|
Brightstar Resources Limited is a gold mining company engaged in mineral exploration, mining operations, mine development, and the sale of gold in Western Australia. The company operates two primary project hubs: the Goldfields Project and the Sandstone Project. Under the Goldfields hub, Brightstar manages the Second Fortune and Fish underground mines and is constructing a 1.5Mtpa Laverton processing plant, with construction executed by GR Engineering Services Limited. The Sandstone hub includes the Two Mile Hill-Shillington and Bull Oak areas, where the company completed the strategic acquisition of Aurumin Limited to consolidate its regional position. Brightstar processes ore through an Ore Purchase Agreement with Genesis Minerals Limited and sells gold to the market. The company’s portfolio includes mineral resources across the Laverton, Menzies, and Sandstone districts, with a focus on advancing the Goldfields Definitive Feasibility Study and the Sandstone Pre-Feasibility Study. Summarised from the company's own disclosures, fiscal year ended Jun 2026 |
Industry Materials | Homepage brightstarresources.com.au |
| Sector Basic Materials | IR page brightstarresources.com.au/investor | |
|
Tags
gold mining, mineral exploration, underground mining, ore processing, mine development, gold sales, Goldfields Project, Sandstone Project, Second Fortune, Fish, Laverton processing plant, GR Engineering Services Limited, Genesis Minerals Limited, Aurumin Limited, Two Mile Hill-Shillington, Bull Oak, Menzies
|
Press page — |
Metrics
| Valuation | |
|---|---|
| Market cap | A$ 687.019M |
| Market cap (USD) | $ 541.965M |
| P/E | -11.33 |
| PEG | — |
| P/BV | 0.61 |
| P/S | 10.71 |
| P/OCF | -20.27 |
| P/FCF | — |
| Dividend yield | — |
| Turnover / mcap | — |
| Returns | |
|---|---|
| ROE | -25.6% |
| ROI | -14.4% |
| ROIC | -10.4% |
| Profit margin | -119.9% |
| Growth | |
|---|---|
| Revenue growing | Yes |
| Profits growing | No |
| Revenue up 3y | — |
| Revenue up 5y | — |
| Earnings growth 3y (net profit CAGR) | — |
| Quality | |
|---|---|
| Profitable | No |
| Margin expanding | Yes |
| Buying back stock | No |
| Diluting (TTM) | — |
| Debt/Equity | 42.9% |
| Podcast bulls (TTM) | Sign up |
| Podcast bears (TTM) | Sign up |
| Podcast sentiment (TTM) | Sign up |
| Podcast sentiment % (TTM) | Sign up |
| News sentiment (TTM) | 0 |
| Quality score | 0% |
| Insiders | |
|---|---|
| Buys, 1w | Sign up |
| Buys, 1m | Sign up |
| Buys, 1y | Sign up |
| Sells, 1w | Sign up |
| Sells, 1m | Sign up |
| Sells, 1y | Sign up |
Podcast Mentions
Announcements lodged with ASX, newest first, routine forms (director and substantial-holding notices, daily buy-back and quotation notices) included. The link opens the announcement on ASX. Press releases from the company's own website, newest first.
PROJECT & CORPORATE DEVELOPMENT o Construction of the 1.5Mtpa Laverton processing plant advancing on schedule and within budget, with the Goldfields Project on track for first gold in JunQ‘27 o Bulk earthworks completed for the process plant infrastructure (July) and the raw and process water ponds (August) o CIL circuit concrete completed, enabling the CIL tank installation team to commence on site ahead of schedule, and first mechanical equipment delivered to site o Post quarter-end, Brightstar reported September construction progress (13 October 2026): ▪ Final major concrete pour completed in the primary crusher area, with concrete works also completed at the surge bin ▪ First structural steel erection commenced at the surge bin, with CIL tank platework and strake welding also underway ▪ Earthworks and civil concrete works commenced at the LNG power station, with civil works advancing in the gold recovery and elution areas, reagents area civil works commencing and borefield development continuing o Power Purchase Agreement and LNG Supply Agreement executed in July for the Laverton mill power station, with engineering progressing and major long-lead equipment secured o Binding Tenement Sale Agreement executed to acquire Panther Metals Limited’s Mikado Project tenements for $350,000 cash, securing strategic infrastructure tenure adjacent to the Laverton processing plant and de-risking the 2.5Mtpa expansion case o Non-binding Strategic Partnership Heads of Agreement with Panther Metals under which Brightstar would fund, mine and process the Burtville East gold deposit through the Laverton processing plant, with net proceeds shared 50:50 after recovery of Brightstar’s costs o Goldfields Project targeted to produce ~75koz p.a. from FY28 for an initial six-year mine life, with parallel work ongoing on mine-life extensions and the 2.5Mtpa throughput upside scenario o Post quarter-end, assay results for TMHDD26003, the first hole of the ~3,800m deep diamond drilling program at Two Mile Hill, returned 305m @ 1.33g/t Au from 584m within the host tonalite, including 173m @ 1.42g/t Au from 716m beneath the current 1.45Moz Mineral Resource, demonstrating that the mineralised tonalite continues below the current Mineral Resource and remains open at depth o Post quarter-end, on 27 October 2026, Brightstar received binding commitments to raise A$82 million (before costs) through a single-tranche placement of 164 million New Shares at A$0.50 per share, with Genesis Minerals Limited (ASX: GMD) subscribing for A$30 million and will become a 5.4% strategic shareholder
BRIGHTSTAR RESOURCES LIMITED 2
ACN 100 727 491 brightstarresources.com.au ASX: BTR
o The Company ended the quarter with $58.7 million in cash on hand and undrawn net bond
proceeds of $161.4 million. Total liquidity of $220.1 million
OPERATIONS
o Safety performance across the Group remained strong, with no Lost Time Injuries (LTIs) recorded
during the quarter
o Underground mining at Second Fortune concluded in August in line with the DFS 2.0 plan,
with the mine safely transitioned into care and maintenance (C&M) after six years of LTI-free
operation
o Second Fortune mining production in the September quarter of 17.5kt @ 3.41g/t Au for 1,923oz,
with high-grade stockpiles of ~62kt @ 3.1g/t Au for ~6.2koz (Second Fortune and Fish
combined high-grade stockpile) to provide ramp-up feed following commissioning of the
Laverton processing plant
o The Fish mine remained in C&M through the quarter, with underground diamond drilling
completed to improve the grade control for the Stage 2 mine plan.
o Post quarter-end, Brightstar reported that site establishment works have commenced at the
Lord Byron open pit, with mining development activities underway to prepare the site for non-
process infrastructure, site offices and the open pit operations team ahead of mining
mobilisation targeted for early MarQ’27
EXPLORATION ACTIVITIES & MINERAL RESOURCES
o Two Mineral Resource updates increased the Sandstone Gold Project resource to 79.4Mt @
1.4g/t Au for 3.6Moz, including Indicated Mineral Resources of 30.4Mt @ 1.5g/t Au for
1.5Moz
2,6
. The July interim update increased total resources by 18% to 2.9Moz and more than
doubled the Indicated component to 1.14Moz. Subsequent growth at Two Mile Hill increased the
Sandstone resource to 3.6Moz and Brightstar’s Group resource to approximately 5.2Moz.
Changes reflect additional drilling, revised geological interpretations and reporting cut-offs,
supporting the ongoing Sandstone Pre-Feasibility Study (PFS).
o Two Mile Hill-Shillington Mineral Resource update
6
: The September resource increased by
98% from the July estimate to 24.6Mt @ 1.8g/t Au for 1.45Moz. Indicated resources increased
by 177% to 10.4Mt @ 1.6g/t Au for 526koz, while the Two Mile Hill underground component
increased to 19.7Mt @ 2.0g/t Au for 1.26Moz.
▪ The update will inform underground mining studies and the PFS. Assays from the
four-hole deep Shirvington Zone program remained pending and were not
incorporated, although geological observations informed interpretation of the host
tonalite.
o Infill and extensional drilling results were reported across the Sandstone and Goldfields projects,
supporting resource evaluation, geological confidence and development studies. Selected results
are summarised below:
BRIGHTSTAR RESOURCES LIMITED 3 ACN 100 727 491 brightstarresources.com.au ASX: BTR Sandstone Hub o Two Mile Hill 1,3,5
▪ TMHRCD26020: Broad, unconstrained 305.4m @ 1.82g/t Au from 351.9m, including 17.5m @ 9.68g/t Au from 351.9m and 34.6m @ 4.11g/t Au from 586.7m ▪ TMHRCD26006A: Broad, unconstrained 225.7m @ 3.11g/t Au from 284m, including 19m @ 24.3g/t Au from 306m ▪ TMHRCD26018: 4m @ 58.7g/t Au from 140m o Bull Oak 1
▪ BORCD26007: 5.75m @ 13.1g/t Au from 518.25m, including 0.90m @ 81.1g/t Au, within a broad, unconstrained 157.48m @ 0.60g/t Au from 398.92m ▪ BORCD26004: Broad, unconstrained 232m @ 0.60g/t Au from 364m, including 1m @ 66.4g/t Au from 510m o Bull Oak infill drilling 9
▪ BORC26036: 7m @ 119g/t Au from 199m, including 1m @ 751g/t Au from 202m, the highest single assay Brightstar has intersected at Sandstone ▪ BORC26010: Broad, unconstrained 184m @ 1.00g/t Au from 135m, including 21m @ 3.83g/t Au from 262m ▪ BORC26029: 7m @ 12.2g/t Au from 87m, including 1m @ 82.7g/t Au from 87m o Havilah 9
▪ HVRC26013: 4m @ 11.1g/t Au from 6m, including 1m @ 37.1g/t Au from 8m ▪ HVRC26009: 12m @ 2.24g/t Au from 3m o Indomitable East 1
▪ INRC26043: 15m @ 3.41g/t Au from 90m, including 2m @ 12.5g/t Au from 90m ▪ INRC26019: 7m @ 6.18g/t Au from 22m, including 2m @ 16.8g/t Au from 24m ▪ INRC26032: 9m @ 4.07g/t Au from 22m o Lord Nelson 1
▪ LNDD26001: 2.65m @ 2.71g/t Au from 196m ▪ LNDD25002: 2.50m @ 2.09g/t Au from 150.4m o Lord Henry 1
▪ LHDD25002: 2m @ 5.25g/t Au from 80m ▪ LHDD25001: 0.9m @ 5.41g/t Au from 43.6m o Achilles 1
▪ ACRC26048: 9m @ 4.50g/t Au from 120m, including 1m @ 31.2g/t Au from 120m ▪ ACRC26044: 2m @ 29.5g/t Au from 148m, including 1m @ 49.0g/t Au from 148m ▪ ACDD26004: 9.5m @ 3.56g/t Au from 40.5m o Montague-Boulder 1
▪ MBDD26005: 2.2m @ 6.44g/t Au from 85.75m ▪ MBDD26004: 5.13m @ 2.39g/t Au from 97.19m o Whistler 1
▪ WHDD26002: 20.16m @ 1.64g/t Au from 103.84m
BRIGHTSTAR RESOURCES LIMITED 4 ACN 100 727 491 brightstarresources.com.au ASX: BTR ▪ WHDD26003: 9m @ 2.94g/t Au from 180m Goldfields Hub o Lord Byron 8
▪ LBRC26052: 8m @ 9.03g/t Au from 37m, including 4m @ 15.8g/t Au from 39m ▪ LBRC26054: 25m @ 3.14g/t Au from 142m ▪ LBRC26035: 28m @ 2.13g/t Au from 32m o Fish North 8
▪ FHRC26003: 1m @ 3.62g/t Au from 74m and 3m @ 1.24g/t Au from 96m ▪ FHRC26001: 2m @ 1.07g/t Au from 97m o Yunndaga 8
▪ YNDD25006: 8.6m @ 4.55g/t Au from 192.4m ▪ YNDD25007: 8.5m @ 3.13g/t Au from 231m ▪ YNDD25005: 5.7m @ 2.17g/t Au from 155.5m o Sandstone Pre-Feasibility Study (PFS) metallurgical testwork delivered average gold recoveries of 94% through a conventional gravity and CIL flowsheet, with no deleterious elements, preg- robbing or refractory characteristics identified o The Sandstone PFS, including a maiden Ore Reserve, remains on track for delivery in the December 2026 quarter o Post quarter-end, Brightstar reported the final assays from the Bull Oak infill drilling program, including 167m @ 2.07g/t Au from 104m (BORC26042), including 10m @ 25.0g/t Au from 120m, 124m @ 1.45g/t Au from 147m (BORC26045), 14.5m @ 10.8g/t Au from 300m, including 0.5m @ 265g/t Au (BODD26010), and 42m @ 2.91g/t Au from 280m (BORC26044), which ended in mineralisation and remains open at depth. The results will be incorporated into the next Bull Oak Mineral Resource update ahead of the Sandstone PFS o Post quarter-end, Brightstar reported assay results for TMHDD26003, the southernmost hole of the four-hole, ~3,800m Shirvington Zone program at Two Mile Hill. Within the host tonalite the hole produced a bulk intercept of 305m @ 1.33g/t Au from 584m, including 64.9m @ 1.47g/t Au from 585.1m, 28.0m @ 1.95g/t Au from 713.0m and 6.0m @ 11.2g/t Au from 765.0m. The 173m @ 1.42g/t Au from 716m interval sits beneath the current Mineral Resource, from ~620m to ~770m vertical depth. Assays are pending for the remaining three holes, and a multi-rig ~6,500m follow-up diamond drilling program commenced in late October 2026.
BRIGHTSTAR RESOURCES LIMITED 5 ACN 100 727 491 brightstarresources.com.au ASX: BTR OPERATIONS OVERVIEW Brightstar Resources Ltd (Brightstar or the Company) (ASX: BTR) is pleased to announce updates on its operational activities for the September 2026 quarter as outlined below. Production Summary
DecQ MarQ JunQ SepQ
2025 2026 2026 2026
Unit Total Total Total Total Mining operations Development ore: Ore mined kt 30.8 7.4 4.0 - Grade mined g/t Au 2.27 3.47 2.39 - Contained gold oz 2,246 820 309 - Stope ore: Ore mined kt 57.6 51.4 24.2 17.5 Grade mined g/t Au 3.03 3.29 3.19 3.41 Contained gold oz 5,600 5,431 2,486 1,923 Total ore mined: Ore mined kt 88.3 58.7 28.3 17.5 Grade mined g/t Au 2.76 3.31 3.07 3.41 Contained gold oz 7,846 6,250 i 2,794 i 1,923 ii
Metres advanced: Operating m 677 457 205 - Capital (drives) m 399 249 - - Capital (decline) m 304 186 - - Total metres m 1,380 892 205 - i. The Fish underground mine transitioned to interim care & maintenance in February 2026 as outlined in the DFS 2.0 mine plan and to coincide with the completion of the Genesis OPA, which contributed to reduced production during the March and June Quarters. ii. Underground mining at Second Fortune concluded in August 2026, with the mine transitioned into care and maintenance. SECOND FORTUNE MINING COMPLETED Underground mining at the Second Fortune mine concluded during the quarter in line with the DFS 2.0 life of mine plan, and the mine has been safely transitioned into C&M. Second Fortune operated for six years without a Lost Time Injury, a strong safety record for the Brightstar operations team. All ore mined at Second Fortune since April 2026 has been stockpiled for processing through Brightstar’s Laverton processing plant. At the conclusion of mining, the high-grade stockpiles at Second Fortune and Fish mines totalled approximately 62kt @ 3.1g/t Au for ~6.2koz, which will provide valuable ramp-up material following plant commissioning. FINANCIAL SUMMARY During the September quarter, the Company continued to incur expenditure on the development of the Goldfields Project in line with the project development plan outlined in the DFS 2.0, with construction of
BRIGHTSTAR RESOURCES LIMITED 6
ACN 100 727 491 brightstarresources.com.au ASX: BTR
the Laverton processing plant progressing under the EPC contract with GR Engineering Services Limited
(GRES).
A total of $35.4M of expenditure was incurred relating to the Laverton Mill construction during the
September 2026 quarter.
During the quarter, Brightstar incurred $5.3M of operating expenditure at the Second Fortune Mining
Operation (including mining costs of $2.6M and $2.7M of other site related expenditure) associated with
the completion of mining and the build-up of stockpiles to provide early feed for the Laverton Mill.
Following the completion of mining activities at Second Fortune during the quarter, care and
maintenance expenses of $1.1M were incurred.
At the Fish operation, care and maintenance costs of $0.8M were incurred as well as capital expenditure
of $1.6M associated with underground diamond drilling activities to support the Stage 2 mine plan.
The Company incurred exploration and studies expenditure of $12.5M, corporate expenditure of $3.0M
and $1.8M of non-process infrastructure capital expenditure for the September 2026 quarter.
MINING & DEVELOPMENT OPERATIONS OVERVIEW
SECOND FORTUNE UNDERGROUND MINE
During the September quarter, Second Fortune mined a total of 17.5kt @ 3.41g/t Au for 1,923oz,
comprising only stope ore.
Mining concluded in August 2026, in line with the DFS 2.0 life of mine plan. The resulting high-grade
stockpiles of approximately 62kt @ 3.1g/t Au for ~6.2koz (combined Second Fortune and Fish stockpiles)
will be hauled to the Laverton processing plant to provide ramp-up feed following commissioning in mid-
CY27.
FISH UNDERGROUND MINE
The Fish mine remains in C&M in accordance with the DFS 2.0 plan, ahead of the targeted re-start of
underground mining operations in 1H CY27. The underground diamond drilling program designed to
improve grade control data for the Stage 2 mine plan and test for extensions at depth commenced in the
first week of July 2026 and concluded in the September quarter. Technical workstreams relating to the
Stage 2 mine plan commenced in September.
LORD BYRON OPEN PIT
Post quarter-end, in the construction update released on 13 October 2026, Brightstar reported that site
establishment had commenced at the Lord Byron open pit, with mining development activities underway
to prepare the site for the non-process infrastructure, site offices and facilities for the open pit operations
team ahead of mining mobilisation targeted for early MarQ’27. Mobilisation of the Lord Byron tech team
commenced in September, ahead of site works at the open pit.
Site establishment progress is shown in Figure 1.
Lord Byron and Fish are located ~55km from the Laverton processing plant site.
BRIGHTSTAR RESOURCES LIMITED 7 ACN 100 727 491 brightstarresources.com.au ASX: BTR
Figure 1: Lord Byron open pit, site establishment underway (L); existing pit, site establishment works and access roads (R)
GOLDFIELDS DEVELOPMENT OVERVIEW
Construction of the 1.5Mtpa Laverton processing plant advanced strongly through the September
quarter.
The Goldfields Project remains on schedule for first gold in June 2027 and is tracking within the
approved budget.
The Goldfields Project is expected to deliver average gold production of approximately 75koz p.a. over
an initial six-year mine life, with strong potential for mine life extensions across the broader Goldfields
portfolio.
Future cash flows from production at the Goldfields Project are intended to provide material funding to
unlock the value of and support the development of the Company’s flagship Sandstone Project.
Figure 2: Laverton processing plant site (September 2026)
BRIGHTSTAR RESOURCES LIMITED 8 ACN 100 727 491 brightstarresources.com.au ASX: BTR The major construction and development activities advanced at the Goldfields Project during the September quarter include: • Bulk earthworks for the process plant infrastructure completed in July, followed by completion of the bulk earthworks for the raw and process water ponds in August, with the Non-Process Infrastructure (NPI) and ROM pad extension, perimeter access road, drain and flood bund progressing; • Concrete works for the CIL tank ring beams, slab and containment walls completed, enabling the CIL tank platework installation team to commence on site ahead of schedule; • Primary crusher walls first lift and suspended floor poured, SAG mill plinths poured and thickener foundations and pedestals completed and backfilled, with surge bin, gold recovery and elution foundations progressing; • Structural steel and platework for the primary crushing area commenced, with fabrication packages progressing; • Delivery of the first mechanical equipment to site, being the vibrating screen; and • Borefield development, with production bores drilled and cased, the pipe corridor cleared, carrier pipework welding commenced and main header pipework delivered to site.
Figure 3: Construction activities underway (August 2026) Top: Primary crusher (L); grinding and classification area with major concrete foundations complete (R) Bottom: CIL circuit with major concrete works complete and tank construction commenced (L); surge bin and wall foundations (R)
BRIGHTSTAR RESOURCES LIMITED 9 ACN 100 727 491 brightstarresources.com.au ASX: BTR Post quarter-end, in the construction update released on 13 October 2026, Brightstar reported that construction activities on site continued to advance strongly through September. The major project and construction development activities that have advanced in September include: • Final major concrete pour for the primary crusher area completed. • LNG power station detailed earthworks and civil concrete works commenced. • Gold recovery and elution area civil works continuing, with reagents area civil works commenced. • CIL tank platework and strake welding commenced. • Surge bin area concrete complete and structural steel erection commenced. • Borefields development drilling and main header pipework welding advancing. • Structural steel and platework fabrication packages progressing with ongoing deliveries to site. Brightstar continues to assess opportunities to enhance and de-risk the Goldfields Project through both organic and inorganic initiatives, with parallel work ongoing on mine-life extension opportunities and the 2.5Mtpa throughput upside scenario.
Figure 4: Construction activities underway (September 2026, reported post quarter-end) Top: Primary crusher, final pour completed (L); CIL circuit, tank construction underway (R) Bottom: Surge bin area, structural steel erection commenced (L); power station area, concrete commenced (R)
BRIGHTSTAR RESOURCES LIMITED 10 ACN 100 727 491 brightstarresources.com.au ASX: BTR POWER CONTRACTS In July 2026, Brightstar executed an integrated energy solution for the Laverton mill, comprising a long- term Power Purchase Agreement with PWR Hybrid Solutions and a dedicated LNG Supply Agreement with EVOL LNG, both portfolio companies of OCTA Group. Engineering of the power station and LNG infrastructure progressed during the quarter with major long-lead equipment secured. Post quarter-end, Brightstar reported that LNG power station detailed earthworks and civil concrete works commenced in September.
Figure 5: Project Execution Schedule (as reported post quarter-end, 13 October 2026)
OPERATIONAL READINESS
Brightstar’s Operational Readiness program advanced in parallel with construction during the quarter.
The program prepares the owner’s team to take the Laverton processing plant through commissioning
and into steady-state operation ahead of first gold in the June 2027 quarter.
During the quarter Brightstar appointed an experienced Processing Manager and an Ops Readiness Lead
with recruitment of the broader operations team progressing in line with the schedule.
STRATEGIC LAVERTON TENEMENT ACQUISITION
On 15 September 2026, Brightstar entered into a binding Tenement Sale Agreement (TSA) with Panther
Metals Limited (ASX: PNT) (Panther) to acquire 100% of Panther’s right, title and interest in the five
exploration licences comprising the Mikado Project, being E38/3526, E38/3527, E38/3574, E38/3912 and
E38/3954 (Mikado Tenements), together with the related mining information, the benefit of third-party
agreements and associated assets.
The consideration payable under the TSA is $350,000 in cash, funded from Brightstar’s existing cash
reserves, and the TSA is not subject to any financing condition. Panther has consented to Brightstar
accessing the Mikado Tenements consistent with the parties’ existing access arrangements, enabling haul
road construction and related infrastructure works to commence ahead of registration of the tenement
transfers.
BRIGHTSTAR RESOURCES LIMITED 11 ACN 100 727 491 brightstarresources.com.au ASX: BTR The Mikado Tenements are immediately adjacent to the 1.5Mtpa Laverton processing plant and provide: • the underlying tenure required for a new, short haul road connecting the Fish underground and Lord Byron open pit operations to the plant, reducing haulage costs across the Laverton Hub
28 October 2026
DEEP EXTENSIONAL DRILLING COMMENCED AT
TWO MILE HILL
First of two rigs on site for a seven-hole, ~6,500m program beneath the
1.45Moz @ 1.8g/t Au Two Mile Hill-Shillington Mineral Resource
• Deep drilling has commenced at the Two Mile Hill-Shillington deposit, part of the 3.6Moz @ 1.4g/t
Au Sandstone Gold Project
1
, with a second rig to arrive in the coming days
• Seven-hole, ~6,500m program designed to extend the Shirvington Zone along strike and at depth,
beneath the current MRE of 24.6Mt @ 1.8g/t Au for 1.45Moz Au
1
• Follows 305m @ 1.33g/t Au from 584m in TMHDD26003, which included 173m @ 1.42g/t Au beneath the current Mineral Resource • Holes are planned south of TMHDD26003 and targeting the undefined western contact of the tonalite, which is now >400m wide and open at depth 3
• Assays for TMHDD26004, TMHDD26005 and TMHDD26006 due in November 3
• All results to feed an updated Two Mile Hill Mineral Resource this quarter, with the Sandstone
PFS due this quarter
Brightstar Resources Limited (ASX: BTR) (Brightstar or the Company) is pleased to advise that the next
phase of extensional diamond drilling has commenced at the Two Mile Hill-Shillington deposit, part of the
3.6Moz @ 1.4g/t Au Sandstone Gold Project. The first of two diamond drilling rigs is now on site to complete
a ~6,500m deep diamond drilling program, with the second rig due to arrive in the coming days.
The program targets the Shirvington Zone, a widened, mineralised tonalite beneath the current Mineral
Resource first intersected by TMHRCD26020 (305.4m @ 1.82g/t Au)
5
and confirmed at depth by
TMHDD26003 (305m @ 1.33g/t Au from 584m)
2
.
Brightstar’s Managing Director, Alex Rovira, commented:
“Two Mile Hill has the potential to support a large-scale, bulk underground mining operation that underpins a
long-life Sandstone development scenario. The September Mineral Resource showed contained ounces per
vertical metre increasing materially as a result of the breadth of the Shirvington Zone at depth. The first deep
hole confirmed the tonalite stays mineralised below the Mineral Resource at grades consistent with the model.
This program is designed to test continuity and define the edges of the host tonalite at depth.
The 6,500m program with two rigs reflects our confidence in the geology. The holes have been planned to extend
the Shirvington Zone to the south, north and at depth, and to delineate down the western contact of the tonalite,
which the previous program failed to reach despite the holes being extended beyond target depth.
With assays for the three previous deep holes still pending, the Sandstone Pre-Feasibility Study due this quarter
and the exploration rigs now turning, the Sandstone Gold Project will continue to deliver consistent value-
creating catalysts over the coming months.”
2
Figure 1: Plan view of the Two Mile Hill-Shillington deposit showing planned drillhole collars TECHNICAL DISCUSSION TWO MILE HILL-SHILLINGTON DEPOSIT The combined Two Mile Hill-Shillington deposit hosts a current Mineral Resource Estimate (MRE) of 24.6Mt @ 1.8g/t Au for 1.45Moz 1 . The local geology consists of a tonalite intrusive stock intruded into a northeast- dipping package of basalt and banded iron formation (BIF). Gold mineralisation is predominantly hosted in the tonalite (e.g. 61.6m @ 1.81g/t Au in SN_TM_RD_22_0004, Figure 2), although significant mineralisation is also found in the neighbouring basalt and BIF (e.g. 14.7m @ 24.3g/t Au from 250m in TRCD733, Figure 2). The Shirvington Zone is a significant widening of the host tonalite at depth, first highlighted by TMHRCD26020, which returned a bulk, unconstrained intercept of 305.4m @ 1.82g/t Au from 351.9m and ended in mineralised tonalite 5 .
3
The four-hole, ~3,800m deep diamond program completed in September 2026 extended the known width of
the tonalite to >400m, with all four holes ending in tonalite without reaching the western contact
3
.
TMHDD26003, the southernmost hole, returned 305m @ 1.33g/t Au from 584m, including 173m @ 1.42g/t
Au from 716m beneath the current MRE
2
.
The 173m extensional interval sits below the depth at which contained ounces in the September 2026 MRE
peak (~5,900oz per vertical metre, approximately 595m below surface)
1
, demonstrating that the mineralised
tonalite continues beneath the current MRE and remains open at depth.
Assays for TMHDD26004, TMHDD26005 and TMHDD26006 are pending.
FOLLOW-UP DRILLING PROGRAM
The follow-up program comprises seven deep diamond drillholes for ~6,500m, including one re-entry, to be
drilled by two diamond rigs. The program has been designed to:
▪ Extend the Shirvington Zone along strike to the south of TMHDD26003, the southernmost hole
drilled to date (Figure 3);
▪ Test the continuity of mineralisation at depth beneath the current MRE, where TMHDD26003
intersected 173m @ 1.42g/t Au (Figure 2);
▪ Re-enter and extend TMHRCD26020 to test for further mineralisation and intersect the
eastern contact
▪ Define the western contact of the tonalite, which was not reached by the previous program,
to constrain the full width of the host unit; and
▪ Provide the geological, structural and grade-continuity data needed for the next update of the
Two Mile Hill Mineral Resource and future mine planning activities.
The first drill rig has now mobilised to site and commenced drilling. The second rig is due on site within a
week. Results will be reported as assays are received and, together with the pending assays from
TMHDD26004 to TMHDD26006, incorporated into an updated Mineral Resource for Two Mile Hill.
4
Figure 2: Cross-section A-A’ through the Two Mile Hill deposit showing planned drillholes in relation to recent drilling and the current MRE
5
Figure 3: Cross-section B-B’ through the Two Mile Hill deposit showing planned drillholes in relation to the current MRE The shape of the Two Mile Hill tonalite at depth reflects the extensional, southerly plunging aspect of the Shirvington Zone.
6 Table 1: Two Mile Hill deep diamond drillhole collar information for completed drilling. All holes are located on tenement M57/128. Grid coordinates shown in MGA94 Zone 50. Hole ID Hole Type Easting Northing RL Dip Azimuth Hole Depth (m) Status TMHDD26003 DD 723362 6892451 519 -60 270 1039.2 Reported 22 October 2026 TMHDD26004 DD 723353 6892546 519 -60 265 888.3 Assays pending TMHDD26005 DD 723362 6892592 522 -60 267 901.4 Assays pending TMHDD26006 DD 723436 6892529 519 -64 268 1010.9 Assays pending
Table 2: Two Mile Hill planned diamond drillhole collar information. All planned holes are located on tenement M57/128. Grid
coordinates shown in MGA94 Zone 50.
Planned Hole ID Hole Type Easting Northing RL Dip Azimuth Hole Depth (m) Status
TMH_26PLAN_033 DD 723368 6892371 514 -60 270 1050 Planned drill hole
TMH_26PLAN_034 DD 723479 6892377 513 -60 267 1100 Planned drill hole
TMH_26PLAN_035 DD 723470 6892567 520 -60 267 1100 Planned drill hole
TMH_26PLAN_036 DD 723480 6892665 520 -65 267 1000 Planned drill hole
TMH_26PLAN_037 DD 722623 6892427 515 -65 90 1000 Planned drill hole
TMH_26PLAN_038 DD 722606 6892556 520 -65 90 1000 Planned drill hole
TMHRCD26020
DD
(re-entry)
722939 6892469 513 -73 86
907
(250m extension)
Planned drill hole
This ASX announcement has been approved by the Managing Director on behalf of the Board of Brightstar.
27 October 2026 STRATEGIC $82M PLACEMENT TO ACCELERATE SANDSTONE EXPLORATION AND DEVELOPMENT GENESIS MINERALS MAKES $30M STRATEGIC INVESTMENT IN BRIGHTSTAR GOLDFIELDS PROJECT CONSTRUCTION REMAINS ON SCHEDULE AND ON BUDGET Not for release to US wire services or distribution in the United States HIGHLIGHTS • Binding commitments received to raise A$82 million via a single-tranche bought deal placement to tier-1 institutional and strategic investors • Genesis Minerals Limited (ASX: GMD) has subscribed for A$30 million of the Placement and will emerge as a strategic shareholder with a 5.4% interest in Brightstar • Proceeds will fund an accelerated work program at the Sandstone Gold Project following the step change in scale at Two Mile Hill after the recent Shirvington Zone discovery and the doubling of the Two Mile Hill-Shillington Mineral Resource to 1.45Moz @ 1.8g/t Au 1
• Accelerated work program at Sandstone to comprise:
o Infill and extensional drilling at Two Mile Hill to enable the deposit to become a
cornerstone asset of future Sandstone production
▪ A multi-rig, ~6,500m diamond drilling exploration program testing
extensions to the large scale Shirvington Zone has commenced this week
o Workstreams to advance an early mining strategy at Two Mile Hill – including fast-
tracked development of an underground exploration decline to accelerate the drill
out of Two Mile Hill
o Drill testing of multiple nearby Two Mile Hill analogue targets
o Associated mine infrastructure and camp to support future project and mine
construction activities at Sandstone
• The Sandstone Pre-Feasibility Study (PFS) is targeted to be released this quarter, followed
by an immediate transition into a Definitive Feasibility Study (DFS)
• Construction of the Goldfields Project remains on schedule and on budget for first gold in
JunQ’27, fully funded by the February 2026 equity raising and the US$120 million senior
secured Bond
2
• All commercial conditions precedent to be provided by Brightstar under the Bond have now been approved by the Nordic Trustee, and all documentary conditions precedent have been agreed and are ready for execution
2
PLACEMENT OVERVIEW
Brightstar Resources Limited (Brightstar or the Company) (ASX: BTR) has received binding commitments
from institutional and strategic investors to raise A$82 million of new equity (before costs) via a single-
tranche placement (Placement) of 164 million new fully paid ordinary shares in the Company (New
Shares) at an issue price of A$0.50 per New Share (Offer Price). The Placement was cornerstoned with a
strategic investment by Genesis Minerals Limited (Genesis) for a total of A$30 million.
Brightstar’s Managing Director, Alex Rovira, commented:
“Recent drilling results at Two Mile Hill and progress on the Pre-Feasibility have materially changed the scale of
Sandstone. In the space of three months, we have doubled the Two Mile Hill-Shillington Mineral Resource to
1.45Moz, and the deeper Shirvington Zone drilling results demonstrate potentially material upside to the current
Mineral Resource estimate.
The true size of Sandstone is quickly emerging, which now warrants a faster and larger work program
than we scoped at the start of the year.
This capital raising allows us to fast-track the exploration workstreams to define and enhance what an
enlarged Sandstone development will look like. The Placement funds increased infill and extensional drilling at
Two Mile Hill as well as additional drill testing of the multiple Two Mile Hill analogue targets.
Importantly, the capital raising provides the funding to accelerate mine establishment at Two Mile Hill, with
Brightstar seeking to execute an ‘early mining’ strategy with the development of the necessary infrastructure and
mine camp needed to develop a cutback to the existing pit, followed by an underground exploration decline.
We are delighted to welcome Genesis Minerals as a strategic shareholder. Genesis is a highly regarded ASX100
Western Australian gold producer with a strategic focus on the Leonora-Laverton District, and its investment is a
strong endorsement of the quality of our portfolio and our team.
Importantly, development of the Goldfields Project continues apace. Construction remains on schedule for first
gold in the June quarter of 2027 and on budget, and the project remains fully funded through the February
2026 equity raising and the Bond. This Placement is dedicated to accelerating Sandstone and brings forward the
next leg of growth towards our TARGET200 ambition.”
STRATEGIC RATIONALE: ACCELERATE SANDSTONE EXPLORATION & DEVELOPMENT
The Placement is a strategic capital raising to accelerate the Sandstone Gold Project in response to the
scale of the results delivered at Two Mile Hill in recent months.
When the Company completed its A$193 million capital raising in February and March 2026
2
, the
Sandstone work programs were scoped to deliver a Pre-Feasibility Study and Definitive Feasibility Study
primarily focused on the open pit deposits, with Two Mile Hill-Shillington hosting a previous Mineral
Resource of 731koz Au (now doubled to 1.45Moz Au).
The results delivered by the recent exploration program since then have fundamentally changed the
scale of the opportunity, with Two Mile Hill rapidly emerging as the cornerstone asset in Sandstone
with meaningful potential to be a long-life underground mine to complement the proposed open pit
developments.
3 These recent achievements and developments include: • Deep drilling at Two Mile Hill-Shillington returned 305.4m @ 1.82g/t Au, with follow-up diamond drilling identifying the Shirvington Zone - a depth extension of the mineralised tonalite more than 300m wide at approximately 700m below surface 3
4
;
• Infill drilling above the Shirvington Zone returned 225.7m @ 3.11g/t Au from 284m
5
;
• The Two Mile Hill-Shillington Mineral Resource Estimate doubled to 1.45Moz @ 1.8g/t Au, with
Indicated Mineral Resources up 177% to 526koz, lifting the Sandstone Project Mineral Resource
to 3.6Moz. The updated estimate does not yet incorporate the deeper Shirvington Zone
drilling
1
; and
• The first assays from the deep diamond program returned 305m @ 1.33g/t Au from 584m in
TMHDD26003, materially extending Two Mile Hill below the current Mineral Resource, with a
multi-rig, ~6,500m follow-up diamond drilling program at Two Mile Hill underway
6
.
The Placement proceeds allow Brightstar to pursue this opportunity at pace with the accelerated program
comprising:
• Infill drilling at the enlarged Two Mile Hill to support the underground mining study and
further conversion of the Mineral Resource Estimate ahead of the Definitive Feasibility Study;
• Extensional drilling at the Shirvington Zone, expanding the ~6,500m follow-up program that
commenced this week, to define the extent of the tonalite at depth and deliver further Mineral
Resource Estimate updates;
• Drill testing of the multiple, nearby Two Mile Hill analogue targets identified within the
Sandstone tenure;
• Enlarged and accelerated Definitive Feasibility Study drilling across the Sandstone tenure
package;
• Immediate progression to a Definitive Feasibility Study to encapsulate a more
comprehensive underground mining study of Two Mile Hill being advanced with Entech;
• Infrastructure and mining establishment, together with the development of a Sandstone
camp, to support the underground development of an exploration decline to de-risk the
expanded drilling programs at Two Mile Hill and fast-track future mining operations at
Sandstone; and
• General working capital.
GOLDFIELDS PROJECT: ON SCHEDULE AND ON BUDGET
Construction of the Goldfields Project remains on budget and on schedule for first gold in JunQ’27
7
. The
Laverton processing plant, being delivered by GR Engineering Services under an EPC contract, is currently
~47% complete.
The Goldfields Project is fully funded by the proceeds of the Company’s February 2026 equity raising and
the US$120 million 12.5% senior secured bonds completed in March 2026 (Bond).
4
All commercial conditions precedent to be provided by Brightstar under the Bond have now been
approved by the Nordic Trustee, and all documentary conditions precedent have been agreed and are
ready for execution.
Goldfields construction expenditure to date has been funded from the Company’s existing cash reserves
in accordance with the Company’s funding plan, with the release of Bond proceeds from escrow to follow
as construction expenditure increases through the peak of the plant build. The Bond proceeds are
dedicated to the Goldfields Project and are not available to fund Sandstone. The Placement therefore
provides funding for the accelerated and expanded Sandstone program and does not alter the Goldfields
funding package.
GENESIS MINERALS STRATEGIC INVESTMENT
Genesis has subscribed for 60.0 million New Shares under the Placement for a total consideration of
A$30.0 million, on the same terms as all other participants in the Placement. On completion of the
Placement, Genesis will hold approximately 5.4% of Brightstar’s ordinary shares on issue, up from 0.8%
prior to the Placement.
Genesis is a growing Western Australian gold producer with a strategic focus on the Leonora-Laverton
District, which also hosts Brightstar’s Goldfields Project.
PLACEMENT DETAILS
Brightstar has received binding commitments from institutional and strategic investors to raise A$82
million of new equity (before costs) via a single tranche placement of 164 million new fully paid ordinary
shares in the Company at an issue price of A$0.50 per New Share.
The Offer Price represents a 12% discount to the last closing price of A$0.565 on 22 October 2026 and a
19% discount to the 30-day volume weighted average price of A$0.62 per share.
The Placement was a bought deal of highly targeted, long-term investors, with Genesis subscribing for
A$30 million as a cornerstone investor. The balance of the Placement was subscribed for by Tier 1, global
institutional investors.
The New Shares will be issued under the Company’s existing placement capacity pursuant to ASX Listing
Rule 7.1 and the Placement is not subject to shareholder approval. The New Shares will rank equally with
the Company’s existing shares on issue.
Settlement of the Placement is expected to occur on 2 November 2026, with allotment and
commencement of trading of the New Shares on 3 November 2026.
Canaccord Genuity (Australia) Limited acted as Global Coordinator and Sole Bookrunner to the Placement.
Canaccord, Argonaut Securities Pty Ltd and Euroz Hartleys Limited acted as Joint Lead Managers to the
Placement. Shaw and Partners Limited acted as Co-Manager.
This ASX announcement has been approved by the Managing Director on behalf of the Board of Brightstar.
5
Appendix 3B - Proposed issue of securities 1 / 5 Announcement Summary Entity name BRIGHTSTAR RESOURCES LIMITED Announcement Type New announcement Date of this announcement 27/10/2026 The Proposed issue is: Total number of +securities proposed to be issued for a placement or other type of issue ASX +security code+Security description Maximum Number of +securities to be issued BTRORDINARY FULLY PAID164,000,000 Proposed +issue date 3/11/2026 Refer to next page for full details of the announcement A placement or other type of issue
Appendix 3B - Proposed issue of securities Appendix 3B - Proposed issue of securities 2 / 5 Part 1 - Entity and announcement details 1.1 Name of +Entity BRIGHTSTAR RESOURCES LIMITED We (the entity named above) give ASX the following information about a proposed issue of +securities and, if ASX agrees to +quote any of the +securities (including any rights) on a +deferred settlement basis, we agree to the matters set out in Appendix 3B of the ASX Listing Rules. If the +securities are being offered under a +disclosure document or +PDS and are intended to be quoted on ASX, we also apply for quotation of all of the +securities that may be issued under the +disclosure document or +PDS on the terms set out in Appendix 2A of the ASX Listing Rules (on the understanding that once the final number of +securities issued under the +disclosure document or +PDS is known, in accordance with Listing Rule 3.10.3C, we will complete and lodge with ASX an Appendix 2A online form notifying ASX of their issue and applying for their quotation). 1.2 Registered Number Type ACN Registration Number 100727491 1.3 ASX issuer code BTR 1.4 The announcement is 1.5 Date of this announcement 27/10/2026 1.6 The Proposed issue is: A placement or other type of issue New announcement
Appendix 3B - Proposed issue of securities Appendix 3B - Proposed issue of securities 3 / 5 Part 7 - Details of proposed placement or other issue Part 7A - Conditions 7A.1 Do any external approvals need to be obtained or other conditions satisfied before the placement or other type of issue can proceed on an unconditional basis? Part 7B - Issue details Is the proposed security a 'New class' (+securities in a class that is not yet quoted or recorded by ASX) or an 'Existing class' (additional securities in a class that is already quoted or recorded by ASX)? Will the proposed issue of this +security include an offer of attaching +securities? Details of +securities proposed to be issued ASX +security code and description BTR : ORDINARY FULLY PAID Number of +securities proposed to be issued 164,000,000 Offer price details Are the +securities proposed to be issued being issued for a cash consideration? In what currency is the cash consideration being paid? AUD - Australian Dollar What is the issue price per +security? AUD 0.50000 Will these +securities rank equally in all respects from their issue date with the existing issued +securities in that class? Yes Yes No Existing class No
Appendix 3B - Proposed issue of securities Appendix 3B - Proposed issue of securities 4 / 5 Part 7C - Timetable 7C.1 Proposed +issue date 3/11/2026 Part 7D - Listing Rule requirements 7D.1 Has the entity obtained, or is it obtaining, +security holder approval for the entire issue under listing rule 7.1? 7D.1b Are any of the +securities proposed to be issued without +security holder approval using the entity's 15% placement capacity under listing rule 7.1? 7D.1b ( i ) How many +securities are proposed to be issued without security holder approval using the entity's 15% placement capacity under listing rule 7.1? The Company will be issuing a total of 164,000,000 fully-paid ordinary shares out of its existing capacity. 7D.1c Are any of the +securities proposed to be issued without +security holder approval using the entity's additional 10% placement capacity under listing rule 7.1A (if applicable)? 7D.2 Is a party referred to in listing rule 10.11 participating in the proposed issue? 7D.3 Will any of the +securities to be issued be +restricted securities for the purposes of the listing rules? 7D.4 Will any of the +securities to be issued be subject to +voluntary escrow? Part 7E - Fees and expenses 7E.1 Will there be a lead manager or broker to the proposed issue? 7E.1a Who is the lead manager/broker? The placement was managed by the Joint Lead Manager's (Canaccord Genuity (Australia) Limited, Euroz Hartleys Limited, Arognaut Securities Pty Limited), together the JLM's. 7E.1b What fee, commission or other consideration is payable to them for acting as lead manager/broker? JLM's will receive the following fees for the capital raising:
- management fee of 0.5% of the gross proceeds raised in the placement
- selling fee of 4.5% of the gross proceeds (excluding proceeds from Genesis Minerals Limited's cornerstone allocation) 7E.2 Is the proposed issue to be underwritten? 7E.4 Details of any other material fees or costs to be incurred by the entity in connection with the proposed issue No Yes No No No No Yes No
Appendix 3B - Proposed issue of securities Appendix 3B - Proposed issue of securities 5 / 5 Part 7F - Further Information 7F.01 The purpose(s) for which the entity is issuing the securities The Company is raising funds to accelerate exploration programs at Sandstone, advance potential early mining strategies at Two Mile Hill to fast-track and de-risk development, and general working capital. 7F.1 Will the entity be changing its dividend/distribution policy if the proposed issue proceeds? 7F.2 Any other information the entity wishes to provide about the proposed issue 7F.3 Any on-sale of the +securities proposed to be issued within 12 months of their date of issue will comply with the secondary sale provisions in sections 707(3) and 1012C(6) of the Corporations Act by virtue of: The publication of a cleansing notice under section 708A(5), 708AA(2)(f), 1012DA(5) or 1012DAA(2)(f) No The publication of a cleansing notice under section 708A(5), 708AA(2)(f), 1012DA(5) or 1012DAA(2)(f) No
27 October 2026 Lion invests $1.0M in Brightstar Resources
Lion Selection Group Limited (ASX:LSX, Lion) is pleased to announce it has committed to invest $1.0M as part of a $82M placement announced by Brightstar Resources (ASX:BTR, Brightstar).
Brightstar is developing a new gold processing facility Southeast of Laverton, WA to be fed by ore sourced from nearby open pit and underground mines in the Laverton and Menzies regions. First production is expected in June 2027 1 .
Whilst project development is underway at Laverton, Brightstar have been drilling to infill and extend Resources at their flagship Sandstone Project in advance of a Pre-Feasibility Study. Drilling at the Two Mile Hill deposit has intersected much thicker, and higher-grade zones of gold mineralisation beneath the known deposit. The discovery hole for this expanded zone returned 305.4m at 1.82g/t gold (from 351.9m) 2 . Two Mile already is the largest individual Mineral Resource in the Sandstone field 3 and with intercepts that extend well beyond the Resource, it is expected to grow further 4 .
The large-scale and mostly shallow Mineral Resources at Sandstone have enabled Brightstar to aspire for a gold production profile of + 200koz per annum by 2029.
The geological significance of this discovery has been to highlight the scale potential for gold mineralised intrusive plugs within the Sandstone field. Two Mile Hill has a similar geological setting to Bull Oak, where Brightstar drilling has recently returned intercepts such as 167m at 2.07g/t gold (from 104m) 5 . Brightstar notes the scale potential for this style of deposits, with analogies such as Thunderbox, Gruyere, Kanowna Belle, and King of the Hills which are all significant sized gold deposits being operated at large scale in Western Australia that are hosted in similar felsic intrusive bodies 6 .
This fund raising will enable Brightstar to take a more aggressive approach at Sandstone to extension and infill drilling of these large-scale systems, which offer potentially large-scale inventories that now need to be drilled rapidly to enable inclusion in forthcoming project studies.
Lion has already invested $10.6M in Brightstar (which includes $1M which Lion had invested in Alto Metals and accepted Brightstar shares in a merger of the companies in December 2024) which is Lion’s second largest investment. Following successful completion of the fund raising, which is being conducted at 50¢ps, Lion’s interest in Brightstar will be approximately 2.3%.
Lion Managing Director Hedley Widdup said: “The investment case for Lion to increase its investment in Brightstar is simple. Sandstone is already a project that could support a large-scale, long-life potential gold operation, and in our view the discovery of large-scale mineralisation at Two Mile Hill has the potential to have significant positive impact on the economics of the Sandstone project.”
ASX Release – 27 October 2026 Page 2 of 2
1 Brightstar reaffirmed its plans for first gold from the Laverton plant in June 2027 in a release to ASX dated 13 October 2026 Goldfields Project Construction Update 2 Brightstar reported the first of the long drill intercepts into Two Mile in a release to ASX on 3 August 2026 Spectacular 305.4m @ 1.82g/t Au Intercept from Sandstone Extensional Drilling 3 Brightstar fully described a Mineral Resource Estimate for Two Mile Hill in a released to ASX dated 28 September 2026. This showed the total estimated Mineral Resource at Two Mile Hill / Shillington (1.446Moz) accounts for 40% of the total Sandstone estimate (3.583Moz) 4 Brightstar has released results from drilling extensions to Two Mile Hill to ASX during 2026 on 25 August, 7 September, 30 September, and 22 October. 5 Brightstar described the results of deep drilling at Bull Oak in a release to ASX on 5 October 2026 167m at 2g/t Au Extends Bull Oak Mineralisation at Sandstone 6 Discussion of the geological style of Two Mile Hill was contained in Brightstar’s announcement referenced in footnote 2.
Market Announcement 23/10/2026 BRIGHTSTAR RESOURCES LIMITED Security Code: BTR Pause in Trading Trading in the securities of the entity will be temporarily paused pending a further announcement.
ASX Supervision 23/10/2026Market Announcement 1/1
Market Announcement
23 October 2026 23 October 2026 87 10.0 Market Announcement 1/1 ASX Limited ASX Customer Service Centre 131 279 | asx.com.au
Brightstar Resources Limited (ASX: BTR) – Trading
Halt
Trading in the securities of Brightstar Resources Limited (‘BTR’) will be halted at the request of BTR,
pending the release of an announcement by BTR.
Unless ASX decides otherwise, the securities will remain in trading halt until the earlier of:
• the commencement of normal trading on Tuesday, 27 October 2026; or
• the release of the announcement to the market.
BTR’s request for a trading halt is attached below for the information of the market.
Issued by ASX Supervision
23 October 2026
Australian Securities Exchange
Level 40, Central Park
152 – 158 St Georges Terrace
PERTH WA 6000
Trading halt request – Brightstar Resources Limited
Brightstar Resources Limited (ASX: BTR) (the Company) requests that a trading halt be granted by ASX from the commencement of trading today, Friday 23 October 2026.
The Company provides the following information in relation to the request in accordance with ASX Listing Rule 17.1:
- The trading halt is requested for a potential capital raising by The Company.
- The Company requests that the trading halt remain in place until the earlier of the commencement of trading on Tuesday, 27 October 2026 or the release of an announcement by the Company regarding firm commitments for the capital raising.
- The Company is seeking the trading halt to assist in managing its disclosure obligations and to maintain an orderly market in relation to the capital raising.
- The Company confirms that it is not aware of any reason why the trading halt should not be granted or any other information necessary to inform the market about the trading halt.
Authorised by, and for further information please contact:
Alex Rovira
Managing Director
Brightstar Resources Limited
Notice of Annual General Meeting (Brightstar Resources Limited)
Brightstar Resources Limited
ACN 100 727 491
Notice of Annual General Meeting
The Annual General Meeting of the Company will be held as follows:
Time and date: 10:00am (AWST) on Tuesday, 24 November 2026 Location: The Forrest Centre, Suite 2, Level 14, 221 St Georges Terrace, Perth WA 6000
The Notice of Annual General Meeting should be read in its entirety. If Shareholders are in doubt as to how to vote, they should seek advice from their accountant, solicitor or other professional advisor prior to voting. Should you wish to discuss any matter, please do not hesitate to contact the Company on +61 8 9277 6008 or [email protected].
Shareholders are urged to attend or vote by lodging the Proxy Form.
Notice of Annual General Meeting (Brightstar Resources Limited) Page 1
Brightstar Resources Limited
ACN 100 727 491
(Company)
Notice of Annual General Meeting
Notice is hereby given that the Annual General Meeting of Shareholders of Brightstar Resources Limited
(Company) will be held at The Forrest Centre, Suite 2, Level 14, 221 St Georges Terrace, Perth WA 6000
on Tuesday, 24 November 2026 at 10:00am (AWST) (Meeting).
The Explanatory Memorandum provides additional information on matters to be considered at the
Meeting. The Explanatory Memorandum and the Proxy Form form part of the Notice.
The Directors have determined pursuant to regulation 7.11.37 of the Corporations Regulations 2001
(Cth) that the persons eligible to vote at the Meeting are those who are registered as Shareholders on
Sunday, 22 November 2026 at 10:00am (AWST).
Terms and abbreviations used in the Notice are defined in Schedule 1.
Agenda
- Annual Report To consider the Annual Report of the Company and its controlled entities for the financial year ended 30 June 2026, which includes the Financial Report, the Directors’ Report and the Auditor’s Report. Note: There is no requirement for Shareholders to approve the Annual Report.
- Resolutions Resolution 1 – Remuneration Report To consider and, if thought fit, to pass with or without amendment, as a non-binding ordinary resolution the following: ‘That, the Remuneration Report be adopted by Shareholders, on the terms and conditions in the Explanatory Memorandum.’ Note: A vote on this Resolution is advisory only and does not bind the Directors or the Company. Resolution 2 – Re-election of Director – Mr Richard Crookes To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following: ‘That, for the purposes of clause 14.2 of the Constitution, Listing Rule 14.5 and for all other purposes, Mr Richard Crookes retires by rotation and, being eligible and offering himself for re- election, is re-elected as a Director of the Company, on the terms and conditions in the Explanatory Memorandum.’
Notice of Annual General Meeting (Brightstar Resources Limited) Page 2
3444-2809-0449, v. 3
Resolution 3(a) - (b) – Approval of issue of Director Performance Rights
To consider and, if thought fit, to pass with or without amendment, each as a separate ordinary
resolution, the following:
‘That, for the purposes of Listing Rule 10.14 and for all other purposes, Shareholders approve
the issue of Director Performance Rights under the Plan, as follows:
(a) up to 2,300,966 Director Performance Rights to Mr Alex Rovira; and
(b) up to 1,756,078 Director Performance Rights to Mr Andrew Rich,
(or their respective nominee/s), on the terms and conditions in the Explanatory Memorandum.’
Resolution 4(a) - (b) – Approval of issue of Director ZEPOs
To consider and, if thought fit, to pass with or without amendment, each as a separate ordinary
resolution, the following:
'That, for the purposes of Listing Rule 10.14 and for all other purposes, Shareholders approve
the issue of:
(a) up to 607,855 Director ZEPOs to Mr Richard Crookes; and
(b) up to 444,202 Director ZEPOs to Mr Jonathan Downes,
(or their respective nominee/s), on the terms and conditions in the Explanatory Memorandum.’
Resolution 5 – Modification of existing Constitution
To consider and, if thought fit, to pass with or without amendment, as a special resolution the
following:
‘That, for the purposes of section 136(2) of the Corporations Act and for all other purposes, the
Constitution of the Company be modified by making the amendments contained in the
document tabled at this Meeting and signed by the Chair for the purposes of identification, with
effect from the date this Resolution is passed.’
3. Voting exclusions
Pursuant to the Listing Rules, the Company will disregard any votes cast in favour of:
(a) Resolution 3(a): by or on behalf of Mr Alex Rovira (or his nominee/s) and any other
person referred to in Listing Rule 10.14.1, 10.14.2 or 10.14.3 who is eligible to
participate in the Plan, or any of their respective associates.
(b) Resolution 3(b): by or on behalf of Mr Andrew Rich (or his nominee/s) and any other
person referred to in Listing Rule 10.14.1, 10.14.2 or 10.14.3 who is eligible to
participate in the Plan, or any of their respective associates.
(c) Resolution 4(a): by or on behalf of Mr Richard Crookes (or his nominee/s), and any
other person referred to in Listing Rule 10.14.1, 10.14.2 or 10.14.3 who is eligible to
participate in the Plan, or any of their respective associates.
(d) Resolution 4(b): by or on behalf of Mr Jonathan Downes (or his nominee/s), and any
other person referred to in Listing Rule 10.14.1, 10.14.2 or 10.14.3 who is eligible to
participate in the Plan, or any of their respective associates.
Notice of Annual General Meeting (Brightstar Resources Limited) Page 3
3444-2809-0449, v. 3
The above voting exclusions do not apply to a vote cast in favour of the relevant Resolution by:
(a) a person as proxy or attorney for a person who is entitled to vote on the Resolution, in
accordance with directions given to the proxy or attorney to vote on the Resolution in
that way;
(b) the Chair as proxy or attorney for a person who is entitled to vote on the Resolution, in
accordance with a direction given to the Chair to vote on the Resolution as the Chair
decides; or
(c) a holder acting solely in a nominee, trustee, custodial or other fiduciary capacity on
behalf of a beneficiary provided the following conditions are met:
(i) the beneficiary provides written confirmation to the holder that the beneficiary
is not excluded from voting, and is not an associate of a person excluded from
voting, on the Resolution; and
(ii) the holder votes on the Resolution in accordance with directions given by the
beneficiary to the holder to vote in that way.
4. Voting prohibitions
Resolution 1: In accordance with sections 250BD and 250R of the Corporations Act, a vote on
this Resolution must not be cast (in any capacity) by or on behalf of a member of the Key
Management Personnel details of whose remuneration are included in the Remuneration
Report, or a Closely Related Party of such a member.
A vote may be cast by such person if the vote is not cast on behalf of a person who is excluded
from voting on this Resolution, and:
(a) the person is appointed as a proxy by writing that specifies the way the proxy is to vote
on this Resolution; or
(b) the voter is the Chair and the appointment of the Chair as proxy does not specify the
way the proxy is to vote on this Resolution, but expressly authorises the Chair to
exercise the proxy even if this Resolution is connected with the remuneration of a
member of the Key Management Personnel.
Resolution 3(a) - (b) and Resolution 4(a) - (b): In accordance with section 250BD of the
Corporations Act, a person appointed as a proxy must not vote on the basis of that appointment,
on these Resolutions if:
(a) the proxy is either a member of the Key Management Personnel or a Closely Related
Party of such member; and
(b) the appointment does not specify the way the proxy is to vote on these Resolutions.
However, the above prohibition does not apply if:
(a) the proxy is the Chair; and
(b) the appointment expressly authorises the Chair to exercise the proxy even though
these Resolutions are connected directly or indirectly with remuneration of a member
of the Key Management Personnel.
Notice of Annual General Meeting (Brightstar Resources Limited) Page 4
3444-2809-0449, v. 3 BY ORDER OF THE BOARD
Ben Smith Company Secretary Brightstar Resources Limited
Dated: 13 October 2026
Notice of Annual General Meeting (Brightstar Resources Limited) Page 5
Brightstar Resources Limited ACN 100 727 491 (Company) Explanatory Memorandum
- Introduction
The Explanatory Memorandum has been prepared for the information of Shareholders in
connection with the business to be conducted at the Meeting to be held at the Forrest Centre,
Suite 2, Level 14, 221 St Georges Terrace, Perth WA 6000 on Tuesday, 24 November 2026 at
10:00am (AWST) (Meeting).
The Explanatory Memorandum forms part of the Notice which should be read in its entirety.
The Explanatory Memorandum contains the terms and conditions on which the Resolutions will
be voted.
The Explanatory Memorandum includes the following information to assist Shareholders in
deciding how to vote on the Resolutions:
Section 2 Action to be taken by Shareholders
Section 3 Annual Report
Section 4 Resolution 1 – Remuneration Report
Section 5 Resolution 2 – Re-election of Director – Mr Richard Crookes
Section 6 Resolution 3(a) – (b) – Approval of issue of Director Performance Rights
Section 7 Resolution 4(a) – (b) – Approval of issue of Director ZEPOs
Section 8 Resolution 5 – Modification of existing Constitution Schedule 1 Definitions Schedule 2 Summary of Plan Schedule 3 Summary of terms and conditions of Director Performance Rights Schedule 4 Valuation of Director Performance Rights Schedule 5 Summary of terms and conditions of Director ZEPOs Schedule 6 Valuation of Director ZEPOs
A Proxy Form is made available with this Notice. - Action to be taken by Shareholders Shareholders should read the Notice including the Explanatory Memorandum carefully before deciding how to vote on the Resolutions. 2.1 Voting in person To vote in person, attend the Meeting on the date and at the place set out above.
Notice of Annual General Meeting (Brightstar Resources Limited) Page 6
3444-2809-0449, v. 3
2.2 Voting by a corporation
A Shareholder that is a corporation may appoint an individual to act as its representative and
vote in person at the Meeting. The appointment must comply with the requirements of section
250D of the Corporations Act. The representative should bring to the Meeting evidence of his
or her appointment, including any authority under which it is signed.
2.3 Voting by proxy
A Proxy Form is made available with this Notice. This is to be used by Shareholders if they wish
to appoint a representative (a ‘proxy’) to vote in their place. All Shareholders are invited and
encouraged to attend the Meeting or, if they are unable to attend in person, complete the Proxy
Form to the Company in accordance with the instructions thereon. Lodgement of a Proxy Form
will not preclude a Shareholder from attending and voting at the Meeting in person.
Please note that:
(a) a member of the Company entitled to attend and vote at the Meeting is entitled to
appoint a proxy;
(b) a proxy need not be a member of the Company; and
(c) a member of the Company entitled to cast two or more votes may appoint two proxies
and may specify the proportion or number of votes each proxy is appointed to exercise,
but where the proportion or number is not specified, each proxy may exercise half of
the votes.
The available Proxy Form provides further details on appointing proxies and lodging Proxy
Forms.
Section 250BB(1) of the Corporations Act provides that an appointment of a proxy may specify
the way the proxy is to vote on a particular resolution and, if it does:
(a) the proxy need not vote on a show of hands, but if the proxy does so, the proxy must
vote that way (i.e. as directed);
(b) if the proxy has 2 or more appointments that specify different ways to vote on the
resolution – the proxy must not vote on a show of hands;
(c) if the proxy is the Chair of the meeting at which the resolution is voted on – the proxy
must vote on a poll, and must vote that way (i.e. as directed); and
(d) if the proxy is not the Chair – the proxy need not vote on the poll, but if the proxy does
so, the proxy must vote that way (i.e. as directed).
Section 250BC of the Corporations Act provides that, if:
(a) an appointment of a proxy specifies the way the proxy is to vote on a particular
resolution at a meeting of the Company’s members;
(b) the appointed proxy is not the chair of the meeting;
(c) at the meeting, a poll is duly demanded, or is otherwise required under section 250JA
on the resolution; and
(d) either the proxy is not recorded as attending the meeting or the proxy does not vote on
the resolution,
the Chair of the meeting is taken, before voting on the resolution closes, to have been appointed
as the proxy for the purposes of voting on the resolution at the meeting.
Notice of Annual General Meeting (Brightstar Resources Limited) Page 7
3444-2809-0449, v. 3
Your proxy voting instruction must be received by 10:00am (AWST) on Sunday, 22 November
2026, being not later than 48 hours before the commencement of the Meeting.
2.4 Chair’s voting intentions
The Chair intends to exercise all available proxies in favour of all Resolutions, unless the
Shareholder has expressly indicated a different voting intention.
If the Chair is your proxy, either by appointment or by default, and you have not indicated your
voting intention, you expressly authorise the Chair to exercise the proxy in respect of Resolution
1, Resolution 3(a) - (b) and Resolution 4(a) - (b) even though these Resolutions are connected
directly or indirectly with the remuneration of the Company’s Key Management Personnel.
2.5 Submitting questions
Shareholders may submit questions in advance of the Meeting to the Company. Questions
must be submitted by emailing the Company Secretary at [email protected] by
5:00pm (AWST) on Tuesday, 17 November 2026.
Shareholders will also have the opportunity to submit questions during the Meeting in respect
to the formal items of business. In order to ask a question during the Meeting, please follow the
instructions from the Chair.
The Chair will attempt to respond to the questions during the Meeting. The Chair will request
prior to a Shareholder asking a question that they identify themselves (including the entity name
of their shareholding and the number of Shares they hold).
3. Annual Report
In accordance with section 317 of the Corporations Act, Shareholders will be offered the
opportunity to discuss the Annual Report, including the Financial Report, the Directors’ Report
and the Auditor’s Report for the financial year ended 30 June 2026.
There is no requirement for Shareholders to approve the Annual Report.
At the Meeting, Shareholders will be offered the opportunity to:
(a) discuss the Annual Report which is available online at
https://brightstarresources.com.au/investors/#annual-reports;
(b) ask questions about, or comment on, the management of the Company; and
(c) ask the auditor questions about the conduct of the audit and the preparation and
content of the Auditor’s Report.
In addition to taking questions at the Meeting, written questions to the Chair about the
management of the Company, or to the Company’s auditor about:
(a) the preparation and content of the Auditor’s Report;
(b) the conduct of the audit;
(c) accounting policies adopted by the Company in relation to the preparation of the
financial statements; and
(d) the independence of the auditor in relation to the conduct of the audit,
may be submitted no later than five business days before the Meeting to the Company
Secretary at the Company’s registered office.
Notice of Annual General Meeting (Brightstar Resources Limited) Page 8
3444-2809-0449, v. 3 The Company will not provide a hard copy of the Company’s Annual Report to Shareholders unless specifically requested to do so. 4. Resolution 1 – Remuneration Report 4.1 General In accordance with subsection 250R(2) of the Corporations Act, the Company must put the Remuneration Report to the vote of Shareholders. The Directors’ Report contains the Remuneration Report which sets out the remuneration policy for the Company and the remuneration arrangements in place for the executive Directors, specified executives and non- executive Directors. In accordance with subsection 250R(3) of the Corporations Act, Resolution 1 is advisory only and does not bind the Directors. If Resolution 1 is not passed, the Directors will not be required to alter any of the arrangements in the Remuneration Report. If the Company’s Remuneration Report receives a ‘no’ vote of 25% or more (Strike) at two consecutive annual general meetings, Shareholders will have the opportunity to remove the whole Board, except the managing director (if any). Where a resolution on the Remuneration Report receives a Strike at two consecutive annual general meetings, the Company will be required to put to Shareholders at the second annual general meeting a resolution on whether another meeting should be held (within 90 days) at which all Directors (other than the managing director, if any) who were in office at the date of approval of the applicable Directors’ Report must stand for re-election. The Company’s Remuneration Report did not receive a Strike at the 2025 annual general meeting. If the Remuneration Report receives a Strike at this Meeting, Shareholders should be aware that if a second Strike is received at the 2027 annual general meeting, this may result in the re-election of the Board. The Chair will allow a reasonable opportunity for Shareholders as a whole to ask about or make comments on the Remuneration Report. 4.2 Additional information Resolution 1 is an ordinary resolution. Given the personal interests of all Directors in this Resolution, the Board makes no recommendation to Shareholders regarding this Resolution. 5. Resolution 2 – Re-election of Director – Mr Richard Crookes 5.1 General Clause 14.2 of the Constitution provides that at each annual general meeting, one-third of the Directors must retire. Listing Rule 14.5 provides that there must be an election of Directors at each annual general meeting of the Company. Mr Richard Crookes was elected as a Director at the Company’s 2024 annual general meeting and has agreed to retire by rotation at this Meeting. Accordingly, Mr Crookes retires as a Director at this Meeting and, being eligible and offering himself for re-election, seeks re-election pursuant to Resolution 2. If Resolution 2 is passed, Mr Crookes will retire at the conclusion of the Meeting and will be immediately re-elected as a Director.
Notice of Annual General Meeting (Brightstar Resources Limited) Page 9
3444-2809-0449, v. 3
If Resolution 2 is not passed, Mr Crookes will retire at the conclusion of the Meeting and will
not be re-elected as a Director at this Meeting.
5.2 Mr Richard Crookes
Mr Crookes has over 38 years' experience in the resources and investments industries. He is
a geologist by training having previously worked as the Chief Geologist and Mining Manager of
Ernest Henry Mining in Australia.
Mr Crookes is currently a Partner of Lionhead Resources (a Critical Minerals Investment Fund)
and formerly an Investment Director at EMR Capital. Prior to that he was an Executive Director
in Macquarie Bank's Metals Energy Capital (MEC) division where he managed all aspects of
the bank's principal investments in mining and metals companies.
Mr Crookes holds a Bachelor of Science (Geology) and Graduate Diploma in Applied Finance.
He is a member of the Australasian Institute of Mining and Metallurgy, Financial Services
Professional Body CISI, and Australian Institute of Company Directors.
Mr Crookes is currently the Non-Executive Chairman of Black Rock Mining Limited (ASX: BKT).
If re-elected, Mr Crookes is considered by the Board (with Mr Crookes abstaining) to be an
independent Director. Mr Crookes is not considered by the Board (with Mr Crookes abstaining)
to hold any interest, position or relationship that might influence, or reasonably be perceived to
influence, in a material respect his capacity to bring an independent judgement to bear on
issues before the Board and to act in the best interests of the entity as a whole rather than in
the interests of an individual security holder or other party.
Mr Crookes has acknowledged to the Company that he will have sufficient time to fulfil his
responsibilities as a Director.
5.3 Board recommendation
The Board (other than Mr Crookes who has a personal interest in the outcome of this
Resolution) supports the re-election of Mr Crookes. Mr Crookes’ contributions to the Board’s
activities to date have been invaluable and his extensive financial, strategic and governance
experience will continue to enhance the Board’s ability to perform its role.
5.4 Additional information
Resolution 2 is an ordinary Resolution.
6. Resolution 3(a) – (b) – Approval of issue of Director Performance Rights
6.1 General
The Company is proposing, subject to obtaining Shareholder approval, to issue up to a total of
4,057,044 Performance Rights to Messrs Alex Rovira and Andrew Rich (or their respective
nominee/s) as part of the Company’s FY2027 short-term and three-year long-term incentive
programs under the Plan (Director Performance Rights), as follows:
Director Number of Director Performance Rights
STI program LTI program
Mr Alex Rovira 613,591 1,687,375
Mr Andrew Rich 561,945 1,194,133
Total 1,175,536 2,881,508
Notice of Annual General Meeting (Brightstar Resources Limited) Page 10
3444-2809-0449, v. 3
The Company is in an important stage of development with significant opportunities and
challenges in both the near and long-term, and the proposed issue of the Director Performance
Rights seeks to align the efforts of Messrs Rovira and Rich in seeking to achieve growth of the
Share price and in the creation of Shareholder value. In addition, the Board also believes that
incentivising with Performance Rights is a prudent means of conserving the Company's
available cash reserves. The Board believes it is important to offer these Director Performance
Rights to continue to attract and maintain highly experienced and qualified Board members in
a competitive market. The proposed grant of the Director Performance Rights under this
Resolution is a key component of Messrs Rovira’s and Rich’s respective remuneration
arrangements.
Resolution 3(a) and (b) seek Shareholder approval pursuant to Listing Rule 10.14 for the issue
of up to 4,057,044 Director Performance Rights under the Plan to Messrs Rovira and Rich (or
their respective nominee/s).
6.2 Listing Rule 10.14
Listing Rule 10.14 provides that an entity must not permit any of the following persons to acquire
Equity Securities under an employee incentive scheme without the approval of its
Shareholders:
(a) a director of the entity (Listing Rule 10.14.1);
(b) an associate of a person referred to in Listing Rule 10.14.1 (Listing Rule 10.14.2);
(c) a person whose relationship with the entity or a person referred to in Listing Rule
10.14.1 or 10.14.2 is such that, in ASX's opinion, the acquisition should be approved
by Shareholders.
Approval pursuant to Listing Rule 7.1 is not required for the issue of the Director Performance
Rights as approval is being obtained under Listing Rule 10.14. Accordingly, the issue of the
Director Performance Rights will not be included in the Company's 15% annual placement
capacity in Listing Rule 7.1.
The effect of Shareholders passing Resolution 3(a) and (b) will be to allow the Company to
proceed with the issue of the Director Performance Rights to Messrs Rovira and Rich (or their
respective nominee/s) in the proportions listed above.
If Resolution 3(a) and (b) are not passed, the Company will not be able to proceed with the
issue of the Director Performance Rights to Messrs Rovira and Rich (or their respective
nominee/s) and the Company will consider other alternative commercial means to incentivise
Messrs Rovira and Rich, including by the payment of cash, subject to the requirements of the
Constitution, Corporations Act and Listing Rules.
Resolution 3(a) and (b) are not inter-conditional, and Shareholders may approve one or all of
those Resolutions (in which case, the Director Performance Rights the subject of the relevant
Resolution will be issued), even though Shareholders have not approved all of these
Resolutions.
6.3 Specific information required by Listing Rule 10.15
Pursuant to and in accordance with Listing Rule 10.15, the following information is provided in
relation to the proposed issue of the Director Performance Rights:
(a) The Director Performance Rights will be issued under the Plan to:
(i) Mr Alex Rovira pursuant to Resolution 3(a); and
(ii) Mr Andrew Rich pursuant to Resolution 3(b),
Notice of Annual General Meeting (Brightstar Resources Limited) Page 11
3444-2809-0449, v. 3
or their respective nominee/s.
(b) Each of Messrs Rovira and Rich are a related party of the Company by virtue of being
a Director of the Company and fall into the category stipulated by Listing Rule 10.14.1.
In the event the Director Performance Rights are issued to a nominee of Mr Rovira or
Mr Rich, that nominee will fall into the category stipulated by Listing Rule 10.14.2.
(c) The maximum number of Director Performance Rights to be issued to Messrs Rovira
and Rich (or their respective nominee/s) under the Plan is 4,057,044, in the proportions
in Section 6.1 above.
(d) The current total annual remuneration package for Messrs Rovira and Rich as at the
date of this Notice is set out in the table below:
Alex Rovira Andrew Rich
Base Salary $492,100 $450,680
Maximum
short-term
incentive
Short-term incentive of 40% of
Mr Rovira’s base salary. The
STI is subject to the satisfaction
of certain performance-based
criteria by 30 June 2027.
The number of Performance
Rights to be issued under the
STI was determined by dividing
100% of Mr Rovira’s STI award
(being $196,840) by $0.3208,
being the volume weighted
average price of the Company’s
Shares calculated over 20
consecutive trading days in
which Shares have actually
traded up to but excluding 1
July 2026.
Short-term incentive of 40% of
Mr Rich’s base salary. The STI
is subject to the satisfaction of
certain performance-based
criteria by 30 June 2027.
The number of Performance
Rights to be issued under the
STI was determined by dividing
100% of Mr Rich’s STI award
(being $180,272) by $0.3208,
being the volume weighted
average price of the Company’s
Shares calculated over 20
consecutive trading days in
which Shares have actually
traded up to but excluding 1
July 2026.
Maximum
long-term
incentive
Long-term incentive delivered
as Performance Rights of 110%
of Mr Rovira’s base salary each
year over the term of the
FY2027 LTI program. The LTI
is subject to the satisfaction of
certain performance-based
criteria by 30 June 2029. The
number of Performance Rights
to be issued under the FY2027
LTI was determined by dividing
the aggregate value of the LTI
by the Share price of $0.3208,
being the volume weighted
average price of the Company’s
Shares calculated over 20
consecutive trading days in
which Shares have actually
traded up to but excluding 1
July 2026.
Long-term incentive delivered
as Performance Rights of 85%
of Mr Rich’s base salary each
year over the term of the
FY2027 LTI program. The LTI
is subject to the satisfaction of
certain performance-based
criteria by 30 June 2029. The
number of Performance Rights
to be issued under the FY2027
LTI was determined by dividing
the aggregate value of the LTI
by the Share price of $0.3208,
being the volume weighted
average price of the Company’s
Shares calculated over 20
consecutive trading days in
which Shares have actually
traded up to but excluding 1
July 2026.
Notice of Annual General Meeting (Brightstar Resources Limited) Page 12
3444-2809-0449, v. 3
(e) Since the Plan was last approved by Shareholders at the 2025 annual general meeting,
an aggregate of 4,821,428 Performance Rights have previously been issued under the
Plan to Messrs Rovira and Rich (or their nominee/s) for nil cash consideration, as
follows:
(i) 2,678,571 Performance Rights to Mr Rovira; and
(ii) 2,142,857 Performance Rights to Mr Rich.
(f) The Director Performance Rights will be issued on the terms and conditions set out in
Schedule 3. In respect of Tranche 2 of the STI Vesting Conditions in paragraph 3 of
Schedule 3, the Company confirms that this vesting condition has been satisfied as at
the date of this Notice – the Company refers to its ASX announcement of 28
September 2026.
(g) The Board considers that Performance Rights, rather than Shares or cash, are an
appropriate form of incentive because they seek to:
(i) align the efforts of Messrs Rovira and Rich in seeking to achieve growth of the
Share price and in the creation of Shareholder value;
(ii) reward Messrs Rovira and Rich for their continued service to the Company;
and
(iii) conserve the Company’s available cash reserves.
(h) The Company’s valuation of the Director Performance Rights is in Schedule 4, with a
summary below:
Director
Valuation of Director Performance
Rights
1
Mr Alex Rovira $1,459,150
Mr Andrew Rich $1,114,997
Total $2,574,147
Note 1: Subject to effects of rounding.
(i) The Director Performance Rights will be issued as soon as practicable following the
Meeting and in any event no later than three years after the Meeting.
(j) The Director Performance Rights will be issued for nil cash consideration and will be
provided as an incentive component to Messrs Rovira’s and Rich’s remuneration
packages.
(k) A summary of the material terms of the Plan is in Schedule 2.
(l) No loan will be provided to Messrs Rovira or Rich in relation to the issue of the Director
Performance Rights.
(m) Details of any Securities issued under the Plan will be published in the annual report of
the Company relating to the period in which they were issued along with a statement
that approval for the issue was obtained under Listing Rule 10.14.
(n) Any additional persons covered by Listing Rule 10.14 who become entitled to
participate in an issue of Securities under the Plan after the Resolutions are approved
and who were not named in the Notice will not participate until approval is obtained
under Listing Rule 10.14.
Notice of Annual General Meeting (Brightstar Resources Limited) Page 13
3444-2809-0449, v. 3
(o) A voting exclusion statement is included in the Notice.
6.4 Chapter 2E of the Corporations Act
In accordance with Chapter 2E of the Corporations Act, in order to give a financial benefit to a
related party, the Company must:
(a) obtain Shareholder approval in the manner set out in section 217 to 227 of the
Corporations Act; and
(b) give the benefit within 15 months following such approval, unless the giving of the
financial benefit falls within an exception set out in sections 210 to 216 of the
Corporations Act.
The proposed issue of the Director Performance Rights constitutes giving a financial benefit to
related parties of the Company.
The Board (with Messrs Rovira and Rich abstaining) considers that the grant of the Director
Performance Rights constitutes reasonable remuneration in the circumstances and therefore
falls within the exception under section 211 of the Corporations Act.
6.5 Additional information
Each of Resolution 3(a) and (b) is a separate ordinary resolution and are not inter-conditional.
The Board (with Messrs Rovira and Rich abstaining) recommends that Shareholders vote in
favour of Resolution 3(a) and (b).
7. Resolution 4(a) – (b) – Approval of issue of Director ZEPOs
7.1 General
The Company is proposing, subject to obtaining Shareholder approval, to issue up to a total of
1,052,057 zero exercise price Options to Messrs Richard Crookes and Jonathan Downes (or
their respective nominee/s) under the Plan (Director ZEPOs), as follows:
Director Number of Director ZEPOs
Mr Richard Crookes 607,855
Mr Jonathan Downes 444,202
Total 1,052,057
The Company is in an important stage of development with significant opportunities and
challenges in both the near and long-term, and the proposed issue of the Director ZEPOs seeks
to align the efforts of Messrs Crookes and Downes in the creation of Shareholder value. In
addition, the Board also believes that incentivising with Options is a prudent means of
conserving the Company's available cash reserves. The Board believes it is important to offer
these Director ZEPOs to continue to attract and maintain highly experienced and qualified
Board members in a competitive market.
The Director ZEPOs will vest in three equal tranches in the manner set out in Schedule 5,
subject to the holder (or the person who is entitled to be registered as the holder) remaining
employed or engaged by the Company for a continuous period up to and including the relevant
Vesting Date (Retention Condition). The Director ZEPOs, including the Retention Condition,
are designed to ensure the Company can continue to attract and maintain highly experienced
Notice of Annual General Meeting (Brightstar Resources Limited) Page 14
3444-2809-0449, v. 3
and qualified Board members in a competitive market as the Company matures from an
exploration/development company into a multi-asset gold producer.
Resolution 4(a) and (b) seek Shareholder approval pursuant to Listing Rule 10.14 for the issue
of up to 1,052,057 Director ZEPOs under the Plan to Messrs Crookes and Downes (or their
respective nominee/s).
7.2 Listing Rule 10.14
A summary of Listing Rule 10.14 is set out in Section 6.2 above.
Approval pursuant to Listing Rule 7.1 is not required for the issue of the Director ZEPOs as
approval is being obtained under Listing Rule 10.14. Accordingly, the issue of the Director
ZEPOs will not be included in the Company’s 15% annual placement capacity in Listing Rule
7.1 or the maximum permitted number of Equity Securities issued under the Listing Rule 7.2
exception 13(b).
The effect of Shareholders passing Resolution 4(a) and (b) will be to allow the Company to
proceed with the issue of the Director ZEPOs to Messrs Crookes and Downes (or their
respective nominee/s) in the proportions listed above.
If Resolution 4(a) and (b) are not passed, the Company will not be able to proceed with the
issue of the Director ZEPOs to Messrs Crookes and Downes (or their respective nominee/s)
and the Company will consider other alternative commercial means to incentivise Messrs
Crookes and Downes, including by the payment of cash, subject to the requirements of the
Constitution, Corporations Act and Listing Rules.
Resolution 4(a) and (b) are not conditional on each other, and Shareholders may approve one
or all of those Resolutions (in which case, the Director ZEPOs the subject of the relevant
Resolution(s) will be issued), even though Shareholders have not approved all of these
Resolutions.
7.3 Specific information required by Listing Rule 10.15
Pursuant to and in accordance with Listing Rule 10.15, the following information is provided in
relation to the proposed issue of the Director ZEPOs:
(a) The Director ZEPOs will be issued under the Plan to:
(i) Mr Richard Crookes pursuant to Resolution 4(a); and
(ii) Mr Jonathan Downes pursuant to Resolution 4(b);
or their respective nominee/s.
(b) Each of Messrs Crookes and Downes are a related party of the Company by virtue of
being a Director of the Company and fall into the category stipulated by Listing Rule
10.14.1. In the event the Director ZEPOs are issued to a nominee of Messrs Crookes
or Downes, that nominee will fall into the category stipulated by Listing Rule 10.14.2.
(c) The maximum number of Director ZEPOs to be issued to Messrs Crookes and Downes
(or their respective nominee/s) under the Plan is 1,052,057, in the proportions set out
in Section 7.1 above.
(d) The current total annual remuneration package for each of Messrs Crookes and
Downes as at the date of this Notice is set out in the table below:
Notice of Annual General Meeting (Brightstar Resources Limited) Page 15
3444-2809-0449, v. 3 Director Salary and fees (exclusive of superannuation, where applicable)
Mr Richard Crookes $130,000
Mr Jonathan Downes $95,000
(e) Since the Plan was last approved by Shareholders at the 2025 annual general meeting,
no Equity Securities have been issued under the Plan to Messrs Crookes and Downes.
(f) The Director ZEPOs will vest in three equal tranches annually in the manner set out in
Schedule 5, subject to the holder (or the person who is entitled to be registered as the
holder) remaining employed or engaged by the Company for a continuous period up to
and including the relevant Vesting Date.
(g) The Director ZEPOs will be issued on the terms and conditions set out in Schedule 5.
(h) The Board considers that Options, rather than cash, are an appropriate form of
incentive because they seek to:
(i) align the efforts of Messrs Crookes and Downes in seeking to achieve growth
of the Share price and in the creation of Shareholder value;
(ii) reward Messrs Crookes and Downes for continued service to the Company,
whilst incentivising on-going engagement with the Company through the
Retention Condition;
(iii) conserve the Company's available cash reserves; and
(iv) enable the Company to attract and retain Directors of an appropriate calibre
and experience, while keeping the cash component of their remuneration at a
modest level.
(i) A valuation of the Director ZEPOs is in Schedule 6, with a summary below:
Director Valuation of Director ZEPOs
1
Mr Richard Crookes $392,066
Mr Jonathan Downes $286,510
Total $678,576
Note 1: Subject to effects of rounding.
(j) The Director ZEPOs will be issued as soon as practicable following the Meeting and in
any event no later than three years after the Meeting.
(k) The Director ZEPOs will be issued for nil cash consideration and will be provided as an
incentive component to Messrs Crookes’ and Downes’ remuneration packages.
(l) A summary of the material terms of the Plan is in Schedule 2.
(m) No loan will be provided to Messrs Crookes and Downes in relation to the issue of the
Director ZEPOs.
(n) Details of any securities issued under the Plan will be published in the annual report of
the Company relating to the period in which they were issued, along with a statement
that approval for the issue was obtained under Listing Rule 10.14.
(o) Any additional persons covered by Listing Rule 10.14 who become entitled to
Notice of Annual General Meeting (Brightstar Resources Limited) Page 16
3444-2809-0449, v. 3
participate in an issue of securities under the Plan after the resolution is approved and
who were not named in the Notice will not participate until approval is obtained under
Listing Rule 10.14.
(p) A voting exclusion statement is included in the Notice.
7.4 Chapter 2E of the Corporations Act
A summary of Chapter 2E of the Corporations Act is in Section 6.4 above.
The proposed issue of the Director ZEPOs constitutes giving a financial benefit to related
parties of the Company.
The Board (with Messrs Crookes and Downes abstaining) considers that the grant of the
Director ZEPOs constitutes reasonable remuneration in the circumstances and therefore falls
within the exception under section 211 of the Corporations Act.
7.5 Additional information
Each of Resolution 4(a) and (b) is a separate ordinary resolution and are not inter conditional.
The Board (with Messrs Crookes and Downes abstaining) recommends that Shareholders vote
in favour of Resolution 4(a) and (b).
8. Resolution 5 – Modification of existing Constitution
8.1 General
Under section 136(2) of the Corporations Act, a company may modify or repeal its constitution
or a provision of its constitution by special resolution of Shareholders.
Resolution 5 seeks the approval of Shareholders to modify the Company’s existing Constitution
to incorporate amendments to the Corporations Act regarding the holding of meetings of
Shareholders using virtual meeting technology.
The Directors believe that it is preferable in the circumstances to simply modify the existing
Constitution rather than repealing the entire existing Constitution and replacing it with a new
constitution.
The Directors believe these amendments are not material nor will they have any significant
impact on Shareholders.
A copy of the modified Constitution is available for review by Shareholders at the office of the
Company. A copy of the modified Constitution can also be sent to Shareholders upon request
to the Company Secretary at [email protected]. Shareholders are invited to
23 October 2026 BRIGHTSTAR – UPCOMING ANNUAL GENERAL MEETING
Dear Shareholders Brightstar Resources Limited (ASX: BTR) (BTR or the Company) will be holding its Annual General Meeting at 10:00am (AWST) on Tuesday, 24 November 2026 at The Forrest Centre, Suite 2, Level 14, 221 St Georges Terrace, Perth, WA 6000.
In accordance with section 110D(1) of the Corporations Act 2001 (Cth), the Company will not be sending hard copies of the Notice of Meeting (Notice) to shareholders unless a shareholder has made a valid election to receive such documents in hard copy. The Notice can be viewed and downloaded from the Company’s website at www.brightstarresources.com.au or ASX at www2.asx.com.au.
The Company strongly encourages Shareholders to lodge a directed proxy form prior to the meeting. Questions should also be submitted in advance of the Meeting as this will provide management with the best opportunity to prepare for the meeting, for example by preparing answers in advance to Shareholders questions. However, votes and questions may also be submitted during the Meeting.
Shareholders can access the Notice of Meeting and Explanatory Memorandum on Brightstar’s website:
http://www.brightstarresources.com.au/asx-announcements/
Alternatively, a complete copy of the Notice of Meeting and Explanatory Statement has been posted on
the Company’s ASX market announcements page.
If you have nominated an email address and have elected to receive electronic communications from the
Company, you will also receive an email to your nominated email address with a link to an electronic copy
of the Notice of Meeting and Explanatory Statement.
In order to receive electronic communications from the Company in the future, please update your
Shareholder details online. To make the change, please log-in or register at: www.investorcentre.com/au
and follow the prompts. Once logged in you can also lodge your proxy vote online.
If you are unable to access the Notice of Meeting and Explanatory Memorandum online please contact
the Company Secretary, Mr Benjamin Smith, on +61 8 9481 0389 or via email at
[email protected].
This announcement is authorised for market release by the Managing Director on behalf of the Board.
Sincerely,
Alex Rovira
Managing Director
22 October 2026
DEEP DRILLING MATERIALLY EXTENDS TWO MILE HILL
BELOW THE CURRENT 1.45 MILLION OUNCE RESOURCE
305m @ 1.33g/t Au from 584m in the host tonalite, including
173m @ 1.42g/t Au BELOW the current Mineral Resource limit
• Assay results received for TMHDD26003, the first hole of a four-hole, ~3,800m deep diamond
drilling program at the Two Mile Hill-Shillington deposit, within the 3.6Moz @ 1.4g/t Au
Sandstone Gold Project
• The drilling was designed to test for extensions to the Shirvington Zone at depth - TMHDD26003
is the southernmost hole of the program and tests the southern margin of the deposit
• Within the host tonalite unit, the drillhole produced a bulk intercept of 305m @ 1.33g/t Au from
584m, including:
▪ 64.9m @ 1.47g/t Au from 585.1m
▪ 19.0m @ 1.67g/t Au from 653.0m
▪ 28.0m @ 1.95g/t Au from 713.0m
▪ 6.0m @ 11.2g/t Au from 765.0m
• TMHDD26003 drilled through the existing Mineral Resource envelope and further into the
Shirvington Zone at depth. Within the bulk intercept, the area beneath the current Mineral
Resource produced an intercept of 173m @ 1.42g/t Au from 716m
• The Two Mile Hill-Shillington deposit hosts a current Mineral Resource Estimate (MRE) of
▪ 24.6Mt @ 1.8g/t Au for 1.45Moz Au
1
• The September 2026 MRE showed contained ounces increasing with depth, peaking at ~6koz per
vertical metre approximately 595m below surface
1
. The 173m @ 1.42g/t Au interval in
TMHDD26003 extends from ~620m to ~770m vertical depth, demonstrating that the
mineralised tonalite continues below the current MRE and remains open at depth
• Additional tonalite-hosted intercepts, outside the bulk intercept, include:
▪ 6.7m @ 5.13g/t Au from 484.0m
▪ 5.5m @ 2.10g/t Au from 501.5m
▪ 1.2m @ 11.1g/t Au from 1,010.5m
• Assay results are pending for the remaining three holes of the program
• A multi-rig follow-up drilling program totalling ~6,500m is scheduled to commence later
this month, targeting extensions to the Shirvington Zone along strike and at depth and aiming
to define the full extent of the tonalite, including its western contact
2
Brightstar Resources Limited (ASX: BTR) (Brightstar or the Company) is pleased to announce initial assay
results from a ~3,800m diamond drilling program targeting the Two Mile Hill-Shillington deposit, part
of the 3.6Moz @ 1.4g/t Au Sandstone Gold Project
1
.
The drilling program intersected numerous occurrences of visible gold
2,4
within wide zones of tonalite-
hosted mineralisation, extending the known width of the unit to >400m.
Assay results have now been returned for TMHDD26003, which produced a bulk intercept within the host
tonalite of 305m @ 1.33g/t Au from 584m, including 173m @ 1.42g/t Au from 716m beneath the current
Mineral Resource.
Brightstar’s Managing Director, Alex Rovira, commented:
“The first hole from the deep Two Mile Hill drilling program has produced an excellent result, meeting our
expectations and delivering a broad, 300m-plus downhole zone of gold mineralisation within the host tonalite
at grades consistent with our recently updated Mineral Resource model.
More significantly, intersecting 173m @ 1.42g/t Au immediately below the limit of the existing Mineral
Resource envelope, at almost double the 0.73g/t Au cut-off grade used to report the underground Mineral
Resource, demonstrates that the tonalite remains mineralised at depth and highlights the potential for further
material Mineral Resource growth as the results of the current drilling program are received and incorporated
into the model. We continue to be excited by the potential for a large-scale, bulk-underground mining operation
at Two Mile Hill to complement the existing, well-defined potential open pit mines being assessed in the Pre-
Feasibility Study due this quarter.
With assays still pending for three holes, preparations are already underway for the next phase of follow-up
drilling at Two Mile Hill. The planned multi-rig ~6,500m program is scheduled to commence this month,
targeting southern extensions of the Shirvington Zone, further confirming mineralisation at depth and defining
the western tonalite contact to better constrain the extent of this prospective host unit.
In parallel, targeting work is progressing across the neighbouring felsic intrusive prospects along the Two
Mile Hill to Bull Oak corridor. We aim to test a number of these targets in the current December quarter,
ahead of a more substantial drilling program across the corridor in early 2027.”
3
Figure 1: Central Sandstone Gold Project area
TECHNICAL DISCUSSION TWO MILE HILL-SHILLINGTON DEPOSIT The combined Two Mile Hill-Shillington deposit hosts a current MRE of 24.6Mt @ 1.8g/t Au for 1.45Moz 1 . The local geology consists of a tonalite intrusive stock intruded into a northeast-dipping package of basalt and banded iron formation (BIF). The majority of the mineralisation is hosted within the tonalite itself, present as northeast-dipping lodes, typically associated with quartz-sulphide veins. Coarse visible gold has also been identified outside of the veins, within the matrix of the tonalite. Additional mineralisation is also hosted within the adjacent BIF (Shillington-type) and basalt. The Shirvington Zone features a significant widening of the host tonalite intrusion at depth, and was highlighted as a focus for material Mineral Resource growth by recent drillhole TMHRCD26020 3 , which produced a bulk, unconstrained intercept of 305.4m @ 1.82g/t Au from 351.9m.
