|
Orezone Gold Corporation is an emerging intermediate gold producer with operations in Canada and West Africa. The company operates the Casa Berardi mine in Quebec and the Bomboré mine in Burkina Faso, which was brought into production in late 2022. Its business focuses on gold mining, with significant mineral endowments and exploration upside at both sites. The company serves the global gold market through its production activities in North America and West Africa. Summarised from the company's own disclosures |
Industry Materials | Homepage orezone.com |
| Sector Basic Materials | IR page orezone.com/investors | |
|
Tags
gold mining, hard rock mining, mineral exploration, underground mining, Casa Berardi, Bomboré
|
Press page orezone.com/press-releases |
Metrics
| Valuation | |
|---|---|
| Market cap | A$ 2.121B |
| Market cap (USD) | $ 1.438B |
| P/E | — |
| PEG | — |
| P/BV | — |
| P/S | — |
| P/OCF | — |
| P/FCF | — |
| Dividend yield | — |
| Turnover / mcap | — |
| Returns | |
|---|---|
| ROE | — |
| ROI | — |
| ROIC | — |
| Profit margin | — |
| Growth | |
|---|---|
| Revenue growing | — |
| Profits growing | — |
| Revenue up 3y | — |
| Revenue up 5y | — |
| Earnings growth 3y (net profit CAGR) | — |
| Quality | |
|---|---|
| Profitable | — |
| Margin expanding | — |
| Buying back stock | — |
| Diluting (TTM) | — |
| Debt/Equity | — |
| Podcast bulls (TTM) | Sign up |
| Podcast bears (TTM) | Sign up |
| Podcast sentiment (TTM) | Sign up |
| Podcast sentiment % (TTM) | Sign up |
| News sentiment (TTM) | 25 |
| Quality score | — |
| Insiders | |
|---|---|
| Buys, 1w | Sign up |
| Buys, 1m | Sign up |
| Buys, 1y | Sign up |
| Sells, 1w | Sign up |
| Sells, 1m | Sign up |
| Sells, 1y | Sign up |
Operating KPIs — quarters
Business figures the company publishes beside its accounts (users, subscribers, same-store sales, production, occupancy ...), read from its results releases and reports, with the growth on the same period a year earlier beneath each: computed from the figures, and as the company states it where it does. Each figure links to its source; counts at a period end show under that period.
Podcast Mentions
Announcements lodged with ASX, newest first, routine forms (director and substantial-holding notices, daily buy-back and quotation notices) included. The link opens the announcement on ASX. Press releases from the company's own website, newest first.
October 30, 2026
October 30, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to announce that it has filed the technical report supporting the Casa Berardi updated Life-of-Mine Plan, previously announced by the Company on September 15, 2026 (the “News Release”).
The technical report titled “Updated Life-of-Mine Plan, Casa Berardi Mine, Northwestern Quebec, Canada, NI 43-101 Technical Report, Preliminary Economic Assessment” (the “Technical Report”) was prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects and has an effective date of June 30, 2026. The Technical Report is available under the Company’s profile on SEDAR+ and on the Company’s website.
There are no material differences between the Technical Report and the results disclosed in the News Release.
ABOUT OREZONE GOLD CORPORATION
Orezone Gold is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2 million oz of gold to-date while the Bomboré mine was constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
October 14, 2026
All dollar amounts are in USD unless otherwise indicated
October 14, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to announce its production results for the three and nine months ended September 30, 2026. The Company will release its third quarter 2026 financial results after market close on Monday, November 16, 2026. Conference call and webcast details are provided at the end of this release.
Patrick Downey, President and CEO, commented “Orezone continued its strong operational momentum through Q3, achieving record production of just under 60,000oz for the quarter. The Company expects Q4 to be yet another record-breaking quarter, with operations at both Bomboré and Casa Berardi to benefit from an increase of higher-grade direct feed ore. Orezone remains well positioned to achieve its production targets at both operations and reiterates its 2026 production guidance.
During Q3, the Company announced the results of the Casa Berardi Life-of-Mine study, which highlighted a 14-year mine life with annual average production of 116,000oz at an All-In Sustaining Cost of $1,877 per ounce1. Catalysts through the balance of the year include exploration results from both Bomboré and Casa Berardi, and a PEA on the Heva-Hosco development project located in Quebec.”
PRODUCTION RESULTS

2 Reflects gold production from the March 25, 2026 acquisition date
3 Average realized gold price shown includes the impact of the Casa Berardi streaming agreement with Franco-Nevada. The Company sold 1,625 gold ounces in each of Q2 and Q3 of 2026 under the streaming agreement at a price equal to 20% of the spot gold price.
Bomboré Operations
Bomboré delivered another solid operating quarter, with tonnes mined exceeding plan. Mining at the high-grade P17 pit focussed on waste stripping in the quarter allowing the quantity of ore released from this pit to improve towards the end of Q3. Additional access to high-grade direct feed ore is scheduled in Q4 which will contribute to greater gold production from hard rock operations.
Processing performance also remained strong in the quarter, with both oxide and hard rock circuits continuing to operate well above nameplate design while maintaining recoveries in line with expectations.
Casa Berardi Operations
Casa Berardi’s gold production was on target in Q3 despite a 7-day suspension of operations in July due to local wildfire activity. Quarterly mill throughput averaged 4,195 tonnes per day (“tpd”) versus planned annual of 3,900 tpd with gold recoveries averaging 89% versus 84% planned.
Completion of the F160 pit waste stripping program in Q3, together with continued operating improvements, position Q4 to be Casa Berardi’s strongest production quarter for the year. Q4 will benefit from increased higher-grade open pit ore, eliminating the need to supplement mill feed with lower-grade stockpiled material as was required in Q3.
Underground production and development rates continued to ramp-up in Q3, supported by the ongoing expansion of the underground workforce and new equipment deliveries. During Q3, Casa Berardi received four additional mobile equipment units, bringing the year-to-date deliveries to seven of the eight planned units for 2026.
Leadership Update
The Company continued to strengthen its leadership team with the appointments of Sophie Bertrand as Vice President, Sustainability, and Christian Bruneau as Vice President, General Manager of Orezone Quebec, effective October 1, 2026 and September 28, 2026, respectively.
Ms. Bertrand brings nearly 20 years of international mining experience in sustainability, environmental and social performance, and responsible mining. Most recently, she served as Senior Director, Sustainability at New Gold, following progressively senior roles with Yamana Gold and Pan American Silver and earlier experience in environmental and social impact consulting. Ms. Bertrand holds an MBA in Global Mining Management from the Schulich School of Business. She will oversee the Company’s sustainability initiatives, including advancing permitting for the Heva-Hosco Project.
Mr. Bruneau brings more than 30 years of mining industry experience, including previous experience at Casa Berardi. He has held senior operational leadership roles with Glencore’s Sudbury Integrated Nickel Operations, serving as Director of the Nickel Rim South and Fraser mines. His career includes leadership of underground mining operations in Ontario, and he studied mining engineering at Université Laval. Mr. Bruneau will be directly responsible for the Casa Berardi operation, with a focus on health and safety, operational performance and execution of the mine’s development plans.
Q3 2026 CONFERENCE CALL AND WEBCAST
-
Monday, November 16, at 3:00 PM PT | 5:00 PM ET | Tuesday, November 17, 2026, 9:00 AM AEDT
-
Participants may listen to the webcast by registering via the following link: https://edge.media-server.com/mmc/p/xy7eeb44
-
Participants may also listen to the conference call by calling North American toll free 1 (800) 715-9871 or 1 (646) 307-1963 outside Canada or the U.S.
-
Conference ID: 6579626
ABOUT OREZONE GOLD CORPORATION
Orezone Gold is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2 million oz of gold to-date while the Bomboré mine was constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
September 15, 2026
All dollar amounts are in USD unless otherwise indicated
September 15, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to announce an updated Life-of-Mine plan for its recently acquired Casa Berardi gold mine, located in Quebec, Canada.
Casa Berardi Life-of-Mine Plan Highlights
- 14-year mine life (2027-2040) with 1,630,000 ounces of total gold production
- Life-of-Mine average annual gold production of 116,000 ounces at AISC1 of $1,877 per ounce
- Years 2030-2038 average annual gold production of 132,000 ounces at AISC of $1,776 per ounce
- After-tax NPV5%2 of $1.05 billion at Base Case consensus gold prices3
- **After-tax NPV5% increases to $**1.43 billion at $4,350 per ounce spot gold price4
- Orezone has reinitiated exploration at Casa Berardi, currently ramping-up drilling to 100,000 metres per annum. Multiple actionable exploration fronts, with clear opportunity to increase underground grades, expand production and further reduce costs
Patrick Downey, President and CEO, commented “The release of the Casa Berardi Life-of-Mine plan is a significant milestone for Orezone. The result of the Life-of-Mine plan clearly underscores the opportunity and value proposition identified by Orezone in acquiring the Casa Berardi Mine. Its transformational acquisition positions the Company as an established multi-asset producer, with a significant and fully funded growth profile.
The Life-of-Mine plan highlights a robust 14-year mine life, with average annual production of 116,000 ounces at an All-In Sustaining Cost (“AISC”) of US$1,877 per ounce. The initial years of the plan are marked by a ramp-up phase, with investments in new equipment, underground development and open pit waste stripping, supporting an increase in average annual production to a sustained 132,000 ounces. The Company views this Life-of-Mine plan as an excellent baseline, which with ongoing optimization and exploration, we fully expect to further increase the production profile and lower costs.
This upside potential has already been well demonstrated, with the Casa Berardi mill continuously operating at rates above that assumed in the Life-of-Mine plan, and initial exploration results highlighting the near-term potential to delineate higher-grade underground zones of near-surface mineralization.
The Casa Berardi Life-of-Mine plan also marks an important milestone in Orezone’s expansion into Quebec, the foundation of which is the support of our dedicated employees, community partners and First Nations. The Company looks to continue this momentum with the release of a PEA study on its Heva-Hosco development project, located along the prolific Cadillac Larder-Lake Break in Quebec, in the fourth quarter.”
Table 1 – Casa Berardi Life of Mine Plan Summary
Figure 1 – Casa Berardi Production and AISC Profile
Mineral Resource Statement
The updated Casa Berardi mineral resource estimates have an effective date of June 30, 2026. The mineral resource excludes material mined up to the effective date, as well as excluding stockpiles.
Table 2 – Casa Berardi Mineral Resource
Mine Plan and Production Overview
The Casa Berardi Life-of-Mine plan comprises 14 years of continuous operations from 2027 to 2040, producing a total of 1,630,000 ounces of gold. Mining will be conducted via both underground and open pit, with ore processed at the Casa Berardi mill. The Casa Berardi Life-of-Mine plan includes Inferred Mineral Resources, and as such is classified as a Preliminary Economic Assessment (“PEA”)6. No mineral reserves are defined for Casa Berardi. The mine plan was completed by BBA Consultants under guidance from Orezone. The open pit and underground mine plans were evaluated using DeswikTM algorithms to create optimal mineable shapes based on economic and technical input parameters including mine dilution and recovery. Underground stope design parameters were based on current operating experience, with stopes that were uneconomic due to distance from infrastructure excluded from the Life-of-Mine plan.
Figure 2 – Underground and Open Pit Production Profile
Underground Mining
Casa Berardi has a long history of underground mining, dating back to the late 1980s. In recent years, mine planning by the previous operator prioritized a shift to open pit operations, resulting in a sharp decrease in investment in underground development, equipment and exploration. Orezone’s Life-of-Mine plan is centered on re-establishing historical underground production rates at Casa Berardi, which based on the current mineral resource and sustained investment, supports a 12-year underground mine life.
The underground mine plan is based on continuous operations at the currently active West Mine (2027-2038), with the past producing East Mine re-commencing operations within three years (2029-2038). Underground mining practices are well established at Casa Berardi, using conventional underground equipment and long-hole open stoping methods. Mining at Casa Berardi is owner-operated, with a mining contractor recently mobilized to increase lateral development rates.
Several new pieces of underground mining equipment have recently been delivered to site, with the staged procurement of new equipment continuing through 2029 as underground mining rates are increased.
The West Mine is accessed via a hoist or a ramp down to the 1,080m level, with ore brought to surface and transported 5 kilometres to the Casa Berardi mill utilizing 60t trucks. Access to the East Mine is provided by a separate ramp, collared near the Casa Berardi mill, which has been developed down to the 730m level. Active mining in the East Mine ceased in 2023 and work has now commenced on the re-opening of the East Mine access and ramp in anticipation of re-commencement of operations in 2029.
Open Pit Mining
Mining is carried out using conventional drill, blast, load and haul surface mining methods, with an owner-operated fleet. A stockpiling strategy is employed to prioritize delivery of the highest-grade ore to the mill, with stockpiles developed to maintain consistent mill throughput during waste stripping phases.
The Life-of-Mine plan comprises four separate open pits. The current F160 pit phase is scheduled to be complete at the end of 2026, with open pit production shifting to the F134 pit for 2027 and 2028. The F160 pit expansion waste cutback is scheduled to commence in late 2027, with ore mining from the F160 pit to resume in late 2028 and continue through to 2031. The Principal (2031-2038) and WMCP (2034-2040) pits will be mined thereafter.
The F134 Phase 1 pit is permitted, with the Phase 2 permit amendment to be submitted in the fourth quarter. The F160 pit expansion will require a permit amendment, which will be submitted in the fourth quarter as well. The Principal and WMCP pits, and associated surface infrastructure, will be subject to further permitting requirements. This work has commenced and will be advanced over the coming years.
Processing
The Casa Berardi processing facility has a nameplate capacity of 3,730tpd. Run-of-mine ore is processed using a conventional single stage primary crusher followed by a two-stage SAG and ball mill grinding circuit, gravity circuit, and CIL circuit, producing gold doré. Life-of-mine average annual projected gold recoveries range from 80% to 88% for underground material and from 77% to 91% for open pit material.
Approximately 15-20% of the Casa Berardi tailings are used in the mine backfill cycle. Tailings that are not used for mine backfill are disposed of at the tailings storage facility (“TSF”). The current TSF design will support tailings deposition until 2031, after which the exhausted F134 and F160 pits will be utilized for in-pit tailings deposition. The F160 pit will host multiple years of excess tailings capacity beyond the current Life-of-Mine plan.
Figure 3 – Casa Berardi Long Section Showing Open Pits and Planned Underground Stoping Zones
Table 3 – Casa Berardi Life-of-Mine Schedule
Gold Price Sensitivity
Table 4 – After-Tax Gold Price Sensitivity
Enhancement Opportunities
Casa Berardi hosts multiple opportunities to further expand the mine’s production profile and lower costs, including:
- Mineral Resource Expansion: The Casa Berardi mineral resource remains open for expansion on multiple fronts, including (1) opportunities to upgrade the resource category of multiple mineralized lenses within the Life-of-Mine plan, (2) the expansion of current underground ore zones that remain open at depth, and (3) the development and growth of new underground zones including the down-plunge continuation of the F134 and F160 zones beneath the open pits. In addition, drill results disclosed in the May 19, 2026 news release, as well as all drilling executed since then, are not included in the resource estimate supporting the Life-of-Mine-plan.
- New Zone Discovery: In recent years, resource growth at Casa Berardi has largely been the product of incremental step-out drilling from known zones of mineralization. Given the significant exploration and mining datasets dating back to the 1980’s at Casa Berardi, Orezone is developing the first comprehensive mineral system model supporting the identification and ranking of prospective exploration targets in the near-mine area and beyond. With reference to the south side of the Casa Berardi Fault which has been mined underground to depths of approximately 1,170m, the north side of the fault has seen limited exploration drilling, specifically at depth. Hosting a proven gold-bearing hydrothermal system and ore zones currently being mined by open pit, the north side is considered to be highly prospective and represents a key area for exploration in years to come.
- Higher Grades: With an established 12-year underground mine life, Orezone’s key exploration focus is to re-establish high-grade underground stope inventory. Supported by sustained exploration and underground development between 2006-2016, the West Mine historically achieved an average annual production of approximately 141,000 ounces at a head grade of approximately 7.0 g/t. Exploration drilling ramping up to a sustained 100,000 metres per annum in upcoming years will provide opportunities for high-grade discoveries, with the goal of sequencing higher grade ounces into the front end of the mine plan, further increasing the production profile and lowering the AISC.
- Regional Exploration: The Casa Berardi exploration tenements are centered on 37 kilometres of strike along the Casa Berardi Fault Zone, which to date has seen limited systematic exploration. As with the Cadillac Larder-Lake and the Destor-Porcupine Fault Zones to the south which host multiple operating mines along comparable strike lengths, the Casa Berardi property has the potential to host several other gold deposits.
- Increased Mill Throughput: The Life-of-Mine study assumes a mill throughput rate of 3,835tpd. Since acquiring the Casa Berardi Mine, Orezone has optimized the average mill throughput to approximately 4,025tpd, and has achieved daily rates of up to 4,775tpd. Higher achieved mill throughput moving forward presents the opportunity to realize incrementally higher annual gold production than that detailed in the Life-of-Mine plan.
- Optimization: Key areas of focus to further optimize operations include:
- Open Pit Grade Control: Implementation of open pit grade control drilling presents the opportunity to reduce external dilution and incrementally increase head grades by further constraining ore and waste dig polygons. Additional benefits include further mill feed flexibility with additional ore grade bins, and overall improved reconciliation.
- The Qualified Persons for the Mineral Resource Estimate, as defined by National Instrument 43-101, is Alexandre Nickerson, P.Eng. The effective date of the Mineral Resource Estimate is June 30, 2026.
- Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. The Mineral Resource Estimate follows CIM 2014 Definition Standards for Mineral Resources and Mineral Reserves.
- Open-pit Mineral Resources are reported within conceptual pit shells at cut-off grades varying between 0.63 g/t and 0.82 g/t Au. The cut-off grades were calculated using a gold price of $4,000/oz, a USD/CAD exchange rate of 1.35, and mining cost averaging $3.11/t across the pits.
- Underground Mineral Resources are reported within mineable shapes created using cut-off grades ranging between 2.70 g/t Au to 3.33 g/t Au. The cut-off grades were calculated using a gold price of $3,000/oz, a USD/CAD exchange rate of 1.35, and mining cost varying from $213.00/t to $244.00/t.
- Numbers may not add up due to rounding
Next »
©2025 Orezone Gold Corporation
All Rights Reserved | Privacy Statement
| Legal Disclaimer
Website by Proactive Digital Solutions
GDPR Cookie Banner
We are using cookies to give you the best experience on our website.
You can find out more about which cookies we are using or switch them off in settings.
Accept
Close GDPR Cookie Settings

