Catalyst Metals Limited is an Australian gold producer focused on the exploration, development, and production of gold. The company operates the Plutonic Gold Belt in Western Australia, a hub-and-spoke mining complex comprising multiple mines including Plutonic Main, Plutonic East, Keillor (formerly K2), and Trident, which feed a central processing plant. Additional assets include the Old Highway and Cinnamon mines in Western Australia, as well as the Bendigo Gold Project and Four Eagles Project in Victoria. The company engages in mineral exploration, mine development, and gold production, with a strategy to expand reserves and production capacity through new mine developments and infrastructure investment. Summarised from the company's own disclosures, fiscal year ended Jun 2026 |
Industry Materials | Homepage catalystmetals.com.au |
| Sector Basic Materials | IR page catalystmetals.com.au/investor-dashboard | |
|
Tags
gold mining, mineral exploration, underground mining, open pit mining, gold processing, mine development, resource delineation, Plutonic Gold Belt, Plutonic Main, Plutonic East, Keillor, K2, Trident, Old Highway, Cinnamon, Bendigo Gold Project, Four Eagles Project, Iris Zone
|
Press page — |
Metrics
| Valuation | |
|---|---|
| Market cap | A$ 1.151B |
| Market cap (USD) | $ 780.971M |
| P/E | 6.73 |
| PEG | — |
| P/BV | 0.07 |
| P/S | 1.82 |
| P/OCF | 4.15 |
| P/FCF | — |
| Dividend yield | — |
| Turnover / mcap | — |
| Returns | |
|---|---|
| ROE | 29.2% |
| ROI | 23.6% |
| ROIC | 23.6% |
| Profit margin | 27.1% |
| Growth | |
|---|---|
| Revenue growing | Yes |
| Profits growing | Yes |
| Revenue up 3y | Yes |
| Revenue up 5y | Yes |
| Earnings growth 3y (net profit CAGR) | — |
| Quality | |
|---|---|
| Profitable | Yes |
| Margin expanding | No |
| Buying back stock | No |
| Diluting (TTM) | Yes |
| Debt/Equity | 3.5% |
| Podcast bulls (TTM) | Sign up |
| Podcast bears (TTM) | Sign up |
| Podcast sentiment (TTM) | Sign up |
| Podcast sentiment % (TTM) | Sign up |
| News sentiment (TTM) | 0 |
| Quality score | 64.7% |
| Insiders | |
|---|---|
| Buys, 1w | Sign up |
| Buys, 1m | Sign up |
| Buys, 1y | Sign up |
| Sells, 1w | Sign up |
| Sells, 1m | Sign up |
| Sells, 1y | Sign up |
| Figure | FY 2026 | FY 2025 | FY 2024 | FY 2023 | FY 2022 | FY 2021 | FY 2020 | FY 2019 | FY 2018 | FY 2017 | FY 2016 | FY 2015 | FY 2014 | FY 2013 | FY 2012 | FY 2011 | FY 2010 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenue | 631.938M | 361.412M | 241.951M | 63.944M | 63.33M | 28.509M | 0 | — | 191.224K | 119.405K | 17.746K | 708.859K | 32.094K | 55.946K | 100.29K | 113.378K | 71.545K |
| Net profit | 171.12M | 119.272M | — | — | — | — | — | — | — | — | — | — | — | -1.007M | -3.507M | -1.277M | -223.171K |
Podcast Mentions
Announcements lodged with ASX, newest first, routine forms (director and substantial-holding notices, daily buy-back and quotation notices) included. The link opens the announcement on ASX. Press releases from the company's own website, newest first.
ASX Announcement 30 October 2026
Catalyst Metals’ flagship asset is the 40km long Plutonic Gold Belt in Western Australia. This belt currently produces ~100koz pa at an AISC of ±A$2,800/oz from three mines at Plutonic Main, Plutonic East and Keillor. Catalyst is currently bringing three new mines into production - Trident UG, Cinnamon & Old Highway. Each will be processed through the existing, underutilised and centrally located 2Mtpa CIL processing plant. Exploration is targeting down dip extensions of each of these deposits. With the development and exploration of these six deposits, Catalyst aims to increase production from ±100koz to ±200koz annually. In so doing, Catalyst is aiming for Plutonic to have a 10 year mine life - a unique and rare proposition for an underground Western Australian gold mine. Catalyst also controls a processing plant and +75km of strike length immediately north of the historic +22Moz Bendigo goldfield. Here, Catalyst has delineated a high-grade, greenfield resource at 26 g/t Au. Further discoveries along strike are targeted. Capital Structure Shares o/s: 264.0m Options: 0.1m Rights: 9.5m Cash & Bullion: A$371m Debt: Nil Reserve and Resource1 MRE: 5.1Moz at 3.2g/t Au ORE: 2.0Moz at 2.6g/t Au
September 2026 Quarterly Report Quarterly Highlights
• TRIFR falls from ten to seven. Calendar year-to-date has fallen below six as a better understanding of operating across the full length of the belt develops
• Gold sold was 27,229oz at an AISC of A$3,512/oz, with production of 22,231oz • Production was impacted by lower staffing levels • A$40m cash build for the quarter after all operating, corporate, capital and exploration costs
• Plutonic Belt Reserves increased to 2Moz, supporting ±200koz pa for ±10-years • Reserve growth of 1.8Moz under Catalyst’s three-year ownership at a cost of A$125/oz • Revolving credit facility increased from A$100m to A$200m and extended to four years – the facility remains undrawn
Growth & Exploration
• Trident underground development continued with crews starting day and night shifts • Grade control drilling of the Old Highway open pit commenced giving encouragement of its progress towards production; grade control drilling at Cinnamon commenced post quarter end
• Drilling at Cinnamon confirmed mineralisation in parallel conglomerate units – demonstrating potential for repeat high grade zones to that of the existing Reserve
• Financial and Corporate • Operating cashflow was A$80m2. Of this, A$13m was re-invested in growth projects
(including Trident, Keillor and Baltic mine development), A$10m in non-discretionary capital and A$17m in exploration (refer figure 2) leaving a cash build of A$40m
• Cash and bullion at quarter end was A$371m, an increase of A$40m on the prior quarter • Catalyst is debt free with undrawn debt facility of A$200m and liquidity of A$571m FY27 Guidance
• Trident and Old Highway gold production has been deferred from FY27 to FY28. While
this will see a re-organisation of the nearer-term schedule, the long-term production target of ±200koz pa remains unchanged, as does the underlying 2Moz Reserve base and A$571m of liquidity that underwrites this organic expansion
• Whether the extent of this re-organisation is material is not yet clear • FY27 guidance reflects various changes within the business – namely permitting timelines
and updates to Reserve and Resources. Furthermore, with the strength of its balance sheet, Catalyst is not forced to rush production of new mines, allowing it to focus on mine development rather than production and thereby setting itself up for longer term success
Corporate Details
• Capital projects include A$40m on a works program to refurbish and debottleneck the
ASX: CYL E:investors@catalystmetals. com.au W:catalystmetals.com.au
• Exploration will be at similar levels to FY26 and target Reserve growth, mine life
processing plant (A$30m) and construct a new TSF (A$10m), with a further A$70m on new equipment (A$30m) and Trident mine development (A$40m) extensions and regional, early-stage exploration
` Note 1: MRE includes Indicated Resources of 38.6Mt at 3.3g/t for 4.1Moz and Inferred Resources of 10.9Mt at 3.0g/t for 1.1Moz. ORE includes probable Reserves of 23.4Mt at 2.6g/t for 2.0Moz. Refer to ASX announcement 21 October 2026 “Annual Report to shareholders”. Note 2: Operating cashflow is after sustaining capital, corporate costs and working capital movements
1
- FY27 GUIDANCE Catalyst consolidated the Plutonic Belt in July 2023 with the objective of transforming the scale, operating performance and long-term growth potential of the operation. Effecting this plan, over the following two years, Catalyst transformed its business – turning around Plutonic’s operations around, acquiring an asset, selling an asset and securing A$250m in capital to fortify its balance sheet. By September 2025, due to the extent of the changes to the Plutonic Belt, Catalyst sought to provide investors with an indication of the Belt’s longer-term potential and released 10-year guidance. As with any long-term guidance for an underground mine, it is general in nature. Since then, the team continued to refine its understanding of the projects along the Plutonic Gold Belt and develop a more detailed nearer term production plan. This work included: delineating a 2Moz Reserve, grade control drilling leading to a more detailed understanding of Trident, Cinnamon discovery, Old Highway and Cinnamon permitting timelines, and an improved understanding of the Plutonic processing plant’s operating performance and potential throughput capacity. This led to Catalyst communicating to investors in July 2026 that adjustments to the September 2025 general guidance were anticipated. The September 2025 guidance suggested annual production in FY27 of 130koz to 150koz. This included within it, production from Old Highway and Trident. Since then, a number of factors have seen a change to FY27. These include: • •
Delays to Old Highway’s permitting pushing estimated production into the next financial year; and Trident’s delayed underground start and slower development ramp up. Further, while grade control drilling increased the overall grade contained within the Trident Resource, the drilling did not deliver the same improvements at the extremities of the deposit. This reinforces the importance of undertaking detailed grade control drilling and mine planning ahead of production.
Beyond FY27, internal strategic decisions have resulted in a change to the development approach of new mines. These decisions are made possible because of Catalyst’s balance sheet. It allows the Company to prioritise detailed mine development over accelerating production to meet previously indicated timelines. Accordingly, Catalyst has adopted a measured approach to the development of its underground deposits, in particular prioritising mine development over production so as to adequately separate development and production work areas. Management considers this approach to be in the best long-term interests of the Company and its shareholders, notwithstanding the impact on nearer-term production expectations. While Catalyst sees no material change to the underlying Reserves and its ±200koz production vision, it sees a deferral of Trident and Old Highway’s FY27 production into FY28 for the reasons outlined above and a reorganisation of the organic growth to 200koz. Whether the extent of this re-organisation is material is not yet clear. Work is ongoing to further understand the nearer-term production schedule. The Company does not expect gold production for FY27 to be linear from quarter to quarter. Gold production will vary throughout the year as management deal with mine plan variability and day-to-day operational challenges. Furthermore, expenditure will vary during the year depending on the availability of contractors, lead times on orders and timeliness on the completion of capital projects.
ASX:CYL
catalystmetals.com.au
2
Table 1: FY27 Guidance FY27 Guidance Production All-in Sustaining Cost (AISC)
Unit Koz A$/oz
Range 90 4,100
105 3,600
Non-Discretionary, Non-Recurring Capex Processing TSF Total Non-Discretionary Capex
A$m A$m A$m
22 8 30
30 10 40
Discretionary Growth Capex Growth Capex - Equipment Growth Capex - Trident Growth – Other Total Growth Capex
A$m A$m A$m A$m
25 38 7 70
30 42 8 80
Discretionary Exploration Capex Exploration
A$m
80
90
PRODUCTION ACTIVITIES AND COSTS Ore sources for the year will be from Plutonic Main, Plutonic East and Keillor and the small remainder of the Trident Open Pit stockpiles. Plutonic Complex (includes Plutonic Main and Plutonic East) Plutonic Main continues to provide the largest baseload feed for the processing plant and in so doing forms an important part of the Plutonic Belt’s business. When paired with other satellite ore sources, the combined effect increases profitability through economies of scale and allows for more consistent production. Management aims to improve on the amount of ore sourced from Plutonic Main above that produced in the September quarter as staff vacancy rates and chartered flights return to normal. Marymia Complex (includes Keillor and Trident Open Pit) Commercial production has been declared at Keillor despite several teething issues remaining around power, communications and internal reporting. Despite these ongoing projects/issues, management aims to continue sourcing ore from Keillor in a similar manner as the September quarter. A few production challenges remain for the year in the extraction of the higher-grade crown pillar. Trucking of low-grade ore from Trident open pit stockpiles will likely be complete in CY26 with ~63kt processed during the September quarter. Trident Production is not expected from Trident this financial year. Previously anticipated production has not eventuated due to the following:
- grade control drilling completed earlier this calendar year led to improvements in the deposits overall grade and ounces but not on the fringes or earliest parts of the deposit that were scheduled to be mined. Rather these areas narrowed and reduced potential production. So, while grade control developments were positive, they did push out previously anticipated production targets; and
- the underground portal commencement was delayed by a month. Subsequent development was slower than expected leading to the current position being 100m behind the anticipated development schedule. Early signs of increased development rates are occurring following a change in Trident’s bonus structure and site management, with management hoping to make up for lost time.
ASX:CYL
catalystmetals.com.au
3
Old Highway Production is not expected from Old Highway this financial year. Any previously anticipated production has not eventuated due to delays in permitting. Catalyst expects mining activities to commence in CY27. In preparation for this, Catalyst will complete the grade control drilling for two of the five open pits this coming quarter. It has also selected the civil works contractor for the Great Northern Highway road siding, and the mining contractor selection process has moved to preferred contractor status readying for contract finalisation and site mobilisation. Each of these steps give further encouragement of production commencing at Old Highway. Cinnamon Production is not expected from Cinnamon this financial year. Management would like to commence initial site works and surface activities in CY27. Costs The higher guidance for AISC in FY27, relative to FY26, is a reflection of three factors: 1) lower production rates across existing mines (i.e. the fixed cost base of Plutonic being allocated across fewer ounces); 2) inflation that has occurred across the industry since the prior year; and 3) maintaining cost discipline during a period of rapid growth in an inflationary environment. Capital expenditure is explained below. PROJECT DEVELOPMENT (A$70m to A$80m) Management aim to spend between A$70m to A$80m in the area of Project Development over FY27. This work program includes: ±A$40m developing Trident’s underground decline (largely capitalised operating costs such as salaries & wages, contractors, ground support and other consumables), ±A$30m on equipment and fleet, and ±A$8m on other small ancillary growth projects including Baltic. Management may choose to increase or decrease capital expenditure during this period should they deem it a more sensible decision in managing the business. NON-DISCRETIONARY CAPITAL (A$30m to A$40m) Non-discretionary capital represents one-off capital expenditure to support the life of mine plan. Catalyst considers that this category is non-recurring and will become less material in the future as major infrastructure refurbishment is completed. In FY27, non-discretionary capital will comprise refurbishment and debottlenecking of the processing plant, and construction of the new tailings storage facility’s starter embankment (providing an initial two years capacity). A A$1.6m TSF lift on the currently operational TSF 3 is also to occur in FY27. TSF lift costs are included with in the All-In Sustaining Costs. Further discussion of projects underway to improve processing plant throughput and reliability are discussed at section 3.5. EXPLORATION (A$80m to A$90m) Exploration will be at similar levels to prior years and continue across three programs: • • •
Reserve conversion of inferred material at Cinnamon and Trident; Resource extension targeting growth at Cinnamon, Keillor, Old Highway and Plutonic Main; and Regional exploration to test new exploration targets.
Due to Catalyst’s considerable spend on exploration over the last two years – totalling ~A$130m - it has built an exploration management system that allows it to be highly flexible. This management system process allows for
ASX:CYL
catalystmetals.com.au
4
21-day turnaround on assay results, fast updates to Resource models, quick analysis and interpretation of geological results, rapid decision making on future exploration programs and high visibility on cost reporting and tracking. This management system has been critical to the Company’s delineation of 1.8Moz of gold Reserves over the last two years – when Catalyst commenced exploration activities. Two key areas of spend are Trident and Cinnamon. Infill programs at Trident and Cinnamon will target conversion of the existing inferred Resources (448koz at 4.6g/t Au and 105koz at 3.3g/t Au respectively). To date, increased drilling density has seen a conversion of 75% of inferred to indicated, at improved grades. This was noted with both Resource conversion and grade control drilling. Resource growth programs at Cinnamon will target areas above, adjacent to and beneath the existing high-grade zone, where FY26 drilling identified mineralisation. Beyond this, drilling is expected to improve the understanding of mineralisation at Baltic (Plutonic Main’s extension), Keillor and Old Highway. Catalyst is also undertaking broader exploration along the Cinnamon trend and other regional prospects to continue filling the exploration pipeline.
ASX:CYL
catalystmetals.com.au
5
- OPERATIONS OVERVIEW - OPERATIONS 2.1 Safety Plutonic’s TRIFR reduced to 7 at 30 September. No reportable injuries were recorded during the quarter. Plutonic’s operational workforce, including contractors has expanded rapidly as new mines are being developed and capital works progressed. A reinvigorated focus on safety standards and proactive safety measures by site management resulted in an improved safety outcome for the September quarter. Catalyst remains committed to achieving a zero-harm workplace and continues to invest in training to support safe growth.
Figure 1: Plutonic 12-month TRIFR and reportable injuries
2.2 Operations In the September 2026 quarter, Plutonic produced 22,231oz of gold at an AISC of A$4,267/oz (prior quarter 31,886oz produced at A$2,666/oz). Multiple mines across the Plutonic Gold Belt continue to deliver ore to the central processing plant: Plutonic Main, Plutonic East and Keillor. Stockpiled Trident Open Pit ore will continue to be processed over the remainder of the CY26 year albeit its contributions continue to reduce as stockpiles are diminished. Production for the quarter was hampered primarily by low staffing levels. An extended processing plant shut down period, for the purpose of improving long term throughput rates, also had an impact – see processing section below. Lower staffing levels arose for several reasons including a material change in flight times causing considerable disruption to the workforce and an increasingly competitive labour market in Western Australia. The consequence of these events were lower material movements across Plutonic East and Main and with their inherent fixed costs base, unit costs rose. Significant steps were taken during the quarter to address these issues with the establishment of a new internal recruitment function, staff performance monitoring and securing of new and more appropriate FIFO flight times. The results of these steps have been positive with vacancies being filled and production numbers returning to a more appropriate level.
ASX:CYL
catalystmetals.com.au
6
2.3 Cashflows from business activities During the quarter, Catalyst generated A$80m cash from operations (after corporate costs, tax and working capital movements), with an average realised gold price of A$6,116/oz. From this, A$10m of non-discretionary capital was invested (primarily on upgrades to the processing plant), a further $13m was spent on discretionary growth capital and then a further A$17m on exploration.
Figure 2: Quarterly group cashflow waterfall 1
At 30 September 2026, the Company had available liquidity of A$571m, comprising cash and bullion of A$371m and an undrawn corporate revolving facility of A$200m. The corporate revolving facility was increased during the quarter from A$100m to A$200m and tenor extended to four years.
- PROJECT DEVELOPMENT – PLUTONIC GOLD BELT In Plutonic, Catalyst sees a long-term, sustainable production rate of scale. Underwriting this is Catalyst’s 2Moz Reserve base and existing infrastructure. This Reserve and infrastructure base are the tools to increase the production rate from ±100koz to ±200koz 2. The six ore sources to achieve this production rate are Plutonic Main, Plutonic East, Trident, Keillor, Old Highway, and Cinnamon. All lie within 40km of the currently underutilised and centrally located Plutonic processing plant. In FY26, Catalyst focused on the Plutonic East ramp up, development of Keillor (formerly K2) and completion of the Trident Open Pit. With three mines now in commercial production (Plutonic Main, Plutonic East and Keillor), FY27 focus turns to establishing the Trident Underground, and Old Highway and Cinnamon Open Pits. A summary of the project development activities for the quarter is below.
1
Totals may not add due to rounding
2 ASX announcement 10 September 2025 “Plutonic Belt Reserves double, supporting long term growth plans” and “Investor Presentation”
ASX:CYL
catalystmetals.com.au
7
3.1 Trident Gold Project 1.1Moz, high-grade underground Resource. Underground development progressing. Trident is located 30km north-east of the underutilised Plutonic processing plant. The underground decline is currently being developed to allow mining to commence in CY27. Trident’s Resources sits at 1.1Moz at 5.4 g/t Au and a Reserve of 524koz at 4.2g/t Au. Mine life beyond this would include the Trident 448koz Inferred Resource 3. Trident’s inferred Resources have historically converted to Reserves at approximately 75%. The development of the Trident underground contemplated a small open pit above the underground orebody, acting as the boxcut/portal. Catalyst completed mining of this small open pit during CY26 and has commenced construction of the underground portal and decline. Development rates have been slower than desired. With the single heading, rates have advanced approximately ±100m per month. Slower development early in the mine’s establishment is not uncommon given the more oxidised material closer to the surface, single heading nature of the mine and employees familiarising themselves with the new area. More headings are expected to open in the coming months with development rates expected to improve. To date, varying ground conditions have been experienced with different ground support techniques used to address this. These experiences give encouragement as to how the mine will perform in the future. 3.2 Keillor (formerly K2) Commercial production achieved; mine life extended through Reserve growth Keillor is situated 40km north-east of the Plutonic processing plant. Keillor is currently in operation and has an underground Reserve of 101koz at 3.8g/t Au 4. During the quarter Catalyst released an updated Resource of 307koz at 3.0g/t (including an underground Resource of 285koz at 3.3g/t Au) 5. This was a 280% increase on previous Resources and reflects the lack of drilling undertaken since the late 1990’s, owing to the fragmented ownership of the area. Further drilling at Keillor will focus on Resource extension and conversion of the 98koz of inferred Resources into indicated and ultimately Reserves. Mining at Keillor commenced in FY26 and has achieved commercial production. Grade control drilling of the first years’ production has been completed. 3.3 Old Highway Gold Project Open pit grade control drilling well underway; development expected to commence CY27 Old Highway is an undeveloped gold project located 40km south of the Plutonic processing plant, along the Great Northern Highway. It sits on existing mining leases and has a Resource (underground and open pit) of 313koz at 2.4 g/t Au, including a higher-grade underground component of 186koz at 4.1 g/t Au. A Reserve of 155koz at 2.6 g/t Au 6 underpins a five-year mine-life at annual steady state gold production of ±35kozpa. Further exploration drilling in FY27 aims at increasing Old Highway’s mine life from five to eight years. Old Highway will be the fifth mine to be developed along the Belt and will follow a similar development plan to Trident – an initial small open pit followed by a high-grade underground mine. 3
ASX Announcements 23 June 2026 'Trident Resource grows to 1.1Moz at 5.4 g/t’ and 14 September 2026 ‘Trident Reserves grow by 30%’
4 ASX Announcement 29 September 2026 ‘Catalyst grows Reserves to 2Moz across the Plutonic Belt’ 5 ASX Announcement 9 September 2026 ‘Keillor (formerly K2) Resource grows by 280%’ 6
ASX announcement 29 September 2026 “Catalyst grows Reserves to 2Moz across the Plutonic Belt”
ASX:CYL
catalystmetals.com.au
8
Permitting workstreams continued during the quarter. Considerable work with Traditional Owners has taken place over the last 18 months including multiple surveys and site visits. Catalyst is in the final stages of the Mining Development and Closure Plan (MDCP) process and the Native Vegetation Clearing Permit (NVCP) is expected to be permitted by the end of the year. Other permits and licenses are ongoing, although these are not an impediment to commencement of initial mining. A new Great Northern Highway intersection is required to accommodate ore haulage to the Plutonic processing plant. Final designs have been submitted to Main Roads with approval expected late CY26. Tenders for the civil works relating to the road siding were completed with a preferred contractor selected. Grade control drilling of the Old Highway open pit commenced during the quarter. Five open pits are planned over Old Highway’s mine life. The tender for the open pit mining contractor progressed substantially with the Company seeking to move to preferred tender and contract finalisation in the near future. While development of Old Highway has incurred permitting delays, progress on grade control programs, the tender process for open pit mining contractor and ongoing engagement with Traditional Owners and government agencies provide management with confidence that development of Old Highway can commence in CY27. 3.4 Cinnamon Maiden underground Reserve defined; Exploration drilling continues; Permitting advances with mining commencement targeted for CY27 Cinnamon is an undeveloped gold deposit located ±25km from the Plutonic processing plant. It holds a strike length of +10km running at the centre of the Plutonic Belt and parallel to Trident. It is hosted by an entirely different host rock than Trident and those deposits found elsewhere on the Plutonic Belt. It is an exciting new discovery that occurred in late 2025. The Cinnamon Resource stands at 541koz at 2.5g/t Au, including a higher-grade underground Resource of 434koz at 3.4g/t Au. The overall Reserve for the open pit and underground stands at 320koz at 2.3 g/t Au underpinning a mine life comprising approximately two years of open pit followed by seven-year underground mine-life at annual steady underground state of ±40kozpa of gold production 7. Baseline surveys continued during the September quarter. These will support future approvals required for Cinnamon’s development. No critical impediments were identified and the MDCP and NVCP are expected to be submitted by the end of CY2026. Discussions for the appointment of the open pit mining contractor have been progressed in parallel to the Old Highway Open Pit development. Cinnamon is a larger and different open pit than Old Highway and hence consideration needs to be given as to how to mine the two sequentially. Grade control drilling of the Cinnamon open pit is due to commence this quarter. One large open pit is planned over Cinnamon’s mine life with an underground mine being established within the pit. While Catalyst cannot be certain when Cinnamon ores will be processed at Plutonic, the commencement of grade control programs, progression of open pit mining contractor tenders and ongoing engagement with Traditional Owner groups and government agencies provides management confidence that activities at Cinnamon could commence in CY27.
7 ASX Announcement 21 September 2026 ‘ Cinnamon Resource grows 370%, maiden underground Reserve
ASX:CYL
catalystmetals.com.au
9
3.5 Processing plant improvements Catalyst is targeting an annual throughput rate of 2Mtpa from the centrally located processing plant (PP1). A capital works program is underway and will continue through FY27 aimed at increasing the reliability and throughput of the PP1 plant. This program includes installation of a new crushing circuit (complete), upgrade to the elution circuit, new tails thickener, tails screen and pumps, control system and various structural improvements and conveyor belt upgrades. FY27 activities The activities over the last three years led to a works program being designed for FY27. The program spans 29 projects costing ±A$30m. Some of these projects relate to throughput, some to rehabilitation of old structural works, and some to improved management, or modernisation, of the plant. Catalyst, like others, has adopted the operating philosophy that the mill should be the site’s bottleneck. That is not currently the case and this gives our team encouragement that the processing target of 2Mtpa and beyond is achievable after various projects are completed. The focus within the business is to take the time in FY27 to set up the processing plant up for the long term, making up for years of underinvestment. In parallel to this, we work with our operating team to continually lift performance to new daily maximums, tighten up shut times and improve day-to-day maintenance procedures. This approach, we believe, will put us in good stead to cater for the excess ore to be delivered over the coming years. 3.6 Tailings storage facility (TSF) A fourth and fifth cell (TSF 4/5) at the existing tailings storage facility has been approved, cleared and readied for construction to commence in December. TSF 4/5 will provide +10 years of storage capacity. The starter embankment (Stage 1) will cost ~A$7m and provide capacity for the next two years. Simultaneously to this, we are lifting the currently operational TSF three for another year’s worth of capacity each.
Figure 3: Aerial image of Plutonic site, showing existing TSF cells and cleared area for construction of TSF 4/5
ASX:CYL
catalystmetals.com.au
10
- EXPLORATION 4.1 Plutonic Belt Exploration During the quarter, Catalyst announced that Reserves across the Plutonic Belt had grown approximately 35%
Rules 4.7.3 and 4.10.3
Appendix 4G Key to Disclosures
Corporate Governance Council Principles and Recommendations Name of entity
Catalyst Metals Limited ABN/ARBN
Financial year ended:
54 118 912 495
30 June 2026
Our corporate governance statement 1 for the period above can be found at: 2
☐
These pages of our annual report:
☒
This URL on our website:
https://catalystmetals.com.au/about-catalyst/corporategovernance/
The Corporate Governance Statement is accurate and up to date as at 21 October 2026 and has been approved by the board. The annexure includes a key to where our corporate governance disclosures can be located. 3 Date:
21 October 2026
Name of authorised officer authorising lodgement:
Emma Wates Company Secretary
1
“Corporate governance statement” is defined in Listing Rule 19.12 to mean the statement referred to in Listing Rule 4.10.3 which discloses the extent to which an entity has followed the recommendations set by the ASX Corporate Governance Council during a particular reporting period. Listing Rule 4.10.3 requires an entity that is included in the official list as an ASX Listing to include in its annual report either a corporate governance statement that meets the requirements of that rule or the URL of the page on its website where such a statement is located. The corporate governance statement must disclose the extent to which the entity has followed the recommendations set by the ASX Corporate Governance Council during the reporting period. If the entity has not followed a recommendation for any part of the reporting period, its corporate governance statement must separately identify that recommendation and the period during which it was not followed and state its reasons for not following the recommendation and what (if any) alternative governance practices it adopted in lieu of the recommendation during that period. Under Listing Rule 4.7.4, if an entity chooses to include its corporate governance statement on its website rather than in its annual report, it must lodge a copy of the corporate governance statement with ASX at the same time as it lodges its annual report with ASX. The corporate governance statement must be current as at the effective date specified in that statement for the purposes of Listing Rule 4.10.3. Under Listing Rule 4.7.3, an entity must also lodge with ASX a completed Appendix 4G at the same time as it lodges its annual report with ASX. The Appendix 4G serves a dual purpose. It acts as a key designed to assist readers to locate the governance disclosures made by a listed entity under Listing Rule 4.10.3 and under the ASX Corporate Governance Council’s recommendations. It also acts as a verification tool for listed entities to confirm that they have met the disclosure requirements of Listing Rule 4.10.3. The Appendix 4G is not a substitute for, and is not to be confused with, the entity's corporate governance statement. They serve different purposes and an entity must produce each of them separately.
2
Tick whichever option is correct and then complete the page number(s) of the annual report, or the URL of the web page, where your corporate governance statement can be found. You can, if you wish, delete the option which is not applicable.
3
Throughout this form, where you are given two or more options to select, you can, if you wish, delete any option which is not applicable and just retain the option that is applicable. If you select an option that includes “OR” at the end of the selection and you delete the other options, you can also, if you wish, delete the “OR” at the end of the selection. See notes 4 and 5 below for further instructions on how to complete this form. ASX Listing Rules Appendix 4G (current at 17/7/2020)
Page 1
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations
ANNEXURE – KEY TO CORPORATE GOVERNANCE DISCLOSURES Corporate Governance Council recommendation
Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement:
Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
PRINCIPLE 1 – LAY SOLID FOUNDATIONS FOR MANAGEMENT AND OVERSIGHT 1.1
1.2
1.3
1.4
A listed entity should have and disclose a board charter setting out: (a) the respective roles and responsibilities of its board and management; and (b) those matters expressly reserved to the board and those delegated to management.
☒
☐
set out in our Corporate Governance Statement OR
and we have disclosed a copy of our board charter at: https://catalystmetals.com.au/about-catalyst/corporate-governance/
☐
we are an externally managed entity and this recommendation is therefore not applicable
A listed entity should: (a) undertake appropriate checks before appointing a director or senior executive or putting someone forward for election as a director; and (b) provide security holders with all material information in its possession relevant to a decision on whether or not to elect or re-elect a director.
☒
☐
set out in our Corporate Governance Statement OR
☐
we are an externally managed entity and this recommendation is therefore not applicable
A listed entity should have a written agreement with each director and senior executive setting out the terms of their appointment.
☒
☐
set out in our Corporate Governance Statement OR
☐
we are an externally managed entity and this recommendation is therefore not applicable
The company secretary of a listed entity should be accountable directly to the board, through the chair, on all matters to do with the proper functioning of the board.
☒
☐
set out in our Corporate Governance Statement OR
☐
we are an externally managed entity and this recommendation is therefore not applicable
Tick the box in this column only if you have followed the relevant recommendation in full for the whole of the period above. Where the recommendation has a disclosure obligation attached, you must insert the location where that disclosure has been made, where indicated by the line with “insert location” underneath. If the disclosure in question has been made in your corporate governance statement, you need only insert “our corporate governance statement”. If the disclosure has been made in your annual report, you should insert the page number(s) of your annual report (eg “pages 10-12 of our annual report”). If the disclosure has been made on your website, you should insert the URL of the web page where the disclosure has been made or can be accessed (eg “www.entityname.com.au/corporate governance/charters/”). 4
5
If you have followed all of the Council’s recommendations in full for the whole of the period above, you can, if you wish, delete this column from the form and re-format it.
ASX Listing Rules Appendix 4G (current at 17/7/2020)
Page 2
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Corporate Governance Council recommendation
Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement:
Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
1.5
A listed entity should: (a) have and disclose a diversity policy; (b) through its board or a committee of the board set measurable objectives for achieving gender diversity in the composition of its board, senior executives and workforce generally; and (c) disclose in relation to each reporting period: (1) the measurable objectives set for that period to achieve gender diversity; (2) the entity’s progress towards achieving those objectives; and (3) either: (A) the respective proportions of men and women on the board, in senior executive positions and across the whole workforce (including how the entity has defined “senior executive” for these purposes); or (B) if the entity is a “relevant employer” under the Workplace Gender Equality Act, the entity’s most recent “Gender Equality Indicators”, as defined in and published under that Act. If the entity was in the S&P / ASX 300 Index at the commencement of the reporting period, the measurable objective for achieving gender diversity in the composition of its board should be to have not less than 30% of its directors of each gender within a specified period.
☒
☒
(b) as set out in our Corporate Governance Statement OR
A listed entity should: (a) have and disclose a process for periodically evaluating the performance of the board, its committees and individual directors; and (b) disclose for each reporting period whether a performance evaluation has been undertaken in accordance with that process during or in respect of that period.
☒
☐
set out in our Corporate Governance Statement OR
and we have disclosed the evaluation process referred to in paragraph (a) at: https://catalystmetals.com.au/about-catalyst/corporate-governance/
☐
we are an externally managed entity and this recommendation is therefore not applicable
1.6
ASX Listing Rules Appendix 4G (current at 17/7/2020)
(a) we have disclosed a copy of our diversity policy at: https://catalystmetals.com.au/about-catalyst/corporate-governance/ (c)
we have disclosed the information referred to in paragraph (c) at: 2026 Corporate Governance Statement Measurable objectives targeting 30% of each gender on the Board have been set.
and whether a performance evaluation was undertaken for the reporting period in accordance with that process at: 2026 Corporate Governance Statement
Page 3
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Corporate Governance Council recommendation
Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement:
1.7
☒
☐
set out in our Corporate Governance Statement OR
and we have disclosed the evaluation process referred to in paragraph (a) at: https://catalystmetals.com.au/about-catalyst/corporate-governance/
☐
we are an externally managed entity and this recommendation is therefore not applicable
A listed entity should: (a) have and disclose a process for evaluating the performance of its senior executives at least once every reporting period; and (b) disclose for each reporting period whether a performance evaluation has been undertaken in accordance with that process during or in respect of that period.
ASX Listing Rules Appendix 4G (current at 17/7/2020)
Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
and whether a performance evaluation was undertaken for the reporting period in accordance with that process at: 2026 Corporate Governance Statement
Page 4
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Corporate Governance Council recommendation
Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement:
Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
PRINCIPLE 2 - STRUCTURE THE BOARD TO BE EFFECTIVE AND ADD VALUE 2.1
2.2
The board of a listed entity should: (a) have a nomination committee which: (1) has at least three members, a majority of whom are independent directors; and (2) is chaired by an independent director, and disclose: (3) the charter of the committee; (4) the members of the committee; and (5) as at the end of each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or (b) if it does not have a nomination committee, disclose that fact and the processes it employs to address board succession issues and to ensure that the board has the appropriate balance of skills, knowledge, experience, independence and diversity to enable it to discharge its duties and responsibilities effectively.
☒
A listed entity should have and disclose a board skills matrix setting out the mix of skills that the board currently has or is looking to achieve in its membership.
ASX Listing Rules Appendix 4G (current at 17/7/2020)
☒
(a) (1) set out in our Corporate Governance Statement OR
☒
☐
set out in our Corporate Governance Statement OR
and we have disclosed our board skills matrix at: 2026 Corporate Governance Statement (Annexure 1).
☐
we are an externally managed entity and this recommendation is therefore not applicable
[If the entity complies with paragraph (a):] (a) (2) the nomination and remuneration committee is chaired by an independent director (a) (3) we have disclosed a copy of the charter of the committee at: https://catalystmetals.com.au/about-catalyst/corporate-governance/ and the information referred to in paragraphs (4) and (5) at: Directors Report section of the 2026 Annual Report and 2026 Corporate Governance Statement
Page 5
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Corporate Governance Council recommendation
Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement:
Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
2.3
A listed entity should disclose: (a) the names of the directors considered by the board to be independent directors; (b) if a director has an interest, position, affiliation or relationship of the type described in Box 2.3 but the board is of the opinion that it does not compromise the independence of the director, the nature of the interest, position or relationship in question and an explanation of why the board is of that opinion; and (c) the length of service of each director.
☒
☐
set out in our Corporate Governance Statement
A majority of the board of a listed entity should be independent directors.
☐
☒
set out in our Corporate Governance Statement OR
☐
we are an externally managed entity and this recommendation is therefore not applicable
The chair of the board of a listed entity should be an independent director and, in particular, should not be the same person as the CEO of the entity.
☒
☐
set out in our Corporate Governance Statement OR
☐
we are an externally managed entity and this recommendation is therefore not applicable
A listed entity should have a program for inducting new directors and for periodically reviewing whether there is a need for existing directors to undertake professional development to maintain the skills and knowledge needed to perform their role as directors effectively.
☒
☐
set out in our Corporate Governance Statement OR
☐
we are an externally managed entity and this recommendation is therefore not applicable
☐
set out in our Corporate Governance Statement
☐
set out in our Corporate Governance Statement
2.4
2.5
2.6
and we have disclosed the names of the directors considered by the board to be independent directors at: 2026 Corporate Governance Statement and, where applicable, the information referred to in paragraph (b) at: 2026 Corporate Governance Statement and the length of service of each director at: 2026 Corporate Governance Statement
PRINCIPLE 3 – INSTIL A CULTURE OF ACTING LAWFULLY, ETHICALLY AND RESPONSIBLY 3.1
A listed entity should articulate and disclose its values.
☒ and we have disclosed our values at: https://catalystmetals.com.au/about-catalyst/corporate-governance/
3.2
A listed entity should: (a) have and disclose a code of conduct for its directors, senior executives and employees; and (b) ensure that the board or a committee of the board is informed of any material breaches of that code.
ASX Listing Rules Appendix 4G (current at 17/7/2020)
☒ and we have disclosed our code of conduct at: https://catalystmetals.com.au/about-catalyst/corporate-governance/
Page 6
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Corporate Governance Council recommendation
Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement:
Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
3.3
A listed entity should: (a) have and disclose a whistleblower policy; and (b) ensure that the board or a committee of the board is informed of any material incidents reported under that policy.
☒
☐
set out in our Corporate Governance Statement
A listed entity should: (a) have and disclose an anti-bribery and corruption policy; and (b) ensure that the board or committee of the board is informed of any material breaches of that policy.
☒
☐
set out in our Corporate Governance Statement
3.4
ASX Listing Rules Appendix 4G (current at 17/7/2020)
and we have disclosed our whistleblower policy at: https://catalystmetals.com.au/about-catalyst/corporate-governance/
and we have disclosed our anti-bribery and corruption policy at: https://catalystmetals.com.au/about-catalyst/corporate-governance/
Page 7
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Corporate Governance Council recommendation
Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement:
Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
PRINCIPLE 4 – SAFEGUARD THE INTEGRITY OF CORPORATE REPORTS 4.1
The board of a listed entity should: (a) have an audit committee which: (1) has at least three members, all of whom are nonexecutive directors and a majority of whom are independent directors; and (2) is chaired by an independent director, who is not the chair of the board, and disclose: (3) the charter of the committee; (4) the relevant qualifications and experience of the members of the committee; and (5) in relation to each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or (b) if it does not have an audit committee, disclose that fact and the processes it employs that independently verify and safeguard the integrity of its corporate reporting, including the processes for the appointment and removal of the external auditor and the rotation of the audit engagement partner.
☒
☒
(a) (1) set out in our Corporate Governance Statement
[If the entity complies with paragraph (a):] (a) (2) the audit and risk committee is chaired by an independent director (a) (3) we have disclosed a copy of the charter of the committee at: https://catalystmetals.com.au/about-catalyst/corporate-governance/ and the information referred to in paragraphs (4) and (5) at: Directors Report section of the 2026 Annual Report and and 2026 Corporate Governance Statement
4.2
The board of a listed entity should, before it approves the entity’s financial statements for a financial period, receive from its CEO and CFO a declaration that, in their opinion, the financial records of the entity have been properly maintained and that the financial statements comply with the appropriate accounting standards and give a true and fair view of the financial position and performance of the entity and that the opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.
☒
☐
set out in our Corporate Governance Statement
4.3
A listed entity should disclose its process to verify the integrity of any periodic corporate report it releases to the market that is not audited or reviewed by an external auditor.
☒
☐
set out in our Corporate Governance Statement
ASX Listing Rules Appendix 4G (current at 17/7/2020)
Page 8
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement:
Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
A listed entity should have and disclose a written policy for complying with its continuous disclosure obligations under listing rule 3.1.
☒
☐
set out in our Corporate Governance Statement
5.2
A listed entity should ensure that its board receives copies of all material market announcements promptly after they have been made.
☒
☐
set out in our Corporate Governance Statement
5.3
A listed entity that gives a new and substantive investor or analyst presentation should release a copy of the presentation materials on the ASX Market Announcements Platform ahead of the presentation.
☒
☐
set out in our Corporate Governance Statement
A listed entity should provide information about itself and its governance to investors via its website.
☒
☐
set out in our Corporate Governance Statement
6.2
A listed entity should have an investor relations program that facilitates effective two-way communication with investors.
☒
☐
set out in our Corporate Governance Statement
6.3
A listed entity should disclose how it facilitates and encourages participation at meetings of security holders.
☒
☐
set out in our Corporate Governance Statement
A listed entity should ensure that all substantive resolutions at a meeting of security holders are decided by a poll rather than by a show of hands.
☒
☐
set out in our Corporate Governance Statement
Corporate Governance Council recommendation
PRINCIPLE 5 – MAKE TIMELY AND BALANCED DISCLOSURE 5.1
and we have disclosed our continuous disclosure compliance policy at: https://catalystmetals.com.au/about-catalyst/corporate-governance/
PRINCIPLE 6 – RESPECT THE RIGHTS OF SECURITY HOLDERS 6.1
6.4
ASX Listing Rules Appendix 4G (current at 17/7/2020)
and we have disclosed information about us and our governance on our website at: https://catalystmetals.com.au/about-catalyst/corporate-governance/
and we have disclosed how we facilitate and encourage participation at meetings of security holders at: https://catalystmetals.com.au/about-catalyst/corporate-governance/
Page 9
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement:
Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
☒
☐
set out in our Corporate Governance Statement
The board of a listed entity should: (a) have a committee or committees to oversee risk, each of which: (1) has at least three members, a majority of whom are independent directors; and (2) is chaired by an independent director, and disclose: (3) the charter of the committee; (4) the members of the committee; and (5) as at the end of each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or (b) if it does not have a risk committee or committees that satisfy (a) above, disclose that fact and the processes it employs for overseeing the entity’s risk management framework.
☒
☒
(a) (1) set out in our Corporate Governance Statement
The board or a committee of the board should: (a) review the entity’s risk management framework at least annually to satisfy itself that it continues to be sound and that the entity is operating with due regard to the risk appetite set by the board; and (b) disclose, in relation to each reporting period, whether such a review has taken place.
☒
☐
set out in our Corporate Governance Statement
Corporate Governance Council recommendation
6.5
A listed entity should give security holders the option to receive communications from, and send communications to, the entity and its security registry electronically.
PRINCIPLE 7 – RECOGNISE AND MANAGE RISK 7.1
7.2
ASX Listing Rules Appendix 4G (current at 17/7/2020)
[If the entity complies with paragraph (a):] (a) (2) the audit and risk committee is chaired by an independent director (a) (3) we have disclosed a copy of the charter of the committee at: https://catalystmetals.com.au/about-catalyst/corporate-governance/ and the information referred to in paragraphs (4) and (5) at: Directors Report section of the 2026 Annual Report and 2026 Corporate Governance Statement
and we have disclosed whether a review of the entity’s risk management framework was undertaken during the reporting period at: 2026 Corporate Governance Statement
Page 10
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Corporate Governance Council recommendation
Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement:
Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
7.3
A listed entity should disclose: (a) if it has an internal audit function, how the function is structured and what role it performs; or (b) if it does not have an internal audit function, that fact and the processes it employs for evaluating and continually improving the effectiveness of its governance, risk management and internal control processes.
☒
☐
set out in our Corporate Governance Statement
A listed entity should disclose whether it has any material exposure to environmental or social risks and, if it does, how it manages or intends to manage those risks.
☒
☐
set out in our Corporate Governance Statement
7.4
[If the entity complies with paragraph (b):] and we have disclosed the fact that we do not have an internal audit function and the processes we employ for evaluating and continually improving the effectiveness of our risk management and internal control processes at: 2026 Corporate Governance Statement
and we have disclosed whether we have any material exposure to environmental and social risks at: 2026 Corporate Governance Statement and Sustainability Report included in the 2026 Annual Report. and, if we do, how we manage or intend to manage those risks at: 2026 Corporate Governance Statement
ASX Listing Rules Appendix 4G (current at 17/7/2020)
Page 11
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Corporate Governance Council recommendation
Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement:
Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
☒
☒
(a) (1) set out in our Corporate Governance Statement OR
PRINCIPLE 8 – REMUNERATE FAIRLY AND RESPONSIBLY 8.1
8.2
8.3
The board of a listed entity should: (a) have a remuneration committee which: (1) has at least three members, a majority of whom are independent directors; and (2) is chaired by an independent director, and disclose: (3) the charter of the committee; (4) the members of the committee; and (5) as at the end of each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or (b) if it does not have a remuneration committee, disclose that fact and the processes it employs for setting the level and composition of remuneration for directors and senior executives and ensuring that such remuneration is appropriate and not excessive.
[If the entity complies with paragraph (a):] (a) (2) the nomination and remuneration committee is chaired by an independent director (a) (3) we have disclosed a copy of the charter of the committee at: https://catalystmetals.com.au/about-catalyst/corporate-governance/ and the information referred to in paragraphs (4) and (5) at: Directors Report section of the 2026 Annual Report and 2026 Corporate Governance Statement
A listed entity should separately disclose its policies and practices regarding the remuneration of non-executive directors and the remuneration of executive directors and other senior executives.
☒
☐
set out in our Corporate Governance Statement OR
and we have disclosed separately our remuneration policies and practices regarding the remuneration of non-executive directors and the remuneration of executive directors and other senior executives at: https://catalystmetals.com.au/about-catalyst/corporate-governance/ and Directors Report section of the 2026 Annual Report
☐
we are an externally managed entity and this recommendation is therefore not applicable
A listed entity which has an equity-based remuneration scheme should: (a) have a policy on whether participants are permitted to enter into transactions (whether through the use of derivatives or otherwise) which limit the economic risk of participating in the scheme; and (b) disclose that policy or a summary of it.
☒
☐
set out in our Corporate Governance Statement OR
and we have disclosed our policy on this issue or a summary of it at: https://catalystmetals.com.au/about-catalyst/corporate-governance/
☐
we do not have an equity-based remuneration scheme and this recommendation is therefore not applicable OR
☐
we are an externally managed entity and this recommendation is therefore not applicable
ASX Listing Rules Appendix 4G (current at 17/7/2020)
Page 12
Appendix 4G Key to Disclosures Corporate Governance Council Principles and Recommendations Corporate Governance Council recommendation
Where a box below is ticked, 4 we have followed the recommendation in full for the whole of the period above. We have disclosed this in our Corporate Governance Statement:
Where a box below is ticked, we have NOT followed the recommendation in full for the whole of the period above. Our reasons for not doing so are: 5
ADDITIONAL RECOMMENDATIONS THAT APPLY ONLY IN CERTAIN CASES 9.1
9.2
9.3
A listed entity with a director who does not speak the language in which board or security holder meetings are held or key corporate documents are written should disclose the processes it has in place to ensure the director understands and can contribute to the discussions at those meetings and understands and can discharge their obligations in relation to those documents.
☐
☐
set out in our Corporate Governance Statement OR
and we have disclosed information about the processes in place at: https://catalystmetals.com.au/about-catalyst/corporate-governance/
☒
we do not have a director in this position and this recommendation is therefore not applicable OR
☐
we are an externally managed entity and this recommendation is therefore not applicable
A listed entity established outside Australia should ensure that meetings of security holders are held at a reasonable place and time.
☐
☐
set out in our Corporate Governance Statement OR
☒
we are established in Australia and this recommendation is therefore not applicable OR
☐
we are an externally managed entity and this recommendation is therefore not applicable
☐
set out in our Corporate Governance Statement OR
☒
we are established in Australia and not an externally managed listed entity and this recommendation is therefore not applicable
☐
we are an externally managed entity that does not hold an AGM and this recommendation is therefore not applicable
A listed entity established outside Australia, and an externally managed listed entity that has an AGM, should ensure that its external auditor attends its AGM and is available to answer questions from security holders relevant to the audit.
ASX Listing Rules Appendix 4G (current at 17/7/2020)
☐
Page 13
CORPORATE GOVERNANCE STATEMENT
This Corporate Governance Statement is current as at 21 October 2026 and has been approved by the Board. This Corporate Governance Statement discloses the extent to which Catalyst Metals Limited (Company) has for the year ended 30 June 2026 followed the recommendations set by the ASX Corporate Governance Council in its publication Corporate Governance Principles and Recommendations (4th edition). The Recommendations are not mandatory; however, where a Recommendation has not been followed for any part of the reporting period, this has been identified below together with the reasons for not following it and any alternative governance practices adopted during that period.
1
Catalyst Metals Limited Corporate Governance Statement The Company’s Corporate Governance Policies are available on the Company’s website at https://catalystmetals.com.au/corporategovernance/
RECOMMENDATIONS (4TH EDITION)
COMPLY
EXPLANATION
Principle 1: Lay solid foundations for management and oversight Recommendation 1.1 A listed entity should have and disclose a board charter setting out:
YES
(a) the respective roles and responsibilities of its board and management; and
The Company has adopted a Board Charter that sets out the specific roles and responsibilities of the Board, the Chair and Board Committees and includes a description of those matters expressly reserved for the Board and those delegated to management. The Board Charter sets out the specific responsibilities of the Board, requirements as to the Board’s composition, the roles and responsibilities of the Directors, Chairman and Company Secretary, the establishment, operation and management of Board Committees, Directors’ access to Company records and information and details of the Board’s performance review.
(b) those matters expressly reserved to the board and those delegated to management.
A copy of the Company’s Board Charter is available on the Company’s website. Recommendation 1.2 A listed entity should: (a) undertake appropriate checks before appointing a person, or putting forward to security holders a candidate for election, as a Director; and (b) provide security holders with all material information relevant to a decision on whether or not to elect or reelect a Director.
YES
a) Prior to a candidate being considered for appointment as a director of the Company, appropriate enquiries are made as to the person’s character, experience, education, criminal record and bankruptcy history. These checks were undertaken prior to the appointments of Ms Anna Shave and Mr Mark Connelly during the year. b) Shareholders are provided with relevant information on any directors standing for re-election at a general meeting of the Company, including relevant qualifications and experience.
2
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
Recommendation 1.3 A listed entity should have a written agreement with each Director and senior executive setting out the terms of their appointment.
YES
Recommendation 1.4 The company secretary of a listed entity should be accountable directly to the Board, through the Chair, on all matters to do with the proper functioning of the Board.
YES
Recommendation 1.5 A listed entity should: (a) have and disclose a diversity policy; (b) through its board or a committee of the board set measurable objectives for achieving gender diversity in the composition of its board, senior executives and workforce generally; and (c) disclose as at the end of each reporting period: (1) the measurable objectives set for that period to achieve gender diversity; (2) the entity’s progress towards achieving those objectives; and (3) either: (A) the respective proportions of men and women on the board, in senior executive positions and across the whole workforce
PARTIALLY
EXPLANATION The Company has entered into written agreements with all senior executives. It has also entered into letters of appointment with each of its non-executive Directors, setting out the key terms and conditions of their appointments. Material variations to these agreements are disclosed to the ASX to the extent required by the ASX Listing Rules. The Board Charter outlines the roles, responsibilities and accountability of the Company Secretary. In accordance with this, the Company Secretary is accountable directly to the Board, through the Chair, for all matters related to the proper functioning of the Board. a) The Company has adopted a Diversity Policy, which allows the Board, subject to the size and operations of the Company, to set measurable objectives to assist the Company in achieving gender diversity. The Board will review the Company's progress in meeting these objectives and the effectiveness of these objectives annually. The Company is committed to establishing a workplace which demonstrates diversity and equal opportunity as a means of enhancing the Company's performance and organisational capabilities by recognising and utilising the contribution of the diverse skills and talents of its directors, officers and employees. Diversity may result from a range of factors including age, gender, ethnicity, cultural background or other personal factors. The Company values the differences between its people and the contribution these differences can make to the success of the Company.
3
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION) (including how the entity has defined “senior executive” for these purposes); or (B) if the entity is a “relevant employer” under the Workplace Gender Equality Act, the entity’s most recent “Gender Equality Indicators”, as defined in and published under that Act.31
COMPLY
EXPLANATION The Nomination & Remuneration Committee (NRC) is responsible for recommending measurable objectives to the Board, in line with the Company's general personnel selection policy, and reporting to the Board on the Company's progress towards achieving these objectives annually. b) The Diversity Policy is available on the Company’s website: (https://catalystmetals.com.au/corporate-governance/) c) Following the end of FY25 the Board established a measurable objective to achieve gender diversity in its Board composition, aiming for a target of at least 30% representation of each gender on the Board. The Company achieved 20% female representation of directors during FY26 (FY25: 0%) The NRC and Board will continue to monitor this measurable objective actively and also seek to improve its female representation in senior management roles and employees. The Board did not set any other measurable gender diversity objectives for the year ended 30 June 2026. The respective proportions of gender diversity on the Board, in senior management positions and across the whole organisation as at 30 June 2026 is detailed below. Level
30 June 2026
Females on the Board
20%
Females in senior management roles*
14%
4
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
EXPLANATION Female employees in the Group (excluding senior management roles*)
15%
- Senior management roles refer to the Managing Director and all senior personnel reporting to the Managing Director of to the Plutonic General Manager. Recommendation 1.6 A listed entity should:
YES
(a) have and disclose a process for periodically evaluating the performance of the Board, its committees and individual Directors; and
The NRC Charter outlines the process for reviewing and evaluating the performance of the Board, which requires the Board to meet annually with the specific purpose of reviewing the role of the Board and assessing its performance over the past year, including assessing ways to assist the Board in performing its duties more effectively. The Chairman and the Board regularly review the performance and composition of the Board considering issues or concerns as they arise. This internal process is conducted informally and relies on regular discussion between the Chairman and all Board members.
(b) disclose, in relation to each reporting period, whether a performance evaluation was undertaken in the reporting period in accordance with that process.
The Board also annually reviews the performance of the Managing Director based on individual performance as well as a range of business and company-specific performance measures, which are set at the commencement of the financial year. Furthermore, the Chair meets regularly with the Managing Director to review and discuss operational and performance related matters The performance evaluations of individual directors are undertaken by the Chair, considering their performance and contribution to the Board throughout the year. The above performance evaluations have been undertaken for the 2026 financial year. Recommendation 1.7 A listed entity should:
YES
The Managing Director is responsible for assessing the performance of key executives within the Company at least once every reporting period. This is carried out through a formal process involving a formal
5
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
(a) have and disclose a process for periodically evaluating the performance of its senior executives; and
EXPLANATION meeting with each senior executive. Senior executives are evaluated based on agreed individual, team and group performance measures.
(b) disclose, in relation to each reporting period, whether a performance evaluation was undertaken in the reporting period in accordance with that process.
Performance reviews for the senior executives for the 2026 financial year were conducted.
Principle 2: Structure the Board to add value Recommendation 2.1 The Board of a listed entity should: (a) have a nomination committee which: (i)
has at least three members, a majority of whom are independent Directors; and
(ii)
is chaired by an independent Director,
and disclose: (iii) the charter of the committee; (iv) the members of the committee; and (v)
as at the end of each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or
(b) if it does not have a nomination committee, disclose that fact and the processes it employs to address Board succession issues and to ensure that the Board has the appropriate balance of skills, experience, independence and knowledge of the entity to enable it to discharge its duties and responsibilities effectively.
PARTIALLY
The Company has an established Nomination and Remuneration Committee. The Committee Charter is available on the Company’s website: (https://catalystmetals.com.au/corporate-governance/). From 30 June 2025 to 7 September 2025, the Nomination and Remuneration Committee comprised two non-executive directors, both of whom were assessed as independent directors during the year and one non-executive director who was not assessed as an independent director as outlined below. Given the composition of the Board at this time there was not another independent Director to be appointed to the Committee. •
Robin Scrimgeour (Committee Chair and Independent NonExecutive Director)
•
David Jones (Independent Non-Executive Director); and
•
Bruce Kay (Non-Independent Non-Executive Director)
From 8 September 2025 to 2 March 2026, the Committee comprised three members: •
Anna Shave (Committee Chair and Independent NonExecutive Director);
•
David Jones (Independent Non-Executive Director); and
•
Robin Scrimgeour (Independent Non-Executive Director).
6
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
EXPLANATION From 2 March 2026 to the date of this statement, the Committee comprised three members: •
Anna Shave (Committee Chair and Independent NonExecutive Director);
•
Mark Connelly (Independent Non-Executive Director); and
•
Robin Scrimgeour (Independent Non-Executive Director).
Accordingly, the Committee is now chaired by an independent director and consists of a majority of independent directors. Details of Board Committee meetings and member attendance are provided in the Directors’ Report in the Annual Report. Recommendation 2.2
YES
A listed entity should have and disclose a Board skill matrix setting out the mix of skills and diversity that the Board currently has or is looking to achieve in its membership.
A board skills matrix has been developed and will be regularly reviewed by the Board to ensure it has an appropriate mix of skills, experience and diversity to conduct its operations in an effective manner. The skills matrix is attached in Annexure 1. Details of each of the Director’s skills and experience are also outlined in the Company’s Annual Report.
Recommendation 2.3 A listed entity should disclose: (a) the names of the Directors considered by the Board to be independent Directors; (b) if a Director has an interest, position, association or relationship of the type described in Box 2.3 of the ASX Corporate Governance Principles and Recommendation (4th Edition), but the Board is of the opinion that it does not compromise the independence of the Director, the nature of the
YES
The Board has assessed the independence of each director in accordance with the ASX Corporate Governance Principles and Recommendations. The independent directors during the financial year were: • Mr Mark Connelly – Independent Non-executive Chairperson (appointed 2 March 2026); • Mr David Jones – Independent Non-executive Chairperson (resigned 2 March 2026); • Mr Robin Scrimgeour – Independent Non-executive Director; and
7
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION) interest, position, association or relationship in question and an explanation of why the Board is of that opinion; and (c) the length of service of each Director
COMPLY
EXPLANATION •
Ms Anna Shave – Independent Non-executive Director.
Mr James Champion de Crespigny is not considered an independent director by virtue of his position as Managing Director of the Company. Mr Bruce Kay is not considered an independent director as he provides regular consultancy services to the Company. Mr Robin Scrimgeour has served on the Board since 1 September 2009. The Board (excluding Mr Scrimgeour) has considered his length of tenure and remains of the view that Mr Scrimgeour continues to exercise objective and independent judgement, is not influenced by management, and that his extensive knowledge of the Company’s operations enhances the effectiveness of the Board. The Board will continue to assess Mr Scrimgeour’s independence annually. The length of service of each director is set out below, and disclosed in its Annual Report: Director
Appointment date
Mr Mark Connelly
2 March 2026
Mr David Jones
1 October 2023 (resigned 2 March 2026)
Mr Robin Scrimgeour
1 September 2009
Mr Bruce Kay
9 February 2011
8
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
Recommendation 2.4 A majority of the Board of a listed entity should be independent Directors.
PARTIALLY
Recommendation 2.5 The Chair of the Board of a listed entity should be an independent Director and, in particular, should not be the same person as the CEO of the entity.
YES
Mr James Champion de Crespigny
12 November 2021
Ms Anna Shave
8 September 2025
From 1 July 2025 to 7 September 2025 the Board comprised four directors, of whom two were independent directors. Following the appointment of Anna Shave on 8 September 2025 the Board has a comprised a majority of independent directors. The Board will continue to evaluate and consider future additions to the Board having regard to the required skills, experience and diversity required by the Company to support its continued growth. The Board Charter provides that, where practical, the Chair of the Board should be an independent Director and should not be the CEO/Managing Director. The Company’s Chair, Mr Mark Connelly (appointed 2 March 2026), is considered an independent director, and he does not hold the role of CEO. Prior to Mr Connelly’s appointment, the Chair was David Jones (resigned 2 March 2026) who was also an independent director and did not hold the role of CEO.
Recommendation 2.6 A listed entity should have a program for inducting new Directors and providing appropriate professional development opportunities for continuing Directors to develop and maintain the skills and knowledge needed to perform their role as a Director effectively.
EXPLANATION
YES
New directors are provided with an induction including comprehensive briefings with the Chair and Managing Director, provision of material information on the Company, including Company and Board policies. All directors are expected to maintain the skills required to effectively discharge their obligations to the Company. Directors are encouraged to undertake professional development programs and training to develop and maintain the skills and knowledge needed
9
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
EXPLANATION to perform their role as directors of the Company, which is reviewed annually.
Principle 3: Act ethically and responsibly The Company’s values are:
Recommendation 3.1 A listed entity should articulate and disclose its values.
YES
• • • • •
Safety: the health, safety and welfare of our employees and the community is of paramount importance; Balance: achieving a balance between economic development, maintenance of the environment and social responsibility; Recognition: recognising, valuing and rewarding the individual contribution of each employee; Respect: acting fairly and with respect, maintaining good relationships; and Integrity: acting honestly, lawfully and ethically.
The Company’s values are available in the Code of Conduct, which is published on the Company’s website: (https://catalystmetals.com.au/corporate-governance/) Recommendation 3.2 A listed entity should: (a) have a code of conduct for its Directors, senior executives and employees; and (b) disclose that code or a summary of it.
YES
The Company’s Code of Conduct sets out a statement of the Company’s identity, purpose and commitment to values, including the Company’s primary objective of maximising shareholder returns through the exploration and mining of minerals whilst acting lawfully, ethically and responsibly. A copy of the Code of Conduct is available at the Company’s website: (https://catalystmetals.com.au/corporate-governance/)
10
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
EXPLANATION Material breaches of the Code are required to be reported to the Board. No breaches have been reported in the financial year ended 30 June 2026.
Recommendation 3.3
YES
A listed entity should: (a) have and disclose a whistleblower policy; and
A copy of the Whistleblower Policy is available on the Company’s website:
(b) ensure that the board or a committee of the board is informed of any material incidents reported under that policy.
Recommendation 3.4
The Company has a Whistleblower Policy which provides an independent mechanism for the legitimate reporting of illegal or unethical practices by company employees.
(https://catalystmetals.com.au/corporate-governance/) The Authorised Officers will report to the Board any material incidents reported under the Whistleblower Policy. No incidents have been reported in the financial year ended 30 June 2026. YES
A listed entity should: (a) have and disclose an anti-bribery and corruption policy; and
The Company has established an Anti-Bribery and Corruption Policy to provide a framework for the Company to conduct its business activities fairly, honestly and with integrity and in compliance with all applicable laws, rules and regulations. A copy of the Anti-Bribery and Corruption Policy is available on the Company’s website:
(b) ensure that the board or a committee of the board is informed of any material breaches of that policy
(https://catalystmetals.com.au/corporate-governance/) Material breaches of the Anti-Bribery and Corruption Policy should be reported to the Board by the Compliance Officer. No breaches have been reported in the financial year ended 30 June 2026.
Principle 4: Safeguard integrity in financial reporting Recommendation 4.1 The Board of a listed entity should:
PARTIALLY
The Company has an established Audit and Risk Committee. The Committee Charter is available on the Company’s website: (https://catalystmetals.com.au/corporate-governance/). From 30 June 2025 to 7 September 2025, the Audit & Risk Committee
11
Catalyst Metals Limited Corporate Governance Statement (a) have an audit committee which: (i) has at least three members, all of whom are non-executive Directors and a majority of whom are independent Directors; and (ii) is chaired by an independent Director, who is not the chair of the Board, and disclose: (iii) (iv)
the charter of the committee; the relevant qualifications and experience of the members of the committee; and (v) in relation to each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or (b) if it does not have an audit committee, disclose that fact and the processes it employs that independently verify and safeguard the integrity of its financial reporting, including the processes for the appointment and removal of the external auditor and the rotation of the audit engagement partner.
comprised two non-executive directors, both of whom were assessed as independent directors during the year and one nonexecutive director who was not assessed as an independent director as outlined below. Given the composition of the Board at this time there was not another independent Director to be appointed to the Committee. •
Robin Scrimgeour (Committee Chair and Independent NonExecutive Director)
•
David Jones (Independent Non-Executive Director); and
•
Bruce Kay (Non-Independent Non-Executive Director)
From 8 September 2025 to 2 March 2026, the Committee comprised three members: •
Anna Shave (Committee Chair and Independent NonExecutive Director);
•
David Jones (Independent Non-Executive Director); and
•
Robin Scrimgeour (Independent Non-Executive Director).
From 2 March 2026 to the date of this statement, the Committee comprised three members: •
Anna Shave (Committee Chair and Independent NonExecutive Director);
•
Mark Connelly (Independent Non-Executive Director); and
•
Robin Scrimgeour (Independent Non-Executive Director).
Accordingly, the Committee is chaired by an independent director and consists of a majority of independent directors. Details of Board Committee meetings and member attendance are provided in the Directors’ Report in the Annual Report. The relevant qualifications and experience of the members of the Committee are set out in the Directors’ Report in the Annual Report.
12
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
EXPLANATION
The Board of a listed entity should, before it approves the entity’s financial statements for a financial period, receive from its CEO and CFO a declaration that the financial records of the entity have been properly maintained and that the financial statements comply with the appropriate accounting standards and give a true and fair view of the financial position and performance of the entity and that the opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.
YES
The Company’s Audit and Risk Committee Charter requires the CEO and CFO (or, if none, the person(s) fulfilling those functions) to provide a sign-off on these terms.
Recommendation 4.3
YES
Recommendation 4.2
A listed entity should disclose its process to verify the integrity of any periodic corporate report it releases to the market that is not audited or reviewed by an external auditor.
Before approving the Company’s financial statements for the halfyear ended 31 December 2025 and the financial year ended 30 June 2026, the Board received declarations from the Managing Director and the Chief Financial Officer in accordance with Recommendation 4.2.
The Company has practices in place to verify the integrity of the Company’s periodic reports which are not audited or reviewed by an external auditor, to satisfy the Board that each periodic report is materially accurate, balanced and provides investors with appropriate information to make informed market decisions. Material non-audited periodic reports are prepared by, or under the supervision of, subject-matter experts from senior management before being reviewed and approved by the Managing Director, Chief Financial Officer, Investor Relations Manager, Company Secretary and Competent Person, as applicable and then finally reviewed and authorised for release to the market by the Board. In the event further legal or financial review is required, the proposed disclosure is run past the Company’s advisors, lawyers, or auditors (as appropriate) for review.
13
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
EXPLANATION
A listed entity should have and disclose a written policy for complying with its continuous disclosure obligations under listing rule 3.1.
YES
The Company has a formal written policy for the continuous disclosure of any price sensitive information concerning the Company, which is available on the Company’s website:
Recommendation 5.2
YES
Market announcements are circulated to the Board for review prior to release, and the proposed date for lodgement is noted. The Board receives confirmation of the lodgement of material announcements after they have been made.
YES
The Company’s Continuous Disclosure Policy requires that any new and substantive investor presentations be lodged with ASX prior to the investor briefing commencing.
Principle 5: Make timely and balanced disclosure Recommendation 5.1
(https://catalystmetals.com.au/corporate-governance/)
A listed entity should ensure that its board receives copies of all material market announcements promptly after they have been made. Recommendation 5.3 A listed entity that gives a new and substantive investor or analyst presentation should release a copy of the presentation materials on the ASX Market Announcements Platform ahead of the presentation. Principle 6: Respect the rights of security holders Recommendation 6.1 A listed entity should provide information about itself and its governance to investors via its website.
YES
Recommendation 6.2 A listed entity should design and implement an investor relations program to facilitate effective two-way communication with investors.
YES
Information about the Company, its mining projects and its corporate governance, including copies of the Company’s various corporate governance policies and charters, are available on its website. The Company has adopted a Shareholder Communications Strategy which aims to promote and facilitate effective two-way communication with investors. The Strategy outlines a range of ways in which information is communicated to shareholders and is available on the Company’s website.
14
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
EXPLANATION A copy of the Shareholders Communication Policy is available on the Company’s website: (https://catalystmetals.com.au/corporate-governance/)
Recommendation 6.3 A listed entity should disclose the policies and processes it has in place to facilitate and encourage participation at meetings of security holders.
YES
Recommendation 6.4
YES
A listed entity should ensure that all substantive resolutions at a meeting of security holders are decided by a poll rather than by a show of hands Recommendation 6.5 A listed entity should give security holders the option to receive communications from, and send communications to, the entity and its security registry electronically.
YES
The Shareholders Communication Policy referred to above includes measures designed to facilitate and encourage shareholder participation at meetings. The Company’s website provides links to all announcements released to the ASX. Shareholders are encouraged to attend and actively participate in all shareholder meetings, including raising questions to the Board and management. The Company intends to ensure that all substantive resolutions at a meeting of security holders are decided by a poll rather than by a show of hands. All resolutions at the 2025 AGM were decided on a poll. The Company’s share register is currently maintained by Automic Registry Services. Shareholders have the option of receiving shareholder communications from the Company and Automic electronically, unless an original signature or documents are required.
Principle 7: Recognise and manage risk Recommendation 7.1 The Board of a listed entity should: (a) have a committee or committees to oversee risk, each of which:
PARTIALLY
The Company has an established Audit and Risk Committee. The Committee Charter is available on the Company’s website: (https://catalystmetals.com.au/corporate-governance/). From 30 June 2025 to 7 September 2025, the Audit & Risk Committee comprised two non-executive directors, both of whom were assessed as independent directors during the year and one non-
15
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION) (i)
has at least three members, a majority of whom are independent Directors; and
(ii)
is chaired by an independent Director,
COMPLY
EXPLANATION executive director who was not assessed as an independent director as outlined below. Given the composition of the Board at this time there was not another independent Director to be appointed to the Committee.
and disclose:
•
Robin Scrimgeour (Committee Chair and Independent NonExecutive Director)
the members of the committee; and
•
David Jones (Independent Non-Executive Director); and
as at the end of each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or
•
Bruce Kay (Non-Independent Non-Executive Director)
(iii)
the charter of the committee;
(iv) (v)
From 8 September 2025 to 2 March 2026, the Committee comprised three members:
(b) if it does not have a risk committee or committees that satisfy (a) above, disclose that fact and the process it employs for overseeing the entity’s risk management framework.
•
Anna Shave (Committee Chair and Independent NonExecutive Director);
•
David Jones (Independent Non-Executive Director); and
•
Robin Scrimgeour (Independent Non-Executive Director).
From 2 March 2026 to the date of this statement, the Committee comprised three members: •
Anna Shave (Committee Chair and Independent NonExecutive Director);
•
Mark Connelly (Independent Non-Executive Director); and
•
Robin Scrimgeour (Independent Non-Executive Director).
Accordingly, the Committee is chaired by an independent director and consists of a majority of independent directors. Details of Board Committee meetings and member attendance are provided in the Directors’ Report in the Annual Report. Recommendation 7.2 The Board or a committee of the Board should:
YES
The Audit and Risk Committee is responsible for assisting the Board in overseeing the Company’s risk management and internal control framework. While responsibility for internal controls and risk
16
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
(a) review the entity’s risk management framework with management at least annually to satisfy itself that it continues to be sound; and
EXPLANATION management is delegated to the appropriate levels of management, the Managing Director holds ultimate accountability to the Board for the effectiveness of the risk management and control framework.
(b) disclose in relation to each reporting period, whether such a review has taken place.
The Committee works closely with management to identify and manage operational, financial, and compliance risks that may impact the Company’s ability to achieve its objectives. The Board has undertaken a review of the risk framework and risk register during the financial year. The Board and executive management regularly consider and evaluate material risks facing the business and mitigation strategies to address these risks at Board meetings.
Recommendation 7.3 A listed entity should disclose: (a) if it has an internal audit function, how the function is structured and what role it performs; or (b) if it does not have an internal audit function, that fact and the processes it employs for evaluating and continually improving the effectiveness of its risk management and internal control processes.
YES
The Company does not have a separate internal audit function, as the Board believes that existing internal controls and management systems provide sufficient assurance that the Company’s risk management, governance and internal control processes operate effectively. The Company will continue to review this assessment as the level of business operations evolve and grow. Operational, financial, legal, compliance and strategic risks are managed as part of the day-to-day management of the Company’s affairs with the support of relevant external professional advisers as required. Management is further responsible for undertaking and assessing the effectiveness of risk management and internal control. The Board. through the Audit and Risk Committee oversees and monitors the effectiveness of these processes.
17
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
Recommendation 7.4 A listed entity should disclose whether it has any material exposure to environmental and social sustainability risks and, if it does, how it manages or intends to manage those risks.
Yes
EXPLANATION The Company undertakes mining and mineral exploration activities and recognises that there are inherent risks in conducting its business operations. Material risks related to environmental and social sustainability include mining and operational risks, health and safety, community and environmental risks, climate-related risks (both physical and transition), water management, tailings storage, mine closure and rehabilitation obligations, Aboriginal cultural heritage, and compliance and regulatory risks. While some of these risks are outside the Company’s direct control and require mitigation strategies, others are managed through established operational and management systems. The systems and processes implemented to manage material risks include monthly operations and financial reporting; regular reports to the Board by management and/or independent advisers outlining the nature of particular risks and related risk mitigation measures; clearly defined management responsibilities and organisational structure; delegated limits of authority; treasury and accounting controls and reconciliations; introduction of comprehensive management reporting systems; budgeting and strategic planning processes; segregation of duties and supervision; appropriate policies and procedures that are widely disseminated to employees; development of integrated management systems; and specific health and safety policies and procedures. Further details in regard to environmental and social sustainability risks are outlined in the Company’s Sustainability Report included in the 2026 Annual Report.
Principle 8: Remunerate fairly and responsibly Recommendation 8.1
The Company has an established Nomination and Remuneration Committee. The Committee Charter is available on the Company’s
18
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
The Board of a listed entity should:
PARTIALLY
(a) have a remuneration committee which: (i)
has at least three members, a majority of whom are independent Directors; and
(ii)
is chaired by an independent Director,
and disclose: (iii)
the charter of the committee;
(iv)
the members of the committee; and
(v)
as at the end of each reporting period, the number of times the committee met throughout the period and the individual attendances of the members at those meetings; or
(b) if it does not have a remuneration committee, disclose that fact and the processes it employs for setting the level and composition of remuneration for Directors and senior executives and ensuring that such remuneration is appropriate and not excessive.
EXPLANATION website: (https://catalystmetals.com.au/corporate-governance/). From 30 June 2025 to 7 September 2025, the Nomination and Remuneration Committee comprised two non-executive directors, both of whom were assessed as independent directors during the year and one non-executive director who was not assessed as an independent director as outlined below. Given the composition of the Board at this time there was not another independent Director to be appointed to the Committee. •
Robin Scrimgeour (Committee Chair and Independent NonExecutive Director)
•
David Jones (Independent Non-Executive Director); and
•
Bruce Kay (Non-Independent Non-Executive Director)
From 8 September 2025 to 2 March 2026, the Committee comprised three members: •
Anna Shave (Committee Chair and Independent NonExecutive Director);
•
David Jones (Independent Non-Executive Director); and
•
Robin Scrimgeour (Independent Non-Executive Director).
From 2 March 2026 to the date of this statement, the Committee comprised three members: •
Anna Shave (Committee Chair and Independent NonExecutive Director);
•
Mark Connelly (Independent Non-Executive Director); and
•
Robin Scrimgeour (Independent Non-Executive Director).
Accordingly, the Committee is chaired by an independent director and consists of a majority of independent directors.
19
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
EXPLANATION Details of Board Committee meetings and member attendance are provided in the Directors’ Report in the Annual Report.
Recommendation 8.2 A listed entity should separately disclose its policies and practices regarding the remuneration of non-executive directors and the remuneration of executive directors and other senior executives.
YES
The Nomination and Remuneration Committee (NRC) Charter provides that the NRC is responsible for establishing the policies and practices of the Company regarding the remuneration of directors and other senior executives and reviewing all components of the remuneration framework, advising the Board on the composition of the Board and its committees, reviewing the performance of the Board, its committees and the individual directors, ensuring the proper succession plans are in place and advising the Board in respect of the effectiveness of its corporate governance policies and developments in corporate governance. The NRC makes specific recommendations in relation to compensation arrangements for executive and non-executive directors including with respect to all equity-based remuneration plans. The structure for the remuneration of non-executive directors and senior executives is separate and distinct. Non-executive directors are remunerated by way of fixed fees within the aggregate fee pool approved by shareholders and do not receive performance-based remuneration. Details of the Company’s remuneration policies are set out in the Remuneration Report section of the 2026 Annual Report.
20
Catalyst Metals Limited Corporate Governance Statement RECOMMENDATIONS (4TH EDITION)
COMPLY
Recommendation 8.3 A listed entity which has an equity-based remuneration scheme should: (a) have a policy on whether participants are permitted to enter into transactions (whether through the use of derivatives or otherwise) which limit the economic risk of participating in the scheme; and
YES
EXPLANATION Where the Company grants securities under an equity-based remuneration scheme, participants are prohibited from entering into arrangements for the hedging, or otherwise limiting their exposure to risk in relation to unvested shares, options or rights issued or acquired under the scheme. Any person who is covered under the Company’s Share Trading Policy is prohibited from entering into any transaction to hedge securities held in the Company or from entering into margin loans against their shareholdings in the Company.
(b) disclose that policy or a summary of it.
21
Catalyst Metals Limited Corporate Governance Statement
Annexure 1 – Skills Matrix
22
CATALYST METALS LIMITED ABN 54 118 912 495
NOTICE OF ANNUAL GENERAL MEETING EXPLANATORY MEMORANDUM PROXY FORM
Notice is given that the Meeting will be held at:
Date and time of meeting: 12 November 2026 at 10.00 a.m. Place of meeting: Celtic Club 48 Ord Street West Perth, Western Australia
AGENDA
CATALYST METALS LIMITED NOTICE OF ANNUAL GENERAL MEETING
Financial statements and reports To receive and consider the annual financial report of the Company, the declaration of the Directors, the Directors report, the Remuneration Report and auditors report for the financial year ended 30 June 2026. 1.
Resolution 1:
Adoption of the Remuneration Report
To consider and if thought fit to pass, with or without amendment, the following resolution as a nonbinding resolution: “That for the purposes of Section 250R(2) of the Corporations Act, the Company adopts the Remuneration Report as contained in the annual financial report of the Company for the year ended 30 June 2026.” Note: the vote on this Resolution is advisory only and does not bind the Directors or the Company. 2.
Resolution 2: Re-election of Bruce Kay as a Director
To consider and if thought fit to pass, with or without amendment, the following resolution as an ordinary resolution: “That Bruce Kay, being a Director of the Company, retires by rotation in accordance with Clause 6.1(f)(i) of the Constitution and being eligible offers himself for re-election, is hereby re-elected as a Director of the Company effective immediately.” 3.
Resolution 3: Election of Mark Connelly as a Director
To consider and if thought fit to pass, with or without amendment, the following resolution as an ordinary resolution: “That Mark Connelly, a Director appointed as an additional Director and holding office until the next general meeting of the Company after his appointment in accordance with Clause 6.1(e) of the Company’s Constitution and ASX Listing Rule 14.4, be elected as a Director of the Company, effective immediately.” 4.
Resolution 4: Ratification of Prior Issue of the Albright Consideration Shares
To consider and if thought fit to pass, with or without amendment, the following resolution as an ordinary resolution: “That, for the purposes of ASX Listing Rule 7.4 and for all other purposes, the Shareholders ratify the allotment and prior issue of 105,387 Shares issued to Albright Metals on 5 March 2026 and otherwise on the terms and conditions set out in the Explanatory Memorandum which accompanies and forms part of this Notice of Meeting.”
-1-
Resolution 5: Ratification of Prior Issue of the Star Consideration Shares
To consider and if thought fit to pass, with or without amendment, the following resolution as an ordinary resolution: “That, for the purposes of ASX Listing Rule 7.4 and for all other purposes, the Shareholders ratify the allotment and prior issue of 230,536 Shares issued to Star Minerals on 18 March 2026 and otherwise on the terms and conditions set out in the Explanatory Memorandum which accompanies and forms part of this Notice of Meeting.” 6.
Resolution 6: Approval to Issue Securities to Unrelated Parties under the Company’s Employee Securities Incentive Plan
To consider and if thought fit to pass, with or without amendment, the following resolutions as an ordinary resolution: “That, for the purposes of Listing Rule 7.2 (Exception 13(b)) and for all other purposes, approval is given to issue up to a maximum number of 13,000,000 equity securities under the employee incentive scheme titled “Catalyst Employee Incentive Plan”, on the terms and conditions set out in the Explanatory Statement.” 7.
Resolution 7: Approval to issue LTI Performance Rights to James Champion de Crespigny (or his nominee) for the current financial year (FY27 LTI Performance Rights)
To consider and if thought fit to pass, with or without amendment, the following resolutions as an ordinary resolution: “That, for the purposes of ASX Listing Rule 10.14, Sections 200B and 200E of the Corporations Act and for all other purposes, approval is given for the issue of 130,890 FY27 LTI Performance Rights to James Champion de Crespigny (or his nominee), in satisfaction of long term incentive plan entitlements for the financial year commencing 1 July 2026 (which have a three year performance measurement period to 30 June 2029), in accordance with the Catalyst Metals Employee Incentive Plan and upon the terms and conditions outlined in the Explanatory Memorandum.” 8.
Resolution 8: Renewal of Proportional Takeover Provisions in the Constitution
To consider and, if thought fit, to pass the following resolution as a special resolution: “That, for the purposes of sections 136(2) and 648G of the Corporations Act and for all other purposes, approval is given for the Company to modify its existing Constitution by renewing clause 14 for a period of three years from the date of approval of this Resolution.”
-2-
VOTING EXCLUSION STATEMENTS Resolution 1
Resolution 4
Voting exclusion statement: The Company will disregard any votes cast on the Resolution by or on behalf of a member of the Key Management Personnel whose remuneration details are included in the Remuneration Report, or their Closely Related Parties. However, the Company need not disregard a vote if: (a) it is cast by a person as a proxy appointed by writing that specifies how the proxy is to vote on the proposed Resolution or the proxy is the Chair of the Meeting and the appointment of the Chair as proxy does not specify the way the proxy is to vote on the resolution and expressly authorises the Chair to exercise the proxy even if the resolution is connected directly or indirectly with the remuneration of a member of the Key Management Personnel; and (b) it is not cast on behalf of a member of the Key Management Personnel whose remuneration details are included in the Remuneration Report, or their Closely Related Parties. Further, a Restricted Voter who is appointed as a proxy will not vote on the Resolution unless: (a) the appointment specifies the way the proxy is to vote on the Resolution; or (b) the proxy is the Chair of the Meeting and the appointment expressly authorises the Chair to exercise the proxy even though the Resolution is connected directly or indirectly with the remuneration of a member of the Key Management Personnel. Shareholders should note that the Chair intends to vote any undirected proxies in favour of the Resolution. Shareholders may also choose to direct the Chair to vote against the Resolution or to abstain from voting. If any of the persons named above purport to cast a vote other than as permitted above, that vote will be disregarded by the Company (as indicated above) and those persons may be liable for breaching the voting restrictions that apply to them under the Corporations Act. Voting exclusion statement: The Company will disregard any votes cast in favour of this Resolution by or on behalf of: (a) Albright Metals Limited; or (b) an Associate of Albright Metals Limited However, this does not apply to a vote cast in favour of the Resolution by: (a) a person as proxy or attorney for a person who is entitled to vote on the Resolution, in accordance with the directions given to the proxy or attorney to vote on the Resolution in that way; or (b) the Chair of the Meeting as proxy or attorney for a person who is entitled to vote on the Resolution, in accordance with a direction given to the Chair to vote on the Resolution as the Chair decides; or (c) a holder acting solely in a nominee, trustee, custodial or other fiduciary capacity on behalf of a beneficiary provided the following conditions are met: (i)
Resolution 5
the beneficiary provides written confirmation to the holder that the beneficiary is not excluded from voting, and is not an Associate of a person excluded from voting, on the Resolution; and
(ii) the holder votes on the Resolution in accordance with directions given by the beneficiary to the holder to vote in that way. Voting exclusion statement: The Company will disregard any votes cast in favour of this Resolutions by or on behalf of: (a) Star Minerals Limited or (b) an Associate of Star Minerals Limited However, this does not apply to a vote cast in favour of the Resolution by: (a) a person as proxy or attorney for a person who is entitled to vote on the Resolution, in accordance with the directions given to the proxy or attorney to vote on the Resolution in that way; or (b) the Chair of the Meeting as proxy or attorney for a person who is entitled to vote on the Resolution, in accordance with a direction given to the Chair to vote on the Resolution as the Chair decides; or (c) a holder acting solely in a nominee, trustee, custodial or other fiduciary capacity on behalf of a beneficiary provided the following conditions are met: (i)
the beneficiary provides written confirmation to the holder that the beneficiary is not excluded from voting, and is not an Associate of a person excluded from voting, on the Resolution; and
(ii)
Resolution 6
the holder votes on the Resolution in accordance with directions given by the beneficiary to the holder to vote in that way. Voting exclusion statement: The Company will disregard any votes cast in favour of this Resolution by or on behalf of: (a) a person who is eligible to participate in the Catalyst Metals Employee Incentive Plan; or (b) an Associate of that person or those persons. However, this does not apply to a vote cast in favour of the Resolution by: (a) a person as proxy or attorney for a person who is entitled to vote on the Resolution, in accordance with the directions given to the proxy or attorney to vote on the Resolution in that way; (b)
the Chair of the Meeting as proxy or attorney for a person who is entitled to vote on the Resolution, in accordance with a direction given to the Chair to vote on the Resolution as the Chair decides; or
(c)
a holder acting solely in a nominee, trustee, custodial or other fiduciary capacity on behalf of a beneficiary provided the following conditions are met:
-3-
(i)
the beneficiary provides written confirmation to the holder that the beneficiary is not excluded from voting, and is not an associate of a person excluded from voting, on the Resolution; and
(ii)
the holder votes on the Resolution in accordance with directions given by the beneficiary to the holder to vote in that way.
Further, a Restricted Voter who is appointed as a proxy will not vote on the Resolution unless:
Resolution 7
(a)
the appointment specifies the way the proxy is to vote on the Resolution; or
(b)
the proxy is the Chair of the Meeting and the appointment expressly authorises the Chair to exercise the proxy even though the Resolution is connected directly or indirectly with the remuneration of a member of the Key Management Personnel. Shareholders should note that the Chair intends to vote any undirected proxies in favour of the Resolution.
Shareholders may also choose to direct the Chair to vote against the Resolution or to abstain from voting. If any of the persons named above purport to cast a vote other than as permitted above, that vote will be disregarded by the Company (as indicated above) and those persons may be liable for breaching the voting restrictions that apply to them under the Corporations Act. Voting exclusion statement: The Company will disregard any votes cast in favour of the Resolution by or on behalf of: (a)
James Champion de Crespigny (or his nominee) and other persons referred to in Listing Rule 10.14.1, 10.14.2 or 10.14.3 who is eligible to participate in the employee incentive scheme in question; or
(b)
an Associate of those persons.
However, this does not apply to a vote cast in favour of the Resolutions by: (a)
a person as proxy or attorney for a person who is entitled to vote on the Resolutions, in accordance with the directions given to the proxy or attorney to vote on the Resolutions in that way; or
(b)
the Chair of the Meeting as proxy or attorney for a person who is entitled to vote on the Resolutions, in accordance with a direction given to the Chair to vote on the Resolutions as the Chair decides; or
(c)
a holder acting solely in a nominee, trustee, custodial or other fiduciary capacity on behalf of a beneficiary provided the following conditions are met: (i)
the beneficiary provides written confirmation to the holder that the beneficiary is not excluded from voting, and is not an Associate of a person excluded from voting, on the Resolutions; and
(ii)
the holder votes on the Resolutions in accordance with directions given by the beneficiary to the holder to vote in that way.
Further, a Restricted Voter who is appointed as a proxy will not vote on the Resolutions unless: (a)
the appointment specifies the way the proxy is to vote on the Resolutions; or
(b)
the proxy is the Chair of the Meeting and the appointment expressly authorises the Chair to exercise the proxy even though the Resolutions is connected directly or indirectly with the remuneration of a member of the Key Management Personnel. Shareholders should note that the Chair intends to vote any undirected proxies in favour of the Resolutions.
Shareholders may also choose to direct the Chair to vote against the Resolutions or to abstain from voting. If any of the persons named above purport to cast a vote other than as permitted above, that vote will be disregarded by the Company (as indicated above) and those persons may be liable for breaching the voting restrictions that apply to them under the Corporations Act.
By order of the Board Emma Wates Company Secretary Perth, Western Australia 8 October 2026 Proxy appointments A member of the Company who is entitled to attend and vote at the meeting may appoint a proxy to attend and vote for the member at the meeting. A proxy need not be a member of the Company. A Shareholder who is entitled to cast 2 or more votes may appoint 2 proxies and may specify the proportion or number of votes each proxy is appointed to exercise. If the member appoints 2 proxies
-4-
and the appointment does not specify the proportion or number of the member’s votes, then in accordance with Section 249x(3) of the Corporations Act, each proxy may exercise one-half of the votes. A proxy form is provided. If required it should be completed, signed and returned to the Company’s registered office in accordance with the proxy instructions on that form. Voting entitlements In accordance with Regulation 7.11.37 of the Corporations Regulations 2001 (Commonwealth), the directors have determined that the identity of those entitled to attend and vote at the meeting is to be taken as those persons who held Shares in the Company as at 4.00 p.m. (WST) on 10 November 2026.
-5-
CATALYST METALS LIMITED EXPLANATORY MEMORANDUM This Explanatory Memorandum has been prepared to provide information which the Directors believe to be material to Shareholders in deciding whether or not to pass the Resolutions and should be read in conjunction with the accompanying Notice of Meeting. 1.
ANNUAL FINANCIAL REPORT
In accordance with the Corporations Act, the business of the Meeting will include receipt and consideration of the annual financial report of the Company for the year ended 30 June 2026 together with the declaration of the Directors, the Directors’ report, the Remuneration Report and the auditor’s report. The Company will not provide a hard copy of the Company’s annual financial report to Shareholders unless specifically requested to do so. The Company’s annual financial report is available on its website at www.catalystmetals.com.au. There is no requirement for Shareholders to approve these reports. However, time will be allowed during the Meeting for consideration by Shareholders of the financial statements and the associated Directors’ and auditors’ reports. 2.
RESOLUTION 1 – REMUNERATION REPORT
2.1
General
The Remuneration Report is contained in the Directors’ Report section of the Company’s annual report for the year ended 30 June 2026. The Remuneration Report describes the underlying principles and structure of the remuneration policies of the Company and sets out the remuneration arrangements in place for directors and senior executives. Section 250R(2) of the Corporations Act requires that at a listed company’s annual general meeting, a resolution to adopt the remuneration report be put to the vote of shareholders. However, such a resolution is advisory only and not binding on the company or its directors. The Chair of the meeting will give Shareholders a reasonable opportunity to ask questions about, or make comments on, the Remuneration Report. The Directors take the discussion at the meeting and the outcome of the vote into account when considering the Company’s remuneration policies and practices. 2.2
Voting consequences
Under Section 250R(2) of the Corporations Act, a company is required to put to its shareholders a resolution proposing the calling of another meeting of shareholders to consider the appointment of directors of the company (Spill Resolution) if, at consecutive annual general meetings, at least 25% of the votes cast on a remuneration report resolution are voted against adoption of the remuneration report and at the first of those annual general meetings a Spill Resolution was not put to vote. If required, the Spill Resolution must be put to vote at the second of those annual general meetings. If more than 50% of votes cast are in favour of the Spill Resolution, the company must convene a shareholder meeting (Spill Meeting) within 90 days of the second annual general meeting. All of the directors of the company who were in office when the directors' report (as included in the company’s annual financial report for the most recent financial year) was approved, other than the managing director of the company, will need to stand for re-election at the Spill Meeting if they wish to continue as directors.
-6-
Following the Spill Meeting those persons whose election or re-election as directors of the company is approved will be the directors of the company. 2.3
Previous voting result
At the Company’s last annual general meeting held on 13 November 2025, the remuneration report for the financial year ended 30 June 2025 was approved by 83% of Shareholders present and voting. If the Remuneration Report receives a 'no' vote of 25% or more at this Meeting, it will not result in the Company putting a Spill Resolution to Shareholders. However, Shareholders should be aware that if there is a ‘no’ vote of 25% or more at this Meeting, followed by a 'no' vote of 25% or more at the next annual general meeting, the Company will be required to put a Spill Resolution to Shareholders at a Spill Meeting. A voting exclusion applies to this Resolution in the terms set out in the Notice. Shareholders are urged to carefully read the Proxy Form and provide a direction to the proxy on how to vote on this Resolution. 3.
