Dalrymple Bay Infrastructure Limited provides capacity to independent customers to ship coal through the Dalrymple Bay Terminal (DBT), located at the Port of Hay Point in Queensland. The terminal predominantly ships metallurgical coal, operating 24 hours a day, seven days a week, and exports various grades to international markets including Japan, China, South Korea, Taiwan, and India. The company’s revenue is derived from Terminal Infrastructure Charges (TIC) and handling fees, with a significant portion of income linked to mines shipping metallurgical coal. Day-to-day operations and maintenance of the terminal are managed by Dalrymple Bay Coal Terminal Pty Ltd, an independent operator owned by a majority of the terminal's customers, under a renewable Operations and Maintenance Contract. The group engages in capital works and infrastructure investments, including NECAP projects, to maintain and expand terminal capacity.

Summarised from the company's own disclosures, fiscal year ended Dec 2025

Industry Transportation Homepage dbinfrastructure.com.au
Sector Energy IR page investors.dbinfrastructure.com.au
Tags
coal export, terminal infrastructure, metallurgical coal, port operations, bulk commodities, Dalrymple Bay Terminal, DBT, Dalrymple Bay Coal Terminal Pty Ltd, Port of Hay Point
Press page —

Metrics

Valuation  
Market cap A$ 2.732B
Market cap (USD) $ 1.911B
P/E —
PEG —
P/BV —
P/S —
P/OCF —
P/FCF —
Dividend yield —
Turnover / mcap —
Returns  
ROE 2.8%
ROI 0.96%
ROIC 0.96%
Profit margin 3.4%
Growth  
Revenue growing Yes
Profits growing No
Revenue up 3y Yes
Revenue up 5y Yes
Earnings growth 3y (net profit CAGR) -24.9%
Quality  
Profitable Yes
Margin expanding No
Buying back stock —
Diluting (TTM) —
Debt/Equity 191.4%
Podcast bulls (TTM) Sign up
Podcast bears (TTM) Sign up
Podcast sentiment (TTM) Sign up
Podcast sentiment % (TTM) Sign up
News sentiment (TTM) 0
Quality score 33.3%
Insiders  
Buys, 1w Sign up
Buys, 1m Sign up
Buys, 1y Sign up
Sells, 1w Sign up
Sells, 1m Sign up
Sells, 1y Sign up

Sign up to see this company's insider trades

Figure FY 2025 FY 2024 FY 2023 FY 2022 FY 2021 FY 2020
Revenue 849.805M 783.827M 654.789M 626.361M 505.253M 23.446M
Net profit 29.256M 81.799M 73.927M 68.974M 129.077M -113.208M

Sign up to see institutional holdings

Sign Up

Podcast Mentions

Sign up to see podcast mentions and sentiment

Sign Up

Issuer Quarterly Report Bull 0 Bear 0 Routine

Dalrymple Bay Infrastructure Limited (ASX:DBI) releases the attached Issuer Quarterly Report for the Quarter ended 30 September 2026 for the purposes of section 283BF of the Corporations Act 2001 (Cth) -ENDSAuthorised for release by the Board of Dalrymple Bay Infrastructure Limited

More information Investor and Media Enquiries Craig Sainsbury [email protected] +61 428 550 499 About Dalrymple Bay Infrastructure Dalrymple Bay Infrastructure (DBI) through its foundation asset, the Dalrymple Bay Terminal (DBT), aims to provide safe and efficient terminal infrastructure and services for producers and consumers of high quality Australian coal exports. DBT, as the world’s largest metallurgical coal export facility, serves as a global gateway from the Bowen Basin and is a critical link in the global steelmaking supply chain. By providing operational excellence and options for capacity expansions to meet expected strong export demand for metallurgical coal, DBI intends to deliver value to securityholders through stable cashflows and ongoing investment to support distributions and growth. dbinfrastructure.com.au Forward Looking Statements This announcement contains certain forward-looking statements with respect to the financial condition, operations and business of the Company and certain plans and objectives of the management of DBI and may contain statements in relation to climate change and energy transition scenarios. These forward-looking statements reflect DBI’s expectation at the date of this announcement (including with respect to its strategies and plans regarding climate change), and are not guarantees or predictions of future performance, outcomes, or statements of facts. Forward-looking statements can be identified by the use of forward-looking terminology, including, without limitation, the terms “believes”, “estimates”, “anticipates”, “expects”, “predicts”, “intends”, “plans”, “goals”, “targets”, “aims”, “outlook”, “guidance”, “forecasts”, “may”, “will”, “would”, “could” or “should” or, in each case, their negative or other variations or comparable terminology. These forward-looking statements include all matters that are not historical facts. Such forward looking statements involve known and unknown risks, uncertainties and other factors which because of their nature may cause the actual results or performance of the Company to be materially different from the results or performance expressed or implied by such forward looking statements. Actual results may materially vary from any forecasts in this announcement. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement, the likelihood of fulfilment of any forward-looking statement, any outcomes expressed or implied in any forward-looking statement or any underlying assumptions on which it is based. To the maximum extent permitted by law, none of DBI, its directors, employees or agents, nor any other person accepts any liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of the information contained in this announcement. For clarity, no representation or warranty, express or implied is given as to the accuracy, completeness or correctness, likelihood of achievement or reasonableness of any forecasts, prospects or returns contained in this announcement nor is any obligation assumed to update such information (including climate-related scenario analysis). Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies. Before making an investment decision, you should consider, with or without the assistance of a financial adviser, whether an investment is appropriate in light of your particular investment needs, objectives and financial circumstances.

Dalrymple Bay Infrastructure Limited Level 25, 140 Creek Street, Brisbane QLD 4000 PO Box 7823 Brisbane QLD 4001

Telephone +61 07 3002 3100

ABN 76 643 302 032

ISSUER QUARTERLY REPORT Issuer:

Dalrymple Bay Infrastructure Limited (DBI)

Debenture/Notes:

A debt obligation comprising an unsecured note issued under the Trust Deed (Notes)

Trustee:

Equity Trustees Limited

Trust Deed:

Unsecured Note Trust Deed dated 20 November 2020 between the Issuer and the Trustee (as amended from time to time)

Period of Report:

Quarter ended 30 September 2026 (Period)

Date of Report:

20 October 2026

Item No

Item

Confirmed? Y / N / N/A

Corporations Act 2001 – Chapter 2L 1.

S283BF(4)(a) - The Issuer and any guarantor has complied at all times with the terms of the Debentures, the Trust Deed and Chapter 2L of the Corporations Act 2001 during the Period.

Yes, complied

S283BF(4)(b) - No circumstances or event arose during the Period that has caused, or could cause, one or more of the following:

Confirmed - No circumstances arose

(i)

any amount deposited or lent under the Debentures to become immediately payable;

(ii) the Debentures to become immediately enforceable; (iii) any other right or remedy under the terms of the Debenture or provisions of the Trust Deed to become immediately enforceable.

Comments

Item No

Item

S283BF(4)(c) - No circumstances arose or occurred during the Period that materially prejudice:

Confirmed? Y / N / N/A Confirmed - No circumstances arose

(i) the Issuer, any of its subsidiaries, or any of the guarantors; or (ii) any security or charge included in or created by the Debentures or the Trust Deed. 4.

S283BF(4)(d) - There has been Confirmed - No no substantial change in the substantial change nature of the business of the Issuer, any of its subsidiaries, or any of the guarantors that has occurred during the Period.

S283BF(4)(e) - None of the following events happened during the Period: (i)

Confirmed - No events arose

the appointment of a guarantor;

(ii) the cessation of liability of a guarantor body for the payment of the whole or part of the money for which it was liable under the guarantee; or (iii) a change of name of a guarantor (if this happens, the Issuer's quarterly report must also disclose the guarantor's new name). 6.

S283BF(4)(f) - If the Issuer has created a security interest where: (i)

the total amount to be advanced on the security interest is indeterminate; and

(ii) the advances are merged in a current account with bankers, trade creditors or anyone else, advise the net amount outstanding on any advances at the end of the Period.

N/A - No new security interest created during the Period

Comments

Item No

Item

S283BF(4)(g) - The Issuer is not aware of any other matters that may materially prejudice any security or the interests of the Debenture holders.

Confirmed - Issuer is not aware

S283BF(5) - If the Issuer has deposited any money with, or lent money to, a related body corporate during the Period, the report must also include details of:

N/A

Confirmed?

Comments

Y / N / N/A

(i)

Loans to related bodies corporate Details of unsecured loans provided during the Period to related bodies corporate to support working capital and unsecured amounts outstanding at the end of the Period. are as follows:

the totals of money deposited with, or lent to, a related body corporate during the Period; and

(a) Dalrymple Bay Infrastructure Management Pty Ltd owed $9,036,194 to DBI at the end of the Period ($4,592,733 as at 30 June 2026).

(ii) the total amount of money owing to the borrower at the end of the Period in relation to those loans

(b) Dalrymple Bay Finance Pty Ltd owed $6,401,384 to DBI at the end of the Period ($5,662,519 as at 30 June 2026). (c) Dalrymple Bay Infrastructure Holdings Pty Ltd owed $25,782,568 to DBI at the end of the Period ($0 as at 30 June 2026)

S283BF(6) - If the Issuer has assumed a liability of a related body corporate during the Period, the report must include details of the liability assumed during the Period and the extent of the liability as at the end of the Period.

