|
Nova Minerals Limited is a mining exploration and development company focused on gold, antimony, and critical minerals. The company's principal activity is advancing its flagship Estelle Project in Alaska's Tintina Gold Belt. The project features a dual commodity strategy targeting both gold and antimony, with specific assets including the RPM, Korbel, Stibium, Styx, Muddy Creek, and Wombat prospects. Nova is progressing a Pre-Feasibility Study for a starter mine at RPM and an updated scoping study for the broader Estelle project. The company is also advancing U.S. government grant initiatives to accelerate the development of its antimony assets into near-term production, aiming to secure a domestic supply chain for the strategic mineral. Nova Minerals is dual-listed on the NYSE American and the ASX. Summarised from the company's own disclosures, fiscal year ended Jun 2025 |
Industry Materials | Homepage novamineralscorp.com |
| Sector Basic Materials | IR page — | |
|
Tags
mining exploration, gold mining, antimony mining, critical minerals, pre-feasibility study, drilling programs, resource estimation, alaska mining, Estelle Project, RPM, Korbel, Stibium, Styx, Muddy Creek, Wombat, RFC Ambrian, Tintina Gold Belt
|
Press page — |
Metrics
| Valuation | |
|---|---|
| Market cap | A$ 231.458M |
| Market cap (USD) | $ 155.889M |
| P/E | -11.35 |
| PEG | — |
| P/BV | 1.47 |
| P/S | — |
| P/OCF | -30.29 |
| P/FCF | — |
| Dividend yield | — |
| Turnover / mcap | — |
| Returns | |
|---|---|
| ROE | -10.2% |
| ROI | -9.6% |
| ROIC | -9.6% |
| Profit margin | — |
| Growth | |
|---|---|
| Revenue growing | Yes |
| Profits growing | Yes |
| Revenue up 3y | No |
| Revenue up 5y | — |
| Earnings growth 3y (net profit CAGR) | — |
| Quality | |
|---|---|
| Profitable | No |
| Margin expanding | Yes |
| Buying back stock | No |
| Diluting (TTM) | — |
| Debt/Equity | 5.5% |
| Podcast bulls (TTM) | Sign up |
| Podcast bears (TTM) | Sign up |
| Podcast sentiment (TTM) | Sign up |
| Podcast sentiment % (TTM) | Sign up |
| News sentiment (TTM) | 0 |
| Quality score | 7.1% |
| Insiders | |
|---|---|
| Buys, 1w | Sign up |
| Buys, 1m | Sign up |
| Buys, 1y | Sign up |
| Sells, 1w | Sign up |
| Sells, 1m | Sign up |
| Sells, 1y | Sign up |
Podcast Mentions
Announcements lodged with ASX, newest first, routine forms (director and substantial-holding notices, daily buy-back and quotation notices) included. The link opens the announcement on ASX. Material events reported to the SEC on Form 8-K or 6-K, newest first. The link opens the filing itself on EDGAR. Press releases from the company's own website, newest first.
Anchorage, Alaska, November 13, 2026 – Nova Minerals Corp (“Nova” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to report its financial and operational results for the quarter ended September 30, 2026, highlighting continued advancement of its flagship Estelle Gold and Critical Minerals Project in Alaska, with significant progress towards establishing a vertically integrated U.S. domestic antimony supply chain.
Quarterly Highlights
● Advancing towards 2027 production: Progressed engineering, metallurgical test work, equipment procurement and site preparations, with approximately 500 tons of processing and refining equipment delivered to Port MacKenzie as of the end of the quarter, and early earthworks underway.
● $43.4 million Department of War award: As of the end of the quarter, approximately $23.9 million of the DOW award was received, with an additional milestone achieved and $5.0 million invoiced subsequent to the end of the quarter. The remaining funding is subject to achievement of applicable program milestones and expected to be received by the end of fiscal year 2027.
Anchorage, Alaska, November 10, 2026 – Nova Minerals Corp (“Nova” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to announce that an engineering and processing capacity assessment of its newly acquired processing plant, which is to be constructed at Port MacKenzie, Alaska, has confirmed front-end crushing, grinding and concentration capacity of approximately 216,000 tonnes per annum (tpa). This substantial processing capacity provides a scalable platform for future commercial antimony production, with capacity modelling indicating potential refined antimony production of up to approximately 20,000 tpa, subject to feed grade, additional downstream refinery equipment and other operating requirements.
The processing infrastructure provides a strong foundation for Nova’s strategy to establish a fully integrated U.S. domestic antimony and critical minerals processing and refining hub in Alaska, with the capability to produce both antimony metal and antimony trisulphide.
NEWS RELEASE
Nova Minerals Secures Final Permits for Alaska Antimony Project, Clearing Path to 2027 Production 2026-10-27 Anchorage, Alaska, Oct. 27, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) today announced it has received nal approvals from the Alaska Department of Natural Resources for the Plan of Operations and Reclamation Plan for its Department of War funded Alaska antimony project, completing the Project’s permitting process and clearing the way for construction and development activities targeting production in 2027.
Highlights Final permits secured: Nova has secured all required permits within approximately three months of submission clearing the way for Phase 1 of its Alaska antimony development and advancing the establishment of the rst modern, fully integrated U.S. domestic antimony supply chain in decades. Three-stage project approval from mining to re ning: Permits cover stibnite mining at the Styx and Stibium prospects, ore sorting and processing at the Whiskey Bravo concentration site within the Estelle Project, and downstream processing and re ning at Port Mackenzie. $43.4 million in Department of War funding: Phase 1 is fully funded through the Company’s existing award to support development of domestic production capacity for military-grade antimony trisul de. Critical equipment delivered: All major long-lead and critical mining and processing equipment has been 1
procured and delivered to project locations. Engineering and metallurgy completed: Process plant engineering and metallurgical test work have established a
owsheet designed to produce military-grade antimony trisul de and standard grade II
antimony metal (>99.65% Sb). Targeting 2027 production: With permitting complete, funding secured, engineering completed and equipment delivered, Nova is focused on advancing construction and executing its development schedule.
Nova Minerals CEO, Mr. Christopher Gerteisen, commented: "Securing our nal permits is a major milestone for Nova, moving our Alaska antimony project from development planning toward construction and targeted production in 2027. “In a relatively short period, we have secured $43.4 million in Department of War funding, completed the permitting process, advanced engineering and metallurgical test work, and delivered critical equipment to our project locations. “With these key milestones achieved, our focus is now on execution. We believe the Project has the potential to contribute to a more secure U.S. domestic antimony supply chain, while creating a meaningful new growth opportunity for Nova and our shareholders.”
From Permitting to Project Execution The nal approvals authorize construction and operating activities over an initial three-year term across the Project’s integrated development pathway. This includes stibnite mining at the Styx and Stibium prospects, intermediate-stage ore sorting and processing at the Whiskey Bravo concentration site within the Estelle Project, and downstream processing and re ning at Port Mackenzie, Alaska. The Company’s Phase 1 development program is supported by a $43.4 million award from the U.S. Department of War to advance domestic antimony production capacity. Metallurgical test work and process plant engineering have been completed, with the process owsheet designed to support production of military-grade antimony trisul de and standard grade II antimony metal (>99.65% Sb). All major long-lead and critical mining and processing equipment has been procured and delivered to project sites, enabling Nova to accelerate construction and advance project development. With nal regulatory approvals secured and major development milestones already achieved, Nova is transitioning 2
to the next phase of execution as it advances toward targeted antimony production in 2027.
About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a US domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world’s largest gold mines and discoveries including Kinross Gold Corporation’s Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a $43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in 2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.
Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will,” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forwardlooking statements are based on assumptions as to future events that may not prove to be accurate. Forwardlooking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law.
Nova Minerals’ direct rail siding at Port Mackenzie will enable shipments of antimony and other critical minerals ore and concentrate feedstock to seamlessly move from the Alaskan interior and the region directly to its planned antimony and critical minerals processing and refining hub at Port MacKenzie via the new rail extension (Figure 2).
Nova Minerals CEO Christopher Gerteisen joined Secretary of the U.S. Department of Transport Sean Duffy, US Senator for Alaska Dan Sullivan, and US Representative for Alaska Nick Begich, US House Natural Resouces Committee Chairman Rep. Bruce Westerman, and Matsu Borough Mayor Edna Devries, for the announcement at Port MacKenzie on October 19 (Figure 3).
Highlights
● U.S. Department of Transportation Secretary Sean Duffy announced $249 million federal grant for completion of the final stages of the Port MacKenzie Rail Extension. The award covers around 80 percent of the $311 million project, with state and local partners contributing the remaining $62 million.
NEWS RELEASE
U.S. Government Commits Nearly $250 Million to Port Mackenzie Rail Infrastructure, Supporting Alaska’s Resource development and providing a direct transport link to Nova Minerals planned critical minerals processing and re ning hub. 2026-10-21 Anchorage, Alaska, Oct. 21, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) welcomes the U.S. Government’s $249 million investment to complete the nal stages of the Port MacKenzie Rail Extension, providing a key transportation link intended to support the development and movement of critical minerals within the region. The funding will deliver a new the 32-mile rail line connecting Port MacKenzie, Alaska, to the Alaska Railroad Corporation’s main line (Figure 1). Nova Minerals’ direct rail siding at Port Mackenzie will enable shipments of antimony and other critical minerals ore and concentrate feedstock to seamlessly move from the Alaskan interior and the region directly to its planned antimony and critical minerals processing and re ning hub at Port MacKenzie via the new rail extension (Figure 2). Nova Minerals CEO Christopher Gerteisen joined Secretary of the U.S. Department of Transport Sean Du y, US Senator for Alaska Dan Sullivan, and US Representative for Alaska Nick Begich, US House Natural Resouces 1
Committee Chairman Rep. Bruce Westerman, and Matsu Borough Mayor Edna Devries, for the announcement at Port MacKenzie on October 19 (Figure 3).
Highlights U.S. Department of Transportation Secretary Sean Du y announced $249 million federal grant for completion of the nal stages of the Port MacKenzie Rail Extension. The award covers around 80 percent of the $311 million project, with state and local partners contributing the remaining $62 million. The Extension will link Alaska Railroad Corporation’s main line with Port MacKenzie, home to Nova’s planned antimony processing and re ning facility, while enhancing transportation access for resource development projects across Alaska and the region. This commitment is the latest in a series of infrastructure investments in the region, including $7.8 million to enhance the port’s capacity for barge haul-out and loading operations, $34 million investment to support the expansion of the port, multi-billion funding commitments by Asian o take partners to advance the Alaska LNG project recently announced by the Trump administration, and progress accelerating with funding, permitting, and studies completed in support of near term development of the West Susitna Access Road Project which tie into Nova Minerals Estelle Gold and Critical Minerals Project. “We are going to move this grant at Trump speed,” Secretary Du y said. “What that means is we want to get this out by spring. We want to be turning dirt. Alaska is America’s natural resource powerhouse, but the state needs strong infrastructure to get those resources from point A to point B safely, reliably and e ciently,” Secretary Du y said. “Thanks to President Trump and the entire Alaska delegation, we’re building a massive new rail supply line that will power the energy and critical mineral projects of the future. This landmark investment will generate an economic boom for the region, unleash American energy dominance, and enhance our national security.” Senator Sullivan said this was another important step toward unlocking Alaska’s extraordinary mineral resource potential. “Alaska has enormous deposits of critical minerals, world-class energy projects, and a strategic location at the crossroads of the world. But having these resources isn’t enough. We need the infrastructure to develop them responsibly and get them to market,” Senator Sullivan added. Nova Minerals CEO, and Port MacKenzie Commission Vice-Chair Christopher Gerteisen joined representatives from the U.S. and Alaskan Governments, the Borough, and Port McKenzie for the announcement 2
“Port Mackenzie is a commodity port, the export-import gateway for Alaska minerals and resources to reach US and global markets. This is yet another step forward to deliver the infrastructure necessary for critical minerals projects in Alaska to get their product to market quickly and for equipment and supplies to build and operate projects in Alaska to enter and distribute across our State as e ciently as possible,” Mr Gerteisen said. “Nova Minerals will directly bene t from the speed and e ciency enabled by the Port MacKenzie Rail Extension, with our planned antimony processing and re ning facility situated directly along the extension rail line. “These infrastructure developments are creating the foundations needed to support future critical minerals and mining projects across Alaska. Upgrades to the ports, roads, and power throughout the Mat Su region mean projects like Nova’s Estelle Gold and Critical Minerals site can get into production cheaper and faster. Upgrades to port, transportation and power infrastructure across the Mat-Su region are helping create the conditions needed to advance major resource projects, including Nova's Estelle Gold and critical minerals developments which has been a rst mover and established itself as an anchor industry within the commercial industrial zone Port district. “Nova’s antimony facility will form part of the United States’ rst modern, secure, fully integrated antimony supply chain in decades – from mine to end users in defense, technology and other advanced applications supporting both national and economic security.”