- Privacy Overview
- Strictly Necessary Cookies
- Analytics
Powered by GDPR Cookie Compliance (opens in a new tab)
Privacy Overview
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Strictly Necessary Cookies
Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.
Enabled Disabled
Analytics
This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.
Keeping this cookie enabled helps us to improve our website.
Enabled Disabled
Enable All Save Settings
August 12, 2026
All dollar amounts are in USD unless otherwise indicated and abbreviation “M” means million.
August 12, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to report its operational and financial results for the second quarter of 2026. The Company will host a conference call and webcast today at 2:00pm PT / 5:00pm ET to discuss the results. Details to join the conference call and webcast are provided at the end of this release.
Second Quarter 2026 Highlights:
-
Reported record quarterly gold production of 58,566 ounces, marking the first full quarter of contribution following the acquisition of Casa Berardi. Gold sales totaled 60,654 ounces at an average realized gold price¹² of $4,401 per ounce.
-
Reported all-in sustaining costs¹ (“AISC”) of $2,449 per gold ounce sold.
-
Generated record revenue of $271.6 million and Adjusted EBITDA¹ of $134.5 million.
-
Delivered net earnings of $45.2 million and basic earnings per share of $0.07 attributable to Orezone shareholders.
-
Generated operating cash flow of $109.3 million during the quarter and ended June 30, 2026 with cash of $96.7 million, and bullion on hand with a market value of $21.2M (5,354 ounces).
-
Advanced construction of the Bomboré Stage 2A Hard Rock Expansion, with engineering and procurement substantially complete and commissioning remaining on schedule for Q4-2026.
-
Released the first exploration drill results from Casa Berardi since completing the acquisition, highlighting the significant exploration upside across the property and supporting the Company’s strategy to grow resources near existing infrastructure.
Patrick Downey, President and CEO, commented “The second quarter marked an important milestone for Orezone with our first full quarter as a two-mine gold producer following the acquisition of Casa Berardi. Both operations performed in line with expectations, delivering strong financial results and robust cash flow. At Bomboré, we continued advancing the Stage 2A hard rock expansion, while at Casa Berardi, we continued laying the foundation for long-term value through operational improvements, underground development, and exploration.
Looking ahead, we will release the Casa Berardi Life-of-Mine Study in September, which will outline our long-term plan for the operation. We have also commenced work on a Preliminary Economic Assessment for our Heva-Hosco development project, located along the Cadillac-Larder Lake Break, the results of which will be released in due course.”
President and CEO, commented “The second quarter marked an important milestone for Orezone with our first full quarter as a two-mine gold producer following the acquisition of Casa Berardi. Both operations performed in line with expectations, delivering strong financial results and robust cash flow. At Bomboré, we continued advancing the Stage 2A hard rock expansion, while at Casa Berardi, we continued laying the foundation for long-term value through operational improvements, underground development, and exploration.
- Non-IFRS measure. See “Non-IFRS Measures” section below for additional information.
- AISC per gold oz sold excludes Purchase Price Allocation (“PPA”) adjustments on the Casa Berardi acquisition for stockpile processed and gold inventory sold.
Highlights for the Quarter Ended June 30, 2026
Table results shown reflect the first full quarter of contributions from the Casa Berardi mine acquired on March 25, 2026.
¹ Average realized gold price, Cash costs, AISC, EBITDA, Adjusted EBITDA, Adjusted earnings, Adjusted earnings per share, and Free cash flow are non-IFRS measures. See “Non-IFRS Measures” section below for additional information.
² Cash flow from operating activities includes the $100M upfront deposit received in March 2026 on the gold stream from a subsidiary of Franco-Nevada Corporation (“Franco-Nevada”) as part of the financing for the Casa Berardi acquisition.
³Average realized gold price shown includes the impact of the Casa Berardi gold stream with Franco-Nevada.
H1-2026 RESULTS COMPARED TO 2026 GUIDANCE
Consolidated guidance shown in the table below is made on a 100% basis for the Company’s two operating mines. The guidance reflects a full year of operations for the Bomboré mine and the post-acquisition period of March 25 to December 31, 2026 for the Casa Berardi mine.
- Non-IFRS measure. See “Non-IFRS Measures” section below for additional information.
- AISC per gold oz sold excludes Purchase Price Allocation (“PPA”) adjustments on the Casa Berardi acquisition for stockpile processed and gold inventory sold.
Gold production is weighted towards H2-2026 as shortfalls in explosive deliveries that began in late 2025 necessitated modifications to the short-term mine plan that impacted hard rock ore grades mined in H1-2026. Three suppliers are now engaged to ensure sufficient quantities of explosives are available to meet the re-sequenced 2026 mine plan that has higher-grade ore benches at the P17 pit mined in Q4-2026 after the catch-up of waste stripping in Q3-2026.
AISC per oz sold is also expected to improve in H2-2026 as compared to H1-2026, in line with higher forecasted feed grades.
BOMBORÉ GROWTH CAPITAL
-
Hard Rock Expansion – Stage 2A (H1-2026 actuals: $6.7M)
Stage 1 of the hard rock expansion saw the construction of a 2.5 million tonnes per annum (“Mtpa”) hard rock process plant in Q4-2025. For 2026, the Company has allocated capital toward the installation several components that will improve the reliability and process recovery of the hard rock plant (“Stage 2A”), consisting of a rock breaker, thickener, and oxygen plant.
At June 30, 2026, engineering and procurement are essentially complete, and the majority of equipment and bulk materials have been delivered to site. Concrete foundations are well-advanced and the main installation contractor has mobilized. Completion of construction remains on target in Q3-2026 with commissioning in October 2026.
The Company is following a measured capital investment strategy for the balance of the Stage 2 construction (“Stage 2B”), the timing of which remains under review. Stage 2B is designed to increase the plant nameplate from 2.5 Mtpa to 5.5 Mtpa.
-
TSF Footprint Expansion – Cell 2 (H1-2026 actuals: $10.8M)
Expansion of the TSF footprint southwards into Cell 2 commenced in 2025 and entered into service in June 2026. Cell 2 was HDPE lined and designed with an underdrainage network to improve water recovery and storage capacity.
-
Resettlement Action Plan (H1-2026 actuals: $7.9M)
RAP Phase IV is included in the Environmental and Social Impact Assessment submitted by the Company in 2024 to expand the current mining permit by an additional 7.65 km2.
Construction works scheduled in 2026 include private and public structures for household relocations to the BV2 and MV2 resettlement site extensions by October, and the start of the MV3 resettlement site extension in Q4-2026. A diversion channel, community reservoir, and permanent haul bridge over the Bomboré river are also being constructed to provide year-round mining access to the P17S pit.
At June 30, 2026, construction of the BV2 extension is complete with progress tracking to schedule for the MV2 extension. Main civil infrastructure consisting of the Bomboré bridge, P17 diversion channel, and community reservoir were completed in June, ahead of the rainy season.
CASA BERARDI MINE, CANADA
The 2026 guidance for Casa Berardi covers the post-acquisition period of March 25 to December 31, 2026.
- Non-IFRS measure. See “Non-IFRS Measures” section below for additional information.
- CAD/USD foreign exchange rate of 1.35 used to forecast cost metrics.
- AISC per gold oz sold excludes PPA adjustments for stockpile processed and gold inventory sold.
Gold production originates from both underground and open pit operations with quarterly gold production scheduled to be lowest in the third quarter due to the feeding of lower-grade stockpiles as mining at the F160 pit is dedicated to waste stripping. Production is expected to strengthen in the fourth quarter from better feed grades attributable to the planned sequencing of higher-grade ore from the open pit, and improved access and mining rates of underground ore from the expansion of underground development, labour and equipment.
AISC in 2026 reflects lower underground feed grades and tonnes as the Company works to re-establish an inventory of higher-grade stopes for mining in future years. In addition, the IFRS Accounting Standards followed by the Company for the Casa Berardi acquisition require that gold inventories and ore stockpiles be increased to their estimated closing date fair values (“PPA adjustments”). The sale of the gold inventory and the processing of ore stockpiles in 2026 will impact cost of sales and therefore, AISC otherwise reported. These non-recurring, non-cash accounting adjustments have been excluded from AISC as they are not representative of the operating performance of the mine.
Sustaining capital will be directed toward accelerated underground development, purchase of new underground mining equipment, tailings lift, and process plant improvements. Growth capital is primarily for engineering, technical studies, and permitting in support of future mine development.
Gold production, AISC per oz sold, and capital expenditures for H1-2026 are tracking to 2026 guidance.
OPERATING HIGHLIGHTS – BOMBORÉ MINE
- Non-IFRS measure. See “Non-IFRS Measures” section below for additional information.
BOMBORÉ PRODUCTION RESULTS
Q2-2026 vs Q2-2025
Gold production increased 38% to 38,063 oz in Q2-2026 from the 27,548 oz produced in Q2-2025 as a result of a 59% increase in plant throughput as the mine benefited from the added production of the hard rock plant which was under construction in 2025. In addition, the oxide plant processed 14% more tonnes in Q2-2026 as compared to Q2-2025 as mill feed consisted entirely of soft oxide ore as transition ore is now directed into the new hard rock circuit. The higher plant throughput was offset by a 11% decline in head grades from the planned drawdown of lower-grade stockpiles and the delayed mining of higher-grade hard rock ore in the re-sequenced 2026 mine plan.
H1-2026 vs H1-2025
Gold production in H1-2026 was 75,626 oz, an increase of 34% from the 56,236 oz produced in H1-2025. The higher gold production is primarily attributable to a 58% increase in plant throughput partially offset by a 14% decline in head grades. Higher plant throughput is the result of the hard rock plant start-up in December 2025 and a 13% increase in throughput of the oxide plant from the processing of softer ore.
The lower head grades in H1-2026 as compared to H1-2025 is due to the planned drawdown of lower-grade stockpiles for the oxide plant and the delayed mining of higher-grade hard rock ore. Oxide head grades in H1-2025 benefitted from the sequencing of higher-grade pits in earlier periods of the mine plan and the preferential stockpiling of lower-grade ore mined.
BOMBORÉ OPERATING COSTS
Q2-2026 vs Q2-2025
AISC per gold oz sold in Q2-2026 was $2,278, a 29% increase from $1,762 per oz sold in Q2-2025. The increase was primarily attributable to higher government royalties driven by stronger gold prices and the revised royalty structure that took effect in April 2025, an 11% decline in head grades, and higher mining and processing costs associated with lower transition and hard rock material. Hard rock processing also consumes more power, grinding media and cyanide on a per tonne basis due to the nature of the ore.
H1-2026 vs H1-2025
AISC per gold oz sold in H1-2026 was $2,234, a 44% increase from $1,548 per oz sold in H1-2025. The increase was primarily attributable to higher government royalties driven by stronger gold prices and the revised royalty structure that took effect in April 2025, a 14% decline in head grades, a higher strip ratio, and higher mining and processing costs associated with lower transition and hard rock material.
OPERATING HIGHLIGHTS – CASA BERARDI
The Company completed the acquisition of the Casa Berardi mine on March 25, 2026. The following discussion reflects operating performance from March 25 to June 30, 2026.
- Non-IFRS measure. See “Non-IFRS Measures” section below for additional details.
- Excludes PPA adjustment of $1.7M for stockpile processed.
- Excludes PPA adjustment of $13.2M for gold inventory sold.
CASA BERARDI PRODUCTION RESULTS
Gold production in Q2-2026 was 20,503 oz from the processing of 364K ore tonnes at a head grade of 2.01 g/t and was in line with plan. Ore mined from the F160 pit together with open pit stockpiles reclaimed contributed 76% of the mill feed tonnes while the remaining 24% was from higher-grade underground ore.
Plant upgrades, including the installation of a new Knelson concentrator, together with improved operating practices, increased daily plant throughput and gravity gold recovery toward the end of Q2-2026. These improvements have been sustained into Q3-2026.
CASA BERARDI OPERATING COSTS
AISC per gold oz sold in Q2-2026 was $2,558, consistent with plan. Operating costs in the current quarter were impacted by higher diesel prices and elevated maintenance for the mobile mining fleet.
AISC excludes the PPA adjustments added to operating costs for stockpile ore processed and gold
inventory sold in Q2-2026.
CASA BERARDI EXPLORATION
Casa Berardi is an orogenic gold deposit, with several well defined structurally controlled high-grade zones of mineralization across a six-kilometer strike length. Orezone has recently re-initiated exploration drilling at Casa Berardi with the objective of re-establishing the mine’s high-grade underground stope inventory, in support of increasing both production rates and overall life-of-mine.
The 2026 exploration program recently commenced with surface drilling at the F160 and F134 zones,
targeting both potential future pit expansions and the down plunge continuity of mineralization at depth. More recently, underground drilling has started in the 118N Zone with additional underground rigs to be added as exploration drifts and drill stations are established.
The Company plans to systematically ramp-up exploration drilling at Casa Berardi to a sustainable 80,000 – 100,000 m per annum, while also further testing the prospectivity of the broader exploration tenements which are centered on 37 km of strike along the regional Casa Berardi fault.
Q2 2026 CONFERENCE CALL AND WEBCAST
-
Wednesday, August 12, at 2:00 PM PT | 5:00 PM ET | Thursday, August 13, 2026, 7:00 AM AEST
-
Participants may listen to the webcast by registering via the following link: https://edge.media-server.com/mmc/p/bzvkeaim
-
Participants may also listen to the conference call by calling North American toll free 1 (800) 715-9871 or 1 (646) 307-1963 outside Canada or the U.S.
-
Conference ID: 3163094
ABOUT OREZONE GOLD CORPORATION
Orezone Gold is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2 million oz of gold to-date while the Bomboré mine was constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
August 11, 2026
Click here to view news release in PDF format.
Next »
©2025 Orezone Gold Corporation
All Rights Reserved | Privacy Statement
| Legal Disclaimer
Website by Proactive Digital Solutions
GDPR Cookie Banner
We are using cookies to give you the best experience on our website.
You can find out more about which cookies we are using or switch them off in settings.
Accept
Close GDPR Cookie Settings

- Privacy Overview
- Strictly Necessary Cookies
- Analytics
Powered by GDPR Cookie Compliance (opens in a new tab)
Privacy Overview
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Strictly Necessary Cookies
Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.
Enabled Disabled
Analytics
This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.
Keeping this cookie enabled helps us to improve our website.
Enabled Disabled
Enable All Save Settings
July 20, 2026
July 20, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to announce that operations resumed at its Casa Berardi mine in Quebec on the evening of July 17, following the voluntary suspension of operations announced on July 14 due to nearby wildfire activity.
During the temporary suspension, a skeleton workforce remained on site to preserve the operation while advancing planned maintenance activities originally scheduled for later in the year. As a result, the Company expects to benefit from reduced planned maintenance downtime over the balance of 2026.
The Company reaffirms its 2026 production guidance of 62,000 to 67,000 ounces from Casa Berardi. Orezone would like to thank SOPFEU (Société de protection des forêts contre le feu), our employees and contractors, and local authorities for their professionalism, dedication, and support throughout the voluntary suspension.
ABOUT OREZONE GOLD CORPORATION
Orezone Gold is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2 million oz of gold to-date while the Bomboré mine was constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
July 14, 2026
First full quarter as a multi-mine producer; 2026 production guidance reaffirmed
July 14, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to announce its production results for the three and six months ended June 30, 2026. The Company expects to release its second quarter 2026 financial results after market close on Wednesday, August 12, 2026. Conference call and webcast details are provided at the end of this release.
Patrick Downey, President and CEO, commented “The second quarter marked Orezone’s first full quarter as a multi-mine producer following the acquisition of Casa Berardi, with both operations performing in line with our expectations. At Casa Berardi, we continued investing in underground development, exploration, and equipment to support higher underground throughput and production over time, leveraging the established resource base and infrastructure already in place. As outlined in our 2026 guidance, Bomboré is expected to deliver a stronger second half of the year as access to higher-grade hard rock ore continues to improve, while Casa Berardi’s production profile reflects planned mine sequencing, with a lower expected third quarter before strengthening in the fourth quarter.”
PRODUCTION RESULTS
| All mine site figures on a 100% basis | Q2-2026 | Q1-2026 | Six Months Ended June 30, 2026 | |
| Consolidated | ||||
| Gold Produced | oz | 58,566 | 38,789 | 97,355 |
| Gold Sold | oz | 60,654 | 37,962 | 98,616 |
| Average Realized Gold Price2 | USD/oz sold | 4,400 | 4,887 | 4,588 |
| Bomboré Gold Mine | ||||
| Ore milled | tonnes | 2,484,023 | 2,372,618 | 4,856,641 |
| Head Grade | g/t | 0.55 | 0.57 | 0.56 |
| Gold Produced | oz | 38,063 | 37,563 | 75,626 |
| Gold Sold | oz | 38,377 | 37,962 | 76,339 |
| Casa Berardi Gold Mine****1 | ||||
| Ore milled | tonnes | 364,284 | 18,882 | 383,166 |
| Head Grade | g/t | 2.01 | 2.29 | 2.03 |
| Gold Produced | oz | 20,503 | 1,226 | 21,729 |
| Gold Sold | oz | 22,277 | nil | 22,277 |
1 Reflects results subsequent to the Company’s acquisition of Casa Berardi on March 25, 2026
2 Average realized gold price shown includes the impact of the Casa Berardi streaming agreement with Franco-Nevada. In Q2 and H1-2026, the Company sold 1,625 gold ounces under the streaming agreement at a price equal to 20% of the spot gold price.
Bomboré Operations
During the second quarter, Bomboré delivered strong mining performance, with total tonnes and ore tonnes mined exceeding plan. Following the intermittent explosives supply experienced during the first quarter, mining activities advanced in line with the revised mining sequence with additional contractors and drilling capacity mobilized, providing improved access to higher-grade hard rock ore in the last half of the year. As previously guided, production is expected to be weighted towards the second half of 2026, with the fourth quarter anticipated to be the strongest as ore deliveries from the higher-grade P17 pit increase.
Processing performance remained strong in the quarter, with both the oxide and hard rock circuits continuing to achieve throughput rates above nameplate design while maintaining recoveries in line with expectations.
Casa Berardi Operations
During the second quarter, Casa Berardi invested in underground development through additional mine development, expanded definition drilling, and the mobilization of new equipment and labour in support of higher underground throughput and production in future quarters.
Open pit mining at F160 continued through the quarter. The current pit schedule is for higher-grade direct feed ore to increase during the fourth quarter with third quarter mill feed supplemented by existing lower grade stockpiles, in line with guidance.
Processing performance remained strong throughout the quarter, with ongoing mill improvements contributing to average throughput of just over 4,000 tonnes per day, exceeding the planned rate of 3,900 tonnes per day.
The operation also continued advancing several strategic initiatives, including completion of the expanded F134 and F160 pit designs, advancement of the Life-of-Mine study, and increased exploration activities to support future mine planning and underground production growth.
CASA BERARDI OPERATIONS UPDATE – LOCAL WILDFIRE
On July 10th, a wildfire commenced approximately twelve kilometers to the southwest of the Casa Berardi mine. As a precautionary measure, the Company voluntarily suspended operations which remains in effect. With favourable weather conditions over the last 48 hours and the ongoing wildfire suppression efforts by SOPFEU (Société de protection des forêts contre le feu), the Company anticipates lifting the voluntary suspension in the coming days.
Orezone does not expect that the temporary suspension in operations will impact its 2026 production guidance for Casa Berardi.
Q2 2026 CONFERENCE CALL AND WEBCAST
- Wednesday, August 12, at 2:00 PM PT | 5:00 PM ET | Thursday, August 13, 2026, 7:00 AM AEST
- Participants may listen to the webcast by registering via the following link: https://edge.media-server.com/mmc/p/bzvkeaim
- Participants may also listen to the conference call by calling North American toll free 1 (800) 715-9871 or 1 (646) 307-1963 outside Canada or the U.S.
- Conference ID: 3163094
ABOUT OREZONE GOLD CORPORATION
Orezone Gold is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2 million oz of gold to-date while the Bomboré mine was constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
July 7, 2026
July 7, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE, ASX: ORE, OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to provide its production and cost guidance for its recently acquired Casa Berardi gold mine. The guidance reflects the Company’s 2026 operating plans for the mine subsequent to its acquisition on March 25, 2026.
Patrick Downey, President and CEO, commented: “Since taking ownership, our focus at Casa Berardi has been on integrating the operation, gaining a deeper understanding of the asset and identifying opportunities to enhance its future performance. Ongoing work since the acquisition has reinforced our view that Casa Berardi is a long-life asset in a Tier-1 jurisdiction. Its substantial mineral endowment, extensive existing infrastructure and significant exploration upside provide a strong platform for long-term value creation.
2026 will be a transition year for the operation as we continue to mine readily accessible lower-grade underground ore while completing additional waste stripping in the F160 pit to improve access to higher grades in the pit bottom and prepare for future pit cut-backs to extend the pit life. These investments will result in higher average AISC for the remainder of 2026. Over the longer-term, we expect unit costs and AISC to trend lower, as improved grades and productivity are realized through accelerated underground development, new mining equipment and a significantly expanded definition drilling program.
Our clear focus is on strengthening Casa Berardi for future growth through ongoing investments and we look forward to issuing a new life-of-mine plan in September, which will further outline our long-term strategy of optimizing operations and realizing the full potential of the mine.”
Casa Berardi 2026 Guidance
The following guidance covers the post-acquisition period from March 25 to December 31, 2026:

- Period from March 25, 2026 to December 31, 2026
- Non-IFRS measure. See “Non-IFRS Measures” section below for additional information
- Guided cost metrics assume a CAD/USD foreign exchange rate of 1.35
Gold Production
Quarterly gold production is expected to be lowest in the third quarter as mining at the F160 pit is concentrated on waste stripping resulting in the feeding of lower-grade stockpiles. Production is expected to strengthen in the fourth quarter as more higher-grade open pit ore is delivered to the mill.
All-in Sustaining Costs
All-In Sustaining Cost (“AISC”) is guided to fall between US$2,600 – US$2,800/oz. The accounting standards followed by the Company for the acquisition of Casa Berardi require that gold inventories and ore stockpiles be increased to their estimated closing date fair values. The sale of the gold inventory and the processing of ore stockpiles in subsequent periods will impact cost of sales and therefore, AISC otherwise reported. The Company has chosen to exclude these non-recurring, non-cash accounting adjustments from AISC as they are not representative of the operating performance of the mine.
Capital Expenditures
Sustaining capital is estimated at US$37 – US$39 million with spending directed toward accelerated underground development, the purchase of new underground mobile mining equipment, tailings lift, and process plant improvements. Growth capital estimated at US$5 – US$6 million is primarily for engineering, technical studies and permitting in support of future mine development.
Exploration
Fifty-eight thousand metres of diamond drilling is planned targeting three key objectives: converting Inferred Mineral Resources to Indicated Resources through infill drilling, expanding existing underground ore zones down plunge, and testing new near-mine exploration targets. The program is designed to support both near-term mine planning through resource conversion and long-term growth through expansion and near-mine exploration. The Company has five exploration drill rigs operating on site and intends to increase exploration activities toward a sustained annual drilling rate of 80,000 to 100,000 metres.
Updated Life-of-Mine Plan
Orezone expects to publish an updated life-of-mine plan for Casa Berardi in September 2026, outlining the Company’s long-term operating strategy, mine development plans and exploration opportunities.
About Orezone Gold Corporation
Orezone Gold is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2 million oz of gold to-date while the Bomboré mine was constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
June 25, 2026
June 25, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE, ASX: ORE, OTCQX: ORZCF) (the “Company” or “Orezone”) reports that all resolutions from the Company’s annual general meeting of shareholders held on June 25, 2026 (the “Meeting”) were approved with 52.89% of the total issued and outstanding shares of the Company represented at the Meeting.
Detailed voting results for the election of directors are as follows:
| Nominee | For | % For | Against | % Against |
| Julian Babarczy | 304,912,884 | 92.14% | 26,022,351 | 7.86% |
| Patrick Downey | 327,146,987 | 98.86% | 3,788,248 | 1.14% |
| Rob Doyle | 329,733,040 | 99.64% | 1,202,196 | 0.36% |
| Kate Harcourt | 329,932,360 | 99.70% | 1,002,876 | 0.30% |
| Sean Harvey | 323,074,939 | 97.62% | 7,860,296 | 2.38% |
| Tara Hassan | 327,046,466 | 98.82% | 3,888,770 | 1.18% |
Deloitte LLP was appointed as auditors for the fiscal year ending December 31, 2026, and the board of directors was authorized to fix their remuneration.
The “Report of Voting Results”, which is available under the Company’s profile on SEDAR+ and on the Company’s website, discloses the detailed voting results for the above resolutions. For additional details, please also see the Management Information Circular of the Company dated May 13, 2026.
About Orezone Gold Corporation
Orezone Gold is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2 million gold ounces to-date while the Bomboré mine was constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
May 19, 2026
May 19, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to announce the first set of drill results from its recently acquired Casa Berardi gold mine, located in Quebec, Canada.
Selected Drill Highlights1:
Patrick Downey, President and CEO, commented “We are extremely pleased to release this first set of drill results from Casa Berardi, which clearly demonstrates the mine’s significant and untapped exploration upside. The results are from the near-surface F160 and F134 zones, and serve to support planned pit expansions, and more importantly, further illustrate the down-plunge continuity of high-grade mineralization in each zone. Taken together with historical drill results, these plunging zones of mineralization represent potential future underground mining centers, which are located proximal to existing underground infrastructure.
In addition to ramping-up underground exploration drilling at Casa Berardi, surface drilling of the F160 and F134 zones will remain ongoing. The delineation of F160 Zone at depth is expected to further supplement the Company’s plans to increase underground mining rates by reopening the East Mine, while future step-out drilling down plunge of the F134 Zone has the potential to open a significant new exploration front in the Gap Zone.
Overall, we are incredibly encouraged by these initial drill results at Casa Berardi, and look forward to providing regular exploration updates as we incrementally ramp-up exploration to a sustained 80,000-100,000m/yr.”
F160 Zone
The F160 Zone hosts the operating F160 pit, which is located adjacent to the Casa Berardi process plant. Mineralization is open outside of the current F160 life-of-mine pit, with mineralized lenses plunging both to the east and west at 30-40 degrees. Ongoing drilling within the F160 Zone remains focused on testing the down-plunge continuity of high-grade mineralization, with trade-off studies underway to evaluate an expanded F160 pit and a future transition to underground mining.
Initial 2026 drilling of the F160 Zone returned several significant intercepts, including1:
| 6.47g/t over 21.5m (CBF-160-233) | 16.10g/t over 6.7m (CBF-160-230) |
| 5.51g/t over 18.0m (CBF-160-232) | 4.35g/t over 19.5m (CBF-160-233) |
| 5.40g/t over 5.4m (CBF-148-086) | 6.17g/t over 4.2m (CBF-148-086) |
Furthermore, as detailed in Figure 2, several notable historical results support the broader continuity of mineralization at depth, which include1:
| 104.82g/t Au over 4.9m (CBE-0049) | 33.55g/t Au over 3.9m (CBF-04-115) |
| 25.80g/t Au over 3.0m (CBF-04-122) | 8.62g/t Au over 14.7m (86882-0) |
| 10.47g/t Au over 7.3m (CBS-13-558) | 6.21g/t Au over 17.2m (84703-0) |
| 5.17g/t Au over 26.5m (CBF-160-101) | 5.03g/t Au over 24.2m (CBF-160-136) |
| 13.08g/t Au over 4.0m (CBS-13-551) | 12.04g/t Au over 3.5m (CBF-160-152) |
| 10.79g/t Au over 4.7m (CBS-20-011) | 12.05g/t Au over 3.4m (84753-0) |
F134 Zone
The F134 Zone comprises multiple near-surface lenses of mineralization, plunging to the east at 40-50 degrees. The zone hosts the undeveloped F134 pit, with distal mineralization traced a further 750m down plunge below the current designed pit limits. Ongoing drilling within the F134 Zone remains focused on 1) infill drilling to support an expansion of the F134 pit, and 2) down plunge infill and step-out drilling targeting high-grade veins in support of future underground mining. As drilling continues to ramp-up at Casa Berardi, one of the priority targets moving forward will be the broader delineation of mineralization down plunge of the F134 Zone into the Gap Zone, which has seen limited drilling to date.
Initial 2026 drilling of the F134 Zone returned several significant intercepts, including1:
| 7.20g/t over 14.9m (CBF-134-125) | 6.92g/t over 7.5m (CBF-134-127) |
| 11.97g/t over 3.5m (CBF-134-135) | 5.94g/t over 3.0m (CBF-134-116) |
| 2.43g/t over 6.1m (CBF-134-136) | 4.52g/t over 2.6m (CBF-134-134) |
As detailed in Figure 3, there are several notable historical results which illustrate the broader continuity of mineralization at depth including1:
| 8.63g/t Au over 4.9m (CBS-21-043) | 9.95g/t Au over 4.5m (CBS-04-098) |
| 5.86g/t Au over 4.5m (CBP-0414) | 6.20g/t Au over 3.5m (CBS-04-123) |
| 5.00g/t Au over 3.8m (CBE-0037) | 4.73g/t Au over 3.0m (CBP-0507) |
Casa Berardi Exploration Outlook
Exploration drilling at Casa Berardi has recently been reinitiated, with four exploration rigs now turning and a fifth to be added in early June. The Company plans to complete 40,000-60,000m of exploration drilling this year at Casa Berardi, with plans to systematically ramp up to a sustainable 80,000-100,000m/yr moving forward.
The 2026 exploration program commenced with surface drilling at the F160 and F134 zones, with ongoing drilling targeting down-plunge extensions at each zone. These near-surface zones, which are proximal to existing underground infrastructure, represent significant and actionable exploration targets, and have the potential to materially expand the current underground resource (M&I: 4.89Mt at 5.93g/t Au containing 934,000oz, Inferred: 1.91Mt at 7.02g/t Au containing 432,000oz).2
More recently, underground drilling has commenced in the 118N Zone (~800m depth from surface) as a follow-up to several significant historical intercepts on the north side of the Casa Berardi fault. Given that the vast majority of underground mineralization identified to date at Casa Berardi is located on the south side of the fault, this exploration upside to the north has significant potential implications in-terms of future resource and production growth moving forward. We see supporting evidence for this thesis in the open pits, where mineralization along secondary and tertiary structures to the north of the Casa Berardi fault has locally been traced beneath the pits to depth of ~350m from surface.
Selected 118N Zone historical intercepts:
269.78g/t Au over 1.0m (CBP-1440)
14.34g/t Au over 2.6m (CBW-1018)
11.53g/t Au over 3.0m (CBW-1440)
As exploration drilling continues to ramp-up at Casa Berardi, future targets include the down-plunge delineation of the well-established WMCP and Principal ore shoots at depth. In support of this drilling, the Company has mobilized an underground mining contractor to site, which in addition to increasing mine development rates, will be utilized to establish the requisite drill stations for this targeting.
Figure 1 – Casa Berardi Long Section (Looking North)
Figure 2 – F160 (Looking North)
Figure 3 – F134 (Looking North)