4
The current drilling program comprised four deep diamond drillholes for ~3,800m and aimed to intersect
the Shirvington Zone at depth, delineating the contacts of the tonalite and validating the mineralisation
intersected in TMHRCD26020. The drilling did not reach the western contact of the tonalite, despite
extensions beyond the planned depths, but has extended the known width of the intrusion to >400m.
Significant visible gold was identified from all four drillholes, totalling 93 individual occurrences
2,4
.
Assay results have now been received for TMHDD26003.
The drillhole produced a bulk intercept within the tonalite of 305m @ 1.33g/t Au from 584m.
TMHDD26003 is the southernmost of the four holes and tests the southern margin of the Shirvington
Zone. As more drilling is progressively completed, grade variations within the host tonalite are now
becoming apparent.
To illustrate the continuous nature of the low-grade background mineralisation inside the tonalite, bulk
intercepts are no longer reported on the unconstrained basis previously utilised. Bulk intercepts are now
reported at a 0.25g/t Au cut-off, with a maximum of 5m consecutive internal dilution and a minimum
overall grade of 0.5g/t Au.
Significant intercepts inside this bulk intercept include:
▪ 64.9m @ 1.47g/t Au from 585.1m, including 1.2m @ 8.72g/t Au from 601.0m
▪ 19.0m @ 1.67g/t Au from 653.0m, including 1m @ 9.09g/t Au from 657.0m
▪ 28.0m @ 1.95g/t Au from 713.0m, including 1.1m @ 13.4g/t Au from 723.9m
▪ 6.0m @ 11.2g/t Au from 765.0m, including 1m @ 59.9g/t Au from 770m
▪ 1.0m @ 16.0g/t Au from 783.0m
Additional significant intercepts were also produced from within the tonalite, outside of the bulk intercept,
where the background grade of the tonalite was below cut-off. These include:
▪ 6.7m @ 5.13g/t Au from 484.0m, including 1.1m @ 20.4g/t Au from 484m
▪ 5.5m @ 2.10g/t Au from 501.5m
▪ 1.2m @ 11.1g/t Au from 1,010.5m
Gold mineralisation was also intersected in the adjacent basalt/BIF sequence, away from the tonalite body.
Significant intercepts include:
▪ 3.0m @ 8.54g/t Au from 373.0m, including 1.0m @ 24.2g/t Au from 374m
▪ 1.2m @ 3.66g/t Au from 450m
5
Figure 2: Location map of the Two Mile Hill diamond drillhole collars
6
Figure 3: Cross section A-A’ at the Two Mile Hill deposit, showing drillhole TMHDD26003 in relation to the existing MRE.
7
Table 1: Significant Intercepts (>1.0g/t Au) for the Two Mile Hill diamond drilling,
+10 gram-metre intercepts highlighted.
Hole ID
From (m) To (m) Drilled Interval (m) Au (g/t) Interval Gram- metres TMHDD26003 317.5 319.0 1.5 1.40 1.5m @ 1.40g/t from 317.5m 2.10 TMHDD26003 373 376 3 8.54 3m @ 8.54g/t from 373m 25.6 TMHDD26003 including 374 375 1 24.2 1m @ 24.2g/t from 374m 24.2 TMHDD26003 386 387 1 3.09 1m @ 3.09g/t from 386m 3.10 TMHDD26003 440 441 1 2.16 1m @ 2.16g/t from 440m 2.20 TMHDD26003 450.0 451.2 1.2 3.66 1.2m @ 3.66g/t from 450m 4.40 TMHDD26003 484.0 490.7 6.7 5.13 6.7m @ 5.13g/t from 484m 34.4 TMHDD26003 including 484.0 485.1 1.1 20.4 1.1m @ 20.4g/t from 484m 22.4 TMHDD26003 including 489.8 490.7 0.9 11.7 0.9m @ 11.7g/t from 489.8m 10.5 TMHDD26003 501.5 507.0 5.5 2.10 5.5m @ 2.10g/t from 501.5m 11.6 TMHDD26003 565.2 567.2 2 2.97 2m @ 2.97g/t from 565.2m 5.90 TMHDD26003 585.1 650.0 64.9 1.47 64.9m @ 1.47g/t from 585.1m 95.4 TMHDD26003 including 601.0 602.2 1.2 8.72 1.2m @ 8.72g/t from 601m 10.5 TMHDD26003 653 672 19 1.67 19m @ 1.67g/t from 653m 31.7 TMHDD26003 including 657 658 1 9.09 1m @ 9.09g/t from 657m 9.09 TMHDD26003 679 682 3 1.27 3m @ 1.27g/t from 679m 3.80 TMHDD26003 688 689 1 1.33 1m @ 1.33g/t from 688m 1.30 TMHDD26003 691.8 698.0 6.2 1.87 6.2m @ 1.87g/t from 691.8m 11.6 TMHDD26003 704 705 1 1.61 1m @ 1.61g/t from 704m 1.60 TMHDD26003 713 741 28 1.95 28m @ 1.95g/t from 713m 54.6 TMHDD26003 including 723.9 725.0 1.1 13.4 1.1m @ 13.4g/t from 723.9m 14.7 TMHDD26003 including 740 741 1 12.1 1m @ 12.1g/t from 740m 12.1 TMHDD26003 746 756 10 1.61 10m @ 1.61g/t from 746m 16.1 TMHDD26003 765 771 6 11.2 6m @ 11.2g/t from 765m 67.2 TMHDD26003 including 770 771 1 59.9 1m @ 59.9g/t from 770m 59.9 TMHDD26003 775 777 2 1.31 2m @ 1.31g/t from 775m 2.60 TMHDD26003 783 784 1 16.0 1m @ 16.0g/t from 783m 16.0 TMHDD26003 788 794 6 1.89 6m @ 1.89g/t from 788m 11.3 TMHDD26003 798 800 2 1.24 2m @ 1.24g/t from 798m 2.50 TMHDD26003 841.9 842.9 1 1.33 1m @ 1.33g/t from 841.9m 1.30 TMHDD26003 848 850 2 1.24 2m @ 1.24g/t from 848m 2.50 TMHDD26003 860 874 14 1.23 14m @ 1.23g/t from 860m 17.2
8 Hole ID
From (m) To (m) Drilled Interval (m) Au (g/t) Interval Gram- metres TMHDD26003 877.0 882.7 5.7 2.02 5.7m @ 2.02g/t from 877m 11.5 TMHDD26003 886 888 2 6.41 2m @ 6.41g/t from 886m 12.8 TMHDD26003 including 886.0 887.1 1.1 10.5 1.1m @ 10.5g/t from 886.0m 11.6 TMHDD26003 895 896 1 2.67 1m @ 2.67g/t from 895m 2.70 TMHDD26003 904 905.1 1.1 3.01 1.1m @ 3.01g/t from 904m 3.30 TMHDD26003 915.0 915.6 0.6 2.07 0.6m @ 2.07g/t from 915m 1.20 TMHDD26003 929 930 1 1.33 1m @ 1.33g/t from 929m 1.30 TMHDD26003 1010.5 1011.7 1.2 11.1 1.2m @ 11.1g/t from 1010.5m 13.3
Table 2: Bulk tonalite-hosted significant Intercepts for the Two Mile Hill diamond drilling
(total intercept >0.5g/t Au, cut-off 0.25g/t Au, maximum 5m consecutive internal dilution)
Hole ID
From
(m)
To
(m)
Drilled
Interval
(m)
Au
(g/t)
Interval
Gram-
metres
Notes
TMHDD26003 584 889 305 1.33 305m @ 1.33g/t from 584m 406
TMHDD26003 including 716 889 173 1.42 173m @ 1.42 g/t from 716m 246
Intercept
beneath the
current MRE
Table 3: Two Mile Hill diamond drillhole collar information. All holes are located on tenement M57/128. Grid coordinates shown in MGA94 Zone 50. Hole ID Hole Type Easting Northing RL Dip Azimuth Hole Depth (m) Status TMHDD26003 DD 723362 6892451 519 -60 270 1039.2 This ASX announcement TMHDD26004 DD 723353 6892546 519 -60 265 888.3 Assays pending TMHDD26005 DD 723362 6892592 522 -60 267 901.4 Assays pending TMHDD26006 DD 723436 6892529 519 -64 268 1010.9 Assays pending
This ASX announcement has been approved by the Managing Director on behalf of the Board of Brightstar.
9
Building a Multi-Asset +5Moz WesternAustralian Gold Producer ASX : BTR NORTH AMERICAN CONFERENCE PRESENTATION -SEPTEMBER 2026
1
Important Notices & Disclaimers Important Notices •Thispresentation(Presentation)hasbeenpreparedbyBrightstarandhasbeenauthorisedforreleasebytheBoardofDirectorsofBrightstaronthebasisitistobereadinconjunctionwiththeseimportantnoticesanddisclaimers. •ThisPresentationdated28September2026hasbeenpreparedbythemanagementofBrightstarResourcesLimited(ACN100727491)(“B ”,“Brightstar”or“ ompany”). Disclaimer •ThisPresentationhasbeenpreparedbyBrightstarbasedoninformationfromitsownandthird-partysourcesandisnotadisclosuredocument.NopartyotherthanBrightstarhasauthorisedorcausedtheissue,lodgement,submission, despatchorprovisionofthisPresentation,ortakesanyresponsibilityfor,ormakesorpurportstomakeanystatements,representationsorundertakingsinthisPresentation.Exceptforanyliabilitythatcannotbeexcludedbylaw,Brightstar anditsrespectiverelatedbodiescorporate,directors,employees,advisersandagentsdisclaimandacceptnoresponsibilityorliabilityforanyexpenses,losses,damagesorcostsincurredbyanypartyrelatinginanywaytothisPresentation including,reliancewithoutlimitation,theinformationcontainedinorprovidedinconnectionwithit,anyerrorsoromissionsfromithowevercaused,lackofaccuracy,completeness,currencyorreliabilityoryouoranyotherpersonplacinganyon thisPresentation,itsaccuracy,completeness,currencyorreliability. •ThisPresentationisnotaprospectus,disclosuredocumentorotherofferingdocumentunderAustralianlaworunderanyotherlaw.Itisprovidedforinformationpurposesandisnotaninvitationnorofferofsharesorrecommendationfor subscription,purchaseorsaleinanyjurisdiction.ThisPresentationdoesnotpurporttocontainalltheinformationthataprospectiveinvestormayrequireinconnectionwithanypotentialinvestmentinBrightstar.Eachrecipientmust makeitsownindependentassessmentofBrightstarbeforemakinganinvestmentdecision. Forward-Looking Statements •ThisPresentationcontainscertain"forward-lookingstatements".Thewords"expect","anticipate","estimate","intend","believe","guidance","should","could","may","will","predict","plan"andothersimilarexpressionsareintendedtoidentify forward-lookingstatements.Indicationsof,andguidanceon,futurefinancialpositionorperformancearealsoforward-lookingstatements.Forward-lookingstatements,opinionsandestimatesprovidedinthisPresentationarebasedon assumptionsandcontingencieswhicharesubjecttochangewithoutnoticeandinvolveknownandunknownrisksandcertaintiesandotherfactorswhicharebeyondthecontrolofBrightstaranditsdirectorsandmanagement.Forward-looking statementsareprovidedasageneralguideonlyandshouldnotberelieduponasanindicationorguaranteeoffutureperformance.Actualresults,performanceorachievementsmaydiffermateriallyfromthoseexpressedorimpliedinsuch statementsandanyprojectionsandassumptiononwhichthesestatementsarebased.ThesestatementsmayassumethesuccessofBrightstarbusinessstrategies.Thesuccessofanyofthosestrategieswillberealisedintheperiodforwhich theforward-lookingstatementmayhavebeenpreparedorotherwise.Readersarecautionednottoplaceunduerelianceonforward-lookingstatements,particularlyinlightofthecurrenteconomicclimateandthesignificantvolatility,andexcept asrequiredbylaworregulation,noneofBrightstarortheirrespectiverepresentativesoradvisersassumesanyobligationtoupdatetheseforward-lookingstatements.Norepresentationorwarranty,expressorimplied,ismadeastothe accuracy,likelihoodofachievementorreasonablenessofanyforecasts,prospects,orstatementsinrelationtofuturematterscontainedinthisPresentation.Theforward-lookingstatementsarebasedoninformationavailabletoBrightstarasat thedateofthisPresentation.Exceptasrequiredbylaworregulation(includingtheASXListingRules),noneofBrightstarandtheirrespectiverepresentativesoradvisersundertakesanyobligationtoprovideanyadditionalorupdatedinformation whetherasaresultofachangeinexpectationsorassumptions,newinformation,futureevents,orresultsorotherwise.Indicationsof,andguidanceoroutlookonfuturefinancialpositionorperformancearealsoforward-lookingstatements. Aspirational Statements •ThestatementswhichmayappearinthisPresentationregardingtheaspirationsforBrightstartoundertakeconstructionofaSandstoneprocessingplantin2H’ Y27forfirstgoldproductionin2H’ Y28,aligningwithcontinuedplannedproduction growthfromBrightstar’sLavertonandMenzieshubstoaspirationallytargetGroupproductionprofileof+200kozp.a.by2029,areaspirationalstatements.ThesestatementsarenotproductiontargetsasBrightstardoesnotyethavesufficient objectivereasonablegroundstobelievethatthestatementscanbeachieved. •Importantly,thestatementsareconsideredaspirationalbecause,asdisclosedinitsASXannouncementdated30April2025titled‘ andstonegoldprojectacceleratingtowardsdevelopment’(April2025Announcement),Brightstarhasnotyet completedapre-feasibilitystudyforSandstone,notingthatSandstonehasalongoperatinghistorywithdetailedinformationavailableonhistoricalperformanceacrossthemajorityofdeposits,oremineralisationstylesandoperatingparameters (i.e.openpitminingandconventionalcarbon-in-leachprocessingconductedintherecentpast).Whilepreliminaryassessmentshavebeenundertaken,asdisclosedintheApril2025Announcement,substantialfurtherworkisrequiredbefore BrightstarwillbeinapositiontohavesufficientobjectivereasonablegroundstopublishproductiontargetsorforecastfinancialinformationrelatingtotheSandstoneProject. •Thestudywillneedtoconsideranumberofvariablesandfocusareaswhichareexpectedtoinclude,butarenotlimitedtoitemswithinthefollowingfeasibilitystudyworkstreams:preparingrobustupdateMineralResourceEstimatesforeach depositbasedongeologicalmodelsgeneratedbyexistingandnewgeologicalinformationinformedbyBrightstar’scurrentdrillingprograms;applyingcurrent(CY26)miningcostandoperationalparameterstodelineateeconomicmining optimisations,openpitminedesignsandschedulesthatencapsulatesgeotechnicalandmetallurgicalrecoveryinformationfromthirdpartytestwork;assessmentsintoapprovalsandpermittingprocesses,alongwithdetailedengineeringdesign work,optimalprocessingflowsheetsandrequisiteinfrastructurethatdeliversthebestoutcomeofrecoveredmetal,operatingcostsandcapitalcostswhichsupportstheseaspirations. •BrightstarconfirmsthattheinclusionofAspirationalStatementsinthispresentationarebasedentirelyontheAprilAnnouncementandcontainsnonewinformation. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 2
Important Notices & Disclaimers Not Investment Advice •EachrecipientofthePresentationshouldmakeitsownenquiriesandinvestigationsregardingallinformationinthisPresentationincludingbutnotlimitedtotheassumptions,uncertaintiesandcontingencieswhichmayaffectfutureoperationsof Brightstarandtheimpactthatdifferentfutureoutcomesmighthave.InformationinthisPresentationisnotintendedtoberelieduponasadvicetoinvestorsorpotentialinvestorsandhasbeenpreparedwithouttakingaccountofanyperson’s individualinvestmentobjectives,financialsituationorparticularneeds.Beforemakinganinvestmentdecision,prospectiveinvestorsshouldconsidertheappropriatenessoftheinformationhavingregardtotheirowninvestmentobjectives, financialsituationandneedsandseeklegal,accountingandtaxationadviceappropriatetotheirjurisdiction.Brightstararenotlicensedtoprovidefinancialproductadviceinrespectoftheirsecurities. Feasibility Study -Cautionary Statement Goldfields ProjectFeasibility Study •The production targets and forecast financial information disclosed in this presentation were first announced in accordance withA X isting ules 5.16 and 5.17 in the ompany’s announcement ‘ pdated Goldfields Feasibility tudy” dated 29 January 2026. •Unless otherwise stated, the Company confirms that all material assumptions underpinning the production targets and forecast financial information derived from the production targets in the original DFS release 1 continue to apply and have not materially changed. •The Company cautions that a portion of the production target (27%) is based on Inferred Mineral Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production targets themselves will be realised. Production Target •The Production Target (and forecast financial information derived from the Production Target) referred to in this announcement is underpinned by Measured and Indicated Mineral Resources of approximately 73% and Inferred Mineral Resources of approximately 27% over the DFS period. •The total Life of Mine Production Target includes 27% Inferred Resources, 3% Indicated Resource outside of Reserve and the remaining 70% is underpinned by Proven and Probable Ore Reserves. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the Production Target itself (or the forecast financial information) will be realised. Competent Persons Statements •The Mineral Resources and Ore Reserves estimates disclosed in this Presentation were first disclosed in accordance with ASX Listing Rules 5.8 and 5.9 in the announcements as cross-referenced. Brightstar confirms that it is not aware of any new information or data that materially affects the information included in the relevant announcement and that all material assumptions and technical parameters underpinning the estimates in the previous announcements continue to apply and have not materially changed. Currency •Unlessotherwisestated,alldollarvaluesinthisPresentationarereportedinAustraliandollars. Compliance Statement –Production Target / Forecast Financial Information •Brightstar’s production target/forecast financial information referred to in this announcement was first disclosed in the ompany's announcement titled 'Updated Goldfields Feasibility Study' released on ASX on 29 January 2026. The Company confirms that allmaterial assumptions underpinning the production target and forecast financial information contained in the original announcement ‘ pdated GoldfieldsFeasibility tudy’ continue to apply and have not materially changed. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 3
INVESTMENT HIGHLIGHTS 5.2Moz –WA Gold developer executing on major production growth Two large-scale production centresto unlock Brightstar's TARGET200 strategy¹
- Refer to the Aspirational Statements disclaimer on page 2.
- Refer to Appendices 2-4 for Mineral Resource estimates and Ore Reserve statement.
- Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026.
- Assuming A$6,000/oz. Financial metrics are presented on a pre-tax basis -as at 31 December 2025, Brightstar had $209M of Group tax losses which are anticipated to be utilisedfor minimisingultimate tax expense.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
MAJOR PRODUCTION GROWTH²
•5.2Moz Mineral Resources on granted Mining Leases
•Immediate production growth at Goldfields with Sandstone to deliver scale
•Targeting to be a TOP 10 AUSTRALIAN GOLD PRODUCER
1
4
COMPELLING NEAR-TERM GOLDFIELDS DEVELOPMENT³
•6-year plan averaging 75koz p.a.
•New 1.5Mtpa CIL plant under construction upgradeable to 2.5Mtpa
•First gold targeted June 2027
2
GOLDFIELDS HUB -MATERIAL FREE CASH FLOW³ ⁴
•Pre-tax NPV $606M | Pre-tax IRR 74% | Average FCF $163M p.a.
•Cash generation from Goldfields to contribute to Sandstone delivery •Material LOM extension opportunities within existing Resource base 3 SANDSTONE -A POTENTIAL TIER-1 DEVELOPMENT² •Targeted to deliver distinct scale, long-life production centre •MRE of 3.6Moz @ 1.4g/t Au with two upgrades before end of CY26 •FINAL INVESTMENT DECISION targeted early CY28 4
BOARD OF DIRECTORS Richard Crookes Non-Executive Chairman Alex Rovira Managing Director Andrew Rich Executive Director - Operations Jonathan Downes Non-Executive Director RESEARCH COVERAGE 2 1.Refer to cash based as at June2026 per Quarterly Activities/Appendix 5B Cash Flow Report (30 July2026). Share price as at 25 September2026. Monthly liquidity based on last six trading months sourced from IRESS. 2.Please see Research notes available on Brightstar Website for Disclaimers and Disclosures. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer HNW/Retail 40% Institutional 46% S tr ategics & M ining Industry 12% B o a r d/M a n a g e m e n t 2% SHARE PRICE $0.59 (AUD) at 25September 2026 REVENUE PROTECTION 60koz Put options @ A$5,809/oz MARKET CAP $648M 1,108M shares on issue ENTERPRISE VALUE $526M EV / Resource: $102/oz CASH 1 $122M As per JunQ’26 quarterly MINERAL RESOURCES 5.2Moz 110Mt at 1.5g/t Au AVAILABLE, UNDRAWN DEBT US$120M Nordic Bond AVG MONTHLY LIQUIDITY ~$90M 6-month average liquidity SHARE PRICE PERFORMANCE SHAREHOLDERS 5
5 10 15 20 25 30 35 40 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Jun-24Aug-24Oct-24Dec-24Feb-25Apr-25Jun-25Aug-25Oct-25Dec-25Feb-26Apr-26Jun-26Aug-26 Volume (m shares) Share Price ($/share) VolumeClose Price CORPORATE SNAPSHOT Team & funding in place –platform for major production growth
Sandstone Project Emerging district-scale Western Australian gold development
Visible Gold in Two Mile Hill diamond core (TMHRCD26020)
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 7 Platform is set for value creation & project de-risking SANDSTONE PROJECT The Sandstone Value Proposition Emerging district-scale WA gold development opportunity
- Refer to Appendix 3 for Sandstone Mineral Resource estimates. District-scaleGranted Mining Leases Tier 1 jurisdiction+90% metallurgical recoveries Brownfield plant site Critical mass for a major mining centre Current MRE: 3.6Moz @ 1.4g/t Au, 1.5Moz Indicated 1 CATALYSTS Sep 2026 Two Mile Hill Resource upgrade Interim Mineral Resource upgrade Follows recent exploration success Sep -Nov 2026 Drilling assays Two Mile Hill Bull Oak Indomitable Nov -Dec 2026 Sandstone PFS Maiden Ore Reserve Global Sandstone MRE upgrade (including further TMH upgrade) Ongoing Growth Major extensional and greenfields programs Sandstone DFS How big could Sandstone be?
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 8 SANDSTONE PROJECT Critical Mass for development Existing Mineral Resource of 3.6MozAu provides critical mass for PFS evaluation and future development 1 Scale for development delivered: ▸Current Mineral Resource provides sufficient scale for feasibility studies, permitting/approvals and a pathway to Sandstone development 2 Robust technical work de-risks development: ▸Brightstar technical strategy to date has focused on improving the quality of the Mineral Resource to de-risk future development oSandstone MRE grew~0.7Moz in recent upgrade to 3.6Moz Au oIncludes 1.5Moz @ 1.5g/t Au in Measured & Indicated category ▸Final PFS-infill programs focused on further keyexistingdeposits for M&I growth: Bull Oak + Indomitable Camp + TMH-Shillington oTogether host +2Moz in Inferred Resources –targeted for further material conversion to M&Ifor inclusion in the PFS 3 Platform set for material growth: Exploration strategy developing in parallel with the PFS ▸Significant exploration potential for ongoing discoveries and MRE growth
1.Refer to ASX announcement ‘Sandstone gold project accelerating towards development’ dated 30 April 2025 and ‘Strategic Plan to Unlock Sandstone” dated 27 January 2026. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 9 SANDSTONE PROJECT Delivering on a district-scale opportunity Emerging district-scale WA gold development opportunity Calendar Year202620272028 Quarter MarQJunQSepQDecQMarQJunQSepQDecQMarQJunQSepQDecQ Drilling Infill Drilling Growth & Greenfields Studies Geotechnical Testwork Metallurgical Testwork Processing Plant Pre-Feasibility Study (PFS) Permitting & Approvals Definitive Feasibility Study (DFS) Execution Funding Final Investment Decision (FID) SEPTEMBER 2026 MRE upgrade TMH MRE upgradeGlobal MRE upgradeGlobal MRE upgrade Commence construction PFS and Maiden Reserve Definitive Feasibility Study Final Investment Decision MilestoneCompleted
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 10 SANDSTONE PROJECT Major Discoveryat Depth Two Mile Hill Significance of discovery confirmed by interim September 2026 MRE upgrade ahead of further group MRE upgrade in December 2026 1 DISCOVERY AT DEPTH: THE ‘SHIRVINGTON ZONE’ Material upside to the current Two Mile Hill Mineral Resource ▸Mineralised tonalite 400m to 500m thickin both completed deep holes ▸Frequent visible goldthroughout the drill holes ▸Significant depth extensionof the interpreted Two Mile Hill deposit 2 INFILL CONFIRMS WIDTH AND GRADE Up-dip infill drilling returned significant widths and grades ▸225.7m @ 3.11g/t Aufrom 284m (TMHRCD26006A) ▸194m @ 2.10g/t Aufrom 286m (TMHRCD26004) ▸Current TMH-Shillington MRE of 1.45Moz @ 1.8g/t Au 3 PIPELINE OF ANALOGOUS INTRUSIVE TARGETS Exploration strategy developing in parallel with the PFS ▸Up to ten analogous felsic intrusivesidentified in geophysics ▸Never systematically exploredand largely undrilled ▸Bull Oak and TMH intrusives host two of the Sandstone belt’s largest deposits
SANDSTONE PROJECT Interim Two Mile Hill MRE Upgrade Two Mile Hill MRE doubles to 1.45Moz @ 1.8g/tAu 01,0002,0003,0004,0005,0006,0007,000 5 105 205 305 405 505 605 705 805 905 Contained ounces per vertical metre (oz/vm) Vertical depth below surface (m) TMH-Shillington Ounces per Vertical Metre (OVM) Two Mile HillShillingtonTarget Zone TARGET ZONE Deposit Cut-off (g/t Au) IndicatedInferredTotal ktg/t Aukozktg/t Aukozktg/t Aukoz Two Mile Hill open pit0.42,2521.2873080.992,5601.296 Two Mile Hill underground0.736,0691.936213,6202.190219,6882.01,264 Two Mile Hill0.4/0.738,3201.744913,9282.091122,2481.91,360 Shillington0.42,0931.2772511.192,3431.186 Total0.4/0.7310,4131.652614,1792.092024,5921.81,446
Goldfields Project Pathway to +75koz p.a. –Construction underway | First gold June 2027
1.5Mtpa Laverton Plant Construction
13 GOLDFIELDS PROJECT 1.5Mtpa Laverton Plant advancing on schedule
Refer to Appendices 2-4 for Mineral Resource estimates and Ore Reserve statement. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 1 SIMPLIFIED BUSINESS MODEL Staged open pit and underground operations ▸Operating model:One OP provides base-load, one UG delivers high-grades ▸Own processing infrastructure–value realisation via hub-and-spoke model ▸Underpinned by 5+ years of owner-operator experience 14 GOLDFIELDS PROJECT De-risked development pathway –nine months to first gold 1.5Mtpa processing plant under construction to unlock existing 1.6Moz @ 1.6g/t Au Mineral Resource 2 LIFE-OF-MINE PRODUCTION UNDERPINNED BY THREE PITS ~1Moz @ 1.4g/t Au in three open pits ▸+70% of Goldfields gold production delivered from three OP mines ▸Each pit carries a 2–3 year mine life with extension upside ▸Mining commences at Lord Byron in late CY26 3 DEVELOPMENT ACTIVITIES RAMPING UP Processing plant site established and construction underway ▸170-person Lord Byron-Fish camp already in operation ▸ALLmine sources have previously been mined and processed ▸Mill construction underway -first gold targeted in JunQ’27
▸Conventional 1.5Mtpa CIL plant with embedded engineering for expansion to 2.5Mtpa during operations ▸Lump-sum, fixed-price EPC delivery model selected for construction of new processing infrastructure ▸Preferred gas-fired power pathway delivers de-risked energy source ▸LOM average processing cost of A$31/t processed 2 ▸Plant design based on consolidated metallurgical parameters -delivering LOM average recoveries of 91% 2 ▸FID declared and construction activities commenced in JunQ’26 INITIAL CAPACITY 1.5Mtpa Delivering 75koz p.a. EXPANSION UPSIDE 2.5Mtpa Pre-engineered for upside optionality LOM RECOVERY 91% Recovering 457koz Au over 6 yr LOM 1.Refer ASX announcement “Laverton Mill Construction Advancing on Schedule”’ dated 9 September 2026. 2.Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Laverton Processing Plant –1.5Mtpa design render LOM UNIT COST $31/t Per tonneprocessed 15 GOLDFIELDS PROJECT 1.5Mtpa Laverton Plant advancing on schedule 1 Fixed-price EPC contract de-risks the construction phase
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 16 GOLDFIELDS PROJECT Gold pouring in nine months First Gold targeted in June 2027 Calendar Year20262027 Quarter MarQJunQSepQDecQMarQJunQSepQDecQ Studies & Funding Goldfields DFS 2.0 Funding Execution Final Investment Decision (FID) Approvals MDCP Plant Approval Works Approval Construction 170-person Camp Upgrades 1.5Mtpa Processing Plant Gold production EPC Contract Power, Water & Site NPI Potential 2.5Mtpa Expansion Construction Mining Lord Byron Site Establishment Lord Byron Open Pit Mining Operations Fish Underground Mining Operations Yunndaga Underground Site Establishment Yunndaga Underground Mining Operations SEPTEMBER 2026FIRST GOLD: JUNE 2027 PotentialCompleted
PRE-TAX NPV₈
$606M
A$6,000/oz
PRE-TAX IRR
74%
NPV/Capex ratio 3.2x
LOM FREE CASH FLOW
~$1.0B
Over 6 years, undiscounted
LOM GOLD PRODUCED
457koz
Over 6 years
AVERAGE PRODUCTION
2
~75koz p.a.
1.5Mtpa Processing Plant in Laverton
GROUP AISC
3
$2,998/oz
C1 cash cost $2,581/oz
SENSITIVITY TO GOLD PRICE -A$/oz
METRIC (A$M)$5,500/oz$6,000/oz$6,500/oz$7,000/oz$7,500/oz
Pre-tax NPV₈($M)
5
4546067589111,063
Pre-tax IRR (%)
5
587490106121
Annual FCF ($M)126163200236273
LOM FCF ($M)7589771,1971,4171,637
1.Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026.
2.1.5Mtpa design capacity based on 100% fresh rock throughput; plant design has embedded optionality for expansion to 2.5Mtpa.
3.C1 cash cost includes mining opex, haulage, processing and G&A costs. AISC = C1 cash costs plus sustaining capital + royalties -both based on gold ounces produced at A$6,000/oz.
4.Payback period calculated from the first month of gold production after mill commissioning.
5.Pre-tax basis -as at 31 December 2025, Brightstar had $209M of Group tax losses available.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
17
GOLDFIELDS PROJECT
DFS2.0 economics demonstrates a robust development case
1
A high-margin, short-payback development with demonstrable mine life extension opportunities
Brightstar's Market Position An unparalleled opportunity
Lady Shenton Open Pit
1.Refer to Appendices 6 for references.
2.As at 25September 2026 -sourced from S&P CapIQ.
3.Goldfields DFS 2.0 onlyand excludes upcoming Sandstone PFS due for release in DecQ’26.
4.Pro-forma post 4 Sep 2026 completion. $310m placement received, $210m paid to RMS, includes listed investments.
5.Includes stated capacity at Lake Johnsons and Edna May combined.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
19
Brightstar
Resources
Limited
EMERGING PRODUCER PEERSESTABLISHED PRODUCER PEERSEXPLORER / DEVELOPER PEERS
Black CatForrestaniaPantoro GoldOra BandaCatalyst MetalsMinerals 260Rox Resources
Goldfields &
Sandstone
Kalgoorlie &
Paulsens
Edna May NorsemanDavyhurstPlutonicBullabullingYouanmi
CORPORATE
2
Market Cap ($M)6487337421,1462,9911,5532,327864
Enterprise Value ($M)5266286109232,7231,2222,116711
Net Cash ($M)122105132
4
223268331211153
MINERAL RESOURCES
Resource (koz)5,1732,5242,0784,6013,6904,5006,2002,195
Grade (g/t)1.52.71.13.32.03.31.05.5
Measured (koz)52574837499---
Indicated (koz)2,2101,2699941,8981,7263,4004,4001,606
Inferred (koz)2,9111,1991,0362,3271,8708001,700588
ORE RESERVES & STUDY
Mine TypeO/P & U/G
3
O/P & U/GO/P & UGO/P & U/GO/P & U/GO/P & U/GO/PU/G
Reserve (koz)351
3
3305188596101,5002,500727
Grade (g/t)1.6
3
2.41.12.12.32.60.94.7
Plant Size (Mtpa)1.5
3
1.26.1
5
1.21.22.051.0
Production (koz/yr)75
3
91-98133104--
VALUATION
EV/Production ($/oz)-6,878-9,465
20,47411,750
EV/Resource ($/oz)102249294201 738272 341324 EV/Reserve oz ($/oz)1,499 3 1,9021,1781,074 4,464815 846979 Undemanding valuation on every resource and reserve metric¹ B GH A ’ A K P N
- Refer to Appendix 8 for references. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 20 AZY: Minyari Dome BC8: Kal East/Coyote/Paulsens HRN: Gum Creek MRT: Kalgoorlie BTR: Goldfields/Sandstone MI6: Bullabulling STN: Apollo Hill AAR: Mandilla GG8: Nth Kalgoorlie / Vivien 1.5 2.5 3.5 4.5 5.5 6.5 0.00.51.01.52.02.53.03.54.04.5 Resource (Moz) Grade (g/t Au) ASX WA Gold Developers —Resource vs Grade (Bubble = Relative EV, A$M) 0.2Moz 0.5Moz 0.6Moz 1.0Moz 2.3Moz 0.3Moz 0.5Moz 0.9Moz 2.0Moz 2.9Moz 0.5Moz 1.0Moz 1.5Moz 3.0Moz 5.2Moz Jun-22Jun-23Jun-24Jun-25Sep-26 Brightstar's Global MRE Growth M&IInferred B GH A ’ A K P N A robust platform to build a mid-tier Western Australian gold miner A successful track record in M&A combined with aggressive exploration has placed Brightstar at the top end of the advanced developers and emerging producers with genuine multi-asset production scale potential
91 98 104 108 133 142 160 170 215 280 285 365 380 405 050100150200250300350400450 Annualised Production (kozp.a.)¹ TARGET200 puts BTR into Mid- Tier scale ▸Few other junior companies have a project pipeline that rivals Brightstar ▸Execution of TARGET200 strategy positions BTR alongside established mid-tier producers and could establish Brightstar as a TOP 10 AUSTRALIAN PRODUCER 1.Refer to Appendix 7 for references Bold company namesare those companies presented on a FY27 guidance basis (mid point where a range is provided) and Italiccompanies are actual FY26 production where no guidance has been sourced. . BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer MID-TIER OPPORTUNITY 1,575 695 Pantoro Black Cat Emerald Catalyst Capricorn Bellevue Ora Banda Alkane Ramelius Genesis Westgold Regis Evolution Northern Star Greatland 21 Vault B GH A ’ A K P N Limited mid-tier producers with scale of >200koz p.a. M&A has diminished the pipeline of emerging producers with +200koz p.a. production potential
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 1 GOLDFIELDS DEVELOPMENT ▸Simplified business model: 1x open pit & 1x underground + BTR-owned infrastructure ▸First gold targeted JunQ’27 ▸LOM Free Cash Flow $1.0B 1 over 6 years 2 SANDSTONE TO DELIVER SCALE ▸Additional MRE upgrade due late CY26 ▸PFS due late CY26 ▸DFS and FID due late CY27 / early CY28 ▸Targeting long-life, low cost “ ier 1 status” project 3 EXPERIENCED TEAM ▸Deep WA gold mine-building & operating experience ▸Proven project execution capability leveraging +5 years of owner-operate inhouse capability ▸GR Engineering appointed to construct Laverton plant 4 DRILL, DRILL, DRILL ▸+100,000m drilling programs planned CY26 –drilling transitions from infill to GROWTH ▸Exploration to target Resource growth and quality ▸4-6 rig drilling throughout CY26 5 CAPTURING VALUE ▸Undemanding Reserve / Production comparable metrics ▸Significant potential to re-rate as multi-mine developer line with producer peers ▸EV/Resource ~$102/oz vs peer median ~$300/oz 6 COMMUNITY ENGAGEMENT ▸Strong Native Title, local Shires, pastoralist relationships ▸Advanced Native Title Agreement negotiations ▸ESG strategy aligned with responsible gold production 22 SUMMARY Platform set for sustained growth Advancing a multi-hub production growth -Tier-1 jurisdiction, 5.2Moz Au on granted Mining Licenses
Appendices
Montague Open Pit
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 24 B O A R D O F D I R E C T O R SM A N A G E M E N T T E A M Richard Crookes Geologist · Finance · 35+ yrs Non-Executive Chairman •Managing Partner, Lionhead Resources; ex-Investment Director, EMR Capital & ED, Macquarie Metals & Energy Capital •NE Chairman, Black Rock Mining (ASX:BKT); former Chief Geologist & Mining Manager, Ernest Henry Mining Alex Rovira Geologist · Finance · 14+ yrs Managing Director •MD of Brightstar since January 2023; BSc (Geology & Env. Science), BCom (IB & Corporate Finance) •14+ years' executive leadership & investment banking at Canaccord Genuity across ECM and M&A in metals & mining Andrew Rich Mining Engineer · 15+ yrs Executive Director –Operations •Leads Brightstar's operations; delivery of WA gold projects at Linden, Ramelius & Westgold •BEng (WASM) & WA First Class Mine Manager's Certificate; NED of Javelin Minerals (ASX:JAV) Jonathan Downes Geologist · 25+ yrs Non-Executive Director •Gold & base metals expertise spanning exploration through to production •Managing Director, Dundas Minerals (ASX:DUN); NED of Cazaly Resources (ASX:CAZ) Nicky Martin Finance · CPA · 20+ yrs Chief Financial Officer •7 years at Pilbara Minerals (ASX:PLS), latterly Head of Finance —through Pilgangoora financing, construction & ramp-up into the ASX50 •Deep experience across finance, accounting, offtake, hedging, tax & treasury Daniel Jolley Mechanical Engineer · 20+ yrs Project Director •Processing plant delivery expertise, most recently Northern Star / De Grey Mining's 10Mtpa Hemi Gold Project •Leading Laverton plant execution & Sandstone engineering; prior delivery roles with Mineral Resources & FMG Samuel Main Corporate Development · 12+ yrs Corporate Development Officer •Expertise in financing, capital markets, organic & inorganic growth and investor relations •12+ years' experience across capital markets and M&A Jonathan Gough Geologist · 15+ yrs General Manager –Geology •Proven WA gold geology executive across production, resource definition & exploration •Ex-Exploration Manager, Musgrave Minerals —pivotal to the Cue Gold Project prior to the Ramelius takeover Katherine Hughes Human Resources · 15+ yrs Chief Human Resources Officer •Strategic HR, industrial relations & transformation across mining, manufacturing and transport •Leads people strategy, culture & leadership capability supporting Brightstar's growth Brendan Bow Environment & Approvals · 20+ yrs Environment & Approvals Manager •WA mining environmental, approvals, heritage & land access professional •Leading approvals, permitting & compliance across the Goldfields & Sandstone developments Julie Budrey Health & Safety · 25+ yrs Group Health & Safety Manager •Proven record building safety performance & workforce culture across WA mining operations •Ex-Group HSET Manager, Emeco Holdings; ex-Group OHS Manager, Westgold Resources Jasmin Mackoski Organisational Capability · 20+ yrs Chief Strategy & Performance Officer •20+ yrs governance, transformation & operational excellence across mining, resources & government •Leads enterprise performance to scale Brightstar's operating model LEADERSHIP Experienced team in place to execute
5
75
78
79
77
76
67
0
20
40
60
80
FY27FY28FY29FY30FY31FY32FY33
Gold (koz)
Group Production (koz)
1.Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026.
2.Diluted mined grade.
3.Gross revenue less royalties. Some variances may occur due to rounding.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Goldfields DFS 2.0UnitLavertonMenziesTotal
Key Production Outcomes²
Open Pit Mining
Orekt4,8933,0147,906
Grade²g/t Au1.41.61.5
Contained ounceskoz226150377
Operating Strip ratiow:o9.211.710.2
Underground Mining
Orekt8786351,513
Grade²g/t Au2.72.62.6
Contained ounceskoz7652128
Consolidated Operations
Orekt5,7713,6499,419
Grade²g/t Au1.61.71.7
Contained ounceskoz302203505
M&I contribution%69%80%73%
Processing
Ore processedkt9,4199,419
Feed grade²g/t Au1.71.7
Contained ounceskoz505505
Recovery%91%91%
Ounces producedkoz457457
$977m
AVERAGE GOLDFIELDS DFS 2.0 PRODUCTION
+75 kozp.a.
1.5Mtpa Laverton Plant
3
(400)
(200)
200 400 600 800 1,000 FY26FY27FY28FY29FY30FY31FY32FY33 Cash flow ( A$m ) Pre-tax Project FCF –(A$6,000/oz) Mining capexMining opexNet revenueCum. Free cash flow (pre-tax) 25 GOLDFIELDS PROJECT +75koz p.a. from a consolidated Laverton processing strategy 1 Yielding ~$1.0B of pre-tax free cash flow² at A$6,000/oz over a six-year mine life
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Oblique view of the Lord Byron open
pit design with Mineral Resource
block model (coloured by grade)
Recent exploration at Lord Byron
(looking NW) with existing Lord Byron
open pits in the background
LORD BYRON OPEN PIT
JORC Mineral Resource of 5.4Mt @ 1.5g/t Au for 267koz Au
1
Fully approved for mining operations to commence
Two small historic open pits coalesce into one, large open pit mine
2.5 year mine lifebased on current open pit mining inventory
Mining to commence DecQ’26
Processing physicals and costs
2
:
•Mining 2.5Mt @ 1.4g/t Au for 112koz Au mined
•92koz Au recovered(82% recovery)
•Average operating strip ratio of 8:1
•C1 Cash Cost: $2,491/oz
•AISC Cost: $2,878/oz
3
Ore Reserves: 1.8Mt @ 1.4g/t Au for 83koz
4
ocated ~50km from Brightstar’s processing facility along established haul
routes
Open down dip and along strike to the South –near term drilling focused on
shallow mine life extensions to the South
Targeting commencement of mining operations and stockpiling from DecQ’26
in advance of Brightstar’s processing plant commissioning
1.Refer to Appendix 2 for Goldfields Mineral Resources.
2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026.
3.Assumes A$6,000/oz.
4.Refer to Appendix 4 for Ore Reserve statement.
26
GOLDFIELDS PROJECT
Lord Byron Open Pit
LAVERTON MINE Cork Tree Well Open Pit BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer CORK TREE WELL OPEN PIT JORC Mineral Resource of 6.5Mt @ 1.4g/t Au for 292koz Au 1 Mining to commence 2030 2.5 year mine lifebased on current open pit design Processing physicals and costs 2 : •Mining 2.4Mt @ 1.5g/t Au for 114koz Au mined •108koz Au recovered (95% recovery) •Average operating strip ratio of 10:1 •C1 Cash Cost: $2,411/oz •AISC Cost: $2,813/oz 3 Ore Reserves: 2.1Mt @ 1.5g/t Au for 104koz 4 Open at depth and along strike -significant exploration upside to grow Resources on underexplored tenure ocated ~75km from Brightstar’s processing facility along established haul routes Oblique view of the Cork Tree Well open pit designs with Mineral Resource block model (coloured by grade) Aerial view of historic CTW open pits (looking south) 1.Refer to Appendix 2 for Goldfields Mineral Resources. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Assumes A$6,000/oz. 4.Refer to Appendix 4 for Ore Reserve statement. 27
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LADY SHENTON OPEN PIT JORC Mineral Resource of 8.1Mt @ 1.4g/t Au for 352koz Au 1 Fully approved for mining operations to commence Mining to commence 2H’CY28 ~3 year mine lifebased on current open pit mining inventory On-going exploration to assess potential for underground operations following open pit mining Processing physicals and costs 2 : •Mining 2.7Mt @ 1.5g/t Au for 132koz Au mined •121koz Au recovered(91% recovery) •Average operating strip ratio of 11:1 •C1 Cash Cost: $2,959/oz •AISC Cost: $3,516/oz 3 Ore Reserves: 2.4Mt @ 1.5g/t Au for 117koz 4 Open at depth and along strike -significant exploration upside to grow Mineral Resources on underexplored tenure 1.Refer to Appendix 2 for Goldfields Mineral Resources. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Assumes A$6,000/oz. 4.Refer to Appendix 4 for Ore Reserve statement. Oblique view of the Lady Shenton open pit designs with Mineral Resource block model (coloured by grade) Aerial view into the historic Lady Shenton open pit (looking south) 28 GOLDFIELDS PROJECT Lady Shenton Open Pit
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer YUNNDAGA UNDERGROUND et to be Brightstar’s next underground mine JORC Mineral Resource of 3.1Mt @ 2.1g/t Au for 206koz Au 1 (inclusive of lower grade halo) Mining to commence SepQ’27 Significant advantage utilising existing underground equipment, infrastructure and personnel from current underground operations 2 year mine lifebased on current underground mining plan Processing physicals and costs 2 : •Mining 0.6Mt @ 2.6g/t Au for 52koz mined •50koz Au recovered(~92% recovery) •C1 Cash Cost: $3,291/oz •AISC Cost: $3,441/oz 3 Ore Reserves: 0.5Mt @ 2.7 g/t Au for 47koz 4 Open at depth with significant scope for Mineral Resource growth and mine life extension Standard WA underground open stope, retreat mining methodology utilising conventional underground mining equipment Oblique view of the Yunndaga underground mine design with Mineral Resource block model (coloured by grade) Aerial view into the historic Yunndaga open pit (looking north) 1.Refer to Appendix 2 for Goldfields Mineral Resources. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Assumes A$6,000/oz. 4.Refer to Appendix 4 for Ore Reserve statement. 29 GOLDFIELDS PROJECT Yunndaga Underground
BTR TransactionNon-BTR Transaction BTR M&A Weighted Average¹: A$42/oz Non-BTR M&A Average: A$236/oz Note 1: Weighted average based on all BTR M&A transactions. Refer to Appendix 5 for details on transaction multiples. MineralResource estimates presented above are standalone target Mineral Resources (not proforma). 29 / 35 BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 867664642568 324 317 282 253 219 207 204 176 160 125 93 88 80 73 71 68 66 64 62 48 42 40 31 24 16 0 200 400 Feb-25Mar-25May-25Feb-20Jul-26Jun-26Aug-26Feb-26Jun-21Dec-24Jul-23Jun-23May-25Nov-20Feb-25Dec-23Jul-25Jan-25Dec-25Mar-24Jan-23May-25Jul-25Dec-21Aug-24May-20Mar-23Aug-24Dec-22 EV / Resource ounce (A$/oz) 30 Feb-25Mar-25May-25Feb-20Jul-26Jun-26Aug-26Feb-26Jun-21Dec-24Jul-23Jun-23May-25Nov-20Feb-25Dec-23Jul-25Jan-25Dec-25Mar-24Jan-23May-25Jul-25Dec-21Aug-24May-20Mar-23Aug-24Dec-22 Target MatsaSpartanGold RoadSpectrumVault Edna May Project AusgoldMagneticFirefly De GreyMusgraveStrickland Old Highway Project NTM GoldMaximus Kin Mining Warriedar Bulla- bulling Project Mt Henry- Selene Gold Linden Gold Vango Mining Laverton (Focus) Project Aurumin Bardoc Gold Alto Metals Alt Breaker Montague East Project Kingwest Acquiror Anglo Gold Ramelius Gold Fields RameliusGenesis Forrest- ania Oceana Gold GenesisGascoyne Northern Star Ramelius Northern Star Catalyst Metals Dacian Gold Astral Genesis Capricorn Metals Minerals 260 AlicantoBrightstar Catalyst Metals GenesisBrightstarSt BarbaraBrightstarAurenneRameliusBrightstarBrightstar Enterprise Value (A$M) 8122,0942,6002023,960300689606432,815189613385315416416765246625059146442353128 Mineral Resource (koz) 9363,1524,05035612,2319452,4432,40019613,5849273462066793356102,0502,3009153511,0023,9009513,0731,0465711,684507505 APPENDIX Appendix 1: Brightstar’s Impressive M&A Track Record Comparable transactions for Western Australian pre-production gold assets -acquisition cost, A$/ounce
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LAVERTONCut-offMeasuredIndicatedInferredTotal g/t Auktg/t Aukozktg/t Aukozktg/t Aukozktg/t Aukoz Alpha0.5---3711.9221,0282.8921,3992.5115 Beta0.53451.7195761.6299611.7541,8821.7102 Cork Tree Well0.5---3,2641.61663,1981.21266,4621.4292 Lord Byron0.53111.7172,1041.51052,9741.51455,3891.5267 Fish1.6255.441994.5291533.2163764.049 Gilt Key0.5---152.211531.361681.38 Second Fortune (UG)2.52415.3123413.7153411.7139213.440 Total –Laverton7052.3526,5631.73678,5011.745215,7681.7873 MENZIESCut-offMeasuredIndicatedInferredTotal g/t Auktg/t Aukozktg/t Aukozktg/t Aukozktg/t Aukoz Lady Shenton System0.5/1.2---3,7251.41684,3491.31848,0741.4352 Yunndaga0.5/1.2---2,1722.21529231.8543,0952.1206 Aspacia0.5---1371.771,2381.6621,3751.670 Lady Harriet System0.5---5201.3225901.1211,1101.2243 Link Zone0.5---1601.377401.0238901.09 Selkirk0.5---306.361401.251702.112 Lady Irene0.5------1001.761001.76 Total –Menzies---6,7441.73628,0801.435514,8141.5718 This Presentation contains references to Brightstar’s JORC Mineral Resources, extracted from the ASX announcements titled “Maiden Link Zone Mineral Resource Estimate –Amended” dated 15 November 2023, “Cork Tree Mineral Resource Upgrade Delivers 1Moz GroupMRE” dated 23 June 2023 and “Auralia Review” dated 10 September 2020, and ASX announcements for KingwestResources Limited titled, "High grade drilling results and high grade resource estimation from the Menzies Goldfield” dated 13 December 2022, "Menzies JORC gold resources surpass 500,000 ounces" dated 26 April 2022, “Robust Mineral Resource upgrades at Laverton and Menzies ahead of DFS delivery underpins future mining operations” dated 19 May 2025, “Menzies Mineral Resources Increases 22% to 0.7Moz” dated 11 December 2025 and “Drilling results and Mineral Resource upgrade at Lord Byron” dated 1 January 2026. This Presentation contains references to Linden’s JORC (2012) Mineral Resources, as reported in the announcement released by Brightstar on 25 March 2024 titled “Brightstar makes Recommended Takeover Offer for Linden Gold Alliance Limited”. 31 APPENDIX Appendix 2: Goldfields Mineral Resources
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LocationCut-offMeasuredIndicatedInferredTotal g/t Auktg/t Aukozktg/t Aukozktg/t Aukozktg/t AuKoz Montague-Evermore0.4---1,6832.11143,1221.31274,8051.6241 Whistler0.4---1,2582.0795651.4251,8231.8105 Achilles / Airport0.4---2,1301.3904,2551.01346,3851.1224 Duplex0.4------1,0030.9301,0030.930 Julias (Attributable)0.4---1,2581.2495560.8151,8141.164 Lord Nelson0.4---4,4411.52151,7581.1646,1991.4279 Lord Henry0.4---1,5231.6768831.4402,4061.5116 Vanguard Camp0.4---1,6162.21152,1941.3903,8091.7205 Havilah Camp0.4------1,3591.2541,3591.254 Indomitable Camp0.4---2,0991.2818,7721.028410,8711.0366 Bull Oak0.4/0.8---1,4810.9449,0561.027810,5371.0322 Two Mile Hill / Shillington0.4/0.73---10,4131.652614,1792.092024,5921.81,446 McIntyre0.4---5131.220770.925891.223 Plum Pudding0.4---4981.017520.915501.018 Central Trend (Eureka, Wirraminna, Old Town, Twin Shafts, Goat Farm, McClaren) 0.5---1,4801.1531,1311.1392,6121.191 Total ---30,3921.51,48148,9611.32,10479,3541.43,583 This Presentation contains references to Brightstar’s JORC Mineral Resources, extracted from the ASX announcements titled “Brightstar to drive consolidation of Sandstone Gold District” dated 1 August 2024, “Scheme Booklet Registered by ASIC” dated14October 2024, “Brightstar Pursues Synergistic Consolidation at Sandstone” dated 21 July 2025 , “Scheme Booklet Registered by ASIC” dated 9 October 2025, “Sandstone MineralResource Grows to 2.9Moz” dated 15 July 2026 and “Sandstone Resource Grows to 3.6Moz, Group MRE to 5.2Moz” dated 28 September 2026. 32 APPENDIX Appendix 3: Sandstone Mineral Resources
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LocationProvedProbableTotal Goldfields Ore Reserves 1 ktg/t Aukozktg/t Aukozktg/t Aukoz Cork Tree Well Open Pit (Laverton)---2,1371.51042,1371.5104 Lord Byron Open Pit (Laverton)3081.6151,5301.4681,8381.483 Lady Shenton Open Pit (Menzies)---2,3951.51172,3951.5117 Yunndaga Underground (Menzies)---5392.7475392.747 Total3081.6156,6011.63356,9091.6351 The references in this presentation to Brightstar’s Ore Reserve estimates were reported in accordance with Listing Rule 5.9 in the following announcements: (a): “Maiden Underground Ore Reserves Underpins FY26 Production” dated 26 June 2025, (b)“Menzies andLaverton Gold Project Feasibility Study” dated 30 June 2025 and (c) “Updated Goldfields Feasibility Study” dated 29 January 2026”, Brightstar confirms that the material assumptions and technical parameters disclosed in the announcement continue to apply and have not materially changed. Brightstar confirms that it is not aware of any new information or data that materially affects the information included in the previous market announcements and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. 33 APPENDIX Appendix 4: Ore Reserves
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer AcquirorTargetProject StageAnn. Date Enterprise Value¹ (A$m) Mineral Resource (kozAu) Resource Multiple (A$/oz Au) ASX Release Title AngloGoldMatsaResourcesFeasibility StudyFeb-25812936867Matsaand AngloGold Ashanti Execute A$101 Million Deal Lake Carey Gold Project RameliusResourcesSpartan ResourcesResource DevelopmentMar-252,0943,152664Transformation Combination of Ramelius& Spartan Gold FieldsGold RoadProductionMay-252,6004,050642 Gold Fields enters into binding agreement to acquire Gold Road Resources and withdrawal of cautionary announcement Ramelius ResourcesSpectrum MetalsResource DevelopmentFeb-20202356568RameliusMakes Recommended Takeover Offer for Spectrum Metals Genesis MineralsVault MineralsProductionJul-263,96012,231324Genesis and Vault to Merge Forrestania Resources LimitedEdna May Gold Project Resource DevelopmentJun-26300945317Acquisition of Edna May Gold Project Oceana Gold CorporationAusgold LimitedDefinitive Feasibility StudyAug-266892,443282OceanaGold Acquisition of Ausgold Genesis MineralsMagnetic ResourcesDefinitive Feasibility StudyFeb-266062,400253Presentation -Magnetic Attraction Gascoyne ResourcesFirefly ResourcesResource DevelopmentNov-2143196219Merger of Gascoyne Resources and Firefly Resources Northern StarDe Grey MiningDefinitive Feasibility StudyDec-242,81513,584207Northern Star agrees to acquire De Grey Ramelius ResourcesMusgrave MineralsPre-Feasibility StudyJul-23189927204Recommended Takeover Offer for Musgrave Minerals Ltd Northern StarStrickland MineralsResource DevelopmentJun-2361346176Sale of Millrose Project for $61m to Northern Star Resources Catalyst MetalsOld Highway ProjectResource DevelopmentMay-2533206160Catalyst acquires Old Highway gold deposit Dacian GoldNTM GoldResource DevelopmentNov-2085679125Strategic Merger of Dacian Gold and NTM Gold Astral ResourcesMaximus ResourcesResource DevelopmentFeb-253133593 Astral Resources and Maximus Resources to Merge via Recommended Takeover Offer Genesis MineralsKin MiningResource DevelopmentDec-235461088Reporting on select Kin Mining gold projects 14/1/23 Capricorn MetalsWarriedar ResourcesResource DevelopmentJul-251642,05080Capricorn Metals to acquire WarriedarResources Minerals 260BullabullingProjectResource DevelopmentJan-251672,30073 Transformational acquisition of the 2.3Moz BullabullingGold Project in WA, one of Australia's largest undeveloped gold projects Alicanto Minerals LimitedMt Henry-Selene GoldResource DevelopmentDec-256591571Mt Henry-Selene Gold Project Divested for $64.6M Brightstar ResourcesLinden GoldResource DevelopmentMar-242435168Brightstar makes recommended takeover offer for Linden Gold Alliance Limited Catalyst MetalsVango MiningDefinitive Feasibility StudyJan-23661,00266Bidders Statement -Catalyst Recommended Takeover for Vango Genesis MineralsLaverton (Focus) ProjectResource DevelopmentMay-252503,90064Acquisition of the Laverton Gold Project Brightstar ResourcesAuruminResource DevelopmentJul-255995162Strategic Acquisition of AuruminConsolidates Sandstone St BarbaraBardoc GoldOptimisation StudyDec-211463,07348St Barbara to acquire BardocGold via Recommended Scheme of Arrangement Brightstar ResourcesAlto MetalsResource DevelopmentAug-2444104642Brightstar to drive consolidation of Sandstone district AurenneAlt ResourcesPre-Feasibility StudyAug-202357140Alt Receives All Cash Off Market Bid from Private Equity Firm AurenneGroup RameliusResourcesBreaker ResourcesResource DevelopmentMar-23531,68431RameliusMakes Recommended Takeover Offer for Breaker Res NL Brightstar ResourcesMontague East ProjectResource DevelopmentAug-241250724Brightstar to drive consolidation of Sandstone district Brightstar ResourcesKingwestResourcesResource DevelopmentDec-22850516 Brightstar and KingwestResources agree strategic merger to unlock significant potential value for shareholders 1.Enterprise values sourced CapIQon the date of the transaction announcement 34 APPENDIX Appendix 5: Comparable Transaction Data
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer TickerCompanyStage Proved (koz) Probable (koz) Total Reserve (koz) Grade (g/t) Plant Capacity (Mtpa) Production (koz/year) Source & Date Market Cap ($M) Enterprise Value ($M) EV/ Resource ($/oz) EV/ Reserve ($/oz) EV/ Production ($/oz) BTRBrightstar ResourcesOperations & DFS153353511.61.523 Quarterly Activities/Appendix 5B Cash Flow Report (30 July 2026) 6485261021,49923,338 BC8Black Cat SyndicateOperations143173302.41.291 FY26 Financial Results (31 August 2026) 7336282491,9026,878 FRSForrestania ResourcesPFS-5185181.16.1- June 2026 Quarterly Activity Report & Appendix 5B (28 July 2026) 742610294-- PNRPantoroGoldOperations1796808592.11.298 Quarterly Activities/Appendix 5B Cash Flow Report(30 July 2026) 1,1469232011,0749,465 OBMOra BandaOperations495606102.31.2155 June 2026 Quarterly Activities Report (16 July 2026) 2,9912,7237384,46420,474 CYLCatalyst MetalsOperations-1,5001,5002.62.0104 Quarterly Activities Report -June 2026 (31 July 2026) 1,5531,22227281511,750 MI6Minerals260PFS-2,5002,5000.95- June 2026 Quarterly Activities and Cashflow Report(30 July 2026) 2,3272,116341846- RXLRox ResourcesDFS-7277274.71- Quarterly Activities/Appendix 5B Cash Flow Report (22 July 2026) 864711324979- CodeCompanyStageMeasured (koz)Indicated (koz)Inferred (koz)Total resourceGrade (g/t)Source Date BTRBrightstar ResourcesOperations & DFS522,2102,9115,1731.5Two Mile Hill Mineral Resources Doubles To 1.45Moz28-Sep-26 BC8Black Cat SyndicateOperations571,2691,1992,5242.7Trojan and Imperial Resources Increase to 286koz29-Jun-26 FRSForrestania ResourcesPFS489941,0362,0781.1Total Mineral Resource Estimate Surpasses 2Moz Au7-Sep-26 PNRPantoroGoldOperations3741,8982,3274,6013.3Annual Mineral Resource and Ore Reserve Statement22-Sep-25 OBMOra BandaOperations991,7261,8703,6902.0Annual Mineral Resource and Ore Reserve Statement14-Jul-26 CYLCatalyst MetalsOperations-3,4008004,5003.3 Putting meat on the bones of Catalyst's path to 200,000oz annual gold production 4-Aug-25 MI6Minerals260PFS-4,4001,7006,2001.0BullabullingResource Increases to 6.2Moz8-Jul-26 RXLRox ResourcesDFS-1,6065882,1955.5Annual Mineral Resource and Ore Reserve Statement9-Sep-26 1.Market capitalisations and enterprise values as at 25 September2026 and June2026 Quarterly cash and debt balances 35 APPENDIX Appendix 6: Peer Mineral Resource References¹
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer (g) = Annualisedproduction based on FY27 guidance midpoint–small variances may occur dur to rounding. (a) = Annualisedproduction based on FY26 actual production from published company disclosures –small variances may occur dur to rounding. TickerCompany Annualised Production (kozp.a.) Source & Date NSTNorthern Star Resources1,575 (g) FY26 Financial Results (20 August 2026) EVNEvolution Mining695 (g) FY26 Full Year Financial results and Final Dividend (19 August 2026) WGXWestgold405 (g) FY27 Guidance and Three-Year Outlook (9 September 2026) RRLRegis Resources380 (g) Full Year Results Presentation (21 August 2026) VAUVault Minerals365 (g) FY26 Financial Results Summary (20 August 2026) GMDGenesis Minerals 285 (g) FY26 results (20 August 2026) GGPGreatland Resources280 (g) Greatland Annual Report (27 August 2026) RMSRamelius Resources215 (g) Four-Year Outlook and FY27 Guidance presentation (21 September 2026) ALKAlkane Resources170 (g) FY26 Financial Results and Dividend (21 August 2026) BGLBellevue Gold160 (g) Quarterly Activities Report (28 July 2026) CMMCapricorn Metals142 (g) Record FY Results and 5cps Fully Franked Final Dividend (27 August 2026) OBMOra Banda133 (g) 2026 Annual Report (26 August 2026) EMREmerald Resources108 (g) Annual Report and Appendix 4E (27 August 2026) CYLCatalyst Metals104 (a) Quarterly Activities Report -June 2026 (31 July 2026) PNRPantoroGold98 (g) FY2026 Result and FY2027 Guidance (9 July 2026) BC8Black Cat Syndicate91 (a) FY26 Financial Results (31 August 2026) 36 APPENDIX Appendix 7: Peer AnnualisedProduction References
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 37 TickerCompanyTotal Resource (koz) Grade (g/t) Source & Date Enterprise Value ($M) EV/ Resource ($/oz) MI6Minerals2606,2001.0June 2026 Quarterly Activities and Cashflow Report(30 July 2026)2,116341 AZYAntipaMinerals2,9001.3Quarterly Activities/Appendix 5B Cash Flow Report (29 July 2026)336116 STNSaturn Metals2,8300.5Quarterly Activities/Appendix 5B Cash Flow Report (31 July 2026)282100 BC8Black Cat Syndicate2,5242.7FY26 Financial Results (31 August 2026)628249 HRNHorizon Gold2,3001.9Quarterly Activities/Appendix 5B Cash Flow Report (30 July 2026)17978 AARAstral Resources2,0721.0Quarterly Activities/Appendix 5B Cash Flow Report (27 July 2026)260126 MRTMaritana Minerals2,1511.6Quarterly Activities Report (22 July 2026)5023 GG8Gorilla Gold Mines2,0004.0Quarterly Activities/Appendix 5B Cash Flow Report (31 July 2026)221110 1.Market capitalisations and enterprise values as at25September2026 and June2026 Quarterly cash and debt balances APPENDIX Appendix 8: Peer WA Gold Developers –Resource vs Grade¹
www.brightstarresources.com.au ACN 100 727 491 2026 ANNUAL REPORT
Contents
Corporate Directory 1 Chairman’s Letter to Shareholders 2 Directors’ Report 4 Remuneration Report 28 Auditor’s Independence Declaration 46 Consolidated Statement of Profit or Loss and Other Comprehensive Income 47 Consolidated Statement of Financial Position 48 Consolidated Statement of Changes in Equity 49 Consolidated Statement of Cash Flows 50 Notes to the Consolidated Financial Statements 51 Consolidated Entity Disclosure Statement 102 Directors' Declaration 103 Independent Auditor’s Report 104 Corporate Governance Statement 108 ASX Additional Information 109
- 1 -
CORPORATE DIRECTORY
Brightstar Resources Limited ABN 44 100 727 491 Incorporated in Australia
DIRECTORS Mr Richard Crookes Non-Executive Chairman Mr Alexander Rovira Managing Director Mr Andrew Rich Executive Director - Operations Mr Jonathan Downes Non-Executive Director Mr Ashley Fraser Non-Executive Director (Resigned 2 December 2025)
COMPANY SECRETARY Mr Benjamin Smith Company Secretary
PRINCIPAL REGISTERED OFFICE IN AUSTRALIA
Level 2, 36 Rowland Street
Subiaco WA 6008
Tel: +61 8 9481 0389
Fax: +61 8 9463 6103
Email: [email protected]
Website: www.brightstarresources.com.au
SHARE REGISTER Computershare Investor Services Pty Limited Level 17, 221 St Georges Terrace Perth WA 6000 Telephone: +61 8 9323 2000 Facsimile: +61 8 9323 2033
AUDITORS KPMG 235 St Georges Terrace Perth WA 6000
ASX CODE BTR
- 2 -
CHAIRMAN’S LETTER TO SHAREHOLDERS
Dear Shareholders,
It is my privilege to present the Annual Report for Brightstar Resources Limited for the year ended 30 June 2026 and reflect
upon what has been a defining year in the Company's evolution.
Twelve months ago, Brightstar had successfully transformed from an explorer into a growing gold producer and developer.
Today, I am pleased to report that we have taken another major step forward in executing our strategy to build a substantial,
long-life Western Australian gold company. Throughout FY2026, the Company continued to strengthen its project portfolio,
advance development activities across the Goldfields Hub, and materially enhance the scale and quality of our resource base.
Under the leadership of Managing Director Alex Rovira and our executive team, Brightstar transitioned from a period of
consolidating high-quality assets into a fully funded developer with a clear, accelerated pathway to becoming a multi-asset
Western Australian gold producer of genuine scale. The foundations laid in prior years including strategic regional
consolidation and the build out of a high-performing technical and executive team has delivered tangible progress across
every pillar.
Transforming the Goldfields Hub
The most significant milestone during the year was the advancement of our Goldfields development strategy. Following
completion of the original Definitive Feasibility Study (DFS) in FY2025, the Company delivered an updated Goldfields DFS in
January 2026, incorporating a larger 1.5Mtpa processing facility at Laverton, expanded Ore Reserves and a longer mine life.
The revised study demonstrated compelling economics – pre-tax free cash flow of A$1.0 billion, NPV₈ of A$606 million and
an IRR of 74% at a conservative A$6,000/oz gold price, supporting average production of more than 75koz per annum over
an initial six-year mine life. These numbers reinforced the Board's confidence that Brightstar possesses one of the most
attractive near-term gold development projects in Western Australia. All key regulatory approvals were secured, the Final
Investment Decision was taken in May 2026, and a A$110 million EPC contract was executed with GR Engineering Services.
Full-scale construction of the 1.5Mtpa Laverton processing plant is now underway, with first gold targeted for mid-2027.
The Board regards the commencement of construction as a watershed moment. It reflects years of work undertaken by our
team to consolidate, study and optimise the Menzies and Laverton assets into an integrated production hub capable of
generating substantial cash flow throughout future gold cycles.
Resource Growth and Sandstone Consolidation
Alongside development activities, Brightstar continued to strengthen its long-term growth pipeline through the advancement
of the Sandstone Hub.
The strategic consolidation of the Sandstone district has provided the Company with a district-scale gold opportunity
containing multiple deposits, extensive infrastructure advantages and significant exploration upside. During FY2026, intensive
drilling programs delivered encouraging results across the project area, supporting the Board's view that Sandstone has the
potential to become a second cornerstone production centre for the Company.
Resource growth remains central to our strategy. As we completed infill and extension drilling across several key deposits,
the quality and scale of our mineral inventory continued to improve. The work undertaken during the year establishes a strong
foundation for future reserve growth, development studies and production expansion opportunities. A full Pre-Feasibility Study
(PFS) is presently underway and will be completed in the coming year.
Strong Positioning in a Favourable Gold Market
FY2026 was characterised by a strong Australian dollar gold price environment, which continued to highlight the attractiveness
of quality Australian gold assets. Against this backdrop, Brightstar focused on positioning itself to maximise exposure to future
cash generation while maintaining financial discipline and development flexibility.
The updated Goldfields development plan demonstrated robust project economics across a range of gold price assumptions
and provides shareholders with significant leverage to continued strength in the gold market.
- 3 -
The Company's ability to secure project funding in a competitive market environment is a strong endorsement of the quality
of our asset base and the credibility of our development strategy.
Safety, Sustainability and Governance
While growth remains an important objective, we continue to place equal emphasis on safety, environmental responsibility
and sound corporate governance.
Safety remains non-negotiable. The Group recorded no Lost Time Injuries across mining, exploration and construction
activities, extending an unbroken record of more than 2,098 days. This outcome reflects the culture and professionalism of
our growing workforce and the priority placed on the wellbeing of every person who works with us.
As Brightstar enters a new phase of construction and project delivery, maintaining a strong safety culture will remain our
highest priority. We are committed to developing our operations responsibly, supporting local communities and ensuring that
our activities create lasting value for all stakeholders.
The Board also remains focused on maintaining high standards of governance and transparency as the Company grows in
scale and complexity.
Looking Ahead
The year ahead represents another exciting chapter for Brightstar.
Our immediate focus is the successful execution of the Laverton Plant construction program and the delivery of first gold
production, while continuing to unlock value across the Sandstone Hub through further drilling, resource growth and
completion of a PFS.
Brightstar now possesses a rare combination of attributes: a funded development project, substantial mineral resources,
district-scale exploration upside and a highly capable management team. We believe these characteristics position the
Company strongly to achieve its ambition of becoming a significant Western Australian mid-tier gold producer.
On behalf of the Board, I would like to thank our dedicated employees, contractors, traditional owners, local communities,
shareholders and business partners for their ongoing support throughout FY2026. I would also like to acknowledge the
exceptional dedication of the Brightstar executive team whose efforts have delivered another transformational year for the
Company. To our shareholders, thank you for your continued support and confidence in the Brightstar vision and I assure you
that the Board remains focused on disciplined delivery, responsible growth and the creation of enduring value for all
stakeholders.
We look forward to reporting further progress as Brightstar continues its journey of building a profitable, sustainable and
growing gold business.
Yours sincerely,
Richard Crookes Chairman Brightstar Resources Limited 3 September 2026
- 4 -
DIRECTORS’ REPORT
The Directors present their report together with the financial report of the consolidated entity consisting of Brightstar Resources Limited (“BTR”, “Brightstar” or “Company”) and its controlled entities (the Group) for the financial year ended 30 June 2026, and independent audit report thereon.
DIRECTORS The names of directors who held office during or since the end of the year and until the date of this report are as follows. Directors were in office for this entire period unless otherwise stated. The following information is current at the date of this report:
Name, qualifications and
independence status
Experience, special responsibilities and other directorships
Mr Richard Crookes
BSc (Geology), Grad Dip Applied
Finance, MAusIMM, FCSI and MAICD
Non-Executive Chairman
Appointed 31 May 2024
Mr Crookes has over 35 years’ experience in the resources and
investments industries. He is a geologist by training having previously
worked as the Chief Geologist and Mining Manager of Ernest Henry Mining
in Australia.
Mr Crookes is Managing Partner of Lionhead Resources (a Critical
Minerals Investment Fund) and formerly an Investment Director at EMR
Capital. Prior to that he was an Executive Director in Macquarie Bank’s
Metals Energy Capital (MEC) division where he managed all aspects of the
bank’s principal investments in mining and metals companies.
Other current ASX directorships:
Black Rock Mining Ltd (since October 2017)
Former ASX directorships in the last three years:
Vital Metals Ltd (August 2022 – October 2025)
Lithium Power International Ltd (November 2018 - March 2024)
Special Responsibilities:
Member of Remuneration and Nomination Committee
Member of Audit and Risk Committee
Mr Alexander Rovira
BSc (Geology), BCom (CorpFin)
GradDipAppFin
Managing Director
Appointed 12 January 2023
Mr Rovira is an experienced corporate finance and geology professional.
Prior to joining the Company Mr Rovira worked as an investment banker for
nine years, focusing on the metals and mining sector.
Other current ASX directorships: Gwardar Resources Ltd (since July
2026)
Former ASX directorships in the last three years: None
Special Responsibilities:
Member of Remuneration and Nomination Committee (since 2 December
2025)
Member of Audit and Risk Committee (since 2 December 2025)
Mr Andrew Rich
B. Eng (Mining)
Executive Director - Operations
Appointed 31 May 2024
Mr Rich was the Managing Director of Linden Gold Alliance Ltd (Linden)
leading Linden’s business across mining and corporate functions. He has
over 15 years’ experience as a mining engineer and underground manager
across gold and nickel. He successfully led the delivery of three
underground mining projects through construction into production at
Westgold Resources Ltd, Ramelius Resources Ltd and Linden.
Other current ASX directorships: Javelin Minerals Ltd (since August
2024)
Former ASX directorships in the last three years: None
- 5 -
DIRECTORS’ REPORT
Mr Jonathan Downes
BSc (Geology), MAIG
Non-Executive Director
Appointed 26 May 2023
Mr Downes has over 25 years’ experience in the minerals industry and has
worked in various geological and corporate capacities. Experienced with
nickel, gold and base metals, he has also been intimately involved with the
exploration process, development through to production.
Other current ASX directorships:
Cazaly Resources Ltd (since November 2021); and
Dundas Minerals Limited (since October 2025)
Former ASX directorships in the last three years:
Kaiser Reef Limited (September 2019 – October 2025); and
Corazon Mining Limited (April 2006 - September 2023)
Special Responsibilities:
Chair of Remuneration and Nomination Committee
Chair of Audit and Risk Committee
Mr Ashley Fraser
B. Eng (Mining)
Non-Executive Director
Appointed 31 May 2024; Resigned 2
December 2025
Mr Fraser is an experienced mining and heavy industries executive with
over 30 years of mining engineering, operational and executive experience
in gold, copper, manganese and coal. He was the Executive Chairman of
Linden and founder of Orionstone Holdings Limited (now Emeco Holdings
Limited) and Blue Cap Mining (mining services and development company)
and Blue Capital Equities Pty Ltd as trustee for Blue Capital Trust No.2
(resources and private equity fund).
Mr Fraser was a member of the Remuneration and Nomination Committee
and the Audit and Risk Committee until his resignation effective December
2025.
Other current ASX directorships: None
Former ASX directorships in the last three years: None
- 6 -
DIRECTORS’ REPORT
COMPANY SECRETARY
Benjamin Smith
Company Secretary
Mr Smith is a Chartered Secretary and Chartered Accountant and has over ten years’ experience in finance, accounting and
corporate advisory. His experience includes three years at BHP’s Nickel West, and five years auditing ASX listed companies
prior to that. More recently he is serving as Company Secretary for ASX listed company Rubix Resources Limited and Estrella
Resources Limited.
DIRECTORS’ MEETINGS
The number of Board and Committee meetings attended by each Director of the Company during the financial year are:
Board Audit and Risk Committee (ARC) Remuneration and Nomination Committee (RNC) Director Meetings attended Eligible to attend Meetings attended Eligible to attend Meetings attended Eligible to attend Richard Crookes 11 11 4 4 2 2 Alex Rovira 1 11 11 3 3 1 1 Andrew Rich 2 11 11 - - - - Jonathan Downes 11 11 4 4 2 2 Ashley Fraser 3 3 3 1 1 1 1 1 Mr Rovira was appointed member of both the Audit and Risk Committee (ARC) and Remuneration and Nomination Committee (RNC) following Mr Fraser’s resignation 3 . Mr Rovira attended four ARC meetings held during the year, three of these were in his capacity as a member. He attended two RNC meetings, one of these was in his capacity as a member. 2 Notwithstanding he is not a member of the Audit and Risk Committee, Mr Rich attended four audit and risk committee meetings held during the year.
3 Mr Fraser resigned 2 December 2025.
The Audit and Risk Committee and the Remuneration and Nomination Committees comprises three Directors, including the Managing Director and two Non-Executive Directors. All Directors, whether a member or not, have a standing invitation to all Board Committee meetings.
PRINCIPAL ACTIVITIES
The principal activities of the Group during the financial year were mineral exploration, mining operations, mine development and the sale of gold in Western Australia.
- 7 -
DIRECTORS’ REPORT
REVIEW OF OPERATIONS
Brightstar is the 100% owner of the Goldfields Project and the Sandstone Project which cover several mining and exploration projects.
KEY HIGHLIGHTS • No Lost Time Injuries (LTIs) recorded across the Group during FY26, with mining, exploration and construction activities delivered safely. • Group mining production of 244.5kt @ 3.0g/t Au for ~24koz of contained gold from the Laverton underground operations (Second Fortune and Fish). • Completion of the Ore Purchase Agreement (OPA) with Genesis Minerals Limited (Genesis), with ~400kt @ 2.2g/t Au processed since commencement for ~24koz Au recovered, delivering A$138 million in gross sales proceeds. • Release of the Goldfields Definitive Feasibility Study (DFS 2.0) in January 2026, outlining production of +75koz p.a. over an initial six-year mine life, with pre-tax free cash flows of A$1.0 billion, NPV 8 of A$606 million and IRR of 74% at the assumed Base Case gold price of A$6,000/oz. • Final Investment Decision (FID) approved for the 100%-owned Goldfields Project in May 2026 following receipt of all key regulatory approvals, with the EPC contract executed with GR Engineering Services Limited (GRES) and full- scale construction of the 1.5Mtpa Laverton processing plant underway. • Completion of a A$193 million equity raising (A$175 million institutional placement and upsized A$18 million Share Purchase Plan) and a US$120 million Senior Secured Bond, delivering total available funding of more than A$380 million - funding the Goldfields Project to first gold and providing meaningful capital to advance Sandstone towards Final Investment Decision. • Strategic acquisition of Aurumin Limited (Aurumin) completed in December 2025, concluding Brightstar’s consolidation of the Sandstone district and delivering a consolidated total Mineral Resource Estimate of 2.4Moz in the Sandstone district. • Mineral Resource growth across the portfolio, including a 22% increase at Menzies and an upgraded Sandstone Mineral Resource of 2.9Moz @ 1.3g/t Au (announced post year-end), lifting total Group Mineral Resource to 100Mt @ 1.4g/t Au for 4.5Moz Au. • Sandstone Pre-Feasibility Study and maiden Ore Reserve on track for delivery in the December 2026 quarter, in parallel with a further growth-focused Mineral Resource update. • Post year-end, spectacular results from deep extensional drilling at Two Mile Hill-Shillington (Sandstone) headlined by 305.4m @ 1.82g/t Au from 351.9m (TMHRCD26020) tripling the interpreted thickness of the host tonalite intrusion at depth, ahead of a further Mineral Resource update targeted in the December 2026 quarter. • Gold price protection established through Put Options over 60koz of gold production for the first 24 months from FY27, exercisable at A$5,809/oz, with full exposure to gold price upside retained.
OPERATIONS
During FY26, Brightstar concluded the processing campaign under the OPA with Genesis, processing ~400kt @ 2.2g/t Au for
~24koz Au recovered across the OPA contract.
The Company advanced its two Laverton underground mines in accordance with the Goldfields’ FID strategy centred on the
commissioning of Brightstar-owned infrastructure - the 1.5Mtpa Laverton processing plant due to produce gold in mid-CY27.
Mining at the Fish underground mine was paused in March 2026, with the mine held in a state of operational readiness and
stoping scheduled to recommence in early CY27, in line with commissioning of the Laverton processing plant.
Mining continued at Second Fortune, where high-grade ore is being mined and stockpiled for future processing, with the mine
expected to be placed on care and maintenance in August 2026.
In May 2026, Brightstar approved the Final Investment Decision for its 100%-owned Goldfields Project, supported by a A$193 million equity raising and US$120 million senior secured bond. With all key approvals secured and a A$110 million EPC contract awarded to GR Engineering Services, construction of the Laverton plant commenced, with site establishment underway and first concrete poured before year-end.
- 8 -
DIRECTORS’ REPORT
Safety Brightstar has maintained an excellent safety record with no LTIs across the Group in 2,098 days to 30 June 2026.
People Brightstar’s workforce grew substantially during FY26 as the Company transitioned into construction of the Goldfields Project and expanded its owner-operator capabilities. Key appointments during the year included a Project Director, a Chief Human Resources Officer, a Group Health and Safety Manager and an Environment and Approvals Manager, strengthening project delivery and health, safety and environmental leadership across the business.
Environment, Heritage and Community The Group’s activities are subject to environmental regulation under applicable Commonwealth and Western Australian legislation. During FY26, environmental management focused on progressing the approvals and studies required to support development of Brightstar’s key projects, while maintaining environmental compliance across its existing operations and exploration activities. At the Laverton Plant site near Laverton, Brightstar secured key environmental and mining approvals to support project development, including approval of the Mining Development and Closure Proposal (MDCP) from the Department of Mines, Petroleum and Exploration (DMPE), and a Part V Works Approval from the Department of Water and Environmental Regulation (DWER). Environmental work also progressed in relation to groundwater supply, waste rock landforms, tailings storage, surface water management and rehabilitation of legacy mining areas. At Sandstone, environmental baseline studies and technical investigations continued to support the Project Pre-Feasibility Study and future environmental approvals. This included flora and fauna assessment, water, rehabilitation and closure planning, and environmental input into the design and location of proposed mining and supporting infrastructure. Brightstar acknowledges the Traditional Owners of the lands on which it explores and operates and is committed to protecting Aboriginal cultural heritage and building respectful, long-term relationships with Traditional Owners and local communities. During FY26, the Company continued heritage engagement and assessment activities across its Laverton, Menzies and Sandstone project areas. This included progressing heritage protection arrangements with relevant Traditional Owner groups, undertaking and reviewing heritage surveys and assessments to support proposed mining and exploration activities, and incorporating heritage considerations into project planning and approvals. Brightstar also continued engagement with local communities, pastoralists, government agencies and other stakeholders across the Laverton, Menzies and Sandstone districts as its projects progressed through exploration, feasibility, approvals and development.
- 9 -
DIRECTORS’ REPORT
GROUP PRODUCTION & SALES SUMMARY
Unit
Second
Fortune
Fish Lord Byron FY 2026
Mining operations
Development ore:
Ore mined kt 27.1 48.1 - 75.2
Grade mined g/t Au 3.19 2.45 - 2.72
Contained gold oz 2,777 3,790 - 6,567
Stope ore:
Ore mined kt 101.4 68.0 - 169.4
Grade mined g/t Au 3.05 3.38 - 3.18
Contained gold oz 9,940 7,386 - 17,326
Total ore mined:
Ore mined kt 128.4 116.1 - 244.5
Grade mined g/t Au 3.08 2.99 - 3.04
Contained gold oz 12,717 11,175 - 23,892
Metres advanced:
Operating m 1,423 698 - 2,121
Capital (drives) m 253 736 - 989
Capital (decline) m 318 540 - 858
Total metres advanced m 1,994 1,974 - 3,968
Sales
Ore sales:
Ore sold kt 95.9 100.7 46.0 242.6
Grade g/t Au 2.58 2.56 0.60 2.20
Contained gold oz 7,962 8,285 887 17,134
Recovery % 87% 81% 91% 84%
Recovered gold oz 6,893 6,719 807 14,419
Inventory (30 June 2026)
Stockpiles:
Ore kt 30.1 13.3 86.8 130.2
Grade g/t Au 3.09 2.93 1.00 1.74
Contained gold oz 2,983 1,252 3,026 7,261
Second Fortune Gold Mine
During FY26, Second Fortune mined a total of 128.4kt @ 3.08g/t Au for 12.7koz, comprised of:
• 27.1kt @ 3.19g/t Au of development ore, and
• 101.4kt @ 3.05g/t Au of stope ore.
Total development for the financial year was 1,994m, consisting of 318m of decline development, 253m of capital development
and 1,423m of operating development with only 203m of operating development in the June 2026 quarter ahead of the mine
being placed on care and maintenance from August 2026.
Following the mine plan changes related to DFS 2.0 in January 2026, the decline was advanced down to the 955 level and
capital development works ceased. Development ore driving continued on the 995 and 975 levels with stoping occurring on
the 1015 and 995 Levels.
Mining at Second Fortune is scheduled to cease during the September 2026 quarter under the current life-of-mine plan, with
the mine to be placed on care and maintenance from August 2026. All ore mined at Second Fortune since April 2026 is being
stockpiled for processing through Brightstar’s Laverton processing plant once commissioned in mid-CY27.
Second Fortune ended the financial year with a ROM stockpile of approximately 30.1kt @ 3.09g/t Au for 3.0koz, which will be
held on site ahead of haulage to Brightstar’s Laverton processing plant following its commissioning in mid-CY27.
- 10 -
DIRECTORS’ REPORT
Fish Underground Mine
During FY26, Fish mined a total of 116.1kt @ 2.99g/t Au for 11.2koz, comprised of:
• 48.1kt @ 2.45g/t Au of development ore, and
• 68.0kt @ 3.38g/t Au of stope ore.
The Fish mine commenced its ramp-up from construction during the financial year, achieving first stope production in August
2025 and reaching steady-state production, from Stage 1, in September 2025 under an owner-operator mining model. In
March 2026, mining at Fish was paused, with major mining operations ceasing and non-essential mobile equipment and
infrastructure demobilised from site. The mine has since been held in a state of operational readiness, positioning it to
recommence ore production in early CY27 and provide high-grade underground feed to Brightstar’s Laverton processing plant
following its commissioning in mid-CY27.
Total development for the financial year was 1,974m, consisting of 540m of decline development, 736m of capital development
and 698m of operating development. Decline and capital development focused on ‘Stage 2’ advance, with the mine advancing
25m vertically before ceasing ahead of transition to operational readiness.
Capital infrastructure works were completed during FY26, including upgrades to the primary pumping system, exploration
development drives and ventilation access. Ore development across the Stage 1 levels at 1350, 1330 and 1310 was
completed in the December 2025 quarter.
During the June 2026 quarter, preparations commenced for the underground diamond drilling program, including the
deployment of additional management resources to site and the setup of underground drill platforms. The 5,000m program
commenced in the first week of July 2026 and is designed to improve grade control data for the Stage 2 mine plan through
infill drilling, while also testing potential extensions at depth beneath the current mine plan through growth drilling.
The Fish ROM stockpile contains approximately 13.3kt @ 2.93g/t Au for 1.3koz available for immediate haulage on completion
of Brightstar’s Laverton processing plant.
Additionally, the 1350 level underground contains two drilled stoping panels and is set up for an immediate restart to mining
in CY27. The mine remains in a state of operational readiness, with limited care and maintenance costs owing to the minimal
water reporting to the underground and dewatering activities only required for two days during each month.
Processing
During FY26, the third, fourth and fifth ore processing campaigns were completed at Genesis’ Laverton mill under the OPA.
The third parcel processed in August 2025 (delivered between 21 May 2025 and 5 August 2025), achieved 52kt @ 2.68g/t
Au with 91.3% recovery for 4.1koz.
The fourth parcel processed in November 2025 (delivered between 6 August 2025 and 15 November 2025) achieved 83kt @
2.32g/t Au with 75% recovery for 4.7koz. The drop in recovery was related to an increase in the mineral Pyrrhotite, which
consumed oxygen in the leach circuit which was subsequently addressed in the fifth parcel through milling practises and ore
blending.
The fifth and final parcel comprised a record parcel size for the Company both in terms of tonnes processed and gold poured
with a total of ~138kt of ore processed, at a reconciled blended head grade of 2.0g/t Au, which recovered ~7.9koz Au at an
89.1% recovery.
Brightstar’s OPA with Genesis processed a total of ~400kt of ore @ 2.2g/t Au recovering ~24koz Au, which delivered A$138
million in gross sales proceeds.
The OPA enabled Brightstar to build out its ‘operational readiness’ in preparation for its gold production growth strategy in the
Goldfields district with OPA cash flows reinvested across the portfolio, particularly the build out of the Company’s Laverton
footprint to support larger scale mining operations as planned feed for Brightstar-owned processing infrastructure to leverage
its workforce and regional assets including camps, haul roads, workshops and other supporting infrastructure.
Goldfields Development Overview In January 2026, following a competitive Front-End Engineering and Design (FEED) process, Brightstar executed an Early Works Agreement (EWA) with GRES. The EWA enabled critical pre-FID activities to commence, including the procurement of long-lead equipment such as the SAG mill and variable speed drive, together with the continuation of detailed engineering and operational readiness activities. This established a pathway for the project to transition into full execution following Board approval. In May 2026, Brightstar’s Board of Directors approved FID for the development of the Company’s 100%-owned Goldfields Project in Western Australia. FID followed receipt of the remaining key regulatory approvals (as set out above in the Environment, Heritage and Community section). With these approvals in place, together with the execution of the Engineering, Procurement and Construction (EPC) contract with GRES, Brightstar transitioned from early works into full-scale construction of the new 1.5Mtpa Laverton processing plant.
- 11 -
DIRECTORS’ REPORT
Figure 1: Laverton Processing Plant - 1.5Mtpa design render
Following FID, Brightstar immediately accelerated the next phase of the Goldfields Project development, including:
• commencement of full-scale construction activities at the Laverton processing plant site in late May 2026;
• finalisation and execution of remaining construction, infrastructure and operational contracts, including the execution of the Power Purchase Agreement and LNG Supply Agreement post year-end;
• full mobilisation of project delivery teams and construction contractors;
• preparation for commencement of open pit mining at Lord Byron from late CY26 and the recommencement of stoping at the Fish underground mine in early CY27 (both located ~55km from the Laverton processing plant site); and
• ongoing operational readiness, recruitment and commissioning planning.
The Company remains focused on delivering the Goldfields Project safely, on schedule and within budget as it builds toward becoming a substantial mid-tier Western Australian gold producer.
- 12 -
DIRECTORS’ REPORT
Figure 2: Goldfields Execution Plan
Power Contracts
During the June 2026 quarter, commercial negotiations and documentation with Brightstar’s preferred supplier for the LNG
power solution for the Goldfields Project continued. Post year-end, Brightstar executed an integrated energy solution for the
Laverton processing plant, comprising a long-term Power Purchase Agreement with PWR Hybrid Solutions and a dedicated
LNG Supply Agreement with EVOL LNG, both portfolio companies of OCTA Group (OCTA).
The integrated solution combines contractor-owned gas-fired power generation, LNG storage, regasification and fuel supply
infrastructure under a coordinated energy platform. The LNG infrastructure includes three on-site LNG storage vessels and
associated facilities supporting long-term fuel supply security. The integrated structure is intended to reduce interface risk by
aligning fuel supply and power generation under a coordinated contractual framework.
- 13 -
DIRECTORS’ REPORT
Figure 3: Primary Crusher Wall and Foundations (July 2026)
Figure 4: Laverton Processing Plant site (July 2026)
- 14 -
DIRECTORS’ REPORT
Figure 5: Jasper Hills camp (July 2026)
Figure 6: CIL tank footings (July 2026)
- 15 -
DIRECTORS’ REPORT
Figure 7: Raw and Process Water Ponds and Earthworks Pads (July 2026) Studies
Goldfields DFS 2.0
On 29 January 2026, the Company released an updated Definitive Feasibility Study (DFS 2.0) for the Goldfields Project, comprising the Menzies and Laverton assets. DFS 2.0 reported significant improvements in the project metrics relative to the original DFS released in June 2025. The updated study incorporated enlarged Mineral Resources and a transition from the previous Menzies toll-milling strategy to a consolidated Laverton processing strategy, resulting in an improved production profile, mine life and project economics.
Key outcomes from DFS 2.0 included: • Undiscounted pre-tax free cash flow of A$1.0 billion, NPV 8 of A$606 million and IRR of 74%, based on an assumed Base Case gold price of A$6,000/oz;
• Pre-tax free cash flow of A$1.4 billion, NPV 8 of A$911 million and IRR of 106%, based on a spot gold price (at the time of release) of A$7,000/oz;
• Initial mine production of approximately 9.4Mt @ 1.7g/t Au for 457koz recovered over approximately six years;
• Base Case C1 Cash Costs of A$2,581/oz and All-In Sustaining Costs (AISC) of A$2,998/oz; and
• An increase in the planned processing plant throughput from 1.0Mtpa to 1.5Mtpa, supporting average gold production of +75koz p.a. The plant design provides the capability for a potential future expansion to 2.5Mtpa, while continued exploration of the existing Mineral Resources provides potential to extend the mine life. The updated Goldfields DFS 2.0 provides a strong platform for near-term development of +75koz p.a. of gold production with first gold targeted in June 2027.
- 16 -
DIRECTORS’ REPORT
Sandstone Gold Project In January 2026, Brightstar released its Strategic Plan to Unlock Sandstone, outlining a targeted two-year pathway to transform the updated 2.9Moz @ 1.3g/t Au Sandstone Project into a district-scale, long-life production centre. The Sandstone Strategic Plan positions the project as the next major growth driver for Brightstar following the development of the fully funded Goldfields Project, supporting the Company’s TARGET200 strategy of becoming a multi-asset +200koz p.a. Western Australian gold producer. A Maiden Ore Reserve and Pre-Feasibility Study (PFS) remain on schedule for delivery in the December 2026 quarter.