3
Figure 1. The Port MacKenzie Rail Extension will link directly to Nova Minerals’ antimony re nery site and include a rail siding on site 4
Figure 2. The Mat Su Borough infrastructure developments – Port MacKenzie rail spur, West Susitna Access Road, Port upgrades, barge haul out and handling, and power transmission
5
Figure 3. Nova Minerals CEO Christopher Gerteisen (left) with Senator Dan Sullivan (right) at the Port MacKenzie Rail Extension funding announcement in Port MacKenzie, Alaska, October 19, 2026. 6
About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a US domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world’s largest gold mines and discoveries including Kinross Gold Corporation’s Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a $43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in 2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.
Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will,” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forwardlooking statements are based on assumptions as to future events that may not prove to be accurate. Forwardlooking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law.
NEWS RELEASE
Nova Minerals Progresses to Antimony Processing Plant Construction as 2026 Estelle Field Season Concludes 2026-10-08 Anchorage, Alaska, Oct. 08, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to report all key plant equipment for its planned antimony processing and re nery operation arrived at Port MacKenzie, Alaska, on October 6, 2026. The arrival of the nal major pieces of equipment enables construction of the processing and re nery facility to begin in the coming weeks, subject to receipt of the remaining permits. This represents another signi cant milestone in the Company’s plan to establish a secure, vertically integrated U.S. domestic antimony supply chain in Alaska, supported by a $43.4 million award from the U.S. Department of War (DoW). The key equipment shipment arrives as the 2026 eld season at the Estelle Critical Minerals and Gold Project draws to a close, with initial assay results expected in due course. In parallel, construction continues to advance across key infrastructure projects at Estelle, including the Korbel Stibium access road and airstrip expansion. 1
Highlights Additional Key Antimony Plant Equipment Delivered: All remaining antimony processing and re nery equipment has arrived on site. The delivery included two ball mills, a jaw crusher, apron feeder, hydraulic lter presses, and other ancillary equipment required for the antimony recovery process (Figure 1). This follows a 500-ton shipment of processing and re ning equipment that arrived at Port Mackenzie on September 6. Antimony Plant Construction to Commence: Early earthworks are underway at Port MacKenzie (Figure 2), with construction of the antimony processing and re nery facility to commence, following receipt of nal permits. 2026 Field Program Completed: An extensive ~8,000m diamond drilling program at Estelle, which focused on in ll and resource expansion at the RPM gold deposit to advance the Pre-Feasibility Study (PFS), is now complete. The Stibium and Styx antimony prospects are progressing towards potential resource delineation and production. Samples and drill core from the 2026 eld program have been prepared and shipped for analysis, and the Company expects to report results in due course. Estelle Site Infrastructure Construction Continues: The Korbel-Stibium access road (Figure 3) and Whiskey Bravo airstrip expansion (Figure 4) continue to make important progress.
Nova CEO, Mr. Christopher Gerteisen, commented: “This equipment delivery brings Nova Minerals a step closer to establishing a secure, vertically integrated antimony supply chain for the United States domestic market. “The U.S Department of War has designated antimony as a strategic priority for national and economic security, due to its necessity in defense, energy storage, and advanced electronic applications. “While our 2026 eld season, supported by three diamond rigs operating from June through September, has now concluded, activity at both Estelle and Port MacKenzie is continuing at pace. Favorable fall conditions provide an ideal window for earthworks and construction, with these activities set to continue through the winter months.”
Port MacKenzie Antimony Processing and Re nery Facility The remaining shipment of key ore processing and re ning equipment included another 10 truckloads, and follows more than 40 containers that arrived by barge at Port MacKenzie on September 6. Nova sourced modern processing and milling equipment from a recently decommissioned site in North America to accelerate construction and deliver meaningful cost savings, with rst antimony expected in 2027. Early earthworks are underway (Figure 2), with construction of the antimony processing facility, which is designed 2
to process stibnite-bearing material and, initially, produce antimony metal and military grade trisul de as part of the U.S. DoW project, to commence following receipt of nal permits. A modular design provides Nova with the exibility to scale operations over time, and respond to evolving market requirements including building an integrated domestic antimony supply chain within the United States.
Estelle Site Infrastructure Construction Korbel-Stibium Access Road: Construction of the Korbel-Stibium access road is progressing at pace, with the project set to provide year-round overland access to the northern prospects, including the Stibium antimonygold prospect and the Korbel gold deposit, while delivering signi cant cost savings by reducing reliance on helicopter support (Figure 3). Whiskey Bravo Airstrip Expansion: Construction of the Whiskey Bravo airstrip expansion and apron continues, with the aim to upgrade speci cation to suit C-130 Hercules size aircraft (Figure 4). Along with signi cant freight cost savings, the expansion will allow increased freight size and payload capacity from the current 7,000lbs (DC-3) to 42,000lbs (C-130). RPM Road Alignment: The proposed RPM road alignment has been established with initial environmental baseline studies now completed in preparation for permitting application. Onsite Crushing and Ore Sorting Facility: Steel fabrication and site preparation is ongoing at the Whiskey Bravo crushing and ore sorting facility at the Estelle camp. The facility will play a key role in producing a coarse intermediate concentrate for transport to the Port MacKenzie downstream processing and re ning plant, where antimony metal and military grade trisul de will be produced under the $43.4 million DoW award.
2026 Estelle Field Season Completed In parallel to establishing the Port MacKenzie re nery, Nova’s 2026 eld season at Estelle has concluded. Nova completed ~8,000m of drilling, with three diamond core rigs operating around the clock, seven days a week, between June and September to leverage the longer daylight hours over the Alaskan summer. RPM: Several drill pads were established at RPM to focus on in ll and expansion drilling, with approximately 4,200m completed at the deposit with the objective of further delineating the eastern strike extension at RPM North and increasing resource con dence at RPM Valley. Drilling at RPM also included approximately 1,500m of near-deposit expansion targets along the ridgeline north of RPM North where previous surface sampling and geophysics identi ed potential for additional highgrade, RPM-style gold mineralization. 3
Outside of drilling, detailed geologic mapping was undertaken at RPM, as well as surface reconnaissance work between RPM and the Revelation prospect where previous surface sampling returned rock chip assays up to 24.6 grams per tonne gold. Drill samples have been logged, prepared, and shipped to the ALS laboratory for analysis. Korbel: Throughout the 2026 eld season, PFS metallurgical test work, environmental and other technical studies continued at the Korbel deposit. Korbel will comprise a signi cant portion of the ore volume in any future mining scenario at Estelle. Stibium: At the Stibium antimony-gold prospect, Nova completed approximately 800m of targeted drilling across gold and stibnite (antimony) anomalies identi ed in surface sampling, with drilling occurring from a newly-established pad on the south face of the prospect, lower down on the slope and 200m closer to the target zone. Portage Pass: A detailed soils grid was conducted across the Portage Pass valley area with assays anticipated in the coming months. Stoney: One 415m drill hole was drilled at the end of the season targeting the Massive Au-Ag-Cu-Sb bearing Stoney Vein. West Wing: Detailed mapping and sampling were completed at West Wing, with samples sent to ALS and assays expected in the coming months. Train: Two holes were drilled at Train for approximately 475m, targeting a sheeted vein set with high-grade surface samples returning up to 128 g/t Au. Styx: During the eld season, Nova drilled approximately 500m over two holes from the newly constructed drill pad on the eastern side of Styx to test the 1m-thick quartz-stibnite vein at the prospect. In parallel, the Company extracted 100 tons of antimony ore to provide initial feed material for downstream processing and re ning at the Port MacKenzie plant once construction has been completed.
4
Figure 1. Ball mill delivered to Alaska
5
Figure 2. Port MacKenzie antimony processing plant site early earthworks
6
Figure 3. Korbel-Stibium access road construction works
7
Figure 4. Whiskey Bravo airstrip expansion construction works About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a US domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world’s largest gold mines and discoveries including Kinross Gold Corporation’s Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a $43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in 2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com. 8
Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will,” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forwardlooking statements are based on assumptions as to future events that may not prove to be accurate. Forwardlooking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law.
2026-10-02 Anchorage, Alaska, Oct. 02, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to invite shareholders, investors, and the broader market to attend an Investor Webinar for an update on the Company’s recent e orts at its Estelle Gold and Critical Minerals Project in Alaska, and antimony supply chain capabilities. Nova Chief Executive O cer Christopher Gerteisen will present on the Company’s recent progress towards developing antimony processing and re ning capabilities at Port MacKenzie, and ultimately establishing a secure, integrated antimony domestic supply chain funded by a US$43.4 million award from the U.S. Department of War. Mr. Gerteisen will also cover highlights from the recent eld season at Estelle, which is one of North America's largest undeveloped gold assets, with a multi-million-ounce resource and signi cant growth potential. RedChip will be hosting the Investor Webinar. If attendees are unable to join the event on the day of the conference,
an
archived
webcast
will
also
be
made
available
on
the
Company’s
website
www.novamineralscorp.com and YouTube channel. RedChip Companies Webinar Time: 4.15 pm US EDT Wednesday October 7, 2026 7.15 am Australian AEDT Thursday October 8, 2026 1
Registration: To register for the free webinar, please visit: https://www.redchip.com/webinar/NVA/83073728095 Questions: Questions may be submitted in advance to [email protected] Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com
About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a U.S. domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries, including Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in 2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.
Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will,” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forward-looking statements are based on assumptions as to future events that may not prove to be accurate. Forward-looking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty 2
to update such information except as required under applicable law.
Attached to this report on Form 8-K as Exhibit 99.1 is a copy of the corporate presentation of Nova Minerals Limited (the “Company”) dated September 18, 2026, titled “Corporate Presentation” which was also posted to the Company’s corporate website on such date.
The information in this Item 7.01 shall not be incorporated by reference into any registration statement or other document pursuant to the Securities Act of 1933, as amended, except as otherwise expressly stated in such filing.
NEWS RELEASE
Port MacKenzie Industry Day Highlights Nova Minerals’ Antimony Processing and Re ning Project as Anchor for Alaska’s Critical Minerals Future 2026-09-17 Anchorage, Alaska, Sept. 17, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to report that nearly 100 industry, government, transportation, energy, mining, engineering and infrastructure leaders gathered at Port MacKenzie for an Industry Day to tour key port facilities, exchange information and discuss the progress of establishing Port MacKenzie as a strategic critical minerals processing and commodity export hub for Alaska. A central focus of the event was Nova Minerals' antimony processing and re ning project, which is supported by a US$43.4 million award from the U.S. Department of War (DoW). As one of the rst signi cant critical minerals projects advancing within the Port MacKenzie industrial district, Nova Minerals was highlighted as an anchor tenant in Alaska's emerging processing sector. Nova Minerals provided attendees with an update on its planned antimony processing and re ning project, including recent development milestones and the role the facility is expected to play in establishing a domestic antimony supply chain in the United States. Nova Minerals' planned antimony processing and re ning operation is intended to help establish a domestic supply of a critical mineral used in defense, energy, and industrial applications. 1
Port MacKenzie is being developed as the gateway for Alaska's mineral and industrial exports to U.S. and international markets. The district encompasses nearly 10,000 acres of commercially industrial-zoned land, providing space for mineral processing, re ning, logistics, manufacturing, and related support industries. Multimodal transportation connections, including road, rail, utilities, and deep-water port infrastructure, are being advanced to support long-term industrial development. The Industry Day also provided stakeholders with an opportunity to discuss infrastructure projects that could support Nova Minerals and future critical minerals businesses within the Port MacKenzie district. Presentations and question-and-answer sessions addressed the status and development of the West Susitna Access Road, the Port MacKenzie Rail Extension, and the Alaska LNG project, as well as port improvements and grant funding opportunities. Participants and presenters included representatives from: Port MacKenzie - State of the Port and planned infrastructure improvements Matanuska-Susitna Borough - Port grant funding received and applications underway Kevin McCabe, Alaska State Representative, District 30 Alaska Industrial Development and Export Authority (AIDEA) - West Susitna Access Road Alaska Railroad Corporation - Port MacKenzie Rail Extension AIP / Macquarie Bank / Martinus Rail - Port MacKenzie Rail Extension Glenfarne - Alaska LNG project Alaska Department of Transportation and Public Facilities - West Susitna Access Road Nova Minerals - Antimony processing and re ning project Discussions throughout the day underscored the relationship between infrastructure investment and industrial development. Participants highlighted how transportation, energy, and port improvements can help attract new industrial projects while supporting the long-term growth of the district.