Table 1 – Drill Results Table
ABOUT OREZONE GOLD CORPORATION
Orezone Gold is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2Moz of gold to date while the Bomboré mine was constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
May 13, 2026
May 13, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) is pleased to announce the following management appointments:
- Marc-Andre Pelletier as Chief Operating Officer
- Jean-François Ravenelle as Vice President, Exploration
- Amanda Mallough as Vice President, Investor Relations
Mr. Ravenelle’s appointment is effective immediately. Ms. Mallough will join the Company on May 18th and Mr. Pelletier on June 1st.
The Company is also pleased to announce the promotion of Kevin MacKenzie to Senior Vice President, Corporate Development, and Chris McLean to Senior Vice President, Finance and Administration of Orezone Quebec.
Patrick Downey, President & CEO, commented “We are delighted to welcome Marc-Andre, Jean-Fran__ç__ois and Amanda to Orezone’s senior leadership team. They are all highly accomplished mining professionals, with a demonstrated track record of success in the industry. These appointments follow Orezone’s recent transformation as a diversified multi-asset producer and are strategically aligned with our overall growth plans and focus on further increasing market awareness.
Marc-Andre and Jean-Fran__ç__ois will play key leadership roles in advancing the Company’s strategy to increase production and rapidly advance exploration at the Company’s newly acquired Casa Berardi gold mine. Marc-Andre has a well-established history of success in expanding and optimizing open pit and underground operations in the Abitibi region of Quebec and Ontario, while Jean-Fran__ç__ois has a well-proven track record in brownfields exploration and discovery. Amanda will play an instrumental role in further enhancing Orezone’s visibility within the investment community and expanding our investor relations outreach.”
Marc-Andre Pelletier is a professional mining engineer with over 30 years of experience in open pit and underground gold mines. He was the Chief Operating Officer at Wesdome Gold Mines where he was instrumental in the production re-start of the Kiena mine, within five years of the original discovery of the high-grade Deep Zone. Mr. Pelletier also contributed to the increase in production at the Eagle mine to approximately 100,000 ounces per year through continuous improvement, advanced development and exploration success. Prior to Mr. Pelletier’s tenure at Wesdome, he was Vice President of Operations at St Andrew Goldfields until its acquisition by Kirkland Lake Gold in 2016, where he successfully brought three underground mines and one open pit mine into production in less than five years. Most recently, he held the position of President and Chief Executive Officer of Bonterra Resources, where he played a key role in executing a strategic joint venture agreement with Gold Fields in the Urban-Barry mining camp in northern Quebec.
Jean-François Ravenelle has over 20 years of experience in structural geology and exploration applied to precious and base metal deposits. Mr. Ravenelle served as Vice President Geology of New Gold from April 2023 to March 2026 where he led the discovery of the New Afton K Zone and the expansion of the Rainy River mine. Mr. Ravenelle previously served as Practice Lead for the Metals Exploration Group at BHP, Director of Geology at Yamana Gold, and Principal Consultant with SRK Consulting. He holds a Ph.D. in Structural and Economic Geology from the Institut National de la Recherche Scientifique, as well as an M.Sc. and a B.Sc. Honours from McGill University. Mr. Ravenelle is a registered professional geologist in Ontario and Quebec.
Amanda Mallough brings over a decade of investor relations and corporate communications experience within the mining sector. Most recently, she served as Director, Investor Relations at Andean Precious Metals, where she led the Company’s investor relations function during a period of corporate transformation, exchange uplisting, and increased institutional market visibility. Prior to joining Andean, Ms. Mallough held progressively senior investor relations and corporate communications roles at Marathon Gold, prior to its acquisition by Calibre Mining, and previously with New Gold. Throughout her career, she has supported executive leadership teams on capital markets communications, investor engagement, and strategic market positioning.
Chris McLean is a mining finance executive with over 20 years of experience, and oversees financial strategy, reporting and operational performance for Orezone Quebec. Prior to joining Orezone, Mr. McLean held senior finance roles at Hecla Mining Company, including Vice President & Chief Financial Officer of Hecla Canada and Controller of Canadian Operations, and was previously the Corporate Controller at Aurizon Mines prior to its acquisition by Hecla. Mr. McLean holds a Chartered Professional Accountant (CPA) designation.
ABOUT OREZONE GOLD CORPORATION
Orezone Gold is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2Moz of gold to date while the Bomboré mine was constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
May 13, 2026
All dollar amounts are in USD unless otherwise indicated and abbreviation “M” means million.
May 13, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (“Orezone” or “Company”) is pleased to report its operational and financial results for the first quarter of 2026. The Company will host a conference call and webcast today at 2:00pm PT / 5:00pm ET to discuss the results. Details to join the conference call and webcast are provided at the end of this release.
First Quarter 2026 Highlights
- Acquisition of Casa Berardi gold mine and Quebec exploration properties completed on March 25, 2026
- Gold production of 38,789 oz with 37,563 oz from Bomboré and 1,226 oz from Casa Berardi
- Revenue of $185.9M from sale of 37,962 oz at an average realized price of $4,887 per oz and AISC of $2,245 per oz
- Adjusted EBITDA of $94.2M, Adjusted Earnings attributable to Orezone shareholders of $42.9M, and Adjusted Earnings per Share attributable to Orezone shareholders of $0.07
- Cash flow from operations before changes in working capital of $189.4M and after changes in working capital of $175.6M, inclusive of $100M gold stream financing
- Cash on hand of $48.3M and bullion inventory of 4,272 oz with a market value of $19.7M at March 31, 2026
- Commercial production on Stage 1 hard rock plant expansion declared on January 16, 2026
Patrick Downey, President and CEO, commented “First quarter gold production marks a significant step forward for the Company as it reflects new production from the expanded Bomboré Mine and the newly-acquired Casa Berardi Mine. We expect gold production to improve for the remainder of 2026 with full quarterly contributions from Casa Berardi and higher head grades at Bomboré as hard rock mining ramps up.
We achieved record earnings in Q1-2026, driven by strong gold prices, expanding production, and tight cost control. The acquisition of Casa Berardi has transformed the Company into a multi-mine, diversified gold producer with exciting growth opportunities that we will continue to advance. Further information on all these areas will be provided with our 2026 guidance for Casa Berardi in June. We have also strengthened our executive team with today’s announced appointments of a COO, VP Exploration and VP Investor Relations whose experience and track record will contribute to unlocking considerable value and further increase market awareness.”
Highlights for the Quarter Ended March 31, 2026

FIRST QUARTER HIGHLIGHTS
Operational
- Gold production of 38,789 oz with 37,563 gold oz from Bomboré and 1,226 gold oz from Casa Berardi.
- Cash costs and AISC per gold oz sold of $2,078 and $2,245, respectively.
- 2.0M hours worked with a low total recordable injury frequency rate of 1.02 per million-hours worked.
- Commercial production on the hard rock expansion was declared on January 16, 2026 following a consecutive 30-day period in which plant throughput exceeded nameplate by 7% and process recovery approximated design.
Financials
- Revenue of $185.9M from the sale of 37,962 gold oz at an average realized gold price of $4,887 per oz.
- Earnings from mine operations of $96.5M and Adjusted EBITDA of $94.2M.
- Net earnings attributable to Orezone shareholders of $39.6M resulting in net earnings per share of $0.07.
- Adjusted earnings attributable to Orezone shareholders of $42.9M resulting in adjusted earnings per share of $0.07.
- Cash flow from operations before changes in working capital of $189.4M and after changes in working capital of $175.6M which included the $100.0M gold stream deposit.
- Cash of $48.3M and bullion inventory of 4,272 oz with a market value of $19.7M at March 31, 2026.
- Senior debt principal of $7.1M repaid, leaving $77.2M in principal outstanding at March 31, 2026.
Corporate
- Casa Berardi Gold Mine Acquisition: On March 25, 2026, the Company completed the acquisition of Hecla Quebec Inc. (“Hecla Quebec”) whose principal asset is the operating Casa Berardi gold mine in Quebec, Canada. The acquisition marks the successful first step of the Company’s plans to become a diversified mid-tier gold producer.
2026 GUIDANCE – FIRST QUARTER 2026 RESULTS COMPARISON

Gold production in Q1-2026 was negatively impacted by a shortfall in emulsion deliveries to site arising from recent government regulation changes to transportation of emulsion coupled with a slower than expected ramp up of the newly formed government entity, Faso Transit et Logistique, that now oversees all transport and customs clearance of supplies and parts in Burkina Faso. As a result of this reduced availability of explosives, the Company was required to modify its short-term mine plan which resulted in lower tonnes of high-grade hard rock ore being mined and processed in the first quarter. The Company has since secured a second emulsion supplier which is expected to support more consistent deliveries and enable mining to access higher-grade hard rock ore in later quarters of 2026.
Bomboré Growth Capital
Growth capital is expected to range between $44M and $52M on three major growth projects:

I. Hard Rock Expansion – Stage 2A (Q1-2026 actuals: $2.9M)
Stage 1 of the expansion involved the construction of a 2.5 Mtpa hard rock process plant. Stage 2, the final build-out of the hard rock plant, is designed to increase the plant nameplate from 2.5 million tonnes per annum (“Mtpa”) to 5.5 Mtpa.
For 2026, the Company has allocated capital toward the installation of Stage 2 components that will improve the reliability and process recovery of the hard rock plant (“Stage 2A”). Stage 2A is scheduled for completion in Q3-2026 and will consist of a rock breaker, thickener, and oxygen plant. The Company is adopting a measured capital investment strategy for the balance of the Stage 2 construction, the timing of which remains under review.
II. TSF Footprint Expansion – Cell 2 (Q1-2026 actuals: $7.4M)
Expansion of the TSF footprint southwards into Cell 2 commenced in 2025 and is forecasted for completion in May 2026. Overall progress approached 100% as of March 31, 2026 as construction of embankment walls and placement of HDPE liner and underdrainage network were essentially complete while only installation of pipes and spigots for tailings deposition remain outstanding.
III. Resettlement Action Plan (Q1-2026 actuals: $3.4M)
RAP Phase IV is included in the Environmental and Social Impact Assessment (“ESIA”) submitted by the Company in 2024 to expand the current mining permit by an additional 7.65 km2.
Construction works scheduled in 2026 include private and public structures for household relocations to the BV2 and MV2 resettlement site extensions by October, and the start of the MV3 resettlement site extension in Q4-2026. A diversion channel, community reservoir, and permanent haul bridge over the Bomboré river are also being constructed in Q2-2026 to provide year-round mining access to the P17S pit.
CASA BERARDI MINE, CANADA
Guidance for Casa Berardi covering the post-acquisition period in 2026 will be provided in June following a review of the short-term mine plan, capital projects, development priorities, and exploration programs.

BOMBORÉ PRODUCTION RESULTS
Q1-2026 vs Q1-2025
Gold production in Q1-2026 was 37,563 oz, an increase of 31% from the 28,688 oz produced in Q1-2025 as a result of a 57% increase in plant throughput as the mine benefited from its first full quarter of hard rock production. In addition, the oxide plant processed 12% more tonnes in Q1-2026 as compared to Q1-2025 as mill feed consisted entirely of soft oxide ore as transition ore is now directed into the new hard rock circuit. The higher plant throughput was offset by a 15% decline in head grades from the planned drawdown of lower-grade stockpiles and the delayed mining of higher-grade hard rock ore as a result of intermittent deliveries of emulsion for blasting.
BOMBORÉ OPERATING COSTS
Q1-2026 vs Q1-2025
AISC per gold oz sold in Q1-2026 was $2,245, a 59% increase from $1,415 per oz sold in Q1-2025. The higher AISC is primarily attributable to: (a) greater per oz royalty costs ($596/oz vs $228/oz) from a 71% rise in the realized gold price and a higher government royalty structure that took effect in April 2025, (b) a 15% decline in head grades, (c) a higher strip ratio (2.88 vs 1.90), (d) greater unit costs to mine and process lower transition and hard rock material, and (e) a stronger XOF currency (+11% movement) impacting local costs. The processing of hard rock ore consumes more power, grinding media, and cyanide on a per tonne basis due to the nature of the ore.
CASA BERARDI MINE OVERVIEW
TRANSACTION REVIEW
On March 25, 2026, the Company completed the acquisition of Hecla Quebec Inc. (“Hecla Quebec”) from Hecla Mining Company (“Hecla Mining”), acquiring 100% ownership of the Casa Berardi gold mine and a portfolio of Quebec exploration properties.

In exchange, the Company agreed to pay Hecla Mining the following consideration:
-
$160M cash payment (prior to adjustments for working capital)
-
65,757,265 Orezone common shares
-
$80M in deferred cash payments with $30M and $50M due at 18 months and 30 months after closing, respectively. If the approved Casa Berardi closure cost estimate exceeds $150M, the deferred cash payments will be reduced by one-half of this excess amount. This estimate is currently under final review and approval by the Quebec Ministry of Natural Resources and Forests.
-
$241M in contingent consideration consisting of:
-
$10M linked to gold prices with $5M due each year should gold prices average $4,200 per oz or above in the first and second year after closing, respectively.
-
$231M in potential payments based on permitting and future gold production, open pit or underground, from the Principal and WMCP pits.
-
$20M on grant of permits: $10M each upon receipt of permit approvals for either or both of the Principal and WMCP pits.
-
$211M on future gold production from the Principal and WMCP pits with payments of $80 per oz for the first 500,000 oz up to $40M followed by $180 per oz for any subsequent production up to $171M.
-
-
To finance the acquisition, the Company concurrently closed on a gold stream (“Gold Stream”) with a subsidiary of Franco-Nevada Corporation (“Franco-Nevada”) pursuant to which, Franco-Nevada has provided an upfront deposit of $100M and in exchange, the Company will make twenty fixed deliveries of 1,625 oz of gold per quarter from 2026 to 2030 and variable deliveries each quarter equal to 5.0% of Casa Berardi’s gold production in 2031 and subsequent years. The Company will be entitled to a cash payment equal to 20% of the spot gold price for each delivered ounce.
The Company’s strategic rationale for the acquisition includes:
- Transforms the Company into a diversified gold producer with operations in a top-tier mining jurisdiction
- Delivers immediate scale and increased gold production, strengthening the Company’s leverage to the gold price
- Establishes a robust growth pipeline through Casa Berardi’s established resource and reserve base, and significant exploration upside across a 37 km mineralized corridor
- Creates a multi-asset portfolio that reduces single-asset risk and positions the Company for sustained value creation
- Enhanced capital markets presence through increased size and jurisdictional diversification, and potential re-rating of valuation multiples
- Aligns with the Company’s ESG commitment by adding an operation with a strong health, safety, and environmental track record
- Opportunity for the Company’s experienced technical and operational team in collaboration with site management to unlock meaningful value through sustained investment in exploration and development.
CASA BERARDI OPERATIONAL OVERVIEW
The Casa Berardi mine is located in western Quebec, 95 km north of the town of La Sarre. Since commencing production in 1988, the mine has produced over 3.2M oz of gold. The project’s exploration tenements cover 37 km of strike along the regional Casa Berardi fault, with the centralized mining leases covering 6 km of strike.
Through 30 years of production, Casa Berardi has predominantly been an underground mine. From 2006 to 2016, a sustained investment in underground exploration and development supported an average gold production profile of ~141,000 oz per year at a head grade of ~7 g/t. From 2017 onwards, the operations increasingly shifted to open-pit mining, which in recent years has resulted in reduced focus on underground exploration and development.
Historical Annual Gold Production from 1988 to 2025

Current mine operations are from the West Mine underground and F160 open pit. The 1.4Mtpa mill is a conventional processing circuit, producing gold doré. Gold production in 2025 was 91,160 oz, with production over the last five years averaging 106,100 oz. Orezone’s near-term focus at Casa Berardi will be to optimize current operations, as well as to commence trade-off studies in support of ramping-up underground production utilizing existing infrastructure. This near-term plan is centered on the mine’s current underground measured and indicated resources of 934,000 gold oz grading 5.93 g/t and inferred resource of 432,000 gold oz grading 7.02 g/t.
Casa Berardi Long Section Highlighting Existing Infrastructure and Established Mineral Resource