Sandstone Pre-Feasibility Study The Sandstone PFS commenced in the September 2025 quarter, with the December 2025 quarter focusing on open pit optimisation work and ongoing Mineral Resource Estimate updates. PFS workstreams progressed during the financial year and remain on track for completion in the December 2026 quarter. The PFS will include the declaration of a maiden Ore Reserve and assess an initial development scale with potential for future expansion. Brightstar is utilising numerous experienced contractors and consultants engaged on the Goldfields Project, providing workflow synergies, technical continuity and efficiencies across the Sandstone PFS. Engineering and design for the Sandstone processing plant commenced with GRES, focused on optimising plant throughput and capital efficiency, with the design incorporating embedded optionality for future expansion consistent with Brightstar’s development strategy for the Goldfields processing plant. Metallurgical testwork supporting the PFS is well advanced, with the metallurgical drilling program largely completed. Environmental, heritage and water studies progressed in support of statutory approvals, with heritage surveys undertaken across the Sandstone Project area and water exploration identifying multiple potential sources, including paleochannel and hard-rock aquifers. Studies of non-process infrastructure, access and haul roads, communications and accommodation are underway, with Sandstone benefiting from extensive existing infrastructure established through historical mining activity. Tailings Storage Facility design is nearing finalisation of a preferred location and construction methodology is well advanced, and geotechnical drilling and metallurgical sample collection for the PFS were completed during the year. Mine open pit optimisation, design and scheduling activities progressed throughout the year, with ongoing refinement of the proposed mining strategy and sequencing. Brightstar has established an experienced owner’s team to deliver the Goldfields and Sandstone projects sequentially, leveraging the experience, systems, intellectual property and delivery expertise developed through the Goldfields Project to enhance execution certainty and delivery efficiency.
Figure 8: Sandstone Execution Plan
- 17 -
DIRECTORS’ REPORT
Mineral Resources Upgrade
Sandstone The Mineral Resource Estimate (MRE) for the Sandstone Gold Project was upgraded to 2.9Moz @ 1.3g/t Au, as announced post year-end. Sandstone now hosts 69.3Mt @ 1.3g/t Au for 2.9Moz, with the Indicated-classified component totalling 1.1Moz @ 1.5g/t Au.
A key objective of this initial MRE update was to increase confidence in the resources under Brightstar’s stewardship. This is illustrated by the 113% increase in Indicated Mineral Resources within the higher confidence category. Additionally, this update also represents the application of Brightstar’s rigorous geological interpretation and robust estimation parameters to these deposits for the first time.
Against the prior estimate of 51.4Mt @ 1.5g/t Au for 2.44Moz, the total Sandstone MRE has increased by 18% and the Measured & Indicated classified MRE has increased by 113% to 1.1Moz @ 1.5g/t Au. Thereby increasing the Brightstar total group MRE to 100Mt @ 1.4g/t Au for 4.5Moz Au, which is a ~10x increase in total MRE in 3.5 years.
The upgraded MRE delivers the first key milestone of Brightstar’s Sandstone Strategic Plan, improving Mineral Resource quality while continuing organic growth. Infill and extensional drilling conducted at Sandstone in FY26 has resulted in MRE updates for key near-term development deposits at the Sandstone Hub, thus significantly improving the size and quality of the Mineral Resources.
Brightstar has executed a deliberate focus on improving geological confidence and resource classification rather than maximising headline MRE growth, with tighter geological controls and reinterpretation of mineralised domains resulting in a more robust and reliable model to de-risk the near-term development of the Sandstone Project.
The MRE incorporates drilling programs completed by Brightstar during 2025 and 2026. As these programs are ongoing, this estimate represents an interim milestone, illustrating the progress and increased geological confidence achieved to date. A revised MRE will follow later in CY26, prior to the release of the Sandstone PFS in the December 2026 quarter.
Laverton In late 2025, Brightstar completed 22 RC drill holes for ~2,000m of drilling across two modest drilling programs designed to infill and extend the southern extension of the Lord Byron deposit, located within the Goldfields Hub.
As a result of the RC drilling conducted, there was a 6% increase in the Total Mineral Resource to 5.4Mt @ 1.5g/t Au for 267koz and an 8% increase in Measured & Indicated Mineral Resources to 122koz @ 1.6g/t Au.
A key focus of the drilling was the conversion of shallow, oxide ounces from Inferred to Indicated to increase potential Ore Reserve ounces in this Southern lode for inclusion in the updated DFS 2.0 announced in January 2026.
Menzies During the first half of the financial year, infill and extensional drilling conducted at the Menzies Gold Project in 2025 resulted in MRE updates at the key Yunndaga and Lady Shenton deposits, significantly improving the quality of the Mineral Resources.
This MRE estimation process is the first time Yunndaga and Lady Shenton have been estimated in-house by Brightstar, with a focus on delivering robust Mineral Resources to underpin future mining operations.
The MRE for the Menzies Project was increased by 22% to 14.8Mt @ 1.5g/t Au for 718koz Au. Importantly, the key deposits of Lady Shenton and Yunndaga increased in size by 29% and 32%, respectively.
- 18 -
DIRECTORS’ REPORT
EXPLORATION Exploration during FY26 was focused on growing the Company’s Mineral Resources and improving resource confidence ahead of near-term development, with drilling directed primarily at the Sandstone Hub in support of the Sandstone PFS, complemented by resource definition and mine-life extension drilling across the Goldfields Hub (Laverton and Menzies). A summary of activity for each hub is set out below, with full details available in the Company’s Quarterly Activities Reports and ASX announcements. In total, 930 holes for 127km were drilled by Brightstar in the year, across aircore, reverse circulation and diamond core drilling.
Sandstone Hub
Following completion of the Aurumin acquisition, Brightstar operated up to six drill rigs across the Sandstone Hub during FY26
as part of an aggressive infill and extensional drilling campaign. Drilling was completed at the Two Mile Hill-Shillington, Bull
Oak, Vanguard, Indomitable Camp (including Musketeer and Indomitable East), Havilah and Lord Nelson deposits within the
Sandstone Project, and at the Montague-Boulder and Achilles deposits within the Montague Project. The programs were
primarily designed to upgrade Mineral Resource classification for inclusion in the Sandstone PFS, with diamond drilling also
providing structural, geotechnical and metallurgical data. In the June 2026 quarter alone, 154 holes were completed for
30,266m.
The campaign included Brightstar’s maiden diamond drilling programs at Sandstone, with visible gold intersected in numerous
drillholes - including multiple deep diamond holes at Two Mile Hill targeting areas up to 550m below surface that have been
highlighted as having significant potential for future underground mining.
Results from these programs were incorporated into the upgraded Sandstone Mineral Resource of 2.9Moz @ 1.3g/t Au
announced in July 2026 (refer to Mineral Resources Upgrade above), with a further growth-focused Mineral Resource update
targeted for the December 2026 quarter in parallel with the Sandstone PFS and maiden Ore Reserve. With the PFS infill
programs now substantially complete, exploration will increasingly shift toward extensional and growth targets across the
broader Sandstone district.
Post year-end, on 3 August 2026, Brightstar reported spectacular assay results from deep extensional and infill drilling at the Two Mile Hill-Shillington deposit (current Mineral Resource of 14.6Mt @ 1.6g/t Au for 731koz). Deep extensional drillhole TMHRCD26020 intersected a substantially wider tonalite than previously interpreted - tripling the interpreted horizontal thickness of the host intrusion to more than 180m - with visible gold observed throughout the mineralised tonalite and the hole ending in mineralisation at 657.3m. Results included: • TMHRCD26020: a broad, unconstrained intercept of 305.4m @ 1.82g/t Au from 351.9m, including 17.5m @ 9.68g/t Au from 351.9m (with 1.1m @ 103g/t Au from 362.9m), 13.4m @ 8.59g/t Au from 531m and 34.6m @ 4.11g/t Au from 586.7m (with 1.5m @ 46.7g/t Au from 618.2m) • Infill drilling from shallower zones: 205m @ 2.67g/t Au from 293m (TMHRCD26009), including 15m @ 18.5g/t Au from 293m (with 1m @ 265g/t Au from 302m) and 16m @ 7.59g/t Au from 326m; 197.7m @ 1.14g/t Au from 263.5m (TMHRCD26007); 116.6m @ 1.74g/t Au from 206m (TMHRCD26012); and 185.7m @ 1.03g/t Au from 249.7m (TMHRCD26010) • High-grade mineralisation in the adjacent BIF and basalt sequence, including 2.8m @ 74.1g/t Au from 235m (TMHRCD26015)
These results form a key input to the Two Mile Hill underground mining study being completed by Entech as part of the Sandstone PFS. Drilling is continuing with four rigs active at Sandstone, ahead of a further Mineral Resource update targeted in the December 2026 quarter.
Goldfields Hub (Laverton and Menzies)
At Laverton, extensional RC drilling at Lord Byron (22 holes for ~2,000m) targeted infill and southern extensions of the deposit,
supporting the January 2026 Mineral Resource upgrade and Ore Reserve conversion ahead of open pit mining commencing
in late CY26.
Regional RC drilling around the Second Fortune mine (29 holes for ~4,800m) tested the Linden Giant, Linden Star, Alawa
and May Prince prospects, while surface extensional drilling (8 holes for ~2,700m) and Phase 1 of an underground diamond
drilling program (~5,400m) at Fish targeted resource definition and extensions beneath the current mine plan in support of
the ‘Stage 2’ mine plan, identifying multiple potential parallel lodes at depth.
- 19 -
DIRECTORS’ REPORT
At Menzies, Phase 2 infill and extensional drilling at Yunndaga (31 holes for ~6,600m of RC and diamond drilling) provided resource, geotechnical and metallurgical data that underpinned the December 2025 Menzies Mineral Resource upgrade and the Yunndaga underground mine design incorporated in DFS 2.0. Significant intercepts reported during the year included: • Lord Byron: 32m @ 7.16g/t Au from 69m, including 11m @ 15.1g/t Au from 87m (LBRC25001); and 30m @ 3.02g/t Au from 44m (LBRC25005) • Second Fortune regional prospects: 10m @ 9.83g/t Au from 57m, including 1m @ 56.9g/t Au from 62m, at Linden Giant (SFRC25012); and 1m @ 53.8g/t Au from 83m at Alawa (SFRC25020) • Fish: 7.0m @ 3.31g/t Au from 141.6m and 9.9m @ 2.90g/t Au from 179.5m (FUDD002, underground); and 4.0m @ 2.42g/t Au from 544.0m (FHRCD25005C, surface) • Yunndaga (Menzies): 8m @ 6.67g/t Au from 245m, including 4m @ 10.6g/t Au from 249m (YNRC25053); and 7.0m @ 5.70g/t Au from 230m, including 0.6m @ 54.8g/t Au from 234.8m (YNRCD25040)
Underground diamond drilling at Fish recommenced in July 2026, targeting improved grade control data for the Stage 2 mine plan and testing for extensions at depth beneath the current mine plan.
CORPORATE
Acquisition of Aurumin Limited
On 2 December 2025 the Company completed its acquisition of Aurumin Limited (Aurumin) via a Share and Option Scheme
of Arrangement (together the Schemes). As part of the Schemes the Company issued 128.0 million Shares to Aurumin
shareholders (being one Brightstar Share for every four Aurumin Shares held) and 28.1 million Options to Aurumin Option
holders (being one new Brightstar Option for every four Aurumin Options held).
The acquisition of Aurumin further consolidates the Sandstone region following Brightstar’s acquisition in late 2024 of the
Sandstone Gold Project via the acquisition of Alto Metals Ltd and the Montague East Gold Project acquired from Gateway
Mining Ltd. Together these acquisitions represented a unique opportunity to de-risk and accelerate the development of the
emerging Sandstone Gold district, provide greater certainty for the development of new infrastructure in the region and unlock
exploration regional synergies.
Capital Raising
The Company completed two successful share placements during the year raising $242.5 million before costs. The first
placement raised $50 million (before costs) via the issue of 104.17 million shares at $0.48 per share on 25 July 2025 to fast-
track exploration and development activities at Sandstone following the acquisition of Aurumin.
During FY26, Brightstar successfully completed a strategic equity capital raising, fully funding the equity component of the
Goldfields Project development and providing substantial capital to advance the Sandstone Gold Project towards FID.
On 2 February 2026, the Company announced firm commitments to raise A$175 million before costs through a two-tranche
institutional placement to tier-one, long-only international and domestic institutional investors. The capital raising also included
a Share Purchase Plan (SPP), initially targeting approximately A$5 million at the same issue price as the institutional
placement.
The institutional placement received strong support and introduced several new, high-quality natural resources specialist
funds to Brightstar’s share register. The SPP also received significant demand from eligible retail shareholders, with
applications totalling approximately A$25.8 million. In response, the SPP was increased to A$18 million.
Together, the institutional placement and upsized SPP raised total gross proceeds of A$192.53 million as part of the broader
funding package for the Goldfields Project. The final transactions successfully settled on 18 March 2026, shares issued
totalled 385.0 million at $0.50 per share as part of the broader funding package.
- 20 -
DIRECTORS’ REPORT
Senior Secured Bond Issue In March 2026, Brightstar successfully completed a US$120 million Senior Secured Nordic Bond (Bond) issuance following strong demand from international institutional funds and natural resources specialist investors. The Bond settled on 18 March 2026 as part of the Company’s broader funding package. Together with the equity raising, Brightstar secured total available funding of more than A$380 million. The Bond has a 12.5% p.a. coupon and a four-year tenor, with no principal repayments required for the first 18 months. This is followed by a tiered amortisation profile and a 20% bullet repayment at maturity. The funds received on settlement of the Bond are required to be held in escrow bank accounts, with access to the cash restricted until pre-disbursement conditions precedent are satisfied. Upon satisfaction, the funds will be capable of drawdown, subject to an ongoing cost to complete test. The restricted cash balance at 30 June 2026 is $160.9 million (30 June 2025: Nil).
Operating Result The following table provides additional information on the Company’s result for the year ended 30 June 2026 and specifically reconciles the cash gross margin/(loss) 1 to the loss for the year.
1
The cash gross margin/(loss) is a non-IFRS measure that in the opinion of the Company’s directors provides useful information to assess
the financial performance of the Company over the reporting period. This non-IFRS measure is unaudited.
2
Operating cost of sales includes mining, inventory movements, haulage, royalties and site based general and administration costs.
During the year the Company generated a cash gross margin from operations of $18.6 million (30 June 2025: cash gross loss
of $0.6 million) from the sale of 14,419oz of gold at 2.2 g/t. Revenue from sales was lower than anticipated following lower
than anticipated recovery from processing of Parcel 4 following sub-optimal leaching levels achieved during the campaign.
Due to the impact of recoveries in this parcel, the net effect of this was underperformance of ~1,650 recovered ounces ($10.5
million lower revenue) based on the mined production and forecast metallurgical recoveries.
30-Jun-26 30-Jun-25 $'000 $'000 Revenue from contracts with customers 64,139 33,510 Operating cost of sales 2 (45,580) (34,087) Cash gross margin/(loss) 1 18,559 (577) Depreciation and amortisation (31,484) (6,091) Gross margin/(loss) (12,925) (6,668) Administration and other expense (12,257) (7,802) Exploration and feasibility studies expense (45,294) (19,123) Depreciation and amortisation expense (446) (278) Inventory write down
(7,378) Share based payment expense (1,778) (1,148) Business acquisition income/(expense) (269) 261 Care & maintenance (1,213)
Other income 137 1,958 Operating margin/(loss) before finance costs (74,045) (40,178) Finance income 2,692 473 Finance costs (5,258) (2,112) Revaluation of Financial Assets to Fair Value (319) (4,251) (Loss) after tax (76,930) (46,068)
- 21 -
DIRECTORS’ REPORT
During FY26, the Company incurred exploration and feasibility expenses of $45.3 million (30 June 2025: $19.1 million) including $14.3 million relating to the uplift of the rehabilitation provision associated with an exploration stage asset (30 June 2025: reduction to expenditure $0.3 million).
Cash and Liquidity
As at 30 June 2026, the Company has total cash and cash equivalents and restricted cash of $283 million (30 June 2025: $11.7 million) comprising of cash and cash equivalents of $122.0 million (30 June 2025: $11.7 million) and restricted cash of $160.9 million (30 June 2025: Nil).
During the year, the Company increased its cash balance by $110.3 million to $122.0 million (30 June 2025: increase in cash balance of $3.7 million to $11.7 million). Contributing to the movement in cash and cash equivalents during the period were cash inflows from financing activities of $202.0 million, cash used in operating activities of $33.9 million and cash used in investing activities of $57.8 million. Significant cash flows are shown in the graph below:
The Company’s revolving debt facility (US$11.5 million) with Ocean Partners was fully repaid during FY26.
Hedging During June 2026 the Company purchased put options over 60,000 ounces of gold at a strike price of $5,809/oz (US$4,000/oz) to be settled progressively over financial years ending 30 June 2028 and 30 June 2029.
Board Changes On 2 December 2025 Mr Ashley Fraser resigned as a Non-Executive Director of the Company to pursue other business interests in the mining sector.
- 22 -
DIRECTORS’ REPORT
Earn-In Arrangements
In February 2025, Brightstar signed a binding Term Sheet with Cazaly Resources Limited (Cazaly) under which Cazaly is
granted an option to elect to earn up to an 80% interest in the Goongarrie Gold Project by sole funding exploration expenditure
of up to $3 million.
In March 2025, Cazaly exercised this option, with the staged earn-in structure being:
• Cazaly to spend $1 million on expenditure over an initial 12-month period to earn a 25% interest;
• Cazaly to spend an additional $1 million on expenditure over a further 18-month period to earn an additional 26%
interest (aggregate 51% interest); and
• Cazaly to spend an additional $1 million on expenditure over a further 18-month period to earn an additional 29%
interest (aggregate 80% interest).
On 20 January 2026 Cazaly met the first expenditure milestone of $1 million expenditure earning a 25% interest in the
Goongarrie Gold Project. On 27 August 2026 Cazaly met the second expenditure milestone of a further $1 million earning a
further 26% interest, total expenditure is $2 million for a 51% interest.
OUTLOOK FY27 is expected to be a transformational year for Brightstar as construction of the Laverton processing plant advances toward first gold targeted in June 2027, open pit mining commences at Lord Byron from late CY26 and stoping recommences at the Fish underground mine in early CY27. At Sandstone, the PFS, maiden Ore Reserve and a further Mineral Resource update remain on track for the December 2026 quarter, supporting a targeted FID from CY27 as the Company advances its TARGET200 strategy toward becoming a substantial mid-tier Western Australian gold producer.
BRIGHTSTAR GLOBAL ORE RESERVE AT 30 JUNE 2026
Table 1: Brightstar Ore Reserve Summary (June 2026) Ore Reserve Category Proved Probable Total kt Au (g/t) koz kt Au (g/t) koz kt Au (g/t) koz Underground Yunndaga - Menzies - - - 539 2.7 47 539 2.7 47 Underground Sub-total - - - 539 2.7 47 539 2.7 47 Open Pit Lord Byron – Laverton 308 1.6 15 1,530 1.4 68 1,838 1.4 83 Cork Tree Well – Laverton - - - 2,137 1.5 104 2,137 1.5 104 Lady Shenton – Menzies - - - 2,395 1.5 117 2,395 1.5 117 Open Pit Sub-total 308 1.6 15 6,062 1.5 289 6,370 1.5 304 TOTAL: ORE RESERVES 308 1.6 15 6,601 1.6 336 6,909 1.6 351 Note 1: some rounding discrepancies may occur
- 23 -
DIRECTORS’ REPORT BRIGHTSTAR GLOBAL MINERAL RESOURCE ESTIMATE AT 30 JUNE 2026 Table 2: Brightstar Mineral Resource Estimate Summary (June 2026) Location Cut-off Measured Indicated Inferred Total
g/t kt g/t koz kt g/t koz kt g/t koz kt g/t koz Au Au Au Au Au Alpha 0.5 - - - 371 1.9 22 1,028 2.8 92 1,399 2.5 115 Beta 0.5 345 1.7 19 576 1.6 29 961 1.7 54 1,882 1.7 102 Cork Tree Well 0.5 - - - 3,264 1.6 166 3,198 1.2 126 6,462 1.4 292 Lord Byron 0.5 311 1.7 17 2,104 1.5 105 2,974 1.5 145 5,389 1.5 267 Fish 1.6 25 5.4 4 199 4.5 29 153 3.2 16 376 4.0 49 Gilt Key 0.5 - - - 15 2.2 1 153 1.3 6 168 1.3 8 Second Fortune (UG) 2.5 24 15.3 12 34 13.7 15 34 11.7 13 92 13.4 40 Total – Laverton 705 2.3 52 6563 1.7 367 8,501 1.7 452 15,768 1.7 873 Lady Shenton System 0.5/1.2 - - - 3,725 1.4 168 4,349 1.3 184 8,074 1.4 352 Yunndaga 0.5/1.2 - - - 2,172 2.2 152 923 1.8 54 3,095 2.1 206 Aspacia 0.5 - - - 137 1.7 7 1,238 1.6 62 1,375 1.6 70 Lady Harriet System 0.5 - - - 520 1.3 22 590 1.1 21 1,110 1.2 43 Link Zone 0.5 - - - 160 1.3 7 740 1.0 23 890 1.0 29 Selkirk 0.5 - - - 30 6.3 6 140 1.2 5 170 2.1 12 Lady Irene 0.5 - - - - - - 100 1.7 6 100 1.7 6 Total – Menzies - - - 6,744 1.7 362 8,080 1.4 355 14,814 1.5 718 Montague- Boulder 0.6 - - - 522 4.0 67 2,556 1.2 96 3,078 1.7 163 Whistler 0.5 - - - - - - 1,704 2.2 120 1,704 2.2 120 Evermore 0.6 - - - - - - 1,319 1.6 67 1,319 1.6 67 Achilles Nth / Airport 0.6 - - - 221 2.0 14 1,847 1.4 85 2,068 1.5 99 Julias 1
(Attributable) 0.6 - - - - - - - - - 1,431 1.3 58 Lord Nelson 0.5 - - - 1,500 2.1 100 4,100 1.4 191 5,600 1.6 291 Lord Henry 0.5 - - - 1,626 1.5 78 570 1.1 20 2,197 1.4 98 Vanguard Camp 0.5 - - - 405 2.0 26 3,344 1.8 191 3,749 1.8 217 Havilah Camp 0.5 - - - - - - 1,171 1.4 54 1,171 1.4 54 Indomitable Camp 0.5 - - - 800 0.9 23 7,400 1.1 273 8,200 1.1 296 Bull Oak 0.5 - - - - - - 2,470 1.1 90 2,470 1.1 90 Two Mile Hill 0.5/0.73 - - - 1,786 1.4 82 11,160 1.6 582 12,945 1.6 664 Shillington 0.5 - - - 1300 1.5 61 613 1.5 30 1,913 1.5 91 McIntyre 0.5 - - - 496 1.2 19 67 0.9 2 562 1.2 21 Plum Pudding 0.5 - - - 325 1.5 15 88 1.2 4 413 1.4 19 Central Trend (Eureka, Wirraminna, Old Town, Twin Shafts, Goat Farm, McClaren) 0.5 - - - 1,480 1.1 53 1,131 1.1 39 2,612 1.1 91 Total – Sandstone - - - 10,461 1.6 538 39,540 1.5 1,844 51,432 1.5 2,439 Total – BTR (Attributable) 705 2.3 52 23,768 1.7 1,267 56,121 1.5 2,651 82,014 1.5 4,030
Refer Notes below
- 24 -
DIRECTORS’ REPORT
NOTES: • Note some rounding discrepancies may occur. Tonnes are reported as thousand tonnes (Kt) and rounded to the nearest 1000; Au ounces are reported as thousands rounded to the nearest 1,000. • Pericles, Lady Shenton & Stirling deposits consolidated into ‘Lady Shenton System’ at Menzies. • Warrior, Lady Harriet & Bellenger deposits consolidated into ‘Lady Harriet System’ at Menzies. • Julias is located on M57/427, which is owned 75% by Brightstar and 25% by Estuary Resources Pty Ltd. Attributable gold ounces to Brightstar include 75% of total • Mineral Resources are reported inclusive of Ore Reserves. • The Mineral Resource estimates include Inferred Mineral Resources that are normally considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Ore Reserves. There is also no certainty that Inferred Mineral Resources will be converted to Measured and Indicated categories through further drilling, or into Ore Reserves once economic considerations are applied. • Mineral Resources are depleted for historical mining.
FORWARD LOOKING STATEMENTS
This announcement includes forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Brightstar’s planned exploration, development and production program and other statements that are
not historical facts. When used in this document, the words such as "could," "plan," "expect," "intend," "may”, "potential,"
"should," and similar expressions are forward-looking statements.
Subject to the Aspirational Statements disclaimer below, the forward-looking statements are based on an assessment of present economic and operating conditions, and assumptions regarding future events and actions that, as at the date of this announcement, are considered reasonable by the Company. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the Company and its Directors and management. The Company cannot and does not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements will actually occur and investors are cautioned not to place undue reliance on these forward-looking statements. The Company has no intention to update or revise forward-looking statements, except where required by law.
ASPIRATIONAL STATEMENTS The statements which may appear in this report regarding the aspirations for Brightstar to target Group production profile of +200koz p.a. by 2029, are aspirational statements. These statements are not production targets as Brightstar does not yet have sufficient objective reasonable grounds to believe that the statements can be achieved. Importantly, the statements are considered aspirational because, as detailed in Brightstar’s announcement of 30 April 2025, Brightstar has not yet completed a pre-feasibility study for Sandstone, noting that Sandstone has a long operating history with detailed information available on historical performance across the majority of deposits, ore mineralisation styles and operating parameters (i.e. open pit mining and conventional carbon-in-leach processing conducted in the recent past). While preliminary assessments have been undertaken, substantial further work is required before Brightstar will be in a position to have sufficient objective reasonable grounds to publish production targets or forecast financial information relating to the Sandstone Project. The study will need to consider a number of variables and focus areas which are expected to include, but are not limited to items within the following feasibility study workstreams: preparing robust update Mineral Resource Estimates for each deposit based on geological models generated by existing and new geological information informed by Brightstar’s current drilling programs; applying current (CY2025) mining cost and operational parameters to delineate economic mining optimisations, open pit mine designs and schedules that encapsulates geotechnical and metallurgical recovery information from third party test work; assessments into approvals and permitting processes, along with detailed engineering design work, optimal processing flowsheets and requisite infrastructure that delivers the best outcome of recovered metal, operating costs and capital costs which supports these aspirations.
COMPETENT PERSON STATEMENT Competent Person Statement – Exploration Results The information presented in this report relating to the Exploration Results of the Menzies, Laverton and Sandstone Gold Project areas is based on and fairly represents information compiled by Mr Michael Kammermann, MAIG. Mr Kammermann is a Member of the Australasian Institute of Geoscientists (AIG) and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking to qualify as a “Competent Person” as that term is defined in the 2012 Edition of the “Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012)”. Mr Kammermann is a full-time employee of the Company in the position of Exploration Manager and has provided written consent approving the inclusion of the Exploration Results in the form and context in which they appear.
Competent Person Statement – Mineral Resource Estimates
This Announcement contains references to Brightstar’s JORC Mineral Resource estimates, extracted from the ASX
announcements titled “Cork Tree Well Resource Upgrade Delivers 1Moz Group MRE” dated 23 June 2023, “Maiden Link
- 25 -
DIRECTORS’ REPORT
Zone Mineral Resource” dated 15 November 2023, "Aspacia deposit records maiden Mineral Resource at the Menzies Gold Project” dated 17 April 2024, “Brightstar Makes Recommended Bid for Linden Gold”, dated 25 March 2024, “Brightstar to drive consolidation of Sandstone Gold District” dated 1 August 2024, “Scheme Booklet Registered by ASIC” dated 14 October 2024 and “Robust Mineral Resource Upgrades at Laverton and Menzies Underpins Future Mining Operations” dated 19 May 2025, Menzies and Laverton Gold Projects Feasibility Study” dated 30 June 2025, “Brightstar pursues logical consolidation at Sandstone Hub” dated 18 July 2025, “Significant Growth in Menzies Mineral Resource” dated 11 December 2025 and “Lord Byron MRE Update” dated 12 January 2026.
Aurumin’s Mineral Resource Estimates are extracted from the ASX announcement titled “Brightstar Pursues Synergistic Consolidation and Sandstone” dated 21 July 2025.
Brightstar confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the Mineral Resource estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.
Competent Person Statement – Ore Reserve Estimates
The information in this report that relates to Ore Reserves for Yunndaga Underground and the Lord Byron, Cork Tree Well
and Lady Shenton Open Pits is based on, and reasonably represents, information and supporting documentation compiled by
Mr Andrew Rich, who is an Executive Director and shareholder of Brightstar Resources Limited, and has sufficient relevant
experience on matters relating to mine design, mine scheduling, mining methodology and mining costs. Mr Rich is a member
of the Australian Institute of Mining and Metallurgy. Mr Rich is satisfied that the information provided in this announcement
has been determined to a reserve level of accuracy. Mr Rich consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears.
COMPLIANCE STATEMENT With reference to previously reported Exploration Results and Mineral Resources, the Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
DIVIDENDS No dividends have been paid or declared since the start of the financial year and the directors do not recommend the payment of a dividend in respect of the financial year.
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS There were no significant changes in the state of affairs of the Group during the year not otherwise disclosed in the FY26 financial statements.
EVENTS AFTER THE BALANCE DATE
On 9 July 2026, the Company executed a binding term sheet to purchase a camp in Laverton for the purchase price of $10.3 million.
LIKELY DEVELOPMENTS
The Directors are not aware of any likely developments of which could be expected to significantly affect the results of the Group’s operations in future financial years not otherwise disclosed in the Principal Activities, Review of Operations or Events After Balance Date sections of the Directors’ Report.
- 26 -
DIRECTORS’ REPORT
RESULTS The consolidated loss after income tax attributable to the members of the Group in was $76.93 million (2025: $46.07 million).
ENVIRONMENTAL LEGISLATION The Group’s operations are subject to significant environmental regulation under the law of the Commonwealth and State. The Directors of the Group monitor compliance with environmental regulations. The Directors are not aware of any significant breaches during the period covered by this Report.
MATERIAL BUSINESS RISKS The Board and Management have identified the following specific risks relevant to the Company’s current/ongoing business and operations:
Fluctuations in commodity prices and outlook The Group is by its nature exposed to fluctuations in the gold price and the Australian dollar exchange rate. Volatility in the gold price and Australian dollar effects the perceived value of the Group and its business performance. Declining gold prices can also impact operations by requiring a reassessment of the feasibility of a particular exploration or development project. Even if a project is ultimately determined to be economically viable, the need to conduct such a reassessment could cause delays and/or may interrupt operations, which may have a material adverse effect on our results of operations and financial condition.
Risk of exploration failure
Exploration activities are inherently risky, and the directors are unable to provide certainty that any or all of these objectives,
as outlined as business strategies above, will be able to be achieved. In the opinion of the directors, any further disclosure of
information regarding likely developments in the operations of the Group and the expected results of these operations in
subsequent financial years may prejudice the interests of the Company and accordingly, further information has not been
disclosed.
Additional requirement for capital Following the Company’s approval of the Final Investment Decision (FID) for the Goldfields Project and the successful completion of capital raising activities, including the issue of a Nordic Bond, the Company has strengthened its funding position to progress with its planned activities. The Company remains exposed to capital and funding risk as the Project progresses through development and construction. Project expenditure may exceed current estimates or funding requirements may increase as a result of cost inflation, project delays, changes in scope, unforeseen technical or operational matters, foreign exchange movements or other factors. Additional funding may therefore be required to meet the Company’s obligations or to support activities beyond the scope of current plans. If additional funding is required, there is no guarantee that it will be available on acceptable terms or at all. Any future equity financing may dilute existing shareholders, while additional debt financing may be subject to interest costs, covenants, security requirements and other restrictions. The Company may consequently need to defer, reduce or modify the scope or timing of planned activities if sufficient funding is not available. The Board and management actively monitor the Company’s liquidity, cash flow forecasts, project expenditure and funding requirements to manage this risk.
Mineral resource and reserve estimates and exploration
The Group’s mineral resource and reserve estimates are estimates, based on interpretations of geological data obtained from
drillholes and other sampling techniques. Actual mineralisation or geological conditions may be different from those predicted.
Market price fluctuations of gold as well as increased production and capital costs may render the Group’s resources
unprofitable to develop at a particular site or sites for periods of time or may render estimates containing relatively lower grade
mineralisation uneconomic. Estimated resources may have to be re-estimated based on actual production experience. Any
of these factors may require the Group to reduce its estimates, which could have a negative impact on the Group’s financial
results.
The Group’s exploration projects involve many risks and are frequently unsuccessful. Once a site with mineralisation is discovered (or acquired), it may take several years from the initial phases of drilling until production is possible. There is no assurance that current or future exploration programs will be successful. There is a risk that depletion of resources and reserves will not be offset by discoveries or acquisitions.
- 27 -
DIRECTORS’ REPORT
Mining, exploration and insurance
The mining industry is subject to significant risks and hazards, including environmental hazards, industrial accidents, unusual
or unexpected geological conditions, unavailability of materials and equipment, pit wall failures, rock bursts, seismic events,
cave-ins and weather conditions (including flooding and bush fires), most of which are beyond the Group’s control. These
risks and hazards could result in significant costs or delays that could have a material adverse effect on the Group’s financial
performance, liquidity and results of operation. There is a risk that unforeseen geological and geotechnical difficulties may be
encountered when developing and mining, such as unusual or unexpected geological conditions, underground access,
ambient rock temperature, rock bursts, seismicity and cave ins.
Unforeseen geological and geotechnical difficulties could impact operations and/or require additional operating or capital expenditure to rectify problems and thereby have an adverse effect on the Company's financial and operational performance.
The Group maintains insurance to cover the most common of these risks and hazards. The insurance is maintained in amounts that are considered reasonable depending on the circumstances surrounding each identified risk. However, property, liability and other insurance may not provide sufficient coverage for losses related to these or other risks or hazards.
Environmental, health, safety and permitting The Group’s activities are subject to laws and regulations governing the protection and management of the environment, water management, waste disposal, worker health and safety, mine development and rehabilitation and the protection of endangered and other special status species. The Group’s ability to obtain permits and approvals and to successfully operate may be adversely impacted by real or perceived detrimental events associated with the Group’s activities or those of other mining companies affecting the environment, human health and safety of the surrounding communities. Delays in obtaining or failure to obtain government permits and approvals may adversely affect the Group’s operations, including its ability to continue operations.
With the Group’s tenure located within Western Australia, the Group is subject to state and federal laws and regulations concerning the environment in Western Australia. Mechanised exploration will impact the local environment along with any advanced development and production activities. In undertaking exploration and mining activities, the Group intends to comply with all environmental laws. Inherent risks when completing exploration and mining activities include, but are not limited to, land disturbance and the disposal of waste products. An incident involving incorrect disposal of waste products could result in delays to exploration and mining, additional costs to remediate the location and any legislative penalties. The Group has procedures in place to minimise the occurrence of environmental impacts and any subsequent penalties; however, the nature of exploration, development and mining will always involve environmental risks.
The Group has implemented health, safety and community initiatives at its sites to manage the health and safety of its employees, contractors and members of the community. While these control measures are in place there is no guarantee that these will eliminate the occurrence of incidents which may result in personal injury or damage to property. In certain instances, such occurrences could give rise to regulatory fines and/or civil liability.
Heritage The Group is subject to state and federal laws and regulations concerning Native Title and Heritage rights and interests. The Company is required to ensure that tenure has been adequately surveyed and considered before commencing any activity that would disturb the natural environment and its surroundings. The Group complies with required legislation regarding Native Title and Heritage requirements and, where appropriate, engages a third party to ensure that all requirements are met. While all care is taken to ensure rights and interests are maintained, there is a level of risk inherent in exploration and mining activities that is unable to be fully mitigated.
- 28 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
The Directors of Brightstar Resources Limited present the Remuneration Report for the Company and its controlled entities (collectively, the Group) for the year ended 30 June 2026. This Remuneration Report (Report) forms part of the Directors’ Report and has been audited in accordance with section 300A of the Corporations Act 2001 (Cth).
This Report contains the following sections:
A. Key Management Personnel Covered by this Report
B. Summary of FY26 Remuneration Outcomes and Planned Changes for FY27
C. Remuneration Principles
D. Remuneration Governance
E. Executive Remuneration Arrangements
F. Executive Remuneration Outcomes
G. Contractual arrangements with executive KMPs
H. Statutory Remuneration of Executive KMP
I: Non-Executive Director Fees
J: Planned FY27 Executive Remuneration Changes
K. Additional Disclosures
A: Key Management Personnel Covered by this Report
This Remuneration Report details the remuneration arrangements for the Company’s Key Management Personnel (KMP). KMP are defined as those persons who, directly or indirectly, have authority and responsibility for planning, directing and controlling the activities of the Group including: • Non-Executive Directors (NEDs); and • Executive Directors and senior executives (collectively the Executives or Executive KMPs). The following details the KMP for FY26. Each was a KMP for the entire period, unless otherwise stated.
Name Role Term
Non-Executive Directors
Richard Crookes Non-Executive Chair Full year
Jonathan Downes Non-Executive Director Full year
Ashley Fraser Non-Executive Director Resigned 2 December 2025
Executive Directors
Alex Rovira Managing Director Full year
Andrew Rich Executive Director - Operations Full year
Other Senior Executives
Nicky Martin Chief Financial Officer Full year
Former KMP
Dean Vallve Chief Development Officer Resigned 12 September 2025
- 29 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
B: Summary of FY26 Remuneration Outcomes and Planned Changes for FY27
The following section summarises FY26 remuneration outcomes and the planned remuneration changes for FY27.
FY26 Highlights for KMP Remuneration
Executive fixed
remuneration
outcome
To ensure KMP are appropriately remunerated for the responsibilities, skills and experience
required to support the Company’s next phase of development, the Board periodically
reviews remuneration arrangements against comparable ASX-listed companies, informed by
market data provided by an external remuneration consultant. As communicated in the FY25
Remuneration Report, the Board approved increases of approximately 20% for the Managing
Director and Executive Director – Operations, and 3% for the Chief Financial Officer.
See Section F - FY26 Executive Remuneration Outcomes for more details.
Short term incentive
(STI) outcome
The Board assessed performance against the FY26 KPIs and approved an overall STI
outcome of 70%. The outcome reflected strong safety and environmental performance,
significant Ore Reserve growth, and Executive efforts in advancing the Goldfields Project into
development and the Sandstone Project through the Pre-Feasibility Study. While certain
production and cost performance metrics were below target, the Board exercised discretion
to award partial outcomes, taking into account broader operational performance and strategic
decisions during the year. No STI outcome was awarded for Absolute Total Shareholder
Return (ATSR), as the required threshold was not met.
See Section F - FY26 Executive Remuneration Outcomes for more details.
Long term incentive
(LTI) outcome
No LTI equity awards were tested or vested during the year ended 30 June 2026.
See Section F - FY26 Executive Remuneration Outcomes for more details.
Non-Executive
Director (NED) fees
During the year, there was no change to the NED Fees. NED do not participate in any
incentive plans during the year.
See Section I - Non-Executive Director Remuneration for more details.
FY27 Remuneration Approach
Planned changes
• Executive Fixed Remuneration adjustments of up to 18% (depending on the individual),
are planned for FY27 to position Executive remuneration at the Company’s desired
62.5
th
percentile of market, informed by external market data and the need to support
retention and future project delivery.
• The Board has engaged an external remuneration consultant to further develop /
enhance the FY27 KMP remuneration framework to support the Company’s next phase
of growth. This work will include Executive remuneration mix, LTI design and NED fees.
Further details are to be communicated in the FY27 Remuneration Report.
See Section J - Planned FY27 Executive Remuneration Changes for more details.
C: Remuneration Principles
KMP remuneration is guided by the following principles:
• competitive and reasonable, enabling the Company to attract and retain key talent;
• aligned to the Company’s strategic and business objectives and the creation of shareholder value;
• transparent and easily understood; and
• acceptable to shareholders.
- 30 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
D: Remuneration Governance
KMP remuneration decision making is guided by the following remuneration governance framework.
Board of Directors
(Board)
The Board:
▪ approves the remuneration arrangements of Executive KMP including fixed and variable pay
elements
▪ proposes the aggregate remuneration of NEDs for shareholder approval and sets
remuneration for individual NEDs
▪ engages external remuneration consultants for market insights and advice where necessary
▪ other matters as required
Remuneration and
Nomination
Committee (RNC)
The RNC:
• reviews and recommends remuneration policy and structure annually to ensure it remains
aligned to business needs and meets the Company’s remuneration principles
External Remuneration Consultants To ensure the Board is fully informed when making remuneration decisions, it may seek external, independent remuneration advice on remuneration related issues. No external remuneration consultants were used during FY26.
E: Executive Remuneration Arrangements
The executive remuneration framework consists of fixed remuneration, short-term incentives (STI) and long–term incentives
(LTI), each with a different reward focus.
Remuneration
Component
Vehicle Purpose Link to performance
Fixed
Remuneration
Base salary plus
statutory
superannuation. Non-
monetary benefits may
be paid including health
insurance and car
allowances.
Attract and retain executives with
the capability and experience to
deliver Brightstar’s strategy, having
regard to market benchmarks
among relevant peers (generally
targeting the 50
th
percentile of
market, and up to 62.5% percentile
for executive and senior leadership
roles).
Regularly reviewed to ensure
remuneration levels appropriately
reflect executive capability,
responsibilities, and contribution to
driving a positive culture and
delivering the business strategy.
Annual Short-
Term Incentive
(STI)
Performance Rights
and Cash
Reward for performance against
KPIs aligned to annual business
and individual objectives.
Strategic annual objectives are
embedded in each executive’s
performance scorecard.
Long-Term
Incentives
(LTI)
Performance Rights Align executive performance with
shareholder returns. Encourage
long-term value creation through
equity ownership.
Vesting is subject to the
achievement of defined business
milestones and Total Shareholder
Return (TSR) over a three-year
period.
- 31 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
E: Executive Remuneration Arrangements (continued)
Short-Term Incentive (STI)
What is the STI plan? The Company operates an annual STI plan which provides an award of cash and Performance Rights (Rights) that vest annually upon the achievement of defined performance measures. The performance period for the STI plan is 1 July 2025 to 30 June 2026.
What is the opportunity? 40% of base salary (applies to all executive KMP).
How the award is delivered STI awards are delivered in 50% Rights and 50% cash. Rights are issued at the
start of financial year and calculated based on a 20-day volume weighted average
share price (VWAP) up to but excluding 1 July 2025. Rights vest following the end
of the financial year, subject to performance.
How is performance measured?
Performance is assessed against a mix of financial and non-financial KPIs
representing the Company’s key value drivers for the year:
• Financial (15%) including cost management.
• Safety & Environment (15%) including Long Term Injury Frequency Rate
(LTIFR) and no major environmental or regulatory non-compliance.
• Operational Performance (15%) including Gold Production in line with
budget.
• Project milestones (15%) including Ore Reserve Growth and other
development targets where relevant.
• Shareholder return (15%) assessed via absolute total shareholder return
(TSR).
• Personal Objectives (25%) including role-based performance criteria as
set by the Board.
Following the end of the financial year, the Board assesses performance against
each KPI and determines the applicable outcome based on achievement against
the pre-determined performance targets. The Board may exercise discretion in
determining the final outcome, taking into account performance and relevant
circumstances during the year.
Please refer to Section F Executive Remuneration Outcomes for further details
regarding KPI targets and outcomes achieved for the year.
When will unvested awards be
forfeited?
Unvested awards may be forfeited where a participant ceases employment or
eligibility, fails to satisfy the applicable vesting conditions, or in circumstances
involving fraud, dishonesty or willful misconduct.
The Board retains discretion to determine otherwise, having regard to the circumstances and the relevant Plan Rules.
What happens at the change of control? The Board may determine how unvested awards are treated, including whether they are forfeited or vest on a pro-rata or full basis, having regard to the circumstances.
- 32 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
E: Executive Remuneration Arrangements (continued)
Long term Incentive (LTI)
What is the LTI plan?
The LTI plan is to align Executive award with the creation of shareholder value over the long
term.
What is the
opportunity?
Executive Directors (including Managing Director) – 90% of base salary
Other Executives - 65% of base salary
How the award is
delivered
LTI awards are delivered in Performance Rights, which vest after a three-year performance
period of 1 July 2025 to 30 June 2028.
How is performance
measured?
LTI vesting is subject to the following performance criteria measured over a three-year
performance period:
- Strategic business milestones (50%) based on the satisfaction of the following strategic milestones:
• Ore Reserves Public announcement to the Australia Securities Exchange (ASX) of 1,000,000oz of gold Ore Reserves (as defined in the JORC Code) declared across the Company’s projects (20%) • Completion of a Feasibility Study and subsequent Commencement of Construction of the Sandstone Gold Project. In respect of the Company’s Sandstone Hub, announcement to the ASX of a positive final investment decision and commencement of construction of a Company-owned processing plant, following completion of feasibility studies, all requisite permitting/approvals and funding (10%) • Laverton Commercial Production. In respect of the Company’s Laverton Hub, announcement to ASX of the commencement of commercial production processed through a Company-owned and operated processing plant (20%).
-
Health, Safety and Environment (10%) based on no fatalities, no serious injuries, and no major environmental incident or breach.
-
Total Shareholder Return (40%) assessed via:
• Absolute Total Shareholder Return (ATSR) - 20% Company’s ATSR Percentage Vesting <100% Nil 100% or above 100%
• Relative Total Shareholder Return (RTSR) - 20% The Company’s RTSR will be ranked against a peer group of ASX-listed gold development and emerging producer companies over the performance period (30 June 2025 to 30 June 2028). The comparable group comprises of:
• Rox Resources Ltd • Astral Resources NL • Black Cat Syndicate Ltd • Kaiser Reef Ltd • Meeka Metals Ltd • Magnetic Resources NL • Ausgold Ltd • Barton Gold Holdings Ltd • Horizon Minerals Ltd
Company’s TSR Relative to Peer Group Percentage Vesting <50 th percentile Nil 50 th percentile 50% >50 th percentile and <75 th percentile Pro rata between 50% and 100% >75 th percentile 100%
- 33 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
E: Executive Remuneration Arrangements (continued)
When will unvested awards be forfeited? Unvested awards may be forfeited where a participant ceases employment or eligibility, fails to satisfy the applicable vesting conditions, or in circumstances involving fraud, dishonesty or wilful misconduct.
The Board retains discretion to determine otherwise, having regard to the circumstances and the relevant Plan Rule
What happens at the change of control? The Board may determine how unvested awards are treated, including whether they are forfeited or vest on a pro-rata or full basis, having regard to the circumstances.
F: Executive Remuneration Outcomes
Statutory Performance Indicators The Company aims to align executive remuneration to the Company’s strategic and business objectives and the creation of shareholder wealth. The table below shows measures of the Group’s financial performance over the last five years as required by the Corporations Act 2001. However, these measures are not necessarily consistent with the measures used in determining the variable amounts of remuneration to be awarded to KMPs. As a consequence, there may not always be a direct correlation between the statutory key performance measures and the variable remuneration awarded.
2026 2025 2024* 2023 2022 Net (loss) / profit after tax ($’000) (76,930) (46,068) (16,291) 1,944 (3,950) Basic (loss) / profit (cents per share) (10.0) (12.5) (16.9) 0.2 (0.7) Dividends paid (cents per share) - - - - - Share price at end of year (cents) 29.5 45.6 42.5 1.1 1.8
- Net (loss) after tax is restated for the voluntary change in accounting policy (see Annual Report for the year ending 30 June 2025 Notes 14 and 18 of the Financial Statements).
The table above quotes loss/profit per share and share price on a post 25-for-1 share consolidation basis for FY26, FY25 and FY24 only, all other years are presented on a pre-share consolidation basis.
- 34 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
F: Executive Remuneration Outcomes
Fixed Remuneration changes
Fixed remuneration is reviewed annually against benchmark remuneration data, with any changes for Executives subject to Board approval.
The nature and amount of fixed remuneration for KMP depends on the role and market rates for the position, which are determined with the assistance of external advisors (where necessary), surveys and reports, taking into account the experience and qualifications of each individual. The Board ensures that the remuneration paid to executive KMP is consistent with market conditions and practices and demonstrates a correlation to performance and creation of value for shareholders.
Following the Board’s review of executive remuneration against comparable companies, Executive KMP fixed remuneration for FY26 is outlined in the table below: Name Position Fixed Remuneration per annum including superannuation (*) Alex Rovira Managing Director $505,000 Andrew Rich Executive Director – Operations $410,000 Nicky Martin Chief Financial Officer $344,853 Dean Vallve Chief Development Officer $321,795
- This amount excludes any non-monetary benefits such as health insurance and car allowances as these benefits do not form part of contractual arrangements.
STI Outcomes
The Board assessed
performance against the set
KPIs and approved an overall
STI outcome of 70%.
Key Performance Indicator
Weighting Achieved Weighted
Outcome
Outcome Summary
Safety
Lost Time Injury Frequency Rate
(LTIFR) of less than 1.5 for
FY2026
11% 100% 11% LTIFR of 0.
Score awarded 100%
Environment
No major environmental or
regulatory non-compliance issue
4% 100% 4% No major environmental or
regulatory non-compliance.
Score awarded 100%
Gold production
Achieving at least 110% of
Board approved group budgeted
gold production.
15% 75% 11% Gold production prior to the wind
down of production under the OPA
was in-line with budget. The Board
exercised discretion to recognise
the safe and effective development
and ramp-up of the Fish
Underground Mine and the on-going
contribution of the Second Fortune
operation. Score awarded: 75%
- 35 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
STI Outcomes
The Board assessed
performance against the set
KPIs and approved an overall
STI outcome of 70%.
Key Performance Indicator
Weighting Achieved Weighted
Outcome
Outcome Summary
Cost
Achieving operating costs of
less than $3,800/oz
15% 25% 4% Amendments to the mine plans and
production strategy, driven by
corporate strategic decisions during
the period, resulted in FY26
average costs being above the
threshold. Discretion was utilised
by the Board to recognise broad
cost discipline across the business.
Score Awarded: 25%
Reserve Growth
In respect of the Company’s
Laverton Hub, the Company
announcing at least 20%
increase in total group Reserves
as compared total group
Reserves as at 1 July 2025.
15% 100% 15% Ore Reserves increased by
approximately 50% between 1 July
2025 to 30 June 2026.
Score awarded 100%
Absolute total shareholder
return (ATSR)
ATSR measured by comparing
the Company’s 20 trading day
VWAP up to and including 30
June 2026. Company’s ATSR
vesting:
<25%: Nil
>25%: 100%
15% 0% 0% ATSR threshold not met.
Score awarded 0%
Personal Objectives 25% 100% 25% Individual performance milestones
were achieved through execution of
the company’s strategic objectives
and significant progress in
advancing the Goldfields and
Sandstone Projects towards stand-
alone development.
Score awarded 100%.
Total 100% 70% 70%
- 36 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
The following table provides STI outcomes by Executive for FY26
Name Maximum potential
award ($)
STI achieved STI Awarded Cash
1
($)
STI Awarded
No. of
Performance
Rights
Total ($)
Alex Rovira 190,000 70% 66,500 125,000 133,000
Andrew Rich 152,000 70% 53,200 100,000 106,400
Nicky Martin 125,941 70% 44,080 82,857 88,159
1 The FY26 STI was paid in August 2026
LTI outcomes
No LTI equity awards were tested or vested during the year ended 30 June 2026.
G. Contractual arrangements with executive KMPs
Remuneration and other terms of employment are formalised in service agreements for Executive Directors and employment contracts for other KMP. These service agreements and contracts specify the components of remuneration, benefits and notice periods. Participation in short term and long-term incentives are at the discretion of the Board. Other key provisions of the service agreements and employment contracts are set out below.
Name and Position Term of Agreement Resignation Notice Termination
Notice for cause Notice without
cause
Alex Rovira
Managing Director
Ongoing
(commenced 12
January 2023)
6 months No notice required 6 months
Andrew Rich
Executive Director –
Operations
Ongoing
(commenced 31 May
2024)
6 months No notice required 6 months
Nicky Martin
Chief Financial
Officer
Ongoing
(commenced 1 July
2024)
12 weeks No notice required 12 weeks
- 37 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
H. Statutory Remuneration of Executive KMP
The following table shows details of the remuneration expense recognised for the Group’s Executive KMP for the current and previous financial year measured in accordance with the requirements of
the accounting standards.
Short-term Post-
employment
Long-term
Name Year Salary Non-
monetary
benefits
Movement in
annual leave
provision
STI Cash or
Shares
3
STI Share based payment expense Performance Rights Superannuation Other bonuses 1
LTI Share based
payment expense
Performance
Rights/Options
Total Performance
related
$ $ $ $ $ $ $ $ $ %
Executive Directors
Alex Rovira 2026 475,000 - 32,884 66,500 58,714 30,000 - 222,389 885,487 39%
2025 375,000 - - 10,000 - 43,125 - 106,665 534,790 22%
Andrew Rich 2026 380,000 16,467 29,484 53,200 46,971 30,000 - 106,433 662,555 31%
2025 323,500 18,091 - 10,000 - 17,125 - 261,121 629,837 43%
Other KMP
Nicky Martin 2026 314,853 - 14,531 44,080 52,460 30,000 - 136,425 592,349 39%
2025 304,500 - - 60,000 - 30,000 - 402,283 796,783 58%
Former KMP
Dean Vallve
2
2026 58,359 - 4,489 - - 7,500 - - 70,348 0%
2025 280,000 - - 60,000 - 32,200 112,500 - 484,700 36%
Total 2026 1,228,212 16,467 81,388 163,780 158,145 97,500 - 465,247 2,210,739 36% 2025 1,283,000 18,091 - 140,000 - 122,450 112,500 770,069 2,446,110 42% 1 Other bonuses include payment of a sign-on incentive to Mr Vallve following declaration of commercial production at the Company’s Jasper Hills Project 2 Mr Vallve resigned, effective 12 September 2025 3 STI Cash and Shares column relates to cash payments in FY26. In FY25 $10,000 cash bonuses were awarded to KMPs with the balance of their STI awards issued in shares.
- 38 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
I. Non-Executive Director Fees
Non-Executive Directors (NEDs) receive an annual fee, there are no fees for chairing or participating on sub-committees of the Board. Fees for NEDs are not linked to performance of the Group. However, to align directors’ interests with shareholder interests, the directors are encouraged to hold shares in the group and are able to participate in the option plan.
Fees are reviewed annually by the Board taking into account comparable roles and market data provided by the Board’s independent remuneration adviser where required.
The maximum annual aggregate directors’ fee pool limit is $400,000 and was approved by shareholders at the Annual General Meeting on 29 March 2023.
All NEDs enter into a service agreement with the Company in the form of a letter of appointment. NED fees for FY26 are set out in the table below and remain unchanged from the prior year.
Annual base fees (excluding superannuation)) Non-Executive Chairman $75,000 Other Non-Executive Directors $48,000
The following provides the actual fees paid to NEDs during the year.
Short-term
benefits
Post-employment
Name Year Fees Superannuation Options Total
$ $ $ $ $
Non-Executive Directors
Richard Crookes 2026 75,000 9,000 - 84,000
2025 75,000 8,625 - 83,625
Jonathan Downes 2026 48,000 5,760 - 53,760
2025 48,000 5,520 - 53,520
Former Non-Executive Directors
Ashley Fraser
1
2026 20,258 2,431 - 22,689
2025 48,000 5,520 - 53,520
Matthew Bowles
2
2026 - - - -
2025 8,985 1,033 - 10,018
Total 2026 143,258 17,191 - 160,449
2025 179,985 20,698 - 200,683
1 Mr Fraser resigned on 2 December 2025 2 Mr Bowles was appointed 9 December 2024 and resigned 17 February 2025
- 39 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
J: Planned FY27 Executive Remuneration Changes
During FY26, the Board reviewed executive fixed remuneration against the RemSmart Energy Remuneration Report (an
independent, industry-recognised report for the mining industry), generally referencing the 50
th
percentile, with critical and
senior leadership roles more closely aligned to the 62.5
th
percentile.
Taking into account individual capability, contribution and stakeholder expectations, the Board approved the following fixed
remuneration changes to ensure remuneration aligned with the relevant market benchmarks (up to 62.5
th
percentile),
reflects each Executive’s skills, experience and responsibilities:
• Managing Director: 4% increase (FY27 fixed remuneration: $524,600)
• Executive Director – Operations: 18% increase (FY27 fixed remuneration: $483,180)
• Chief Financial Officer: 16% increase (FY27 fixed remuneration: $399,947)
The adjustments are effective from 1 July 2026.
The Board also engaged an external remuneration consultant to further develop the FY27 KMP remuneration arrangements, including executive remuneration mix, LTI design and NED fees. The review aims to ensure KMP remuneration remains aligned with market and shareholder expectations, supports attraction and retention, and is appropriate for the Company’s next phase of growth. Further details of the FY27 KMP remuneration arrangements will be disclosed in the FY27 Remuneration Report.
K. Additional Disclosures
i. Terms and conditions of the share-based payments arrangements
Performance Rights The fair value of the Performance Rights is determined based on the market price of the Company’s shares at the grant date. The terms and conditions of each grant of Performance Rights affecting remuneration in the current or a future reporting period are as follows:
- 40 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED) K. Additional Disclosures
Grant date Volume Share price at grant date Vesting Date Expiry date PR value Executive/Award Vested in year (volume) Maximum value yet to vest ($) 24 Nov 2025 151,785 $0.44 30 Jun 2026 31 Dec 2027 $0.44 Alex Rovira - STI 125,000 n/a 24 Nov 2025 26,786 $0.44 30 Jun 2026 31 Dec 2027 $0.16 Alex Rovira - STI - n/a 24 Nov 2025 121,428 $0.44 30 Jun 2026 31 Dec 2027 $0.44 Andrew Rich - STI 100,000 n/a 24 Nov 2025 21,429 $0.44 30 Jun 2026 31 Dec 2027 $0.16 Andrew Rich - STI - n/a 8 Oct 2025 100,611 $0.57 30 Jun 2026 31 Dec 2027 $0.57 Nicky Martin - STI 82,857 n/a 8 Oct 2025 17,755 $0.57 30 Jun 2026 31 Dec 2027 $0.32 Nicky Martin - STI - n/a 24 Nov 2025 1,500,000 $0.44 30 Jun 2028 31 Dec 2029 $0.44 Alex Rovira - LTI - 660,000 24 Nov 2025 500,000 $0.44 30 Jun 2028 31 Dec 2029 $0.22 Alex Rovira - LTI - 110,000 24 Nov 2025 500,000 $0.44 30 Jun 2028 31 Dec 2029 $0.33 Alex Rovira - LTI - 165,000 24 Nov 2025 1,200,000 $0.44 30 Jun 2028 31 Dec 2029 $0.44 Andrew Rich - LTI - 528,000 24 Nov 2025 400,000 $0.44 30 Jun 2028 31 Dec 2029 $0.22 Andrew Rich – LTI - 88,000 24 Nov 2025 400,000 $0.44 30 Jun 2028 31 Dec 2029 $0.33 Andrew Rich – LTI - 132,000 22 Dec 2025 720,000 $0.55 30 Jun 2028 31 Dec 2029 $0.55 Nicky Martin – LTI - 396,000 22 Dec 2025 240,000 $0.55 30 Jun 2028 31 Dec 2029 $0.32 Nicky Martin – LTI - 76,800 22 Dec 2025 240,000 $0.55 30 Jun 2028 31 Dec 2029 $0.40 Nicky Martin – LTI - 96,000 31 May 2024 12,937,500 1 $0.015 28 May 2027 3 Jun 2029 $0.015 Andrew Rich – LTI - 194,063 31 May 2024 12,937,500 1 $0.015 28 May 2027 3 Jun 2029 $0.015 Andrew Rich - LTI - 194,063
1 The volume is pre-share capital consolidation. On 17 April 2025 every 25 shares, options and performance rights were consolidated to 1 share, option and performance right, respectively.
- 41 -
DIRECTORS’ REPORT REMUNERATION REPORT (AUDITED) K. Additional Disclosures (continued)
ii. Reconciliation of Options, Performance Rights and Ordinary Shares held by KMP
Options
The table below shows a reconciliation of Options held by each KMP during the current reporting period. All Options
vest immediately at grant date.
Name Balance at
the start of
the year
Granted as
compensation
Expired At resignation
Other
changes
Balance at
the end of
the year
Number Number Number Number Number Number
Executive Directors
Alex Rovira - - - - - -
Andrew Rich - - - - - -
Other Executive KMP
Nicky Martin 1,600,000 - - - - 1,600,000
Non-Executive directors
Richard Crookes 2,000,000 - - - - 2,000,000
Jonathan Downes - - - - - -
Former KMP
Ashley Fraser - - - - - -
Dean Vallve 1,489,474 - - (1,489,474) - -
Total 5,089,474 - - (1,489,474) - 3,600,000
- 42 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED) K. Additional Disclosures (continued)
Reconciliation of Options, performance rights and ordinary shares held by KMP
Performance Rights
The table shows how many Performance Rights were granted and vested during the year. . Non- Executive Directors did
not hold any Performance Rights during the year.
Name Balance at the
start of the
year
Granted as
compensation
Exercised Lapsed/forfeited
Balance at
the end of
the year
Exercisable
Number Number Number Number Number Number
Executive Directors
Alex Rovira 2,000,000 2,678,571 (800,000) (1,200,000) 2,678,571 -
Andrew Rich 2,070,000 2,142,857 (517,500) - 3,695,357 -
Other Executive KMP
Nicky Martin - 1,318,366 - - 1,318,366 -
Former KMP
Dean Vallve - - - - - -
Total 4,070,000 6,139,794 (1,317,500) (1,200,000) 7,692,294
Shareholdings
Name
Balance at
the start of
the year
Granted
as
compen
sation
Performance
rights exercised
At resignation
Other
changes
Balance at the
end of the year
Number Number Number Number Number Number
Executive Directors
Alex Rovira 2,870,380 - 800,000 - 379,397 4,049,777
Andrew Rich 951,910 - 517,500 - 135,489 1,604,899
Other Executive KMP
Nicky Martin - 104,384 - - - 104,384
Non-Executive directors
Richard Crookes - - - - - -
Jonathan Downes
433,273 - - - 42,587 475,860
Former KMP
Ashley Fraser 13,696,960 - - (13,696,960) - -
Dean Vallve 20,329 - - (20,329) - -
Total 17,972,852 104,384 1,317,500 (13,717,289) 557,473 6,234,920
Loans Provided to KMP No loans were made to the directors of Brightstar and other KMP of the Group, including their close family members and entities related to them (2025: Nil).
- 43 -
DIRECTORS’ REPORT
REMUNERATION REPORT (AUDITED)
Other Transactions with related parties
Purchases from, and sales to, related parties are made on terms equivalent to those that prevail in arm’s length transactions.
During the year, Blue Cap Mining Pty Ltd (BCM), an entity controlled by Mr Ashley Fraser (non-executive director), provided services to Brightstar including earthworks, mobile equipment hire, personnel and production. Expenses incurred by the Group up until Mr Fraser’s resignation (2 December 2025) totalled $304,000 for the financial year ending 30 June 2026 (30 June 2025: $1,652,000). These rates were entered into on an arm’s length basis and tested in the market as fair and reasonable rates.
Other than as outlined above, the Group did not enter into any further related party transactions with the Director, key management personnel or their related entities.
END OF REMUNERATION REPORT (AUDITED)
Shares Under Option
Unissued ordinary shares of Brightstar Resources Limited under option at the date of this Report are as follows:
ASX Code Grant date
Number of shares
under option
Exercise price of
Option
Expiry date
O 16 22 May 2025 1,000,000 $0.75 19 Jul 2027
O 17 22 May 2025 1,000,000 $1.00 19 Jul 2028
O 20 17 Jul 2024 800,000 $0.63 1 Jul 2027
O 21 17 Jul 2024 800,000 $0.88 1 Jul 2027
O 23 30 Nov 2025 1,554,852 $0.24 31 Jul 2028
O 24 30 Nov 2025 8,626,128 $0.24 22 Dec 2026
O 26 30 Nov 2025 6,071,327 $0.24 31 Jul 2027
Total 19,852,307
Interests in Shares, Performance Rights and Options of the Company
At the date of this report, the interests of the Directors in the shares, performance rights and options of the Company were
as follows:
Director Shares Performance rights Options
Richard Crookes - - 2,000,000
Alex Rovira 4,175,047 2,500,000 -
Andrew Rich 1,704,899 3,552,500 -
Jonathan Downes 475,860 - -
- 44 -
DIRECTORS’ REPORT
Performance Rights on Issue
At the date of this Report the following Performance Rights are on issue, none of which have an exercise price:
ASX Code Grant date Number of Performance Rights Expiry date PRA 31 May 2024 776,250 3 June 2029 PRB 31 May 2024 776,250 3 June 2029 PRD 31 May 2024 776,250 3 June 2029 LTIP 24 Nov 2025; 22 Dec 2025 12,500,000 31 Dec 2029 STIP 8 Oct 2025 526,942 31 Dec 2027 Total 15,355,692
No Option or Performance Right holder has any right under the Options or Performance Rights to participate in any other share issue of the Company.
Shares Issued on the Exercise of Options and Performance Rights
The following ordinary shares of Brightstar Resources Limited were issued during the year ended 30 June 2026 on the exercise of the Performance Rights.
ASX Code Grant date of performance rights Exercise date Number of shares issued PR 1 29 Mar 2023 28 Jul 2025 800,000 PR C 31 May 2024 28 Jul 2025 776,250 Total 1,576,250
Since the year end the following shares were issued since the end of the financial year as a result of the exercise of an Option or Performance Right.
ASX Code Date issued Amount paid per share Number of shares issued STIP DIR 17 Aug 2026 Nil 225,000 STIP 27 Aug 2026 Nil 233,071 O22 28 Aug 2026 $0.24 5,000,000 O26 17 Aug 2026 $0.24 187,500 Total 5,645,571
INDEMINIFICATION AND INSURANCE OF DIRECTORS AND OFFICERS
Indemnification
The Company has agreed to indemnify current and past directors and officers of the Company and its controlled entities
against all liabilities to another person (other than the Company or a related body corporate) that may arise from their
position as Directors or Officer of the Company and its controlled entities, except where the liability arises out of conduct
involving a lack of good faith. The agreement stipulates that the Company will meet the full amount of any such liabilities,
including costs and expenses.
- 45 -
DIRECTORS’ REPORT
Insurance
During the year, the Company has paid insurance premiums in respect of directors’ and officers’ liability for current and
former directors, officers, and senior executives of the Company and its controlled entities. The contract of insurance
prohibits disclosure of the nature of the liability and the amount of the premium.
Voting of Shareholders at the last year’s annual general meeting
Brightstar Resources Limited received more than 99% of “yes” votes on its remuneration report for the 2025 financial year. The Company did not receive any specific feedback at the AGM or throughout the year on its remuneration practices.
PROCEEDINGS ON BEHALF OF THE COMPANY
No person has applied to the Court under section 237 of the Corporations Act 2001 for leave to bring proceedings on behalf of the Group, or to intervene in any proceedings to which the Group is a party, for the purpose of taking responsibility on behalf of the Group for all or part of those proceedings.
No proceedings have been brought or intervened in on behalf of the Company with leave of the Court under section 237 of the Corporations Act 2001.
AUDITOR INDEPENDENCE
Section 307C of the Corporations Act 2001 requires our auditors to provide the Directors of the Company with an Independence Declaration in relation to the audit of the annual report. This Independence Declaration is set out on page 46 and forms part of this Directors’ Report for the year ended 30 June 2026.
NON-AUDIT SERVICES Details of the amounts paid or payable to the auditor for non-audit services provided during the financial year by the auditor are outlined in Note 32 to the Financial Statements.
The Directors are satisfied that the provision of non-audit services during the financial year, by the auditor (or by another person or firm on the auditor’s behalf), is compatible with the general standard of independence for auditors imposed by the Corporations Act 2001.
ROUNDING OF AMOUNTS In accordance with ASIC Corporations (Rounding in Financial/Director’s Reports) Instrument 2026/183, the amounts in the Directors’ report and in the financial report have been rounded to the nearest thousand dollars, unless otherwise stated.
Signed in accordance with a resolution of the Directors made pursuant to s.298 (2) of the Corporations Act 2001.
Richard Crookes
Chairman
3 September 2026
KPMG, an Australian partnership and a member firm of the KPMG global organisation of independent member firms affiliated with KPMG International Limited, a private English company limited by guarantee. All rights reserved. The KPMG name and logo are trademarks used under license by the independent member firms of the KPMG global organisation. Liability limited by a scheme approved under Professional Standards Legislation. Lead Auditor’s Independence Declaration under Section 307C of the Corporations Act 2001 To the Directors of Brightstar Resources Ltd I declare that, to the best of my knowledge and belief, in relation to the audit of the financial report of Brightstar Resources Ltd for the financial year ended 30 June 2026 there have been: i.no contraventions of the auditor independence requirements as set out in the Corporations Act 2001 in relation to the audit; and ii.no contraventions
of any applicable code of professional conduct in relation to the audit. KPM_INI_01 PAR_SIG_01 PAR_NAM_01 PAR_POS_01 PAR_DAT_01 PAR_CIT_01 KPMGG Diedrich Partne r Perth 3 Septembe r 2026 -46 -
- 47 -
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME For the year ended 30 June 2026
Note June 2026 June 2025
$’000 $’000 Revenue from continuing operations 5 64,139 33,510 Cost of sales 6 (77,064) (40,178) Gross loss
(12,925) (6,668)
Other income 7(a) 137 1,958
Administration and other expenses 7(c) (12,257) (7,802) Exploration expenditure (45,294) (19,123) Depreciation and amortisation expense (446) (278) Share-based payments expense 24 (1,778) (1,148) Business acquisition income/(expense) (269) 261 Inventory write-down to net realisable value - (7,378) Care and maintenance (1,213) - Operating loss
(74,045) (40,178) Finance income 7(b) 2,692 473 Finance costs 7(b) (5,258) (2,112) Net financing loss
(2,566) (1,639) Loss on revaluation of financial instruments at fair value through profit and loss 25 (319) (4,251) Loss before income tax expense
(76,930) (46,068) Income tax benefit 8 - - Loss after income tax for the year
(76,930) (46,068)
Other comprehensive income
Other comprehensive income for the year, net of tax
Total comprehensive loss for the year (net of tax)
(76,930) (46,068)
Total comprehensive loss for the year attributable to the members of the parent
(76,930) (46,068)
Loss per share for the year attributable to the members of the parent:
Basic/diluted loss per share ($) 9 (0.10) (0.12)
The Consolidated Statement of Profit or Loss and Other Comprehensive Income should be
read in conjunction with the notes to the financial statements
- 48 -
CONSOLIDATED STATEMENT OF FINANCIAL POSITION As at 30 June 2026
Note June 2026 June 2025
$’000 $’000
Current Assets
Cash and cash equivalents 10 121,983 11,664
Restricted cash 11 160,927 -
Trade and other receivables 13 8,334 12,307
Inventories 14 636 1,186
Total Current Assets
291,880 25,157
Non-Current Assets
Property, plant and equipment 15 91,218 65,825
Deferred exploration and evaluation
expenditure
16 206,042 129,238
Inventories 14 17,378 -
Derivative financial instruments 26 29,958 -
Total Non-Current Assets 344,596 195,063
Total Assets 636,476 220,220
Current Liabilities
Trade and other payables 19 30,955 31,286
Lease liabilities 17 4,830 5,336
Borrowings 20 1,966 16,880
Provisions 21 1,102 899
Total Current Liabilities 38,853 54,401
Non-Current Liabilities
Lease liabilities 17 7,000 8,132
Borrowings 20 158,183 625
Provisions 21 29,564 10,890
Option premium payable 26 29,958 -
Total Non-Current Liabilities 224,705 19,647
Total Liabilities 263,558 74,048
Net Assets 372,918 146,172
Equity
Issued capital 22 549,621 255,011
Accumulated losses (196,458) (119,528)
Reserves 23 19,755 10,689
Total Equity 372,918 146,172
The Consolidated Statement of Financial Position should be read in conjunction with the notes to the financial statements.
- 49 -
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY As at 30 June 2026
Note Issued Capital Accumulated Losses Reserves Total
$’000 $’000 $’000 $’000 At 1 July 2024
108,861 (49,318) 9,541 69,084 Net effect of change in accounting policy
- (24,142) - (24,142) Restated balance at 1 July 2024
108,861 (73,460) 9,541 44,942 Loss for the period - (46,068) - (46,068) Total comprehensive loss for the period after tax
- (46,068) - (46,068) Issue of share capital
148,901 - - 148,901 Share issue costs
(2,751) - - (2,751)
Share-based payments
24
-
- 1,148 1,148 At 30 June 2025
255,011 (119,528) 10,689 146,172 At 1 July 2025
255,011 (119,528) 10,689 146,172 Loss for the period
-
(76,930) - (76,930) Total comprehensive loss for the period after tax
-
(76,930) - (76,930) Issue of share capital 22 306,282 - - 306,282 Share issue costs 22 (11,672) - - (11,672) Acquisition reserve 23
-
- 7,288 7,288 Share-based payments 24 - - 1,778 1,778 Balance at 30 June 2026 549,621 (196,458) 19,755 372,918
The Consolidated Statement of Changes in Equity should be read in conjunction with the notes to the financial statements.
- 50 -
CONSOLIDATED STATEMENT OF CASH FLOWS For the year ended 30 June 2026
Note June 2026 June 2025
$’000 $’000
Cash flows from operating activities
Receipts from customers 78,755 28,842
Payments to suppliers and employees
(86,592) (44,147) Payments for exploration expenditure (29,379) (15,942) Other income 111 58 Interest received
3,207 256 Net cash used in operating activities 12 (33,898) (30,933)
Cash flows from investing activities
Proceeds from disposals of property, plant and equipment - 840
Payments for property, plant and equipment (48,555) (23,916)
Interest paid on qualifying asset (5,296) -
Payments for acquisition of exploration assets (4,468) (5,000)
Payments to acquire subsidiaries, net of cash acquired - (125)
Cash acquired on acquisition of subsidiary 960 -
Receipts from disposal of/ (payments to acquire) financial assets (455) 34
Net cash used in investing activities (57,814) (28,167)
Cash flow from financing activities
Proceeds from issue of shares 242,500 54,000
Proceeds from exercise of share options 1,200 -
Share issue costs (11,672) (2,711)
Proceeds from borrowings 43,116 19,557
Repayment of borrowings (54,186) (4,352)
Payments for transaction costs (8,636) (288)
Interest paid on debt and leases (3,365) (836)
Principal element of lease payments (6,926) (2,800)
Effect of exchange rate movement on loan balance - 233
Net cash inflow from financing activities 202,031 62,803
Net increase in cash held 110,319 3,703 Cash and cash equivalents at beginning of the year 11,664 7,961 Cash and cash equivalents at end of the year 10 121,983 11,664
The Consolidated Statement of Cash Flows should be read in conjunction with the notes to the financial statements.
- 51 -
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 1: CORPORATE INFORMATION
Brightstar Resources Limited is a company limited by shares, incorporated and domiciled in Australia. The Company is a for-profit entity. Its registered office and principal place of business is Level 2, 36 Rowland Street, Subiaco, WA 6008.
The financial report covers Brightstar Resources Limited (“the Company”) and its controlled entities as a group (together referred to as the “Group”).
The consolidated financial statements for the year ended 30 June 2026 (including comparatives) were approved and authorised for issue by the Board of Directors on 3 September 2026. NOTE 2: BASIS OF PREPARATION
These general-purpose financial statements have been prepared in accordance with Australian Accounting Standards, other authoritative pronouncements of the Australian Accounting Standards Board (AASB), including Australian Interpretations, the Corporations Act 2001 and comply with International Financial Reporting Standards (IFRS), as issued by the International Accounting Standards Board.
Historical cost convention The financial report has been prepared under the historical cost convention, as modified by revaluations to fair value for certain classes of assets and liabilities as described in the accounting policies.
Functional and presentation currency Items included in the financial statements of each of the consolidated entities are measured using the currency of the primary economic environment in which the entity operates (“functional currency”). The consolidated financial statements are presented in Australian Dollars, which is Brightstar Resources Limited’s presentation currency.
Rounding of amounts The Company is of a kind referred to in Corporations Instrument 2026/183, issued by the Australian Securities and Investments Commission, relating to ‘rounding-off’. Amounts in this report have been rounded off in accordance with that Corporations Instrument to the nearest thousand dollars, unless otherwise stated.
Going Concern
This financial report has been prepared on a going concern basis, which contemplates continuity of normal business activities and the realisation of assets and settlements of liabilities in the ordinary course of business.
The Group has reported a net loss for the year of $76.9 million (2025: $46.1 million) and a cash outflow from operating activities of $33.9 million (2025: $30.9 million) and investing activities $57.8 million (2025: $28.2 million). At the year end, the Group had cash and cash equivalents of $122.0 million (2025: $11.7 million) and net current assets of $253.0 million (2025: net current liability of $29.2 million).
The achievement of cash flow forecasts to develop the Laverton Mill depends on:
- Release of restricted cash which is subject to the completion of certain conditions precedent and continued covenant compliance under the terms of the Nordic bond arrangement (refer Note 20);
- Successful commissioning of the Laverton Mill on time and on budget;
- Ramp up of operations to achieve acceptable levels of commercial production at budgeted costs; and
- Realising sales within budgeted timeframes at forecast gold prices. Should any or all of these factors not be achieved as forecast, or additional discretionary plans to be undertaken, the Group may be required to source additional funds through debt or equity markets or a combination of the two.
Based on the Group’s cash balance of $122.0 million at year end, the planned draw down of the senior secured debt facility amount of $160.9 million and forecast cash flows, the Directors are satisfied that the Group will have access to sufficient cash to meet expenditure requirements for a period of at least 12 months from the date of signing of this report. Accordingly, the Directors consider that the going concern basis of preparation is appropriate.
- 52 -
NOTES TO THE FINANCIAL STATEMENTS FOR THE YEAR ENDED 30 June 2026
NOTE 2: BASIS OF PREPARATION (CONTINUED)
New and revised accounting standards effective for the current reporting period The Group has adopted all of the new and amended Standards and Interpretations issued by the Australian Accounting Standards Board (the AASB) that are relevant to the Group and effective for the current reporting period.
Accounting standards issued but not yet effective The Group has considered all Standards and Interpretations issued but not yet effective for the current reporting period and has determined that none of the new or amended standards will significantly affect the Group’s accounting policies, financial position or performance, other than with respect to the below:
Presentation and Disclosure in Financial Statements – AASB 18
The AASB has issued AASB 18 Presentation and Disclosure in Financial Statements to replace AASB 101 Presentation
of Financial Statements. AASB 18 introduces the following changes to the presentation of financial statements and is
effective for reporting periods beginning on or after 1 January 2027:
• Income and expenses must be classified in the statement of profit or loss into one of five categories – investing, financing,
income taxes, discontinued operations and operating;
• Two new mandatory subtotals – operating profit or loss, and profit or loss before financing and income taxes;
• Strict rules for labelling, aggregation and disaggregation of items in the financial statements;
• New disclosures about management defined performance measures; and
• Amendments to the presentation requirements for interest income and expenses, and dividend income in the statement
of cash flows.
The Group does not intend to early adopt this amendment. The impact of the amendment to the Group’s Financial
Statements is yet to be determined.
NOTE 3: CRITICAL ACCOUNTING ESTIMATES, JUDGEMENTS AND ASSUMPTIONS
The preparation of the financial statements requires management to make judgements, estimates and assumptions that affect the reported amounts in the financial statements. Management continually evaluates its judgements and estimates in relation to assets, liabilities, contingent liabilities, revenue and expenses.
Management bases its judgements, estimates and assumptions on historical experience and on other various factors, including expectations of future events, management believes to be reasonable under the circumstances. The resulting accounting judgements and estimates will seldom equal the related actual results. The judgements, estimates and assumptions in these financial statements that have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial period are found in the following notes:
Note 8: Income tax and deferred tax assets; Note 14: Net realisable value and classification of inventory; Note 15: Reserves and resources – estimating reserves and resources; Note 16: Exploration and evaluation costs; Note 18: Acquisition of subsidiary; Note 21: Provision for rehabilitation; Note 24: Share-based payments; and Note 26: Financial risk management.
- 53 -
NOTES TO THE FINANCIAL STATEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 4: SEGMENT REPORTING
Segment Reporting The Group’s operating segment has been determined with reference to the information and reports the chief operating decision makers use to make strategic decisions regarding Company resources.
The chief operating decision makers include the Managing Director, Executive Director – Operations and the Board of Directors. Financial information is reported to the chief operating decision makers as a single segment and all significant operating decisions are based upon analysis of the Group as one segment. The financial results of this segment are equivalent to the financial statements of the Group as a whole.
The Group has one reportable segment which is exploration, development and mining of minerals in Australia. NOTE 5: REVENUE
Revenue recognised at a point in time:
June 2026 $’000 June 2025 $’000 Gold revenue 64,139 33,510 64,139 33,510
During the year ended 30 June 2026, revenue was derived from sales from Genesis Minerals Limited under the Ore Purchase Agreement.
Revenue composition
June 2026 $’000 June 2025 $’000 Gold sales revenue from customers 50,501 31,259 Adjustment arising from provisional pricing 13,638 2,251 Total revenue 64,139 33,510
Provisional pricing adjustments reflect movements in gold prices between the date of delivery and the reporting date or final settlement date.
Provisionally priced sales outstanding
At 30 June 2026, the Company did not have any trade receivables balance relating to provisionally priced sales.
Material accounting policy Sale of goods
The Group primarily generates revenue from the sale of gold ore. The Group delivers ore to the customer’s processing plant (Laverton Mill), who convert the ore into refined gold.
The sale of ore can contain provisional pricing at the time the product is delivered to the customer, with the final pricing
determined at a later date when the relevant pricing information is available.
Revenue from the sale of these goods is recognised when control over the inventory has transferred to the customer.
Revenue is recognised net of any processing charges charged by the customer to convert the ore into refined gold.
- 54 -
NOTES TO THE FINANCIAL STATEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 5: REVENUE (CONTINUED)
Material accounting policy Sale of goods (continued)
Control is generally considered to have passed when:
• physical possession and inventory risk is transferred to the customer;
• payment terms for the sale of goods can be clearly identified through the sale of metal credits received or receivable
for the transfer of control of the asset;
• the Group can determine with sufficient accuracy the metal content of the goods delivered; and
• the customer has no practical ability to reject the product where it is within contractually specified limits.
NOTE 6: COST OF SALES
June 2026 $’000 June 2025 $’000 Cost of production 30,432 26,474 Employee benefits expense 12,454 6,492 Depreciation and amortisation 31,484 6,091 Royalties 2,694 1,121 77,064 40,178
The Group uses ounces mined over estimated remaining reserves as its basis for depletion of production phase assets.
The total employee expense recorded in cost of sales, exploration expenditure and operating expenditure is $22,689,000 (2025: $12,314,000).
Material accounting policy Cost of sales – recognition and measurement
Cost of sales includes the normal costs of producing and selling gold ore. These costs include the mining, haulage and selling costs involved in producing and selling inventories, plus depreciation and amortisation arising from the use of property, plant and equipment associated with producing inventory for sale. Note 14 contains the accounting policy for the recognition and measurement of inventories.
NOTE 7: OTHER INCOME AND EXPENSE ITEMS
(a) Other income
June 2026 $’000 June 2025 $’000 Camp hire arrangement - 1,449 Other 137 509 137 1,958
Material accounting policy Other income
Other income is recognised when it is received or when the right to receive payment is established.
- 55 -
NOTES TO THE FINANCIAL STATEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 7: OTHER INCOME AND EXPENSE ITEMS (CONTINUED)
(b) Finance income and costs
Finance income
June 2026 $’000 June 2025 $’000 Interest income 2,492 256 Net foreign exchange gain 200 217 2,692 473
Finance costs
Interest on borrowings (1,658) (893)
Interest on lease liabilities (1,545) (101)
Provisions: unwinding of discount (755) (644)
Costs relating to borrowings (1,300) (474)
(5,258) (2,112)
Material accounting policy Finance income Interest Interest revenue is recognised on an accruals basis based on the interest rate, deposited amount and the time which lapses before the reporting period ends.
Finance costs
Provisions: unwinding of discount
The Group records the present value of the estimated costs of legal and constructive obligations to rehabilitate operating
locations and decommission assets in the period in which the obligation is incurred. The unwinding of the effect of
discounting the provision is recorded as a finance charge in the Statement of Profit or Loss.
Interest on lease liabilities Lease payments are allocated between principal and finance costs. To the extent that they are not directly attributable to the acquisition, construction or production of a qualifying asset, the finance costs are charged to the profit or loss over the lease period to produce a constant periodic rate of interest on the remaining balance of the liability for each period.
The Group’s finance income and finance costs includes foreign exchange gains and losses.
(c) Administration and other expenses
June 2026 $’000 June 2025 $’000 Employee benefits expense 7,192 3,560 Legal and compliance 1,579 1,219 Other expenses 3,486 3,023 12,257 7,802
- 56 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 8: INCOME TAX
(a) The components of tax (expense)/benefit comprise:
June 2026 $’000 June 2025 $’000 Current tax - - Deferred tax
Income tax (expense)/benefit reported in the profit or loss and other comprehensive income
(b) The prima facie tax payable on loss from ordinary activities before income tax is reconciled to the income tax expense as follows
June 2026
$’000
June 2025
$’000
Accounting loss before tax from continuing operations (76,930) (46,068)
Income tax (benefit)/expense calculated at an income tax rate of
30% (2025: 30%)
(23,079) (13,820)
Add/(Less) tax effect of:
Non-deductible expenses
649 2,723 Deferred tax position not recognised 22,430 11,097 Income tax (expense)/benefit reported in the profit or loss and other comprehensive income
(c) Deferred tax
June 2026 $’000 June 2025 $’000 Capital raising costs 3,495 1,049 Capital tax losses 26,623 26,509 Total deferred tax asset 30,118 27,558
Deferred exploration and evaluation (17,966) (10,877) Plant and equipment (9,483) (10,338) Other (2,669) (6,344) Total deferred tax liability (30,118) (27,558)
(d) Tax receivable/ (payable)
The consolidated entity is a member of a tax consolidated group, with Brightstar Resources Limited acting as the head entity for tax consolidation purposes. Under the tax consolidation regime, the entities within the tax consolidated group are treated as a single entity for Australian income tax purposes.
As at 30 June 2026, the consolidated entity has income tax receivable of nil (2025: nil).
Potential deferred tax assets attributable to tax losses and other temporary differences have not been brought to account at 30 June 2026 because the directors do not believe it is appropriate to regard realisation of the deferred tax assets as probable at this point in time. These benefits will only be obtained if:
-
the consolidated entity derives future assessable income of a nature and of an amount sufficient to enable the benefit from the deductions for the expenditure to be realised; and
-
no changes in tax legislation adversely affect the consolidated entity in realising the benefit from the deductions for the expenditure.
-
57 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 8: INCOME TAX (CONTINUED)
Material accounting policy The income tax expense (revenue) for the year comprises current income tax expense (income) and deferred tax expense (income).
Deferred Tax Deferred tax expense reflects movements in deferred tax asset and deferred tax liability balances during the year as well as unused tax losses.
Current and deferred income tax expense (income) is charged or credited directly to equity instead of the profit or loss when the tax relates to items that are credited or charged directly to equity.
Deferred tax assets and liabilities are ascertained based on temporary differences arising between the tax bases of assets and liabilities and their carrying amounts in the financial statements. Deferred tax assets also result where amounts have been fully expensed but future tax deductions are available. No deferred income tax will be recognised from the initial recognition of an asset or liability, excluding a business combination, where there is no effect on accounting or taxable profit or loss and does not give rise to equal taxable and deductible temporary differences.
Deferred tax assets and liabilities are calculated at the tax rates that are expected to apply to the period when the asset is realised or the liability is settled, based on tax rates enacted or substantively enacted at the end of the reporting period. Their measurement also reflects the manner in which management expects to recover or settle the carrying amount of the related asset or liability.
Deferred tax assets relating to temporary differences and unused tax losses are recognised only to the extent that it is probable that future taxable profit will be available against which the benefits of the deferred tax asset can be utilised.
Where temporary differences exist in relation to investments in subsidiaries, branches, associates, and joint ventures, deferred tax assets and liabilities are not recognised where the timing of the reversal of the temporary difference can be controlled, and it is not probable that the reversal will occur in the foreseeable future.
Current tax assets and liabilities are offset where a legally enforceable right of set-off exists and it is intended that net settlement or simultaneous realisation, and settlement of the respective asset and liability will occur. Deferred tax assets and liabilities are offset where a legally enforceable right of set-off exists, the deferred tax assets and liabilities relate to income taxes levied by the same taxation authority on either the same taxable entity or different taxable entities where it is intended that net settlement or simultaneous realisation and settlement of the respective asset and liability will occur in future periods in which significant amounts of deferred tax assets or liabilities are expected to be recovered or settled.
Income Tax and Deferred Tax Assets The consolidated entity is subject to income taxes in the jurisdictions in which it operates. Significant judgement is required in determining the provision for income tax. There are many transactions and calculations undertaken during the ordinary course of business for which the ultimate tax determination is uncertain. The consolidated entity recognises liabilities for anticipated tax audit issues based on the consolidated entity’s current understanding of the tax law. Where the final tax outcome of these matters is different from the carrying amounts, such differences will impact the current and deferred tax provisions in the period in which such determination is made.
Judgement is applied in determining whether a deferred tax asset be recognised for deductible temporary differences and unused tax losses. Deferred tax assets are recognised only if it is probable that future forecast taxable profits are available to utilise those temporary differences and losses, and the tax losses continue to be available having regard to relevant tax legislation associated with their recoupment. The Group has recognised deferred tax assets relating to carry forward losses only to the extent that they offset deferred tax liabilities.
- 58 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 9: LOSS PER SHARE
June 2026 June 2025 Net loss for the year in $’000 76,930 46,068 Weighted average number of ordinary shares for the purposes of basic loss per share in ‘000 769,875 369,990 Adjusted weighted average number of ordinary shares for the purposes of diluted loss per share n/a n/a Total basic/diluted loss per share ($) 0.10 0.12
Material accounting policy Basic Loss Per Share Basic loss per share is determined by dividing net profit or loss after income tax attributable to members of the Company, excluding any costs of servicing equity other than ordinary shares, by the weighted average number of ordinary shares outstanding during the financial year, adjusted for bonus elements in ordinary shares issued during the year. Diluted Loss Per Share Diluted loss per share adjusts the figures used in the determination of basic earnings per share to take into account the after-income tax effect of interest and other financing costs associated with dilutive potential ordinary shares and the weighted average number of shares assumed to have been issued for no consideration in relation to dilutive potential ordinary shares.
NOTE 10: CASH AND CASH EQUIVALENTS
June 2026 June 2025 $’000 $’000 Cash at bank and on hand 44,778 11,487 Term deposits 77,205 177
121,983 11,664
Material accounting policy Cash and cash equivalents Cash at bank earns interest at floating rates based on daily deposit rates. Short-term deposits are made in varying periods between one day and three months, depending on the immediate cash requirements of the Group and earn interest at the respective short-term deposit rates.
Cash flows are presented in the Statement of Cash Flows on a gross basis, except for the GST component of investing and financing activities, which are disclosed as operating cash flows.
NOTE 11: RESTRICTED CASH
June 2026 June 2025 $’000 $’000 Restricted cash (escrow) 160,927 -
- 59 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 11: RESTRICTED CASH (CONTINUED)
The restricted cash balance represents funds received following settlement of a US$120,000,000 senior secured bond in March 2026 (refer Note 20). Funds received are required to be held in escrow accounts with access to the cash restricted until pre-disbursement conditions precedent are satisfied. Upon satisfaction, the funds will be capable of drawdown, subject to an ongoing cost to complete test being achieved. For the purposes of the Statement of Cash Flows, cash and cash equivalents comprise of cash at bank and term deposits.
NOTE 12: CASHFLOW INFORMATION
(i) Reconciliation to Cash Flow Statement Cash and cash equivalents as shown in the Statement of Cash Flows is reconciled to the related items in the Statement of Financial Position as follows:
June 2026 June 2025 $’000 $’000 Cash and cash equivalents 121,983 11,664
(ii) Reconciliation of loss for the year to net cash flows used in operating activities
June 2026 June 2025
$’000 $’000
Loss for the year
(76,930) (46,068)
Depreciation and amortisation
31,930 6,369
Adjustment to inventory
-
3,822
Share-based payment expense (Note 24)
1,778 1,148 Net loss on revaluation of financial instruments at fair value through profit and loss (Note 25) 319 4,251 Camp hire agreement repayment -
(1,449)
Gain from sale of non-current asset -
(420) Shares issued as payment to suppliers
-
2,500 Other net non-cash items 1,058 (435) Finance costs 5,258 2,112
Changes in assets and liabilities
Change in trade and other receivables 6,561 (6,008) Change in inventories (16,416) 2,521 Change in provisions 14,563 296 Change in trade payables and other liabilities (2,019) 428
Net cash used in operating activities (33,898) (30,933) -
60 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 12: CASHFLOW INFORMATION (CONTINUED)
(iii) Non-cash investing and financing activities
June 2026 $’000 June 2025 $’000 Additions to the right of use asset (Note 15) 5,047 16,195 Options and Shares issued as consideration in business combination
- 2,284 Shares issued as consideration in subsidiary acquisition (Note
62,081 73,977 Shares issued as payment to suppliers (Note 22) - 2,500 Performance rights issued to employees for nil consideration (Note 24) 1,778 1,148
(iv) Changes in liabilities arising from financing activities
Lease Liabilities Borrowings Total
$’000
$’000 $’000
Balance at 1 July 2024
317
2,316 2,633
Net cash used in financing activities
(2,800)
(4,352) (7,152)
Additions
15,951
19,557 35,508
Other changes
(16) (16) Balance at 30 June 2025 13,468 17,505 30,973 Net cash used in financing activities (6,926) (54,186) (61,112) Additions 5,288 198,601 203,889 Other changes
(1,771) (1,771) Balance at 30 June 2026 11,830 160,149 171,979 NOTE 13: TRADE AND OTHER RECEIVABLES
June 2026 June 2025 Current $’000 $’000 Trade and other receivables 857 7,050 ATO receivable 2,053 931 Prepayments 1,570 610 Bank guarantees and deposits 77 75 Other financial assets (1) 3,777 3,641 8,334 12,307
(1) On 8 December 2023, prior to its acquisition, Linden Gold Alliance Limited (Linden) terminated a joint venture arrangement with Matsa Gold Pty Ltd (Matsa) in relation to the Devon Gold Mine. Pursuant to the Deed of Settlement (Deed), Linden has the right to receive future consideration equal to 50% of the net profit from the mining operations of Devon Gold Mine up to a maximum of $4,000,000. Net profit is defined as gross proceeds after recovery of all pre- development, development, exploration mining, financing and other costs.