RESOLUTION 2 – RE-ELECTION OF BRUCE KAY AS A DIRECTOR
3.1
General
Clause 6.1(f)(i) of the Constitution requires, in effect, that a Director (other than the Managing Director) must not hold office without re-election for more than 3 years and that one third of the Directors in office (other than a Managing Director or a Director appointed to fill a casual vacancy on the board) must retire by rotation at each annual general meeting of the Company. The retiring Director is then eligible for re-election pursuant to clause 6.1(m)(i) of the Constitution. Mr Bruce Kay, who was last re-elected at the annual general meeting held on 14 November 2024, retires at the Meeting in accordance with Clause 6.1(f)(i) of the Constitution and, being eligible, has offered himself for re-election at the Meeting. 3.2
Qualifications and material directorships
Mr Kay is a qualified geologist and former head of worldwide exploration for Newmont Mining Corporation. He is a highly experienced geologist with a resource industry career spanning more than 30 years in international exploration, mining, geological, project evaluation and corporate operations. Mr Kay previously served as group executive and managing director of exploration at Normandy Mining Limited, where he managed its global exploration program. Mr Kay is an integral member of the Catalyst Board. His technical expertise as a geologist and his knowledge of gold mining operations are valued by the board and shareholders. Along with his expertise as a geologist and years of experience in mining operations, Bruce brings to the Board skills and expertise in Mergers and Acquisitions. Mr Kay has played an important role in the key acquisitions which have defined the Company’s business and strategy to date. Mr Kay has also provided guidance for the management team leading Catalyst’s drilling and exploration programmes. This has been an instrumental part of Catalyst’s recent growth and unlocked significant shareholder value. As 40% of the Board has changed over the past year through the addition of Anna Shave and Mark Connelly, the Board sees retaining Mr Kay as a Director as integral to implementing an orderly Board renewal and succession planning process. As part of this, the Board expects to make initial changes to Board membership in the coming months. If re-elected, Mr Kay is expected not to serve a full term as part of the Board renewal and succession process.
-7-
While Mr Kay has been on the Board for 15 years, he has remained an objective director who consistently participates in and contributes to Board discussions and regularly challenges management. Mr Kay is not considered independent due to prior participation in an employee incentive scheme and financial remuneration received under a consultancy agreement to provide additional technical services to the Company to advise on its geological drilling and exploration programmes. The Board notes that those services were on an arm's-length basis and were more costeffective than obtaining similar services from other third parties. 3.3
Directors’ recommendation
The Board (excluding Mr Kay) recommends that shareholders vote in favour of re-electing Mr Kay as a Director of the Company. The Chair intends to vote all available undirected proxies in favour of Resolution 2. 4.
RESOLUTION 3 – ELECTION OF MARK CONNELLY AS A DIRECTOR
4.1
General
Clause 6.1(e) of the Constitution provides that any Director appointed as a casual vacancy in addition to the existing Directors must retire from office at the next annual general meeting following his or her appointment and is then eligible for re-election pursuant to clause 6.1(m)(i) of the Constitution. ASX Listing Rule 14.4 also provides that each additional director appointed as a casual vacancy during the year is to hold office until the next annual general meeting. Mr Mark Connelly was appointed as an additional Director of the Company on 2 March 2026 and has since served as a Director and Chair of the Company. Mr Connelly has also been appointed as a member of the Company’s Audit and Risk Committee and the Nomination and Remuneration Committee. 4.2
Qualifications and material directorships
Mr Connelly is an internationally experienced mining industry professional with more than 30 years’ experience in the natural resources sector and a strong track record of value creation in the gold industry. He was most recently Non-Executive Chairman of Emmerson Resources Ltd, which Pan African Resources acquired in June 2026 for A$311 million. Mr Connelly was also Non-Executive Chairman of Warriedar Resources Limited, which Capricorn Metals Ltd acquired for approximately A$327 million in November 2025, and Non-Executive Chairman of Alto Metals Limited, which Brightstar Resources Limited acquired for approximately A$80 million in 2024. Mr Connelly currently serves as chairman of Astral Resources NL and Antares Metals Limited. Despite these directorships, Mr Connelly is fully committed to his role on the Catalyst Board, as Astral Resources and Antares Metals are small-cap exploration and mining companies. Those roles do not impede Mr Connelly’s ability to serve as Chair of the Catalyst Board. Earlier in his career, Mr Connelly was Managing Director and Chief Executive Officer of Papillon Resources Limited, where he was instrumental in the US$570 million merger of Papillon with B2Gold Corporation in October 2014. Prior to Papillon, he was Chief Operating Officer of Endeavour Mining Corporation, following its merger with Adamus Resources Limited, where he was Managing Director and Chief Executive Officer. In addition to serving as Board Chair, Mr Connelly serves on the Audit and Risk Committee and the Nomination and Remuneration Committee. For the Audit and Risk Committee he brings significant accounting, finance and commercial management expertise given his substantial financial and commercial experience within the resources sector including earlier career roles in financial and operational management followed by senior executive, CEO and listed company Board roles.
-8-
Mr Connelly has a Bachelor of Accounting & Finance from Edith Cowan University and is a member of the Australia Institute of Company Directors and the Society of Mining, Metallurgy and Exploration. Mr Connelly is considered an Independent Director. 4.3
Directors’ recommendation
The Board (excluding Mr Connelly) recommends that Shareholders vote in favour of the election of Mr Connelly as a Director of the Company. The Chair intends to vote all available undirected proxies in favour of Resolution 3. 5.
RESOLUTION 4 AND 5 – RATIFICATION OF PRIOR ISSUE OF CONSIDERATION SHARES
5.1
General
On 18 February 2026, the Company announced it had entered into binding agreements with Albright Metals Limited (Albright Metals) and Star Minerals Limited (Star Minerals) to acquire each company’s Bryah Basin tenements covering 1,100km2 of exploration tenure. Material terms of the acquisition agreements are outlined below. Albright Agreement The Company, its wholly owned subsidiary Catalyst (Old Highway) Pty Ltd (Catalyst Old Highway) and Albright Metals entered into an asset purchase agreement (Albright Agreement) under which Catalyst Old Highway agreed to acquire Albright Metals’ interests in certain tenements forming part of the Bryah Project (Albright Tenements), together with associated mining information, records, authorisations and contractual rights. The consideration payable under the Albright Agreement was $1.8 million, comprising: •
$1.0 million in cash; and
•
$0.8 million in Shares, calculated using the 5-day VWAP of the Company’s Shares immediately preceding execution of the agreement, resulting in the issue of 105,387 Shares to Albright Metals (Albright Consideration Shares).
As part of the Albright Agreement, Catalyst Old Highway was also granted an exclusive option to acquire Albright Metals' interests in certain additional tenements forming part of the Bryah Project (Albright Option Tenements). The option price is $2.2 million, payable in cash and/or Shares at the Company's discretion, with any Shares issued to be priced by reference to the five trading day VWAP immediately preceding exercise of the option and subject to a maximum of 285,900 Shares. The Albright Agreement therefore provided Catalyst with the ability to acquire approximately 50% of Albright Metals' Bryah Project tenements initially, with an option to acquire the remaining approximately 50%. The acquisition was subject to customary conditions, including obtaining any required Ministerial and third-party consents. The Albright Consideration Shares were issued on 5 March 2026 using the Company’s existing placement capacity under Listing Rule 7.1. Star Agreement The Company, Catalyst Old Highway and Star Minerals entered into an asset purchase agreement (Star Agreement) under which Catalyst Old Highway agreed to acquire Star Minerals' West Bryah Project tenements (Star Tenements), together with associated mining information, records, authorisations and contractual rights The consideration payable for the acquisition under the Star Agreement was $2.75 million, comprising:
-9-
•
$1.0 million in cash; and
•
$1.75 million in Shares, calculated using the 5-day VWAP of the Company’s Shares immediately preceding execution of the agreement, resulting in 230,536 Shares being issued to Star Minerals (Star Consideration Shares).
The Star Agreement also formed part of a broader transaction under which the Company agreed to subscribe for $1.0 million of fully paid ordinary shares in Star Minerals at an issue price of $0.064 per Star Minerals share. In connection with the transaction, the Company and Star Minerals also entered into a toll treatment arrangement under which Catalyst agreed to make available excess capacity at its Plutonic processing plant for the processing of up to 250,000 tonnes of ore over two years from Star Minerals' Tumblegum South Project. The Company also received approximately 11.1 million fiveyear options in Star Minerals, exercisable at $0.0806 per share. The acquisition was subject to customary conditions, including obtaining any required Ministerial and third-party consents. The Star Consideration Shares were issued on 18 March 2026 using the Company’s existing placement capacity under Listing Rule 7.1. The Resolutions propose that Shareholders ratify the prior issue of the Albright Consideration Shares and the Star Consideration Shares (together the Consideration Shares). 5.2
ASX Listing Rule 7.1
Broadly speaking, and subject to a number of exceptions, Listing Rule 7.1 limits the amount of equity securities that a listed company can issue without the approval of its shareholders over any 12-month period to 15% of the fully paid ordinary securities it had on issue at the start of that period. The issue of the Consideration Shares does not fit within any of the exceptions to Listing Rule 7.1 and, as it has not been approved by the Company’s Shareholders, it effectively uses up part of the 15% limit in Listing Rule 7.1, reducing the Company’s capacity to issue further equity securities without Shareholder approval under Listing Rule 7.1 for the 12-month period following the date the Company issued the Consideration Shares. 5.3
ASX Listing Rule 7.4
Listing Rule 7.4 allows the shareholders of a listed company to approve an issue of equity securities after it has been made or agreed to be made. If they do, the issue is taken to have been approved under Listing Rule 7.1 and so does not reduce the Company’s capacity to issue further equity securities without Shareholder approval under Listing Rule 7.1. The Company wishes to retain as much flexibility as possible to issue additional equity securities into the future without having to obtain Shareholder approval for such issues under Listing Rule 7.1. Therefore, by Resolution 4 and 5, the Company seeks Shareholder approval to ratify the issue of Consideration Shares for the purposes of Listing Rule 7.4. If Resolution 4 is passed, the issue of Albright Consideration Shares will be excluded in calculating the Company’s 15% capacity to issue equity securities under Listing Rule 7.1 without Shareholder approval over the 12-month period following date the Company issued the Albright Consideration Shares. If Resolution 4 is not passed, the issue of Albright Consideration Shares will be included in calculating the Company’s 15% capacity to issue equity securities under Listing Rule 7.1 without Shareholder approval over the 12-month period following the date the Company issued the Albright Consideration Shares. If Resolution 5 is passed, the issue of Star Consideration Shares will be excluded in calculating the Company’s 15% capacity to issue equity securities under Listing Rule 7.1 without Shareholder approval over the 12-month period following date the Company issued the Star Consideration Shares. If Resolution 5 is not passed, the issue of Star Consideration Shares will be included in calculating the
- 10 -
Company’s 15% capacity to issue equity securities under Listing Rule 7.1 without Shareholder approval over the 12-month period following the date the Company issued the Star Consideration Shares. The following information is provided to Shareholders for the purposes of Listing Rule 7.4. (a)
The Company issued the: i.
Albright Consideration Shares to Albright Metals; and
ii.
Star Consideration Shares to Star Minerals,
neither company is a related party of the Company, member of the Company’s Key Management Personnel, substantial holder of the Company, adviser of the Company or an associate of any of these parties; and (b)
The Company issued i.
105,387 Shares to Albright Metals pursuant to Listing Rule 7.1 (ratification of which is sought under Resolution 4); and
ii.
230,536 Shares to Star Minerals pursuant to Listing Rule 7.1 (ratification of which is sought under Resolution 5); and
(c)
The Consideration Shares were fully paid on issue and rank equally in all aspects with all existing fully paid ordinary shares previously on issue in the Company.
(d)
The Albright Consideration Shares were issued on 5 March 2026 and the Star Consideration Shares were issued on 18 March 2026.
(e)
The Consideration Shares were issued at a deemed issue price of $7.591 per Share in part consideration for the acquisition of the Bryah Basin tenements from Albright Metals and Star Minerals, no funds were raised from the issue.
(f)
A summary of the material terms of the Albright Agreement and Star Agreement is outlined in Section 5.1.
(g)
A voting exclusion statement is included for this Resolution.
5.4
Directors’ recommendation
The Board recommends that Shareholders vote in favour of the ratification of Consideration Shares. The Chair intends to vote all available undirected proxies in favour of Resolutions 4 and 5. 6.
RESOLUTION 6 – APPROVAL TO ISSUE SECURITIES TO UNRELATED PARTIES UNDER THE COMPANY’S EMPLOYEE SECURITIES INCENTIVE PLAN
6.1
Background
Resolution 6 seeks Shareholder approval for the purposes of Listing Rule 7.2 (Exception 13(b)) for the issue up to a maximum of 13,000,000 equity securities under the Company’s employee incentive plan titled “Catalyst Employee Incentive Plan” (Plan). The objective of the Plan is to attract, motivate and retain key employees and the Company considers the future issue of equity securities under the Incentive Plan will provide selected employees with the opportunity to participate in the future growth of the Company.
- 11 -
6.2
Listing Rule 7.1 and Listing Rule 7.2 Exception 13(b)
Listing Rule 7.1 is summarised in Section 5.2 above. Listing Rule 7.2 (Exception 13(b)) provides that Listing Rule 7.1 does not apply to an issue of securities under an employee incentive scheme if, within three years before the date of issue of the securities, the holders of the entity’s ordinary securities have approved the issue of equity securities under the scheme as exception to Listing Rule 7.1. Exception 13(b) is only available if and to the extent that the number of equity securities issued under the scheme does not exceed the maximum number set out in the entity’s notice of meeting dispatched to shareholders in respect of the meeting at which shareholder approval was obtained pursuant to Listing Rule 7.2 (Exception 13(b)). Exception 13(b) also ceases to be available if there is a material change to the terms of the scheme from those set out in the notice of meeting. If Resolution 6 is passed, the Company will be able to issue an increased number of Securities under the Incentive Plan to eligible participants over a period of 3 years from the date of the Meeting. The issue of any Securities to eligible participants under the Incentive Plan (up to the proposed maximum number of Securities stated in below) will be excluded from the calculation of the number of Equity Securities that the Company can issue without Shareholder approval under Listing Rule 7.1. For the avoidance of doubt, the Company must seek Shareholder approval under Listing Rule 10.14 in respect of any future issues of Securities under the Plan to a related party or a person whose relationship with the Company or the related party is, in ASX’s opinion, such that approval should be obtained. If Resolution 6 is not passed, the Company will not be able to issue an increased number of Securities under the Incentive Plan to eligible participants, and any issues of Securities will reduce, to that extent, the Company’s capacity to issue equity securities without Shareholder approval under Listing Rule 7.1 for the 12 month period following the issue of those securities. 6.3
Technical information required by Listing Rule 7.2 (Exception 13) REQUIRED INFORMATION
DETAILS
Terms of the Plan
A summary of the material terms and conditions of the Plan is set out in Annexure A.
Number of Securities previously issued under the Incentive Plan
The Company has issued 10,564,635 equity securities under the Plan since the Plan was approved on 17 November 2023.
Maximum number of Securities proposed to be issued under the Incentive Plan
The maximum number of Securities proposed to be issued under the Plan in reliance on Listing Rule 7.2 (Exception 13), during the three year period following Shareholder approval, is 13,000,000 equity securities. It is not envisaged that the maximum number of Securities for which approval is sought will be issued immediately. The Company may also seek Shareholder approval under Listing Rule 10.14 in respect of any future issues of Securities under the Plan to a related party or a person whose relationship with the Company or the related party is, in ASX’s opinion, such that approval should be obtained.
Voting exclusion statement
A voting exclusion statement applies to this Resolution.
Voting prohibition statement
A voting prohibition statement applies to this Resolution.
- 12 -
RESOLUTION 7– APPROVAL TO ISSUE FY27 LTI PERFORMANCE RIGHTS TO JAMES CHAMPION DE CRESPIGNY (OR HIS NOMINEE)
7.1
Background
The Board proposes to issue 130,890 long term incentive performance rights (FY27 LTI Performance Rights) to Mr Champion de Crespigny (or his nominee) as a security-based incentive component of his remuneration for the financial year commencing 1 July 2026. The FY27 LTI Performance Rights are to be granted under the Plan. Under the terms of his executive employment arrangements with the Company, Mr Champion de Crespigny is entitled each year to: •
a STI bonus of up to 100% of his total fixed remuneration based on the achievement of predetermined milestones and key performance indicator targets. The structure of the STI awards provides for 100% of any STI bonus to be paid in cash; and
•
LTI securities of up to 100% of total fixed remuneration to be satisfied through the issue of LTI performance rights with pre-determined milestones and targets to be achieved over a threeyear period.
The Company is proposing to issue 130,890 FY27 LTI Performance Rights as the long-term incentive (LTI) component of Mr Champion de Crespigny’s remuneration for the financial year commencing 1 July 2026. Mr Champion de Crespigny is entitled to an annual allocation up to 100% of total fixed remuneration, equal to $750,000 inclusive of superannuation for the financial year commencing 1 July 2026, which is to be satisfied by the issue of FY27 LTI Performance Rights with pre-determined milestones and targets over a three-year period. The number of FY27 LTI Performance Rights is determined by dividing the FY27 LTI entitlement by the allocation price of $5.73, being the VWAP of the Company’s Shares in the 90 days preceding the commencement of the measurement period, being 1 July 2026. The FY27 LTI Performance Rights will only vest and convert into shares subject to the achievement of the long-term key performance indicators set for the three-year period from 1 July 2026 to 30 June 2029 (FY27 LTI Performance Period) and service condition being that Mr Champion de Crespigny remains employed by the Company as at 30 June 2029. The FY27 LTI Performance Rights to be issued to Mr Champion de Crespigny are on the same terms as performance rights to be issued to other senior management under the Plan for their FY27 securitybased incentive entitlements. If Resolution 7 is passed, the Company will be able to proceed with the issue of the FY27 LTI Performance Rights to Mr Champion de Crespigny. If Resolution 7 is not passed, the FY27 LTI Performance Rights will not be issued and, since the FY27 LTI Performance Rights form part of Mr Champion de Crespigny’s remuneration arrangements, the Board will need to consider alternative arrangements to appropriately remunerate and incentivise Mr Champion de Crespigny in his role as Managing Director and Chief Executive Officer of the Company (including the payment of cash in lieu of the FY27 LTI Performance Rights). 7.2
Key terms of FY27 LTI Performance Rights
7.2.1
FY27 LTI Performance Rights – Vesting Conditions
The FY27 LTI Performance Rights will vest and convert into shares subject to the achievement of the:
- 13 -
• •
long term key performance indicators set for the three-year period from 1 July 2026 to 30 June 2029; and service condition being that Mr Champion de Crespigny remains employed by the Company as at 30 June 2029.
The long-term performance indicators for three-year period ended 30 June 2029 comprise Reserve Growth and Relative Total Shareholder Return. These two components are weighted 50% each and are applied to the percentage of total fixed remuneration. The near-term strategic objective of Catalyst is to define sufficient Ore Reserves to underpin a long term, increased production rate at the Plutonic Gold Belt. The Board considers that achieving this objective will be the primary driver of value for Catalyst’s shareholders at this time. Failing to invest in the long-term future of the mine will only serve to maximise short term profits and not long-term gains. Reserve Growth and Relative Total Shareholder Return are considered appropriate financial KPIs against which to reward executives. Reserve Growth Reserve growth will be tested for vesting based on growth in the Company’s Ore Reserves (Proved and Probable) during the three-year period ended 30 June 2029, in accordance with the following scale: Reserve growth over FY27 LTI Performance Period
Percentage of FY27 LTI Performance Rights that vest¹
Negative Reserve growth (threshold)
Nil
Depletion replacement (target)
50%
Depletion replacement +10% Reserve growth (stretch)
100%
¹ Straight line vesting will occur between target and stretch performance.
Relative Total Shareholder Return (RTSR) RTSR will be tested for vesting based on an assessment of the achievement of the Company’s RTSR compared to a comparator group of 13 peers¹ outlined below in accordance with the following scale: RTSR over FY27 LTI Performance Period
Percentage of FY27 LTI Performance Rights that vest2
<Median (Threshold)
Nil
Median (Target)
50%
= 75th Percentile (Stretch)
100%
¹ Comparator peer group includes: Bellevue Gold Ltd, Black Cat Syndicate Ltd, AIC Mines Limited, St Barbara Limited, Pantoro Limited, Ora Banda Limited, Alkane Resources Limited, Westgold Resources Limited, Vault Minerals Limited, Regis Resources Limited, Genesis Minerals Limited, Capricorn Metals Limited, Ramelius Resources Ltd. Where a peer is no longer publicly trading, that entity is removed from the peer group. 2 Straight line vesting will occur between target and stretch performance.
- 14 -
7.2.2
FY27 LTI Performance Rights - General terms and conditions
A summary of the Catalyst Employee Incentive Plan is provided in Annexure A and the other material terms of the FY27 LTI Performance Rights are outlined in Annexure B. 7.3
ASX Listing Rule 10.14 and 10.15
ASX Listing Rule 10.14 states that a listed company must not permit a director to acquire securities under an employee incentive scheme without the approval of shareholders by ordinary resolution. Mr Champion de Crespigny is a Director of the Company. Accordingly, Shareholder approval is being sought under Listing Rule 10.14 for the issue of FY27 LTI Performance Rights to Mr Champion de Crespigny. The following information is provided to Shareholders for the purposes of Listing Rule 10.15: (a)
the FY27 LTI Performance Rights will be issued to Mr Champion de Crespigny (or his nominee), being a Director of the Company (or his nominee);
(b)
the maximum number of FY27 LTI Performance Rights to be issued is 130,890 and the maximum number of Shares to be issued upon vesting and exercise of the FY27 LTI Performance Rights is 130,890;
(c)
the FY27 LTI Performance Rights will be granted for nil consideration and the Shares to be issued upon vesting of the FY27 LTI Performance Rights will be issued for nil consideration. Accordingly, no loan has been or will be given to Mr Champion de Crespigny in relation to the grant of FY27 LTI Performance Rights and no funds will be raised from the issue or vesting of the FY27 LTI Performance Rights;
(d)
the FY27 LTI Performance Rights have an expiry date of 30 June 2029;
(e)
Mr Champion de Crespigny’s remuneration as Managing Director comprises: i.
$750,000 per annum (inclusive of superannuation) for the financial year ending 30 June 2027.
ii.
a short term incentive cash performance bonus payment of up to 100% of total fixed remuneration in line with the Company’s policies from time to time, subject to satisfaction of pre-determined milestones and key performance indicator targets;
iii.
long term incentive of a cash or securities performance bonus in line with the Company’s policies from time to time, subject to satisfaction of performance hurdles outlined in Section 7.2 and any Shareholder approval that is required, with long term incentives including the issue of the FY27 LTI Performance Rights the subject of Resolution 7
(f)
4,478,946 Performance Rights have previously been issued under the current Plan to Mr Champion de Crespigny. These Performance Rights have been issued for nil cash consideration and are an equity based component of Mr Champion de Crespigny’s remuneration package for prior years of service to the Company
(g)
the material terms of the FY27 Performance Rights are set out in Section 7.2 and Annexure B. The Company has elected to grant the FY27 LTI Performance Rights to Mr Champion de Crespigny inclusive of the following reasons:
the FY27 LTI Performance Rights are unquoted and are subject to vesting conditions which align with the Company’s key long term objectives and the grant of FY27 LTI Performance Rights has no immediate dilutionary impact on Shareholders;
-
15 -
the issue of the FY27 LTI Performance Rights to Mr Champion de Crespigny will further align the interests of Mr Champion de Crespigny with those of shareholders and are intended to incentivise and motivate Mr Champion de Crespigny to exceed expectations and to focus on the Company’s longer term objectives;
the issue of the FY27 LTI Performance Rights are a reasonable and appropriate method to provide cost effective remuneration as the non-cash form of this benefit will allow the Company to spend a greater proportion of its cash reserves on its operations rather than if alternative cash forms of remuneration were provided to Mr Champion de Crespigny; and
it is not considered that there are any significant opportunity costs to the Company or benefits foregone by the Company in granting the FY27 LTI Performance Rights on the terms proposed.
(h)
details of any FY27 LTI Performance Rights issued under the Plan will be published in each annual report of the Company relating to a period in which Performance Rights have been issued and that approval for the issue of FY27 LTI Performance Rights was obtained, if required, under Listing Rule 10.14;
(i)
any additional person covered by Listing Rule 10.14 who becomes entitled to participate in an issue of securities under the Plan will not participate until approval is obtained under that Listing Rule;
(j)
the Company has internally valued each FY27 LTI Performance Right to be granted to Mr Champion de Crespigny (or his nominee) under Resolution 7 at $5.73 per FY27 LTI Performance Right, which was the VWAP of the Company’s Shares in the 90 days preceding the commencement of the measurement period, being 1 July 2026. The total value is therefore $750,000. Any change in the Share price between the date of the valuation and the date the FY27 LTI Performance Rights are granted would have an impact on their value;
(k)
a summary of the material terms of the Plan is set out in Annexure A to this notice of meeting;
(l)
the FY27 LTI Performance Rights are anticipated to be issued within one month of the meeting but will be issued no later than 3 years after the meeting (or such later date as permitted by any ASX waiver or modification of the Listing Rules); and
(m) a voting exclusion statement is included in the notice of meeting. 7.4
ASX Listing Rule 7.1
If Shareholders approve Resolution 7 pursuant to Listing Rule 10.14, then approval is not required for the purposes of Listing Rule 7.1. Accordingly, if Resolution 7 is approved and the 130,890 FY27 LTI Performance Rights are issued, these will not be included in the calculation of the Company’s 15% annual placement capacity pursuant to Listing Rule 7.1. 7.5
Corporations Act – Chapter 2E
Chapter 2E of the Corporations Act prohibits the Company from giving a financial benefit to a Related Party of the Company (which includes a Director) unless either: (a) the giving of the financial benefit falls within one of the exceptions to the provisions; or (b) Shareholder approval is obtained to the giving of the financial benefit. The issue by the Company of the FY27 LTI Performance Rights and the issue of Shares on exercise of any vested FY27 LTI Performance Rights to Mr Champion de Crespigny (or his nominee) constitutes
- 16 -
the giving of a financial benefit to a Related Party of the Company for the purposes of Chapter 2E of the Corporations Act. However, the Directors (other than Mr Champion de Crespigny) have determined that the proposed issue of FY27 LTI Performance Rights constitutes reasonable remuneration given the circumstances of the Company and the position held by Mr Champion de Crespigny. Accordingly, the proposed issue of the FY27 LTI Performance Rights to Mr Champion de Crespigny (or his nominee) falls within the “reasonable remuneration” exception set out in Section 211 of the Corporations Act so that shareholder approval is not required for the purposes of Chapter 2E of the Corporations Act. 7.6
Corporations Act – Sections 200B and 200E
The Corporations Act restricts the benefits that can be given to persons who hold a “managerial or executive office” (as defined in the Corporations Act) on leaving their employment with the Company or any of its related bodies corporate. Under Sections 200B and 200E of the Corporations Act, a company may only give a person a benefit in connection with them ceasing to hold a managerial or executive office if the benefit is approved by shareholders or an exemption applies. The term “benefit” has a wide meaning and may include benefits resulting from the accelerated vesting of the FY27 LTI Performance Rights on termination of employment or the Board exercising certain discretions under the terms of Mr Champion de Crespigny’s long term incentive entitlements. Under the terms of the FY27 LTI Performance Rights, if Mr Champion de Crespigny’s employment is terminated during the vesting periods for these securities for any reason other than for cause or due to his resignation, all unvested Performance Rights may vest and become exercisable. This accelerated vesting is a termination benefit. Under the terms of the Plan, the Board may also exercise its discretion to accelerate vesting if deemed appropriate, including in connection with a termination. If Resolution 7 is approved, Shareholders will be considered to have approved the giving of that termination benefit in connection with Mr Champion de Crespigny ceasing office for the purposes of Sections 200B and 200E of the Corporations Act. 7.7
ASX Listing Rule 10.19
Listing Rule 10.19 requires that, without shareholder approval, a company must ensure that no officer of the company or any of its child entities will be, or may be, entitled to termination benefits if the value of those benefits and the termination benefits that are, or may become, payable to all other officers together exceed 5% of the equity interests of the company as set out in the latest accounts of the company lodged with ASX under the Listing Rules. For the avoidance of doubt, the Company confirms it will comply with the requirements of Listing Rule 10.19 in the event of Mr Champion de Crespigny ceasing office as a director and officer of the Company. 7.8
Directors’ recommendations
Each of the Directors (excluding Mr Champion de Crespigny) believes that the approval in relation to the issue of the FY27 LTI Performance Rights to Mr Champion de Crespigny (or his nominee) is in the best interests of Shareholders as a whole. The Directors (excluding Mr Champion de Crespigny) recommend that shareholders vote in favour of Resolution 7. The Chair of the meeting intends to vote all available proxies in favour of Resolution 7.
- 17 -
RESOLUTION 8: RENEWAL OF PROPORTIONAL TAKEOVER PROVISIONS
8.1
General
A proportional takeover bid is a takeover bid where the offer made to each shareholder is only for a proportion of that shareholder’s shares. Pursuant to section 648G of the Corporations Act, an entity may include a provision in its constitution whereby a proportional takeover bid for shares may only proceed after the bid has been approved by a meeting of shareholders held in accordance with the terms set out in the Corporations Act. In accordance with section 648G(1) of the Corporations Act, such clause will cease to apply at the end of three years from the incorporation of the Company, insertion of the clause or renewal of the clause (as appropriate) unless otherwise specified. When this clause ceases to apply, the constitution will be modified by omitting the clause. A company may renew its proportional takeover approval provisions in the same manner in which a company can modify its constitution (i.e. by special resolution of shareholders). The Company’s Constitution (including the proportional takeover provisions set out in clause 14) was adopted on 17 November 2023. The proportional takeover provisions contained in clause 14 of the Constitution will expire and cease to apply on 17 November 2026 (being three years since the Constitution was adopted on 17 November 2023). This Resolution is a special resolution which will enable the Company to modify its Constitution by renewing clause 14 of the Constitution for a period of three years from the date of Shareholder approval under section 648G(4) of the Corporations Act. It is noted the Shareholder approval will not result in a change to the wording of clause 14 of the Constitution. The Company is permitted to seek further Shareholder approval to renew this clause for further periods of up to three years on each occasion. A copy of the Constitution was released to the ASX on 17 November 2023 and is available for download from the Company’s ASX announcements platform. 8.2
Technical information required by section 648G(5) of the Corporations Act
Overview
A proportional takeover bid is a takeover bid where the offer made to each shareholder is only for a proportion of that shareholder’s shares. Pursuant to section 648G of the Corporations Act, the Company has included in the Constitution a provision whereby a proportional takeover bid for Shares may only proceed after the bid has been approved by a meeting of Shareholders held in accordance with the terms set out in the Corporations Act. This clause of the Constitution will cease to have effect on the third anniversary of the date of the adoption of last renewal of the clause.
Effect of proposed proportional takeover provisions
Where offers have been made under a proportional off-market bid in respect of a class of securities in a company, the registration of a transfer giving effect to a contract resulting from the acceptance of an offer made under such a proportional off-market bid is prohibited unless and until a Resolution to approve the proportional off-market bid is passed.
Reasons for proportional takeover provisions
A proportional takeover bid may result in control of the Company changing without Shareholders having the opportunity to dispose of
- 18 -
all their Shares. By making a partial bid, a bidder can obtain practical control of the Company by acquiring less than a majority interest. Shareholders are exposed to the risk of being left as a minority in the Company and the risk of the bidder being able to acquire control of the Company without payment of an adequate control premium. These amended provisions allow Shareholders to decide whether a proportional takeover bid is acceptable in principle and assist in ensuring that any partial bid is appropriately priced. Knowledge of any acquisition proposals
As at the date of this Notice, no Director is aware of any proposal by any person to acquire, or to increase the extent of, a substantial interest in the Company.
Potential advantages and disadvantages of proportional takeover provisions
The Directors consider that the proportional takeover provisions have no potential advantages or disadvantages for them and that they remain free to make a recommendation on whether an offer under a proportional takeover bid should be accepted. The potential advantages of the proportional takeover provisions for Shareholders include: (a) the right to decide by majority vote whether an offer under a proportional takeover bid should proceed; (b) assisting in preventing Shareholders from being locked in as a minority; (c) increasing the bargaining power of Shareholders which may assist in ensuring that any proportional takeover bid is adequately priced; and (d) each individual Shareholder may better assess the likely outcome of the proportional takeover bid by knowing the view of the majority of Shareholders which may assist in deciding whether to accept or reject an offer under the takeover bid. The potential disadvantages of the proportional takeover provisions for Shareholders include: (a) proportional takeover bids may be discouraged; (b) lost opportunity to sell a portion of their Shares at a premium; and (c) the likelihood of a proportional takeover bid succeeding may be reduced.
Recommendation of the Board
The Directors do not believe the potential disadvantages outweigh the potential advantages of adopting the proportional takeover provisions and as a result consider that the proportional takeover provision in the Constitution is in the interest of Shareholders and unanimously recommend that Shareholders vote in favour of this Resolution.
- 19 -
GLOSSARY OF TERMS “Albright Consideration Shares” has the meaning given in Section 5.1. “Albright Metals” means Albright Metals Limited. “Associate” has the meaning given to that term in the ASX Listing Rules. “ASX” means ASX Limited. “ASX Listing Rules” or “Listing Rules” means the official listing rules of the ASX. “Board” means the board of directors of the Company. “Chair” means the Chair of the Meeting. “Change of Control Event” occurs where: (a) an offer is made for Shares pursuant to a takeover bid under Chapter 6 of the Corporations Act and is, or is declared, unconditional with acceptances from shareholders holding at least 50% of the Shares on issue; or (b) the Court sanctions under Part 5.1 of the Corporations Act a compromise or arrangement relating to the Company or a compromise or arrangement proposed for the purposes of or in connection with a scheme for the reconstruction of the Company or its amalgamation with any other company or companies; or (c) any other merger, consolidation or amalgamation involving the Company occurs which results in the holders of Shares immediately prior to the merger, consolidation or amalgamation being entitled to 50 per cent or less of the voting shares in the body corporate resulting from the merger, consolidation or amalgamation; or (d) any Group Company (being the Company or a related body corporate) or Group Companies enter into agreements to sell the main business undertaking or the principal assets (whether or not in the form of shares in a Group Company) of the Group to a person, or a number of persons, none of which are Group Companies and those agreements become unconditional; or (e) the Board determines in its reasonable opinion, control of the Company has or is likely to change or pass to one or more persons, none of which are Group Companies. “Closely Related Party” is defined in the Corporations Act and includes a spouse, dependant and certain other close family members, as well as any companies controlled by a member of Key Management Personnel. “Company” or “Catalyst” means Catalyst Metals Limited (ABN 54 118 912 495) “Consideration Shares” has the meaning given in Section 5.1. “Constitution” means the constitution of the Company. “Corporations Act” means the Corporations Act 2001 (Commonwealth). “Director” means a director of the Company. “Explanatory Memorandum” means the explanatory memorandum accompanying this Notice. FY27 LTI Performance Rights means the Performance Rights proposed to be issued under the Plan on the terms and conditions in Section 7 and Annexure B.
- 20 -
“Key Management Personnel” or “KMP” means those persons having authority and responsibility for planning, directing and controlling the activities of the Company directly or indirectly, including any director (whether executive or otherwise) of the Company. “LTI” means long term incentive. “Meeting” means the annual general meeting convened by the Notice. “Notice” or “Notice of Meeting” means this Notice of Annual General Meeting. “Performance Right” means a right to subscribe for a Share. “Plan” means the Catalyst Metals Employee Incentive Plan approved by shareholders at the annual general meeting held on 17 November 2023. “Remuneration Report” means the remuneration report set out in the annual report for the year ended 30 June 2026. “Restricted Voter” means Key Management Personnel and their Closely Related Parties as at the date of the Meeting. “Share” means an ordinary fully paid share in the capital of the Company. “Shareholder” means a registered holder of Shares. “Spill Meeting” has the meaning given in Section 2.2. “Spill Resolution” has the meaning given in Section 2.2. “Star Consideration Shares” has the meaning given in Section 5.1. “Star Minerals” means Star Minerals Limited. “STI” means short term incentive.
- 21 -
ANNEXURE A - EMPLOYEE INCENTIVE PLAN Outlined below is a summary of the key terms of the Catalyst Metals Limited Employee Incentive Plan. 1.
Eligibility: Eligible Employees include directors (both executive and non-executive), full time and part time employees and casual employees, consultants and contractors of the Company. Subject to the Board’s consent, an Eligible Employee may nominate another person to participate in the Plan in their place.
Administration of Plan: The Board is responsible for the operation of the Plan and has a broad discretion to determine which Eligible Employees will be offered awards under the Plan.
Invitation: The Board may issue an invitation to an Eligible Employee to participate in the Plan (Invitation). The Invitation will specify: a) b) c) d) e) f)
the number and type of awards (being options, performance rights and/or incentive shares) specified in the Invitation; any vesting conditions, performance hurdles, performance period, exercise conditions and/or restriction conditions attaching to the awards; the issue price or exercise price of the awards (as applicable); an acceptance period; any other terms and conditions attaching to the awards; and any other information required by the Listing Rules or any law to be included in the Invitation.
Issue and exercise price: a) Options shall be issued for nil cash consideration, and the Board may determine the exercise price in its absolute discretion (including whether to offer the Eligible Employee a cashless exercise facility which will entitle the Eligible Employee to set-off the exercise price against the number of Shares which the Eligible Employee is entitled to receive upon exercise of the Eligible Employee’s Options); b) Performance rights shall be issued for nil cash consideration, and Shares issued upon the conversion of performance rights shall be issued for nil cash consideration; c) The Board shall determine the issue price of any fully paid or partly paid ordinary shares issued under the Plan, which may be nil.
Quotation on ASX: The Company will apply for fully paid or partly paid ordinary shares issued under the Plan and upon the exercise of options and performance rights to be admitted to trading on ASX upon issue of the Share. Quotation will be subject to the ASX Listing Rules and any holding lock applying to the shares. Options and performance rights issued under the Plan shall not be quoted.
Rights attaching to Shares: Each share issued under the Plan or on the exercise of an award shall be issued on the same terms and conditions as the Company’s issued shares (other than in respect of transfer restrictions imposed by the Plan) and will rank equally with all other issued shares from the issue date except for entitlements which have a record date before the issue date. The holder of a share issued under the Plan shall be entitled to receive notice of, and attend and vote at, shareholder meetings, and to receive any dividends declared by the Company. If any partly paid ordinary shares are issued on the Plan, until all amounts on the partly paid shares are fully paid, the rights to vote and to any dividend payment attaching to the partly paid shares will proportionate to the amount paid up relative to the total amount paid up and payable on the partly paid shares.
Rights attaching to options and performance rights: Subject to the terms of the Plan, the Board may determine the rights attaching to the options and performance rights issued under the
- 22 -
Plan. The holder of an option or performance right issued under the Plan shall not be entitled to receive notice of, and attend and vote at, shareholder meetings, nor to receive any dividends declared by the Company. 8.
Restriction conditions: Shares may be subject to restriction conditions (such as a period of employment or a performance hurdle) which must be satisfied before the Shares can be sold, transferred, or encumbered (Restriction Condition). The Board may waive Restriction Conditions in its absolute discretion, including where a holder dies or is a “good leaver”. The Company is authorised to impose a holding lock on the Shares to implement these restrictions.
No transfer: shares issued under the Plan or any beneficial or legal interest in awards may not be transferred, encumbered or otherwise disposed of, or have a Security Interest granted over them, by a Participant unless: a)
all Restriction Conditions (if any) have been satisfied or waived by the Board;
b)
the prior consent of the Board is obtained which consent may impose such reasonable terms and conditions on such transfer, encumbrance or disposal as the Board sees fit; or
c)
by force of law upon death to the Participant’s legal personal representative or upon bankruptcy to the Participant’s trustee in bankruptcy.
- Forfeiture of shares: Where a Restriction Condition in relation to shares is not satisfied by the due date, or becomes incapable of satisfaction (as determined by the Board in its reasonable opinion), and is not waived by the Board, the holder of those shares forfeits its right, entitlement and interest in and to the shares and the Company must, unless the Restriction Condition is waived by the Board, either: a)
b)
arrange to buy back and cancel the relevant shares within 6 months of the date the Restriction Condition was not satisfied (or became incapable of satisfaction) under the Corporations Act at a price equal to the cash consideration paid by the holder for the shares; or arrange to sell the shares on behalf of the holder (using a power of attorney) as soon as reasonably practicable after the Restriction Condition was not satisfied (or became incapable of satisfaction) on the ASX or to an investor who falls within an exemption under Section 708 of the Corporations Act (provided that the sale must be at a price that is no less than 80% of the volume weighted average price of shares on ASX over the 10 trading days before the sale date), and apply the sale proceeds in the following priority: firstly, to use towards repaying any cash consideration paid by the holder for the shares; and − secondly, any remainder to the Company to cover its costs of managing the Plan. −
- Power of Attorney: The holder irrevocably appoints each of the Company and each director of the Company severally as his or her attorney to do all things necessary to give effect to the buy back or sale of the holder’s shares in accordance with the Plan.
- Ceasing to be an Eligible Employee: If an Eligible Employee ceases to be an employee or director of the Company and: a) b)
at that time there are unfulfilled Restriction Conditions in relation to shares under the Plan held by the Eligible Employee or his or her nominee, the shares are forfeited and the Company must either buy back or sell the shares in accordance with the Plan; the termination of employment or engagement is due to wilful misconduct, gross negligence or material breach of employment contract (Misconduct), then unvested awards shall lapse and the Board may determine that vested awards that have not been exercised shall also lapse; and
- 23 -
c)
the termination of employment or engagement is not due to Misconduct, then vested awards may be exercised within 6 months from the date of termination of employment, and the Board may in its discretion determine whether to waive any vesting conditions, exercise conditions or restriction conditions to permit the Eligible Employee to exercise awards or sell or retain Plan shares or other securities.
- Change of control events: To ensure there is alignment between shareholders, Boards and Management, unvested awards shall immediately vest and become exercisable if the below conditions are met. It is the Board’s view that without alignment, Board and management may not act in the best interests of shareholders in change of control events as they typically result in their own positions being made redundant. As such, to allow shareholders a say in change of control situations, and to ensure management do not become obstructive in the process, the Board has taken steps to align collective interests., a) b)
c)
(Takeover) a takeover bid for the Company’s issued shares is declared unconditional; (Compromise or Arrangement): a court approves under Section 411(4)(b) of the Corporations Act a proposed compromise or arrangement for the purposes of or in connection with a scheme for the reconstruction of the Company or its amalgamation with any other company or companies; or (Sale of main business): the Company enters into an agreement to sell its main business undertaking or principal assets and that agreement becomes unconditional.
- Plan limit: The Company must take reasonable steps to ensure that the number of shares to be received on the exercise of awards for consideration, when aggregated with: a) b)
The number of shares that would be issued if each outstanding offer made or awards for consideration granted under the Plan or any other employee incentive scheme of the Company were to be exercised or accepted; and the number of shares issued during the previous 3 years under the Plan (or any other employee share scheme extended only to eligible employees),
does not exceed 5% of the total number of shares on issue at the time of an offer (but disregarding any offer of shares or awards that can be disregarded in accordance with relevant laws, including offers or awards for no consideration).
- 24 -
ANNEXURE B – PERFORMANCE RIGHTS – GENERAL TERMS AND CONDITIONS The other material terms and conditions of the FY27 LTI Performance Right ( Performance Rights) are: (a)
is not transferable (and will not be quoted on ASX);
(b) does not confer any right to vote (except as otherwise required by law); (c)
does not confer any right to a dividend, whether fixed or at the discretion of directors;
(d) does not confer any right to a return of capital, whether on a winding up, upon a reduction of capital or otherwise; (e) does not confer any right to participate in a surplus profit or assets of the Company on a winding up; (f)
does not confer any rights to participate in an issue of securities such as bonus issues or entitlement issues,
unless and until the applicable vesting conditions are achieved and the Performance Right has converted into a Share. On a Change of Control Event, all unvested Performance Rights will vest and become exercisable, with such vesting deemed to have taken place immediately prior to the effective date of the Change of Control Event, regardless of whether or not the employment, engagement or office of the holder is terminated or ceases in connection with the Change of Control Event. A Performance Right will automatically lapse upon the earlier of: (a)
the elapsing of any opportunities for the Performance Rights to vest;
(b) a determination by the Board, acting reasonably, that the holder has committed an act of fraud, defalcation or gross misconduct in relation to the Company; (c)
the holder ceasing to be an employee or director for any reason other than retirement, permanent disability or death; or
(d) the occurrence of any other event as set out in the Plan. If there are variations to the share capital of the Company including a sub-division, consolidation, reduction, return or cancellation of share capital, a demerger (in whatever form) or other distribution in specie, the Board shall adjust the number of Performance Rights in accordance with the ASX Listing Rules and in a manner consistent with the Corporations Act, so as to preserve the proportionate value of the Performance Rights vis-à-vis the Shares. The Company will issue Shares as soon as practicable after the vesting and exercise of any Performance Rights. The Shares allotted will be of the same class and will rank equally with all other issued Shares in the Company at the date of issue but may remain subject to disposal restrictions in accordance with the Company’s trading policy and the terms of the offer. The Company will apply for quotation of the new Shares on ASX within the period required by the ASX Listing Rules. Alternatively, the Board may elect to acquire shares on-market to deliver to the holder upon the vesting of any Performance Rights.
- 25 -
Proxy Voting Form If you are attending the Meeting in person, please bring this with you for Securityholder registration. Catalyst Metals Limited | ABN 54 118 912 495
Your proxy voting instruction must be received by 10:00am (AWST) on Tuesday, 10 November 2026, being not later than 48 hours before the commencement of the Meeting. Any Proxy Voting instructions received after that time will not be valid for the scheduled Meeting.
SUBMIT YOUR PROXY Complete the form overleaf in accordance with the instructions set out below. YOUR NAME AND ADDRESS The name and address shown above is as it appears on the Company’s share register. If this information is incorrect, and you have an Issuer Sponsored holding, you can update your address through the investor portal: https://investor.automic.com.au/#/home Shareholders sponsored by a broker should advise their broker of any changes. STEP 1 - APPOINT A PROXY If you wish to appoint someone other than the Chair of the Meeting as your proxy, please write the name of that Individual or body corporate. A proxy need not be a Shareholder of the Company. Otherwise if you leave this box blank, the Chair of the Meeting will be appointed as your proxy by default.
Lodging your Proxy Voting Form: Online Use your computer or smartphone to appoint a proxy at https://portal.automic.com.au/investor/home or
scan the QR code below using your smartphone Login & Click on ‘Meetings’. Use the Holder Number as shown at the top of this Proxy Voting Form.
DEFAULT TO THE CHAIR OF THE MEETING Any directed proxies that are not voted on a poll at the Meeting will default to the Chair of the Meeting, who is required to vote these proxies as directed. Any undirected proxies that default to the Chair of the Meeting will be voted according to the instructions set out in this Proxy Voting Form, including where the Resolutions are connected directly or indirectly with the remuneration of Key Management Personnel. STEP 2 - VOTES ON ITEMS OF BUSINESS You may direct your proxy how to vote by marking one of the boxes opposite each item of business. All your shares will be voted in accordance with such a direction unless you indicate only a portion of voting rights are to be voted on any item by inserting the percentage or number of shares you wish to vote in the appropriate box or boxes. If you do not mark any of the boxes on the items of business, your proxy may vote as he or she chooses. If you mark more than one box on an item your vote on that item will be invalid.
BY MAIL: Automic GPO Box 5193 Sydney NSW 2001
APPOINTMENT OF SECOND PROXY You may appoint up to two proxies. If you appoint two proxies, you should complete two separate Proxy Voting Forms and specify the percentage or number each proxy may exercise. If you do not specify a percentage or number, each proxy may exercise half the votes. You must return both Proxy Voting Forms together. If you require an additional Proxy Voting Form, contact Automic Registry Services.
IN PERSON: Automic Level 5, 126 Phillip Street Sydney NSW 2000
SIGNING INSTRUCTIONS Individual: Where the holding is in one name, the Shareholder must sign. Joint holding: Where the holding is in more than one name, all Shareholders should sign. Power of attorney: If you have not already lodged the power of attorney with the registry, please attach a certified photocopy of the power of attorney to this Proxy Voting Form when you return it. Companies: To be signed in accordance with your Constitution. Please sign in the appropriate box which indicates the office held by you. Email Address: Please provide your email address in the space provided. By providing your email address, you elect to receive all communications despatched by the Company electronically (where legally permissible) such as a Notice of Meeting, Proxy Voting Form and Annual Report via email.
BY EMAIL: [email protected]
BY FACSIMILE: +61 2 8583 3040 All enquiries to Automic: WEBSITE: https://automicgroup.com.au
PHONE: CORPORATE REPRESENTATIVES 1300 288 664 (Within Australia) If a representative of the corporation is to attend the Meeting the appropriate ‘Appointment of Corporate +61 2 9698 5414 (Overseas) Representative’ should be produced prior to admission. A form may be obtained from the Company’s share registry online at https://automicgroup.com.au.
STEP 1 - How to vote APPOINT A PROXY: I/We being a Shareholder entitled to attend and vote at the Annual General Meeting of Catalyst Metals Limited, to be held at 10:00am (AWST) on Thursday, 12 November 2026 at Celtic Club, 48 Ord Street, West Perth, Western Australia hereby: Appoint the Chair of the Meeting (Chair) to vote in accordance with the following directions (or if no directions have been given, and subject to the relevant laws, as the Chair sees fit) at this meeting and at any adjournment thereof.
Please note: If you are not appointing the Chair of the Meeting as your proxy, please write in the box provided below the name of the person or body corporate you are appointing as your proxy. If the person so named is absent from the meeting, or if no person is named, the Chair will act on your behalf.
The Chair intends to vote undirected proxies in favour of all Resolutions in which the Chair is entitled to vote. Unless indicated otherwise by marking the “for”, “against” or “abstain” box you will be authorising the Chair to vote in accordance with the Chair’s voting intention. AUTHORITY FOR CHAIR TO VOTE UNDIRECTED PROXIES ON REMUNERATION RELATED RESOLUTIONS Where I/we have appointed the Chair as my/our proxy (or where the Chair becomes my/our proxy by default), I/we expressly authorise the Chair to exercise my/our proxy on Resolutions 1, 6 and 7 (except where I/we have indicated a different voting intention below) even though Resolutions 1, 6 and 7 are connected directly or indirectly with the remuneration of a member of the Key Management Personnel, which includes the Chair.
STEP 2 - Your voting direction Resolutions
For
Adoption of the Remuneration Report
2
Re-election of Bruce Kay as a Director
3
Election of Mark Connelly as a Director
4
Ratification of Prior Issue of the Albright Consideration Shares
5
Ratification of Prior Issue of the Star Consideration Shares
6
Approval to Issue Securities to Unrelated Parties under the Company’s Employee Securities Incentive Plan
7
Approval to issue LTI Performance Rights to James Champion de Crespigny (or his nominee) for the current financial year (FY27 LTI Performance Rights)
8
Renewal of Proportional Takeover Provisions in the Constitution
Against
Abstain
CYL
1
Please note: If you mark the abstain box for a particular Resolution, you are directing your proxy not to vote on that Resolution and your votes will not be counted in computing the required majority on a poll.
STEP 3 – Signatures and contact details Individual or Securityholder 1
Sole Director and Sole Company Secretary
All Registry communications to: Automic Group GPO Box 5193 Sydney NSW 2001 Telephone (free call within Australia): 1300 288 664 ASX Code: CYL
13 October 2026 Upcoming Annual General Meeting of Shareholders
Dear Shareholder, Catalyst Metals Limited ACN (118 912 495) (ASX: CYL or “the Company”), advises the 2026 Annual General Meeting will be held in person at the Celtic Club, 48 Ord Street, West Perth, Western Australia on Thursday, 12 November 2026 at 10.00am (AWST) (Meeting). Notice of Meeting The Notice of Meeting and Explanatory Memorandum (Notice) for the Meeting is available online and can be viewed and downloaded by shareholders of the Company (Shareholders) from the Company’s website at www.catalystmetals.com.au or the Company's ASX market announcements platform at www.asx.com.au (ASX: CYL). In accordance with sections 110C-110K of the Corporations Act 2001 (Cth) (as inserted by the Treasury Laws Amendment (2021 Measures No.1) Act 2021 (Cth), Shareholders will not be sent a hard copy of the Notice or Proxy Form unless Shareholders have already notified the Company that they wish to receive documents such as the Notice and Proxy Form in hard copy. Voting by Proxy
Online scan the QR code below using your smartphone
Lodge your Proxy vote online at https://singleholding.automic.com.au/login by following the below instructions: 1.
Login to the Automic website using the holding details as shown on your holding statement.
Click on ‘Meetings’ - ‘Vote’.
To use the online lodgment facility, Shareholders will need their holder number (Securityholder Reference Number (SRN) or Holder Identification Number (HIN)) as shown at the top of your holding statement.
Appendix 2A - Application for quotation of securities
Announcement Summary
Entity name CATALYST METALS LIMITED Announcement Type New announcement Date of this announcement Tuesday October 13, 2026 The +securities to be quoted are: +Securities issued as part of a transaction or transactions previously announced to the market in an Appendix 3B Total number of +securities to be quoted ASX +security code
Security description
CYL
ORDINARY FULLY PAID
Number of +securities to be quoted
Issue date
313,448
13/10/2026
Refer to next page for full details of the announcement
Appendix 2A - Application for quotation of securities
1/6
Appendix 2A - Application for quotation of securities
Part 1 - Entity and announcement details
1.1 Name of entity CATALYST METALS LIMITED We (the entity named above) apply for +quotation of the following +securities and agree to the matters set out in Appendix 2A of the ASX Listing Rules. 1.2 Registered number type
Registration number
ACN
118912495
1.3 ASX issuer code CYL 1.4 The announcement is New announcement 1.5 Date of this announcement 13/10/2026
Appendix 2A - Application for quotation of securities
2/6
Appendix 2A - Application for quotation of securities
Part 2 - Type of Issue
2.1 The +securities to be quoted are: +Securities issued as part of a transaction or transactions previously announced to the market in an Appendix 3B Previous Appendix 3B details: Announcement Date and Time
Announcement Title
Selected Appendix 3B to submit quotation request
13-Aug-2026 09:49
New - Proposed issue of securities CYL
A placement or other type of issue
2.3a.2 Are there any further issues of +securities yet to take place to complete the transaction(s) referred to in the Appendix 3B? No
Appendix 2A - Application for quotation of securities
3/6
Appendix 2A - Application for quotation of securities
Part 3A - number and type of +securities to be quoted where issue has previously been notified to ASX in an Appendix 3B
Placement Details
ASX +security code and description CYL : ORDINARY FULLY PAID Issue date 13/10/2026
Distribution Schedule Provide a distribution schedule for the new +securities according to the categories set out in the left hand column including the number of recipients and the total percentage of the new +securities held by the recipients in each category.
Number of +securities held
Number of holders
Total percentage of +securities held For example, to enter a value of 50% please input as 50.00
1 - 1,000
%
1,001 - 5,000
%
5,001 - 10,000
%
10,001 - 100,000
%
100,001 and over
%
Appendix 2A - Application for quotation of securities
4/6
Appendix 2A - Application for quotation of securities Issue details
Number of +securities to be quoted 313,448 Are the +securities being issued for a cash consideration? No Please describe the consideration being provided for the +securities The Shares are being issued in consideration for the acquisition of mining tenements pursuant to an Asset Purchase Agreement Please provide an estimate (in AUD) of the value of the consideration being provided per +security for the +securities to be quoted 6.380000 Any other information the entity wishes to provide about the +securities to be quoted
Appendix 2A - Application for quotation of securities
5/6
Appendix 2A - Application for quotation of securities
Part 4 - Issued capital following quotation
Following the quotation of the +securities the subject of this application, the issued capital of the entity will comprise: The figures in parts 4.1 and 4.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing. 4.1 Quoted +securities (total number of each +class of +securities quoted on ASX following the +quotation of the +securities subject of this application) ASX +security code and description
Total number of +securities on issue
CYL : ORDINARY FULLY PAID
263,982,465
4.2 Unquoted +securities (total number of each +class of +securities issued but not quoted on ASX) ASX +security code and description
Total number of +securities on issue
CYLAW : OPTION EXPIRING 26-MAY-2027 EX $2.65
89,275
CYLAX : OPTION EXPIRING 18-AUG-2027 EX $1.79
11,920
CYLAQ : PERFORMANCE RIGHTS
Appendix 2A - Application for quotation of securities
9,542,688
6/6
13 October 2026 ASX Market Announcements ASX Limited Level 40 Central Park 152-158 St Georges Terrace PERTH WA 6000 CLEANSING NOTICE - SECTION 708 NOTICE This notice is given by Catalyst Metals Limited (Catalyst or the Company) under section 708A(5)(e) of the Corporations Act 2001 (Cth) (Act), as modified by ASIC Instrument 25-0622 (the Instrument). The Instrument provides that the Act applies to Catalyst as if subparagraphs 708AA(7)(c)(i) and 708A(6)(d)(i) of the Act were modified or varied by inserting after the words "Chapter 2M" the words "(other than section 295(3A) and 295(2)(ca) in relation to the financial year ended 30 June 2024)." References in this notice to the Act are references to the Act, as modified by the Instrument. The Company has released an Appendix 2A notice today for the issue of 313,448 fully paid ordinary shares (Shares). Please refer to Appendix 2A for further information. Notice under section 708A(5)(e) of the Corporations Act The Company gives notice under section 708A(5)(e) of the Act in relation to the issue of 313,448 Shares in the Company without a disclosure document to exempt investors under Section 708 of the Act. The Company advises that: 1. 2. 3.
the Shares were issued without disclosure to investors under Part 6D.2 of the Act; this notice is being given under section 708A(5)(e) of the Act; as at the date of this notice, the Company has complied with: (a) the provisions of Chapter 2M of the Act as they apply to the Company; and (b) sections 674 and 674A of the Act; and as at the date of this notice, there is no information that is “excluded information” within the meaning of sections 708A(7) and 708A(8) of the Act that has not already been disclosed to investors generally or as required under section 708A(6)(e) of the Act.
Authorised for release by the Board of Directors of Catalyst Metals Limited.
Level 9, 150 St Georges Terrace, Perth WA 6000 PO Box 7161, Cloisters Square PO WA 6850 Telephone: (61-8) 6324 0090 Email: [email protected] www.catalystmetals.com.au ABN 54 118 912 495
ASX Announcement 29 September 2026
Catalyst Metals’ flagship asset is the 40km long Plutonic Gold Belt in Western Australia. This belt currently produces ~100koz pa at an AISC of ±A$2,800/oz from three mines at Plutonic Main, Plutonic East and Keillor.
2Moz Reserve lays foundation for ±200koz for ±10 years at Plutonic
Catalyst is currently bringing three new mines into production - Trident UG, Cinnamon & Old Highway. Each will be processed through the existing, underutilised and centrally located 2Mtpa CIL processing plant.
•
When Catalyst consolidated the Plutonic Gold Belt three years ago, it saw the potential to create a long term, consistent and stable gold producer out of Plutonic – what it believes is a unique asset in today’s gold industry
•
The drivers to be a ±200koz annual gold producer are twofold: (1) Catalyst felt the Plutonic Belt’s mineral endowment could support such a Reserve and production profile; and (2) production of this scale is sufficiently attractive in today’s gold industry
•
To be such an asset, Plutonic needed considerable investment – an operational turnaround, fixing historical infrastructure, developing satellite mines and exploration
•
The announcement of this 2Moz Reserve is a considerable milestone for both Plutonic and Catalyst, providing the long-term confidence that comes with a 10 year mine life
•
It is also another important step in the journey to achieving the value that comes with Catalyst’s view that long life assets are rare
•
Over the last three years – albeit with only two focussed on Reserve growth – Catalyst has grown Reserves by 1.8Moz for ~A$226m at a cost of A$125/oz
•
Importantly, over half of the Reserve growth under Catalyst’s ownership is attributable to higher-grade ore sources - Trident, Old Highway, Cinnamon and Keillor
•
Catalyst will make a decision in December 2026 as to whether it changes its exploration activities and expenditure. In the meantime, it sees value in further potential low-cost Reserves coming from Trident, Cinnamon and Old Highway
•
In September 2025, Catalyst released general 10-year guidance. Since then, Catalyst has seen changes to permitting timelines, operational delays and processing capability. It has also seen increases in Reserves at key deposits in its development plan
•
As a consequence, September 2025 should be seen as a general guide as to management’s long-term vision for Plutonic
•
However, with this release, Catalyst has de-risked a key area of the ±200koz plan – delivering the sources of Ore Reserves for the next ±10 years and displacing previously included lower-confidence Resource and exploration material in the later years
•
Catalyst now has the deposits, infrastructure and Reserves – all the elements to achieve its long-term plan. This is underpinned by a balance sheet built over the past 18 months which allow execution of the plan without being impacted by external pressures
Exploration is targeting down dip extensions of each of these deposits. With the development and exploration of these six deposits, Catalyst aims to increase production from ±100koz to ±200koz annually. In so doing, Catalyst is aiming for Plutonic to have a 10 year mine life - a unique and rare proposition for an underground Western Australian gold mine. Catalyst also controls a processing plant and +75km of strike length immediately north of the historic +22Moz Bendigo goldfield. Here, Catalyst has delineated a high-grade, greenfield resource at 26 g/t Au. Further discoveries along strike are expected. Capital Structure Shares o/s: 261m Options: 0.1m Rights: 11.9m Cash & Bullion: A$331m Debt: Nil Reserve and Resource1,2
Base load ore sources at Plutonic, Trident and Cinnamon support long-term, stable ±200koz pa
MRE: 5.1Moz at 3.2g/t Au ORE: 2.0Moz at 2.6g/t Au Corporate Details ASX: CYL E:investors@catalystmetals. com.au W:catalystmetals.com.au
Catalyst Metals Limited (Catalyst or the Company) (ASX:CYL) is pleased to announce the delineation of 2Moz of Ore Reserves across the Plutonic Gold Belt in Western Australia. The 2Moz Reserve is an important milestone in Catalyst’s organic growth strategy as it represents the inventory to support a ±200koz per annum production rate for ±10 years.
Note 1: MRE includes Indicated Resources of 32.9Mt at 3.3g/t for 3.4Moz and Inferred Resources of 9Mt at 2.7g/t for 0.8Moz. ORE includes
ASX:CYL
Note 1: MRE includes Indicated Resources of 29Mt at 2.9g/t for 2.7Moz and Inferred Resources of 9Mt at 2.7g/t for 0.8Moz. ORE includes probable Reserves of probable Reserves of 18.1Mt for 1.5Moz.11Note 2: Refer to ASX Update announcement October “Annual Report to shareholders “. 10.6Mt at 3.0g/t for 1.0Moz. Referat to 2.6g/t ASX announcement October 2024 “Annual of Mineral 14 Resource and2025 Ore Reserve Statement” Note2:3:Refer Refer to ASX announcement 102025 September 2025 “Plutonic Beltdoubles” Reserves double, supporting growth plans Note to ASX announcement 4 August “Trident’s indicated Resource Note 3: as at 30 June 2025
1
Catalyst’s Managing Director and CEO, James Champion de Crespigny, said: “When Catalyst consolidated the Plutonic Gold Belt, we saw the opportunity to build Plutonic into a foundational pillar of a broader gold business. This pillar would see Plutonic set up as long-term, ±200koz production hub. Delineating 2Moz of Reserves – the inventory and ore sources for ±10 years of production is an important milestone in de-risking this plan. Importantly, as we have added deposits to the plan, the quality of the Reserves has improved. Around half the growth has come from higher-grade ore sources at Trident, Old Highway, Cinnamon and Keillor.”
Figure 1: Plutonic Gold Belt Reserve Growth Over the past 12 months Catalyst has grown Ore Reserves by 35% from 1.5Moz to 2.0Moz, with updated Ore Reserves statements outlined for Plutonic East, Keillor and Old Highway and recently released increases in Ore Reserve at Trident and Cinnamon. A summary of Catalyst’s Reserves is set out in Table 1 below. Since acquisition, Catalyst has grown the Plutonic Belt’s Reserve base four-fold and added ~1.8Moz of Reserves after depletion. Much of this growth has come from higher-grade ore sources including Trident, Old Highway, Cinnamon and Keillor. Today, half of the Plutonic Belt’s Reserves are attributable to these higher-grade sources.
ASX:CYL
catalystmetals.com.au
2
Figure 2: Plutonic Belt Reserve growth under Catalyst ownership Table 1: Summary of Plutonic Belt Probable Reserves at 30 June 2026 Deposit
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Plutonic Main1
10.3
2.3
758
Plutonic East
0.5
2.1
34
Trident2
3.9
4.2
524
Keillor
0.8
3.8
101
Old Highway3
0.7
4.8
101
Cinnamon4
2.4
3.0
232
Total Underground
18.5
3.0
1,751
Keillor
0.2
1.2
9
Old Highway
1.2
1.4
54
Cinnamon3
2.0
1.4
88
Underground
Open Pits
Hermes2
1.2
1.6
62
Total Open Pit
4.6
1.4
213
Surface stockpiles
0.2
1.0
7
Plutonic Belt Total
23.4
2.6
1,971
1
Refer ASX announcement 14 October 2025 “Annual Report to shareholders”. Reserves shown includes depletion for FY26.
2
Refer ASX announcement 14 September 2026 ”Trident Reserves grow by 30%”
3
Refer ASX announcement 10 September 2026 ”Plutonic Belt Reserves double to 1.5Moz”
4
Refer ASX announcement 21 September 2026 “Cinnamon resource grows 370%, maiden underground Reserve”
ASX:CYL
catalystmetals.com.au
3
Path to ±200koz production The delineation of 2Moz of Reserves has been an important target for Catalyst’s plan to maintain an increased production rate at Plutonic of ±200koz per annum for ±10 years. The 2Moz Reserve underpins this long-term production rate. Having a now 10-year Reserve creates optionality for the business. If Catalyst decided to, it’s annual exploration requirements shift from ±600koz per year of Reserve growth to ±200koz per year of Reserve replacement. This places less pressure on the business. A 2Moz Reserve has been the target for the business and while it has been achieved, Catalyst will continue to invest in exploration and Reserve growth. Infill drilling of inferred Resources at key deposits including Trident and Cinnamon represent potential for near term Reserve conversion. Exploration continues at Old Highway, Keillor and Cinnamon to grow the Resources at depth, as does regional exploration of some 40 historical open pits. Growth beyond 2Moz Reserve Catalyst considers there is potential for ongoing Reserve growth across the Plutonic Belt through 1) infill drilling of the current 1Moz inferred Resources, and 2) additional Resources through extensional drilling. The broader exploration pipeline has numerous earlier stage exploration targets, however the more immediate opportunity for Reserve growth comes from the deposits forming part of Catalyst’s ±200koz production target. These are discussed below. Trident Drilling during FY2026 sought to test extensions of the exiting Trident deposit. As a result, Resource growth over this period came largely from new inferred Resources. Trident’s inferred Resources currently sit at 448koz at 4.6g/t Au. Future drilling programs will target infilling of these inferred Resources. To date, increased drilling density at Trident has resulted in improved grade. This was noted with both Resource conversion and grade control drilling. In addition, Trident’s inferred Resources have had a 75% conversion into indicated. In time, Trident’s inferred Resources are expected to convert to indicated and subsequently Reserves.
Figure 3: Trident long section showing indicated and inferred Resources
ASX:CYL
catalystmetals.com.au
4
Cinnamon The Cinnamon underground deposit was discovered in late 2025 and Catalyst moved quickly to define and infill drill it for the purposes of an updated Resource and Reserve. Cinnamon is hosted in one of several repeating conglomerate units. Resource definition drilling was largely focussed on a single conglomerate – the host of the identified high-grade shoot. Inferred Resources in this shoot are currently 105koz at 3.3g/t Au and represent the immediate opportunity for infill drilling and Reserve growth. Drilling during the year sought to target repeat mineralised conglomerate units identified in the focused drill out of the high-grade zone. Encouragingly initial results received from these target areas has confirmed mineralisation above, adjacent to and beneath the existing high-grade zone. Of note, is one of these targets, hosted by the same conglomerate as the open pit mineralisation and located adjacent and parallel to the current high-grade zone has returned results such as 19m at 5.7g/t. These widths and grades are consistent with those found in the released underground Resource. Further drilling is now planned to both delineate and infill these target areas.
Figure 4: Cinnamon cross-section showing recent intercepts within repeat target conglomerates Old Highway Old Highway’s Resource is currently 313koz at 2.4g/t Au and includes a higher-grade underground Resource of 186koz at 4.1g/t Au. This is a 33% increase on prior Resources. Drilling during 2026 focussed on growing the underground mine life beyond its initial four years and testing for down-dip extensions of the ore body.
ASX:CYL
catalystmetals.com.au
5
Extensional drilling returned a number of encouraging results at depth including 26m at 5.9g/t, 300m down dip of the existing Resource and 8m at 10.5g/t along strike5. These results demonstrate the potential for the Old Highway Resource and mine life to grow further.
Figure 5: Old Highway long section showing MRE and intercepts at depth and along strike indicating potential for further Resource growth FY2026 exploration program Catalyst’s Reserve growth has been achieved following an exploration program of ~A$80m during FY2026. Drilling targeted (1) growing Reserves and extending mine lives by targeting down-dip extensions of known deposits, and (2) testing previously underexplored areas of the Plutonic Belt. The growth in Reserves was underpinned by a number of important achievements during the year, including: • •
•
5
Trident – Resource growth of 36% to 1.1Moz at 5.4g/t Au6. Much of this growth came from extensional drilling and inferred Resources. In time, these will be infill drilled and represent potential Reserve growth; and Cinnamon – the discovery and delineation of a maiden high-grade underground Reserve of 232koz at 3.0g/t Au7 within 12 months of discovery. A number of intercepts outside of the main zone indicate the potential for repeat targets which are being tested; and Keillor – Resource growth of 280% to 307koz at 3.0g/t Au8, following the first meaningful drilling at the deposit in 25 years.
Refer ASX announcement 15 May 2026 “Drilling at Old Highway confirms resource growth potential”
6 Refer ASX announcement 14 September 2026 ”Trident Reserves grow by 30%” 7 Refer ASX announcement 21 September 2026 “Cinnamon resource grows 370%, maiden underground Reserve” 8
Refer ASX announcement 9 September 2026 “Keillor Resource grows by 280%”
ASX:CYL
catalystmetals.com.au
6
FY2026 Resource Growth Resources across the Plutonic Gold Belt have increased from 4.1Moz to 5Moz over the past 12 months. Updated Mineral Resource Statements are outlined for Old Highway and Plutonic East. Growth in Resources at Trident, Keillor and Cinnamon during the year have been detailed in recent ASX announcements 5, 6, 7. Table 2: Summary of Plutonic Belt Resources Indicated
Inferred
Total
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Underground
28.1
3.9
3.5
6.5
3.6
Open Pits
9.8
1.5
0.5
4.2
Plutonic Belt Total
37.9
3.3
4.0
10.7
Deposit
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
0.8
34.6
3.8
4.3
1.6
0.2
14.2
1.6
0.7
2.8
1.0
48.8
3.2
5.0
Plutonic Belt Ore Reserves and Mineral Resources Ore Reserves9 Proved
Probable
Total
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Plutonic Belt Underground
18.5
3.0
1,750
18.5
3.0
1,750
Plutonic Belt Open Pit
4.6
1.4
213
4.6
1.4
213
Stockpiles
0.2
1.0
7
0.2
1.0
7
Total Reserves
23.4
2.6
1,970
23.4
2.6
1,970
Ore Reserve
Numbers may not add up due to rounding Ore Reserves are based on a gold price of A$4,500/ounce
Reported Ore Reserves account for mining depletion within the reporting period at Plutonic Main, Plutonic East, and Keillor
Mineral Resources Mineral Resource
Measured Tonnes Grade (Mt) (g/t Au)
Indicated Gold (koz)
Inferred
Tonnes Grade (Mt) (g/t Au)
Gold (koz)
Tonnes Grade (Mt) (g/t Au)
Total Gold (koz)
Tonnes Grade (Mt) (g/t Au)
Gold (koz)
Plutonic Belt Underground
28.1
3.9
3,484
6.5
3.6
765
34.6
3.8
4,271
Plutonic Belt Open Pit
9.8
1.5
487
4.2
1.6
209
13.9
1.6
694
Surface stockpiles
0.2
1.0
7
0.2
1.0
7
Plutonic Belt Resources
37.9
3.3
3,972
10.9
2.8
981
48.7
3.2
4,972
0.5
4.5
73
0.2
14.0
90
0.7
7.2
163
Bendigo Gold Project
Total Bendigo Resources
0.5
4.5
73
0.2
14.0
90
0.7
7.2
163
Group Resources
38.4
3.3
4,045
11.1
3.0
1,071
49.4
3.2
5,142
9 CYL announcement 15 June 2023 “Maiden Mineral Resource of 163,000oz at Four Eagles project”, CYL announcement 6 August 2024 “ Mineral Resource
Update for K2 and Plutonic East Underground Mines”, CYL announcement 3 July 2024 “Trident Maiden Reserve Underpins Low-Cost Development”, CYL announcement 11 September 2024 “1Moz Reserve allows Catalyst to double production for A$31m, CYL announcement 22 February 2023 “Marymia Gold Project Mineral Resource - Updated”, CYL announcement 31 January 2025 “K1 and K3 Mineral Resource Update”, CYL announcement 8 May 2025 “Catalyst acquires Old Highway Gold Project”, CYL announcement 4 August 2025 “Trident Mineral Resource Update”
ASX:CYL
catalystmetals.com.au
7
The Company will be releasing its full Mineral Resource and Ore Reserve Statement (required under Listing Rule 5.21) in its Annual Report to Shareholders which will provide further details of the Company’s Mineral Resources and Ore Reserves by deposit, and material changes from the prior year. Updated Ore Reserves An Ore Reserve Estimation is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted. No inferred Mineral Resources are included in the Ore Reserves.
Plutonic East Underground Ore Reserves Following is a summary of the Plutonic East Underground Ore Reserves, as at 01 July 2026. Table 2: Plutonic East Underground Ore Reserves Proved Deposit Plutonic East UG
Probable
Total
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
0.5
2.1
34
0.5
2.1
34
Notes: 1. 2. 3.
Numbers may not add up due to rounding Ore Reserves are based on a gold price of A$4,500/ounce Reported Ore Reserves account for mining depletion within the reporting period at Plutonic East
Keillor (formerly K2) Ore Reserves Following is a summary of the Keillor Ore Reserves, as at 01 July 2026. Table 3: Keillor Ore Reserves Proved
Probable
Total
Deposit
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Keillor OP
229
1.2
9
229
1.2
9
Keillor UG
820
3.8
101
820
3.8
101
Total Keillor
1,049
3.3
110
1,049
3.3
110
Notes: 1. 2. 3.
ASX:CYL
Numbers may not add up due to rounding Ore Reserves are based on a gold price of A$4,500/ounce Reported Ore Reserves account for mining depletion within the reporting period at Keillor
catalystmetals.com.au
8
Old Highway Ore Reserves Following is a summary of the Old Highway Ore Reserves, as at 01 July 2026. Table 4: Old Highway Ore Reserves Proved
Probable
Total
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Old Highway OP
1,221
1.4
54
1,221
1.4
54
Old Highway UG
660
4.8
101
660
4.8
101
Old Highway Total
1,881
2.6
155
1,881
2.6
155
Deposit
Notes: 1. 2.
Numbers may not add up due to rounding Ore Reserves are based on a gold price of A$4,500/ounce
Updated Mineral Resources The Mineral Resource estimates have been prepared during July 2026 and are reported according to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Code’) 2012 edition.
Old Highway Mineral Resources Following is a summary of the Old Highway Open Pit Mineral Resource, as at 1 July 2026. Table 7: Old Highway Mineral Resource Measured
Indicated
Inferred
Total
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Old Highway UG
1.1
4.4
159
0.3
2.7
26
1.4
4.1
186
Old Highway OP
2.3
1.5
111
0.4
1.2
15
2.7
1.5
127
Total
3.4
2.5
271
0.7
1.8
42
4.1
2.4
313
Deposit
Notes: 1. 2. 3.
ASX:CYL
Underground resource consists of Fresh material only Open Pit resource consists of Oxide and Transitional material only Numbers may not add up due to rounding.
catalystmetals.com.au
9
Plutonic East Mineral Resources Following is a summary of the Plutonic East Mineral Resource, as at 1 July 2026. Table 8: Plutonic East Underground Mineral Resources Measured Deposit Plutonic East UG
Notes: 1. 2.
ASX:CYL
Indicated
Inferred
Total
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
0.9
3.3
91
0.7
2.4
52
1.6
2.9
143
Underground Mineral Resource consists of Fresh material only Numbers may not add up due to rounding
catalystmetals.com.au
10
Material information summary as required under ASX Listing Rule 5.8 and JORC Code (2012) reporting guidelines. MINERAL RESOURCE ESTIMATE (Plutonic East Underground) Mineral Resource Statement The Mineral Resource Statement for the Plutonic East Underground Mineral Resource estimate was prepared during August 2026 and is reported according to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Code’) 2012 edition. The Mineral Resource Estimate incorporates all drilling data completed by Catalyst since the previous MRE (June 2024) to the current data cut-off date of 28 July 2026. Underground sampling data comprised 997 diamond holes (71,512 m), 18 sludge holes (137 m), and 4,500 m of face samples which form the basis of this Mineral Resource update. Additional surface drilling comprised of 2 Diamond Core and 88 Reverse Circulation holes for a total of 14,035 drill metres. The Plutonic East Underground Mineral Resource has a current vertical extent of 270 m, commencing from approximately 80 m below the current topographic surface at 1510 mRL and extending to 1160 mRL. Catalyst commenced underground re-development activities in April 2024 and produced first stoping ore in March 2025. In the opinion of Catalyst, the resource evaluation reported herein is a reasonable representation of the global gold Mineral Resources within the Plutonic East underground deposit, based on sampling data from face samples, RC, DD and sludge drilling available as of 28 July 2026. The Plutonic East Underground Mineral Resource (MRE) has been undertaken with a focus on delineating areas of the MRE with Reasonable Prospects for Eventual Economic Extraction (RPEEE) by underground mining methods. The underground component of the MRE has been reported at a 1.5 g/t Au cut-off within fresh material only to a maximum vertical depth of 350 m below the topographic surface. The entire MRE consists of Indicated and Inferred Mineral Resources is presented in Table 1 below. No Measured Mineral Resources have been reported at this stage of the project.
Classification
Tonnes (Mt)
Grade (g/t Au)
Indicated Inferred Total
0.9 0.7 1.5
3.3 2.4 2.9
Ounces (Koz) 91 52 143
Table 1 – Plutonic East MRE reported at a 1.5 g/t Au cut-off
Notes: 1. 2.
ASX:CYL
Underground resource consists of Fresh material only Numbers may not add up due to rounding
catalystmetals.com.au
11
Drilling Techniques Over their 35-year production history, the Plutonic and Plutonic East deposits have been sampled using numerous drilling and sampling techniques by Catalyst Metals Limited and previous operators. Drilling and sampling techniques by previous operators is assumed to be to industry standard at that time. Plutonic East uses the Plutonic local grid system (POL). The sampling database has been compiled from information collected when the Project was under ownership of numerous companies including (listed from most recent): • • • • • • • •
Catalyst Metals (2023 to current) Superior Gold (2016 to 2023) Northern Star Resources (2014 to 2016) Barrick Gold (2001 to 2014) Homestake (1999 to 2001) Resolute (1994 to 1999) Battle Mountain Australia Inc. (Pre 1994) Inco (1969-1971 and 1972-1976)
For Mineral Resource estimation, the Plutonic East area has been based on diamond drilling (DD) from surface and underground platforms, surface reverse circulation drillholes (RC), underground rock chip face samples (FS) and underground sludge drilling (SL). RC drilling has been conducted utilizing a 5.75” face sampling bit. Surface and underground Diamond drilling utilises NQ core with a diameter of 47.6 mm. Historical diamond core drilling consisted of BQ (36.4 mm), BTW (42 mm), LTK60 (43.9 mm), NQ (47.6 mm), NQ2 (50.7 mm). Sludge drilling is performed with an underground production drill rig. It is an open hole drilling method using water as the flushing medium, with a 45mm or 102mm hole diameter. Sludge holes are drilled at a sufficient angle (>25 deg) to ensure adequate hole flushing and chip drainage to minimise effects of sample smearing between metre intervals. Probe holes range from 4.6 m to 13.7 m in length, depending on whether a Jumbo or Long-hole configuration is used. Underground DD and sludge holes were drilled as ‘fans’ from suitable drill platforms and intersect the lodes at variable orientations. Collar locations are picked up regularly by site surveyors. Downhole surveys are completed using a Devi-Gyro survey instrument every 3 metres and detailed structural measurements and logging is carried out. Face chip samples are completed by the mine geologists. The sampling is taken by chipping the face into calico bags with definition by lithological boundaries. The channels are spatially positioned within underground development voids which are picked up regularly by site surveyors. Historical Drilling Extensive previous work has been completed by a number of companies, and the history is detailed below. The quality of the historical drilling information is varied, but all of the companies adopted high-quality methodology at the time. • • •
ASX:CYL
1969-1976 – International Nickel Company (Inco) conducted nickel exploration using geochemistry, geophysics, costeaning, RAB and RC drilling. 1987 – Great Central Mines (GCM) identified an arsenic and gold anomaly by geochemical sampling in the Plutonic tenements. 1987-1993 – Battle Mountain Australia (BMA) undertook regional mapping, Bulk Leach Extractable Gold (BLEG) soil sampling, and RAB drilling. The Triple P, Pelican, Albatross and Flamingo deposits
catalystmetals.com.au
12
•
• • •
•
•
•
•
•
•
were discovered in 1992. Further RAB, AC, RC and DD programs were conducted to define these deposits. 1988-1994 - Resolute Resources Ltd (75%) and Titan Resources NL (25%) commenced exploration on the Marymia tenements. Gold mineralisation was discovered in the Keillor Shear Zone following regional exploration soil, stream sediment and rock chip sampling and geological mapping. Several phases of follow-up RAB, AC, RC and DD drilling was carried out. K1 deposit was discovered in 1989. Prospect scale geophysical surveys including magnetics and gradient array IP were undertaken between 1989 and 1994. 1990 – GCM carried follow up grid-based mapping, soil and lag geochemical surveys which led to the discovery of the Plutonic deposit. 1990 – GCM discovered satellite deposits at Area4 and Channel. Both were mined by open pit between 1999 and 2001. 1990-1995 – Plutonic Resources exploration division carried out exploration on the Freshwater tenements and discovered a total of 1 underground and 30 surface prospects. Follow up resource definition drilling resulted in conversion of these prospects to 10 open pits and one underground mine, including Area 4 open pit, Plutonic East underground deposit, Salmon, Trout and Perch. 1999-2004 - Homestake Gold of Australia undertook a detailed aeromagnetic and radiometric survey over the entire lease area. Additional IP and moving loop geophysical surveys were undertaken between 2000 and 2004 across several prospects. The largest of which was across the K1-K2 project area in 2004. 2004 - the Plutonic Development department undertook a large soil sampling programme over the northwestern end of the Marymia tenements, in conjunction with the IP survey. These surveys identified a number of targets that were followed up with some additional surface geochemical sampling. 2001-2007 - exploration and resource definition drilling by RAB, RC and diamond core drilling was undertaken by the Plutonic Development department across numerous prospects outside of the Plutonic Mine area. Many of these drilled prospects were proven up to become small satellite open pit mines such as Triple P B-Zone, Albatross, Flamingo, Kookaburra, Ibis, Piranha, to name a few. 2009-2012 - RC and diamond core drilling concentrated on extensions to the known Plutonic deposit. Outside of this area two 2D seismic lines were shot in conjunction with Curtin University and diamond core drill was undertaken at Plutonic West and Cod prospects. Plutonic East underground production ceased in 2012. 2012-2016 – under Northern Star Resources (NSR) surface exploration drilling was undertaken at prospect Big Fish located on the Eastern side of Plutonic East. A handful of underground diamond drill programs occurred to chase up-dip and down-dip extensions of known mineralisation. 2016 – 2023 - Superior Gold took over from NSR and continued Big Fish surface drilling program. In 2019 a geotechnical drilling program was undertaken on the Area4 open pit western edge from surface.
Sampling and Sub-Sampling Techniques Catalyst has undertaken surface RC and DD drilling, underground grade control DD drilling, sludge drilling and face samples at the Plutonic East deposit since the re-development and mining activities were re-started in April 2024. Surface DD core was half-cut and sampled on 1m intervals or to geological contacts, with sample lengths varying between 0.3 m to 1 m. Whole core sampling was instigated for broken/sheared zones which could not be cut. This resolved any possible biasing issues with 1/2 core grab samples within incompetent fractured and sheared zones. RC samples were collected for each metre drilled and passed through a cyclone and cone splitter to produce a 2 kg to 4 kg sample for assay into calico bags. Depending on the oxidation state of the rock, the sample
ASX:CYL
catalystmetals.com.au
13
weight varied between three and five kilograms. The RC drilling and sampling were supervised at the drill site by a company sampler and geologist. The cone splitter has double chutes for field duplicates with infinite adjustment between 4 – 15% per sample chute. The cyclone was cleaned using compressed air after every sample and the cyclone was cleaned every 40m, or more regularly at the geologists' discretion. Underground grade control DD core is whole core sampled and sent for analysis. DD core samples were taken at 1 m intervals or at geological boundaries. Sample lengths ranged from 0.3m to 1.7m. Rock chip face samples are completed by the mine geologists. The face channel samples were nominally chipped across the face from left to right, sub-set via geological features as appropriate. The face samples are taken perpendicular to the lode orientation in the face where the sample locations are marked up and measured from fixed survey points. Sample lengths ranged from 0.2m to 1.5m. Sludge drilling used nominal sample lengths of 0.9m and 1m depending on whether a Jumbo or Longhole configuration is used. A 3-5kg sample is captured using the ‘sludge cone’ (aluminium cylindrical cone purchased from WESTERNEX). Catalyst diamond drilling practice results in high core recovery due to the competent nature of the ground, with an average recovery of 99% through the mineralised zones. The core is jig sawed back together, and metre marked carefully and core loss blocks inserted where required. Discrepancies to core blocks are brought up with the drill contractor. Historical Sampling The Plutonic Gold Mine has been in operation since 1990 following discovery in 1988. QAQC procedures have changed throughout that period. The current underground Mineral Resources have been identified over a long period of time with a number of companies. All high confidence Mineral Resources are based dominantly on underground DD and FS completed in the last 14 years. Drilling and sampling techniques by previous operators are assumed to be to industry standard at that time. Sample Analysis Method and QAQC The Plutonic East samples have been processed at various laboratories. All RC samples were dispatched to the ALS and ITK laboratories in Perth for gold fire assay analysis (Au-AA26 & Au-FA25 or Au-FA50). Surface DD core samples were sent to several labs: the majority to Plutonic onsite lab (PAL_DIBK), and the remainder to BV (Au-FA50-AAS) and ALS (Au-AA26). All underground grade control samples (DD, FS & SL) were dispatched to the Plutonic site laboratory for analysis using PAL method (PAL_DIBK). Sample preparation and analytical methods for each laboratory are detailed below: Plutonic onsite lab by PAL method (PAL_DIBK) includes: o 1-4 hours drying at 105°C depending on moisture content. o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o A nominal 500g riffle split sample is used for PAL assaying for 1 hour leach cycle. o PAL 1000 Grind Check: a minimum of 95% passing 75 μm sieve size. o Sample re-assay or duplicate samples are taken from the retained original crushed sample. ALS laboratory includes: o Sample sorting and drying (DRY-21). o Core sample is coarse crushed (CRU-21), RC samples not crushed.
ASX:CYL
catalystmetals.com.au
14
o o
Pulverise entire sample to a particle size of 85% passing 75µm (PUL-24). 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (Au-AA26).
BV laboratory includes: o Sample sorting and drying (PR001). o Entire core sample is crushed to 10mm (PR102), RC samples not crushed. o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 90% passing 75µm (PR303). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (FA50). ITK laboratory includes: o Sample sorting and drying at 105°C. o Entire sample is crushed to a nominal 90% passing 2mm (SPO3) o Riffle splitting to obtain between 1.5 to 3kg. o Pulverising to a particle size of 90% passing 75µm (SPO3). o 200g sample aliquot for lead collection by Fire Assay 25g and 50g charges with ICP-OES finish (FA25/OE02 and FA50/OE02). A summary of samples collected by Catalyst and used for the resource estimate are detailed below in Table 2.
Sample type RC samples
ALS
BV
ITK
PLUTONIC
Au-AA26
Au_FA50_AAS
Au_FA
Au_PAL_DIBK
4,325
4,724
Face samples (FS)
9,049 4,837
Sludge samples (SL) Diamond Core (DD)
2,617
4,631
Total
6,942
4,631
4,724
Total
4,837
140
140
79,251
86,499
84,228
100,525
Table 2 – Summary of Catalyst primary sample types
Quality Assurance and Quality Control (QAQC) samples are included in each sample batch and are dispatched to the assaying laboratory to measure the accuracy and precision of the returned assays. QAQC samples inserted into the sample stream include: •
• •
Certified Reference Material (CRM) were submitted at an average rate of 3% of the total number of samples. CRMs are of similar grade tenor to those grades that characterise the deposit and were selected based on their grade range and mineralogical properties with an emphasis on sulphide ores. Coarse 40mm blanks were inserted at an average rate of 3% of the total number of samples. RC field duplicates were inserted at an average rate of 3% of the total number of samples.
Crush sizing analysis is conducted randomly by the commercial laboratories as part of their QC process. Pulp residues are expected to have 90% passing ≤75μm. This data is monitored by the Laboratory Supervisor. Grind times can be lengthened accordingly. Catalyst samples have been stored on site and delivered to the external ALS, BV and ITK assay laboratories in Perth by a Contracted Transport Company. Consignment notes have been used to track the samples. Operator sample security is assumed to be consistent and adequate. Sample preparation protocols and sample sizes are considered appropriate for the style of mineralisation encountered and should provide representative results.
ASX:CYL
catalystmetals.com.au
15
The Plutonic Gold Mine has been in operation since 1990 following discovery in 1988. QAQC procedures have changed throughout that period. The current underground Mineral Resources have been identified over a long period of time with a number of companies. All high confidence Mineral Resources are based dominantly on underground DD and FS completed in the last 14 years. A comprehensive review of the QAQC results was undertaken for both the 2022 and 2023 MRE updates of the Plutonic Underground by Superior Gold and Cube Consulting respectively. Conclusions from the 2023 MRE Competent Person include: • • • • •
Results indicate that the QAQC performance is sufficient for using the data for an underground Mineral Resource Estimate; Element of risk in using PAL due to incomplete digestion; Site laboratory performance (the majority of the samples) is poorer than off-site commercial laboratories (ALS and Bureau Veritas) due to contamination and percentage of CRM failure; Site laboratory shows poorer performance at low levels of Au (0.4 - 0.8 g/t), but effect on underground Mineral Resources likely to be minimal; Precision of CRMs for site laboratory poorer than manufacturer.
No independent review of the QAQC results at Plutonic East were undertaken for this MRE update. Regional and Local Geology The Plutonic East gold deposit is located within the Archaean Plutonic Well Greenstone Belt, an elongate NE trending belt within the Marymia Inlier. The Marymia Inlier is an Archaean basement remnant within the Proterozoic Capricorn Orogen and comprises two mineralised greenstone belts (Plutonic Well and Baumgarten greenstone belts), with surrounding granite and gneissic complexes. The Capricorn Orogen is situated between the Pilbara and Yilgarn cratons and is interpreted to be the result of the oblique collision of these two Archaean cratons in the early Proterozoic.
ASX:CYL
catalystmetals.com.au
16
Figure 1: Location of Plutonic East Deposit
ASX:CYL
catalystmetals.com.au
17
Gold mineralisation occurs in a large number of deposits and prospects in the Belt, with the main deposit at the Plutonic Gold Mine. Mineralisation regularly occurs as shallowly dipping, layer parallel lodes, although steep lodes and minor quartz-vein-hosted deposits also occur. Regionally within the greenstone belt, mineralised host rocks vary from amphibolites to ultramafics and banded iron formation (BIF). Lateritic and supergene enrichment are common throughout the Belt and has been mined locally. Biotite, arsenopyrite, and lesser pyrite/pyrrhotite are common minerals generally accepted to be associated with gold mineralisation. Mineralisation at Plutonic East is characterised by a series of steep to flat-lying, stacked replacement-style lodes, individually up to five metres wide that are hosted within ductile shear zones oriented slightly oblique to stratigraphy. Lodes are preferentially restricted within the top half of the Mine Mafic, which is a sequence of upper-greenschist to lower amphibolite grade basaltic flows of variable thickness sandwiched between the hanging wall and footwall ultramafic units. Lodes are characterised by intense banding, defined by crude mineral segregation and mineral alignment. Gold where visible, is commonly associated with grey quartz veins and fine-grained arsenopyrite and pyrrhotite. The main style of gold mineralisation (Plutonic brown-lode) typically occurs as thin (~1 – 3 m wide) lodes that consist predominantly of quartz-biotite-amphibole-titanite-epidote-carbonate-tourmaline-arsenopyritepyrrhotite ± chalcopyrite ± scheelite ± gold. Visible gold is considered to have occurred at a late stage during the evolution of the deposit as it is largely undeformed and overprints most, if not all, of the minerals and fabrics. It is typically associated with thin, discontinuous quartz-calc-silicate veins within the brown-lodes. Where these gold-bearing zones are well developed, they tend to be near-parallel to the stratigraphy as marked by the rare metasedimentary horizons and to the dominant foliation, which is also typically parallel to metasediment horizons Geochemistry suggests that these lodes developed on the boundary between mafic units or are focused along or adjacent to minor metasedimentary units within the Mine Mafic unit. Lodes may be rich in arsenopyrite or pyrrhotite, and while arsenopyrite is a good indicator of mineralisation, it may not be present in all mineralisation. Geological Interpretation All drilling data completed by Catalyst since the previous MRE (data cut-off date of 6 June 2024) to the current data cut-off date of 28 July 2026 has been incorporated for the interpretation of the geological mineralisation domains for estimation (Figure 2). All available geological data was used in the interpretation, including drilling face sampling and mapping.