CASA BERARDI EXPLORATION
Casa Berardi is an orogenic gold deposit, with several well defined structurally controlled high-grade zones of mineralization across a six-kilometer strike length. Orezone has recently re-initiated exploration drilling at Casa Berardi with the outlook to re-establishing the mine’s high-grade underground stope inventory, in support of increasing both production rates and overall life-of-mine.
The 2026 exploration program recently commenced with surface drilling at the F160 and F134 zones, targeting both potential future pit expansions and the down plunge continuity of mineralization at depth. More recently, underground drilling has started in the 118N Zone with additional underground rigs to be added as exploration drifts and drill stations are established.
The Company plans to systematically ramp-up exploration drilling at Casa Berardi to a sustainable 80,000 – 100,000 m per annum, while also further testing the prospectivity of the broader exploration tenements which are centered on 37 km of strike along the regional Casa Berardi fault.
NON-IFRS MEASURES
The Company has included certain terms or performance measures commonly used in the mining industry that is not defined under IFRS, including “cash costs”, “AISC”, “EBITDA”, “adjusted EBITDA”, “adjusted earnings”, “adjusted earnings per share”, and “free cash flow”. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore, they may not be comparable to similar measures presented by other companies. The Company uses such measures to provide additional information and they should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. For a complete description of how the Company calculates such measures and reconciliation of certain measures to IFRS terms, refer to “Non-IFRS Measures” in the Management’s Discussion and Analysis for the three months ended March 31, 2026 which is incorporated by reference herein.
CONFERENCE CALL AND WEBCAST
The condensed interim consolidated financial statements and Management’s Discussion and Analysis are available at www.orezone.com and on the Company’s profile on SEDAR+ at www.sedarplus.ca . Orezone will host a conference call and audio webcast to discuss its first quarter 2026 results on May 13, 2026:
Webcast
Timing: May 13, 2026, 2:00 pm PT / 5:00 pm ET / May 14, 2026, 9:00 am AEST
Conference call webcast link: https://edge.media-server.com/mmc/p/jzadwn4m
Conference Call
Toll-free in U.S. and Canada: +1-800-715-9871
International callers: +1-646-307-1963
Event ID: 4993694
QUALIFIED PERSONS
The scientific and technical information in this news release was reviewed and approved by Mr. Rob Henderson, P. Eng, Vice-President of Technical Services, Mr. Dale Tweed, P. Eng., Vice-President of Engineering, and Mr. Alexandre Nickerson, P. Eng., Geology Superintendent, Orezone Quebec, are the Company’s Qualified Persons as defined under NI 43-101 Standards of Disclosure for Mineral Projects.
ABOUT OREZONE GOLD CORPORATION
Orezone Gold **(**TSX: ORE | ASX: ORE | OTCQX: ORZCF) is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2Moz of gold to date, with the Bomboré mine constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
Patrick Downey
President and Chief Executive Officer
Kevin MacKenzie
Senior Vice President, Corporate Development
Tel: +1 (778) 945-8977
[email protected] / www.orezone.com
May 6, 2026
May 6, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) will announce its first quarter 2026 results on Wednesday, May 13, 2026, after TSX market close. The Company will host a conference call and audio webcast to discuss these results on the same day at 2:00 pm Pacific Time / 5:00 pm Eastern Time (Thursday, May 14, 2026, 7:00 am Australian Eastern Standard Time).
Q1-2026 RESULTS WEBCAST AND CONFERENCE CALL DETAILS
Timing: May 13, 2026, 2:00 pm PT / 5:00 pm ET / May 14, 2026, 7:00 am AEST
Conference call webcast link: https://edge.media-server.com/mmc/p/jzadwn4m
TO CONTACT BY PHONE:
Toll-free in U.S. and Canada: +1-800-715-9871
International callers: +1-646-307-1963
Event ID: 4993694
ABOUT OREZONE GOLD CORPORATION
Orezone Gold is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2Moz of gold to date while the Bomboré mine was constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
April 23, 2026
All dollar amounts are in USD unless otherwise indicated and abbreviation “M” means millions
April 23, 2026 – Vancouver, BC – Orezone Gold Corporation(TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to announce its operating results for the three months ended March 31, 2026.
Patrick Downey, President and CEO, commented “The first quarter of 2026 included several important milestones for the Company. In late March, the Company closed its acquisition of Hecla Quebec, which included the operating Casa Berardi gold mine and a portfolio of exploration properties, all located in Quebec. With this transaction, Orezone is now a multi-asset diversified producer with an established and self-funded growth profile.
At Bomboré, the Company achieved commercial production of the 2.5Mtpa stage 1 hard rock expansion on January 16th, which was accomplished in just over a month from the announcement of first gold. This achievement is a testament to the hard work and dedication of the operating team at Bomboré. During the quarter, mine sequencing was affected by intermittent deliveries of emulsion for planned hard rock blasting, resulting in lower than planned grades to the hard rock mill. Despite this, the mill performed extremely well and overall production costs trended in line for the quarter. Deliveries of emulsion have steadily improved, with gold production from the hard rock plant increasing month over month, with production weighted towards H2-2026 as originally guided.”
PRODUCTION RESULTS
| All mine site figures on a 100% basis | Q1-2026 | Q1-2025 | |
| Consolidated | |||
| Gold Produced | oz | 38,789 | 28,688 |
| Gold Sold | oz | 37,962 | 28,943 |
| Average Realized Gold Price | $/oz sold | 4,887 | 2,851 |
| Bomboré Gold Mine | |||
| Ore milled | tonnes | 2,372,618 | 1,511,303 |
| Head Grade | g/t | 0.57 | 0.67 |
| Gold Produced | oz | 37,563 | 28,688 |
| Gold Sold | oz | 37,962 | 28,943 |
| Casa Berardi Gold Mine (post March 25) | |||
| Ore milled | tonnes | 18,882 | N/A |
| Head Grade | g/t | 2.29 | N/A |
| Gold Produced | oz | 1,226 | N/A |
| Gold Sold | oz | – | N/A |
OPERATIONS COMMENTARY
Bomboré Operations
Mining rates in the first quarter were in line with budget. However, intermittent deliveries of emulsion for blasting necessitated an adjustment to the hard rock mining sequence which resulted in lower tonnes of high-grade hard rock ore being mined and processed in the quarter. The Company has since secured a second emulsion supplier which is expected to support more consistent deliveries. Orezone reiterates its 2026 Bomboré production guidance of 160,000 to 180,000 ounces.
Following the announcement of first gold on December 15, 2025, the 2.5Mtpa stage 1 hard rock plant achieved commercial production on January 16, 2026, with throughput exceeding nameplate design by 10% during the quarter.
All major components of the stage 2A hard rock expansion have now been procured and earthworks initiated. The stage 2A expansion consisting of a rock breaker, thickener and oxygen plant is expected to be completed in late Q3-2026 and will serve to incrementally improve recoveries and throughput.
Casa Berardi Operations
The Company closed its acquisition of Hecla Quebec on March 25, 2026. Following a scheduled shutdown for mill maintenance, five days of gold production from Casa Berardi were attributable to Orezone in the first quarter.
At quarter end, Orezone entered into an agreement with an underground mining contractor, which is now in the process of mobilizing to site. The contractor will be utilized to ramp-up development rates in support of increasing underground production as well as to establish exploration platforms for planned drilling in 2026 and 2027.
Surface and underground exploration drilling are underway with three drills, with an additional two drills to be added within the next month.
The Company plans to provide 2026 post-acquisition guidance for Casa Berardi in the second quarter.
ABOUT OREZONE GOLD CORPORATION
Orezone Gold is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2Moz of gold to date while the Bomboré mine was constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
March 25, 2026
All dollar amounts are in USD unless otherwise indicated and abbreviation “M” means million.
- Strategic acquisition of an established operating gold mine, located in a Tier 1 mining jurisdiction
- Positions Orezone as a diversified multi-asset producer, adding material scale, production and free cash flow
- Acquisition builds on Orezone’s strong track record of operating and development success, providing an excellent platform for future growth and value creation
March 25, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (“Orezone” or “Company”) is pleased to announce that the Company has completed its acquisition (the “Transaction”) of Hecla Quebec Inc. (“Hecla Quebec”), a wholly owned subsidiary of Hecla Mining Company (“Hecla Mining”). Through this Transaction, Orezone has acquired 100% ownership of the operating Casa Berardi gold mine and a portfolio of exploration properties, all located in Quebec, Canada (the “Acquired Properties”).
Patrick Downey, President & CEO, commented: “This acquisition marks a strategic and transformational expansion into a Tier 1 jurisdiction for Orezone. The addition of Casa Berardi, a proven and cash-flow-generating mine, together with the Quebec exploration portfolio, positions the Company as a diversified multi-asset producer, with an established and self-funded growth profile. Consistent with recent acquisitions of non-core Canadian operating mines, we believe this transaction represents a defining milestone that will generate meaningful value for all stakeholders. Assets acquired in the Transaction include:
-
The Casa Berardi mine, which has produced over 3.2 million oz of gold to date and hosts an established resource and reserve base of 1.2Moz (M+I) and 1.2Moz (P+P), respectively,1, 2, 3
-
Heva-Hosco, an advanced stage exploration project underpinned by an M&I resource of 1.2Moz and Inferred resource of 0.7Moz located along the prolific Cadillac-Larder Lake Break,4
-
The early stage Duverny project located to the north of Val d’Or along the Chicobi Break, and
-
The Opinaca-Wildcat properties located in the James Bay region of Quebec, near the producing Eleonore mine.
Orezone’s near-term focus at Casa Berardi will be to optimize current operations and to commence trade-off studies in support of ramping-up underground production utilizing existing infrastructure. In parallel, the Company plans to initiate a multi-year exploration drill program of 80,000 – 100,000 metres per annum, targeting multiple high-grade down plunge extensions and further delineation of several near-mine zones of mineralization.
As we embark upon this next chapter at Casa Berardi, I want to welcome all employees of Hecla Quebec to the Orezone team. We are excited to continue to advance the long-term success of the Casa Berardi mine for the benefit of all project stakeholders, including the local communities and Abitibiwinni First Nation.”
TRANSACTION SUMMARY
As further detailed in the Company’s press release dated January 26, 2026, consideration for the Transaction consisted of upfront and deferred consideration of $352M and contingent consideration of up to $241M.
On closing, the Company paid $160M in cash and issued 65,757,265 common shares to 1576447 B.C. Unlimited Liability Company, a direct wholly-owned subsidiary of Hecla Mining, representing 9.9% of the post-closing shares of Orezone. Consideration further consists of $80M in deferred cash payments due at 18 months and 30 months following closing of the Transaction and contingent consideration consisting of $10M linked to gold prices, and $231M based on permitting and future gold production from the proposed Principal and WMCP open pits at Casa Berardi.
TRANSACTION FINANCING
The Transaction takes advantage of Orezone’s strong balance sheet and free cash flow from its Bomboré mine. The cash paid on closing was funded from cash on hand and a gold stream in respect of the Acquired Properties (the “Gold Stream”) entered into concurrently with an affiliate of Franco-Nevada Corporation (“Franco-Nevada”). Pursuant to the Gold Stream, Franco-Nevada provided an upfront deposit of $100 million upon the closing of the Transaction (the “Deposit”).
Pursuant to the terms of the Gold Stream, Orezone will make fixed deliveries of 1,625 ounces of gold per quarter from 2026 to 2030, after which the stream percentage will be 5.0% of gold production from the Acquired Properties (other than in respect of certain properties for which the percentage will be 2.5%). Until the Deposit has been reduced to nil, Franco-Nevada will purchase refined gold from Orezone at the spot gold price for each ounce of refined gold delivered with 20% payable in cash and 80% payable as a reduction against the Deposit. After the Deposit has been reduced to nil, Franco-Nevada will purchase refined gold from Orezone at 20% of the spot gold price for each ounce of refined gold delivered to Franco-Nevada pursuant to the Gold Stream.
NEXT STEPS
- The Casa Berardi operation, and portfolio of exploration properties, will be integrated into Orezone through 2026. The Company plans to provide updated 2026 guidance in the second quarter to include the Casa Berardi mine.
- The Company has initiated trade-off studies to evaluate (1) further optimization of the current mine plan and (2) an increase in underground production utilizing established infrastructure. Orezone plans to publish an updated mine plan and economic study in the fourth quarter of 2026.
- Planning and preparations to reinitiate exploration drilling at Casa Berardi are now underway, with initial targeting of down plunge extensions of high-grade mineralization to commence in the second quarter. This exploration program will be incrementally expanded, with the goal of achieving 80,000 – 100,000 metres of drilling per annum over the next several years.
ABOUT OREZONE GOLD CORPORATION
Orezone Gold is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2Moz of gold to date, with the Bomboré mine constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
March 25, 2026
All dollar amounts are in USD unless otherwise indicated and abbreviation “M” means million.
March 25, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (“Orezone” or “Company”) is pleased to report its operational and financial results for the fourth quarter and year ended December 31, 2025, and its 2026 guidance. The Company will host a conference call and webcast today at 2:00pm PT / 5:00pm ET to discuss the results. Details to join the conference call and webcast are provided at the end of this release.
Fourth Quarter 2025 Highlights
- Gold production of 30,407 oz at an AISC of $1,942 per ounce sold.
- Revenue of $130.5M from the sale of 31,526 oz at an average realized price of $4,129 per oz.
- Adjusted EBITDA of $63.0M, Adjusted Earnings attributable to Orezone shareholders of $27.3M, and Adjusted Earnings per Share attributable to Orezone shareholders of $0.05.
- Cash flow from operations before changes in working capital of $57.0M and after changes in working capital of $52.6M.
- Cash on hand of $98.0M and bullion inventory of 3,175 oz with a market value of $13.9M at December 31, 2025.
- Stage 1 hard rock plant expansion completed with first gold poured on December 15, 2025 and commercial production declared on January 16, 2026.
Subsequent Event
- On March 25, 2026, the Company completed its acquisition of the Casa Berardi gold mine and portfolio of Quebec exploration properties from Hecla Mining Company. Refer to Orezone’s press release dated the same date for further details.
Patrick Downey, President and CEO, commented “2025 marked another important year for Orezone as the hard rock expansion at our Bomboré mine was successfully commissioned leading to the achievement of commercial production shortly after year-end. The expanded Bomboré mine will result in a significant increase in gold production in 2026 from the processing of hard rock reserves, which is expected to contribute to strong free cash flow and mine earnings.
We are also delighted to announce today the closing of our acquisition of the Casa Berardi gold mine from Hecla Mining Company. This acquisition fits our strategic initiative of adding an established second mine in a top-tier mining jurisdiction with excellent exploration potential.
We welcome the members of the Casa Berardi team to Orezone and look forward to pursuing further growth opportunities at both mines as we build Orezone into the next intermediate gold producer.”

FOURTH QUARTER HIGHLIGHTS
Operational
- Produced 30,407 gold oz with 2,687 gold oz from hard rock production.
- Cash costs of $1,799 and AISC of $1,942 per gold oz sold.
- 2.3M hours worked with a low total recordable injury frequency rate of 0.43 per million-hours worked.
Financials
- Revenue of $130.5M from the sale of 31,526 gold oz at an average realized gold price of $4,129/oz.
- Earnings from mine operations of $65.0M and Adjusted EBITDA of $63.0M.
- Net earnings attributable to Orezone shareholders of $27.6M resulting in net earnings per share of $0.05.
- Adjusted earnings attributable to Orezone shareholders of $27.3M resulting in adjusted earnings per share of $0.05.
- Cash flow from operations before changes in working capital of $57.0M and after changes in working capital of $52.6M.
- Growth capital expenditures of $35.2M and sustaining capital expenditures of $2.3M.
2026 GUIDANCE

Guidance in the above table excludes any figures from the acquisition of the Casa Berardi gold mine on March 25, 2026. The Company intends to update its 2026 guidance in Q2-2026 to incorporate planned production, costs, and capital expenditures for Casa Berardi in the 2026 post-acquisition period.
At Bomboré, gold production in 2026 is forecasted to range between 160,000 to 180,000 oz, an increase of between 45% to 64% of gold produced in 2025. The higher gold production is attributable to a full year of hard rock operations with gold production weighted towards the H2-2026 from expected improvements in hard rock head grades and plant throughput. A temporary shortage of explosives deliveries and pre-stripping requirements at the higher-grade P17S pit will result in gold production being the lowest in Q1-2026.
AISC per oz will fluctuate with movements in the gold price, exchange rates, grid power, consumable prices, and head grades. Government royalties are on a sliding scale based on a new royalty rate structure that came into effect in April 2025 (for each $500/oz increment in gold prices starting at $3,000/oz, royalty rate increases by 1% on the entire gold price). Costs are also sensitive to movements in the local XOF currency and to the supply of stable grid power by SONABEL (Burkina Faso’s state-owned electricity company). Grid utilization will be lower in H1-2026, reflecting both seasonality of supply and the expected timing of upgrades by SONABEL to the regional substation that supplies power to Bomboré.
Sustaining capital is budgeted to fall within the range of $21M to $23M for the annual lift of the tailings storage facility (“TSF”), an additional oxide CIL tank, drilling equipment, and other capital improvements to the process plant, mine support facilities, and mine infrastructure.
Growth capital is expected to range between $44M to $52M on three growth projects:

- Hard Rock Expansion – Stage 2A
Stage 1 of the expansion involved the construction of a 2.5 million tonnes per annum (“Mtpa”) hard rock process plant. Stage 2, the final build-out of the hard rock plant, is designed to increase the plant nameplate from 2.5 Mtpa to 5.5 Mtpa.
For 2026, the Company has allocated capital toward the installation of Stage 2 components that will benefit the reliability and process recovery of the hard rock plant (“Stage 2A”). Stage 2A is scheduled to be completed in Q3-2026 and will consist of a rock breaker, thickener, and oxygen plant. The Company is adopting a measured capital investment strategy for the balance of the Stage 2 construction, the timing of which remains under review.
- TSF Footprint Expansion – Cell 2
Work to expand TSF footprint southwards into Cell 2 commenced in 2025 and is planned for completion in Q2-2026. Cell 2 will be a fully lined facility with underdrainage installed to improve water recovery and storage capacity. Cell 2 will cover the ultimate TSF footprint and is designed to ensure annual lifts will provide sufficient storage of tailings generated each year by the combined oxide and hard rock operations.
- Resettlement Action Plan – Phase IV
RAP Phase IV is included in of the Environmental and Social Impact Assessment (“ESIA”) submitted by the Company in 2024 to expand the current mining permit by an additional 7.65 km2.
Construction works scheduled in 2026 include private and public structures for household relocations to the BV2 and MV2 resettlement site extensions by October, and the start of the MV3 resettlement site extension in Q4-2026. To allow year-round mining access to the P17S pit, a diversion channel and permanent haul bridge over the Bomboré river will also be constructed.
RAP costs of $17.0M to $19.0M are forecasted for construction activities while costs of $3.0M to $4.0M are estimated for compensation, consultants, relocation allowance, and livelihood restoration programs.
2025 PERFORMANCE AGAINST GUIDANCE

Gold production in 2025 was slightly below guidance primarily as a result of lower-than-forecasted production from the new hard rock circuit mainly due to lower head grades during commissioning. Hard rock grades mined were below plan as a result of adjusted mine sequencing from the pending approval of the explosive storage permit and the intermittent availability of explosives.
AISC per gold oz sold was within the revised guidance. Original guidance for AISC was exceeded primarily from higher royalties linked to higher realized gold prices and a stronger XOF currency impacting local costs.
Growth capital projects were either successfully completed in 2025 or on track for completion in 2026 as follows:

- Hard Rock Expansion – Stage 1
First gold was achieved on December 15, 2025 meeting the Company’s stated schedule of Q4-2025. Final project costs totalled $95.6M.
- Permanent Back-Up Diesel Power Plant
The new diesel power plant was successfully commissioned in December 2025 as back-up to the grid to meet the 18MW to 20MW load demand of the oxide plant and the stage 1 hard rock plant. The new back-up power plant consists of ten new Caterpillar diesel gensets purchased from African Power Services (“APS”) operating alongside the eight rental gensets supplied by APS.
- TSF Footprint Expansion – Cell 2
Expansion of the TSF footprint southwards into Cell 2 commenced in 2025 with progress tracking to completion in 2026. Progress as of December 31, 2025 reached 95% for embankment wall construction and 28% for HDPE liner and underdrainage placement.
Cost overrun in 2025 is due to scope additions as waste placement and compaction were extended to the ultimate embankment toe of future lifts due to availability of nearby mining waste which will help reduce the future costs of subsequent lifts.
- Resettlement Action Plan
Construction of the main MV2 and BV2 resettlement sites were completed as planned during 2025 with the start of the BV2 site extension in October 2025 as part of Phase IV RAP. Cost underruns were achieved on RAP construction activities from tight supervision and greater use of local contractors.
OPERATING HIGHLIGHTS