N/A - No liability of a related body corporate was assumed during the Period

Item No

Item

S283BF(7) For the purposes of 283BF (5) & (6) above, the report:

Confirmed? Y / N / N/A

(i)

Confirmed Complied

must distinguish between deposits, loans and assumptions of liability that are secured and those that are unsecured; and

(ii) may exclude any deposit, loan or assumption of liability on behalf of the related body corporate if it has: (iii) guaranteed the repayment of the debenture of the borrower; and (iv) secured the guarantee by a charge over all of its property in favour of the trustee.

Corporations Act 2001 – Financial Reports and Audit 11.

The Issuer has complied in all respects with its obligations under Chapter 2M (dealing with financial reports and audit) of the Corporations Act 2001

Confirmed

Corporations Act 2001 – Disclosure 12.

The Issuer has complied at all times with the requirements of Chapter 6CA (dealing with continuous disclosure) of the Corporations Act 2001 and no circumstances arose during the Period that required the Issuer to issue a supplementary prospectus, replacement prospectus or issue a continuous disclosure notice.

Confirmed - Complied and no circumstances arose

If so, advise what steps have been taken. Trust Deed - Negative covenants 13. None

N/A

Comments

Item No

Item

Confirmed?

Comments

Y / N / N/A

Anti-Money Laundering 14. The Issuer has complied in all respects with its obligations Under the Anti-Money Laundering and CounterTerrorism Financing Act 2006 (Cth)

Confirmed

On the basis of the above, the undersigned certify that they are of the view that the financial position and performance of the Issuer is such that the property of the Issuer (and of each guarantor, if relevant) will be sufficient to repay the amount of each Note when it becomes due and payable. This report is made in accordance with a resolution of the directors of the Issuer. Signed:

Liesl Burman Company Secretary

Investor Presentation Bull 0 Bear 0 Routine

Dalrymple Bay Infrastructure Limited (ASX:DBI) (“DBI” or “the Company”) releases the attached Investor Presentation that will be presented at a series of investor conferences and presentations in Asia and Australia during October and November 2026. -ENDSAuthorised for release by the Disclosure Committee of Dalrymple Bay Infrastructure Limited. -ENDS-

More information Investors and Media Craig Sainsbury [email protected] +61 428 550 499 About Dalrymple Bay Infrastructure Dalrymple Bay Infrastructure (DBI) through its foundation asset, the Dalrymple Bay Terminal (DBT), aims to provide safe and efficient terminal infrastructure and services for producers and consumers of high quality Australian coal exports. DBT, as the world’s largest metallurgical coal export facility, serves as a global gateway from the Bowen Basin and is a critical link in the global steelmaking supply chain. By providing operational excellence and options for capacity expansions to meet expected strong export demand for metallurgical coal, DBI intends to deliver value to securityholders through stable cashflows and ongoing investment to support distributions and growth. dbinfrastructure.com.au Forward Looking Statements This announcement contains certain forward-looking statements with respect to the financial condition, operations and business of the Company and certain plans and objectives of the management of DBI and may contain statements in relation to climate change and energy transition scenarios. These forward-looking statements reflect DBI’s expectation at the date of this announcement (including with respect to its strategies and plans regarding climate change), and are not guarantees or predictions of future performance, outcomes, or statements of facts. Forward-looking statements can be identified by the use of forward-looking terminology, including, without limitation, the terms “believes”, “estimates”, “anticipates”, “expects”, “predicts”, “intends”, “plans”, “goals”, “targets”, “aims”, “outlook”, “guidance”, “forecasts”, “may”, “will”, “would”, “could” or “should” or, in each case, their negative or other variations or comparable terminology. These forward-looking statements include all matters that are not historical facts. Such forward looking statements involve known and unknown risks, uncertainties and other factors which because of their nature may cause the actual results or performance of the Company to be materially different from the results or performance expressed or implied by such forward looking statements. Actual results may materially vary from any forecasts in this announcement. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement, the likelihood of fulfilment of any forward-looking statement, any outcomes expressed or implied in any forward-looking statement or any underlying assumptions on which it is based. To the maximum extent permitted by law, none of DBI, its directors, employees or agents, nor any other person accepts any liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of the information contained in this announcement. For clarity, no representation or warranty, express or implied is given as to the accuracy, completeness or correctness, likelihood of achievement or reasonableness of any forecasts, prospects or returns contained in this announcement nor is any obligation assumed to update such information (including climate-related scenario analysis). Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies. Before making an investment decision, you should consider, with or without the assistance of a financial adviser, whether an investment is appropriate in light of your particular investment needs, objectives and financial circumstances.

Dalrymple Bay Infrastructure Limited Level 25, 140 Creek Street, Brisbane QLD 4000 PO Box 7823 Brisbane QLD 4001

Telephone +61 07 3002 3100

ABN 76 643 302 032

Investor Presentation October/November 2026

Dalrymple Bay Infrastructure DBI through its foundation asset, the Dalrymple Bay Terminal (DBT), aims to provide safe and efficient port infrastructure and services for producers and consumers of high quality Australian metallurgical coal exports.

#1

Largest global metallurgical coal export facility1

14%

DBT share of 2025 global seaborne met coal exports2

84.2Mt

Fully contracted volume on a 100% take or pay basis3

$4.02/t

Terminal Infrastructure Charge levied on every tonne of contracted volume from 1 July 20264

100%

Pass though of terminal operating and maintenance costs

84%

Of DBI’s revenue from predominantly metallurgical coal mines5

10

Customers utilising DBT across 20 mines6

2031

Current pricing arrangement expiry

  1. By contracted volume.
  2. Source: AME (2025). % represents calendar year ended 31 December 2025.
  3. To June 2028 with evergreen renewal options for customers, and with socialisation applying to any uncontracted capacity. Refer Note 3 on Slide 6.
  4. The $4.02/t TIC applies from 1 July 2026. The TIC for the 12 months ended 30 June 2026 was $3.72/t

2

  1. Based on each source mine’s total shipping mix over a 3-year rolling period to 30 June 2026.
  2. Customers currently contracted to access DBT as at 30 June 2026. Note: Map is indicative only and may not be drawn to scale. DBI makes no representation and takes no responsibility for the accuracy of the location of mines, rail networks and ports located on the map

Investor Presentation | October 2026

H1-26: Overview (6 months to 30 June 2026) EBITDA

FFO1

Growth

Financing

Distributions

Safety

$150.5m

$92.7M

$370.6m2

$350m

13.5cps3

Zero

+4.7% vs H1-25

  • 10.2% vs H1-25

of capital projects still to be added to the NECAP Asset Base

issued in Australian Medium Term Note market

  • 14.9% vs H1-25

incidents causing serious injury or illness4

  1. FFO is Calculated as EBITDA, less net finance costs (excluding fair value adjustments and amortisation of loan establishment costs and other non-cash items) and less current tax expense (non-statutory).
  2. Based on P95 estimate of costs. Excludes Interest During Construction (IDC). All projects have been unanimously approved by customers.
  3. ‘cps’ is cents per security and reflects the distributions referable to H1-26 (with comparative distributions referable to H1-25)
  4. Reporting on safety metrics for DBI reflects an aggregate of results for DBI employees and NECAP contractors at DBT, but excluding the independent operator of DBT, Dalrymple Bay Coal Terminal Pty Ltd (DBT Operator).

3

Investor Presentation | October 2026

Stable and predictable revenue stream DBI financial performance underpinned by a low-risk business model • TIC applicable at Dalrymple Bay Terminal (DBT) for TY-26/27 of ~$4.02 per tonne, up ~8.1% versus TY-25/26

Key Contract Terms

• TIC applied to every tonne of the terminal’s contracted capacity of 84.2mt

1

100% take or pay contracts

2

Revenue socialisation3

3

Force Majeure protection

4

Pass through of operating and maintenance costs

5

5-year contract renewals

6

Annual uplift in base TIC at CPI

• TIC will continue to grow via Base TIC escalation with inflation and investment in NECAP program TY-23/24 Actual ($/t)

TY-24/25 Actual ($/t)

TY-25/26 Actual ($/t)

TY-26/27 Actual ($/t)

Base TIC

3.32

3.44

3.52

3.66

Base TIC % increase

7.0%

3.6%

2.4%

4.1%

NECAP Charge

0.12

0.16

0.20

0.35

QCA Levy2

0.00

(0.01)

(0.00)

0.00

TIC per contracted tonne

3.44

3.59

3.72

4.02

NECAP Asset Base

94.2

112.9

139.5

232.5

TIC Components1

  1. DBI’s TIC has a fourth component if an expansion were to proceed. In that case, an Expansion Charge would be added to the other three components to arrive at a final TIC rate.
  2. Negative adjustments in TY-24/25 & TY-25/26 due to over-recovery of QCA fees in prior periods.
  3. Revenue for uncontracted capacity will not be socialised through increased charges for remaining Users in three limited circumstances: (1) if DBIM elects to voluntarily resume capacity not being utilised by a User without a reasonable expectation of recontracting to another access seeker, (2) in respect of uncontracted capacity created by an expansion until such capacity is unconditionally contracted for a term of at least 10 years, as required by the 2021 Access Undertaking, with appropriate credit security and for a mine that has achieved first coal at DBT, or (3) if DBIM fails to maintain DBT to be available to operate to its rated design capacity, or enters any agreements with non-coal customers in the future, either of which reduces available capacity, to the extent that available capacity is reduced. DBIM currently has no agreements with non-coal customers at DBT.