ASX:CYL
catalystmetals.com.au
18
Figure 2 Plutonic East Plan View - Drilling and Sample Types
Mineralisation domains were interpreted primarily on geological logging and downhole geological contacts, based on lithology, grade distribution, major faults and geometry. Weathering surfaces were created by interpreting the existing drill logging for oxidation state and were extended laterally beyond the limits of the Mineral Resource model. Four lithological units containing the bulk of Plutonic East mineralisation were constructed using Leapfrog software: • • • •
Overthrust Mafic – OTM Upper HangingWall (HW) Ultramafic – UM1 Mine Mafic – MMA Lower FootWall (FW)Ultramafic – UM2
These four lithological units form the basis of the primary estimation domains. Review of assay data, stope geometry and its relationship to the lithostratigraphic geometry was used to develop a conceptual model for Plutonic East in which Au mineralisation was related to two structural elements that developed during one progressive deformation event (D1). The conceptual model featuring the four lithological units and related structures are shown in plan and section views in Figure 3, Figure 4 and Figure 5. The earlier mineralised structures are flexural-slip shear zones developed in zones of competency contrast between mafic and sedimentary units within the Mine Mafic (‘MMA’) unit. These flexural slip zones developed in response to F1 folding producing an anticline-syncline pair that, subsequent to two later folding events, exhibit fold axes that plunge at gentle angles to the NW or SE. The folds are open in geometry and have axial planes that dip at steep angles to the NE, consistent with vergence to the SW. The flexural slip shear zones have dips that range from sub-horizontal to <25°, subparallel to primary layering. The later mineralised structures are restricted to the NE limb of the F1 anticline and have steeper dips that range from 25 - 45°.
ASX:CYL
catalystmetals.com.au
19
The most robust zones of Au mineralisation (both in terms of width and tenor) occur where the ramp structures intersect flexural slip structures. These intersection zones have been the focus of previous longhole stoping at Plutonic East. The confidence in the geological interpretation is high with all the information and over 30 years of open pit and underground operation used in the generation of the models.
Figure 3 Plutonic East Local Geology – Plan View
ASX:CYL
catalystmetals.com.au
20
Figure 4 Plutonic East Geological Framework - East West Cross-Section
Figure 5 Plutonic East Conceptual Mineralisation Model - East West Cross-Section
ASX:CYL
catalystmetals.com.au
21
Estimation Methodology Gold mineralisation at Plutonic East exhibits very similar style and spatial behaviour to that observed at the Plutonic mine located approximately 4km to the west. Indeed, the bulk of Plutonic East mineralisation is hosted in the same Mine Mafic (MMA) unit that hosts almost the entire Plutonic deposit. More than 95% of economic gold mineralisation at Plutonic East is hosted within the Mine Mafic Unit (MMA). Plutonic style mineralisation is characterised by a significant population of high to extreme gold grades that demonstrate very poor spatial continuity (only a few metres at best). These high-grade populations tend to occur in ‘clusters’ or cohesive zones on a large scale, however, the actual spatial continuity is very poor at a local scale, making it difficult to define robust zones of continuity without introducing significant bias. Raw Coefficients of Variation (CoV) are typically in the order of 8-27, indicating extreme statistical variability. The estimation approach adopted for Plutonic East was identical to that used for the November 2023 and August 2025 Plutonic Main MREs. The four primary domains were separately estimated for Plutonic East: • • • •
Mine Mafic Unit (MMA-1000) Upper Ultramafic Unit (UM1 – 2000) Lower Ultramafic Unit (UM2 – 3000) Overthrust Mafic Unit (OTM – 4000)
Given the similarities to the nearby Plutonic mine, most of the estimation parameters were applied as the average of parameters used for the November 2023 Plutonic MRE. The estimation method developed for the MRE combines Categorical Indicator Kriging (CIK) to define broad estimation domains, together with applying distance limiting at chosen grade thresholds to restrict the influence of the high grade and extreme grade values during grade interpolation. Prior to estimation, a closely spaced set of structural surfaces (form interpolants) are developed in Seequent Leapfrog Geo™ reflecting the primary controls on mineralisation within the primary lithological units. The form interpolant approach takes advantage of numerous structural measurements from orientated diamond holes and underground development faces to build the structural trend surfaces and uses these trend surfaces to determine the mineralisation trend in domaining and grade estimation. A dip and dip-direction of each triangle facets is imported into the Surpac block model to provide information for dynamic search and variogram model orientation during grade interpolation. Dynamic estimation is applied for estimating the CIK indicators and gold grades. All DD and FS data are composited to 1m downhole and data within dolerite dykes or vein zones are removed. Composited data was split into the eight mine areas. Two Categorical Indicator values are determined for each mine area: • •
A low-grade (LG) indicator to differentiate between background ‘waste’ and low-tenor mineralisation – 0.5 g/t Au. A high-grade (HG) indicator to define broad areas of higher-tenor mineralisation – 1.4 g/t Au.
Indicator variograms were modelled for the LG and HG thresholds for all mine areas. The indicator variograms for both grade thresholds exhibited a moderate nugget effect and demonstrated well-structured continuity up to 30m. The CIK indicators were estimated using Ordinary Kriging into a finely gridded block model with block dimensions of 1.25m x 1.25m x 1.25m. The small block size for the indicator process is beneficial for creating categorical sub-domains at resolution which can be used to accurately back-flag composite data. Three categorical sub-domains were generated for low-grade (LG), medium-grade (MG) and high-grade (HG) areas. The HG sub-domain was based on an indicator probability threshold of 0.35, and the LG sub-domain
ASX:CYL
catalystmetals.com.au
22
was based on an indicator probability threshold of 0.65. The MG sub-domain is assigned to blocks that do not satisfy either the HG or LG sub-domain criteria. The three categorical block model sub-domains (HG, MG and LG) were used to ‘back-flag’ the 1m composites from each mine area, thus creating a separate composite file for each sub-domain. Assay top-cuts have been applied to the sub-domain composite files. The top cuts are generally above the 99th percentile of the distribution and have been aimed at globally limiting extreme values only. In this estimation methodology, top-cuts are not used as the primary tool to control metal risk. The use of grade thresholds and distance limiting is considered a more objective and influential method in controlling metal risk, while better reflecting the actual localised occurrence of discontinuous high-grade gold mineralisation. The indicator cut-offs and assay top cuts for each domain are summarised below: Area Group
Domain Code
Mine Mafic Unit (MMA)
1000
Upper Ultramafic Unit (UM1)
Lower Ultramafic Unit (UM2) Overthrust Mafic Unit (OTM)
2000
3000
4000
Indicator
Indicator Cut-offs (Au g/t)
Assay Top Cut (Au g/t)
LG
0.5
2
MG
20
HG
1.4
300
LG
0.5
2
MG
10
HG
1.4
60
LG
0.5
2
MG
5
HG
1.4
20
LG
0.5
2
MG
10
HG
1.4
200
Table 3 – Plutonic East MRE reported at a 1.5 g/t Au cut-off
Given the similar spatial characteristics of mineralisation between Plutonic East and the Plutonic Mine, it was decided to use average grade variogram values modelled for the LG, MG and HG sub-domains for all mine areas from the Plutonic November 2023 MRE. The HG grade variograms exhibited a very high nugget effect (average 79%) with maximum ranges of only a few metres (average 3.4m). Grade variography undertaken on the HG domain confirms the extremely variable nature of Plutonic and Plutonic East mineralisation. Grade variography on the MG and LG domains resulted in lower nugget effects and longer ranges. Grade thresholds for distance limiting were also applied using averages from the Plutonic November 2023 MRE. Grade thresholds and distance limits from the Plutonic November 2023 MRE were optimised following a detailed backward-looking mill reconciliation using mine stope voids for the period January 2023 to August 2023 (550Kt).
ASX:CYL
catalystmetals.com.au
23
The final applied grade distance limits for Plutonic East are follows: • • •
0-8 g/t = No Limit 8-70 g/t = 10m
70 g/t = 5.5m
Prior to grade estimation, sub-domain codes from the 1.25m resolution block model are imported into a 2.5m x 2.5m x 2.5m resolution model and the proportion of LG, MG and HG is calculated for each 2.5m block. Grade estimation for the LG, MG and HG domains was undertaken in Surpac software using Ordinary Kriging with grade threshold distance limiting. Search routines and variogram orientations are drawn from the prepopulated dynamic search information recorded in each block. Final block grades at a 2.5m block resolution were calculated by weighting the estimated grades for each sub-domain by the relevant domain proportion. The parent estimation block size was 2.5m x 2.5m x 2.5m. A single-pass estimation strategy has been used across all domains, where a minimum of 3 and maximum of 12 composites have been utilised to estimate a block grade. It is possible that up to 36 composites can be used to estimate a parent block where there is a proportion of all three sib-domains present. Block discretisation was set at 3 E x 3 N x 3 RL points (per parent block). A standardised search ellipse of 25m x 25m x 6.25m was used. Octant restrictions were not used. Block sizes were selected based on drill spacing and expected mining selectivity. Typical data spacing varied from 3m x 3m to >40m x 40m. The model was validated by comparing statistics of the estimated blocks against the composited sample data; visual examination of the block grades versus assay data in section; swath plots; and reconciliation against previous production.
Figure 6 : Plutonic East Grade Model > 1.5 g/t Au – Isometric View looking west
ASX:CYL
catalystmetals.com.au
24
Bulk Density Bulk density is determined from drill core using a weight in air/weight in water method. Currently there is a database of over 3,800 bulk density measurements which have been taken from mineralised and unmineralised intervals, with an ongoing sampling program in place. Samples of between 0.5 and 2.0kg are weighed in air and weighed in water. The following equation is used to derive bulk density: Bulk Density = 𝑊𝑑 / (𝑊𝑑−𝑊𝑤). Bulk density was directly assigned by oxidation type and rock type: • • • •
Fresh MMA and Ultramafic = 2.9 t/m3 Transitional MMA and Ultramafic = 2.2 t/m3 Oxide MMA and Ultramafic = 1.8 t/m3 Pit Backfill and Surface Dumps = 1.8 t/m3
Classification Criteria The Mineral Resource has been classified following due consideration of all criteria contained in Section 1, Section 2 and Section 3 of JORC 2012 Table 1. The supplied drilling database represents an appropriate record of the drilling and sampling undertaken at the project. In general drilling, surveying, sampling, analytical methods and controls are considered appropriate for the style of mineralisation under consideration. The continuity and volume of the mineralised domains have been established by surface and underground diamond drilling, together with extensive underground development and production history. The estimation method and the associated search and interpolation parameters used are considered appropriate for estimation of the Mineral Resources and have been calibrated to recent production reconciliation. The Competent Person has considered all the relevant criteria and has classified the estimated Mineral Resources as Indicated and Inferred Mineral Resource. Factors considered when classifying the model include: •
•
•
Given the high degree of grade variability and spatial complexity at Plutonic East (extremely high nugget effect and minimal short-scale spatial continuity), it is difficult to generate local scale grade estimates that would adequately satisfy a Measured Resource classification. For this reason, no Measured material has been included in the September 2026 MRE. Due to the short-scale continuity of mineralisation, the portions of the MRE classified as Indicated are typically based on data spacing (DD and FS) less than or equal to 15 m x 15 m and located within close proximity to underground development. This drill spacing is appropriate for defining the continuity and volume of the mineralised domains and estimating robust global Mineral Resources. The portions of the MRE classified as Inferred typically represent peripheral areas of the deposit where geological continuity is present but not consistently confirmed by 15 m x 15 m drilling or closer.
Further considerations of resource classification include; • • • •
ASX:CYL
data type and quality, geological understanding, amount of historical development and stoping, and historical and recent production reconciliation performance.
catalystmetals.com.au
25
Mineralisation within the block model which did not satisfy the criteria for classification as Mineral Resources remained unclassified. The delineation of Indicated and Inferred Mineral Resources appropriately reflects the Competent Person’s view on continuity and risk at the deposit and is shown in Figure 7 and Figure 8.
Figure 7 : Plutonic East MRE classification – Isometric View looking west
Figure 8 : Plutonic East Indicated MRE Classification with Informing Drill Assays – Cross Section (N-S)
ASX:CYL
catalystmetals.com.au
26
Cut-off Grade The Plutonic East Underground Mineral Resources is reported at a cut-off grade of 1.5 g/t Au. The cut-off grade has been derived from current mining and processing costs and metallurgical parameters. Assessment of Reasonable Prospects for Eventual Economic Extraction The Plutonic East Underground Mineral Resource (MRE) has been undertaken with a focus on delineating areas of the MRE with Reasonable Prospects for Eventual Economic Extraction (RPEEE) by underground mining methods. The Underground MRE has been reported at a 1.5 g/t Au and constrained to fresh material only to a maximum vertical depth of 450 m below the topographic surface. Underground mining selectivity is assumed to include a minimum mining width of 1.5 m, minimum stope length of 5 m, and a minimum stope height of 5 m. The following criteria were considered in determining the RPEEE: • • • • • •
Deposit scale Geometry, in particular mineralisation true width and minimum mining width Proximity to ground surface Established ORE/existing mine plan for material above the Underground Resource Access to existing critical infrastructure Current gold price
The Mineral Resource is considered to have reasonable prospects for eventual economic extraction (RPEEE) given the access to critical infrastructure, the volume and grade of mineralisation available for mining and the RPEEE criteria which have been applied prior to reporting the Mineral Resource. The grade-tonnage curve for the Plutonic East classified resource for all domains is shown in Figure 9.
Figure 9 : Plutonic East MRE August 2026 vs MRE June 2024 Grade and Tonnage Curve – Indicated and Inferred
ASX:CYL
catalystmetals.com.au
27
Mining and Depletion Mining depletion to 1 July 2026 was applied to the model. Mining depletion is represented (at a 1.25m sub-cell size) through both a depletion inside all surveyed cavities and a reset to background of estimated grades within in a 2.5m skin around all historic stopes. Metallurgy Plutonic East is an operating mine and there are no material metallurgical issues that are known to exist. No metallurgical recovery factors were applied to the Mineral Resources or resource tabulations. MINERAL RESOURCE ESTIMATE (Old Highway) Material information summary as required under ASX Listing Rule 5.8 and JORC Code (2012) reporting guidelines. Mineral Resource Statement The Mineral Resource Statement for the Old Highway (OHW) Open Pit and Underground Mineral Resource estimate was prepared during August 2026 and is reported according to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Code’) 2012 edition. The Mineral Resource Estimate incorporates all drilling data completed by Catalyst since acquiring the deposit to the current data cut-off date of 5 August 2026. A total of 39,472.8m m of drilling from 125 reverse circulation (RC) drill holes and 69 diamond drillholes (DD) and diamond tails have been completed by Catalyst and form the basis of this Mineral Resource update. The previous MRE was based solely on historical drilling that was available as of 29 April 2025. The current vertical extent of the Old Highway Mineral Resource is approximately 550m from the current topographic surface. In the opinion of Catalyst, the resource evaluation reported herein is a reasonable representation of the global gold Mineral Resources within the OHW deposit, based on sampling data from RC, RCD and DD drilling available as of 05 August 2026. The Old Highway Mineral Resource (MRE) has been undertaken with a focus on delineating areas of the MRE with Reasonable Prospects for Eventual Economic Extraction (RPEEE) by both open pit and underground mining methods. The underground component of the MRE has been reported at a 1.5 g/t Au cut-off within fresh rock only to a maximum vertical depth of 550m below the topographic surface. The open pit portion has been reported at a 0.5 g/t Au cut-off for oxide and transitional material only. The total Old Highway MRE consists of both Indicated and Inferred Mineral Resources which are outlined in Table 1.
Indicated Deposit
Reporting Cutoff
Inferred
Total
Tonnes
Grade
Gold
Tonnes
Grade
Gold
Tonnes
Grade
Gold
(Mt)
(g/t Au)
(koz)
(Mt)
(g/t Au)
(koz)
(Mt)
(g/t Au)
(koz)
Underground
1.5
1.1
4.4
159
0.3
2.7
26
1.4
4.1
186
Open Pit
0.5
2.3
1.5
111
0.4
1.2
15
2.7
1.5
127
3.4
2.5
271
0.7
1.8
42
4.1
2.4
313
Total
Table 1 - Old Highway MRE (Open Pit = 0.5 g/t Au cut-off, Underground = 1.5 g/t Au cut-off)
ASX:CYL
catalystmetals.com.au
28
Notes: 1. 2. 3.
Underground resource consists of Fresh material only Open Pit resource consists of Oxide and Transitional material only Numbers may not add up due to rounding.
Drilling Techniques The Quest drill hole database, managed by EarthSQL, has been compiled from information collected when the Project was under ownership of: • •
Catalyst Metals (2025 to current) Sandfire Resources (2005 to 2025)
All Catalyst drilling data used in this Mineral Resource Estimate has been sourced from surface Diamond core drilling (DD) and Reverse Circulation (RC) drilling methods. A total of 39,472.8 m of drilling from 69 diamond and diamond tails (DD), and 125 reverse circulation (RC) holes have been completed by Catalyst since the previous MRE and form the basis of this Mineral Resource update (Table 2).
Table 2 – Summary of Catalyst Drilling Completed
All reported coordinates are referenced to grid system MGA_GDA94 Zone 50 and the topography is relatively flat within the drilling areas. RC drilling has been conducted utilizing a 5.75” face sampling bit. Surface Diamond core drilling utilises NQ core with a diameter of 47.6 mm. Catalyst drillholes have been routinely pegged using a Differential Global Positioning System (DGPS) handheld unit and marked with wooden pegs. Once completed, the collar position has been re-surveyed using the same DGPS unit to an accuracy of +/- 20mm. The surveyed coordinates replace the planned coordinates in the database. Downhole survey data was collected using an Axis Mining Technology Champ North Seeking Gyro tool. Surveys are undertaken on 10m intervals as the tool is removed from the drillholes once the drillhole is completed. All DD core is orientated using a Reflex ACT device and detailed structural measurements and logging is carried out. Historical Drilling The Old Highway Prospect was discovered by regional Percussion Rotary Air Blast Drilling (RAB) and AC drilling completed in 2005 and 2006 by Sandfire Resources. Drilling continued sporadically from 2006 through to 2014, with a total of 628 exploration holes completed for a total of 44,659.2 m, including mainly AC, RAB, and RC drilling, plus minor DD drilling.
ASX:CYL
catalystmetals.com.au
29
Between May 2020 and April 2021, a total of 94,167 metres of RC drilling and ten diamond holes for a total of 3,974 metres were completed. In addition, 12 diamond holes were drilled for geotechnical and specific gravity, totalling approximately 1,903 metres. Further Resource definition drilling on a 50m x 50m spacing was undertaken in the second half of 2021 in the Central-East area of the prospect to further delineate mineralisation at depth. A total of 3,747m was achieved. Toward the end of 2021 a DD program on a 50m x 100m spacing was also completed to test down-dip extension of Central Deeps, totalling 5,219.2m. Preliminary open pit & underground design work was prepared including geotechnical & hydrology studies. Metallurgical test works were also conducted. DD drilling size varies from PQ to NQ depending on the purpose of the hole (geotechnical, structural, specific gravity, metallurgical testing) and the depth reached. Most of the holes was however drilled HQ. Historical RC & DD drill hole collars were surveyed using an RTK-GPS or a DGPS and downhole surveys completed using a gyro instrument. Sampling and Sub-Sampling Techniques Catalyst has undertaken both surface RC and DD drilling at the Old Highway deposit since acquiring the project. RC samples were collected for each metre drilled and passed through a cyclone and cone splitter to produce a 2 kg to 4 kg sample for assay into calico bags. Depending on the oxidation state of the rock, the sample weight varied between three and five kilograms. The RC drilling and sampling were supervised at the drill site by a company sampler and geologist. The cone splitter has double chutes for field duplicates with infinite adjustment between 4 – 15% per sample chute. The cyclone was cleaned using compressed air after every sample and the cyclone was cleaned every 40 m, or more regularly at the geologists' discretion. Most of the RC samples were despatched to the Intertek (ITK) laboratory in Perth for gold fire assay analysis until February 2026, after which they were sent to SGS and BV. Occasional despatches were sent to ALS and Plutonic site lab depending on laboratory availability. Half cut diamond core was sampled on 1m intervals or to geological contacts, with sample lengths varying between 0.1 m to 1.3 m. Whole core sampling was instigated for broken/sheared zones which could not be cut. This resolved any possible biasing issues with 1/2 core grab samples within these incompetent fractured and sheared zones. Surface DD core samples were sent to several labs, the majority to the Plutonic onsite lab (PAL_DIBK and FA40) and the remainder to ALS (Au-AA26).
ASX:CYL
catalystmetals.com.au
30
Sample preparation and analytical methods for each lab are detailed below: Plutonic onsite lab by PAL method (PAL_DIBK): o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o A nominal 500g riffle split sample is used for PAL assaying for 1 hour leach cycle o PAL 1000 grind check ensures a minimum of 95% passing 75 μm sieve size. o Sample re-assay or duplicate samples are taken from the retained original crushed sample Plutonic onsite lab by Fire Assay method (FA40): o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o 1-1.5kg riffle split for pulverisation o Pulverise to 85% passing 75μm o Scoop 250-300g aliquot for lead collection Fire Assay 40g charge with AAS finish ALS laboratory: o Sample sorting and drying (DRY-21). o Core sample is coarse crushed (CRU-21), RC samples not crushed. o Pulverise entire sample to a particle size of 85% passing 75µm (PUL-24). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (Au-AA26). BV laboratory: o Sample sorting and drying (PR001). o Entire core sample is crushed to 10mm (PR102), RC samples not crushed. o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 90% passing 75µm (PR303). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (FA450). SGS laboratory: o Sample sorting and drying at 105°C (G_DRY_KG). o Entire core sample is crushed to a nominal 90% passing 2mm (G_CRU_KG). o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 85% passing 75µm (G_PUL). o 200g aliquot for lead collection Fire Assay 50g charge with AAS finish (GO_FAP50V10). ITK laboratory: o Sample sorting and drying at 105°C. o Entire sample is crushed to a nominal 90% passing 2mm (SPO3) o Riffle splitting to obtain between 1.5 to 3kg. o Pulverising to a particle size of 90% passing 75µm (SPO3). o 200g sample aliquot for lead collection by Fire Assay 25g and 50g charges with ICP-OES finish (FA25/OE02 and FA50/OE02).
ASX:CYL
catalystmetals.com.au
31
A summary of samples collected by Catalyst and used for the resource estimate are detailed below in Table 3. Drill Type
ALS
BV
ITK
FA50
FA50
FA25/FA50
RC samples
5
17,832
DD samples
1,413
4,314
TOTAL
1,418
4,314
17,832
PLUTONIC FA40
SGS
PAL_DIBK
FA50
3,831
TOTAL 21,668
220
2,615
169
8,731
4,051
2,615
169
30,399
Table 3 – Summary of Catalyst sample types
Quality Assurance and Quality Control (QAQC) samples are included in each sample batch and are dispatched to the assaying laboratory to measure the accuracy and precision of the returned assays. QAQC samples inserted into the sample stream include: •
• • •
Certified Reference Material (CRM) were submitted at an average rate of 4% of the total samples. CRMs are of similar grade tenor to the grades to be expected from sampling of the deposit. They were selected based on their grade range and mineralogical properties with an emphasis on sulphide ores. Coarse 40mm blanks were inserted at an average rate of 3% of the total samples RC field duplicates were inserted at an average rate of 2% of the total samples A mix of field duplicates (1/4 core) and coarse crush duplicates were inserted in the DD drilling, at an average rate of 1% of the total primary samples.
Quality control samples were inserted at an average rate of 10% of the total samples. Crush sizing analysis is conducted randomly by the commercial laboratories as part of their QC process. Pulp residues are expected to have 90% passing ≤75μm. This data is monitored by the Laboratory Supervisor. Grind times can be lengthened accordingly. Current procedures dictate a process of validation and checking of laboratory results when the assay data is returned by the laboratory upon loading into the independently managed Quest database. A routine set of plots and checks are undertaken, and if results fall outside of the expected limits, re-assaying of failing samples is requested. QAQC reports are generated by the database administrator and documented from automated database routines. The sample preparation protocols and sample sizes are considered appropriate for the style of mineralisation encountered and should provide representative results. Historical Sampling Under Sandfire ownership, RC drill chips samples have been collected as 1 m samples split on the cyclone, using a riffle or cone splitter. Trials were conducted to compare the performance of the riffle and cone splitters with the later favoured. To maintain appropriate sample quality, wet samples were left to dry in polyweave bags before being resampled using a portable riffle splitter. Despite these samples being dry at the time of re-sampling, they are recorded in the database as ‘Wet.’ This notes that the samples may be of poor or suspect quality due to sample Preparation Errors (PE) and the potential loss of fines. DD samples length varies depending on the core size (PQ / HQ / NQ) and the purpose of the hole (geotechnical, structural, specific gravity, metallurgical testing) from 0.1m to 3m.
ASX:CYL
catalystmetals.com.au
32
Sample Analysis Method The Pulverising and Leach (PAL) method utilised at the Plutonic onsite lab is not considered to be a total gold analysis, however the larger sample size (500g) still produced a representative and comparable result. The majority of the samples used the fire assay (50g) technique by AAS method which is considered to be a total gold analysis. For the historical drilling, gold was determined by fire assay using the classical lead collection technique with a nominal 50g charge. Although sample collection, sample preparation, sample logging and analytical techniques have varied over the Project’s history, all can be considered as industry standard at the time of drilling. Regional and Local Geology The Old Highway deposit occurs within the Padbury Basin and is located within the unit informally known as the Cow Hole Bore Member (Figure 1). The Cow Hole Bore Member consists of a thick sedimentary package composed of siltstones, lithic arenite/wackes, quartz arenite/wackes, and pebble conglomerates. Fining upward sequences are seen throughout the Cow Hole Bore Member within the Old Highway Prospect where sediments are fining to the north. Structural measurements completed on core samples indicate a consistent steep dip to the north-northwest (87° -> 346°).
Figure 1: Regional Geology of Old Highway Deposit (Grid: MGA94, Zone 50)
The Old Highway gold mineralisation is hosted within the northeast-southwest trending Old Highway Shear Zone (MGA grid) as shown in Figure 2. The Old Highway Shear Zone is characterised by a broad zone of tightly spaced shear fabric that transects the Cow Hole Bore Member sediments. This fabric occurs contemporaneously with and post an early sericite fabric that defines poorly developed layer parallel shear zones. Two stages of later chlorite shear fabrics transect the bedding. The first chlorite shear fabric occurs in
ASX:CYL
catalystmetals.com.au
33
association with the second phase of veining. The second chlorite fabric is potentially related to late brittle deformation Gold mineralisation is concentrated where the faults within the OH Shear Corridor cross-cut the coarse grained sediments (CG sediments). The CG sediments are likely to have provided a larger rheological contrast than the finer grained sediments and thus are key to the constraint of mineralisation.
Figure 2: Old Highway representative local geological map with Resource Extension Drill targets.
Geological Interpretation A total of 39,472.8m m of drilling from 125 reverse circulation (RC) drill holes and 69 diamond drillholes (DD) and diamond tails completed by Catalyst were available for interpretation of the MRE as shown in Figure 3.
ASX:CYL
catalystmetals.com.au
34
Figure 3: Old Highway Plan view – drilling type and Mineralisation domains by zones
The Old Highway (OH) Shear Corridor to which the OH gold mineralisation is associated with has a strike length of approximately 3,300 m, an average width of 120 m, and extends for up to 500 m down dip to 50 mRL. The mineralised domains strike northeast–southwest and are steeply northwest dipping to sub-vertical. The narrower and less continuous Wilthorpe Zone lies 160m to the northwest of the OH Shear corridor and has a more limited strike length of about 600m. Mineralisation domains have been interpreted primarily using geological logging and the location downhole of geological contacts, based on lithology, grade distribution, major faults and geometry. Interpretation of the mineralisation has been undertaken in Seequent Leapfrog Geo™ software using all available drillholes. Intercepts correlating to gold mineralisation and underpinned by strike continuity have been independently identified and manually selected within Seequent Leapfrog Geo ™ prior to creation of implicit volume models. A nominal cut-off grade of 0.2 g/t Au, and a minimum downhole length of 2 m was used to guide the geological continuity of the interpreted mineralisation lodes. Selection of the cut-off grade was based on statistical and spatial analysis of composite data indicating a natural mineralisation population exists above 0.2 g/t Au. Within the mineralised wireframe, if an intercept fell below the nominal cut-off but continuity was supported by host lithologies and mineralisation style, the intercept was retained for continuity purposes due to the commodity and the style of deposit. The geological model is comprised of a total of 30 estimation domains grouped into 5 main zones along a 3,300 m mineralised strike length. The five main zones are West, Main West, Main, Central West and Central as shown in Figure 4 and Figure 5 below. Mineralised domains can vary in thickness from approximately 0.5 m and up to 40 m. Weathering surfaces have been created by interpreting the existing logging for oxidation state and have been extended laterally beyond the limits of the Mineral Resource block model. The data density and regularity were considered adequate for the definition of the geological boundaries, which were used to define spatial zones for resource estimation.
ASX:CYL
catalystmetals.com.au
35
CYL considers confidence in mineralisation continuity and distribution, as implied within the Mineral Resource estimate classification of Indicated and Inferred, is moderate to high, given the regularised drill pattern, drill centre spacing (30 m) informing these Mineral Resources.
Figure 4: Old Highway Long Section view showing the 5 main zones and domain groupings
Figure 5: Old Highway Cross-section on Domain 4010 in Central zone with 1m composites (20m wide vertical window)
Estimation Methodology All geological domains used in the MRE were constructed in Leapfrog software. Block modelling and grade interpolation have been carried out using Surpac software. Statistical analysis has been completed using Supervisor software.
ASX:CYL
catalystmetals.com.au
36
Block model constraints were created by applying the interpreted mineralised domain wireframes. Subcelling in all domains was 1.25 m x 1.25 m x 1.25 m to accurately reflect the volumes of the interpreted wireframes. All drillhole assay samples have been uniquely flagged according to the mineralisation domains. All drillholes are composited to 1m downhole using a best-fit methodology and 0.5 m minimum threshold on inclusions. A small number of residual composites were retained in the estimation. RAB and AC holes were excluded from the composites and the estimation. The geological model is comprised of a total of 30 estimation domains grouped into five main areas as detailed in Table 4.
Area
West
Main West
Main
Central West
Central
Domain 1010 1020 1040 1050 1060 2005 2010 2020 2030 2060 2070 2080 2090 2510 2520 2530 2540 2550 2560 3010 3020 3030 3040 4010 4020 4030 4040 4050 4060 4070
Description other name north lode mid north lode 100 main lode main lode minor south lode unestimated lode north lode main lode main lode 200 mid south lode trace lode minor south lode south lode main lode north lode minor north lode 250 minor north lode minor mid lode south lode main central west lode main lode 300 & 350 central west lode central west south lode main Central lode deep north lode main north lode 400 oblique trace lode far north lode minor north lode deep south lode
Table 4 – Old Highway Estimation Domains
The distribution of gold grades within the mineralised lenses is highly variable and is characterised by distinct cohesive regions of higher tenor gold grades. The higher tenor gold grades are often associated with crosscutting faults and with clusters of individual values exceeding 10 g/t Au.
ASX:CYL
catalystmetals.com.au
37
Whilst these higher-grade zones appear reasonably cohesive, they are manifested by a high-degree of shortscale variability, making it difficult to manually interpret constraining domains. These internal; high-grade regions are often surrounded by peripheral regions of lower grade mineralisation that are also highly variable. The higher tenor gold grades are often associated with cross-cutting faults and with clusters of individual values exceeding 10 g/t Au. Raw Coefficients of Variation (CoV) are typically in the order of 0.4 to 7.8, indicating moderate to high grade variability. The moderate to high grade variability and complex spatial continuity of high grades at OHW requires a pseudo non-linear approach to deal with these high grades during estimation. A traditional approach of physical domaining, assay cutting, and linear estimation (IDW or OK) is considered inadequate in dealing with this complexity. The estimation method implemented combines Categorical Indicator Kriging (CIK) to define internal estimation sub-domains, together with applying distance limiting at chosen grade thresholds to restrict the influence of the high and extreme grade values during grade interpolation. The CIK methodology has been utilised for the estimation of all 30 domains. Prior to estimation, a reference surface for each estimation domain was exported from Leapfrog. This is calculated as the best fit surface using the hanging wall and footwall surfaces. The reference surface was imported into Surpac and a dip and dip-direction value of each triangle facet was calculated. These orientations are then imported into the Surpac block model to provide information for dynamic search and variogram model orientation during interpolation. Dynamic estimation has been applied for estimating the CIK indicators and gold grades. Categorical Indicator Kriging (CIK) Workflow Two Categorical Indicator values are determined for the CIK domains: • •
A low-grade (LG) indicator assigned to differentiate between background ‘waste’ and low-tenor mineralisation. A high-grade (HG) indicator assigned to define broad areas of consistent higher-tenor mineralisation.
Variograms were generated for the LG, MG and HG indicators for the main Central domain 4010. The variogram and estimation parameters for this domain were then applied to all the other domains that comprise the Old Highway mineralised system. The CIK indicators were estimated using Ordinary Kriging into a finely gridded block model with block dimensions of 1.25m x 1.25m x 1.25m. The small block size for the indicator process is beneficial for creating categorical sub-domains at resolution which can be used to accurately back-flag composite data. Three categorical sub-domains were generated: low-grade (LG), medium-grade (MG) and high-grade (HG) areas. The HG sub-domain was based on an indicator probability threshold of 0.35 and the LG sub-domain was based on an indicator probability threshold of 0.65. The MG sub-domain is assigned to blocks that do not satisfy either the HG or LG sub-domain criteria. The three categorical block model sub-domains (HG, MG and LG) were used to ‘back-flag’ the 1m composites from each mine area, thus creating a separate composite file for each sub-domain. The assay top-cuts have been applied to the sub-domain composite files. The top-cuts are generally between the 97th to 99.9th percentile of the distribution and have been aimed at globally limiting extreme values only. In this estimation methodology, top-cuts are not used as the primary tool to control metal risk. The use of grade thresholds and distance limiting is considered a more objective and influential method in
ASX:CYL
catalystmetals.com.au
38
controlling metal risk created by over-estimation from isolated high-grade samples. This more accurately represents the localised, discontinuous nature of high-grade gold mineralisation. Grade thresholds for distance limiting have been determined from log-probability plots and detailed review of the spatial locations of the gold grades. The indicator cut-offs, assay top cuts and grade distance limiting thresholds for each domain are summarised below in Table 5.
ASX:CYL
catalystmetals.com.au
39
Area
West
Main West
Main (250)
Central West
Central (400)
Domain
Categorical Indicator
1010 1010 1010 1020 1020 1020 1040 1040 1040 1050 1050 1050 1060 1060 1060 2005 2005 2005 2010 2010 2010 2020 2020 2020 2030 2030 2030 2060 2060 2060 2070 2070 2070 2080 2080 2080 2090 2090 2090 2510 2510 2510 2520 2520 2520 2530 2530 2530 2540 2540 2540 2550 2550 2550 2560 2560 2560 3010 3010 3010 3020 3020 3020 3030 3030 3030 3040 3040 3040 4010 4010 4010 4020 4020 4020 4030 4030 4030 4040 4040 4040 4050 4050 4050 4060 4060 4060 4070 4070 4070
LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG
Indicator Assay Top Cut-offs Cut (Au (Au g/t) g/t) 0.08 0.4 2.5 0.9 20 0.12 0.3 1.5 0.8 6 0.1 0.1 1.8 1.2 8 0.09 0.09 1 0.7 6 0.08 0.1 1.8 0.9 3 0.12 0.12 1.2 0.8 12 0.1 0.1 1.2 1.2 4 0.08 0.12 1.2 1 9 0.08 0.12 2.5 0.9 9 0.12 0.1 1.2 0.9 4 0.1 0.1 0.8 0.9 3 0.09 0.07 1.1 1.2 4.5 0.1 0.1 1 0.9 5 0.1 1 9 1.2 20 0.12 0.12 1.2 0.8 4.5 0.09 0.08 1 0.9 4.5 0.09 0.15 1.2 0.5 4 0.12 0.12 1.5 0.8 5 0.08 0.1 1.8 0.6 5 0.09 0.1 3 1 9 0.1 0.1 1.2 0.9 15 0.12 0.12 2 1 15 0.08 0.6 2 0.8 20 0.1 1.8 15 1 90 0.1 0.3 3 1 30 0.1 0.12 1.2 0.9 15 0.1 0.1 1 0.9 3 0.15 0.1 0.9 1.2 12 0.1 0.1 0.8 0.6 15 0.2 0.18 2 1.8 35
Grade Threshold (Au g/t) 0.08 0.9 4 0.12 0.8 3 0.09 1.2 6 0.08 0.6 4 0.07 0.8 2 0.1 0.8 10 0.09 0.9 3 0.08 0.8 7 0.08 0.9 4 0.08 0.8 3 0.08 0.7 2.5 0.06 0.9 3 0.09 0.7 4 0.2 1.5 9 0.1 0.8 2.5 0.07 0.8 3.5 0.08 0.5 3 0.1 0.7 3 0.04 1 3 0.07 1 5 0.08 0.8 5 0.1 1 7 0.1 0.9 7 0.2 1.8 30 0.12 1 12 0.1 0.8 8 0.06 0.8 2.5 0.5 0.8 7 0.07 0.6 8 0.15 1.2 20
Grade Limiting Distances (metres) 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15
Table 5 – Old Highway Estimation Indicators by Domain
Prior to grade estimation, sub-domain codes from the 1.25m resolution block model are imported into a 2.5m x 2.5m x 2.5m resolution model and the proportion of LG, MG and HG is calculated for each 2.5m block.
ASX:CYL
catalystmetals.com.au
40
The choice of a 2.5m x 2.5m x 2.5m block size reflects the likely mining selectivity achievable for both open pit and underground mining scenarios. Grade estimation for the LG, MG and HG domains has been undertaken in Surpac software using OK with grade threshold distance limiting applied by domain. Search ellipse orientation and variogram orientations are drawn from the pre-populated dynamic anisotropy information recorded in each block. Final block grades at a 2.5m x 2.5m x 2.5m block resolution were calculated by weighting the estimated grades for each sub-domain by the relevant domain proportion. The parent estimation block size was 2.5m x 2.5m x 2.5m. A single-pass estimation strategy has been used across all domains, whereby an average search range of 120m by 60m by 30m (vertical height) and minimum 4 to maximum 12 composites has been utilised to estimate a grade. It is possible that up to 36 composites can be used to estimate a parent block where there is a proportion of all three sub-domains present. Octant restrictions have not been used. Model validation was completed to check that the grade estimates within the model were an appropriate reflection of the underlying composite sample data, and to confirm that the interpolation parameters were applied as intended. Checks of the estimated block grade with the corresponding composite dataset were completed using several approaches involving both numerical and spatial aspects as follows: • • • •
Semi-Local: Using swath plots in X, Y and Z directions comparing the estimates to the sample data. Local: Visual inspection of the estimated block grades viewed in conjunction with the sample data. No selective mining units were assumed in the resource estimate. Only Au grade was estimated.
The final grade model for the five main zones in relation to the informing drill pierce points are shown below in Figure 6.
Figure 6: Old Highway Long section indicated & inferred blocks (200m thick vertical section with, blocks >1g/t, 1m composites)
ASX:CYL
catalystmetals.com.au
41
Figure 7: Old Highway oblique view looking North of Central Zone Main Estimation Domain 4010 (blocks> 1 g/t ; 1m composites)
Bulk Density Density has been assigned to the resource using interpreted weathering surfaces determined from drillhole logging using water immersion density measurements from the diamond drill core. The following densities were coded into the Surpac model using the weathering domains generated in Leapfrog software: • • •
Oxide = 1.72 Transitional = 2.16 Fresh = 2.79
Classification Criteria Mineral Resources were classified as Indicated and Inferred to appropriately represent confidence and risk with respect to data quality, drill hole spacing, geological and grade continuity and mineralisation volumes. Additional considerations were the stage of project assessment, amount of DD and RC drilling undertaken and current understanding of mineralisation controls. The drilling, surveying and sampling undertaken, and analytical methods and quality controls used, are appropriate for the style of deposit under consideration. Indicated Mineral Resources were defined where a moderate level of geological confidence in geometry, continuity and grade was demonstrated, and were identified as areas where: • •
The portions of the MRE classified as Indicated have been flagged in areas of the model where the average distance to the nearest informing composited drill intercept was nominally 30m or closer. Blocks were interpolated with a neighbourhood largely informed by the maximum number of samples.
Inferred Mineral Resources were defined where a low to moderate level of geological confidence in geometry, continuity and grade was demonstrated, and were identified as areas where:
ASX:CYL
catalystmetals.com.au
42
•
The portions of the MRE classified as Inferred typically represents minor lodes or lower grade portions of the larger domains where geological continuity is present but not consistently confirmed by 30m spaced composited drill data.
•
The Inferred Resources were interpolated where the average distance to the nearest composited drill intercept was nominally 80m or closer. The extrapolation of the resource was limited to a maximum of 80m past the last sample point.
Further considerations of resource classification include; •
data type and quality
•
drilling type
•
drilling orientations
•
down hole surveys
•
sampling, and
•
assaying methods, and
•
geological confidence and geostatistical considerations.
Mineralisation within the block model which did not satisfy the criteria for classification as Mineral Resources remained unclassified. The delineation of Indicated and Inferred Mineral Resources appropriately reflects the Competent Person’s view on continuity and risk at the deposit and is shown in Figure 8 and Figure 9.
Figure 8: Long Section of MRE Estimate Classification – Green = Indicated, Blue = Inferred (200m section window)
ASX:CYL
catalystmetals.com.au
43
Figure 9: Oblique View of the main Central domain 4010 MRE Estimate Classification – Green = Indicated, Blue = Inferred (1m composites)
Cut-off Grade The Underground component of the MRE has been reported at a 1.5 g/t Au cut-off for fresh material only. The cut-off grade has been derived from current mining and processing costs and metallurgical parameters used for the operating K2 Underground mine and at the nearby Plutonic Underground Mine. The Open Pit portion has been reported at a 0.5 g/t Au for oxide and transitional material only. The cut-off grade was derived from recent mining and processing costs and metallurgical parameters used at the recently completed Trident West Open Pit. Assessment of Reasonable Prospects for Eventual Economic Extraction The OHW Mineral Resource (MRE) has been undertaken with a focus on delineating areas of the MRE with Reasonable Prospects for Eventual Economic Extraction (RPEEE) by both open pit and underground mining methods. The following criteria were considered in determining the RPEEE: • • • • • •
Deposit scale Geometry, in particular mineralisation true width and minimum mining width Proximity to ground surface Established ORE/existing mine plan for material above the Underground Resource Access to existing critical infrastructure Current gold price
The Underground MRE has been reported at a 1.5 g/t Au and constrained to fresh material only to a maximum vertical depth of 500m below the topographic surface. Underground mining selectivity is assumed to include a minimum mining width of 1.5m, minimum stope length of 5m, and a minimum stope height of 5m. The Open Pit MRE has been reported at a 0.5 g/t Au and constrained to oxide and transitional material only. Mining selectivity is assumed to be on 2.5m vertical benches with a 5m x 5m Selective Mining Unit (SMU). The Mineral Resource is considered to have reasonable prospects for eventual economic extraction given the access to critical infrastructure, the volume and grade of mineralisation available for mining and the RPEEE criteria which have been applied prior to reporting the Mineral Resource.
ASX:CYL
catalystmetals.com.au
44
The grade-tonnage curves for the current Old Highway classified resource (2026) and the previous MRE (2025) are shown below in Figure 10.
Figure 10: Old Highway MRE August 2026 vs MRE May 2025 Grade and Tonnage Curve – Indicated and Inferred only
Mining and Depletion No historical mining has been undertaken at Old Highway. No dilution or cost factors were applied to the estimate. Metallurgy The nearby Plutonic and Plutonic East Underground gold mines are current operating mines and there are no material metallurgical issues that are known to exist. It is assumed the ore will be trucked and processed at the Plutonic Gold Plant. No metallurgical recovery factors were applied to the Mineral Resources or resource tabulations.
ASX:CYL
catalystmetals.com.au
45
Material information summary as required under ASX Listing Rule 5.9. ORE RESERVE ESTIMATES (Old Highway) Material Assumptions and Outcomes All material and economic assumptions, and forecast financial information related to the Ore Reserve Estimate are outlined below: Level of Study The declaration of Old Highway Ore Reserve Estimation is generated from a Pre-Feasibility level assessment. The study has had both internal Catalyst personnel and external consultants provide inputs into the mine plan with appropriate geotechnical, hydrological, equipment, metallurgical and mining method information. The level of accuracy of the mine plan is technically achievable and economically viable. Classification A ‘Probable Ore Reserve’ is the economically mineable portion of an Indicated Mineral Resource. The Ore Reserve classification reflects the Competent Person's view of the deposit. Only Probable Ore Reserves have been declared and are based on Indicated Mineral Resources following consideration of Modifying Factors. No Proved Ore Reserves have been declared, as no Measured Mineral Resources are reported within the MRE. Mineral Resources are reported inclusive of Ore Reserves, and the Ore Reserve is a subset of, and spatially contained within, the MRE. Any Inferred or Unclassified Mineral Resources captured within the mine designs have been assigned a zero grade and are treated as waste. Mining Method The Old Highway mine plan considers a combination of open pit and underground mining methods. A number of open pits are planned to be mined utilising a contractor mining fleet with commonly used 200t excavators, 120t excavators and 60t and 90t haul trucks. A single underground mine is planned to be mined with a mining fleet under Catalyst’s existing owner-operator model. Underground mining practices will operate using similar extraction methods and mining equipment to the nearby Plutonic underground operations. On completion of one of the open pits, the Central pit, a portal will be established, allowing commencement of underground mining. Underground mining methods at Old Highway will utilise longhole stoping methods with a majority of stopes backfilled using cemented rockfill, loose rockfill, and a minority of open stoping with pillars where stopes aren’t backfilled. Mining will occur in a series of bottom-up extraction panels. Processing Processing of the Old Highway ore is proposed to be via the Plutonic processing plant. The Plutonic processing plant is an established processing plant. Operating costs for the processing plant have been estimated using recent operating history. Significant metallurgical testwork to a pre-feasibility study level has been performed on the Old Highway gold deposit. Gold recoveries of 94% have been adopted for the open pits and 88% for the underground. Cut-off Grade Open pit and underground cut-off grades account for all mining, processing, surface haulage and administrative costs utilising a A$4,500 gold price. All royalties and metallurgical factors are also applied in the cut-off grade calculations. Royalties include state royalties of 2.5% and a 0.5% third-party royalty.
ASX:CYL
catalystmetals.com.au
46
Underground stope optimisation inputs use a 2.5g/t Au cut-off grade, with incremental stopes extracted at a 1.5g/t cut-off grade where development is already in place. A development cut-off grade of 1.0 g/t has been applied. All areas are then assessed for economic viability. For open pits a cut-off grade of 0.6 g/t has been applied. Estimation Methodology The underground Ore Reserves estimate is reported within an underground Deswik Shape Optimiser (DSO) evaluation from the resource model. A minimum mining width of 3.5m with 0.5m of both footwall and hanging wall dilution have been added to the stope shapes. This dilution is estimated at resource model grade. Stope strike lengths of 15m and a floor-to-floor level spacing of 20m have been applied in the design. A mining recovery factor of 95% has been applied to backfilled stopes to account for bogging losses, with a 75% mining recovery factor applied to open stopes to account for in-situ pillars and bogging losses. Development has no dilution and 100% mining recovery applied. For open pits representative dig blocks generated to account for ore loss and dilution factors. Dilution factors of 17% in oxide, 19% in transitional and 21% in fresh material have been applied in the open pit Ore Reserve A mining recovery factor of 93%, or stated as a 7% ore loss allowance, has been applied in the open pit Ore Reserve. Open pit optimisations were completed using Whittle software, based on a A$4,500/oz gold price and recent contractor mining cost inputs. Pit design slope angles are based on the most current geotechnical information. Geotechnical parameters have been applied in both open pit and underground mine design as per the geotechnical assessment. The pit designs consider a single lane ramp for the lower one third of the pit with the upper two thirds using a dual lane ramp. Environmental, social and other factors have been considered. Other Material Factors, Approvals and Infrastructure Processing plant and tailings storage facilities are located at Plutonic and will be utilised for the processing of Old Highway ore and deposition of resulting tailings. Development of Old Highway will require pre-production capital for the development of:
haul roads site clearing
establishment and dis-establishment of all facilities including workshop, offices and ablutions, fuel storage, explosives magazine, power, water, sundries
mobilisation and demobilisation
Capital estimates for these site works were provided by a contractor and have been considered in the Old Highway economic assessment. Labour will be sourced primarily on a fly-in fly-out basis, via the Plutonic mine site accommodation, and air strip facilities. Power will be provided via diesel generators. Surface haulage rates have been applied based on current contractor costs. The Ore Reserve has been completed to a Pre-Feasibility study level of assessment.
ASX:CYL
catalystmetals.com.au
47
Modifying factors including dilution and recovery, mining and processing recoveries, geotechnical parameters and cost inputs and resulting application are appropriate for the level of study. Granted mining leases cover all the proposed mining and processing assets. Historical environmental baseline surveys, test work and studies have been completed on the Old Highway deposit. Catalyst will be progressing with mining approvals and permits as the project advances and sees no impediments to granting of these approvals and permits. A A$4,500/oz gold price, and a discount rate of 7% have been used in NPV modelling. Sensitivities have been conducted on gold price, costs, and metallurgical recovery with the project most sensitive to gold price.
ASX:CYL
catalystmetals.com.au
48
ORE RESERVE ESTIMATES (Plutonic East) Material Assumptions and Outcomes All material and economic assumptions, and forecast financial information related to the Ore Reserve Estimate are outlined below: Level of Study The declaration of the Plutonic East underground Ore Reserve Estimation is generated on the basis that it is a currently operating mine. The mine plan considers the appropriate geotechnical, hydrological, equipment, metallurgical and mining method information. The level of accuracy of the mine plan is technically achievable and economically viable. Classification A ‘Probable Ore Reserve’ is the economically mineable portion of an Indicated Mineral Resource. The Ore Reserve classification reflects the Competent Person's view of the deposit. Only Probable Ore Reserves have been declared and are based on Indicated Mineral Resources following consideration of Modifying Factors. No Proved Ore Reserves have been declared, as no Measured Mineral Resources are reported within the MRE. Mineral Resources are reported inclusive of Ore Reserves, and the Ore Reserve is a subset of, and spatially contained within, the MRE. Any Inferred or Unclassified Mineral Resources captured within the mine designs have been assigned a zero grade and are treated as waste. Mining Method Plutonic East underground is currently in operation, utilising longhole open stoping as the mining method. Plutonic East has both long-hole flat and sub vertical dipping stoping. Plutonic East has a small percentage of historically mined stopes that were waste loose backfilled to provide overlying access and/or passive hangingwall support. The historic voids have been incorporated into the MRE, with an additional 2.5m depletion skin around the stope voids incorporated into the MRE. Processing The metallurgical characteristics of Plutonic East are well known, as Plutonic East ore is currently processed through the Plutonic processing plant. A metallurgical recovery of 84% was used in the cut-off grade for Plutonic East, which aligns with current actuals. Cut-off Grade Underground stopes are designed at a stope cut-off grade of 1.5g/t. A development cut-off grade of 0.5 g/t has been applied. All areas are then assessed for economic viability. Underground cut-off grades account for all mining, processing, surface haulage and administrative costs utilising a A$4,500 gold price. All royalties and metallurgical factors are also applied in the cutoff grade calculations. Estimation Methodology The underground Ore Reserves estimate is reported within manually designed stope shapes. A minimum mining width of 3m and additional unplanned dilution, outside the stope shape, of 10% has been applied at zero grade. A mining recovery factor of 90%, allowing for 10% of bogging losses has been applied. Minimum stope strike lengths of 10m and sublevel spacings derived from geotechnical parameters and based on location within the mine.
ASX:CYL
catalystmetals.com.au
49
Other Material Factors, Approvals, Infrastructure and Economic Assumptions Catalyst mines the Plutonic East deposit on an owner-operator basis. Plutonic East’s current mining costs have been used as an input to the mining cost estimate. Plutonic East’s proximity to Plutonic allows many synergies, including existing infrastructure, an existing employee pool, and systems and structures in place to run an underground mining operation. Plutonic East ore is currently processed at the Plutonic processing plant and so recent actual operating costs and metallurgical factors have been used. Granted mining leases cover all the proposed mining and processing assets. Other operating costs including power and administration have been estimated using recent actual operating history at the Plutonic East Gold Mine. Royalties are based on existing royalties with the Western Australian government. A A$4,500/oz gold price, and a discount rate of 7% have been used in NPV modelling. Sensitivities have been conducted on gold price, costs, and metallurgical recovery with the project most sensitive to gold price.
ASX:CYL
catalystmetals.com.au
50
ORE RESERVE ESTIMATES (Keillor) Material Assumptions and Outcomes All material and economic assumptions, and forecast financial information related to the Ore Reserve Estimate are outlined below: Level of Study The declaration of Keillor underground Ore Reserve Estimation is generated on the basis that is a currently operating mine. The mine plan considers the appropriate geotechnical, hydrological, equipment, metallurgical and mining method information. The level of accuracy of the mine plan is technically achievable and economically viable. The open pit Ore Reserve Estimation is at a pre-feasibility study level and the mine plan considers the appropriate geotechnical, hydrological, equipment, metallurgical and mining method information. The level of accuracy of the mine plan is technically achievable and economically viable. Classification A ‘Probable Ore Reserve’ is the economically mineable portion of an Indicated Mineral Resource. The Ore Reserve classification reflects the Competent Person's view of the deposit. Only Probable Ore Reserves have been declared and are based on Indicated Mineral Resources following consideration of Modifying Factors. No Proved Ore Reserves have been declared, as no Measured Mineral Resources are reported within the MRE. Mineral Resources are reported inclusive of Ore Reserves, and the Ore Reserve is a subset of, and spatially contained within, the MRE. Any Inferred or Unclassified Mineral Resources captured within the mine designs have been assigned a zero grade and are treated as waste. Mining Method Keillor underground is a currently operating underground mine, utilising longhole stoping mining methods. All open pit mining is proposed to be completed with a contractor mining fleet with commonly used 90t excavators and 60t haul trucks. Processing The metallurgical characteristics of Keillor are well known as the ore is currently being processed at the Plutonic processing plant. A metallurgical recovery factor of 94% has been applied based on actual performance through the Plutonic mill, with recent actual processing costs used in the applied cut-off grades and economic analysis. Cut-off Grade Underground stopes are designed at a minimum stope cut-off grade of 1.6g/t cut-off grade. A development cut-off grade of 0.6 g/t has been applied. All areas are then assessed for economic viability. Open pit cut-off grades of 0.6 g/t have been applied. Underground cut-off grades account for all mining, processing, surface haulage and administrative costs utilising a A$4,500 gold price. All royalties and metallurgical factors are also applied in the cutoff grade calculations. Estimation Methodology Underground stopes are designed with Deswik stope optimiser (DSO)
ASX:CYL
catalystmetals.com.au
51
DSO input parameters include a 1.6 g/t Au cut-off, minimum mining width 2.5m, minimum stope length of 10m, stope height of 15-20m and a gold price of A$4,500/oz. The orientation of DSO’s is variable depending on the geometry of the mineralisation. Dilution of 0.5 m on both HW and FW are included in the stope shapes at MRE grade. Mining recovery of 95% has been utilised in the stopes. In the open pit Ore Reserve representative dig blocks were generated to determine appropriate dilution and ore loss figures. Dilution factors of 17% in oxide, 19% in transitional and 21% in fresh material have been applied in the open pit Ore Reserve. A mining recovery factor of 93%, or stated as a 7% ore loss allowance, has been applied. Other Material Factors, Approvals, Infrastructure and Economic Assumptions Catalyst mines the Keillor deposit on an owner-operator basis, with open pit mining planned utilising contractor fleet. Keillor’s current mining costs have been used as an input to the mining cost estimate, in addition to contractor pricing for open pit mining. Keillor’s proximity to Plutonic allows many synergies, including existing infrastructure, an existing employee pool, and systems and structures in place to run an underground mining operation. Keillor ore is currently processed at the Plutonic processing plant and so recent actual operating costs and metallurgical factors have been used. Other operating costs including power and administration have been estimated using recent actual operating history at the Plutonic and Keillor mines. A A$4,500/oz gold price, and a discount rate of 7% have been used in NPV modelling. Sensitivities have been conducted on gold price, costs, and metallurgical recovery with the project most sensitive to gold price. Granted mining leases cover all the proposed mining and processing assets. Environment, social, and licensing aspects have been appropriately considered.
ASX:CYL
catalystmetals.com.au
52
This announcement has been approved for release by the Board of Directors of Catalyst Metals Limited. Investors and Media: Craig Dingley Catalyst Metals T: +61 (8) 6324 0900 [email protected] Competent person’s statement The information in this announcement that ,relates to the estimation and reporting of updated gold Mineral Resources at the Old Highway and Plutonic East underground deposits is based on information compiled by Mr Andrew Finch, BSc, a Competent Person who is a current Member of Australian Institute of Geoscientists (MAIG 3827). Mr Finch, Geology Manager, at Catalyst Metals Ltd has sufficient experience relevant to the style of mineralisation and deposit type under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Finch consents to the inclusion in the report of matters based on his information in the form and context in which it appears. The Mineral Resources estimates has been compiled in accordance with the guidelines defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012). The information in this announcement that relates to the estimation and reporting of updated gold Ore Reserves at the Plutonic East Underground deposit, Keillor and Old Highway, deposits is based on and fairly represents information and supporting documentation compiled by Mr Ross Moger BEng (Mining Engineering), a Competent Person who is a member of the Australasian Institute of Mining and Metallurgy (AUSIMM). Mr Ross Moger is a full-time employee of Catalyst Metals and is entitled to participate in the Catalyst Performance Rights Plan. Ross Moger has sufficient experience that is relevant to the style of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012). Mr Ross Moger consents to the inclusion in the report of the matters based on his information in the form and context in which they are presented. The Ore Reserve estimates has been compiled in accordance with the guidelines defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012). Compliance statement The information in this announcement that relates to a historical Catalyst estimate of ore reserves, mineral resources and production targets are extracted from ASX announcements referenced and available on the Company website www.catalystmetals.com.au and the ASX website (ASX code: CYL). Catalyst confirms that it is not aware of any new information or data that materially affects the information included in the original announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcement. Catalyst confirms that all material assumptions underpinning the production target, or the forecast financial information derived from a production target, in the initial announcement continue to apply and have not materially changed. Forward-looking statements This announcement contains forward looking statements. Wherever possible words such as “intends”, “expects”, “estimates”, “projects”, “believes”, and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken to occur or be achieved, have been used to identify these forward-looking statements. Although the forward looking statements included in this announcement reflect management’s current beliefs, based upon information currently available to management and based upon what management believes to be reasonable assumptions, the Company cannot be certain that actual results will be consistent with these forward-looking statements. A number of factors could cause events and achievements to differ materially from the results expressed or implied in the forward-looking statements. Forward- looking statements necessarily involve significant known and unknown risks, assumptions and uncertainties that may cause the Company’s actual results, events, prospects and opportunities to differ materially from those expressed or implied in the forward-looking statements. Accordingly prospective investors should not place undue reliance on forward-looking statements.
ASX:CYL
catalystmetals.com.au
53
APPENDIX 1 OLD HIGHWAY– JORC CODE, 2012 EDITION – TABLE 1 Section 1 Sampling Techniques and Data Old Highway Deposit (Criteria in this section apply to all succeeding sections.) Criteria
Commentary
Sampling techniques
• • •
• • • • • •
Drilling techniques
• •
Drill sample recovery
• • • •
Logging
• • • • •
• •
ASX:CYL
This release relates to the Mineral Resource Estimate (MRE) update for the Old Highway Deposit. All drilling data completed by Catalyst since acquisition of the ground to the current data cutoff date (5 August 2026) has been incorporated. The previous MRE released in May 2025 was based on all historical drilling only that was available as of 29 April 2025. A total of 39,472.8 m of drilling from 69 diamond and diamond tails (DD), and 125 reverse circulation (RC) holes have been completed by Catalyst since the previous MRE and form the basis of this Mineral Resource update.
The majority of holes have been drilled using RC only to an average depth of 140 m. The majority of the DD drilling utilised NQ size but a handful of holes had the top part done PQ and/or HQ before being followed by NQ core. The RC holes were sampled at a 1m interval from the rig mounted cyclone. The DD tails were sampled using PQ/HQ/NQ half core at 1m intervals or to geological boundaries. For DD samples, downhole depth is recorded by the drillers on core blocks after each core run. This was checked and compared to the measurements of the core. The Old Highway deposit has historically been sampled using numerous drilling and sampling techniques by previous operators which are assumed to have been to industry standards at that time. Reverse Circulation drilling was conducted utilizing a 5.75 inch face sampling bit. Diamond drilling utilised PQ core with a diameter of 85 mm, HQ core with a diameter of 63.5 mm, and NQ core with a diameter of 47.6 mm. Most RC drilling was bagged on 1 m intervals and an estimate of sample recovery has been made on the size of each sample. The DD core was jig-sawed back together and metre marked carefully. Discrepancies to core blocks are brought up with the drill contractor. Occasionally core loss blocks are inserted. Core recovery for the diamond drilling was based on the measured core returned for each 6m or 3m run. Overall drill core recovery is very good, with an average recovery of 98% through the mineralised zones. There is no known relationship between sample recovery and grade at Old Highway. All RC have been logged on 1m intervals. DD samples have been logged by qualified geologists to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. Logging is both qualitative and quantitative. Logging records include: depth from, depth to, lithology, texture, colour, alteration style, alteration intensity, alteration mineralogy, sulphide (percentage and type), quartz (percentage), veining, and general comments. Orientated core structural measurements are taken at relevant structures and where the foliation is relatively consistent. All drill core and RC chip trays are digitally photographed both wet and dry. All photos are stored on the Company’s servers, with the photographs from each hole contained within separate folders.
catalystmetals.com.au
54
Criteria
Commentary
Sub-sampling techniques and sample preparation
•
•
•
•
ASX:CYL
RC samples were collected for each metre drilled and passed through a cyclone and cone splitter to produce a two kg to four kg assay into calico bags. Depending on the oxidation state of the rock, the sample weight varied between three and five kilograms. The RC drilling and sampling were supervised at the drill site by a company sampler and geologist. The cone splitter has double chutes for field duplicates with infinite adjustment between 4 – 15% per sample chute. The cyclone was cleaned using compressed air after every sample and the cyclone was cleaned every 40m, or more regularly at the geologists' discretion. Most of the RC samples were despatched to the Intertek (ITK) laboratory in Perth for gold fire assay analysis. Most recent despatches were sent to Plutonic site lab (FA40 method) after the company ceased to use ITK’s services from early 2026. Half cut diamond core was sampled on 1m intervals or to geological contacts, with sample lengths varying between 0.25 m to 2 m. Whole core sampling was instigated for broken/sheared zones which could not be cut. This resolved any possible biasing issues with half core grab samples within incompetent fractured and sheared zones. DD core samples were sent to several labs: the majority to the Bureau Veritas (BV), the Plutonic onsite lab (on both assay method PAL & FA40), ALS and the remainder to SGS.
•
Sample preparation procedures for the Plutonic onsite lab by PAL method (PAL_DIBK) includes: o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o A nominal 500g riffle split sample is used for PAL assaying for 1 hour leach cycle o PAL 1000 Grind Check: A minimum of 95% passing 75 μm sieve size. o Sample re-assay or duplicate samples are taken from the retained original crushed sample
•
Sample preparation procedures for Plutonic onsite lab by Fire Assay method (FA40) includes: o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o 1-1.5kg riffle split for pulverisation o Pulverise to 85% passing 75μm o Scoop 250-300g aliquot for lead collection Fire Assay 40g charge with AAS finish
•
Sample preparation procedures at ALS laboratory includes: o Sample sorting and drying (DRY-21). o Core sample is coarse crushed (CRU-21), RC samples not crushed. o Pulverise entire sample to a particle size of 85% passing 75µm (PUL-24). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (Au-AA26).
•
Sample preparation procedures at BV laboratory includes: o Sample sorting and drying (PR001). o Entire core sample is crushed to 10mm (PR102). o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 90% passing 75µm (PR303). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (FA450).
•
Sample preparation procedures at SGS laboratory includes: o Sample sorting and drying at 105°C (G_DRY_KG). o Entire core sample is crushed to a nominal 90% passing 2mm (G_CRU_KG). o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 85% passing 75µm (G_PUL). o 200g aliquot for lead collection Fire Assay 50g charge with AAS finish (GO_FAP50V10).
•
Sample preparation procedures at ITK laboratory includes: o Sample sorting and drying at 105°C. o Entire sample is crushed to a nominal 90% passing 2mm (SPO3) o Riffle splitting to obtain between 1.5 to 3kg. o Pulverising to a particle size of 90% passing 75µm (SPO3). o 200g sample aliquot for lead collection by Fire Assay 25g and 50g charges with ICP-OES finish (FA25/OE02 and FA50/OE02).
catalystmetals.com.au
55
Criteria
Commentary
Drill Type
• Quality of assay data and laboratory tests
• •
• •
• • • • • •
Verification of sampling and assaying
• • • •
Location of data points
•
• • Data spacing and distribution
• •
Orientation of data in relation to geological structure
ASX:CYL
• •
ALS
BV
ITK
FA50
FA50
FA25/FA50
RC samples
5
DD samples
1,413
4,314
TOTAL
1,418
4,314
17,832
17,832
PLUTONIC FA40 3,831
SGS
PAL_DIBK
FA50
TOTAL 21,668
220
2,615
169
8,731
4,051
2,615
169
30,399
Sample preparation protocols and sample sizes are considered appropriate for the style of mineralisation encountered and should provide representative results. Fire assay gold analysis is considered to be total gold analysis. DD samples analysed at Plutonic onsite lab using PAL method (PAL_DIBK). The Pulverising and Leach (PAL) method is not considered to be a total gold analysis, however the larger sample size still produces a representative result. Samples were dried, crushed and pulverised prior to analysis. Certified Reference Material (CRM) were submitted at an average rate of 4% of the primary samples. CRMs are of similar grade tenor to those expected grades in the sampling and were selected based on their grade range and mineralogical properties with an emphasis on sulphide ores. Coarse 40mm blanks were inserted at an average rate of 2.5% of the primary samples. RC field duplicates were inserted at an average rate of 3% of the primary samples. A mix of field duplicates (1/2 & 1/4 core) and coarse crush duplicates were inserted in the DD drilling, at an average rate of 4% of the total samples. Quality control samples were inserted at an average rate of 9% of the primary samples. Crush sizing analysis is conducted randomly by the Laboratory as part of their QC process. Pulp residues are expected to have 90% passing ≤75μm. This data is monitored by the Laboratory Supervisor. Grind times can be lengthened accordingly. Current procedures dictate a process of validation and checking of laboratory results when data is returned by the laboratory as it is loaded into the independently managed Quest database. A standard set of plots and checks are undertaken, and if results fall outside of the expected limits, then re-assaying is requested. QAQC reports are generated by the database administrator and documented from automated routines out of the database. RC and diamond drilling data has been verified by the geologist first and then the Database Administrator before importing into the main Quest database (proprietary database system). RC and DD logging is completed electronically on laptops. Database protocols and rules are applied upon data entry. All drill data within site databases are regularly validated using both internal database systems and external validation tools. All drill collars were accurately surveyed by DGPS using the MGA94 Zone 50 coordinate system. Downhole survey data was collected using an Axis Mining Technology Champ North Seeking Gyro tool. Surveys are undertaken on 30m intervals as the tool is removed from the holes once the hole is completed. The diamond holes used NSGY tool with surveys collected on 5m intervals. Downhole surveys are visually inspected for anomalous changes in drill trace, (i.e does the drill hole deviate excessively). Resource Definition and Infill RC/DD drilling was completed on 25m to 50m spacings at the Central 400 and Main 200 zones to confirm controls on the mineralisation trends. Further extensional drilling on nominal 100 m spaced lines was completed on the Western, Eastern and Northern zones to test for extension to the mineralised zones and define the extents of the mineralised system. This drilling spacing is wide and considered exploratory in nature. The orientation of a majority of the drilling is approximately perpendicular to the strike and dip of the mineralisation and is unlikely to have introduced any sampling bias. Certain holes have drilled parallel to key structures, but density of drilling and drilling on other orientations has allowed detailed geological modelling of these structures and hence
catalystmetals.com.au
56
Criteria
Commentary any sampling bias in a single hole has been removed.
Sample security
• •
•
•
• •
• •
Audits or reviews
• •
The chain of custody is managed by Catalyst employees and contractors. Any unsampled drill core is kept in an unfenced core farm adjacent to the core cutting and processing shed. This is not regarded as a security risk due to the remote location of the mine with no community development near the mine. All core is photographed and records kept electronically. Geologists are responsible for marking the sample intervals and placement of Blanks and CRM’s within the sample lot. The Project Geologist and Senior Geologist complete quality control checks on both the Surface and Underground GC drilling data daily. Field Staff are primarily responsible for sampling of core, generating the sample numbers for core submission, creating a sample submission sheet, selecting and recording the CRMs to be sent to the laboratory and the transportation of the samples to the laboratory. Samples are tracked during shipping. Once a drillhole has been sampled, the sample intervals and checked geology documents are uploaded into the Quest database system managed by EarthSQL. The independent Database Administrator (DBA) merges the validated drilling data with the certified laboratory assay files where validation routines for QAQC are completed before database exports and reports are issued. Drill logs are kept in hard copy and electronically. Catalyst samples have been stored on site and delivered to the commercial laboratories in Perth by a Contracted Transport Company. Consignment notes have been used to track the samples. Operator sample security is assumed to be consistent and adequate. CRMs, blanks and duplicates are reviewed continuously and indicate that sampling and analysis has been completed appropriately with no significant issues discovered. No audit or reviews of sampling techniques have been undertaken however the data is managed by company geologist who has internal checks/protocols in place for all QA/QC.
Section 2 Reporting of Exploration Results Old Hifhway Deposit (Criteria listed in the preceding section also apply to this section.) Criteria
Commentary
Sampling techniques
• •
•
• • • • •
ASX:CYL
This release relates to the Mineral Resource Estimate (MRE) update for the Old Highway Deposit. All drilling data completed by Catalyst since acquisition of the ground to the current data cutoff date (5 August 2026) has been incorporated. The previous MRE released in May 2025 was based on all historical drilling only that was available as of 29 April 2025. A total of 39,472.8 m of drilling from 69 diamond and diamond tails (DD), and 125 reverse circulation (RC) holes have been completed by Catalyst since the previous MRE and form the basis of this Mineral Resource update.
The majority of holes have been drilled using RC only to an average depth of 140 m. The majority of the DD drilling utilised NQ size but a handful of holes had the top part done PQ and/or HQ before being followed by NQ core. The RC holes were sampled at a 1m interval from the rig mounted cyclone. The DD tails were sampled using PQ/HQ/NQ half core at 1m intervals or to geological boundaries. For DD samples, downhole depth is recorded by the drillers on core blocks after each core run. This was checked and compared to the measurements of the core.
catalystmetals.com.au
57
Criteria
Commentary •
Drilling techniques
•
Drill sample recovery
• • • • • • •
Logging
• •
• •
Sub-sampling techniques and sample preparation
•
• •
•
ASX:CYL
The Old Highway deposit has historically been sampled using numerous drilling and sampling techniques by previous operators which are assumed to have been to industry standards at that time. Reverse Circulation drilling was conducted utilizing a 5.75 inch face sampling bit. Diamond drilling utilised PQ core with a diameter of 85 mm, HQ core with a diameter of 63.5 mm, and NQ core with a diameter of 47.6 mm. Most RC drilling was bagged on 1 m intervals and an estimate of sample recovery has been made on the size of each sample. The DD core was jig-sawed back together and metre marked carefully. Discrepancies to core blocks are brought up with the drill contractor. Occasionally core loss blocks are inserted. Core recovery for the diamond drilling was based on the measured core returned for each 6m or 3m run. Overall drill core recovery is very good, with an average recovery of 98% through the mineralised zones. There is no known relationship between sample recovery and grade at Old Highway. All RC have been logged on 1m intervals. DD samples have been logged by qualified geologists to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. Logging is both qualitative and quantitative. Logging records include: depth from, depth to, lithology, texture, colour, alteration style, alteration intensity, alteration mineralogy, sulphide (percentage and type), quartz (percentage), veining, and general comments. Orientated core structural measurements are taken at relevant structures and where the foliation is relatively consistent. All drill core and RC chip trays are digitally photographed both wet and dry. All photos are stored on the Company’s servers, with the photographs from each hole contained within separate folders. RC samples were collected for each metre drilled and passed through a cyclone and cone splitter to produce a two kg to four kg assay into calico bags. Depending on the oxidation state of the rock, the sample weight varied between three and five kilograms. The RC drilling and sampling were supervised at the drill site by a company sampler and geologist. The cone splitter has double chutes for field duplicates with infinite adjustment between 4 – 15% per sample chute. The cyclone was cleaned using compressed air after every sample and the cyclone was cleaned every 40m, or more regularly at the geologists' discretion. Most of the RC samples were despatched to the Intertek (ITK) laboratory in Perth for gold fire assay analysis. Most recent despatches were sent to Plutonic site lab (FA40 method) after the company ceased to use ITK’s services from early 2026. Half cut diamond core was sampled on 1m intervals or to geological contacts, with sample lengths varying between 0.25 m to 2 m. Whole core sampling was instigated for broken/sheared zones which could not be cut. This resolved any possible biasing issues with half core grab samples within incompetent fractured and sheared zones. DD core samples were sent to several labs: the majority to the Bureau Veritas (BV), the Plutonic onsite lab (on both assay method PAL & FA40), ALS and the remainder to SGS.
•
Sample preparation procedures for the Plutonic onsite lab by PAL method (PAL_DIBK) includes: o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o A nominal 500g riffle split sample is used for PAL assaying for 1 hour leach cycle o PAL 1000 Grind Check: A minimum of 95% passing 75 μm sieve size. o Sample re-assay or duplicate samples are taken from the retained original crushed sample
•
Sample preparation procedures for Plutonic onsite lab by Fire Assay method (FA40) includes: o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o 1-1.5kg riffle split for pulverisation o Pulverise to 85% passing 75μm o Scoop 250-300g aliquot for lead collection Fire Assay 40g charge with AAS finish
catalystmetals.com.au
58
Criteria
Commentary •
Sample preparation procedures at ALS laboratory includes: o Sample sorting and drying (DRY-21). o Core sample is coarse crushed (CRU-21), RC samples not crushed. o Pulverise entire sample to a particle size of 85% passing 75µm (PUL-24). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (Au-AA26).
•
Sample preparation procedures at BV laboratory includes: o Sample sorting and drying (PR001). o Entire core sample is crushed to 10mm (PR102). o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 90% passing 75µm (PR303). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (FA450).
•
Sample preparation procedures at SGS laboratory includes: o Sample sorting and drying at 105°C (G_DRY_KG). o Entire core sample is crushed to a nominal 90% passing 2mm (G_CRU_KG). o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 85% passing 75µm (G_PUL). o 200g aliquot for lead collection Fire Assay 50g charge with AAS finish (GO_FAP50V10).
•
Sample preparation procedures at ITK laboratory includes: o Sample sorting and drying at 105°C. o Entire sample is crushed to a nominal 90% passing 2mm (SPO3) o Riffle splitting to obtain between 1.5 to 3kg. o Pulverising to a particle size of 90% passing 75µm (SPO3). o 200g sample aliquot for lead collection by Fire Assay 25g and 50g charges with ICP-OES finish (FA25/OE02 and FA50/OE02).
Drill Type
ALS
BV
ITK
FA50
FA50
FA25/FA50
RC samples
Quality of assay data and laboratory tests
ASX:CYL
5
17,832
DD samples
1,413
4,314
TOTAL
1,418
4,314
17,832
PLUTONIC FA40 3,831
SGS
PAL_DIBK
FA50
TOTAL 21,668
220
2,615
169
8,731
4,051
2,615
169
30,399
Sample preparation protocols and sample sizes are considered appropriate for the style of mineralisation encountered and should provide representative results. • Fire assay gold analysis is considered to be total gold analysis. • DD samples analysed at Plutonic onsite lab using PAL method (PAL_DIBK). The Pulverising and Leach (PAL) method is not considered to be a total gold analysis, however the larger sample size still produces a representative result. • Samples were dried, crushed and pulverised prior to analysis. • Certified Reference Material (CRM) were submitted at an average rate of 4% of the primary samples. CRMs are of similar grade tenor to those expected grades in the sampling and were selected based on their grade range and mineralogical properties with an emphasis on sulphide ores. • Coarse 40mm blanks were inserted at an average rate of 2.5% of the primary samples. • RC field duplicates were inserted at an average rate of 3% of the primary samples. • A mix of field duplicates (1/2 & 1/4 core) and coarse crush duplicates were inserted in the DD drilling, at an average rate of 4% of the total samples. • Quality control samples were inserted at an average rate of 9% of the primary samples. • Crush sizing analysis is conducted randomly by the Laboratory as part of their QC process. Pulp residues are expected to have 90% passing ≤75μm. This data is monitored by the Laboratory Supervisor. Grind times can be lengthened accordingly. • Current procedures dictate a process of validation and checking of laboratory results when data is returned by the laboratory as it is loaded into the independently managed Quest
catalystmetals.com.au
59
Criteria
•
Verification of sampling and assaying
• •
Location of data points
• • • •
Data spacing and distribution
• •
Orientation of data in relation to geological structure
• •
Commentary database. A standard set of plots and checks are undertaken, and if results fall outside of the expected limits, then re-assaying is requested. QAQC reports are generated by the database administrator and documented from automated routines out of the database. RC and diamond drilling data has been verified by the geologist first and then the Database Administrator before importing into the main Quest database (proprietary database system). RC and DD logging is completed electronically on laptops. Database protocols and rules are applied upon data entry. All drill data within site databases are regularly validated using both internal database systems and external validation tools. All drill collars were accurately surveyed by DGPS using the MGA94 Zone 50 coordinate system. Downhole survey data was collected using an Axis Mining Technology Champ North Seeking Gyro tool. Surveys are undertaken on 30m intervals as the tool is removed from the holes once the hole is completed. The diamond holes used NSGY tool with surveys collected on 5m intervals. Downhole surveys are visually inspected for anomalous changes in drill trace, (i.e does the drill hole deviate excessively). Resource Definition and Infill RC/DD drilling was completed on 25m to 50m spacings at the Central 400 and Main 200 zones to confirm controls on the mineralisation trends. Further extensional drilling on nominal 100 m spaced lines was completed on the Western, Eastern and Northern zones to test for extension to the mineralised zones and define the extents of the mineralised system. This drilling spacing is wide and considered exploratory in nature. The orientation of a majority of the drilling is approximately perpendicular to the strike and dip of the mineralisation and is unlikely to have introduced any sampling bias. Certain holes have drilled parallel to key structures, but density of drilling and drilling on other orientations has allowed detailed geological modelling of these structures and hence any sampling bias in a single hole has been removed.
Section 3 Estimation and Reporting of Mineral Resources Old Highway Deposit (Criteria listed in section 1, and where relevant in section 2, also apply to this section.) Criteria Commentary Database integrity
•
Site visits
•
ASX:CYL
The Catalyst drillhole database is managed by a third party consultant EarthSQL in the Quest Database system (a proprietary SQL server hosted database). • Old Highway drilling data has been exported to MS Access and audited before estimation. • Various validation checks in GEOVIA Surpac™ and Seequent Leapfrog Geo™ 3D software and data queries in MS Access were undertaken such as overlapping samples, duplicate entries, missing data, sample length exceeding hole length, unusual assay values and a review of below detection limit samples. A visual examination of the data was also completed to check for erroneous downhole surveys. • The data validation process identified no major drill hole data issues that would materially affect the MRE outcomes. • Database checks included the following: o Checking for duplicate drillhole names and duplicate coordinates in the collar table. o Checking for missing drillholes in the collar, survey, assay and geology tables based on drillhole names. o Checking for survey inconsistencies including dips and azimuths <0˚, dips >90˚, azimuths
360˚ and negative depth values. • The drillhole database used for resource estimation, dated 26 August 2026, was comprised of the following main table records: o Collar – 2,417 o Survey - 35,824 o Lithology - 5250 Assay – 152,607 The Competent Person undertakes frequent site visits to the Plutonic Gold Operation and associated tenements.
catalystmetals.com.au
60
Criteria
Commentary
Geological interpretation
•
•
•
•
• •
• •
•
Dimensions
•
• • Estimation and modelling techniques
• • • • • •
The Old Highway deposit occurs within the Padbury Basin and is located within the unit informally known as the Cow Hole Bore Member. The Cow Hole Bore Member consists of a thick sedimentary package composed of siltstones, lithic arenite/wackes, quartz arenite/wackes, and pebble conglomerates. Fining upward sequences are seen throughout the Cow Hole Bore Member within the Old Highway Prospect where sediments are fining to the north. Structural measurements completed on core samples indicate a consistent steep dip to the north-northwest (87° -> 346°). The Old Highway gold mineralisation is hosted within the northeast-southwest trending Old Highway Shear Zone (MGA grid). The Old Highway Shear Zone is characterised by a broad zone of tightly spaced shear fabric that transects the Cow Hole Bore Member sediments. This fabric occurs contemporaneously with and post an early sericite fabric that defines poorly developed layer parallel shear zones. Two stages of later chlorite shear fabrics transect the bedding. The first chlorite shear fabric occurs in association with the second phase of veining. The second chlorite fabric is potentially related to late brittle deformation Gold mineralisation is concentrated where the faults within the OH Shear Corridor cross-cut the coarse grained sediments (CG sediments). The CG sediments are likely to have provided a larger rheological contrast than the finer grained sediments and thus are key to the constraint of mineralisation. Mineralisation is characterised by quartz-carbonate veins ± pyrite ± selvages of disseminated pyrite ± selvages of sericite alteration. The vein zones are variable in extent and thickness. The increase in width towards the surface is interpreted to have developed during the evolution of the regolith profile. Modelling of the weathering profile was completed by Catalyst using Leapfrog implicit modelling based on the logging information. Mineralisation domains have been interpreted primarily using geological logging and downhole geological contacts, based on lithology, gold grade distribution, major fault location and geometry. A nominal cut-off grade of 0.2g/t Au, and a minimum downhole length of 2m was used to guide the geological continuity of the interpreted mineralisation lodes. Interpretation of the mineralisation has been undertaken in Seequent Leapfrog Geo™ software using all available drillholes. Intercepts correlating to gold mineralisation and underpinned by strike continuity have been independently identified and manually selected within Seequent Leapfrog Geo ™ prior to creation of implicit volume models. The geological model is comprised of a total of 30 estimation domains. Catalyst considers confidence is moderate to high in the geological interpretation and continuity of the mineralisation domains. The Old Highway (OH) Shear Corridor to which the OH gold mineralisation is associated has a strike length of approximately 3,300 m, an average width of 120 m, and extends for up to 500 m down dip to 50 mRL. The mineralised domains strike northeast–southwest and are steeply northwest dipping to sub-vertical. The narrower and less continuous Wilthorpe Zone lies 160m to the northwest of the OH Shear corridor and has a more limited strike length of about 600m. The MRE interpretation and estimation used a total of 39,472.8 m of drilling from 69 diamond and diamond tails, and 125 RC holes. Interpretations used all available drillhole data, but RAB and AC drilling data was excluded from the resource estimation. The domain intercepts have been imported into the MS Access database and prepared for compositing in Surpac. No deleterious elements have been estimated or assumed. Only gold grade has been estimated. The model has been validated by comparing statistics of the estimated blocks against the composited sample data, and visual examination of the block grades versus the assay data in section and swath plots.
CIK Methodology • •
ASX:CYL
All drillhole assay data has been composited to 1m downhole before use in the estimate. The moderate to high grade variability and lack of spatial continuity of high grades requires a non-linear approach to deal with the high grades during estimation. A traditional approach of
catalystmetals.com.au
61
Criteria
Commentary
• • •
•
•
•
•
• •
• •
ASX:CYL
physical domaining, assay cutting, and linear estimation (IDW or OK) is considered inadequate in dealing with this complexity. The estimation method combines Categorical Indicator Kriging (CIK) to define broad estimation domains, together with applying distance limiting at chosen grade thresholds to restrict the influence of the high-grade values during grade interpolation. Prior to estimation, a reference surface for each domain has been exported from Leapfrog. This is calculated as the best fit surface using the hanging wall and footwall surfaces. The reference surface has been imported into Surpac and a dip and dip-direction value of each triangle facets is imported into the Surpac block model to provide information for dynamic search and variogram model orientation during interpolation. Dynamic estimation has been applied for estimating the CIK indicators and gold grades. Two Categorical Indicator values have been determined: o A low-grade (LG) indicator was assigned to differentiate between background ‘waste’ and low-tenor mineralisation. o A high-grade (HG) indicator was assigned to define broad areas of consistent highertenor mineralisation. Variograms were generated for the LG, MG and HG indicators for the main Central domain 4010. The variogram and estimation parameters for this domain were then applied to all the other domains that comprise the Old Highway mineralised system. The CIK indicators have been estimated using Ordinary Kriging into a finely gridded block model with block dimensions of 1.25m x 1.25m x 1.25m. The small block size for the indicator process is beneficial for creating categorical sub-domains at a resolution which can be used to accurately back-flag composite data. Three categorical sub-domains have been generated: low-grade (LG), medium-grade (MG) and high-grade (HG) areas. The HG sub-domain has been based on an indicator probability threshold of 0.35 and the LG sub-domain has been based on an indicator probability threshold of 0.65. The MG sub-domain is assigned to blocks that do not satisfy either the HG or LG subdomain criteria. The three categorical block model sub-domains (HG, MG and LG) have been used to ‘back-flag’ the 1m composites, thus creating a separate composite file for each sub-domain. The assay top-cuts have been applied to the sub-domain composite files. The top-cuts are generally above the 99th percentile of the distribution and have been aimed at globally limiting extreme values only. In this estimation methodology, top-cuts are not used as the primary tool to control metal risk. The use of grade thresholds and distance limiting is considered a more objective and influential method in controlling metal risk, while better reflecting the actual localised occurrence of discontinuous high-grade gold mineralisation. Grade thresholds for distance limiting have been determined from log-probability plots and detailed review of the spatial locations of the gold grades. The indicator cut-offs, assay top cuts and grade distance limiting thresholds for each domain are summarised below:
catalystmetals.com.au
62
Criteria
Commentary Area
West
Main West
Main (250)
Central West
Central (400)
• • •
ASX:CYL
Domain
Categorical Indicator
1010 1010 1010 1020 1020 1020 1040 1040 1040 1050 1050 1050 1060 1060 1060 2005 2005 2005 2010 2010 2010 2020 2020 2020 2030 2030 2030 2060 2060 2060 2070 2070 2070 2080 2080 2080 2090 2090 2090 2510 2510 2510 2520 2520 2520 2530 2530 2530 2540 2540 2540 2550 2550 2550 2560 2560 2560 3010 3010 3010 3020 3020 3020 3030 3030 3030 3040 3040 3040 4010 4010 4010 4020 4020 4020 4030 4030 4030 4040 4040 4040 4050 4050 4050 4060 4060 4060 4070 4070 4070
LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG
Indicator Assay Top Cut-offs Cut (Au (Au g/t) g/t) 0.08 0.4 2.5 0.9 20 0.12 0.3 1.5 0.8 6 0.1 0.1 1.8 1.2 8 0.09 0.09 1 0.7 6 0.08 0.1 1.8 0.9 3 0.12 0.12 1.2 0.8 12 0.1 0.1 1.2 1.2 4 0.08 0.12 1.2 1 9 0.08 0.12 2.5 0.9 9 0.12 0.1 1.2 0.9 4 0.1 0.1 0.8 0.9 3 0.09 0.07 1.1 1.2 4.5 0.1 0.1 1 0.9 5 0.1 1 9 1.2 20 0.12 0.12 1.2 0.8 4.5 0.09 0.08 1 0.9 4.5 0.09 0.15 1.2 0.5 4 0.12 0.12 1.5 0.8 5 0.08 0.1 1.8 0.6 5 0.09 0.1 3 1 9 0.1 0.1 1.2 0.9 15 0.12 0.12 2 1 15 0.08 0.6 2 0.8 20 0.1 1.8 15 1 90 0.1 0.3 3 1 30 0.1 0.12 1.2 0.9 15 0.1 0.1 1 0.9 3 0.15 0.1 0.9 1.2 12 0.1 0.1 0.8 0.6 15 0.2 0.18 2 1.8 35
Grade Threshold (Au g/t) 0.08 0.9 4 0.12 0.8 3 0.09 1.2 6 0.08 0.6 4 0.07 0.8 2 0.1 0.8 10 0.09 0.9 3 0.08 0.8 7 0.08 0.9 4 0.08 0.8 3 0.08 0.7 2.5 0.06 0.9 3 0.09 0.7 4 0.2 1.5 9 0.1 0.8 2.5 0.07 0.8 3.5 0.08 0.5 3 0.1 0.7 3 0.04 1 3 0.07 1 5 0.08 0.8 5 0.1 1 7 0.1 0.9 7 0.2 1.8 30 0.12 1 12 0.1 0.8 8 0.06 0.8 2.5 0.5 0.8 7 0.07 0.6 8 0.15 1.2 20
Grade Limiting Distances (metres) 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15 15 20 15
Prior to grade estimation, sub-domain codes from the 1.25 m resolution block model have been imported into a Y=2.5m x X=2.5m x 2.5m resolution block model and the proportion of LG, MG and HG is calculated for each 2.5m x 2.5m x 2.5m block. The choice of a 2.5m x 2.5m x 2.5m block size reflects the likely mining selectivity achievable for an underground mining scenario. Grade estimation for the LG, MG and HG sub-domains has been undertaken in Surpac software using Ordinary Kriging (OK) with grade threshold distance limiting. Search routines and
catalystmetals.com.au
63
Criteria
Commentary
Moisture
variogram orientations are drawn from the pre-populated dynamic search information recorded in each block (dynamic anisotropy). • Final block grades at a 2.5m x 2.5m x 2.5m block resolution have been calculated by weighting the estimated grades for each sub-domain by the relevant domain proportion. The parent estimation block size is 2.5m x 2.5m x 2.5m. • A single-pass estimation strategy has been used across all domains, where a search radius of 120m and a minimum of 4 to a maximum of 12 composites has been utilised to estimate a grade. It is possible that up to 36 composites can be used to estimate a parent block where there is a proportion of all three sub-domains present. Octant restrictions have not been used. • Block sizes were selected based on drill spacing and the thickness of the mineralised veins. • No selective mining units were assumed in the resource estimate. Only Au grade was estimated. • All estimations were carried out on a ‘dry’ basis.
Cut-off parameters
• • •
Mining factors or assumptions
• • • • •
Metallurgical factors or assumptions
Environmental factors or assumptions
• •
• • • •
Bulk density
•
Classification
• •
• •
ASX:CYL
The Old Highway Underground Mineral Resources is reported at a cut-off grade of 1.5 g/t Au. The cut-off grade has been derived from current mining and processing costs and metallurgical parameters used for the operating K2 Underground mine and at the nearby Plutonic Underground Mine. Old Highway Open Pit Mineral Resources are reported at a cut-off grade of 0.5 g/t Au derived from recent mining and processing costs and metallurgical parameters used at the recently completed Trident West Open Pit. The Old Highway Underground Mineral Resources is reported to a maximum vertical depth of 500m below the topographic surface at a 1.5 g/t Au cut-off grade for fresh material only. Mining selectivity is assumed to include a minimum mining width of 1.5m, minimum stope length of 5m, and a minimum stope height of 5m. The Old Highway Open Pit Mineral Resource is reported at a 0.5 g/t Au cut-off grade for oxide and transitional material only. Mining selectivity is assumed to be on 2.5m vertical benches with a 5m x 5m Selective Mining Unit (SMU). It is assumed that underground and open pit mining is possible at the project if demonstrated to be economically viable to be trucked and processed at the Plutonic Gold Plant. No mining parameters or modifying factors have been applied to the Mineral Resource. It is assumed the ore will be trucked and processed at the Plutonic Gold Plant. Recovery factors are assigned based on laboratory test work and on mining factors derived from the current K2 Underground mine and the nearby recently completed Trident West Open Pit. No metallurgical assumptions have been built or applied to the resource model. The area is not known to be environmentally sensitive and there is no reason to think that proposals for development including the stockpiling of waste would not be approved. The small amount of waste rock would be stored in a traditional waste rock landform ‘waste dump’. Due to low sulphide content and the presence of carbonate alteration the potential for acid content is considered low. Density has been assigned to the resource models using interpreted weathering surfaces determined from drill hole logging. o Oxide =1.72 o Transitional=2.16 Fresh=2.79 Mineral Resources were classified as Indicated and Inferred to appropriately represent confidence and risk with respect to data quality, drillhole spacing, geological and grade continuity and mineralisation volumes. Additional considerations were the stage of project assessment, amount of DD and RC drilling undertaken, current understanding of mineralisation controls and mining selectivity within the mining environment. The drilling, surveying and sampling undertaken, and analytical methods and quality controls used, are appropriate for the style of deposit under consideration. Factors considered when classifying the model include: o The portions of the Old Highway MRE classified as Indicated have been flagged in areas of the block model where the average distance to the nearest informing composited drill intercept was nominally 30m or closer. o The portions of the MRE classified as Inferred typically represent minor lodes or lower grade portions of the larger domains where geological continuity is present but not
catalystmetals.com.au
64
Criteria
Audits or reviews
Discussion of relative accuracy/ confidence
Commentary consistently confirmed by 30m spaced composited drill data. The extrapolation of the resource was limited to a maximum of 80m past the last sample point. • Further considerations of resource classification include; data type and quality (drilling type, drilling orientations, down hole surveys, sampling and assaying methods); geological mapping and understanding. • The Mineral Resource estimate appropriately reflects the view of the Competent Person. • The geological interpretation, estimation parameters and validation of the resource model was peer reviewed by Catalyst staff. • No external reviews of the resource estimate had been carried out at the time of writing. • The relative accuracy of the Mineral Resource estimate is reflected in the reporting of the Mineral Resource as per the guidelines of the 2012 JORC Code. • The statement relates to the global estimates of tonnes and grade.