- 61 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 13: TRADE AND OTHER RECEIVABLES (CONTINUED)
The Company has estimated the fair value of the consideration using a discounted cashflow model with estimates and judgements around the future profitability of the operation and timing of cashflows. During the year the financial asset corresponding to this arrangement has been reclassified from non-current to current due to the expected timing of receipt.
Fair value of other financial assets at amortised cost The fair values were calculated based on cash flows discounted using a current lending rate. They are classified as level 3 fair values in the fair value hierarchy due to the inclusion of unobservable inputs including counterparty credit risk (see Note 25).
Material accounting policy
Trade and other receivables
Trade and other receivables include amounts due from customers for goods sold and services performed in the ordinary
course of business. Trade and other receivables are initially recognised at fair value and subsequently measured at
amortised cost using effective interest method less any allowance for expected credit loss. Receivables expected to be
collected within 12 months of the end of the reporting period are classified as current assets.
Impairment of financial assets
The consolidated entity recognises a loss allowance for expected credit losses on financial assets which are measured
at amortised cost. The measurement of the loss allowance depends upon the consolidated entity’s assessment at the
end of each reporting period as to whether the financial instrument’s credit risk has increased significantly since initial
recognition, based on reasonable and supportable information that is available, without undue cost or effort to obtain.
Where there has not been a significant increase in exposure to credit risk since initial recognition, a 12-month expected
credit loss allowance is estimated. This represents a portion of the asset’s lifetime expected credit losses that is
attributable to a default event that is possible within the next 12 months. Where a financial asset has become credit
impaired or where it is determined that credit risk has increased significantly, the loss allowance is based on the asset’s
lifetime expected credit losses. The amount of expected credit loss recognised is measured on the basis of the
probability weighted present value of anticipated cash shortfalls over the life of the instrument discounted at the original
effective interest rate.
Investments and other financial assets
Classification
The Group classifies its financial assets in the following measurement categories:
• those to be measured subsequently at fair value (either through other comprehensive income (OCI) or through profit
or loss), and
• those to be measured at amortised cost.
The classification depends on the entity’s business model for managing the financial assets and the contractual terms
of the cash flows.
For assets measured at fair value, gains and losses will either be recorded in profit or loss or OCI. For investments in
equity instruments that are not held for trading, this will depend on whether the group has made an irrevocable election
at the time of initial recognition to account for the equity investment at fair value through other comprehensive income
(FVOCI).
The Group reclassifies debt investments when and only when its business model for managing those assets changes.
Recognition and derecognition
Regular way purchases and sales of financial assets are recognised on trade date, being the date on which the Group
commits to purchase or sell the asset. Financial assets are derecognised when the rights to receive cash flows from the
financial assets have expired or have been transferred and the group has transferred substantially all the risks and
rewards of ownership.
Measurement
At initial recognition, the Group measures a financial asset at its fair value plus, in the case of a financial asset not at
fair value through profit or loss (FVPL), transaction costs that are directly attributable to the acquisition of the financial
asset. Transaction costs of financial assets carried at FVPL are expensed in profit or loss.
Financial assets with embedded derivatives are considered in their entirety when determining whether their cash flows
are solely payment of principal and interest.
- 62 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 14: INVENTORY
June 2026 June 2025 $’000 $’000 Current
Ore stockpiles - 963 Consumable supplies 636 223 636 1,186 Non-current
Ore stockpiles 17,378 - 17,378 -
Classification of inventory Inventory classified as non-current relates to the ROM stockpiles at the Second Fortune and Fish mines. These gold ore stockpiles are not intended to be processed through the Laverton Mill within the next 12 months and are therefore classified as non-current inventory. In both the current and prior year, all inventory is carried at cost, with no inventory recognised at net realisable value (NRV).
Material accounting policy and significant judgement Recognition and measurement Ore stockpiles are physically measured and valued at the lower of cost and net realisable value. Cost represents the weighted average cost and includes direct labour, direct materials and an appropriate portion of fixed and variable production overhead expenditure including underground mining capital costs.
Net realisable value and classification of inventory
Ore stockpiles are measured at the lower of cost and net realisable value. The assessment of the net realisable value
involves significant judgements and estimates in relation to timing and cost of processing, commodity prices, recoveries
and the likely timing of sale of the ore processed. A change in any of these assumptions will alter the estimated net
realisable value and may therefore impact the carrying amount of inventory.
- 63 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 15: PROPERTY, PLANT AND EQUIPMENT
Property, Plant
and Equipment
Mine properties
Asset under
Construction
Right-of-use
asset
Total
$’000 $’000 $’000 $’000 $’000 At 1 July 2024, net of accumulated depreciation and impairment 458 28,235 - 282 28,975 Additions 6,949 19,913 - 16,195 43,057 Additions through acquisition of subsidiary 151 - - 110 261 Capitalised Right-of-use asset depreciation and interest on leased assets
-
2,213 - - 2,213 Disposal (written down value) - (420) - - (420) Depreciation charge for the year (297) (5,440) - (2,524) (8,261) At 30 June 2025, net of accumulated depreciation and impairment 7,261 44,501 - 14,063 65,825 Cost 11,831 93,053 - 16,654 121,538 Accumulated depreciation (4,570) (48,552) - (2,591) (55,713) At 1 July 2025, net of accumulated depreciation and impairment 7,261 44,501 - 14,063 65,825 Additions 9,671 16,007 22,035 5,047 52,760 Capitalised interest on qualifying asset - - 4,563 - 4,563 Disposal of right-of-use (ROU) asset - - - (448) (448) Elimination of accumulated depreciation of disposed ROU asset
-
-
- 448 448 Depreciation charge for the year (1,410) (23,106) - (7,414) (31,930) Balance at 30 June 2026, net of accumulated depreciation and impairment 15,522 37,402 26,598 11,696 91,218 Cost 21,502 109,060 26,598 21,253 178,413 Accumulated depreciation (5,980) (71,658) - (9,557) (87,195)
-
-
64 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 15: PROPERTY, PLANT AND EQUIPMENT (CONTINUED)
Material accounting policy and significant judgements
Property, plant and equipment
Plant and equipment is stated at cost less accumulated depreciation and any accumulated impairment losses. Such
cost includes the cost of replacing parts that are eligible for capitalisation when the cost of replacing the parts is incurred.
Similarly, when each major inspection is performed, its cost is recognised in the carrying amount of the plant and
equipment as a replacement only if it is eligible for capitalisation.
Depreciation is calculated on a straight-line basis over the estimated useful life of the assets as follows:
Property, plant and equipment 3 - 8 years
The assets' residual values, useful lives and amortisation methods are reviewed, and adjusted if appropriate, at each
financial year end.
(i) Impairment
The carrying values of plant and equipment are reviewed for impairment at each balance date, with recoverable amount
being estimated when events or changes in circumstances indicate that the carrying value may be impaired.
The recoverable amount of plant and equipment is based on the fair value less costs of disposal.
An impairment exists when the carrying value of an asset or cash-generating units exceeds its estimated recoverable
amount. The asset or cash-generating unit is then written down to its recoverable amount.
For plant and equipment, impairment losses are recognised in the statement of profit or loss as impairment expenses.
(ii) Derecognition and disposal
An item of property, plant and equipment is derecognised upon disposal or when no further future economic benefits
are expected from its use or disposal.
Any gain or loss arising on derecognition of the asset (calculated as the difference between the net disposal proceeds
and the carrying amount of the asset) is included in profit or loss in the year the asset is derecognised.
Mine properties
All expenditure incurred prior to the commencement of commercial production is carried forward to the extent to which
recoupment out of future revenue from the sale of production, or from the sale of the property is reasonably assured.
When further development expenditure is incurred in respect of mine properties after the commencement of production,
such expenditure is carried forward as part of mine development expenditure only when substantial future economic
benefits are thereby established, otherwise such expenditure is classified as part of the cost of production.
Mine properties are recognised at cost, less accumulated depreciation and accumulated losses.
Where mine properties are in production, amortisation of mine properties is provided on a unit of production basis, which
results in a write off of the cost proportional to the depletion of the proven and probable mineral reserves. In accordance
with its policy, the Group reviews the estimated useful lives of its mine properties on an ongoing basis.
Where the Group’s mine properties are in care and maintenance, the Group has impaired assets to its fair value less
cost of disposal and the Group amortises over a straight-line basis to account for the physical wear and tear while the
asset remains idle, over an estimated remaining useful life of 5 years.
The net carrying value of each area of interest is reviewed regularly and to the extent to which this value exceeds its
recoverable amount, the excess is fully provided against or written off in the financial year in which this is determined.
Asset under construction
This expenditure includes direct costs of construction, an appropriate allocation of overheads and where applicable
borrowing costs capitalised during construction. Once the asset is available for use, the aggregated capitalised costs
are classified under non-current assets as an appropriate class of property, plant and equipment and depreciation will
then commence.
Proved and probable ore reserves The Group estimates its Mineral Resources and Ore Reserves in accordance with the Australasian Code of Reporting for Mineral Resources and Ore Reserves 2012 (the “JORC Code”). The information on mineral resources and ore reserves was prepared by or under the supervision of Competent Persons as defined under the JORC Code. The estimate of these Resources and ore Reserves, by their nature, require judgements, estimates and assumptions. There are numerous uncertainties inherent in estimating mineral resources and ore reserves, and assumptions that are valid at the time of estimation that may change significantly when new information becomes available. Changes in forecast prices or commodities, exchange rates, production costs or recovery rates may change the economic status of reserves and may ultimately result in reserves being restated. Such changes in the ore reserve or mineral resource estimate may impact on the value of exploration and evaluation assets, mine properties, property plant and equipment, provision for rehabilitation and depreciation and amortisation charges.
- 65 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 15: PROPERTY, PLANT AND EQUIPMENT (CONTINUED)
Material accounting policy and significant judgements
Recoverability of Mine Properties
Development expenditure incurred once a Mine Property is in commercial production is carried forward as part of the
Mine Properties asset (sub-category of property, plant and equipment asset) only when future economic benefits are
expected to flow to the Group, otherwise such expenditure is classified as part of the cost of production. A regular
review is undertaken to determine the appropriateness of continuing to carry forward costs in relation to that area of
interest. An impairment exists when the carrying value of mine properties exceeds its estimated recoverable amount.
The recoverable amount of Mine Properties is the higher of fair value less costs of disposal and value in use. The Group
uses estimates and assumptions to assess the recoverability of Mine Properties including expected future cash flows.
- 66 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 16: DEFERRED EXPLORATION AND EVALUATION EXPENDITURE
Costs carried forward in respect of Exploration and Evaluation expenditure:
30 June 2026 $’000 30 June 2025 $’000 Opening balance 129,238 36,227 Acquisition of subsidiary (Note 18) 76,804 80,162 Acquisition of tenements - 12,849 Closing balance 206,042 129,238
Material accounting policy and significant judgements
Exploration and evaluation
Exploration for and evaluation of mineral resources is the search for mineral resources after the entity has obtained
legal rights to explore in a specific area, as well as the determination of the technical feasibility and commercial viability
of extracting the mineral resource. Accordingly, exploration and evaluation expenditures are those expenditures incurred
in connection with the exploration for and evaluation of mineral resources before the technical feasibility and commercial
viability of extracting a mineral resource are demonstrable. Exploration and evaluation assets are initially measured at
cost.
Accounting for exploration and evaluation expenditures is assessed separately for each “area of interest”. Each “area
of interest” is an individual geological area which is considered to constitute a favourable environment for the presence
of a mineral deposit or has been proved to contain such a deposit.
Exploration and evaluation costs are expensed in the year they are incurred, apart from acquisition costs which are
carried forward where right of tenure of the area of interest is current, and they are expected to be recouped through
sale or successful development and exploitation of the area of interest, or where exploration and evaluation activities in
the area of interest have not reached a stage that permits reasonable assessment of the existence of economically
recoverable reserves.
Where an area of interest is abandoned, or the Directors decide that it is not commercially viable, any accumulated
acquisition costs in respect of that area are written off in the financial period the decision is made. Each area of interest
is also reviewed at the end of each accounting period and accumulated costs are written off to the extent that they will
not be recoverable in the future.
Exploration and evaluation assets are assessed for impairment when facts and circumstances suggest that the carrying amount of an exploration and evaluation asset may exceed its recoverable amount. The recoverable amount of the exploration and evaluation asset (for the cash generating unit(s) to which it has been allocated being no larger than the relevant area of interest) is estimated to determine the extent of the impairment loss (if any). Where an impairment loss subsequently reverses, the carrying amount of the asset is increased to the revised estimate of its recoverable amount, but only to the extent that the increased carrying amount does not exceed the carrying amount that would have been determined had no impairment loss been recognised for the asset in previous years. Where a decision has been made to proceed with development in respect of a particular area of interest, the relevant exploration and evaluation asset is tested for impairment and the balance is then reclassified to Mine Properties.
Exploration and evaluation costs The application of the accounting policy for exploration and evaluation costs requires management to make certain estimates and assumptions as to future events and circumstances, in particular, the assessment of whether economic quantities of reserves will be found. Any such estimates and assumptions may change as new information becomes available, which may require adjustments to the carrying value of assets. Capitalised exploration and evaluation expenditure is assessed for impairment when an indicator of impairment exists, and capitalised assets are written off where required.
- 67 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 17: LEASE LIABILITIES
June 2026 $’000 June 2025 $’000 Leases
Current 4,830 5,336 Non-Current 7,000 8,132 11,830 13,468
Reconciliation of lease liability
June 2026 $’000 June 2025 $’000 Opening balance 13,468 317 Lease additions 4,788 15,951 Lease modifications 500 - Lease principal repayments (6,926) (2,800) Closing balance 11,830 13,468
Amounts recognised in the statement of profit and loss
June 2026 $’000 June 2025 $’000 Depreciation charge right-of-use assets 7,414 311 Interest expense (included in finance costs) 1,545 101 Expense relating to short-term leases (included in cost of sales) 8,853 1,550
The amounts in the table above are recognised in the Statement of Profit and Loss. Depreciation on right-of-use assets used in construction has been capitalised as assets under construction in accordance with AASB 116 Property, Plant and Equipment. Pursuant to AASB 116 the cost of an item of property, plant and equipment may include costs incurred relating to the leasing of assets that are used to construct property, plant and equipment.
Extension options
Extension and termination options are included in a number of leases across the Group. These are used to maximise operational flexibility in terms of managing the assets used in the Group’s operations. The majority of extension and termination options held are exercisable only by the Group and not by the respective lessor. The Group has applied judgement to determine the lease terms for some lease contracts in which it is a lessee that includes renewal options. The assessment of these options will impact the lease term and therefore affects the amount of lease liabilities and right-of- use assets recognised.
The Group’s leasing activities and lease accounting
The Group leases offices, camps and various equipment. Rental contracts are typically made for fixed periods of six months to four years, and they may include extension options as described above. The lease payments are discounted using the interest rate implicit in the lease. If that rate cannot be readily determined, which is generally the case for leases in the Group, the lessee’s incremental borrowing rate is used, being the rate that the individual lessee would have to pay to borrow the funds necessary to obtain an asset of similar value to the right-of-use asset in a similar economic environment with similar terms, security and conditions.
- 68 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 17: LEASE LIABILITIES (CONTINUED)
Material accounting policy Leases At the commencement date of a lease (other than leases of 12-months or less and leases of low value assets), the Group recognises a lease asset representing its right to use the underlying asset and a lease liability representing its obligation to make lease payments. Lease assets Lease assets are initially recognised at cost, comprising the amount of the initial measurement of the lease liability, any lease payments made at or before the commencement date of the lease, less any lease incentives received, any initial direct costs incurred by the Group, and an estimate of costs to be incurred by the Group in dismantling and removing the underlying asset, restoring the site on which it is located or restoring the underlying asset to the condition required by the terms and conditions of the lease, unless those costs are incurred to produce inventories. Subsequent to initial recognition, lease assets are measured at cost (adjusted for any remeasurement of the associated lease liability), less accumulated depreciation and any accumulated impairment loss. Lease assets are depreciated over the shorter of the lease term and the estimated useful life of the underlying asset, consistent with the estimated consumption of the economic benefits embodied in the underlying asset. Lease liabilities Lease liabilities are initially recognised at the present value of the future lease payments (i.e., the lease payments that are unpaid at the commencement date of the lease). These lease payments are discounted using the interest rate implicit in the lease, if that rate can be readily determined, or otherwise using the Group’s incremental borrowing rate. Subsequent to initial recognition, lease liabilities are measured at the present value of the remaining lease payments (i.e., the lease payments that are unpaid at the reporting date). Interest expense on lease liabilities is recognised in profit or loss (presented as a component of finance costs). Lease liabilities are remeasured to reflect changes to lease terms, changes to lease payments and any lease modifications not accounted for as separate leases. Variable lease payments not included in the measurement of lease liabilities are recognised as an expense when incurred. Leases of 12-months or less and leases of low value assets Lease payments made in relation to leases of 12-months or less and leases of low value assets (for which a lease asset and a lease liability has not been recognised) are recognised as an expense on a straight-line basis over the lease term.
- 69 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026
NOTE 18: ACQUISITION OF SUBSIDIARY
Current year – Aurumin Limited
On 21 July 2025 the Company announced it had entered a Scheme Implementation Deed to acquire 100% of the shares in Aurumin Limited (Aurumin) via a Share and Option Scheme of Arrangement (together the Schemes). The acquisition completed on 2 December 2025, the Company issued 128,002,115 fully paid ordinary shares to Aurumin shareholders and 28,094,929 options to Aurumin option holders. The fair value of shares issued was based upon the Company’s closing share price of $0.485. The fair value of the options was determined using the Hull-White stock option model. Key valuation inputs are as follows: Item/ASX code O22 O23 O24 O25 O26 Total Valuation date 30 Nov 2025 30 Nov 2025 30 Nov 2025 30 Nov 2025 30 Nov 2025 - Spot price ($) 0.485 0.485 0.485 0.485 0.485 - Exercise price ($) 0.240 0.240 0.240 1.0 0.24 - Vesting date n/a n/a n/a n/a n/a - Expiry date 31 Aug 2026 31 Jul 2028 22 Dec 2026 31 Jul 2026 31 Jul 2027 - Volatility 80% 80% 80% 80% 80% - Risk-free rate 3.81% 3.87% 3.81% 3.81% 3.81% - Dividend yield Nil Nil Nil Nil Nil - Number of options 5,000,000 2,679,852 12,500,000 1,656,250 6,258,827 28,094,929 Value ($) 0.265 0.283 0.270 0.062 0.276 - Total value ($’000) 1,325 758 3,375 103 1,727 7,288
- 70 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 18: ACQUISITION OF SUBSIDIARY (CONTINUED)
The fair value of the identifiable assets and liabilities of Aurumin at the date of acquisition have been determined
as follows ($’000)
Cash and cash equivalents
960
Trade receivables and other financial assets
415
Exploration, evaluation and development expenditure
76,804
Trade and other payables
(653)
Provisions
(3,643)
Acquisition date fair value of the total consideration transferred
73,883
Representing:
Shares issued to vendor 62,081 Options issued to vendor (Note 24) 7,288 Transaction costs 4,514
73,883
The transaction is accounted for as an asset acquisition as management has assessed it does not meet the definition of a business pursuant to AASB 3 Business Combinations. Aurumin is an entity which holds exploration licences within the Sandstone region.
- 71 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026
NOTE 18: ACQUISITION OF SUBSIDIARY (CONTINUED)
Prior period – Alto Metals Limited
On 1 August 2024 the Company announced it has entered a Scheme Implementation Deed to acquire 100% of the shares in Alto Metals Limited (Alto) via a Scheme of Arrangement (Scheme). Following approval of the Scheme on 29 November 2024 the Company issued 2,959,092,688 fully paid ordinary shares to Alto shareholders, being four Brightstar shares for one Alto share held. The Company’s closing share price on 29 November 2024 was $0.025. The fair value of the consideration paid is $73,980,000.
The fair value of the identifiable assets and liabilities of Alto at the date of acquisition have been determined as
follows ($’000)
Cash and cash equivalents
733
Trade receivables and other financial assets
58
Property, plant and equipment
261
Deferred exploration and evaluation expenditure
80,162
Trade and other payables
(2,168)
Lease liabilities
(129)
Employee entitlements
(159)
Acquisition date fair value of the total consideration transferred
78,758
Representing:
Shares issued to vendor (Note 24) 73,977 Transaction costs 4,781
78,758
The transaction is accounted for as an asset acquisition as management has assessed it does not meet the definition of a business pursuant to AASB 3 Business Combinations. Alto is an entity which holds exploration licences within the Sandstone region.
Material accounting policy Asset Acquisition not constituting a Business When an asset acquisition does not constitute a business combination, the assets and liabilities are assigned a carrying amount based on their relative fair values in an asset purchase transaction and no deferred tax will arise in relation to the acquired assets and assumed liabilities as the initial recognition exemption for deferred tax under AASB 112 applies. No goodwill will arise on the acquisition and transaction costs of the acquisition will be included in the capitalised cost of the asset.
- 72 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 19: TRADE AND OTHER PAYABLES
June 2026
$’000
June 2025
$’000
Current
Trade payables 6,565 10,210
Other payables and accruals 23,662 20,888
Interest payable 728 188
30,955 31,286
Material accounting policy Trade and other payables Trade payables and other payables represent liabilities for goods and services provided to the Group prior to the end of the financial year which are unpaid. Trade and other payables are presented as current liabilities unless payment is not due within 12 months from the reporting date. They are recognised initially at their fair value and subsequently measured at amortised cost. The amounts are unsecured and the majority of suppliers are usually payable within 30-60 days of recognition. NOTE 20: BORROWINGS
June 2026
$’000
June 2025
$’000
Current
Ocean Partners loan - 14,216
Camp financing arrangement - 2,182
Other loans 1,966 482
1,966 16,880
Non-Current
Secured debt (US$ denominated bond) 157,709 -
Other loans 474 625
158,183 625
- 73 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 20: BORROWINGS (CONTINUED)
US$ Secured Bond During March 2026, the Group completed settlement of a US$120,000,000 senior secured bond facility for the development of its Goldfields Project. The bond facility is administered by the bond trustee, Nordic Trustee ASA. Drawdown of bond proceeds is subject to satisfaction of customary conditions precedent for a fully secured bond of this nature, including completion of security documentation and satisfaction of cost-to-complete tests for each drawdown. Key terms of the bond are as follows: • Fixed coupon rate of 12.5% per annum, payable quarterly in arrears in cash • Term: 4 years • Issue date: 18 March 2026 • Issue price: 94% of par value • No principal repayment within 18 months of issue with a tiered amortisation profile thereafter and a 20% bullet repayment at maturity
The carrying amount of the US$ secured bond is made up as follows:
Secured debt (US$ Secured bond) $’000
Bond proceeds at inception 158,538
Unrealised foreign exchange loss* 5,678
Bond proceeds at 30 June 2026 164,216
Amortisation of bond discount 732
Directly attributable transaction costs (7,799)
Amortisation of transaction costs 561
Carrying amount as at 30 June 2026 157,709
*The value of the US$ secured bond is required to be translated at the end of each financial period utilising the closing
foreign exchange rate.
The Issuer is subject to certain financial covenants under the bond arrangements. The covenants require the Issuer to: • maintain minimum liquidity of A$15,000,000; • maintain an equity ratio of not less than 35% at each half-year reporting date; and • maintain a leverage ratio of no more than 3.25:1 commencing from 30 June 2028, reducing to 2:1 for periods ending on or after 31 March 2029. Compliance with these financial covenants is assessed at the relevant reporting dates and is certified to the Bond Trustee through delivery of a Compliance Certificate in connection with the Issuer’s financial reporting obligations. As at 30 June 2026, the Group is in compliance with all applicable financial covenants.
Ocean Partners Loan During the year, the Group fully repaid and extinguished its US$11,500,000 revolving debt facility (Loan Facility) with Ocean Partners Australia Pty Ltd (Ocean Partners).
Material accounting policy
Borrowings
Borrowings are initially measured at fair value less any directly attributable transaction costs. Subsequent to initial
recognition, these liabilities are measured at amortised cost using the effective interest rate method.
Borrowing costs directly attributable to the acquisition, construction or production of an asset that necessarily takes a
substantial period of time to get ready for its intended use or sale are capitalised as part of the cost of the asset. All
other borrowing costs are expensed in the period in which they occur. Borrowing costs consist of interest and other
costs incurred in connection with the borrowing of funds. Investment income earned on the temporary investment of
specific borrowings pending their expenditure on qualifying assets is deducted from the borrowing costs eligible for
capitalisation.
- 74 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 21: PROVISIONS
June 2026
‘$000
June 2025
$’000
Current
Employee benefits 1,102 899
1,102 899
Non-Current
Rehabilitation 29,564 10,890
29,564 10,890
The provision for rehabilitation represents the present value of estimated costs of site rehabilitation based upon costs of rehabilitation expected to be incurred at the date the rehabilitation is required and the area of currently disturbed ground subject to rehabilitation as at the reporting date.
(i) Reconciliation of movement in provision for rehabilitation:
June 2026 $’000 June 2025 $’000
Opening balance 10,890 10,596 Additions recognised through asset acquisition 3,643 - Reassessment 14,276 (82) Unwinding of discount 755 376 Closing balance 29,564 10,890
The reassessment increase during the year reflects an initiative to align the methodology and calculation of the rehabilitation provision consistently across all entities within the Group. This reassessment value is recognised as exploration and evaluation expenditure.
(ii) Leave obligations
The leave obligations cover the Group’s liabilities for annual leave which are classified as short-term benefits.
- 75 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 21: PROVISIONS (CONTINUED)
Material accounting policy and significant judgement
Provisions – Employee benefits
Wages, Salaries and Annual Leave
Liabilities for wages and salaries, including non-monetary benefits and annual leave are recognised in respect of
employees’ services up to the reporting date. They are measured at their nominal values using the remuneration rate
expected to apply at the time of settlement. Liabilities for non-accumulating sick leave are recognised when the leave
is taken and are measured at the rates paid or payable.
Long Service Leave
The liability for long service leave is recognised and measured at the present value of expected future payments to be
made in respect of services provided by employees up to the reporting date. Consideration is given to expected future
wage and salary levels, experience of employee of departures, and period of service.
Provision for restoration and rehabilitation
A provision for restoration and rehabilitation is recognised when there is a present obligation as a result of development
activities undertaken, it is probable that an outflow of economic benefits will be required to settle the obligation, and the
amount of the provision can be measured reliably. The estimated future obligations include the costs of abandoning
sites, removing facilities and making safe of any remaining aspects of previous mining operations.
The provision for future restoration costs is the best estimate of the present value of the expenditure required to settle
the restoration obligation at the balance date; this includes expected future costs, current legal and regulatory
requirements and technology.
Future restoration costs are reviewed annually and any changes in the estimate are reflected in the present value of the
restoration provision at each reporting date.
The initial estimate of the restoration and rehabilitation provision is capitalised into the cost of the related asset and
amortised on the same basis as the related asset, unless the present obligation arises from the production of inventory
in the period, in which case the amount is included in the cost of production for the period. Where restoration and
rehabilitation expenditure relates to exploration and evaluation activities, or otherwise does not give rise to future
economic benefits, the related amount is recognised as an expense as incurred. Changes in the estimate of the provision
for restoration and rehabilitation are treated in the same manner unless they are not expected to be recovered over the
course of the Groups operation where they are recognised in the Statement of Profit or Loss. The assets associated
with restoration and rehabilitation provisions are depreciated in accordance with the Group’s depreciation policy, which
is primarily based on a units-of-production methodology, reflecting the expected pattern of consumption of the underlying
economic benefits. The discount rate used to determine the present value of the restoration and rehabilitation provision
is based on Australian government bond rates with maturities consistent with the expected timing of the associated cash
flows. The unwinding of discounting on the provision is recognised as a finance cost rather than being capitalised into
the cost of the related asset.
NOTE 22: ISSUED CAPITAL
June 2026 June 2026 June 2025 June 2025
No.’000 $’000 No.’000 $’000 Fully paid ordinary shares 1,097,936 549,621 472,577 255,011
- 76 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 22: ISSUED CAPITAL (CONTINUED)
Date No.’000 $’000
Movement in ordinary share capital
At 1 July 2024
4,569,985 108,861 Acquisition of Linden Gold Alliance Pty Ltd 10 July 2024 152,239 2,284 Placement 8 August 2024 1,166,667 17,500 Exercise of performance rights 8 August 2024 20,000 - Placement 23 September 2024 433,333 6,500 Acquisition of Montague East Gold Project 23 September 2024 466,666 7,000 Shares issued as consideration for services 23 September 2024 323,835 4,857 Acquisition of Alto Metals Ltd (Note 18) 2 December 2024 2,959,093 73,977 Placement 4 December 2024 1,304,348 30,000 Exercise of ZEPO options 15 April 2025 10,000 - Exercise of performance rights 12 January 2025 10,000 - Consultant Shares 17 April 2025 10,729 283 Drilling Service Consideration Shares 17 April 2025 75,000 1,500 LBM Deferred Consideration shares 17 April 2025 312,500 5,000 Capital consolidation 25:1 17 April 2025 (11,341,818) - Less capital raising costs
- (2,751) At 30 June 2025 472,577 255,011 Placement 25 July 2025 104,167 50,000 Exercise of performance rights 28 July 2025 1,576 - ESIP bonus – issue of shares (1) 31 July 2025 931 446 ESIP bonus – issue of shares (1) 23 September 2025 58 23 Acquisition of Aurumin Ltd (Note 18) 2 December 2025 128,002 62,081 Exercise of options 14 January 2026 3,000 720 Exercise of options 15 January 2026 1,374 330 Placement 10 February 2026 105,603 52,801 Exercise of options 12 February 2026 625 150 Exercise of ZEPO options 23 February 2026 386 - Share Purchase Plan 6 March 2026 36,000 18,000 Placement 18 March 2026 243,397 121,699 ESIP bonus – issue of shares 8 April 2026 75 32 Exercise of ZEPO options 28 May 2026 165 - Less capital raising costs - (11,672) At 30 June 2026 1,097,936 549,621
(1) As part of the Employee Shares Incentive Plan, the Company issued 989,022 shares during the period to employees relating to bonuses for FY25.
- 77 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 22: ISSUED CAPITAL (CONTINUED)
Ordinary shares Ordinary shares entitle the holder to participate in the dividends and the proceeds on winding up in proportion to the number of and amounts paid on the shares held.
Share buy-back There is no current on-market share buy-back.
Material accounting policy Ordinary share capital Ordinary shares are classified as equity. Incremental costs directly attributable to the issue of new shares or options are shown in equity as a deduction, net of tax, from the proceeds. Incremental costs directly attributable to the issue of new shares or options for the acquisition of a business are not included in the cost of the acquisition as part of the purchase consideration.
NOTE 23: RESERVES
June 2026 $’000 June 2025 $’000 Share-based payment reserve 7,556 5,778 Equity reserve 4,911 4,911 Acquisition reserve (note 18) 7,288 - 19,755 10,689
Movement in share-based payment reserve
June 2026 $’000 June 2025 $’000 Opening balance 5,778 4,630 Share based payments (Note 24) 1,778 1,148 Closing balance 7,556 5,778 Nature and Purpose of Reserves Share-based payments reserve This reserve is used to record the value of equity benefits provided to employees and unrelated parties for services or acquisition of goods.
Equity reserve This reserve was created upon the completion of a company restructure in November 2020 and represents the difference between the fair value and historical issue value on the buy-back of shares.
Acquisition reserve This reserve was created upon the acquisition of Aurumin Limited and represents options issued to the vendor.
- 78 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 24: SHARE-BASED PAYMENTS
June 2026 $’000 June 2025 $’000 Securities issued in current financial year (STI) (i) 523 - Securities issued in current financial year (LTI) (ii) 1,327 - Securities issued in previous financial years (iii) (72) 1,148 Total movement in reserves 1,778 1,148
Represented by
Share-based payment expense 1,778 1,148
1,778 1,148
Reconciliation of share-based payment expense to the expense recorded in profit and loss
June 2026 $’000 June 2025 $’000 Share-based payment expense 1,778 1,148 1,778 1,148
- 79 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 24: SHARE-BASED PAYMENTS (CONTINUED)
(i) Securities issued this financial year (STI)
Under the Company’s Incentive Award Plan, the Company issued the following incentives to Executive Directors, Executives and Management during the period: • a short-term incentive (STI), designed to reward creation of exceptional short-term shareholder value as evidenced by the performance hurdles, issued in seven tranches of Performance Rights (Rights) for Executive Directors as (Class STIP PR DIR) and seven tranches of Performance Rights for Executives and Management (as Class STIP PR) and; • a long-term incentive (LTI), designed to reward creation of exceptional long-term shareholder value as evidenced by performance hurdles, issued in six tranches of Rights for Directors and Executives and four tranches for Management as (Class LTIP)
Details of Executive Directors’ STIs are as follows (Class PR DIR): Item Tranche 1 Tranche 2 Tranche 3 Tranche 4 Tranche 5 Tranche 6 Tranche 7 Grant date 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 Fair value of each Right ($) 0.44 0.44 0.44 0.44 0.44 0.16 0.44 Commencement of performance period 1 Jul 2025 1 Jul 2025 1 July2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 July 2025 Vesting date 30 Jun 2026 30 Jun 2026 30 Jun 2026 30 Jun 2026 30 Jun 2026 30 Jun 2026 30 Jun 2026 Expiry date 31 Dec 2027 31 Dec 2027 31 Dec 2027 31 Dec 2027 31 Dec 2027 31 Dec 2027 31 Dec 2027 Volatility n/a n/a n/a n/a n/a 80% n/a Risk-free rate n/a n/a n/a n/a n/a 3.67% n/a Dividend yield Nil Nil Nil Nil Nil Nil nil Number of Rights 36,161 12,054 48,214 48,214 48,214 48,214 80,357 Price at grant ($) 0.44 0.44 0.44 0.44 0.44 0.44 0.44
- 80 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 24: SHARE-BASED PAYMENTS (CONTINUED)
Details of STIs for Executives and Management (Class STIP PR)
Item Tranche 1 Tranche 2 Tranche 3 Tranche 4 Tranche 5 Tranche 6 Tranche 7
Grant date 8 Oct 2025 8 Oct 2025 8 Oct 2025 8 Oct 2025 8 Oct 2025 8 Oct 2025 8 Oct 2025
Fair value of each
Right ($)
0.57 0.57 0.57 0.57 0.57 0.32 0.57
Commencement
of performance
period
1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025
Vesting date
30 Jun
2026
30 Jun
2026
30 Jun
2026
30 Jun
2026
30 Jun
2026
30 Jun
2026
30 Jun
2026
Expiry date
31 Dec
2027
31 Dec
2027
31 Dec
2027
31 Dec
2027
31 Dec
2027
31 Dec
2027
31 Dec
2027
Volatility n/a n/a n/a n/a n/a 80% n/a
Risk-free rate n/a n/a n/a n/a n/a 4.33% n/a
Dividend yield Nil Nil Nil Nil Nil Nil Nil
Number of Rights 92,843 30,948 123,790 123,790 123,790 123,790 677,197
Price at grant ($) 0.57 0.57 0.57 0.57 0.57 0.57 0.57
In addition to remaining as an employee on 30 June 2026, STI performance rights were issued with the following vesting
conditions:
Tranche 1:
-
Safety – Lost time injury frequency rate less than 1.5 for FY2026. Tranche 2
-
Environment – No major environmental or regulatory non-compliance issue.
Tranche 3 -
Gold Production – Achieving at least 110% of Board approved Group budgeted gold production. Tranche 4
-
Cost – Achieving operating costs of less than $A3,800/oz Tranche 5
-
In respect of the Company’s Laverton Hub, the Company announcing at least a 20% increase in total Group Reserves as compared to total Group Reserves as at 1 July 2025.
Tranche 6 -
The number of Absolute total shareholder return (ATSR) Rights that vest is based on the total shareholder return (TSR) of Brightstar over the performance period. The ATSR is measured by comparing the Company’s 20 trading day volume weighted average share price (VWAP) up to and including 30 June 2025 to the 20 trading day VWAP up to and including 30 June 2026. The ATSR Rights will vest according to the following schedule:
-
81 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 24: SHARE-BASED PAYMENTS (CONTINUED)
Company’s TSR performance
Percentage of ATSR Rights
eligible to vest
<25% Nil
>25% 100%
Tranche 7
- Various personal objectives.
(iii) Securities issued this financial year (LTI)
Details of Executive Directors LTIs are as follows:
Item ATSR Rights RTSR Rights Tranche 1 Tranche 2 Tranche 3 Tranche 4 Grant date 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 Fair value of each Right ($) 0.22 0.33 0.44 0.44 0.44 0.44 Commencement of performance period 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 Vesting date 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 Expiry date 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 Volatility 80% 80% n/a n/a n/a n/a Risk-free rate 3.93% 3.93% n/a n/a n/a n/a Dividend yield Nil Nil Nil Nil Nil Nil Number of Rights 900,000 900,000 900,000 450,000 900,000 450,000 Price at grant ($) 0.44 0.44 0.44 0.44 0.44 0.44 Valuation per Tranche ($’000) 202 298 392 196 392 196 Share based payment expense ($’000) 67 99 78 39 78 39
- 82 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 24: SHARE-BASED PAYMENTS (CONTINUED)
Details of LTIs for Executive Employees
Item ATSR Rights RTSR Rights Tranche 1 Tranche 2 Tranche 3 Tranche 4
Grant date 22 Dec 2025 22 Dec 2025 22 Dec 2025 22 Dec 2025 22 Dec 2025 22 Dec 2025
Fair value of each
Right ($)
0.32 0.40 0.55 0.55 0.55 0.55
Commencement of
performance period
1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025
Vesting date 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028
Expiry date 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029
Volatility 80% 80% n/a n/a n/a n/a
Risk-free rate 4.33% 4.33% n/a n/a n/a n/a
Dividend yield Nil Nil Nil Nil Nil Nil
Number of Rights 385,000 385,000 385,000 192,500 385,000 192,500
Price at grant ($) 0.55 0.55 0.55 0.55 0.55 0.55
Valuation per
Tranche ($’000)
123 154 212 106 212 106
Share based
payment expense
($’000)
26 32 26 13 26 13
In addition to remaining as an employee on 30 June 2028. LTI performance rights were issued with the following vesting conditions: Market Based Measurements • ATSR Rights
- The number of ATSR Rights that vest is based on the TSR of Brightstar over the performance period. The ATSR
Rights will vest according to the following schedule:
Company’s TSR performance
Percentage of ATSR Rights eligible to vest <100% Nil >100% 100%
• RTSR Rights
-
The number of RTSR Rights that vest is based on the TSR of Brightstar over the performance period, relative to the returns of the Peer Group. The TSR is measured by comparing the relevant entity’s 20 day trading VWAP up to and including 30 June 2025 to the 20 trading day VWAP up to and including 30 June 2028 (with dividends reinvested). The RTSR Rights will vest according to the following schedule.
-
83 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 24: SHARE-BASED PAYMENTS (CONTINUED)
Company’s TSR performance relative to the Peer Group
Percentage of RTSR Rights
eligible to vest
Less than 50
th
percentile Nil
50
th
percentile 50%
Between 50
th
percentile and 75
th
percentile 51%-99% Pro-rata
Greater than 75
th
percentile 100%
Business Milestones Tranche 1 Ore Reserve – public announcement to the ASX of 1,000,000oz of gold Ore Reserve (as defined in the JORC Code) declared across the Company’s projects. Tranche 2 Health, Safety and Environment Measure – No serious injuries or death, no major environmental incident or breach Tranche 3 In respect of the Company’s Laverton Hub, announcement to the ASX of the commencement of commercial production processed through a Company-owned and operated processing plant. Tranche 4 In respect of the Company’s Sandstone Hub, announcement to the ASX of a positive final investment decision and commencement of construction of a second Company-owned processing plant, following completion of feasibility studies, all requisite permitting/approvals and funding.
Details of LTI for Management Item Tranche 1 Tranche 2 Tranche 3 Tranche 4 Grant date 22 Dec 2025 22 Dec 2025 22 Dec 2025 22 Dec 2025 Fair value of each Right ($) 0.55 0.55 0.55 0.55 Commencement of performance period 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 Vesting date 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 Expiry date 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 Volatility n/a n/a n/a n/a Risk-free rate n/a n/a n/a n/a Dividend yield Nil Nil Nil Nil Number of Rights 2,056,250 2,056,250 2,056,250 2,056,250 Price at grant ($) 0.55 0.55 0.55 0.55 Valuation per Tranche ($’000) 1,131 1,131 1,131 1,131 Share based payment expense ($’000) 197 198 198 198
- 84 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 24: SHARE-BASED PAYMENTS (CONTINUED)
In addition to remaining an employee on 30 June 2028. LTI performance rights for the Management were issued with the following vesting conditions: Business Milestones Tranche 1 Ore Reserve – public announcement to the ASX of 1,000,000oz of gold Ore Reserve (as defined in the JORC Code) declared across the Company’s projects. Tranche 2 Health, Safety and Environment Measure – No serious injuries or death, no major environmental incident or breach Tranche 3 In respect of the Company’s Laverton Hub, announcement to the ASX of the commencement of commercial production processed through a Company-owned and operated processing plant. Tranche 4 In respect of the Company’s Sandstone Hub, announcement to the ASX of a positive final investment decision and commencement of construction of a second Company-owned processing plant, following completion of feasibility studies, all requisite permitting/approvals and funding.
(iv) Securities issued in previous financial years
Performance Rights granted on 31 May 2024 On 3 June 2024, pre-share consolidation, 77,625,000 Performance Rights expiring 3 June 2029 (in 4 tranches) were issued to two employees of Linden Gold Alliance Pty Ltd (Linden) who joined the Company following completion of the acquisition of Linden, as replacement of their lapsed performance rights in Linden. Shareholders’ approval was obtained at the General Meeting held on 22 May 2024.
Tranche Vesting condition Probability of
vesting
1 The Company’s processing plant declares commercial production within 24 months
of the Takeover Offer becoming (or being declared) unconditional
0%
2 The Second Fortune Gold Project produces 50,000oz in cumulative production on a
cashflow positive basis within 36 months of the Takeover Offer becoming (or being
declared) unconditional
0%
3 The Company announcing the first gold production from the Jasper Hills Project
within 24 months of the Takeover Offer becoming (or being declared) unconditional
vested
4 Cumulative production from the Company of 100,000oz within 36 months of the
Takeover Offer becoming (or being declared) unconditional
10%
Tranche
Grant date Volume Share price at grant date Exercise price Expiry date PR value FY 26 Share based payment expense/ (reversal of expense) ($’000) Tranche 1 31 May 2024 19,406,250 $0.015 - 3 June 2029 $0.015 0 Tranche 2 31 May 2024 19,406,250 $0.015 - 3 June 2029 $0.015 (18) Tranche 3 31 May 2024 19,406,250 $0.015 - 3 June 2029 $0.015 0 Tranche 4 31 May 2024 19,406,250 $0.015 - 3 June 2029 $0.015 (54)
Total
(72)
- 85 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 24: SHARE-BASED PAYMENTS (CONTINUED) Set out below are summaries of options movement during the year and the comparative year: Year Ending 30 June 2026 ASX Code Grant date Expiry date Exercise price ($) post consolidation Balance at 1 July 2025 Granted during the year Exercised during the year Lapsed/forfeited during the year Balance at 30 June 2026 Exercisable at 30 June 2026 7OP 26-May-23 16-Jan-26 0.58 131,579 - - (131,579) - - 8OP 26-May-23 16-Jan-26 0.95 157,895 - - (157,895) - - O10 4-Sep-23 4-Aug-25 0.50 1,600,000 - - (1,600,000) - - O11 4-Sep-23 7-Jul-26 0.50 600,000 - - - 600,000 600,000 O12 4-Sep-23 7-Jul-26 0.75 600,000 - - - 600,000 600,000 O14 31-May-24 30-Jun-26 - 552,000 - (552,000) - - - O15 31-May-24 30-Jun-26 0.58 168,878 - - - 168,878 168,878 O16 22-May-25 19-Jul-27 0.75 1,000,000 - - - 1,000,000 1,000,000 O17 22-May-25 19-Jul-28 1.00 1,000,000 - - - 1,000,000 1,000,000 O18 5-Jul-24 7-Jul-26 0.63 600,000 - - - 600,000 600,000 O19 5-Jul-24 7-Jul-26 0.88 600,000 - - - 600,000 600,000 O20 17-Jul-24 1-Jul-27 0.63 800,000 - - - 800,000 800,000 O21 17-Jul-24 1-Jul-28 0.88 800,000 - - - 800,000 800,000 O22 30-Nov-25 31-Aug-26 0.24 - 5,000,000 - - 5,000,000 5,000,000 O23 30-Nov-25 31-Aug-26 0.24 - 2,679,852 (1,125,000) - 1,554,852 1,554,852 O24 30-Nov-25 22-Dec-26 0.24 - 12,500,000 (3,873,872) - 8,626,128 8,626,128 O25 30-Nov-25 30-Jul-26 1.00 - 1,656,250 - - 1,656,250 1,656,250 O26 30-Nov-25 30-Jun-27 0.24 - 6,258,827 - - 6,258,827 6,258,827 Total 8,610,352 28,094,929 (5,550,872) (1,889,474) 29,264,935 29,264,935
- 86 -
NOTES TO THE FINANCIAL STATEMEMENTS
FOR THE YEAR ENDED 30 June 2026
NOTE 24: SHARE-BASED PAYMENTS (CONTINUED)
Year Ending 30 June 2025
ASX Code Grant date Expiry date
Exercise price ($)
post
consolidation
Balance at 1 July
2024
Granted during
the year
Exercised during
the year
Capital
consolidation
movement
Lapsed/forfeited
during the year
Balance at 30
June 2025
Exercisable at 30
June 2025
OP8 1-Dec-21 1-Dec-24 0.05 2,200,000 - - - (2,200,000) - -
OP7 1-Dec-21 31-Dec-24 0.05 20,000,000 - - - (20,000,000) - -
OP9 30-Nov-22 30-Nov-26 - 10,000,000 - (10,000,000) - - - -
2OP 26-May-23 15-Sep-24 0.07 16,447,368 - - - (16,447,368) - -
1OP 26-May-23 21-Oct-24 0.08 21,052,631 - - - (21,052,631) - -
2SR 26-May-23 7-Oct-24 0.11 7,815,789 - - - (7,815,789) - -
3OP 26-May-23 15-Feb-25 0.11 4,473,685 - - - (4,473,685) - -
5OP 26-May-23 28-Apr-25 0.10 3,289,474 - - - (3,289,474) - -
7OP 26-May-23 16-Jan-26 0.58 3,289,474 - - (3,157,895) - 131,579 131,579
8OP 26-May-23 16-Jan-26 0.95 3,947,368 - - (3,789,473) - 157,895 157,895
O10 4-Sep-23 4-Aug-25 0.50 40,000,000 - - (38,400,000) - 1,600,000 1,600,000
O11 4-Sep-23 7-Jul-26 0.50 15,000,000 - - (14,400,000) - 600,000 600,000
O12 4-Sep-23 7-Jul-26 0.75 15,000,000 - - (14,400,000) - 600,000 600,000
O14 31-May-24 30-Jun-26 - 13,800,000 - - (13,248,000) - 552,000 552,000
O15 31-May-24 30-Jun-26 0.58 4,221,944 - - (4,053,066) - 168,878 168,878
O13 31-May-24 25-Feb-25 0.90 88,509,757 - - - (88,509,757) - -
O16 22-May-25 19-Jul-27 0.75 25,000,000 - - (24,000,000) - 1,000,000 1,000,000
O17 22-May-25 19-Jul-28 1.00 25,000,000 - - (24,000,000) - 1,000,000 1,000,000
O18 5-Jul-24 7-Jul-26 0.63 - 25,000,000 - (14,400,000) (10,000,000) 600,000 600,000
O19 5-Jul-24 7-Jul-26 0.88 - 25,000,000 - (14,400,000) (10,000,000) 600,000 600,000
O20 17-Jul-24 1-Jul-27 0.63 - 20,000,000 - (19,200,000) - 800,000 800,000
O21 17-Jul-24 1-Jul-28 0.88 - 20,000,000 - (19,200,000) - 800,000 800,000
Total 319,047,490 90,000,000 (10,000,000) (206,648,434) (183,788,704) 8,610,352 8,610,352
- 87 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 24: SHARE-BASED PAYMENTS (CONTINUED) Set out below are summaries of performance rights movement during the year and the comparative year:
Year Ending 30 June 2026
ASX Code Grant date Expiry date
Balance at 1
July 2025
Granted during the
year
Exercised during
the year
Lapsed/ forfeited
during the year
Balance at 30 June
2026
Exercisable at 30
June 2026
PR 1 29-Mar-23 31-Mar-26 800,000 - (800,000) - - -
PR 3 29-Mar-23 31-Mar-26 800,000 - - (800,000) - -
PR 4 29-Mar-23 31-Mar-26 400,000 - - (400,000) - -
PR A 31-May-24 3-Jun-29 776,250 - - - 776,250 -
PR B 31-May-24 3-Jun-29 776,250 - - - 776,250 -
PR C 31-May-24 3-Jun-29 776,250 - (776,250) - - -
PR D 31-May-24 3-Jun-29 776,250 - - - 776,250 -
LTIP PR
24-Nov-25;
22-Dec-25
31-Dec-29 - 14,650,000 - (1,750,000) 12,900,000 -
STIP PR DIR 24-Nov-25 31-Dec-27 - 321,428 - - 321,428 -
STIP PR 8-Oct-25 31-Dec-27 - 1,296,149 (345,609) 950,540 -
Total 5,105,000 16,267,577 (1,576,250) (3,295,609) 16,500,718 -
- 88 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 24: SHARE-BASED PAYMENTS (CONTINUED)
Year Ending 30 June 2025
ASX Code Grant date Expiry date
Balance at 1
July 2024
Granted during the
year
Exercised during
the year
Capital
consolidation
movement
Lapsed during the
year
Balance at 30
June 2025
Exercisable at 30
June 2025
PR 1 29-Mar-23 31-Mar-26 20,000,000 - - (19,200,000) - 800,000 800,000
PR 2 29-Mar-23 31-Mar-26 10,000,000 - (10,000,000) - - - -
PR 3 29-Mar-23 31-Mar-26 20,000,000 - - (19,200,000) - 800,000 -
PR 4 29-Mar-23 31-Mar-26 10,000,000 - - (9,600,000) - 400,000 -
PR 5 29-Mar-23 31-Mar-26 10,000,000 - (10,000,000) - - - -
PR 6 29-Mar-23 31-Mar-26 10,000,000 - (10,000,000) - - - -
PR A 31-May-24 3-Jun-29 19,406,250 - - (18,630,000) - 776,250 -
PR B 31-May-24 3-Jun-29 19,406,250 - - (18,630,000) - 776,250 -
PR C 31-May-24 3-Jun-29 19,406,250 - - (18,630,000) - 776,250 776,250
PR D 31-May-24 3-Jun-29 19,406,250 - - (18,630,000) - 776,250 -
Total 157,625,000 - (30,000,000) (122,520,000) - 5,105,000 1,576,250
- 89 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 24: SHARE-BASED PAYMENTS (CONTINUED) Weighted average remaining contractual life
June 2026
June 2025 Options 0.59 years 1.46 years Performance Rights 3.19 years 2.68 years
Material accounting policy and significant judgment Share-based payments Share-based compensation benefits are provided to Key Management Personnel and employees.
Options
The fair value of options granted is recognised a share-based payment expense with a corresponding increase in
equity. The total amount to be expensed is determined by reference to the fair value of the options granted:
• including any market performance conditions (such as the entity’s share price)
• excluding the impact of any service and non-market performance vesting conditions (such as profitability, sales growth
targets and remaining an employee of the entity over a specified time period), and
• including the impact of any non-vesting conditions (such as the requirement for employees to save or hold shares for
a specific period of time).
The total expense is recognised over the vesting period, which is the period over which all of the specified vesting
conditions are to be satisfied. At the end of each period, the entity revises its estimates of the number of options that
are expected to vest based on the non-market vesting and service conditions. The entity recognises the impact of the
revision to original estimates, if any, in profit or loss, with a corresponding adjustment to equity.
The fair value at grant date is independently determined using the Black-Scholes Model that takes into account the exercise price, the term of the options, the impact of dilution (where material), the share price at grant date and expected price volatility of the underlying share, the expected dividend yield, the risk-free interest rate for the term of the options and the correlations and volatilities of the peer group companies.
Performance rights
The fair value of performance rights granted to employees for nil consideration is recognised as an expense over the
relevant service period. The fair value is measured at the grant date of the shares and is recognised in equity in the
share-based payment reserve. The number of shares expected to vest is estimated based on the non-market vesting
conditions. The estimates are revised at the end of each reporting period and adjustments are recognised in profit or
loss and the share-based payment reserve.
Where shares are forfeited due to a failure by the employee to satisfy the service conditions, any expenses previously recognised in relation to such shares are reversed with effect from the date of the forfeiture
Share-based payments The Group measures the cost of equity-settled transactions with suppliers by reference to the fair value of the goods or services received, provided this can be estimated reliably. If a reliable estimate cannot be made the value of the goods or services is determined indirectly by reference to the fair value of the equity instrument granted. The Group measures the cost of equity-settled transactions with employees by reference to the fair value of the equity instruments granted at grant date. The fair value of the equity instruments granted is determined using an appropriate option pricing model taking into account the terms and conditions upon which they instruments were granted. Volatility for these calculations is determined with reference to the Group’s historical volatility for a comparable or appropriate period. The accounting estimates and assumptions relating to equity-settled share-based payments would have no impact on the carrying amounts of assets and liabilities within the next annual reporting period but may impact profit or loss and equity. Please refer to Note 26 for further details.
- 90 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 25: FAIR VALUE MEASUREMENTS
Fair value hierarchy This section explains the judgements and estimates made in determining the fair values of the financial instruments that are recognised and measured at fair value in the financial statements. To provide an indication about the reliability of the inputs used in determining fair value, the Group has classified its financial instruments into the three levels prescribed under the accounting standards. An explanation of each level follows underneath the table.
June 2026 $’000 June 2025 $’000
Financial assets
Level 2 – Option premium 29,958 -
Level 3 - Other financial assets (Note 13) 3,777 3,641
There were no transfers between levels for recurring fair value measurements during the year. The Group’s policy is to recognise transfers into and out of fair value hierarchy levels as at the end of the reporting period.
Level 1: The fair value of financial instruments traded in active markets (such as publicly traded derivatives and equity securities) is based on quoted market prices at the end of the reporting period. The quoted market price used for financial assets held by the group is the current bid price. The quoted market price incorporates the market's assumptions with respect to changes in economic climate such as rising interest rates and inflation, as well as changes due to ESG risk. These instruments are included in level 1.
Level 2: The fair value of financial instruments that are not traded in an active market (e.g. over-the counter derivatives) is determined using valuation techniques that maximise the use of observable market data and rely as little as possible on entity-specific estimates. If all significant inputs required to fair value an instrument are observable, the instrument is included in level 2.
Level 3: If one or more of the significant inputs is not based on observable market data, the instrument is included in level 3. This is the case for unlisted equity securities and for instruments where environmental, social and governance risk gives rise to a significant unobservable adjustment.
Valuation techniques used to determine fair values
Specific valuation techniques used to value financial instruments include:
• discounted cash flow projections based on reliable estimates of future cash flows
Fair value measurements using significant unobservable inputs
Option Premium Level 2 Receivable Level 3 Total
$’000 $’000 $’000 Opening balance - 3,641 3,641 Additions 30,413 - 30,413 (Losses)/Gains recognised in Net loss on revaluation of financial instruments at fair value through profit and loss (455) 136 (319) Closing balance 29,958 3,777 33,735
- 91 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 25: FAIR VALUE MEASUREMENTS (CONTINUED)
Fair values The carrying value of cash and cash equivalents, other receivables, trade creditors, other creditors and accruals are considered to be a reasonable approximation of fair value. The fair value of the future contractual principal and interest cashflows associated with the bond is $173,931,000.
Material accounting policy
When an asset or liability, financial or non-financial, is measured at fair value for recognition or disclosure purposes, the fair value is based on the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date; and assumes that the transaction will take place either: in the principal market; or in the absence of a principal market, in the most advantageous market.
Fair value is measured using the assumptions that market participants would use when pricing the asset or liability, assuming they act in their economic best interests. For non-financial assets, the fair value measurement is based on its highest and best use. Valuation techniques that are appropriate in the circumstances and for which sufficient data are available to measure fair value, are used, maximising the use of relevant observable inputs and minimising the use of unobservable inputs.
Assets and liabilities measured at fair value are classified into three levels, using a fair value hierarchy that reflects the significance of the inputs used in making the measurements. Classifications are reviewed at each reporting date and transfers between levels are determined based on a reassessment of the lowest level of input that is significant to the fair value measurement.
For recurring and non-recurring fair value measurements, external valuers may be used when internal expertise is either not available or when the valuation is deemed to be significant. External valuers are selected based on market knowledge and reputation. Where there is a significant change in fair value of an asset or liability from one period to another, an analysis is undertaken, which includes a verification of the major inputs applied in the latest valuation and a comparison, where applicable, with external sources of data.
- 92 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 26: FINANCIAL RISK MANAGEMENT OBJECTIVES AND POLICIES
The Group’s overall risk management programme focuses on the unpredictability of the financial markets and seeks to minimise potential adverse effects on the financial performance of the Group. The Group uses different methods to measure and manage different types of risks to which it is exposed.
The carrying values of the Group’s financial instruments are as follows:
June 2026
$’000
June 2025
$’000
Financial assets
Financial assets at amortised cost
Cash and cash equivalents 121,983 11,664
Restricted cash 160,927 -
Trade and other receivables 934 7,124
Financial assets at fair value through profit and loss 3,777 3,641
Derivative financial instruments 29,958 -
317,579 22,429
Financial liabilities
Financial liabilities at amortised cost
Trade and other payables 30,955 31,286
Borrowings 160,149 17,505
Lease liabilities 11,830 13,468
Option premium payable 29,958 -
232,892 62,259
a) Market risk
(i) Foreign exchange risk
Foreign exchange risk arises from future commercial transactions and recognised financial assets and financial liabilities denominated in a currency that is not the entity's functional currency. The risk is measured using sensitivity analysis and cash flow forecasting. The carrying amount of the Group’s foreign currency denominated financial assets and liabilities at the reporting date were as follows:
June 2026 US$’000 June 2025 US$’000 Cash and cash equivalents 4 - Restricted cash 36,025 - Borrowings 113,303 9,331 The year-end exchange rate used to recalculate the US$ denominated balances on 30 June 2026 was 0.6869 (2025 exchange rate of 0.655).
- 93 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 26: FINANCIAL RISK MANAGEMENT OBJECTIVES AND POLICIES (CONTINUED)
a) Market risk (continued)
(i) Foreign exchange risk (continued)
The aggregate net foreign exchange gains recognised in the profit and loss were $201,000 for financial year ending 30 June 2026 (2025: $217,000).
The sensitivity of profit and loss to changes in the exchange rate is as follows:
June 2026 $’000 June 2025 $’000 AUD/USD exchange rate – increase by 5% 5,357 712 AUD/USD exchange rate – decrease by 5% (5,921) (712)
(ii) Price risk
The Group is exposed to commodity price risk arising from gold ore held for sales. The Group sells gold ore at the spot price with the price determined at the time of processing at the Laverton Mill. During the year, the Group has bought deferred put options over 60,000 ounces of gold at a strike price of $5,809/oz, whilst retaining gold price upside. The options are to be settled progressively over financial years ending 30 June 2028 and 30 June 2029. These options are classified as cash flow hedges, measured at fair value and are classified as derivative financial instruments. The deferred- premium structure allows the Group to defer payment of the option premium while obtaining the price protection over the relevant hedged volumes. Accordingly, the options mitigate the impact of declines in the AUD gold price below the strike price on cash flows from the hedged gold sales, they do not eliminate the Group's overall commodity price exposure.
The Group had the following assets and liabilities in respect of its hedging activities at 30 June 2026:
June 2026 $’000 June 2025 $’000 Current Assets Derivative financial instruments
29,958
Current Liabilities Option premium payable
29,958
If the average selling price of gold of $6,264/oz (2024: $4,938) for the financial year had increased/decreased by 10%, the change in the loss before income tax for the Group would be as follows:
June 2026 $’000 June 2025 $’000 Gold price per ounce – increase by 10% 9,102 4,127 Gold price per ounce – decrease by 10% (9,102) (4,127)
- 94 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 26: FINANCIAL RISK MANAGEMENT OBJECTIVES AND POLICIES (CONTINUED)
(ii) Price risk (continued)
Material accounting policy Derivative financial instruments
Derivative financial instruments (derivatives) are initially recognised at fair value on the date on which a derivative contract is entered into and are subsequently remeasured to fair value at the end of each reporting period. The accounting for subsequent changes in fair value depends on whether the derivative is designated as a hedging instrument and, if so, the nature of the hedge relationship. At the inception of a hedge relationship, the Group formally designates and documents the hedge relationship, including the hedging instrument and hedged item, the nature of the risk being hedged, the Group’s risk management objective and strategy for undertaking the hedge, and the economic relationship between the hedging instrument and hedged item, including whether changes in the cash flows of the hedging instrument are expected to offset changes in the cash flows of the hedged item. The Group assesses, both at the inception of the hedge relationship and on an ongoing basis, whether the hedging relationship meets the applicable hedge effectiveness requirements. The effective portion of changes in the fair value of derivatives that are designated and qualify as cash flow hedges is recognised in other comprehensive income and accumulated in the cash flow hedge reserve within equity. The gain or loss relating to the ineffective portion is recognised immediately in profit or loss within other gains/(losses). Amounts accumulated in the cash flow hedge reserve are subsequently reclassified to profit or loss in the period or periods in which the hedged forecast transaction affects profit or loss. Where the hedged forecast transaction results in the recognition of a non-financial asset or non-financial liability, the amount accumulated in the cash flow hedge reserve is removed from equity and included directly in the initial cost or other carrying amount of the asset or liability, as applicable. Where a derivative expires, is sold, terminated, or no longer qualifies for hedge accounting, or where the hedge relationship is discontinued, hedge accounting is discontinued prospectively. Any amount accumulated in the cash flow hedge reserve at that time remains in equity until the forecast transaction occurs. If the forecast transaction is no longer expected to occur, the amount accumulated in the cash flow hedge reserve is immediately reclassified to profit or loss. For cash flow hedges of forecast sales, amounts accumulated in the cash flow hedge reserve are reclassified to profit or loss when the forecast sale occurs, to achieve the appropriate matching of the hedging instrument gains or losses with the hedged transaction. Where derivatives do not qualify for hedge accounting, changes in their fair value are recognised immediately in profit or loss within other gains/(losses). Derivatives are presented as financial assets where their fair value is positive and as financial liabilities where their fair value is negative. Derivative assets and liabilities are offset only where there is a legally enforceable right to offset the recognised amounts and there is an intention to settle on a net basis or to realise the asset and settle the liability simultaneously.
- 95 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 26: FINANCIAL RISK MANAGEMENT OBJECTIVES AND POLICIES (CONTINUED)
(iii) Interest rate risk
Interest rate risk arises from the Group’s cash, cash equivalents and restricted cash earning interest at variable rates. The Group is exposed to movements in market interest rates on cash, cash equivalents and restricted cash.
In March 2026, the Group completed settlement of a US$120 million senior secured bond facility. The bond has a fixed coupon rate of 12.5% per annum resulting in nil sensitivity.
If the rate of interest on the cash, cash equivalents and restricted cash of the Group had increased/decreased by 1%, the change in the loss before income tax for the Consolidated Entity would be as follows:
June 2026 $’000 June 2025 $’000 Rate of interest – increase by 1% 2,829 117 Rate on interest – decrease by 1% (2,829) (117)
Credit risk
Credit risk is the risk of financial loss if a customer or counterparty to a financial instrument fails to meet its contractual
obligations and arises principally from the Group’s cash at bank, term deposits, restricted cash as well as credit exposure
to trade customers including outstanding receivables and committed transactions. Credit risk represents the potential
financial loss if a customer or counterparty fail to perform as contracted.
The carrying amount of financial assets represents the maximum credit exposure.
The Group limits its exposure to credit risk by only transacting with high quality financial institutions.
Capital risk management The Group’s objectives when managing capital are to: • Safeguard their ability to continue as a going concern, so that it can continue to provide returns for shareholders and benefits for other stakeholders; and • Maintain an optimal capital structure to reduce the cost of capital.
In order to maintain or adjust the capital structure, the Group may adjust the number of dividends paid to shareholders, return capital to shareholders, issue new shares or sell assets to reduce debt.
Given the stage of the Company’s development there are no formal targets set for return on capital. The Company is not subject to externally imposed capital requirements. The net equity of the Company is equivalent to capital. Net capital is obtained through capital raisings on the Australian Securities Exchange (“ASX”).
Liquidity risk Liquidity risk is the risk that the Group will not be able to meet its financial obligations as they fall due. The Group’s approach to managing liquidity is to ensure, as far as possible, that it will always have sufficient liquidity to meet its liabilities when due, under both normal and stressed conditions, without incurring unacceptable losses or risking damage to its reputation.
The Group manages liquidity risk by maintaining adequate cash reserves from funds raised in the market and by continuously monitoring forecast and actual cash flows.
- 96 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 26: FINANCIAL RISK MANAGEMENT OBJECTIVES AND POLICIES (CONTINUED)
The tables below analyse the group’s financial liabilities into relevant maturity groupings based on their contractual maturities. The amounts disclosed in the table are the contractual undiscounted cash flow.
Carrying Amount $’000 Contractual cashflows
Total $’000 Less than 6 months $’000 6-12 months $’000 1-2 years $’000 Over 2 years $’000 30 June 2026
Trade and other payables 30,955 30,955 30,955 -
Borrowings 160,149 237,702 12,258 11,675 60,121 153,648 Lease Liabilities 11,830 13,338 2,964 2,855 4,975 2,544 Option premium payable 29,958 36,969
23,060 13,909
30 June 2025
Trade and other payables 31,286 31,286 31,114 - 172
Borrowings 17,505 20,151 9,731 9,732 688
Lease liabilities 13,468 16,035 2,935 2,935 5,084 5,081
- 97 -
NOTES TO THE FINANCIAL STATEMENTS
FOR THE YEAR ENDED 30 June 2026
NOTE 27: COMMITMENTS AND CONTINGENCIES
Exploration commitments The Group has an expenditure commitment of $5,024,000 for the 2025-2026 year ($4,092,000 for the 2024-2025 year) to sustain current tenements under lease from the Department of Mines, Industry Regulation and Safety (DMIRS). The expenditure commitment includes annual tenement rentals of $1,057,000 (2025: $570,000).
Capital expenditure commitments As at 30 June 2026, the Group has capital expenditure commitment of $101,931,000 in relation to the construction of Laverton processing plant.
Contingencies As part of the acquisition of Linden Gold Alliance Limited, the Company has assumed certain royalty obligations including:
- Lord Byron Mining Pty Ltd is obliged to pay Indago Resources Ltd a royalty on all minerals derived from tenements M39/138, M39/139, M39/185 and M39/262. The royalty is equal to 2% of sale proceeds of each mineral product sold.
- Second Fortune Gold Project Pty Ltd (SFGP) is obliged to pay a NSR to Anova Royalties and Investments Pty Ltd from material mined on tenements M39/794, M39/255, M39/649, M39/650, E39/2081, E39/1977 and E39/1539. The royalty is not payable unless and until 75,000 cumulative ounces of gold have been mined and produced by SFGP from the relevant tenements. The royalty rate is 1.5% of the net smelter return from the tenements until $1 million of royalty payments have been paid then the rate reduces to 1%.
On 2 October 2024 the Company completed the acquisition of Montague East Gold Project from Gateway Mining Limited.
The Company assumed certain royalty obligations as part of this acquisition including:
- In the event Element 25 Limited relinquish their 20% interest in the tenement E57/1060, a 1.7% royalty payable to Element 25 Limited in relation to production from tenement E57/1060 (inclusive of a 0.7% gross revenue royalty and a 1% net smelter royalty) on production up to 100,000 ounces of gold or 25,000 tonnes of copper. In the event that the Company elects to continue to contribute to the Joint Venture in accordance with the Joint Venture Agreement, a 0.7% gross revenue royalty on up to 100,000 ounces of gold or 25,000 tonnes of copper. As at 30 June 2025, Element 25 Limited had not made any election in relation to its 20% remnant interest nor is there any material expenditure planned for tenement E57/1060 in the short-term; and
- 1% gross revenue royalty payable to Mining Equities Pty Ltd relating to the minerals produced on tenements E57/1145 and E53/2108. Under the sale agreement, Gateway is entitled to contingent consideration of A$2 million if either (i) a JORC-compliant Mineral Resource of at least 1.0 million ounces of gold is delineated on the tenements or (ii) a gold mining project on the tenements reaches Commercial Production. The contingent consideration is payable once only and may be satisfied in Brightstar shares or cash, subject to the terms of the agreement. As at 30 June 2026, neither milestone had been achieved. On 9 December 2024 the Company completed the acquisition of Alto Metals Limited via a Scheme of Arrangement. The Company assumed a 2% gross revenue royalty payable to Mr Stone and Mr Legendre in equal proportion relating to production from the tenements E57/1029, E57/1030, E57/1031, E57/1033, E57/1044 and any other tenement applied for or granted in renewal, substitution, variation or extension (in whole or in part) of those tenements (Royalty) which now includes M57/646, M57/647, M57/650, M57/651, M57/665, M57/652, M57/658 and M57/663. Pursuant to a Deed of Assignment and Assumption dated 9 June 2025, Mr Stone and Mr Legendre assigned their rights to Royalty to Red Hill Minerals Limited who is now the sole payee of the Royalty.
Additional historical royalties may also exist over certain tenements of the Company. Whether the obligations to pay those royalties remains is to be determined. There were no other contingencies as at 30 June 2026 other than already disclosed.
- 98 -
NOTES TO THE FINANCIAL STATEMENTS
FOR THE YEAR ENDED 30 June 2026
NOTE 28: INTEREST IN SUBSIDIARIES
Subsidiaries Brightstar Resources Limited is the ultimate Australian parent entity and ultimate parent of the Group. The consolidated financial statements include the financial statements of Brightstar Resources Limited and the subsidiaries listed in the following table. Country of % Equity Interest Name Incorporation 2026 2025 Desert Exploration Pty Ltd Australia 100% 100% Kingwest Resources Pty Ltd Australia 100% 100% Menzies Operational and Mining Pty Ltd Australia 100% 100% Goongarrie Operational and Mining Pty Ltd Australia 100% 100% Roman Kings Pty Ltd Australia 100% 100% Golden Gladiator Pty Ltd Australia 100% 100% Pax Romana Resources Pty Ltd Australia 100% 100% Linden Gold Alliance Pty Ltd Australia 100% 100% Second Fortune Gold Project Pty Ltd
Australia 100% 100% Laverton Processing Pty Ltd (i)
Australia 100% 100% Lord Byron Mining Pty Ltd
Australia 100% 100% Devon Gold Project Pty Ltd
Australia 100% 100% Red October Gold Project Pty Ltd
Australia 100% 100% Montague Gold Project Pty Ltd Australia 100% 100% Alto Metals Pty Ltd Australia 100% 100% Sandstone Exploration Pty Ltd Australia 100% 100% Aurumin Pty Ltd (ii) Australia 100% - Aurumin Australia Pty Ltd Australia 100% - Kurnod Pty Ltd Australia 100% - Aurumin Gidgee Pty Ltd Australia 100% - Aurumin Sandstone Pty Ltd Australia 100% - Sandstone Operations Pty Ltd Australia 100% - Sandstone Iron Exploration Pty Ltd Australia 100% -
(i) On 11 May 2026, the Group’s wholly owned subsidiary, Second Fortune Gold Pty Ltd, changed its name to Laverton Processing Pty Ltd. (ii) On 19 May 2026, the Group’s wholly owned subsidiary, Aurumin Ltd, changed its name and company type to Aurumin Pty Ltd.
- 99 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 28: INTEREST IN SUBSIDIARIES (CONTINUED)
Principles of consolidation
Subsidiaries are all entities over which the Group has control. The Group controls an entity where the Group has power over the investee, is exposed to, or has rights to, variable returns from its involvement with the entity and has the ability to affect those returns through its power to direct the activities of the entity. Subsidiaries are consolidated from the date on which control is transferred to the Group. They are deconsolidated from the date that control ceases.
Intercompany transactions, balance and unrealised gains and losses on transactions between Group companies are eliminated.
The consolidated financial statements incorporate the assets and liabilities of all subsidiaries of Brightstar Resource Limited (‘Company’ or ‘parent entity’) as at 30 June 2026 and the results of all subsidiaries for the year then ended. Brightstar Resources Limited and its subsidiaries together are referred to in this financial report as the Group or the consolidated entity. Changes in Brightstar’s interest in a subsidiary that do not result in a loss of control are accounted for as equity transactions. NOTE 29: RELATED PARTY DISCLOSURE
Compensation The aggregate compensation made to directors and other members of key management personnel of the consolidated entity is set out below
June 2026 $’000 June 2025 $’000 Short-term benefits 1,633,105 1,733,576 Share-based payments 623,392 770,069 Post employment benefits 114,691 143,148 Total key management personnel compensation 2,371,188 2,646,793
Transactions with related parties
Purchases from and sales to related parties are made on terms equivalent to those that prevail in arm’s length transactions.
During the year, Blue Cap Mining Pty Ltd (BCM), an entity controlled by Mr Ashley Fraser (non-executive director), provided
services to Brightstar including earthworks, mobile equipment hire, personnel and production. Expenses incurred by the
Group up until Mr Fraser’s resignation (2 December 2025) totalled $304,000 for the financial year ending 30 June 2026
(30 June 2025: $1,652,000). These rates were entered into on an arms length basis and tested in the market as fair and
reasonable rates.
Other than as outlined above, the Group did not enter into any further related party transactions with the Director, key management personnel or their related entities.
- 100 -
NOTES TO THE FINANCIAL STATEMEMENTS
FOR THE YEAR ENDED 30 June 2026
NOTE 30: PARENT ENTITY DISCLOSURES
Set out below is the summarised financial information of Brightstar Resources Limited, the parent entity of the Group. The
Group’s accounting policies are applied consistently across all entities within the Group, unless otherwise stated.
June 2026
$’000
June 2025
$’000
Assets
Current assets 284,547 7,231
Non-current assets 307,737 170,314
Total assets 592,284 177,545
Liabilities
Current liabilities 15,746 23,102
Non-current liabilities 203,620 8,270
Total liabilities 219,366 31,372
Equity
Issued capital 549,621 255,012
Accumulated losses (196,458) (119,528)
Share based payments reserves 19,755 10,688
Total equity 372,918 146,172
Total profit and other comprehensive loss for the year (after tax) (48,568) (70,098)
Commitments and Contingencies of the parent entity
Commitments and contingencies of the parent entity are the same as those of the Group (Note 27).
- 101 -
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE YEAR ENDED 30 June 2026 NOTE 31: EVENTS AFTER THE BALANCE DATE
On 9 July 2026, the Company executed a binding term sheet to purchase a camp in Laverton for the purchase price of $10,300,000.
NOTE 32: AUDITORS’ REMUNERATION
During the financial year the following fees were paid or payable for services provided by KPMG (2025: Pitcher Partners BA&A Pty Ltd), the auditors of the company, and its subsidiaries.
June 2026
$’000
June 2025
$’000
Audit services - KPMG
Audit or review of the financial statements 180 -
Audit services - Pitcher Partners BA&A Pty Ltd
Audit or review of the financial statements - 130
Other Services - Pitcher Partners BA&A Pty Ltd or related
entities
Taxation compliance services 35 53 215 183
- 102 -
CONSOLIDATED ENTITY DISCLOSURE STATEMENT
Basis of preparation This consolidated entity disclosure statement (CEDS) has been prepared in accordance with the Corporations Act 2001 and includes information for each entity that was part of the consolidated entity as at the end of the financial year in accordance with AASB 10 Consolidated Financial Statements. Determination of tax residency Section 295 (3B)(a) of the Corporation Act 2001 defines tax residency as having the meaning in the Income Tax Assessment Act 1997. The determination of tax residency involves judgement as there are different interpretations that could be adopted, and which could give rise to a different conclusion on residency. In determining tax residency, the consolidated entity has applied the following interpretations: • Australian tax residency The consolidated entity has applied current legislation and judicial precedent, including having regard to the Tax Commissioner's public guidance in Tax Ruling TR 2018/5 • Foreign tax residency Where necessary, the consolidated entity has used independent tax advisers in foreign jurisdictions to assist in its determination of tax residency to ensure applicable foreign tax legislation has been complied with (see section 295(3A)(vii) of the Corporations Act 2001).
Company name Type of entity % of share capital as at 30 June 2026 Country of incorporation Country of tax residency Brightstar Resources Limited (Holding company) Body corporate - Australia Australia Desert Exploration Pty Ltd Body corporate 100% Australia Australia Kingwest Resources Pty Ltd Body corporate 100% Australia Australia Roman Kings Pty Ltd Body corporate 100% Australia Australia Golden Gladiator Pty Ltd Body corporate 100% Australia Australia Pax Romana Resources Pty Ltd Body corporate 100% Australia Australia Menzies Operational and Mining Pty Ltd Body corporate 100% Australia Australia Goongarrie Operational and Mining Pty Ltd Body corporate 100% Australia Australia Linden Gold Alliance Pty Ltd Body corporate 100% Australia Australia Laverton Processing Pty Ltd (i) Body corporate 100% Australia Australia Second Fortune Gold Project Pty Ltd Body corporate 100% Australia Australia Lord Byron Mining Pty Ltd Body corporate 100% Australia Australia Devon Gold Project Pty Ltd Body corporate 100% Australia Australia Red October Gold Project Pty Ltd Body corporate 100% Australia Australia Montague Gold project Pty Ltd Body corporate 100% Australia Australia Alto Metals Pty Ltd Body corporate 100% Australia Australia Sandstone Exploration Pty Ltd Body corporate 100% Australia Australia Aurumin Pty Ltd (ii) Body corporate 100% Australia Australia Aurumin Australia Pty Ltd Body corporate 100% Australia Australia Kurnod Pty Ltd Body corporate 100% Australia Australia Aurumin Gidgee Pty Ltd Body corporate 100% Australia Australia Aurumin Sandstone Pty Ltd Body corporate 100% Australia Australia Sandstone Operations Pty Ltd Body corporate 100% Australia Australia Sandstone Iron Exploration Pty Ltd Body corporate 100% Australia Australia
(i) On 11 May 2026, the Group’s wholly owned subsidiary, Second Fortune Gold Pty Ltd, changed its name to Laverton Processing Pty Ltd. (ii) On 19 May 2026, the Group’s wholly owned subsidiary, Aurumin Ltd, changed its name and company type to Aurumin Pty Ltd.
At the end of the financial year, no entity within the Group was a trustee of a trust within the Group, a partner in a partnership within the Group, or a participant in a joint venture within the Group.
- 103 -
DIRECTORS’ DECLARATION
- In the opinion of the directors of Brightstar Resources Limited (the ‘Company’): a. the accompanying financial statements, notes and the additional disclosures of the Group are in accordance with the Corporations Act 2001 including:
i. giving a true and fair view of the Group’s financial position as at 30 June 2026 and of its performance for the year then ended; and ii. complying with Australian Accounting Standards (including the Australian Accounting Interpretations) and the Corporations Regulations 2001; and b. there are reasonable grounds to believe that the Group will be able to pay its debts as and when they become due and payable. c. the financial statements and notes thereto are in accordance with International Financial Reporting Standards issued by the International Accounting Standards Board. d. the consolidated entity disclosure statement required by 295(3A) of the Corporations Act 2001, included on page 104, is true and correct. 2. This declaration has been made after receiving the declarations required to be made to the directors in accordance with Section 295A of the Corporations Act 2001 for the financial year ended 30 June 2026.
This declaration is signed in accordance with a resolution of the Board of Directors pursuant to S.295 (5) of the Corporations Act 2001.
Richard Crookes Chairman Dated this 3 rd day of September, 2026
KPMG, an Australian partnership and a member firm of the KPMG global organisation of independent member firms affiliated
with KPMG International Limited, a private English company limited by guarantee. All rights reserved. The KPMG name and
logo are trademarks used under license by the independent member firms of the KPMG global organisation. Liability limited by
a scheme approved under Professional Standards Legislation.
Independent Auditor’s Report
To the shareholders of Brightstar Resources Limited
Report on the audit of the Financial Report
Opinion
We have audited the
Financial Report
of
Brightstar Resources Limited (the
Company).
In our opinion, the accompanying Financial
Report of the Company gives a true and
fair view, including of the
Group
’s
financial position as at 30 June 2026 and
of its financial performance for the year
then ended, in accordance with the
Corporations Act 2001, in compliance with
Australian Accounting Standards and the
Corporations Regulations 2001.
The Financial Report comprises
:
•Consolidated Statement of financial position as at 30
June 2026;
•Consolidated Statement of profit or loss and other
comprehensive income, Consolidated Statement of
changes in equity,
and Consolidated Statement of
cash flows for the year then ended;
•Consolidated entity disclosure statement and
accompanying basis of preparation as at 30 June
2026;
•Notes, including material accounting policies;
•Directors’ Declaration.
The
Grou
p
consists of the Company and the entities it
controlled at the year end or from time to time during
the financial year.
Basis for opinion
We conducted our audit in accordance with Australian Auditing Standards. We believe that the audit
evidence we have obtained is sufficient and appropriate to provide a basis for our opinion.
Our responsibilities under those standards are further described in the Auditor’s responsibilities for
the audit of the Financial Report section of our report.
We are independent of the Group in accordance with the auditor independence requirements of the
Corporations Act 2001 and the ethical requirements of the APES 110 Code of Ethics for Professional
Accountants (including Independence Standards) issued by the Accounting Professional & Ethical
Standards Board Limited (the Code) that are relevant to audits of the financial report of public interest
entities in Australia. We have fulfilled our other ethical responsibilities in accordance with these
requirements.
- 104 -
Key Audit Matters Key Audit Matters are those matters that, in our professional judgement, were of most significance in our audit of the Financial Report of the current period. This matter was addressed in the context of our audit of the Financial Report as a whole, and in forming our opinion thereon, and we do not provide a separate opinion on this matter. Acquisition of Aurumin Limited (Asset Acquisition) - $73,883k
Refer to note 18 of the Financial Report
The key audit matter
How the matter was addressed in our audit
Acquisition of Aurumin Limited (Asset Acquisition) is a key audit matter due to: •The significance of the Group's acquisition of Aurumin Limited in the current year for consideration of $73.9m; •The Group’s judgement and complexity in determining the accounting approach of the acquisition constituted an asset acquisition or a business combination (in accordance with AASB 3 Business Combinations); and •The significant audit effort and complexity in assessing the Group’s judgements relating to the determination of the allocation of consideration to the acquired assets and liabilities, specifically exploration and evaluation assets. Our procedures included: Inspecting the Asset Acquisition contracts and related key acquisiti on transaction documents to:
Und erstand the key terms and conditions of the acquisition and nature of the assets and liabilities acquired, and
Assess the appropriateness of the Group’s accounting treatment of the asset acquisition against the requirements of the accounting standards and the Group’s accounting policies. Te sting the accuracy of the calculation and measurement of consideration paid for the acquisition based on the underlying acquisition transaction documents. Evalu ating the valuation methodology and assumptions used to determine the allocation of consideration to assets and liabilities acquired, considering accounting standard requirements and observed industry practices. For exploration and evaluation assets, comparing the cost per ounce to independently obtained publicly available cost per ounce data for comparable transactions. Assessing the Group's disclosures in the financial report using our understanding obtained from our testing, against the requirements of the accounting standards.
- 105 -
Other Information
Other Information is financial and non-financial information in Brightstar Resources Limited’s annual
report which is provided in addition to the Financial Report and the Auditor's Report. The Directors
are responsible for the Other Information.
Our opinion on the Financial Report does not cover the Other Information and, accordingly, we do not
express an audit opinion or any form of assurance conclusion thereon, with the exception of the
Remuneration Report and our related assurance opinion.
In connection with our audit of the Financial Report, our responsibility is to read the Other
Information. In doing so, we consider whether the Other Information is materially inconsistent with
the Financial Report or our knowledge obtained in the audit, or otherwise appears to be materially
misstated.
We are required to report if we conclude that there is a material misstatement of this Other
Information, and based on the work we have performed on the Other Information that we obtained
prior to the date of this Auditor’s Report we have nothing to report.
Responsibilities of the Directors for the Financial Report
The Directors are responsible for:
Preparing the Financial Report in accordance with the Corporations Act 2001, including giving a
true and fair view of the financial position and performance of the Group, and in compliance with
Australian Accounting Standards and the Corporations Regulations 2001
Implementing necessary internal control to enable the preparation of a Financial Report in
accordance with the Corporations Act 2001, including giving a true and fair view of the financial
position and performance of the Group, and that is free from material misstatement, whether due
to fraud or error
Assessing the Group and Company’s ability to continue as a going concern and whethe
r the use
of the going concern basis of accounting is appropriate. This includes disclosing, as applicable,
matters related to going concern and using the going concern basis of accounting unless they
either intend to liquidate the Group and Company or to cease operations, or have no realistic
alternative but to do so.
Auditor’s responsibilities for the audit of the Financial Report
Our objective is:
To obtain reasonable assurance about whether the Financial Report as a whole is free from
material misstatement, whether due to fraud or error; and
To issue an Auditor’s Report that includes our opinion.
Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in
accordance with Australian Auditing Standards will always detect a material misstatement when it
exists.
Misstatements can arise from fraud or error. They are considered material if,
individually or in the
aggregate, they could reasonably be expected to influence the economic decisions of users taken on
the basis of the Financial Report.
A further description of our responsibilities for the audit of the Financial Report is located at the
Auditing and Assurance Standards Board website at:
https://www.auasb.gov.au/media/bwvjcgre/ar1_2024.pdf This description forms part of our Auditor’s
Report.
- 106 - .
Report on the Remuneration Report
Opinion
In our opinion, the Remuneration Report
of Brightstar Resources Limited for the
year ended 30 June 2026, complies with
Section 300A of the Corporations Act
2001.
Directors’ responsibilities
The Directors of the Company are responsible for the
preparation and presentation of the Remuneration
Report in accordance with Section 300A of the
Corporations Act 2001.
Our responsibilities
We have audited the Remuneration Report included in
pages 28 to 43 of the Directors’ report for the year
ended 30 June 2026.
Our responsibility is to express an opinion as to whether
the Remuneration Report complies in all material
respects with Section 300A of the Corporations Act
2001, based on our audit conducted in accordance with
Australian Auditing Standards.
PAR_SIG_01 PAR_NAM_01 PAR_POS_01 PAR_DAT_01 PAR_CIT_01
KPMGGlenn Diedrich
Partne
r
Perth
3 Septembe
r 2026
-
107 -
-
108 -
CORPORATE GOVERNANCE STATEMENT
The Company’s charters, policies and procedures are regularly reviewed and updated to comply with law and best practice. These charters and policies as well as the Company’s Corporate Governance Statement can be viewed on the Company’s website located at www.brightstarresources.com.au. The Company is committed to applying the ASX Corporate Governance Council’s Corporate Governance Principles (4th Edition) (ASX Principles and Recommendations) and the Corporate Governance Statement discloses the extent to which the entity has followed the recommendations set by the ASX Corporate Governance Council during the financial year ended 30 June 2026.
- 109 -
ASX ADDITIONAL INFORMATION
Additional information required by the Australian Stock Exchange Limited and not disclosed elsewhere in this report is set out below. This information is effective as at 1 September 2026.
Distribution of Shares Range Number of Holders Securities Held 1 – 1,000 1,598 902,354 1,001 – 5,000 4,684 12,400,344 5,001 – 10,000 2,174 17,138,256 10,001 – 100,000 4,935 171,466,493 100,001 over 952 901,759,751 Rounding Total 14,343 1,103,667,198
The number of shareholdings held in less than marketable parcels is 1,037 shareholders amounting to 367,601 shares.
Top 20 Largest Shareholders Rank Shareholder Shares Held % of Issued Capital 1 CITICORP NOMINEES PTY LIMITED 151,616,777 13.74 2 J P MORGAN NOMINEES AUSTRALIA PTY LIMITED 76,462,576 6.93 3 HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED 52,313,105 4.74 4 HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED <GSCO CUSTOMERS A/C> 48,300,000 4.38 5 BNP PARIBAS NOMINEES PTY LTD <IB AU NOMS RETAILCLIENT> 33,881,162 3.07 6 LION SELECTION GROUP LIMITED 27,388,311 2.48 7 MR JACK ZEEV YETIV 24,966,310 2.26 8 WARBONT NOMINEES PTY LTD <UNPAID ENTREPOT A/C> 22,891,778 2.07 9 PATRONUS INVEST PTY LTD 21,307,332 1.93 10 BELL POTTER NOMINEES LTD <BB NOMINEES A/C> 14,556,114 1.32 11 MR ANTONIUS JOSEPH SMIT 14,000,000 1.27 12 TREASURY SERVICES GROUP PTY LTD <NERO RESOURCE FUND A/C> 13,490,025 1.22 13 BNP PARIBAS NOMS PTY LTD <GLOBAL MARKETS> 10,991,106 1.00 14 MR GREGORY OWEN JOSEPH O'MAHONEY 8,500,000 0.77 15 GENESIS MINERALS LIMITED 8,391,074 0.76 16 NEWECONOMY COM AU NOMINEES PTY LIMITED <900 ACCOUNT> 8,016,821 0.73 17 BNP PARIBAS NOMS PTY LTD 7,201,893 0.65 18 FINCLEAR SERVICES NOMINEES PTY LIMITED <ACCUM A/C> 6,288,489 0.57 19 SHARESIES AUSTRALIA NOMINEE PTY LIMITED 5,536,221 0.50 20 MOLATE PTY LIMITED <ALLAN HAIN RETIRE FUND A/C> 5,500,000 0.50 Total Top 20 Holders 561,599,094 50.88 Total Remaining Holders 542,068,104 49.12 Total Ordinary Shares on Issue 1,103,667,198 100
Substantial Shareholders As of 1 September 2026, Brightstar Resources Limited has no substantial shareholders with relevant interests of 5% or more of the full-paid ordinary shares on issue.
- 110 -
ASX ADDITIONAL INFORMATION (Continued)
Voting Rights: One vote for each ordinary share held in accordance with the Company’s Memorandum and Articles of Association. Unlisted Options and Share Performance Rights do not carry any voting rights.
On-Market Buy-Back: There is no current on-market buy-back.
Restricted Securities: As of 1 September 2026, the Company currently has no restricted securities held in escrow.