Christopher Gerteisen, Nova Minerals CEO, commented: “Nova Minerals is proud to be part of the emerging industrial future at Port MacKenzie. The combination of strategic port infrastructure, transportation access, available industrial land, and proximity to Alaska’s mineral resources provides an opportunity to build a domestic critical minerals supply chain here in Alaska. Our antimony processing and re ning project will serve as an 2
anchor for additional investment and development within the Port MacKenzie industrial district. “As our project continues to advance, we believe Port MacKenzie is uniquely positioned to support critical minerals processing and downstream industrial development. Industry Day provided an opportunity to showcase the progress being made across the district and the growing foundation for future investment, job creation and domestic supply chain development.” The event highlighted growing alignment among government, infrastructure, and industry stakeholders as Port MacKenzie continues to advance its role in Alaska's critical minerals and industrial development strategy.
Governor of Alaska Mike Dunleavy praised Alaska’s growth and leadership in developing a domestic supply of critical minerals. “Industry Day at Port MacKenzie is an important opportunity to showcase Alaska’s ability to support critical mineral development and the infrastructure needed to strengthen our national security and economic future”, said Governor Dunleavy. “I also want to congratulate Nova Minerals on delivering antimony re ning and processing equipment to the port. This is a signi cant step forward in developing an Alaska-based supply chain for a critical mineral, creating jobs and investment while reducing our nation’s dependence on foreign sources. Alaska has the resources, workforce, and strategic location to lead, and we will continue working to ensure projects like this move forward”, he said.
MatSu Borough Port Director, Dave Gri n, provided opening remarks to approximately 100 people at the Industry Day event. “Nova Minerals are working on a pilot project just up the road that we hope will become a larger processing plant”, Gri n said. “Labor Day weekend, we brought in about 44 containers of equipment for that project. People today can drive up the road to see the site.”MatSu Borough Manager Mike Brown stated, “We have received over $100M in recent investments for Port MacKenzie. We are improving roads, utilities, and connections”, he said. “We are excited about working with the industry partners we have like Nova, and it is a bright future for Port MacKenzie”.
3
Figure 1. Nova Minerals CEO, Christoper Gerteisen, presenting to attendees at the Industry Day
4
Figure 2. Attendees gathered at the Port About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a U.S. domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in 2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com. 5
Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will,” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forwardlooking statements are based on assumptions as to future events that may not prove to be accurate. Forwardlooking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law.
NEWS RELEASE
Nova Minerals’ Marches towards Antimony Production with Arrival of Processing & Re ning Equipment in Alaska 2026-09-08 Anchorage, Alaska, Sept. 08, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to report the arrival of approximately 500 tons of equipment in Port MacKenzie, Alaska, to enable the construction of its planned antimony processing and re ning facility. This marks a signi cant milestone in the Company’s e orts to establish a fully secured and integrated domestic supply chain for antimony, funded by a US$43.4 million award from the Department of War under Title III of the Defense Production Act. The shipment included more than 40 containers and multiple oversized loads carrying crushing, ore sorting, milling, otation and re ning equipment. The barge departed Seattle on August 26, arriving in Cook Inlet on September 6. A time lapse video of Nova’s antimony processing plant equipment being unloaded at Port MacKenzie can be viewed at the link below.
1
The delivery of this critical processing equipment represents the culmination of six months of detailed procurement, consolidation, planning and logistics coordination undertaken by the Nova Minerals team. The delivery has advanced Nova Minerals’ antimony strategy ahead of schedule, supporting its plans to develop a processing and re ning facility in Alaska with production targeted for 2027.
Nova Minerals CEO, Mr. Christopher Gerteisen, commented: “The shipment arrived ahead of schedule, which will enable us to get construction underway at speed. By acquiring and transporting modern processing and milling equipment from a recently decommissioned site in North America, rather than starting from scratch, we’ve been able to signi cantly accelerate the path to construction, and ultimately, the production of antimony. This approach has also delivered meaningful capital cost savings. “Antimony is one of the critical minerals recognized by the Department of War as a priority for the United States. It has essential applications in defense, energy storage, and advanced electronics, which is why this project is so important to our national and economic security.
2
“We’re proud to embark on the next phase of development and the construction of the antimony processing facility.”
U.S. Congressman Nick Begich praised the e ort, stating, “The arrival of nearly 500 tons of infrastructure and re ning equipment at Port MacKenzie marks an important rst step toward re ning antimony in the Mat-Su Valley and building a secure, fully domestic supply chain right here in Alaska,” said Congressman Begich. “I applaud the Department of War for recognizing the national security importance of this e ort and investing in American production,” he said. “This is exactly the kind of project we need: Alaska resources, Alaska workers, and American production strengthening our national security.”
Alaska State Rep. Kevin McCabe, whose district includes the areas where Nova Minerals will be operating, was delighted by the landmark occasion. “I could not be more excited to nally see this movement on the part of Nova Minerals,” said Rep. McCabe. “I have watched this project develop, have own to the Estelle area, and I know how many jobs this will create and the stimulus it will provide to the Alaska economy. This is a fabulous stage of development, and Nova's use of Port MacKenzie demonstrates their commitment to the Valley and Alaska.” The Port MacKenzie processing facility is designed to process stibnite-bearing material and, initially, produce antimony trisul de as part of the U.S. Department of War project. The modular design of the facility provides exibility to scale operations over time and potentially expand into the production of additional saleable re ned antimony products, including antimony metal and antimony trioxide. This exibility is intended to allow Nova Minerals to respond to evolving market requirements while building an integrated domestic processing capability in the United States. The Port MacKenzie district provides a strategic location for the Company’s development of a critical minerals re nery. It a ords access to a year-round deepwater port, Alaska’s road and highway system, the West Susitna Access Road, and the Port MacKenzie rail spur that will connect to the Alaska Railroad mainline. These infrastructure advantages are expected to support the movement of materials and products as the project advances toward production.
Mat-Su Borough Mayor Edna DeVries noted the bene ts of the project for the region and its residents. “For some time, the Mat-Su Borough invested in the infrastructure necessary to position Port MacKenzie as an Alaskan 3
industrial center. Seeing re ning and processing equipment arrive at the port is evidence that those investments are paying o ,” she remarked. “This project represents more than a shipment of equipment. It represents jobs, economic diversi cation, valueadded resource development, and a stronger future for Alaska”, said Mayor DeVries.
4
Figure 1. Barge loaded with Nova’s antimony processing equipment arriving at Port MacKenzie
5
Figure 2. Barge unloading at Port MacKenzie
6
Figure 3. 40ft shipping containers loaded onto trucks for the short haul to the Nova Minerals antimony processing plant site
7
Figure 4. Aerial view of Nova Minerals antimony processing plant site which has been prepared ready for construction
8
Figure 5. Aerial view of Port MacKenzie highlighting the site for Nova’s antimony processing plant About Nova Minerals Corp 9
Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a U.S. domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries, including Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in 2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.
Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will,” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forwardlooking statements are based on assumptions as to future events that may not prove to be accurate. Forwardlooking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law.
Figure 1.
9
Proposed route for the West Susitna Access Road. Source AIDEA Figure 2.
10
Geotechnical drilling on the West Susitna Access Road route. Source ADOT&PF Source: Nova Minerals Corp.
11
NEWS RELEASE
Nova Minerals Attends Roundtable with U.S. Department of Energy 2026-08-31 Anchorage, Alaska, Aug. 31, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to report Chief Executive O cer Christopher Gerteisen has attended a roundtable with the United States Department of Energy (“DoE”), where he briefed o cials on the Company’s progress towards establishing an integrated U.S. domestic antimony supply chain from its Estelle Gold and Critical Minerals Project in Alaska, including production of military-grade antimony trisul de.
Highlights Nova CEO Christopher Gerteisen attended a U.S. DoE roundtable at Fairbanks, Alaska, last week, where he briefed o cials on the Company’s progress towards establishing an integrated U.S. supply chain of antimony and production of military-grade antimony trisul de. U.S. Secretary of Energy Chris Wright reiterated the importance of Nova Minerals’ antimony trisul de production from Estelle and the role it will have in supporting the U.S. Government’s domestic critical minerals objectives. Secretary Wright reinforced the DoE’s commitment to supporting Alaskan mining, processing, and re ning operations, with initiatives to augment the state’s power generation and transmission infrastructure. Nova is advancing an integrated antimony mining, processing, and re ning operation in Alaska to provide a 1
secure domestic supply, fully-funded by a US$43.4 million Department of War (DoW) award. On 28 August 2026, Mr. Gerteisen attended a roundtable in Fairbanks, Alaska, alongside DoE o cials, U.S. Secretary of Energy Chris Wright, Senior Advisor Audrey Barrios, and Acting Principal Deputy Assistant Secretary Andy Rapp. The invite-only roundtable also included representatives from the Alaska Miners Association and other Alaskabased mining companies. Secretary Wright reiterated the importance Nova Minerals’ antimony production from Estelle will have in supporting the U.S. Government’s domestic critical minerals objectives. To underpin mining, processing, and re ning operations across Alaska, Secretary Wright discussed the DoE’s incoming initiatives to improve power generation capability and transmission in the state. These DoE initiatives are expected to ensure su cient power supply for Nova’s phase 2 expansion plans for its vertically integrated militarygrade antimony trisul de production strategy. Following Secretary Wright’s opening remarks, Nova CEO Mr. Gerteisen provided o cials with an update on Estelle, where the 2026 eld season is underway, with three diamond drill rigs operating on site 24 hours a day, seven days a week, for the season. In parallel, a barge containing almost 500 tons of crushing, ore sorting, milling, otation, and re ning equipment is expected to arrive early next month at Nova Minerals’ planned antimony trisul de processing and re nery site at Port MacKenzie, Alaska. Construction will commence once the barge arrives, with phase 1 antimony trisul de production scheduled for 2027. Phase 1 of Nova Minerals’ planned antimony trisul de production is fully funded by a US$43.4 million DoW award supporting the establishment of a domestic antimony supply chain. Upon completion, the DoW-funded phase 1 antimony re nery is expected to serve as a strategic U.S. processing and toll-treatment facility capable of producing re ned antimony products for defense, industrial, and critical technology supply chains.
Nova Minerals CEO, Mr Christopher Gerteisen, commented: “Nova Minerals’ participation in the U.S. Department of Energy roundtable emphasizes the strategic importance the U.S Government has placed on our Alaskan Estelle Gold and Critical Minerals Project and its fast-tracked antimony production for the domestic supply chain. “Antimony is essential to our national and economic security, with applications in defense, energy storage, and electronics. Roundtable discussions reinforced the critical role antimony production from Estelle will have in 2
supporting U.S. critical minerals security.”
3
Figure 1. U.S. Secretary of Energy Chris Wright (left) and Nova Minerals’ CEO Christopher Gerteisen (right) About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a U.S. domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in 2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.