Section 4 Estimation and Reporting of Ore Reserves Old Highway Deposit (Criteria listed in section 1, and where relevant in sections 2 and 3, also apply to this section.) Criteria Mineral Resource estimate for conversion to Ore Reserves
Commentary • The Mineral Resource Estimate (MRE) used for the Old Highway open pit and underground Ore Reserve is described in Section 3. •
Only the Indicated portion of the Mineral Resources are reported, and they are inclusive of the Ore Reserve. The Ore Reserves are a subset of the MRE and are spatially contained within the MRE.
Site visits
•
The Competent person is a full-time employee of Catalyst Metals and has conducted regular visits to the Plutonic Mine Site and Old Highway the proposed processing and mining locations. The competent person has no concerns arising from these visits that would impact the Ore Reserve viability
• Study status
•
• • •
Cut-off parameters
• •
•
Mining factors or assumptions
ASX:CYL
The open pit Ore Reserve has been generated from a Pre-Feasibility level assessment, appropriate for the size and scale of proposed operations. The study has both internal Catalyst personnel and external consultants provide inputs into the mine plan with appropriate geotechnical, hydrological, equipment, metallurgical and mining method information. Mining costs have been derived from recent open pit Western Australian contractor quotations. All other costs are based on recent actual Catalyst costs and recent vendor quotations. The underground Ore Reserve has been generated from a Pre-Feasibility level assessment, appropriate for the size and scale of proposed operations. Underground mining costs have been derived from recent actual Catalyst underground costs, in addition to recent vendor quotations. Modifying factors accurate to the study level have been applied. The resulting mine plans for both the open pit and underground are technically achievable and economically viable. Economic cut-off grades have been applied in estimating the Ore Reserve. An open pit cut-off grade of 0.6 g/t has been applied which accounts for all mining, processing, surface haulage and administrative costs utilising a A$4,500 gold price. All royalties and metallurgical factors are also applied in the cut-off grade calculations. An underground cut-off grade of 2.5 g/t has been applied. Incremental stopes are taken at a 1.5 g/t cut-off grade where development is already in place. A development cut-off grade of 1.0 g/t was applied. Underground cut-off grades account for all mining, processing, surface haulage and administrative costs utilising a A$4,500 gold price. All royalties and metallurgical factors are also applied in the cut-off grade calculations.
Mining method • The proposed open pit mining method is a conventional truck/shovel fleet comprised of 200t and 120t excavators and 60t and 90t haul trucks. • The proposed underground mining method is longhole stoping. The majority of stopes are backfilled with cemented rockfill or loose rock fill, and a smaller subset are open stopes with pillars. Underground mining is proposed with mechanical methods utilising
catalystmetals.com.au
65
Criteria
Commentary similar mining fleet to what is currently used at the Plutonic underground and owneroperator management. The mining fleet will consist of twin boom jumbo’s, 17 tonne loaders and 60t trucking fleet. • The competent person considers these mining methods appropriate for the Old Highway deposit. Geotechnical and Geological • A Pre-Feasibility study was conducted on the Old Highway Open pit and underground deposits with geotechnical parameters for the open pit provided by Absolute Geotechnics and underground parameters provided by Turning Mining and Geotechnical. These parameters and their final application were reviewed by the Catalyst Metals geotechnical department, and applied by Catalyst Metals in optimisation and final mine designs. • Recommended geotechnical parameters were followed in open pit and underground mine designs including for slope designs in various weathering profiles, stope sizes, dilution and recovery parameters, ground support, portal, and backfill recommendations • Grade control drilling costs and scheduling have been allowed for in both open pit and underground evaluation. Pit optimisation and design • Open pit optimisations were completed in Whittle mining software. Pit optimisations were completed at a A$4,500/oz gold price and exclude inferred and unclassified resources. • From the open pit optimisation, a pit design, mining schedule and financial assessment were completed confirming technical achievability and economic viability. Open Pit mining ore loss and dilution • In the open pit Ore Reserve representative dig blocks were generated to determine appropriate dilution and ore loss factors. • Dilution factors of 17% in oxide, 19% in transitional and 21% in fresh material have been applied. • A mining recovery factor of 93%, or stated as a 7% ore loss allowance, has been applied. Underground stope optimisation and design • Underground stope shapes were generated using Deswik Stope Optimiser, using a 3.5 m minimum mining width with 0.5m of dilution on both footwall and hanging wall at resource model grade. A total of 1.0 m of dilution at resource model grade has been applied. • Stope strike lengths of 15m with floor-to-floor level spacing of 20 m were applied • From the stope shapes generated, a mine design, schedule and financial evaluation were completed confirming technical achievability and economic viability. Underground mining ore loss and dilution • 0.5m of dilution on both footwall and hanging wall (total of 1.0m) were applied to all stope shapes. • A mining recovery factor of 95% has been applied to backfilled stopes to account for bogging losses, with a 75% mining recovery factor applied to open stopes to account for in-situ pillars and bogging losses. • Development has no dilution and 100% mining recovery applied. Consideration of Inferred Mineral Resource • Any Inferred or Unclassified Mineral Resources captured within the open pit and underground mine plan have been assigned a zero-grade value and the material treated as waste. Infrastructure Requirements • Infrastructure requirements have been considered for open pit mining and underground mining operations. These include establishment costs associated with site setup at Old Highway, where there is no existing infrastructure. This includes infrastructure considerations for access roads, power, water, offices and ablutions,
ASX:CYL
catalystmetals.com.au
66
Criteria
Commentary workshops, safety facilities, stores, communications, lighting and ancillary, magazines, dewatering infrastructure, waste dumps, and run-of-mine pads (ROM pads). • Processing, messing, accommodation, and airstrip infrastructure is in place at the Plutonic Mine Site.
Metallurgical factors or assumptions
•
• • •
• •
• •
Environmental
Infrastructure
Costs
Historical environmental baseline surveys, test work and studies have been completed on the Old Highway deposit. Catalyst will be progressing with mining approvals and permits as the project advances and sees no impediments to granting of these approvals and permits. • Processing plant and tailings storage facilities are located at Plutonic and will be utilised for the processing of Old Highway ore and deposition of resulting tailings. • Development of Old Highway will require pre-production capital for the development of: haul roads site clearing establishment and dis-establishment of all facilities including workshop, offices and ablutions, fuel storage, explosives magazine, power, water, sundries mobilisation and demobilisation • Capital estimates for these site works were provided by a contractor and have been considered in the Old Highway economic assessment. • Labour will be sourced primarily on a fly-in fly-out basis, via the Plutonic mine site accommodation, and air strip facilities. • Power will be provided via diesel generators. • •
•
• • • Revenue factors
ASX:CYL
Metallurgical test work to a Pre-Feasibility level of study has been completed on the Old Highway mineralisation by Independent Metallurgical Operations (IMO) consultancy as well as additional internal metallurgical analysis. A Comprehensive suite of leach and gravity test work has been undertaken on the Old Highway deposit. A series of 23 variable composites were sampled which represent various lithological and weathering profiles throughout the orebody. IMO’s proposed metallurgical process consists of a crushing, grinding, gravity, and leaching and adsorption circuit is similar to that employed at the Plutonic processing facility where Old Highway material is intended to be processed IMO’s test work resulted in Catalyst applying a 94% metallurgical recovery for open pits and 88% for underground fresh material. The Ore Reserve will be treated at the established Plutonic processing facility. The facility is a conventional crushing, gravity circuit, grind, and CIL (carbon in leach) plant and is appropriate for the extraction of gold from the Old Highway mineralisation. This is well-tested technology that is currently used in processing material at the Plutonic Mine Site. Concentrations of deleterious elements have been noted as very low across different ore types including fresh, transitional and weathered ore and not anticipated to be problematic.
•
Underlying capital and operating costs assumptions are to a Pre-Feasibility level. Open pit mining and capital costs are derived from a Request for Quotation (RFQ) process, which reflect recent open pit Western Australian contractor costs and ancillaries. Some capital costs are also sourced from recent vendor quotations. Underground mining operating and capital costs are based on recent actual costs from Plutonic Mine site underground operations which employ similar mining methods and equipment fleet in addition to recent vendor quotations. Processing and general and administrative costs, salaries, and accommodation costs are based on recent actuals from the Plutonic mining operation. Allowances have been made for State royalties (2.5%) payable on net revenue plus a 0.5% third party royalty. Surface haulage rates have been applied based on recent contractor quotations. The open pit and underground Ore Reserve has been assessed at a gold sale price of A$4,500/oz.
catalystmetals.com.au
67
Criteria
Commentary • The competent person considers the gold price to be appropriate given the current gold spot price and the level of study.
Market assessment
• •
Economic
•
•
Social
•
•
Other
• • •
Classification
Gold metal is a freely and widely traded commodity with a transparent mechanism for setting prices and for sale of gold produced. Catalyst has not conducted any studies or analyses such as commodity price projections, product valuations, market entry strategies, or product specification requirements The Old Highway operation demonstrates a positive Net Present Value (NPV) based on the stated cost parameters, revenue assumptions, and a discount rate of 7%, consistent with the assumptions used for Ore Reserve estimation. The NPV is most sensitive to changes in gold price. However, with the current spot price materially higher than the Ore Reserve price (A$4,500/oz), short-term variability in the gold price is not expected to have a material impact on the Ore Reserve estimate. Catalyst has, and will continue, to engage with key stakeholders. This includes traditional landowners, local shire governments and the various pastoral stations surrounding our tenements. There are no immediate concerns that would suggest any impact to the Ore Reserve statement on this basis. Catalyst continues to engage with local personnel in providing employment opportunities. Contracts are in place at Plutonic for critical supplies. Old Highway is expected to leverage off Plutonic’s supply chain and procurement. No other matters, other than disclosed in this Table 1 are considered material to the estimation and reporting of this Ore Reserve. Granted mining leases cover all the proposed mining and processing assets.
•
The Ore Reserves classification reflects the Competent Person’s view of the deposit. Only Probable reserves have been declared and are based on Indicated Resources following consideration of modifying factors. No Probable Ore Reserves are derived from Measured Resources.
Audits or reviews
•
This Ore Reserve estimate has not been reviewed by an external third party.
Discussion of relative accuracy/ confidence
•
The accuracy of the Ore Reserve estimate is largely dependent on the geological estimate, and so reflects the confidence in the Mineral Resource. The Ore Reserve has been completed to a Pre-Feasibility study level of assessment. The Ore Reserve is a global estimate. Modifying factors including dilution and recovery, mining and processing recoveries, geotechnical parameters and cost inputs and resulting application are appropriate for the level of study. As the supporting work is done to a Pre-Feasibility study level, further geological, geotechnical, and metallurgical work is planned prior to execution.
• •
• • •
•
ASX:CYL
catalystmetals.com.au
68
APPENDIX 5 PLUTONIC EAST – JORC CODE, 2012 EDITION – TABLE 1 Section 1 Sampling Techniques and Data Plutonic East (Criteria in this section apply to all succeeding sections.) Criteria
Commentary
Sampling techniques
•
This release relates to the Mineral Resource Estimate (MRE) update for the Plutonic East Underground deposit. Catalyst commenced underground re-development activities in April 2024 and produced first stoping ore in March 2025. The Plutonic deposit has been sampled using numerous drilling and sampling techniques by Billabong Gold Pty Ltd (Billabong - 100% owned Catalyst Metals Limited) and previous operators. Drilling and sampling techniques by previous operators is assumed to be to industry standard at that time. All drilling data completed by Catalyst since the previous MRE (data cut-off date of 6 June 2024) to the current data cut-off date of 28 July 2026 has been incorporated. Underground sampling data comprised 997 diamond holes (71,512 m), 18 sludge holes (137 m), and 4,500 m of face samples which form the basis of this Mineral Resource update. Additional surface drilling comprised of 2 Diamond Core and 88 Reverse Circulation holes for a total of 14,035 drill metres. o Diamond Drilling (DD) A significant portion of the data used in resource estimations has been gathered from diamond core. The majority of diamond core was NQ2, but multiple core sizes have been used historically. The core is geologically logged and subsequently halved for sampling. All samples honour geological boundaries (lithology, mineral assemblage, alteration etc) defined by logging. o Face Channel Sampling (FS) FS samples are completed by the mine geologists. Each development face / round is chip sampled perpendicular to the mineralisation. The sampling intervals are domained by geological constraints (e.g. rock type, veining and alteration / sulphidation etc.). The majority of exposures within the orebody are sampled. o Sludge Drilling (SL) Sludge drilling is performed with an underground production drill rig. It is an open hole drilling method using water as the flushing medium, with a 45mm or 102mm hole diameter. Nominal sample lengths of 0.9m and 1m are used depending on whether a Jumbo or Longhole configuration is used. A 3-5kg sample is captured using the ‘sludge cone’ (aluminium cylindrical cone purchased from WESTERNEX). o RC Drilling (RC) RC samples were collected for each metre drilled and passed through a cyclone and cone splitter to produce a 2-7 kg assay into calico bags. Samples are generally dry. The residual material is retained on the ground near the hole. Some of the holes have been sampled using 3m composited samples through the overlying cover rock.
•
• •
Drill Type Surface DD Surface RC UG DD FS Sludge drilling Total
Holes
Drill Metres 2 88 997 952 18 2,057
420 14,035 71,512 4,500 137 90,605
• Drilling techniques
• • • • •
ASX:CYL
RC drilling used a nominal 5.75 inch diameter face sampling bit. Surface and Underground DD is exclusively NQ core with a diameter of 47.6 mm. Historical diamond core drilling consisted of BQ (36.4 mm), BTW (42 mm), LTK60 (43.9 mm), NQ (47.6 mm), NQ2 (50.7 mm). Sludge drilling is an open hole drilling method using water as the flushing medium, with a 45mm or 102mm hole diameter. Probe hole lengths range from 4.6m to 13.7m depending on whether a Jumbo or Longhole configuration is used. All competent DD core is orientated using a Reflex ACT device and detailed structural measurements and logging is carried out.
catalystmetals.com.au
69
Criteria Drill sample recovery
Logging
Sub-sampling techniques and sample preparation
Commentary • All holes have been logged on site by an experienced geologist. • The core is jig-sawed back together and metre marked carefully. Discrepancies to core blocks are resolved with the drill contractor. Core loss blocks are inserted as required. • Core recovery for the diamond drilling is based on the measured core returned for each 3m run. • Catalyst diamond drilling practice results in high core recovery due to the competent nature of the ground, with an average recovery of 99% through the mineralised zones. • RC drilling has been bagged on 1m intervals and an estimate of sample recovery made on the size of each sample. • Sludge holes are drilled at a sufficient angle (>25 deg) to ensure adequate hole flushing and chip drainage to minimise effects of sample smearing between metre intervals. • There is no known relationship between sample recovery and grade at Plutonic East. • All RC pre-collars have been logged on 1m intervals. • DD samples have been logged by qualified geologists to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. • Logging is both qualitative and quantitative. 100% of drill core is logged. • Logging records include: depth from, depth to, lithology, texture, colour, alteration style, alteration intensity, alteration mineralogy, sulphide (percentage and type), quartz (percentage), veining, and general comments. • Orientated core structural measurements have been taken at relevant structures and where the foliation is relatively consistent. • All drill core is photographed both wet and dry. All photos are stored on the Company’s servers, with the photographs from each hole contained within separate folders. Development faces are mapped geologically. • All underground NQ grade control holes (47.6mm diameter) were whole-cored sampled to streamline the core handling process. Sample lengths ranged from 0.3m to 1m. • Sludge drilling used nominal sample lengths of 0.9m and 1m depending on whether a Jumbo or Longhole configuration is used. A 3-5kg sample is captured using the ‘sludge cone’ (aluminium cylindrical cone purchased from WESTERNEX). • Face channel samples were nominally chipped across the face from left to right, sub-set via geological features as appropriate. Sample lengths ranged from 0.2m to 1.5m • All underground grade control samples (DD, FS & SL) were dispatched to the Plutonic site laboratory for analysis using PAL method (PAL_DIBK) • All RC samples were dispatched to the ALS and ITK laboratories in Perth for gold fire assay analysis (Au-AA26 & Au-FA25 or Au-FA50). • Surface DD core was half-cut and sampled on 1m intervals or to geological contacts, with sample lengths varying between 0.2m to 1.6m. Whole core sampling was instigated for broken/sheared zones which could not be cut. This resolved any possible biasing issues with 1/2 core grab samples within incompetent fractured and sheared zones. • DD core samples were sent to several labs: the majority to Plutonic onsite lab (PAL_DIBK), and the remainder to BV (Au-FA50-AAS) and ALS (Au-AA26). Sample preparation procedures for the Plutonic onsite lab by PAL method (PAL_DIBK) includes: o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o A nominal 500g riffle split sample is used for PAL assaying for 1 hour leach cycle o PAL 1000 Grind Check: A minimum of 95% passing 75 μm sieve size. o Sample re-assay or duplicate samples are taken from the retained original crushed sample Sample preparation procedures at ALS laboratory includes: o Sample sorting and drying (DRY-21). o Core sample is coarse crushed (CRU-21), RC samples not crushed. o Pulverise entire sample to a particle size of 85% passing 75µm (PUL-24). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (Au-AA26). Sample preparation procedures at BV laboratory includes: o Sample sorting and drying (PR001). o Entire core sample is crushed to 10mm (PR102), RC samples not crushed. o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 90% passing 75µm (PR303). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (FA50). Sample preparation procedures at ITK laboratory includes: o Sample sorting and drying at 105°C. o Entire sample is crushed to a nominal 90% passing 2mm (SPO3)
ASX:CYL
catalystmetals.com.au
70
Criteria
Commentary o Riffle splitting to obtain between 1.5 to 3kg. o Pulverising to a particle size of 90% passing 75µm (SPO3). o 200g sample aliquot for lead collection by Fire Assay 25g and 50g charges with ICP-OES finish (FA25/OE02 and FA50/OE02). Sample preparation protocols and sample sizes are considered appropriate for the style of mineralisation encountered and should provide representative results. ALS BV ITK Plutonic Au-AA26 AU-FA50_AAS Au_FA Au_PAL_DIBK RC Samples 4,325 4,724 Face Samples (FS) 4,837 Sludge Samples (SL) 140 Diamond Core (DD) 2,617 4,631 79,251 Total 6,942 4,631 4,724 84,228 Sample Type
Quality of assay data and laboratory tests
• • • • •
•
• • •
•
•
Verification of sampling and assaying
• • • •
Location of data points
Data spacing and distribution
ASX:CYL
• • • • • • • •
Total 9,049 4,837 140 86,499 100,525
Fire assay gold analysis is considered to be total gold analysis. Samples analysed at Plutonic onsite lab used the PAL method (PAL_DIBK). The Pulverising and Leach (PAL) method is not considered to be a total gold analysis, however the larger sample size still produces a representative result. Samples were dried, crushed and pulverised prior to analysis. Certified Reference Material (CRM) were submitted at an average rate of 3% of the total number of samples in RC, SL & DD submissions. Face sample submissions combine all channels collected on a given shift whether from Plutonic or Plutonic East. Face sampling restarted at Plutonic East on the 19/01/2025; the total number of checks samples was calculated for all FS submissions received between 19/01/2025 to 27/07/2026. CRMs are of similar grade tenor to those grades that characterise the deposit. The CRMs were selected based on their grade range and mineralogical properties with an emphasis on sulphide ores. Coarse 40mm blanks were inserted at an average rate of 3% of the total number of samples. RC field duplicates were inserted at an average rate of 3% of the total number of samples. Crush sizing analysis is conducted randomly by the commercial laboratories as part of their QC process. Pulp residues are expected to have 90% passing ≤75μm. This data is monitored by the Laboratory Supervisor. Grind times can be lengthened accordingly. Catalyst samples have been stored on site and delivered to the ALS, BV and ITK assay laboratories in Perth by a Contracted Transport Company. Consignment notes have been used to track the samples. Operator sample security is assumed to be consistent and adequate. Current procedures dictate a process of validation and checking of laboratory results when data is returned by the laboratory as it is loaded into the acQuire database. A standard set of plots and checks are undertaken, and if results fall outside of the expected limits, then re-assaying is requested. Monthly QAQC reports are generated by the database administrator and documented from automated routines out of the database. DD, RC and face logging is completed electronically on laptops. Database protocols and rules are applied upon data entry. Visual validation and check logging of face and drill data. Drill and face sample data is stored in an AcQuire database. All maintained full-time by the Database Administrator. All face and drill data within site database are regularly validated using both internal database systems and external validation tools. There is no requirement for twinned holes in a production setting. The Plutonic East deposit uses the Plutonic local grid system (POL). Surface and UG hole collar locations are picked up regularly by site surveyors with DGPS. Multi-shot cameras are used for down-hole survey. Development faces are spatially located using Vulcan 3D software. Underground development voids are picked up regularly by site surveyors. Stopes voids are generally all surveyed by CMS (where practical and safe to do so). Plutonic East underground Mineral Resources are primarily based on DD, RC FS and SL data. Grade control DD spacing typically required for stope definition is between 8m × 8m to 10m ×10m. Close spaced FS are also used for stope definition.
catalystmetals.com.au
71
Criteria
Commentary • The data spacing and distribution is sufficient to establish geological and/or grade continuity appropriate for the Mineral Resource and classifications to be applied, with known likelihood of local variability. • The drill core is logged and divided into sample intervals that have a minimum sample length of 0.3m and a maximum sample length of 1.0m. Intervals should honour geological boundaries such as faults and lithological contacts. Most nominal sample lengths were at 1m intervals; sample compositing is not applied until the estimation stage. • Sample data was composited to 1 m and then used for estimation. • Drilling is orientated as close to perpendicular to mineralisation where possible. However, orientation to lode may be compromised by access to suitable drill platforms. Drillholes are extended to Mine Mafic boundary where required and practicable. • Underground DD and sludge holes were drilled as ‘fans’ from suitable drill platforms and intersect the lodes at variable orientations. • Face sampling is orientated perpendicular to lode orientation. • The variable drill orientation relative to mineralisation is not thought to make a material difference in the resource estimation. • The chain of custody is managed by Catalyst employees and contractors. • Once a hole has been logged, the sample intervals are generated directly into the AcQuire database. • Any unsampled drill core is kept in an unfenced core farm adjacent to the core cutting and processing shed. This is not regarded as a security risk due to the remote location of the mine with no community development near the mine. All core is photographed and records kept electronically • Geologists are responsible for marking the sample intervals and placement of Blanks and CRMs within the sampling stream for core. The Project Geologist and Senior Geologist complete quality control checks on the face data daily. • Field Staff are primarily responsible for the cutting and sampling of core. They also insert blanks and CRM and generate the sample numbers for core submissions. They are responsible for the transportation of the samples to the laboratory. • Face samples are delivered to the laboratory at the end of shift by the mine geologist together with the blanks and CRMs. • Upon receiving the digital file for the reported assay data by the laboratory, the Database Administrator (DBA) imports the file into the master AcQuire database. This data is not accessible for assessment until it has been validated as complete and correct by the QAQC Geologist and DBA. • Pulp rejects from assayed samples are kept in wooden boxes on top of the waste dump. • Drill logs are kept electronically and are available for checking and due diligence. • CRMs, blanks and duplicates are reviewed continuously and indicate that sampling and analysis has been completed appropriately with no significant issues discovered. • No external audit or reviews of sampling techniques have been recently undertaken however the data is managed by company geologist who has internal checks/protocols in place for all QA/QC.
Orientation of data in relation to geological structure
Sample security
Audits or reviews
Section 2 Reporting of Exploration Results Plutonic East (Criteria listed in the preceding section also apply to this section.) Criteria Mineral tenement and land tenure status
Commentary • •
• •
Exploration done by other parties
ASX:CYL
• • • •
The Plutonic Gold Mine group includes 30 granted exploration and mining tenements (24 mining leases, 2 exploration licences, and 4 prospecting licences) (as such term is defined in the (Western Australian) Mining Act 1978 (the "Mining Act")) All rents to Department of Mines, Industry Regulation and Safety (“DMIRS”) have been paid and made within one month after the anniversary commencement date of the tenement as allowed under the Mining Act. All tenement Shire rates have either been paid or will be paid within the required timeframes. All compliance reporting including Form 5 Reports, have been lodged within the timeframes allowed under the Mining Act 1978 as amended. All Geological Reports have been lodged. There are no other unexpected encumbrances registered or recorded against the tenements. There are no Forfeiture proceedings against any tenements. 1969-1976 – International Nickel Company (Inco) conducted nickel exploration using geochemistry, geophysics, costeaning, RAB and RC drilling.
catalystmetals.com.au
72
Criteria • •
•
• • •
•
•
•
•
• •
Geology
•
•
Drill hole Information Data aggregation methods Relationship between mineralisation widths and intercept lengths Diagrams
ASX:CYL
• • • •
•
Commentary 1987 – Great Central Mines (GCM) identified an arsenic and gold anomaly by geochemical sampling in the Plutonic tenements. 1987-1993 – Battle Mountain Australia (BMA) undertook regional mapping, Bulk Leach Extractable Gold (BLEG) soil sampling, and RAB drilling. The Triple P, Pelican, Albatross and Flamingo deposits were discovered in 1992. Further RAB, AC, RC and DD programs were conducted to define these deposits. 1988-1994 - Resolute Resources Ltd (75%) and Titan Resources NL (25%) commenced exploration on the Marymia tenements. Gold mineralisation was discovered in the Keillor Shear Zone following regional exploration soil, stream sediment and rock chip sampling and geological mapping. Several phases of follow-up RAB, AC, RC and DD drilling was carried out. K1 deposit was discovered in 1989. Prospect scale geophysical surveys including magnetics and gradient array IP were undertaken between 1989 and 1994. 1990 – GCM carried follow up grid-based mapping, soil and lag geochemical surveys which led to the discovery of the Plutonic deposit. 1990 – GCM discovered satellite deposits at Area4 and Channel. Both were mined by open pit between 1999 and 2001. 1990-1995 – Plutonic Resources exploration division carried out exploration on the Freshwater tenements and discovered a total of 1 underground and 30 surface prospects. Follow up resource definition drilling resulted in conversion of these prospects to 10 open pits and one underground mine, including Area 4 open pit, Plutonic East underground deposit, Salmon, Trout and Perch. 1999-2004 - Homestake Gold of Australia undertook a detailed aeromagnetic and radiometric survey over the entire lease area. Additional IP and moving loop geophysical surveys were undertaken between 2000 and 2004 across several prospects. The largest of which was across the K1-K2 project area in 2004. 2004 - the Plutonic Development department undertook a large soil sampling programme over the northwestern end of the Marymia tenements, in conjunction with the IP survey. These surveys identified a number of targets that were followed up with some additional surface geochemical sampling. 2001-2007 - exploration and resource definition drilling by RAB, RC and diamond core drilling was undertaken by the Plutonic Development department across numerous prospects outside of the Plutonic Mine area. Many of these drilled prospects were proven up to become small satellite open pit mines such as Triple P B-Zone, Albatross, Flamingo, Kookaburra, Ibis, Piranha, to name a few. 2009-2012 - RC and diamond core drilling concentrated on extensions to the known Plutonic deposit. Outside of this area two 2D seismic lines were shot in conjunction with Curtin University and diamond core drill was undertaken at Plutonic West and Cod prospects. Plutonic East underground production ceased in 2012. 2012-2016 – under Northern Star Resources (NSR) surface exploration drilling was undertaken at prospect Big Fish located on the Eastern side of Plutonic East. A handful of underground diamond drill programs occurred to chase up-dip and down-dip extensions of known mineralisation. 2016 – 2023 Billabong Gold/Superior Gold took over from NSR and continued Big Fish surface drilling program. In 2019 a geotech program was undertaken on the Area4 open pit western edge from surface. The gold deposits at Plutonic & Plutonic East are hosted by an Archaean greenstone sequence and occur mainly as a multiple lode system with variable dip (horizontal to vertical) hosted almost exclusively by a mafic amphibolite sequence that is referred to as the ‘Mine Mafic’. Mineralisation regularly occurs as shallowly dipping, layer parallel lodes, although steep lodes and minor quartz-vein hosted deposits also occur. Mineralisation at Plutonic is characterized by a series of moderately-dipping to very flat-lying, stacked replacement-style lodes, individually up to five metres wide, that are hosted within ductile shear zones, oriented slightly oblique to stratigraphy. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately.
As all available drill hole information has been incorporated into the Mineral Resource, the drill
catalystmetals.com.au
73
Criteria Balanced reporting Other substantive exploration data Further work
Commentary intercepts have not been reported separately. • • •
As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. Grade control and extensional drilling programs are underway and will continue in line with mine development and production requirements.
Section 3 Estimation and Reporting of Mineral Resources Plutonic East (Criteria listed in section 1, and where relevant in section 2, also apply to this section.) Criteria
Commentary
Database integrity
•
•
•
• •
•
Site visits Geological interpretation
• • •
•
•
• • • •
ASX:CYL
The Plutonic East MRE database is regularly validated by Catalyst staff using data validation modules of Vulcan, Leapfrog and AcQuire software programs to identify any inconsistencies or logical errors in the data. Mine staff also visually check the drill hole data on-screen on a regular basis. Surface and underground drill hole and face data is validated to produce a digital database free of detected errors. This is undertaken by passing data through embedded macros and queries of the drill hole database software by table (collar, assay, lithology, survey, and grout). Crosschecks are also undertaken to ensure that each drill hole has data from collar, assays, lithology, survey, and grout files. By undertaking the above procedures, all drill hole and face data is rigorously checked, verified, and corrected where necessary to ensure limited failures. Surface and underground drill hole and face data is validated to produce a digital database free of detected errors. This is undertaken by passing data through embedded macros and queries of the drill hole database software by table (collar, assay, lithology, survey, and grout). Crosschecks are also undertaken to ensure that each drill hole has data from collar, assays, lithology, survey, and grout files. By undertaking the above procedures, all drill hole and face data is rigorously checked, verified, and corrected where necessary to ensure limited failures. The Plutonic East database as of 28/07/2026 is bounded by an area of >=7600 and <=15200 East and >=9000 and <=15000 North and is comprised of the following main table records o 19,184 Collar records, o 62,488 Survey records, o 680,261 Assay records, and 568,846 Lithology records. The Competent Person undertakes frequent site visits to the Plutonic Gold Operation and associated Marymia tenements. Review of assay data, stope geometry and its relationship to lithostratigraphic geometry was used to develop a conceptual model for Plutonic East in which Au mineralisation was related to two structural elements that developed during one progressive deformation event (D1). The earlier mineralised structures are flexural-slip shear zones developed in zones of competency contrast between mafic and sedimentary units within the Mine Mafic (‘MMA’) unit. These flexural slip zones developed in response to F1 folding producing an anticline-syncline pair that, subsequent to two later folding events, exhibit fold axes that plunge at gentle angles to the NW or SE. The folds are open in geometry and have axial planes that dip at steep angles to the NE, consistent with vergence to the SW. The flexural slip shear zones have dips that range from sub-horizontal to <25°, sub-parallel to primary layering. The later mineralised structures are restricted to the NE limb of the F1 anticline and have steeper dips that range from 25 - 45°. The most robust zones of Au mineralisation (both in terms of width and tenor) occur where the ramp structures intersect flexural slip structures. These intersection zones have been the focus of previous long-hole stoping at Plutonic East. The confidence in the geological interpretation is high with all the information and over 30 years of open pit and underground operation used in the generation of the models. All available geological data was used in the interpretation, including drilling face sampling and mapping. The modelling approach takes advantage of numerous structural measurements from orientated diamond holes and underground development faces to build structural trend surfaces and uses these trend surfaces to determine the mineralisation trend in domaining and grade estimation.
catalystmetals.com.au
74
Criteria
Dimensions
Estimation and modelling techniques
Commentary o Plutonic style mineralisation is characterised by a significant population of high to extreme gold grades that demonstrate very poor spatial continuity (only a few metres at best). These high-grade populations tend to occur in ‘clusters’ or cohesive zones on a large scale, however, the actual spatial continuity is very poor at a local scale, making it difficult to define robust zones of continuity without introducing significant bias. • Mineralisation extends over a strike length (East – West) of approximately 1400 m and downdip up to 600 m. Mineralisation currently extends to a depth of approximately 400 m below surface. •
•
•
• • • •
Gold mineralisation at Plutonic East exhibits very similar style and spatial behaviour to that observed at the Plutonic mine located approximately 4km to the west. Indeed, the bulk of Plutonic East mineralisation is hosted in the same Mine Mafic (MMA) unit that hosts almost the entire Plutonic deposit. More than 90% of the economic gold mineralisation at Plutonic East is hosted within the Mine Mafic Unit (MMA). Plutonic East mineralisation is characterised by a significant population of high to extreme gold grades that demonstrate very poor spatial continuity (only a few meters at best). Raw Coefficients of Variation (CoV) are typically in the order of 8 to 27, indicating extreme statistical variability. The estimation approach adopted for Plutonic East was identical to that used for the November 2023 and August 2025 Plutonic Main MREs. Four primary domains were separately estimated for Plutonic East: o Mine Mafic Unit (MMA-1000) o Upper Ultramafic Unit (UM1 – 2000) o Lower Ultramafic Unit (UM2 – 3000) o Overthrust Mafic Unit (OTM – 4000) Given the similarities to the nearby Plutonic mine, most of the estimation parameters were applied as the average of parameters used for the November 2023 Plutonic MRE. No deleterious elements have been estimated or assumed. Only gold grade has been estimated. The model has been validated by comparing statistics of the estimated blocks against the composited sample data, and visual examination of the block grades versus the assay data in section and swath plots.
CIK Methodology • All drillhole assay data has been composited to 1m downhole using the best fit algorithm in Surpac. • The moderate to high grade variability and lack of spatial continuity of high grades requires a nonlinear approach to deal with the high grades during estimation. A traditional approach of physical domaining, assay cutting, and linear estimation (IDW or OK) is considered inadequate in dealing with this complexity. •
• •
• •
The estimation method developed for the MRE combines Categorical Indicator Kriging (CIK) to define broad estimation domains, together with applying distance limiting at chosen grade thresholds to restrict the influence of the high grade and extreme grade values during grade interpolation. Prior to estimation, a closely spaced set of structural surfaces are developed in LeapFrog reflecting the primary controls on mineralisation within the primary lithological units. A dip and dip-direction of each triangle facets is imported into the Surpac block model to provide information for dynamic search and variogram model orientation during grade interpolation. Dynamic estimation is applied for estimating the CIK indicators and gold grades. All DD, RC, SL and FS data are composited to 1m downhole and data within dolerite dykes or vein zones are removed. Two Categorical Indicator values are determined for each mine area: •
A low-grade (LG) indicator to differentiate between background ‘waste’ and low-tenor mineralisation – 0.5 g/t Au.
• •
ASX:CYL
A high-grade (HG) indicator to define broad areas of higher-tenor mineralisation – 1.4 g/t
Au. Indicator variograms were modelled for the LG and HG thresholds for all mine areas. The indicator variograms for both grade thresholds exhibited a moderate nugget effect and demonstrated wellstructured continuity up to 30m. The CIK indicators were estimated using Ordinary Kriging into a finely gridded block model with block dimensions of 1.25m x 1.25m x 1.25m. The small block size
catalystmetals.com.au
75
Criteria
Commentary for the indicator process is beneficial for creating categorical sub-domains at resolution which can be used to accurately back-flag composite data. • Three categorical sub-domains were generated for low-grade (LG), medium-grade (MG) and highgrade (HG) areas. The HG sub-domain was based on an indicator probability threshold of 0.35 and the LG sub-domain was based on an indicator probability threshold of 0.65. The MG sub-domain is assigned to blocks that do not satisfy either the HG or LG sub-domain criteria. • The three categorical block model sub-domains (HG, MG and LG) were used to ‘back-flag’ the 1m composites from each mine area, thus creating a separate composite file for each sub-domain. • Assay top-cuts have been applied to the sub-domain composite files. The top cuts are generally above the 99th percentile of the distribution and have been aimed at globally limiting extreme values only. In this estimation methodology, top-cuts are not used as the primary tool to control metal risk. The use of grade thresholds and distance limiting is considered a more objective and influential method in controlling metal risk, while better reflecting the actual localised occurrence of discontinuous high-grade gold mineralisation. • The indicator cut-offs and assay top cuts for each domain are summarised below: Domain Code
Indicator
Mi ne Ma fi c Uni t (MMA)
LG
0.5
2
1000
MG
20
HG
1.4
300
LG
0.5
2
MG
10
HG
1.4
60
LG
0.5
2
MG
5
HG
1.4
20
Upper Ul tra ma fi c Uni t (UM1)
•
•
•
•
•
•
• •
• • •
ASX:CYL
Indicator Cut-offs Assay Top (Au g/t) Cut (Au g/t)
Area Group
2000
Lower Ul tra ma fi c Uni t (UM2)
3000
Overthrus t Ma fi c Uni t (OTM)
4000
LG
0.5
2
MG
10
HG
1.4
200
Given the similar spatial characteristics of mineralisation between Plutonic East and the Plutonic Mine, it was decided to use average grade variogram values modelled for the LG, MG and HG sub-domains for all mine areas from the Plutonic November 2023 MRE. The HG grade variograms exhibited a very high nugget effect (average 79%) with maximum ranges of only a few meters (average 3.4m). Grade variography undertaken on the HG domain confirms the extremely variable nature of Plutonic and Plutonic East mineralisation. Grade variography on the MG and LG domains resulted in lower nuggets effects and longer ranges. Grade thresholds for distance limiting were also applied using averages from the Plutonic November 2023 MRE. Grade thresholds and distance limits from the Plutonic November 2023 MRE were optimised following a detailed backward-looking mill reconciliation using mine stope voids for the period January 2023 to August 2023 (550Kt). The final applied grade distance limits for Plutonic East are follows: o 0-8 g/t = No Limit o 8-70 g/t = 10m o >70 g/t = 5.5m Prior to grade estimation, sub-domain codes from the 1.25m resolution block model are imported into a 2.5m x 2.5m x 2.5m resolution model and the proportion of LG, MG and HG is calculated for each 2.5m block. Grade estimation for the LG, MG and HG domains was undertaken in Surpac software using Ordinary Kriging with grade threshold distance limiting. Search routines and variogram orientations are drawn from the pre-populated dynamic search information recorded in each block. Final block grades at a 2.5m block resolution were calculated by weighting the estimated grades for each sub-domain by the relevant domain proportion. The parent estimation block size was 2.5m x 2.5m x 2.5m. A single-pass estimation strategy has been used across all domains, where a minimum of 3 and maximum of 12 composites have been utilised to estimate a block grade. It is possible that up to 36 composites can be used to estimate a parent block where there is a proportion of all three sibdomains present. Block discretisation was set at 3 E x 3 N x 3 RL points (per parent block). A standardised search ellipse of 25m x 25m x 6.25m was used. Octant restrictions were not used. Block sizes were selected based on drill spacing and expected mining selectivity. Typical data spacing varied from 3m x 3m to >40m x 40m. No selective mining units were assumed in the resource estimate.
catalystmetals.com.au
76
Criteria Moisture
Commentary • All estimations were carried out using a ‘dry’ basis.
Cut-off parameters
• •
Plutonic East Mineral Resources are reported at a cut-off grade of 1.5 g/t Au. The cut-off grade has been derived from current mining and processing costs and metallurgical parameters.
Mining factors or assumptions
•
The Plutonic East Mineral Resource is reported to a maximum vertical depth of 350m below the topographic surface at a 1.5 g/t Au cut-off grade for fresh material only. Mining selectivity is assumed to include a minimum mining width of 1.5m, minimum stope length of 5m, and a minimum stope height of 5m. No mining parameters or modifying factors have been applied to the Mineral Resource. Ore is currently being processed at the Plutonic Gold Plant. Recovery factors are assigned based on-current production metrics. No metallurgical modifying factors or assumptions have been built or applied to the resource model. The Plutonic underground operation is a going concern and as such previous practices have proven to be effective and practical. A conventional storage facility is used for the process plant tailings. The small amount of waste rock is stored in a traditional waste rock landform ‘waste dump’. Due to low sulphide content and the presence of carbonate alteration the potential for acid drainage formation is considered to be low. Bulk density is determined from drill core using a weight in air/weight in water Archimedes method. Currently there is a database of over 3,800 bulk density measurements which have been taken from mineralised and unmineralised intervals, with an ongoing sampling program in place. Samples of between 0.5 and 2.0kg are weighed in air and weighed in water. The following equation is used to derive bulk density Bulk Density = 𝑊𝑑 / (𝑊𝑑−𝑊𝑤). Bulk density was directly assigned by oxidation type and rock type: MMA/Mafic/Ultramafic/Dolerite o Fresh = 2.9 t/m3 o Transitional = 2.2 t/m3 o Oxide = 1.8 t/m3 Pit Backfill and Surface Dumps = 1.8 t/m3 Mineral Resources were classified as Indicated and Inferred to appropriately represent confidence and risk with respect to data quality, drillhole spacing, geological and grade continuity and mineralisation volumes. Additional considerations were the current understanding of mineralisation controls and mining selectivity within the mining environment. The drilling, surveying and sampling undertaken, and analytical methods and quality controls used, are appropriate for the style of deposit under consideration Factors considered when classifying the model include: o Given the high degree of grade variability and spatial complexity at Plutonic East (extremely high nugget effect and minimal short-scale spatial continuity), it is difficult to generate local scale grade estimates that would adequately satisfy a Measured Resource classification. For this reason, no Measured material has been included in the August 2026 MRE. o Due to the short-scale continuity of mineralisation, the portions of the MRE classified as Indicated are typically based on data spacing (DD, RC, SL and FS) less than or equal to 15 m x 15 m and located within close proximity to underground development. This drill spacing is appropriate for defining the continuity and volume of the mineralised domains and estimating robust global Mineral Resources. o The portions of the MRE classified as Inferred typically represent peripheral areas of the deposit where geological continuity is present but not consistently confirmed by 15 m x 15 m drilling or closer. The Mineral Resource classification appropriately reflects the view of the Competent Person. The geological interpretation, estimation parameters and validation of the resource model was peer reviewed by Catalyst staff. No external reviews of the resource estimate had been carried out at the time of writing. The relative accuracy of the Mineral Resource estimate is reflected in the reporting of the Mineral Resource as per the guidelines of the 2012 JORC Code. The statement relates to the global estimates of tonnes and grade. The estimation method adopted for the August 2026 MRE is believed to be appropriate for dealing with the high-degree of grade variability at Plutonic East. The estimated uncertainty for an Indicated Mineral Resource is typically +/- 20% over an annual
•
Metallurgical factors or assumptions
• • •
Environmental factors or assumptions
•
Bulk density
•
• •
• •
Classification
• •
• •
Audits or reviews
Discussion of relative accuracy/ confidence
• • • • • •
ASX:CYL
catalystmetals.com.au
77
Criteria
Commentary production period. • In most cases it is considered that only development/face sampling in conjunction with <10m x 10m drill spacing is sufficient to attain enough confidence for stoping.
Section 4 Estimation and Reporting of Ore Reserves Plutonic East (Criteria listed in section 1, and where relevant in sections 2 and 3, also apply to this section.) Criteria Mineral Resource estimate for conversion to Ore Reserves
Commentary • The Mineral Resource Estimate (MRE) used for the Plutonic East underground Ore Reserve is described in Section 3. •
Only the Indicated portion of the Mineral Resources are reported, and they are inclusive of the Ore Reserve. The Ore Reserves are a subset of the MRE and are spatially contained within the MRE.
Site visits
•
The Competent person is a full-time employee of Catalyst Metals and has conducted regular visits to the Plutonic Main and East mine sites the proposed processing and mining locations. The competent person has no concerns arising from these visits that would impact the Ore Reserve viability
• Study status
• •
•
• • • Cut-off parameters
• • • •
• Mining factors or assumptions
ASX:CYL
The Ore Reserve has been determined based on the current operational practises of the Plutonic East underground mine. The Ore Reserves were estimated using Deswik software. Stope shapes have been manually designed, with additional modifying factors applied within the scheduling phase to accommodate planned and unplanned dilution / ore loss factors. Stope shapes and development ore were then assessed (post applying all forms of modifying factors) for economic viability using an operating cut-off grade value (COG). Additionally, the entire Ore Reserve was economically assessed over the scheduled life to accommodate capital and time dependent cost factors. Previous operational performance has demonstrated that the current mining methods are technically achievable and are economically viable. The modifying factors used in the Ore Reserves calculations are based on achieved mining dilution and recovery factors. Capital and operating costs are derived from recent Plutonic East actual costs. Economic cut-off grades have been applied in estimating the Ore Reserve. Stope shapes that were spatially distant from the mine’s footprint were removed where they had excessive development costs to access that made them uneconomic. An underground cut-off grade of 1.5 g/t has been applied. A development cut-off grade of 0.5 g/t has been applied. Underground cut-off grades account for all mining, processing, surface haulage and administrative costs utilising a A$4,500 gold price. All royalties and metallurgical factors are also applied in the cut-off grade calculations. Capital and operating costs are derived from recent Plutonic East actual costs
Mining method •
Plutonic East is currently operated utilising longhole open stoping. The historic voids have been incorporated into the MRE and coded to ensure the method of fill determines proximity of stope shape generation. Geotechnical and Geological • As an existing operating mine, geotechnical parameters are well understood and applied under geotechnical procedures and geotechnical supervision • Grade control drilling costs and scheduling have been allowed for in evaluation Underground mine design • Underground stope shapes were manually designed, using a 3 m minimum mining width with minimum 10m stope strikes and sublevel spacings derived from geotechnical parameters and based on location within the mine.
catalystmetals.com.au
78
Criteria
Commentary • From the stope shapes generated, a mine design, schedule and financial evaluation were completed supporting technical achievability and economic viability Underground mining ore loss and dilution • As manually designed stope shapes, planned dilution is managed in the design phase at resource grade • An additional 10% of unplanned dilution at zero grade is applied in the schedule to all stopes • A mining recovery factor of 90% is applied to all stopes • Development has no dilution and 100% mining recovery applied Consideration of Inferred Mineral Resource • Any Inferred or Unclassified Mineral Resources captured within the underground mine plan have been assigned a zero-grade value and the material treated as waste.
Metallurgical factors or assumptions
•
Environmental
Mining licences / permits are currently granted for Plutonic East. Licences / permits include: • Department of Water and Environmental Regulation (DWER) Works Approvals. DWER licenses water abstraction and pollution discharge activities. • DMPE Mining Proposal and Mine Closure Plans (or historical Notice of Intent – NOI). Department of Mines, Petroleum and Exploration ("DMPE"). DMPE administers and regulates the activities of the mining industry under the provisions of the Mining Act. • Native Vegetation Clearing Permit ("NVCP") under Part V of the EP Act and the Environmental Protection (Clearing of Native Vegetation) Regulations 2004. • Ground Water Licences - The abstraction of groundwater for water supply and/or mine dewatering purposes requires licences to be issued by the DWER (Water Section) under section 5C of the Rights in Water and Irrigation Act 1914 (the "RIWI Act"). • Activities undertaken onsite are required to be undertaken in accordance with the above environmental approvals. Monitoring programs are conducted to ensure that key approval and licence requirements are complied with. • The Plutonic East Gold Mine is a well-established mine which has services and infrastructure consistent with an operating mine. • The existing site infrastructure can support the current mine plan
Infrastructure
Costs
•
• • • •
Metallurgical factors at Plutonic East are well understood as the ore is currently being processed at the Plutonic processing plant An 84% metallurgical recovery factor of has been applied based on actual performance
Capital costs are based on current costs at Plutonic East Underground, and recent quoted vendor pricing Operating costs are derived from the operating Plutonic East Underground using current costs. Allowances have been made for State royalties (2.5%) payable on net revenue. Processing costs reflect the current Plutonic Processing Plant actual costs.
Revenue factors
• •
The Ore Reserve Estimate is generated at a gold price of A$4,500/oz. The competent person considers the gold price to be appropriate given the current gold spot price
Market assessment
•
Gold metal is a freely and widely traded commodity with a transparent mechanism for setting prices and for sale of gold produced. Catalyst has not conducted any studies or analyses such as commodity price projections, product valuations, market entry strategies, or product specification requirements.
• Economic
•
The Plutonic East operation is economically robust and generates positive cashflow using the afore mentioned costs, revenue factors and discount rate of 7%.
Social
•
Catalyst continues to engage with stakeholders of the operation – local community, native title owners, Shire members and pastoralists. Catalyst is committed to strong environmental and social performance. There are no identified threats that place the company’s social licence to operate at risk.
ASX:CYL
catalystmetals.com.au
79
Criteria Other
Commentary • No material risks or impacts are identified • No other matters, other than disclosed in this Table 1 are considered material to the estimation and reporting of this Ore Reserve
Classification
•
Audits or reviews Discussion of relative accuracy/ confidence
•
The Ore Reserves classification reflects the Competent Person’s view of the deposit. Only Probable reserves have been declared and are based on Indicated Resources following consideration of appropriate modifying factors. No probable Ore Reserves were derived from Measured Resources.
•
No reviews or audits have been conducted on the Ore Reserves.
•
Plutonic East is an operating, underground owner operator site, utilising the existing and operating 2.0Mtpa process plant. The accuracy of the Ore Reserve estimate is largely dependent on the geological estimate, and so reflects the confidence in the Mineral Resource. The Ore Reserve is a global estimate. All modifying factors, including but not limited to, dilution and recovery, mining and processing recoveries, geotechnical parameters and cost inputs and resulting application are appropriate for the Ore Reserve estimate.
• • •
Section 4 Estimation and Reporting of Ore Reserves Keillor Deposit (Criteria listed in section 1, and where relevant in sections 2 and 3, also apply to this section.) Criteria Commentary Mineral Resource estimate for conversion to Ore Reserves
•
The Mineral Resource Estimate (MRE) used for the Keillor open pit and underground Ore Reserve is described in Section 3.
•
Only the Indicated portion of the Mineral Resources are reported, and they are inclusive of the Ore Reserve. The Ore Reserves are a subset of the MRE and are spatially contained within the MRE.
Site visits
•
The Competent person is a full-time employee of Catalyst Metals and has conducted regular visits to the Keillor and Plutonic mine sites, the proposed mining and processing locations. The competent person has no concerns arising from these visits that would impact the Ore Reserve viability The open pit Ore Reserve has been generated from a Pre-Feasibility level assessment, appropriate for the size and scale of proposed operations. The study has both internal Catalyst personnel and external consultants provide inputs into the mine plan with appropriate geotechnical, hydrological, equipment, metallurgical and mining method information. Mining costs have been derived from recent open pit Western Australian contractor quotations. All other costs are based on recent actual Catalyst costs and recent vendor quotations. The underground Ore Reserve has been determined based on the current operational practises of the Keillor underground mine. Underground mining costs have been derived from recent actual Keillor underground costs, in addition to recent vendor quotations. Modifying factors accurate to the study level have been applied. The resulting mine plans for both the open pit and underground are technically achievable and economically viable.
• Study status
•
• • •
Cut-off parameters
• • •
ASX:CYL
Economic cut-off grades have been applied in estimating the Ore Reserve. Stope shapes that were spatially distant from the mine’s footprint were removed where they had excessive development costs to access that made them uneconomic. An underground cut-off grade of 1.6 g/t has been applied. A development cut-off grade of 0.6 g/t has been applied.
catalystmetals.com.au
80
Criteria
Commentary An open pit cut-off grade of 0.6 g/t has been applied Underground and open pit cut-off grades account for all mining, processing, surface haulage and administrative costs utilising a A$4,500 gold price. All royalties and metallurgical factors are also applied in the cut-off grade calculations. • Underground capital and operating costs are derived from recent Keillor actual costs • Open pit capital and operating costs are derived from contractor pricing estimates and Catalyst recent actuals Mining method • Keillor underground is currently operated under an owner-operator model and utilises longhole stoping methods • The proposed open pit mining method is a conventional truck/shovel fleet comprised of 90t excavators and 60t haul trucks to be mined utilising a mining contractor Geotechnical and Geological • As an existing underground operating mine geotechnical parameters are well understood and applied under geotechnical procedures and geotechnical supervision • A pre-feasibility study was conducted on the Keillor Open pit with geotechnical parameters applied as per the study recommendations • Grade control drilling costs and scheduling have been allowed for in evaluation of both the open pit and underground mine plans • The competent person considers these mining methods appropriate for the Keillor deposit Open Pit optimisation and design • Open pit optimisations were completed in Whittle mining software. Pit optimisations were completed at a A$4,500/oz gold price and exclude inferred and unclassified resources. • From the open pit optimisation, a pit design, mining schedule and financial assessment were completed confirming technical achievability and economic viability. Open Pit mining ore loss and dilution • In the open pit Ore Reserve representative dig blocks were generated to determine appropriate dilution and ore loss factors. • Dilution factors of 17% in oxide, 19% in transitional and 21% in fresh material have been applied. • A mining recovery factor of 93%, or stated as a 7% ore loss allowance, has been applied. Underground stope optimisation and design • Underground stope shapes were designed using Deswik stope optimiser • DSO input parameters include a 1.6 g/t Au cut-off, minimum mining width 2.5m, minimum stope length of 10m, stope height of 15-20m and a gold price of A$4,500/oz. • The orientation of DSO’s is variable depending on the geometry of the mineralisation. • From the stope shapes generated, a mine design, schedule and financial evaluation were completed supporting technical achievability and economic viability Underground mining ore loss and dilution • Dilution of 0.5 m on both HW and FW are included in the underground stope shapes at MRE grade. • Mining recovery of 95% has been utilised in the stopes, representing 5% bogging losses • Development has no dilution and 100% mining recovery applied Consideration of Inferred Mineral Resource • Any Inferred or Unclassified Mineral Resources captured within the underground and open pit mine plans have been assigned a zero-grade value and the material treated as waste. • •
Mining factors or assumptions
Metallurgical factors or assumptions
ASX:CYL
•
The metallurgical characteristics of Keillor are well known as the ore is currently being processed at the Plutonic processing plant.
catalystmetals.com.au
81
Criteria
Commentary
Environmental
•
A metallurgical recovery factor of 94% has been applied based on actual performance through the Plutonic mill, with recent actual processing costs used in the applied cutoff grades and economic analysis.
• •
Mining licences / permits are currently granted for Keillor. Licences / permits include: • Department of Water and Environmental Regulation (DWER) Works Approvals. DWER licenses water abstraction and pollution discharge activities. • DMPE Mining Proposal and Mine Closure Plans (or historical Notice of Intent – NOI). The Department of Mines, Petroleum and Exploration ("DMPE"). DMPE administers and regulates the activities of the mining industry under the provisions of the Mining Act. • Native Vegetation Clearing Permit ("NVCP") under Part V of the EP Act and the Environmental Protection (Clearing of Native Vegetation) Regulations 2004. • Ground Water Licences - The abstraction of groundwater for water supply and/or mine dewatering purposes requires licences to be issued by the DWER (Water Section) under section 5C of the Rights in Water and Irrigation Act 1914 (the "RIWI Act"). Activities undertaken onsite are required to be undertaken in accordance with the above environmental approvals. Monitoring programs are conducted to ensure that key approval and licence requirements are complied with.
•
•
Infrastructure
• Costs
• • • •
The Keillor Gold Mine is a well-established mine which has services and infrastructure consistent with an operating mine. The existing and planned site infrastructure can support the current mine plans for both underground and open pit mining Capital costs are based on current costs at Keillor underground, and recent vendor pricing Operating costs are derived from the operating Keillor underground using current costs. Allowances have been made for State royalties (2.5%) payable on net revenue. Processing costs reflect the operating Plutonic Processing Plant actual costs.
Revenue factors
• •
The Ore Reserve Estimate is generated at a gold price of A$4,500/oz. The competent person considers the gold price to be appropriate given the current gold spot price
Market assessment
•
Gold metal is a freely and widely traded commodity with a transparent mechanism for setting prices and for sale of gold produced. Catalyst has not conducted any studies or analyses such as commodity price projections, product valuations, market entry strategies, or product specification requirements.
•
Economic
•
The Keillor operation is economically robust and generates positive cashflow using the afore mentioned costs, revenue factors and a discount rate of 7%.
Social
•
Other
• •
Catalyst continues to engage with stakeholders of the operation – local community, native title owners, Shire members and pastoralists. Catalyst is committed to strong environmental and social performance. There are no identified threats that place the company’s social licence to operate at risk. No material risks or impacts are identified No other matters, other than disclosed in this Table 1 are considered material to the estimation and reporting of this Ore Reserve
Classification
•
•
ASX:CYL
The Ore Reserves classification reflects the Competent Person’s view of the deposit. Only Probable reserves have been declared and are based on Indicated Resources following consideration of appropriate modifying factors. No probable Ore Reserves were derived from Measured Resources.
catalystmetals.com.au
82
Criteria
Commentary
Audits or reviews Discussion of relative accuracy/ confidence
• • • • • •
ASX:CYL
No reviews or audits have been conducted on the Ore Reserves. Keillor is an operating, underground owner operator site, utilising the existing and operating 2.0Mtpa process plant at Plutonic. The accuracy of the Ore Reserve estimate is largely dependent on the geological estimate, and so reflects the confidence in the Mineral Resource. The open pit Ore Reserve has been completed to a Pre-Feasibility study level of assessment. The Ore Reserve is a global estimate. Modifying factors including dilution and recovery, mining and processing recoveries, geotechnical parameters and cost inputs and resulting application are appropriate for the level of study.
catalystmetals.com.au
83
Northern Hemisphere Roadshow Catalyst’s journey in building a gold mining business September 2026
A S X : CY L
CATALYST METALS LIMITED
Corporate Overview Market capitalisation
A$1.6b Available funds
A$531m
Debt
Nil
Plutonic Gold Belt Operating (104koz pa)
Perth Head office
(A$331m cash plus undrawn A$200m revolving debt facility at 30 June 2026)
Bendigo Gold Belt Exploration
104koz Group Reserves1
2.0Moz
Substantial Shareholders Group Resources1
5.1Moz
Board & Management
5%
Institutions
46%
Other
49%
ASX:CYL
FY26 production2
2
2 (1)
ASX An nouncement 29 th Sep tember 2026 “2Moz Reser ve at Plu tonic”
(2) ASX Announ cement 31 J uly 2026 “Quarter ly Activities Repo rt July 2026”
CATALYST METALS LIMITED
Pivotal moments in Catalyst’s history and our view on shareholder returns in gold mining
ASX:CYL
The journey to today
3
3
CATALYST METALS LIMITED
Catalyst history 15 years in 15 minutes…
ASX:CYL
Victoria
4
Pre-2021
2022
2023
2024
2025
2026
4
2011 CATALYST METALS LIMITED
Bendigo Gold Belt An early strategy to control gold belts In 2011, as a microcap junior explorer, Catalyst secured 75km of strike length immediately north of the historic 22Moz3 Bendigo Goldfields. The thesis was securing a large landholding neighbouring world scale mineral endowment Four Eagles
A belt scale opportunity
100km
but… Required time and capital
ASX:CYL
Bendigo Inglewood
Melbourne
Maldon Processing Plant
(1) (2) (3) (4)
JORC Resou rce Anno uncement 15 June 2023 “Mai den Miner al Resour ce at Fou r Eagles pro ject” Fosterville-Gold-Mi ne-Victoria-Australia-Up dated-NI-43-101-Technical-ReportApr-1-2019 https://earthresources.vic.gov.au/geology-exploratio n/minerals/ metals/gold CYL Announcemen t 24 March 2025 “Catalyst to sell Henty while simu ltaneou sly unlo cking valu e i n Victor ia”
Category UG Resources
Bendigo Goldfields 22Moz3
Bendigo Resources1 Tonnes (Mt) Grade (g/t) 0.7 7.2
Fosterville Goldfield 2.3Moz at 50g/t2
5
5
Ounces (koz) 163
Catalyst controlling interest
CATALYST METALS LIMITED
Catalyst history 15 years in 15 minutes…
ASX:CYL
Victoria
Henty acquisition & turnaround
6
Pre-2021
2022
2023
2024
2025
2026
6
Henty Gold Belt (sold March 2025)
Acquired January 2021 – sold March 2025
An attempt to fund exploration from cashflows via a cheaply acquired belt scale operation in Western Tasmania, Australia
Operational turnaround by Catalyst ~40% increase in production +500% increase in mine life (from 1 to 5 years)
CATALYST METALS LIMITED
2021 to 2025
Av. 25koz
25
25
25
Av. 18koz
Sold to Kaiser Reef (ASX:KAU)
20
18
16
FY2019
FY2020
FY2021
FY2022
FY2023
FY2024
FY2025
ASX:CYL
23
7
Prior owners 7 (1) So urced from internal records and ASX announ cement 11 Octob er 2024 “ Annu al Upd ate o f Mi neral Reso urce and Ore Reserve St atement”
CATALYST METALS LIMITED
Catalyst history 15 years in 15 minutes…
Henty acquisition & turnaround
Plutonic consolidation
ASX:CYL
Victoria
8
Pre-2021
2022
2023
2024
2025
2026
8
Plutonic Gold Belt consolidation Combining high-grade undeveloped deposits with latent infrastructure An opportunity to upgrade Catalyst’s assets In the short term, paired high-grade deposits with latent processing capacity; longer term it gave Catalyst control of a large 12Moz 1 mineral endowment
CATALYST METALS LIMITED
January 2023 to June 2023
Vango
(high-grade development projects and exploration)
June 2023 Acquisition of Superior Gold
Superior Gold
(Operating mine & infrastructure)
ASX:CYL
March 2023 Acquisition of Vango Mining
Plutonic Gold Belt
9
(1) (2) (3)
Historical production figures reported in Superior Gold’s prospectus dated 15 February 2017 and announcements dated 15 January 2018, 5 February 2019, 11 February 2020, 25 February 2021, 8 March 2022 and 28 November 2022 (available at Superior Gold’s SEDAR profile). Past production is for illustrative purposes and not an indication of future performance. CYL announcement 29 Sept 2026 “2Moz Reserve at Plutonic” CYL announcement of acquisition 10 Jan 202 3 “Recommended bid to acquire Vango Mining Limited” CYL announcement of acquisition 24 Feb 2023 “Catalyst to acquire Plutonic Go ld Mine” (C$55m at exchange rate of 1.09 as per xe.com)
9
Henty acquisition & turnaround
Plutonic consolidation
Operational turnaround ASX:CYL
Victoria
CATALYST METALS LIMITED
Catalyst history
10
Pre-2021
2022
2023
2024
2025
2026
10
Plutonic Gold Belt – operational turnaround Experiences from Henty turnaround applied at Plutonic
40% improvement in key operating metrics → 46% increase in gold production
Stoping Tonnes +47%
Average 258kt
CATALYST METALS LIMITED
July 2023 to June 2024
Gold Produced +46% Average 21koz
Average 175kt
Q1 22 Q2 22 Q3 22 Q4 22 Q1 23 Q2 23 Q3 23 Q4 23 Q1 24 Q2 24
Q1 22 Q2 22 Q3 22 Q4 22 Q1 23 Q2 23 Q3 23 Q4 23 Q1 24 Q2 24
ASX:CYL
Average 14koz
11
11 Note: Sourced from inter nal recor ds and Catalyst AS X announcemen t 11 S eptember 2024 “Renewi ng the Pluton ic Gold Belt”
CATALYST METALS LIMITED
Catalyst history 15 years in 15 minutes…
Plutonic 10year vision
Henty acquisition & turnaround
Plutonic consolidation
Operational turnaround ASX:CYL
Victoria
12
Pre-2021
2022
2023
2024
2025
2026
12
Hub and spoke – 2Moz of Reserves, supporting 10 years at ±200koz pa
The potential for a long-term stable gold producer of scale within a well known, large gold belt
CATALYST METALS LIMITED
Catalyst’s Vision for Plutonic
September 2024
The Hub Centralised infrastructure
… required refurbishment
The Spokes … required drilling & development ASX:CYL
Multiple Resources The Future Lower risk exploration
… required drilling & expertise
13
Foundation of existing infrastructure
Camp, gas fired power station, haul road, workshops, TSF
13
CATALYST METALS LIMITED
Catalyst history 15 years in 15 minutes…
Corporate reset
Plutonic 10-year vision
Henty acquisition & turnaround
Plutonic consolidation
Operational turnaround ASX:CYL
Victoria
14
Pre-2021
2022
2023
2024
2025
2026
14
Management need time and money to ensure success
Early 2025 was a pivotal six months in the company’s history
CATALYST METALS LIMITED
Setting up Catalyst for success
May 2025 – July 2025
ASX:CYL
While continuing to run Plutonic, it was important to simplify management’s focus and ensure it had a ‘fortress’ balance sheet
15
15
CATALYST METALS LIMITED
Catalyst history 15 years in 15 minutes…
Trident expansion Corporate reset
Plutonic 10-year vision
Henty acquisition & turnaround
Plutonic consolidation
Operational turnaround ASX:CYL
Victoria
16
Pre-2021
2022
2023
2024
2025
2026
16
CATALYST METALS LIMITED
Trident: +60 - 80koz per year for +10 years Exploration success
20241
20263
20252
5.4 g/t
5.2 g/t
1.4
600m
600m
600m
1
3.6 g/t
1.1 Moz
0.8
0.8 Moz
0.6
0.4
0.5 Moz
ASX:CYL
1.2
17
0.2
0
Resources (Moz)
Grade (g/t Au)
So urces: (1) ASX An nouncement 11 Sep tember 2024 “1Moz Reser ve allows Catalyst to do uble pr oduction for A$31m” (2) ASX Anno uncement 10 Septemb er 2025 “ Plutonic Reserv es Dou ble, Suppo rting Growth Plans” (3) ASX Ann ouncement 29 th Sep tember 2026 “2Mo z Reserve at Plutonic”
17
15 years in 15 minutes… Trident expansion
CATALYST METALS LIMITED
Catalyst history Cinnamon discovery
Corporate reset
Plutonic 10-year vision
Henty acquisition & turnaround
Plutonic consolidation
Operational turnaround ASX:CYL
Victoria
18
Pre-2021
2022
2023
2024
2025
2026
18
CATALYST METALS LIMITED
Cinnamon: +40-50koz per year A base load ore source
2024 20241
400m
400m
400m 600m
20263
20252
1.8g/t
1.5g/t
541koz
ASX:CYL
2.5g/t
19
119koz
145koz Resources (Moz)
Grade (g/t Au)
So urces: (1) ASX Annou ncement 11 September 2024 “1Moz Reserve allows Catalyst to double produ ction for A$31m” (2) ASX Announ cement 10 September 2025 “Pluto nic Reserves Double, Supporti ng Growth Plans” (3) ASX Announ cement 29 th Sep tember 2026 “2Mo z Reserve at Plutonic”
19
Catalyst history 15 years in 15 minutes… Trident expansion
Cinnamon discovery
Corporate reset
CATALYST METALS LIMITED
New mine developments
Plutonic 10-year vision
Henty acquisition & turnaround
Plutonic consolidation
Operational turnaround ASX:CYL
Victoria
20
Pre-2021
2022
2023
2024
2025
2026
20
Four mines developed over two years
1x operating mine
3x operating mines 1x mine in development 2x mines in approval stage
No development pipeline
Strong exploration pipeline
2023
2026
ASX:CYL
CATALYST METALS LIMITED
Delivering six ore sources
21
21
Catalyst history 15 years in 15 minutes… Trident expansion
Cinnamon discovery
Corporate reset
2Moz Reserve
CATALYST METALS LIMITED
New mine developments
Plutonic 10-year vision
Henty acquisition & turnaround
Plutonic consolidation
Operational turnaround ASX:CYL
Victoria
22
Pre-2021
2022
2023
2024
2025
2026
22
CATALYST METALS LIMITED
Two-Million-Ounce Reserve Adding high-grade inventory 2.0Moz at 2.6g/t
1.8Moz Reserve growth over 3 years Addition of higher-grade Reserves Cost of ~A$125 per Reserve ounce*
Underground
1.0 Moz
1.0Moz at 3.8g/t Au
1.8Moz
0.5Moz at 2.9g/t
1.0 Moz
0.3Moz
0.8Moz at 2.3g/t Au
Open pit 0.2Moz at 1.4g/t Au
Sept 2023 Note *: includes all-in acquisition and exploration cost of Reserves (1) AS X announcement 10 September 2025 “Plutonic Belt Reserves double, supporting long term growth plans” and “Investor Presentation” (2) AS X announcement 29 September “2Mo z Reserve at Plutonic”
Depletion
Reserve growth
Sept 2026
ASX:CYL
0.5Moz
Underground
23
Low-grade Reserves (< 3g/t Au) High-grade Reserves (> 3g/t Au)
23
CATALYST METALS LIMITED ASX:CYL
Catalyst today
A focus on delivering the vision for Plutonic
24
24
The vision becoming reality 40km Haul Road
3
Plutonic Belt Strategy
30km
Keillor Underground UG Mine Operating
3
UG Reserves: 0.8Mt at 3.8g/t for 101koz Mining rate: 150ktpa (~20koz pa)
6 mines into 1 processing plant
20km
Delineate ±2Moz Reserve
4
6
Produce ±200koz pa for ±10years
Processing Hub • 2Mtpa plant • Airstrip • Gas power • Camp, office, etc
Cinnamon
6
10km
CATALYST METALS LIMITED
Plutonic Belt Overview
Studies/approvals OP Reserves: 2.0Mt at 1.4g/t for 88koz UG Reserves: 2.4Mt at 3.0g/t for 232koz Target mining rate: 500ktpa (~45koz pa)
1
2 4
Trident UG Mine Open Pit complete UG in development
50km
1 2
Operating UG Reserves: 10.6Mt at 2.3g/t for 792koz Mining rate: 1.2 to 1.4Mtpa (~90 to 100koz pa)
Secondary sealed airstrip
5
Plutonic Main & East UG Mines
25
5
Old Highway OP & UG Mine Permitting OP Reserves: 1.2Mt at 1.4g/t for 54koz UG Reserves: 0.7Mt at 4.8g/t for 101koz Target mining rate: 250ktpa (~35koz pa)
(1)
Refer to CYL announcement 10 September 2025 “Investor Presentation”
Catalyst tenements
ASX:CYL
UG Reserves: 3.9Mt at 4.2g/t for 524koz Mining rate: ~400 to 500ktpa (~60koz pa)
2 Refer to CYL Announcement 29th September “2Moz Reserve at Plutonic”
50km Plutonic Gold Belt
25
All components now in place – focus shifts to ramping up developments COMING YEARS
Infrastructure refurbishment Well underway
✓ Delivered
✓ Delivered
✓ Delivered
✓ Delivered
Ramping up production
Setting mines up for long term success
● Underway
Components for ±200koz in place Situation evolving quickly – new discoveries, operational changes – how this comes together in medium term will move around
● Now
ASX:CYL
L AST 3 YE ARS
CATALYST METALS LIMITED
Plutonic – executing the vision and the plan
26
In meantime, our existing operating platform reduces risk 26
Gold Production (koz) Pipeline Resources Cinnamon, Hermes, Triple P, Parrot/Rosella
Contingency
(not included)
200koz pa
Catalyst’s 2025 vision / general guidance 165-185
A$2,200/oz to 130-150 A$2,650/oz
Steady state production and grade1
2,500/oz
2,400/oz
2,300/oz
2,100/oz
2,000/oz
100-110
2.7
3.0
1,900/oz
2,250/oz
1,750/oz
2,250/oz
1,750/oz
2,250/oz
1,750/oz
2,250/oz
1,750/oz
2,250/oz
1,750/oz
2,250/oz
1,750/oz
Grade (g/t Au)
3.2
3.3
3.3
3.3
3.3
3.3
3.3
2029
2030
2031
2032
2033
2034
2035
2.3
2026
2027
2028
AISC A$/oz
Old Highway
35koz
4.8g/t
K2
20koz
4.3g/t
Trident
60koz
4.8g/t
Plutonic East
15koz
2.5g/t
Plutonic Main
85koz
2.3g/t
200-215koz
CATALYST METALS LIMITED
A vision showing the longer-term potential of Plutonic
ASX:CYL
The vision in 2025…
27
Reserves
Resources
Exploration Target 27
(1) AS X announcement 10 September 2025 “Plutonic Belt Reserves double, supporting long term growth plans”
Gold Production (koz)
Sixth ore source displacing Resources/exploration Cinnamon Reserve increase to 320koz
200koz pa
Pipeline Resources Hermes, Triple P, Parrot/Rosella
Contingency
(not included)
Catalyst’s 2025 vision / general guidance 165-185
A$2,200/oz to 130-150 A$2,650/oz
Steady state production and grade1,2
2,500/oz
2,400/oz
2,300/oz
2,100/oz
2,000/oz
100-110
2.7
3.0
1,900/oz
3.2
2,250/oz
1,750/oz
3.3
2,250/oz
1,750/oz
3.3
2,250/oz
1,750/oz
3.3
2,250/oz
1,750/oz
2,250/oz
1,750/oz
2,250/oz
1,750/oz
Grade (g/t Au) 3.3
3.3
35koz
4.8g/t
Keillor
20koz
3.8g/t
Trident
60koz
4.2g/t
Plutonic East
15koz
2.1g/t
Plutonic Main
85koz
2.3g/t
3.3
2.3
2026
AISC A$/oz
Old Highway
200-215koz
New sixth ore source 2027
2028
2029
2030
2031
2032
2033
2034
2035
Cinnamon
40koz
CATALYST METALS LIMITED
A sixth ore source increases contingency
ASX:CYL
The vision in 2025…
3.0g/t 28
Reserves
Resources
Exploration Target 28
(1) AS X announcement 10 September 2025 “Plutonic Belt Reserves double, supporting long term growth plans” (2) Refer to CYL Announcemen ts 29th Sep tember “2Mo z Reserv e at Pluton ic”
A foundation asset of a gold business
Catalyst is a business first, a gold miner second
CATALYST METALS LIMITED
Summary
Plutonic has the foundations to be a long-term, stable pillar of the business
In the meantime, the organic opportunity is clear – deliver ±200koz for ±10years
ASX:CYL
Inorganic opportunities are being looked at - opportunities are rare
29
29
Reserves 2,3,4,8
Probable
Tonnes (Mt) Grade (g/t Au) Ounces (koz) Tonnes (Mt) Grade (g/t Au) Ounces (koz) Tonnes (Mt) Grade (g/t Au) Ounces (koz)
Plutonic Belt Low-Grade
Plutonic Belt High-Grade
Total Reserves
Resources1,2,3,5,6,7
Mineral Resource
Total
15.5
2.0
7.8
3.8
23.3
2.6
Measured
Tonnes (Mt)
Grade (g/t Au)
1,012
15.5
2.0
958
7.8
3.8
958
1,971
23.3
2.6
1,971
Indicated
Ounces (koz) Tonnes (Mt)
4.7
Inferred
Ounces (koz) Tonnes (Mt) 1,307
5.7
Grade (g/t Au) 3.8
Total
Ounces (koz) Tonnes (Mt) 701
14.5
Grade (g/t Au)
Ounces (koz)
4.4
2,030
Plutonic Belt High-Grade
Plutonic Belt Low-Grade
29.5
2.8
2,664
5.0
1.7
272
34.0
2.7
2,935
Total Plutonic
38.2
3.3
3,979
10.7
2.8
973
48.9
3.2
4,951
0.5
5
73
0.2
13
90
0.7
8
163
Total Bendigo
0.5
4.5
73
0.2
14
90
0.7
7.2
163
Group Total
38.7
3.3
4,051
10.9
3.0
1,063
49.5
3.2
5,114
Bendigo Gold Project 1
8.7
Grade (g/t Au)
1,013
ASX:CYL
Ore Reserve
Proven
APPENDICES
Group Reserves and Resources
30
(1) (2) (3) (4)
CYL announcement 15 June 2023 “Maiden M ineral Resource of 163,000oz at Four Eag les project” CYL announcement 29 September 2026 “2M oz Reserve at Plutonic” CYL anno uncement 11 September 2024 “1Moz Reserve allows Cataly st to doub le prod uction for A$31m” CYL anno uncement 21 September 2026 “Cinnamo n Resource grows 370%, mai den undergroun d Reserve”
CYL anno uncement 22 February 2023 “Mar ymia Gold Project Mineral Resource - Up dated”. CYL announcement 9 September 2026 “Keillor Resource grows by 280%” CYL announcement 8 May 2025 “Catalyst acquires Old Highway Gold Project” CYL announcement 14 September 2026 “Trident Reserve G rows by 30% ”
30
IMPORTANT NOTICE AND DISCLAIMER This investor presentation (the Presentation) has been prepared by Catalyst Metals Limited (ASX: CYL) (Catalyst or the Company). SUMMARY INFORMATION
This Presentation contains summary information about Catalyst its respective subsidiaries and activities and is current as at the date of this Presentation, unless otherwise indicated. The information in this Presentation is of general nature, provided for information purposes only, and does not purport to be complete. This Presentation is not, and should not be considered an invitation or recommendation to subscribe for, acquire or buy any securities of Catalyst in any jurisdiction. This Presentation does not purport to contain all the information that an investor should consider when making any investment decision involving Catalyst nor does it contain all the information which would be required in a prospectus, registration statement, or other disclosure document prepared in accordance with the requirements of applicable securities laws and/or corporate laws of Australia, Canada, the United States, or any other jurisdiction, and further, has not been lodged with the Australian Securities and Investments Commission (ASIC) or any securities regulatory authority in Canada, the United States, or any other jurisdiction. INFORMATION ABOUT CATALYST
CATALYST METALS LIMITED
Disclaimers
The historical information in this Presentation with respect to Catalyst is, or is based upon, information that has been released to the Australian Stock Exchange (ASX) in Australia. This Presentation should be read in conjunction with Catalyst’s other periodic and continuous disclosure announcements lodged with the ASX, which are available at www.asx.com.au. THIRD PARTY INFORMATION Certain information contained on this Presentation with respect to other companies and their business and operation, as well as market and industry data, has been obtained or quoted from publicly available sources, such as continuous disclosure documents, independent publications, media articles, third party websites (collectively, the “Publications”). In certain cases, these sources make no representations as to the reliability of the information they publish. Further, the analyses and opinions reflected in these Publications are subject to a series of assumptions about future events. There are a number of factors that can cause the results to differ materially from those described in these publications. None of Catalyst or their respective representatives have independently verified the accuracy or completeness of the information contained in the Publications or assume any responsibility for the completeness or accuracy of the information derived from these Publications. This Presentation does not constitute an offer to sell, or a solicitation of an offer to buy any securities in any jurisdiction. The distribution of this Presentation and the offer of securities is restricted in jurisdictions outside Australia. See the section of this Presentation captioned “International Offering Jurisdictions” for more information. Any failure to comply with such restrictions could constitute a violation of applicable securities laws. CERTAIN UNITED STATES MATTERS
NO FINANCIAL PRODUCT OR INVESTEMENT ADVICE This Presentation, and the information provided in it, does not constitute, and is not intended to constitute, financial product or investment advice, financial, legal, tax accounting or other advice, or a recommendation to acquire any securities of Catalyst. It has been prepared without taking into account the objectives, financial or tax situation or particular needs of any individual investor. Before making any investment decision with respect to Catalyst, prospective investors should consider the appropriateness of the information having regard to their own objectives, financial and tax situation and needs and seek professional advice from their legal, financial, taxation or other independent adviser (having regard to the requirements of all relevant jurisdictions). Catalyst is not licensed to provide financial product advice in respect of an investment in any securities. The release, publication or distribution of this Presentation (including an electronic copy) outside Australia may be restricted by law. If you come into possession of this presentation, you should observe restrictions and should seek your own advice on restrictions. Any non-compliance with these restrictions may contravene applicable securities laws.
EFFECT OF ROUNDING A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
ASX:CYL
This Presentation has been prepared for publication in Australia and Canada and may not be released to US wire services or be distributed or released in the United States. This document does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States or in any other jurisdiction in which such offer, solicitation or sale would be unlawful. The securities of Catalyst have not been, and will not, be registered under the U.S. Securities Act of 1933, as amended (the U.S. Securities Act) or any state securities laws and may not be offered or sold in the United States except in transactions exempt from, or not subject to, the registration of the U.S. Securities Act and applicable securities laws of any state or other jurisdiction of the United States.
31
PAST PERFORMANCE Past performance information given in this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of future performance.
31
FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS Some statements in this Presentation regarding estimates or future events are forward-looking statements. They include indications of, and guidance on, future matters. Forward-looking statements include, but are not limited to, statements preceded by words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions. Forward-looking statements, opinions and estimates included in this Presentation are based on assumptions and contingencies which are subject to change without notice, as are statements about market and industry trends, which are based on interpretations of current market conditions. Forward-looking statements are provided as a general guide only and should not be relied on as a guarantee of future performance. Forward-looking statements may be affected by a range of variables and risks that could cause actual results to differ from estimated results and may cause Catalyst’s actual performance and financial results in future periods to materially differ from any projections of future performance or results expressed or implied by such forward-looking statements. These risks and uncertainties include but are not limited to liabilities inherent in mine development and production, geological, mining and processing technical problems, the inability to obtain any additional mine licenses, permits and other regulatory approvals required in connection with mining and third party processing operations, competition for among other things, capital, acquisition of reserves, undeveloped lands and skilled personnel, incorrect assessments of the value of acquisitions, changes in commodity prices and exchange rate, currency and interest fluctuations, various events which could disrupt operations and/or the transportation of mineral products, including labour stoppages and severe weather conditions, the demand for and availability of transportation services, the ability to secure adequate financing and management’s ability to anticipate and manage the foregoing factors and risks. These and other factors should be considered carefully and readers should not place undue reliance on such forward-looking information. There can be no assurance that forward-looking statements will prove to be correct.
CATALYST METALS LIMITED
Disclaimers
The information in this Presentation that relates to the Production Targets Catalyst’s projects are extracted from Catalyst’s ASX announcement of 11th September 2024 titled “1Moz Reserve allows Catalyst to double production for A$31m ". Catalyst confirms that all material assumptions underpinning the Production Targets continue to apply and have not materially changed.
JORC CODE 2012 Mineral Resources, Ore Reserves, Exploration Results and Production Target The information in this presentation that relates to exploration results or estimates of mineral resources and ore reserves are extracted from ASX announcements dated 13 May 2026 , 23 October 2025, 19 January 2026, 15 May 2026, 18 February 2026, 8 May 2025, 7 May 2026, 4 August 2025, 10 September 2025, 21 January 2025 and 27 January 2026 and those referenced throughout the presentation which are available on the Company website www.catalystmetals.com.au and the ASX website (ASX code: CYL).
Production targets and forecast financial information included in this presentation are extracted from ASX announcements dated 8 May 2025 and 10 September 2025 and those referenced throughout the presentation and are available on the Company website www.catalystmetals.com.au and the ASX website (ASX code: CYL). Catalyst confirms that all material assumptions underpinning the production targets, or the forecast financial information derived from a production target, in the initial public report continue to apply and have not materially changed.
ASX:CYL
Catalyst confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates of mineral resources and ore reserves in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcements.
32
32
ASX Announcement 21 September 2026 Catalyst Metals’ flagship asset is the 40km long Plutonic Gold Belt in Western Australia. This belt currently produces ~100koz pa at an AISC of ±A$2,800/oz from three mines at Plutonic Main, Plutonic East and Keillor. Catalyst is currently bringing three new mines into production - Trident UG, Cinnamon & Old Highway. Each will be processed through the existing, underutilised and centrally located 2Mtpa CIL processing plant. Exploration is targeting down dip extensions of each of these deposits. With the development and exploration of these five deposits, Catalyst aims to increase Reserves and production from 1.5Moz to ±2Moz and ±100koz to ±200koz annually. In so doing, Catalyst is aiming for Plutonic to have a 10 year mine life - a unique and rare proposition for an underground Western Australian gold mine. Catalyst also controls a processing plant and +75km of strike length immediately north of the historic +22Moz Bendigo goldfield. Here, Catalyst has delineated a high-grade, greenfield resource at 26 g/t Au. Further discoveries along strike are expected. Capital Structure Shares o/s: 261m Options: 0.5m Rights: 12.2m Cash & Bullion: A$331m Debt: Nil Reserve and Resource1,2 MRE: 4.5Moz at 3.3g/t Au ORE: 1.5Moz at 2.6g/t Au Corporate Details
Cinnamon Resource grows 370% underpinning maiden underground Reserve and 7-year LOM at up to 40-50koz pa Further Reserve growth potential from infill drilling of Inferred Resource and ongoing exploration success • Cinnamon’s Resource is 6.9Mt at 2.5g/t for 541koz – a 370% increase • This includes an Open Pit and Underground Resource of 2.9Mt at 1.2g/t for 108koz and 4Mt at 3.4g/t for 434koz, respectively • Within the Underground Resource, is a maiden Underground Reserve of 232koz at 3.0g/t underpinning a life of mine production target with a 7.5 year mine life, reaching steady state annual production of 40-50koz (see Figure 2) • Life of mine AISC are estimated at A$2,357/oz • Cinnamon’s wide, continuous mineralisation and favourable ground conditions lay the foundations for lower risk, more efficient bulk scale mining • Cinnamon is the sixth ore source on the Plutonic Belt in Catalyst’s plan to increase production to ±200koz pa – these ample ore sources will reduce Plutonic’s overall operating risk • The high-grade Cinnamon shoot is hosted in one of several repeating conglomerate units. Recent drilling intersected mineralisation in a number of these units demonstrating potential for repeat mineralised zones • To date, drilling has focussed on infill to delineate a Reserve. Future drilling programs will target these repeat units and seek to grow the deposit • In September 2025, Catalyst released general 10-year guidance3. Since then, Catalyst has seen changes to permitting timelines, operational delays and processing capability. It has also seen increases to Reserves and Resources at Cinnamon, Keillor and Trident. Reserves are now in excess of the previously reported 1.5Moz • As a consequence, the September 2025 guidance should be seen as a general guide as to management’s long-term plans for Plutonic Cautionary Statement: The Cinnamon life of mine Production Target contains approximately 74% of Ore Reserves and 26% Inferred Mineral Resource. There is a low level of geological confidence associated with Inferred Mineral Resource and there is no certainty that further exploration work will result in the conversion to Indicated Mineral Resource or that the Production Target itself will be realised.
Catalyst Metals Limited (Catalyst or the Company) (ASX:CYL) is pleased to announce an updated Mineral Resource and Ore Reserve for the Cinnamon deposit, located on the Plutonic Gold Belt in Western Australia. This includes a maiden Resource and Reserve for the recently discovered underground zone.
ASX: CYL E:investors@catalystmetals. com.au W:catalystmetals.com.au
Note 1: MRE includes Indicated Resources of 32.9Mt at 3.3g/t for 3.4Moz and Inferred Resources of 9Mt at 2.7g/t for 0.8Moz. ORE includes probable Reserves of 18.1Mt at 2.6g/t for 1.5Moz. Note 2: Refer to ASX announcement 14 October 2025 “Annual Report to shareholders Note 3: Refer to ASX announcement 10 September 2025 “Plutonic Belt Reserves double, supporting growth plans
The maiden underground Ore Reserve has been delivered within twelve months of initial discovery. Importantly, the Reserve establishes Cinnamon as the sixth ore source in Catalyst’s plan to grow Plutonic Gold Belt production to ±200koz per annum. Catalyst’s Managing Director & CEO, James Champion de Crespigny, commented: “To have moved from discovery to Reserve within 12 months is a credit to our team. The existing infrastructure and sunk capital across the belt makes this possible, however the team has turned it into a reality. Cinnamon will be a sixth ore source for the Plutonic mill. The width, and continuous nature of the orebody will lend itself to efficient mining of bulk stopes. Under our fellow Director Bruce Kay’s leadership, this has been a highly successful period of exploration for Catalyst. We have recently announced discoveries at Trident and Cinnamon and extensions at Keilor (formerly K2). Reserves, after depletion, have increased from 500koz to 1.5Moz and now beyond in only two years of exploration. His guidance, and now with the Company’s balance sheet, have ensured Catalyst’s long-term success.” Underground Mineral Resource and Ore Reserve In mid-2025 Catalyst commenced drilling at Cinnamon, targeting growth of the existing shallow open pit Resource and testing previously underexplored areas. In October 2025 that drilling discovered a wide, high-grade mineralised zone immediately beneath the existing Cinnamon open pit, approximately 200m below surface. Catalyst moved quickly to follow up this drilling and within 12 months of discovery, is pleased to present a maiden underground Resource and Reserve. An updated Resource and Reserve for the open pit is also presented further in this announcement. Table 1: Cinnamon Underground Ore Reserves Proved Deposit
Total
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
2.4
3.0
232
2.4
3.0
232
Underground
Probable
Numbers may not add up due to rounding Ore Reserves are based on a gold price of A$4,500/oz
Table 2: Cinnamon Underground Mineral Resources Measured Deposit Underground
Indicated
Inferred
Total
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
3.0
3.4
328
1.0
3.3
105
4.0
3.4
434
Underground life of mine The Reserve forms the basis of the Cinnamon underground mine plan, which has a 7.5 year life of mine and reaches steady state gold production of 40-50koz per annum.
The current life of mine plan contemplates underground development from the base of a future Cinnamon open pit. Upfront capital costs for the underground development are estimated at A$35m. The relatively low capital cost is reflective of the existing infrastructure and sunk capital across the Plutonic Gold Belt i.e. haul road, processing plant and camp infrastructure. Catalyst is evaluating alternative development scenarios, including a standalone box cut for access to the underground orebody. Cinnamon is a wide, continuous orebody. This allows large bulk stopes to be designed and mined, which delivers efficient mining conditions and potentially lower unit operating costs. Reserve stope widths average 25m, with wider areas up to 65m. Geotechnical studies indicate ground conditions will be favourable. Catalyst’s initial life of mine plan contemplates utilising paste fill allowing Catalyst to maximise extraction. Cinnamon ore will be transported via the existing haul road to the centrally located 2Mtpa Plutonic processing plant, 25km from the deposit. Metallurgical test work completed on Cinnamon mineralisation indicates gold recoveries of 90% for the underground and 92% for the open pit.
Figure 1: Cinnamon underground life of mine development
Table 3: Key metrics for Cinnamon underground life of mine Production Target Underground metrics
At A$4,500/oz
At A$6,000/oz
Pre-production capital1
$Am
35
35
Tonnes mined
Mt
3.3
3.3
Grade mined
g/t
3.0
3.0
Ounces mined
koz
315
315
Recovery
%
90%
90%
Ounces produced
koz
284
284
Life of mine (LOM)
yrs
7.5
7.5
AISC (life of mine)
A$/oz
2,357
2,395
Inferred Resource in LOM
%
26%
26%
Inferred Resource in payback period
%
1%
1%
Average UG production (steady state)
koz
48
48
Average annual free cash flow (steady state)
$Am
117
188
NPV7 (pre-tax)
$Am
408
726
IRR (pre-tax)
%
78%
126%
Note 1: The underground development metrics outlined assumes development commences at the base of the open pit and doesn’t include any metrics or costs for the development of the open pit Financial figures shown pre-tax due to Cinnamon being only one satellite deposit within Catalyst’s broader portfolio.
Cinnamon underground life of mine production (at A$4,500/oz) 60,000
4.5
Gold produced (koz)
50,000
$3.913oz
40,000 30,000
3.5 g/t
2.4 g/t
3.5
2.6 g/t $2.679oz
1.8 g/t
4.0
3.4 g/t
2.6 g/t
2.8 g/t
2.8 g/t
3.0
2.5
$2.573oz 2.0
$2.105oz 20,000
$2.093oz $1.634oz
1.5
$1.613oz
1.0
10,000 0.5
1
2
Gold produced (indicated) koz
3
4
5
Gold produced (inferred) koz
6 Grade (g/t Au)
Figure 2: Cinnamon underground life of mine production and grade
7
8 AISC (A$/oz)
Note: 76% of the life of mine Cinnamon Production Target is Indicated Resources and 24% Inferred Mineral Resource. There is a low level of geological confidence associated with Inferred Mineral Resource and there is no certainty that further exploration work will result in the conversion to Indicated Mineral Resource or that the Production Target itself will be realised. The Inferred Resource is not the determining factor in project viability and accounts for only 9% of the production target over the first 4 years and only 1% of the Inferred Resource included in the forecast pre-production cost payback. Approximately 65% of the total underground Inferred Resource has been incorporated into the life of mine production target. Historically, Catalyst has seen a conversion from Inferred to Indicated of around 75% through infill drilling and expects inferred material in the mine plan to have a reasonable prospect of conversion into indicated.