Unquoted Securities The Company had the following unquoted securities on issue as at 1 September 2026:
Type of Securities Date of Expiry Exercise Price ($) Number of Securities Number of Holders Options 22 December 2026 0.24 8,626,128 1 Options 1 July 2027 0.625 800,000 1 Options 1 July 2027 0.875 800,000 1 Options 19 July 2027 0.75 1,000,000 1 Options 31 July 2027 0.24 6,071,327 5 Options 19 July 2028 1.00 1,000,000 1 Options 31 July 2028 0.24 1,554,852 4 Performance Rights 3 June 2029 Nil 2,328,750 2 Performance Rights 31 December 2027 Nil 526,942 16 Performance Rights 31 December 2029 Nil 12,500,000 16
- 111 -
ASX ADDITIONAL INFORMATION (Continued)
Tenement Schedule at 1 September 2026
Project Tenement ID Status Registered Holder / Applicant Interest / Ownership Laverton E38/2452 Granted Brightstar Resources Limited 100% Laverton E38/2894 Granted Brightstar Resources Limited 100% Laverton E38/3198 Granted Brightstar Resources Limited 100% Laverton E38/3279 Granted Brightstar Resources Limited 100% Laverton E38/3331 Granted Brightstar Resources Limited 100% Laverton E38/3434 Granted Brightstar Resources Limited 100% Laverton E38/3438 Granted Brightstar Resources Limited 100% Laverton E38/3500 Granted Brightstar Resources Limited 100% Laverton E38/3504 Granted Brightstar Resources Limited 100% Laverton E38/3673 Granted Brightstar Resources Limited 100% Laverton E38/4070 Application Brightstar Resources Limited 100% Laverton E38/4071 Application Brightstar Resources Limited 100% Laverton E39/1539 Granted Second Fortune Gold Project Pty Ltd 1 100% Laverton E39/1977 Granted Second Fortune Gold Project Pty Ltd 1 100% Laverton E39/2081 Granted Second Fortune Gold Project Pty Ltd 1 100% Laverton E39/2385 Application Lord Byron Mining Pty Ltd 1 100% Laverton E39/2386 Application Lord Byron Mining Pty Ltd 1 100% Laverton E39/2387 Application Lord Byron Mining Pty Ltd 1 100% Laverton E39/2592 Application Lord Byron Mining Pty Ltd 1 100% Laverton G38/39 Granted Brightstar Resources Limited 100% Laverton G38/41 Application Brightstar Resources Limited 100% Laverton L38/100 Granted Brightstar Resources Limited 100% Laverton L38/120 Granted Lord Byron Mining Pty Ltd 1 100% Laverton L38/123 Granted Brightstar Resources Limited 100% Laverton L38/154 Granted Brightstar Resources Limited 100% Laverton L38/163 Granted Lord Byron Mining Pty Ltd 1 100% Laverton L38/164 Granted Lord Byron Mining Pty Ltd 1 100% Laverton L38/168 Granted Brightstar Resources Limited 100% Laverton L38/169 Granted Brightstar Resources Limited 100% Laverton L38/171 Granted Brightstar Resources Limited 100% Laverton L38/185 Granted Brightstar Resources Limited 100% Laverton L38/188 Granted Brightstar Resources Limited 100% Laverton L38/205 Granted Brightstar Resources Limited 100% Laverton L38/384 Application Brightstar Resources Limited 100% Laverton L38/401 Granted Brightstar Resources Limited 100% Laverton L38/403 Application Brightstar Resources Limited 100% Laverton L38/404 Application Brightstar Resources Limited 100% Laverton L38/405 Application Lord Byron Mining Pty Ltd 1 100% Laverton L38/406 Application Lord Byron Mining Pty Ltd 1 100% Laverton L38/407 Granted Lord Byron Mining Pty Ltd 1 100% Laverton L38/410 Application Lord Byron Mining Pty Ltd 1 100%
- 112 -
ASX ADDITIONAL INFORMATION (Continued)
Tenement Schedule at 1 September 2026 (Continued)
Project Tenement ID Status Registered Holder / Applicant Interest / Ownership Laverton L39/12 Granted Second Fortune Gold Project Pty Ltd 1 100% Laverton L39/124 Granted Lord Byron Mining Pty Ltd 1 100% Laverton L39/13 Granted Second Fortune Gold Project Pty Ltd 1 100% Laverton L39/14 Granted Second Fortune Gold Project Pty Ltd 1 100% Laverton L39/214 Granted Lord Byron Mining Pty Ltd 1 100% Laverton L39/230 Granted Second Fortune Gold Project Pty Ltd 1 100% Laverton M38/1056 Granted Brightstar Resources Limited 100% Laverton M38/1057 Granted Brightstar Resources Limited 100% Laverton M38/1058 Granted Brightstar Resources Limited 100% Laverton M38/241 Granted Brightstar Resources Limited 100% Laverton M38/314 Granted Brightstar Resources Limited 100% Laverton M38/346 Granted Brightstar Resources Limited 100% Laverton M38/381 Granted Brightstar Resources Limited 100% Laverton M38/549 Granted Brightstar Resources Limited 100% Laverton M38/9 Granted Brightstar Resources Limited 100% Laverton M38/917 Granted Brightstar Resources Limited 100% Laverton M38/918 Granted Brightstar Resources Limited 100% Laverton M38/94 Granted Brightstar Resources Limited 100% Laverton M38/95 Granted Brightstar Resources Limited 100% Laverton M38/968 Granted Desert Exploration Pty Ltd 1 100% Laverton M38/984 Granted Brightstar Resources Limited 100% Laverton M39/138 Granted Lord Byron Mining Pty Ltd 1 100% Laverton M39/139 Granted Lord Byron Mining Pty Ltd 1 100% Laverton M39/185 Granted Lord Byron Mining Pty Ltd 1 100% Laverton M39/255 Granted Second Fortune Gold Project Pty Ltd 1 100% Laverton M39/262 Granted Lord Byron Mining Pty Ltd 1 100% Laverton M39/649 Granted Second Fortune Gold Project Pty Ltd 1 100% Laverton M39/650 Granted Second Fortune Gold Project Pty Ltd 1 100% Laverton M39/794 Granted Second Fortune Gold Project Pty Ltd 1 100% Laverton P38/4433 Granted Brightstar Resources Limited 100% Laverton P38/4444 Granted Brightstar Resources Limited 100% Laverton P38/4446 Granted Brightstar Resources Limited 100% Laverton P38/4447 Granted Brightstar Resources Limited 100% Laverton P38/4448 Granted Brightstar Resources Limited 100% Laverton P38/4449 Granted Brightstar Resources Limited 100% Laverton P38/4450 Granted Brightstar Resources Limited 100% Laverton P38/4508 Granted Brightstar Resources Limited 100% Laverton P38/4545 Granted Brightstar Resources Limited 100% Laverton P38/4546 Granted Brightstar Resources Limited 100% Laverton P38/4558 Granted Brightstar Resources Limited 100% Menzies E29/1062 Granted Goongarrie Operational & Mining Pty Ltd 2 100% Menzies E29/966 Granted Goongarrie Operational & Mining Pty Ltd 2 100%
- 113 -
ASX ADDITIONAL INFORMATION (Continued)
Tenement Schedule at 1 September 2026 (Continued)
Project Tenement ID Status Registered Holder / Applicant Interest / Ownership Menzies E29/981 Granted Kalgoorlie Nickel Pty Ltd 100% Gold & Lithium rights Menzies E29/996 Granted Goongarrie Operational & Mining Pty Ltd 2 100% Menzies L29/42 Granted Menzies Operational & Mining Pty Ltd 100% Menzies L29/43 Granted Menzies Operational & Mining Pty Ltd 100% Menzies L29/44 Granted Menzies Operational & Mining Pty Ltd 100% Menzies M29/14 Granted Menzies Operational & Mining Pty Ltd 100% Menzies M29/153 Granted Menzies Operational & Mining Pty Ltd 100% Menzies M29/154 Granted Menzies Operational & Mining Pty Ltd 100% Menzies M29/184 Granted Menzies Operational & Mining Pty Ltd 100% Menzies M29/212 Granted Menzies Operational & Mining Pty Ltd 100% Menzies M29/410 Granted Menzies Operational & Mining Pty Ltd 100% Menzies M29/88 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2380 Granted Kalgoorlie Nickel Pty Ltd 2,3 100% Gold rights Menzies P29/2381 Granted Goongarrie Operational & Mining Pty Ltd 2 100% Menzies P29/2412 Granted Goongarrie Operational & Mining Pty Ltd 2 100% Menzies P29/2413 Granted Goongarrie Operational & Mining Pty Ltd 2 100% Menzies P29/2450 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2467 Granted Kalgoorlie Nickel Pty Ltd 2,3 100% Gold rights
Menzies P29/2468 Granted Kalgoorlie Nickel Pty Ltd 2,3 100% Gold rights Menzies P29/2511 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2512 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2513 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2514 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2515 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2530 Granted Kalgoorlie Nickel Pty Ltd 2,3 100% Gold rights Menzies P29/2531 Granted Goongarrie Operational & Mining Pty Ltd 2 100% Menzies P29/2532 Granted Kalgoorlie Nickel Pty Ltd 2,3 100% Gold rights Menzies P29/2533 Granted Goongarrie Operational & Mining Pty Ltd 2 100% Menzies P29/2538 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2539 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2578 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2579 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2580 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2581 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2582 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2583 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2584 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2585 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2588 Granted Goongarrie Operational & Mining Pty Ltd 2 100% Menzies P29/2649 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2650 Granted Menzies Operational & Mining Pty Ltd 100% Menzies P29/2651 Granted Menzies Operational & Mining Pty Ltd 100%
- 114 -
ASX ADDITIONAL INFORMATION (Continued)
Tenement Schedule at 1 September 2026 (Continued)
Project Tenement ID Status Registered Holder / Applicant Interest / Ownership Menzies P29/2656 Granted Goongarrie Operational & Mining Pty Ltd 2 100% Menzies P29/2675 Application Goongarrie Operational & Mining Pty Ltd 2 100% Menzies P29/2676 Application Goongarrie Operational & Mining Pty Ltd 2 100% Sandstone E53/2108 Granted Gateway Mining Limited 5 100% Sandstone E53/2340 Granted Gateway Mining Limited 5 100% Sandstone E57/1004 Granted Gateway Mining Limited 5 100% Sandstone E57/1005 Granted Gateway Mining Limited 5 100% Sandstone E57/1029 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone E57/1030 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone E57/1031 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone E57/1033 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone E57/1044 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone E57/1060 Granted Gateway Mining Limited / Element 25 Limited 80% 6
Sandstone E57/1072 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone E57/1095 Granted Gateway Mining Limited 5 100% Sandstone E57/1101 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone E57/1102 Granted Sandstone Operations Pty Ltd 100% Sandstone E57/1108 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone E57/1113 Granted Gateway Mining Limited 5 100% Sandstone E57/1140 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1145 Granted Gateway Mining Limited 5 100% Sandstone E57/1147 Granted Gateway Mining Limited 5 100% Sandstone E57/1215 Granted Gateway Mining Limited 5 100% Sandstone E57/1224 Granted Sandstone Operations Pty Ltd 100% Sandstone E57/1225 Granted Sandstone Operations Pty Ltd 100% Sandstone E57/1228 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone E57/1254 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1273 Granted Aurumin Gidgee Pty Ltd 100% Sandstone E57/1279 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1294 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1296 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1302 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1315 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1317 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1360 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1366 Application Aurumin Sandstone Pty Ltd 0% 7
Sandstone E57/1371 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1373 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1374 Application Aurumin Sandstone Pty Ltd 0% 7
Sandstone E57/1375 Granted Aurumin Sandstone Pty Ltd 0% 7
Sandstone E57/1396 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1413 Granted Aurumin Sandstone Pty Ltd 100%
- 115 -
ASX ADDITIONAL INFORMATION (Continued)
Tenement Schedule at 1 September 2026 (Continued)
Project Tenement ID Status Registered Holder / Applicant Interest / Ownership Sandstone E57/1416 Granted Aurumin Gidgee Pty Ltd 100% Sandstone E57/1417 Granted Aurumin Gidgee Pty Ltd 100% Sandstone E57/1423 Application Gateway Mining Limited 5 100% Sandstone E57/1424 Granted Gateway Mining Limited 5 100% Sandstone E57/1441 Granted Gateway Mining Limited 5 100% Sandstone E57/1453 Granted Gateway Mining Limited 5 100% Sandstone E57/1462 Granted Aurumin Sandstone Pty Ltd 100% Sandstone E57/1465 Granted Gateway Mining Limited 5 100% Sandstone E57/1466 Granted Gateway Mining Limited 5 100% Sandstone E57/405 Granted Gateway Mining Limited 5 100% Sandstone E57/417 Granted Gateway Mining Limited 5 100% Sandstone E57/687 Granted Gateway Mining Limited 5 100% Sandstone E57/793 Granted Gateway Mining Limited / Estuary Resources Pty Ltd 75% 6
Sandstone E57/807 Granted Gateway Mining Limited 5 100% Sandstone E57/823 Granted Gateway Mining Limited 5 100% Sandstone E57/824 Granted Gateway Mining Limited 5 100% Sandstone E57/874 Granted Gateway Mining Limited 5 100% Sandstone E57/875 Granted Gateway Mining Limited 5 100% Sandstone E57/888 Granted Gateway Mining Limited 5 100% Sandstone E57/945 Granted Gateway Mining Limited 5 100% Sandstone L57/67 Application Sandstone Operations Pty Ltd 100% Sandstone L57/78 Application Sandstone Exploration Pty Ltd 4 100% Sandstone M57/128 Granted Sandstone Operations Pty Ltd 100% Sandstone M57/129 Granted Sandstone Operations Pty Ltd 100% Sandstone M57/217 Granted Gateway Mining Limited 100% Sandstone M57/352 Granted Aurumin Gidgee Pty Ltd 100% Sandstone M57/429 Granted Gateway Mining Limited / Estuary Resources Pty Ltd 75% 6
Sandstone M57/48 Granted Gateway Mining Limited 5 100% Sandstone M57/485 Granted Gateway Mining Limited / Estuary Resources Pty Ltd 75% 6
Sandstone M57/646 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone M57/647 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone M57/650 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone M57/651 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone M57/652 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone M57/654 Granted Sandstone Operations Pty Ltd 100% Sandstone M57/658 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone M57/663 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone M57/665 Granted Sandstone Exploration Pty Ltd 4 100% Sandstone M57/98 Granted Gateway Mining Limited 5 100% Sandstone M57/99 Granted Gateway Mining Limited 5 100% Sandstone P57/1442 Granted Sandstone Operations Pty Ltd 100%
- 116 -
ASX ADDITIONAL INFORMATION (Continued)
Tenement Schedule at 1 September 2026 (Continued)
Project Tenement ID Status Registered Holder / Applicant Interest / Ownership Sandstone P57/1494 Application Gateway Mining Limited 5 100% Sandstone P57/1495 Application Gateway Mining Limited 5 100% Sandstone P57/1496 Application Gateway Mining Limited 5 100% Sandstone P57/1529 Granted Sandstone Exploration Pty Ltd 4 100%
1 Desert Exploration Pty Ltd, Second Fortune Gold Project Pty Ltd and Lord Byron Mining Pty Ltd are wholly-owned subsidiaries of Brightstar Resources Ltd. 2 These tenements relate to a Joint Venture with Cazaly Resources Ltd. Refer to Brightstar announcement dated 12 February 2025. 3 Brightstar retains the Gold Rights for Tenements P29/2380, P29/2467, P29/2468, P29/2530 and P29/2532 which are held by Kalgoorlie Nickel Pty Ltd. Refer to Brightstar announcement dated 17 July 2023. 4 Sandstone Exploration Pty Ltd is a wholly owned subsidiary of Brightstar Resources Ltd. 5 All tenements held by Gateway Mining Ltd (including Gateway Projects WA Pty Ltd) are being transferred to Montague Gold Project Pty Ltd, a wholly owned subsidiary of Brightstar Resources Ltd. 6 E57/1060 are subject to a joint venture agreement, whereby the Company holds an 80% interest and Element 25 Limited holds the remaining 20% interest. M57/429, M57/485 and E57/793 are subject to a joint venture agreement, whereby the Company holds a 75% interest and Estuary Resources holds the remaining 25% interest. E57/405, E57/687, E57/793, E57/793, E57/823, E57/824, E57/875, E57/888, M57/217, M57/48, M57/485, M57/98, M57/99, P57/1409, P57,1410, P57/1411 and P57/1413 are subject to a farm-in joint venture agreement with Premier 1 Lithium Limited (ASX:PLC), whereby PLC will the right to acquire an 80% interest in the lithium rights (and related by-products). The Company retains the precious metals rights. 7 These tenements are the subject of pending ballot proceedings.
BRIGHTSTAR RESOURCES LIMITED Building a Multi-Asset Western Australian Gold Producer Executing on a pathway to +75koz p.a. with a Tier-1 growth asset in the Go Bay ASX : BTR INVESTOR PRESENTATION · AUGUST 2026
Important Notices & Disclaimers Important Notices •Thispresentation(Presentation)hasbeenpreparedbyBrightstarandhasbeenauthorisedforreleasebytheBoardofDirectorsofBrightstaronthebasisitistobereadinconjunctionwiththeseimportantnoticesanddisclaimers. •ThisPresentationdated5August2026hasbeenpreparedbythemanagementofBrightstarResourcesLimited(ACN100727491)(“B ”,“Brightstar”or“ ompany”). Disclaimer •ThisPresentationhasbeenpreparedbyBrightstarbasedoninformationfromitsownandthird-partysourcesandisnotadisclosuredocument.NopartyotherthanBrightstarhasauthorisedorcausedtheissue,lodgement,submission, despatchorprovisionofthisPresentation,ortakesanyresponsibilityfor,ormakesorpurportstomakeanystatements,representationsorundertakingsinthisPresentation.Exceptforanyliabilitythatcannotbeexcludedbylaw,Brightstar anditsrespectiverelatedbodiescorporate,directors,employees,advisersandagentsdisclaimandacceptnoresponsibilityorliabilityforanyexpenses,losses,damagesorcostsincurredbyanypartyrelatinginanywaytothisPresentation including,reliancewithoutlimitation,theinformationcontainedinorprovidedinconnectionwithit,anyerrorsoromissionsfromithowevercaused,lackofaccuracy,completeness,currencyorreliabilityoryouoranyotherpersonplacinganyon thisPresentation,itsaccuracy,completeness,currencyorreliability. •ThisPresentationisnotaprospectus,disclosuredocumentorotherofferingdocumentunderAustralianlaworunderanyotherlaw.Itisprovidedforinformationpurposesandisnotaninvitationnorofferofsharesorrecommendationfor subscription,purchaseorsaleinanyjurisdiction.ThisPresentationdoesnotpurporttocontainalltheinformationthataprospectiveinvestormayrequireinconnectionwithanypotentialinvestmentinBrightstar.Eachrecipientmust makeitsownindependentassessmentofBrightstarbeforemakinganinvestmentdecision. Forward-Looking Statements •ThisPresentationcontainscertain"forward-lookingstatements".Thewords"expect","anticipate","estimate","intend","believe","guidance","should","could","may","will","predict","plan"andothersimilarexpressionsareintendedtoidentify forward-lookingstatements.Indicationsof,andguidanceon,futurefinancialpositionorperformancearealsoforward-lookingstatements.Forward-lookingstatements,opinionsandestimatesprovidedinthisPresentationarebasedon assumptionsandcontingencieswhicharesubjecttochangewithoutnoticeandinvolveknownandunknownrisksandcertaintiesandotherfactorswhicharebeyondthecontrolofBrightstaranditsdirectorsandmanagement.Forward-looking statementsareprovidedasageneralguideonlyandshouldnotberelieduponasanindicationorguaranteeoffutureperformance.Actualresults,performanceorachievementsmaydiffermateriallyfromthoseexpressedorimpliedinsuch statementsandanyprojectionsandassumptiononwhichthesestatementsarebased.ThesestatementsmayassumethesuccessofBrightstarbusinessstrategies.Thesuccessofanyofthosestrategieswillberealisedintheperiodforwhich theforward-lookingstatementmayhavebeenpreparedorotherwise.Readersarecautionednottoplaceunduerelianceonforward-lookingstatements,particularlyinlightofthecurrenteconomicclimateandthesignificantvolatility,andexcept asrequiredbylaworregulation,noneofBrightstarortheirrespectiverepresentativesoradvisersassumesanyobligationtoupdatetheseforward-lookingstatements.Norepresentationorwarranty,expressorimplied,ismadeastothe accuracy,likelihoodofachievementorreasonablenessofanyforecasts,prospects,orstatementsinrelationtofuturematterscontainedinthisPresentation.Theforward-lookingstatementsarebasedoninformationavailabletoBrightstarasat thedateofthisPresentation.Exceptasrequiredbylaworregulation(includingtheASXListingRules),noneofBrightstarandtheirrespectiverepresentativesoradvisersundertakesanyobligationtoprovideanyadditionalorupdatedinformation whetherasaresultofachangeinexpectationsorassumptions,newinformation,futureevents,orresultsorotherwise.Indicationsof,andguidanceoroutlookonfuturefinancialpositionorperformancearealsoforward-lookingstatements. Aspirational Statements •ThestatementswhichmayappearinthisPresentationregardingtheaspirationsforBrightstartoundertakeconstructionofaSandstoneprocessingplantin2H’ Y27forfirstgoldproductionin2H’ Y28,aligningwithcontinuedplannedproduction growthfromBrightstar’sLavertonandMenzieshubstoaspirationallytargetGroupproductionprofileof+200kozp.a.by2029,areaspirationalstatements.ThesestatementsarenotproductiontargetsasBrightstardoesnotyethavesufficient objectivereasonablegroundstobelievethatthestatementscanbeachieved. •Importantly,thestatementsareconsideredaspirationalbecause,asdisclosedinitsASXannouncementdated30April2025titled‘ andstonegoldprojectacceleratingtowardsdevelopment’(April2025Announcement),Brightstarhasnotyet completedapre-feasibilitystudyforSandstone,notingthatSandstonehasalongoperatinghistorywithdetailedinformationavailableonhistoricalperformanceacrossthemajorityofdeposits,oremineralisationstylesandoperatingparameters (i.e.openpitminingandconventionalcarbon-in-leachprocessingconductedintherecentpast).Whilepreliminaryassessmentshavebeenundertaken,asdisclosedintheApril2025Announcement,substantialfurtherworkisrequiredbefore BrightstarwillbeinapositiontohavesufficientobjectivereasonablegroundstopublishproductiontargetsorforecastfinancialinformationrelatingtotheSandstoneProject. •Thestudywillneedtoconsideranumberofvariablesandfocusareaswhichareexpectedtoinclude,butarenotlimitedtoitemswithinthefollowingfeasibilitystudyworkstreams:preparingrobustupdateMineralResourceEstimatesforeach depositbasedongeologicalmodelsgeneratedbyexistingandnewgeologicalinformationinformedbyBrightstar’scurrentdrillingprograms;applyingcurrent(CY26)miningcostandoperationalparameterstodelineateeconomicmining optimisations,openpitminedesignsandschedulesthatencapsulatesgeotechnicalandmetallurgicalrecoveryinformationfromthirdpartytestwork;assessmentsintoapprovalsandpermittingprocesses,alongwithdetailedengineeringdesign work,optimalprocessingflowsheetsandrequisiteinfrastructurethatdeliversthebestoutcomeofrecoveredmetal,operatingcostsandcapitalcostswhichsupportstheseaspirations. •BrightstarconfirmsthattheinclusionofAspirationalStatementsinthispresentationarebasedentirelyontheAprilAnnouncementandcontainsnonewinformation. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 2
Important Notices & Disclaimers Not Investment Advice •EachrecipientofthePresentationshouldmakeitsownenquiriesandinvestigationsregardingallinformationinthisPresentationincludingbutnotlimitedtotheassumptions,uncertaintiesandcontingencieswhichmayaffectfutureoperationsof Brightstarandtheimpactthatdifferentfutureoutcomesmighthave.InformationinthisPresentationisnotintendedtoberelieduponasadvicetoinvestorsorpotentialinvestorsandhasbeenpreparedwithouttakingaccountofanyperson’s individualinvestmentobjectives,financialsituationorparticularneeds.Beforemakinganinvestmentdecision,prospectiveinvestorsshouldconsidertheappropriatenessoftheinformationhavingregardtotheirowninvestmentobjectives, financialsituationandneedsandseeklegal,accountingandtaxationadviceappropriatetotheirjurisdiction.Brightstararenotlicensedtoprovidefinancialproductadviceinrespectoftheirsecurities. Feasibility Study -Cautionary Statement Goldfields ProjectFeasibility Study •The production targets and forecast financial information disclosed in this presentation were first announced in accordance withA X isting ules 5.16 and 5.17 in the ompany’s announcement ‘ pdated Goldfields Feasibility tudy” dated 29 January 2026. •Unless otherwise stated, the Company confirms that all material assumptions underpinning the production targets and forecast financial information derived from the production targets in the original DFS release 1 continue to apply and have not materially changed. •The Company cautions that a portion of the production target (27%) is based on Inferred Mineral Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production targets themselves will be realised. Production Target •The Production Target (and forecast financial information derived from the Production Target) referred to in this announcement is underpinned by Measured and Indicated Mineral Resources of approximately 73% and Inferred Mineral Resources of approximately 27% over the DFS period. •The total Life of Mine Production Target includes 27% Inferred Resources, 3% Indicated Resource outside of Reserve and the remaining 70% is underpinned by Proven and Probable Ore Reserves. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the Production Target itself (or the forecast financial information) will be realised. Competent Persons Statements •The Mineral Resources and Ore Reserves estimates disclosed in this Presentation were first disclosed in accordance with ASX Listing Rules 5.8 and 5.9 in the announcements as cross-referenced. Brightstar confirms that it is not aware of any new information or data that materially affects the information included in the relevant announcement and that all material assumptions and technical parameters underpinning the estimates in the previous announcements continue to apply and have not materially changed. Currency •Unlessotherwisestated,alldollarvaluesinthisPresentationarereportedinAustraliandollars. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 3
INVESTMENT HIGHLIGHTS 4.5Moz -Gold developer executing on major production growth Two large-scale production centresto unlock Brightstar's TARGET200 strategy¹
- Refer to the Aspirational Statements disclaimer on page 2.
- Refer to Appendices 2-4 for Mineral Resource estimates and Ore Reserve statement.
- Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026.
- Assuming A$6,000/oz. Financial metrics are presented on a pre-tax basis -as at 31 December 2025, Brightstar had $209M of Group tax losses which are anticipated to be utilisedfor minimisingultimate tax expense.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
MAJOR PRODUCTION GROWTH ACROSS TWO WA PROJECTS²
•~4.5Moz Mineral Resources & 351koz Ore Reserves on granted Mining Leases
•Immediate production growth at Goldfields with Sandstone to deliver scale
•Targeting to be a TOP 10 AUSTRALIAN GOLD PRODUCER
01
COMPELLING NEAR-TERM GOLDFIELDS DEVELOPMENT³
•FUNDING PACKAGE: A$193M equity & US$120M debt funding package Q1 CY26
•6-year plan averaging 75koz p.a.
•New 1.5Mtpa CIL plant upgradeable to 2.5Mtpa
•First gold targeted June 2027
02
GOLDFIELDS HUB -MATERIAL FREE CASH FLOW³⁴
•Pre-tax NPV $606M | Pre-tax IRR 74% | Average FCF $163M p.a.
•LOM AISC $2,998/oz
•Cash generation from Goldfields to contribute to delivery of Sandstone 03 SANDSTONE -POTENTIAL TIER-1 WA DEVELOPMENT² •Targeted to deliver distinct scale, long-life production centre •Updated MRE of 2.9Moz @ 1.3g/t Au provides the platform for future growth •FINAL INVESTMENT DECISION TARGETED EARLY CY28 04 4
CORPORATE SNAPSHOT
Team & funding in place –platform for major production growth
BOARD OF DIRECTORS
Richard Crookes
Non-Executive Chairman
Alex Rovira
Managing Director
Andrew Rich
Executive Director -
Operations
Jonathan Downes
Non-Executive Director
RESEARCH COVERAGE
1.Refer to cash based as at June2026 per Quarterly Activities/Appendix 5B Cash Flow Report (30 July2026). Share price as at 31 July2026. Monthly liquidity based on last six trading months sourced from IRESS.
2.Includes gross Bond proceeds converted at 0.72 AUD/USD.
Please see Research notes available on Brightstar Website for Disclaimers and Disclosures.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
HNW/Retail
40%
Institutional
46%
S tr ategics &
M ining
Industry 12%
B o a r d/M a n a g e m e n t
2%
SHARE PRICE
$0.36
(AUD) As at 31 July 2026
REVENUE PROTECTION
60koz
Put options @ A$5,809/oz
MARKET CAP
$395M
1,098M shares on issue
ENTERPRISE VALUE
$273M
EV / Resource $61/oz
NET CASH
1
$122M
As per JunQ’26 quarterly
MINERAL RESOURCES
4.5Moz
99Mt at 1.4g/t Au
AVAILABLE, UNDRAWN DEBT
US$120M
Nordic Bond
AVG MONTHLY LIQUIDITY
~$80M
6-month average liquidity
SHARE PRICE PERFORMANCE
SHAREHOLDERS
5
5 10 15 20 25 30 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Feb-24Apr-24Jun-24Aug-24Oct-24Dec-24Feb-25Apr-25Jun-25Aug-25Oct-25Dec-25Feb-26Apr-26Jun-26 Volume (m shares) Share Price ($/share) VolumeClose Price
Leadership Experienced team in place to execute BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 6 B O A R D O F D I R E C T O R SM A N A G E M E N T T E A M Richard Crookes Geologist · Finance · 35+ yrs Non-Executive Chairman •Managing Partner, Lionhead Resources; ex-Investment Director, EMR Capital & ED, Macquarie Metals & Energy Capital •NE Chairman, Black Rock Mining (ASX:BKT); former Chief Geologist & Mining Manager, Ernest Henry Mining Alex Rovira Geologist · Finance · 14+ yrs Managing Director •MD of Brightstar since January 2023; BSc (Geology & Env. Science), BCom (IB & Corporate Finance) •14+ years' executive leadership & investment banking at Canaccord Genuity across ECM and M&A in metals & mining Andrew Rich Mining Engineer · 15+ yrs Executive Director –Operations •Leads Brightstar's operations; delivery of WA gold projects at Linden, Ramelius & Westgold •BEng (WASM) & WA First Class Mine Manager's Certificate; NED of Javelin Minerals (ASX:JAV) Jonathan Downes Geologist · 25+ yrs Non-Executive Director •Gold & base metals expertise spanning exploration through to production •Managing Director, Dundas Minerals (ASX:DUN); NED of Cazaly Resources (ASX:CAZ) Nicky Martin Finance · CPA · 20+ yrs Chief Financial Officer •7 years at Pilbara Minerals (ASX:PLS), latterly Head of Finance —through Pilgangoora financing, construction & ramp-up into the ASX50 •Deep experience across finance, accounting, offtake, hedging, tax & treasury Daniel Jolley Mechanical Engineer · 20+ yrs Project Director •Processing plant delivery expertise, most recently Northern Star / De Grey Mining's 10Mtpa Hemi Gold Project •Leading Laverton plant execution & Sandstone engineering; prior delivery roles with Mineral Resources & FMG Samuel Main Corporate Development · 12+ yrs Corporate Development Officer •Expertise in financing, capital markets, organic & inorganic growth and investor relations •12+ years' experience across capital markets and M&A Jonathan Gough Geologist · 15+ yrs General Manager –Geology •Proven WA gold geology executive across production, resource definition & exploration •Ex-Exploration Manager, Musgrave Minerals —pivotal to the Cue Gold Project prior to the Ramelius takeover Katherine Hughes Human Resources · 15+ yrs Chief Human Resources Officer •Strategic HR, industrial relations & transformation across mining, manufacturing and transport •Leads people strategy, culture & leadership capability supporting Brightstar's growth Brendan Bow Environment & Approvals · 20+ yrs Environment & Approvals Manager •WA mining environmental, approvals, heritage & land access professional •Leading approvals, permitting & compliance across the Goldfields & Sandstone developments Julie Budrey Health & Safety · 25+ yrs Group Health & Safety Manager •Proven record building safety performance & workforce culture across WA mining operations •Ex-Group HSET Manager, Emeco Holdings; ex-Group OHS Manager, Westgold Resources
Goldfields Project Executing on pathway to +75koz p.a. –First gold June 2027
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 8 1.5Mtpa Laverton Plant Goldfields Construction Underway
GR Engineering appointed to construct 1.5Mtpa Laverton Plant 1 Fixed-price EPC contract de-risks the construction phase, with embedded capacity to cost-effectively expand to 2.5Mtpa during operations ▸Conventional 1.5Mtpa CIL processing plant with embedded engineering design for expansion to 2.5Mtpa during operations ▸Lump-sum, fixed-price EPC delivery model selected for construction of new processing infrastructure ▸Long lead-time orders awarded to de-risk development schedule ▸Preferred gas-fired power pathway delivers de-risked energy source ▸LOM average processing cost of A$31/t processed 2 ▸Plant design based on consolidated metallurgical parameters across all mine sites -delivering LOM average recoveries of 91% 2 ▸FID declared and construction activities commenced in JunQ’26 INITIAL CAPACITY 1.5Mtpa Delivering 75koz p.a. EXPANSION UPSIDE 2.5Mtpa Pre-engineered for upside optionality LOM RECOVERY 91% Recovering 457koz Au over 6 yr LOM 1.Refer ASX announcement “GR Engineering appointed as Preferred Contractor –Laverton Processing Plant’ dated 17 February 2026. 2.Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Laverton Processing Plant –1.5Mtpa design render GOLDFIELDS PROJECT LOM UNIT COST $31/t Per tonneprocessed 9
GOLDFIELDS PROJECT
De-risked development pathway -stagedopen-pit & underground mining
New 1.5Mtpa processing plant unlocks existing 1.6Moz @ 1.6g/t Au Mineral Resource on granted mining leases
02
THREE OPEN PITS UNDERPIN LIFE-OF-MINE PRODUCTION
~1Moz @ 1.4g/t Au in three open pits
▸+70% of total Goldfields Project gold production delivered from three open pits mines
▸Each pit carries a 2–3 year mine life with extension upside
▸Mining commences at Lord Byron in late CY26
▸Lord Byron is co-located with Fish, where camp and support infrastructure is already in place
GOLDFIELDS HUB REGIONAL MAP
1.Refer ASX announcement ‘EPC Contractor Engaged for Goldfields Project’ dated 17/02/2026
2.Refer ASX announcement ‘Strategic Drill & Blast Agreement executed with Aquirian’ dated 16/04/2026
3.Refer to Appendices 2-4 for Mineral Resource estimates and Ore Reserve statement.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
01
SIMPLIFIED BUSINESS MODEL
Staged open pit and underground operations
▸Operating model:One open pit providing base-load, one underground mine delivering high-grade
▸Brightstar-owned processing infrastructure–captures full portfolio value through a hub-and-spoke
operating model
▸5+ years of owner-operator mining experience underpins a step change in gold production
03
DEVELOPMENT ACTIVITIES RAMPING UP
Processing plant site established and construction underway
▸170-person Lord Byron-Fish camp already in operation
▸ALLmine sources have previously been mined and processed –well understood operationally
▸GR Engineering appointed to mill construction
2
; drill & blast contract with AquirianLtd executed
3
▸Mill construction underway -first gold targeted in JunQ’27
10
Calendar Year20262027 QuarterMarQJunQSepQDecQMarQJunQSepQDecQ Studies & Funding Goldfields DFS 2.0 Funding Execution Final Investment Decision (FID) Approvals MDCP Plant Approval Works Approval Construction 170-person Camp upgrades 1.5Mtpa Processing Plant EPC Contract Power, Water & Site NPI Potential 2.5Mtpa Expansion Construction Mining Lord Byron Site Establishment Lord Byron Open Pit Mining Operations Fish Underground Mining Operations Yunndaga Underground Site Establishment Yunndaga Underground Mining Operations JULY 2026 FIRST GOLD –JUNE 2027 BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer GOLDFIELDS PROJECT Gold pouring in less than 12 months First Gold targeted in June 2027 11
PRE-TAX NPV₈
$606M
A$6,000/oz
PRE-TAX IRR
74%
NPV/Capex ratio 3.2x
LOM FREE CASH FLOW
~$1.0B
Over 6 years, undiscounted
AVERAGE ANNUAL FCF
$163M
Steady-state operations per annum
LOM GOLD PRODUCED
457koz
Over 6 years
AVERAGE PRODUCTION
2
~75koz p.a.
1.5Mtpa Processing Plant in Laverton
GROUP AISC
3
$2,998/oz
C1 cash cost $2,581/oz
PEAK FUNDING REQ.
3
$188M
Payback ~15 months
4
SENSITIVITY TO GOLD PRICE -A$/oz
METRIC (A$M)$5,500/oz$6,000/oz$6,500/oz$7,000/oz$7,500/oz
Pre-tax NPV₈($M)
5
4546067589111,063
Pre-tax IRR (%)
5
587490106121
Annual FCF ($M)126163200236273
LOM FCF ($M)7589771,1971,4171,637
1.Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026.
2.1.5Mtpa design capacity based on 100% fresh rock throughput; plant design has embedded optionality for expansion to 2.5Mtpa.
3.C1 cash cost includes mining opex, haulage, processing and G&A costs. AISC = C1 cash costs plus sustaining capital + royalties -both based on gold ounces produced at A$6,000/oz.
4.Payback period calculated from the first month of gold production after mill commissioning.
5.Pre-tax basis -as at 31 December 2025, Brightstar had $209M of Group tax losses available.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
GOLDFIELDS PROJECT
DFS2.0economics demonstrates a robust development case
1
A high-margin, short-payback development with demonstrable mine life extension opportunities
12
Sandstone Gold Project Growing the size of the opportunity -a district-scale Tier-1 development in the making
- Refer to Appendix 3 for Sandstone Mineral Resource estimates. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer SANDSTONE GOLD PROJECT ¹ 2.9Moz @ 1.3g/t Au ▸Platform set for a significant, stand-alone WA gold development ▸Total footprint of~1,800km 2 of highly-endowed WA Greenstone Belt terrane ▸Mineral Resources located on granted Mining leases ▸PFS underway -evaluating large-scale central processing plant utilising existing plant site and infrastructure to fast-track approvals ▸July 2026 Interim MRE Update: 69Mt @ 1.3g/t Au for 2.9Moz Au ▸18% growth in total Sandstone MRE ▸+113% growth in Measured & Indicated classification (1.1Moz @ 1.5g/t Au) ▸~145,000m drilled under BTR ownership ▸Additional Mineral Resource update due DecQ’26 ▸Material exploration upside-Shallow Mineral Resource with limited historical systematic exploration history prior to Brightstar ▸No mining since 2010 (gold price was ~A$1,000/oz) and previous owners focus on oxide mineralisation due to processing limitations delivers logical in/near-deposit growth targets SANDSTONE PROJECT 2.9Moz Mineral Resource base –Underexplored and positioned for development Emerging district-scale WA gold development opportunity 14
Delivering a district-scale opportunity 01 Improve Resource Quality & Grow oTarget further upgrades to existing MRE of 2.9Moz @ 1.3g/t Au -DecQ’26 oTransition from >100km of infill drilling to extensional & greenfield targets 02 Convert Resources to Reserves oComprehensive technical work underpins a maiden Ore Reserve in PFS oTargeting a long-life asset with a material production profile necessitates a meaningful Ore Reserve 03 Right-Size Processing Infrastructure oA large-scale processing plant creates the foundation for a district-scale, long-life production centre-unlocking ~1,800km² of prospective Greenstone Belt terrane 1.Refer to ASX announcement ‘Sandstone gold project accelerating towards development’ dated 30 April 2025 and ‘Strategic Plan to Unlock Sandstone” dated 27 January 2026. TWO-YEAR SANDSTONE STRATEGIC PLAN BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Alignment to Strategic Plan 1 •Long-Term Growth 1 : Multi-million-ounce MRE growth to support long-life operations. •PFS: Targeting 1 maiden re eserve 2H’ Y26 that underpins a material WA gold development •DFS: Targeting 1 material uplift to PFS Ore Reserve from increased exploration spend and on-going mine optimisationwork. •Target: Apply Goldfields free cash flow & refinance debt to fund Sandstone into production 15 Calendar Year202620272028 Drilling Infill Drilling Growth & Greenfields Studies Geotechnical Testwork Metallurgical Testwork Processing Plant Pre Feasibility Study (PFS) Permitting & Approvals Definitive Feasibility Study (DFS) Execution Funding Final Investment Decision (FID) MRE Upgrade Pre-Feasibility Study Commence construction Sandstone Strategic Plan -Execution Roadmap MRE Upgrade Definitive Feasibility Study Final Investment Decision JULY 2026 MRE Upgrade
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Central Sandstone –Critical Mass for development pathway Existing Mineral Resource of 2.9Moz Au provides critical mass for PFS evaluation and future development CENTRAL SANDSTONE Critical mass from existing Mineral Resources underpins future development ▸Existing MRE of 2.9Moz @ 1.3g/t Au provides the platform for feasibility studies, permitting/approvals and progress towards development oSufficient scale: No more M&A or exploration success required for pathway to Sandstone development ▸Brightstar exploration strategy to date has focused on improving the quality of the Mineral Resource to de-risk future development oMaterial infill drilling programs enabled robust and conservative re-estimation of Mineral Resources. o1.1Moz @ 1.5g/t Au in Measured & Indicated classification oTotal Sandstone MRE increased to 2.9Moz Au (18% growth) GROWTH OUTCOME EXCEEDED EXPECTATIONS ▸Final PFS-infill programs focused on further keyexistingdeposits for growth: oBull Oak + Indomitable Camp + TMH-Shillington oThese three deposits host +1Moz in Inferred Resources –targeted for further material conversion into M&Ifor inclusion in the PFS ▸Exploration focus transitioning to growth as PFS workstreams advance SANDSTONE PROJECT 16
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Central Sandstone Growth Potential
Early-stage growth targets present opportunity for multi-million-ounce Mineral Resource growth potential and a unique development proposition in the region
CENTRAL SANDSTONE
Growth targets provide platform for ‘Tier 1 status’
▸Significant exploration potential for new discoveries and MRE growth
▸Brightstar’s exploration focus to transition to answering the question:
“How Big Could Sandstone Be?”
▸Pipeline of early stage greenfields opportunities provides ‘competition for capital’
within Brightstar with multiple compelling exploration targets across the group
▸Systematic testing and advancing these greenfields opportunities towards
maiden Mineral Resources and possible inclusion in future development studies
▸Brightstar has executed a deliberate focus on improving geological confidence and
resource classification rather than MRE growth to date.
▸In parallel with ongoing feasibility studies, the exploration strategy now enables
a sustained focus on growth opportunities to illustrate the scale of the
Sandstone gold camp
SANDSTONE PROJECT
17
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Montague –Shallow deposits provide potential for open pit developments High-grade mineralisation targeted for open pit mining and haulage to Sandstone processing MONTAGUE Limited exploration history provides the upside ▸New MRE of 664koz @ 1.3g/t Au ▸~70km from Sandstone by a well-established haul-road ▸Indicative haulage cost of A$15/t (or ~0.1g/t Au equivalent) to proposed Sandstone mill 1 ▸Higher grades indicates likely early inclusion in Sandstone mine schedule ▸Previous exploration history has been focused on the main deposits around the Montague Granodiorite ▸Compelling opportunities for growth to existing deposits and potential for new discoveries SANDSTONE PROJECT 18 1.Utilising a haulage cost of $0.21/tonne/km.
Brightstar's Market Position An unparalleled gold development opportunity at the junior end of the ASX -well placed to re-rate as a producer
TARGETING AN ASX MID-TIER GOLD PRODUCTION SCALE Limited mid-tier producers with scale of >200koz p.a. 22 24 77 96 100 104 124 144 155 168 192 285 329 337 373 379 050100150200250300350400 Annualised Production (kozp.a.)¹ TARGET200 puts BTR into Mid-Tier scale ▸Few other junior companies have a project pipeline that rivals Brightstar ▸Execution of TARGET200 strategy positions BTR alongside established mid-tier producers and could establish Brightstar as a TOP 10 AUSTRALIAN PRODUCER ▸De-risked re-rate opportunity maturing as major production growth strategy is delivered ▸Consistent recent theme of potential large-scale production and growth being acquired (De Grey Mining, Spartan Resources)
- Refer to Appendix 7 for references. Based on June 2026 Quarterly production run-rates and FY26 actual production from published company disclosures –small variancesmay occur dur to rounding. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer MID-TIER OPPORTUNITY 1,543 715 Kaiser Reef Meeka Pantoro Black Cat Emerald Catalyst Capricorn Bellevue Ora Banda Alkane Ramelius Genesis Vault Westgold Regis Evolution Northern Star Greatland M&A has diminished the pipeline of emerging producers with +200koz p.a. production potential 20
DEMONSTRABLE VALUE-ADDING APPROACH IN GROWING MINERAL RESOURCES & ADVANCING ASSETS TO PRODUCTION A robust position to build a WA gold mining mid tier
- Refer to Appendix 8 for references. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 21 AZY: Minyari Dome BC8: Kal East/Coyote/Paulsens AUC: Katanning HRN: Gum Creek MRT: Kalgoorlie BTR: Goldfields/Sandstone MI6: Bullabulling STN: Apollo Hill AAR: Mandilla GG8: Nth Kalgoorlie / Vivien 1.5 2.5 3.5 4.5 5.5 6.5 0.00.51.01.52.02.53.03.54.0 Resource (Moz) Grade (g/t Au) ASX WA Gold Developers —Resource vs Grade (Bubble = Relative EV, A$M) 0.2Moz 0.5Moz 0.6Moz 1.0Moz 1.9Moz 0.3Moz 0.5Moz 0.9Moz 2.0Moz 2.6Moz 0.5Moz 1.0Moz 1.5Moz 3.0Moz 4.5Moz Jun-22Jun-23Jun-24Jun-25Jul-26 Brightstar's Global MRE Growth (Year-on-Year) M&IInferred A successful track record in M&A combined with aggressive exploration has placed Brightstar at the top end of the advanced developers and emerging producers with genuine multi-asset production scale potential
DEVELOPMENT & PRODUCTION COMPARABLE PEERS¹
Undemanding valuation on every resource and reserve metric
Goldfields &
Sandstone
Kalgoorlie &
Paulsens
Murchison
NorsemanDavyhurstPlutonicBullabullingKatanning
CORPORATE
2
Market Cap ($M)395620272
7742,0241,4371,340466
Enterprise Value ($M)273546234
5711,7561,2061,243378
Net Cash ($M)1227438
2032682319687
MINERAL RESOURCES
Resource (koz)4,4572,5241,235
4,6013,6903,4536,2002,443
Grade (g/t)1.43.03.0
3.32.03.11.01.1
Measured (koz)525755
37499--1,531
Indicated (koz)1,8731,269645
1,8981,7262,6924,400693
Inferred (koz)2,5321,199535
2,3271,8707591,700219
ORE RESERVES & STUDY
Mine TypeO/P & U/G³O/P & U/GO/P & U/G
O/P & U/GO/P & U/GO/P & U/GO/PO/P
Reserve (koz)351³330305
8596108612,5001,330
Grade (g/t)1.6³2.43.8
2.12.32.90.91.1
Plant Size (Mtpa)1.5³1.20.6
1.21.21.253.6
Production (koz/yr)75³9624
77155104--
VALUATION
EV/Production ($/oz)-6,40211,431
6,97812,36712,638--
EV/Resource ($/oz)61216189
124476349201155
EV/Reserve oz ($/oz)-1,654766
6642,8791,401497284
1.Refer to Appendices 6 for references.
2.As at31July 2026 -sourced from S&P CapIQ.
3.Goldfields DFS 2.0 only.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Black Cat
Meeka Metals
PantoroGoldOra BandaCatalyst MetalsMinerals 260Ausgold
EMERGING PRODUCER PEERS
ESTABLISHED PRODUCER PEERS
EXPLORER / DEVELOPER PEERS
Brightstar
Resources
Limited
22
SUMMARY Platform set for sustained growth Advancing a multi-hub production growth -Tier-1 jurisdiction, +4.5Moz Au on granted Mining Licenses BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 01 GOLDFIELDS DEVELOPMENT ▸Simplified business model: 1x open pit & 1x underground + BTR-owned infrastructure ▸First gold targeted JunQ’27 ▸LOM Free Cash Flow $1.0B 1 over 6 years 02 SANDSTONE TO DELIVER SCALE ▸Multiple MRE upgrades due CY26 ▸PFS due late CY26 ▸DFS and FID due late CY27 / early CY28 ▸Targeting long-life, low cost “ ier 1 status” project 03 EXPERIENCED TEAM ▸Deep WA gold mine-building & operating experience ▸Proven project execution capability leveraging +5 years of owner-operate inhouse capability ▸GR Engineering appointed to construct Laverton plant 04 DRILL, DRILL, DRILL ▸+100,000m drilling programs planned CY26 –drilling transitions from infill to GROWTH ▸Exploration to target Resource growth and quality ▸4-6 rig drilling throughout CY26 05 CAPTURING VALUE ▸Undemanding Reserve / Production comparable metrics ▸Significant potential to re-rate as multi-mine developer line with producer peers ▸EV/Resource ~$61/oz vs peer median >$300/oz 06 COMMUNITY ENGAGEMENT ▸Strong Native Title, local Shires, pastoralist relationships ▸Advanced Native Title Agreement negotiations ▸ESG strategy aligned with responsible gold production 23
Appendices Montague Open Pit (Sandstone)
5
75
78
79
77
76
67
0
20
40
60
80
FY27FY28FY29FY30FY31FY32FY33
Gold (koz)
Group Production (koz)
1.Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026.
2.Diluted mined grade.
3.Gross revenue less royalties. Some variances may occur due to rounding.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Goldfields DFS 2.0UnitLavertonMenziesTotal
Key Production Outcomes²
Open Pit Mining
Orekt4,8933,0147,906
Grade²g/t Au1.41.61.5
Contained ounceskoz226150377
Operating Strip ratiow:o9.211.710.2
Underground Mining
Orekt8786351,513
Grade²g/t Au2.72.62.6
Contained ounceskoz7652128
Consolidated Operations
Orekt5,7713,6499,419
Grade²g/t Au1.61.71.7
Contained ounceskoz302203505
M&I contribution%69%80%73%
Processing
Ore processedkt9,4199,419
Feed grade²g/t Au1.71.7
Contained ounceskoz505505
Recovery%91%91%
Ounces producedkoz457457
$977m
AVERAGE GOLDFIELDS DFS 2.0 PRODUCTION
+75 koz p.a.
1.5Mtpa Laverton Plant
GOLDFIELDS PROJECT
+75koz p.a. from a consolidated Laverton processing strategy
1
Yielding ~$1.0B of pre-tax free cash flow² at A$6,000/oz over a six-year mine life
3
(400)
(200)
200 400 600 800 1,000 FY26FY27FY28FY29FY30FY31FY32FY33 Cash flow ( A$m ) Pre-tax Project FCF –(A$6,000/oz) Mining capexMining opexNet revenueCum. Free cash flow (pre-tax) 25
LAST 12 MONTHS
Transformative year sets platform for growth
JAN 2025 –MAR 2026
Laverton Production
▪384kt @ 2.2g/t Au for 24koz recovered via
OPA with Genesis Minerals
▪Generated over $95M of net proceeds
(after processing charges) to BTR reinvested
across portfolio
▪Maintained BTR’s owner-operator DNA in
readiness for broader Goldfields
development and production
1.Refer to Brightstar Resources ASX announcements, May 2025 -May 2026.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
26
DEC 2025
Sandstone Consolidation Complete
▪Completion of Aurumin acquisition completing
B ’s consolidation of the andstone region
▪Consolidated Mineral Resource Estimate of
2.4Moz @ 1.5g/t
▪Announced the two-year Sandstone
Strategic Planwhich plans to capture full
value from potential Tier 1 asset
JAN 2026
Goldfields DFS 2.0
▪Compelling economics: A$606m NPV
8
74% IRRA$1.0bn LOM FCF @ A$6,000/oz
▪New 1.5Mtpa CIL plant to be built south of
Laverton
▪First gold targeted JunQCY27
FEB –MAR 2026
Funding Package for Development
▪Strategic equity raise: A$193m via placement and
oversubscribed SPP
▪Debt funding secured: US$120m Bond
▪Sandstone funded to FID: Parallel advancement of
growth drilling and PFS/DFS
MAY 2026 +
Goldfields Execution
▪Early works underway including initial site
works and processing plant long lead orders
▪Key development partners appointed with
GR Engineering processing plant EPC
▪FID declared in May 2026 with
construction underway
LAVERTON MINE
Lord Byron Open Pit
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Oblique view of the Lord Byron open
pit design with Mineral Resource
block model (coloured by grade)
Recent exploration at Lord Byron
(looking NW) with existing Lord Byron
open pits in the background
LORD BYRON OPEN PIT
JORC Mineral Resource of 5.4Mt @ 1.5g/t Au for 267koz Au
1
Fully approved for mining operations to commence
Two small historic open pits coalesce into one, large open pit mine
2.5 year mine lifebased on current open pit mining inventory
Mining to commence DecQ’26
Processing physicals and costs
2
:
•Mining 2.5Mt @ 1.4g/t Au for 112koz Au mined
•92koz Au recovered(82% recovery)
•Average operating strip ratio of 8:1
•C1 Cash Cost: $2,491/oz
•AISC Cost: $2,878/oz
3
Ore Reserves: 1.8Mt @ 1.4g/t Au for 83koz
4
ocated ~50km from Brightstar’s processing facility along established haul
routes
Open down dip and along strike to the South –near term drilling focused on
shallow mine life extensions to the South
Targeting commencement of mining operations and stockpiling from DecQ’26
in advance of Brightstar’s processing plant commissioning
1.Refer to Appendix 2 for Goldfields Mineral Resources.
2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026.
3.Assumes A$6,000/oz.
4.Refer to Appendix 4 for Ore Reserve statement.
27
LAVERTON MINE Cork Tree Well Open Pit BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer CORK TREE WELL OPEN PIT JORC Mineral Resource of 6.5Mt @ 1.4g/t Au for 292koz Au 1 Mining to commence 2030 2.5 year mine lifebased on current open pit design Processing physicals and costs 2 : •Mining 2.4Mt @ 1.5g/t Au for 114koz Au mined •108koz Au recovered (95% recovery) •Average operating strip ratio of 10:1 •C1 Cash Cost: $2,411/oz •AISC Cost: $2,813/oz 3 Ore Reserves: 2.1Mt @ 1.5g/t Au for 104koz 4 Open at depth and along strike -significant exploration upside to grow Resources on underexplored tenure ocated ~75km from Brightstar’s processing facility along established haul routes Oblique view of the Cork Tree Well open pit designs with Mineral Resource block model (coloured by grade) Aerial view of historic CTW open pits (looking south) 1.Refer to Appendix 2 for Goldfields Mineral Resources. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Assumes A$6,000/oz. 4.Refer to Appendix 4 for Ore Reserve statement. 28
MENZIES MINE Lady Shenton Open Pit BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LADY SHENTON OPEN PIT JORC Mineral Resource of 8.1Mt @ 1.4g/t Au for 352koz Au 1 Fully approved for mining operations to commence Mining to commence 2H’CY28 ~3 year mine lifebased on current open pit mining inventory On-going exploration to assess potential for underground operations following open pit mining Processing physicals and costs 2 : •Mining 2.7Mt @ 1.5g/t Au for 132koz Au mined •121koz Au recovered(91% recovery) •Average operating strip ratio of 11:1 •C1 Cash Cost: $2,959/oz •AISC Cost: $3,516/oz 3 Ore Reserves: 2.4Mt @ 1.5g/t Au for 117koz 4 Open at depth and along strike -significant exploration upside to grow Mineral Resources on underexplored tenure 1.Refer to Appendix 2 for Goldfields Mineral Resources. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Assumes A$6,000/oz. 4.Refer to Appendix 4 for Ore Reserve statement. Oblique view of the Lady Shenton open pit designs with Mineral Resource block model (coloured by grade) Aerial view into the historic Lady Shenton open pit (looking south) 29
MENZIES MINE YunndagaUnderground BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer YUNNDAGA UNDERGROUND et to be Brightstar’s next underground mine JORC Mineral Resource of 3.1Mt @ 2.1g/t Au for 206koz Au 1 (inclusive of lower grade halo) Mining to commence SepQ’27 Significant advantage utilising existing underground equipment, infrastructure and personnel from current underground operations 2 year mine lifebased on current underground mining plan Processing physicals and costs 2 : •Mining 0.6Mt @ 2.6g/t Au for 52koz mined •50koz Au recovered(~92% recovery) •C1 Cash Cost: $3,291/oz •AISC Cost: $3,441/oz 3 Ore Reserves: 0.5Mt @ 2.7 g/t Au for 47koz 4 Open at depth with significant scope for Mineral Resource growth and mine life extension Standard WA underground open stope, retreat mining methodology utilising conventional underground mining equipment Oblique view of the Yunndaga underground mine design with Mineral Resource block model (coloured by grade) Aerial view into the historic Yunndaga open pit (looking north) 1.Refer to Appendix 2 for Goldfields Mineral Resources. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Assumes A$6,000/oz. 4.Refer to Appendix 4 for Ore Reserve statement. 30
Comparable transactions for Western Australian pre-production gold assets -acquisition cost, A$/ounce BTR TransactionNon-BTR Transaction BTR M&A Weighted Average¹: A$45/oz Non-BTR M&A Average: A$179/oz Note 1: Weighted average based on all BTR M&A transactions. Refer to Appendix 5 for details on transaction multiples. MineralResource estimates presented above are standalone target Mineral Resources (not proforma). 29 / 35 BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer APPENDIX Appendix 1: Brightstar’s Impressive M&A Track Record 867664642568 253 219 207 204 176 160 125 93 88 80 7373 71 68 66 64 62 56 48 42 41 31 24 16 0 200 400 Feb-25Mar-25May-25Feb-20Feb-26Jun-21Dec-24Jul-23Jun-23May-25Nov-20Feb-25Dec-23Jul-25Jan-25Apr-24Dec-25Mar-24Jan-23May-25Jul-25May-20Dec-21Aug-24Mar-23Mar-23Aug-24Dec-22 EV / Resource ounce (A$/oz) Target Acquiror Enterprise Value (A$M) Mineral Resource (koz) Feb-25Mar-25May-25Feb-20Feb-26Jun-21Dec-24Jul-23Jun-23May-25Nov-20Feb-25Dec-23Jul-25Jan-25Apr-24Dec-25Mar-24Jan-23May-25Jul-25May-20Dec-21Aug-24Mar-23Mar-23Aug-24Dec-22 Matsa Resources Spartan Resources Gold Road Spectrum Metals Magnetic Resources Firefly Resources De Grey Mining Musgrave Minerals Strickland Minerals Old Highway Project NTM Gold Maximus Resources Kin Mining Warriedar Resources Bulla- bulling Project Hobbes Project Mt Henry- Selene Gold Linden Gold Vango Mining Laverton (Focus) Project Aurumin Alt Resources Bardoc Gold Alto Metals Lady Ida Project Breaker Resources Montague East Project Kingwest Resources AngloGold Ramelius Resources Gold Fields Ramelius Resources Genesis Minerals Gascoyne Resources Northern Star Ramelius Resources Northern Star Catalyst Metals Dacian Gold Astral Resources Genesis Minerals Capricorn Metals Minerals 260 Northern Star Alicanto Minerals Brightstar Resources Catalyst Metals Genesis Minerals Brightstar Resources AurenneSt Barbara Brightstar Resources Beacon Minerals Ramelius Resources Brightstar Resources Brightstar Resources 8122,0942,600202606432,8151896133853154164167136524662505932146441353128 9363,1524,0503562,40019613,5849273462066793356102,0502,3001779153511,0023,9009515713,0731,0463181,684507505 31
Appendix 2: Goldfields Mineral Resources BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LAVERTONCut-offMeasuredIndicatedInferredTotal g/t Auktg/t Aukozktg/t Aukozktg/t Aukozktg/t Aukoz Alpha0.5---3711.9221,0282.8921,3992.5115 Beta0.53451.7195761.6299611.7541,8821.7102 Cork Tree Well0.5---3,2641.61663,1981.21266,4621.4292 Lord Byron0.53111.7172,1041.51052,9741.51455,3891.5267 Fish1.6255.441994.5291533.2163764.049 Gilt Key0.5---152.211531.361681.38 Second Fortune (UG)2.52415.3123413.7153411.7139213.440 Total –Laverton7052.3526,5631.73678,5011.745215,7681.7873 MENZIESCut-offMeasuredIndicatedInferredTotal g/t Auktg/t Aukozktg/t Aukozktg/t Aukozktg/t Aukoz Lady Shenton System0.5/1.2---3,7251.41684,3491.31848,0741.4352 Yunndaga0.5/1.2---2,1722.21529231.8543,0952.1206 Aspacia0.5---1371.771,2381.6621,3751.670 Lady Harriet System0.5---5201.3225901.1211,1101.2243 Link Zone0.5---1601.377401.0238901.09 Selkirk0.5---306.361401.251702.112 Lady Irene0.5------1001.761001.76 Total –Menzies---6,7441.73628,0801.435514,8141.5718 This Presentation contains references to Brightstar’s JORC Mineral Resources, extracted from the ASX announcements titled “Maiden Link Zone Mineral Resource Estimate –Amended” dated 15 November 2023, “Cork Tree Mineral Resource Upgrade Delivers 1Moz GroupMRE” dated 23 June 2023 and “Auralia Review” dated 10 September 2020, and ASX announcements for KingwestResources Limited titled, "High grade drilling results and high grade resource estimation from the Menzies Goldfield” dated 13 December 2022, "Menzies JORC gold resources surpass 500,000 ounces" dated 26 April 2022, “Robust Mineral Resource upgrades at Laverton and Menzies ahead of DFS delivery underpins future mining operations” dated 19 May 2025, “Menzies Mineral Resources Increases 22% to 0.7Moz” dated 11 December 2025 and “Drilling results and Mineral Resource upgrade at Lord Byron” dated 1 January 2026. This Presentation contains references to Linden’s JORC (2012) Mineral Resources, as reported in the announcement released by Brightstar on 25 March 2024 titled “Brightstar makes Recommended Takeover Offer for Linden Gold Alliance Limited”. APPENDIX 32
Appendix 3: Sandstone Mineral Resources BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LocationCut-offMeasuredIndicatedInferredTotal g/t Auktg/t Aukozktg/t Aukozktg/t Aukozktg/t AuKoz Montague-Evermore0.4---1,6832.11143,1221.31274,8051.6241 Whistler0.4---1,2582.0795651.4251,8231.8105 Achilles / Airport0.4---2,1301.3904,2551.01346,3851.1224 Duplex0.4------1,0030.9301,0030.930 Julias (Attributable)0.4---1,2581.2495560.8151,8141.164 Lord Nelson0.4---4,4411.52151,7581.1646,1991.4279 Lord Henry0.4---1,5231.6768831.4402,4061.5116 Vanguard Camp0.4---1,6162.21152,1941.3903,8091.7205 Havilah Camp0.4------1,3591.2541,3591.254 Indomitable Camp0.4---2,0991.2818,7721.028410,8711.0366 Bull Oak0.4/0.8---1,4810.9449,0561.027810,5371.0322 Two Mile Hill / Shillington0.4/0.73---4,6731.31909,9011.754114,5741.6731 McIntyre0.4---5131.220770.925891.223 Plum Pudding0.4---4981.017520.915501.018 Central Trend (Eureka, Wirraminna, Old Town, Twin Shafts, Goat Farm, McClaren) 0.5---1,4801.1531,1311.1392,6121.191 Total ---24,6521.51,14444,6841.21,72569,3371.32,868 This Presentation contains references to Brightstar’s JORC Mineral Resources, extracted from the ASX announcements titled “Brightstar to drive consolidation of Sandstone Gold District” dated 1 August 2024, “Scheme Booklet Registered by ASIC” dated14October 2024, “Brightstar Pursues Synergistic Consolidation at Sandstone” dated 21 July 2025 , “Scheme Booklet Registered by ASIC” dated 9 October 2025 and “Sandstone MineralResource Grows to 2.9Moz” dated 15 July 2026. APPENDIX 33
Appendix 4: Ore Reserves BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LocationProvedProbableTotal Goldfields Ore Reserves 1 ktg/t Aukozktg/t Aukozktg/t Aukoz Cork Tree Well Open Pit (Laverton)---2,1371.51042,1371.5104 Lord Byron Open Pit (Laverton)3081.6151,5301.4681,8381.483 Lady Shenton Open Pit (Menzies)---2,3951.51172,3951.5117 Yunndaga Underground (Menzies)---5392.7475392.747 Total3081.6156,6011.63356,9091.6351 The references in this presentation to Brightstar’s Ore Reserve estimates were reported in accordance with Listing Rule 5.9 in the following announcements: (a): “Maiden Underground Ore Reserves Underpins FY26 Production” dated 26 June 2025, (b)“Menzies andLaverton Gold Project Feasibility Study” dated 30 June 2025 and (c) “Updated Goldfields Feasibility Study” dated 29 January 2026”, Brightstar confirms that the material assumptions and technical parameters disclosed in the announcement continue to apply and have not materially changed. Brightstar confirms that it is not aware of any new information or data that materially affects the information included in the previous market announcements and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. APPENDIX 34
Appendix 5: Comparable Transaction Data BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer AcquirorTargetProject StageAnn. Date Enterprise Value¹ Mineral Resource Resource Multiple Source Information A$mkoz Au.A$/oz Au.DateASX Release Title RameliusResourcesSpartan ResourcesResource DevelopmentMar-252,0943,15266417-Mar-25 Transformation Combination of Ramelius& Spartan RameliusResourcesSpectrum MetalsResource DevelopmentFeb-2020235656910-Feb-20 Ramelius Makes Recommended Takeover Offer for Spectrum Metals Gascoyne ResourcesFirefly ResourcesResource DevelopmentNov-214319621816-Jun-21 Merger of Gascoyne Resources and Firefly Resources Northern StarDe Grey MiningDFSDec-242,81513,5842072-Dec-24 Northern Star agrees to acquire De Grey Ramelius ResourcesMusgrave MineralsPre-Feasibility StudyJul-231899272043-Jul-23 Recommended Takeover Offer for Musgrave Minerals Ltd Northern StarStrickland MineralsResource DevelopmentJun-236134617626-Jun-23 Sale of Millrose Project for $61m to Northern Star Resources Catalyst MetalsOld Highway ProjectResource DevelopmentMay-25332061588-May-25 Catalyst acquires Old Highway gold deposit Dacian GoldNTM GoldResource DevelopmentNov-208567915216-Nov-20 Strategic Merger of Dacian Gold and NTM Gold Astral ResourcesMaximus ResourcesResource DevelopmentFeb-2531335923-Feb-25 Astral Resources and Maximus Resources to Merge via Recommended Takeover Offer Genesis MineralsKin MiningResource DevelopmentDec-23546108814-Dec-23 Reporting on select Kin Mining gold projects 14/1/23 AngloGoldMatsa ResourcesFeasibility StudyFeb-258129368727-Feb-25 Matsaand AngloGold Ashanti Execute A$101 Million Deal Lake Carey Gold Project Minerals 260Bullabulling ProjectResource DevelopmentJan-251672,3007214-Jan-25 Transformational acquisition of the 2.3Moz BullabullingGold Project in WA, one of Australia's largest undeveloped gold projects Northern StarHobbes ProjectResource DevelopmentApr-2413177719-Apr-24 Sale of Hobbes Exploration Licence for $1.5M Brightstar ResourcesAuruminResource DevelopmentJul-25599516218-Jul-25 Strategic Acquisition of Aurumin Consolidates Sandstone Brightstar ResourcesLinden GoldResource DevelopmentMar-24243516825-Mar-24 Brightstar makes recommended takeover offer for Linden Gold Alliance Limited Catalyst MetalsVango MiningDFSJan-23661,0026610-Jan-23 Bidders Statement -Catalyst Recommended Takeover for Vango Genesis MineralsLaverton (Focus) ProjectResource DevelopmentMay-252503,9006326-May-25 Acquisition of the Laverton Gold Project AurenneAlt ResourcesPre-Feasibility StudyAug-2023571567-May-20 Alt Receives All Cash Off Market Bid from Private Equity Firm AurenneGroup (7 May 2020); Mt Ida and Bottle Creek Resource Upgrade Brings Total Resource to 571,300 Ounces Gold (2 Apr 2020) St BarbaraBardoc GoldOptimisation StudyDec-211463,0734820-Dec-21 St Barbara to acquire BardocGold via Recommended Scheme of Arrangement Brightstar ResourcesAlto MetalsResource DevelopmentAug-24441,046421-Aug-24 Brightstar to drive consolidation of Sandstone district Beacon MineralsLady Ida ProjectPre-Feasibility StudyMar-23133183924-Mar-23 Beacon Acquires Lady Ida Project Ramelius ResourcesBreaker ResourcesResource DevelopmentMar-23531,6843220-Mar-23 Ramelius Makes Recommended Takeover Offer for Breaker Res NL Brightstar ResourcesMontague East ProjectResource DevelopmentAug-2412507241-Aug-24 Brightstar to drive consolidation of Sandstone district Brightstar ResourcesKingwest ResourcesResource DevelopmentDec-2285051623-Dec-22 Brightstar and Kingwest Resources agree strategic merger to unlock significant potential value for shareholders Genesis MineralsMagnetic ResourcesDFSFeb-26606.32,40025316-Feb-26 Presentation -Magnetic Attraction Gold FieldsGold RoadProductionMay-252,6004,0506425-May-25 Gold Fields enters into binding agreement to acquire Gold Road Resources and withdrawal of cautionary announcement Capricorn MetalsWarriedar ResourcesResource DevelopmentJul-251642,0508024-Jul-25 Capricorn Metals to acquire WarriedarResources AlicantoMinerals LimitedMt Henry-Selene GoldResource DevelopmentDec-2564.69157117-Dec-25 Mt Henry-Selene Gold Divested for $64.6M 1.Enterprise values sourced CapIQon the date of the transaction announcement APPENDIX 35
Appendix 6: Peer Mineral Resource References¹ BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer TickerCompanyStage Proved (koz) Probable (koz) Total Reserve (koz) Grade (g/t) Plant Capacity (Mtpa) Production (koz/year) Source & Date Market Cap ($M) Enterprise Value ($M) EV/ Resource ($/oz) EV/ Reserve ($/oz) EV/ Production ($/oz) BTRBrightstar ResourcesOperations & DFS153353511.61.523 Quarterly Activities/Appendix 5B Cash Flow Report (30 July 2026) 3622405468510,660 BC8Black Cat SyndicateOperations143173302.41.296Quarterly Activities Report (30 July 2026)6205462161,6545,698 MEKMeeka MetalsOperationsN/aN/a3053.80.624 June 2026 Quarterly Activity Report & Appendix 5B (22 July 2026) 2722341897669,599 PNRPantoro GoldOperations1796808592.11.277 Quarterly Activities/Appendix 5B Cash Flow Report(30 July 2026) 7745711246647,373 OBMOra BandaOperations495606102.31.2155June 2026 Quarterly Activities Report (16 July 2026)2,0241,7564762,87911,327 CYLCatalyst MetalsOperations08618612.91.2104Quarterly Activities Report -June 2026 (31 July 2026)1,4371,2063491,40111,598 MI6Minerals260PFS02,5002,5000.8650 June 2026 Quarterly Activities and Cashflow Report(30 July 2026) 1,3401,243201497- AUCAusgoldDFS1,1062241,3301.13.60 Quarterly Activities/Appendix 5B Cash Flow Report (13 July 2026) 466378155284- CodeCompanyStageMeasured (koz)Indicated (koz)Inferred (koz)Total resourceGrade (g/t)Source Date BTRBrightstar ResourcesOperations & DFS52 1,8732,5324,4571.4Sandstone Mineral Resource Grows To 2.9Moz15-Jul-26 BC8Black Cat SyndicateOperations571,2691,1992,5243.0Trojan and Imperial Resources Increase to 286koz29-Jun-26 MEKMeeka MetalsOperations556455351,2353.0TurnberryMineral Resource Upgrade6-May-24 PNRPantoroGoldOperations3741,8982,3274,6013.3Annual Mineral Resource and Ore Reserve Statement22-Sep-25 OBMOra BandaOperations 991,7261,8703,6902.0Annual Mineral Resource and Ore Reserve Statement14-Jul-26 CYLCatalyst MetalsOperations02,6927593,4533.1 Putting meat on the bones of Catalyst's path to 200,000oz annual gold production 4-Aug-25 MI6Minerals260PFS0 4,4001,7006,2001.0Bullabulling Resource Increases to 6.2Moz8-Jul-26 AUCAusgoldDFS1,5316932192,4431.1Updated Definitive feasibility Study Presentation19-Dec-25 1.Market capitalisations and enterprise values as at 31 July 2026 and June2026 Quarterly cash and debt balances APPENDIX 36
Appendix 7: Peer AnnualisedProduction References¹ BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer APPENDIX 1.Annualisedproduction based on June 2026 Quarterly production run-rate and FY26 actual production from published company disclosures –small variances may occur dur to rounding. TickerCompany Annualised Production (kozp.a.) Source & Date NSTNorthern Star Resources1,543June 2026 Quarterly Activities Report (29 July 2026) EVNEvolution Mining715June 2026 Quarterly Report (15 July 2026) RRL Regis Resources379Quarterly Activities Report (24 July 2026) WGXWestgold373June 2026 Quarterly Results (22 July 2026) VAUVault Minerals337Quarterly Activities Report (29 July 2026) GGPGreatland Resources329June 2026 Quarter Production Update (29 July 2026) GMDGenesis Minerals 285Quarterly Activities Report -June 2026 (28 July 2026) RMSRamelius Resources192June 2026 Quarterly Report(29 July 2026) ALKAlkane Resources168FY26 Production Delivered, Record Cash, Dividend Proposed (21 July 2026) OBMOra Banda155June 2026 Quarterly Activities Report (16 July 2026) BGLBellevue Gold144Quarterly Activities Report (28 July 2026) CMMCapricorn Metals124Quarterly Activities/Appendix 5B Cash Flow Report (31 July 2026) CYLCatalyst Metals104Quarterly Activities Report -June 2026 (31 July 2026) EMREmerald Resources100Quarterly Report(31 July 2026) BC8Black Cat Syndicate96Quarterly Activities Report (30 July 2026) PNRPantoro Gold77Quarterly Activities/Appendix 5B Cash Flow Report(30 July 2026) MEKMeeka Metals24June 2026 Quarterly Activity Report & Appendix 5B (22 July 2026) KAUKaiser Reef22Quarterly Activities/Appendix 5B Cash Flow Report (30 July 2026) 37
Appendix 8: Peer WA Gold Developers –Resource vs Grade¹ BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer APPENDIX 38 TickerCompanyTotal Resource (koz) Grade (g/t) Source & Date Enterprise Value ($M) EV/ Resource ($/oz) MI6Minerals2606,2001.0June 2026 Quarterly Activities and Cashflow Report(30 July 2026)1,243201 AZYAntipaMinerals2,9001.3Quarterly Activities/Appendix 5B Cash Flow Report (29 July 2026)321111 STNSaturn Metals2,8300.5Quarterly Activities/Appendix 5B Cash Flow Report (31 July 2026)18064 BC8Black Cat Syndicate2,5243.0Quarterly Activities Report (30 July 2026)546216 AUCAusgold2,4431.1Quarterly Activities/Appendix 5B Cash Flow Report (13 July 2026)378155 HRNHorizon Gold2,3001.9Quarterly Activities/Appendix 5B Cash Flow Report (30 July 2026)16672 AARAstral Resources2,0721.0Quarterly Activities/Appendix 5B Cash Flow Report (27 July 2026)16580 MRTMaritana Minerals1,8781.7Quarterly Activities Report (22 July 2026)0.5- GG8Gorilla Gold Mines1,5003.8Quarterly Activities/Appendix 5B Cash Flow Report (28 April 2026)190127 1.Market capitalisations and enterprise values as at 31July 2026 and June2026 Quarterly cash and debt balances
30 JULY 2026
JUNE 2026 QUARTERLY ACTIVITY REPORT
PROJECT & CORPORATE DEVELOPMENT
o Board approves Final Investment Decision (FID) for the 100% owned Goldfields Project,
advancing Brightstar’s TARGET200 strategy focused on near-term major production growth
o All key regulatory approvals received, including Mining Development and Closure Proposal
approval from the Department of Mines, Petroleum and Exploration and Part V Works Approval from
the Department of Water and Environmental Regulation
o Engineering, Procurement and Construction (EPC) contract executed with GR Engineering
Services Limited (GRES) for the new 1.5Mtpa Laverton Processing Plant
o Execution of a strategic framework agreement with ASX-listed Aquirian Limited (ASX:AQN) to
partner for drill and blast mining services for the Goldfields Hub’s open pit operations
o Post quarter-end, Brightstar entered into a Power Purchase Agreement and LNG Supply
Agreement for the Laverton mill power station
o Goldfields Project under construction due to commence gold production in June 2027 and targeted
to produce ~75koz p.a. for an initial mine life of six years
o Following the successful completion of the fifth and final processing parcel with Genesis Minerals,
Brightstar repaid and closed out the existing working capital facility with Ocean Partners
o The Company ended the quarter with $122 million in cash on hand and undrawn net bond proceeds
of $161 million. Total liquidity of $283 million
OPERATIONS
o Safety performance continued to be strong across the Group, with no Lost Time Injuries (LTIs)
o Reconciliation received for the record processing parcel under the Ore Purchase Agreement with
Genesis Minerals:
▪ ~140kt at 2.0g/t Au for ~7,900oz recovered gold which was Brightstar’s largest parcel
in terms of tonnes and gold produced
o Total ore processed through the Genesis OPA since commencement (March 2025):
▪ ~400kt @ 2.2g/t Au for ~24koz Au recovered ounces
o Total OPA proceeds have enabled Brightstar to build out its ‘operational readiness’ to de-
risk and enable the wider Goldfields project development, including the reinvestment of cash
flows across the portfolio to support the wider Goldfields Project development
2
o In line with previous production outlook, mining production in the June quarter of
28kt @ 3.07g/t Au for 2,794oz from the Second Fortune mine
▪ Second Fortune mining is on-going, and expected to conclude mining operations in
the September quarter when it transitions into care and maintenance (C&M)
▪ The Fish mine remains in C&M (per the DFS2.0 plan) ahead of targeted re-start of
underground mining operations in 1H’CY27
EXPLORATION ACTIVITIES & MINERAL RESOURCES
o Brightstar’s aggressive drilling continued during the quarter, with programs completed at
several Sandstone Deposits. A total of 154 holes were drilled totalling 30,266m.
o The drilling programs were primarily designed to continue to improve the quality of the Mineral
Resources for inclusion in the upcoming pre-feasibility study – with a focus on infill drilling and
diamond drilling for metallurgical and geotechnical testwork.
o Excellent results were received with highlights including:
Sandstone Hub
o Vanguard Deposit:
▪ VNDD25001: 10.3m @ 6.80g/t Au from 138m
o Bull Oak Deposit:
▪ BODD25003: 214.75m @ 0.97g/t Au from 32.75m
▪ BODD25001: 186.9m @ 0.87g/t Au from 113.75m
o Indomitable East Deposit:
▪ INDD25007: 19.05m @ 3.80g/t Au from 106m, including 1.02m @ 54.5g/t Au from
102.03m
o Havilah:
▪ HVDD25001: 3.9m @ 11.9g/t Au from 105m, including 0.98 @ 38.4g/t Au from
107.42m
o Achilles:
▪ ACRC26014: 5m @ 5.34g/t Au from 102m and 4m @ 3.05g/t Au from 183m
▪ ACRC26002: 4m @ 4.5g/t Au from 82m
o Two Mile Hill-Shillington:
▪ Multiple visible gold occurrences intersected in several diamond drillholes at the Two
Mile Hill deposit, part of the 2.4Moz @ 1.5g/t Au Sandstone Gold Project
▪ The ~9,100m RC and diamond drilling program is designed to infill areas of the
Mineral Resource at depth for inclusion in the pre-feasibility study targeted for
delivery in 2H’CY26
3 OPERATIONS OVERVIEW Brightstar Resources Ltd (Brightstar or the Company) (ASX: BTR) is pleased to announce updates on its operational activities for the June 2026 quarter as outlined below. Production Summary
SepQ 2025 DecQ 2025 MarQ 2026 JunQ 2026
Unit Total Total Total Total Mining operations
Development ore:
Ore mined kt 33.0 30.8 7.4 4.0 Grade mined g/t Au 3.01 2.27 3.47 2.39 Contained gold oz 3,192 2,246 820 309 Stope ore:
Ore mined kt 36.2 57.6 51.4 24.2 Grade mined g/t Au 3.27 3.03 3.29 3.19 Contained gold oz 3,810 5,600 5,431 2,486 Total ore mined:
Ore mined kt 69.2 88.3 58.7 28.3 Grade mined g/t Au 3.15 2.76 3.31 3.07 Contained gold oz 7,002 7,846 6,250 i 2,794 i
Metres advanced:
Operating m 783 677 457 205 Capital (drives) m 340 399 249 - Capital (decline) m 368 304 186 - Total metres m 1,491 1,380 892 205 i. The Fish underground mine transitioned to interim care & maintenance in February 2026 as outlined in the DFS 2.0 mine plan and to coincide with the completion of the Genesis OPA, which contributed to reduced production during the March and June Quarters.
FIFTH GOLD PROCESSING CAMPAIGN COMPLETED
During the March quarter, ore processing for the fifth and final campaign was completed at Genesis Minerals
Ltd’s (ASX:GMD) Laverton Mill under the Ore Purchase Agreement (OPA). This was reconciled during the June
quarter.
The fifth parcel comprised a record parcel size for the Company – both in terms of tonnes processed and
gold poured – with a total of ~140kt of ore processed, at a reconciled blended head grade of 2.0g/t Au,
which recovered ~7,900oz Au at an 89.1% recovery.
This completed Brightstar’s OPA with Genesis under which total ore of ~400kt @ 2.2g/t Au was processed
recovering ~24koz Au delivering $138M in gross sales proceeds.
4
The OPA has enabled Brightstar to build out its ‘operational readiness’ in preparation for its gold production
growth strategy in the Goldfields district with OPA cash flows reinvested across the portfolio – particularly
the build out of the Company’s Laverton footprint to support larger scale mining operations as planned
feed for Brightstar-owned processing infrastructure to leverage sunk capital across camps, haul roads,
workshops and other supporting infrastructure.
FINANCIAL SUMMARY
During the June quarter, the Company continued to incur expenditure on development related to
advancing the Goldfields Project in-line with the project development plan outlined in the DFS 2.0. Costs
were incurred under the ‘Early Works Agreement’ Brightstar had in place with GRES up until the execution
of the formal EPC contract, as announced on 26 May 2026. A total of $18.3M expenditure was incurred
relating to the Laverton Mill construction during the June 2026 quarter.
During the quarter, Brightstar incurred $8.7M of expenditure at the Second Fortune Mining Operation
(including mining costs of $6.0M and $2.7M of other site related expenditure) associated with the build-
up of stockpiles to provide early feed for the Laverton Mill.
At the Fish operation, care and maintenance costs of $0.5M were incurred.
The Company incurred exploration and studies expenditure of $11.7M and corporate expenditure of
$4.1M for the June 2026 quarter.
Figure 1: Brightstar’s Project Hubs
5
MINING & DEVELOPMENT OPERATIONS OVERVIEW
SECOND FORTUNE UNDERGROUND MINE
During the June quarter, Second Fortune mined a total of 28.3kt @ 3.07g/t Au for 2,794oz, comprised of:
o 4,022t @ 2.39 g/t Au of development ore, and
o 24,244t @ 3.19 g/t Au of stope ore.
Total development for the quarter was 205m, consisting of exclusively operating development meters with
no decline or capital development occurring as Second Fortune transitions into C&M.
Mining continues at Second Fortune with current Life of Mine (LOM) plan scheduled to cease in SepQ’CY26
– all ore mined from Second Fortune from April 2026 is now being stockpiled for processing through
Brightstar’s Laverton processing plant once commissioned in mid-CY27.
Following LOM changes related to DFS 2.0 In January, the Decline was developed down to the 955 Level and
capital development works ceased. Development ore driving continued on the 995 and 975 levels with
stoping occurring on the on the 1015 and 995 levels.
Second Fortune ended the quarter with a ROM stockpile of approximately 30,077t @ 3.09g/t for 2,983oz
which will be stockpiled ahead of haulage to Brightstar’s Laverton Processing plant in CY2027.
FISH UNDERGROUND MINE
The Fish mine transitioned into C&M in March with non-essential mobile equipment and infrastructure being
demobilised from site.
In the June quarter, the Fish mine commenced preparations for the upcoming underground diamond drilling
program, with additional management resourced to site and drill platforms setup underground. The drilling
program subsequently commenced in the first week of July and is designed to improve the grade control
data for the Stage 2 mine plan (infill) and test for extensions at depth beneath the current mine plane (growth
drilling).
The Fish ROM contains approximately 13,285t @ 2.93g/t for 1,252oz ready for immediate haulage on
completion of the Brightstar Laverton Processing Plant.
Additionally, the 1350 level underground contains two stoping blocks with drill stocks and is setup for
immediate restart to mining in CY2027.
The mine remains in a state of operational readiness, with limited care and maintenance costs owing to the
minimal water reporting to the underground and dewatering activities only required for two days during
each month.
6
GOLDFIELDS DEVELOPMENT OVERVIEW
In January 2026, following a competitive Front-End Engineering and Design (FEED) process, Brightstar
executed an Early Works Agreement (EWA) with GR Engineering Services Limited. The EWA enabled critical
pre-FID activities to commence, including procurement of long-lead equipment such as the SAG mill and
variable speed drive, together with continued detailed engineering and operational readiness activities. This
established a seamless pathway into full project execution upon board approval.
In May 2026, Brightstar announced that its Board of Directors had approved Final Investment Decision (FID)
for the development of its 100%-owned Goldfields Project in Western Australia. The FID followed receipt of
the final key regulatory approvals, including the Mining Development and Closure Proposal (MDCP) from the
Department of Mines, Petroleum and Exploration (DMPE) and the Part V Works Approval from the
Department of Water and Environmental Regulation (DWER).
With these approvals in place, together with execution of the Engineering, Procurement and Construction
(EPC) contract with GRES, Brightstar immediately transitioned from early works into full-scale construction
of the new 1.5 Mtpa Laverton processing plant.
Following FID, Brightstar immediately accelerated the next phase of the Goldfields project development,
including:
• commencement of full-scale construction activities at the Laverton processing plant site in late May
2026;
• finalisation and execution of remaining construction, infrastructure and operational contracts,
including the execution of the Power Purchase Agreement and LNG Supply Agreement after the
quarter-end;
• full mobilisation of project delivery teams and contractors;
• preparation for commencement of open pit mining at Lord Byron from late CY26 and the
recommencement of stoping at the Fish underground mine in early CY27 (both located ~55km from
the Laverton processing plant site); and
• ongoing operational readiness, recruitment and commissioning planning.
The Company remains focused on delivering the Goldfields Project safely, on schedule and within budget as
it builds toward becoming a substantial mid-tier Western Australian gold producer.
POWER CONTRACTS
During the quarter, commercial negotiations and documentation with Brightstar’s preferred supplier for the
LNG power solution for the Goldfields Project continued.
After the quarter-end, Brightstar executed an integrated energy solution for the Laverton mill, comprising a
long-term Power Purchase Agreement with PWR Hybrid Solutions and a dedicated LNG Supply Agreement
with EVOL LNG, both portfolio companies of OCTA Group (OCTA).
The integrated solution combines contractor-owned gas-fired power generation, LNG storage, regasification
and fuel supply infrastructure under a coordinated energy platform. The LNG infrastructure includes three
on-site LNG storage vessels and associated facilities supporting long-term fuel supply security.
7
The integrated structure is intended to reduce interface risk by aligning fuel supply and power generation
under a coordinated contractual framework.
Key Benefits of LNG Relative to a Conventional Diesel-Fired Alternative
Compared with a traditional diesel-powered solution, the integrated LNG and gas-fired power model is
expected to provide:
• Lower exposure to diesel as a fuel and particularly diesel price volatility.
• Improved long-term energy cost competitiveness.
• Lower emissions intensity through the use of LNG-fuelled generation.
• Reduced upfront project capital requirements through contractor ownership of power and fuel
infrastructure.
The Power Station has been designed with future generator connection provisions, spare electrical capacity
and expansion infrastructure to accommodate potential future increases in Laverton mill processing
capacity.
OCTA is an Australian energy infrastructure business providing energy solutions to the resources sector.
Through PWR Hybrid Solutions and EVOL LNG, OCTA develops, owns and operates power generation, LNG
storage and "virtual pipeline" distribution including associated energy infrastructure under long-term service
agreements, enabling mining companies to access critical energy infrastructure without significant upfront
capital investment. OCTA Group is backed by I Squared Capital, a global infrastructure investment manager
with investments across energy, utilities, transport and industrial infrastructure sectors internationally.
Figure 2 - Site remediation and establishment works underway (May 2026, pre-FID)
8
Figure 3 - Construction activities underway (June 2026, post-FID) Top: First concrete pour for CIL circuit footings and SAG mill circuit construction (L); bulk earth works for crushing circuit (R) Bottom: Process and raw water ponds being constructed and NPI pad preparation (L); on-going earth works (R)
Figure 4 - Design render of the 1.5Mtpa Laverton Processing Plant
9
Figure 5 - Project Execution Timetable
SANDSTONE PRE-FEASIBILITY STUDY
Brightstar’s exploration and project development teams continue to make meaningful progress on
advancing the Sandstone Gold Project through the pre-feasibility study (PFS) assessment towards
development.
PFS workstreams progressed rapidly during the quarter and remain on track for completion in the DecQ’26.
The PFS will include the declaration of a maiden Ore Reserve and will assess an initial development scale
with potential for future expansion.
Brightstar is utilising a number of the same experienced contractors and consultants who are involved in
Brightstar’s Goldfields Project, delivering work flow synergies, technical continuity and efficiencies
throughout the PFS.
Processing Plant
PFS design and engineering of the processing plant has commenced with GR Engineering, with studies
focused on optimising plant throughput and capital efficiency. Consistent with Brightstar’s development
strategy for the Goldfields Processing Plant, the Sandstone processing plant is being designed with
embedded optionality for increasing future throughput expansion. Brightstar and GRES are working
collaboratively to ensure the design is scalable and capable of supporting long-term production growth.
10
Metallurgical
Metallurgical test work supporting the PFS is well advanced and on-going, with metallurgical drilling for PFS
testwork largely completed.
Permitting, Heritage & Water
Environmental and technical studies are ongoing to support statutory approvals, with work focused on
informing project design, minimising environmental impacts and facilitating timely progression through
regulatory processes.
Heritage assessments are being undertaken across the Sandstone Project area, with surveys completed or
planned where appropriate to support proposed mining and key infrastructure areas.
Water exploration activities have identified multiple potential sources, including paleochannel and hard
rock aquifers, to support development and operations.
Non-Process Infrastructure
Infrastructure studies are underway, including non-process infrastructure, access and haul roads,
communications and village. Sandstone benefits from being an area with extensive historical mining activity,
with existing access and haul roads, existing camp and town facilities in place.
Tailings Storage Facility
Tailings Storage Facility design and engineering activities are underway. The identification of a suitable
location and preferred construction methodology is nearing finalisation.
Geotechnical
Geotechnical drilling and sample collection for the PFS has been completed, with on-going logging and
analysis underway.
Mining
Mine pit optimisation, design and scheduling activities are progressing across the study, with ongoing
refinement of the proposed mining strategy.
Construction & Operational Readiness
An experienced owner's team has been established within Brightstar to deliver both the Goldfields and
Sandstone Gold Projects. Brightstar is well positioned to execute these sequential projects by retaining its
established project team and leveraging the experience, intellectual property, systems and delivery expertise
developed through the Goldfields Project. This strategy is expected to enhance execution certainty, improve
delivery efficiency and maximise the value of both asset bases and development plans.
EXPLORATION ACTIVITIES OPERATIONS OVERVIEW
SANDSTONE DRILLING ACTIVITIES
During the June Quarter, Brightstar completed drilling campaigns at the Two Mile Hill-Shillington,
Vanguard, Bull Oak, Havilah, Lord Nelson and Indomitable Camp Deposits at the Sandstone Project
(Figure 6), and at the Montague-Boulder and Achilles Deposits at the Montague Project.
Post quarter-end, the Mineral Resource Estimate (MRE) for the Sandstone Gold Project was upgraded
to 2.9Moz @ 1.3g/t Au.
11
Figure 6: Geology of Brightstar’s Sandstone Project showing deposit and prospect locations.
Bull Oak
Prior to the recent MRE upgrade, the Bull Oak deposit hosted a MRE of 2.5Mt @ 1.1g/t Au for 90koz Au,
limited by sparse drilling below 100m vertical depth. Mineralisation is hosted by sheeted, shallowly east-
dipping veins sets within a granodiorite intrusion, with further mineralisation hosted by banded iron units
(BIFs) truncated by the intrusion. This geological setting is similar to that of Brightstar’s nearby Shillington-
Two Mile Hill deposit (MRE of 0.7Moz @ 1.5g/t Au).
The current program of RC and diamond drilling targeted areas below and adjacent to the existing
resource, to facilitate the upgrade to the MRE delivered in July. The Bull Oak MRE was subsequently updated
to 10.5Mt @ 1.0g/t Au for 322koz Au.
A total of four diamond drillholes for ~1,00m were drilled from surface, primarily for structural and
geotechnical data, as well providing mass for metallurgical test work for the Pre-Feasibility Study underway.
A total of four diamond tails for 534m were completed to extend previous RC drill holes drilled in 2025 that
failed to fully test the host granodiorite unit at depth. A total of 6 RC drill holes for 1,050m were drilled
targeting extensions to BIF hosted gold mineralisation adjacent to the north-eastern contact with the
granodiorite
12
A further 8 RC drill holes with diamond tails (RCDT) were planned as depth extensions beneath the existing
mineral resource (Figure 7), targeting the main stockwork, sheeted quartz vein mineralisation historically
mined in the main Bull Oak pit and historic workings. Drilling was designed to delineate the mineralised
lodes and facilitate a Mineral Resource update incorporating these extensions.
Significant results for the diamond drilling include:
BODD25001
• 10.82m @ 2.91g/t Au from 271.68m
• 13m @ 2.26g/t Au from 173m
• 13.65m @ 1.16g/t Au from 113.75m
• 6m @ 1.88g/t Au from 151m
• 1.19m @ 11.3g/t Au from 254m
The high-grade intervals were present within a wide halo of lower grade material, which reported an
unconstrained intercept of 186.9m @ 0.87g/t Au from 113.75m in BODD25001
BODD25003
• 7m @ 17.7g/t Au from 138m, including 0.7m @ 136g/t Au from 144.3m
• 0.78m @ 43.7g/t Au from 88m
• 0.30m @ 175.3g/t Au from 277.4m
• 0.30m @ 81.6g/t Au from 247.2m
BODD25003 reported an unconstrained intercept of 214.75m @ 0.97g/t Au from 32.75m
Significant results for the RCDT (RC pre-collars and diamond tails) drilling include:
• 1m @ 21.9g/t Au from 310 in BORC25009
• 2m @ 7.49g/t Au from 16m in BORCD26001
• 0.48m @ 28.6g/t Au from 153.52m in BORCD26001
• 1m @ 14.1g/t Au from 172m in BORCD26001
• 7.5m @ 1.98g/t Au from 205.5m in BORCD26002
• 20m @ 1.07g/t Au from 224m in BORCD26002
• 5m @ 2.21g/t Au from 32m in BORCD26003
• 8m @ 5.09g/t Au from 75m in BORCD26003, including 1m @ 17.4g/t Au from 77m in
BORCD26003
Significant results for the RC drilling include:
• 10m @ 4.00g/t Au from 80m, including 1m @ 31.4g/t Au from 82m in BORC26003
• 3m @ 24.3g/t Au from 94m, including 1m @ 59.5g/t Au from 94m in BORC26003
The high-grade intervals were typically present within wide haloes of lower grade material. Significant
intercepts for these wide zones for the RCDT drilling include:
13 • 177m @ 0.58g/t Au from 204m in BORCD25009 • 272.5m @ 0.53g/t Au from 16m in BORCD26001 Drilling is ongoing at Bull Oak targeting the area beneath the existing MRE, in order to delineate the mineralised lodes and facilitate a Mineral Resource update incorporating these extensions.
