|
Peninsula Energy Limited is a uranium mining company that produces yellowcake (U3O8) through its wholly-owned subsidiary, Strata Energy, Inc. The company operates the Lance Project and the Dagger Project in Wyoming, USA, with the Lance Project serving as its flagship asset. The Lance Project comprises the Ross Production Area, Kendrick Mining Area, and Barber Exploration Area, utilizing low-pH In-Situ Recovery (ISR) technology for uranium extraction. Peninsula produces finished yellowcake for the global nuclear energy market, with production re-commenced in December 2024 and ongoing ramp-up activities coordinated with the commissioning of an expanded Central Processing Plant. The company focuses on delivering consistent flow rates from wellfields and optimizing chemical processes to support long-term production growth. Summarised from the company's own disclosures, fiscal year ended Jun 2026 |
Industry Energy | Homepage pel.net.au |
| Sector Energy | IR page pel.net.au/investor-centre | |
|
Tags
uranium mining, yellowcake production, in-situ recovery, low-ph isr, nuclear fuel supply, resource exploration, Lance Project, Dagger Project, Strata Energy Inc, Ross Production Area, Kendrick Mining Area, Barber Exploration Area, Central Processing Plant, Header House 14, MU-3, MU-4, MU-1
|
Press page — |
Metrics
| Valuation | |
|---|---|
| Market cap | A$ 105.74M |
| Market cap (USD) | $ 71.177M |
| P/E | -0.92 |
| PEG | — |
| P/BV | 0.37 |
| P/S | 108.83 |
| P/OCF | -1.83 |
| P/FCF | — |
| Dividend yield | — |
| Turnover / mcap | — |
| Returns | |
|---|---|
| ROE | -43.8% |
| ROI | -42.5% |
| ROIC | -42.5% |
| Profit margin | -11,786.2% |
| Growth | |
|---|---|
| Revenue growing | No |
| Profits growing | No |
| Revenue up 3y | — |
| Revenue up 5y | — |
| Earnings growth 3y (net profit CAGR) | — |
| Quality | |
|---|---|
| Profitable | No |
| Margin expanding | No |
| Buying back stock | — |
| Diluting (TTM) | — |
| Debt/Equity | — |
| Podcast bulls (TTM) | Sign up |
| Podcast bears (TTM) | Sign up |
| Podcast sentiment (TTM) | Sign up |
| Podcast sentiment % (TTM) | Sign up |
| News sentiment (TTM) | 0 |
| Quality score | -76.9% |
| Insiders | |
|---|---|
| Buys, 1w | Sign up |
| Buys, 1m | Sign up |
| Buys, 1y | Sign up |
| Sells, 1w | Sign up |
| Sells, 1m | Sign up |
| Sells, 1y | Sign up |
| Figure | FY 2026 | FY 2025 | FY 2024 | FY 2023 | FY 2022 | FY 2021 | FY 2020 | FY 2019 | FY 2018 | FY 2017 | FY 2016 | FY 2015 | FY 2014 | FY 2013 | FY 2012 | FY 2011 | FY 2010 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenue | 654K | 0 | 11.866M | 40.4M | 18.3M | 9.775M | 6.078M | 6.592M | 13.162M | 18.267M | 5.771M | 183.203K | 164.898K | 401.634K | 0 | 0 | 0 |
| Net profit | -77.082M | -12.495M | -12.412M | -3.542M | -4.635M | -1.432M | -7.639M | -42.521M | 503K | -74.725M | -3.529M | -4.206M | -5.845M | -15.128M | -7.535M | -7.254M | — |
Podcast Mentions
Announcements lodged with ASX, newest first, routine forms (director and substantial-holding notices, daily buy-back and quotation notices) included. The link opens the announcement on ASX. Press releases from the company's own website, newest first.
Rule 5.5 ASX Listing Rules Appendix 5B (17/07/20) Page 1
- See chapter 19 of the ASX Listing Rules for defined terms. Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report Name of entity Peninsula Energy Limited ABN Quarter ended (“current quarter”) 62 062 409 303 30 September 2026
Consolidated statement of cash flows Current quarter $US’000 Year to date (3 months) $US’000
- Cash flows from operating activities 654 654 1.1 Receipts from customers 1.2 Payments for
(a) exploration & evaluation (b) Other Lance Project costs - - (c) production (8,924) (8,924) (d) staff costs (790) (790) (e) administration and corporate costs (1,675) (1,675) 1.3 Dividends received (see note 3) - - 1.4 Interest received 137 137 1.5 Interest and other costs of finance paid (866) (866) 1.6 Income taxes paid - - 1.7 Government grants and tax incentives - - 1.8 Other (sales contract costs) - - 1.9 Net cash from / (used in) operating activities (11,464) (11,464)
- Cash flows from investing activities
2.1 Payments to acquire or for: (a) entities (b) tenements - - (c) property, plant and equipment - - (d) exploration & evaluation - - (e) other non-current assets - -
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
- See chapter 19 of the ASX Listing Rules for defined terms. Consolidated statement of cash flows Current quarter $US’000 Year to date (3 months) $US’000 2.2 Proceeds from the disposal of:
(a) entities (b) tenements - - (c) property, plant and equipment - - (d) investments - - (e) other non-current assets - - 2.3 Cash flows from loans to other entities - - 2.4 Dividends received (see note 3) - - 2.5 Lance Project development costs (6,528) (6,528) 2.6 Net cash from / (used in) investing activities (6,528) (6,528)
- Cash flows from financing activities 29 29 3.1 Proceeds from issues of equity securities (excluding convertible debt securities) 3.2 Proceeds from issue of convertible debt securities 30,000 30,000 3.3 Proceeds from exercise of options - - 3.4 Transaction costs related to issues of equity securities or convertible debt securities
3.5 Proceeds from borrowings - - 3.6 Proceeds and (Repayment) of borrowings (minor leases) (1) (1) 3.7 Transaction costs related to loans and borrowings (1,183) (1,183) 3.8 Dividends paid - - 3.9 Other (provide details if material) - - 3.10 Net cash from / (used in) financing activities 28,845 28,845
- Net increase / (decrease) in cash and cash equivalents for the period
4.1 Cash and cash equivalents at beginning of period 22,053 22,053 4.2 Net cash from / (used in) operating activities (item 1.9 above) (11,464) (11,464) 4.3 Net cash from / (used in) investing activities (item 2.6 above) (6,528) (6,528) 4.4 Net cash from / (used in) financing activities (item 3.10 above) 28,845 28,845
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
- See chapter 19 of the ASX Listing Rules for defined terms. Consolidated statement of cash flows Current quarter $US’000 Year to date (3 months) $US’000 4.5 Effect of movement in exchange rates on cash held 707 707 4.6 Cash and cash equivalents at end of period 33,613 33,613
- Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts
Current quarter $US’000 Previous quarter $US’000 5.1 Bank balances 5,268 20,597 5.2 Call deposits 28,345 1,456 5.3 Bank overdrafts - - 5.4 Other (provide details) - - 5.5 Cash and cash equivalents at end of quarter (should equal item 4.6 above) 33,613 22,053
- Payments to related parties of the entity and their associates Current quarter $US'000 6.1 Aggregate amount of payments to related parties and their associates included in item 1 335 6.2 Aggregate amount of payments to related parties and their associates included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for, such payments.
Amounts shown at item 6.1 comprise of payments made to Executive Directors (including
superannuation) and payment of Non-Executive Director fees during the quarter.
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
- See chapter 19 of the ASX Listing Rules for defined terms.
- Financing facilities Note: the term “facility’ includes all forms of financing arrangements available to the entity. Add notes as necessary for an understanding of the sources of finance available to the entity.
Total facility amount at quarter end $US’000 Amount drawn at quarter end $US’000 7.1 Loan facilities 30,000 30,000 7.2 Credit standby arrangements - - 7.3 Other (please specify) - - 7.4 Total financing facilities 30,000 30,000
7.5 Unused financing facilities available at quarter end - 7.6 Include in the box below a description of each facility above, including the lender, interest rate, maturity date and whether it is secured or unsecured. If any additional financing facilities have been entered into or are proposed to be entered into after quarter end, include a note providing details of those facilities as well. During the quarter, the US$30 million Soul Patts Convertible Debt Facility announced in the prior quarter was fully drawn.
- Estimated cash available for future operating activities $US’000 8.1 Net cash from / (used in) operating activities (item 1.9) (11,464) 8.2 (Payments for exploration & evaluation classified as investing activities) (item 2.1(d))
8.3 Total relevant outgoings (item 8.1 + item 8.2) (11,464) 8.4 Cash and cash equivalents at quarter end (item 4.6) 33,613 8.5 Unused finance facilities available at quarter end (item 7.5) - 8.6 Total available funding (item 8.4 + item 8.5) 33,613
8.7 Estimated quarters of funding available (item 8.6 divided by item 8.3) 2.9 (refer to explanatory commentary below) Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”. Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
No. While the calculation presented in section 8.7 indicates that the Company currently
holds cash reserves sufficient for 2.9 additional quarters, it anticipates the
commencement of sales of uranium produced from Lance in the coming months.
These sales are expected to progressively shift net operating cash outflows to net
operating cash inflows in subsequent quarters, however, the Company notes that
the Lance Project and newly commissioned wellfields continue to be in the ramp-up
phase and the Company notes its announcement to the ASX on 28 September
2026 regarding current wellfield operational strategy and commissioning challenges.
Accordingly, the quantity and timing of Lance project uranium sales from production
may vary from that currently anticipated by the Company.
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
- See chapter 19 of the ASX Listing Rules for defined terms.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
Yes. See 8.8.1 above
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
Yes. See 8.8.1 above
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A. 2 This statement gives a true and fair view of the matters disclosed.
Date: 29 October 2026
Authorised by: The Board of Directors (Name of body or officer authorising release – see note 4)
Notes
- This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
- If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report. - Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.
- If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”. - If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.
ASX ANNOUNCEMENT (ASX: PEN)
29 October 2026
September 2026 Quarterly Activities Report
KEY POINTS
Lance Project, Wyoming, USA (PEN: 100%)
Strong operational progress on flow rates achieved at Lance at the back end of the
quarter, with revised wellfield operating strategies and development practices delivering
substantially improved flow rates across several header houses. The operational focus in the
December quarter is on translating these hydraulic gains into stronger and more consistent
uranium head grades.
Header Houses 15 and 17 delivered a significant improvement in flow performance, with
HH15 operating at approximately 370 GPM (gallons per minute) and HH17 achieving
approximately 500 GPM during acidification, broadly in line with or above their respective
targeted rates.
New recovery wells in HH14, HH16, HH12 delivered strong flow rates and encouraging
uranium concentrations, supporting the operating assessment that historical
underperformance is principally associated with localised well completion, wellfield design
and solution-management factors rather than a broad permeability constraint.
Owner-operated drilling performance continues to improve, with increasing rig
productivity and operating efficiencies expected to support lower wellfield development
costs as the drilling program advances.
Strengthened technical leadership and oversight, with the appointment of experienced
low-pH ISR uranium executive Gary Birch as Chief Technical Officer, establishment of a
Technical Committee and the engagement of specialist ISR consultants Rendement.
Lance Project Mineral Resource Estimate (“MRE”) increased to 59.0 million pounds
(“Mlbs”) U
3
O
8
, comprising 4.3Mlbs U
3
O
8
Measured, 12.9Mlbs U
3
O
8
Indicated and 41.7Mlbs
U
3
O
8
Inferred Resources.
Ross Mining Area Mineral Resource increased by 15.6% (1.0Mlbs U
3
O
8
) to 7.4Mlbs U
3
O
8
following delineation and development drilling associated with Mine Unit 4 (“MU4”).
Revised development strategy implemented prioritising MU-4 and future mine units, with
operational learnings being incorporated into the ongoing wellfield optimisation and
development planning.
CY2027 production guidance of 500-600klbs U
3
O
8
reconfirmed, supported by the
Company’s revised operational strategy. No production guidance in place for CY2026.
Corporate
Non-cash impairment expense of US$50.1 million recognised for FY2026 principally
relating to certain legacy wellfield development assets and other historically capitalised
costs at the Lance Project. The impairment is a non-cash accounting expense and has no
impact on Peninsula’s cash position or current funding arrangements.
Quarter-end cash balance of US$33.6 million, following full drawdown of the Soul Patts
Convertible Debt Facility during the quarter.
Peninsula Energy Limited and its wholly owned subsidiary, Strata Energy Inc. (together “Peninsula” or the “Company”) (ASX: PEN, OTCQB: PENMF) is pleased to provide its September 2026 Quarterly Activities Report.
Commenting on the September quarter, Peninsula Managing Director and CEO George Bauk said:
“The September quarter has been an important period of operational progress at Lance, with encouraging results from our revised wellfield operating strategies, new recovery wells and the continued development of the remaining wells and header houses within Mine Unit 4 – the immediate focus of our near-term operating strategy.
“While the production ramp-up is taking longer than anticipated, we are now seeing positive evidence that the changes we are implementing can deliver meaningful improvements in wellfield performance.
“The flow rates from Header Houses 15 and 17 have been particularly encouraging, with combined flow rates being consistent over time and in line with our original targets. We are also seeing positive results from the newly drilled recovery wells in Header Houses 12, 14 and 16 which are delivering strong flow rates and high uranium concentrations in areas that have previously experienced flow rate challenges.
“We are also encouraged by the improving performance of our owner-operated drilling capability, where increasing productivity is expected to support more efficient execution and improved cost performance as the wellfield development program progresses.
“These developments are providing valuable insights into the performance of the Lance wellfields and increasing our confidence in the opportunities to improve operating outcomes through better wellfield design, completion practices and management of leach chemistry. We recognise that further work is required to translate these improvements into consistent, sustainable uranium production – and that remains our overriding operational priority.
“Importantly, we have taken decisive steps to strengthen our technical capability, including the appointment of highly regarded uranium ISR expert Gary Birch as our Chief Technical Officer and the establishment of a Technical Committee, chaired by Keith Bowes, to provide enhanced technical oversight, governance and operational support. We have also appointed specialist uranium ISR consulting group, Rendement, to provide technical assistance and recommendations primarily focused on wellfield performance.
“Collectively, these initiatives will provide additional technical expertise, independent review and improved operating discipline as we continue to increase production at Lance and apply the lessons learned to future mine development.
“In addition, we were pleased to report an updated Mineral Resource Estimate for the Lance Project during the quarter, delivering a 15.6% increase in contained U 3 O 8 in the Ross area and a 1.7% increase across the combined project. This reinforces our substantial underlying uranium inventory and the long-term potential of the operation.
“Having spent most of the quarter on site in Wyoming with our staff on the ground and our technical resources, there is an air of confidence amongst the team that we have a much better understanding of how to more effectively operate the Lance wellfields using the low-pH extraction methodology. We are confident that the operational improvements now being implemented will translate into materially higher rates of uranium production in the coming months.
“Our focus is firmly on building a more reliable, efficient and sustainable uranium operation. We are encouraged by the progress being made, but we remain realistic about the work ahead. We look forward to
reporting further operational results as our improvement programs advance and we continue working towards our CY2027 production objectives.”
Commenting on the operational improvement program, Peninsula Non-Executive Director and Chair of the Technical Committee Keith Bowes said:
“Our initial focus has been on wellfield flow rates, with positive results being seen from changing the acidification methodology, improving the filtration processes and updating our operating and wellfield maintenance approach. These changes have not only led to sustained target level flow rates for the new Header Houses 15 and 17 but have also seen a return to higher flow rates for the other header houses in MU-4, some flow rates which we have not seen since January this year.
“Having the confidence now that we have restored and are maintaining flow rates, the focus is now shifting to uranium grade. First steps here include additional acid addition to progressively reduce wellfield pH towards the target of approximately 1.8 standard units (S.U.). Together with this, a well-by-well review looking at optimisation and improving contact with the mineralised formation is being undertaken which should support stronger, more consistent head grades from the wellfields.
Further improvement work is also being undertaken in the central processing plant where we are targeting improved utilisations and optimisations of both the resin elution and resin loading stages. The main focus here being minimising tails grades to ensure the ion exchange circuit is performing at maximum recovery and efficiency.”
LANCE PROJECT, WYOMING
Safety, Environmental and Regulatory Performance There was one employee Lost Time Injury (“LTI”) and one employee medical aid incident during the quarter. A rig operator was struck on the hand area when the pipe wrench hook failed while performing routine disconnecting of drill pipe during the tripping out process.
There were no reportable spills during the September quarter.
Due to the LTI and medical aid incident during the quarter, the site-wide rolling 12-month Total Recordable Injury Frequency Rate (“TRIFR”) at the end of the quarter increased to 6.69 from 5.83 at the end of the June 2026 quarter.
Commissioning Ramp-up Modified wellfield operating strategies, along with recent drilling and wellfield development activities, have delivered encouraging results across several header houses and providing additional data on wellfield performance. Initial indications are that the MU-4 flow rate issues previously encountered were transitional and operational in nature rather than fundamental issues with the orebody or recovery processes.
During the quarter, Peninsula drilled additional recovery wells within HH12, HH14 and HH16. Highlights include the flow rate in the additional recovery wells in HH12 (MU-3), which is up to three times the flow rate previously seen in MU-3, and the head grade in the additional recovery wells in HH14 which are above the average for the header house.
Management's assessment of these wells is that the issues experienced to date in these header houses i.e. low flow rates and low grades, are not associated with the broader mining zone characteristics, including formation permeability and mineralisation (which both remain intact), but rather challenges associated with wellfield design, localised well development issues, operating strategies and the applied method of
acidification and oxidisation. Ongoing drilling, wellfield development and operating data will be required to further test and refine this assessment.
Further investigation is underway to determine what additional actions can be taken within these header houses and what can potentially be applied to the other header houses.
HH15 commenced production on 2 September 2026 and is currently operating at ~370 GPM, with average operating well flow rates of ~12 GPM. This is lower than the targeted rate for this header house of 400 GPM (based on airlift values generated during construction) but remains at an acceptable level for effective operations. Hydrogen peroxide addition commenced when acidification of the header house was completed and flow from HH15 was turned to the central processing plant (“CPP”). Since commencement of peroxide addition, no gassing issues have been observed. HH15 was also the first header house to have the modified lixiviant filtration system applied.
HH17 commenced acidification on 10 September 2026 and is currently operating at ~500 GPM, with average operating well flow rates of ~15.6 GPM. This is above the targeted rate for this header house of 450 GPM (based on airlift values generated during construction). Flow rates have been limited to 500 GPM from the natural flow rate of ~550 GPM due to current capacity constraints within the dissolved air flotation (DAF) facility which is being utilised to manage solids within the lixiviant stream during the acidification phase. The DAF is also currently being used to mix soda ash which will be modified to get the DAF facility back to flow rate capacity of 1,000 GPM during the December quarter. HH17 remains in the early stages of acidification and is the first header house to follow the “soft acidification” start procedure whereby the acid tenor is ramped-up during the acidification process to help minimise calcite dissolution and better control acid consumption.
As part of ongoing cost optimisation initiatives, wells within MU-1 producing uranium concentrations below 30 mg/L have been temporarily taken offline. This decision reflects current sulfuric acid pricing and current CPPs tail grades and is designed to maximise wellfield economics by focusing operating resources and reagent consumption on higher-return production areas.
Further optimisation work is also planned for MU-3, where the construction of the wellfields has proven ineffective due to wider spaced patterns and well screening across multiple horizons. A modification to the design of these wellfields may be warranted.
Owner-Operated Drilling Peninsula’s owner-operated drill rig continued to advance wellfield development activities during the quarter with improving productivity evident as the operating team gained experience and refined drilling practices and work sequencing. The Company expects these productivity improvements to progressively translate into more efficient drilling execution and improved wellfield development cost performance.
Mineral Resource Update Peninsula reported an updated MRE for the Lance Project during the reporting period, comprising 53.9 million tonnes at an average grade of 0.050% U 3 O 8 for 59.0Mlbs of contained U 3 O 8 , representing a 1.7% increase from the previous Lance MRE of 58.0Mlbs.
The updated Lance MRE was prepared by independent consultant, WWC Engineering, in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 Edition (“JORC Code”) and is reported as at 31 December 2025 – see Table 1 below:
Table 1. Lance Project’s Classified Mineral Resource Estimate as at 31 December 2025
Resource
Classification
Tonnage
(Mt)
Average Grade
(% U
3
O
8
)
U
3
O
8
Metal
(Kt)
U
3
O
8
Metal
(Mlb)
Measured 3.8 0.052 2.0 4.3
Indicated 11.7 0.051 5.9 12.9
Inferred 38.5 0.049 18.9 41.7
Total 53.9 0.050 26.7 59.0
The resource estimate has been constrained using a GT contour of 0.2 and a grade cut-off of 200ppm U₃O₈.
These cut-offs are considered appropriate for the calculation and reporting of ISR resources at the Lance
Project. Resource grades have also been adjusted using an appropriate disequilibrium factor.
Importantly, the updated MRE incorporates a 15.6% increase in the Ross Mineral Resource to 7.4Mlbs U 3 O 8 , up from 6.4Mlbs U 3 O 8 previously. The increase follows delineation and development drilling associated with MU-4, which has enabled further geological interpretation and Mineral Resource estimation work at Ross.
The updated Ross MRE includes 5.9Mlbs U 3 O 8 in the higher confidence Measured and Indicated categories, comprising 2.2Mlbs U 3 O 8 Measured and 3.7Mlbs U 3 O 8 Indicated.
Full details of the updated MRE were provided in the Company’s ASX Announcement dated 25 September 2026.
Appointment of Interim Senior Vice President - Operations During the quarter, Mr Brian Pile was appointed as the Interim Senior Vice President – Operations following recent site organisational change. Brian has been with the Company over the past 5 years in roles such as VP – Projects and VP-Operations and has previous development and operating experience at Kazakhstan uranium ISR projects.
Appointment of Chief Technical Officer During the quarter, Peninsula appointed Mr Gary Birch as the Company’s Chief Technical Officer. Gary is a highly experienced uranium and ISR operations executive with extensive senior leadership experience at Energy Resources of Australia Limited and Heathgate Resources’ successful Beverley and Four Mile low- pH ISR uranium operations in South Australia. Since November 2019, he had served as Chief Operations Officer at Heathgate with responsibility for operations, maintenance, engineering, IT and projects.
Within his roles at Heathgate, Gary has been accountable for leadership and coaching of technical teams, leadership of the Heathgate engineering team and technical performance of the Beverley and Four Mile wellfields and processing plants. During his two-decade tenure at Heathgate, Gary was also accountable for the design and project implementation of the Four Mile West low-pH ISR uranium development.
Gary brings practical operating experience across low-pH ISR wellfields, plant operations, maintenance, engineering, project delivery, operational budgeting, safety and environmental compliance. In his role as Chief Technical Officer, he will work closely with the Technical Committee, the Lance operating team and executive management to strengthen technical discipline, accelerate operational improvements and support the Company’s production growth strategy.
Gary commenced employment with Peninsula on 28 September 2026.
Establishment of Technical Committee Peninsula has also established a Technical Committee to provide enhanced technical oversight, governance and operational support for the continued ramp-up of low-pH ISR operations at Lance.
The Technical Committee has been established as part of Peninsula’s broader operational improvement program following the Company’s recent operational and production guidance update. The Committee is providing structured reviews of operating performance, technical risks, optimisation opportunities and future mine development priorities across Lance, working closely with management and the Board to support operational execution and long-term production growth.
The Technical Committee is chaired by Peninsula Non-Executive Director Keith Bowes and provides independent review, constructive challenge and practical technical guidance across the Lance Project.
Keith is a mining executive and company director with more than 30 years of experience across exploration, project development and operations. His experience includes global uranium, mineral processing, hydrometallurgy, project development, capital markets and governance roles. He was previously Managing Director of Lotus Resources Limited (ASX: LOT) and has also been involved in various uranium project due diligences and restart strategies, including Boss Energy Limited’s (ASX: BOE) low-pH ISR Honeymoon Uranium Mine in South Australia.
The Committee’s initial areas of focus will include:
• Review of wellfield performance, solution flow, chemistry optimisation and production
improvement initiatives.
• Assessment of technical risks and improvement opportunities associated with low-pH ISR ramp-
up activities.
• Support for future mine unit development planning, including wellfield design, sequencing,
operating assumptions and technical readiness.
• Review of ion exchange and process plant performance, including recovery, resin loading, elution
and operating controls.
• Review of data, modelling, operational learnings and external technical recommendations to
ensure technical decisions are aligned with long-term value creation.
• Mentoring and capability-building support for Peninsula’s operational and technical teams.
Engagement of Rendement
Peninsula has engaged South Australian based specialist ISR consulting group Rendement to provide
technical consulting support. The initial scope of work will focus on diagnosing and addressing two priority
operational areas: reduced wellfield performance as a result of lower-than-expected flow rates, and
improvements in ion exchange (“IX”) performance.
The Rendement work program includes targeted data review, technical assessment, site visits, preliminary findings and a final technical report containing practical recommendations.
The engagement is led by Rendement principals James Davidson and Ben Jeuken. Mr Davidson is a Principal Process Engineer with more than 30 years of hydrometallurgical experience, including ISR uranium, ion exchange, leaching, process optimisation and senior operational leadership at the Honeymoon Uranium Mine. Mr Jeuken is a Principal Hydrogeologist with more than 20 years of experience in groundwater modelling, wellfield design, ISR optimisation, geochemistry, aquifer testing and regulatory support, including senior roles supporting Honeymoon, Beverley and other ISR projects.
Production Guidance Update As outlined in the June 2026 Quarterly Activities Report, the Company’s previously announced CY2026 production guidance of 400,000 to 500,000 pounds of U 3 O 8 was withdrawn due to the slower-than- expected ramp-up over the first half of the year.
As outlined above, the Company has seen encouraging operational progress over recent months, with CY2027 production guidance of 500,000 to 600,000 pounds of U 3 O 8 reconfirmed.
Uranium Production Uranium captured on resin during the quarter was lower than expected due to several operational factors;
MU-4 Performance (HH14 and HH16). Towards the end of September quarter, HH14 has
overcome the gassing issues which significantly impacted hydraulic performance and resulted in
limited uranium production. A number of modified wellfield maintenance procedures has proven
to be effective and during October (post September quarter), flow rates in HH14 have returned to
January 2026 levels, at approximately 400 GPM which is in line with the target of 375 GPM, 2
months later than expected as outlined in the announcement “Operational and Production
Guidance Update” dated 21 July 2026. Head grade is below forecast due to higher-than-targeted
pH levels which is currently being addressed with additional acid injection. HH16 continues to
improve, with current flows at approximately 280 GPM (with 5 wells off), approaching the flow rate
of 330 GPM. New wellfield maintenance strategies are being worked through HH16. Head grade is
below forecast and is being addressed with additional acid injection within both the plant injection
system at the CPP and direct acid injection at the header house, targeting wellfield patterns with
the highest pH levels through our dual injection manifold system.
MU-4 Performance (HH15), HH15 completed acidification on 2 September 2026. With the change
in the start-up of header houses, no hydrogen peroxide was injected during acidification and only
commenced on 2 September when the header house was turned to production. The positive
effect hydrogen peroxide on head grades is expected to commence during the December quarter.
Currently the flow rates within HH15 are approximately 380 GPM, which is close to the targeted
flow rate of 400 GPM. New wellfield maintenance techniques will be used within HH15 to assist
with increase in flow rate.
MU-4 Performance (HH17), HH17 commenced acidification on 3 September, with flow rates at
500 GPM, limited by the available DAF capacity of 500 GPM and has flowed up to 550 GPM in pre-
acidification phase.
MU-1 Performance, MU-1 has been scaled back to only operate individual patterns with a grade of
>30 mg/L. This is based on the availability of wellfield maintenance, tails grade and price of acid.
MU-3 Performance (HH12), HH12 is below target due to focus on MU-4. Four new recovery wells
have been installed during the quarter, contributing 50 GPM (12 GPM per well) which is the best
flow per well seen within MU-3 to date. This has been attributed to a number of factors, including
new well installation methodology and targeting no more than 2 ore horizons. Good grades have
been reported within these 4 wells. These results have provided renewed confidence within MU-3
and work is underway to redesign HH13 which has excellent pounds under pattern and look to add
to the production profile in CY2027 along with some patterns within HH12.
In summary, the primary focus during the quarter has been on flow rates which has yielded positive outcomes, including the elimination of gassing within HH14 and no gassing seen to date in HH15 and HH17. The new standard operating procedures have seen positive results however they have added time to completing acidification in HH15 and extended the delay to the start of HH17. The approach is to ensure strong consistent flow rates during acidification and production.
Production & Sales: 1Q27 Sep-26 YTD FY27 4Q26 Jun-26 3Q26 Mar-26 2Q26 Dec-25 1Q26 Sep-25 FY26 Pounds captured on resin 17,968 17,968 13,889 3,972 7,369 101 25,331 Pounds drummed 15,588 15,588 11,482 2,067 3,000 836 17,385 Pounds delivered to converter
-
- 10,596 - - - - Produced pounds sold - - 10,066 - - - - Non-produced pounds purchased/borrowed
Non-produced pounds sold - - - - - - -
U
3
O
8
Inventory:
As at
30 September 2026
Pounds in circuit 18,926
Pounds drummed at site 32,974
Pounds drummed at converter 530
Production for the quarter came from MU-1 (Header Houses 1, 2 and 3), MU-3 (Header Houses 11 and 12) and MU-4 (Header Houses 14, 16 and 15). Uranium-rich solution from Header House 15 was turned to the CPP on 2 September 2026 following the completion of acidification with hydrogen peroxide added from 2 September 2026. Header House 17 started acidification on 10 September 2026.
CORPORATE
Non-Cash Impairment As part of the completion of its financial statements for the year ended 30 June 2026, the Company recognised a non-cash impairment expense of US$50.1 million relating to certain legacy wellfield development assets and other historically capitalised costs at the Lance Project.
The impairment follows the operational review of Lance completed in July 2026 and the subsequent decision to prioritise operational and technical resources towards the ongoing development and operation of MU-4 and future mine development, as outlined in the Company’s Operational and Production Guidance Update released on 22 July 2026.
The impairment is a non-cash accounting expense and has no impact on Peninsula’s cash position or current funding arrangements.
Importantly, the impairment is also specific to these particular assets and does not represent an impairment of the broader Lance Project. Peninsula continues to expect substantial future economic benefits from MU-4, future mine units and the Lance Project as a whole.
Surety Bond Security During the quarter, the Company’s surety bond provider requested an increase in the cash collateral supporting the surety bonds currently on issue. The Company is actively engaging with its existing provider regarding the proposed increase and is also evaluating alternative surety bond providers with the objective of minimising any additional cash collateral requirements while maintaining appropriate bonding capacity.
Change of Share Registry
Effective Monday 14 September 2026, Peninsula has changed its provider for shareholder registry services
from MUFG Corporate Markets (AU) Limited to Automic Pty Ltd (“Automic”).
Peninsula’s new Share registry contact details are as follows:
Automic
Level 5, 126 Phillip Street
Sydney NSW 2000
GPO Box 5193
Sydney NSW 2001
Shareholders can easily and efficiently manage their holdings via Automic’s secure and highly accessible online investor portal. The portal provides, among other things, an online interface to update and manage shareholder details, view balances and transaction history.
Shareholders that are not already a user of Automic’s investor portal may visit https://investor.automic.com.au and signup to register their details using the three simple steps provided in the setup process.
Shareholders with any queries in relation to their Peninsula holding are advised to contact Automic at [email protected] or on 1300 288 664 (within Australia) or +61 2 9698 5414 (outside Australia).
Cash Position The Company’s available cash at the end of the quarter was US$33.6 million.
Payments to Related Parties Payments to related parties during the quarter as outlined in Sections 6.1 and 6.2 of Appendix 5B consisted of US$335,000 in directors’ fees and payments to executive directors under respective service agreements.
– ENDS –
This release has been approved by Peninsula’s Board of Directors.
Peninsula Energy Limited ACN 062 409 303
Notice of Annual General Meeting
The Annual General Meeting of the Company will be held at:
Time: 9.00am (AWST) on Monday, 23 November 2026
Location: BDO Jarrah Room Level 9 Mia Yellagonga Tower 2 5 Spring Street PERTH WA 6000
The Notice of Annual General Meeting should be read in its entirety. If Shareholders are in doubt as to how to vote, they should seek advice from their suitably qualified advisor prior to voting. Should you wish to discuss any matter, please do not hesitate to contact the Company by telephone on +61 8 9380 9920.
Shareholders are urged to vote by lodging the Proxy Form.
Page 2
Peninsula Energy Limited
ACN 062 409 303
(Company)
Notice of Annual General Meeting
Notice is hereby given that the annual general meeting of Shareholders of Peninsula Energy Limited (Company)
will be held at BDO, Jarrah Room, Level 9, Mia Yellagonga Tower 2, 5 Spring Street, Perth, WA 6000 on
Monday, 23 November 2026 at 9.00am (AWST) (Meeting).
The Explanatory Memorandum provides additional information on matters to be considered at the Meeting. The
Explanatory Memorandum and the Proxy Form, form part of the Notice.
The Directors have determined pursuant to regulation 7.11.37 of the Corporations Regulations 2001 (Cth) that
the persons eligible to vote at the Meeting are those who are registered as Shareholders on Saturday, 21
November 2026 at 9.00am (AWST).
Terms and abbreviations used in the Notice are defined in Schedule 1.
Agenda
1 Annual Report
To consider the Annual Report of the Company and its controlled entities for the financial year ended
30 June 2026, which includes the Financial Report, the Directors’ Report and the Auditor’s Report.
Note: there is no requirement for Shareholders to approve the Annual Report.
2 Resolutions
Resolution 1 – Remuneration Report
To consider and, if thought fit, to pass with or without amendment, as a non-binding ordinary resolution
the following:
‘That, the Remuneration Report be adopted by Shareholders, on the terms and conditions in the
Explanatory Memorandum.’
Note: a vote on this Resolution is advisory only and does not bind the Directors or the Company.
Resolution 2 – Re-Election of Director – David Coyne
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the
following:
‘That, David Coyne, who retires in accordance with Article 47 of the Constitution, Listing Rule 14.5 and
for all other purposes, retires and, being eligible and offering himself for re-election, is re-elected as a
Director, on the terms and conditions in the Explanatory Memorandum.’
Page 3
Resolution 3 – Approval of 10% Placement Facility
To consider and, if thought fit, to pass with or without amendment, as a special resolution the following:
‘That, pursuant to and in accordance with Listing Rule 7.1A and for all other purposes, Shareholders
approve the issue of Equity Securities totalling up to 10% of the issued capital of the Company at the
time of issue, calculated in accordance with the formula prescribed in Listing Rule 7.1A.2 and on the
terms and conditions in the Explanatory Memorandum.’
Resolution 4 – Approval to issue MD Performance Rights
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the
following:
‘That, pursuant to and in accordance with Listing Rule 10.14 and for all other purposes, Shareholders
approve the issue of up to 1,438,432 MD Performance Rights to George Bauk (or his nominees) under
the Plan, on the terms and conditions in the Explanatory Memorandum.’
Resolution 5 – Approval to increase Non-Executive Directors’ Remuneration
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the
following:
‘That, pursuant to and in accordance with Article 50 of the Constitution, Listing Rule 10.17 and for all
other purposes, Shareholders approve an increase of the maximum total aggregate amount of fees
payable to Non-Executive Directors to $800,000 per annum, on the terms and conditions in the
Explanatory Memorandum.’
Resolution 6 – Ratification of issue of Employee Performance Rights
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the
following:
‘That, pursuant to and in accordance with Listing Rule 7.4 and for all other purposes, Shareholders
ratify the issue of 4,812,577 Employee Performance Rights issued to certain unrelated officers and
employees of the Company or its subsidiaries (or their respective nominees) under the Plan, on the
terms and conditions in the Explanatory Memorandum.’
Resolution 7 – Re-insertion of Proportional Takeover Bid Approval Provisions
To consider and, if thought fit, to pass with or without amendment, as a special resolution the following:
‘That, the modification of the Constitution to re-insert the proportional takeover bid approval provisions
contained in Articles 79 and 80 of the Constitution for a period of three years from the date of approval
of this Resolution is approved under and for the purposes of sections 648G(4) and 136(2) of the
Corporations Act and for all other purposes.’
Page 4
3 Voting prohibitions
Resolution 1: In accordance with sections 250BD and 250R of the Corporations Act, a vote on this
Resolution must not be cast (in any capacity) by or on behalf of a member of the Key Management
Personnel details of whose remuneration are included in the Remuneration Report, or a Closely Related
Party of such a member.
A vote may be cast by such person if the vote is not cast on behalf of a person who is excluded from
voting on this Resolution, and:
(a) the person is appointed as a proxy by writing that specifies the way the proxy is to vote on this
Resolution; or
(b) the voter is the Chair and the appointment of the Chair as proxy does not specify the way the
proxy is to vote on this Resolution, but expressly authorises the Chair to exercise the proxy
even if this Resolution is connected with the remuneration of a member of the Key Management
Personnel.
Resolution 4, Resolution 5 and Resolution 6: In accordance with section 250BD of the Corporations
Act, a person appointed as a proxy must not vote on the basis of that appointment, on these Resolutions
if:
(a) the proxy is either a member of the Key Management Personnel or a Closely Related Party of
such member; and
(b) the appointment does not specify the way the proxy is to vote on this Resolution.
However, the above prohibition does not apply if:
(a) the proxy is the Chair; and
(b) the appointment expressly authorises the Chair to exercise the proxy even though the
Resolution is connected directly or indirectly with remuneration of a member of the Key
Management Personnel.
If you purport to cast a vote other than as permitted above, that vote will be disregarded by the Company
(as indicated above) and you may be liable for breaching the voting restrictions that apply to you under
the Corporations Act.
4 Voting exclusions
Pursuant to the Listing Rules, the Company will disregard any votes cast in favour of:
(a) Resolution 3: if at the time of the Meeting, the Company is proposing to make an issue of
Equity Securities under Listing Rule 7.1A.2, by or on behalf of any persons who are expected
to participate in, or who will obtain a material benefit as a result of, the proposed issue (except
a benefit solely by reason of being a Shareholder), or any of their respective associates;
(b) Resolution 4: by or on behalf of George Bauk (or his nominees), and any other person referred
to in Listing Rules 10.14.1, 10.14.2 or 10.14.3 who is eligible to participate in the Plan, or any
of their respective associates;
(c) Resolution 5: by or on behalf of all Directors, or any of their respective associates; and
Page 5
(d) Resolution 6: by or on behalf of any person who participated in the issue of these Employee
Performance Rights, or any of their respective associates.
The above voting exclusions do not apply to a vote cast in favour of the relevant Resolution by:
(a) a person as proxy or attorney for a person who is entitled to vote, in accordance with directions
given to the proxy or attorney to vote on the Resolution in that way;
(b) the Chair as proxy or attorney for a person who is entitled to vote, in accordance with a direction
given to the Chair to vote on the Resolution as the Chair decides; or
(c) a holder acting solely in a nominee, trustee, custodial or other fiduciary capacity on behalf of a
beneficiary provided the following conditions are met:
(i) the beneficiary provides written confirmation to the holder that the beneficiary is not
excluded from voting, and is not an associate of a person excluded from voting, on the
Resolution; and
(ii) the holder votes on the Resolution in accordance with directions given by the
beneficiary to the holder to vote in that way.
BY ORDER OF THE BOARD
Jonathan Whyte
Company Secretary
Peninsula Energy Limited
Dated: 13 October 2026
Page 6
Peninsula Energy Limited ACN 062 409 303 (Company) Explanatory Memorandum
- Introduction
The Explanatory Memorandum has been prepared for the information of Shareholders in
connection with the business to be conducted at the Meeting to be held at BDO, Jarrah Room,
Level 9, Mia Yellagonga Tower 2, 5 Spring Street, Perth, WA 6000 on Monday, 23 November
2026 at 9.00am (AWST).
The Explanatory Memorandum forms part of the Notice which should be read in its entirety. The Explanatory Memorandum contains the terms and conditions on which the Resolutions will be voted. The Explanatory Memorandum includes the following information to assist Shareholders in deciding how to vote on the Resolutions: Section 2 Action to be taken by Shareholders Section 3 Annual Report Section 4 Resolution 1 – Remuneration Report Section 5 Resolution 2 – Re-Election of Director – David Coyne Section 6 Resolution 3– Approval of 10% Placement Facility Section 7 Resolution 4 – Approval to issue MD Performance Rights Section 8 Resolution 5 – Approval to increase Non-Executive Directors’ Remuneration Section 9 Resolution 6 – Ratification of issue of Employee Performance Rights Section 10 Resolution 7 – Re-insertion of Proportional Takeover Bid Approval Provisions Schedule 1 Definitions Schedule 2 Summary of material terms of the Plan Schedule 3 Terms and conditions of the Performance Rights Schedule 4 Valuation of the MD Performance Rights A Proxy Form is made available with this Notice.
Page 7
- Action to be taken by Shareholders
Shareholders should read the Notice including the Explanatory Memorandum carefully before
deciding how to vote on the Resolution.
2.1 Voting in person
To vote in person, attend the Meeting on the date and at the place set out above.
2.2 Voting by a corporation
A Shareholder that is a corporation may appoint an individual to act as its representative and
vote in person at the Meeting. The appointment must comply with the requirements of
section 250D of the Corporations Act. The representative should bring to the Meeting evidence
of his or her appointment, including any authority under which it is signed.
2.3 Voting by proxy
A Proxy Form is made available with the Notice. This is to be used by Shareholders if they wish to appoint a representative (a 'proxy') to vote in their place. All Shareholders are invited and encouraged to attend the Meeting or, if they are unable to attend in person, sign and return the Proxy Form to the Company in accordance with the instructions thereon. Lodgement of a Proxy Form will not preclude a Shareholder from attending and voting at the Meeting in person. Please note that: (a) a member of the Company entitled to attend and vote at the Meeting is entitled to appoint a proxy; (b) a proxy need not be a member of the Company; and (c) a member of the Company entitled to cast two or more votes may appoint two proxies and may specify the proportion or number of votes each proxy is appointed to exercise, but where the proportion or number is not specified, each proxy may exercise half of the votes. The Proxy Form provides further details on appointing proxies and lodging Proxy Forms. Section 250BB(1) of the Corporations Act provides that an appointment of a proxy may specify the way the proxy is to vote on a particular resolution and, if it does:
(a) the proxy need not vote on a show of hands, but if the proxy does so, the proxy must vote that way (i.e. as directed);
(b) if the proxy has 2 or more appointments that specify different ways to vote on the resolution – the proxy must not vote on a show of hands;
(c) if the proxy is the chair of the meeting at which the resolution is voted on – the proxy must vote on a poll, and must vote that way (i.e. as directed); and
(d) if the proxy is not the chair – the proxy need not vote on the poll, but if the proxy does so, the proxy must vote that way (i.e. as directed).
Page 8
Section 250BC of the Corporations Act provides that, if:
(a) an appointment of a proxy specifies the way the proxy is to vote on a particular resolution
at a meeting of the company's members;
(b) the appointed proxy is not the chair of the meeting;
(c) at the meeting, a poll is duly demanded, or is otherwise required under section 250JA
on the resolution; and
(d) either the proxy is not recorded as attending the meeting or the proxy does not vote on
the resolution,
the chair of the meeting is taken, before voting on the resolution closes, to have been appointed
as the proxy for the purposes of voting on the resolution at the meeting.
To vote by proxy, your proxy voting instruction must be received by 9.00am (AWST) on
Saturday, 21 November 2026, being not later than 48 hours before the commencement of the
Meeting. Proxy Forms received later than this time will be invalid.
2.4 Chair's voting intentions
If the Chair is your proxy, either by appointment or by default, and you have not indicated your
voting intention, you expressly authorise the Chair to exercise the proxy in respect of Resolution
1, Resolution 4, Resolution 5 and Resolution 6 even though these Resolutions are connected
directly or indirectly with the remuneration of the Company's Key Management Personnel.
The Chair intends to exercise all available proxies in favour of all Resolutions, unless the
Shareholder has expressly indicated a different voting intention. In exceptional circumstances,
the Chair of the Meeting may change their voting intention on any Resolution, in which case an
ASX announcement will be made.
2.5 Submitting questions
Shareholders may submit questions in advance of the Meeting to the Company. Questions must
be submitted by emailing the Company Secretary at [email protected] at least 5 Business Days
before the Meeting.
Shareholders will also have the opportunity to submit questions during the Meeting in respect
to the formal items of business. In order to ask a question during the Meeting, please follow the
instructions from the Chair.
The Chair will attempt to respond to the questions during the Meeting. The Chair will request
prior to a Shareholder asking a question that they identify themselves (including the entity name
of their shareholding and the number of Shares they hold).
3. Annual Report
In accordance with section 317 of the Corporations Act, Shareholders will be offered the
opportunity to discuss the Annual Report, including the Financial Report, the Directors’ Report
and the Auditor's Report for the financial year ended 30 June 2026.