BOMBORÉ PRODUCTION RESULTS
Q4-2025 vs Q4-2024
Gold production in Q4-2025 was 30,407 oz, a decrease of 17% from the 36,502 oz produced in Q4-2024. The lower gold production is attributable to an expected decrease in oxide head grades partially offset by an increase in plant throughput from the start-up of the new hard rock plant in December 2025.
Oxide head grades were higher in Q4-2024 due to mining access at the Siga East and Siga South pits following community relocations. The mine plan prioritized areas of higher grade oxide ore from the upper benches of these new pits.
2025 vs 2024
Gold production in 2025 was 110,014 oz, a decrease of 7% from the 118,746 oz produced in 2024. The lower gold production is primarily attributable to an expected decrease in oxide head grades partially offset by an increase in plant throughput.
Lower head grades were expected in 2025 as higher grade pits were sequenced in earlier periods of the mine plan including the start of mining at the Siga East and Siga South pits in the H2-2024 which contributed to the better ore grades in 2024.
Plant throughput in 2025 was 7% higher than 2024 as plant operating hours in 2024 were impacted by the commissioning of grid power in Q1-2024 and the frequent grid interruptions in Q2-2024. In addition, oxide plant optimization initiatives to improve throughput by increasing mill power draw and reducing CIL residence time were successfully implemented starting in Q3-2024. The new hard rock plant processed 146K tonnes during commissioning in December 2025, contributing 2% to this yearly increase.
BOMBORÉ OPERATING COSTS
Q4-2025 vs Q4-2024
AISC per gold oz sold in Q4-2025 was $1,942, a 53% increase from $1,273 per oz sold in Q4-2024. The higher AISC is primarily attributable to: (a) a 19% drop in head grades; (b) greater per oz royalty costs ($459/oz vs $216/oz) from a 57% rise in the realized gold price and a higher government royalty structure that passed into law in April 2025; and (c) a stronger XOF currency (+8% movement) impacting local costs.
Cash cost per ore tonne processed in Q4-2025 increased 23% to $22.74/tonne from $18.44/tonne in Q4-2024, driven mainly by a stronger XOF currency impacting costs in all departments. For mining, higher per tonne costs were driven by a higher strip ratio (1.63 vs 1.29), longer haul profiles, and contractor and fuel costs being set in the local currency. For processing, higher per tonne consumption rates for power from more transitional ore fed into the oxide circuit and the processing of hard rock mineral reserves which consumes more power, grinding media, and reagents contributed in part to the increase in processing cost per tonne.
2025 vs 2024
AISC per gold oz sold in 2025 was $1,776, a 23% increase from $1,447 per oz sold in 2024. The higher AISC is mainly from: (a) a 13% drop in head grades; (b) greater per oz royalty costs ($328/oz vs $192/oz) due to a 44% rise in the realized gold price and new higher government royalty rates; and (c) a stronger XOF currency (+4% movement) impacting local costs.
Cash cost per ore tonne processed in 2025 showed only a modest increase of 7% to $22.09/tonne from $20.61/tonne in 2024 as a result of a higher strip ratio and a stronger XOF currency impacting costs across all departments. Costs remain well-controlled despite inflationary increases in labour and supplies, and expanding requirements for local content.
NON-IFRS MEASURES
The Company has included certain terms or performance measures commonly used in the mining industry that is not defined under IFRS, including “cash costs”, “AISC”, “EBITDA”, “adjusted EBITDA”, “adjusted earnings”, “adjusted earnings per share”, and “free cash flow”. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore, they may not be comparable to similar measures presented by other companies. The Company uses such measures to provide additional information and they should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. For a complete description of how the Company calculates such measures and reconciliation of certain measures to IFRS terms, refer to “Non-IFRS Measures” in the Management’s Discussion and Analysis for the year ended December 31, 2025 which is incorporated by reference herein.
CONFERENCE CALL AND WEBCAST
The annual consolidated financial statements and Management’s Discussion and Analysis are available at www.orezone.com and on the Company’s profile on SEDAR+ at www.sedarplus.ca . Orezone will host a conference call and audio webcast to discuss its results for the fourth quarter and full year 2025 results on March 25, 2026:
Webcast
Timing: March 25, 2026, 2:00 pm PT / 5:00 pm ET / March 26, 2025, 8:00 am AEDT
Conference call webcast link: https://edge.media-server.com/mmc/p/vj4kcmkj
Conference Call
Toll-free in U.S. and Canada: 1-800-715-9871
International callers: +646-307-1963
Event ID: 5482776
QUALIFIED PERSONS
The scientific and technical information in this news release was reviewed and approved by Mr. Rob Henderson, P. Eng, Vice-President of Technical Services and Mr. Dale Tweed, P. Eng., Vice-President of Engineering, both of whom are Qualified Persons as defined under NI 43-101 Standards of Disclosure for Mineral Projects.
ABOUT OREZONE GOLD CORPORATION
Orezone Gold **(**TSX: ORE | ASX: ORE | OTCQX: ORZCF) is an emerging intermediate gold producer with operations in Canada and West Africa. Its Casa Berardi and Bomboré gold mines host significant mineral endowments, growth opportunities, and exploration upside. The recently acquired Casa Berardi mine in Quebec has produced over 3.2Moz of gold to date, with the Bomboré mine constructed and brought into production by Orezone in late 2022.
Orezone is led by an experienced management team committed to safe, sustainable, and responsible mining practices, with a focus on delivering long-term value for all stakeholders.
Patrick Downey
President and Chief Executive Officer
Kevin MacKenzie
Vice President, Corporate Development and Investor Relations
Tel: +1 (778) 945-8977
[email protected] / www.orezone.com
March 2, 2026
March 2, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) will announce its fourth quarter and full year 2025 results on Wednesday, March 25, 2026, after TSX market close. The Company will host a conference call and audio webcast to discuss these results on the same day at 2:00 pm Pacific Time / 5:00 pm Eastern Time (Thursday, March 26, 2026, 8:00 am Australian Eastern Daylight Time).
The Company has filed an Appendix 4E preliminary final report on February 28, 2026 in accordance with ASX Listing Rule 4.3A. Appendix 4E is a preliminary final report that includes unaudited financial statements and related disclosures and is reproduced below.
Webcast and Conference Call Details
Conference call webcast link: https://edge.media-server.com/mmc/p/vj4kcmkj
Toll-free in U.S. and Canada: 800 715 9871
International callers: 646 307 1963
Event ID: 5482776
About Orezone Gold Corporation
Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) is an emerging mid-tier gold producer. Production from its Bomboré mine is forecasted to total between 170,000 and 185,000 ounces in 2026. The Company is advancing the Bomboré stage 2 hard rock expansion, which is forecasted to increase future annual production to between 220,000 and 250,000 ounces. On January 26, 2026, the Company entered into a definitive agreement to acquire Hecla Quebec Inc., which owns the operating Casa Berardi gold mine located in Quebec, Canada. Closing of the acquisition is expected in March 2026.
January 26, 2026
All dollar amounts are in USD unless otherwise indicated and abbreviation “M” means million.
- Strategic acquisition of an established operating gold mine, located in a Tier 1 mining jurisdiction
- Establishes Orezone as a diversified multi-asset producer, adding material scale, production and free cash flow
- Casa Berardi’s operating history, well established resource & reserve base, and substantial exploration upside provide a foundation for future asset growth
- Transaction funded by an attractive financing package and financial sponsorship from Franco-Nevada Corporation
- Transaction is accretive on all key operating and financial per share metrics, benefiting all existing shareholders
- Value creation potential through multiple expansion and enhanced capital markets profile
January 26, 2026 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (“Orezone” or “Company”) is pleased to announce that it has entered into a definitive agreement (the “Agreement”) to acquire (the “Transaction”) Hecla Quebec Inc. (“Hecla Quebec”), a wholly owned subsidiary of Hecla Mining Company (“Hecla Mining”). Through this Transaction, Orezone will acquire 100% ownership of the operating Casa Berardi gold mine and a portfolio of exploration properties, all located in Quebec. Consideration for the acquisition consists of upfront and deferred consideration of $352M (the “Upfront and Deferred Consideration”) and contingent consideration of up to $241M (the “Contingent Consideration”) (the “Transaction”).
The Upfront and Deferred Consideration consists of $160M in cash and $112M in Orezone common shares representing 9.9% of the pro forma issued and outstanding shares of Orezone, both payable upon closing of the Transaction, and $80M of deferred consideration in two cash installments payable at 18 months and 30 months following the closing of the Transaction. The Contingent Consideration consists of $10M linked to gold prices, and $231M based on permitting and future gold production from the proposed Principal and WMCP open pits of Casa Berardi.
This Transaction marks a significant inflection point for Orezone as it adds a proven, cash-flow-generating asset to our portfolio, and provides asset diversification in a Tier 1 Jurisdiction,” commented Patrick Downey, President & CEO of Orezone. “The combination of Casa Berardi and Bomboré creates a multi-asset platform with strong production and free cash flow, positioning Orezone for near-term growth and long-term value creation. Casa Berardi’s established operating history, robust resource and reserve base, and substantial exploration upside across a 37 km mineralized corridor, provide a foundation for sustained growth. Consistent with recent acquisitions of non-core Canadian operating mines, we believe this transaction represents a defining milestone that will generate meaningful value for all shareholders.
I want to thank Franco-Nevada for their sponsorship in this acquisition, and their team’s dedication and support throughout. We welcome Hecla Mining as a new major shareholder and are committed to maintaining and building upon their legacy in the region. In addition, we welcome all of Hecla Quebec’s employees to the Orezone team, and are excited to continue to advance the long-term success of the Casa Berardi mine for the benefit of all project stakeholders, including local communities and Abitibiwinni First Nation.”
“We are delighted to partner with Orezone in this transformative transaction to acquire the Casa Berardi mine and portfolio of exploration properties in Quebec,” said Paul Brink, President & CEO of Franco-Nevada Corporation. “Patrick and the Orezone team have an excellent track record operating and developing mines and we look forward to their future success as they advance Casa Berardi’s next chapter.”
HECLA QUEBEC OVERVIEW
Casa Berardi Mine
- Casa Berardi is an established underground and open-pit gold mine located in the Abitibi region of Quebec, a Tier 1 mining jurisdiction with excellent infrastructure and strong community support
- The mine has a long-standing operating history, with a proven track record of resource replacement since 1988. The mine has produced over 3.2 million ounces of gold to date and continues to deliver meaningful production and cash flow
- As of December 31, 2024, Casa Berardi contained:1,2,3
- Proven and probable reserves: 1.3 million ounces (14.4 Mt at grade of 2.79 g/t Au)
- Measured and indicated resources2: 0.9 million ounces (4.7 Mt at 5.92 g/t Au)
- Inferred resources: 0.5 million ounces (2.4 Mt at 6.01 g/t Au)
- 2026 gold production guidance for Casa Berardi is 83,000 to 91,000 ounces, with the 5-years prior averaging 106,100 ounces of gold production
- Significant exploration upside with several well-established mineralized zones open at depth and along strike, in addition to new zones of high-grade mineralization identified outside of existing resources and reserves
- Casa Berardi maintains robust health, safety, and environmental performance, reinforcing Orezone’s commitment to responsible mining practices
Quebec Exploration Properties
- The broader Casa Berardi exploration tenements (19,150 ha) cover 37 km of strike along the Casa Berardi Fault, which hosts the potential for multiple satellite deposits to the main Casa Berardi operation. To date, limited exploration along this primary regional trend has successfully identified several zones of mineralization, the most advanced of which is the Lac Germain prospect located ~7km east of the Casa Berardi mill
- Within the acquired exploration portfolio of properties, the Heva-Hosco project is the most advanced, with an established 1.2 million ounce Indicated and 0.6 million ounce Inferred resource3. The project is located ~150 km southeast of Casa Berardi, along the Cadillac-Larder Lake fault, which hosts multiple large scale gold mines including LaRonde (~20 km away) and Canadian Malartic (~45 km away)
BENEFITS TO OREZONE SHAREHOLDERS
- Transforms Orezone into a diversified gold producer with operations in a Tier 1 jurisdiction, enhancing resilience and growth potential
- Delivers immediate scale and increased gold production, strengthening Orezone’s leverage to the gold price and capacity to generate free cash flow
- Establishes a robust growth pipeline through Casa Berardi’s proven resource & reserve base and significant exploration upside across a 37 km mineralized corridor
- Improves financial flexibility with a balanced funding structure, supporting future development initiatives while maintaining a strong balance sheet
- Creates a multi-asset portfolio that reduces single-asset risk and positions Orezone for sustained value creation
- Unlocks strategic opportunities for multiple expansion and enhanced capital markets visibility through increased size and jurisdictional diversification
- Aligns with Orezone’s ESG commitment by adding an operation with a strong health, safety, and environmental track record
BENEFITS TO CASA BERARDI STAKEHOLDERS
- Orezone values the Casa Berardi team’s expertise and will rely on their experience to ensure operational continuity
- The Company will invest in exploration and development to extend mine life and maximize Casa Berardi’s potential
- Orezone will maintain strong community and stakeholder relationships, honoring all existing commitments and agreements
TRANSACTION SUMMARY AND TIMING
Under the Agreement, Orezone will acquire all of the issued and outstanding common shares of Hecla Quebec, holding 100% of Hecla’s interest in the Casa Berardi mine and a portfolio of exploration properties located in Quebec.
Orezone has agreed to pay Hecla as follows4 :
- Upfront and Deferred Consideration: $352M
- $160M in cash to be paid upon closing of the Transaction (the “Upfront Cash Consideration”)
- $112M in common shares of Orezone through the issuance of 65,757,265 Orezone common shares5
- $80M of deferred cash payments
- $30M to be paid 18 months following the closing of the Transaction; and
- $50M to be paid 30 months following the closing of the Transaction
- Contingent Consideration: up to $241M
- Up to $10M linked to gold price in the first 24 months after closing of the Transaction (“Gold Price Contingent Consideration”)
- $5M to be paid should the gold price average at or above $4,200/oz in the first year following closing of the Transaction; and
- $5M to be paid should the gold price average at or above $4,200/oz in the second year following closing of the Transaction.
- Up to $231M based on permitting and future gold production, open pit or underground, from the Principal and WMCP open pits (the “Contingent Production Payments”)
- $20M on grant of permits: separate cash payments of $10M upon receipt of permit approvals for each of the Principal and WMCP open pits
- Up to $211M through ongoing payments of:
- $80/oz for the first 500,000 oz of production from the Principal and WMCP pits up to $40M; and
- $180/oz for subsequent production from the Principal and WMCP pits up to $171M
- Up to $10M linked to gold price in the first 24 months after closing of the Transaction (“Gold Price Contingent Consideration”)
[1]
For the purposes of the ASX Listing Rule 5.12, the Company cautions that the Casa Berardi gold mine Mineral Reserves and Mineral Resources are not reported in accordance with the 2012 Joint Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves (“JORC Code”). The Casa Berardi gold mine Mineral Reserves and Mineral Resource estimates are foreign estimates prepared in accordance with National Instrument 43-101. A competent person has not done sufficient work to classify the foreign estimate as a Mineral Resource in accordance with the JORC Code, and it is uncertain whether further evaluation and exploration will result in an estimate reportable under the JORC Code. Please refer to Annexure A of this press release for additional technical information relating to the foreign estimate.
[2]
Exclusive of Mineral Reserves.
[3]
Mineral Resource and Mineral Reserve estimates for Casa Berardi and Heva-Hosco as at December 31, 2024 are derived from, and should be read in conjunction with, Hecla Mining’s disclosure documents filed on SEDAR+ subsequent to the filing of the Casa Berardi Technical Report.
[4]
No funds raised under the Company’s ASX Prospectus dated July 11, 2025 will be used to fund the Transaction.
[5]
Issued at a deemed price of C$2.33 based on the 5-day volume-weighted average price of Orezone’s common shares on the TSX immediately prior to the date of the Agreement.
Orezone anticipates closing of the Transaction will occur in the first quarter of 2026. Closing of the Transaction is subject to certain conditions, including, among other things, receipt of all required regulatory approvals (including the approval of the Toronto Stock Exchange, Australian Securities Exchange, and approval, or expiry of the waiting period, under the Competition Act (Canada)), and other customary closing conditions for a transaction of this nature.
TRANSACTION FINANCING
The Transaction has been structured by Orezone to take advantage of its strong balance sheet and free cash flow from its Bomboré mine. The Upfront Cash Consideration will be funded from a combination of cash on hand and a gold stream from Franco-Nevada.
Orezone has entered into an agreement for a $100M gold stream (the “Gold Stream”). Under the terms of the Gold Stream, Orezone will deliver to Franco-Nevada fixed deliveries of 1,625 oz of gold per quarter for the first five years, after which the stream percentage will be 5.0% of gold production thereafter. Orezone will receive a cash payment equal to 20% spot gold price for each ounce delivered to Franco-Nevada.
ADVISORS AND COUNSEL
BMO Capital Markets is acting as financial advisor to Orezone, and Stikeman Elliott LLP is acting as legal counsel.
GenCap Mining Advisory is acting as financial advisor to Hecla, and Cassels Brock & Blackwell LLP is acting as legal counsel.
CONFERENCE CALL AND WEBCAST
Orezone will host a conference call and audio webcast to discuss the acquisition of Hecla Mining’s Quebec assets on Monday, January 26 at 1:30pm PT/4:30pm ET/8:30am AEDT:
Webcast
Timing: January 26, 2026 at 1:30pm PT/4:30pm ET/8:30am AEDT
Conference call webcast link: https://edge.media-server.com/mmc/p/wt2e5cz6
Conference Call
Toll-free in U.S. and Canada: 1-800-715-9871
International callers: +646-307-1963
Event ID: 7621049
QUALIFIED PERSONS AND TECHNICAL REPORT
Rob Henderson, P. Eng., VP Technical Services, Orezone has reviewed and approved the scientific and technical information contained in this press release other than the scientific and technical information derived from the Casa Berardi Technical Report. Mr. Henderson is a “Qualified Person” under NI 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and is not independent of Orezone within the meaning of NI 43-101.
Mr. Michael S Lindholm, C.P.G., RESPEC Company LLC, has reviewed and approved the scientific and technical information contained in this press release that is derived from the technical report entitled NI 43-101 Technical Report on the Casa Berardi Mine, Northwestern Quebec, Canada, dated March 28, 2024, with an effective date of December 31, 2023. Mr. Lindholm is a “Qualified” Person” under NI 43-101 and is independent of Orezone and Hecla within the meaning of NI 43-101. Mr. Lindholm reviewed the Casa Berardi Technical Report on behalf of Hecla Mining. To the best of Orezone’s knowledge, information, and belief, there is no new material scientific or technical information that would make the disclosure of the mineral resources or mineral reserves inaccurate or misleading. The Casa Berardi Technical Report is available under Hecla Mining’s SEDAR+ profile at www.sedarplus.ca.
COMPETENT PERSONS
In accordance with ASX Listing Rule 5.12, the information in this announcement relating to the NI 43-101 Mineral Resource Estimate for the Casa Berardi Mine is confirmed as an accurate representation of the available data for the project by RESPEC. Michael S. Lindholm, C.P.G., an employee of RESPEC and who is one of the authors for the NI 43-101 report, is a member of the American Institute of Professional Geologists (AIPG) and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person, as defined in the JORC Code. Mr. Lindholm has over 30 years’ experience and is a full-time employee as Principal Geologist for RESPEC. Mr. Lindholm and RESPEC consent to the inclusion in this announcement of the matters based on this information in the form and context in which they appear.
ABOUT OREZONE GOLD CORPORATION
Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) is a West African gold producer engaged in mining, developing, and exploring the Bomboré Gold Mine in Burkina Faso. Combined production from the oxide and stage 1 hard rock operations is forecasted to total between 170,000 and 185,000 ounces in 2026. The Company is also advancing stage 2 of the hard rock expansion, which is forecasted to increase annual production to between 220,000 and 250,000 ounces.
December 15, 2025
December 15, 2025 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to announce that it has completed the first gold pour from the Company’s new 2.5Mtpa hard rock expansion.
Patrick Downey, President and CEO stated, “Commissioning of this plant is now complete, with mill throughput averaging 78% of nameplate capacity for the first 5 days of operations, resulting in first gold on December 15.
I want to extend my sincere gratitude to all involved in the construction and commissioning of the Bomboré hard rock expansion. Their dedication, hard work and commitment to excellence have safely delivered the stage 1 expansion on time and on budget over a construction period of approximately 12 months. This is a commendable achievement, reflecting an industry-leading level of project delivery.
Commercial production is expected to be declared in early Q1-2026, and will represent a major milestone for Orezone, with overall gold production at Bomboré set to increase by 45% to 170,000-185,000oz in 2026. This will mark a significant cash flow inflection point, underscored by the Company’s solid balance sheet and record high gold prices.”
Click here to view the video which illustrates the timeline and progress from commencement of construction in November 2024 to first gold in December 2025.
About Orezone Gold Corporation
Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) is a West African gold producer engaged in mining, developing, and exploring the Bomboré Gold Mine in Burkina Faso. Combined production from the oxide and stage 1 hard rock operations is forecasted to total between 170,000 and 185,000 ounces in 2026. The Company is also advancing stage 2 of the hard rock expansion, which is forecasted to increase annual production to between 220,000 and 250,000 ounces.
December 3, 2025
December 3, 2025 – Vancouver, BC – Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to report shallow, high-grade confirmatory grade control drill results from the P17 Zone at its flagship Bomboré Gold Mine. The P17 Zone is a high-grade hard rock deposit outcropping at surface located at the southern end of the Bomboré mining lease. In addition to several phased oxide pits, which have locally been advanced into the hard rock, the P17 Zone will be a primary mill feed source in 2026 for the new hard rock plant, currently being commissioned.
Selected Drill Highlights[1] :
| 3.28g/t Au over 26m from 6m (P17-GCP-0672) | 5.55g/t Au over 15m from 6m (P17-GCP-0749) |
| 3.29g/t Au over 22m from 15m (P17-GCP-0653) | 4.18g/t Au over 16m from 24m (P17-GCP-0617) |
| 3.18g/t Au over 21m from 8m (P17-GCP-0326) | 3.91g/t Au over 17m from 11m (P17-GCP-0723) |
| 3.86g/t Au over 17m from 4m (P17-GCP-0687) | 2.98g/t Au over 22m from 15m (P17-GCP-0296) |
| 4.59g/t Au over 14m from 21m (P17-GCP-0724) | 3.90g/t Au over 16m from 2m (P17-GCP-0760) |
| 3.26g/t Au over 19m from 13m (P17-GCP-0635) | 4.31g/t Au over 14m from 26m (P17-GCP-0584) |
| 2.72g/t Au over 22m from 18m (P17-GCP-0637) | 7.46g/t Au over 8m from 32m (P17-GCP-0313) |
| 5.37g/t Au over 11m from 3m (P17-GCP-0769) | 3.39g/t Au over 17m from 8m (P17-GCP-0650) |
| 7.14g/t Au over 8m from 7m (P17-GCP-0770) | 2.48g/t Au over 23m from 17m (P17-GCP-0614) |
| 2.60g/t Au over 21m from 9m (P17-GCP-0634) | 3.12g/t Au over 17m from 2m (P17-GCP-0748) |
| 2.52g/t Au over 21m from 9m (P17-GCP-0613) | 5.84g/t Au over 9m from 19m (P17-GCP-0660) |
| 4.04g/t Au over 13m from 3m (P17-GCP-0791) | 2.44g/t Au over 21m from 19m (P17-GCP-0601) |
| 4.57g/t Au over 11m from 24m (P17-GCP-0655) | 3.82g/t Au over 13m from 11m (P17-GCP-0249) |
| 4.85g/t Au over 10m from 13m (P17-GCP-0476) | 2.20g/t Au over 22m from 8m (P17-GCP-0652) |
| 3.72g/t Au over 13m from 25m (P17-GCP-0742) | 5.32g/t Au over 9m from 2m (P17-GCP-0797) |
[1] . True widths of mineralization are between 75-80% of drilled lengths.
Patrick Downey, President and CEO stated, “The results of the near-surface P17 Zone grade control drill program were successful in confirming the P17 resource and reserve models. Furthermore, the results serve to underscore the high-grade nature and overall continuity of mineralization within the P17 Zone.
This initial grade control drill program is centered on the first six months of planned production from the P17 Zone. Mining activities in this area of the pit are now underway, with mined ore scheduled to be fed to the mill in early 2026 once commissioning is complete.
Commissioning of the stage 1 hard rock plant is well advanced, with the jaw crusher now commissioned and a crushed ore stockpile established. The SAG mill is now turning, with grinding media being added and first ore through the mill expected to follow very soon. Water testing of the CIL circuit is now complete, with the tanks to be filled and fresh carbon to be added by the end of the week. Overall, commissioning activities remain on schedule, with first gold expected in the coming days.
This is truly an exciting time for the Company, and I want to thank everyone involved for all their hard work and dedication. The commencement of production from the stage 1 hard rock plant represents a major milestone for Orezone, with overall gold production at Bomboré set to increase by 45% to 170,000 to 185,000oz in 2026. This will mark a significant cash flow inflection point, underscored by the Company’s solid balance sheet and record high gold prices.”
Figure 1: Stage 1 Hard Rock Expansion Commissioning

Figure 2: Bomboré Plan Map – Highlighting Location of P17 Grade Control Drilling and Associated Sections

Figure 3: P17 Composite Long Section – Highlighting Location of Grade Control Cross Sections and Further Exploration Upside Down Plunge of US$1,740/oz Pit Shell (Looking West)

Figure 4: P17 Grade Control Cross Section A-A’ (Looking North)

Figure 5: P17 Grade Control Cross Section B-B’ (Looking North)