Figure 7: Drill section at the Bull Oak Deposit. Looking Northwest. +/- 20m.
Vanguard
The Vanguard Camp at Sandstone hosts a MRE of 3.7Mt @ 1.8g/t Au for 217koz Au. Gold mineralisation at
the Vanguard Camp is located along NW-SE trending structures within a differentiated dolerite unit.
At Vanguard North, the lode geometry is relatively simple, hosted within a single quartz vein dipping
shallowly to the southwest (Figure 8). The vein is consistently present featuring variable, nuggety gold
mineralisation, which is considered typical for this type of narrow vein-hosted deposit.
The larger Vanguard deposit consists of multiple mineralised lodes, predominantly dipping moderately to
the NE, although flat-lying supergene lodes are also present. High-grade mineralisation intersected in the
drilling is typically associated with quartz veining and abundant pyrite.
The recent program of 4 diamond drill holes for 613m were drilled primarily for structural, geotechnical
and metallurgical purposes to support future resource upgrades and provide data for the Pre-Feasibility
Study underway.
14 Significant intercepts from the drilling include: • 10.3m @ 6.80g/t Au from 138m, including 2m @ 25.1g/t Au from 144m in VNDD25001 • 6.76m @ 2.12g/t Au from 126.24m in VNDD25001
Figure 8: Drill section at the Vanguard Deposit. Looking Northwest. +/- 10m
Indomitable Camp
The ‘Indomitable Camp’ is situated 12km southeast of Sandstone townsite. The camp comprises three main
deposits (Indomitable, Indomitable East, and Musketeer), as well as three minor resources (Ladybird, Piper
and Tigermoth).
The Musketeer deposit is located with the Indomitable Camp, which hosts a total MRE of 8.2Mt @ 1.1g/t Au
for 296koz Au
The Musketeer deposit hosts a modest MRE of 1.4Mt at 1.3g/t gold for 59koz, with mineralisation
associated with a northeast-striking banded iron formation (BIF) within a mafic-ultramafic package, crosscut
by northwest-southeast structures.
The recent program of 11 RC drillholes for ~1,440m was designed to infill mineralisation within a portion
of the current mineral resource, ensuring sufficient drill spacing for future MRE updates to support Indicated
resource classification for inclusion within the upcoming PFS.
15 Significant results returned from recent infill drilling at Musketeer include: • 5m @ 2.37g/t Au from 73m in INRC26004 • 3m @ 4.79g/t Au from 81m in INRC26005 • 11m @ 1.07g/t Au from 138m in INRC26005
Indomitable East
The Indomitable East deposit is situated within the Indomitable Camp and located 3km from the Musketeer
deposit. The gold mineralisation at Indomitable East is hosted within a northwest-trending sequence of
jaspilitic banded iron formation, intercalated with deeply weathered ultramafic rocks. The BIF outcrops at
surface in the area and dips steeply to the north. Mineralisation is typically characterised by a visible zone of
pyrite+/-quartz veining associated with the band iron formation units and appears to increase when
proximal to two interpreted cross cutting structures.
The recent program of 2 diamond drill holes for 320m were drilled primarily for structural, geotechnical
and metallurgical purposes to support future resource upgrades and provide data for the Pre-Feasibility
Study underway.
Significant results from include:
• 19.05 @ 3.80g/t Au from 106m, including 1.02m @ 54.5g/t Au from 102.03m in INDD25007
• 14m @ 1.41g/t Au from 62m in INDD25008
Mineralisation remains open at depth and along strike, and there is opportunity to further grow the current
mineral resource with additional drilling.
Lord Nelson The Lord Nelson Deposit hosts a total resource of 5.6Mt at 1.6g/t Au for 291koz Au. The mineralisation at Lord Nelson is mostly within a granodiorite intrusion, the Lords Granodiorite, with a high-grade zone on the
BRIGHTSTAR RESOURCES LIMITED Building a Multi-Asset Western Australian Gold Producer Fully funded developer with a Tier-1 growth asset in the Go Bay ASX : BTR INVESTOR PRESENTATION · JULY 2026
Important Notices & Disclaimers Important Notices •Thispresentation(Presentation)hasbeenpreparedbyBrightstarandhasbeenauthorisedforreleasebytheBoardofDirectorsofBrightstaronthebasisitistobereadinconjunctionwiththeseimportantnoticesanddisclaimers. •ThisPresentationdated16July2026hasbeenpreparedbythemanagementofBrightstarResourcesLimited(ACN100727491)(“B ”,“Brightstar”or“ ompany”). Disclaimer •ThisPresentationhasbeenpreparedbyBrightstarbasedoninformationfromitsownandthird-partysourcesandisnotadisclosuredocument.NopartyotherthanBrightstarhasauthorisedorcausedtheissue,lodgement,submission, despatchorprovisionofthisPresentation,ortakesanyresponsibilityfor,ormakesorpurportstomakeanystatements,representationsorundertakingsinthisPresentation.Exceptforanyliabilitythatcannotbeexcludedbylaw,Brightstar anditsrespectiverelatedbodiescorporate,directors,employees,advisersandagentsdisclaimandacceptnoresponsibilityorliabilityforanyexpenses,losses,damagesorcostsincurredbyanypartyrelatinginanywaytothisPresentation including,reliancewithoutlimitation,theinformationcontainedinorprovidedinconnectionwithit,anyerrorsoromissionsfromithowevercaused,lackofaccuracy,completeness,currencyorreliabilityoryouoranyotherpersonplacinganyon thisPresentation,itsaccuracy,completeness,currencyorreliability. •ThisPresentationisnotaprospectus,disclosuredocumentorotherofferingdocumentunderAustralianlaworunderanyotherlaw.Itisprovidedforinformationpurposesandisnotaninvitationnorofferofsharesorrecommendationfor subscription,purchaseorsaleinanyjurisdiction.ThisPresentationdoesnotpurporttocontainalltheinformationthataprospectiveinvestormayrequireinconnectionwithanypotentialinvestmentinBrightstar.Eachrecipientmust makeitsownindependentassessmentofBrightstarbeforemakinganinvestmentdecision. Forward-Looking Statements •ThisPresentationcontainscertain"forward-lookingstatements".Thewords"expect","anticipate","estimate","intend","believe","guidance","should","could","may","will","predict","plan"andothersimilarexpressionsareintendedtoidentify forward-lookingstatements.Indicationsof,andguidanceon,futurefinancialpositionorperformancearealsoforward-lookingstatements.Forward-lookingstatements,opinionsandestimatesprovidedinthisPresentationarebasedon assumptionsandcontingencieswhicharesubjecttochangewithoutnoticeandinvolveknownandunknownrisksandcertaintiesandotherfactorswhicharebeyondthecontrolofBrightstaranditsdirectorsandmanagement.Forward-looking statementsareprovidedasageneralguideonlyandshouldnotberelieduponasanindicationorguaranteeoffutureperformance.Actualresults,performanceorachievementsmaydiffermateriallyfromthoseexpressedorimpliedinsuch statementsandanyprojectionsandassumptiononwhichthesestatementsarebased.ThesestatementsmayassumethesuccessofBrightstarbusinessstrategies.Thesuccessofanyofthosestrategieswillberealisedintheperiodforwhich theforward-lookingstatementmayhavebeenpreparedorotherwise.Readersarecautionednottoplaceunduerelianceonforward-lookingstatements,particularlyinlightofthecurrenteconomicclimateandthesignificantvolatility,andexcept asrequiredbylaworregulation,noneofBrightstarortheirrespectiverepresentativesoradvisersassumesanyobligationtoupdatetheseforward-lookingstatements.Norepresentationorwarranty,expressorimplied,ismadeastothe accuracy,likelihoodofachievementorreasonablenessofanyforecasts,prospects,orstatementsinrelationtofuturematterscontainedinthisPresentation.Theforward-lookingstatementsarebasedoninformationavailabletoBrightstarasat thedateofthisPresentation.Exceptasrequiredbylaworregulation(includingtheASXListingRules),noneofBrightstarandtheirrespectiverepresentativesoradvisersundertakesanyobligationtoprovideanyadditionalorupdatedinformation whetherasaresultofachangeinexpectationsorassumptions,newinformation,futureevents,orresultsorotherwise.Indicationsof,andguidanceoroutlookonfuturefinancialpositionorperformancearealsoforward-lookingstatements. Aspirational Statements •ThestatementswhichmayappearinthisPresentationregardingtheaspirationsforBrightstartoundertakeconstructionofaSandstoneprocessingplantin2H’ Y27forfirstgoldproductionin2H’ Y28,aligningwithcontinuedplannedproduction growthfromBrightstar’sLavertonandMenzieshubstoaspirationallytargetGroupproductionprofileof+200kozp.a.by2029,areaspirationalstatements.ThesestatementsarenotproductiontargetsasBrightstardoesnotyethavesufficient objectivereasonablegroundstobelievethatthestatementscanbeachieved. •Importantly,thestatementsareconsideredaspirationalbecause,asdisclosedinitsASXannouncementdated30April2025titled‘ andstonegoldprojectacceleratingtowardsdevelopment’(April2025Announcement),Brightstarhasnotyet completedapre-feasibilitystudyforSandstone,notingthatSandstonehasalongoperatinghistorywithdetailedinformationavailableonhistoricalperformanceacrossthemajorityofdeposits,oremineralisationstylesandoperatingparameters (i.e.openpitminingandconventionalcarbon-in-leachprocessingconductedintherecentpast).Whilepreliminaryassessmentshavebeenundertaken,asdisclosedintheApril2025Announcement,substantialfurtherworkisrequiredbefore BrightstarwillbeinapositiontohavesufficientobjectivereasonablegroundstopublishproductiontargetsorforecastfinancialinformationrelatingtotheSandstoneProject. •Thestudywillneedtoconsideranumberofvariablesandfocusareaswhichareexpectedtoinclude,butarenotlimitedtoitemswithinthefollowingfeasibilitystudyworkstreams:preparingrobustupdateMineralResourceEstimatesforeach depositbasedongeologicalmodelsgeneratedbyexistingandnewgeologicalinformationinformedbyBrightstar’scurrentdrillingprograms;applyingcurrent(CY26)miningcostandoperationalparameterstodelineateeconomicmining optimisations,openpitminedesignsandschedulesthatencapsulatesgeotechnicalandmetallurgicalrecoveryinformationfromthirdpartytestwork;assessmentsintoapprovalsandpermittingprocesses,alongwithdetailedengineeringdesign work,optimalprocessingflowsheetsandrequisiteinfrastructurethatdeliversthebestoutcomeofrecoveredmetal,operatingcostsandcapitalcostswhichsupportstheseaspirations. •BrightstarconfirmsthattheinclusionofAspirationalStatementsinthispresentationarebasedentirelyontheAprilAnnouncementandcontainsnonewinformation. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 2
Important Notices & Disclaimers Not Investment Advice •EachrecipientofthePresentationshouldmakeitsownenquiriesandinvestigationsregardingallinformationinthisPresentationincludingbutnotlimitedtotheassumptions,uncertaintiesandcontingencieswhichmayaffectfutureoperationsof Brightstarandtheimpactthatdifferentfutureoutcomesmighthave.InformationinthisPresentationisnotintendedtoberelieduponasadvicetoinvestorsorpotentialinvestorsandhasbeenpreparedwithouttakingaccountofanyperson’s individualinvestmentobjectives,financialsituationorparticularneeds.Beforemakinganinvestmentdecision,prospectiveinvestorsshouldconsidertheappropriatenessoftheinformationhavingregardtotheirowninvestmentobjectives, financialsituationandneedsandseeklegal,accountingandtaxationadviceappropriatetotheirjurisdiction.Brightstararenotlicensedtoprovidefinancialproductadviceinrespectoftheirsecurities. Feasibility Study -Cautionary Statement Goldfields ProjectFeasibility Study •The production targets and forecast financial information disclosed in this presentation were first announced in accordance withA X isting ules 5.16 and 5.17 in the ompany’s announcement ‘ pdated Goldfields Feasibility tudy” dated 29 January 2026. •Unless otherwise stated, the Company confirms that all material assumptions underpinning the production targets and forecast financial information derived from the production targets in the original DFS release 1 continue to apply and have not materially changed. •The Company cautions that a portion of the production target (27%) is based on Inferred Mineral Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production targets themselves will be realised. Production Target •The Production Target (and forecast financial information derived from the Production Target) referred to in this announcement is underpinned by Measured and Indicated Mineral Resources of approximately 73% and Inferred Mineral Resources of approximately 27% over the DFS period. •The total Life of Mine Production Target includes 27% Inferred Resources, 3% Indicated Resource outside of Reserve and the remaining 70% is underpinned by Proven and Probable Ore Reserves. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the Production Target itself (or the forecast financial information) will be realised. Competent Persons Statements •The Mineral Resources and Ore Reserves estimates disclosed in this Presentation were first disclosed in accordance with ASX Listing Rules 5.8 and 5.9 in the announcements as cross-referenced. Brightstar confirms that it is not aware of any new information or data that materially affects the information included in the relevant announcement and that all material assumptions and technical parameters underpinning the estimates in the previous announcements continue to apply and have not materially changed. Currency •Unlessotherwisestated,alldollarvaluesinthisPresentationarereportedinAustraliandollars. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 3
INVESTMENT HIGHLIGHTS 4.5Moz -Fully funded gold developer executing on major production growth Two large-scale production centresto unlock Brightstar's TARGET200 strategy¹
- Refer to the Aspirational Statements disclaimer on page 2.
- Refer to Appendices 2-4 for Mineral Resource estimates and Ore Reserve statement.
- Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026.
- Assuming A$6,000/oz. Financial metrics are presented on a pre-tax basis -as at31 December 2025, Brightstar had $209M of Group tax losses which are anticipated to be utilisedfor minimisingultimate tax expense.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
MAJOR PRODUCTION GROWTH ACROSS TWO WA PROJECTS²
•~4.5Moz Mineral Resources & 351koz Ore Reserves on granted Mining Leases
•Immediate production growth at Goldfields with Sandstone to deliver scale
•Targeting to be a Top 10 Australian producer
01
COMPELLING NEAR-TERM GOLDFIELDS DEVELOPMENT³
•FULLY FUNDED: A$193M equity & US$120M debt funding package Q1 CY26
•6-year plan averaging 75koz p.a.
•New 1.5Mtpa CIL plant upgradeable to 2.5Mtpa
•First gold targeted June 2027
02
GOLDFIELDS HUB -MATERIAL FREE CASH FLOW³⁴
•Pre-tax NPV $606M | Pre-tax IRR 74% | Average FCF $163M p.a.
•LOM AISC $2,998/oz
•Cash generation from Goldfields to contribute to delivery of Sandstone 03 SANDSTONE -POTENTIAL TIER-1 WA DEVELOPMENT² •Targeted to deliver distinct scale, long-life production centre •Updated MRE of 2.9Moz @ 1.3g/t Au provides the platform for future growth •Fully funded to DFS and FID 04 4
CORPORATE SNAPSHOT
Team & funding in place –platform for major production growth
BOARD OF DIRECTORS
Richard Crookes
Non-Executive Chairman
Alex Rovira
Managing Director
Andrew Rich
Executive Director -
Operations
Jonathan Downes
Non-Executive Director
RESEARCH COVERAGE
1.Refer to cash based as atMarch 2026 per Quarterly Activities/Appendix 5B Cash Flow Report (29 April 2026) plus Feb-Mar '26 gross capital raising less Ocean Partners facility balance debt. Share price as at23 June 2026. Monthly liquidity based on last six trading months sourced from IRESS.
2.Includes gross Bond proceeds converted at 0.72 AUD/USD.
Please see Research notes available on Brightstar Website for Disclaimers and Disclosures.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
HNW/Retail
40%
Institutional
46%
S tr ategics &
M ining
Industry 12%
B o a r d/M a n a g e m e n t
2%
SHARE PRICE
$0.33
(AUD) As at15July 2026
REVENUE PROTECTION
60koz
Put options @ A$5,809/oz
MARKET CAP
$362M
1,098M shares on issue
ENTERPRISE VALUE
$200M
EV / Resource $45/oz
NET CASH
1
$163M
As per arQ’26 quarterly
MINERAL RESOURCES
4.5Moz
99Mt at 1.4g/t Au
AVAILABLE, UNDRAWN DEBT
US$120M
Nordic Bond
AVG MONTHLY LIQUIDITY
~$80M
6-month average liquidity
SHARE PRICE PERFORMANCE
SHAREHOLDERS
5
5 10 15 20 25 30 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Feb-24Apr-24Jun-24Aug-24Oct-24Dec-24Feb-25Apr-25Jun-25Aug-25Oct-25Dec-25Feb-26Apr-26Jun-26 Volume (m shares) Share Price ($/share) VolumeClose Price
Leadership Experienced team in place to execute BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 6 B O A R D O F D I R E C T O R SM A N A G E M E N T T E A M Richard Crookes Geologist · Finance · 35+ yrs Non-Executive Chairman •Managing Partner, Lionhead Resources; ex-Investment Director, EMR Capital & ED, Macquarie Metals & Energy Capital •NE Chairman, Black Rock Mining (ASX:BKT); former Chief Geologist & Mining Manager, Ernest Henry Mining Alex Rovira Geologist · Finance · 14+ yrs Managing Director •MD of Brightstar since January 2023; BSc (Geology & Env. Science), BCom (IB & Corporate Finance) •14+ years' executive leadership & investment banking at Canaccord Genuity across ECM and M&A in metals & mining Andrew Rich Mining Engineer · 15+ yrs Executive Director –Operations •Leads Brightstar's operations; delivery of WA gold projects at Linden, Ramelius & Westgold •BEng (WASM) & WA First Class Mine Manager's Certificate; NED of Javelin Minerals (ASX:JAV) Jonathan Downes Geologist · 25+ yrs Non-Executive Director •Gold & base metals expertise spanning exploration through to production •Managing Director, Dundas Minerals (ASX:DUN); NED of Cazaly Resources (ASX:CAZ) Nicky Martin Finance · CPA · 20+ yrs Chief Financial Officer •7 years at Pilbara Minerals (ASX:PLS), latterly Head of Finance —through Pilgangoora financing, construction & ramp-up into the ASX50 •Deep experience across finance, accounting, offtake, hedging, tax & treasury Daniel Jolley Mechanical Engineer · 20+ yrs Project Director •Processing plant delivery expertise, most recently Northern Star / De Grey Mining's 10Mtpa Hemi Gold Project •Leading Laverton plant execution & Sandstone engineering; prior delivery roles with Mineral Resources & FMG Samuel Main Corporate Development · 12+ yrs Corporate Development Officer •Expertise in financing, capital markets, organic & inorganic growth and investor relations •12+ years' experience across capital markets and M&A Jonathan Gough Geologist · 15+ yrs General Manager –Geology •Proven WA gold geology executive across production, resource definition & exploration •Ex-Exploration Manager, Musgrave Minerals —pivotal to the Cue Gold Project prior to the Ramelius takeover Katherine Hughes Human Resources · 15+ yrs Chief Human Resources Officer •Strategic HR, industrial relations & transformation across mining, manufacturing and transport •Leads people strategy, culture & leadership capability supporting Brightstar's growth Brendan Bow Environment & Approvals · 20+ yrs Environment & Approvals Manager •WA mining environmental, approvals, heritage & land access professional •Leading approvals, permitting & compliance across the Goldfields & Sandstone developments Julie Budrey Health & Safety · 25+ yrs Group Health & Safety Manager •Proven record building safety performance & workforce culture across WA mining operations •Ex-Group HSET Manager, Emeco Holdings; ex-Group OHS Manager, Westgold Resources
Goldfields Project Executing on a fully funded pathway to +75koz p.a. –First gold June 2027
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 8 1.5Mtpa Laverton Plant Goldfields Construction Underway
GR Engineering appointed to construct 1.5Mtpa Laverton Plant 1 Fixed-price EPC contract de-risks the construction phase, with embedded capacity to cost-effectively expand to 2.5Mtpa during operations ▸Conventional 1.5Mtpa CIL processing plant with embedded engineering design for expansion to 2.5Mtpa during operations ▸Lump-sum, fixed-price EPC delivery model selected for construction of new processing infrastructure ▸Long lead-time orders awarded to de-risk development schedule ▸Preferred gas-fired power pathway delivers de-risked energy source ▸LOM average processing cost of A$31/t processed 2 ▸Plant design based on consolidated metallurgical parameters across all mine sites -delivering LOM average recoveries of 91% 2 ▸FID declared and construction activities commenced in JunQ’26 INITIAL CAPACITY 1.5Mtpa Delivering 75koz p.a. EXPANSION UPSIDE 2.5Mtpa Pre-engineered for upside optionality LOM RECOVERY 91% Recovering 457koz Au over 6 yr LOM 1.Refer ASX announcement “GR Engineering appointed as Preferred Contractor –Laverton Processing Plant’ dated 17 February 2026. 2.Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Laverton Processing Plant –1.5Mtpa design render GOLDFIELDS PROJECT LOM UNIT COST $31/t Per tonneprocessed 9
GOLDFIELDS PROJECT
De-risked development pathway -stagedopen-pit & underground mining
New 1.5Mtpa processing plant unlocks existing 1.6Moz @ 1.6g/t Au Mineral Resource on granted mining leases
02
THREE OPEN PITS UNDERPIN LIFE-OF-MINE PRODUCTION
~1Moz @ 1.4g/t Au in three open pits
▸+70% of total Goldfields Project gold production delivered from three open pits mines
▸Each pit carries a 2–3 year mine life with extension upside
▸Mining commences at Lord Byron in late CY26
▸Lord Byron is co-located with Fish, where camp and support infrastructure is already in place
GOLDFIELDS HUB REGIONAL MAP
1.Refer ASX announcement ‘EPC Contractor Engaged for Goldfields Project’ dated 17/02/2026
2.Refer ASX announcement ‘Strategic Drill & Blast Agreement executed with Aquirian’ dated 16/04/2026
3.Refer to Appendices 2-4 for Mineral Resource estimates and Ore Reserve statement.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
01
SIMPLIFIED BUSINESS MODEL
Staged open pit and underground operations
▸Operating model:One open pit providing base-load, one underground mine delivering high-grade
▸Brightstar-owned processing infrastructure–captures full portfolio value through a hub-and-spoke
operating model
▸5+ years of owner-operator mining experience underpins a step change in gold production
03
DEVELOPMENT ACTIVITIES RAMPING UP
Processing plant site established and construction underway
▸170-person Lord Byron-Fish camp already in operation
▸ALLmine sources have previously been mined and processed –well understood operationally
▸GR Engineering appointed to mill construction
2
; drill & blast contract with AquirianLtd executed
3
▸Mill construction underway -first gold targeted in JunQ’27
10
Calendar Year20262027 QuarterMarQJunQSepQDecQMarQJunQSepQDecQ Studies & Funding Goldfields DFS 2.0 Funding Execution Final Investment Decision (FID) Approvals MDCP Plant Approval Works Approval Construction 170-person Camp upgrades 1.5Mtpa Processing Plant EPC Contract Power, Water & Site NPI Potential 2.5Mtpa Expansion Construction Mining Lord Byron Site Establishment Lord Byron Open Pit Mining Operations Fish Underground Mining Operations Yunndaga Underground Site Establishment Yunndaga Underground Mining Operations JULY2026 FIRST GOLD –JUNE 2027 BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer GOLDFIELDS PROJECT Gold pouring in less than 12 months First Gold targeted in June2027 11
PRE-TAX NPV₈
$606M
A$6,000/oz
PRE-TAX IRR
74%
NPV/Capex ratio 3.2x
LOM FREE CASH FLOW
~$1.0B
Over 6 years, undiscounted
AVERAGE ANNUAL FCF
$163M
Steady-state operations per annum
LOM GOLD PRODUCED
457koz
Over 6 years
AVERAGE PRODUCTION
2
~75koz p.a.
1.5Mtpa Processing Plant in Laverton
GROUP AISC
3
$2,998/oz
C1 cash cost $2,581/oz
PEAK FUNDING REQ.
3
$188M
Payback ~15 months
4
SENSITIVITY TO GOLD PRICE -A$/oz
METRIC (A$M)$5,500/oz$6,000/oz$6,500/oz$7,000/oz$7,500/oz
Pre-tax NPV₈($M)
5
4546067589111,063
Pre-tax IRR (%)
5
587490106121
Annual FCF ($M)126163200236273
LOM FCF ($M)7589771,1971,4171,637
1.Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026.
2.1.5Mtpa design capacity based on 100% fresh rock throughput; plant design has embedded optionality for expansion to 2.5Mtpa.
3.C1 cash cost includes mining opex, haulage, processing and G&A costs. AISC = C1 cash costs plus sustaining capital + royalties -both based on gold ounces produced at A$6,000/oz.
4.Payback period calculated from the first month of gold production after mill commissioning.
5.Pre-tax basis -as at31 December 2025, Brightstar had $209M of Group tax losses available.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
GOLDFIELDS PROJECT
DFS2.0economics demonstrates a robust development case
1
A high-margin, short-payback development with demonstrable mine life extension opportunities
12
Sandstone Gold Project Growing the size of the opportunity -a district-scale Tier-1 development in the making
- Refer to Appendix 3 for Sandstone Mineral Resource estimates. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer SANDSTONE GOLD PROJECT ¹ 2.9Moz @ 1.3g/t Au ▸Platform set for a significant, stand-alone WA gold development ▸Total footprint of~1,800km 2 of highly-endowed WA Greenstone Belt terrane ▸Mineral Resources located on granted Mining leases ▸PFS underway -evaluating large-scale central processing plant utilising existing plant site and infrastructure to fast-track approvals ▸July 2026 Interim MRE Update: 69Mt @ 1.3g/t Au for 2.9Moz Au ▸18% growth in total Sandstone MRE ▸+113% growth in Measured & Indicated classification (1.1Moz @ 1.5g/t Au) ▸~145,000m drilled under BTR ownership ▸Additional Mineral Resource update due DecQ’26 ▸Material exploration upside-Shallow Mineral Resource with limited historical systematic exploration history prior to Brightstar ▸No mining since 2010 (gold price was ~A$1,000/oz) and previous owners focus on oxide mineralisation due to processing limitations delivers logical in/near-deposit growth targets SANDSTONE PROJECT 2.9Moz Mineral Resource base –Underexplored and positioned for development Emerging district-scale WA gold development opportunity 14
Delivering a district-scale opportunity 01 Improve Resource Quality & Grow oTarget further upgrades to existing MRE of 2.9Moz @ 1.3g/t Au -DecQ’26 oTransition from >100km of infill drilling to extensional & greenfield targets 02 Convert Resourcesto Reserves oComprehensive technical work underpins a maiden Ore Reservein PFS oTargeting a long-life asset with a material production profile necessitates a meaningful Ore Reserve 03 Right-Size Processing Infrastructure oA large-scale processing plant creates the foundation for a district-scale, long-life production centre-unlocking ~1,800km² of prospective Greenstone Belt terrane 1.Refer to ASX announcement ‘Sandstone gold project accelerating towards development’ dated 30 April 2025 and ‘Strategic Plan to Unlock Sandstone” dated 27 January 2026. TWO-YEAR SANDSTONE STRATEGIC PLAN BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Alignment to Strategic Plan 1 •Long-Term Growth 1 : Multi-million-ounce MRE growth to support long-life operations. •PFS: Targeting 1 maiden Ore Reserve 2H’ Y26 that underpins a material WA gold development •DFS: Targeting 1 material uplift to PFS Ore Reserve from increased exploration spendand on-going mine optimisationwork. •Target: Apply Goldfields free cash flow & refinance debt to fund Sandstone into production 15 Calendar Year202620272028 Drilling Infill Drilling Growth & Greenfields Studies Geotechnical Testwork Metallurgical Testwork Processing Plant Pre Feasibility Study (PFS) Permitting & Approvals Definitive Feasibility Study (DFS) Execution Funding Final Investment Decision (FID) MRE Upgrade Pre-Feasibility Study Commence construction Sandstone Strategic Plan -Execution Roadmap MRE Upgrade Definitive Feasibility Study Final Investment Decision JULY 2026 MRE Upgrade
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Central Sandstone –Critical Mass for development pathway Existing Mineral Resource of 2.9Moz Au provides critical mass for PFS evaluation and future development CENTRAL SANDSTONE Critical mass from existing Mineral Resources underpins future development ▸Existing MRE of 2.9Moz @ 1.3g/t Au provides the platform for feasibility studies, permitting/approvals and progress towards development oSufficient scale: No more M&A or exploration success required for pathway to Sandstone development ▸Brightstar exploration strategy to date has focused on improving the quality of the Mineral Resource to de-risk future development oMaterial infill drilling programs enabled robust and conservative re-estimation of Mineral Resources. o1.1Moz @ 1.5g/t Au in Measured & Indicated classification oTotal Sandstone MRE increased to 2.9Moz Au (18% growth) GROWTH OUTCOME EXCEEDED EXPECTATIONS ▸Final PFS-infill programs focused on further keyexistingdeposits for growth: oBull Oak + Indomitable Camp + TMH-Shillington oThese three deposits host +1Moz in Inferred Resources –targeted for further material conversion into M&Ifor inclusion in the PFS ▸Exploration focus transitioningto growth as PFS workstreams advance SANDSTONE PROJECT 16
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Central Sandstone Growth Potential
Early-stage growth targets present opportunity for multi-million-ounce Mineral Resource growth potential and a unique development proposition in the region
CENTRAL SANDSTONE
Growth targets provide platform for ‘Tier 1 status’
▸Significant exploration potential for new discoveries and MRE growth
▸Brightstar’s exploration focus to transition to answering the question:
“How Big Could Sandstone Be?”
▸Pipeline of early stage greenfields opportunities provides ‘competition for capital’
within Brightstar with multiple compelling exploration targets across the group
▸Systematic testing and advancing these greenfields opportunities towards
maiden Mineral Resources and possible inclusion in future development studies
▸Brightstar has executed a deliberate focus on improving geological confidence and
resource classification rather than MRE growth to date.
▸In parallel with ongoing feasibility studies, the exploration strategy now enables
a sustained focus on growth opportunities to illustrate the scale of the
Sandstone gold camp
SANDSTONE PROJECT
17
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Montague –Shallow deposits provide potential for open pit developments High-grade mineralisation targeted for open pit mining and haulage to Sandstone processing MONTAGUE Limited exploration history provides the upside ▸New MRE of 664koz @ 1.3g/t Au ▸~70km from Sandstone by a well-established haul-road ▸Indicative haulage cost of A$15/t (or ~0.1g/t Au equivalent) to proposed Sandstone mill 1 ▸Higher grades indicates likely early inclusion in Sandstone mine schedule ▸Previous exploration history has been focused on the main deposits around the Montague Granodiorite ▸Compelling opportunities for growth to existing deposits and potential for new discoveries SANDSTONE PROJECT 18 1.Utilising a haulage cost of $0.21/tonne/km.
Brightstar's Market Position An unparalleled gold development opportunity at the junior end of the ASX -well placed to re-rate as a producer
TARGETING AN ASX MID-TIER GOLD PRODUCTION SCALE Limited mid-tier producers with scale of >200koz p.a. 22 24 77 96 100 104 124 144 155 168 192 285 329 337 373 379 050100150200250300350400 Annualised Production (kozp.a.)¹ TARGET200 puts BTR into Mid-Tier scale ▸Few other junior companies have a project pipeline that rivals Brightstar ▸Execution of TARGET200 strategy positions BTR alongside established mid-tier producers and could establish Brightstar as a TOP 10 AUSTRALIAN PRODUCER ▸De-risked re-rate opportunity maturing as major production growth strategy is delivered ▸Consistent recent theme of potential large-scale production and growth being acquired (De Grey Mining, Spartan Resources)
- Refer to Appendix 7 for references. Based on March or June 2026 Quarterly production run-ratesand FY26 actual production from published company disclosures –small variances may occur dur to rounding. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer MID-TIER OPPORTUNITY 1,543 715 Kaiser Reef Meeka Pantoro Black Cat Emerald Catalyst Capricorn Bellevue Ora Banda Alkane Ramelius Genesis Vault Westgold Regis Evolution Northern Star Greatland M&A has diminished the pipeline of emerging producers with +200koz p.a. production potential 20
DEMONSTRABLE VALUE-ADDING APPROACH IN GROWING MINERAL RESOURCES & ADVANCING ASSETS TO PRODUCTION A robust position to build a WA gold mining mid tier
- Refer to Appendix 8 for references. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 21 AZY: Minyari Dome BC8: Kal East/Coyote/Paulsens AUC: Katanning HRN: Gum Creek MRT: Kalgoorlie BTR: Goldfields/Sandstone MI6: Bullabulling STN: Apollo Hill AAR: Mandilla GG8: Nth Kalgoorlie / Vivien 1.5 2.5 3.5 4.5 5.5 6.5 0.00.51.01.52.02.53.03.54.0 Resource (Moz) Grade (g/t Au) ASX WA Gold Developers —Resource vs Grade (Bubble = Relative EV, A$M) 0.2Moz 0.5Moz 0.6Moz 1.0Moz 1.9Moz 0.3Moz 0.5Moz 0.9Moz 2.0Moz 2.6Moz 0.5Moz 1.0Moz 1.5Moz 3.0Moz 4.5Moz Jun-22Jun-23Jun-24Jun-25Jul-26 Brightstar's Global MRE Growth (Year-on-Year) M&IInferred A successful track record in M&A combined with aggressive exploration has placed Brightstar at the top end of the advanced developers and emerging producers with genuine multi-asset production scale potential
DEVELOPMENT & PRODUCTION COMPARABLE PEERS¹
Undemanding valuation on every resource and reserve metric
Goldfields &
Sandstone
Kalgoorlie &
Paulsens
Murchison
NorsemanDavyhurstPlutonicBullabullingKatanning
CORPORATE
2
Market Cap ($M)362663328
7772,1491,4981,374466
Enterprise Value ($M)200613278
5401,9181,3211,189368
Net Cash ($M)1635050
23723217718598
MINERAL RESOURCES
Resource (koz)4,4572,5241,235
4,6013,6903,4536,2002,443
Grade (g/t)1.43.03.0
3.32.03.11.01.1
Measured (koz)525755
37499--1,531
Indicated (koz)1,8731,269645
1,8981,7262,6924,400693
Inferred (koz)2,5321,199535
2,3271,8707591,700219
ORE RESERVES & STUDY
Mine TypeO/P & U/G³O/P & U/GO/P & U/G
O/P & U/GO/P & U/GO/P & U/GO/PO/P
Reserve (koz)351³330305
8596108612,5001,330
Grade (g/t)1.6³2.43.8
2.12.32.90.91.1
Plant Size (Mtpa)1.5³1.20.6
1.21.21.253.6
Production (koz/yr)75³9624
71155105--
VALUATION
EV/Production ($/oz)-6,40211,431
6,97812,36712,638--
EV/Resource ($/oz)45243225
117520383192151
EV/Reserve oz ($/oz)-1,859912
6293,1441,534475277
1.Refer to Appendices 6 for references.
2.As at14 July 2026 -sourced from S&P CapIQ.
3.Goldfields DFS 2.0 only.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Black Cat
Meeka Metals
PantoroGoldOra BandaCatalyst MetalsMinerals 260Ausgold
EMERGING PRODUCER PEERS
ESTABLISHED PRODUCER PEERS
EXPLORER / DEVELOPER PEERS
Brightstar
Resources
Limited
22
SUMMARY Platform set for sustained growth Advancing a multi-hub production growth -Tier-1 jurisdiction, +4.5Moz Au on granted Mining Licenses BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 01 GOLDFIELDS DEVELOPMENT ▸Simplified business model: 1x open pit & 1x underground + BTR-owned infrastructure ▸First gold targeted JunQ’27 ▸LOM Free Cash Flow $1.0B 1 over 6 years 02 SANDSTONE TO DELIVER SCALE ▸Multiple MRE upgrades due CY26 ▸PFS due late CY26 ▸DFS and FID due late CY27 / early CY28 ▸Targeting long-life, low cost “ ier 1 status” project 03 EXPERIENCED TEAM ▸Deep WA gold mine-building & operating experience ▸Proven project execution capability leveraging +5 years of owner-operate inhouse capability ▸GR Engineering appointed to construct Laverton plant 04 DRILL, DRILL, DRILL ▸+100,000m drilling programs planned CY26 –drilling transitions from infill to GROWTH ▸Exploration to target Resource growth and quality ▸4-6 rig drilling throughout CY26 05 CAPTURING VALUE ▸Undemanding Reserve / Production comparable metrics ▸Significant potential to re-rate as multi-mine developer line with producer peers ▸EV/Resource ~$45/oz vs peer median >$300/oz 06 COMMUNITY ENGAGEMENT ▸Strong Native Title, local Shires, pastoralist relationships ▸Advanced Native Title Agreement negotiations ▸ESG strategy aligned with responsible gold production 23
Appendices Montague Open Pit (Sandstone)
5
75
78
79
77
76
67
0
20
40
60
80
FY27FY28FY29FY30FY31FY32FY33
Gold (koz)
Group Production (koz)
1.Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026.
2.Diluted mined grade.
3.Gross revenue less royalties. Some variances may occur due to rounding.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Goldfields DFS 2.0UnitLavertonMenziesTotal
Key Production Outcomes²
Open Pit Mining
Orekt4,8933,0147,906
Grade²g/t Au1.41.61.5
Contained ounceskoz226150377
Operating Strip ratiow:o9.211.710.2
Underground Mining
Orekt8786351,513
Grade²g/t Au2.72.62.6
Contained ounceskoz7652128
Consolidated Operations
Orekt5,7713,6499,419
Grade²g/t Au1.61.71.7
Contained ounceskoz302203505
M&I contribution%69%80%73%
Processing
Ore processedkt9,4199,419
Feed grade²g/t Au1.71.7
Contained ounceskoz505505
Recovery%91%91%
Ounces producedkoz457457
$977m
AVERAGE GOLDFIELDS DFS 2.0 PRODUCTION
+75 koz p.a.
1.5Mtpa Laverton Plant
GOLDFIELDS PROJECT
+75koz p.a. from a consolidated Laverton processing strategy
1
Yielding ~$1.0B of pre-tax free cash flow² at A$6,000/oz over a six-year mine life
3
(400)
(200)
200 400 600 800 1,000 FY26FY27FY28FY29FY30FY31FY32FY33 Cash flow ( A$m ) Pre-tax Project FCF –(A$6,000/oz) Mining capexMining opexNet revenueCum. Free cash flow (pre-tax) 25
LAST 12 MONTHS
Transformative year sets platform for growth
JAN 2025 –MAR 2026
Laverton Production
▪384kt @ 2.2g/t Au for 24koz recovered via
OPA with Genesis Minerals
▪Generated over $95M of net proceeds
(after processing charges) to BTR reinvested
across portfolio
▪Maintained BTR’s owner-operator DNA in
readiness for broader Goldfields
development and production
1.Refer to Brightstar Resources ASX announcements, May 2025 -May 2026.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
26
DEC 2025
Sandstone Consolidation Complete
▪Completion of Aurumin acquisition completing
B ’s consolidation of the andstone region
▪Consolidated Mineral Resource Estimate of
2.4Moz @ 1.5g/t
▪Announced the two-year Sandstone
Strategic Planwhich plans to capture full
value from potential Tier 1 asset
JAN 2026
Goldfields DFS 2.0
▪Compelling economics: A$606m NPV
8
74% IRRA$1.0bn LOM FCF @ A$6,000/oz
▪New 1.5Mtpa CIL plant to be built south of
Laverton
▪First gold targeted JunQCY27
FEB –MAR 2026
Fully Funded for Development
▪Strategic equity raise: A$193m via placement and
oversubscribed SPP
▪Debt funding secured: US$120m Bond
▪Goldfields fully funded to first gold: +A$350m
liquidity to build Goldfields
▪Sandstone funded to FID: Parallel advancement of
growth drilling and PFS/DFS
MAY 2026 +
Goldfields Execution
▪Early works underway including initial site
works and processing plant long lead orders
▪Key development partners appointed with
GR Engineering processing plant EPC
▪FID declared in May 2026 with
construction underway
LAVERTON MINE
Lord Byron Open Pit
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Oblique view of the Lord Byron open
pit design with Mineral Resource
block model (coloured by grade)
Recent exploration at Lord Byron
(looking NW) with existing Lord Byron
open pits in the background
LORD BYRON OPEN PIT
JORC Mineral Resource of 5.4Mt @ 1.5g/t Au for 267koz Au
1
Fully approved for mining operations to commence
Two small historic open pits coalesce into one, large open pit mine
2.5 year mine lifebased on current open pit mining inventory
Mining to commence DecQ’26
Processing physicals and costs
2
:
•Mining 2.5Mt @ 1.4g/t Au for 112koz Au mined
•92koz Au recovered(82% recovery)
•Average operating strip ratio of 8:1
•C1 Cash Cost: $2,491/oz
•AISC Cost: $2,878/oz
3
Ore Reserves: 1.8Mt @ 1.4g/t Au for 83koz
4
ocated ~50km from Brightstar’s processing facility along established haul
routes
Open down dip and along strike to the South –near term drilling focused on
shallow mine life extensions to the South
Targeting commencement of mining operations and stockpiling from DecQ’26
in advance of Brightstar’s processing plant commissioning
1.Refer to Appendix 2 for Goldfields Mineral Resources.
2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026.
3.Assumes A$6,000/oz.
4.Refer to Appendix 4 for Ore Reserve statement.
27
LAVERTON MINE Cork Tree Well Open Pit BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer CORK TREE WELL OPEN PIT JORC Mineral Resource of 6.5Mt @ 1.4g/t Au for 292koz Au 1 Mining to commence 2030 2.5 year mine lifebased on current open pit design Processing physicals and costs 2 : •Mining 2.4Mt @ 1.5g/t Au for 114koz Au mined •108koz Au recovered (95% recovery) •Average operating strip ratio of 10:1 •C1 Cash Cost: $2,411/oz •AISC Cost: $2,813/oz 3 Ore Reserves: 2.1Mt @ 1.5g/t Au for 104koz 4 Open at depth and along strike -significant exploration upside to grow Resources on underexplored tenure ocated ~75km from Brightstar’s processing facility along established haul routes Oblique view of the Cork Tree Well open pit designs with Mineral Resource block model (coloured by grade) Aerial view of historic CTW open pits (looking south) 1.Refer to Appendix 2 for Goldfields Mineral Resources. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Assumes A$6,000/oz. 4.Refer to Appendix 4 for Ore Reserve statement. 28
MENZIES MINE Lady Shenton Open Pit BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LADY SHENTON OPEN PIT JORC Mineral Resource of 8.1Mt @ 1.4g/t Au for 352koz Au 1 Fully approved for mining operations to commence Mining to commence 2H’CY28 ~3 year mine lifebased on current open pit mining inventory On-going exploration to assess potential for underground operations following open pit mining Processing physicals and costs 2 : •Mining 2.7Mt @ 1.5g/t Au for 132koz Au mined •121koz Au recovered(91% recovery) •Average operating strip ratio of 11:1 •C1 Cash Cost: $2,959/oz •AISC Cost: $3,516/oz 3 Ore Reserves: 2.4Mt @ 1.5g/t Au for 117koz 4 Open at depth and along strike -significant exploration upside to grow Mineral Resources on underexplored tenure 1.Refer to Appendix 2 for Goldfields Mineral Resources. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Assumes A$6,000/oz. 4.Refer to Appendix 4 for Ore Reserve statement. Oblique view of the Lady Shenton open pit designs with Mineral Resource block model (coloured by grade) Aerial view into the historic Lady Shenton open pit (looking south) 29
MENZIES MINE YunndagaUnderground BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer YUNNDAGA UNDERGROUND et to be Brightstar’s next underground mine JORC Mineral Resource of 3.1Mt @ 2.1g/t Au for 206koz Au 1 (inclusive of lower grade halo) Mining to commence SepQ’27 Significant advantage utilising existing underground equipment, infrastructure and personnel from current underground operations 2 year mine lifebased on current underground mining plan Processing physicals and costs 2 : •Mining 0.6Mt @ 2.6g/t Au for 52koz mined •50koz Au recovered(~92% recovery) •C1 Cash Cost: $3,291/oz •AISC Cost: $3,441/oz 3 Ore Reserves: 0.5Mt @ 2.7 g/t Au for 47koz 4 Open at depth with significant scope for Mineral Resource growth and mine life extension Standard WA underground open stope, retreat mining methodology utilising conventional underground mining equipment Oblique view of the Yunndaga underground mine design with Mineral Resource block model (coloured by grade) Aerial view into the historic Yunndaga open pit (looking north) 1.Refer to Appendix 2 for Goldfields Mineral Resources. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Assumes A$6,000/oz. 4.Refer to Appendix 4 for Ore Reserve statement. 30
Comparable transactions for Western Australian pre-production gold assets -acquisition cost, A$/ounce BTR TransactionNon-BTR Transaction BTR M&A Weighted Average¹: A$45/oz Non-BTR M&A Average: A$179/oz Note 1: Weighted average based on all BTR M&A transactions. Refer to Appendix 5 for details on transaction multiples. MineralResource estimates presented above are standalone target Mineral Resources (not proforma). 29 / 35 BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer APPENDIX Appendix 1: Brightstar’s Impressive M&A Track Record 867664642568 253 219 207 204 176 160 125 93 88 80 7373 71 68 66 64 62 56 48 42 41 31 24 16 0 200 400 Feb-25Mar-25May-25Feb-20Feb-26Jun-21Dec-24Jul-23Jun-23May-25Nov-20Feb-25Dec-23Jul-25Jan-25Apr-24Dec-25Mar-24Jan-23May-25Jul-25May-20Dec-21Aug-24Mar-23Mar-23Aug-24Dec-22 EV / Resource ounce (A$/oz) Target Acquiror Enterprise Value (A$M) Mineral Resource (koz) Feb-25Mar-25May-25Feb-20Feb-26Jun-21Dec-24Jul-23Jun-23May-25Nov-20Feb-25Dec-23Jul-25Jan-25Apr-24Dec-25Mar-24Jan-23May-25Jul-25May-20Dec-21Aug-24Mar-23Mar-23Aug-24Dec-22 Matsa Resources Spartan Resources Gold Road Spectrum Metals Magnetic Resources Firefly Resources De Grey Mining Musgrave Minerals Strickland Minerals Old Highway Project NTM Gold Maximus Resources Kin Mining Warriedar Resources Bulla- bulling Project Hobbes Project Mt Henry- Selene Gold Linden Gold Vango Mining Laverton (Focus) Project Aurumin Alt Resources Bardoc Gold Alto Metals Lady Ida Project Breaker Resources Montague East Project Kingwest Resources AngloGold Ramelius Resources Gold Fields Ramelius Resources Genesis Minerals Gascoyne Resources Northern Star Ramelius Resources Northern Star Catalyst Metals Dacian Gold Astral Resources Genesis Minerals Capricorn Metals Minerals 260 Northern Star Alicanto Minerals Brightstar Resources Catalyst Metals Genesis Minerals Brightstar Resources AurenneSt Barbara Brightstar Resources Beacon Minerals Ramelius Resources Brightstar Resources Brightstar Resources 8122,0942,600202606432,8151896133853154164167136524662505932146441353128 9363,1524,0503562,40019613,5849273462066793356102,0502,3001779153511,0023,9009515713,0731,0463181,684507505 31
Appendix 2: Goldfields Mineral Resources BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LAVERTONCut-offMeasuredIndicatedInferredTotal g/t Auktg/t Aukozktg/t Aukozktg/t Aukozktg/t Aukoz Alpha0.5---3711.9221,0282.8921,3992.5115 Beta0.53451.7195761.6299611.7541,8821.7102 Cork Tree Well0.5---3,2641.61663,1981.21266,4621.4292 Lord Byron0.53111.7172,1041.51052,9741.51455,3891.5267 Fish1.6255.441994.5291533.2163764.049 Gilt Key0.5---152.211531.361681.38 Second Fortune (UG)2.52415.3123413.7153411.7139213.440 Total –Laverton7052.3526,5631.73678,5011.745215,7681.7873 MENZIESCut-offMeasuredIndicatedInferredTotal g/t Auktg/t Aukozktg/t Aukozktg/t Aukozktg/t Aukoz Lady Shenton System0.5/1.2---3,7251.41684,3491.31848,0741.4352 Yunndaga0.5/1.2---2,1722.21529231.8543,0952.1206 Aspacia0.5---1371.771,2381.6621,3751.670 Lady Harriet System0.5---5201.3225901.1211,1101.2243 Link Zone0.5---1601.377401.0238901.09 Selkirk0.5---306.361401.251702.112 Lady Irene0.5------1001.761001.76 Total –Menzies---6,7441.73628,0801.435514,8141.5718 This Presentation contains references to Brightstar’s JORC Mineral Resources, extracted from the ASX announcements titled “Maiden Link Zone Mineral Resource Estimate –Amended” dated 15 November 2023, “Cork Tree Mineral Resource Upgrade Delivers 1Moz GroupMRE” dated 23 June 2023 and “Auralia Review” dated 10 September 2020, and ASX announcements for KingwestResources Limited titled, "High grade drilling results and high grade resource estimation from the Menzies Goldfield” dated 13 December 2022, "Menzies JORC gold resources surpass 500,000 ounces" dated 26 April 2022, “Robust Mineral Resource upgrades at Laverton and Menzies ahead of DFS delivery underpins future mining operations” dated 19 May 2025, “Menzies Mineral Resources Increases 22% to 0.7Moz” dated 11 December 2025 and “Drilling results and Mineral Resource upgrade at Lord Byron” dated 1 January 2026. This Presentation contains references to Linden’s JORC (2012) Mineral Resources, as reported in the announcement released by Brightstar on 25 March 2024 titled “Brightstar makes Recommended Takeover Offer for Linden Gold Alliance Limited”. APPENDIX 32
Appendix 3: Sandstone Mineral Resources BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LocationCut-offMeasuredIndicatedInferredTotal g/t Auktg/t Aukozktg/t Aukozktg/t Aukozktg/t AuKoz Montague-Evermore0.4---1,6832.11143,1221.31274,8051.6241 Whistler0.4---1,2582.0795651.4251,8231.8105 Achilles / Airport0.4---2,1301.3904,2551.01346,3851.1224 Duplex0.4------1,0030.9301,0030.930 Julias (Attributable)0.4---1,2581.2495560.8151,8141.164 Lord Nelson0.4---4,4411.52151,7581.1646,1991.4279 Lord Henry0.4---1,5231.6768831.4402,4061.5116 Vanguard Camp0.4---1,6162.21152,1941.3903,8091.7205 Havilah Camp0.4------1,3591.2541,3591.254 Indomitable Camp0.4---2,0991.2818,7721.028410,8711.0366 Bull Oak0.4/0.8---1,4810.9449,0561.027810,5371.0322 Two Mile Hill / Shillington0.4/0.73---4,6731.31909,9011.754114,5741.6731 McIntyre0.4---5131.220770.925891.223 Plum Pudding0.4---4981.017520.915501.018 Central Trend (Eureka, Wirraminna, Old Town, Twin Shafts, Goat Farm, McClaren) 0.5---1,4801.1531,1311.1392,6121.191 Total ---24,6521.51,14444,6841.21,72569,3371.32,868 This Presentation contains references to Brightstar’s JORC Mineral Resources, extracted from the ASX announcements titled “Brightstar to drive consolidation of Sandstone Gold District” dated 1 August 2024, “Scheme Booklet Registered by ASIC” dated14October 2024, “Brightstar Pursues Synergistic Consolidation at Sandstone” dated 21 July 2025 , “Scheme Booklet Registered by ASIC” dated 9 October 2025 and “Sandstone MineralResource Grows to 2.9Moz” dated 15 July 2026. APPENDIX 33
Appendix 4: Ore Reserves BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LocationProvedProbableTotal Goldfields Ore Reserves 1 ktg/t Aukozktg/t Aukozktg/t Aukoz Cork Tree Well Open Pit (Laverton)---2,1371.51042,1371.5104 Lord Byron Open Pit (Laverton)3081.6151,5301.4681,8381.483 Lady Shenton Open Pit (Menzies)---2,3951.51172,3951.5117 Yunndaga Underground (Menzies)---5392.7475392.747 Total3081.6156,6011.63356,9091.6351 The references in this presentation to Brightstar’s Ore Reserve estimates were reported in accordance with Listing Rule 5.9 in the following announcements: (a): “Maiden Underground Ore Reserves Underpins FY26 Production” dated 26 June 2025, (b)“Menzies andLaverton Gold Project Feasibility Study” dated 30 June 2025 and (c) “Updated Goldfields Feasibility Study” dated 29 January 2026”, Brightstar confirms that the material assumptions and technical parameters disclosed in the announcement continue to apply and have not materially changed. Brightstar confirms that it is not aware of any new information or data that materially affects the information included in the previous market announcements and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. APPENDIX 34
Appendix 5: Comparable Transaction Data BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer AcquirorTargetProject StageAnn. Date Enterprise Value¹ Mineral Resource Resource Multiple Source Information A$mkoz Au.A$/oz Au.DateASX Release Title RameliusResourcesSpartan ResourcesResource DevelopmentMar-252,0943,15266417-Mar-25 Transformation Combination of Ramelius& Spartan RameliusResourcesSpectrum MetalsResource DevelopmentFeb-2020235656910-Feb-20 Ramelius Makes Recommended Takeover Offer for Spectrum Metals Gascoyne ResourcesFirefly ResourcesResource DevelopmentNov-214319621816-Jun-21 Merger of Gascoyne Resources and Firefly Resources Northern StarDe Grey MiningDFSDec-242,81513,5842072-Dec-24 Northern Star agrees to acquire De Grey Ramelius ResourcesMusgrave MineralsPre-Feasibility StudyJul-231899272043-Jul-23 Recommended Takeover Offer for Musgrave Minerals Ltd Northern StarStrickland MineralsResource DevelopmentJun-236134617626-Jun-23 Sale of Millrose Project for $61m to Northern Star Resources Catalyst MetalsOld Highway ProjectResource DevelopmentMay-25332061588-May-25 Catalyst acquires Old Highway gold deposit Dacian GoldNTM GoldResource DevelopmentNov-208567915216-Nov-20 Strategic Merger of Dacian Gold and NTM Gold Astral ResourcesMaximus ResourcesResource DevelopmentFeb-2531335923-Feb-25 Astral Resources and Maximus Resources to Merge via Recommended Takeover Offer Genesis MineralsKin MiningResource DevelopmentDec-23546108814-Dec-23 Reporting on select Kin Mining gold projects 14/1/23 AngloGoldMatsa ResourcesFeasibility StudyFeb-258129368727-Feb-25 Matsaand AngloGold Ashanti Execute A$101 Million Deal Lake Carey Gold Project Minerals 260Bullabulling ProjectResource DevelopmentJan-251672,3007214-Jan-25 Transformational acquisition of the 2.3Moz BullabullingGold Project in WA, one of Australia's largest undeveloped gold projects Northern StarHobbes ProjectResource DevelopmentApr-2413177719-Apr-24 Sale of Hobbes Exploration Licence for $1.5M Brightstar ResourcesAuruminResource DevelopmentJul-25599516218-Jul-25 Strategic Acquisition of Aurumin Consolidates Sandstone Brightstar ResourcesLinden GoldResource DevelopmentMar-24243516825-Mar-24 Brightstar makes recommended takeover offer for Linden Gold Alliance Limited Catalyst MetalsVango MiningDFSJan-23661,0026610-Jan-23 Bidders Statement -Catalyst Recommended Takeover for Vango Genesis MineralsLaverton (Focus) ProjectResource DevelopmentMay-252503,9006326-May-25 Acquisition of the Laverton Gold Project AurenneAlt ResourcesPre-Feasibility StudyAug-2023571567-May-20 Alt Receives All Cash Off Market Bid from Private Equity Firm AurenneGroup (7 May 2020); Mt Ida and Bottle Creek Resource Upgrade Brings Total Resource to 571,300 Ounces Gold (2 Apr 2020) St BarbaraBardoc GoldOptimisation StudyDec-211463,0734820-Dec-21 St Barbara to acquire BardocGold via Recommended Scheme of Arrangement Brightstar ResourcesAlto MetalsResource DevelopmentAug-24441,046421-Aug-24 Brightstar to drive consolidation of Sandstone district Beacon MineralsLady Ida ProjectPre-Feasibility StudyMar-23133183924-Mar-23 Beacon Acquires Lady Ida Project Ramelius ResourcesBreaker ResourcesResource DevelopmentMar-23531,6843220-Mar-23 Ramelius Makes Recommended Takeover Offer for Breaker Res NL Brightstar ResourcesMontague East ProjectResource DevelopmentAug-2412507241-Aug-24 Brightstar to drive consolidation of Sandstone district Brightstar ResourcesKingwest ResourcesResource DevelopmentDec-2285051623-Dec-22 Brightstar and Kingwest Resources agree strategic merger to unlock significant potential value for shareholders Genesis MineralsMagnetic ResourcesDFSFeb-26606.32,40025316-Feb-26 Presentation -Magnetic Attraction Gold FieldsGold RoadProductionMay-252,6004,0506425-May-25 Gold Fields enters into binding agreement to acquire Gold Road Resources and withdrawal of cautionary announcement Capricorn MetalsWarriedar ResourcesResource DevelopmentJul-251642,0508024-Jul-25 Capricorn Metals to acquire WarriedarResources AlicantoMinerals LimitedMt Henry-Selene GoldResource DevelopmentDec-2564.69157117-Dec-25 Mt Henry-Selene Gold Divested for $64.6M 1.Enterprise values sourced CapIQon the date of the transaction announcement APPENDIX 35
Appendix 6: Peer Mineral Resource References¹ BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer TickerCompanyStage Proved (koz) Probable (koz) Total Reserve (koz) Grade (g/t) Plant Capacity (Mtpa) Production (koz/year) Source & Date Market Cap ($M) Enterprise Value ($M) EV/ Resource ($/oz) EV/ Reserve ($/oz) EV/ Production ($/oz) BTRBrightstar ResourcesOperations & DFS153353511.61.523 Quarterly Activities/Appendix 5B Cash Flow Report (29 April 2026) 362200455698,863 BC8Black Cat SyndicateOperations143173302.41.296Quarterly Activities & Appendix 5B (23 Apr 2026)6636132431,8596,402 MEKMeeka MetalsOperationsN/aN/a3053.80.624 Quarterly Activities/Appendix 5B Cash Flow Report (29 April 2026) 32827822591211,431 PNRPantoro GoldOperations1796808592.11.271Quarterly Activities/Appendix 5B (28 Apr 2026)7775401176296,978 OBMOra BandaOperations495606102.31.2155 March 2026 Quarterly Activities Report (16 Apr 2026) Annual Mineral Resource and Ore Reserve Statement (14 July 2026) 2,1491,9185203,14412,367 CYLCatalyst MetalsOperations08618612.91.2105March 2026 Quarterly Activities Report (29 Apr 2026)1,4981,3213831,53412,638 MI6Minerals260PFS02,5002,5000.950 March 2026 Quarterly Activities & Cashflow Report (28 Apr 2026) Bullabulling PFS Confirms High-Margin, Large-Scale Gold Mine (8 July 2026) 1,3741,189192475- AUCAusgoldDFS1,1062241,3301.13.60Quarterly Activities/Appendix 5B (20 Apr 2026)466368151277- CodeCompanyStageMeasured (koz)Indicated (koz)Inferred (koz)Total resourceGrade (g/t)Source Date BTRBrightstar ResourcesOperations & DFS52 1,8732,5324,4571.4Sandstone Mineral Resource Grows To 2.9Moz15-Jul-26 BC8Black Cat SyndicateOperations571,2691,1992,5243.0Trojan and Imperial Resources Increase to 286koz29-Jun-26 MEKMeeka MetalsOperations556455351,2353.0TurnberryMineral Resource Upgrade6-May-24 PNRPantoroGoldOperations3741,8982,3274,6013.3Annual Mineral Resource and Ore Reserve Statement22-Sep-25 OBMOra BandaOperations 991,7261,8703,6902.0Annual Mineral Resource and Ore Reserve Statement14-Jul-26 CYLCatalyst MetalsOperations02,6927593,4533.1 Putting meat on the bones of Catalyst's path to 200,000oz annual gold production 4-Aug-25 MI6Minerals260PFS0 4,4001,7006,2001.0Bullabulling Resource Increases to 6.2Moz8-Jul-26 AUCAusgoldDFS1,5316932192,4431.1Updated Definitive feasibility Study Presentation19-Dec-25 1.Market capitalisations and enterprise values as at14 July 2026 and March 2026 Quarterly cash and debt balances APPENDIX 36
Appendix 7: Peer AnnualisedProduction References¹ BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer APPENDIX 1.Annualised production based on March 2026 Quarterly production run-rate and FY26 actual production from published company disclosures –small variances may occur dur to rounding. TickerCompany Annualised Production (kozp.a.) Source & Date NSTNorthern Star Resources1,543Production Update (2 July 2026) EVNEvolution Mining715June 2026 Quarterly Report (15 July 2026) RRL Regis Resources379379koz Produced, Top End of Guidance Achieved (6 July 2026) WGXWestgold373March 2026 Quarterly Results (29 Apr 2026) VAUVault Minerals337Trading Update (3 July 2026) GGPGreatland Resources329June 2026 Quarter Production Update (2 July 2026) GMDGenesis Minerals 285Business Update (3 July 2026) RMSRamelius Resources1922026 June Quarter Update (8 July 2026) ALKAlkane Resources168Production in Top Half of FY2026 Guidance (8 July 2026) OBMOra Banda155March 2026 Quarterly Activities Report (16 Apr 2026) BGLBellevue Gold144Strong quarter beats midpoint of guidance (7 July 2026) CMMCapricorn Metals124Top End of FY26 Guidance Delivered at KGP (6 July 2026) CYLCatalyst Metals104FY26 Production Update (3 July 2026) EMREmerald Resources100June 2026 Quarter Production Update (2 July 2026) BC8Black Cat Syndicate96Quarterly Activities & Appendix 5B (23 Apr 2026) PNRPantoro Gold77FY2026 Result and FY2027 Guidance (9 July 2026) MEKMeeka Metals24Quarterly Activities/Appendix 5B Cash Flow Report(29 April 2026) KAUKaiser Reef22Quarterly Activities/Appendix 5B Cash Flow Report (29 April 2026) 37
Appendix 8: Peer WA Gold Developers –Resource vs Grade¹ BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer APPENDIX 38 TickerCompanyTotal Resource (koz) Grade (g/t) Source & Date Enterprise Value ($M) EV/ Resource ($/oz) MI6Minerals2606,2001.0 March 2026 Quarterly Activities & Cashflow Report (28 Apr 2026) Bullabulling PFS Confirms High-Margin, Large-Scale Gold Mine (8 July 2026) 1,189192 AZYAntipa Minerals2,9001.3Quarterly Activities/Appendix 5B Cash Flow Report (28 Apr 2026)350121 STNSaturn Metals2,8300.5 Apollo Hill Gold Resource Jumps by 590,000 Ounces to 2.83 Million Ounces (3 Jun 2026) 22278 BC8Black Cat Syndicate2,5243.0Quarterly Activities & Appendix 5B (23 Apr 2026)613243 AUCAusgold2,4431.1Quarterly Activities/Appendix 5B (20 Apr 2026)368151 HRNHorizon Gold2,3001.9Gum Creek Project Gold Resource Update (4 Nov 2025)18179 AARAstral Resources2,0721.0 Mineral Resource Increased to 2.07 Million Ounces –Mandilla Now at 1.74 Million Ounces Gold (21 Apr 2026) 13866 MRTMaritana Minerals1,8781.7Quarterly Activities Report 31 March 2026 (29 Apr 2026)212113 GG8Gorilla Gold Mines1,5003.8Quarterly Activities/Appendix 5B Cash Flow Report (28 April 2026)286190 1.Market capitalisations and enterprise values as at14 July 2026 and March 2026 Quarterly cash and debt balances
BRIGHTSTAR RESOURCES LIMITED Building a Multi-Asset Western Australian Gold Producer Fully funded developer with a Tier-1 growth asset in the Go Bay ASX : BTR INVESTOR PRESENTATION · MAY 2026
Important Notices & Disclaimers Important Notices •Thispresentation(Presentation)hasbeenpreparedbyBrightstarandhasbeenauthorisedforreleasebytheBoardofDirectorsofBrightstaronthebasisitistobereadinconjunctionwiththeseimportantnoticesanddisclaimers. •ThisPresentationdated6May2026hasbeenpreparedbythemanagementofBrightstarResourcesLimited(ACN100727491)(“B ”,“Brightstar”or“ ompany”). Disclaimer •ThisPresentationhasbeenpreparedbyBrightstarbasedoninformationfromitsownandthird-partysourcesandisnotadisclosuredocument.NopartyotherthanBrightstarhasauthorisedorcausedtheissue,lodgement,submission, despatchorprovisionofthisPresentation,ortakesanyresponsibilityfor,ormakesorpurportstomakeanystatements,representationsorundertakingsinthisPresentation.Exceptforanyliabilitythatcannotbeexcludedbylaw,Brightstar anditsrespectiverelatedbodiescorporate,directors,employees,advisersandagentsdisclaimandacceptnoresponsibilityorliabilityforanyexpenses,losses,damagesorcostsincurredbyanypartyrelatinginanywaytothisPresentation including,reliancewithoutlimitation,theinformationcontainedinorprovidedinconnectionwithit,anyerrorsoromissionsfromithowevercaused,lackofaccuracy,completeness,currencyorreliabilityoryouoranyotherpersonplacinganyon thisPresentation,itsaccuracy,completeness,currencyorreliability. •ThisPresentationisnotaprospectus,disclosuredocumentorotherofferingdocumentunderAustralianlaworunderanyotherlaw.Itisprovidedforinformationpurposesandisnotaninvitationnorofferofsharesorrecommendationfor subscription,purchaseorsaleinanyjurisdiction.ThisPresentationdoesnotpurporttocontainalltheinformationthataprospectiveinvestormayrequireinconnectionwithanypotentialinvestmentinBrightstar.Eachrecipientmust makeitsownindependentassessmentofBrightstarbeforemakinganinvestmentdecision. Forward-Looking Statements •ThisPresentationcontainscertain"forward-lookingstatements".Thewords"expect","anticipate","estimate","intend","believe","guidance","should","could","may","will","predict","plan"andothersimilarexpressionsareintendedtoidentify forward-lookingstatements.Indicationsof,andguidanceon,futurefinancialpositionorperformancearealsoforward-lookingstatements.Forward-lookingstatements,opinionsandestimatesprovidedinthisPresentationarebasedon assumptionsandcontingencieswhicharesubjecttochangewithoutnoticeandinvolveknownandunknownrisksandcertaintiesandotherfactorswhicharebeyondthecontrolofBrightstaranditsdirectorsandmanagement.Forward-looking statementsareprovidedasageneralguideonlyandshouldnotberelieduponasanindicationorguaranteeoffutureperformance.Actualresults,performanceorachievementsmaydiffermateriallyfromthoseexpressedorimpliedinsuch statementsandanyprojectionsandassumptiononwhichthesestatementsarebased.ThesestatementsmayassumethesuccessofBrightstarbusinessstrategies.Thesuccessofanyofthosestrategieswillberealisedintheperiodforwhich theforward-lookingstatementmayhavebeenpreparedorotherwise.Readersarecautionednottoplaceunduerelianceonforward-lookingstatements,particularlyinlightofthecurrenteconomicclimateandthesignificantvolatility,andexcept asrequiredbylaworregulation,noneofBrightstarortheirrespectiverepresentativesoradvisersassumesanyobligationtoupdatetheseforward-lookingstatements.Norepresentationorwarranty,expressorimplied,ismadeastothe accuracy,likelihoodofachievementorreasonablenessofanyforecasts,prospects,orstatementsinrelationtofuturematterscontainedinthisPresentation.Theforward-lookingstatementsarebasedoninformationavailabletoBrightstarasat thedateofthisPresentation.Exceptasrequiredbylaworregulation(includingtheASXListingRules),noneofBrightstarandtheirrespectiverepresentativesoradvisersundertakesanyobligationtoprovideanyadditionalorupdatedinformation whetherasaresultofachangeinexpectationsorassumptions,newinformation,futureevents,orresultsorotherwise.Indicationsof,andguidanceoroutlookonfuturefinancialpositionorperformancearealsoforward-lookingstatements. Aspirational Statements •ThestatementswhichmayappearinthisPresentationregardingtheaspirationsforBrightstartoundertakeconstructionofaSandstoneprocessingplantin2H’ Y27forfirstgoldproductionin2H’ Y28,aligningwithcontinuedplannedproduction growthfromBrightstar’sLavertonandMenzieshubstoaspirationallytargetGroupproductionprofileof+200kozp.a.by2029,areaspirationalstatements.ThesestatementsarenotproductiontargetsasBrightstardoesnotyethavesufficient objectivereasonablegroundstobelievethatthestatementscanbeachieved. •Importantly,thestatementsareconsideredaspirationalbecause,asdisclosedinitsASXannouncementdated30April2025titled‘ andstonegoldprojectacceleratingtowardsdevelopment’(April2025Announcement),Brightstarhasnotyet completedapre-feasibilitystudyforSandstone,notingthatSandstonehasalongoperatinghistorywithdetailedinformationavailableonhistoricalperformanceacrossthemajorityofdeposits,oremineralisationstylesandoperatingparameters (i.e.openpitminingandconventionalcarbon-in-leachprocessingconductedintherecentpast).Whilepreliminaryassessmentshavebeenundertaken,asdisclosedintheApril2025Announcement,substantialfurtherworkisrequiredbefore BrightstarwillbeinapositiontohavesufficientobjectivereasonablegroundstopublishproductiontargetsorforecastfinancialinformationrelatingtotheSandstoneProject. •Thestudywillneedtoconsideranumberofvariablesandfocusareaswhichareexpectedtoinclude,butarenotlimitedtoitemswithinthefollowingfeasibilitystudyworkstreams:preparingrobustupdateMineralResourceEstimatesforeach depositbasedongeologicalmodelsgeneratedbyexistingandnewgeologicalinformationinformedbyBrightstar’scurrentdrillingprograms;applyingcurrent(CY26)miningcostandoperationalparameterstodelineateeconomicmining optimisations,openpitminedesignsandschedulesthatencapsulatesgeotechnicalandmetallurgicalrecoveryinformationfromthirdpartytestwork;assessmentsintoapprovalsandpermittingprocesses,alongwithdetailedengineeringdesign work,optimalprocessingflowsheetsandrequisiteinfrastructurethatdeliversthebestoutcomeofrecoveredmetal,operatingcostsandcapitalcostswhichsupportstheseaspirations. •BrightstarconfirmsthattheinclusionofAspirationalStatementsinthispresentationarebasedentirelyontheAprilAnnouncementandcontainsnonewinformation. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 2
Important Notices & Disclaimers Not Investment Advice •EachrecipientofthePresentationshouldmakeitsownenquiriesandinvestigationsregardingallinformationinthisPresentationincludingbutnotlimitedtotheassumptions,uncertaintiesandcontingencieswhichmayaffectfutureoperationsof Brightstarandtheimpactthatdifferentfutureoutcomesmighthave.InformationinthisPresentationisnotintendedtoberelieduponasadvicetoinvestorsorpotentialinvestorsandhasbeenpreparedwithouttakingaccountofanyperson’s individualinvestmentobjectives,financialsituationorparticularneeds.Beforemakinganinvestmentdecision,prospectiveinvestorsshouldconsidertheappropriatenessoftheinformationhavingregardtotheirowninvestmentobjectives, financialsituationandneedsandseeklegal,accountingandtaxationadviceappropriatetotheirjurisdiction.Brightstararenotlicensedtoprovidefinancialproductadviceinrespectoftheirsecurities. Feasibility Study -Cautionary Statement Goldfields ProjectFeasibility Study •The production targets and forecast financial information disclosed in this presentation were first announced in accordance withA X isting ules 5.16 and 5.17 in the ompany’s announcement ‘ pdated Goldfields Feasibility tudy” dated 29 January 2026. •Unless otherwise stated, the Company confirms that all material assumptions underpinning the production targets and forecast financial information derived from the production targets in the original DFS release 1 continue to apply and have not materially changed. •The Company cautions that a portion of the production target (27%) is based on Inferred Mineral Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production targets themselves will be realised. Production Target •The Production Target (and forecast financial information derived from the Production Target) referred to in this announcement is underpinned by Measured and Indicated Mineral Resources of approximately 73% and Inferred Mineral Resources of approximately 27% over the DFS period. •The total Life of Mine Production Target includes 27% Inferred Resources, 3% Indicated Resource outside of Reserve and the remaining 70% is underpinned by Proven and Probable Ore Reserves. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the Production Target itself (or the forecast financial information) will be realised. Competent Persons Statements •The Mineral Resources and Ore Reserves estimates disclosed in this Presentation were first disclosed in accordance with ASX Listing Rules 5.8 and 5.9 in the announcements as cross-referenced. Brightstar confirms that it is not aware of any new information or data that materially affects the information included in the relevant announcement and that all material assumptions and technical parameters underpinning the estimates in the previous announcements continue to apply and have not materially changed. Currency •Unlessotherwisestated,alldollarvaluesinthisPresentationarereportedinAustraliandollars. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 3
INVESTMENT HIGHLIGHTS Fully funded gold developer executing on major production growth Two large-scale production centresto unlock Brightstar's TARGET200 strategy¹
- Refer to the Aspirational Statements disclaimer on page 2.
- Refer to Appendices 2-4 for Mineral Resource estimates and Ore Reserve statement.
- Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026.
- Assuming A$6,000/oz. Financial metrics are presented on a pre-tax basis -as at31 December 2025, Brightstar had $209M of Group tax losses which are anticipated to be utilisedfor minimisingultimate tax expense.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
MAJOR PRODUCTION GROWTH ACROSS TWO WA PROJECTS²
•+4.0Moz Mineral Resources & 351koz Ore Reserves on granted Mining Leases
•Immediate production growth at Goldfields with Sandstone to deliver scale
•Targeting to be a Top 10 Australian producer
01
COMPELLING NEAR-TERM GOLDFIELDS DEVELOPMENT³
•A$193M equity & US$120M debt raised FULLY FUNDING Goldfields development
•6-year plan averaging 75koz p.a.
•New 1.5Mtpa CIL plant upgradeable to 2.5Mtpa
•First gold targeted JunQ'27
02
GOLDFIELDS HUB -MATERIAL FREE CASH FLOW³⁴
•Pre-tax NPV $606M | Pre-tax IRR 74% | Average FCF $163M p.a.
•LOM AISC $2,998/oz
•Cash generation from Goldfields to contribute to Sandstone FID 03 SANDSTONE -POTENTIAL TIER-1 WA DEVELOPMENT² •2 Year Strategic Plan to deliver distinct scale, long-life production centre •Shallow, under-explored district-scale opportunity with MRE of 2.4Moz @ 1.5g/t Au •+120,000m drilled to date;+100,000m budgeted for CY26 •Fully funded to DFS and FID 04 4
TARGET200 STRATEGY Two projects, one target -a clear path to TARGET200 ¹ Advancing production growth across Goldfields and Sandstone Hubs -unlocking Brightstar's 4.0Moz Mineral Resource base 01 GOLDFIELDS DEVELOPMENT 2 Near-term production growth ▸+75koz p.a. of production over an initial 6 years ▸First gold production targeted in JunQ'27 ▸1.5Mtpa CIL plant upgradeable to 2.5Mtpa to future-proof Goldfieldsupside ▸Robust LOM FCF generation of ~$1.0 billion ▸GR Engineering Services appointed to construct a new 1.5Mtpa Laverton plant ▸Long lead orders placed and site establishment underway 1.Refer to the Cautionary Statement on page 3 regarding production targets and forecast financial information and Aspirational Statements disclaimer on page 2. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Refer to ASX announcement ‘Sandstone gold project accelerating towards development’ dated 30 April 2025. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 02 SANDSTONE PROJECT 3 Material scale & upside -long-term value ▸Current MRE: 2.4Moz @ 1.5g/t Au ▸1.6Moz located in the top 150m from surface ▸Two MRE updates planned across CY26 –JunQ’26 and ecQ’26 ▸ andstone PF targeted for 2H’ Y26 ▸Evaluating a large-scale central processing facility ▸FID targeted from late CY27; targeted production from CY29
50 100 150 200 FY27FY28FY29FY30FY31FY32FY33 Gold Production ( koz ) PRODUCTION GROWTH STRATEGY 1,2,3 Goldfields DFS 2.0 TARGET200 •Goldfieldsproduction provides the base production rate ~75koz p.a. • andstone F targeted from ecQ’27 •Aspirational production from 2029 •Target: Two production centres leveraging 4.0Moz in Mineral Resource TARGET200: Two Western Australian production centresleveraging 4.0Moz in Mineral Resources Average Goldfields DFS 2.0 Production: +75koz p.a. 5
CORPORATE SNAPSHOT
Team & funding in place –platform for major production growth
BOARD OF DIRECTORS
Richard Crookes
Non-Executive Chairman
Alex Rovira
Managing Director
Andrew Rich
Executive Director -
Operations
Jonathan Downes
Non-Executive Director
RESEARCH COVERAGE
1.Refer to cash based as atMarch 2026 per Quarterly Activities/Appendix 5B Cash Flow Report (29 April 2026) plus Feb-Mar '26 gross capital raising less Ocean Partners facility balance debt. Share price as at1 May2026. Monthly liquidity based on last six trading months sourced from IRESS.
Please see Research notes available on Brightstar Website for Disclaimers and Disclosures.
-
Includes gross Bond proceeds converted at 0.72 AUD/USD.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer HNW/Retail 40% Institutional 46% S tr ategics& M ining Industry 12% B o a r d/M a n a g e m e n t 2% SHARE PRICE $0.40 (AUD) As at1 May2026 TOTAL LIQUIDITY¹ $329M Net Cash + drawable Bond MARKET CAP $439M 1,097M shares on issue ENTERPRISE VALUE $277M EV / Resource $69/oz NET CASH $163M As per arQ’26 quarterly MINERAL RESOURCES 4.0Moz 82Mt at 1.5g/t Au UNDRAWN BOND US$120M Nordic Bond AVG MONTHLY LIQUIDITY ~$80M 6-month average liquidity
5 10 15 20 25 30 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 Oct-23Dec-23Feb-24Apr-24Jun-24Aug-24Oct-24Dec-24Feb-25Apr-25Jun-25Aug-25Oct-25Dec-25Feb-26Apr-26 Volume (m shares) Share Price ($/share) VolumeClose Price SHARE PRICE PERFORMANCE SHAREHOLDERS 6
Goldfields Project Executing on a fully funded pathway to +75koz p.a. –First gold JunQ’27
GOLDFIELDS PROJECT
De-risked development pathway -simple open-pit & underground mining
A new 1.5Mtpa processing plant to unlock existing Mineral Resource of 1.6Moz @ 1.6g/t Au
1
on granted mining leases
02
THREE OPEN PITS UNDERPIN LIFE-OF-MINE PRODUCTION
~1Moz @ 1.4g/t Au in three open pits with infrastructure advantage
▸Three open pits -each with 2-3 year mine life –all with extension upside
▸+70% of total Goldfields Project gold production coming from these three open pits developments
▸First open pit -Lord Byron to commence mining late CY26
▸Lord Byron is co-located with Fish where capital is already sunk on camp and support infrastructure
GOLDFIELDS HUB REGIONAL MAP
1.Refer ASX announcement ‘EPC Contractor Engaged for Goldfields Project’ dated 17/02/2026
2.Refer ASX announcement ‘Strategic Drill & Blast Agreement executed with Aquirian’ dated 16/04/2026
3.Refer to Appendices 2-4 for Mineral Resource estimates and Ore Reserve statement.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
01
SIMPLIFIED BUSINESS MODEL
Staged open pit and underground operations
▸Operating model:1x open pit mine (base load) and 1x underground as high-grade feed
▸Brightstar owned processing infrastructure–full operational control of value chain with no third party
milling to maximisefinancial outcomes
▸Leveraging +5 years of owner-operate mining capability to deliver step change in gold production
03
DEVELOPMENT ACTIVITIES RAMPING UP
Site established -operations ready to go
▸170-man Lord Byron-Fish camp already in operation
▸ALLmine sources have previously been mined and processed –well understood operationally
▸GR Engineering appointed to mill construction
2
; drill & blast contract with AquirianLtd executed
3
▸Site establishment works underway; first gold targeted in JunQ’27
8
PRE-TAX NPV₈
$606M
A$6,000/oz
PRE-TAX IRR
74%
NPV/Capex ratio 3.2x
LOM FREE CASH FLOW
~$1.0B
Over 6 years, undiscounted
AVERAGE ANNUAL FCF
$163M
Steady-state operations per annum
LOM GOLD PRODUCED
457koz
Over 6 years
AVERAGE PRODUCTION
2
~75koz p.a.
1.5Mtpa Processing Plant in Laverton
GROUP AISC
3
$2,998/oz
C1 cash cost $2,581/oz
PEAK FUNDING REQ.
3
$188M
Payback ~15 months
4
SENSITIVITY TO GOLD PRICE -A$/oz
METRIC (A$M)$5,500/oz$6,000/oz$6,500/oz$7,000/oz$7,500/oz
Pre-tax NPV₈($M)
5
4546067589111,063
Pre-tax IRR (%)
5
587490106121
Annual FCF ($M)126163200236273
LOM FCF ($M)7589771,1971,4171,637
1.Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026.
2.1.5Mtpa design capacity based on 100% fresh rock throughput; plant design has embedded optionality for expansion to 2.5Mtpa.
3.C1 cash cost includes mining opex, haulage, processing and G&A costs. AISC = C1 cash costs plus sustaining capital + royalties -both based on gold ounces produced at A$6,000/oz.
4.Payback period calculated from the first month of gold production after mill commissioning.
5.Pre-tax basis -as at31 December 2025, Brightstar had $209M of Group tax losses available.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
GOLDFIELDS PROJECT
DFS 2.0 economics demonstrates a robust development case
1
A high-margin, short-payback development with demonstrable mine life extension opportunities
9
FID –JunQ’26 FIRST GOLD –JunQ’27 BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Calendar Year2026202720282029203020312032 Quarter / HalfQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q41H2H1H2H1H2H1H 2H Studies & Funding Goldfields DFS 2.0 Funding Execution Final Investment Decision (FID) Approvals MDCP Plant Approval Works Approval Process Plant Plant Construction Steady state operations Mining Lord Byron Open Pit Fish Underground YunndagaUnderground Lady Shenton Open Pit Alpha Underground Cork Tree Well Open Pit GOLDFIELDS PROJECT Goldfieldsexecution timeline First Gold targeted in JunQ’27 10
GR Engineering appointed to construct 1.5Mtpa Laverton Plant 1 Fixed-price EPC contract de-risks the construction phase, with embedded capacity to cost-effectively expand to 2.5Mtpa during operations ▸Conventional 1.5Mtpa CIL processing plant with embedded engineering design for expansion to 2.5Mtpa during operations ▸EPC Early Works Agreement with GR Engineering executed; long lead- time orders awarded to de-risk development schedule ▸Lump-sum, fixed-price EPC delivery model selected for construction of new processing infrastructure ▸Preferred gas-fired power pathway delivers de-risked energy source ▸LOM average processing cost of A$31/t processed 2 ▸Plant design based on consolidated metallurgical parameters across all mine sites -delivering LOM average recoveries of 91% 2 ▸Site establishment underway to enable commencement of plant construction in JunQ’26 INITIAL CAPACITY 1.5Mtpa Delivering 75koz p.a. EXPANSION UPSIDE 2.5Mtpa Pre-engineered for upside optionality LOM RECOVERY 91% Recovering 457koz Au over 6 yr LOM 1.Refer ASX announcement “GR Engineering appointed as Preferred Contractor –Laverton Processing Plant’ dated 17 February 2026. 2.Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Laverton Processing Plant –1.5Mtpa design render GOLDFIELDS PROJECT LOM UNIT COST $31/t Per tonneprocessed 11
5
75
78
79
77
76
67
0
20
40
60
80
FY27FY28FY29FY30FY31FY32FY33
Gold (koz)
Group Production (koz)
1.Refer ASX announcement 'Updated Goldfields Feasibility Study' dated 29 January 2026.
2.Diluted mined grade.
3.Gross revenue less royalties. Some variances may occur due to rounding.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Goldfields DFS 2.0UnitLavertonMenziesTotal
Key Production Outcomes²
Open Pit Mining
Orekt4,8933,0147,906
Grade²g/t Au1.41.61.5
Contained ounceskoz226150377
Operating Strip ratiow:o9.211.710.2
Underground Mining
Orekt8786351,513
Grade²g/t Au2.72.62.6
Contained ounceskoz7652128
Consolidated Operations
Orekt5,7713,6499,419
Grade²g/t Au1.61.71.7
Contained ounceskoz302203505
M&I contribution%69%80%73%
Processing
Ore processedkt9,4199,419
Feed grade²g/t Au1.71.7
Contained ounceskoz505505
Recovery%91%91%
Ounces producedkoz457457
$977m
AVERAGE GOLDFIELDS DFS 2.0 PRODUCTION
+75 koz p.a.
1.5Mtpa Laverton Plant
GOLDFIELDS PROJECT
+75koz p.a. from a consolidated Laverton processing strategy
1
Yielding ~$1.0B of pre-tax free cash flow² at A$6,000/oz over a six-year mine life
3
(400)
(200)
200 400 600 800 1,000 FY26FY27FY28FY29FY30FY31FY32FY33 Cash flow ( A$m ) Pre-tax Project FCF –(A$6,000/oz) Mining capexMining opexNet revenueCum. Free cash flow (pre-tax) 12
Sandstone Gold Project Growing the size of the opportunity -a district-scale Tier-1 development in the making
- Refer to Appendix 3 for Sandstone Mineral Resource estimates. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer SANDSTONE GOLD PROJECT ¹ 2.4Moz @ 1.5g/t Au ▸Platform set for a significant, stand-alone WA gold development ▸Total footprint of ~1,800km 2 of highly-endowed WA Greenstone Belt terrane ▸Mineral Resources located on granted Mining leases ▸Mining, processing and supplementary infrastructure in place -material benefits for de-risked development ▸PFS underway -evaluating large-scale central processing plant utilising existing plant site and infrastructure to fast-track approvals ▸Targeting FID at Sandstone from late CY27 ▸Material exploration upside-Shallow Mineral Resource with limited historical systematic exploration ▸~120,000m drilled under BTR ownership + >100,000m budget in CY26 ▸Targeting material MRE upgrades in CY26; 4-6 rig drilling throughout CY26 1.6Moz located in the top 150m from surface SANDSTONE PROJECT 2.4Moz Mineral Resource base –Underexplored and positioned for development Emerging district-scale WA gold development opportunity 14
1.Refer to Appendix 3 for Sandstone Mineral Resource estimates. 2.Endowment includes historical production of +1.3Moz of historical production (refer ASX announcement ‘BTR-AME Sandstone Merger &Acquisition Presentation’ dated 1 August 2024) and existing Mineral Resources of 2.4Moz Au. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer How big is Sandstone? A long-mined district with a 2.4Moz current MRE 1 and an estimated total endowment of +4Moz 2 –lack of modern systematic exploration history SANDSTONE PROJECT 150m below surface 15
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Central Sandstone –Critical Mass for development pathway Existing Mineral Resources (and 2x CY26 Mineral Resource upgrades) provide critical mass for PFS evaluation and processing plantengineering CENTRAL SANDSTONE Critical mass from existing Mineral Resources underpins future development ▸Existing MRE of 2.4Moz @ 1.5g/t Au provides the platform for feasibility studies, permitting/approvals and progress towards development oSufficient scale: No more M&A or exploration success required for pathway to Sandstone development ▸Brightstar exploration to date has focused on improving the quality of the dataset to de-risk future development oMaterial infill drilling programs to enable complete re-estimation of all Mineral Resources oDiamond drilling to provide metallurgical, geotechnical and structural information to improve orebody knowledge ▸Exploration focus to transition to growth in JunQ’26 as PFS workstreams advance ▸No mining since 2010 (gold price was ~A$1,000/oz) and previous owners focus on oxide mineralisation due to processing limitations delivers logical in/near-deposit growth targets ▸Key existingdeposits for growth: Bull Oak, Indomitable Camp, TMH-Shillington SANDSTONE PROJECT 16
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Central Sandstone growth potential
Early-stage growth targets present opportunity for multi-million ounceMineral Resource growth potential and a unique development proposition in the region
CENTRAL SANDSTONE
Growth targets provide platform for ‘Tier 1 status’
▸Significant exploration potential for new discoveries and MRE growth
oTargeting of prospective early-stage targets underway in CY26 and CY27
▸Brightstar’s exploration focus to transition to answering the question:
“How Big Could Sandstone Be?”
▸Pipeline of early stage greenfields opportunities provides ‘competition for capital’
within Brightstar with multiple compelling exploration targets across the group
▸Systematic testing and advancing these greenfields opportunities towards
maiden Mineral Resources and possible inclusion in future development studies
▸Recent aircore drilling delivered
1
material greenfield exploration success:
▸24m @ 3.97g/t Au from 48m (SSAC25199)
▸100m @ 0.51g/t Au from 12m (SSAC25134)
▸Key early-stage prospects for growth:
Indomitable North, Bollinger, HancocksCamp, Lords Corridor, Bulletin
SANDSTONE PROJECT
- Refer ASX announcement Material early-stage aircoredrilling success at Sandstone' dated 28 January 2026.
17
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Montague –Shallow deposits provide potential for open pit developments High-grade mineralisation targeted for open pit mining and haulage to Sandstone processing MONTAGUE Limited exploration history ▸70km from Sandstone by a well-established haul-road ▸Higher grades indicates likely early inclusion in Sandstone mine schedule ▸Previous exploration history has been focused on the main deposits around the Montague Granodiorite(combined MRE 449koz @ 1.7g/t Au) ▸Compelling opportunities for growth to existing deposits and potential for new discoveries ▸Existing depositstargeted for growth: Achilles, Julias ▸Early-stage prospects targeted for growth: Duplex, Eastern Contact, Mort Rock, Ray Charles SANDSTONE PROJECT 18
Delivering a district-scale opportunity 01 Improve Resource Quality & Grow oTarget upgrades to existing 2.4Moz @ 1.5g/t Au Resource (across two MRE updates in CY26) oTransition from >100km of infill drilling to extensional & greenfield targets 02 Convert Resource to Reserve oComprehensive technical work underpins a maiden Ore Reserve in PFS oShallow resources well positioned for large-scale open pit mining with 1.6Moz in the top 150m 03 Right-Size Processing Infrastructure oA large-scale processing plant creates the foundation for a district-scale, long-life production centre-unlocking ~1,800km² of prospective Greenstone Belt terrane 1.Refer to ASX announcement ‘Sandstone gold project accelerating towards development’ dated 30 April 2025 and ‘Strategic Plan to Unlock Sandstone” dated 27 January 2026. TWO-YEAR SANDSTONE STRATEGIC PLAN Calendar Year202620272028 Drilling Infill Drilling Growth & Greenfields Studies Geotechnical Testwork Metallurgical Testwork Processing Plant Pre Feasibility Study (PFS) Permitting & Approvals Definitive Feasibility Study (DFS) Execution Funding Final Investment Decision (FID) MRE Upgrade MRE Upgrade MRE Upgrade Definitive Feas Study Pre-Feas Study Commence construction FID Execution Roadmap BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer Alignment to Strategic Plan 1 •Long-Term Growth 1 : Multi-million ounceMRE growth to support long-life operations. •PFS: Targeting 1 maiden re eserve 2H’ Y26, leveraging 1.6Moz in top 150m. •DFS: Targeting 1 material uplift to PFS Ore Reserve from increased exploration spend. •Target: Apply Goldfields free cash & debt to fund Sandstone to production. 19
Brightstar's Market Position An unparalleled gold development opportunity at the junior end of the ASX -well placed to re-rate as a producer
TARGETING AN ASX MID-TIER GOLD PRODUCTION SCALE Limited mid-tier producers with scale of >200koz p.a. 22 24 71 96 105 105 121 152 155 163 183 270 314 331 362 373 050100150200250300350400 AnnualisedProduction (kozp.a.)¹ TARGET200 puts BTR into Mid-Tier scale ▸Few other junior companies have a project pipeline that rivals Brightstar ▸Execution of TARGET200 strategy positions BTR alongside established mid-tier producers and could establish Brightstar as a TOP 10 AUSTRALIAN PRODUCER ▸De-risked re-rate opportunity maturing as major production growth strategy is delivered ▸Consistent theme of potential large- scale production and growth being acquired (De Grey Mining, Spartan Resources)
- Annualisedproduction based on March 2026 Quarterly production run-rate from published company disclosures. Refer to Appendix 7 for references. BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer MID-TIER OPPORTUNITY 1,500 680 Kaiser Reef Meeka Pantoro Black Cat Catalyst Emerald Capricorn Ramelius Ora Banda Bellevue Alkane Genesis Greatland Regis Westgold Evolution Northern Star Vault M&A has diminished the pipeline of emerging producers with +200koz p.a. production potential 21
DEVELOPMENT & PRODUCTION COMPARABLE PEERS¹
Undemanding valuation on every resource and reserve metric
Goldfields &
Sandstone
Kalgoorlie &
Paulsens
MurchisonJaurdiiNorsemanDavyhurstPlutonicBullabullingKatanning
CORPORATE
2
Market Cap ($M)4398314273411,2862,7271,4741,698515
Enterprise Value ($M)2777813773021,0482,4951,2971,513417
Net Cash ($M)16350503923723217718598
MINERAL RESOURCES
Resource (koz)4,0302,4881,2357994,6013,3103,4534,5002,443
Grade (g/t)1.52.93.01.23.32.03.11.01.1
Measured (koz)5257559637464--1,531
Indicated (koz)1,2671,2806452201,8981,6342,6923,000693
Inferred (koz)2,6511,1525354842,3271,6987591,500219
ORE RESERVES & STUDY
Mine TypeO/P & U/G³O/P & U/GO/P & U/GO/PO/P & U/GO/P & U/GO/P & U/GO/PO/P
Reserve (koz)351³330305247859236861-1,330
Grade (g/t)1.6³2.43.81.22.12.42.9-1.1
Plant Size (Mtpa)1.5³1.20.611.21.21.2-3.6
Production (koz/yr)75³1006526105148105-121
VALUATION
EV/Production ($/oz)-8,15215,49613,94914,75916,09212,414--
EV/Resource ($/oz)69314305378228754376336171
EV/Reserve oz ($/oz)7882,3671,2361,2241,22010,5731,507-314
1.Refer to Appendices 6 for references.