Forward Looking Statements 4
This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will,” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forwardlooking statements are based on assumptions as to future events that may not prove to be accurate. Forwardlooking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law.
NEWS RELEASE
Nova Minerals Achieves Key Milestone on Path to Antimony Production 2026-08-27 Anchorage, Alaska, Aug. 27, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to report that the Company has achieved a signi cant milestone in its e orts to establish a fully secure, vertically integrated antimony supply chain in Alaska, with the shipment of key processing and re ning equipment to its Port MacKenzie plant site.
Highlights Over the past six months, a major procurement and logistics operation has been underway to deliver a complete processing and re ning plant facility to Alaska. Almost 500 tons of crushing, ore sorting, milling, otation, and re ning equipment, comprising over 40 shipping containers and multiple oversized loads, is currently en route to Nova Minerals’ antimony processing site at Port MacKenzie, Alaska. The barge containing the equipment departed Seattle yesterday and is expected to arrive on site early September, enabling construction of the antimony processing facilities to commence. The acquisition of a modern, recently decommissioned plant has delivered a signi cant cost saving while accelerating the pathway to initial antimony production, with rst antimony production targeted for 2027. 1
The antimony development is fully funded by Nova's US$43.4 million Defense Production Act Title III award. Nova is a rst mover in developing a fully integrated antimony mining, processing, and re ning operation in Alaska to provide a secure and reliable domestic supply of a critical mineral essential to U.S. national and economic security.
Key Antimony Processing and Re ning Equipment En Route to Port MacKenzie, Alaska Almost 500 tons of crushing, ore sorting, milling, otation, and re ning equipment departed Seattle on August 26, 2026, aboard a barge bound for Nova Minerals’ processing site at Port MacKenzie, Alaska. The shipment, comprising over 40 containers and multiple oversized loads, is expected to arrive by early September, marking the culmination of six months of detailed planning, procurement and logistics coordination. The Company acquired a recently decommissioned modern processing facility in North America, and other processing equipment from across North America. Following consolidation in Seattle, the equipment is now being transported by sea to Port MacKenzie. By acquiring and repurposing the modern processing and milling equipment rather than designing and fabricating a new facility from scratch, Nova will achieve meaningful cost savings and signi cantly accelerate the pathway to construction and initial antimony production. The Port MacKenzie plant is designed to process stibnite-bearing material, initially into antimony trisul de as part of the U.S. Department of War (DoW) project, and is modular and easily scalable for future expansion into additional saleable re ned antimony products, including antimony metal and trioxide. Poer MacKenzie provides a strategic location with access to deepwater port infrastructure, the proposed West Susitna Access Road and Port MacKenzie rail spur. Upon completion, of the DoW funded project, the Nova MInerals Port MacKenzie antimony re nery is expected to serve as a strategic U.S. processing and toll-treatment facility capable of producing re ned antimony products for defense, industrial and critical technology supply chains. The development is fully funded by a US$43.4 million U.S. Department of War award supporting the establishment of a domestic antimony supply chain, with production targeted for 2027.
Nova Minerals CEO, Mr Christopher Gerteisen, commented: “The shipment of this equipment marks an important milestone as Nova advances from exploration and development toward antimony production at Estelle. “A key part of our strategy has been to acquire existing, modern processing equipment and mobilize it to Alaska, 2
rather than build new equipment from scratch. That decision allowed us to move faster and more cost-e ectively as we construct our processing plant at Port MacKenzie and work toward rst antimony production in 2027. “Antimony is a critical mineral essential to our national and economic security, with applications in defense, energy storage, and electronics. We are proud to be advancing a domestic supply chain that will help strengthen U.S. critical minerals security.”
3
Figure 1. Barge with over 40 containers and numerous other oversized loads being loaded in Seattle
4
Figure 2. Tug pushing barge to open water
5
Figure 3. Barge in open water setting sail for Port MacKenzie, Alaska
6
Figure 4. Nova’s planned vertically integrated antimony project in Alaska About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a U.S. domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in 2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.
Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, 7
and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will,” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forwardlooking statements are based on assumptions as to future events that may not prove to be accurate. Forwardlooking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law.
NEWS RELEASE
Western Caucus Congressional Delegation Visits the Estelle Gold and Critical Minerals Project 2026-08-25 Anchorage, Alaska, Aug. 25, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to report that its Alaska Range Resources subsidiary hosted a Congressional delegation brought by the Western Caucus Foundation to see the Company's Estelle Gold and Critical Minerals Project ("Estelle" or the "Project") in Alaska's West Susitna Mineral District on August 24, 2026.
Highlights The visit re ects continued federal interest in Estelle, which combines one of the world's largest undeveloped gold deposits with a rapidly advancing U.S. antimony supply chain initiative. The Congressional delegation included sta
members of Alaska's Senators and Representative and the
Congressional committees overseeing the Department of Energy and other Cabinet Agencies called by President Trump to invest in Alaska's critical mineral resources. The visiting delegation included: Celeste Maloy (Representative for Utah’s 2nd District, Chair of the Congressional Western Caucus, Vice Chair of House Appropriates Subcommittee on Interior Environment, and Related Agencies, member of Appropriations Subcommittee on Energy and Water Development and Related Agencies, and member of the House Committee on Natural Resources) 1
Brian Babin (Representative for Texas’ 36th District, Chair of the House Committee on Science, Space, and Technology, member of the House on Transportation and Infrastructure, Subcommittee on Water Resources and Environment ) Je Hurd (Representative for Colorado’s 3rd District, member of the House Committee on Natural Resources, Chairman of the Subcommittee on Indian and Insular A airs, member of the Transportation and Infrastructure Committee, and member of the Science, Space, and Technology Committee) Pete Stauber (Representative for Minnesota’s 8th District, Chair of the Energy & Mineral Resources Subcommittee of the Committee on Natural Resources, member of the House Committee on Transportation and Infrastructure, member of the House Committee on Small Business, Subcommittee on Rural Development, Energy and Supply Chains) Joseph Cavatoni (Head of U.S. Public Policy at the World Gold Council) The visitors saw rst-hand the developments funded by the Department of War’s US$43.4 million Defense Production Act Title III award to accelerate a fully secure, vertically integrated U.S. domestic supply chain for antimony in Alaska. The Estelle antimony deposits and pilot scale antimony processing facility at Port MacKenzie, both funded by the award, remain on track for rst antimony production in 2027. The visit began with an aerial overview of key infrastructure and project locations, including the site of Nova’s pilot scale antimony processing facility and Port Mackenzie (the planned downstream commercial-size antimony re nery site) and the proposed transportation infrastructure, including the West Susitna Access Road alignment, connecting the mining project, Port Mackenzie, and the Skwentna community. The delegation also viewed signi cant regional energy infrastructure, including the Cook Inlet gas eld, the power station at Beluga, and the proposed Donlin Gold gas and Alaska LNG pipeline routes, all of which provide energy options for Alaskan development like Nova’s project. At Estelle, the delegation received an overview of the Company's development projects before taking a helicopter tour of the Project area. The tour included an aerial view of drilling activities at the Stibium antimony prospect, before continuing across the broader project area, including a visit to the high-grade Styx antimony prospect, and the high-grade RPM gold deposit. The visit highlights growing federal interest in projects that can strengthen U.S. resource security. Estelle hosts one of the world's largest undeveloped gold deposits and is critical in helping the United States advance towards a secure, domestic antimony supply chain. The visit follows a series of President Trump’s Executive Orders aimed at securing America’s defense supply chains, particularly for critical minerals, and opening Alaska’s vast energy and 2
mineral resources. The work of the administration and Congress has reinforced the strategic importance of integrated U.S.-based critical minerals projects such as Estelle.
Nova CEO, Mr Christopher Gerteisen, commented: “Hosting members of the U.S. House and Senate, particularly Alaska’s Congressional delegation and the Western Caucus, at Estelle provided an opportunity to demonstrate both the scale of the Project and the progress made to advance its development As we move toward antimony production in 2027 and continued advancement of the Estelle gold project, we appreciate the ongoing engagement of policymakers who recognize the importance of strengthening America's resource and manufacturing base.”
3
Figure 1. Includes Shawn Rusterholz, Deputy Chief of Sta for Rep. Pete Stauber, Hans Ho man, Nova Minerals General Manager, Joseph Cavatoni, Head of U.S. Public Policy at the World Gold Council, Christopher Gerteisen, Nova Minerals CEO, Celeste Maloy, (R-UT), and Pete Stauber (R-MN) at the Whiskey Bravo camp site
4
Figure 2. Left to right. Brian Babin, (R-TX), Christopher Gerteisen Nova Minerals CEO, and Je Hurd, (R-CO), standing beside two massive stibnite boulders
About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a U.S. domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in 2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.
Forward Looking Statements 5
This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will,” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forwardlooking statements are based on assumptions as to future events that may not prove to be accurate. Forwardlooking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law.
NEWS RELEASE
Nova Minerals Provides an Update on Its 2026 Field Season Activities 2026-08-12 Anchorage, Alaska, Aug. 12, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to provide an update on its 2026 eld season activities at its Estelle Gold and Critical Minerals Project (“Estelle” or the “Project”) in Alaska.
Highlights Three Drill Rigs Currently Operating: The Company currently has three diamond drill rigs operating onsite, conducting drilling 24 hours a day, seven days a week throughout the Alaskan summer. Bulk Sampling and Drilling at the Styx Prospect: Two diamond drill holes have now been completed from a newly constructed drill pad on the eastern side of Styx to test the down-dip extent of the 1 m-thick quartzstibnite vein. In parallel, more than 50 tons of stibnite-rich material has been transported to camp for processing through the Whiskey Bravo ore sorter. This ore sorted coarse concentrate will provide initial feed material for the Port MacKenzie antimony pilot plant. RPM Drilling Ongoing: Several drill pads have been established along the ridgeline and in the eastern valley to test more than 3 km of strike at RPM. Drilling conducted at RPM so far this year has resulted in several newly discovered mineralized instrusives, and we eagerly await the assay results from these holes. Furthermore, at RPM Valley, several pads have been established to support in ll and expansion of the existing resource. Stibium Drilling Ongoing: Due to di cult drilling conditions encountered from the top of the ridge, a new pad 1
was established on the south face of Stibium lower down on the slope and 200m closer to the target zone. Drilling is ongoing. Further Train Drilling Completed: Two additional exploratory drill holes have been completed from a newly established pad at Train to test the depth and extent of outcropping mineralized quartz-arsenopyritechalcopyrite veining. Previous surface sampling returned high-grade gold assays of up to 128 g/t Au, providing a strong target for follow-up drilling. Permitting Progress: A detailed plan of operations for the antimony project has been submitted to the Alaska Dept of Natural Resources for nal review and approval. Civil, wetlands and cultural resource surveys have also been completed along the Korbel and RPM trails, supporting the permitting process for approximately 30 miles of additional access trails. Antimony Trisul de Production: Military-grade antimony trisul de and antimony metal have been successfully produced at laboratory scale using a proprietary hydrometallurgical processing method. Samples have been submitted for independent analysis. Infrastructure Work Ongoing: Gravel quarrying activities are continuing, supported by the new machinery mobilized to site via the snow road this season. Construction of the Stibium trail has progressed to mile 6 and the rst half mile of road sub-base has been laid, while the runway extension is also well underway. Plant Equipment Nearing Delivery: Over 40 containers of process equipment are in transit and being consolidated in Seattle ahead of a scheduled late-August barge shipment to Port MacKenzie, Alaska. Plant construction is expected to commence in 2026. Geologic Reconnaissance Ongoing: Geologic mapping and sampling have been ongoing with a detailed focus at RPM and Train. Property scale sampling is underway to provide more coverage over the ~200 sq mile Estelle Gold and Critical Minerals Project claim block. Geophysics: A ZTEM (Z-Axis Tipper Electromagnetic) survey has been own across the entire claim block. The data is currently under evaluation and will help re ne targeting for drilling and reconnaissance, with the potential to unlock further discoveries. Board and Management Site Visits: Independent Directors Avi Gellar and Dovi Berger visited the Estelle Project site late last month. Independent Chairman Richard Beazley, Executive Director Craig Bentley and Nova CFO Ashlie Thorburn are currently in Alaska visiting the site and meeting with State and other government o cials.
