Mine:
2b
• Redesigned as a satellite deposit with ore mining and haulage ~72 km to 15Mile commencing in year 3
Old Austen Mine:
2c
• Low capital, satellite deposit introduced in year 4 of the mine plan with ore mining and haulage ~64 km to 15-Mile
13
Nova Scotia management team and key personnel Strong management team, with key personnel having years of experience in the region
Craig Hudson P. Eng Executive Vice President, Atlantic Appointed EVP Atlantic in May 2026. Formerly GM Atlantic Projects from 2024. Initial appointment with Atlantic Gold in 2017 to lead construction and commissioning of Touquoy. Over 15 years experience in gold mining sector, both internationally and in Canada. Experience with Barrick, Newmont and Ausenco specialising on project studies, consulting, commissioning and operations.
Andrew Taylor P. Eng Andrew Taylor P. Eng VP Operations
Dustin O'Leary
Vice President Operations
Manager Business Development
Appointed VP Atlantic Operations in late 2023. Formerly GM Operations from 2021 after stint as Manager Processing at Touquoy.
Over 20 years of experience in the Canadian Mining Sector including with Inco/Vale in a variety of engineering, metallurgical and supervisory roles.
Appointed Manager Business Development in 2025. Formerly Manager Communications and leading government engagement. Over 20 years of experience government engagement, marketing and communications. Previously worked for the Halifax Regional Municipality as Promotions and Research Coordinator for 8 years. Awarded Queens Platinum Jubilee Medal for service to the Province of Nova Scotia.
Jennifer Adshade
Melissa Nicholson
Manager Community and First Nations
Environment Manager
Appointed Community & Indigenous Engagement Manager. Formerly with Atlantic in other senior permitting / engagement since roles 2018. Has worked as an Environmental Professional for over 15 years in Canada.
Appointed Environment Manager in 2022. With Atlantic since 2018. 13 years of environmental Contaminated Sites Assessment and Remediation experience as a 3rd party consultant. 7 years of experience in the Canadian gold mining sector
Adam Guignard Manager - Processing Appointed Manager Processing in 2021 and presently overseeing Touquoy since closure. Initial appointment with Atlantic Gold in 2017 to lead commissioning of Touquoy. 17 years of experience in the Canadian gold mining sector. Worked at seven different gold mines; commissioned five gold processing plants, including two as the lead and one as the signing authority.
14
Project status
Touquoy Restart
Following the New Simberi sale, St Barbara will be a Nova Scotia focused developer, with near term production at Touquoy Restart while progressing development activities at the 15-Mile Processing Hub
Touquoy Restart PFS completed Operating cash flow at US$4,000/oz anticipated at C$118m with 38koz gold production over a 13-month operation
Touquoy Restart permits approved Nova Scotia Environment and Climate Change approved amendments to Industrial Approval permit conditions
15-Mile
15-Mile Processing Hub Project updated PFS completed Long-term average gold production >100kozpa across an 13+ year mine life
Exploration pipeline bolstered Pipeline strengthened via regional EL acquisitions and prioritisation of key exploration targets
15
Upcoming Milestones
Touquoy Restart
Following the New Simberi sale, St Barbara will be a Nova Scotia focused developer, with near term production at Touquoy Restart while progressing development activities at the 15-Mile Processing Hub
Q4 CY26
Touquoy Restart production Restart of ore processing at the Touquoy plant by end of calendar year 2026 — first ore, first cash flow from restart, and validation of the low-capital project
IAAC determination
15-Mile
15-Mile is expected to receive the Section 16 determination under the Impact Assessment Act, removing the requirement for a parallel federal impact assessment
FY27
15-Mile Processing Hub Project FS and FID Feasibility Study completion targeted for March quarter 2027, with FID in June 2027 Submission of Environmental and Social Impact Assessment trigger documents over FY26/27 in parallel with Feasibility Study
16
Nova Scotia Projects Timeline 15-Mile Processing Hub FID targeted by end of FY27, with production targeted to commence in FY30 Touquoy Restart
FY 2027 Dec
FY 2028 Jun
Dec
FY 2029 Jun
Dec
FY 2030 Jun
Permitting, re-commissioning mill and construction of in-pit tailings Touquoy production 15-Mile Processing Hub Environmental Impact Assessment 1 Pre-Feasibility Study (Update) Feasibility Study Final Investment Decision Industrial Approval & Other permits Detailed Engineering Site construction Works Commissioning/ Operations The above dates are indicative only and the Company reserves the right to vary the timeline at any time without notice, subject to the ASX Listing Rules and the Corporations Act and other applicable laws. Note: 1. Assumes consolidated Environmental Impact Assessment for 15-Mile, Old Austen Mine and Old Mitchell Mine
Dec
Jun
17
Updated PFS Highlights Updated PFS delivers a larger Ore Reserve, longer mine life and materially enhanced economics versus the January 2026 study
1.44 Moz
13 years
1,377 koz
1,098 US$/oz
1,705 A$m
81.6 %
ORE RESERVES +17%
MINE LIFE
LOM GOLD PRODUCED
LOM AISC
POST-TAX NPV5
POST-TAX IRR
Bigger, longer-life orebody • Ore Reserves up 17% to 1.44 Moz of contained gold • Mine life extended to 13 years on Proven & Probable Reserves only • Underpinned by an updated 2.5 Moz Mineral Resource
Enhanced, low-cost production
Compelling economics
• LOM gold production up 203 koz to 1,377 koz recovered
• Post-tax NPV5 of A$1,705m and 81.6% IRR at US$3,000/oz gold
• Above 120 koz per annum in FY31 and FY32; 106 koz pa average
• Post-tax NPV5 of A$2,721 million and IRR of 121.4% at US$4,000/oz gold
• LOM AISC of US$1,098/oz on a low 2.8:1 strip ratio
• ~21% NPV uplift versus the January 2026 PFS • De-risked initial capital of C$289m (A$315m) • Feasibility Study accelerated to Q3 March FY27; FID targeted Q4 June FY27
Source: ASX release on 28 September 2026 titled “15-Mile Processing Hub Project PFS Updated”,. Economics are post-tax at a gold price of US$3,000/oz and C$1.00 = US$0.71 / A$1.09; initial capital to +/-25% AACE Class 4 accuracy.
18
Nova Scotia Projects – Touquoy Restart and 15-Mile Hub Nova Scotia Projects Production Nova Scotia Projects Production vs AISC1 vs AISC 1
1 1 Growth and Initial Capital (US$m) Growth Capital (US$m)
150
250
2,000
Initial Capital
Expansion Capital
133 125
98
96
100
95
96
100
104
102
107
106
105
Gold Production (koz)
1,200 75 800 50
25
205
1,600
112
200
All-in Sustaining costs (US$/oz)
125
150
100 74
400 19
19 50
46
FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 FY35 FY36 FY37 FY38 FY39 FY40 FY41 FY42 Touquoy Stockpiles
15-Mile
Old Mitchell
Old Austen
All-in Sustaining Cost (US$/oz) FY29
FY30
FY31
Note: 1. Refer to ASX announcement on 28 September 2026 titled “15-Mile Processing Hub Project PFS Updated”; 15-Mile Processing Hub Pre-Feasibility Study uses US$3,000 gold price and CAD/USD of 0.71
FY32
FY33
19
Touquoy Restart Project Overview Project Details1 •
Nova Scotia Projects
1
Key Metrics
Touquoy Restart Study results1 outlined a near-term, low capital and low-cost restart ‒ Initial capital of C$11.4m ‒ Estimated gold production of 38koz over a 13-month period ‒ Average All-in Sustaining Cost of US$1,598/oz
Processing life
1.1 years
Total Mill Feed Tonnes
3.0 Mt
Average Mill Feed Gold Grade
0.4 g/t
Total Contained Gold
43 koz
•
Touquoy Restart opportunity provides near-term additional upside for Atlantic with minimal capital spend
•
On 13 April 2026, the NSECC approved amendments to the Industrial Approval permit conditions for the Touquoy Restart
•
On 24 April FID was approved and two major contracts signed
Total Recovered Gold
38 koz
•
Preparation for the in-pit tailings deposition system is underway and material movement activities have already commenced on the ore and waste stockpiles
Average Gold Recovery
88%
Cash cost
US$1,430 – 1,630/oz
AISC
US$1,500 – 1,700/oz
Project Initial capex
US$7-9m
•
Touquoy Restart is anticipated to recommence ore processing by the end of calendar year 2026
Project Highlights
38 koz
88%
RECOVERED GOLD
GOLD RECOVERY
US$1,598/oz Avg. AISC
- Refer to ASX announcement on 20 April 2026 titled “Updated Group Production and Cost Outlook“
20
15-Mile Processing Hub Project Overview
Nova Scotia Projects
2
Project Details1
Key Metrics
•
Total waste mined
109.2 Mt
Average Strip Ratio
2.82 w:o
Operational years
FY30 – FY42
Total Mill Feed
38.7 Mt
Average Mill Feed Grade
1.16 g/t
Average Gold Recovery
95.8%
Total contained gold
1.4 Moz
Mining costs
C$18.0/t milled
Mining Feed Transport
C$5.1/t milled
Processing costs
C$10.6/t milled
G&A costs
C$5.6/t milled
Initial capex
C$289m
Sustaining capex LOM
C$234m
•
The Updated PFS leverages the PFS completed in January 2026 with updated resource models and associated changes to mine design, pit sequencing, stockpiles and other infrastructure The updated PFS confirmed project with production over 100kozpa across a 13 year mine life ‒ 15-Mile Mine contains 4 open pits with Ore Reserves of 860koz ‒ Old Mitchell Mine contains 1 open pit with Ore Reserves of 340koz ‒ Old Austen Mine contains 1 open pit with Ore Reserves of 240koz
•
Gold is free-milling with high recovery from conventional gravity & Carbon-in-Leach (CIL) methods at relatively coarse grind size
•
Processing Hub includes 3 stage crushing, ball mill, gravity, CIL, cyanide detox with conventional tailings
‒ Reuses the majority of the Touquoy Process Plant •
Project phases include 1) 1 year construction, 2) 13 years operation
•
Mineral Resources Estimate now expanded by 24% to 2.5Moz Au
•
Ore Reserves increased by 17% to 1.4 Moz following incorporation of expanded Mineral Resources Estimate
Note: 1. Refer to ASX announcement on 28 September 2026 titled “15-Mile Processing Hub Project PFS Updated”; 15-Mile Processing Hub Pre-Feasibility Study uses US$3,000 gold price and CAD/USD of 0.71
3
4
21
Nova Scotia Exploration – 15-Mile Processing Hub Exploration Pipeline 15-Mile Processing Hub Exploration Pipeline, Nova Scotia, Canada
• 46 exploration targets within 75 km of the proposed 15-Mile Processing Hub Project ranging from: ‒ Stage A (conceptual target) ‒ Stage B1 (drill target) ‒ Stage B2 (advance drill target) ‒ Stage C (resource definition) ‒ Stage D (Feasibility Study level) and ‒ Stage E (Mining Operation) • FY27 work programs are highlighted for: o surface sampling o geophysical surveys or reprocessing / 3D modelling, and o RC drilling
22
Nova Scotia Exploration - 15-Mile Processing Hub Exploration Pipeline 46 exploration targets within 75 km of the proposed 15-Mile Processing Hub Project
23
Nova Scotia Exploration Acceleration - Old Austen Mine Down-Plunge Old Austen Mine Down-Plunge Prospect and along strike at the Mill Shaft West Prospect have been prioritised1
Note: 1. Refer to ASX announcement on 28 September 2026 titled “Nova Scotia Exploration Acceleration Update”
A Appendix
25
Atlantic Gold Ore Reserves Proved
Probable
Total
Deposit
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
15-Mile Mine
23.6
1.1
860
23.6
1.1
860
Old Mitchell Mine
8.1
1.1
290
1.6
1.0
50
9.6
1.1
340
Old Austen Mine
4.1
1.3
170
1.4
1.6
70
5.5
1.3
240
Touquoy Stockpiles
3.0
0.4
40
3.0
0.4
40
Total Atlantic
15.2
1.2
500
26.6
1.2
980
41.7
1.1
1,480
Note: Gold Ore Reserves – 100% basis for Atlantic. Atlantic Ore Reserves are extracted from the report titled “15-Mile Pre-Feasibility Study and Ore Reserve Update”. released to the ASX on 28 September 2026. 1.