Open Pit Mineral Resource and Ore Reserve Updated Resources and Reserves for the Cinnamon open pit are shown below. Table 4: Cinnamon Ore Reserves Proved
Probable
Total
Deposit
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Open pit
2.0
1.4
88
2.0
1.4
88
Numbers may not add up due to rounding Ore Reserves are based on a gold price of A$4,500/oz
Table 5: Cinnamon Mineral Resources Measured
Indicated
Inferred
Total
Deposit
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Open pit
2.4
1.3
96
0.5
0.8
12
2.9
1.2
108
A sixth ore source in the 10-year plan Catalyst’s plan is to increase Plutonic’s gold production to ±200koz per annum. That production is to be sourced from six mines — Plutonic Main, Plutonic East, Keillor, Trident, Old Highway and Cinnamon. Based on the updated Ore Reserve, the Cinnamon Production Target assumes a 7.5 year mine life and is expected to deliver an average steady state production rate of 40-50koz per annum. The Cinnamon Production Target outlined in this announcement does not change the Company’s 10-year Plutonic Production Target of ±200koz per annum 1. Cinnamon has the potential to become a third base load ore source in Plutonic’s ±200koz plan, alongside Plutonic (Main and East) and Trident. These base load ore sources will be supplemented by meaningful, high-grade production from Keillor and Old Highway. Multiple ore sources allow stockpiles to be built ahead of the processing plant, creating greater flexibility, contingency and lowering the operating risk of the long-term plan. In September 2025, Catalyst released a 10-year production guidance. Since then, Catalyst has seen changes to permitting timelines, Reserves and Resources (Cinnamon being one such Resource), geological understanding, operational delays and processing capability. As a consequence, September 2025 should be seen as a general guide as to management’s long-term plans for the Plutonic Belt’s production. Future guidance will update for these new changes being observed.
1 Refer to ASX announcement 10 September 2025 “Plutonic Belt Reserves double, supporting growth plans
Growth potential — repeat conglomerate units The Cinnamon high-grade shoot is hosted in one of several repeating, stacked conglomerate units. Recent drilling has tested for mineralisation in these parallel and deeper repeating units, and a number of intercepts confirm mineralisation outside the current orebody, including 8m at 4.7g/t Au, 8m at 1.6g/t Au and 0.5m at 21g/t Au 2. Currently, four areas have returned results supporting the hypothesis of repeat mineralisation — two above the current orebody and two below. These intercepts are not included in the Mineral Resource or Ore Reserve and indicate potential for further growth of the deposit. Follow-up drilling will be undertaken in the coming months, and deeper drilling will test additional conglomerate units at depth. Replicating a second high-grade shoot within these units would be a material change to the Cinnamon development plan.
Figure 3: Cinnamon cross section showing potential for repeat mineralisation in conglomerate units
2 ASX Announcement 2 September 2026 “Successful infill drilling at Cinnamon”
Figure 4: Drill intercepts demonstrating continuous high-grade mineralisation
Cinnamon Trend The Cinnamon trend is a +10km trend located 25km north-east of the underutilised Plutonic processing plant. Historical drilling along the trend is limited and has been focused on shallow drilling of only the Cinnamon and Cobalt deposits. Historic exploration and mining along the Plutonic Belt have focused almost entirely on the mine mafic host rock, home to the Plutonic Gold Mine and driver of all geological models to date. The Belt has, however, demonstrated gold mineralisation to be hosted in other rock types — Plutonic Main (Resource 2.2Moz at 3.5g/t 3; historic production of 7Moz) is hosted in the mafic, Trident (Resource 1.1Moz at 5.4g/t) is hosted in the ultramafic, and deposits on the Cinnamon trend are hosted in a sedimentary (conglomerate) sequence. This opens up alternative, new exploration horizons for Catalyst to target. The Cinnamon mineralisation appears to be controlled by a dominant shear running ~10km northeast of the Triple P deposit. This ~10km northeast running shear is cross-cut by smaller faults. These intersections within the attractive conglomerate host rock appear to be what hosts the highest concentrations of gold mineralisation and form the basis for future drill targeting. The dominant shear also appears to have multiple parallel shears within close proximity to it. These parallel shears are also cross-cut by the same faults. These two features offer attractive, parallel, future drill targets. At depth, replication of mineralisation appears possible. The geological conditions discussed above are not yet changing at depth — the conglomerate host rock exists alongside the dominant shears and crosscutting faults. Further drilling will test its extent and intensity. 3 Refer to ASX announcement 14 October 2025 “Annual Report to shareholders.
Material information summary as required under ASX Listing Rule 5.16 and 5.17. CINNAMON DEPOSIT, PLUTONIC GOLD BELT, WA The estimated Ore Reserves and Mineral Resources underpinning the Cinnamon Production Target have been prepared by a Competent Person in accordance with the JORC Code. Material Assumptions All material and economic assumptions, and forecast financial information related to the Cinnamon Production Target are outlined below: Mining The Cinnamon operations plan to use shared infrastructure with the Plutonic shared infrastructure located ~30 km to the south-west. Shared infrastructure includes the Plutonic processing facility, administration, travel and accommodation services. The underground mine design, schedule and costings are representative of a typical Western Australian underground mine. Longhole stoping with paste fill was selected as the preferred mining method at Cinnamon. This is a well-understood mechanised mining method used in mining operations globally. It is proposed that longhole stoping with paste fill will use longitudinal extraction with multiple stopes taken in panels along strike. The proposed mining sequence will be a combination of bottom-up and top-down extraction. Mining costs have been based on actual mining costs at Plutonic mining operations, recent purchase history, and contractor pricing for other aspects that are not currently used in mining at Plutonic operation such as the application of paste fill. Production rates, fleet requirements, manning levels, and mining costs are based on a combination of inputs from first principles calculations, industry experience, and the existing Plutonic operation. Mining operations were assumed to be owner-operator by Catalyst. Dedicated geological, hydrology, backfill and geotechnical studies have been completed and form key input parameters for the mine design, schedule and costings. The use of paste fill as a backfill method will allow more selectivity in extraction, higher extraction ratio which can be regulated with the paste fill cement content, as well as flexibility in extraction sequence, allowing multiple mining fronts to achieve higher production rates. Processing Metallurgical test work of the Project has been undertaken on the Cinnamon open pit and underground orebody. This test work focused on gravity and cyanidation recovery. Test work has been conducted on RC and diamond drilled fresh ore composites, and transitional and oxide composites. The metallurgical test work is to a pre-feasibility study level and has been conducted to define the performance of the Cinnamon underground and open pit ore through the established Plutonic 2.0 Mtpa gravity/CIL plant. 92% metallurgical recovery has been applied in the open pit ore Reserve and 90% metallurgical recovery has been applied in the underground ore reserve.
Other Economic assumptions Catalyst plans to mine the underground component of the Cinnamon deposit on an owner-operator basis and the open pit component utilising a mining contractor. Given the similarities in operational framework between the existing Plutonic operations, Plutonic’s mining costs have been used as a basis of the mining cost estimate for Cinnamon underground whilst recent contractor pricing rates have been used as the cost basis for Cinnamon. Recent contractor pricing has been used where mining practices are not currently employed at Plutonic operations, such as the use of paste fill. Operating costs for the processing plant have been estimated using recent operating history and estimated physicals. Surface haulage will utilise a contractor and costs are based on current contractor pricing. Other operating costs including power and administration have been estimated using recent operating history. A$4,500/oz gold price, and a discount rate of 7% have been used in NPV modelling. Sensitivities have been conducted on gold price, costs, and metallurgical recovery with the project most sensitive to gold price. Royalties are based on existing royalties with the Western Australian government and third-party royalties. Cinnamon’s proximity to Plutonic allows many synergies, including the use of existing infrastructure, an existing employee pool, and systems and structures in place to run an underground mining operation. Environmental, social and other factors have been considered internally. Proportions of Ore Reserve and Inferred Resource underpinning the Production Target The Cinnamon life of mine Production Target contains approximately 74% of Ore Reserves in the Indicated Mineral Resource classification and 26% in the Inferred Mineral Resource classification. Please refer to Figure 2 for an annual breakdown of the composition of the Production Target. Cautionary Statement: There is a low level of geological confidence associated with Inferred Mineral Resource and there is no certainty that further exploration work will result in the conversion to Indicated Mineral Resource or that the Production Target itself will be realised.
Material information summary as required under ASX Listing Rule 5.9. ORE RESERVE ESTIMATES (Cinnamon) Material Assumptions and Outcomes All material and economic assumptions, and forecast financial information related to the Ore Reserve Estimate are outlined below: Level of Study The Cinnamon Ore Reserve Estimation is based on a pre-feasibility level study incorporating all material assumptions and modifying factors relevant to the planned mining and processing of Cinnamon open pit and underground operations. Further details on the material mining, processing and Ore Reserve Estimation methodology assumptions are outlined below. On the assumptions adopted, the Cinnamon open pit and underground mine plans are technically achievable and economically viable. Classification A ‘Probable Ore Reserve’ is the economically minable portion of an Indicated Mineral Resource. The Ore Reserve classification reflects the Competent Person’s view of the deposit. Only Probable reserves have been declared and are based on Indicated Resources following consideration of modifying factors. No probable Ore Reserves are derived from Measured Resources, as there was no Measured Resource within the MRE. There is a high level of confidence in the modifying factors applied because they are based on ‘actual’ operating performance currently being achieved at the nearby Plutonic mine. Mining Method Longhole stoping with paste fill is the preferred underground mining method at Cinnamon. This is a well understood mechanised mining method used in mining operations globally. The proposed stoping sequence is longitudinal extraction with multiple production fronts and a combination of bottom-up and top-down extraction. The use of paste fill as a backfill method allows greater selectivity and flexibility in extraction, higher extraction ratio than open stoping, and multiple mining fronts to achieve higher production rates. Open pit mining methods are based on the use of conventional open pit truck and shovel methods using 200t excavators and 90t haul trucks. Load-and haul, drilling and blasting will be performed by mining contractors. Ore haulage to the Plutonic mill will be undertaken by a road-train contractor. All relevant hydrological, geological and geotechnical parameters have been considered and applied in the open pit and underground mine designs and schedules. Processing Pre-feasibility level metallurgical test work of the Project has been undertaken. This test work focused on gravity and cyanidation recovery. Test work has been conducted on RC and diamond drill fresh ore composites, and transitional and oxide composites.
The aim of the test program was to define the performance of the Cinnamon underground and open pit ore through the established and currently operating Plutonic 2.0 Mtpa gravity/CIL plant. Test work has indicated that Cinnamon open pit and underground ore are amenable to the existing Plutonic processing methods. Open pit metallurgical recovery of 92% and underground metallurgical recovery of 90% have been adopted and are supported by the test work. Concentrations of deleterious elements have been noted as low across the different material types including fresh, transitional and weathered ore. Cut-off Grade The cut-off grade applied to the Ore Reserve Estimate is defined as the $A value per tonne of ore after consideration of all costs (mining, processing, Site administration), metallurgical recoveries, sustaining capital, transport costs and royalties. Underground cut-off grades are based on an incremental stope cut-off grade of 1.6g/t and assessed within the mining schedule scenario to determine they are economic. A development ore cut-off grade of 1.0 g/t has been utilised. An open pit cut-off grade of 0.6 g/t has been calculated and applied in the open pit design and schedule. Estimation Methodology The underground Ore Reserve estimate is reported within Deswik’s Stope Optimiser (DSO) evaluation from the mineral resource estimate model (MRE). DSO input parameters include a 1.6 g/t Au cut-off, minimum mining width of 2.5m and 0.5m of dilution added to both the footwall and hanging wall. Additional 5% dilution was applied to all paste filled stopes. A minimum stope length of 10m, stope height of 20m and a gold price of AUD$4,500/oz have been used as design inputs. Development had no dilution applied and 100% mining recovery was assumed. A mining recovery of 92.5% was applied. This factor allows for bogging losses typically realised in longhole stoping. In the open pit Ore Reserve representative dig blocks were generated to determine appropriate dilution and ore loss figures. Dilution factors of 17% in oxide, 19% in transitional and 21% in fresh material have been applied in the open pit Ore Reserve A mining recovery factor of 93%, or stated as a 7% ore loss allowance, has been applied in the open pit Ore Reserve. Any Unclassified or Inferred Mineral Resources have not been included in the underground or open pit Ore Reserves, however if the material is mined as a consequence to mining, then the material had a zero grade assigned and therefore treated as waste. Other Material Factors, Approvals and Infrastructure Activities undertaken onsite are undertaken in accordance with the environmental approvals. Monitoring programs are conducted to ensure that key approval licence requirements are complied with. Mining tenements and approvals are in good standing. The Company has demonstrated a strong environmental and social performance; there are no identified threats that place the company’s social licence to operate at risk.
Other key infrastructure that is required for the underground mining operation includes power generation and reticulation, primary ventilation infrastructure, office buildings, maintenance workshops, explosives magazines, water reticulation and storage, ore stockpiles and waste dumps, evaporation ponds and other facilities. All the stated infrastructure has been allowed for in both the open pit and underground costings. Proved Grade (g/t Au)
Gold (koz)
Total
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Open pit
2.0
1.4
88
2.0
1.4
88
Underground
2.4
3.0
232
2.4
3.0
232
Total
4.4
2.3
320
4.4
2.3
320
Cinnamon deposit
Tonnes (Mt)
Probable
Notes: 1. 2.
Numbers may not add up due to rounding Ore Reserves are based on a gold price of A$4,500/oz
Material information summary as required under ASX Listing Rule 5.8 and JORC Code (2012) reporting guidelines. Mineral Resource Statement The Mineral Resource Statement for the Cinnamon Underground and Open Pit Mineral Resource estimate has been prepared during August 2026 and is reported according to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Code’) 2012 edition. The Mineral Resource Estimate incorporates all drilling data completed by Catalyst since the previous MRE (June 2025) to the current data cut-off date of 26 August 2026. A total of 88,639 m of drilling from 181 diamond and diamond tails, and 147 RC holes have been completed by Catalyst and form the basis of this Mineral Resource update. The previous MRE was based solely on historical drilling that was available as of 6 May 2024. Cinnamon’s total Resource of 6.9Mt at 2.5g/t for 541koz is a 370% increase from the previous reported Resource of 3.0Mt for 145koz. The current vertical extent of the Cinnamon Underground Mineral Resource is approximately 450m (to 180mRL) from the current topographic surface. In the opinion of Catalyst, the resource evaluation reported herein is a reasonable representation of the global gold Mineral Resources within the Cinnamon deposit, based on sampling data from RC, RCD, and DD drilling available as of 26 August 2026. The Cinnamon Mineral Resource (MRE) has been undertaken with a focus on delineating areas of the MRE with Reasonable Prospects for Eventual Economic Extraction (RPEEE) by open pit and underground mining methods. The underground component of the MRE has been reported at a 1.5 g/t Au cut-off within fresh rock only to a maximum vertical depth of 450m below the topographic surface. The open pit portion has been reported at a 0.5 g/t Au cut-off for oxide and transitional material only. The Cobalt deposit has been included within the Cinnamon MRE reporting. The total Cinnamon MRE consists of Indicated and Inferred Mineral Resources which are outlined in Table 1 below. No Measured Mineral Resources have been reported at this stage of the project.
Deposit
Reporting Cutoff
Indicated
Inferred
Total
Tonnes
Grade
Gold
Tonnes
Grade
Gold
Tonnes
Grade
Gold
(Mt)
(g/t Au)
(koz)
(Mt)
(g/t Au)
(koz)
(Mt)
(g/t Au)
(koz)
Underground
1.5
3.0
3.4
328
1.0
3.3
105
4.0
3.4
434
Open Pit
0.5
2.4
1.3
96
0.5
0.8
12
2.9
1.2
108
5.4
2.4
424
1.5
2.5
117
6.9
2.5
541
Total
Table 1 – Cinnamon MRE (Open Pit = 0.5 g/t Au cut-off, Underground = 1.5 g/t Au cut-off) Notes: 3. Underground Resource consists of Fresh material only, 4. Open Pit Resource consists of Oxide and Transitional material only 5. Numbers may not add up due to rounding
Regional and Local Geology The Cinnamon Deposit is part of the Plutonic Project located approximately 200km north-east of Meekatharra, WA, on the Three Rivers and Marymia Pastoral Leases, within the Peak Hill Mineral Field of WA (Figure 1). The Project is covered by the Peak Hill (SG 50-8) 1:250,000 Sheet and the Marymia (2847) and Three Rivers (2747) 1:100,000 sheets. Access to the Plutonic Gold Mine Camp is via the Great Northern Highway and the Plutonic Mine access road.
Figure 1 : Plutonic Regional Map Regionally, the Plutonic Gold Belt lies in the Archaean Plutonic Well Greenstone Belt, an elongate NE trending belt within the Marymia Inlier. The Marymia Inlier is an Archaean basement remnant within the Proterozoic Capricorn Orogen and comprises two mineralised greenstone belts (Plutonic Well and Baumgarten Greenstone Belts), with surrounding granite and gneissic complexes. The Capricorn Orogen is situated between the Pilbara and Yilgarn cratons and is interpreted to be the result of the oblique collision of these two Archaean cratons in the early Proterozoic. The Marymia Greenstone Belt comprises two corridors of northeast–southwest trending mafic/ultramafic and sedimentary sequences separated by a conglomerate-dominated sedimentary sequence.
Three major structural events are interpreted to have shaped the belt, including D1 low-angle thrusting and isoclinal folding that has emplaced mafic and ultramafic units structurally above the sedimentary units in the northwest side of the belt (the overthrust terrane), followed by southeast directed upright D2 folding and faulting, granite/porphyry sheet intrusion then D3 high-angle thrusting, open folding of earlier structures plus reactivation of the D1 and D2 thrusts. Cinnamon is a structurally controlled, orogenic, mesothermal (amphibolite metamorphic facies) style gold deposit, which is associated with the late tectonic D3 high-angle thrusting event and open folding and dilation of the earlier thrusts. The deposit is hosted within the central conglomerate domain of the Marymia Greenstone Belt. Mineralisation is associated with shearing within the chlorite-biotite altered matrix of the conglomerate unit. The conglomerate mostly consists of granodioritic clasts with a mafic derived matrix. Minor quartz veining/silicification and sulphides (pyrrhotite, chalcopyrite) has been observed in the foliated/sheared chlorite-biotite altered matrix. The gold mineralisation is hosted within discreet conglomerate units which are bounded and transected by shear zones. The higher grade mineralisation is located in flexures of the shear zones hosted by specific clast supported conglomerates and is focussed within the fractured felsic clasts by sulphidic veinlets.
Geological Interpretation A total of 88,639 m of drilling from 181 diamond and diamond tails, and 147 RC holes have been completed by Catalyst since the previous MRE and form the basis of this Mineral Resource update (Figure 2). The Cinnamon to Cobalt mineralised corridor is approximately 2,400 m long, 200 m wide, and extends up to 450 m down dip to 180 mRL. The mineralised domains strike northeast–southwest and are moderately northwest dipping at 60˚ to 75˚. Resource infill drilling on a nominal 25m grid spacing was focussed on the high-grade shoot to confirm both geological and grade continuity along the main mineralised trend. This spacing was considered adequate to establish both geological and grade continuity and allow conversion of a large part of the Inferred MRE to the Indicated category. Mineralisation has been interpreted as moderate to high-grade subparallel shoots of gold within upper and lower flexures that dip moderately to the northwest in the oxide/transitional zones, and steeply in the primary/fresh zone. Mineralisation domains have been interpreted primarily using geological logging and the location downhole of geological contacts, based on lithology, grade distribution, major faults and geometry. Weathering surfaces have been created by interpreting the existing logging for oxidation state and have been extended laterally beyond the limits of the Mineral Resource block model. Interpretation of the mineralisation has been undertaken in Seequent Leapfrog Geo™ software using all available drillholes. Intercepts correlating to gold mineralisation and underpinned by strike continuity have been independently identified and manually selected within Seequent Leapfrog Geo™ prior to creation of implicit volume models.
A nominal cut-off grade of 0.2g/t Au, and a minimum downhole length of 2m was used to guide the geological continuity of the interpreted mineralisation lodes. Selection of the cut-off grade was based on statistical and spatial analysis of composite data indicating a natural mineralisation population exists above 0.2 g/t Au. Within the mineralised wireframe, if an intercept fell below the nominal cut-off but continuity was supported by host lithologies and mineralisation style, the intercept was retained for continuity purposes due to the commodity and the style of deposit. The geological model is comprised of a total of 22 estimation domains grouped into two main areas of Cinnamon (17 domains) and Cobalt (5 domains). The high-grade Cinnamon shoot (domain 4001) is hosted in one of several repeating and stacked conglomerate units and has been delineated along a 700m mineralised strike length. Mineralised domains can vary in thickness from approximately 0.6 m and up to 45 m in the high-grade domain (4001). CYL considers confidence in mineralisation continuity and distribution, as implied within the Mineral Resource estimate classification of Indicated and Inferred, as moderate to high. The regularised drill pattern, drill centre spacing (varying from 25m to 100m) has allowed confident interpretation of the geometry and continuity of the higher-grade mineralised zones informing these Mineral Resources (Figure 3, Figure 4 and Figure 5).
Figure 2 : Cinnamon Plan View – Drilling Type and Mineralisation Domains
Figure 3 : Cinnamon Long Section A-A’
Figure 4 : Cinnamon Cross Section B-B
Figure 5 : Cinnamon Representative Geological Cross Section with Resource Extension Drill Targets
Sampling and Sub-Sampling Techniques Catalyst has undertaken both surface RC and DD drilling at the Cinnamon deposit since acquiring the project. RC samples were collected for each metre drilled and passed through a cyclone and cone splitter to produce a 2 kg to 4 kg sample for assay into calico bags. Depending on the oxidation state of the rock, the sample weight varied between three and five kilograms. The RC drilling and sampling were supervised at the drill site by a company sampler and geologist. The cone splitter has double chutes for field duplicates with infinite adjustment between 4 – 15% per sample chute. The cyclone was cleaned using compressed air after every sample and the cyclone was cleaned every 40m, or more regularly at the geologists' discretion. Most of the RC samples were despatched to the Intertek (ITK) laboratory in Perth for gold fire assay analysis until February 2026, after which they were sent to SGS and BV. Occasional despatches were sent to ALS and Plutonic site lab depending on laboratory availability. Half cut diamond core was sampled on 1m intervals or to geological contacts, with sample lengths varying between 0.1 m to 1.3 m. Whole core sampling was instigated for broken/sheared zones which could not be cut. This resolved any possible biasing issues with 1/2 core grab samples within these incompetent fractured and sheared zones. Surface DD core samples were sent to several labs, the majority to the Plutonic onsite lab (PAL_DIBK and FA40) and the remainder to ALS (Au-AA26).
Sample preparation and analytical methods for each lab are detailed below: Plutonic onsite lab by PAL method (PAL_DIBK): o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o A nominal 500g riffle split sample is used for PAL assaying for 1 hour leach cycle o PAL 1000 grind check ensures a minimum of 95% passing 75 μm sieve size. o Sample re-assay or duplicate samples are taken from the retained original crushed sample Plutonic onsite lab by Fire Assay method (FA40): o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o 1-1.5kg riffle split for pulverisation o Pulverise to 85% passing 75μm o Scoop 250-300g aliquot for lead collection Fire Assay 40g charge with AAS finish ALS laboratory: o Sample sorting and drying (DRY-21). o Core sample is coarse crushed (CRU-21), RC samples not crushed. o Pulverise entire sample to a particle size of 85% passing 75µm (PUL-24). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (Au-AA26). BV laboratory: o Sample sorting and drying (PR001). o Entire core sample is crushed to 10mm (PR102), RC samples not crushed. o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 90% passing 75µm (PR303). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (FA450). SGS laboratory: o Sample sorting and drying at 105°C (G_DRY_KG). o Entire core sample is crushed to a nominal 90% passing 2mm (G_CRU_KG). o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 85% passing 75µm (G_PUL). o 200g aliquot for lead collection Fire Assay 50g charge with AAS finish (GO_FAP50V10). ITK laboratory: o Sample sorting and drying at 105°C. o Entire sample is crushed to a nominal 90% passing 2mm (SPO3) o Riffle splitting to obtain between 1.5 to 3kg. o Pulverising to a particle size of 90% passing 75µm (SPO3). o 200g sample aliquot for lead collection by Fire Assay 25g and 50g charges with ICP-OES finish (FA25/OE02 and FA50/OE02).
A summary of samples collected by Catalyst and used for the resource estimate are below in Table 2. Drill Type Cinnamon RC DD Cobalt
TOTAL
RC DD RC DD
ALS FA50 6,171 5,622 549 2,523 2,523 8,694 8,145 549
BV ITK FA50 FA25/FA50 1,142 24,322 1,016 24,322 126 6,090 6,090 1,142 30,412 1,016 30,412 126
PLUTONIC FA40 PAL 2,973 31,848 405 2,568 31,848 141 1,418 141 1,418 3,114 33,266 405 2,709 33,266
SGS FA50 4,064 3,573 491 2,298 2,186 112 6,362 5,759 603
Total 70,520 34,938 35,582 12,470 10,799 1,671 82,990 45,737 37,253
Table 2 – Summary of Catalyst sample types
Quality Assurance and Quality Control (QAQC) samples are included in each sample batch and are dispatched to the assaying laboratory to measure the accuracy and precision of the returned assays. QAQC samples inserted into the sample stream include: •
• • •
Certified Reference Material (CRM) were submitted at an average rate of 4% of the total samples. CRMs are of similar grade tenor to the grades to be expected from sampling of the deposit. They were selected based on their grade range and mineralogical properties with an emphasis on sulphide ores. Coarse 40mm blanks were inserted at an average rate of 3% of the total samples RC field duplicates were inserted at an average rate of 2% of the total samples A mix of field duplicates (1/4 core) and coarse crush duplicates were inserted in the DD drilling, at an average rate of 1% of the total primary samples.
Quality control samples were inserted at an average rate of 10% of the total samples. Crush sizing analysis is conducted randomly by the commercial laboratories as part of their QC process. Pulp residues are expected to have 90% passing ≤75μm. This data is monitored by the Laboratory Supervisor. Grind times can be lengthened accordingly. Current procedures dictate a process of validation and checking of laboratory results when the assay data is returned by the laboratory upon loading into the independently managed Quest database. A routine set of plots and checks are undertaken, and if results fall outside of the expected limits, re-assaying of failing samples is requested. QAQC reports are generated by the database administrator and documented from automated database routines. The sample preparation protocols and sample sizes are considered appropriate for the style of mineralisation encountered and should provide representative results.
Historical Sampling Vango (2014 to 2023) Vango RC drilling assays were collected as 1m samples split on the cyclone, using a cone splitter. Each RC sample weighed approximately 3 to 5kg. Four metre composites were collected from 4 of the 1m samples within the cover sequence and overlying granite. Vango diamond drilling samples were mostly half core of NQ2 and HQ size, with minor quarter core samples. This is considered to be sufficient material for a representative sample. Core samples were taken at 1m intervals or at geological boundaries, ranging between 0.8 to 1.25m in length. The DD drillholes were geologically logged to geological boundaries in addition to being structurally and geotechnically logged. Recovery in DD was based on the measured core returned for each 3m run. RC drilling was bagged on 1m intervals and an estimate of sample recovery made based on the size of each sample. QAQC protocols included the collection and analysis of field duplicates, the insertion of appropriate commercial standards (CRMs) and the insertion of blanks. Matrix and grade matched CRMs were submitted every 20 samples. Blanks were inserted every 20 samples. Pre-Vango (1995 – 2014) Sampling procedures earlier than 2018 are not available. Historical RC samples were collected as 4m composite spear samples. Mineralised zones were sampled at 1m intervals using a 1/8 riffle splitter. Core samples were halved using a diamond saw and sampled at 1m intervals, or to geological contacts. RC field duplicate sampling was completed by passing the bulk reject sample from the plastic bag through a riffle splitter. DD field duplicates were collected as quarter core samples and routinely submitted. Duplicate sample intervals were designated by the logging geologist. No assessment of RC chip sample recoveries was undertaken on historical data however a comprehensive historical review of sampling procedures had been undertaken which indicates that standard procedures where enacted to ensure minimal sample loss. Where information on the recoveries had been recorded, they have been found to be consistent with those noted by subsequent drilling. Recovery in diamond drilling based on measured core was returned for each 3m run. Sample Analysis Methods The Pulverising and Leach (PAL) method utilised at the Plutonic onsite lab is not considered to be a total gold analysis, however the larger sample size (500g) still produced a representative and comparable result. The majority of the samples used the fire assay (50g) technique by AAS method which is considered to be a total gold analysis. For the historical drilling, gold was analysed using fire assay with a 25g to 50g charge for gold. Specific QAQC procedures for previous owners were unavailable.
Although sample collection, sample preparation, sample logging and analytical techniques have varied over the Project’s history, all can be considered as industry standard at the time of drilling. The amount of QAQC data that has been collected has also varied over the Project’s history, however, overall is considered as being acceptable to support the MRE.
Drilling Techniques The Quest drill hole database, managed by EarthSQL, has been compiled from information collected when the Project was under ownership of numerous companies including: • • • • • • • •
Catalyst Metals (2023 to current) Vango (2013 to 2023) Dampier Gold (2012 to 2014) Barrick Gold (2001 to 2012) Homestake (1999 to 2001) Resolute (1995 to 1998) Battle Mountain Australia Inc. (Pre 1994) Inco (1969-1971 and 1972-1976)
Catalyst consolidated the belt in 2023 following the successful acquisition of Vango Mining and the merger with Superior Gold Inc. All Catalyst drilling data used in this Mineral Resource Estimate has been sourced from surface Diamond core drilling (DD) and Reverse Circulation (RC) drilling methods. All reported coordinates are referenced to grid system MGA_GDA94 Zone 50 and the topography is relatively flat within the drilling areas. RC drilling has been conducted utilizing a 5.75” face sampling bit. Surface Diamond core drilling utilises NQ core with a diameter of 47.6 mm. Catalyst drillholes have been routinely pegged using a Differential Global Positioning System (DGPS) handheld unit and marked with wooden pegs. Once completed, the collar position has been re-surveyed using the same DGPS unit to an accuracy of +/- 20mm. The surveyed co-ordinates replace the planned co-ordinates in the database. Downhole survey data was collected using an Axis Mining Technology Champ North Seeking Gyro tool. Surveys are undertaken on 10m intervals as the tool is removed from the drillholes once the drillhole is completed. All DD core is orientated using a Reflex ACT device and detailed structural measurements and logging is carried out. Historical Drilling Extensive previous work was completed by Resolute Mining, Homestake Gold, Battle Mountain Australia, Barrick Mining and Dampier Gold. Previous metallurgical and resource work was completed by Resolute Mining, Barrick Mining and Dampier Gold.
The quality of historical drilling information is varied, but all the above companies used high quality methodology at the time. The collar locations of historic drillholes were validated from geological logging information from annual reports and the original database when Vango acquired the tenure. All reported coordinates were referenced to grid system MGA_GDA94 Zone 50. The survey station network met the Mine Safety and Inspection Regulations 1995, section 3.49, where the accuracy of a survey must be not less than 1:5000. Vango (2014 to 2023) Planned drillhole collars were pegged with a DGPS and marked with wooden pegs hammered into the ground and flagged with high visibility flagging tape. On completion of drilling, the actual drillhole collar position was measured by survey staff using a DGPS working off a network control of survey stations, to an accuracy of 20mm. These surveyed coordinates replaced the planned coordinates in the geological database. Recent (2023) downhole survey data was collected by Westdrill using an Axis Mining Technology Champ North Seeking Gyro tool. Surveys were conducted at end-of-hole (EOH) using a north-seeking gyroscope with a reading collected every 5m. If early drilling found strong drillhole deviation, surveys were conducted during drilling (collar, 30m, 60m, 90m etc to EOH). Survey deviation was monitored by the geologist onsite, with major deviation discussed with the driller at the time. Recent Vango RC drilling was conducted utilizing 5.75” face sampling bit. Diamond drilling was conducted utilising NQ2 core. Core was orientated by downhole spear methodology. Pre-Vango (1995 – 2014) Previous downhole survey data was collected using a REFLEX gyro tool and historically with Eastman camera survey tools, with follow-up downhole surveys carried out by Surtron using gyroscopic survey equipment. Historical downhole surveys were reviewed and verified where information was available through direct comparison within the database. Historical Diamond drillholes utilised PQ3, HQ3 or NQ2 core diameter, while RC drilling utilised a 5.5” drill bit. Estimation Methodology All geological domains used in the Cinnamon MRE have been constructed in Leapfrog software. Block modelling and grade interpolation have been carried out using Surpac software. Statistical analysis has been completed using Supervisor software. Block model constraints have been created by applying the interpreted mineralised domain wireframes. Sub-celling in all domains has been set at 1.25m x 1.25m x 1.25m to accurately reflect the volumes of the interpreted wireframes. All drillhole assay samples have been uniquely flagged according to the mineralisation domains. All drillholes are composited to 1m downhole using a best-fit methodology and 0.5m minimum threshold on inclusions. A small number of residual composites have been retained for use in the estimation.
The geological model is comprised of a total of 22 estimation domains grouped into two main areas of Cinnamon and Cobalt as outlined below in Table 3, and shown in Figure 2 and Figure 6. Area
Cinnamon
Cobalt
Domain 1000 1010 1100 1500 2000 3000 3001 3500 4000 4001 4500 5000 8010 8020 8030 8098 8099 6095 6097 6098 6096 6099
Description Hanging Wall Lode Hanging Wall Zone 1 Hanging Wall Zone 2 Minor Zone Minor Zone Minor Zone Ginger Shoot Minor Zone Minor Zone High Grade Shoot Footwall Lode Footwall Lode Supergene Zone Supergene Zone Supergene Zone Cinnamon SW Cinnamon SW Supergene Zone Supergene Zone Supergene Zone Footwall Lode Central Zone
Table 3 – Cinnamon Estimation Domains
Figure 6 : Cinnamon Main Estimation Domains and Resource Extension Drill Targets – Isometric view looking east
The distribution of gold grades within the mineralised lenses is highly variable and is characterised by distinct cohesive regions of higher tenor gold grades. Whilst these higher-grade zones appear reasonably cohesive, they are manifested by a high-degree of short-scale variability, making it difficult to manually interpret constraining domains. These internal; high-grade regions are often surrounded by peripheral regions of lower grade mineralisation that are also highly variable. Raw Coefficients of Variation (CoV) vary from 1.5 to 3.1, indicating moderate to high grade variability. A traditional approach of physical domaining, assay cutting, and linear estimation (IDW or OK) is considered inadequate in dealing with this complexity. The estimation method implemented combines Categorical Indicator Kriging (CIK) to define broad estimation domains, together with applying distance limiting at chosen grade thresholds to restrict the influence of the high-grade values during grade interpolation. The CIK methodology has been utilised for the estimation of all 22 domains. Prior to estimation, a reference surface for each estimation domain was exported from Leapfrog. This is calculated as the best fit surface using the hanging wall and footwall surfaces. The reference surface was imported into Surpac and a dip and dip-direction value of each triangle facet was calculated. These orientations are then imported into the Surpac block model to provide information for dynamic search and variogram model orientation during interpolation. Dynamic estimation has been applied for estimating the CIK indicators and gold grades. Categorical Indicator Kriging Workflow The estimation method applied to the CIK domains utilises a probabilistic method to define internal estimation sub-domains, together with applying distance limiting at chosen grade thresholds, to restrict the influence of the high grade and extreme grade values during the grade estimation. Two Categorical Indicator values are determined for the CIK domains: A low-grade (LG) indicator assigned to differentiate between background ‘waste’ and lowtenor mineralisation. • A high-grade (HG) indicator assigned to define broad areas of consistent higher-tenor mineralisation. Variograms were generated for the LG and HG indicators for Domains 1000, 4001 (High Grade Shoot), and 6099. The variogram and estimation parameters for these key domains were then applied to the other domains in the respective groups as detailed below in Table 4. •
Area Cinnamon Cobalt
Domains
Applied Parameters
4001
4001
All other domains
1000
All domains
6099
Table 4 – Cinnamon Variogram and Estimation Parameters Groupings The CIK indicators have been estimated using OK into a finely gridded block model with block dimensions of 1.25m x 1.25m x 1.25m. The small block size for the indicator process is beneficial for creating categorical sub-domains at a resolution which can be used to accurately back-flag composite data.
Three categorical sub-domains have been generated: low-grade (LG), medium-grade (MG) and high-grade (HG) areas. The HG sub-domain has been based on an indicator probability threshold of 0.35 and the LG sub-domain has been based on an indicator probability threshold of 0.65. The MG sub-domain is assigned to blocks that do not satisfy either the HG or LG sub-domain criteria. The three categorical block model sub-domains (HG, MG and LG) have been used to ‘back-flag’ the 1m composites, creating a separate composite file for each sub-domain. The assay top-cuts have been applied to the sub-domain composite files. The top-cuts are generally above the 99th percentile of the distribution and have been aimed at globally limiting extreme values only. In this estimation methodology, top-cuts are not used as the primary tool to control metal risk. The use of grade thresholds and distance limiting is considered a more objective and influential method in controlling metal risk, while better reflecting the actual localised occurrence of discontinuous high-grade gold mineralisation. Grade thresholds for distance limiting have been determined from log-probability plots and detailed review of the spatial locations of the gold grades. The indicator cut-offs, assay top cuts and grade distance limiting thresholds for each domain are summarised below in Table 5: Area Group
Domain Code
Cinnamon Hanging Wall Lodes
1000, 1010, 1100 1500
Minor Lodes
2000 3000
Ginger Shoot
3001 3500
Minor Lodes 4000 High Grade Shoot
4001 4500
Footwall Lodes 5000 8010
Indicator
Indicator Cut-offs (Au g/t)
Assay Top Cut (Au g/t)
Grade Threshold (Au g/t)
Distance (metres)
LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG
0.2 1 0.15 1 0.25 1 0.15 1.2 0.5 1.8 0.15 1 0.2 1.2 0.15 1 0.15 1 0.25 1 0.15
1 8 30 9999 4 20 0.5 4 18 1 3 8 0.2 8 12 9999 0.8 15 1 15 16 0.18 1.1 80 0.3 1.5 8 0.3 1.5 8 0.6
0.25 5 18 0.1 1 12 0.25 2 10 0.15 1.5 6 0.1 2 9 0.15 0.6 7 0.2 3 10 0.12 0.9 25 0.2 1 6 0.2 1 6 0.2
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 15 15 15 20 20 20 20 20 20 20
Area Group
Supergene Zones
Domain Code
8020 8030 8098
Cinnamon SW 8099
Indicator MG HG LG MG HG LG MG HG LG MG HG LG MG HG
Indicator Cut-offs (Au g/t) 0.8 0.15 1.2 0.2 1.2 0.15 1 0.15 0.8
Assay Top Cut (Au g/t) 2 6 0.6 2 6 9999 4 20 0.1 1 6 0.1 1 6
Grade Threshold (Au g/t) 1 4 0.2 1 4 0.15 1.2 8 0.1 1 4 0.1 1 4
Distance (metres) 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Table 5 - Cinnamon Estimation Indicators Prior to grade estimation, sub-domain codes from the 1.25m resolution block model have been imported into a 2.5m x 2.5m x 2.5m resolution block model and the proportion of LG, MG and HG is calculated for each 2.5m block. The choice of a 2.5m x 2.5m x 2.5m block size reflects the likely mining selectivity achievable for both open pit and underground mining scenarios. Grade estimation for the LG, MG and HG domains has been undertaken in Surpac software using OK with grade threshold distance limiting applied by domain. Search ellipse orientation and variogram orientations are drawn from the pre-populated dynamic anisotropy information recorded in each block. Final block grades at a 2.5m x 2.5m x 2.5m block resolution have been calculated by weighting the estimated grades for each sub-domain by the relevant domain proportion. The parent estimation block size is 2.5m x 2.5m x 2.5m. A single-pass estimation strategy has been used across all domains, whereby a search range of 100m by 100m by 40m and minimum 2 to maximum 12 composites has been utilised to estimate a grade. It is possible that up to 36 composites can be used to estimate a parent block where there is a proportion of all three sub-domains present. Octant restrictions have not been used. Block model validation was completed to check that the grade estimates within the block model are an appropriate reflection of the underlying composite sample data, and to confirm that the interpolation parameters have been applied as intended. Checks of the estimated block grade with the corresponding composite dataset have been completed using several approaches involving both numerical and spatial aspects as follows: • Semi-Local: Using swath plots in X, Y and Z directions comparing the estimates to the sample data. • Local: Visual inspection of the estimated block grades viewed in conjunction with the sample data. No selective mining units were assumed in the resource estimate. Only Au grade was estimated. The final grade model for the three main domains (1000, 3001, and 4001) in relation to the informing drill pierce points are shown in Figure 7.
Figure 7 : Grade Model of the Main Estimation Domains, with Informing Composited Drill Intercepts – oblique view looking north
Bulk Density Density has been assigned to the resource using interpreted weathering surfaces determined from drillhole logging using water immersion density measurements from the diamond drill core. The following densities were coded into the Surpac model using the weathering domains generated in Leapfrog software: • • •
Oxide =1.8 Transitional=2.4 Fresh=2.7
Classification Criteria Mineral Resources were classified as Indicated and Inferred to appropriately represent confidence and risk with respect to data quality, drillhole spacing, geological and grade continuity and mineralisation volumes. Additional considerations were the stage of project assessment, amount of DD and RC drilling undertaken, current understanding of mineralisation controls and mining selectivity within the mining environment. The drilling, surveying and sampling undertaken, and analytical methods and quality controls used, are appropriate for the style of deposit under consideration.
Indicated Mineral Resources were defined where a moderate level of geological confidence in geometry, continuity and grade was demonstrated, and were identified as areas where: •
The portions of the Cinnamon MRE classified as Indicated have been flagged in areas of the block model where the average distance to the nearest informing composited drill intercept was nominally 30m or closer.
•
Blocks were interpolated with a neighbourhood largely informed by the maximum number of samples.
Inferred Mineral Resources were defined where a low to moderate level of geological confidence in geometry, continuity and grade was demonstrated, and were identified as areas where: •
The portions of the MRE classified as Inferred typically represent minor lodes or lower grade portions of the larger domains where geological continuity is present but not consistently confirmed by 30m spaced composited drill data.
•
The Inferred Resources were interpolated where the average distance to the nearest composited drill intercept was nominally 80m or closer. The extrapolation of the resource was limited to a maximum of 80m past the last sample point.
Further considerations of resource classification include; •
data type and quality
•
drilling type
•
drilling orientations
•
down hole surveys
•
sampling, and
•
assaying methods, and
•
geological confidence and geostatistical considerations.
Mineralisation within the block model which did not satisfy the criteria for classification as Mineral Resources remained unclassified. The delineation of Indicated and Inferred Mineral Resources appropriately reflects the Competent Person’s view on continuity and risk at the deposit and is shown in Figure 8.
Figure 8 : Main Domains – Cinnamon MRE classification with Informing Composited Drill Intercepts – oblique view looking north
Cut-off Grade The Underground component of the MRE has been reported at a 1.5 g/t Au cut-off for fresh material only. The cut-off grade has been derived from current mining and processing costs and metallurgical parameters used for the operating Keillor Underground mine and at the nearby Plutonic Underground Mine. The Open Pit portion has been reported at a 0.5 g/t Au for oxide and transitional material only. The cutoff grade was derived from recent mining and processing costs and metallurgical parameters used at the recently completed Trident West Open Pit.
Assessment of Reasonable Prospects for Eventual Economic Extraction The Cinnamon Mineral Resource has been undertaken with a focus on delineating areas of the MRE with Reasonable Prospects for Eventual Economic Extraction (RPEEE) by open pit and underground mining methods. The following criteria were considered in determining the RPEEE: • • •
Deposit scale Geometry, in particular mineralisation true width and minimum mining width Proximity to ground surface
• • •
Established ORE/existing mine plan for material above the Underground Resource Access to existing critical infrastructure Current gold price
The Underground MRE has been reported at a 1.5 g/t Au and constrained to fresh material only to a maximum vertical depth of 450m below the topographic surface. Underground mining selectivity is assumed to include a minimum mining width of 1.5m, minimum stope length of 5m, and a minimum stope height of 5m. The Open Pit MRE has been reported at a 0.5 g/t Au and constrained to oxide and transitional material only. Mining selectivity is assumed to be on 2.5m vertical benches with a 5m x 5m Selective Mining Unit (SMU) The Mineral Resource is considered to have reasonable prospects for eventual economic extraction given the access to critical infrastructure, the volume and grade of mineralisation available for mining and the RPEEE criteria which have been applied prior to reporting the Mineral Resource. The grade-tonnage curve for the Cinnamon classified resource for all domains is shown in Figure 9.
Figure 9 : Cinnamon MRE August 2026 vs MRE June 2024 Grade and Tonnage Curve – Indicated and inferred only
Mining and Depletion Surficial historical mining of the lateritic surface cap has been completed to a maximum vertical depth of 5m from the current topographic surface. No historical production records of the mining are available. No dilution or cost factors were applied to the estimate.
Metallurgy The nearby Plutonic and Plutonic East Underground gold mines are current operating mines and there are no material metallurgical issues that are known to exist. It is assumed the ore will be trucked and processed at the Plutonic Gold Plant. No metallurgical recovery factors were applied to the Mineral Resources or resource tabulations.
This announcement has been approved for release by the Board of Directors of Catalyst Metals Limited. Investors and Media: Craig Dingley Catalyst Metals T: +61 (8) 6324 0900 [email protected] Competent Person’s Statement The information in the announcements to which this Mineral Resource Statement is attached that relates to the estimation and reporting of gold Mineral Resources at the Cinnamon deposit is based on information compiled by Mr Andrew Finch, BSc, a Competent Person who is a current Member of Australian Institute of Geoscientists (MAIG 3827). Mr Finch is a full-time employee of Catalyst Metals Ltd and is entitled to participate in the Catalyst Performance Rights Plan. Mr Finch has sufficient experience relevant to the style of mineralisation and deposit type under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Finch consents to the inclusion in the report of matters based on his information in the form and context in which it appears. The information in this announcement that relates to the estimation and reporting of gold Ore Reserves at the Cinnamon deposit is based on and fairly represents information and supporting documentation compiled by Mr Ross Moger BEng (Mining Engineering), a Competent Person who is a member of the Australasian Institute of Mining and Metallurgy (AUSIMM). Mr Moger is a full-time employee of Catalyst Metals Ltd and is entitled to participate in the Catalyst Performance Rights Plan. Mr Moger has sufficient experience that is relevant to the style of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012). Mr Moger consents to the inclusion in the report of the matters based on his information in the form and context in which they are presented. This Ore Reserve estimate has been compiled in accordance with the guidelines defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012).
Compliance Statement The information in this announcement that relates to a Catalyst’s prior exploration results, Plutonic Production Target, estimates of ore reserves and mineral resources are extracted from ASX announcements referenced and available on the Company website www.catalystmetals.com.au and the ASX website (ASX code: CYL). Catalyst confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcement Catalyst confirms that all material assumptions underpinning the Plutonic Production Target, and the forecast financial information derived from the Plutonic Production Target, in the initial announcement continue to apply and have not materially changed. Forward-looking statements This announcement contains forward looking statements. Wherever possible words such as “intends”, “expects”, “estimates”, “projects”, “believes”, and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken to occur or be achieved, have been used to identify these forward-looking statements. Although the forward looking statements included in this announcement reflect management’s current beliefs, based upon information currently available to management and based upon what management believes to be reasonable assumptions, the Company cannot be certain that actual results will be consistent with these forward-looking statements. A number of factors could cause events and achievements to differ materially from the results expressed or implied in the forward-looking statements. Forward- looking statements necessarily involve significant known and unknown risks, assumptions and uncertainties that may cause the Company’s actual results, events, prospects and opportunities to differ materially from those expressed or implied in the forward-looking statements. Accordingly prospective investors should not place undue reliance on forwardlooking statements.
Section 1 Sampling Techniques and Data Cinnamon Deposit (Criteria in this section apply to all succeeding sections.) Criteria Sampling techniques
Commentary
• This release relates to the Mineral Resource Estimate (MRE) update for the Cinnamon Deposit. The Cobalt deposit has been incorporated into Cinnamon MRE for reporting purposes.
• All drilling data completed by Catalyst since acquisition of the ground to the current data cut-off • • • • • • Drilling techniques
• •
Drill sample recovery
• • • •
Logging
• • • • • • •
Sub-sampling techniques and sample preparation
•
• •
date (26 August 2026) has been incorporated. The previous MRE released in June 2024 was based on all historical drilling only that was available as of 6 May 2024. A total of 88,639 m of drilling from 181 diamond and diamond tails, and 147 RC holes have been completed by Catalyst since the previous MRE and form the basis of this Mineral Resource update. The majority of holes have been drilled using a combination of RC and PCD (polycrystalline bits)/rough core pre-collars to an average depth of 212m, followed by DD tails to a maximum depth of 1,012m. Reverse Circulation holes were sampled at a 1m interval from the rig mounted cyclone. The DD tails were sampled using HQ/NQ half core at 1m intervals or to geological boundaries. For DD samples, downhole depth is recorded by the drillers on core blocks after each core run. This was checked and compared to the measurements of the core. The Cinnamon deposit has historically been sampled using numerous drilling and sampling techniques by both Catalyst Plutonic and previous operators. Drilling and sampling techniques by previous operators are assumed to have been to industry standards at that time. Reverse Circulation drilling was conducted utilizing a 5.75 inch face sampling bit. Diamond drilling utilised HQ core with a diameter of 63.5 mm, and NQ core with a diameter of 47.6 mm. Most RC drilling was bagged on 1 m intervals and an estimate of sample recovery has been made on the size of each sample. The core was jig-sawed back together and metre marked carefully. Discrepancies to core blocks are brought up with the drill contractor. Occasionally core loss blocks are inserted. Core recovery for the diamond drilling was based on the measured core returned for each 6m or 3m run. Overall drill core recovery is very good, with an average recovery of 98% through the mineralised zones. There is no known relationship between sample recovery and grade at Cinnamon. All RC pre-collars have been logged on 1m intervals. DD samples have been logged by qualified geologists to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. Logging is both qualitative and quantitative. Logging records include: depth from, depth to, lithology, texture, colour, alteration style, alteration intensity, alteration mineralogy, sulphide (percentage and type), quartz (percentage), veining, and general comments. Orientated core structural measurements are taken at relevant structures and where the foliation is relatively consistent. All drill core and RC chip trays are digitally photographed both wet and dry. All photos are stored on the Company’s servers, with the photographs from each hole contained within separate folders. RC samples were collected for each metre drilled and passed through a cyclone and cone splitter to produce a two kg to four kg assay into calico bags. Depending on the oxidation state of the rock, the sample weight varied between three and five kilograms. The RC drilling and sampling were supervised at the drill site by a company sampler and geologist. The cone splitter has double chutes for field duplicates with infinite adjustment between 4 – 15% per sample chute. The cyclone was cleaned using compressed air after every sample and the cyclone was cleaned every 40m, or more regularly at the geologists' discretion. Most of the RC samples were despatched to the Intertek (ITK) laboratory in Perth for gold fire assay analysis until February 2026, after which they were sent to SGS and BV. Occasional despatches were sent to ALS and Plutonic site lab depending on laboratory availability. Half cut diamond core was sampled on 1m intervals or to geological contacts, with sample lengths varying between 0.1 m to 1.3 m. Whole core sampling was instigated for broken/sheared zones
Criteria
Commentary which could not be cut. This resolved any possible biasing issues with 1/2 core grab samples within incompetent fractured and sheared zones. • Surface DD core samples were sent to several labs: the majority to the Plutonic onsite lab (PAL_DIBK and FA40) and the remainder to ALS (Au-AA26). •
•
•
•
•
•
Sample preparation procedures for the Plutonic onsite lab by PAL method (PAL_DIBK) includes: o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o A nominal 500g riffle split sample is used for PAL assaying for 1 hour leach cycle o PAL 1000 Grind Check: A minimum of 95% passing 75 μm sieve size. o Sample re-assay or duplicate samples are taken from the retained original crushed sample Sample preparation procedures for Plutonic onsite lab by Fire Assay method (FA40) includes: o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o 1-1.5kg riffle split for pulverisation o Pulverise to 85% passing 75μm o Scoop 250-300g aliquot for lead collection Fire Assay 40g charge with AAS finish Sample preparation procedures at ALS laboratory includes: o Sample sorting and drying (DRY-21). o Core sample is coarse crushed (CRU-21), RC samples not crushed. o Pulverise entire sample to a particle size of 85% passing 75µm (PUL-24). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (Au-AA26). Sample preparation procedures at BV laboratory includes: o Sample sorting and drying (PR001). o Entire core sample is crushed to 10mm (PR102), RC samples not crushed. o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 90% passing 75µm (PR303). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (FA450). Sample preparation procedures at SGS laboratory includes: o Sample sorting and drying at 105°C (G_DRY_KG). o Entire core sample is crushed to a nominal 90% passing 2mm (G_CRU_KG). o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 85% passing 75µm (G_PUL). o 200g aliquot for lead collection Fire Assay 50g charge with AAS finish (GO_FAP50V10). Sample preparation procedures at ITK laboratory includes: o Sample sorting and drying at 105°C. o Entire sample is crushed to a nominal 90% passing 2mm (SPO3) o Riffle splitting to obtain between 1.5 to 3kg. o Pulverising to a particle size of 90% passing 75µm (SPO3). o 200g sample aliquot for lead collection by Fire Assay 25g and 50g charges with ICP-OES finish (FA25/OE02 and FA50/OE02). Drill Type Cinnamon RC DD Cobalt
TOTAL
•
RC DD RC DD
ALS FA50 6,171 5,622 549 2,523 2,523 8,694 8,145 549
BV ITK FA50 FA25/FA50 1,142 24,322 1,016 24,322 126 6,090 6,090 1,142 30,412 1,016 30,412 126
PLUTONIC FA40 PAL 2,973 31,848 405 2,568 31,848 141 1,418 141 1,418 3,114 33,266 405 2,709 33,266
SGS FA50 4,064 3,573 491 2,298 2,186 112 6,362 5,759 603
Sample preparation protocols and sample sizes are considered appropriate for the style of mineralisation encountered and should provide representative results.
Total 70,520 34,938 35,582 12,470 10,799 1,671 82,990 45,737 37,253
Criteria Quality of assay data and laboratory tests
Commentary • • • • • • • • • •
Verification of sampling and assaying
• • •
Location of data points
• • •
Data spacing and distribution
• • • • •
Orientation of data in relation to geological structure
• •
• Sample security
• •
Fire assay gold analysis is considered to be total gold analysis. DD samples analysed at Plutonic onsite lab using PAL method (PAL_DIBK). The Pulverising and Leach (PAL) method is not considered to be a total gold analysis, however the larger sample size still produces a representative result. Samples were dried, crushed and pulverised prior to analysis. Certified Reference Material (CRM) were submitted at an average rate of 4% of the total samples. CRMs are of similar grade tenor to those expected grades in the sampling and were selected based on their grade range and mineralogical properties with an emphasis on sulphide ores. Coarse 40mm blanks were inserted at an average rate of 3% of the total samples. RC field duplicates were inserted at an average rate of 2% of the total samples. A mix of field duplicates (1/4 core) and coarse crush duplicates were inserted in the DD drilling, at an average rate of 1% of the total samples. Quality control samples were inserted at an average rate of 10% of the total samples. Crush sizing analysis is conducted randomly by the Laboratory as part of their QC process. Pulp residues are expected to have 90% passing ≤75μm. This data is monitored by the Laboratory Supervisor. Grind times can be lengthened accordingly. Current procedures dictate a process of validation and checking of laboratory results when data is returned by the laboratory as it is loaded into the independently managed Quest database. A standard set of plots and checks are undertaken, and if results fall outside of the expected limits, then re-assaying is requested. QAQC reports are generated by the database administrator and documented from automated routines out of the database. RC and diamond drilling data has been verified by the geologist first and then the Database Administrator before importing into the main Quest database (proprietary database system). RC and DD logging is completed electronically on laptops. Database protocols and rules are applied upon data entry. All drill data within site databases are regularly validated using both internal database systems and external validation tools. All drill collars were accurately surveyed by DGPS using the MGA94 Zone 50 coordinate system. Downhole survey data was collected using an Axis Mining Technology Champ North Seeking Gyro tool. Surveys are undertaken on 30m intervals as the tool is removed from the holes once the hole is completed. Downhole surveys are visually inspected for anomalous changes in drill trace, (i.e does the drill hole deviate excessively). At Cinnamon, resource infill drilling on a nominal 30m grid spacing was undertaken on the HighGrade Shoot to confirm both geological and grade continuity along the main mineralised trend. This spacing was considered adequate to establish both geological and grade continuity and allow conversion of a large part of the Inferred MRE to the Indicated category. Resource definition drilling to extend the resource was conducted on a nominal 50m x 50m spacing. Further extensional drilling on nominal 100m to 200m spaced lines was completed to the northeast of Cinnamon towards the Cobalt prospect and SW towards Budgie. CNWB008 is a water bore hole which is part of an airlift program relating to upcoming mining permits and approval. The orientation of most of the drilling is approximately perpendicular to the strike and dip of the mineralisation and is unlikely to have introduced any sampling bias. Four scissor or reverse dip holes were drilled in the opposite direction (towards the northwest at 340°) to most of the infill holes to test grade continuity within the main high-grade zone. The intersection length and grade tenor of the scissor holes is consistent with other mineralised holes, suggesting an isotropic grade distribution and uncertainty in true-width calculations based on a preferred orientation. o CNR320 – 59.6m @ 9.22g/t from 165m o CNR213 – 15.0m @ 1.12g/t rom 157m o CNR210 – 29.8m @ 3.34g/t from 238m o CNR212A – 23.6m @ 1.69g/t from 266.4m The density of drilling and drilling on other orientations has allowed detailed geological modelling of these structures and hence is not considered to materially affect the resource estimate. The chain of custody is managed by Catalyst employees and contractors. Any unsampled drill core is kept in an unfenced core farm adjacent to the core cutting and
Criteria
Commentary processing shed. This is not regarded as a security risk due to the remote location of the mine with no community development near the mine. All core is photographed and records kept electronically. • Geologists are responsible for marking the sample intervals and placement of Blanks and CRM’s within the sample lot. The Project Geologist and Senior Geologist complete quality control checks on both the Surface and Underground GC drilling data daily. • Field Staff are primarily responsible for sampling of core, generating the sample numbers for core submission, creating a sample submission sheet, selecting and recording the CRMs to be sent to the laboratory and the transportation of the samples to the laboratory. Samples are tracked during shipping. • Once a drillhole has been sampled, the sample intervals and checked geology documents are uploaded into the Quest database system managed by EarthSQL. • The independent Database Administrator (DBA) merges the validated drilling data with the certified laboratory assay files where validation routines for QAQC are completed before database exports and reports are issued. • Drill logs are kept in hard copy and electronically. • Catalyst samples have been stored on site and delivered to the ALS and BV assay laboratories in Perth by a Contracted Transport Company. Consignment notes have been used to track the samples. Operator sample security is assumed to be consistent and adequate. • No specific information has been obtained relating to historical sampling security. • CRMs, blanks and duplicates are reviewed continuously and indicate that sampling and analysis has been completed appropriately with no significant issues discovered. • No audit or reviews of sampling techniques have been undertaken however the data is managed by company geologist who has internal checks/protocols in place for all QA/QC. • Historical reviews of the database for the Marymia area have been examined previously and a proportion of holes were compared to original data sources and found to be consistent wherever checked.
Audits or reviews
Section 2 Reporting of Exploration Results Cinnamon Deposit (Criteria listed in the preceding section also apply to this section.) Criteria Mineral tenement and land tenure status
Exploration done by other parties
• • • • • • •
• • •
Commentary Located in the Marymia - Plutonic Greenstone Belt ~200 km northeast of Meekatharra in the Midwest mining district in WA The Cinnamon drilling campaign occurred on: o M52/228 - granted tenement in good standing. o M52/229 - granted tenement in good standing. The tenements predate Native title interests, but is covered by the Gingirana Native Title claim. The tenements are 100% owned Catalyst Metals Ltd. Gold production will be subject to a 2.5% government royalty. Approximately 15 phases of RAB and aircore drilling have been completed across the Cinnamon Prospect since July 1989. RAB and aircore drilling intersected both lateritic and supergene gold mineralisation over 5.75km NE-SW along the Avery Fault corridor. The Cinnamon Laterite pit was exploited for gold mineralisation in the basal nodular gravels of the transported laterite. Rock-chips taken from quartz veining and haematitic indurated saprolite from a “good-bye cut” at the southern end of the laterite pit returned assay results of 31g/t and 11g/t, respectively. These results suggest mineralised structures beneath the transported laterite may be responsible for the enriched gold-in-laterite. The RC drilling prior to 2001 undertaken by Resolute was generally drilled to test directly under better RAB intersections. Several discrete pods were defined but the orientation of high-grade mineralised zones remains poorly understood. Barrick Gold took over the project from Resolute and completed several phases of RC drilling. In 2001, seventeen RC holes on 40m, 80, 160m and 320m spaced traverses were drilled as a broad test of the northeastern portion of the Cinnamon Prospect. The holes were designed to test for a large mineralised system at depth. The holes returned several broad low-grade zones and several
Criteria •
• • • Geology
•
• • •
Drill hole Information Data aggregation methods Relationship between mineralisation widths and intercept lengths Diagrams Balanced reporting Other substantive exploration data Further work
• • •
• • • • •
Commentary narrow high-grade intersections but failed to establish a large source for the system. Development drilling 2002 consisted of 253 RC holes for 20,218 metres and 2 diamond Geotechnical holes for 295.30 metres. The drilling was staged and targeted at the known mineralised zones depicted in earlier drilling. First pass hole spacing was 40 x 40m around known mineralisation which would be closed to 20 x 20m if significant mineralisation intersected. Further infill & lateral extension drilling in 2003-2004 was completed with 181 holes RC for a total of 17,581m and 11 RC/DD holes for a total of 2,756.86m. 34 RC holes were added in 2010-2011 for a total of 4,733m as infill drilling in the main mineralised zones. Vango Mining completed 4 RC/DD hole in 2018 for a total of 1,137.9m in the main mineralized zone. Catalyst consolidated the Marymia belt in 2023 following the successful acquisition of Vango Mining and the merger with Superior Gold Inc. Regionally, the Plutonic Gold Belt lies in the Archaean Plutonic Well Greenstone Belt, an elongate NE trending belt within the Marymia Inlier. The Marymia Inlier is an Archaean basement remnant within the Proterozoic Capricorn Orogen and comprises two mineralised greenstone belts (Plutonic Well and Baumgarten greenstone belts), with surrounding granite and gneissic complexes. The Marymia Greenstone Belt comprises two corridors of northeast – southwest trending mafic/ultramafic and sedimentary sequences separated by a conglomerate-dominated sedimentary sequence. Cinnamon is a structurally controlled, orogenic, mesothermal (amphibolite metamorphic facies) style gold deposit, which is associated with the late tectonic D3 high-angle thrusting event and open folding and dilation of the earlier D1/D2 thrusts. Gold mineralisation at Cinnamon is hosted within conglomerates bounded and transected by shear zones. The higher grade mineralisation is located in flexures of the shear zones hosted by specific clast supported conglomerate dominated by felsic clasts within a mafic derived matrix. Mineralisation is focussed within the fractured clasts by sulphidic veinlets. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately.
As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. No additional exploration data is included in this release. Grade Control, resource definition, infill and extensional drilling programs are ongoing, and will continue in line with mine development requirements. Further drilling is planned to test along strike and for down-dip extensions to the mineralisation to grow and delineate additional underground resources.
Section 3 Estimation and Reporting of Mineral Resources Cinnamon Deposit (Criteria listed in section 1, and where relevant in section 2, also apply to this section.) Criteria Commentary Database • The Catalyst drillhole database is managed by a third party consultant EarthSQL in the Quest Database integrity system (a proprietary SQL server hosted database). • Cinnamon drilling data has been exported to MS Access and audited before estimation. • Various validation checks in GEOVIA Surpac™ and Seequent Leapfrog Geo™ 3D software and data queries in MS Access were undertaken such as overlapping samples, duplicate entries, missing data, sample length exceeding hole length, unusual assay values and a review of below detection limit samples. A visual examination of the data was also completed to check for erroneous downhole surveys.
Criteria
Commentary The data validation process identified no major drill hole data issues that would materially affect the MRE outcomes. • Database checks included the following: o Checking for duplicate drillhole names and duplicate coordinates in the collar table. o Checking for missing drillholes in the collar, survey, assay and geology tables based on drillhole names. o Checking for survey inconsistencies including dips and azimuths <0˚, dips >90˚, azimuths >360˚ and negative depth values. • The drillhole database used for resource estimation, dated 26 August 2026, was comprised of the following main table records: o Collar – 3,755 o Survey - 11,967 o Lithology - 42,236 Assay - 202,135 • The Competent Person undertakes frequent site visits to the Plutonic Gold Operation and associated Marymia tenements. • The Cinnamon gold deposit is located in the central conglomerate domain of the Marymia Greenstone Belt. Mineralisation is associated with shearing within the chlorite-biotite altered matrix of the conglomerate unit. The conglomerate mostly consists of granodioritic clasts with a mafic derived matrix. Minor quartz veining/silicification and sulphides (pyrrhotite, chalcopyrite) has been observed in the foliated/sheared chlorite-biotite altered matrix. • The gold mineralisation is hosted within conglomerates which are bounded and transected by shear zones. The higher grade mineralisation is located in flexures of the shear zones hosted by specific clast supported conglomerates and is focussed within the fractured felsic clasts by sulphidic veinlets. • Mineralisation has been interpreted as moderate to high-grade subparallel shoots of gold within upper and lower flexures that dip moderately to the northwest in the oxide/transitional zones, and steeply in the primary/fresh zone. • Mineralisation domains have been interpreted primarily using geological logging and downhole geological contacts, based on lithology, gold grade distribution, major fault location and geometry. • A nominal cut-off grade of 0.2g/t Au, and a minimum downhole length of 2m was used to guide the geological continuity of the interpreted mineralisation lodes. • Interpretation of the mineralisation has been undertaken in Seequent Leapfrog Geo™ software using all available drillholes. Intercepts correlating to gold mineralisation and underpinned by strike continuity have been independently identified and manually selected within Seequent Leapfrog Geo ™ prior to creation of implicit volume models. • The geological model is comprised of a total of 22 estimation domains grouped into two main areas of Cinnamon (17 domains) and Cobalt (5 domains). • Catalyst considers confidence is moderate to high in the geological interpretation and continuity of the mineralisation domains. Underground development mapping and sampling has confirmed the local structural controls and lode orientations. • The Cinnamon to Cobalt mineralised corridor is approximately 2,400 m long, 200 m wide, and extends up to 450 m down dip to 180 mRL. • The mineralised domains strike northeast–southwest and are moderately northwest dipping at 60˚ to 75˚. • Estimation domain thicknesses ranges from approximately 0.6 m and up to 45 m in the main High Grade domain (4001). • The MRE interpretation and estimation used a total of 88,639 m of drilling from 181 diamond and diamond tails, and 147 RC holes. • Interpretations used all available drillhole data, but RAB and AC drilling data was excluded from the resource estimation. • The domain intercepts have been imported into the MS Access database and prepared for compositing in Surpac. • No deleterious elements have been estimated or assumed. • Only gold grade has been estimated. • The model has been validated by comparing statistics of the estimated blocks against the composited sample data, and visual examination of the of the block grades versus the assay data in section and swath plots. •
Site visits Geological interpretation
Dimensions
Estimation and modelling techniques
Criteria
Commentary CIK Methodology • All drillhole assay data has been composited to 1m downhole using the best fit algorithm in Surpac. • The moderate to high grade variability and lack of spatial continuity of high grades requires a non-linear approach to deal with the high grades during estimation. A traditional approach of physical domaining, assay cutting, and linear estimation (IDW or OK) is considered inadequate in dealing with this complexity. • The estimation method combines Categorical Indicator Kriging (CIK) to define broad estimation domains, together with applying distance limiting at chosen grade thresholds to restrict the influence of the high-grade values during grade interpolation. • Prior to estimation, a reference surface for the domain has been exported from Leapfrog. This is calculated as the best fit surface using the hanging wall and footwall surfaces. • The reference surface has been imported into Surpac and a dip and dip-direction value of each triangle facets is imported into the Surpac block model to provide information for dynamic search and variogram model orientation during interpolation. Dynamic estimation has been applied for estimating the CIK indicators and gold grades. • Two Categorical Indicator values have been determined: o A low-grade (LG) indicator was assigned to differentiate between background ‘waste’ and lowtenor mineralisation. o A high-grade (HG) indicator was assigned to define broad areas of consistent higher-tenor mineralisation. • Variograms were generated for the LG and HG indicators for Domains 1000, 4001 (High Grade Shoot), and 6099. The variogram and estimation parameters for and then applied to the other domains in the respective groups as follows:
•
•
• •
• •
Area
Domains
Applied Parameters
Cinnamon
4001
4001
All other domains
1000
Cobalt
All domains
6099
The CIK indicators have been estimated using Ordinary Kriging into a finely gridded block model with block dimensions of 1.25m x 1.25m x 1.25m. The small block size for the indicator process is beneficial for creating categorical sub-domains at a resolution which can be used to accurately back-flag composite data. Three categorical sub-domains have been generated: low-grade (LG), medium-grade (MG) and highgrade (HG) areas. The HG sub-domain has been based on an indicator probability threshold of 0.35 and the LG sub-domain has been based on an indicator probability threshold of 0.65. The MG sub-domain is assigned to blocks that do not satisfy either the HG or LG sub-domain criteria. The three categorical block model sub-domains (HG, MG and LG) have been used to ‘back-flag’ the 1m composites, thus creating a separate composite file for each sub-domain. The assay top-cuts have been applied to the sub-domain composite files. The top-cuts are generally above the 99th percentile of the distribution and have been aimed at globally limiting extreme values only. In this estimation methodology, top-cuts are not used as the primary tool to control metal risk. The use of grade thresholds and distance limiting is considered a more objective and influential method in controlling metal risk, while better reflecting the actual localised occurrence of discontinuous highgrade gold mineralisation. Grade thresholds for distance limiting have been determined from log-probability plots and detailed review of the spatial locations of the gold grades. The indicator cut-offs, assay top cuts and grade distance limiting thresholds for each domain are summarised below:
Criteria
Commentary Area Group
Domain Code Indicator
Indicator Assay Grade Distance Cut-offs Top Cut Threshold (metres) (Au g/t) (Au g/t) (Au g/t)
Cinnamon Hanging Wall Lodes
1000, 1010, 1100
1500
Mi nor Lodes
2000
3000
Ginger Shoot
3001
3500 Mi nor Lodes 4000
High Grade Shoot
4001
4500 Footwall Lodes 5000
8010
Supergene Zones
8020
8030
8098 Ci nna mon SW 8099
LG
0.2
1
0.25
20
MG
8
5
20
HG
1
30
18
20
LG
0.15
9999
0.1
20 20
MG
4
1
HG
1
20
12
20
LG
0.25
0.5
0.25
20 20
MG
4
2
HG
1
18
10
20
LG
0.15
1
0.15
20
MG
3
1.5
20
HG
1.2
8
6
20
LG
0.5
0.2
0.1
20 20
MG
8
2
HG
1.8
12
9
20
LG
0.15
9999
0.15
20
MG
0.8
0.6
20
HG
1
15
7
20
LG
0.2
1
0.2
20
MG
15
3
20
HG
1.2
16
10
20
LG
0.15
0.18
0.12
15
MG
1.1
0.9
15
HG
1
80
25
15
LG
0.15
0.3
0.2
20
MG
1.5
1
20
HG
1
8
6
20
LG
0.25
0.3
0.2
20
MG
1.5
1
20
HG
1
8
6
20
LG
0.15
0.6
0.2
20
MG
2
1
20
HG
0.8
6
4
20
LG
0.15
0.6
0.2
20
MG
2
1
20
HG
1.2
6
4
20
LG
0.2
9999
0.15
20 20
MG
4
1.2
HG
1.2
20
8
20
LG
0.15
0.1
0.1
20
MG
1
1
20
HG
1
6
4
20
LG
0.15
0.1
0.1
20
MG
1
1
20
HG
0.8
6
4
20
Cobalt 6095
Supergene Zone
6097
6098
Centra l Zone
Wes t Zone
•
6096
6099
LG
0.1
0.15
0.09
20
MG
0.8
0.65
20
HG
0.8
9999
3
20
LG
0.12
9999
0.1
20
MG
1.8
1.2
20
HG
1.2
3.5
3
20
LG
0.08
0.28
0.07
20
MG
1.5
0.4
20
HG
0.4
7
3
20
LG
0.1
9999
0.06
20
MG
1.4
1.2
20
HG
1.3
14
9
20
LG
0.1
1.2
0.09
20
MG
3
0.6
20
HG
0.6
22
5
20
Prior to grade estimation, sub-domain codes from the 1.25m resolution block model have been
Criteria
Moisture
Commentary imported into a Y=2.5m x X=2.5m x 2.5m resolution block model and the proportion of LG, MG and HG is calculated for each 2.5m x 2.5m x 2.5m block. • The choice of a 2.5m x 2.5m x 2.5m block size reflects the likely mining selectivity achievable for an underground mining scenario. • Grade estimation for the LG, MG and HG sub-domains has been undertaken in Surpac software using Ordinary Kriging (OK) with grade threshold distance limiting. Search routines and variogram orientations are drawn from the pre-populated dynamic search information recorded in each block (dynamic anisotropy). • Final block grades at a 2.5m x 2.5m x 2.5m block resolution have been calculated by weighting the estimated grades for each sub-domain by the relevant domain proportion. The parent estimation block size is 2.5m x 2.5m x 2.5m. • A single-pass estimation strategy has been used across all domains, where a search radius of 50m and minimum 2 to maximum 12 composites has been utilised to estimate a grade. It is possible that up to 36 composites can be used to estimate a parent block where there is a proportion of all three subdomains present. Octant restrictions have not been used. • Block sizes were selected based on drill spacing and the thickness of the mineralised veins. • No selective mining units were assumed in the resource estimate. • Only Au grade was estimated. • All estimations have been carried out on a ‘dry’ basis.
Cut-off parameters
• •
Mining factors or assumptions
• • • • •
Metallurgical factors or assumptions Environmental factors or assumptions
• • • • • •
Bulk density
•
Classification
• •
•
The Cinnamon Underground Mineral Resources is reported at a cut-off grade of 1.5 g/t Au. The cut-off grade has been derived from current mining and processing costs and metallurgical parameters used for the operating Keillor Underground mine and at the nearby Plutonic Underground Mine. o Cinnamon Open Pit Mineral Resources are reported at a cut-off grade of 0.5 g/t Au derived from recent mining and processing costs and metallurgical parameters used at the recently completed Trident West Open Pit. The Cinnamon Underground Mineral Resources is reported to a maximum vertical depth of 450m below the topographic surface at a 1.5 g/t Au cut-off grade for fresh material only. Mining selectivity is assumed to include a minimum mining width of 1.5m, minimum stope length of 5m, and a minimum stope height of 5m. The Cinnamon Open Pit Mineral Resource is reported at a 0.5 g/t Au cut-off grade for oxide and transitional material only. Mining selectivity is assumed to be on 2.5m vertical benches with a 5m x 5m Selective Mining Unit (SMU). It is assumed that underground and open pit mining is possible at the project if demonstrated to be economically viable to be trucked and processed at the Plutonic Gold Plant. No mining parameters or modifying factors have been applied to the Mineral Resource. It is assumed the ore will be trucked and processed at the Plutonic Gold Plant. Recovery factors are assigned based on lab test work and on mining factors derived from the current Keillor Underground mine and the nearby recently completed Trident West Open Pit. No metallurgical assumptions have been built or applied to the resource model. The area is not known to be environmentally sensitive and there is no reason to think that proposals for development including the stockpiling of waste would not be approved. The small amount of waste rock would be stored in a traditional waste rock landform ‘waste dump’. Due to low sulphide content and the presence of carbonate alteration the potential for acid content is considered low. Density has been assigned to the resource models using interpreted weathering surfaces determined from drill hole logging. o Oxide =1.8 o Transitional=2.4 Fresh=2.7 Mineral Resources were classified as Indicated and Inferred to appropriately represent confidence and risk with respect to data quality, drillhole spacing, geological and grade continuity and mineralisation volumes. Additional considerations were the stage of project assessment, amount of DD and RC drilling undertaken, current understanding of mineralisation controls and mining selectivity within the mining environment. The drilling, surveying and sampling undertaken, and analytical methods and quality controls used, are
Criteria
Audits or reviews Discussion of relative accuracy/ confidence
Commentary appropriate for the style of deposit under consideration. • Factors considered when classifying the model include: o The portions of the Cinnamon MRE classified as Indicated have been flagged in areas of the block model where the average distance to the nearest informing composited drill intercept was nominally 30m or closer. o The portions of the MRE classified as Inferred typically represent minor lodes or lower grade portions of the larger domains where geological continuity is present but not consistently confirmed by 30m spaced composited drill data. The extrapolation of the resource was limited to a maximum of 80m past the last sample point. • Further considerations of resource classification include; data type and quality (drilling type, drilling orientations, down hole surveys, sampling and assaying methods); geological mapping and understanding. • The Mineral Resource estimate appropriately reflects the view of the Competent Person. • The geological interpretation, estimation parameters and validation of the resource model was peer reviewed by Catalyst staff. • No external reviews of the resource estimate had been carried out at the time of writing. • The relative accuracy of the Mineral Resource estimate is reflected in the reporting of the Mineral Resource as per the guidelines of the 2012 JORC Code. • The statement relates to the global estimates of tonnes and grade.
Section 4 Estimation and Reporting of Ore Reserves Cinnamon Reserve (Criteria listed in section 1, and where relevant in sections 2 and 3, also apply to this section.)
Criteria
Commentary
Mineral Resource estimate for conversion to Ore Reserves
•
The Mineral Resource Estimate (MRE) used for the Cinnamon open pit and Cinnamon underground Ore Reserve is described in Section 3.
•
Only the Indicated portion of the Mineral Resources are reported, and they are inclusive of the Ore Reserve. The Ore Reserves are a subset of the MRE and are spatially contained within the MRE.
Site visits
•
The Competent person is a full-time employee of Catalyst Metals and has conducted regular visits to the Plutonic Mine Site and Cinnamon the proposed processing and mining locations. The competent person has no concerns arising from these visits that would impact the Ore Reserve viability The open pit and underground Ore Reserve has been generated from a Pre-Feasibility study level assessment, appropriate for the size and scale of proposed operations. The study has had both internal Catalyst personnel and external consultants provide inputs into the mine plan with appropriate geotechnical, hydrological, equipment, metallurgical and mining method information applied. Open pit mining costs have been derived from recent open pit Western Australian contractor quotations and Catalyst’s recent open pit mining costs. Underground mining costs are based on current Plutonic underground mining costs in addition to recent vendor quotations where mining methods differ from Plutonic operations, such as the application of paste fill. All other costs are based on recent actual Catalyst costs and recent vendor quotations. Modifying factors accurate to the study level have been applied. The resulting mine plan is technically achievable and economically viable. Economic cut-off grades have been applied in estimating the Ore Reserve. The cut-off grade applied to the Ore Reserve estimate is defined as the g/t gold grade at which the revenue generated breaks even on a $A value per tonne of ore after consideration of all costs (mining, processing, general and administration), metallurgical recoveries, sustaining capital, transport costs and royalties.
• Study status
• • • • • •
Cut-off parameters
• •
Criteria
Commentary • •
Mining factors or assumptions
An open pit cut-off grade of 0.6 g/t has been applied which accounts for all mining, processing, surface haulage and administrative costs utilising a $4,500 gold price. All royalties and metallurgical factors are also applied in the cut-off grade calculations. Underground cut-off grade for incremental stopes, of 1.6 g/t has been applied which accounts for all mining, processing, surface haulage and administrative costs utilising a $4,500 gold price. All royalties and metallurgical factors are also applied in the cut-off grade calculations. Mining method Open Pit • Conventional open-pit truck-and-shovel method, utilising 200-t excavators and 90-t haul trucks. • Load-and haul, drilling and blasting will be performed by mining contractors. Ore haulage to the Plutonic mill will be undertaken by the a road-train contractor. Geotechnical and geological Open Pit • Open pit Ore Reserve designs have been reviewed by Catalyst geotechnical team for appropriate application of geotechnical parameters including wall angles, berm widths, and stability assessments and all other relevant geotechnical parameters. • Grade control drilling costs and scheduling have been allowed for in open pit evaluations. Mining ore loss and dilution Open Pit • In the open pit Ore Reserve representative dig blocks were generated to determine appropriate dilution and ore loss figures. • Dilution factors of 17% in oxide, 19% in transitional and 21% in fresh material have been applied in the open pit Ore Reserve • A mining recovery factor of 93%, or stated as a 7% ore loss allowance, has been applied in the open pit Ore Reserve.Pit optimisation and design • Open pit optimisations were completed in Whittle mining software. Pit optimisations were completed at a A$4,500/oz gold price and exclude inferred and unclassified resources. • From the open pit optimisation, a pit design, mining schedule and financial assessment were completed confirming technical achievability and economic viability • Pit designs maintained dual ramp access for the upper ~2/3rds of the pit, with the lower ~1/3rd utilising a single lane ramp Consideration of Inferred Mineral Resource • Any Inferred or Unclassified Mineral Resources captured within both the underground and open pit mine plans have been assigned a zero-grade value and the material treated as waste. • No Inferred Mineral Resources are included in the declared Ore Reserves of the open pit or underground Underground mining method, ore loss and dilution • The underground Ore Reserve estimate is based on long-hole stoping with paste fill mining methodology. The mining modifying factors are based on the geotechnical inputs and assumed mining methods. • The Ore Reserves estimate is generated by designing stope shapes using Deswik’s Stope Optimiser (DSO). A development layout was then designed to align with the stope shapes and scheduled in Deswik scheduling software. • DSO input parameters include a 1.6 g/t Au cut-off, minimum mining width of 2.5 m, 0.5 m hanging wall dilution and 0.5 m footwall dilution at Mineral Resource model grade. • Additional dilution of 5% was applied to all paste filled stopes at zero grade. • Development had no dilution applied and 100% mining recovery assumed. • Mining recovery of 92.5% was applied allowing for bogging losses typically realised in longhole stoping. • Post application of all recovery and dilution factors, stopes below 1.6 g/t were removed from the mine plan.
Criteria
Commentary
Metallurgical factors or assumptions
•
•
A minimum footwall dip angle of 40 degrees was utilised. Geotechnical and geological Underground • Underground Ore Reserve designs have been reviewed by Catalyst geotechnical team for appropriate application of geotechnical parameters including stope size, dilution, ground support and capital development layout and all other relevant geotechnical parameters • Grade control drilling costs and scheduling have been allowed for in underground evaluations. Consideration of Inferred Mineral Resource • Any Inferred or Unclassified Mineral Resources captured within the mine plan have been assigned a zero-grade value and the material treated as waste. • No Inferred Mineral Resources are included in the declared Ore Reserves Mining infrastructure requirements of the selected mining methods • Infrastructure requirements for both open pit and underground mining have been accounted for including power generation, workshops, offices, fuel farm, water storage, diesel storage, dewatering infrastructure, and ventilation.
• • • • • Environmental
•
Infrastructure
• • •
• Costs
• •
The Ore Reserve will be treated at the established and currently operating Plutonic processing facility. The facility is a conventional crushing, gravity circuit, grind, and CIL (carbon in leach) plant and is appropriate for the extraction of gold from free milling mineralisation and is well-tested technology Catalyst has undertaken PFS-level metallurgical test work. The aim of the program was to define the performance of the Cinnamon open pit and Underground ore through the established Plutonic 2.0 Mtpa gravity/CIL plant Samples and test work were done over various lithological and weathering profiles throughout the orebody and are considered representative of the orebody as a whole A series of leach and absorption tests were conducted indicating a range of 92%-94% metallurgical recovery across all oxide and transitional weathering profiles and ranging from 90-92% for fresh weathering profiles A 92% metallurgical recovery has been applied in assessing the open pit Ore Reserve, and 90% in the underground Ore Reserve which are the lower bounds of the existing test work and metallurgical analysis Concentrations of deleterious elements have been noted as low across different ore types including fresh, transitional and weathered ore. Catalyst will be progressing with mining approvals and permits as the project advances and sees no impediments to the granting of these approvals and permits. Processing plant and tailings storage facilities are located at Plutonic and will be utilised for the processing of Cinnamon ore and deposition of resulting tailings. Camp, accommodation, and air strip facilities are also located at Plutonic and will be utilised by the Cinnamon workforce. Development of Cinnamon will require pre-production capital for the development of: haul roads site clearing establishment and dis-establishment of all facilities including workshop, offices and ablutions, fuel storage, explosives magazine, sundries mobilisation and demobilisation Capital estimates for these site works were provided by a contractor and have been considered in the Cinnamon economic assessment. Underlying capital and operating costs assumptions are to a Pre-feasibility level. Open pit mining costs are derived from a Request for Quotation (RFQ) process, which reflect recent open pit Western Australian contractor costs and ancillaries.
Criteria
Commentary •
• •
Revenue factors
• • • •
Market assessment
• •
Economic
• • •
Social
• •
Other
• • •
Classification
Audits or reviews Discussion of relative accuracy/ confidence
• • • • • • • • •
Underground mining costs are based on current Plutonic underground mining costs in addition to recent vendor quotations where mining methods differ from Plutonic operations, such as the application of paste fill. All other costs are based on recent actual Catalyst costs and recent vendor quotations. Processing and general and administrative costs, salaries, and camp and accommodation costs are based on recent actuals from the Plutonic mining operation. Allowances have been made for State royalties (2.5%) payable on net revenue. Surface haulage rates have been applied based on current contractor pricing Power will be provided via diesel generators The open pit and underground Ore Reserve has been assessed at a sale price of A$4,500/oz Gold metal is a freely and widely traded commodity with a transparent mechanism for setting prices and for sale of gold produced. Catalyst has not conducted any studies or analyses such as commodity price projections, product valuations, market entry strategies, or product specification requirements The Cinnamon operation demonstrates a positive Net Present Value (NPV) based on the stated cost parameters, revenue assumptions, and a discount rate of 7%, consistent with the assumption used for Ore Reserve estimation. A sensitivity analysis was conducted on key parameters, including gold price, mining costs, processing costs, and capital costs (±20%), as well as metallurgical recovery (±5%). The NPV is most sensitive to changes in gold price. However, with the current spot price materially higher than the Ore Reserve price ($4,500/oz), short-term variability in the gold price is not expected to have a material impact on the Ore Reserve estimate.
Catalyst has, and will continue, to engage with key stakeholders. This includes traditional landowners, local shire governments and the various pastoral stations surrounding our tenements. There are no immediate concerns that would suggest any impact to the Ore Reserve statement on this basis. Catalyst continues to engage with local personnel in providing employment opportunities. Contracts are in place at Plutonic for critical supplies. Cinnamon is expected to leverage off Plutonic’s supply chain and procurement. Granted mining leases cover all the proposed mining and processing assets. No other matters, other than disclosed in this Table 1 are considered material to the estimation and reporting of this Ore Reserve The Ore Reserves classification reflects the Competent Person’s view of the deposit. Only Probable reserves have been declared and are based on Indicated Resources following consideration of modifying factors. No Probable Ore Reserves are derived from Measured Resources. This Ore Reserve estimate has not been reviewed by an external third party. The accuracy of the Ore Reserve estimate is largely dependent on the geological estimate, and so reflects the confidence in the in the Mineral Resource The Ore Reserve has been completed to a Pre-Feasibility study level of assessment The Ore Reserve is a global estimate Modifying factors including dilution and recovery, mining and processing recoveries, geotechnical parameters and cost inputs and resulting application are appropriate for the level of study As the supporting work is done to a Pre-Feasibility study level, further geological, geotechnical, and metallurgical work is planned.
Catalyst Metals Limited (Catalyst or the Company) (ASX:CYL) advises that the 2026 annual general meeting of the Company will be held on Thursday, 12 November 2026. Further information about the annual general meeting will be included in the notice of meeting and explanatory memorandum to be available for shareholders in early October 2026. In accordance with the Company’s Constitution, the closing date for the receipt of nominations for the election of directors is 24 September 2026. Any nominations must be received in writing at the registered office of the Company by that date. This announcement has been approved for release by the Board of Catalyst Metals Limited. Investors and Media: Craig Dingley Catalyst Metals T: +61 (8) 6324 0900 [email protected]
In so doing, Catalyst is aiming for Plutonic to have a 10 year mine life - a unique and rare proposition for an underground Western Australian gold mine. Catalyst also controls a processing plant and +75km of strike length immediately north of the historic +22Moz Bendigo goldfield. Here, Catalyst has delineated a high-grade, greenfield resource at 26 g/t Au. Further discoveries along strike are expected. Capital Structure Shares o/s: 261m Options: 0.1m Rights: 11.9m Cash & Bullion: A$331m Debt: Nil Reserve and Resource1 MRE: 4.5Moz at 3.3g/t Au ORE: 1.5Moz at 2.6g/t Au
Compliance Statement The information in this announcement that relates to a Catalyst’s estimates of ore reserves and mineral resources are extracted from ASX announcements referenced and available on the Company website www.catalystmetals.com.au and the ASX website (ASX code: CYL). Catalyst confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcement
Corporate Details ASX: CYL E:[email protected] om.au
ASX:CYL
Note 1: MRE includes Indicated Resources of 32.9Mt at 23.3g/t for 3.4Moz and Inferred Resources of 9Mt at 2.7g/t for 0.8Moz. ORE includes probable Reserves of 18.1Mt at 2.6g/t for 1.5Moz. Refer to ASX announcement 14 October 2025 “Annual Report to Shareholders”
1
ASX Announcement 14 September 2026 Catalyst Metals’ flagship asset is the 40km long Plutonic Gold Belt in Western Australia. This belt currently produces ~100koz pa at an AISC of ±A$2,800/oz from three mines at Plutonic Main, Plutonic East and Keillor.
Trident Reserve grows by 30%; ongoing infill drilling of 448koz inferred Resource expected to further grow Reserves
Catalyst is currently bringing three new mines into production - Trident UG, Cinnamon & Old Highway. Each will be processed through the existing, underutilised and centrally located 2Mtpa CIL processing plant.
• Trident’s underground Reserve has increased by 32% to 524koz at 4.2g/t Au, with an anticipated ±10 year mine life at a steady state annual production rate of 60-80koz
Exploration is targeting down dip extensions of each of these deposits. With the development and exploration of these six deposits, Catalyst aims to increase Reserves and production from 1.5Moz to ±2Moz and ±100koz to ±200koz annually. In so doing, Catalyst is aiming for Plutonic to have a 10 year mine life - a unique and rare proposition for an underground Western Australian gold mine. Catalyst also controls a processing plant and +75km of strike length immediately north of the historic +22Moz Bendigo goldfield. Here, Catalyst has delineated a high-grade, greenfield resource at 26 g/t Au. Further discoveries along strike are expected. Capital Structure Shares o/s: 261m Options: 0.1m Rights: 11.9m Cash & Bullion: A$331m Debt: Nil Reserve and Resource1,2 MRE: 4.5Moz at 3.3g/t Au ORE: 1.5Moz at 2.6g/t Au Corporate Details
• This is another step toward Catalyst’s 2Moz Reserve target to support a long-term ±200koz annual production rate • In June 2026, Catalyst released an updated Resource at Trident of 1.1Moz at 5.4g/t Au • Resource growth over the past 12 months at Trident came largely from new inferred Resources, as drilling sought to test extensions of the exiting deposit. Inferred Resources at Trident are 448koz • In the past, Trident’s inferred Resources have had a 75% conversion into indicated. Further infill drilling is expected to increased Reserves and extensions to mine life • Development of the Trident underground mine is currently underway with 250m of development completed. First ore is expected in CY2027 • Trident is currently the second-largest deposit on the Plutonic Belt. It is expected to form a second, higher grade base load ore source to the central Plutonic processing plant as part of Catalyst’s plan to increase annual gold production from ±100koz to ±200koz3 • The Trident underground will be the fourth mine to be developed on the Plutonic Belt, the first three being Plutonic East, Trident open pit and K2 • In September 2025, Catalyst released general 10-year guidance. Since then, Catalyst has, understandably, seen changes to permitting timelines, Reserves/Resources, geological understanding, operational delays and processing capacities • As a consequence, the September 2025 guidance should be seen as a general guide as to the management’s long-term plans for Plutonic Belt’s future production. Future guidance will update to reflect new changes being observed
Catalyst Metals Limited (Catalyst or the Company) (ASX:CYL) is pleased to provide an updated Ore Resource estimate for the Trident underground gold deposit, located on the Plutonic Gold Belt in Western Australia. Trident’s Reserves are shown below: Classification Proved Probable Total
Tonnes (Mt)
Grade (g/t Au)
Ounces (Koz)
3.9 3.9
4.2 4.2
524 524
ASX: CYL E:investors@catalystmetals .com.au W:catalystmetals.com.au
ASX:CYL
Note 1: MRE includes Indicated Resources of 32.9Mt at 3.3g/t for 3.4Moz and Inferred Resources of 9Mt at 2.7g/t for 0.8Moz. ORE includes probable Reserves of 18.1Mt at 2.6g/t for 1.5Moz. Note 2: Refer to ASX announcement 14 October 2025 “Annual Report to shareholders Note 3: Refer to ASX announcement 10 September 2025 “Plutonic Belt Reserves double, supporting growth plans
1
This Reserve follows an updated Resource released in June 2026 of 6.2Mt at 5.4g/t Au for 1.1Moz. Trident’s Mineral Resources estimates (MRE) are noted below3: Classification Indicated Inferred Total
Tonnes (Mt)
Grade (g/t Au)
Ounces (Koz)
3.1 3.1 6.2
6.3 4.6 5.4
633 448 1,081
Figure 1: Trident long section showing Reserves and life of mine planned production
In June 2026, Catalyst released an updated Mineral Resource for Trident of 1.1Moz at 5.4g/t Au 3. A large part of the Resource growth came from inferred material, reflecting the focus on Resource extension drilling over the past 12 months. Trident currently has a +10 year mine life and in time, infill drilling will target further conversion of inferred Resources to indicated, and subsequently Reserves. Historically, infill drilling of inferred Resources has had a conversion rate of around 75% to indicated. The Trident Reserve is another step toward Catalyst’s target of defining a ±2Moz Reserve across Plutonic to support a long-term, sustained production rate of ±200koz per annum for 10 years.