4

Investor Presentation | October 2026

Commitment to growing long term total returns for all securityholders Distributions by TIC Year (cps)2, 3

Distributions • Q2-26 distribution of 6.750cps • TY-26/271 guidance of 28.6cps up 8.5% on prior TY distributions Distribution Policy • Target to distribute between 60-80% of FFO • Target DPS growth of 3-7% p.a. for the foreseeable future, subject to business developments and market conditions • DBI will continue to frank distributions to the maximum extent allowable

6.750

7.155

5.025

5.375

5.875

5.025

5.375

5.875

5.025

5.375

5.625

6.750

7.155

5.025

5.375

5.625

6.125

TY-22/23

TY-23/24

TY-24/25

TY-25/26

7.155

Q1

Q2

Q3

Q4

6.750

7.155

TY-26/27

Guidance

FFO Payout Ratio4 (Annual)

TIC Year1

Distributions earned2 (cps)

DPS Growth (%)

TY-23/24

21.5

7.0%

70%

TY-24/25

23.0

7.0%

60%

TY-25/26

26.4

14.7%

TY-26/27

28.6

8.5%

80%

50% FY-22

FY-23

FY-24 Target Range

FY-25

1H-26

FFO payout ratio

  1. TIC Year (TY) runs from 1 July to 30 June. i.e., TY-26/27 is 1 July 2026 to 30 June 2027. Future distributions are guidance only and subject to Board approval, business developments and market conditions which will depend upon future events.
  2. Future distributions in respect of TY-26/27 are guidance only and subject to Board approval, business developments and market conditions which will depend upon future events.
  3. Distributions referrable to TIC Year.
  4. FFO payout ratio calculated as distributions per security referable to the relevant financial year, multiplied by the weighted average total securities on issue over the relevant financial year, divided by FFO referable to the relevant financial year. FY-22 FFO included the backdated revenue true-up earned on finalisation of customer contract negotiations in Q4-22. FY-25 FFO excludes the one-off early repayment costs of $103.0m (and the associated tax benefit of $27.0m) arising from the 2020 USPP Notes refinancing completed in Dec-25. H1-26 FFO payout ratio calculated using information referable to the six months ending on 30 June 2026.

5

Investor Presentation | October 2026

Growth opportunities DBI has a range of growth opportunities that are expected to underpin a continued uplift in revenue, ultimately driving improved FFO to support growing distributions

6

Revenue Initiatives

NECAP

8X

External Opportunities

Capacity optimisation and revised security arrangement initiatives to deliver sustainable revenue uplift

The NECAP program delivers organic growth in the Terminal Infrastructure Charge, and thus future revenue, via investment in the DBT

Expansion option that can be delivered in phases to meet customer demand1

DBI’s competitive advantages, together with defined growth filters, frame the external growth opportunities that may be assessed to drive securityholder value beyond DBT

Distribution guidance of 70-80% of FFO implies $10m of incremental growth over and above TIC revenue will result in an approximate 1.5cps uplift in distributions

DBI retains significant optionality around how many phases of the 8X Project (if any) it undertakes. The project continues to remain subject to several key factors, in particular the outcome of ongoing commercial negotiations with access seekers relating to the phasing, economics and structure of the proposed expansion, as well as DBI’s final investment decision.

Investor Presentation | October 2026

Organic growth: Non-expansion capital expenditure NECAP provides an ongoing growth platform • As amounts are spent on NECAP, interest during construction (IDC) accrues at an agreed rate until the expenditure is added to the NECAP Asset Base. This compensates DBI for the cost of debt funding and provides a return on equity during the period of construction • Once added to the NECAP Asset Base, NECAP spend earns a return on invested capital set at the 10-Year Australian Government Bond rate (reset annually) plus a margin and a return of the invested capital in the form of a depreciation allowance • NECAP spend includes both regular and major project expenditure. Outside of major asset replacements (like SL1 and RL4), spend on regular NECAP projects is typically between $30m to $50m per annum • Capital spent on a project is added to the NECAP Asset Base on 1 July of the year after the project is commissioned, resulting in an uplift in TIC • $97.8m ($91.3m plus $6.5m IDC) was added to the NECAP Asset Base on 1 July 2026 resulting in a $0.15/t increase in TIC NECAP approved by Customers, $m 320 280

NECAP Asset Base, $m

Amounts spent on NECAP, $m

200

250

160

200

120

150

240 200

281

160

80

120 80 40

22.9

26.5

35.5

56.7

39.5

FY21

FY22

FY23

FY24

FY25

Sustaining NECAP

7

9.9

Major Projects

71.4 1H26

54.3

36.0

32.5

27.6

27.8

FY21

FY22

FY23

FY24

Sustaining NECAP

Major Projects

51.9 58.7 FY25

139.5 94.2

100

106.9

40

232.5

50

112.9

51.1

42.0 1H26

July 2022

July 2023

Sustaining NECAP

July 2024

July 2025

July 2026

Major Projects

Investor Presentation | October 2026

NECAP supporting revenue uplift Completion of major NECAP programs will drive a step change in TIC • All current NECAP works have been recommended by the Operator and approved by all customers, demonstrating a strong alignment of interests in efficient investment in DBT

6

• SL1A and RL4, together with many of the other regular NECAP programs are expected to be completed by 30 June 2027

5

• It is currently anticipated that the addition of these NECAP programs into the NECAP Asset Base is expected to deliver an increase to the NECAP charge component of the TIC by a further ~$0.53/t1 by 1 July 2027 from the $0.35/t NECAP Charge component of the TIC that applies for TY26/27 • Every additional $0.10/t of TIC delivers ~$8.5m of incremental revenue per annum • DBI has identified NECAP projects of similar capital spend to existing committed projects which are anticipated to be committed and commence, but not necessarily added to the NECAP Asset Base, by 2030, supporting longer term growth in TIC post TY-30/31

Pricing agreements through Light Handed Regulatory Regime2,3 Illustrates SL1A & RL4 commission

4.02 4

3.59

3.72

3

2

24/25 TIC

25/26

26/27

Base TIC (2.5% CPI)

27/28

28/29

NECAP Charge: Based on Prudent NECAP completed by the relevant 30 June

29/30

30/31

NECAP Charge: Based on potential future committed NECAP

  1. Assumes approx. $300m of direct capex added to the NECAP Asset Base, as well as IDC on 1 July 2027, and a 10-year Commonwealth Government Bond rate of 4.5% from 1 July 2027.
  2. Estimate only. NECAP Projects are subject to the prudency procedures under clause 12.10 of the 2021 AU in order to be included in the NECAP Charge. NECAP is deemed prudent where it was recommended by the Operator and was approved by all customers to be incurred, which applies to all of the current committed NECAP projects.
  3. Figures represent TIC Year. TIC labels represent the TIC per contract tonne. DBT is fully contracted at 84.2Mtpa to 30 June 2028 with evergreen renewal options for customers. 2027/28-2030/31 scenario is indicative only and does not represent a forecast or future outlook. Scenario assumes inflation of 2.5% p.a. (light shading); 10yr Australian Government Bond rate of 4.5% from July 2027, noting it is reset annually; Potential NECAP expenditure on a reasonable estimate of commissioning profile; QCA fees are included in the data but not illustrated as they are negligible; 8X Project not included.

8

Investor Presentation | October 2026

8X expansion works Capacity expansion project within the existing terminal footprint that can be delivered in phases to meet customer demand • 8X provides an export pathway for new mine developments and expansions in the Central Bowen Basin which will be required to meet expected uplift in global metallurgical coal demand • 8X is a well-defined pathway to 99.1Mtpa of contracted capacity • There is approximately 31Mtpa of aggregate demand in the DBT access queue as at 30 April 20261 • Phased approach to 8X allows expanded DBT capacity to be matched with mine development and ramp up requirements • Any access seeker that commits to 8X will likely be subject to a higher charge than the TIC paid by existing customers • Cost of an 8X expansion expected to be socialised across existing and expanding customers2 Capacity3 Mtpa

Cost4 $m

Phase

Description

1

SL4 on Berth 3

4.4

538

2

Stockpile Augmentation

4.1

335

3

New Inloading systems

6.4

710

14.9

1,583

Total

Global demand for seaborne metallurgical coal expected to be satisfied by increased Australian exports5 85 376

2025

Australia

21

17 -2

USA

Russia

-7

-13

Canada

Mongolia

-1

Mozambique Rest of World

476

2040

DBT Access Queue1

  1. Includes 8X Access Seekers
  2. See the QCA Price Ruling at: https://www.qca.org.au/project/dalrymple-bay-coal-terminal/dbims-2021-access-undertaking-2/application-for-price-ruling-8x-expansion/
  3. DBI retains significant optionality around how many phases of the 8X Project (if any) it undertakes. The project continues to remain subject to several key factors, in particular the outcome of ongoing commercial negotiations with access seekers relating to the phasing, economics and structure of the proposed expansion, as well as DBI’s final investment decision.
  4. FEL3 capital cost estimate is the estimate at completion with a P95 confidence level inclusive of escalation (at an assumed rate) and an assumed commencement date of 1 April 2028. This cost will likely require adjustment when the actual commencement date is known to reflect the then applicable cost environment.
  5. 2025 – AME.