Ore Reserves are based on a gold price of: Atlantic (US$2,000/oz for 15-Mile Mine, Old Mitchell Mine and Old Austen Mine, and US$3,000/oz for Touquoy stockpiles)
Cut-off grades: Atlantic Mining (0.3 g/t Au for 15-Mile Mine, 0.4g/t Au for Old Mitchell Mine and Old Austen Mine and 0.23g/t for Touquoy stockpiles).
Mineral Resources are reported inclusive of Ore Reserves.
Rounding may result in apparent summation differences between tonnes, grade and contained metal.
26
Atlantic Gold Mineral Resources Measured
Indicated
Inferred
Total
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
30.2
1.2
1,190
5.5
1.1
200
35.7
1.2
1,390
Old Mitchell Mine
13.2
1.2
510
3.3
1.4
150
16.5
1.2
660
Old Austen Mine
4.4
1.4
190
5.2
1.4
230
0.6
1.9
40
10.2
1.4
460
Total Atlantic
17.6
1.2
700
38.7
1.3
1,570
6.1
1.2
240
62.4
1.2
2,510
Deposit 15-Mile Mine
Note: Gold Mineral Resources – 100% basis for Atlantic. Atlantic Mineral Resource Estimates are extracted from the report titled ‘15-Mile Processing Hub Mineral Resources Estimate Increases 24% to 2.5 Moz’ released to the ASX on 28 July 2026.
Mineral Resources are reported inclusive of Ore Reserves.
Cut-off Grades Atlantic Operations (0.3 g/t Au)
All Mineral Resources are reported constrained by a US$2,500/oz pit shell.
Rounding may result in apparent summation differences between tonnes, grade and contained metal.
27
Simberi Gold Ore Reserves Proved
Probable
Total
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Simberi Oxide
4.6
1.1
160
2.1
1.1
75
6.6
1.1
235
Simberi Sulphide
5.0
2.1
330
10.3
2.1
680
15.3
2.1
1,010
Simberi Stockpile
0.8
1.3
30
0.8
1.3
30
Total Simberi
10.3
1.6
520
12.3
1.9
755
22.6
1.8
1,275
Deposit
Note: Gold Ore Reserves – 50% Attributable basis for Simberi.
Ore Reserve estimates are extracted from the report titled ‘Q3 March FY26 Quarterly Report’ released to the ASX on 29 April 2026. 1.
Ore Reserves are based on a gold price of: Simberi (US$2,000/oz Au)
Cut-off grades: Simberi based on a $0/t net revenue, including gold revenue.
Mineral Resources are reported inclusive of Ore Reserves.
Rounding may result in apparent summation differences between tonnes, grade and contained metal.
28
Simberi Gold Mineral Resources Measured
Indicated
Inferred
Total
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Au)
Ounces (000’s)
Simberi Oxide
6.5
1.0
210
7.5
1.2
290
1.5
0.9
45
15.4
1.1
545
Simberi Sulphide
13.7
1.4
615
35.6
1.4
1,600
2.5
1.2
95
51.7
1.4
2,310
Simberi Stockpile
0.8
1.3
30
0.8
1.3
30
Total Simberi
20.9
1.3
855
43.0
1.4
3.9
1.1
140
67.8
1.3
2,885
Deposit
1,890
Note: Gold Mineral Resources – 50% Attributable basis for Simberi.
Simberi Mineral Resource Estimates are extracted from the report titled ‘Q3 March FY26 Quarterly Report’ released to the ASX on 29 April 2026. 1.
Mineral Resources are reported inclusive of Ore Reserves.
Cut-off Grades Simberi Oxide (0.4 g/t Au), Simberi Sulphide (0.6 g/t Au)
All Mineral Resources are reported constrained by a US$2,500/oz pit shell.
Rounding may result in apparent summation differences between tonnes, grade and contained metal.
29
Simberi Silver Ore Reserves Proved
Probable
Total
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Simberi Oxide
4.6
1.6
230
2.1
2.3
155
6.6
1.8
380
Simberi Sulphide
5.0
3.0
490
10.3
4.7
1,555
15.3
4.2
2,045
Total Simberi
9.6
2.3
720
12.3
4.3
1,710
21.9
3.5
2,425
Deposit
Note: Silver Ore Reserves – 50% Attributable basis for Simberi. Ore Reserve estimates are extracted from the report titled ‘Q3 March FY26 Quarterly Report’ released to the ASX on 29 April 2026. 1.
Ore Reserves are based on a silver price of US$20/oz Ag.
Cut-off grades: Simberi based on a $0/t net revenue, including silver revenue.
Mineral Resources are reported inclusive of Ore Reserves.
Rounding may result in apparent summation differences between tonnes, grade and contained metal.
30
Simberi Silver Mineral Resources Measured
Indicated
Inferred
Total
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Tonnes (Mt)
Grade (g/t Ag)
Ounces (000’s)
Simberi Oxide
6.5
2.2
460
7.5
4.1
985
1.5
2.4
115
15.4
3.2
1,560
Simberi Sulphide
13.7
2.8
1,225
35.6
4.1
4,685
2.5
1.9
150
51.7
3.6
6,060
Total Simberi
20.2
2.6
1,685
43.0
4.1
5,670
3.9
2.1
265
67.1
3.5
7,620
Deposit
Note: Silver Mineral Resources – 50% Attributable basis for Simberi. Mineral Resource Estimates are extracted from the report titled ‘Q3 March FY26 Quarterly Report’ released to the ASX on 29 April 2026. 1.
Mineral Resources are reported inclusive of Ore Reserves.
Cut-off Grades Simberi Oxide (0.4 g/t Au), Simberi Sulphide (0.6 g/t Au).
All Mineral Resources are reported constrained by a US$2,500/oz pit shell.
Rounding may result in apparent summation differences between tonnes, grade and contained metal.
31
Highlights •
St Barbara Limited (“St Barbara” or “the Company”) has signed a binding agreement to sell its remaining interest 1 in the New Simberi Gold Project (“New Simberi”) to Lingbao Gold Group (“Lingbao”) (the “Transaction”). On completion of the Transaction St Barbara is to receive the following: o
A$410 million in cash,
o
A$43 million cash repayment representing St Barbara’s share of construction capital for New Simberi between April 2026 and signing of the binding agreement, with Lingbao to also fund St Barbara’s share of New Simberi capital requirements from signing to completion,
o
2.75% net smelter return royalty on 100% of future gold and silver production from New Simberi (“Simberi NSR”), and
o
1.5% net smelter return royalty on 100% of future minerals production from the Tabar Island Group exploration licences (“Tabar Islands NSR”).
•
The Transaction is targeted to complete in the March quarter 2027, subject to a number of conditions precedent.
•
On completion of the Transaction, St Barbara’s pro-forma assets are expected to comprise: o
Cash position of approximately A$880 million 2,
o
15-Mile Processing Hub Project and exploration portfolio,
o
Touquoy Restart Project,
o
Royalty Portfolio including Simberi NSR and Tabar Islands NSR royalties, and
o
No debt or hedging.
St Barbara Limited (“St Barbara” or the “Company”) (ASX: SBM) is pleased to announce it has signed an agreement with Lingbao Gold Group (“Lingbao”), by which Lingbao will acquire St Barbara’s remaining ownership in Tabar Islands Holdings Pty Ltd (“Tabar Islands Holdings”), which currently owns 100% of New Simberi and the Tabar Islands Exploration Licenses ("Exploration Licences"). As announced on 10 December 2025, Simberi Gold Company Limited (a wholly owned subsidiary of Tabar Islands Holdings) agreed to sell a 20% interest in New Simberi to Eda Minerals Limited (a wholly owned subsidiary of Kumul Mineral Holdings Ltd) (“Kumul”) for A$100 million to form the New Simberi Gold Joint Venture. Once the transaction with Kumul completes, the A$100 million purchase price and Kumul’s share of capital expenditure will be repaid from the future sales from the New Simberi Gold Joint Venture.
1
St Barbara currently holds a 50% interest in New Simberi, subject to completion of the transaction with Kumul Mineral Holdings Ltd as announced on 10 December 2025, after which St Barbara will hold a 40% attributable interest in New Simberi.
2
Includes cash proceeds from the Transaction, loan repayments from Lingbao, existing cash and restricted cash as at 31 August 2026. Excludes listed investments.
St Barbara Limited ABN 36 009 165 066 Level 19, 58 Mounts Bay Road, Perth WA 6000 PO Box 1161, West Perth WA 6872 T +61 8 9476 5555 stbarbara.com.au
ASX: SBM
Transaction details Key elements of the Transaction include the following: •
Sale structure – St Barbara to sell its remaining interest in Tabar Islands Holdings to Lingbao.
•
Cash proceeds to St Barbara – St Barbara will receive A$453 million in cash, comprising A$410 million cash consideration and cash repayment of ~A$43 million representing St Barbara’s funding of construction capital to Tabar Islands Holdings between April 2026 and signing.
•
Lingbao loan to fund cash calls – Lingbao to fund St Barbara's share of capital requirements from Tabar Islands Holdings until completion. In the event the Transaction does not reach completion due to a nonsatisfaction of one or more specified conditions precedent by Lingbao, the funding becomes a construction loan from Lingbao that is repayable by St Barbara with a single bullet payment 24 months after the Transaction is terminated. In other situations, should the Transaction not reach completion the funding will be repayable by St Barbara in not less than 30 days.
•
Royalties – On completion, Lingbao will grant St Barbara a 2.75% Simberi NSR royalty on 100% of gold and silver produced from New Simberi and a 1.5% Tabar Islands NSR royalty on 100% of all minerals produced from the Exploration Licenses.
•
Conditions Precedent – completion of the Transaction is subject to satisfaction (or waiver, as applicable) of conditions precedent, including (amongst others):
• •
o
People's Republic of China and Papua New Guinea (PNG) regulatory approvals;
o
St Barbara shareholder approval via simple majority of votes (however if a shareholder vote is not required under the ASX Listing Rules, this condition may be waived by St Barbara at its discretion); and
o
Lingbao shareholder approval (however if a shareholder vote is not required under the HKEX Listing Rules, this condition may be waived by Lingbao at its discretion).