There is no requirement for Shareholders to approve the Annual Report.
Page 9
At the Meeting, Shareholders will be offered the opportunity to:
(a) discuss the Annual Report which is available online at https://www.pel.net.au/;
(b) ask questions about, or comment on, the management of the Company; and
(c) ask the auditor questions about the conduct of the audit and the preparation and content
of the Auditor’s Report.
In addition to taking questions at the Meeting, written questions to the Chair about the
management of the Company, or to the Company's auditor about:
(a) the preparation and content of the Auditor's Report;
(b) the conduct of the audit;
(c) accounting policies adopted by the Company in relation to the preparation of the
financial statements; and
(d) the independence of the auditor in relation to the conduct of the audit,
may be submitted no later than 5 Business Days before the Meeting to the Company Secretary
at the Company’s registered office.
The Company will not provide a hard copy of the Company’s Annual Report to Shareholders
unless specifically requested to do so.
4. Resolution 1 – Remuneration Report
4.1 General
In accordance with section 250R(2) of the Corporations Act, the Company must put the
Remuneration Report to the vote of Shareholders. The Directors’ Report for the year ended
30 June 2026 in the 2026 Annual Report contains the Remuneration Report which sets out the
remuneration policy for the Company and the remuneration arrangements in place for the
executive Directors, specified executives and non-executive Directors.
In accordance with section 250R(3) of the Corporations Act, Resolution 1 is advisory only and
does not bind the Directors. If Resolution 1 is not passed, the Directors will not be required to
alter any of the arrangements in the Remuneration Report.
If the Company's Remuneration Report receives a 'no' vote of 25% or more (Strike) at two
consecutive annual general meetings, Shareholders will have the opportunity to remove the
whole Board, except the managing director (if any).
Where a resolution on the Remuneration Report receives a Strike at two consecutive annual
general meetings, the Company will be required to put to Shareholders at the second annual
general meeting a resolution on whether another meeting should be held (within 90 days) at
which all Directors (other than the Managing Director, if any) who were in office at the date of
approval of the applicable Directors' Report must stand for re-election.
The Company's Remuneration Report did not receive a Strike at the 2025 annual general
meeting held on 27 November 2025. If the Remuneration Report receives a Strike at this
Meeting, Shareholders should be aware that if a second Strike is received at the 2027 annual
general meeting, this may result in the re-election of the Board.
Page 10
The Chair will allow a reasonable opportunity for Shareholders as a whole to ask about or make
comments on the Remuneration Report.
4.2 Additional information
Resolution 1 is an ordinary resolution.
Given the personal interests of all Directors in the outcome of this Resolution, the Board declines
to make a recommendation to Shareholders regarding this Resolution.
5. Resolution 2 – Re-Election of Director – David Coyne
5.1 General
Listing Rule 14.5 provides that there must be an election of directors at each annual general
meeting of the Company. In accordance with Article 47(b) of the Constitution, if no Director
would otherwise be required to retire pursuant to Article 47(a) of the Constitution, then this
requirement can be satisfied by any Director who wishes to retire and is otherwise the Director
who has held office the longest since his or her last election or appointment to that office, or if
two or more Directors have held office for the same period of time, the Director determined by
lot, unless those Directors agree otherwise.
Article 47(b) of the Constitution provides that a Director who retires pursuant to Article 47(b) of
the Constitution holds office as a Director until the end of the meeting at which the Director
retires and is eligible for re-election.
David Coyne was last elected at the Company’s annual general meeting held on 21 November
2024 and is the Director who has held office the longest without re-election. Accordingly, Mr
Coyne retires at this Meeting and, being eligible, seeks re-election pursuant to this Resolution
2.
If Resolution 2 is passed, Mr Coyne will be re-elected as a Director of the Company with effect
from the conclusion of the Meeting.
If Resolution 2 is not passed, Mr Coyne will not be re-elected as a Director of the Company.
5.2 David Coyne
Mr Coyne has over 30 years’ experience in the mining, engineering and construction industries,
both within Australia and internationally. Between 2013 and 2020, Mr Coyne was CFO / Finance
Director for the Company and has significant experience of the history and operations of the
Lance Project.
Mr Coyne was recently an Executive Director and Joint Company Secretary of Spartan
Resources Limited and previously served on the Board of listed iron ore miner BC Iron Limited.
Mr Coyne previously held executive positions with Australian listed companies Macmahon
Holdings Limited, VDM Group Limited, Red 5 Limited and unlisted global manganese miner
Consolidated Minerals. Over the past 15 years, Mr Coyne has been directly involved in a number
of equity and debt raising transactions and M&A transactions.
Mr Coyne is currently a Non-Executive Director of Torque Metals Limited. Mr Coyne does not
currently hold any other material directorships, other than as disclosed in this Notice.
Page 11
If re-elected, Mr Coyne is considered by the Board (with Mr Coyne abstaining) to be an
independent Director. Mr Coyne is not considered by the Board to hold any interest, position or
relationship that might influence, or reasonably be perceived to influence, in a material respect
his capacity to bring an independent judgment to bear on issues before the Board and to act in
the best interests of the entity as a whole rather than in the interests of an individual
securityholder or other party.
Mr Coyne has acknowledged to the Company that he will have sufficient time to fulfil his
responsibilities as a Director.
5.3 Board recommendation
The Board (with Mr Coyne abstaining) supports the re-election of Mr Coyne and recommends
that Shareholders vote in favour of Resolution 2 for the following reasons:
(a) Mr Coyne’s extensive skills and experience in the mining, engineering and construction
industries, both within Australia and internationally are valuable to the Board’s existing
skills and experience;
(b) Given his prior executive role with the Company, Mr Coyne has significant history and
experience with the Company’s flagship Lance Project; and
(c) Mr Coyne’s continuing role as a member of the Board will benefit the Company.
5.4 Additional information
Resolution 2 is an ordinary resolution.
6. Resolution 3– Approval of 10% Placement Facility
6.1 General
Listing Rule 7.1A enables an eligible entity to issue Equity Securities up to 10% of its issued
share capital through placements over a 12-month period after the annual general meeting (10%
Placement Facility). The 10% Placement Facility is in addition to the Company’s 15% annual
placement capacity under Listing Rule 7.1.
Resolution 3 seeks Shareholder approval to provide the Company with the ability to issue Equity
Securities under the 10% Placement Facility during the 10% Placement Period (refer to Section
6.2(f) below). The number of Equity Securities to be issued under the 10% Placement Facility
will be determined in accordance with the formula prescribed in Listing Rule 7.1A.2 (refer to
Section 6.2(c) below).
If Resolution 3 is passed, the Company will be able to issue Equity Securities up to the combined
25% limit in Listing Rules 7.1 and 7.1A without any further Shareholder approval.
If Resolution 3 is not passed, the Company will not be able to access the additional 10% capacity
to issue Equity Securities without Shareholder approval provided for in Listing Rule 7.1A and
will remain subject to the 15% limit on issuing Equity Securities without Shareholder approval in
Listing Rule 7.1.
6.2 Listing Rule 7.1A
(a) Is the Company an eligible entity?
Page 12
An eligible entity for the purposes of Listing Rule 7.1A is an entity that is not included in
the S&P/ASX 300 Index and has a market capitalisation of $300 million or less.
The Company is an eligible entity as it is not included in the S&P/ASX 300 Index and
has a market capitalisation of approximately $102.8 million, based on the closing price
of Shares ($0.18) on 13 October 2026.
(b) What Equity Securities can be issued?
Any Equity Securities issued under the 10% Placement Facility must be in the same
class as an existing quoted class of Equity Securities of the eligible entity.
As at the date of the Notice, the Company has on issue one quoted class of Equity
Securities, being Shares.
(c) How many Equity Securities can be issued?
Listing Rule 7.1A.2 provides that under the approved 10% Placement Facility, the
Company may issue or agree to issue a number of Equity Securities calculated in
accordance with the following formula:
(A x D) – E
Where:
A = is the number of Shares on issue at the commencement of the Relevant Period:
(A) plus the number of fully paid Shares issued in the Relevant Period
under an exception in Listing Rule 7.2 other than exceptions 9, 16 or
17;
(B) plus the number of fully paid Shares issued in the Relevant Period on
the conversion of convertible securities within Listing Rule 7.2 exception
9 where:
(1) the convertible securities were issued or agreed to be issued
before the commencement of the Relevant Period; or
(2) the issue of, or agreement to issue, the convertible securities
was approved, or taken under the Listing Rules to have been
approved, under Listing Rule 7.1 or Listing Rule 7.4;
(C) plus the number of fully paid Shares issued in the Relevant Period
under an agreement to issue securities within Listing Rule 7.2 exception
16 where:
(1) the agreement was entered into before the commencement of
the Relevant Period; or
(2) the agreement or issue was approved, or taken under the
Listing Rules to have been approved, under Listing Rule 7.1 or
Listing Rule 7.4;
(D) plus the number of partly paid Shares that became fully paid Shares in
the Relevant Period;
Page 13
(E) plus the number of fully paid Shares issued in the Relevant Period with
approval under Listing Rules 7.1 and 7.4; and
(F) less the number of fully paid Shares cancelled in the Relevant Period.
Note that 'A' has the same meaning in Listing Rule 7.1 when calculating the
Company's 15% annual placement capacity, and ‘Relevant Period’ has the
relevant meaning given in Listing Rules 7.1 and 7.1A.2, namely, the 12 month-
period immediately preceding the date of the issue or agreement.
D = is 10%.
E = is the number of Equity Securities issued or agreed to be issued under Listing
Rule 7.1A.2 in the Relevant Period where the issue or agreement to issue has
not been subsequently approved by the holders of its ordinary securities under
Listing Rule 7.4.
(d) What is the interaction with Listing Rule 7.1?
The Company's ability to issue Equity Securities under Listing Rule 7.1A will be in
addition to its 15% annual placement capacity under Listing Rule 7.1.
(e) At what price can the Equity Securities be issued?
Any Equity Securities issued under Listing Rule 7.1A must be issued for a cash
consideration per Equity Security which is not less than 75% of the VWAP of Equity
Securities in the same class calculated over the 15 Trading Days on which trades in
that class were recorded immediately before:
(i) the date on which the price at which the Equity Securities are to be issued is
agreed by the Company and the recipient of the Equity Securities; or
(ii) if the Equity Securities are not issued within 10 Trading Days of the date in
Section 6.2(e)(i) above, the date on which the Equity Securities are issued,
(Minimum Issue Price).
(f) When can Equity Securities be issued?
Shareholder approval of the 10% Placement Facility under Listing Rule 7.1A will be valid
from the date of the Meeting and will expire on the earlier of:
(i) the date that is 12 months after the date of the Meeting;
(ii) the time and date of the Company's next annual general meeting; or
(iii) the time and date of Shareholder approval of a transaction under Listing Rules
11.1.2 (a significant change to the nature or scale of activities) or 11.2 (disposal
of main undertaking),
(10% Placement Period).
(g) What is the effect of Resolution 3?
The effect of Resolution 3 will be to allow the Company to issue the Equity Securities
under Listing Rule 7.1A during the 10% Placement Period without further Shareholder
approval or using the Company’s 15% annual placement capacity under Listing Rule
7.1.
Page 14
6.3 Specific information required by Listing Rule 7.3A
Pursuant to and in accordance with Listing Rule 7.3A, the following information is provided in
relation to the 10% Placement Facility:
(a) Final date for issue
The Company will only issue the Equity Securities under the 10% Placement Facility
during the 10% Placement Period (refer to Section 6.2(f) above).
(b) Minimum issue price
Where the Company issues Equity Securities under the 10% Placement Facility, it will
only do so for cash consideration, and the issue price will be not less than the Minimum
Issue Price (refer to Section 6.2(e) above).
(c) Purposes of issues under the 10% Placement Facility
The Company may seek to issue Equity Securities under the 10% Placement Facility
for the purposes of raising funds for continued investment in the Company's current
assets, the acquisition of new assets or investments (including expenses associated
with such an acquisition), and/or for general working capital.
(d) Risk of economic and voting dilution
Shareholders should note that there is a risk that:
(i) the market price for the Company’s Equity Securities may be significantly lower
on the date of the issue of the Equity Securities than on the date of the Meeting;
and
(ii) the Equity Securities may be issued at a price that is at a discount to the market
price for the Company's Equity Securities on the issue date,
which may have an effect on the amount of funds raised by the issue of the Equity
Securities.
If this Resolution 3 is approved by Shareholders and the Company issues Equity
Securities under the 10% Placement Facility, the existing Shareholders’ economic and
voting power in the Company may be diluted as shown in the below table (in the case
of convertible securities only if those convertible securities are converted into Shares).
The table below shows the dilution of existing Shareholders based on the current market
price of Shares and the current number of Shares for Variable 'A' calculated in
accordance with the formula in Listing Rule 7.1A.2 (refer to Section 6.2(c) above) as at
the date of this Notice (Variable A), with:
(i) two examples where Variable A has increased, by 50% and 100%; and
(ii) two examples of where the issue price of Shares has decreased by 50% and
increased by 100% as against the current market price.
Page 15
Shares
(Variable A in
Listing
Rule 7.1A.2)
Dilution
Issue price
per Share
$0.09
50% decrease
in Current
Market Price
$0.18
Current Market
Price
$0.36
100% increase
in Current
Market Price
571,565,353
Shares
Variable A
10% Voting
Dilution
57,156,535
Shares
57,156,535
Shares
57,156,535
Shares
Funds raised $5,144,088 $10,288,176 $20,576,353
857,348,030
Shares
50% increase
in Variable A
10% Voting
Dilution
85,734,803
Shares
85,734,803
Shares
85,734,803
Shares
Funds raised
$7,716,132 $15,432,264 $30,864,529
1,143,130,706
Shares
100% increase
in Variable A
10% Voting
Dilution
114,313,071
Shares
114,313,071
Shares
114,313,071
Shares
Funds raised
$10,288,176 $20,576,353 $41,152,706
Notes:
- The table has been prepared on the following assumptions:
(a) The issue price is the current market price ($0.18), being the closing price of the
Shares on ASX on 13 October 2026, being the latest practicable date before this
Notice was signed.
(b) Variable A comprises of 571,565,353 existing Shares on issue as at the date of this Notice, assuming the Company has not issued any Shares in the 12 months prior to the Meeting that were not issued under an exception in Listing Rule 7.2 or with Shareholder approval under Listing Rules 7.1 and 7.4. (c) The Company issues the maximum number of Equity Securities available under the 10% Placement Facility. (d) No convertible securities (including any issued under the 10% Placement Facility) are exercised or converted into Shares before the date of the issue of the Equity Securities. (e) The issue of Equity Securities under the 10% Placement Facility consists only of Shares. If the issue of Equity Securities includes quoted Options, it is assumed that those quoted Options are exercised into Shares for the purpose of calculating the voting dilution effect on existing Shareholders. - The number of Shares on issue (i.e. Variable A) may increase as a result of issues of Shares that do not require Shareholder approval (for example, a pro rata entitlements issue, scrip issued under a takeover offer or upon exercise of convertible securities) or future specific placements under Listing Rule 7.1 that are approved at a future Shareholders’ meeting. The 10% voting dilution reflects the aggregate percentage dilution against the issued Share capital at the time of issue. This is why the voting dilution is shown in each example as 10%. The table does not show an example of dilution that may be caused to a particular Shareholder by reason of placements under the 10% Placement Facility, based on that Shareholder's holding at the date of the Meeting.
Page 16
The table shows only the effect of issues of Equity Securities under Listing Rule 7.1A, not
under the 15% placement capacity under Listing Rule 7.1.
(e) Allocation policy
The Company's allocation policy is dependent on the prevailing market conditions at the
time of any proposed issue pursuant to the 10% Placement Facility. The identity of the
allottees of Equity Securities will be determined on a case-by-case basis having regard
to the factors including but not limited to the following:
(i) the methods of raising funds that are available to the Company, including but
not limited to, rights issues or other issues in which existing Shareholders can
participate;
(ii) the effect of the issue of the Equity Securities on the control of the Company;
(iii) financial situation and solvency of the Company; and
(iv) advice from corporate, financial and broking advisers (if applicable).
The allottees under the 10% Placement Facility have not been determined as at the
date of this Notice but may include existing substantial Shareholders and/or new
investors who are not related parties of or associates of a related party of the Company.
(f) Issues in the past 12 months
The Company previously obtained approval from its Shareholders pursuant to Listing
Rule 7.1A at its annual general meeting held on 27 November 2025.
In the 12 months preceding the date of the Meeting and as at the date of this Notice,
the Company has not issued or agreed to issue Equity Securities under Listing Rule
7.1A.
At the date of this Notice, the Company is not proposing to make an issue of Equity
Securities under Listing Rule 7.1A and has not approached any particular existing
Shareholder or security holder or an identifiable class of existing security holder to
participate in any such issue.
However, in the event that between the date of this Notice and the date of the Meeting,
the Company proposes to make an issue of Equity Securities under Listing Rule 7.1A
to one or more existing Shareholders, those Shareholders’ votes will be excluded under
the voting exclusion statement in the Notice.
6.4 Additional information
Resolution 3 is a special resolution and therefore requires approval of 75% of the votes cast by
Shareholders present and eligible to vote (in person, by proxy, by attorney or, in the case of a
corporate Shareholder, by a corporate representative).
The Board recommends that Shareholders vote in favour of Resolution 3.
Page 17
- Resolution 4 – Approval to issue MD Performance Rights
7.1 General
The Company is proposing, subject to obtaining Shareholder approval, to issue up to 1,438,432 Class B Performance Rights to the Managing Director and Chief Executive Officer Mr George Bauk (or his nominee) (MD Performance Rights). The MD Performance Rights are to be issued under the Plan. A summary of the material terms of the Plan is in Schedule 2. The terms and conditions of the MD Performance Rights are set out in Schedule 3. The proposed issue of the MD Performance Rights seeks to align the efforts of Mr Bauk in seeking to achieve long-term growth of the Share price and in the generation of Shareholder value. In addition, the Board also believes that incentivising long-term performance with Performance Rights is a prudent means of conserving the Company's available cash reserves. The Board believes it is important to offer these MD Performance Rights to reward the delivery of key strategic milestones of the Company in order to continue to attract and maintain highly experienced and qualified executives in a competitive market.
Resolution 4 seeks Shareholder approval pursuant to Listing Rule 10.14 for the issue of the MD Performance Rights to Mr George Bauk (or his nominee) under the Plan. 7.2 Rationale for offer of Class B Performance Rights Beginning with the 2026 financial year and continuing thereafter, Plan awards are granted as Performance Rights which, if the service and performance conditions are met, will vest into one ordinary share of the Company. Performance Rights will expire approximately five years from the date of issuance.
For the FY2027 Performance Rights (Class B Performance Rights), the TSR performance will be assessed over a three-year period from 1 July 2026 to 30 June 2029. Class B Performance Rights will expire on 30 June 2031. Grants awarded under the Plan are determined based on a specified percentage of total fixed remuneration, “Plan entitlement”. The number of Performance Rights granted to an eligible participant in FY2027 is calculated by dividing the participant’s Plan entitlement amount by the volume-weighted average price (VWAP) of the Company’s Shares over the 20-day period to 30 June 2026.
The VWAP for the 20-day period to 30 June 2026 was A$0.4361 and this was used in the calculation of the number of FY2027 Performance Rights to be granted.
Following the grant of Class B Performance Rights in FY2027, the award will be tested and vest at 30 June 2029, contingent upon the relevant service and performance vesting conditions being achieved. To be able to vest Class B Performance Rights, recipients must be employed by the Company on the applicable vesting date. Subject to the terms and conditions in Schedule 3, the process for determining the number of Class B Performance Rights a participant is eligible to convert into Shares consists of two performance components.
The initial gateway condition requires that the Company must achieve a positive TSR over the Measurement Period for participants to qualify for up to 100% of the Plan award, and if this
Page 18
condition is not met, the maximum portion of the Plan award that can be earned is limited to 50%.
Once the initial gateway condition has been assessed, the Company's TSR performance will be evaluated relative to a peer group of listed uranium entities, and the total number of Class B Performance Rights that will vest to a participant will be determined as outlined below:
Company’s TSR Performance relative to TSR based on an index to the Peer Group’s percentile ranking over the relevant Measurement Period
Portion of Class B Performance Rights that vest Company’s TSR is less than the 50 th percentile of the TSR of the Peer Group 0% Company’s TSR is equal to the 50 th percentile of the TSR of the Peer Group 50% Company’s TSR is equal to or greater than the 75 th percentile of the TSR of the Peer Group 100% Note: Straight line vesting between the 50 th percentile and the 75 th percentile. The composition of the Peer Group is reviewed annually over the Measurement Period and may change from time to time at the discretion of the Board if one or more of the Peer Group ceases to be listed on their respective securities exchange. A positive TSR over the Measurement Period is required to enable vesting of any portion of the Class B Performance Rights. The Board is of the view that utilising a combination of Company TSR and relative TSR measured against an appropriate peer group is the most effective approach for evaluating and aligning Company performance with senior and executive remuneration under the Plan. 7.3 Listing Rule 10.14 Listing Rule 10.14 provides that a listed company must not permit any of the following persons to acquire Equity Securities under an employee incentive scheme, unless Shareholder approval is provided: (a) a director of the company (Listing Rule 10.14.1); (b) an associate of a director of the company (Listing Rule 10.14.2); or (c) a person whose relationship with the company or a person referred to in Listing Rules 10.14.1 or 10.14.2 is such that, in ASX’s opinion, the acquisition should be approved by its shareholders (Listing Rule 10.14.3). The proposed issue of the MD Performance Rights falls within Listing Rule 10.14.1 (or Listing Rule 10.14.2 if Mr Bauk elects for the MD Performance Rights to be issued to a nominee) and therefore requires the approval of Shareholders under Listing Rule 10.14.
Page 19
Approval pursuant to Listing Rule 7.1 is not required for the issue of MD Performance Rights as
approval is being obtained under Listing Rule 10.14. Accordingly, the issue of the MD
Performance Rights to George Bauk (or his nominee) will not be included in the Company’s
15% annual placement capacity in Listing Rule 7.1 or the maximum permitted number of Equity
Securities issued under Listing Rule 7.2, exception 13(b).
The effect of Shareholders passing Resolution 4 will be to allow the Company to issue the MD
Performance Rights to George Bauk (or his nominee) as part of his remuneration package.
If Resolution 4 is not passed, the Company will not be able to proceed with the issue of the MD
Performance Rights to George Bauk (or his nominee) and the Company will need to consider
other alternative commercial means to incentivise Mr Bauk, including by the payment of cash,
subject to the requirements of the Constitution, Corporations Act and Listing Rules.
7.4 Specific information required by Listing Rule 10.15
Pursuant to and in accordance with Listing Rule 10.15, the following information is provided in
relation to the proposed issue of the MD Performance Rights:
(a) The MD Performance Rights will be issued under the Plan to Mr George Bauk (or his
nominee) pursuant to Resolution 4.
(b) Mr Bauk is a related party of the Company by virtue of being a Director and falls into the
category stipulated by Listing Rule 10.14.1. In the event the MD Performance Rights
are issued to a nominee of Mr Bauk, that person will fall into the category stipulated by
Listing Rule 10.14.2.
(c) A maximum number of 1,438,432 MD Performance Rights will be issued to Mr Bauk (or
his nominee) under the Plan.
(d) The current total base annual remuneration package for Mr Bauk as at the date of this
Notice (not including his annual short-term incentive plan opportunity or the MD
Performance Rights proposed to be issued) are set out below:
Director Salary and fees (inclusive of superannuation)
George Bauk A$697,000
(e) Since the Plan was last approved by Shareholders under Listing Rule 7.2, exception
13(b) at the Company’s annual general meeting held on 21 November 2024, as at the
date of this Notice, the following Equity Securities have been issued under the Plan to
Mr Bauk (or his nominee), in each case the Equity Securities were approved by
Shareholders prior to issuance to Mr Bauk (or his nominee):
Number of
Securities
Equity Security Date of issue
1,424,830 Performance Rights 28/11/2025
Page 20
1,000,000 Service Rights 30/09/2025
(f) The MD Performance Rights will be issued on the terms and conditions in Schedule 3.
(g) A valuation of the MD Performance Rights is in Schedule 4, with a summary below.
Director Valuation of MD Performance Rights
George Bauk $274,453
(h) The Company is issuing the MD Performance Rights as a cost effective, non-cash
measure of compensating Mr Bauk. The Board considers that Performance Rights,
rather than Shares, are an appropriate form of incentive on the basis that:
(i) the MD Performance Rights are designed to retain and reward Mr Bauk for the
achievement of long-term share price growth and generation of Shareholder
value for the Company. The issue of the MD Performance Rights will therefore
further align the interests of Mr Bauk with Shareholders;
(ii) Shareholders can readily ascertain and understand the vesting conditions
which are required to be satisfied for the MD Performance Rights to vest and
the number of Shares to which they relate (i.e. each Performance Right is a
right to be issued one Share upon the satisfaction of the vesting conditions);
(iii) Mr Bauk will only obtain the value of the MD Performance Rights and be able
to exercise the MD Performance Rights into Shares upon satisfaction of the
vesting conditions; and
(iv) the issue of MD Performance Rights instead of cash is a prudent means of
rewarding and incentivising Mr Bauk whilst conserving the Company's available
cash reserves.
(i) The MD Performance Rights are intended to be issued to Mr Bauk (or his nominee) as
soon as practicable following the receipt of approval at the Meeting and in any event,
will be issued no later than three years after the date of the Meeting if the required
approval is received.
(j) The MD Performance Rights will be issued for nil cash consideration as they will be
issued as an incentive component to Mr Bauk’s remuneration packages.
(k) A summary of the material terms of the Plan is in Schedule 2.
(l) No loan will be provided to Mr Bauk in relation to the issue of the MD Performance
Rights.
(m) Details of any Securities issued under the Plan will be published in the annual report of
the Company relating to the period in which they were issued, along with a statement
that approval for the issue was obtained under Listing Rule 10.14. Any additional
persons covered by Listing Rule 10.14 who become entitled to participate in the Plan
after Resolution 4 is approved and who were not named in the Notice will not participate
Page 21
until approval is obtained under Listing Rule 10.14.
(n) A voting exclusion statement is included in the Notice.
7.5 Chapter 2E of the Corporations Act
In accordance with Chapter 2E of the Corporations Act, in order to give a financial benefit to a
related party, the Company must:
(a) obtain Shareholder approval in the manner set out in sections 217 to 227 of the
Corporations Act; and
(b) give the benefit within 15 months following such approval,
unless the giving of the financial benefit falls within an exception set out in sections 210 to 216
of the Corporations Act.
The proposed issue of the MD Performance Rights constitutes giving a financial benefit to Mr
Bauk, who is a related party of the Company by virtue of being a Director. The Board (other than
Mr Bauk who has a material personal interest in the outcome of this Resolution) has resolved
that the issue of the MD Performance Rights pursuant to Resolution 4 constitutes ‘reasonable
remuneration’ in the circumstances, and therefore falls within the scope of the exception in
section 211 of the Corporations Act.
7.6 Additional information
Resolution 4 is an ordinary resolution.
The Board (with Mr Bauk abstaining) recommends that Shareholders vote in favour of
Resolution 4.
8. Resolution 5 – Approval to increase Non-Executive Directors’
Remuneration
8.1 General
Listing Rule 10.17 provides that an entity must not increase the total aggregate amount of
directors’ fees payable to all of its non-executive directors without the approval of its
Shareholders. Article 50 of the Constitution also requires that remuneration payable to the Non-
Executive Directors will not exceed the sum determined by the Company in a general meeting
from time to time.
The maximum aggregate amount of fees payable to all of the non-executive Directors is
currently set at $550,000. Resolution 5 seeks the approval of Shareholders pursuant to Listing
Rule 10.17, and Article 50 of the Constitution to increase the total aggregate fixed sum per
annum to be paid to the non-executive Directors to $800,000 (Proposed Limit).
If Resolution 5 is passed, the Company will be able to proceed to increase the total aggregate
fixed sum per annum to be paid to the Non-Executive Directors to the Proposed Limit.
If Resolution 5 is not passed, the Company will not be able to proceed to increase the total
aggregate fixed sum per annum to be paid to the Non-Executive Directors to the Proposed Limit
and the Company may need to revise its current remuneration structure payable to its Non-
Executive Directors which may include considering the issue of Equity Securities to Non-
Page 22
Executive Directors in lieu of cash fees, subject to Shareholder approval.
8.2 Rationale for this increase
The Proposed Limit does not mean the Company must pay the entire amount approved as fees
for each year, rather the Proposed Limit is requested to:
(a) accommodate the need to attract and retain non-executive Directors whose skills and
qualifications are appropriate for the size and nature of the Company allowing for
overlapping tenures as part of the Board’s orderly succession planning;
(b) align the Company’s remuneration structure with that of comparable ASX-listed peers
in the mining sector. The proposed fee pool is considered appropriate given the scale
and complexity of the Company’s operations, while remaining consistent with market
practice; and
(c) remunerate non-executive Directors fairly due to increased time commitments and
workload, in line with expectations placed upon them by the Company and the
regulatory environment in which it operates.
The Company’s remuneration framework for Non-Executive Directors is available in the 2026
Annual Report.
8.3 Specific information required by Listing Rule 10.17
Pursuant to and in accordance with Listing Rule 10.17, the following information is provided in
relation to the proposed increase to the aggregate amount payable to Non-Executive Directors:
(a) The Company is proposing to increase the total aggregate fixed sum per annum to be
paid to the non-executive Directors by $250,000.
(b) The maximum aggregate amount per annum to be paid to all Non-Executive Directors
is $800,000 and includes any board committee fees and superannuation contributions
made by the Company for the benefit of Non-Executive Directors and any fees which a
Non-Executive Director agrees to sacrifice for other benefits. It does not include
reimbursement of genuine out of pocket expenses, genuine 'special exertion' fees paid
in accordance with the Constitution, or Equity Securities issued to a non-executive
Director under Listing Rules 10.11 or 10.14 with Shareholder approval.
(c) In the past three years, the Company has issued Equity Securities to the current Non-
Executive Directors (or their respective nominees) under Listing Rule 10.11 or 10.14 as
follows:
Non-Executive
Director
Number of
Securities
Equity Security Date of issue
David Coyne
350,000
1
Shares 30/09/2025
56,916 Service Rights 09/12/2024
Page 23
Brian Booth 70,000 1 Shares 30/09/2025 56,916 Service Rights 09/12/2024 Keith Bowes 71,429 2 Shares 03/07/2026 37,944 Service Rights 28/11/2025 Tejal Magan 57,143 2 Shares 03/07/2026 37,944 Service Rights 28/11/2025 Notes:
- David Coyne and Brian Booth subscribed for these Shares on the same terms as the unrelated participants in the share placement announced on 22 August 2025.
- Keith Bowes and Tejal Magan subscribed for these Shares on the same terms as the
unrelated participants in the share placement announced on 14 May 2026.
(d) A voting exclusion statement is included in the Notice.
8.4 Additional information
Resolution 5 is an ordinary resolution.
George Bauk, being the only Director without an interest in the outcome of this Resolution, recommends that Shareholders vote in favour of Resolution 5.
While the Company is requesting an increase in the overall fee pool, the Board has determined
that no changes will be made to the current reduced Non-Executive Director base fees until at
least the end of the 2026 calendar year.
9. Resolution 6 – Ratification of issue of Employee Performance Rights
9.1 General
On 9 and 22 September 2026, the Company issued an aggregate of 4,812,577 Class B
Performance Rights to various unrelated officers and employees of the Company or its
subsidiaries (Employee Performance Rights). The Employee Performance Rights were
issued using the Company’s placement capacity under Listing Rule 7.1.
The Employee Performance Rights were issued under the Plan. A summary of the material
terms of the Plan is in Schedule 2. The Employee Performance Rights are in the same class as
the MD Performance Rights and subject to the same vesting conditions as set out in Section
7.2 above.
Refer to Section 7.2 for a summary of the rationale for the offer of Class B Performance Rights
under the Plan.
Page 24
Resolution 6 seeks the approval of Shareholders pursuant to Listing Rule 7.4 to ratify the issue
of the Employee Performance Rights.
9.2 Listing Rules 7.1 and 7.4
Broadly speaking, and subject to a number of exceptions, Listing Rule 7.1 limits the amount of
Equity Securities that a listed company can issue without the approval of its shareholders over
any 12 month period to 15% of the fully paid ordinary shares it had on issue at the start of that
period.
Listing Rule 7.4 provides an exception to Listing Rules 7.1. It provides that where a company in
a general meeting ratifies the previous issue of securities made pursuant to Listing Rule 7.1
(and provided that the previous issue did not breach Listing Rule 7.1), those securities will be
deemed to have been made with shareholder approval for the purpose of Listing Rule 7.1. The
issue of the Employee Performance Rights did not breach Listing Rule 7.1 at the time the issue
occurred.
The effect of Shareholders passing Resolution 6 will be to allow the Company to retain the
flexibility to issue Equity Securities in the future up to the 15% additional placement capacity set
out in Listing Rule 7.1, without the requirement to obtain prior Shareholder approval.
If Resolution 6 is passed, 4,812,577 Employee Performance Rights will be excluded in
calculating the Company's 15% limit in Listing Rule 7.1, effectively increasing the number of
Equity Securities it can issue without Shareholder approval over the 12 month period following
the issue date.
If Resolution 6 is not passed, 4,812,577 Employee Performance Rights will continue to be
included in the Company's 15% limit under Listing Rule 7.1, effectively decreasing the number
of Equity Securities the Company can issue or agree to issue without obtaining prior
Shareholder approval, to the extent of 4,812,577 Equity Securities for the 12 month period
following the issue of these Employee Performance Rights.
9.3 Specific information required by Listing Rule 7.5
Pursuant to and in accordance with Listing Rule 7.5, the following information is provided in
relation to the ratification of the issue of Employee Performance Rights:
(a) The Employee Performance Rights were issued to certain officers and employees of
the Company or its subsidiaries (or their respective nominees), none of whom is a
related party or a Material Investor.
(b) A total of 4,812,577 Employee Performance Rights were issued.
(c) The Employee Performance Rights are subject to the terms and conditions in
Schedule 3.
(d) 4,732,220 Employee Performance Rights were issued on 9 September 2026 and
80,357 Employee Performance Rights were issued on 22 September 2026.
(e) The Employee Performance Rights were issued for nil cash consideration as they are
being issued as an incentive component of the respective recipients’ remuneration.
Accordingly, no funds were raised from the issue.
(f) A summary of the material terms of the Plan is in Schedule 2.
Page 25
(g) The Employee Performance Rights were not issued under an agreement.
(h) A voting exclusion statement is included in the Notice.
9.4 Additional information
Resolution 6 is an ordinary resolution.
The Board recommends that Shareholders vote in favour of Resolution 6.
10. Resolution 7 – Re-insertion of Proportional Takeover Bid Approval
Provisions
10.1 General
The Constitution contains proportional takeover bid approval provisions (PTBA Provisions)
which enable the Company to refuse to register securities acquired under a proportional
takeover bid unless a resolution is passed by Shareholders in general meeting approving the
offer. Under the Corporations Act, proportional takeover provisions expire after three years from
adoption or renewal and may then be renewed. As at the date of this Notice, the PTBA
Provisions in the current Constitution have expired.
Resolution 7 seeks the approval of Shareholders to modify the Constitution by re-inserting the
PTBA Provisions for a further three years under sections 648G(4) and 136(2) of the
Corporations Act. The proposed PTBA Provisions are identical to those previously contained in
Articles 79 and 80 of the Constitution.
The Corporations Act requires the Company to provide Shareholders with an explanation of the
PTBA Provisions as set out below.
10.2 Information required by section 648G of the Corporations Act
(a) What is a proportional takeover bid?
A proportional off-market takeover bid (PT Bid) is a takeover offer sent to all
Shareholders but only for a specified portion of each Shareholder’s Securities.
Accordingly, if a Shareholder accepts in full the offer under a PT Bid, it will dispose of
the specified portion of its securities in the Company and retain the balance of the
Securities.
(b) Effect of renewal
If renewed and a PT Bid is made to Shareholders of the Company, the Board is required
to convene a meeting of Shareholders to vote on a resolution to approve the
proportional takeover. That meeting must be held at least 14 days before the day before
the last day of the bid period and during which the offers under the PT Bid remain open
or a later day allowed by ASIC (Deadline Date).
The resolution is taken to have been passed if a majority of securities voted at the
meeting, excluding the securities of the bidder and its associates, vote in favour of the
resolution. If no resolution is voted on by the Deadline Date, the resolution is deemed
to have been passed.
Page 26
Where the resolution approving the PT Bid is passed or deemed to have been passed,
transfers of securities resulting from accepting the PT Bid are registered provided they
otherwise comply with the Corporations Act, the Listing Rules, the ASX Operating Rules
and the Company's Constitution. If the resolution is rejected, then under the
Corporations Act the PT Bid is deemed to be withdrawn.
The Directors consider that Shareholders should have the opportunity to re-insert the
PTBA Provisions. Without the PTBA Provisions applying, a PT Bid for the Company
may enable effective control of the Company to be acquired without Shareholders
having the opportunity to dispose of all of their securities to the bidder. Shareholders
could be at risk of passing control to the bidder without payment of an adequate control
premium for all their securities whilst leaving themselves as part of a minority interest in
the Company. Without the PTBA Provisions, if there was a PT Bid and Shareholders
considered that control of the Company was likely to pass, Shareholders would be
placed under pressure to accept the PT Bid even if they did not want control of the
Company to pass to the bidder. Re-inserting the PTBA Provisions will make this
situation less likely by permitting Shareholders to decide whether a PT Bid should be
permitted to proceed.
(c) No knowledge of present acquisition proposals
As at the date of this Notice, no Director is aware of a proposal by any person to acquire
or increase the extent of a substantial interest in the Company.
(d) Advantages and disadvantages since last renewed
As there have been no takeover bids made for any of the Shares in the Company since
the PTBA Provisions were adopted, there has been no application of the provisions. It
may be argued that the potential advantages and disadvantages described below have
also applied for the period since adoption of the PTBA Provisions.
(e) Potential advantages and disadvantages
The renewal of the PTBA Provisions will enable the Directors to formally ascertain the
views of Shareholders about a PT Bid. Without these provisions, the Directors are
dependent upon their perception of the interests and views of Shareholders. Other than
this advantage, the Directors consider that re-insertion of the PTBA Provisions has no
potential advantages or potential disadvantages for them, as they remain free to make
a recommendation on whether a PT Bid should be accepted.
The Directors consider that re-inserting the PTBA Provisions benefits all Shareholders
in that they will have an opportunity to consider a PT Bid and then attend or be
represented by proxy at a meeting of Shareholders called specifically to vote on the
proposal. Accordingly, Shareholders are able to prevent a PT Bid proceeding if there is
sufficient support for the proposition that a substantial interest (and potentially control)
of the Company should not be permitted to pass under the PT Bid. Furthermore,
knowing the view of Shareholders assists each individual Shareholder to assess the
likely outcome of the PT Bid and whether to accept or reject that bid.
As to the possible disadvantages to Shareholders re-inserting the PTBA Provisions,
potentially, the proposal makes a PT Bid more difficult and PT Bids will therefore be
discouraged. This may reduce the opportunities which Shareholders may have to sell
all or some of their securities at a premium to persons seeking an increased holding or
control of the Company and may reduce any takeover speculation element in the
Page 27
Company's Share price. The PTBA Provisions may also be considered an additional
restriction on the ability of individual Shareholders to deal freely on their Securities.
The Directors consider that there are no other advantages or disadvantages for
Directors or Shareholders which arose during the period during which the PTBA
Provisions were in effect, other than those discussed in this Section. On balance, the
Directors consider that the possible advantages outweigh the possible disadvantages
so that the re-insertion of the PTBA Provisions is in the interest of Shareholders.
10.3 Additional information
Resolution 7 is a special resolution and therefore requires approval of 75% of the votes cast by
Shareholders present and eligible to vote (in person, by proxy, by attorney or, in the case of a
corporate Shareholder, by a corporate representative).
The Board recommends that Shareholders vote in favour of Resolution 7.
Page 28
Schedule 1 Definitions
In the Notice, words importing the singular include the plural and vice versa.
10% Placement Facility has the meaning in Section 6.1.
10% Placement Period has the meaning in Section 6.2(f).
$ or A$ means Australian Dollars.
Annual Report
means the Directors’ Report, the Financial Report, and Auditor’s Report,
in respect to the year ended 30 June 2026.
Article means an article in the Constitution.
ASICmeans the Australian Securities and Investments Commission.
ASX
means the ASX Limited (ACN 008 624 691) and, where the context
permits, the Australian Securities Exchange operated by ASX Limited.
Auditor's Report means the auditor’s report contained in the Annual Report.
AWST
means Australian Western Standard Time, being the time in Perth,
Western Australia.
Board means the board of Directors.
Business Day
means a day other than a Saturday, Sunday, bank holiday or public
holiday in Perth, Western Australia.
Chair
means the person appointed to chair the Meeting of the Company
convened by the Notice.
Class B Performance
Right
means a right, subject to certain terms and conditions, to acquire a Share
on the satisfaction (or waiver) of certain performance conditions that are
summarised in Schedule 3.
Closely Related Party means:
(a) a spouse or child of the member; or
(b) has the meaning given in section 9 of the Corporations Act.
Company means Peninsula Energy Limited (ACN 062 409 303).
Constitution means the constitution of the Company, as amended.
Corporations Act means the Corporations Act 2001 (Cth), as amended.
Deadline Date has the meaning given in Section 10.2(b).
Director means a director of the Company.
Directors' Report
means the annual directors' report prepared under Chapter 2M of the
Corporations Act for the Company and its controlled entities.
Page 29
Employee Performance
Rights
has the meaning given in Section 9.1.
Equity Security has the same meaning as in the Listing Rules.
Explanatory
Memorandum
means the explanatory memorandum which forms part of the Notice.
Financial Report means the financial report contained in the Annual Report.
Key Management
Personnel
has the same meaning as in the accounting standards issued by the
Australian Accounting Standards Board and means those persons having
authority and responsibility for planning, directing and controlling the
activities of the Company, or if the Company is part of a consolidated
entity, of the consolidated entity, directly or indirectly, including any
Director (whether executive or otherwise) of the Company, or if the
Company is part of a consolidated entity, of an entity within the
consolidated group.
Listing Rules means the listing rules of ASX.
MD Performance Rightshas the meaning given in Section 7.1.
Measurement Periodmeans the period beginning 1 July 2026 and ending on 30 June 2029.
Meeting has the meaning given in the introductory paragraph of the Notice.
Minimum Issue Price has the meaning given in Section 6.2(e).
Non-Executive Directors
mean, collectively, David Coyne, Brian Booth, Keith Bowes and Tejal
Magan.
Notice means this notice of annual general meeting.
Option means a right, subject to certain terms and conditions, to acquire a Share.
Peer Groupmeans, collectively:
(a) Boss Energy Limited ASX:BOE
(b) Bannerman Energy Limited ASX:BMN
(c) Berkeley Energia Limited ASX:BKY
(d) Deep Yellow Limited ASX:DYL
(e) Lotus Resources Limited ASX:LOT
(f) Paladin Energy Limited ASX:PDN
(g) Energy Fuels AME:UUUU
(h) enCore Energy TSXV:EU
(i) Ur Energy Limited TSX:EU
(j) Denison Mines TSX:DML
(k) UEC AME:UEC
Page 30
(l) Alligator Energy ASX:AGE
(m) Aura Energy ASX:AEE
Performance Right
means a right, subject to certain terms and conditions, to acquire a Share
on the satisfaction (or waiver) of certain performance conditions.
Plan means the ‘Peninsula Energy Limited Long-Term Incentive Plan’.
Proposed Limit has the meaning given in Section 8.1.
Proxy Form means the proxy form provided with the Notice.
PT Bid has the meaning given in Section 10.2(a).
PTBA Provisions has the meaning given in Section 10.1.
Remuneration Report means the remuneration report contained in the Annual Report.
Resolution means a resolution referred to in the Notice.
Schedule means a schedule to the Notice.
Section means a section of the Explanatory Memorandum.
Securities
means any Equity Securities of the Company (including Shares, Options
and/or Performance Rights).
Share means a fully paid ordinary share in the capital of the Company.
Shareholder means the holder of a Share.
Strike has the meaning in Section 4.1.
Trading Day has the same meaning as in the Listing Rules.
TSR
means the measure of return to shareholders as defined by the
percentage change in share price over the Measurement Period. TSR is
calculated by reference to:
(a) the VWAP of the shares as traded on the ASX during the 20
Trading Days up to 30 June 2026, (being $0.4361 in respect to
the Company); compared to
(b) the 20 Trading Days up to and including the last trading day of
the Measurement Period.
Variable A has the meaning in Section 6.3(d).