9

Investor Presentation | October 2026

Investment grade balance sheet DBI proactively manages its debt portfolio to deliver benefits to the business and shareholders Debt Profile

Net Debt to EBITDA8

Credit Profile

Total Limit1

A$2.35bn limit with A$2.06bn drawn at 30 June 2026

Liquidity2

A$261.4 million

Tenor3

6.3 years

Weighted average all-in interest rate4

7.0%

Rating5

BBB / Stable (S&P)

Debt Service Coverage Ratio6

2.6x (S&P downgrade threshold ≤1.4x)

S&P Gearing Threshold7

c.A$415 million debt headroom under S&P gearing threshold for BBB rating

7x

6x FY-22

Debt Maturity Profile at 30 June 2026 (by Facility Limit, $ million)1

FY-23

FY-24

FY-25

1H-26

Net debt to EBITDA

24

Debt Portfolio at 30 June 2026 (Drawn debt) 20

675

80

16 350

185

145 2026

2027

2028

2029

2030

USPP Notes

Revolvers

DSR facility

Liquidity facility

2031

2032

AMTN Notes

583 276 2033

AMTN

Bank Debt

2034-2038

Derivative Structured Products

  1. Based on facility limits at 30 June 2026 with USD borrowings converted to AUD at hedged swap-back rate A $25m undrawn bilateral facility was cancelled in August 2026 to reduce the Revolvers due for maturity in 2028 to $120m. The DSR Facility and Liquidity Facility maturity dates were extended by 12-months in September 2026 and both facility now mature in 2029.
  2. Excludes the $80m restricted DSR Facility. Liquidity calculated as cash of $44.9m and undrawn revolving bank facilities of $216.5m as at 30 June 2026.
  3. Weighted average debt tenor based on drawn debt as at 30 June 2026.
  4. Weighted average all-in interest rate based on current drawn bank debt, derivatives and derivative structured products as at 30 June 2026, adjusted for $300m interest rate swaps that matured on 6 July 2026.
  5. Ratings issued by S&P in respect of Dalrymple Bay Finance Pty Ltd, a wholly owned subsidiary of DBI. The Fitch rating was formally withdrawn on 27July 2026 at the request of DBI.
  6. Debt Service Coverage Ratio excludes the one-off early repayment costs (-$103.0m) and associated tax benefit ($27.0m) related to repayment of 2020 USPP Notes in December 2025.
  7. Gearing is calculated as Net Debt to Capital Asset Base. Under the S&P base case, gearing does not exceed 85%.
  8. Net Debt to EBITDA Ratio for H1-26 calculated using EBITDA for 12 months ending 30 June 2026.

10

Derivative Structured Products

$2.06bn

USPP Investor Presentation | October 2026

Strategic priorities over FY-26 DBI’s strategic priorities are focussed on delivering total securityholder returns Delivering organic revenue growth through new revenue initiatives and the inclusion

1 of the cost of completed NECAP Projects in the NECAP Asset Base

2 Completion of Shiploader 1A and Reclaimer 4 NECAP projects on time and on budget 3

Progressing opportunities to capture long-term Bowen Basin metallurgical coal production via our continued review of use of terminal capacity, including optimisation of existing capacity and our economic assessments of the 8X Project

4

Further assessment of refinancing opportunities to improve balance sheet flexibility, reduce refinancing exposure and access other sources of debt capital to reduce interest costs over the long term whilst maintaining an investment grade credit rating

5

Identifying opportunities for diversification through acquisition of assets that have a similar risk profile to the existing DBI business and value that can be created through our competitive advantages

6 Continuing to explore and assess opportunities for future alternative uses of DBT 7 Delivering whole-of-terminal ESG and sustainability initiatives 11

Investor Presentation | October 2026

Appendices

12

DBI’s financial performance is underpinned by a low-risk business model Light-handed regulation

Force Majeure protection

Pass through of operating costs

DBI has a pricing agreement with customers on the Terminal Infrastructure Charge (TIC) and returns on nonexpansion capital expenditure (NECAP) to 2031 and then will renegotiate those charges directly with customers.1

DBI has strong force majeure protection for terminal disruption, including for weather events and events arising from operator performance, which ensures continued receipt of revenue despite disruption to terminal operations.

All the terminal’s operating and maintenance costs are passed through to customers. DBI takes no risk on operational performance nor increases in operating or maintenance costs.

Take or pay contracts

Revenue growth through inflation and NECAP

Socialisation Mechanisms

Regardless of the tonnes exported, DBI receives the TIC on every tonne of the terminal’s annual contracted capacity of 84.2Mt. All capacity is fully contracted to at least 2028.

Under the pricing agreement to 2031, the Base TIC inflates annually at Australian CPI. NECAP receives a return on capital expended at the 10-year Australian Government bond rate (reset annually) plus a fixed margin as well as a return of capital over a defined period.

Where any capacity becomes uncontracted, revenue for uncontracted capacity is socialised through a proportionate increase in charges to contracted customers, other than in limited circumstances.2

  1. In accordance with the pricing review mechanism under the Access Agreements with customers within the 'negotiate-arbitrate' light-handed regulatory framework administered by the QCA
  2. Revenue for uncontracted capacity is socialised through increased charges for remaining customers other than in three limited circumstances: 1) if DBI elects to voluntarily resume capacity not being utilised by a customer without a reasonable expectation of recontracting to another access seeker, 2) in respect of uncontracted capacity created by an expansion until such capacity is unconditionally contracted for a term of at least 10 years, as required by the 2021 Access Undertaking, with appropriate credit security and for a mine that has achieved first coal at DBT, or 3) if DBI fails to maintain DBT to be available to operate to its rated design capacity, or enters any agreements with non-coal customers in the future (either of which reduces available capacity), to the extent that available capacity is reduced. DBI currently has no agreements with non-coal customers at DBT

13

Investor Presentation | October 2026

DBI, via the Dalrymple Bay Terminal, services predominantly metallurgical coal mines in the Bowen Basin Contracted Capacity1

DBI Customer base1 Customer2

Mine

Anglo American

German Creek, Moranbah North, Grosvenor3

Argo Resources

Carborough Downs, Broadlea, Ironbark No.1

Glencore

Clermont, Oaky Creek, Hail Creek

Middlemount Coal

Middlemount

QMetco Limited

Foxleigh

Peabody

Coppabella, Moorvale, Centurion

Pembroke Resources

Olive Downs

Stanmore Resources

South Walker Creek, Poitrel, Isaac Plains

TerraCom

Blair Athol

Whitehaven Coal

Daunia

  1. As at 30 June 2026.
  2. The referenced customers are the operating or majority Joint Venture partner in the mine. Some of these mines have additional minority Joint Venture interests that are not listed on this slide.
  3. Grosvenor did not export through DBT during H1-26 as it was not operating during this period

14

Investor Presentation | October 2026

Interest rate and hedge book profile No FX risk and limited interest rate risk with high level of fixed debt issuance and floating to fixed swaps • 100% of all foreign currency debt swapped back to AUD – no FX risk • Interest rate risk is managed via a mix of fixed rate debt issuance and interest rate swaps • Maintaining a highly hedged interest rate position remains a priority • DBI’s weighted average all-in interest rate for its debt book was 7.01% at 30 June 2026 and is expected to remain at approximately that level for the next 24 months assuming future debt drawn utilises the existing Revolvers

Profile of hedged position at 30 June 2026 (A$ million) 1, 2 2,500

120%

2,000

100% 80%

1,500

60%

1,000

40%

500

20% 2026

2027

2028 Fixed (LH axis)

2029 Floating (LH axis)

2030

2031

0%

% fixed (RH axis)

Summary of Debt at 30 June 2026 Drawn3 ($m)

Undrawn ($m)

Total3 ($m)

Up to 1 year

Between 1 and 2 years

Between 2 and 5 years

973.5

216.5

1,190.0

Greater than 5 years

1,083.7

1,083.7

Total

2,057.2

216.5

2,273.7

Year

Hedged2, 4

Weighted average interest rate2, 5

90.1%

7.01%

90.1%

7.01%

Repayment Profile

Principal repaid at maturity

  1. Figures in the chart assume the $2.06bn drawn debt balance at 30 June 2026 remains unchanged over time, in order to demonstrate the level of hedging in place
  2. Adjusted for A$300m fixed-to-float interest rate swaps which matured on 6 July 2026
  3. Borrowings denominated in foreign currency are converted at the rate applicable at the time cross currency swaps are put in place.
  4. Hedged percentage comprises drawn fixed rate debt and floating rate debt that has been hedged via interest rate swaps as a proportion of drawn debt as at 30 June 2026.
  5. Calculated in effective currency after hedging. USD debt converted at the hedged rate under cross currency swaps that are in place.