2.As at29April 2026 -sourced from S&P CapIQ.
3.Goldfields DFS 2.0 only.
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Black Cat
Syndicate
Meeka MetalsBeacon MineralsPantoroGoldOra BandaCatalyst MetalsMinerals 260Ausgold
EMERGING PRODUCER PEERS
ESTABLISHED PRODUCER PEERS
EXPLORER / DEVELOPER PEERS
Brightstar
Resources
Limited
22
SUMMARY Platform set for sustained growth Advancing a multi-hub production growth -Tier-1 jurisdiction, +4.0Moz Au on granted Mining Licenses BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer 01 GOLDFIELDS DEVELOPMENT ▸Simplified business model: 1x open pit & 1x underground + BTR-owned infrastructure ▸First gold targeted JunQ’27 ▸LOM Free Cash Flow $1.0B 1 over 6 years 02 SANDSTONE TO DELIVER SCALE ▸Multiple MRE upgrades due CY26 ▸PFS due late CY26 ▸DFS and FID due late CY27 / early CY28 ▸Targeting long-life, low cost “ ier 1 status” project 03 EXPERIENCED TEAM ▸Deep WA gold mine-building & operating experience ▸Proven project execution capability leveraging +5 years of owner-operate inhouse capability ▸GR Engineering appointed to construct Laverton plant 04 DRILL, DRILL, DRILL ▸+100,000m drilling programs planned CY26 –drilling transitions from infill to GROWTH ▸Exploration to target Resource growth and quality ▸4-6 rig drilling throughout CY26 05 CAPTURING VALUE ▸Undemanding Reserve / Production comparable metrics ▸Significant potential to re-rate as multi-mine developer line with producer peers ▸EV/Resource ~$66/oz vs peer median >$300/oz 06 COMMUNITY ENGAGEMENT ▸Strong Native Title, local Shires, pastoralist relationships ▸Advanced Native Title Agreement negotiations ▸ESG strategy aligned with responsible gold production 23
Appendices Montague Open Pit (Sandstone)
LAVERTON MINE
Lord Byron Open Pit
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Oblique view of the Lord Byron open
pit design with Mineral Resource
block model (coloured by grade)
Recent exploration at Lord Byron
(looking NW) with existing Lord Byron
open pits in the background
LORD BYRON OPEN PIT
JORC Mineral Resource of 5.4Mt @ 1.5g/t Au for 267koz Au
1
Fully approved for mining operations to commence
Two small historic open pits coalesce into one, large open pit mine
2.5 year mine lifebased on current open pit mining inventory
Mining to commence DecQ’26
Processing physicals and costs
2
:
•Mining 2.5Mt @ 1.4g/t Au for 112koz Au mined
•92koz Au recovered(82% recovery)
•Average operating strip ratio of 8:1
•C1 Cash Cost: $2,491/oz
•AISC Cost: $2,878/oz
3
Ore Reserves: 1.8Mt @ 1.4g/t Au for 83koz
4
ocated ~50km from Brightstar’s processing facility along established haul
routes
Open down dip and along strike to the South –near term drilling focused on
shallow mine life extensions to the South
Targeting commencement of mining operations and stockpiling from DecQ’26
in advance of Brightstar’s processing plant commissioning
1.Refer to Appendix 2 for Goldfields Mineral Resources.
2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026.
3.Assumes A$6,000/oz.
4.Refer to Appendix 4 for Ore Reserve statement.
25
LAVERTON MINE Cork Tree Well Open Pit BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer CORK TREE WELL OPEN PIT JORC Mineral Resource of 6.5Mt @ 1.4g/t Au for 292koz Au 1 Mining to commence 2030 2.5 year mine lifebased on current open pit design Processing physicals and costs 2 : •Mining 2.4Mt @ 1.5g/t Au for 114koz Au mined •108koz Au recovered (95% recovery) •Average operating strip ratio of 10:1 •C1 Cash Cost: $2,411/oz •AISC Cost: $2,813/oz 3 Ore Reserves: 2.1Mt @ 1.5g/t Au for 104koz 4 Open at depth and along strike -significant exploration upside to grow Resources on underexplored tenure ocated ~75km from Brightstar’s processing facility along established haul routes Oblique view of the Cork Tree Well open pit designs with Mineral Resource block model (coloured by grade) Aerial view of historic CTW open pits (looking south) 1.Refer to Appendix 2 for Goldfields Mineral Resources. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Assumes A$6,000/oz. 4.Refer to Appendix 4 for Ore Reserve statement. 26
MENZIES MINE Lady Shenton Open Pit BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LADY SHENTON OPEN PIT JORC Mineral Resource of 8.1Mt @ 1.4g/t Au for 352koz Au 1 Fully approved for mining operations to commence Mining to commence 2H’CY28 ~3 year mine lifebased on current open pit mining inventory On-going exploration to assess potential for underground operations following open pit mining Processing physicals and costs 2 : •Mining 2.7Mt @ 1.5g/t Au for 132koz Au mined •121koz Au recovered(91% recovery) •Average operating strip ratio of 11:1 •C1 Cash Cost: $2,959/oz •AISC Cost: $3,516/oz 3 Ore Reserves: 2.4Mt @ 1.5g/t Au for 117koz 4 Open at depth and along strike -significant exploration upside to grow Mineral Resources on underexplored tenure 1.Refer to Appendix 2 for Goldfields Mineral Resources. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Assumes A$6,000/oz. 4.Refer to Appendix 4 for Ore Reserve statement. Oblique view of the Lady Shenton open pit designs with Mineral Resource block model (coloured by grade) Aerial view into the historic Lady Shenton open pit (looking south) 27
MENZIES MINE YunndagaUnderground BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer YUNNDAGA UNDERGROUND et to be Brightstar’s next underground mine JORC Mineral Resource of 3.1Mt @ 2.1g/t Au for 206koz Au 1 (inclusive of lower grade halo) Mining to commence SepQ’27 Significant advantage utilising existing underground equipment, infrastructure and personnel from current underground operations 2 year mine lifebased on current underground mining plan Processing physicals and costs 2 : •Mining 0.6Mt @ 2.6g/t Au for 52koz mined •50koz Au recovered(~92% recovery) •C1 Cash Cost: $3,291/oz •AISC Cost: $3,441/oz 3 Ore Reserves: 0.5Mt @ 2.7 g/t Au for 47koz 4 Open at depth with significant scope for Mineral Resource growth and mine life extension Standard WA underground open stope, retreat mining methodology utilising conventional underground mining equipment Oblique view of the Yunndaga underground mine design with Mineral Resource block model (coloured by grade) Aerial view into the historic Yunndaga open pit (looking north) 1.Refer to Appendix 2 for Goldfields Mineral Resources. 2.Refer ASX announcement ‘Updated Goldfields Feasibility Study” dated 29 January 2026. 3.Assumes A$6,000/oz. 4.Refer to Appendix 4 for Ore Reserve statement. 28
Comparable transactions for Western Australian pre-production gold assets -acquisition cost, A$/ounce BTR TransactionNon-BTR Transaction BTR M&A Weighted Average¹: A$45/oz Non-BTR M&A Average: A$179/oz Note 1: Weighted average based on all BTR M&A transactions. Refer to Appendix 5 for details on transaction multiples. MineralResource estimates presented above are standalone target Mineral Resources (not proforma). 29 / 35 BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer APPENDIX Appendix 1: Brightstar’s Impressive M&A Track Record 867664642568 253 219 207 204 176 160 125 93 88 80 7373 71 68 66 64 62 56 48 42 41 31 24 16 0 200 400 Feb-25Mar-25May-25Feb-20Feb-26Jun-21Dec-24Jul-23Jun-23May-25Nov-20Feb-25Dec-23Jul-25Jan-25Apr-24Dec-25Mar-24Jan-23May-25Jul-25May-20Dec-21Aug-24Mar-23Mar-23Aug-24Dec-22 EV / Resource ounce (A$/oz) Target Acquiror Enterprise Value (A$M) Mineral Resource (koz) Feb-25Mar-25May-25Feb-20Feb-26Jun-21Dec-24Jul-23Jun-23May-25Nov-20Feb-25Dec-23Jul-25Jan-25Apr-24Dec-25Mar-24Jan-23May-25Jul-25May-20Dec-21Aug-24Mar-23Mar-23Aug-24Dec-22 Matsa Resources Spartan Resources Gold Road Spectrum Metals Magnetic Resources Firefly Resources De Grey Mining Musgrave Minerals Strickland Minerals Old Highway Project NTM Gold Maximus Resources Kin Mining Warriedar Resources Bulla- bulling Project Hobbes Project Mt Henry- Selene Gold Linden Gold Vango Mining Laverton (Focus) Project Aurumin Alt Resources Bardoc Gold Alto Metals Lady Ida Project Breaker Resources Montague East Project Kingwest Resources AngloGold Ramelius Resources Gold Fields Ramelius Resources Genesis Minerals Gascoyne Resources Northern Star Ramelius Resources Northern Star Catalyst Metals Dacian Gold Astral Resources Genesis Minerals Capricorn Metals Minerals 260 Northern Star Alicanto Minerals Brightstar Resources Catalyst Metals Genesis Minerals Brightstar Resources AurenneSt Barbara Brightstar Resources Beacon Minerals Ramelius Resources Brightstar Resources Brightstar Resources 8122,0942,600202606432,8151896133853154164167136524662505932146441353128 9363,1524,0503562,40019613,5849273462066793356102,0502,3001779153511,0023,9009515713,0731,0463181,684507505 29
Appendix 2: Goldfields Mineral Resources BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LAVERTONCut-offMeasuredIndicatedInferredTotal g/t Auktg/t Aukozktg/t Aukozktg/t Aukozktg/t Aukoz Alpha0.5---3711.9221,0282.8921,3992.5115 Beta0.53451.7195761.6299611.7541,8821.7102 Cork Tree Well0.5---3,2641.61663,1981.21266,4621.4292 Lord Byron0.53111.7172,1041.51052,9741.51455,3891.5267 Fish1.6255.441994.5291533.2163764.049 Gilt Key0.5---152.211531.361681.38 Second Fortune (UG)2.52415.3123413.7153411.7139213.440 Total –Laverton7052.3526,5631.73678,5011.745215,7681.7873 MENZIESCut-offMeasuredIndicatedInferredTotal g/t Auktg/t Aukozktg/t Aukozktg/t Aukozktg/t Aukoz Lady Shenton System0.5/1.2---3,7251.41684,3491.31848,0741.4352 Yunndaga0.5/1.2---2,1722.21529231.8543,0952.1206 Aspacia0.5---1371.771,2381.6621,3751.670 Lady Harriet System0.5---5201.3225901.1211,1101.2243 Link Zone0.5---1601.377401.0238901.09 Selkirk0.5---306.361401.251702.112 Lady Irene0.5------1001.761001.76 Total –Menzies---6,7441.73628,0801.435514,8141.5718 This Presentation contains references to Brightstar’s JORC Mineral Resources, extracted from the ASX announcements titled “Maiden Link Zone Mineral Resource Estimate –Amended” dated 15 November 2023, “Cork Tree Mineral Resource Upgrade Delivers 1Moz GroupMRE” dated 23 June 2023 and “Auralia Review” dated 10 September 2020, and ASX announcements for KingwestResources Limited titled, "High grade drilling results and high grade resource estimation from the Menzies Goldfield” dated 13 December 2022, "Menzies JORC gold resources surpass 500,000 ounces" dated 26 April 2022, “Robust Mineral Resource upgrades at Laverton and Menzies ahead of DFS delivery underpins future mining operations” dated 19 May 2025, “Menzies Mineral Resources Increases 22% to 0.7Moz” dated 11 December 2025 and “Drilling results and Mineral Resource upgrade at Lord Byron” dated 1 January 2026. This Presentation contains references to Linden’s JORC (2012) Mineral Resources, as reported in the announcement released by Brightstar on 25 March 2024 titled “Brightstar makes Recommended Takeover Offer for Linden Gold Alliance Limited”. APPENDIX 30
Appendix 3: Sandstone Mineral Resources
BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer
Location
Cut-
off
MeasuredIndicatedInferredTotal
g/t Auktg/t Aukozktg/t Aukozktg/t Aukozktg/t AuKoz
Montague-Boulder0.6---5224.0672,5561.2963,0781.7163
Whistler0.5------1,7042.21201,7042.2120
Evermore0.6------1,3191.6671,3191.667
Achilles Nth / Airport0.6---2212.0141,8471.4852,0681.599
Julias
1
(Attributable)0.6---------1,4311.358
Lord Nelson0.5---1,5002.11004,1001.41915,6001.6291
Lord Henry0.5---1,6261.5785701.1202,1971.498
Vanguard Camp0.5---4052.0263,3441.81913,7491.8217
Havilah Camp0.5------1,1711.4541,1711.454
Indomitable Camp0.5---8000.9237,4001.12738,2001.1296
Bull Oak0.5------2,4701.1902,4701.190
Two Mile Hill
0.5
/0.73
---1,7861.48211,1601.658212,9451.6664
Shillington0.5---1,3001.5616131.5301,9131.591
McIntyre0.5---4961.219670.925621.221
Plum Pudding0.5---3251.515881.244131.419
Central Trend (Eureka,Wirraminna, Old
Town, Twin Shafts, Goat Farm, McClaren)
0.5---1,4801.1531,1311.1392,6121.191
Total
---10,4611.653839,5401.51,84451,4321.52,439
This Presentation contains references to Brightstar’s JORC Mineral Resources, extracted from the ASX announcements titled “Brightstar to drive consolidation of Sandstone Gold District” dated 1 August 2024, “Scheme Booklet Registered by ASIC” dated14October 2024, “Brightstar Pursues Synergistic
Consolidation at Sandstone” dated 21 July 2025 and “Scheme Booklet Registered by ASIC” dated 9 October 2025.
APPENDIX
31
Appendix 4: Ore Reserves BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer LocationProvedProbableTotal Goldfields Ore Reserves 1 ktg/t Aukozktg/t Aukozktg/t Aukoz Cork Tree Well Open Pit (Laverton)---2,1371.51042,1371.5104 Lord Byron Open Pit (Laverton)3081.6151,5301.4681,8381.483 Lady Shenton Open Pit (Menzies)---2,3951.51172,3951.5117 Yunndaga Underground (Menzies)---5392.7475392.747 Total3081.6156,6011.63356,9091.6351 The references in this presentation to Brightstar’s Ore Reserve estimates were reported in accordance with Listing Rule 5.9 in the following announcements: (a): “Maiden Underground Ore Reserves Underpins FY26 Production” dated 26 June 2025, (b)“Menzies andLaverton Gold Project Feasibility Study” dated 30 June 2025 and (c) “Updated Goldfields Feasibility Study” dated 29 January 2026”, Brightstar confirms that the material assumptions and technical parameters disclosed in the announcement continue to apply and have not materially changed. Brightstar confirms that it is not aware of any new information or data that materially affects the information included in the previous market announcements and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. APPENDIX 32
Appendix 5: Comparable Transaction Data BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer AcquirorTargetProject StageAnn. Date Enterprise Value¹ Mineral Resource Resource Multiple Source Information A$mkoz Au.A$/oz Au.DateASX Release Title RameliusResourcesSpartan ResourcesResource DevelopmentMar-252,0943,15266417-Mar-25 Transformation Combination of Ramelius& Spartan RameliusResourcesSpectrum MetalsResource DevelopmentFeb-2020235656910-Feb-20 Ramelius Makes Recommended Takeover Offer for Spectrum Metals Gascoyne ResourcesFirefly ResourcesResource DevelopmentNov-214319621816-Jun-21 Merger of Gascoyne Resources and Firefly Resources Northern StarDe Grey MiningDFSDec-242,81513,5842072-Dec-24 Northern Star agrees to acquire De Grey Ramelius ResourcesMusgrave MineralsPre-Feasibility StudyJul-231899272043-Jul-23 Recommended Takeover Offer for Musgrave Minerals Ltd Northern StarStrickland MineralsResource DevelopmentJun-236134617626-Jun-23 Sale of Millrose Project for $61m to Northern Star Resources Catalyst MetalsOld Highway ProjectResource DevelopmentMay-25332061588-May-25 Catalyst acquires Old Highway gold deposit Dacian GoldNTM GoldResource DevelopmentNov-208567915216-Nov-20 Strategic Merger of Dacian Gold and NTM Gold Astral ResourcesMaximus ResourcesResource DevelopmentFeb-2531335923-Feb-25 Astral Resources and Maximus Resources to Merge via Recommended Takeover Offer Genesis MineralsKin MiningResource DevelopmentDec-23546108814-Dec-23 Reporting on select Kin Mining gold projects 14/1/23 AngloGoldMatsa ResourcesFeasibility StudyFeb-258129368727-Feb-25 Matsaand AngloGold Ashanti Execute A$101 Million Deal Lake Carey Gold Project Minerals 260Bullabulling ProjectResource DevelopmentJan-251672,3007214-Jan-25 Transformational acquisition of the 2.3Moz BullabullingGold Project in WA, one of Australia's largest undeveloped gold projects Northern StarHobbes ProjectResource DevelopmentApr-2413177719-Apr-24 Sale of Hobbes Exploration Licence for $1.5M Brightstar ResourcesAuruminResource DevelopmentJul-25599516218-Jul-25 Strategic Acquisition of Aurumin Consolidates Sandstone Brightstar ResourcesLinden GoldResource DevelopmentMar-24243516825-Mar-24 Brightstar makes recommended takeover offer for Linden Gold Alliance Limited Catalyst MetalsVango MiningDFSJan-23661,0026610-Jan-23 Bidders Statement -Catalyst Recommended Takeover for Vango Genesis MineralsLaverton (Focus) ProjectResource DevelopmentMay-252503,9006326-May-25 Acquisition of the Laverton Gold Project AurenneAlt ResourcesPre-Feasibility StudyAug-2023571567-May-20 Alt Receives All Cash Off Market Bid from Private Equity Firm AurenneGroup (7 May 2020); Mt Ida and Bottle Creek Resource Upgrade Brings Total Resource to 571,300 Ounces Gold (2 Apr 2020) St BarbaraBardoc GoldOptimisation StudyDec-211463,0734820-Dec-21 St Barbara to acquire BardocGold via Recommended Scheme of Arrangement Brightstar ResourcesAlto MetalsResource DevelopmentAug-24441,046421-Aug-24 Brightstar to drive consolidation of Sandstone district Beacon MineralsLady Ida ProjectPre-Feasibility StudyMar-23133183924-Mar-23 Beacon Acquires Lady Ida Project Ramelius ResourcesBreaker ResourcesResource DevelopmentMar-23531,6843220-Mar-23 Ramelius Makes Recommended Takeover Offer for Breaker Res NL Brightstar ResourcesMontague East ProjectResource DevelopmentAug-2412507241-Aug-24 Brightstar to drive consolidation of Sandstone district Brightstar ResourcesKingwest ResourcesResource DevelopmentDec-2285051623-Dec-22 Brightstar and Kingwest Resources agree strategic merger to unlock significant potential value for shareholders Genesis MineralsMagnetic ResourcesDFSFeb-26606.32,40025316-Feb-26 Presentation -Magnetic Attraction Gold FieldsGold RoadProductionMay-252,6004,0506425-May-25 Gold Fields enters into binding agreement to acquire Gold Road Resources and withdrawal of cautionary announcement Capricorn MetalsWarriedar ResourcesResource DevelopmentJul-251642,0508024-Jul-25 Capricorn Metals to acquire WarriedarResources AlicantoMinerals LimitedMt Henry-Selene GoldResource DevelopmentDec-2564.69157117-Dec-25 Mt Henry-Selene Gold Divested for $64.6M 1.Enterprise values sourced CapIQon the date of the transaction announcement APPENDIX 33
Appendix 6: Peer Mineral Resource References BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer TickerCompanyStage Proved (koz) Probable (koz) Total Reserve (koz) Grade (g/t) Plant Capacity (Mtpa) Production (koz/year) Source & Date Market Cap ($M) Enterprise Value ($M) EV/ Resource ($/oz) EV/ Reserve ($/oz) EV/ Production ($/oz) BTRBrightstar Resources Operations & DFS 153353511.61.523 Quarterly Activities/Appendix 5B Cash Flow Report (29 April 2026) 29-Apr-264392776978812,269 BC8Black Cat SyndicateOperations143173302.41.296 Quarterly Activities & Appendix 5B (23 Apr 2026) 23-Apr-268317813142,3678,152 MEKMeeka MetalsOperationsN/aN/a3053.80.624 Quarterly Activities/Appendix 5B Cash Flow Report 29-Apr-264273773051,23615,496 BCNBeacon MineralsOperations701762471.211.022 March 2026 Quarter Production Update (16 Apr 2026) 16-Apr-263413023781,22413,949 PNRPantoro GoldOperations1796808592.11.271Quarterly Activities/Appendix 5B (28 Apr 2026)28-Apr-261,2861,0482281,22014,759 OBMOra BandaOperations391962362.41.2155 March 2026 Quarterly Activities Report (16 Apr 2026) 16-Apr-262,7272,49575410,57316,092 CYLCatalyst MetalsOperations08618612.91.2105 March 2026 Quarterly Activities Report (~29 Apr 2026) 29-Apr-261,4741,2973761,50712,414 MI6Minerals260PFSN/aN/aN/aN/aN/aN/a March 2026 Quarterly Activities & Cashflow Report (28 Apr 2026) 28-Apr-261,6981,513336-- AUCAusgoldDFS1,1062241,3301.13.60Quarterly Activities/Appendix 5B (20 Apr 2026)20-Apr-26515417171314- CodeCompanyStageMeasured (koz)Indicated (koz) Inferred (koz) Total resourceGrade (g/t)Source Date BTRBrightstar ResourcesOperations & DFS521,2672,6514,0301.5Investor Presentation18-Mar-26 BC8Black Cat SyndicateOperations571,2801,1522,4882.9Strongly Supported Placement for Kal East Acceleration14-Mar-25 MEKMeeka MetalsOperations556455351,2353.0Turnberry Mineral Resource Upgrade6-May-24 BCNBeacon MineralsOperations962204847991.2Corporate Presentation -5 August 20255-Aug-25 PNRPantoro GoldOperations3741898232746013.3Annual Mineral Resource and Ore Reserve Statement22-Sep-25 OBMOra BandaOperations641,6341,69833102.0Round Dam Mineral Resource Grows Tenfold to 1.33M Ounces11-Mar-26 CYLCatalyst MetalsOperations0269275934533.1 Putting meat on the bones of Catalyst's path to 200,000oz annual gold production 4-Aug-25 MI6Minerals260PFS03000150045001.0Bullabulling Gold Project Mineral Resource Doubles to 4.5Moz1-Dec-25 AUCAusgoldDFS1,5316932192,4431.1Updated Definitive feasibility Study Presentation19-Dec-25 1.Market capitalisations and enterprise values as at29 April 2026 and March 2026 Quarterly cash and debt balances APPENDIX 34
Appendix 7: Peer AnnualisedProduction References¹ BrightstarResources Limited · Building a Multi-Asset Western Australian Gold Producer APPENDIX 1.Annualisedproduction based on March 2026 Quarterly production run-rate from published company disclosures–small variances may occur dur to rounding. TickerCompany MarQ’26 Production (koz) Annualised (koz p.a.) Source & Date NSTNorthern Star Resources 388 1,550 March 2026 Quarterly Activities Report (22 April 2026) EVNEvolution Mining 170 680 March 2026 Quarterly Report (15 April 2026) WGXWestgold 93 373 March 2026 Quarterly Results (29 April 2026) RRLRegis Resources 91 362 Quarterly Activities Report (23 April 2026) GGPGreatland Resources 83 331 March 2026 Quarterly Activities Report (28 April 2026) VAUVault Minerals 79 314 Quarterly Activities Report (22 April 2026) GMDGenesis Minerals 68 270 Quarterly Activities Report -March 2026 (16 April 2026) ALKAlkane Resources 46 183 Quarterly Activity Report (23 April 2026) BGLBellevue Gold 41 163 March 2026 Quarterly Activities Report (29 April 2026) OBMOra Banda 39 155 March 2026 Quarterly Activities Report (16 April 2026) RMSRamelius Resources 38 152 March 2026 Quarterly Report (29 April 2026) CMMCapricorn Metals 30 121 Quarterly Activities/Appendix 5B Cash Flow Report (29 April 2026) EMREmerald Resources 26 105 March 2026 Quarterly Report (23 April 2026) CYLCatalyst Metals 26 105 March 2026 Quarterly Activities Report (29 April 2026) BC8Black Cat Syndicate 24 96 Quarterly Activities & Appendix 5B (23 April 2026) PNRPantoro Gold 18 71 Quarterly Activities/Appendix 5B (28 April 2026) MEKMeeka Metals 6 24 Quarterly Activities/Appendix 5B Cash Flow Report (29 April 2026) KANKaiser Reef 6 22 Quarterly Activities/Appendix 5B Cash Flow Report (29 April 2026) 35
29 April 2026
MARCH 2026 QUARTERLY ACTIVITY REPORT
HIGHLIGHTS
PROJECT & CORPORATE DEVELOPMENT o Updated Goldfields DFS 2.0 released in January 2026 1 delivered compelling economics and provides a strong platform for near-term development of 75koz p.a. of gold production with first gold targeted in JunQ’CY27: Key Metrics Units A$5,500/oz A$6,000/oz A$6,500/oz A$7,000/oz Gold Sales koz 457 Average LOM Annual Production koz 75 Revenue (net of royalties) A$M 2,417 2,637 2,857 3,076 Peak Funding Requirement A$M 196 188 182 178 Free Cash Flow (pre-tax) A$M 758 977 1,197 1,417 NPV 8 (pre-tax) A$M 454 606 758 911 IRR (pre-tax) % 58 74 90 106 Annual Free Cash Flow (pre-tax) A$M 126 163 200 236 C1 Operating Cost A$/oz 2,581 2,581 2,581 2,581 All-In Sustaining Cost (AISC) A$/oz 2,981 2,998 3,015 3,032 NPV 8 / Pre-production Capex Ratio (x) 2.3x 3.2x 4.2x 5.1x
o Successful completion of strategic $193M capital raise comprising a $175M institutional placement 2 and upsized $18M Share Purchase Plan 3
- fully funding equity requirements for Goldfields’ development and fully funds Sandstone to Final Investment Decision o Successful completion of US$120M Senior Secured Nordic Bond 4 from global institutional funds and natural resource investors. The bond structure carries significant structural advantages including limited covenants, operational flexibility to continue to fund Sandstone expenditure, no royalties or dilutive instruments on issue, with a four-year tenor and no principal repayments for 18 months with no mandatory hedging requirements which cap gold price exposure – preserving full gold price upside to the benefit of shareholders o Equity and bond capital raises together provide Brightstar with over $380M of funding to finance Goldfields to gold production (targeted JunQ’CY27) while providing substantial capital to Sandstone to advance drilling and feasibility work streams targeting a Sandstone investment decision from early CY27
2
o Sandstone ‘Strategic Plan’ released
5
outlining two-year pathway to unlocking a district-
scale, long-life production centre:
▪ Two Mineral Resource upgrades targeted in CY26, with a maiden Ore Reserve and PFS
targeted for release 2H’CY26. Sandstone continues to demonstrate strong multi-million-
ounce growth potential
o GR Engineering Services Ltd (ASX:GNG) engaged as preferred EPC contractor for the
construction of 1.5Mtpa Laverton processing plant
6
. Early Works Agreement executed
facilitating the ordering of critical long lead items. Full EPC contract execution anticipated in
JunQ’26 in line with FID
o Mining Development and Closure Proposal approved for Lady Shenton open pit mine in
Menzies, with the deposit now ‘mine ready’
7
OPERATIONS
o Safety performance remained strong across the Group with no Lost Time Injuries
o Group mining production for the quarter of 58.7Kt @ 3.31g/t Au for 6,250oz from Brightstar’s
Laverton underground mining operations
▪ During the quarter, the Fish underground mine transitioned to care & maintenance in line
with the DFS 2.0 mine plan, with mining operations ceasing and the mine positioned to be
ready for the recommencement of ore production in early CY27
o Final processing campaign under the Ore Purchase Agreement (OPA) with Genesis
Minerals Limited (ASX:GMD) successfully completed and reconciled post-quarter end
8
▪ Record processing parcel of ~140kt @ 2.0g/t Au for ~7.9koz recovered gold
(Brightstar’s largest parcel in terms of tonnes and gold produced)
▪ Campaign returned gold recoveries of 89.1%. Gross revenue of $53 million. Gold price
received of A$6,758/oz
o Total ore processed through the Genesis OPA since commencement: ~400kt @ 2.2g/t Au for
~24koz Au recovered and $138 million gross sales proceeds
o OPA proceeds have enabled Brightstar to build out its ‘operational readiness’ to de-risk
and enable the wider Goldfields project development, including the reinvestment of cash
flows across the portfolio – particularly the build out of the Company’s Laverton footprint to
support the wider Goldfields development
Second Fortune Underground Mine
o Mined 36.5kt @ 3.16g/t Au for 3,709oz for the quarter
o Mining continues at Second Fortune with current Life of Mine plan scheduled to cease later in
CY26. All ore mined from Second Fortune from April 2026 is now being stockpiled for processing
through Brightstar’s Laverton processing plant once commissioned in mid CY27
o Stoping of high-grade ore continues, maximising the investment of the already-mined ore drives
3
Fish Underground Mine
o Mined 22.2kt @ 3.57g/t Au for 2,541oz for the quarter
o The Fish underground mine transitioned to care & maintenance (C&M) in February and remains
in a state of ‘operational readiness’, as outlined in the DFS 2.0 mine plan
o Fish is a low-cost C&M mine with minimal water inflows and other capital requirements. The mine
is very well placed for a near-zero capital requirement restart, with stoping operations scheduled
to commence in early CY27
o DFS 2.0 outlined production of 200kt @ 2.8g/t Au for 19koz Au in the Fish ‘Stage 2’ mine plan.
Production is targeted to re-commence in early CY2027 to align with the commissioning of
Brightstar’s proposed new Laverton processing plant to provide high-grade ore during
operational ramp up
EXPLORATION ACTIVITIES & MINERAL RESOURCES
o Brightstar announced a Mineral Resource upgrade at its Lord Byron Deposit within
Brightstar’s Goldfields Hub increasing the Mineral Resource by 6% to 5.4Mt @ 1.5g/t Au for
267koz and an 8% increase in Measured & Indicated Resources to 122koz @ 1.6g/t Au
9
o Drilling continued during the quarter, with programs completed at multiple Sandstone deposits
and results report from drill at the Lord Byron deposit within the Goldfields Hub
o A total of 117 holes were drilled totalling 20,075m. Excellent results were received from all
deposits with select highlights including:
Sandstone Hub
o Two Mile Hill-Shillington
10,11
:
▪ SNRC25-079: 13m @ 5.44g/t Au from 177m, including 2m @ 27.4g/t Au from 184m
▪ SNRD25-003: 12.3m @ 3.60g/t Au from 459m
o Lords Camp
10,11
:
▪ LHRC25038: 5m @ 10.7g/t Au from 57m, including 2m @ 24.7g/t Au from 57m
▪ LNRC26007: 16m @ 1.49g/t Au from 131m
▪ LNRC25015: 2m @ 9.04g/t Au from 46m
o Vanguard
12
:
▪ VNRC25148: 7m @ 5.59g/t Au from 162m
▪ VNRC25117: 14m @ 2.44g/t Au from 62m
▪ VNRC25112: 8m @ 4.25g/t Au from 20m
o Indomitable Camp
11,12,13
:
▪ INDD25001: 4.2m @ 26.7g/t Au from 113.9m
▪ INDD25002: 5.9m @ 5.41g/t Au from 48.0m
▪ INDD25005: 4.5m @ 3.47g/t Au from 33.0m and 6.5m @ 11.7g/t Au from 69.5m
▪ SSAC25199: 24m @ 3.97g/t Au from 48m, including 8m @ 10.4g/t Au from 60m
▪ SSAC25224: 12m @ 2.08g/t from 124m
▪ SSAC25134: 100m @ 0.51g/t Au from 12m
4
o Whistler
10
:
▪ WHRC25004: 31m @ 5.17g/t Au from 126m, including 10m @ 10.6g/t Au from 137m
▪ WHRC25006: 13m @ 3.54g/t Au from 113m
o Achilles North
11
:
▪ ACRC25002: 3m @ 42.5g/t Au from 158m, including 1m @ 125g/t Au from 159m
▪ ACRC25008: 4m @ 5.16g/t Au from 127m
Goldfields Hub
o Lord Byron
9
:
▪ LBRC25017: 9m @ 3.49g/t Au from 138m, including 1m @ 24.7g/t Au from 142m
▪ LBRC25015c: 4m @ 6.71g/t Au from 128m, including 1m @ 19.6g/t Au from 129m
and 2m @ 14.5g/t Au from 148m
▪ LBRC25001: 32m @ 7.16g/t Au from 69m, including 11m @ 15.1g/t Au from 87m
and 11m @ 3.13g/t Au from 53m
QUARTERLY PHYSICALS & SALES SUMMARY Brightstar Resources Ltd (Brightstar or the Company) (ASX: BTR) is pleased to announce its operational activities for the March 2026 quarter, outlined below. PRODUCTION SUMMARY
MarQ 2025 JunQ 2025 SepQ 2025 DecQ 2025 MarQ 2026
Unit Total Total Total Total Total Mining operations
Development ore:
Ore mined kt 8.2 11.7 33.0
30.8 7.4
Grade mined g/t Au 2.53 2.79 3.01
2.27 3.47
Contained gold oz 667 1,047 3,192
2,246 820
Stope ore:
Ore mined kt 20.0 23.0 36.2
57.6 51.4
Grade mined g/t Au 3.63 3.54 3.27
3.03 3.29
Contained gold oz 2,334 2,619 3,810
5,600 5,431
Total ore mined:
Ore mined kt 28.2 34.7 69.2
88.3 58.7
Grade mined g/t Au 3.31 3.29 3.15
2.76 3.31
Contained gold oz 3,002 3,667 7,002
7,846 6,250
i
Metres advanced:
Operating m 406 469 783
677 457
Capital (drives) m 151 249 340
399 249
Capital (decline) m 140 531 368
304 186
Total metres m 697 1,249 1,491
1,380 892
i. The Fish underground mine transitioned to interim care & maintenance in February 2026 as outlined in the DFS 2.0 mine plan and to coincide with the completion of the Genesis OPA, which contributed to reduced production during the MarQ’26
5 FIFTH GOLD PROCESSING CAMPAIGN COMPLETED 8
During the March quarter, ore processing for the fifth and final campaign was completed at Genesis Minerals
Ltd’s (ASX:GMD) Laverton Mill under the Ore Purchase Agreement (OPA).
The fifth parcel completed processing during the quarter and comprised a record parcel size for the
Company – both in terms of tonnes processed and gold poured – with a total of ~138kt of ore processed,
at a reconciled blended head grade of 2.0g/t Au, which recovered 7,873oz Au at an 89.1% recovery.
This brings to an end Brightstar’s OPA with Genesis under which, total ore of ~400kt @ 2.2g/t Au was
processed recovering ~24koz Au delivering $138 million in gross sales proceeds.
The OPA has enabled Brightstar to build out its ‘operational readiness’ in preparation for its gold production
growth strategy in the Goldfields district with OPA cash flows reinvested across the portfolio – particularly
the build out of the Company’s Laverton footprint to support larger scale mining operations as planned
feed for Brightstar-owned processing infrastructure to leverage sunk capital across camps, haul roads,
workshops and other supporting infrastructure.
The final reconciliation payment (+$23 million) following completion of the final OPA parcel is due to
be received in April.
SALES SUMMARY
MarQ 2025 JunQ 2025 SepQ 2025 DecQ 2025 i
MarQ 2026
Unit Total Total Total Total Total Sales
Ore sales:
Ore sold kt 74.9 68.6 51.2
82.5 108.9
Grade g/t Au 2.19 2.08
2.34 2.65 1.79
Contained gold oz 5,268 4,587 3,857
7,014 6,263
Recovery % 94% 92% 80%
81% 90%
Recovered gold oz 4,960 4,225 3,072
5,711 5,636
Inventory
Ore kt 167.7 143.3
157.2 161.6 102.1
Grade g/t Au 0.97 0.93
1.13 1.12 1.36
Contained gold oz 5,219 4,272
5,713 5,805 4,467
i. The December 2025 quarter is restated to allocate the adjustment relating to final physicals, revenue
and processing costs realised during the March 2026 quarter and relating to the December 2025
quarter following finalisation of the processing reconciliations in the March 2026 quarter.
6 FINANCIAL SUMMARY Financial Summary i
JunQ 2025 SepQ 2025 DecQ 2025 ii
MarQ 2026 Sales:
Gold sales oz 4,225 3,072 5,711 5,636 Average price received A$/oz 5,151 5,860 6,373 6,754 Sales proceeds iii $000 21,763 18,003 36,395 38,064 Cost summary:
Mining $000 (6,029) (10,203) (9,726) (6,164)
Site services/G&A $000 (1,972) (4,557) (5,124) (4,984)
Haulage and Processing
iii
$000 (9,738) (8,220) (12,150) (19,298)
Cash operating costs $000 (17,739) (22,979) (27,000) (30,446)
Royalties $000 (835) (548) (807) (1,413)
Sustaining Capital $000 (3,161) (1,604) (5,462) (5,124)
Mine operating cash flow/(deficit)
iv
$000 28 (7,128) 3,126 1,081
Growth Capital (projects in production) $000 (576) (568) (1,868) (3,204)
Net mine cash flow/(deficit)
v
$000 (548) (7,696) 1,258 (2,123)
Growth Capital (Fish Mine development)
vi
$000 (11,366) (4,756) - -
Ore Inventory Adjustments (non-cash) $000 (1,121) 3,431 4,538 (3,460)
Total non-cash & growth capital costs $000 (12,487) (1,325) 4,538 (3,460)
i. Information in this Financial Summary is presented on an accrual basis.
ii. The December 2025 quarter is restated to allocate the adjustment relating to final physicals, revenue and processing costs
realised during the March 2026 quarter and relating to the December 2025 quarter production following finalisation of the
processing reconciliations in the March 2026 quarter.
iii. Sales proceeds are presented on a gross basis assuming all recoverable ounces delivered to Mt Morgans (both processed
and unprocessed) are sold before any adjustments are made for processing costs or other charges under the Genesis OPA.
Processing charges are included on a gross basis within haulage and processing costs. Direct haulage costs include haulage
and road maintenance of unsealed roads from Second Fortune (~102km) and Jasper Hills (~124km) to Genesis’ Laverton Mill.
iv. Mine operating cash flow/(deficit) = Sales proceeds less cash operating costs, royalties and sustaining capital.
v. Net mine cash flow = Mine operating (cash flow) less growth capital (projects in production).
vi. Relates to Fish Mine capital including start-up costs, expenditure on plant and equipment and mine development activities.
Commercial production refers to a period where the mine has operated as intended by management for a sustained period.
During the March quarter, the company continued to incur expenditure on development related to
advancing and de-risking the Goldfields Project in-line with the project development plan outlined in the
DFS 2.0.
During the quarter, Brightstar invested $5.1 million in Sustaining Capital in the mining operations, with
$3.9 million directly attributable toward ‘Stage 2’ of the Fish mine plan, supporting future DFS 2.0 mining
activities (not current operations). Additionally, of the $3.2 million categorised as Growth Capital (projects
in production), $2.2 million was incurred on expansions to the Lord Byron/Fish mining camp required for
the processing plant construction crew and eventually the Lord Byron open pit mining workforce.
The Company incurred exploration and studies expenditure of $7.2 million and corporate expenditure
of $2.7 million for the March 2026 quarter.
7
Figure 1: Brightstar’s Portfolio
MINING & OPERATIONS SECOND FORTUNE UNDERGROUND MINE
Second Fortune mined a total of 36,542t @ 3.16 g/t Au for 3,709oz Au contained gold in the March quarter,
comprising of:
o 7,359t @ 3.47 g/t Au of development ore, and
o 29,184t @ 3.08 g/t Au of stope ore.
Total development for the quarter was 580m, consisting of 49m of Decline, 87m of capital and 426m of
operating development.
Mining continues at Second Fortune with current Life of Mine (LOM) plan scheduled to cease in SepQ’CY26
– all ore mined from Second Fortune from April 2026 is now being stockpiled for processing through
Brightstar’s Laverton processing plant once commissioned in mid CY27.
Following LOM changes related to DFS 2.0 In January, the Decline was developed down to the 955 Level and
capital development works ceased. Development ore driving continued on the 995 and 975 levels with
stoping occurring on the on the 1015 and 995 levels.
8
Figure 2: Second Fortune Life of Mine plan
FISH UNDERGROUND MINE Fish mined a total of 22,168t @ 3.57 g/t Au for 2,541oz Au of contained gold in the March quarter, comprising of stope ore only. Fish transitioned to a state of ‘mine readiness’ during the quarter with major mining operations ceased and the mine positioned to be ready for the recommencement of ore production in early CY27 to provide a high- grade underground feed to Brightstar’s Laverton processing plant upon commissioning in 2027. Total development for the quarter was 331m, consisting of 138m of Decline, 162m of capital and 30m of operating development. Capital development focused on ‘Stage 2’ advance, with the mine advancing 25m vertically before ceasing ahead of transition to operational readiness. Capital infrastructure works to upgrade the primary pump system were completed along with exploration development drives and vent access. Ore driving for the current stage one levels (1350, 1330 and 1310) was completed in the DecQ’25 quarter. Brightstar intends to complete further ‘Stage 2’ diamond drilling in the SepQ’26 quarter for grade control purposes.
9
Figure 3: Fish Life of Mine plan (to recommence ore production in early CY27) DEVELOPMENT & STUDIES GOLDFIELDS EXECUTION Brightstar continues early works and site preparation at its Goldfields Project in anticipation of a formal Final Investment Decision (FID) for the project in JunQ’26. This follows completion of the recently announced debt and equity funding package and selection of GR Engineering Ltd as preferred Engineering, Procurement and Construction (EPC) contractor for the construction of Brightstar-owned processing infrastructure.
Figure 4: Brightstar’s Goldfields Project
10
Figure 5: Goldfields DFS 2.0 production profile
Figure 6: Goldfields Execution Plan GR ENGINEERING SELECTED AS PREFERRED EPC CONTRACTOR 6
During the quarter, Brightstar selected GR Engineering Services Limited (ASX:GNG) as the preferred
contractor for the EPC contract of the new 1.5Mtpa gold processing plant at Laverton as part of the Goldfields
Project. Following completion of a competitive Front End Engineering Design (FEED) process in December
2025, an Early Works Agreement (EWA) was executed which has enabled the ordering of critical long-lead
items, including the SAG mill and variable speed drive, together with continued detailed engineering and
operational readiness activities.
This appointment positions Brightstar to commence full construction of the processing plant under a lump-
sum fixed-price EPC contract structure with construction works, subject to FID, anticipated to commence in
JunQ’26 with first gold pour on planned for JunQ’27.
5
75
78
79
77
76
67
20 40 60 80 100 2027202820292030203120322033 Gold (koz) Financial Year Goldfields DFS 2.0 Production (koz)
11
Figure 7: 1.5Mtpa Laverton processing plant engineered design
SANDSTONE GOLD PROJECT SANDSTONE STRATEGIC PLAN 5
During the quarter, Brightstar released its Strategic Plan to Unlock Sandstone, outlining a targeted two-year
pathway to transform the existing 2.4Moz @ 1.5g/t Au Project into a district-scale, long-life production centre.
A Maiden Ore Reserve and Pre-Feasibility Study (PFS) remain on schedule for delivery in 2H’CY26.
The plan is built on three strategic pillars:
-
Improve Mineral Resource Quality and Continue Organic Growth Targeting material improvements to the existing 2.4Moz @ 1.5g/t Au Mineral Resource
-
Maximise Mineral Resource-to-Ore Reserve conversion Underpinned by comprehensive & quality technical work, Brightstar seeks to convert a significant component of the shallow Mineral Resources into Ore Reserves in the PFS (1.6Moz Au of the MRE is located within the top 150m from surface)
-
‘Right-size’ processing infrastructure As the foundation for a district-scale, long-life production centre, Brightstar is assessing a range of large throughput processing plants to align capital requirements, execution risk and gold production profile outcomes.
12
Figure 8: Brightstar’s consolidated Sandstone Project
The Sandstone Strategic Plan positions the project as the next major growth driver for Brightstar following the development of the fully-funded Goldfields Hub, supporting the Company’s TARGET200 vision of becoming a multi-asset +200,000oz pa Western Australian gold producer. Delivery into this strategy is on track with the status of these key work streams set out below.
STRATEGIC PILLAR
STATUS 1
Improve Mineral Resource Quality and
Continue Organic Growth
targeting material Mineral Resource upgrades
to the existing 2.4Moz @ 1.5g/t Au endowment
✓ Completion of the M&A-led growth strategy which has delivered critical mass Transition from infill drilling to extensional drilling & greenfield targets. Drilling 100km at Sandstone in CY26
2
Maximise Mineral Resource-to-Ore Reserve conversion underpinned by comprehensive & quality technical work
✓ PFS infill drilling near completed, targeting material upgrade in M&I classification in JunQ’26 Geotechnical, metallurgical & design work streams advancing in support of maiden Ore Reserve in PFS
3
‘Right-size’ processing infrastructure as foundation for district-scale, long-life production centre
✓ Large-scale processing plant site identified – leveraging 1.6Moz of gold occurring within the top 150m from surface of Sandstone’s Mineral Resource Engineering, costing, permitting & approvals work streams advancing in support of PFS due late CY26
13
The Sandstone PFS and maiden Ore Reserve is due for delivery late in CY26 with multiple workstreams ongoing including: • metallurgical testwork programs; • geotechnical assessments (including geotechnical DD drilling); • open pit mine optimisations; • underground mine designs in relation to the large-scale Two Mile Hill-Shillington deposit; • capital infrastructure costings; • processing infrastructure design; and • permitting and approvals activities.
Figure 9: Sandstone Strategic Plan – Execution timetable
EXPLORATION ACTIVITIES OPERATIONS OVERVIEW
SANDSTONE DRILLING ACTIVITIES
During the March Quarter, Brightstar completed drilling campaigns at the Two Mile Hill-Shillington, Lord
Nelson, Lord Henry, Vanguard, Bollinger and Indomitable Camp Deposits at the Sandstone Project, and
at the Whistler and Achilles North Deposits at the Montague Project.
The Sandstone Gold Project has a current Mineral Resource Estimate of 2.4Moz @ 1.5g/t Au.
14
Figure 10: Geology of Brightstar’s Sandstone Project showing deposit and prospect locations.
Two Mile Hill-Shillington
10,11
The combined Two Mile Hill-Shillington deposit hosts a current MRE of 755koz @ 1.6g/t Au. In late 2025,
Aurumin Ltd completed RC and diamond core drilling programs across the central Sandstone project, prior
to the implementation of the Scheme of Arrangement with Brightstar.
The Two Mile Hill-Shillington complex includes a late-stage, near vertical, intrusive tonalite stock, which cuts
the local stratigraphy of mafic volcanics and BIF. Gold mineralisation is developed in the tonalite, the
enveloping basalts, the BIF and the overlying laterite.
The Two Mile Hill intrusive Mineral Resource has a total strike length of approximately 260m and is
approximately 100m wide, dipping steeply to the northwest. The body remains open at depth with
current drilling defining mineralised tonalite beyond 725m below surface.
A total of 28 RC holes for 4,300m were completed, with four diamond tails drilled for ~1,240m. The
program targeted infill and depth extension to the deposits, as well as providing geotechnical data to inform
ongoing pre-feasibility study work. Additional modest RC drilling programs were completed at the Mcintyre
(4 holes, ~380m) and Old Town Well (4 holes, ~320m) deposits, targeting resource infill.
15
Significant assays from the Shillington-Two Mile Hill RC program including:
• 13m @ 5.44g/t Au from 177m, including 2m @ 27.4g/t Au from 184m in SNRC25-079
• 1m @ 24.9g/t Au from 201m in SNRC25-058
• 7m @ 3.12g/t Au from 66m in SNRC25-082
• 3m @ 7.16g/t Au from 245m, including 1m @ 17.8g/t Au from 247m in SNRC25-085
The diamond drilling program comprised four diamond holes from surface for ~1,200m and an additional
five diamond tails drilled onto existing RC pre-collars, for ~1,250m. The program targeted infill and depth
extension to the deposits, as well as providing geotechnical data to inform ongoing pre-feasibility study work.
Brightstar’s reported drilling (orientated towards ~220°) was targeted to be perpendicular to the dominant
gold mineralised quartz veins within the Tonalite intrusive (Figure 11).
Significant assays from the Two Mile Hill DD program include:
• 1m @ 19.0g/t Au from 119m in SND25-001
• 3m @ 8.50g/t Au from 136m in SND25-001
• 22.7m @ 3.02g/t Au from 267.3m in SND25-001
• 11m @ 3.10g/t Au from 392m in SND25-001
• 2m @ 41.3g/t Au from 425m in SND25-001
• 2.4m @ 12.8g/t Au from 487m in SND25-001
• 1m @ 70.5g/t Au from 140m in SNRD25-001
• 18m @ 3.07g/t Au from 234m in SNRD25-001
• 1m @ 22.0g/t Au from 434m in SNRD25-003
• 12.3m @ 3.60g/t Au from 459m in SNRD25-003
The high-grade intervals were typically present within wide haloes of lower grade material.
Significant intercepts for these wide zones include:
• 411.2m @ 1.11g/t Au from 80m in SND25-001
• 162.3m @ 1.38g/t Au from 140m in SNRD25-001
• 147.7m @ 1.01g/t Au from 355m in SNRD25-003
16
Figure 11: Cross section of the Two Mile Hill-Shillington Deposit Lord Nelson 10,11
The mineralisation at Lord Nelson is mostly within a granodiorite intrusion, the Lords Granodiorite, with a
high-grade zone on the contact between the granodiorite and the ultramafic footwall. In general, the
mineralisation trends north-northwest, dipping approximately 50
0
to the west increasing to 70
0
with depth
and plunging to the south.
The mineralisation is typically characterised by a visible zone of pyrite+silica+biotite+/-quartz veining that
follows the ultramafic footwall contact.
The current program of 14 drill holes for ~2,500m and was designed to infill mineralisation within a portion
of the current mineral resource, ensuring sufficient drill spacing for future MRE updates to support Indicated
resource classification.
17 Significant results from the current RC drilling program include; • 16m @ 1.49g/t Au from 131m, including 2m @ 5.86g/t Au from 142m in LNRC26007 • 12m @ 1.35g/t Au from 162m in LNRC26010 • 5m @ 2.15g/t Au from 167m in LNRC26013 Lord Henry 10,11
The Lord Henry deposit is located 30km southeast of the town of Sandstone and features a package of north-
dipping lodes hosted within the Lords Granodiorite. The deposit was mined as a shallow open pit by Troy
Resources from 2005-2007, producing 48koz @ 3.61g/t Au.
Lord Henry hosts a current MRE of 99koz @ 1.4g/t Au.
The recent drilling program comprised 30 RC holes for ~3,100m predominantly targeting extensions of the
lodes to the north as well as infill of several remaining zones of inferred resource in the current MRE. An
additional 341m of diamond drilling was completed (3 holes) with all assays still outstanding.
The RC drillholes intersected zones of sericite-altered host rock with quartz veining and minor sulphides
(pyrite and chalcopyrite).
Significant intercepts from the drilling include (Figure 12):
• 5m @ 10.7g/t Au from 57m, including 2m @ 24.7g/t Au from 57m, in LHRC25038
• 2m @ 9.04g/t Au from 46m, including 1m @ 16.8g/t Au from 46m, in LHRC25015
• 6m @ 2.63g/t Au from 98m, including 1m @ 11.9g/t Au from 98m, in LHRC25016
• 4m @ 3.73g/t Au from 44m in LHRC25035
• 2m @ 6.98g/t Au from 104m in LHRC25040
Figure 12: Cross Section B-B' looking East at the Lord Henry deposit
18 Vanguard 12
Mineralisation at the Vanguard deposit is associated with quartz-pyrite shear lodes hosted in a differentiated
dolerite sill. The current drilling program totalled 72 RC holes for ~8,800m of drilling.
The RC component of the drilling program targeted further infill of the mineralised lodes to facilitate
resource upgrades to the Indicated classification in the upcoming Sandstone MRE update.
Significant assays from the returned results including:
• 7m @ 5.59g/t Au from 162m in VNRC25148
• 14m @ 2.44g/t Au from 62m, including 1m @ 13.1g/t from 74m in VNRC25117
• 8m @ 4.25g/t Au from 20m in VNRC25112
• 14m @ 2.31g/t Au from 133m in VNRC25136
• 13m @ 2.31g/t Au from 49m in VNRC25134
• 5m @ 5.23g/t Au from 30m in VNRC25150
Bollinger
13
A recent gravity survey by Brightstar identified that the potential host unit at Bollinger could be far more
extensive than previously interpreted by past explorers. The survey has highlighted three distinct gravity
lows, underlying historical gold anomalism. The survey showed the underlying gold system to potentially be
analogous to the mineralisation within Hancocks camp deposits, where sheeted vein arrays are hosted
within a granodiorite stock.
The program totalled 37 holes for 3,900m of drilling, testing the entire strike extent of the underlying
intrusions including the previously identified soil and regolith gold anomalism.
Results from the program have confirmed bedrock mineralisation extends deeper than previously identified,
including multiple first pass results exceeding 20gram-metres. The encouraging initial results from this
aircore drilling will feed into Brightstar’s 2026 exploration campaign, targeting further bedrock extensions to
the intersected high-grade mineralisation.
Significant intercepts from the drilling include:
• 12m @ 2.08g/t from 124m, including 4m @ 5.60g/t Au from 124m in SSAC25224
• 32m @ 0.93g/t from 16m, in SSAC25230
• 12m @ 1.32g/t from 36m, in SSAC25222
• 8m @ 1.58g/t from 44m, in SSAC25236
Indomitable Camp
11,12,13
The ‘Indomitable Camp’ is situated 12km southeast of Sandstone townsite. The camp comprises three main
deposits (Indomitable, Indomitable East, and Musketeer), as well as three minor resources (Ladybird, Piper
and Tigermoth).
Together, the deposits host a current MRE of 296koz @ 1.1g/t Au.
19
The diamond drilling program aimed to infill the existing drilling while providing important structural and
geotechnical data and metallurgical samples.
The Musketeer deposit features banded iron units (BIFs) located on the contact between a hangingwall
basalt unit and a footwall ultramafic.
Three diamond holes were completed for ~440m. The drilling intersected zones of altered BIF units with
felsic porphyry intrusions. Significant pyrite and quartz veining was associated with the BIF zones.
Intercepts from the Musketeer drilling include:
• 4.2m @ 26.7g/t Au from 113.9m, including 0.75m @ 65.4g/t Au from 116.0m in INDD25001
• 5.9m @ 5.41g/t Au from 48.0m, including 1.3m @ 19.7g/t Au from 48.0m in INDD25002
• 2.0m @ 5.34g/t Au from 58.0m in INDD25002
• 1.1m @ 10.4g/t Au from 134.9m in INDD25003
Figure 13: Cross section of the Musketeer Deposit.
The Indomitable deposit is hosted within a deeply weathered ultramafic unit. Mineralisation is typically
associated with stratigraphy-parallel northwest-dipping lodes, although mineralisation has also been
interpreted in north-south oriented lodes, aligned with a major structural fabric.
Two diamond drillholes were completed for ~370m, intersecting zones of strong sericite alteration with
quartz veining beneath a weathered clay zone extending to >100m downhole.
20 Significant intercepts from the diamond drilling include: • 4.5m @ 3.47g/t Au from 33.0m in INDD25005 • 6.2m @ 4.05g/t Au from 44.0m in INDD25005 • 6.5m @ 11.7g/t Au from 69.5m in INDD25005 • 6.8m @ 1.91g/t Au from 161.2m in INDD25005 • 7.0m @ 1.74g/t Au from 51.0m in INDD25006 • 11.4m @ 1.42g/t Au from 73.7m in INDD25006
Indomitable North 13
The Indomitable North target was identified as a zone of considerable structural complexity and high tenor
geochemical anomalism within the Indomitable Camp of deposits which includes Indomitable, Musketeer,
and Indomitable East.
The zone straddles both north-south structures of the Indomitable trend and north-west trends of the
Indomitable East trend. At this structural interface, a large coherent gold-in-soil anomaly is observed over a
strike length of 1.7km, highlighted by a core of +100ppb gold anomalism over 750m in a north-south
orientation.
Seventy aircore holes were completed for ~6,900m, drilled at 50m hole spacing along four 200m-spaced
lines. An additional three infill lines were also completed in prospective traverses guided by initial first pass
logging and proximity to historical anomalism.
Results from this first pass drilling discovered multiple horizons of gold and pathfinder anomalism
throughout the lower regolith profile.
This included the final hole drilled at Indomitable North, where 24m @ 3.97g/t Au was intersected from 48m
in SSAC25199, including 8m @ 10.4g/t Au from 60m. The result was coincident with intersection of thick
quartz reefs, presenting a compelling target for follow-up drilling. Gold anomalism at the prospect is also
associated with significant As-Ag-Te pathfinder anomalism, typically observed in large orogenic gold systems.
Significant assay results from this first-pass drilling include:
• 24m @ 3.97g/t Au from 48m, including 8m @ 10.4g/t Au from 60m in SSAC25199
• 100m @ 0.51g/t Au from 12m in SSAC25134
• 20m @ 1.20g/t Au from 48m in SSAC25186
• 4m @ 2.49g/t Au from 104m in SSAC25142
• 4m @ 2.16g/t Au from 40m in SSAC25168
21
Figure 14: Plan view of the aircore drilling programs at the Indomitable North and Bollinger prospects. Drillhole collars are displayed, coloured by maximum gold value in hole (g/t)
22
Figure 15: Cross section through the Indomitable North Prospect displaying aircore drillholes SSAC25195-199.
Whistler
10
The 120koz Au Whistler deposit and the 163koz Au Montague-Boulder (Figure 16) deposit lie within the
Montague zone of the Gum Creek Greenstone Belt. This belt consists of a northwest-trending sequence of
metamorphosed basalts, banded iron formations, felsic volcanic rocks, and sedimentary units, intruded by
concordant dolerite, gabbro, and granodiorite bodies.
The deposits are associated with the margins of a felsic intrusion, the Montague Granodiorite, with Whistler
located at the northern tip, and Montague-Boulder on the western margin.
At Whistler, mineralisation is mostly within the granodiorite, close to the contact with a basalt unit. The site
of the mineralisation appears to be related to an embayment in the granodiorite contact. Drilling
encountered mineralisation hosted within strongly silica-pyrite-chlorite altered granodiorite, associated with
quartz-carbonate veining.
The recent drilling program comprised 6 RC holes for ~1,100m predominantly targeting further infill of the
mineralised lodes prior to an updated MRE.
Significant intercepts from the RC drilling include:
• 31m @ 5.17g/t Au from 126m, including 10m @ 10.6g/t Au from 137m in WHRC25004
• 8m @ 1.36g/t Au from 178m in WHRC25004
• 8m @ 2.68g/t Au from 135m, including 1m @ 12.7g/t Au from 139m in WHRC25003
• 9m @ 3.64g/t Au from 146m, including 2m @ 8.77g/t Au from 150m in WHRC25003
• 13m @ 3.54g/t Au from 113m, including 4m @ 8.79g/t Au from 115m in WHRC25006
23 • 13m @ 3.32g/t Au from 99m in WHRC25008 • 11m @ 2.65g/t Au from 115m in WHRC25008 • 9m @ 1.62g/t Au from 138m in WHRC25008
Figure 16: Deposits within the Montague Project, part of Brightstar’s Sandstone Hub
Achilles North 11
The Achilles North deposit comprises part of the Montague project, located 70km north of the town of
Sandstone. The deposit hosts a current mineral resource estimate of 99Koz @ 1.5g/t Au, including the
neighbouring Airport deposit.
Primary mineralisation is hosted in east-dipping lodes (Figure 17), in proximity to the contact of the
Montague Granodiorite within a basalt unit. Secondary supergene mineralisation also is present.
24 The drilling program aimed to validate the extents of the existing mineralisation and guide follow-up infill programs. A total of 16 RC holes were drilled for ~2,400m, intersecting narrow shear zones with pyrite-rich quartz veining hosted in both the basalt and internal to the granodiorite. Significant intercepts from the drilling include: • 3m @ 42.5g/t Au from 158m, including 1m @ 125g/t Au from 159m in ACRC25002 • 4m @ 5.16g/t Au from 127m, including 1m @ 11.4g/t Au from 127m in ACRC25008 • 3m @ 3.37g/t Au from 205m in ACRC25011 • 5m @ 1.90g/t Au from 66m in ACRC25004
Figure 17: Cross section through the Achilles North Deposit
25 GOLFIELDS DRILLING Lord Byron 9
The Lord Byron deposit is hosted within a package of mafic amphibolite and banded iron sedimentary units
(BIF). The stratigraphy is cut by a 100m-wide zone of shearing (the “Bicentennial Shear”), which hosts the bulk
of the mineralisation.
The latest drilling was designed to test for extensions in the south, where recent drilling had intersected wide
zone of high-grade material. The lode remains completely open down-dip and along strike to the south. This
drilling, combined with the initial phase targeting this zone has resulted in a small upgrade to the overall
MRE at the deposit, including an upgrade to the higher confidence indicated category.
A total of ~1,100m of RC drilling was completed in this follow-up program. The drilling intersected strongly
sheared amphibolite with significant quartz veining and sulphide mineralisation, predominantly pyrite.
The results suggest the lode dips steeper than originally interpreted and is striking more towards the south-
southeast, explaining the lack of significant intercepts in drillholes LBRC25019 and LBRC25020, which
targeted a substantial step-out towards east-southeast. The results also highlight an apparent depletion
zone between the base of transported material and the base of complete oxidation (Figure 18), suggesting
gold has been leached from this upper section of the saprolite profile. This may have implications for
exploration at Jasper Hills as this depletion zone could mask mineralisation from existing shallow
reconnaissance drilling.
Significant intercepts from the drilling include:
• 9m @ 3.49g/t Au from 138m, including 1m @ 24.7g/t Au from 142m in LBRC25017
• 4m @ 6.71g/t Au from 128m, including 1m @ 19.6g/t Au from 129m and 2m @ 14.5g/t Au from
148m in LBRC25015c
• 32m @ 7.16g/t Au from 69m, including 11m @ 15.1g/t Au from 87m and 11m @ 3.13g/t Au from
53m in LBRC25001
• 30m @ 3.02g/t Au from 4m, including 1m @ 15.2g/t Au from 70m and 2m @ 5.04g/t Au from 78m
in LBRC25005
26
Figure 18: Cross section through the Lord Byron Deposit
Lord Byron MRE Update 9
Results from the drilling program, and other recent drilling targeting the southern extension at the Lord
Byron deposit, have been included in an MRE update.
The Mineral Resource upgrades at Lord Byron include:
▪ 6% increase in Total Mineral Resource to 5.4Mt @ 1.5g/t Au for 267koz
▪ 8% increase in Measured & Indicated Resource 122koz @ 1.6g/t Au
The purpose of the MRE update, despite the modest additional drilling completed since the prior
upgrade, was to facilitate the inclusion of the new geological data in the January 2026 DFS 2.0,
particularly the upgrade of the indicated component in the south to potentially add reserve ounces in
this area.
27
Figure 19: 3D image of the updated Lord Byron MRE block model (by grade), in relation to the existing historical open pits and the June 2025 DFS pit shells.
CORPORATE
EQUITY RAISE 2,3
During the quarter, Brightstar successfully completed a strategic equity capital raising that fully funds the
equity component of the Goldfields Project development and provides substantial capital to advance
the Sandstone Gold Project through to Final Investment Decision.
On 2 February 2026, the Company announced firm commitments to raise A$175 million (before costs)
through a two-tranche institutional placement to tier one, long-only international and domestic institutional
investors, together with a Share Purchase Plan (SPP) initially targeted to raise circa A$5 million at the same
issue price as the placement.
The placement attracted strong support and welcomed a number of new high-quality natural resources-
specialist funds to the share register.
Due to overwhelming demand from eligible retail shareholders, applications under the SPP totalled
approximately A$25.8 million, resulting in the SPP being upsized to A$18 million as announced on 3 March
2026. The combined institutional placement and upsized SPP raised total gross proceeds of A$193 million,
which were successfully settled on 20 March 2026 as part of the broader funding package.
28 SENIOR SECURED BOND ISSUE 4
During the quarter, Brightstar successfully completed a US$120M Senior Secured Nordic Bond issuance
following strong investor demand from international institutional funds and natural resource specialist
investors.
The Bond was settled on 20 March 2026 as part of the overall funding package. Together with the equity
raise, Brightstar has secured total available funding of over $380M.
The Bond features a simple and attractive structure with a 12.5% p.a. coupon, four-year tenor, no principal
repayments for 18 months, a tiered amortisation profile thereafter with a 20% bullet repayment at maturity.
Importantly, the Bond also provides flexibility to fund a material ongoing Sandstone exploration and
feasibility study budgets, and an in-built mechanism to divert significant operational free cash flow from
Goldfields to Sandstone.
The Bond also contains no mandatory hedging, royalties, options, warrants or other dilutive instruments,
preserving full gold price upside for shareholders.
FINANCIAL COMMENTARY
Quarterly Financials
The Company’s Quarterly Cashflow Report (Appendix 5B) follows this activities report. As at 31 March 2026,
the Company had $166.6 million in cash and $12.7M available to draw on the Ocean Partners working capital
facility.
Total cash and working capital available as at 31 March 2026 is $179.3 million.
The final reconciliation payment (+$23 million) following completion of the final OPA parcel is due to
be received in April.
During the quarter, upon issue of the Senior Secured Bond, the Company received net bond proceeds of
A$154.0 million. These funds were transferred to escrow accounts (classified as “restricted cash”) until the
satisfaction of customary conditions precedent for a fully secured bond of this nature, including completion
of security documentation and satisfaction of a typical cost-to-complete test of each drawdown. Funds will be
withdrawn from the escrow account to meet construction and development payments associated with the
Goldfields Project.
The total amount paid to related parties of Brightstar and their associates, as per item 6.1 of the Appendix
5B, was $263,000 for Directors fees, salaries and superannuation.
29 FINANCIAL SUMMARY Financial Summary i
JunQ 2025 SepQ 2025 DecQ 2025 ii
MarQ 2026 Sales:
Gold sales oz 4,225 3,072 5,711 5,636 Average price received A$/oz 5,151 5,860 6,373 6,754 Sales proceeds iii $000 21,763 18,003 36,395 38,064 Cost summary:
Mining $000 (6,029) (10,203) (9,726) (6,164) Site services/G&A $000 (1,972) (4,557) (5,124) (4,984) Haulage and Processing iii $000 (9,738) (8,220) (12,150) (19,298) Cash operating costs $000 (17,739) (22,979) (27,000) (30,446) Royalties $000 (835) (548) (807) (1,413) Sustaining Capital $000 (3,161) (1,604) (5,462) (5,124) Mine operating cash flow/(deficit) iv $000 28 (7,128) 3,126 1,081 Growth Capital (projects in production) $000 (576) (568) (1,868) (3,204) Net mine cash flow/(deficit) v $000 (548) (7,696) 1,258 (2,123) Growth Capital (Fish Mine development) vi $000 (11,366) (4,756) -
Ore Inventory Adjustments $000 (1,121) 3,431 4,538
(3,460)
Total non-cash & growth capital costs $000 (12,487) (1,325)
4,538 (3,460)
i. Information in this Financial Summary is presented on an accrual basis.
ii. The December 2025 quarter is restated to allocate the adjustment relating to final physicals, revenue and processing costs realised during the
March 2026 quarter and relating to the December 2025 quarter production following finalisation of the processing reconciliations in the March
2026 quarter.
iii. Sales proceeds are presented on a gross basis assuming all recoverable ounces delivered to Mt Morgans (both processed and unprocessed) are
sold before any adjustments are made for processing costs or other charges under the Genesis OPA. Processing charges are included on a gross
basis within haulage and processing costs. Direct haulage costs include haulage and road maintenance of unsealed roads from Second Fortune
(~102km) and Jasper Hills (~124km) to Genesis’ Laverton Mill.
iv. Mine operating cash flow/(deficit) = Sales proceeds less cash operating costs, royalties and sustaining capital.
v. Net mine cash flow = Mine operating (cash flow) less growth capital (projects in production).
vi. Relates to Fish mine capital include start-up costs, expenditure on plant and equipment and mine development activities. Commercial production
refers to a period where the mine has operated as intended by management for a sustained period.
During the March quarter, the company continued to incur expenditure on development related to
advancing and de-risking the Goldfields Project development in-line with the project development
outlined in the DFS 2.0.
During the quarter, Brightstar invested $5.1 million in Sustaining Capital in the mining operations, with
$3.9 million directly attributable toward ‘Stage 2’ of the Fish mine plan, supporting future DFS 2.0 mining
activities (not current operations). Additionally, of the $3.2 million categorised as Growth Capital (projects
in production), $2.2 million was incurred on expansions to the Lord Byron/Fish mining camp required for
the processing plant construction crew and eventually the Lord Byron open pit mining workforce.
The Company incurred exploration and studies expenditure of $7.2 million and corporate expenditure
of $2.7 million for the March 2026 quarter.
30 Exploration Disclosures ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure during the Quarter was $7.8 million. ASX Listing Rule 5.3.2: Production and Development Expenditure during the Quarter was $24.3 million. ASX Listing Rule 5.3.3: The mining tenements held by the Company at the end of the quarter and their location are set out as a Schedule to this report.
14 April 2026 Clarification of production targets and aspirational statements
Brightstar Resources Limited (“Brightstar” or “the Company”) (ASX: BTR) refers to its investor presentation announced on 18 March 2026 (“Presentation”).
It has come to the Company’s attention that certain statements made in the Presentation may constitute production targets. The Company provides clarification below.
Evaluation of a 4–5Mtpa central processing facility for Sandstone and inclusion of the Sandstone project in production growth targets
Brightstar has previously disclosed that the Sandstone pre-feasibility study (PFS) is evaluating a processing plant for the project with a capacity in the range of 4-5Mtpa. The potential processing capacity was disclosed on the basis that Brightstar considered it to be material information regarding a future operation at Sandstone. The potential capacity does not, and was not intended to, infer a possible production profile.
Brightstar completed high-level order of magnitude assessments of possible processing plant capacities which informed this decision. This was assessed with regards to industry norms, conventional milling parameters, indicative potential capital costs, operating costs and in acknowledgment of Brightstar’s existing Mineral Resource Estimate of 51Mt @ 1.5g/t Au for 2.4Moz Au at Sandstone. Brightstar continues to evaluate the appropriate sizing of the Sandstone processing solution. Brightstar’s PFS will assess a wide range of processing capacities, including the potential for higher capacity and modular, scalable configurations.
It has come to our attention that the range of possible processing plant throughput outcomes (4-5Mtpa) is too specific and potentially constitutes predictions or potential targets from Brightstar. Accordingly, Brightstar withdraws its disclosure of the processing plant throughputs being assessed in the PFS until such time as it has completed the relevant studies and has sufficient reasonable grounds to support forecast information in relation to production from Sandstone and notes shareholders are not to rely on this information.
Brightstar had also included possible Sandstone production in its production growth target on the basis that Brightstar considers the forecast production from Sandstone to constitute an aspirational statement, rather than a production target. The aspirational potential indicated is a range with no specific production profile delineated, as illustrated in the graph. As disclosed in the Presentation, Brightstar has not yet completed the PFS for Sandstone and substantial further work is required before Brightstar will be in a position to have sufficient objective reasonable grounds to publish production targets or forecast financial information relating to the Sandstone project. As such the Company retracts the information disclosed, and investors are not to rely on this aspiration until such time as it has completed the relevant studies and has sufficient reasonable grounds to support forecast information in relation to production from Sandstone.
2
Table disclosing mill throughput (Mtpa) vs mill feed head grade (g/t Au)
Brightstar confirms that, as disclosed in the note included on slide 18, this table does not disclose any
production targets or other forecasts. Rather, it is a conceptual mathematical output based on varying mill
throughputs and head grades. It is not based on Brightstar’s Mineral Resources or any other information
specific to Brightstar and is provided for illustrative purposes only, as disclaimed. The Company retracts this
information, and investors are not to rely on this table as potential future production until such time as it has
completed the relevant studies and has sufficient reasonable grounds to support forecast information in
relation to production from Sandstone.
Growth targets for Mineral Resources and Ore Reserves estimates
Brightstar disclosed various statements in relation to growth targets for its existing Mineral Resources and
Ore Reserves estimates, including:
• “Long term MRE growth target of 3.0Moz – 4.0Moz”
• “PFS: Targeting maiden +1.0Moz Ore Reserve, supporting an initial 6-8 year mine life”
• “DFS: Targeting 1.5Moz – 2.5Moz Ore Reserve, supporting a +10 year mine life”
As disclosed in the “Aspirational Statements” footnote on slide 17, Brightstar considers that these statements are longer term aspirational statements. Investors were cautioned that the Company does not yet have reasonable grounds to believe that the statements can be achieved. In particular, Brightstar noted that the longer-term Ore Reserve growth target for the DFS is anticipated to be completed in 2027. Investors were directed to consider the detailed “Aspirational Statements” disclaimer on page 2 of the Presentation.
It has come to the Company’s attention that given the amount of work undertaken on the Sandstone project, in particular, the anticipated completion of the PFS this year and the sizeable existing Mineral Resource estimate of 2.4Moz @ 1.5g/t Au, the statements in relation to targeted Mineral Resource and Ore Reserves growth are too specific and potentially constitute predictions or potential targets from Brightstar about probable future outcomes, as opposed to purely aspirational statements.
Accordingly, Brightstar withdraws its disclosure of its targeted growth in Mineral Resources and Ore Reserves until such time as it has completed the relevant studies and has sufficient reasonable grounds to support forecast information in relation to production from Sandstone and shareholders must not rely on this information.
This ASX announcement has been approved by the Managing Director on behalf of the Board of Brightstar.
ENDS
3
INTERIM FINANCIAL REPORT ASX: BTR ABN: 44 100 727 491 FOR THE HALF - YEAR ENDED 31 DECEMBER 2025
Contents Directors’ Report 1 Auditor’s Independence Declaration 14 Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income 15 Condensed Consolidated Statement of Financial Position 16 Condensed Consolidated Statement of Changes in Equity 17 Condensed Consolidated Statement of Cash Flows 18 Notes to the Consolidated Financial Statements 19 Directors' Declaration 43 Independent Auditor’s Review Report 44
1
DIRECTORS’ REPORT
Your Directors present their report on the Group consisting of Brightstar Resources Limited (“Brightstar” or the “Company”)
and the entities it controlled (together the “Group”) at the end of, or during the half-year ended 31 December 2025.
DIRECTORS
The Directors of the Company who held office during the half-year and up to the date of this report are stated below.
Directors were in office for this entire period unless otherwise stated.
Mr Richard Crookes
Mr Alexander Rovira
Non-Executive Chairman
Managing Director
Mr Andrew Rich Executive Director - Operations
Mr Jonathan Downes Non-Executive Director
Mr Ashley Fraser Non-Executive Director (Resigned 2 December 2025)
REVIEW OF OPERATIONS
Key highlights of the Company’s operations during the half-year ended 31 December 2025 included:
•Fish mine ramp-up to achieve name-plate production in the month of September 2025
1
contributing to record
production for H1 FY26 of 157.5Kt ore mined at 2.93g/t for 14,848oz of contained gold from both the Second
Fortune and Fish operations.
•Two parcels processed through Genesis Minerals’ Laverton Mill processing a total of 134,352dmt @ 2.46g/t for
8,719oz of recovered gold.
•Strategic acquisition of Aurumin Limited
,2,3,4
consolidating the Sandstone region with a pro-forma Mineral
Resource of 2.4Moz @ 1.5g/t. Concurrently, Brightstar completed a $50 million capital raise (before costs) to
fund aggressive exploration and a Sandstone Pre-Feasibility Study due mid CY26.
•Mining approvals received for the Lord Byron Open Pit Mine
5
– the mine is ready for development and production
in H2 CY26.
•A Mineral Resource upgrade at the Lady Shenton and Yunndaga development projects (located within the
Goldfields Hub) increasing the Mineral Resource by 22%
6
.
•Release of Goldfields updated Definitive Feasibility Study (DFS 2.0)
7,8
which was subsequently released after the
reporting period on 29 January 2026 delivering upgraded economic outcomes including an undiscounted pre-tax
free cash flow of $1.0 billion, NPV
8
of $606 million and IRR of 74% at an assumed Base Case of A$6,000/oz.
•Subsequent to the reporting period the Company announced a successful $175 million capital raising (before
costs) via a two-tranche placement and a Share Purchase Plan to raise an additional circa $5 million (before
costs)
8,9
.
OPERATIONS
Safety
Safety performance continued to be strong across the Group, with no Lost Time Injuries (LTIs) extending the Group’s LTI-
free record to over 2,099 days.
During the half-year, Brightstar rolled out its Company Values with the launch targeting a high impact rollout to our
employees, and to establish a visual legacy for current and future employees.
2 Production and Sales Second Fortune and Fish Unit SepQ 2025 ii DecQ 2025 DecHY 2025 Production Development ore: Ore mined kt 33.0 30.8 63.8 Grade mined g/t Au 3.01 2.27 2.65 Contained gold oz 3,192 2,246 5,438 Stope ore: Ore mined kt 36.2 57.6 93.8 Grade mined g/t Au 3.27 3.03 3.12 Contained gold oz 3,810 5,600 9,409 Total ore mined: Ore mined kt 69.2 88.3 157.5 Grade mined g/t Au 3.15 2.76 2.93 Contained gold oz 7,002 7,846 14,848 Sales Ore sold kt 51.2 82.5 133.7 Grade g/t Au 2.34 2.72 2.57 Contained gold oz 3,857 7,200 11,057 Recovery i % 80% 78% 79% Recovered gold oz 3,072 5,618 8,690 Average price received A$/oz 5,860 6,247 6,111 Inventory (at period end): Ore kt 157.2 161.6 161.6 Grade g/t Au 1.13 1.12 1.12 Contained gold oz 5,713 5,805 5,805 i.Estimated recoveries between ore sources are reconciled based on historical processing records and test work. ii. The September quarter is restated to allocate the adjustment relating to final physicals and average price received during the December quarter and relating to the September quarter following finalisation of the processing reconciliations in the December quarter.
3
Second Fortune Gold Mine
Second Fortune mined a total of 63,622t @ 3.04 g/t Au for 6,213 oz of contained gold during the half-year, comprised of:
o15,678t @ 3.27 g/t Au of development ore; and
o47,945t @ 2.96 g/t Au of stope ore.
Total development for the half-year was 1,228 meters consisting of 270 meters of Decline, 166 metres of capital and 792
meters of operating development.
Development activities focussed on the 1015, 995 and 975 levels, with stoping occurring on the 1030, 1015 and 995 levels.
In June 2025, Brightstar discovered the ‘FTV Lode’
10,11,12
on the 1015 level as a potentially material extension to the main
Second Fortune ore body. Previously, mining at Second Fortune was constrained by the "Northern Fault" which
represented the lateral extent of the mineralisation to the north. Development and stoping activities commenced on this
lode followed by the commencement of diamond drilling in December 2025 to further define the lode down dip.
Figure 1: Second Fortune Gold Mine.
In September 2025, Brightstar took delivery of two zero hour rebuilt CAT 1300 loaders, further bolstering the fleet and
increasing reliability.
Fish Mine
Fish mined a total of 93,905t @ 2.86 g/t Au for 8,634oz of contained gold during the half-year, comprised of:
o48,076t @ 2.45 g/t Au of development ore; and
o45,829t @ 3.29 g/t Au of stope ore.
Total development for the half-year was 1,644 meters consisting of 402 meters of Decline, 574 meters of capital and 668
meters of operating development.
4
The Fish mine commenced ramp up from construction, achieving first production stoping in August 2025 followed by steady
state production of Stage 1 in September 2025
1
from an owner-operator mining model.
The project ramped up to steady state on schedule and under budget, with no LTI’s occurring during the half-year.
Underground diamond drilling commenced in August 2025 to target ‘Stage 2’ mine life extensions, with the drilling being
completed late November 2025.
Processing
Two processing campaigns were completed through Genesis Minerals’ Laverton Mill, processing a total of 134,352dmt @
2.46g/t Au for 8,719oz recovered gold.
Parcel 3, processed in August (delivered between 21 May 2025 to 5 August 2025), achieved 52kt @ 2.68g/t Au with 91.3%
recovery for 4,067oz.
Parcel 4, processed in November (delivered between 6 August 2025 to 15 November 2025), Brightstar’s largest to date,
achieved 83kt @ 2.32g/t Au with 75% recovery for 4,652oz. Brightstar identified sub-optimal leaching conditions for the
Parcel 4 processing campaign, which adversely affected the parcel’s recoveries. Parcel 4 contained an increased
proportion of Pyrrhotite-bearing Fish ore in the blended parcel, which contributed to conditions of low dissolved oxygen
levels in the leaching circuit. Amending the blend composition of the ore delivered into Parcel 5 and revising milling
operating parameters is targeted to deliver an enhanced result in Parcel 5, due in Q1 2026
Brightstar’s fifth and final campaign through Genesis’ Laverton Mill is scheduled for Q1 2026.
STUDIES
Definitive Feasibility Study (Menzies and Laverton)
7,8
On 29 January 2026 the Company released an updated Definitive Feasibility Study (DFS) for the Goldfields (Menzies and Laverton) Project (DFS 2.0) with significant improvement to the metrics of the original DFS released in June 2026. DFS 2.0 captures enlarged Mineral Resources and a transition from the previous Menzies toll milling strategy to a consolidated Laverton processing strategy enabling an improved production profile, mine life and economics.
5 Key highlights of DFS 2.0 include: -Undiscounted pre-tax free cash flow of $1.0 billion, NPV 8 of $606 million and IRR of 74% at an assumed Base Case of A$6,000/oz; -Undiscounted pre-tax free cash flow of $1.4 billion, NPV 8 of $911 million and IRR of 106% at a spot price of A$7,000/oz; -Initial mine production of approximately 9.4Mt @ 1.7g/t Au for 457,000 recovered ounces over approximately six years; -Base Case C1 Cash Costs of A$2,581/oz and All-In Sustaining Costs (AISC) of $2,998/oz; and -Processing plant throughput right-sized to 1.5Mtpa (up from 1.0Mtpa previously) which increases average gold production to +75koz per annum with strong potential to increase mine life with continued exploration of existing Mineral Resources and the plant designed with capability to enable expansion to 2.5Mtpa in the future. The Company continues to advance project financing and pre-development activities with the aim of declaring a Final Investment Decision in the March 2026 quarter. Pre-Feasibility Study (Sandstone) 1
The Sandstone Pre-Feasibility Study (PFS) commenced in the September 2025 quarter with the December quarter focusing on pit optimisation work and on-going Mineral Resources Estimate updates. A number of the open pits are in various states of analysis, with multiple workstreams ongoing regarding metallurgical, geotechnical, mining and scheduling. Key PFS workstreams advancing include: • metallurgical assessments to confirm gold recovery rates; • geotechnical assessments to confirm open pit stability and optimal pit wall angles to drive strip ratios; • open pit mine optimisations to inform drilling program planning; • capital infrastructure requirements; • processing infrastructure design; and • permitting and approvals activities to support the redevelopment of the Sandstone Gold Project. The Company is advancing a PFS targeting completion in 2H CY26, with preliminary assessments suggesting a 4.0– 5.0Mtpa processing plant located in Sandstone will likely optimise operational and financial outputs. EXPLORATION Menzies Yunndaga 13
A total of 31 drill holes for ~6,600m were drilled at the Yunndaga deposit in the half-year. The drilling comprised 17 RC holes, 10 RC holes with diamond core tails, and four diamond core holes drilled from surface. The diamond core component of the program, totalling ~1,600m, also provided important geotechnical data and metallurgical sample material to help progress the development workstreams at the deposit. The drilling program aimed to infill the Mineral Resource in areas optimised for underground mining, stepping out from the initial intercepts and testing for extensions at depth and to the north. Significant results were received including: •7m @ 5.70g/t Au from 230m in YNRCD25040, including 0.6m @ 54.8g/t Au from 234.8m •10.6m @ 2.28g/t Au from 217m in YNDD25003, including 1.1m @ 11.9g/t Au from 225.6m Laverton Second Fortune Mine & Regional Targets 14
During the half-year, a total of 29 RC holes for ~4,800m were drilled at the Second Fortune Mine and several regional prospects. Significant RC results from the drilling program included: •10m @ 9.83g/t Au from 57m, including 1m @ 56.9g/t Au from 62m in SFRC25012
6 •7m @ 2.30g/t Au from 47m in SFRC25013 •1m @ 53.8g/t Au from 83m in SFRC25020 •1m @ 13.7g/t Au from 54m in SFRC25014 Fish Deposit – Surface Drilling 14
The surface exploration drilling program at Fish consisted of 8 holes totalling ~2,700m. Five holes consisted of an RC pre-
collar holes with a diamond tail, with three RC-only holes.
The extensional program predominantly targeted the extents of the orebody at depth and along strike to the south. Three
RC-only holes were drilled targeting the upper zones of the deposit, including southern extensions to the ore drives.
Significant RC results from the drilling program included:
•5m @ 2.64g/t Au from 120m in FHRC25001
•4.0m @ 2.42g/t Au from 544.0m, including 1.0m @ 4.05g/t Au from 547.0m in FHRCD25005C
•2m @ 3.65g/t Au from 144m in FHRC25002
Fish Deposit - Underground Diamond Drilling
14
Underground drilling was designed to target infill and extensional holes to Brightstar’s ‘Stage 2’ conceptual mine plan,
which sits below the current Ore Reserve and current mine plan. The drilling program, to be completed in two phases,
includes a substantial drill-out of deeper mineralisation targeting the conversion of Inferred Mineral Resources beneath the
existing mine plan into Measured/Indicated classification to enable the delineation of Ore Reserves and inclusion in future
mine plan extensions.
The ongoing Phase 1 program totals ~5,400m and targets the infill and strike extensions to the central portions of the
conceptual ‘Stage 2’ mine design, with a further ~4,000m of drilling focused on Mineral Resource extensions at depth and
potential parallel lodes to the main zone.
Assay results included:
•7.0m @ 3.31g/t Au from 141.6m in FUDD002 (Main Zone)
•6.3m @ 2.35g/t Au from 198.5m in FUDD008 (Main Zone)
•3.2m @ 4.51g/t Au from 209.4m in FUDD001A (Hangingwall Zone)
•9.9m @ 2.90g/t Au from 179.5m in FUDD002 (Hangingwall Zone)
Lord Byron (Jasper Hills Project)
15
Lord Byron is located 10km west of Brightstar’s Fish mine at the Jasper Hills Project, and approximately ~50km from the
site of Brightstar’s proposed new 1.5Mtpa CIL processing plant.
As at the end of the half-year period, the Lord Byron deposit hosted a Mineral Resource of 251koz @ 1.5g/t Au. Drilling
during the half-year period tested an area of Inferred Mineral Resource within and to the south of the optimised pit shell,
aiming to infill the ore body to enable potential addition to future Ore Reserves.
The results far exceeded the expected intersections with wide zones of high-grade material intersected just below the
optimised pit shell and defined Inferred Mineral Resource boundary.
Assay results include:
•32m @ 7.16g/t Au from 69m, including 11m @ 15.1 g/t Au from 87m, and 11m @ 3.13g/t Au from 53m in
LBRC25001
•30m @ 3.02g/t Au from 44m, including 1m @ 15.2 g/t Au from 70m and 2m @ 5.04g/t Au from 78m in
LBRC25005
•8m @ 2.52g/t Au from 42m in LBRC25014
7
Sandstone
During the half-year, drilling campaigns were conducted at Indomitable Camp (Musketeer, Indomitable East & Cessna),
Lords Camp, Lords Corridor, Hacks West, Havilah, Bulchina, Bull Oak, Duplex and Whistler (Figure 2).
Figure 2: Sandstone Project Prospect and Deposit locations.
Musketeer
16
The Musketeer deposit has a current Inferred Mineral Resource of 1.4Mt at 1.3g/t gold for 59koz, with 0.8Mt at 1.5g/t Au
for 40koz gold, located within a conceptual pit shell optimised at a conservative gold price of $2,500 AUD/oz.
A total of 61 RC drillholes for ~6,500m were drilled at Musketeer during this campaign targeting both resource upgrades
and potential extensions. The results from infill drillholes inside the conceptual pit shell continue to highlight the strong
continuity of gold mineralisation across the entire deposit.
Significant assay results returned from drilling included:
•7m @ 2.28g/t Au from 29m, including 1m @ 7.69g/t Au from 30m in INRC25082
•6m @ 3.47g/t Au from 94m, including 2m @ 7.68g/t Au from 94m in INRC25081
•8m @ 4.50g/t Au from 95m, including 1m @ 19.5g/t Au from 99m in INRC25086
Lords Camp
16
The Lord Henry deposit forms part of the Lords Camp, which hosts a total MRE of 7.8Mt @ 1.5g/t Au for 389koz Au across
the Lord Nelson and Lord Henry deposits.
The program during the half-year of 11 drill holes for ~1,360m targeted extensions to mineralisation along strike to the west
outside the current mineral resource.
Significant assay results returned from the current RC extensional drilling program include:
•3m @ 9.29g/t Au from 55m, including 1m @ 25.1g/t Au from 55m; and
•4m @ 19.3g/t Au from 98m, including 1m @ 58.5g/t Au from 99m in LHRC25008
•3m @ 2.66g/t Au from 92m, including 1m @ 4.69g/t Au from 92m in LHRC25004
8 Havilah 17,18
A total of 17 RC holes were drilled for ~3,200m at Havilah. In addition, two short diamond holes were drilled (220m total),
primarily for structural, geotechnical and metallurgical purposes.
Significant intercepts from the drilling include:
•5m @ 12.8g/t Au from 142m in HVRC25015
•4m @ 17.4g/t Au from 110m in HVRC25008, including 1m @ 61.2g/t Au from 111m
Bull Oak
18
The Bull Oak deposit hosts a current MRE of 90koz @ 1.1g/t Au, limited by sparse drilling below 100m depth.
Mineralisation is hosted by sheeted, shallowly east-dipping veins sets within a granodiorite intrusion, with further
mineralisation hosted by banded iron units (BIFs) truncated by the intrusion.
The drilling program completed in the half-year aimed to test beneath the existing Mineral Resource, primarily targeting
the granodiorite-hosted vein lodes to assess continuity for potential future resource upgrades.
A total 9 RC holes were completed for ~2,100m of drilling.
A total of three diamond drillholes have been completed for 830m, with further drilling ongoing. Assays were pending for
all diamond holes at the end of the half-year.
Assay results for these zones include:
•3m @ 31.40g/t Au from 130m in BORC25006
•10m @ 5.83g/t Au from 11m, including 1m @ 16.7g/t Au from 15m in BORC25013
•9m @ 4.44g/t Au from 162m, including 1m @ 29.9g/t Au from 162m in BORC25010
The high-grade intervals were typically present within wide haloes of lower grade material. Significant intercepts for these
wide zones include:
•157m @ 1.13g/t Au from 18m in BORC25006
•168m @ 0.40g/t Au from 32m in BORC25012
•73m @ 1.14g/t Au from 11m in BORC25014
Drilling is ongoing at Bull Oak targeting infill of the area beneath the existing MRE, in order to delineate the mineralised
lodes and facilitate a Mineral Resource update incorporating these extensions.
Duplex (Montague Project)
16
The Duplex prospect is located approximately 3.5km south of the Montague-Boulder Deposit in the Montague Project,
approximately 70km north-east of Sandstone.
In the half-year period, a drilling program of 14 drill holes for ~2,300m was completed targeting extensions to high-grade
mineralisation intersected in previous drilling.
Significant assay results returned from RC drilling include;
•2m @ 5.87g/t Au from 177m, including 1m @ 11.0g/t Au from 177m in DXRC25001
•5m @ 2.71g/t Au from 154m, including 1m @ 9.93g/t Au from 156m in DXRC25008
9
MINERAL RESOURCE ESTIMATE UPDATE
During the half-year, infill and extensional drilling conducted at the Menzies Gold Project in 2025 resulted in Mineral
Resource Estimate (MRE) updates at the key Yunndaga and Lady Shenton deposits, significantly improving the quality of
the Mineral Resources.
This MRE estimation process is the first time Yunndaga and Lady Shenton have been estimated in-house by Brightstar,
with a focus on delivering robust Mineral Resources to underpin future mining operations.
The MRE for the Menzies Project was increased 22% to 14.8Mt @ 1.5g/t Au for 718,000oz Au. Importantly, the key
deposits of Lady Shenton and Yunndaga increased in size by 29% and 32%, respectively.
CORPORATE
Operating Result
The following table provides additional information on the Company’s result for the half-year ended 31 December 2025
and specifically reconciles the cash gross margin/(loss)
1
to the net loss for the half-year.
1
The cash gross margin/(loss) is a non-IFRS measure that in the opinion of the Company’s directors provides useful information to assess
the financial performance of the Company over the reporting period. This non-IFRS measure is unaudited.
2
Operating cost of sales includes mining, inventory movements, haulage, royalties and site based general and administration costs.