Table 1: P17 Grade Control Drill Results
| Hole | Zone | Easting | Northing | Elv. | Dip | Azi. | EOH (m) | From (m) | To (m) | Length (m) | Grade (g/t) |
|---|---|---|---|---|---|---|---|---|---|---|---|
| P17-GCP-0225 | P17 S | 730123 | 1342800 | 263 | -50 | 270 | 39 | 26.00 | 38.00 | 12.00 | 2.27 |
| P17-GCP-0226 | P17 S | 730142 | 1342800 | 263 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0227 | P17 S | 730162 | 1342799 | 262 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0228 | P17 S | 730174 | 1342800 | 262 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0229 | P17 S | 730243 | 1342799 | 261 | -50 | 270 | 37 | NSR | |||
| P17-GCP-0230 | P17 S | 730268 | 1342799 | 261 | -50 | 270 | 37 | 28.00 | 30.00 | 2.00 | 1.00 |
| P17-GCP-0231 | P17 S | 730094 | 1342787 | 263 | -50 | 270 | 39 | 0.00 | 4.00 | 4.00 | 0.51 |
| P17-GCP-0232 | P17 S | 730106 | 1342787 | 263 | -50 | 270 | 39 | 14.00 | 20.00 | 6.00 | 1.55 |
| P17-GCP-0233 | P17 S | 730118 | 1342787 | 263 | -50 | 270 | 39 | 20.00 | 30.00 | 10.00 | 1.38 |
| P17-GCP-0236 | P17 S | 730156 | 1342787 | 263 | -50 | 270 | 33 | NSR | |||
| P17-GCP-0237 | P17 S | 730169 | 1342787 | 263 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0238 | P17 S | 730181 | 1342787 | 262 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0239 | P17 S | 730194 | 1342787 | 262 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0241 | P17 S | 730085 | 1342775 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0242 | P17 S | 730099 | 1342775 | 263 | -50 | 270 | 39 | 3.00 | 13.00 | 10.00 | 1.15 |
| P17-GCP-0243 | P17 S | 730173 | 1342775 | 263 | -50 | 270 | 39 | 27.00 | 29.00 | 2.00 | 2.04 |
| P17-GCP-0245 | P17 S | 730259 | 1342774 | 261 | -50 | 270 | 37 | 14.00 | 16.00 | 2.00 | 0.72 |
| P17-GCP-0246 | P17 S | 730275 | 1342774 | 261 | -50 | 270 | 37 | 33.00 | 37.00 | 4.00 | 0.75 |
| P17-GCP-0247 | P17 S | 730093 | 1342762 | 263 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0248 | P17 S | 730106 | 1342762 | 263 | -50 | 270 | 39 | 7.00 | 20.00 | 13.00 | 1.16 |
| P17-GCP-0249 | P17 S | 730119 | 1342762 | 263 | -50 | 270 | 40 | 11.00 | 24.00 | 13.00 | 3.82 |
| P17-GCP-0250 | P17 S | 730131 | 1342762 | 263 | -50 | 270 | 40 | 21.00 | 29.00 | 8.00 | 4.93 |
| P17-GCP-0251 | P17 S | 730143 | 1342762 | 263 | -50 | 270 | 40 | 36.00 | 40.00 | 4.00 | 1.93 |
| P17-GCP-0252 | P17 S | 730169 | 1342762 | 263 | -50 | 270 | 40 | 24.00 | 25.00 | 1.00 | 2.66 |
| P17-GCP-0253 | P17 S | 730181 | 1342762 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0254 | P17 S | 730194 | 1342762 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0255 | P17 S | 730257 | 1342762 | 261 | -50 | 270 | 37 | 17.00 | 23.00 | 6.00 | 0.73 |
| P17-GCP-0256 | P17 S | 730277 | 1342763 | 261 | -50 | 270 | 37 | 31.00 | 37.00 | 6.00 | 0.47 |
| P17-GCP-0257 | P17 S | 730102 | 1342750 | 263 | -50 | 270 | 40 | 3.00 | 7.00 | 4.00 | 0.55 |
| P17-GCP-0258 | P17 S | 730140 | 1342750 | 263 | -50 | 270 | 40 | 28.00 | 37.00 | 9.00 | 1.25 |
| P17-GCP-0259 | P17 S | 730178 | 1342750 | 264 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0260 | P17 S | 730203 | 1342750 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0262 | P17 S | 730265 | 1342750 | 261 | -50 | 270 | 30 | 18.00 | 20.00 | 2.00 | 1.41 |
| P17-GCP-0263 | P17 S | 730285 | 1342749 | 261 | -50 | 270 | 37 | NSR | |||
| P17-GCP-0265 | P17 S | 730117 | 1342737 | 263 | -50 | 270 | 40 | 7.00 | 13.00 | 6.00 | 3.91 |
| P17-GCP-0266 | P17 S | 730128 | 1342737 | 263 | -50 | 270 | 40 | 19.00 | 24.00 | 5.00 | 4.36 |
| P17-GCP-0267 | P17 S | 730152 | 1342737 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0268 | P17 S | 730177 | 1342737 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0269 | P17 S | 730189 | 1342737 | 263 | -50 | 270 | 39 | 32.00 | 37.00 | 5.00 | 0.63 |
| P17-GCP-0270 | P17 S | 730202 | 1342737 | 263 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0271 | P17 S | 730273 | 1342737 | 261 | -50 | 270 | 37 | 25.00 | 32.00 | 7.00 | 0.89 |
| P17-GCP-0272 | P17 S | 730118 | 1342725 | 263 | -50 | 270 | 40 | 10.00 | 14.00 | 4.00 | 3.79 |
| P17-GCP-0273 | P17 S | 730169 | 1342725 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0274 | P17 S | 730180 | 1342724 | 263 | -50 | 270 | 40 | 23.00 | 26.00 | 3.00 | 0.52 |
| P17-GCP-0275 | P17 S | 730190 | 1342725 | 263 | -50 | 270 | 39 | 32.00 | 36.00 | 4.00 | 1.12 |
| P17-GCP-0276 | P17 S | 730215 | 1342725 | 262 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0278 | P17 S | 730268 | 1342725 | 261 | -50 | 270 | 37 | 23.00 | 25.00 | 2.00 | 1.03 |
| P17-GCP-0279 | P17 S | 730120 | 1342712 | 263 | -50 | 270 | 40 | 7.00 | 12.00 | 5.00 | 3.06 |
| P17-GCP-0280 | P17 S | 730145 | 1342712 | 264 | -50 | 270 | 40 | 32.00 | 36.00 | 4.00 | 3.09 |
| P17-GCP-0281 | P17 S | 730156 | 1342712 | 264 | -50 | 270 | 40 | 39.00 | 40.00 | 1.00 | 1.84 |
| P17-GCP-0282 | P17 S | 730168 | 1342712 | 264 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0283 | P17 S | 730181 | 1342712 | 263 | -50 | 270 | 40 | 33.00 | 40.00 | 7.00 | 2.37 |
| P17-GCP-0284 | P17 S | 730194 | 1342712 | 263 | -50 | 270 | 40 | 30.00 | 36.00 | 6.00 | 2.01 |
| P17-GCP-0285 | P17 S | 730206 | 1342712 | 263 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0286 | P17 S | 730219 | 1342712 | 262 | -50 | 270 | 36 | NSR | |||
| P17-GCP-0287 | P17 S | 730231 | 1342712 | 262 | -50 | 270 | 38 | NSR | |||
| P17-GCP-0289 | P17 S | 730268 | 1342712 | 261 | -50 | 270 | 37 | NSR | |||
| P17-GCP-0290 | P17 S | 730148 | 1342700 | 264 | -50 | 270 | 40 | 31.00 | 37.00 | 6.00 | 3.45 |
| P17-GCP-0291 | P17 S | 730169 | 1342700 | 264 | -50 | 270 | 40 | 14.00 | 15.00 | 1.00 | 2.70 |
| P17-GCP-0291 | P17 S | 730169 | 1342700 | 264 | -50 | 270 | 40 | 36.00 | 40.00 | 4.00 | 3.52 |
| P17-GCP-0292 | P17 S | 730119 | 1342687 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0293 | P17 S | 730131 | 1342687 | 263 | -50 | 270 | 40 | 13.00 | 17.00 | 4.00 | 4.46 |
| P17-GCP-0294 | P17 S | 730144 | 1342687 | 264 | -50 | 270 | 40 | 25.00 | 32.00 | 7.00 | 1.63 |
| P17-GCP-0295 | P17 S | 730156 | 1342687 | 264 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0296 | P17 S | 730169 | 1342687 | 264 | -50 | 270 | 40 | 15.00 | 37.00 | 22.00 | 2.98 |
| P17-GCP-0297 | P17 S | 730181 | 1342687 | 264 | -50 | 270 | 40 | 32.00 | 40.00 | 8.00 | 2.95 |
| P17-GCP-0298 | P17 S | 730195 | 1342687 | 263 | -50 | 270 | 40 | 38.00 | 40.00 | 2.00 | 2.65 |
| P17-GCP-0299 | P17 S | 730206 | 1342687 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0300 | P17 S | 730219 | 1342687 | 263 | -50 | 270 | 39 | 26.00 | 39.00 | 13.00 | 3.57 |
| P17-GCP-0301 | P17 S | 730231 | 1342687 | 262 | -50 | 270 | 38 | 26.00 | 34.00 | 8.00 | 0.97 |
| P17-GCP-0303 | P17 S | 730269 | 1342687 | 261 | -50 | 270 | 38 | NSR | |||
| P17-GCP-0304 | P17 S | 730125 | 1342674 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0305 | P17 S | 730148 | 1342675 | 263 | -50 | 270 | 40 | 23.00 | 28.00 | 5.00 | 1.37 |
| P17-GCP-0306 | P17 S | 730131 | 1342662 | 263 | -50 | 270 | 40 | 7.00 | 9.00 | 2.00 | 1.75 |
| P17-GCP-0307 | P17 S | 730143 | 1342662 | 263 | -50 | 270 | 40 | 14.00 | 20.00 | 6.00 | 0.93 |
| P17-GCP-0308 | P17 S | 730156 | 1342662 | 262 | -50 | 270 | 40 | 9.00 | 17.00 | 8.00 | 3.51 |
| P17-GCP-0308 | P17 S | 730156 | 1342662 | 262 | -50 | 270 | 40 | 28.00 | 30.00 | 2.00 | 1.08 |
| P17-GCP-0309 | P17 S | 730168 | 1342662 | 263 | -50 | 270 | 40 | 3.00 | 10.00 | 7.00 | 2.73 |
| P17-GCP-0309 | P17 S | 730168 | 1342662 | 263 | -50 | 270 | 40 | 14.00 | 18.00 | 4.00 | 3.64 |
| P17-GCP-0309 | P17 S | 730168 | 1342662 | 263 | -50 | 270 | 40 | 34.00 | 40.00 | 6.00 | 2.75 |
| P17-GCP-0310 | P17 S | 730181 | 1342662 | 263 | -50 | 270 | 40 | 1.00 | 3.00 | 2.00 | 2.33 |
| P17-GCP-0311 | P17 S | 730194 | 1342662 | 264 | -50 | 270 | 40 | 28.00 | 29.00 | 1.00 | 1.72 |
| P17-GCP-0312 | P17 S | 730206 | 1342662 | 263 | -50 | 270 | 40 | 12.00 | 20.00 | 8.00 | 2.71 |
| P17-GCP-0313 | P17 S | 730219 | 1342662 | 263 | -50 | 270 | 40 | 9.00 | 14.00 | 5.00 | 0.77 |
| P17-GCP-0313 | P17 S | 730219 | 1342662 | 263 | -50 | 270 | 40 | 32.00 | 40.00 | 8.00 | 7.46 |
| P17-GCP-0314 | P17 S | 730231 | 1342662 | 263 | -50 | 270 | 39 | 22.00 | 29.00 | 7.00 | 3.91 |
| P17-GCP-0315 | P17 S | 730243 | 1342662 | 262 | -50 | 270 | 38 | 33.00 | 38.00 | 5.00 | 2.14 |
| P17-GCP-0316 | P17 S | 730254 | 1342663 | 262 | -50 | 270 | 38 | 14.00 | 18.00 | 4.00 | 4.46 |
| P17-GCP-0317 | P17 S | 730268 | 1342662 | 262 | -50 | 270 | 38 | 26.00 | 28.00 | 2.00 | 1.86 |
| P17-GCP-0318 | P17 S | 730281 | 1342662 | 262 | -50 | 270 | 38 | NSR | |||
| P17-GCP-0320 | P17 S | 730170 | 1342649 | 263 | -50 | 270 | 40 | 3.00 | 5.00 | 2.00 | 7.40 |
| P17-GCP-0321 | P17 S | 730201 | 1342650 | 263 | -50 | 270 | 40 | 2.00 | 13.00 | 11.00 | 2.27 |
| P17-GCP-0321 | P17 S | 730201 | 1342650 | 263 | -50 | 270 | 40 | 25.00 | 30.00 | 5.00 | 0.90 |
| P17-GCP-0322 | P17 S | 730223 | 1342650 | 263 | -50 | 270 | 40 | 9.00 | 17.00 | 8.00 | 4.05 |
| P17-GCP-0323 | P17 S | 730169 | 1342637 | 262 | -50 | 270 | 40 | 7.00 | 9.00 | 2.00 | 0.85 |
| P17-GCP-0324 | P17 S | 730181 | 1342637 | 262 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0325 | P17 S | 730192 | 1342637 | 263 | -50 | 270 | 40 | 15.00 | 22.00 | 7.00 | 0.92 |
| P17-GCP-0326 | P17 S | 730206 | 1342637 | 262 | -50 | 270 | 39 | 8.00 | 29.00 | 21.00 | 3.18 |
| P17-GCP-0327 | P17 S | 730218 | 1342637 | 264 | -50 | 270 | 40 | 6.00 | 10.00 | 4.00 | 5.89 |
| P17-GCP-0328 | P17 S | 730231 | 1342637 | 263 | -50 | 270 | 40 | 14.00 | 18.00 | 4.00 | 4.13 |
| P17-GCP-0329 | P17 S | 730244 | 1342637 | 262 | -50 | 270 | 38 | 2.00 | 7.00 | 5.00 | 2.71 |
| P17-GCP-0329 | P17 S | 730244 | 1342637 | 262 | -50 | 270 | 38 | 14.00 | 16.00 | 2.00 | 1.72 |
| P17-GCP-0330 | P17 S | 730255 | 1342638 | 262 | -50 | 270 | 38 | 11.00 | 15.00 | 4.00 | 2.36 |
| P17-GCP-0331 | P17 S | 730268 | 1342637 | 262 | -50 | 270 | 38 | 22.00 | 37.00 | 15.00 | 1.42 |
| P17-GCP-0332 | P17 S | 730196 | 1342625 | 262 | -50 | 270 | 39 | 1.00 | 19.00 | 18.00 | 2.47 |
| P17-GCP-0333 | P17 S | 730215 | 1342625 | 262 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0334 | P17 S | 730262 | 1342625 | 262 | -50 | 270 | 38 | 16.00 | 27.00 | 11.00 | 2.58 |
| P17-GCP-0336 | P17 S | 730214 | 1342612 | 262 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0337 | P17 S | 730227 | 1342612 | 262 | -50 | 270 | 39 | 8.00 | 10.00 | 2.00 | 2.25 |
| P17-GCP-0338 | P17 S | 730258 | 1342612 | 262 | -50 | 270 | 38 | 15.00 | 19.00 | 4.00 | 0.57 |
| P17-GCP-0339 | P17 S | 730236 | 1342600 | 262 | -50 | 270 | 38 | 3.00 | 10.00 | 7.00 | 4.42 |
| P17-GCP-0340 | P17 S | 730256 | 1342600 | 262 | -50 | 270 | 38 | NSR | |||
| P17-GCP-0341 | P17 S | 730276 | 1342599 | 262 | -50 | 270 | 38 | NSR | |||
| P17-GCP-0402 | P17 S | 730117 | 1342806 | 263 | -50 | 270 | 39 | 27.00 | 33.00 | 6.00 | 1.55 |
| P17-GCP-0403 | P17 S | 730123 | 1342806 | 263 | -50 | 270 | 39 | 29.00 | 33.00 | 4.00 | 1.18 |
| P17-GCP-0404 | P17 S | 730129 | 1342805 | 263 | -50 | 270 | 39 | 28.00 | 39.00 | 11.00 | 1.54 |
| P17-GCP-0405 | P17 S | 730136 | 1342805 | 263 | -50 | 270 | 39 | 33.00 | 39.00 | 6.00 | 4.67 |
| P17-GCP-0406 | P17 S | 730167 | 1342806 | 262 | -50 | 270 | 39 | 3.00 | 5.00 | 2.00 | 0.93 |
| P17-GCP-0407 | P17 S | 730173 | 1342806 | 262 | -50 | 270 | 39 | 34.00 | 35.00 | 1.00 | 2.00 |
| P17-GCP-0413 | P17 S | 730129 | 1342799 | 263 | -50 | 270 | 39 | 28.00 | 39.00 | 11.00 | 3.07 |
| P17-GCP-0416 | P17 S | 730100 | 1342793 | 263 | -50 | 270 | 39 | 12.00 | 15.00 | 3.00 | 0.79 |
| P17-GCP-0417 | P17 S | 730106 | 1342793 | 263 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0418 | P17 S | 730112 | 1342793 | 263 | -50 | 270 | 39 | 19.00 | 24.00 | 5.00 | 0.52 |
| P17-GCP-0419 | P17 S | 730119 | 1342793 | 263 | -50 | 270 | 39 | 21.00 | 27.00 | 6.00 | 0.75 |
| P17-GCP-0420 | P17 S | 730125 | 1342793 | 263 | -50 | 270 | 39 | 22.00 | 38.00 | 16.00 | 1.86 |
| P17-GCP-0421 | P17 S | 730131 | 1342793 | 263 | -50 | 270 | 39 | 26.00 | 39.00 | 13.00 | 3.63 |
| P17-GCP-0422 | P17 S | 730137 | 1342793 | 263 | -50 | 270 | 39 | 33.00 | 39.00 | 6.00 | 5.38 |
| P17-GCP-0423 | P17 S | 730174 | 1342793 | 262 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0427 | P17 S | 730100 | 1342787 | 263 | -50 | 270 | 39 | 6.00 | 7.00 | 1.00 | 2.57 |
| P17-GCP-0428 | P17 S | 730112 | 1342787 | 263 | -50 | 270 | 39 | 15.00 | 16.00 | 1.00 | 1.71 |
| P17-GCP-0429 | P17 S | 730125 | 1342787 | 263 | -50 | 270 | 39 | 20.00 | 36.00 | 16.00 | 2.59 |
| P17-GCP-0430 | P17 S | 730130 | 1342787 | 263 | -50 | 270 | 39 | 27.00 | 38.00 | 11.00 | 4.06 |
| P17-GCP-0431 | P17 S | 730137 | 1342787 | 263 | -50 | 270 | 39 | 32.00 | 39.00 | 7.00 | 4.78 |
| P17-GCP-0435 | P17 S | 730092 | 1342781 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0436 | P17 S | 730098 | 1342781 | 263 | -50 | 270 | 40 | 4.00 | 6.00 | 2.00 | 0.92 |
| P17-GCP-0437 | P17 S | 730105 | 1342781 | 263 | -50 | 270 | 40 | 14.00 | 18.00 | 4.00 | 0.88 |
| P17-GCP-0438 | P17 S | 730111 | 1342781 | 263 | -50 | 270 | 40 | 14.00 | 18.00 | 4.00 | 1.93 |
| P17-GCP-0439 | P17 S | 730118 | 1342781 | 263 | -50 | 270 | 40 | 17.00 | 31.00 | 14.00 | 1.08 |
| P17-GCP-0440 | P17 S | 730123 | 1342781 | 263 | -50 | 270 | 40 | 18.00 | 30.00 | 12.00 | 3.23 |
| P17-GCP-0441 | P17 S | 730129 | 1342781 | 263 | -50 | 270 | 40 | 24.00 | 35.00 | 11.00 | 2.88 |
| P17-GCP-0442 | P17 S | 730136 | 1342781 | 263 | -50 | 270 | 40 | 30.00 | 40.00 | 10.00 | 3.66 |
| P17-GCP-0443 | P17 S | 730142 | 1342781 | 263 | -50 | 270 | 40 | 36.00 | 40.00 | 4.00 | 3.74 |
| P17-GCP-0445 | P17 S | 730261 | 1342781 | 263 | -50 | 270 | 37 | ARP | |||
| P17-GCP-0446 | P17 S | 730267 | 1342781 | 263 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0447 | P17 S | 730274 | 1342781 | 263 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0448 | P17 S | 730094 | 1342774 | 263 | -50 | 270 | 14 | NSR | |||
| P17-GCP-0449 | P17 S | 730105 | 1342775 | 263 | -50 | 270 | 26 | 6.00 | 10.00 | 4.00 | 3.01 |
| P17-GCP-0449 | P17 S | 730105 | 1342775 | 263 | -50 | 270 | 26 | 16.00 | 18.00 | 2.00 | 1.03 |
| P17-GCP-0450 | P17 S | 730117 | 1342774 | 263 | -50 | 270 | 33 | 12.00 | 24.00 | 12.00 | 2.26 |
| P17-GCP-0451 | P17 S | 730134 | 1342775 | 263 | -50 | 270 | 39 | 27.00 | 35.00 | 8.00 | 2.26 |
| P17-GCP-0452 | P17 S | 730166 | 1342774 | 263 | -50 | 270 | 36 | 20.00 | 21.00 | 1.00 | 12.83 |
| P17-GCP-0454 | P17 S | 730271 | 1342775 | 261 | -50 | 270 | 37 | ARP | |||
| P17-GCP-0455 | P17 S | 730094 | 1342768 | 263 | -50 | 270 | 15 | NSR | |||
| P17-GCP-0456 | P17 S | 730100 | 1342768 | 263 | -50 | 270 | 20 | NSR | |||
| P17-GCP-0457 | P17 S | 730106 | 1342768 | 263 | -50 | 270 | 25 | 7.00 | 14.00 | 7.00 | 2.80 |
| P17-GCP-0458 | P17 S | 730112 | 1342768 | 263 | -50 | 270 | 31 | 7.00 | 19.00 | 12.00 | 2.30 |
| P17-GCP-0459 | P17 S | 730118 | 1342768 | 263 | -50 | 270 | 39 | 11.00 | 23.00 | 12.00 | 2.30 |
| P17-GCP-0460 | P17 S | 730125 | 1342768 | 263 | -50 | 270 | 39 | 18.00 | 29.00 | 11.00 | 2.76 |
| P17-GCP-0461 | P17 S | 730131 | 1342768 | 263 | -50 | 270 | 39 | 23.00 | 30.00 | 7.00 | 5.71 |
| P17-GCP-0462 | P17 S | 730137 | 1342768 | 263 | -50 | 270 | 39 | 29.00 | 36.00 | 7.00 | 3.58 |
| P17-GCP-0463 | P17 S | 730143 | 1342768 | 263 | -50 | 270 | 39 | 34.00 | 39.00 | 5.00 | 1.61 |
| P17-GCP-0464 | P17 S | 730256 | 1342768 | 263 | -50 | 270 | 32 | ARP | |||
| P17-GCP-0465 | P17 S | 730262 | 1342768 | 263 | -50 | 270 | 39 | ARP | |||
| P17-GCP-0466 | P17 S | 730268 | 1342768 | 263 | -50 | 270 | 39 | ARP | |||
| P17-GCP-0467 | P17 S | 730275 | 1342768 | 263 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0468 | P17 S | 730100 | 1342762 | 263 | -50 | 270 | 22 | NSR | |||
| P17-GCP-0469 | P17 S | 730113 | 1342762 | 263 | -50 | 270 | 29 | 6.00 | 17.00 | 11.00 | 1.54 |
| P17-GCP-0470 | P17 S | 730124 | 1342762 | 263 | -50 | 270 | 40 | 17.00 | 26.00 | 9.00 | 3.74 |
| P17-GCP-0471 | P17 S | 730137 | 1342762 | 263 | -50 | 270 | 38 | 29.00 | 36.00 | 7.00 | 3.97 |
| P17-GCP-0473 | P17 S | 730268 | 1342762 | 261 | -50 | 270 | 37 | NSR | |||
| P17-GCP-0474 | P17 S | 730108 | 1342756 | 263 | -50 | 270 | 25 | 6.00 | 14.00 | 8.00 | 1.86 |
| P17-GCP-0475 | P17 S | 730115 | 1342756 | 263 | -50 | 270 | 29 | 7.00 | 20.00 | 13.00 | 2.43 |
| P17-GCP-0476 | P17 S | 730121 | 1342756 | 263 | -50 | 270 | 32 | 13.00 | 23.00 | 10.00 | 4.85 |
| P17-GCP-0477 | P17 S | 730127 | 1342755 | 263 | -50 | 270 | 40 | 17.00 | 24.00 | 7.00 | 2.51 |
| P17-GCP-0478 | P17 S | 730133 | 1342755 | 263 | -50 | 270 | 40 | 25.00 | 30.00 | 5.00 | 3.54 |