15

Investor Presentation | October 2026

Current NECAP projects Major projects SL1A and RL4 are anticipated to be added to the NECAP Asset Base from 1 July 20271 • All capital spent on NECAP has been approved for inclusion in the NECAP Asset Base • At 1 July 2026, the current NECAP program had a total of $370.6m in projects underway still to be added to the NECAP Asset Base, with ~$300m (+IDC) expected to be added to the NECAP Asset Base on 1 July 2027. This is expected to result in ~$0.53/t uplift in the NECAP charge component of the TIC as compared to the NECAP Charge component of the TIC that applies for TY-26/27 • A new $38.5m regular NECAP program, Series Z, was unanimously approved by customers on 13 July 2026 Spent but yet to be added to NECAP Asset Base2

Still to Spend

Balance yet to be included in NECAP Asset Base

Approved

Spent to Date2

Added to NECAP Asset Base2

NECAP T – Reclaimer RL4

115.6

82.3

82.3

33.3

115.6

NECAP U – Shiploader SL1A

165.4

139.8

4.5

135.3

25.6

160.9

Regular NECAP Series

319.6

237.7

223.5

14.2

79.7

94.1

Approved NECAP Series $m

Interest During Construction

17.8

Amortisation

(13.3)

Total at 1 July 2026

600.6

459.8

232.5

231.8

138.8

370.6

NECAP Z (unanimously approved 13 July 2026)

38.5

38.5

38.5

Total as at 13 July 2026

639.1

459.8

232.5

231.8

177.2

409.0

  1. NECAP Projects are subject to the prudency procedures under clause 12.10 of the 2021 AU in order to be included in the NECAP Charge. NECAP is deemed prudent where it was recommended by the Operator and was approved by all customers to be incurred.
  2. As at 1 July 2026

16

Investor Presentation | October 2026

Climate reporting and disclosures In February 2026, DBI released its first Sustainability Report prepared in accordance with AASB S2 DBI prepared its 2025 Sustainability Report in accordance with AASB S2 Climate-related Disclosures, the Australian Sustainability Reporting Standard issued by the Australian Accounting Standards Board. This represented DBI’s first AASB S2-compliant sustainability report, covering the reporting period commencing 1 January 2025.

17

DBI’s disclosures provide: • Alignment of climate considerations with strategy, capital allocation and governance. • Clear, transparent climate communication for stakeholders. • Detailed climate scenario analysis. • Improving maturity of core climate data, processes and methodologies over time.

Principles of disclosure approach: • Transparency: Clear explanations of judgments, assumptions and uncertainties. • Proportionality: Providing information that is useful and relevant. • Integrity: Ensuring disclosures reflect reasonable and supportable information. • Consistency: Aligning methods, metrics and processes across reporting years.

Investor Presentation | October 2026

Governance

Social

Social and Governance highlights Safety, Health & Wellbeing For each financial year, the Group sets a comprehensive set of leading indicators that reflect the proactive actions the Group will take during the year to positively impact safety at DBT. The Group reports on 2 lagging indicators: Fatalities, Serious Injuries or Illnesses1 and High Potential Incidents (HPI).2 During H1-26, DBI and its NECAP contractors had no Fatalities, Serious Injuries or Illnesses3 and 2 HPIs.

Employee Diversity and Inclusion Diversity, Equity and Inclusion is a cultural cornerstone enabling DBI to be resilient and thrive through growth and change. DBI conducts regular employee surveys, consultation and team communications to monitor engagement and feedback from all employees. Female representation at all levels is a priority. The DBI Board includes 57% female directors and the DBI executive team includes 43% female leaders.

Corporate Governance DBI’s corporate governance framework embeds an integrated approach to governance within DBI and is overseen by a skilled, diverse and independent Board of Directors. Three new non-executive directors have been appointed since September 2025. DBI’s risk management is embedded throughout the organisation’s activities. New and emerging risks, including climate-related risks, and their related controls and mitigations are regularly reviewed and presented to the DBI Board.

Sustainable Procurement DBI conducts due diligence on its suppliers and vendors to ensure they comply with relevant laws and regulations, including those relating to modern slavery, health and safety, and anti-bribery and corruption. For the new shiploader and the new reclaimer currently under construction, more than 95% of the procurement has been contracted with Australian companies and over 90% of this is being manufactured or fabricated within Australia.

Community and Partnerships During H1-26, DBI continued to deliver its Community Investment, Partnership and Sponsorship Program, supporting initiatives focused on education, sustainability and community wellbeing. Key activities included renewing DBI's partnership with Healthy Rivers to Reef to deliver STEM Schools workshops across the Mackay, Whitsunday and Isaac regions, helping to build environmental awareness and future workforce capability. DBI also continued its support of community programs that create positive social and environmental outcomes across the regions in which it operates.

  1. Serious injury or illness is as defined in Work Health and Safety Act 2011 (Qld).
  2. A High Potential Incident is an incident has caused or has the potential to cause a fatality or permanent disability or serious injury or illness of a person(s).
  3. Reporting on safety metrics for DBI reflects an aggregate of results for DBI and all DBI contractors at DBT, but excluding the independent operator of DBT, Dalrymple Bay Coal Terminal Pty Ltd (DBT Operator). The DBT Operator is owned by a majority of DBT’s customers (by contracted tonnage) and is responsible for the day-to-day operations and maintenance of DBT under a renewable Operations and Maintenance Contract (OMC).

18

Investor Presentation | October 2026

Statement of profit or loss (6 months to 30 June 2026) H1-26 Revenue and EBITDA up on H1-25, demonstrating resilience of business model Notes

Notes

H1-26

H1-25

156.5

151.1

TIC revenue increased by 3.6% on H1-25, in line with the increase in the TIC applicable during H1-26 ($4.02/t) as compared to H1-25 ($3.72/t).

Handling revenue

181.8

171.3

Revenue from capital works

92.3

72.4

The increase in the TIC reflects the annual adjustment for inflation, contribution of commissioned NECAP to the NECAP charge component of the TIC and passthrough of the QCA Levy.

2.7

0.6

Total income (excl. interest income)

433.3

395.4

Handling costs

(181.8)

(171.3)

G&A expenses

(8.7)

(7.9)

Capital works costs

(92.3)

(72.4)

Profit & Loss, A$ million STATUTORY TIC revenue

Other revenue

1

2

TIC Revenue

Other Revenue Capacity optimisation initiatives and revised customer security arrangements have delivered revenue uplift at no additional cost or invested capital.

3

EBITDA H1-26 EBITDA up 4.7% on H1-25 withH1-26 EBITDA margin remaining consistent with H1-25.

4

Net Finance Costs

EBITDA (non-statutory)

150.5

143.8

EBTIDA Margin1 (non-statutory)

95%

95%

Net finance costs include interest on borrowings (net of interest income) together with non-cash items such as interest on loan notes attributable to DBI’s securityholders, unrealised (gains) / losses on hedging instruments and amortisation of upfront loan establishment costs.

Net finance costs

(55.8)

(58.3)

Depreciation and amortisation

(20.5)

(20.1)

Net interest costs have remained flat over H1-26, despite increased debt funding of NECAP. This is a direct result of the debt refinancing completed in December 2025 in response to compression in credit spreads observed in credit markets.

Net profit before tax

74.2

65.4

Components of net finance costs, A$ million

H1-26

H1-25

% change

Income tax expense

(25.0)

(22.3)

Net finance costs

55.8

58.3

(4.3%)

Net profit after tax

49.2

43.1

Add back: Interest capitalised on NECAP projects

7.3

3.8

92.1%

Less: non- cash finance costs

(12.0)

(10.4)

15.4%

Net interest costs borne

51.1

51.7

(1.2%)

  1. EBITDA Margin calculated as EBTIDA divided by TIC & Other Revenue.

19

Investor Presentation | October 2026

Statement of cash flows (non-statutory) (6 months to 30 June 2026) H1-26 Revenue, EBITDA and FFO all up on H1-25, demonstrating resilience of business model Cashflow, A$ million

Notes

H1-26

H1-25

TIC revenue

156.5

151.1

G&A Expenses

(8.7)

(7.9)

Other Revenue

2.7

0.6

EBITDA

150.5

143.8

Net Finance Costs

(43.8)

(47.9)

Current tax expense

(14.0)

(11.8)

Funds from Operations (FFO)

92.7

84.1

(93.6)

(57.5)

(7.3)

(3.8)

Other Income (excluding interest income)

Capital expenditure

Capitalised borrowing costs Proceeds from borrowings

758.5

31.0

Repayments of borrowings

(768.0)

(31.0)

Loan establishment costs paid

(2.3)

Dividend Payment

(30.0)

(39.2)

Distribution - part repayment of the stapled loan notes

(36.9)

(17.9)

Movement in net working capital

42.9

(12.5)

Cash and equivalents at beginning of period

110.5

89.9

Net (decrease)/increase in cash

(44.0)

(46.8)

Cash and equivalents at end of period

66.5

43.1

20

Notes 1

Capital expenditure Capital expenditure comprises the spend on NECAP projects (see Appendix for further detail). Progress on major asset replacements has contributed to the increased capital expenditure during H1-26 as compared to H1-25.