VWAP
has the meaning given to the term ‘volume weighted average market
price’ in the Listing Rules.
Page 31
Schedule 2 Summary of material terms of the Plan
A summary of the material terms of the Plan is set out below.
- GENERAL
1.1 The Board may invite eligible employees (including executive directors) of the Company and its related bodies corporate and other persons determined by the Board to participate in a grant of Awards upon the terms set out in the Plan upon such additional terms, including vesting conditions (if any) as the Board determines (Invitations).
1.2 The Invitations will be in such form and content and with such terms and conditions as the Board determines, including:
(a) the number of Awards being offered or the method by which the number will be calculated;
(b) whether the Awards are in the form of options, performance rights, Restricted Share Units (RSUs) or share awards or a combination;
(c) the date the Company or the Trustee (defined below) allocates the entitlements to the participant;
(d) the period or periods during which Awards may vest;
(e) any applicable vesting conditions;
(f) the exercise price for an Award granted as an option or the method by which that exercise price will be calculated;
(g) the acquisition price (if any) for an Award granted as a share award or the method by which that acquisition price will be calculated;
(h) the period or periods in which an Award granted as an option may be exercised;
(i) the dates or circumstances in which Awards may lapse;
(j) the amount (if any) that will be payable by the participant upon the grant of an Award;
(k) whether the Awards carry an entitlement to a dividend equivalent payment;
(l) whether cashless exercise is permitted for an Award granted as an option;
(m) the circumstances (if any) in which Shares allocated to the participant may be forfeited;
(n) any restrictions (including the period of restriction) on dealing in a Share allocated to the participant upon vesting or exercise of an Award;
(o) any other terms or conditions to be attached to either or both the Award and Shares allocated to the participant; and (p) in the case of a share award, whether the Shares to be allocated are to be acquired, delivered and/or held by the trustee of the Trust (defined below).
1.3 The operation of the Plan may involve a trust established to acquire Shares which will be held on behalf of participants or transferred to participants for the purposes of the Plan (Trust). The
Page 32
trustee of the Trust (Trustee) will act in accordance with instructions issued by the Board and
subject to the terms and conditions of the Trust Deed.
1.4 Where the Trustee holds Shares for the benefit of a participant in accordance with an Invitation,
the Company will issue the participant with one RSU for each Share held by the Trustee. The
Company will direct the Trustee to:
(a) pay to participants any dividends attributable to the underlying Shares; and
(b) accept instructions from participants to vote the underlying Shares in a particular
manner at a general meeting of the Company,
in accordance with the Trust Deed.
1.5 RSUs will be cancelled by the Company when the underlying Shares vest in a participant and
are transferred to the participant by the Trustee, or when the Trustee sells (or otherwise deals
with) Shares and pays the proceeds of such sale or dealing to the participant, or where a Share
which relates to an RSU is forfeited under the Plan.
1.6 Awards cannot be transferred without the prior consent of the Board (except by force of law
upon death or bankruptcy) and where a participant purports to deal with an Award in breach of
the Plan, the Award will immediately lapse unless the Board determines otherwise.
2. OPTIONS AND PERFORMANCE RIGHTS
2.1 Options and/or performance rights (as the case may be) will only vest and be exercisable if the
applicable vesting conditions have been satisfied, waived by the Board or are deemed to have
been satisfied under the Plan.
2.2 Each vested option and each vested performance right entitles the participant to subscribe for,
or be transferred, one Share, in the case of an Option, on payment of the exercise price (if any).
2.3 A participant who holds options and/or performance rights under the Plan is not entitled to:
(a) notice of, or to vote at or attend, a meeting of Shareholders unless and until the options
and/or performance rights are exercised and the participant holds Shares; or
(b) receive any dividends declared by the Company in respect of such options and/or
performance rights.
2.4 Where the terms of an Award permit, the Board may exercise its discretion to make a cash
payment to a participant in lieu of an allotment, issuance or transfer of Shares equivalent to the
value of the performance rights that have vested or the options that have been exercised. The
amount of cash payment will be calculated by multiplying the number of performance rights that
have vested or the number of options that have been exercised (as applicable) by the volume
weighted average price of Shares over the five Business Days commencing on the date on
which the Share would otherwise have been allotted, issued or transferred to a participant, less
in the case of options, any exercise price of those options which has not been paid by the
participant to the Company.
2.5 The Board may also determine at the time an Invitation is made that a participant who becomes
entitled to receive an allotment, issuance or transfer of Shares (or a cash payment in lieu)
following vesting of a performance right or exercise of an option will also be entitled to receive
a dividend equivalent payment. The dividend equivalent payment will be approximately equal to
the number of dividends that would have been payable to a participant if he or she had been
the registered holder of the Shares that have vested from the first day of the financial year in
Page 33
which the Awards are granted (excluding any dividends actually paid in respect of those
Shares). The dividend equivalent payment may be satisfied by the issuance of Shares or
payment in cash.
2.6 If the terms of an option specify that, amongst other things, cashless exercise is permitted, and
the market value of the Shares on the date of exercise of the options is greater than the exercise
price of the options, the Company must allot, issue or transfer that number of Shares in
accordance with a formula that takes into account the exercise of the options whereby the
number of Shares the participant is entitled to is reduced by the value of the exercise price
which would have otherwise been payable in cash by the participant.
3. SHARE AWARDS
3.1 The Board may at its discretion make an offer to eligible employees to acquire share awards
and the Board will determine the acquisition price (if any) for each share award and may be nil.
3.2 Where share awards are subject to vesting conditions, the participant's share awards are
subject to the restrictions set out in paragraph 1.6 above unless and until the applicable vesting
conditions have been satisfied, waived by the Board or are deemed to have been satisfied.
3.3 Once the vesting conditions have been satisfied, waived by the Board or are deemed to have
been satisfied, the share awards will no longer be subject to the restrictions set out in paragraph
1.6 above and may be transferred or sold by the participant subject to compliance with any
applicable laws and the terms of the Plan.
4. ADJUSTMENTS TO AWARDS
4.1 Subject to the terms and conditions of the Invitation, all of the unvested entitlements of a
participant are to vest on such date as the Board determines that the entitlements of a participant
have vested or on the occurrence of any of the accelerated vesting events which are set out in
the Plan.
5. LAPSE OF AWARDS
5.1 An unvested Award will lapse upon the earliest to occur of:
(a) the dates or circumstances in which Awards may lapse as specified in the Invitation;
(b) failing to meet the vesting conditions applicable to the Award within the specified period;
or
(c) where in the opinion of the Board, a participant has acted fraudulently or dishonestly.
There are certain prescribed circumstances in which an unvested Award will lapse, for example,
if the Award is dealt with by the participant in breach of the PLAN.
6. RIGHTS ATTACHING TO SHARES AND SHARE AWARDS
6.1 Any share awards or Shares allotted, issued or transferred by the Company to a participant
under the Plan will rank equally with all existing Shares on and from the date of allotment, issue
or transfer, including in respect of all rights and bonus issues, dividends declared and voting
rights.
6.2 If Shares of the same class as those issued on the vesting or exercise of an Award are quoted
on ASX, the Company will apply for quotation of Shares allotted, issued or transferred under
the Plan (if not already quoted on ASX) within the period required by ASX.
Page 34
- DISPOSAL RESTRICTIONS
7.1 When making an invitation the Board may determine that Shares issued under an Award may not be disposed of or dealt with until the end of the period determined by the Board when making the Invitation, or where the Participant is no longer employed by the participant's employer, the Company or any related body corporate.
7.2 The disposal restrictions imposed under the Plan are subject to any disposal required by law. - FORFEITURE
8.1 While Awards held by a Participant, or by the Trustee on behalf of a Participant, are subject to vesting conditions which have not yet been satisfied or waived, or subject to a disposal restriction, if:
(a) those Awards have not become vested by the end of any applicable vesting period or the Board determines that the vesting conditions are incapable of being satisfied by the end of the vesting period; or
(b) 30 days after the participant has ceased to be employed by a group member and the Board has not made a determination that entitlements have vested,
the Board may declare that the participant shall forfeit any right or interest in the Awards or other entitlements of the participant under the Plan and, where applicable, the Board shall notify the Trustee accordingly.
8.2 The Board, in its discretion, may determine that forfeited Share Awards are to be sold, transferred or otherwise disposed of or allocated to other existing or new participants and may, where applicable, give the Trustee such directions as it determines to give effect thereto including how any proceeds from the sale of forfeited Share Awards are to be applied.
8.3 A participant will have no rights in respect of the proceeds from a sale or other disposal of any forfeited Share Awards and releases and shall hold harmless the Trustee (where applicable), the Company, each director, each related body corporate and the Board from and indemnify the Trustee (where applicable), the Company, each director, each related body corporate and the Board against any claim or liability in respect thereof and from any claim that might otherwise arise from the forfeiture of a share award or other entitlement of a participant under the Plan. - TAKEOVERS AND CHANGE OF CONTROL
9.1 In the event of a takeover event or immediately prior to a change of control, the Board must consider whether, and may determine that, all or a specified number of a participant's unvested Awards vest and in the case of options, may be exercised, having regard to all the relevant circumstances, including whether performance is in line with the vesting condition over the period from the date of grant of the Award to the date of the relevant takeover event.
9.2 If the Board determines that only some of a participant's unvested Awards will vest, or the Board does not make a determination, all unvested Awards will lapse, unless the Board determines otherwise. - RESTRICTIONS ON PLAN
10.1 Subject to the terms of the Plan, the Company may not issue any Shares under an Invitation if, at the time of making the Invitation, the Company has reasonable grounds to believe that the number of Shares that have or may be issued in any of the following circumstances would exceed 5% of the number of Shares on issue:
Page 35
(a) the number of Shares that may be issued under the Invitation; and
(b) (b) the number of Shares issued or that may be issued as a result of offers made at any
time during the previous three years pursuant to an employee or share option scheme
extended to either or both employees and directors of the Company and its related
bodies.
11. PARTICIPANTS BASED OVERSEAS
11.1 When an Award is granted under the Plan to a person who is not a resident of Australia, the
provisions of the Plan apply subject to such alterations or additions as the Board determines
having regard to any applicable or relevant laws, matters of convenience and desirability and
similar factors which may have application to the participant or to the Company in relation to the
Award.
11.2 If a participant is transferred to work for a related body corporate outside Australia and, as a
result of that transfer, the participant would:
(a) suffer a tax disadvantage in relation to their Awards which is demonstrated to the
satisfaction of the Board;
(b) become subject to restrictions on their ability to deal with the Awards, or to hold or deal
in the Shares or the proceeds of the Shares acquired on vesting or exercise, because
of the laws (including securities or exchange control laws) of the country to which he or
she is being transferred,
then, if the participant continues to hold an office or employment with a related body corporate,
the Board may decide that the Awards will vest or in the case of options may be exercised on a
date the Board determines before or after the transfer takes effect. The Awards will vest to, or
on behalf of, the participant to the extent permitted by the Board and will not lapse as to the
balance. The options may be exercised to the extent permitted by the Board.
Page 36
Schedule 3 Terms and conditions of the Performance Rights
The following provides the terms and conditions applying to the MD Performance Rights and Employee
Performance Rights (in this Schedule, referred to as ‘Performance Rights’) under the Plan.
-
(Entitlement): Subject to the terms and conditions set out below and the Plan, each Performance Right, once vested, entitles the holder, on conversion, to the issue of one (1) fully paid ordinary share in the capital of the Company (Share).
-
(Vesting Conditions): The Performance Rights are subject to the following vesting conditions (Vesting Conditions).
(a) positive TSR over the Measurement Period; and (b) number of Performance Rights that vest shall be determined by the relative TSR performance against the Peer Group (as detailed in the table below).
Company’s TSR Performance relative to TSR based on an index to the Peer Group’s percentile ranking over the relevant Measurement Period 1 Portion of Class B Performance Rights that vest Company’s TSR is less than the 50 th percentile of the TSR of the Peer Group 0% Company’s TSR is equal to the 50 th percentile of the TSR of the Peer Group 50% Company’s TSR is equal to or greater than the 75 th percentile of the TSR of the Peer Group 100% Note: Straight line vesting between the 50 th percentile and the 75 th percentile A positive Company TSR over the Measurement Period is required to enable vesting of any portion of the Performance Rights. Subject to a positive Company TSR over the Measurement Period, all Performance Rights are available to vest.
Defined terms in this paragraph 2 have the same meaning as given to the terms in
Schedule 1.
3. (Consideration): The Performance Rights will be granted for nil cash consideration.
4. (Exercise Price): The exercise price of each vested Performance Right is nil.
5. (Expiry Date): The Performance Rights will expire and lapse on the first to occur of the following:
(a) 5:00pm (AWST) on 30 June 2031;
(b) the Performance Rights not satisfying the Vesting Conditions on the Measurement Date
in accordance with paragraph 2; and
Page 37
(c) the Performance Right lapsing and being forfeited under the Plan or these terms and
conditions,
(Expiry Date). For the avoidance of doubt, any vested but unexercised Performance Rights will
automatically lapse on the Expiry Date.
6. (Conversion): Upon vesting, each Performance Right will, at the participant’s election, convert
into one (1) Share. The Participant may apply to exercise vested Performance Rights at any
time during the specified exercise periods by the Company prior to the Expiry Date by filling out
a notice of exercise in a form provided by the Company and returning it to the Company
Secretary (Notice of Exercise).
7. (Timing of notice of exercise (conversion of vested Performance Rights)): Once a holder’s
Performance Rights have vested, the holder will have three (3) annual time windows in which
to provide a notice of exercise to the Company. The three (3) notice periods are as follows:
(a) The last two weeks of calendar months March, June and November of each year.
The Board reserves the right to increase the duration, and number, of notice periods in any year.
8. (Timing of Issue of Shares and Quotation of Shares on Exercise): As soon as practical after
a valid Notice of Exercise by a holder has been received by the Company, the Company will:
(a) issue, allocate or cause to be transferred to the holder the number of Shares to which
the holder is entitled (in the Board’s discretion);
(b) if required, issue a substitute certificate for any remaining unexercised Performance
Rights held by the holder;
(c) if required, and subject to paragraph 10, give ASX a notice that complies with section
708A(5)(e) of the Corporations Act; and
(d) do all such acts, matters and things to obtain the grant of quotation of the Shares by the
ASX in accordance with the Listing Rules and subject to the expiry of any restriction
period that applies to Shares under the Corporations Act or Listing Rules.
9. (Restrictions on Transfer of Shares): If the Company is required but is unable to give the ASX
a notice that complies with section 708A(5)(e) of the Corporations Act, Shares issued on
conversion of the Performance Rights may not be traded until 12 months after their issue unless
the Company, at its sole discretion, elects to issue a prospectus pursuant to section 708A(11)
of the Corporations Act.
10. (Shares Issued on Exercise): All Shares issued upon exercise of Performance Rights will upon
issue rank pari passu in all respects with the then Shares of the Company.
11. (Transfer): The Performance Rights are not transferable unless they have vested and only with
the prior written approval of the Board, and subject to compliance with the Listing Rules and
Corporations Act.
12. (Quotation): No application for quotation of the Performance Rights will be made by the
Company.
Page 38
- (Voting and Dividend Rights): The Performance Rights do not confer on the holder an entitlement to vote at general meetings of the Company or to receive dividends.
- (Participation in Entitlements and Bonus Issues): Subject always to the rights under paragraphs 15 and 16, holders of Performance Rights will not be entitled to participate in new issues of capital offered to holders of Shares such as bonus issues and entitlement issues.
- (Adjustment for Bonus Issues): If securities are issued pro-rata to Shareholders generally by way of bonus issue (other than an issue in lieu of dividends by way of dividend reinvestment), the number of Performance Rights to which the holder is entitled will be increased by that number of securities which the holder would have been entitled if the Performance Rights held by the holder were exercised immediately prior to the record date of the bonus issue, and in any event in a manner consistent with the ASX Listing Rules at the time of the bonus issue.
- (Reorganisation of Capital): In the event that the issued capital of the Company is reorganised (including consolidation, subdivision, reduction or return), all the holder's rights as a holder of Performance Rights will be changed to the extent necessary to comply with the Listing Rules at the time of reorganisation provided that, subject to compliance with the Listing Rules, following such reorganisation the holder's economic and other rights are not diminished or terminated.
- (Rights on winding up): The Performance Rights carry no right to participate in the surplus profits or assets of the Company upon a winding up of the Company.
- (Leaver): Where the holder of the Performance Rights (or the relevant Participant (as defined in the Plan) in the case of a permitted nominee holder of the Performance Rights) is no longer employed, or their office or engagement is discontinued with the Company: (a) as a result of an Accelerated Vesting Event (as defined in the Plan), unvested Performance Rights will be exercisable from the date that an Accelerated Vesting Event occurred; and (b) in all other circumstances, any unvested or unexercised Performance Rights will automatically lapse and be forfeited by the holder, unless the Board otherwise determines in its discretion in accordance with the Plan.
- (Change of Control Event): If a Change of Control Event (as defined in the Plan) occurs, then: (a) any unvested Performance Rights will automatically vest; and (b) to the extent Performance Rights have not been converted into Shares following satisfaction of Vesting conditions, Performance Rights will automatically convert to that number of Shares.
- (Clawback): In addition to the rights available to the Company under Rule 8(b) of the Plan, if an event (or events) described in Rule 8(a)(1) of the Plan has occurred, the Board may also, by written notice to a Participant (as defined in the Plan): (a) require the Participant (as defined in the Plan) pay to the Company the after-tax value of the relevant Shares issued on exercise of vested Performance Rights, with such payment to be made within 30 days of receipt of such notice; and/or (b) adjust fixed remuneration, incentives or participation in the Plan of a relevant Performance Right holder, or previous relevant Performance Right holder in the case of exercise of vested Performance Rights, in the current year or any future year to take into account the after-tax value of the relevant Shares issued upon exercise of vested Performance Rights.
Page 39
Schedule 4 Valuation of the MD Performance Rights
The MD Performance Rights to be issued to Mr George Bauk pursuant to Resolution 4 have been
valued independently by RSM Australia using a binomial option valuation model developed by Hoadley
Trading & Investment Tools and, based on the assumptions set out below,
were ascribed the following
value:
Assumptions
Valuation date 25 September 2026 Market price of Shares $0.255 Exercise price Nil Expiry date 30 June 2031 Risk free interest rate 4.97% Expected Future Volatility (discount) 90%
Average value per MD Performance Right $0.1908 Total Number of MD Performance Rights 1,438,432 Total Value of MD Performance Rights $274,453
- Risk free interest rate based on the yield of 5 year government bonds as per the RBA using the closing rate at the valuation date.
- Expected Future Volatility based on the historical volatility of the Company, we have assessed the expected Future Volatility to be 90%.
- Market price was calculated as the closing price of the Shares on the valuation date.
Note: The valuation noted above is not necessarily the market price that the MD Performance Rights could be traded at and is not automatically the market price for taxation purposes.
Proxy Voting Form If you are attending the Meeting in person, please bring this with you for Securityholder registration. Peninsula Energy Limited | ABN 67 062 409 303
Your proxy voting instruction must be received by 9:00am (AWST) on Saturday, 21 November 2026, being not later than 48 hours before the commencement of the Meeting. Any Proxy Voting instructions received after that time will not be valid for the scheduled Meeting. SUBMIT YOUR PROXY Complete the form overleaf in accordance with the instructions set out below. YOUR NAME AND ADDRESS The name and address shown above is as it appears on the Company’s share register. If this information is incorrect, and you have an Issuer Sponsored holding, you can update your address through the investor portal: https://investor.automic.com.au/#/home Shareholders sponsored by a broker should advise their broker of any changes. STEP 1 - APPOINT A PROXY If you wish to appoint someone other than the Chair of the Meeting as your proxy, please write the name of that Individual or body corporate. A proxy need not be a Shareholder of the Company. Otherwise if you leave this box blank, the Chair of the Meeting will be appointed as your proxy by default. DEFAULT TO THE CHAIR OF THE MEETING Any directed proxies that are not voted on a poll at the Meeting will default to the Chair of the Meeting, who is required to vote these proxies as directed. Any undirected proxies that default to the Chair of the Meeting will be voted according to the instructions set out in this Proxy Voting Form, including where the Resolutions are connected directly or indirectly with the remuneration of Key Management Personnel. STEP 2 - VOTES ON ITEMS OF BUSINESS You may direct your proxy how to vote by marking one of the boxes opposite each item of business. All your shares will be voted in accordance with such a direction unless you indicate only a portion of voting rights are to be voted on any item by inserting the percentage or number of shares you wish to vote in the appropriate box or boxes. If you do not mark any of the boxes on the items of business, your proxy may vote as he or she chooses. If you mark more than one box on an item your vote on that item will be invalid. APPOINTMENT OF SECOND PROXY You may appoint up to two proxies. If you appoint two proxies, you should complete two separate Proxy Voting Forms and specify the percentage or number each proxy may exercise. If you do not specify a percentage or number, each proxy may exercise half the votes. You must return both Proxy Voting Forms together. If you require an additional Proxy Voting Form, contact Automic Registry Services. SIGNING INSTRUCTIONS Individual: Where the holding is in one name, the Shareholder must sign. Joint holding: Where the holding is in more than one name, all Shareholders should sign. Power of attorney: If you have not already lodged the power of attorney with the registry, please attach a certified photocopy of the power of attorney to this Proxy Voting Form when you return it. Companies: To be signed in accordance with your Constitution. Please sign in the appropriate box which indicates the office held by you. Email Address: Please provide your email address in the space provided. By providing your email address, you elect to receive all communications despatched by the Company electronically (where legally permissible) such as a Notice of Meeting, Proxy Voting Form and Annual Report via email. CORPORATE REPRESENTATIVES If a representative of the corporation is to attend the Meeting the appropriate ‘Appointment of Corporate Representative’ should be produced prior to admission. A form may be obtained from the Company’s share registry online at https://automicgroup.com.au. Lodging your Proxy Voting Form: Online Use your computer or smartphone to appoint a proxy at https://portal.automic.com.au/investor/home or scan the QR code below using your smartphone Login & Click on ‘Meetings’. Use the Holder Number as shown at the top of this Proxy Voting Form. BY MAIL: Automic GPO Box 5193 Sydney NSW 2001 IN PERSON: Automic Level 5, 126 Phillip Street Sydney NSW 2000 BY EMAIL: [email protected] BY FACSIMILE: +61 2 8583 3040 All enquiries to Automic: WEBSITE: https://automicgroup.com.au PHONE: 1300 288 664 (Within Australia) +61 2 9698 5414 (Overseas)
STEP 1 - How to vote APPOINT A PROXY: I/We being a Shareholder entitled to attend and vote at the Annual General Meeting of Peninsula Energy Limited, to be held at 9:00am (AWST) on Monday, 23 November 2026 at BDO Jarrah Room Level 9 Mia Yellagonga Tower 2 5 Spring Street PERTH WA 6000 hereby: Appoint the Chair of the Meeting (Chair) to vote in accordance with the following directions (or if no directions have been given, and subject to the relevant laws, as the Chair sees fit) at this meeting and at any adjournment thereof. Please note: If you are not appointing the Chair of the Meeting as your proxy, please write in the box provided below the name of the person or body corporate you are appointing as your proxy. If the person so named is absent from the meeting, or if no person is named, the Chair will act on your behalf.
The Chair intends to vote undirected proxies in favour of all Resolutions in which the Chair is entitled to vote. Unless indicated otherwise by marking the “for”, “against” or “abstain” box you will be authorising the Chair to vote in accordance with the Chair’s voting intention. AUTHORITY FOR CHAIR TO VOTE UNDIRECTED PROXIES ON REMUNERATION RELATED RESOLUTIONS Where I/we have appointed the Chair as my/our proxy (or where the Chair becomes my/our proxy by default), I/we expressly authorise the Chair to exercise my/our proxy on Resolutions 1, 4, 5 and 6 (except where I/we have indicated a different voting intention below) even though Resolutions 1, 4, 5 and 6 are connected directly or indirectly with the remuneration of a member of the Key Management Personnel, which includes the Chair. STEP 2 - Your voting direction ResolutionsForAgainstAbstain 1Remuneration Report
2Re-Election of Director – David Coyne
3Approval of 10% Placement Facility
4Approval to issue MD Performance Rights
5Approval to increase Non-Executive Directors’ Remuneration
6Ratification of issue of Employee Performance Rights
7Re-insertion of Proportional Takeover Bid Approval Provisions
Please note: If you mark the abstain box for a particular Resolution, you are directing your proxy not to vote on that Resolution and your votes will not be counted in computing the required majority on a poll. STEP 3 – Signatures and contact details Individual or Securityholder 1Securityholder 2Securityholder 3
Sole Director and Sole Company SecretaryDirectorDirector / Company Secretary
ASX ANNOUNCEMENT (ASX: PEN)
22 October 2026
Dear Shareholder
PENINSULA ENERGY LIMITED – UPCOMING ANNUAL GENERAL MEETING OF SHAREHOLDERS
Peninsula Energy Limited (Company) will hold its Annual General Meeting of shareholders at BDO, Jarrah Room, Level 9, Mia Yellagonga Tower 2, 5 Spring Street, PERTH WA 6000 at 9.00am (WST) on Monday, 23 November 2026. (Meeting).
In accordance with modifications to the Corporations Act 2001 (Cth), the Company is not sending hard copies of the Notice of Meeting to Shareholders (NOM). The NOM can be viewed and downloaded from the following website link:
http://www.pel.net.au/announcements/
To vote by proxy, please complete and sign the proxy form enclosed with this letter as soon as possible and either deliver the proxy form by post, by facsimile or by email in accordance with the instructions on the proxy form. You may also submit your proxy form online in accordance with instructions on the proxy form.
Your proxy must be lodged no later than 9:00am (AWST) on Saturday, 21 November 2026.
If the above arrangements with respect to the Meeting change, shareholders will be updated via the ASX Market Announcements Platform and also via the Company’s website at http://www.pel.net.au/.
The NOM and the accompanying Explanatory Memorandum should be read in its entirety. If a shareholder is in doubt as to how to vote, that shareholder should seek advice from an accountant, solicitor or other professional advisor prior to voting.
Yours faithfully
Jonathan Whyte Company Secretary
– ENDS –
This release has been approved by the Managing Director.
ASX ANNOUNCEMENT (ASX: PEN)
13 October 2026 Retirement of Non-Executive Director Peninsula Energy Limited (“Peninsula” or the “Company”) (ASX: PEN, OTCQB: PENMF) announces that Non- Executive Director Mr Brian Booth has informed the Company that he wishes to retire from the Board at the next Annual General Meeting scheduled for 23 November 2026 and will not seek re-election at the meeting.
Peninsula Energy Non-Executive Chair, David Coyne, said: “On behalf of the Board, we thank Brian for his counsel, support and dedication to Peninsula over the past 4 years. We wish Brian all the very best as he scales back his business and company director commitments and transitions to retirement which will enable him to spend more time with his family.” – ENDS – This release has been approved by Peninsula’s Board of Directors.
Annual Report
2026
Driving progress towards
a greener tomorrow
Ramping up production for a clean energy future
Contents
Chair Letter 2
Corporate Governance Statement 6
Directors’ Report 10
Review of Operations 12
Remuneration Report - Audited 25
Auditor’s Independence Declaration 36
Financial Report 37
Consolidated Statement of Profit or 38
Loss and Other Comprehensive Income
Consolidated Statement of Financial Position 39
Consolidated Statement of Changes in Equity 40
Consolidated Statement of Cash Flows 41
Notes to the Consolidated Financial Statements 42
Consolidated Entity Disclosure Statement 78
Directors’ Declaration 79
Independent Auditor’s Report 80
ASX Additional Information 84
Corporate Directory 88
ABN 67 062 409 303
Peninsula Energy Limited | Annual Report 20261
Chair Letter Peninsula Energy Limited | Annual Report 20262
Dear fellow Shareholders, This is my second letter to you as Chair of the Peninsula Energy Board, following my appointment to that role on a permanent basis in August 2025. Like the 2025 financial year, FY2026 has presented a number of challenges for the Company as we finalised construction of the expanded functionality and capacity of the Central Processing Plant at the Lance Project and continued ongoing wellfield development, operations and maintenance. As I look back on the past 12 months, I feel it has been a period of significant learning for Peninsula as a whole, and especially for our site leadership and operating teams. Importantly, FY2026 also marked several significant milestones for the Company. We completed the substantial capital works associated with the Central Processing Plant expansion, advanced Mine Unit 4 development and commenced operations in this new low-pH mine unit at Lance. The uranium grades achieved from these wellfields to date have been highly encouraging and materially stronger than those achieved during prior alkaline operations, reinforcing our confidence in the underlying quality of the resource and the long-term value potential of the Lance Project. As part of the finalisation of the financial statements, the Company has recognised a non-cash impairment principally relating to legacy wellfield development assets associated with Mine Units 1, 2 and 3, together with certain historically capitalised costs. This accounting expense reflects our decision to focus future technical, operational and capital resources on Mine Unit 4 and future mine development and does not alter the Board’s confidence in the long- term value and potential of the broader Lance Project. Bringing the Lance Project back into production required us to change from an alkaline leach basis to a low-pH (mildly acidic) leach basis. While the use of the low-pH leach basis at uranium in-situ recovery operations is commonplace around the world, this is the first time it has been applied at a uranium mine in the United States for several decades. While the Company was able to undertake a range of positive laboratory tests and small-scale field trials using the low-pH basis prior to commencing development, the past year has shown us that we still have a lot to learn about how to most effectively develop, operate and maintain the wellfields at Lance. Material progress was made with the development of Mine Unit 4 during the year, and we commenced acidification of the first header house (Header House 14) in this mine unit in late December 2025. Encouragingly, flowrates during the initial acidification period were stronger than what was seen from the header houses in Mine Unit 3. However, as acidification progressed, the combination of injecting both sulphuric acid and hydrogen peroxide from the commencement of acidification appeared to cause a buildup of gas in the mining formation, as well as the precipitation of solids, leading to a drop-off in flowrates and increased wellfield maintenance requirements. As we have adopted the learnings from acidifying and operating Header House 14 and Header House 16 – the second header house to be commissioned in Mine Unit 4 – the site team has modified acidification phase operating procedures and wellfield maintenance practices for subsequent header houses, which we expect will have a positive impact on maintaining flow rates in new header houses. Due to the nature of in-situ recovery mining, our ability to see the results of these changes is measured in months, not in days or weeks. David Coyne Non-Executive Chair Peninsula Energy Limited | Annual Report 20263
While maintaining flowrates has so far proven challenging, the early uranium head grades that we have seen across extraction wells in Header Houses 14 and 16 have certainly been very encouraging, and significantly better than what was achieved during the unsuccessful alkaline-based operations. As a reminder, production at the Lance Project was paused after three years of operations due to lower-than-anticipated uranium head grades from the wellfields, not due to insufficient wellfield flowrates. In fact, flow rates in the original alkaline wellfields in Mine Units 1 and 2 were generally consistent with expectations. I expect that most, if not all, of our shareholders will be disappointed and frustrated with the production performance over the past year. The Peninsula Board, executive leadership team and site personnel all share this frustration. Our team – supported by recently bolstered specialist technical resources – is working extremely hard to better understand the most effective wellfield chemistry mix that will achieve targeted uranium head grades without impeding wellfield flow rates. We feel confident we are on the right track to overcoming the wellfield challenges experienced to date and unlocking the potential value we believe is inherent in the Lance Project. As we continue these actions, we do so against the backdrop of an ever- improving market for nuclear power generation globally and for uranium, the predominant fuel used by global nuclear power generators. The past year has seen the base price for uranium to be delivered under long-term contracts exceed US$90/lb U 3 O 8 and continue its march beyond US$100/lb U 3 O 8 . A range of nations across the globe are actively pursuing the development of new carbon-friendly nuclear power generation facilities, either through traditional large-scale plants or through newer technologies such as small modular reactors. Growth in nuclear power supports increased demand for uranium at a time when new uranium supply is taking longer to develop and some existing Tier-1 uranium mines are moving toward the end of their life-cycle. Our goal remains to be a long-term and reliable supplier of uranium into this improving market. Resolving our wellfield challenges as quickly as possible is an imperative value-driver for the Company and our shareholders, as I firmly believe that resource companies that are in production during the period of a positive cycle for their commodity typically deliver the best value for their shareholders. Looking ahead, I am excited and optimistic about the opportunities that lie ahead for the Company. Over the past 1 to 2 years, we have established the infrastructure, assembled the team and gained valuable operational experience that will support future improvements in wellfield performance. While challenges remain, the encouraging uranium grades, ongoing operational refinements and supportive uranium market fundamentals give me confidence that Peninsula is moving in the right direction. Our focus remains firmly on translating this progress into sustainable production and delivering long-term value for our shareholders. Once again, I would like to thank our shareholders for their ongoing support of the Company and our employees. Restarting projects is not easy – I think that is evident from what has transpired for a range of companies in a range of commodities over the past 12 to 24 months. Even though we have faced our share of challenges, our team is working methodically and diligently to develop solutions to these challenges and, on behalf of my fellow Directors I would like to thank them for their ongoing hard work and commitment to the Lance Project and the Company. Yours faithfully, David Coyne Non-Executive Chair 29 September 2026 We have established the infrastructure, assembled the team and gained valuable operational experience that will support future improvements in wellfield performance. “ “ Peninsula Energy Limited | Annual Report 20264
The Board of Peninsula looks forward to continuing to advance and develop Lance to become a critical US uranium project. Peninsula Energy Limited | Annual Report 20265
Corporate Governance Statement Peninsula Energy Limited | Annual Report 20266
Board Composition
The skills, experience, and expertise
relevant to the position of each Director
who is in office at the date of the annual
report and their term of office are
detailed in the Directors’ Report.
The names of the Directors of the
Company, or who have served as a
Director during the year, are:
David Coyne
Non-Executive Chair (Independent)
George Bauk
Managing Director /
Chief Executive Officer
Brian Booth
Non-Executive Director (Independent)
Keith Bowes
Non-Executive Director (Independent)
(appointed 12 August 2025)
Tejal Magan
Non-Executive Director (Independent)
(appointed 15 September 2025)
Harrison Barker
Non-Executive Director (Independent)
(resigned 29 July 2025)
Mark Wheatley
Non-Executive Director (Independent)
(resigned 29 July 2025)
The Board considers that an Independent
Director is a Non-Executive Director who
also:
•Is not a substantial shareholder
of the Company or an officer of,
or otherwise associated directly
with or nominated by, a substantial
shareholder of the Company;
•Within the last three years has not
been employed in an executive
capacity by the Company or another
group member or been a director
after ceasing to hold any such
employment;
•Within the last three years has
not been a principal of a material
professional adviser or a material
consultant to the Company or
another group member, or an
employee materially associated with
the service provider;
•Is not a material supplier or customer
of the Company or other group
member, or an officer of or otherwise
associated directly or indirectly with
a material supplier or customer;
•Has no material contractual
relationship with the Company or
another group member other than
as a director of the Company;
•Has not served on the Board
for a period that could, or could
reasonably be perceived to,
materially interfere with the
director’s ability to act in the best
interests of the Company; and
•Is free from any interest and any
business or other relationship
that could, or could reasonably be
perceived to, materially interfere
with the director’s ability to act in the
best interests of the Company.
Non-Executive Directors have the right
to seek independent professional advice
in the furtherance of their duties as
Directors at the Company’s expense.
Written approval must be obtained from
the Chair prior to incurring any expense
on behalf of the Company.
Ethical Standards
The Board acknowledges and
emphasizes the importance of all
Directors and employees maintaining
the highest standards of corporate
governance practice and ethical conduct.
A Code of Conduct has been established
requiring Directors and employees to:
•Act honestly and in good faith;
•Exercise due care and diligence in
fulfilling the functions of office;
•Avoid conflicts and make full
disclosure of any possible conflict of
interest;
•Comply with the law; and
•Encourage the reporting and
investigating of unlawful and
unethical behaviour.
Directors are obliged to be independent
in judgment and ensure all reasonable
steps are taken to ensure due care is
taken by the Board in making sound
decisions.
Diversity
The Board has adopted a Diversity
Policy as per the recommendations.
The Diversity Policy addresses equal
opportunities in the hiring, training,
and career advancement of directors,
officers, and employees.
The Diversity Policy outlines the
processes by which the Board will set
measurable objectives to achieve the
aims of its Diversity Policy, with focus on
gender diversity within the Company.
The Company is committed to inclusion
at all levels of the organisation, regardless
of gender, marital or family status,
sexual orientation, gender identity, age,
disabilities, ethnicity, religious beliefs,
cultural background, socio-economic
background, perspective and experience.
The Board is responsible for monitoring
Company performance in meeting the
Diversity Policy requirements, including
the achievement of diversity objectives
if and when such objectives are set.
The Company is focused on providing
a range of business and employment
opportunities for all members of the
communities in which it operates in.
Unless disclosed below, all the best practice recommendations of the 4th edition
of the ASX Corporate Governance Council have been applied for the entire
financial year ended 30 June 2026.
Peninsula Energy Limited | Annual Report 20267
Gender Diversity The Board is committed to workplace diversity and supports representation of women at the senior level of the Company and on the Board. As the Company has recently been commissioning newly constructed processing facilities and ramping-up wellfield production at the Lance Project, and given the size of the Company, the Board has not set gender diversity objectives. As the Company works through production ramp-up challenges at the Lance Project over the next year or so, the Board will evaluate whether the setting of meaningful gender diversity objectives are appropriate for the Company. The Company considers the current Board with one female and four male Board members to be effective and possessing a wide range of complementary skills. All Board appointment processes are conducted in a manner that promotes gender diversity, including establishing a structured approach for identifying a pool of candidates, using external experts where neces s ar y. Women Employees, Executives and Board Members The Company has one female Board member. As at 30 June 2026, the Company and its consolidated entities had nine (2025: seven) female employees: •a geologist, •an accounts payable clerk, •a land/payroll manager, •a procurement & inventory manager, •a manager of human resources, •a manager of accounting, •a business service specialist, •a lead shift operator, •a construction & maintenance technician. Female employees represent approximately 13% (2025: 11%) of the total employees of the Group. DescriptionMale%Female% 30 June 2026 Board of Directors375.0%125.0% Senior management8100.0%00.0% Other employees5686.1%913.9% To t a l678 7.0 %1013.0% 30 June 2025 Board of Directors5100.0%00.0% Senior management9100.0%00.0% Other employees4285.7%714.3% To t a l5688.9%711 .1% Trading Policy The Board has formally adopted a Securities Trading Policy in line with Corporate Governance guidelines which restricts Key Management Personnel from acting on material information until it has been released to the market and adequate time has been given for this to be reflected in the security’s prices. Key Management Personnel are those persons having authority and responsibility for planning, directing and controlling the activities of the Company and/or subsidiaries of the Company, directly or indirectly, including any Director (whether executive or otherwise) of the Company and/or a subsidiary of the Company. Whistleblower and Anti-Bribery and Corruption Policy The Board has in place Whistleblower, Anti-Bribery and Corruption Policies in line with recommendations of the 4th edition of the ASX Corporate Governance Council. The Board generally reviews the policies on an annual basis, and no changes were made to any of these policies during the year. Audit, Risk and Sustainability Committee During the year the Audit, Risk and Sustainability Committee consisted of three Non-Executive Directors throughout the majority of the year and had an independent Chairperson. The number of directors on the Committee during the year is consistent with the ASX Corporate Governance Council recommendations and is appropriate for the size of the Company. The Chief Financial Officer and Company Secretary are also present at all Audit, Risk and Sustainability Committee meetings. The Audit, Risk and Sustainability Committee operates under a Board approved charter. In addition to assisting the Board with its oversight of audit and risk matters, the purpose of the Committee is to now also assist the Board in fulfilling its oversight responsibilities in relation to the Company’s sustainability-related matters. Key aspects of the Audit, Risk and Sustainability Committee’s responsibility include matters related to its employees, governance, health and safety, environmental stewardship, community engagement and sustainability reporting. The names and qualifications of those appointed to the Audit, Risk and Sustainability Committee are included in the Directors’ Report, together with their attendance at meetings held during the year. ww Peninsula Energy Limited | Annual Report 20268
Shareholder Rights
Shareholders are entitled to vote on
significant matters impacting on the
business, which include the election and
remuneration of Directors, changes to
the constitution and receipt of annual
and interim financial statements.
Shareholders are strongly encouraged
to attend and participate in the Annual
General Meetings of Peninsula Energy
Limited, to lodge questions to be
responded to by the Board and/or the
CEO and can appoint proxies.
Risk Management
The Board considers identification and
management of key risks associated
with the business as vital to maximise
shareholder wealth. The Chief Financial
Officer has been delegated the task
of implementing internal controls to
identify and manage risks for which
the Board provides oversight. The
effectiveness of these controls is
monitored and reviewed as required.
The volatile economic environment has
emphasised the importance of managing
and reassessing the Company’s key
business, social and environmental risks.
Remuneration Policies
The Remuneration Committee is
responsible for determining and
reviewing the appropriate compensation
arrangements and policies for Key
Management Personnel, in accordance
with the policies and procedures outlined
in the Remuneration Committee
Charter. The Remuneration Committee
reviews executive packages annually by
reference to Company performance,
executive performance, comparable
information from industry sectors and
other listed companies.
The Company’s Remuneration Policy
is to ensure remuneration packages
properly reflect each person’s duties
and responsibilities and support the
Company’s business objectives. The
Policy is designed to attract the highest
calibre directors, executives, and senior
staff, and is intended to reward them for
performance which results in long-term
growth in shareholder value.
Executives and selected senior staff
are also entitled to participate in the
employee share, restricted share units,
performance rights, service rights and
option arrangements.
The amount of remuneration for
all Key Management Personnel of
the consolidated group, including
all monetary and non-monetary
components, is detailed in the
Remuneration Report within the
Directors’ Report. Shares awarded to Key
Management Personnel are valued at
the market price of those shares. Rights
and Options are valued independently
using either the Hoadley Trading and
Investment Tools (‘Hoadley’) ESO2
valuation model or where appropriate the
Black-Scholes model.
The Board believes that the
remuneration structure adopted results
in the Company being able to attract
and retain the best directors, executives,
and senior staff required to run the
consolidated group. It is also intended to
provide executives with the necessary
incentives to achieve and exceed targets
and grow long-term shareholder value.
The payment of cash bonuses, security
awards and other incentive payments
is reviewed by the Remuneration
Committee annually as part of the
review of executive remuneration and
a recommendation is put to the Board
for approval. All cash bonuses, security
awards and other incentives are ordinarily
linked to predetermined performance
criteria. The Board can exercise its
discretion in relation to approving
incentives, cash bonuses and share-
based awards, and can recommend
changes to the Remuneration
Committee’s recommendations. Any
changes must be justified by reference
to either measurable performance
criteria or other relevant circumstances
applicable to the Company.
Remuneration Committee
The Remuneration Committee currently
comprises three Non-Executive
Directors and has an independent
Chairperson, consistent with the
ASX Corporate Governance Council
recommendations.
The names of the members of the
Remuneration Committee and
their attendance at meetings of the
Committee are detailed in the Directors’
Report.
Nomination Committee
(now disbanded)
The Nomination Committee previously
comprised three Non-Executive
Directors. Given the size of the Company
and the Board renewal process
completed between November 2024
and September 2025, the Board has
disbanded the Nomination Committee
with this function now undertaken by the
full Board.
The Company has a procedure guideline
for the selection and appointment
of Directors. New candidates are
considered with reference to a number
of factors which include, but are not
limited to, their relevant experience,
expertise and professional qualifications,
compatibility with the existing Board and
possession of complimentary skill sets,
absence of conflicts of interest or other
legal impediments to serving on the
Board, credibility within the Company’s
industry and scope of activities and their
overall integrity and reputation.
The Company has in place appropriate
procedures to ensure that material
information relevant to a decision to re-
elect a Director is disclosed in the notice
of meeting provided to security holders.
Other Information
Further information relating to the
Company’s corporate governance
practices and policies has been made
available publicly on the Company’s
website at www.pel.net.au.
Peninsula Energy Limited | Annual Report 20269
Directors’ Report Peninsula Energy Limited | Annual Report 202610
Your Directors present their report, together with the financial statements
of the “consolidated group” (or “Peninsula”), being the Company and its
controlled entities, for the financial year ended 30 June 2026.
Directors
The names of Directors in office at any
time during or since the end of the year
are:
David Coyne
Non-Executive Chair (Independent)
George Bauk
Managing Director /
Chief Executive Officer
Brian Booth
Non-Executive Director (Independent)
Keith Bowes
Non-Executive Director (Independent)
(appointed 12 August 2025)
Tejal Magan
Non-Executive Director (Independent)
(appointed 15 September 2025)
Harrison Barker
Non-Executive Director (Independent)
(resigned 29 July 2025)
Mark Wheatley
Non-Executive Director (Independent)
(resigned 29 July 2025)
Directors have been in office since the
start of the financial year to the date of
this report unless otherwise stated.