Material Adverse Event – Lingbao may terminate the Transaction if a material adverse event occurs before completion. Warranties – Customary title and capacity warranties have been given by St Barbara which are subject to a customary limitation of liability regime and an indemnity for the existing PNG tax reassessment matter where St Barbara will maintain carriage of the discussions with the Internal Revenue Commission.
St Barbara Limited Managing Director and CEO Andrew Strelein said: “This transaction will crystallise substantial value for St Barbara shareholders and allows the Company to focus on the development of the Nova Scotia gold projects and the attractive exploration portfolio surrounding the 15-Mile Processing Hub. The Company’s interest in New Simberi has never been fully reflected in the Company’s share price and this transaction resolves that situation at a logical point for Lingbao to take full control of New Simberi.” “St Barbara recognises that New Simberi is an outstanding development project and looks forward to participating in the future benefits via the royalties over New Simberi’s production, and through exploration of the Tabar Islands licenses, whilst offering St Barbara the option to consider opportunities to realise the value of its royalty portfolio.” “Subject to completion of the transaction, the Board will consider a further fully franked dividend of approximately A$0.13 per share – on top of the fully franked A$0.05 per share already declared. The Board reconfirms that it will also be considering a decision to execute an on-market share buy-back of up to 100 million shares after the release of the updated Pre-Feasibility Study for the 15-Mile Processing Hub Project due later this month.”
Strategic rationale for the divestment The Transaction crystallises material value for shareholders from New Simberi and enables St Barbara to simplify the organisation to focus on progressing development of the Nova Scotia Gold Projects. The Transaction: •
streamlines the portfolio and enables St Barbara to focus the business on the Nova Scotia Gold Projects, with the Touquoy Restart planned to commence by December 2026;
•
enables the St Barbara Board, upon completion, to consider a potential A$0.13 per share fully franked special dividend; and;
•
provides St Barbara with ongoing exposure to New Simberi and the Exploration Licences via the 2.75% New Simberi NSR and 1.5% Tabar Islands NSR royalties respectively, whilst offering St Barbara the option to consider opportunities to realise the value of its royalty portfolio.
New Simberi and Tabar Islands Royalties Following completion of the Transaction, St Barbara will hold the following royalties: •
2.75% Simberi NSR on 100% of gold and silver produced from the New Simberi Gold Project; and
•
a 1.5% Tabar Islands NSR on 100% of all minerals produced from the Exploration Licenses.
The royalties will commence on 1 July 2027 and Lingbao is providing a parent company guarantee in respect of its royalty payment obligations. Royalty Net Present Value (NPV) analysis Based on the Initial Life of Mine Plan 1, New Simberi is forecast to produce a total of 2.2 Moz (2.0 Moz payable) of gold over an initial 13-year mine life. At a discount rate of 5.0% and gold price assumption of US$4,000/oz, the New Simberi royalty has an NPV of A$212 million. Table 1 below shows an NPV sensitivity analysis of the New Simberi NSR royalty at various discount rates and gold price assumptions.
Table 1: New Simberi royalty NPV analysis (A$m) Gold price assumption (US$/oz)
Discount Rate (%)
US$3,000/oz
US$3,500/oz
US$4,000/oz
US$4,500/oz
US$5,000/oz
3.0%
176
207
237
268
299
4.0%
166
195
224
253
282
5.0%
156
184
212
239
267
Note. Assumes AUD to USD exchange rate of 0.70. Based on New Simberi Initial Life of Mine Plan. Refer to ASX announcement on 20 April 2026 titled “Updated Group Production and Cost Outlook”. St Barbara confirms that all material assumptions underpinning the production targets in that announcement continue to apply and have not materially changed.
1
Refer to ASX announcement on 20 April 2026 titled “Updated Group Production and Cost Outlook”
Figure 1: New Simberi estimated annual royalty cash flows (A$m) Units 2027 2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039 2040
Gold production
Koz
72
101
181
195
216
232
204
182
177
98
80
118
56
23
Silver production
Koz
147
89
32
209
247
360
579
455
478
96
166
108
32
3,044
Gold selling costs
US$m (1.5)
(7.9)
(57.6) (62.1)
(69.0)
(73.7)
(64.8) (57.8) (58.2) (56.5) (53.5) (14.8) (1.2)
(0.5)
Silver selling US$m (0.1) costs
(0.1)
(0.0)
(0.1)
(0.1)
(0.2)
(0.3)
(0.3)
(0.3)
(0.1)
(0.1)
(0.1)
(0.0)
(1.7)
NSR
A$m
404
565
957
1,036
1,149
1,238
1,099
980
954
505
396
657
316
130
Royalty cash flows
A$m 11.1
15.5
26.3
28.5
31.6
34.1
30.2
26.9
26.2
13.9
10.9
18.1
8.7
3.6
Note. Royalty cash flows based on New Simberi Initial Life of Mine Plan, Refer to ASX announcement on 20 April 2026 titled “Updated Group Production and Cost Outlook”. Based on a gold price of US$4,000/oz and silver price of US$35/oz. St Barbara confirms that all material assumptions underpinning the production target in that announcement continue to apply and have not materially changed.
Shareholder Returns Subject to and following completion of the Transaction, the Board is considering an additional fully franked special dividend of approximately A$0.13 per share. This would follow the fully franked dividend of A$0.05 per share declared on 28 August 2026. At a future date St Barbara intends to do a strategic review of its royalty interests and further consider opportunities for dividends or capital distributions. The Board reconfirms that it is considering an on-market share buy-back of up to 100 million shares, with the decision to be made after the release of the updated Pre-Feasibility Study for the 15-Mile Processing Hub Project due at the end of September 2026. Any decision to proceed with an additional dividend or the buy-back and the timing and details of such would depend on market conditions, the prevailing St Barbara share price, future capital requirements and other relevant considerations at that time. There is no guarantee that a decision will be made to proceed with any additional dividend, the buy-back or strategic review. The Company reserves the right to vary, suspend or terminate any such initiatives at any time.
Timing and next steps St Barbara and Lingbao are targeting completion of the transaction in the March quarter 2027, subject to satisfaction (or waiver, as applicable) of the conditions precedent described above.
Advisers St Barbara’s financial adviser on the transaction is Macquarie Capital (Australia) Limited, and its legal adviser is Allens. Authorised by Board of Directors
ASX: SBM · INVESTOR PRESENTATION · AUGUST 2026
━━━━━━
Investor presentation September 2026
Disclaimer This presentation has been prepared by St Barbara Limited (“Company”). The material contained in this presentation is summary information for general information purposes only. This presentation is not investment advice, nor is it an offer or invitation for subscription or purchase of, or a recommendation in relation to, securities in the Company and neither this presentation nor anything contained in it shall form the basis of any contract or commitment. This presentation contains forward-looking statements that are subject to risk factors associated with exploring for, developing, mining, processing, the sale of gold, trading markets and completion of acquisitions. Forward-looking statements include those containing such words as anticipate, estimates, forecasts, should, will, expects, plans, production guidance or similar expressions. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the Company, and which could cause actual results or trends to differ materially from those expressed in this presentation. Actual results may vary from the information in this presentation. The Company does not make, and this presentation should not be relied upon, any representation or warranty as to the accuracy, or reasonableness, of such statements or assumptions. Investors are cautioned not to place undue reliance on such statements. The statements, opinions, and estimates in this presentation are subject to change without notice and may be subject to rounding, as are statements about market and industry data, projections and guidance estimates. The Company undertakes no obligation to update publicly or release any revisions to these forward-looking statements. This presentation has been prepared by the Company as a summary based on information available to it, including information from third parties, and has not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. To the maximum extent permitted by law, neither the Company, their directors, employees or agents, advisers, nor any other person accepts any liability, including, without limitation, any liability arising from fault or negligence on the part of any of them or any other person, for any loss arising from the use of this presentation or its contents or otherwise arising in connection with it. Non-IFRS Measures: The Company's results are reported under the International Financial Reporting Standards (“IFRS”). This presentation includes certain non-IFRS financial measures, including cash operating costs, to provide a greater understanding of the Company operations. These measures:
- may be calculated differently by other companies and should not be used for comparison; and
- should be used in addition to, and not as a replacement for measures prepared in accordance with IFRS.
Financial figures are in Australian dollars unless otherwise noted. Financial year is 1 July to 30 June. This presentation is not audited.
Australian Securities Exchange (ASX) Listing code “SBM”
2
Disclaimer JORC Code
It is a requirement of the ASX Listing Rules that the reporting of exploration results and mineral resources in Australia comply with the 2012 edition of the Joint Ore Reserves Committee’s Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Investors outside Australia should note that while mineral resource estimates of St Barbara in this Presentation comply with the JORC Code (such JORC Code mineral resources being Mineral Resources), they may not comply with the relevant guidelines in other countries and, in particular, do not comply with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the Canadian NI 43-101 Standards); or (ii) Item 1300 of Regulation SK, which governs disclosures of mineral reserves in registration statements filed with the SEC. Information contained in this Presentation describing mineral deposits may not be comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian or US securities laws. You should not assume that quantities reported as “resources” will be converted to reserves under the JORC Code or any other reporting regime or that St Barbara will be able to legally and economically extract them. JORC Compliance statement The information in this presentation that relates to New Simberi’s Mineral Resources and Ore Reserves is extracted from the report titled ‘Q3 March FY26 Quarterly Report’ released to the ASX on 29 April 2026. Atlantic’s Mineral Resources is extracted from the report titled ‘15-Mile Processing Hub Mineral Resources Estimate Increases 24% to 2.5 Moz’ released to the ASX on 28 July 2026 and Ore Reserves is extracted from the report titled ‘Mineral Resources and Ore Reserves Statement as at 31 December 2025’ released to the ASX on 20 February 2026. These reports are available to view at www.stbarbara.com.au and www.asx.com.au, and for which Competent Persons’ consents were obtained. St Barbara confirms that it is not aware of any new information or data that materially affects the information included in the Original Reports and that all material assumptions and technical parameters underpinning the Mineral Resources and Ore Reserves estimates in the Original Reports continue to apply and have not materially changed. St Barbara confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the Original Reports and that each Competent Person’s consent remains in place for subsequent releases by St Barbara of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompany consent.