3 ASX Announcement dated 23 June 2026 “Trident Resources grows to 1.1Moz at 5.4g/t”
ASX:CYL
2
Trident Underground Ore Reserves An Ore Reserve is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted. No inferred Mineral Resources are included in the Ore Reserves. Following is a summary of the Trident Underground Ore Reserves, as at 01 July 2026. Table 3: Trident Ore Reserves Proved
Probable
Total
Deposit
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Tonnes (Mt)
Grade (g/t Au)
Gold (koz)
Trident UG
3.9
4.2
524
3.9
4.2
524
Notes: 1. 2.
Numbers may not add up due to rounding Ore Reserves are based on a gold price of $4,500/ounce
Trident Gold Project Trident is an underground gold deposit located 30km north-east of the underutilised Plutonic processing plant. Trident underground comprises a Probable Reserve of 3.9Mt at 4.2g/t Au for 524koz of gold and a Resource of 6.2Mt at 5.4g/t Au for 1,081koz (including Indicated of 3.1Mt at 6.3g/t Au for 633koz). Resources are inclusive of Reserves. Mining of a small open pit at Trident commenced in July 2025 and was completed in May 2026. Ore from the open pit has been stockpiled at Trident and will be progressively transported and processed at the Plutonic processing plant over the remainder of CY2026. Catalyst’s objective with the Trident open pit was to establish access for development of the underground decline i.e. a box-cut. Grade control drilling of the first 15 months of production has been completed. In Catalyst’s view, developing these drill stocks ahead of the mine plan provides operational flexibility and is key to de-risking early mining operations in the project’s ramp up phase. To date, increased drilling density at Trident has resulted in improved grade. This was noted with both Resource conversion and grade control drilling. Trident is currently the second largest deposit on the Plutonic Gold Belt. The underground mine is expected to operate at a production rate of 60-80koz per annum for +10years and will form a second, higher-grade base load ore source feeding the Plutonic processing plant.
ASX:CYL
3
Material information summary as required under ASX Listing Rule 5.9. ORE RESERVE ESTIMATES (Trident)
- Level of Study The declaration of the Trident underground Ore Reserve estimation is generated from a feasibility level assessment. The study has had both internal Catalyst personnel and external consultants provide inputs into the mine plan with appropriate geotechnical, hydrological, equipment, metallurgical and mining method information. The level of accuracy of the of the mine plan is technically achievable and economically viable.
Classification
A ‘Probable Ore Reserve’ is the economically mineable portion of an Indicated Mineral Resource. The Ore Reserves classification reflects the Competent Person’s view of the deposit. Only Probable reserves have been declared and are based on Indicated Resources following consideration of modifying factors. No Probable Ore Reserves are derived from Measured Resources, as there was no Measured Resource within the MRE. Any Inferred or Unclassified Mineral Resources captured within the underground mine plan have been assigned a zero-grade value and the material treated as waste. 3.
Mining Method
The Trident Mine Plan is based on extracting an initial small open pit (exploiting the near surface projection of the Trident ore system) with subsequent portal and decline development into the Trident Underground Mine. There has been no historical mining of this ore system, mining of the open pit commenced in 2025. The Trident Operations are using shared infrastructure with the Plutonic Operation located ~25 km to the south-west. Shared infrastructure includes the Plutonic processing facility, administration, travel and accommodation services. The underground mine design, schedule and costings are representative of a typical Western Australian underground mine. Mining has been scheduled in various blocks to ensure multiple work fronts, with each block using a combination of top-down or bottom-up. Production rates, fleet requirements, manning levels, and mining costs are built from a combination of inputs from first principles calculations, industry experience, and the existing Plutonic operation. Mining operations were assumed to be owner-operator by Catalyst. Dedicated geological, hydrology, backfill and geotechnical studies have been completed and form key input parameters for the mine design, schedule and costings. Longhole stoping with paste fill was selected as the preferred mining method at Trident. This is a well-understood mechanised mining method used in mining operations globally. It is proposed that longhole stoping with paste fill will use longitudinal extraction with multiple stopes taken in panels along strike. The proposed mining sequence will be a combination of bottom-up and top-down extraction. The use of paste fill as a backfill method will allow more selectivity in extraction, higher extraction ratio which can be regulated with the paste fill cement content, as well as flexibility in extraction sequence, allowing multiple mining fronts to achieve higher production rates.
ASX:CYL
4
Processing
Extensive metallurgical test work of the Project has been undertaken historically by previous owners. This test work focused on gravity and cyanidation recovery. Test work has been conducted on RC and diamond drilled fresh ore composites, and transitional and oxide composites. Catalyst engaged Independent Metallurgical Operations (IMO) and its partner Metallurgy Pty Ltd (Metlab) to conduct a DFS-level testwork study designed by IMO and Extreme Metallurgy on presented diamond core samples. The aim of the program was to define the performance of the Trident Underground ore will be processed through the established Plutonic 2.0 Mtpa gravity/CIL plant. 5.
Cut-off Grade
The cut-off grade applied to the Ore Reserve estimate is defined as the gold grade at which the revenue generated breaks even on a $A value per tonne of ore after consideration of all costs (mining, processing, general and administration, metallurgical recoveries, sustaining capital, transport costs and royalties). Individual stope designs are based on a break-even cut-off grade of 2.0 g/t and then mining areas are analysed globally to ensure they are economically viable to account for total mining access, extraction, processing, and all other relevant costs. 6.
Estimation Methodology
The Ore Reserves estimate is generated by designing stope shapes using Deswik’s Stope Optimiser
(DSO). A development layout was then designed to align with the stope shapes and scheduled in
Deswik scheduling software.
MSO input parameters include a 2.0 g/t Au cut-off, minimum mining width of 3.0 m, 1.0 m hanging
wall dilution and 0.5 m footwall dilution in the flatter lying areas of the orebody (<40 degrees), and
0.5 m hanging wall dilution and 0.5 m footwall dilution in steeper dipping areas (>40 degrees), of
the orebody. Additional dilution of 5% at zero, waste grade, was applied to all paste filled stopes.
Development had no dilution applied and 100% mining recovery assumed.
Mining recovery of 92.5% was applied to all stopes. The mining recovery factor allows for bogging
losses typically realised in longhole stoping.
Post application of all recovery and dilution factors, stopes below 2.0 g/t were removed from the
mine plan.
A minimum footwall dip angle of 40 degrees was utilised.
7.
Other Material Factors, Approvals and Infrastructure
Trident mining method specific infrastructure includes the provision of a paste fill plant for backfilling stope voids and a surface batch plant for cement supply. Other key infrastructure that is required for the underground mining operation includes power generation and reticulation, primary ventilation infrastructure, office buildings, maintenance workshops, explosive magazines, water reticulation and storage, ore stockpiles and waste dumps, evaporation ponds, and other facilities. The stated infrastructure has been allowed for in costings.
ASX:CYL
5
Processing plant and tailings storage facilities are located at Plutonic and will be utilised for the processing of Trident ore and deposition of resulting tailings. Camp, accommodation, and air strip facilities are also located at Plutonic and will be utilised by the Trident workforce. Power for the Trident mine will be supplied from diesel gensets and life-of-mine requirements were modelled within the Feasibility Study. The Ore Reserve has been completed to a Feasibility study level of assessment. Granted mining leases cover all the proposed mining and processing assets. Trident has all required mining approvals and permits in place.
This announcement has been approved for release by the Board of Directors of Catalyst Metals Limited. Investors and Media: Craig Dingley Catalyst Metals T: +61 (8) 6324 0900 [email protected] Competent person’s statement The information in this announcement that relates to the estimation and reporting of gold Ore Reserves at the Trident deposit is based on and fairly represents information and supporting documentation compiled by Ross Moger BEng (Mining Engineering), a Competent Person who is a member of the Australasian Institute of Mining and Metallurgy (AUSIMM). Ross Moger is a full-time employee of Catalyst Metals and is entitled to participate in the Catalyst Performance Rights Plan. Ross Moger has sufficient experience that is relevant to the style of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012). Ross Moger consents to the inclusion in the report of the matters based on his information in the form and context in which they are presented. This Ore Reserve estimate has been compiled in accordance with the guidelines defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012). JORC 2012 Mineral Resources, Ore Reserves The information in this announcement that relates to a Catalyst prior exploration results, production targets, estimates of ore reserves and mineral resources are extracted from ASX announcements referenced and available on the Company website www.catalystmetals.com.au and the ASX website (ASX code: CYL). Catalyst confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcement. Catalyst confirms that all material assumptions underpinning the production target, or the forecast financial information derived from a production target, in the initial announcement continue to apply and have not materially changed.
ASX:CYL
6
Section 1 Sampling Techniques and Data Trident Deposit (Criteria in this section apply to all succeeding sections.) Criteria Sampling techniques
Drilling techniques Drill sample recovery
Logging
Sub-sampling techniques and sample preparation
ASX:CYL
Commentary • This release relates to the Ore Reserve Estimate (ORE) update for the Trident Underground Deposit. • All drilling data completed by Catalyst since the previous ORE (September 2025) to the current data cut-off date (10 September 2026) has been incorporated. • The majority of holes have been drilled using a combination of RC pre-collars to an average depth of 220m, followed by DD tails to a maximum depth of 699.7m. A total of 111,001m of drilling from 230 diamond/diamond tails and 110 RC drillholes form the basis of this Mineral Resource Update. This included 72 RC grade control holes for 11,221m to an average depth of 155m. • Reverse Circulation (RC pre-collars) through the overlying granite cover rocks have been sampled using 3m composited samples from the original 1m samples from the rig mounted cyclone. Precollars located within the Resource footprint have not been sampled through the barren granite cover rocks. • DD tails have been sampled using NQ2 half core through the ultramafic host rocks at 1 m intervals or to geological boundaries • For DD samples, downhole depth is recorded by the drillers on core blocks after every run. This is checked and compared to the measurements of the core by a geologist to honour geological boundaries (lithology, mineral assemblage, alteration etc). Sample lengths typically vary between 0.2m and 1.6m. • Reverse Circulation drilling has been conducted utilizing a 5.75 inch face sampling bit. • Diamond drilling utilises NQ core with a diameter of 47.6 mm. • All holes have been logged on site by an experienced geologist. • The core is jig-sawed back together and metre marked carefully. Discrepancies to core blocks have been brought up with the drill contractor. Occasionally core loss blocks are inserted. • Core recovery for the diamond drilling is based on the measured core returned for each 3m run. • Overall drill core recovery is very good, with an average recovery of 99% through the mineralised zones. • RC drilling has been bagged on 1m intervals and an estimate of sample recovery made on the size of each sample. • There is no known relationship between sample recovery and grade at Trident. • All RC pre-collars have been logged on 1m intervals. • DD samples have been logged by a qualified geologists to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. • Logging is both qualitative and quantitative. • Logging records include: depth from, depth to, lithology, texture, colour, alteration style, alteration intensity, alteration mineralogy, sulphide (percentage and type), quartz (percentage), veining, and general comments. • Orientated core structural measurements have been taken at relevant structures and where the foliation is relatively consistent. • All DD core has been digitally photographed. • Reverse Circulation (RC pre-collars) through the overlying granite cover rocks were sampled using 3m composited samples from the original 1m riffle split samples from the rig mounted cyclone. Precollars located within the Resource footprint have not been sampled through the barren granite cover rocks. • Half cut diamond core was sampled on 1m intervals or to geological contacts, with sample lengths varying between 0.2m to 1.6m. • Whole core sampling for Resource drilling has been instigated to resolve any possible biasing issues with 1/2 core grab samples in broken/sheared zones which could not be cut. • All RC composited samples were dispatched to the ALS laboratory in Perth for gold fire assay analysis. • NQ core samples have been sent to several labs: the majority to ALS (Au-AA26), some to SGS (GO_FAP50V10) and several holes to Plutonic onsite lab (PAL_DIBK). • Sample preparation procedures for RC samples includes: o 1-4 hours drying at 150°C depending on moisture content o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 85% passing 75µm. • Sample preparation procedures for DD by Plutonic onsite lab (PAL_DIBK) includes:
7
Criteria
Quality of assay data and laboratory tests
Verification of sampling and assaying
Location of data points
Data spacing and distribution
Orientation of data in relation to geological structure
ASX:CYL
Commentary o 1-4 hours drying at 150°C depending on moisture content o Entire core sample is crushed to a particle size of 85% passing 3.2mm. o Riffle splitting to obtain between 300 to 600g. • Sample preparation procedures for DD by Fire Assay method includes: o 1-4 hours drying at 150°C depending on moisture content o Entire core sample is crushed to 10mm o 3kg riffle split for pulverisation o Pulverise to 90% passing 75μm o Scoop 250-300g • Sample preparation protocols and sample sizes are considered appropriate for the style of mineralisation encountered and should provide representative results. • Samples analysed at ALS Laboratories using a 50g Fire Assay method (Au-AA26). • Samples analysed at SGS Laboratories using a 50g Fire Assay method (GO_FAP50V10). • Fire assay gold analysis is considered to be total gold analysis. • Samples analysed at Plutonic onsite lab using PAL method (PAL_DIBK). The Pulverising and Leach (PAL) method is not considered to be a total gold analysis, however the larger sample size still produces a representative result. • Samples were dried, crushed and pulverised prior to analysis. • Certified Reference Material (CRM’s) were submitted every 20 samples. CRM’s are of similar grade tenor to those expected grades in the sampling and were selected based on their grade range and mineralogical properties with an emphasis on sulphide ores. • Blanks are inserted every 100 samples. • Field duplicates were inserted every 20 samples in the RC drilling. A mix of Field duplicates and crush duplicates were inserted in the DD drilling, at a combined 1 in every 20 sample rate. • Crush sizing analysis is conducted randomly by the Laboratory as part of their QC process. Pulp residues are expected to have 90% passing ≤75μm. This data is monitored by the Laboratory Supervisor. Grind times can be lengthened accordingly. • Current procedures dictate a process of validation and checking of laboratory results when data is returned by the laboratory as it is loaded into the independently managed Quest database. A standard set of plots and checks are undertaken, and if results fall outside of the expected limits, then re-assaying is requested. QAQC reports are generated by the database administrator and documented from automated routines out of the database. • RC and diamond drilling data has been verified by the geologist first and then the Database Administrator before importing into the main Quest database (proprietary database system). • RC and DD logging is completed electronically on laptops. Database protocols and rules are applied upon data entry. • All drill data within site databases are regularly validated using both internal database systems and external validation tools. • All drill collars have been accurately located using DGPS. • Downhole survey data is collected using an Axis Mining Technology Champ North Seeking Gyro tool. Surveys are undertaken on 10m intervals as the tool is removed from the drillholes once the drillhole is completed. • Downhole surveys are visually inspected for anomalous changes in drill trace, (i.e does the drillhole apparently bend inordinately). • Drilling completed to date within the Inferred portion of the MRE is at a nominal 60m x 60m drill intercept spacing. • Comprehensive RC/DD infill drilling has been completed at a nominal 30m x 30m drill intercept spacing to confirm the grade continuity and allow conversion of a large part of the Inferred MRE to the Indicated category. • The drill spacing for the broader drilling outside of the current MRE is wide, ranging from 100m to 500m and should be considered exploratory in nature. • The purpose of the step out drilling program using nominal 200m and 500m spaced drillholes is to test for extensions to the mineralised zones and to define the extents of the mineralised system. • Sample compositing has only been used in the RC pre-collars through the granite cover rocks. • The orientation of a majority of the drilling is approximately perpendicular to the strike and dip of the mineralisation and is unlikely to have introduced any sampling bias. • Certain drillholes may have been drilled parallel to key structures, but density of drilling and drilling on other orientations has allowed detailed geological modelling of these structures and hence any
8
Criteria
Commentary sampling bias in a single drillhole has been removed.
Sample security
• • •
• • • Audits or reviews
• •
The chain of custody is managed by Catalyst employees and contractors. Geologists are responsible for marking the sample intervals and placement of Blanks and CRM’s within the sample lot. The Project Geologist and Senior Geologist complete quality control checks on the GC drilling data daily. Field Staff are primarily responsible for sampling of core, generating the sample numbers for core submission, creating a sample submission sheet, selecting and recording the CRM’s to be sent to the laboratory and the transportation of the samples to the laboratory. Samples are tracked during shipping. Once a drillhole has been sampled, the sample intervals and checked geology documents are uploaded into the Quest database system managed by EarthSQL. The independent Database Administrator (DBA) merges the validated drilling data with the certified laboratory assay files where validation routines for QAQC are completed before database exports and reports are issued. Catalyst samples have been stored on site and delivered to the ALS assay laboratory in Perth by a Contracted Transport Company. Consignment notes have been used to track the samples. Operator sample security is assumed to be consistent and adequate. No audit or reviews of sampling techniques have been undertaken however the data is managed by company geologist who has internal checks/protocols in place for all QA/QC. Historical reviews of the database for the Trident area have been examined previously and a proportion of drillholes compared to original data sources and found to be consistent wherever checked.
Section 2 Reporting of Exploration Results Trident Deposit (Criteria listed in the preceding section also apply to this section.) Criteria Commentary Mineral • Located in the Marymia - Plutonic Greenstone Belt ~218 km northeast of Meekatharra in the tenement and Midwest mining district in WA Land tenure • Trident is located in M52/217 – a granted Mining tenement in good standing. status • The tenement predates Native title interests but is covered by the Gingirana Native Title claim. • The tenement is 100% owned by Vango Mining Limited and subsidiary Dampier (Plutonic) Pty Ltd. • Gold production will be subject to a 2.5% government royalty. Exploration done • Comprehensive drilling of the deposit was first undertaken by Resolute Limited from 1995 to 1998 by other parties completing approximately 263 RC and 37 DD holes. • From 1999 Homestake and then later Barrick Gold (2002) completed numerous drilling campaigns at Trident. • Dampier Gold completed RC and DD programs at Trident from 2012 until 2014 when Vango Mining took over the project completing 6 Diamond drillholes for 946 metres plus three RC drillholes for 747 metres. • Catalyst consolidated the belt in 2023 following the successful acquisition of Vango Mining and the merger with Superior Gold Inc. this was followed by more diamond drilling, completed in 2023. • In 2024 an RC program was completed which has been included in this MRE. Geology
• •
• • •
ASX:CYL
Gold mineralisation at Trident is orogenic, hosted within a sheared contact zone in ultramafic rocks. Shallow plunging high grade ‘shoots’ of mineralisation are associated with flexures in the mineralised host shear zones combined with steeply dipping intersecting structures. The mineralisation consists of multiple stacked zones, with the main mineralised domain extending along a northeast/southwest strike for 1,100m. The system dips at 30˚ degrees towards 330˚ and extends down dip for at least 1,000m and remains open at depth. Mineralised zones can vary in width from 0.6m up to 15m with an average thickness of around 4.5m. The higher grade zones are focussed along north-south structures and multiple north-east trending shoots and at the interaction points of these two dominant trends. The orientation of mineralisation can be variable particularly where cross-cutting structures are intersected. These inflexion points are likely dilation zones which can host thicker and higher grade mineralisation intersections. An overthrust granite package forms the barren hangingwall to the mineralisation hosted within the
9
Criteria • Drill hole Information Data aggregation methods Relationship between mineralisation widths and intercept lengths Diagrams
•
Balanced reporting Other substantive exploration data Further work
•
•
•
• •
Commentary sheared ultramafic host rock package. The mineralised zones are characterised by biotite-phlogopite alteration with a sulphide assemblage of pyrite-pyrrhotite-chalcopyrite-arsenopyrite. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately.
As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. No additional exploration data is included in this release. Resource definition, infill and extensional drilling programs are ongoing, and will continue in line with mine development requirements.
Section 3 Estimation and Reporting of Mineral Resources Trident Deposit (Criteria listed in section 1, and where relevant in section 2, also apply to this section.) Criteria Database integrity
Commentary • • •
• •
Site visits
•
Geological interpretation
•
• • • •
ASX:CYL
The Catalyst drillhole database is managed by a third party consultant EarthSQL in AcQuire software. Trident data has been exported to MS Access and audited before estimation. Various validation checks in GEOVIA Surpac™ and Seequent Leapfrog Geo™ 3D software and data queries in MS Access were undertaken such as overlapping samples, duplicate entries, missing data, sample length exceeding hole length, unusual assay values and a review of below detection limit samples. A visual examination of the data was also completed to check for erroneous downhole surveys. The data validation process identified no major drill hole data issues that would materially affect the MRE outcomes. Database checks included the following: o Checking for duplicate drillhole names and duplicate coordinates in the collar table. o Checking for missing drillholes in the collar, survey, assay and geology tables based on drillhole names. o Checking for survey inconsistencies including dips and azimuths <0˚, dips >90˚, azimuths >360˚ and negative depth values. The Competent Person undertakes frequent site visits to the Plutonic Gold Operation and associated Marymia tenements. Gold mineralisation at Trident is orogenic, hosted within a sheared contact zone in ultramafic rocks. Shallow plunging high grade ‘shoots’ of mineralisation are associated with flexures in the mineralised host shear zones combined with steeply dipping intersecting structures. The mineralisation consists of multiple stacked zones, with the main mineralised domain extending along a northeast/southwest strike for 1,200m. The system dips at 30˚ degrees towards 330˚ and extends down-dip for up to 1,000m and has been mostly closed out at depth. Mineralised zones can vary in width from 0.6m up to 15m with an average thickness of around 4.5m. A total of 111,001m of drilling from 230 diamond/diamond tails and 110 RC drillholes were available for interpretation and estimation of the MRE. This included 72 RC grade control holes for 11,221m to an average depth of 155m. Drilling density at Trident is variable, ranging from <20m x 20m close to surface, to >40m x 40m at depth. Mineralisation domains have been interpreted primarily using geological logging and downhole geological contacts, based on lithology, gold grade distribution, major fault location and geometry. Interpretation of the mineralisation has been undertaken in Seequent Leapfrog Geo™ software using all available drillholes. Intercepts correlating to gold mineralisation and underpinned by strike continuity
10
Criteria
Commentary have been independently identified and manually selected within Seequent Leapfrog Geo ™ prior to creation of implicit volume models. • The geological model is comprised of one main domain (5000) and a smaller sub-vertical domain (1500) located close to the Top of Fresh Rock. Additionally, smaller discontinuous hanging-wall domains (5100 and 5200) and smaller foot-wall domains (4800 and 4900) are located either side of the Main Lode (5000). • The mineralisation shallowly dips to the northwest with a thickness of 1m to 15 m. Mineralisation has been delineated at a nominal 0.5g/t Au cut-off. • Catalyst considers confidence is moderate to high in the geological interpretation and continuity of the mineralisation domains.
Dimensions
•
Mineralisation extends over a strike length of approximately 1,200 m and down-dip for up to 1,000 m.
Estimation and modelling techniques
• •
Interpretations used all available drillhole data. The domain intercepts have been imported into the MS Access database and prepared for compositing in Surpac. No deleterious elements have been estimated or assumed. Only gold grade has been estimated. The model has been validated by comparing statistics of the estimated blocks against the composited sample data, and visual examination of the of the block grades versus the assay data in section and swath plots.
• • •
CIK Methodology • All drillhole assay data has been composited to 1m downhole using the best fit algorithm in Surpac. • The moderate to high grade variability and lack of spatial continuity of high grades requires a non-linear approach to deal with the high grades during estimation. A traditional approach of physical domaining, assay cutting, and linear estimation (IDW or OK) is considered inadequate in dealing with this complexity. • The estimation method combines Categorical Indicator Kriging (CIK) to define broad estimation domains, together with applying distance limiting at chosen grade thresholds to restrict the influence of the high-grade values during grade interpolation. • Prior to estimation, a reference surface for the domain has been exported from Leapfrog. This is calculated as the best fit surface using the hanging wall and footwall surfaces. • The reference surface has been imported into Surpac and a dip and dip-direction value of each triangle facets is imported into the Surpac block model to provide information for dynamic search and variogram model orientation during interpolation. Dynamic estimation has been applied for estimating the CIK indicators and gold grades. • Two Categorical Indicator values have been determined: o A low-grade (LG) indicator was assigned to differentiate between background ‘waste’ and lowtenor mineralisation. o A high-grade (HG) indicator was assigned to define broad areas of consistent higher-tenor mineralisation. • The indicators applied for each domain are summarised below:
• •
•
ASX:CYL
Variograms were generated for the LG and HG indicators for Domain 1500, 5000, and 5100 and then applied to the other domains in the respective group (i.e. shallow dipping and steep dipping). The CIK indicators have been estimated using Ordinary Kriging into a finely gridded block model with block dimensions of 1.25m x 1.25m x 1.25m. The small block size for the indicator process is beneficial for creating categorical sub-domains at a resolution which can be used to accurately back-flag composite data. Three categorical sub-domains have been generated: low-grade (LG), medium-grade (MG) and high-
11
Criteria
Commentary grade (HG) areas. The HG sub-domain has been based on an indicator probability threshold of 0.4 and the LG sub-domain has been based on an indicator probability threshold of 0.6. The MG sub-domain is assigned to blocks that do not satisfy either the HG or LG sub-domain criteria. • The three categorical block model sub-domains (HG, MG and LG) have been used to ‘back-flag’ the 1m composites, thus creating a separate composite file for each sub-domain. • Assay top-cuts have been applied to the sub-domain composite files as follows:
•
•
• • •
•
• Moisture
•
Cut-off parameters
• •
ASX:CYL
The assay top-cuts are generally above the 99th percentile of the distribution and have been aimed at globally limiting extreme values only. In this estimation methodology, top-cuts are not used as the primary tool to control metal risk. The use of grade thresholds and distance limiting is considered a more objective and influential method in controlling metal risk, while better reflecting the actual localised occurrence of discontinuous high-grade gold mineralisation. Grade thresholds for distance limiting have been determined from log-probability plots and detailed review of the spatial locations of the gold grades. The final applied grade distance limits applied were:
Prior to grade estimation, sub-domain codes from the 1.25m resolution block model have been imported into a Y=2.5m x X=2.5m x 2.5m resolution block model and the proportion of LG, MG and HG is calculated for each 2.5m x 2.5m x 2.5m block. The choice of a 2.5m x 2.5m x 2.5m block size reflects the likely mining selectivity achievable for an underground mining scenario. Grade estimation for the LG, MG and HG sub-domains has been undertaken in Surpac software using Ordinary Kriging (OK) with grade threshold distance limiting. Search routines and variogram orientations are drawn from the pre-populated dynamic search information recorded in each block (dynamic anisotropy). Final block grades at a 2.5m x 2.5m x 2.5m block resolution have been calculated by weighting the estimated grades for each sub-domain by the relevant domain proportion. The parent estimation block size is 2.5m x 2.5m x 2.5m. A minimum of 2 and maximum of 12 composites have been used for each sub-domain estimate per block. It is possible that up to 36 composites can be used to estimate a parent block where there is a proportion of all three sub-domains present. A single-pass estimation strategy has been used across all domains, whereby a search range of 100m by 100m by 50m and minimum 2 to maximum 12 composites has been utilised to estimate a grade. Octant restrictions have not been used. All estimations have been carried out on a ‘dry’ basis. The Trident Underground Mineral Resources is reported at a cut-off grade of 2.0 g/t Au. The cut-off grade has been derived from current mining and processing costs and metallurgical parameters at the nearby Plutonic Underground Mine. Inputs into the cut-off grade calculation include: o Average Mining Cost = AUD$161/t o Processing and Other Costs = AUD$24/t ore o Metallurgical Recovery = 83.5% o Royalties = 2.5%
12
Criteria Mining factors or assumptions
Commentary o Gold Price = AUD$3,500/oz • •
Metallurgical factors or assumptions Environmental factors or assumptions
•
Bulk density
•
• • •
• Classification
•
Audits or reviews
• •
Discussion of relative accuracy/ confidence
• • •
The Trident Underground Mineral Resources is reported to a maximum vertical depth of 550m below the topographic surface using a gold price of AUD$3,500/oz. Mining selectivity is assumed to include a minimum mining width of 1.5m, minimum stope length of 5m, and a minimum stope height of 5m. It is assumed the material will be trucked and processed at the Plutonic Gold Plant. Recovery factors are assigned based on lab test work. No metallurgical assumptions have been built or applied to the resource model. A conventional storage facility is used for the process plant tailings. The small amount of waste rock is stored in a traditional waste rock landform ‘waste dump’. Due to low sulphide content and the presence of carbonate alteration the potential for acid content is considered low. Density has been assigned to the resource models using interpreted weathering surfaces determined from drill hole logging. The entire Trident UG Mineral Resource is located below the Top of Fresh Rock (TOFR) and all blocks have been assigned a density of 2.9 kg/m3. Factors considered when classifying the model include: o The portions of the Trident MRE classified as Indicated have been flagged in areas of the block model where the average distance to the nearest informing composited drill intercept was nominally 30m or closer. o The portions of the MRE classified as Inferred typically represent minor lodes or lower grade portions of the larger domains where geological continuity is present but not consistently confirmed by 30m spaced composited drill data. The extrapolation of the resource was limited to a maximum of 60m past the last sample point. o Further considerations of resource classification include; data type and quality (drilling type, drilling orientations, down hole surveys, sampling and assaying methods); geological mapping and understanding. The Mineral Resource estimate appropriately reflects the view of the Competent Person. The geological interpretation, estimation parameters and validation of the resource model was peer reviewed by Catalyst staff. No external reviews of the resource estimate had been carried out at the time of writing. The relative accuracy of the Mineral Resource estimate is reflected in the reporting of the Mineral Resource as per the guidelines of the 2012 JORC Code. The statement relates to the global estimates of tonnes and grade.
Section 4 Estimation and Reporting of Ore Reserves Trident Reserve (Criteria listed in section 1, and where relevant in sections 2 and 3, also apply to this section.) Criteria Commentary Mineral Resource estimate for conversion to Ore Reserves
•
Site visits
•
•
• Study status
ASX:CYL
•
The Mineral Resource Estimate (MRE) used for the Trident underground Ore Reserve is described in Section 3. Only the Indicated portion of the Mineral Resources are reported, and they are inclusive of the Ore Reserve. The Ore Reserves are a subset of the MRE and are spatially contained within the MRE. The Competent person is a full-time employee of Catalyst Metals and has conducted regular visits to the Plutonic Mine Site and Trident, the planned processing and mining locations. The Competent Person has no concerns arising from these visits that would impact the Ore Reserve viability The underground Ore Reserve has been generated from a feasibility study. The study has had both internal Catalyst personnel and external consultants formulate the mine plan with appropriate geotechnical, hydrological, equipment, metallurgical and mining method information.
13
• • •
Cut-off parameters
•
•
Mining factors or assumptions
• • •
• • • • • •
• Metallurgical factors or assumptions
• •
• • • Environmental
ASX:CYL
•
Costs have been derived from Catalyst’s existing Plutonic Underground Mine, and where
tailored processes, mining methods or equipment has been proposed for Trident,
appropriate level of investigation has occurred, and recent vendor quotations utilised.
Material modifying factors are based on the proposed underground mining methods and
geotechnical assessment, in addition to industry standards and current performance at
Catalyst’s Plutonic mine which employs similar mining methods.
The Feasibility study demonstrates that the mine plan is technically achievable and
economically viable taking into consideration the current known material modifying
factors.
The cut-off grade applied to the Ore Reserve estimate is defined as the g/t gold grade at
which the revenue generated breaks even on a $A value per tonne of ore after
consideration of all costs (mining, processing, general and administration), metallurgical
recoveries, sustaining capital, transport costs and royalties.
Individual stope designs are based on a break-even cut-off grade of 2.0 g/t and then mining
areas are analysed globally to ensure they are economically viable to account for total
mining access, extraction, processing, and all other relevant costs.
The Ore Reserves estimate is based on long-hole stoping with paste fill mining
methodology. The modifying factors are based on the geotechnical inputs and assumed
mining methods.
The Ore Reserves estimate is generated by designing stope shapes using Deswik’s Stope
Optimiser (DSO). A development layout was then designed to align with the stope shapes
and scheduled in Deswik scheduling software.
MSO input parameters include a 2.0 g/t Au cut-off, minimum mining width of 3.0 m, 1.0 m
hanging wall dilution and 0.5 m footwall dilution in the flatter lying areas of the orebody
(<40 degrees), and 0.5 m hanging wall dilution and 0.5 m footwall dilution in steeper
dipping areas (>40 degrees), of the orebody. Additional dilution of 5% was applied to all
paste filled stopes. Development had no dilution applied and 100% mining recovery
assumed.
Mining recovery of 92.5% was applied in all stopes. These mining recovery factors allow for
bogging losses typically realised in longhole stoping.
Post application of all recovery and dilution factors, stopes below 2.0 g/t were removed
from the mine plan.
A minimum footwall dip angle of 40 degrees was utilised.
Any Unclassified or Inferred Mineral Resources captured within the mine plan have a zero
grade assigned and the material treated as waste.
Trident mining method specific infrastructure includes the provision of a paste fill plant for
backfilling stope voids and a surface batch plant for cement supply.
Other key infrastructure that is required for the underground mining operation includes
power generation and reticulation, primary ventilation infrastructure, office buildings,
maintenance workshops, explosive magazines, water reticulation and storage, ore
stockpiles and waste dumps, evaporation ponds, and other facilities.
All of the stated infrastructure has been allowed for in costings.
The Ore Reserve will be treated at the established Plutonic processing facility. The facility is
a conventional crushing, gravity circuit, grind, and CIL (carbon in leach) plant and is
appropriate for the extraction of gold from free milling mineralisation.
Plant performance for the past five years indicates reasonable performance, with
recoveries ranging from 76% to 90%, and an average recovery in 2023 of 84%. Metallurgical
recoveries used to generate the Mineral Reserves were based on site production data and
detailed metallurgical testing to an appropriate standard.
Catalyst has undertaken DFS-level testwork. The aim of the program was to define the
performance of the Trident Underground ore through the established Plutonic 1.8 Mtpa
gravity/CIL plant.
The test work indicated that the implemented 83.5% metallurgical recovery is both prudent
and auditable. The recovery is reflective of the current Plutonic processing plant’s capacity,
and grind sizing of 75 µm.
Concentrations of silver is low. Concentrations of deleterious elements have been noted as
low across different ore types including fresh, transitional and weathered ore.
Trident has all required mining approvals and permits in place
14
Infrastructure
• • • •
Costs
• •
•
Processing plant and tailings storage facilities are located at Plutonic and will be utilised for the processing of Trident ore and deposition of resulting tailings. Camp, accommodation, and air strip facilities are also located at Plutonic and will be utilised by the Trident workforce. Power for the Trident mine will be supplied from diesel gensets, and life-of-mine requirements were modelled within the Feasibility Study Mine water will be supplied from the Mareast pit and life-of-mine requirements were modelled within the Feasibility Study Capital and operating costs underlying assumptions are to a Feasibility level. Where available and appropriate, costs have been derived from Plutonic’s recent actual costs for underground mining. Components of the underground mining methodologies employed at Plutonic are similar to those proposed at Trident and deemed suitable as a source for cost estimation. Where Trident is utilising different mining techniques and methodologies, costs have been built up from recent supplier and manufacturer quotations.
Revenue factors
•
For the Ore Reserve a A$4,500/oz sale price was used to assess economic viability.
Market assessment
•
Gold metal is a freely and widely traded commodity with a transparent mechanism for setting prices and for sale of gold produced. Catalyst has not conducted any studies or analyses such as commodity price projections, product valuations, market entry strategies, or product specification requirements.
• Economic
• • •
Social
• •
Other
• •
Classification
The Trident operation generates positive NPV using the afore mentioned costs, revenue factors and discount rate of 7%. Sensitivity analysis was conducted on gold price, total costs, metallurgical recovery, mined grade and mined tonnes and still generated a positive NPV. The Trident NPV is most sensitive to gold price, mining cost and metallurgical recovery. Catalyst has good relationships with neighbouring stakeholders, including engagement with the local pastoralists and the traditional owners. Granted mining leases cover all the proposed mining and processing assets. Contracts are in place at Plutonic for critical supplies. Trident is expected to leverage off Plutonic’s supply chain and procurement. No other matters, other than disclosed in this Table 1 are considered material to the estimation and reporting of this Ore Reserve.
•
The Ore Reserves classification reflects the Competent Person’s view of the deposit. Only Probable reserves have been declared and are based on Indicated Resources following consideration of modifying factors. No Probable Ore Reserves are derived from Measured Resources.
Audits or reviews
•
No external review has been conducted on the Ore Reserves.
Discussion of relative accuracy/ confidence
•
The accuracy of the estimates within this Ore Reserve is mostly determined by the order of accuracy associated with the Mineral Resource estimate, the geotechnical inputs and the costs used collectively in the respective levels of technical studies described previously in this section. The Ore Reserve has been completed to a feasibility study level of assessment The Ore Reserve is a global estimate
•
• •
ASX:CYL
15
Figure 2: Plutonic Gold Belt showing location of Trident relative to the Plutonic processing facility
16
on Catalyst’s path to 2Moz Reserve • Keillor (formerly K2) is an operating gold mine located 40km from Plutonic’s processing plant • Prior to 2026, little to no drilling had been completed at Keillor in the past 25 years • The previously reported Resource was 81koz at 3.6g/t Au, reflecting the limited drilling • Catalyst has been drilling Keillor over this calendar year; as a result, the Resource has increased to 3.2Mt at 3.0g/t Au for 307koz, a ~280% increase • First ore from Keillor was mined in the June 2026 quarter. Ramp-up of the mine is progressing well and is expected to continue for the remainder of CY2026 • Since September, Catalyst has been drilling at Keillor, Cinnamon, Trident and Old Highway
- all high-grade ore sources and all expected to contribute to growing Catalyst’s Reserves to 2Moz • An updated Reserve at Keillor will follow in the coming weeks and Catalyst expects the initial three year mine life to extend • Keillor is the third of six mines to be developed as part of Catalyst’s plan to double annual gold production to ±200koz3. Multiple ore sources will allow stockpiles to be built ahead of the processing plant, creating greater flexibility, contingency and lowering operating risk of the long-term plan • In September 2025, Catalyst released general 10-year guidance. Since then, Catalyst has, understandably, seen changes to permitting timelines, Reserves/Resources, geological understanding, operational delays and processing capacities • As a consequence, the September 2025 guidance should be seen as a general guide as to the management’s long-term plans for Plutonic Belt’s future production. Future guidance will update to reflect new changes being observed Catalyst Metals Limited (Catalyst or the Company) (ASX:CYL) is pleased to provide an update of mining progress and an updated Mineral Resource Estimate for the Keillor underground and open pit gold deposit, located on the Plutonic Gold Belt in Western Australia. The updated Mineral Resource estimate is as follows: Classification
Tonnes (Mt)
Grade (g/t Au)
Ounces (Koz)
Open pit Underground Total
0.5 2.7 3.2
1.3 3.3 3.0
21 285 307
MRE: 4.5Moz at 3.3g/t Au ORE: 1.5Moz at 2.6g/t Au Corporate Details ASX: CYL E:investors@catalystmetals. com.au W:catalystmetals.com.au
ASX:CYL
Note 1: MRE includes Indicated Resources of 32.9Mt at 3.3g/t for 3.4Moz and Inferred Resources of 9Mt at 2.7g/t for 0.8Moz. ORE includes probable Reserves of 18.1Mt at 2.6g/t for 1.5Moz. Note 2: Refer to ASX announcement 14 October 2025 “Annual Report to shareholders.. Note 3: Refer to ASX announcement 10 September 2025 “Plutonic Belt Reserves double, supporting growth plans
1
Catalyst’s Managing Director & CEO, James Champion de Crespigny, commented: “Catalyst has long targeted ±2Moz of Reserves across the Plutonic Gold Belt. Achieving such a target would provide a long-term foundation upon which to build reliable cashflows for the Catalyst business. With this success at Keillor, and recently announced success at Cinnamon, achieving this target is looking increasingly likely. Furthermore, the potential extension of the life of Keillor, an already operating mine, provides high grade, low capital intensity, high margin ounces and gives further support for the stated objective of a 10 year mine plan targeting ±200koz a year of annual production.” Mineral Resource update As with much of the Plutonic Gold Belt, a fragmented ownership history meant little drilling had taken place at Keillor in the last 25 years. The previous Mineral Resource of 81koz at 3.6g/t Au and Ore Reserve of 20koz at 4.3g/t Au were largely informed by drilling completed before 2000. Catalyst’s drilling began in late 2025 and has been focussed on growing the Resource and Reserve, and mine life of Keillor beyond its initial three years. Dedicated drill platforms have enabled 30,000m of underground drilling to inform the updated 2026 MRE as well as de-risk the immediate mine plan. Today Keillor’s Resource stands at 307koz, representing an increase of ~280%. Importantly, the indicated portion of the underground Resource (the focus of current mining operations) has increased by ~500% to 187koz. A Reserve update is currently underway and is expected to result in an extended life of mine plan beyond three years. As part of this drilling program, a number of deeper holes sought to test for extensions at depth. Intercepts such as 7m at 5.1g.t Au, 350m beneath the existing West Lode, and 4m at 10g/t Au, 180m beneath the East Lode provide indications that Keillor has the potential to extend at depth (refer to Figure 2). Table 1: Keillor Mineral Resource Estimate (with 2025 MRE comparison) 2025 MRE
Open pit
Underground
Total
ASX:CYL
2026 MRE
% change
Classification
Tonnes (Mt)
Grade (g/t Au)
Ounces (Koz)
Tonnes (Mt)
Grade (g/t Au)
Ounces (Koz)
Indicated Inferred Sub-Total Indicated Inferred Sub-Total Indicated Inferred Total
0.2 0.5 0.7 0.2 0.5 0.7
4.2 3.4 3.6 4.2 3.4 3.6
31 49 81 31 49 81
0.5 0.1 0.5 1.5 1.6 2.7 2.0 1.2 3.2
1.3 0.9 1.3 3.8 2.7 3.3 3.2 2.6 3.0
20 1 21 187 98 285 207 99 307
503% 100% 250% 567% 100% 280%
2
Figure 1 – Keillor plan view showing [central, main and east lodes]. Mining is currently focussed on the Main Lode
Figure 2 – Keillor long section showing Resource. Intercepts at depth and along strike indicate the potential for further Resource growth
ASX:CYL
3
Mining update Mining at Keillor commenced in the June 2026 quarter. First stoping ore was transported and processed at the central Plutonic processing plant in the quarter. Keillor was the third mine developed by Catalyst on the Plutonic Gold Belt in 24 months. It is considered an important source of higher-grade ore, providing a low-risk lift to Plutonic Belt production. Ramp-up of the mine is progressing in line with plans. The current focus of mining is on the main lode and west lode (refer Figure 1) with multiple mining fronts having been established. Grade control drilling of the first 15 months of production has been completed. Catalyst considers this initial investment in mine development and grade control drilling important. It provides flexibility to the planning and operations teams during ramp up and will set the mine up for consistent, stable operations. Further Resource development drilling is planned at the east lode in the coming months. Continuous high grade in both the west and main lode has prompted the mine to introduce a short-term contractual paste plant operation. This will maximise extraction of the high-grade resource, whilst providing long term stability. An example of this grade continuity is shown in Figure 3, illustrating face mapping and sampling of the Main Lode 500RL. Recent metallurgical test works confirms the free milling nature of the Keillor ore, with a +92% recovery and +40% gravity recovery. Development capital for Keillor is now largely spent. Surface infrastructure including offices, workshops and power station are established. Catalyst expects the ongoing capital requirements for Keillor will be limited to mine development.
Figure 3 – Face mapping and sampling of Main Lode 500 level – the first level beneath previously mined open pit
ASX:CYL
4
Keillor Deposit Keillor (formerly K2) is situated 40km north-east of the underutilised Plutonic processing plant. Keillor has an underground Resource of 285koz at 3.3g/t Au. The deposit was discovered in the late 1980’s by Resolute’s exploration team led by geologist Brett Keillor. 963kt of ore at 4.0g/t Au for 124koz of gold was mined from the Keillor open pit in the 1990’s 3. Following open pit mining, in 1997 Resolute Mining Ltd established a decline to commence underground mining, however the mine was placed on care and maintenance prior to any stope production commencing. Prior to Catalyst’s ownership, no mining or development activity had occurred at Keillor for 27 years. A fragmented ownership history and a long running legal dispute over the Keillor deposit resulted in limited exploration since the 1990’s. In November 2025, Catalyst settled all legal issues allowing Catalyst to accelerate development activities at Keillor. Keillor is the third of six mines to be developed as part of Catalyst’s plan to increase long-term annual gold production to ±200koz. It is a higher-grade ore source and expected to lift the overall blended grade of ore processed at Plutonic’s central processing plant. Steady state production is expected to be ~20koz of gold.
MINERAL RESOURCE ESTIMATE (Keillor) Material information summary as required under ASX Listing Rule 5.8 and JORC Code (2012) reporting guidelines. Mineral Resource Statement The Mineral Resource Statement for the Keillor Underground and Open Pit Mineral Resource Estimate (MRE) has been prepared during August 2026 and is reported according to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Code’) 2012 edition. The Mineral Resource Estimate incorporates all drilling data completed by Catalyst since the previous MRE (May 2024) to the current data cut-off date of 21 August 2026. A total of 52,790 m of surface drilling from 68 diamond only/ diamond tails and 119 RC only holes form the basis of this Mineral Resource update. Additional underground data comprised 280 DD holes (30,181 m), 65 sludge holes (578 m), and 1,786 m of face samples. The current vertical extent of the Keillor Underground Mineral Resource is approximately 380m (to 270mRL) from the current topographic surface at 650mRL. In the opinion of Catalyst, the resource evaluation reported herein is a reasonable representation of the global gold Mineral Resources within the Keillor deposit, based on sampling data from RC, RCD, RC/DD, DD drilling and underground faces available as of 21 August 2026. The Keillor MRE has been undertaken with a focus on delineating areas of the MRE with Reasonable Prospects for Eventual Economic Extraction (RPEEE) by open pit and underground mining methods. The underground component of the MRE has been reported at a 1.5 g/t Au cut-off within transitional and fresh rock to a maximum vertical depth of 380m below the topographic surface. The open pit portion has been reported at a 0.5 g/t Au within an optimised pit shell based on oxide material only using a gold price of AUD$6,000. The total MRE consists of Indicated and Inferred Mineral Resources are outlined in Table 1 below. No Measured Mineral Resources have been reported at this stage of the project. 3 Sourced from internal records
ASX:CYL
5
Reporting Cutoff
Deposit
Indicated
Inferred
Total
Tonnes
Grade
Gold
Tonnes
Grade
Gold
Tonnes
Grade
Gold
(Mt)
(g/t Au)
(koz)
(Mt)
(g/t Au)
(koz)
(Mt)
(g/t Au)
(koz)
Keillor Underground
1.5
1.5
3.8
187
1.1
2.7
98
2.7
3.3
285
Keillor Open Pit
0.5
0.5
1.3
20
0.05
0.9
1
0.5
1.3
21
2.0
3.2
207
1.2
2.6
99
3.2
3.0
307
Total
Table 1 – Keillor MRE (Open Pit = 0.5 g/t Au cut-off, Underground = 1.5 g/t Au cut-off) Notes:
- Keillor Open Pit reported inside an optimised pit shell using a gold price of AUD$6,000/oz
- Numbers may not add up due to rounding Drilling Techniques The drillhole Quest database, managed by EarthSQL, has been compiled from information collected when the Project was under ownership of numerous companies including: • • • • • •
Catalyst Metals (2023 to current), Vango (2014 to 2023), Dampier Gold (2012 to 2014), Barrick Gold (2001 to 2012), Homestake (1999 to 2001), Resolute (1995 to 1998).
All drilling data used in this Mineral Resource Estimate has been sourced from surface Diamond (DD) and Reverse Circulation (RC) drilling methods. In addition, recent underground data has been incorporated which included DD holes, sludge holes and face samples. RC drilling has been conducted utilizing a 5.75 inch” face sampling bit. Surface and underground Diamond drilling utilises NQ core with a diameter of 47.6 mm. Sludge drilling is performed with an underground production drill rig. It is an open hole drilling method using water as the flushing medium, with a 45mm or 102mm hole diameter. Sludge holes are drilled at a sufficient angle (>25 deg) to ensure adequate hole flushing and chip drainage to minimise effects of sample smearing between metre intervals. Probe holes range from 3 m to 25 m in length, depending on whether a Jumbo or Long-hole configuration is used. Underground DD and sludge holes were drilled as ‘fans’ from suitable drill platforms and intersect the lodes at variable orientations. Collar locations are picked up regularly by site surveyors. Downhole surveys are completed using a Devi-Gyro survey instrument every 3 metres. Catalyst surface drillholes have been routinely pegged using a Differential Global Positioning System (DGPS) handheld unit and marked with wooden pegs. Once completed, the collar position has been re-surveyed using the same DGPS unit to an accuracy of +/- 20mm. The surveyed co-ordinates replace the planned coordinates in the database. Downhole survey data was collected using an Axis Mining Technology Champ North Seeking Gyro tool. Surveys are undertaken on 10m intervals as the tool is removed from the drillholes once the drillhole is completed. All DD core is orientated using a Reflex ACT device and detailed structural measurements and logging is carried out.
ASX:CYL
6
Historical Drilling Extensive previous work was completed by Resolute Mining, Homestake Gold, Battle Mountain Australia, Barrick Mining and Dampier Gold. Previous metallurgical and resource work was completed by Resolute Mining, Barrick Mining and Dampier Gold. The quality of historical drilling information is varied, but all of the above companies used high quality methodology at the time. Catalyst consolidated the belt in 2023 following the successful acquisition of Vango Mining and the merger with Superior Gold Inc. Vango (2014 to 2023) Planned drillhole collars were pegged with a DGPS and marked with wooden pegs hammered into the ground and flagged with high visibility flagging tape. On completion of drilling, the actual drillhole collar position was measured by survey staff using a DGPS working off a network control of survey stations, to an accuracy of 20mm. These surveyed coordinates replaced the planned coordinates in the geological database. All reported coordinates were referenced to grid system MGA_GDA94 Zone 50. The topography is relatively flat at the location of drilling. The survey station network met the Mine Safety and Inspection Regulations 1995, section 3.49, where the accuracy of a survey must be not less than 1:5000. The collar locations of historic drillholes were validated from geological logging information from annual reports and the original database when Vango acquired the tenure. Recent (2023) downhole survey data was collected by Westdrill using an Axis Mining Technology Champ North Seeking Gyro tool. Surveys were conducted at end-of-hole (EOH) using a north-seeking gyroscope with a reading collected every 5m. If early drilling found strong drillhole deviation, surveys were conducted during drilling (collar, 30m, 60m, 90m etc to EOH). Survey deviation was monitored by the geologist onsite, with major deviation discussed with the driller at the time. Recent Vango RC drilling was conducted utilizing 5.75 inch” face sampling bit. Diamond drilling was conducted utilising NQ2 core. Core was orientated by downhole spear methodology. Pre-Vango (1995 – 2014) Previous downhole survey data was collected using a REFLEX gyro tool and historically with Eastman camera survey tools, with follow-up downhole surveys carried out by Surtron using gyroscopic survey equipment. Historical downhole surveys were reviewed and verified where information was available through direct comparison within the database. Historical Diamond drillholes utilised PQ3, HQ3 or NQ2 core diameter, while RC drilling utilised a 5.5” drill bit.
ASX:CYL
7
Sampling and Sub-Sampling Techniques Catalyst has undertaken both surface RC and DD drilling at the Keillor deposit since acquiring the project. RC drillholes and RC pre-collars have been sampled using 3m composited samples through the overlying cover rock, collected from the original 1m cone split samples from the rig mounted cyclone. The residual material is retained on the ground near the hole. All RC composited samples were dispatched to the ALS and BV laboratories in Perth for gold fire assay analysis. Surface DD core was half-cut and sampled on 1m intervals or to geological contacts, with sample lengths varying between 0.2m to 1.6m. Whole core sampling was instigated for broken/sheared zones which could not be cut. This resolved any possible biasing issues with 1/2 core grab samples within incompetent fractured and sheared zones. Core samples were sent to several labs: the majority to ALS (Au-AA26), and the remainder to BV (Au-FA450) and the Plutonic onsite lab (PAL_DIBK). All underground NQ grade control holes (47.6mm diameter) were whole-cored sampled to streamline the core handling process. Sample lengths ranged from 0.1m to 2m. Sludge drilling used nominal sample lengths of 0.9m and 1m depending on whether a Jumbo or Long-hole configuration is used. A 3-5kg sample is captured using the ‘sludge cone’ (aluminium cylindrical cone purchased from WESTERNEX). Face channel samples were nominally chipped across the face from left to right and sub-set via geological features as appropriate. Sample lengths ranged from 0.2m to 1.5m All underground grade control samples were dispatched to the Plutonic site laboratory for analysis using PAL method (PAL_DIBK) Sample preparation procedures for the Plutonic onsite lab by PAL method (PAL_DIBK) includes: o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o A nominal 500g riffle split sample is used for PAL assaying for 1 hour leach cycle o PAL 1000 Grind Check: A minimum of 95% passing 75 μm sieve size. o Sample re-assay or duplicate samples are taken from the retained original crushed sample Sample preparation procedures for Plutonic onsite lab by Fire Assay method (FA40) includes: o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o 1-1.5kg riffle split for pulverisation o Pulverise to 85% passing 75μm o Scoop 250-300g aliquot for lead collection Fire Assay 40g charge with AAS finish Sample preparation procedures at ALS laboratory includes: o Sample sorting and drying (DRY-21). o Core sample is coarse crushed (CRU-21), RC samples not crushed. o Pulverise entire sample to a particle size of 85% passing 75µm (PUL-24). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (Au-AA26). Sample preparation procedures at BV laboratory includes: o Sample sorting and drying (PR001).
ASX:CYL
8
o o o o
Entire core sample is crushed to 10mm (PR102), RC samples not crushed. Riffle splitting to obtain between 1.2 to 3kg. Pulverising to a particle size of 90% passing 75µm (PR303). 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (FA450).
A summary of samples collected by Catalyst and used for the Resource estimate are detailed below in Table 2. Sample Type DD RC UGDD SL FS Grand Total
ALS FA50 163 570
BV FA50 531 19,969
733
20,500
Plutonic FA40 PAL 399 14,392 3,517 306 29,465 530 1,832 3,916 46,525
Grand Total 15,485 24,362 29,465 530 1,832 71,674
Table 2 – Summary of Catalyst sample types
Quality Assurance and Quality Control (QAQC) samples are included in each sample batch and are dispatched to the assaying laboratory to measure the accuracy and precision of the returned assays. QAQC samples inserted into the sample stream include: •
• • •
Certified Reference Material (CRM) were submitted at an average rate of 4% of the total primary samples. CRMs are of similar grade tenor to those expected grades in the sampling and were selected based on their grade range and mineralogical properties with an emphasis on sulphide ores. Coarse 40mm blanks were inserted at an average rate of 4% of the total primary samples RC field duplicates were inserted at an average rate of 5% of the total primary samples A mix of field duplicates (1/4 core) and coarse crush duplicates were inserted in the DD drilling, at an average rate of 3% of the total primary samples.
Crush sizing analysis is conducted randomly by the commercial laboratories as part of their QC process. Pulp residues are expected to have 90% passing ≤75μm. This data is monitored by the Laboratory Supervisor. Grind times can be lengthened accordingly. Current procedures dictate a process of validation and checking of laboratory results when the assay data is returned by the laboratory upon loading into the independently managed Quest database. A routine set of plots and checks are undertaken, and if results fall outside of the expected limits, re-assaying of failing samples is requested. QAQC reports are generated by the database administrator and documented from automated database routines. The sample preparation protocols and sample sizes are considered appropriate for the style of mineralisation encountered and should provide representative results.
ASX:CYL
9
Historical Sampling Vango (2014 to 2023) Vango RC drilling assays were collected as 1m samples split on the cyclone, using a cone splitter. Each RC sample weighed approximately 3 to 5kg. Four metre composites were collected from 4 of the 1m samples within the cover sequence and overlying granite. Vango diamond drilling samples were mostly half core with minor quarter core, NQ2 and HQ size core. This is considered to be sufficient material for a representative sample. Core samples were taken at 1m intervals or at geological boundaries, ranging between 0.8-1.25m in length. The DD drillholes were geologically logged to geological boundaries in addition to being structurally and geotechnically logged. Recovery in DD was based on the measured core returned for each 3m run. RC drilling was bagged on 1m intervals and an estimate of sample recovery made based on the size of each sample. QAQC protocols included the collection and analysis of field duplicates, the insertion of appropriate commercial standards (CRMs) and the insertion of blanks. Matrix and grade matched CRMs were submitted every 20 samples. Blanks were inserted every 20 samples. Pre-Vango (1995 – 2014) Sampling procedures earlier than 2018 are not available. Historical RC samples were collected as 4m composite spear samples. Mineralised zones were sampled at 1m intervals using a 1/8 riffle splitter. Core samples were halved using a diamond saw and sampled at 1m intervals, or to geological contacts. RC field duplicate sampling was completed by passing the bulk reject sample from the plastic bag through a riffle splitter. DD field duplicates were collected as quarter core samples and routinely submitted. Duplicate sample intervals were designated by the logging geologist. No assessment of RC chip sample recoveries was undertaken on historical data however a comprehensive historical review of sampling procedures was undertaken which indicates that standard procedures where enacted to ensure minimal sample loss. Where information on the recoveries had been recorded, they have been found to be consistent with those noted by subsequent drilling. Recovery in diamond drilling based on measured core was returned for each 3m run. Sample Analysis Methods The Pulverising and Leach (PAL) method utilised at the Plutonic onsite lab is not considered to be a total gold analysis, however the larger sample size (500g) still produced a representative and comparable result. The majority of the samples used the fire assay (50g) technique by AAS method which is considered to be a total gold analysis. For the historical drilling, gold was analysed using fire assay with a 25g to 50g charge for gold. Specific QAQC procedures for previous owners were unavailable. Although sample collection, sample preparation, sample logging and analytical techniques have varied over the Project’s history, all can be considered as industry standard at the time of drilling. The amount of QAQC data that has been collected has also varied over the Project’s history however overall is considered as being acceptable to support the MRE.
ASX:CYL
10
Regional and Local Geology The Keillor Deposit is part of the Plutonic Project located approximately 200km north-east of Meekatharra, WA, on the Three Rivers and Marymia Pastoral Leases, within the Peak Hill Mineral Field of WA (Figure 1). The Project is covered by the Peak Hill (SG 50-8) 1:250,000 Sheet and the Marymia (2847) and Three Rivers (2747) 1:100,000 sheets. Access to the Plutonic Gold Mine Camp is via the Great Northern Highway and the Plutonic Mine access road.
Figure 1 : Plutonic Regional Map Regionally, the Plutonic Gold Belt lies in the Archaean Plutonic Well Greenstone Belt, an elongate NE trending belt within the Marymia Inlier. The Marymia Inlier is an Archaean basement remnant within the Proterozoic Capricorn Orogen and comprises two mineralised greenstone belts (Plutonic Well and Baumgarten Greenstone Belts), with surrounding granite and gneissic complexes. The Capricorn Orogen is situated between the Pilbara and Yilgarn cratons and is interpreted to be the result of the oblique collision of these two Archaean cratons in the early Proterozoic. The Marymia Greenstone Belt comprises two corridors of northeast–southwest trending mafic/ultramafic and sedimentary sequences separated by a conglomerate-dominated sedimentary sequence. Three major structural events are interpreted to have shaped the belt, including D1 low-angle thrusting and isoclinal folding that has emplaced mafic and ultramafic units structurally above the sedimentary units
ASX:CYL
11
in the northwest side of the belt (the overthrust terrane), followed by southeast directed upright D2 folding and faulting, granite/porphyry sheet intrusion then D3 high-angle thrusting, open folding of earlier structures plus reactivation of the D1 and D2 thrusts. The Keillor gold deposit is structurally controlled, orogenic, mesothermal (amphibolite metamorphic facies) in style, associated with the late tectonic D3 high-angle thrusting event and open folding/flexing and dilation of earlier - including D1/D2 thrusts. Gold mineralisation at Keillor is associated with en-echelon vein arrays with are hosted in, and variably deformed by, D2 structures, including earlier northeast trending, shallowly plunging folds and later north trending shear bands. Gold bearing veins are subparallel to the penetrative, lay-parallel foliation, which is interpreted to be the result of deformation during both D1 and, more importantly, D2. Auriferous veins are also hosted within late-D2 shear bands which implies that vein development was continuous throughout the D2 event. Zones of high gold grade located along contacts between mafic and ultramafic units, preferentially within the antiformal hinge zone of a northerly plunging, asymmetric D2 fold parasitic to and located on the western limb of a regional synclinorium Although these lodes were considered relatively continuous both along strike and down dip, higher gold grades and zones of mineralisation are observed where local cross-faults have enhanced fluid flow, and around redox zones associated with the “Base of Complete Oxidation” (BOCO) and “Top of Fresh Rock” (TOFR). The lodes are dominantly quartz vein hosted, with gold existing as free particles within quartz gangue or associated with a sulphide (pyrrhotite-pyrite-chalcopyrite +/- galena) or telluride assemblage. Geological Interpretation A total of 52,790 m of surface drilling from 68 diamond only/ diamond tails and 119 RC only holes form the basis of this Mineral Resource update. Additional underground data comprised 280 DD holes (30,181 m), 65 sludge holes (578 m), and 1,786 m of face samples (Figure 2). Comprehensive RC/DD infill drilling has been completed at a nominal 30m x 30m drill intercept spacing was considered adequate to establish both geological and grade continuity and allow conversion of a large part of the Inferred MRE to the Indicated category. Underground grade control DD spacing typically required for stope definition was at a nominal spacing of 7.5m by 7.5m. Mineralisation domains have been interpreted primarily using geological logging and the location downhole of geological contacts, based on lithology, grade distribution, major faults and geometry. Weathering surfaces have been created by interpreting the existing logging for oxidation state and have been extended laterally beyond the limits of the Mineral Resource block model. Interpretations of mineralisation continuity have been generated in Seequent Leapfrog Geo™ using all available drillholes. Intercepts correlating to gold mineralisation and underpinned by strike continuity have been independently identified and manually selected within Leapfrog prior to creation of implicit volume models. A nominal cut-off grade of 0.2 g/t Au and a minimum downhole length of 2m was used to guide the geological continuity of the interpreted mineralisation. Selection of the cut-off grade was based on statistical and spatial analysis of composite data indicating a natural mineralisation population exists above 0.2 g/t Au. Within the mineralised wireframe, if an intercept fell below the nominal cut-off but continuity was supported by host lithologies and mineralisation style, the intercept was retained for continuity purposes due to the commodity and the style of deposit.
ASX:CYL
12
CYL considers confidence in mineralisation continuity and distribution, as implied within the Mineral Resource estimate classification of Indicated and Inferred, as moderate to high. The regularised drill pattern, drill centre spacing (varying from 7.5m to 100m) has allowed confident interpretation of the geometry and continuity of the higher-grade mineralised zones informing these Mineral Resources (Figure 3 and Figure 4). The mineralised corridor is approximately 1,700 m long along strike, 450 m wide, and extends up to 450m down dip to 200 mRL. The geological model is comprised of a total of 20 estimation domains grouped into the four main areas of West, Central Main and East Lodes. These lodes are controlled by subvertical structures and contacts between geological units which generally dip steeply westward and are relatively continuous both along strike and down dip. The higher-grade zones are focussed where local cross-faults have enhanced fluid flow. Moderate north and south plunging high-grade shoots are evident within the main vertical lodes at Keillor and are related to plunging fold closures. Mineralised zones can vary in thicknesses ranges from approximately 0.6 m to 20 m, with an average thickness of 2m to 4 m.
Figure 2 : Keillor Plan View – Drilling Type and Mineralisation Domains
ASX:CYL
13
Figure 3 : Keillor Cross Section A-B
Figure 4 : Keillor Long Section C-D
ASX:CYL
14
Estimation Methodology All geological domains used in the Keillor MRE have been constructed in Leapfrog software. Block modelling and grade interpolation have been carried out using Surpac software. Statistical analysis has been completed using Supervisor software. Block model constraints have been created by applying the interpreted mineralised domain wireframes. Sub-celling in all domains has been set at 1.25m x 1.25m x 1.25m to accurately reflect the volumes of the interpreted wireframes. All drillhole assay samples have been uniquely flagged according to the mineralisation domains. All drillholes are composited to 1m downhole using a best-fit methodology and 0.5m minimum threshold on inclusions. A small number of residual composites have been retained for use in the estimation. The geological model is comprised of a total of 20 estimation domains grouped into the four main areas of West, Central Main and East Lodes as outlined below in Table 3, and shown in Figure 2 and Figure 5.
Domain Type West Lodes
Central Lode Main Lodes
East Lodes
Domain Code 5100 5150 5200 5300 5310 5350 5400 5500 5600 5700 5800 6040 6050 6100 6150 6200 6300 6400 6500 6600
Description Hanging Wall Zone 1 Hanging Wall Zone 2 Hanging Wall Zone 3 West Lode Breccia Fault Splay Central Lode Main Lode Main Lode Splay Main Lode Splay Main Lode Splay Hanging Wall Northern Zone
East Lode NE trending Splay
Table 3 – Keillor Estimation Domains
ASX:CYL
15
Figure 5 : Keillor Main Estimation Domains – Isometric view looking east The distribution of gold grades within the mineralised lenses is highly variable and is characterised by distinct cohesive regions of higher tenor gold grades. Whilst these higher-grade zones appear reasonably cohesive, they are manifested by a high-degree of short-scale variability, making it difficult to manually interpret constraining domains. These internal high-grade regions are often surrounded by peripheral regions of lower grade mineralisation that are also highly variable. Raw Coefficients of Variation (CoV) vary from 1.2 to 14.7, indicating moderate to high grade variability. A traditional approach of physical domaining, assay cutting, and linear estimation (IDW or OK) is considered inadequate in dealing with this complexity. The estimation method implemented combines Categorical Indicator Kriging (CIK) to define broad estimation domains, together with applying distance limiting at chosen grade thresholds to restrict the influence of the high-grade values during grade interpolation. The CIK methodology has been utilised for the estimation of all 20 domains. Prior to estimation, a reference surface for each estimation domain was exported from Leapfrog. This is calculated as the best fit surface using the hanging wall and footwall surfaces. The reference surface was imported into Surpac and a dip and dip-direction value of each triangle facet was calculated. These orientations are then imported into the Surpac block model to provide information for dynamic search and variogram model orientation during interpolation. Dynamic estimation has been applied for estimating the CIK indicators and gold grades.
ASX:CYL
16
Categorical Indicator Kriging Workflow The estimation method applied to the CIK domains utilises a probabilistic method to define internal estimation sub-domains, together with applying distance limiting at chosen grade thresholds, to restrict the influence of the high grade and extreme grade values during the grade estimation. Two Categorical Indicator values are determined for the CIK domains: • •
A low-grade (LG) indicator assigned to differentiate between background ‘waste’ and low-tenor mineralisation. A high-grade (HG) indicator assigned to define broad areas of consistent higher-tenor mineralisation.
The indicators applied for each domain are summarised below: Area Group
Domain Code
West Lodes
5100, 5150
Domain Parameters Applied 5200
5200
5200
5300, 5310, 5350
5300
Central Lode
5400
5400
Main Lodes
5500
5500
5600, 5700, 5800
5600
6040, 6050, 6100 6150, 6200, 6300 6400, 6500, 6600
5200
East Lodes
Indicator (Au g/t)
Description
0.2 1.4 0.18 0.7 0.15 1.0 0.15 1.2 0.2 1.2 0.18 0.9
Low grade High grade Low grade High grade Low grade High grade Low grade High grade Low grade High grade Low grade High grade
0.2
Low grade
1.4
High grade
Table 4 - Keillor Estimation Indicators
Variograms were generated for the LG and HG indicators for Domain 5200, 5300, 5400 and 5600 and then applied to the other similar domains in the respective area group. The CIK indicators have been estimated using OK into a finely gridded block model with block dimensions of 1.25m x 1.25m x 1.25m. The small block size for the indicator process is beneficial for creating categorical sub-domains at a resolution which can be used to accurately back-flag composite data. Three categorical sub-domains have been generated: low-grade (LG), medium-grade (MG) and high-grade (HG) areas. The HG sub-domain has been based on an indicator probability threshold of 0.35 and the LG sub-domain has been based on an indicator probability threshold of 0.65. The MG sub-domain is assigned to blocks that do not satisfy either the HG or LG sub-domain criteria. The three categorical block model sub-domains (HG, MG and LG) have been used to ‘back-flag’ the 1m composites, creating a separate composite file for each sub-domain.
ASX:CYL
17
Assay top-cuts have been applied to the sub-domain composite files with the following values: Area Group West Lodes
Central Lode Main Lodes East Lodes
Domain Code 5100, 5150 5200 5300 5310 5350 5400 5500 5600, 5600, 5800 6040, 6050, 6100, 6150, 6200 6300 6400 6500 6600
LG cut (Au g/t) 1.5 2 0.7 0.2 0.15 2 4 2 1.5 1 2 3 1
MG cut (Au g/t) 5 5 8 2.5 1.5 8 15 8 5 7.5 7.5 10 2
HG cut (Au g/t) 15 18 30 12 35 35 80 35 15 30 30 75 7.5
Table 5 - Keillor Assay Top Cuts The assay top-cuts are generally above the 99th percentile of the distribution and have been aimed at globally limiting extreme values only. Top-cuts are not used as the primary tool to control metal risk. The use of grade thresholds and distance limiting is considered a more objective and influential method in controlling metal risk, while better reflecting the actual localised occurrence of discontinuous high-grade gold mineralisation. Grade thresholds for distance limiting have been determined for each domain using log-probability plots and visual inspection. The final applied grade distance limits applied are: Area Group
Domain Code
West Lodes
5100, 5150, 5200, 5300 5310 5350
Central Lode
5400
Main Lodes
5500 5600, 5700, 5800
East Lodes
6040, 6050, 6100, 6150, 6200, 6300, 6400, 6500, 6600
Indicator LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG LG MG HG
Grade 1 From (Au g/t) 0.15 1 12 0.1 1 4.5 0.12 1 12 0.15 1.5 5 0.2 1.5 15 0.15 1.5 12 0.2 1.5 15
Grade 1 To (Au g/t) 0.6 4 25 0.6 4 25 0.6 4 25 0.6 5 30 1.8 5 30 0.6 5 30 1.8 5 30
Distance 1 (metres) 40 20 20 40 20 20 40 20 20 40 20 20 40 20 20 40 20 20 40 20 20
Grade 2 From (Au g/t) 0.6 4 25 0.6 4 25 0.6 4 25 0.6 5 30 1.8 5 30 0.6 5 30 1.8 5 30
Grade 2 To (Au g/t) 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999
Distance 2 (metres) 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5
Table 6 - Keillor Distance limiting Thresholds
ASX:CYL
18
Prior to grade estimation, sub-domain codes from the 1.25m resolution block model have been imported into a 2.5m x 2.5m x 2.5m resolution block model and the proportion of LG, MG and HG is calculated for each 2.5m block. Grade estimation for the LG, MG and HG domains has been undertaken in Surpac software using OK with grade threshold distance limiting applied by domain. Search ellipse orientation and variogram orientations are drawn from the pre-populated dynamic anisotropy information recorded in each block. Final block grades at a 2.5m x 2.5m x 2.5m block resolution have been calculated by weighting the estimated grades for each sub-domain by the relevant domain proportion. The parent estimation block size is 2.5m x 2.5m x 2.5m. A minimum of 2 and maximum of 12 composites have been used for each sub-domain estimate per block. It is possible that up to 36 composites can be used to estimate a parent block where there is a proportion of all three sub-domains present. A single-pass estimation strategy has been used across all domains, whereby a search range of 100m by 100m by 40m and minimum 2 to maximum 12 composites has been utilised to estimate a grade. Octant restrictions have not been used. Block model validation was completed to check that the grade estimates within the block model are an appropriate reflection of the underlying composite sample data, and to confirm that the interpolation parameters have been applied as intended. Checks of the estimated block grade with the corresponding composite dataset have been completed using several approaches involving both numerical and spatial aspects as follows: • •
Semi-Local: Using swath plots in X, Y and Z directions comparing the estimates to the sample data. Local: Visual inspection of the estimated block grades viewed in conjunction with the sample data.
ASX:CYL
19
The final grade model for Main Domain 5500 in relation to the informing drill pierce points are shown in plan view in Figure 6.
Figure 6 : Main Domain 5500 – Keillor Grade Model (Au g/t) with Informing Composited Drill Intercepts
Bulk Density Density has been assigned to the resource using interpreted weathering surfaces determined from drillhole logging using water immersion density measurements from the diamond drill core. The following densities were coded into the Surpac model using the weathering domains generated in Leapfrog software: • • •
Oxide =1.8 Transitional=2.2 Fresh=2.9
ASX:CYL
20
Classification Criteria Mineral Resources were classified as Indicated and Inferred to appropriately represent confidence and risk with respect to data quality, drillhole spacing, geological and grade continuity and mineralisation volumes. Additional considerations were the stage of project assessment, amount of DD and RC drilling undertaken, underground sampling coverage, current understanding of mineralisation controls and mining selectivity within the mining environment. The drilling, surveying and sampling undertaken, and analytical methods and quality controls used, are appropriate for the style of deposit under consideration. Indicated Mineral Resources were defined where a moderate level of geological confidence in geometry, continuity and grade was demonstrated, and were identified as areas where: •
The portions of the Keillor MRE classified as Indicated have been flagged in areas of the block model where the average distance to the nearest informing composited drill intercept was nominally 30m or closer.
•
Blocks were interpolated with a neighbourhood largely informed by the maximum number of samples.
Inferred Mineral Resources were defined where a low to moderate level of geological confidence in geometry, continuity and grade was demonstrated, and were identified as areas where: •
The portions of the MRE classified as Inferred typically represent minor lodes or lower grade portions of the larger domains where geological continuity is present but not consistently confirmed by 30m spaced composited drill data.
•
The Inferred Resources were interpolated where the average distance to the nearest composited drill intercept was nominally 80m or closer. The extrapolation of the resource was limited to a maximum of 80m past the last sample point.
Further considerations of resource classification include; •
data type and quality
•
drilling type
•
drilling orientations
•
down hole surveys
•
sampling, and
•
assaying methods, and
•
geological confidence and geostatistical considerations.
Mineralisation within the block model which did not satisfy the criteria for classification as Mineral Resources remained unclassified. The delineation of Indicated and Inferred Mineral Resources appropriately reflects the Competent Person’s view on continuity and risk at the deposit and is shown in Figure 7.
ASX:CYL
21
Figure 7 : Main Domain 5500 – Keillor MRE classification with Informing Composited Drill Intercepts
Cut-off Grade The underground component of the MRE has been reported at a 1.5 g/t Au cut-off within transitional and fresh rock to a maximum vertical depth of 380m below the topographic surface. The open pit portion has been reported at a 0.5 g/t Au within an optimised pit shell based on oxide material only using a gold price of AUD$6,000. The Underground Mineral Resources cut-off grade has been derived from current mining and processing costs and metallurgical parameters used for the operating Keillor Underground mine and at the nearby Plutonic Underground Mine. Open Pit Mineral Resources are reported at cut-off grades derived from recent mining and processing costs and metallurgical parameters used at the recently completed Trident West Open Pit. The grade-tonnage curve for the Keillor classified resource for all domains is shown in Figure 8.
ASX:CYL
22
Figure 8 : Keillor MRE August 2026 vs MRE July 2024 Grade and Tonnage Curve Indicated and inferred only
Assessment of Reasonable Prospects for Eventual Economic Extraction The Keillor Mineral Resource has been undertaken with a focus on delineating areas of the MRE with Reasonable Prospects for Eventual Economic Extraction (RPEEE) by open pit and underground mining methods. The following criteria were considered in determining the RPEEE: • • • • • •
Deposit scale Geometry, in particular mineralisation true width and minimum mining width Proximity to ground surface Established ORE/existing mine plan for material above the Underground Resource Access to existing critical infrastructure Current gold price
Mining selectivity is assumed to include a minimum mining width of 1.5m, minimum stope length of 5m, and a minimum stope height of 5m. The Open Pit MRE has been reported at a 0.5 g/t Au and constrained within an optimised pit shell based on oxide material only using a gold price of AUD$6,000. The Underground MRE has been reported at a 1.5 g/t Au and constrained to only transitional and fresh material to a maximum vertical depth of 380m below the topographic surface.
ASX:CYL
23
The Mineral Resource is considered to have reasonable prospects for eventual economic extraction given the access to critical infrastructure, the volume and grade of mineralisation available for mining and the RPEEE criteria which have been applied prior to reporting the Mineral Resource. Mining and Depletion Historical mining has been undertaken at Keillor by Resolute Mining as part of their Marymia Project. Between 1992 and 1995 the Keillor open pit produced 963kt of ore grading 4g/t Au for approximately 124,600oz of contained gold. A 1997 cutback was abandoned in February 1997 after a major slip / wall failure Decline development commenced at Keillor Deeps in May 1997 from the base of the Keillor Open Pit. The decline produced a total of 3,700t of ore grading 1.9g/t Au for 226oz of contained gold when the operation was closed in January 1998. Catalyst commenced decline rehabilitation and Keillor open pit dewatering in May 2025, with first ore development in the 555mRL during December 2025. Maiden stoping commenced in March 2026 with second stoping horizon developed on 525 mRL from May 2026. The Keillor Underground Mine was declared in commercial production in April 2026. Ore is hauled 40 km to the Plutonic Process Plant at A$13.75 per ore tonne. No dilution or cost factors were applied to the estimate. Metallurgy Keillor underground ore metallurgical recovery is 92%. The 2026 Catalyst test-work, the 2005 Barrick testwork and seven years of processing at Marymia (1992–1998) all confirm 90–94% recovery for Keillor fresh material. Test-work demonstrates that the gravity recoverable gold of 26–31% before leaching together with appreciable coarse free gold. Final recovery is comparable with and without gravity. The nearby Plutonic and Plutonic East Underground gold mines are operating mines and there are no material metallurgical issues that are known to exist. No metallurgical recovery factors were applied to the Mineral Resources or resource tabulations.
This announcement has been approved for release by the Board of Directors of Catalyst Metals Limited.
Investors and Media: Craig Dingley Catalyst Metals T: +61 (8) 6324 0900 [email protected]
ASX:CYL
24
Competent person’s statement The information in this announcement which relates to the estimation and reporting of gold Mineral Resources at the Keillor deposit is based, and fairly represent, information and supporting documentation compiled by Mr Andrew Finch, BSc, a Competent Person who is a current Member of Australian Institute of Geoscientists (MAIG 3827). Mr Finch, Geology Manager, at Catalyst Metals Ltd has sufficient experience relevant to the style of mineralisation and deposit type under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Finch consents to the inclusion in the report of matters based on his information in the form and context in which it appears. JORC 2012 Mineral Resources, Ore Reserves The information in this announcement that relates to a Catalyst’s prior Exploration Results, production targets, estimates of Ore Reserves and Mineral Resources are extracted from ASX announcements referenced and available on the Company website www.catalystmetals.com.au and the ASX website (ASX code: CYL). Catalyst confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcement. Catalyst confirms that all material assumptions underpinning the production target, or the forecast financial information derived from a production target, in the initial announcement continue to apply and have not materially changed.
ASX:CYL
25
Section 1 Sampling Techniques and Data Keillor Deposit (Criteria in this section apply to all succeeding sections.) Criteria Sampling techniques
Drilling techniques
Drill sample recovery
Logging
ASX:CYL
Commentary • This release relates to the Mineral Resource Estimate (MRE) update for the Keillor Underground and Open Pit deposits. • All drilling data completed by Catalyst since the previous MRE (data cut-off date of 2 May 2024) to the current data cut-off date of 21 August 2026 has been incorporated. • A total of 52,790 m of surface drilling from 68 diamond only/ diamond tails and 119 RC only holes form the basis of this Mineral Resource update. Additional underground data comprised 280 DD holes (30,181 m), 65 sludge holes (578 m), and 1,786 m of face samples. o Diamond Drilling (DD) A significant portion of the data used in resource estimations has been gathered from diamond core. The majority of diamond core was NQ2, but multiple core sizes have been used historically. This core is geologically logged and subsequently halved for sampling. All samples honour geological boundaries (lithology, mineral assemblage, alteration etc) defined by logging. o Face Channel Sampling (FS) Each development face / round is chip sampled perpendicular to the mineralisation. The sampling intervals are domained by geological constraints (e.g. rock type, veining and alteration / sulphidation etc.). The majority of exposures within the orebody are sampled. o Sludge Drilling (SL) Sludge drilling is performed with an underground production drill rig. It is an open hole drilling method using water as the flushing medium, with a 45mm or 102mm hole diameter. Nominal sample lengths of 0.9m and 1m are used depending on whether a Jumbo or Longhole configuration is used. A 3-5kg sample is captured using the ‘sludge cone’ (aluminium cylindrical cone purchased from WESTERNEX). o RC Drilling (RC) RC samples were collected for each metre drilled and passed through a cyclone and cone splitter to produce a 2-7 kg assay into calico bags. Samples are generally dry. The residual material is retained on the ground near the hole. • The Keillor deposit has historically been sampled using numerous drilling and sampling techniques by both Catalyst Plutonic and previous operators. Drilling and sampling techniques by previous operators are assumed to have been to industry standards at that time. • RC drilling used a nominal 5.75-inch diameter face sampling bit. • DD was undertaken from surface or as DD NQ2 tails from RC pre-collars. • Underground DD is exclusively NQ2 core. with a diameter of 47.6 mm. • Sludge drilling is an open hole drilling method using water as the flushing medium, with a 45mm or 102mm hole diameter. Probe hole lengths range from 3m to 25m depending on whether a Jumbo or Longhole configuration is used. • Selected DD holes were drilled using HQ and PQ usually for geotechnical assessment or metallurgical testwork. • All competent DD core is orientated using a Reflex ACT device and detailed structural measurements and logging is carried out. • All holes have been logged on site by an experienced geologist. • The core is jig-sawed back together and metre marked carefully. Discrepancies to core blocks are resolved with the drill contractor. Core loss blocks are inserted as required. • Core recovery for the diamond drilling is based on the measured core returned for each 3m run. • Overall drill core recovery is very good, with an average recovery of 98% through the mineralised zones. • RC drilling has been bagged on 1m intervals and an estimate of sample recovery made on the size of each sample. • Sludge holes are drilled at a sufficient angle (>25 deg) to ensure adequate hole flushing and chip drainage to minimise effects of sample smearing between metre intervals. • There is no known relationship between sample recovery and grade at Keillor. • All RC pre-collars have been logged on 1m intervals. • DD samples have been logged by qualified geologists to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. • Logging is both qualitative and quantitative. 100% of drill core is logged. • Logging records include: depth from, depth to, lithology, texture, colour, alteration style, alteration
26
Criteria
Sub-sampling techniques and sample preparation
Commentary intensity, alteration mineralogy, sulphide (percentage and type), quartz (percentage), veining, and general comments. • Orientated core structural measurements have been taken at relevant structures and where the foliation is relatively consistent. • All drill core is photographed both wet and dry. All photos are stored on the Company’s servers, with the photographs from each hole contained within separate folders. • Development faces are mapped geologically. • All RC composited samples were dispatched to the ALS and BV laboratories in Perth for gold fire assay analysis. • Surface DD core was half-cut and sampled on 1m intervals or to geological contacts, with sample lengths varying between 0.2m to 1.6m. Whole core sampling was instigated for broken/sheared zones which could not be cut. This resolved any possible biasing issues with 1/2 core grab samples within incompetent fractured and sheared zones. • Surface DD core samples were sent to several labs: the majority to ALS (Au-AA26), and the remainder to BV (Au-FA450) and the Plutonic onsite lab (PAL_DIBK). • All underground NQ grade control holes (47.6mm diameter) were whole-cored sampled to streamline the core handling process. Sample lengths ranged from 0.1m to 2m. • Sludge drilling used nominal sample lengths of 0.9m and 1m depending on whether a Jumbo or Longhole configuration is used. A 3-5kg sample is captured using the ‘sludge cone’ (aluminium cylindrical cone purchased from WESTERNEX). • Face channel samples were nominally chipped across the face from left to right, sub-set via geological features as appropriate. Sample lengths ranged from 0.2m to 1.5m • All underground grade control samples were dispatched to the Plutonic site laboratory for analysis using PAL method (PAL_DIBK) •
•
•
•
•
ASX:CYL
Sample preparation procedures for the Plutonic onsite lab by PAL method (PAL_DIBK) includes: o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o A nominal 500g riffle split sample is used for PAL assaying for 1 hour leach cycle o PAL 1000 Grind Check: A minimum of 95% passing 75 μm sieve size. o Sample re-assay or duplicate samples are taken from the retained original crushed sample Sample preparation procedures for Plutonic onsite lab by Fire Assay method (FA40) includes: o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 75% passing 3.2mm. o 1-1.5kg riffle split for pulverisation o Pulverise to 85% passing 75μm o Scoop 250-300g aliquot for lead collection Fire Assay 40g charge with AAS finish Sample preparation procedures at ALS laboratory includes: o Sample sorting and drying (DRY-21). o Core sample is coarse crushed (CRU-21), RC samples not crushed. o Pulverise entire sample to a particle size of 85% passing 75µm (PUL-24). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (Au-AA26). Sample preparation procedures at BV laboratory includes: o Sample sorting and drying (PR001). o Entire core sample is crushed to 10mm (PR102), RC samples not crushed. o Riffle splitting to obtain between 1.2 to 3kg. o Pulverising to a particle size of 90% passing 75µm (PR303). o 200g sample aliquot for lead collection Fire Assay 50g charge with AAS finish (FA450). Sample preparation protocols and sample sizes are considered appropriate for the style of mineralisation encountered and should provide representative results. ALS BV Plutonic Grand Sample Type Total FA50 FA50 FA40 PAL DD 163 531 399 14,392 15,485 RC 570 19,969 3,517 306 24,362 UGDD 29,465 29,465 SL 530 530 FS 1,832 1,832 Grand Total 733 20,500 3,916 46,525 71,674
27
Criteria Quality of assay data and laboratory tests
Verification of sampling and assaying
Location of data points
Data spacing and distribution
Orientation of data in relation to geological structure
Sample security
ASX:CYL
Commentary • Fire assay gold analysis is considered to be total gold analysis. • Samples analysed at Plutonic onsite lab used the PAL method (PAL_DIBK). The Pulverising and Leach (PAL) method is not considered to be a total gold analysis, however the larger sample size still produces a representative result. • Samples were dried, crushed and pulverised prior to analysis. • Certified Reference Material (CRM) were submitted at an average rate of 4% of the total primary samples. CRMs are of similar grade tenor to those expected grades in the sampling and were selected based on their grade range and mineralogical properties with an emphasis on sulphide ores. • Coarse 40mm blanks were inserted at an average rate of 4% of the total primary samples. • RC field duplicates were inserted at an average rate of 5% of the total primary samples. • A mix of field duplicates (1/4 core) and coarse crush duplicates were inserted in the DD drilling, at an average rate of 3% of the total primary samples. • Crush sizing analysis is conducted randomly by the commercial laboratories as part of their QC process. Pulp residues are expected to have 90% passing ≤75μm. This data is monitored by the Laboratory Supervisor. Grind times can be lengthened accordingly. • Current procedures dictate a process of validation and checking of laboratory results when data is returned by the laboratory as it is loaded into the independently managed Quest database. A standard set of plots and checks are undertaken, and if results fall outside of the expected limits, then re-assaying is requested. QAQC reports are generated by the Project Geologist and documented from automated routines out of the database • RC and diamond drilling data has been verified by the geologist first and then the Database Administrator before importing into the main Quest database (proprietary database system). • RC and DD logging is completed electronically on laptops. Database protocols and rules are applied upon data entry. • All drill data within site databases are regularly validated using both internal database systems and external validation tools. • All surface drill collars have been accurately located using DGPS. Downhole survey data was collected using an Axis Mining Technology Champ North Seeking Gyro tool. Surveys are undertaken on 10m intervals as the tool is removed from the drillholes once the drillhole is completed. • UG hole collar locations are picked up regularly by site surveyors. Downhole surveys are completed using a DeviGyro survey instrument every 3 metres. • Downhole surveys are visually inspected for anomalous changes in drill trace, (i.e does the drillhole apparently bend inordinately). • The drill spacing for the broader drilling outside of the current MRE is wide, ranging from 100m to 500m and should be considered exploratory in nature. • Wide-spaced drilling up to 100 x 100 m has also been modelled but with lower confidence defining the Inferred resource category. Some sections have closer spacing in high grade zones confirming the continuity and structural understanding. • Comprehensive RC/DD infill drilling has been completed at a nominal 30m x 30m drill intercept spacing was considered adequate to establish both geological and grade continuity and allow conversion of a large part of the Inferred MRE to the Indicated category. • Underground grade control DD spacing typically required for stope definition was at a nominal spacing of 7.5m by 7.5m. • Sample compositing has only been used in the RC pre-collars through the granite cover rocks. • The orientation of a majority of the drilling is approximately perpendicular to the strike and dip of the mineralisation and is unlikely to have introduced any sampling bias. • Certain drillholes may have been drilled parallel to key structures, but the density of drilling and drilling on other orientations has allowed detailed geological modelling of these structures and hence any sampling bias in a single drillhole has been removed. • Underground DD and sludge holes were drilled as ‘fans’ from suitable drill platforms and intersect the lodes at variable orientations. • The variable drill orientation relative to mineralisation, particularly within the mine development footprint is not considered to materially affect the resource estimate. • The chain of custody is managed by Catalyst employees and contractors. • Any unsampled drill core is kept in an unfenced core farm adjacent to the core cutting and processing shed. This is not regarded as a security risk due to the remote location of the mine with no community development near the mine. All core is photographed and records kept
28
Criteria
Audits or reviews
Commentary electronically. • Geologists are responsible for marking the sample intervals and placement of Blanks and CRM’s within the sample lot. The Project Geologist and Senior Geologist complete quality control checks on both the Surface and Underground GC drilling data daily. • Field Staff are primarily responsible for sampling of core, generating the sample numbers for core submission, creating a sample submission sheet, selecting and recording the CRMs to be sent to the laboratory and the transportation of the samples to the laboratory. Samples are tracked during shipping. • Once a drillhole has been sampled, the sample intervals and checked geology documents are uploaded into the Quest database system managed by EarthSQL. • The independent Database Administrator (DBA) merges the validated drilling data with the certified laboratory assay files where validation routines for QAQC are completed before database exports and reports are issued. • Drill logs are kept in hard copy and electronically. • Catalyst samples have been stored on site and delivered to the ALS and BV assay laboratories in Perth by a Contracted Transport Company. Consignment notes have been used to track the samples. Operator sample security is assumed to be consistent and adequate. • No specific information has been obtained relating to historical sampling security. • CRMs, blanks and duplicates are reviewed continuously and indicate that sampling and analysis has been completed appropriately with no significant issues discovered. • No audit or reviews of sampling techniques have been undertaken however the data is managed by company geologist who has internal checks/protocols in place for all QA/QC. • Historical reviews of the database for the Keillor area have been examined previously and a proportion of drillholes compared to original data sources and found to be consistent wherever checked. • Historical reviews of standards, blanks and duplicates indicate sampling and analysis has been completed with no issues discovered.
Section 2 Reporting of Exploration Results Keillor Deposit (Criteria listed in the preceding section also apply to this section.) Criteria Commentary Mineral • Located in the Marymia - Plutonic Greenstone Belt ~218 km northeast of Meekatharra in the tenement and Midwest mining district in WA Land tenure • Keillor is located on the M52/183 granted tenement and is in good standing. status • The tenement predates Native title interests but is covered by the Gingirana Native Title claim. • The tenements are 100% owned by Catalyst Metals Ltd after being acquired from Vango Mining Limited and subsidiary Dampier (Plutonic) Pty Ltd in March 2023. • Gold production will be subject to a 2.5% government royalty. Exploration done • Extensive previous work was completed by Vango Mining, Resolute Mining, Homestake Gold, Battle by other parties Mountain Australia, Barrick Mining and Dampier Gold. • Previous metallurgical and resource work has been completed by Resolute Mining, Barrick Mining and Dampier Gold. Catalyst consolidated the belt in 2023 following the successful acquisition of Vango Mining and the merger with Superior Gold Inc. Geology • The Plutonic Well Greenstone Belt is a north-easterly trending belt approximately 50km long and 10km wide. It consists of predominantly mid to upper greenschist facies metamorphosed ultramafic volcanics, tholeiitic basalts, minor felsic volcanics and sediments. • The Keillor deposit is located at the north-eastern end of the Plutonic Well Greenstone Belt, which forms part of the Marymia Inlier. The Marymia Inlier is a granite-greenstone terrane situated between the Yilgarn and Pilbara Cratons in Western Australia. • The local geology of Keillor is composed of a series of north-east, south-west trending mafics, ultramafic and metasedimentary lithologies metamorphosed to lower amphibolite facies. • The Keillor gold deposit is structurally controlled, orogenic, mesothermal (amphibolite metamorphic facies) in style, associated with the late tectonic D3 high-angle thrusting event and open folding/flexing and dilation of earlier - including D1/D2 thrusts. • Gold mineralisation at Keillor is associated with en-echelon vein arrays with are hosted in, and
ASX:CYL
29
Criteria
• •
• Drill hole Information Data aggregation methods Relationship between mineralisation widths and intercept lengths Diagrams
•
Balanced reporting Other substantive exploration data Further work
•
• • • •
• •
Commentary variably deformed by, D2 structures, including earlier northeast trending, shallowly plunging folds and later north trending shear bands. Gold bearing veins are subparallel to the penetrative, layparallel foliation, which is interpreted to be the result of deformation during both D1 and, more importantly, D2. Auriferous veins are also hosted within late-D2 shear bands which implies that vein development was continuous throughout the D2 event. Zones of high gold grade located along contacts between mafic and ultramafic units, preferentially within the antiformal hinge zone of a northerly plunging, asymmetric D2 fold parasitic to and located on the western limb of a regional synclinorium Although these lodes were considered relatively continuous both along strike and down dip, higher gold grades and zones of mineralisation are observed where local cross-faults have enhanced fluid flow, and around redox zones associated with the “Base of Complete Oxidation” (BOCO) and “Top of Fresh Rock” (TOFR). The lodes are dominantly quartz vein hosted, with gold existing as free particles within quartz gangue or associated with a sulphide (pyrrhotite-pyrite-chalcopyrite +/- galena) or telluride assemblage. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. Drilling is orientated as close to perpendicular to mineralisation where possible. However, orientation to the lodes may be compromised by access to suitable drill platforms. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. As all available drill hole information has been incorporated into the Mineral Resource, the drill intercepts have not been reported separately. No additional exploration data is included in this release. Grade Control, Resource definition, infill and extensional drilling programs are ongoing, and will continue in line with mine development requirements.