Principal Activities
The principal activities of the
consolidated group during the financial
year consisted of uranium exploration,
mine development and commissioning
activities and uranium production ramp-
up at the 100% owned Lance Project
located in Wyoming, United States of
America, with the objective of becoming
a long-term commercially sustainable
uranium producer using the low pH ISR
leaching methodology.
Forward Looking Statements
Statements relating to the estimated or
expected future production, operating
results, cash flows and costs and
financial condition of Peninsula’s planned
work at the Company’s projects and
the expected results of such work are
forward-looking statements. Forward-
looking statements are statements that
are not historical facts and are generally,
but not always, identified by words
such as the following: expects, plans,
anticipates, forecasts, believes, intends,
estimates, projects, assumes, potential
and similar expressions. Forward-looking
statements also include reference to
events or conditions that will, would,
may, could or should occur. Information
concerning exploration results and
mineral reserve and resource estimates
may also be deemed to be forward-
looking statements, as it constitutes a
prediction of what might be found to be
present when and if a project is actually
developed.
These forward-looking statements are
necessarily based upon a number of
estimates and assumptions that, while
considered reasonable at the time
they are made, are inherently subject
to a variety of risks and uncertainties
which could cause actual events or
results to differ materially from those
reflected in the forward-looking
statements, including, without limitation:
uncertainties related to changes in
planned work resulting from logistical,
technical or other factors; the possibility
that results of work will not fulfil
projections/expectations and realise the
perceived potential of the consolidated
group’s projects; uncertainties involved
in the interpretation of drilling results
and other tests and the estimation of
uranium reserves and resources; risk of
accidents, equipment breakdowns and
labour disputes or other unanticipated
difficulties or interruptions; the
possibility of environmental issues
at the consolidated group’s projects;
the possibility of cost overruns or
unanticipated expenses in work
programmes; the need to obtain permits
and comply with environmental laws
and regulations and other government
requirements; fluctuations in the
price of uranium and other risks and
uncertainties.
Peninsula Energy Limited | Annual Report 202611
Review of Operations Peninsula Energy Limited (‘Peninsula’ or ‘the Company’) is an ASX-listed uranium mining company with 100% ownership of the Lance Project (Lance) and Dagger Project (Dagger), located in Wyoming, USA, which are operated by Peninsula’s wholly-owned subsidiary, Strata Energy, Inc (Strata). Lance Project, Wyoming The Company’s flagship Lance Project, located in the Tier-1 mining jurisdiction of Wyoming, comprises the Ross Production Area, Kendrick Mining Area and Barber Exploration Area. Following the delivery of a Production Reset Plan for the Lance Project in July 2025, Peninsula’s focus throughout the reporting period was on delivering improved, more consistent flow rates from wellfields, implementing optimised wellfield pattern designs, and progressing commissioning of the newly expanded Central Processing Plant (C PP). First dried yellowcake was produced from the expanded Lance CPP in September 2025. While meaningful operational progress was achieved during the financial year, the wellfield production ramp-up has proven to be more challenging than originally anticipated and, as a result, the Company’s previously announced CY2026 production guidance of 400,000 to 500,000 pounds of U 3 O 8 was withdrawn subsequent to the end of the reporting period. Importantly, management’s view is that the challenges encountered during the reporting period are operational rather than fundamental in nature. They relate primarily to wellfield hydraulics, wellfield acidification practices, wellfield maintenance practices, solution flow management and chemistry optimisation, rather than the quality of the Lance uranium resource or the effectiveness of the low-pH ISR recovery process that is clearly demonstrating significantly higher head grades than the prior alkaline leach method. While the timing of the production ramp- up has changed, the Company’s view of the fundamental value and long-term potential of the Lance Project has not changed. Strong uranium head grades from Header House 14 “HH14” under low-pH operations, the progress being achieved with the ongoing acidification success, ongoing training of personnel, and expected operating cost improvements stemming from the implementation of an owner-operator drilling strategy continue to support the Company’s confidence in the project’s future production profile and economics. Image 1: Lance Project Peninsula Energy Limited | Annual Report 202612
Uranium Production: 4Q26 J u n-2 6 3Q26 Mar-26 2Q26 D e c-2 5 1Q26 S e p -2 5 To t a l FY26 4Q25 J u n-2 5 3Q25 Mar-25 2Q25 D e c-2 4 1Q25 Sep-24 To t a l FY25 Pounds captured on resin13,8893,9727,36910125,3313295,9751,014-7, 3 1 8 Pounds drummed11,4822,0673,0008361 7, 3 8 5----- Pounds delivered to converter10,596---10,596----- Produced pounds sold10,066---10,066----- Non-produced pounds purchased/borrowed -----200,000---200,000 Non-produced pounds sold-----200,000--200,000 U 3 O 8 Inventory (as at): 30 June 202630 June 2025 Pounds in circuit16,5478,601 Pounds drummed at site17,38515,183 Pounds drummed at converter530- Uranium production was lower than expected during the financial year due to several operational factors: •CPP Commissioning Issues - During the financial year, commissioning of the CPP expansion was impacted by the failure of agitator assemblies in both precipitation tanks (CPP Phase 2) and corrosion issues in piping within the original CPP area (CPP Phase I). Both issues were successfully remediated during the financial year, with the focus now on optimising the elution, precipitation, filter press, and drying circuits as part of the CPP Phase 2 ramp-up. Failure of the agitator assemblies in both precipitation tanks was caused by the incorrect installation by the EPC contractor, and the repairs costs were paid for by the EPC contractor as a warranty item. •MU-4 Performance (HH14 and HH16) - Flow rate challenges were experienced within MU-4, particularly at Header House 14 (HH14), where gassing issues significantly impacted hydraulic performance and resulted in limited uranium production. Significant remediation efforts were undertaken, including recovery well modifications and back- circulation programs to address the root causes and restore wellfield performance. Hydrogen peroxide injection was temporarily suspended for approximately six weeks while the investigation and remediation activities were completed. This adversely affected uranium grades during the period, however grades began recovering following the recommencement of hydrogen peroxide injection in mid-May 2026 and improved toward the end of the June 2026 Quarter. Header House 16 (HH16) experienced similar gassing- related challenges and also delivered limited uranium production. •MU-3 Performance - Flow rates within MU-3 remained below expectations and are materially lower than those achieved within MU-4. The lower flow environment results in longer pore-volume residence times, delaying the response to chemistry adjustments, including hydrogen peroxide injection, making the flowrate challenge in MU-3 more difficult to address was the decision by the former leadership team for single wells to target up to 3 mining zones. Following the withdrawal of CY2026 production guidance, the decision was made to reduce wellfield maintenance support activities within MU-3 and reprioritise resources toward higher-return production areas. This decision should not be interpreted as a reduction in the Company’s long- term resource base or production potential, but rather as a disciplined allocation of operational resources to support sustainable production growth and improved returns. •MU-1 Performance - Flow rates within MU-1, an area previously subject to mining and depletion using an alkaline leach method, were generally in line with expectations, however uranium grades remained below forecast. Consistent with the Company’s revised operating strategy following the withdrawal of CY2026 production guidance, wellfield maintenance activities within MU-1 have been scaled back in favour of higher-priority production areas. This approach reflects prudent resource allocation. •Ion Exchange (IX) Circuit Commissioning - During commissioning of Trains 3 and 4 of the IX circuit as part of Phase 2, elevated tail concentrations were identified. Investigation confirmed that the primary cause was incorrect valve installation during construction. All identified valves have been inspected and rectified, with final verification activities scheduled for completion in early August 2026. The timing of the commissioning of IX circuits was delayed due to the agitator issues reported in February and rectified in April 2026. •Additional well maintenance requirements - Following resolution of the agitator issues, the Company identified the need for an extensive well maintenance program across portions of the wellfield. During the period in which the CPP was offline due to the corrosion issues and limited on-site resin storage capacity, a number of acidified wells remained idle for an extended period. These conditions contributed to the flow rate issue and reduced well performance, requiring maintenance activities to restore flow rates and well productivity. The maintenance program impacted production during the June 2026 quarter. Peninsula Energy Limited | Annual Report 202613
Production Guidance Update (released on 22 July 2026) During the first half of CY2026, the Company continued the commissioning and ramp-up of Lance’s low-pH ISR operations while progressing the development of MU-4, the Project’s primary production area in CY2026 and CY2027. Although meaningful operational progress has been achieved, the production ramp-up has progressed more slowly than originally anticipated and, as a result, the Company’s previously announced CY2026 production guidance of 400,000 to 500,000 pounds of U 3 O 8 was withdrawn subsequent to the end of the reporting period. When CY2026 production guidance was established, the Company expected the successful development and commissioning of MU-4 to offset lower- than-expected production from MU-3, consistent with previous market updates. At the time of reiterating CY2026 production guidance, early acidification results from within MU-4 were encouraging, additional header houses were advancing on schedule, gassing issues experienced in the wellfields were being resolved and management expected production rates to progressively increase as new production areas were brought online. However, the Company encountered a number of operational challenges, including resolution of gas generation within sections of the wellfield taking longer than expected, resulting in lower- than-expected solution flow rates, and the ongoing optimisation of wellfield chemistry. These factors have extended the time required to achieve stable production but have also provided valuable operational experience that is now being incorporated into future wellfield development. As the effect of wellfield chemistry changes are best implemented at the commencement of acidification of each new header house, it takes a period of time to assess the impact of changes and determine which changes are the most effective moving forward. While the timing of the production ramp- up has changed, the Company’s view of the fundamental value and long-term potential of the Lance Project has not changed. Strong uranium head grades from HH14 under low-pH operations, the progress being achieved with the ongoing acidification success, ongoing training of personnel, and expected operating cost improvements stemming from the implementation of an owner- operator drilling strategy continue to support the Company’s confidence in the project’s future production profile and long-term commercial sustainability. Notwithstanding this confidence in the long-term outlook for Lance, the operational experience gained from the transition to low-pH ISR mining has resulted in the Company recognising a non-cash impairment charge in respect of certain wellfield development assets associated with Mine Units 1, 2 and 3. The impairment reflects revised expectations regarding the future utilisation and recoverability of these legacy wellfield assets following changes to wellfield design, wellfield maintenance practices and operating methodologies, and does not represent a change in the Company’s view of the overall value or future potential of the Lance Project. The operational experience gained during the first half of the 2026 calendar year has resulted in a number of important changes to future development plans, including revised acidification methods, modified wellfield design, optimisation of hydrogen peroxide management (oxidant added to improve the rate of uranium extraction), enhanced flow recovery programs and modifications to future header house development and commissioning activities. These learnings are now being incorporated into HH15, HH17, HH18 and HH19 and are expected to support improved production outcomes moving forward. Operational Update Encouragingly, the uranium grade response observed to date supports management’s confidence in the underlying Lance uranium resource and low-pH extraction methodology. Header House 14 (HH14) achieved average uranium concentrations of approximately 50-60 mg/L U 3 O 8 during May and June 2026 (corresponding to Pore Volumes 5 to 6), with multiple individual patterns reporting grades between 154-374 mg/L U 3 O 8 and peak grade within an individual well of 476 mg/L U 3 O 8 . These results compare favourably with historical alkaline ISR operations at Lance, which only achieved an average grade of 22 mg/L U 3 O 8 , demonstrating that uranium mobilisation under low-pH recovery is performing strongly. While production volumes have been impacted by hydraulic performance and wellfield optimisation challenges, the grade response achieved to date indicates that the primary issues encountered during ramp-up relate to the efficient movement and management of solutions through the orebody rather than the quality of the resource itself. Management believes the operational experience gained during this period has significantly enhanced its understanding of wellfield behaviour and positions the Company to achieve better production performance as improvement initiatives continue across the project. Ongoing wellfield maintenance practices are an example of this where treatment methods continue to be refined for wells that have seen flow rates decrease from the rates at the time of initial operation. Factors that have impacted production during the year included: •Timing and rate of hydrogen peroxide addition as they relate to gas generation mechanisms and the impact on uranium head grades, noting that hydrogen peroxide addition was halted for extended portions of the ramp-up period to help manage the gassing issue. •Operational complexities associated with co-mingled acidification and production activities between adjacent header houses, particularly during the early stages of MU-4 operation. •Lower-than-expected production flow rates across parts of the developing production footprint despite extensive maintenance and optimisation efforts. •Gas generation within portions of the operating wellfield, which reduced recovery performance, injection performance and overall flow rates. Since that time, Peninsula has increased its production footprint and accumulated substantially more operating data across multiple production areas. While acidification performance has largely progressed in line with expectations and the Company continues to gain confidence in the suitability of the orebody for low-pH ISR mining, operational performance during ramp-up has been impacted by several factors which were not fully understood when guidance was most recently reiterated. Peninsula Energy Limited | Annual Report 202614
Step Change in Wellfield Development Costs In parallel with operational improvements, Peninsula has commenced several initiatives designed to improve safety, project economics, reduce dependency on contractors and lower cash costs. The most significant initiative is the proposed transition of drilling activities to an owner-operated model. Once fully implemented, management expects this initiative to reduce drilling costs significantly. The Company has engaged the services of Mr Kent Swick, founder and former Managing Director of Swick Mining Services, to review drilling operations and provide a strategic plan for drilling going forward. The Company’s first owner- operated drill rig was delivered on 20 July 2026. The Company is also advancing a broader cost improvement program focused on wellfield infrastructure optimisation, reagent consumption improvements, field maintenance efficiency, automation opportunities and production system reliability improvements. These initiatives are expected to lower the project’s operating cost base while supporting future production growth. Sales and Marketing The Company retains significant sales and marketing flexibility, with only one remaining long-term contract commitment (2028 – 2033, 100,000lbs p.a.), positioning Peninsula to benefit from improving uranium market fundamentals as production increases. Dagger Project, Wyoming The Dagger Project (Dagger) is a high- grade, satellite uranium development introduced in October 2023. Located in Crook Country, Wyoming within the Black Hills district in the north-east corner of the State, it lies approximately 20km north-east of the Company’s CPP at the Lance Project. With a JORC (2012) Inferred Resource of 6.9 million pounds U 3 O 8 at an average grade of 1,037ppm, Dagger provides the Company with the opportunity to extend the Lance project life through a possible future satellite ISR operation. At over twice the grade of U 3 O 8 compared to the Lance Resource, Dagger provides the Company with a relatively high-grade uranium resource, location diversity within a tier-1 mining jurisdiction and further opportunities to increase the scale and quality of Peninsula’s mineral resource holdings. Dagger was established through a series of mineral rights and data acquisition transactions spanning an eight-year period at a cost of only approximately US$800,000 (or US$0.12/lb U 3 O 8 ). The combined State and Federal Mineral rights cover an area with historically identified uranium mineralisation contiguous to past uranium mining sites. During the financial year, the Company continued its review of existing drill data to support planning for a future drilling program aimed at upgrading resource confidence levels. In parallel, Peninsula appointed WWC Engineering to commence a Scoping Study to evaluate development options. Image 2: Dagger Project Peninsula Energy Limited | Annual Report 202615
Sustainability Peninsula’s sustainability initiatives and commitments are detailed in the Sustainability Report for the year ended 30 June 2026. Key outcomes included: Safety Two Lost Time Injuries (LTI’s) occurred on site during the reporting period. The sitewide Total Recordable Injury Frequency Rate (TRIFR) at the end of the reporting period was 3.16, a decrease from the TRIFR at 30 June 2025 of 3.44. Environment There were four reportable spills during the financial year – one in MU-1 when a well was restarted while disassembled, one in MU-4 due to a bleed valve on an injection well left open, two in MU-3 from injection well failures and one in MU-1 from a Victaulic clamp failure. The spills were all contained on site and required minimal remediation. Cultural Heritage Project Archaeological evidence indicates at least 11,000 years of human activity in the vicinity of the Lance Project. Strata Energy act as custodians for a website created specifically for the Little Missouri Headwaters Cultural Heritage Project, allowing users to learn more about the area’s traditional religious and cultural importance where direct access to those properties might not be possible. Community Since inception, Strata Energy has awarded over 50 scholarships to Crook County students through the Community Energy Scholarship for students who study in the field of science, technology, engineering or mathematics and the Opportunity Scholarship, for high school graduates pursuing trades or college education. Outlook Nuclear power is increasingly recognised as essential to energy security and decarbonisation. Globally, governments are extending the life of existing reactors, approving new builds, and providing targeted policy support to meet net-zero commitments. China’s reactor expansion program, reactor restarts in Japan and Europe, and growing demand from emerging economies underpin a positive long-term outlook for uranium. In the United States, nuclear energy is being repositioned as a cornerstone of energy security and energy dominance. The U.S. remains the world’s largest consumer of uranium, requiring more than 50 million pounds U 3 O 8 annually, yet domestic production currently totals only two million pounds per annum (less than 5% of consumption). Recent policy initiatives, including Executive Orders under the Trump Administration and bipartisan Congressional support, emphasise the importance of rebuilding domestic nuclear fuel supply chains. Measures include government-backed uranium purchasing programs, funding for advanced reactor technologies, and a ban on Russian supply. At the same time, a new demand driver is emerging from the technology sector. The rapid growth of artificial intelligence and data centres is driving unprecedented electricity requirements. Major U.S. technology companies have publicly committed to long-term, carbon-free energy procurement, and several have announced direct investments in nuclear power projects and advanced reactor development. These initiatives highlight unique ability of nuclear energy to provide reliable, carbon-free baseload power at the scale required to support the digital economy. On the supply side, global uranium mine production continues to fall short of reactor requirements, with inventories and secondary supplies bridging the gap. Operational challenges in major producing regions such as Kazakhstan and Canada have further tightened supply, while utilities are accelerating contracting activity to ensure diversification and security of supply. The uranium price remains strong, reflecting the supply-demand imbalance and increasing utility contracting. Market commentators expect ongoing support in the medium term as demand growth outpaces new mine supply. Against this backdrop, the Lance Project in Wyoming positions Peninsula as a meaningful domestic supplier of uranium to the U.S. nuclear fuel cycle. While FY2026 presented a number of operational challenges, it also marked Peninsula’s transition from a paused alkaline leach producer using another facility to produce drummed yellowcake back to uranium production using the industry leading low-pH ISR method and producing drummed uranium from its own expanded facilities. The operational knowledge gained during the year, combined with a strengthened balance sheet, continued optimisation of the Lance Project and favourable long-term uranium market fundamentals, positions the Company to continue progressing its production ramp-up and longer-term growth strategy. Peninsula Energy Limited | Annual Report 202616
Corporate Board & Management Appointments The Company welcomed Mr Keith Bowes and Ms Tejal Magan to the Board of Directors as Non-Executive Directors of the Company during the financial year. Mr Bowes is a seasoned resources executive with 30 years of experience in project development and operations across Africa, South America, and Australia. He most recently served as Managing Director of Lotus Resources Limited from 2021 to 2025. Ms Magan is a financial executive with over 15 years of experience in technical accounting, corporate governance, risk management and compliance. Most recently, Ms Magan was instrumental in delivering the value accretive transaction between Spartan Resources Limited and Ramelius Resources Limited. Long standing Non-Executive Directors Mr Harrison Barker and Mr Mark Wheatley retired from the Board and Mr David Coyne transitioned from interim Chair to Non-Executive Chair of the Board. Subsequent to the end of the reporting period, the Company announced the appointment of experienced ISR uranium executive, Mr Gary Birch, as Chief Technical Officer effective 28th September 2026. Gary adds strong senior technical leadership across wellfield, plant, maintenance, engineering and major project disciplines. Establishment of Technical Committee Peninsula has established a Technical Committee to strengthen technical oversight, operational review and continuous improvement at the Lance Project. Non-Executive Director Mr Keith Bowes has been appointed Chair the Technical Committee, bringing extensive uranium, processing, project development and governance experience. Specialist ISR consulting group, Rendement, has been engaged to provide technical assistance and recommendations primarily focused on wellfield performance. The Technical Committee will support management’s ongoing operational improvement program, with a focus on wellfield hydraulics, chemistry optimisation, IX performance, mine development planning and technical capability building. Corporate finance Uranium Sales and Inventory One sales contract remains in place that requires aggregate delivery of 600,000 pounds U 3 O 8 , with annual deliveries of 100,000 pounds U 3 O 8
Sustainability Report 2026 Driving progress towards a greener tomorrow
The 4 Pillars of our
Sustainability Approach
Lasting value creation for our stakeholders by demonstrating the highest standards
of stewardship whilst actively monitoring and seeking to diminish any adverse
impacts that the Company’s decisions and activities may have on future generations.
Pillar 1:
Governance
Pillar 3:
Environment
Pillar 2:
Employees
Pillar 4:
Social
Contents
-
Introduction 2
1.1 Message from the Chief Executive Officer 3 1.2 About Peninsula Energy Ltd 4 1.3 Sustainability reporting roadmap 8 1.4 EESG Double Materiality Assessment 9 1.5 EESG and the uranium industry 10 1.6 EESG and in-situ uranium recovery 11 2. Governance 12 2.1 Corporate governance statement 13 2.2 Regulatory environment 18 3. Employees 20 3.1 Diversity, workplace culture and conduct 21 3.2 Health, safety and wellbeing 21 3.3 Attracting, developing and retaining our people 22 3.4 Health 23 3.5 Safety 24 3.6 Performance and long-service recognition 26 3.7 Wellbeing 26 3.8 Education and professional development 26 4. Environment 27 4.1 Environmental risk management 28 4.2 Lance’s estimated carbon footprint 28 4.3 Environmental Management Program 28 5. Social 37 5.1 Community Outreach and Communication Policy 38 5.2 Little Missouri Headwaters Cultural Heritage Project 38 5.3 Strata Energy Scholarship Programs 39 5.4 Procurement and recruitment 39 5.5 Extraction royalties 39 5.6 Participation on industry bodies / associations 39 5.7 Disclaimer 39 5.8 References 39 Peninsula Energy Limited | Sustainability Report 20261
- Introduction Peninsula Energy Limited | Sustainability Report 20262
1.1 Message from the Chief Executive Officer
The 2026 financial year was a significant
year for Peninsula Energy Limited
(Peninsula or the Company) as we
continued the transition of the Lance
Uranium Project (Lance) toward
sustained uranium production. During
the year, we completed construction
of Phase 2 of the Central Processing
Plant, advanced wellfield development
activities and continued to build the
operational capability required to
support long-term production from our
low-pH in-situ recovery operation in
Wyoming, USA.
As we increased operational activity,
we gained valuable insights into
the challenges associated with
commissioning and ramping up a
complex uranium operation. While
progress was made across many areas of
the business, we also experienced safety
and environmental incidents that did not
meet our expectations. We take these
matters seriously and recognise that
a strong safety culture and disciplined
environmental stewardship are
fundamental to our success.
In response, we strengthened our
operational focus through increased
field leadership engagement, enhanced
safety oversight, implementation of the
Take 5 pre-task risk assessment process,
and the establishment of a dedicated
spill committee to investigate incidents,
identify trends and support effective
corrective actions. These initiatives
reflect our commitment to continuous
improvement and our determination to
build an organisation where safety and
environmental responsibility underpin
every aspect of our operations.
Sustainability is integral to our business
strategy. Responsible management of
environmental, social and governance
matters is essential to maintaining the
trust of our employees, regulators,
local communities, shareholders and
other stakeholders. During FY2026, we
continued to enhance our governance
framework and advance initiatives that
support transparency, accountability and
long-term value creation.
A key milestone during the year was
the completion of a Sustainability and
Climate Reporting Gap Assessment
and Roadmap. This work provides
a structured pathway for improving
our sustainability disclosures and
preparing for evolving climate-related
reporting expectations. It also supports
our broader objective of embedding
sustainability considerations into
decision-making across the business.
Our people remain our greatest asset.
Throughout the year, we invested
in training, leadership development
and succession planning initiatives
designed to strengthen organisational
capability and support future growth.
We also recognised the contribution
of several long-serving employees
whose experience, commitment and
operational knowledge continue to play
an important role in the development of
Lance.
The role of nuclear energy in supporting
global decarbonisation continues to gain
recognition as governments seek secure,
reliable and low-carbon energy sources.
As a United States uranium producer,
Peninsula is well positioned to contribute
to this growing demand. We believe
that supplying uranium responsibly
requires not only operational excellence
but also a genuine commitment to
safety, environmental management,
workforce development and community
engagement.
While FY2026 presented challenges,
it also provided important lessons that
are helping shape a stronger business.
The knowledge gained through the
commissioning and ramp-up of Lance is
improving our systems, strengthening
our workforce and enhancing our
ability to deliver sustainable long-term
performance.
On behalf of the management team,
I would like to thank our employees,
contractors, local communities,
regulators, Board members and
shareholders for their continued support
throughout the year. We remain focused
on building a safe, responsible and
sustainable uranium producer that
creates value for all stakeholders while
contributing to a low-carbon energy
future.
George Bauk
Managing Director /
Chief Executive Officer
30 September 2026
George Bauk
Managing Director / CEO
2026 Sustainability
Highlights
Sustainability and
Climate Reporting
Gap Assessment and
Roadmap completed
Eight employees
recognised for 10 years
or more long-service
Leadership development
delivered to managers,
supervisors and team leaders
Governor’s Safety Award
(2nd place in uranium safety)
received at the Wyoming
Mining Association Annual
Convention
Peninsula Energy Limited | Sustainability Report 20263
1 INTRODUCTION
Integrity We are committed to be honest, transparent, ethical, and fair and recognise the importance of building trust in relationships with our internal and external stakeholders. We strive to be a good corporate citizen. Teamwork We encourage teamwork to improve performance and the achievement of common goals by providing our employees with a sense of belonging where they feel safe to share ideas and feel that their contributions are valued. Stewardship We recognise that our decisions and actions need to lead to responsible value creation that requires us to be mindful of the impacts that our decisions and actions may have on our stakeholders, society, future generations, and the environment. People The health and safety of our employees, contractors, and communities in which we operate is our number one priority. We value differences and show respect for the individual. Accountability We promote a culture whereby employees are encouraged to make decisions in a responsible manner and give due recognition to employee contributions. Simplicity We achieve efficiency by being responsive and agile through regular and clear communication and elimination of bureaucracy in our decision making. Innovation We encourage new ideas and the adoption of new technologies. Values Our values guide how we think, make decisions, and act at Peninsula. 1.2 About Peninsula Energy Ltd Peninsula Energy Limited (‘Peninsula’ or ‘the Company’) is an ASX-listed uranium mining company with 100% ownership of the Lance Project (Lance) and Dagger Project (Dagger), located in Wyoming, USA, which are operated by Peninsula’s wholly-owned subsidiary, Strata Energy, Inc (Strata). Our mission: Uranium extraction for a green energy future Corporate Strategy Peninsula’s primary objective over the near to medium term is to successfully ramp-up uranium production at Lance, which is licensed to produce up to 3 million lbs of uranium per year, using low pH ISR technology. Successfully transitioning Lance into a low pH ISR operation will provide a platform for Lance to become a viable, long-term operation. Peninsula Energy Limited | Sustainability Report 20264 1 INTRODUCTION
Approach to sustainability At Peninsula, we have identified and acknowledge the importance of instilling a culture where the Company acts lawfully, ethically, and responsibly. It is imperative for us to be able to demonstrate principles of good corporate citizenship in all aspects of our operations as we continue to progress our production ramp-up at Lance whilst also being able to clearly identify the impacts and areas of improvement related to the following four pillars: • Governance • Employees • Environment • Social In determining the pillars above, the Company identified the need to have a specific pillar dedicated to “employees”, which is a slight departure from the more commonly known environment, social and governance (ESG) to (EESG). Peninsula’s role in the achievement of the United Nations’ Sustainable Development Goals (SDG) The Sustainable Development Goals (SDGs), which were adopted by 193 United Nations member states, identified key areas of focus for inclusion in the world’s comprehensive plan of action for achieving sustainable development. Mining activities in general have the potential to contribute to all SDGs by enhancing their positive impacts or by preventing and mitigating their negative impacts on the economy, environment and people. By successfully bringing Lance into production Peninsula will make positive contributions towards achieving Goal 7: Affordable and Clean Energy and Goal 13: Climate Action by supplying uranium which is necessary for the low- carbon transition while mitigating GHG emissions through the use of renewable energy and energy efficiency measures. Through its employment policies and procedures, remuneration practices and health and safety policies the Company is making meaningful contributions to Goal 8: Decent Work and Economic Growth. With proper management and monitoring of environmental impacts and a focus on recruitment and procurement from the communities in which the Company operate, the Company can play a role and contribute to Goal 11: Sustainable Cities and Communities. The Company recognises its responsibility towards minimising its impacts with regards to Goal 6: Clean Water and Sanitation and Goal 15: Life on Land due to the impacts that Lance’s water use and land use can have on local communities and the environment. Lasting value creation for Peninsula’s stakeholders by demonstrating the highest standards of stewardship whilst actively monitoring and seeking to diminish any adverse impacts that the Company’s decisions and activities may have on future generations. “ We recognise that sustainability needs to be at the core of all four pillars as is evident from our definition of sustainable development: “ Peninsula Energy Limited | Sustainability Report 20265 1 INTRODUCTION
Peninsula’s EESG goals Peninsula has determined its high level EESG goals during its pre-commercial and production phases to be as follows: Table 1-1: EESG goals and progress during the pre-commercial production phase Pre-commercial production phaseProgress GOVERNANCE Formally adopt a recognised sustainability reporting framework by the end of the 2024 financial year including independent third-party verification; Following publication of the draft Treasury Laws Amendment (Financial Market Infrastructure and Other Measures) Bill 2024 by the Parliament of Australia formal adoption of a recognised sustainability reporting framework was deferred until promulgation of final legislation. During FY2026 Peninsula contracted an independent third-party consulting firm to conduct an ESG and Climate Gap Assessment and Roadmap to provide the Company with a structured understanding of its current sustainability reporting maturity and readiness for emerging disclosure requirements. The roadmap provides a structured pathway for Peninsula to strengthen its sustainability and climate-related reporting capability in preparation for potential future disclosure requirements under AASB S1 (voluntary) and AASB S2 (mandatory). Establish a Sustainability Committee as a sub-committee of the Peninsula Board to identify and monitor EESG risks and opportunities and to monitor the Company’s performance against identified EESG objectives; Achieved. A Sustainability Committee was established in May 2024 and this committee was tasked to develop a Charter defining the scope and responsibilities of the Committee. The Charter was adopted by the Board in July 2024. During the financial year the Audit and Risk Management Committee was restructured to also include oversight of the Company’s Sustainability practices. In addition to assisting the Board with its oversight of audit and risk matters, the purpose of the Committee is to now also assist the Board in fulfilling its oversight responsibilities in relation to the Company's sustainability-related matters. Key aspects of the Sustainability Committee’s responsibility include matters related to its employees, governance, health and safety, environmental stewardship, community engagement and sustainability reporting. The charter of the Audit, Risk and Sustainability Committee was subsequently revised to include sustainability related matters. Develop and implement human rights due diligence procedures for all material contracts; Ongoing. Publication of a Sustainability Report on an annual basis as part of the Company’s annual reporting cycle; This report is scheduled to be released with the Company’s annual report and will satisfy this objective. 100% compliance on the Company’s regulatory and statutory reporting obligations. Achieved. No instances of non-compliance identified. ENVIRONMENT 100% compliance with applicable environmental laws, regulations, license, and permit conditions at Lance; Achieved for FY2026. No notifications of environmental violations were received during FY2026. Ongoing refinement of Peninsula’s environmental and safety reporting metrics to support meaningful reporting on the Company’s performance against pre-determined targets during the commercial production phase; During FY2026 the Company implemented a health and safety database platform for training and incident reporting. Development and refinement is ongoing. Development and roll-out of action plans to report on Scope 2 and Scope 3 carbon emissions of Lance’s entire supply chain. Ongoing. During FY2026 the Company completed a Green House Gas Emissions (GHG) inventory register. The purpose of this register was to identify material emission sources, assign preliminary scope classifications, assess likely materiality, record current understanding, and identify information required from relevant departments to support the broader GHG inventory methodology and will provide the foundation for data collection and assurance readiness. This inventory register expanded on the life cycle GHG emission assessment for Lance that was commissioned during the 2024 financial year. Peninsula Energy Limited | Sustainability Report 20266 1 INTRODUCTION
Table 1-1: EESG goals and progress during the pre-commercial production phase (continued) Pre-commercial production phaseProgress EMPLOYEES KPI’s for all employees to contain performance criteria related to health, safety, environmental and / or governance matters relevant to their areas of responsibility; KPI’s containing health, safety, and environmental matters were included in the performance criteria set during FY2026. No fatal incidents, Lost Time Injuries (LTI) and Recordable Injuries; No fatal incidents were recorded for the Company’s employees or contractors during FY2026. Two Lost Time Injuries (one employees and one contractor) and four Recordable Injuries (all medical aid incidents) (four employees and no contractors) were recorded (FY2025: two employees and three contractors). The combined Total Recordable Injury Rate (TRIR) (including employees and contractors) was 3.16, which is approximately 8% lower than the FY2025 TRIR of 3.44) and approximately 37% higher than annual reported averages for the U.S. “Other metals” mining industry rates. No exceedances of radiation exposure limits to any employee or contractor working at Lance; Achieved for FY2026. Development and implementation of a diversity training module to be included as part of the induction program for all employees. The Company contracted an external party to assist with the development of a diversity, equity and inclusion (DEI) training module which was included in the Company’s annual training given to Lance employees and contractors during July 2024. SOCIAL Active engagement with local communities. Arrangements to participate in meetings with the County Commissioner’s Group on a quarterly basis has been formalised. The Company has delegated responsibility to one of its staff members to attend the quarterly meetings of the Local Emergency Planning Commission and the Company will continue with its membership of the Sundance Chamber of Commerce. At least two of the annual bursaries and scholarships awarded should be awarded to females; Two females and two males were each awarded a US$2,000 annual scholarship, and one male and two females were each awarded a US$500 scholarship during FY2026. 100% compliance with the Company’s Environmental Management Plan and Radiation Protection Plan; No violations documented during FY2026. Develop and implement procedures to enable reporting of local procurement spending from local suppliers and contractors as a percentage of Lance’s total procurement spending; For the FY2026 financial year US$14.0 million was procured from local suppliers and contractors (FY2025: US$8.4 million). This accounts for approximately 23.3% (FY2025: 9%) of Lance’s total procurement spending. More than 80% of employees to be employed locally from the communities in which we operate; Achieved. 86.9% (FY2025: 90.7%) of employees at Lance are from local communities. In assessing performance against this criteria, Sundance, Moorcroft, Hulett, Rozet, Gillette, Upton, Alva & Pine Haven have been determined to be the local community areas. Continued support to act as custodian of the website for the Little Missouri Headwaters Cultural Heritage Project. Achieved. The Company is continuing to act as custodian. Peninsula Energy Limited | Sustainability Report 20267 1 INTRODUCTION
Table 1-2: EESG goals during the commercial production phase
EESG goalsCommercial production phase
GOVERNANCE •Publication of a Sustainability Report on an annual basis as part of the Company’s annual reporting cycle;
•Develop and implement monitoring and reporting requirements in line with the requirements of the Modern
Slavery Act, 2018 (Australia);
•100% compliance on the Company’s regulatory and statutory reporting obligations.
ENVIRONMENT •100% compliance with applicable environmental laws, regulations, license, and permit conditions at Lance;
•100% compliance with Lance’s Environmental Management Plan and committed environmental monitoring
procedures;
•Reporting on the Company’s performance related to environmental matters in terms of pre-determined targets;
•Scope 1, 2 & 3 carbon emission reporting on Lance’s entire supply chain and ongoing investigation and
implementation of opportunities to reduce Lance’s Scope 1 and Scope 2 emissions.
EMPLOYEES •KPI’s for all employees to contain performance criteria related to health, safety, environmental and / or
governance matters relevant to their areas of responsibility;
•No fatal incidents and Lost Time Incidents (LTI) and Total Recordable Injury Rates (TRIR) to be 25% lower
than annual reported averages for the U.S. “Other metals” mining industry rates;
•No exceedances of radiation exposure limits to any employee or contractor working at Lance;
•The Company re-started production in September 2025 at Lance and continues to ramp up operations.
Given the present size of the Company, the Board has not set gender diversity objectives. As production
ramps-up at the Lance Project over the next 1 to 2 years, the Board will evaluate whether the setting of
meaningful gender diversity objectives is appropriate for the Company.
SOCIAL •Quarterly Local Community Engagement Forum meetings with local communities and other stakeholders;
•At least two of the annual bursaries and scholarships awarded should be awarded to females;
•100% compliance with the Company’s Environmental Management Plan and Radiation Protection Plan;
•Employment of at least one person with a permanent disability;
•More than 90% of employees to be employed locally from the communities in which we operate;
•Continued support to act as custodian of the website for
the Little Missouri Headwaters Cultural Heritage Project.
1.3 Sustainability reporting
roadmap
During the year Peninsula contracted an
independent third party consulting firm
to conduct an EESG and Climate Gap
Assessment to provide the Company
with a structured understanding of its
current sustainability reporting maturity
and readiness for emerging disclosure
requirements. The assessment assisted
the Company to establish a baseline
of Peninsula’s existing governance
structures, operational practices, data
availability and reporting processes
across key environmental, social
and governance topics, alongside
its preparedness for climate-related
financial disclosures under AASB S2.
The review benchmarked Peninsula
against two primary frameworks: the GRI
Mining Sector Standard (GRI 14), which
provides globally recognised guidance on
EESG disclosures specific to the mining
industry, and the Australian Sustainability
Reporting Standards (AASB S1 and
AASB S2), which introduce a financial
materiality lens and formalised disclosure
requirements for sustainability and
climate-related information. This dual-
framework approach provided valuable
information for Peninsula to understand
both its current voluntary ESG reporting
position and the level of uplift required
to support future mandatory climate-
related disclosure obligations.
Overall, Peninsula’s reporting maturity
was determined to be “foundational”,
with Peninsula deemed to be
demonstrating a strong foundational
position across a number of EESG
areas, supported by established
governance frameworks, environmental
management systems and sustainability
reporting practices.
Importantly, the assessment was
undertaken at a point in time where
Peninsula is ramping up production. As
such, it provides a forward-looking view
of how sustainability reporting practices
may need to evolve as the organisation’s
operational scale, risk profile and
stakeholder expectations continue to
develop.
The recommended roadmap to achieve
compliance with reporting requirements
by FY2028 was broken down into three
phases.
Phase 1: Strengthening the base
(F Y202 6)
The priority items identified for
completion in Phase 1 include the
undertaking of a materiality assessment,
development of a Greenhouse Gas
accounting framework and creation
of a central sustainability data and
evidence register, strengthening of
the governance framework for climate
oversight and climate reporting training
and capability training.
Theses priority items will require
significant effort and allocation of
resources during a period when the
Company is focused on successfully
ramping up production and managing
operational challenges.
Phase 2: Technical uplift
(FY2027)
The second phase focuses on developing
the technical analytical inputs required
for AASB reporting, but also continue to
strengthen EESG reporting alignment
with GRI / AASB. Key components of
phase 2 include:
•Climate risk and opportunity
assessments;
•Climate scenario analysis;
Phase 3: Integration & reporting
(F Y202 8)
The third phase focuses on integrating
climate and EESG considerations into
core governance, strategy and business
decision-making processes. Key
activities include:
•Integration of Climate Risk within
Enterprise Risk Management;
•Integration with Strategic and
Financial Planning;
•Preparation of AASB S2 Climate
Disclosures
Peninsula Energy Limited | Sustainability Report 20268
1 INTRODUCTION
1.4 EESG Double Materiality Assessment
During FY2026, the Company completed an EESG Double Materiality Assessment as a priority action under its sustainability
reporting roadmap. The assessment was undertaken to identify and prioritise the EESG topics most relevant to the Company’s
operations, stakeholders and long-term sustainability and included internal and external respondents.
The assessment considered materiality through two lenses: impact materiality, being the Company’s actual or potential effects on
people, the environment and the economy; and financial materiality, being the potential effect of EESG matters on enterprise value,
operational continuity, permitting, access to capital, regulatory exposure, reputation and long-term liabilities.
The assessment was informed by recognised sustainability reporting guidance, peer benchmarking and prior independent gap
analysis, including GRI, SASB Metals & Mining guidance and uranium sector reporting practices and included internal and external
stakeholders.
Table 1-3: Double materiality topic reference table
RefESG TopicTo t a lRefESG TopicTo t a lRefESG TopicTo t a l
1Radiation Protection and
Exposure Management
11.63Nuclear Industry and External
Sector Risk
11 .117 Financial Provisioning for
Closure
9.6
4Worker and Contractor
Health, Safety and Wellbeing
11.05Reputation and Stakeholder
Trust
11.018 Long-Term Environmental
Liabilities
9.5
12Emergency Preparedness and
Incident Response
10.18Access to Capital and Investor
Confidence
10.819 Environmental Monitoring,
Management and Data Integrity
9.4
2Regulatory Compliance,
Permitting and Licensing
11.36Aquifer Restoration10.920 Biodiversity and Land
Stewardship
8.7
15Cyber Security and Digital
Resilience
9.77 Deep Disposal Well
Management
10.921Long-Term Stewardship
Commitments
8.6
22Ethical Conduct, Human
Rights and Business Integrity
8.59Environmental Incident
Management
10.524Air Emissions and Atmospheric
Impacts
8.5
23 Risk Management and Internal
Controls
8.510 Groundwater Protection10.530Climate Change and Climate
Resilience
5.8
25ESG Governance and Board
Oversight
8.411Groundwater Excursion
Management
10.216Workforce Development and
Capability
9.6
27Transparency of
Environmental Performance
7.913 Water Resource Management10.126Local Economic Participation
and Community Contribution
8.4
28 ESG Disclosure, Data Quality
and Assurance Readiness
7.314Closure Planning9.729 Workforce and Board Diversity6.9
FINANCIAL MATERIALITY
IMPACT MATERIALITY
Environment &
Biodiversity
Health, Safety
& Radiation
Social &
Community
Governance &
Business Conduct
Economic &
Strategic
See accompanying topic reference table for ESG topic names and scores. Minor offsets and leader lines are used only where bubbles overlap.
HIGH IMPACT
LOW FINANCIAL
Significant impact
on people and the
environment; lower
financial impact on
the Company.
DOUBLE MATERIAL
(HIGH IMPACT &
HIGH FINANCIAL)
Critical priorities with
significant impact and
financial implications.
HIGH FINANCIAL
LOW IMPACT
Greater potential
financial impact; lower
impact on people and
the environment.
LOWER MATERIALITY
(LOW IMPACT &
LOW FINANCIAL)
Monitor and mange
through business as
usual.
Double Materiality Matrix
Bubble size reflects Combined Score (Impact + Financial Materiality)
Peninsula Energy Limited | Sustainability Report 20269
1 INTRODUCTION
The total score in the above table is the combined assessment for impact and financial materiality. Respondents were asked to rate both impact and financial materiality on a scale from 1 to 7. For purposes of the assessment, an EESG topic was considered material where its average impact or financial materiality score was 4 or higher. Topics scoring 4 or higher on both dimensions were classified as double material. The results indicate that the Company’s most significant EESG matters are closely aligned with the environmental, regulatory, health and safety, stakeholder and strategic characteristics of uranium ISR operations. The outcomes have been used to guide the scope and emphasis of this Sustainability Report, with disclosures focused on the matters most relevant to the Company’s operational and strategic context. Based on the assessment methodology, 27 of the 30 EESG topics assessed met the materiality threshold. The three topics that did not meet the threshold were Climate Change and Climate Resilience, EESG Disclosure, Data Quality and Assurance Readiness, and Workforce and Board Diversity. Although these topics scored below the defined threshold in the survey results, the Board determined that they should continue to be treated as relevant for reporting purposes. In reaching this view, the Company considered the strategic relevance of these topics, emerging stakeholder and regulatory expectations, and the potential for survey responses to reflect varying levels of support for EESG and sustainability reporting, particularly from US based respondents. The outcome of the assessment has therefore also highlighted the importance of continued internal engagement, training and awareness to support a shared understanding of the Company’s sustainability priorities. Please refer to Annexure A - Double materiality assessment results. 1.5 EESG and the uranium industry Uranium is best understood in the context of how nuclear energy works and why it remains relevant to modern electricity systems. The following section provides a brief, non-technical overview of uranium, its use in nuclear power generation and the main sustainability benefits associated with nuclear energy. Uranium and nuclear energy Uranium is a naturally occurring element found in low concentrations in rocks, soil and water. When uranium occurs in sufficient concentrations, it can be mined and processed into fuel for nuclear power plants. In simple terms, uranium is valuable because a small amount of uranium fuel can release a large amount of energy when used safely in a nuclear reactor [1]. Inside a nuclear reactor, heat is produced when uranium atoms split in a controlled process known as fission. This heat is used to make steam, which turns turbines and generates electricity. Unlike coal or gas-fired power plants, nuclear power plants do not need to burn fuel to produce this heat, which is why their direct emissions during operation are very low [1][4]. The World Nuclear Association reports that, in 2025, there were around 441 operable reactors globally with approximately 404 GWe of net generating capacity, producing
ASX ANNOUNCEMENT (ASX: PEN)
2 October 2026
ASX Listing Rule 3.13.1 Disclosure
In accordance with ASX Listing Rule 3.13.1, Peninsula Energy Limited (Peninsula or Company) advises that it is intending to hold its Annual General Meeting (AGM) on 23 November 2026.