| P17-GCP-0479 | P17 S | 730139 | 1342756 | 263 | -50 | 270 | 40 | 31.00 | 36.00 | 5.00 | 2.75 |
| P17-GCP-0480 | P17 S | 730146 | 1342756 | 263 | -50 | 270 | 40 | 1.00 | 2.00 | 1.00 | 5.13 |
| P17-GCP-0481 | P17 S | 730252 | 1342756 | 261 | -50 | 270 | 29 | ARP | |||
| P17-GCP-0482 | P17 S | 730258 | 1342756 | 261 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0483 | P17 S | 730264 | 1342756 | 263 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0484 | P17 S | 730271 | 1342756 | 263 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0485 | P17 S | 730277 | 1342756 | 263 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0486 | P17 S | 730109 | 1342749 | 263 | -50 | 270 | 23 | 4.00 | 12.00 | 8.00 | 4.89 |
| P17-GCP-0487 | P17 S | 730119 | 1342749 | 263 | -50 | 270 | 29 | 10.00 | 19.00 | 9.00 | 4.02 |
| P17-GCP-0488 | P17 S | 730134 | 1342749 | 263 | -50 | 270 | 40 | 26.00 | 31.00 | 5.00 | 6.54 |
| P17-GCP-0489 | P17 S | 730146 | 1342749 | 263 | -50 | 270 | 40 | 37.00 | 39.00 | 2.00 | 4.06 |
| P17-GCP-0491 | P17 S | 730280 | 1342750 | 261 | -50 | 270 | 37 | ARP | |||
| P17-GCP-0492 | P17 S | 730112 | 1342743 | 263 | -50 | 270 | 31 | 7.00 | 16.00 | 9.00 | 2.84 |
| P17-GCP-0493 | P17 S | 730118 | 1342743 | 263 | -50 | 270 | 26 | 10.00 | 16.00 | 6.00 | 5.46 |
| P17-GCP-0494 | P17 S | 730125 | 1342743 | 263 | -50 | 270 | 31 | 15.00 | 21.00 | 6.00 | 4.67 |
| P17-GCP-0495 | P17 S | 730131 | 1342743 | 263 | -50 | 270 | 40 | 22.00 | 28.00 | 6.00 | 4.06 |
| P17-GCP-0496 | P17 S | 730137 | 1342743 | 263 | -50 | 270 | 40 | 29.00 | 34.00 | 5.00 | 1.16 |
| P17-GCP-0497 | P17 S | 730144 | 1342743 | 263 | -50 | 270 | 40 | 31.00 | 37.00 | 6.00 | 3.23 |
| P17-GCP-0498 | P17 S | 730181 | 1342744 | 263 | -50 | 270 | 40 | 24.00 | 25.00 | 1.00 | 3.25 |
| P17-GCP-0498 | P17 S | 730181 | 1342744 | 263 | -50 | 270 | 40 | 38.00 | 40.00 | 2.00 | 16.55 |
| P17-GCP-0499 | P17 S | 730249 | 1342743 | 261 | -50 | 270 | 28 | NSR | |||
| P17-GCP-0500 | P17 S | 730256 | 1342743 | 264 | -50 | 270 | 40 | 7.00 | 13.00 | 6.00 | 1.21 |
| P17-GCP-0501 | P17 S | 730262 | 1342743 | 264 | -50 | 270 | 40 | 13.00 | 31.00 | 18.00 | 1.45 |
| P17-GCP-0502 | P17 S | 730268 | 1342743 | 264 | -50 | 270 | 40 | 19.00 | 35.00 | 16.00 | 0.98 |
| P17-GCP-0503 | P17 S | 730111 | 1342737 | 262 | -50 | 270 | 18 | 5.00 | 10.00 | 5.00 | 2.53 |
| P17-GCP-0504 | P17 S | 730123 | 1342737 | 263 | -50 | 270 | 26 | 12.00 | 19.00 | 7.00 | 6.64 |
| P17-GCP-0505 | P17 S | 730134 | 1342737 | 263 | -50 | 270 | 33 | 24.00 | 31.00 | 7.00 | 1.62 |
| P17-GCP-0506 | P17 S | 730146 | 1342737 | 263 | -50 | 270 | 40 | 35.00 | 40.00 | 5.00 | 6.70 |
| P17-GCP-0507 | P17 S | 730184 | 1342737 | 263 | -50 | 270 | 40 | 25.00 | 28.00 | 3.00 | 0.71 |
| P17-GCP-0508 | P17 S | 730196 | 1342737 | 263 | -50 | 270 | 40 | 38.00 | 40.00 | 2.00 | 2.65 |
| P17-GCP-0509 | P17 S | 730255 | 1342737 | 263 | -50 | 270 | 40 | 10.00 | 18.00 | 8.00 | 0.74 |
| P17-GCP-0510 | P17 S | 730269 | 1342737 | 263 | -50 | 270 | 40 | 19.00 | 34.00 | 15.00 | 1.43 |
| P17-GCP-0511 | P17 S | 730280 | 1342737 | 261 | -50 | 270 | 37 | NSR | |||
| P17-GCP-0512 | P17 S | 730112 | 1342731 | 263 | -50 | 270 | 16 | NSR | |||
| P17-GCP-0513 | P17 S | 730118 | 1342731 | 263 | -50 | 270 | 22 | 9.00 | 14.00 | 5.00 | 6.53 |
| P17-GCP-0514 | P17 S | 730125 | 1342731 | 263 | -50 | 270 | 27 | 15.00 | 22.00 | 7.00 | 2.30 |
| P17-GCP-0515 | P17 S | 730131 | 1342731 | 263 | -50 | 270 | 32 | 21.00 | 24.00 | 3.00 | 1.58 |
| P17-GCP-0516 | P17 S | 730137 | 1342731 | 263 | -50 | 270 | 36 | 26.00 | 30.00 | 4.00 | 2.19 |
| P17-GCP-0517 | P17 S | 730143 | 1342731 | 263 | -50 | 270 | 40 | 31.00 | 36.00 | 5.00 | 2.49 |
| P17-GCP-0518 | P17 S | 730168 | 1342731 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0519 | P17 S | 730174 | 1342731 | 263 | -50 | 270 | 40 | 18.00 | 24.00 | 6.00 | 2.02 |
| P17-GCP-0520 | P17 S | 730181 | 1342731 | 263 | -50 | 270 | 40 | 15.00 | 16.00 | 1.00 | 1.37 |
| P17-GCP-0521 | P17 S | 730187 | 1342731 | 263 | -50 | 270 | 40 | 29.00 | 34.00 | 5.00 | 1.54 |
| P17-GCP-0523 | P17 S | 730256 | 1342731 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0524 | P17 S | 730262 | 1342731 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0525 | P17 S | 730268 | 1342731 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0526 | P17 S | 730125 | 1342724 | 263 | -50 | 270 | 26 | 8.00 | 9.00 | 1.00 | 7.62 |
| P17-GCP-0527 | P17 S | 730137 | 1342725 | 263 | -50 | 270 | 36 | 25.00 | 30.00 | 5.00 | 1.97 |
| P17-GCP-0528 | P17 S | 730174 | 1342724 | 263 | -50 | 270 | 40 | 15.00 | 18.00 | 3.00 | 0.93 |
| P17-GCP-0530 | P17 S | 730120 | 1342718 | 263 | -50 | 270 | 23 | 6.00 | 14.00 | 8.00 | 3.37 |
| P17-GCP-0531 | P17 S | 730126 | 1342718 | 264 | -50 | 270 | 28 | 14.00 | 17.00 | 3.00 | 3.86 |
| P17-GCP-0532 | P17 S | 730133 | 1342718 | 264 | -50 | 270 | 33 | 20.00 | 24.00 | 4.00 | 2.75 |
| P17-GCP-0533 | P17 S | 730139 | 1342718 | 263 | -50 | 270 | 38 | 27.00 | 31.00 | 4.00 | 2.84 |
| P17-GCP-0534 | P17 S | 730145 | 1342718 | 263 | -50 | 270 | 40 | 32.00 | 38.00 | 6.00 | 3.31 |
| P17-GCP-0535 | P17 S | 730164 | 1342718 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0536 | P17 S | 730170 | 1342718 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0537 | P17 S | 730177 | 1342718 | 263 | -50 | 270 | 40 | 19.00 | 20.00 | 1.00 | 1.41 |
| P17-GCP-0538 | P17 S | 730183 | 1342718 | 263 | -51 | 271 | 40 | 21.00 | 26.00 | 5.00 | 0.49 |
| P17-GCP-0539 | P17 S | 730189 | 1342718 | 263 | -50 | 270 | 40 | 27.00 | 32.00 | 5.00 | 0.68 |
| P17-GCP-0540 | P17 S | 730195 | 1342719 | 263 | -49 | 273 | 40 | 34.00 | 40.00 | 6.00 | 1.19 |
| P17-GCP-0543 | P17 S | 730258 | 1342718 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0544 | P17 S | 730264 | 1342718 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0545 | P17 S | 730127 | 1342712 | 263 | -50 | 270 | 23 | 13.00 | 17.00 | 4.00 | 3.14 |
| P17-GCP-0546 | P17 S | 730138 | 1342712 | 263 | -50 | 270 | 36 | 7.00 | 9.00 | 2.00 | 4.76 |
| P17-GCP-0547 | P17 S | 730151 | 1342712 | 263 | -50 | 270 | 40 | 37.00 | 40.00 | 3.00 | 2.35 |
| P17-GCP-0548 | P17 S | 730162 | 1342712 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0549 | P17 S | 730187 | 1342712 | 263 | -50 | 270 | 40 | 27.00 | 30.00 | 3.00 | 0.61 |
| P17-GCP-0549 | P17 S | 730187 | 1342712 | 263 | -50 | 270 | 40 | 39.00 | 40.00 | 1.00 | 1.76 |
| P17-GCP-0550 | P17 S | 730200 | 1342712 | 263 | -50 | 270 | 40 | 35.00 | 40.00 | 5.00 | 4.81 |
| P17-GCP-0553 | P17 S | 730262 | 1342712 | 262 | -50 | 270 | 37 | ARP | |||
| P17-GCP-0554 | P17 S | 730129 | 1342706 | 263 | -50 | 270 | 29 | 15.00 | 20.00 | 5.00 | 2.74 |
| P17-GCP-0555 | P17 S | 730136 | 1342706 | 263 | -50 | 270 | 34 | 22.00 | 25.00 | 3.00 | 5.11 |
| P17-GCP-0556 | P17 S | 730142 | 1342705 | 263 | -50 | 270 | 40 | 28.00 | 31.00 | 3.00 | 4.43 |
| P17-GCP-0557 | P17 S | 730148 | 1342705 | 263 | -50 | 270 | 40 | 32.00 | 38.00 | 6.00 | 3.49 |
| P17-GCP-0558 | P17 S | 730167 | 1342706 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0559 | P17 S | 730174 | 1342706 | 263 | -50 | 270 | 40 | 3.00 | 4.00 | 1.00 | 1.66 |
| P17-GCP-0559 | P17 S | 730174 | 1342706 | 263 | -50 | 270 | 40 | 38.00 | 40.00 | 2.00 | 4.33 |
| P17-GCP-0560 | P17 S | 730179 | 1342706 | 263 | -50 | 270 | 40 | 20.00 | 21.00 | 1.00 | 1.43 |
| P17-GCP-0560 | P17 S | 730179 | 1342706 | 263 | -50 | 270 | 40 | 37.00 | 40.00 | 3.00 | 5.59 |
| P17-GCP-0561 | P17 S | 730186 | 1342706 | 263 | -50 | 270 | 40 | 33.00 | 40.00 | 7.00 | 1.00 |
| P17-GCP-0562 | P17 S | 730192 | 1342705 | 263 | -50 | 270 | 40 | 29.00 | 40.00 | 11.00 | 1.30 |
| P17-GCP-0563 | P17 S | 730199 | 1342705 | 263 | -50 | 270 | 40 | 34.00 | 40.00 | 6.00 | 4.95 |
| P17-GCP-0564 | P17 S | 730205 | 1342706 | 263 | -50 | 270 | 40 | 32.00 | 37.00 | 5.00 | 0.55 |
| P17-GCP-0565 | P17 S | 730224 | 1342706 | 262 | -50 | 270 | 40 | 35.00 | 40.00 | 5.00 | 1.06 |
| P17-GCP-0566 | P17 S | 730228 | 1342706 | 262 | -50 | 270 | 40 | 38.00 | 40.00 | 2.00 | 1.42 |
| P17-GCP-0568 | P17 S | 730254 | 1342706 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0569 | P17 S | 730261 | 1342706 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0570 | P17 S | 730129 | 1342700 | 263 | -50 | 270 | 25 | 14.00 | 19.00 | 5.00 | 4.10 |
| P17-GCP-0571 | P17 S | 730142 | 1342699 | 263 | -50 | 270 | 36 | 25.00 | 31.00 | 6.00 | 4.16 |
| P17-GCP-0572 | P17 S | 730187 | 1342699 | 263 | -50 | 270 | 40 | 23.00 | 29.00 | 6.00 | 1.72 |
| P17-GCP-0573 | P17 S | 730205 | 1342699 | 263 | -50 | 270 | 40 | 31.00 | 32.00 | 1.00 | 1.84 |
| P17-GCP-0574 | P17 S | 730224 | 1342699 | 262 | -50 | 270 | 40 | 32.00 | 40.00 | 8.00 | 1.15 |
| P17-GCP-0575 | P17 S | 730258 | 1342700 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0576 | P17 S | 730124 | 1342693 | 263 | -50 | 270 | 18 | 7.00 | 11.00 | 4.00 | 1.57 |
| P17-GCP-0577 | P17 S | 730131 | 1342693 | 263 | -50 | 270 | 26 | 15.00 | 17.00 | 2.00 | 3.43 |
| P17-GCP-0578 | P17 S | 730137 | 1342693 | 263 | -50 | 270 | 32 | 21.00 | 25.00 | 4.00 | 4.39 |
| P17-GCP-0579 | P17 S | 730143 | 1342693 | 263 | -50 | 270 | 37 | 26.00 | 32.00 | 6.00 | 4.06 |
| P17-GCP-0580 | P17 S | 730150 | 1342693 | 263 | -50 | 270 | 40 | 30.00 | 37.00 | 7.00 | 1.67 |
| P17-GCP-0581 | P17 S | 730156 | 1342693 | 263 | -50 | 270 | 40 | 36.00 | 40.00 | 4.00 | 2.32 |
| P17-GCP-0582 | P17 S | 730162 | 1342693 | 264 | -50 | 270 | 40 | 16.00 | 17.00 | 1.00 | 3.57 |
| P17-GCP-0583 | P17 S | 730168 | 1342693 | 264 | -50 | 270 | 40 | 19.00 | 28.00 | 9.00 | 3.92 |
| P17-GCP-0584 | P17 S | 730175 | 1342693 | 263 | -50 | 270 | 40 | 26.00 | 40.00 | 14.00 | 4.31 |
| P17-GCP-0585 | P17 S | 730181 | 1342693 | 263 | -50 | 270 | 40 | 17.00 | 40.00 | 23.00 | 1.56 |
| P17-GCP-0586 | P17 S | 730187 | 1342693 | 263 | -50 | 270 | 40 | 17.00 | 29.00 | 12.00 | 0.99 |
| P17-GCP-0587 | P17 S | 730193 | 1342693 | 263 | -50 | 270 | 40 | 29.00 | 39.00 | 10.00 | 1.78 |
| P17-GCP-0588 | P17 S | 730200 | 1342693 | 263 | -50 | 270 | 40 | 35.00 | 40.00 | 5.00 | 1.37 |
| P17-GCP-0589 | P17 S | 730206 | 1342693 | 263 | -50 | 270 | 40 | 37.00 | 40.00 | 3.00 | 1.32 |
| P17-GCP-0591 | P17 S | 730231 | 1342693 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0592 | P17 S | 730237 | 1342693 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0594 | P17 S | 730250 | 1342693 | 264 | -50 | 270 | 23 | ARP | |||
| P17-GCP-0595 | P17 S | 730256 | 1342693 | 264 | -50 | 270 | 31 | ARP | |||
| P17-GCP-0596 | P17 S | 730262 | 1342693 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0597 | P17 S | 730125 | 1342687 | 264 | -50 | 270 | 19 | 6.00 | 10.00 | 4.00 | 2.37 |
| P17-GCP-0598 | P17 S | 730136 | 1342687 | 263 | -50 | 270 | 30 | 19.00 | 24.00 | 5.00 | 4.78 |
| P17-GCP-0599 | P17 S | 730150 | 1342687 | 263 | -50 | 270 | 40 | 31.00 | 35.00 | 4.00 | 1.36 |
| P17-GCP-0600 | P17 S | 730162 | 1342687 | 263 | -50 | 270 | 40 | 14.00 | 23.00 | 9.00 | 2.76 |
| P17-GCP-0601 | P17 S | 730174 | 1342687 | 264 | -50 | 270 | 40 | 19.00 | 40.00 | 21.00 | 2.44 |
| P17-GCP-0602 | P17 S | 730187 | 1342687 | 263 | -50 | 270 | 40 | 23.00 | 40.00 | 17.00 | 2.07 |
| P17-GCP-0603 | P17 S | 730201 | 1342687 | 263 | -50 | 270 | 40 | 35.00 | 40.00 | 5.00 | 2.04 |
| P17-GCP-0604 | P17 S | 730212 | 1342687 | 263 | -50 | 270 | 40 | 23.00 | 28.00 | 5.00 | 1.74 |
| P17-GCP-0605 | P17 S | 730225 | 1342687 | 263 | -50 | 270 | 39 | 27.00 | 31.00 | 4.00 | 1.67 |
| P17-GCP-0610 | P17 S | 730140 | 1342681 | 263 | -49 | 273 | 31 | 18.00 | 25.00 | 7.00 | 1.49 |
| P17-GCP-0611 | P17 S | 730147 | 1342681 | 263 | -49 | 273 | 36 | 28.00 | 32.00 | 4.00 | 2.13 |
| P17-GCP-0612 | P17 S | 730153 | 1342681 | 263 | -50 | 270 | 40 | 32.00 | 34.00 | 2.00 | 2.16 |
| P17-GCP-0613 | P17 S | 730164 | 1342681 | 263 | -49 | 271 | 40 | 9.00 | 30.00 | 21.00 | 2.52 |
| P17-GCP-0614 | P17 S | 730171 | 1342681 | 263 | -48 | 274 | 40 | 9.00 | 13.00 | 4.00 | 0.97 |
| P17-GCP-0614 | P17 S | 730171 | 1342681 | 263 | -48 | 274 | 40 | 17.00 | 40.00 | 23.00 | 2.48 |
| P17-GCP-0615 | P17 S | 730177 | 1342681 | 263 | -50 | 270 | 40 | 11.00 | 20.00 | 9.00 | 2.01 |
| P17-GCP-0616 | P17 S | 730183 | 1342681 | 263 | -48 | 272 | 40 | 16.00 | 25.00 | 9.00 | 1.90 |
| P17-GCP-0616 | P17 S | 730183 | 1342681 | 263 | -48 | 272 | 40 | 30.00 | 39.00 | 9.00 | 1.22 |
| P17-GCP-0617 | P17 S | 730190 | 1342680 | 263 | -50 | 270 | 40 | 24.00 | 40.00 | 16.00 | 4.18 |
| P17-GCP-0618 | P17 S | 730196 | 1342681 | 263 | -50 | 270 | 40 | 29.00 | 40.00 | 11.00 | 1.64 |
| P17-GCP-0619 | P17 S | 730202 | 1342681 | 263 | -50 | 270 | 40 | 34.00 | 36.00 | 2.00 | 2.48 |
| P17-GCP-0620 | P17 S | 730208 | 1342681 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0621 | P17 S | 730215 | 1342681 | 263 | -50 | 270 | 27 | 26.00 | 27.00 | 1.00 | 1.43 |
| P17-GCP-0622 | P17 S | 730221 | 1342681 | 263 | -50 | 270 | 40 | 19.00 | 33.00 | 14.00 | 0.50 |
| P17-GCP-0623 | P17 S | 730227 | 1342681 | 262 | -50 | 270 | 40 | 21.00 | 22.00 | 1.00 | 1.53 |
| P17-GCP-0626 | P17 S | 730246 | 1342681 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0627 | P17 S | 730252 | 1342681 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0628 | P17 S | 730259 | 1342681 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0629 | P17 S | 730265 | 1342681 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0630 | P17 S | 730131 | 1342675 | 263 | -50 | 270 | 19 | 8.00 | 12.00 | 4.00 | 2.61 |
| P17-GCP-0632 | P17 S | 730143 | 1342675 | 264 | -50 | 270 | 29 | 12.00 | 18.00 | 6.00 | 2.31 |
| P17-GCP-0633 | P17 S | 730153 | 1342675 | 263 | -50 | 270 | 40 | 7.00 | 17.00 | 10.00 | 1.50 |
| P17-GCP-0634 | P17 S | 730160 | 1342674 | 263 | -52 | 272 | 40 | 9.00 | 30.00 | 21.00 | 2.60 |
| P17-GCP-0635 | P17 S | 730166 | 1342675 | 263 | -49 | 274 | 40 | 13.00 | 32.00 | 19.00 | 3.26 |
| P17-GCP-0636 | P17 S | 730172 | 1342675 | 263 | -50 | 270 | 40 | 6.00 | 14.00 | 8.00 | 1.68 |
| P17-GCP-0637 | P17 S | 730186 | 1342675 | 263 | -50 | 270 | 40 | 18.00 | 40.00 | 22.00 | 2.72 |
| P17-GCP-0638 | P17 S | 730204 | 1342675 | 263 | -50 | 270 | 40 | 28.00 | 29.00 | 1.00 | 5.93 |
| P17-GCP-0639 | P17 S | 730223 | 1342674 | 263 | -50 | 270 | 40 | 19.00 | 27.00 | 8.00 | 1.64 |
| P17-GCP-0641 | P17 S | 730254 | 1342675 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0642 | P17 S | 730261 | 1342675 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0643 | P17 S | 730274 | 1342675 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0644 | P17 S | 730125 | 1342669 | 263 | -50 | 270 | 12 | NSR | |||
| P17-GCP-0645 | P17 S | 730132 | 1342668 | 262 | -50 | 270 | 18 | 6.00 | 10.00 | 4.00 | 2.86 |
| P17-GCP-0646 | P17 S | 730137 | 1342668 | 263 | -50 | 270 | 24 | 10.00 | 15.00 | 5.00 | 1.54 |
| P17-GCP-0647 | P17 S | 730144 | 1342668 | 263 | -50 | 270 | 30 | 17.00 | 22.00 | 5.00 | 1.22 |
| P17-GCP-0648 | P17 S | 730150 | 1342668 | 262 | -50 | 270 | 35 | 4.00 | 12.00 | 8.00 | 1.25 |
| P17-GCP-0649 | P17 S | 730156 | 1342668 | 262 | -50 | 270 | 40 | 8.00 | 21.00 | 13.00 | 3.22 |
| P17-GCP-0649 | P17 S | 730156 | 1342668 | 262 | -50 | 270 | 40 | 29.00 | 36.00 | 7.00 | 1.41 |
| P17-GCP-0650 | P17 S | 730163 | 1342668 | 263 | -50 | 270 | 40 | 8.00 | 25.00 | 17.00 | 3.39 |
| P17-GCP-0651 | P17 S | 730168 | 1342668 | 263 | -50 | 270 | 40 | 7.00 | 9.00 | 2.00 | 1.91 |
| P17-GCP-0652 | P17 S | 730175 | 1342668 | 263 | -50 | 270 | 40 | 8.00 | 30.00 | 22.00 | 2.20 |
| P17-GCP-0653 | P17 S | 730182 | 1342668 | 263 | -50 | 270 | 40 | 15.00 | 37.00 | 22.00 | 3.29 |
| P17-GCP-0654 | P17 S | 730188 | 1342668 | 263 | -50 | 270 | 40 | 22.00 | 36.00 | 14.00 | 1.66 |
| P17-GCP-0655 | P17 S | 730194 | 1342668 | 263 | -50 | 270 | 40 | 24.00 | 35.00 | 11.00 | 4.57 |
| P17-GCP-0656 | P17 S | 730200 | 1342668 | 263 | -50 | 270 | 40 | 19.00 | 23.00 | 4.00 | 0.60 |
| P17-GCP-0657 | P17 S | 730206 | 1342668 | 263 | -50 | 270 | 40 | 14.00 | 18.00 | 4.00 | 1.70 |
| P17-GCP-0658 | P17 S | 730213 | 1342668 | 263 | -50 | 270 | 40 | 11.00 | 26.00 | 15.00 | 1.77 |
| P17-GCP-0658 | P17 S | 730213 | 1342668 | 263 | -50 | 270 | 40 | 36.00 | 37.00 | 1.00 | 2.55 |
| P17-GCP-0659 | P17 S | 730219 | 1342668 | 263 | -50 | 270 | 32 | 13.00 | 22.00 | 9.00 | 1.13 |
| P17-GCP-0659 | P17 S | 730219 | 1342668 | 263 | -50 | 270 | 32 | 27.00 | 32.00 | 5.00 | 5.48 |
| P17-GCP-0660 | P17 S | 730225 | 1342668 | 263 | -50 | 270 | 40 | 19.00 | 28.00 | 9.00 | 5.84 |
| P17-GCP-0661 | P17 S | 730231 | 1342668 | 262 | -50 | 270 | 40 | 23.00 | 30.00 | 7.00 | 2.92 |
| P17-GCP-0662 | P17 S | 730236 | 1342668 | 262 | -50 | 270 | 40 | 29.00 | 35.00 | 6.00 | 1.39 |