2

Borrowings and Derivatives During H1-26 the Group completed the successful issuance of $350m 5-year fixed rate notes under a new Australian Medium-Term Note (AMTN) programme, with a fixed coupon of 6.234% per annum and a maturity date of 24 March 2031. The Group also repaid and cancelled the $250m Syndicated Term Facility which was due to mature in December 2027.

3

Loan Establishment costs Upfront costs associated with AMTN note issuance (refer to note 2).

4

Distributions Distributions in H1-26 consist of unfranked dividends and partial repayments of securityholder loan notes (H1-25: dividends (85% franked) and partial repayments of securityholder loan notes).

5

Movement in net working capital Favourable movement in net working capital during H1-26 relates to over-collection of handling charges from customers over the 12 months ended 30 June 2026 ($14.9m during H1-26, $22.5m over the 12 months ended 30 June) together with a net increase in amounts owing to DBT’s third party operator ($23.2m during H1-26).

Investor Presentation | October 2026

Glossary $

Australian Dollar unless otherwise stated

Group

DBI and its wholly owned or controlled entities

/t

Per metric tonne

m

Million

8X Project

Expansion program to bring terminal capacity to a maximum of 99.1Mtpa

Mt

Million tonnes

AU

Access Undertaking. Sets out the terms of terminal access, the process to negotiate access and the process for resolving disputes, that is approved by the QCA

Mtpa

Million tonnes per annum

AUD

Australian dollars

NECAP

Non-expansion capital expenditure

DBI

Dalrymple Bay Infrastructure Limited (ACN 643 302 032) and, where the context requires, includes members of the Group

Operator

Dalrymple Bay Coal Terminal Pty Ltd

QCA

Queensland Competition Authority

DBT

Dalrymple Bay Terminal

EBITDA

Earnings Before Interest, Tax, Depreciation and Amortisation

TIC

Terminal Infrastructure Charge, being a charge that is paid by all customers

ESG

Environmental, Social and Governance

USPP

United States Private Placement

FFO

Funds From Operations means EBITDA, less net finance costs (excluding fair value adjustments and amortisation of loan establishment costs and other non-cash items) and less current tax expense.

21

Investor Presentation | October 2026

Disclaimer and important notices This presentation has been prepared by Dalrymple Bay Infrastructure Limited ACN 643 302 032 (DBI or the Company). Summary Information This presentation contains summary information about the Company and its related entities and their activities, current as at 19 October 2026, unless otherwise stated. The information in this presentation does not purport to be complete. It should be read in conjunction with DBI’s other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange, which are available at www.asx.com.au. Not an Offer This presentation is not, and does not constitute, or form any part of, an offer to sell or issue, or the solicitation, invitation or recommendation to purchase any DBI securities or any other financial products. Not financial product advice Reliance should not be placed on the information or opinions contained in this presentation. This presentation is for informational purposes only and is not financial product or investment advice or a recommendation to acquire DBI securities and does not take into consideration the investment objectives, financial situation or particular needs of any particular investor. You should make your own assessment of an investment in DBI. In all cases, you should conduct your own research of the Company and analysis of the financial condition, assets and liabilities, financial position and performance, profits and losses, prospects and business affairs of DBI and its business, and the contents of this presentation. You should seek legal, financial, tax and other advice appropriate to your jurisdiction. Past performance Past performance information given in this presentation is given for illustrative purposes only and should not be relied upon as an indication of (and gives no guidance as to) future performance. Future performance This presentation contains certain forward-looking statements (including financial forecasts) with respect to the financial condition, operations and business of the Company and certain plans and objectives of the management of DBI, and may contain statements in relation to climate change and energy transition scenarios. These forward-looking statements reflect DBI’s expectation at the date of this investor presentation (including with respect to its strategies and plans regarding climate change), and are not guarantees or predictions of future performance, outcomes, or statements of facts. Forward-looking statements can be identified by the use of forward-looking terminology, including, without limitation, the terms “believes”, “estimates”, “anticipates”, “expects, “predicts”, “intends”, “plans”, “goals”, “targets”, “aims”, “outlook”, “guidance”, “forecasts”, “may”, “will”, “would”, “could” or “should” or, in each case, their negative or other variations or comparable terminology. These forward-looking statements include all matters that are not historical facts. Such forward looking statements involve known and unknown risks, uncertainties and other factors which because of their nature may cause the actual results, performance or distributions of the Company to be materially different from the results, performance or distributions expressed or implied by such forward looking statements. Actual results may materially vary from any forecasts in this presentation. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation, the likelihood of fulfilment of any forward-looking statement, any outcomes expressed or implied in any forward-looking statement or underlying assumptions on which it is based. To the maximum extent permitted by law, none of DBI, its directors, employees or agents, nor any other person accepts any liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of the information contained in this presentation. For clarity, no representation or warranty, express or implied is given as to the accuracy, completeness or correctness, likelihood of achievement or

22

reasonableness of any forecasts, prospects or returns contained in this presentation nor is any obligation assumed to update such information (including climate-related scenario analysis). Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies. Before making an investment decision, you should consider, with the assistance of a financial adviser, whether an investment is appropriate in light of your particular investment needs, objectives and financial circumstances. Financial data All figures in the presentation are Australian dollars ($ or A$) unless stated otherwise. A number of figures, amounts, percentages, estimates, calculations of value and fractions in this presentation are subject to the effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this presentation. Industry and market data DBI has commissioned AME Mineral Economics Pty Ltd (AME) to provide certain information for inclusion in this document. Information provided by AME is referred to in this document as ‘AME’. This document uses market data, statistics and third-party estimates, projections and forecasts relating to the industries, segments and end markets in which DBI operates. Such information includes, but is not limited to statements, statistics and data relating to product segment and market share, estimated historical and forecast market growth, market sizes and trends, and DBI’s estimated market share and its industry position. DBI has obtained market data, statistics and other information from databases and research prepared by third parties, including reports and information prepared by the AME and other third parties, and other sources. AME has advised that (i) information in their databases is derived from their estimates, subjective judgements and third-party sources, (ii) the information in the databases of other coal industry data collection agencies will differ from the information in their databases, (iii) forecast information is highly speculative and no reliance may be placed on this data. In the compilation of the AME, statistical and graphical information will be unreliable, inaccurate and will contain errors of fact and judgement. It is subject to full validation and the provision of such information requires investors to make appropriate further enquiries. Investors should note that market data and statistics are inherently predictive, subject to uncertainty and not necessarily reflective of actual market conditions. There is no assurance that any of the third-party estimates or projections contained in this information, including information provided by AME, will be achieved. DBI has not independently verified, and cannot give any assurances to the accuracy, completeness or reliability of, these market and thirdparty estimates and projections. Estimates involve risks and uncertainties and are subject to change based on various known and unknown risks, uncertainties and other factors. Non-IFRS financial measures This presentation refers to certain measures that DBI uses to manage and report on its business that are not recognised under Australian Accounting Standards. These measures are collectively referred to as “non-IFRS financial measures” under Regulatory Guide 230 ‘disclosing non-IFRS financial information’ published by ASIC. The disclosure of such non-IFRS financial measures in the manner included in this document may not be permissible in a registration statement under the U.S. Securities Act. Although DBI believes that these measures provide useful information about the financial performance of DBI, these non-IFRS financial measures do not have a standardised meaning prescribed by Australian Accounting Standards and therefore may not be comparable to similarly titled measures presented by other entities, and should not be construed as an alternative to other financial measures determined in accordance with Australian Accounting Standards. They should be considered as supplements to the financial statement measures that have been presented in accordance with the Australian Accounting Standards and not as a replacement for them. Any non-IFRS financial information included in this report has been labelled or referred to as “non-statutory” or “non-IFRS” to differentiate it from statutory or IFRS financial information. Non-IFRS information is not subject to audit or review.