In accordance with Peninsula’s Constitution, the closing date for receipt of nominations for persons wishing to be considered for election as a Director of the Company at the AGM is 12 October 2026.
Yours sincerely
Jonathan Whyte Company Secretary
– ENDS –
This release has been approved by Peninsula’s Managing Director.
PEL.NET.AU | 29 September 2026 ASX: PEN OTCQB: PENMF A US uranium platform with near-term operating leverage and district scale upside Mining Forum Americas | Colorado Springs George Bauk, Managing Director 1
Important Disclosures and Disclaimers
Summary
This Presentation contains summary information about the current activities of Peninsula Energy Limited (the “Company”) as at
the date of this Presentation. The information in this Presentation is of a general nature and does not purport to be complete.
This Presentation does not purport to contain all the information that an investor should consider when making an investment
decision nor does it contain all the information which would be required in a disclosure document or prospectus prepared in
accordance with the requirements of the Corporations Act 2001 (Cth). It should be read in conjunction with the Company's other
periodic and continuous disclosure announcements lodged with the Australian Securities Exchange, which are available at
https://www.asx.com.au/.
To the extent permitted by law, the Company, its representatives, affiliates, related bodies corporate, officers, employees,
agents and advisers make no representation or warranty (express or implied) as to the currency, accuracy, reliability, relevance
or completeness of the material contained in the Presentation and disclaim all responsibility and liability for the information
(including, without limitation, liability for negligence). This Presentation is not intended to form the basis of any investment
decision by a prospective investor, but simply to provide an overview to allow prospective investors to decide whether to carry
out their own independent investigations and seek their own advice before making a decision whether to invest in the Company.
In making an investment decision, investors must rely on their own examination of the Company including the merits and risks
involved and should consult with their professional advisers – whether scientific, business, financial, tax or legal.
Past performance information given in this Presentation is given for illustrative purposes only and should not be relied upon as
(and is not) an indication of future performance.
This Presentation is for information purposes only and is not a prospectus, disclosure document, product disclosure document,
product disclosure statement or other offering document under Australian law or any law (and will not be lodged with the
Australian Securities and Investments Commission). This Presentation is not and should not be considered an offer to sell or
solicitation of an offer to buy securities of the Company, and the securities of the Company may not be offered or sold in any
jurisdiction in which their offer or sale would be unlawful.
Forward Looking Statements
The Presentation contains “forward-looking statements provided by or on behalf of the Company with respect to potential future
matters. All statements other than those of historical facts included in the Presentation are forward-looking statements.
Forward-looking statements may include, but are not limited to, statements regarding the Company’s ability to fund its
operations, exploration and production targets, estimates of resources, timing of wellfield development, completion of central
processing plant and associated infrastructure commissioning activities, timing of permit and license amendments, timing of
uranium production, and rates of uranium extraction and recovery. Forward-looking statements are subject to risks,
uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or
implied by such forward-looking statements. Such risks include, but are not limited to, uranium price volatility, currency
fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, as
well as political and operational risks and governmental regulation and judicial outcomes. The Company does not undertake any
obligation to release publicly any revisions to any “forward-looking statement” to reflect events or circumstances after the date
of the Presentation, or to reflect the occurrence of unanticipated events, except as may be required under applicable laws or
regulations (including the ASX Listing Rules). All persons should consider seeking appropriate professional advice in reviewing
the Presentation and all other information with respect to the Company and evaluating the business, financial performance and
operations of the Company. Neither the provision of the Presentation nor any information contained in the Presentation or
subsequently communicated to any person in connection with the Presentation is, or should be taken as, constituting the giving
of investment advice to any person.
The Company believes it has a reasonable basis for providing the forward-looking statements and production targets included in
this Presentation.
JORC Compliance Statements
It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the
Joint Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves (“JORC Code”).
Investors outside Australia should note that while ore reserve and mineral resource estimates of the Company in this document
comply with the JORC Code (such JORC Code-compliant ore reserves and mineral resources being "Ore Reserves" and "Mineral
Resources" respectively), they may not comply with the relevant guidelines in other countries and, in particular, do not comply
with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the
"Canadian NI 43-101 Standards"); or (ii) Item 1300 of Regulation S-K, which governs disclosures of mineral reserves in
registration statements filed with the United States Securities and Exchange Commission. Information contained in this
document describing mineral deposits may not be comparable to similar information made public by companies subject to the
reporting and disclosure requirements of Canadian or US securities laws. You should not assume that quantities reported as
“resources” will be converted to reserves under the JORC Code or any other reporting regime or that Company will be able to
legally and economically extract them.
This Presentation contains references to Mineral Resource estimates and exploration targets that have been extracted from the
Company’s previous announcements. This Presentation also contains references to a production target which is based upon
certain assumptions which have been extracted from previous Company ASX announcements as indicated below. The Company
confirms that it is not aware of any new information or data that materially affects the information included in those ASX
announcements, and in the case of estimates of Mineral Resources, that all material assumptions and technical parameters
underpinning the estimates in the relevant ASX announcements continue to apply and have not materially changed.
The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been
materially modified from the original market announcements.
Mineral Resources
The detailed assumptions regarding the Company’s JORC compliant Mineral Resource estimates are disclosed in the
Company’s ASX announcements released on 25 September 2026 and 23 October 2023.
Exploration Target
Information regarding the Company’s exploration target is disclosed in the Appendix 2 of the Company’s Presentation released
to the ASX on 9 October 2023. The exploration target does not include areas of the existing Mineral Resource and the potential
quantity and grade reported are conceptual only in nature. Insufficient exploration has been conducted to estimate a Mineral
Resource and it is uncertain whether future exploration will lead to the estimation of a Mineral Resource in the defined areas.
2
Important Disclosures and Disclaimers Production Target The production guidance is based on the material assumptions set out in the Company’s ASX announcements relating to previous production targets, released 22 August 2025, 13 May 2024 and 31 August 2023. Peninsula confirms that it is not aware of any new information or data that materially affects the information included in this announcement and that all material assumptions and technical parameters underpinning the production target continue to apply and have not materially changed. Whilst the Company considers that all material assumptions underpinning the projected production and cash flows in this Presentation are based on reasonable grounds, there is no certainty that they will prove to be correct or that the outcomes indicated will be achieved. There is a low level of geological confidence associated with Inferred mineral resources and there is no certainty that further exploration and delineation work will result in the determination of Indicated mineral resources or that the production target itself will be realized. Financial information contained in this announcement is preliminary in nature and is in-part based on low- level technical and economic assessments and is insufficient to support the estimation of reserves or to provide assurance of economic development. In accordance with the relevant regulations governing the disclosure of mineral projects, readers are cautioned that mineable resources based on Inferred Resource material are considered too speculative geologically to enable them to be classified as reserves. Given the uncertainties involved, investors should not make any investment decision based solely on this Presentation. Disclaimers The totals in tables may not add due to rounding. The distribution of this Presentation in jurisdictions outside Australia may be restricted by law and any such restrictions should be observed. In particular, this Presentation may not be distributed or released in the United States. Any failure to comply with such restrictions may constitute a violation of applicable securities laws. This Presentation does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States of America or in any other jurisdiction in which such an offer would be illegal. The offer and sale of the entitlements and New Shares referred to in this Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 (“Securities Act”) and the entitlements may not be taken up by, and the New Shares may not be offered or sold to, any person in the United States of America unless the securities have been registered under the Securities Act (which Peninsula has no obligation to do or procure) or are taken up, offered or sold in a transaction exempt from, or not subject to, the registration requirements of the Securities Act and any other applicable securities laws. Third party information This Presentation contains data and information sourced from independent third parties and government sources, and the Company makes no representation, whether express or implied, as to the accuracy of such data or information. Competent Person Statement The information in this Presentation that specifically relates to Exploration Targets, Exploration Results, Exploration Potential, Mineral Resources or Ore Reserves at the Lance Projects is based on information compiled by Mr Christopher McDowell. Mr McDowell is a Registered Member of the Society for Mining, Metallurgy & Exploration (Member No. 4311521). Mr McDowell is a Professional Geologist in the State of Wyoming and is employed by independent consultant Western Water Consultants, Inc. d/b/a WWC Engineering. Mr McDowell has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr McDowell consents to the inclusion in the Presentation of the matters based on his information in the form and context in which it appears.
This Presentation was approved by the Board of Peninsula Energy Limited 3
Investment Highlights A constructed US uranium platform moving from commissioning complexity toward repeatable wellfield performance 59Mlbs Lance JORC 2012 Mineral Resource 2.0Mlbs p.a. Installed CPP nameplate capacity 0.6Mlbs in Contracts Strengthened technical expertise through recent CTO appointment, Technical Committee and consultants A growing list of initiatives to improve cost profile including First Owner-Operator Drill Rig 4 1 - Please refer to ASX announcement 25 September 2026: “Mineral Resource Increases to 59.0Mlbs U 3 O 8 at the Lance Project”. Significant Exploration Upside Spot Price Climbing Stronger Long-Term Pricing Growing Demand (USA) 4
5 Corporate Overview 1 Market Cap 2 US$104M (A$149M) Cash 3 US$22.1M At 30 June, excluding US$30m drawdown in July Share Price 2 US$0.18 (A$0.26) Debt 4 US$30.0M Note (1)
Corporate information as at28 September 2026 Note (2) Exchange Rate AUD:USD 0.70 Note (3) Cash at 30 June 2026 – prior to drawdown of US$30m Soul Patts convertible note in July 2026 Note (4) Debt at 28 September 2026 Note (5) 12.07m warrants only exercisable if PEN enters administration Security code & description Securities on Issue PEN: Ordinary Shares571,527,409 PENAAC: Options (Expiring 01-Oct-2028 / Ex $0.45) 4,043,467 PENAAD: Options (Expiring 01-Oct-2028 / Ex $0.60) 4,043,467 PENAAF: Warrants 5 (Expiring 30-Sep-2030 / Ex $0.43) 24,148,664 PENAV: Options (Expiring 26-Nov-2027 / Ex $6.00) 205,000 PENAZ: Service Rights2,715,608 PENAB: Performance Rights11,840,037 PENAAE: Convertible Notes Convertible into ordinary shares of US$30M
at A$0.35 per share 0.0 M 5.0 M 10.0 M 15.0 M 20.0 M 25.0 M 30.0 M 35.0 M $0.00 $0.20 $0.40 $0.60 $0.80 $1.00 $1.20 Sep-25Oct-25Nov-25Dec-25Jan-26Feb-26Mar-26Apr-26May-26Jun-26Jul-26Aug-26 Volume (million) Share Price (A$) VolumeShare Price
6
Refreshed Board and Executive Leadership
Mr George Bauk
Managing Director / CEO
Mr Bauk has over 30 years of global
experience in uranium, rare earths, gold,
lithium, and graphite. He has led companies
and major projects from exploration to
production, raising over A$920m in his career.
Mr David Coyne
Non-Executive Chairman
Mr Coyne has over 30 years of global
experience in mining, oil & gas, and
construction. A CPA, he has held senior roles
in listed and private companies, including
former Finance Director with Spartan
Resources.
Mr Keith Bowes
Non-Executive Director
Mr Bowes, BSc (Chemical Engineering) and AICD
graduate. 30 years’ experience in metallurgy,
mining, project development and governance,
including global roles with Anglo American and
BHP. He was most recently MD of Lotus
Resources, leading the Kayelekera development.
Ms Tejal Magan
Non-Executive Director
Ms Magan, a Chartered Accountant with 15+
years’ experience in capital markets, M&A,
governance, and compliance, was until
recently CFO and Joint Company Secretary of
Spartan. She played a key role in Spartan’s
successful $2.4B merger with Ramelius.
Mr Brian Booth
Non-Executive Director
Mr Booth is an experienced mining
executive, who brings over 35 years of
experience across the mineral exploration
and mining sectors with major and junior
mining companies.
Mr Jitu Bhudia
Chief Financial Officer
Mr Bhudia is a Chartered Accountant and a
seasoned CFO with over 25 years of
experience in ASX-listed companies,
bringing extensive expertise in capital
management, debt and equity financing
and corporate governance.
Mr Willie Bezuidenhout
VP Corporate Development
MrBezuidenhout is an accomplished
Chartered Accountant with a strong
strategic focus having previously held
the position of Interim CFO at
Peninsula Energy.
Mr Jonathan Whyte
Company Secretary
Mr Whyte is a Chartered Accountant
and has extensive corporate, company
secretarial and financial accounting
experience across a number of listed
and unlisted resource sector
companies.
Site Leadership Team – Deep In-Country ISR Experience
7
Mr Ralph Knode
CEO – Strata Energy Inc
Mr Knode has over 40 years of experience in uranium exploration, evaluation,
construction, and operations across North America, Kazakhstan, and
Australia. Mr Knode held senior roles at Uranium One and Cameco
subsidiaries and has been directly involved in launching or operating five In
Situ Recovery projects on three continents.
Mr Brian Pile
Interim SVP Operations and Development
Mr Pile has over 25 years of professional experience, having worked directly on
ISR projects in US states Nebraska and Wyoming, and in Kazakhstan (JV Inkai).
As a consultant prior to joining Strata/Peninsula, Mr Pile worked on mining,
water treatment, and environmental projects throughout western US. Mr Pile
has worked directly on constructing and commissioning five major ISR
projects.
Mr Ken Milmine
VP OH&S, Approvals
Mr Milmine has almost 30 years of regulatory, environmental, health and safety
experience in the mining industry including gold, molybdenum, coal, and uranium
extraction in Idaho and Wyoming. Mr Milmine has managed uranium specific
health, safety, and environmental regulatory programmes through his previous
experience with Cameco, Energy Metals, and Uranium One. Mr Milmine joined
Strata in August of 2021.
Mr Jeramy Spicer
Production Manager
Mr Spicer has over 30 years of production and management experience in
multiple chemical industries including sodium percarbonate, lactic acid, and
soda ash. Mr Spicer’s experience also includes production planning,
optimisation along with budget development and tracking.
Mr Gary Birch
Chief Technical Officer
Mr Birch is a highly experienced low-pH ISR uranium executive with more than 20
years of operational experience at Heathgate’s Beverley and Four Mile mines. He
brings deep expertise in wellfield performance, engineering, maintenance and
operational leadership to support Lance’s production growth.
Mr Jesse Self
Geology Manager
Mr Self has over 13 years of uranium-specific geology experience in Wyoming,
having worked as a geologist for both Ur-Energy Inc. and Strata. Mr Self’s ISR-
specific experience includes geology management services from development and
delineation drilling to wellfield design and construction, drilling supervisor,
wellfield operations, geophysical logging, and reclamation.
8 Wyoming, USA Lance Project Central Processing Plant, constructed for 2Mlbs U 3 O 8 p.a. and fully licensed for production up to 3Mlbs U 3 O 8 p.a. The Top Uranium Jurisdiction in the USA LANCE IS STRATEGICALLY POSITIONED TO BECOME A CORNERSTONE URANIUM PRODUCER TO CLOSE THE URANIUM SUPPLY GAP NOT FOR RELEASE OR DISTRIBUTION IN THE UNITED STATES
Production Status 9
HH-14 & HH-16 were the first HHs in MU-4 to start-up HH-15 & HH-17 are in start-up phase now (HH-15 – production commenced, HH-17 – acidification commenced) HH-18 & HH-19 are in construction phase 8 DescriptionDAF (Dissolved Air Flotation) Injection Filtration Co-MinglingPeroxide Addition During Soft Acidification 3 Calcite Dissolution Control Measures HH-14NoYes 1 Yes 2 AcidificationNoNo HH-15YesYesNoProductionNoNo HH-16NoYes 1 Yes 2 AcidificationNoNo HH-17YesYesNoProductionYesNo HH-18YesYesNoProductionYesYes 4 HH-19YesYesNoProductionYesYes 4 1 were installed, but did not function correctly 2 HH-14 & HH-16 lixiviants were mixed (co-mingled) at different stages of acidification (i.e. pH levels) resulting in precipitation and flow issues 3 starting with low acid tenor and building up for calcite dissolution control measures 4 the option to remove calcium via soda ash precipitation as part of the DAF process is being considered WELLFIELD OPERATIONS Header House Operating Condition Summary 10
Off-take Position 11 Highly leveraged to spot uranium prices with minimal contracted pounds One contract in place for 600,000lbs 1
•100,000lbs per annum 2028 – 2033 (post ramp-up) •Blend of base price (escalated) plus market price •Take or pay commitments remain in place Note (1) The figure of 600,000lbs represents a contractual offtake obligation under an existing agreement and is not a production target, forecast, or guidance. It does not represent a statement as to future production and should not be construed as such. Actual production may differ materially from the contracted quantity.
Future Growth 12
Largest known ISR project in Wyoming, USA – 59Mlbs Exploration Target of 104 – 163 Mlbs U 3 O 8 based on a combination of past exploration results and proposed exploration programmes 2 Lance – Already Very Large, But Still Lots of Potential to Grow 13 Permit Area Tonnage (Mt) Grade (ppm U 3 O 8 ) U 3 O 8 m il l io n lbs Ross Measured1.95202.2 Indicated3.74503.7 Inferred1.74001.5 Total 7.3460 7.4 Kendrick Measured1.25401.4 Indicated5.45806.9 Inferred10.251011.5 Total 16.8540 19.8 Barber Measured0.74800.7 Indicated2.54302.4 Inferred26.649028.7 Total 29.8480 31.9 Total Measured3.85204.3 Indicated11.751012.9 Inferred38.549041.7 Total Lance53.950059.0 Note (1) JORC table included in an announcement to the ASX released on 25 September 2026: “Mineral Resource Increases to 59.0Mlbs U3O8 at the Lance Project”. Peninsula confirms that it is not aware of any new information or data that materially affects the information included in this announcement and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement. Note (2) Please note that in accordance with Clause 17 of the JORC (2012) Code, the potential quantity and grade of the ”Exploration Target” in this presentation must be considered conceptual in nature as there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. Refer Appendix 2. Refer to Appendix 3 for mineral resource and grade details of deposits referenced in diagram above
Kendrick is the next sequential production area following production at the Ross Area Project area is fully permitted to commence mining operations, with all approvals received from Wyoming Department of Environmental Quality (WDEQ) and EPA Project area spans approximately 7,992 acres Next Steps •Development of MU-5 •Further delineation and exploration drilling – beyond MU-5 •Workstreams will feed into updated production guidance from 2028 Kendrick Development Project 14 Please refer to ASX Announcement 25 September 2026: “Mineral Resource Increases to 59.0Mlbs U3O8 at the Lance Project” Peninsula confirms that it is not aware of any information or data that materially affects the information included in these announcements and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements. Classification Tonnes (Mtonnes) Average Grade (ppm) U 3 O 8 Metal (Mlbs) Measured1.25401.4 Indicated5.45806.9 Inferred10.251011.5 Total16.853019.8
Kendrick •Fully-permitted •Development underway – 2026 •Optimisation studies to be reviewed •Plan to convert resources from inferred to indicated Barber •Large, under-delineated inferred resource •Plan to convert resources from inferred to indicated •Potential future satellite operation Dagger •Higher-grade resource (6.9Mlbs @ 1,037ppm) •Satellite ISR opportunity •Further exploration •Scoping Study underway These projects provide long-term growth optionality Regional and Satellite Growth Pipeline 15 Kendrick Development Area The next sequential production area, with an estimated resource of 19.8Mlbs U 3 O 8 – Permit to Mine and Source Materials Licence in place. Barber Exploration Project Significant upside in production growth and life of mine extension adjacent to Lance, with an estimated Resource of 31.9Mlbs 1 U 3 O 8 . Please refer to ASX Announcement 25 September 2026: “Mineral Resource Increases to 59.0Mlbs U3O8 at the Lance Project”
The Strategic Context 16
The uranium market is entering a structurally undersupplied phase, requiring new primary production Demand Growth •Global uranium demand forecast to increase materially to 2040 •Nuclear increasingly recognized as critical for: •Energy Security •Decarbonisation •AI / data center power demand Supply Constraints •Limited new projects coming into production •Long lead times (10-15 years) •Declining secondary supply Market Implications •Structural supply deficit expected to widen •Incentivising new primary production and restarts Uranium Demand Growth Outpacing Supply 17 The US operates 94 nuclear reactors across 54 plants, generating about 20% of the nation’s electricity
Positioned to be a Meaningful USA Uranium Supplier 18 US Demand CY 2024 US Production CY 2025 2.2Mlbs56Mlbs Mlbs per year vs. Existing production platform •Fully permitted ISR operation in Wyoming •CPP constructed and largely commissioned •Production already underway Scalable growth •Clear pathway •CY2027 0.5 – 0.6Mlbs p.a. Leverage to market •Uncontracted production (exposure to pricing) •Positioned to benefit from rising US demand Strategic location •US jurisdiction •Existing infrastructure + resource base Peninsula offers a rare opportunity to invest in a near- term, scalable US uranium producer Source: U.S. Energy Information Administration, “Uranium Marketing Annual Report” released September 30, 2025 and “Domestic Uranium Production Report Fourth-Quarter 2025” released March 2026
Summary 19
Peninsula is moving from commissioning complexity toward repeatable wellfield performance supported by a constructed US production platform, a large resource base, and a disciplined approach to growth 20
ASX: PEN OTCQB: PENMF 21
Appendix 2A - Application for quotation of securities 1 / 6 Announcement Summary Entity name PENINSULA ENERGY LIMITED Announcement Type New announcement Date of this announcement Wednesday September 30, 2026 The +securities to be quoted are: Total number of +securities to be quoted ASX +security codeSecurity description Number of +securities to be quotedIssue date PENORDINARY FULLY PAID37,94430/09/2026 Refer to next page for full details of the announcement +Securities issued, transferred or re-classified as a result of options being exercised or other +convertible securities being converted
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 2 / 6 Part 1 - Entity and announcement details 1.1 Name of entity PENINSULA ENERGY LIMITED We (the entity named above) apply for +quotation of the following +securities and agree to the matters set out in Appendix 2A of the ASX Listing Rules. 1.2 Registered number type ABN Registration number 67062409303 1.3 ASX issuer code PEN 1.4 The announcement is 1.5 Date of this announcement 30/9/2026 New announcement
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 3 / 6 Part 2 - Type of Issue 2.1 The +securities to be quoted are: 2.2 The +class of +securities to be quoted is: Additional +securities in a class that is already quoted on ASX ("existing class") +Securities issued, transferred or re-classified as a result of options being exercised or other +convertible securities being converted
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 4 / 6 Part 3B - number and type of +securities to be quoted (existing class) where issue has not previously been notified to ASX in an Appendix 3B Existing +securities converting into additional +securities in an existing class FROM (Existing Class) ASX +security code and description PENAZ : SERVICE RIGHTS TO (Existing Class) ASX +security code and description PEN : ORDINARY FULLY PAID Please state the number of options that were exercised or other +convertible securities that were converted 37,944 The first date the options were exercised or other +convertible securities were converted 30/9/2026 The last date the options were exercised or other +convertible securities were converted 30/9/2026 Is this all of the options or other +convertible securities on issue of that type (ie have all of those options now been exercised or have all of those convertible securities now been converted)? The right of the holder of the options or other +convertible securities to receive the +underlying securities is being satisfied by: The underlying +securities being received by the holder are: Were the options being exercised or other +convertible securities being converted issued under an +employee incentive scheme? Issue date 30/9/2026 Will the +securities to be quoted rank equally in all respects from their issue date with the existing issued +securities in that class? Yes No Intended to be, but are not yet, quoted by ASX An issue of new +securities No
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 5 / 6 Issue details Number of +securities to be quoted 37,944 Are the +securities being issued for a cash consideration? Please describe the consideration being provided for the +securities The securities are being issued on the conversion of existing service rights that have vested. Please provide an estimate (in AUD) of the value of the consideration being provided per +security for the +securities to be quoted 0.250000 Any other information the entity wishes to provide about the +securities to be quoted NoNo
Appendix 2A - Application for quotation of securities Appendix 2A - Application for quotation of securities 6 / 6 Part 4 - Issued capital following quotation Following the quotation of the +securities the subject of this application, the issued capital of the entity will comprise: The figures in parts 4.1 and 4.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing. 4.1 Quoted +securities (total number of each +class of +securities quoted on ASX following the +quotation of the +securities subject of this application) ASX +security code and description Total number of +securities on issue PEN : ORDINARY FULLY PAID571,565,353 4.2 Unquoted +securities (total number of each +class of +securities issued but not quoted on ASX) ASX +security code and description Total number of +securities on issue PENAAC : OPTION EXPIRING 01-OCT-2028 EX $0.454,043,467 PENAAD : OPTION EXPIRING 01-OCT-2028 EX $0.604,043,467 PENAAF : WARRANTS EXPIRING 30-SEP-2030 EX $0.4524,148,664 PENAC : WARRANTS10,786,125 PENAV : OPTION EXPIRING 26-NOV-2027 EX $6.00205,000 PENAZ : SERVICE RIGHTS2,677,664 PENAB : PERFORMANCE RIGHTS11,840,037 PENAD : CONVERTIBLE NOTES1
ASX ANNOUNCEMENT (ASX: PEN)
30 September 2026
Notice under Section 708A
Peninsula Energy Limited (“Peninsula” or “the Company”) (ASX: PEN, OTCQB: PENMF) advises that an Appendix 2A was released today for the issue of a total of 37,944 fully paid ordinary shares on conversion of existing service rights that have vested (“The Securities”).
The Company gives notice pursuant to section 708A (5)(e) of the Corporations Act 2001 (Cth) (“Corporations Act”) that:
(a) The Securities were issued without disclosure under Part 6D.. 2 of the Corporations Act.
(b) The Company, as at the date of this notice, has complied with the provisions of Chapter 2M of the Corporations Act and sections 674 and 674A of the Corporations Act.
(c) There is no excluded information to be disclosed for the purposes of section 708A (7) and (8) of the Corporations Act.
Yours sincerely
Jonathan Whyte Company Secretary
– ENDS –
This release has been approved by Peninsula’s Managing Director.
ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2026
Peninsula Energy Limited 1 2026 Annual Report Contents Chair Letter ............................................................................................................................. 2 Corporate Governance Statement ........................................................................................... 4 Directors’ Report ..................................................................................................................... 8 Remuneration Report – Audited ............................................................................................ 26 Auditor’s Independence Declaration ..................................................................................... 41 Consolidated Statement of Profit or Loss and Other Comprehensive Income ......................... 42 Consolidated Statement of Financial Position ....................................................................... 43 Consolidated Statement of Changes in Equity ....................................................................... 44 Consolidated Statement of Cash Flows .................................................................................. 45 Notes to the Consolidated Financial Statements ................................................................... 46 Consolidated Entity Disclosure Statement ............................................................................. 94 Directors’ Declaration ........................................................................................................... 95 Independent Auditor’s Report ............................................................................................... 96 ASX Additional Information ................................................................................................ 100 Corporate Directory ............................................................................................................ 103
Peninsula Energy Limited 2 2026 Annual Report Chair Letter
Dear fellow Shareholders,
This is my second letter to you as Chair of the Peninsula Energy Board, following my appointment to that role on a permanent basis in August 2025.
Like the 2025 financial year, FY2026 has presented a number of challenges for the Company as we finalised construction of the expanded functionality and capacity of the Central Processing Plant at the Lance Project and continued ongoing wellfield development, operations and maintenance. As I look back on the past 12 months, I feel it has been a period of significant learning for Peninsula as a whole, and especially for our site leadership and operating teams.
Importantly, FY2026 also marked several significant milestones for the Company. We completed the substantial capital works associated with the Central Processing Plant expansion, advanced Mine Unit 4 development and commenced operations in this new low-pH mine unit at Lance. The uranium grades achieved from these wellfields to date have been highly encouraging and materially stronger than those achieved during prior alkaline operations, reinforcing our confidence in the underlying quality of the resource and the long-term value potential of the Lance Project.
As part of the finalisation of the financial statements, the Company has recognised a non-cash impairment principally relating to legacy wellfield development assets associated with Mine Units 1, 2 and 3, together with certain historically capitalised costs. This accounting expense reflects our decision to focus future technical, operational and capital resources on Mine Unit 4 and future mine development and does not alter the Board's confidence in the long-term value and potential of the broader Lance Project.
Bringing the Lance Project back into production required us to change from an alkaline leach basis to a low-pH (mildly acidic) leach basis. While the use of the low-pH leach basis at uranium in-situ recovery operations is commonplace around the world, this is the first time it has been applied at a uranium mine in the United States for several decades. While the Company was able to undertake a range of positive laboratory tests and small-scale field trials using the low-pH basis prior to commencing development, the past year has shown us that we still have a lot to learn about how to most effectively develop, operate and maintain the wellfields at Lance.
Material progress was made with the development of Mine Unit 4 during the year, and we commenced acidification of the first header house (Header House 14) in this mine unit in late December 2025. Encouragingly, flowrates during the initial acidification period were stronger than what was seen from the header houses in Mine Unit 3. However, as acidification progressed, the combination of injecting both sulphuric acid and hydrogen peroxide from the commencement of acidification appeared to cause a buildup of gas in the mining formation, as well as the precipitation of solids, leading to a drop-off in flowrates and increased wellfield maintenance requirements.
As we have adopted the learnings from acidifying and operating Header House 14 and Header House 16 – the second header house to be commissioned in Mine Unit 4 – the site team has modified acidification phase operating procedures and wellfield maintenance practices for subsequent header houses, which we expect will have a positive impact on maintaining flow rates in new header houses. Due to the nature of in- situ recovery mining, our ability to see the results of these changes is measured in months, not in days or weeks.
While maintaining flowrates has so far proven challenging, the early uranium head grades that we have seen across extraction wells in Header Houses 14 and 16 have certainly been very encouraging, and significantly better than what was achieved during the unsuccessful alkaline-based operations. As a reminder, production at the Lance Project was paused after three years of operations due to lower-than- anticipated uranium head grades from the wellfields, not due to insufficient wellfield flowrates. In fact, flow rates in the original alkaline wellfields in Mine Units 1 and 2 were generally consistent with expectations.
I expect that most, if not all, of our shareholders will be disappointed and frustrated with the production performance over the past year. The Peninsula Board, executive leadership team and site personnel all share this frustration. Our team – supported by recently bolstered specialist technical resources – is working
Peninsula Energy Limited 3 2026 Annual Report extremely hard to better understand the most effective wellfield chemistry mix that will achieve targeted uranium head grades without impeding wellfield flow rates.
We feel confident we are on the right track to overcoming the wellfield challenges experienced to date and unlocking the potential value we believe is inherent in the Lance Project.
As we continue these actions, we do so against the backdrop of an ever-improving market for nuclear power generation globally and for uranium, the predominant fuel used by global nuclear power generators. The past year has seen the base price for uranium to be delivered under long-term contracts exceed US$90/lb U 3 O 8 and continue its march beyond US$100/lb U 3 O 8 . A range of nations across the globe are actively pursuing the development of new carbon-friendly nuclear power generation facilities, either through traditional large-scale plants or through newer technologies such as small modular reactors.
Growth in nuclear power supports increased demand for uranium at a time when new uranium supply is taking longer to develop and some existing Tier-1 uranium mines are moving toward the end of their life- cycle. Our goal remains to be a long-term and reliable supplier of uranium into this improving market. Resolving our wellfield challenges as quickly as possible is an imperative value-driver for the Company and our shareholders, as I firmly believe that resource companies that are in production during the period of a positive cycle for their commodity typically deliver the best value for their shareholders.
Looking ahead, I am excited and optimistic about the opportunities that lie ahead for the Company. Over the past 1 to 2 years, we have established the infrastructure, assembled the team and gained valuable operational experience that will support future improvements in wellfield performance. While challenges remain, the encouraging uranium grades, ongoing operational refinements and supportive uranium market fundamentals give me confidence that Peninsula is moving in the right direction. Our focus remains firmly on translating this progress into sustainable production and delivering long-term value for our shareholders.
Once again, I would like to thank our shareholders for their ongoing support of the Company and our employees. Restarting projects is not easy – I think that is evident from has transpired for a range of companies in a range of commodities over the past 12 to 24 months. Even though we have faced our share of challenges, our team is working methodically and diligently to develop solutions to these challenges and, on behalf of my fellow Directors I would like to thank them for their ongoing hard work and commitment to the Lance Project and the Company.
Yours faithfully,
David Coyne
Non -Executive Chair
29 September 2026
Peninsula Energy Limited 4 2026 Annual Report
Corporate Governance Statement
Unless disclosed below, all the best practice recommendations of the 4th edition of the ASX Corporate
Governance Council have been applied for the entire financial year ended 30 June 2026.
Board Composition
The skills, experience, and expertise relevant to the position of each Director who is in office at the date of
the annual report and their term of office are detailed in the Directors’ Report.
The names of the Directors of the Company, or who have served as a Director during the year, are:
• David Coyne Non-Executive Chair (Independent)
• George Bauk Managing Director / Chief Executive Officer
• Brian Booth Non-Executive Director (Independent)
• Keith Bowes Non-Executive Director (Independent) (appointed 12 August 2025)
• Tejal Magan Non-Executive Director (Independent) (appointed 15 September 2025)
• Harrison Barker Non-Executive Director (Independent) (resigned 29 July 2025)
• Mark Wheatley Non-Executive Director (Independent) (resigned 29 July 2025)
The Board considers that an Independent Director is a Non-Executive Director who also:
• Is not a substantial shareholder of the Company or an officer of, or otherwise associated directly
with or nominated by, a substantial shareholder of the Company;
• Within the last three years has not been employed in an executive capacity by the Company or
another group member or been a director after ceasing to hold any such employment;
• Within the last three years has not been a principal of a material professional adviser or a material
consultant to the Company or another group member, or an employee materially associated with
the service provider;
• Is not a material supplier or customer of the Company or other group member, or an officer of or
otherwise associated directly or indirectly with a material supplier or customer;
• Has no material contractual relationship with the Company or another group member other than as
a director of the Company;
• Has not served on the Board for a period that could, or could reasonably be perceived to, materially
interfere with the director’s ability to act in the best interests of the Company; and
• Is free from any interest and any business or other relationship that could, or could reasonably be
perceived to, materially interfere with the director’s ability to act in the best interests of the Company.
Non-Executive Directors have the right to seek independent professional advice in the furtherance of their
duties as Directors at the Company’s expense. Written approval must be obtained from the Chair prior to
incurring any expense on behalf of the Company.
Ethical Standards
The Board acknowledges and emphasizes the importance of all Directors and employees maintaining the
highest standards of corporate governance practice and ethical conduct.
A Code of Conduct has been established requiring Directors and employees to:
• Act honestly and in good faith;
• Exercise due care and diligence in fulfilling the functions of office;
• Avoid conflicts and make full disclosure of any possible conflict of interest;
• Comply with the law; and
• Encourage the reporting and investigating of unlawful and unethical behaviour.
Peninsula Energy Limited 5 2026 Annual Report
Directors are obliged to be independent in judgment and ensure all reasonable steps are taken to ensure
due care is taken by the Board in making sound decisions.
Diversity
The Board has adopted a Diversity Policy as per the recommendations. The Diversity Policy addresses
equal opportunities in the hiring, training, and career advancement of directors, officers, and employees.
The Diversity Policy outlines the processes by which the Board will set measurable objectives to achieve
the aims of its Diversity Policy, with focus on gender diversity within the Company.
The Company is committed to inclusion at all levels of the organisation, regardless of gender, marital or
family status, sexual orientation, gender identity, age, disabilities, ethnicity, religious beliefs, cultural
background, socio-economic background, perspective and experience.
The Board is responsible for monitoring Company performance in meeting the Diversity Policy
requirements, including the achievement of diversity objectives if and when such objectives are set. The
Company is focused on providing a range of business and employment opportunities for all members of
the communities in which it operates in.
Gender Diversity
The Board is committed to workplace diversity and supports representation of women at the senior level of
the Company and on the Board. As the Company has recently been commissioning newly constructed
processing facilities and ramping-up wellfield production at the Lance Project, and given the size of the
Company, the Board has not set gender diversity objectives. As the Company works through production
ramp-up challenges at the Lance Project over the next year or so, the Board will evaluate whether the
setting of meaningful gender diversity objectives are appropriate for the Company.
The Company considers the current Board with one female and four male Board members to be effective
and possessing a wide range of complementary skills. All Board appointment processes are conducted in
a manner that promotes gender diversity, including establishing a structured approach for identifying a pool
of candidates, using external experts where necessary.
Women Employees, Executives and Board Members
The Company has one female Board member.
As at 30 June 2026, the Company and its consolidated entities had nine (2025: seven) female
employees:
• a geologist,
• an accounts payable clerk,
• a land/payroll manager,
• a procurement & inventory manager,
• a manager of human resources,
• a manager of accounting,
• a business service specialist,
• a lead shift operator,
• a construction & maintenance technician.
Female employees represent approximately 13% (2025: 11%) of the total employees of the Group.
Peninsula Energy Limited 6 2026 Annual Report
Description Male % Female %
30 June 2026
Board of Directors 3 75.0% 1 25.0%
Senior management 8 100.0% 0 0.0%
Other employees 56 86.1% 9 13.9%
Total 67 87.0% 10 13.0%
30 June 2025
Board of Directors 5 100.0% 0 0.0%
Senior management 9 100.0% 0 0.0%
Other employees 42 85.7% 7 14.3%
Total 56 88.9% 7 11.1%
Trading Policy
The Board has formally adopted a Securities Trading Policy in line with Corporate Governance guidelines
which restricts Key Management Personnel from acting on material information until it has been released
to the market and adequate time has been given for this to be reflected in the security’s prices. Key
Management Personnel are those persons having authority and responsibility for planning, directing and
controlling the activities of the Company and/or subsidiaries of the Company, directly or indirectly, including
any Director (whether executive or otherwise) of the Company and/or a subsidiary of the Company.
Whistleblower and Anti-Bribery and Corruption Policy
The Board has in place Whistleblower, Anti-Bribery and Corruption Policies in line with recommendations
of the 4th edition of the ASX Corporate Governance Council. The Board generally reviews the policies on
an annual basis, and no changes were made to any of these policies during the year.
Audit, Risk and Sustainability Committee
During the year the Audit, Risk and Sustainability Committee consisted of three Non-Executive Directors
throughout the majority of the year and had an independent Chairperson. The number of directors on the
Committee during the year is consistent with the ASX Corporate Governance Council recommendations
and is appropriate for the size of the Company. The Chief Financial Officer and Company Secretary are
also present at all Audit, Risk and Sustainability Committee meetings. The Audit, Risk and Sustainability
Committee operates under a Board approved charter.
In addition to assisting the Board with its oversight of audit and risk matters, the purpose of the Committee
is to now also assist the Board in fulfilling its oversight responsibilities in relation to the Company's
sustainability-related matters. Key aspects of the Audit, Risk and Sustainability Committee’s responsibility
include matters related to its employees, governance, health and safety, environmental stewardship,
community engagement and sustainability reporting.
The names and qualifications of those appointed to the Audit, Risk and Sustainability Committee are
included in the Directors’ Report, together with their attendance at meetings held during the year.
Shareholder Rights
Shareholders are entitled to vote on significant matters impacting on the business, which include the
election and remuneration of Directors, changes to the constitution and receipt of annual and interim
financial statements. Shareholders are strongly encouraged to attend and participate in the Annual General
Meetings of Peninsula Energy Limited, to lodge questions to be responded to by the Board and/or the CEO
and can appoint proxies.
Risk Management
The Board considers identification and management of key risks associated with the business as vital to
maximise shareholder wealth. The Chief Financial Officer has been delegated the task of implementing
internal controls to identify and manage risks for which the Board provides oversight. The effectiveness of
Peninsula Energy Limited 7 2026 Annual Report
these controls is monitored and reviewed as required. The volatile economic environment has emphasised
the importance of managing and reassessing the Company’s key business, social and environmental risks.
Remuneration Policies
The Remuneration Committee is responsible for determining and reviewing the appropriate compensation
arrangements and policies for Key Management Personnel, in accordance with the policies and procedures
outlined in the Remuneration Committee Charter. The Remuneration Committee reviews executive
packages annually by reference to Company performance, executive performance, comparable information
from industry sectors and other listed companies.
The Company’s Remuneration Policy is to ensure remuneration packages properly reflect each person’s
duties and responsibilities and support the Company’s business objectives. The Policy is designed to attract
the highest calibre directors, executives, and senior staff, and is intended to reward them for performance
which results in long-term growth in shareholder value.
Executives and selected senior staff are also entitled to participate in the employee share, restricted share
units, performance rights, service rights and option arrangements.
The amount of remuneration for all Key Management Personnel of the consolidated group, including all
monetary and non-monetary components, is detailed in the Remuneration Report within the Directors’
Report. Shares awarded to Key Management Personnel are valued at the market price of those shares.
Rights and Options are valued independently using either the Hoadley Trading and Investment Tools
(‘Hoadley’) ESO2 valuation model or where appropriate the Black-Scholes model.
The Board believes that the remuneration structure adopted results in the Company being able to attract
and retain the best directors, executives, and senior staff required to run the consolidated group. It is also
intended to provide executives with the necessary incentives to achieve and exceed targets and grow long-
term shareholder value.
The payment of cash bonuses, security awards and other incentive payments is reviewed by the
Remuneration Committee annually as part of the review of executive remuneration and a recommendation
is put to the Board for approval. All cash bonuses, security awards and other incentives are ordinarily linked
to predetermined performance criteria. The Board can exercise its discretion in relation to approving
incentives, cash bonuses and share-based awards, and can recommend changes to the Remuneration
Committee’s recommendations. Any changes must be justified by reference to either measurable
performance criteria or other relevant circumstances applicable to the Company.
Remuneration Committee
The Remuneration Committee currently comprises three Non-Executive Directors and has an independent
Chairperson, consistent with the ASX Corporate Governance Council recommendations.
The names of the members of the Remuneration Committee and their attendance at meetings of the
Committee are detailed in the Directors’ Report.
Nomination Committee (disbanded)
The Nomination Committee previously comprised three Non-Executive Directors. Given the size of the
Company and the Board renewal process completed between November 2024 and September 2025, the
Board has disbanded the Nomination Committee with this function now undertaken by the full Board.
The Company has a procedure guideline for the selection and appointment of Directors. New candidates
are considered with reference to a number of factors which include, but are not limited to, their relevant
experience, expertise and professional qualifications, compatibility with the existing Board and possession
of complimentary skill sets, absence of conflicts of interest or other legal impediments to serving on the
Board, credibility within the Company’s industry and scope of activities and their overall integrity and
reputation.
The Company has in place appropriate procedures to ensure that material information relevant to a decision
to re-elect a Director is disclosed in the notice of meeting provided to security holders.
Other Information
Further information relating to the Company’s corporate governance practices and policies has been made
available publicly on the Company’s website at www.pel.net.au.
Peninsula Energy Limited 8 2026 Annual Report
Directors’ Report
Your Directors present their report, together with the financial statements of the “consolidated group” (or
“Peninsula”), being the Company and its controlled entities, for the financial year ended 30 June 2026.
Directors
The names of Directors in office at any time during or since the end of the year are:
• David Coyne (Chair)
• George Bauk
• Brian Booth
• Keith Bowes (appointed 12 August 2025)
• Tejal Magan (appointed 15 September 2025)
• Harrison Barker (resigned 29 July 2025)
• Mark Wheatley (resigned 29 July 2025)
Directors have been in office since the start of the financial year to the date of this report unless otherwise
stated.
Principal Activities
The principal activities of the consolidated group during the financial year consisted of uranium exploration,
mine development and commissioning activities and uranium production ramp-up at the 100% owned
Lance Project located in Wyoming, United States of America, with the objective of becoming a long-term
commercially sustainable uranium producer using the low pH ISR leaching methodology.
Forward Looking Statements
Statements relating to the estimated or expected future production, operating results, cash flows and costs
and financial condition of Peninsula’s planned work at the Company’s projects and the expected results of
such work are forward-looking statements. Forward-looking statements are statements that are not
historical facts and are generally, but not always, identified by words such as the following: expects, plans,
anticipates, forecasts, believes, intends, estimates, projects, assumes, potential and similar expressions.
Forward-looking statements also include reference to events or conditions that will, would, may, could or
should occur. Information concerning exploration results and mineral reserve and resource estimates may
also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to
be present when and if a project is actually developed.