3
01
Transaction Overview
5
Transaction Summary St Barbara to divest its remaining interest in the New Simberi Gold Project to Lingbao Gold for A$453m cash PLUS royalties
TOTAL CONSIDERATION A$453 million cash PLUS royalties ► A$410m cash payment on completion ► A$43m repayment of St Barbara’s share of construction capital funding to New Simberi between April and signing ► 2.75% NSR on gold and silver from New Simberi and 1.5% NSR on the Tabar Islands ELs
POTENTIAL ADDITIONAL FULLY FRANKED DIVIDENDS A$0.13 per share ► Board will consider declaring a special A$0.13 per share fully franked dividend at completion ► This would be in addition to the fully franked dividend of A$0.05 per share declared on 28 August
TRANSACTION STRUCTURE Sale of interest in New Simberi ► Sale of St Barbara’s remaining interest in Tabar Islands Holdings ► St Barbara’s share of ongoing cash calls related to New Simberi to be funded by Lingbao from signing to completion
CONDITIONS PRECEDENT Regulatory & shareholder ► PRC and PNG regulatory approvals ► SBM shareholder approval if required ► Lingbao shareholder approval if required
ROYALTY PORTFOLIO 2.75% & 1.5% NSR ► 2.75% NSR on 100% future gold and silver production from New Simberi ► 1.5% NSR on all future minerals from Tabar Islands Exploration Licenses ► Both royalties guaranteed by Lingbao
TIMING March Quarter FY27 ► Completion targeted for Q3 March FY27 ► Post-completion: royalty portfolio strategic review
► Board has also reconfirmed that an on-market share buy-back of up to 100m shares is being considered
Note: Refer to ASX announcement on 10 September 2026 titled “Remaining New Simberi Interest to be sold to Lingbao”. St Barbara confirms that all material assumptions underpinning the production targets in that announcement continue to apply and have not materially changed.
Strategic Rationale Crystallises material value for shareholders and enables St Barbara to focus on its 100% owned Nova Scotia growth pipeline
01 02
Focus on 100% owned Nova Scotia growth St Barbara to shift strategic focus to Atlantic Canada including the 15-Mile Processing Hub Project and the Touquoy Restart, planned to commence by December 2026
Crystallises material value A$453m consideration for the minority stake in Simberi sees proforma St Barbara with A$880m of attributable cash post completion1 and allows board to consider a further A$0.13 per share fully franked special dividend to shareholders
03
Retained royalties & further monetisation
04
Logical partner exit
2.75% New Simberi NSR and 1.5% Tabar Islands NSR retain capex-free gold exposure; a full royalty portfolio strategic review is planned post-completion to assess additional value realisation
Lingbao Gold, a top 10 Chinese gold producer with a fully integrated exploration-to-refining platform, to take full economic control of New Simberi with existing knowledge and relationships in PNG, following its initial acquisition in April 2026
Note: Refer to ASX announcement on 10 September 2026 titled “St Barbara to Sell New Simberi Interest to Lingbao”. 1. Includes unaudited cash balance (including restricted cash) as at 31 August 2026 of A$427m, cash proceeds from the transaction (A$410m) and construction capital repayments from Lingbao (A$43m). Excludes listed investments.
6
7
Indicative Timetable Path to completion — key milestones from announcement through Q3 FY27
Transaction conditions ► PRC regulatory approvals ► PNG ICCC clearance ► Lingbao shareholder approval if required by the HKEX but otherwise may be waived by Lingbao in its discretion
Indicative timeline Sept 2026
FY27
Q2 – Q3 FY27
Announcement
Buy-back
Transaction with Lingbao announced
Potential on-market share buy-back of up to 100m shares to commence
Regulatory approvals
► St Barbara shareholder approval if required by ASX but otherwise may be waived by St Barbara in its discretion
Q1 FY27
Dividend payment Payment of A$0.05 per share fully franked dividend
Refer to ASX announcement on 10 September 2026 titled “St Barbara to Sell New Simberi Interest to Lingbao”
PRC and PNG regulatory approvals process
Q2-Q3 FY27
Shareholder Meetings St Barbara and Lingbao shareholder approvals (if required)
Q3 FY27
Completion Transaction completes
8
Valuation benchmarks favourably to recent transactions EV / Reserve (A$/oz, Au-eq) 641
638 518 368 264 100
Genesis Minerals / Lingbao Gold / Simberi OceanaGold / Ausgold Alkane Resources / Magnetic Resources Mandalay Resources
Metals Exploration / Condor Gold
Newmont (Coffee) / Fuerte
42 CMOC / Lumina Gold
Montage Gold Corp./ African Gold
EV / Resource (A$/oz, Au-eq) 282
280
266
243 153 90
68 23
OceanaGold / Ausgold Lingbao Gold / Simberi
Genesis Minerals / Magnetic Resources
Montage Gold Corp./ African Gold
Alkane Resources / Mandalay Resources
Newmont (Coffee) / Fuerte
Metals Exploration / Condor Gold
CMOC / Lumina Gold
Source: S&P CapitalIQ, company announcements select global gold development transactions over US$50m from the last 2 years (refer to Appendix). St Barbara Reserves and Resources reflect 40% attributable basis for New Simberi. AUDUSD exchange rate of 0.70. Transaction based on cash consideration of A$453m and A$212m NPV of the royalty based on New Simberi Life of Mine Plan at a 5% discount rate and US$4,000/oz gold price
02
Capital Management outlook
10
Anticipated proforma cash position upon completion Cash build up (A$m)
Key takeaways
453
880
• Existing cash balance of A$427m to result in pro forma cash balance of approximately A$880m1
427
• Potential for more cash realisation following royalty portfolio strategic review
Reflects cash consideration (A$410m) and capital reimbursement (A$43m)
Current cash balance
• St Barbara to receive A$410m in cash from Lingbao and A$43m capital reimbursement for capital expenditure on the New Simberi Gold Project from April 2026 until signing
Proceeds
Pro forma
(As at 31 August 2026)
Refer to ASX announcement on 10 September 2026 titled “St Barbara to Sell New Simberi Interest to Lingbao” 1. Includes unaudited cash balance (including restricted cash) as at 31 August 2026 of A$427m, cash proceeds from the transaction (A$410m) and construction capital repayments from Lingbao (A$43m). Excludes listed investments.
11
Potential for Further Fully Franked Dividends • Following the transaction, St Barbara will be considering distribution of fully franked dividends up to the total available of A$221m to shareholders, consisting of
Fully franked dividend payment capacity (A$m)
159
221
A$0.13ps dividend (To be considered1)
Total dividend returns
- A$0.05 per share dividend declared on 28 August
- Possible fully franked dividend of A$0.13 per share to be considered following completion of the transaction Potential share buy-back of up to 100m shares on issue following the 15-Mile Processing Hub Pre-Feasibility Study due at the end of September 2026
61
A$0.05ps dividend (Declared on 28 August 2026)
Notes. 1,226 million shares on issue as at 8 September 2026. 1. Fully franked dividend to be considered by the St Barbara board following completion of the transaction
03
Business overview
13
Overview of Nova Scotia Projects Integrated Operation with 15-Mile Processing Hub Project
Nova Scotia Projects comprise: Touquoy Restart:
1
• To produce gold from the processing of existing stockpiles through the existing Touquoy processing plant
15-Mile Mine:
2a
2b
• Four simple low strip ratio open pits (Egerton-Maclean, Plenty, Hudson & 149) providing baseline feed to the relocated Touquoy mill
Old Mitchell Mine: • Redesigned as a satellite deposit with ore mining and haulage ~72 km to 15Mile commencing in year 3
Old Austen Mine:
2c
• Low capital, satellite deposit introduced in year 4 of the mine plan with ore mining and haulage ~64 km to 15-Mile
14
St Barbara management team
Andrew Strelein
Sara Prendergast
Phil Stephenson
Brett Ascott
Kylie Panckhurst
Roger Mustard
David Cotterell
Managing Director & CEO
Chief Financial Officer
Operations Advisor
EGM Projects & Technical Support EGM Projects and Technical Support since July 2023.
General Counsel & Company Secretary General Counsel and Company Secretary since September 2023.
EGM Exploration
GM Business Development & Investor Relations
Managing Director & CEO since July 2023.
Chief Financial Officer since September 2023.
Operations Advisor since February 2025.
Highly experienced mining executive with extensive global experience in leadership roles across a number of mining jurisdictions including Australia, Indonesia, Africa and North America with Newmont, Euronimba and earlier with Normandy.
Over 20 years’ finance experience in multinational listed mining companies across a range of commodities including Nickel, Gold, Copper, Uranium and Zinc with Gold Fields, Minara Resources, Xstrata, BHP Billiton, Glencore, Downer, and Orica.
Extensive global mining experience, including PNG (Lihir and Porgera), Australia, Indonesia and North America, in senior management and executive leadership roles with Newcrest, Newmont, Barrick and Placer Dome.
Extensive experience in incorporated and unincorporated joint ventures including KCGM, Boddington, Euronimba, gold refineries and power stations.
Experience with joint ventures including KCGM.
Over 30 years of industry experience across Australia, Indonesia and West Africa in senior technical management roles covering geology, geotechnical engineering, mining engineering, business and strategic planning, project management, studies and business development.
Over 15 years’ experience as a corporate and commercial lawyer across various industries. Executed transactions and supported projects in Africa, the Americas, Asia-Pacific and Europe for both public and private sector clients.
EGM Exploration since July 2023. Over 30 years of gold exploration experience across Asia-Pacific and North America in technical and senior technical management roles with Dominion Mining, Ross Mining, Auzex Resources and Oceana Gold Corporation.
GM Business Development and Investor Relations since July 2023. 25 years’ mining and global financial markets experience across geology, equities research, investor relations and business development.
15
Atlantic management team Atlantic has a strong management team, with key personnel having years of experience in the region
Craig Hudson P. Eng Executive Vice President, Atlantic Appointed EVP Atlantic in May 2026. Formerly GM Atlantic Projects from 2024. Initial appointment with Atlantic Gold in 2017 to lead construction and commissioning of Touquoy. Over 15 years experience in gold mining sector, both internationally and in Canada. Experience with Barrick, Newmont and Ausenco specialising on project studies, consulting, commissioning and operations.
Andrew Taylor P. Eng Andrew Taylor P. Eng VP Operations
Dustin O'Leary
Vice President Operations
Manager Business Development
Appointed VP Atlantic Operations in late 2023. Formerly GM Operations from 2021 after stint as Manager Processing at Touquoy. Over 20 years of experience in the Canadian Mining Sector including with Inco/Vale in a variety of engineering, metallurgical and supervisory roles.
Appointed Manager Business Development in 2025. Formerly Manager Communications and leading government engagement. Over 20 years of experience government engagement, marketing and communications. Previously worked for the Halifax Regional Municipality as Promotions and Research Coordinator for 8 years. Awarded Queens Platinum Jubilee Medal for service to the Province of Nova Scotia.
Jennifer Adshade
Melissa Nicholson
Manager Community and First Nations
Environment Manager
Appointed Community & Indigenous Engagement Manager. Formerly with Atlantic in other senior permitting / engagement since roles 2018. Has worked as an Environmental Professional for over 15 years in Canada.
Appointed Environment Manager in 2022. With Atlantic since 2018. 13 years of environmental Contaminated Sites Assessment and Remediation experience as a 3rd party consultant. 7 years of experience in the Canadian gold mining sector
Adam Guignard Manager - Processing Appointed Manager Processing in 2021 and presently overseeing Touquoy since closure. Initial appointment with Atlantic Gold in 2017 to lead commissioning of Touquoy. 17 years of experience in the Canadian gold mining sector. Worked at seven different gold mines; commissioned five gold processing plants, including two as the lead and one as the signing authority.