Investor Presentation | October 2026

Change in substantial holding Bull 0 Bear 0 Routine

604

page 1/2 15 July 2001

Form 604 Corporations Act 2001 Section 671B

Notice of change of interests of substantial holder To Company Name/Scheme

DALRYMPLE BAY INFRASTRUCTURE LTD

ACN/ARSN

643 302 032

  1. Details of substantial holder(1) Name

BlackRock Group (BlackRock Inc. and subsidiaries named in Annexures

ACN/ARSN (if applicable)

to this form)

There was a change in the interests of the substantial holder on The previous notice was given to the company on The previous notice was dated

07 / 10 / 2026 31 / 08 / 2026 27 / 08 / 2026

  1. Previous and present voting power The total number of votes attached to all the voting shares in the company or voting interests in the scheme that the substantial holder or an associate (2) had a relevant interest (3) in when last required, and when now required, to give a substantial holding notice to the company or scheme, are as follows: Class of securities (4)

Previous notice Person's votes 24,789,905

ORD

Present notice Person's votes

Voting power (5) 5.00

29,931,527

Voting power (5) 6.03

  1. Changes in relevant interests Particulars of each change in, or change in the nature of, a relevant interest of the substantial holder or an associate in voting securities of the company or scheme, since the substantial holder was last required to give a substantial holding notice to the company or scheme are as follows: Date of change

Person whose relevant interest changed

Nature of change (6)

Consideration given in relation to change (7)

Class and number of securities affected

Person's votes affected

Class and number of securities

Person's votes

See Annexure A

  1. Present relevant interests Particulars of each relevant interest of the substantial holder in voting securities after the change are as follows: Holder of relevant interest

Registered holder of securities

See Annexure B

Person entitled to be registered as holder (8)

Nature of relevant interest (6)

604

page 2/2 15 July 2001

  1. Changes in association The persons who have become associates (2) of, ceased to be associates of, or have changed the nature of their association (9) with, the substantial holder in relation to voting interests in the company or scheme are as follows: Name and ACN/ARSN (if applicable)

Nature of association

  1. Addresses The addresses of persons named in this form are as follows: Name

Address

Annexure C

Signature print name Audrey Bassett

capacity *Authorised Signatory

sign here

date

09 /

10

/ 2026

  • At a meeting of the Board on 22 November 2013, the Directors resolved to approve the delegation of the preparation and lodgement of substantial shareholder notices on behalf of BlackRock Investment Management (Australia) Limited. DIRECTIONS (1)

If there are a number of substantial holders with similar or related relevant interests (eg. a corporation and its related corporations, or the manager and trustee of an equity trust), the names could be included in an annexure to the form. If the relevant interests of a group of persons are essentially similar, they may be referred to throughout the form as a specifically named group if the membership of each group, with the names and addresses of members is clearly set out in paragraph 6 of the form.

(2)

See the definition of "associate" in section 9 of the Corporations Act 2001.

(3)

See the definition of "relevant interest" in sections 608 and 671B(7) of the Corporations Act 2001.

(4)

The voting shares of a company constitute one class unless divided into separate classes.

(5)

The person's votes divided by the total votes in the body corporate or scheme multiplied by 100.

(6)

Include details of: (a) any relevant agreement or other circumstances because of which the change in relevant interest occurred. If subsection 671B(4) applies, a copy of any document setting out the terms of any relevant agreement, and a statement by the person giving full and accurate details of any contract, scheme or arrangement, must accompany this form, together with a written statement certifying this contract, scheme or arrangement; and (b)

any qualification of the power of a person to exercise, control the exercise of, or influence the exercise of, the voting powers or disposal of the securities to which the relevant interest relates (indicating clearly the particular securities to which the qualification applies).

See the definition of "relevant agreement" in section 9 of the Corporations Act 2001. (7)

Details of the consideration must include any and all benefits, money and other, that any person from whom a relevant interest was acquired has, or may, becom`e entitled to receive in relation to that acquisition. Details must be included even if the benefit is conditional on the happening or not of a contingency. Details must be included of any benefit paid on behalf of the substantial holder or its associate in relation to the acquisitions, even if they are not paid directly to the person from whom the relevant interest was acquired.

(8)

If the substantial holder is unable to determine the identity of the person (eg. if the relevant interest arises because of an option) write "unknown".

(9)

Give details, if appropriate, of the present association and any change in that association since the last substantial holding notice.

Annexure A This is Annexure A of 3 pages referred to in form 604 Notice of change of interests of substantial shareholder

09-Oct-26 Date

Audrey Bassett, Authorised Signatory 5. Consideration

DALRYMPLE BAY INFRASTRUCTURE LTD (DBI) Date of Change 28-Aug-26 01-Sep-26 01-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 02-Sep-26 03-Sep-26 03-Sep-26 03-Sep-26 03-Sep-26 04-Sep-26 09-Sep-26 09-Sep-26 10-Sep-26 10-Sep-26 10-Sep-26 11-Sep-26 15-Sep-26 15-Sep-26 15-Sep-26 16-Sep-26 16-Sep-26 16-Sep-26

DBI

Nature of change (6) / Consideration given in relation to change (7)

CCY

in specie in specie on mkt buy

n/a n/a 5.13

AUD AUD AUD

ORD ORD ORD

38,592 64,320 1,964

38,592 64,320 1,964

on mkt buy on mkt buy

5.20 5.20

AUD AUD

ORD ORD

301 248

301 248

on mkt buy

5.20

AUD

ORD

248

248

on mkt buy

5.20

AUD

ORD

321

321

on mkt buy on mkt buy on mkt buy on mkt buy

5.22 5.22 5.22 5.22

AUD AUD AUD AUD

ORD ORD ORD ORD

22,845 564,326 154,765 236,260

22,845 564,326 154,765 236,260

on mkt buy

5.22

AUD

ORD

55,129

55,129

BlackRock Investment Management (UK) on mkt buy Limited BlackRock Investment Management, LLC on mkt buy

5.22

AUD

ORD

87,724

87,724

5.22

AUD

ORD

115,135

115,135

BlackRock Investment Management (UK) Limited BlackRock Investment Management (UK) Limited BlackRock Investment Management (UK) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Fund Advisors BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Fund Advisors BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (UK) Limited BlackRock Investment Management (Australia) Limited BlackRock Fund Advisors BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Fund Advisors BlackRock Fund Advisors BlackRock Investment Management (Australia) Limited

on mkt buy

5.22

AUD

ORD

232,059

232,059

on mkt buy

5.22

AUD

ORD

602,905

602,905

on mkt buy

5.22

AUD

ORD

39,521

39,521

on mkt buy

5.27

AUD

ORD

7,842

7,842

on mkt buy

5.27

AUD

ORD

26,140

26,140

in specie on mkt sell

n/a 5.34

AUD AUD

ORD ORD

38,592 -7,842

38,592 -7,842

on mkt sell

5.34

AUD

ORD

-6,383

-6,383

in specie on mkt buy

n/a 5.39

AUD AUD

ORD ORD

4,464 1,964

4,464 1,964

on mkt buy

5.34

AUD

ORD

1,964

1,964

on mkt buy

5.34

AUD

ORD

1,587

1,587

on mkt buy

5.36

AUD

ORD

12,275

12,275

on mkt buy

5.36

AUD

ORD

1,964

1,964

on mkt sell

5.36

AUD

ORD

-23,428

-23,428

on mkt buy

5.39

AUD

ORD

1,473

1,473

in specie on mkt buy

n/a 5.29

AUD AUD

ORD ORD

51,456 1,587

51,456 1,587

on mkt buy

5.29

AUD

ORD

6,874

6,874

in specie in specie on mkt buy

n/a n/a 5.29

AUD AUD AUD

ORD ORD ORD

51,456 38,592 1,473

51,456 38,592 1,473

Person whose relevant interest changed BlackRock Fund Advisors BlackRock Fund Advisors BlackRock Investment Management (Australia) Limited BlackRock Advisors, LLC BlackRock Institutional Trust Company, National Association BlackRock Investment Management (UK) Limited BlackRock Investment Management (UK) Limited BlackRock Advisors, LLC BlackRock Advisors, LLC BlackRock Fund Advisors BlackRock Institutional Trust Company, National Association BlackRock Financial Management, Inc.

Class and number of securities affected

Person's votes affected

page 1 of 3

Date of Change 17-Sep-26 17-Sep-26 17-Sep-26 18-Sep-26 18-Sep-26 21-Sep-26 22-Sep-26 22-Sep-26 22-Sep-26 24-Sep-26 24-Sep-26 25-Sep-26 25-Sep-26 28-Sep-26 29-Sep-26 29-Sep-26 29-Sep-26 30-Sep-26 30-Sep-26 30-Sep-26 30-Sep-26 01-Oct-26 01-Oct-26 01-Oct-26 01-Oct-26 01-Oct-26 02-Oct-26 02-Oct-26 02-Oct-26 02-Oct-26 02-Oct-26 05-Oct-26 05-Oct-26 05-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 DBI

Nature of change (6) / Consideration given in relation to change (7)

CCY

BlackRock Fund Advisors BlackRock Investment Management (Australia) Limited BlackRock Fund Advisors BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (UK) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Fund Advisors BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Fund Advisors BlackRock Fund Advisors BlackRock Investment Management, LLC

in specie on mkt buy

n/a 5.37

AUD AUD

ORD ORD

64,410 5,401

64,410 5,401

on mkt buy on mkt buy

5.37 5.42

AUD AUD

ORD ORD

29,029 1,964

29,029 1,964

on mkt sell

5.42

AUD

ORD

-8,686

-8,686

on mkt sell

5.36

AUD

ORD

-5,040

-5,040

on mkt buy

5.43

AUD

ORD

1,587

1,587

on mkt buy

5.43

AUD

ORD

2,946

2,946

on mkt buy

5.43

AUD

ORD

3,928

3,928

on mkt sell

5.44

AUD

ORD

-78,488

-78,488

on mkt buy

5.45

AUD

ORD

2,946

2,946

on mkt buy

5.45

AUD

ORD

1,964

1,964

on mkt buy

5.45

AUD

ORD

7,311

7,311

on mkt buy

5.42

AUD

ORD

2,455

2,455

in specie on mkt buy

n/a 5.39

AUD AUD

ORD ORD

38,646 3,437

38,646 3,437

on mkt buy

5.39

AUD

ORD

2,946

2,946

in specie on mkt buy on mkt buy

n/a 5.60 5.60

AUD AUD AUD

ORD ORD ORD

180,960 1,698,805 8,632

180,960 1,698,805 8,632

BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Fund Advisors BlackRock Fund Advisors BlackRock Fund Advisors BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited BlackRock Fund Advisors BlackRock Advisors, LLC BlackRock Advisors, LLC BlackRock Fund Advisors BlackRock Institutional Trust Company, National Association BlackRock Financial Management, Inc.