These forward-looking statements are necessarily based upon a number of estimates and assumptions
that, while considered reasonable at the time they are made, are inherently subject to a variety of risks and
uncertainties which could cause actual events or results to differ materially from those reflected in the
forward-looking statements, including, without limitation: uncertainties related to changes in planned work
resulting from logistical, technical or other factors; the possibility that results of work will not fulfil projections/
expectations and realise the perceived potential of the consolidated group’s projects; uncertainties involved
in the interpretation of drilling results and other tests and the estimation of uranium reserves and resources;
risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or
interruptions; the possibility of environmental issues at the consolidated group’s projects; the possibility of
cost overruns or unanticipated expenses in work programmes; the need to obtain permits and comply with
environmental laws and regulations and other government requirements; fluctuations in the price of uranium
and other risks and uncertainties.
Peninsula Energy Limited 9 2026 Annual Report
Review of Operations
Peninsula Energy Limited (‘Peninsula’ or ‘the Company’) is an ASX-listed uranium mining company with
100% ownership of the Lance Project (Lance) and Dagger Project (Dagger), located in Wyoming, USA,
which are operated by Peninsula’s wholly-owned subsidiary, Strata Energy, Inc (Strata).
LANCE PROJECT, WYOMING
The Company’s flagship Lance Project, located in the Tier-1 mining jurisdiction of Wyoming, comprises the
Ross Production Area, Kendrick Mining Area and Barber Exploration Area.
Following the delivery of a Production Reset Plan for the Lance Project in July 2025, Peninsula’s focus
throughout the reporting period was on delivering improved, more consistent flow rates from wellfields,
implementing optimised wellfield pattern designs, and progressing commissioning of the newly expanded
Central Processing Plant (CPP).
First dried yellowcake was produced from the expanded Lance CPP in September 2025.
While meaningful operational progress was achieved during the financial year, the wellfield production
ramp-up has proven to be more challenging than originally anticipated and, as a result, the Company’s
previously announced CY2026 production guidance of 400,000 to 500,000 pounds of U
3
O
8
was withdrawn
subsequent to the end of the reporting period.
Importantly, management’s view is that the challenges encountered during the reporting period are
operational rather than fundamental in nature. They relate primarily to wellfield hydraulics, wellfield
acidification practices, wellfield maintenance practices, solution flow management and chemistry
optimisation, rather than the quality of the Lance uranium resource or the effectiveness of the low-pH ISR
recovery process that is clearly demonstrating significantly higher head grades than the prior alkaline leach
method.
While the timing of the production ramp-up has changed, the Company’s view of the fundamental value
and long-term potential of the Lance Project has not changed.
Strong uranium head grades from Header House 14 “HH14” under low-pH operations, the progress being
achieved with the ongoing acidification success, ongoing training of personnel, and expected operating
cost improvements stemming from the implementation of an owner-operator drilling strategy continue to
support the Company's confidence in the project's future production profile and economics.
Peninsula Energy Limited 10 2026 Annual Report Uranium Production: 4Q26 Jun-26 3Q26 Mar-26 2Q26 Dec-25 1Q26 Sep-25 Total FY26 4Q25 Jun-25 3Q25 Mar-25 2Q25 Dec-24 1Q25 Sep-24 Total FY25 Pounds captured on resin 13,889 3,972 7,369 101 25,331 329 5,975 1,014 - 7,318 Pounds drummed 11,482 2,067 3,000 836 17,385 - - - - - Pounds delivered to converter 10,596 - - - 10,596 - - - - - Produced pounds sold 10,066 - - - 10,066 - - - - - Non-produced pounds purchased/borrowed
-
-
-
-
- 200,000 - - - 200,000 Non-produced pounds sold
-
-
-
-
-
-
-
- 200,000 - - 200,000
-
-
-
U 3 O 8 Inventory (as at): 30 June 2026 30 June 2025 Pounds in circuit 16,547 8,601 Pounds drummed at site 17,385 15,183 Pounds drummed at converter 530 -
Uranium production was lower than expected during the financial year due to several operational factors: • CPP Commissioning Issues: During the financial year, commissioning of the CPP expansion was impacted by the failure of agitator assemblies in both precipitation tanks (CPP Phase 2) and corrosion issues in piping within the original CPP area (CPP Phase I). Both issues were successfully remediated during the financial year, with the focus now on optimising the elution, precipitation, filter press, and drying circuits as part of the CPP Phase 2 ramp-up. Failure of the agitator assemblies in both precipitation tanks was caused by the incorrect installation by the EPC contractor, and the repairs costs were paid for by the EPC contractor as a warranty item. • MU-4 Performance (HH14 and HH16): Flow rate challenges were experienced within MU-4, particularly at Header House 14 (HH14), where gassing issues significantly impacted hydraulic performance and resulted in limited uranium production. Significant remediation efforts were undertaken, including recovery well modifications and back-circulation programs to address the root causes and restore wellfield performance. Hydrogen peroxide injection was temporarily suspended for approximately six weeks while the investigation and remediation activities were completed. This adversely affected uranium grades during the period, however grades began recovering following the recommencement of hydrogen peroxide injection in mid-May 2026 and improved toward the end of the June 2026 Quarter. Header House 16 (HH16) experienced similar gassing-related challenges and also delivered limited uranium production. • MU-3 Performance: Flow rates within MU-3 remained below expectations and are materially lower than those achieved within MU-4. The lower flow environment results in longer pore-volume residence times, delaying the response to chemistry adjustments, including hydrogen peroxide injection, making the flowrate challenge in MU-3 more difficult to address was the decision by the former leadership team for single wells to target up to 3 mining zones. Following the withdrawal of CY2026 production guidance, the decision was made to reduce wellfield maintenance support activities within MU-3 and reprioritise resources toward higher-return production areas. This decision should not be interpreted as a reduction in the Company's long-term resource base or
Peninsula Energy Limited 11 2026 Annual Report
production potential, but rather as a disciplined allocation of operational resources to support
sustainable production growth and improved returns.
• MU-1 Performance: Flow rates within MU-1, an area previously subject to mining and depletion
using an alkaline leach method, were generally in line with expectations, however uranium grades
remained below forecast. Consistent with the Company's revised operating strategy following the
withdrawal of CY2026 production guidance, wellfield maintenance activities within MU-1 have been
scaled back in favour of higher-priority production areas. This approach reflects prudent resource
allocation.
• Ion Exchange (IX) Circuit Commissioning: During commissioning of Trains 3 and 4 of the IX
circuit as part of Phase 2, elevated tail concentrations were identified. Investigation confirmed that
the primary cause was incorrect valve installation during construction. All identified valves have
been inspected and rectified, with final verification activities scheduled for completion in early
August 2026. The timing of the commissioning of IX circuits was delayed due to the agitator issues
reported in February and rectified in April 2026.
• Additional well maintenance requirements: Following resolution of the agitator issues, the
Company identified the need for an extensive well maintenance program across portions of the
wellfield. During the period in which the CPP was offline due to the corrosion issues and limited
on-site resin storage capacity, a number of acidified wells remained idle for an extended period.
These conditions contributed to the flow rate issue and reduced well performance, requiring
maintenance activities to restore flow rates and well productivity. The maintenance program
impacted production during the June 2026 quarter.
Production Guidance Update (released on 22 July 2026)
During the first half of CY2026, the Company continued the commissioning and ramp-up of Lance’s low-
pH ISR operations while progressing the development of MU-4, the Project’s primary production area in
CY2026 and CY2027.
Although meaningful operational progress has been achieved, the production ramp-up has progressed
more slowly than originally anticipated and, as a result, the Company’s previously announced CY2026
production guidance of 400,000 to 500,000 pounds of U
3
O
8
was withdrawn subsequent to the end of the
reporting period.
When CY2026 production guidance was established, the Company expected the successful development
and commissioning of MU-4 to offset lower-than-expected production from MU-3, consistent with previous
market updates.
At the time of reiterating CY2026 production guidance, early acidification results from within MU-4 were
encouraging, additional header houses were advancing on schedule, gassing issues experienced in the
wellfields were being resolved and management expected production rates to progressively increase as
new production areas were brought online.
However, the Company encountered a number of operational challenges, including resolution of gas
generation within sections of the wellfield taking longer than expected, resulting in lower-than-expected
solution flow rates, and the ongoing optimisation of wellfield chemistry.
These factors have extended the time required to achieve stable production but have also provided valuable
operational experience that is now being incorporated into future wellfield development.
As the effect of wellfield chemistry changes are best implemented at the commencement of acidification of
each new header house, it takes a period of time to assess the impact of changes and determine which
changes are the most effective moving forward.
While the timing of the production ramp-up has changed, the Company’s view of the fundamental value
and long-term potential of the Lance Project has not changed. Strong uranium head grades from HH14
under low-pH operations, the progress being achieved with the ongoing acidification success, ongoing
training of personnel, and expected operating cost improvements stemming from the implementation of an
owner-operator drilling strategy continue to support the Company's confidence in the project's future
production profile and long-term commercial sustainability.
Peninsula Energy Limited 12 2026 Annual Report
Notwithstanding this confidence in the long-term outlook for Lance, the operational experience gained from
the transition to low-pH ISR mining has resulted in the Company recognising a non-cash impairment charge
in respect of certain wellfield development assets associated with Mine Units 1, 2 and 3. The impairment
reflects revised expectations regarding the future utilisation and recoverability of these legacy wellfield
assets following changes to wellfield design, wellfield maintenance practices and operating methodologies,
and does not represent a change in the Company’s view of the overall value or future potential of the Lance
Project.
The operational experience gained during the first half of the 2026 calendar year has resulted in a number
of important changes to future development plans, including revised acidification methods, modified
wellfield design, optimisation of hydrogen peroxide management (oxidant added to improve the rate of
uranium extraction), enhanced flow recovery programs and modifications to future header house
development and commissioning activities.
These learnings are now being incorporated into HH15, HH17, HH18 and HH19 and are expected to
support improved production outcomes moving forward.
Operational Update
Encouragingly, the uranium grade response observed to date supports management's confidence in the
underlying Lance uranium resource and low-pH extraction methodology.
Header House 14 (HH14) achieved average uranium concentrations of approximately 50-60 mg/L U
3
O
8
during May and June 2026 (corresponding to Pore Volumes 5 to 6), with multiple individual patterns
reporting grades between 154-374 mg/L U
3
O
8
and peak grade within an individual well of 476 mg/L U
3
O
8
.
These results compare favourably with historical alkaline ISR operations at Lance, which only achieved an
average grade of 22 mg/L U
3
O
8
, demonstrating that uranium mobilisation under low-pH recovery is
performing strongly.
While production volumes have been impacted by hydraulic performance and wellfield optimisation
challenges, the grade response achieved to date indicates that the primary issues encountered during
ramp-up relate to the efficient movement and management of solutions through the orebody rather than
the quality of the resource itself.
Management believes the operational experience gained during this period has significantly enhanced its
understanding of wellfield behaviour and positions the Company to achieve better production performance
as improvement initiatives continue across the project.
Ongoing wellfield maintenance practices are an example of this where treatment methods continue to be
refined for wells that have seen flow rates decrease from the rates at the time of initial operation.
Factors that have impacted production during the year included:
• Timing and rate of hydrogen peroxide addition as they relate to gas generation mechanisms and
the impact on uranium head grades, noting that hydrogen peroxide addition was halted for
extended portions of the ramp-up period to help manage the gassing issue.
• Operational complexities associated with co-mingled acidification and production activities
between adjacent header houses, particularly during the early stages of MU-4 operation.
• Lower-than-expected production flow rates across parts of the developing production footprint
despite extensive maintenance and optimisation efforts.
• Gas generation within portions of the operating wellfield, which reduced recovery performance,
injection performance and overall flow rates.
Since that time, Peninsula has increased its production footprint and accumulated substantially more
operating data across multiple production areas.
While acidification performance has largely progressed in line with expectations and the Company
continues to gain confidence in the suitability of the orebody for low-pH ISR mining, operational
performance during ramp-up has been impacted by several factors which were not fully understood when
guidance was most recently reiterated.
Peninsula Energy Limited 13 2026 Annual Report
Step Change in Wellfield Development Costs
In parallel with operational improvements, Peninsula has commenced several initiatives designed to
improve safety, project economics, reduce dependency on contractors and lower cash costs.
The most significant initiative is the proposed transition of drilling activities to an owner-operated model.
Once fully implemented, management expects this initiative to reduce drilling costs significantly.
The Company has engaged the services of Mr Kent Swick, founder and former Managing Director of Swick
Mining Services, to review drilling operations and provide a strategic plan for drilling going forward. The
Company’s first owner-operated drill rig was delivered on 20 July 2026.
The Company is also advancing a broader cost improvement program focused on wellfield infrastructure
optimisation, reagent consumption improvements, field maintenance efficiency, automation opportunities
and production system reliability improvements. These initiatives are expected to lower the project's
operating cost base while supporting future production growth.
Sales and Marketing
The Company retains significant sales and marketing flexibility, with only one remaining long-term contract
commitment (2028 – 2033, 100,000lbs p.a.), positioning Peninsula to benefit from improving uranium
market fundamentals as production increases.
Dagger Project, Wyoming
The Dagger Project (Dagger) is a high-grade, satellite uranium development introduced in October 2023.
Located in Crook Country, Wyoming within the Black Hills district in the north-east corner of the State, it
lies approximately 20km north-east of the Company’s CPP at the Lance Project.
With a JORC (2012) Inferred Resource of 6.9 million pounds U 3 O 8 at an average grade of 1,037ppm, Dagger provides the Company with the opportunity to extend the Lance project life through a possible future satellite ISR operation. At over twice the grade of U 3 O 8 compared to the Lance Resource, Dagger provides the Company with a relatively high-grade uranium resource, location diversity within a tier-1 mining jurisdiction and further opportunities to increase the scale and quality of Peninsula’s mineral resource holdings. Dagger was established through a series of mineral rights and data acquisition transactions spanning an eight-year period at a cost of only approximately US$800,000 (or US$0.12/lb U 3 O 8 ). The combined State and Federal Mineral rights cover an area with historically identified uranium mineralisation contiguous to past uranium mining sites.
Peninsula Energy Limited 14 2026 Annual Report During the financial year, the Company continued its review of existing drill data to support planning for a future drilling program aimed at upgrading resource confidence levels. In parallel, Peninsula appointed WWC Engineering to commence a Scoping Study to evaluate development options.
SUSTAINABILITY
Peninsula’s sustainability initiatives and commitments are detailed in the Sustainability Report for the year
ended 30 June 2026. Key outcomes included:
Safety
Two Lost Time Injuries (LTI’s) occurred on site during the reporting period.
The sitewide Total Recordable Injury Frequency Rate (TRIFR) at the end of the reporting period was 3.16,
a decrease from the TRIFR at 30 June 2025 of 3.44.
Environment
There were four reportable spills during the financial year – one in MU-1 when a well was restarted while
disassembled, one in MU-4 due to a bleed valve on an injection well left open, two in MU-3 from injection
well failures and one in MU-1 from a Victaulic clamp failure. The spills were all contained on site and
required minimal remediation.
Cultural Heritage Project
Archaeological evidence indicates at least 11,000 years of human activity in the vicinity of the Lance Project.
Strata Energy act as custodians for a website created specifically for the Little Missouri Headwaters Cultural
Heritage Project, allowing users to learn more about the area’s traditional religious and cultural importance
where direct access to those properties might not be possible.
Community
Since inception, Strata Energy has awarded over 50 scholarships to Crook County students through the
Community Energy Scholarship for students who study in the field of science, technology, engineering or
mathematics and the Opportunity Scholarship, for high school graduates pursuing trades or college
education.
OUTLOOK
Nuclear power is increasingly recognised as essential to energy security and decarbonisation. Globally,
governments are extending the life of existing reactors, approving new builds, and providing targeted policy
support to meet net-zero commitments. China’s reactor expansion program, reactor restarts in Japan and
Europe, and growing demand from emerging economies underpin a positive long-term outlook for uranium.
In the United States, nuclear energy is being repositioned as a cornerstone of energy security and energy
dominance. The U.S. remains the world’s largest consumer of uranium, requiring more than 50 million
pounds U
3
O
8
annually, yet domestic production currently totals only two million pounds per annum (less
than 5% of consumption).
Recent policy initiatives, including Executive Orders under the Trump Administration and bipartisan
Congressional support, emphasise the importance of rebuilding domestic nuclear fuel supply chains.
Measures include government-backed uranium purchasing programs, funding for advanced reactor
technologies, and a ban on Russian supply.
At the same time, a new demand driver is emerging from the technology sector. The rapid growth of artificial
intelligence and data centres is driving unprecedented electricity requirements. Major U.S. technology
companies have publicly committed to long-term, carbon-free energy procurement, and several have
announced direct investments in nuclear power projects and advanced reactor development. These
initiatives highlight unique ability of nuclear energy to provide reliable, carbon-free baseload power at the
scale required to support the digital economy.
On the supply side, global uranium mine production continues to fall short of reactor requirements, with
inventories and secondary supplies bridging the gap.
Operational challenges in major producing regions such as Kazakhstan and Canada have further tightened
supply, while utilities are accelerating contracting activity to ensure diversification and security of supply.
Peninsula Energy Limited 15 2026 Annual Report
The uranium price remains strong, reflecting the supply-demand imbalance and increasing utility
contracting. Market commentators expect ongoing support in the medium term as demand growth outpaces
new mine supply.
Against this backdrop, the Lance Project in Wyoming positions Peninsula as a meaningful domestic supplier
of uranium to the U.S. nuclear fuel cycle.
While FY2026 presented a number of operational challenges, it also marked Peninsula's transition from a
paused alkaline leach producer using another facility to produce drummed yellowcake back to uranium
production using the industry leading low-pH ISR method and producing drummed uranium from its own
expanded facilities. The operational knowledge gained during the year, combined with a strengthened
balance sheet, continued optimisation of the Lance Project and favourable long-term uranium market
fundamentals, positions the Company to continue progressing its production ramp-up and longer-term
growth strategy.
CORPORATE
Board & Management Appointments
The Company welcomed Mr Keith Bowes and Ms Tejal Magan to the Board of Directors as Non-Executive
Directors of the Company during the financial year.
Mr Bowes is a seasoned resources executive with 30 years of experience in project development and
operations across Africa, South America, and Australia. He most recently served as Managing Director of
Lotus Resources Limited from 2021 to 2025.
Ms Magan is a financial executive with over 15 years of experience in technical accounting, corporate
governance, risk management and compliance. Most recently, Ms Magan was instrumental in delivering
the value accretive transaction between Spartan Resources Limited and Ramelius Resources Limited.
Long standing Non-Executive Directors Mr Harrison Barker and Mr Mark Wheatley retired from the Board
and Mr David Coyne transitioned from interim Chair to Non-Executive Chair of the Board.
Subsequent to the end of the reporting period, the Company announced the appointment of experienced
ISR uranium executive, Mr Gary Birch, as Chief Technical Officer effective 28th September 2026. Gary
adds strong senior technical leadership across wellfield, plant, maintenance, engineering and major project
disciplines.
Establishment of Technical Committee
Peninsula has established a Technical Committee to strengthen technical oversight, operational review and
continuous improvement at the Lance Project.
Non-Executive Director Mr Keith Bowes has been appointed Chair the Technical Committee, bringing
extensive uranium, processing, project development and governance experience.
Specialist ISR consulting group, Rendement, has been engaged to provide technical assistance and
recommendations primarily focused on wellfield performance.
The Technical Committee will support management’s ongoing operational improvement program, with a
focus on wellfield hydraulics, chemistry optimisation, IX performance, mine development planning and
technical capability building.
Corporate finance
Uranium Sales and Inventory
One sales contract remains in place that requires aggregate delivery of 600,000 pounds U
3
O
8
, with annual
deliveries of 100,000 pounds U
3
O
8
over the calendar years 2028 to 2033 inclusive. The pricing structure is
a blended approach including both base price (escalated) and market-price components. The Company
has the right to terminate this contract early, on or before 31 December 2027, by making a termination
payment. There are also change-of-control provisions entitling the customer to terminate the sales contract
or adjust the pricing.
At 30 June 2026, Peninsula held an aggregate of 34,462 lbs of U
3
O
8
in-circuit and drummed uranium
concentrate.
Peninsula Energy Limited 16 2026 Annual Report
Capital Raisings
Peninsula completed two capital raisings during the reporting period.
The first raising was completed during the September 2025 Quarter, with a total of A$69.9 million (US$46.2
million) raised through a two-tranche institutional placement of approximately A$21.9 million (US$14.5
million), and a A$48.0 million (US$31.7 million) 1-for-1 accelerated non-renounceable entitlement offer at
a price of A$0.30 per share.
A further US$56 million funding package was announced in May 2026 Quarter, comprising a A$21.8 million
(US$15.7 million) institutional placement and A$14.2 million (US$10.2 million) 1-for-11 accelerated non-
renounceable entitlement offer at a price of A$0.35 per share, and a US$30 million convertible note debt
facility secured with Washington H. Soul Pattinson & Co (Soul Patts Convertible Debt Facility) (subject to
satisfaction of customary conditions precedent).
Subsequent to the year end, on 16 July 2026 the customary conditions of the Soul Patts Debt Facility were
satisfied, and the Company announced the issue of the Washington H. Soul Pattinson & Co US$30 million
convertible note and drawdown of funds.
Conversion of Davidson Kempner Debt
During the financial year, the US$15.0 million Davidson Kempner Convertible Loan Facility was fully
converted into Peninsula equity. Loan conversions were completed through the issue of 76,288,909
ordinary shares to a nominee of the Lender.
Following the completion of these conversions, the Company’s outstanding debt to the Lender was reduced
to nil.
Security over Strata’s Assets
At 30 June 2026, the debt provider, Davidson Kempner, had a first ranking charge over all of Strata’s assets
as part of their debt facility. Subsequent to the year end, in July the charge over all of Strata’s assets was
transferred to the new debt provider Washington H. Soul Pattinson & Co as part of the US$30 million Soul
Patts Convertible Debt Facility outlined above.
Financial Performance
Peninsula recorded a consolidated group loss for the year ended 30 June 2026 of US$77.1 million after
income tax (2025: loss of US$12.5 million).
The Company sold 10,066 pounds of uranium produced through the previous toll-treatment process for
US$0.6 million (2025: nil) and recorded other income of US$0.8 million (2025: US$4.7 million), which
primarily related to interest income on cash reserves and other minor revenue.
During the financial year the Company encountered several operational challenges during commissioning
that impacted the flow of uranium loaded lixiviant to the CPP that limited production to a lower-than-
expected 25,331 pounds of uranium captured on resin. Due to the lower-than-expected production during
the financial year unit costs were significantly higher than unit costs expected when in commercial
production. Consequently a US$23.3 million expense was recognised in the Consolidated Statement of
Profit or Loss and Other Comprehensive Income to write the value of uranium inventory down to its
estimated net realisable value.
A US$50.1 million non-cash impairment expense has been recognised principally relating to legacy wellfield
development assets associated with Mine Units 1, 2 and 3, together with certain historically capitalised
costs. This accounting expense reflects the Company’s decision to focus future technical, operational and
capital resources on Mine Unit 4 and future mine development and does not alter the Board's confidence
in the long-term value and potential of the broader Lance Project.
Corporate, site administration, and marketing expenses amounted to US$10.3 million for the year (2025:
US$8.6 million). This included a one-off US$1.7 million non-cash expense relating to the valuation of
options issued under a corporate advisory agreement. The net increase in costs from the prior period
reflects the continuation in the expansion of corporate capability and additional activities in the securing
financing for the Lance Project commissioning and production ramp-up activities which are anticipated to
continue.
Peninsula Energy Limited 17 2026 Annual Report
Financial Position
The Company held US$22.1 in cash reserves at the end of the 2026 financial year. Subsequent to the year
end, in July 2026, the Company fully drew down US$30 million of the Soul Patts Convertible Debt Facility
to continue the ramp-up of production at the Lance Project and commence wellfield development activities
in support of the Company’s Horizon 3 longer term production targets.
The Company’s working capital improved during the year to a US$25.4 million surplus (2025: US$3.1 million
deficit) predominantly due to the recent equity raise and the settlement of the sales contract provision earlier
in the financial year.
During the financial year, the Company’s net assets increased by US$11.4 million primarily due to the
raising of additional equity.
At 30 June 2026 the Company had 571,398,837 ordinary shares on issue, 34,934,789 Warrants, 8,291,934
Options and 9,844,179 Rights. For more information on the unlisted options, warrants and rights exercise
amounts, expiry dates and accounting values refer to the Options, Warrants and Rights table below within
this report and Note 16.
Statement of Cash Flows
During the financial year, the Company spent US$39.0 million (2025: US$8.8 million) on operating activities
including commissioning the Lance Project and supporting corporate and administration activities.
The Company invested US$26.6 million (2025: US$81.9 million) in the construction and development of
the Lance Project assets and ongoing wellfield development activities including completion of construction
of the expanded CPP.
During the year the Company raised US$78.2 million (net of costs) (2025: US$0.1 million) in debt and equity
to finance the completion of construction activities, commissioning costs and wellfield development
activities to ramp-up production at the Lance Project.
Subsequent to the year end, in July 2026, the Company fully drew down US$30 million of the Soul Patts
Convertible Debt Facility.
Uranium Sales and Marketing
The one sales contract held by the Company requires the consolidated group to deliver 600,000 pounds
U
3
O
8
over six years between CY2028 and CY2033 (both years inclusive) at a rate of 100,000 pounds U
3
O
8
per annum. The pricing structure is a blended approach including both base price escalated and market-
price components. The Company has a right to terminate the contract early, on or before 31 December
2027 by making a termination payment.
Financial
Year
Sale Commitments
Pounds U 3 O 8
2026 - 2027 - 2028 50,000 2029 100,000 2030 100,000 2031 100,000 2032 100,000 2033 100,000 2034 50,000 TOTAL 600,000 Mineral Resource Governance The Company ensures that the Mineral Resource estimates for Lance and Dagger are subject to appropriate levels of governance and internal controls. The Mineral Resource estimation procedures are well established and are subject to annual review internally and externally, undertaken by suitably
Peninsula Energy Limited 18 2026 Annual Report competent and qualified professionals. This review process has not identified any material issues or risks associated with the existing Mineral Resource estimates. The Company periodically reviews the governance framework in line with the development of the business. Peninsula reports its Mineral Resources in accordance with the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code) 2012 edition’. Competent Persons named by the Company are Members or Fellows of the Australasian Institute of Mining and Metallurgy and/or Members of Recognised Overseas Professional Organisations included in the list promulgated by ASX and qualify as Competent Persons as defined in the JORC Code. The Company notes that approximately 25,331 pounds of U 3 O 8 was extracted from Lance during the 2026 financial year (2025: 7,318 pounds of U 3 O 8 ). This production represents an immaterial proportion of the current Mineral Resource estimate. Accordingly, no adjustment has been made to the Mineral Resource to reflect this depletion. 1 Mineral
Resource Estimate for the Lance Project The Mineral Resource Estimate for the Lance Project excluding the Dagger Project is presented below following a formal review of the Ross Area within the overall Lance Project area incorporating the outcomes of development and delineation drilling over a 2-year period: 1 Lance Project Mineral Resource Estimate (U 3 O 8 ) prepared in accordance with JORC principles as at 31 December 2025 Resource Classification Tonnes Ore (M) U 3 O 8
(Mkg) U 3 O 8
(Mlbs)
Grade
(% U
3
O
8
) Location
Measured 3.8 2.0 4.3 0.052 Wyoming, USA
Indicated 11.7 5.9 12.9 0.051 Wyoming, USA
Inferred 38.5 18.9 41.7 0.049 Wyoming, USA
Total 53.9 26.7 59.0 0.050
1
Included in an announcement to the ASX released on 25 September 2026: “Mineral Resource Increases to 59Mlbs
U
3
O
8
at the Lance Project”,”: “Mineral Resource Increases 15.6% within the Ross Area following delineation and
development drilling in Mine Unit 4”. Peninsula confirms that it is not aware of any new information or data that materially
affects the information included in this announcement and that all material assumptions and technical parameters
underpinning the estimates continue to apply and have not materially changed. The Company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from the original
market announcement.
2
Dagger Project Mineral Resource Estimate (U
3
O
8
) prepared in accordance with JORC principles
as at 23 October 2023.
No formal review of the Mineral Resource Estimate for Dagger was undertaken during the year and there
was no change in the Mineral Resource Estimate.
Resource
Classification Tonnes Ore (M)
U
3
O
8
(Mkg) U 3 O 8
(Mlbs) Grade (% U 3 O 8 )
Location Inferred 3.0 3.1 6.9 0.104 Wyoming, USA Total 3.0 3.1 6.9 0.104
- Reported above a 0.02% eU3O8 grade and a 0.2 GT cut-off 2 Included in an announcement to the ASX released on 23 October 2023: “Peninsula Establishes Significant New Uranium Development Project”. Peninsula confirms that it is not aware of any new information or data that materially affects the information included in this announcement and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
Peninsula Energy Limited 19 2026 Annual Report
Competent Persons Statement - The information in this report that relates to Exploration Results, Mineral Resources
or Ore Reserves at the Lance and Dagger Projects is based on information compiled by Mr Christopher McDowell.
Mr McDowell is a Registered Professional Member of the Society of Mining, Metallurgy and Exploration (Member No.
4311521). Mr McDowell is a Professional Geologist in the state of Wyoming and is employed by independent consultant
Western Water Consultants, Inc. d/b/a WWC Engineering. Mr McDowell has sufficient experience which is relevant to
the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr McDowell consents to the inclusion in the announcement of the matters based on
his information in the form and context in which it appears.
Significant Changes in State of Affairs
The following significant changes in the state of affairs of the Company occurred during the financial year:
• On 10 July 2025, the Company announced it had secured a US$15 million debt financing with
Davidson Kempner;
• On 28 July 2025, the Company announced the completion of the sales contract book reset with
one remaining contract remaining on foot for a delivery commitment of 600,000lbs of uranium
concentrate over six years between CY2028 and CY2033;
• On 28 July 2025, the Company announced Mr David Coyne transitioned into the permanent role
of Non-Executive Chair, and the appointment of Mr Keith Bowes as a Non-Executive Director. Mr
Mark Wheatley and Mr Harrison Barker resigned from the Board effective 29 July 2025;
• On 12 August 2025, the Company announced it had received regulatory approval to commence
feeding Phase 2 of the Central Processing Plant with uranium contained lixiviant;
• On 22 August 2025, the Company announced a fully underwritten A$70 million equity raise to drive
the reset production plan and the ramp-up of operations at the Lance Project;
• On 22 August 2025, the Company announced a production reset plan with revised production
guidance of up to 50,000lbs for CY2025, 0.4 to 0.5 Mlbs for CY2026 and 0.5 to 0.6 Mlbs for CY2027.
• On 26 August 2025, the Company announced the cessation of the trading halt and reinstatement
of quotation on the ASX;
• On 15 September 2025, the Company announced the appointment of Tejal Magan as a Non-
Executive Director, and the position of Chair of the Audit, Risk and Sustainability Committee
effective 15 September 2025.
• On 16 September 2025, the Company announced first production of U
3
O
8
concentrate
“Yellowcake”;
• On 19 February 2026, the Company announced Central Processing Plant (CPP) was experiencing
commissioning issues that would take the plant offline for 5-7 weeks to replace agitator assemblies.
Wellfield operation and fluid circulation continued uninterrupted to preserve wellfield integrity.
• On 9 April 2026, the Company announced the Central Processing Plant (CPP) recommenced
production;
• On 16 April 2026, the Company announced a trading halt whilst it sought court orders regarding
the validity of undisclosed of share issues during the period 12 February 2026 to7 April 2026. On
22 April 2026 the orders were granted, and the Company was reinstated to quotation on the 22
April 2026;
• On 14 May 2026, the Company announced a US$56 million funding package to accelerate mine
development towards full scale production. The funding package comprised a fully underwritten
US$15.7 million institutional placement, a fully underwritten 1 for 11 accelerated non-renounceable
entitlement offer for US$10.2 million, and a binding commitment for a US$30 million convertible
note debt facility with Washington H. Soul Pattinson & Co;
• On 10 June 2026, the Company announced the execution of the US$30 million convertible note
debt facility agreement with terms materially consistent detailed in the Company’s prospectus
lodged with ASX on 14 May 2026;
• On 25
June 2026, the Company announced the final conversion of the remaining Davidson Kempner convertible debt facility reducing the outstanding debt to nil;
Peninsula Energy Limited 20 2026 Annual Report Dividends The Directors of the parent entity do not recommend the payment of a dividend in respect of the current financial year ended 30 June 2026. Events Since the End of the Financial Year • On 3 July 2026 the Company issued 57,143 subscription shares to a related party of a Director of the Company at the same price as the equity raising as announced to the ASX on 14 May 2026 and as approved by shareholders at the EGM held on 2 July 2026. • On 3 July 2026 the Company 71,429 subscription shares to a related party of a Director of the Company at the same price as the equity raising as announced to the ASX on 14 May 2026 and as approved by shareholders at the EGM held on 2 July 2026. • On 15 July 2026, the Company announced the issue of a Convertible Note Facility to Washington Soul Pattinson & Co for US$30 million before costs. • On 22 July 2026 the Company announced CY2026 production guidance was withdrawn following a slower than anticipated wellfield ramp-up that was largely related to reduced flow rates within Mine Units (MU-1), (MU-3) and wellfield chemistry refinement in the first 2-3 header houses in Mine Unit 4 (MU-4). CY2027 production guidance of 500-600klbs of U 3 O 8 was reconfirmed. • On 3 August 2026 the Company announced the appointment of a Chief Technical Officer and establishment of a Technical Committee. • On 24 September 2026 the Company announced that it expected to recognise a non-cash impairment expense of approximately $50 million as part of the finalisation of the FY2026 financial statements. • On 25 September 2026 the Company announced a revised Mineral Resource Estimate for the Lance Project as at 31 December 2025 of 59.0Mlbs U 3 O 8 , an increase of 1.0Mlbs U 3 O 8 from the previously reported Mineral Resource Estimate. • On 28 September 2026 the Company announced an operational update regarding progress at the Lance Project with encouraging flowrates from HH15 and HH17, modification to a “soft” acidification method for HH17, and the use of the Dissolved Air Floatation (DAF) facility and filters in header houses to assist in the management of solids during the acidification process. The Company also announced the decision to defer a Final Investment Decision for the next mine unit until the first half of CY2027 once more operational data has been obtained.
No other matters or circumstances have arisen since the end of the financial year which significantly
affected or could significantly affect the operations of the consolidated group, the results of those
operations, or the state of affairs of the consolidated group in future financial years.
Likely Developments and Expected Results of Operations
Other than as referred to in this report, further information as to likely developments in the operations of the
consolidated group and expected results of those operations, to the date of this report, are considered
insufficiently developed or so variable in nature as to quantification they remain unable to be accurately
reported.
The material business risks faced by the Company that are likely to impact the financial prospects of the
Company, and how the Company manages these risks are:
• Mineral development risk – Mineral development is a high-risk undertaking, and there is no
guarantee that an identified viable deposit can be economically exploited. The Company’s future
development activities may be affected by a range of factors including geological conditions,
limitations on activities due to permitting requirements, availability of appropriate equipment,
availability of skilled labour, exploration costs, seasonal weather patterns, unanticipated
operational and technical difficulties, industrial and environmental accidents, and many other
factors beyond the control of the Company. The Company is commissioning and ramping-up
activities at the Lance Project that have transitioned the project from an alkaline leach chemistry to
a low-pH (mild acid) leach chemistry. Whilst laboratory and field demonstrations support application
of a low-pH leaching agent, the Company has not yet demonstrated the use of low-pH on a
commercial scale and the operations of the Company may be affected by the success of the
wellfield operation and extraction of uranium from the targeted host rock at the Lance Project;
Peninsula Energy Limited 21 2026 Annual Report
• Operational risks - The operations of the Company may be affected by various factors, including
failure to locate or identify mineral deposits, lower than planned / expected wellfield flow rates,
uranium recovery rates and rate of loading uranium in solution onto ion exchange resin,
unanticipated metallurgical problems, difficulties in commissioning and operating plant and
equipment and the reliance on ongoing wellfield development works. No assurances can be given
that the Company will achieve its commercial targets and that predicted production rates for low-
pH mining can be achieved, despite utilisation of established and proven processes and
techniques;
• Carbonate content - Use of low-pH lixiviants is generally accepted as being applicable to ore bodies
that have a carbonate content of less than 2.0%. Whilst the Company has tested 17 core samples
that have resulted in an average of less than 2.0%, due to the scale and size of the Lance Project
there is no guarantee that the life of mine average will be less than 2.0%. The Company remains
licensed to employ alkaline lixiviants should it encounter areas of higher carbonate content and
determine it to be appropriate;
• Resource estimates - Resource estimates are expressions of judgement based on knowledge,
experience, and industry practice. As further information becomes available through additional
fieldwork and analysis, the estimates are likely to change;
• Exploration risks - There can be no guarantee that the Company's planned exploration and
evaluation programmes will lead to positive exploration and evaluation results and the delineation
of a commercial deposit or further, a commercial uranium mining operation;
• Future capital needs – Further funding may be required by the Company to support its ongoing
activities and operations and expansion plans. There can be no assurance that such funding will
be available on satisfactory terms or at all; and
• General market risks – The Company is exposed to general market and economic condition risks
including adverse changes in levels of economic activity, exchange rates, inflation, interest rates,
commodity prices, availability and above inflationary price increases of reagents (particularly
sulfuric acid), government policies, employment rates and industrial disruption.
Environmental Regulations
The consolidated group’s operations are subject to significant environmental regulation and penalties under
relevant jurisdictions in relation to its conduct of exploration, development, and mining of uranium deposits.
The Directors are not aware of any non-compliance and are of the opinion that sufficient procedures and
reporting processes have been established to enable the consolidated group to meet its responsibilities
and that the consolidated group’s other business segment operations are not subject to any significant
environmental regulations under United States and Australian Law where applicable.
Information on Directors
The names and details of the Directors of Peninsula in office as at the date of this report are:
• Mr David Coyne
Non-Executive Chair (transitioned to chair on 29 July 2025)
Mr Coyne has over 30 years’ experience in the mining, engineering and construction industries,
both within Australia and internationally. Mr Coyne is currently a Non-Executive Director of Torque
Metals Limited. Mr Coyne was previously an Executive Director and Joint Company Secretary of
Spartan Resources Limited and previously served on the Board of listed iron ore miner BC Iron
Limited. Mr Coyne previously held executive positions with Australian listed companies Macmahon
Holdings Limited, VDM Group Limited, Red 5 Limited and unlisted global manganese miner
Consolidated Minerals. Over the past 15 years Mr Coyne has been directly involved in a number
of equity and debt raising transactions and M&A transactions. Mr Coyne has the following interest
in shares and securities in the Company – 395,485 Ordinary Shares and 56,916 Director Service
Rights.
• Mr George Bauk
Managing Director / Chief Executive Officer (appointed 20 January 2025)
Peninsula Energy Limited 22 2026 Annual Report
Mr Bauk brings over 30 years of global experience across the uranium, rare earths, gold, lithium
and graphite sectors. He has successfully established and managed companies, led major projects
from exploration to production, and raised over A$850 million through equity, debt financing and
government grants. Mr Bauk has built strong political and industry connections across Australia,
the USA and key global markets. Mr Bauk has recently served as Executive Chair at Thunderbird
Resources (ASX:THB) and Non-Executive Chair at PVW Resources (ASX:PVW) and Lithium
Australia (ASX:LIT), all roles which he has relinquished prior to commencing his new position with
Peninsula. Mr Bauk was Non-Executive Chair of Spartan Resources (formerly Gascoyne
Resources) (ASX: SPR) (Aug 2020-Feb 2022) and Managing Director and CEO of Northern
Minerals Limited – formerly Northern Uranium (Mar 2010-Jun 2020). Mr Bauk has the following
interest in shares and options in the Company as at the date of this report – 381,818 Ordinary
Shares, 1,000,000 Executive Service Rights, 1,424,830 Performance Rights, and an additional
1,438,432 Performance Rights to be issued effective 1 July 2026 subject to shareholder approval
at the 2026 Annual General Meeting.
• Mr Brian Booth
Non-Executive Director (appointed 14 May 2022)
Mr Booth is an experienced mining executive, who brings over 35 years of experience across the
mineral exploration and mining sectors with major and junior mining companies. During his career,
Mr Booth has held various CEO roles where he was responsible for developing and executing high-
level growth strategies across the mining lifecycle, implementing and progressing key ESG
objectives and securing ongoing funding requirements through the capital markets. Most recently,
Mr Booth was President, CEO and director of Element 29 Resources Inc., a public Company on
the TSX.V (ECU) focused on advancing the exploration and development of the Elida and Flor De
Cobre Cu porphyry projects in Peru. Prior to this role, Mr Booth was Chair of Canadian gold
producer Claude Resources acquired by Silver Standard Resources (Now SSR Mining Inc.) for
C$337M in 2016 and President, CEO and a Director of Lake Shore Gold Corp. when the company
progressed from resource drilling to the underground development of the Timmins West gold
deposit and purchased the Bell Creek Mine and Mill. Lake Shore Gold Corp. was acquired by Tahoe
Resources in 2016 for C$751m. Mr Booth is currently a director of SSR Mining Inc and GFG
Resources Inc. Mr Booth has the following interest in shares and securities in the Company as at
the date of this report – 70,000 Ordinary Shares, 56,916 Director Service Rights and 37,500
unlisted Options exercisable at A$6.00 on or before 26 November 2027.
• Mr Keith Bowes
Non-Executive Director (appointed 12 August 2025)
Mr Bowes is a seasoned resources executive with 30 years of experience in project development
and operations across Africa, South America, and Australia major mining houses before
transitioning to the mid-cap resource sector in 2013. Throughout his career, Mr Bowes has led
numerous project evaluations and study teams, advancing several developments across multiple
commodities including uranium. Mr Bowes is currently Managing Director/CEO of Future Metals
NL. He previously served as Managing Director of Lotus Resources Limited from 2021 to 2026 and
worked previously as the Project Director at Boss Resources for the redevelopment of the
Honeymoon Uranium Mine in South Australia. Mr Bowes has the following interest in shares and
securities in the Company – 71,429 Ordinary Shares, and 37,944 Director Service Rights.
• Ms Tejal Magan
Non-Executive Director (appointed 15 September 2025)
Ms Magan is a seasoned financial executive with over 15 years of experience in equity capital
markets, debt raising, mergers and acquisition and risk management. Ms Magan is currently
Company Secretary of Torque Metals Limited. Ms Magan served as Chief Financial Officer and
Joint Company Secretary at Spartan Resources Limited (Spartan). Ms Magan was instrumental in
delivering the value accretive transaction between Spartan and Ramelius Prior to joining Spartan,
Ms Magan held senior roles in the construction, services, and mining industries for global
companies, including ASX-listed Austal Limited and NYSE-listed Cliffs Natural Resources. Ms
Magan has the following interest in shares and securities in the Company – 57,143 Ordinary
Shares, and 37,944 Director Service Rights.
Peninsula Energy Limited 23 2026 Annual Report
Company Secretary
The following person held the position of Company Secretary at the end of the financial year:
• Mr Jonathan Whyte (appointed 12 April 2006)
Mr Whyte is a Chartered Accountant and has extensive corporate, company secretarial financial
accounting experience across a number of listed and unlisted resource sector companies. Mr
Whyte is currently Company Secretary of ASX listed Skylark Minerals Limited and
Infinity Metals Limited and is Company Secretary of AIM listed Empyrean Energy Plc. Mr Whyte
previously worked in the investment banking sector in London over a period of 6 years for Credit
Suisse and Barclays Capital Plc.
Meetings of Directors
Attendances by each Director who held office during the financial year were as follows:
Directors’ Meetings Committee Meetings
Audit, Risk and Sustainability Committee Remuneration Committee Directors Number Eligible to Attend Number Attended Number Eligible to Attend Number Attended Number Eligible to Attend Number Attended David Coyne 8 8 3 3 2 2 George Bauk 8 8 - - - - Keith Bowes 6 6 3 3 2 2 Tejal Magan 6 5 3 3 - - Brian Booth 8 8 - - 2 2 Harrison Barker 2 2 - - - - Mark Wheatley 2 2 - - - -
Peninsula Energy Limited 24 2026 Annual Report
Options, Warrants, and Rights
At the date of this report, the unissued ordinary shares of Peninsula under options, warrants and rights are
as follows:
Grant Date Date of Expiry Exercise Price
Unissued Shares
Under Options,
Warrants and rights
29/11/2022 26/11/2027 A$6.000 205,000
21/11/2024 30/11/2029 Nil 189,720
30/09/2025 01/10/2028 A$0.450 4,043,467
30/09/2025 01/10/2028 A$0.600 4,043,467
30/09/2025 30/09/2030 A$0.430 24,148,664
30/09/2025 01/07/2030 Nil 2,450,000
28/11/2025 01/07/2030 Nil 75,888
28/11/2025 30/06/2030 Nil 7,128,571
19/05/2026 19/05/2031 A$0.525 10,786,125
Total unissued shares under options, warrants and rights 53,070,902
These financial instruments do not have any rights to participate in any issue of shares or other interests in
the Company or any other entity.