Project status
Touquoy Restart
Following the sale, St Barbara will be a Nova Scotia focused developer, with near term production at Touquoy Restart supporting development activities at the 15-Mile Processing Hub
Touquoy Restart PFS completed Operating cash flow at US$4,000/oz anticipated at C$118m with 38koz gold production over a 13-month operation
Touquoy Restart permits approved Nova Scotia Environment and Climate Change approved amendments to Industrial Approval permit conditions
15-Mile
15-Mile Processing Hub Project PFS completed Long-term average gold production >100kozpa across an 11+ year mine life
Exploration pipeline bolstered Pipeline strengthened via regional EL acquisitions and prioritisation of key exploration targets
16
Upcoming Milestones
Touquoy Restart
Following the sale, St Barbara will be a Nova Scotia focused developer, with near term production at Touquoy Restart supporting development activities at the 15-Mile Processing Hub
Q4 CY26
Touquoy Restart production
Restart of ore processing at the Touquoy plant by end of calendar year 2026 — first ore, first cash flow from restart, and validation of the low-capital project
IAAC determination
15-Mile
15-Mile is expected to receive the Section 16 determination under the Impact Assessment Act, removing the requirement for a parallel federal impact assessment
15-Mile Processing Hub Project updated PFS
Updated PFS expected to be complete late September, incorporating the updated Mineral Resource Estimate Ore Reserve update to follow the updated PFS
FY27
15-Mile Processing Hub Project FS and FID Feasibility Study completion targeted for June 2027, concurrent with FID Submission of Environmental and Social Impact Assessment trigger documents over FY26/27 in parallel with Feasibility Study
17
18
Nova Scotia Projects Timeline 15-Mile Processing Hub FID targeted by end of FY27, with production targeted to commence in FY30 Touquoy Restart
FY 2027 Dec
FY 2028 Jun
Dec
FY 2029 Jun
Dec
FY 2030 Jun
Permitting, re-commissioning mill and construction of in-pit tailings Touquoy production 15-Mile Processing Hub Environmental Impact Assessment 1 Pre-Feasibility Study (Update) Feasibility Study Final Investment Decision Industrial Approval & Other permits Detailed Engineering Site construction Works Commissioning/Operations The above dates are indicative only and the Company reserves the right to vary the timeline at any time without notice, subject to the ASX Listing Rules and the Corporations Act and other applicable laws.
Dec
Jun
19
Attractive Royalty Portfolio St Barbara retains long-dated, capex-free exposure to gold via two NSR royalties (subject to completion occurring) on future production volumes from New Simberi Project and Tabar Islands Exploration Licences
New Simberi Gold Project
Tabar Islands Exploration
2.75% NSR royalty ► On 100% of gold and silver produced from the New Simberi Gold Project ► 13-year mine life supported by forecast total production of 2.0Moz payable gold
ASX: SBM · INVESTOR PRESENTATION · AUGUST 2026
━━━━━━
Investor presentation September 2026
Disclaimer This presentation has been prepared by St Barbara Limited (“Company”). The material contained in this presentation is summary information for general information purposes only. This presentation is not investment advice, nor is it an offer or invitation for subscription or purchase of, or a recommendation in relation to, securities in the Company and neither this presentation nor anything contained in it shall form the basis of any contract or commitment. This presentation contains forward-looking statements that are subject to risk factors associated with exploring for, developing, mining, processing, the sale of gold, trading markets and completion of acquisitions. Forward-looking statements include those containing such words as anticipate, estimates, forecasts, should, will, expects, plans, production guidance or similar expressions. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the Company, and which could cause actual results or trends to differ materially from those expressed in this presentation. Actual results may vary from the information in this presentation. The Company does not make, and this presentation should not be relied upon, any representation or warranty as to the accuracy, or reasonableness, of such statements or assumptions. Investors are cautioned not to place undue reliance on such statements. The statements, opinions, and estimates in this presentation are subject to change without notice and may be subject to rounding, as are statements about market and industry data, projections and guidance estimates. The Company undertakes no obligation to update publicly or release any revisions to these forward-looking statements. This presentation has been prepared by the Company as a summary based on information available to it, including information from third parties, and has not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. To the maximum extent permitted by law, neither the Company, their directors, employees or agents, advisers, nor any other person accepts any liability, including, without limitation, any liability arising from fault or negligence on the part of any of them or any other person, for any loss arising from the use of this presentation or its contents or otherwise arising in connection with it. Non-IFRS Measures: The Company's results are reported under the International Financial Reporting Standards (“IFRS”). This presentation includes certain non-IFRS financial measures, including cash operating costs, to provide a greater understanding of the Company operations. These measures:
- may be calculated differently by other companies and should not be used for comparison; and
- should be used in addition to, and not as a replacement for measures prepared in accordance with IFRS.
Financial figures are in Australian dollars unless otherwise noted. Financial year is 1 July to 30 June. This presentation is not audited.
Australian Securities Exchange (ASX) Listing code “SBM”
2
Disclaimer JORC Code
It is a requirement of the ASX Listing Rules that the reporting of exploration results and mineral resources in Australia comply with the 2012 edition of the Joint Ore Reserves Committee’s Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Investors outside Australia should note that while mineral resource estimates of St Barbara in this Presentation reported in accordance with the JORC Code (such JORC Code mineral resources being Mineral Resources), they may not comply with the relevant guidelines in other countries and, in particular, do not comply with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the Canadian NI 43-101 Standards); or (ii) Item 1300 of Regulation SK, which governs disclosures of mineral reserves in registration statements filed with the SEC. Information contained in this Presentation describing mineral deposits may not be comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian or US securities laws. You should not assume that quantities reported as “resources” will be converted to reserves under the JORC Code or any other reporting regime or that St Barbara will be able to legally and economically extract them. JORC Compliance statement The information in this presentation that relates to New Simberi’s Mineral Resources and Ore Reserves is extracted from the report titled ‘Q3 March FY26 Quarterly Report’ released to the ASX on 29 April 2026. Atlantic’s Mineral Resources is extracted from the report titled ‘15-Mile Processing Hub Mineral Resources Estimate Increases 24% to 2.5 Moz’ released to the ASX on 28 July 2026 and Ore Reserves is extracted from the report titled ‘Mineral Resources and Ore Reserves Statement as at 31 December 2025’ released to the ASX on 20 February 2026. These reports are available to view at www.stbarbara.com.au and www.asx.com.au, and for which Competent Persons’ consents were obtained. St Barbara confirms that it is not aware of any new information or data that materially affects the information included in the Original Reports and that all material assumptions and technical parameters underpinning the Mineral Resources and Ore Reserves estimates in the Original Reports continue to apply and have not materially changed. St Barbara confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the Original Reports and that each Competent Person’s consent remains in place for subsequent releases by St Barbara of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompany consent. Exploration Results The information in this presentation that relates to Exploration Results is based on information compiled by Dr Roger Mustard, who is a Member of The Australasian Institute of Mining and Metallurgy. Dr Mustard is a full-time employee of St Barbara and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Mustard consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The information in this presentation relates to the ASX release on 5 August 2026 titled “Accelerating Nova Scotia Gold Exploration Activity” and the Company confirms it is not aware of any new information or data that materially affects the information in that release and all material assumptions and technical parameters underpinning any estimates continue to apply without material change. No new material sensitive information This presentation does not contain new material sensitive information.
3
01
Corporate Overview
5
Corporate Summary Capital Structure Shares on issue (ASX: SBM)
Shareholders3 1,226.1M
Performance rights
69.5M
Share price1
A$0.80
Market capitalisation1
A$981M
Cash2
A$475M
Debt
Nil
Hedging
Nil
Equity investment in Geopacific Resources (ASX:GPR) – 14.3%1
Institutional (60%) Retail (34%) Other (6%)
Broker Coverage
Substantial Shareholders
- Paradice
- Baker Steel
- Vanguard
A$16M
Note: 1. Based on ASX closing prices as at 28 August 2026; 2. Cash position as at 30 June 2026, includes restricted cash of A$81 million for the Atlantic rehabilitation bond at AUD/CAD of 0.98; 3. As at 15 August 2026.
6
Capital Return to Shareholders1 Strengthened balance sheet supports a fully franked dividend and consideration of an on-market share buyback
Fully Franked Dividend
Considering a Share Buy-back
• Dividend declared: fully franked A$0.05 per share for FY26
• Size: on-market buy-back of up to 100 million shares under consideration
• Yield: equivalent to a dividend yield of ~6.3%, delivered fully franked to maximise after-tax shareholder returns • Franking credits: Board intends to pass on substantial franking credits to shareholders as quickly as the balance sheet and funding outlook permit • Funding capacity: supported by the strengthened balance sheet post-Lingbao, while retaining capacity to fund development projects • Headroom: ~A$71m franking balance could fund further franked dividends once balance sheet and development commitments permit
- Refer to ASX announcement on 28 August 2026 titled “FY26 Financial Results”
• Rationale: returns surplus capital to shareholders, consistent with the strengthened balance sheet and stated capital discipline • No approval needed: falls within the ‘10% / 12-month limit’ under the Corporations Act, so no shareholder approval is required • Timeline: expected to commence after the 15-Mile Processing Hub Pre-Feasibility Study update, anticipated end of September 2026 (final decision pending) • Execution: subject to market conditions, prevailing share price and capital requirements; may be varied, suspended or terminated
02
New Simberi Gold Project, Papua New Guinea
8
New Simberi Gold Project update Brownfield expansion to deliver significant near-term production uplift over a 14-year mine life Project status •
•
•
New Simberi Gold Project is transitioning from processing remnant oxides to a high annual production / low-cost sulphide ore processing operation ‒
Continuation of oxide remnant mining avoids disruptive closure and associated social impacts and costs of recommencement
‒
Expansion de-risked with continued business and logistic operations underway
Feasibility Study, December 20251, confirmed New Simberi Gold Project as a long-life, lowcost asset Construction is progressing, with main laydown and Run-of-Mine pad earthworks nearing completion, the new ball mill scheduled for site delivery in early October, and grinding circuit engineering and procurement each 50% complete
Recent milestones and upcoming catalysts
Mining Lease extension approved In January 2026 the Mining License for the New Simberi Gold Project was approved until 2038
New Simberi Gold Project Feasibility Study released1 Annual production >200kozpa from FY29 (100% basis) Post-tax NPV of US$1,023m at US$3,000/oz gold price and US$30/oz silver price
Mineral Resources and Ore Reserves update Mineral Resources increased to 5.8Moz Au (100% basis)2
New Simberi Gold Project Final Investment Decision Approved by St Barbara and Lingbao on basis of agreed Initial Life of Mine Plan
Completion of transactions with Lingbao in April 2026 New Simberi Gold Project fully-funded and de-risked Construction underway Construction commenced upon FID in H2 FY26 with plant commissioning in H2 FY28
Note 1: Refer to ASX announcement on 10 December 2025 titled “Feasibility Study confirms Simberi as a HighQuality Asset”
Note 2: Refer ASX Announcements on 20 February 2026 titled “Mineral Resources and Ore Reserves Statement as at 31 December 2025” and on 29 April 2026 titled “Quarterly Report Q3 FY26”
9
New Simberi Gold Project management team and key personnel Simberi Operations Group has a strong management team with extensive international experience
Huan Cai
Paul Botman
Randy McMahon
Shane Kay
Andrew Lawry
Managing Director & CEO
Executive General Manager Operations
Country Manager, PNG
CFO
Project Director – Simberi Expansion
Lingbao appointee to position of Managing Director & CEO of jointly owned Simberi companies in April 2026.