on mkt buy

5.60

AUD

ORD

7,365

7,365

on mkt buy

5.27

AUD

ORD

1,067

1,067

on mkt buy

5.27

AUD

ORD

11,585

11,585

on mkt buy

5.27

AUD

ORD

3,928

3,928

on mkt sell

5.27

AUD

ORD

-2,455

-2,455

on mkt buy

5.27

AUD

ORD

1,617

1,617

in specie in specie in specie on mkt buy

n/a n/a n/a 5.28

AUD AUD AUD AUD

ORD ORD ORD ORD

83,520 27,840 41,760 2,455

83,520 27,840 41,760 2,455

on mkt sell

5.28

AUD

ORD

-5,040

-5,040

on mkt buy

5.33

AUD

ORD

2,455

2,455

on mkt buy

5.33

AUD

ORD

1,964

1,964

on mkt buy on mkt buy on mkt buy on mkt buy on mkt buy

5.33 5.51 5.51 5.51 5.51

AUD AUD AUD AUD AUD

ORD ORD ORD ORD ORD

27,400 2,457 60,736 16,859 34,504

27,400 2,457 60,736 16,859 34,504

on mkt buy

5.51

AUD

ORD

5,912

5,912

BlackRock Investment Management (UK) on mkt buy Limited BlackRock Investment Management, LLC on mkt buy

5.51

AUD

ORD

11,241

11,241

5.51

AUD

ORD

16,943

16,943

BlackRock Investment Management (UK) on mkt buy Limited BlackRock Investment Management (UK) on mkt buy Limited BlackRock Advisors, LLC on mkt buy

5.51

AUD

ORD

25,859

25,859

5.51

AUD

ORD

73,479

73,479

5.49

AUD

ORD

2,973

2,973

Person whose relevant interest changed

Class and number of securities affected

Person's votes affected

page 2 of 3

Date of Change 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26 07-Oct-26

DBI

Nature of change (6) / Consideration given in relation to change (7)

CCY

on mkt buy on mkt buy on mkt buy

5.49 5.49 5.49

AUD AUD AUD

ORD ORD ORD

73,474 20,395 41,740

73,474 20,395 41,740

on mkt buy

5.49

AUD

ORD

7,153

7,153

BlackRock Investment Management (UK) on mkt buy Limited BlackRock Investment Management, LLC on mkt buy

5.49

AUD

ORD

13,598

13,598

5.49

AUD

ORD

20,496

20,496

BlackRock Investment Management (UK) Limited BlackRock Investment Management (UK) Limited BlackRock Investment Management (Australia) Limited BlackRock Investment Management (Australia) Limited

on mkt buy

5.49

AUD

ORD

31,282

31,282

on mkt buy

5.49

AUD

ORD

88,889

88,889

on mkt buy

5.52

AUD

ORD

1,964

1,964

on mkt sell

5.52

AUD

ORD

-7,659

-7,659

Person whose relevant interest changed BlackRock Advisors, LLC BlackRock Fund Advisors BlackRock Institutional Trust Company, National Association BlackRock Financial Management, Inc.

Class and number of securities affected

Person's votes affected

page 3 of 3

Annexure B

This is Annexure B of 1 page referred to in form 604 Notice of change of interests of substantial shareholder

09-Oct-26 Date

Audrey Bassett, Authorised Signatory

  1. Details of present registered holders

Holder of Relevant Interests

Registered Holder of Securities

BlackRock Advisors, LLC

JPM-JP MORGAN CHASE

  • NEW YORK

BlackRock Financial Management, Inc.

BNYM-BONY LUXEMBOURG

BlackRock Fund Advisors

CITI-CITIBANK - NEW YORK

BlackRock Fund Advisors

SSB-STATE STREET SACRAMENTO

BlackRock Institutional Trust Company, National Association

JPM-JP MORGAN CHASE

  • NEW YORK

BlackRock Investment Management (Australia) Limited

BNP-BNP PARIBAS AUSTRALIA - COGENT

BlackRock Investment Management (Australia) Limited

JPM-JPM CHASE SYDNEY

BlackRock Investment Management (Australia) Limited

Northern Trust Singapore

BlackRock Investment BNYM-BONY Management (UK) Limited LUXEMBOURG

BlackRock Investment NT-NORTHERN TRUST Management (UK) Limited UK

BlackRock Investment Management, LLC

DBI

JPM-JPM CHASE SYDNEY

Person entitled to be registered as holder (8)

Nature of Relevant Interest (6) Power to control the exercise of a right to vote attached to securities and/or the power to dispose of securities held in its capacity as investment manager, reponsible entity or trustee. Power to control the exercise of a right to vote attached to securities and/or the power to dispose of securities held in its capacity as investment manager, reponsible entity or trustee. Power to control the exercise of a right to vote attached to securities and/or the power to dispose of securities held in its capacity as investment manager, reponsible entity or trustee. Power to control the exercise of a right to vote attached to securities and/or the power to dispose of securities held in its capacity as investment manager, reponsible entity or trustee. Power to control the exercise of a right to vote attached to securities and/or the power to dispose of securities held in its capacity as investment manager, reponsible entity or trustee. Power to control the exercise of a right to vote attached to securities and/or the power to dispose of securities held in its capacity as investment manager, reponsible entity or trustee. Power to control the exercise of a right to vote attached to securities and/or the power to dispose of securities held in its capacity as investment manager, reponsible entity or trustee. Power to control the exercise of a right to vote attached to securities and/or the power to dispose of securities held in its capacity as investment manager, reponsible entity or trustee. Power to control the exercise of a right to vote attached to securities and/or the power to dispose of securities held in its capacity as investment manager, reponsible entity or trustee. Power to control the exercise of a right to vote attached to securities and/or the power to dispose of securities held in its capacity as investment manager, reponsible entity or trustee. Power to control the exercise of a right to vote attached to securities and/or the power to dispose of securities held in its capacity as investment manager, reponsible entity or trustee.

Class and number of Securities

Person's votes

Nature of Association

ORD

727,112

727,112

Subsidiary of BlackRock, Inc.

ORD

68,194

68,194

Subsidiary of BlackRock, Inc.

ORD

23,811,449

23,811,449

Subsidiary of BlackRock, Inc.

ORD

196,483

196,483

Subsidiary of BlackRock, Inc.

ORD

312,752

312,752

Subsidiary of BlackRock, Inc.

ORD

12,652

12,652

Subsidiary of BlackRock, Inc.

ORD

3,510,143

3,510,143

Subsidiary of BlackRock, Inc.

ORD

26,326

26,326

Subsidiary of BlackRock, Inc.

ORD

418,104

418,104

Subsidiary of BlackRock, Inc.

ORD

687,106

687,106

Subsidiary of BlackRock, Inc.

ORD

161,206

161,206

Subsidiary of BlackRock, Inc.

page 1 of 1

Annexure C This is Annexure C of 1 page referred to in form 604 Notice of change of interests of substantial shareholder

09-Oct-26 Date

Audrey Bassett, Authorised Signatory

  1. Addresses The addresses of persons named in this form are as follows:

Name

Address

BlackRock Group BlackRock Inc. BlackRock Advisors, LLC BlackRock Financial Management, Inc. BlackRock Fund Advisors

BlackRock Institutional Trust Company, National Association BlackRock Investment Management (Australia) Limited

BlackRock Investment Management (UK) Limited

BlackRock Investment Management, LLC

DBI

50 Hudson Yards New York, NY 10001 USA 251 Little Falls Dr Wilmington, DE 19808-1674 251 Little Falls Dr Wilmington, DE 19808-1674 400 Howard Street San Francisco, CA, 94105 United States 1225 17th Street, Suite 300, Denver, CO 80202 (Colorado, USA) Level 12, 33 Alfred Street, Sydney NSW 2000 Australia 12 Throgmorton Avenue London EC2N 2DL United Kingdom 251 Little Falls Dr Wilmington, DE 19808-1674

page 1 of 1

Prompts

Dalrymple Bay Infrastructure Limited (ticker DBI), listed in Australia.

ETFs Holding Dalrymple Bay Infrastructure Limited

ETF Weight in ETF Shares Market value As of
DFIS 0.06% 850,647 $ 3.261M Nov 12, 2026
DFSI 0.02% 70,732 $ 271.188K Nov 12, 2026
DFIC 0.01% 383,208 $ 1.469M Nov 12, 2026
DFAI 0.01% 342,913 $ 1.315M Nov 12, 2026
DFAX 0.01% 189,209 $ 725.432K Nov 12, 2026