The cash gross margin from operations of $10.1 million (31 December 2024: cash gross loss of $0.3 million) i s below
expectations following the lower than anticipated recovery from processing of Parcel 4 following sub-optimal leaching levels
achieved during this
processing campaign. Due to the impact on recoveries in this parcel, the net effect of this was an
underperformance of approximately 1,650 recovered ounces compared to management forecasts based on the mined
production and forecast metallurgical recoveries. Commensurately, this reduced revenue from sales by
approximately $10.5 million which negatively impacted the operating margin for the half-year.
31-Dec-25
31-Dec-24
$'000
$'000
Revenue from contracts with customers
38,729
2,165
Operating cost of sales
2
(28,657)
(2,463)
Cash gross margin/(loss)
1
10,072
(298)
Depreciation and amortisation
(14,988)
(1,333)
Gross margin/(loss)
(4,916)
(1,631)
Administration and other expense
(4,858)
(3,172)
Exploration and feasibility studies expense
(22,415)
(9,531)
Depreciation and amortisation expense
(161)
(121)
Inventory write down
(3,555) Share based payment expense (1,275) (1,121) Business acquisition income/(expense) (269) (186) Other income 27 1,499 Operating margin/(loss) before finance costs (33,867) (17,818) Finance income 334 145 Finance costs (2,800) (800) Revaluation of financial assets to fair value (342) (2,447) (Loss) after tax (36,675) (20,920)
10
This will be addressed in Parcel 5 (scheduled to be processed during Q1 2026) by amending the blend composition of the
ore delivered into the parcel and assessing milling operating parameters.
During H1 FY26 the Company incurred exploration and feasibility expenses of $22.4 million (31 December 2024: $9.5
million) including a non-cash expense of $9.3 million (31 December 2024: nil) relating to the uplift of the rehabilitation
provision associated with an exploration stage asset.
Cash and Liquidity
During the half-year, the Company increased its cash balance by $11.4 million to $23.0 million (30 June 2025: $11.7
million). Contributing to the movement in cash and cash equivalents during the period were cash inflows from financing
activities of $45.5 million, cash outflows from operating activities of $17.1 million and cash outflows from investing activities
of $17.0 million. Significant cash flows are shown in the graph below:
During the half-year the Company put in place 18,131 ounces of put options between $4,950/oz and $4,750/oz with
settlement dates between 26 November 2025 and 28 April 2026. As at 31 December 2025, unexpired option premiums
total 5,507 ounces at a strike price of $4,750/oz (30 June 2025: Nil).
Acquisition of Aurumin Limited
On 2 December 2025 the Company completed its acquisition of Aurumin Limited (Aurumin) via a Share and Option Scheme
of Arrangement (together the Schemes). As part of the Schemes the Company issued 128.0 million Shares to Aurumin
shareholders (being one Brightstar Share for every four Aurumin Shares held) and 28.1 million Options to Aurumin Option
holders (being one new Brightstar Option for every four Aurumin Options held).
The acquisition of Aurumin further consolidates the Sandstone region following Brightstar’s acquisition in late 2024 of the
Sandstone Gold Project via the acquisition of Alto Metals Ltd and the Montague Project acquired from Gateway Mining
Ltd. Together these acquisitions represent a unique opportunity to de-risk and accelerate the development of the emerging
Sandstone Gold district, provide greater certainty for the development of new infrastructure in the region and unlock
exploration synergies.
Capital Raising Activities
On 21 July 2025 the Company announced receipt of binding commitments for a share placement raising $50 million (before
costs) from institutional and sophisticated investors to fast-track exploration and development activities at the Sandstone
Gold district, 104.2 million shares were issued on 25 July 2025.
Board Changes
On 2 December 2025 Mr Ashley Fraser resigned as a Non-Executive Director of the Company.
11
Earn-In Arrangements
In February 2025, Brightstar signed a binding Term Sheet with Cazaly Resources Limited (Cazaly) under which Cazaly is
granted an option to elect to earn up to an 80% interest in the Goongarrie Gold Project by sole funding exploration
expenditure of up to $3 million.
In March 2025, Cazaly exercised this option, with the staged earn-in structure being:
•Cazaly to spend $1 million on expenditure over an initial 12-month period to earn a 25% interest;
•Cazaly to spend an additional $1 million on expenditure over a further 18-month period to earn an additional
26% interest (aggregate 51% interest); and
•Cazaly to spend an additional $1 million on expenditure over a further 18-month period to earn an additional
29% interest (aggregate 80% interest).
On 20 January 2026 Cazaly met the first expenditure milestone of $1 million expenditure earning a 25% interest in the
Goongarrie Gold Project.
References
1.Refer Brightstar Resources announcement dated 31 October 2025 “September 2025 Quarterly Activity Report”
2.Refer Brightstar Resources announcements dated 21 July 2025 “Brightstar Pursues Synergistic Consolidation at
Sandstone” and “Brightstar-Aurumin Sandstone Consolidation Presentation”
3.Refer Brightstar Resources announcement dated 20 November 2025 “Aurumin Scheme Approved – Group MRE
Grows to 3.9Moz Au”
4.Refer Brightstar Resources announcement dated 2 December 2025 “Implementation of Schemes”
5.Refer Brightstar Resources announcement dated 22 September 2025 “Mining Approvals Received for Lord Byron
Open Pit Mine
6.Refer Brightstar Resources announcement dated 11 December 2025 “Menzies Mineral Resource increases 22%
to 0.7Moz @ 1.5g/t
7.Refer Brightstar Resources announcement dated 29 January 2026 “Updated Goldfields Feasibility Study” and
“Updated Goldfields DFS Presentation”
8.Refer Brightstar Resources announcement dated 2 February 2026 “Strategic $180 Capital Raising Funds
Goldfields Development”
9.Refer Brightstar Resources announcement dated 10 February 2026 “SPP Opens – Letter and Offer Booklet”
10.Refer Brightstar Resources announcement dated 17 July 2025 “Operations Update with Mine Production Up 25%
QoQ”
11.Refer Brightstar Resources announcement dated 31 July 2025 “June 2025 Quarterly Activity Report”
12.Refer Brightstar Resources announcement dated 2 December 2025 “Laverton Mines Deliver Record Processing
Campaign”
13.Refer Brightstar Resources announcement dated 21 October 2025 “High-Grade Gold Assays Returned in
Diamond Drilling at the Menzies Gold Project”
14.Refer Brightstar Resources announcement dated 12 November 2025 “High-Grade Extensional Drilling Results at
Second Fortune and Fish Targeting Mine Life Extensions”
15.Refer Brightstar Resources announcement dated 10 September 2025 “32m @7.16g/t Au from 69m in Lord Byron
RC Drilling Below Optimised Open Pit Design”
16.Refer Brightstar Resources announcement dated 20 August 2025 “Further Strong Gold Results from Extensional
and Infill Drilling at the Sandstone Gold Project”
17.Refer Brightstar Resources announcement dated 3 July 2025 “Significant Assay Results From Early-Stage
Growth Exploration Drilling at the Sandstone Hub
18.Refer Brightstar Resources announcement dated 9 December 2025 “High-Grade Intercepts Continue in Latest
Drilling Results from Sandstone”
FORWARD LOOKING STATEMENTS
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Brightstar Resources Limited’s planned exploration program and other statements that are not
historical facts. When used in this document, the words such as "could," "plan," "expect," "intend," "may”, "potential,"
"should," and similar expressions are forward-looking statements. Although Brightstar believes that its expectations
reflected in these forward- looking statements are reasonable, such statements involve risks and uncertainties and no
assurance can be given that further exploration will result in the estimation of a Mineral Resource.
COMPETENT PERSON STATEMENT
The information presented here relating to exploration of the Menzies, Laverton and Sandstone Gold Project areas are
based on information compiled by Mr Michael Kammermann, MAIG. Mr Kammermann is a Member of the Australasian
Institute of Geoscientists (AIG) and has sufficient experience relevant to the style of mineralisation and type of deposit
12 under consideration and to the activity he is undertaking to qualify as a “Competent Person” as that term is defined in the 2012 Edition of the “Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012)”. Mr Kammermann is a fulltime employee of the Company in the position of Exploration Manager and has provided written consent approving the inclusion of the Exploration Results in the form and context in which they appear. Competent Person Statement – Mineral Resource Estimates The information in the report to which this statement is attached that relates to Mineral Resources at the Menzies Gold Project (specifically the Lady Shenton and Yunndaga deposits) is based on information compiled or reviewed by Mr Graham de la Mare, a Competent Person who is a Fellow of the Australian Institute of Geoscientists. Graham de la Mare is a full-time employee of Brightstar Resources and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Results, Mineral Resources and Ore Reserves’. Graham de la Mare consents to the inclusion in this announcement of statements based on this information in the form and context in which it appears. This Announcement contains references to Brightstar’s JORC Mineral Resource estimates, extracted from the ASX announcements titled “Cork Tree Well Resource Upgrade Delivers 1Moz Group MRE” dated 23 June 2023, “Maiden Link Zone Mineral Resource” dated 15 November 2023, "Aspacia deposit records maiden Mineral Resource at the Menzies Gold Project” dated 17 April 2024, “Brightstar Makes Recommended Bid for Linden Gold”, dated 25 March 2024, “Brightstar to drive consolidation of Sandstone Gold District” dated 1 August 2024 and “Scheme Booklet Registered by ASIC” dated 14 October 2024, “Robust Mineral Resource Upgrades at Laverton and Menzies Underpins Future Mining Operations” dated 19 May 2025 , “Menzies and Laverton Gold Projects Feasibility Study” dated 30 June 2025, “Brightstar pursues logical consolidation at Sandstone Hub” dated 18 July 2025 and “Significant Growth in Menzies Mineral Resource” dated 11 December 2025. Brightstar confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the Mineral Resource estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements. COMPLIANCE STATEMENT With reference to previously reported Exploration Results and Mineral Resources, the Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement. SIGNIFICANT CHANGES Other than disclosed in this Directors’ report, there have been no significant changes in the state of affairs of the Group during the period. EVENTS SUBSEQUENT TO REPORTING DATE On 29 January 2026, the Company announced the completion and release of an updated Definitive Feasibility Study (DFS 2.0) in respect of the Goldfields Gold Project. DFS 2.0 captures enlarged Mineral Resources and a transition from the previous Menzies toll milling strategy to a consolidated Laverton processing strategy enabling an improved production profile, mine life and economics while removing third party processing risk. The undiscounted pre-tax free cash flow of DFS 2.0 is $1.0 billion, NPV 8 of $606 million and IRR of 74% at an assumed Base Case of A$6,000/oz. On 2 February 2026, the Company announced a capital raising with binding commitments of $175 million (before costs) via a two-tranche placement to tier one, long only international and domestic institutional investors (350 million shares at $0.50 per share). On 10 February 2026, the Company issued Tranche 1 shares of 105.6 million at $0.50 per share and received proceeds of $52.8 million (before costs). The second tranche (244.4 million shares at $0.50 per share for gross proceeds of $122.2 million) is subject to shareholder approval scheduled to take place at a General Meeting of Shareholders on 10 March 2026.
13
RESULTS OF OPERATIONS
The Company’s consolidated loss after tax for the year ended 31 December 2025 was $36.7 million (31 December 2024:
loss of $20.9 million). The Company’s basic loss per share for the period ended 31 December 2025 was $0.06 per share
(31 December 2024: loss of $0.07 per share).
DIVIDENDS
No dividends have been paid or declared since the start of the financial year and the directors do not recommend the
payment of a dividend in respect of the reporting period.
ROUNDING OF AMOUNTS
The Company is of a kind referred to in Corporations Instrument 2016/191, issued by the Australian Securities and
Investments Commission, relating to “rounding-off”. Amounts in this report have been rounded off in accordance with that
Corporations Instrument to the nearest thousand dollars, unless otherwise stated.
AUDITOR’S INDEPENDENCE DECLARATION
The auditor’s independence declaration is set out on page 14 for the half-year ended 31 December 2025.
Signed in accordance with a resolution of the Board of Directors.
Richard Crookes
Chairman
27 February 2026
KPMG, an Australian partnership and a member firm of the KPMG global organisation of independent member firms affiliated
with KPMG International Limited, a private English company limited by guarantee. All rights reserved. The KPMG name and logo
are trademarks used under license by the independent member firms of the KPMG global organisation. Liability limited by a
scheme approved under Professional Standards Legislation.
Lead Auditor’s Independence Declaration under
Section 307C of the Corporations Act 2001
To the Directors of Brightstar Resources Ltd
I declare that, to the best of my knowledge and belief, in relation to the review of the interim financial
report of Brightstar Resources Ltd for the half-year ended 31 December 2025 there have been:
i.no contraventions of the auditor independence requirements as set out in the Corporations Act
2001 in relation to the review; and
ii.no contraventions of any applicable code of professional conduct in relation to the review.
KPMG Glenn Diedrich
Partner
Perth
27 February 2026
14
15 CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME For the period ended 31 December 2025 Note December 2025 December 2024 $’000 $’000 Revenue from continuing operations 3 38,729 2,165 Cost of sales 4 (43,645) (3,796) Gross (loss) (4,916) (1,631) Other income 27 1,499 Administration and other expenses 5(a) (4,858) (3,172) Exploration expenditure (22,415) (9,531) Depreciation and amortisation expense (161) (121) Loss on revaluation of financial instruments at fair value through profit and loss 19 (342) (2,447) Share-based payments expense 18 (1,275) (1,121) Business acquisition expense (269) (186) Inventory write-down to net realisable value - (3,555) Operating (loss) (34,209) (20,265) Finance income 5(b) 334 145 Finance costs 5(b) (2,800) (800) Net financing (loss) (2,466) (655) (Loss) before income tax expense (36,675) (20,920) Income tax benefit - - (Loss) after income tax for the period (36,675) (20,920) Total comprehensive (loss) for the period attributable to the members of the parent (36,675) (20,920) (Loss) per share for the period attributable to the members of the parent: December 2025 December 2024 (restated) Basic (loss) per share (cents) 6 (0.06) (0.07) Diluted (loss) per share (cents) 6 (0.06) (0.07) The Consolidated Statement of Profit or Loss and Other Comprehensive Income should be read in conjunction with the notes to the financial statements.
16
CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION As at 31 December 2025
Note December 2025 June 2025
$’000 $’000
Current Assets
Cash and cash equivalents
23,044 11,664 Trade and other receivables 7 18,841 12,307 Inventories 8 9,406 1,186 Total Current Assets
51,291 25,157
Non-Current Assets
Property, plant and equipment 9 68,683 65,825
Deferred exploration and evaluation
expenditure
10 206,042 129,238
Total Non-Current Assets 274,725 195,063
Total Assets 326,016 220,220
Current Liabilities
Trade and other payables 12 38,704 31,286
Lease liabilities 13 4,925 5,336
Borrowings 14 21,505 16,880
Provisions 15 1,238 899
Total Current Liabilities 66,372 54,401
Non-Current Liabilities
Lease liabilities 13 7,367 8,132
Borrowings 14 850 625
Provisions 15 23,967 10,890
Total Non-Current liabilities 32,184 19,647
Total Liabilities 98,556 74,048
Net Assets 227,460 146,172
Equity
Issued capital 16 364,411 255,011
Accumulated losses (156,203) (119,528)
Reserves 17 19,252 10,689
Total Equity 227,460 146,172
The Consolidated Statement of Financial Position should be read in conjunction with the notes to the financial statements.
17
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY For the period ended 31 December 2025
Note Issued Capital Accumulated Losses Reserves Total
$’000 $’000 $’000 $’000 At 1 July 2024 108,861 (73,460) 9,541 44,942 Loss for the period - (20,920) - (20,920) Total comprehensive profit for the period after tax - (20,920) - (20,920) Issue of share capital 142,118 - - 142,118 Share issue costs (2,714) - - (2,714) Share-based payments 18 - - 1,121 1,121 At 31 December 2024 248,265 (94,380) 10,662 164,547 At 1 July 2025 255,011 (119,528) 10,689 146,172 Loss for the period - (36,675) - (36,675) Total comprehensive loss for the period after tax - (36,675) - (36,675) Issue of share capital 16 112,550 - - 112,550 Share issue costs 16 (3,150) - - (3,150) Share-based payments 18 - - 8,563 8,563 Balance at 31 December 2025 364,411 (156,203) 19,252 227,460
The Consolidated Statement of Changes in Equity should be read in conjunction with the notes to the financial statements.
Brightstar Resources Limited
18
CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS For the period ended 31 December 2025
Note December 2025 December 2024
$’000 $’000
Cash flows from operating activities
Receipts from customers 40,381 2,254
Payments to suppliers and employees
(45,384) (17,977) Payment for exploration expenditure (12,460) (9,293) Other income 2 145 Interest received
334 124 Net cash used in operating activities
(17,127) (24,747)
Cash flows from investing activities
Proceeds from sale of property, plant and equipment - 840
Payments for property, plant and equipment (16,459) (9,115)
Payments for acquisition of exploration assets (1,081) (5,314)
Cash acquired on acquisition of subsidiary 11 960 733
Payments to acquire financial assets (455) -
Net cash used in investing activities (17,035) (12,856)
Cash flow from financing activities
Proceeds from issue of shares 50,000 54,000
Share issue costs (3,150) (2,714)
Proceeds from borrowings 36,756 4,213
Repayment of borrowings (32,026) (3,255)
Borrowing costs (1,303) -
Interest paid on debt and leases (1,874) (548)
Principal element of lease payments (2,861) (787)
Net cash inflow from financing activities 45,542 50,909
Net increase in cash held 11,380 13,306 Cash and cash equivalents at beginning of the period 11,664 7,961 Cash and cash equivalents at end of the period 23,044 21,267
The Consolidated Statement of Cash Flows should be read in conjunction with the notes to the financial statements.
19
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE PEIORD ENDED 31 December 2025
NOTE 1: BASIS OF PREPARATION OF THE HALF-YEAR FINANCIAL REPORT
This half-year financial report covers the Company and its controlled entities as a consolidated entity (the Group). Brightstar Resources Limited is a company limited by shares, incorporated and domiciled in Australia. The address of the Company’s registered office and principal place of business is L2, 36 Rowland Street, Subiaco WA 6008. The Company is a for-profit entity for the purpose of preparing the financial statements.
The half-year financial report was authorised for issue by the directors as at the date of the directors’ report.
This condensed consolidated half-year financial report (“half-year financial report”) does not include all the notes of the type usually included in an annual financial report.
It is recommended that this half-year financial report be read in conjunction with the annual financial report for the year ended 30 June 2025 and any public announcements made by Brightstar Resources Limited (the Company) during the half- year ended 31 December 2025 (“interim period”) in accordance with any continuous disclosure obligations arising under the Corporations Act 2001.
Basis of preparation
These general purpose interim financial statements for the half-year ended 31 December 2025 have been prepared in accordance with the requirements of the Corporations Act 2001 and Australian Accounting Standard AASB 134 “Interim Financial Reporting”. Compliance with AASB 134 ensures compliance with International Accounting Standard 34 “Interim Financial Reporting”.
The financial statements are presented in Australian Dollars, which is the Group’s presentation currency.
The accounting policies applied in this half-year financial report are consistent with those of the annual financial report for the year ended 30 June 2025.
Rounding of amounts
The Company is of a kind referred to in Corporations Instrument 2016/191, issued by the Australian Securities and
Investments Commission, relating to “rounding-off”. Amounts in this report have been rounded off in accordance with that
Corporations Instrument to the nearest thousand dollars, unless otherwise stated.
20
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 1: BASIS OF PREPARATION OF THE HALF-YEAR FINANCIAL REPORT (CONT.)
Going Concern The financial report has been prepared on a going concern basis, which assumes that the Group will continue in operation for the foreseeable future.
The Group has recorded a net loss of $36.7 million (31 December 2024: net loss of $20.9 million), reported a cash outflow from operating activities of $17.1 million (31 December 2024: outflows of $24.7 million) and as of 31 December 2025 cash and cash equivalents of $23.0 million (30 June 2025: $11.7 million). The net assets of the Group as at 31 December 2025 were $227.5 million (30 June 2025: $146.2 million).
The Directors have prepared a cash flow forecast for the period ending 30 June 2027. It is recognised that additional funding is required either through the issue of further shares, debt funding, or the sale of assets or a combination of these activities for the Group to make a Final Investment Decision on the Goldfields Project Definitive Feasibility Study (DFS 2.0) and to continue exploration and development activities .
The Directors have reviewed the business outlook and the assets and liabilities of the Group and are of the opinion that the
use of the going concern basis of accounting is appropriate. The following factors have been taken into consideration by
the directors:
• On 2 February 2026, the Company announced a capital raising with binding commitments of $175 million (before
costs) via a two-tranche placement (350 million shares at $0.50 per share) to fund equity requirements for the
Goldfields Development Project (DFS 2.0) and the Sandstone Project through to Financial Investment Decision.
On 10 February 2026, the Company issued Tranche 1 shares of 105.6 million at $0.50 per share and received
proceeds of $52.8 million (before costs). The second tranche (244.4 million shares at $0.50 per share for gross
proceeds of $122.2 million) is subject to shareholder approval scheduled to take place at a General Meeting of
Shareholders on 10 March 2026.
• On 10 February 2026, the Company launched a Share Purchase Plan (SPP) at $0.50 per share to eligible
shareholders to raise proceeds of $5 million (before costs). The SPP closed on 27 February 2026, the
announcement of results and issue of new shares is expected to take place on 6 March 2026.
The financial report does not include adjustments relating to the recoverability and classification of recorded asset amounts nor to the amounts and classification of liabilities that might be necessary should the Group not continue as a going concern.
New and revised accounting standards effective for the current reporting period The Group has adopted all of the new and amended Standards and Interpretations issued by the Australian Accounting Standards Board (AASB) that are relevant to the Group and effective for the current reporting period. The Group has considered the implications of new and amended Accounting Standards and has determined that their application to the financial statements is either not relevant or not material.
Accounting standards issued but not yet effective The Group has considered all Standards and Interpretations issued but not yet effective for the current reporting period and has determined that their implication to the financial statements is either not relevant or not material. NOTE 2: SEGMENT REPORTING
Segment Reporting
The Group’s operating segment has been determined with reference to the information and reports the chief operating
decision makers use to make strategic decisions regarding Company resources.
The chief operating decision makers include the Managing Director, Executive Director – Operations and the Board of Directors. Financial information is reported to the chief operating decision makers as a single segment and all significant operating decisions are based upon analysis of the Group as one segment. The financial results of this segment are equivalent to the financial statements of the Group as a whole. The Group has one reportable segment which is exploration, development and mining of minerals in Australia.
21
NOTES TO THE FINANCIAL STATEMENTS FOR THE PERIOD ENDED 31 December 2025
NOTE 3: REVENUE FROM CONTINUING OPERATIONS
December 2025 $’000 December 2024 $’000 Gold revenue 38,729 2,165 38,729 2,165
a) Accounting policy Material accounting policy Sale of gold
Revenue from the sale of gold is recognised when control of the gold has transferred to the customer, which generally occurs upon delivery to the processor in accordance with contractual terms. Gold sales are subject to provisional pricing arrangements whereby: • The Company issues a provisional invoice based on the average price for the month of delivery; and • The final sales price is determined by reference to the quoted average market price in the month of the processing of the parcel.
Accordingly, the final consideration receivable may vary due to the movements in the gold price during the provisional pricing period
In accordance with AASB 9 Financial Instruments, provisional pricing features are treated as embedded derivatives. Accordingly, receivables subject to provisional pricing are classified as financial assets at fair value through profit or loss (FVTPL). Movements in fair value arising from provisional pricing are recognised separately in revenue.
b) Revenue composition
December 2025 $’000 December 2024 $’000 Gold sales revenue 36,188 2,165 Adjustment arising from provisional pricing 2,541 - Total revenue 38,729 2,165
Provisional pricing adjustments reflect movements in gold prices between the date of delivery and the reporting date or final settlement date.
c) Provisionally priced sales outstanding
At 31 December 2025, the Company had provisionally priced sales outstanding as follows:
December 2025 December 2024
Gold ounces subject to provisional pricing (ounces) 2,147 - Trade receivables subject to price remeasurement ($’000) 9,043 -
22
NOTES TO THE FINANCIAL STATEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 4: COST OF SALES
December 2025 $’000 December 2024 $’000 Costs of production 27,302 2,427 Depreciation 14,988 1,333 Royalties 1,355 36 43,645 3,796 NOTE 5: EXPENSE ITEMS
a) Administration and other expenses
December 2025 $’000 December 2024 $’000 Employee benefits expense 2,760 1,448 Legal and compliance 389 416 Other expenses 1,709 1,308 4,858 3,172
b) Finance income and cost
Finance Income
December 2025
$’000
December 2024
$’000
Interest Income 334 145
Finance costs
Interest on borrowings (1,090) (345)
Foreign exchange loss (133) -
Interest expense on lease liabilities (665) (77)
Provisions: unwinding discount (184) (347)
Costs relating to borrowings (728) (31)
(2,800) (800)
23
NOTES TO THE FINANCIAL STATEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 6: LOSS PER SHARE
December 2025 December 2024
Net loss for period ($’000) 36,675 20,920 Weighted average number of shares (‘000) 587,286 279,667 Adjusted weighted average number of ordinary shares for the purposes of diluted loss per share n/a n/a Total basic/diluted loss per share ($) 0.06 0.07 On 17 April 2025, the Company completed a 1-for-25 consolidation of its ordinary shares. The consolidation reduced the number of issued shares on issue without any change to total contributed equity. In accordance with AASB 133 Earnings per Share, the weighted average number of shares used in calculating basic and diluted earnings per share for the prior corresponding period has been retrospectively adjusted as if the consolidation had occurred at the beginning of that period. Accordingly, earnings per share for the half-year ended 31 December 2024 have been restated. There is no impact on reported loss for the prior period. NOTE 7: TRADE RECEIVABLES December 2025 June 2025
$’000 $’000 Trade receivables 9,869 7,050 ATO receivables 2,916 931 Prepayments 1,780 610 Bank guarantees and deposits 102 75 Other financial assets 3,754 3,641 Deferred borrowing costs 420 - 18,841 12,307
NOTE 8: INVENTORIES December 2025 June 2025
$’000 $’000 Ore stockpiles 8,936 963 Consumable supplies 470 223 9,406 1,186
24
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 9: PROPERTY, PLANT AND EQUIPMENT
Office furniture and
equipment
Plant and
equipment
Motor vehicles
Mine
properties
Land and
building
Asset under
construction
Right-of-
use asset
Total
$’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000 At 30 June 2025, net of accumulated depreciation and impairment 68 6,575 249 44,501 369 - 14,063 65,825 Cost 213 10,689 544 93,053 385 - 16,654 121,538 Accumulated depreciation (145) (4,114) (295) (48,552) (16) - (2,591) (55,713) At 1 July 2025, net of accumulated depreciation and impairment 68 6,575 249 44,501 369 - 14,063 65,825 Additions 129 4,188 403 10,783 - 819 1,685 18,007 Depreciation charge for the period (33) (808) (45) (10,978) (8) - (3,277) (15,149) Balance at 31 December 2025, net of accumulated depreciation and impairment 164 9,955 607 44,306 361 819 12,471 68,683 Cost 342 14,877 947 103,836 385 819 18,339 139,545 Accumulated depreciation (178) (4,922) (340) (59,530) (24) - (5,868) (70,862)
Brightstar Resources Limited
25
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 10: DEFERRED EXPLORATION AND EVALUATION EXPENDITURE
Costs carried forward in respect of Exploration and Evaluation expenditure:
$’000 Balance at 1 July 2025 129,238 Acquisition of subsidiary (refer to note 11) 76,804 Balance at 31 December 2025 206,042
NOTE 11: ACQUISITION OF SUBSIDIARY
On 21 July 2025 the Company announced it had entered a Scheme Implementation Deed to acquire 100% of the shares in Aurumin Limited (Aurumin) via a Share and Option Scheme of Arrangement (together the Schemes). The acquisition completed on 2 December 2025, the Company issued 128,002,115 fully paid ordinary shares to Aurumin shareholders and 28,094,929 options to Aurumin optionholders.
The fair value of shares issued was based upon the Company’s closing share price on 30 November 2025 of $0.485. The fair value of the options was determined using Hoadley’s stock option model. Key valuation inputs are as follows:
Item/ASX code O22 O23 O24 O25 O26 Total Valuation date 30 Nov 2025 30 Nov 2025 30 Nov 2025 30 Nov 2025 30 Nov 2025 - Spot price ($) 0.485 0.485 0.485 0.485 0.485 - Exercise price ($) 0.240 0.240 0.240 1.0 0.24 - Vesting date n/a n/a n/a n/a n/a - Expiry date 31 Aug 2026 31 Jul 2028 22 Dec 2026 31 Jul 2026 31 Jul 2027 - Volatility 80% 80% 80% 80% 80% - Risk-free rate 3.81% 3.87% 3.81% 3.81% 3.81% - Dividend yield Nil Nil Nil Nil Nil - Number of options 5,000,000 2,679,852 12,500,000 1,656,250 6,258,827 28,094,929 Value ($) 0.265 0.283 0.270 0.062 0.276 - Total value ($’000) 1,325 758 3,375 103 1,727 7,288
26
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 11: ACQUISITION OF SUBSIDIARY (CONTINUED)
The fair value of the identifiable assets and liabilities of Aurumin at the date of acquisition have been determined as follows ($’000) Cash and cash equivalents 960 Trade receivables and other financial assets 415 Exploration, evaluation and development expenditure 76,804 Trade and other payables (653) Provisions (3,643) Acquisition date fair value of the total consideration transferred 73,883
Representing:
Shares issued to vendor (note 16) 62,081
Options issued to vendor (note 18) 7,288
Transaction costs
4,514
73,883
The transaction is accounted for as an asset acquisition as management has assessed it does not meet the definition of a business pursuant to AASB 3 Business Combinations. Aurumin is an entity which holds exploration licences within the Sandstone region.
27
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2024 NOTE 12: TRADE AND OTHER PAYABLES December 2025 June 2025
$’000 $’000 Trade payables 13,710 10,210 Other payables and accruals 24,994 21,076 38,704 31,286
NOTE 13: LEASE LIABILITIES
December 2025 June 2025
$’000 $’000 Current lease liabilities 4,925 5,336 Non-Current lease liabilities 7,367 8,132 12,292 13,468
$’000 Balance at 1 July 2025 13,468 Lease additions 1,185 Lease modifications 500 Lease principal repayments (2,861) Balance at 31 December 2025 12,292
28
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 14: BORROWINGS December 2025 June 2025
$’000 $’000
Current
Ocean Partners’ loan 17,182 14,216
Camp Financing Arrangement 2,182 2,182
Other loans 2,141 482
21,505 16,880
Non-current borrowings
Other loans 850 625
850 625
Financing Arrangements:
Ocean Partners’ Loan
During FY25, the Group executed a US$11.5 million revolving debt facility (Loan Facility) with Ocean Partners Australia Pty Ltd (Ocean Partners).
Facility Overview: The Loan Facility, structured as an advance payment agreement, allows the Group to draw down up to US$11.5 million to fund production expansion and general working capital requirements. Key terms include:
- Advance Payment Limit: US$11.5 million, drawable in one or multiple tranches;
- Repayment Term: Each drawdown to be repaid within 6 months via deductions from provisional payments under the Ore Purchase Agreement (OPA);
- Interest Rate: 3-month CME Term SOFR +11%, p.a. accruing monthly; and
- Security: Ocean Partners holds security over Brightstar’s ore stockpiles until sold to Genesis under the OPA.
Changes in liabilities arising from financing activities:
$’000 Opening balance at 1 July 2025 17,505 Loans drawn 36,756 Principal repayments (32,026) Loan written off (24) Effect of exchange rate movement on loan balance 144 Closing balance at 31 December 2025 22,355
29
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 15: PROVISIONS December 2025 June 2025
$’000 $’000
Current
Employee benefits 1,238 899
1,238 899
Non-Current
Rehabilitation provision 23,967 10,890
23,967 10,890
Reconciliation of movement in provision for rehabilitation $’000 Opening balance at 1 July 2025 10,890 Additions recognised through asset acquisition 3,643 Reassessment of provision 1 9,250 Unwinding of discount 184 Closing balance at 31 December 2025 23,967
1 During the half-year, the Group undertook a comprehensive review of its rehabilitation and closure obligations at the Menzies Project (following approval of the Mine Closure Plan). This review incorporated updated cost estimates, revised closure methodologies, and current assumptions regarding post-closure monitoring and management requirements.
The revised provision represents management’s best estimate of the present value of expenditure expected to be required to settle the obligation, based on current legal and constructive requirements and the Group’s environmental management commitments. The corresponding adjustment has been expensed as exploration expenditure.
The Group continues to review its rehabilitation estimates annually, or more frequently if changes in operations, regulations or cost assumptions warrant revision.
30 NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 16: ISSUED CAPITAL December 2025 December 2025 June 2025 June 2025 No. ‘000 $’000 No.’000 $’000 Fully paid ordinary shares 707,311 364,411 472,577 255,011 Date Number ‘000 $’000 Movement in ordinary share capital At 30 June 2025 472,577 255,011 Placement 23 July 2025 104,167 50,000 Exercise of performance rights 28 July 2025 1,576 - ESIP bonus – issue of shares (i) 31 July 2025 931 446 ESIP bonus – issue of shares (i) 23 September 2025 58 23 Acquisition of Aurumin Ltd (Note 11) 2 December 2025 128,002 62,081 Less capital raising costs (3,150) At 31 December 2025 707,311 364,411 (i)As part of the Employee Shares Incentive Plan, the Company issued 989,022 shares during the period to employees, relating to bonuses for FY25. NOTE 17: RESERVES December 2025 June 2025 $’000 $’000 Share-based payment reserve 7,053 5,778 Equity reserve 4,911 4,911 Acquisition reserve (note 11) 7,288 Total Reserves 19,252 10,689 NOTE 18: SHARE-BASED PAYMENTS December 2025 December 2024 $’000 $’000 Share option expense - 819 Performance rights expense 1,275 302 Total movement in reserves 1,275 1,121 Represented by Share-based payment expense 1,275 1,121
31
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 18: SHARE-BASED PAYMENTS (CONTINUED)
(ii) Details of new issues during the period:
Under the Company’s Incentive Award plan, the Company issued the following incentives to Executive Directors, Executives and Management during the period: • a short-term incentive (STI), designed to reward creation of exceptional short-term shareholder value as evidenced by the performance hurdles, issued in seven tranches of Performance Rights (Rights) for Executive Directors as (Class STIP PR DIR) and seven tranches of Performance rights for Executives and Management (as Class STIP PR) and; • a long-term incentive (LTI), designed to reward creation of exceptional long-term shareholder value as evidenced by performance hurdles, issued in six tranches of Rights for Directors and Executives and four tranches for Management as (Class LTIP)
Details of Executive Directors’ STIs are as follows (Class PR DIR): Item Tranche 1 Tranche 2 Tranche 3 Tranche 4 Tranche 5 Tranche 6 Tranche 7 Grant date 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 Fair value of each Right ($) 0.44 0.44 0.44 0.44 0.44 0.16 0.44 Commenceme nt of performance period 1 Jul 2025 1 Jul 2025 1 July2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 July 2025 Vesting date 30 Jun 2026 30 Jun 2026 30 Jun 2026 30 Jun 2026 30 Jun 2026 30 Jun 2026 30 Jun 2026 Expiry date 31 Dec 2027 31 Dec 2027 31 Dec 2027 31 Dec 2027 31 Dec 2027 31 Dec 2027 31 Dec 2027 Volatility n/a n/a n/a n/a n/a 80% n/a Risk-free rate n/a n/a n/a n/a n/a 3.67% n/a Dividend yield Nil Nil Nil Nil Nil Nil nil Number of Rights 36,161 12,054 48,214 48,214 48,214 48,214 80,357 Price at grant ($) 0.44 0.44 0.44 0.44 0.44 0.44 0.44 Valuation per Tranche ($’000) 31 10 42 42 42 15 70 Share based payment expense ($’000) 15 5 10 - 20 4 25
32
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 18: SHARE-BASED PAYMENTS (CONTINUED)
Details of STIs for Executives and Management
Item Tranche 1 Tranche 2 Tranche 3 Tranche 4 Tranche 5 Tranche 6 Tranche 7
Grant date 8 Oct 2025 8 Oct 2025 8 Oct 2025 8 Oct 2025 8 Oct 2025 8 Oct 2025 8 Oct 2025
Fair value of
each Right ($)
0.57 0.57 0.57 0.57 0.57 0.32 0.57
Commencement
of performance
period
1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025
Vesting date
30 Jun
2026
30 Jun
2026
30 Jun
2026
30 Jun
2026
30 Jun
2026
30 Jun
2026
30 Jun
2026
Expiry date
31 Dec
2027
31 Dec
2027
31 Dec
2027
31 Dec
2027
31 Dec
2027
31 Dec
2027
31 Dec
2027
Volatility n/a n/a n/a n/a n/a 80% n/a
Risk-free rate n/a n/a n/a n/a n/a 4.33% n/a
Dividend yield Nil Nil Nil Nil Nil Nil Nil
Number of Rights 92,843 30,948 123,790 123,790 123,790 123,790 677,197
Price at grant ($) 0.57 0.57 0.57 0.57 0.57 0.57 0.57
Valuation per
Tranche ($’000)
104 35 140 140 140 140 430
Share based
payment
expense ($’000)
42 14 30 - 56 33 211
In addition to remaining an employee on 30 June 2026, STI performance rights were issued with the following vesting
conditions:
Tranche 1:
- Safety – Lost time injury frequency rate less than 1.5 for FY2026. Tranche 2
- Environment – No major environmental or regulatory non-compliance issue.
Tranche 3 - Gold Production – Achieving at least 110% of Board approved Group budgeted gold production. Tranche 4
- Cost – Achieving operating costs of less than $A3,800/oz Tranche 5
- In respect of the Company’s Laverton Hub, the Company announcing at least a 20% increase in total Group
Reserves as compared to total Group Reserves as at 1 July 2025.
Tranche 6 - The number of Absolute total shareholder return (ATSR) Rights that vest is based on the total shareholder return (TSR) of Brightstar over the performance period. The ATSR is measured by comparing the Company’s 20 trading day volume weighted average share price (VWAP) up to and including 30 June 2025 to the 20 trading day VWAP up to and including 30 June 2026. The ATSR Rights will vest according to the following schedule:
33
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 18: SHARE-BASED PAYMENTS (CONTINUED)
Company’s TSR performance
Percentage of ATSR Rights
eligible to vest
<25% Nil
>25% 100%
Tranche 7
- Various personal objectives.
Details of Executive Directors LTIs are as follows:
Item ATSR Rights RTSR Rights Tranche 1 Tranche 2 Tranche 3 Tranche 4 Grant date 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 24 Nov 2025 Fair value of each Right ($) 0.22 0.33 0.44 0.44 0.44 0.44 Commencement of performance period 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 Vesting date 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 Expiry date 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 Volatility 80% 80% n/a n/a n/a n/a Risk-free rate 3.93% 3.93% n/a n/a n/a n/a Dividend yield Nil Nil Nil Nil Nil Nil Number of Rights 900,000 900,000 900,000 450,000 900,000 450,000 Price at grant ($) 0.44 0.44 0.44 0.44 0.44 0.44 Valuation per Tranche ($’000) 202 298 392 196 392 196 Share based payment expense ($’000) 34 50 62 26 46 21
34 NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 18: SHARE-BASED PAYMENTS (CONTINUED) Details of LTIs for Executive Employees Item ATSR Rights RTSR Rights Tranche 1 Tranche 2 Tranche 3 Tranche 4 Grant date 22 Dec 2025 22 Dec 2025 22 Dec 2025 22 Dec 2025 22 Dec 2025 22 Dec 2025 Fair value of each Right ($) 0.32 0.40 0.55 0.55 0.55 0.55 Commencement of performance period 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 Vesting date 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 Expiry date 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 Volatility 80% 80% n/a n/a n/a n/a Risk-free rate 4.33% 4.33% n/a n/a n/a n/a Dividend yield Nil Nil Nil Nil Nil Nil Number of Rights 385,000 385,000 385,000 192,500 385,000 192,500 Price at grant ($) 0.55 0.55 0.55 0.55 0.55 0.55 Valuation per Tranche ($’000) 123 154 212 106 212 106 Share based payment expense ($’000) 21 26 34 14 25 12 In addition to remaining an employee on 30 June 2028. LTI performance rights were issued with the following vesting conditions: Market Based Measurements •ATSR Rights -The number of ATSR Rights that vest is based on the TSR of Brightstar over the performance period. The ATSR Rights will vest according to the following schedule: Company’s TSR performance Percentage of ATSR Rights eligible to vest <100% Nil >100%100% •RTSR Rights -The number of RTSR Rights that vest is based on the TSR of Brightstar over the performance period, relative to the returns of the Peer Group. The TSR is measured by comparing the relevant entity’s 20 day trading VWAP up to and including 30 June 2025 to the 20 trading day VWAP up to and including 30 June 2028 (with dividends reinvested). The RTSR Rights will vest according to the following schedule.
35 NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 18: SHARE-BASED PAYMENTS (CONTINUED) Company’s TSR performance relative to the Peer Group Percentage of RTSR Rights eligible to vest Less than 50 th percentile Nil 50 th percentile 50% Between 50 th percentile and 75 th percentile 51%-99% Pro-rata Greater than 75 th percentile 100% Business Milestones Tranche 1 Ore Reserve – public announcement to the ASX of 1,000,000oz of gold Ore Reserve (as defined in the JORC Code) declared across the Company’s projects. Tranche 2 Health, Safety and Environment Measure – No serious injuries or death, no major environmental incident or breach Tranche 3 In respect of the Company’s Laverton Hub, announcement to the ASX of the commencement of commercial production processed through a Company-owned and operated processing plant. Tranche 4 In respect of the Company’s Sandstone Hub, announcement to the ASX of a positive final investment decision and commencement of construction of a second Company-owned processing plant, following completion of feasibility studies, all requisite permitting/approvals and funding. Details of LTI for Management Item Tranche 1 Tranche 2 Tranche 3 Tranche 4 Grant date 22 Dec 2025 22 Dec 2025 22 Dec 2025 22 Dec 2025 Fair value of each Right ($) 0.55 0.55 0.55 0.55 Commencement of performance period 1 Jul 2025 1 Jul 2025 1 Jul 2025 1 Jul 2025 Vesting date 30 Jun 2028 30 Jun 2028 30 Jun 2028 30 Jun 2028 Expiry date 31 Dec 2029 31 Dec 2029 31 Dec 2029 31 Dec 2029 Volatility n/a n/a n/a n/a Risk-free rate n/a n/a n/a n/a Dividend yield Nil Nil Nil Nil Number of Rights 2,056,250 2,056,250 2,056,250 2,056,250 Price at grant ($) 0.55 0.55 0.55 0.55 Valuation per Tranche ($’000) 1,131 1,131 1,131 1,131 Share based payment expense ($’000) 157 132 116 108
36
NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 18: SHARE-BASED PAYMENTS (CONTINUED)
In addition to remaining an employee on 30 June 2028. LTI performance rights for the Management were issued with the following vesting conditions: Business Milestones Tranche 1 Ore Reserve – public announcement to the ASX of 1,000,000oz of gold Ore Reserve (as defined in the JORC Code) declared across the Company’s projects. Tranche 2 Health, Safety and Environment Measure – No serious injuries or death, no major environmental incident or breach Tranche 3 In respect of the Company’s Laverton Hub, announcement to the ASX of the commencement of commercial production processed through a Company-owned and operated processing plant. Tranche 4 In respect of the Company’s Sandstone Hub, announcement to the ASX of a positive final investment decision and commencement of construction of a second Company-owned processing plant, following completion of feasibility studies, all requisite permitting/approvals and funding.
Brightstar Resources Limited 37 NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 18: SHARE-BASED PAYMENTS (CONTINUED) Set out below is a summary of options movement during the period Code Grant date Expiry date Exercise price ($) Balance at 1 July 2025 Granted during the period Exercised during the period Lapsed/forfeited during the period Balance at 31 Dec 2025 Exercisable at 31 Dec 2025 7OP 26-May-2316-Jan-260.58 131,579 - - - 131,579 131,579 8OP 26-May-2316-Jan-260.95 157,895 - - - 157,895 157,895 O10 4-Sep-234-Aug-250.50 1,600,000 - - (1,600,000) - - O11 4-Sep-237-Jul-260.50 600,000 - - - 600,000 600,000 O12 4-Sep-237-Jul-260.75 600,000 - - - 600,000 600,000 O14 31-May-2430-Jun-26 - 552,000 - - - 552,000 552,000 O15 31-May-2430-Jun-260.58 168,878 - - - 168,878 168,878 O16 22-May-2419-Jul-270.75 1,000,000 - - - 1,000,000 1,000,000 O17 22-May-2419-Jul-281.00 1,000,000 - - - 1,000,000 1,000,000 O18 5-Jul-247-Jul-260.63 600,000 - - - 600,000 600,000 O19 5-Jul-247-Jul-260.88 600,000 - - - 600,000 600,000 O20 17-Jul-241-Jul-270.63 800,000 - - - 800,000 800,000 O21 17-Jul-241-Jul-280.88 800,000 - - - 800,000 800,000 O22 30-Nov-2531-Aug-260.24 -
5,000,000- - 5,000,000 5,000,000 O23 30-Nov-2531-Aug-280.24 - 2,679,852- - 2,679,852 2,679,852 O24 30-Nov-2522-Dec-260.24 - 12,500,000- - 12,500,000 12,500,000 O25 30-Nov-2531-Jul-261.00 - 1,656,250- - 1,656,250 1,656,250 O26 30-Nov-2531-Jun-270.24 - 6,258,827- - 6,258,827 6,258,827 Total 8,610,352 28,094,929 -(1,600,000)35,105,281 35,105,281
38 NOTES TO THE FINANCIAL STATEMEMENTS FOR THE PERIOD ENDED 31 December 2025 NOTE 18: SHARE-BASED PAYMENTS (CONTINUED) Set out below is a summary of performance rights movement during the period Code Grant date Expiry date Balance at 1 July 2025 Granted during the period Exercised during the period Lapsed during the period Balance at 31 Dec 2025 Exercisable at 31 Dec 2025 PR 1 29-Mar-2331-Mar-26 800,000 - (800,000)- - - PR 3 29-Mar-2331-Mar-26 800,000 - - - 800,000 - PR 4 29-Mar-2331-Mar-26 400,000 - - - 400,000 - PR A 31-May-243-Jun-29 776,250 - - - 776,250 - PR B 31-May-243-Jun-29 776,250 - - - 776,250 - PR C 31-May-243-Jun-29776,250 - (776,250) - - - PR D 31-May-243-Jun-29776,250 - - - 776,250 - LTIP PR 24-Nov-25; 22-Dec- 25 ; 22 31-Dec-29- 14,650,000 - - 14,650,000 - STIP PR DIR 24-Nov-2531-Dec-26- 321,428 - - 321,428 - STIP PR 8-Oct-2531-Dec-26- 1,296,149 - - 1,296,149 - Total 5,105,000 16,267,577 (1,576,250) -19,796,327-
Brightstar Resources Limited
39
NOTES TO THE FINANCIAL STATEMEMENTS
FOR THE PERIOD ENDED 31 December 2025
NOTE 19: FAIR VALUE MEASUREMENTS
Fair value hierarchy
This section explains the judgements and estimates made in determining the fair values of the financial instruments that
are recognised and measured at fair value in the financial statements. To provide an indication about the reliability of the
inputs used in determining fair value, the Group has classified its financial instruments into the three levels prescribed
under the accounting standards. An explanation of each level follows underneath the table.
December
2025 ($’000)
June 2025
($’000)
Significant inputs
Financial assets
Level 2 - Trade and other receivables
(Option premium)
4 -
Observable forward commodity prices,
observable volatility curves, discount rates
derived from market yield curves
Level 3 - Trade and other receivables
(Deferred consideration)
3,750 3,641
Probability weighted payment scenarios,
discount rate reflecting counterparty
Level 3 – Trade and other receivables
(Provisionally priced)
9,043 -
Forward commodity prices at reporting date
There were no transfers between levels for recurring fair value measurements during the year. The Group’s policy is to
recognise transfers into and out of fair value hierarchy levels as at the end of the reporting period.
Level 1: The fair value of financial instruments traded in active markets (such as publicly traded derivatives and equity
securities) is based on quoted market prices at the end of the reporting period.
Level 2: The fair value of financial instruments that are not traded in an active market (e.g. over-the counter derivatives) is
determined using valuation techniques that maximise the use of observable market data and rely as little as possible on
entity-specific estimates. If all significant inputs required to fair value an instrument are observable, the instrument is
included in level 2.
Level 3: If one or more of the significant inputs is not based on observable market data, the instrument is included in level
3. This is the case for unlisted equity securities and for instruments where ESG risk gives rise to a significant unobservable
adjustment.
Valuation techniques used to determine fair values
Specific valuation techniques used to value financial instruments include:
•discounted cash flow projections based on reliable estimates of future cash flows
•Fair value is estimated using observable forward prices for gold and discounted to present value using market
interest rates.
Fair value measurements using significant unobservable inputs
Option Premium
Level 2
Receivable
Level 3
Total
$’000 $’000 $’000
Opening balance 1 July 2025
455
3,641
4,096
(Losses)/Gains recognised in Net loss on revaluation of financial
instruments at fair value through profit and loss
(451)109(342)
Provisionally priced receivables -- 9,458 9,458
Closing balance 31 December 2025
4
13,208
13,212
40
NOTES TO THE FINANCIAL STATEMENTS
FOR THE PERIOD ENDED 31 December 2025
NOTE 20: COMMITMENTS AND CONTINGENCIES
Exploration commitments
The Group has an expenditure commitment of $5,061,640 for the 2025-2026 ($3,184,620 for the 2024-2025 year) period
to sustain current tenements under lease from the Department of Mines, Industry Regulation and Safety (DMIRS). The
expenditure commitment includes annual tenement rentals of $937,125 (2024-2025: $809,339).
Capital expenditure commitments
The Directors are not aware of any other commitments from the Group’s operations as at 31 December 2025.
Contingencies
As part of the Company’s acquisition of Linden, Brightstar assumed contingent liabilities payable to the vendors of Lord
Byron Mining Pty Ltd (LBM) which become payable upon certain milestones being met (LBM Deferred Consideration).
In accordance with the LBM Share Sale and Subscription (SSSA) Variation Agreement, Brightstar granted the LBM sellers
(in their respective proportions) the rights to deferred shares in consideration for the forfeiture of their respective LGA
performance rights (LBM Deferred Consideration Shares). The deferred shares comprise of three tranches with each
tranche valued at $5 million.
The issues of the LBM Deferred Consideration Shares are subject to shareholder approval and if such approval is not
obtained, the LBM Sellers may elect to receive a cash payment in lieu of the issue of the LBM Deferred Consideration
Shares in respect of that tranche or defer the issue of the LBM Deferred Consideration Shares.
The relevant milestones of each tranche of the LBM Deferred Consideration are set out below:
(i)Tranche A: A JORC 2012-compliant Mineral Resource Estimate for the Jasper Hills Project exceeding a total of
400,000oz gold at a grade of no less than 1.4g/t gold, utilising a cut-off grade of 0.5g/t gold.
(ii)Tranche B: An Ore Reserve Estimate for the Jasper Hills Project exceeding a total of 120,000oz gold at a grade
of no less than 1.4g/t gold, utilising a cut-off grade of 0.5g/t gold as determined with the then JORC 2012-compliant
Mineral Resource Estimate.
(iii)Tranche C: The first commercial production derived from the Jasper Hills Project.
As part of management's purchase price allocation analysis pursuant to AASB 3 Business Combinations, Brightstar
determined the present value of Tranche C to be $0.4 million and nil value attributable to Tranches A and B.
During FY2025, the Company settled Tranche C through the issue of shares to the sellers. As at 31 December 2025, nil
value is attributed to Tranches A and B (30 June 2025: Nil).
On 2 October 2024, the Company completed the acquisition of Montague East Gold Project (MEGP) from Gateway Mining
Limited. As part of the acquisition of the MEGP, the following contingent consideration was agreed between the parties:
-$2 million payable in Brightstar shares (subject to Brightstar’s shareholder approval and payable in cash if
shareholder approval is not received), upon commencement of commercial mining operations in respect of the
gold mineral rights, or the delineation of a JORC Mineral Resource on the tenements exceeding 1.0 Moz.
As part of the MEGP acquisition, the Company has assumed the following royalty obligations:
-In the event Element 25 Limited relinquish their 20% interest in the tenement E57/1060, a 1.7% royalty payable
to Element 25 Limited in relation to production from tenement E57/1060 (inclusive of a 0.7% gross revenue royalty
and a 1% net smelter royalty) on production up to 100,000 ounces of gold or 25,000 tonnes of copper. In the
event that the Company elects to continue to contribute to the Joint Venture in accordance with the Joint Venture
Agreement, a 0.7% gross revenue royalty on up to 100,000 ounces of gold or 25,000 tonnes of copper. As at 31
December 2025, Element 25 Limited had not made any election in relation to its 20% remnant interest nor is there
any material expenditure planned for tenement E57/1060 in the short-term; and
-1% gross revenue royalty payable to Mining Equities Pty Ltd relating to the minerals produced on tenements
E53/2098 and E53/2093.
41
NOTES TO THE FINANCIAL STATEMENTS
FOR THE PERIOD ENDED 31 December 2025
NOTE 20: COMMITMENTS AND CONTINGENCIES (CONTINUED)
On 9 December 2024 the Company completed the acquisition of Alto Metals Limited via a Scheme of Arrangement. The
Company assumed a 2% gross revenue royalty payable to Mr Stone and Mr Legendre in equal proportion relating to
production from the tenements E57/1029, E57/1030, E57/1031, E57/1033, E57/1044, P57/1377, P57/1378 and any other
tenement applied for or granted in renewal, substitution, variation or extension (in whole or in part) of those tenements.
Additional historical royalties may also exist over certain tenements of the Company. Whether the obligations to pay those
royalties remains is to be determined.
Additional historical royalties may also exist over certain tenements of the Company. Whether the obligations to pay those
royalties remains is to be determined.
There were no other contingencies as at 31 December 2025 other than already disclosed.
NOTE 21: INTEREST IN SUBSIDIARIES
The following companies were incorporated or acquired since 30 June 2025:
Entity
Country of
incorporation
Primary
activity
Date of Acquisition Shares (%)
Aurumin Limited Australia Exploration
activities
30 November 2025 100%
Aurumin Gidgee Pty Ltd Australia Exploration
activities
30 November 2025 100%
Sandstone Operations Pty Ltd Australia Exploration
activities
30 November 2025 100%
Sandstone Iron Exploration Pty
Ltd
Australia Exploration
activities
30 November 2025 100%
Aurumin Australia Pty Ltd Australia Exploration
activities
30 November 2025 100%
Aurumin Sandstone Pty Ltd Australia Exploration
activities
30 November 2025 100%
Kurnod Pty Ltd Australia Exploration
activities
30 November 2025 100%
42
NOTES TO THE FINANCIAL STATEMENTS
FOR THE
PERIOD ENDED 31 December 2025
NOTE 22: RELATED PARTY DISCLOSURE
Transactions with related parties
Purchases from and sales to related parties are made on terms equivalent to those that prevail in arm’s length transactions.
During the interim period, Blue Cap Mining Pty Ltd (BCM), an entity controlled by Mr Ashley Fraser (non-executive director),
BCM provided services to Brightstar including earthworks, mobile equipment hire, personnel, production, drilling and
haulage. Expenses incurred by the Company and payable to BCM at the end of the period totalled $334,000 and $1.9
million, respectively for the period ending 31 December 2025 (31 December 2024: $1.3 million and $271,000). These
rates were entered into on an arm’s length basis and tested in the market as fair and reasonable rates.
During the period, a loan of $24,000, previously advanced to the Company was forgiven by Blue Capital Equities Pty
Ltd (BCE), an entity controlled by Mr
Ashley Fraser (non-executive director). As at 31 December 2025, there was no
outstanding loan balance owed to BCE (31 December 2024: $24,000).
Other than as outlined above, the Group did not enter into any further related party transactions with the Director, key
management personnel or their related entities.
NOTE 23: EVENTS AFTER THE BALANCE DATE
On 29 January 2026, the Company announced the completion and release of an updated Definitive Feasibility Study
(DFS 2.0) in respect of the Goldfields Gold Project. DFS 2.0 captures enlarged Mineral Resources and a transition
from the previous Menzies toll milling strategy to a consolidated Laverton processing strategy enabling an improved
production profile, mine life and economics while removing third party processing risk. The undiscounted pre-tax free
cash flow of DFS 2.0 is $1.0 billion, NPV
8
of $606 million and IRR of 74% at an assumed Base Case of A$6,000/oz.
On 2 February 2026, the Company announced a capital raising with binding commitments of $175 million (before costs)
via a two-tranche placement (350 million shares at $0.50 per share). On 10 February 2026, the Company issued
Tranche 1 shares of 105.6 million at $0.50 per share and received proceeds of $52.8 million (before costs). The second
tranche (244.4 million shares at $0.50 per share for gross proceeds of $122.2 million) is subject to shareholder approval
scheduled to take place at a General Meeting of Shareholders on 10 March 2026.
43 DIRECTORS’ DECLARATION In the opinion of the directors of Brightstar Resources Limited (the ‘Company’): •the attached financial statements and notes comply with the Corporations Act 2001, Australian Accounting Standard AASB 134 ‘Interim Financial Reporting’, the Corporations Regulations 2001 and other mandatory professional reporting requirements; •the attached financial statements and notes give a true and fair view of the consolidated entity's financial position as at 31 December 2025 and of its performance for the half-year ended on that date; and •there are reasonable grounds to believe that the company will be able to pay its debts as and when they become due and payable. This declaration is signed in accordance with a resolution of the Board of Directors pursuant to S.303 (5)(a) of the Corporations Act 2001. Richard Crookes Chairman Dated this 27th day of February, 2026
KPMG, an Australian partnership and a member firm of the KPMG global organisation of independent member firms affiliated with KPMG International Limited, a private English company limited by guarantee. All rights reserved. The KPMG name and logo are trademarks used under license by the independent member firms of the KPMG global organisation. Liability limited by a scheme approved under Professional Standards Legislation. Independent Auditor’s Review Report To the shareholders
of Brightstar Resources Limited Conclusion
We have reviewed the accompanying Interim
Financial Report of Brightstar Resources
Limited.
Based on our review, which is not an audit,
we have not become aware of any matter
that makes us believe that the Interim
Financial Report of Brightstar Resources
Limited does not comply with the
Corporations Act 2001, including:
•
giving a true and fair view of the Group’s
financial position as at 31 December 2025
and of its performance for the half-year
ended on that date; and
•
complying with Australian Accounting
Standard AASB 134 Interim Financial
Reporting and the Corporations
Regulations 2001.
The Interim Financial Report comprises the:
•Condensed consolidated statement of financial
position as at 31 December 2025;
•Condensed consolidated statement of profit or
loss and other comprehensive income,
Condensed consolidated statement of changes in
equity a
nd Condensed consolidated statement of
cash flows for the half-year ended on that date;
•Notes 1 to 23 comprising material accounting
policies and other explanatory information; and
•Directors’ Declaration.
The Group
comprises Brightstar Resources Ltd (the
Company) and the entities it controlled at the half
year’s end or from time to time during the half-year.
Basis for Conclusion
We conducted our review in accordance with ASRE 2410 Review of a Financial Report Performed by
the Independent Auditor of the Entity. Our responsibilities are further described in the Auditor’s
Responsibilities for the Review of the Financial Report section of our report.
We are independent of the Group in accordance with the auditor independence requirements of the
Corporations Act 2001 and the ethical requirements of the Accounting Professional and Ethical
Standards Board’s APES 110 Code of Ethics for Professional Accountants (including Independence
Standards) (the Code) that are relevant to our audit of the annual financial report in Australia. We
have also fulfilled our other ethical responsibilities in accordance with the Code.
44
Responsibilities of the Directors for the Interim Financial Report The Directors of the Company are responsible for: •preparing the Interim Financial Report in accordance with the Corporations Act 2001, including giving a true and fair view of the financial position and performance of the Group, and in compliance with Australian Accounting Standards and the Corporations Regulations 2001; and •implementing necessary internal control to enable the preparation of an Interim Financial Report in accordance with the Corporations Act 2001, including giving a true and fair view of the financial position and performance of the Group, and that is free from material misstatement, whether due to fraud or error. Auditor’s Responsibilities for the Review of the Interim Financial Report
Our responsibility is to express a conclusion on the Interim Financial Report based on our review.
ASRE 2410 requires us to conclude whether we have become aware of any matter that makes us
believe that the Interim Financial Report does not comply with the Corporations Act 2001 including
giving a true and fair view of the Group’s financial position as at 31 December 2025 and its
performance for the half-year ended on that date, and complying with Australian Accounting Standard
AASB 134 Interim Financial Reporting and the Corporations Regulations 2001.
A review of an Interim Financial Report consists of making enquiries, primarily of persons responsible
for financial and accounting matters, and applying analytical and other review procedures. A review is
substantially less in scope than an audit conducted in accordance with Australian Auditing Standards
and consequently does not enable us to obtain assurance that we would become aware of all
significant matters that might be identified in an audit. Accordingly, we do not express an audit
opinion.
KPMG Glenn Diedrich
Partner
Perth
27 February 2026
45
1
30 January 2026
DECEMBER 2025 QUARTERLY ACTIVITY REPORT
PROJECT & CORPORATE DEVELOPMENT o Strategic acquisition of Aurumin Limited (ASX: AUN) completed on 2 December 2025 1
concluding Brightstar’s Sandstone consolidation strategy delivering consolidated Mineral
Resources of 2.4Moz @ 1.5g/t Au – of which 1.6Moz occurs in the top 150 metres from surface
▪ Pre-Feasibility work streams (PFS) advancing with major infill programs nearing
completion to underpin a Mineral Resource upgrade in JunQ’CY26
▪ Other PFS works streams advancing including diamond drilling, geotechnical,
metallurgical and mine designs to underpin the PFS due for delivery mid 2026
o Goldfields “DFS 2.0” continued to advance, which was subsequently released after quarter end
2
,
delivering outstanding upgraded economics:
Key Metrics Units A$5,000/oz A$5,500/oz A$6,000/oz A$6,500/oz A$7,000/oz A$7,500/oz
Gold Sales
koz 457
Average LOM Annual Production
koz 75
Discount Rate
% 8
Revenue (net of royalties)
A$M 2,197 2,417 2,637 2,857 3,076 3,296
Peak Funding Requirement
1
A$M 205 196 188 182 178 174 Payback Months 32 23 17 16 14 13 Free Cash Flow (pre-tax) 2
A$M 538 758 977 1,197 1,417 1,637 Pre-Tax NPV 8 (pre-tax) 2
A$M 301 454 606 758 911 1,063 Pre-tax IRR (pre-tax) 2
% 41 58 74 90 106 121 Annual Free Cash Flow (pre-tax) 2
A$M 90 126 163 200 236 273 C1 Operating Cost A$/oz 2,581 2,581 2,581 2,581 2,581 2,581 All-In Sustaining Cost (AISC) A$/oz 2,965 2,981 2,998 3,015 3,032 3,049 NPV 8 / Pre-production Capex Ratio (x) 1.5x 2.3x 3.2x 4.2x 5.1x 6.1x
▪ Brightstar is now focused on Goldfields project execution with a Final Investment Decision (FID) and a full funding solution targeted for completion in MarQ’26 ▪ During the quarter, Brightstar significantly strengthened its operating capabilities, project delivery and leadership skills with the appointment of experienced mining professionals to key roles 3 with the appointments of Daniel Jolley as Project Director, Julie Budrey as Group Health and Safety Manager and Brendan Bow as Environment and Approvals Manager Level 2, 36 Rowland Street Tel: (618) 9277 6008 [email protected] ASX:BTR Subiaco WA 6008 Fax: (618) 9277 6002 brightstarresources.com.au ACN 100 727 491
2 ▪ Brightstar held its Annual General Meeting during the quarter where shareholders voted in favour of all resolutions including the re-elections of Mr Andrew Rich (Executive Director) and Mr Jonathan Downes (Non-Executive Director) 4
▪ Mr Ashley Fraser resigned from the Board to pursue other business interests 5
▪ During the quarter, Brightstar changed auditors with the appointment of KPMG as the Company’s new auditor 6
OPERATIONS
o Group production quarter in December mining 88.3Kt @ 2.76g/t Au for 7,846oz representing
12% quarter-on-quarter production growth from Brightstar’s Laverton underground mining
operations
o Fish mine ramp-up of production in the December quarter, contributing to a record quarterly
production from Fish of 5,078oz, a 42% increase on the previous quarter production
o Safety performance continued to be strong across the Group, with no Lost Time Injuries (LTIs)
extending the Group’s LTI-free record to over 2,099 days.
o Processing campaign through Genesis Minerals’ Laverton Mill processed 82kt @ 2.32g/t Au with
75% recovery for 4,652oz
o Haulage activities continuing with the next processing campaign scheduled for March 2026,
anticipated to be a record processing campaign for Brightstar in terms of both tonnes
processed and gold recovered.
Second Fortune Underground Mine
o Delivered 32kt @ 2.71g/t Au for 2,767oz in the December quarter
o Development of the FTV lode, discovered previously, continued up to 90m of strike on the 995
level. Diamond drilling mobilised to site in December to advance drilling downdip of the FTV
Fish Underground Mine
o Record 57kt @ 2.77g/t Au for 5,078oz produced during the quarter
o Mine development continued to perform well, with 800m of advance completed, ahead of
schedule
o First phase of a two phase underground diamond drilling program completed, targeting Stage 2
mine life extensions and resource definition
3
EXPLORATION ACTIVITIES & MINERAL RESOURCES
o Brightstar announced
7
a Mineral Resource upgrade at its Lady Shenton and Yunndaga
development projects (located within the Goldfields Hub) increasing the Mineral Resource by
22%:
▪ 32% increase in total Mineral Resources at Yunndaga:
New MRE: 206koz @ 2.1g/t Au
Indicated component increased by 187% to 152koz @ 2.2g/t Au
▪ 29% increase in total Mineral Resource at Lady Shenton System
New MRE: 352koz @ 1.4g/t Au
Indicated component increased by 37% to 168koz @ 1.4g/t Au
▪ Upgraded Menzies Mineral Resource has subsequently been fed into the updated
Goldfields DFS 2.0 outcomes and Ore Reserve upgrade
o Drilling continued during the quarter, with programs completed at the Sandstone, Laverton and
Menzies hubs. A total of 104 holes were drilled totalling 17,717m. Excellent results were received
from all deposits with highlights including:
Sandstone Hub
8
o Havilah:
▪ HVRC25015: 5m @ 12.8g/t Au from 142m, including 1m @ 55.2g/t Au from 142m
o Bull Oak:
▪ BORC25006: 157m @ 1.13g/t Au from 18m, including 14m @ 1.10g/t from 40m, 6m
@ 3.86g/t from 117m and 3m @ 31.40g/t Au from 130m
▪ BORC25013: 73m @ 1.14g/t Au from 11m including 10m @ 5.83g/t Au from 11m,
including 1m @ 16.7g/t Au from 15m
▪ BORC25010: 45m @ 1.00g/t Au from 8m including 2m @ 5.44g/t Au from 8m, 2m
@ 7.80g/t Au from 16m, 9m @ 4.44g/t Au from 162m and 12m @ 2.01g/t Au from
231m
Laverton Hub 9, 10
o Second Fortune Regional Prospects:
Linden Giant Prospect:
▪ SFRC25012: 10m @ 9.83g/t Au from 57m, including 1m @ 56.9g/t Au from 62m
Linden Star Prospect
▪ SFRC25013: 7m @ 2.30g/t Au from 47m
▪ SFRC25014: 1m @ 13.7g/t Au from 54m
Alawa Prospect
▪ SFRC25020: 1m @ 53.8g/t Au from 83m
o Fish Mine – Stage 2 Underground drilling:
4
▪ FUDD002: 7.0m @ 3.31g/t Au from 141.6m and 9.9m @ 2.90g/t Au from 179.5m including
1.0m @ 10.2g/t Au from 183.0m
▪ FUDD008: 3.3m @ 3.34g/t Au from 191.7m and 6.3m @ 2.35g/t Au from 198.5m
▪ FUDD001A: 4.0m @ 3.48g/t Au from 176.0m and 3.2m @ 4.51g/t Au from 209.4m
▪ FUDD005: from 142m, including 1m @ 55.2
o Surface drilling:
▪ FHRC250001: 5m @ 2.64g/t Au from 120.0m
▪ FHRCD25005C: 4.0m @ 2.42g/t Au from 544.0m, including 1.0m @ 4.05g/t Au from 547m
Menzies Hub 11
o Yunndaga:
▪ YNRCD25040: 7.0m @ 5.70g/t Au from 230m, including 0.6m @ 54.8g/t Au from
234.8m
▪ YNDD25003: 10.6m @ 2.28g/t Au from 217m, including 1.1m @ 11.90g/t Au from
225.6m
▪ YNRCD25041: 4.0m @ 2.51g/t Au from 262m, including 1.0m @ 8.45g/t Au from
265m
5 OPERATIONS OVERVIEW Brightstar Resources Ltd (Brightstar or the Company) (ASX: BTR) is pleased to announce updates on its operational activities for the December 2025 quarter as outlined below. Production Summary
MarQ 2025 JunQ 2025 SepQ 2025 DecQ 2025
Unit Total Total Total Second Fortune Fish Lord Byron Total Mining operations
Development ore:
Ore mined kt 8.2 11.7 33.0
8.3 22.5 - 30.8
Grade mined g/t Au 2.53 2.79 3.01
3.37 1.87 - 2.27
Contained gold oz 667 1,047 3,192
895 1,351 - 2,246
Stope ore:
Ore mined kt 20.0 23.0 36.2
23.5 34.0 - 57.6
Grade mined g/t Au 3.63 3.54 3.27
2.47 3.41 - 3.03
Contained gold oz 2,334 2,619 3,810
1,872 3,728 - 5,600
Total ore mined:
Ore mined kt 28.2 34.7 69.2
31.8 56.5 - 88.3
Grade mined g/t Au 3.31 3.29 3.15
2.71 2.80 - 2.76
Contained gold oz 3,002 3,667 7,002
2,767 5,078 - 7,846
Metres advanced:
Operating m 406 469 783
361 316 - 677
Capital (drives) m 151 249 340
89 310 - 399
Capital (decline) m 140 531 368
130 174 - 304
Total metres m 697 1,249 1,491
580 800 - 1,380
FOURTH GOLD PROCESSING CAMPAIGN COMPLETED 12
During the December quarter, ore processing for the fourth campaign was completed at Genesis Minerals
Ltd’s (ASX:GMD) Laverton Mill.
A record total of ~83kt of ore was processed through the Laverton Mill, at a reconciled blended head grade
of 2.32g/t Au, which recovered 4,652oz Au at a 75% recovery which was a major variance to the previous
Parcel 3 campaign, which reconciled at 91.3%.
Brightstar, in consultation with its independent metallurgical advisors, has identified sub-optimal leaching
conditions during the processing campaign, which adversely impacted recoveries from the parcel.
Management is confident that recoveries can be improved in the upcoming campaign through targeted
adjustments to ore blending and processing parameters.
Accordingly, Brightstar’s fifth and final processing campaign through Genesis’ Laverton mill, scheduled for
late March, is expected to be a record campaign in terms of both ore processed and gold produced.
6 Sales Summary
MarQ 2025 JunQ 2025 SepQ 2025 DecQ 2025
Unit Total Total Total Second Fortune Fish Lord Byron Total Sales
Ore sales:
Ore sold kt 74.9 68.6 51.2 33.6
48.9 - 82.5
Grade g/t Au 2.19 2.08
2.34 2.89 2.60 - 2.72
Contained gold oz 5,268 4,587 3,857
3,121 4,079 - 7,200
Recovery
i
% 94% 92% 80%
83% 74% - 78%
Recovered gold
ii
oz 4,960 4,225 3,072
2,587 3,031 - 5,618
Inventory
Stockpiles (at Qtr end):
Ore kt 167.7 143.3
157.2 3.8 16.0 141.8 161.6
Grade g/t Au 0.97 0.93
1.13 2.48 2.69 0.90 1.12
Contained gold oz 5,219 4,272
5,713 307 1,380 4,119 5,805
i. Estimated recoveries between ore sources are reconciled based on historical processing records and test work.
ii. The September quarter is restated to allocate the adjustment relating to final physicals, revenue and processing costs realised during the December
quarter and relating to the September quarter following finalisation of the processing reconciliations in the December quarter.
Financial Summary
Unit Brightstar Group
Financial Summary
i
MarQ 2025 JunQ 2025 SepQ 2025 ii DecQ 2025 Sales:
Gold sales oz 4,960 4,225 3,072 5,618 Average price received A$/oz 4,745 5,151 5,860 6,247 Sales proceeds iii,iv $000 23,537 21,763 18,003 35,095 Cost summary:
Mining $000 (4,897) (6,029) (10,203) (9,726) Site services/G&A $000 (2,851) (1,972) (4,557) (5,124) Haulage and Processing iv $000 (10,564) (9,738) (8,220) (12,388) Cash operating costs $000 (18,312) (17,739) (22,979) (27,238) Royalties $000 (251) (835) (548) (807) Sustaining Capital $000 (1,503) (3,161) (1,604) (5,462) Mine operating cash flow/(deficit) v, vi
$000 3,471 28 (7,128) 1,588 Growth Capital (projects in production) $000 (2,660) (576) (568) (1,868) Net mine cash flow/(deficit) vi, vii $000 811 (548) (7,696) (280) Growth Capital (Fish Mine development) viii $000 (3,646) (11,366) (4,756) - Ore Inventory Adjustments $000 (6,764) ix (1,121) 3,431 4,538 Exploration and studies $000 (3,801) (5,791) (6,167) (7,142) Corporate $000 (2,013) (2,171) (2,791) (2,141) Total non-cash, growth & corporate costs $000 (16,244) (20,450) (10,284) (4,744)
7
Note: Mining costs for Fish in July and August ($2.2 million) have been included as operating costs despite being incurred prior to the
commencement of stoping production in late August.
i. Information in this Financial Summary is presented on an accrual basis.
ii. The September quarter is restated to allocate the adjustment relating to final physicals, revenue and processing costs realised during the December
quarter and relating to the September quarter production following finalisation of the processing reconciliations in the December quarter. The
September quarter is also restated to reclassify the split of costs between mining and capital in relation to mine development activities.
iii. Sales proceeds are derived from the OPA with Genesis Minerals Ltd and reflect reconciled production and received prices for all ore sold to Genesis up
to and including 15 November 2025 (which has been processed and reconciled) and provisional revenue and prices for all ore sold thereafter until the
end of the quarter.
iv. Sales proceeds are presented on a gross basis assuming all recoverable ounces delivered to Mt Morgans (both processed and unprocessed) are sold
before any adjustments are made for processing costs or other charges under the Genesis OPA. Processing charges are included on a gross basis within
haulage and processing costs. Direct haulage costs include haulage and road maintenance of unsealed roads from Second Fortune (~102km) and Jasper
Hills (~124km) to Genesis’ Laverton Mill.
v. Mine operating cash flow/(deficit) = Sales proceeds less cash operating costs, royalties and sustaining capital.
vi. Net mine cashflow for the June quarter negatively impacted by recovered gold from the low-grade Laverton stockpiles, which contributed a one-off direct
loss of $2.9 million for the June quarter. Haulage and processing of the stockpiles was necessary to deliver sufficient ore tonnes for minimal processing
campaign size and underdelivered to budget based on grade and recovery. Net mine cashflow for the September quarter is negatively impacted by the
lower recovery rates realised during the November processing campaign following the increased proportion of Pyrrhotite-bearing Fish ore in the blended
parcel, which is being addressed in the upcoming processing campaign.
vii. Net mine cash flow = Mine operating (cash flow) less growth capital (projects in production).
viii. Relates to Fish Mine capital including start-up costs, expenditure on plant and equipment and mine development activities. The Fish mine was not in
“commercial production” as defined in Accounting Standards during the September Quarter. Commercial production refers to a period where the mine
has operated as intended by management for a sustained period. This hurdle was reached during the December Quarter, upon which depreciation of
assets will commence over their respective useful lives.
ix. Elevated ore inventory adjustment for the March 2025 quarter relates to costs incurred in the Dec 2024 half which saw elevated capital investment at
Second Fortune ahead of the commencement of full production and ore sales.
Figure 1: Brightstar’s Project Hubs
8
MINING & DEVELOPMENT OPERATIONS OVERVIEW
SECOND FORTUNE UNDERGROUND MINE
Second Fortune mined a total of 31,815t @ 2.71 g/t Au for 2,767oz Au of contained gold was mined in
December quarter, comprised of:
o 8,271t @ 3.37 g/t Au of development ore, and
o 23,537t @ 2.47 g/t Au of stope ore.
Total development for the quarter was 580m, consisting of 130m of Decline, 89m of capital and 361m of
operating development.
Development ore for the quarter was won from the 995 and 975 levels, with the 995 level being completed
and stoping commenced.
In the June quarter, Brightstar discovered the ‘FTV Lode’ on the 1015 level as a potentially material extension
to the main Second Fortune ore body. Previously, mining at Second Fortune was constrained by the
"Northern Fault" which represented the lateral extent of the mineralisation to the north.
Development of the FTV lode continued on the 975 level and stoping of the FTV occurred on the 995 level in
the December quarter. Diamond drilling of the lower sections of the main orebody commenced in
December, with the drill targeting the FTV lodes downdip of the current levels.
Figure 2: Second Fortune underground mine
9
Stoping production was delayed due to the extension of the 995 ore drive along the FTV lode. The additional
advance of 60m put the strike of the FTV lode out to 90m, an increase in total strike of 260% from the 1015
level above.
A capital vent rise was completed ahead of ventilation upgrades to the lower section of the mine.
FISH UNDERGROUND MINE
Fish mined a total of 56,510t @ 2.79 g/t Au for 5,078oz Au of contained gold was mined in December
quarter, comprised of:
o 22,497t @ 1.87 g/t Au of development ore, and
o 34,013t @ 3.41 g/t Au of stope ore.
The December quarter achieved record production and an increase of 42% in ounces compared to the
September quarter.
Total development for the quarter was 800m, consisting of 174m of Decline, 310m of capital and 361m of
operating development. Capital development increased through the quarter as a number of Fish “Stage 2”
works were completed in preparation for continuing Decline development in Q1 2026. These capital works
included return airway development, and an additional portal into the Fish pit wall, for vent exhaust.
Ore drive development was completed on the 1325 and the 1300 levels which completed ore development
for Fish Stage 1.
Phase 1 of the diamond drill campaign was completed (~5,400m), and the diamond drill mobilised to Second
Fortune for December. The drilling targeted Fish Stage 2 resource definition and development with results
of the campaign discussed further in the report. Phase 2 of the diamond campaign (~4,000m) is scheduled
to occur in CYQ2 2026.
DEVELOPMENT STUDIES OVERVIEW
GOLDFIELDS DFS 2.0
2
The original Laverton-Menzies Definitive Feasibility Study, released in June 2025, highlighted the strong
economic case for recommencing mining operations at Brightstar’s Laverton and Menzies Gold Projects.
The Company’s focus during the December quarter has been centred on advancing the June 2025 DFS
further, with the study work now labelled as Goldfields DFS 2.0.
Increases in Mineral Resources precipitated open pit re-optimisation work on Cork Tree Well, Lord Byron
and Lady Shenton, followed by mine design, scheduling and costing.
The feasibility work for Brightstar’s Yunndaga mine, located in Menzies, continued, with the study
building on diamond drilling work completed in the quarter, which delineated metallurgical and
geotechnical parameters used for the economic model and mine designs.
The study was advanced to reserves for the open pits Cork Tree Well, Lord Byron and Lady Shenton,
along with the Yunndaga underground and final report writing, and subsequently DFS2.0 was released
to market on 29 January 2026
2
.
10
Figure 3: Goldfields DFS 2.0 production profile
Figure 4: Goldfields DFS 2.0 Free Cash Flow profile
5 75 78 79 77 76 67
20 40 60 80 100 2027202820292030203120322033 Gold (koz) Financial Year Group Production (koz) $977M (400) (200)
200 400 600 800 1,000 1,200 20262027202820292030203120322033 Cash flow (A$M) Financial Year Pre-tax Project FCF –Base Case (A$6,000/oz) Net revenueMining opexHaulage opex Processing opexG&A opexMining capex Plant & site establishment capexCum. Free cash flow (pre-tax) Assumes Base Case of A$6,000/oz. Net revenue net of royalties 3
11
SANDSTONE PRE-FEASIBILITY STUDY
Brightstar’s exploration and project development teams have made significant progress on the
Sandstone Gold Project since the acquisition of Alto Metals and the Montague East Gold Project, in late
2024.
The Company is advancing a PFS targeting completion in 1H CY26, with preliminary assessments
suggesting a 4.0 –5.0Mtpa processing plant located in Sandstone will likely optimise operational
and financial outputs.
The Sandstone PFS commenced in the September quarter, with the December quarter focussing on pit
optimisation work relating to the new Mineral Resources Estimates. A number of the open pits are in
various states of analysis, with multiple workstreams ongoing regarding metallurgical, geotechnical,
mining and scheduling.
Key PFS workstreams advancing include:
• metallurgical assessments to confirm gold recovery rates
• geotechnical assessments to confirm open pit stability and optimal pit wall angles to drive strip ratios;
• open pit mine optimisations to inform drilling program planning;
• capital infrastructure requirements;
• processing infrastructure design; and
• permitting and approvals activities to support the redevelopment of the Sandstone Gold Project
12 EXPLORATION ACTIVITIES OPERATIONS OVERVIEW
SANDSTONE DRILLING ACTIVITIES 8
During the June Quarter, Brightstar completed drilling campaigns at the Bull Oak and Havilah Deposits. The Sandstone Gold Project has a current Mineral Resource Estimate of 2.4Moz @ 1.5g/t Au.
Figure 5 Geology of Brightstar’s Sandstone Project showing deposit and prospect locations.
Bull Oak
The Bull Oak deposit hosts a current MRE of 90koz @ 1.1g/t Au, limited by sparse drilling below 100m depth.
Mineralisation is hosted by sheeted, shallowly east-dipping veins sets within a granodiorite intrusion, with
further mineralisation hosted by banded iron units (BIFs) truncated by the intrusion. This geological setting
is similar to that of Brightstar’s nearby Shillington-Two Mile Hill deposits (MRE of 0.7Moz @ 1.5g/t Au), recently
acquired via the acquisition of Aurumin Limited.
The current program aimed to test beneath the existing Mineral Resource, primarily targeting the
granodiorite-hosted vein lodes to assess continuity for potential future resource upgrades. A total 9 RC holes
were completed for ~2,100m of drilling. Several RC holes had issues with ground conditions and failed to
reach the target depth. Diamond drilling was found to be a much more reliable method for reaching target
depth, with the additional benefit of providing structural and geotechnical data, as well providing mass for
metallurgical test work.
A total of three diamond drillholes have been completed for 830m, with further drilling ongoing. Assays were
pending for all diamond holes at the end of the quarter.
13
In line with the geological model, the drilling intersected narrow zones of high-grade mineralisation related
to both granodiorite-hosted quartz veins, and the neighbouring BIF units.
Assay results for these zones include:
• 3m @ 31.40g/t Au from 130m in BORC25006 (BIF)
• 10m @ 5.83g/t Au from 11m, including 1m @ 16.7g/t Au from 15m in BORC25013 (BIF)
• 9m @ 4.44g/t Au from 162m, including 1m @ 29.9g/t Au from 162m in BORC25010 (Granodiorite)
• 12m @ 2.01g/t Au from 231m, including 1m @ 14.2g/t Au from 234m in BORC25010 (Granodiorite)
• 6m @ 3.86g/t Au from 117m, including 1m @ 12.5g/t Au from 118m in BORC25006 (BIF)
The high-grade intervals were typically present within wide haloes of lower grade material. Significant
intercepts for these wide zones include:
• 157m @ 1.13g/t Au from 18m in BORC25006
• 168m @ 0.40g/t Au from 32m in BORC25012
• 73m @ 1.14g/t Au from 11m in BORC25014
• 45m @ 1.00g/t Au from 8m in BORC25010
Drilling is ongoing at Bull Oak targeting infill of the area beneath the existing MRE, in order to delineate the
mineralised lodes and facilitate a Mineral Resource update incorporating these extensions.
Figure 6: Location map for the Bull Oak RC and Diamond Drill Collars
14 Havilah A total of 34,000oz at 22g/t Au was produced at the Havilah camp from 1907-1911, predominantly from steeply dipping quartz veins up to 120m deep. The bulk of the mineralisation is hosted within a dolerite sill, on or close to the contact with an ultramafic unit. The latest phase of drilling at Havilah targeted down-dip and down-plunge extensions to the known high- grade mineralisation. A total of 17 RC holes were drilled for ~3,200m. In addition, two short diamond holes were drilled (220m total), primarily for structural, geotechnical and metallurgical purposes. The drilling intersected quartz breccia veins with 2-5% pyrite, within the host dolerite and ultramafic lithology units. Significant intercepts from the drilling include: • 5m @ 12.8g/t Au from 142m in HVRC25015 • 3m @ 1.39g/t Au from 172m in HVRC25028 • 1m @ 3.47g/t Au from 126m in HVRC25027
Figure 7: Location map for the Havilah RC and Diamond Drill Collars
15
Figure 8: Cross Section looking west of drillhole HVRC25015, close to the Maninga Marley historic workings at the Havilah
camp.
LAVERTON DRILLING
9, 10
Second Fortune Mine & Regional Targets A total of 29 RC holes for ~4,800m were drilled at the Second Fortune Mine and several regional prospects, with all assays now returned. Significant RC results from the drilling program included: • 10m @ 9.83g/t Au from 57m, including 1m @ 56.9g/t Au from 62m in SFRC25012 (Linden Giant) • 7m @ 2.30g/t Au from 47m in SFRC25013 (Linden Star) • 4m @ 2.53g/t Au from 102m in SFRC25018 (May Prince) • 1m @ 53.8g/t Au from 83m in SFRC25020 (Alawa) • 1m @ 13.7g/t Au from 54m in SFRC25014 (Linden Star) RC drilling at Linden Giant prospect targeted the southern continuation of north-south oriented mineralisation intersected in historical drilling. Mineralisation appears to be associated with an interpreted sub-vertical, north-south oriented structure evident in magnetic imagery and is analogous to mineralisation at the Second Fortune Mine.
16
Significant results reported at Linden Giant include 10m @ 9.83g/t Au from 57m, including 1m @ 56.9g/t Au
from 62m in SFRC25012. Insufficient drilling has been completed to determine the orientation of this wide,
high-grade intercept and further RC drilling is warranted.
At the Alawa prospect, RC drilling was designed to follow up significant historical drillhole intercepts,
intersecting a narrow, steeply west-dipping, high-grade vein hosted within a sediment unit close to an
ultramafic contact. Significant results were reported at Alawa, including 1m @ 53.8g/t Au from 83m in
SFRC25020. Importantly, this drill hole is at the northern end of the current extent of drilling and
mineralisation has now been defined over 200m strike length and is open along strike at depth. Further
drilling is planned to follow up this shallow, high-grade mineralisation.
Seven RC holes were drilled at the northern end of the Second Fortune Mine, targeting a near-surface
expression of the recently discovered ‘FTV’ lode. Significant results included 1m @ 3.33g/t Au from 185m in
SFRC25002.
Figure 9: Location map for the Second Fortune RC Drill Collars
17
Fish Deposit – Surface Drilling
The surface exploration drilling program has been completed at Fish, with eight holes drilled, totalling
~2,700m. Five holes consisted of an RC pre-collar holes with a diamond tail, with three RC-only holes.
The extensional program predominantly targeted the extents of the orebody at depth and along strike to
the south. Three RC-only holes were drilled targeting the upper zones of the deposit, including southern
extensions to the ore drives. This has enabled underground development to be extended to these areas
which were previously proposed to be outside the mine plan.
Significant RC results from the drilling program included:
• 5m @ 2.64g/t Au from 120m in FHRC25001
• 4.0m @ 2.42g/t Au from 544.0m, including 1.0m @ 4.05g/t Au from 547.0m in FHRCD25005C
• 2m @ 3.65g/t Au from 144m in FHRC25002
Three of the drillholes were selected for a downhole electromagnetic (DHEM) survey, targeting an indication
of further mineralisation at depth. The sulphide-rich (pyrrhotite-pyrite) mineralisation at Fish, within an
amphibolite host, is ideally suited to this technique and several conductor plates were identified.
The holes predominantly targeted a large untested zone at depth with significant conductor plates
defined in this area. Additional plates were also detected higher up the mine when in proximity to the
surveyed drillholes, in areas where known high-grade gold mineralisation exists, validating DHEM as an
effective targeting tool.
Figure 10: Plan view of the Fish deposit surface RC and DD collars
18
Fish Deposit (Underground Diamond Drilling)
Underground drilling was designed to target infill and extensional holes to Brightstar’s ‘Stage 2’ conceptual
mine plan, which sits below the current Ore Reserve and current mine plan. The drilling program, to be
completed in two phases, includes a substantial drill-out of deeper mineralisation targeting the conversion
of Inferred Mineral Resources beneath the existing mine plan into Measured/Indicated classification to
enable the delineation of Ore Reserves and inclusion in future mine plan extensions.
The ongoing Phase 1 program totals ~5,400m and targets the infill and strike extensions to the central
portions of the conceptual ‘Stage 2’ mine design, with a further ~4,000m of drilling (Phase 2) focused on
Mineral Resource extensions at depth and potential parallel lodes to the main zone.
The drilling program intersected significant mineralisation in the targeted main zone, and also within parallel
hangingwall and footwall zones. This is different to the current mining area in Stage 1, where little
mineralisation exists outside of the main zone. Assay results included:
• 7.0m @ 3.31g/t Au from 141.6m in FUDD002 (Main Zone)
• 6.3m @ 2.35g/t Au from 198.5m in FUDD008 (Main Zone)
• 3.2m @ 4.51g/t Au from 209.4m in FUDD001A (Hangingwall Zone)
• 9.9m @ 2.90g/t Au from 179.5m in FUDD002 (Hangingwall Zone)
• 1.1m @ 17.6g/t Au from 145.6m in FUDD005 (Footwall Zone)
Figure 11: Long Section of the Fish deposit (Main Zone) showing results from the recent drilling program (Underground and surface) in relation to existing results and the DHEM conductor plates
19 The delineation of multiple potential parallel lodes at depth presents a near-term opportunity for Brightstar to evaluate a scenario of mining multiple lodes at Fish utilising existing sunk capital across underground infrastructure and the established support infrastructure on site.
Brightstar is expediting workstreams in relation to this opportunity targeting resource and mine plan upgrades at Fish to potentially serve as an additional high grade ore source for the planned Brightstar Laverton mill.
Figure 12 - Plan view of the Lord Byron South RC Drill collars, in relation to existing drilling and planned mine infrastructure
MENZIES DRILLING 11
Yunndaga The Yunndaga mine historically produced over 270koz of gold at an average grade of +16g/t Au, mostly from the Princess Eva and Princess May underground workings. Additional production was derived from later open pit mining (Paddington Gold, 1995-1998) with approximately 64koz of gold produced at a grade of 2.5g/t Au. The current Mineral Resource Estimate (MRE) at Yunndaga extends to approximately 240m vertical depth with limited drill testing below this. This RC and diamond drilling program followed on from the successful Phase 1 program reported in May and aimed to infill the resource in areas optimised for underground mining, stepping out from the initial intercepts and testing for extensions at depth and to the north.
20
A total of 31 drill holes for ~6,600m were drilled at the Yunndaga deposit in Phase 2. The drilling comprised
17 RC holes, 10 RC holes with diamond core tails, and four diamond core holes drilled from surface. The
diamond core component of the program, totalling ~1,600m, also provided important geotechnical data and
metallurgical sample material to help progress the development workstreams at the deposit.
Assays for the RC component of the drilling program were reported on 4
th
September 2025.
Significant results were received including:
• 7m @ 5.70g/t Au from 230m in YNRCD25040, including 0.6m @ 54.8g/t Au from 234.8m
• 10.6m @ 2.28g/t Au from 217m in YNDD25003, including 1.1m @ 11.9g/t Au from 225.6m
Grade and thickness variability is typical for the Menzies deposits with a nuggety grade distribution
commonly observed. The mineralised lodes dip approximately 55° to the southwest resulting in typical true
thicknesses of 85-95% of the downhole intercept width. The exception to this is YNDD25003 which was drilled
at a more oblique angle to increase the mineralised material produced for ongoing metallurgical work. One
hole (YNDD25004) was drilled for purely geotechnical purposes, into an area of proposed underground mine
development.
Additional significant DD results from the current drilling program included:
• 8.50m @ 1.95g/t Au from 251m in YNRCD25042, including 1m @ 8.39g/t Au from 257.5m
• 4m @ 2.51g/t Au from 262m in YNRCD25041, including 1m @ 8.45g/t Au from 265m and 1m @
11.4g/t Au from 274m
• 1.45m @ 6.07g/t Au from 251.8m in YNDD25001, including 0.3m @ 13.7g/t Au from 252.65m
The drilling intersected visible gold in multiple diamond drill holes within quartz veins hosted in zones of
strongly silica-sericite altered sediments, on the contact of a mafic amphibolite unit. The altered zone was
associated with significant sulphide mineralisation.
Figure 13: Examples of visible gold in Yunndaga drill core from the ongoing diamond drilling program.
21 Table 1: Details for drill hole reporting visible gold Hole ID Hole Type From (m) To (m) Lithology Mineralisation and assay results YNRCD25040 RCDT 235 235.1 Quartz veining within strongly silica- sericite altered sediment on the
Prompts
Click prompts to add them under the company line, click again to take one out, then copy the result into your AI chat. Shared by Asian Century Stocks and Uncovered Thai Stocks. Thank you.
ETFs Holding Brightstar Resources Limited
Exchange-traded funds whose newest published daily portfolio holds one of the company's listings, largest weight first.