There have been no unissued shares or interests under these financial instruments of any controlled entity
within the consolidated group during or since reporting date.
For details of options and rights issued to Directors and Executives as remuneration, refer to the
Remuneration Report.
No amounts are unpaid on any of the shares. No person entitled to exercise the options, warrants or rights
had or has any rights by virtue of the financial instrument to participate in any share issue of any other body
corporate.
Indemnity and Insurance of Directors, Officers and Auditor
During or since the end of the financial year the Company has given an indemnity or entered into an
agreement to indemnify, or paid or agreed to pay insurance premiums as follows:
The Company has paid premiums to insure each Director and Officer against liabilities for costs and
expenses incurred by them in defending any legal proceedings arising out of their conduct while acting in
the capacity of Director or Officer of the Company, other than conduct involving a wilful breach of duty in
relation to the Company. The amount of the premium paid was US$218,114 (2025: US$245,763) to insure
the Directors and Officers of the Company.
The company has not, during or since the end of the financial year, indemnified or agreed to indemnify the
auditor of the company or any related entity against a liability incurred by the auditor. During the financial
year, the company has not paid a premium in respect of a contract to insure the auditor of the company or
any related entity.
Proceedings on Behalf of the Company
No person has applied for leave of Court to bring proceedings on behalf of the Company or intervene in
any proceedings to which the Company is a party for the purpose of taking responsibility on behalf of the
Company for all or any part of those proceedings. The Company was not a party to any such proceedings
during the year.
Peninsula Energy Limited 25 2026 Annual Report Non-Audit Services The Board of Directors, in accordance with advice from the Audit, Risk and Sustainability Committee, is satisfied that the provision of non-audit services during the year is compatible with the general standard of independence for auditors imposed by the Corporations Act 2001. The Directors are satisfied that the services disclosed below did not compromise the external auditor’s independence for the following reasons: • All non-audit services are reviewed and approved by the Audit, Risk and Sustainability Committee prior to commencement to ensure they do not adversely affect the integrity and objectivity of the auditor; and • The nature of the services provided do not compromise the general principles relating to auditor independence in accordance with APES 110: Code of Ethics for Professional Accountants, including Independence Standards set by the Accounting Professional and Ethical Standards Board. The following fees for non-audit services were paid to the current external auditors: Service 2026 US$ 2025 US$ Taxation advice and compliance services 20,839 35,813 Total 20,839 35,813 Auditor’s Independence Declaration The lead auditor’s independence declaration for the year ended 30 June 2026 has been received and can be found on page 41 of the Annual Report. ASIC Legislative Instrument 2026/183: Rounding of Amounts The Company is an entity to which ASIC Legislative Instrument 2026/183 applies and, accordingly, amounts in the financial statements and Directors’ Report have been rounded to the nearest thousand dollars, or in certain cases, to the nearest dollar.
Peninsula Energy Limited 26 2026 Annual Report
Remuneration Report – Audited
This report outlines the remuneration structure which is in place for Executive Directors, Non-Executive
Directors, and other Key Management Personnel.
Key Management Personnel include:
• Non-Executive Directors
o David Coyne Non-Executive Director - (transitioned to Chair on 29 July 2025)
o Brian Booth Non-Executive Director
o Keith Bowes Non-Executive Director – (appointed 12 August 2025)
o Tejal Magan Non-Executive Director – (appointed 15 September 2025)
o Harrison Barker Non-Executive Director - (resigned 29 July 2025)
o Mark Wheatley Non-Executive Director - (resigned 29 July 2025)
• Executive Directors
o George Bauk Managing Director / Chief Executive Officer – (appointed 20 January
2025)
• Other Key Management Personnel
o Jitu Bhudia Chief Financial Officer - (appointed 17 March 2025)
This Remuneration Report, which has been audited, outlines the Key Management Personnel remuneration
arrangements for the consolidated group, in accordance with the requirements of the Corporations Act 2001
(Cth) and its Regulations.
The principles adopted have been approved by the current Board of the Company and have been set out
in the remuneration summary.
Principles Used to Determine the Nature and Amount of Remuneration
The objective of the Company’s executive reward framework is to ensure reward for performance is
competitive and appropriate for the results delivered. The framework which has been set out under the
remuneration structure below intends to align executive reward with achievement of strategic objectives
and the creation of value for shareholders and conforms to market practice for delivery of reward. The
Board ensures that executive rewards are intended to satisfy the following key criteria for good reward
governance practices:
• competitiveness and reasonableness;
• aligns shareholders and executive interests;
• performance based and aligned to strategic and business objectives; and
• transparency.
During the year, the Remuneration Committee commissioned an independent benchmarking exercise of
Non-Executive Director and Executive Management remuneration. The benchmarking exercise compared
base and incentive remuneration levels of the Company to that of exchange-listed uranium mining and
development peers located in Australia and North America.
The results of the independent benchmarking exercise indicated that remuneration for Non-Executive
Directors was below the peer company median, base fee remuneration for Executive Management was
generally consistent with the peer company median, and the level of incentive remuneration for Executive
Management was below the peer company median. Outcomes from the benchmarking exercise formed the
basis of changes to the maximum incentive remuneration that can be earned by Executive Management.
Despite the independent benchmarking exercise indicating that Non-Executive Director remuneration was
below the peer median, the Board has elected to defer any consideration of base fee remuneration changes
for Non-Executive Directors until the end of the 2026 calendar year, at the earliest.
Peninsula Energy Limited 27 2026 Annual Report
Key Management Personnel
Fees and payments to Key Management Personnel reflect the demands which are made on, and the
responsibilities of, the Key Management Personnel. Fees and payments are reviewed annually by the
Remuneration Committee. The Remuneration Committee also ensures that Key Management Personnel
fees and payments are appropriate and in line with the market. There are no retirement allowances or other
benefits paid to Key Management Personnel other than superannuation guarantee amounts (or overseas
equivalent retirement benefit plans) as described in this Remuneration Report.
The executive remuneration and reward framework has three components:
• base pay and other remuneration such as superannuation / retirement benefits and long service
leave;
• short-term incentives; and
• long-term incentives in the form of equity-based payments.
The combination of these comprises the Key Management Personnel total remuneration. Fixed
remuneration, consisting of base salary and superannuation / retirement benefits are reviewed annually by
the Remuneration Committee, based on individual and area of responsibility performance, the overall
performance of the Company and comparable market remuneration structures / amounts.
Non-Executive Directors
Non-Executive Directors remuneration reflects the demands which are made on, and the responsibilities
of, the Non-Executive Directors.
Fees and payments
Non-Executive Directors’ fees and payments are reviewed annually by the Remuneration Committee. The
annual remuneration including retirement benefits for Non-Executive Board Members was as follows:
• Non-Executive Chair – A$120,000 per annum
• Non-Executive Director – A$80,000 per annum
• Committee Chair – A$10,000 per annum
• Committee member – nil
No changes have been made to Non-Executive Director base fees and payment levels during the year.
Exertion payments of A$17,250 to Mr David Coyne and A$27,560 to Mr Keith Bowes were made during
the year to reflect additional activities undertaken by each respective Non-Executive Director on various
commercial and technical matters. The non-conflicted directors formed the view that the additional activities
undertaken by Mr Coyne and Mr Bowes went well above activities and time commitment typically expected
of a Non-Executive Director.
Service rights
As disclosed in the Company’s 2024 Remuneration Report, a previous independent remuneration review
also indicated that Non-Executive Director fees were below peer median levels. On recommendation of the
independent remuneration consultant, rather that increase cash-based fees, the Board at the time agreed
to increase the remuneration of Non-Executive Directors to include non-performance equity-based fees
(Service Rights) with vesting based on the passage of time and not linked to share price and/or operational
performance.
The equivalent cash value used to determine the number of Service Rights at the time (2024) was as follows: • Non-Executive Chair – A$50,000 per annum • Non-Executive Director – A$40,000 per annum. During the year, two Non-Executive Directors (Mr Keith Bowes and Ms Tejal Magan) were appointed, replacing three Non-Executive Directors that had retired between April and July 2025. To ensure consistency in remuneration amongst Non-Executive Directors, each new Non-Executive Director was awarded Service Rights on a pro rata quantity basis to the remaining Non-Executive Directors, subject to shareholder approval. Shareholder approval for the award of Service Rights to Mr Bowes and Ms Magan was obtained at the Company’s 2025 Annual General Meeting held on 27 November 2025.
Peninsula Energy Limited 28 2026 Annual Report
PENINSULA ENERGY LIMITED CORPORATE GOVERNANCE STATEMENT FOR THE YEAR ENDED 30 JUNE 2026
Peninsula Energy Limited - ABN: 67 062 409 303
Unit 32, 22 Railway Road, Subiaco WA| PO Box 8129, Subiaco East, WA 6008
T: +61 8 9380 9920 | F: +61 8 9381 5064
Introduction
Peninsula Energy Limited (Peninsula or the Company) acknowledges and emphasises the importance of all
Directors, senior executives and employees maintaining the highest standards of corporate governance practice. In
determining what those standards should involve, the Company has referred to the Australian Securities Exchange
(ASX) Corporate Governance Council’s “Corporate Governance Principles and Recommendations, 4
th
Edition” (CGC
Recommendations).
The Company’s practices are largely consistent with the CGC Recommendations, and the Board has made
appropriate statements reporting on the adoption of the CGC Recommendations. Where the Company’s corporate
governance practices depart from the practices in the CGC Recommendations, the Board has disclosed this departure
and the reasons for the adoption of the Company practices as they stand, in compliance with the ‘if not, why not”
principle, and these are summarised in the Appendix 4G and this Corporate Governance Statement.
A copy of the Company’s Charter documents and other documents referred to below are contained on the
Company’s website at https://www.pel.net.au/corporate/corporate-governance/.
Set out below are the principles and recommendations contained in the CGC Recommendations and a discussion on
how they have been implemented by the Company during the year ended 30 June 2026.
PRINCIPLE 1: LAY SOLID FOUNDATIONS FOR MANAGEMENT AND OVERSIGHT
Recommendation 1.1: A listed entity should have and disclose a board charter setting out:
(a) the respective roles and responsibilities of its board and management; and
(b) those matters expressly reserved to the board and those delegated to management.
The functions and responsibilities of the Board and those delegated to management are disclosed in the Board Charter
on the Company’s website.
Without limiting the general role of the Board, which is set out in more detail in the Board Charter, the principal roles
and responsibilities of the Board include the matters set out below, subject to delegation to the Managing
Director/Chief Executive Officer and senior management as specified elsewhere in this statement or as otherwise
appropriate:
• providing leadership and setting the strategic objectives of the Company;
• formulating short-term and long-term strategies to enable the Company to achieve its objectives, ensuring
adequate resources are available to meet strategic objectives and overseeing managements’
implementation of the Company’s objectives and its performance generally;
• identifying other material business risks pertaining to the Company’s operations, and to develop and
implement strategies to manage these risks, and internal control systems to monitor compliance with and
effectiveness of these strategies;
• approving major operating and capital budgets, and variations thereto;
• overseeing the integrity of the Company’s accounting and corporate reporting systems, including the external
audit;
• overseeing the Company’s process for making timely and balanced disclosure of all material information
concerning the Company that a reasonable person would expect to have a material effect on the price or
value of the Company’s securities;
• appointing and approving the terms and conditions and, where necessary, the removal of the Managing
Director/Chief Executive Officer and other senior executives;
• appointing and approving the terms and conditions and, where necessary, the removal of the Chair;
PENINSULA ENERGY LIMITED CORPORATE GOVERNANCE STATEMENT FOR THE YEAR ENDED 30 JUNE 2026
2
• endorsing the terms and conditions of senior executives and, through the Remuneration Committee,
approving the Company’s remuneration framework; and
• monitoring the effectiveness of the Company’s governance practices.
The Board has delegated to the Managing Director/Chief Executive Officer the day-to-day responsibility for running the
Company and for the implementation of the policies and strategies established by the Board. The Board also delegates
to senior management the responsibilities for the day-to-day activities required, within their designated areas of
control, in order for the Company to achieve its strategic objectives.
Recommendation 1.2: A listed entity should undertake:
(a) appropriate checks before appointing a director or senior executive or putting someone forward for
election as a director; and
(b) provide security holders with all material information in its possession relevant to a decision on
whether or not to elect or re-elect a director.
The Board has formally adopted a Nomination Committee Charter. Given the size of the Company and the Board
renewal process undertaken between November 2024 and September 2025, the Board disbanded the Nomination
Committee with this function beknow being undertaken by the full Board for the foreseeable future.
The Company has a procedure guideline for the selection and appointment of Directors. New candidates are
considered with reference to a number of factors which include, but are not limited to, their relevant experience,
expertise and professional qualifications, compatibility with the existing Board and possession of complimentary skill
sets, absence of conflicts of interest or other legal impediments to serving on the Board, credibility within the
Company’s industry and scope of activities and their overall integrity and reputation.
The Company has in place appropriate procedures to ensure that material information relevant to a decision to re-
elect a director is disclosed in the notice of meeting provided to security holders.
Recommendation 1.3: A listed entity should have a written agreement with each director and senior executive
setting out the terms of their appointment.
New directors, senior executives and employees receive a letter of appointment which provide the key terms and
conditions including position description, remuneration and incentives provided, requirements to adhere to Company
policies, term and termination provisions.
Non-Executive Directors are not appointed for fixed terms and are subject to re-election by security holders. Executive
Directors and senior executives have written service agreements which set out the material terms of employment,
including a description of position and duties, reporting lines, remuneration arrangements, leave provisions and
termination rights and entitlements.
Recommendation 1.4: The Company Secretary of a listed entity should be accountable directly to the Board,
through the Chair, on all matters to do with the proper functioning of the Board.
The Company Secretary reports to the Chair on all matters concerning the Board’s activities and responsibilities,
including:
a) advising the Board and its committees on governance matters;
b) monitoring that Board and committee policy and procedures are followed;
c) timely completion and despatch of Board and committee papers;
d) ensuring business at Board and committee meetings is accurately captured in the minutes; and
e) assisting with the induction of directors.
PENINSULA ENERGY LIMITED CORPORATE GOVERNANCE STATEMENT FOR THE YEAR ENDED 30 JUNE 2026
3 Directors may contact the Company Secretary directly and vice versa. In accordance with the Company’s constitution, the appointment and removal of the Company Secretary is a matter for the Board as a whole. A biography of the Company Secretary is available on the website and in the Directors’ Report contained within the Annual Report. Recommendation 1.5: A listed entity should: (a) Have and disclose a diversity policy; (b) Through its board or a committee of the board set measurable objectives for achieving gender diversity in the composition of its board, senior executives and workforce generally; and (c) Disclose in relation to each reporting period:
- the measurable objectives set for that period to achieve gender diversity;
- the entity’s progress towards achieving those objectives; and
- the respective proportions of men and women on the board, in senior executive positions and
across the whole workforce (including how the entity has defined “senior executive” for these
purposes).
The Board has adopted a Diversity Policy as per the CGC Recommendations. The Diversity Policy addresses equal
opportunities in the hiring, training and career advancement of directors, officers and employees. The Diversity Policy outlines the processes by which the Board will set measurable objectives to achieve the aims of its Diversity Policy, with focus on gender diversity within the Company. The Company re-started production in September 2025 at the
Lance Project and continues to ramp up operations, and given the present size of the Company, the Board has not set gender diversity objectives. As production ramps-up at the Lance Project over the next 1 to 2 years, the Board will
evaluate whether the setting of meaningful gender diversity objectives is appropriate for the Company. The Board is committed to workplace diversity and supports representation of women at the senior level of the
Company and on the Board. Given the relatively small size of the Company, the Board has not determined measurable objectives for increasing gender diversity. All personnel are employed and/or promoted on their merits. The Company considers the current Board with one female and four male Board members to be effective and possessing a wide
range of complementary skills. All Board appointment processes are conducted in a manner that promotes gender
diversity, including establishing a structured approach for identifying a pool of candidates, using external experts
where necessary.
The Company is committed to inclusion at all levels of the organisation, regardless of gender, marital or family status, sexual orientation, gender identity, age, disabilities, ethnicity, religious beliefs, cultural background, socio-economic background and perspective The Company is committed to ensuring a diverse mix of skills and talent exists amongst its directors, officers and
employees and is utilised to enhance the Company’s performance.
The Board is responsible for monitoring Company performance in meeting the Diversity Policy requirements, including the achievement of diversity objectives.
The Company has one female Board member.
As at 30 June 2026, the Company and its consolidated entities had nine (2025: seven) female employees:
• a geologist, • an accounts payable clerk,
• a land/payroll manager,
PENINSULA ENERGY LIMITED CORPORATE GOVERNANCE STATEMENT FOR THE YEAR ENDED 30 JUNE 2026
4
• a procurement & inventory manager,
• a manager of human resources,
• a manager of accounting,
• a business service specialist,
• a lead shift operator,
• a construction & maintenance technician.
Female employees represent approximately 12% (2025: 12%) of the total employees of the Group.
Description Male % Female %
30 June 2026
Board of Directors 3 75.0% 1 25.0%
Senior management 8 100.0% 0 0.0%
Other employees 56 86.1% 9 39.9%
Total 67 87.0% 10 13.0%
30 June 2025
Board of Directors 5 100.0% 0 0.0%
Senior management 9 100.0% 0 0.0%
Other employees 42 83.3% 7 16.7%
Total 56 89.3% 7 16.7%
Recommendation 1.6: A listed entity should:
(a) have and disclose a process for periodically evaluating the performance of the Board, its committees
and individual directors; and
(b) disclose for each reporting period, whether a performance evaluation was undertaken in accordance
with that process during or in respect of that period.
As noted in Recommendation 1.2, the Board had established a Nomination Committee to oversee Board and Board
Committee membership succession planning and performance evaluation, in addition to Board member induction
and development. This Committee has now been disbanded, with the Company believing it is appropriate that this
process be now overseen by the full Board.
The Company regularly assesses the skills and competencies required on the Board. During the year, the
Remuneration Committee commissioned an independent benchmarking exercise of Non-Executive Director and
Executive Management remuneration. The benchmarking exercise compared base and incentive remuneration levels
of the Company to that of exchange-listed uranium mining and development peers located in Australia and North
America.
The results of the independent benchmarking exercise indicated that remuneration for Non-Executive Directors was
below the peer company median, base fee remuneration for Executive Management was generally consistent with the
peer company median, and the level of incentive remuneration for Executive Management was below the peer
company median. Outcomes from the benchmarking exercise formed the basis of changes to the maximum incentive
remuneration that can be earned by Executive Management.
PENINSULA ENERGY LIMITED CORPORATE GOVERNANCE STATEMENT FOR THE YEAR ENDED 30 JUNE 2026
5
Despite the independent benchmarking exercise indicating that Non-Executive Director remuneration was below the
peer median, the Board has elected to defer any consideration of base fee remuneration changes for Non-Executive
Directors until the end of the 2026 calendar year, at the earliest.
The Company introduced a new LTI plan in the 2026 financial year designed to more closely align with total shareholder
return (TSR).
The 2027 financial year STI plan is based on achieving targets aligned to the Company’s reset plan.
The criteria for Board, Board Committees and Director evaluation are further described in the Board Charter and also
the Remuneration Committee Charter.
The Board conducted a formal Board performance evaluation and director skill assessment during July 2026
Recommendation 1.7: A listed entity should:
(a) have and disclose a process for evaluating the performance of its senior executives at least once every
reporting period; and
(b) disclose for each reporting period whether a performance evaluation has been undertaken in
accordance with that process during or in respect of that period.
The Company regularly assesses the skills and competencies required of all Executive Directors and senior executives
including measuring their performance against set objectives. A performance review was undertaken of the Managing
Director and Chief Financial Officer during the financial year.
The Company believes the remuneration structure to be adopted, including the short-term and long-term incentive
plans, provides executives with the necessary incentives to achieve short- and long-term objectives that grow long-
term shareholder value. Annual performance reviews of all Executive Directors and senior executives occur to
measure their performance against these set objectives which also influence the amount of short- or long-term
incentives to be paid in a given year.
PRINCIPLE 2: STRUCTURE THE BOARD TO BE EFFECTIVE AND ADD VALUE
Recommendation 2.1: The Board of a listed entity should:
(a) have a nomination committee which has at least three members, a majority of whom are independent
directors; and is chaired by an independent director and disclose the charter of the committee, the
members of the committee; and as at the end of each reporting period, the number of times the
committee met throughout the period and the individual attendances of the members at those
meetings
The Board formed a Nomination Committee during the 2023 financial year, which operated under a Nomination
Committee Charter. The Nomination Committee consisted of three non-executive directors, the majority of whom are
independent and is chaired by an independent director. The Nomination Committee has now been disbanded with this
role and responsibilities assumed by the full Board. The Company has a procedure guideline for the selection and
appointment of Directors as detailed in Recommendation 1.2,
The number of meetings and individual attendances at those meetings is disclosed in the Directors' Report contained
within the Annual Report.
Recommendation 2.2: A listed entity should have and disclose a Board skills matrix setting out the mix of skills
and diversity that the Board currently has or is looking to achieve in its membership.
PENINSULA ENERGY LIMITED CORPORATE GOVERNANCE STATEMENT FOR THE YEAR ENDED 30 JUNE 2026
6
Details of the current Directors, their respective skills, experience, qualifications and a record of their attendance at
meetings are included in the Directors Report within the Annual Report. The Board has developed and implemented a
Board skills matrix in accordance with the recommendations, as per below. With the changes to the Board
composition during 2025, the Company completed an individual director skills assessment for FY2026, as well as
conducting a Board performance review. The results of the Director Skills Assessment are shown in the matrix below:
Peninsula Energy Limited Director Skills Self-Assessment
Skill Area Board Average Strategy 4.4 Financial performance 4.2 Risk and compliance oversight 4.0 Corporate Governance 3.8 Information technology strategy and governance 2.8 Executive management 4.4 Commercial experience 4.4
Principle 2 – Industry Skills Self-Assessment
Skill Area Board Average Technical 3.4 Management 4.4 Project 4.4 Permitting and approvals 3.2 Legal, finance and funding 4.2 Uranium mining industry 3.6 Uranium in-situ recovery mining 2.4 Investor and community relations 4.2
Self-Assessment Ratings – 1 (very weak), 2 (weak), 3 (acceptable), 4 (strong), and 5 (very strong)
Following the Director Skills Assessment process, in September 2026 the Company established a Technical
Committee to strengthen technical oversight, operational review and continuous improvement at the Lance Project.
Non-Executive Director Mr Keith Bowes has been appointed Chair the Technical Committee, bringing extensive
uranium, processing, project development and governance experience. Specialist ISR consulting group, Rendement,
has been engaged to provide technical assistance and recommendations primarily focused on wellfield performance.
The Technical Committee will support management’s ongoing operational improvement program, with a focus on
wellfield hydraulics, chemistry optimisation, IX performance, mine development planning and technical capability
building.
Recommendation 2.3: A listed entity should disclose:
(a) the names of the directors considered by the Board to be independent directors;
(b) if a director has an interest, position, association or relationship of the type described in Box 2.3 but
the Board is of the opinion that it does not compromise the independence of the director, the nature of
the interest, position or relationship in question and an explanation of why the Board is of that opinion;
and
(c) the length of service of each director.
PENINSULA ENERGY LIMITED CORPORATE GOVERNANCE STATEMENT FOR THE YEAR ENDED 30 JUNE 2026
7
The Company recognises the importance of maintaining an appropriate balance between independent and non-
independent representation on the Board. The criteria used by the Company in assessing independence of its Board
members is disclosed in the Corporate Governance Statement in its Annual Report.
The names of the current Directors of the Company, their independence status and their length of service are denoted
below:
• David Coyne Non-Executive Chairperson (Independent) - (appointed interim Non-Executive Chair 1
May 2025, and transitioned to the permanent role on 28 July 2025)
• George Bauk Managing Director/CEO – (appointed 20 January 2025)
• Brian Booth Non-Executive Director (Independent) - (appointed 14 May 2022).
• Keith Bowes Non-Executive Director (Independent) - (appointed 12 August 2025)
• Tejal Magan Non-Executive Director (Independent) - (appointed 15 September 2025)
Details of Directors experience, both current and prior, their interests in the securities of the Company and length of
service are provided in the Directors Report of the Annual Report.
Recommendation 2.4: A majority of the Board of a listed entity should be independent directors.
As indicated in Recommendation 2.3, four of the five directors on the Board are considered independent. The
Company believes it has the appropriate balance between independent and non-independent representation on the
Board.
Recommendation 2.5: The Chair of the Board of a listed entity should be an independent director and, in
particular, should not be the same person as the CEO of the entity.
The Non-Executive Chairperson, Mr. David Coyne, is considered an independent director. Details of Mr. Coyne’s
experience are provided on the Company’s website and also in the Directors Report of the Annual Report.
Recommendation 2.6: A listed entity should have a program for inducting new directors and for periodically
reviewing whether there is a need for existing directors to undertake professional development to maintain the
skills and knowledge needed to perform their role as directors effectively.
The Company does not have a formalised induction program. For a new Director, the Company Secretary provides the
following documents:
• Letter of Appointment including appointment terms, Director’s duties and obligations, and Director
entitlements;
• Consent to Act, which requires formal written consent to become a Director, containing the minimum
information required by the Company; and
• Deed of Indemnity, Insurance and Access.
The Company encourages Directors to attend relevant external seminars, conferences and educational programs for
professional development purposes and relevant industry knowledge. Directors also have the right to seek
independent professional advice at the Company’s expense in accordance with agreed procedures established by the
Board.
PRINCIPLE 3: INSTIL A CULTURE OF ACTING LAWFULLY, ETHICALLY AND RESPONSIBLY
Recommendation 3.1: A listed entity should articulate and disclose its values
The Board acknowledges and emphasises the importance of all Directors and employees maintaining the highest
standards of corporate governance practice and ethical conduct.
PENINSULA ENERGY LIMITED CORPORATE GOVERNANCE STATEMENT FOR THE YEAR ENDED 30 JUNE 2026
8
A code of conduct has been established requiring Directors and employees to:
• act honestly and in good faith;
• exercise due care and diligence in fulfilling the functions of office;
• avoid conflicts and make full disclosure of any possible conflict of interest;
• comply with the law; and
• encourage the reporting and investigating of unlawful and unethical behaviour.
Directors are obliged to be independent in judgement and ensure all reasonable steps are taken to ensure due care is
taken by the Board in making sound decisions.
The Company has adopted a Mission and Values Statement and released its Inaugural Sustainability Report in May
2023. Sustainability Reports are now produced and published annually.
During the 2024 financial year, the Board established a Sustainability Committee. This Committee was disbanded
and now forms part of an expanded Audit, Risk and Sustainability Committee (ARSC), consisting of three Non-
Executive Directors throughout the majority of the year and had an independent Chairperson. One of the purposes of
the ARSC is to assist the Board in fulfilling its oversight responsibilities in relation to the Company's sustainability-
related matters. Key aspects of this responsibility include matters related to its employees, governance, health and
safety, environmental stewardship, community engagement and sustainability reporting.
Recommendation 3.2: A listed entity should:
(a) have and disclose a code of conduct for its directors, senior executives and employees; and
(b) ensure that the board or a committee of the Board is informed of any material breaches of that code.
As detailed above the Company has an established code of conduct and this is disclosed in the Corporate Governance
section of its website. There were no material breaches of that code during the financial year.
Recommendation 3.3: A listed entity should:
(a) have and disclose a whistle-blower policy; and
(b) ensure that the board or a committee of the board is informed of any material incidents reported under
that policy
The Company has in place a formal whistle-blower policy which can be found in the Corporate Governance section of
its website. There were no material breaches of that policy during the financial year.
Recommendation 3.4: A listed entity should:
(a) have and disclose an anti-bribery and corruption policy; and
(b) ensure that the Board or a committee of the Board is informed of any material breaches of that policy
The Company has a formal anti-bribery and corruption policy in place which can be found in the Corporate Governance
section of its website. There were no material breaches of that policy during the financial year.
PRINCIPLE 4: SAFEGUARD THE INTEGRITY OF CORPORATE REPORTS
Recommendation 4.1: The Board of a listed entity should: (a) have an audit committee which:
PENINSULA ENERGY LIMITED CORPORATE GOVERNANCE STATEMENT FOR THE YEAR ENDED 30 JUNE 2026
9
- has at least three members, all of whom are non-executive directors and a majority of whom are independent directors; and
- is chaired by an independent director, who is not the Chair of the Board. and disclose:
- the charter of the committee;
- the relevant qualifications and experience of the members of the committee; and
- in relation to each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings or;
(b) if it does not have an audit committee, disclose that fact and the processes it employs to independently
verify and safeguard the integrity of its corporate reporting, including the processes for the
appointment and removal of the external auditor and the rotation of the audit engagement partner.
During the year the Audit, Risk and Sustainability Committee (ARSC) consisted of three Non-Executive Directors
throughout the majority of the year and has an independent Chairperson. The number of directors on the Committee
during the year is consistent with the ASX Corporate Governance Council recommendations and is appropriate for the
size of the Company. The Chief Financial Officer and Company Secretary are also present at all ARSC meetings. The
ARSC operate under a Board approved charter. A copy of this charter can be accessed on the Company’s website
under Corporate/Corporate Governance.
The Company is comfortable that the Committee members possess the relevant skills and expertise to perform this
function.
In addition to assisting the Board with its oversight of audit and risk matters, the purpose of the Committee is to now
also assist the Board in fulfilling its oversight responsibilities in relation to the Company's sustainability-related
matters. Key aspects of the Sustainability Committee’s responsibility include matters related to its employees,
governance, health and safety, environmental stewardship, community engagement and sustainability reporting.
The ARSC is chaired by an independent director.
The Audit, Risk and Sustainability Committee is as follows:
• Ms Tejal Magan – Non-Executive Director (Chairperson) (Independent)
• Mr Keith Bowes – Non-Executive Director (Independent)
• Mr David Coyne – Non-Executive Director (Independent).
The experience and qualifications of members of the ARSC are detailed in the Directors Report of the Annual Report.
Recommendation 4.2: The Board of a listed entity should, before it approves the entity’s financial statements for
a financial period, receive from its CEO and CFO a declaration that, in their opinion, the financial records of the
entity have been properly maintained and that the financial statements comply with the appropriate accounting
standards and give a true and fair view of the financial position and performance of the entity and that the opinion
has been formed on the basis of a sound system of risk management and internal control which is operating
effectively.
Prior to the approval of the Company’s financial statements for each reporting period, the Chief Financial Officer and
Managing Director / CEO confirms in writing to the Board that the financial reports of the Company for the financial
year:
• present a true and fair view, in all material respects, of the Company’s financial condition and operational
results and are in accordance with relevant accounting practices;
PENINSULA ENERGY LIMITED CORPORATE GOVERNANCE STATEMENT FOR THE YEAR ENDED 30 JUNE 2026
10
• the statement given in accordance with section 295A of the Corporations Act is founded on a sound system
of risk management and internal compliance and control which implements the policies adopted by the
Board; and
• the Company’s risk management and internal compliance and control system is operating efficiently and
effectively in all material respects in relation to financial reporting risks.
Recommendation 4.3: A listed entity should disclose its process to verify the integrity of any periodic corporate
report it releases to the market that is not audited or reviewed by an external auditor.
The Company’s annual and half yearly reports are audited or reviewed (as applicable) by an external auditor. Quarterly
activities and cashflow reports are reviewed by the full Board and the Chief Financial Officer.
PRINCIPLE 5: MAKE TIMELY AND BALANCED DISCLOSURE
Recommendation 5.1: A listed entity should have and disclose a written policy for complying with its continuous
disclosure obligations under Listing Rule 3.1.
The Company has a written Continuous Disclosure Policy which has been adopted to ensure compliance with the
continuous disclosure requirements of the ASX Listing Rules and Corporations Act 2001. The Continuous Disclosure
Policy sets out the rules and procedures for ASX information disclosure, the responsibilities of the Board, senior
executives and staff to ensure price sensitive information is identified, reviewed by management and disclosed to the
ASX in a timely, clear and objective manner, and that all information provided to the ASX is also uploaded to the
Company’s website as soon as possible after disclosure to the ASX.
The Board assumes the roles and responsibilities of ensuring the Company addresses continuous disclosure and
other disclosure related matters.
The Company Secretary manages the Company’s compliance with its continuous disclosure obligations and is
responsible for communications with and coordinating disclosure of information to the ASX.
All announcements released to ASX are circulated to Directors prior to announcement. A copy of the Company’s
Continuous Disclosure Policy is disclosed on the Company’s website under Corporate/Corporate Governance.
Recommendation 5.2: A listed entity should ensure that its board receives copies of all material market
announcements promptly after they have been made.
The Board receive copies of all material announcements.
Recommendation 5.3: A listed entity that gives a new and substantive investor or analyst presentation should
release a copy of the presentation on the ASX Markets Announcements platform ahead of the presentation.
The Company releases copies of investor and analyst presentations on the ASX Markets Announcements platform
ahead of the presentation time.
PRINCIPLE 6: RESPECT THE RIGHTS OF SECURITY HOLDERS
Recommendation 6.1: A listed entity should provide information about itself and its governance to investors via
its website.
The Company’s website contains details of its key projects, all of its activities and operations and corporate
information. The Company website is http://www.pel.net.au.
PENINSULA ENERGY LIMITED CORPORATE GOVERNANCE STATEMENT FOR THE YEAR ENDED 30 JUNE 2026
11 Information about the Company’s corporate governance policies is available on the Company’s website at: https://www.pel.net.au/corporate/corporate-governance/
Recommendation 6.2: A listed entity should have an investor relations program that facilitates effective two- way communication with investors. The Company encourages security holder communication throughout the year and at all times security holders can
Rules 4.7.3 and 4.10.3 ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 1 Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Name of entity Peninsula Energy Limited
ABN/ARBN Financial year ended: 67 062 409 303 30 June 2026 Our corporate governance statement 1 for the period above can be found at: 2
☐
These pages of our annual report:
This URL on our website:
https://www.pel.net.au/corporate/corporate-governance/
The Corporate Governance Statement is accurate and up to date as at 29 September 2026 and has been approved by the board. The annexure includes a key to where our corporate governance disclosures can be located. 3
Date: 29 September 2026
Name of authorised officer
authorising lodgement:
Jitu Bhudia
1
“Corporate governance statement” is defined in Listing Rule 19.12 to mean the statement referred to in Listing Rule 4.10.3 which
discloses the extent to which an entity has followed the recommendations set by the ASX Corporate Governance Council during
a particular reporting period.
Listing Rule 4.10.3 requires an entity that is included in the official list as an ASX Listing to include in its annual report either a
corporate governance statement that meets the requirements of that rule or the URL of the page on its website where such a
statement is located. The corporate governance statement must disclose the extent to which the entity has followed the
recommendations set by the ASX Corporate Governance Council during the reporting period. If the entity has not followed a
recommendation for any part of the reporting period, its corporate governance statement must separately identify that
recommendation and the period during which it was not followed and state its reasons for not following the recommendation and
what (if any) alternative governance practices it adopted in lieu of the recommendation during that period.
Under Listing Rule 4.7.4, if an entity chooses to include its corporate governance statement on its website rather than in its annual
report, it must lodge a copy of the corporate governance statement with ASX at the same time as it lodges its annual report with
ASX. The corporate governance statement must be current as at the effective date specified in that statement for the purposes of
Listing Rule 4.10.3.
Under Listing Rule 4.7.3, an entity must also lodge with ASX a completed Appendix 4G at the same time as it lodges its annual
report with ASX. The Appendix 4G serves a dual purpose. It acts as a key designed to assist readers to locate the governance
disclosures made by a listed entity under Listing Rule 4.10.3 and under the ASX Corporate Governance Council’s
recommendations. It also acts as a verification tool for listed entities to confirm that they have met the disclosure requirements of
Listing Rule 4.10.3.
The Appendix 4G is not a substitute for, and is not to be confused with, the entity's corporate governance statement. They serve
different purposes and an entity must produce each of them separately.
2
Tick whichever option is correct and then complete the page number(s) of the annual report, or the URL of the web page, where
your corporate governance statement can be found. You can, if you wish, delete the option which is not applicable.
3
Throughout this form, where you are given two or more options to select, you can, if you wish, delete any option which is not
applicable and just retain the option that is applicable. If you select an option that includes “OR” at the end of the selection and
you delete the other options, you can also, if you wish, delete the “OR” at the end of the selection.
See notes 4 and 5 below for further instructions on how to complete this form.
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 2 ANNEXURE – KEY TO CORPORATE GOVERNANCE DISCLOSURES
Corporate Governance Council recommendation Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
PRINCIPLE 1 – LAY SOLID FOUNDATIONS FOR MANAGEMENT AND OVERSIGHT
1.1 A listed entity should have and disclose a board charter setting
out:
(a) the respective roles and responsibilities of its board and
management; and
(b) those matters expressly reserved to the board and those
delegated to management.
and we have disclosed a copy of our board charter at:
https://www.pel.net.au/corporate/corporate-governance/
☐ set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable 1.2 A listed entity should: (a) undertake appropriate checks before appointing a director or senior executive or putting someone forward for election as a director; and (b) provide security holders with all material information in its possession relevant to a decision on whether or not to elect or re-elect a director. ☐ set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable 1.3 A listed entity should have a written agreement with each director and senior executive setting out the terms of their appointment. ☐ set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable 1.4 The company secretary of a listed entity should be accountable directly to the board, through the chair, on all matters to do with the proper functioning of the board. ☐ set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable
4 Tick the box in this column only if you have followed the relevant recommendation in full for the whole of the period above. Where the recommendation has a disclosure obligation attached, you must insert the location where that disclosure has been made, where indicated by the line with “insert location” underneath. If the disclosure in question has been made in your corporate governance statement, you need only insert “our corporate governance statement”. If the disclosure has been made in your annual report, you should insert the page number(s) of your annual report (eg “pages 10-12 of our annual report”). If the disclosure has been made on your website, you should insert the URL of the web page where the disclosure has been made or can be accessed (eg “www.entityname.com.au/corporate governance/charters/”). 5 If you have followed all of the Council’s recommendations in full for the whole of the period above, you can, if you wish, delete this column from the form and re-format it.
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 3 Corporate Governance Council recommendation Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
1.5 A listed entity should: (a) have and disclose a diversity policy; (b) through its board or a committee of the board set measurable objectives for achieving gender diversity in the composition of its board, senior executives and workforce generally; and (c) disclose in relation to each reporting period: (1) the measurable objectives set for that period to achieve gender diversity; (2) the entity’s progress towards achieving those objectives; and (3) either: (A) the respective proportions of men and women on the board, in senior executive positions and across the whole workforce (including how the entity has defined “senior executive” for these purposes); or (B) if the entity is a “relevant employer” under the Workplace Gender Equality Act, the entity’s most recent “Gender Equality Indicators”, as defined in and published under that Act. If the entity was in the S&P / ASX 300 Index at the commencement of the reporting period, the measurable objective for achieving gender diversity in the composition of its board should be to have not less than 30% of its directors of each gender within a specified period. and we have disclosed our Diversity Policy and Sustainability Report at: https://www.pel.net.au/corporate/corporate-governance/
and we have disclosed the information referred to in paragraph (c) or exceptions to this at: https://www.pel.net.au/corporate/corporate-governance/
set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable 1.6 A listed entity should: (a) have and disclose a process for periodically evaluating the performance of the board, its committees and individual directors; and (b) disclose for each reporting period whether a performance evaluation has been undertaken in accordance with that process during or in respect of that period. and we have disclosed the evaluation process referred to in paragraph (a) at: https://www.pel.net.au/corporate/corporate-governance/ and whether a performance evaluation was undertaken for the reporting period in accordance with that process at: https://www.pel.net.au/corporate/corporate-governance/
☐ set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 4 Corporate Governance Council recommendation Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
1.7 A listed entity should: (a) have and disclose a process for evaluating the performance of its senior executives at least once every reporting period; and (b) disclose for each reporting period whether a performance evaluation has been undertaken in accordance with that process during or in respect of that period. and we have disclosed the evaluation process referred to in paragraph (a) at: https://www.pel.net.au/corporate/corporate-governance/ and whether a performance evaluation was undertaken for the reporting period in accordance with that process at: https://www.pel.net.au/corporate/corporate-governance/
☐ set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 5 Corporate Governance Council recommendation Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
PRINCIPLE 2 - STRUCTURE THE BOARD TO BE EFFECTIVE AND ADD VALUE 2.1 The board of a listed entity should: (a) have a nomination committee which: (1) has at least three members, a majority of whom are independent directors; and (2) is chaired by an independent director, and disclose: (3) the charter of the committee; (4) the members of the committee; and (5) as at the end of each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or (b) if it does not have a nomination committee, disclose that fact and the processes it employs to address board succession issues and to ensure that the board has the appropriate balance of skills, knowledge, experience, independence and diversity to enable it to discharge its duties and responsibilities effectively. ☐and we have disclosed the evaluation process referred to in paragraph (a) at:
set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable 2.2 A listed entity should have and disclose a board skills matrix setting out the mix of skills that the board currently has or is looking to achieve in its membership. and we have disclosed our board skills matrix at: https://www.pel.net.au/corporate/corporate-governance/ ☐ set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable 2.3 A listed entity should disclose: (a) the names of the directors considered by the board to be independent directors; (b) if a director has an interest, position, affiliation or relationship of the type described in Box 2.3 but the board is of the opinion that it does not compromise the independence of the director, the nature of the interest, position or relationship in question and an explanation of why the board is of that opinion; and (c) the length of service of each director. and we have disclosed the names of the directors considered by the board to be independent directors at: https://www.pel.net.au/corporate/corporate-governance/ and also in the Directors Report contained within the Annual Report. and the length of service of each director at: https://www.pel.net.au/corporate/corporate-governance/ and also in the Directors Report contained within the Annual Report.
☐ set out in our Corporate Governance Statement
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 6 Corporate Governance Council recommendation Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
2.4 A majority of the board of a listed entity should be independent directors. ☐ set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable 2.5 The chair of the board of a listed entity should be an independent director and, in particular, should not be the same person as the CEO of the entity. ☐ set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable
2.6 A listed entity should have a program for inducting new directors and for periodically reviewing whether there is a need for existing directors to undertake professional development to maintain the skills and knowledge needed to perform their role as directors effectively. ☐ set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable
PRINCIPLE 3 – INSTIL A CULTURE OF ACTING LAWFULLY, ETHICALLY AND RESPONSIBLY 3.1 A listed entity should articulate and disclose its values. and we have disclosed our values at: https://www.pel.net.au/corporate/corporate-governance/ and within our Code of Conduct and Sustainability Report. ☐ set out in our Corporate Governance Statement 3.2 A listed entity should: (a) have and disclose a code of conduct for its directors, senior executives and employees; and (b) ensure that the board or a committee of the board is informed of any material breaches of that code. and we have disclosed our code of conduct at: https://www.pel.net.au/corporate/corporate-governance/ ☐ set out in our Corporate Governance Statement 3.3 A listed entity should: (a) have and disclose a whistleblower policy; and (b) ensure that the board or a committee of the board is informed of any material incidents reported under that policy. and we have disclosed our whistleblower policy at: https://www.pel.net.au/corporate/corporate-governance/ ☐ set out in our Corporate Governance Statement 3.4 A listed entity should: (a) have and disclose an anti-bribery and corruption policy; and (b) ensure that the board or committee of the board is informed of any material breaches of that policy. and we have disclosed our ant-bribery and corruption policy at: https://www.pel.net.au/corporate/corporate-governance/ ☐ set out in our Corporate Governance Statement
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 7 Corporate Governance Council recommendation Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
PRINCIPLE 4 – SAFEGUARD THE INTEGRITY OF CORPORATE REPORTS 4.1 The board of a listed entity should: (a) have an audit committee which: (1) has at least three members, all of whom are non- executive directors and a majority of whom are independent directors; and (2) is chaired by an independent director, who is not the chair of the board, and disclose: (3) the charter of the committee; (4) the relevant qualifications and experience of the members of the committee; and (5) in relation to each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or (b) if it does not have an audit committee, disclose that fact and the processes it employs that independently verify and safeguard the integrity of its corporate reporting, including the processes for the appointment and removal of the external auditor and the rotation of the audit engagement partner. and we have disclosed a copy of the charter of the committee at: https://www.pel.net.au/corporate/corporate-governance/
and the information referred to in paragraphs (4) and (5) at: in the Directors report contained within the Annual Report.
☐ set out in our Corporate Governance Statement 4.2 The board of a listed entity should, before it approves the entity’s financial statements for a financial period, receive from its CEO and CFO a declaration that, in their opinion, the financial records of the entity have been properly maintained and that the financial statements comply with the appropriate accounting standards and give a true and fair view of the financial position and performance of the entity and that the opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.