Appointed GM Processing in January 2026 and appointed EGM Simberi in June 2026.
Joined St Barbara in 2022. Appointed EGM Simberi Operations in July 2023 and appointed Country Manager in June 2026.
20 years’ international experience in operational, management and executive leadership roles across mining engineering, technical services and business development. Previous roles at Lingbao Gold, Golden Star Resources, China Gold and Rio Tinto.
20 years’ experience in mineral processing and metallurgy in Australia and Internationally, with expertise in operations, technical studies and project delivery. Previously worked in senior leadership positions at Ravenswood Gold, Stanmore Resources, BHP and Bluescope.
Over 30 years’ experience in a range of operational leadership roles covering mine engineering, new mine development and mine expansion, permitting and community engagement. International experience in Canada, Australia, Tanzania, India, Mongolia, and PNG (Porgera mine).
Commenced in June 2026 as CFO of jointly owned Simberi companies. 30 years’ global experience across different business phases including complex multi-party incorporated joint ventures with government participation. Previously worked in senior and executive roles for Sungela, Anglo American, Société des Mines de Fer de Guinée (SMFG), BHP, Rio Tinto.
Appointed Project Director Simberi Expansion in April 2025. Over 30 years’ experience in the delivery of technical, operational, and strategic leadership to mining, engineering and construction projects across Australia and internationally. Prior positions including GM Project Delivery for Heritage Minerals, GM Project, CEO and Group General Manager with Ravenswood Gold, MacPhersons Resources LionGold Corp & Polymetals.
New Simberi Gold Project Expands Existing Infrastructure
10
11
New Simberi Gold Project Highlights and Key Metrics Growth Capital (US$m) (40% basis) 2
New Simberi Gold Project production vs AISC (100% basis)1, 2
90 2,800
300 256 239
200
200
2,400 225
215
202
2,000
195
1,600 150
141 119
128
1,200
103
100
800
72
All-in Sustaining Costs (US$/oz)
Gold Production (koz)
250
18
56
50
400
8
23
FY27
FY28
FY29
FY30
FY31
Oxide
FY32
FY33
Sulphide
FY34
FY35
FY36
FY37
FY38
FY39
FY40
3
All-in Sustaining Cost (US$/oz)
- Mid-point of gold production and All-in Sustaining Costs; 2. Refer to ASX announcement on 20 April 2026 titled “Updated Group Production and Cost Outlook“
FY27
FY28
FY29
FY30
FY31
FY32
FY33
12
New Simberi Gold Project Timeline FID announced H2 FY26 with first ore production expected H2 FY28
New Simberi Feasibility Study Update (complete) Mining Lease Renewal (complete) Final Investment Decision (complete) CEPA Conditions
FY 2026 Dec
FY 2027 Jun
Dec
FY 2028 Jun
Dec
Early Works Packages Plant Design and Construction Plant Commissioning First Sulphide Ore Production
The above dates are indicative only and the Company reserves the right to vary the timeline at any time without notice, subject to the ASX Listing Rules and the Corporations Act and other applicable laws.
Jun
03
Nova Scotia Projects, Canada
14
Overview of Nova Scotia Projects Integrated Operation with 15-Mile Processing Hub Project
Nova Scotia Projects comprise: Touquoy Restart:
1
• Produces gold from the processing of existing stockpiles through the existing Touquoy processing plant
15-Mile Mine:
2
3
• Four simple low strip ratio open pits (Egerton-Maclean, Plenty, Hudson & 149) providing baseline feed to the relocated Touquoy mill
Old Mitchell Mine: • Redesigned as a satellite deposit with ore mining and haulage ~72 km to 15Mile commencing in year 3
Old Austen Mine:
4
• Low capital, satellite deposit introduced in year 4 of the mine plan with ore mining and haulage ~64 km to 15-Mile
Investment Proposition – Recent and Upcoming Milestones Recent achievements Touquoy Restart PFS completed Operating cash flow anticipated at C$118m with 38koz gold production over a 13-month operation
15-Mile Hub PFS completed Long-term average gold production >100kozpa across an 11+ year mine life
Touquoy Restart permits approved Nova Scotia Environment and Climate Change approved amendments to Industrial Approval permit conditions
Upcoming catalysts IAAC determination 15-Mile is expected to receive the Section 16 determination under the Impact Assessment Act, removing the requirement for a parallel federal impact assessment
15-Mile updated PFS
Updated PFS expected to be complete late September, incorporating the updated Mineral Resource Estimate Ore Reserve update following the updated PFS Q4 CY26
Touquoy Restart production
Restart of ore processing at the Touquoy plant by end of calendar year 2026 — first ore, first cash flow from restart, and validation of the low-capital project FY27
Exploration pipeline bolstered Pipeline strengthened via regional EL acquisitions and prioritisation of key exploration targets
15-Mile DFS and FID Feasibility Study completion targeted for June 2027, concurrent with FID Submission of environmental and Social Impact assessment trigger documents over FY26/27 in parallel with Feasibility Study
15
16
Nova Scotia Projects – Touquoy Restart and 15-Mile Hub Nova Scotia Projects Production Nova Scotia Projects Production vs AISC1 vs AISC 1
113 105
106
107
2,000 112
201
107
102
100
98
102
96
1,600
Gold Production (koz)
87 80 1,200 60 800 39
40
20
19
All-in Sustaining Cost (US$/oz)
120
1 1 Growth Capital (US$m) Growth Capital (US$m)
90
50
400
19
6
FY27
FY28
FY29
Touquoy Stockpiles
FY30
FY31
15-Mile
FY32
FY33
FY34
FY35
Cochrane HillMine Old Mitchell
FY36
FY37
FY38
Beaver DamMine Old Austen
FY39
FY40
FY41
0
FY27
FY28
FY29
All-in Sustaining Cost (US$/oz)
Note: 1. Refer to ASX announcement on 20 April 2026 titled “Updated Group Production and Cost Outlook”; 15-Mile Processing Hub Pre-Feasibility Study uses US$3,000 gold price and CAD/USD of 0.71
FY30
FY31
FY32
FY33
17
Atlantic management team and key personnel Atlantic has a strong management team, with key personnel having years of experience in the region
Craig Hudson P. Eng Executive Vice President, Atlantic Appointed EVP Atlantic in May 2026. Formerly GM Atlantic Projects from 2024. Initial appointment with Atlantic Gold in 2017 to lead construction and commissioning of Touquoy. Over 15 years experience in gold mining sector, both internationally and in Canada. Experience with Barrick, Newmont and Ausenco specialising on project studies, consulting, commissioning and operations.
Andrew Taylor P. Eng Andrew Taylor P. Eng VP Operations
Dustin O'Leary
Vice President Operations
Manager Business Development
Appointed VP Atlantic Operations in late 2023. Formerly GM Operations from 2021 after stint as Manager Processing at Touquoy. Over 20 years of experience in the Canadian Mining Sector including with Inco/Vale in a variety of engineering, metallurgical and supervisory roles.
Appointed Manager Business Development in 2025. Formerly Manager Communications and leading government engagement. Over 20 years of experience government engagement, marketing and communications. Previously worked for the Halifax Regional Municipality as Promotions and Research Coordinator for 8 years. Awarded Queens Platinum Jubilee Medal for service to the Province of Nova Scotia.
Jennifer Adshade
Melissa Nicholson
Manager Community and First Nations
Environment Manager
Appointed Community & Indigenous Engagement Manager. Formerly with Atlantic in other senior permitting / engagement since roles 2018. Has worked as an Environmental Professional for over 15 years in Canada.
Appointed Environment Manager in 2022. With Atlantic since 2018. 13 years of environmental Contaminated Sites Assessment and Remediation experience as a 3rd party consultant. 7 years of experience in the Canadian gold mining sector
Adam Guignard Manager - Processing Appointed Manager Processing in 2021 and presently overseeing Touquoy since closure. Initial appointment with Atlantic Gold in 2017 to lead commissioning of Touquoy. 17 years of experience in the Canadian gold mining sector. Worked at seven different gold mines; commissioned five gold processing plants, including two as the lead and one as the signing authority.
18
Touquoy Restart Project Overview Project Details1 •
Nova Scotia Projects
1
Key Metrics
Touquoy Restart Study results1 outlined a near-term, low capital and low-cost restart ‒ Initial capital of C$11.4m ‒ Estimated gold production of 38koz over a 13-month period ‒ Average All-in Sustaining Cost of US$1,598/oz
Processing life
1.1 years
Total Mill Feed Tonnes
3.0 Mt
Average Mill Feed Gold Grade
0.4 g/t
Total Contained Gold
43 koz
•
Touquoy Restart opportunity provides near-term additional upside for Atlantic with minimal capital spend
•
On 13 April 2026, the NSECC approved amendments to the Industrial Approval permit conditions for the Touquoy Restart
•
On 24 April FID was approved and two major contracts signed
Total Recovered Gold
38 koz
•
Preparation for the in-pit tailings deposition system is underway and material movement activities have already commenced on the ore and waste stockpiles
Average Gold Recovery
88%
•
Touquoy Restart is anticipated to recommence ore processing by the end of calendar year 2026
Cash cost
US$1,430 – 1,630/oz
AISC
US$1,500 – 1,700/oz
Project Initial capex
US$7-9m
Project Highlights
38 koz
RECOVERED GOLD
88%
GOLD RECOVERY
US$1,598/oz Avg. AISC
- Refer to ASX announcement on 20 April 2026 titled “Updated Group Production and Cost Outlook“
15-Mile Processing Hub Project Overview
19
Nova Scotia Projects
2
Project Details1
Key Metrics
•
Total waste mined
114.5 Mt
Average Strip Ratio
3.4 w:o
Operational years
FY30 – FY41
Total Mill Feed
33.4 Mt
Average Mill Feed Grade
1.1 g/t
Processing Hub includes 3 stage crushing, ball mill, gravity, CIL, cyanide detox with conventional tailings
Average Gold Recovery
95.3%
‒ Reuses the majority of the Touquoy Process Plant
Total contained gold
1.2 Moz
Mining costs
C$19.5/t milled
Mining Feed Transport
C$5.8/t milled
Processing costs
C$10.7/t milled
G&A costs
C$4.5/t milled
Initial capex
C$283m
Sustaining capex LOM
C$230m
• •
15-Mile Processing Hub Project Pre-Feasibility Study completed in December 2025 confirmed project with production over 100kozpa across an 11+ year mine life ‒ 15-Mile Mine contains 4 open pits with Ore Reserves of 620koz ‒ Old Mitchell Mine contains 1 open pit with Ore Reserves of 390koz ‒ Old Austen Mine contains 1 open pit with Ore Reserves of 220koz Gold is free-milling with high recovery from conventional gravity & Carbon-in-Leach (CIL) methods at relatively coarse grind size
•
Project phases include 1) 1 year construction, 2) 11+ years operation
•
An updated Mineral Resources Estimate was completed to support the next phases of the Project, expanded by to 24% 2.5Moz Au
•
Ore Reserve update following the updated PFS on the recent new Mineral Resource
Project Highlights
100 koz
AVG. PRODUCTION
11+ years MINE LIFE
2.5 Moz
TOTAL CONTAINED AU
3
4
- Refer to ASX announcement on 21 January 2026 titled “15-Mile Processing Hub Pre-Feasibility Completed”. Ore Reserves figures extracted from the report released to the ASX on 20 February 2026 titled ”31 December 2025 Mineral Resources and Ore Reserves Statement”.