| P17-GCP-0663 | P17 S | 730244 | 1342668 | 264 | -50 | 270 | 40 | 2.00 | 3.00 | 1.00 | 1.21 |
| P17-GCP-0664 | P17 S | 730250 | 1342668 | 264 | -50 | 270 | 40 | 4.00 | 8.00 | 4.00 | 1.61 |
| P17-GCP-0665 | P17 S | 730256 | 1342668 | 264 | -50 | 270 | 40 | 15.00 | 17.00 | 2.00 | 3.50 |
| P17-GCP-0666 | P17 S | 730263 | 1342668 | 264 | -50 | 270 | 40 | 22.00 | 26.00 | 4.00 | 3.20 |
| P17-GCP-0667 | P17 S | 730269 | 1342668 | 264 | -50 | 270 | 40 | 29.00 | 31.00 | 2.00 | 1.23 |
| P17-GCP-0668 | P17 S | 730275 | 1342668 | 264 | -50 | 270 | 40 | 35.00 | 37.00 | 2.00 | 1.81 |
| P17-GCP-0669 | P17 S | 730137 | 1342662 | 263 | -50 | 270 | 21 | 9.00 | 14.00 | 5.00 | 1.83 |
| P17-GCP-0670 | P17 S | 730150 | 1342662 | 262 | -50 | 270 | 33 | 7.00 | 11.00 | 4.00 | 2.09 |
| P17-GCP-0671 | P17 S | 730161 | 1342662 | 262 | -50 | 270 | 40 | 6.00 | 19.00 | 13.00 | 2.12 |
| P17-GCP-0672 | P17 S | 730175 | 1342662 | 263 | -50 | 270 | 40 | 6.00 | 32.00 | 26.00 | 3.28 |
| P17-GCP-0673 | P17 S | 730187 | 1342662 | 263 | -50 | 270 | 37 | 19.00 | 27.00 | 8.00 | 1.66 |
| P17-GCP-0674 | P17 S | 730200 | 1342662 | 263 | -50 | 270 | 40 | 20.00 | 37.00 | 17.00 | 2.34 |
| P17-GCP-0675 | P17 S | 730212 | 1342662 | 263 | -50 | 270 | 40 | 8.00 | 24.00 | 16.00 | 1.08 |
| P17-GCP-0676 | P17 S | 730225 | 1342662 | 263 | -50 | 270 | 40 | 16.00 | 24.00 | 8.00 | 4.34 |
| P17-GCP-0676 | P17 S | 730225 | 1342662 | 263 | -50 | 270 | 40 | 37.00 | 40.00 | 3.00 | 2.68 |
| P17-GCP-0677 | P17 S | 730237 | 1342662 | 262 | -50 | 270 | 39 | 27.00 | 33.00 | 6.00 | 1.39 |
| P17-GCP-0678 | P17 S | 730250 | 1342662 | 262 | -50 | 270 | 38 | 5.00 | 11.00 | 6.00 | 1.06 |
| P17-GCP-0679 | P17 S | 730262 | 1342662 | 262 | -50 | 270 | 38 | 19.00 | 24.00 | 5.00 | 3.24 |
| P17-GCP-0680 | P17 S | 730275 | 1342662 | 262 | -50 | 270 | 38 | 32.00 | 34.00 | 2.00 | 3.96 |
| P17-GCP-0681 | P17 S | 730132 | 1342655 | 263 | -50 | 270 | 14 | NSR | |||
| P17-GCP-0682 | P17 S | 730138 | 1342656 | 263 | -50 | 270 | 21 | 5.00 | 11.00 | 6.00 | 1.12 |
| P17-GCP-0683 | P17 S | 730145 | 1342656 | 262 | -50 | 270 | 27 | 14.00 | 16.00 | 2.00 | 1.04 |
| P17-GCP-0684 | P17 S | 730151 | 1342656 | 262 | -50 | 270 | 31 | 6.00 | 10.00 | 4.00 | 1.37 |
| P17-GCP-0685 | P17 S | 730157 | 1342656 | 262 | -50 | 270 | 36 | 9.00 | 17.00 | 8.00 | 1.52 |
| P17-GCP-0686 | P17 S | 730164 | 1342656 | 262 | -50 | 270 | 40 | 7.00 | 11.00 | 4.00 | 0.71 |
| P17-GCP-0687 | P17 S | 730170 | 1342656 | 262 | -50 | 270 | 40 | 4.00 | 21.00 | 17.00 | 3.86 |
| P17-GCP-0688 | P17 S | 730176 | 1342656 | 263 | -50 | 270 | 40 | 7.00 | 22.00 | 15.00 | 2.14 |
| P17-GCP-0689 | P17 S | 730182 | 1342656 | 263 | -50 | 270 | 40 | 11.00 | 15.00 | 4.00 | 2.28 |
| P17-GCP-0690 | P17 S | 730188 | 1342656 | 263 | -50 | 270 | 35 | NSR | |||
| P17-GCP-0691 | P17 S | 730194 | 1342656 | 263 | -50 | 270 | 38 | 14.00 | 31.00 | 17.00 | 2.14 |
| P17-GCP-0692 | P17 S | 730201 | 1342656 | 263 | -50 | 270 | 40 | 4.00 | 9.00 | 5.00 | 1.00 |
| P17-GCP-0693 | P17 S | 730207 | 1342656 | 263 | -50 | 270 | 40 | 5.00 | 26.00 | 21.00 | 1.16 |
| P17-GCP-0694 | P17 S | 730213 | 1342656 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0695 | P17 S | 730220 | 1342656 | 264 | -50 | 270 | 40 | ARP | |||
| P17-GCP-0696 | P17 S | 730226 | 1342656 | 263 | -50 | 270 | 40 | 16.00 | 23.00 | 7.00 | 4.94 |
| P17-GCP-0697 | P17 S | 730232 | 1342656 | 263 | -50 | 270 | 36 | 18.00 | 25.00 | 7.00 | 2.34 |
| P17-GCP-0698 | P17 S | 730239 | 1342656 | 262 | -50 | 270 | 40 | 27.00 | 30.00 | 3.00 | 3.30 |
| P17-GCP-0699 | P17 S | 730245 | 1342656 | 262 | -50 | 270 | 40 | 1.00 | 6.00 | 5.00 | 1.07 |
| P17-GCP-0700 | P17 S | 730251 | 1342656 | 262 | -50 | 270 | 40 | 7.00 | 13.00 | 6.00 | 2.17 |
| P17-GCP-0700 | P17 S | 730251 | 1342656 | 262 | -50 | 270 | 40 | 20.00 | 21.00 | 1.00 | 1.46 |
| P17-GCP-0701 | P17 S | 730257 | 1342656 | 262 | -50 | 270 | 40 | 14.00 | 19.00 | 5.00 | 1.45 |
| P17-GCP-0702 | P17 S | 730263 | 1342656 | 262 | -50 | 270 | 40 | 19.00 | 21.00 | 2.00 | 2.04 |
| P17-GCP-0702 | P17 S | 730263 | 1342656 | 262 | -50 | 270 | 40 | 36.00 | 40.00 | 4.00 | 7.36 |
| P17-GCP-0703 | P17 S | 730269 | 1342656 | 262 | -50 | 270 | 40 | 25.00 | 27.00 | 2.00 | 3.09 |
| P17-GCP-0704 | P17 S | 730276 | 1342656 | 261 | -50 | 270 | 40 | 32.00 | 35.00 | 3.00 | 1.45 |
| P17-GCP-0705 | P17 S | 730131 | 1342650 | 264 | -50 | 270 | 10 | NSR | |||
| P17-GCP-0706 | P17 S | 730138 | 1342650 | 264 | -50 | 270 | 16 | 6.00 | 8.00 | 2.00 | 2.25 |
| P17-GCP-0707 | P17 S | 730154 | 1342650 | 264 | -50 | 270 | 31 | 3.00 | 10.00 | 7.00 | 1.57 |
| P17-GCP-0708 | P17 S | 730183 | 1342650 | 263 | -50 | 270 | 40 | 9.00 | 15.00 | 6.00 | 1.88 |
| P17-GCP-0709 | P17 S | 730240 | 1342650 | 262 | -50 | 270 | 40 | 26.00 | 29.00 | 3.00 | 3.15 |
| P17-GCP-0710 | P17 S | 730257 | 1342650 | 262 | -50 | 270 | 40 | 14.00 | 18.00 | 4.00 | 1.36 |
| P17-GCP-0710 | P17 S | 730257 | 1342650 | 262 | -50 | 270 | 40 | 30.00 | 40.00 | 10.00 | 4.25 |
| P17-GCP-0711 | P17 S | 730272 | 1342650 | 261 | -50 | 270 | 40 | 27.00 | 33.00 | 6.00 | 1.51 |
| P17-GCP-0711 | P17 S | 730272 | 1342650 | 261 | -50 | 270 | 40 | 37.00 | 40.00 | 3.00 | 4.41 |
| P17-GCP-0712 | P17 S | 730138 | 1342643 | 263 | -50 | 270 | 10 | NSR | |||
| P17-GCP-0713 | P17 S | 730144 | 1342643 | 262 | -50 | 270 | 18 | NSR | |||
| P17-GCP-0714 | P17 S | 730150 | 1342643 | 262 | -50 | 270 | 24 | 4.00 | 6.00 | 2.00 | 0.75 |
| P17-GCP-0715 | P17 S | 730156 | 1342643 | 262 | -50 | 270 | 28 | 9.00 | 10.00 | 1.00 | 1.47 |
| P17-GCP-0716 | P17 S | 730162 | 1342643 | 262 | -50 | 270 | 34 | 6.00 | 9.00 | 3.00 | 2.64 |
| P17-GCP-0717 | P17 S | 730168 | 1342643 | 262 | -50 | 270 | 38 | 8.00 | 11.00 | 3.00 | 2.10 |
| P17-GCP-0718 | P17 S | 730175 | 1342643 | 262 | -50 | 270 | 38 | 3.00 | 10.00 | 7.00 | 1.96 |
| P17-GCP-0719 | P17 S | 730181 | 1342643 | 262 | -50 | 270 | 38 | 7.00 | 11.00 | 4.00 | 2.89 |
| P17-GCP-0720 | P17 S | 730187 | 1342643 | 263 | -50 | 270 | 38 | 13.00 | 24.00 | 11.00 | 3.57 |
| P17-GCP-0721 | P17 S | 730194 | 1342644 | 263 | -50 | 270 | 38 | 14.00 | 16.00 | 2.00 | 1.23 |
| P17-GCP-0722 | P17 S | 730200 | 1342643 | 262 | -50 | 270 | 38 | 0.00 | 12.00 | 12.00 | 2.67 |
| P17-GCP-0723 | P17 S | 730206 | 1342643 | 262 | -50 | 270 | 38 | 11.00 | 28.00 | 17.00 | 3.91 |
| P17-GCP-0724 | P17 S | 730212 | 1342643 | 263 | -50 | 270 | 38 | 5.00 | 10.00 | 5.00 | 2.41 |
| P17-GCP-0724 | P17 S | 730212 | 1342643 | 263 | -50 | 270 | 38 | 21.00 | 35.00 | 14.00 | 4.59 |
| P17-GCP-0725 | P17 S | 730218 | 1342643 | 263 | -50 | 270 | 38 | 8.00 | 13.00 | 5.00 | 6.34 |
| P17-GCP-0726 | P17 S | 730225 | 1342643 | 263 | -50 | 270 | 38 | 9.00 | 16.00 | 7.00 | 1.55 |
| P17-GCP-0727 | P17 S | 730231 | 1342643 | 263 | -50 | 270 | 26 | 15.00 | 20.00 | 5.00 | 3.39 |
| P17-GCP-0728 | P17 S | 730238 | 1342643 | 262 | -50 | 270 | 32 | 7.00 | 8.00 | 1.00 | 1.65 |
| P17-GCP-0729 | P17 S | 730243 | 1342643 | 262 | -50 | 270 | 38 | 3.00 | 5.00 | 2.00 | 1.12 |
| P17-GCP-0730 | P17 S | 730250 | 1342643 | 262 | -50 | 270 | 38 | 8.00 | 10.00 | 2.00 | 5.89 |
| P17-GCP-0731 | P17 S | 730256 | 1342643 | 262 | -50 | 270 | 38 | 12.00 | 16.00 | 4.00 | 3.38 |
| P17-GCP-0731 | P17 S | 730256 | 1342643 | 262 | -50 | 270 | 38 | 28.00 | 38.00 | 10.00 | 2.85 |
| P17-GCP-0732 | P17 S | 730262 | 1342643 | 262 | -50 | 270 | 38 | 18.00 | 20.00 | 2.00 | 1.83 |
| P17-GCP-0734 | P17 S | 730163 | 1342637 | 262 | -50 | 270 | 10 | NSR | |||
| P17-GCP-0735 | P17 S | 730175 | 1342637 | 262 | -50 | 270 | 16 | 8.00 | 11.00 | 3.00 | 1.94 |
| P17-GCP-0736 | P17 S | 730188 | 1342637 | 263 | -50 | 270 | 23 | 10.00 | 23.00 | 13.00 | 2.16 |
| P17-GCP-0737 | P17 S | 730200 | 1342637 | 262 | -50 | 270 | 31 | 3.00 | 6.00 | 3.00 | 4.36 |
| P17-GCP-0737 | P17 S | 730200 | 1342637 | 262 | -50 | 270 | 31 | 14.00 | 19.00 | 5.00 | 1.70 |
| P17-GCP-0738 | P17 S | 730212 | 1342637 | 262 | -50 | 270 | 36 | 4.00 | 7.00 | 3.00 | 0.88 |
| P17-GCP-0739 | P17 S | 730224 | 1342637 | 263 | -50 | 270 | 39 | 8.00 | 12.00 | 4.00 | 1.88 |
| P17-GCP-0740 | P17 S | 730239 | 1342637 | 262 | -50 | 270 | 31 | 23.00 | 26.00 | 3.00 | 2.15 |
| P17-GCP-0741 | P17 S | 730250 | 1342637 | 262 | -50 | 270 | 38 | ARP | |||
| P17-GCP-0742 | P17 S | 730262 | 1342637 | 262 | -50 | 270 | 38 | 17.00 | 19.00 | 2.00 | 1.02 |
| P17-GCP-0742 | P17 S | 730262 | 1342637 | 262 | -50 | 270 | 38 | 25.00 | 38.00 | 13.00 | 3.72 |
| P17-GCP-0743 | P17 S | 730274 | 1342637 | 262 | -50 | 270 | 29 | NSR | |||
| P17-GCP-0744 | P17 S | 730173 | 1342631 | 264 | -50 | 270 | 13 | NSR | |||
| P17-GCP-0746 | P17 S | 730186 | 1342631 | 263 | -50 | 270 | 20 | 10.00 | 15.00 | 5.00 | 1.18 |
| P17-GCP-0747 | P17 S | 730192 | 1342631 | 262 | -50 | 270 | 24 | 3.00 | 5.00 | 2.00 | 1.78 |
| P17-GCP-0748 | P17 S | 730199 | 1342631 | 262 | -50 | 270 | 27 | 2.00 | 19.00 | 17.00 | 3.12 |
| P17-GCP-0749 | P17 S | 730205 | 1342631 | 262 | -50 | 270 | 28 | 6.00 | 21.00 | 15.00 | 5.55 |
| P17-GCP-0750 | P17 S | 730211 | 1342631 | 262 | -50 | 270 | 27 | 16.00 | 22.00 | 6.00 | 7.74 |
| P17-GCP-0751 | P17 S | 730216 | 1342631 | 262 | -50 | 270 | 30 | NSR | |||
| P17-GCP-0752 | P17 S | 730223 | 1342631 | 263 | -50 | 270 | 33 | 6.00 | 12.00 | 6.00 | 3.59 |
| P17-GCP-0753 | P17 S | 730230 | 1342631 | 263 | -50 | 270 | 26 | 13.00 | 18.00 | 5.00 | 2.35 |
| P17-GCP-0754 | P17 S | 730236 | 1342631 | 263 | -50 | 270 | 29 | 16.00 | 25.00 | 9.00 | 1.55 |
| P17-GCP-0755 | P17 S | 730242 | 1342631 | 262 | -50 | 270 | 33 | 12.00 | 13.00 | 1.00 | 1.39 |
| P17-GCP-0756 | P17 S | 730248 | 1342631 | 262 | -50 | 270 | 37 | ARP | |||
| P17-GCP-0757 | P17 S | 730261 | 1342631 | 262 | -50 | 270 | 38 | ARP | |||
| P17-GCP-0758 | P17 S | 730267 | 1342631 | 262 | -50 | 270 | 38 | ARP | |||
| P17-GCP-0760 | P17 S | 730203 | 1342625 | 262 | -50 | 270 | 23 | 2.00 | 18.00 | 16.00 | 3.90 |
| P17-GCP-0761 | P17 S | 730211 | 1342625 | 262 | -50 | 270 | 24 | 13.00 | 19.00 | 6.00 | 4.91 |
| P17-GCP-0762 | P17 S | 730224 | 1342625 | 263 | -50 | 270 | 17 | 7.00 | 11.00 | 4.00 | 3.20 |
| P17-GCP-0763 | P17 S | 730237 | 1342625 | 263 | -50 | 270 | 27 | 20.00 | 22.00 | 2.00 | 1.95 |
| P17-GCP-0764 | P17 S | 730249 | 1342625 | 262 | -50 | 270 | 34 | NSR | |||
| P17-GCP-0765 | P17 S | 730256 | 1342625 | 262 | -50 | 270 | 38 | NSR | |||
| P17-GCP-0766 | P17 S | 730181 | 1342618 | 264 | -50 | 270 | 13 | NSR | |||
| P17-GCP-0767 | P17 S | 730188 | 1342618 | 262 | -50 | 270 | 16 | ARP | |||
| P17-GCP-0768 | P17 S | 730194 | 1342618 | 262 | -50 | 270 | 19 | 2.00 | 14.00 | 12.00 | 3.09 |
| P17-GCP-0769 | P17 S | 730200 | 1342619 | 262 | -50 | 270 | 22 | 3.00 | 14.00 | 11.00 | 5.37 |
| P17-GCP-0770 | P17 S | 730206 | 1342618 | 262 | -50 | 270 | 20 | 7.00 | 15.00 | 8.00 | 7.14 |
| P17-GCP-0771 | P17 S | 730212 | 1342618 | 262 | -50 | 270 | 22 | NSR | |||
| P17-GCP-0772 | P17 S | 730225 | 1342618 | 263 | -50 | 270 | 13 | NSR | |||
| P17-GCP-0773 | P17 S | 730231 | 1342618 | 263 | -50 | 270 | 22 | 15.00 | 16.00 | 1.00 | 2.61 |
| P17-GCP-0774 | P17 S | 730237 | 1342618 | 263 | -50 | 270 | 26 | 6.00 | 7.00 | 1.00 | 7.47 |
| P17-GCP-0775 | P17 S | 730243 | 1342619 | 262 | -50 | 270 | 29 | 16.00 | 27.00 | 11.00 | 2.80 |
| P17-GCP-0776 | P17 S | 730250 | 1342618 | 262 | -50 | 270 | 32 | ARP | |||
| P17-GCP-0777 | P17 S | 730256 | 1342618 | 262 | -50 | 270 | 35 | ARP | |||
| P17-GCP-0778 | P17 S | 730262 | 1342618 | 262 | -50 | 270 | 38 | ARP | |||
| P17-GCP-0779 | P17 S | 730186 | 1342612 | 262 | -50 | 270 | 13 | 3.00 | 6.00 | 3.00 | 1.30 |
| P17-GCP-0780 | P17 S | 730200 | 1342612 | 262 | -50 | 270 | 19 | 4.00 | 10.00 | 6.00 | 5.69 |
| P17-GCP-0781 | P17 S | 730210 | 1342612 | 262 | -50 | 270 | 19 | NSR | |||
| P17-GCP-0782 | P17 S | 730224 | 1342612 | 262 | -50 | 270 | 19 | ARP | |||
| P17-GCP-0783 | P17 S | 730242 | 1342612 | 262 | -50 | 270 | 25 | 3.00 | 6.00 | 3.00 | 1.01 |
| P17-GCP-0784 | P17 S | 730188 | 1342605 | 262 | -50 | 270 | 13 | ARP | |||
| P17-GCP-0785 | P17 S | 730193 | 1342607 | 262 | -50 | 270 | 13 | 3.00 | 9.00 | 6.00 | 2.00 |
| P17-GCP-0786 | P17 S | 730200 | 1342606 | 262 | -50 | 270 | 14 | 4.00 | 8.00 | 4.00 | 4.52 |
| P17-GCP-0787 | P17 S | 730206 | 1342606 | 262 | -50 | 270 | 13 | 8.00 | 11.00 | 3.00 | 1.27 |
| P17-GCP-0788 | P17 S | 730225 | 1342606 | 262 | -50 | 270 | 9 | NSR | |||
| P17-GCP-0789 | P17 S | 730231 | 1342606 | 262 | -50 | 270 | 15 | 3.00 | 13.00 | 10.00 | 2.20 |
| P17-GCP-0790 | P17 S | 730237 | 1342606 | 262 | -50 | 270 | 20 | 7.00 | 13.00 | 6.00 | 3.53 |
| P17-GCP-0791 | P17 S | 730243 | 1342606 | 262 | -50 | 270 | 23 | 3.00 | 16.00 | 13.00 | 4.04 |
| P17-GCP-0792 | P17 S | 730250 | 1342606 | 262 | -50 | 270 | 26 | 7.00 | 11.00 | 4.00 | 3.47 |
| P17-GCP-0793 | P17 S | 730257 | 1342606 | 262 | -50 | 270 | 31 | NSR | |||
| P17-GCP-0794 | P17 S | 730262 | 1342606 | 262 | -50 | 270 | 36 | NSR | |||
| P17-GCP-0796 | P17 S | 730231 | 1342600 | 262 | -50 | 270 | 9 | ARP | |||
| P17-GCP-0797 | P17 S | 730242 | 1342600 | 262 | -50 | 270 | 18 | 2.00 | 11.00 | 9.00 | 5.32 |
| P17-GCP-0798 | P17 S | 730252 | 1342600 | 262 | -50 | 270 | 28 | NSR | |||
| P17-GCP-0799 | P17 S | 730181 | 1342593 | 263 | -50 | 270 | 38 | NSR | |||
| P17-GCP-0800 | P17 S | 730161 | 1342806 | 262 | -50 | 270 | 33 | NSR | |||
| P17-GCP-0801 | P17 S | 730157 | 1342799 | 262 | -50 | 270 | 25 | 16.00 | 18.00 | 2.00 | 0.86 |
| P17-GCP-0802 | P17 S | 730169 | 1342793 | 262 | -50 | 270 | 39 | 26.00 | 28.00 | 2.00 | 2.75 |
| P17-GCP-0803 | P17 S | 730181 | 1342793 | 262 | -50 | 270 | 39 | NSR | |||
| P17-GCP-0804 | P17 S | 730163 | 1342787 | 263 | -50 | 270 | 33 | NSR | |||
| P17-GCP-0805 | P17 S | 730155 | 1342781 | 263 | -50 | 270 | 28 | NSR | |||
| P17-GCP-0806 | P17 S | 730161 | 1342781 | 263 | -50 | 270 | 33 | 20.00 | 22.00 | 2.00 | 1.34 |
| P17-GCP-0807 | P17 S | 730167 | 1342781 | 263 | -50 | 270 | 37 | 22.00 | 23.00 | 1.00 | 2.00 |
| P17-GCP-0808 | P17 S | 730156 | 1342768 | 263 | -50 | 270 | 19 | 6.00 | 7.00 | 1.00 | 9.38 |
| P17-GCP-0809 | P17 S | 730162 | 1342768 | 263 | -50 | 270 | 28 | NSR | |||
| P17-GCP-0810 | P17 S | 730168 | 1342768 | 263 | -50 | 270 | 26 | 22.00 | 23.00 | 1.00 | 7.94 |
| P17-GCP-0811 | P17 S | 730174 | 1342768 | 263 | -50 | 270 | 29 | NSR | |||
| P17-GCP-0812 | P17 S | 730149 | 1342762 | 263 | -50 | 270 | 40 | 1.00 | 2.00 | 1.00 | 1.50 |
| P17-GCP-0813 | P17 S | 730156 | 1342762 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0814 | P17 S | 730162 | 1342762 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0815 | P17 S | 730163 | 1342756 | 263 | -50 | 270 | 40 | NSR | |||
| P17-GCP-0816 | P17 S | 730169 | 1342756 | 263 | -50 | 270 | 40 | NSR |
* Mineralized intervals are reported as downhole lengths. True widths of mineralization are between 75-80% of drilled lengths.
**Composite parameters: 0.45g/t Au cut-off with maximum 3m of internal dilution. No top cut applied.
***Assay Results Pending (ARP), No Significant Result (NSR).
About Orezone Gold Corporation
Orezone Gold Corporation (TSX: ORE, ASX: ORE, OTCQX: ORZCF) is a West African gold producer engaged in mining, developing, and exploring its 85%-owned flagship Bomboré Gold Mine in Burkina Faso. Construction of the stage 1 hard rock expansion is substantially complete, with first gold expected in early December. Combined production from the oxide and stage 1 hard rock operations is forecasted to total between 170,000 and 185,000 ounces in 2026.[2] The Company is also advancing the stage 2 hard rock expansion, which is forecasted to increase annual production to between 220,000 and 250,000 ounces.[3]
The technical report entitled Bomboré Phase II Expansion, Definitive Feasibility Study is available on SEDAR+ and the Company’s website.
Prompts
Click prompts to add them under the company line, click again to take one out, then copy the result into your AI chat. Shared by Asian Century Stocks and Uncovered Thai Stocks. Thank you.
ETFs Holding Orezone Gold Corporation
Exchange-traded funds whose newest published daily portfolio holds one of the company's listings, largest weight first.
| ETF | Weight in ETF | Shares | Market value | As of |
|---|---|---|---|---|
| GDMN | 0.08% | 94,795 | $ 183.942K | Aug 31, 2026 |
| AVDV | 0.07% | 8,329,233 | $ 13.746M | Nov 16, 2026 |
| AVSD | 0.03% | 66,155 | $ 109.175K | Nov 16, 2026 |
| AVDS | 0.03% | 63,128 | $ 104.18K | Nov 16, 2026 |
| DFIS | 0.01% | 413,483 | $ 768.286K | Nov 12, 2026 |
| AVDE | 0.01% | 1,042,613 | $ 1.721M | Nov 16, 2026 |
| DXIV | 0.00% | 4,100 | $ 7,618.15 | Nov 12, 2026 |
| DISV | 0.00% | 78,422 | $ 145.715K | Nov 12, 2026 |
| DFAX | 0.00% | 65,500 | $ 121.705K | Nov 12, 2026 |


