Nova CEO, Mr Christopher Gerteisen, commented: “This eld season is the clearest evidence yet that Estelle is moving from exploration into execution. With three rigs running around the clock, permitting advancing across our mine plans and processing facilities, and mill equipment already in transit, every workstream is converging toward Estelle' rst antimony production. 2
“We are converting years of exploration success into a near-term, funded path to production for antimony while also progressing Estelle’s Gold Project, one of the world’s largest undeveloped gold resources. “Having successfully produced military-grade antimony trisul de and antimony metal at laboratory scale, we are taking tangible steps toward securing a domestic supply of antimony for the United States, positioning Nova at the centre of America’s critical minerals strategy.”
3
Figure 1. Estelle property map with 2026 eld season progress highlighted
4
Figure 2. Stibium drilling
5
Figure 3. Gravel quarrying for the Stibium trail, airstrip expansion and ore sorter site
6
Figure 4. RPM ridge drilling
7
Figure 5. Large Caribou class aircraft landing at the Whiskey Bravo airstrip
8
Figure 6. New pad being built at the bottom of the ridge at RPM
9
Figure 7. Nova CEO, Christopher Gerteisen, and Independent Chairman, Richard Beazley examining some of the stibnite rich material brought down from the Styx prospect
About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a US domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold 10
Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in 2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.
Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will,” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forwardlooking statements are based on assumptions as to future events that may not prove to be accurate. Forwardlooking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law.
NEWS RELEASE
Nova Minerals Highlights Strategic Alignment with U.S. Defense Supply Chain Priorities Under White House Executive Order 2026-07-24 Anchorage, Alaska, July 24, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA), a rst mover currently developing a modern, fully integrated and secure U.S. domestic antimony supply chain spanning mining through to re ning in Alaska, welcomes the Executive Order, ‘Securing America's Defense Supply Chains and Ensuring Domestic Acquisition of Critical Materials’ (Executive Order), signed by U.S. President Donald J. Trump on July 20, 2026. The Company believes the Executive Order represents a signi cant policy milestone supporting the development of U.S. domestic critical minerals capacity and highlights the strategic relevance of its integrated antimony project. The United States remains heavily reliant on imports for many critical minerals, including antimony, which is essential to the nation's economic resilience and defence capabilities. The Executive Order reinforces the U.S. Government's commitment to resilient domestic and allied critical mineral supply chains for defence by establishing a policy that military equipment and the critical materials required to manufacture, maintain and sustain it should be sourced from the United States or trusted allied nations. The Executive Order also mandates end-to-end supply chain traceability, including veri cation of raw material origin and assessment of foreign ownership and supply risks, while restricting materials sourced from entities linked to designated foreign adversaries. These measures will require defense contractors to rapidly qualify alternative U.S. domestic and allied suppliers, increasing demand for secure, compliant sources of critical minerals.
1
A Fully Secure Integrated U.S. Antimony Supply Chain Nova Minerals is already building the kind of secure fully integrated U.S. domestic critical minerals supply chain the Executive Order is designed to encourage, with rst antimony production from its pilot plant targeted for 2027. In October 2025, the Company was awarded a US$43.4 million Defense Production Act Title III award by the U.S. Department of War to support the development of an antimony mine at its Estelle Gold and Critical Minerals Project, and a downstream re nery at Port MacKenzie, both located in Alaska. Engineering and design for the Port MacKenzie pilot plant facility have been completed, with the scalable processing hub designed to treat concentrate from Estelle as well as potential third-party domestic and allied feedstocks. Process plant equipment procurement is underway, with key components delivered or in transit and construction expected to commence in the coming months. Upon completion, Port MacKenzie is expected to provide a strategic U.S. processing and toll-treatment capability, providing defense contractors with access to compliant military-grade antimony products and supporting a more secure and resilient U.S. domestic and allied supply chain. To view a 3D rendering video of the proposed Port MacKenzie antimony pilot plant click here.
Nova Minerals CEO, Mr. Christopher Gerteisen, commented: “This Executive Order re ects the direction of U.S. policy on critical minerals sourcing that has informed our work at the Estelle Gold and Critical Minerals Project and our planned processing infrastructure at Port MacKenzie. It aligns directly with our vision to develop responsible, world-class mining and re ning operations that contribute to U.S. resource security and national defense priorities. With the support of the U.S. Department of War, we remain focused on delivering a U.S. domestic antimony supply chain, targeting production in 2027.”
About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a US domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in 2027. 2
Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.
Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” "will” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forwardlooking statements are based on assumptions as to future events that may not prove to be accurate. Forwardlooking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law.
Investor Relations: Dave Gentry, CEO RedChip Companies, Inc. Phone: 1-407-644-4256 Email: [email protected]
Nova Minerals Craig Bentley Director Phone: 1-720-550-4223 Email: [email protected]
Source: Nova Minerals Corp. 3
NEWS RELEASE
Nova Minerals Announces it has Completed the Engineering and Design of its Antimony Pilot Plant 2026-07-13 Anchorage, Alaska, July 13, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to announce the completion of the engineering and design for its Estelle antimony pilot processing plant in Alaska.
Highlights Fully Funded Pilot Plant: Engineering and design covers the Whiskey Bravo front-end processing site, Port MacKenzie bene ciation plant, Port MacKenzie re nery (Figure 1) and supporting infrastructure. Antimony Trisul de Production: Engineered to meet U.S. Department of War military-grade quality speci cations using a proprietary cleaner hydrometallurgical processing method. Building a Secure American Fully Integrated Antimony Supply Chain: The pilot plant is a critical rst step in fast-tracking domestic antimony production in Alaska. With a modular design that enables future expansion through the addition of re ning circuits, including antimony trioxide and antimony metal production, the facility will serve as a scalable processing hub for feedstock from Estelle, as well as regional and global projects. Construction Expected to Commence this Quarter: Process plant equipment procurement underway with key components now delivered or in transit to the project site to support construction in the coming months 1
(Figures 3 to 6). Click here to view a 3D rendering video of the proposed Port MacKenzie pilot plant
2
Figure 1. 3D rendering of the proposed Port Mackenzie antimony pilot plant Nova Minerals CEO, Mr. Christopher Gerteisen, commented: “We continue to make rapid progress on the antimony project and remain ahead of schedule, with another major milestone now completed. The engineering and design plan has been developed based on extensive metallurgical test work and process owsheet development. With this work complete, and procurement of key equipment now nalized, the project has entered the execution phase. Ore extraction and construction of the process plant are next steps as we continue progressing toward near-term antimony production.”
Integrated Pilot Plant Flowsheet The Estelle antimony processing pilot plant has been designed to treat stibnite-bearing material and produce an 3
antimony trisul de product suitable for sale or further downstream use. The project is structured around two principal locations: Whiskey Bravo Site – front-end processing, including crushing, screening, ore sorting, concentrate storage and load-out. Port MacKenzie Processing Facility – crushing, screening, ore sorting, bene ciation, re ning, product recovery, utilities, reagent systems, infrastructure and logistics (Figure 1). After collecting bulk sample material from two locations (Stibium and Styx) within the Estelle Project claims, the material will be transported to Whiskey Bravo for crushing and initial sorting. Select sample material will then be transported via air or snow road to Port MacKenzie for further processing. Processing at Port MacKenzie will include concentration and re ning of the antimony ore using a proprietary cleaner hydrometallurgical processing method to make the nal antimony trisul de product. The re ned antimony product will then be ltered, dried, and bagged for shipment.
4
Figure 2. Estelle antimony pilot plant process block ow diagram Work Underway With engineering and design complete, Nova has advanced to procurement and construction readiness, with major equipment packages progressing and over 40 containers currently on route to Port Mackenzie for delivery in the coming weeks. The project has capitalized on a unique opportunity to acquire key equipment from a recently decommissioned, modern bene ciation circuit with a limited operating history from a North American processing facility. The equipment is well suited to the proposed antimony pilot plant owsheet and is expected to reduce procurement lead times, improve capital e ciency, and accelerate the transition from engineering to construction and operational readiness. Major equipment items procured include: Crushers Ball mill (Figure 3) Ore sorters (Figure 4) Screens (Figure 6) Flotation cells (Figure 5)
5
Conveyors
6
Figure 3. Port MacKenzie ball mill
7
Figure 4. Whiskey Bravo and Port MacKenzie Steinert ore sorter
8
Figure 5. Port MacKenzie otation cells
9
Figure 6. Whiskey Bravo Sandvik QA440 double screen Quali ed Persons The information contained in this announcement, relating to metallurgical results, is based on, and fairly and accurately represent the information and supporting documentation prepared by Mr Damian Connelly. Mr Connelly is a full-time employee of METS Engineering who are a contractor to Nova Minerals, and a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Connelly has su cient experience which is relevant to the style of mineralization and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person as de ned in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Exploration Targets, Mineral Resources and Ore Reserves and as a Quali ed Person as de ned in Regulation S-K 1300 under the Securities Act of 1933, as amended (S-K 1300). Mr Connelly consents to the inclusion in the announcement of the matters based on the results in the form and context in which they appear. 10
About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a US domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in late 2026/2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.
Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” "will” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forwardlooking statements are based on assumptions as to future events that may not prove to be accurate. Forwardlooking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law.
Investor Relations: Dave Gentry, CEO RedChip Companies, Inc. Phone: 1-407-644-4256 Email: [email protected]
Nova Minerals Craig Bentley Director Phone: 1-720-550-4223 Email: [email protected]
11
NEWS RELEASE
Nova Minerals Appoints Former JP Morgan Metals & Mining Professional to Board as Company Advances U.S. Critical Metals Strategy 2026-07-01 Anchorage, Alaska, July 01, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) is pleased to announce the appointment of Mr. Joshua Girnun to the Company’s Board of Directors, e ective July 1, 2026. Mr. Girnun brings institutional nance and risk underwriting experience from his background at JP Morgan Chase & Co., where he co-founded a client-facing risk underwriting team covering the metals and mining, energy, renewables, industrials, oil and gas, and agriculture sectors. He pairs his nancial background with strong technical training, holding two master’s degrees spanning resource nance and geosciences, in addition to an honours degree and a bachelor’s in geology. The appointment of Mr. Girnun comes as Nova enters into what it believes to be a pivotal period of execution. The Company recently completed its redomiciliation from Australia to the United States, a move designed to align its corporate structure with its predominantly U.S. asset base, deepen access to American government and institutional capital, and position the Company for broader index inclusion. Concurrently, Nova is progressing its Estelle Gold and Critical Minerals Project through feasibility, evaluating new project opportunities, and preparing for near-term production of military-grade antimony trisul de, supported by a US$43.4 million award from the U.S. Department of War under the Defense Production Act. The Company believes that Mr. Girnun’s institutional nance experience and technical resource background will provide meaningful support to the Company as it advances these projects.
1
At JP Morgan, Mr. Girnun co-founded a subject matter expert team that provided independent, cross-sector assessments and due diligence covering corporate lending, project nance, trade nance and capital markets transactions for large mining and energy clients. He also helped develop the rm’s internal risk standard for the natural resources sector. Earlier in his career, he held a range of technical and resource evaluation roles spanning eld and desktop geology, project valuation and nancial modelling to advance green eld and brown eld resource projects, including across Sub-Saharan Africa. Mr. Girnun holds a Master of Science in Metals and Energy Finance from Imperial College London, a Master of Science in Geosciences from the Hebrew University of Jerusalem, and a Graduate Honours and Bachelor of Science in Geology from the University of the Witwatersrand. His research has been published in the Journal of Structural Geology.
Nova Minerals CEO Christopher Gerteisen commented: “We believe that Josh’s experience in evaluating resource transactions at the highest level of institutional nance will be helpful as the Company executes on its continuing strategy to develop our properties, and his decision to join our Board re ects a level of conviction in this Company’s assets and trajectory. As Nova moves from development into production, the perspective Josh will bring across technical geology, project economics and institutional nance is exactly what this next phase demands. His insight will be particularly valuable now that we have completed our redomiciliation, as the Board oversees the advancement of Estelle through feasibility and our antimony assets toward production under the Department of War program.”