20
Nova Scotia Projects Timeline 15-Mile Processing Hub FID targeted by end of FY27, with production expected to commence in FY30 15-Mile Processing Hub
FY 2026 Dec
Jun
FY 2027 Dec
Jun
FY 2028 Dec
Jun
FY 2029 Dec
Jun
Environmental Impact Assessment Pre-Feasibility Study (Update) Feasibility Study Final Investment Decision Industrial Approval & Other permits Detailed Engineering Site construction Works Commissioning/ Operations Touquoy Restart Permitting, re-commissioning mill and construction of in-pit tailings Touquoy production The above dates are indicative only and the Company reserves the right to vary the timeline at any time without notice, subject to the ASX Listing Rules and the Corporations Act and other applicable laws.
Note: 1. Assumes consolidated Environmental Impact Assessment for 15-Mile Mine, Old Austen Mine and Old Mitchell Mine
FY 2030 Dec
Jun
Nova Scotia Projects – 15-Mile Processing Hub Exploration Pipeline Exploration targets1
21
• Tenement holdings within 75 km of the proposed 15-Mile Processing Hub Project and proximity to the Touquoy mine, 15-Mile, Old Austen Mine and Old Mitchell Mine deposits • 58 active exploration targets comprising:
- 1 x Stage E target (Mining Operation),
- 3 x Stage D targets (Feasibility),
- 1 x Stage C target (Resource drilling),
- 4 x Stage B2 targets (containing multiple economic drill intersections),
- 26 x Stage B1 targets (ready for drill testing with no more than one economic drill intersection), and
- 23 x Stage A targets (conceptual) • FY27 work programs are highlighted for: o surface sampling (in orange), o geophysical surveys or re-processing / 3D modelling (in purple), and o RC drilling (in red)
- Refer to ASX announcement 5 August 2026 titled “Accelerating Nova Scotia Gold Exploration Activity”
Nova Scotia Projects – 15-Mile Processing Hub Exploration Pipeline Exploration targets1
• 46 exploration targets within 75 km of the proposed 15-Mile Processing Hub Project ranging from: ‒ Stage A (conceptual target) ‒ Stage B2 (Advance drill target with multiple economic intercepts) ‒ Stage D (project at Feasibility Study level) and ‒ Stage E (Mining Operation)
- Refer to ASX announcement 5 August 2026 titled “Accelerating Nova Scotia Gold Exploration Activity”
22
Nova Scotia Projects – 15-Mile Processing Hub Exploration Pipeline Exploration targets1
23
• Regional exploration tenement position across Nova Scotia • FY27 work programs are highlighted for: o surface sampling (in orange), o geophysical surveys or reprocessing / 3D modelling (in purple), and o RC drilling (in red) • The dashed white line shows the limits of the recently completed regional geophysical compilation and reprocessing and image generation
- Refer to ASX announcement 5 August 2026 titled “Accelerating Nova Scotia Gold Exploration Activity”
Nova Scotia Projects – 15-Mile Processing Hub Exploration Pipeline Exploration targets1
• 12 exploration targets that lie outside of the 75 km radius of 15-Mile Processing Hub Project: ‒ Stage A (conceptual target) ‒ Stage B2 (Advance drill target with multiple economic intercepts) ‒ Stage D (project at Feasibility Study level) and ‒ Stage E (Mining Operation)
- Refer to ASX announcement 5 August 2026 titled “Accelerating Nova Scotia Gold Exploration Activity”
24
A Appendix
26
St Barbara management team
Andrew Strelein
Sara Prendergast
Phil Stephenson
Brett Ascott
Kylie Panckhurst
Roger Mustard
David Cotterell
Managing Director & CEO
Chief Financial Officer
Operations Advisor
EGM Projects & Technical Support EGM Projects and Technical Support since July 2023.
General Counsel & Company Secretary General Counsel and Company Secretary since September 2023.
EGM Exploration
GM Business Development & Investor Relations GM Business Development and Investor Relations since July 2023.
Managing Director & CEO since July 2023.
Chief Financial Officer since September 2023.
Operations Advisor since February 2025.
Highly experienced mining executive with extensive global experience in leadership roles across a number of mining jurisdictions including Australia, Indonesia, Africa and North America with Newmont, Euronimba and earlier with Normandy.
Over 20 years’ finance experience in multinational listed mining companies across a range of commodities including Nickel, Gold, Copper, Uranium and Zinc with Gold Fields, Minara Resources, Xstrata, BHP Billiton, Glencore, Downer, and Orica.
Extensive global mining experience, including PNG (Lihir and Porgera), Australia, Indonesia and North America, in senior management and executive leadership roles with Newcrest, Newmont, Barrick and Placer Dome.
Extensive experience in incorporated and unincorporated joint ventures including KCGM, Boddington, Euronimba, gold refineries and power stations.
Experience with joint ventures including KCGM.
Over 30 years of industry experience across Australia, Indonesia and West Africa in senior technical management roles covering geology, geotechnical engineering, mining engineering, business and strategic planning, project management, studies and business development.
Over 15 years’ experience as a corporate and commercial lawyer across various industries. Executed transactions and supported projects in Africa, the Americas, Asia-Pacific and Europe for both public and private sector clients.
EGM Exploration since July 2023. Over 30 years of gold exploration experience across Asia-Pacific and North America in technical and senior technical management roles with Dominion Mining, Ross Mining, Auzex Resources and Oceana Gold Corporation.
25 years’ mining and global financial markets experience across geology, equities research, investor relations and business development.
27
Gold Company References: Resources and Reserves Company
ASX Code
Market Cap
Net Debt
EV
Mineral Resources (Au-Eq)
Ore Reserves (Au-Eq)
A$m
A$m
A$m
Moz
g/t
Moz
g/t
Source
Date
EV/ EV/ Resource Reserve A$/oz
A$/oz
Ora Banda
OBM
3,075
(268)
2,807
3.7
2.0
0.6
2.3
Annual Report 2026
26 Aug 2026
761
4,602
Emerald
EMR
4,711
(468)
4,243
3.9
1.2
0.7
1.5
Annual Report 2026
30 Jun 2026
1,080
6,528
Black Cat
BC8
824
(105)
718
3.0
2.9
0.3
2.4
Quarterly Activities Report
30 Jul 2026
232
2,177
Pantoro
PNR
1,122
(223)
899
4.6
3.3
0.9
2.1
Annual Mineral Resource and Ore Reserve Statement
22 Sep 2025
195
1,047
Bellevue
BGL
2,476
(95)
2,380
3.1
9.0
1.3
4.7
FY26 Guidance and Annual Resource & Reserve Statement
1 Aug 2025
768
1,845
Catalyst
CYL
1,803
(323)
1,480
4.5
3.3
1.5
2.6
ASX Announcement
6 Jul 2026
335
960
Rox
RXL
829
(153)
677
2.2
5.6
0.7
4.4
Quarterly Activities Report
22 Jul 2026
312
1,004
Kingsgate
KCN
1,413
(234)
1,178
5.8
0.7
3.0
0.7
Mineral Resources and Ore Reserves Statement 2025
10 Oct 2025
196
376
Santana
SMI
527
(183)
344
2.3
2.1
1.2
2.5
Quarterly Activities Report
29 Jul 2026
147
277
West African
WAF
4,484
(670)
3,813
13.7
0.9
6.9
1.0
ASX Announcement
31 Mar 2026
400
781
Turaco
TCG
846
(51)
795
4.7
1.3
Quarterly Activities Report
30 Jul 2026
212
St Barbara1
SBM
981
(509)
472
5.4
1.3
2.6
1.0
29 Apr, 28 Jul, 2026
86
183
Source. Company disclosures. 1. St Barbara gold equivalent calculations based on A$3,100/oz for gold, A$35/oz for silver.
Quarterly Report Q3 FY26 ASX Announcement
28
Appendix 3A.1 - Notification of dividend / distribution
Announcement Summary
Entity name ST BARBARA LIMITED Security on which the Distribution will be paid SBM - ORDINARY FULLY PAID Announcement Type New announcement Date of this announcement 28/8/2026 Distribution Amount AUD 0.05000000 Ex Date 23/9/2026 Record Date 24/9/2026 Payment Date 16/10/2026 Refer to below for full details of the announcement
Appendix 3A.1 - Notification of dividend / distribution
1/4
Appendix 3A.1 - Notification of dividend / distribution
Announcement Details
Part 1 - Entity and announcement details
1.1 Name of +Entity ST BARBARA LIMITED 1.2 Registered Number Type
Registration Number
ABN
36009165066
1.3 ASX issuer code SBM 1.4 The announcement is New announcement 1.5 Date of this announcement 28/8/2026 1.6 ASX +Security Code SBM ASX +Security Description ORDINARY FULLY PAID
Part 2A - All dividends/distributions basic details
2A.1 Type of dividend/distribution Ordinary 2A.2 The Dividend/distribution: relates to a period of six months 2A.3 The dividend/distribution relates to the financial reporting or payment period ending ended/ending (date) 30/6/2026 2A.4 +Record Date 24/9/2026 2A.5 Ex Date 23/9/2026 2A.6 Payment Date 16/10/2026 2A.7 Are any of the below approvals required for the dividend/distribution before business day 0 of the timetable? Security holder approval Court approval Lodgement of court order with +ASIC ACCC approval FIRB approval Appendix 3A.1 - Notification of dividend / distribution
2/4
Appendix 3A.1 - Notification of dividend / distribution FIRB approval Another approval/condition external to the entity required before business day 0 of the timetable for the dividend/distribution. No 2A.8 Currency in which the dividend/distribution is made ("primary currency") AUD - Australian Dollar 2A.9 Total dividend/distribution payment amount per +security (in primary currency) for all dividends/distributions notified in this form AUD 0.05000000
2A.10 Does the entity have arrangements relating to the currency in which the dividend/distribution is paid to securityholders that it wishes to disclose to the market? No 2A.11 Does the entity have a securities plan for dividends/distributions on this +security? We have a Dividend/Distribution Reinvestment Plan (DRP) 2A.11a If the +entity has a DRP, is the DRP applicable to this dividend/distribution? No
2A.12 Does the +entity have tax component information apart from franking? No
Part 3A - Ordinary dividend/distribution
3A.1 Is the ordinary dividend/distribution estimated at this time? No
3A.1a Ordinary dividend/distribution estimated amount per +security AUD
3A.1b Ordinary Dividend/distribution amount per security AUD 0.05000000 3A.2 Is the ordinary dividend/distribution franked? Yes
3A.2a Is the ordinary dividend/distribution fully franked? Yes
3A.3 Percentage of ordinary dividend/distribution that is 3A.3a Applicable corporate tax rate for franking credit franked (%) 100.0000 %
30.0000 %
3A.4 Ordinary dividend/distribution franked amount per +security
3A.5 Percentage amount of dividend which is unfranked 0.0000 %
AUD 0.05000000
Appendix 3A.1 - Notification of dividend / distribution
3/4
Appendix 3A.1 - Notification of dividend / distribution 3A.6 Ordinary dividend/distribution unfranked amount per +security excluding conduit foreign income amount AUD 0.00000000 3A.7 Ordinary dividend/distribution conduit foreign income amount per security AUD 0.00000000
Part 5 - Further information
5.1 Please provide any further information applicable to this dividend/distribution
5.2 Additional information for inclusion in the Announcement Summary
Appendix 3A.1 - Notification of dividend / distribution
4/4
Statutory Profit After Tax of A$490 million Fully Franked A$0.05 per Share Dividend Declared
Highlights • •
•
Net assets up 148% to A$928 million at end of FY26 (from A$374 million in FY25) o Cash of A$475 million o No debt and no hedging Statutory profit after tax of A$490 million o A$500 million gain on deconsolidation of New Simberi Gold following the Lingbao transaction o New Simberi Gold underlying profit for the first nine months of FY26 A$40 million (up from underlying loss of A$30.0 million in FY25 for 12 months)1 Fully franked dividend of A$0.05 per share declared
St Barbara Limited (“St Barbara” or the “Company”) (ASX: SBM) is pleased to announce the financial performance for the year ending 30 June 2026. Further details of the results are set out in the Appendix 4E and the Directors and Financial Report. St Barbara Limited Managing Director and CEO Andrew Strelein said: “FY26 was a breakthrough year for St Barbara. We completed the Lingbao strategic investment, secured the funding and early mining lease renewal for FID on the New Simberi Gold Expansion Project, completed permitting and FID for the Touquoy Restart and we delivered a compelling 15-Mile Processing Hub Project Pre-Feasibility Study.” “The strengthened balance sheet and healthy funding position has enabled the Board to declare a fully franked dividend of A$0.05 per share. The Company is also considering an on-market share buy-back of up to 100 million shares but will delay a decision until we have been able to announce the results of the update to the 15-Mile Processing Hub Project Pre-Feasibility Study, which is anticipated to be released at the end of September.” “The Company is committed to prudent capital discipline and will take the opportunity to pass on the available franked dividends as quickly as the balance sheet and funding outlook permits. St Barbara enters FY27 focused on value creation for shareholders, through project delivery, operational performance and efficient capital management.”