Section 3 Estimation and Reporting of Mineral Resources Keillor Deposit (Criteria listed in section 1, and where relevant in section 2, also apply to this section.) Criteria Criteria
Commentary Commentary
Database integrity
• • •
• •
•
ASX:CYL
The Catalyst drillhole database is managed by a third-party consultant EarthSQL in Quest Database system (a proprietary SQL server hosted database). Keillor drilling data has been exported to MS Access and audited before estimation. Various validation checks in GEOVIA Surpac™ and Seequent Leapfrog Geo™ 3D software and data queries in MS Access were undertaken such as overlapping samples, duplicate entries, missing data, sample length exceeding hole length, unusual assay values and a review of below detection limit samples. A visual examination of the data was also completed to check for erroneous downhole surveys. The data validation process identified no major drill hole data issues that would materially affect the MRE outcomes. Database checks included the following: o Checking for duplicate drillhole names and duplicate coordinates in the collar table. o Checking for missing drillholes in the collar, survey, assay and geology tables based on drillhole names. o Checking for survey inconsistencies including dips and azimuths <0˚, dips >90˚, azimuths >360˚ and negative depth values. The drillhole database used for resource estimation, dated 21 August 2026, was comprised of the following main table records: o Collar - 5,940 o Survey - 35,591
30
Criteria
Site visits Geological interpretation
Dimensions
Estimation and modelling techniques
Commentary o Lithology - 82,398 • Assay - 308,307 • The Competent Person undertakes frequent site visits to the Plutonic Gold Operation and associated Marymia tenements. • The geology of the Keillor area is dominated by northeast- southwest trending mafic-ultramafic and sedimentary package which has been metamorphosed to lower amphibolite facies and intensely deformed. Foliation and bedding are generally steeply dipping. • Mineralised zones dip between steep to low angles to both the east and west, depending on the lithological/structural control and location in fold hinges or on fold limbs. Previous interpretations have modelled these lodes as relatively continuous for several hundred metres along strike, although offsets occur on cross faults. Moderate north and south plunging high-grade shoots are evident within the main vertical lodes at Keillor. • The west, central, main and east lodes are controlled by subvertical structures and contacts between geological units which generally dip steeply westward. • Although these lodes were considered relatively continuous both along strike and down dip, higher gold grades and zones of mineralisation are observed where local cross-faults have enhanced fluid flow. • Mineralisation is associated with zones of intense silicification and millimetre to centimetre thick quartz
- carbonate veins, which are parallel to the D2 foliation and shear bands. Gold exists as free particles within quartz gangue or associated with a sulphide (pyrrhotite-pyrite-chalcopyrite +/- galena) or telluride assemblage. • Mineralisation domains have been interpreted primarily using geological logging and downhole geological contacts, based on lithology, gold grade distribution, major fault location and geometry. • A nominal cut-off grade of 0.2g/t Au, and a minimum downhole length of 2m was used to guide the geological continuity of the interpreted mineralisation lodes. • Interpretation of the mineralisation has been undertaken in Seequent Leapfrog Geo™ software using all available drillholes. Intercepts correlating to gold mineralisation and underpinned by strike continuity have been independently identified and manually selected within Seequent Leapfrog Geo ™ prior to creation of implicit volume models. • The geological model is comprised of a total of 20 estimation domains grouped into the four main areas of West, Central Main and East Lodes. • Catalyst considers confidence is moderate to high in the geological interpretation and continuity of the mineralisation domains. Underground development mapping and sampling has confirmed the local structural controls and lode orientations. • The mineralised corridor is approximately 1,700 m long along strike, 450 m wide, and extends up to 450 m down dip to 200 mRL. • The mineralised domains strike northeast–southwest and are dominantly sub-vertical. • Estimation domain thicknesses ranges from approximately 0.6 m to 20 m, with an average thickness of 2m to 4 m. • • The MRE interpretation and estimation used 52,790 m of surface drilling from 68 diamond only/ diamond tails and 119 RC only holes. Additional data comprised 280 underground DD holes (30,181 m), 65 sludge holes (578 m), and 1,786 m of face samples. • Interpretations used all available drillhole data, including underground face samples and sludge holes. All RAB drilling data was excluded from the resource estimation. • The domain intercepts have been imported into the MS Access database and prepared for compositing in Surpac. • No deleterious elements have been estimated or assumed. • Only gold grade has been estimated. • The model has been validated by comparing statistics of the estimated blocks against the composited sample data, and visual examination of the of the block grades versus the assay data in section and swath plots. CIK Methodology • All drillhole assay data has been composited to 1m downhole using the best fit algorithm in Surpac. • The moderate to high grade variability and lack of spatial continuity of high grades requires a non-linear approach to deal with the high grades during estimation. A traditional approach of physical domaining, assay cutting, and linear estimation (IDW or OK) is considered inadequate in dealing with this complexity.
ASX:CYL
31
Criteria
Commentary • The estimation method combines Categorical Indicator Kriging (CIK) to define broad estimation domains, together with applying distance limiting at chosen grade thresholds to restrict the influence of the high-grade values during grade interpolation. • Prior to estimation, a reference surface for each estimation domain was exported from Leapfrog. This is calculated as the best fit surface using the hanging wall and footwall surfaces. • The reference surface was imported into Surpac and a dip and dip-direction value of each triangle facet is imported into the Surpac block model to provide information for dynamic search and variogram model orientation during interpolation. Dynamic estimation has been applied for estimating the CIK indicators and gold grades. • Two Categorical Indicator values have been determined: o A low-grade (LG) indicator was assigned to differentiate between background ‘waste’ and lowtenor mineralisation. o A high-grade (HG) indicator was assigned to define broad areas of consistent higher-tenor mineralisation. • The indicators applied for each domain are summarised below:
• •
•
• •
ASX:CYL
Variograms were generated for the LG and HG indicators for Domain 5200, 5300, 5400 and 5600 and then applied to the other similar domains in the respective area group. The CIK indicators have been estimated using Ordinary Kriging into a finely gridded block model with block dimensions of 1.25m x 1.25m x 1.25m. The small block size for the indicator process is beneficial for creating categorical sub-domains at a resolution which can be used to accurately back-flag composite data. Three categorical sub-domains have been generated: low-grade (LG), medium-grade (MG) and highgrade (HG) areas. The HG sub-domain has been based on an indicator probability threshold of 0.35 and the LG sub-domain has been based on an indicator probability threshold of 0.65. The MG sub-domain is assigned to blocks that do not satisfy either the HG or LG sub-domain criteria. The three categorical block model sub-domains (HG, MG and LG) have been used to ‘back-flag’ the 1m composites, thus creating a separate composite file for each sub-domain. Assay top-cuts have been applied to the sub-domain composite files as follows:
32
Criteria
Commentary
•
•
• • •
•
•
ASX:CYL
The assay top-cuts are generally above the 99th percentile of the distribution and have been aimed at globally limiting extreme values only. In this estimation methodology, top-cuts are not used as the primary tool to control metal risk. The use of grade thresholds and distance limiting is considered a more objective and influential method in controlling metal risk, while better reflecting the actual localised occurrence of discontinuous high-grade gold mineralisation. Grade thresholds for distance limiting have been determined from log-probability plots and detailed review of the spatial locations of the gold grades. The final applied grade distance limits applied were:
Prior to grade estimation, sub-domain codes from the 1.25m resolution block model have been imported into a 2.5m x 2.5m x 2.5m resolution block model and the proportion of LG, MG and HG is calculated for each 2.5m block. The choice of a 2.5m x 2.5m x 2.5m block size reflects the likely mining selectivity achievable for an underground mining scenario. Grade estimation for the LG, MG and HG sub-domains has been undertaken in Surpac software using Ordinary Kriging (OK) with grade threshold distance limiting. Search routines and variogram orientations are drawn from the pre-populated dynamic search information recorded in each block (dynamic anisotropy). Final block grades at a 2.5m x 2.5m x 2.5m block resolution have been calculated by weighting the estimated grades for each sub-domain by the relevant domain proportion. The parent estimation block size is 2.5m x 2.5m x 2.5m. A minimum of 2 and maximum of 12 composites have been used for each sub-domain estimate per block. It is possible that up to 36 composites can be used to estimate a parent block where there is a proportion of all three sub-domains present. A single-pass estimation strategy has been used across all domains, whereby a search range of 100m by 100m by 40m and a minimum of 2 to a maximum of 12 composites has been utilised to estimate the
33
Criteria
Commentary grade. Octant restrictions have not been used.
Moisture Cut-off parameters
o • • •
Mining factors or assumptions
• • •
Metallurgical factors or assumptions Environmental factors or assumptions
• • • •
Bulk density
•
Classification
• •
• •
Audits or reviews
• • •
ASX:CYL
All estimations have been carried out on a ‘dry’ basis.
The Keillor Underground Mineral Resources is reported at a cut-off grade of 1.5 g/t Au. The cut-off grade has been derived from current mining and processing costs and metallurgical parameters used for the operating Keillor Underground mine and at the nearby Plutonic Underground Mine. Keillor Open Pit Mineral Resources are reported at cut-off grades derived from recent mining and processing costs and metallurgical parameters used at the recently completed Trident West Open Pit. The Keillor Underground Mineral Resources is reported to a maximum vertical depth of 380m below the topographic surface at a 1.5 g/t Au cut-off grade. Mining selectivity is assumed to include a minimum mining width of 1.5m, minimum stope length of 5m, and a minimum stope height of 5m. The Keillor Open Pit Mineral Resource is reported within an optimised pit shell evaluation (A$6,000) from the undiluted and depleted resource model. No additional mining modifying factors were applied. It is assumed the material will be trucked and processed at the Plutonic Gold Plant. Recovery factors are assigned based on lab test work and on mining factors derived from the current Keillor Underground mine and the nearby recently completed Trident West Open Pit. No metallurgical assumptions have been built or applied to the resource model. A conventional storage facility is used for the process plant tailings. The small amount of waste rock is stored in a traditional waste rock landform ‘waste dump’. Due to low sulphide content and the presence of carbonate alteration the potential for acid content is considered low. Density has been assigned to the resource models using interpreted weathering surfaces determined from drill hole logging. o Oxide =1.8 o Transitional=2.2 Fresh=2.9 Mineral Resources were classified as Indicated and Inferred to appropriately represent confidence and risk with respect to data quality, drillhole spacing, geological and grade continuity and mineralisation volumes. Additional considerations were the stage of project assessment, amount of DD and RC drilling undertaken, current understanding of mineralisation controls and mining selectivity within the mining environment. The drilling, surveying and sampling undertaken, and analytical methods and quality controls used, are appropriate for the style of deposit under consideration. Factors considered when classifying the model include: o The portions of the Keillor MRE classified as Indicated have been flagged in areas of the block model where the average distance to the nearest informing composited drill intercept was nominally 30m or closer. o The portions of the MRE classified as Inferred typically represent minor lodes or lower grade portions of the larger domains where geological continuity is present but not consistently confirmed by 30m spaced composited drill data. The extrapolation of the resource was limited to a maximum of 80m past the last sample point. o Further considerations of resource classification include; data type and quality (drilling type, drilling orientations, down hole surveys, sampling and assaying methods); geological mapping and understanding. The Mineral Resource estimate appropriately reflects the view of the Competent Person. The geological interpretation, estimation parameters and validation of the resource model was peer reviewed by Catalyst staff. No external reviews of the resource estimate had been carried out at the time of writing.
34
ASX Announcement 2 September 2026 Catalyst Metals’ flagship asset is the 40km long Plutonic Gold Belt in Western Australia. This belt currently produces ~100koz pa at an AISC of ±A$2,800/oz from three mines at Plutonic Main, Plutonic East and K2. Catalyst is currently bringing three new mines into production - Trident UG, Cinnamon & Old Highway. Each will be processed through the existing, underutilised and centrally located 2Mtpa CIL processing plant. Exploration is targeting down dip extensions of each of these deposits. With the development and exploration of these five deposits, Catalyst aims to increase Reserves and production from 1.5Moz to ±2Moz and ±100koz to ±200koz annually. In so doing, Catalyst is aiming for Plutonic to have a 10 year mine life - a unique and rare proposition for an underground Western Australian gold mine. Catalyst also controls a processing plant and +75km of strike length immediately north of the historic +22Moz Bendigo goldfield. Here, Catalyst has delineated a high-grade, greenfield resource at 26 g/t Au. Further discoveries along strike are expected. Capital Structure Shares o/s: 261m Options: 0.5m Rights: 12.2m Cash & Bullion: A$331m Debt: Nil Reserve and Resource1,2 MRE: 4.5Moz at 3.3g/t Au ORE: 1.5Moz at 2.6g/t Au Corporate Details ASX: CYL E:investors@catalystmetals. com.au W:catalystmetals.com.au
ASX:CYL
Successful infill drilling at Cinnamon confirms bulk scale mining with true width intercepts of 27m @ 20 g/t & 57m @ 6.9g/t Au Infill drilling program allows for updated Resource and Reserve • Cinnamon is an undeveloped gold deposit located 25km from Plutonic’s processing plant • It is to be the sixth ore source in Plutonic‘s growth plan to double annual gold production to ±200koz • After discovery of the high-grade shoot at Cinnamon in October 2025, Catalyst sought to infill drill it for the purposes of an updated Resource and Reserve. The results of this infill drilling program are below:
o o o o
27m at 20.5g/t Au 60m at 9.2g/t Au 57m at 6.9g/t Au 13m at 19.1g/t Au
o o o o
36m at 6.3 g/t Au 35m at 6.1g/t Au 19m at 5.7 g/t Au 8m at 13.1g/t Au
o o o o
30m at 3.3g/t Au 16m at 4.5g/t Au 16m at 4.1g/t Au 7m at 7.8g/t Au
• Previously released Cinnamon drilling results are shown overleaf • Drilling to date has confirmed consistent widths across the ore body. Importantly, assays demonstrate broad zones of continuous mineralisation and grade (refer inset at Figure 1) which will lead to lower risk, bulk scale underground mining • This high-grade Cinnamon shoot is hosted in one of several repeating, stacked conglomerate units. Part of this drill program sought to test for mineralisation in these parallel and deeper repeating conglomerate units • Encouragingly, results received in these target areas confirm mineralisation, including 8m at 4.7g/t Au, 8m @1.6g/t and 0.5m at 21g/t Au (see Figure 1) • This demonstrates the potential for repeat mineralised zones above and beneath the existing high-grade zone. Future drilling is planned to follow up on these results • Catalyst’s plan is to increase Plutonic’s gold production to ±200koz. The source of this production is to come from six mines, including Cinnamon. Multiple ore sources will allow stockpiles to be built ahead of the processing plant, creating greater flexibility, contingency and lowering operating risk of the long-term plan • In September 2025, Catalyst released general 10-year guidance. Since then, Catalyst has seen changes to permitting timelines, Reserves/Resources (Cinnamon being one such Resource), geological understanding, operational delays and processing capability • As a consequence, September 2025 should be seen as a general guide as to management’s long-term plans for Plutonic Belt’s production. Future guidance will update for these new changes being observed Catalyst Metals Limited (Catalyst or the Company) (ASX:CYL) is pleased to report further drill results at the Cinnamon deposit, located on the Plutonic Gold Belt. Drilling has targeted infill of the high-grade mineralised zone beneath the existing open pit Resource, and testing for repeat mineralised zones within conglomerate units at depth. Note 1: MRE includes Indicated Resources of 32.9Mt at 3.3g/t for 3.4Moz and Inferred Resources of 9Mt at 2.7g/t for 0.8Moz. ORE includes probable Reserves of 18.1Mt at 2.6g/t for 1.5Moz. Note 2: Refer to ASX announcement 14 October 2025 “Annual Report to shareholders.
Results confirm the continuity of the mineralised zone and, for the first time, confirm gold mineralisation within alternative conglomerate units at depth. Catalyst’s Managing Director & CEO, James Champion de Crespigny, commented: “With this discovery and delineation of Cinnamon, the Plutonic Belt’s future is secure. We now have multiple high-grade ore sources and the balance sheet to get us there. The path to 200koz is now just a matter of time. Drilling at Cinnamon has moved quickly. Within twelve months we expect to have moved from greenfields discovery to Reserve, with production following soon after. Our existing operations and infrastructure make this rapid speed possible. The attractiveness of the deposit is becoming clearer with rarely seen thick high grade mineralised intercepts amenable to bulk mining of large underground stope tonnes at attractive grades. The results we are most interested in going forward sit outside the known high-grade shoot. Replicating another high-grade shoot will be a material change to the business.” Drill Program Details In mid-2025, Catalyst commenced drilling at Cinnamon, targeting growth of the existing Cinnamon open pit Resource and testing previously underexplored areas. That drilling discovered a wide, high-grade mineralised zone immediately beneath the existing Cinnamon open pit, approximately 200m below surface. Drilling to date has delineated a 700m mineralised strike length. Results from these previous programs include1:
o o o o o o o o
38m at 10.5g/t Au 37m at 3.7g/t Au 33m at 7.4g/t Au 19m at 3.7g/t Au 31m at 7.7g/t Au 20m at 2.9g/t Au 15m at 4.0g/t Au 7m at 14.6g/t Au
o o o o o o o o
17m at 21.5g/t Au 19m at 2.4g/t Au 22m at 14.3g/t Au 17m at 3.0g/t Au 30m at 2.9g/t Au 11m at 4.4g/t Au 18m at 3.6g/t Au 12m at 2.8g/t Au
The current program has had two objectives.
o o o o o o o o
19m at 4.1g/t Au 9m at 2.5g/t Au 37m at 4.2g/t Au 13m at 6.1g/t Au 18m at 9.7g/t Au 19m at 4.1g/t Au 17m at 4.1g/t Au 17m at 2.6g/t Au
- Infill drilling - focussed primarily on the high-grade zone beneath the open pit. This drilling will support a maiden Resource and Reserve expected to be released in the coming weeks. Results confirm the continuity of the mineralisation across the shoot. Individual intercepts contain higher-grade zones, but grade and mineralisation are continuous along the intercept length rather than confined to isolated high-grade intervals.
- Limited testing of repeat conglomerate units - gold mineralisation at Cinnamon is hosted within conglomerates and generally associated with shear zones. Drilling has sought to test for mineralisation within known repeat conglomerate units. To date, four areas have returned interesting results and support the hypothesis of potential repeat mineralisation. Two of these sit above the existing high-grade zone and two below. Follow up drilling will be undertaken in the coming months to test these areas. Deeper drilling will also be undertaken to test additional conglomerate units at depth. 1 ASX announcement 13 May 2026 “Cinnamon strike length grows” and ASX Announcement 19 Jan 2026 ‘New high-grade zone discovered below
Cinnamon Resource’
2
ASX:CYL
Cinnamon Trend The Cinnamon trend is a +10km trend located 25km north-east of the underutilised Plutonic processing plant. Historical drilling along the trend is limited and has been focused on shallow drilling of only the Cinnamon and Cobalt deposits (Refer Figure 2). The limited drilling at Cinnamon, prior to Catalyst’s ownership, had delineated a Resource of 3.0Mt at 1.5 g/t for 145koz Au (including indicated of 2.1Mt at 1.7g/t Au for 113koz Au). Probable Ore Reserves were 1.4Mt at 1.5g/t for 65koz of gold2. Historic exploration and mining along the Plutonic Belt has focused almost entirely on the mine mafic host rock, home to the Plutonic Gold Mine and driver of all geological models to date. The Belt has, however, demonstrated gold mineralisation to be hosted in other rock types – Plutonic Main (Resource 2.2Moz at 3.5g/t 2; historic production of 7Moz) is hosted in the mafic, Trident (Resource 1.1Moz at 5.4g/t 3) is hosted in the ultramafic, and deposits on the Cinnamon trend are hosted in a sedimentary (conglomerate) sequence. This opens up alternative, new exploration horizons for Catalyst to target. More specifically, Cinnamon sits within a conglomerate host as part of a broader sedimentary sequence within the middle of the Plutonic Gold Belt. The Cinnamon mineralisation appears to be controlled by a dominant shear running ~10km northeast of the Triple P deposit. This ~10km northeast running shear is cross-cut by smaller faults. These intersections within the attractive conglomerate host rock appear to be what hosts the highest concentrations of gold mineralisation and form the basis for future drill targeting. The dominant shear also appears to have multiple parallel shears within close proximity to it. These parallel shears are also cross-cut by the same faults. These two features offer attractive, parallel, future drill targets. At depth, replication of mineralisation appears possible. The geological conditions discussed above are not yet changing at depth – the conglomerate host rock exists alongside the dominant shears and cross-cutting faults. Further drilling will test its extent and intensity.
2 ASX announcement 14 October 2025 “Annual Report to shareholders” 3 ASX announcement 4 August 2025 “Trident’s indicated Resource doubles”
3
ASX:CYL
This announcement has been approved for release by the Board of Directors of Catalyst Metals Limited. Investors and Media: Craig Dingley Catalyst Metals T: +61 (8) 6324 0900 [email protected] Competent Person’s Statement The information in this announcement that relates to exploration results is based on information compiled by Mr Andrew Finch, BSc, a Competent Person who is a current Member of Australian Institute of Geoscientists (MAIG 3827). Mr Finch, Geology Manager, at Catalyst Metals Ltd has sufficient experience relevant to the style of mineralisation and deposit type under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Finch consents to the inclusion in the report of matters based on his information in the form and context in which it appears. Compliance Statement The information in this announcement that relates to a Catalyst’s prior exploration results, production targets, estimates of ore reserves and mineral resources are extracted from ASX announcements referenced and available on the Company website www.catalystmetals.com.au and the ASX website (ASX code: CYL). Catalyst confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcement Catalyst confirms that all material assumptions underpinning the production target, or the forecast financial information derived from a production target, in the initial announcement continue to apply and have not materially changed.
4
ASX:CYL
Figure 1: Cinnamon cross section showing target areas within repeat conglomerate units (blue). Drill assay for CNR 308 and CNR 265 shown in inset, demonstrating continuous grade.
ASX:CYL
5
Figure 2: Cinnamon deposit showing currently identified mineralised shoots and potential repeat targets identified through recent drilling
6
ASX:CYL
Figure 3: Plutonic Gold Belt showing location of Cinnamon relative to the Plutonic processing facility
7
ASX:CYL
Appendix 1: CINNAMON COBALT DRILLHOLE DATA Azimuth (°)
End of Hole (m)
From (m)
Hole ID
Easting
Northing
RL
Cinnamon
CNR201
773289
7214069
622
-59.8
150.0
160.0
115
NSI
Cinnamon
CNR203
773375
7213867
621
-89.3
45.5
70.0
2
NSI
Cinnamon
CNR207
773418
7214153
621
-60.3
149.7
100.0
76
Cinnamon
CNR208
773343
7214037
621
-56.4
152.0
155.0
87
95
8
3.4
27.4
Cinnamon
CNR208
773343
7214037
621
-56.4
152.0
155.0
108
124
16
4.1
66.2
Cinnamon
CNR210
773658
7214093
619
-65.9
339.3
653.4
204
214
10
1.8
17.7
Cinnamon
CNR210
773658
7214093
619
-65.9
339.3
653.4
238
267.8
29.8
3.3
99.5
255
256
1
21.9
21.9
includes
Au (g/t)
Gram metres (g*m)
Project
CNR210
To (m)
Downhole Length (m)
Dip (°)
NSI
Cinnamon
CNR212A
773518
7213952
614
-64.3
339.9
631.0
266.41
290
23.59
1.7
39.9
Cinnamon
CNR213
773377
7213836
620
-65.3
339.1
215.0
157
172
15
1.1
16.8
Cinnamon
CNR233
773688
7214304
619
-70.8
160.0
237.4
196
210.91
14.91
2.1
31.5
Cinnamon
CNR236
773623
7214299
620
-69.5
151.4
336.5
208
221.5
13.5
3.9
53.2
212.8
213.5
0.7
30.4
21.3
CNR236
includes
Cinnamon
CNR236
773623
7214299
620
-69.5
151.4
336.5
240.3
258
17.7
1.5
26.0
Cinnamon
CNR236
773623
7214299
620
-69.5
151.4
336.5
261.5
267
5.5
1.9
10.6
Cinnamon
CNR239
773590
7214267
620
-68.4
154.2
270.9
202
215
13
1.4
17.6
Cinnamon
CNR239
773590
7214267
620
-68.4
154.2
270.9
246
262
16
4.5
71.7
252
253
1
34.6
34.6
243.96
251
7.04
7.8
55.2
246.6
247.1
0.5
23.8
11.9
CNR239 Cinnamon
CNR240
includes 773580
7214314
620
-65.4
156.3
CNR240
291.6 includes
Cinnamon
CNR241
773548
7214264
620
-59.5
147.2
330.5
153
Cinnamon
CNR243A
773549
7214265
620
-71.5
146.7
306.9
147
160
13
19.1
248.7
150
153
3
79.6
238.8
CNR243A
includes
NSI
Cinnamon
CNR243A
773549
7214265
620
-71.5
146.7
306.9
236
247
11
4.8
52.9
Cinnamon
CNR244
773522
7214254
620
-60.2
150.0
344.3
158
168.52
10.52
3.1
32.7
158.97
159.3
0.33
38.4
11.5
CNR244
includes
Cinnamon
CNR244
773522
7214254
620
-60.2
150.0
344.3
187.5
194.5
7
1.7
11.7
Cinnamon
CNR244
773522
7214254
620
-60.2
150.0
344.3
229.6
242
12.4
0.9
11.3
Cinnamon
CNR245
773521
7214255
620
-67.2
149.6
356.0
249.45
253
3.55
4.2
14.9
Cinnamon
CNR247
773532
7214214
620
-65.4
154.8
270.9
167.5
168.5
1
23.9
23.9
167.5
168
0.5
46.4
23.2
CNR247
includes
Cinnamon
CNR247
773532
7214214
620
-65.4
154.8
270.9
232
240
8
1.5
12.1
Cinnamon
CNR248B
773535
7214212
620
-70.9
156.2
332.9
155.7
165.62
9.92
3.9
39.1
Cinnamon
CNR248B
773535
7214212
620
-70.9
156.2
332.9
225
261
36
6.3
228.2
256
257
1
36.6
36.6
Cinnamon
CNR250
773485
7214217
624
-60.9
145.0
341.5
249
257.8
8.8
1.7
15.0
Cinnamon
CNR251A
773485
7214219
624
-67.3
143.1
374.0
187
197.31
10.31
1.8
18.7
CNR248B
includes
8
Azimuth (°)
End of Hole (m)
From (m)
To (m)
Downhole Length (m)
Au (g/t)
Gram metres (g*m)
209
3.43
3.9
13.2
Project
Hole ID
Easting
Northing
RL
Dip (°)
Cinnamon
CNR251A
773485
7214219
624
-67.3
143.1
374.0
205.57
Cinnamon
CNR252C
773463
7214218
624
-61.5
154.1
352.7
154
NSI
Cinnamon
CNR253
773466
7214281
621
-66.2
156.6
480.0
131
NSI
Cinnamon
CNR254
773497
7214162
620
-70.6
148.7
270.4
171.5
NSI
Cinnamon
CNR256A
773462
7214217
624
-67.3
144.1
379.1
227
229
2
5.1
10.3
Cinnamon
CNR256A
773462
7214217
624
-67.3
144.1
379.1
262.5
266.2
3.7
3.6
13.3
Cinnamon
CNR256A
773462
7214217
624
-67.3
144.1
379.1
285
286.5
1.5
7.6
11.4
Cinnamon
CNR257
773463
7214214
624
-71.2
152.2
414.6
274
278
4
2.6
10.6
Cinnamon
CNR258
773442
7214201
624
-61.6
151.0
368.1
278.95
282
3.05
3.5
10.8
Cinnamon
CNR258
773442
7214201
624
-61.6
151.0
368.1
289.85
296.65
6.8
2.1
13.9
Cinnamon
CNR259
773440
7214204
624
-69.1
153.3
360.8
170.6
187.16
16.56
1.1
18.7
Cinnamon
CNR259
773440
7214204
624
-69.1
153.3
360.8
280.1
289
8.9
1.3
11.3
Cinnamon
CNR260
773415
7214261
621
-62.5
150.6
440.7
244
250
6
4.8
28.7
Cinnamon
CNR261A
773393
7214201
621
-60.8
142.4
408.9
241
243
2
5.0
10.0
Cinnamon
CNR262
773394
7214200
621
-64.0
146.2
431.7
290
296.5
6.5
5.3
34.5
295
295.77
0.77
23.8
18.3
Cinnamon
CNR262 CNR262
773394
7214200
621
-64.0
146.2
includes 431.7
309
331
22
1.0
21.3
Cinnamon
CNR263
773392
7214240
621
-62.6
152.2
444.9
218.5
223.5
5
2.0
10.1
Cinnamon
CNR263
773392
7214240
621
-62.6
152.2
444.9
310.5
319.5
9
1.6
14.7
Cinnamon
CNR264
773391
7214242
621
-66.3
147.7
455.0
229
233.08
4.08
2.5
10.0
Cinnamon
CNR264
773391
7214242
621
-66.3
147.7
455.0
238.5
243
4.5
3.0
13.5
Cinnamon
CNR266A
773382
7214131
621
-66.7
148.9
368.8
159.4
160.3
0.9
11.9
10.7
Cinnamon
CNR266A
773382
7214131
621
-66.7
148.9
368.8
266.45
323.2
56.75
6.9
391.6
773386
7214133
621
-69.7
141.1
CNR266A Cinnamon
CNR267A
includes
CNR267A
390.6 includes
292
296
4
25.1
100.4
269
303.5
34.5
6.1
211.8
277.5
279
1.5
18.2
27.2
Cinnamon
CNR267A
773386
7214133
621
-69.7
141.1
390.6
308.6
334.5
25.9
1.5
39.9
Cinnamon
CNR268
773367
7214199
621
-64.5
146.8
382.5
224
225
1
19.1
19.1
Cinnamon
CNR268
773367
7214199
621
-64.5
146.8
382.5
277
278.5
1.5
6.9
10.3
Cinnamon
CNR268
773367
7214199
621
-64.5
146.8
382.5
294.12
320
25.88
1.5
38.0
Cinnamon
CNR268
773367
7214199
621
-64.5
146.8
382.5
329.5
367.57
38.07
2.6
99.4
344.68
346
1.32
12.7
16.7
Cinnamon
CNR268 CNR271
773337
7214123
622
-68.1
142.8
includes 363.8
204
211
7
2.5
17.6
Cinnamon
CNR271
773337
7214123
622
-68.1
142.8
363.8
216
229
13
1.1
14.2
Cinnamon
CNR271
773337
7214123
622
-68.1
142.8
363.8
323
335
12
2.6
31.0
Cinnamon
CNR272
773318
7214145
622
-66.9
142.6
436.5
196
199.5
3.5
13.4
47.0
196
197
1
43.9
43.9
CNR272
includes
Cinnamon
CNR272
773318
7214145
622
-66.9
142.6
436.5
202.67
216
13.33
1.4
18.1
Cinnamon
CNR272
773318
7214145
622
-66.9
142.6
436.5
334
350
16
2.5
40.5
9
Azimuth (°)
End of Hole (m)
From (m)
To (m)
Downhole Length (m)
Au (g/t)
Gram metres (g*m)
355
1
20.9
20.9
Project
Hole ID
Easting
Northing
RL
Dip (°)
Cinnamon
CNR272
773318
7214145
622
-66.9
142.6
436.5
354
Cinnamon
CNR273
773295
7214137
622
-69.4
150.5
459.5
200.5
NSI
Cinnamon
CNR275A
774357
7214765
620
-61.8
155.9
194.0
37
NSI
Cinnamon
CNR277A
774354
7214765
620
-72.0
144.3
256.7
35
NSI
Cinnamon
CNR278
774316
7214756
621
-64.3
155.4
226.7
76
82
6
2.9
17.3
Cinnamon
CNR278
774316
7214756
621
-64.3
155.4
226.7
118
130
12
0.9
11.0
Cinnamon
CNR280
774274
7214755
620
-72.1
148.5
321.5
145
150
5
2.9
14.3
Cinnamon
CNR281A
774274
7214753
620
-65.2
154.4
268.1
130
NSI
Cinnamon
CNR282A
774270
7214713
620
-64.9
150.2
216.0
6
NSI
Cinnamon
CNR284
774194
7214673
620
-70.6
148.6
278.1
54
NSI
Cinnamon
CNR287
773275
7214200
622
-64.5
152.4
507.9
268.83
274
5.17
1.9
10.0
Cinnamon
CNR287
773275
7214200
622
-64.5
152.4
507.9
323.9
326.95
3.05
4.1
12.6
Cinnamon
CNR287
773275
7214200
622
-64.5
152.4
507.9
379.36
381
1.64
9.9
16.2
Cinnamon
CNR289
773238
7214178
622
-67.5
158.4
513.7
308
310
2
6.9
13.8
Cinnamon
CNR289
773238
7214178
622
-67.5
158.4
513.7
340
349
9
3.2
29.0
Cinnamon
CNR290
773152
7214176
623
-64.2
154.8
567.4
385
NSI
Cinnamon
CNR291
773109
7214054
623
-67.9
146.8
484.0
256
NSI
Cinnamon
CNR292
773081
7214142
624
-64.3
151.4
552.0
158
166
8
4.7
37.4
158
159
1
21.1
21.1
CNR292
includes
Cinnamon
CNR293
773566
7214354
620
-66.9
148.1
480.5
262.1
NSI
Cinnamon
CNR294
773566
7214356
619
-71.9
154.9
558.6
266
NSI
Cinnamon
CNR295
773343
7214286
622
-65.2
151.1
558.9
150.5
162.1
11.6
1.4
16.5
Cinnamon
CNR295
773343
7214286
622
-65.2
151.1
558.9
305.63
324.2
18.57
5.7
105.3
312.5
313.37
0.87
38.0
33.1
Cinnamon
CNR295 CNR295
773343
7214286
622
-65.2
151.1
includes 558.9
331.2
347.24
16.04
4.1
65.8
Cinnamon
CNR295
773343
7214286
622
-65.2
151.1
558.9
444
451.7
7.7
1.6
12.2
Cinnamon
CNR296
773340
7214289
622
-69.6
157.1
638.9
412.73
420.87
8.14
4.0
32.6
Cinnamon
CNR297
773154
7214174
623
-67.5
142.1
633.5
437
450
13
1.3
17.3
Cinnamon
CNR298
773151
7214172
623
-71.6
156.6
660.6
501.26
501.76
0.5
21.9
11.0
Cinnamon
CNR299
773012
7214091
625
-68.9
150.1
639.6
162
Cinnamon
CNR302
773361
7214442
622
-59.8
149.4
1011.9
467.4
470
CNR302
includes
NSI 2.6
11.4
29.7
467.4
468
0.6
43.4
26.0
Cinnamon
CNR308
773416
7214147
621
-66.1
140.5
333.1
270.94
279
8.06
13.1
105.3
Cinnamon
CNR308
773416
7214147
621
-66.1
140.5
333.1
288.19
315
26.81
20.5
550.1
292.5
293.92
1.42
236.9
336.4
CNR308
includes
Cinnamon
CNR309
773285
7214067
622
-71.9
147.2
336.4
142
153
11
1.0
11.4
Cinnamon
CNR309
773285
7214067
622
-71.9
147.2
336.4
258
265
7
3.4
24.1
Cinnamon
CNR310A
773274
7214197
622
-64.4
145.1
408.8
263
269
6
6.9
41.3
266
267
1
35.0
35.0
CNR310A
includes
10
Azimuth (°)
End of Hole (m)
From (m)
Project
Hole ID
Easting
Northing
RL
CNR311
773641
7214228
619
-72.5
141.3
201.6
137
NSI
Cinnamon
CNR312
773565
7214352
620
-65.0
163.5
357.4
92
NSI
Cinnamon
CNR313
773618
7214346
620
-69.9
155.0
290.0
256
262.34
6.34
2.0
12.7
Cinnamon
CNR314
773340
7214117
622
-64.0
140.0
367.1
155
155.7
0.7
91.6
64.1
Cinnamon
CNR314
773340
7214117
622
-64.0
140.0
367.1
318
332.7
14.7
5.6
81.7
332
332.7
0.7
37.9
26.5
165.4
225
59.6
9.2
549.5
203
203.5
0.5
104.0
52.0
229
243
14
2.2
31.2
Cinnamon
CNR320
includes 773778
7214198
618
-66.1
293.8
773778
7214198
618
-66.1
293.8
CNR320 Cinnamon
CNR320
289.9 includes 289.9
Au (g/t)
Gram metres (g*m)
Cinnamon
CNR314
To (m)
Downhole Length (m)
Dip (°)
11
Section 1 Sampling Techniques and Data Cinnamon Deposit (Criteria in this section apply to all succeeding sections) Criteria Sampling techniques
Commentary • • • • • • • •
Drilling techniques
• •
Drill sample recovery
• • • •
Logging
• • • • • •
Sub-sampling techniques and sample preparation
• • • • • •
•
This release relates to exploration drilling results completed by Catalyst in the last 6 months. A total of 58 holes for 22,614.4m for which assays have been received (cut-off date 24/08/2026) form the basis of this Exploration Results announcement. 7 holes were drilled using Reverse Circulation drilling (RC) only to an average depth of 160m totalling 1,110m. 31 diamond tails (DD) have been completed after their RC pre-collars for a total 11,313.7m of core and 3,793m of RC. On average the precollars were drilled to 120m meters and the tails of 365m. 20 diamond holes only were drilled, either being redrilled tails or holes drilled from surface, totalling 10,190.7m with an average of 510m. Reverse Circulation holes were sampled at a 1m interval from the rig mounted cyclone. Some precollar samples weren’t sent for assay in areas known to be barren from previous drilling. The DD tails were sampled using HQ/NQ half core at 1m intervals or to geological boundaries. For DD samples, downhole depth is recorded by the drillers on core blocks after each core run. This was checked and compared to the measurements of the core. Reverse Circulation drilling was conducted utilizing a 5.75 inch face sampling bit. Diamond drilling utilised HQ core with a diameter of 63.5 mm, and NQ core with a diameter of 47.6 mm. Most RC drilling was bagged on 1m intervals and an estimate of sample recovery has been made on the size of each sample. The core was jig-sawed back together and metre marked carefully. Discrepancies to core blocks are brought up with the drill contractor. Occasionally core loss blocks are inserted. Core recovery for the diamond drilling was based on the measured core returned for each 3 m run. Overall drill core recovery is very good, with an average recovery of 99% through the mineralised zones. There is no known relationship between sample recovery and grade at Cinnamon. All holes were logged on site by a qualified geologist. Samples have been logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. Logging is both qualitative and quantitative. Logging records capture depth from, depth to, lithology, texture, colour, alteration style, alteration intensity, alteration mineralogy, sulphide percentage and type, quartz percentage, veining, and general comments. Orientated core structural measurements are taken at relevant structures and where the foliation is relatively consistent. All DD core is digitally photographed. Most of the RC samples were dispatched to Bureau Veritas (BV) laboratory in Perth for gold fire assay analysis and a couple of submissions went to SGS laboratory in Perth for the same method. Half cut diamond core was sampled on 1m intervals or to geological contacts, with sample lengths varying between 0.1 m to 1.1 m. Whole-core sampling is used in broken or sheared zones to address potential grade bias associated with half-core grab sampling in these intervals. NQ core samples have been sent to Plutonic onsite lab (PLUTO). When the core is oxidised, it is assayed FA40 while when it is fresh it is assayed PAL. Sample preparation procedures for RC samples includes: o 1-4 hours drying at 105°C depending on moisture content o Riffle splitting to obtain between 1.2 to 3kg of sample. o Pulverising to a particle size of 85% passing 75µm. Sample preparation procedures for DD includes: o 1-4 hours drying at 105°C depending on moisture content o Entire core sample is crushed to a particle size of 85% passing 3.15mm. o Riffle splitting to get a sample of max 2kg. o For samples going through FA40, pulverising to a particle size of 85% passing 75µm.
12
Criteria
Commentary •
Quality of assay data and laboratory tests
• • • • • • • • •
Verification of sampling and assaying
• • •
Location of data points
• • • •
Data spacing and distribution
• • • • •
Orientation of data in relation to geological structure
• • •
Sample security
• • • •
Sample preparation protocols and sample sizes are considered appropriate for the style of mineralisation encountered and should provide representative results. Samples analysed at SGS Laboratory using a 50 g Fire Assay method (GO_FAP50V10). Samples analysed at Bureau Veritas Laboratory using a 50 g Fire Assay method (FA001) Samples analysed at Plutonic onsite laboratory are either using a 40g Fire Assay method (FA40) or using PAL method (PAL_DIBK). The Pulverising and Leach (PAL) method is not considered to be a total gold analysis, however the larger sample size still produces a representative result. Certified Reference Material (CRM) was submitted every 20 samples. CRMs are of similar grade tenor to those expected grades in the sampling and were selected based on their grade range and mineralogical properties with an emphasis on sulphide ores. Blanks are inserted every 100 samples in RC submissions and every 20 samples in DD submissions.. Field duplicates were inserted every 20 samples in RC submissions. Coarse crush duplicates samples were performed every 20 samples in DD submissions. Crush sizing analysis is conducted randomly by the Laboratory as part of their QC process. Pulp residues are expected to have 90% passing ≤75μm. This data is monitored by the Laboratory Supervisor. Grind times can be lengthened accordingly. Current procedures dictate a process of validation and checking of laboratory results when data is returned by the laboratory as it is loaded into the independently managed Quest database. A standard set of plots and checks are undertaken, and if results fall outside of the expected limits, then re-assaying is requested. QAQC reports are generated by the database administrator and documented from automated routines out of the database Drilling data was verified by the geologist first and then the Database Administrator before importing into the main Quest database (proprietary database system). Logging is completed electronically on laptops. Database protocols and rules are applied upon data entry. All drill data within site databases are regularly validated using both internal database systems and external validation tools. All drill collars have been accurately located using DGPS. Downhole survey data was collected using an Axis Mining Technology Champ North Seeking Gyro tool. Surveys are undertaken on 30m intervals as the tool is removed from the holes once the hole is completed. The diamond holes used NSGY tool with surveys collected on 5m intervals. Downhole surveys are visually inspected for anomalous changes in drill trace, (i.e does the drill hole apparently bend inordinately). At Cinnamon, resource infill drilling on a nominal 25m grid spacing was undertaken on the HighGrade Shoot to confirm both geological and grade continuity along the main mineralised trend. Resource definition drilling of domain 3001 was completed on a nominal 50 x 50m drill spacing. Resource extension drilling of Jalapeno zone was completed on a nominal 100 x 100m drill spacing. Cinnamon Deep program was completed along a 550m strike length at a nominal 150m section spacing. Resource definition drilling at Cobalt was conducted on a nominal 50 x 50m drill spacing in the SW portion of the deposit. The orientation of a majority of the drilling is approximately perpendicular to the strike and dip of the mineralisation and is unlikely to have introduced any sampling bias. Certain holes have drilled parallel to key structures, in particular 3 scissors holes were collared from the southern part of the deposit to test the high-grade continuity of the main mineralized trend. The density of drilling and drilling on other orientations has allowed detailed geological modelling of these structures and hence any sampling bias in a single hole has been removed. The chain of custody is managed by Catalyst employees and contractors. Samples were bagged and labelled by company geologists or geological assistants and sealed in bulk bags with a security seal that remains unbroken when delivered to the lab. Once a hole has been sampled, the sample intervals and checked geology documents are uploaded into the Quest database system managed by EarthSQL. The independent Database Administrator (DBA) merges the validated drilling data with the
13
Criteria
Commentary certified laboratory assay files where validation routines for QAQC are completed before database exports and reports are issued. • Catalyst samples were stored on site and delivered to the laboratories in Perth by a Contracted Transport Company. Consignment notes were used place to track the samples. Operator sample security is assumed to be consistent and adequate. • A review of standards, blanks and duplicates indicate sampling and analysis has been completed appropriately with no significant issues discovered. • Historical reviews of the database for the Marymia area have been examined previously and a proportion of holes were compared to original data sources and found to be consistent wherever checked.
Audits or reviews
Section 2 Reporting of Exploration Results Cinnamon Deposit (Criteria listed in the preceding section also apply to this section) Criteria Mineral tenement and land tenure status
Exploration done by other parties
Commentary • • • • • • •
• • •
•
• • • • Geology
• •
Located in the Marymia - Plutonic Greenstone Belt ~200 km northeast of Meekatharra in the Midwest mining district in WA The Cinnamon drilling campaign occurred on: o M52/228 - granted tenement in good standing. o M52/229 - granted tenement in good standing. The tenements predate Native title interests but is covered by the Gingirana Native Title claim. The tenements are 100% owned Catalyst Metals Ltd. Gold production will be subject to a 2.5% government royalty. Approximately 15 phases of RAB and aircore drilling have been completed across the Cinnamon Prospect since July 1989. RAB and aircore drilling intersected both lateritic and supergene gold mineralisation over 5.75km NE-SW along the Avery Fault corridor. The Cinnamon Laterite pit was exploited for gold mineralisation in the basal nodular gravels of the transported laterite. Rock-chips taken from quartz veining and haematitic indurated saprolite from a “good-bye cut” at the southern end of the laterite pit returned assay results of 31g/t and 11g/t, respectively. These results suggest mineralised structures beneath the transported laterite may be responsible for the enriched gold-in-laterite. The RC drilling prior to 2001 undertaken by Resolute was generally drilled to test directly under better RAB intersections. Several discrete pods were defined but the orientation of high-grade mineralised zones remains poorly understood. Barrick Gold took over the project from Resolute and completed several phases of RC drilling. In 2001, seventeen RC holes on 40m, 80, 160m and 320m spaced traverses were drilled as a broad test of the northeastern portion of the Cinnamon Prospect. The holes were designed to test for a large mineralised system at depth. The holes returned several broad low-grade zones and several narrow high-grade intersections but failed to establish a large source for the system. Development drilling 2002 consisted of 253 RC holes for 20,218 metres and 2 diamond Geotechnical holes for 295.30 metres. The drilling was staged and targeted at the known mineralised zones depicted in earlier drilling. First pass hole spacing was 40 x 40m around known mineralisation which would be closed to 20 x 20m if significant mineralisation intersected. Further infill & lateral extension drilling in 2003-2004 was completed with 181 holes RC for a total of 17,581m and 11 RC/DD holes for a total of 2,756.86m. 34 RC holes were added in 2010-2011 for a total of 4733m as infill drilling in the main mineralised zones. Vango Mining completed 4 RC/DD hole in 2018 for a total of 1137.9m in the main mineralized zone. Catalyst consolidated the Marymia belt in 2023 following the successful acquisition of Vango Mining and the merger with Superior Gold Inc. Marymia mineralisation is structurally controlled, orogenic, mesothermal (amphibolite metamorphic facies) in style, associated with the late tectonic D3 high-angle thrusting event and open folding/flexing and dilation of earlier - including D1/D2 thrusts. Gold mineralisation at Cinnamon is hosted within shear zones within conglomerates with felsic clasts within a mafic derived matrix. High grade zones are located in flexures of the shear zones.
14
Criteria Drill hole Information Data aggregation methods
Commentary •
A table of drill hole data pertaining to this release is attached.
• •
• • • •
Reported drill results are uncut and reported above a nominal 10 gram-metre intercept. All relevant intervals to the reported mineralised intercept are length weighted to determine the average grade for the reported intercept. All significant intersections were compiled using a lower cut-off grade of 0.5 g/t Au including a maximum of 3m of internal dilution. Where individual intervals are below this cut off and have a gold grade of less than 10 gram-metres they are reported as being a Not Significant Intercept (NSI). High-grade results greater than 20 g/t Au were aggregated using length weighting and reported as separate intervals. No top cuts were used in reporting the drill results No metal equivalents are reported. Drilling is orientated as close to perpendicular to mineralisation where possible. Downhole intercept lengths are reported for this phase of drilling.
•
Appropriate diagrams are included in the report as plans, cross sections and isometric views.
• • •
All holes being reported are included in the tables. Diagrams show the location and tenor of both high and low grade samples. No additional exploration data is included in this release.
•
Resource definition, infill and extensional drilling programs are underway, and will continue in line with mine development requirements.
• •
Relationship between mineralisation widths and intercept lengths Diagrams Balanced reporting Other substantive exploration data Further work
15
Figure 4: Cinnamon plan view with representative long section location
16
Figure 5: Cinnamon long section
17
ASX Announcement 31 August 2026
Catalyst Metals’ flagship asset is the 40km long Plutonic Gold Belt in Central Western Australia. This belt currently produces ~100koz pa at a target AISC of A$2,800/oz from three mines at Plutonic Main Plutonic East and K2. Catalyst is currently bringing three new mines into production – Trident UG, Cinnamon & Old Highway. Each will be processed through the existing, underutilised and centrally located 2Mtpa CIL processing plant. Exploration is targeting down dip extensions of each of these deposits. With the development and exploration of these five deposits, Catalyst aims to increase Reserves and production from 1.5Moz to ±2Moz and ±100koz to ±200koz annually. In so doing, Catalyst is aiming for Plutonic to have a 10 year mine life - a unique and rare proposition for an underground Western Australian gold mine. Catalyst also controls a processing plant and +75km of strike length immediately north of the historic +22Moz Bendigo goldfield. Here, Catalyst has delineated a high-grade, greenfield resource at 26 g/t Au. Further discoveries along strike are expected.
FY26 Financial Results • FY2026 was a year of significant investment for Catalyst - focussed on delivering Plutonic’s ten year, ±200koz pa organic growth strategy • New mines developed during the year provided additional ore sources and helped Catalyst deliver record production and financial performance2 • Full year financial highlights include: o 104koz of gold production; delivered from four operating mines o Record revenue of A$632 million; a 39% increase compared to the prior year o Record EBITDA of A$303 million; a 57% increase o Record profit before tax of A$243 million; a 59% increase o Record profit after tax of A$171m, a 43% increase o Strengthened balance sheet with cash and bullion of A$331 million3
• Operating cash flows of A$278 million allowed Catalyst to re-invest in its ±200koz pa growth strategy • Catalyst remains debt free, however post-year end, increased its available debt facility to A$200m, providing additional liquidity to pursue its growth plans Catalyst Metals Limited (Catalyst or the Company) (ASX:CYL) is pleased to report its full year financial results for FY2026. Further information is provided in the Appendix 4E and financial statements released today. FY2026 was a year of significant growth and investment across the Plutonic Gold Belt. The results for FY2026 reflect that investment. Record Plutonic production of 104koz was made possible due to new mines (Plutonic East, Keillor and Trident open pit) being developed, providing additional ore sources to the underutilised processing plant. A strong operating performance in a buoyant gold price environment generated operating cashflows of A$278m. This allowed Catalyst to self-fund its growth projects and exploration program while continuing to strengthen its balance sheet. Cash and bullion at 30 June 2026 was A$331m, an increase of A$101m from 30 June 2025.
Capital Structure
Catalyst’s MD & CEO, James Champion de Crespigny, said:
Shares o/s: 261m Options: 0.1m Rights: 11.9m Cash & Bullion: A$331m Debt: Nil
“FY2026 has been year of significant activity across the Plutonic Belt. We are pleased to be able to report a record year of production and financial performance. While the gold price has contributed, the delivery and ramp up of new mines has provided the ore sources to achieve these results.
Reserve and Resource1 MRE: 4.5Moz at 3.3g/t Au ORE: 1.5Moz at 2.6g/t Au
This growth will continue in the coming years as we develop and ramp up Trident underground, Old Highway and Cinnamon. As these new ore sources become available, Plutonic will be in a position to build stockpiles ahead of the processing plant, allowing stable, consistent quarterly production.“
Corporate Details ASX: CYL E:[email protected] om.au
ASX:CYL
Note 1: MRE includes Indicated Resources of 32.9Mt at 23.3g/t for 3.4Moz and Inferred Resources of 9Mt at 2.7g/t for 0.8Moz. ORE includes probable Reserves of 18.1Mt at 2.6g/t for 1.5Moz. Refer to ASX announcement 14 October 2025 “Annual Report to Shareholders” Note 2: Production comparison is Plutonic only – Henty production in FY2025 not included 1 Note 3: Cash and bullion valued at 30 June 2026 and 30 June 2025 spot prices respectively. Financial statements value at lower of cost or net realisable value
Financial Results Plutonic’s operating results in FY2026 were supported by a buoyant gold price. This contributed to a group net profit after tax (NPAT) of A$171 million and EBITDA of A$303 million. At 30 June 2026 Catalyst held cash and bullion2 of A$331 million and remained debt free. In August 2026, Catalyst expanded its revolving credit facility from A$100m to A$200m – this remains undrawn but provides available liquidity1 of A$531m to support growth. Table 1: Full year results Unit
oz
FY2026 (A$’000) 103,761
FY20253 (A$’000) 86,384 21,634
Change (%) 20%
Total Gold Sales (ounces)
A$'000
99,359
107,036
Revenue
A$'000
631,938
453,089
39%
EBITDA
A$'000
302,734
193,092
57%
Profit before tax (PBT)
A$'000
242,665
152,613
59%
Income tax expense
A$'000
(71,545)
(33,341)
115%
Net profit after tax (NPAT) Cash and bullion2
A$'000
171,120 331,314
119,272 230,490
43% 44%
Plutonic Production Henty Production (sold in May 2025)
oz
A$'000
1 Liquidity is calculated as Cash and bullion (bullion at spot prices) and all undrawn facilities 2 Cash and bullion valued respectively at 30 June 2026 and 30 June 2025 spot prices. Financial statements value at lower of cost or net realisable
value
3 Comparative information includes discontinued operations
ASX:CYL
catalystmetals.com.au
2
This announcement has been approved for release by the Board of Directors of Catalyst Metals Limited.
Investors and Media: Craig Dingley Catalyst Metals T: +61 (8) 6324 0900 [email protected]
JORC 2012 Mineral Resources, Ore Reserves The information in this announcement that relates to a Catalyst estimates of ore reserves and mineral resources are extracted from ASX announcements referenced and available on the Company website www.catalystmetals.com.au and the ASX website (ASX code: CYL). Catalyst confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcement. Catalyst confirms that all material assumptions underpinning the production target, or the forecast financial information derived from a production target, in the initial announcement continue to apply and have not materially changed.
ASX:CYL
catalystmetals.com.au
3
Catalyst Metals Limited Appendix 4E Preliminary final report
- Company details Name of entity: ABN: Reporting period: Previous period:
Catalyst Metals Limited 54 118 912 495 For the year ended 30 June 2026 For the year ended 30 June 2025
- Results for announcement to the market 2026 $'000
2025 $'000
Change $'000
Revenues from ordinary activities (including discontinued operations)
631,938
453,089
178,849
39%
Profit from ordinary activities after tax attributable to the Owners of Catalyst Metals Limited (including discontinued operations)
171,120
119,272
51,848
43%
Profit for the year attributable to the Owners of Catalyst Metals Limited (including discontinued operations)
171,120
119,272
51,848
43%
2026 Cents Basic earnings per share Diluted earnings per share
66.25 64.37
Change %
2025 Cents 52.27 50.12
Dividends There were no dividends paid, recommended or declared during the current financial period. Comments The profit for the Consolidated Entity after providing for income tax amounted to $171,120,000 (30 June 2025: $119,272,000). 3. Net tangible assets Reporting period Cents Net tangible assets per ordinary security
- Loss of control over entities Not applicable.
- Dividends Current period There were no dividends paid, recommended or declared during the current financial period. Previous period There were no dividends paid, recommended or declared during the previous financial period.
278.71
Previous period Cents 189.39
Catalyst Metals Limited Directors' report 30 June 2026 6. Details of associates and joint venture entities The Group has the following direct interests in associates and joint venture entities:
Principal place of business / Country of incorporation
Name Kaiser Reef Limited Bryah Basin Joint Venture Four Eagles Joint Venture Boort Joint Venture Macorna Bore Joint Venture Tandarra Joint Venture Sino Australian Resources (Laos) Co. Ltd - Joint Venture entity Golden Camel Joint Venture
Australia Australia Australia Australia Australia Australia Laos Australia
Ownership interest 2026 %
Ownership interest 2025 %
19.60% 80.00% 50.00% N/A N/A N/A
19.99% 80.00% 50.00% 50.00% 50.00% 51.00%
N/A N/A
49.00% 50.10%
- Foreign entities Details of origin of accounting standards used in compiling the report: Superior Gold Inc. prepare their accounts under accounting standards that are equivalent to International Financial Reporting Standards.
- Audit qualification or review Details of audit/review dispute or qualification (if any): The financial statements have been audited and an unmodified opinion has been issued.
- Attachments Details of attachments (if any): The Annual Report of Catalyst Metals Limited for the year ended 30 June 2026 is attached.
- Signed
Signed ___________________________
Date: 31 August 2026
Mark Connelly Chairman
2
2026
ANNUAL FINANCIAL REPORT
For the year ended 30 June 2026 ABN 54 118 912 495
Catalyst Metals Limited Directors' report 30 June 2026
Table of contents Directors’ Report Remuneration Report Other Directors’ Report statutory disclosures Auditor’s independence declaration Sustainability Report Directors’ Declaration on sustainability report Independent auditor’s review report on the sustainability report General information on the Financial Report Consolidated Statement of profit or loss and other comprehensive income Consolidated Statement of financial position Consolidated Statement of changes in equity Consolidated Statement of cash flows Notes to the consolidated Financial Statements Consolidated entity disclosure statement Directors’ Declaration Independent auditor’s report
4
Page 5 18 35 37 38 58 59 65 66 68 69 70 71 113 114 115
Catalyst Metals Limited Directors' report 30 June 2026 DIRECTORS REPORT The Directors present their report, together with the financial statements, on the consolidated entity (referred to hereafter as the 'Consolidated Entity' or 'Catalyst' or 'Group') consisting of Catalyst Metals Limited (referred to hereafter as the 'Company' or 'Parent Entity') and the entities it controlled at the end of, or during, the year ended 30 June 2026. DIRECTORS The following persons were Directors of Catalyst Metals Limited during the whole of the financial year and up to the date of this report, unless otherwise stated: Mark Connelly - Independent Non-Executive Chairman (Appointed 2 March 2026) David Jones AM - Independent Non-Executive Chairman (Resigned 2 March 2026) James Champion de Crespigny - Chief Executive Officer and Managing Director Bruce Kay - Non-Executive Director Robin Scrimgeour - Independent Non-Executive Director Anna Shave - Independent Non-Executive Director (Appointed 8 September 2025) COMPANY SECRETARY Emma Wates Chelsea Sheridan (Resigned 20 May 2026) PRINCIPAL ACTIVITIES During the financial year the principal continuing activities of the Consolidated Entity consisted of: ● ● ●
Mineral exploration and evaluation Mine development Production of gold
DIVIDENDS There were no dividends paid, recommended or declared during the current or previous financial year. REVIEW OF OPERATIONS The profit for the Consolidated Entity after providing for income tax amounted to $171,120,000 (30 June 2025: $119,272,000). Overview FY26 was Catalyst’s third year of ownership of the consolidated Plutonic Gold Belt. The focus during the year was to deliver production safely while executing the projects required to deliver its strategy of delineating ±2Moz of Reserves to underwrite an increased ±200koz gold production per annum for ±10 years. Broadly, there are three limbs required to deliver this strategy: ● Develop new mines to provide additional ore sources; ● Grow Reserves and mine life through exploration; and ● Re-invest in supporting infrastructure. This strategy will see the Plutonic Gold Belt operate under a hub and spoke model, with multiple mines feeding a central processing plant. Mining rates are expected to allow stockpiles to be developed, allowing a stable and consistent ±200koz per annum production rate to be sustained. The number of operating mines increased to four during the year. Plutonic Main remains an important base load ore source and continued to produce in line with expectations. Plutonic East ramped up to full production rates during the year. Keillor (formerly K2) followed a similar development strategy to Plutonic East, being a historic development, and was brought into production in the June 2026 quarter. Trident is a greenfield development, and Catalyst successfully completed the open pit during the year. The open pit provides access for the underground portal and decline, development of which commenced in June 2026. The Trident underground will be the fourth new mine developed by Catalyst on the Plutonic Gold Belt.
5
Catalyst Metals Limited Directors' report 30 June 2026 The fifth and sixth mines are Old Highway and Cinnamon. These are relatively new to the portfolio – Old Highway having been acquired in May 2025 and the Cinnamon underground zone having been discovered in January 2026. Approvals workstreams for these developments progressed during the year. Investment in infrastructure to support the future expanded production continued during the year. This included refurbishment of the gas-fired power station, and the expansion of the Plutonic camp, both of which were largely completed. The refurbishment of the processing plant progressed, including the replacement of two crushers. Investment into the processing plant will continue through FY2027. Much of this investment in infrastructure is legacy capital spend, owing to underinvestment by prior owners. An +A$80 million exploration programme ran throughout the year. The objectives of the programme were to target downdip extensions of known deposits to grow Resources and Reserves, and to test underexplored parts of the Plutonic Gold Belt. The programme delivered a material increase in the Trident underground Resource to 1.1Moz at 5.4g/t Au, a new high-grade discovery beneath Cinnamon, and depth extensions at Old Highway. In September 2025, Catalyst reported an updated Ore Reserve of 1.5 million ounces. This represents a tripling of Reserves across the Plutonic Gold Belt under Catalyst’s ownership and is a significant step toward the ±2Moz Reserve target. Alongside this investment in projects, infrastructure and exploration, Catalyst continued to strengthen its balance sheet. A A$100 million revolving credit facility was established in July 2025 and over A$100 million of cash (and bullion) was added to the balance sheet through operational, after-tax cashflows. The Company ended the year debt free with total liquidity of A$431 million. Catalyst was admitted to the S&P/ASX 200 Index in the September 2025 rebalance, effective 16 September 2025. Operational Summary Group gold production for FY26 was 103,761 ounces, in line with guidance of 100,000 to 110,000 ounces (FY25: 86,384 ounces from Plutonic and 21,634 ounces from Henty). This was the highest annual production for the Plutonic Gold Belt under Catalyst’s ownership and reflects the multiple ore sources being available. Gold sales for the year totalled 99,359 ounces at an average realised price of A$6,351 per ounce. All-In Sustaining Cost (AISC) for the year was A$2,738 per ounce sold, below the revised guidance range of A$2,750 to A$2,950 per ounce (FY25: A$2,495 per ounce across all operations). Plutonic Operations Ore mined (t) Mine grade (g/t Au) Ore processed (t) Recovery (%) Gold produced (oz) Gold sold (oz) Realised price (A$/oz) AISC – produced (A$/oz) AISC – sold (A$/oz)
Sep 25 Qtr Dec 25 Qtr Mar 26 Qtr Jun 26 Qtr 333,584 521,612 402,713 310,527 2.1 2.6 2.3 2.9 298,280 390,614 380,959 385,052 85.8 86.6 86.4 89.0 17,572 28,176 26,127 31,886 20,740 24,846 23,903 29,870 5,295 6,322 7,014 6,492 2,877 2,565 2,901 2,666 2,877 2,776 2,853 2,734
12 mth to Jun 26 1,568,436 2.5 1,454,905 87.2 103,761 99,359 6,351 2,747 2,738
Environment, Social and Safety Safety The twelve-month rolling Total Recordable Injury Frequency Rate (‘TRIFR’) rose from 6.3 at 30 June 2025 to 10.4 at 30 June 2026. This follows two consecutive years without a lost time injury under Catalyst’s ownership. Plutonic’s operational workforce, including contractors, has expanded as new mines are developed and capital projects undertaken. Reinforcing safety standards and proactive safety measures remains a focus for the Company. Catalyst remains committed to achieving a zero-harm workplace and continues to invest in training to support safe growth.
6
Catalyst Metals Limited Directors' report 30 June 2026 Environment Environmental management practices continued to be strengthened through FY26 as activity across the Plutonic Gold Belt increased. Key focus areas included water management and dewatering at the operating mines and new developments, tailings and waste management, biodiversity conservation and progressive rehabilitation. There were no instances of non-compliance with the Consolidated Entity’s licence conditions during the year and no material environmental incidents were recorded. Catalyst continues to engage closely with local communities, regulators and other stakeholders, fostering relationships built on transparency and mutual respect. Cultural Heritage Management and First Nations People Engagement Catalyst acknowledges the Gingirana, Yugunga Nya, and Nharnuwangga Wajari Ngarlawangga Traditional Owner Groups, on whose country we explore and operate. In FY26, Catalyst took steps to strengthen its approach to Cultural Heritage Management and engagement with these groups and to continuously improve how we consult and collaborate to ensure that cultural heritage is respected and protected. Throughout the reporting period, Catalyst continued to work with Traditional Owners. Catalyst is committed to listening, learning, and working together to develop enduring agreements and partnerships that support the protection of cultural values, participation by First Nations people and the long-term sustainability of our operations. Plutonic Project Development Catalyst’s near-term strategy is to grow the Plutonic Gold Belt Reserves from approximately ±1.5 million ounces to ±2 million ounces, underwriting production of ±200,000 ounces per annum for ten years from six mines: Plutonic Main, Plutonic East, Trident, Keillor (K2), Old Highway and Cinnamon. Mining from these ore sources is expected to allow Catalyst to build stockpiles ahead of production, allowing stable, consistent production. Existing infrastructure and sunk capital across the belt — the processing plant, a 40-kilometre haul road, gas-fired power plant, airstrip and established declines at three of the six mines — materially lowered the capital cost and lead time of each development.
- Plutonic Main and Plutonic East Plutonic Main remains the belt’s foundation asset and provides the base load of ore to the processing plant. Underground exploration continued from dedicated drill drives in the Timor and Baltic Extension zones. Delineating near-term, virgin ore sources in these areas will allow Plutonic to move away from a sole reliance on remnant mining. Plutonic East, located 3 kilometres east of the Plutonic mine, was brought online in March 2025 and continued to ramp up through FY26.
- Trident Trident, 30 kilometres north-east of the processing plant, is the belt’s second largest deposit and Catalyst’s first greenfield development. Open pit mining commenced in the September 2025 quarter and was completed in May 2026. Open pit performance was in line with expectations. Open pit stockpiles will be progressively processed during the CY2026 year. Portal establishment and decline development commenced following completion of the pit. First stoping ore from the underground mine is expected in the first half of CY2027. Grade control drilling for the first 12 to 15 months of underground production was completed during the year and is expected to de-risk the underground ramp up. Once fully ramped-up, Trident will be producing 60,000 to 80,000 ounces per annum. This will form a second, higher-grade base load ore source. Drilling through the year increased the Trident underground Mineral Resource to 1.1 million ounces at 5.4g/t gold, including Indicated Resources of 633,000 ounces at 6.3g/t gold. A Reserve update is expected in September 2026.
7
Catalyst Metals Limited Directors' report 30 June 2026 3. Keillor (formerly K2) Keillor, 40 kilometres north-east of the processing plant, has an underground Resource of 81,000 ounces at 3.6g/t gold and a Reserve of 20,000 ounces at 4.3g/t gold, informed largely by drilling from the late 1990s. Development mirrored the Plutonic East pathway — dewatering, decline rehabilitation, then ramp up — using the portal and decline established in the late 1990’s. As with Plutonic East and Trident, upfront investment in grade control drilling at Keillor has been undertaken to de-risk the first 12-15 months of production. Given the limited historical drilling, Keillor is considered under-explored and expansionary drilling is underway. 4. Old Highway Old Highway is located 40 kilometres south of the processing plant on the Great Northern Highway and sits on existing mining leases. It has a Mineral Resource of 206,000 ounces at 3.0g/t gold, including an underground component of 140,000 ounces at 4.6g/t gold, and a maiden Ore Reserve of 140,000 ounces at 3.2g/t gold declared in September 2025. This Reserve underpins a four-year mine life at approximately 35,000 ounces per annum. During the year Catalyst progressed Old Highway’s mining approvals with development expected to commence in CY2027. Drilling at Old Highway is seeking to double the current four year mine life to eight years by targeting down-dip extensions to the ore body. In February 2026, Catalyst announced drilling results, including 26 metres at 5.9g/t gold, 300 metres below the existing Resource, demonstrating the ore body has potential to extend at depth. 5. Cinnamon Cinnamon was not contemplated in Catalyst’s ten year, ±200,000 ounces per annum plan. Drilling through FY26 changed that position. Drilling beneath the existing open pit Resource delineated a new high-grade zone, which is currently 700 metres long and remains open along strike and down dip. Future exploration programmes will target repeat high-grade zones, both parallel and beneath the newly discovered zone. This exploration success has led Catalyst to progress studies and approvals for Cinnamon as a potential sixth ore source. Plutonic Exploration Catalyst conducted an A$80 million exploration programme during FY26 with two objectives: growing Reserves and extending mine lives by targeting down-dip extensions of known deposits, and testing previously underexplored areas of the belt. Surface drilling focused on Trident, Old Highway, Cinnamon and Keillor. Underground drilling continued at Plutonic from dedicated drill drives. In February 2026 Catalyst agreed to acquire approximately 1,100 square kilometres of exploration tenements in the Bryah Basin, a neighbouring gold belt. The acquisition creates an almost contiguous 190-kilometre tenement package surrounding the central Plutonic processing facility. The Bryah Basin’s endowment, fragmented ownership history, limited exploration and proximity to existing processing infrastructure make it an attractive exploration opportunity. Victorian Exploration Catalyst controls a 75-kilometre tenement package immediately north of and along strike from the historic 22 million ounces Bendigo Goldfield, together with an option to acquire a 50 per cent interest in the permitted Maldon processing facility, 100 kilometres south of the Four Eagles Gold Project. In November 2025, Catalyst acquired the remaining 49 per cent interest in the Tandarra Gold Project, consolidating 100 per cent ownership of its position on the Bendigo Belt. Drilling continued on the Tomorrow, Macnaughtan and Lawry structural corridors.
8
Catalyst Metals Limited Directors' report 30 June 2026 Four Eagles Gold Project Four Eagles comprises a Mineral Resource of 163,000 ounces at 7.7g/t gold, including the Iris Zone of 70,000 ounces at 26g/t gold. In October 2025, Resources Victoria approved the Work Plan for the proposed exploration tunnel at Boyd’s Dam. This was an important approval milestone for the project and provides a pathway to explore the high-grade positions from underground, at lower cost and year-round. Financial Position and Capital Management The Group generated net cash from operating activities of A$277.6 million (FY25: A$196.1 million). This operating cashflow allowed Catalyst to self-fund its growth and exploration programmes. Cash and bullion at 30 June 2026 was A$331 million 1, an increase of A$101 million on the A$230 million held at 30 June 2025. The Group remains debt free. During the year, Catalyst secured a A$100 million revolving corporate facility. This remains undrawn and, with existing cash, provided liquidity at year end of A$431 million. Revenue from continuing operations for the year was A$631.9 million (FY25: A$361.4 million) and profit after income tax was A$171.1 million (FY25: A$119.3 million). Basic earnings per share were 66.25 cents (FY25: 52.27 cents). Net assets at 30 June 2026 were A$700.1 million (30 June 2025: A$470.7 million). JORC 2012 MINERAL RESOURCES, ORE RESERVES AND PRODUCTION TARGETS The information in this review of operations that relates to estimates of Mineral Resources, Ore Reserves and production targets are extracted from the ASX announcements listed below and which are available on the Company’s website www.catalystmetals.com.au and the ASX website (ASX:CYL). Date
Announcement title
15 June 2023 6 August 2024 11 October 2024 31 January 2025 8 May 2025 4 August 2025
Maiden Mineral Resource of 163,000oz at Four Eagles project Plutonic East and K2 Mineral Resource Annual Update of Mineral Resources and Ore Reserves Statement K1 and K3 Mineral Resource Catalyst acquires Old Highway Gold Project Trident’s Indicated Resource doubles putting Catalyst on the path to 200,000oz annual gold production Plutonic Belt Reserves double to 1.5Moz, supporting long term growth plans 33m at 7.4 g/t gold intersected below Cinnamon Resource Catalyst discovers new high-grade zone below Cinnamon Resource Drilling at Old Highway gold deposit demonstrates growth potential at depth Drilling at Trident continues to extend mineralisation Cinnamon underground strike length grows to 700m with 38m @ 10.5g/t Au Drilling at Old Highway’s Resource extension targets confirms potential for growth Catalyst increases future processing optionality with study to expand Plutonic Mill Trident’s Resource grows to 1.1Moz at 5.4g/t
10 September 2025 23 October 2025 19 January 2026 18 February 2026 7 May 2026 13 May 2026 15 May 2026 19 May 2026 23 June 2026
Catalyst confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcements. Catalyst confirms that all material assumptions underpinning the production targets, or the forecast financial information derived from a production target, in the initial public report continue to apply and have not materially changed.
1 Includes 3,710 ounces of gold bullion on hand valued at A$5,867 per ounce as at 30 June 2026 9
Catalyst Metals Limited Directors' report 30 June 2026 SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS There were no significant changes in the state of affairs of the Consolidated Entity during the financial year, with the exception of:
Catalyst was admitted to the S&P/ASX 200 Index effective 16 September 2025;
In August 2025, the Company issued 2,500,000 shares to Collins Street Asset Management Pty Ltd in full and final settlement of Federal Court proceedings, including the release of all security interests held over the assets of the Company and its subsidiaries;
In September 2025, Catalyst reported an updated Ore Reserve for the Plutonic Gold Belt of 1.5 million ounces, a doubling of the Ore Reserve reported in the prior year;
Following the Annual General Meeting held on 13 November 2025, RSM Australia Partners resigned as auditor of the Company and PricewaterhouseCoopers was appointed as auditor;
In November 2025, Catalyst acquired the remaining 49% interest in the Tandarra Gold Project for A$1.3 million, taking its interest to 100 per cent;
In November 2025, Catalyst settled an inherited legal dispute concerning tenements in a key area of the Plutonic Gold Belt. The settlement included the surrender of the counterparties’ 4.1 per cent interest in a tenement and the extinguishment of royalty and trailing payment obligations relating to future production (refer to Note 10 to the financial statements);
During the second half of the year, Catalyst agreed to acquire exploration tenements in the Bryah Basin from Star Minerals Limited and Albright Metals Limited, taking its landholding in the region to over 2,280 square kilometres;
The Trident open pit and the Keillor underground mine were brought into production, taking the number of operating mines on the Plutonic Gold Belt to four, and development of the Trident underground mine commenced; and
Mr Mark Connelly was appointed Independent Non-Executive Chairman on 2 March 2026 in succession to Mr David Jones AM, and Ms Anna Shave was appointed an Independent Non-Executive Director on 8 September 2025.
MATTERS SUBSEQUENT TO THE END OF THE FINANCIAL YEAR No matter or circumstance has arisen since 30 June 2026 that has significantly affected, or may significantly affect the Consolidated Entity’s operations, the results of those operations, or the Consolidated Entity’s state of affairs in future financial years, with the exception of:
On 9 July 2026, Catalyst announced that it had entered into gold forward contracts for 30,000 ounces of gold at a fixed price of A$6,075 per ounce, with deliveries spread evenly over 15 months at 2,000 ounces per month commencing August 2026; and
On 14 August 2026, Catalyst announced that it had entered into an additional A$100 million debt facility. This is in addition to the existing A$100 million facility, taking the total credit facility to A$200 million. The terms of the new facility are in line with the existing facility. The tenor of the overall facility has been extended to four years.
LIKELY DEVELOPMENTS AND EXPECTED RESULTS OF OPERATIONS Information on likely developments in the operations of the Consolidated Entity and the expected results of operations have not been included in this report because the Directors believe it would be likely to result in unreasonable prejudice to the Consolidated Entity.
10
Catalyst Metals Limited Directors' report 30 June 2026 MATERIAL BUSINESS RISKS Catalyst operates in an uncertain economic environment, which can impact its ability to deliver results in accordance with its strategic plan and objectives. Its financial results are subject to various risks and uncertainties, which may not be within the reasonable control of the Consolidated Entity. The material business risks, which may have a material adverse impact on the Consolidated Entity’s business, results and prospects for future financial years include: Gold Prices The Consolidated Entity generates revenues and cashflows primarily from the sale of gold and is therefore exposed to fluctuations in the Australian dollar gold price. Volatility in the gold price creates revenue uncertainty and requires careful management of business performance to ensure that operating cash margins are maintained. A declining gold price can also impact operations by requiring a reassessment of the feasibility of a particular exploration or development project, which would cause delays and potentially have a material adverse effect on results of operations and financial condition. The Consolidated Entity has historically sold its gold production into the spot market. In July 2026, subsequent to the end of the financial year, Catalyst entered into gold forward sale contracts over 30,000 ounces, representing approximately 2% of Reserves, to provide a degree of price protection while retaining the majority of its exposure to the gold price. Ore Reserve Mineral Resource and Ore Reserve are expressions of judgement based on knowledge, experience, and industry practice, and no assurances can be given that the Mineral Resource and Ore Reserve estimates and the underlying assumptions will be realised. Estimates, which were valid when originally calculated, may alter when new information or techniques become available. In addition, by their very nature, Mineral Resource and Ore Reserve estimates are imprecise and depend to some extent on interpretations, which may prove to be inaccurate. As further information becomes available through additional fieldwork and analysis, the Mineral Resource and Ore Reserve estimates may change. Actual mineralisation of ore bodies may differ from those predicted, and any material variation in the estimated Ore Reserves may have a material adverse effect impact on the Group’s results of operations, financial condition, and prospects. Production, operating and capital cost estimates The Group prepares estimates of future production, operating costs and capital expenditure relating to production at its operations. No assurance can be given that such estimates will be achieved. Failure to achieve production or cost estimates or material increases in costs could have an adverse impact on the Group’s future cash flows, profitability, results of operations and financial condition. The Consolidated Entity’s actual production and costs may vary from the estimates due to a variety of reasons including variances in actual ore mined due to varying estimates of grade, tonnage, dilution, metallurgical and other characteristics; revision of mine plans; changing ground conditions; labour availability and costs; energy costs; and general inflationary pressures being felt across the industry. The development of estimates is managed by Catalyst using a rigorous planning, budgeting and forecasting process. Project development and execution The Consolidated Entity’s growth strategy depends on bringing a number of new mines into production over a relatively short period. During FY26 the Trident open pit was completed and the Keillor underground mine was brought into production, development of the Trident underground commenced, and approvals were progressed for Old Highway and Cinnamon. Mine development is subject to risks including delays in obtaining approvals, adverse ground conditions, availability and performance of contractors and equipment, capital cost escalation and slower than planned ramp up. A material delay or cost overrun on any of these developments could adversely affect the Consolidated Entity’s production profile, cash flows and financial condition.
11
Catalyst Metals Limited Directors' report 30 June 2026 Operating risks The Group’s mining operations are subject to all of the hazards and risks normally encountered in the exploration, development, and production of gold that could result in decreased production, increased costs and reduced revenues. The operation may be affected by equipment failure, toxic chemical leakage, labour disruptions and availability, residue and tailings dam failures, rain and seismic events which may result in environmental pollution and consequent liability. The impact of these events could lead to disruptions in production and scheduling, increased costs and loss of facilities, which may have a material adverse impact on the Consolidated Entity’s results. To manage this risk Catalyst seeks to attract and retain high calibre employees and implement suitable systems and processes to ensure production targets are achieved. Employee Workforce Competition for human resources continues to be very high in Australia (and particularly in Western Australia). Strategic retention strategies and incentive schemes, and a focus on organisational culture, employee health and wellbeing continue to be a focus to address human resource risk. The Catalyst business and workforce has grown significantly over the past three years. Diversity and inclusion is a key focus for the management team across the business. The Board has set a target to have 30% female representation at the Board level, in line with ASX Corporate Governance guidelines. Following the appointment of Ms Anna Shave on 8 September 2025, female representation at the Board level was 20% at 30 June 2026. Exploration and development risks An ability to sustain or increase the current level of production in the longer term is in part dependent on the success of Catalyst’s exploration activities. Exploration is a high-risk activity that requires large amounts of expenditure over extended periods of time. Few properties that are explored subsequently have economic deposits of gold identified, and even fewer are ultimately developed into producing mines. Conclusions drawn during exploration and development are subject to the uncertainties associated with all sampling techniques and to the risk of incorrect interpretation of geological, geochemical, geophysical, drilling and other data. In addition, development of tenements from exploration into producing mines require the appropriate level of funding. The Company has significantly strengthened its Balance Sheet over the past 12 months and been successful in the past in securing funding through equity or debt to fund exploration and development programmes but there is no assurance that funding will be secured for all future expansion projects. Climate Change Catalyst recognises that climate change poses a key environmental and social risk to its business, and the markets in which the Group operates in. The highest priority climate related risks include reduced water availability, extreme weather events, changes in legislation and regulation, reputational risk, and technological and market changes. While Catalyst proposes to comply with applicable laws and regulations and conduct its programmes in a responsible manner regarding the environment, there is the risk that Catalyst may incur liability for any breaches of these laws and regulations. Licenses, permits and approvals To operate its mines and undertake its exploration programme, Catalyst needs to comply with applicable environment and planning laws, regulations and permitting requirements. The Consolidated Entity has in place the necessary approvals and licences to operate its mine sites and to undertake its exploration activities. In the ordinary course of business, mining companies are required to seek government permits for exploration, expansion of existing operations or for the commencement of new operations. The duration and success of permitting efforts are contingent upon many variables not all within the controls of the Group. There can be no assurance that all necessary permits will be obtained, and, if obtained, that the costs involved will not exceed those estimated by the Group.
12
Catalyst Metals Limited Directors' report 30 June 2026 Information technology and cyber security risk Catalyst’s operations are supported by information technology systems that can be subject to interference or disruptions resulting in production downtime, operational delays, destruction or corruption of data, disclosure of sensitive information and data breaches. The Company has established disaster recovery plans and cyber security monitoring systems to manage this risk. Community relations Community relations is about people connecting with people. Maintaining trusted relationships with our local community stakeholders throughout the entire mining cycle is an essential part of securing and maintaining our social licences to operate. Catalyst recognises that a failure to appropriately manage local community stakeholder expectations may lead to dissatisfaction which has the potential to disrupt production and exploration activities. Government regulation and taxation The Consolidated Entity’s mining, processing, development and exploration activities are subject to various laws and statutory regulations governing prospecting, development, production, taxes, royalty payments, labour standards and occupational health, mine safety, toxic substances, land use, water use, communications, land claims of local people and other matters. No assurance can be given that new laws, rules and regulations will not be enacted or that existing laws, rules and regulations will not be applied in a manner which could have an adverse effect on the group’s financial position and results of operations. Any such amendments to current laws, regulations and permits governing operations and activities of mining and exploration, or more stringent implementation thereof, could have a material adverse impact on the Consolidated Entity. The gold mining industry is subject to several Government taxes, royalties and charges. Changes to the rates of taxes, royalties and charges can impact the profitability of the Consolidated Entity. Funding and debt covenants The Consolidated Entity has entered into agreements with financiers and customers that contain various undertakings and financial covenants. Non-compliance with the undertakings and covenants contained in these agreements could lead to a default event resulting in the debt becoming due and payable with potentially adverse effects on the financial position of the Group. Management monitors for compliance with the required undertakings and covenants. ENVIRONMENTAL REGULATION The Consolidated Entity is subject to and is compliant with all aspects of environmental regulation of its exploration and mining activities. Throughout the year there were no material environmental impacts. Through ongoing planning and review of management practices Catalyst continues to assess any potential impacts and ensure these risks are managed. Annually a simulation exercise is undertaken in consultation and involvement with regulatory and other constituency interests to ensure the Consolidated Entity and supporting services are appropriately trained and equipped to manage any event. This is part of Catalyst’s continuous improvement programme. SUSTAINABILITY REPORT The Consolidated Entity is required to prepare a sustainability report for the year ended 30 June 2026 under Chapter 2M of the Corporations Act 2001. The Sustainability Report, comprising the climate statements, the notes to the climate statements and the Directors' declaration on those statements, has been prepared in accordance with AASB S2 Climaterelated Disclosures and is included in this Annual Report. This is the Consolidated Entity's first sustainability report. In preparing it, the Consolidated Entity has applied the first-year transition reliefs available, including relief from comparative information and from disclosing Scope 3 greenhouse gas emissions, and has applied the jurisdictional relief in AASB 2025-1 in reporting Scope 1 and Scope 2 greenhouse gas emissions under the National Greenhouse and Energy Reporting Act 2007. The Sustainability Report has been reviewed by PricewaterhouseCoopers; the review report follows the Directors' declaration on that report, and the fees for that review are disclosed in Note 35 to the financial statements.
13
Catalyst Metals Limited Directors' report 30 June 2026 INFORMATION ON DIRECTORS Name:
Mark Connelly (Appointed 2 March 2026)
Title:
Independent Non-Executive Chairman
Experience and expertise:
Mr Connelly is an internationally experienced mining industry professional with more than 30 years’ experience in the natural resources sector and a strong track record of value creation in the gold industry. He was most recently Non-Executive Chairman of Emmerson Resources Ltd which was acquired by Pan African Resources in June 2026 for A$311 million. Mr Connelly was also a Non-Executive Chairman of Warriedar Resources Limited, which was acquired by Capricorn Metals Ltd for approximately A$327 million in November 2025, and was Non-Executive Chairman of Alto Metals Limited, which was acquired by Brightstar Resources Limited for approximately A$80 million in 2024. Earlier in his career, Mr Connelly was Managing Director and Chief Executive Officer of Papillon Resources Limited, where he was instrumental in the US$570 million merger of Papillon with B2Gold Corporation in October 2014. Prior to Papillon, he was Chief Operating Officer of Endeavour Mining Corporation, following its merger with Adamus Resources Limited, where he was Managing Director and Chief Executive Officer. Mr Connelly holds a Bachelor of Business from Edith Cowan University and is a member of the Australian Institute of Company Directors and the Society for Mining, Metallurgy and Exploration.
Other current directorships:
Non-Executive Chairman of Tesoro Gold Limited (ASX: TSO), Non-Executive Chairman of Stellar Resources Limited (ASX: SRZ), Non-Executive Chairman of Astral Resources NL (ASX: AAR), Non-Executive Director of Antares Metals Limited (ASX: AM5), Non-Executive Director of Renegade Exploration Limited (ASX: RNX) and Chairman of BeMetals Corp. (TSX-V: BMET).
Former directorships (last 3 years): Non-Executive Chairman of Emmerson Resources Limited (ASX: ERM) from 21 March 2025 until the implementation of the Pan African Resources scheme of arrangement in June 2026; Non-Executive Chairman of Warriedar Resources Limited (ASX: WA8) until the implementation of the Capricorn Metals scheme of arrangement in November 2025; Director of Omnia Metals Group Limited (ASX: OM1) until 1 May 2025; Non-Executive Chairman of Calidus Resources Limited (ASX: CAI) until 7 January 2025; Non-Executive Chairman of Alto Metals Limited (ASX: AME) until 9 December 2024; and Non-Executive Chairman of Chesser Resources Limited (ASX: CHZ) until 27 September 2023. Special responsibilities:
Chairman of the Board and member of the Nomination and Remuneration Committee
Interests in shares:
Nil
Interests in options:
Nil
Interests in performance rights:
Nil
14
Catalyst Metals Limited Directors' report 30 June 2026 Name:
David Jones AM (Appointed 2 October 2023, Resigned 2 March 2026)
Title:
Independent Non-Executive Chairman
Experience and expertise:
Mr Jones has +30 years’ experience in investment markets, the majority as a general partner in private equity firms, and prior to that in general management and management consulting. Mr Jones has been a board member of numerous private and public businesses, and has been a member of the Investment Committee of EMR Capital, a resources private equity firm, since 2012. Mr Jones was a Managing Director at CHAMP Private Equity, Executive Director and Country Head of UBS Capital and a Division Director at Macquarie Direct Investment. He holds a Mechanical Engineering degree from the University of Melbourne (First Class Honours) and a Master of Business Administration from Harvard Business School. In 2021, Mr Jones was made a Member of the Order of Australia for significant service to the museums and galleries sector, and to the community.
Other current directorships:
Chair of VGI Partners Global Investments Limited (ASX: VG1), and a director of Regal Asian Investments Limited (ASX: RG8).
Former directorships (last 3 years): Non-Executive Director of Regal Partners Limited (ASX: RPL) until 23 May 2023. Special responsibilities:
Chairman (until 2 March 2026)
Interests in shares:
2,066,666
Interests in options:
Nil (2,000,000 options were exercised on 30 September 2025)
Name:
James Champion de Crespigny
Title:
Managing Director & Chief Executive Officer
Experience and expertise:
Mr Champion de Crespigny is a qualified chartered accountant with extensive experience in capital markets, financing and mergers and acquisitions, primarily in the mining sector. His most recent experience was a Director of Cutfield Freeman & Co., a global boutique financial advisor specialising in the mining industry. Prior to this, he was an Associate Director at Mining Private Equity firm, EMR Capital.
Other current directorships:
None
Former directorships (last 3 years): None Special responsibilities:
None
Interests in shares:
2,885,833
Interests in performance rights:
4,478,946
15
Catalyst Metals Limited Directors' report 30 June 2026 Name:
Bruce Kay
Title:
Non-Executive Director
Experience and expertise:
Mr Kay is a qualified geologist and former head of worldwide exploration for Newmont Mining Corporation. He is a highly experienced geologist with a resource industry career spanning more than 30 years in international exploration, mine, geological, project evaluation and corporate operations. Mr Kay retired from Newmont in 2003. Based in Denver, Colorado, USA, he managed worldwide exploration for Newmont. Prior to this appointment Mr Kay was group executive and Managing Director of exploration at Normandy Mining Limited where he was responsible for managing its global exploration programme from 1989 until 2002.
Other current directorships:
None
Former directorships (last 3 years): None Special responsibilities:
Technical Director
Interests in shares:
1,472,169
Interests in performance rights:
600,000
Name:
Robin Scrimgeour
Title:
Independent Non-Executive Director
Experience and expertise:
Mr Scrimgeour spent 17 years working for Credit Suisse in London, Tokyo, Hong Kong and Singapore. His most recent experience has been providing structured hybrid financing for corporates in Asia for project and acquisitions concentrated in the primary resources sector. Mr Scrimgeour’s previous experience includes as a senior equity derivatives trader involved in the pricing of complex structured equity derivative instruments for both private and corporate clients focussed in Asia. Mr Scrimgeour holds a Bachelor of Economics with Honours from the University of Western Australia.
Other current directorships:
None
Former directorships (last 3 years): None Special responsibilities:
Member of the Audit & Risk Committee and the Nomination and Remuneration Committee
Interests in shares:
4,000,000
Name:
Anna Shave (Appointed 8 September 2025)
Title:
Independent Non-Executive Director
Experience and expertise:
Ms Shave is an experienced Non-Executive Director and investment professional with a combined corporate and financial services background spanning over 27 years. Ms Shave’s executive career includes senior leadership roles with Resource Capital Funds, Tanarra Capital, Fortescue Metals Group, J.P. Morgan and Bank of America Merrill Lynch in New York. She is also a Non-Executive Director and Audit & Risk Committee Member of Funds SA, Non-Executive Director and Chair of the Investment Committee of Good Sammy Enterprises, and a Member of the Western Australian Government Innovation Advisory Board, advising on innovation, investment and economic development.
Other current directorships:
None
Former directorships (last 3 years): None Special responsibilities:
Chair of the Nomination and Remuneration Committee and chair of the Audit & Risk Committee
Interests in shares:
Nil
16
Catalyst Metals Limited Directors' report 30 June 2026 'Other current directorships' quoted above are current directorships for listed entities only and excludes directorships of all other types of entities, unless otherwise stated. 'Former directorships (last 3 years)' quoted above are directorships held in the last 3 years for listed entities only and excludes directorships of all other types of entities, unless otherwise stated. COMPANY SECRETARIES Emma Wates Ms Wates is a professional company secretary employed by Automic Group. Ms Wates has over 20 years’ experience in providing company secretarial and corporate compliance services to listed companies. Ms Wates has advised on several successful ASX listings as well as being involved in various secondary and seed capital raisings for public and private companies. Ms Wates is a Chartered Accountant and a senior associate of the Financial Services Institute of Australia. Chelsea Sheridan (Resigned 20 May 2026) Ms Sheridan was a Company Secretary employed by Automic Group, where she managed a portfolio of ASX-listed companies across a diverse range of industries. She has more than 10 years’ experience in corporate governance and holds a Diploma in Business Administration. Ms Sheridan is also a member of the Governance Institute of Australia ('GIA'). MEETINGS OF DIRECTORS The number of meetings of the Company’s Board of Directors ('the Board') and of each Board committee held during the year ended 30 June 2026, and the number of meetings attended by each Director were: Audit & Risk Committee Meetings Attended Held
Board Meetings Attended Held Director Mark Connelly (from 2 March 2026)* David Jones (to 2 March 2026) James Champion de Crespigny Bruce Kay Robin Scrimgeour Anna Shave (from 8 September 2025)**
Nomination & Remuneration Meetings Attended Held
3
3
1
1
6 9 9 9 7
6 9 9 9 7
2 3 2
2 3 2
1 1
1 1
- Mr Connelly also attended 2 Board Meetings and 1 Audit & Risk Committee Meeting as a guest ** Ms Shave also attended 1 Audit & Risk Committee Meeting and 1 Nomination and Remuneration Committee Meeting as a guest
Held: Represents the number of meetings held during the time the Director held office or was a member of the relevant committee. In addition to the above meeting attendances, 13 Board and 3 Nomination and Remuneration Committee circular resolutions were approved during the year.