Mr. Girnun commented: “The Estelle Project is one of the most signi cant undeveloped gold and critical minerals assets in North America, sitting in a proven belt with a 220 million ounce gold endowment and backed by a US$43.4 million Department of War commitment on the antimony side. With strong U.S. government backing on the antimony side and a substantial gold resource in a proven belt, I believe Nova is well positioned as it advances toward production, and I look forward to helping the Board execute on its vision and strategies.”
About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a US domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) 2
documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in late 2026/2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.
Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements include the Company's statements with respect to Mr. Girnun's expected contributions to the Board of Directors and other statements related to the Company’s operations and strategies. Forward-looking statements are based on the Company’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Factors that could cause actual results to di er from current expectations include those factors, and the other risks and uncertainties described in our public lings made from time to time with the SEC, the ASX or otherwise. Further, certain forward-looking statements are based on assumptions as to future events that may not prove to be accurate. Forward-looking statements contained in this announcement are made as of this date, and the Company undertakes no duty to update such information except as required under applicable law. Investor Relations: Dave Gentry, CEO RedChip Companies, Inc. Phone: 1-407-644-4256 Email: [email protected] Nova Minerals: Craig Bentley Director E: [email protected]
3
M: +61 414 714 196
Source: Nova Minerals Corp.
4
NEWS RELEASE
Clari cation Regarding Market Capitalization Following U.S. Redomiciliation 2026-06-30 Anchorage, Alaska, June 30, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) has become aware that certain publicly available investment websites have incorrectly reported the Company's market capitalization as approximately US$2.1 billion following the completion of its redomiciliation to the United States, as disclosed in the Company's Current Report on Form 8-K led on June 16, 2026 (the "Redom 8-K"). The Company advises that these reported market capitalization
gures are inaccurate. Following the
redomiciliation, the Company's issued and outstanding common stock consisted solely of the shares of common stock issued in exchange for the outstanding ordinary shares of Nova Minerals Limited as of June 16, 2026, in accordance with the 1-for-12 exchange ratio disclosed in the Redom 8-K. As of June 16, 2026, Nova Minerals Limited had 458,140,036 ordinary shares outstanding. Applying the 1-for-12 exchange ratio described in the Redom 8-K, the Company issued an aggregate of 38,181,050 shares of common stock, including a limited number of additional shares issued as a result of rounding in accordance with the terms of the exchange. Based on the Company's current trading price, its market capitalization is approximately US$166 million. The Company is not responsible for market capitalization gures published by third-party websites and encourages investors to refer to the Company's lings with the U.S. Securities and Exchange Commission when evaluating the 1
Company's capital structure and other publicly disclosed information.
About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a US domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in late 2026/2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.
Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” "will” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forwardlooking statements are based on assumptions as to future events that may not prove to be accurate. Forwardlooking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law. Investor Relations: Dave Gentry, CEO RedChip Companies, Inc. Phone: 1-407-644-4256 2
Email: [email protected] Nova Minerals: Craig Bentley Director E: [email protected] M: +61 414 714 196
Source: Nova Minerals Corp.
3
Source: Nova Minerals Corp. June 29, 2026 06:30 ET
Nova Minerals Announces Korbel Floatation Test-work Produces HighGrade Gold Concentrate up to 26.7 g/t Au with Consistent Recoveries Exceeding 95% Anchorage, Alaska, June 29, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to report results from bench-scale rougher flotation testing on low-grade Korbel ore, undertaken within a broader Feasibility Study (FS) level metallurgical test-work program. Flotation of low-grade Korbel ore at a coarser-than-conventional grind size has the potential to materially reduce both capital and operating costs while maintaining strong gold recovery. Highlights
95% Gold Recovery: Low-grade Korbel ore (0.39–0.42 g/t Au) delivered a strong flotation response at 250 µm or finer, producing a low-mass pull of only 2-3% (meaning a 97-98% reduction in the volume going to downstream processing), and a high-grade concentrate of 14.7–26.7 g/t Au (Table 1). Significant Potential FS Value Upside: Application of coarse particle flotation to the bulk tonnage S-K 1300 compliant pit constrained 425 Mt @ 0.3 g/t Au (4.05 Moz Au) Korbel resource (Table 4) is expected to enhance Estelle’s FS outcomes by upgrading low-grade ore, reducing processing intensity, lowering energy use, improving gold recovery, and simplifying the flowsheet (Figure 2) by potentially eliminating ore sorting and heap leach requirements and allowing a significantly smaller Carbon-in-Leach (CIL) plant. Ongoing PFS Optimization: Korbel CIL test-work and further coarse particle flotation studies are underway to refine the flowsheet, confirm high gold recovery and gangue rejection, and optimize plant design, scale, configuration, and overall project economics. Nova Minerals CEO, Mr. Christopher Gerteisen, commented: “As part of our ongoing Feasibility Study optimization work, these results represent a major breakthrough in our metallurgical test program. The demonstration that Korbel ore is highly amenable to coarse particle flotation, producing a very high-grade concentrate representing only 2-3% of the total mass while achieving gold recoveries in excess of 90%, has the potential to be a game changer for the project. The successful application of coarse particle HydroFloat technology to our process flowsheet has the potential to deliver substantial reductions in processing and capital costs, while simplifying downstream operations. These improvements could significantly enhance the project's overall economics and increase our ability to profitably recover gold from lowergrade material across the bulk-tonnage Korbel deposit. Metallurgical test work is continuing to evaluate even coarser particle sizes, which could further improve the project's processing cost profile and strengthen our strategy of maximizing gold production and resource conversion over the life of the mine.”
Korbel Flotation Metallurgical Test-work The test-work was undertaken on a composite sample generated from diamond drill core from the Korbel Main deposit, representing predominantly fresh sulfide intrusive-hosted ore from an intrusion-related gold system. The sample material was selected from drill holes KBDH-005, KBDH-011 and KBDH-025 over the intervals summarized in Table 2, with the results outlined in Table 1. Table 1. Bench rougher floatation test-work results
Test ID BF2939 BF2940 BF2941 BF2942 BF2943 BF2944 BF2945 BF2946
Grind Size µm 150 150 75 250 500 1000 75 75
Mass Pull %
Au Recovery %
2.05 3.18 2.79 2.67 2.82 3.00 2.56 3.06
Au Grade g/t
94.9 96.1 97.7 95.9 83.6 41.6 97.9 98.3
S-2 Recovery %
26.7 15.1 14.7 17.2 15.8 5.3 17.6 18.7
91.2 90.6 90.7 90.3 89.5 75.0 90.5 90.4
As Recovery % 97.0 96.7 96.6 96.6 87.6 69.6 96.6 96.5
Table 2. Korbel drill samples used for test-work composite
Hole ID KBDH-005 KBDH-005 KBDH-011 KBDH-025
Sample ID A0393009 B709084 A0393488 A0394774
Sample ID A0393118 B709108 A0393677 A0394902
From m
26 307 6 258
To m 307 309 499 593
From ft
87 1009 22 847
From ft 1009 1017 1638 1948
Table 3. Korbel drill hole locations
Hole ID
Easting
Northing
KBDH-005 KBDH-011 KBDH-025
505300.5 505288.1 505276.9
6874852.9 6874848.4 6874846.8
Elev (m) 977.5 977.3 978.8
EOH (m) 456.3 499.3 593.8
Azi Dip
Zone
90 -45 45 -70 135 -45
Korbel Core Korbel Core Korbel Core
Assay Results ASX: 19/8/2020 ASX: 19/8/2020 ASX: 26/11/2020
Figure 1 presents the Korbel flotation response across a range of grind sizes, as determined from the metallurgical test-work program, together with the indicative operating windows for available flotation technologies.
Figure 1. Korbel floatation grind sensitivity test-work results Korbel Coarse Particle Floatation Flowsheet The proposed flowsheet (Figure 2) demonstrates the potential to fully utilize the Korbel resource by integrating coarse particle flotation for early upgrading with downstream CIL treatment for gold recovery.
Figure 2. High-level conceptual flowsheet for Korbel ore Table 4. S-K 1300 compliant pit constrained mineral resource estimate – January 2024
Deposit
Cutoff
Measured
Indicated
Inferred
Total
RPM North RPM South Total RPM Korbel Main Cathedral Total Korbel Total Estelle
Tonnes Grade Moz Tonnes Grade Moz Tonnes Grade Moz Tonnes Grade Moz Mt g/t Au Au Mt g/t Au Au Mt g/t Au Au Mt g/t Au Au 0.2 1 4.1 0.18 3 1.6 0.15 23 0.6 0.45 28 0.9 0.78 0.2 23 0.5 0.35 23 0.5 0.35 1 4.1 0.18 3 1.6 0.15 46 0.5 0.8 51 0.7 1.13 0.15 240 0.3 2.39 35 0.3 0.3 275 0.3 2.7 0.15 150 0.3 1.35 150 0.3 1.35 240 0.3 2.39 185 0.3 1.65 425 0.3 4.05 1 4.1 0.18 243 0.3 2.54 231 0.3 2.45 476 0.3 5.17
S-K 1300 compliant pit-constrained resource at a US$2,000 oz gold price as per the S-K 1300 Initial Assessment Technical Report Summary on the Estelle Gold Project, Alaska, USA, with an effective date of January 31, 2024. 5.2 Moz refers to the measured, indicated, and inferred resources on 100% basis, 85% attributable to Nova Minerals (4.4 Moz). Qualified Persons The information contained in this announcement, relating to metallurgical results, is based on, and fairly and accurately represent the information and supporting documentation prepared by Mr Damian Connelly. Mr Connelly is a full-time employee of METS Engineering who are a contractor to Nova Minerals, and a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Connelly has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Exploration Targets, Mineral Resources and Ore Reserves and as a Qualified Person as defined in Regulation S-K 1300 under the Securities Act of 1933, as amended (S-K 1300). Mr Connelly consents to the inclusion in the announcement of the matters based on the results in the form and context in which they appear. About Nova Minerals Corp Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a US domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two defined multi-million-ounce gold resources, and more than 20 prospects distributed along a 35-kilometre mineralized trend, in the prolific Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in late 2026/2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com. Forward Looking Statements This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identified by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” "will” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Corp’s current expectations and are subject to inherent uncertainties, risks and assumptions that are difficult to predict. Further, certain forward-looking statements are based on assumptions as to future events that may not prove to be accurate. Forward-looking statements contained in this announcement are made as of this date, and Nova Minerals Corp undertakes no duty to update such information except as required under applicable law.
Investor Relations: Dave Gentry, CEO RedChip Companies, Inc. Phone: 1-407-644-4256 Email: [email protected]
Anchorage, Alaska, June 22, 2026 - Nova Minerals Corp (“Nova Minerals” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to announce that its redomicile to the United States has been successfully completed and to provide an update on its 2026 field season, with exploration and development activities now well underway.
Highlights
● Successfully completed redomicile to the United States: The Company’s common stock and listed warrants are now trading on the NYSE American under the ticker symbols “NVA” and “NVAWS”, respectively. Chess Depositary Interests (CDIs) are also trading on the ASX under the ticker symbol “NVA”.
● Antimony drilling commenced: Drilling at the Stibium antimony-gold prospect commenced in early June from the existing ridge-top drill pad, targeting stibnite-bearing veins identified at surface (Figure 3).
● Gold drilling commenced: Drilling commenced on 17 June from a new pad at the northern end of the main RPM ridge, targeting gold geochemical anomalies (Figure 1). The 2026 RPM program will continue testing new zones along the two-mile-long ridge while further advancing resource definition at the RPM North and RPM Valley deposits.
NEWS RELEASE
Nova Commences Fully Funded 2026 Estelle Exploration and Project Development Programs 2026-05-28
Anchorage Alaska, May 28, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Limited (“Nova” or the “Company”) (NASDAQ: NVA) (ASX: NVA) (FRA: QM3) ) is pleased to provide an update on its planned 2026 eld season and antimony development activities, as the Company advances its agship Estelle Gold and Critical Minerals Project toward the Feasibility Study (FS) stage. Pilot-scale antimony production remains on schedule for late 2026 to early 2027, with military-grade antimony trisul de samples now nearing completion.