FY26 Financial Performance FY25 (Restated)2
FY26
(94)
490
A$ million
1
(18)
A$ million
(19)
(33)
Underlying profit/(loss) after tax6
A$ million
(18)
(29)
Total cash
A$ million
157
475
Statutory profit/(loss) after tax3
A$ million
EBITDA (excluding significant items)4 EBIT (excluding significant items)5
Footnotes are presented on Page 3.
St Barbara Limited ABN 36 009 165 066 Level 19, 58 Mounts Bay Road, Perth WA 6000 PO Box 1161, West Perth WA 6872 T +61 8 9476 5555 stbarbara.com.au
ASX: SBM
FY26 New Simberi Operating Performance* All-In Sustaining Cost
FY25
FY26
A$/oz
4,582
4,829
Attributable gold production
koz
51
41
Attributable gold sales
koz
48
41
Realised gold price
A$/oz
4,428
6,232
*FY26 operating performance at New Simberi comprises 100% ownership for the first nine months of FY26 and 50% ownership for last three months of FY26.
Fully Franked Dividend The Board has declared a fully franked ordinary dividend of A$0.05 per share. The dividend follows the strengthening of the Company’s balance sheet following the completion of the Lingbao transaction while the capacity to fund development projects remains strong. The Board has approved the transfer of A$355 million of the FY26 Statutory Profit After Tax to a Distributable Reserve account as at 30 June 2026. St Barbara’s current franking account credit balance of A$97 million will drop to A$71 million after the payment of the dividend of A$0.05 per share. The key dates for participation in the dividend are as follows: •
Ex-date for dividend entitlement 23 September 2026
•
Record date 24 September 2026
•
Payment date 16 October 2026
Considering a Share Buy-back As part of the Company’s capital management, the Company is considering undertaking a share buy-back program to acquire up to 100 million shares but will delay a decision until after the announcement of the updated Pre-Feasibility Study for the 15-Mile Processing Hub Project is released. That announcement is presently anticipated at the end of September 2026. The total of up to 100 million shares being considered for the on-market share buy-back would fall within the ‘10% over a 12 month period limit’ permitted under the Corporations Act 2001 (Cth) and accordingly would not require shareholder approval. The Company would immediately cancel any shares acquired by it under such a buy-back. Any decision to proceed with a buy-back and the timing and number of shares proposed to be purchased would depend on market conditions, the prevailing St Barbara share price, future capital requirements and other relevant considerations at that time. The Company reserves the right to vary, suspend or terminate any buy-back at any time. There is no guarantee that a decision will be made to proceed with any buy-back.
Authorised by Board of Directors
Appendix 2A - Application for quotation of securities
Announcement Summary
Entity name ST BARBARA LIMITED Announcement Type New announcement Date of this announcement Friday August 28, 2026 The +securities to be quoted are: +Securities issued under an +employee incentive scheme that are not subject to a restriction on transfer or that are to be quoted notwithstanding there is a restriction on transfer Total number of +securities to be quoted ASX +security code
Security description
SBM
ORDINARY FULLY PAID
Number of +securities to be quoted
Issue date
16,261,570
28/08/2026
Refer to next page for full details of the announcement
Appendix 2A - Application for quotation of securities
1/7
Appendix 2A - Application for quotation of securities
Part 1 - Entity and announcement details
1.1 Name of entity ST BARBARA LIMITED We (the entity named above) apply for +quotation of the following +securities and agree to the matters set out in Appendix 2A of the ASX Listing Rules. 1.2 Registered number type
Registration number
ACN
009165066
1.3 ASX issuer code SBM 1.4 The announcement is New announcement 1.5 Date of this announcement 28/8/2026
Appendix 2A - Application for quotation of securities
2/7
Appendix 2A - Application for quotation of securities
Part 2 - Type of Issue
2.1 The +securities to be quoted are: +Securities issued under an +employee incentive scheme that are not subject to a restriction on transfer or that are to be quoted notwithstanding there is a restriction on transfer 2.2 The +class of +securities to be quoted is: Additional +securities in a class that is already quoted on ASX ("existing class")
Appendix 2A - Application for quotation of securities
3/7
Appendix 2A - Application for quotation of securities
Part 3B - number and type of +securities to be quoted (existing class) where issue has not previously been notified to ASX in an Appendix 3B
Additional +securities to be quoted in an existing class issued under an +employee incentive scheme FROM (Existing Class) ASX +security code and description SBMAK : PERFORMANCE RIGHTS
TO (Existing Class) ASX +security code and description SBM : ORDINARY FULLY PAID
Please state the number of +securities issued under the +employee incentive scheme that are not subject to a restriction on transfer or that are to be quoted notwithstanding there is a restriction on transfer 16,261,570 Please provide details of a URL link for a document lodged with ASX detailing the terms of the +employee incentive scheme or a summary of the terms A summary of the performance rights was provided in a schedule to the Notice of 2023 Annual General Meeting, released on 15 September 2023 (https://stbarbara.com.au/wp-content/uploads/2023/09/2023.09.15-2023-notice-of-annual-generalmeeting.pdf), which vested as described in the 2026 Directors and Financial Report released today. Are any of these +securities being issued to +key management personnel (KMP) or an +associate Yes Provide details of the KMP or +associates being issued +securities Name of KMP
Name of registered holder
Number of +securities
Sara Prendergast
Sara Prendergast
1,620,746
Andrew Strelein
Andrew Strelein
3,160,454
Issue date 28/8/2026 Will the +securities to be quoted rank equally in all respects from their issue date with the existing issued +securities in that class? Yes
Appendix 2A - Application for quotation of securities
4/7
Appendix 2A - Application for quotation of securities Issue details
Number of +securities to be quoted 16,261,570 Are the +securities being issued for a cash consideration? No Please describe the consideration being provided for the +securities Nil consideration under the Company's employee share rights plan. Please provide an estimate (in AUD) of the value of the consideration being provided per +security for the +securities to be quoted 0.674500 Any other information the entity wishes to provide about the +securities to be quoted $0.6745 (5 day VWAP to 26 August 2026).
Appendix 2A - Application for quotation of securities
5/7
Appendix 2A - Application for quotation of securities
Part 4 - Issued capital following quotation
Following the quotation of the +securities the subject of this application, the issued capital of the entity will comprise: The figures in parts 4.1 and 4.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing. 4.1 Quoted +securities (total number of each +class of +securities quoted on ASX following the +quotation of the +securities subject of this application) ASX +security code and description
Total number of +securities on issue
SBM : ORDINARY FULLY PAID
1,226,057,431
4.2 Unquoted +securities (total number of each +class of +securities issued but not quoted on ASX) ASX +security code and description SBMAK : PERFORMANCE RIGHTS
Appendix 2A - Application for quotation of securities
Total number of +securities on issue 71,647,797
6/7
Appendix 2A - Application for quotation of securities
Part 5 - Other Listing Rule requirements
5.1 Are the +securities being issued under an exception in Listing Rule 7.2 and therefore the issue does not need any security holder approval under Listing Rule 7.1? Yes 5.1a Select the number of the applicable exception in Listing Rule 7.2 9
Appendix 2A - Application for quotation of securities
7/7
Prompts
Click prompts to add them under the company line, click again to take one out, then copy the result into your AI chat. Shared by Asian Century Stocks and Uncovered Thai Stocks. Thank you.
ETFs Holding St Barbara Limited
Exchange-traded funds whose newest published daily portfolio holds one of the company's listings, largest weight first.
| ETF | Weight in ETF | Shares | Market value | As of |
|---|---|---|---|---|
| GDMN | 0.06% | 222,547 | $ 122.806K | Aug 31, 2026 |
| AVDV | 0.05% | 21,931,103 | $ 9.972M | Nov 16, 2026 |
| AVDS | 0.03% | 221,541 | $ 100.739K | Nov 16, 2026 |
| DFIS | 0.03% | 3,211,290 | $ 1.542M | Nov 12, 2026 |
| DISV | 0.02% | 1,677,926 | $ 805.58K | Nov 12, 2026 |
| AVDE | 0.01% | 2,708,352 | $ 1.232M | Nov 16, 2026 |
| DFIC | 0.00% | 1,487,367 | $ 714.092K | Nov 12, 2026 |
| DFAX | 0.00% | 960,309 | $ 461.049K | Nov 12, 2026 |
| DFAI | 0.00% | 1,116,610 | $ 536.09K | Nov 12, 2026 |
| DFSI | 0.00% | 58,045 | $ 27.868K | Nov 12, 2026 |
| DXIV | 0.00% | 3,389 | $ 1,627.08 | Nov 12, 2026 |