☐ set out in our Corporate Governance Statement 4.3 A listed entity should disclose its process to verify the integrity of any periodic corporate report it releases to the market that is not audited or reviewed by an external auditor.
☐ set out in our Corporate Governance Statement
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 8 Corporate Governance Council recommendation Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
PRINCIPLE 5 – MAKE TIMELY AND BALANCED DISCLOSURE 5.1 A listed entity should have and disclose a written policy for complying with its continuous disclosure obligations under listing rule 3.1. and we have disclosed our continuous disclosure compliance policy at: https://www.pel.net.au/corporate/corporate-governance/
☐ set out in our Corporate Governance Statement 5.2 A listed entity should ensure that its board receives copies of all material market announcements promptly after they have been made. ☐ set out in our Corporate Governance Statement 5.3 A listed entity that gives a new and substantive investor or analyst presentation should release a copy of the presentation materials on the ASX Market Announcements Platform ahead of the presentation. ☐ set out in our Corporate Governance Statement PRINCIPLE 6 – RESPECT THE RIGHTS OF SECURITY HOLDERS 6.1 A listed entity should provide information about itself and its governance to investors via its website. and we have disclosed information about us and our governance on our website at: https://www.pel.net.au/corporate/corporate-governance/
☐ set out in our Corporate Governance Statement 6.2 A listed entity should have an investor relations program that facilitates effective two-way communication with investors. ☐ set out in our Corporate Governance Statement 6.3 A listed entity should disclose how it facilitates and encourages participation at meetings of security holders. and we have disclosed how we facilitate and encourage participation at meetings of security holders at: https://www.pel.net.au/corporate/corporate-governance/
☐ set out in our Corporate Governance Statement 6.4 A listed entity should ensure that all substantive resolutions at a meeting of security holders are decided by a poll rather than by a show of hands.
☐ set out in our Corporate Governance Statement 6.5 A listed entity should give security holders the option to receive communications from, and send communications to, the entity and its security registry electronically. ☐ set out in our Corporate Governance Statement
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 9 Corporate Governance Council recommendation Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
PRINCIPLE 7 – RECOGNISE AND MANAGE RISK
7.1 The board of a listed entity should:
(a) have a committee or committees to oversee risk, each of
which:
(1) has at least three members, a majority of whom are
independent directors; and
(2) is chaired by an independent director,
and disclose:
(3) the charter of the committee;
(4) the members of the committee; and
(5) as at the end of each reporting period, the number
of times the committee met throughout the period
and the individual attendances of the members at
those meetings; or
(b) if it does not have a risk committee or committees that
satisfy (a) above, disclose that fact and the processes it
employs for overseeing the entity’s risk management
framework.
[If the entity complies with paragraph (a):]
and we have disclosed a copy of the charter of the committee at:
https://www.pel.net.au/corporate/corporate-governance/
and the information referred to in paragraphs (4) and (5) at:
in the Directors Report contained within the Annual Report.
☐ set out in our Corporate Governance Statement
7.2 The board or a committee of the board should:
(a) review the entity’s risk management framework at least
annually to satisfy itself that it continues to be sound and
that the entity is operating with due regard to
the risk
appetite set by the board; and
(b) disclose, in relation to each reporting period, whether
such a review has taken place.
and we have disclosed whether a review of the entity’s risk
management framework was undertaken during the reporting period
at:
https://www.pel.net.au/corporate/corporate-governance/
☐ set out in our Corporate Governance Statement
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 10 Corporate Governance Council recommendation Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
7.3 A listed entity should disclose: (a) if it has an internal audit function, how the function is structured and what role it performs; or (b) if it does not have an internal audit function, that fact and the processes it employs for evaluating and continually improving the effectiveness of its governance, risk management and internal control processes. ☐ [If the entity complies with paragraph (a):] and we have disclosed how our internal audit function is structured and what role it performs at: ......................................................................................... [insert location] [If the entity complies with paragraph (b):] and we have disclosed the fact that we do not have an internal audit function and the processes we employ for evaluating and continually improving the effectiveness of our risk management and internal control processes at: ......................................................................................... [insert location]
set out in our Corporate Governance Statement 7.4 A listed entity should disclose whether it has any material exposure to environmental or social risks and, if it does, how it manages or intends to manage those risks. and we have disclosed whether we have any material exposure to environmental and social risks at: https://www.pel.net.au/corporate/corporate-governance/ and, if we do, how we manage or intend to manage those risks at: https://www.pel.net.au/corporate/corporate-governance/
☐ set out in our Corporate Governance Statement
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 11 Corporate Governance Council recommendation Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
PRINCIPLE 8 – REMUNERATE FAIRLY AND RESPONSIBLY
8.1 The board of a listed entity should:
(a) have a remuneration committee which:
(1) has at least three members, a majority of whom are
independent directors; and
(2) is chaired by an independent director,
and disclose:
(3) the charter of the committee;
(4) the members of the committee; and
(5) as at the end of each reporting period, the number
of times the committee met throughout the period
and the individual attendances of the members at
those meetings; or
(b) if it does not have a remuneration committee, disclose
that fact and the processes it employs for setting the level
and composition of remuneration for directors and senior
executives and ensuring that such remuneration is
appropriate and not excessive.
[If the entity complies with paragraph (a):]
and we have disclosed a copy of the charter of the committee at:
https://www.pel.net.au/corporate/corporate-governance/
and the information referred to in paragraphs (4) and (5) at:
in the Directors Report contained within the Annual Report.
☐ set out in our Corporate Governance Statement OR
☐ we are an externally managed entity and this recommendation
is therefore not applicable
8.2 A listed entity should separately disclose its policies and
practices regarding the remuneration of non-executive directors
and the remuneration of executive directors and other senior
executives.
and we have disclosed separately our remuneration policies and
practices regarding the remuneration of non-executive directors and
the remuneration of executive directors and other senior executives
at:
https://www.pel.net.au/corporate/corporate-governance/
☐ set out in our Corporate Governance Statement OR ☐ we are an externally managed entity and this recommendation is therefore not applicable 8.3 A listed entity which has an equity-based remuneration scheme should: (a) have a policy on whether participants are permitted to enter into transactions (whether through the use of derivatives or otherwise) which limit the economic risk of participating in the scheme; and (b) disclose that policy or a summary of it. and we have disclosed our policy on this issue or a summary of it at: https://www.pel.net.au/corporate/corporate-governance/ ☐ set out in our Corporate Governance Statement OR ☐ we do not have an equity-based remuneration scheme and this recommendation is therefore not applicable OR ☐ we are an externally managed entity and this recommendation is therefore not applicable
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 12 Corporate Governance Council recommendation Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
ADDITIONAL RECOMMENDATIONS THAT APPLY ONLY IN CERTAIN CASES 9.1 A listed entity with a director who does not speak the language in which board or security holder meetings are held or key corporate documents are written should disclose the processes it has in place to ensure the director understands and can contribute to the discussions at those meetings and understands and can discharge their obligations in relation to those documents. ☐ and we have disclosed information about the processes in place at: ................................................................................. [insert location] ☐ set out in our Corporate Governance Statement OR ☐ we do not have a director in this position and this recommendation is therefore not applicable OR ☐ we are an externally managed entity and this recommendation is therefore not applicable 9.2 A listed entity established outside Australia should ensure that meetings of security holders are held at a reasonable place and time. ☐ ☐ set out in our Corporate Governance Statement OR ☐ we are established in Australia and this recommendation is therefore not applicable OR ☐ we are an externally managed entity and this recommendation is therefore not applicable
9.3 A listed entity established outside Australia, and an externally managed listed entity that has an AGM, should ensure that its external auditor attends its AGM and is available to answer questions from security holders relevant to the audit. ☐ ☐ set out in our Corporate Governance Statement OR ☐ we are established in Australia and not an externally managed listed entity and this recommendation is therefore not applicable ☐ we are an externally managed entity that does not hold an AGM and this recommendation is therefore not applicable ADDITIONAL DISCLOSURES APPLICABLE TO EXTERNALLY MANAGED LISTED ENTITIES
- Alternative to Recommendation 1.1 for externally managed listed entities: The responsible entity of an externally managed listed entity should disclose: (a) the arrangements between the responsible entity and the listed entity for managing the affairs of the listed entity; and (b) the role and responsibility of the board of the responsible entity for overseeing those arrangements.
☐ and we have disclosed the information referred to in paragraphs (a) and (b) at: ......................................................................................... [insert location]
☐ set out in our Corporate Governance Statement
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations ASX Listing Rules Appendix 4G (current at 17/7/2020) Page 13 Corporate Governance Council recommendation Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement: Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
- Alternative to Recommendations 8.1, 8.2 and 8.3 for externally managed listed entities: An externally managed listed entity should clearly disclose the terms governing the remuneration of the manager.
☐ and we have disclosed the terms governing our remuneration as manager of the entity at: ......................................................................................... [insert location]
☐ set out in our Corporate Governance Statement
ASX ANNOUNCEMENT (ASX: PEN)
28 September 2026
Lance Project, Wyoming, USA
Peninsula Reports Encouraging Operational Progress at
its Lance Project
Header Houses 15 and 17 achieve combined flow rates in line with original design parameters. Newly drilled wells in HH14, HH16 and HH12 deliver strong flow rates and high uranium concentrations.
Highlights
• Header House (HH) 15 commenced production on 2 September 2026 and is currently operating
at ~350 gallons per minute (GPM), with average operating well flow rates broadly consistent with
original design expectations.
o Hydrogen peroxide addition commenced in HH15 in early September, with no gassing
issues observed since its introduction.
• Header House 17 (HH17) commenced acidification on 10 September 2026, following a technical
review and implementation of operational learnings from earlier header houses, and is currently
operating at approximately 500GPM, exceeding the Company’s previously disclosed target of
450GPM. Average operating well flow rates are approximately 15.6GPM per operating well,
compared with approximately 14GPM in the design basis.
o HH17 is the first header house to start up using our “soft start” procedure i.e. an initial lower
acid addition rate, ramping up over time. This is being done to better control calcite
dissolution and acid consumptions.
• Encouraging performance has also been achieved from the newly drilled wells across Header
Houses HH14, HH16 and HH12
o Newly drilled wells in HH14 have demonstrated strong flow rates, well above the average of
the current wells and the original design basis, with uranium grades exceeding 100 mg/L.
o Similar encouraging results have been achieved from new wells drilled in HH16 and HH12,
with the new wells in HH12 achieving flow rates above 14GPM per operating well,
exceeding the historical operating averages of ~6GPM per operating well for that area.
o Results from the newly drilled wells provide encouraging evidence that formation
permeability and mineralisation remain intact in the areas tested, assisting the Company
in better understanding the causes of historical wellfield performance variability and
providing further data to support the ongoing optimisation of the wellfields.
• Cost optimisation initiatives have been implemented across MU-1, including the temporary
suspension of lower-grade wells to focus reagent consumption and operating resources on higher-
return production areas.
• Further optimisation work is also planned for MU-3, where wider spaced patterns and multi-
horizon screening have proven ineffective.
• Technical Committee established to support ongoing operational improvement initiatives.
• Brian Pile appointed Interim Senior Vice President following recent site leadership change.
• FY2027 development sequencing has been refined to incorporate operational learnings,
prioritise optimisation of existing production areas and preserve capital while continuing to
advance the long-term development pathway for Lance.
Further to its operational update released on 22 July 2026, Peninsula Energy Limited (“Peninsula” or the
“Company”) (ASX: PEN, OTCQB: PENMF) is pleased to provide an update on recent development and
operational activities at its Lance Project in Wyoming, USA (“Lance” or the “Project”).
Modified wellfield operating strategies, along with recent drilling and wellfield development activities, have
delivered encouraging results across several header houses, providing additional data on wellfield
performance and with initial indications that the issues previously encountered were transitional and
operational in nature rather than fundamental issues with the orebody or recovery processes.
In the past 2 months we have drilled additional recovery wells within HH12, HH14 and HH16. Highlights
include the flowrate in the additional recovery wells in HH12 (MU-3), which is up to 3 times the flowrate
previously seen in MU-3, and the head grade in the additional recovery wells in HH14 above the average for
the header house.
Management's assessment of these wells is that the issues experienced to date in these header houses i.e. low flow rates and low grades, are not associated with the broader mining zone characteristics, including formation permeability and mineralisation (which both remain intact), but rather are challenges associated with wellfield design, localised well completion conditions, operating strategies and the applied method of acidification and oxidisation. Ongoing drilling, wellfield development and operating data will be required to further test and refine this assessment.
Further investigation is underway to determine what additional actions can be taken within these header
houses and what can potentially be applied to the other header houses.
HH15 commenced production on 2 September 2026 and is currently operating at ~350GPM, with average
operating well flow rates of ~12.5GPM. This is lower than the design basis for this header house of 400GPM
(based on airlift values generated during construction) but remains at an acceptable level for effective
operations. Hydrogen peroxide addition commenced when acidification of the HH was completed and flow
was turned to production. Since commencement of peroxide addition, no gassing issues as been observed.
HH15 was also the first header house to have the modified lixiviant filtration system applied.
HH17 commenced acidification on 10 September 2026 and is currently operating at 500GPM, with average
operating well flow rates of approximately 15.6GPM. This is above the design basis for this header house of
450GPM (based on airlift values generated during construction). Flow rates have actually been limited to
500GPM from the natural flowrate of550GPM due to current capacity constraints within the dissolved air
flotation (DAF) process which is being utilised to manage solids within the lixiviant stream during the
acidification phase. HH17 remains in the early stages of acidification and is the first header house to follow
the “soft acidification” start procedure whereby the acid tenor is ramped-up during the acidification process
to help minimise calcite dissolution and better control acid consumption.
Production Optimisation
As part of ongoing cost optimisation initiatives, wells within MU-1 producing uranium concentrations below
30 mg/L have been temporarily taken offline. This decision reflects current sulfuric acid pricing and the
process plant’s tail grades and is designed to maximise wellfield economics by focusing operating resources
and reagent consumption on higher-return production areas.
Further optimisation work is also planned for MU-3, where the construction of the wellfields have proven
ineffective due to wider spaced patterns and well screening across multiple horizons. A modification to the
design of these wellfields may be warranted.
Measured Development Approach
The operational experience gained through CPP commissioning, the commencement of production from
HH15, acidification of HH17 and recent drilling has enabled the Company to refine its FY2027 development
plan. The resulting plan represents a measured evolution of the development pathway outlined as part of
the 2026 capital raising, with a greater emphasis on operational reliability, wellfield optimisation and capital efficiency.
Under this approach, Peninsula will focus near-term expenditure on activities that support production from existing and recently developed header houses, including improved start-up procedures, filtration, acid management, hydrogen peroxide control and targeted wellfield work. Non-essential capital expenditure will be deferred, and the sequencing of selected infrastructure and future mining-unit development will be aligned with demonstrated operating performance and the availability of further technical data.
The Company will continue to progress the development pathway for MU-5 and MU-6 while preserving financial flexibility. This sequencing is intended to reduce execution risk, improve the quality of future investment decisions and establish a stronger foundation for sustainable production growth. A Final Investment Decision on the full-scale development of the next mine unit is now expected to be made during the first half of CY2027.
Under this measured development approach, Peninsula expects CY2027 uranium production to be within
the previously announced guidance of 500,000 to 600,000 pounds U
3
O
8
. The Company’s focus is on
operational reliability, wellfield optimisation and the incorporation of key learnings from recent
commissioning, acidification and production activities. The long-term development opportunity at Lance
remains unchanged.
Operational Capability
The Company continues to strengthen its technical and operational capability through the recently
established Technical Committee and ongoing support from the expanded technical leadership team. In
addition, Brian Pile has been appointed Acting Senior Vice President following recent site organisational
changes.
Management Comment
Peninsula Managing Director and CEO, George Bauk, said:
“Our modified operating strategy and leach chemistry management is starting to pay dividends. The
commissioning and initial operation of HH15 have been successful. To date we have not seen the drop off in
flow rates experienced during the start-up of previous header houses in MU-4 and the absence so far of any
gassing issues with the introduction of hydrogen peroxide has also shown we have an improved
understanding of our leaching chemistry.
“HH17 has now commenced acidification activities, with multiple modified operating strategies
incorporated including improved filtration techniques, improved acid management and better hydrogen
peroxide control.
“The results from the recently drilled additional wells across HH14, HH16 and HH12 are also encouraging
and represent an important development in our ongoing operational improvement program at Lance.
Importantly, these new wells are outperforming historical operations for those areas and provide further
evidence that the underlying formation continues to respond positively to the correct development and
optimisation activities.
“These learnings are also shaping our FY2027 plan. We are taking a measured approach to the next phase of
development, focusing capital on the areas that can best support reliable production and deferring non-
essential expenditure while further operating data is gathered. This is not a change in our long-term ambition
for Lance; it is a disciplined approach to reducing execution risk and building a stronger platform for
sustainable growth.”
“While further work remains, these initial results from HH15 and HH17, and the new wells in HH14, HH16 and HH12 support our new operating strategies which are starting to show improved wellfield performance and will lead into optimised operating economics and improved operational initiatives that are required to support the long-term development of the Lance Project.”
This announcement has been authorised for release by the Board of Peninsula Energy Limited.
– ENDS –
25 September 2026
Lance Project, Wyoming, USA Mineral Resource Increases to 59.0Mlbs U 3 O 8 at the Lance Project
Mineral Resource increases by 15.6% (or 1.0Mlbs) within the Ross Area following delineation and development drilling in Mine Unit 4
Highlights
• Updated Mineral Resource Estimate (“MRE”) for Peninsula’s flagship Lance Project
increases to 59.0 million pounds U
3
O
8
, comprising 4.3Mlbs U
3
O
8
Measured, 12.9Mlbs U
3
O
8
Indicated and 41.7Mlbs U 3 O 8 Inferred Resources. • Ross Mining Area Mineral Resource increases by 15.6% (1.0Mlbs U 3 O 8 ) to 7.4Mlbs U 3 O 8
following delineation and development drilling associated with Mine Unit 4.
• The updated Ross MRE includes 5.9Mlbs U
3
O
8
in the higher confidence Measured and Indicated
categories, comprising 2.2MlbsU
3
O
8
Measured and 3.7Mlbs U
3
O
8
Indicated.
• The total Lance MRE now stands at 53.9Mt at an average grade of 0.05% U
3
O
8
for 59.0Mlbs of
contained U
3
O
8
, representing a 1.7% increase in contained U
3
O
8
from the previous MRE.
• Mineral Resources at the Kendrick and Barber areas remain unchanged, with further delineation
and development drilling planned at Kendrick.
• The updated MRE incorporates drilling completed to 31 December 2025 and has been prepared
by independent consultant WWC Engineering in accordance with the JORC Code (2012 Edition).
Peninsula Energy Limited (“Peninsula” or the “Company”) (ASX: PEN, OTCQB: PENMF) is pleased to
announce an updated Mineral Resource Estimate (“MRE”) for its flagship Lance Project in Wyoming, USA
(“Lance” or the “Project”).
The updated MRE comprises 53.9 million tonnes at an average grade of 0.050% U
3
O
8
for 59.0 million
pounds (“Mlbs”) of contained U
3
O
8,
representing a 1.7% increase from the previous Lance MRE of
58.0Mlbs. The updated Lance MRE has been prepared by independent consultant, WWC Engineering, in
accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves, 2012 Edition (“JORC Code”) and is reported as at 31 December 2025 - see Table 1 below:
Table 1. Lance Projects Classified Mineral Resource Estimate as at 31 December 2025
2026 Resource Classification
Tonnage
(Mt)
Average Grade
(% U
3
O
8
)
U
3
O
8
Metal
(Kt)
U
3
O
8
Metal
(Mlbs)
Measured 3.8 0.052 2.0 4.3
Indicated 11.7 0.051 5.9 12.9
Inferred 38.5 0.049 18.9 41.7
Total 53.9 0.050 26.7 59.0
The resource estimate has been constrained using a GT contour of 0.2 and a grade cut-off of 200 ppm
U₃O₈. These cut-offs are considered appropriate for the calculation and reporting of ISR resources at the
Lance Project. Resource grades have also been adjusted using an appropriate disequilibrium factor.
Importantly, the updated MRE incorporates a 15.6% increase in the Ross Mineral Resource to 7.4Mlbs
U
3
O
8
, up from 6.4Mlbs U
3
O
8
previously. The increase follows delineation and development drilling
associated with Mine Unit 4, which has enabled further geological interpretation and Mineral Resource
estimation work at Ross.
For comparison purposes, the previous JORC (2012) MRE (31 December 2023) is set out in Table 2 below:
Table 2. Lance Projects Classified Resource Estimate as at 31 December 2023
2026 Resource Classification
Tonnage
(Mt)
Average Grade
(% U
3
O
8
)
U
3
O
8
Metal
(Kt)
U
3
O
8
Metal
(Mlbs)
Measured 3.3 0.051 1.7 3.8
Indicated 11.0 0.051 5.6 12.4
Inferred 38.3 0.049 18.9 41.7
Total 52.6 0.050 26.3 58.0
Peninsula Energy Managing Director and CEO George Bauk said:
“The updated Mineral Resource represents a solid outcome for Lance, with the total Resource increasing
to 59.0Mlbs U₃O₈ and, importantly, the Ross Resource increasing by 15.6% to 7.4Mlbs.
“The increase at Ross reflects the delineation and development drilling undertaken around Mine Unit 4 and
provides further confidence in the Resource base supporting our ongoing operations at Lance.
“We will continue systematic drilling across Lance, including further work at Kendrick, as we progressively
improve our understanding and definition of the broader Resource.”
Detailed Overview
The Lance Project comprises three separate project areas as shown below in Figure 1. The three project
areas are known as:
- The Ross Production Area (Ross)
- The Kendrick Production Area (Kendrick); and
- The Barber Resource Area (Barber)
The Lance MRE is based on a database containing over 4,700 historic drill holes together with 5,351 drill holes completed by Peninsula between 2008 and 31 December 2025. At Ross, development drilling in Mine Unit 3 and delineation and development drilling within Mine Unit 4 has allowed re-interpretation and calculation work to be completed, resulting in a 15.6% increase in the Ross Area MRE from 6.4 to 7.4 Mlbs U 3 O 8 .
The Kendrick Production Area and the Barber Resource Area MREs were unchanged as no drilling occurred within the boundaries of Kendrick and Barber during the period.
The Company is planning additional delineation and development drilling programs at the Kendrick area over the coming years as future mine units are developed that will inform the preparation and publication of future updates to the MRE of the Lance Projects.
The Lance Projects’ MRE, sub-classified by project area, is presented in Table 3.
Table 3. Lance Projects Classified Mineral Resources as of December 31, 2025
Resource
Classification
Tonnage (Mt)
Average Grade (%
U
3
O
8
)
U
3
O
8
Metal (Kt) U
3
O
8
Metal (Mlbs)
Ross Production Area
Measured 1.9 0.052 1.0 2.2
Indicated 3.7 0.045 1.7 3.7
Inferred 1.7 0.040 0.7 1.5
Total 7.3 0.046 3.3 7.4
Kendrick Production Area
Measured 1.2 0.054 0.6 1.4
Indicated 5.4 0.058 3.1 6.9
Inferred 10.2 0.051 5.2 11.5
Total 16.8 0.054 9.0 19.8
Barber Resource Area
Measured 0.7 0.048 0.3 0.7
Indicated 2.5 0.043 1.1 2.4
Inferred 26.6 0.049 13.0 28.7
Total 29.8 0.048 14.4 31.9
Total Lance Projects
Measured 3.8 0.052 2.0 4.3
Indicated 11.7 0.051 5.9 12.9
Inferred 38.5 0.049 18.9 41.7
Total 53.9 0.050 26.7 59.0
(1) Due to rounding, total values may not appear to equal the sum of the individual values.
(2) Based on grade cutoff of 0.02% U
3
O
8
and a grade x thickness (GT) cutoff of 0.2 GT.
(3)
Average grades are calculated as weighted averages.
(4)
Resources are reported as of December 31, 2025.
(5)
The point of reference for mineral resources is in-situ at the Project.
(6)
Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Figure 1: Peninsula’s Lance Project
Lance Project Background
The Lance Projects are located in Crook County, in northeastern Wyoming, approximately 31 miles east-
northeast of the town of Gillette and extend over a strike length of 37 km to the north, and over a strike
width of 8 km.
Within the Lance Projects area, there are several existing land uses including agricultural production
consisting of both crop production and livestock grazing, oil production, recreation, communication and
power lines, and a network of roads.
Peninsula holds mineral rights and surface access rights over a non‐contiguous north‐south distance of approximately 50km (Figure 1).
Peninsula has mineral rights over 67,427 acres (27,286 ha) and surface access rights over land holdings 8,426 acres (3,404 ha). The Lance Project consists of mineral rights covering the approximate areas shown in Figure 3.
Ross consists of approximately 1,731 acres with approximately 128 acres of wellfields currently installed and operational and an additional 180 acres of wellfields to be developed.
Kendrick encompasses approximately 7,992 acres total with approximately 720 acres of proposed
wellfields. Barber encompasses approximately 57,704 acres total.
Figure 2: Mineral rights map for Peninsula’s Lance Projects
Lance Mineral Resource Estimate
The MRE update for Lance was prepared by Mr. Christopher McDowell in accordance with the JORC (2012) Code.
The Company’s MRE estimation procedures are well established and are subject to periodic reviews
undertaken internally and externally by suitably competent and qualified professionals. The MRE for Lance
was prepared in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (JORC Code) by Mr. Christopher McDowell, who qualifies as a competent
person under the JORC (2012) Code. Mr. McDowell is employed by external consultant WWC Engineering.
The reported MREs for the Lance Projects have been estimated utilising a combination of computer-based
polygonal methodology (completed in 2011) and a Grade Thickness (GT) outline resource calculation
methodology.
Uranium grades were determined by a combination of downhole gamma geophysical measurements and chemical assay verification on core samples. Mr. McDowell has verified historical drilling data and records within Lance and consents to the inclusion in this release of the matters based on this information in the form and context in which it appears.
The MRE assumes mining by ISR methods and is reported at a cut-off grade above a 0.02 % eU3O8 and a minimum grade-thickness (“GT”) of 0.2.
Attached to this ASX announcement in APPENDIX 1 is JORC Code, 2012 Edition, Table 1, Sections 1, 2 and 3, which are extracted from the updated JORC Mineral Resource report for Lance Projects. The table is a complete description of the assessment and reporting criteria used in this update to the Lance MRE.
Figure 3 (below) depicts the interpreted uranium mineralisation trends along with the drill hole locations used to establish the mineral trends and resource estimate.
Resource Classification
The MRE has been classified in accordance with the JORC Code (2012). A range of criteria has been
considered in determining this classification including data quality and drill hole spacing.
The drilling density across Ross, Kendrick, and Barber, together with the presence of demonstrated
confined aquifers, which are a requirement for successful ISR mining, support the classification of a
portion of the MRE as Measured and Indicated.
Figure 3: Lance Project Uranium Trend Map with drill hole locations
INFORMATION REQUIRED BY LISTING RULE 5.8.1
Geology and Geological Interpretation
The deposits are epigenetic uranium roll-fronts. The Lance Project is located on the eastern periphery of
the Powder River structural basin and on the western margin of the Black Hills Uplift. Geologic strata in the
vicinity of the Lance Project comprise Cretaceous marine and marginal marine fluvial sediments belonging
successively to the Pierre Shale Formation, Fox Hills Formation and Lance Formation within the Lance
Project. Mineralisation primarily occurs within the upper Fox Hills sandstone, although in localized areas
there is some mineralisation within the overlying Lower Lance sandstone. All the formations of interest
(Lance, Fox Hills, Pierre) outcrop immediately east of the Lance Project at the Black Hills Monocline. The
monoclinal feature caused a steepening of the dip (85°to 90°) to the east of the Lance Project, which
resulted in the formations outcropping more abruptly than the 1° to 2° regional dip to the west.
Roll front deposits result from oxidizing groundwater migrating down gradient through regionally reduced
sediments. Subsequent geochemical cells, produced by migrating groundwater, formed deposits through
a dynamic process of oxidation, dissolution, transportation, reduction, and precipitation of uranium. The
geologic alteration type, depth, and thickness of sand units were used to guide and control mineral
resource mapping, which resulted in the mineral resource estimate. Confidence in continuity of grade and
geology is based on drill hole spacing.
Previous geological modelling of the extensive downhole geophysical data has accurately defined the
impermeable shales and mudstones that form the confining seals to the mineralised aquifers. Figure 4 is
a West to East geologic cross section across the Lance area that depicts geophysical logs and continuity
of the underlying uranium host formations.
Figure 4: Cross Section G-G’ Across the Lance Project Area
Sampling and Sub Sampling Techniques
Drilling and geophysical logging was performed by various previous operators beginning in the 1970s.
Peninsula acquired the Lance Project and historical drilling data in the late 2000s and began operations at
the Lance Project drilling 5,351 holes for exploration, delineation, and production purposes. The resource
estimate was prepared using data collected by downhole radiometric gamma logging, prompt fission
neutron (PFN) logging, core analysis, and laboratory testing and assay. Lithology was recorded for each
drill hole from surface to total depth. Intercept, grade and thickness are determined through interpretation
of the downhole log data. A database of digitized intercept, grade, and thickness, along with lithologic data
from > 10,000 drill holes were used to map the mineralisation. The exploration drilling programs were
based on a grid system, which evenly sampled large areas and avoided introducing sample bias.
Drilling Techniques
Drilling performed by Peninsula and previous operators used the mud rotary method. Core was collected with a HQ triple tube core barrel at 67 drill holes which collected HQ sized core samples.
Criteria used for Classification
The MRE has been classified in accordance with the JORC Code (2012). A range of criteria has been
considered in determining this classification including data quality and drill hole spacing. Criteria for the
mineral classification are as follows:
• Measured Resource: Within the interpreted 0.2 GT contour and 15 m radius from drill hole.
• Indicated Resource: Within the interpreted 0.2 GT contour and 120 m radius from drill hole and
excluding the measured resource component.
• Inferred Resource: Within the interpreted 0.2 GT contour and variable radius excluding the
measured and indicated resource components.
Sample Analysis Method
Assay was by downhole PFN logging which emits neutrons into the formation and measures the induced
epithermal and thermal neutrons emitted back from the formation. The ratio of epithermal to thermal
neutrons is then used to calculate the grade of U
3O8 directly without impacts from disequilibrium.
Downhole radiometric gamma logging, which measures natural gamma counts is used in conjunction with
calibration and disequilibrium data to calculate eU
3O8.
Estimation Methodology
The reported mineral resources for the Lance Project have been estimated utilising computer-based
polygonal methodology completed in 2011 and the GT contour method. The GT contour method is well
accepted within the uranium ISR industry and is suited to guide detailed mine planning and estimates of
recoverable mineral resources found in the Lance Project. The basis of the GT contour method is the GT
(grade x mineralized thickness) values, which are determined for each drill hole using radiometric log
results and a suitable GT cutoff below which the GT value is considered to be zero. The GT values are then
plotted on a drill hole map, and GT contours are drawn accordingly using roll-front data derived from
cuttings and the nature of the gamma anomalies. The resources are calculated from the area within the GT
contour boundaries, considering the disequilibrium factors and the ore zone density.
For the polygonal methodology, grade composites using a 0.02% eU
3
O
8
grade and 0.2 GT lower cutoff were
derived and imported in 3D modelling software. Each grade composite was then extracted to obtain the
centroid position of each composite. Every composite was then analyzed in 3D and manually classified
according to area and vertical horizon. Using Surpac, a Voronoi tessellation algorithm was then applied to
the respective data from each area and horizon to create a series of polygons, each of which were
attributed with thickness, volume, tonnage, and grade. The extent of the polygons was limited either by
adjacent polygons (half‐distance) or by a geologically interpreted outline based on the 0.2 GT contour. The
0.2 GT contours were generated manually for each area and horizon
.
There have been an additional 2,231 close-spaced holes drilled since December 2012. Because of the
additional detailed drilling, mine personnel have refined and updated interpretations of the roll fronts. The
polygonal resource calculation method was not used in this estimation. Resources in the mine units were
derived using the GT contour method. Resources were calculated by first dividing lengths of the roll fronts
into the measured, indicated and inferred categories based on 15 m hole spacing or less for measured
resources and 120 m spacing for indicated resources, while inferred resources lengths are variable and
constrained within interpreted 0.2 GT contour.
GT values from drill holes with a 0.2 GT or better were averaged within the measured categories to
determine their average grade. This same average value was extrapolated into adjacent indicated and
inferred lengths.
Cut-off Grade
The mineral resource estimate assumes mining by ISR methods and is reported at a cut-off grade above a
0.02% (200 ppm) eU
3O8 and a minimum GT of 0.20. The cut-off parameters are typical of ISR uranium
industry standards within the Wyoming ISR uranium industry.
Mining and Metallurgical Methods and Parameters and other Modifying Factors
The MRE assumes mining by modern ISR techniques to recover uranium from the identified mineral trends.
To be amenable to ISR methods, the identified uranium mineralization must occur within saturated zones
laying below the static water table and permeability and transmissivity of the host deposit must allow for
adequate flow of lixiviant. The prior operational activities and available hydrology testing data from across
the project suggests that appropriate hydrogeologic conditions are present to support ISR as a mining
method. Roll-front uranium deposits have been successfully recovered through ISR in this geologic setting.
Metallurgical testing, historical alkaline ISR production and subsequent low-pH field trials have demonstrated uranium recovery from the deposit under ISR conditions, with low-pH ISR forming the basis of the current operating approach.
No other material modifying factors have been considered to date in the preparation of the Mineral
Resource Estimate.
Competent Persons Statement
The information in this announcement that specifically relates to Exploration Results and Mineral
Resources at the Lance Project is based on information compiled by Mr Christopher McDowell. Mr
McDowell is a Registered Professional Member of the Society of Mining, Metallurgy and Exploration
(Member ID #04311521). Mr McDowell is a professional geologist employed by consultant WWC
Engineering, which provides services to the Company on a contractual basis. Mr McDowell has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr.
McDowell consents to the inclusion in the announcement of the matters based on his information in the
form and context in which it appears. Mr. McDowell doesn’t hold securities in the Company.
This announcement has been authorised for release by the Board of Peninsula Energy Limited.
– ENDS –
Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities 1 / 6 Announcement Summary Entity name PENINSULA ENERGY LIMITED Date of this announcement Wednesday September 23, 2026 The +securities the subject of this notification are: Total number of +securities to be issued/transferred ASX +security codeSecurity description Total number of +securities to be issued/transferredIssue date PENABPERFORMANCE RIGHTS80,35722/09/2026 Refer to next page for full details of the announcement Other
Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities 2 / 6 Part 1 - Entity and announcement details 1.1 Name of entity PENINSULA ENERGY LIMITED We (the entity named above) give notice of the issue, conversion or payment up of the following unquoted +securities. 1.2 Registered number type ABN Registration number 67062409303 1.3 ASX issuer code PEN 1.4 The announcement is 1.5 Date of this announcement 23/9/2026 New announcement
Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities 3 / 6 Part 2 - Issue details 2.1 The +securities the subject of this notification are: Please specify Performance Rights to new employee under the Company's long-term incentive framework (Class B). 2.2a This notification is given in relation to an issue of +securities in a class which is not quoted on ASX and which: has an existing ASX security code ("existing class") Other
Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities 4 / 6 Part 3B - number and type of +securities the subject of this notification (existing class) where issue has not previously been notified to ASX in an Appendix 3B Additional +securities in an existing class ASX +security code and description PENAB : PERFORMANCE RIGHTS Date the +securities the subject of this notification were issued 22/9/2026 Will these +securities rank equally in all respects from their issue date with the existing issued +securities in that class Any other information the entity wishes to provide about the +securities the subject of this notification Please provide any further information needed to understand the circumstances in which you are notifying the issue of these +securities to ASX, including why the issue of the +securities has not been previously announced to the market in an Appendix 3B The securities relate to a new employee. Issue details Number of +securities 80,357 Were the +securities issued for a cash consideration? Please describe the consideration being provided for the +securities The performance rights were issued under the Company's long term incentive framework with vesting based on a Relative TSR measurement criteria over a three-year period. Purpose of the issue Other Additional Details Incentive securities under the Company's long term incentive framework. No Yes
Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities 5 / 6 Part 4 - +Securities on issue Following the issue, conversion or payment up of the +securities the subject of this notification, the +securities of the entity will comprise: The figures in parts 4.1 and 4.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing. 4.1 Quoted +securities (Total number of each +class of +securities issued and quoted on ASX) ASX +security code and description Total number of +securities on issue PEN : ORDINARY FULLY PAID571,527,409 4.2 Unquoted +securities (Total number of each +class of +securities issued but not quoted on ASX) ASX +security code and description Total number of +securities on issue PENAAC : OPTION EXPIRING 01-OCT-2028 EX $0.454,043,467 PENAAD : OPTION EXPIRING 01-OCT-2028 EX $0.604,043,467 PENAAF : WARRANTS EXPIRING 30-SEP-2030 EX $0.4524,148,664 PENAC : WARRANTS10,786,125 PENAV : OPTION EXPIRING 26-NOV-2027 EX $6.00205,000 PENAZ : SERVICE RIGHTS2,715,608 PENAB : PERFORMANCE RIGHTS11,840,037 PENAD : CONVERTIBLE NOTES1
Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities 6 / 6 Part 5 - Other Listing Rule requirements 5.1 Were the +securities issued under an exception in Listing Rule 7.2 and therefore the issue did not need any security holder approval under Listing Rule 7.1? 5.2 Has the entity obtained, or is it obtaining, +security holder approval for the issue under listing rule 7.1? 5.2b Are any of the +securities being issued without +security holder approval using the entity's 15% placement capacity under listing rule 7.1? 5.2b.1 How many +securities are being issued without +security holder approval using the entity's 15% placement capacity under listing rule 7.1? 80,357 5.2c Are any of the +securities being issued without +security holder approval using the entity's additional 10% placement capacity under listing rule 7.1A (if applicable)? No Yes No No
ASX ANNOUNCEMENT (ASX: PEN)
24 September 2026
Lance Uranium Project, Wyoming, USA
Non-Cash Impairment
Peninsula Energy Limited (“Peninsula” or the “Company”) (ASX: PEN, OTCQB: PENMF) advises that, as
part of the completion of its financial statements for the year ended 30 June 2026, the Company expects to
recognise a non-cash impairment expense of approximately US$50 million relating to certain legacy
wellfield development assets and other historically capitalised costs at its Lance Project in Wyoming, USA
(“Lance” or the “Project”).
The impairment follows the operational review of Lance completed in July 2026 and the subsequent
decision to prioritise operational and technical resources towards the ongoing development and operation
of Mine Unit 4 (“MU-4”) and future mine development, as outlined in the Company’s Operational and
Production Guidance Update released on 22 July 2026.
As part of this strategy, Peninsula has scaled down production support and maintenance activities within
Mine Unit 1 (“MU-1”) and Mine Unit 3 (“MU-3”), while recent management forecasts do not include the
restart of production from Mine Unit 2 (“MU-2”).
The impairment relates principally to the carrying value of wellfield development assets associated with
MU-1, MU-2 and MU-3, together with the attributable portion of capitalised historical pre-production,
support and financing costs.
These assets were developed under earlier operating regimes and are no longer expected to generate
sufficient future economic benefits to support their existing carrying values.
The impairment is a non-cash accounting adjustment and has no impact on Peninsula’s cash position
or current funding arrangements.
Importantly, the impairment is also specific to these particular assets and does not represent an
impairment of the broader Lance Project. Peninsula continues to expect substantial future economic
benefits from MU-4, future mine units and the Lance Project as a whole.
Lance Development Strategy
As outlined in the Company’s Operational and Production Guidance Update released on 22 July 2026,
Peninsula determined that future capital and operating expenditure would generate superior returns by
focusing on the continued development and optimisation of MU-4.
MU-4 incorporates revised wellfield designs, updated development methodologies and operational
learning generated during Peninsula’s transition to commercial-scale low-pH in situ recovery (ISR) uranium
production. The Company believes these improvements will provide a stronger foundation for future
production growth, lower operating costs and improve long-term Project economics.
The operational experience gained to date during the low-pH ramp-up has also been incorporated into
future wellfield development, including revised acidification strategies, improved wellfield design,
enhanced wellfield flow management programs and modifications to header house development and
commissioning activities.
Peninsula’s view of the fundamental value and long-term potential of the Lance Project remains
unchanged, particularly against the backdrop of robust market fundamentals and demand outlook for
uranium as nuclear power plays a growing role in meeting the energy demand required for the roll-out of
data centres and other high-tech industries.
Management Comment Peninsula Managing Director and CEO, George Bauk, said: “The proposed impairment is a non-cash accounting expense relating specifically to legacy wellfield infrastructure within MU-1, MU-2 and MU-3 and other historically capitalised costs. “Following the operational review completed in July, we made the decision to concentrate our people, capital and technical resources on MU-4 and future mine development, where we believe those resources can generate superior returns. “Importantly, this impairment does not change our view of the underlying value or long-term potential of Lance. The operational experience gained during the ramp-up is being incorporated into MU-4 and future mine units, and we remain focused on establishing a sustainable long-term production platform at Lance.”
The impairment will be recognised in Peninsula’s financial statements for the year ended 30 June 2026. This announcement has been authorised for release by the Board of Peninsula Energy Limited.
– ENDS –
Appendix 3H - Notification of cessation of securities 1 / 4 Announcement Summary Entity name PENINSULA ENERGY LIMITED Announcement Type New announcement Date of this announcement Tuesday September 22, 2026 Details of +securities that have ceased ASX +security codeSecurity description Number of +securities that have ceased The +securities have ceased due to Date of cessation PENABPERFORMANCE RIGHTS101,111Lapse of conditional right to securities because the conditions have not been, or have become incapable of being, satisfied 21/09/2026 Refer to next page for full details of the announcement
Appendix 3H - Notification of cessation of securities Appendix 3H - Notification of cessation of securities 2 / 4 Part 1 - Announcement Details 1.1 Name of +Entity PENINSULA ENERGY LIMITED We (the entity named above) provide the following information about our issued capital. 1.2 Registered Number Type ABN Registration Number 67062409303 1.3 ASX issuer code PEN 1.4 The announcement is 1.5 Date of this announcement 22/9/2026 New announcement
Appendix 3H - Notification of cessation of securities Appendix 3H - Notification of cessation of securities 3 / 4 Part 2 - Details of +equity securities or +debt securities that have ceased ASX +Security Code and Description PENAB : PERFORMANCE RIGHTS Unquoted +equity securities that have ceased Number of securities that have ceased 101,111 Reason for cessation Lapse of conditional right to securities because the conditions have not been, or have become incapable of being, satisfied Date of cessation 21/9/2026 Is the entity paying any consideration for the cessation? Any other information the entity wishes to notify to ASX about the cessation? Lapse of performance rights due to the employee ceasing employment. No
Appendix 3H - Notification of cessation of securities Appendix 3H - Notification of cessation of securities 4 / 4 Part 3 - Issued capital following changes Following the cessation of the +securities the subject of this notification, the issued capital of the entity will comprise: The figures in parts 3.1 and 3.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing. 3.1 Quoted +equity securities and +debt securities (total number of each +class of +securities quoted on ASX) ASX +security code and description Total number of +securities on issue PEN : ORDINARY FULLY PAID571,527,409 3.2 Unquoted +equity securities (total number of each +class of +equity securities issued but not quoted on ASX) ASX +security code and description Total number of +securities on issue PENAAC : OPTION EXPIRING 01-OCT-2028 EX $0.454,043,467 PENAAD : OPTION EXPIRING 01-OCT-2028 EX $0.604,043,467 PENAAF : WARRANTS EXPIRING 30-SEP-2030 EX $0.4524,148,664 PENAC : WARRANTS10,786,125 PENAV : OPTION EXPIRING 26-NOV-2027 EX $6.00205,000 PENAZ : SERVICE RIGHTS2,715,608 PENAB : PERFORMANCE RIGHTS11,759,680 PENAD : CONVERTIBLE NOTES1 Note: the figures stated in the tables above are used to calculate the total market capitalisation of the entity published by ASX from time to time. The table will not include those classes of +securities that have ceased or lapsed in their entirety in ASX records before the announcement date described in Q1.5, even if the entity has advised ASX of a change to that class of +security in Part 2 of this form.
Prompts
Click prompts to add them under the company line, click again to take one out, then copy the result into your AI chat. Shared by Asian Century Stocks and Uncovered Thai Stocks. Thank you.
Company History
Name and ticker changes, and re-registrations under a new regulatory id. When a ticker stopped being used is not recorded, so former tickers are undated.
| Date | Change | Detail |
|---|---|---|
| Dec 31, 2015 | Reporting currency | Its AU reports are in USD instead of AUD from this period. Earlier figures are shown in USD, converted at each period end's exchange rate. |