Highlights Team mobilized for one of the largest eld and development programs to date, focused on resource de nition drilling at the RPM deposit to advance the Feasibility Study (FS), progressing the Stibium and Styx antimony prospects towards antimony production and resource delineation, and streamlining permitting activities. 2026 programs are fully funded, with over US$60 million available through cash and Department of War (DoW) award funding, providing optionality to accelerate activities as required. Extensive drilling program up to 10,000 meters focused on high-priority in ll and expansion targets at RPM, alongside advancement of antimony prospects, to commence in the coming weeks. The Company’s rst lab-scale antimony metal and military-grade antimony trisul de samples derived from 1
Estelle ore are in the nal stages of preparation with assay results expected shortly. Critical mining and processing equipment delivered to site, with procurement of the Port Mackenzie downstream antimony process and re nery equipment advancing with delivery expected in the coming months. Project optimization and Pre-Feasibility studies are advancing in parallel with expanded environmental and geoscience programs supporting future permitting and regulatory assessments. Extensive multi-element surface exploration program planned across the Estelle Project, comprising reconnaissance and prospect scale sampling, excavation of outcropping Stibnite (antimony) ore vein material, detailed mapping of key target areas including RPM, West Wing, and Stibium, and soil grid surveys across numerous targets.
Nova CEO, Mr Christopher Gerteisen, commented: “We are excited to commence the 2026 eld season, which is expected to represent a major advancement for the Estelle Gold and Critical Minerals Project. The program includes one of the largest drill campaigns undertaken at Estelle to date, targeting both gold resource expansion and antimony development opportunities. Ongoing drilling and technical work will continue to support resource growth and advancement of the Project’s PFS studies. “Concurrently, the fully funded antimony initiative, supported by a US$43.4 million U.S. Department of War award, positions Nova to advance toward near-term production and establish a vertically integrated domestic antimony supply chain. I can report we have already produced antimony metal and military-grade antimony trisul de at the lab scale from Estelle stibnite ores which is now being assayed and certi ed. As an early mover in the U.S. critical minerals sector, Nova is now entering a key execution phase focused on developing antimony production alongside the continued advancement of its large-scale gold development assets, with the objective of generating long-term shareholder value.”
2026 Estelle Exploration Program Following a record freight delivery of approximately 1.5 million pounds of equipment and supplies over recent months, activity at the Estelle camp has ramped up signi cantly. Helicopters, construction crews, drillers, and geologists are now onsite advancing preparations for the 2026 eld program, with drilling expected to commence in the coming weeks. A drilling program of up to 10,000m is planned for 2026, with up to three diamond core rigs to be deployed across the Estelle Project. The campaign will focus on in ll and expansion drilling at RPM, together with the continuation of 2
the targeted drill program initiated last year at Stibium, focusing on exposed stibnite (antimony) vein systems. The drilling program will be complemented by extensive regional mapping and surface exploration across RPM, West Wing, Stibium and Portage Pass, as well as further bulk sampling of the exposed stibnite veins at Styx. Operations are expected to run for a minimum of three months during the Alaskan summer, leveraging near 24hour daylight for continuous drilling seven days a week. The program and drill targeting will remain exible and may be re ned based on ongoing geological observations and drill core results.
3
Figure 1. Estelle Project map highlighting identi ed gold and antimony prospects, together with targets for the 2026 drilling and exploration program.
RPM Approximately 7,000m of drilling is planned at RPM, with three primary objectives:
- Expand the eastern strike extension at RPM North, where 2025 drilling con rmed broad near-surface gold intersections in holes RPM-068 (167m @ 0.7 g/t Au from 187m, including 75m @ 1.1 g/t Au from 242m) and RPM070 (165m @ 0.6 g/t Au from 3m)[1].
- Increase the Measured and Indicated resource con dence at RPM Valley through additional in ll drilling, together with step-out drilling to the south and west.
- Drill test near-deposit expansion targets along the ridgeline north of RPM North, where surface sampling has identi ed the potential for additional high-grade, RPM-style gold mineralization. 4
In addition to the drilling program, detailed mapping is planned north of RPM North, together with further surface reconnaissance work between RPM and the Revelation prospect to follow up on 2025 surface sampling, which returned rock chip assays of up to 24.6 g/t Au west of RPM[2].
Stibium With a diamond drill rig winterized and remaining on the pad from last season, approximately 3,000m of targeted drilling at the Stibium antimony-gold prospect is scheduled to recommence in the coming weeks. In addition to the established drill pad, construction of a new pad on the ank of Stibium is expected to provide more direct access to the target zone with reduced drilling metres, while avoiding the broken ground encountered during previous ridgeline drilling and directly targeting the exposed stibnite (antimony) veins. In addition to the drilling program, detailed structured mapping is to be undertaken across the Stibium prospect in 2026.
Styx Continue extraction of Stibnite (antimony) ore material from the ~1m-wide exposed Styx vein for upgrading at the Whiskey Bravo ore sorting facility prior to transport to the Port Mackenzie plant for downstream antimony processing and re ning. Ore excavation will utilize mining equipment purchased with DoW funding to mechanize the process to open up and provide access to the full sur cial extent of the vein and signi cantly increase mine production rates.
Korbel The majority of the mineral resource at the Korbel deposit already has a high con dence Indicated resource classi cation. Korbel will comprise a signi cant portion of the ore volume in any future mining scenario at the Estelle Project. No further in ll drilling is planned for 2026, however PFS level metallurgical test work, environmental, and other technical studies are ongoing.
West Wing Detailed mapping and additional sampling are planned at the West Wing prospect in 2026 to de ne potential future drilling positions following eld observations and 2025 surface assay results which outlined a gold-copper anomaly measuring approximately 1,500m by 800m, with grades of up to 15.5 g/t Au and 6.9% Cu[3]. 5
Portage Pass A detailed soil sampling grid is planned in 2026 across the Portage Pass valley area, and pending those results could be followed up by an IP geophysical survey using the same exploration approach that led to the Korbel discovery. The program will follow up on the 2025 sampling which identi ed a broad zone of gold mineralization located 2.5km from Korbel, with rock samples grading up to 14.3 g/t Au along the ridgeline above the Portage Creek valley oor[4].
Generative Nova commenced a Z-Axis Tipper Electromagnetic (ZTEM) airborne geophysical survey at the beginning of May covering the entire claim block. ZTEM surveys have proven an e ective exploration tool for discovery of reduced intrusion-related gold systems in addition to copper porphyries. Nova believes this dataset will identify intrusions under cover of the Kahiltna ysch as well as adding detail over areas of the claim block that are inaccessible. An in ll reconnaissance sampling program is also planned across the property in 2026. Reconnaissance sampling has been responsible for identifying the numerous prospects across Estelle, and the 2026 program will be focused on lling existing gaps as well as following up on any anomalies generated from the ZTEM survey.
2026 Development Program In parallel with its ongoing exploration activities, Nova continues to advance a signi cant development program across the Estelle Project as the Company progresses its gold assets toward Pre-Feasibility Study (PFS) completion and its antimony assets toward initial production targeted for late 2026 to early 2027.
Antimony Product Development The Company’s rst lab-scale antimony metal and military-grade antimony trisul de samples derived from Estelle ore are in the nal stages of preparation. Assay results are expected shortly and will represent an important milestone in establishing a domestic U.S. antimony supply chain capability.
Antimony Re nery The antimony processing plant and all associated equipment are currently on order and are expected to be shipped to the Port Mackenzie site in the coming months. Delivery and installation activities are anticipated to commence shortly thereafter as the Company advances toward commissioning of its downstream re ning operations. 6
Site Infrastructure Construction Following the successful delivery of heavy earthmoving and haulage equipment, together with construction materials to site, construction of the Stibium access trail has commenced. Strong progress has already been achieved toward the base of the Stibium antimony prospect. In addition, expansion works for the site airstrip and apron are scheduled to begin shortly to support increasing operational and logistical requirements.
Crushing and Ore Sorting Facility Construction of the onsite crushing and ore sorting facility is now underway, with crushing, screening, and conveying equipment already delivered to site. Ore sorters are expected to arrive in the coming months. The facility is targeted for completion during the 2026 Alaskan summer season and is expected to play a key role in producing concentrate for transport to the Port Mackenzie re ning plant, supporting production of military-grade antimony trisul de under the US$43.4 million Department of War award.
PFS Advancement and Mine Development Nova continues to advance the Estelle Gold Project through integrated PFS-level engineering, metallurgical testing, environmental baseline work, and infrastructure studies aimed at de-risking project development and supporting future permitting activities. Engineering and Technical Studies: Ongoing work is focused on optimizing the overall mine development strategy for the RPM and Korbel deposits, including mine planning, processing design, infrastructure layout, geotechnical investigations, hydrology, and site-wide engineering trade-o
studies. Technical programs
through 2026 are intended to improve con dence in key design parameters, support project scalability, and re ne an integrated development scenario aligned with future construction and operational requirements. Metallurgy and Process Development: Metallurgical and process engineering programs continue to evaluate recovery optimization, owsheet re nement, and processing assumptions to support PFS-level design criteria and improve overall project economics. Environmental and Permitting: Baseline environmental and community studies are progressing to support environmental assessment and permitting requirements. These datasets will provide critical inputs for infrastructure design, water management, reclamation planning, and long-term mine development permitting.
Quali ed Persons 7
Vannu Khounphakdy, Professional Geologist and member of Australian Institute of Geoscientists contracted by Nova Minerals to provide geologic consulting services. Mr. Khounphakdy holds a Master of Science in Mine Geology and Engineering. He is a quali ed person with at least 5 years experience with this type of project. By reason of education, a liation with a professional association, and past relevant work experience, Mr. Khounphakdy ful lls the requirements of Quali ed Person (QP) for the purposes of SEC Regulation SK-1300 for data QA/QC checks relevant to this announcement. Hans Ho man is a State of Alaska Certi ed Professional Geologist contracted by Nova Minerals to provide geologic consulting services. Mr. Ho man is a member of the American Institute of Professional Geologists and holds a Bachelor of Science degree in Geological Engineering with a double major in Geology and Geophysics. He is a quali ed person with at least 5 years of experience with these types of projects. By reason of education, a liation with a professional association, and past relevant work experience, Mr. Ho man ful lls the requirements of Quali ed Person (QP) for the purposes of SEC Regulation SK-1300 for the technical information presented in this announcement. Christopher Gerteisen, Chief Executive O cer of Nova Minerals, is a Professional Geologist and member of Australian Institute of Geoscientists, and has supervised the preparation of this news release and has reviewed and approved the scienti c and technical information contained herein. Mr. Gerteisen is a "quali ed person" for the purposes of SEC Regulation S-K 1300.
About Nova Minerals Limited Nova Minerals Limited is advancing one of the world’s largest undeveloped gold deposits into production and securing a US domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in late 2026/2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website. www.novaminerals.com.au
Forward Looking Statements
8
This press release contains “forward-looking statements” that are subject to substantial risks and uncertainties. All statements, other than statements of historical fact, contained in this press release are forward-looking statements. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” "will” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Limited’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forward-looking statements are based on assumptions as to future events that may not prove to be accurate. These and other risks and uncertainties are described more fully in the section titled “Risk Factors” in the nal prospectus related to the public o ering led with the Securities and Exchange Commission. Forward-looking statements contained in this announcement are made as of this date, and Nova Minerals Limited undertakes no duty to update such information except as required under applicable law. [1] See news release dated January 7, 2026, available on the Company’s website www.novaminerals.com.au, under the Company’s pro le on the ASX, and US Edgar lings on the SEC. [2] See news release dated March 9, 2026, available on the Company’s website www.novaminerals.com.au, under the Company’s pro le on the ASX, and US Edgar lings on the SEC. [3] See news release dated March 2, 2026, available on the Company’s website www.novaminerals.com.au, under the Company’s pro le on the ASX, and US Edgar lings on the SEC. [4] See news release dated April 14, 2026, available on the Company’s website www.novaminerals.com.au, under the Company’s pro le on the ASX, and US Edgar lings on the SEC.