17
Catalyst Metals Limited Directors' report 30 June 2026 Letter from the Chair of the Nomination and Remuneration Committee (‘NRC’) Dear Fellow Shareholder, On behalf of the Catalyst Board, I am pleased to present our Remuneration Report for the FY26 financial year. The remuneration framework was carefully designed in 2024 in collaboration with remuneration consultants, Ernst & Young. The intent was to establish a framework which appropriately incentivises and aligns management’s interests with those of shareholders. It has been a pleasing year for Catalyst and shareholders. A record year of production from Plutonic Gold Operations (‘Plutonic’) with a continued focus on safety. The business generated A$277.6 million of net cash from operating activities and reinvested A$196.0 million into infrastructure, Reserve growth and mine developments. The business continued to strengthen its balance sheet, with cash and bullion increasing by A$101 million2 during the year. Catalyst recorded record profits during FY26. Earnings before Interest, Tax, Depreciation and Amortisation (‘EBITDA‘) was A$302.7 million and Net Profit after Tax (‘NPAT’) A$171.1 million, a +380% and +620% increase respectively since Catalyst’s first year of ownership of the Plutonic belt. The operational turnaround at Plutonic in 2023 and 2024, set the business up to take advantage of the rapid rise in gold prices during late 2025 and early 2026. This growth has resulted in significant value being generated for shareholders, including 64% earnings per share growth (from continuing operations). The Company’s strategy is to define ±2Moz of Reserves across the Plutonic Gold Belt to underwrite an increased production rate from ±100koz to ±200koz for ten years. The Board believes that the greatest opportunity to create shareholder value in the near term is through the safe and prudent execution of this strategy. The objective is to develop a lower-risk, stable operating platform with the ore sources and infrastructure to reliably deliver consistent production. The ongoing capital requirements of the belt are expected to fall in the coming years and stabilise as the business moves from a growth phase to a sustaining phase i.e. replacing Reserve depletion, maintaining infrastructure and developing within existing mines. The execution of this strategy is well progressed and the progress during FY26 is a credit to our team. Progress during the year included: • • •
Developing satellite mines – by June 2026, production was being sourced from four mines, up from two in June 2025. Development commenced at Trident underground and Old Highway and Cinnamon commenced their approvals; Building inventory and Reserves – Reserves were increased to 1.5Moz which is a tripling of Reserves since acquisition. Continued exploration drilling discovered the new high-grade underground zone at Cinnamon; and Investment in supporting infrastructure – this has included upgrading camps, the power plant and processing plant to support the long-term increased production rate.
Catalyst ended the FY26 year debt-free, with total liquidity of A$431m comprising A$331m of cash and bullion2 and the undrawn A$100m facility. Subsequent to year-end this facility was expanded to A$200 million to provide Catalyst with treasury of A$531m. The Nomination and Remuneration Committee considers FY26 to have been a successful year for Catalyst and all shareholders. To date, management has delivered significant value for shareholders and we are confident that the ±200koz pa platform being developed will continue to deliver value to shareholders in the future. On behalf of the Board, I invite you to read through our Remuneration Report for FY26. Yours sincerely
Anna Shave Nomination and Remuneration Committee Chair 2 Includes 3,710 ounces of gold bullion on hand valued at A$5,867 per ounce as at 30 June 2026 18
Catalyst Metals Limited Directors' report 30 June 2026 REMUNERATION REPORT (audited) This Remuneration Report for the year ended 30 June 2026 outlines the remuneration arrangements of the Company and the Group in accordance with the requirements of the Corporations Act 2001 (the Act) and its regulations. This information has been audited as required by section 308(3C) of the Act. The Remuneration Report details the remuneration arrangements for Key Management Personnel (‘KMP’). It also outlines the overall remuneration strategy, framework and practices adopted by the Group. For the purposes of this report, KMP are defined as those persons having authority and responsibility for planning, directing and controlling the activities of the Company and the Group, directly or indirectly, including any Director of the Company (whether Executive or otherwise). The Remuneration Report is set out under the following main headings: (1) Key Management Personnel (2) Remuneration governance (3) Remuneration framework (4) Company performance (5) KMP remuneration (6) Service agreements (7) Summary of remuneration at risk (8) Short-Term Incentive Plan (9) Long-Term Incentive Plan (10) Non-Executive Directors’ remuneration (11) Details of remuneration (12) Other additional information (13) Additional disclosures relating to Key Management Personnel
- Key Management Personnel The KMP of the Company and the positions held are summarised below: Non-Executive Directors David Jones AM Mark Connelly Bruce Kay Robin Scrimgeour Anna Shave
Position Independent Non-Executive Chairman Independent Non-Executive Chairman Non-Executive Director Independent Non-Executive Director Independent Non-Executive Director
Term Until 2 March 2026 Appointed 2 March 2026 Full Year Full Year Appointed 8 September 2025
Executive Director James Champion de Crespigny
Managing Director & Chief Executive Officer
Full Year
Other KMP Donna Thornton Elena O’Connor
Chief Financial Officer Chief Financial Officer
Sylvain Guillaume
Acting Chief Financial Officer
Until 24 July 2025 Appointed 24 July 2025 and remained KMP until 2 December 2025 Since 2 December 2025
19
Catalyst Metals Limited Directors' report 30 June 2026 2. Remuneration governance A Nomination and Remuneration Committee (‘NRC’) was established in March 2024 following the rapid growth of the Company. Membership of the NRC currently comprises three Independent Non-Executive Directors, Ms Anna Shave, Mr Mark Connelly and Mr Robin Scrimgeour. The composition of the NRC will continue to be reviewed as the size and structure of the Board evolves with the growth of the Company. One meeting of the NRC was held during the financial year. The NRC operates in accordance with a formal written charter. The NRC advises the Board on remuneration and incentive policies and practices generally and makes specific recommendations in relation to compensation arrangements for Executive and Non-Executive Directors and in respect of all equity-based remuneration plans. The NRC also sets the budget for any annual salary increases for the Group. Remuneration consultants The NRC considers whether to appoint an independent remuneration consultant and, if so, their scope of work. Such engagements are completed in accordance with: ● ●
The requirements of the Corporations Act 2001 for remuneration consultants and recommendations; and Established governance procedures including direct reporting to the Board to ensure that any remuneration recommendations are free from undue influence.
During the financial year ended 30 June 2024, the Group engaged remuneration consultants Ernst & Young to review its existing remuneration policies and provide recommendations on how to improve both the Short-Term Incentive (‘STI’) and Long-Term Incentive (‘LTI’) programmes. Catalyst has continued to apply the remuneration recommendations made for the 30 June 2025 and 30 June 2026 financial years. Ernst & Young was engaged in FY24 to design the STI and LTI plans. No remuneration consultant was engaged during the years ended 30 June 2025 or 30 June 2026, and accordingly no ‘remuneration recommendation’ (as defined in the Corporations Act 2001) was provided to the Company during FY26. 3. Remuneration framework The objective of Catalyst's remuneration framework is to ensure remuneration for performance is competitive and appropriate for the results delivered. The framework aligns remuneration with the achievement of strategic objectives and the creation of value for shareholders, and it is considered to conform to best market practice. The Board ensures that remuneration satisfies the following key criteria for good remuneration governance practices: ● ● ● ●
Competitiveness and reasonableness; Acceptability to shareholders; Performance linkage / alignment of compensation; and Transparency.
The reward framework is designed to align each individual’s remuneration outcomes with the Company’s strategic business objectives and thus shareholders' interests. The Board have considered that it should seek to enhance shareholders' interests by: ● ● ● ●
Having economic profit as a core component of plan design; Focusing on sustained growth in shareholder wealth, consisting of dividends and growth in share price, and delivering constant or increasing return on assets as well as focusing the executive on key non-financial drivers of value; Attracting, motivating and retaining high calibre KMP; and Incorporating service period vesting conditions to encourage retention of executives.
Additionally, the reward framework should seek to enhance employees' interests by: ● ● ●
Rewarding capability and experience; Reflecting competitive reward for contribution to growth in shareholder wealth; and Providing a clear structure for earning rewards.
20
Catalyst Metals Limited Directors' report 30 June 2026 4. Company Performance Catalyst aims to align executive remuneration to strategic and business objectives and the creation of shareholder wealth. The table below shows measures of the Group’s financial performance over the last five years as required by the Corporations Act 2001. The below financial performance measures have improved materially. The reason for the 553% increase in the share price over the last three financial years is due to the Company acquiring two companies which held a collection of neighbouring Western Australian mineral rights in mid-2023. This consolidation led to the pairing of infrastructure and gold Resources that had not been paired together for many years. Soon after the consolidation, the Company was able to effect an operational turnaround with the Plutonic operations going from loss making to profit making. As a result, the Company evolved the Plutonic Belt from being a short life, loss making asset to one that is a long-term viable going concern. As sustainability of the operations at Plutonic was achieved, Catalyst initiated an investment programme on the Plutonic Belt with a view to grow the Resources and Reserves as well as bring online new sources of ore. Gold is now mined from four sources (Plutonic Main, Plutonic East, Keillor (formerly K2) and Trident (open pit)), and the Company is well underway in delivering its organic growth strategy to increase annual gold production to ±200koz. The earnings of the Group for the five years to 30 June 2026 are summarised below: 2022 $'000 63,330 7,376 2,033 2,091 57,720
Sales revenue EBITDA EBIT Profit/(loss) after income tax Dividends paid Net assets
2023 $'000 63,944 (813) (15,236) (15,628) 171,786
2024 $'000 317,014 62,735 30,694 23,558 201,980
2025 $'000 453,089 193,092 154,139 119,272 470,731
2026 $'000 631,938 302,734 239,129 171,120 700,075
(1) The 2025 comparatives above include the sales revenue, EBITDA, EBIT and profit after income tax of the discontinued operation (the Henty Gold Mine, disposed in May 2025).
Share price at financial year-end ($) Share price increase year-on-year (%)
2022 1.2 (38.5)
2023 0.77 (35.8)
2024 1.13 46.8
2025 5.22 362.0
2026 5.03 (3.6)
Earnings per share (cents per share) Diluted earnings per share (cents per share)
2.13 2.12
(12.66) (12.66)
10.69 10.48
52.27 50.12
66.25 64.37
Undiluted market capitalisation at year-end ($m)
119
169
254
1,314
1,313
EBITDA (A$m)
Net profit after tax (A$m) $171m
$303m $119m
$193m $63m
$6m
$1m
$7m
($16m)
($1m)
FY2021
FY2022
FY2023
$24m
$2m
FY2024
FY2025
FY2026
FY2021 FY2022 FY2023 FY2024 FY2025 FY2026
21
Catalyst Metals Limited Directors' report 30 June 2026
Earnings per share (cents per share)
Catalyst Share Price (A$)
66
1
Share price A$
52 11
2 (13)
FY2021 FY2022 FY2023 FY2024 FY2025 FY2026
12 10 8 6 4 2 0 FY2021FY2022FY2023FY2024FY2025FY2026
- KMP remuneration The Company aims to reward executives based on their position and responsibility, with a level and mix of remuneration which has both fixed and variable components. Total Remuneration (‘TR’) for all executive KMP consists of the following key elements:
22
Catalyst Metals Limited Directors' report 30 June 2026 Element Total Fixed Remuneration (‘TFR’)
Objective The remuneration objective is to attract, engage and retain high calibre executives.
Description The purpose of the TFR is to provide a base level of remuneration reflecting the level of expertise and experience which is market competitive and appropriate.
Benchmarking data, internal relativities and TFR includes a base pay component and superannuation. Executives may receive executive performance are taken into their TFR in the form of cash or other fringe benefits where it does not create any consideration when setting TFR. additional costs to the Group and provides additional value to the executive. STI
The STI is an ‘at-risk’ component of TR. The The key performance indicators (‘KPI’) are set at the start of each financial year with STI maximum opportunity as a percentage a one-year performance period. of fixed remuneration is 100% for the Managing Director and 60% for executive KPI's are set for the performance of the Company (33%), business units/team (33%) KMPs. The performance measures set have and at an individual level (34%). a one-year horizon. The Company KPIs (33%) are measured by the Group’s ability, in the short term, to: The objective of the STI is to link achievement of the Group’s operational KPI Measure Weighting targets with the remuneration received by Grow Reserves Internal targets based on 33% executives charged with meeting those achieving long term Reserve targets. growth aims Deliver relative Share price performance having 34% The STI programme is designed to retain shareholder consideration for short term and reward exceptional performance, returns challenges dedication and contributions to the Group. Build gold Gold production in line or 33% production greater than budget The key focus of the performance measures set is to build and deliver superior shareholder returns. As these metrics are representative of the longer term performance of the Company, going forward, these will only form part of the LTI KPIs. The business unit / team KPI’s include the targets for the following: (33%)
Individual KPI’s are determined annually between the Company and individual executives with reference to the Company’s strategic objectives. The three components are applied as a percentage of the employee’s TFR, based on the role and level of the employee. The NRC has discretion to adjust these weightings. In FY25, 25% of the STI was granted in the form of performance rights. Performance rights were awarded when performance hurdles were achieved and vested upon longer-term service conditions being met (employees were required to remain employed for an additional two years after the end of the performance period). In FY26, 100% of the achieved STI is paid in cash. This change in the structure was to more closely align the remuneration framework with Catalyst’s peers. The Board has discretion to approve ad-hoc incentives to certain employees. Examples may include where the intellectual property they hold is both important and unquantifiable to their value to the business or execution of transformative business transactions.
23
Catalyst Metals Limited Directors' report 30 June 2026 Element LTI
Objective Description The LTI is an ‘at-risk’ component of TR. The The LTI is granted annually in the form of Performance Rights. LTI opportunity as a percentage of fixed KPI conditions are set at the start of each year with a three-year performance period. remuneration is 100% for the Managing Rights granted are calculated as a percentage of TFR divided by the 90-day VWAP Director and 60% for the other KMPs. The prior to the start of the performance period. performance measures set have a three year horizon. KPI’s are set based on the key measures for driving long-term shareholder wealth. These include: The objective of the LTI is to motivate, reward and retain executives in a manner - Relative Total Shareholder Returns to a comparator peer group1 (34%); which aligns this element of their
- Reserve Growth (33%); and remuneration with the creation of
- Gold Production Growth (33%). shareholder wealth through long-term performance and growth of the Company. The near-term strategic objective of Catalyst is to define sufficient Ore Reserves to underpin a long term, increased production rate at the Plutonic Gold Belt. This The LTI programme is designed to motivate increase in production rate will be achieved by developing new mines to be key talent by emphasising the connection processed at the central processing plant. The Board considers that achieving this between individual performance, objective will be the primary driver of value for Catalyst’s shareholders at this time. organisational success, and long-term Failing to invest in the long-term future of the Company’s mines will only serve to shareholder value. maximise short term profits and not long-term gains. Gold Production Growth and Reserve Growth are considered appropriate KPIs against which to reward It enables executives to participate in the executives. growth and development of the Company. The three components are equally weighted and are applied as a percentage of the employee’s TFR, based on the role and level of the employee.
- Relative Total Shareholder Return Calculated by comparing the Company TSR over the three year performance period commencing 1 July 2025 against comparator peer group1
- Reserve Growth Reserve growth will be tested over the performance period against the latest publicly stated Reserve announcement
- Gold Production Growth Gold production growth will be tested by the Company’s annual gold production over the performance period.
(1) Comparator peer group includes: Bellevue Gold Ltd, Black Cat Syndicate Ltd, AIC Mines Limited, St Barbara Limited, Pantoro Limited, Ora Banda Limited, Alkane Resources Limited, Westgold Resources Limited, Vault Minerals Limited, Regis Resources Limited, Genesis Minerals Limited, Capricorn Metals Limited, Ramelius Resources Limited, Gold Road Resources Limited. Where a peer is no longer publicly trading, the outcome for that entity is crystallised on the last day of trading.
- Service agreements Remuneration and other terms of employment for executive KMP are formalised in service agreements. Details of these agreements are as follows: Title J Champion de Managing Director Crespigny1 and Chief Executive Officer D Thornton1 Chief Financial Officer
Agreement Commenced
Period as a KMP
12 October 2022
Whole year
$750,000
Until 24 July 2025 From 24 July 2025 to 2 December 2025 From 2 December 2025
$350,000
4 months
3 months
$480,000
6 months
6 months
$300,000
1 month
1 month
E O’Connor1
Chief Financial Officer
27 February 2023 24 July 2025
S Guillaume2
Acting Chief Financial Officer
13 December 20232
Total Fixed remuneration
Notice Notice Period Period by by Executive Company 6 months 6 months
(1) If terminated for cause or the Executive resigns, any unvested rights and options will automatically lapse on the date of cessation of employment (2) There has been no modification to Mr Guillaume’s employment agreement when he started his role as Acting Chief Financial Officer on the departure of Ms O’Connor. He was previously employed as the Company’s Manager - Finance Projects
KMP have no entitlement to termination payments in the event of removal for misconduct. 24
Catalyst Metals Limited Directors' report 30 June 2026 7. Summary of remuneration at-risk Fixed remuneration
At risk - STI
At risk - LTI
At risk – Production Incentives
2026
2025
2026
2025
2026
2025
2026
2025
18%
20%
14%
29%
58%
37%
10%
14%
Executive Directors: J Champion de Crespigny
Other Key Management Personnel: D Thornton E O’Connor
1%
41%
39%
99%
20%
100%
S Guillaume
18%
71%
11%
- Short-Term Incentive Plan FY26 Short-Term Incentives: The award of the STI payment is assessed at the end of the financial year and, if applicable, is only paid after the NRC has reviewed and made recommendations to the Board for approval. This includes the assessment of achievements against applicable KPI’s and individual performances. The Board has determined and approved the award for the FY26 STI for both the Managing Director & Chief Executive Officer and the Acting Chief Financial Officer as 90% achievement of the Company, 71% for the Business Units / Teams, and 100% for the individual objectives (which are equally weighted per section 5), resulting in a 87% payout. The proportion of the cash bonus paid/payable or forfeited is as follows: Performance achievement (% of Maximum STI maximum opportunity achieved) Executive Directors: J Champion de Crespigny Other Key Management Personnel: D Thornton E O’Connor S Guillaume1,2 (1)
Incentive Outcomes % payable
% forfeited
Total STI Payment (Cash)
87%
$750,000
87%
13%
$652,500
87%
$180,000
87%
13%
$156,600 $809,100
Mr Guillaume was not a KMP for the entire financial year FY26. The STI payment included in Mr Guillaume’s disclosed remuneration for FY26 relates only to the period where he was a KMP.
(2)
In addition, Mr Guillaume received a $75,000 adhoc cash incentive (including superannuation), awarded outside the STI plan to recognise him stepping into the role of Acting Chief Financial Officer.
The above FY26 STI awards have been accrued in FY26 and payable in FY27.
25
Catalyst Metals Limited Directors' report 30 June 2026 FY26 STI performance scorecard The following scorecard sets out the FY26 STI performance measures, their weightings, the targets set at the start of the year and the outcomes assessed by the NRC. The STI is assessed across three equally-weighted components — Company (Group) performance, Business Units/Team performance and Individual performance (each one-third of the maximum opportunity), consistent with Section 5. The percentages below are expressed as a percentage of the maximum STI opportunity (100% of TFR for the Managing Director & CEO and 60% of TFR for other executive KMP). STI component Company (Group) performance Business Units/Team performance Individual performance Blended STI outcome
Weighting One-third One-third One-third 100%
Outcome (% of maximum) 90% 71% 100% 87%
Company (Group) performance (one-third). The Company component was assessed as follows: Company measure Reserve growth
Relative Total Shareholder Return Gold production
Assessment basis The Company delivered on its FY26 drilling programme, with the annual Reserve update due late September 2026. The NRC has determined that the Reserve Growth measure is better aligned to the LTI and will only form part of the LTI targets from FY2027 onwards. Similar to the Reserve growth measure, the NRC has determined that the Relative Total Shareholder Return is better aligned to the LTI and will only form part of the LTI targets from FY2027 onwards. Gold production of 103,761oz, being approximately 104% of budget, sourced from four mines (Plutonic Main, Plutonic East, Trident and Keillor).
Outcome Achieved
Partially Achieved
Achieved
Overall Company performance
90%
Team performance (one-third). The Team component is measured against the following scorecard: Measure Safety and training Environmental & compliance Gold production All-In Sustaining Costs (AISC) / total operating costs Total
Weighting 20% 20% 30% 30%
Compliance across internal training and safety targets No serious regulatory noncompliance 95% of budget (95,000oz)
Full payment (100% of award) Improvement across internal training and safety targets Compliance with all licence conditions 105% of budget (105,000oz)
A$100/oz above budget (A$2,750/oz)
A$100/oz below budget (A$2,550/oz)
Threshold (50% of award)
100%
Result
Outcome
0%
0%
100%
20%
100%
30%
69%
21% 71%
In assessing the Team scorecard, the NRC noted:
Safety and training (20% Weighting) – recordable injuries increased during a period of rapid workforce growth, with TRIFR rising from 6.3 at 30 June 2025 to 10.4 at 30 June 2026. The measure was not met and no award was made, giving a 0% outcome;
Environmental & Compliance (20% weighting) - there were no serious regulatory non-compliances and all licence conditions were met, giving a 100% result and a 20% outcome;
Gold production (30% weighting) - 103,761oz was produced from four mines, above the 95,000oz threshold but marginally short of the 105,000oz required for full payment, which on a straight-line basis gives a result of 94%. The NRC exercised its discretion to award a 100% result, and a 30% outcome, on the basis that the shortfall did not arise from underlying operating performance; and
AISC (30% weighting) - reported AISC of A$2,747/oz was inflated by royalties, which move with the gold price and are outside management's control. The NRC considered it appropriate to exclude that impact, and the adjusted AISC used to determine the STI outcome was A$2,675/oz, giving a 69% result and a 21% outcome.
26
Catalyst Metals Limited Directors' report 30 June 2026 Individual performance (one-third). Individual objectives are set annually between the Company and each executive by reference to the Company’s strategic objectives, covering safety leadership, delivery of strategic projects, financial and capital management, and organisational capability. FY24 Short-Term Incentive Performance Rights: The STI Performance Rights issued as part of the FY24 STI Plan were subject to service conditions until 30 June 2026. As a result, the following Performance Rights vested at 30 June 2026 and were exercisable. FY24 STI Performance Rights Executive Directors: J Champion de Crespigny Other Key Management Personnel: D Thornton(1) E O’Connor S Guillaume(2) (1)
Number of Rights granted
Number of rights vested at 30 June 2026
106,838
106,838
80,128
80,128 186,966
The Board of Directors exercised its discretion in respect of the FY24 Performance Rights granted to Ms Thornton. Ms Thornton resigned from her position as Chief Financial Officer in July 2025 but remained at the disposal of the Company throughout FY26. Recognising her role in the consolidation of the Plutonic Belt, Ms Thornton was considered a good leaver and her FY24 STI Performance Rights were not forfeited, with 80,128 shares issued, subsequent to 30 June 2026.
(2)
A discretionary bonus of $201,924 (equivalent to the value of 33,654 Catalyst Metals Shares valued at $6 per share) is payable to Mr Guillaume as if he had been invited to participate in the FY24 STI Plan. Only a limited group of management were invited to join the FY24 STI plan. Mr Guillaume joined the Company in August 2023 and was a senior finance manager at the time the invitations for the FY24 LTI and STI plans were issued. The NRC considered Mr Guillaume’s role and contribution to the business over the past three years and considered it was appropriate to issue a cash payment equivalent to the value of the number of shares he would have been issued on conversion of the FY24 Performance Rights he would have been granted, had he been invited to participate in the LTI and STI plans.
- Long-Term Incentive Plan FY26 Long-Term Incentive Performance Rights: The award of the LTI payment is assessed at the end of the performance period and, if applicable, is only awarded after the NRC has reviewed and made recommendations to the Board for approval. This includes assessment of achievement against the applicable performance measure. KPI’s for the FY26 LTIs are set based on the key measures for driving long-term shareholder wealth. These include internal targets, threshold targets and stretch hurdles for Relative Total Shareholder Returns to a comparator peer group3 (34%); Reserve Growth (33%); and Group Gold Production Growth (33%). The near-term strategic objective of Catalyst is to define sufficient Ore Reserves to underpin a long term, increased production rate at the Plutonic Gold Belt. The Board considers that achieving this objective will be the primary driver of value for Catalyst’s shareholders at this time. Failing to invest in the long-term future of the mine will only serve to maximise short term profits and not long-term gains. Gold Production Growth and Reserve Growth are considered appropriate financial KPIs against which to reward executives. Once the performance period has concluded, the NRC will have the necessary information to assess KMP performance. Once performance against KPIs is assessed, the NRC will be able to calculate the amount of performance rights to be granted. This will occur on 30 June 2028.
3
Refer to Section 5. KMP remuneration table for comparator peer group 27
Catalyst Metals Limited Directors' report 30 June 2026 The table below sets out the Performance Rights (Class FY26) that were granted to the Managing Director & Chief Executive Officer and the Acting Chief Financial Officer under the Catalyst Metals Employee Incentive Plan during FY26. The performance rights are yet to vest and will be tested at the end of the three-year measurement period which ends on 30 June 2028. FY26 LTI Performance Rights granted 121,147 29,075
Name J Champion de Crespigny D Thornton E O’Connor S Guillaume
FY26 LTI Performance Rights Lapsed
Unvested FY26 LTI Performance Rights 121,147 29,075
FY24 Long-Term Incentive Performance Rights: Performance Rights were issued in FY24 and the outcome was as follows: FY24 LTI Performance Rights
Incentive Outcomes Maximum LTI opportunity (# % achieved of (individual) Performance Rights)
Executive Directors: J Champion de Crespigny Other Key Management Personnel: D Thornton(1) E O’Connor S Guillaume(2)
% achieved (Team)
% achieved (Group)
Total LTI rights exercisable
427,350
100%
100%
100%
427,350
320,513
100%
100%
100%
320,513 747,863
(1) The board of Directors exercised its discretion in respect of the FY24 Performance Rights granted to Ms Thornton. Ms Thornton resigned from her position as Chief Financial Officer in July 2025 but remained at the disposal of the Company throughout FY26. Recognising her role in the consolidation of the Plutonic Belt, Ms Thornton was considered a good leaver and her FY24 LTI Performance Rights were not forfeited, with 320,513 shares issued, subsequent to 30 June 2026. (2) A discretionary bonus of $807,690 (equivalent to the value 134,615 Catalyst Metals Shares valued at $6 per share) is payable to Mr Guillaume as if he had been invited to the FY24 LTI Plan. Only a limited group of management were invited to join the FY24 LTI plan. Mr Guillaume joined the Company in August 2023 and was a senior finance manager at the time the invitations for the FY24 LTI and STI plans were issued. The NRC considered Mr Guillaume’s role and contribution to the business over the past three years and considered it was appropriate to issue a cash payment equivalent to the value of the number of shares he would have been issued on conversion of the FY24 Performance Rights he would have been granted, had he been invited to participate in the LTI and STI plans.
The FY24 LTI performance rights were subject to a three-year performance period from 1 July 2023 to 30 June 2026, measured against three hurdles — Reserve Growth (33%), Relative Total Shareholder Return (34%) and Gold Production Growth (33%). Each hurdle had a threshold, target and stretch, with straight-line vesting between target and stretch and nil vesting below threshold. The vesting scales and outcomes were as follows: Reserve Growth (33%) Reserve Growth over the performance period Less than 750koz (threshold) 750koz (target) 1Moz or more (stretch)
% of rights subject to Reserve Growth that vest Nil 50% 100%
Results Reserves tripled over the period, increasing from 500koz to 1.5Moz over the period, exceeding the 1Moz stretch. 100% vesting.
28
Catalyst Metals Limited Directors' report 30 June 2026 Relative Total Shareholder Return (34%) Relative TSR over the performance period Below median (threshold) Median (target)
% of rights subject to RTSR that vest Nil 50%
75th percentile or above (stretch)
100%
Results Relative TSR was assessed against a peer group of 17 companies. The comparator group comprised 17 companies at the commencement of the performance period on 1 July 2023. Consistent with the plan methodology, peers that merged (for example, Spartan Resources Limited) or were subsequently wound up during the period, had their TSR crystallised as at the date they ceased trading and were retained in the assessment. The comparator group as currently constituted comprises the 14 companies listed in Section 5. Result: Catalyst delivered a TSR of 553% against a peer-group average of 266%, ranking in the 87.5th percentile, exceeding the 75th-percentile stretch. 100% vesting.
Gold Production Growth (33%) Gold Production Growth over the performance period Less than 100,000oz average production (threshold) 100,000oz average production (target) 130,000oz average production, or a 130koz rolling annual rate in the closing six months (stretch)
% of rights subject to Gold Production Growth that vest Nil 50% 100%
Results The Henty Gold Mine contribution (30koz) was removed from the stretch target following its divestment, so the target now reflects Plutonic production. Result: Rolling annual gold production in the closing six months was an annualised 102koz. This exceeded the 100koz stretch target for Plutonic (i.e. 130koz less 30koz Henty contribution). 100% vesting.
On this basis, all three hurdles vested at 100% and the FY24 LTI vested in full. 10. Non-Executive Directors’ remuneration Fees and payments to Non-Executive Directors reflect the demands and responsibilities of their role. Non-Executive Directors' fees and payments are reviewed by the NRC annually. The Chairman's fees are determined independently to the fees of other Non-Executive Directors based on comparative roles in the external market. The Chairman is not present at any discussions relating to the determination of his own remuneration. Non-Executive Directors may be entitled to participate in equity-based remuneration schemes. Shareholders must approve the framework for any equity-based compensation schemes and if a recommendation is made for a Director to participate in an equity scheme, that participation must be specifically approved by the shareholders. ASX listing rules require the aggregate Non-Executive Directors' remuneration be determined periodically by a general meeting. The most recent determination was at the Annual General Meeting (‘AGM’) held on 13 November 2025, where shareholders approved an increase to the maximum annual aggregate remuneration that may be paid to the Company’s Non-Executive Directors by $350,000 to $900,000. The increased aggregate remuneration allows for the Board size to be increased, and to align Board fees with industry peers, while taking into consideration the increase in the workload and governance requirements over the past year. The fees payable to the Non-Executive Directors are as follows:
Board chair fee of $200,000 per annum, noting the Board Chair does not receive committee fees Non-Executive Director fee of $125,000 per annum ARC/NRC Chair fee of $15,000 per annum ARC/NRC Member fee of $7,500 per annum
The Board approves any consultancy arrangements for Non-Executive Directors who provide services outside of and in addition to their duties as Non-Executive Directors. In accordance with best practice corporate governance, the structure of Non-Executive Director and Executive Director remuneration is separate.
29
Catalyst Metals Limited Directors' report 30 June 2026 11. Details of remuneration Amounts of remuneration Details of the remuneration of the KMP of the Group are set out in the following tables. The KMP of the Group consisted of the following Directors of Catalyst Metals Limited: ● ● ● ● ● ●
D Jones (resigned 2 March 2026) M Connelly (appointed 2 March 2026) J Champion de Crespigny B Kay R Scrimgeour A Shave (appointed 8 September 2025)
And the following management: ● ● ●
D Thornton (Chief Financial Officer) (KMP until 24 July 2025) E O’Connor (Chief Financial Officer) (KMP from 24 July 2025 to 2 December 2025) S Guillaume (Acting Chief Financial Officer) (since 2 December 2025)
30
Catalyst Metals Limited Directors' report 30 June 2026 Statutory (AASB 2) Short-term benefits Cash salary and fees $
2026
Non-Executive Directors: D Jones B Kay (1) R Scrimgeour M Connelly A Shave
FY26 cash STI accrued Post-employment benefits Superannuation $
$
Statutory share-based payments
Total Statutory
Equity-settled $
Remuneration $
29,095
138,691 366,895 142,450 61,905 122,121
25,842
3,162,448
4,635,605
987,761 123,721
993,281 287,622 1,059,532
4,303,025
7,808,102
Other longTermination term benefits benefits (5)
$
$
136,012 310,704 142,450 55,272 109,037
2,679 27,096 6,633 13,084
J Champion de Crespigny (MD & CEO)
764,815
652,500
30,000
Other KMP: D Thornton (CFO) (2) E O’Connor (CFO)(4) S Guillaume (Acting CFO) (3)
41,815 177,040 171,351
747,256
10,625 10,582 15,000
2,204
(46,920) 100,000
1,908,496
1,399,756
115,699
28,046
53,080
Executive Directors:
The share-based payment expense disclosed in this report has been determined in accordance with AASB 2 and is based on the grant date fair value of performance rights. The award was set based on a number of performance rights using the 90-day VWAP before the performance period began. As the grant date occurs after the commencement of the performance period, the accounting expense recognised may differ from the value originally implied using a 90-day VWAP to determine the award. The expense recognised under AASB 2 is not always measure of the actual cash benefit that will be received by the KMP on conversion of the performance right, if vesting conditions are met. (1)
In the year ended 30 June 2026, Mr Kay received $111,607 (2025: $74,000) in Directors' fees and was paid an additional $199,096 (2025: $200,301) in fees for leading the Company's exploration programmes.
(2)
The $262,500 disclosed as Ms Thornton’s FY25 bonus represented her FY25 short-term incentive, which was fully accrued in FY25. Only $215,580 were paid as part of the termination payment (inclusive of superannuation). The termination benefits disclosed above for FY26 represents the payout of the annual leave balance, and the difference between the $262,500 accrued for in FY25 and the amount included in the final pay of $215,580.
(3)
Mr Guillaume was granted a cash bonus related to FY24 in lieu of the FY24 STI and LTI Performance Rights. The cash bonus was determined based on 168,269 shares, valued at $6/share. This cash bonus is yet to be paid.
(4)
Ms O’Connor ceased employment on 2 December 2025. Her FY26 remuneration includes an ex-gratia payment of $100,000 made in connection with the cessation of her employment.
(5)
This represents the accrual for long-service leave. Noting that the service conditions for this to be payable to any KMP have not yet been met.
31
Catalyst Metals Limited Directors' report 30 June 2026 Statutory (AASB 2)
2025
Short-term benefits
FY25 cash STI accrued
Cash salary and fees $
$
Non-Executive Directors: D Jones B Kay1 R Scrimgeour
Post-employment benefits Other long-term benefits2
Statutory sharebased payments
Total Statutory
Superannuation $
Equity-settled $
Remuneration $
$
89,686 274,301 81,400
10,314 28,421
19,597
100,000 322,319 81,400
J Champion de Crespigny (MD & CEO)
516,496
412,500
29,932
15,910
1,783,661
2,758,499
Other KMP: D Thornton (CFO)
318,877
262,500
29,932
234,226
845,535
1,280,760
675,000
98,599
15,910
2,037,484
4,107,753
Executive Directors:
(1)
In the year ended 30 June 2025, Mr Kay received $74,000 (2024: $74,000) in Directors' fees and was paid an additional $200,301 (2024: $260,405) in fees for managing the Company's exploration programmes.
(2)
Other long-term benefits represent the provision recorded during the year for long-service leave
- Other additional information Voting and feedback made at the Company's 13 November 2025 AGM At the FY25 AGM, 83.0% of the votes received supported the adoption of the remuneration report for the year ended 30 June 2025. The Company did not receive any specific feedback at the AGM regarding its remuneration practices. Ahead of the FY25 AGM, Catalyst engaged with proxy advisors. The change to the FY26 STI structure, whereby the equity deferred component has been removed, was implemented following feedback from these discussions.
- Additional disclosures relating to key management personnel Shareholding The number of shares in the Company held during the financial year by each Director and other KMP of the Group, including their personally related parties, is set out below:
Ordinary shares R Scrimgeour B Kay J Champion de Crespigny D Jones M Connelly A Shave D Thornton E O’Connor S Guillaume
Balance at start of the year 5,250,000 2,672,169 3,885,833 66,666 1,500 11,876,168
Purchases
Exercised performance rights & options
Disposals
Balance at end of the year
2,000,000 2,000,000
(1,250,000) (1,200,000) (1,000,000) (3,450,000)
4,000,000 1,472,169 2,885,833 2,066,666 1,500 10,426,168
32
Catalyst Metals Limited Directors' report 30 June 2026 Option holding The number of options over ordinary shares in the Company held during the financial year by each Director and other KMP of the Consolidated Entity, including their personally related parties, is set out below: Name D Jones R Scrimgeour B Kay J Champion de Crespigny M Connelly A Shave D Thornton E O’Connor S Guillaume
Year 2026 2025 2026 2025 2026 2025 2026 2025 2026 2025 2026 2025 2026 2025 2026 2025 2026 2025
Balance at start Issued during the year of year1 2,000,000 2,000,000
Exercised during period (2,000,000)
Balance at end of year 2,000,000
Vested and exercisable 2,000,000
(1) The options disclosed in the above table were issued in FY24 at various exercise prices. No further options have been issued.
Performance rights holding The number of performance rights over ordinary shares in the Company held during the financial year by each Director and other KMP of the Consolidated Entity, including their personally related parties, is set out below: Name D Jones R. Scrimgeour B. Kay J. Champion de Crespigny M Connelly A Shave D Thornton E O’Connor S Guillaume Total
Financial Year FY26 FY25 FY26 FY25 FY26 FY25 FY26 FY25 FY26 FY25 FY26 FY25 FY26 FY25 FY26 FY25 FY26 FY25 FY26 FY25
Balance at start Issued during the year1 of year 600,000 800,000 3,534,188 944,758 1,000,000 3,534,188 924,757 400,641 524,116 224,621 29,075 224,621 5,283,566 973,833 2,200,641 4,282,925
Exercised during period (200,000) (1,000,000) (1,200,000)
Balance at end of year 600,000 600,000 4,478,946 3,534,188 924,757 924,757 253,696 224,621 6,257,399 5,283,566
(1) Performance rights are subject to performance measurement periods. Refer to previous sections of the Remuneration Report for number of performance rights converted into shares subsequent to 30 June 2026.
33
Catalyst Metals Limited Directors' report 30 June 2026 Performance Rights Summary The following table details the terms and conditions of each grant of performance rights over ordinary shares affecting remuneration of Directors and other KMP in this financial year or future reporting years are as follows:
Name J Champion de Crespigny J Champion de Crespigny J Champion de Crespigny J Champion de Crespigny J Champion de Crespigny J Champion de Crespigny J Champion de Crespigny J Champion de Crespigny B Kay D Thornton D Thornton D Thornton D Thornton S Guillaume S Guillaume S Guillaume S Guillaume
Number of rights granted 106,838 142,450 284,900 3,000,000 603,982 219,629 79,958 41,191 600,000 291,666 108,975 381,557 142,559 163,524 61,097 19,189 9,886
Grant date
Expected vesting date
14/11/2024 14/11/2024 14/11/2024 14/11/2024 13/11/2025 13/11/2025 13/11/2025 13/11/2025 17/11/2023 31/03/2024 31/03/2024 05/02/2025 05/02/2025 05/02/2025 05/02/2025 24/04/2026 24/04/2026
30/06/2026 30/06/2026 30/06/2026 30/06/2029 30/06/2027 30/06/2027 30/06/2028 30/06/2028 30/06/2028 30/06/2026 30/06/2026 30/06/2027 30/06/2027 30/06/2027 30/06/2027 30/06/2028 30/06/2028
Expiry date 30/06/2027 30/06/2027 30/06/2027 30/06/2030 30/06/2028 30/06/2028 30/06/2029 30/06/2029 30/06/2029 30/06/2027 30/06/2027 30/06/2028 30/06/2028 30/06/2028 30/06/2028 30/06/2029 30/06/2029
90 day VWAP (at
Fair value per right at grant commencement date (as required of performance period)
under IFRS)
$0.94 $0.94 $0.94 N/A $0.83 $0.83 $6.19 $6.19 N/A $0.94 $0.94 $0.83 $0.83 $0.83 $0.83 $6.19 $6.19
$2.641,2,3 $2.632,3,4 $2.641,2,3 $2.641,2,5 $7.441,7 $7.447,8 $7.441,7 $4.947,9 $0.801 $0.691,3 $0.403,6 $3.871 $3.3510 $3.871 $3.3510 $6.281 $3.2211
(1)
Fair value based on closing share price at grant date (as no market-based performance hurdle).
(2)
Performance Rights that were granted to the Managing Director & Chief Executive Officer under the Catalyst Metals Employee Incentive Plan at the FY24 Annual General Meeting on 14 November 2024.
(3)
Performance rights all vested and the performance rights were converted into ordinary shares on 13 August 2026
(4)
Fair value based on independent valuation (as tranche of LTI has a market based relative Total Shareholder Return (TSR) hurdle). Valuation was based on the following variables: share price $2.64, nil exercise price, risk free interest rate 4.19%, volatility 70%, time to expiry 1.62 years.
(5)
The performance rights are yet to vest and will be tested at the end of the five-year measurement period which ends on 30 June 2029. The rights will vest should the following annual production rates be achieved: 1) 1,000,000 rights upon 150,000oz pa; 2) 1,000,000 rights upon 175,000oz pa; 3) 1,000,000 rights upon 200,000oz pa.
(6)
Fair value based on independent valuation (as tranche of LTI has a market based relative Total Shareholder Return (TSR) hurdle). Valuation was based on the following variables: share price $0.69, nil exercise price, risk free interest rate 3.74%, volatility 60%, time to expiry 2.3 years.
(7)
Performance Rights that were granted to the Managing Director & Chief Executive Officer under the Catalyst Metals Employee Incentive Plan at the FY25 Annual General Meeting on 13 November 2025.
(8)
Fair value based on independent valuation (as tranche of LTI has a market based relative Total Shareholder Return (TSR) hurdle). Valuation was based on the following variables: share price $7.44, nil exercise price, risk free interest rate 3.73%, volatility 70%, time to expiry 1.6 years.
(9)
Fair value based on independent valuation (as tranche of LTI has a market based relative Total Shareholder Return (TSR) hurdle). Valuation was based on the following variables: share price $7.44, nil exercise price, risk free interest rate 3.80%, volatility 70%, time to expiry 2.6 years.
(10) Fair value based on independent valuation (as tranche of LTI has a market based relative Total Shareholder Return (TSR) hurdle). Valuation was based on the following variables: share price $3.41, nil exercise price, risk free interest rate 3.92%, volatility 70%, time to expiry 2.4 years. (11) Fair value based on independent valuation (as tranche of LTI has a market based relative Total Shareholder Return (TSR) hurdle). Valuation was based on the following variables: share price $6.28, nil exercise price, risk free interest rate 4.69%, volatility 70%, time to expiry 2.2 years.
Loans to key management personnel There were no loans made to, and no loan balances outstanding with, KMP or their related parties during the year ended 30 June 2026. Other transactions with key management personnel There were no other transactions with KMP or their related parties during the year ended 30 June 2026 other than those disclosed in this report and in the related party note to the financial statements. This concludes the audited Remuneration Report. 34
Catalyst Metals Limited Directors' report 30 June 2026 SHARES UNDER OPTION Unissued ordinary shares of Catalyst Metals Limited under option at the date of this report are as follows: Grant date 29 June 2023 29 June 2023
Expiry date 26 May 2027 18 August 2027
Exercise price $2.65 $1.79
Number under option 89,275 11,920 101,195
No person entitled to exercise the options had or has any right by virtue of the option to participate in any share issue of the Company or of any other body corporate. SHARES UNDER PERFORMANCE RIGHTS Unissued ordinary shares of Catalyst Metals Limited under performance rights at the date of this report are as follows: Grant date 17 November 2023 22 November 2023 14 November 2024 22 January 2025 22 January 2025 22 January 2025 2 February 2025 13 November 2025 13 November 2025 23 April 2026 24 April 2026 29 June 2026 6 July 2026
Expiry date 30 June 2028 30 June 2028 30 June 2029 30 June 2027 30 June 2029 15 April 2029 30 June 2029 30 June 2027 30 June 2028 30 June 2030 30 June 2028 30 June 2028 30 June 2027
Exercise price $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Number under rights 600,000 100,000 3,000,000 2,614,380 980,965 75,000 400,000 823,611 121,147 500,000 434,692 36,834 200,000 9,886,629
Subsequent to 30 June 2026, 2,366,909 performance rights vested and were converted into 2,366,909 ordinary shares. No person entitled to exercise the performance rights had or has any right by virtue of the performance right to participate in any share issue of the Company or of any other body corporate. INDEMNITY AND INSURANCE OF OFFICERS The Company has entered into indemnity agreements with each of the Directors and executives of the Company. Under the agreements, the Group will indemnify those officers against any claim or for any costs which may arise as a result of work performed in their capacity as a Director or executive and for which they may be held personally liable, except where there is a lack of good faith. During the financial year, the Company paid a premium in respect of a contract to insure the Directors and executives of the Company against a liability to the extent permitted by the Corporations Act 2001. The contract of insurance prohibits disclosure of the nature of the liability and the amount of the premium. INDEMNITY AND INSURANCE OF AUDITOR The Company has not, during or since the end of the financial year, indemnified or agreed to indemnify the auditor of the Company or any related entity against a liability incurred by the auditor. During the financial year, the Company has not paid a premium in respect of a contract to insure the auditor of the Company or any related entity. PROCEEDINGS ON BEHALF OF THE COMPANY No person has applied to the Court under section 237 of the Corporations Act 2001 for leave to bring proceedings on behalf of the Company, or to intervene in any proceedings to which the Company is a party for the purpose of taking responsibility on behalf of the Company for all or part of those proceedings.
35
Catalyst Metals Limited Directors' report 30 June 2026 NON-AUDIT SERVICES Details of the amounts paid or payable to the auditor for services provided during the financial year are outlined in Note 35 to the financial statements. No non-audit services were provided by the auditor during the financial year. Accordingly, no question arises as to whether the provision of non-audit services is compatible with the general standard of independence for auditors imposed by the Corporations Act 2001. The Directors have received the auditor’s independence declaration referred to below and are satisfied that the auditor’s independence requirements under the Corporations Act 2001 have been met. OFFICERS OF THE COMPANY WHO ARE FORMER PARTNERS OF PRICEWATERHOUSECOOPERS There are no officers of the Company who are former partners of PricewaterhouseCoopers. ROUNDING OF AMOUNTS The Company is of a kind referred to in Corporations Instrument 2016/191, issued by the Australian Securities and Investments Commission, relating to 'rounding-off'. Amounts in this report have been rounded off in accordance with that Corporations Instrument to the nearest thousand dollars, or in certain cases, the nearest dollar. AUDITOR’S INDEPENDENCE DECLARATION A copy of the auditor’s independence declaration as required under section 307C of the Corporations Act 2001 is set out immediately after this Directors’ report. AUDITOR RSM Australia Partners resigned as auditor of the Company on 13 November 2025, having obtained the consent of the Australian Securities and Investments Commission to do so. PricewaterhouseCoopers was appointed as auditor with effect from that date and its appointment was approved by shareholders at the Annual General Meeting held on 13 November 2025. PricewaterhouseCoopers continues in office in accordance with section 327 of the Corporations Act 2001. This report is made in accordance with a resolution of Directors, pursuant to section 298(2)(a) of the Corporations Act 2001. On behalf of the Directors
Mark Connelly Chairman 31 August 2026
36
Auditor’s Independence Declaration As lead auditor of Catalyst Metals Limited's financial report and lead auditor of the specified sustainability disclosures within the sustainability report for the year ended 30 June 2026, respectively, we each declare that, having regard to our responsibilities in relation to the respective audit of the financial report and review of the specified sustainability disclosures within the sustainability report, to the best of our knowledge and belief, there have been: a) no contraventions of the auditor independence requirements of the Corporations Act 2001 in relation to the respective audit of the financial report or the review of the specified sustainability disclosures; and b) no contraventions of any applicable code of professional conduct in relation to the respective audit of the financial report or the review of the specified sustainability disclosures.
Craig Heatley Lead auditor (financial report) Partner PricewaterhouseCoopers
Rachel Meadows Lead auditor (sustainability report) Partner PricewaterhouseCoopers
Perth 31 August 2026
PricewaterhouseCoopers, ABN 52 780 433 757 Brookfield Place, Level 15, 125 St Georges Terrace, PERTH WA 6000, GPO Box D198, PERTH WA 6840 T: +61 8 9238 3000, F: +61 8 9238 3999, www.pwc.com.au
pwc.com.au
Liability limited by a scheme approved under Professional Standards Legislation.
Catalyst Metals Limited Sustainability Report 30 June 2026
Catalyst Metals Limited ABN 54 118 912 495
Sustainability Report For the reporting period ended 30 June 2026
38
Catalyst Metals Limited Sustainability Report 30 June 2026 BASIS OF PREPARATION This report presents the climate-related financial disclosures of Catalyst Metals Limited (“Catalyst” or the “Company”) and its consolidated entities (together, the “Group”) for the reporting period from 1 July 2025 to 30 June 2026. It has been prepared in accordance with AASB S2 Climate-related Disclosures, which is the mandatory Australian Sustainability Reporting Standard (ASRS) that has been issued by the Australian Accounting Standards Board (AASB) and the requirements of the Corporations Act 2001. The report outlines the Group’s approach to the identification, assessment, management and disclosure of material climate-related risks and opportunities. The reporting boundary is consistent with that applied in the Group’s consolidated financial statements for the year ended 30 June 2026. Connectivity with financial statements This report has been prepared for the Group and should be read in conjunction with the Group’s consolidated financial statements prepared in accordance with AASB Accounting Standards. It covers a 12-month period for the year ended 30 June 2026 which is aligned with the reporting period of the related consolidated financial statements. In preparing its climate-related financial disclosures, the Group has assessed its own operations and its value chain which includes, amongst others, the joint ventures, and associates of the Group. In the current reporting period, all metrics reported (except for GHG emissions) relate to Catalyst’s own operations and its value chain. For GHG emissions, an operational control approach to accounting for Catalyst’s Scope 1 and 2 GHG emissions has been applied. Climate-related financial information is presented in Australian dollars which is the functional and presentation currency of the company. Transition Relief The Group is reporting under AASB Sustainability Reporting Standards for the first time for its annual reporting period ended 30 June 2026. In preparing this report, the Company has applied the available first-year transition reliefs, including relief from comparative information and Scope 3 greenhouse gas emissions disclosures. Jurisdictional Relief The Company has early adopted the AASB S2025-1 Amendments to Greenhouse Gas Emissions Disclosure requirements to apply jurisdictional relief for reported Scope 1 and 2 emissions under the National Greenhouse and Energy Reporting (NGER) Scheme. Judgement and Measurement Uncertainties The identification of climate-related risks and opportunities was considered using all reasonable and supportable information available without undue cost or effort for a comprehensive understanding of the climate-related risks and opportunities. Where management has made significant judgements, estimates and assumptions this has been disclosed within the AASB S2 Sustainability Report (“this report”). The estimation and measurement of anticipated financial impacts are subjective and based on various estimates and assumptions which are forward looking, long term, and are inherently uncertain by nature. These estimates and assumptions are based on the Company’s current expectations of the impacts of climate risks and opportunities, which may change over time. Any changes in the estimates and assumptions used, may impact the Company’s financial assessment of anticipated risks. Forward Looking Statements This report includes forward looking statements relating to the Company’s climate-related risk and opportunities and scenario analysis. These statements reflect Catalyst’s current expectations and assumptions, based on currently available information. These statements involve known and unknown risks, uncertainties and other factors, many of which are beyond the Company’s control, and may cause Catalyst’s actual results, performance or achievements to differ materially from those expressed or implied by these statements. Forward-looking statements are not a guarantee of or predictions of future outcomes or performance. Measurement uncertainty Climate-related disclosures involve judgement, estimates and assumptions and are therefore subject to measurement uncertainty. This uncertainty arises from data gaps, proxy information, emissions factors (see Metrics & Targets for GHG measurement uncertainty), externally sourced scenario assumptions and the forward-looking nature of climate-related risk and resilience assessments (see Uncertainty in Strategy). Reported information may change as data quality, methodologies and internal processes mature. At the reporting date, the assessment of current and anticipated financial impacts remains primarily qualitative due to the uncertainty associated with climate scenario analysis and the Company’s current stage of climate reporting maturity. 39
Catalyst Metals Limited Sustainability Report 30 June 2026 GOVERNANCE Governance, processes, controls and procedures Catalyst’s governance framework continues to evolve alongside the Group’s growth and transformation from a microcapitalisation explorer to an established ASX 200 gold producer. This growth has increased the scale and complexity of the Group’s operations, including the development of multiple underground and open pit operations across the Plutonic Gold Belt. As the business expands, Catalyst continues to strengthen its governance arrangements to support oversight of strategic, operational and emerging risks, including climate-related risks and opportunities. Climate-related capability is continuing to mature alongside the progressive integration of climate considerations across the Group’s governance, risk management and business planning processes. Catalyst is governed by a Board of Directors comprising four non-executive directors and the Managing Director and CEO. As outlined in the Board Charter, the Board has ultimate responsibility for the governance, oversight and strategic direction of the Company, acting in the best interests of shareholders. Day-to-day management and administration of the Company is delegated to the Managing Director. To support its oversight responsibilities, the Board has established an Audit and Risk Committee (“ARC”, “the Committee”) and a Nomination and Remuneration Committee, which assist in monitoring key areas of governance. The Board retains overall accountability for the Company’s broader risk management and internal control framework. Responsibility for the implementation and operation of these systems is delegated to management, with the Managing Director accountable to the Board for their effectiveness. At the reporting date, oversight of climate-related risks and opportunities is incorporated within the Company’s broader governance and risk management framework and is primarily exercised through the ARC. Dedicated climate governance arrangements are in an early stage of development. Climate related risks and opportunities are considered in the context of the Group’s asset base, operating locations and growth strategy. In the current reporting period, and given the nature, scale and severity of Catalyst’s identified climate-related risks and opportunities, mitigation and adaptation actions identified and implemented to date did not necessitate any material trade-offs requiring the sacrifice of core operations, significant changes to business activities or material reallocations of capital. Figure 1 – Catalyst Climate Governance
Audit and Risk Committee The Board delegates some of its oversight responsibility in relation to accounting and financial reporting and risk management practices to the Audit and Risk Committee, which is made up of at least three members all of whom are non-executive directors. As part of its risk management oversight, the ARC is responsible for overseeing the identification, management and mitigation of material climate change related risks and opportunities, that could reasonably be expected to affect the Company’s prospects and make recommendation to the Board on potential climate risk mitigation objectives to adopt. Prior to mid-2025, climate-related risk oversight has been addressed within Catalyst's broader enterprise risk management framework. During FY2026, the Board formalised this oversight by amending the ARC Charter to include specific reference to climate-related risks and opportunities, and to extend the Committee's existing risk oversight mandate to explicitly include the identification, management and mitigation of material climate-related risks and opportunities, and to make recommendations to the Board on potential climate risk mitigation objectives.
40
Catalyst Metals Limited Sustainability Report 30 June 2026 In the last quarter of the reporting period, formal oversight of climate-related matters by the ARC were established through: • • • •
Receiving updates from management and external advisors on Catalyst’s climate related risks and opportunities Reviewing the outcomes of initial climate risk identification and assessment activities; Overseeing the development of Catalyst’s first climate-related financial disclosures prepared in accordance with AASB S2; and Approving the inaugural climate governance framework, assigning roles and responsibilities across the organisation.
In addition to the risk oversight responsibility, the ARC is also responsible for the following: • •
assessing whether appropriate skills and competencies are available, or will be procured or developed, to oversee strategies designed to respond to climate-related risks and opportunities, if any; reviewing, assessing and making recommendations to the Board regarding material sustainability matters (including climate change, greenhouse gas emissions and energy).
Catalyst’s climate specific governance processes are still being developed, beyond the ARC oversight role. This includes refining of governance responsibilities, rolling-out the dedicated climate governance framework, maintaining a climate risk register, and integrating climate-related considerations into existing governance, risk management, strategy and disclosure processes. Board and ARC Processes The ARC meets at least twice annually, or more frequently as required. It receives reporting from management on emerging risks, control effectiveness and mitigation activities, including climate-related matters where relevant through which the ARC exercises oversight. Matters requiring Board decision are escalated through formal recommendations. During FY26, climate-related matters were specifically tabled at the June 2026 ARC meeting. Skills and competencies The Board collectively possesses experience in strategic planning, business development, risk management, capital markets, health and safety, and environmental and operational management. Climate-related capability is expected to mature as climate considerations are progressively embedded across the Company’s governance framework and broader business functions. The ARC Charter was updated during the reporting period to reflect expectations that members maintain appropriate financial and climate-related competencies relevant to their responsibilities. The Board is responsible for establishing and reviewing the ARC composition on an annual basis. The ARC does not currently hold dedicated climate expertise. The Board has not performed a documented skills gap assessment specific to climate competencies, with climaterelated competencies expected to be considered in following reporting periods, and training and/or targeted appointments considered. In the interim, the ARC can rely, where needed, on independent external advice in relation to climate related matters brought before the Committee to fulfil its oversight role. Management- level governance While the ARC is responsible for oversight of the Company’s risk management and control framework, responsibility for internal control systems and risk management is delegated to the appropriate level of management within the Company with the Managing Director having ultimate responsibility to the Board. Management is responsible for implementing the Company’s strategy and risk management framework including identifying and managing climate-related risks and reporting these to the ARC. At present, day-to-day identification and management of climate-related risks has been delegated to the Chief Financial Officer, reflecting the initial focus on AASB S2 reporting capability. The site level and operational teams support the identification and management of site-specific risks, including those influenced by climate-related factors, and provides operational input to management to support ongoing risk monitoring and assessment processes. Controls, procedures and integration During the financial year ended 30 June 2026, Catalyst focused on establishing foundational processes to support the identification and oversight of climate-related risks and opportunities. As at 30 June 2026, Catalyst had not established dedicated internal controls specific to climate-related data, metrics or disclosures. Climate-related information for this report was compiled through a combination of existing operational data sources (e.g., NGER fuel and electricity records) and review by the Chief Financial Officer, with support from external consultants. Catalyst expects to develop and
41
Catalyst Metals Limited Sustainability Report 30 June 2026 formalise dedicated controls and procedures including integration with existing financial and operational reporting systems and broader governance and risk management processes during FY2027 as reporting maturity increases. Climate-influenced operational risks are currently managed through Catalyst’s risk management framework at an operational level. Processes and internal controls supporting climate-related data, metrics and disclosures are continuing to evolve as Catalyst’s reporting capability matures and regulatory and assurance expectations develop. Targets and incentives Catalyst has not yet established formal climate-related targets, the Board and ARC have not yet been required to oversee target-setting or monitor progress against climate-related targets, nor considered the linkage of climate performance to executive remuneration. As climate governance processes evolve, Catalyst may assess the appropriateness of formal targets and related performance incentives. Refer to Metrics and Targets for further information on the Company's current position and expected next steps in this regard.
42
Catalyst Metals Limited Sustainability Report 30 June 2026 STRATEGY Catalyst Metals Limited is an Australian gold producer focused on the exploration, development and production of gold assets in established Australian mining jurisdictions, with its principal operations located in the Plutonic Gold Belt in Western Australia. The Group’s strategy is to expand production and extend mine life through ongoing reserve growth, operational expansion and continued investment in infrastructure, exploration and long-term asset development. As a gold mining company with operating and development activities across the Plutonic Gold Belt, Catalyst is exposed to climate-related physical risks and emerging transition risks that may affect its operations, financial performance and long-term prospects. These risks are considered in the context of the Group’s asset base, operating locations and growth strategy. In the lead up to developing its first sustainability report under AASB S2, Catalyst has undertaken an assessment of climate-related risks and opportunities across its operations and value chain, incorporating both physical and transition risks. The climate risk and opportunities assessments, including scenario analysis were conducted over the current financial year, supported by external consultants. The assessment relied on a combination of external sources of information, including peer benchmarking, historical weather patterns, climate projections summary and scenario pathways aligned to the AR5 IPCC (Intergovernmental Panel on Climate Change – Fifth Assessment Report) models, as well as NGFS (Network for Greening the Financial System) scenarios for transition risks. These were supplemented by internal sources of information, such as operational process documentations and historical operational data, corporate risk registers and planning documentation. The climate risk and opportunities were identified and assessed for both physical and transition risks across three timehorizons aligned to the business’ operational and planning context as outlined below. Table 1 – Catalyst time horizons Time Horizon
Defined time horizon
Strategic relevance
Short term
~1 year
Operational and budget planning
Medium term
~2-4 years
Asset lifecycle and planned exploration and mine development
Long term
~5-10 years
Long term commercial horizon of ten years
These time horizons are applied consistently across the physical and transition climate related risks and opportunities assessments and climate resilience assessment. They also support the evaluation of near-term operational impacts and longer-term strategic or commercial implications for Catalyst. Based on the assessments undertaken, Catalyst has identified climate related risks that could affect the Company through operational disruption and impacts on productivity, energy transition requirements or regulatory changes. The risks were assessed using Catalyst’s enterprise risk framework, with risks rated High or above considered material. Management also considered whether information about each risk could reasonably be expected to influence decisions made by existing and potential investors, lenders and other creditors, including through its potential effects on cashflows, access to finance or cost of capital. Physical Risks The following physical climate risks have been identified as climate-related risks that could reasonably be expected to affect Catalyst’s cash flows, its access to finance or cost of capital over the short, medium or long term. The risk assessment considered all time horizons but the physical risks identified are only expected to have effects that could reasonably affect Catalyst’s prospects in the medium to long term, based on the expected timeframe for changes in climate variables that can materially impact the business. Physical risks have been aggregated by climate hazard, with each risk reflecting both the chronic change in average conditions and the acute events associated with that hazard.
43
Catalyst Metals Limited Sustainability Report 30 June 2026 Table 2 – Current and anticipated effects of climate related physical risks on Catalyst’s business model and value chain
Physical Climate Risks
Anticipated Impacts
Potential Financial Implications and time horizon
Increased temperature and heat extremes (chronic warming, together with acute heatwave events)
Reduced workforce productivity and increased health and safety risks, including potential temporary suspension or adjustment of activities during extreme heat events; increased cooling and power demand; and additional strain on plant, equipment and processing efficiency
Medium and long term – reduced productivity and increased downtime, higher labour, energy and cooling costs, and higher asset maintenance and replacement costs.
Changes in rainfall patterns, drought and reduced water availability (chronic)
Greater variability in water availability and groundwater quality affecting processing and potable water supply; drier conditions affecting dust suppression, ground stability and site water management systems
Long term – increased cost of water supply and treatment, increased procurement costs, and potential fines and penalties where dust suppression measures are adversely impacted.
Extreme rainfall, flooding and storm events (acute, with increasing frequency and intensity over time)
Disruption to mining, processing and site operations, including flooding of airstrips, haul roads and the Great Northern Highway; delays to the movement of personnel, equipment and supplies; damage to infrastructure and electrical plant; increased safety risks; and, in a severe event, breach of a tailings storage facility with uncontrolled discharge to the environment requiring clean-up
Medium and long term – increased operational downtime and lost production, higher repair, maintenance and asset replacement costs, increased labour and supply costs, and remediation and liability costs in the event of an uncontrolled discharge.
Catalyst has not provided quantitative estimates of the anticipated financial effects of this risk across the short-, mediumand long-term time horizons. Significant uncertainty exists in estimating these effects due to variables such as the timing, severity and geographic extent of the hazards, the duration and extent of any interruption to Catalyst’s operations and the affected parts of the value chain. Therefore, quantitative estimates are not considered to be useful information to the users of this report. Catalyst does not anticipate any material costs in relation to mitigation or controls in the short term. In the medium and long term, it is not possible to quantify the costs of future mitigation or adaptation measures due to the significant uncertainty that arises from the site-specific nature of Catalyst’s operations. It is assumed that existing insurance coverage will be maintained over the short, medium and long-term time horizons. There is no indication that insurance coverage will be impacted based on currently available information, and it is not possible to separately identify the effect of extreme weather events on the cost of insurance premiums. The financial statement line items that may be affected are: • • •
Financial performance/income statement: Revenue and Cost of sales. Financial position/balance sheet: Property, plant and equipment and Inventory Cash flow statement: Net cash flows from operating activities and investing activities.
Physical climate risks are particularly relevant at the Company’s Plutonic operations, where exposure to extreme rainfall and flooding may affect pit water levels, underground access, electrical systems and accommodation infrastructure. Heavy rainfall events may also affect haul roads and site access, impacting the movement of personnel, equipment and consumables. These risks are monitored and managed through site-level operational procedures and risk controls. Increase in intensity and frequency of extreme rainfall events with associated flooding in the long term, pose the greatest risk to Catalyst’s operations, with water levels potentially exceeding designed capacity. Extreme rainfall events and
44
Catalyst Metals Limited Sustainability Report 30 June 2026 flooding tend to impact various aspects of the business, having a compounded effect on costs and financial performance. As at the date of reporting, environmental, health and safety and operational risks posed by extreme weather events are managed as part of the already established operational controls and procedures at site including, trigger-based response systems, water management infrastructure, emergency response protocols and continuity planning arrangements. These are resourced as part of the operating budget of the organisation. Transition Risks The following transition climate risks have been identified as climate-related risks that could reasonably be expected to affect Catalyst’s cash flows, its access to finance or cost of capital over the short, medium or long term. Transition risks tend to arise from the global shift toward a lower-carbon economy. Transition risks are primarily driven by changes in climate policy, regulation, technology, markets and customer behaviour, and may affect operating costs, asset competitiveness, demand for gold products and access to capital over time. Table 3 – Current and anticipated effects of climate related transition risks Transition Climate Risks
Anticipated Impacts
Anticipated Financial Implications and time horizon
Changes in climate related regulation and policy
Increased compliance obligation and potential costs impacts associated with evolving regulatory requirements
Short, medium and long term – increased compliance related costs and liability
Carbon pricing and emissions related costs
Potential increase in operating costs associated with carbon pricing mechanisms or emissions-related obligations
Medium and long term – increased operational costs and additional compliance costs
Changes in investor and stakeholder expectations
Increased scrutiny on sustainability performance which may influence access to capital and stakeholder confidence
Medium and long term – more investment required to improve or demonstrate sustainability performance, loss of access to capital
Changes in energy systems and technology
Potential shifts in energy costs and availability, impacting operational cost structures
Medium and long term – increased in operational costs, increased capital investment required and increased asset impairment
Due to the nature of its operations at the Plutonic mine site (remote, reliance on diesel generated energy and heavy machinery), Catalyst is likely to be highly exposed to regulatory and carbon pricing risk if introduced in the medium term given that it would coincide with peak production based on the current life-of-mine model. Given gold’s position as a safe haven investment, Catalyst and gold producing enterprises are expected to be insulated from market or demand-related changes. Climate related opportunities At the reporting date, Catalyst has not formally identified material climate-related opportunities that could be reasonably expected to impact Catalyst’s prospects for inclusion in its long-term strategy and planning processes. However, the Group recognises that climate-related opportunities may emerge over time as energy markets, technology, regulation and stakeholder expectations continue to evolve. Business model and value chain Catalyst’s business model is centred on gold exploration, mining and processing, with its principal operations located at the Plutonic Gold Operations in Western Australia and additional exploration activities in Victoria through the Bendigo Project. At Plutonic, Catalyst operates an integrated mining and processing model, with exploration, mining, processing and supporting infrastructure located at, or connected to, the mine site. The principal output from the Plutonic operations is gold doré, which is transported by road to a refinery in New South Wales. The efficient operation of the Plutonic site is dependent on the availability of key inputs, including gas, diesel, cyanide, other consumables, equipment, transport services and workforce access to and from the remote mine site. Catalyst is also reliant on critical site infrastructure, road access, air access and supply chain continuity to support production. Climate-related risks and opportunities may affect Catalyst’s business model and value chain through impacts on production continuity, operating costs, infrastructure resilience, access to key inputs and stakeholder expectations.
45
Catalyst Metals Limited Sustainability Report 30 June 2026 These exposures are primarily concentrated around the Plutonic operations and its immediate value chain, given Plutonic is the Group’s core operating asset and revenue driver. The mitigation and adaptation actions outlined below include current and anticipated responses. These actions are at varying stages of maturity and are expected to be further formalised as climate-related considerations are progressively integrated into Catalyst’s governance, risk management, operational planning and strategy processes. Climate-related physical and transition risks have had no impact on Catalyst’s business model and value chain in the current year. The risk exposures identified below are the aggregated physical risks set out in Table 2 and the transition risks set out in Table 3, applied to each key area of the business model and value chain. Table 4 – Business model and value chain exposure
Key area of business model and value chain
Climate-related risk exposure
Current & anticipated mitigation / adaptation
Mining and processing operations
Physical risk (refer Table 2): Extreme rainfall, flooding and storm events may disrupt mining, processing and site operations and damage infrastructure. Increased temperature and heat extremes may reduce workforce productivity and place additional strain on plant and equipment. Changes in rainfall patterns, drought and reduced water availability may affect process and potable water supply and ground stability.
Current - Severe weather contingency planning, including flexible workforce scheduling, ore stockpiling, site drainage and water management, weather monitoring, logistics planning, preventative maintenance and emergency response procedures. (Physical)
Transition risk (refer Table 3): Mining and processing are the Group’s main sources of operational emissions, giving rise to exposure to carbon pricing and emissions related costs and to changes in climate related regulation and policy.
Potential - Heat management procedures, adjusted work schedules, workforce monitoring and maintenance planning for temperature-related equipment stress. (Physical) Current - Monitoring of emissions performance, regulatory thresholds and consideration of emissionsrelated costs in operational and financial planning. (Transition)
Logistics and supply chain
Physical risk (refer Table 2): Extreme rainfall, flooding and storm events may close airstrips, haul roads and the Great Northern Highway, disrupting FIFO workforce movements and the transport of fuel, food, consumables and equipment. Increased temperature and heat extremes may also affect transport safety and scheduling.
Current and Potential - Monitoring of weather conditions, logistics planning, flexible workforce scheduling and stockpiling of ore and critical supplies to support operational continuity during access disruptions.
Energy inputs
Transition risk (refer Table 3): Changes in energy systems and technology, together with carbon pricing and emissions related costs, may increase the cost and affect the availability of diesel and gas and require capital investment in lower emissions energy.
Current & Potential - Evaluation of energy use and consideration of alternative or more efficient energy options over time, including energy efficiency and operational improvements where commercially feasible.
Physical risk (refer Table 2): Increased temperature and heat extremes increase cooling and power demand, while extreme rainfall, flooding and storm events may interrupt power infrastructure and fuel deliveries to site. Downstream stakeholders
Transition risk (refer Table 3): Changes in investor and stakeholder expectations in relation to responsible sourcing, emissions transparency and 46
Current - Backup generation capacity (diesel and PNG, with hired generation available if required), lightning protection on site power infrastructure and preventative maintenance of electrical assets. (Physical)
Current & Potential - Ongoing stakeholder engagement and consideration of climate-related risks within governance, risk management and disclosure processes.
Catalyst Metals Limited Sustainability Report 30 June 2026 sustainability performance may affect stakeholder confidence, access to capital and reputation.
Current - Transfer of risk on sale of gold doré, use of established freight providers and flexibility in transport timing and routing. (Physical)
Physical risk (refer Table 2): Extreme rainfall, flooding and storm events may delay the transport of gold doré to the refinery in Sydney. Given the low volume transported (approximately three tonnes per year) and the transfer of risk on sale of gold doré, this exposure is not considered material.
While a number of these actions are already undertaken as part of existing operational, safety, maintenance and planning processes, Catalyst expects to further formalise and document climate-related mitigation and adaptation responses as its climate governance and reporting processes mature. Strategy and decision-making Climate related risks and opportunities are not currently managed through a standalone climate strategy or formal transition plan. However, exposure to physical hazards, and risks to operational continuity are considered within Catalyst’s existing operational, financial and risk management processes. The Company’s current response has been focused on optimising and managing operational control and risk mitigation measures especially concerning exposure to extreme weather events. The measures are focused on key flood management and response plans, as well as logistics planning and continuity arrangements to mitigate the impact on the business of power, water and transport disruptions. The climate risk and scenario analysis undertaken provides an initial basis for understanding how climate-related risks and opportunities may affect operational planning, cost management and capital allocation, particularly in relation to rainfall variability, extreme heat, water availability, fuel dependency and supply chain disruption. Climate related considerations are expected to be progressively integrated into broader strategy, risk and decision-making processes
Appendix 3Y
Rule 3.19A.2
Change of Director’s Interest Notice Information or documents not available now must be given to ASX as soon as available. Information and documents given to ASX become ASX’s property and may be made public. Introduced 30/09/01 Amended 01/01/11
Name of entity
Catalyst Metals Limited
ABN
54 118 912 495
We (the entity) give ASX the following information under listing rule 3.19A.2 and as agent for the director for the purposes of section 205G of the Corporations Act. Name of Director
James Champion de Crespigny
Date of last notice
14 May 2026
Part 1 - Change of director’s relevant interests in securities
In the case of a trust, this includes interests in the trust made available by the responsible entity of the trust. In the case of a company, interests which come within paragraph (i) of the definition of “notifiable interest of a director” should be disclosed in this part.
Direct or indirect interest
Direct and Indirect
Nature of indirect interest (including registered holder)
Melvista 1 Pty Ltd (Melvista A/C) – Trust Beneficiary
Date of change
12-14 August 2026
Number of securities held prior to change
2,885,833 Fully paid ordinary shares
Note: Provide details of the circumstances giving rise to the relevant interest
106,838 STI Performance Rights 427, 350 LTI Performance Rights 3,000,000 Production Incentive Rights 164,722 FY25 STI Performance Rights 658,889 FY25 LTI Performance Rights 121,147 FY26 LTI Performance Rights STI Performance Rights
Class
LTI Performance Rights Fully paid ordinary shares
- See chapter 19 for defined terms. 01/01/2011 Appendix 3Y Page 1
Appendix 3Y Change of Director’s Interest Notice
Number acquired
Number disposed
Value/Consideration
Note: If consideration is non-cash, provide details and estimated valuation
Number of securities held after change
- 534,188 fully paid ordinary shares were acquired on conversion of 106,838 STI Performance Rights and 427,350 LTI Performance Rights following achievement of vesting conditions
- 106,838, STI Performance Rights and 427,350 LTI Performance Rights were converted into fully paid ordinary shares
- 1,000,000 fully paid ordinary shares were disposed of through on market trades
- The shares acquired on conversion of the STI and LTI Performance Rights were converted for nil consideration
- Total consideration received for shares sold $6,410,050 2,420,021 Fully paid ordinary shares 3,000,000 Production Incentive Rights 164,722 FY25 STI Performance Rights 658,889 FY25 LTI Performance Rights 121,147 FY26 LTI Performance Rights
Nature of change
Example: on-market trade, off-market trade, exercise of options, issue of securities under dividend reinvestment plan, participation in buy-back
- Conversion of vested Performance Rights
- On market trades
Part 2 – Change of director’s interests in contracts In the case of a company, interests which come within paragraph (ii) of the definition of “notifiable interest of a director” should be disclosed in this part.
Details of contract
N/A
Nature of interest
N/A
Name of registered holder (if issued securities)
N/A
Date of change
N/A
Number and class of securities to which interest related prior to change
N/A
Interest acquired
N/A
Interest disposed
N/A
Note: Details are only required for a contract in relation to which the interest has changed
- See chapter 19 for defined terms. 01/01/2011
Appendix 3Y Page 2
Appendix 3Y Change of Director’s Interest Notice Value/Consideration
Note: If consideration is non-cash, provide details and an estimated valuation
N/A
Interest after change
N/A
Part 3 – +Closed period Were the interests in the securities or contracts detailed above traded during a +closed period where prior written clearance was required?
No
If so, was prior written clearance provided to allow the trade to proceed during this period?
N/A
If prior written clearance was provided, on what date was this provided?
N/A
- See chapter 19 for defined terms. 01/01/2011 Appendix 3Y Page 3
ASX Announcement 14 August 2026
Catalyst Metals’ flagship asset is the 40km long Plutonic Gold Belt in Central Western Australia. This belt currently produces ~100koz pa at a target AISC of A$2,800/oz from three mines at Plutonic Main Plutonic East and K2. Catalyst is currently bringing three new mines into production – Trident UG, Cinnamon & Old Highway. Each will be processed through the existing, underutilised and centrally located 2Mtpa CIL processing plant. Exploration is targeting down dip extensions of each of these deposits. With the development and exploration of these five deposits, Catalyst aims to increase Reserves and production from 1.5Moz to ±2Moz and ±100koz to ±200koz annually. In so doing, Catalyst is aiming for Plutonic to have a 10 year mine life - a unique and rare proposition for an underground Western Australian gold mine. Catalyst also controls a processing plant and +75km of strike length immediately north of the historic +22Moz Bendigo goldfield. Here, Catalyst has delineated a high-grade, greenfield resource at 26 g/t Au. Further discoveries along strike are expected.
Catalyst expands treasury to A$531m by increasing its corporate credit facility from A$100m to A$200m • Catalyst has increased its Revolving Credit Facility from A$100m to A$200m • Available credit facility remains undrawn • A fourth lender, HSBC, has been included to the existing syndicate, which includes Westpac, National Australia Bank (NAB) and Societe Generale
• The terms of the facility are consistent with the previous facility. Key changes include:
Increase in tenor from three to four years
Increase in facility size to A$200m
Hedging facilities provided by Westpac, NAB and HSBC
• This RCF provides additional liquidity and flexibility as Catalyst pursues its growth plans • At 30 June 2026, Catalyst held cash and bullion of A$331m and remained debt free. The undrawn RCF provides available liquidity of A$531m Catalyst Metals Limited (Catalyst or the Company) (ASX:CYL) is pleased to announce it has signed formal documentation to extend and upsize its existing revolving credit facility (RCF). At financial close, the RCF will be increased to A$200m and extended to a four-year tenor. All existing lenders including Westpac, National Australia Bank and Societe Generale were supportive of the expanded facility. HSBC has also joined the syndicate. In the past three years, Catalyst has generated over A$525m in operating cash flow, allowing it to develop four new mines, double Reserves to 1.5Moz and invest in supporting infrastructure. It has also strengthened its balance sheet, paying down inherited liabilities and at 30 June 2026 held cash and bullion of A$331m. With the addition of this undrawn A$200m RCF, the business has A$531m in available liquidity and is well placed to execute the next phase of its growth plans. Catalyst’s Managing Director & CEO, James Champion de Crespigny, commented:
Capital Structure Shares o/s: 261m Options: 0.5m Rights: 12.2m Cash & Bullion: A$331m Debt: Nil Reserve and Resource1,2
“We would like to thank NAB, Westpac and Societe Generale for their continued support of Catalyst. We also welcome, and thank, HSBC in joining the syndicate. Over the past two years, Catalyst has progressively de-risked the longer terms ±200koz organic growth strategy3. The ongoing support of our relationship banks in this upsize, reflects that progressive de-risking.”
MRE: 4.5Moz at 3.3g/t Au ORE: 1.5Moz at 2.6g/t Au Corporate Details ASX: CYL E:investors@catalystmetals .com.au W:catalystmetals.com.au Note 1: MRE includes Indicated Resources of 29Mt at 2.9g/t for 2.7Moz and Inferred Resources of 9Mt at 2.7g/t for 0.8Moz. ORE includes probable Reserves of 10.6Mt at 3.0g/t for 1.0Moz. Note 2: Refer to ASX announcement 11 October 2024 “Annual Update of Mineral Resource and Ore Reserve Statement” Note 3 ASX announcement 10 September 2025 ““Plutonic Belt Reserves double, supporting long term growth plans” and “Investor Presentation”
The RCF contains covenants typical for such a facility, including conditions precedent and third-party consents. These have not changed since the prior facility and include: Term
Prior facility
Current facility
Revolving credit facility limit
A$100m
A$200m
Tenor
3 years
4 years
Hedging
Provided by Westpac and NAB
Now includes HSBC
Interest
Fixed margin above BBSY
No change
Financial covenants Security
Minimum liquidity, Reserve tail, net debt to EBITDA and interest coverage Share and all asset security of Plutonic subsidiaries
No change No change
Taylor Collison acted as financial advisors and Lavan Legal as legal advisors to Catalyst
This report has been approved for release by the Board of Directors of Catalyst Metals Limited. Investors and Media: Craig Dingley Catalyst Metals T: +61 (8) 6324 0900 [email protected]
JORC 2012 Mineral Resources, Ore Reserves, Exploration Results and Production Target The information in this report that relates to a production target or estimates of mineral resources and ore reserves are extracted from ASX announcements referenced and are available on the Company website www.catalystmetals.com.au and the ASX website (ASX code: CYL): Catalyst confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcements. Catalyst confirms that all material assumptions underpinning the production target, or the forecast financial information derived from a production target, in the initial public report continue to apply and have not materially changed.
Appendix 3B - Proposed issue of securities
Announcement Summary
Entity name CATALYST METALS LIMITED Announcement Type New announcement Date of this announcement 13/8/2026 The Proposed issue is: A placement or other type of issue Total number of +securities proposed to be issued for a placement or other type of issue
ASX +security code
+Security description
CYL
ORDINARY FULLY PAID
Maximum Number of +securities to be issued 313,448
Proposed +issue date 12/10/2026 Refer to next page for full details of the announcement
Appendix 3B - Proposed issue of securities
1/5
Appendix 3B - Proposed issue of securities
Part 1 - Entity and announcement details
1.1 Name of +Entity CATALYST METALS LIMITED We (the entity named above) give ASX the following information about a proposed issue of +securities and, if ASX agrees to +quote any of the +securities (including any rights) on a +deferred settlement basis, we agree to the matters set out in Appendix 3B of the ASX Listing Rules. If the +securities are being offered under a +disclosure document or +PDS and are intended to be quoted on ASX, we also apply for quotation of all of the +securities that may be issued under the +disclosure document or +PDS on the terms set out in Appendix 2A of the ASX Listing Rules (on the understanding that once the final number of +securities issued under the +disclosure document or +PDS is known, in accordance with Listing Rule 3.10.3C, we will complete and lodge with ASX an Appendix 2A online form notifying ASX of their issue and applying for their quotation). 1.2 Registered Number Type
Registration Number
ACN
118912495
1.3 ASX issuer code CYL 1.4 The announcement is New announcement 1.5 Date of this announcement 13/8/2026 1.6 The Proposed issue is: A placement or other type of issue
Appendix 3B - Proposed issue of securities
2/5
Appendix 3B - Proposed issue of securities
Part 7 - Details of proposed placement or other issue
Part 7A - Conditions
7A.1 Do any external approvals need to be obtained or other conditions satisfied before the placement or other type of issue can proceed on an unconditional basis? No
Part 7B - Issue details
Is the proposed security a 'New class' (+securities in a class that is not yet quoted or recorded by ASX) or an 'Existing class' (additional securities in a class that is already quoted or recorded by ASX)? Existing class
Will the proposed issue of this +security include an offer of attaching +securities? No
Details of +securities proposed to be issued ASX +security code and description CYL : ORDINARY FULLY PAID Number of +securities proposed to be issued 313,448 Offer price details Are the +securities proposed to be issued being issued for a cash consideration? No
Please describe the consideration being provided for the +securities The Shares are being issued in consideration for the acquisition of mining tenements pursuant to an Asset Purchase Agreement Please provide an estimate of the AUD equivalent of the consideration being provided for the +securities 2,000,000.000000 Will these +securities rank equally in all respects from their issue date with the existing issued +securities in that class? Yes
Appendix 3B - Proposed issue of securities
3/5
Appendix 3B - Proposed issue of securities
Part 7C - Timetable
7C.1 Proposed +issue date 12/10/2026
Part 7D - Listing Rule requirements
7D.1 Has the entity obtained, or is it obtaining, +security holder approval for the entire issue under listing rule 7.1? No 7D.1b Are any of the +securities proposed to be issued without +security holder approval using the entity's 15% placement capacity under listing rule 7.1? Yes 7D.1b ( i ) How many +securities are proposed to be issued without security holder approval using the entity's 15% placement capacity under listing rule 7.1? 313,448 Shares 7D.1c Are any of the +securities proposed to be issued without +security holder approval using the entity's additional 10% placement capacity under listing rule 7.1A (if applicable)? No 7D.2 Is a party referred to in listing rule 10.11 participating in the proposed issue? No 7D.3 Will any of the +securities to be issued be +restricted securities for the purposes of the listing rules? No 7D.4 Will any of the +securities to be issued be subject to +voluntary escrow? No
Part 7E - Fees and expenses
7E.1 Will there be a lead manager or broker to the proposed issue? No 7E.2 Is the proposed issue to be underwritten? No 7E.4 Details of any other material fees or costs to be incurred by the entity in connection with the proposed issue
Part 7F - Further Information
7F.01 The purpose(s) for which the entity is issuing the securities The Shares are being issued in consideration for the acquisition of mining tenements pursuant to an Asset Purchase Agreement 7F.1 Will the entity be changing its dividend/distribution policy if the proposed issue proceeds? No 7F.2 Any other information the entity wishes to provide about the proposed issue
7F.3 Any on-sale of the +securities proposed to be issued within 12 months of their date of issue will comply with the secondary sale provisions in sections 707(3) and 1012C(6) of the Corporations Act by virtue of: Appendix 3B - Proposed issue of securities
4/5
Appendix 3B - Proposed issue of securities The publication of a cleansing notice under section 708A(5), 708AA(2)(f), 1012DA(5) or 1012DAA(2)(f)
Appendix 3B - Proposed issue of securities
5/5
Appendix 2A - Application for quotation of securities
Announcement Summary
Entity name CATALYST METALS LIMITED Announcement Type New announcement Date of this announcement Thursday August 13, 2026 The +securities to be quoted are: +Securities issued, transferred or re-classified as a result of options being exercised or other +convertible securities being converted Total number of +securities to be quoted ASX +security code
Security description
CYL
ORDINARY FULLY PAID
Number of +securities to be quoted
Issue date
2,366,909
13/08/2026
Refer to next page for full details of the announcement
Appendix 2A - Application for quotation of securities
1/6
Appendix 2A - Application for quotation of securities
Part 1 - Entity and announcement details
1.1 Name of entity CATALYST METALS LIMITED We (the entity named above) apply for +quotation of the following +securities and agree to the matters set out in Appendix 2A of the ASX Listing Rules. 1.2 Registered number type
Registration number
ACN
118912495
1.3 ASX issuer code CYL 1.4 The announcement is New announcement 1.5 Date of this announcement 13/8/2026
Appendix 2A - Application for quotation of securities
2/6
Appendix 2A - Application for quotation of securities
Part 2 - Type of Issue
2.1 The +securities to be quoted are: +Securities issued, transferred or re-classified as a result of options being exercised or other +convertible securities being converted 2.2 The +class of +securities to be quoted is: Additional +securities in a class that is already quoted on ASX ("existing class")
Appendix 2A - Application for quotation of securities
3/6
Appendix 2A - Application for quotation of securities
Part 3B - number and type of +securities to be quoted (existing class) where issue has not previously been notified to ASX in an Appendix 3B
Existing +securities converting into additional +securities in an existing class FROM (Existing Class) ASX +security code and description CYLAQ : PERFORMANCE RIGHTS
TO (Existing Class) ASX +security code and description CYL : ORDINARY FULLY PAID Please state the number of options that were exercised or other +convertible securities that were converted
The first date the options were exercised or other +convertible securities were converted
The last date the options were exercised or other +convertible securities were converted
13/8/2026
13/8/2026
2,366,909 Is this all of the options or other +convertible securities on issue of that type (ie have all of those options now been exercised or have all of those convertible securities now been converted)? No The right of the holder of the options or other +convertible securities to receive the +underlying securities is being satisfied by: An issue of new +securities The underlying +securities being received by the holder are: Intended to be, but are not yet, quoted by ASX Were the options being exercised or other +convertible securities being converted issued under an +employee incentive scheme? Yes Are any of the options being exercised or other +convertible securities being converted held by +key management personnel (KMP) or an +associate? Yes Provide details of the KMP or +associates who are exercising options or converting convertible securities
Name of KMP
Name of registered holder
Number of options being exercised or other +convertible securities being converted
James Champion de Crespigny
Melvista 1 Pty Ltd <Melvista A/C>
534,188
Issue date 13/8/2026 Will the +securities to be quoted rank equally in all respects from their issue date with the existing issued +securities in that class? Yes
Appendix 2A - Application for quotation of securities
4/6
Appendix 2A - Application for quotation of securities Issue details
Number of +securities to be quoted 2,366,909 Are the +securities being issued for a cash consideration? No Please describe the consideration being provided for the +securities The Share are being issued on conversion of Performance Rights issued under the Company Employee Incentive Plan Please provide an estimate (in AUD) of the value of the consideration being provided per +security for the +securities to be quoted 6.500000 Any other information the entity wishes to provide about the +securities to be quoted
Appendix 2A - Application for quotation of securities
5/6
Appendix 2A - Application for quotation of securities
Part 4 - Issued capital following quotation
Following the quotation of the +securities the subject of this application, the issued capital of the entity will comprise: The figures in parts 4.1 and 4.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing. 4.1 Quoted +securities (total number of each +class of +securities quoted on ASX following the +quotation of the +securities subject of this application) ASX +security code and description
Total number of +securities on issue
CYL : ORDINARY FULLY PAID
263,669,017
4.2 Unquoted +securities (total number of each +class of +securities issued but not quoted on ASX) ASX +security code and description
Total number of +securities on issue
CYLAW : OPTION EXPIRING 26-MAY-2027 EX $2.65
89,275
CYLAX : OPTION EXPIRING 18-AUG-2027 EX $1.79
11,920
CYLAQ : PERFORMANCE RIGHTS
Appendix 2A - Application for quotation of securities
11,706,281
6/6
Appendix 3H - Notification of cessation of securities
Announcement Summary
Entity name CATALYST METALS LIMITED Announcement Type New announcement Date of this announcement Thursday August 13, 2026 Details of +securities that have ceased
ASX +security code
Security description
CYLAQ
PERFORMANCE RIGHTS
Number of +securities that have ceased 2,163,593
The +securities have ceased due to
Date of cessation
Lapse of conditional right to securities because the conditions have not been, or have become incapable of being, satisfied
13/08/2026
Refer to next page for full details of the announcement
Appendix 3H - Notification of cessation of securities
1/4
Appendix 3H - Notification of cessation of securities
Part 1 - Announcement Details
1.1 Name of +Entity CATALYST METALS LIMITED We (the entity named above) provide the following information about our issued capital. 1.2 Registered Number Type
Registration Number
ACN
118912495
1.3 ASX issuer code CYL 1.4 The announcement is New announcement 1.5 Date of this announcement 13/8/2026
Appendix 3H - Notification of cessation of securities
2/4
Appendix 3H - Notification of cessation of securities
Part 2 - Details of +equity securities or +debt securities that have ceased
ASX +Security Code and Description CYLAQ : PERFORMANCE RIGHTS Unquoted +equity securities that have ceased Number of securities that have ceased 2,163,593 Reason for cessation Lapse of conditional right to securities because the conditions have not been, or have become incapable of being, satisfied Date of cessation 13/8/2026
Is the entity paying any consideration for the cessation? No
Any other information the entity wishes to notify to ASX about the cessation?
Appendix 3H - Notification of cessation of securities
3/4
Appendix 3H - Notification of cessation of securities
Part 3 - Issued capital following changes
Following the cessation of the +securities the subject of this notification, the issued capital of the entity will comprise: The figures in parts 3.1 and 3.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing. 3.1 Quoted +equity securities and +debt securities (total number of each +class of +securities quoted on ASX) ASX +security code and description CYL : ORDINARY FULLY PAID
Total number of +securities on issue 261,302,108
3.2 Unquoted +equity securities (total number of each +class of +equity securities issued but not quoted on ASX) ASX +security code and description
Total number of +securities on issue
CYLAW : OPTION EXPIRING 26-MAY-2027 EX $2.65
89,275
CYLAX : OPTION EXPIRING 18-AUG-2027 EX $1.79
11,920
CYLAQ : PERFORMANCE RIGHTS
11,909,597
Note: the figures stated in the tables above are used to calculate the total market capitalisation of the entity published by ASX from time to time. The table will not include those classes of +securities that have ceased or lapsed in their entirety in ASX records before the announcement date described in Q1.5, even if the entity has advised ASX of a change to that class of +security in Part 2 of this form.
Appendix 3H - Notification of cessation of securities
4/4
Prompts
Click prompts to add them under the company line, click again to take one out, then copy the result into your AI chat. Shared by Asian Century Stocks and Uncovered Thai Stocks. Thank you.
ETFs Holding Catalyst Metals Limited
Exchange-traded funds whose newest published daily portfolio holds one of the company's listings, largest weight first.
| ETF | Weight in ETF | Shares | Market value | As of |
|---|---|---|---|---|
| GDMN | 0.09% | 40,196 | $ 187.818K | Aug 31, 2026 |
| AVDV | 0.08% | 5,662,097 | $ 15.894M | Nov 16, 2026 |
| AVDS | 0.04% | 47,949 | $ 134.595K | Nov 16, 2026 |
| AVSD | 0.02% | 23,185 | $ 65.081K | Nov 16, 2026 |
| DXIV | 0.02% | 12,422 | $ 36.883K | Nov 12, 2026 |
| DFIS | 0.01% | 288,926 | $ 857.867K | Nov 12, 2026 |
| AVDE | 0.01% | 651,812 | $ 1.83M | Nov 16, 2026 |
| DFSI | 0.01% | 30,383 | $ 90.212K | Nov 12, 2026 |
| DFIC | 0.01% | 287,433 | $ 853.434K | Nov 12, 2026 |
| DISV | 0.00% | 80,779 | $ 240.9K | Nov 12, 2026 |
| DFAI | 0.00% | 193,270 | $ 573.849K | Nov 12, 2026 |
| DFAX | 0.00% | 107,504 | $ 319.196K | Nov 12, 2026 |