For Additional Information Please Contact Investor Relations: Dave Gentry, CEO RedChip Companies, Inc. Phone: 1-407-644-4256 Email: [email protected] Nova Minerals: Craig Bentley 9
Director of Finance & Compliance & Investor Relations E: [email protected] M: +61 414 714 196
NEWS RELEASE
Nova CEO to present at the 2026 Alaska Sustainable Energy Conference 2026-05-20
Melbourne, Australia, May 20, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Limited (“Nova” or the “Company”) (NASDAQ: NVA) (ASX: NVA) (FRA: QM3) is pleased to advise that Chief Executive O cer, Mr. Christopher Gerteisen, will attend and present at the Alaska Sustainable Energy Conference (ASEC). ASEC is a premier Alaskan energy and resources gathering, bringing together senior government o cials, industry executives, and leading researchers to advance dialogue on energy security, resource development, and sustainable infrastructure across the state and broader region. The conference will be held in Anchorage, Alaska, from 19 - 21 May 2026. Further details on the conference can be found at https://alaskasustainableenergy.com/ Mr. Gerteisen will join a distinguished speaker program that includes, among others: Doug Burgum, Secretary of the U.S. Department of the Interior and Chairman, National Energy Dominance Council Mike Dunleavy, State of Alaska Governor Nancy Dahlstrom, Lieutenant Governor, State of Alaska John Crowther, Commissioner, Alaska Department of Natural Resources Audrey Robertson, Assistant Secretary of Energy, U.S. Department of Energy, O ce of Critical Minerals and Energy Innovation 1
Randy Ruaro, Executive Director, Alaska Industrial Development and Export Authority (AIDEA) Lee Ann Munk, Director, Alaska Critical Minerals Collaborative, University of Alaska Fairbanks ASEC provides a valuable platform for Nova to further strengthen relationships with government, industry, and community leaders as the Company progresses the Alaska-based Estelle Gold and Critical Minerals Project toward production. A copy of Mr. Gerteisen’s presentation can be found at the link below https://novaminerals.com.au/wp-content/uploads/2026/05/Presentation-for-Governors-Critical-MineralsConference.pdf
About Nova Minerals Limited Nova Minerals Limited is advancing one of the world’s largest undeveloped gold deposits into production and securing a U.S. domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in late 2026/2027. Further discussion and analysis of the Estelle Gold and Critical Minerals Project is available through the interactive Vrify 3D animations, presentations and videos all available on the Company’s website. www.novaminerals.com.au
Forward Looking Statements This press release contains “forward-looking statements” that are subject to substantial risks and uncertainties. All statements, other than statements of historical fact, contained in this press release are forward-looking statements. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” "will” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Limited’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forward-looking statements are based on assumptions as 2
to future events that may not prove to be accurate. These and other risks and uncertainties are described more fully in the section titled “Risk Factors” in the nal prospectus related to the public o ering led with the Securities and Exchange Commission. Forward-looking statements contained in this announcement are made as of this date, and Nova Minerals Limited undertakes no duty to update such information except as required under applicable law.
For Additional Information Please Contact Investor Relations: Dave Gentry, CEO RedChip Companies, Inc. Phone: 1-407-644-4256 Email: [email protected] Craig Bentley Director of Finance & Compliance & Investor Relations E: [email protected] M: +61 414 714 196
Source: NOVA MINERALS LIMITED
3
2026-05-15 Melbourne, Australia, May 15, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Limited (“Nova” or the “Company”) (NASDAQ: NVA) (ASX: NVA) (FRA: QM3) is pleased to provide an opportunity for its shareholders, investors, and the broader market to attend a quarterly update webinar hosted by Redchip Companies as detailed below. This online event, recorded on site in Alaska, will feature Nova Chief Executive O cer Christopher Gerteisen, who will provide an update on the Company’s progress over the past quarter and outline plans for the antimony project. The webinar will also include video footage showcasing the signi cant volume of mining and processing equipment transported to the Estelle Project during this year’s winter freight haul operations, together with an overview of its intended use. Mr Gerteisen will also review key exploration results from the previous eld season, including discoveries at Portage Pass, West Wing and RPM, provide an update on PFS test work for the gold project, and discuss the share and warrant scheme documentation recently distributed to security holders in relation to the Company’s proposed redomiciliation to the United States. If attendees are not able to join the event on the day of the conference, an archived webcast will also be made available on the Company’s website.
Redchip Companies Webinar 1
Time: Registration: Questions:
4.15 pm US EDT Thursday 21 May 2026 6.15 am Australian EST Friday 22 May 2026 To register for the free webinar, please visit: https://www.redchip.com/webinar/NVA/86288361083 Questions may be submitted in advance to [email protected]
Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website. www.novaminerals.com.au
About Nova Minerals Limited Nova Minerals Limited is advancing one of the world’s largest undeveloped gold deposits into production and securing a U.S. domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in late 2026/2027. Further discussion and analysis of the Estelle Gold and Critical Minerals Project is available through the interactive Vrify 3D animations, presentations and videos all available on the Company’s website. www.novaminerals.com.au
Forward Looking Statements This press release contains “forward-looking statements” that are subject to substantial risks and uncertainties. All statements, other than statements of historical fact, contained in this press release are forward-looking statements. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” "will” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Limited’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forward-looking statements are based on assumptions as to future events that may not prove to be accurate. These and other risks and uncertainties are described more 2
fully in the section titled “Risk Factors” in the nal prospectus related to the public o ering led with the Securities and Exchange Commission. Forward-looking statements contained in this announcement are made as of this date, and Nova Minerals Limited undertakes no duty to update such information except as required under applicable law.
For Additional Information Please Contact Investor Relations: Dave Gentry, CEO RedChip Companies, Inc. Phone: 1-407-644-4256 Email: [email protected] Craig Bentley Director of Finance & Compliance & Investor Relations E: [email protected] M: +61 414 714 196
Source: NOVA MINERALS LIMITED
3
2026-05-11
Anchorage Alaska, May 11, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Limited (“Nova” or the “Company”) (NASDAQ: NVA) (ASX: NVA) (FRA: QM3) ) is pleased to announce the successful completion of its 2026 winter freight mobilization to the Estelle Project in Alaska (Figure 1). All essential heavy equipment and supplies needed for the mining, extraction, and processing of antimony ore under the Department of War (DoW) award have now been delivered to site. In addition, ore sorters have been ordered for delivery in the coming months, and procurement has commenced for processing equipment for the downstream antimony re nery at Port MacKenzie. Snow trail construction commenced in November, extending from Willow toward the Estelle Camp, with the team successfully completing its largest-ever freight delivery to site —approximately 1.5 million pounds of freight — throughout March and into early April. To watch a video of showcasing the heavy equipment and supplies transported to the Estelle base camp via this year’s winter snow road click the link below. https://novaminerals.com.au/nova-winter-freight-season-completevideo/
1
Key Deliveries Included: Heavy earthmoving and haulage equipment – To support construction of the Stibium access trail, airstrip expansion, development of the onsite ore sorting and processing facilities, and broader site infrastructure works.
Stibium access trail construction materials – Including 25-foot and 45-foot bridge beams, rig mats, and other associated construction materials.
Crushing, screening, conveying, and ore sorting process plant – To support onsite antimony ore processing operations.
Excavators tted with drill attachments – For mining operations at both the Stibium and Styx antimony prospects
Camp expansion and logistics, transport, and operational support items – Including power generation systems, fuel handling equipment, accommodation and storage units, and a range of personnel and utility vehicles to support ongoing construction, logistics, and site operations.
Nova General Manager and Geologist, Mr Hans Ho man, commented: “We are extremely proud of the entire team - from the procurement folks in town to the operators on the trail and 2
our personnel at camp - everyone came together to deliver the largest freight season ever seen this end of the Skwentna River. With our eet of equipment on site this project is now complete, and we are ready to start three new ones: constructing a trail to Stibium, expanding the existing airstrip, and building an ore sorting and onsite processing plant at camp. Combined with an aggressive drill program, 2026 is shaping up to be a very busy and productive year for Nova.”
3
Figure 1. Map route of Nova’s 2026 winter snow road Photos of the 2026 Snow Road Operations and Equipment Delivered to the Camp Site
4
Figure 2. Mining and processing equipment at the Estelle base camp site
5
Figure 3. Snow road operations showing three snowcats and a D7 bulldozer linked together, combining 1,825 horsepower about to haul the screen plant up the steepest trail section
6
Figure 4. Construction of the Stibium access trail with the Stibium antimony-gold prospect visible in the background.
Quali ed Persons
7
Vannu Khounphakdy, Professional Geologist and member of Australian Institute of Geoscientists contracted by Nova Minerals to provide geologic consulting services. Mr. Khounphakdy holds a Master of Science in Mine Geology and Engineering. He is a quali ed person with at least 5 years experience with this type of project. By reason of education, a liation with a professional association, and past relevant work experience, Mr. Khounphakdy ful lls the requirements of Quali ed Person (QP) for the purposes of SEC Regulation SK-1300 for data QA/QC checks relevant to this announcement. Hans Ho man is a State of Alaska Certi ed Professional Geologist contracted by Nova Minerals to provide geologic consulting services. Mr. Ho man is a member of the American Institute of Professional Geologists and holds a Bachelor of Science degree in Geological Engineering with a double major in Geology and Geophysics. He is a quali ed person with at least 5 years of experience with these types of projects. By reason of education, a liation with a professional association, and past relevant work experience, Mr. Ho man ful lls the requirements of Quali ed Person (QP) for the purposes of SEC Regulation SK-1300 for the technical information presented in this announcement. Christopher Gerteisen, Chief Executive O cer of Nova Minerals, is a Professional Geologist and member of Australian Institute of Geoscientists, and has supervised the preparation of this news release and has reviewed and approved the scienti c and technical information contained herein. Mr. Gerteisen is a "quali ed person" for the purposes of SEC Regulation S-K 1300.
About Nova Minerals Limited Nova Minerals Limited is advancing one of the world’s largest undeveloped gold deposits into production and securing a US domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction. Estelle hosts two de ned multi-million-ounce gold resources, and more than 20 prospects distributed along a 35kilometre mineralized trend, in the proli c Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a US$43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in late 2026/2027. Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website. www.novaminerals.com.au 8
Forward Looking Statements This press release contains “forward-looking statements” that are subject to substantial risks and uncertainties. All statements, other than statements of historical fact, contained in this press release are forward-looking statements. Forward-looking statements contained in this press release may be identi ed by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” "will” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Limited’s current expectations and are subject to inherent uncertainties, risks and assumptions that are di cult to predict. Further, certain forward-looking statements are based on assumptions as to future events that may not prove to be accurate. These and other risks and uncertainties are described more fully in the section titled “Risk Factors” in the nal prospectus related to the public o ering led with the Securities and Exchange Commission. Forward-looking statements contained in this announcement are made as of this date, and Nova Minerals Limited undertakes no duty to update such information except as required under applicable law.
For Additional Information Please Contact Investor Relations: Dave Gentry, CEO RedChip Companies, Inc. Phone: 1-407-644-4256 Email: [email protected] Nova Minerals: Craig Bentley Director of Finance & Compliance & Investor Relations E: [email protected] M: +61 414 714 196
9
Source: NOVA MINERALS LIMITED
10
Prompts
Click prompts to add them under the company line, click again to take one out, then copy the result into your AI chat. Shared by Asian Century Stocks and Uncovered Thai Stocks. Thank you.
Company History
Name and ticker changes, and re-registrations under a new regulatory id. When a ticker stopped being used is not recorded, so former tickers are undated.
| Date | Change | Detail |
|---|---|---|
| Jun 30, 2026 | Reporting currency | Its US reports are in USD instead of AUD from this period. Earlier figures are shown in USD, converted at each period end's exchange rate. |
| — | Former tickers | NVAAF, NVAWW |
ETFs Holding Nova Minerals Limited
Exchange-traded funds whose newest published daily portfolio holds one of the company's listings, largest weight first.